In addition those reported in our 2012 Annual Report on Form 10-K, we entered into the following new long-term commitments through September 30, 2013:
TEP COMMITMENTS
 
Purchase Commitments
 
2013
2014
2015
2016
2017
Thereafter
Total
 
Millions of Dollars
Purchased Power, Including Renewable PPA(1)
$
2

$
18

$
6

$
4

$
4

$
58

$
92

Capital Lease Obligations(2)


46




46

RES Performance-Based Incentives(3)
1

1

1

1

1

7

12

Fuel Transportation(4)
4

5

5

5

5

1

25

   Total Purchase Commitments
$
7

$
24

$
58

$
10

$
10

$
66

$
175

(1)
Purchased Power costs are recoverable from customers through the PPFAC. A portion of the Renewable Power Purchase Agreement (PPA) is recoverable through the PPFAC, with the balance recoverable through the RES tariff.
(2)
In the third and fourth quarters of 2013, TEP entered into agreements to purchase certain Springerville Unit 1 leased interests. See Note 5.
(3)
The RES Performance-Based Incentive (PBI) costs are recoverable through the RES tariff.
(4)
Fuel Transportation costs are recoverable from customers through the PPFAC.
UNS GAS COMMITMENTS
Forward Energy Contracts
UNS Gas entered into new forward energy commitments that settle through 2016 at fixed prices per million British thermal units (MMBtu). UNS Gas’ minimum payment obligations for these purchases are $2 million in 2014, $3 million in 2015, and $2 million in 2016.
Fuel Transportation
UNS Gas entered into revised gas transportation agreements in August 2013. UNS Gas anticipates that its commitments will increase by $3 million in 2013, $9 million each year in 2014 through 2016, $10 million in 2017, and $56 million thereafter.
UNS ELECTRIC COMMITMENTS
Purchased Power Contracts
UNS Electric entered into new forward purchased power commitments that will settle through 2015 at fixed prices per MWh. UNS Electric’s minimum payment obligations for these purchases are $1 million in 2014 and $4 million in 2015.
TEP CONTINGENCIES
Claim Related to San Juan Generating Station
San Juan Coal Company (SJCC) operates an underground coal mine in an area where certain gas producers have oil and gas leases with the federal government, the State of New Mexico, and private parties. These gas producers allege that SJCC’s underground coal mine interferes with their operations, reducing the amount of natural gas they can recover. SJCC compensated certain gas producers for any remaining production from wells deemed close enough to the mine to warrant plugging and abandoning them. These settlements, however, do not resolve all potential claims by gas producers in the area. TEP owns 50% of Units 1 and 2 at San Juan Generating Station (San Juan), which represents approximately 20% of the total generation capacity at San Juan, and is responsible for its share of any settlements. TEP cannot estimate the impact of any future claims by these gas producers on the cost of coal at San Juan.
In August 2013, the Bureau of Land Management (BLM) proposed regulations that, among other things, redefine the term “underground mine” to exclude high-wall mining operations and impose a higher surface mine coal royalty on high-wall mining. SJCC utilized high-wall mining techniques at its surface mines prior to beginning underground mining operations in January 2003. If the proposed regulations become effective, SJCC may be subject to additional royalties on coal delivered to San Juan between August 2000 and January 2003 totaling approximately $5 million of which TEP’s proportionate share would approximate $1 million. TEP cannot predict the final outcome of the BLM’s proposed regulations.
Claims Related to Four Corners Generating Station
In October 2011, EarthJustice, on behalf of several environmental organizations, filed a lawsuit in the United States District Court for the District of New Mexico against Arizona Public Service Company (APS) and the other Four Corners Generating Station (Four Corners) participants alleging violations of the Prevention of Significant Deterioration (PSD) provisions of the Clean Air Act at Four Corners. In January 2012, EarthJustice amended their complaint alleging violations of New Source Performance Standards resulting from equipment replacements at Four Corners. Among other things, the plaintiffs seek to have the court issue an order to cease operations at Four Corners until any required PSD permits are issued and order the payment of civil penalties, including a beneficial mitigation project. In April 2012, APS filed motions to dismiss with the court for all claims asserted by EarthJustice in the amended complaint. All parties filed a joint motion to stay until December 1, 2013.
TEP owns 7% of Four Corners Units 4 and 5 and is liable for its share of any resulting liabilities. TEP cannot predict the final outcome of the claims relating to Four Corners, and, due to the general and non-specific nature of the claims and the indeterminate scope and nature of the injunctive relief sought for this claim, TEP cannot determine estimates of the range of loss at this time. TEP accrued estimated losses of less than $1 million in 2011 for this claim based on its share of a settlement offer to resolve the claim.
In May 2013, the New Mexico Taxation and Revenue Department issued a notice of assessment for coal severance tax, penalties, and interest totaling $30 million to the coal supplier at Four Corners. The coal supplier and Four Corners’ operating agent intend to contest the validity of the assessment on behalf of the participants in Four Corners, who will be liable for their share of any resulting liabilities. TEP’s share of the assessment based on its ownership of Four Corners is approximately $1 million. TEP cannot predict the outcome or timing of resolution of this claim.
Mine Closure Reclamation at Generating Stations Not Operated by TEP
TEP pays ongoing reclamation costs related to coal mines that supply generating stations in which TEP has an ownership interest but does not operate. TEP is liable for a portion of final reclamation costs upon closure of the mines servicing Navajo, San Juan, and Four Corners. TEP’s share of reclamation costs is expected to be $27 million upon expiration of the coal supply agreements, which expire between 2016 and 2019. The reclamation liability (present value of future liability) recorded was $18 million at September 30, 2013 and $16 million at December 31, 2012.
Amounts recorded for final reclamation are subject to various assumptions, such as estimations of reclamation costs, the dates when final reclamation will occur, and the credit-adjusted risk-free interest rate to be used to discount future liabilities. As these assumptions change, TEP will prospectively adjust the expense amounts for final reclamation over the remaining coal supply agreements’ terms. TEP does not believe that recognition of its final reclamation obligations will be material to TEP in any single year because recognition will occur over the remaining terms of its coal supply agreements.
TEP’s PPFAC allows us to pass through most fuel costs, including final reclamation costs, to customers. Therefore, TEP classifies these costs as a regulatory asset by increasing the regulatory asset and the reclamation liability over the remaining life of the coal supply agreements on an accrual basis and recovering the regulatory asset through the PPFAC as final mine reclamation costs are paid to the coal suppliers.
Tucson to Nogales Transmission Line
TEP and UNS Electric are parties to a project development agreement for the joint construction of a 60-mile transmission line from Tucson, Arizona to Nogales, Arizona. This project was initiated in response to an order by the ACC to UNS Electric to improve the reliability of electric service in Nogales. TEP and UNS Electric expect to abandon the project based on the cost of the proposed 345-kV line, the difficulty in reaching agreement with the Forest Service on a path for the line, and concurrence by the ACC of recent transmission plans filed by TEP and UNS Electric supporting elimination of this project. As part of the 2013 TEP Rate Order, TEP agreed to seek recovery of the project costs from FERC before seeking rate recovery from the ACC. See Note 2. In 2012, TEP recorded a regulatory asset of $5 million and UNS Electric recorded a regulatory asset of $0.2 million for the balance deemed probable of recovery.
RESOLUTION OF TEP CONTINGENCIES
Springerville Generating Station Unit 3 Outage
TEP paid Tri-State Generating and Transmission Association, Inc. (Tri-State) $2 million in March 2013 as a result of an outage at Springerville Unit 3 in 2012. TEP accrued the pre-tax loss in July 2012 as a result of not meeting certain availability requirements under the terms of TEP's operating agreement with Tri-State.
ENVIRONMENTAL MATTERS
Environmental Regulation
The Environmental Protection Agency (EPA) limits the amount of sulfur dioxide (SO2), nitrogen oxide (NOx), particulate matter, mercury and other emissions released into the atmosphere by power plants. TEP may incur added costs to comply with future changes in federal and state environmental laws, regulations, and permit requirements at its power plants. Complying with these changes may reduce operating efficiency. TEP expects to recover the cost of environmental compliance from its ratepayers.
Hazardous Air Pollutant Requirements
The Clean Air Act requires the EPA to develop emission limit standards for hazardous air pollutants that reflect the maximum achievable control technology. In February 2012, the EPA issued final rules to set the standards for the control of mercury emissions and other hazardous air pollutants from power plants.
Navajo
Based on the EPA’s standards, Navajo may require mercury and particulate matter emission control equipment by 2015. TEP’s share of the estimated capital cost of this equipment is less than $1 million for mercury control and about $43 million if the installation of baghouses to control particulates is necessary. The operator of Navajo is currently analyzing the need for baghouses under various regulatory scenarios, which will be affected by final Best Available Retrofit Technology (BART) rules when issued. TEP expects its share of the annual operating costs for mercury control and baghouses to be less than $1 million each.
San Juan
TEP expects San Juan’s current emission controls to be adequate to comply with the EPA’s final standards.
Four Corners
Based on the EPA’s final standards, Four Corners may require mercury emission control equipment by 2015. TEP's share of the estimated capital cost of this equipment is less than $1 million. TEP expects its share of the annual operating cost of the mercury emission control equipment to be less than $1 million.
Springerville Generating Station
Based on the EPA’s final standards, Springerville Generating Station (Springerville) may require mercury emission control equipment by 2015. The estimated capital cost of this equipment for Springerville Units 1 and 2 is about $5 million. TEP expects the annual operating cost of the mercury emission control equipment to be about $3 million.
Sundt Generating Station
TEP expects the final EPA standards will have little effect on capital expenditures at Sundt Generating Station (Sundt).
Regional Haze Rules
The EPA's Regional Haze Rules require emission controls known as BART for certain industrial facilities emitting air pollutants that reduce visibility. The rules call for all states to establish goals and emission reduction strategies for improving visibility in national parks and wilderness areas. States must submit these goals and strategies to the EPA for approval. Because Navajo and Four Corners are located on the Navajo Indian Reservation, they are not subject to state oversight. The EPA oversees regional haze planning for these power plants.
Complying with the EPA’s BART findings, and with other future environmental rules, may make it economically impractical to continue operating the Navajo, San Juan, and Four Corners power plants or for individual owners to continue to participate in these power plants. TEP cannot predict the ultimate outcome of these matters.
Navajo
In January 2013, the EPA proposed a BART determination that would require the installation of Selective Catalytic Reduction (SCR) technology on all three units at Navajo by 2023. In July 2013, SRP, along with other stakeholders including impacted government agencies, environmental organizations, and tribal representatives, submitted an agreement to the EPA that would achieve greater NOx emission reductions than the EPA's proposed BART rule. In September 2013, EPA issued a supplemental proposal incorporating the provisions of the agreement as a better-than-BART alternative.
Among other things, the agreement calls for the shut down of one unit or an equivalent reduction in emissions by 2020. The shutdown of one unit will not impact the total amount of energy delivered to TEP from Navajo. Additionally, the remaining Navajo participants would be required to install SCR or an equivalent technology on the remaining two units by 2030. As part of the agreement, the current owners have committed to cease their operation of conventional coal-fired generation at Navajo no later than December 2044. The Navajo Nation can continue operation after 2044 at its election. If SCR technology is ultimately implemented at Navajo, TEP estimates its share of the capital cost will be $42 million. Also, the installation of SCR technology at Navajo could increase the power plant's particulate emissions which may require that baghouses be installed. TEP estimates that its share of the capital expenditure for baghouses would be about $43 million. TEP's share of annual operating costs for SCR and baghouses is estimated at less than $1 million each.
San Juan
In August 2011, the EPA issued a Federal Implementation Plan (FIP) establishing new emission limits for air pollutants at San Juan. These requirements are more stringent than those proposed by the State of New Mexico. The FIP requires the installation of SCR technology with sorbent injection on all four units to reduce NOx and control sulfuric acid emissions by September 2016. TEP estimates its share of the cost to install SCR technology with sorbent injection to be between $180 million and $200 million. TEP expects its share of the annual operating costs for SCR technology to be approximately $6 million.
In 2011, Public Service Company of New Mexico (PNM) filed a petition for review of, and a motion to stay, the FIP with the United States Court of Appeals for the Tenth Circuit (Tenth Circuit). In addition, the operator filed a request for reconsideration of the rule with the EPA and a request to stay the effectiveness of the rule pending the EPA's reconsideration and review by the Tenth Circuit. The State of New Mexico filed similar motions with the Tenth Circuit and the EPA. Several environmental groups were granted permission to join in opposition to PNM's petition to review in the Tenth Circuit. In addition, WildEarth Guardians filed a separate appeal against the EPA challenging the FIP's five-year implementation schedule. PNM was granted permission to join in opposition to that appeal. In March 2012, the Tenth Circuit denied PNM's and the State of New Mexico's motion for stay. Oral argument on the appeal was heard in October 2012 and the parties are currently awaiting the court's decision. In February 2013, the Tenth Circuit referred the litigation to the Tenth Circuit Mediation Office, which has authority to require the parties to attend mediation conferences to informally resolve issues in the pending appeals.
In February 2013, the State of New Mexico, the EPA, and PNM signed a non-binding agreement that outlines an alternative to the FIP. The terms of the agreement include: the retirement of San Juan Units 2 and 3 by December 31, 2017; the replacement by PNM of those units with non-coal generation sources; and the installation of Selective Non-Catalytic Reduction technology (SNCR) on San Juan Units 1 and 4 by January 2016 or later depending on the timing of EPA approvals. The New Mexico Environmental Department (NMED) prepared a revision to the regional haze SIP incorporating the provisions of the agreement, and in September 2013, the New Mexico Environmental Improvement Board approved the SIP revision. The SIP revision now awaits final EPA approval.
TEP estimates its share of the cost to install SNCR technology on San Juan Unit 1 would be approximately $35 million. TEP's share of incremental annual operating costs for SNCR is estimated at $1 million. TEP owns 340 MW, or 50%, of San Juan Units 1 and 2. At September 30, 2013, the book value of TEP's share of San Juan Unit 2 was $114 million. If Unit 2 is retired early, we expect to request ACC approval to recover, over a reasonable time period, all costs associated with the early closure of the unit. We are evaluating various replacement resources. Any decision regarding early closure and replacement resources will require various actions by third parties as well as UNS Energy board and regulatory approvals. TEP cannot predict the ultimate outcome of this matter.
Four Corners
In August 2012, the EPA finalized the regional haze FIP for Four Corners. The final FIP requires SCR technology to be installed on all five units by 2017. However, the FIP also includes an alternative plan that allows APS to close their wholly-owned Units 1, 2, and 3 and install SCR technology on Units 4 and 5. This option allows the installation of SCR technology to be delayed until July 2018. APS must select which FIP alternative to implement by December 31, 2013. In either case, TEP's estimated share of the capital costs to install SCR technology on Units 4 and 5 is approximately $35 million. TEP's share of incremental annual operating costs for SCR is estimated at $2 million.
Springerville
The BART provisions of the Regional Haze Rules requiring emission control upgrades do not apply to Springerville. Other provisions of the Regional Haze Rule requiring further emission reduction are not likely to impact Springerville operations until after 2018.
Sundt
In July 2013, the EPA rejected the Arizona state implementation plan determination that Sundt Unit 4 is not subject to the BART provisions of the Regional Haze Rule. Under the Regional Haze Rule, Sundt Unit 4 will be required to reduce certain emissions within five years of the final EPA BART determination. The EPA postponed its expected release of a proposed BART requirement for Sundt Unit 4 until December 2013, with a final determination expected in May 2014. While TEP does not agree that Sundt Unit 4 is BART eligible, in anticipation of EPA's proposed BART requirements, TEP has submitted a plan for EPA approval proposing to eliminate coal as a fuel after December 2017.
Greenhouse Gas Regulation
In June 2013, President Obama directed the EPA to move forward with carbon emission regulations for both new and existing fossil-fueled power plants. 
In September 2013, the EPA issued a re-proposed rule for new power plants. UNS Energy does not anticipate that a final rule related to new fossil-fueled power plant sources will have a significant impact on operations.
For existing power plants, the President ordered the EPA to:
propose carbon emission standards by June 1, 2014;
finalize those standards by June 1, 2015; and
require states to submit their implementation plans to meet the standards by June 30, 2016. 