TEC had two operating segments as of December 31, 2022 and for the year then ended. Its Tampa Electric division provides retail electric services in West Central Florida, and PGS, its natural gas division, is engaged in the purchase, distribution and sale of natural gas for residential, commercial, industrial and electric power generation customers in Florida. See "Separation of PGS from TEC" below for information regarding the separation that occurred on January 1, 2023. TEC’s significant accounting policies are as follows:

Principles of Consolidation and Basis of Presentation

TEC maintains its accounts in accordance with recognized policies prescribed or permitted by the FPSC and the FERC. These policies conform with U.S. GAAP in all material respects. The use of estimates is inherent in the preparation of financial statements in accordance with U.S. GAAP. Actual results could differ from these estimates.

TEC is a wholly owned subsidiary of TECO Energy, Inc. and contains electric and natural gas divisions. Intercompany balances and transactions within the divisions have been eliminated in consolidation. TECO Energy is a wholly owned indirect subsidiary of Emera. Therefore, TEC is an indirect, wholly owned subsidiary of Emera.

Cash Equivalents

Cash equivalents are highly liquid, high-quality investments purchased with an original maturity of three months or less. The carrying amount of cash equivalents approximated fair market value because of the short maturity of these instruments.

Property, Plant and Equipment

 

Property, plant and equipment is stated at original cost, which includes labor, material, applicable taxes, overhead and AFUDC. Concurrent with a planned major maintenance outage or with new construction, the cost of adding or replacing retirement units-of-property is capitalized in conformity with the regulations of FERC and FPSC. The cost of maintenance, repairs and replacement of minor items of property is expensed as incurred.

As regulated utilities, Tampa Electric and PGS must file depreciation and dismantlement studies periodically and receive approval from the FPSC before implementing new depreciation rates. Included in approved depreciation rates is either an implicit net salvage factor or a cost of removal factor, expressed as a percentage. The net salvage factor is principally comprised of two components—a salvage factor and a cost of removal or dismantlement factor. TEC uses current cost of removal or dismantlement factors as part of the estimation method to approximate the amount of cost of removal in accumulated depreciation. The original cost of utility plant retired or otherwise disposed of and the cost of removal or dismantlement, less salvage value, is charged to accumulated depreciation and the accumulated cost of removal reserve reported as a regulatory liability, respectively.

For other property dispositions, the cost and accumulated depreciation are removed from the balance sheet and a gain or loss is recognized.

Property, plant and equipment consisted of the following assets:

 

(millions)

 

Estimated Useful Lives

 

December 31, 2022

 

 

December 31, 2021

 

Electric generation

 

21-60 years

 

$

6,300

 

 

$

5,395

 

Electric transmission

 

10-77 years

 

 

1,109

 

 

 

1,068

 

Electric distribution

 

10-59 years

 

 

3,296

 

 

 

3,064

 

Gas transmission and distribution

 

15-75 years

 

 

2,567

 

 

 

2,360

 

General plant and other

 

3-71 years

 

 

1,020

 

 

 

946

 

Total cost

 

 

 

 

14,292

 

 

 

12,833

 

Less Tampa Electric accumulated depreciation

 

 

 

 

(3,158

)

 

 

(2,937

)

Less PGS accumulated depreciation

 

 

 

 

(687

)

 

 

(664

)

Tampa Electric construction work in progress

 

 

 

 

949

 

 

 

1,219

 

PGS construction work in progress

 

 

 

 

248

 

 

 

151

 

Total property, plant and equipment, net

 

 

 

$

11,644

 

 

$

10,602

 

 

Depreciation

The provision for total regulated utility plant in service, expressed as a percentage of the original cost of depreciable property, was 3.2%, 3.5% and 3.2% for 2022, 2021 and 2020, respectively. Construction work in progress is not depreciated until the asset is placed in service. TEC's total depreciation expense for the years ended December 31, 2022, 2021 and 2020 was $402 million, $408 million and $381 million, respectively. For the year ended December 31, 2022, 2021 and 2020, Tampa Electric's depreciation expense was $359 million, $357 million and $339 million, respectively.

 

Tampa Electric and PGS compute depreciation and amortization using the following methods:

the group remaining life method, approved by the FPSC, is applied to the average investment, adjusted for anticipated costs of removal less salvage, in functional classes of depreciable property;
the amortizable life method, approved by the FPSC, is applied to the net book value to date over the remaining life of those assets not classified as depreciable property above.

Allowance for Funds Used During Construction

AFUDC is a non-cash credit to income with a corresponding charge to utility plant which represents the cost of borrowed funds and a reasonable return on other funds used for construction. The rates used to calculate AFUDC are revised periodically to reflect significant changes in cost of capital. In 2022, 2021 and 2020, Tampa Electric’s rate was 6.00%, 6.46% and 6.46%, respectively. PGS’s rate used to calculate its AFUDC in 2022, 2021 and 2020 was 6.00%, 6.00% and 5.97%, respectively. Total AFUDC for the years ended December 31, 2022, 2021 and 2020 was $46 million, $66 million and $44 million, respectively.

Inventory

TEC values materials, supplies and fossil fuel inventory (natural gas and coal) using a weighted-average cost method. These materials, supplies and fuel inventories are carried at the lower of weighted-average cost or net realizable value.

Regulatory Assets and Liabilities

Tampa Electric and PGS are subject to accounting guidance for the effects of certain types of regulation (see Note 3).

Deferred Income Taxes

TEC uses the asset and liability method in the measurement of deferred income taxes. Under the asset and liability method, the temporary differences between the financial statement and tax bases of assets and liabilities are reported as deferred taxes measured at enacted tax rates. Tampa Electric and PGS are regulated, and their books and records reflect approved regulatory treatment, including certain adjustments to accumulated deferred income taxes and the establishment of a corresponding regulatory tax liability reflecting the amount payable to customers through future rates. See Note 4 for additional details.

Investment Tax Credits

ITCs have been recorded as deferred credits and are being amortized as reductions to income tax expense over the service lives of the related property.

 

Stranded Tax Effects in Accumulated Other Comprehensive Income

TEC utilizes a portfolio approach to determine the timing and extent to which stranded income tax effects from items that were previously recorded in accumulated other comprehensive income are released.

Revenue Recognition

Regulated electric revenue

Electric revenues, including energy charges, demand charges, basic facilities charges and applicable clauses and riders, are recognized when obligations under the terms of a contract are satisfied. This occurs primarily when electricity is delivered to customers over time as the customer simultaneously receives and consumes the benefits of the electricity. Electric revenues are recognized on an accrual basis and include billed and unbilled revenues. Revenues related to the sale of electricity are recognized at rates approved by the respective regulator and recorded based on metered usage, which occur on a periodic, systematic basis, generally monthly. At the end of each reporting period, the electricity delivered to customers, but not billed, is estimated and the corresponding unbilled revenue is recognized. Tampa Electric’s estimate of unbilled revenue at the end of the reporting period is calculated by estimating the number of MWH delivered to customers at the established rate expected to prevail in the upcoming billing cycle. This estimate includes assumptions as to the pattern of energy demand, timing of meter reads and line losses.

Regulated gas revenue

Gas revenues, including energy charges, demand charges, basic facilities charges and applicable clauses and riders, are recognized when obligations under the terms of a contract are satisfied. This occurs primarily when gas is delivered to customers over time as the customer simultaneously receives and consumes the benefits of the gas. Gas revenues are recognized on an accrual basis and include billed and unbilled revenues. Revenues related to the distribution and sale of gas are recognized at rates approved by the regulator and recorded based on metered usage, which occur on a periodic, systematic basis, generally monthly. At the end of each reporting period, the gas delivered to customers, but not billed, is estimated and the corresponding unbilled revenue is recognized. PGS’s estimate of unbilled revenue at the end of the reporting period is calculated by estimating the number of therms delivered to customers at the established rate expected to prevail in the upcoming billing cycle. This estimate includes assumptions as to the pattern of usage, weather, and inter-period changes to customer classes.

Other

See Accounting for Franchise Fees and Gross Receipts below for the accounting for gross receipts taxes. Sales and other taxes TEC collects concurrent with revenue-producing activities are excluded from revenue.

Revenues and Cost Recovery

Revenues include amounts resulting from cost-recovery clauses which provide for monthly billing charges to reflect increases or decreases in fuel, purchased power, conservation, environmental and storm protection plan costs for Tampa Electric and purchased gas, interstate pipeline capacity, replacement of cast iron/bare steel pipe and conservation costs for PGS. These adjustment factors are based on costs incurred and projected for a specific recovery period. Any over- or under-recovery of costs plus an interest factor are taken into account in the process of setting adjustment factors for subsequent recovery periods. Over-recoveries of costs are recorded as regulatory liabilities, and under-recoveries of costs are recorded as regulatory assets.

Certain other costs incurred by the regulated utilities are allowed to be recovered from customers through prices approved in the regulatory process. These costs are recognized as the associated revenues are recognized.

Receivables and Allowance for Credit Losses

Receivables from contracts with customers, which consist of services to residential, commercial, industrial and other customers, were $295 million and $252 million as of December 31, 2022 and 2021, respectively. An allowance for credit losses is established based on TEC’s collection experience and reasonable and supportable forecasts that affect the collectibility of the reported amount. Circumstances that impact Tampa Electric’s and PGS’s estimates of credit losses include, but are not limited to, customer credit issues, fuel prices, customer deposits and general economic conditions. Accounts are reserved in the allowance or written off once they are deemed to be uncollectible.

The regulated utilities accrue base revenues for services rendered but unbilled to provide for matching of revenues and expenses (see Note 3). As of December 31, 2022 and 2021, unbilled revenues of $82 million and $74 million, respectively, are included in the “Receivables” line item on TEC’s Consolidated Balance Sheets.

Accounting for Franchise Fees and Gross Receipts Taxes

Tampa Electric and PGS are allowed to recover certain costs incurred on a dollar-for-dollar basis from customers through rates approved by the FPSC. The amounts included in customers’ bills for franchise fees and gross receipt taxes are included as revenues on the Consolidated Statements of Income. Franchise fees and gross receipt taxes payable by Tampa Electric and PGS are included as an expense on the Consolidated Statements of Income in “Taxes, other than income”. These amounts totaled $145 million, $129 million and $109 million for the years ended December 31, 2022, 2021 and 2020, respectively.

 

Deferred Charges and Other Assets

Deferred charges and other assets consist primarily of pension assets net of accrued pension liabilities (see Note 5), right-of-use assets related to operating leases (see Note 13) and a contribution made by TEC in order to fully fund its SERP obligation (see Note 5).

 

Deferred Credits and Other Liabilities

Other deferred credits primarily include accrued other postretirement benefits (see Note 5), MGP environmental remediation liability (see Note 8), asset retirement obligations (see Note 12), lease liabilities (see Note 13) and a reserve for auto, general and workers’ compensation liability claims.

TECO Energy and its subsidiaries, including TEC, have a self-insurance program supplemented by excess insurance coverage for the cost of claims whose ultimate value exceeds the company’s retention amounts. TEC estimates its liabilities for auto, general and workers’ compensation using discount rates mandated by statute or otherwise deemed appropriate for the circumstances. Discount rates used in estimating these other self-insurance liabilities at December 31, 2022 and 2021 ranged from 4.00% to 5.78% and 1.63% to 4.00%, respectively.

Derivatives and Hedging Activities

On November 6, 2017, the FPSC approved an amended and restated settlement agreement filed by Tampa Electric, which included a provision for a moratorium on hedging of natural gas purchases ending on December 31, 2022. On October 21, 2021, the FPSC approved a settlement agreement filed by Tampa Electric related to its 2021 rate case that extended the moratorium to December 31, 2024 (see Note 3 for further information on the settlement agreements). TEC was hedging its exposure to the variability in future cash flows until November 30, 2018 for financial natural gas contracts. TEC had $5 million and zero derivative assets as of December 31, 2022 and 2021, respectively, and $1 million and zero derivative liabilities as of December 31, 2022 and December 31, 2021, respectively.

TEC’s physical contracts qualify for the NPNS exception to derivative accounting rules, provided they meet certain criteria. Generally, NPNS applies if TEC deems the counterparty creditworthy, if the counterparty owns or controls resources within the proximity to allow for physical delivery of the commodity, if TEC intends to receive physical delivery and if the transaction is reasonable in relation to TEC’s business needs. As of December 31, 2022 and 2021, all of TEC’s physical contracts qualified for the NPNS exception, which was elected.

TEC classifies cash inflows and outflows related to derivative and hedging instruments in the appropriate cash flow sections associated with the item being hedged. For natural gas, the cash inflows and outflows are included in the operating section of the Consolidated Statements of Cash Flows. For interest rate swaps that settle coincident with the debt issuance, the cash inflows and outflows are treated as premiums or discounts and included in the financing section of the Consolidated Statements of Cash Flows.

Separation of PGS from TEC

PGS became an operating division of TEC in 1997 when TECO Energy purchased PGS and merged that corporation into TEC. Since then, PGS has operated as a stand-alone regulated utility, including having its own tariff and its own books and records.

On January 1, 2023, TEC transferred the assets and liabilities of its PGS division into a separate corporation called Peoples Gas System, Inc. (PGSI) pursuant to a Contribution Agreement. This new corporation is a wholly owned subsidiary of a newly formed gas operations holding company, TECO Gas Operations, Inc., a wholly owned subsidiary of TECO Energy. On January 1, 2023, the assets, liabilities, and equity that had been recorded in the books of PGS were transferred from TEC to the newly formed PGSI at book value in a tax-free transaction. PGSI issued 100 shares of common stock to TEC related to the transfer of PGS, which were subsequently distributed to TECO Energy, Inc. and then contributed to TECO Gas Operations, Inc. This is a transaction between entities under common control; therefore, TEC did not recognize a gain or loss on the transaction.

Included in the liabilities transferred was PGS’s allocation of outstanding unsecured notes issued by TEC and outstanding short-term borrowings. The obligations related to these combined borrowings are reflected in an intercompany loan agreement between TEC and PGSI. The initial obligation of PGSI under the loan agreement at January 1, 2023 was a term loan in the principal amount of $670 million and a revolving loan in the principal amount of $66 million. The maturity date for both is December 29, 2023. PGSI intends to access the third-party lending market during 2023 but cannot predict when during the year that it will do so. To assist its affiliate and to facilitate an orderly transfer of its gas assets, Tampa Electric will continue to be responsible for providing capital as needed to PGSI under an intercompany loan agreement guaranteed by TECO Energy and TECO Gas Operations, Inc.

See Note 11 for certain financial information related to PGS. In addition, the following table presents the assets and liabilities of PGS in TEC’s Consolidated Balance Sheet as of December 31, 2022:

 

 

 

December 31,

 

(millions)

 

2022

 

Property, plant and equipment

 

 

 

Utility plant

 

$

2,938

 

Accumulated depreciation

 

 

(687

)

Total property, plant and equipment, net

 

 

2,251

 

 

 

 

 

Current assets

 

 

 

Cash and cash equivalents

 

 

4

 

Receivables, less allowance for credit losses of $1 at December 31, 2022

 

 

62

 

Due from affiliates

 

 

4

 

Inventories, at average cost

 

 

 

Materials and supplies

 

 

5

 

Regulatory assets

 

 

9

 

Prepayments and other current assets

 

 

4

 

Total current assets

 

 

88

 

 

 

 

 

Other assets

 

 

 

Regulatory assets

 

 

53

 

Deferred charges and other assets

 

 

79

 

Total other assets

 

 

132

 

Total assets

 

$

2,471

 

 

 

 

 

Capitalization

 

 

 

Common stock

 

$

871

 

Retained earnings

 

 

121

 

Total capital

 

 

992

 

Long-term debt

 

 

564

 

Total capital

 

 

1,556

 

 

 

 

 

Current liabilities

 

 

 

Notes payable

 

 

166

 

Accounts payable

 

 

78

 

Due to affiliates

 

 

27

 

Customer deposits

 

 

30

 

Regulatory liabilities

 

 

11

 

Accrued interest

 

 

4

 

Accrued taxes

 

 

5

 

Other

 

 

4

 

Total current liabilities

 

 

325

 

 

 

 

 

Other liabilities

 

 

 

Deferred income taxes

 

 

238

 

Regulatory liabilities

 

 

277

 

Deferred credits and other liabilities

 

 

75

 

Total other liabilities

 

 

590

 

 

 

 

 

Total liabilities and capital

 

$

2,471