EX-99.2 3 d452732dex992.htm EX-99.2 EX-99.2

Exhibit 99.2

 

LOGO

 

     Water
Depth¹
         Year             Estimated    Estimated

Rig Name

   (feet)    

Type2

   Built3  

Location

  

Operator

   Start Date    End Date

Gulf of Mexico (GOM)

 

               

Ocean BlackHornet

     12,000     DS 15K DP    2014   US GOM    bp    Feb-2023    Feb-2025

Ocean BlackLion

     12,000     DS 15K DP    2015   US GOM    bp    Sep-2022    Sep-2024

Auriga4

     12,000     DS 15K DP    2013   US GOM    bp    Mar-2022    Mar-2023
                Mar-2023    Mar-2024

Vela4

     12,000     DS 15K DP    2013   US GOM    Beacon    Jan-2023    Apr-2023
             bp    Apr-2023    Aug-2023
             Beacon    Aug-2023    1Q 2024

North Sea / Mediterranean / W. Africa

        

Ocean Patriot

     3,000     SS 15K    1983   UK    Apache    Jun-2021    Jul-23
             Repsol    Sep-23    4Q 2023

Ocean Endeavor

     10,000     SS 15K    2007   UK    Shell    May-2019    4Q 2024

Ocean GreatWhite

     10,000     SS 15K DP    2016   UK    bp    Mar-2023    1Q 2024

Ocean BlackHawk

     12,000     DS 15K DP    2014   Senegal    Woodside    Jul-2022    2Q 2023
          US GOM    Anadarko Petroleum Corporation (a wholly owned subsidiary of Occidental)    4Q 2023    4Q 2024

Ocean BlackRhino

     12,000     DS 15K DP    2014   Senegal    Woodside    Jul-2021    2Q 2024

Australasia

                  

Ocean Apex

     6,000     SS 15K    2014   Australia    Woodside    Jun-2022    Apr-2023
          Australia    Woodside    3Q 2023    4Q 2023
          Australia    Chevron    4Q 2023    4Q 2023
          Australia    Inpex    1Q 2024    3Q 2024
          Australia    Santos    3Q 2024    2Q 2025

South America

                  

Ocean Courage

     10,000     SS 15K DP    2009   Brazil    Petrobras    Jun-2021    3Q 2023
                4Q 2023    4Q 2027

Stacked

                  

Ocean Valiant

     5,500     SS 15K    1988   UK    —      May-2020    —  

Ocean Onyx

     6,000     SS 15K    2014   Malaysia    —      Sep-2022    —  

Ocean Monarch

     10,000     SS 15K    2008   Malaysia    —      May-2022    —  

NOTES

 

(1)

Water Depth refers to the rig’s rated operating water depth capability. Often, rigs are capable of drilling or have drilled in greater water depths.

(2)

Rig Type and Capabilities: DS=Drillship; 15K=15,000 PSI Well-Control System; DP=Dynamically Positioned Rig; SS=Semisubmersible

(3)

Year Built represents when rig was built and originally placed in service or year redelivered with significant enhancements that enabled the rig to be classified within a different floater category than when originally constructed.

(4)

Managed on behalf of Aquadrill LLC.


LOGO  

Diamond Offshore Drilling, Inc.

Rig Status Report

Statements contained in this report that are not historical facts are “forward-looking statements” within the meaning of the federal securities laws. Forward-looking statements are inherently uncertain and subject to a variety of assumptions, risks and uncertainties that could cause actual results to differ materially from those anticipated or expected by management of the Company. A discussion of the important risk factors and other considerations that could materially impact these matters as well as the Company’s overall business and financial performance can be found in the Company’s reports filed with the Securities and Exchange Commission, and readers of this report are urged to review those reports carefully when considering these forward-looking statements. Copies of these reports are available through the Company’s website at www.diamondoffshore.com. These risk factors include, among others, risks associated with worldwide demand for drilling services, level of activity in the oil and gas industry, renewing or replacing expired or terminated contracts, contract cancellations and terminations, maintenance and realization of backlog, competition and industry fleet capacity, impairments and retirements, operating risks, changes in tax laws and rates, regulatory initiatives and compliance with governmental regulations, construction of new builds, casualty losses, and various other factors, many of which are beyond the Company’s control. Given these risk factors, investors and analysts should not place undue reliance on forward-looking statements. Each forward-looking statement speaks only as of the date of this report. The Company expressly disclaims any obligation or undertaking to release publicly any updates or revisions to any forward-looking statement to reflect any change in the Company’s expectations with regard thereto or any change in events, conditions or circumstances on which any forward-looking statement is based.