COMMITMENTS, GUARANTEES AND CONTINGENCIES
12 Months Ended
Dec. 31, 2025
Commitments and Contingencies Disclosure [Abstract]  
COMMITMENTS, GUARANTEES AND CONTINGENCIES COMMITMENTS, GUARANTEES AND CONTINGENCIES
The disclosures in this note apply to all Registrants unless indicated otherwise.

The Registrants are subject to certain claims and legal actions arising in the ordinary course of business.  In addition, the Registrants’ business activities are subject to extensive governmental regulation related to public health and the environment.  The ultimate outcome of such pending or potential litigation against the Registrants cannot be predicted.  Management accrues contingent liabilities only when management concludes that it is both probable that a liability has been incurred at the date of the financial statements and the amount of loss can be reasonably estimated. When management determines that it is not probable, but rather reasonably possible that a liability has been incurred at the date of the financial statements, management discloses such contingencies and the possible loss or range of loss if such estimate can be made. Any estimated range is based on currently available information and involves elements of judgment and significant uncertainties. Any estimated range of possible loss may not represent the maximum possible loss exposure. Circumstances change over time and actual results may vary significantly from estimates.

For current proceedings not specifically discussed below, management does not anticipate that the liabilities, if any, arising from such proceedings would have a material effect on the financial statements.
COMMITMENTS (Applies to all Registrants except AEP Texas and AEPTCo)

AEP subsidiaries have substantial commitments for fuel, energy and capacity contracts as part of the normal course of business. Certain contracts contain penalty provisions for early termination.

In accordance with the accounting guidance for “Commitments”, the following tables summarize the Registrants’ actual contractual commitments as of December 31, 2025:
Contractual Commitments - AEPLess Than
1 Year
2-3 Years4-5 YearsAfter
5 Years
Total
(in millions)
Fuel Purchase Contracts (a)$1,103 $1,560 $338 $241 $3,242 
Energy and Capacity Purchase Contracts153 329 292 294 1,068 
Construction Contract for Capital Assets (b)600 725 — — 1,325 
Total$1,856 $2,614 $630 $535 $5,635 

Contractual Commitments - APCoLess Than
1 Year
2-3 Years4-5 YearsAfter
5 Years
Total
(in millions)
Fuel Purchase Contracts (a)$489 $808 $126 $35 $1,458 
Energy and Capacity Purchase Contracts39 71 43 33 186 
Total$528 $879 $169 $68 $1,644 

Contractual Commitments - I&MLess Than
1 Year
2-3 Years4-5 YearsAfter
5 Years
Total
(in millions)
Fuel Purchase Contracts (a)$261 $382 $200 $203 $1,046 
Energy and Capacity Purchase Contracts113 242 149 205 709 
Total$374 $624 $349 $408 $1,755 

Contractual Commitments - OPCoLess Than
1 Year
2-3 Years4-5 YearsAfter
5 Years
Total
(in millions)
Energy and Capacity Purchase Contracts$31 $66 $60 $43 $200 
Contractual Commitments - PSOLess Than
1 Year
2-3 Years4-5 YearsAfter
5 Years
Total
(in millions)
Fuel Purchase Contracts (a)$28 $12 $— $— $40 
Energy and Capacity Purchase Contracts45 71 36 13 165 
Total$73 $83 $36 $13 $205 

Contractual Commitments - SWEPCoLess Than
1 Year
2-3 Years4-5 YearsAfter
5 Years
Total
(in millions)
Fuel Purchase Contracts (a)$102 $72 $— $— $174 
Energy and Capacity Purchase Contracts— — 
Total$109 $74 $— $— $183 

(a)Represents contractual commitments to purchase coal, natural gas, uranium and other consumables as fuel for electric generation along with related transportation of the fuel.
(b)In January 2026, an unregulated AEP subsidiary entered into an agreement to acquire solid oxide fuel cells for approximately $2.65 billion. This is not included in the presented commitments as of December 31, 2025.
GUARANTEES

Liabilities for guarantees are recorded in accordance with the accounting guidance for “Guarantees.”  There is no collateral held in relation to any guarantees.  In the event any guarantee is drawn, there is no recourse to third-parties unless specified below.

Letters of Credit (Applies to AEP)

Standby letters of credit are entered into with third-parties.  These letters of credit are issued in the ordinary course of business and cover items such as natural gas and electricity risk management contracts, construction contracts, insurance programs, security deposits and debt service reserves.

AEP has $5 billion and $1 billion revolving credit facilities due in March 2029 and March 2027, respectively. AEP may issue up to $1.2 billion as letters of credit under these revolving credit facilities on behalf of subsidiaries. As of December 31, 2025, no letters of credit were issued under the revolving credit facility.

An uncommitted facility gives the issuer of the facility the right to accept or decline each request made under the facility. AEP issues letters of credit on behalf of subsidiaries under six uncommitted facilities totaling $450 million. The Registrants’ maximum future payments for letters of credit issued under the uncommitted facilities as of December 31, 2025 were as follows:
CompanyAmountMaturity
(in millions)
AEP$377 January 2026 to November 2026

Indemnifications and Other Guarantees

Contracts

The Registrants enter into certain types of contracts which require indemnifications.  Typically these contracts include, but are not limited to, sale agreements, lease agreements, purchase agreements and financing agreements.  Generally, these agreements may include, but are not limited to, indemnifications around certain tax, contractual and environmental matters.  With respect to sale agreements, exposure generally does not exceed the sale price.  As of December 31, 2025, there were no material liabilities recorded for any indemnifications.

AEPSC conducts power purchase-and-sale activity on behalf of APCo, I&M, KPCo and WPCo, who are jointly and severally liable for activity conducted on their behalf.  AEPSC also conducts power purchase-and-sale activity on behalf of PSO and SWEPCo, who are jointly and severally liable for activity conducted on their behalf.
Lease Obligations

Certain Registrants lease equipment under master lease agreements.  See “Master Lease Agreements” section of Note 13 for additional information.
ENVIRONMENTAL CONTINGENCIES (Applies to All Registrants except AEPTCo)

Federal EPA’s Revised CCR Rule

In April 2024, the Federal EPA finalized revisions to the CCR Rule (Legacy CCR Rule) to expand the scope of the rule to include inactive impoundments at inactive facilities (legacy CCR surface impoundments) as well as to establish requirements for currently exempt solid waste management units that involve the direct placement of CCR on the land (CCR management units). The Federal EPA is requiring that owners and operators of legacy surface impoundments comply with all of the Legacy CCR Rule requirements applicable to inactive CCR surface impoundments at active facilities, except for the location restrictions and liner design criteria. The rule establishes compliance deadlines for legacy surface impoundments to meet regulatory requirements, including a requirement to initiate closure within five years after the effective date of the final rule. The rule requires evaluations to be completed at both active facilities and inactive facilities with one or more legacy surface impoundments. Closure may be accomplished by applying an impermeable cover system over the CCR material (closure in place) or the CCR material may be excavated and placed in a compliant landfill (closure by removal). Groundwater monitoring and other analysis over the next three years will provide additional information on the planned closure method. AEP evaluated the applicability of the rule to current and former plant sites and recorded incremental ARO in the second quarter of 2024, as shown in the table below, based on initial cost estimates primarily reflecting compliance with the rule through closure in place and future groundwater monitoring requirements pursuant to the Legacy CCR Rule.

RegistrantIncrease in AROIncrease in Generation Property (a)Increase in Regulatory Assets (b) Charged to Operating Expenses (c)
(in millions)
APCo$312 $75 $237 $— 
I&M85 — 72 13 
OPCo53 — — 53 
PSO34 34 — — 
SWEPCo24 24 — — 
Non-Registrants166 44 46 76 
Total$674 $177 $355 $142 

(a)ARO is related to a legacy CCR surface impoundment or CCR management unit at an operating generation facility.
(b)ARO is related to a legacy CCR surface impoundment or CCR management unit at a retired generation facility and recognition of a regulatory asset in accordance with the accounting guidance for “Regulated Operations” is supported.
(c)ARO is related to a legacy CCR surface impoundment or CCR management unit and recognition of a regulatory asset in accordance with the accounting guidance for “Regulated Operations” is not yet supported.

As further groundwater monitoring and other analysis is performed, management expects to refine the assumptions and underlying cost estimates used in recording the ARO. These refinements may include, but are not limited to, changes in the expected method of closure, changes in estimated quantities of CCR at each site, the identification of new CCR management units, among other items. These future changes could have a material impact on the ARO and materially reduce future net income and cash flows and further impact financial condition.
In January 2026, APCo received a final order from the Virginia SCC approving the recovery of $80 million of Legacy CCR Rule regulatory assets through 2041 and concurrent recovery of ongoing depreciation and accretion expenses. AEP will continue to seek cost recovery through regulated rates in other jurisdictions, including proposal of new regulatory mechanisms for cost recovery where existing mechanisms are not applicable. The rule could have an additional, material adverse impact on net income, cash flows and financial condition if AEP cannot ultimately recover these additional costs of compliance. Several parties, including AEP and one of its trade associations, have filed petitions for review of the Legacy CCR Rule with the U.S. Court of Appeals for the District of Columbia Circuit. The litigation is being held in abeyance. In December 2025, the Federal EPA informed the court that it anticipates publishing a proposed rule in January 2026 that should be finalized by October 2026, which will revise certain provisions of the Legacy CCR Rule for both legacy CCR surface impoundments and CCR management units. The Federal EPA further noted that it has been working to obtain technical information to inform its reconsideration and develop a record to support a proposal. Reconsideration of the rule will require a new round of notice-and-comment rulemaking.

In November 2025, the Federal EPA proposed to extend by three years the compliance deadline applicable to certain facilities operating pursuant to alternative closure deadlines for unlined surface impoundments greater than 40 acres. In February 2026, the Federal EPA finalized a rule that provides additional time to meet facility evaluation requirements for identifying CCR management units and to comply with groundwater monitoring provisions. Additionally, this rule makes conforming changes to the remaining CCR management units compliance deadlines. Management cannot predict the outcome of the litigation or any further actions by the Federal EPA related to the rule.

The Comprehensive Environmental Response Compensation and Liability Act (Superfund) and State Remediation

By-products from the generation of electricity include materials such as ash, slag, sludge, low-level radioactive waste and SNF.  Coal combustion by-products, which constitute the overwhelming percentage of these materials, are typically treated and deposited in captive disposal facilities or are beneficially utilized.  In addition, the generation plants and transmission and distribution facilities have used asbestos, polychlorinated biphenyls and other hazardous and non-hazardous materials.  The Registrants currently incur costs to dispose of these substances safely.

Superfund addresses clean-up of hazardous substances that are released to the environment.  The Federal EPA administers the clean-up programs.  Several states enacted similar laws.  As of December 31, 2025, AGR, APCo, OPCo and SWEPCo are named as a Potentially Responsible Party (PRP) for one, one, two and one sites, respectively, by the Federal EPA for which alleged liability is unresolved.  There are 11 additional sites for which APCo, I&M, KPCo, OPCo and SWEPCo received information requests which could lead to PRP designation. In those instances where a PRP or defendant has been named, disposal or recycling activities were in accordance with the then-applicable laws and regulations. Superfund does not recognize compliance as a defense, but imposes strict liability on parties who fall within its broad statutory categories.  Liability has been resolved for a number of sites with no significant effect on net income.

Management evaluates the potential liability for each Superfund site separately, but several general statements can be made about potential future liability.  Allegations that materials were disposed at a particular site are often unsubstantiated and the quantity of materials deposited at a site can be small and often non-hazardous.  Although Superfund liability has been interpreted by the courts as joint and several, typically many parties are named as PRPs for each site and several of the parties are financially sound enterprises.  As of December 31, 2025, management’s estimates do not anticipate material clean-up costs for identified Superfund sites.

NUCLEAR CONTINGENCIES (APPLIES TO AEP AND I&M)

I&M owns and operates the two-unit 2,296 MW Cook Plant under licenses granted by the NRC.  I&M has a significant future financial obligation to dispose of SNF and to safely decommission and decontaminate the plant.  The licenses to operate the two nuclear units at the Cook Plant expire in 2034 and 2037. Management has started the application process for license extensions for both units that would extend Unit 1 and Unit 2 to 2054 and 2057, respectively.  The operation of a nuclear facility also involves special risks, potential liabilities and specific regulatory and safety requirements.  By agreement, I&M is partially liable, together with all other electric utility companies that own nuclear generation units, for a nuclear power plant incident at any nuclear plant in the U.S.  Should a nuclear incident occur at any nuclear power plant in the U.S., the resultant liability could be substantial.
Decommissioning and Low-Level Waste Accumulation Disposal

The costs to decommission a nuclear plant are affected by NRC regulations and the SNF disposal program.  Decommissioning costs are accrued over the service life of Cook Plant.  The most recent decommissioning cost study was performed in 2024.  According to that study, stated in 2024 undiscounted dollars, the estimated cost of decommissioning and disposal of low-level radioactive waste was $2.4 billion, with additional ongoing costs of $7 million per year for post decommissioning storage of SNF and an eventual cost of $45 million for the subsequent decommissioning of the SNF storage facility. I&M recovers estimated decommissioning costs for the Cook Plant in its rates.  Decommissioning contributions received from customers are deposited in external trusts. Based on the funded status of the trusts, contributions were not collected from customers in 2025.

As of December 31, 2025 and 2024, the total decommissioning trust fund balances were $4.5 billion and $4 billion, respectively.  The increase in the trust fund balance was driven by favorable investment performance in 2025. Trust fund earnings increase the fund assets and may decrease the amount remaining to be recovered from customers. Trust fund losses decrease the fund assets and may increase the amount remaining to be recovered from customers.  The decommissioning costs (including unrealized gains and losses, interest and trust funds expenses) increase or decrease the recorded liability.

I&M continues to work with regulators and customers to establish rates designed to collect the estimated costs of decommissioning the Cook Plant.  However, future net income and cash flows would be reduced and financial condition could be impacted if the cost of SNF disposal and decommissioning increases and cannot be recovered.

Spent Nuclear Fuel Disposal

The federal government is responsible for permanent SNF disposal and assesses fees to nuclear plant owners for SNF disposal.  A fee of one-mill per KWh for fuel consumed after April 6, 1983 at the Cook Plant was collected from customers and remitted to the DOE through May 14, 2014. In May 2014, pursuant to court order from the U.S Court of Appeals for the District of Columbia Circuit, the DOE adjusted the fee to $0. As of December 31, 2025 and 2024, fees and related interest of $330 million and $316 million, respectively, for fuel consumed prior to April 7, 1983 were recorded as Long-term Debt and funds collected from customers along with related earnings totaling $381 million and $367 million, respectively, to pay the fee, were recorded as part of Spent Nuclear Fuel and Decommissioning Trusts on the balance sheets.  I&M has not paid the government the pre-April 1983 fees due to continued delays and uncertainties related to the federal disposal program.

In 2011, I&M signed a settlement agreement with the federal government which permits I&M to make annual filings to recover certain SNF storage costs incurred as a result of the government’s delay in accepting SNF for permanent storage.  Under the settlement agreement, I&M received $11 million, $12 million and $21 million in 2025, 2024 and 2023, respectively, to recover costs and will be eligible to receive additional payment of annual claims for allowed costs that are incurred through December 31, 2025.  The proceeds reduced costs for dry cask storage.  As of December 31, 2025 and 2024, I&M deferred $25 million and $11 million, respectively, in Prepayments and Other Current Assets and $1 million and $15 million, respectively, in Deferred Charges and Other Noncurrent Assets on the balance sheets for dry cask storage and related operation and maintenance costs for recovery under this agreement. See “Fair Value Measurements of Trust Assets for Decommissioning and SNF Disposal” section of Note 11 for additional information.

Nuclear Insurance

I&M carries nuclear property insurance of $2.7 billion to cover a nuclear incident at Cook Plant including coverage for decontamination and stabilization, as well as premature decommissioning caused by a nuclear incident.  Insurance coverage for a nonnuclear property incident at Cook Plant is $1 billion.  Additional insurance provides coverage for a weekly indemnity payment resulting from an insured accidental outage.  I&M utilizes industry mutual insurers for the placement of this insurance coverage.  Coverage from these industry mutual insurance programs require a contingent financial obligation of up to $49 million for I&M’s current term, which is assessable if the insurer’s financial resources would be inadequate to pay for industry losses.

The Price-Anderson Act, extended through December 31, 2025, establishes insurance protection for public nuclear liability arising from a nuclear incident of $16.3 billion and applies to any incident at a licensed reactor in the U.S.  Commercially available insurance, which must be carried for each licensed reactor, provides $500 million of primary coverage.  In the event of a nuclear incident at any nuclear plant in the U.S., the remainder of the liability would be provided by a deferred premium assessment of $332 million per nuclear incident on Cook Plant’s reactors payable in annual installments of $49 million.  The number of incidents for which payments could be required is not limited.
In the event of an incident of a catastrophic nature, I&M is covered for public nuclear liability for the first $500 million through commercially available insurance.  The next level of liability coverage of up to $15.8 billion would be covered by deferred premium assessments made under the Price-Anderson Act. In the event nuclear losses or liabilities are underinsured or exceed accumulated funds, I&M would seek recovery of those amounts from customers through a rate increase. If recovery from customers is not possible, it could reduce future net income and cash flows and impact financial condition.

OPERATIONAL CONTINGENCIES

Insurance and Potential Losses

The Registrants maintain insurance coverage normal and customary for electric utilities, subject to various deductibles.  The Registrants also maintain property and casualty insurance that may cover certain physical damage or third-party injuries caused by cybersecurity incidents. Insurance coverage includes all risks of physical loss or damage to nonnuclear assets, subject to insurance policy conditions and exclusions.  Covered property generally includes power plants, substations, facilities and inventories.  Excluded property generally includes transmission and distribution lines, poles and towers.  The insurance programs also generally provide coverage against loss arising from certain claims made by third-parties and are in excess of retentions absorbed by the Registrants.  Coverage is generally provided by a combination of the protected cell of EIS and/or various industry mutual and/or commercial insurance carriers. See “Nuclear Contingencies” section above for additional information.

Some potential losses or liabilities may not be insurable or the amount of insurance carried may not be sufficient to meet potential losses and liabilities, including, but not limited to, liabilities relating to a cybersecurity incident, extreme weather or wildfire related liabilities or damage to the Cook Plant and costs of replacement power in the event of an incident at the Cook Plant.  Future losses or liabilities, if they occur, which are not completely insured, unless recovered through the ratemaking process, could reduce future net income and cash flows and impact financial condition.

Claims for Indemnification Made by Owners of the Gavin Power Station (Applies to AEP)

AEP sold the Gavin Power Station to Gavin Power LLC and Lighthouse Generation LLC in 2017. Pursuant to the PSA for that transaction, AEP maintained responsibility to complete closure of the 300 acre unlined fly ash reservoir (FAR) pond in accordance with the closure plan approved by the Ohio EPA and to indemnify the purchasers for that work. In July 2021, closure work was completed by AEP. In November 2022, the Federal EPA issued a final decision denying Gavin Power LLC’s requested extension to allow another pond at the Gavin Power Station, the CCR surface impoundment, to continue to receive CCR and non-CCR waste streams after April 11, 2021 until May 4, 2023 (the Gavin Denial). As part of the Gavin Denial, the Federal EPA made several assertions related to the CCR Rule, including an assertion that the closure of the FAR is noncompliant with the CCR Rule in multiple respects. The owners of the Gavin Power Station have notified AEP that they believe they are entitled to indemnification for any damages that may result from these claims, including any future enforcement or litigation resulting from any determinations of noncompliance by the Federal EPA with various aspects of the CCR Rule consistent with the Gavin Denial. The owners of the Gavin Power Station have also sought indemnification for landowner claims for property damage allegedly caused by modifications to the FAR. Management does not believe that the owners of the Gavin Power Station have any valid claim for indemnity or otherwise against AEP under the PSA. In January 2024, Gavin Power LLC filed a complaint with the United States District Court for the Southern District of Ohio, alleging various violations of the Administrative Procedure Act and asserting that the Federal EPA, through its prior inaction, has waived and is estopped from raising certain objections raised in the Gavin Denial. The complaint does not assert any claims against AEP. In August 2025, the District Court dismissed the complaint at the Federal EPA’s request. Based on the information currently available, management does not believe a loss is probable and cannot determine a range of potential losses, if any, that is reasonably possible of occurring.