<?xml version="1.0" encoding="us-ascii"?><InstanceReport xmlns:xsd="http://www.w3.org/2001/XMLSchema" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><Version>2.4.0.8</Version><ReportLongName>0018 - Disclosure - 11. Fair Value - Asset Retirement Obligation</ReportLongName><DisplayLabelColumn>true</DisplayLabelColumn><ShowElementNames>false</ShowElementNames><RoundingOption /><HasEmbeddedReports>false</HasEmbeddedReports><Columns><Column FlagID="0"><Id>1</Id><IsAbstractGroupTitle>false</IsAbstractGroupTitle><LabelSeparator>

</LabelSeparator><CurrencyCode /><FootnoteIndexer /><hasSegments>false</hasSegments><hasScenarios>false</hasScenarios><MCU><KeyName /><CurrencySymbol /><contextRef><ContextID>From2012-07-01to2013-06-30</ContextID><EntitySchema>http://www.sec.gov/CIK</EntitySchema><EntityValue>0000098618</EntityValue><PeriodDisplayName /><PeriodType>duration</PeriodType><PeriodStartDate>2012-07-01T00:00:00</PeriodStartDate><PeriodEndDate>2013-06-30T00:00:00</PeriodEndDate><Segments /><Scenarios /></contextRef><UPS /><CurrencyCode /><OriginalCurrencyCode /></MCU><CurrencySymbol /><Labels><Label Key="CalendarSupplement" Id="0" Label="12 Months Ended" /><Label Key="Calendar" Id="1" Label="Jun. 30, 2013" /></Labels></Column></Columns><Rows><Row FlagID="0"><Id>1</Id><IsAbstractGroupTitle>true</IsAbstractGroupTitle><LabelSeparator>

</LabelSeparator><Level>1</Level><ElementName>us-gaap_AccountingPoliciesAbstract</ElementName><ElementPrefix>us-gaap_</ElementPrefix><IsBaseElement>true</IsBaseElement><BalanceType>na</BalanceType><PeriodType>duration</PeriodType><IsReportTitle>false</IsReportTitle><IsSegmentTitle>false</IsSegmentTitle><IsCalendarTitle>false</IsCalendarTitle><IsEquityPrevioslyReportedAsRow>false</IsEquityPrevioslyReportedAsRow><IsEquityAdjustmentRow>false</IsEquityAdjustmentRow><IsBeginningBalance>false</IsBeginningBalance><IsEndingBalance>false</IsEndingBalance><IsReverseSign>false</IsReverseSign><FootnoteIndexer /><Cells><Cell FlagID="0" ContextID="" UnitID=""><Id>1</Id><IsNumeric>false</IsNumeric><IsRatio>false</IsRatio><DisplayZeroAsNone>false</DisplayZeroAsNone><NumericAmount>0</NumericAmount><RoundedNumericAmount>0</RoundedNumericAmount><NonNumbericText /><FootnoteIndexer /><CurrencyCode /><CurrencySymbol /><IsIndependantCurrency>false</IsIndependantCurrency><ShowCurrencySymbol>false</ShowCurrencySymbol><DisplayDateInUSFormat>false</DisplayDateInUSFormat></Cell></Cells><ElementDataType>xbrli:stringItemType</ElementDataType><SimpleDataType>string</SimpleDataType><IsTotalLabel>false</IsTotalLabel><UnitID>0</UnitID><Label>Accounting Policies [Abstract]</Label></Row><Row FlagID="0"><Id>2</Id><IsAbstractGroupTitle>false</IsAbstractGroupTitle><LabelSeparator>

</LabelSeparator><Level>2</Level><ElementName>us-gaap_AssetRetirementObligationsAndEnvironmentalCostPolicyTextBlock</ElementName><ElementPrefix>us-gaap_</ElementPrefix><IsBaseElement>true</IsBaseElement><BalanceType>na</BalanceType><PeriodType>duration</PeriodType><IsReportTitle>false</IsReportTitle><IsSegmentTitle>false</IsSegmentTitle><IsCalendarTitle>false</IsCalendarTitle><IsEquityPrevioslyReportedAsRow>false</IsEquityPrevioslyReportedAsRow><IsEquityAdjustmentRow>false</IsEquityAdjustmentRow><IsBeginningBalance>false</IsBeginningBalance><IsEndingBalance>false</IsEndingBalance><IsReverseSign>false</IsReverseSign><FootnoteIndexer /><Cells><Cell FlagID="0" ContextID="From2012-07-01to2013-06-30" UnitID=""><Id>1</Id><IsNumeric>false</IsNumeric><IsRatio>false</IsRatio><DisplayZeroAsNone>false</DisplayZeroAsNone><NumericAmount>0</NumericAmount><RoundedNumericAmount>0</RoundedNumericAmount><NonNumbericText>&lt;p style="font: 8pt/normal Times New Roman, Times, Serif; margin: 0 0 0 27pt; text-align: justify; text-indent: 0in"&gt;The Company
has recognized estimated asset retirement obligations (closure cost) at June 30, 2012 of $410,000 to remove leasehold improvements,
remediate any pollution issues and return the Deer Creek water disposal property to its natural state at the conclusion of the
Company&amp;#146;s lease. The closure process is a requirement of both the Deer Creek lease and the State of Colorado, a permitting
authority for such facilities. The closure cost estimate, in current dollars, was completed by an approved independent consultant
experienced in estimating closure costs for water disposal operations and the estimated amount was, subsequent to June 30, 2012,
approved by the State of Colorado. A present value discount has not been taken as the estimated closure costs, excluding regulatory
changes and inflation adjustments, are anticipated to remain fairly consistent over the operational life of the facility.&lt;/p&gt;

&lt;p style="font: 8pt/normal Times New Roman, Times, Serif; margin: 0 0 0 45.35pt; text-align: justify; text-indent: -0.25in"&gt;&amp;#160;&lt;/p&gt;

&lt;p style="font: 8pt/normal Times New Roman, Times, Serif; margin: 0 0 0 27pt; text-align: justify; text-indent: 0in"&gt;The Company
reviews the contingent asset retirement obligation on a recurring basis and records changes in the period incurred. At June 30,
2013, the estimated closure costs were again reviewed and the only adjustment was a 1.8% inflation adjustment as required under
agreement with the Colorado Department of Public Health and Environment, increasing the asset retirement obligation to $417,400,
AES&amp;#146;s approximate 75% share of the $566,000 estimated closure costs for both the Deer Creek facility and the adjacent Goodwin
Solid Waste facility (Goodwin is not owned by AES). The significant unobservable inputs used in the fair value measurement of the
Company&amp;#146;s fair value calculation for the asset retirement obligation include the estimated cost to close the Deer Creek facility
in accordance with state approved closure plans, the projected timing of the closure and the discount rate applied. Significant
changes in any of those inputs in isolation would result in a significantly different fair value measurement. See Note 5 &amp;#150;
Alanco Energy Services for additional discussion on AES operations.&lt;/p&gt;

&lt;p style="font: 8pt/normal Times New Roman, Times, Serif; margin: 0 0 0 27pt; text-align: justify; text-indent: 0in"&gt;&amp;#160;&lt;/p&gt;

&lt;p style="font: 8pt Times New Roman, Times, Serif; margin: 0; text-align: justify"&gt;&lt;/p&gt;

&lt;p style="font: 8pt/normal Times New Roman, Times, Serif; margin: 0 0 0 27pt; text-align: justify; text-indent: 0in"&gt;The laws of
the State of Colorado require companies to meet environmental and asset retirement obligations by selecting an approved payment
method. The Company has elected to meet its obligation by making an initial payment of approximately $25,300 and quarterly payments
of approximately $4,700 into a trust that over the expected lease period will build liquid assets to meet the asset retirement
obligation.&lt;/p&gt;</NonNumbericText><FootnoteIndexer /><CurrencyCode /><CurrencySymbol /><IsIndependantCurrency>false</IsIndependantCurrency><ShowCurrencySymbol>false</ShowCurrencySymbol><DisplayDateInUSFormat>false</DisplayDateInUSFormat></Cell></Cells><ElementDataType>nonnum:textBlockItemType</ElementDataType><SimpleDataType>na</SimpleDataType><ElementDefenition>Disclosure of accounting policy for (1) legal obligations associated with the disposal or removal of a long-lived asset from service that result from the acquisition, construction, or development or from the normal operation of a long-lived asset (except obligations of a lessee in connection with leased property that are minimum lease payments or contingent rentals, or obligations that arise solely from a plan to sell or otherwise dispose of a long-lived asset); and (2) certain environmental remediation liabilities that resulted from the improper or other-than-normal operation of a long-lived asset. This accounting policy may address (1) whether the related remediation costs are expensed or capitalized, (2) whether the obligation is measured on a discounted basis, (3) the event, situation, or set of circumstances that generally triggers recognition of loss contingencies arising from the entity's environmental remediation-related obligations, and (4) the timing of recognition of any recoveries.</ElementDefenition><ElementReferences>Reference 1: http://www.xbrl.org/2003/role/presentationRef

 -Publisher FASB

 -Name Accounting Standards Codification

 -Topic 235

 -SubTopic 10

 -Section 50

 -Paragraph 3

 -URI http://asc.fasb.org/extlink&amp;oid=6367646&amp;loc=d3e18780-107790



Reference 2: http://www.xbrl.org/2003/role/presentationRef

 -Publisher FASB

 -Name Accounting Standards Codification

 -Topic 410

 -SubTopic 20

 -URI http://asc.fasb.org/subtopic&amp;trid=2175671



Reference 3: http://www.xbrl.org/2003/role/presentationRef

 -Publisher FASB

 -Name Accounting Standards Codification

 -Topic 410

 -SubTopic 30

 -Section 50

 -Paragraph 8

 -URI http://asc.fasb.org/extlink&amp;oid=6393242&amp;loc=d3e13231-110859



Reference 4: http://www.xbrl.org/2003/role/presentationRef

 -Publisher FASB

 -Name Accounting Standards Codification

 -Topic 410

 -SubTopic 30

 -URI http://asc.fasb.org/subtopic&amp;trid=2175709



Reference 5: http://www.xbrl.org/2003/role/presentationRef

 -Publisher FASB

 -Name Accounting Standards Codification

 -Topic 410

 -SubTopic 30

 -Section 55

 -Paragraph 14

 -URI http://asc.fasb.org/extlink&amp;oid=6571209&amp;loc=d3e13669-110860



</ElementReferences><IsTotalLabel>false</IsTotalLabel><UnitID>0</UnitID><Label>FAIR VALUE - ASSET RETIRMENT OBLIGATIONS</Label></Row></Rows><Footnotes /><IsEquityReport>false</IsEquityReport><ReportName>11. Fair Value - Asset Retirement Obligation</ReportName><MonetaryRoundingLevel>UnKnown</MonetaryRoundingLevel><SharesRoundingLevel>UnKnown</SharesRoundingLevel><PerShareRoundingLevel>UnKnown</PerShareRoundingLevel><ExchangeRateRoundingLevel>UnKnown</ExchangeRateRoundingLevel><HasCustomUnits>true</HasCustomUnits><IsEmbedReport>false</IsEmbedReport><IsMultiCurrency>false</IsMultiCurrency><ReportType>Sheet</ReportType><RoleURI>http://alanco.com/role/FairValue-AssetRetirementObligation</RoleURI><NumberOfCols>1</NumberOfCols><NumberOfRows>2</NumberOfRows></InstanceReport>
