REGULATORY ENVIRONMENT
9 Months Ended
Sep. 30, 2014
Regulated Operations [Abstract]  
REGULATORY ENVIRONMENT
Regulatory Environment

Wisconsin

2015 Rate Case

In April 2014, WPS filed an application with the PSCW to increase retail electric rates $76.8 million and to decrease natural gas rates $1.6 million, with rates expected to be effective January 1, 2015. WPS's request reflects a 10.60% return on common equity and a target common equity ratio of 50.51% in WPS's regulatory capital structure. In May 2014, WPS filed its proposed electric and natural gas rate designs with the PSCW. These rate designs include significantly higher fixed charges, which better matches the related fixed costs of providing service. The PSCW is reviewing the new rate design as part of the rate-setting process.

The proposed retail electric rate increase is primarily driven by the completion of a partial refund to customers of the 2013 fuel cost over-collections in 2014 rates, which kept rates flat in 2014, as well as a reduction in refunds associated with decoupling. In 2015, fuel and purchased power costs are expected to increase, as are transmission costs and general inflation. The proposed retail electric rate increase also includes WPS's request to recover deferred costs over four years related to the 2013 acquisition of the Fox Energy Center. Finally, capital costs associated with both previously approved environmental upgrades at the Columbia plant as well as our efforts to improve electric reliability by converting historically low performance overhead distribution lines to underground are also contributing to the requested increase in retail electric rates. The requested increase in retail electric rates was partially offset by a portion of the remaining 2013 fuel cost over-collections to customers. However, in July 2014, the PSCW authorized WPS to refund the remaining 2013 fuel cost over-collections to customers, all in 2014 rates, which differed from the original application to refund them in 2015 and 2016 rates.

The proposed retail natural gas rate decrease is driven by 2013 decoupling over-collections, which will be refunded to customers in 2015. An increase in non-fuel operating and maintenance costs, including the impact of general inflation, and an increase in return on equity partially offset the effect of the 2013 decoupling over-collections.

In August 2014, the PSCW staff submitted testimony and recommended a rate increase of $28.7 million for retail electric and a rate decrease of $13.6 million for retail natural gas, which reflected a 10.20% return on common equity. PSCW staff recommended a common equity ratio of 50.27% for WPS's regulatory capital structure. The PSCW held both technical and public hearings in September 2014. In October 2014, WPS issued an initial brief revising its requested retail electric rate increase to approximately $48 million. The requested retail natural gas rate decrease was also revised to a decrease of approximately $8 million. The revised request is lower than the initial application and is primarily driven by certain PSCW staff adjustments, but does not include adjustments for the contested issues of incentive compensation and the customer billing system project. The revised request reflects a 10.20% return on common equity and a common equity ratio of 50.27% in WPS's regulatory capital structure. A final decision by the PSCW on the 2015 rates is expected before December 31, 2014.

2014 Rates

In December 2013, the PSCW issued a final written order for WPS, effective January 1, 2014. It authorized a net retail electric rate decrease of $12.8 million and a net retail natural gas rate increase of $4.0 million, reflecting a 10.20% return on common equity. The order also included a common equity ratio of 50.14% in WPS's regulatory capital structure. The retail electric rate impact consisted of a rate increase, including recovery of the difference between the 2012 fuel refund and the 2013 rate increase discussed below, entirely offset by a portion of estimated fuel cost over-collections from customers in 2013. Retail electric rates were further decreased by 2012 decoupling over-collections to be returned to customers in 2014. The retail natural gas rate impact consisted of a rate decrease, which was more than offset by the positive impact of 2012 decoupling under-collections to be recovered from customers in 2014. Both the retail electric and retail natural gas rate changes included the recovery of pension and other employee benefit increases that were deferred in the 2013 rate case, as discussed below. The PSCW also authorized the recovery of prudently incurred 2014 environmental mitigation project costs related to compliance with a Consent Decree signed in January 2013 related to the Pulliam and Weston sites. See Note 13, Commitments and Contingencies, for more information. Additionally, the order required WPS to terminate its decoupling mechanism, beginning January 1, 2014.

2013 Rates

In December 2012, the PSCW issued a final written order for WPS, effective January 1, 2013. The order included a $28.5 million retail electric rate increase, partially offset by the 2012 fuel refund of $20.5 million. The difference between the 2012 fuel refund and the rate increase was deferred for recovery in 2014 rates. As a result, there was no change to customers' 2013 retail electric rates. The order also included a $3.4 million retail natural gas rate decrease. The order reflected a 10.30% return on common equity and a common equity ratio of 51.61% in WPS's regulatory capital structure. The rate changes included deferrals of $7.3 million for retail electric and $2.1 million for retail natural gas of pension and other employee benefit costs that are being recovered in 2014 rates. In addition, WPS was authorized recovery of $5.9 million related to income tax amounts previously expensed due to the Federal Health Care Reform Act. As a result, this amount was recorded as a regulatory asset in 2012, and recovery from customers began in 2013. The order also authorized the recovery of direct Cross State Air Pollution Rule costs incurred through the end of 2012. Lastly, the order authorized WPS to switch from production tax credits to Section 1603 Grants for the Crane Creek wind project.

A decoupling mechanism for natural gas and electric residential and small commercial and industrial customers was approved on a pilot basis as part of the order. The mechanism was based on total rate case-approved margins, rather than being calculated on a per-customer basis. The mechanism did not cover all customer classes, and it included an annual $14.0 million cap for electric service and an annual $8.0 million cap for natural gas service. Amounts recoverable from or refundable to customers were subject to these caps.

Michigan

2015 WPS Rate Case

In October 2014, WPS filed an application with the MPSC to increase retail electric rates $5.7 million, with interim rates expected to be effective in April 2015. WPS's request reflects a 10.60% return on common equity and a target common equity ratio of 50.48% in WPS's regulatory capital structure. The proposed retail electric rate increase is primarily driven by the 2013 acquisition of the Fox Energy Center as well as other capital investments associated with the Crane Creek wind farm and environmental upgrades at generating plants. Expenses are expected to increase for line clearance, customer relations, uncollectible expenses, injuries and damages, and general inflation. The proposal includes annual rate increases to be implemented over a three-year period.

2014 MGU Rates

In November 2013, the MPSC issued a final written order for MGU, effective January 1, 2014. The order authorized a retail natural gas rate increase of $4.5 million. The rates reflect a 10.25% return on common equity and a common equity ratio of 48.62% in MGU's regulatory capital structure. Additionally, the order required MGU to terminate its decoupling mechanism after December 31, 2013, and replace it with a new decoupling mechanism based on total margins, beginning January 1, 2015. The new decoupling mechanism does not cover variations in volumes due to actual weather being different from rate case-assumed weather. The rate order also terminated MGU's existing uncollectible expense true-up mechanism after December 31, 2013.

MGU Depreciation Case

In January 2013, the Michigan Court of Appeals issued an order reversing the MPSC's 2010 disallowance of $2.5 million associated with the early retirement of certain MGU assets. As a result, a $2.5 million reduction to depreciation expense was recorded in the first quarter of 2013. In June 2013, the MPSC issued an order related to MGU's most recent depreciation case. This order also approved a settlement agreement reflecting recovery of these previously disallowed costs.

2014 UPPCO Rates

In December 2013, the MPSC issued a final written order for UPPCO, effective January 1, 2014. The order authorized a retail electric rate increase of $5.8 million. The rates reflected a 10.15% return on common equity and a common equity ratio of 56.74% in UPPCO's regulatory capital structure. The order required UPPCO to terminate its existing decoupling mechanism after December 31, 2013. In addition, the order required UPPCO to achieve certain minimum line clearance performance metrics for recovery of costs related to clearing trees and other natural obstructions away from power lines.
 
Illinois

2015 Rate Cases

In February 2014, PGL and NSG filed applications with the ICC to increase retail natural gas rates $128.9 million and $7.1 million, respectively, with rates expected to be effective in early 2015. Both PGL's and NSG's requests reflect a 10.25% return on common equity. The requests reflect target common equity ratios of 50.31% for PGL and 50.41% for NSG in their respective regulatory capital structures. The proposed retail natural gas rate increases are primarily driven by increased capital investments, in particular for main replacement, a loss in revenues as a result of lower projected sales volumes, increased costs of debt and common equity, and increased operating expenses. The increase in operating expenses relates to pipeline safety and other compliance work, a general wage increase, higher depreciation costs, and higher invested capital taxes. PGL's application also removes from the proposed 2015 rates the investment and related expenses that PGL plans to recover through its new Qualifying Infrastructure Plant rider, as discussed below. PGL and NSG proposed no changes to the continued use of their decoupling mechanisms and uncollectible expense true-up mechanisms.

In October 2014, PGL and NSG filed their initial briefs and maintained their rate increase requests of $100.5 million and $6.5 million, respectively, as updated in their rebuttal and surrebutal testimony given in August and September 2014. Both PGL's and NSG's requests reflect a 10.25% return on common equity. Common equity ratios were also revised to 50.33% for PGL and 50.48% for NSG. The revised requests were primarily driven by updated capital investment amounts, including main replacement for PGL; certain updated pension and employee benefit costs based on a recent actuarial study; and adjustments for uncontested operating expenses.

The ICC staff and intervenors filed their initial briefs in October 2014. The ICC staff recommended rate increases of $71.1 million and $3.5 million for PGL and NSG, respectively, which reflected a 9.00% return on common equity for both companies. The intervenors recommended a rate increase of $45.5 million for PGL and a rate decrease of $1.0 million for NSG, which reflected a 9.15% return on common equity for both companies. Staff and intervenors both recommended a common equity ratio of 50.33% for PGL and 50.48% for NSG in their respective regulatory capital structures. A final decision on the 2015 rates is expected by the ICC in January of 2015.

Qualifying Infrastructure Plant Rider

In July 2013, Illinois Public Act 98-0057 (formerly Senate Bill 2266), The Natural Gas Consumer, Safety & Reliability Act, became law. The Act gives PGL a recovery mechanism for prudently incurred costs to upgrade Illinois natural gas infrastructure that will be collected through a surcharge on customer bills. This Act eliminated a requirement for PGL and NSG to file biennial rate proceedings under existing Illinois coal-to-gas legislation. In September 2013, PGL filed with the ICC requesting the proposed rider, which was approved in January 2014. The rider became effective on January 1, 2014.

2013 Rates

In June 2013, the ICC issued a final written order for PGL and NSG, effective June 27, 2013. The order authorized a retail natural gas rate increase of $57.2 million for PGL and $6.6 million for NSG. The rates for PGL reflected a 9.28% return on common equity and a common equity ratio of 50.43% in PGL's regulatory capital structure. The rates for NSG reflected a 9.28% return on common equity and a common equity ratio of 50.32% in NSG's regulatory capital structure. The rate order also allowed PGL and NSG to continue the use of their decoupling mechanisms, as affirmed by the Illinois Appellate Court (Court). In addition, the ICC is required to conduct an investigation to monitor the costs and progress of the accelerated natural gas main replacement program.

In August 2013, the ICC granted certain rehearing requests on tax-related issues filed by PGL, NSG, and other intervenors. PGL and NSG asked for a correction of the revenue requirement for deferred tax assets related to tax net operating losses (NOLs) incurred in 2012 and 2013. In the ICC’s order, these deferred tax assets were included in rate base, but computational errors were made. Other intervenors requested the exclusion from rate base of the deferred tax asset related to the 2012 tax NOL. The tax NOLs in question resulted from PGL and NSG claiming accelerated depreciation deductions in 2012 and 2013. In December 2013, the ICC evaluated and approved a correction of the computational errors and rejected the intervenors' proposed exclusion of the 2012 tax NOL. Customer rates were increased by $2.6 million for PGL and $0.1 million for NSG for the impact of this correction, effective January 1, 2014. In January 2014, the Illinois Attorney General and Citizens Utility Board each filed an appeal with the Court, and briefing is in progress.

2012 Decoupling

The ICC issued a final written order, effective January 21, 2012, which approved permanent decoupling mechanisms for PGL and NSG. The Illinois Attorney General and Citizens Utility Board appealed to the Court the ICC's authority to approve PGL's and NSG's decoupling mechanisms and filed a motion to stay the implementation of the permanent decoupling mechanism or make collections subject to refund. In May 2012, the ICC issued a revised amendatory order granting the Illinois Attorney General's motion to make revenues collected under the permanent decoupling mechanism subject to refund and directing PGL and NSG to track amounts that would be due to customers or the companies from the permanent decoupling mechanisms. Refunds would have been required if the Court found that the ICC did not have authority to approve decoupling and ordered a refund. As a result, the recovery of amounts related to decoupling in 2012 was uncertain, and PGL and NSG established offsetting reserves equal to decoupling amounts accrued. In March 2013, the Court issued an opinion that affirmed the ICC's order approving the permanent decoupling mechanism. As a result, the reserves recorded in 2012 were reversed in the first quarter of 2013. PGL's and NSG's permanent decoupling mechanism was in place for 2013. In June 2013, the Illinois Attorney General and Citizens Utility Board petitioned the Illinois Supreme Court to review the Court's decision. The Illinois Supreme Court granted the request in September 2013, and oral arguments were heard in September 2014. The Illinois Supreme Court has no deadline by which it must issue its decision. Decoupling amounts recorded in 2012 were fully recovered and amounts in 2013 are being refunded to customers in 2014. Decoupling amounts in 2014 will continue to be accrued, absent an adverse Illinois Supreme Court decision.

Minnesota

2014 Rates

In October 2014, the MPUC issued a final written order, which is expected to be effective in the first half of 2015. The order authorized a retail natural gas rate increase of $7.6 million. The rates reflected a 9.35% return on common equity and a common equity ratio of 50.31% in MERC's regulatory capital structure. The order allows for a deferral of customer billing system costs, for which the recovery will be requested in a future rate case. A decoupling mechanism with a 10% cap will remain in effect for MERC's residential and small commercial and industrial customers. The final approved rate increase was lower than the interim rates collected from customers during 2014. Therefore, as of September 30, 2014, $2.3 million is estimated to be refunded to customers during 2015.

2011 Rates Finalized in 2013

In July 2012, the MPUC approved a final written order, effective January 1, 2013. The order authorized a retail natural gas rate increase of $11.0 million. The rates reflected a 9.70% return on common equity and a common equity ratio of 50.48% in MERC's regulatory capital structure. In addition, the order set recovery of MERC's 2011 test-year pension expense at 2010 levels. The MPUC also approved a decoupling mechanism for MERC that covers residential and small commercial and industrial customers on a three-year trial basis, effective January 1, 2013. The decoupling mechanism does not adjust for variations in volumes resulting from changes in customer count compared to rate case levels. It includes an annual 10% cap based on distribution revenues approved in the rate case. Amounts recoverable from or refundable to customers are subject to this cap.