EX-13.1 2 trp-06302021xmda.htm MANAGEMENT'S DISCUSSION AND ANALYSIS Document
EXHIBIT 13.1
Quarterly report to shareholders
Second quarter 2021
Financial highlights
three months ended
June 30
six months ended
June 30
(millions of $, except per share amounts)2021202020212020
Income    
Revenues3,182 3,089 6,563 6,507 
Net income/(loss) attributable to common shares982 1,281 (75)2,429 
per common share – basic $1.00 $1.36 ($0.08)$2.59 
Comparable EBITDA2,246 2,199 4,738 4,734 
Comparable earnings1,045 863 2,153 1,972 
per common share$1.07 $0.92 $2.23 $2.10 
Cash flows    
Net cash provided by operations1,711 1,613 3,377 3,336 
Comparable funds generated from operations1,754 1,549 3,777 3,643 
Capital spending1
1,439 2,150 3,324 4,419 
Dividends declared  
Per common share$0.87 $0.81 $1.74 $1.62 
Basic common shares outstanding (millions)   
– weighted average for the period 979 940 966 940 
– issued and outstanding at end of period979 940 979 940 
1Includes capacity capital expenditures, maintenance capital expenditures, capital projects in development and contributions to equity investments.






Management’s discussion and analysis
July 28, 2021
This management’s discussion and analysis (MD&A) contains information to help the reader make investment decisions about TC Energy Corporation (TC Energy). It discusses our business, operations, financial position, risks and other factors for the three and six months ended June 30, 2021, and should be read with the accompanying unaudited Condensed consolidated financial statements for the three and six months ended June 30, 2021, which have been prepared in accordance with U.S. GAAP.
This MD&A should also be read in conjunction with our December 31, 2020 audited Consolidated financial statements and notes and the MD&A in our 2020 Annual Report. Capitalized abbreviated terms that are used but not otherwise defined herein are defined in our 2020 Annual Report. Certain comparative figures have been adjusted to reflect the current period's presentation.
FORWARD-LOOKING INFORMATION
We disclose forward-looking information to help the reader understand management’s assessment of our future plans and financial outlook, and our future prospects overall.
Statements that are forward-looking are based on certain assumptions and on what we know and expect today and generally include words like anticipate, expect, believe, may, will, should, estimate or other similar words.
Forward-looking statements in this MD&A include information about the following, among other things:
our financial and operational performance, including the performance of our subsidiaries
expectations about strategies and goals for growth and expansion
expected cash flows and future financing options available, including portfolio management
expected dividend growth
expected access to and cost of capital
expected costs and schedules for planned projects, including projects under construction and in development
expected capital expenditures, contractual obligations, commitments and contingent liabilities
expected regulatory processes and outcomes
expected outcomes with respect to legal proceedings, including arbitration and insurance claims
the expected impact of future tax and accounting changes
expected industry, market and economic conditions
the expected impacts of COVID-19.
Forward-looking statements do not guarantee future performance. Actual events and results could be significantly different because of assumptions, risks or uncertainties related to our business or events that happen after the date of this MD&A.
2 | TC Energy Second Quarter 2021



Our forward-looking information is based on the following key assumptions, and subject to the following risks and uncertainties:
Assumptions
regulatory decisions and outcomes
planned and unplanned outages and the use of our pipeline, power and storage assets
integrity and reliability of our assets
anticipated construction costs, schedules and completion dates
access to capital markets, including portfolio management
expected industry, market and economic conditions
inflation rates and commodity prices
interest, tax and foreign exchange rates
nature and scope of hedging
expected impact of COVID-19.
Risks and uncertainties
our ability to successfully implement our strategic priorities and whether they will yield the expected benefits
our ability to implement a capital allocation strategy aligned with maximizing shareholder value
the operating performance of our pipeline, power and storage assets
amount of capacity sold and rates achieved in our pipeline businesses
the amount of capacity payments and revenues from our power generation assets due to plant availability
production levels within supply basins
construction and completion of capital projects
cost and availability of labour, equipment and materials
the availability and market prices of commodities
access to capital markets on competitive terms
interest, tax and foreign exchange rates
performance and credit risk of our counterparties
regulatory decisions and outcomes of legal proceedings, including arbitration and insurance claims
our ability to effectively anticipate and assess changes to government policies and regulations, including those related to the environment and COVID-19
our ability to realize the value of tangible assets and contractual recoveries from impaired assets, including the Keystone XL pipeline project
competition in the businesses in which we operate
unexpected or unusual weather
acts of civil disobedience
cyber security and technological developments
economic conditions in North America as well as globally
global health crises, such as pandemics and epidemics, including COVID-19 and the unexpected impacts related thereto.
You can read more about these factors and others in this MD&A and in other reports we have filed with Canadian securities regulators and the SEC, including the MD&A in our 2020 Annual Report.
As actual results could vary significantly from the forward-looking information, you should not put undue reliance on forward-looking information and should not use future-oriented information or financial outlooks for anything other than their intended purpose. We do not update our forward-looking statements due to new information or future events, unless we are required to by law.
TC Energy Second Quarter 2021 | 3



FOR MORE INFORMATION
You can find more information about TC Energy in our Annual Information Form (AIF) and other disclosure documents, which are available on SEDAR (www.sedar.com).
NON-GAAP MEASURES
This MD&A references the following non-GAAP measures:
comparable EBITDA
comparable EBIT
comparable earnings
comparable earnings per common share
funds generated from operations
comparable funds generated from operations.
These measures do not have any standardized meaning as prescribed by GAAP and therefore may not be comparable to similar measures presented by other entities.
Comparable measures
We calculate comparable measures by adjusting certain GAAP measures for specific items we believe are significant but not reflective of our underlying operations in the period. Except as otherwise described herein, these comparable measures are calculated on a consistent basis from period to period and are adjusted for specific items in each period, as applicable.
Our decision not to adjust for a specific item is subjective and made after careful consideration. Specific items may include:
gains or losses on sales of assets or assets held for sale
income tax refunds, valuation allowances and adjustments resulting from changes in legislation and enacted tax rates
certain fair value adjustments relating to risk management activities
legal, contractual and bankruptcy settlements
impairment of goodwill, plant, property and equipment, investments and other assets
acquisition and integration costs
restructuring costs.
We exclude the unrealized gains and losses from changes in the fair value of derivatives used to reduce our exposure to certain financial and commodity price risks. These derivatives generally provide effective economic hedges but do not meet the criteria for hedge accounting. As a result, the changes in fair value are recorded in net income. As these amounts do not accurately reflect the gains and losses that will be realized at settlement, we do not consider them reflective of our underlying operations. We also exclude the unrealized foreign exchange gains and losses on the Loan receivable from affiliate as well as the corresponding proportionate share of Sur de Texas foreign exchange gains and losses, as these amounts do not accurately reflect the gains and losses that will be realized at settlement. These amounts offset within each reporting period, resulting in no impact on net income.
The following table identifies our non-GAAP measures against their most directly comparable GAAP measures.
Comparable measureGAAP measure
comparable EBITDAsegmented earnings
comparable EBITsegmented earnings
comparable earningsnet income attributable to common shares
comparable earnings per common sharenet income per common share
comparable funds generated from operationsnet cash provided by operations
4 | TC Energy Second Quarter 2021



Comparable EBITDA and comparable EBIT
Comparable EBITDA (comparable earnings before interest, taxes, depreciation and amortization) represents segmented earnings adjusted for certain specific items, excluding non-cash charges for depreciation and amortization. We use comparable EBITDA as a measure of our earnings from ongoing operations as it is a useful indicator of our performance and is also presented on a consolidated basis. Comparable EBIT (comparable earnings before interest and taxes) represents segmented earnings adjusted for specific items and is an effective tool for evaluating trends in each segment. Refer to each business segment section for a reconciliation to segmented earnings.
Comparable earnings and comparable earnings per common share
Comparable earnings represents earnings or losses attributable to common shareholders on a consolidated basis, adjusted for specific items. Comparable earnings is comprised of segmented earnings, Interest expense, Allowance for funds used during construction (AFUDC), Interest income and other, Income tax expense, Non-controlling interests and Preferred share dividends, adjusted for specific items. Refer to the Consolidated results section for reconciliations to Net income attributable to common shares and Net income per common share.
Funds generated from operations and comparable funds generated from operations
Funds generated from operations reflects net cash provided by operations before changes in operating working capital. We believe it is a useful measure of our consolidated operating cash flows because it excludes fluctuations from working capital balances, which do not necessarily reflect underlying operations in the same period, and is used to provide a consistent measure of the cash generating performance of our assets. Comparable funds generated from operations is adjusted for the cash impact of specific items noted above. Refer to the Financial condition section for a reconciliation to Net cash provided by operations.
TC Energy Second Quarter 2021 | 5



Capital program
We are developing quality projects under our capital program. These long-life infrastructure assets are supported by long-term commercial arrangements with creditworthy counterparties and/or regulated business models and are expected to generate significant growth in earnings and cash flows.
Our capital program consists of approximately $21 billion of secured projects which include commercially supported, committed projects that are either under construction or are in or preparing to commence the permitting stage. An additional $7 billion of projects under development are commercially supported (except where noted) but have greater uncertainty with respect to timing and estimated project costs and are subject to certain key approvals.
Three years of maintenance capital expenditures for our businesses are included in the secured projects table. Maintenance capital expenditures on our regulated Canadian and U.S. natural gas pipelines are added to rate base on which we have the opportunity to earn a return and recover these expenditures through current or future tolls, which is similar to our capacity capital projects on these pipelines. Tolling arrangements in our liquids pipelines business provide for the recovery of maintenance capital expenditures.
In the six months ended June 30, 2021, we placed approximately $0.5 billion of Canadian and U.S. Natural Gas Pipelines capacity capital projects into service. In addition, approximately $0.8 billion of maintenance capital expenditures were incurred.
All projects are subject to cost and timing adjustments due to factors including weather, market conditions, route refinement, permitting conditions, scheduling and timing of regulatory permits, as well as the additional restrictions and uncertainty presented by the ongoing impact of COVID-19. Amounts exclude capitalized interest and AFUDC.
6 | TC Energy Second Quarter 2021



Secured projects
Expected
in-service date
Estimated
project cost1
Carrying value at June 30, 2021
(billions of $)
Canadian Natural Gas Pipelines
Canadian Mainline2021-20240.3 0.1 
NGTL System2
20211.2 0.8 
20223.2 1.0 
20231.7 0.1 
2024+0.5 — 
Coastal GasLink3
20230.2 0.2 
Regulated maintenance capital expenditures2021-20232.1 0.2 
U.S. Natural Gas Pipelines
Other capacity capital2021-2025US 2.8 US 1.0 
Regulated maintenance capital expenditures2021-2023US 2.1 US 0.3 
Mexico Natural Gas Pipelines
Villa de Reyes2021-2022US 0.9 US 0.8 
Tula4
— US 0.8 US 0.6 
Liquids Pipelines
Other capacity capital2022US 0.1 — 
Recoverable maintenance capital expenditures2021-20230.1 — 
Power and Storage
Bruce Power – life extension5
2021-20242.6 1.5 
Other
Non-recoverable maintenance capital expenditures6
2021-20230.7 0.1 
19.3 6.7 
Foreign exchange impact on secured projects7
1.6 0.6 
Total secured projects (Cdn$)
20.9 7.3 
1Amounts reflect 100 per cent of costs related to wholly-owned assets as well as cash contributions to our joint venture investments.
2Estimated project costs for 2022 and 2023 include $0.5 billion for the Foothills pipeline system related to the 2023 West Path Expansion Program.
3The estimated project cost and carrying value represent our share of partner equity contributions to the project, with the expected in-service date and estimated project cost reflecting the last project update. Refer to the Recent developments – Canadian Natural Gas Pipelines section for additional information regarding the ongoing review of project cost and schedule.
4Construction of the central segment of the Tula project has been delayed due to a lack of progress to successfully complete Indigenous consultation by the Secretary of Energy. Project completion is expected approximately two years after the consultation process is successfully concluded. The East Section of the Tula pipeline is available for interruptible transportation services.
5Reflects our expected share of cash contributions for the Unit 6 MCR program costs, expected to be in service in 2023, and amounts to be invested under the Asset Management program through 2024.
6Includes non-recoverable maintenance capital expenditures from all segments and is primarily comprised of our proportionate share of maintenance capital expenditures for Bruce Power and other Power and Storage assets.
7Reflects U.S./Canada foreign exchange rate of 1.24 at June 30, 2021.

TC Energy Second Quarter 2021 | 7



Projects under development
The costs provided in the table below reflect the most recent estimates for each project as filed with the various regulatory authorities or otherwise determined by management.
Estimated
project cost1
Carrying value at June 30, 2021
(billions of $)
U.S. Natural Gas Pipelines
Other capacity capital2
US 0.3 — 
Liquids Pipelines
Grand Rapids Phase 23
0.7 — 
Power and Storage
Bruce Power – life extension4
5.9 0.3 
6.9 0.3 
Foreign exchange impact on projects under development5
0.1 — 
Total projects under development (Cdn$)
7.0 0.3 
1Amounts reflect our proportionate share of joint venture costs where applicable and 100 per cent of costs related to wholly-owned assets.
2Includes projects subject to a positive customer FID.
3Regulatory approvals have been obtained and additional commercial support is being pursued.
4Reflects our proportionate share of MCR program costs for Units 3, 4, 5, 7 and 8, and the remaining Asset Management program costs beyond 2024.
5Reflects U.S./Canada foreign exchange rate of 1.24 at June 30, 2021.
8 | TC Energy Second Quarter 2021



Consolidated results – second quarter 2021
three months ended
June 30
six months ended
June 30
(millions of $, except per share amounts)2021202020212020
Canadian Natural Gas Pipelines361 682 717 973 
U.S. Natural Gas Pipelines688 625 1,561 1,463 
Mexico Natural Gas Pipelines138 151 290 390 
Liquids Pipelines250 306 (2,258)717 
Power and Storage158 (31)321 33 
Corporate(36)(20)(4)281 
Total segmented earnings1,559 1,713 627 3,857 
Interest expense(583)(561)(1,153)(1,139)
Allowance for funds used during construction64 81 114 163 
Interest income and other127 203 189 (324)
Income/(loss) before income taxes1,167 1,436 (223)2,557 
Income tax (expense)/recovery(147)(52)293 112 
Net income1,020 1,384 70 2,669 
Net income attributable to non-controlling interests(6)(63)(75)(159)
Net income/(loss) attributable to controlling interests1,014 1,321 (5)2,510 
Preferred share dividends(32)(40)(70)(81)
Net income/(loss) attributable to common shares982 1,281 (75)2,429 
Net income/(loss) per common share – basic$1.00 $1.36 ($0.08)$2.59 
Net income/(loss) attributable to common shares decreased by $299 million and $2.5 billion or $0.36 and $2.67 per common share for the three and six months ended June 30, 2021 compared to the same periods in 2020. This decrease was primarily due to the $2.2 billion after-tax asset impairment of the Keystone XL pipeline project, net of expected contractual recoveries and other contractual and legal obligations, recorded through the income statement and also reflects the impact of common shares issued for the acquisition of the remaining ownership interests in TC PipeLines, LP in first quarter 2021.
The following specific items were recognized in Net income/(loss) attributable to common shares and were excluded from comparable earnings:
2021 results included:
a $2.2 billion after-tax asset impairment charge predominantly in first quarter 2021, net of expected contractual recoveries and other contractual and legal obligations, related to the termination of the Keystone XL pipeline project following the January 20, 2021 revocation of the Presidential Permit. Refer to the Recent developments section for additional information
preservation and other costs of $16 million after tax in second quarter 2021 primarily related to the preservation and storage of Keystone XL pipeline project assets which could not be accrued as part of the Keystone XL impairment charge, and interest expense on the Keystone XL project-level credit facility prior to its termination
a $13 million after-tax recovery of certain costs from the IESO in second quarter 2021 associated with the Ontario natural gas-fired power plants sold in 2020.
The Keystone XL pipeline project asset impairment charge does not reflect offsetting amounts with respect to the Government of Alberta's related investment in Keystone XL nor their repayment of the project's guaranteed credit facility without recourse to TC Energy, both of which were accounted for within the Condensed consolidated statement of equity in second quarter 2021 and served to reduce our net financial impact from the Keystone XL pipeline project termination. Refer to the Recent developments – Liquids Pipelines section for additional information.
TC Energy Second Quarter 2021 | 9



2020 results included:
an after-tax gain of $408 million related to the sale of a 65 per cent equity interest in the Coastal GasLink Pipeline Limited Partnership (Coastal GasLink LP) in second quarter 2020
an income tax valuation allowance release of $281 million following our reassessment of deferred income tax assets that are deemed more likely than not to be realized in first quarter 2020
an incremental after-tax loss of $80 million in second quarter 2020 related to the Ontario natural-gas fired power plants sold in April 2020, which resulted in a year-to-date after-tax loss of $157 million at June 30, 2020.
Net income/(loss) in both periods included unrealized gains and losses from changes in risk management activities which we exclude, along with the above noted items, to arrive at comparable earnings. A reconciliation of Net income/(loss) attributable to common shares to comparable earnings is shown in the following table.
RECONCILIATION OF NET INCOME/(LOSS) TO COMPARABLE EARNINGS
three months ended
June 30
six months ended
June 30
(millions of $, except per share amounts)2021202020212020
Net income/(loss) attributable to common shares982 1,281 (75)2,429 
Specific items (net of tax):
Keystone XL asset impairment charge and other2 — 2,194 — 
Keystone XL preservation and other16 — 16 — 
Gain on partial sale of Coastal GasLink LP (408) (408)
Income tax valuation allowance release —  (281)
(Gain)/loss on sale of Ontario natural gas-fired power plants(13)80 (13)157 
Risk management activities1
58 (90)31 75 
Comparable earnings1,045 863 2,153 1,972 
Net income/(loss) per common share $1.00 $1.36 ($0.08)$2.59 
Specific items (net of tax):
Keystone XL asset impairment charge and other — 2.27 — 
Keystone XL preservation and other 0.02 — 0.02 — 
Gain on partial sale of Coastal GasLink LP (0.43) (0.43)
Income tax valuation allowance release —  (0.30)
(Gain)/loss on sale of Ontario natural gas-fired power plants(0.01)0.09 (0.01)0.17 
Risk management activities0.06 (0.10)0.03 0.07 
Comparable earnings per common share$1.07 $0.92 $2.23 $2.10 
1Risk management activitiesthree months ended
June 30
six months ended
June 30
(millions of $)2021202020212020
 U.S. Natural Gas marketing(4)— 2 — 
Liquids marketing(14)(41)10 
Canadian Power1 (2)1 (1)
 Natural Gas Storage2 (7)3 (4)
 Foreign exchange(63)170 (58)(102)
 Income tax attributable to risk management activities20 (30)11 25 
 Total unrealized (losses)/gains from risk management activities(58)90 (31)(75)
10 | TC Energy Second Quarter 2021



COMPARABLE EBITDA TO COMPARABLE EARNINGS
Comparable EBITDA represents segmented earnings adjusted for the specific items described above and excludes non-cash charges for depreciation and amortization. For further information on our reconciliation to comparable EBITDA refer to the business segment financial results sections.
three months ended
June 30
six months ended
June 30
(millions of $, except per share amounts)2021202020212020
Comparable EBITDA
Canadian Natural Gas Pipelines684 621 1,370 1,218 
U.S. Natural Gas Pipelines879 824 1,934 1,856 
Mexico Natural Gas Pipelines164 181 344 450 
Liquids Pipelines366 432 759 877 
Power and Storage157 135 338 329 
Corporate(4)(7)
Comparable EBITDA2,246 2,199 4,738 4,734 
Depreciation and amortization(633)(635)(1,278)(1,265)
Interest expense included in comparable earnings(577)(561)(1,147)(1,139)
Allowance for funds used during construction64 81 114 163 
Interest income and other included in comparable earnings158 250 55 
Income tax expense included in comparable earnings(175)(125)(379)(336)
Net income attributable to non-controlling interests (6)(63)(75)(159)
Preferred share dividends(32)(40)(70)(81)
Comparable earnings1,045 863 2,153 1,972 
Comparable earnings per common share$1.07 0.92 $2.23 $2.10 
Comparable EBITDA – 2021 versus 2020
Comparable EBITDA increased by $47 million for the three months ended June 30, 2021 compared to the same period in 2020 primarily due to the net effect of the following:
higher EBITDA from Canadian Natural Gas Pipelines largely due to the impact of increased flow-through income taxes and depreciation along with higher rate-base earnings on the NGTL System and Coastal GasLink development fees
increased earnings in U.S. Natural Gas Pipelines from Columbia Gas following the application for higher transportation rates effective February 1, 2021, subject to refund upon completion of the current rate proceeding, as well as improved earnings across our U.S. Natural Gas Pipelines assets following the cold weather events of 2021 impacting many of the U.S. markets in which we operate
higher Power and Storage results attributable to increased earnings at Bruce Power in 2021 due to fewer outage days and a higher contract price, partially offset by higher operating expenses, as well as increased Natural Gas Storage and Other earnings following the November 2020 acquisition of the remaining 50 per cent ownership interest in TC Turbines
decreased earnings from Liquids Pipelines due to lower volumes on the Keystone Pipeline System, partially offset by increased contributions from liquids marketing activities reflecting higher margins and volumes
foreign exchange impact of a weaker U.S. dollar on the Canadian dollar equivalent segmented earnings in our U.S. dollar-denominated operations. As detailed below, U.S. dollar-denominated comparable EBITDA increased by US$105 million compared to 2020 to US$1.1 billion, however, this was translated at 1.23 in 2021 versus 1.39 in 2020. Refer to the Foreign exchange discussion below for additional information.
TC Energy Second Quarter 2021 | 11



Comparable EBITDA increased by $4 million for the six months ended June 30, 2021 compared to the same period in 2020 primarily due to the net effect of the following:
higher EBITDA from Canadian Natural Gas Pipelines largely due to the impact of increased flow-through depreciation along with higher rate-base earnings on the NGTL System, Coastal GasLink development fees and increased flow-through income taxes on the Canadian Mainline, partially offset by lower flow-through financial charges on the Canadian Mainline
increased earnings in U.S. Natural Gas Pipelines from Columbia Gas following the application for higher transportation rates effective February 1, 2021, subject to refund upon completion of the current rate proceeding, and improved earnings across our U.S. Natural Gas Pipelines assets following the cold weather events of 2021 impacting many of the U.S. markets in which we operate
higher Power and Storage results attributable to increased Natural Gas Storage and Other earnings following the November 2020 acquisition of the remaining 50 per cent ownership interest in TC Turbines, partially offset by decreased earnings in Bruce Power in 2021 primarily due to higher operating expenses and lower volumes. Canadian Power earnings are consistent, reflecting higher realized margins in 2021 and increased earnings from our MacKay River cogeneration facility, offset by the effect of the sale of our Ontario natural gas-fired power plants in April 2020
decreased earnings from Liquids Pipelines due to lower volumes on the Keystone Pipeline System, partially offset by increased contributions from liquids marketing activities reflecting higher margins and volumes
lower contribution from Mexico Natural Gas Pipelines mainly due to US$55 million of fees recognized in 2020 associated with the successful completion of the Sur de Texas pipeline
foreign exchange impact of a weaker U.S. dollar on the Canadian dollar equivalent segmented earnings in our U.S. dollar-denominated operations. As detailed below, U.S. dollar-denominated comparable EBITDA increased by US$81 million compared to 2020 to US$2.3 billion, however, this was translated at 1.25 in 2021 versus 1.37 in 2020.
While the weakening of the U.S. dollar in 2021 compared to the same periods in 2020 had a considerable negative impact on 2021 comparable EBITDA, the corresponding impact on comparable earnings was not significant due to offsetting natural and economic hedges. Refer to the Foreign exchange discussion below for additional information.
Due to the flow-through treatment of certain expenses including income taxes, financial charges and depreciation on our Canadian rate-regulated pipelines, changes in these expenses impact our comparable EBITDA despite having no significant effect on net income.
Comparable earnings – 2021 versus 2020
Comparable earnings increased by $182 million or $0.15 per common share for the three months ended June 30, 2021 compared to the same period in 2020 and was primarily the net effect of:
changes in comparable EBITDA described above
higher Interest income and other mainly attributable to realized gains in 2021 compared to realized losses in 2020 on derivatives used to manage our net exposure to foreign exchange rate fluctuations on U.S. dollar-denominated income
decreased Non-controlling interests following the March 3, 2021 acquisition of all outstanding common units of TC PipeLines, LP not beneficially owned by TC Energy
higher Income tax expense primarily due to higher comparable earnings and flow-through income taxes in our Canadian rate-regulated pipelines.
12 | TC Energy Second Quarter 2021



Comparable earnings increased by $181 million or $0.13 per common share for the six months ended June 30, 2021 compared to the same period in 2020 and was primarily the net effect of:
changes in comparable EBITDA described above
higher Interest income and other mainly attributable to realized gains in 2021 compared to realized losses in 2020 on derivatives used to manage our net exposure to foreign exchange rate fluctuations on U.S. dollar-denominated income
decreased Non-controlling interests following the March 3, 2021 acquisition of all outstanding common units of TC PipeLines, LP not beneficially owned by TC Energy
lower AFUDC, predominantly on account of the suspension of recording AFUDC on the Villa de Reyes project effective January 1, 2021 due to ongoing project delays
higher Income tax expense primarily due to increased flow-through income taxes in our Canadian rate-regulated pipelines and higher comparable earnings.
Comparable earnings per share reflects the impact of common shares issued for the acquisition of the remaining ownership interests in TC PipeLines, LP in first quarter 2021. Refer to the Financial condition section of this MD&A for further information on common share issuances.
Foreign exchange
Certain of our businesses generate all or most of their earnings in U.S. dollars and, since we report our financial results in Canadian dollars, changes in the value of the U.S. dollar against the Canadian dollar directly affect our comparable EBITDA and may also impact comparable earnings. As our U.S. dollar-denominated operations continue to grow, this exposure increases. A portion of the U.S. dollar-denominated comparable EBITDA exposure is naturally offset by U.S. dollar-denominated amounts below comparable EBITDA within Depreciation and amortization, Interest expense and other income statement line items. The balance of the exposure is actively managed on a rolling two-year forward basis using foreign exchange derivatives, however, the natural exposure beyond that period remains. As noted previously, the net impact of the U.S. dollar movements on comparable earnings for the three and six months ended June 30, 2021 compared to 2020, after considering natural offsets and economic hedges, was not significant.
Average exchange rate — U.S. to Canadian dollars
The average exchange rate for one U.S. dollar converted into Canadian dollars was as follows:
three months ended June 30, 20211.23 
three months ended June 30, 20201.39 
six months ended June 30, 20211.25 
six months ended June 30, 20201.37 
TC Energy Second Quarter 2021 | 13



The components of our financial results denominated in U.S. dollars are set out in the table below, including our U.S. and Mexico Natural Gas Pipelines operations along with the majority of our Liquids Pipelines business. Comparable EBITDA is a non-GAAP measure.
Pre-tax U.S. dollar-denominated income and expense itemsthree months ended
June 30
six months ended
June 30
(millions of US$)2021202020212020
Comparable EBITDA
U.S. Natural Gas Pipelines 717 595 1,550 1,361 
Mexico Natural Gas Pipelines1
151 151 310 374 
U.S. Liquids Pipelines 217 234 445 489 
1,085 980 2,305 2,224 
Depreciation and amortization(224)(214)(442)(428)
Interest on long-term debt and junior subordinated notes(313)(331)(630)(663)
Capitalized interest on capital expenditures1 39 10 51 
Allowance for funds used during construction23 42 40 75 
Non-controlling interests and other(5)(50)(60)(122)
 567 466 1,223 1,137 
1Excludes interest expense on our inter-affiliate loan with Sur de Texas which is fully offset in Interest income and other.
14 | TC Energy Second Quarter 2021



Outlook
Consolidated comparable earnings
Our overall comparable earnings per common share outlook for 2021 remains consistent with the 2020 Annual Report. We continue to monitor the impact of COVID-19 and other developments on energy markets, our construction projects and regulatory proceedings for any potential effect on our 2021 comparable earnings per common share.
Consolidated capital spending
Our expected total capital expenditures for 2021 as outlined in the 2020 Annual Report remain materially unchanged. Although we have observed some slowdown on certain of our construction activities and capital expenditures, we do not believe disruptions related to COVID-19 will be material to our overall 2021 capital program but recognize that uncertainty continues to exist.
TC Energy Second Quarter 2021 | 15



Canadian Natural Gas Pipelines
The following is a reconciliation of comparable EBITDA and comparable EBIT (our non-GAAP measures) to segmented earnings (the most directly comparable GAAP measure).
three months ended
June 30
six months ended
June 30
(millions of $)2021202020212020
NGTL System408 369 805 713 
Canadian Mainline229 223 465 448 
Other Canadian pipelines1
47 29 100 57 
Comparable EBITDA684 621 1,370 1,218 
Depreciation and amortization(323)(309)(653)(615)
Comparable EBIT 361 312 717 603 
Specific item:
Gain on partial sale of Coastal GasLink LP 370  370 
Segmented earnings361 682 717 973 
1Includes results from Foothills, Ventures LP, Great Lakes Canada, our investment in TQM, Coastal GasLink development fee revenue as well as general and administrative and business development costs related to our Canadian Natural Gas Pipelines.
Canadian Natural Gas Pipelines segmented earnings decreased by $321 million and $256 million for the three and six months ended June 30, 2021 compared to the same periods in 2020. Second quarter 2020 results included a pre-tax gain of $370 million related to the sale of a 65 per cent equity interest in Coastal GasLink LP which has been excluded from our calculation of comparable EBIT.
Net income and comparable EBITDA for our rate-regulated Canadian natural gas pipelines are primarily affected by our approved ROE, our investment base, the level of deemed common equity and incentive earnings. Changes in depreciation, financial charges and income taxes affect comparable EBITDA but do not have a significant impact on net income as they are almost entirely recovered in revenues on a flow-through basis.
NET INCOME AND AVERAGE INVESTMENT BASE
three months ended
June 30
six months ended
June 30
(millions of $)2021202020212020
Net Income
NGTL System155 139 307 274 
Canadian Mainline53 39 104 78 
Average investment base
NGTL System15,179 13,675 
Canadian Mainline3,692 3,635 
Net income for the NGTL System increased by $16 million and $33 million for the three and six months ended June 30, 2021 compared to the same periods in 2020 mainly due to a higher average investment base resulting from continued system expansions. The NGTL System is operating under the 2020-2024 Revenue Requirement Settlement which includes an ROE of 10.1 per cent on 40 per cent deemed common equity, the opportunity to increase depreciation rates if tolls fall below specified levels and an incentive mechanism for certain operating costs where variances from projected amounts are shared with our customers.
16 | TC Energy Second Quarter 2021



Net income for the Canadian Mainline increased by $14 million and $26 million for the three and six months ended June 30, 2021 compared to the same periods in 2020 largely due to higher incentive earnings and the elimination of a $20 million after-tax annual TC Energy contribution included in the previous NEB 2014 Decision. Beginning January 1, 2021, the Canadian Mainline is operating under the 2021-2026 Mainline Settlement which includes an approved ROE of 10.1 per cent on 40 per cent deemed common equity and an incentive to decrease costs and increase revenues on the pipeline under a beneficial sharing mechanism with our customers.
COMPARABLE EBITDA
Comparable EBITDA for Canadian Natural Gas Pipelines increased by $63 million and $152 million for the three and six months ended June 30, 2021 compared to the same periods in 2020 due to the net effect of:
increased rate-base earnings and higher flow-through depreciation and income taxes on the NGTL System
Coastal GasLink development fee revenue which commenced in second quarter 2020
higher flow-through income taxes, increased incentive earnings and elimination of the TC Energy contribution, partially offset by lower flow-through financial charges and depreciation on the Canadian Mainline.
DEPRECIATION AND AMORTIZATION
Depreciation and amortization increased by $14 million and $38 million for the three and six months ended June 30, 2021 compared to the same periods in 2020 mainly due to NGTL System expansion facilities that were placed in service, partially offset by lower depreciation on the Canadian Mainline.
TC Energy Second Quarter 2021 | 17



U.S. Natural Gas Pipelines
On March 3, 2021, we acquired all the outstanding common units of TC PipeLines, LP not beneficially owned by TC Energy or our affiliates in exchange for TC Energy common shares (TC PipeLines, LP acquisition). Refer to the Recent developments section for additional information. TC PipeLines, LP results for the three and six months ended June 30, 2021 and comparative results for the same periods in 2020 reflect our ownership interests in eight natural gas pipelines prior to the acquisition.
The table below is a reconciliation of comparable EBITDA and comparable EBIT (our non-GAAP measures) to segmented earnings (the most directly comparable GAAP measure).
three months ended
June 30
six months ended
June 30
(millions of US$, unless otherwise noted)2021202020212020
Columbia Gas355 288 763 660 
ANR150 114 301 261 
Columbia Gulf52 47 109 97 
Great Lakes1,4
36 17 77 47 
GTN2,4
40 — 55 — 
Other U.S. pipelines3,4
77 22 137 50 
TC PipeLines, LP4,5
 26 24 60 
Non-controlling interests5
7 81 84 186 
Comparable EBITDA 717 595 1,550 1,361 
Depreciation and amortization(153)(144)(301)(288)
Comparable EBIT564 451 1,249 1,073 
Foreign exchange impact128 174 310 390 
Comparable EBIT (Cdn$)
692 625 1,559 1,463 
Specific item:
Risk management activities(4)— 2 — 
Segmented earnings (Cdn$)
688 625 1,561 1,463 
1Results reflect our 53.55 per cent direct interest in Great Lakes until March 3, 2021 and our 100 per cent ownership interest subsequent to the TC PipeLines, LP acquisition.
2Reflects 100 per cent of GTN's earnings subsequent to the TC PipeLines, LP acquisition on March 3, 2021.
3Reflects earnings from our ownership in our mineral rights business (CEVCO), Crossroads, and our share of equity income from Millennium and Hardy Storage, as well as general and administrative and business development costs related to our U.S. natural gas pipelines. For the period subsequent to the TC PipeLines, LP acquisition on March 3, 2021, results also include 100 per cent of Bison, North Baja, and Tuscarora, 61.7 per cent of Portland, plus our equity income from Northern Border and Iroquois.
4Our ownership interest in TC PipeLines, LP was 25.5 per cent prior to the acquisition on March 3, 2021, at which time it became 100 per cent. Prior to March 3, 2021, results reflected TC PipeLines, LP’s 46.45 per cent interest in Great Lakes, its ownership of GTN, Bison, North Baja, Portland and Tuscarora as well as its share of equity income from Northern Border and Iroquois.
5Reflects earnings attributable to portions of TC PipeLines, LP and Portland that we did not own prior to the TC PipeLines, LP acquisition on March 3, 2021, and subsequently reflects earnings attributable to the remaining 38.3 per cent interest in Portland we do not own.
U.S. Natural Gas Pipelines segmented earnings increased by $63 million and $98 million for the three and six months ended June 30, 2021 compared to the same periods in 2020 and included unrealized losses and gains from changes in the fair value of derivatives related to our U.S. Natural Gas marketing business in 2021 which have been excluded from our calculation of comparable EBIT. A weaker U.S. dollar in 2021 had a negative impact on the Canadian dollar equivalent segmented earnings from our U.S. operations compared to the same period in 2020. Refer to the Consolidated results – Foreign exchange section for additional information.
18 | TC Energy Second Quarter 2021



Comparable EBITDA for U.S. Natural Gas Pipelines increased by US$122 million and US$189 million for the three and six months ended June 30, 2021 compared to the same periods in 2020 and was primarily due to the net effect of:
a net increase in earnings from Columbia Gas following the application for higher transportation rates effective February 1, 2021, subject to refund upon completion of the rate proceeding, along with incremental earnings resulting from greater capitalized pipeline integrity costs in 2021 compared to 2020, partially offset by higher property taxes. Refer to the Recent developments section for additional information
increased earnings across our U.S. Natural Gas Pipelines assets due to the cold weather events of first quarter 2021 impacting many of the U.S. markets in which we operate.
The positive impact on comparable earnings following the March 3, 2021 TC PipeLines, LP acquisition noted above is reflected through a reduction in Non-controlling interests. Refer to the Corporate – Net income attributable to non-controlling interests section for additional information.
DEPRECIATION AND AMORTIZATION
Depreciation and amortization increased by US$9 million and US$13 million for the three and six months ended June 30, 2021 compared to the same periods in 2020 mainly due to new projects placed in service.
TC Energy Second Quarter 2021 | 19



Mexico Natural Gas Pipelines
The following is a reconciliation of comparable EBITDA and comparable EBIT (our non-GAAP measures) to segmented earnings (the most directly comparable GAAP measure).
three months ended
June 30
six months ended
June 30
(millions of US$, unless otherwise noted)2021202020212020
Topolobampo40 40 81 80 
Sur de Texas1
27 28 61 122 
Tamazunchale31 30 62 60 
Guadalajara18 15 37 31 
Mazatlán18 17 35 35 
Comparable EBITDA134 130 276 328 
Depreciation and amortization(22)(22)(44)(44)
Comparable EBIT112 108 232 284 
Foreign exchange impact26 43 58 106 
Comparable EBIT and segmented earnings (Cdn$)
138 151 290 390 
1Represents equity income from our 60 per cent interest and fees earned from the construction and operation of the pipeline.
Mexico Natural Gas Pipelines comparable EBIT and segmented earnings decreased by $13 million and $100 million for the three and six months ended June 30, 2021 compared to the same periods in 2020. Lower comparable EBITDA and a weaker U.S. dollar for the three and six months ended June 30, 2021 had a negative impact on the Canadian dollar equivalent segmented earnings compared to the same periods in 2020. Refer to the Consolidated results – Foreign exchange section for additional information.
Comparable EBITDA for Mexico Natural Gas Pipelines increased by US$4 million for the three months ended June 30, 2021 compared to the same period in 2020 primarily as a result of increased earnings on Guadalajara following the implementation of a flow reversal completed in 2020, and decreased by US$52 million for the six months ended June 30, 2021 compared to the same period in 2020 mainly attributable to US$55 million of fees recognized in first quarter 2020 associated with the successful completion of the Sur de Texas pipeline.
DEPRECIATION AND AMORTIZATION
Depreciation and amortization for the three and six months ended June 30, 2021 was consistent with the same periods in 2020.
20 | TC Energy Second Quarter 2021



Liquids Pipelines
The following is a reconciliation of comparable EBITDA and comparable EBIT (our non-GAAP measures) to segmented earnings/(losses) (the most directly comparable GAAP measure).
three months ended
June 30
six months ended
June 30
(millions of $)2021202020212020
Keystone Pipeline System311 380 629 768 
Intra-Alberta pipelines1
23 23 45 47 
Liquids marketing and other32 29 85 62 
Comparable EBITDA366 432 759 877 
Depreciation and amortization(78)(85)(158)(167)
Comparable EBIT288 347 601 710 
Specific items:
Keystone XL asset impairment charge and other(9)— (2,854)— 
Keystone XL preservation and other(15)— (15)— 
Risk management activities(14)(41)10 
Segmented earnings/(losses)250 306 (2,258)717 
Comparable EBITDA denominated as follows:   
Canadian dollars100 107 204 209 
U.S. dollars217 234 445 489 
Foreign exchange impact49 91 110 179 
Comparable EBITDA366 432 759 877 
1Intra-Alberta pipelines include Grand Rapids, White Spruce and Northern Courier.
Liquids Pipelines segmented earnings decreased by $56 million and $2,975 million for the three and six months ended June 30, 2021 compared to the same periods in 2020 and included the following specific items which have been excluded from our calculation of comparable EBIT and comparable earnings:
a $9 million and $2,854 million pre-tax asset impairment charge, net of expected contractual recoveries and other contractual and legal obligations, for the three and six months ended June 30, 2021, associated with the termination of the Keystone XL pipeline and related projects following the January 20, 2021 revocation of the Presidential Permit. Refer to the Recent developments section for additional information
pre-tax preservation and other costs of $15 million for the three and six months ended June 30, 2021 related to the preservation and storage of the Keystone XL pipeline project assets which could not be accrued as part of the Keystone XL impairment charge
unrealized losses and gains from changes in the fair value of derivatives related to our liquids marketing business.
A weaker U.S. dollar in 2021 had a negative impact on the Canadian dollar equivalent segmented earnings from our U.S. operations compared to the same periods in 2020. Refer to the Consolidated results – Foreign exchange section for additional information.

TC Energy Second Quarter 2021 | 21



Comparable EBITDA for Liquids Pipelines decreased by $66 million and $118 million for the three and six months ended June 30, 2021 compared to the same periods in 2020 and was primarily due to the net effect of:
lower volumes on the Keystone Pipeline System
increased contributions from liquids marketing activities mainly attributable to higher margins and volumes.
DEPRECIATION AND AMORTIZATION
Depreciation and amortization decreased by $7 million and $9 million for the three and six months ended June 30, 2021 compared to the same periods in 2020 primarily as a result of a weaker U.S. dollar.
22 | TC Energy Second Quarter 2021



Power and Storage
The following is a reconciliation of comparable EBITDA and comparable EBIT (our non-GAAP measures) to segmented earnings/(losses) (the most directly comparable GAAP measure).
three months ended
June 30
six months ended
June 30
(millions of $)2021202020212020
Bruce Power1
90 80 184 199 
Canadian Power2
57 55 126 125 
Natural Gas Storage and other10 — 28 
Comparable EBITDA157 135 338 329 
Depreciation and amortization(19)(12)(38)(30)
Comparable EBIT138 123 300 299 
Specific items:
Gain/(loss) on sale of Ontario natural gas-fired power plants17 (145)17 (261)
Risk management activities 3 (9)4 (5)
Segmented earnings/(losses) 158 (31)321 33 
1Represents our share of equity income from Bruce Power.
2Includes Napanee from in-service in March 2020 and our other Ontario natural gas-fired power plants until sold in April 2020.
Power and Storage segmented earnings increased by $189 million and $288 million for the three and six months ended June 30, 2021 compared to the same periods in 2020 and included the following specific items which have been excluded from comparable EBIT:
a $17 million pre-tax recovery of certain costs from the IESO in second quarter 2021 associated with the Ontario natural gas-fired power plants sold in 2020. Incremental pre-tax losses on the sale of $145 million and $261 million were recorded in the three and six months ended June 30, 2020
unrealized gains and losses from changes in the fair value of derivatives used to reduce our exposure to certain commodity price risks.
Comparable EBITDA for Power and Storage increased by $22 million and $9 million for the three and six months ended June 30, 2021 compared to the same periods in 2020 primarily due to the net effect of:
increased Bruce Power contribution for the three months ended June 30, 2021 compared to the same period in 2020 driven by higher volumes resulting from fewer outage days and a higher contract price, partially offset by increased operating expenses. Decreased results for the six months ended June 30, 2021 versus the same period in 2020 were mainly attributable to increased operating expenses and lower volumes resulting from greater outage days, partially offset by gains in 2021 on funds invested for post-retirement benefits. Additional financial and operating information on Bruce Power is provided below
increased Natural Gas Storage and other earnings as a result of the November 2020 acquisition of the remaining 50 per cent ownership interest in TC Turbines and higher realized Alberta natural gas storage spreads
consistent Canadian Power earnings reflecting higher realized margins in 2021 as well as earnings from our MacKay River cogeneration facility following its return to service in May 2020, offset by the sale of our Ontario natural gas-fired power plants in April 2020.
DEPRECIATION AND AMORTIZATION
Depreciation and amortization increased $7 million and $8 million for the three and six months ended June 30, 2021 compared to the same periods in 2020 and includes incremental TC Turbines depreciation following the November 2020 acquisition of the remaining 50 per cent ownership interest as well as other adjustments in second quarter 2020.
TC Energy Second Quarter 2021 | 23



BRUCE POWER
The following reflects our proportionate share of the components of comparable EBITDA and comparable EBIT.
three months ended
June 30
six months ended
June 30
(millions of $, unless otherwise noted)2021202020212020
Equity income included in comparable EBITDA and EBIT comprised of:
Revenues1
405 371 809 838 
Operating expenses(238)(211)(463)(447)
Depreciation and other(77)(80)(162)(192)
Comparable EBITDA and EBIT2
90 80 184 199 
Bruce Power – other information  
Plant availability3,4
85 %79 %85 %86 %
Planned outage days4
91 123 165 169 
Unplanned outage days7 22 12 
Sales volumes (GWh)2
5,032 4,716 10,096 10,308 
Realized power price per MWh5
$81 $80 $80 $81 
1Net of amounts recorded to reflect operating cost efficiencies shared with the IESO.
2Represents our 48.3 per cent (2020 – 48.4 per cent) ownership interest in Bruce Power. Sales volumes include deemed generation and Unit 6 output until January 2020 when its MCR program commenced.
3The percentage of time the plant was available to generate power, regardless of whether it was running.
4Excludes Unit 6 MCR outage days.
5Calculation based on actual and deemed generation. Realized power price per MWh includes realized gains and losses from contracting activities and cost flow-through items. Excludes unrealized gains and losses on contracting activities and non-electricity revenues.
The Unit 6 MCR outage commenced in January 2020. Planned maintenance on Unit 1 was completed in first quarter 2021 and commenced on Unit 3 in March 2021. During the Unit 6 MCR and Unit 3 outages currently underway, certain findings arose that are expected to result in a delay to the return to service of Unit 3. Refer to the Recent developments section of this MD&A for further information. Planned maintenance is still expected to occur on Unit 7 in fourth quarter 2021 and the average 2021 plant availability, excluding the Unit 6 MCR, is now expected to be in the low-80 per cent range.
24 | TC Energy Second Quarter 2021



Corporate
The following is a reconciliation of comparable EBITDA and comparable EBIT (our non-GAAP measures) to Corporate segmented (losses)/earnings (the most directly comparable GAAP measure).
three months ended
June 30
six months ended
June 30
(millions of $)2021202020212020
Comparable EBITDA and EBIT(4)(7)
Specific item:
Foreign exchange (loss)/gain – inter-affiliate loans1
(32)(26)3 277 
Segmented (losses)/earnings
(36)(20)(4)281 
1Reported in Income from equity investments in the Condensed consolidated statement of income.
Corporate segmented losses increased by $16 million for the three months ended June 30, 2021 while Corporate segmented earnings decreased by $285 million for the six months ended June 30, 2021 compared to the same periods in 2020 and included foreign exchange losses and gains on our proportionate share of peso-denominated inter-affiliate loans to the Sur de Texas joint venture from its partners. These amounts are recorded in Income from equity investments in the Corporate segment and have been excluded from our calculation of comparable EBITDA and EBIT as they are fully offset by corresponding foreign exchange gains and losses on the inter-affiliate loan receivable included in Interest income and other. Refer to the Financial risks and financial instruments – Related party transactions section for additional information.
Comparable EBITDA and EBIT for Corporate decreased by $10 million and $11 million for the three and six months ended June 30, 2021 compared to the same periods in 2020 primarily due to a U.S. capital tax adjustment recorded in second quarter 2020.
Interest expense
 
three months ended
June 30
six months ended
June 30
(millions of $)2021202020212020
Interest on long-term debt and junior subordinated notes
Canadian dollar-denominated(177)(176)(347)(333)
U.S. dollar-denominated (313)(331)(630)(663)
Foreign exchange impact(73)(127)(157)(242)
(563)(634)(1,134)(1,238)
Other interest and amortization expense(15)(14)(31)(52)
Capitalized interest1 87 18 151 
Interest expense included in comparable earnings(577)(561)(1,147)(1,139)
Specific item:
Keystone XL preservation and other (6)— (6)— 
Interest expense (583)(561)(1,153)(1,139)
TC Energy Second Quarter 2021 | 25



Interest expense increased by $22 million and $14 million for the three and six months ended June 30, 2021 compared to the same periods in 2020 and included $6 million in second quarter 2021 related to the Keystone XL project-level credit facility for the period following the revocation of the Presidential Permit for the Keystone XL pipeline. This has been removed from our calculation of interest expense included in comparable earnings.
Interest expense included in comparable earnings increased by $16 million and $8 million for the three and six months ended June 30, 2021 compared to the same periods in 2020 primarily due to the net effect of:
lower capitalized interest due to its cessation for the Keystone XL pipeline project following the revocation of the Presidential Permit in January 2021, the change to equity accounting for our Coastal GasLink investment upon the sale of a 65 per cent interest in Coastal GasLink LP in second quarter 2020 and the completion of the Napanee power plant in first quarter 2020
long-term debt issuances, net of maturities. Refer to the Financial condition section for additional information
lower interest rates on reduced levels of short-term borrowings
the foreign exchange impact from a weaker U.S. dollar on translation of U.S. dollar-denominated interest.
Allowance for funds used during construction
 three months ended
June 30
six months ended
June 30
(millions of $)2021202020212020
Canadian dollar-denominated36 23 64 60 
U.S. dollar-denominated23 42 40 75 
Foreign exchange impact5 16 10 28 
Allowance for funds used during construction64 81 114 163 
AFUDC decreased by $17 million and $49 million for the three and six months ended June 30, 2021 compared to the same periods in 2020. The increases in Canadian dollar-denominated AFUDC are primarily related to a higher balance of NGTL System expansion projects under construction. The decreases in U.S. dollar-denominated AFUDC are mainly the result of the suspension of recording AFUDC on the Villa de Reyes project effective January 1, 2021 due to ongoing delays on the project, partially offset by increased capital expenditures on ANR pipeline projects.
Interest income and other
 three months ended
June 30
six months ended
June 30
(millions of $)2021202020212020
Interest income and other included in comparable earnings158 250 55 
Specific items:
Foreign exchange gains/(losses) – inter-affiliate loan 32 26 (3)(277)
Risk management activities(63)170 (58)(102)
Interest income and other127 203 189 (324)
Interest income and other decreased by $76 million and increased by $513 million for the three and six months ended June 30, 2021 compared to the same periods in 2020 and included the following specific items which have been removed from our calculation of Interest income and other included in comparable earnings:
foreign exchange gains and losses on the peso-denominated inter-affiliate loan receivable from the Sur de Texas joint venture
unrealized losses and gains from changes in the fair value of derivatives used to manage our foreign exchange risk.
26 | TC Energy Second Quarter 2021



Our proportionate share of the corresponding foreign exchange losses and gains and interest expense on the peso-denominated inter-affiliate loans to the Sur de Texas joint venture from its partners are reflected in Income from equity investments in the Corporate and Mexico Natural Gas Pipelines segments, respectively. The foreign exchange gains and losses on these inter-affiliate loans are removed from comparable earnings while the interest income and interest expense are included in comparable earnings with all amounts offsetting and resulting in no impact on net income. Refer to the Financial risks and financial instruments – Related Party Transactions section for additional information.
Interest income and other included in comparable earnings increased by $151 million and $195 million for the three and six months ended June 30, 2021 compared to the same periods in 2020 mainly due to realized gains in 2021 compared to realized losses in 2020 on derivatives used to manage our net exposure to foreign exchange rate fluctuations on U.S. dollar-denominated income.
Income tax (expense)/recovery
 three months ended
June 30
six months ended
June 30
(millions of $)2021202020212020
Income tax expense included in comparable earnings(175)(125)(379)(336)
Specific items:
Keystone XL asset impairment charge and other1
7 — 660 — 
Keystone XL preservation and other1
5 — 5 — 
Income tax valuation allowance release —  281 
Gain/(loss) on sale of Ontario natural gas-fired power plants(4)65 (4)104 
Gain on partial sale of Coastal GasLink LP 38  38 
Risk management activities20 (30)11 25 
Income tax (expense)/recovery(147)(52)293 112 
1Includes $7 million of deferred income tax recovery and $5 million of current income tax recovery for the three months ended June 30, 2021 and $785 million of deferred income tax recovery and $120 million of current income tax expense for the six months ended June 30, 2021.
Income tax expense increased by $95 million for the three months ended June 30, 2021 compared to the same period in 2020 primarily due to the release of income tax valuation allowances related to the Ontario natural gas-fired power plant and Coastal GasLink LP sale transactions and the non-taxable portion of capital gains recognized in second quarter 2020. Income tax recovery increased by $181 million for the six months ended June 30, 2021 compared to the same period in 2020 primarily due to the income tax impact of the Keystone XL pipeline project asset impairment charge in 2021, partially offset by the income tax valuation allowance release of $281 million which was recorded in first quarter 2020 following our reassessment of deferred income tax assets that are deemed more likely than not to be realized along with the release of income tax valuation allowances related to the Ontario natural gas-fired power plant and Coastal GasLink LP sale transactions and the non-taxable portion of capital gains recognized in second quarter 2020. These items were removed from Income tax expense included in comparable earnings in addition to the income tax impacts of the specific items referenced elsewhere in this MD&A.
Income tax expense included in comparable earnings increased by $50 million and $43 million for the three and six months ended June 30, 2021 compared to the same periods in 2020 primarily due to higher flow-through income taxes on Canadian rate-regulated pipelines and increased earnings, partially offset by higher foreign income tax rate differentials.
TC Energy Second Quarter 2021 | 27



Net income attributable to non-controlling interests
 three months ended
June 30
six months ended
June 30
(millions of $)2021202020212020
Net income attributable to non-controlling interests(6)(63)(75)(159)
Net income attributable to non-controlling interests for the three and six months ended June 30, 2021 decreased by $57 million and $84 million compared to the same periods in 2020 primarily as a result of the March 3, 2021 acquisition of all outstanding common units of TC PipeLines, LP not beneficially owned by TC Energy. Subsequent to the acquisition, TC PipeLines, LP became an indirect, wholly-owned subsidiary of TC Energy. Refer to the U.S. Natural Gas Pipelines section and Note 10, Non-controlling interests, of our Condensed consolidated financial statements for additional information.
Preferred share dividends
three months ended
June 30
six months ended
June 30
(millions of $)2021202020212020
Preferred share dividends(32)(40)(70)(81)
Preferred share dividends decreased by $8 million and $11 million for the three and six months ended June 30, 2021 compared to the same periods in 2020 primarily due to the redemption of all issued and outstanding Series 13 preferred shares on May 31, 2021.
28 | TC Energy Second Quarter 2021



Recent developments
COVID-19
Amid the ongoing adaptations and restrictions in place as a result of the COVID-19 pandemic, we continue to effectively operate our assets, conduct commercial activities and execute on projects with a focus on health, safety and reliability. While it remains premature to ascertain any long-term impact that COVID-19 may have on our capital program, directionally we have observed some slowdown on certain of our construction activities and capital expenditures largely due to permitting delays as regulators have been unable to process permits and conduct consultations within timeframes that were originally anticipated. Additional details for capital projects more significantly impacted by COVID-19 are provided below.
The degree to which COVID-19 has a more pronounced longer-term impact on our operations and growth projects will depend on future developments, policies and actions, all of which remain somewhat uncertain. Additional information regarding the risks, uncertainties and impact on our business from COVID-19 can be found throughout this MD&A including the Capital program, Outlook and the Financial risks and financial instruments sections.
CANADIAN NATURAL GAS PIPELINES
Coastal GasLink
From December 2020 until April 13, 2021, in response to the COVID-19 pandemic, an order of the British Columbia Provincial Health Officer restricted the number of workers on industrial sites across northern British Columbia, including Coastal GasLink, and, as a result, only critical construction activities continued during this time. Major erosion and sediment control work was required in the absence of continued pipeline construction during the winter period. On April 13, 2021, the provincial health order was lifted allowing the project to finalize remobilization plans for the summer construction program.
As a result of scope changes, permit delays and the impacts from COVID-19, including the provincial health order, we continue to expect project costs to increase significantly along with a delay to project completion compared to the original project cost and schedule. Coastal GasLink has sought and will continue to mitigate cost increases and schedule delays. Coastal GasLink expects incremental costs will be included in the final pipeline tolls, subject to certain conditions.
Coastal GasLink is in dispute with LNG Canada with respect to the recognition of certain costs and the impacts on schedule. If a resolution is not reached in the near term, Coastal GasLink may be required to suspend certain key construction activities but would continue with work required for safety reasons and compliance with regulatory requirements. Any equity required to be contributed by Coastal GasLink LP partners, including us, to fund incremental costs will be determined by the substance of a resolution with LNG Canada.
Coastal GasLink continues to have access to a subordinated demand revolving facility with TC Energy which provides the project with additional short-term funding and financial flexibility and on which $220 million was drawn at June 30, 2021. If necessary, as an interim measure, the total amount of available credit facilities provided to Coastal GasLink by TC Energy may be expanded to allow Coastal GasLink to access incremental short-term funding as a bridge to a required increase in project-level financing or project recoveries.
NGTL System
In the six months ended June 30, 2021, the NGTL System placed approximately $0.1 billion of capacity projects in service.
TC Energy Second Quarter 2021 | 29



U.S. NATURAL GAS PIPELINES
Columbia Gas Section 4 Rate Case
Columbia Gas filed a Section 4 Rate Case with FERC in July 2020 requesting an increase to its maximum transportation rates effective February 1, 2021, subject to refund upon completion of the rate proceeding. On July 28, 2021, Columbia Gas notified FERC that it has reached a settlement-in-principle with its customers addressing all remaining issues in the case, including but not limited to the resolution of rates and continuation of Columbia Gas's modernization program. While definitive terms are still being finalized, Columbia Gas expects a final settlement to be filed with FERC in third quarter 2021, with 2021 revenue expected to be generally consistent with estimates recorded to date, subject to revision following completion and approval of settlement terms.
Acquisition of TC PipeLines, LP
On March 3, 2021, we completed the previously announced acquisition pursuant to the agreement dated December 14, 2020. Refer to the Recent developments – Corporate section for additional information.
Grand Chenier XPress
Phase I of Grand Chenier XPress, an expansion project on the ANR pipeline system connecting supply directly to U.S. Gulf Coast LNG export facilities, went into service in April 2021. Phase II is expected to be placed in service in early 2022.
VR Project
We are actively developing projects that will replace and upgrade certain facilities while reducing emissions along portions of our pipeline systems in principal delivery markets. The enhanced facilities will improve reliability of the systems and allow for additional transportation services to address growing demand under long-term contracts while reducing direct carbon dioxide equivalent (CO2e) emissions. Consistent with this initiative, the VR project on the Columbia Gas system has been sanctioned, subject to customary conditions precedent and normal-course regulatory approvals and is included in the Secured projects table within the Capital program section of this MD&A. This project represents an approximate US$0.7 billion capital investment and is targeted to be placed in service during the second half of 2025.
MEXICO NATURAL GAS PIPELINES
Tula and Villa de Reyes
The CFE initiated arbitration in June 2019 for the Tula and Villa de Reyes projects, disputing fixed capacity payments due to force majeure events. Arbitration proceedings are currently suspended while management advances settlement discussions with the CFE.
Villa de Reyes construction is ongoing but has been delayed due to COVID-19 contingency measures which have impeded our ability to obtain work authorizations as a result of administrative closures. We expect to reach partial in-service by the end of 2021, with the remainder of the construction of Villa de Reyes completed in the first half of 2022.
LIQUIDS PIPELINES
Keystone XL
On June 9, 2021, following the revocation of the Presidential Permit for the Keystone XL pipeline project on January 20, 2021, and after a comprehensive review of options in consultation with our partner, the Government of Alberta, we terminated the Keystone XL pipeline project.
The Keystone XL investment was evaluated for impairment in first quarter 2021 along with our investments in related capital projects including Heartland Pipeline, TC Terminals and Keystone Hardisty Terminal. We determined that the carrying amount of these assets was no longer fully recoverable. As a result, we recognized an asset impairment charge, net of expected contractual recoveries and other contractual and legal obligations related to termination activities, of $2.8 billion ($2.2 billion after tax) for the six months ended June 30, 2021, which was excluded from comparable earnings. The asset impairment charge was based on the excess of the carrying value of $3.3 billion over the estimated fair value of $0.2 billion.
30 | TC Energy Second Quarter 2021



Termination activities and related costs will continue through 2022 with any adjustments to the estimated fair value and future contractual and legal obligations expensed as determined and excluded from comparable earnings. Refer to Note 5, Keystone XL, of our Condensed consolidated financial statements for additional information.
Although we recorded a $2.2 billion after-tax asset impairment charge, net of expected contractual recoveries and other contractual and legal obligations related to the Keystone XL pipeline project termination activities, a significant portion of this amount was shared with the Government of Alberta, thereby reducing the net financial impact to TC Energy. In June 2021, Class A Interests previously issued to the Government of Alberta totaling $394 million were repurchased for a nominal amount, the $1.0 billion (US$849 million) balance on the credit facility was guaranteed and fully paid by the Government of Alberta and $91 million of Class C Interests were issued to the Government of Alberta entitling them to future liquidation proceeds from specified Keystone XL project assets. After considering these transactions, including the tax impact thereon, the net financial impact to us as a result of the termination of Keystone XL and related projects at June 30, 2021 was $1.1 billion determined as follows:
(millions of $)June 30, 2021
Asset impairment charge and other (after tax)1
2,194 
Government of Alberta Class A Interests repurchased for a nominal amount2
(394)
Credit facility balance – guaranteed and paid by the Government of Alberta (net) 2,3
(737)
Net financial impact of the termination of the Keystone XL pipeline project1,063 
1Refer to Note 5, Keystone XL, of our Condensed consolidated financial statements for additional information.
2Recognized through the Condensed consolidated statement of equity.
3Net of income taxes and Class C Interests issued.
After the Presidential Permit was revoked, construction activities ceased except for certain activities required to clean up and reclaim worksites in adherence to our commitment to safety, the environment, and our regulatory requirements. We will continue to coordinate with regulators, stakeholders and Indigenous groups to meet our environmental and regulatory commitments and ensure a safe exit from the Keystone XL pipeline project. The majority of these associated costs were funded through a final drawdown on the project-level credit facility which occurred in June 2021, subsequent to which the credit facility was fully repaid by the Government of Alberta and terminated.
Legacy challenges to the 2019 Presidential Permit and the Bureau of Land Management Grant of Right-of-Way remain pending before the federal district court in Montana. With the revocation of the Presidential Permit and termination of the project, we have moved to dismiss the pending challenge to the Presidential Permit and are coordinating with the Department of Justice with respect to dismissal of the remaining cases.
On July 2, 2021, TC Energy filed a Notice of Intent to initiate a legacy North American Free Trade Agreement (NAFTA) claim to recover economic damages resulting from the revocation of the Presidential Permit for the Keystone XL pipeline. We will be seeking to recover more than US$15 billion in damages as a result of the U.S. Government's breach of its NAFTA obligations. This claim is in a preliminary stage and the timing of outcome is unknown at present.
Port Neches
On March 8, 2021, we entered a joint venture with Motiva Enterprises (Motiva) to construct the US$152 million Port Neches Link pipeline system which will connect the Keystone Pipeline System to Motiva’s Port Neches Terminal, which supplies 630,000 Bbl/d to their Port Arthur refinery. This common carrier pipeline system will also include facilities to tie in additional liquids terminals to the Keystone Pipeline System with other downstream infrastructure and is expected to be in service in the second half of 2022.
TC Energy Second Quarter 2021 | 31



POWER AND STORAGE
Renewable energy requests for information (RFI)
Through an RFI process in second quarter 2021, we announced that we were seeking to identify potential contracts and/or investment opportunities in up to 620 MW of wind energy projects, 300 MW of solar projects and 100 MW of energy storage projects to meet the electricity needs of a portion of our U.S. pipeline assets. We are currently evaluating the responses received.
Bruce Power outage
As part of the planned inspections, testing, analysis and maintenance activities at Bruce Power during the current Unit 6 MCR outage and planned Unit 3 outage, higher than anticipated readings of hydrogen concentration in pressure tubes were detected. The other six units currently in operation at the facility have all been inspected during recent planned outages and it was determined that there is no impact on their safe operation. Bruce Power has advised the Canadian Nuclear Safety Commission (CNSC) and is working on next steps.
These developments are expected to result in a delay to the return to service of Unit 3 following its planned outage which was expected to be completed in early fourth quarter 2021. The timing of the return to service will depend upon the final results of the analysis and Bruce Power’s submission to CNSC. We do not expect this development to have a material impact on our earnings or cash flows.
ALBERTA CARBON GRID
On June 17, 2021, we announced a partnership with Pembina Pipeline Corporation to jointly develop a carbon transportation and sequestration system which, when fully constructed, would be capable of transporting more than 20 million tonnes of CO2 annually. By leveraging existing pipelines and a newly developed sequestration hub, the Alberta Carbon Grid (ACG) is expected to provide an infrastructure platform for Alberta-based industries to manage their emissions and contribute to a lower-carbon economy. Designed to be an open-access system, the ACG would connect the Fort McMurray, Alberta Industrial Heartland and Drayton Valley regions to key sequestration locations and delivery points across the province.
CORPORATE
Retirement and appointment of our Executive Vice-President and CFO
On May 17, 2021, we announced that Don Marchand, Executive Vice-President and Chief Financial Officer (CFO), will retire from TC Energy on November 1, 2021, stepping down as CFO on July 31, 2021. Joel Hunter, currently Senior Vice-President, Capital Markets, will succeed Mr. Marchand as Executive Vice-President and CFO. Mr. Marchand will assist Mr. Hunter with the transition from August through November.
Acquisition of TC PipeLines, LP
On March 3, 2021, we completed the acquisition of all of the outstanding common units of TC PipeLines, LP not beneficially owned by TC Energy, resulting in TC PipeLines, LP becoming an indirect, wholly-owned subsidiary of TC Energy. Upon close of the transaction and in accordance with the acquisition terms, TC PipeLines, LP common unitholders received 0.70 common shares of TC Energy for each issued and outstanding publicly-held TC PipeLines, LP common unit resulting in the issuance of 38 million TC Energy common shares valued at approximately $2.1 billion, net of transaction costs. Refer to Note 10, Non-controlling interests, of our Condensed consolidated financial statements for additional information.

32 | TC Energy Second Quarter 2021



Financial condition
We strive to maintain financial strength and flexibility in all parts of the economic cycle. We rely on our operating cash flows to sustain our business, pay dividends and fund a portion of our growth. In addition, we access capital markets and engage in portfolio management to meet our financing needs, manage our capital structure and to preserve our credit ratings.
We believe we have the financial capacity to fund our existing capital program through predictable and growing cash flows from operations, access to capital markets, portfolio management, joint ventures, asset-level financing, cash on hand and substantial committed credit facilities. Annually, in fourth quarter, we renew and extend our credit facilities as required.
At June 30, 2021, our current assets totaled $8.3 billion and current liabilities amounted to $13.7 billion, leaving us with a working capital deficit of $5.4 billion compared to $6.8 billion at December 31, 2020. Our working capital deficiency is considered to be in the normal course of business and is managed through:
our ability to generate predictable and growing cash flows from operations
a total of $9.8 billion of committed revolving credit facilities of which $8.3 billion of short-term borrowing capacity remains available, net of $1.5 billion backstopping outstanding commercial paper balances. We also have arrangements in place for a further $2.4 billion of demand credit facilities of which $1.2 billion remains available as of June 30, 2021
our access to capital markets, including through securities issuances, incremental credit facilities, portfolio management activities, DRP and Corporate ATM programs, if deemed appropriate.
CASH PROVIDED BY OPERATING ACTIVITIES
 three months ended
June 30
six months ended
June 30
(millions of $)2021202020212020
Net cash provided by operations1,711 1,613 3,377 3,336 
Increase/(decrease) in operating working capital27 (64)259 307 
Funds generated from operations1,738 1,549 3,636 3,643 
Specific item:
Current income tax (recovery)/expense on Keystone XL asset impairment charge, preservation and other(5)— 120 — 
Keystone XL preservation and other21 — 21 — 
Comparable funds generated from operations1,754 1,549 3,777 3,643 
Net Cash Provided by Operations
Net cash provided by operations increased by $98 million for the three months ended June 30, 2021 compared to the same period in 2020 primarily due to higher funds generated from operations, partially offset by the amount and timing of working capital changes. Net cash provided by operations increased by $41 million for the six months ended June 30, 2021 compared to the same period in 2020 mainly due to the amount and timing of working capital changes.
Comparable Funds Generated From Operations
Comparable funds generated from operations, a non-GAAP measure, helps us assess the cash generating ability of our businesses by excluding the timing effects of working capital changes as well as the cash impact of our specific items.
Comparable funds generated from operations increased by $205 million for the three months ended June 30, 2021 compared to the same period in 2020 primarily due to higher comparable earnings, including lower current income taxes.
Comparable funds generated from operations increased by $134 million for the six months ended June 30, 2021 compared to the same period in 2020 primarily due to higher comparable earnings, including lower current income taxes, which was partially offset by fees collected in 2020 associated with the successful completion of the Sur de Texas pipeline.
TC Energy Second Quarter 2021 | 33



CASH USED IN INVESTING ACTIVITIES
 three months ended
June 30
six months ended
June 30
(millions of $)2021202020212020
Capital spending
Capital expenditures(1,214)(1,990)(2,859)(3,986)
Capital projects in development  —  (122)
Contributions to equity investments(225)(160)(465)(311)
(1,439)(2,150)(3,324)(4,419)
Proceeds from sale of assets, net of transaction costs 3,407  3,407 
Loan to affiliate(220)— (220)— 
Deferred amounts and other(98)(73)(404)(222)
Net cash (used in)/provided by investing activities (1,757)1,184 (3,948)(1,234)
Capital expenditures in 2021 were incurred primarily for the expansion of the NGTL System, the ANR pipeline system and Columbia Gas projects as well as maintenance capital expenditures. Lower capital spending in 2021 compared to 2020 reflects the sale of a 65 per cent equity interest in and subsequent equity accounting for Coastal GasLink LP in second quarter 2020, along with reduced spending on the NGTL System and Columbia Gas projects and the completion of the Napanee power plant in 2020.
Costs incurred on capital projects in development in 2020 were mostly attributable to spending on the Keystone XL pipeline project prior to its reclassification to Plant, property and equipment upon reaching a positive final investment decision in March 2020.
Contributions to equity investments increased in 2021 compared to 2020 mainly due to higher investment in Bruce Power.
In second quarter 2020, we closed the sale of our Ontario natural gas-fired power plants for net proceeds of approximately $2.8 billion and the sale of a 65 per cent equity interest in Coastal GasLink LP for net proceeds of $656 million.
TC Energy entered into a subordinated demand revolving credit facility with Coastal GasLink LP to provide additional short-term liquidity and funding flexibility to the project. During the three months ended June 30, 2021, $220 million was drawn on this facility. Refer to Note 7, Loans receivable from affiliates, of our Condensed consolidated financial statements for additional information.
34 | TC Energy Second Quarter 2021



CASH PROVIDED BY FINANCING ACTIVITIES
 three months ended
June 30
six months ended
June 30
(millions of $)2021202020212020
Notes payable issued/(repaid), net247 (6,022)(2,460)(3,103)
Long-term debt issued, net of issue costs1,822 5,528 7,751 5,536 
Long-term debt repaid (1,170)(980)(2,241)
Junior subordinated notes issued, net of issue costs(1)— 495 — 
Loss on settlement of financial instruments (130) (130)
Redeemable non-controlling interest repurchased — (633)— 
Contributions from redeemable non-controlling interest 54  54 
Dividends and distributions paid(898)(860)(1,749)(1,660)
Common shares issued26 60 83 
Preferred shares redeemed(500)— (500)— 
Acquisition of TC PipeLines, LP transaction costs(10)— (15)— 
Net cash provided by/(used in) financing activities 686 (2,598)1,969 (1,461)
Long-term debt issued
On June 9, 2021, TCPL issued $750 million of Medium Term Notes due in June 2024 bearing interest at a floating rate, $500 million of Medium Term Notes due in June 2031 bearing interest at a fixed rate of 2.97 per cent, and $250 million of Medium Term Notes due in September 2047 bearing interest at a fixed rate of 4.33 per cent.
On January 4, 2021, we established a US$4.1 billion project-level credit facility to support the construction of the Keystone XL pipeline project, which was fully guaranteed by the Government of Alberta and non-recourse to us. The availability of this credit facility was subsequently reduced to US$1.6 billion, of which we drew US$849 million in total (US$230 million during the three months ended June 30, 2021), with full repayment by the Government of Alberta of the amount outstanding in June 2021. Refer to Note 5, Keystone XL, of our Condensed consolidated financial statements for additional information.
In December 2020, our subsidiary, Columbia Pipeline Group, Inc., entered into a US$4.2 billion Term Loan due in June 2022, bearing interest at a floating rate. In January 2021, US$4.0 billion was drawn on the Term Loan and the total availability under the loan agreement was reduced accordingly.
Long-term debt repaid/retired
In March 2021, our subsidiary, TC PipeLines, LP, redeemed US$350 million of Senior Unsecured Notes bearing interest at a fixed rate of 4.65 per cent.
In January 2021, TCPL repaid US$400 million of Debentures bearing interest at a fixed rate of 9.875 per cent.
In June 2021, the Government of Alberta repaid the US$849 million ($1.0 billion) outstanding balance under the Keystone XL project-level credit facility, with no cash impact to us, and the facility was subsequently terminated. Refer to Note 5, Keystone XL, of our Condensed consolidated financial statements for additional information.
Junior subordinated notes issued
In March 2021, we issued $500 million of Junior Subordinated Notes through TransCanada Trust, a wholly-owned financing trust subsidiary of TCPL. We used the proceeds from the issuance to redeem all issued and outstanding TC Energy Series 13 preferred shares on May 31, 2021 pursuant to their terms. Refer to Note 9, Junior subordinated notes issued, of our Condensed consolidated financial statements for additional information.


TC Energy Second Quarter 2021 | 35



Redeemable non-controlling interest repurchased
On January 8, 2021, we exercised our call right in accordance with contractual terms and paid US$497 million to repurchase the Government of Alberta Class A Interests which were classified as Current liabilities on the Consolidated balance sheet at December 31, 2020. This transaction was funded by draws on the Keystone XL project-level credit facility which was guaranteed by the Government of Alberta as discussed above.
DIVIDENDS
On July 28, 2021, we declared quarterly dividends on our common shares of $0.87 per share payable on October 29, 2021 to shareholders of record at the close of business on September 30, 2021.
SHARE INFORMATION
At July 23, 2021, we had 979 million issued and outstanding common shares and 9 million outstanding options to buy common shares, of which 6 million were exercisable.
On May 31, 2021, we redeemed all of the 20 million issued and outstanding Series 13 preferred shares at a redemption price of $25.00 per share and paid the final quarterly dividend of $0.34375 per Series 13 preferred share for the period up to but excluding May 31, 2021 as previously declared on May 6, 2021.
On March 3, 2021, we issued 37,955,093 TC Energy common shares to acquire all the outstanding common units of TC PipeLines, LP, valued at approximately $2.1 billion, net of transaction costs. Refer to the Recent developments – Corporate section for additional information on the acquisition.
On February 1, 2021, 818,876 Series 5 preferred shares were converted, on a one-for-one basis, into Series 6 preferred shares and 175,208 Series 6 preferred shares were converted, on a one-for-one basis, into Series 5 preferred shares.
CREDIT FACILITIES
On March 4, 2021, our subsidiary, TC PipeLines, LP, terminated a US$500 million unsecured revolving credit facility bearing interest at a floating rate on which no amount was outstanding.
Refer to the Financial risks and financial instruments section for more information about liquidity, market and other risks.
CONTRACTUAL OBLIGATIONS
Capital expenditure commitments at June 30, 2021 are largely consistent with December 31, 2020, reflecting the net effect of an approximate $0.9 billion reduction related to the termination of the Keystone XL pipeline project and an increase in new capital commitments primarily related to NGTL System expansion and ANR pipeline projects.
There were no other material changes to our contractual obligations in second quarter 2021 or to payments due in the next five years or after. Refer to our 2020 Annual Report for more information about our contractual obligations.
36 | TC Energy Second Quarter 2021



Financial risks and financial instruments
We are exposed to market risk and counterparty credit risk and have strategies, policies and limits in place to manage the impact of these risks on our earnings, cash flows and, ultimately, shareholder value.
Risk management strategies, policies and limits are designed to ensure our risks and related exposures are in line with our business objectives and risk tolerance.
Refer to our 2020 Annual Report for more information about the risks we face in our business which have not changed substantially since December 31, 2020, other than as noted within this MD&A. Refer to the Recent developments section of this MD&A for further information regarding the impact of COVID-19 on our financial risks.
INTEREST RATE RISK
We utilize both short- and long-term debt to finance our operations which exposes us to interest rate risk. We typically pay fixed rates of interest on our long-term debt and floating rates on short-term debt including our commercial paper programs and amounts drawn on our credit facilities. A small portion of our long-term debt bears interest at floating rates. In addition, we are exposed to interest rate risk on financial instruments and contractual obligations containing variable interest rate components. We actively manage our interest rate risk using interest rate derivatives.
Many of our financial instruments and contractual obligations with variable rate components reference U.S. dollar LIBOR, of which certain rate settings will cease to be published at the end of 2021 with full cessation by mid-2023. We continue to monitor developments and are addressing necessary system and contractual changes while assessing the adoption of the standard market proposed reference rates. This includes testing system solutions and analyzing existing agreements to determine the effect of reference rate reform on our consolidated financial statements.
FOREIGN EXCHANGE RISK
Certain of our businesses generate all or most of their earnings in U.S. dollars and, since we report our financial results in Canadian dollars, changes in the value of the U.S. dollar against the Canadian dollar can affect our comparable EBITDA and net income. Refer to the Consolidated results – Foreign exchange section for additional information.
A small portion of our Mexico Natural Gas Pipelines monetary assets and liabilities are peso-denominated, while the functional currency for our Mexico operations is U.S. dollars. These peso-denominated balances are revalued to U.S. dollars and, as a result, changes in the value of the Mexican peso against the U.S. dollar can affect our net income. This exposure is managed using foreign exchange derivatives.
Net investment hedges
We hedge a portion of our net investment in foreign operations, on an after-tax basis, with U.S. dollar-denominated debt, cross-currency swaps, foreign exchange forwards and foreign exchange options as appropriate.
COUNTERPARTY CREDIT RISK
We have exposure to counterparty credit risk in a number of areas including:
cash and cash equivalents
accounts receivable and certain contractual recoveries
available-for-sale assets
fair value of derivative assets
loans receivable.
TC Energy Second Quarter 2021 | 37



While the majority of our credit exposure is to large creditworthy entities, we maintain close monitoring and communication with those counterparties experiencing greater financial pressures due to significant market events. Although the effects of the COVID-19 pandemic and other market disruptions on our customers are difficult to predict, similar to 2020, we are not expecting a material negative impact to our 2021 earnings or cash flows. Refer to our 2020 Annual Report for more information about the factors that mitigate our counterparty credit risk exposure.
We review financial assets carried at amortized cost for impairment using the lifetime expected loss of the financial asset at initial recognition and throughout the life of the financial asset. We use historical credit loss and recovery data, adjusted for our judgment regarding current economic and credit conditions, along with supportable forecasts to determine any impairment, which is recognized in Plant operating costs and other. At June 30, 2021, we had no significant credit losses, no significant credit risk concentration and no significant amounts past due or impaired.
We have significant credit and performance exposure to financial institutions because they hold cash deposits and provide committed credit lines and letters of credit that help manage our exposure to counterparties and provide liquidity in commodity, foreign exchange and interest rate derivative markets.
LIQUIDITY RISK
Liquidity risk is the risk that we will not be able to meet our financial obligations as they come due. We manage our liquidity risk by continuously forecasting our cash flows and ensuring we have adequate cash balances, cash flows from operations, committed and demand credit facilities and access to capital markets to meet our operating, financing and capital expenditure obligations under both normal and stressed economic conditions.
RELATED PARTY TRANSACTIONS
Loans Receivable from Affiliates
Related party transactions are conducted in the normal course of business and are measured at the exchange amount, which is the amount of consideration established and agreed to by the related parties.
Sur de Texas
At June 30, 2021 and December 31, 2020, the Loan receivable from affiliate on our Condensed consolidated balance sheet of MXN$20.9 billion or $1.3 billion, represented our 60 per cent proportionate share of long-term debt financing to the Sur de Texas joint venture. Our Condensed consolidated statement of income reflects the related interest income and foreign exchange impact on this loan receivable which were fully offset upon consolidation with corresponding amounts included in our 60 per cent proportionate share of Sur de Texas equity earnings as follows:
three months ended
June 30
six months ended
June 30
Affected line item in the Condensed consolidated statement of income
(millions of $)2021202020212020
Interest income1
21 29 42 62 Interest income and other
Interest expense2
(21)(29)(42)(62)Income from equity investments
Foreign exchange gains/(losses)1
32 26 (3)(277)Interest income and other
Foreign exchange (losses)/gains1
(32)(26)3 277 Income from equity investments
1Included in our Corporate segment.
2Included in our Mexico Natural Gas Pipelines segment.
Coastal GasLink Pipeline Limited Partnership
We hold a 35 per cent equity interest in Coastal GasLink LP which has contracted us to construct and operate the Coastal GasLink pipeline. In 2020, we entered into a subordinated demand revolving credit facility with Coastal GasLink LP to provide additional short-term liquidity and funding flexibility to the project. The facility bears interest at a floating market-based rate and had a capacity of $500 million at June 30, 2021 with an outstanding balance of $220 million (December 31, 2020 – nil) reflected in Other current assets on our Condensed consolidated balance sheet.
38 | TC Energy Second Quarter 2021



FINANCIAL INSTRUMENTS
With the exception of Long-term debt and Junior subordinated notes, our derivative and non-derivative financial
instruments are recorded on the balance sheet at fair value unless they were entered into and continue to be held for
the purpose of receipt or delivery in accordance with our normal purchase and sales exemptions and are documented as such. In addition, fair value accounting is not required for other financial instruments that qualify for certain accounting exemptions.
Derivative instruments
We use derivative instruments to reduce volatility associated with fluctuations in commodity prices, interest rates and foreign exchange rates. Derivative instruments, including those that qualify and are designated for hedge accounting treatment, are recorded at fair value. 
The majority of derivative instruments that are not designated or do not qualify for hedge accounting treatment have been entered into as economic hedges to manage our exposure to market risk and are classified as held for trading. Changes in the fair value of held-for-trading derivative instruments are recorded in net income in the period of change. This may expose us to increased variability in reported operating results since the fair value of the held-for-trading derivative instruments can fluctuate significantly from period to period.
The recognition of gains and losses on derivatives for Canadian natural gas regulated pipeline exposures is determined through the regulatory process. Gains and losses arising from changes in the fair value of derivatives accounted for as part of RRA, including those that qualify for hedge accounting treatment, are expected to be recovered or refunded through the tolls charged by us. As a result, these gains and losses are deferred as regulatory assets or regulatory liabilities and are refunded to or collected from the ratepayers in subsequent years when the derivative settles.
Balance sheet presentation of derivative instruments
The balance sheet presentation of the fair value of derivative instruments is as follows:
(millions of $)June 30, 2021December 31, 2020
Other current assets252 235 
Other long-term assets64 41 
Accounts payable and other(138)(72)
Other long-term liabilities(52)(59)
126 145 
TC Energy Second Quarter 2021 | 39



Unrealized and realized (losses)/gains on derivative instruments
The following summary does not include hedges of our net investment in foreign operations:
three months ended
June 30
six months ended
June 30
(millions of $)2021202020212020
Derivative Instruments Held for Trading1
Amount of unrealized (losses)/gains in the period
Commodities(15)(50)16 16 
Foreign exchange(63)170 (58)(102)
Amount of realized gains/(losses) in the period
Commodities48 42 109 78 
Foreign exchange117 (39)158 (51)
Derivative Instruments in Hedging Relationships2
Amount of realized (losses)/gains in the period
Commodities(12)(23)
Interest rate(6)(5)(12)(4)
1Realized and unrealized gains and losses on held-for-trading derivative instruments used to purchase and sell commodities are included on a net basis in Revenues. Realized and unrealized gains and losses on foreign exchange held-for-trading derivative instruments are included on a net basis in Interest income and other.
2There were no gains or losses included in Net income/(loss) relating to discontinued cash flow hedges where it was probable that the anticipated transaction would not occur.
For further details on our non-derivative and derivative financial instruments, including classification assumptions made in the calculation of fair value and additional discussion of exposure to risks and mitigation activities, refer to Note 14, Risk management and financial instruments, of our Condensed consolidated financial statements.
40 | TC Energy Second Quarter 2021



Other information
CONTROLS AND PROCEDURES
Management, including our President and CEO and our CFO, evaluated the effectiveness of our disclosure controls and procedures as at June 30, 2021, as required by the Canadian securities regulatory authorities and by the SEC, and concluded that our disclosure controls and procedures are effective at a reasonable assurance level.
There were no changes in second quarter 2021 that had or are likely to have a material impact on our internal control over financial reporting.
CRITICAL ACCOUNTING ESTIMATES AND ACCOUNTING POLICY CHANGES
When we prepare financial statements that conform with U.S. GAAP, we are required to make estimates and assumptions that affect the timing and amounts we record for our assets, liabilities, revenues and expenses because these items may be affected by future events. We base the estimates and assumptions on the most current information available, using our best judgment. We also regularly assess the assets and liabilities themselves. A summary of our critical accounting estimates is included in our 2020 Annual Report.
Accounting Changes
Our significant accounting policies have remained unchanged since December 31, 2020 other than as described in Note 2, Accounting changes, of our Condensed consolidated financial statements. A summary of our significant accounting policies is included in our 2020 Annual Report.
TC Energy Second Quarter 2021 | 41



Quarterly results
SELECTED QUARTERLY CONSOLIDATED FINANCIAL DATA
 202120202019
(millions of $, except per share amounts)SecondFirstFourthThirdSecondFirstFourthThird
Revenues3,182 3,381 3,297 3,195 3,089 3,418 3,263 3,133 
Net income/(loss) attributable to common shares982 (1,057)1,124 904 1,281 1,148 1,108 739 
Comparable earnings1,045 1,108 1,080 893 863 1,109 970 970 
Per share statistics:
Net income/(loss) per common share – basic $1.00 ($1.11)$1.20 $0.96 $1.36 $1.22 $1.18 $0.79 
Comparable earnings per common share$1.07 $1.16 $1.15 $0.95 $0.92 $1.18 $1.03 $1.04 
Dividends declared per common share$0.87 $0.87 $0.81 $0.81 $0.81 $0.81 $0.75 $0.75 
FACTORS AFFECTING QUARTERLY FINANCIAL INFORMATION BY BUSINESS SEGMENT
Quarter-over-quarter revenues and net income fluctuate for reasons that vary across our business segments.
In our Canadian Natural Gas Pipelines, U.S. Natural Gas Pipelines and Mexico Natural Gas Pipelines segments, except for seasonal fluctuations in short-term throughput volumes on U.S. pipelines, quarter-over-quarter revenues and segmented earnings generally remain relatively stable during any fiscal year. Over the long term, however, they fluctuate because of:
regulatory decisions
negotiated settlements with shippers
newly constructed assets being placed in service
acquisitions and divestitures
developments outside of the normal course of operations.
In Liquids Pipelines, annual revenues and segmented earnings are based on contracted and uncontracted spot transportation, as well as liquids marketing activities. Quarter-over-quarter revenues and segmented earnings are affected by:
regulatory decisions
newly constructed assets being placed in service
acquisitions and divestitures
demand for uncontracted transportation services
liquids marketing activities and commodity prices
developments outside of the normal course of operations
certain fair value adjustments.
In Power and Storage, quarter-over-quarter revenues and segmented earnings are affected by:
weather
customer demand
newly constructed assets being placed in service
acquisitions and divestitures
market prices for natural gas and power
capacity prices and payments
planned and unplanned plant outages
developments outside of the normal course of operations
certain fair value adjustments.
42 | TC Energy Second Quarter 2021



FACTORS AFFECTING FINANCIAL INFORMATION BY QUARTER
We calculate comparable measures by adjusting certain GAAP and non-GAAP measures for specific items we believe are significant but not reflective of our underlying operations in the period.
Comparable earnings exclude the unrealized gains and losses from changes in the fair value of certain derivatives used to reduce our exposure to specific financial and commodity price risks. These derivatives generally provide effective economic hedges but do not meet the criteria for hedge accounting. As a result, the changes in fair value are recorded in net income. As these amounts do not accurately reflect the gains and losses that will be realized at settlement, we do not consider them part of our underlying operations. We also exclude the unrealized foreign exchange gains and losses on the Loan receivable from affiliate as well as the corresponding proportionate share of Sur de Texas foreign exchange gains and losses, as these amounts do not accurately reflect the gains and losses that will be realized at settlement. These amounts offset within each reporting period, resulting in no impact on net income.
In second quarter 2021, comparable earnings also excluded:
an incremental $2 million after-tax asset impairment charge, net of expected contractual recoveries and other contractual and legal obligations, related to the termination of the Keystone XL pipeline project
preservation and other costs of $16 million after tax primarily related to the preservation and storage of Keystone XL pipeline project assets, which could not be accrued as part of the Keystone XL impairment charge, and interest expense on the Keystone XL project-level credit facility prior to its termination
a $13 million after-tax recovery of certain costs from the IESO associated with the Ontario natural gas-fired power plants sold in 2020.
In first quarter 2021, comparable earnings also excluded:
an after-tax asset impairment charge, net of expected contractual recoveries and other contractual and legal obligations, of $2.2 billion related to the formal suspension of the Keystone XL pipeline project following the January 20, 2021 revocation of the Presidential Permit.
In fourth quarter 2020, comparable earnings also excluded:
an income tax valuation allowance release of $18 million related to certain prior years' U.S. income tax losses resulting from our reassessment of deferred income tax assets that are more likely than not to be realized
an additional $18 million income tax recovery related to state income taxes on the sale of certain Columbia Midstream assets in 2019
an incremental after-tax loss of $81 million for the three months ended December 31, 2020 related to the sale of our Ontario natural gas-fired power plants.
In third quarter 2020, comparable earnings also excluded:
an incremental after-tax loss of $45 million related to the sale of the Ontario natural gas-fired power plants
a $6 million reduction in the after-tax gain related to the sale of a 65 per cent equity interest in Coastal GasLink LP.
In second quarter 2020, comparable earnings also excluded:
an after-tax gain of $408 million related to the sale of a 65 per cent equity interest in Coastal GasLink LP
an incremental after-tax loss of $80 million related to the sale of the Ontario natural gas-fired power plants.
In first quarter 2020, comparable earnings also excluded:
an income tax valuation allowance release of $281 million following our reassessment of deferred income tax assets that are deemed more likely than not to be realized
an incremental after-tax loss of $77 million related to the Ontario natural gas-fired power plant assets held for sale.
TC Energy Second Quarter 2021 | 43



In fourth quarter 2019, comparable earnings also excluded:
an income tax valuation allowance release of $195 million related to certain prior years' U.S. income tax losses resulting from our reassessment of deferred income tax assets that are more likely than not to be realized
an incremental after-tax loss of $61 million related to the Ontario natural gas-fired power plant assets held for sale
an additional $19 million expense related to state income taxes on the sale of certain Columbia Midstream assets.
In third quarter 2019, comparable earnings also excluded:
an after-tax loss of $133 million related to the Ontario natural gas-fired power plant assets held for sale
an after-tax loss of $133 million related to the sale of certain Columbia Midstream assets
an after-tax gain of $115 million related to the partial sale of Northern Courier.





44 | TC Energy Second Quarter 2021