XML 55 R10.htm IDEA: XBRL DOCUMENT v3.19.3
Impairment of Assets
9 Months Ended
Sep. 30, 2019
Goodwill And Intangible Assets Disclosure [Abstract]  
Impairment of Assets

3. Impairment of Assets

 

2019 Evaluation.  During the third quarter of 2019, we evaluated three of our drilling rigs that had indicators of impairment. Based on our assumptions and analysis at that time, we determined that the undiscounted probability-weighted cash flow for each rig was in excess of its respective carrying value. As a result, we concluded that no impairment of these rigs had occurred at September 30, 2019.

 

As of September 30, 2019, there were ten rigs in our drilling fleet not previously written down to scrap, for which there were no current indicators that their carrying amounts may not be recoverable and, thus, were not evaluated for impairment. If market fundamentals in the offshore oil and gas industry deteriorate further or a projected market recovery is further delayed, we may be required to recognize additional impairment losses in future periods.

 

2018 Impairment. During the second quarter of 2018, we recorded an impairment loss of $27.2 million to recognize a reduction in fair value of the Ocean Scepter, a jack-up rig that was marketed for sale at that time. We estimated the fair value of the impaired jack-up rig using a market approach based on a signed agreement to sell the rig, less estimated costs to sell. We considered this valuation approach to be a Level 3 fair value measurement due to the level of estimation involved as the sale had not yet been completed at the time of our analysis. The Ocean Scepter was sold in July 2018.