XML 41 R109.htm IDEA: XBRL DOCUMENT v2.4.0.8
COMMITMENTS AND CONTINGENCIES (Details 2) (USD $)
In Millions, unless otherwise specified
12 Months Ended 1 Months Ended
Dec. 31, 2013
Manufactured Gas Plant Remediation
Natural Gas Utility
site
Mar. 31, 2013
WPS
Weston and Pulliam Plants
Electric Utility
Jun. 30, 2013
WPS
Columbia And Edgewater
Electric Utility
Dec. 31, 2013
WPS
Mercury emission
Electric Utility
MW
Air Permitting Violation Claims        
Beneficial environmental project amount   $ 6.0 $ 1.3  
Civil penalty and/or legal fees   1.2 0.4  
Mercury and Interstate Air Quality Rules        
Percentage mercury reduction required by the State of Wisconsin's mercury rule through 2014       40.00%
Level of electric generating units above which a 90% reduction in mercury emissions is required by 2015 (in MW)       150
Percentage mercury reduction by 2015, required by the State of Wisconsin's mercury rule, for electric generating units above 150 MW       90.00%
Level of electric generating units above which a reduction in mercury emissions is required by the Best Available Control Technology rule (in MW)       25
Highest level of electric generating units for which a reduction in mercury emissions is required by the Best Available Control Technology rule (in MW)       150
Estimated capital cost to achieve required emission reduction       8
Manufactured Gas Plant Remediation        
Number of environmental remediation sites 53      
Number of environmental remediation sites transferred to the EPA Superfund Alternative Sites Program 20      
Estimated and accrued future undiscounted investigation and cleanup costs for all sites 599.7      
Cash expenditures for environmental remediation not yet recovered in rates 49.3      
Regulatory assets recorded for cash and estimated future remediation expenditures, net of insurance recoveries received 649.0      
Insurance recoveries received $ 65.2