EX-96.2 12 tm2311827d1_ex96-2.htm EXHIBIT 96.2

 

Exhibit 96.2

 

 

 

TECHNICAL REPORT SUMMARY OF THE NUEVA VICTORIA OPERATION YEAR 2022
 
Date: March 2024

 

SQM TRS Nueva Victoria 

 

 

 

Summary

  

This report provides the methodology, procedures and classification used to obtain SQM’s Nitrate an Iodine Mineral Resources and Mineral Reserves, at the Nueva Victoria Site. The Mineral Resources and Reserves that are delivered correspond to the update as of December 31, 2022.

 

The results obtained are summarized in the following tables:

 

Mining Total Inferred Resource Total Indicated Resource Total Measured Resource

Tonnage

(Mt)

Nitrate grade

(%)

Iodine grade

(ppm)

Tonnage

(Mt)

Nitrate grade

(%)

Iodine grade

(ppm)

Tonnage

(Mt)

Nitrate grade

(%)

Iodine grade

(ppm)

Nueva Victoria 31.1 6.5 343 573 6 460 219.5 5.9 441

 

Mineral Resources 2022

 

Mining

Proven Reserves (1)

 

(million metric tons)

 

Average grade Nitrate

 

(Percentage by weight)

Average grade Iodine

 

(Parts per million)

Average Cut-off

 

grade for the Mine

 

(2)

         

Nueva Victoria

219.5 5.9% 441 Nitrate 3.0 %
         
 

Probable Reserves

 

(million metric tons)

Average grade Nitrate

 

(Percentage by weight)

Average grade Iodine

 

(Parts per million)

Average Cut-off

 

grade for the Mine (2)

         

Sector

 

Nueva Victoria

553 5.1% 415 Nitrate 3.0 %

 

(1)The above tables show the Proven Reserves before losses related to the exploitation and treatment of the ore. Proven Reserves are affected by mining methods, resulting in differences between the estimated reserves that are available for exploitation in the mining plan and the recoverable material that is ultimately transferred to the leaching heaps. The average mining factor for each of our mines varies between 80% and 90%, while the average global metallurgical recovery of nitrate an iodine processes contained in the recovered material varies between 55% and 70%.

 

(2)The cut-off grade of the Proven and Probable Reserves vary according to the objectives required in the different mines. The assigned values correspond to the averages of the different sectors.

 

SQM TRS Nueva Victoria 

 

 

 

Table of contents

 

1 executive summary 1
1.1 Property Summary and Ownership 1
1.2 Geology and Mineralization 1
1.3 Mineral Resource Statement 2
1.4 Mineral Reserve Statement 3
1.5 Mine Design and Scheduling 5
1.6 Metallurgy and Mineral Processing 6
1.6.1 Metallurgical Testing Summary 6
1.6.2 Mining and Mineral Processing Summary 6
1.7 Capital and Operating Costs 7
1.8 Economic Analysis 7
1.9 Conclusions and Recommendations 8
2 introduction 9
2.1 Terms of Reference and Purpose of the Report 9
2.2 Source of Data and Information 9
2.3 Details of Inspection 13
2.4 Previous Reports On Project 13
3 description and location 14
3.1 Location 14
3.2 Mineral Titles, Claims, Rights, Leases and Options 15
3.3 Mineral Rights 15
3.4 Environmental Impacts and Permitting 16
3.5 Other Significant Factors and Risks 16
3.6 Royalties and Agreements 16
4 accessibility, climate, local resources, infrastructure and physiography 17
4.1 Topography 17
4.2 Vegetation 19
4.3 Access to the Property 19
4.4 Climate and Length of Operating Season 19
4.5 Infrastructure 20

 

SQM TRS Nueva Victoria 

 

 

 

5 history 21
6 geological setting, mineralization and deposit 22
6.1 Regional Geological Setting 22
6.2 Local Geology 24
6.2.1 Intrusive Igneous Rocks 24
6.2.2 Volcanic and Marine Sedimentary Sequences 24
6.2.3 Stratified Sedimentary and Volcaniclastic Rocks 24
6.3 Property Geology 27
6.3.1 Unit A 27
6.3.2 Unit B 27
6.3.3 Unit C 27
6.3.4 Unit D 27
6.3.5 Unit E 28
6.3.6 Unit F 28
6.3.7 Tente En El Aire (tea) 30
6.3.8 Torcaza 32
6.3.9 Hermosa 33
6.3.10 West Mine 34
6.3.11 North Mine 34
6.3.12 South Mine 37
6.4 Mineralization 37
6.5 Deposit Types 39
6.5.1 Genesis of Caliche Deposits 39
6.5.2 Nueva Victoria 39
6.5.3 Continuous Mantles 40
6.5.4 Thin Salt Crusts and Superficial Caliche 40
6.5.5 Stacked Caliches 40
6.5.6 Other Economic Mineralization 40
7 exploration 42
7.1 Surface Samples 42
7.2 Topographic Survey 42
7.3 Drilling Methods and Results 43
7.3.1 Grid > 400 M 45
7.3.2 400 M Grid 45
7.3.3 200m and 100m Grid 45
7.3.4 100t and 50m Grid 45
7.3.5 2022 Campaigns 50
7.3.6 Exploration Drill Sample Recovery 50
7.3.7 Exploration Drill Hole Logging 51
7.3.8 Exploration Drill Hole Location of Data Points 52
7.3.9 Qualified Person’s Statement On Exploration Drilling 52

 

SQM TRS Nueva Victoria 

 

 

 

8 sample preparation, analysis and security 53
8.1 Site Sample Preparation Methods and Security 53
8.1.1 Rc Drilling 53
8.1.2 Sample Preparation 55
8.2 Laboratories, Assaying and Analytical Procedures 57
8.3 Results, Qc Procedures and Qa Actions 57
8.3.1 Laboratory Quality Control 57
8.3.2 Quality Control and Quality Assurance Programs (qa-qc) 58
8.3.3 Sample Security 67
8.4 Opinion of Adequacy 75
9 data verification 76
9.1 Procedures 76
9.2 Data Management 76
9.3 Technical Procedures 76
9.4 Quality Control Procedures 76
9.5 Precision Evaluation 76
9.6 Accuracy Evaluation 77
9.7 Qualified Person’s Opinion of Data Adequacy 77
10 mineral processing and metallurgical testing 78
10.1 Historical Development of Metallurgical Tests 78
10.2 Metallurgical Testing 80
10.2.1 Sample Preparation 81
10.2.2 Caliche Mineralogical and Chemical Characterization 84
10.2.3 Caliche Nitrate and Iodine Grade Determination 85
10.2.4 Caliche Physical Properties 87
10.2.5 Agitated Leaching Tests 89
10.2.6 Column Leach Test Using Sea Water 92
10.2.7 Laboratory Control Procedures 94
10.3 Samples Representativeness 95
10.4 Analytical and Testing Laboratories 96
10.5 Testing and Relevant Results 97
10.5.1 Metallurgical Recovery Estimation 97
10.5.2 Irrigation Strategy Selection 99
10.5.3 Industrial Scale Yield Estimation 100
10.5.4 Piloting Campaigns 104
10.6 Significant Risk Factors 108
10.7 Qualified Person’S opinion 108
10.7.1 Physical and Chemical Characterization 108
10.7.2 Chemical – Metallurgical Tests 108
10.7.3 Innovation and Development 109

 

SQM TRS Nueva Victoria 

 

 

 

11 mineral resource estimate 110
11.1 Key Assumptions, Parameters and Methods 110
11.1.1 Sample Database 110
11.1.2 Geological Domains and Modeling 111
11.1.3 Assay Compositing 111
11.1.4 Evaluation of Outlier Grades, Cut-offs, and Grade Capping 111
11.1.5 Specific Gravity (sg) 111
11.1.6 Block Model Mineral Resource Evaluation 112
11.1.7 Global Statistics 117
11.2 Mineral Resource Estimate 131
11.3 Mineral Resource Classification 132
11.4 Mineral Resource Uncertainty Discussion 132
11.5 Assumptions for Multiple Commodity Mineral Resource Estimate 133
11.6 Qualified Person’s Opinion On Factors That are Likely to Influence the Prospect of Economic Extraction 133
12 mineral reserve estimate 134
12.1 Estimation Methods, Parameters and Methods 134
12.2 Cut-off Grade 138
12.3 Classification and Criteria 138
12.4 Mineral Reserves 139

 

SQM TRS Nueva Victoria 

 

 

 

13 mining methods 143
13.1 Geotechnical and Hydrological Models, and Other Parameters Relevant to Mine Designs and Plans 144
13.2 Production Rates, Expected Mine Life, Mining Unit Dimensions, and Mining Dilution and Recovery Factors 148
13.3 Production and Final Mine Outline 153
13.4 Requirements for Stripping, Underground Development, and Backfilling 156
13.5 Required Mining Equipment Fleet and Personnel 158
14 processing and recovery methods 159
14.1 Process Overview 161
14.1.1 Mine Area and Com (Operation Centers) 163
14.1.2 Heap Leaching 163
14.1.3 Iodide-Iodine Production 169
14.1.4 Neutralization Plant 170
14.1.5 Solar Evaporation Ponds 170
14.1.6 Sur Viejo Nitrate Plant (Planned) 174
14.2 Production Specifications and Efficiencies 174
14.2.1 Process Criteria 174
14.2.2 Solar Pond Specifications 175
14.2.3 Production Balance and Yields 176
14.3 Process Requirements 178
14.3.1 Energy and Fuel Requirements 180
14.3.2 Water Supply and Consumption 181
14.3.3 Staffing Requirements 184
14.3.4 Process Plant Consumables 185
14.3.5 Air Supply 188
14.4 Qualified Person´s Opinion 188
15 project infrastructure 189
15.1 Access to Production, Storage and Port Loading Areas 194
15.2 Production Areas and Infrastructure 195
15.3 Communications 203
15.4 Water Supply 204
15.5 Water Treatment 204
15.6 Power Supply 205

 

SQM TRS Nueva Victoria 

 

 

 

16 market studies 206
16.1 The Company 206
16.2 Iodine and Its Derivatives, Market, Competition, Products, Customers 207
16.2.1 Iodine Market 208
16.2.2 Iodine Products 209
16.2.3 Iodine: Marketing and Customers 211
16.2.4 Iodine Competition 211
16.3 Nitrates 213
16.3.1 Specialty Plant Nutrition, Market, Competition, Products, Customers 215
16.3.2 Industrial Chemicals, Market, Competition, Products, Customers 220
17 environmental studies, permitting and social or community impact 224
17.1 Environmental Studies 224
17.1.1 Baseline Studies 225
17.1.2 Environmental Impact Study 232
17.2 Operating and Post Closure Requirements and Plans 236
17.2.1 Waste Disposal Requirements and Plans 236
17.2.2 Monitoring and Management Plan Established in the Environmental Authorization 237
17.2.3 Requirements and Plans for Water Management During Operations and After Closure 238
17.3 Environmental and Sectorial Permits Status 239
17.4 Social and Community 241
17.4.1 Plans, Negotiations or Agreements with Individuals or Local Groups 241
17.4.2 Purchasing Commitments or Local Contracting 243
17.4.3 Social Risk Matrix 243
17.5 Mine Closure 244
17.5.1 Closure, Remediation, and Reclamation Plans 244
17.5.2 Closure Costs 247
18 capital and operating costs 249
18.1 Capital Costs 249
18.1.1 Caliche Mining 250
18.1.2 Heap Leaching 250
18.1.3 Iodide and Iodine Plants 250
18.1.4 Solar Evaporation Ponds 250
18.1.5 Water Resources 250
18.1.6 Electrical Distribution System 250
18.1.7 General Facilities 251
18.2 Future Investment 251
18.3 Operating Cost 252

 

SQM TRS Nueva Victoria 

 

 

 

19 economic analysis 253
19.1 Principal Assumptions 253
19.2 Production and Sales 253
19.3 Prices and Revenue 253
19.4 Operating Costs 256
19.5 Capital Expenditure 258
19.6 Cashflow Forecast 258
19.7 Sensitivity Analysis 260
20 adjacent properties 261
21 other relevant data and information 263
22 interpretation and conclusions 264
22.1 Results 265
22.1.1 Geology and Mineral Resources 265
22.1.2 Mining and Mineral Reserves 265
22.1.3 Metallurgy and Mineral Processing 265
22.2 Risks 267
22.2.1 Mining and Mineral Reserves 267
22.2.2 Metallurgy and Mineral Processing 267
22.2.3 Other Risks 267
22.3 Significant Opportunities 267
22.3.1 Geology and Mineral Resources 267
22.3.2 Mining and Mineral Reserves 267
22.3.3 Metallurgy and Mineral Processing 268
23 recommendations 269
23.1 Geology and Mineral Resources 269
23.2 Mining and Mineral Reserves 269
23.3 Metallurgy and Mineral Processing 269
24 References 271
25 Reliance On Information Provided by Registrant 272

 

SQM TRS Nueva Victoria 

 

 

 

TABLES

 

Table 1-1. In-Situ Mineral Resource Estimate, Exclusive of Mineral Reserves, effective December 31, 2022 2
   
Table 1-2. Mineral Reserve at the Nueva Victoria Mine (Effective 31 December 2022) 4
   
Table 2-1. Summary of site visits made by QPs to Nueva Victoria in support of TRS Review 9
   
Table 4-1. Slope Categories applied in the analysis of the ASTER DEM 17
   
Table 6-1. Mineralogy of Nueva Victoria Caliches 38
   
Table 7-1. Detail of the Number of Drill Holes and Total Meters Drilled by sector in Nueva Victoria, Iris and Soronal Properties 43
   
Table 7-2. Meters Drilled in Campaigns 2022 50
   
Table 7-3. Campaigns 2022 Average NANO3 and I2 50
   
Table 7-4. Recovery Percentages at Nueva Victoria by Sectors 51
   
Table 8-1. Number of Control Samples for Campaigns from 2017 to 2022 for Nueva Victoria Sectors 59
   
Table 8-2. Coarse Duplicates for Nitrate TEA 2017 60
   
Table 8-3. Coarse Duplicates for Iodine-TEA 2017 61
   
Table 8-4. Coarse Duplicates for Iodine and Nitrate TEA 2018-2019 62
   
Table 8-5. Standards Results - TEA 2018-2019 64
   
Table 8-6. Fine Duplicates for Iodine-and Nitrate TEA 2018-2019 64
   
Table 8-7 Coarse Duplicate for Nitrate and Iodine Hermosa 2019 66
   
Table 10-1. Methodologies of the Test Plan Initially Developed for the Study of Caliche Behavior 79
   
Table 10-2. Applied Methods for the Characterization of Caliche or Composite 84
   
Table 10-3. Determination of Physical Properties of Caliche Minerals 87
   
Table 10-4 Comparative Results of Physical Tests for Pampa Orcoma and TEA Exploitation Project 88

 

SQM TRS Nueva Victoria 

 

 

 

Table 10-5 Chemical Characterization of Samples Obtained from TEA and Successive Leach Test Results 90
   
Table 10-6 Conditions for Leaching Experiments with Seawater 92
   
Table 10-7 List of Requested Analyses for Caliche Leach Brines and Iodine Prill 94
   
Table 10-8 List of Installations Available for Analysis 96
   
Table 10-9 Comparison of the Composition Determined for the 583 Heap Leaching Pile in Operation at Nueva Victoria 101
   
Table 10-10 Comparison of Industrial Yield with the Values Predicted by the Model 103
   
Table 10-11 Condition for Leaching Experiments in Isocontainer 106
   
Table 11-1. Basic Sample Statistics for Iodine and Nitrate in Nueva Victoria 110
   
Table 11-2. Specific Gravity Samples in Nueva Victoria 111
   
Table 11-3. Block Model Dimensions 112
   
Table 11-4. Variogram Models for Iodine and Nitrate in Nueva Victoria 114
   
Table 11-5. Sample Selection for each sector 116
   
Table 11-6. Global Statistics comparison for Iodine 117
   
Table 11-7. Global Statistics comparison for Nitrate 117
   
Table 11-8. Economic and Operational Parameters Used to Define Economic Intervals for each Drill Hole in Nueva Victoria 130
   
Table 11-9. Example of the database evaluation in Hermosa, Nueva Victoria  
   
Table 11-10. Mineral Resource Estimate, Exclusive of Mineral Reserves, as December 31, 2022 131
   
Table 12-1. Results of 3D Block Model Reconciliations 136
   
Table 12-2 Resources to Reserves Conversion Factors at the Nueva Victoria Mine 140
   
Table 12-3 Mineral Reserves at the Nueva Victoria Mine (Effective 31 December 2022) 141
   
Table 12-4 Reserves at the Nueva Victoria Mine by Sector (Effective 31 December 2022) 142
   
Table 13-1. Summary of Nueva Victoria-SQM caliche mine characteristics 144

 

SQM TRS Nueva Victoria 

 

 

 

Table 13-2. Summary Results of Slope Stability Analysis of Closed Heap Leaching (Nueva Victoria) 147
   
Table 13-3. Mining Plan (2023-2040) 149
   
Table 13-4. Mine and Pad Leaching Production for Nueva Victoria Mine Period 2023 – 2040 155
   
Table 13-5 Blasting Pattern in Nueva Victoria Mine 156
   
Table 13-6 Equipment Fleet at Nueva Victoria mine 158
   
Table 14-1 Modifications to the Operation with Expansion of the TEA Project 162
   
Table 14-2 Solar Evaporation Pond Types at Sur Viejo 170
   
Table 14-3 Solar Evaporation Pond Types at TEA Project 171
   
Table 14-4 Summary of process criteria. Mine site caliche heap leaching and productive iodine process 174
   
Table 14-5 Description of Inflows and Outflows of the Solar Evaporation System 175
   
Table 14-6 Summary of 2022 Iodine and Nitrate at Nueva Victoria, Including Iris 176
   
Table 14-7 Nueva Victoria Production Data for 2019 to 2022 177
   
Table 14-8 Nueva Victoria Process Plant Production Summary 178
   
Table 14-9 Historic Rates of Groundwater Extraction for Industrial Water Supply 182
   
Table 14-10 Nueva Victoria Industrial and Potable Water Consumption 183
   
Table 14-11 Personnel Required by Operational Activity 185
   
Table 14-12 Process Reagents and Consumption Rates per Year, NV 186
   
Table 14-13 Process Reagents and Consumption Rates per year with Nitrate Plant (Planned) 187
   
Table 15-1. Approved Water Rights, by Sector 204
   
Table 15-2. Average Water Extraction, by Sector 204
   
Table 16-1 Percentage Breakdown of SQM's Revenues for 2021, 2020, 2019 and 2018 207
   
Table 16-2 Iodine and derivates volumes and revenues, 2018 - 2021 210
   
Table 16-3 Geographical Breakdown of the Revenues 211
   
Table 16-4 Sales Volumes and Revenue for Specialty Plant Nutrients, 2021, 2020, 2019, 2018 218

 

SQM TRS Nueva Victoria 

 

 

 

Table 16-5 Geographical Breakdown of the Sales 219
   
Table 16-6 Sales Volumes of Industrial Chemicals and Total Revenues for 2021, 2020, 2019 and 2018 222
   
Table 16-7 Geographical Breakdown of the Revenues 222
   
Table 17-1. Environmental Impacts of the Pampa Hermosa Project and Committed Measures 233
   
Table 17-2. Environmental Impacts of the Tente en el Aire Project and Committed Measures 235
   
Table 17-3. Monthly Average Flow Period 2022 Nueva Victoria 238
   
Table 17-4. Distribution of Freshwater Consumption Between the Various Components of the Nueva Victoria Operation 238
   
Table 17-5. Sectorial Permits Defined in the Environmental Resolutions 240
   
Table 17-6. Risk Assessment of the Main Facilities at the Nueva Victoria and TEA Project Mine 246
   
Table 17-7. Nueva Victoria Mine Site Closure Costs 247
   
Table 17-8. Nueva Victoria Mining Site Post-Closure Costs 247
   
Table 18-1. Summary of Capital Expenses for the Nueva Victoria an Iris Operations 249
   
Table 18-2 Estimated Investment 251
   
Table 18-3 Nueva Victoria Operating Cost 252
   
Table 19-1. Nueva Victoria Long Term of Mine Production 254
   
Table 19-2. Nueva Victoria Iodine and Nitrate Price and Revenues 255
   
Table 19-3. Nueva Victoria Operating Costs 257
   
Table 19-4. Estimated Net Present Value (NPV) for the Period 259
   
Figures  
   
Figure 3-1. General Location Map 14
   
Figure 3-2. Location of Nueva Victoria Project 15
   
Figure 4-1. Slope parameter map Sr and elevation profile trace AA" 18
   
Figure 6-1. Geomorphological scheme of saline deposits in northern Chile 22
   
Figure 6-2. Geological map at Nueva Victoria. Internal document-SQM 25

 

SQM TRS Nueva Victoria 

 

 

 

Figure 6-3. Typical profile of the Qcp unit at Nueva Victoria 28
   
Figure 6-4. Nueva Victoria Sectors 29
   
Figure 6-5. Schematic Cross section of TEA Deposit 31
   
Figure 6-6. Stratigraphic Cross Section of Torcaza sector 32
   
Figure 6-7. Stratigraphic Column and Schematic cross section of Hermosa Sector 33
   
Figure 6-8. Schematic Cross section of West Mine Sector 35
   
Figure 6-9. Schematic Cross Section of North Mine Sector 36
   
Figure 7-1. Wingtra One Fixed-Wing Aircraft 42
   
Figure 7-2. Drill hole location map 44
   
Figure 7-3. Iso-Nitrate Map Nueva Victoria of North and South Mine Sector 46
   
Figure 7-4. Iso-Nitrate Map Nueva Victoria West Mine Sector 47
   
Figure 7-5. Iso-Iodine Map Nueva Victoria; TEA and Hermosa Sector 48
   
Figure 7-6. Iso-Iodine Map Nueva Victoria TEA en Torcaza sector 49
   
Figure 8-1. A) Drilling Point Marking B) Drill Rig Positioning C) RC Drilling D) RC Samples at Platform 53
   
Figure 8-2. A) Transportation Truck. B) Pallets with RC Samples 54
   
Figure 8-3. Sample Preparation Flow Diagram 56
   
Figure 8-4. A) Sample Division B) Cone Crusher C) Riffle Cutter D) Sample Pulverizing E) Packaging 56
   
Figure 8-5. Flow Chart for Approval of Laboratory Chemical Analysis Results 58
   
Figure 8-6. Scatterplot for Nitrate - Coarse Duplicates- TEA 2017 60
   
Figure 8-7. Plots for Iodine - Coarse Duplicates TEA 2017 62
   
Figure 8-8. Plots for Iodine and Nitrate - Coarse Duplicates- TEA 2018-2019 63
   
Figure 8-9. Plots for Nitrate and Iodine Fine Duplicates TEA 2018-2019 65
   
Figure 8-10. Plot Cumulative Absolute Difference for Nitrate and Iodine Fine Duplicates TEA 2018- 2019 65
   
Figure 8-11. Plot for Nitrate Coarse Duplicate Hermosa 2019 66
   
Figure 8-12. A) Samples Storage B) Drill Hole and Samples Labeling 74
   
Figure 8-13. Iris – TEA Warehouse at Nueva Victoria 75

 

SQM TRS Nueva Victoria 

 

 

 

Figure 10-9. Iodine Recovery as a Function of total Salts Content 98
   
Figure 10-10. Parameter Scales and Irrigation Strategy in the Impregnation Stage 100
   
Figure 10-11. Irrigation Strategy Selection 101
   
Figure 10-12. Nitrate and Iodine Yield Estimation and Industrial Correlation for the period 2008-2022 102
   
Figure 10-13. Nitrate and Iodine Yield Extraction and Dissolutions of Salts 103
   
Figure 10-14. Nitrate and Iodine Yield Extraction based on Unit Consumption and Purge Factor 104
   
Figure 10-15. Loaded Isocontainer and Distribution of Material by Particle Size 105
   
Figure 10-16. Pile Curve 361 and 362 vs Average Pilot Curve for TR 1,5 L/h-m3 TEA Pilot Campaign 107
   
Figure 11-2. Variogram Models for Iodine and Nitrate in Nueva Victoria 115
   
Figure 11-3. Plan View of the Polygons Bordering The Mineral Resources Hermosa 116
   
Figure 11-4. Swath Plots for Iodine TEA 119
   
Figure 11-5. Swath Plots for Nitrate TEA 120
   
Commentaries 121
   
Figure 11-6. Swath Plots for Iodine Hermosa 122
   
Commentaries 124
   
Figure 11-8. Swath Plots for Iodine Torcaza 125
   
Figure 11-9. Swath Plots for Nitrate Torcaza 126
   
Commentaries 127
   
Figure 11-11. Visual Validation of Iodine a Estimation, Plan View Hermosa 129
   
Figure 11-12. Visual Validation of Nitrate Estimation, Plan View Torcaza 129
   
Figure 12-2 Map of Reserves Sectors in Nueva Victoria 137
   
Figure 13-1. Stratigraphic Column and Schematic Profile, and Schematic Mining Process in Nueva Victoria Caliche Mine 145
   
Figure 13-2. Geotechnical Analysis Results: Heap #300, Hypothesis Maximum Credible Earthquake 147
   
Heap leach pads (Figure 13-3) are built to accumulate a total of 1 Mt, with heights between 7 to 15 m and crown area of 65.000 m2 151

 

SQM TRS Nueva Victoria 

 

 

 

Figure 13-3. Pad Construction and Morphology in Nueva Victoria Mine (caliches) 151
   
Figure 13-4. Final Mine Outline - Nueva Victoria Mining Plan 2023-2040 154
   
Figure 13-5. Typical Blast in Nueva Victoria Mine (caliches) 157
   
Figure 13-6. Terrain Leveler and SME equipment (Vermeer) 157
   
Figure 14-1. Simplified Nueva Victoria Process Flowsheet 160
   
Figure 14-3. Schematic of the Heap Leaching Process at Nueva Victoria 164
   
Figure 14-4. Schematic of the Iodine Recovery Process at Nueva Victoria 166
   
Figure 14-5. General Arrangement Drawing. Iodide-Iodine Plants of Nueva Victoria 168
   
Figure 14-6. Process Diagram of Iris Plant 169
   
Figure 14-7. General Arrangement of Sur Viejo Evaporation Ponds 172
   
Figure 14-8. General Arrangement of TEA Evaporation Ponds 173
   
Figure 14-9. Projected Water and Reagent Consumption at Nueva Victoria with Implementation of the TEA Extension 178
   
Figure 15-1. General Location of Nueva Victoria 190
   
Figure 15-2. Location of Nueva Victoria Production Area 191
   
Figure 15-3. Nueva Victoria Plant Process Diagram 192
   
Figure 15-4. Nueva Victoria Site Resource Diagram 192
   
Figure 15-5. Nueva Victoria Site Layout 195
   
Figure 15-6. General View of The Evaporation Ponds at the Sur Viejo Industrial Area 199
   
Figure 15-7. General View of Solar Evaporation Ponds in Sur Viejo 200
   
Figure 15-8. General View of The Iris Iodine Plant Area 201
   
Figure 16-1. Iodine and Derivates, Production Evolution 1996-2021 209
   
Figure 16-2. Evolution of the production of nitrates in Chile, 1996-2021 214
   
Figure 17-1. Location of Wells with Granted Water Rights 227
   
Figure 17-2. Hydrogeologic Map of the Area of Background Collection 228
   
Figure 17-3. Sectors of the Area of Influence 231
   
Figure 17-4. Guarantee Chart Update of the Nueva Victoria Mine Closure Plan (in process)
   
Figure 19-1. Sensitivity Analysis 260
   
Figure 20-1. Nueva Victoria Adjacent Properties. 262

 

SQM TRS Nueva Victoria 

 

 

 

1Executive Summary

 

Property Summary and Ownership

 

The Nueva Victoria Property, situated 145 km southeast of the city of Iquique, covers an area of 70,587 hectares (ha) of low topographic relief terrain. The property boundary includes several nitrate and iodine deposits of economic value including Hermosa Oeste, Tente en el Aire, Pampa Hermosa, Pampa Engañadora, etc. The Nueva Victoria Property also has substantial potential for metallic mineralization, notably copper and gold, which could in the future sustain exploitation by SQM or generate royalties. Several properties adjacent to the Nueva Victoria Project host mineral deposits with geological characteristics like those at Nueva Victoria, including mining lots held by ACF Minera S.A., owned by the Urticoechea family.

 

Geology and Mineralization

 

Nueva Victoria is a nitrate-iodine deposit located in the Intermediate Basin (Central Depression) of northern Chile, limited to the west by the Coastal Range (representing the Jurassic magmatic arc) and to the east by the Precordillera (associated with the Cenozoic magmatic activity which gave rise to the large Cu-Au deposits of northern Chile), generating a natural barrier for their deposition and concentration.

 

The regional geology in which the Nueva Victoria deposits are immersed corresponds to Paleogene clastic sedimentary rocks, over a volcanic basement, associated with lavas of intermediate composition (mainly andesites - tuffs) representing Jurassic volcanism, overlying a series of intrusive belonging to the Cretaceous, which mostly outcrops outside the property area.

 

The mineralization at Nueva Victoria is mantiform, with a wide areal distribution, forming deposits several kilometers in extension. The mineralization thicknesses are variable, with mantles of approximately 1.0 to 6.0 meters (m).

 

Because of geological activity over time (volcanism, weathering, faulting) the deposits can be found as continuous mantles, thin salt crusts and superficial caliche and “Stacked" caliche.

 

The mineralogical association identified corresponds mainly to soluble sulfates of Na - K, less soluble sulfates of Ca, Chlorides, Nitrates, and Iodates.

 

Within the mineral species of interest, for Nitrates; Nitratine Potassium Nitrate; Hectorfloresite; Lautarite, Bruggenite as Iodates.

 

In 2022, there was a detailed exploration program of 5,250 ha in the Franja Oeste, TEA Sur; TEA Central, Oeste y Hermosa Oeste. Currently, drilling totals 96,532 reverse circulation (RC) drill holes (390,802 meter). All the drill holes were vertical. Drilling is carried out with wide grid in the first reconnaissance stage (1,000 x 1,000 m; 800 x 800 m; 400 x 400 m); to later reduce this spacing to define the resources in their different categories.

 

SQM TRS Nueva Victoria Pag. 1

 

 

 

Mineral Resource Statement

 

This sub-section contains forward-looking information related to Mineral Resource estimates for the Nueva Victoria Project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecast or projections in the forward-looking information include any significant differences form one or more of the material factors or assumptions that were set forth in this sub-section including geological a grade interpretation a controls and assumptions a forecast associated with establishing the prospects for economic extraction.

 

All available samples were used without compositing and no capping, or other outlier restriction, to develop a geological model in support of estimating Mineral Resources. Hard contacts were used between different geological units. Sectors with a drill hole grid of 50 x 50 m and up to 100T ~ 100 x 50 m were estimated in a three-dimensional block model using the Ordinary Kriging (KO) interpolation method in one pass. Additionally, variograms were constructed and used to support the search for ellipsoid anisotropy and linear trends observed in the data. Iodine and nitrate grade interpolation was performed using the same variogram model calculated for Iodine. In the case of sectors with drill holes grids greater than 100T m and up to 200 x 200 m were estimated in a three-dimensional block model using the Inverse Distance Weighted (IDW) interpolation method. For areas with drill holes grids from 200 x 200 m up to 400 x 400 m were estimated in two dimensional using the Polygon Method.

 

Mineral Resources were classified using the drill hole grid. Zones with grid of 50 x 50 m up to 100T ~ 100 x 50 m were classified as Measured. For Indicated Mineral Resources, the zone should have a 100 x100 m and 200 x 200 m drill hole grid. To define inferred Resources a 400 x 400 m drill hole grid was used.

 

The Mineral Resource Estimate, exclusive of Mineral Reserves, is reported in Table 1-1. Note that based on the application of modifying factors and that because the caliche deposits are at the surface, all Measured an Indicated Mineral Resources with environment permits has been converted into Mineral Reserves, as result, only Inferred Mineral Resources are reported in this Technical Report Summary (TRS). As the mineral resources estimation process is reviewed and improved each year, mineral resources could change in terms of geometry, tonnage, or grades.

 

Table 1-1. In-Situ Mineral Resource Estimate, Exclusive of Mineral Reserves, effective December 31, 2022.

 

Inferred Resource
Nueva Victoria Tonnage (Mt) Nitrate (%) Iodine (ppm)
Cocar 5.1 8.3 221
Los Angeles 9.3 9.0 331
Hermosa Oeste 15.5 4.7 387
TEA Oeste 1.2 4.0 397
Total 31.1 6.5 343

 

SQM TRS Nueva Victoria Pag. 2

 

 

 

(a)Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the Mineral Resource will be converted into Mineral Reserves upon the application of modifying factors.

 

(b)Mineral Resources are reported as in-situ and exclusive of Mineral Reserves, where the estimated Mineral Reserve without processing losses during the reported Long Term was subtracted from the Mineral Resource inclusive of Mineral Reserves. All Measured an indicated Resources with environment permits has been converted into Mineral Reserves; as a result, only inferred Mineral Resources are reported in this TRS.

 

(c)Comparisons of values may not add due to rounding of numbers and the differences caused by use of averaging methods.

 

(d)The units “Mt”, “ppm” and “%” refer to million tons, parts per million, and weight percent respectively.

 

(e)The Mineral Resource estimate considers a nitrate cut-off grade of 3.0 %, based on accumulated cut-off grades and operational average grades, as well as caliche thickness ≥ 2.0 m and overburden thickness ≤ 1.0 m. The nitrate cut-off grade considers the cost and medium-and long-term price forecast of generating iodine as discussed in Section 11, 16 and 19 of this TRS.

 

(f)As the mineral resources estimation process is reviewed and improved each year, mineral resources could change in terms of geometry, tonnage or grades.

 

Density was assigned to all materials with a default value of 2.1 (t/m3), this value comes from several analysis made by SQM in Nueva Victoria and other operations.

 

Resource Estimate considers a cut-off grade of Nitrate of 3.0%, this value considers the corresponding operational, financial and planned investment costs, depreciation, profit margin, and taxes. The iodine price used was to determine reasonable prospects for economic extraction is 40,000 USD/ton the same as that used to estimate Mineral Reserves.

 

Marta Aguilera is the QP responsible for the Mineral Resources. The QP is not aware of any environmental, permitting, legal, title, taxation, socioeconomic, marketing, political or other relevant factors that could materially affect the Mineral Resource Estimate that are not discussed in this Technical Report.

 

Mineral Reserve Statement

 

This sub-section contains forward-looking information related to Mineral Reserve estimates for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecast or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that were set forth in this sub-section including Mineral Resource model tons and grade, modifying factors including mining and recovery factors, production rate and schedule, mining equipment productivity, commodity market and prices and projected operating and capital costs.

 

The Measure Mineral Resources defined by drill hole grid 50 x 50 m and up to 100T; and evaluated using 3D blocks and Ordinary Kriging are considered as high level of geological confidence are qualified as Proven Mineral Reserves with unit conversion coefficient in tonnage and Iodine and Nitrates grades. (See Table 12.2)

 

SQM TRS Nueva Victoria Pag. 3

 

 

 

The Indicate Mineral Resources defined by drill holes grids greater than 100T up to 200 x 200 m; and evaluated using 3D blocks model and Inverse Distance Weighted (IDW) interpolation method is considered as medium level of geological confidence are qualified as Probable Mineral Reserves. Conversion factors used are less than one for iodine (0.90) and nitrate (0.85) grades.

 

Mineral Reserves are based on a nitrate cut-off grade of 3.0 %, Iodine price of 40.0 USD/kg; for finished fertilizer products sold at Coya Sur price of 820 USD/ton; and based on economic viability as demonstrated in an after-tax discounted cashflow (see Section 19). All Mineral Reserves are defined in sectors with environmental permits (RCA)

 

Based on these criteria, Proven Reserves Mineral at Nueva Victoria are estimated in to 219.5 million tons (Mt) with an estimated average nitrate grade of 5.9% and 441 ppm iodine.

 

Probable Mineral Reserves at the Nueva Victoria site are 553.0 Mt with and estimated average nitrate grade of 5.1% and 415 ppm iodine.

 

Mineral Reserves are stated as in-situ ore.

 

Table 1-2. Mineral Reserve at the Nueva Victoria Mine (Effective 31 December 2022)

 

  Proven Reserves Probable Reserves Total Reserves
Tonnage (Mt) 219.5 553 772.5
Iodine Grade (ppm) 441 415 422
Nitrate Grade (%) 5.9 5.1 5.3
Iodine (kt) 96.8 229.5 326.3
Nitrate (kt) 12,951 28,203 41,154

 

Notes:

 

(a)Mineral Reserves area based on Measured and Indicate Mineral Resources at an operating cutoff of 3.0 % nitrate. Operating constraints of caliche thickness ≥ 2.0 m; overburden thickness ≤ 1.0 m and waste / caliche ratio ≤ 0.5 are applied.

 

(b)Proven Minerals Reserves are based on Measured Mineral Resources at the criteria described in (a) above.

 

(c)Probable Mineral Reserves are based on Indicated Mineral Resources at the criteria described in (a) above with a grade call factor of 0.85 for Nitrate and 0.9 for Iodine confirmed by the calculation of the uncertainty of the estimated model by IDW.

 

(d)Mineral Reserves are stated as in-situ ore (caliche) as the point of reference.

 

(e)The units “Mt”, “kt”; “ppm” and “%” refer to million tons, kilotons; parts per million, and weight percent respectively.

 

(f)Mineral Reserves are based on an Iodine price of 40.0 USD/kg and a finished fertilizer product sold at Coya Sur of 820 USD/ton. Miner is also based on economic viability as demonstrated in an after-tax discounted cashflow (see Section 19).

 

(g)Marta Aguilera is the QP responsible for the Mineral Resources.

 

(h)The QP is not aware of any environmental, permitting, legal, title, taxation, socioeconomic, marketing, political or other relevant factors that could materially affect the Mineral Reserve estimate.

 

(i)Comparison of values may not total due to rounding of numbers and the differences caused by use of averaging methods.

 

SQM TRS Nueva Victoria Pag. 4

 

 

 

Mine Design and Scheduling

 

At Nueva Victoria the total amount of Caliche extraction reached in 2022 was 44.3 million tons (Mt). Caliche production for the Long Term (LP) form 2023 through 2040 ranges between 44 Mt per year to 40 Mt per year for a total ore production of 773 Mt with an average iodine grade of 422 ppm and a nitrate grade of 5.3%. The mining procedure at Nueva Victoria involves the following processes:

 

Removal of surface layer and overload (between 0.50 m to 1.0 m thick).

 

Caliche extraction, up to a maximum depth of 6 m, through explosives (drill & blast) or surface miner (continuous miner MC).

 

Caliche loading, using front-end loaders and/or shovels.

 

Transport of the mineral to heap leach, using mining trucks (rigid hopper) of high tonnage (100 to 150 tons).

 

Construction of heap leach to accumulate a total of 1 Mt, with heights of 7 to 15 m and a crown area of 65,000 square meters (m²).

 

The physical stability analysis performed by SQM indicates that these heaps are stable for long-term stable, and no slope modification is required for closure.

 

Continuous irrigation of heap leach is conducted to complete the leach cycle. The cycle of each heap lasts approximately 300 to 500 days and during this time, heap height decreases by 15% to 20%.

 

The criteria set by SQM to establish the mining plan correspond to the following:

 

Caliche thickness ≥ 2.0 m

 

Overburden thickness ≤ 1.0 m

 

Barren / Mineral Ratio < 0.5

 

Nitrate cut-off grades of 3.0 %.

 

Unit sales Price for prilled Iodine 40,000 USD/ton and a unit total cost of 19.5 USD/kg (mining, leaching, seawater pipeline and plant processing).

 

Approximately 71% of the caliche will be extracted using the traditional methods of drill & blast while the remaining 29% will we extracted using CM (continuous miner).

 

In the mining processes, SQM considers an efficiency between 80% an 90% (losses of mineral and grades dilution in the integral process of mineral extraction, load, and transport; and heap leach construction).

 

Given the production factors set in mining and leaching processes (56.6 % for Iodine and 58.7 % for Nitrates production for leaching that are average values), a total production of 184.6 kt of Iodine and 15,256 kt of nitrate salts is expected for this period (2023- 2040) from lixiviation process to treatment plants.

 

SQM TRS Nueva Victoria Pag. 5

 

 

 

Metallurgy and Mineral Processing

 

1.1.1Metallurgical Testing Summary

 

The test work developed is aimed at determining the susceptibility of raw materials to production by means of separation and recovery methods established in the plant, evaluating deleterious elements, to establish mechanisms in the operations and optimize the process to guarantee a recovery that will be intrinsically linked to the mineralogical and chemical characterization, as well as physical and granulometric of the mineral to be treated.

 

Historically, SQM Nitrates, through its Research and Development area, has conducted tests at plant and/or pilot scale that have allowed improving the knowledge about the recovery process and product quality through chemical oxidation tests, solution cleaning and recently, optimization tests of leaching heap operations, through the prior categorization of the ore to be leached.

 

SQM's analysis laboratories located in the city of Antofagasta and the Iris Pilot Plant Laboratory (Nueva Victoria) perform physicochemical, mineralogical, and metallurgical tests. The latter allow to know the behavior of the caliche bed against water leaching and thus support future performance. In addition, the knowledge generated contributes to the selection of the best irrigation strategy to maximize profit and a and the estimation of recovery at industrial scale by means of empirical correlations between the soluble content of caliches and the metallurgical yields of the processes.

 

1.1.2Mining and Mineral Processing Summary

 

The Nueva Victoria Operation comprises the sectors of Nueva Victoria belonging to Nueva Victoria, Sur Viejo and Iris. The production process begins with mining of “Caliche “ore. The ore is heap-leached to generated iodate & nitrate rich leaching solutions referred to by SQM as “Brines”. The brines are piped to processing plants where the iodate is converted to iodide, which is them processed to obtain pelleted (“Prilled”) iodine. The iodine-depleted brine which exits the iodide plant is referred to as brine Feble (“BF”) by SQM, literally feble brine in the sense of depleted, weakened. A proportion of the of the BF is recirculated to the heap-leaching stage of the process; the remaining BF is routed to the evaporation ponds at Sur Viejo. The solar evaporation ponds produce salts rich in sodium nitrate and potassium nitrate. These nitrate-rich salts are sent to the SQM Coya Sur Plants (locate 160 Km to the south of Nueva Victoria, and 7 Km southeast of the town of Maria Elena in the Antofagasta Region of northern Chile) where they are refined to produce commercial sodium nitrate a potassium nitrate.

 

The surface area authorized for mining at Nueva Victoria is 1,299 square kilometers (km2). The surface area authorized for mining at Iris is 45.5 km2. No expansion is planned at Iris.

 

Caliche extraction at Nueva Victoria is 37 million tons per year (Mtpy), with an additional 6.48 Mtpy at Iris. The overall mining rate at Nueva Victoria and Iris will be increased to a total of 71.48 Mtpy with the incorporation of the TEA expansion.

 

SQM TRS Nueva Victoria Pag. 6

 

 

 

Capital and Operating Costs

 

This section contains forward-looking information related to capital and operating cost estimates for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecast or projection in the forward-looking information include any significant differences from one or more of the materials factors or assumptions that were set forth in this section including prevailing economic conditions continue such that projected capital costs, labor and equipment productivity levels and that contingency is sufficient to account for changes in material factors or assumptions.

 

The annual production estimates were used to determine annual estimates of capital and operating costs. All cost estimates were in 2022 USD. Total capital costs are estimated to be about USD 873 million for seawater pipelines, new facilities for the TEA expansion project, as well as sustaining and expansion capital for current operations. Annual operating costs were based on historical operating costs, material movements and estimated unit costs provided for SQM. These including mining, leaching, iodine and nitrate production. Ore capital costs included working capital and closure costs. Annual total operating cost of 6.3 USD/ton caliche to 7.7 USD/ton of caliche, with an average total operating cost of 7.1 USD/ton of caliche over the Long Term. (Table 19.3)

 

Economic Analysis

 

This section contains forward-looking information related to economic analysis for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecast or projection in the forward-looking information include any significant differences from one or more of the materials factors or assumptions that were set forth in this sub section including estimated capital and operating costs, project schedule and approvals timing, availability of funding, projected commodities markets and prices.

 

All costs were assumed in 2022 USD.

 

For the economic analysis a Discounted Cashflow (DCF) model was development.

 

An iodine sales price of 40,000 USD/ton and a nitrate salt for fertilizer price of 333 USD/ton was used in the discounted cashflow. The imputed nitrate salts for fertilizer price of 333 USD/ton were estimated based on average price for finished fertilizer products sold at Coya Sur of 820 USD/ton, less 487 USD/ton for production cost at Coya Sur.

 

QP believes these prices reasonably reflect current market prices and are reasonable to use as sales prices for the economic analysis for this Study.

 

The discounted cashflow establishes that the Mineral Reserves estimate provided in this report are economically viable. The base case NPV10 is estimated to be USD 1.85 billion. The Net Present Value for this study is most sensitive to operating cost and sales prices of both iodine and nitrates. (Table 19.4) QP considers the accuracy and contingency of cost estimates to be well within a Prefeasibility Study (PFS) standard and enough for the economic analysis supporting the Mineral Reserve estimated for SQM.

 

SQM TRS Nueva Victoria Pag. 7

 

 

 

Conclusions and Recommendations

 

Miss. Marta Aguilera QP of Mineral Resources and Mineral Reserves concludes that the work done in the review of this TRS includes adequate details and information to declare the Mineral Reserves. In relation to the resource treatment processes, the conclusion of the responsible QP, Gino Slanzi, is that appropriate work practices and equipment, design methods and processing equipment selection criteria have been used. In addition, the company has developed new processes that have continuously and systematically optimized its operations.

 

Some recommendations are given in the following areas:

 

Continue with the improvements implemented during the year 2022 for the Qa-Qc program to integrate it to Acquire System manages to align with the best practices of the industry, facilitating with this a more robust quality control.

 

With the migration of geological database to Acquire platform, traceability of drilling, geology, geochemical data is achieved in a secure base.

 

It is considered important to evaluate the leachable material through heap leaching simulation, which allows the construction of a conceptual model of caliche leaching with a view to secondary processing of the riprap to increase the overall recovery . It is recommended to continue with the research work of the geometallurgical model to determine the real recovery to the increase of water.

 

Environmental issues include leachate or acid water management, air emissions management, tailings dump management, and leachate riprap.

 

All the above recommendations are considered within the declared CAPEX/OPEX and do not imply additional costs for their execution.

 

SQM TRS Nueva Victoria Pag. 8

 

 

 

2Introduction

 

This Technical Summary Report (TRS) was prepared by SQM's team of professionals and external advisors for Sociedad Química y Minera de Chile (SQM), in accordance with the requirements of Regulation SK, Subpart 1300 of the United States Securities Exchange Commission (SEC), hereinafter referred to as SK 1300.

 

Terms of Reference and Purpose of the Report

 

At Nueva Victoria SQM produces nitrate salts (sodium nitrate and potassium nitrate) and iodine, by heap leaching and evaporation.

 

The effective date of this TRS report is December 31, 2022.

 

This TRS uses English spelling and Metric units of measure. Grades are presented in weight percent (wt.%). Costs are presented in constant US Dollars as of December 31, 2022.

 

Except where noted, coordinates in this TRS are presented in metric units using the World Geodesic Reference System (PSAD) 1956 Universal Transverse Mercator (UTM) ZONE 19 South (19S).

 

The purpose of this TRS is to report Mineral Resources and Mineral Reserves for SQM’s Nueva Victoria operation.

 

Source of Data and Information

 

This TRS is based on information from SQM and public domain data. All information is cited throughout this document and is listed in the final "References" section at the end of this report. Table 2-1 provides the abbreviations (abbv.) and acronyms used in this TRS.

 

Table 2-1. Abbreviations and Acronyms

 

Acronym/Abbv. Definition
' minute
'' second
% percent
° degrees
°C degrees Celsius
100T 100 truncated grid
AA Atomic absorption
AAA Andes Analytical Assay
AFA weakly acidic water
AFN Feble Neutral Water
Ajay Ajay Chemicals Inc.
AS Auxiliary Station
ASG Ajay-SQM Group
BF Brine Feble
BFN Neutral Brine Feble
BWn abundant cloudiness
CIM Centro de Investigación Minera y Metalúrgica

 

SQM TRS Nueva Victoria Pag. 9

 

 

 

Acronym/Abbv. Definition
cm centimeter
CM continuous miner
CU Water consumption
COM Mining Operations Center
CSP Concentrated solar power
CONAF National Forestry Development Corporation
DDH diamond drill hole
DGA General Directorate of Water
DTH down-the-hole
EB 1 Pumping Station No. 1
EB2 Pumping Station No. 2
EIA environmental impact statement
EW east-west
FC financial cost
FNW feble neutral water
g gram
G gravity
GU geological unit
g/cc grams per centimeter
g/mL grams per milliliter
g/ton grams per ton
g/L grams per liter
GPS global positioning system
h hour
ha hectare
ha/y hectares per year
HDPE High-density Polyethylene
ICH industrial chemicals
ICP inductively coupled plasma
ISO International Organization for Standardization
kg kilogram
kh horizontal seismic coefficient
kg/m3 kilogram per cubic meter
km kilometer
kv vertical seismic coefficient
kN/m3 kilonewton per cubic meter
km2 square kilometer
kPa Kilopascal
kt kilotonne
ktpd thousand tons per day
ktpy kilotonne per year

 

SQM TRS Nueva Victoria Pag. 10

 

 

 

Acronym/Abbv. Definition
kUSD thousand USD
kV kilovolt
kVa kilovolt-amperes
L/h-m2 liters per hour square meter
L/m2 /d liters per square meter per day
L/s liters per second
LR Leaching rate
LCD/LED liquid crystal displays/light-emitting diode
LCY Caliche and Iodine Laboratories
LdTE medium voltage electrical transmission line
LIMS Laboratory Information Management System
LOM life-of-mine
m meter
M&A mergers and acquisitions
m/km2 meters per square kilometer
m/s meters per second
m2 square meter
m3 cubic meter
m3 /d cubic meter per day
m3 /h cubic meter per hour
m3 /ton cubic meter per ton
masl meters above sea level
mbgl meter below ground level
mbsl meters below sea level
mm millimeter
mm/y millimeters per year
Mpa megapascal
Mt million ton
Mtpy million tons per year
MW megawatt
MWh/y Megawatt hour per year
NNE north-northeast
NNW north-northwest
NPV net present value
NS north south
O3 ozone
ORP oxidation reduction potential
PLS pregnant leach solution
PMA particle mineral analysis
ppbv parts per billion volume
ppm parts per million

 

SQM TRS Nueva Victoria Pag. 11

 

 

 

Acronym/Abbv. Definition
PVC Polyvinyl chloride
QA Quality assurance
QA/QC Quality Assurance/Quality Control
QC Quality control
QP Qualified Person
RC reverse circulation
RCA environmental qualification resolution
RMR Rock Mass Rating
ROM run-of-mine
RPM revolutions per minute
RQD rock quality index
SG Specific gravity
SEC Securities Exchange Commission of the United States
SSE South-southeast
SEIA Environmental Impact Assessment System
MMA Ministry of Environment
SMA Environmental Superintendency
SNIFA National Environmental Qualification Information System (SMA online System)
PSA Environmental Following Plan (Plan de Seguimiento Ambiental)
SEM Terrain Leveler Surface Excavation Machine
SFF specialty field fertilizer
SI intermediate solution
SING Norte Grande Interconnected System
S-K 1300 Subpart 1300 of the Securities Exchange Commission of the United States
SM salt matrix
SPM sedimentable particulate matter
Sr relief value, or maximum elevation difference in an area of 1 km²
SS soluble salt
SX solvent extraction
t ton
TR Irrigation rate
TAS sewage treatment plant
TEA project Tente en el Aire Project
tpy tons per year
t/m3 tons per cubic meter
tpd tons per day
TRS Technical Report Summary
ug/m3 microgram per cubic meter
USD United States Dollars
USD/kg United States Dollars per kilogram
USD/ton United States Dollars per ton

 

SQM TRS Nueva Victoria Pag. 12

 

 

 

Acronym/Abbv. Definition
UTM Universal Transverse Mercator
UV ultraviolet
VEC Voluntary Environmental Commitments
WGS World Geodetic System
WSF Water soluble fertilizer
wt.% weight percent
XRD X-Ray diffraction
XRF X-ray fluorescence

 

Details of Inspection

 

The most recent site visit dates for each Qualified Person (QP) are listed in Table 2-2:

 

Table 2-2. Summary of site visits made by QPs to Nueva Victoria in support of TRS Review

 

Qualified Person (QP) Expertis Date of Visit Details of Visit
Marta Aguilera Geology nov-22 Nueva Victoria Mine and Facilities
Gino Slanzi Metallurgy and Mineral Processing dic-22 Inspection of Iodine Plants, Mine and Leaching Piles
Marco Lema Mining dic-22 Nueva Victoria Mine and Facilities

 

During the site visits to the Nueva Victoria Property, the QPs, accompanied by SQM technical staffs:

 

Visited the mineral deposit (caliche) areas.

 

Inspected drilling operations and reviewed sampling protocols.

 

Reviewed core samples and drill holes logs.

 

Assessed access to future drilling locations.

 

Viewed the process though mining, heap leaching to the finished prilled iodine product.

 

Reviewed and collated data and information with SQM personnel for inclusion in the TRS.

 

Previous Reports on Project

 

Technical Report Summary prepared by WSP Consulting Chile (WSP), March 2022.

 

SQM TRS Nueva Victoria Pag. 13

 

 

 

3Description and Location

 

Location

 

The Nueva Victoria Property is in the Commune of Pozo Almonte, in the Province of Tamarugal, within the Region of Tarapacá of northern Chile. The center of the property is situated 80 km south-southeast (SSE) of the City of Iquique and 70 km south of the City of Pozo Almonte.

 

The access control checkpoint to the Property is located on the eastern side of the Ruta 5 South trunk road (the Panamericana Highway), 83 km south of the City of Pozo Almonte. The Nueva Victoria Property is approximately 55 km north-south by 40 km east-west.

 

Figure 3-1. General Location Map

 

 

SQM TRS Nueva Victoria Pag. 14

 

 

 

Mineral Titles, Claims, Rights, Leases and Options

 

SQM currently has 5 mineral properties located in the north of Chile, in the First Region of Tarapacá (I) and Second Region of Antofagasta (II). These are the Nueva Victoria, Pampa Orcoma; María Elena, Pedro de Valdivia and Pampa Blanca properties. All properties cover a combined area of approximately 291,080 ha and has been make prospecting grid resolution of 400 x 400 m or finer.

 

The Nueva Victoria Property covers an area of approximately 77,115 ha.

 

Mineral Rights

 

SQM owns mineral exploration rights over 1,539,177 ha of land in the I and II Regions of northern Chile and is currently exploiting the mineral resources over less of 1% of this area (as of Dec 2022).

 

.

 

Figure 3-2. Location of Nueva Victoria Project

 

 

SQM TRS Nueva Victoria Pag. 15

 

 

 

Environmental Impacts and Permitting

 

Since 1997, SQM has completed numerous Environmental Impact Assessments (EIA) (Estudio de Impacto Ambiental) and Environmental Impact Statements (EIS) (Declaración de Impacto Ambiental, DIA) in support of the development and ongoing expansion of the Nueva Victoria Property (including the “Pampa Hermosa” and “TEA” Projects). These environmental assessments are completed within the Chilean regulatory platform Sistema de Evaluación de Impacto Ambiental (SEIA), which is managed by the Chilean Regulatory Authority, the Servicio de Evaluación Ambiental (SEA, https://www.sea.gob.cl/).

 

Section 17.1 of this TRS details these environmental studies and the environmental approvals (permits), termed Resoluciones de Calificación Ambiental (RCA), issued by SEA.

 

Other Significant Factors and Risks

 

SQM’s operations are subject to certain risk factors that may affect the business, financial conditions, cash flow, or SQM’s operational results. The list of potential risk factors is summarized below:

 

Risks related to be a company based in Chile; potential political risks as well as changes to the Chilean Constitution and legislation that could conceivably affect development plans, production levels, royalties and other costs.

 

Risks related to financial markets.

 

Royalties and Agreements

 

Apart from paying standard mineral royalties to the Government of Chile, in compliance with the Chilean Royalty Law, SQM has no obligations to any third party in respect of payments related to licenses, franchises or royalties for its Nueva Victoria Property.

 

SQM TRS Nueva Victoria Pag. 16

 

 

 

4Accessibility, Climate, Local Resources, Infrastructure and Physiography

 

This section of the TRS provides a summary of the physical setting of the Nueva Victoria Property, access to the property and relevant civil infrastructure.

 

Topography

 

The Nueva Victoria Property is located in the Intermediate Basin (Central Depression) of the Atacama Desert. The property constitutes an area of gentle topographic relief with an average elevation of 1.500 masl.

 

Figure 4-1 presents a topographic map developed from a digital elevation model (DEM) corresponding to a 30 m resolution ASTER satellite image. The lower part of the figure presents a topographic cross section through the DEM. The figure categorizes the topographic slope into the six categories summarized in Table 4-1.

 

Table 4-1. Slope Categories applied in the analysis of the ASTER DEM

 

Slope Category From To
Very Low 4.3°
Low 4.3° 9.94°
Moderate 9.94° 16.71°
Medium 16.71° 26.58°
High 26.58°
Very High Slopes > 38.66°

 

From inspection of Figure 4-1, it can be appreciated that the Nueva Victoria Property presents slopes that vary from very low (near flat) to moderate or medium. The steepest slopes are observed in the western sector, close to the coast, due to the coastal scarp.

 

SQM TRS Nueva Victoria Pag. 17

 

 

 

Figure 4-1. Slope parameter map Sr and elevation profile trace AA"

 

 

SQM TRS Nueva Victoria Pag. 18

 

 

 

Vegetation

 

The Nueva Victoria Property is a desert landscape devoid of vegetation cover (EIA, 2007).

 

Access to the Property

 

As detailed in Section 1 of this TRS, the Nueva Victoria Property is situated 80 km SSE the City of Iquique and 70 km south of the City of Pozo Almonte. The principal route to the property from Diego Aracena International Airport is as follows:

 

1.Drive 28 km north on Ruta 1 to the City of Iquique.

 

2.Travel northeast through the City of Iquique on primary roads to take Ruta 16 (motorway) to reach the settlement of Alto Hospicio at 44 km total distance driven.

 

3.Continue East on Ruta 16 (motorway) for 83 km to reach the deserted mining town of Humberstone. Humberstone is a Chilean National Monument and part of a UNESCO World Heritage Site where saltpeter (KNO3) was formerly mined.

 

4.At Humberstone, turn south on the trunk road of Ruta 5, reaching the City of Pozo Almonte at 87 km from Humberstone.

 

5.Continue south on the trunk road of Ruta 5, reaching the SQM access control checkpoint (garita) of the Nueva Victoria property at 171 km.

 

Climate and Length of Operating Season

 

Nueva Victoria is in the Intermediate Basin (Central Depression) of the hyper arid Atacama Desert at a latitude of approximately 21°S. The topographic relief at the property is gentle and much of the area is essentially flat with an average elevation of 1,500 masl. Long-term annual rainfall is close to 0 mm, and the annual average temperature is 18° C. Relative humidity of the air is low. On very rare occasions, the convective summer rains which occur from November to February over land above 4,000 masl on the Altiplano of the Andes may extend west to bring very infrequent rain to the Intermediate Basin and Nueva Victoria.

 

The climate of the study area is classed as a low marginal desert climate within the Köppen climate classification (EIA, 2007).

 

Nueva Victoria operates all year, there are no climate constraints which would force the operations to shut down during any part of the year. However, in the event of a very rare thunderstorm, precautions must be taken to eliminate the risk to life that that lightning strikes could present.

 

SQM TRS Nueva Victoria Pag. 19

 

 

 

Infrastructure

 

In the Nueva Victoria mining area and, the following facilities and infrastructures can be found.

 

The main facilities at Nueva Victoria are follows:

 

Caliche mining areas.

 

Industrial water supply.

 

Heap leaching operation.

 

Iodine plants (Nueva Victoria and Iris properties).

 

Evaporation ponds (Sur Viejo).

 

Iodine production & prilling Plant NV (Nueva Victoria).

 

Administrative and technical offices and training rooms.

 

Medical facilities.

 

Camp and associated facilities (gym, restaurant, etc.).

 

Domestic waste disposal site.

 

Hazardous waste yard.

 

Non-hazardous industrial waste yard.

 

SQM TRS Nueva Victoria Pag. 20

 

 

 

5History

 

Commercial exploitation of caliche mineral deposits in northern Chile began in 1830s when sodium nitrate was extracted from the mineral for use in explosives and fertilizers production. By the end nineteenth century, nitrate production had become Chile's leading industry, and, with it, Chile became a world leader in nitrates production and supply. This boom brought a surge of direct foreign investment and the development of the Nitrate “Offices” or “Oficinas Salitreras” as they were called.

 

Synthetic nitrates' commercial development in 1920s and global economic depression in l930s caused a serious contraction of the Chilean nitrate business, which did not recover in any significant way until shortly after World War II. Post-war, widely expanded commercial production of synthetic nitrates resulted in a further contraction in Chile's natural nitrate industry, which continued to operate at depressed levels into their 1960s.

 

The Victoria “Office” was first established between 1941 and 1944 by the “Compañía Salitrera de Tarapacá”. At its peak, Victoria produced 150,000 metric tons of nitrates with over 2,000 employees. In 1960, CORFO, Chile´s Production Development corporation. Formed the roots of SQM. In 1971, Anglo Lautaro sold all its shares to CORFO and SQM became wholly owned by the Chilean government since SQM´s inception, nitrates and iodine have been produced from caliche deposits in northern Chile.

 

In late 2002, Nueva Victoria East was re-established as a mining operation. Nueva Victoria mineral is transported by trucks to heap leach facilities where iodine is produced. This site is made up of facilities located in three sectors corresponding to Nueva Victoria, Sur Viejo and Iris.

 

The overall site layout is shown in Figure 6-4.

 

In 2014, there was investment into developing new mining sectors and increased production of both nitrates and iodine at Nueva Victoria, achieving a production capacity (including Iris facility) of approximately 8,500 metric tons per year of iodine at the site.

 

In 2015, SQM company focused on increasing the efficiency of its operations. This included a plan to restructure our iodine and nitrates operations. To take advantage of highly efficient production facilities at Nueva Victoria, it was decided to suspend mining and nitrates operations and reduce iodine production at Pedro de Valdivia site. During 2017, production capacity for iodine was increased at Nueva Victoria, with current effective iodine capacity at approximately 14,000 metric tons per year.

 

SQM TRS Nueva Victoria Pag. 21

 

 

 

6Geological Setting, Mineralization and Deposit

 

Regional Geological Setting

 

In Chile, the nitrate-iodine deposits are in the intermediate basin, limited to the east by the Coastal Range (representing the Jurassic magmatic arc) and the Precordillera (associated to the magmatic activity originating from the mega Cu-Au deposits in northern Chile), generating a natural barrier for their deposition and concentration. (Figure 6-1)

 

The salt and nitrate deposits of northern Chile occur in all topographic positions from hilltops and ridges to the centers of broad valleys (Ericksen, 1981). They are hosted in rocks of different ages and present very varied lithologies; however, a distinctive feature is that they are always related in some way to a key unit known as the Saline Clastic Series (CSS à Late Oligocene to Neogene). The CSS comprises mainly siliciclastic and volcanoclastic sandstones and conglomerates produced by erosion and re-sedimentation of pre-existing rocks of the Late Cretaceous-Eocene volcanic arc. This key stratigraphic unit includes rocks deposited under a range of sedimentary environments including fluvial, eolian, lacustrine, and alluvial, but all were developed primarily under arid conditions. The upper parts of CSS include lacustrine and evaporitic rocks composed mainly of sulfates and chlorides. The outcrop of CSS always lies to the west of the ancient Late Cretaceous-Eocene volcanic arc, covering the present-day topography (Chong et al., 2007).

 

Figure 6-1. Geomorphological scheme of saline deposits in northern Chile.

 

 

Note: Nitrate deposits are restricted to the eastern edge of the Coastal Range and in the Central Basin (Taken from Gajardo, A & Carrasco, R. (2010). Salares del Norte de Chile: Potential Lithium Source. SERNAGEOMIN, Chile).

 

SQM TRS Nueva Victoria Pag. 22

 

 

 

Most of the nitrate deposits in Chile are found in the provinces of Tarapacá and Antofagasta, with more northerly occurrences in Tarapacá largely restricted to a narrow band along the eastern side of the Coastal Range; while, to the south they extended extensively not only in the Coastal Range, but also in the Central Valley and the Andean Front (Garret, 1983). Extremely rare minerals are present in this type of deposits, among which we find nitrates, nitrate-sulphates, chlorides, perchlorates, iodates, borates, carbonates, and chromates. The mineralization occurs as veins or impregnations filling pores, cavities, desiccation polygons and fractures of unconsolidated sedimentary deposits; or as a massive deposit forming a consolidated to semi-consolidated cement as extensive uniform mantles cementing the regolith, called caliche.

 

The regional geology in which the Nueva Victoria nitrate-iodine deposits are situated corresponds to Paleogene clastic sedimentary rocks, over a volcanic basement, associated with lavas of intermediate composition (mainly andesites - tuffs) representing Jurassic volcanism. The area of influence of the geological component includes the coastal plain, the coastal Farellón, the coastal mountain range and the central Gran pampa. The oldest rocks outcropping in the area correspond to Upper Carboniferous Granitoids. This unit is covered by rocks of the Sierra de Lagunas Strata, which correspond to Upper Triassic-Lower Jurassic volcano-sedimentary products and affected by associated hypabyssal intrusive rocks. The Sierra de Lagunas strata are covered in apparent concordance by rocks of The Oficina Viz Formation, which represent the volcanic products of the Lower and Middle Jurassic magmatic arc.

 

The Cerro Vetarrón Monzonite outcrops in the central sector of the Cordillera de la Costa, it is partly contemporaneous with the Oficina Viz Formation. The Oficina Viz Formation is concordantly covered by marine sedimentary rocks of the Huantajaya Group à the Lígate Cove Formation and the El Godo Formation.

 

Plutonic rocks originated in the arc magmatism during the Upper Jurassic-Lower Cretaceous, represented by the Patache Diorite, the Cerro Carrasco Intrusive Complex, and the Oyarbide Intrusive Complex, as well as by hypabyssal bodies associated with the latter unit. These complexes outcrop in the coastal strip and in the western edge of the Coastal Range.

 

The deformation processes of north-south faults associated with the Atacama Fault System caused structural basins (tensional basins and grabens) where the Cerro Rojo Formation and Punta Barranco Formation were continentally deposited. These Mesozoic units are intruded by Lower Cretaceous subvolcanic intrusive and granitoids of the Montevideo Intrusive Complex. These intrusive bodies outcrop in the easternmost portion of the Cordillera de la Costa and the second unit presents ages that decrease towards the east. On the other hand, in the eastern limit of the Coastal Range, isolated rocks of Upper Cretaceous intrusive outcrop, which represent the magmatism of that period and evidence the migration of the magmatism axis towards the east.

 

The Great Coastal Escarpment generated during the Pleistocene-Holocene by the combined action of eustatic, tectonic and erosive events, limits the western edge of the Coastal Range with the Coastal Strip. Attached to the Great Coastal Escarpment there are large volumes of colluvial deposits, which are also found on a smaller scale along escarpments associated with east-west faults and on the slopes of some mountain fronts. After the generation of the Great Coastal Escarpment, sedimentation of littoral deposits occurs at its foot. Massive landslide deposits caused by various gravitational displacements of material from the western edge of the Coastal Mountain Range.

 

SQM TRS Nueva Victoria Pag. 23

 

 

 

In the Pleistocene-Holocene, the deposition of the Alto Hospicio Gravels and the alluvial deposits occur in the Coastal Range in the Pleistocene-Holocene, which are restricted to the bottoms of the ravines and locally form alluvial fans. These deposits have a considerably smaller extension than the Oligocene-Pliocene deposits, which shows a reduction in the contribution of alluvial clastic material. On the other hand, in the Central Basin there are large extensions of Pleistocene-Holocene alluvial deposits, whose components come from the erosion of rocks from the Precordillera. These alluvial deposits are cut and covered by active alluvial deposits, of lesser extension and made up of clays, silts, and fine sands.

 

Local Geology

 

The geology of the Nueva Victoria Property is presented in Figure 6-2. The geological units are described below.

 

6.1.1Intrusive Igneous Rocks

 

Granites, diorites, quartz monzonites and gabbro of Cretaceous age, intruded as sills and dikes. Denoted as Jg on the geological map.

 

6.1.2Volcanic and Marine Sedimentary Sequences

 

Jurassic age marine sedimentary rocks (sandstones, glauconitic breccias, shales and limestones) with intercalations of continental andesites and andesitic breccias. Denoted as Jm(m) on the geological map.

 

6.1.3Stratified Sedimentary and Volcaniclastic Rocks

 

This category comprises Mesozoic to Cenozoic sedimentary and volcaniclastic units comprising:

 

Continental volcanoclastic rocks of Jurassic age comprising andesites, breccias & andesitic agglomerates with intercalations of continental sediments. Denoted as Jv (i) on the geological map.

 

Continental clastic sedimentary rocks of Triassic age comprising conglomerates, sandstones & quartzites with intercalations of marine sedimentary rocks. Denoted as Tr on the geological map.

 

Poorly to well consolidated sediments of Quaternary age comprising aeolian sediments, colluvial deposits, alluvial fans, terraces, and sedimentary debris flows. Denoted as Qcp on the geological map.

 

Evaporitic salts forming salt pans, salt flats, saline & gypsiferous crusts, associated with modern and former wetlands and brackish or saline lagoons and areas of former or current shallow water tables. Denoted as Qs on the geological map.

 

Recent alluvial sediments, sedimentary debris flows and aeolian deposits. Denoted as Qal on the map.

 

SQM TRS Nueva Victoria Pag. 24

 

 

 

Figure 6-2. Geological map at Nueva Victoria. Internal document-SQM

 

 

SQM TRS Nueva Victoria Pag. 25

 

 

 

 

 

SQM TRS Nueva Victoria Pag. 26

 

 

 

Property Geology

 

Through the collection of geological information by logging of drill holes and surface mapping, five stratified subunits have been identified within the Quaternary Unit (Qcp) (Units A to E). (Figure 6-3). These units correspond to sediments and sedimentary rocks that host the non-metallic or industrial ores of interest, i.e., iodine and nitrate. Each of the units is described below.

 

6.1.4Unit A

 

Forms the upper part of the profile. It corresponds to a sulfated soil or petrogypsic saline detrital horizon of light brown color. It has an average thickness of approximately 0.4 m. It consists mainly of sand and silt-sized grains, and to a lesser extent gravel-sized clast. It presents as a well-cemented horizon at depth, while higher in the profile, within 0.2 m of ground surface, weathering and leaching of the more soluble components have rendered it porous and friable. At ground surface it presents as loose fine sand to silt-sized sediment, referred to locally as "chuca" or "chusca" which is readily transported by the wind or lofted by dust devils. Below the chusca, the competent part of the unit may present subvertical cracks vertical cracks, which may become filled with chusca o aeolian sediments.

 

6.1.5Unit B

 

Underlies Unit A. It corresponds to a light brown detrital sulfate soil characterized by anhydrite nodules in a medium to coarse sand matrix. Its thicknesses may vary laterally. It is typically between 0.5 to 1.0 m but may become laterally impersistent.

 

6.1.6Unit C

 

Underlies Unit B. It comprises fine to medium dark brown sandstones, with intercalations of sedimentary breccias. The thickness of this unit varies between 0.5 to 2.0 m. The sandstones and breccias are well consolidated and cemented by salts comprising sulfates, chlorides & nitrates. The salts occur as envelopes around the sedimentary clasts (sand and gravel grains), fill cavities between the sedimentary clasts and form saline aggregates due to saline efflorescence, (the deposition of salts from the evaporation of water from the capillary fringe of shallow water tables).

 

6.1.7Unit D

 

Underlies Unit C. It comprises dark brown matrix-supported polymictic breccias. The thickness of this units varies between 1 to 5 m. The clasts are angular, tending towards sub rounded with depth. They range from 2 mm (very fine gravel) to 80 mm (small cobble) in diameter. Lithologically, the clasts comprise porphyritic andesites, amygdaloidal andesites, intrusive and highly altered lithics. The matrix of the breccias consists of medium to coarse sand-sized grains. The breccia is well consolidated and cemented by salts. As in the case of Unit C, the salts comprise sulfates, chlorides and nitrates, which occur as envelopes around the clasts, fill cavities and present as saline aggregates resulting from saline efflorescence.

 

SQM TRS Nueva Victoria Pag. 27

 

 

 

 

6.1.8Unit E

 

This unit is like Unit D, except for the sedimentary fabric and structure. It comprises dark brown clast-supported polymictic conglomerates. The clasts are sub rounded, and present a wide range of sizes, with some clasts exceeding 100 mm in diameter. Their composition includes porphyritic andesites, intensely epidotized and chloritized porphyritic andesites, fragments of indeterminate altered intrusive rocks and clasts with abundant iron oxide. The deposit is well cemented by salts, which, as in the case of Units C & D envelope the clasts, fill cavities and occur as aggregates or accumulations of salts formed by saline efflorescence.

 

6.1.9Unit F

 

Corresponds to the igneous basement of the sedimentary sequence. At Nueva Victoria this corresponds mainly to Cretaceous volcanic rocks, andesitic to dioritic lavas, and granitic bodies. The basement presents little mineralization of economic interest, this being restricted to fracture infills, where present.

 

Figure 6-3. Typical profile of the Qcp unit at Nueva Victoria.

 

 

 

Upper horizon of sulfate sediments, forming loose, readily wind-transportable "chusca" where it is weathered and leached at the ground surface. This unit varies in thickness in the range 0.5 – 0.9 m.

 
   
   
   
   
   
   
   
   
   
     
  Anhydrite nodules in a medium to coarse sand matrix. This unit typically varies in thickness in the range 0.5 – 1.0 m, but it may become laterally impersistent.  
   
   
   
   
   
   
     
  Horizon fine to medium-grained dark brown sandstones with intercalations of sedimentary breccias. This unit hosts economic mineralization. The thickness of the unit typically varies between 1.0 – 1.5 m.  
   
   
   
   
   
   
   
     
  Level of fine to medium-grained breccias. As in the case of Unit C, this unit hosts economic mineralization. The thickness of the unit varies between 1.0 - 3.0 m.  
   
   
   
   
   
   
   
       

 

SQM TRS Nueva Victoria Pag. 28

 

 

 

 

The Geology of the different sectors of Nueva Victoria corresponds mainly to sedimentary and volcano-sedimentary associations, on a Jurassic igneous crystalline Jurassic basement, related through sedimentation cycles, which could correspond to the distal facies of an alluvial fan, which vary in size from medium sand to fine gravel. In general, the facies found correspond to breccias, sandstones, andesites, intrusive, and tuffs. In the TEA and Hermosa sectors, salt crusts can be observed encasing sandstones, as well as cover of anhydrite, which is present in an irregular manner and with variable thicknesses. In the West Mine Sector, the anhydrite crust is much more frequent, reaching maximum thicknesses, of the order of metric. Figure 6-4 shows the location of the sectors that are described in detail.

 

Figure 6-4. Nueva Victoria Sectors

 

 

SQM TRS Nueva Victoria Pag. 29

 

 

 

 

6.1.10Tente en el Aire (TEA)

 

Morphologically, this deposit area is in a flat area (pampa) crossed by a NW-SE fault system and surrounded by volcanic outcrops. The low topographic relief has protected the evaporite deposits against erosive processes, particularly in the south and northeast of TEA. The western part of TEA has been affected by surface runoff that leached the caliche, making it soft, friable and porous and reducing its nitrate content. Lithologically TEA presents a sequence of sandstones and polymictic breccias over a volcanic basement. Salt crusts and variable thicknesses of anhydrite cover the sandstones (Figure 6-5).

 

The occurrence of mineralization corresponds to mineralized mantles (caliche) which typically vary in thickness in the range 3.0 – 3.5 m. 70% of TEA is covered by high-nitrate content, competent caliche, cemented by a high content of soluble salts. The remaining 30% of TEA is covered by reduced nitrate leached caliche of lower geomechanically quality.

 

Nitrate mineralization in TEA caliche is in the range 4.5 – 6.5% NaN03 with iodine is in the range 400 - 430 ppm I2.

 

SQM TRS Nueva Victoria Pag. 30

 

 

 

 

Figure 6-5. Schematic Cross section of TEA Deposit.

 

 

 

SQM TRS Nueva Victoria Pag. 31

 

 

 

 

6.1.11Torcaza

 

The Torcaza deposit area comprises an open pampa in the southeast, limited by volcanic outcrops to the west and by fluvial deposits to the east. Its geology comprises a sequence of fine-grained sandstones and medium-grained breccias, with a tendency to an increase in clast sizes with depth. The mineralized mantles of caliche are typically 2.5 – 3.2 m in thickness. Nitrate content is spatially variable. A Nitratine (NaNO₃) horizon can be identified in the stratigraphic sequence between the sandstone and breccia subunits, deposited by mineral-rich groundwaters
(Figure 6-6).

 

The nitrate grade at Torcaza is in the range 4.0 – 6.0 % NaN03 and the iodine grade is in the range 350 - 430 ppm.

 

Figure 6-6. Stratigraphic Cross Section of Torcaza sector

 

 

 

SQM TRS Nueva Victoria Pag. 32

 

 

 

 

6.1.12Hermosa

 

The Hermosa deposit area comprises a closed basin crossed by a system of NW-SE faults. It is and area of gently undulating relief with areas of salt accumulation. It is limited by volcanic outcrops to the west and north. The gentle topographic relief has limited erosion. The geology at Hermosa comprises a sequence of medium-grained sandstones and polymictic breccias over oligomictic breccias resting on volcanic basement (Figure 6-7).

 

The mineralized mantles (caliche) at Hermosa typically vary in thickness in the range 3.5 – 4.0 m. 90% of Hermosa is covered by high-nitrate content, competent caliche, cemented by a high content of soluble salts. The remaining 10% of Hermosa is covered by reduced nitrate leached caliche of lower geomechanically quality.

 

Nitrate mineralization in Hermosa caliche is in the range 5.5 – 7.5 % NaN03, with iodine is in the range 400 - 450 ppm I2.

 

Figure 6-7. Stratigraphic Column and Schematic cross section of Hermosa Sector.

 

 

SQM TRS Nueva Victoria Pag. 33

 

 

 

6.1.13West Mine

 

The West Mine corresponds to an open Pampa to the southeast located in an alluvial environment, limited by volcanic outcrops to the west and by fluvial deposits to the east. Lithologically, the sector is formed by a sequence of fine sandstones and medium breccias with an increase of clasts at depth. And anhydrite crust is present in this sector and is much more frequent than in other sectors, reaching the maximum thicknesses, of order metric (Figure 6-8).

 

Like the Torcaza deposit area, the West Mine deposit area comprises an open pampa in the southeast, limited by volcanic outcrops to the west and by fluvial deposits to the east. Its geology comprises a sequence of fine-grained sandstones and medium-grained breccias, with a tendency to an increase in clast sizes with depth.

 

At West Mine, the anhydrite crust is more prominent and laterally persistent than in the other deposit areas and may attain a thickness of the order of a 1 m.

 

The mineralized mantles of caliche are a little thinner than in TEA and Hermosa, generally attaining a thickness in the range 2.0 – 2.5 m. The caliche has been subject to leaching which has reduced its nitrate content and geomechanically competence.

 

The nitrate grade at West Mine is in the range 3.5 – 5.5 % NaN03 and the iodine grade is in the range 350 - 450 ppm.

 

6.1.14North Mine

 

The North Mine deposit area corresponds to a raised block, bounded to the east by the Sur Viejo salt flat.

 

The caliches of this sector have suffered salt remobilization and erosion, reflected in the lower nitrate content and reduced thickness of the caliche. Lithologically, the caliches correspond to sandstones and breccias with high quartz contents, which makes them highly abrasive. Figure 6-9 presents the stratigraphic column and a cross section for North Mine.

 

The caliche mantles present average thicknesses of 2.0 – 2.2 m. The geomechanically quality of the caliches in this sector is generally high, except locally where they are cut by faults which may result in significant clay content.

 

As for the West Mine deposit area, the nitrate grade at North Mine is in the range 3.5 – 4.5 % NaN03 and the iodine grade is in the range 400 - 450 ppm.

 

SQM TRS Nueva Victoria Pag. 34

 

 

 

 

Figure 6-8. Schematic Cross section of West Mine Sector.

 

 

SQM TRS Nueva Victoria Pag. 35

 

 

 

 

Figure 6-9. Schematic Cross Section of North Mine Sector.

 

 

SQM TRS Nueva Victoria Pag. 36

 

 

 

 

6.1.15South Mine

 

The South Mine deposit area corresponds to a tectonically uplifted basin, bounded to the east by the Sur Viejo salt flat. The South Mine deposit area was enriched by surface water runoff after mineralization which favored the remobilization of soluble salts and enrichment with chlorides, sulfates, potassium, calcium, and sodium. The geology of South Mine comprises a sequence of anhydrites, sandstones and polymictic breccias over siltstones with variable clay content.

 

The caliche mantles reach average thicknesses of 2.0 meters. Their geomechanically quality is generally high, except locally where they are cut by faults which may result in significant clay content.

 

The nitrate grade at South Mine is lower than at North Mine and West Mine, being in the range 2.5 – 3.5 % NaN03, although the iodine grade is a little higher at 400 - 500 ppm.

 

Mineralization

 

Table 6-1 presents a summary of the mineralogy of the Nueva Victoria Property. The number of samples included in the database on which the table is based are indicated by the “n = “value in the table header. TEA has by far the greatest number of samples with n = 226. An “X” indicates the presence of the mineral in the samples of the sector. In the case of TEA, the proportion of the 226 samples analyzed in which the mineral of intertest was recorded are indicated as percentage. The table uses the following color coding to indicate the percentage content by mass of dry sample of each mineral of interest:

 

Red fill indicates that the mineral accounts for 10% or greater of the mass of the dry samples.

 

Orange fill indicates that the mineral accounts for between 5% and 10% of the mass of the dry samples.

 

Yellow fill indicates that the mineral accounts for between 1% and 5% of the mass of the dry samples.

 

An “X” in a cell with no color fill indicates that the mineral of interest accounts for less than 1% of the mass of the dry samples.

 

SQM TRS Nueva Victoria Pag. 37

 

 

 

 

Table 6-1. Mineralogy of Nueva Victoria Caliches.

 

Group

Mineral
(Spanish name in brackets)

Formula

Pampa Blanca
(n = 10)

South
Mine
(n = 21)

West
Mine
(n = 6)

North Mine
(n = 21)

North Mine
Gravels
(n = 2)

TEA
(n = 226)

TEA Gravels
(n = 3)

Nitrates Nitratine (Nitratina) NaNO3 X X X X X X (79%) X
Darapskita (Darapskita) Na3(SO4)(NO3).H2O X X       X (6%)  
Saltpetre (Nitrato potassic) KNO3   X          
Iodates Lautarite (Lautarita) Ca(IO3)2   X       X (9%) X
Hectorfloresite (Hectorfloresita) Na9(IO3)(SO4)4   X       X (59%) X
Fuenzalidaita K6(Na, K)4Na6Mg10(SO4)12(IO3)12.12H2O           X (8%)  
Bruggenite   Ca(IO3)2.H2O           X (25%)  
Chlorides Halite NaCI X X X X X X (82%) X
Sylvite KCI   X          
Potassium-rich halite (K, Na)CI   X          
Sulfates Anhydrite CaSO4 X X X X   X (76%)  
Glauberite Na2Ca(SO4)2 X X X X X X (21%) X
Loeweite, Na12Mg7(SO4)13.15H2O X X X     X (13%)  
Polyhalite K2Ca2Mg(SO4)4.2H2O   X X X X X (81%) X
Kieserite MgSO4.H2O X X       X (55%)  
Astrakanit Na2Mg(SO4)2.4H2O   X X X X X (78%) X
Humberstonita K3Na7Mg2(SO4)6(NO3)2.6H2O   X   X X X (8%)  
Hexahydrite MgSO4.6H2O   X     X X (55%)  
Epsomite MgSO4.7H2O           X (4%)  
Gypsum CaSO4.2H2O X X   X X X (15%) X
D'Ansite Na21Mg(SO4)10Cl3           X (0.4%)  
Bassanite 2(CaSO4).H2O   X          
Mirabilite Na2SO4.10H20)             X
Cesanite Ca2Na3(OH)(SO4)3             X
Thenardite Na2SO4   X          
Pentahydrite MgSO4.5H2O   X          
Vanthoffite Na6Mg(SO4)4   X          
Silicates Silicate minerals generally   X X X X X X X

 

SQM TRS Nueva Victoria Pag. 38

 

 

 

 

Deposit Types

 

6.1.16Genesis of Caliche Deposits

 

Wetzel (1961) postulated that nitrate deposits are enriched in salts by mudflow events. Mueller (1960) supported the theory of Singewald and Miller (1916) which cited accumulation by capillary rise and evaporation of groundwater at the margins of salt flats. Fiestas (1966) suggested that reactions between acids from volcanic gas clouds and the rocks and soils of the nitrate fields was important in the genesis of the mineral salts concentrated within the caliche deposits. Ericksen (1975) proposed that the mineral salts have a mainly atmospheric origin, the product of dry atmospheric precipitation of mineral salt aerosols carried inland from the coast; the aerosols being derived from marine spray at the ocean surface / atmosphere interface, particularly from waves in the breaker zone of the coast. In 1963, working with condensed fog samples, he demonstrated that the coastal fogs of northern Chile contain mineral salts which could be an important source of mineral salts that subsequently become concentrated over time by leaching and evaporation, forming economic caliche deposits.

 

Authors such as Pueyo et al. (1998) and Reich et al. (2003) describe mechanisms for the genesis of saline groundwaters and brines, which can give rise to the generation of caliche deposits in porous host rocks such as sandstones and breccias, though processes of concentration, primarily evapo-concentration, by the evaporation of water from the capillary fringe of shallow water tables. The soluble mineral salts first enter the source water via the leaching of altered rocks and pre-existing saline materials. They emphasize the role the hydrological system operating over long periods of time in the leaching and transport of the salts, including during periods of former wetter climate (hydrological paleo system).

 

Current thinking is that the mineral salts of most economic caliche deposits in the arid north of Chile, except for a few specific cases of marine evaporite deposits, have a dominantly volcanic origin. Chong (1991) noted that the leaching of volcanic materials would have been favored by thermal processes related to the middle Tertiary volcanic arc. Álvarez (2016) explained how groundwater leaching of iodine from iodine bearing organic-rich rocks may constitute an important origin of iodine in caliche deposits.

 

6.1.17Nueva Victoria

 

The mineralization at Nueva Victoria is mantiform, with distinct deposit areas of several kilometers in extension. Mineralized mantle (caliche) thicknesses vary between deposit areas, falling within the range 1.0 – 6.0 m. Because of the action of geological processes over time (weathering, erosion, faulting, volcanism) the caliche deposits can take a variety of forms, including, as detailed below.

 

SQM TRS Nueva Victoria Pag. 39

 

 

 

 

6.1.18Continuous Mantles

 

Laterally continuous mineralization hosted in sandstones and breccias; presenting caliche thicknesses generally in the range 2.0 – 4.0 m, but occasionally reaching up to 6.0 m. Nitrate grades tend to be highest where the caliche is thickest. Iodine grades tend to reduce at depth. The caliche mantles may be cut by fractures filled with cemented sands (sand dikes). Secondary deposition of mineral salts may be observed along bedding plane contacts.

 

6.1.19Thin salt Crusts and Superficial Caliche

 

Evaporite deposits presenting as thin (0.5 to 1.2 m), laterally discontinuous mineralization, often developed within and over fine-grained sandstones of high competence. Nitrate grades in these thin deposits can reach 20% and iodine can attain values of 1,500 ppm.

 

6.1.20Stacked caliches.

 

This type of deposit is found in sectors with a high degree of leaching. It is particularly associated with alluvial fans. The leaching of the overlying material reduces its degree of cementation and geomechanical competence and reduces the grade of economic mineralization that it contains. Reprecipitation of the leached minerals at depth in the formation (e.g., alluvial fan) results in better-cemented, geomechanically more competent, more mineralized caliches at depth. The thickness of these mineralized caliches is variable, but is generally around 2.0 m. Generally, the mineral grades of these caliches are lower than the other caliche deposit styles.

 

6.1.21Other Economic Mineralization

 

Most of the economic nitrate and iodine mineralization associated with caliche mantles occurs as:

 

Envelopes around the sedimentary clasts (sand and gravel grains) of host sandstones, breccias and conglomerates.

 

Filling of the pore space between the sedimentary clasts.

 

Evaporite aggregates due to saline efflorescence.

 

Economic mineralization may also manifest itself in the following ways:

 

Cutting the caliche mantles as fracture infills (sand dikes).

 

Veins of 0.5 to 1.0 m thickness associated with sediment - lava contact surfaces.

 

As veins of 0.5 to 1.0 m thickness in volcanic rocks.

 

As veins in altered or fractured volcanic rocks.

 

SQM TRS Nueva Victoria Pag. 40

 

 

 

 

The nitrate deposits at Nueva Victoria are located on the western edge of the Intermediate Basin, formed mainly by surface or shallow horizontal to sub-horizontal strata of clastic sedimentary rocks (sandstones, breccias and conglomerates) which have been mineralized by solutions rich in mineral salts (nitrates, chlorides, iodates) to form caliche deposits found in large horizontal layers, ranging in thickness from 1 to 4 m, with barren material (overburden) ranging from 0.0 to 2.0 m at the top.

 

SQM TRS Nueva Victoria Pag. 41

 

 

 

 

7Exploration

 

Nueva Victoria is an active mine operation. Ongoing exploration is conducted by SQM with primary purpose of supporting mine operations and increasing estimated Mineral Resources. The exploration strategy is focused on have preliminary background information on the tonnage and grade of the ore bodies and will be the basis for decision making for the next Recategorization campaigns. Exploration work was completed by mine personnel.

 

Surface samples

 

SQM does not collect surface samples for effect of exploration.

 

Topographic Survey

 

Detailed topographic mapping was created in the different sectors of Nueva Victoria by aerial photography, using an unmanned aircraft operated by remote control, Wingtra One (Figure 7-1); equipment with 42 Mega pixels resolution, maximum flight altitude 600 m, flight autonomy 40 minutes. The accuracy in the survey is 15 to 10 cm.

 

The measurement was contracted to STG since 2015.

 

Figure 7-1. Wingtra One Fixed-Wing Aircraft

 

 

Prior to 2015, the topography survey was done by data measurement profiles every 25 meters; these profiles were done by walking and collecting information from points as the land surveyor made the profile. With this information, the corresponding interpolations were generated to obtain sector surfaces and contour lines.

 

SQM TRS Nueva Victoria Pag. 42

 

 

 

 

Drilling Methods and Results

 

The Nueva Victoria geologic and drill hole database included 96,532 holes that represented 390,802 m of drilling. Table 7-1 summarizes the drilling by sector. Figure 7-2 shows the drill hole locations. As for the type of drilling used, it corresponds to RC holes, with a maximum depth of 7 meters. All the Nueva Victoria drilling was done with vertical holes.

 

Table 7-1. Detail of the Number of Drill Holes and Total Meters Drilled by sector in Nueva Victoria, Iris, and Soronal Properties

 

SQM Property Sector EIA Grid N° of Drill Holes Total Meters Core Recovery (%)
Soronal Fortuna Hermosa 100 1,021 5,105 No Data
Hermosa Hermosa 100 - 100T 8,350 41,695 89
Tente en el Aire Hermosa 100 - 100T - 200 7,313 36,565 89
Hermosa Oeste TEA 200 - 400 1,496 8,637 84
Coruña Hermosa 100 1,038 6,228 No Data
TEA Oeste TEA 200 - 400 560 3,360 85
TEA Sur TEA 100T 1,165 6,336 87
Cocar TEA 100 - 200 1,015 5,075 No Data
Pampa Engañadora TEA 200 - 400 1,225 7,350 82
Franja Oeste TEA 200 - 100T 4,009 19,985 83
Nueva Victoria & Iris Oeste 3 TEA 50 - 100 485 2,183 84
Mina Oeste Nueva Victoria 50 - 100 18,350 64,225 90
Mina Norte Nueva Victoria 50 - 100 21,165 74,078 83.5
Mina Sur Nueva Victoria 50 - 100 24,115 84,403 94
Iris Vigia Nueva Victoria 200 - 100T 825 3,578 87
Torcaza Torcaza 50 - 100 - 200 4,400 22,000 88.1
        96,532 390,802  

 

The drilling campaigns were carried out according to the resource projection priorities of the Superintendence of Mineral Resources and LP Planning. Subsequently, this prospecting plan was presented to the respective VPs to ratify if they comply with the reserve projections to be planned, if they do not coincide, the prospecting plan is modified.

 

SQM TRS Nueva Victoria Pag. 43

 

 

 

Figure 7-2. Drill hole location map

 

 

SQM TRS Nueva Victoria Pag. 44

 

 

 

Drilling at Nueva Victoria was completed with prospecting grids of 400 x 400 m, 200 x 200 m, 100 x 100 m, 100 locked and 50 x 50 m.

 

7.1.1Grid > 400 m

 

Areas that have been recognized and that present some mineralization potentials are initially prospected in wide mesh reverse air holes, generally greater than 400 m with variable depths of 6 to 8 m depending on the depth at which the ore is encountered. In consideration of the type of grid and the fact that the estimations of tonnage and grades are affected in accuracy, this resource is defined as a Hypotheticals and Speculative Resources, exploration target grid > 400 m.

 

7.1.2400 m Grid

 

Once the Inferred sectors with expectations are identified, 400 x 400 m prospecting grids are carried out. In areas of recognized presence of caliche or areas where 400 x 400 m grid drilling is accompanied by localized closer spaced drilling that confirms the continuity of mineralization, the 400m grid drilling provides a reasonable level of confidence and therefore define dimensions, thickness, tonnages, and grades of the mineralized bodies, used for defining exploration targets and future development. The information obtained is complemented by surface geology and the definition of geological units. This area is used to estimated Inferred Resources. In other cases when there is no reasonable level of confidence the 400 x 400 m grid will be defined as a Potential Resource.

 

7.1.3200m and 100m Grid

 

Subsequently, the potential sectors are redefined, and the 200 x 200 m and 100 x 100 m prospecting grid is carried out, which in this case allows to delimit, with a significant level of confidence, the dimensions, power, tonnage, and grades of the mineralized bodies as well as the continuity of the mineralization. At this stage, detailed geology is initiated, the definition of geological units on surface continues to be complemented and sectors are defined to carry out geometallurgical assays. This area is used to estimated Indicated Mineral Resources

 

7.1.4100T and 50m Grid

 

The 50 x 50 m and 100T ~ 100x50 m prospecting grid allows to delimit with a significant level of confidence (amount of information associated to the drilling grid) the dimensions, powers, tonnages, and grades of the mineralized bodies as well as the continuity of the mineralization. The definition of geological units and collect information on geometallurgical assays from the pilot plants depending on the prospecting site is then continued. This area is used to estimate Measured Mineral Resources.

 

The results of the drilling campaigns in the sector of North Mine and South Mine can be seen in Figure 7-3, where it is highlighted in red the sectors with nitrates greater than 5.0%, in green the nitrates between 3.0 – 5.0% and in yellow the nitrates less than 3.0%. The mineralized bodies at Mina Norte and Sur are distributed in a discontinuous and irregular distribution, with a higher concentration of nitrate mineralization in the central and western portion of the North mine, as well as in the southern and south-western part of the South mine.

 

SQM TRS Nueva Victoria Pag. 45

 

 

 

 

Figure 7-3. Iso-Nitrate Map Nueva Victoria of North and South Mine Sector

 

 

 

SQM TRS Nueva Victoria Pag. 46

 

 

 

 

The results of the drilling campaigns in the West Mine sector are shown in Figure 7-4. As shown, the red highlight represents sectors with nitrates greater than 5.0%. The green highlight represents the nitrates between 3.0 – 5.0%, and the yellow highlight denotes the nitrates less than 3.0%. The mineralized bodies in West Mine are distributed in a discontinuous and irregular way in almost its totality, presenting a greater mineralized volume in the central portion.

 

Figure 7-4. Iso-Nitrate Map Nueva Victoria West Mine Sector

 

 

SQM TRS Nueva Victoria Pag. 47

 

 

 

 

The results of the drilling campaigns in the TEA and Hermosa sectors are shown in Figure 7-5. Sectors with nitrates greater than 5.0% are highlighted in red, nitrates between 3.0 – 5.0% in green, and nitrates less than 3.0% in yellow. The mineralized bodies in TEA and Hermosa show greater continuity in nitrate mineralization in the central, north-east, and south-east portions, being the west sector of low continuity and greater irregularity.

 

Figure 7-5. Iso-Iodine Map Nueva Victoria; TEA and Hermosa Sector

 

 

SQM TRS Nueva Victoria Pag. 48

 

 

 

 

The results of the drilling campaigns in the Torcaza sector are shown in Figure 7-6. Sectors with nitrates greater than 5.0% are highlighted in red, nitrates between 3.0 – 5.0% in green and nitrates less than 3.0% in yellow. The mineralized bodies at Torcaza are continuous and regular in the eastern portion, while in the western portion, the mineralization is discontinuous and irregular.

 

Figure 7-6. Iso-Iodine Map Nueva Victoria TEA en Torcaza sector

 

 

 

SQM TRS Nueva Victoria Pag. 49

 

 

 

7.1.52022 Campaigns.

 

SQM has an ongoing program of exploration, recategorization and resource evaluation in the areas surrounding the Nueva Victoria mine, which is currently in operation. SQM has performed reconnaissance drilling at 400 m spacing or lower in 18.91% of the area covered by its mining properties over the areas with caliche interest. (Table 7-2 and Table 7-3).

 

In 2022, a Mineral Resource recategorization project was carried in the TEA sector and its surroundings, to have exploitable Mineral Reserves for the development of the Five-Year Plan.

 

For this purpose, 5,957 drill holes representing 31,523 m were carried out, at an estimated cost of 115.7 USD/m; obtaining total salt analysis sample by sample. With this information, the TEA SUR, Franja Oeste, Hermosa Oeste, Iris Vigia and Pampa Blanca will be recategorized, expecting to obtain resources for 44 Mt.

 

Table 7-2. Meters Drilled in Campaigns 2022

 

Project / Area Holes Drilled Total Meters
TEA Sur 995 5,316
Franja Oeste 2,579 12,835
Hermosa Oeste 284 1,365
Iris Vigia 285 1,418
Pampa Blanca 1,814 10,589
Total 5,957 31,523

 

Table 7-3. Campaigns 2022 Average NaNO3 and I2

 

Project / Area Holes Drilled Average NaNO3 (%) Average I2 (ppm)
TEA Sur 995 4.3 403
Franja Oeste 2,579 4.1 401
Hermosa Oeste 284 5.8 428
Iris Vigia 285 3.3 406
Pampa Blanca 1,814 5.8 491
Total 5,957 4.7 430

 

7.1.6Exploration Drill Sample Recovery

 

Core recovery has been calculated for all RC holes completed to date. In historical campaigns, the recovery was lower due to the type of drilling rig used.

 

SQM TRS Nueva Victoria Pag. 50

 

 

 

Since 2015, the drilling equipment was adapted, which allowed a decrease in the loss of material and consequently an improvement in sample recoveries. It should be noted that the recoveries are above 80%, a value that fluctuates in direct relation to the degree of competence of the rock to be drilled, having for example lower recoveries in Franja Oeste and Pampa Engañadora, which present semi-soft caliches of low compaction. Sectors such as Hermosa and TEA have recoveries close to 90% as they correspond to caliche sectors with high competition and mineralization. Table 7-4 details the recovery percentages by sector in Nueva Victoria. Recoveries in sectors such as Fortuna and Cocar correspond to historical campaigns where there is no recovery information.

 

Table 7-4. Recovery Percentages at Nueva Victoria by Sectors

 

SQM Property Sector EIA Grid N° of Drill Holes Total Meters Core Recovery (%)
Soronal Fortuna Hermosa 100 1,021 5,105 No Data
Hermosa Hermosa 100 - 100T 8,350 41,695 89
Tente en el Aire Hermosa 100 - 100T - 200 7,313 36,565 89
Hermosa Oeste TEA 200 - 400 1,496 8,637 84
Coruña Hermosa 100 1,038 6,228 No Data
TEA Oeste TEA 200 - 400 560 3,360 85
TEA Sur TEA 100T 1,165 6,336 87
Cocar TEA 100 - 200 1,015 5,075 No Data
Pampa Engañadora TEA 200 - 400 1,225 7,350 82
Franja Oeste TEA 200 - 100T 4,009 19,985 83
Nueva Victoria & Iris Oeste 3 TEA 50 - 100 485 2,183 84
Mina Oeste Nueva Victoria 50 - 100 18,350 64,225 90
Mina Norte Nueva Victoria 50 - 100 21,165 74,078 83.5
Mina Sur Nueva Victoria 50 - 100 24,115 84,403 94
Iris Vigia Nueva Victoria 200 - 100T 825 3,578 87
Torcaza Torcaza 50 - 100 - 200 4,400 22,000 88.1
        96,532 390,802  

 

7.1.7Exploration Drill Hole Logging

 

For all the samples drill hole logging was carried out by external and internal personnel, which was done in the field. Since 2015 ARVI Mining Limited is the company in charge of logging activities in Nueva Victoria. SQM personnel validated the logs through periodic reviews. Logging procedures used documented protocols. Geology logging recorded information about rock type, mineralogy, alteration and geomechanics.

 

The logging process included the following steps:

 

Measurement of the “destace” and drill hole using a tool graduated in cm.

 

Mapping of cutting (RC) and/or drill hole cores (DDH), defining their color, lithology, type and intensity of alteration and/or mineralization.

 

Determination of geomechanical units à Leached, smooth, rough and intercalations.

 

SQM TRS Nueva Victoria Pag. 51

 

 

 

The information is recorded digitally with a Tablet and/or computer, using a predefined format with control system and data validation in Acquire. This Platform was incorporate by SQM as database administrator for all its sites in 2022.

 

The Supervisor Logging Geologist from external contractor was responsible for:

 

Generate geological data of the highest possible quality and internal consistency, using established procedures and employing System in Acquire.

 

Locate and verify information of work to be mapped.

 

Execute geomechanical and lithological drill hole mapping procedures.

 

Supervise field activities. And coordinate and report permanently to SQM personnel on the progress and execution of the work carried out according to the program.

 

7.1.8Exploration Drill Hole Location of Data Points

 

The process of measuring the coordinates of drill holes collars was performed, in 2 stages. Prior to the drilling of the drill holes, the geology area generates a plan and list with the number of drill holes by Acquire, to be marked and coordinates to the personnel of the external contractor of the STG company. A Land surveyor measured the point in the field and identifies the point with a wooden stake and an identification card with contain barcode with information of number of drill hole recommended, coordinates and elevation.

 

Holes are surveyed, after drilling, with GNSS equipment, for subsequent processing by specialized software with all the required information. Once the complete campaign is finished, the surveyed data was reviewed, and a list was sent with the drill id information and its coordinates.

 

Collar coordinates were entered into Microsoft® Excel sheets and later aggregated into a final database in Acquire by personnel from the SQM.

 

At the completion of drilling, the drill casing was removed, and the drill collars were marked with a permanent concrete monument with the drill hole name recorded on a metal tag on the monument.

 

7.1.9Qualified Person’s Statement on Exploration Drilling

 

The Qualified Person believes that the selection of sampling grids of gradually decreasing spacing as Mineral Resources areas are upgrades from Inferred to Measured Mineral Resources and as they are further converted to Proven, and Probable Mineral Reserves where production plans have been applied, is appropriate and consistent with good business practices for caliche mining. The level of detail in data collection is appropriate for the geology and mining method of these deposits.

 

SQM TRS Nueva Victoria Pag. 52

 

 

 

 

8Sample Preparation, Analysis and Security

 

Site Sample Preparation Methods and Security

 

Analytical samples informing Nueva Victoria Mineral Resources were prepared and assayed at the Iris plant and Internal Laboratory located in city of Antofagasta.

 

All sampling was completed by the external operators. Based on review of the procedures during the site visit and subsequent review of the data, it is the opinion of the QP that the measures taken to ensure sample representativeness were reasonable for estimating Mineral Resources.

 

8.1.1RC Drilling

 

The RC drilling is focused on collecting lithological and grade data from the “Caliche mantle”. RC Drilling was carried out with a 5 ½ inch diameter by an external company "Perforations RMuñoz" under the supervision of SQM, both parties were coordinate to establish the drilling points. Once the drilling point was designated, the positioning of the drilling rig was surveyed, and the drill rig was set up on the surveyed drill hole location. (A and B).

 

Once set up, drilling commenced (Figure 8-1 C). At the beginning of each drill hole, the drilling point was cleaned or uncovered, eliminating the soft overburden, or chusca, with a backhoe.

 

Samples were collected from the cyclone at continuous 50 cm intervals in plastic bags. The samples were weighed and quartered at the platform. A cutting sample was taken and left on the floor as a control sample. The sample bag was tied, and a number card was inserted. (Figure 8-1 D).

 

Figure 8-1. A) Drilling Point Marking B) Drill Rig Positioning C) RC Drilling D) RC Samples at Platform

 

 

SQM TRS Nueva Victoria Pag. 53

 

 

 

 

Samples were transported by truck to the plant for mechanical preparation and chemical analysis. Samples were unloaded from the truck in the correct correlative order and positioned on Pallets supplied by the plant manager. (Figure 8-2).

 

Figure 8-2. A) Transportation Truck. B) Pallets with RC Samples

 

 

SQM TRS Nueva Victoria Pag. 54

 

 

 

8.1.2Sample Preparation

 

Mechanical sample preparation was carried out by Pilot Plant Iris V7 located at Nueva Victoria. Sample preparation includes (Figure 8-3)

 

Division of the sample in a cone splitter into 2 parts, one of which corresponds to discard. The sample obtained should weigh between 1.0 to 1.8 kg.

 

Drying of the sample in case of humidity.

 

Sample size reduction using cone crushers to produce an approximately 800 g sample passing a number 8 mesh (-#8).

 

Division of the sample in a Riffle cutter of 12 slots of ½" each. The sample is separated in 2, one of them corresponds to rejection and the other sample must weigh at least 500 g.

 

Sample pulverizing.

 

Packaging and labeling, generating 2 bags of samples, one will be for the composites in which 200 g are required (original) and the other will be for the laboratory, in which 150 g are required. (Figure 8-4).

 

Insertion points for quality control samples in the sample stream were determined. Standards samples were incorporated every 60 samples and duplicates every 20 samples, including the first sample. Samples were shipped in boxes containing a maximum of 65 samples (weighing approximately 15 kg) to the Caliche Iodine Internal laboratory.

 

SQM TRS Nueva Victoria Pag. 55

 

 

 

 

Figure 8-3. Sample Preparation Flow Diagram

 

 

Figure 8-4. A) Sample Division B) Cone Crusher C) Riffle Cutter D) Sample Pulverizing E) Packaging

 

 

SQM TRS Nueva Victoria Pag. 56

 

 

 

 

Laboratories, Assaying and Analytical Procedures

 

Chemical analysis for NO3 an iodine was performed at the Caliche Iodine laboratory, located Antofagasta. Which is ISO 9001:2015 certified in shippable iodine, replicated in caliche and drill holes.

 

The caliche iodine laboratory has capacity to analyze 350 samples/day for nitrate and iodine analysis. Sample handling, from receipt to analysis, is performed in 4 areas:

 

Receiving and pressing area

 

Nitrate area

 

Redox volumetric area

 

XRF Equipment area

 

Nitrate analysis was performed by UV-Visible Molecular Absorption Spectroscopy. The minimum concentration entered the laboratory information Management System (LIMS) system was 1,0%, the result was expressed in % of NaNO3. Iodine analysis was performed by Redox volumetric and X-ray Fluorescence. The minimum concentration reported to the LIMS system was 0,005%.

 

Results, QC Procedures and QA Actions

 

8.1.3Laboratory Quality Control

 

To validate the results of the laboratory analysis, the following control measures were carried out (Figure 8-5)

 

Iodine:

 

Prepare a reference standard .

 

Use of primary reference material.

 

Measure the reference standard and the reagent blank to ensure the quality of the reagents used.

 

Every 10 samples a QC of 5 g/L prepared with a salt of a NaNO3.

 

Of the obtained result should not exceed 2% of the nominal value of the QC, otherwise the variables should be revised, and the analysis of the batch should start from the beginning.

 

Nitrate:

 

Analyze at the beginning of the sample set a standard solution.

 

Every 5 samples a QC of 8 g/L prepared with a solution of 1 mg/L of a NaNO3 salt is measured, the variation of the obtained result should not exceed 5% of the nominal value of the QC, otherwise the variables should be revised, and the analysis of the batch should start from the beginning.

 

SQM TRS Nueva Victoria Pag. 57

 

 

 

 

Figure 8-5. Flow Chart for Approval of Laboratory Chemical Analysis Results

 

 

 

8.1.4Quality Control and Quality Assurance Programs (Qa-Qc)

 

Qa/Qc programs were typically set in place to ensure the reliability and trustworthiness of the exploration data. They include written field procedures of aspects such as drilling, surveying, sampling, and assaying, data management, and database integrity.

 

Analytical control measures typically involved the internal laboratory control measures implemented to monitor the precision and accuracy of the sampling, preparation, and assaying. Assaying protocols typically involve regular duplicate assays and insertion of Qc samples.

 

SQM has a systematic QA/QC program controlled by Acquire; which included the insertion of different control samples into the sampling stream:

 

Coarse duplicate à 2% (1 every 50).

 

Analytical duplicate à 5% (1 per 20).

 

Standard à 1.7% (1 per 60).

 

Acquire and LIMS software managed the quality control by automatically checking the refined control samples and the Standards entered the system, generating warnings at the time of analysis.

 

SQM TRS Nueva Victoria Pag. 58

 

 

 

2017 to 2020

 

The results of the QAQC program for the Nueva Victoria Sector from 2017 to 2020 and Hermosa sectors are detailed below.

 

Table 8-1 details the number of samples inserted for each of the controls and the variables analyzed.

 

Table 8-1. Number of Control Samples for Campaigns from 2017 to 2020 for Nueva Victoria Sectors.

 

Sector Year Control Type Variable
Coarse Duplicate Standard Duplicates Nitrate Iodine
TEA 2017 298   298 x x
TEA 2018-2019 492 630 1,815 x x
Hermosa 2019-2020 559   559 x x

 

a)TEA 2017

 

For the 2017 campaign, 298 coarse duplicates were inserted. Nitrate gives a good precision without bias. (Figure 8-6 and Table 8-2). Iodine presents low concentrations (ppm), so a lower precision is observed probably due to a nugget type effect, however no bias is observed (Figure 8-7 and Table 8-3).

 

SQM TRS Nueva Victoria Pag. 59

 

 

 

 

Table 8-2. Coarse Duplicates for Nitrate TEA 2017

 

Statisticians Nitrate Grade % Difference Error
Original Check Original - Check
Number 298 298    
Mean 4.0 4.2 0.135 0.091
Stand. Deviation 3.39 3.46 1.56  
% Difference 103.35
Test T 0.137
Minimum 1.0 1.0    
Percentile 25 2.0 2.1    
Median 2.9 3.1    
Percentile 75 4.6 4.8    
Maximum 20.0 20.0    
Correlation Index   0.90    

 

Figure 8-6. Scatterplot for Nitrate - Coarse Duplicates- TEA 2017

 

 

SQM TRS Nueva Victoria Pag. 60

 

 

 

Table 8-3. Coarse Duplicates for Iodine-TEA 2017

 

Statisticians Iodine Grade ppm Difference

Error

 

Original Check Original -
Check
Number 298 298    
Mean 285.1 285 -0.067 6.03
Stand. Deviation 229.86 213.83 103.94  
% Difference 99.98    
Test T 0.99
Minimum 50 50    
Percentile 25 140 130    
Median 220 230    
Percentile 75 360 390    
Maximum 1,660 1,270    
Correlation Index   0.89    

 

SQM TRS Nueva Victoria Pag. 61

 

 

 

 

Figure 8-7. Plots for Iodine - Coarse Duplicates TEA 2017

 

 

b)TEA 2018 -2019

 

Coarse Duplicate:

 

The analysis of the drilling campaign conducted at TEA shows that for Nitrate good precision is observed with no apparent bias. Iodine shows low concentrations (ppm), with lower precision, probably due to a nugget type effect, however no bias is observed. (Figure 8-8 and Table 8-4).

 

Table 8-4. Coarse Duplicates for Iodine and Nitrate TEA 2018-2019

 

Statisticians   Statisticians
Iodine ppm Original Duplicate Difference   Nitrate % Original Duplicate Difference
Number 492 492     Number 492 492  
Average 3.1 3.1 0.0   Average 277.1 269.5 7.6
Median 2.4 2.4 0.0   Median 260 250 10
Variance 5.5 5.9 0.5   Variance 10,967.7 11,821.3 2,968.4
Max 19.7 20.0 2.2   Max 820 770 190
Min 1.0 1.0 -2.5   Min 50 70 -170
                 
Test T -0.277       Test T -0.001    
Corr. Coefficient 0.96       Corr. Coefficient 0.87    

 

SQM TRS Nueva Victoria Pag. 62

 

 

 

Figure 8-8. Plots for Iodine and Nitrate - Coarse Duplicates- TEA 2018-2019

 

Nitrate Coarse Core

 

 

Iodine Coarse Core

 

 

SQM TRS Nueva Victoria Pag. 63

 

 

 

Standard:

 

The ranges of variation of the analyses with respect to the standards used by SQM vary in nitrate by ± 0.35 to ± 0.53 % and for iodine ± 50 to ± 60 ppm. (Table 8-5).

 

Table 8-5. Standards Results - TEA 2018-2019

 

Nitrate %     Iodine  ppm  
             
Date Rank +/- Data   Date Rank +/- Data
Sept-18 0.35 87   Sept-18 60 87
Oct-18 0.53 87   Oct-18 60 87
Nov-18 0.45 66   Nov-18 50 66
Dec-18 0.46 114   Dec-18 50 114
Jan-19 0.46 163   Jan-19 50 163
Fec-19 0.46 113   Fec-19 50 113
             
Total Data 630   Total Data 630

 

Fine duplicates:

 

The ranges of variation of the analyses present a very good performance for nitrate and for iodine, showing no biases and with very good correlation between the original sample and the duplicate sample (Figure 8-9 and Table 8-6).

 

Table 8-6. Fine Duplicates for Iodine-and Nitrate TEA 2018-2019

 

Statisticians   Statisticians
Nitrate % Original Duplicate Difference   Iodine ppm Original Duplicate Difference
Number 1,815 1,815     Number 1,815 1.815  
Average 3.38 3.38 -0.01   Average 290 290 0
Median 2.5 2.5 0   Median 260 250 0
Variance 6.75 6.78 0.03   Variance 33,106 33,968 1,141
Max 22.7 22.9 0.5   Max 2,500 2,530 130
Min 1.0 0.2 -0.6   Min 20 20 -140
                 
Test T -0.062       Test T -0.411    
Corr. Coefficient 0.99       Corr. Coefficient 0.98    

 

SQM TRS Nueva Victoria Pag. 64

 

 

 

Figure 8-9. Plots for Nitrate and Iodine Fine Duplicates TEA 2018-2019

 

   

 

 

Figure 8-10. Plot Cumulative Absolute Difference for Nitrate and Iodine Fine Duplicates TEA 2018- 2019

 

Nitrate Plot

 

 

 

Graph represents the behavior of the accumulated absolute differences of all the samples analyzed by the laboratory. Using as a decision tool what is recommended by MRDI to accept the control analysis process, that in at least 90% of cases (cumulative frequency), the accumulated absolute difference should not exceed 20%.

 

SQM TRS Nueva Victoria Pag. 65

 

 

 

In the laboratory the figure is 93% for nitrate and 88% for iodine, therefore its performance from the point of view of accuracy, is acceptable.

 

c)Hermosa 2019 - 2020

 

Coarse Duplicate:

 

The analysis of the drilling campaign conducted at Hermosa shows that for Nitrate good precision is observed with no apparent bias. Iodine shows low concentrations (ppm), with lower precision, probably due to a nugget type effect, however no bias is observed. (Figure 8-11 and Table 8-7).

 

Table 8-7 Coarse Duplicate for Nitrate and Iodine Hermosa 2019

 

Statisticians   Statisticians
Nitrate % Original Duplicate Difference   Iodine ppm Original Duplicate Difference
Number 559 559     Number 559 559  
Average 6.842 6.848 -0.006   Average 439.9 444.4 -4.54
Median 5.8 6 -0.2   Median 370 380 -10
Variance 17.962 15.569 2.393   Variance 57,900.9 52,344.5 5,556.4
Max 20 20 0   Max 2,000 2,000 0
Min 1.0 1.0 0.0   Min 120 50 70
                 
Test T 1.96       Test T 1.96    
Corr. Coefficient 0.81       Corr. Coefficient 0.76    

 

Figure 8-11. Plot for Nitrate Coarse Duplicate Hermosa 2019

 

   

  

SQM TRS Nueva Victoria Pag. 66

 

 

 

8.1.5Sample Security

 

SQM maintains strict control over sampling, mechanical sample preparation and chemical analysis. In each of the stages, the safety and chain of custody of the samples was safeguarded, using protocols that describe the steps to be followed for this purpose. All these controls are managed and controlled through the Acquire platform, in process of implement by SQM since Q3 2022, according to the follow sections.

 

This section highlights your current processes and procedures and introduces data management processes recommended for deployment in GIM Suite.

 

The following workflow architecture demonstrates the data flow and object requirements of GIM Suite.

 

Planning RC Drilling.

 

Current Situation: The drillings are planned by the geology area using modeling software, which generates an Excel file containing a previous identification of the drilling, which will later be modified for the final identification, along with the east and north coordinates and the planned depth are also indicated. This planning file is delivered to the outsourced company that will drilling the drill in the field. Below is an example of a planning file:

 

 

Solution to executed:

 

The proposed solution includes the following workspace objects:

 

Objects Description
Import Planned Drilling This import task into Arena should allow the user to import the planned drill hole data from the file. Coordinates must be entered in PSAD56. The object must enter the status of the drilling as Planned at the time of import, as well as store the identification of the probing planning in a virtual field. Template file for importing planned drillholes,
See planned drilling Task in "Arena" that will show the information of the planned drillings.

 

SQM TRS Nueva Victoria Pag. 67

 

 

 

8.1.5.1.1Header:

 

Current Situation:

 

In general, a drilling planning can take up to 30 thousand meters of drilling, where between 4 thousand and 5 thousand meters per sector is applied, each drilling equipment in general works for 1 month and a half, the contractor company executes the drilling and monthly delivers to the geology area the file with the information taken in the field, some drilling that was planned may eventually not be executed due to poor conditions of the premises.

 

Each sheet of the Excel file corresponds to a drilling equipment, from this file the data of the following columns are taken.

 

Data Description
Drilling Final identification of Drill
Date Date of execution
Diameter Diameter of Drill
Accounting account Project cost center
Grid Spacing of Drill
Sector Identification of drilled sector
Sample Identification of original field-generated sample
From Start section Sample Original
To Final stretch original sample
Weight Sample mass
Hardness Compaction of the perforated section
Start time Sampling start time
Completion Time Sampling completion time
RPM Revolutions per minute
Pull Down Measure of force exerted by equipment to execute drilling
Sample Original Identification of the parent sample of the duplicate terrain
Sample Check Duplicate land identification

 

The original samples are taken at a depth after the highlight section, thus considering that the samples are not taken at the zero depth of the drilling, the samples usually have sections of 50 cm.

 

In this file they are also indicated in which samples were made the checks of field duplicates, these duplicates are indicated by the company that carried out the drilling, in the protocol the duplicates are made every 5 drilling.

 

The correlative of the samples is controlled by a checkbook used in the field that is delivered by the geology team before starting the drilling campaign, with this if they indicate the identifications of the originals, being that for the identification of the duplicate it is always applied as the last correlative associated with the drilling.

 

SQM TRS Nueva Victoria Pag. 68

 

 

 

 

Example sample book occupied in the field with sample identification.

 

 

Continuing with the collar data, once the drilling is done, the surveying company performs the final coordinates of the drilling, delivering as a result an Excel file with the north, east, elevation data for each drilling executed. The final coordinates cannot have a difference greater than 10% of distance from their planned coordinate.

 

In the file the surveyor indicates that the drilling was not found in the field, indicating that they were eliminated.

 

Example file delivered by surveying company.

 

 

 

SQM TRS Nueva Victoria Pag. 69

 

 

 

Solution to executed:

 

The proposed solution includes the following workspace objects:

 

Object Description
Import Final Drills Object of import in Acquire 4 that allows the user to import the collar data of the final drillings, also considering the import of the original samples and their respective duplicates of terrain. Due to the geology having the same stretch as the geological mapping, it is indicated to occupy the compound of blastholes for the storage of this data.
Data Capture Collar Data Capture of Sand based on Blastholes, which will be used in the field for the capture of collar and sample data, where you must indicate the sounding that the duplicate ground sample can take, the section of the first sample will be entered manually by user, once it must consider the highlight section of the drilling,  The subsequent sections may be indicated automatically by the application, considering as a protocol that the samples original is usually 50 cm in size. The correlative of the samples will continue to be controlled by the checkbooks occupied in land, the user must manually enter the correlative of the first sample taken in the field, the correlative of the subsequent samples will be entered automatically by the application. In this Data Capture, the user can also change the status of the probe as Canceled, thus identifying the drilling that was not executed in the field.
Import Final Coordinates With this importer object of the Acquire 4, the user will enter the final coordinates data of the drillings, the importer will validate if the final coordinates contain a difference in meters greater than 10% in relation to the planned coordinates, indicating a message to the user at the time of data entry.
Consult probing collar Task in "Arena" that will show the information of the necklace of the soundings.
Dashboard Planned vs Executed Meters Dashboard in Sand that presents a graph and grid with information of the planned meters on the perforated meters, thus providing additional information to control the meters of the drilling campaigns. The data can be filtered by date of execution of the drilling and sector of the mine.
Choose Sample Correlates Data Entry object in Acquire 4 that will allow the user to enter a range of correlative samples making it possible to choose which samples will be printed the labels. Occupy METAIMPORTALISES table to manage the data entered for the printing of samples. The Fields will be entered as follows: CATEGORY = TAGS; SUBCATEGORY= GENERATED, PRINTED; SOURCE VALUE = Value of the initial SAMPLE ID; ALIAS VALUE = Value of the final SAMPLE ID. The object must appear with an ERROR message if there are samples generated with some SAMPLE ID within the range indicated by the user. The object must indicate the initial SAMPLE ID to be printed, so that user error is avoided.
Sample Label Report Report in Acquire 4 that allows the user to print sample labels in the format of the checkbook, the report will be applied on an A4 or Letter size paper, considering that the printing will be made on a cardboard paper. The label will have the barcode with the identification of each sample, thus enabling the user to read the barcode with the tablet camera when entering the identification of the first sample

 

SQM TRS Nueva Victoria Pag. 70

 

 

 

8.1.5.1.2Geological mapping

 

Current Situation:

 

The mapping is done offline where the geologist occupies a spreadsheet entering the geological data associated with the data delivered by the drillers, the geology is entered associated with each section of sample generated in the drilling.

 

In the geological mapping, data on lithology, clasts, clays, color, sulfate, salt crust, anhydrite crust, sulfate destace, percentage of clasts and observation are captured.

 

In the same file, geomechanical mapping is also performed, where a code that is related to the intercalations of the rock in the wall of the drilling is captured.

 

 

 

 

 

SQM TRS Nueva Victoria Pag. 71

 

 

 

Solution to executed:

 

The proposed solution includes the following workspace objects:

 

Object Description
Geological Mapping Data capture in "Arena" that allows the user to perform the geological mapping of the drillings, this tool must allow the user to perform the mapping in the field so that it is not connected to the mine network. The task will occupy Blasthole as the task type.
Import Geologic Mapping Importer in "Arena" that allows to enter the geological mapping data carried out in the field.
Geomechanic Mapping Data capture in "Arena" where the geomechanical data of the drilling will be captured. For the data not related to the samples, this data capture must be of the Drillholes type.
Import Geomechanic Mapping Importer in "Arena" that allows to enter the geomechanical mapping data carried out in the field.
Consult Geology of Drilling Task in "Arena" that will show the information of the geology of the drillings.
Consult Geomechanic of Drilling Task in "Arena" that will show the information of the geomechanics of the drillings.

 

8.1.5.1.3Dispatch of samples for mechanical preparation

 

Current Situation:

 

Once the mapping and sampling is finished, the samples are sent to mechanical preparation, the detail of these samples is in a document that is sent to the pilot plant.

 

 

At the time of receipt of the samples in the pilot plant, the responsible person enters in an Excel file the identifications of each of the samples, in this file that manages the sequence of the samples and indicates the position in which the duplicates will be taken, the file considers that every 20 samples a duplicate of pulp is generated.

 

SQM TRS Nueva Victoria Pag. 72

 

 

 

Pulp duplicates have their own sample identification that is distinct from samples delivered by geology, by convention the nomenclature of the pulp sample carries a correlative as a prefix then a hyphen followed by the correlative of the original sample. The chemical results of the sample generated in the pilot plant are returned from the chemical laboratory, then these results are stored in the geology database.

 

 

Solution to executed:

 

The proposed solution includes the following workspace objects:

 

Object Description
Create dispatch order for Physical Sample Preparation In this object the user can generate the order of dispatch of samples for physical preparation. Create a correlative and identifier for the office number. Example for identification. F2022-0001 where,  F = Physical dispatch prefix, 2022 = Year of Shipment, 0001 = Correlative controller per year.
Print dispatch order for Physical Sample Preparation Object that will allow to execute the printing of the report of shipment order to physical preparation.
Physical Office Reception Script object in Acquire that allows the user to indicate the samples received in the pilot plant, the object must be filtered by physical dispatch number where it will make available the samples associated with this dispatch, thus enabling the user to select the samples and indicate in the system that these samples were received. The object must indicate and automatically create the pulp samples indicating the position where each one was generated.
Consult Drilling Dispatch to Preparation Task in Sand that will show the information of the dispatch of the samples of the drilling that were sent to mechanical preparation.
Consult Pulp Samples Task in Arena that will have the information of the pulp samples in a grid of data associated with the number of the physical dispatch received by the pilot plant

 

In the drilling stage, before drilling begins, the drill rod was marked to indicate the distance for sampling. The drilling rig was equipped with a cyclone to slow down the particle velocity, under it, a bag is placed to collect the samples.

 

The collected sample from the cyclone is carefully stored in a plastic bag, then it was identified with a sequential card with a barcode and tied. The Supervisor oversaw requesting a revision to a determined sample of the drilling (coarse sample), originating another sample and of noting the weights obtained in the balance for each cut sample. This data collection is done through the Acquire platform.

 

SQM TRS Nueva Victoria Pag. 73

 

 

 

The samples were loaded daily onto the truck that will transport them to the sample plant, the following steps are followed:

 

SQM Supervisor delivers a dispatch guide with the drill holes and the total number of samples to be collected and mentions to the person in charge of the sample plant, the number of samples and the number of samples without recovery, if any. This dispatch guide is generated for Acquire platform.

 

Samples are loaded sequentially according to the drilling and unloaded in the same way.

 

Upon arrival at the plant, the corresponding permit must be requested from the area manager, who will provide an unloading guideline, which contemplates how the samples should be positioned on the pallets.

 

The pallets with samples are moved to the sample preparation area from their storage place to the place where the Cone Splitter is located.

 

During all stages of sample preparation, special care was taken to maintain the identification of the samples and to clean the equipment after use. The samples already packed and labeled were collected following the instructions for filling boxes of “caliche” samples, respecting the correlative order of the samples, the order in which they must be deposited in the box and the quantity of samples according to the capacity of the box.

 

The trays were labeled indicating the corresponding information and date (Figure 8-11) are then transferred to the storage place at Testigoteca (core Warehouse) Iris and Testigoteca TEA located at Nueva Victoria (Figure 8-12), either transitory or final, after being sent to the laboratory.

 

Figure 8-12. A) Samples Storage B) Drill Hole and Samples Labeling

 

 

 

SQM TRS Nueva Victoria Pag. 74

 

 

 

Figure 8-13. Iris – TEA Warehouse at Nueva Victoria

 

 

Assay samples were collected by appropriately qualified staff at the laboratories. The analysis results of the samples were reported by the specialty analyst to the LIMS software system, integrated to platform Acquire.

 

Automatically LIMS triggering an e-mail to the users and only to those who are authorized to send the information.

 

Opinion of Adequacy

 

The competent person considers that in what corresponds to the preparation, analysis, safety of the samples and procedures used by SQM in Nueva Victoria complies with the appropriate standard without showing relevant deficiencies that may alter the obtaining of the results derived from the procedures.

 

SQM TRS Nueva Victoria Pag. 75

 

 

 

9Data Verification

 

Procedures

 

Verification by the QP focuses on drilling, sample collection, handling and quality control procedures, geological mapping of drill cores and cuttings, and analytical and quality assurance laboratory procedures. Based on the review of SQM's procedures and standards, the protocols are considered adequate to guarantee the quality of the data obtained from the drilling campaigns and laboratory analysis.

 

Data Management

 

Using the drillings, the recognition of the deposit is carried out in depth and to this is used prospecting grids 400 x 400 m, 200 x 200 m, 100 x 100 m, 100T and 50 x 50 m. Depend on the size of drillhole grid, the Resources are estimated by different interpolations methods (for details see 1.3 Mineral Resources Statement).

 

The samples obtained from these reverse air drilling campaigns are sent to the internal laboratory of SQM who have quality control standards regarding its mechanical and chemical treatment. QA-QC analyzes are performed on control samples in all prospecting grid à (400 x 400 m, 200 x 200 m, 100 x 100; 100T and 50 x 50m). This QA-QC consists of the analysis of NaNO3 and Iodine concentrations in duplicate vs. original (or primary) samples.

 

Technical procedures

 

The competent person indicates that in terms of the Chain of Custody (traceability of the place of origin of the samples), subsequent preparation and analysis and security of the samples, SQM applies procedures that ensure optimal obtaining of field and laboratory data; to ensure control and quality of results.

 

Quality Control Procedures

 

The competent person indicates that in SQM Quality Control ensures the monitoring of samples accurately from the preparation of the sample and the consequent chemical analysis through a protocol that includes regular analysis of duplicates and insertion of samples for quality control.

 

Precision Evaluation

 

Regarding the Accuracy Assessment, the Competent Person indicates that the iodine and nitrate grades of the duplicate samples in the 400 x 400, 200 x 200, and 100 x 100 meshes have good correlation with the grades of the original samples; However, it is recommended to always maintain permanent control. In this process, to prevent and detect in time any anomaly that could happen.

 

SQM TRS Nueva Victoria Pag. 76

 

 

 

Accuracy Evaluation

 

A QA-QC analysis of the campaign is carried out in the Nueva Victoria Sectors for standard/pattern samples, which were carried out and analyzed by the laboratory, the results obtained show that the variation of the analyzes with respect to the standards used by SQM show acceptable margins, with a maximum of ± 0.53% of NaNO3 and 60 ppm of Iodine (Informe 20 F, 2021).

 

Qualified Person’s Opinion of Data Adequacy

 

The Competent Person indicates that the methodologies used by SQM to estimate geological resources and reserves in New Victoria are adequate.

 

The 400 x 400 m drilling grid may imply continuity, average grade of mineralization with a moderate confidence level since there is no certainty that all or part of these resources will become mineral reserves after the application of the modifying factors.

 

The 200 x 200 m and 100 x 100 drilling grids generate geological information of greater detail being possible to define geological units, continuity, grades, and power. Therefore, at this stage of exploration, sectors for geometallurgical tests can be defined.

 

Therefore, at this stage of exploration, sectors for geometallurgical tests can be defined. To the extent that the exploration grid is sequentially reduced with drilling 100T and 50 x 50 m, the geological information is more robust, solid which allows a characterization of the mineral deposit with a significant level of confidence. They are called Measured Resources.

 

SQM TRS Nueva Victoria Pag. 77

 

 

 

10Mineral Processing and Metallurgical Testing

 

Since 2009, further research has been developed through laboratory tests to continuously improve yield estimation and valuable element recovery such as iodine and nitrate. These efforts, focused on caliche chemical and physical characterization, made it possible to develop a set of strategies that provide a better prediction and recovery projection for each caliche mining area identified, which are and will be processed at Nueva Victoria's plant.

 

It should be noted that, before Nueva Victoria started operations in 2002, SQM nitrates & iodine explored options to expand and/or optimize iodine production through a trial plan developed at Pedro de Valdivia's process plant to establish an oxidative treatment of the concentrate. These tests demonstrated that it is possible to avoid flotation stage in the conventional process, iodine production process works well using an external oxidizer, and it is economically viable and less costly to build and operate. As such, extensive tests were completed with different iodine brines from different resources to confirm these results, as well as considering the oxidation stages applicable at Nueva Victoria Process Plant.

 

In 2016, given water scarcity in the north of Chile, industry investigated new sustainable sources of water for its processes. A caliche leaching test plan was performed with seawater, to determine its technical feasibility, positive and negative impacts or metallurgical recovery and performance equivalence. A pilot plant at the plant site demonstrated its feasibility of the leaching process. The historical development of testing has made it possible to differentiate the main categories of caliche types according to their composition and physical behavior. These tests are designed to optimize the process to guarantee compliance with the customer's product specifications and, on the other hand, to ensure that harmful elements can be kept below the established limits.

 

More than a decade of research on multiple systems has provided a foundation for leaching process, recovery, and production of iodine. This includes a review of trials which have contributed to the development and build-up of current operating procedures.

 

Historical development of metallurgical tests

 

In 2009, heap & ponds management created a working group that will be in charge to develop tests to continuously improve yield estimation and valuable elements recovery, such as iodine and nitrate, from heaps and evaporation ponds. In early February 2010, the first metallurgical test work program was presented at the Pilot Plant facility located at Iris sector. Its main objective is to provide, through pilot scale tests, all the necessary data to guide, simulate, strengthen, and generate enough knowledge to understand the phenomenology behind production processes in leaching heaps and evaporation ponds.

 

SQM TRS Nueva Victoria Pag. 78

 

 

 

The initial work program was framed around the following topics:

 

Reviewing constructive aspects of heaps.

 

Study thermodynamic, kinetic, and hydraulic phenomena of the heap.

 

Designing a configuration in terms of performance and production level.

 

Work program activities are divided into specializations and the objectives of each activity and methodology followed are summarized in the following table.

 

Table 10-1. Methodologies of the Test Plan Initially Developed for the Study of Caliche Behavior.

 

Activity Objective Methodology
Heap physical aspects Pile geometry and height Optimum dimensions and the effect of height on performance Mathematical methods and column leaching tests at different heights
Granulometry Impact of size and determination of maximum optimum Leaching tests at three levels of granulometry
Loading Impact of loading shape and optimization of the operation Column percolability with different size segregation in loading
Wetting requirements Determination of impact on yield due to wetting effect Column tests, dry and wet ore
Caliche characterization Characterization by mining sector Chemical analysis, XRD and treatability tests
Hydraulics Impregnation rate, irrigation and irrigation system configuration Establish optimums Mathematical methods and industrial level tests
Kinetics Species solubilities Establish concentrations of interferents in iodine and nitrate leaching Successive leaching tests
Effect of irrigation configuration Effect of type of lixiviant Column tests
Sequestering phases Impact of clays on leaching Stirred reactor tests
System configuration Pile reworking study Evaluate impact on yield Column tests
Solar evaporation ponds AFN / brine mixture study Reduction of salt harvesting times Stirred and tray reactor tests
Routine Sample processing Preparation and segregation of test samples  
Treatability tests Data on the behavior of caliche available in heaps according to the exploited sector Column tests
Quality control of irrigation elements and flowmeters Review of irrigation assurance control on a homogeneous basis  

 

 

This first metallurgical test work plan results in the establishment of appropriate heap dimensions, maximum ROM size and heap irrigation configuration. In addition to giving way to studies of caliche solubilities and their behavior towards leaching. Diagram of chemical, physical, mineralogical, and metallurgical characterization tests applied to all company resources.

 

SQM, through its Research and Development area, has carried out the following tests at plant and/or pilot scale that have allowed improving the recovery process and product quality:

 

SQM TRS Nueva Victoria Pag. 79

 

 

 

Iodide solution cleaning tests.

 

Iodide oxidation tests with Hydrogen and/or Chlorine in the Iodine Plant.

 

The cleaning test made it possible to establish two stages prior to the oxidation of solution filtration with an adjuvant and with activated carbon. In addition, it is defined that to intensify the cleaning work of this stage, it is necessary to add traces of sulfur dioxide to the iodide solution. Meanwhile, the iodide oxidation tests allowed incorporating the use of hydrogen peroxide and/or chlorine in adequate proportions to dispense with the iodine concentration stage by flotation, obtaining a pulp with a high content of iodine crystals.

 

Currently, the metallurgical tests performed are related to the physicochemical properties of the material and the behavior during leaching. The procedures associated with these tests are described below.

 

Metallurgical Testing

 

The main objective of the tests developed is to be assessing different minerals' response to leaching. In the pilot plant-laboratory, test data collection for the characterization and recovery database of composites are generated. Tests detailed below have the following specific objectives:

 

Determine whether analyzed material is sufficiently amenable to concentration production by established separation and recovery methods in plant.

 

Optimize this process to guarantee a recovery that will be linked intrinsically to mineralogical and chemical characterization, as well as physical and granulometric characterization of mineral to be treated.

 

Determine deleterious elements, to establish mechanisms for operations to keep them below certain limits that guarantee a certain product quality.

  

SQM's analytical and pilot test laboratories perform the following chemical, mineralogical, and metallurgical tests:

 

Microscopy and chemical composition.

 

Physical properties: Tail Test, Borra test, Laboratory granulometry, Embedding tests, Permeability.

 

Leaching test.

 

Currently, SQM is conducting plant-scale tests to optimize heap leach operations through categorization of the mineral to be leached. Metallurgical studies are conducted on mining method called continuous mining (CM), which consists of breaking and extracting the “caliche mantle” material through a tractor with a cutting drum, which allows obtaining a smaller mineral with more homogeneous size distribution.

 

Preliminary leaching tests of this material under identical conditions to ROM material have resulted in higher recoveries of approximately 12% of the recovery in ROM heaps.

 

SQM TRS Nueva Victoria Pag. 80

 

 

 

In order develop these tests, two different CM teams have been acquired and evaluated:

 

Rolling system availability.

 

Cutting system design.

 

Sensitivity to rock conditions.

 

Productivity variability.

 

Consumption and replacement of components.

 

The 2023 mining plan aims to treat 29% of mineral caliche by CM to obtain, through quarry selection, a maximum recovery estimated at +12% in iodine and +6% in nitrate. At the operational level, recoveries will be monitored to establish annual sequential exploitation levels. Through this work it is hoped to determine an optimal proportion of CM mineral to be incorporated into ROM stockpiles to increase recovery.

 

In the following sections, a description of sample preparation and characterization procedures, for metallurgical tests, and process and product monitoring/control activities of the operations through chemical analysis is given.

 

10.1.1Sample preparation

 

Samples for metallurgical testing are obtained through a sampling campaign. The methods used are related to the different drilling methodologies used in the different campaigns to obtain core samples for analysis through a 100T-200 grid drilling campaign and diamond drilling (more details in section 7.3 Drilling Methods and Results). With the material sorted from the trial pits (calicatas), loading faces, piles, drill holes and diamond drill, composite samples are prepared to determine iodine and nitrate grades, and to determine physicochemical properties of the material to predict its behavior during leaching.

 

Samples are segregated according to a mechanical preparation guide, which aims to provide an effective guideline for minimum required mass and characteristic sizes for each test, to optimize the use of available material. This allows successful metallurgical testing, ensuring validity of results and reproducibility. The method of sampling and development of metallurgical tests on samples from Nueva Victoria property, for the projection of future mineral resources, consists in summary of the stages outlined in the Figure 10.1

 

SQM TRS Nueva Victoria Pag. 81

 

 

 

Figure 10-1. General Stages of the Sampling Methodology and Development of Metallurgical Test at Nueva Victoria.

 

 

As for the development of metallurgical, characterization, leaching and physical properties tests, these are developed by teams of specialized professionals with extensive experience in the mining-geo-metallurgical field. The work program in metallurgical tests contemplates that the samples are sent to internal laboratories to perform the analysis and test work according to the following detail:

 

Analysis Laboratories located in Antofagasta provide chemical and mineralogical analysis.

 

Pilot Plant Laboratory, located in Iris- Nueva Victoria, for completion of the physical and leaching response tests.

 

Details of the names, locations and responsibilities of each laboratory involved in the development of the metallurgical tests are reported in section 10.4 Analytical and Testing Laboratories. The reports documenting the drilling programs provide detailed descriptions of sampling and sample preparation methodologies, analytical procedures meeting current industry standards. Quality control is implemented at all stages to ensure and verify that the collection process occurs at each stage successfully and is representative. To establish the representativeness of the samples, a map of a diamond drilling campaign in the NV sector is shown below to estimate the physical and chemical properties of the caliche of the resource to be exploited (Figure 10-2).

 

SQM TRS Nueva Victoria Pag. 82

 

 

 

Figure 10-2. Diamond Drilling Campaign Map for Composite Samples from the NV Sector for Metallurgical Testing

 

 

 

SQM TRS Nueva Victoria Pag. 83

 

 

 

10.1.2Caliche Mineralogical and Chemical Characterization

   

As part of SQM nitrate test work, mineralogical tests were conducted on composite samples. To develop its mineralogical characteristics and its alterations, a study of the elemental composition is conducted by X-Ray Diffraction (XRD). A particle mineral analysis (PMA) to determine mineral content of the sample is carried out.

 

Caliche mineralogical characterization are done for the components Nitrate, Chloride Iodate, Sulfate and Silicate.

 

Additionally, caliche chemical characterization in iodine, nitrate and Na2SO4 (%), Ca (%), K (%), Mg (%), KClO4 (%), NaCl (%), Na (%), Na (%), H3BO3 (%), and SO4 were obtained from chemical analyses obtained from an internal laboratory of the company. The analysis methods are shown in Table 10-2. More details on SQM's in-house and staff-operated laboratories can be found in the section 10.4 Analytical and Testing Laboratories.

 

The protocols used for each of the methods are properly documented with respect to materials, equipment, procedures, and control measures. Details of the procedure used to calculate iodine and nitrate grades are provided in Section 10.2.3

 

Table 10-2. Applied Methods for the Characterization of Caliche or Composite.

 

Parameter Unit Method
Iodine grade ppm Volumetric redox
Nitrate grade % UV-Vis
Na2SO4 % Gravimetric / ICP
Ca % Potentiometric / Direct Aspiration – AA or ICP Finish
Mg % Potentiometric / Direct Aspiration – AA or ICP Finish
K % Direct Aspiration – AA or ICP Finish
SO4 % Gravimetric / ICP
KclO4 % Potentiometric / Direct Aspiration – AA or ICP Finish
NaCl % Volumetric
Na % Direct Aspiration – AA or ICP Finish
H3BO3 % Volumetric or ICP Finish

 

In-house analytical laboratories operated by company personnel are responsible for the chemical and mineralogical analysis of samples. These laboratories are located in the city of Antofagasta and correspond to the following four sub-facilities:

 

Caliche-Iodine Laboratory

 

Research and Development Laboratory

 

Quality Control Laboratory

 

SEM and XRD Laboratory

 

Results of the chemical and mineralogical characterization reported by the company are conclusive on the following points:

 

SQM TRS Nueva Victoria Pag. 84

 

 

  

The most soluble part of the saline matrix is composed of sulfates, nitrates and chlorides.

 

There are differences in the ion compositions present in salt matrix (SM).

 

Anhydrite, Polyhalita and Glauberite, and less soluble minerals, have calcium sulfate associations.

 

From a chemical-salt point of view, this deposit is favorable in terms of the extraction process, as it contains an average of 49% of soluble salts, high calcium content (>2.5%), and good concentrations of chlorides and sulfates (about 11% and 13% respectively).

 

Being a mostly semi-soft deposit CM methods can be applied in almost all the deposit. The geomechanical characteristic of the deposit together with a low clastic content and low abrasiveness (proven by calicatas) allows low mining costs applying CM technology.

 

10.1.3Caliche Nitrate and Iodine Grade Determination

 

Composite samples (material sorted from the trial pits (calicatas), loading faces, piles, drill holes and diamond piles) are analyzed by iodine and nitrate grades. The analyses are conducted by Caliche and Iodine laboratory located in the city of Antofagasta. Facilities for iodine and nitrate analysis have qualified under ISO- 9001:2015 for which TÜV Rheinland provides quality management system certification. The latest recertification process was approved in November 2020 and is valid until March 15, 2023.

 

10.1.3.1Iodine determination

 

There are two methods to determine iodine in caliche, redox volumetry and XRF. Redox volumetry is based on titration of an exactly known concentration solution, called standard solution, which is gradually added to another solution of unknown concentration, until chemical reaction between both solutions is complete (equivalence point). Iodine determination by XRF uses XRF Spectro ASOMA equipment, in which a pressed mineral sample is placed in a reading cell. This year it was possible to replace the team with the Rigaku NEX QC, which allows to analyze six samples, A silicon drift detector (SDD) affords extremely high-count rate capability with excellent spectral resolution. This enables NEX QC+ to deliver the highest precision analytical results in the shortest possible measurement times. QA controls consist of equipment status checks, sample reagent blanks, titrant concentration checks, repeat analysis for a standard with sample set to confirm its value.

 

Figure 10.3. Rigaku NEX QC series of EDXRF Spectrometers

 

 

 

SQM TRS Nueva Victoria Pag. 85

 

 

 

 

10.1.3.2Nitrate determination

  

Nitrate grade in caliches is determined by UV-visible molecular absorption spectroscopy. This technique allows to quantify parameters in solution, based on their absorption at a certain wavelength of the UV-visible spectrum (between 100 and 800 nm).

 

This determination uses a Molecular Absorption Spectrophotometer POE-011-01, or POE-17-01, in which a glass test tube containing a filtered solution obtained by leaching with filtered distilled water is used. Results obtained are expressed in percent nitrate.

 

QA criteria and result validity are achieved through:

 

Prior equipment verification.

 

Performing comparative nitrate analysis once a shift, by contrasting readings of the same samples with other UV-visible equipment and checking readings in Kjeldahl method distillation equipment, for nitrogen determination.

 

Conducting standard and QC sample input every 10 samples.

 

Although the certification is specific to iodine and nitrate grade determination, this laboratory is specialized in chemical and mineralogical analysis of mineral resources, with long-standing experience in this field. It is the QP’s opinion that quality control and analytical procedures used at the Antofagasta Caliches and Iodine laboratory are of high quality.

 

Figure 10.3. UDK 169 with AutoKjel Autosampler - Automatic Kjeldahl Nitrogen Protein Analyzer

 

 

SQM TRS Nueva Victoria Pag. 86

 

 

 

10.1.4Caliche Physical Properties

 

To measure, identify, and describe mineral physical tests of mineral properties are developed to predict how it will react under certain treatment conditions. The tests performed are summarized in Table 10-3. During the site visit it was possible to verify the development of embedding, sedimentation, and compaction tests in the Iris Pilot Plant Laboratory, which are shown in Figure 10-3.

 

Table 10-3. Determination of Physical Properties of Caliche Minerals.

 

Test Parameter Procedure Objective Impact
Tails Test Sedimentation and compaction Sedimentation test, measuring the clearance and riprap cake every hour for a period of about 12 hours Obtain the rate of sedimentation and compaction of fines Evidence of crown instability and mid generation. Irrigation rate
Borra test % Of fine material The retained material is measured between the -#35 #+100 and #-100 after a flocculation and decantation process. Flocculation and decantation of ore To obtain the amount of ore flocculation and decantation process % Of fine that could delay irrigation. Irrigation rate. Canalizations.
Size distribution % Of microfine Standard test of granulometry, the percentage under 200 mesh is given Obtain % microfine % Water retention and yield losses
Permeability K (cm/h) Using constant load permeameter and Darcy's law To measure the degree of permeability of ore Decrease in extraction kinetics of extraction
Embedded alpha Wettability measurement procedure of rock To measure the degree of wettability of the ore Variability in impregnation times

 

SQM TRS Nueva Victoria Pag. 87

 

  

 

Figure 10-5. Embedding, Compaction and Sedimentation Tests Performed in the Iris Pilot Plant Laboratory.

 

 

Table 10-4 provides a summary of physical test results comparing the conditions of TEA and another project.

 

Table 10-4 Comparative Results of Physical Tests for Pampa Orcoma and TEA Exploitation Project.

 

Sector Sedimentation Compactation % Fines #-200 Alpha
TEA 0.024 7.54 31.86 10.57 2.37
ORCOMA 0.025 10.05 32.98 12.29 2.29

 

According to the results, it is possible to highlight the following points:

 

Sedimentation: Both have medium sedimentation velocity, which implies the need for impregnation and prolonged resting for stabilization.

 

Compaction: Orcoma has a good compaction, which indicates a greater uniformity in the porous bed, which allows reaching high irrigation rates and therefore better kinetics.

 

Fines: Both sectors present high percentage of fines, this implies that the best impregnant to use should be a solution other than water. The negative impact of this condition could be increased depending on the type of fine material (e.g., clays) generating water pockets and channeling.

 

Material #-200: Corresponds to the microfine and are the ones that give rise to channeling and exhibit very high value in both sectors.

 

Parameter Alpha: At medium levels, these imply acceptable embedding speed which can be improved with a slow controlled impregnation.

 

SQM TRS Nueva Victoria Pag. 88

 

 

 

As the physical properties measured are directly related to the irrigation strategy, the conclusion is that both caliches should be treated in a similar way considering a standard impregnation stage of mixed drip and sprinkler irrigation.

 

10.1.5Agitated Leaching Tests

 

Leaching tests are performed at the company's in-house laboratory facilities located at the Iris Pilot Plant. The following is a brief description of the agitated and successive leaching test procedure.

 

10.1.5.1Leaching in Stirred Reactors

 

Leaching experiments are conducted at atmospheric pressure and temperature in a glass reactor without baffles. A propeller agitator at 400 RPM was used to agitate leach suspension. In short, all the experiments were executed with:

 

Ambient conditions.

 

Caliche sample particle size 100% mesh -65# mesh.

 

Caliche mass 500 g.

 

L/S ratio 2:1.

 

Leaching time 2 h.

 

Three contact leaching including use of drainage solution.

 

To start up the leaching experiment, a reactor was initially filled with distilled water and then the solution is gently agitated. After a few minutes, PH and ORP values were set, caliche concentrate added to the solution and agitation increased to the final rate.

 

Once finished, the product was filtered, and the brine solution analyzed by checking the extraction of analytes and minerals by contact with the leaching agent, consumption per unit and iodine extraction response.

 

Successive leaching’s are complementary to stirred vessel leaching and performed in a stirred vessel with the same parameters explained above. However, it contemplates leaching three caliche samples successively with the resulting drainage solution of each stage. The objective of this test is to enrich this solution of an element of interest such as iodine and nitrates to evaluate heap performance as this solution percolates through the heap. The representative scheme of successive leaching in stirred vessel reactors is shown in Figure 10-6.

 

SQM TRS Nueva Victoria Pag. 89

 

 

 

Figure 10-6. Successive Leach Test Development Procedure

 

 

The extraction of each analyte and minerals per contact is analyzed. These results reported by the company are conclusive on the following points:

 

Higher quantity of soluble salts, lower is the extraction.

 

Higher proportion of Calcium in Salt Matrix results in higher extraction.

 

Physical and chemical quality for Leaching is determined by a Soluble Salts content of less than 50%.

 

For a caliche of TEA sector, the chemical characterization and leaching results show in Table 10-5, where an average salt matrix of 63.7% soluble salts and iodine yield of 56.4%.

 

Table 10-5 Chemical Characterization of Samples Obtained from TEA and Successive Leach Test Results.

 

Sectors Mesh Recoveries Proyected Elements
Mton Iodine (ppm) NaNO3 Na2SO4 Ca Mg k SO4 ap KCIO4 NaCl Na H3BO3
Hermosa 100-100T 155 408 6.7 17.3 1.82 0.95 0.84 10.84 0.04 12.6 8.13 0.23
TEA Norte 100T 62 428 5.8 18.4 2.21 1 0.85 10.6 0.08 14.5 9.45 0.4
TEA Sur 200 22 412 4.7 21 3.02 1.1 0.81 10.57 0.02 14.2 7.97 0.39
TEA Oeste 2000 75 407 5.4 16.6 2.31 0.97 0.69 8.44 0.05 16.7 8.87 0.57
Average   314 412 6.1 17.6 2.1 0.97 0.8 10.2 0.05 14.1 8.56 0.36

 

The following graphs, included in Figure 10-7, show the results of the agitated leaching tests of two resources from TEA and Pampa Orcoma. The graphs represent the Nitrate and Iodine yield achieved as a function of soluble salt content.

 

SQM TRS Nueva Victoria Pag. 90

 

 

 

In the graphs, the green line corresponds to the experimental yield result, while the orange line indicates a modeling result of the Pampa Orcoma yield factored at 90%. The yield equivalent to 90% of what the model indicates is 66.3% for Iodine and 63.4% for Nitrate. These factored yields are conservatively used for the economic evaluation of the project.

 

The green line, which corresponds to the experimental results, shows that an ore from Pampa Orcoma with a content of soluble salts of 46.5% has a yield of 73% in iodine and 70.5% in nitrate, while an ore from TEA, with a content of 62.9% of soluble salts, has a yield of 55.5% in iodine and 60.7% in nitrate. Both resources show a difference in Nitrate yield of 70.5% vs 60.7% and Iodine yield, 73% vs 55.5%. Nitrate and iodine yield difference is the 9% and 17%, respectively.

 

Figure 10-7. Nitrate and Iodine yield Obtained by Successive Agitated Leaching Test.

 

 

 

 

SQM TRS Nueva Victoria Pag. 91

 

 

 

10.1.6Column Leach Test Using Sea Water

 

Water availability is limited, being a critical issue for the mining industries and, therefore, other leaching agents such as seawater can be a viable alternative. Therefore, experimental studies of caliche leaching in mini columns were conducted to evaluate seawater's effect.

 

This study aims to analyze seawater's effect on caliche leaching from different sectors of nitrate-iodine mining properties, using seawater sampled in Mejillones Bay at 100 m offshore and below 15 m deep.

 

The types of tests executed are in duplicate under the following impregnation-irrigation strategy and conditions:

 

Water Impregnation - Irrigation with Water (MC 1-MC2).

 

Water Impregnation - Irrigation with 60% v/v Water - 40% v/v with a recirculated weakly acidic water ( AFA). (MC 3-MC 4).

 

Seawater Impregnation - Irrigation with Seawater (MC 5-MC 6).

 

Seawater Impregnation - Irrigation with Mixed 60% v/v Seawater - 40% v/v AFA (MC 7-MC 8)

 

The test development conditions are indicated in Table 10-6.

 

Composition determined by granulometry of the material disposed in the columns.

 

Table 10-6 Conditions for Leaching Experiments with Seawater.

 

Parameter Detaille
Mass 3,031.3 g
Granulometry 1'' - 3/4'' - 1/2'' - 1/4'' - 20'' mesh
Test Duration 7 days
Total Impregnation 19 hours in watering/rest schedule
Continuous Irrigation 1 h/2 h-1 h/1 h/1h h-2 h/1 h
Irrigation Rate Flow-Flow 5 days and 20 h

 

The results of the experiments show that highly soluble minerals such as nitrate and iodate are rapidly leached with seawater without much difference with respect to the raw water method.

 

Regarding nitrate and iodine extraction, a higher NO3 extraction, in Figure 10-8, is observed when leaching with seawater as well as a higher IO3 extraction is observed when leaching with seawater (MC5 and MC6 curves versus MC1 and MC2 curves).

 

In addition to the above, when comparing the extractions achieved in iodine leaching by water/AFA and seawater/AFA, curves MC 3, and MC 4 versus MC 7 and MC 8, the seawater/AFA mixture is better (MC 7 and MC 8). While, for nitrate, there is no appreciable difference in increase when using seawater as a mixture and extraction is like that of iodine.

 

SQM TRS Nueva Victoria Pag. 92

 

 

 

Figure 10-8. Results of Nitrate and Iodine Extraction by Seawater Leaching.

 

 

a)            Nitrate extraction with seawater

 

 

b)            Iodine extraction with seawater

 

In the future heap behavior will be studies through column leaching tests using seawater, including different irrigation rates and bed heights in the column, and analyzing the experimental concentrations of each species.

 

SQM TRS Nueva Victoria Pag. 93

 

 

 

10.1.7Laboratory Control Procedures

 

Currently, there is a quality control system in place to monitor iodine production operations, which consists of monitoring processes starting with inlet brine characterization, followed by sampling and characterization of the cutting and oxidation brine, as well as the prill product obtained. From the product obtained from the iodine prill plant, a series of analyses are conducted to quantify purity, chloride/bromine ratio, sulfate, mercury, residues, and color index.

 

The analyses, on liquid and solid samples, are performed in the laboratory facilities located in the city of Antofagasta, Analysis laboratory, involving two installations:

 

Caliche-Iodine Laboratory: Determination of iodine and nitrate in caliches.

 

Research and Development Laboratory: Facility in charge of performing determination by AAS, ICP-OES, potentiometry, conventional titration, solution density.

 

More details on SQM's in-house and staff-operated laboratories can be found in the section 10.4 Analytical and Testing Laboratories.

 

Table 10-7 shows the basic set of analyses requested from laboratories and the methodologies used for their determination.

 

Table 10-7 List of Requested Analyses for Caliche Leach Brines and Iodine Prill

 

Iodine Solutions
Parameter Method
Iodine grade Volumetric redox
Nitrate grade UV-Vis
pH Potentiometric
Acidity Volumetric acid-base
Alkalinity Volumetric acid-base
H3BO3 Volumetric or ICP Finish
Na2SO4 Gravimetric / ICP
Ca Potentiometric / Direct Aspiration-AA or ICP Finish
Mg Potentiometric / Direct Aspiration-AA or ICP Finish
K Direct Aspiration-AA or ICP Finish
SO4 Gravimetric / ICP
KClO4 Potentiometric
NaCl Volumetric
Na Direct Aspiration-AA or ICP Finish

 

SQM TRS Nueva Victoria Pag. 94

 

 

 

Iodine Prill
Parameter Method
Purity or iodine count Potentiometric
Bromide and chloride Volumetric
Non-volatile material (residue) Gravimetric
Sulfate Turbidimetry
Mercury Spectrophotometry
Coloration Index Colorimetric

 

SQM's nitrate and iodine processing plants have been in production for many years and metallurgical requirements for processing and recovering the nitrate from evaporation ponds from iodine process remaining solution are well known. Consequently, no new metallurgical studies related to evaporation studies have recently been carried out. However, once pond systems are in operation, sampling and assay procedures for evaporation tests are as follows:

 

Brine sample collection is conducted on a periodic basis to measure brine properties, such as chemical analysis, density, brine activity, etc. Samples are taken by an internal company laboratory using the same methods and quality control procedures as those applied to other brine samples.

 

Precipitated salts are collected from ponds for chemical analysis to evaluate evaporation pathways, brine evolution, and physical and chemical properties of the salts.

 

Samples Representativeness

 

The company has established Quality Assurance/Quality Control (QA/QC) measures to ensure the reliability and accuracy of sampling, preparation, and assays, as well as the results obtained from assays. These measures include field procedures and checks that cover aspects such as monitoring to detect and correct any errors during drilling, prospecting, sampling, and assaying, as well as data management and database integrity. This is done to ensure that the data generated are reliable and can be used in both resource estimation and prediction of recovery estimates.

 

According to the sampling protocol, the samples, once logged by the technical staff in charge of the campaign, are delivered from the drilling site to a secure and private facility. Analytical samples are prepared and assayed at the in-house " Pilot Plant Laboratory" located at the Nueva Victoria site and Iris sector. The protocol ensures the correct entry in the database by tracking the samples from their sampling or collection points, identifying them with an ID, and recording what has been done for the samples delivered/received. The set of procedures and instructions for traceability corresponds to a document called "Caliche AR Sample Preparation Procedure".

 

The company applies a quality control protocol established in the laboratory to receive caliche samples from all the areas developed according to the campaign, preparing the dispatches together with the documentation for sending the samples, preparing, and inserting the quality controls, which will be the verification of the precision and accuracy of the results. The LIMS data management system is used to randomly order the standards and duplicates in the corresponding request. By chemical species analysis, an insertion rate of standard or standard QA/QC samples and duplicates is established.

 

SQM TRS Nueva Victoria Pag. 95

 

 

 

The following criteria are established for the handling of results:

 

Numbers of samples that are above and below the lower detection limits.

 

Differences of values in duplicates are evaluated. For example, when comparing duplicates of nitrate and iodine grades, a maximum difference, calculated in absolute value, of 0.4% for NaNO3 and 0.014% for iodine is accepted.

 

For standards measured, results with a tolerance of +/- 2 standard deviations from the certified value are accepted.

 

In the case of any deviation, the laboratory manager reviews and requests check of the samples, in case the duplicate or standard is non-compliant.

 

As for physical characterization and leaching tests, all tests are developed in duplicate. Determination results are accepted with a difference of values in the duplicates of 2%.

 

Given the QA/QC controls and documentation described above the QP considers that the test samples are representative of the different types and styles of mineralization and of the mineral deposit. Sampling for operations control is representative of caliche as they are obtained directly from the areas being mined or scheduled for mining. The caliche analysis and characterization tests are appropriate for a good planning of operations based on a recovery estimation.

 

Analytical and Testing Laboratories

 

The metallurgical testing program directs samples to be sent to internal laboratories in charge of analysis and testing:

 

Analysis laboratory located in Antofagasta, in charge of chemical and mineralogical analysis and composed of four laboratories (see Table 10-8).

 

Pilot Plant Laboratory located at Iris- Nueva Victoria responsible for sample reception and physical and leaching response tests.

 

The following table details the available facilities and the analyses performed in each one of them.

 

Table 10-8 List of Installations Available for Analysis.

 

Laboratory Location Analyses
Caliche-Iodine Laboratory Antofagasta Determination of Iodine and Nitrate in caliches, probing
Research and Development Laboratory Antofagasta AAS, ICP-OES, potentiometry, conventional titration, solution density
Quality Control Laboratory Antofagasta Polarized light microscopy, particle size distribution
SEM and XRD Laboratory Antofagasta SEM and XRD
Pilot Plant Laboratory Nueva Victoria Physical characterization and ore leaching tests

 

SQM TRS Nueva Victoria Pag. 96

 

 

 

Iodine and nitrate testing facilities available at Caliche and Iodine Laboratories (LCY) in Antofagasta are certified under ISO-9001:2015. Certification was granted by TÜV Rheinland and is valid from 2020-2023.

 

It should be noted that part of the exploration efforts is focused on possible gold and copper metallic mineralization underneath the caliche. Therefore, samples are sent to external analytical laboratories that are independent from SQM and accredited and/or certified by the International Standards Organization (ISO):

 

Andes Analytical Assay (AAA) (ISO 9001 Certification).

 

ALS Global Chile (ISO/IEC 17025).

 

Centro de Investigación Minera y Metalúrgica (CIMM) (ISO/IEC 17025).

 

Testing and Relevant Results

 

10.1.8Metallurgical Recovery Estimation

 

Caliche characterization results are contrasted with metallurgical results to formulate relationships between elemental concentrations and recovery rates of the elements of interest or valuable elements and reagent consumption.

 

The relationships between reported analyses and recoveries achieved are as follows:

 

It is possible to establish an impact regarding recovery based on the type of salt matrix and the effect of salts in the leaching solution. With higher amounts of soluble salts, extraction is lower while higher calcium in SM results in higher extraction.

 

Caliches with better recovery performance tend to decant faster (speed) and compact better.

 

The higher presence of fines hinders bed percolation, compromising the ability to leach and ultrafine that could delay irrigation or cause areas to avoid being irrigated.

 

The higher hydraulic conductivity or permeability coefficient, better the leachability behavior of the bed.

 

For metallurgical recovery estimation, the formulated model contains the following elements:

 

Chemical-mineralogical composition.

 

Yield.

 

Physical characteristics: sedimentation velocity, compaction, percentage of fines and ultrafines, uniformity coefficient, and wetting.

 

SQM TRS Nueva Victoria Pag. 97

 

 

 

The metallurgical analysis is focused on determining the relationships associated with these variables, since the relationships can be applied to the blocks to determine deposit results. From a chemical and yield point of view, a relationship is established between unit consumption (UC, amount of water) or total irrigation salts (salt concentration, g/L) and iodine extraction. The best subset of the regressions was used to determine the optimal linear relationships between these predictors and metallurgical results. Thus, iodine and nitrate recovery equations are represented by the following formulas and Figure 10-9:

 

 

 

 

 

 

  

Figure 10-9. Iodine Recovery as a Function of total Salts Content.

 

 

The graph of Figure 10-9 compares iodine yield results for samples from two SQM resources, TEA and Pampa Orcoma (abbreviated as ORC), as a function of total salts. The mineral samples (MS) are differentiated by their percentage soluble salt content, so that sample MS-45 (TEA), for example, corresponds to a mineral sample from the TEA sector characterized by 45% soluble salts. Following this logic, MS-45 (ORC), corresponds to a mineral sample from Pampa Orcoma, which has a soluble salt content of 45%. As can be seen, an output matrix content of 65% implies a lower recovery compared to an ore content of 45%.

 

SQM TRS Nueva Victoria Pag. 98

 

 

 

In conclusion, the metallurgical tests, as previously stated, have allowed establishing baseline relationships between caliche characteristics and recovery. In the case of iodine, a relationship is established between unit consumption and soluble salt content, while for nitrate, a relationship is established depending on the grades of nitrate, unit consumption and the salt matrix. Relationships that allow estimating the yield at industrial scale.

 

10.1.9Irrigation Strategy Selection

 

In terms of physical properties, the metallurgical analysis allows to determine caliche classification as unstable, very unstable, stable, and very stable, which gives rise to an irrigation strategy in the impregnation stage. As a result, a parameter impact ranking is established in caliche classification, in the order indicated below (from higher to lower impact):

 

1. Compaction degree (C).

 

2. Sedimentation velocity (S).

 

3. Fines and ultrafines percentage (%f; percent passing #200) with wetting degree ().

 

4. Uniformity degree (Cu).

 

The weighting establishes a value to be placed on a scale of selection depending on the type of impregnation for the highest yield (see Figure 10-10):

 

Scale 1.1 to 1.9; pulse ramp 70 days of irrigation with intermediate solution.

 

Scale 1.9 to 2.6; pulse ramp 60 days of irrigation with intermediate solution.

 

Scale 2.6 to 3.3; pulse ramp 50 days of irrigation with water.

 

Scale 3.3 to 3.9; pulse ramp 40 days of irrigation with water.

 

SQM TRS Nueva Victoria Pag. 99

 

 

 

Figure 10-10. Parameter Scales and Irrigation Strategy in the Impregnation Stage.

 

 

10.1.10 Industrial Scale Yield Estimation

 

All the knowledge generated from the metallurgical tests carried out, is translated into the execution of a procedure for the estimation of the industrial scale performance of the pile. Heap yield estimation and irrigation strategy selection procedure is as follows:

 

  A review of the actual heap Salt Matrix was compared to results obtained from diamond drill hole samples from the different mining polygons. The correlation factor between the two is obtained, which allows determining, from the tests applied to diamond drill hole samples, how the heap performs in a more precise way.

 

  With the salt matrix value, a yield per exploitation polygon is estimated and then, through a percentage contribution of each polygon's material to heap construction, a heap yield is estimated.

 

  Based on percentage physical quality results for each polygon, i.e., C m/min, compaction, % fine material, Alpha, #-200, an irrigation strategy is selected for each heap.

  

For example, for Pile 583, the physical test showed that the pile tends to generate mud in the crown and was instable. A 60-day wetting was recommended to avoid generating turbidity. The recommendation was to irrigate at design rate.

 

The real composition for Pile 583, determined by the diamond drilling campaign by polygon is shown in the Table 10-9 in which some differences can be observed.

 

SQM TRS Nueva Victoria Pag. 100

 

 

 

 

Table 10-9 Comparison of the Composition Determined for the 583 Heap Leaching Pile in Operation at Nueva Victoria.

 

Type Real vs. Diamond Salts Matrix

Iodine grade

(ppm)

Nitrate grade

(%)

Na2SO4 Ca Mg K KClO4 NaCl Na H3BO3 Saline Soluble
Sample 400 4.0 17.9 2.0 1.3 0.5 0.1 10.1 4.3 0.3 57.8
Real 424 4.2 16.4 1.9 1.2 0.6 1.4 10.5 4.6 0.3 58.3

 

Through the established methodology, composition and physical properties, the resulting 583 pile yield estimate is 54.5%. The estimation scheme is as shown in Figure 10- .

 

Figure 10-11. Irrigation Strategy Selection

 

 

 

Following the example and in relation to the observed yield values contrasted with the values predicted by the model, the following graphs shows the annual yield of Nueva Victoria plant, both for iodine and nitrate, for the period 2008-2020.

 

The annual industrial throughput values with the values predicted by the model are shown in the Figure 10-12 in which a good degree of correlation is observed.

 

The annual industrial throughput values with the values predicted by the model are shown in the following figures and in which a good degree of correlation is observed.

 

SQM TRS Nueva Victoria Pag. 101

 

 

 

Figure 10-12. Nitrate and Iodine Yield Estimation and Industrial Correlation for the period 2008-2022.

 

 

 

 

 

SQM TRS Nueva Victoria Pag. 102

 

 

 

Table 10-10 Comparison of Industrial Yield with the Values Predicted by the Model.

 

Parameter Unit 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
Iodine Grade ppm 465 461 466 459 456 456 460 459 460 448
Nitrate Grade % 5.2% 4.5% 5.1% 5.8% 6.2% 6.2% 6.4% 6.2% 5.1% 5.1%
Cu water (unit consumption) m3/t 0.41 0.41 0.54 0.54 0.6 0.58 0.39 0.39 0.41 0.49
Caliche SS % 57.7% 54.6% 52.1% 54.0% 55.3% 56.8% 57.6% 57.5% 58.9% 59.5%
Industrial Yield  
Industrial Iodine Yield % 66.2% 62.2% 73.0% 73.7% 76.9% 76.3% 59.0% 55.0% 55.5% 58.4%
Industrial Iodine Yield Correlation % 60.0% 62.7% 75.4% 73.0% 76.4% 73.1% 57.9% 58.2% 58.2% 63.5%
Model Yield  
Industrial Nitrate Yield % 50.80% 59.40% 64.80% 69.00% 74.60% 70.60% 42.40% 40.30% 44.00% 50.20%
Industrial Nitrate Yield Correlation % 51.10% 55.10% 69.10% 67.90% 74.00% 68.90% 42.30% 42.30% 46.50% 52.40%

 

Complementary analysis has been carried out on the yield results, establishing that the CU is the determining factor for the increase in yield. The yield improvement is because there is an increase in the dissolution of salts due to the availability of more fresh water in the leaching process, reaching values of 70%. That is historically reflected in the years 2014 to 2017, for an average salt matrix material of 54.7%. The unit consumption for that period was in the range of 0.54-0.60 m3/ton, resulting in yields of 73-77%. This is graphically reflected in Figure 10-13, which correlates the degree of salt dissolution and the yield achieved:

 

Figure 10-13. Nitrate and Iodine Yield Extraction and Dissolutions of Salts.

 

 

 

Consequently, an increase in prill iodine production will be possible by making improvements at the operational level of the irrigation solutions, so that the replacement of recirculated water by fresh seawater in the process occurs. From the graph it is possible to infer that a salt dilution in the range of 50-60% would give way to a real increase in iodine yield of 60-70% by the exchange of seawater in the irrigation.

 

SQM TRS Nueva Victoria Pag. 103

 

 

 

Figure 10-14. Nitrate and Iodine Yield Extraction based on Unit Consumption and Purge Factor.

 

 

 

From the graph it can be inferred the unit consumption in the range of 0.45-0.55- m3/t would lead to a real increase in Iodine Yield of 64-75%. In the case of Nitrate Yield, the parameter with the highest incidence in the recovery calculation is the purge factor (PF), followed by the content of Soluble Salts and the Nitrate grade. For the Iodine Yield, the parameter with the greatest incidence in the calculation of its recovery is the unit consumption of water (CU), followed by the content of Soluble Salts and the grade of Iodine.

 

Purge Factor: Corresponds to the purging of AFA solution to pools by mass of treated caliche.

 

Unit Consumption: Corresponds to fresh water to leachate by mass of treated caliche.

 

SQM TRS Nueva Victoria Pag. 104

 

 

 

10.1.11Piloting Campaigns

 

The reserve pilots for industrial exploitation, carried out from 2014 for heaps 2015 onwards, until 2018, consist of tests developed so that the resulting complete piloting to projection process is:

 

Isocontainer leaching.

 

Simulation of Isocontainer.

 

Parameter scaling from Isocontainer to heap.

 

Correlation pit-stack from the loading polygons.

 

“Weighting” of simulation parameters: grades, granulometry, drainage curve, iodine adjustment factor.

 

Pile simulation according to the weighted parameters.

 

The company’s piling campaigns have been:

 

Isocontainer 2015, for piles 2016.

 

2016-2017 pilot campaigns

 

2017-2018 pilot campaign

 

2019 – 2020 pilot campaign

 

2020 – 2021 pilot campaign

 

The Isocontainer are plastic receptacles that are loaded in such a way as to replicate the segregation presented by industrial piles because of their loading method, and therefore the material is stacked in layers inside the reactor, as illustrated Figure 10-15.

 

Figure 10-15. Loaded Isocontainer and Distribution of Material by Particle Size.

 

  

 

 

 

    
a)     Isocontainer Test  b)     Isocontainer Loading Diagram

 

The tests were carried out with parameters corresponding to those of the Nueva Victoria industrial process on the test date, using seawater obtained from Caleta Buena, the point foreseen for future extraction. The test development conditions are as indicated in Table 10-11.

 

SQM TRS Nueva Victoria Pag. 105

 

 

 

Table 10-11 Condition for Leaching Experiments in Isocontainer.

 

Parameter Detaille
Mass 1,500 kg
Granulometry  +12'' -(-12''+6'')-(-6''+2'')-(-2'')
Test Duration 25.8 days
Impregnation 0.05 m3/t 1 L/h/m2
Irrigation Water - SI - Mixed - Washing

 

In the final campaigns (2017-2018), seeking a faster turnaround time, Isocontainer results were used directly, weighting them according to the shaft trial pits-pile correlation (empirical actor of 0.97 to estimate projection to pile). The operation of the piles was carried out at two irrigation rates (TR), 1.5 and 2 liters per hour square meter (L/h-m2) and unit water consumption (CU) of 0.53 m3/ton.

 

For the last pilot campaign carried out, the working conditions of the test were the following four:

 

Pilot Trial pits (calicatas) TEA Norte, CU 0.53 m3/ton, TR 2 L/h-m2, Leaching Ratio (RL) 0.9 m3/ton.

 

Pilot Trial pits (calicatas) TEA Sur, CU 0.53 m3/ton, TR 2 L/h-m2, RL 0.9 m3/ton.

 

Trial pits (calicatas) TEA Sur, CU 0.53 m3/ton, TR 1.5 L/h-m2, RL 0.9 m3/ton.

 

Trial pits (calicatas) NVO, CU 0.53 m3/ton, TR 1.5 L/h-m2, RL 0.9 m3/ton.

 

The test results of piques vs. industrial piles correspond, in process conditions close to those tested. TEA-North and TEA-South, under TR 2 L/h-m2 conditions, obtain an average I2 extraction of 69% and 65%, respectively. The TEA-South ponds treated at TR 1.5 L/h-m2 obtained a better iodine recovery of 67%.

 

The results have shown that the decrease in TR will have an effect of concentrating more of the solution going down the bed, and therefore cause a higher yield vs. RL. This has been demonstrated at the Isocontainer level, and can also be seen at the stack level, in cases where there is no change of solution, but only of rate.

 

Having defined the appropriate irrigation rate of 1.5 L/h-m2, the following projections, Figure 10-16, show the contrast of the actual pile and pilot recovery results. Through the graphs, it can be established that the tests have reflected the industrial performance in a good way, taking into consideration that an average behavior curve has been made for the piles at Isocontainer scale.

 

SQM TRS Nueva Victoria Pag. 106

 

 

 

Figure 10-16. Pile Curve 361 and 362 vs Average Pilot Curve for TR 1.5 L/h-m3 TEA Pilot Campaign.

 

 

 

a)     Iodine Yield contrast curve of 362 Pile

 

 

 

b)     Iodine Yield contrast curve of 362 Pile

 

The relevant results of the campaigns conducted are conclusive in the following aspects:

 

Lower values of 0.5 m3/ton, which will have a negative impact on actual vs projected yield. Likewise, TR increasing from values of 1.5 to 2 L/h-m2, will also have a negative impact on actual vs. projected yield.

 

Caliches of the same composition and grain size can have drastically different behaviors based on irrigation rate alone.

 

Harder/compact and higher salt content caliches will be more sensitive to irrigation rate.

 

Between two caliches of equal composition, the one with larger grain size will also be more sensitive to rate increase, since there are fewer exposed surface areas.

 

It is recommended to lower the operational TR for more refractory caliches such as TEA and control the particle size to provide yield benefit.

 

SQM TRS Nueva Victoria Pag. 107

 

 

 

Significant Risk Factors

 

Elements detrimental to recovery or to the quality of the product obtained pose a risk. Insoluble material and elements such as magnesium (magnesium sulfate or Epsom salt) and perchlorate in the raw material also poses a negative impact to the process. In this regard, this report has provided information on tests carried out on the process input and output flows, such as brine and finished products of iodine, potassium nitrate and sodium nitrate, for these elements, thus showing the company's constant concern to improve the operation and obtain the best product.

 

Plant control systems analyze grades and ensure that they comply with required threshold values and will not affect the concentration of valuable species in the brine or impact plant performance. Therefore, processing factors or deleterious elements that may have a significant impact on the potential economic extraction are controlled. For example, brines are monitored and those that are loaded with 2-2.5 g/L of Epsom salt are purged to waste ponds.

 

Along with the above, the company is also interested in developing or incorporating a new stage, process and/or technology that can mitigate the impact of known factors. This is achieved with constant focus on continuous improvement of the processes.

 

Qualified Person´s Opinion

 

10.1.12Physical and chemical characterization

 

Mineralogical and chemical characterization results, as well as physical and granulometric characterization of the mineral to be treated, which are obtained from the tests performed, allow to continuously evaluate different processing routes, both in initial conceptual stages of the project and during established processes, in order to ensure that such process is valid and up to date, and/or also to review optimal alternatives to recover valuable elements based on the nature of the resource. Additionally, analytical methodologies determine deleterious elements, to establish mechanisms in operations so that these can be kept below the limits to ensure a certain product quality.

 

10.1.13Chemical – Metallurgical Tests

 

Metallurgical test work performed in laboratories and pilot plants are adequate to establish proper processing routes for caliche resources.

 

Testing program has evidenced adequate scalability of separation and recovery methods established in plant to produce iodine and nitrate salts. It has been possible to generate a model that can assist with an operational plan for the initial irrigation stage to improve iodine and nitrate recovery in leaching.

 

Samples used to generate metallurgical data are sufficiently representative to support estimates of planning performance and are suitable in terms of estimating recovery from the Mineral Resources.

 

SQM TRS Nueva Victoria Pag. 108

 

 

 

10.1.14Innovation and Development

 

The company has a research and development team that has demonstrated important advances regarding development of new processes and products to maximize returns from exploited resources.

 

Research is developed by three different units covering topics, such as chemical process design, phase chemistry, chemical analysis methodologies, and physical properties of finished products. These address raw material characterization, operations traceability, and finished product.

 

SQM TRS Nueva Victoria Pag. 109

 

 

 

11Mineral Resource Estimate

 

Key Assumptions, Parameters and Methods

 

This sub-section contains forward-looking information related to density a grade for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecast or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that were set forth in this sub-section including actual in-situ characteristics that are different from the samples collected and tested to date, equipment and operational performance that yield different results from current test work results.

 

The resource estimation process is different depending on the drill hole spacing grid available in each sector:

 

Measured Mineral Resources: Sectors with a Block Model, with a drill hole spacing grid of 50 x 50 m or 100T were estimated with a full 3D block model using Ordinary kriging, which contains variables, such as Iodine, Nitrate, soluble salts, geology, geotechnics, topography, etc. For Nueva Victoria all sectors defined Measured Resources have an available Block Model.

 

Indicated Mineral Resources: Sectors with a Block Model; with a drill hole spacing grid of 100 x 100 m and 200 x 200 m were estimated with a full 3D block model using Inverse Distance Weighted (IDW) which contains variables, such as Iodine, Nitrate, soluble salts, geology, geotechnics, topography, etc. For Nueva Victoria all sectors defined Indicated Resources have an available Block Model.

 

Inferred Mineral Resources: Sectors with a drill hole spacing grid greater than 200 x 200 m up to 400 x 400m were estimated in 2D using the Polygon Method. This Inferred Resources do not have block model. the output are polygons which are then transformed to tonnage by multiplying by the area, thickness, and density.

 

11.1.1Sample Database

 

The 2022 Nueva Victoria Model included the estimate of Iodine and Nitrate, and in the case of smaller grids Measured Mineral Resources includes soluble Salts, elements, lithology, and hardness parameters.

 

Table 11-1 summarizes the basis statistics of Iodine and Nitrate for Nueva Victoria.

 

Table 11-1. Basic Sample Statistics for Iodine and Nitrate in Nueva Victoria

 

Variable Number of Samples Minimum Maximum Mean Std. Dev. Variance CV Kurtosis
Iodine 67,153 3.0 2272 376.28 320.31 102,599.6 0.85 9.15
Nitrate 67,153 0.1 21.2 5.28 3.79 14.33 0.72 4.5

 

SQM TRS Nueva Victoria Pag. 110

 

 

 

11.1.2Geological Domains and Modeling

 

For the estimation of each block within a geological unit (UG) only the composite grades, elements and hardness parameters found in that domain are used (Hard contact between UG). The main UG are described as:

 

Overburden, Cover (UG 1).

 

Mineralized mantle, Caliche (UG 2).

 

Underlying (UG 3).

 

11.1.3Assay Compositing

 

Considering that all the sample have the same length (0.5 m) and the block height is also 0.5 m, SQM did not composite the sample database and used directly in the estimation process.

 

11.1.4Evaluation of Outlier Grades, Cut-offs, and Grade Capping

 

Definition and control of outliers is a common industry practice that is necessary and useful to prevent potential overestimation of volumes and grades. SQM has not established detection limits (upper limit) in the determined grades of Iodine and Nitrates in the analyzed samples. The distribution of grades for both Iodine and Nitrates within the deposit were such that not samples were judged to be extreme, so no sample restrictions were used in the estimation process.

 

11.1.5Specific Gravity (SG)

 

There are no available SG samples in the database. SQM have been using a historic value of 2.1 (g/cc) for the calculations of tonnage, SQM performed a series of analyses for different DDH drill holes measuring the specific gravity in Nueva Victoria. Table 11-2 shows the analyzed drill holes, the specific gravity, and the geological unit (UG), these results justified the historical value used by SQM.

 

Table 11-2. Specific Gravity Samples in Nueva Victoria

 

Drill Hole Specific Gravity (g/cc) UG
567L 2.15 2
1941L 2.22 2
117L 2.28 2
2316L 1.84 1
1684L 2.14 2
2695L 2.23 2
CL-10 2.25 2
Al-06 2.07 2
1032L 2.23 2
MB-18-4 2.12 2
MB-12-29 1.96 1
2995L 2.05 2
Average 2.13

 

SQM TRS Nueva Victoria Pag. 111

 

 

 

11.1.6Block Model Mineral Resource Evaluation

 

As mentioned before, sectors with a drill hole spacing grid of 50 x 50 m or 100T m were estimated with a full 3D block model using Ordinary Kriging and the sector with a drill hole grid greater than 100T m and up to 200 x 200 m were estimated using Inverse Distance Weighted also using block model, for interpolation of Iodine, Nitrate, soluble salts, geology, geotechnics, topography, etc. For Nueva Victoria all sectors defined Measured and Indicated Resources have an available Block Model.

 

Block Model Parameters and Domaining Table 11-3 shows the definition for the block model built in Datamine Studio 3. The block size is 25 x 25 x 0.5 m in all sectors.

 

Table 11-3. Block Model Dimensions

 

Sector Parameters East North Elevation
Norte Origin (m) 428,425 7,689,400 951
Range (m) 10,700 5,450 153
Final (m) 439,125 7,694,850 1,104
Block Size 25 25 0,5
N° of Blocks 428 218 306
TEA Origin (m) 409,950 7,691,975 989
Range (m) 11,075 13,050 292
Final (m) 421,025 7,705,025 1,191
Block Size 25 25 0.5
N° of Blocks 443 522 404
Hermosa Origin (m) 414,950 7,704,175 1,066
Range (m) 9,100 9,050 179
Final (m) 424,050 7,713,225 1,245
Block Size 25 25 0.5
N° of Blocks 364 362 358
Torcaza Origin (m) 412,450 7,694,150 1,016
Range (m) 8,600 10,950 175
Final (m) 421,050 7,705,100 1,191
Block Size 25 25 0.5
N° of Blocks 344 438 350

 

SQM TRS Nueva Victoria Pag. 112

 

 

 

Figure 11-1 illustrates a plan view of the sectors with a block model inside Nueva Victoria

 

Figure 11-1. Block Model Location in Nueva Victoria.

 

 

Although there are overlaps between the boundaries of the Nueva Victoria Block Models, there is no duplication of blocks for the estimation of Mineral Resources, each of these models has the boundary of the other zones given by the different databases of each zone.

 

SQM TRS Nueva Victoria Pag. 113

 

 

 

11.1.6.1Variography

 

Experimental variogram where constructed using all the drill hole samples independent of the UG. The variogram is modeled and adjusted, obtaining parameters such as structure range and sill, nugget effect and the main direction of mineralization. Experimental variograms were calculated and modeled for Iodine and used in the estimation of both Iodine and Nitrate.

 

Table 11-4 describes the variogram models for Iodine used in each zone for the estimation of Iodine and Nitrate.

 

Table 11-4. Variogram Models for Iodine and Nitrate in Nueva Victoria

 

Sector Variable Rotation Nugget Effect Range 1 Sill 1
Z Y X Z Y X
Norte Iodine 0 0 0 6,943.3 0.5 80 80 46,577.1
TEA 45 0 0 18,928.5 0.5 100 150 79,464.0
Hermosa 45 0 0 20,714.3 0.5 160 145 59,523.0
Torcaza 0 0 0 39,821.0 0.5 80 80 50,350.7
                   
Sector Variable Rotation Nugget Effect Range 1 Sill 1
Z Y X Z Y X
Norte Nitrate 0 0 0 6.4 0.5 80 80 10.2
TEA 45 0 0 9.0 0.5 100 150 14.0
Hermosa 45 0 0 9.2 0.5 160 145 14.3
Torcaza 0 0 0 7.2 0.5 80 80 9.8

 

The nugget effect varies between 6% and 39% of the total sill, this suggests different behavior of Iodine between each zone. The total ranges are around 80 m to a maximum of 150 m. These variogram ranges are in line with the SQM´s definition of Measured Mineral Resources, namely estimates blocks using a drill hole grid of 50 x 50 m or 100T. (Block model evaluation).

 

The QP performed and independent analysis to confirm the variogram models used by SQM, in general, obtains similar nugget effect, total sill and variogram ranges to those used by SQM.

 

SQM TRS Nueva Victoria Pag. 114

 

 

 

Figure 11-2. Variogram Models for Iodine and Nitrate in Nueva Victoria.

 

 

 

11.1.6.2Interpolation and Extrapolation Parameters

 

The estimation of Iodine and Nitrate grades for Nueva Victoria has been conducted using Ordinary Kriging (KO) in one pass for each UG. SQM used cross-validation to determine the estimation parameters such as search radius, minimum and maximum number of samples used, etc. In the cross-validation approach, the validation is performed on the data by removing each observation and using the remaining to predict the value of remove sample. In the case of stationary processes, it would allow to diagnose whether the variogram model and other search parameter adequately describes the spatial dependence of the data.

 

The Block model is intercepted with the geological model to flag the geological units used in the estimation process.

 

The KO plan included the following criteria and restrictions:

 

No capping used in the estimation process.

 

Hard contacts have been implemented between all UG.

 

No octant restrictions have been used for any UG.

 

No samples per drill hole restrictions have been implemented for any UG.

 

SQM TRS Nueva Victoria Pag. 115

 

 

 

Table 11-5 summarizes the orientation, radii of searches implemented and the scheme of samples selection for each GU and sector. Search ellipsoid radio were chosen based on the variogram ranges.

 

Table 11-5. Sample Selection for each sector.

 

Sector Variable Rotation Nugget Effect Range 1   Samples
Z Y X Z Y X Minimum Maximum
Norte Iodine / Nitrate 0 0 0 6.4 0.5 80 80 3 20
TEA 45 0 0 9.0 0.5 100 150 3 20
Hermosa 45 0 0 9.2 0.5 160 145 3 20
Torcaza 0 0 0 7.2 0.5 80 80 3 20

 

After the estimation is done, a vertical reblocking was performed transforming the 3D block model in a 2D grid of points (coordinates X and Y) with the mean grades of all estimated variables. When the 2D grid points are available, operational and mine planning parameters are applied to determine tonnage/grade curves according to a 300 ppm cut-off grades for Iodine. Finally, GIS software (Arcview and Mapinfo) is used to draw the polygons, limiting the estimated Mineral Resources with economic potential.

 

An example of this methodology is shown in Figure 11-3 for Hermosa. The black line defines polygons above the cutoff grade and that comply with several operational conditions (at least 50 x 50 m, not isolated polygons, no infrastructure nearby, etc.).

 

Figure 11-3. Plan View of the Polygons Bordering The Mineral Resources Hermosa

 

 

 

SQM TRS Nueva Victoria Pag. 116

 

 

 

11.1.6.3Block Model Validation

 

A validation of the block model was carried out to assess the performance of the KO and the conformity of input values. The block model validation considers:

 

Statistical comparison between estimated blocks and samples grades of drill holes.

 

Global and local comparison between estimated blocks and samples through each direction (East, North and elevation) performing the following test: Anisotropy analysis, Search Neighborhood, Similarity analysis, Seasonality Analysis, Multivariate comparison, cumulative Distribution Function, Trend analysis Near Neighbor (NN).

 

Visual validation to check if the lock model matches the sample data.

 

11.1.7Global Statistics

 

The QP carried out a statistical validation between sample grades and estimated blocks. Global statistics of mean grades for the samples can be influenced by several factors, such as sample density, grouping, and, to a greater extent, the presence of high grades that have been restricted in the estimation plan.

 

Consequently, global statistics of samples grades were calculated using the Nearest-Neighbor (NN) method with search ranges like the one used in the estimation. A summary of this comparison is shown in Table 11-6 and Table 11-7 for Iodine and Nitrate respectively, where the negative values indicate a negative difference between block mean grades in relation to composite mean grades, and vice-versa. In general, differences under 5% are satisfactory, and differences above 10% require attention. The result of the estimate shows that relative differences are found within acceptable limits.

 

Table 11-6. Global Statistics comparison for Iodine

 

Sector # Data Minimun Maximun Mean Difference Std. Dev
Blocks NN Blocks NN Blocks NN Blocks NN Blocks NN
Norte 437,603 125,226 50 50 2,000 2,000 363 360 -2.99 158 245
TEA 1,230,674 152,279 50 50 2,000 2,000 308 305 -2.19 166 244
Hermosa 919,383 93,254 50 50 2,000 2,000 355 351 -3.4 165 262
Torcaza 289,242 53,478 50 50 2,000 2,000 262 259 -2.9 161 249

 

Table 11-7. Global Statistics comparison for Nitrate

 

Sector # Data Minimun Maximun Mean Difference Std. Dev
Blocks NN Blocks NN Blocks NN Blocks NN Blocks NN
Norte 437,603 125,226 1 1 20 20 3.76 3.83 0.07 2.14 3.25
TEA 1,230,674 152,279 1 1 20 20 5.03 5.09 0.06 2.81 4.03
Hermosa 919,383 93,254 1 1 20 20 5.73 5.81 0.08 2.03 3.91
Torcaza 289,242 53,478 1 1 20 20 3.43 3.45 0.02 2.37 3.65

 

SQM TRS Nueva Victoria Pag. 117

 

 

 

11.1.7.1Swath Plots

 

To evaluate how robust block grades are in relation to data, the following tests were performed to validate the robustness of the generated model (Anisotropy analysis, Search Neighborhood, Similarity analysis, Seasonality Analysis, Multivariate comparison, cumulative Distribution Function, Trend analysis Near Neighbor NN). From Figure 11-4 to Figure 11-7 provides a summary of plots for each variable for TEA. In general, results indicate that estimates reasonably follow trends found in the deposit’s grades at a local and global scale without observing an excessive degree of smoothing.

 

SQM TRS Nueva Victoria Pag. 118

 

 

 

Figure 11-4. Swath Plots for Iodine TEA

 

Anisotropy Analysis  Cross Validation Neighborhood Search
    
   

 

Analysis Similarity Model Data with Dendrograms  Multivariate Comparison
    
    

 

Seasonality Analysis

 

Direction E-W Direction N-S Elevation
     
   

 

Cumulative Distribution Function Cross Validation Variogram Used
   
 

 

SQM TRS Nueva Victoria Pag. 119

 

 

Figure 11-5. Swath Plots for Nitrate TEA

 

Anisotropy Analysis  Cross Validation Neighborhood Search
    
 

 

Analysis Similarity Model Data with Dendrograms  Multivariate Comparison
    
  

 

Seasonality Analysis

 

Direction E-W Direction N-S Elevation
     

 

Cumulative Distribution Function  Cross Validation Variogram Used
    
  

 

SQM TRS Nueva Victoria Pag. 120

 

 

 

Commentaries

 

From the analysis carried out, the following is concluded:

 

There is a slight anisotropy.

 

Vary the search ellipse, between 120 and 300 m provides very little to cross-validation, this mainly being a spatial structure where the first structure (which is the one that contributes the most to the variance) is of short scope and the second contributes very little to the total variance of the variogram its effect is minimal.

 

There is an improvement in search levels of the order of 160 m mainly in the effect this has on standardized error.

 

The similarity levels of the model respect the levels of similarity present in the samples of the drilling at a high level, this happens for both Iodine and Nitrate.

 

The correlation indices present in the original data between Iodine and Nitrate, are keep in the block model.

 

The model presents a slight optimism and underestimates in a very uninfluential way local uncertainty, both at the data level and at the distribution function level Theoretical.

 

The average of the analyzed region presents, at the level of samples, an average value of iodine of 305 ppm and at block level 308 ppm.

 

The average of the analyzed region presents, at level of samples an average nitrate of 5.03% and at block level 5.09%.

 

The cross-validation is of good quality with a high degree of robustness.

 

The model accurately represents the grades of the deposit in blocks of 25 x 25 x 0.5 both in Iodine and Nitrate. Presenting a slight optimism and very little influential underestimation of Local uncertainty.

 

SQM TRS Nueva Victoria Pag. 121

 

 

 

Figure 11-6. Swath Plots for Iodine Hermosa

 

Anisotropy Analysis Cross Validation Neighborhood Search
   
   
Analysis Similarity Model Data with Dendrograms Multivariate Comparison
   
 

 

Seasonality Analysis

 

Direction E-W Direction N-S Elevation
     
     

 

Cumulative Distribution Function Cross Validation Variogram Used
   
   

 

SQM TRS Nueva Victoria Pag. 122

 

 

 

Figure 11-7. Swath Plots for Nitrate Hermosa

 

Anisotropy Analysis Cross Validation Neighborhood Search
   
 
   
Analysis Similarity Model Data with Dendrograms Multivariate Comparison
   
 

 

Seasonality Analysis

 

Direction E-W Direction N-S Elevation
     

 

Cumulative Distribution Function Cross Validation Variogram Used
   

 

SQM TRS Nueva Victoria Pag. 123

 

 

 

Commentaries

 

From the analysis carried out, the following is concluded:

 

There is a slight anisotropy.

 

Vary the search ellipse, between 120 and 300 meters provides very little to cross-validation, this mainly being a spatial structure where the first structure (which is the one that contributes the most to the variance) is of short scope and the second contributes very little to the total variance of the variogram its effect is minimal.

 

There is an improvement in search levels of the order of 160 meters mainly in the effect this has on standardized error.

 

The similarity levels of the model respect the levels of similarity present in the samples of the drilling at a high level, this happens for both Iodine and Nitrate.

 

The correlation indices present in the original data between Iodine and Nitrate, are keep in the block model.

 

The model presents a slight optimism and underestimates in a very uninfluential way local uncertainty, both at the data level and at the distribution function level Theoretical.

 

The average of the analyzed region presents, at the level of samples, an average value of iodine of 351 ppm and at block level 355 ppm.

 

The average of the analyzed region presents, at level of samples an average nitrate of 5.81% and at block level 5.73%.

 

The cross-validation is of good quality with a high degree of robustness.

 

The model accurately represents the grades of the deposit in blocks of 25 x 25 x 0.5 both in Iodine and Nitrate. Presenting a slight optimism and very little influential underestimation of Local uncertainty.

 

SQM TRS Nueva Victoria Pag. 124

 

 

 

Figure 11-8. Swath Plots for Iodine Torcaza

 

Anisotropy Analysis Cross Validation Neighborhood Search
   
   
   
Analysis Similarity Model Data with Dendrograms Multivariate Comparison
   
 

 

Seasonality Analysis

 

Direction E-W Direction N-S Elevation
     

 

Cumulative Distribution Function Cross Validation Variogram Used
   
 

 

SQM TRS Nueva Victoria Pag. 125

 

 

 

Figure 11-9. Swath Plots for Nitrate Torcaza

 

Anisotropy Analysis Cross Validation Neighborhood Search
   
 
   
Analysis Similarity Model Data with Dendrograms Multivariate Comparison
   
 

 

Seasonality Analysis

 

Direction E-W Direction N-S Elevation
     

 

Cumulative Distribution Function Cross Validation Variogram Used
   
   

 

SQM TRS Nueva Victoria Pag. 126

 

 

 

Commentaries

 

From the analysis carried out, the following is concluded:

 

There is a slight anisotropy.

 

Vary the search ellipse, between 120 and 300 m provides very little to cross-validation, this mainly being a spatial structure where the first structure (which is the one that contributes the most to the variance) is of short scope and the second contributes very little to the total variance of the variogram its effect is minimal.

 

There is an improvement in search levels of the order of 160 m mainly in the effect this has on standardized error.

 

The similarity levels of the model respect the levels of similarity present in the samples of the drilling at a high level, this happens for both Iodine and Nitrate.

 

The correlation indices present in the original data between Iodine and Nitrate, are keep in the block model.

 

The model presents a slight optimism and underestimates in a very uninfluential way local uncertainty, both at the data level and at the distribution function level Theoretical.

 

The average of the analyzed region presents, at the level of samples, an average value of iodine of 259 ppm and at block level 262 ppm.

 

The average of the analyzed region presents, at level of samples an average nitrate of 3.45% and at block level 3.43%.

 

The cross-validation is of good quality with a high degree of robustness.

 

The model accurately represents the grades of the deposit in blocks of 25 x 25 x 0.5 both in Iodine and Nitrate. Presenting a slight optimism and very little influential underestimation of Local uncertainty

 

SQM TRS Nueva Victoria Pag. 127

 

 

 

11.1.7.2Visual Validation

 

To visually validate the Iodine a Nitrate estimation, the QP completed a review of a set of cross-sectional a plant view. The validation shows a suitable representation of samples in blocks. Locally, the blocks match the estimation samples both in cross-section and plant view. In general, there is an adequate match between composite data block model data for Iodine and Nitrates grades. High grades areas are suitably represented, and high-grade samples exhibit suitable control.

 

Figure 11- to Figure 11- present a series of horizontal plant views with the estimated model and the samples for Nitrate and Iodine in TEA, Hermosa and Torcaza.

 

Figure 11-10. Visual Validation of Nitrate Estimation, Plan View TEA

 

 

 

SQM TRS Nueva Victoria Pag. 128

 

 

 

Figure 11-11. Visual Validation of Iodine a Estimation, Plan View Hermosa

 

 

 

Figure 11-12. Visual Validation of Nitrate Estimation, Plan View Torcaza

 

 

 

SQM TRS Nueva Victoria Pag. 129

 

 

 

11.1.7 Polygon Mineral Resource Evaluation

 

This sub-section contains forward-looking information related to establishing the prospects of economic extraction for Mineral Resources for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecasts, or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that were set forth in this sub-section including cut-off grade assumptions, costing forecasts and product pricing forecasts.

 

For the sectors with a drill hole spacing grid greater than 200 x 200 m up to 400 x 400 m, the Mineral Resource evaluation was performed at the Polygon Method. Table 11-10 shows the parameters used to define the polygon with economic potential in Nueva Victoria.

 

Table 11-8. Economic and Operational Parameters Used to Define Economic Intervals for each Drill Hole in Nueva Victoria

 

Parameter Value
Mantle thickness More than 2.0 m
Cover thickness Less than 1.0 m
Waste/Mineral Ratio Less than 0.5
Nitrate Cut-off grade 3.0%
Iodine Cut-off grade 300 ppm

 

These parameters are the inputs that calculates for each polygon the economic potential which then are converted to tonnage using the multiplication of polygon area, thickness, and density (2.1 g/cc).

 

After the calculated and selected all the economic polygons SQM used the same methodology used in the block model evaluation to define polygons with material above cut-off grade and that comply with operational conditions.

 

SQM TRS Nueva Victoria Pag. 130

 

 

 

Mineral Resource Estimate

 

This sub-section contains forward-looking information related to Mineral Resources estimates for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecast or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that were set forth in this sub-section including geological a grade interpretations and controls and assumptions and forecast associated with establishing the prospect for economic extraction.

 

Table 11-9. summarizes The Mineral Resources estimate, exclusive of reserves, for nitrate and iodine in Nueva Victoria.

 

Table 11-9. Mineral Resource Estimate, Exclusive of Mineral Reserves, as December 31, 2022

 

Inferred Resource
Nueva Victoria Tonnage (Mt) Nitrate (%) Iodine (ppm)
Cocar 5.1 8.3 221
Los Angeles 9.3 9.0 331
Hermosa Oeste 15.5 4.7 387
TEA Oeste 1.2 4.0 397
Total 31.1 6.5 343

 

Notes:

 

(a)Mineral Resource are not Mineral Reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the Mineral Resources will be converted into Mineral Reserves upon the application of modifying factors.

 

(b)Mineral Resources are reported as in-situ and exclusive of Mineral Reserves, where the estimated Mineral Reserve without processing losses during the reported LOM was subtracted from the Mineral Resources inclusive of Mineral Reserves.

 

(c)Comparisons of values may not add due to rounding of numbers and the differences caused by used of averaging methods.

 

(d)The units “Mt”; %, and “ppm” refer to million tons, weight percent, and parts per million respectively.

 

(e)The Mineral Resource estimate considers a nitrate cut-off grade of 3.0 %, based on accumulated cut-off nitrate grades and operational averages grades, as well as caliche thickness ≥ 2.0 m and overburden thickness ≤ 1.0 m. The mean iodine grade considers the cost and medium-and long-term price forecast of generating iodine as discussed in Section 11.16 and 19 of this TRS.

 

(f)As the mineral resources estimation process is reviewed and improved each year, mineral resources could change in terms of geometry, tonnage, or grades.

 

(g)Marta Aguilera is the QP responsible for the Mineral Resources.

 

SQM TRS Nueva Victoria Pag. 131

 

 

 

Mineral Resource Classification

 

This sub-section contains forward-looking information related to Mineral Resources classification for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecast or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that were set forth in this sub-section including geological and grade continuity analysis and assumptions.

 

The Mineral Resources classification defined by SQM is based on drill hole spacing grid:

 

Measured Resources were defined using the drill holes grids of 50 x 50 m and 100 T m, which allows to delimit with a significant level of confidence the dimensions, mantle thickness and grades of the mineralized bodies as well as the continuity of the mineralization. Variability and uncertain studies carried out by SQM show a relative estimation error or 4.5 and 5.5 % for both grids, respectively.

 

Indicated Resources were defined using drill holes grids of 100 x 100 m and 200 x 200 m, which allows to delimit with a reasonable level of confidence the dimensions, mantle thickness, tonnage, and grades of the mineralized bodies. Variability and uncertain studies carried out by SQM show a relative estimation error or 7.6 and 8.3 % for both grids, respectively.

 

Inferred Mineral Resources were defined using drill holes grid greater than the 200 x 200 m and up to 400 x 400 m. When prospecting is carried out in districts or areas of recognized presence of caliche, or when the drill hole grids is accompanied by some prospecting in a smaller grid, confirming the continuity of mineralization, it is possible to anticipate that such resources have a sustainable base to give them a reasonable level of confidence, and therefore, to define dimensions, mantle thickness, tonnages, and grades of the mineralized bodies. The information obtained is complemented by the surface geology the definition of GUs.

 

Mineral Resource Uncertainty Discussion

 

Mineral Resource estimates may be materially affected by the quality of data, natural geological variability of mineralization and / or metallurgical recovery and the accuracy of the economic assumptions supporting reasonable prospects for economic extraction including metal prices, and mining and processing costs.

 

Inferred Mineral Resources are too speculative geologically to have economic considerations applied to them to enable them to be categorized as Mineral Reserves.

 

Mineral Resources may also be affected by the estimation methodology and parameters and assumptions used in the grade estimation process including top-cutting (capping) of data or search and estimation strategies although it is the QP’s opinion that there is a low likelihood of this having a material impact on the Mineral Resource estimate.

 

SQM TRS Nueva Victoria Pag. 132

 

 

 

Assumptions for Multiple Commodity Mineral Resource Estimate

 

For Nueva Victoria, the cut-off grade depends on nitrate and iodine grade. Nitrate is part of Iodine process.

 

Qualified Person’s Opinion on Factors that are Likely to Influence the Prospect of Economic Extraction

 

As Nueva Victoria is an active mine with more than 20 years of operational experience and data, it is the QP’s opinion that the relevant technical and economic factors necessary to support economic extraction of the Mineral Resource have been appropriately accounted for at the Mine.

 

The QP is not aware of any environmental, permitting, legal, title, taxation, socioeconomic, marketing, political or other relevant factors that could materially affect the Mineral Resource Estimate that are not discussed in this Technical Report.

 

SQM TRS Nueva Victoria Pag. 133

 

 

 

 

12Mineral Reserve Estimate

 

Estimation Methods, Parameters and Methods

 

This sub-section contains forward-looking information related to the key assumptions, parameters, and methods for the Mineral Reserve estimates for the Project. The materials factors that could cause actual results to differ materially from the conclusion, estimates, designs, forecast or projection in the forward-looking include any significant differences from one or more of the material factors or assumptions that were set forth in this sub-section including Mineral Resource model tons and grade and mine design parameters.

 

Mineral Reserves estimates are based on sample grades obtained from drill holes executed with reverse air drilling rigs in 200 x 200 m, 100 x 100 m, 100 T m (100 x 50 m) and 50x50 m grid spacing.

 

Measured Resources are evaluated from 3D blocks built by numerical interpolation techniques (Ordinary Kriging), where nitrate, iodine, and soluble salt content information available from data obtained in drill hole grids with a spacing equal to or less than 70 m (100T and 50 x 50 m).

 

Indicated Resources are evaluated from 3D blocks built by Inverse Distance Weighted (IDW) interpolation technique and defined by drill hole spacing of 100 x 100 m and 200 x 200 m.

 

Mineral Reserves considers SQM’s criteria for the mining plan which includes to the following:

 

Caliche Thickness ≥ 2.0 m

 

Overload thickness ≤ 1.0 m

 

Waste / Mineral Ratio ≤ 0.5

 

Nitrate 3.0 % cut-off grade.

 

The average production cost for iodine prill corresponds to 19.5 USD/kg and the sales price for Iodine derivatives is 40.0 USD/kg. For nitrate concentrate brine1, the average production unit cost is 82.31 USD/ton (mining, leaching, seawater pipeline, neutralization, and pond treatment) and the Nitrate salts for fertilizer price is 333 USD/ton.

 

The mining sectors consider in the mining plans (see figure 12-2) are delimited in base of the environmental licenses obtained by SQM and a series of additional factors (layout of main accesses, heap and ponds locations, distance to treatment plants, etc.). Mining is executed in blocks of 25 x25 m and the volumes of caliche to be extracted are established considering an average density value applied to 2.1 t/m³ for the deposit.

 

Using these criteria SQM estimated volumes (caliche) to be considered as Proven Reserves based on the 3D block models built, to define Measured Mineral Resources, and applying the criteria defined above to determine the mining plan.

 

SQM TRS Nueva Victoria Pag. 134

 

 

 

 

1 Correspond to the brine enriched in nitrate salts (AFA-Acid Water Feble) neutralized and treated in ponds (Salar Sur Viejo) that SQM transport to Coya Sur plant produce Potassium Nitrate Fertilizers mixing with KCL from Salar de Atacama.

 

The Indicated Resources estimated by Inverse Distance Weighted method using the Nitrate and Iodine grades and other relevant data obtained from medium density drill hole prospecting grids (100 x 100 m and 200 x 200 m) are stated as Probable Reserves using the same criteria for mineral reserves describes above, caliche and overload thickness, waste/mineral rates, and Nitrate cut-off grade.

 

To convert Indicated Resources in Probable Reserves, SQM use a unit conversion factor for tonnage considering the layered, shallowed, and sub-horizontal geological features of “caliches” and the mining process to extract the ore. Nevertheless, the intrinsic geological variability of the mineral deposit, perceived when comparing the results obtained from medium density drill hole spacing prospecting surveys (100 x 100 m and 200 x 200 m) with higher density surveys (100T m or 50 x 50 m), indicates using coefficient below the 1.0 for Nitrates and Iodine grades for the conversion Indicated Resources to Probable Reserves.

 

The historical data collected by SQM during decades of mining exploitation of caliches in Chile implies the use of different values for grade conversion depending on the mine. For Nueva Victoria mine, SQM’s mining experience indicates the use of a coefficient of 0.90 for Iodine and 0.85 for Nitrate for Probable Reserves evaluated from Indicated Resources.

 

Was executed and analysis using 3D model blocks built with the information derived from the database from the prospecting drill hole surveys (100 x 100 m and 200 x 200 m) in the TEA sector of Nueva Victoria mine, reviewing the base data, variograms for nitrate and iodine grades and Ordinary Kriging interpolation, to reconcile these with 3D blocks models obtained from 3D Model Block with combine all the data of the prospecting surveys execute in TEA sector (100 x 100 m and 200 x 200 m and 50 x 50 m).

 

The purpose was to verify the criteria used to convert Indicate Resources to Probable Reserves. The results of the reconciliation exercise are as follow (Figure 12-1 and table 12-1):

 

The average Nitrate and Iodine grades obtained by the 3D Block Model built using the 200 x 200 m database higher than the average grades obtained by the 3D Block Model built by the 100T m database.

 

The average Nitrate and Iodine grades and tonnage obtained by the 3D Block Model built using 100T m database (100x50 m drill hole spacing grid) and the 3D Block Model built to estimate Resources (using collectively base data form 50 x 50 m, 100 x 100m and 200 x 200 m) are similar.

 

The average Iodine and Nitrate grades obtained by the 3D Block Model built using only 200 x 200 m database are higher than the average grades obtained by the 3D Block Model built using the whole entire database (using collectively base data form 50 x 50 m, 100 x 100m and 200 x 200 m.

 

SQM TRS Nueva Victoria Pag. 135

 

 

 

 

Based on the SQM experience and the result obtained to compare data from different grid geological investigations, justify the use of coefficients below a value of one for nitrate and iodine grades to convert Indicate Resources to Probable Reserves, as show in accounts for the variability of the caliche deposits.

 

Figure 12-1. Results of the 3D Block Models Conciliation

 

 

 

Prospecting drill hole grid – Tente en el Aire (TEA) sector Nueva Victoria Mine.

 

Table 12-1. Results of 3D Block Model Reconciliations

 

SOURCE CUT-OFF
Nitrate (%)
Nitrate (%) Iodine (ppm) Tonnage (Mt) Nitrate
(Mt)
Iodine (Kt)
3D Model Block  SQM (MBSQM) 3.0 5.9 448 324 1.9 145.3
3D Model Block  100T (MB100T)   5.8 428 322 1.9 137.6
3D Model Block 200x200 m (MB200)   6.6 460 319 2.1 147
Difference: (MB100T - MBSQM)/ MB100T   -1% -4% -1% -1% -5%
Difference: (MBSQM - MB200)/ MBSQM   -12% -3% 1% -10% -1%
Difference: (MB100T - MB200)/ MB100T   -11% -7% 1% -11% -6%

 

SQM TRS Nueva Victoria Pag. 136

 

 

 

Figure 12-2 Map of Reserves Sectors in Nueva Victoria

 

 

 

SQM TRS Nueva Victoria Pag. 137

 

 

 

Cut-off Grade

 

SQM´s has historically used an operational cut-off grade of 300 ppm of iodine; for this year´s report has been used operational cut-off grade of 3.0% of Nitrate. The QP has reviewed the cut-off and agrees that at cut-off of 3.0% nitrate is conservative and will more than pay all mining cost and iodine production cost. Additional nitrate production profits will enhance the economics, and that the nitrate cut-off is appropriate for operations.

 

Classification and Criteria

 

This sub-section contains forward-looking information related to the Mineral Reserve classification for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimate, designs, forecast or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that were set forth in this sub-section including Mineral Resources model tons, grade, and classification.

 

The geological features of the mineral deposits (sub-horizontal, superficial, and limited thickness) allow to consider all the estimated Measured and Indicated Mineral Resources and Mineral Reserves, because, regardless, the method of mining extraction used by SQM (drill & blast, continuous miner), the entire volume/mass of Mineral Resources defined as Measured or Indicated can be extracted.

 

Any mining block (25x25 m) that can´t be extracted due to temporary infrastructure limitations (pond, pipes, roads, etc.), are still counted as Mineral Reserves since they may be mined once the temporary limitations are removed.

 

Proved Reserves have been determined based on Measured Resources, considering the rules set for tonnage and grades conversion (direct conversion of tonnage and grades). Measured Resources are classified as describe in section 11.3 with modifying factors, as described in section 12.1.

 

Probable Reserves has been determined from Indicated Resources, which are classified as described in section 11.3. Additional criteria as described in section 12.1 are applied in conjunctions with conversion factors for grade conversions as described in section 12.1 and summarized in table 12-2. SQM applies a conversion factor of 0.85 for nitrate and 0.90 for iodine grades.

 

SQM TRS Nueva Victoria Pag. 138

 

 

 

Mineral Reserves

 

This sub-section contains forward-looking information related to the Mineral Reserve estimates for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimate, designs, forecast or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that were set forth in this sub-section including Mineral Resources model tons and grade, modifying factors including mining and recovery factors, production rate and schedule, mining equipment productivity, commodity market and prices and projected operating and capital costs.

 

Nueva Victoria mine is divided into three sectors: Nueva Victoria, Tente en el Aire (TEA) and Hermosa. Each sector is further subdivided into exploitation sub-sectors (see Figure 12-2).

 

The Nueva Victoria Sector (located at the SW Sector) contains the following sub-sectors:

 

Mina Sur, Mina Oeste, Oeste 3, Torcaza and Franja Oeste;

 

The Tente en el Aire (TEA) Sector (Central Sector) contains the following sub-sectors:

 

TEA, TEA Oeste, TEA Sur, TEA Central, Fortuna, Pampa Engañadora and Cocar;

 

Finally, the Hermosa Sector (North and NE Sector):

 

Hermosa, Hermosa Oeste and Coruña

 

SQM extracts “caliches” from these sectors within areas having environmental license currently approved by the Chilean authorities. Soon, SQM plans to obtain additional environmental licenses to extend the mining into the TEA sector.

 

SQM exploits caliche at a rate of up to 37,000 ktpy for Nueva Victoria plant site (Exempt Resolution N°0515/2012), and a rate of up to 28,000 ktpy for TEA Project (Exempt Resolution 0047/2022), which implies a caliche production of 65,000 ktpy of caliche extraction in Nueva Victoria.

 

In 2022 caliche mining production targeted 44.5 Mt of Proved Reserves2 with an iodine grade averaging 430 ppm I2 and nitrate salts of 5.9% NaNO3. This implies an average mining rate of 12.4 kt of iodine and 2,611 kt of nitrates in 2022.

 

SQM's Mining Plan for 2023-2040 (Nueva Victoria-SQM Industrial Plan) sets a total extraction of 773 Mt of caliche with production ranging between 44,000 and 65,000 ktpy. 71% (546 Mt) of this material will be extracted by blasting and 29% (226 Mt) by continuous miner. Iodine average grade is 422 ppm and Nitrate average grade is 5.3% for the long term of mine (LP).

 

2 The Five-Year Mining Plan (5YP) in Nueva Victoria mine is defined by the exploitation of Proved Reserves. Every year SQM execute a plan to re-categorization the prospecting grid used to define indicate Resources (100 x 100 m or 200 x 200 m) to convert these to Measured Resources using a higher density drill hole spacing grid (100 T m or 50 x50 m).

 

SQM TRS Nueva Victoria Pag. 139

 

 

 

 

The criteria for estimating Mineral Reserves are as described below:

 

Measured Mineral Resources defined by 3D Model block and ordinary kriging using data from high resolution drill hole spacing campaigns (100T m or 50 x 50 m) are used to establish Proven Mineral Reserves using a unit coefficient conversion for tonnage and Iodine and Nitrate grades (see Table 12-2).

 

Indicated Mineral Resources defined by 3D Model Block an Inverse Distance Weighted using data from medium resolution drill hole spacing campaigns (100 x 100 m and 200 x 200 m) are converted to Probable Mineral Reserves using a coefficient equal one for tonnage conversion and coefficients lower than one for iodine and nitrate grades as consequence of natural variability of grades in the mineral deposit for coarser drill grids (see Table 12-2).

 

All the prospected sectors at Nueva Victoria have an environmental license to operate, considering the mining method used by SQM (drill-and-blast and CM) and the treatment by heap leach structures to obtain enriched brines of iodine and nitrates.

 

Table 12-2 Resources to Reserves Conversion Factors at the Nueva Victoria Mine

 

Measured Resources Proven Reserves
Tonnage (Mt) Nitrate (%) Iodine (ppm)
100T (100 x 50 m) 1.0 1.0 1.0
50 x 50 m 1.0 1.0 1.0
4
Indicated Resources Probable Reserves
Tonnage (Mt) Nitrate (%) Iodine (ppm)
100 x 100 m 1.0 0.85 0.90
200 x 200 m 1.0 0.85 0.90

 

Notes:

 

1. Grade variability depends on the prospecting drill hole spacing.

 

2. Reconciliation analysis using grades/tonnages obtained from 100 x 100 m or 200 x 200 m against those obtained from 100T or 50 x 50 m indicates the need to use conversion coefficients lower than 1 on grades.

 

SQM TRS Nueva Victoria Pag. 140

 

 

 

 

Modifying Factors

 

The modifying factors are considered herein. All permits are current and although there are no formal agreements, the operations have longstanding relationships with the communities, some of which are company towns. Mining, processing, downstream costs, mining loss, dilution, and recoveries are accounted for in the operational cutoff grade. As the project has been in operation since 2002, the risks associated with operating costs and recoveries are considered minimal.

 

Based on the described rules for resources to reserves conversion and qualification, the Proven Mineral Reserves and Probable Mineral Reserves of Nueva Victoria has been estimated as shown in Table 12-3 summarizes the estimated Mineral Reserves in the different sectors investigated by SQM in the Nueva Victoria mine.

 

Table 12-3 Mineral Reserves at the Nueva Victoria Mine (Effective 31 December 2022)

 

  Proven Reserves Probable Reserves Total Reserves
Tonnage (Mt) 219.5 553 772.5
Iodine Grade (ppm) 441 415 422
Nitrate Grade (%) 5.9 5.1 5.3
Iodine (kt) 96.8 229.5 326.3
Nitrate (kt) 12,951 28,203 41,154

 

Notes:

 

a) Mineral Reserves are based on Measured and Indicated Mineral Resources at an operating cutoff of 3.0 % nitrate. Operating constraints of caliche thickness ≥ 2.0 m; overburden thickness ≤ 1.0 m; and waste / caliche ratio ≤ 0.5 are applied.

 

b) Proven Mineral Reserves are based on Measured Mineral Resources at the criteria described in (a) above.

 

c) Probable Mineral Reserves are based on Indicated Mineral Resources at the criteria described in (a) above with a grade call factor of 0.9 for iodine and 0.85 for nitrates confirmed by operating experience.

 

d) Mineral Reserves are declared as in-situ ore (caliche).

 

e) The units “Mt”, “kt”, “ppm” and % refer to million tons, kilotons, parts per million, and weight percent respectively.

 

f) Mineral Reserves are based on a Nitrate price of 333 USD/ton and an Iodine price of 40.0 USD/Kg. Mineral Reserves are also based on economic viability as demonstrated in an after-tax discounted cashflow (see Section 19).

 

g) Marta Aguilera is the QP responsible for the Mineral Reserves.

 

h) The QP is not aware of any environmental, permitting, legal, title, taxation, socioeconomic, marketing, political or other relevant factors that could materially affect the Mineral Reserve estimate that are not discussed in this TRS.

 

i) Comparisons of values may not total due to rounding of numbers and the differences caused by use of averaging methods.

 

SQM TRS Nueva Victoria Pag. 141

 

 

 

The final estimates of Mineral Reserves by sector are summarized in the Table 12-4. The procedure used to check the estimates as follows:

 

Verified tonnage and average grades (iodine and nitrate) as Mineral Reserves by sectors with the measured and indicated resources previously analyzed (Section 11).

 

Checked that the sectors with estimated Mineral Reserves by SQM are in areas with environmental licenses approved by the Chilean authorities while also considering application of modifying factors.

 

Checked that the rules and factors previously described to convert Measures Resources to Mineral Reserves (tonnage and grade) have been correctly applied.

 

Confirmed that each sector with Mineral Reserves is considered in the Long Term mine plan (2023-2040) and the total volume of mineral ore (caliche) is economically mineable.

 

Considered the judgment of the Qualified Person in respect of the technical and economic factors likely to influence the prospect of economic extraction.

 

Table 12-4 Reserves at the Nueva Victoria Mine by Sector (Effective 31 December 2022)

 

Mining Proved Probable Reserves
Tonnage
(MTon)
Nitrate
(%)
Iodine
(ppm)
Tonnage
(MTon)
Nitrate
(%)
Iodine
(ppm)
Tonnage
(MTon)
Nitrate
(%)
Iodine
(ppm)
Nueva Victoria 37.9 4.9 405 108 4.2 403 145.9 4.4 404
Tente en el Aire 22.4 4.7 402 265 5.2 412 287.4 5.2 411
Hermosa 159.2 6.3 455 180 5.4 428 339.2 5.8 441
Total 219.5 5.9 441 553 5.1 415 772.5 5.3 422

 

Exploitation sector of Nueva Victoria comprises:

 

West Mine, West 3, Torcaza and Franja Oeste (see ubication in the Figure 12-2 (Map of Reserve Sectors in Nueva Victoria).

 

Exploitation sector of Tente en el Aire (TEA) includes:

 

TEA Oeste, TEA Sur, Fortuna, Pampa Engañadora and Cocar (see ubication in the Figure 12-2 (Map of Reserve Sectors in Nueva Victoria).

 

Exploitation sector of Hermosa considers:

 

Hermosa, Hermosa Oeste, and Coruña (see ubication in the Figure 12-2 (Map of Reserve Sectors in Nueva Victoria).

 

12.5 Qualified Person’s Opinion

 

The estimate of mineral reserves is based on Measured and Indicated Mineral Resources. This information has been provided in reference to Nueva Victoria. The Competent Person has audited the mineral resource estimate and modifying factors to convert the measured and indicated resources into proven and probable reserves.

 

The Competent Person has also reconciled mineral reserves with production and indicates that such reserves are appropriate for use in mine planning.

 

SQM TRS Nueva Victoria Pag. 142

 

 

 

 

13Mining Methods

 

SQM provided with production forecasts for the period from 2023 to 2040 (Mining Plan MP). This Mining Plan was checked that the planned exploitation sectors had environmental licenses approved by the Chilean authorities; the total tonnage and average Iodine and Nitrate grades were consistent with estimated Mineral Reserves; the total volume of mineral ore (caliche) is economically mineable and the production of prilled Iodine and Brine Nitrate Concentrate (Brine Nitrate) set by SQM is attainable, considering the dilution and mass losses for mining and recovery factors for leaching and processing

 

Mining at the Nueva Victoria mine comprises soil and overload removal, mineral extraction from the surface, loading and transport of the mineral (caliche) to make heap leach pads to obtain iodine and nitrate-enriched solutions (brine leach solution).

 

Mineralization can be described as stratified, sub-horizontal, superficial (≤ 5.0 m), and limited thickness (3.0 m average). The extraction process of the mineral is constrained by the tabular and superficial bedding disposition of the geological formations that contain the mineral resource (caliches). This mining process has been approved by local mining authorities in Chile (SERNAGEOMIN) 3. Generally, extraction consists of a few meters’ thick excavation (one continuous bench of up to 6.0 m in height (overburden + caliche) where the mineral is extracted using traditional methods - drilling and blasting and a CM. Extracted ore is loaded by front loaders and/or shovels and transported by rigid hopper mining trucks to heap leach structures.

 

The concentration process starts with leaching in situ by means of heap leach pads irrigated by drip/spray to obtain an iodine and nitrate enriched solution that is sent to treatment plants to obtain the final products. The mining and extraction process is summarized in Table 13-1.

 

3 SERNAGEOMIN Resolution 1469/2005 of June 30, 2005 (" Ordinance for Regularization of Mine Exploitation Method and mineral treatment and expansion of Nueva Victoria mine and iodide plant"); updated by SERNAGEOMIN Resolution 0515/2012 of November 29, 2012, in accordance with Article 22 of D.S. No. 132/04, Ministry of Mining, Mining Safety Regulations).

 

SQM TRS Nueva Victoria Pag. 143

 

 

 

 

Table 13-1. Summary of Nueva Victoria-SQM caliche mine characteristics

 

Mining System Opencast with a single and continuous bench with a height of up to 6 m
Drilling Atlas Copco Model F9 and D7
Blast Mining (Explosive) ANFO, detonating cord, 150 gr APD booster and non-electric detonators.
Power factor 0.365 kg/ton
Continuous Mining Surface excavator (tractor with cutting drum)
Loading and Transportation Front loaders (12 to 14 m3), 100 to 150 t trucks (60 m3 to 94 m3 capacity)
Topsoil Stripping (overburden removal) 0.15 m3 of soils and overburden / ton of caliche
Caliche Production 122,500 tons per day (tpd)
Dilution Factor ± 10 ppm Iodine (< 2,5%)
Recovery Factor 56% of Iodine and 52% of Nitrate (2008 - 2022 period)
Heap Leaching Water Consumption 0.39 to 0.60 m3/ ton leached caliche (2008 - 2022 period)
Sterile(a) / Ore Mass Ratio 1 t: 2.36 t

 

(a)This material is used by SQM to build the base of the heap pads. The final volume of waste material is negligible.

 

Geotechnical and Hydrological Models, and Other Parameters Relevant to Mine Designs and Plans

 

This sub-section contains forward-looking information related to mine design for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecasts, or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that were set forth in this sub-section.

 

Mining at Nueva Victoria is relatively simple, as it is only necessary to remove a surface layer of sterile material (soil + overburden) up to 1.0 m thick (sandstone, breccia, and anhydrite crusts), which is removed. Subsequently the ore (caliche) is extracted, which has a thickness of 1.50 to 6.0 m (average of 3.0 m). Caliche's geotechnical characteristics (Polymictic Sedimentary Breccia) allow a vertical mining bench face, allowing increased efficiency in the exploitation of the mining resources.

 

The mining conditions do not require physical stability analysis of the mining working face; therefore, no specific geotechnical field investigations and designs are required. One single final bench of about 4.70 m average height (1.0 m of soil + overburden and 3.2 m of caliche) is typical of the operations (Figure 13-1).

 

SQM TRS Nueva Victoria Pag. 144

 

 

 

 

Figure 13-1. Stratigraphic Column and Schematic Profile, and Schematic Mining Process in Nueva Victoria Caliche Mine

 

 

 

Due to its practically non-existent surface runoff and surface infiltration (area with very low rainfall) and its shallow mining depth, the water table is not reached during excavation. Therefore, no surface water management and/or mine drainage plans are required to control groundwater and avoid problems arising from the existence of pore pressures.

 

Therefore, this mining operation does not require detailed geotechnical, hydrological, and hydrogeological models for its operation and/or mining designs and mining plans.

 

Two methods are used in the mining operation: blasting and continuous surface mining. The selection of the method to be used in each sector depends on a variable defined by the hardness of the caliche to be excavated and its proximity to infrastructure, where there may be a potential risk of blasting damage.

 

The hardness is established during geological surveys and exploration and relates to the following qualitative technical criteria as judged by the geologist in the field from boreholes:

 

SQM TRS Nueva Victoria Pag. 145

 

 

 

 

Caliche drilled borehole section that exhibits collapse and/or roughness in diameter is rated as Soft (Hardness 1) or Semi-Soft (Hardness 2).

 

Borehole section drilled in caliche that exhibits a consistent and smooth borehole diameter is rated as Hard (Hardness 3).

 

This parameter is included in the block model and is used in decision-making on mining and heap leach shaping.

 

Extracted mineral is stockpiled in heaps located in same general area of exploitation. Heap leach pads are constructed in previously mined-out areas. The pads are irrigated to leach the target components (iodine and nitrates) by aqueous dissolution (pregnant brine solution).

 

SQM has analyzed heap leach stability4 to verify the physical long-term stability of these mining structures under adverse conditions (maximum credible earthquake). Geomechanical conditions analyzed for heap leaching facilities that are already closed have been considered, which have the following characteristics:

 

Wet density of 20.4 kilonewtons per cubic meter (kN/m³).

 

Internal friction angle of 32º.

 

Cohesion of 2.8 kPa.

 

A graded compacted material is used to support the liner on which the piles rest. The specification is based on experience and is generally defined by a wet density of 18.5 kN/m³, an angle of friction (𝜙) of 38° and no cohesion. Between the soil base and heap material there is an HDPE sheet that waterproofs the heap leach pad foundation. The interface between geomembrane HDPE and the drainage layer material is modelled as a 10 cm thick layer of material and a friction angle 𝜙 = 25° is adopted, which represents generated friction between the soil and the geomembrane.

 

Maximum acceleration value for the maximum credible earthquake is set at 0.86 G (G = 9.8 ) and for the design earthquake it is set at 0.35 G.

 

The horizontal seismic coefficient (Kh) was set through expressions commonly used in Chile and the vertical seismic coefficient (Kv) was set according to NCh 2369 Of. 2003, as 2/3 of the horizontal coefficient. Therefore, in the stability analysis of heaps, a Kh value of 0.21 and Kv of 0.14 was used for the maximum credible earthquake; and a Kh of 0.11 and Kv of 0.07 were used for the design earthquake.

 

4INFORME TÉCNICO ANÁLISIS DE ESTABILIDAD DE TALUDES PILAS 300 Y 350. SQM N° 14220M-6745-800-IN-001. PROCURE Servicios de Ingeniería (21146-800-IN-001), May 2021

 

SQM TRS Nueva Victoria Pag. 146

 

 

 

 

The stability analysis was executed using the static dowel equilibrium methodology (Morgenstern-Price Limit Equilibrium method) and GeoStudio’s Slope software, with results that comply with the minimum Factor of Safety criteria.

 

Based on the analysis developed in this document, it is possible to draw the following conclusions (Table 13-2 and Figure 13-2):

 

The slopes of the heaps analyzed in their current condition are stable against sliding.

 

None of the heaps will require slope profiling treatment after closure.

 

Table 13-2. Summary Results of Slope Stability Analysis of Closed Heap Leaching (Nueva Victoria)

 

Heap pad Number Static case (FS adm = 1,4) Pseudo-static design earthquake
(FS adm = 1,2)
Pseudo-static maximum credible earthquake
 (FS adm = 1,0)
300 1.93 1.42 1.09
350 1.91 1.42 1.1

 

Figure 13-2. Geotechnical Analysis Results: Heap #300, Hypothesis Maximum Credible Earthquake

 

 

 

TECHNICAL REPORT ‘’ANÁLISIS DE ESTABILIDAD DE TALUDES PILAS 300 Y 350’’. Document SQM N° 14220M-6745-800-IN-001. PROCURE Servicios de Ingeniería (21146-800-IN-001), May 2021.

 

SQM TRS Nueva Victoria Pag. 147

 

 

 

Production rates, expected mine life, mining unit dimensions, and mining dilution and recovery factors

 

The MP considers a total caliche extraction of 773 Mt, with a production decreasing from 44 Mtpy to 40 Mtpy, as shown in Table 13-3. For the MP total caliche to be extracted is projected to have iodine grades ranging between 410 to 440 ppm and nitrate grades between 4.99 % and 5.8%.

 

With an average Iodine grade of 422 ppm (0.042%), gross iodine prill production is estimated to be at 30 tpd (10.850 tpy of iodine). Likewise, for a Nitrate average grade of 5.3 %, average Nitrate salts for fertilizer production is estimated to be at 2,458 tpd (897 ktpy of nitrate salts for fertilizer).

 

The mining area extends over an area of 40 km x 50 km (see Figure 12-2). The mining sequence is defined based on the productive thickness data established for caliche from geological investigations, approved mining licenses exist, distances to treatment plants and ensuring that mineral is not lost under areas where infrastructure is planned to be installed (heap bases, pipelines, roads, channels, trunk lines, etc.). Areas with future planned infrastructure are targeted for mining prior to establishing these elements or mined after the infrastructure is demobilized.

 

Mineral Reserves considers SQM's criteria for the mining plan which includes the following:

 

Caliche Thickness ≥ 2.0 m.

 

Overburden thickness ≤ 1.0 m.

 

Waste / Mineral Ratio ≤ 0.5.

 

Nitrate (3.0 %) cut-off grade.

 

In addition to the above-mentioned operational parameters, the following geological parameters are also considered for determining the mining areas:

 

Lithologies.

 

Hardness parameters.

 

Total salts (caliche salt matrix) which impact caliche leaching.

 

Total salts elements (majority ions) which impact caliche leaching.

 

GPS control over the mining area floor is executed during mining to minimize dilution of the target iodine and nitrate grades.

 

SQM TRS Nueva Victoria Pag. 148

 

 

 

Table 13-3. Mining Plan (2023-2040)

 

MATERIAL MOVEMENT UNITS 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 TOTAL
Nueva Victoria Sector Ore Tonnage Mt 16 16 16 16 16 16 16 16 0 0 0 0 0 0 0 0 0 0 128
Iodine (I2) in situ ppm 417 416 388 386 386 389 414 410 0 0 0 0 0 0 0 0 0 0 401
Average grade Nitrate Salts (NaNO3) % 5.8% 4.7% 4.5% 4.0% 4.0% 4.2% 5.2% 4.7% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.6%
Tente en el Aire (TEA) Sector Ore Tonnage Mt 10 10 10 10 10 10 10 10 10 10 10 0 0 0 0 0 0 0 110
Iodine (I2) in situ ppm 403 403 420 400 429 404 405 394 364 403 404 0 0 0 0 0 0 0 403
Average grade Nitrate Salts (NaNO3) % 4.3% 4.3% 5.4% 5.0% 5.2% 4.5% 4.1% 4.0% 4.0% 4.1% 4.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.4%
Hermosa Sector Ore Tonnage Mt 18 18 18 18 18 18 18 18 34 34 33 43 42 42 41 41 41 40 535
Iodine (I2) in situ ppm 482 460 478 464 466 441 459 428 423 424 425 418 421 417 422 422 415 422 431
Average grade Nitrate Salts (NaNO3) % 6.6% 6.1% 6.4% 6.2% 6.6% 6.2% 5.8% 5.8% 5.9% 5.5% 5.4% 5.4% 5.3% 5.4% 5.3% 5.3% 5.4% 5.3% 5.6%
TOTAL ORE MINED (CALICHE) Mt 44 44 44 44 44 44 44 44 44 44 43 43 42 42 41 41 41 40 773
Iodine (I2) in situ kt 19.3 19.1 19.5 18.6 18.9 18.1 19.0 17.9 18.0 18.3 18.1 17.9 17.8 17.4 17.5 17.3 16.8 16.9 326.4
Yield process to produce prilled Iodine % 55.6% 54.6% 53.0% 55.8% 59.9% 54.7% 55.2% 59.9% 59.2% 55.8% 55.2% 55.4% 56.0% 56.2% 56.9% 56.9% 57.2% 58.4% 56.4%
Prilled Iodine produced kt 10.7 10.1 10.6 11.1 10.3 10.0 11.3 10.8 10.1 10.1 10.1 10.0 10.0 9.9 9.9 9.9 9.8 9.8 184.6
Nitrate Salts in situ kt 2,586 2,344 2,398 2,261 2,343 2,228 2,422 2,097 2,377 2,331 2,306 2,286 2,260 2,241 2,212 2,188 2,174 2,143 41,198
Yield process to produce Nitrates % 43.4% 46.9% 48.2% 58.2% 59.0% 59.0% 57.8% 58.2% 58.0% 59.8% 60.9% 61.1% 62.2% 63.0% 64.2% 65.2% 65.9% 67.3% 58.7%
Nitrate production from Leaching kt 1,122 1,070 1,162 1,312 1,387 1,317 1,324 1,278 1,395 1,349 1,333 1,398 1,405 1,412 1,419 1,427 1,434 1,442 23,985
Ponds Yield to produce Nitrates Salts % 54.2% 60.7% 68.5% 64.3% 65.9% 64.7% 66.3% 63.5% 63.5% 63.5% 63.5% 63.5% 63.5% 63.5% 63.5% 63.5% 63.5% 63.5% 63.6%
Nitrate Salts for Fertilizers kt 608 649 796 843 914 852 878 812 886 857 847 888 893 897 902 906 911 916 15,256

 

SQM TRS Nueva Victoria Pag. 149

 

 

 

 

Grade dilution from mining is estimated to be less than 2.5% (± 10 ppm iodine) and less than 2.3% for nitrate (± 0.12% nitrate). During the caliche mining process, as the mineralized thicknesses are low (≤ 5.0 m), there is a double effect on the mineralized mantle floor resulting from the blasting process: with the inclusion of underlying material as well as over-excavation. These tend to compensate, with dilution or loss of grade is minor or negligible (± 10 ppm for Iodine).

 

The excavation depth is controlled by GPS on the loading equipment. SQM considers a planned mining recovery of 90%, (average value for MP 2023-2040).

 

The processes of extraction, loading and transport of the mineral (caliche) include:

 

Surface layer and overburden removal (between 0.5 to 1.0 m thick) that is deposited in nearby mined out or barren sectors. This material is used to build the base of the heap leaching structures.

 

Caliche extraction, to a maximum depth of 6 m, using explosives (drill and blast), or surface excavator (CM type Terrain Leveler SEM).

 

Blasting is performed to achieve good fragmentation, good floor control, ore sizes suitable for the loading equipment, and to avoid further handling (20% of fragments below 5.0-6.0 cm, 80% of fragments below 37.0 cm, and maximum diameter of 100 cm).

 

CMs are used to mine areas that are close to infrastructure that can be damaged by blasting, to extract softer caliche areas and to obtain a more homogenous granulometry of mineral extracted, which generates better recovery rates in the iodine and nitrate leaching processes. In addition, it generates less dust emission than drill and blast. The decision to use a miner versus drill & blast is based on simple compressive strength parameters of the rock (up to 35 megapascals [MPa]), to limit material abrasiveness, as well as the presence of caliche clasts.

 

This equipment allows mineral fragmentation through the rotation of the cutting drum with iron tips reinforced with tungsten alloy, which crushes the mineral to obtain an average and homogeneous size of approximately 15.0 cm (20% below 3.5 cm, 80% below 15.0 cm and Dmax 45.0 cm, as average values). The drum is located at the back of the machine, which enables the cutting of mineral while the crawler tracks remain on the ground so as not to damage the crushed material.

 

The 2023 Mining Plan targets an annual production of 44 Mt of fresh caliche (5.9 % NaNO3, 440 ppm Iodine and 56.6 % soluble salts) of which 34 Mt will be extracted by traditional mining and 10 Mt by continuous mining. However, the objective is to progressively increase continuous mining to reach a production 15 Mt in 2024 and the remaining 32 Mt by drill and blast.

 

SQM TRS Nueva Victoria Pag. 150

 

 

 

 

Caliche loading, using front-end loaders and/or shovels.

 

Transport of the mineral to heap leach pads, using mining trucks (rigid hopper, 100 t to 150 t).

 

Heap leach pads (Figure 13-3) are built to accumulate a total of 1 Mt, with heights between 7 to 15 m and crown area of 65,000 m2 .

 

Figure 13-3. Pad Construction and Morphology in Nueva Victoria Mine (caliches)

 

 

 

Physical stability analysis performed by SQM reports that these heaps are stable in the long term (closed heaps) and no slope modification is required for closure.

 

Fragmented material from continuous surface mining (21% of annual production and projected to reach 34% by 2024) comes to heaps separate from the ROM ones.

 

There are several stages in the heap construction process:

 

Site preparation and construction of the heap base and perimeter parapets to facilitate collection of the enriched solutions.

 

The base of the heaps has an area of 84,000 m² and a maximum cross slope of 2.5% to facilitate the drainage of solutions enriched in iodine and nitrate salts.

 

Heap base construction material (0.4 m thick) comes from the sterile material and is roller-compacted to 95% of normal proctor (moisture and/or density is not tested on site).

 

An HDPE, waterproof geomembrane is laid on top of this base layer.

 

To protect the geomembrane, a 0.5 m thick layer of barren material is placed on top (to avoid damage to the membrane by ROM/CM fragments stored in the heap).

 

SQM TRS Nueva Victoria Pag. 151

 

 

 

 

Heap pad loading by high-tonnage trucks (100 to 150 t). The leach pads are built in two lifts each 3.25 m high, on average. The average high of a heap pad is 6.5 m.

 

Impregnation, which consists of an initial wetting of the heap with industrial water, in alternating cycles of irrigation and rest, for a period of 60 days. During this stage the pile begins its initial solution drainage (brine)

 

Continuous irrigation until leaching cycle is completed in the following stages:

 

Irrigation Intermediate Brine: stage where first pass solutions are cycled through the oldest half of heaps to add an additional charge. It lasts up to 280 days.

 

Mixing: Irrigation stage consisting of a mixture of recirculated Brine Feble5 and water. Drainage from these heaps is considered as SI and are used to irrigate other heaps. This stage lasts about 60-80 days.

 

Washing: last stage of a heap's life, with a final irrigation of water, for approximately 20-30 days.

 

In total, there is a cycle of approximately 300 to 500 days for each heap, during which time the heap drops in height by 15-20%.

 

The irrigation system used is a mixed system with drippers and sprinklers. In the case of drippers, heaps may be covered with a plastic sheet or blanket to reduce evaporation losses and improve the efficiency of the irrigation system.

 

Leaching solutions are collected by gravity via channels, which lead the liquids to a sump where it is recirculated by means of a portable pump and pipes to the brine reception and accumulation ponds.

 

Once the heaps are out of operation, tailings can either be used for base construction of other heaps or remain on site as exhausted heaps.

 

In 2022, for the heap leaching processes, the total water demand was 616.2 L/s (2,069 m³/h) (unit consumption of 0.386 m³/ton caliche leached), while enriched solution flow from heap leach to Nueva Victoria-Iris concentration plants was 2,224 m³/h. In the process SQM applies a recirculation system for leaching to achieve a higher brine production than fresh water used. The hydraulic efficiency of the heap leaching process in NV mine reached an average of 80%.

 

In the Long term (MP) for 2023-2040 period, the unit water consumptions range from 0.44 to 0.54 m³/ton of caliche leached with an average of 0.52m³/ton. The leaching process projected for 2023-2040 envisions an increase of water used (pumped groundwater and seawater) from 582 L/s in 2023 to 668 L/s in 2030. This increased water use in the leaching process results in an improvement in the extraction of Iodine and Nitrates in the heap leach structures, allowing a better performance in the metallurgical recovery process.

 

SQM TRS Nueva Victoria Pag. 152

 

 

 

 

Leaching process yields average 58.0% for iodine and 57.2% for nitrate in ROM heap leaching (drill and blast material) for the Long Term from 2023 to 2040 period.

 

Homogeneous and smaller fragmentation generated by the CM allows an increase of 6% in Nitrate yield (approximately to 62.9% recovery) and 12% in Iodine yield (approximately to 70.0% recovery).

 

Heap leaching process performance constraints include the amount of water available, slope shaping7 (slopes cannot be irrigated), re-impregnation and resource/reserve modelling errors. This last factor most influences annual target production deviations from actuals achieved. Such deviations are typically as high as -5% for iodine and -10% for nitrate.

 

Other facilities besides heaps are solution ponds (brine, blending, intermediate solution) and water and back-up ponds (brine and intermediate solution). There are about seven rectangular ponds with 8,000 m³ to 36,000 m³ capacity and heights between 3.0 to 4.9 m, which have pump systems, whose function is to drive industrial water, Brine Feble (BF), and Intermediate Brine to the heap leaching, through HDPE pipes, to extract the maximum amount of iodine and nitrate from the caliche heaps (continuous irrigation process).

 

From brine ponds, the enriched solutions are sent to the iodide plants via HPDE pipes.

 

7 Heap morphology implies a natural slope of 24º (1H:0.44V).

 

Production and Final Mine Outline

 

SQM works with topographic control in the mining operations whereby the soil and overburden are removed (total thickness of 1.5 m on average at Nueva Victoria) and caliche is extracted (average thickness of 3.0 m).

 

Given that the excavations are small (4.70 m on average) in relation to the surface area involved (655 ha/y), it is not possible to correctly visualize a topographic map showing the final situation of the mine.

 

Figure 13-4 depicts the final mine outline for the 2023 to 2040 period (Long Term Plan).

 

SQM TRS Nueva Victoria Pag. 153

 

 

 

Figure 13-4. Final Mine Outline - Nueva Victoria Mining Plan 2023-2040

 

 

 

SQM TRS Nueva Victoria Pag. 154

 

 

 

 

Caliche production data for the 2023-2040 Long Term (MP) involves a total production of 773 Mt, with average grades of 422 ppm of Iodine and 5.3 % of Nitrates.

 

The total of volume of brine leach solution to produce expected is around 659.4 Mm³ (Mining Plan 2023-2040).

 

Based on production factors set in mining and leaching processes, a total production of 184.8 kt of Iodine and 24,092 kt of Nitrate salts is expected for this period (2023-2040), which means to produce fresh brine solution (49.492 m³/d) with average contents of 29 tpd of Iodine (0.64 g/L) and 3,625 tpd of Nitrate salts (112.7 g/l) that would be sent to the processing plants. Note that dilution factors considered herein are in addition to the indicated resource to probable reserve factors described above.

 

Table 13-4. Mine and Pad Leaching Production for Nueva Victoria Mine Period 2023 – 2040.

 

LOM 2023- 2040 Caliches % / Ratios Iodine Nitrate
Production (kt) 772.5      
Average grades (iodine ppm / Nitrate %)     422 5.3
In-situ estimates (kt)     326.4 41,198
Traditional Mining (kt) 546.5 70.74%    
Continuous Mining (kt) 226 29.26%    
Mining Yield   92.31%    
Grade Dilution Factor     2.25% 2.50%
Grade dilution       9.51 0.13
mining process efficiency     90% 90%
Mineral Charged in Heap Leach (kt)     326.4 41,198
Heap Leach ROM recovery from Traditional mining (a)     58% 57%
Heap  ROM production from Traditional mining  Heaps (kt)     230.9 29,145
Heap Leach recovery from continuous mining     69% 62%
Heap production ROM continuous mining (kt)     95.5 12,053
Total Heap Leach production (kt)     184.6 23,985
Total Heap Leach production (tpd)     30 3,863
Total Heap Leach production (ktpy)     10.9 1,410
Heap Leaching recovery coefficient     61% 58%
Recovery Average Coefficient for Iodine complete process     56.8% 37%
Total Industrial plant processing NV - Iris (kt)     184.6 23,985

 

(a)Recovery from CM is higher than ROM ore material.

 

SQM TRS Nueva Victoria Pag. 155

 

 

 

 

Requirements for Stripping, Underground Development, and Backfilling

 

Initial ground preparation work requires an excavation of a surface layer of soil-type material (50 cm average thickness) and overburden or waste material above the mineral (caliche) that reaches average thicknesses of between 50 cm to 100 cm.

 

This is done by bulldozer type tracked tractors and Whelldozer type wheeled tractors. This waste material is deposited in nearby mined-out or barren sectors.

 

SQM has 8 bulldozer type tractors of 50 to 70 tons and 4 Whelldozer type tractors of 25 t to 35 t for these tasks.

 

Caliche mining is conducted through use of explosives and/or continuous miners to a maximum depth of 6 m (3.0 m average and 1.5 m minimum mineable thickness), with an annual caliche production rate at Nueva Victoria of 45 Mtpy.

 

Caliche extraction by drilling and blasting is executed by means of rectangular blasting patterns, which are drilled considering an average caliche thickness of 3.2 m.

 

Table 13-5 Blasting Pattern in Nueva Victoria Mine

 

Diameter (Inches) Burden (m) Spacing (m) Subgrade (m)
3.5 2.8 to 3.2 2.2 to 2.8 0.5 to 0.8
4.0 2.8 to 3.4 2.8 to 3.4 0.7 to 1.2
4.5 3.4 to 3.8 3.4 to 3.8 1.0 to 1.5

 

Usually, drilling grid used in Nueva Victoria is 2.8 x 3.0 m and 3.0 x 3.2 m, with a drill diameter of 4". Atlas Copco rigs (F9 and D7 equipment) are used for drilling (Percussion drilling with DTH hammer).

 

The explosive used is ANFO, which is composed of 94% ammonium nitrate and 6.0% fuel oil, which has a density of 0.82-0.84 g/cc, with a detonation velocity between 3,800 to 4,100 m/s. The charge is 24.3 kg per drill hole.

 

A backfill (stemming) of 0.80 m is provided with sterile material. For detonation, 150 g APD boosters and non-electric detonators are used as detonators, which start with a detonating cord. The over-excavation (subgrade) is variable from 0.5 to 1.5 m. Blasting assumes a rock density of 2.1 t/m³ of intact rock, with an explosives load factor of 365 g/ton (load factor of 0.767 kg/m³ of blasted caliche), for an extraction of 122,500 tpd of caliche. The figure 13-5 depicts a typical blast.

 

SQM TRS Nueva Victoria Pag. 156

 

 

 

 

Figure 13-5. Typical Blast in Nueva Victoria Mine (caliches)

 

 

 

SQM has two Vermeer T1655; series equipment with a rotating drum and crawler tracks. Each unit can produce 3 Mtpy. It also has SEM-Wirtgen 2500SM Series equipment (Figure 13-6), with a different cutting design to Vermeer equipment, with crawler tracks and able to work with a conveyor belt stacking or loading material directly to a truck.

 

Figure 13-6. Terrain Leveler and SME equipment (Vermeer)

 

    

 

The unit cost of mine production at Nueva Victoria based on traditional mining is set at 2.09 USD/ton, while for continuous mining it is 2.72 USD/ton.

 

The higher recovery rate in heap leaching which allows continuous mining fragmented material, smaller in diameter and better sorted, leads to a 16% reduction in iodine production costs at Nueva de Victoria's plant (13,560 USD/ton iodine produced for traditional mining method versus 11,750 USD/ton iodine for continuous mining method).

 

SQM TRS Nueva Victoria Pag. 157

 

 

 

 

Use of the continuous Wirtgen-type machinery implies a 2% cost saving compared to Vermeer type machinery for production of enriched solutions on heap leaching and an iodine production cost saving at the Nueva Victoria plant of 2%.

 

Required Mining Equipment Fleet and Personnel

 

This sub-section contains forward-looking information related to equipment selection for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecasts or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that were set forth in this sub-section including labor and equipment availability and productivity.

 

SQM has sufficient equipment at the Nueva Victoria mine to produce enough caliche as required, to mine and build heap leach pads, and to obtain enriched liquors that are sent to treatment plants to obtain Iodine and Nitrate end-products.

 

The equipment available to achieve Nueva Victoria's current production Mining Plan (2023-2040) of caliche is summarized in Table 13-6. The current equipment capacity has been evaluated by the QP and will meet the future production requirements.

 

Table 13-6 Equipment Fleet at Nueva Victoria mine

 

Equipment Quantity Type or size
Front Loader 5 12.5 and 15 m3
Shovels 2 13 to 15 m3  / 150 to 200 Ton
Surface Excavation Machine (SME) 2 100 to 200 Ton
Trucks 15 100 to 150 Ton
Bulldozer 4 50 to 70 Ton
Whelldozer 2 35 Ton
Drill 5 Top hammer of 3.5 to 4.5 inches (diameter)
Grade 3 5 -7 m
Roller 2 10 - 15 Ton
Excavator 3 Bucket capacity 1 -1.5 m3

 

The staff at Nueva Victoria's mining operation consists of 575 professionals dedicated to mining and heap leach operation.

 

Also, a total of 126 professionals are employed for heap leaching and ponds maintenance. No contractor mining and labor is used.

 

The Nueva Victoria mine operation includes some general service facilities for site personnel: offices, bathrooms, truck maintenance and washing shed, change rooms, canteens (fixed or mobile), warehouses, drinking water plant (reverse osmosis) and/or drinking water storage tank, sewage treatment plant and transformers.

 

SQM TRS Nueva Victoria Pag. 158

 

 

 

 

14Processing and Recovery Methods

 

This sub-section contains forward-looking information related to the nitrate and iodine concentrators, leaching and solvent extraction throughputs and designs, equipment characteristics, and specifications for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecasts or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that were set forth in this sub-section including actual ore feed characteristics that are different from the historical operations or from samples tested to date, equipment and operational performance that yield different results from the historical operations, historical and current test work results, and metallurgical recovery factors.

 

The Nueva Victoria Property includes caliche mining areas, heap leaching and processing plants to produce iodine as the primary product and nitrate as a secondary product. The mine facilities are concentrated in the following three SQM property areas: Nueva Victoria, Sur Viejo, and Iris.

 

Nueva Victoria ore contains an average of 5.3% nitrate and 422 ppm iodine as stated in the current TRS (section 12.2 Mineral Reserves). A portion of the iodine and nitrate is water-soluble and is extracted during heap leaching. Following iodide extraction, a portion of the iodide-depleted solution is fed back to the heap leaching process. The remaining iodide-depleted solution is piped to the evaporation ponds where nitrate salts are recovered from it.

 

Standard open pit mining methods are used to mine the caliche ore. Caliche mining occurs over an area of approximately 408.5 km² within the Nueva Victoria Property and 45.5 km² within the Iris Property. The nominal rate of caliche mining is currently 44 Mtpy. Once the environmental permitting of the TEA project is complete, the caliche mining rate will increase by a further 28 Mtpy. Pregnant Leach Solution (PLS) from the heap leach is piped to the iodide plant, Nueva Victoria, and iris, located about 20 km from the pile site, which have a production capacity of 11 ktpy and 2 ktpy of iodine, respectively.

 

The 2010 environmental permit for the Pampa Hermosa Project considered the installation of a Nitrate Plant to produce sodium nitrate & potassium nitrate at Nueva Victoria. This has not yet been implemented, and currently nitrate production for Nueva Victoria and Iris is carried out at the Coya Sur (Antofagasta Region).

 

Nueva Victoria operations currently have the following facilities:

 

Caliche mine and mine operation centers.

 

Nueva Victoria Iodide Plant and Nueva Victoria Iodine Plant.

 

Iodide - iodine Iris Plant.

 

Neutralization Plant.

 

Evaporation ponds.

 

SQM TRS Nueva Victoria Pag. 159

 

 

 

Waste salts deposit.

 

Industrial water supply.

 

Auxiliary installations: Camps and offices, domestic waste disposal site, hazardous waste yard, and non-hazardous industrial waste yard.

 

Figure 14-1 shows a block diagram of the main stages of caliche mineral processing to produce iodine prill and nitrate salts at Nueva Victoria. The following sections describe the operational stages and mineral processing facilities.

 

Figure 14-1. Simplified Nueva Victoria Process Flowsheet

 

 

 

SQM TRS Nueva Victoria Pag. 160

 

 

 

 

Process Overview

 

The Nueva Victoria Property includes caliche mining, heap leaching and processing plants to obtain iodine as the main product and nitrate as a by-product.

 

Figure 14-2 presents a schematic of the mineral production process of iodine and concentrated nitrate salts from caliche ore at Nueva Victoria. This diagram shows that the process can be summarized in six relevant stages: mining, leaching, extraction in iodide plant, conversion in iodine plant, neutralization, and evapo-concentration. Each of these stages are described below.

 

Figure 14-2. Schematic of the Mineral Production Process at Nueva Victoria

 

 

 

The extraction process begins with the removal of non-mineralized soil and non-mineralized overburden and ends with the loading and transport of the caliche to the leaching heaps. More details on this operation are described in Section 13.2

 

Two categories of ore, defined by SQM, are processed at the site. These include Ore Category 1 (ROM ore extracted by blasting), and Ore Category 2 (ore extracted by CMs).

 

The batter fragmentation of the CM ore results in a higher percentage recovery of the available mineral salts in the PLS generated. As of 2022, this material represents 20% of the mineral stacked on the heap leach pads. The relative proportion of this material added to the heap leach pads will increase sequentially over the long term.

 

SQM excavates caliche from the Nueva Victoria at a rate of 37 Mtpy in accordance with RE N°0515/2012 (Resolution Exempt, the government permit that authorizes the mineral extraction). At the neighboring Iris Property, SQM mines caliche and a rate of 6.48 Mtpy in accordance with permit RE 1447/2018. The authorized mining rate increased by an additional 28 Mtpy, reaching an authorized total of 65 Mtpy of mining at the Nueva Victoria Property. The caliche is extracted using explosives and then loaded and transferred to the heap leach pads. The caliche is leached using process water, augmented with depleted solution outflow from the iodide plant. This component of depleted (feeble) solution from the iodine process is referred to by SQM as BF that corresponds to weakly acidic water (also called agua feble ácida [AFA]).

 

SQM TRS Nueva Victoria Pag. 161

 

 

 

 

The Table 14-1 summarizes the changes considered by the expansion project.

 

Table 14-1 Modifications to the Operation with Expansion of the TEA Project

 

Installation Current Situation Modification Situation with TEA Project
Nueva Victoria surface area authorized for mining 408.5 km² Increase of 436 km² Total mineable area of 844.5 km² at Nueva Victoria (890 km² including Iris)
Iris surface area authorized for mining 45.5 km² No change No modification
Rate of caliche mining at Nueva Victoria 37 Mtpy Increase of 28 Mtpy Total mining rate 71.48 Mtpy (65 Mtpy of which is at Nueva Victoria)
Rate of caliche mining at Iris 6.48 Mtpy No modification No modification
Iodide production, Nueva Victoria 11 Ktpy Increase of 12 Ktpy Total iodide production rate 25 Ktpy
Iodide production, Iris 2 Ktpy No modification  
Iodine production, Nueva Victoria 11 Ktpy Increase of 12 Ktpy Total rate of iodine production 23 Ktpy
Iodine production, Iris 2 Ktpy No modification  
Salt production 1,025 Mtpy (2,050 Mtpy with Pampa Hermosa) Increase of 1.95 Mtpy Total production rate of nitrate-rich salts 4 Mtpy
Evaporation ponds 8.34 km² Increase of 10.17 km² Total evaporation ponds area 18.51 km²
Water use 810.8 L/s (groundwater abstraction for industrial use) Increase of 900 L/s (abstraction of seawater) Total permitted water uses 1,710.8 L/s for industrial use

 

The operations carried out to treat the ore and obtain iodine and nitrate salts are described below.

 

SQM TRS Nueva Victoria Pag. 162

 

 

 

 

14.1.1Mine Area and COM (Operation Centers)

 

The SQM Nueva Victoria and Iris Properties cover areas of approximately 408.5 km² (Nueva Victoria West, North, and South) and 44.5 km² (Iris). Administratively, SQM distinguishes:

 

The mining areas (mineral deposit areas).

 

The office and support buildings, warehouses, truck repair shops, heap leach piles, industrial water, and leaching solution (brine) storage ponds.

 

SQM refers to the processing plant and office area at Nueva Victoria and Iris as the Nueva Victoria Mine Operations Center (Centro de Operaciones Mina, or COM) and the Iris COM respectively.

 

Inside the mine areas there are the COM whose objective is the management of the different solutions. Basically, a COM is formed by the leaching heaps and accumulation ponds for the brine coming from the leaching process and the water required for the same. Thus, both COM de Nueva Victoria and Iris are facilities that have brine accumulation ponds, reception and accumulation ponds for AFA, industrial water ponds, and intermediate solution, which correspond to irrigation solutions.

 

All brine, industrial water and BF accumulation ponds are lined with impermeable membranes (typically HDPE or PVC) to prevent infiltration of their contents into the underlying ground.

 

14.1.2Heap Leaching

 

Leach piles are constructed on non-mineralized ground, so as not to cover valuable caliche resource. The land is prepared prior to construction of the heap leach pads. The soil is left with a slope profile of 1 to 4%, to promote gravity flow of the PLS. The base is covered with an impermeable geomembrane (PVC, or HDPE) to prevent seepage of leaching solutions into the ground, allowing the solutions to be collected at the toe of the leach pile. A protective 40-50 cm thick layer of fine material (non-mineralized chusca (weathered material) or spent leached caliche) is spread over geomembrane to protect it against being damaged by the transit of mine vehicles or punctured by sharp stones.

 

The caliche to be leached is then emplaced over the protective layer. The leach piles are constructed with a rectangular base and heights between 7 to 15 m and a crown area of 65,000 m². Once the stacking of caliche is complete, the pile is irrigated to dissolve the soluble mineral salts present in the caliche.

 

The heap leaching operation applies alternating cycles of irrigation and resting. The irrigation system used incorporates both sprinklers and drip irrigation. The heap leaching process typically takes around 425 days from start to finish (in general, the operating range is of approximately 300- 500 days for each heap). Over the leaching cycle, the removal of soluble mineral salts results in a 15% to 20% drop in height of each leach pile.

 

SQM TRS Nueva Victoria Pag. 163

 

 

 

 

Figure 14-3 presents a schematic of the heap leaching process. The piles are organized in such a way as to reuse the solutions they deliver production piles (the newest ones), which produce rich solution to be sent to the iodine plant, and older piles whose drainage feeds the production piles. At the end of its irrigation cycle, an (old) pile leaves the system as inert debris, and a new pile enters at the other end, thus forming a continuous process.

 

Figure 14-3. Schematic of the Heap Leaching Process at Nueva Victoria

 

Diagrama

Descripción generada con confianza muy alta

 

The stages in the heap leaching process (Figure 14-3) are as follows:

 

1)Initial irrigation of the heap with industrial water (impregnation): the “impregnation” stage corresponds to the initial irrigation of the leach pile with industrial water. During this stage the pile begins generating salt-bearing leach solution at its base, termed brine. Stage 1 lasts about 50-70 days.

 

2)Irrigation of the heap with Intermediate Solution: Maturing heap leach piles are irrigated with drained solutions. This stage lasts about 190-280 days.

 

3)Mixed: the heap is irrigated with a mixture of recirculated AFA and referred to by SQM as BF and industrial water. The leaching solutions draining from these heaps are termed Intermediate Solution (SI). The SI is the input to Stage 3 of the heap leaching cycle. This stage lasts about 60-80 days approximately.

 

4)Washing of the heap: this is the last stage of a heap's life, comprising a final water irrigation of the heap with industrial water to maximize total extraction of soluble salts. This stage lasts about 20-30 days.

 

SQM TRS Nueva Victoria Pag. 164

 

 

 

 

The PLS obtained during heap leaching process is referred to as brine by the operation. The leaching solutions (brines) which drain from the leaching piles are piped, according to their hydrochemistry to poor solution, intermediate solution, and rich solution brine storage ponds (accumulation ponds) at the COM. From here they are piped to the Nueva Victoria and Iris process plants.

 

The mining waste generated at the site corresponds to spent leached material, overburden, and non-target mineral salts. These discarded mineral salts form an inert, cohesive, and highly cemented material that are emplaced as dump piles adjacent to the evaporation ponds.

 

As part of ongoing efforts to reduce the use of continental groundwaters, SQM is currently evaluating:

 

The integration of seawater into the industrial water feed.

 

The reduction of evaporative water loss from leach piles by relying increasingly on drip irrigation rather than spray irrigation and covering the surface of leach piles which are undergoing irrigation with impermeable membranes.

 

The reduction of evaporative water loss from industrial water, brine, and BF accumulation ponds by covering the surface of these ponds with floating HDPE spheres.

 

14.1.3Iodide-Iodine Production

 

The facilities are in three sectors corresponding to: Nueva Victoria, Sur Viejo, and Iris. The iodide and iodine production plants are located at Nueva Victoria.

 

The iodide plant is connected to the Nueva Victoria COM via a 20 km long pipeline. It converts the iodate, recovered from the caliche by the heap leaching process, into iodide. The segregation of the brines into poor, intermediate and rich in the accumulation ponds at the Nueva Victoria and Iris sites allows SQM to ensure an optimum concentration of iodate (in the range 0.5 – 1.0 g/L iodate) in the brine feedline to the iodide plant.

 

The iodide-rich solution output by the iodide plant is then fed into the iodine plant which produces Iodine pearls (prill) of iodine whose luster gives them a metallic appearance.

 

The other output from the iodide plant is leaching solution depleted in iodide, which SQM often refers to as BF, or AFA. The BF produced at the iodide plant can be routed via two alternative paths:

 

It can be recirculated to the heap leach operation.

 

It can be sent to the neutralization plant, where, by adding lime or sodium carbonate, neutral BF (brine feble neutral [BFN, AFN]) is produced. BFN is discharged to the solar evaporation ponds at Viejo Sur where nitrate-rich salts are produced and sent for processing to the nitrate production plant at the SQM Coya Sur facility, located 160 km to the south of Nueva Victoria, and 7 km southeast of the town of María Elena in the Antofagasta Region of northern Chile.

 

SQM TRS Nueva Victoria Pag. 165

 

 

 

 

At Iris and Nueva Victoria service plants, this process is intended to reduce sodium iodate from caliche leach solutions to free iodine by addition of sulfur dioxide, and then to separate and purify it. The required sulfur dioxide is produced by burning sulfur. There are two stages in the process of obtaining free iodine: production of iodide from iodate (iodide plant) and production of iodine from iodide (iodine plant). The iodine and iodine derivatives production facilities have qualified in accordance with ISO-9001:2015 program for which TÜV Rheinland provides quality management system certification.

 

Below is a description of iodate to iodine transformation processes that are performed at Nueva Victoria and Iris service plants.

 

14.1.3.1Nueva Victoria Iodine Production

 

The Nueva Victoria Iodine Processing Plant is situated 1 km southeast of the access control (garita) to the SQM Nueva Victoria complex. It covers an area of approximately 15 ha. It includes:

 

3 Iodate to iodide modules.

 

3 Iodide to iodine modules.

 

A sulfur dioxide (SO2) generating plant.

 

Leaching solutions (brines) from the heap leaching of caliche ores are piped to the brine reception pond of each iodate to iodide module. This brine has an iodate content between a minimum of 0.4 g/L and an ideal working concentration of 0.7 g/L iodine equivalent.

 

Figure 14-4 presents a schematic of the iodine recovery process.

 

Figure 14-4. Schematic of the Iodine Recovery Process at Nueva Victoria

 

Diagrama

Descripción generada con confianza muy alta

 

SQM TRS Nueva Victoria Pag. 166

 

 

 

The first stage of the process occurs at the iodide plant. Here, the iodate in the brine entering the iodide plant from the heap leach is chemically reduced to iodide with sulfur dioxide. Most of the iodide produced by this process is in the form of sodium iodide. Sulfuric acid is added to acidify the iodide solution, then fresh brine is mixed into it. Due to the acidic conditions, iodate (IO3) and iodide (I ) in the solution react to precipitate solid iodine (I2 ) as described by the following equation:

 

5I (aq)+IO3(aq)+6H +(aq)→3I2 (s)+3H2 O (l)

 

Three moles of iodine are produced for every mole of iodate ion consumed in the reaction. This process of producing iodine by reacting iodate and iodide in acidic solution is referred to as “cutting”. The brine now comprises an aqueous solution of iodide and iodate with iodine in suspension. It is routed to a mixer-settler which separates out the solid iodine. The aqueous solution of iodide and iodate is then processed with solvent extraction (SX), using kerosene as the solvent, to recover iodide from it. Nueva Victoria has three such SX plants (SX1, SX2, and SX3).

 

The outputs from the SX plant are:

 

Iodide pulp.

 

Iodine-depleted acidic solution, referred to by SQM as AFA.

 

The kerosene solvent is recirculated to the start of the SX process.

 

The AFA is neutralized with sodium hydroxide to give BFN, part of which is recycled to the heap leaching process, with the rest routed to the evaporation ponds at Sur Viejo for the recovery of salts rich in potassium and sodium nitrate, which are trucked to the SQM Property at Coya Sur for refining.

 

The iodide pulp produced by the SX plants is refined in a 2-stage process. First it is filtered, then it is passed through an activated carbon column tower to remove any residual kerosene solvent.

 

The iodide pulp is then routed through to the next stage of the process at the iodine plant where it is oxidized, using hydrogen peroxide and chlorine as the oxidizing agents. The iodine pulp thus obtained is then smelted and subsequently prilled to produce fine pellets of iodine called “prill” which have a metallic luster.

 

Figure 14-5 presents the general layout of the iodide and iodine plant complex at Nueva Victoria, including the additional capacity which will be required once the environmental permit for the TEA expansion has been obtained.

 

SQM TRS Nueva Victoria Pag. 167

 

 

 

 

Figure 14-5. General Arrangement Drawing. Iodide-Iodine Plants of Nueva Victoria

 

 

SQM TRS Nueva Victoria Pag. 168

 

 

 

 

14.1.3.2Iris Iodide-Iodine Production

 

The Iris plant has an iodide-iodine plant within its COM. The iodine production facilities are currently inoperative and so the iodide brines are used to feed the iodine plants at Nueva Victoria. Figure 14-6 presents a schematic of the production process at Iris Plant

 

Figure 14-6. Process Diagram of Iris Plant

 

Diagrama

Descripción generada con confianza muy alta

 

The Iris Plant can process brines with iodate concentrations as low as 0.02 g/L iodine equivalent.

 

The iodide produced in the absorption towers is routed to the cutting pond, where it is mixed with iodate-bearing fresh brine from the fresh brine storage pond at the plant. The iodate and iodide in the solution react to precipitate solid iodine.

 

The iodine-enriched solution from the cutter is pumped to the blow-out tower (blowing tower), where it is counter-flowed with air. This generates a liquid iodine suspension in air, which is routed to the iodine adsorption-desorption tower. There, applying a counterflow of iodide solution, dismutase solution of iodide and iodate, which is stable. The design of the adsorption-desorption tower maximizes contact time between the reagents.

 

This solution is routed to the iodide recirculation pond, creating a concentration cycle. From the recirculation ponds, the iodide-enriched brine is sent for refining at the Nueva Victoria iodine plant.

 

SQM TRS Nueva Victoria Pag. 169

 

 

 

14.1.4Neutralization Plant

 

The neutralization plant at Nueva Victoria covers a surface area of approximately 59.76 ha. It includes AFA storage ponds, solids sedimentation ponds, neutralization ponds, industrial water ponds, reagent storage warehouses, pumping infrastructure and support facilities. The Neutralization Plant receives AFA outflow from the iodide plants. The AFA is mixed with a lime (calcium hydroxide) slurry to neutralize it in the neutralization ponds.

 

14.1.5Solar Evaporation Ponds

 

The evaporation ponds (referred to by SQM as pozas), and associated transfer pumps, are located at Sur Viejo (Figure 14-7). There are 6 stages in the Evapo-concentration process. The ponds are of different types that vary in size given their function. The Sur Viejo evaporation ponds have a depth of 3.2 m and an approximate surface area of 3,200,000 m2 – 3,400,000 m2. The pond configurations (pond types) used are detailed in Table 14-2. Averaged over the sequence of pond types, the mean annual rate of evaporation is approximately 5 L/m²/d (5 mm/d or 1,825 mm/y).

 

Table 14-2 Solar Evaporation Pond Types at Sur Viejo

 

Pond Type Description
Stage 1 Pond AFA Alkalinization Pond
Stage 2 Pond Brine Preconcentration, Phase 1 Pond
Stage 3 Pond Brine Preconcentration, Phase 2 Pond
Stage 4 Pond Cut-off or Boundary Pond
Stage 5 Pond High Grade Nitrate Pond

 

The 6-stage evaporation sequence is designed to progressively concentrate the evaporating brine. As this process progresses, the highly soluble nitrates (KNO3 and NaNO3) become ever more concentrated in the brine as impurities such as halite and Astrakanita progressively precipitate out from the ever-concentrating brine. Each of the 6 stages in the evapo-concentration process are described below.

 

Stage 1: AFA Alkalinization

 

Stage 1 corresponds to the AFA alkalinization (AFA neutralization) stage. Stage 1 infrastructure includes a neutralization plan, a quicklime (calcium oxide, CaO) storage silo, a slaking system to produce slaked lime (calcium hydroxide, CaOH2) and a reactor with agitator to mix the slaked lime slurry into the AFA. The slaked lime-AFA mixture (Stage 1 brine) is discharged into the Stage 1 pond. The main objective of this stage is to increase the pH of the brine from the pH 1.6 - 2.0 of the AFA to the pH 5.4 – 6.0 of the Stage 1 brine.

 

The rate of quicklime consumption (kg/m³ of AFA) varies between 0.30 and 0.60 kg/m3, depending on the acidity of the influent AFA. The Stage 1 brine can also be referred to as BFN, or Feble Neutral Water (FNW).

 

SQM TRS Nueva Victoria Pag. 170

 

 

 

 

Stages 2 & 3: Brine Preconcentration Ponds

 

The brine passes through the 125,000 m² Stage 2 and 250,000 m² Stage 3 evaporation ponds in sequence. The objective of this process is to Evapo-concentration the AFN towards saturation with KNO3 and NaNO3, progressively precipitating out impurities, principally halite (NaCl) and Astrakanita (Na2Mg(SO4)2·4H2O) crystals.

 

Stage 4: Cut-off or Boundary Pond

 

Evapo-concentration continues during Stage 4, progressively concentrating KNO3 and NaNO3 toward saturation levels.

 

Stage 5: High Grade Nitrate Pond

 

KNO3 and NaNO3 crystallize out in the Stage 5 pond. The high-nitrate salts obtained include residual impurities, including NaCl, Astrakanita, KClO4, H3BO3, and MgSO4. The relative proportion of KNO3 and NaNO3 in the high-nitrate salts reflects their ratio in the AFA fed into Stage 1.

 

Stage 6: System Purge

 

This is the final stage of the process, the remaining free moisture in the high-nitrate salt from Stage 5 is evaporated off and the high-nitrate salt is stockpiled for trucking to the SQM Coya Sur facility for further refinement prior to sale.

 

The Nueva Victoria Mine evaporation ponds planned for the TEA Project can be seen in Figure 14-8 and the dimensions are shown in Table -14-3.

 

Table 14-3 Solar Evaporation Pond Types at TEA Project

 

Pond Type Description Length x Width (m x m) Surface Area ( m2) Surface Area (Ha)
Stage 1 Pond AFA Alkalinization Pond 500 x 320 160,000 16
Stage 2 Pond Brine Preconcentration, Phase 1 Pond 500 x 250 125,000 12.5
Stage 3 Pond Brine Preconcentration, Phase 2 Pond 500 x 500 250,000 25
Stage 4 Pond Cut-off or Boundary Pond 240 x 165 39,600 3.96
Stage 5 Pond High Grade Nitrate Pond 280 x 250 70,000 7

 

SQM TRS Nueva Victoria Pag. 171

 

 

 

Figure 14-7. General Arrangement of Sur Viejo Evaporation Ponds

 

 

 

SQM TRS Nueva Victoria Pag. 172

 

 

 

 

Figure 14-8. General Arrangement of TEA Evaporation Ponds

 

 

 

SQM TRS Nueva Victoria Pag. 173

 

 

 

 

14.1.6Sur Viejo Nitrate Plant (Planned)

  

The 2010 environmental permit (RCA 890/10), which constitutes the environmental approval for the Pampa Hermosa Project, contemplates the construction of a nitrate plant at the Sur Viejo, adjacent to the existing evaporation ponds. The nitrate plant has yet to be constructed and so the high-nitrate salt produced by the evaporation pond sequence at Sur Viejo is trucked to the SQM Coya Sur facility for refinement.

 

The production capacity of the Sur Viejo nitrate plant would be 1.2 Mtpy of refined NaNO3 & KNO3. It would cover an area of 8.2 ha. Of modular construction, it would comprise 4 modules, each with a 300 ktpy NaNO3 / KNO3 production capacity. The plant would receive high-nitrate brine from Stage 5 of the evaporation pond sequence, which would be routed through crystallizers, solid-liquid separators, thickeners, and centrifuges. The resulting commercial products would be sodium nitrate and wet potassium nitrate.

 

Production Specifications and Efficiencies

 

14.1.7Process criteria

 

Table 14-4 contains a summary of the main criteria for the Nueva Victoria processing circuit.

 

Table 14-4 Summary of process criteria. Mine site caliche heap leaching and productive iodine process.

 

Criteria
Mining Capacity and Grades
Caliche Mine Exploitation 8.5 to 20 Mtpy
Caliche Exploitation at Iris Mine 6.48 Mtpy
Exploitation of Future Proven Areas 28 Mtpy
Average Grades 6.7 % Nitrate ; 408 ppm Iodine
Cut-off Grade Nitrate 3.0% - Iodine 300 ppm
Availability / Use of Availability
Mining Exploitation Factor 80 - 90 %
Plant Availability Factors 85%
Caliche Iodine PO Factor 3.7 Mt Caliche per Ton of Prilled Iodine
Caliche Nitrate PO Factor 21 Tonnes Caliche / Nitrate
Caliche Iodine Iris Factor  
Heap Leaching
Impregnation Stage 300 to 500 Days for Each Heap
Intermediate Solution
Mixed Irrigation Stage
Washing Stage with Industrial Water

 

SQM TRS Nueva Victoria Pag. 174

 

 

 

 

Criteria
Heap Leaching
Water + AFA Mixed Irrigation 40% Dilution of AFA
Heap Drainage 10 Days
Iodate Brine Turbidity  
Yield and Plant Capacity
Iodate / Iodide Yield 92 - 95%
Iodide / Iodide Yield 92%
Production Capacity at Nueva Victoria 11 Ktpy Iodide at Nueva Victoria
Production Capacity at Iris 2 Ktpy Iodide at Iris
Iodine Prill Product Purity 99,8%
High - Nitrate Salts Production Capacity 2.050 Mtpy

 

The following sections summarize the Nueva Victoria productivity and forecast.

 

14.1.8Solar Pond Specifications

 

The specific criteria for the operation of evaporation ponds are summarize in the 14-5:

 

Table 14-5 Description of Inflows and Outflows of the Solar Evaporation System

 

System Input Flows Unit Value
AFA Feed Flow m3 / h 1,200
Sodium Nitrate (NaNO3) g/l 127
Potassium (K) 12.5
Potassium Perchlorate (KClO4) 1.2
Magnesium (Mg) 15
Boron w/boric acid (H3BO3) 4.0
System outflows Unit Value
Discard Salts Ton 3,900,000
Astrakanite % 25
Sodium Chloride % 75
High Nitrate Salt Production Ton 2,050,000
Sodium Nitrate (NaNO3) 1,050,000
Sodium Nitrate (NaNO3) % 41.9
Potassium Nitrate (KNO3) 11.4
Potassium Perchlorate (KClO4) 0.32
Magnesium (Mg) 1.3
Boron w/boric acid (H3BO3) 2.4

 

SQM TRS Nueva Victoria Pag. 175

 

  

 

 

14.1.9Production Balance and Yields

  

Since 2014, SQM has been working on a plan to develop new caliche mining areas at Nueva Victoria and increase production of both nitrates and iodine at Nueva Victoria. With respect to the Iris Property, no modifications to the operation are contemplated. In recent years, investments have been made to increase the water supply capacity at the Nueva Victoria operations and to expand the capacity of the solar evaporation ponds and implement new mining and solution collection areas through expansion projects submitted to the National Environmental Commission. These projects are the Pampa Hermosa project (approved in 2010) and the TEA project, currently in process. The approval of Pampa Hermosa allowed increasing the nominal production capacity of the Nueva Victoria Operations to 11 ktpy iodine and to produce up to 1.2 Mtpy of nitrates and use new water rights of up to 665.7 L/s. This increase in capacity was achieved by adding new iodide production modules and new support facilities over an area of 34.9 hectares at the Nueva Victoria COM.

 

Nueva Victoria (including the Iris Operation) currently has a total production capacity of 13 ktpy of iodine, which affords SQM the flexibility to adjust production according to market conditions (iodine price). In 2019, 42,196 Mt of caliche, with a mean iodine grade of 465 ppm iodine, were processed, from which 10.70 kt of prilled iodine was produced. For the year 2022, the mean iodine grade of mined caliche was slightly lower at 430 ppm iodine and the 45.4 Mt of caliche processed yielded 12.4 kt of prilled iodine (10.8 kt from Nueva Victoria and 1.6 kt from PV).

 

Table 14-6 presents a summary of 2022 iodine and nitrate production at Nueva Victoria, including Iris.

 

Table 14-6 Summary of 2022 Iodine and Nitrate at Nueva Victoria, Including Iris

 

Iodine Balance NV Unit Total Year 2022
Caliche Processed Mt 45.4
Caliche Nitrate Grade % 6.0%
Caliche Iodine Grade ppm 430
Iodine Heap Yield % 55%
Brine sent to plant m3 17,803,215
Concentration gpl 0.57
Iodide Produce Kt 9,639
Iodine Plant Yield % 97.0%
Iodine Produced Kt 12,400
Iodide Plant Yield % 92%
Iodide Global Yield % 55%
Iris Iodine Production Unit Total Year 2022
Iodate Rich Brine Feed to Iodide Plant m3 1,021
Iodide to Nueva Victoria Iodine Plant Kt 1,172
Iodide Plant Yield % 92%
Average Yield of Prilled Iodine from Iris Iodide 97%
Global Iodine Yield Iris 87%
Iodine Produced Kt 1,348
Nitrate Balance NV Unit Total Year 2022
AFA Sent to Sur Viejo Evaporation Ponds Mm3 9,663,961
Nitrate in AFA Sent to Sur Viejo Evaporation Ponds Ton  NaNO3 1,009,873
Nitrate Concentration in AFA Sent to Sur Viejo Evaporation Ponds g/l (ppt) 106
NaNO3 Grade % 53%
Yield of NaNO3 from Sur Viejo Evaporation Ponds 71%

 

Table 14-7 shows the production data for 2022, 2021, 2020 and 2019:

 

SQM TRS Nueva Victoria Pag. 176

 

 

 

 

Table 14-7 Nueva Victoria Production Data for 2019 to 2022.

  

Nueva Victoria (Including Iris) 2022 2021 2020 2019
Mass of Caliche Ore Mined (Mt) 45,400 41,428 43,420 42,196
Iodine Grade in Caliche Ore (ppm) 430 441 452 465
Mass of Iodine Produced (Kt) 12.4 8.7 10.6 10.7

 

14.2.4 Production Estimation

 

In recent years, investments have also been made to increase water supply capacity at Nueva Victoria operations from two water sources approved by the Pampa Hermosa Environmental Study and to expand solar evaporation pond capacity and implement new mining and solution collection areas.

 

Due to Pampa Hermosa project, to increase nitrate production, Sur Viejo Industrial Area will have to be incorporated. In this sector, solar evaporation ponds will be expanded and there will be 2 types of ponds:

 

Pre-concentration ponds: Four pits (500 x 250 m, depth 3.2 m) and 13 ponds (500 x 250 m, depth 2.2 m), and a total volume of 5,175,000 m3.

 

Production ponds: Area 1,645,000 m2; 3,290,000 m3, 47 Ponds (140 x 250 m, depth of 2 m), and a total volume of 3,290,000 m3.

 

Furthermore, two additional neutralization plants will be built in addition to those already existing; a nitrate production plant will be built (with a capacity of 1.2 Mtpy of sodium nitrate and/or potassium nitrate) and new salt storage areas will be set up (final product, nitrate-rich salts, discarded salts and neutralization process residue). These facilities will involve a total surface area of 1,328 ha.

 

In terms of future, Nueva Victoria, and Iris' mining (see Section 13.2, see Table 13-3) and industrial plan, an economic analysis of which is discussed later in Chapter 19 (see Table 19-1) considers caliche extraction at a current rate of 44 Mtpy and estimates an increase in iodine and nitrate production to the year 2030. Projected growth is sequential and is expected to reach 10.1-11.3 ktpy of iodine production by 2029 - 2030.

 

Table 14-8 shows that to achieve the committed production it is required to increase water consumption to 0.52 m3/ton for the years 2028-2040 and the heap leach yield for iodine must be increased to 70.3%.

 

The indicated yield values for each year have been calculated using empirical yield ratios as a function of soluble salt content, nitrate grade and unit consumption.

 

SQM TRS Nueva Victoria Pag. 177

 

 

 

 

Table 14-8 Nueva Victoria Process Plant Production Summary.

  

Parameter 2023 2024 2025 2026 2027 2028 2029 2030 2031 Long Term
2032 -2040
Average Total
Mass of Caliche ore Processed (Mt) 44 44 44 44 44 44 44 44 44 377 42.9 773
Water Consumption (m3 / Ton Caliche) 0.41 0.40 0.42 0.48 0.48 0.48 0.48 0.48 0.48 0.50 0.48  
Ore Grade (ppm, I2) 440.5 430.7 432.1 421.1 428.4 413.3 430.1 413.8 409.5 419.6 422.1  
Ore Grade (Nitrate, %) 5.80% 5.18% 5.48% 5.13% 5.34% 5.08% 5.21% 4.99% 5.47% 5.30% 5.30%  
Soluble Salts, % 56.8% 62.4% 60.1% 59.5% 65.2% 63.5% 59.5% 59.4% 62.7% 64.3% 62.6%  
Iodine Leaching Yield, % 55.6% 54.6% 53.0% 55.8% 59.9% 54.7% 55.2% 59.9% 59.2% 56.4% 56.4%  
Yield process to produce Nitrates, % 43.4% 46.9% 48.2% 58.2% 59.0% 59.0% 57.8% 58.2% 58.0% 63.2% 58.6%  
Ponds Yield to produce Nitrates Salts, % 54.2% 60.7% 68.5% 64.3% 65.9% 64.7% 66.3% 63.5% 63.5% 63.5% 63.5%  
Prilled Iodine produced (kt) 10.7 10.1 10.6 11.1 10.3 10.0 11.3 10.8 10.1 89.6 13.8 184.6
Nitrate Salts for Fertilizers (kt) 608 649 796 843 914 852 878 812 886 8,017 1,507 15,256

 

a) The expected increase in caliche production requires reaching leaching yields over 70% for Nitrate leaching based on the projected increment in the water consumption for irrigation (0.52 m³/Ton). However, it’s advisable to keep the nitrate leaching yield in heap pads not above 70%, selecting sectors with a Nitrate grade above 5.0% and maintaining ore control to prevent dilution grade in mining process.

 

Process Requirements

 

This sub-section contains forward-looking information related to the projected requirements for energy, water, process materials and personnel for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecasts, or projections in the forward-looking information include any significant differences from one or more of the material factors, or assumptions, that were set forth in this sub-section including actual plant requirements that yield different results from the historical operations.

 

Figure 14-9 shows Nueva Victoria's process diagram with TEA project incorporated, giving an overall production process balance. It is important to note that input quantities will depend on caliche chemical properties, as well as iodide plant operation (whether operating in SX or blow-out mode) but will not exceed those indicated in the diagram.

 

SQM TRS Nueva Victoria Pag. 178

 

 

 

 

Figure 14-9. Projected Water and Reagent Consumption at Nueva Victoria with Implementation of the TEA Extension 

 

 

 

SQM TRS Nueva Victoria Pag. 179

 

 

 

 

The balance scenario shown corresponds to the situation of treatment of 65 Mtpy of caliche with 23 ktpy of iodine prill production.

  

Future energy and water needs will be satisfied by the infrastructure expansion plan considered in the TEA Project. This includes power transmission lines connected to electrical installations with new transformers to be located at mine operation centers, water supply centers, and the Nueva Victoria mining areas, as well as the Sur Viejo industrial area.

 

The following sections detail energy, water, staff, and process input consumption.

 

14.1.10Energy and Fuel Requirements

 

14.1.10.1Power and Energy

 

The power supply comes from permanent power lines to the site. Its function is to supply electricity to the industrial areas to carry out operations and to supply electricity to the adduction system, specifically through installed substations. There is a control portal and power distribution center at the facility. This center has a start-up power supply for the operations, laboratory, and plant.

 

Nueva Victoria has one substation, with two distribution systems. One system has a capacity of 50 MW and the other has a capacity of 60 MW. Associated with the Nueva Victoria 50 MW line, the consumption declared by SQM for the 2022 is of 21.048.180 kilowatt-hours (kWh), while for the line Nueva Victoria 60 MW, the energy consumption is 123,531,632 kWh.

 

In terms of power consumed and considering a calendar year of 365 days and 24 hours, the indicated energy values translate into a consumption of 2.40 MW for the available 50 MW power line and 14.10 MW for the available 60 MW power line. Therefore, for the year 2022, the electric power consumption was about 16.50 MW.

 

There is an auxiliary electricity supply system, via 500-kilovolt-amperes (kVa) generators, considered to be installed in both process plants planned for the expansion.

 

14.1.10.2Fuels

 

The operation will require 28,804 m3/y of diesel and 24 m3/y of petrol. Fuel will be supplied by duly authorized fuel trucks. Storage tanks in the Sur Viejo industrial area will be the source of the fuel.

 

Gas is a source of energy for operations at Iris. Gas is stored in liquefied gas storage tanks at the Iris camp.

 

SQM TRS Nueva Victoria Pag. 180

 

 

 

 

14.1.11Water Supply and Consumption

  

14.1.11.1 Water Supply System

 

Water supplies are required for basic consumption, drinking water consumption (treated and available in drums, dispensed by an external supplier) and for industrial quality work. As reported, the entire sector is supplied by an industrial water supply center located in Nueva Victoria.

 

For industrial water supply, groundwater will be extracted at an average rate of 810.8 L/s, from wellfields at the Salar de Sur Viejo, the Salar de Llamara and the Pampa del Tamarugal.

 

SQM has:

 

4 wells at Sur Viejo with consumptive rights totaling 103 L/s.

 

5 wells at the Iris with consumptive rights totaling 60.4 L/s.

 

Well TC-9, situated to southwest of the Salar de Bellavista.

 

7 wells in the Salar de Llamara with consumptive rights totaling 203.8 L/s.

 

7 wells in the Soronal with consumptive rights totaling 126 L/s.

 

4 Catchment wells with consumptive rights totaling 122.8 L/s.

 

SQM projects the addition of the following water resource supply capacity to its water rights:

 

113.1 L/s of groundwater extraction from new wells situated to the east of the Salar de Bellavista.

 

Groundwater extraction from the TC-10 well located in Salar de Llamara.

 

Surface water extraction through permanent and continuous surface consumptive rights for a maximum of 60 L/s granted in Quebrada Amarga.

 

Industrial water pipelines connect groundwater ponds to the mining and industrial areas of Nueva Victoria. For water extraction, pumping and transport, there is a network of pipes, pumping stations and power lines that allow extraction of the required industrial water and its transport and redistribution to the different points where it is required.

 

Water is supplied to an existing process water storage tank. Raw water is used for all purposes requiring clean water with low dissolved solids and salt content, mainly for reagent replenishment.

 

Raw water is treated in a reverse osmosis system; whose infrastructure includes tanks for water storage (industrial or potable). The potable water storage tank also supplies water for use in:

 

8 730.3 L/s (approved by the Direccion General de Aguas (DGA), The Chilean Regulator

 

SQM TRS Nueva Victoria Pag. 181

 

 

 

 

Safety showers and other similar applications:

  

Fire-fighting – the building of the Nueva Victoria, Iris and Sur Viejo COMS are equipped with water storage tanks for firefighting which supply hydrant & sprinkler systems.

 

Cooling water.

 

Boilers for steam generation.

 

In addition, the TEA project considers a seawater supply system (900 L/s design flow) to supplement the industrial process water supply. The seawater will be drawn from the coast at Puerto Patillos, 58 km northwest of the Nueva Victoria Property and 55 km SSW of the City of Iquique. The seawater will be stored in reception ponds at Nueva Victoria.

 

14.1.11.2Water Consumption

 

Table 14-9 summarizes the rate of groundwater pumping for industrial water supply by SQM, by sector, for the years 2020; 2021 & 2022.

 

Table 14-9 Historic Rates of Groundwater Extraction for Industrial Water Supply

 

Year Sur Viejo (L/s) Llamara (L/s) Iris (L/s) Soronal (L/s) Pampa Tamarugal (L/s) Total (L/s)
2020 105 225 61 127 117 635
2021 107 221 61 128 120 637
2022 103 203.8 60.4 126 122.8 616

 

Potable water will be required to cover all workers' consumption and sanitary needs. Potable water supply considers a use rate of 100 L/person/d, of which 2 L/person/d corresponds to drinking water at the work fronts and cafeterias. Commercial bottled water will be provided to staff. Sanitary water will be supplied from storage tanks located in the camp and office sectors, which will be equipped with a chlorination system. A total of 719 workers per month are required, considering the Nueva Victoria and Iris operations together, so the total amount of potable water will be 72 m3/day (0.83 L/s).

 

SQM TRS Nueva Victoria Pag. 182

 

 

 

 

Table 14-10 provides a breakdown of the estimated annual water requirement by potable and industrial water for year 2022. The heap leaching process corresponds to the greatest water demand.

  

Table 14-10 Nueva Victoria Industrial and Potable Water Consumption

  

Process Annual Volume (M³/Year) Equivalent Rate (L/s)
  Industrial Water  
Heap Leach 17.899.577 567,6
Puquios Reinjection 897.702 28,5
Mine 157.680 5,0
Iodide - Iodine Plants 242.511 7,7
Neutralization Plant
Solar Evaporation Ponds 449.085 14,2
Camp 63.073 2,0
Total Other Areas 1.800.142  57,1 
Mine
Iodide Plant
Iodine Plant
Neutralization Plant
Solar Evaporation Ponds
Camp
Puquios Reinjection
Total Industrial Water 21.509.770 693
Drinking Water 26.207 0,83

 

Figure 14-10 presents the historical rate of water consumption by the heap-leaching operation at Nueva Victoria over the period 2008 – 2022. In 2022 the consumption of industrial water for heap leaching was 567.6 L/s.

 

SQM TRS Nueva Victoria Pag. 183

 

 

 

 

Figure 14-10. Historical Rate of Consumption of Industrial Water by the Heap Leach Operation at Nueva Victoria (L/s)

 

 

   

14.1.11.3 Future Process Water Requirements

 

Future process water requirements, due to TEA Project incorporation, will be covered by adding a 900 L/s seawater supply system. This seawater supply system extends from an intake located in Patillos Bay at a depth of 25 m and 852 m from the beach line, through to the seawater storage ponds located at the Seawater System Terminal Station at Nueva Victoria.

 

This system will be implemented starting in 2024, with an initial capacity of 206 L/s, which will increase to 400 L/s between 2026 - 2028 and reach the full design capacity of 900 L/s by 2030.

 

14.1.12Staffing Requirements

 

An estimated 719 workers are required during Nueva Victoria and Iris operations, while an estimated 717 workers will be required for the TEA Expansion of the Nueva Victoria Property when that project is completed. Table 14-12 summarizes current and future workforce requirements.

  

SQM TRS Nueva Victoria Pag. 184

 

 

 

 

Table 14-11 Personnel Required by Operational Activity

 

Operational Activity Current Personnel, Nueva Victoria & Iris Operations Additional Personnel, TEA Expansion Project
Caliche Mining 475 474
Maintenance (mine-plant) 38 38
Iodide Production 17 17
Iodine Production 40 40
Neutralization System 2 2
Evaporation System-Operations 75 75
Evaporation System, Maintenance 72 71
Total 719 717

 

14.1.13Process Plant Consumables

 

Raw materials such as sulfur, chlorine, paraffin, sodium hydroxide, or sulfuric acid, are added to the plants to produce a concentrated iodide solution which is then used in iodine production. These materials are transported by trucks from different parts of the country. A-412, which connects with Route 5, is the main route for vehicular flows required for input supply and raw material shipment.

 

Reagent Consumption Summary

 

Table 14-12 summarizes the main annual materials required for Nueva Victoria's operations to the nominal production rate of 11 kt iodine prill. This table also includes a total requirement for the future expansion of TEA project. It is worth noting that some of the inputs can be replaced by an alternative compound; for example, sulfur can be replaced by liquid sulfur dioxide, kerosene can be replaced by sodium hydroxide and finally, lime can be replaced by sodium carbonate.

 

It is important to note that there are ranges of consumption factors that have been studied through historical operational data of plant treatment. The ranges are established according to the different qualities of brine obtained from the treated resource. These factors allow projecting the requirements of reagents and process inputs, both for annual, short- and long-term planning.

 

SQM TRS Nueva Victoria Pag. 185

 

 

 

Table 14-12 Process Reagents and Consumption Rates per Year, NV

 

Reagent and Consumables Function or Process Area Units Cosumption of Nueva Victoria (11 kton iodine prill) Consumption with TEA (23 kton iodine prill)
Sodium Hypochlorite Addition Of Sodium Hypochlorite Solution in The Seawater Pipeline Suction. Tpy 29 60
  Iodide And Iodine Consumption Tpy 2,228 4,659
      23,102 48,305
Ammonium Nitrate Necessary for Blasting Tpy 13,860 22,000
Sulfuric Acid Iodide Plant Tpy 16,652 34,464
Sulfur Iodide And Iodine Plants Tpy 9,058 24,699
      825 2,990
Liquid Sulfur Dioxide Used as an Alternative to Solid Sulfur Tpy 23,626 49,399
      2,860 5,980
Kerosene At The Iodide Plant as a Solvent Tpy 6,007 12,062
Sodium Hydroxide At the Iodine Plants and at the Iodide Plant as Replacement of Kerosene Tpy 1,935 34,464
      166 690
Chlorine Supply Chlorine to the Iodine Plants as an Oxidizer Tpy 2,563 5,360
  To The Iodide Plants Tpy 247 517
Filter Aid Alpha Cellulose Powder used to Iodide and Iodine Plants Tpy 72 150
    Tpy 43 90
Codium Chloride Iodide Plant Tpy 613 1,281
    Tpy 6,353 13,284
Hydrogen Peroxide Iodine Plant as an Oxidizer Tpy 2,136 5,520
Activated Carbon At the Iodine Plant Tpy 52 117
Sulfonitric Acid At the Iodine Plant Tpy 72 150
Sodium Metabisulfite Iodine Plant Tpy 132 276
Lime (75 % Cao) Neutralization Plant Tpy 7,979 19,000
  Heap Tpy 2,391 5,000
Lime (95 % Cao) Heap Tpy 2,674 2,500
Sodium Carbonate Neutralization Plant for Lime Replacement Tpy 17,217 36,000
  Heap Tpy 16,483 34,464
Others        
Fuel Oil Iodine Plant Tpy 399 1,817
Barrels Packaging Pcs/Month 15,105 31,584
Polyethylene Bags Packaging Pcs/Month 17,948 37,527
Krealon Bags Packaging Pcs/Month 16,452 34,399
Maxi Bags Packaging Pcs/Month 414 865

 

It should be noted that when the Project's Nitrate Plant is built and becomes operational, 2,050,000 tpy of nitrate salts will be processed to produce 1,000,000 tpy of potassium nitrate and 1,200,000 tpy of potassium nitrate, for which it will require the following processing inputs in addition to those detailed above (Table 14-13).

 

SQM TRS Nueva Victoria Pag. 186

 

  

 

Table 14-13 Process Reagents and Consumption Rates per year with Nitrate Plant (Planned).

 

Reagent and  Consumables Units Consumption
Potassium Chloride Tpy 924,000
Potassium Salts   3,314,000
Fuel Oil   33,500
Diesel   31,500

 

14.1.13.1Reagent handling and storage

 

To operate, inputs used are stored in stockpiles and tanks, facilities available in the area known as the input reception and storage area. To store the inputs used in the Nueva Victoria plants, the following infrastructure are used:

 

Sulfur storage facilities.

 

Paraffin tanks.

 

Sulfuric acid tanks.

 

Peroxide tanks.

 

Chlorine tanks (mobile).

 

Bunker oil tanks.

 

Diesel oil tanks.

 

Sulfonitric acid tank.

 

In the case of inputs used at Iris' iodine plant, the storage facilities include:

 

Sulfur storage facilities.

 

Sulfuric acid tanks.

 

Diesel oil tank.

 

Caustic soda tank.

 

Calcium carbonate silo.

 

Each reagent storage system assembly is segregated based on compatibility and is located within curbed containment areas to prevent spill spreading and incompatible reagents from mixing. Drainage sumps and pump sumps are provided for spill control.

 

SQM TRS Nueva Victoria Pag. 187

 

  

 

14.1.14Air Supply

 

High pressure air at 600-700 kPa is produced by compressors in place to satisfy the requirements of the plant as well as the equipment. High pressure air supply is dried and distributed through air receivers located throughout the plant. Each process plant has a compressor room to supply air to the compressors.

 

Qualified Person´s Opinion

 

According to Gino Slanzi Guerra, QP responsible for metallurgy and resource treatment:

 

Metallurgical test data on the resources planned to be processed in the projected production plan to 2023 indicate that recovery methods are adequate. The laboratory, bench and pilot plant scale test program conducted over the last few years has determined that feedstock is reasonably suitable for production and has demonstrated that it is technically possible using plant established separation and recovery methods to produce iodine and nitrate salts. Based on this analysis, the most appropriate process route, based on test results and further economic analysis of the material, are the unit operations selected which are otherwise typical for the industry.

 

In addition, historical process performance data demonstrates reliability of recovery estimation models based on mineralogical content. Reagent forecasting and dosing will be based on analytical processes that determine mineral grades, valuable element content and impurity content to ensure that system treatment requirements are effective. Although there are known deleterious elements and processing factors that can affect operations and products, the company has incorporated proprietary methodologies for their proper control and elimination. These are supported by the high level of expertise of its professionals, which has been verified at the different sites visited.

 

The mineralogical, chemical, physical and granulometric characterization results of the mineral to be treated, obtained from trials obtained, allow continuous evaluation of processing routes, either at the initial conceptual stages of the project or during the process already established, to ensure that the process is valid and in force, and/or to review optimal alternatives to recover valuable elements based on resource nature. Additionally, analysis methodologies determine deleterious elements, to establish mechanisms in operations so that these can be kept below the limits to ensure a certain product quality.

 

SQM TRS Nueva Victoria Pag. 188

 

  

 

 

15Project Infrastructure

  

This section contains forward-looking information related to locations and designs of facilities comprising infrastructure for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecasts, or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that were set forth in this sub-section including Project development plan and schedule, available routes and facilities sites with the characteristics described, facilities design criteria, access, and approvals timing. The analysis of the infrastructure in New Victoria has been developed considering current facilities and requirements associated with future projects. This Section describes the existing facilities and planned expansion projects.

 

SQM's mining sites in Tarapacá Region, Nueva Victoria, and Iris, are in Tarapacá Region, in Iquique and Tamarugal provinces, communes of Iquique and Pozo Almonte, approximately 145 km southeast from Iquique and 85 km south from Pozo Almonte, in the case of Nueva Victoria, and 120 km southeast from Iquique in the case of Iris, located close to Iris office (Figure 15-1). These works as a whole involve a surface area of approximately 92.998 ha, including the TEA Project. The geographical reference location is 7,682,276 N, 431,488E, with an average elevation of 891 masl.

 

In late 2002, in order to restore mining operations at Nueva Victoria East, SQM re-established mining operations at Nueva Victoria East. Mineral at Nueva Victoria is transported by truck to heap leaching facilities, where iodine is produced. This site is constituted by facilities located in three sectors corresponding to Nueva Victoria, Sur Viejo, and Iris.

 

Figure 15-2 shows Nueva Victoria's geographic location. It also shows, for reference purposes, other sites belonging to SQM (Coya Sur, Salar de Atacama, and Salar del Carmen), and facilities used to distribute its products (Port of Tocopilla, Port of Antofagasta, and Port of Iquique).

 

From caliche, this site produces iodine and nitrate-rich salts through heap leaching and evaporation ponds. The main raw material required for the production of nitrate and iodine is caliche mineral, which is obtained from SQM's surface mines. The areas that are currently mined are located approximately 20 km northwest of Nueva Victoria.

 

Iodine extraction from caliche is a well-established process, but variations in the iodine and other chemical content of treated mineral and other operational parameters require a high level of technical expertise to manage effectively.

 

Caliche mineral in northern Chile contains a unique deposit of nitrate and iodine known throughout the world and is the world's largest commercially exploited source for natural nitrate. From these caliche mineral deposits, a wide range of nitrate-based products are produced, used as specialty plant nutrients and industrial applications as well as iodine and iodine derivatives

 

SQM TRS Nueva Victoria Pag. 189

 

 

 

 

Figure 15-1. General Location of Nueva Victoria

  

 

 

SQM TRS Nueva Victoria Pag. 190

 

 

 

 

Figure 15-2. Location of Nueva Victoria Production Area

 

 

  

Iodine and its derivatives are used in a wide range of medical, pharmaceutical, agricultural and industrial applications, including x-ray contrast media, polarizing films for liquid crystal display (LCD/LED) screens, antiseptics, biocides and disinfectants, in pharmaceutical synthesis, electronics, pigments and dye components.

 

The solutions resulting from caliche mineral leaching at Nueva Victoria plant are used to produce iodine from the iodate contained inside them. Iodine is extracted from aqueous and concentrated solutions in iodide form using solvent extraction in plants at Nueva Victoria, Pedro de Valdivia and Iris. Details on the process facilities and the iodine and nitrates extraction can be found n Section14.

 

Prilled iodine is tested for quality control purposes, using international standard procedures it has implemented, and then packaged in 20 - 50 kg drums or 350 - 700 kg maxi bags and transported by truck to Antofagasta, Mejillones or Iquique for export.

 

Figure 15-3 shows Nueva Victoria's process diagram.

 

SQM TRS Nueva Victoria Pag. 191

 

 

 

 

Figure 15-3. Nueva Victoria Plant Process Diagram

 

 

 

SQM S.A.'s surface area under Mining Concessions for Exploitation associated with caliche Mineral Resources for its mining operations as of 31 December 2022 is approximately 558,562 ha (Figure 15-4).

 

Figure 15-4. Nueva Victoria Site Resource Diagram

 

 

 

In September 2010, the National Environmental Commission (now the Environmental Assessment Service) approved Pampa Hermosa's Environmental Study in Chile's Tarapacá Region (RCA N°890/2010).

 

SQM TRS Nueva Victoria Pag. 192

 

 

 

 

This approval allowed SQM to have a production capacity at Nueva Victoria of 11,000 t of iodine per year and to produce up to 1.2 Mt of nitrates, extract up to 37 Mt of caliche per year, and use new water rights of up to 665.7 L/s.

  

At Iris, SQM has approved 2,000 t of iodine production per year with annual caliche extraction of up to 6.48 Mt. In recent years SQM has invested to increase water capacity at Nueva Victoria's operations from two water sources approved by Pampa Hermosa's Environmental Study and to expand the capacity of solar evaporation ponds and implement new mining areas and solution collection.

 

In 2011 and 2013, SQM completed iodine plant capacity expansions at Nueva Victoria.

 

In 2014, SQM made investments in new mining sector development and production increases for both nitrates and iodine at Nueva Victoria, achieving a production capacity (including Iris facility) of approximately 8,500 tpy of iodine at that site.

 

In November 2015, mining and nitrate operations at Pedro de Valdivia were suspended and iodine production at the site was reduced to take advantage in the more efficient production facilities at Nueva Victoria. Pampa Blanca's operations were suspended in 2010 and Maria Elena's operations were suspended in October 2013.

 

During 2017, iodine production capacity at Nueva Victoria was increased to approximately 10,000 tpy.

 

Currently, Nueva Victoria has a production capacity of approximately 13,000 metric tpy of iodine in an area of about 48,000 ha and 1,000,000 metric ton of nitrates per year.

 

Current total effective production capacity at the iodine production plants (Nueva Victoria, Iris, Pedro de Valdivia) is approximately 14,800 tpy.

 

Total iodine production in 2022 was 12,400 t, 10,800 ton from Nueva Victoria (with loading fronts TEA, and NV Norte), 1,250 t from Iris, and 1,600 t from Pedro de Valdivia. Nueva Victoria is also equipped to produce iodine from iodide delivered from the other plants. There is flexibility to adjust production according to market conditions.

 

Some of iodine produced is used to manufacture inorganic iodine derivatives, which are intermediate products used to make nutritional and agricultural applications, at facilities located near Santiago, Chile, and to produce organic and inorganic iodine derivatives in collaboration with Ajay, a company that purchases iodine. Iodine-derived products have been marketed mainly in South America, Africa, and Asia, while Ajay and its affiliates have marketed iodine derivatives mainly in North America and Europe.

 

During 2020, progress was made on the TEA project development and environmental processing. In November 2021, SQM's TEA project was favorably classified by Tarapacá Region's Environmental Assessment Commission.

 

It involves an investment of USD350 million and aims to incorporate new mine areas for iodide, iodine, and nitrate-rich salts production at Nueva Victoria mine, which will increase the total amount of caliche to be extracted and the use of the sea water for these processes.

 

SQM TRS Nueva Victoria Pag. 193

 

 

 

 

This project consists in modifying Nueva Victoria mine, which consists of:

  

a)New mine areas (436 Km2), with a caliche extraction rate of 28 Mtpy, resulting in a total of 65 Mtpy.

 

b)Two new Iodide production plants (6,000 tpy each), for a total of 23,000 tpy.

 

c)One new iodine production plant (12,000 tpy) for a total of 23,000 tpy.

 

d)New evaporation ponds to produce nitrate-rich salts (1,950,000 tpy) for a total of 4,000,000 tpy.

 

e)New operational irrigation centers and distribution pipe solutions which should cover the new mine area.

 

f)New truck workshops and supporting infrastructure such as roads, casinos, offices, control rooms, etc.

 

g)A new neutralization system, a seawater conveyance (900 L/s maximum) from Patillos Bay sector to the mining area.

 

Access to Production, Storage and Port Loading Areas

 

The main access for vehicular traffic will be through a private existing road and A-760 Route. This private road will be accessed from Route 5. Access to Route A-760 may be from Route A-750 or from Route 5.

 

Additionally, the TEA Project considers two service roads - a road that connects the north-west sector (mine areas) with the coastal sector, where seawater suction works are located; and an internal road that will run from south to north, parallel to electric transmission line.

 

SQM's products and raw materials are transported by trucks, which are operated by third parties under long-term, dedicated contracts,

 

Iodine raw material, obtained from the same caliche used for nitrate production, is processed, packaged, and stored exclusively at Nueva Victoria and Pedro de Valdivia facilities.

 

Iodine is packaged in FIBC drums and maxi-bags with an inner polyethylene bag and oxygen barrier. When transported, it is consolidated in containers and sent by truck to port terminals suitable for handling, mainly in Antofagasta, Mejillones, and Iquique.

 

They are then shipped to the different markets by container ship, or by truck to Santiago where iodine derivatives are produced at Ajay-SQM Chile's plants.

 

In Nueva Victoria, nitrate raw material is produced for potassium nitrate production at Coya Sur, whose plant, also owned by SQM, is located 161 km southwest of Nueva Victoria by road.

 

SQM TRS Nueva Victoria Pag. 194

 

 

 

 

Production Areas and Infrastructure

  

The main facilities of the Nueva Victoria production area are as follows:

 

Caliche extraction mine.

 

Industrial water supply.

 

Leaching.

 

Iodide plants NV.

 

Iodine and Prilling Plant NV.

 

Evaporation ponds.

 

Iodine Iris Plant.

 

Camp and Offices.

 

Domestic waste disposal site.

 

Hazardous Waste Yard.

 

Non-hazardous industrial waste yard.

 

Figure 15-5 depicts the Nueva Victoria site layout.

 

Figure 15-5. Nueva Victoria Site Layout

 

 

SQM TRS Nueva Victoria Pag. 195

 

 

 

 

The Nueva Victoria mining areas and process facilities are described in more detail below.

 

15.2.1 Caliche Mine Areas

 

Caliche ore is blasted and dug at Nueva Victoria and Iris. The minimum thickness of caliche ore that SQM will mine is 1.5 m. The ore deposits are mined on a 25 x 25 m grid pattern.

 

The surface area authorized for mining at Nueva Victoria is 844 km². The surface area authorized for mining at Iris is 45.5 km². No expansion is planned at Iris.

 

Caliche extraction at Nueva Victoria is 37 Mtpy, with an additional 6.48 Mtpy at Iris. The overall mining rate at Nueva Victoria and Iris is a 71.48 Mtpy with the incorporation of TEA Expansion.

 

15.2.2 Heap Leaching

 

Heap leaching: platforms (normally 90 x 500 m) with parapets around the perimeter and with bottom waterproofed with HDPE membranes), which are loaded with required caliche (between 400 to 1000 Mton) and are irrigated with different solutions (Industrial Water, Industrial water + BF mix or Intermediate Solution).

 

Mine Operation Centers (COM) represent a set of heap leaching facilities, with brine accumulation ponds (poor solution, intermediate solution, and rich solution), recirculated brine ponds, industrial water ponds and their respective pumping and impulsion systems.

 

Auxiliary infrastructure includes general service facilities destined for workers.

 

15.2.3 Iodide Plants

 

Iodide production at the Nueva Victoria Iodide Plant totals 11 ktpy. The Iris Iodide Plant produces an additional 2 ktpy. Whit the TEA expansion the combined Nueva Victoria plus Iris iodide production will reach 25 ktpy.

 

The infrastructure at the iodide plants includes the following:

 

Storage ponds to hold the brine received from the heap leaching operation.

 

SO2 generation units.

 

Absorption towers with their respective pick-up tanks.

 

SX units.

 

Stripping system.

 

Gas scrubbing system.

 

BF storage ponds with their respective pumps.

 

SQM TRS Nueva Victoria Pag. 196

 

  

 

 

15.2.4 Iodine Plant

  

The Iodine Plant at Nueva Victoria receives iodide from the iodide plants at Nueva Victoria and Iris. The current production capacity of the Nueva Victoria Iodine Plant is 11 ktpy. This increase to 23 ktpy whit the TEA expansion.

 

The infrastructure at the iodine plant includes the following:

 

Iodide storage ponds (concentrated, filtered, or conditioned).

 

Filters (perrin, or duplex plates).

 

Activated carbon towers for iodide conditioning.

 

Oxidizers.

 

Reactors (for smelting, refining and prilling stages).

 

Prilling towers.

 

Prill grading sieving systems.

 

Gas scrubbing system.

 

Boiler room.

 

Warehouse for packaging and temporary storage (product awaiting approval).

 

Dispatch warehouse with a rack system for product storage.

 

15.2.5 Ancillary Infrastructure at the Nueva Victoria COM

 

The following facilities are available for the storage of consumables used in the iodide and iodine plants:

 

Sulfur stockpiles for the generation of sulfur dioxide.

 

Kerosene tanks.

 

Sulfuric acid tanks.

 

Hydrogen peroxide storage tanks.

 

Mobile storage tanks for chlorine.

 

Oil storage tanks.

 

Diesel storage tanks.

 

Sulfonitric acid storage tanks.

 

SQM TRS Nueva Victoria Pag. 197

 

 

 

The Nueva Victoria COM is also equipped with the following systems and infrastructure:

  

Firefighting water system.

 

Water storage tank with its respective pump and piping system distributed throughout the entire plant installation.

 

Reverse osmosis system, including water storage tanks (industrial or drinking water).

 

Generator room.

 

Compressor room.

 

Control room.

 

Office building.

 

Ponds used with intermediate process solutions.

 

Equipment maintenance workshop.

 

Material and replacement parts yard.

 

Electrical control rooms.

 

15.2.6 Evaporation Ponds

 

This facility, located in the industrial area of Sur Viejo, receives AFA piped 20 km from the iodide plant at Nueva Victoria.

 

Current production of high-nitrate salts at Nueva Victoria is 2.05 Mtpy. This is projected to increase to a total of 4 Mtpy whit the TEA expansion.

 

The current facility covers an area of 8.34 km², this will increase to a total of 18.51 km² with the TEA expansion.

 

The evaporation ponds facility includes the following infrastructure:

 

Neutralization Plant to raise the pH of the influent AFA.

 

Solar evaporation ponds.

 

Auxiliary facilities.

 

Figure 15-6 presents an aerial view of the evaporation ponds facility at Sur Viejo.

 

SQM TRS Nueva Victoria Pag. 198

 

 

 

 

Figure 15-6. General View of The Evaporation Ponds at the Sur Viejo Industrial Area

 

  

15.2.7 Neutralization Plant

 

AFA is neutralized by mixing it with a slurry of calcium hydroxide. Neutralization takes place in mixing ponds that discharge into ponds that allow sedimentation of solids in suspension, such as gypsum.

 

15.2.8 Solar Evaporation Ponds

 

Solar evaporation ponds are divided into pre-concentration ponds, production ponds and purge ponds. Figure 15-7 shows a panoramic view of a part of the solar evaporation ponds.

 

SQM TRS Nueva Victoria Pag. 199

 

  

 

 

Figure 15-7. General View of Solar Evaporation Ponds in Sur Viejo

 

 

 

In the pre-concentration ponds, discard salts precipitate, which are harvested and placed in discard salt stockpiles that have a waterproofed base to recover the solution from the squeezing or impregnation. Nitrate-rich salts precipitate in the production ponds are harvested and stockpiled in product ponds.

 

These nitrate-rich salts are shipped by truck to SQM's facilities in the Antofagasta Region

 

15.2.9 Auxiliary Facilities

 

These include offices, bathrooms, dressing rooms and a cafeteria for personnel working there, a reverse osmosis plant and a sewage treatment plant (TAS).

 

15.2.10 Iris Iodine Plant

 

Located at the Iris COM, it includes the following infrastructure:

 

Iodide plant

 

Auxiliary installations

 

Iodine plant

 

Figure 15-8 presents an aerial view of the Iris Iodine Plant.

 

SQM TRS Nueva Victoria Pag. 200

 

   

Figure 15-8. General View of The Iris Iodine Plant Area

 

 

 

To produce iodine at Iris the plant that cover reception of raw materials to producing iodine prill as a final product.

 

SQM TRS Nueva Victoria Pag. 201

 

  

 

The main equipment and infrastructure included in iodine plant are:

  

SO2 generation furnaces,

 

Iodization absorption towers, each with its respective TK pick up, cooler and TK seal,

 

Iodine reception TK from the iodization towers,

 

Scrubber or gas scrubber with its respective TK seal,

 

TK for primary cutting,

 

Blow-out modules, consisting of absorption tower, desorption tower and NaOH TK,

 

concentrated iodide TK,

 

Brine feble pond for blow-out modules discard solution, with their respective pumps,

 

Crystallizers (secondary cutting),

 

Reactors (for smelting, refining and prilling stages),

 

Prilling tower,

 

Dryers and sifters,

 

Boiler room.

 

Packaging and shipment facilities include.

 

Auxiliary facilities.

 

Storage facilities at the at Iris iodine plant include:

 

Sulfur storage yard

 

Sulfuric acid tanks,

 

Diesel oil tank,

 

Caustic soda tank

 

Other infrastructures around the plant include:

 

Osmosis plant and water storage ponds

 

TAS plants (sewage treatment)

 

Generator room

 

Compressors

 

SQM TRS Nueva Victoria Pag. 202

 

  

 

 

Control room

  

Administrative offices

 

Ponds used with intermediate process solutions,

 

Maintenance workshop,

 

Camp and Offices.

 

In the industrial sectors of Nueva Victoria and Iris, the following annexed facilities are available:

 

General office facility

 

Offices

 

Training room,

 

Cafeteria,

 

Camp,

 

Warehouse,

 

Domestic waste disposal site,

 

Hazardous waste yard and

 

Non-hazardous industrial waste yard.

 

Communications

 

The facilities have telephone, internet, and television services via satellite link or by fiber optics supplied by an external provider.

 

Communication for operations staff is via communication radios with the same frequency.

 

Communication to the control system, CCTV, internal telephony, energy, and data monitoring is via its own fiber optics, which connects process plants and control rooms.

 

15.3.1 Information Systems and IT

 

In addition to the facilities mentioned above, SQM operates several computer and information systems that connect its main subsidiaries to operational and administrative facilities in Chile and other parts of the world. IT and information systems are mainly used for finance, accounting, human resources, supply and inventory tracking, invoicing, quality control, research activities, as well as production and maintenance process control. The mainframe computer system is located at Santiago offices and Chilean and international subsidiaries are interconnected with each other through data links.

   

SQM TRS Nueva Victoria Pag. 203

 

  

 

Water Supply

 

Water for Nueva Victoria's facilities is obtained from ground water ponds near the production facilities. Currently, the new EIA TEA considers seawater from an aqueduct to be constructed by SQM.

 

For industrial water supply, there are groundwater extraction ponds in Salar de Sur Viejo, Pampa del Tamarugal and Salar de Llamara, whose water rights have been approved as shown in Table 15-1:

 

Table 15-1. Approved Water Rights, by Sector

 

Ponds Location Sector Approved water right
Salar de Sur Viejo 107
Pampa del Tamarugal 378.6
Salar de Llamara 244.7
Total 730.3

 

The current authorized groundwater extraction for industrial use is 810.8 L/s, increasing by an additional 900 L/s due to seawater conveyance (TEA project), reaching a total of 1,710.8 L/s for industrial use.

 

The average water abstraction records (L/s) during 2020 to 2022 are included in Table 15-2

 

Table 15-2. Average Water Extraction, by Sector

 

Pond location sector Water extraction average value 2020 (l/s) Water extraction average value 2021 (l/s) Water extraction average value 2022 (l/s)
Salar de Sur Viejo 104.68 106.5 103
Pampa del Tamarugal 304.89 309.3 309.2
Salar de Llamara 225.48 220.62 203.8
Total 635.05 636.42 616

 

A network of pipelines, pumping stations, and power lines are used for water extraction, pumping, and transport to storage ponds, and from there to the different points where it is required. Average water consumption is 567 l/s.

 

The difference between extraction of 616 L/s compared to consumption of 567 L/s, in other words, 49 L/s (approximately 2,649,024 m³/y) is accumulated in pools and/or ponds.

 

Water Treatment

 

The volume of treated water at the wastewater treatment plant in 2022 was 11,738 m³.

 

Mining waste generated at the site correspond to depleted heap leaching, overburden, and waste salts.

 

SQM TRS Nueva Victoria Pag. 204

 

 

Power Supply

  

These facilities, shown in Figure 15-9, are connected to the National Electric System, Arica-Diego de Almagro area. The electrical system in the north of the country is called "Sistema Interconectado Norte Grande" or SING.

 

Nueva Victoria Tap-Off Substation has 220-, 66-, and 23-kV high-voltage yards in single bus configuration. It is currently connected to Circuit No. 1 of the Lagunas - Crucero 220-kV National Transmission Line, and to the line, called Lagunas - Nueva Victoria, with 220-kV voltage and 211-MVa capacity.

 

Figure 15-9. Geographical location of S/E Tap Off Nueva Victoria

 

 

 

SQM TRS Nueva Victoria Pag. 205

 

 

 

 

16MARKET STUDIES

  

This section contains forward-looking information related to commodity demand and prices for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecasts, or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that were set forth in this section including prevailing economic conditions, commodity demand and prices are as forecasted over the Long-Term period.

 

The Company

 

SQM is the world’s largest producer of potassium nitrate and iodine and one of the world’s largest lithium producers. It also produces specialty plant nutrients, iodine derivatives, lithium derivatives, potassium chloride, potassium sulfate and certain industrial chemicals (including industrial nitrates and solar salts). The products are sold in approximately 110 countries through SQM worldwide distribution network, with more than 92% of our sales in 2021 derived from countries outside Chile.

 

The business strategy is to maintain the world leadership position in the market for iodine, potassium nitrate, lithium, and salts.

 

The products are mainly derived from mineral deposits found in northern Chile. Mine and process caliche ore and brine deposits.

 

Caliche ore in northern Chile contains the only known nitrate and iodine deposits in the world and is the world's largest commercially exploited slice of natural nitrate.

 

From the caliche ore deposits, SQM produces a wide range of nitrate-based products used for specialty plant nutrients and industrial applications, as well as iodine and its derivatives.

 

The SQM´s products are divided into six categories:

 

specialty plant nutrients,

 

iodine and its derivatives,

 

industrial chemicals,

 

lithium and its derivatives,

 

potassium chloride and potassium sulfate,

 

other commodity fertilizers.

 

SQM TRS Nueva Victoria Pag. 206

 

 

 

 

The following table presents the percentage breakdown of SQM's revenues for 2021, 2020, 2019 and 2018 according to the product lines:

  

Table 16-1 Percentage Breakdown of SQM's Revenues for 2021, 2020, 2019 and 2018

 

Revenue breakdown 2021 2020 2019 2018
Specialty Plant Nutrition 32% 39% 37% 35%
Lithium and derivatives 33% 21% 26% 33%
Iodine and derivatives 15% 18% 19% 15%
Potassium 15% 12% 11% 12%
Industrial chemicals 5% 9% 5% 5%
Other products and services 1% 2% 2%  
Total 100% 100% 100% 100%

 

Iodine and its Derivatives, Market, Competition, Products, Customers

 

SQM is one of the world's leading producers of iodine and its derivatives, which are used in a wide range of medical, pharmaceutical, agricultural, and industrial applications, including x-ray contrast media, polarizing films for liquid crystal displays (LCD/LED), antiseptics, biocides, and disinfectants, in the synthesis of pharmaceuticals, electronics, pigments and dye components.

 

In 2021, the SQM’s revenues from iodine and iodine derivatives amounted to US$437.9 million, representing 15.3% of our total revenues in that year. We estimate that our sales accounted for approximately 31% of global iodine sales by volume in 2021.

 

SQM's strategy for the iodine business is:

 

i.To achieve and maintain sufficient market share to optimize the use of the available production capacity.

 

ii.Encourage demand growth and develop new uses for iodine.

 

iii.Participate in the iodine recycling projects through the Ajay-SQM Group (“ASG”), a joint venture with the US company Ajay Chemicals Inc. (“Ajay”).

 

iv.Reduce the production costs through improved processes and increased productivity to compete more effectively.

 

v.Provide a product of consistent quality according to the requirements of the customers.

 

SQM TRS Nueva Victoria Pag. 207

 

 

 

 

16.1.1Iodine Market

 

Iodine and iodine derivatives are used in a wide range of medical, agricultural, and industrial applications as well as in human and animal nutrition products. Iodine and iodine derivatives are used as raw materials or catalysts in the formulation of products such as X-ray contrast media, biocides, antiseptics and disinfectants, pharmaceutical intermediates, polarizing films for LCD and LED screens, chemicals, organic compounds, and pigments. Iodine is also added in the form of potassium iodate or potassium iodide to edible salt to prevent iodine deficiency disorders.

  

X-ray contrast media is the leading application of iodine, accounting for approximately 24% of demand. Iodine’s high atomic number and density make it ideally suited for this application, as its presence in the body can help to increase contrast between tissues, organs, and blood vessels with similar X-ray densities. Other applications include pharmaceuticals, which we believe account for 13% of demand; LCD and LED screens, 13%; iodophors and povidone-iodine, 8%; animal nutrition, 8%; fluoride derivatives, 7%; biocides, 6%; nylon, 4%; human nutrition, 4% and other applications, 14%.

 

Japan has the world's largest reserves of iodine, contained in brines rich in sodium iodide (NaI) in natural gas wells east of Tokyo, and estimated at 5 million tons of contained iodine. For reasons of geotechnical stability of the wells, the extraction of brine has a controlled flow, so its production is limited in its level current.

 

Iodine resources in Chile are found in the nitrate deposits of the regions of Tarapacá and Antofagasta, in the form of calcium iodate, Ca(IO3)2 in typical concentrations of 400 ppm (0.04% iodine by weight). It is obtained in co-production with sodium nitrate. The reserves in these deposits are estimated at 1.8 million tons of iodine, the second in the world.

 

The USA has similar resources in its type to Japan, but to a lesser extent (250,000 tons).

 

During 2021, the demand for iodine had a significant recovery compared to 2020 and exceeded the demand levels of 2019. Main drivers of this increase were in the X-ray contrast media market, in which demand grew by 14-15% compared to 2020, mainly due to worldwide growth in the healthcare industry spending during the year and increased accessibility to these types of treatments in emerging economies, mainly China. Another application for which demand increased above the market average was polarizing films for screens, growing around 6% compared to 2020, due to the reduction in TV costs, increased screen sizes and home office and home school trends because of the pandemic.

 

SQM TRS Nueva Victoria Pag. 208

 

 

 

 

The following figure shows the evolution of the production of iodine and its derivatives in Chile, from 1996 to 2021.

 

Figure 16-1. Iodine and Derivates, Production Evolution 1996-2021

 

 

 

Source: Chilean Copper Commission Non-Metallic Mining Statistics.

 

SQM supplies 12,300 metric tons of iodine and derivatives and other companies contribute the difference. The other Chilean producers are Atacama Chemical S.A. (Cosayach), controlled by the Chilean holding company Inverraz S.A.; ACF Minera S.A., owned by the Chilean Urruticoechea family; Algorta Norte S.A., a joint venture between ACF Minera S.A. and Toyota Tsusho; and Atacama Minerals, which is owned by Chinese company Tewoo.

 

16.1.2Iodine Products

 

SQM produce iodine in our Nueva Victoria plant, near Iquique, and our Pedro de Valdivia plant, close to María Elena. The total production capacity of approximately 16,000 metric tons per year of iodine, including the Iris plant, which is located close to the Nueva Victoria plant.

 

Through ASG, SQM produces organic and inorganic iodine derivatives. ASG was established in the mid-1990s and has production plants in the United States, Chile, and France. ASG is one of the world’s leading inorganic and organic iodine derivatives producer.

 

Consistent with the business strategy, SQM works on the development of new applications for iodine-based products, pursuing a continuing expansion of the businesses and maintaining the market leadership.

 

SQM TRS Nueva Victoria Pag. 209

 

 

 

 

SQM manufactures its iodine and iodine derivatives in accordance with international quality standards and have qualified its iodine facilities and production processes under the ISO 9001:2015 program, providing third party certification of the quality management system and international quality control standards that SQM has implemented.

  

SQM’s revenues increased to US$437.9 million in 2021 from US$334.7 million in 2020. This increase was primarily attributable to higher sales volumes and higher average prices during 2021. Average iodine prices were more than 2.8% higher in 2021 than in 2020. Our sales volumes increased 27.2% in 2021.

 

Revenues from sales of iodine and derivatives during the twelve months ended December 31, 2021, were US$437.9 million, an increase of 30.9% compared to US$334.7 million generated for the twelve months ended December 31, 2020. During 2021, global demand for iodine had a significant recovery compared to 2020, even exceeding the demand levels seen before the COVID-19 pandemic. Main drivers of this increase were seen in the X-ray contrast media market, which demand grew by 14-15% compared to 2020, mainly due to worldwide growth in the healthcare industry spending during the year and increased accessibility to these types of treatments in emerging economies. This strong recovery led to a strong pricing environment during the year, with prices increasing over 11% in the fourth quarter 2021 when compared to the third quarter. As a result of tight supply/demand equilibrium, we are expecting the upward pricing trend to continue during 2022. We believe that demand growth in 2022 could be around 1%. We believe average prices in 2022 could be significantly higher.

 

The following table shows the total sales volumes and revenues from iodine and iodine derivatives for 2021, 2020, 2019 and 2018:

 

Table 16-2 Iodine and derivates volumes and revenues, 2018 - 2021

 

Sales volumes

(Thousands of metric tons)

2021 2020 2019 2018
Iodine and derivatives 12.3 9.7 12.7 13.3

Total revenues

(In US$ millions)

437.9 334.7 371 325

 

SQM TRS Nueva Victoria Pag. 210

 

  

 

 

16.1.3Iodine: Marketing and Customers

  

In 2021, we sold our iodine products in approximately 52 countries to approximately 260 customers, and most of our sales were exports. Two customers each accounted for more than 10% of our iodine revenues in 2021. These two customers accounted for approximately 42% of revenues, and our ten largest customers accounted in the aggregate for approximately 77% of revenues. No supplier accounted for more than 10% of the cost of sales of this business line.

 

The following table shows the geographical breakdown of the revenues:

 

Table 16-3 Geographical Breakdown of the Revenues

 

Revenues Breakdown 2021 2020 2019 2018
North America 23% 27% 24% 26%
Europe 40% 42% 33% 34%
Chile 0% 0% 0% 0%
Central and South America (excluding Chile) 2% 3% 2% 2%
Asia and Others 34% 27% 40% 37%

 

SQM sells iodine through its own worldwide network of representative offices and through its sales, support, and distribution affiliates. SQM maintains inventories of iodine at its facilities throughout the world to facilitate prompt delivery to customers. Iodine sales are made pursuant to spot purchase orders or within the framework of supply agreements. Supply agreements generally specify annual minimum and maximum purchase commitments, and prices are adjusted periodically, according to prevailing market prices.

 

16.1.4Iodine Competition

 

The world’s main iodine producers are based in Chile, Japan, and the United States. Iodine is also produced in Russia, Turkmenistan, Azerbaijan, Indonesia, and China.

 

Iodine is produced in Chile using a unique mineral known as caliche ore, whereas in Japan, the United States, Russia, Turkmenistan, Azerbaijan, and Indonesia, producers extract iodine from underground brines that are mainly obtained together with the extraction of natural gas and petroleum. In China, iodine is extracted from seaweed.

 

Five Chilean companies accounted for approximately 58% of total global sales of iodine in 2021, including SQM, with approximately 31%, and four other producers accounting for the remaining 27%. The other Chilean producers are Atacama Chemical S.A. (Cosayach), controlled by the Chilean holding company Inverraz S.A.; ACF Minera S.A., owned by the Chilean Urruticoechea family; Algorta Norte S.A., a joint venture between ACF Minera S.A. and Toyota Tsusho; and Atacama Minerals, which is owned by Chinese company Tewoo.

 

We estimate that eight Japanese iodine producers accounted for approximately 27% of global iodine sales in 2021, including recycled iodine. We estimate that iodine producers in the United States accounted for nearly 5% of world iodine sales in 2021.

 

SQM TRS Nueva Victoria Pag. 211

 

 

 

Iodine recycling is a growing trend worldwide. Several producers have recycling facilities where they recover iodine and iodine derivatives from iodine waste streams.

  

We estimate the 17% of the iodine supply comes from iodine recycling. SQM, through ASG or alone, is also actively involved in the iodine recycling business using iodinated side streams from a variety of chemical processes in Europe and the United States.

 

The prices of iodine and iodine derivative products are determined by market conditions. World iodine prices vary depending upon, among other things, the relationship between supply and demand at any given time. Iodine supply varies primarily because of the production levels of the iodine producers and their respective business strategies.

 

Our annual average iodine sales prices increased to approximately 36 USD/kg in 2021, from the average sales prices of approximately 35 USD/kg observed in 2020. During the first half of 2021, the price remained like 2020. However, in the second half of the year, the growth in demand and the challenging international logistics situation led to a gradual increase in prices.

 

Demand for iodine varies depending upon overall levels of economic activity and the level of demand in the medical, pharmaceutical, industrial, and other sectors that are the main users of iodine and iodine derivative products. Certain substitutes for iodine are available for certain applications, such as antiseptics and disinfectants, which could represent a cost-effective alternative to iodine depending on prevailing prices. The main factors of competition in the sale of iodine and iodine derivative products are reliability, price, quality, customer service and the price and availability of substitutes. We believe we have competitive advantages compared to other producers due to the size and quality of our mining reserves and the available production capacity. We believe our iodine is competitive with that produced by other manufacturers in certain advanced industrial processes. We also believe we benefit competitively from the long-term relationships we have established with our largest customers.

 

Demand for iodine varies depending upon overall levels of economic activity and the level of demand in the medical, pharmaceutical, industrial, and other sectors that are the main users of iodine and iodine-derivative products. Certain substitutes for iodine are available for certain applications, such as antiseptics and disinfectants, which could represent a cost-effective alternative to iodine depending on prevailing prices. Demand for iodine varies depending upon overall levels of economic activity and the level of demand in the medical, pharmaceutical, industrial, and other sectors that are the main users of iodine and iodine-derivative products. Certain substitutes for iodine are available for certain applications, such as antiseptics and disinfectants, which could represent a cost-effective alternative to iodine depending on prevailing prices.

 

The main factors of competition in the sale of iodine and iodine derivative products are reliability, price, quality, customer service and the price and availability of substitutes. SQM has competitive advantages over other producers due to the size and quality of its mineral reserves and the production capacity available. Iodine is competitive with that produced by other manufacturers in certain advanced industrial processes. SQM also benefits from the long-term relationships it has established with its main clients.

  

SQM TRS Nueva Victoria Pag. 212

 

 

 

 

Nitrates

 

Nitrates are obtained in Chile from the exploitation of the fields of nitrates that are in a strip of approximately 700 km long by 30-50 km wide, which is in the north of Chile, to the east of the Cordillera de la Costa, in the regions of Tarapacá and Antofagasta. This is the only area in the world where nitrate deposits have reserves and resources with economic content, where it is feasible to obtain different products such as nitrate sodium, potassium nitrate, iodine, and sodium sulfate. Its ore, called caliche, is presented preferably as a dense, hard surface layer of salt-cemented sands and gravels, with variable thicknesses between 0.5 m to 5 m.

 

The caliche resources and reserves estimated by SERNAGEOMIN for the year 2007, amounted to 2,459 million tons with an average grade of 6.3% nitrates. In turn, SQM reports that its total reserves amount to 1,378 million tons of caliche with an average grade of 6.29% of nitrates, this is 56% of national total.

 

Nitrates, in general, are considered specialty fertilizers because they are applied in a relatively narrow range of crops where it is possible to obtain higher yields and better products in their crops compared to massive fertilizers (urea and others).

 

Of these, potassium nitrate is today the main nitric fertilizer due to the combination of two primary nutrients, Nitrogen (N) and Potassium (K). Other nitric fertilizers are nitrate of sodium, ammonium nitrate and calcium nitrate. Nitrates explain less than 1% of the world market for nitrogenous fertilizers.

 

The most relevant crops for the potassium nitrate market are fruits, vines, citrus, tobacco, cotton, and vegetables, where higher yields and specific benefits are achieved such as improvements in color, flavor, skin strength, disease resistance, etc.

 

Potassium nitrate competes favorably against ammoniacal fertilizers in Market niches indicated Its greatest advantage is the solubility and speed of assimilation by the plants. These properties have been keyed to gaining a solid position in the applications of drip irrigation and foliar fertilization that are applied in specialty crops and higher value, is that is, those that clearly bear the highest cost of this type of fertilizer.

 

In addition, sodium nitrate, historically recognized in the international market as "Salitre de Chile", fulfills functions like potassium nitrate, although the functionality of the sodium is more limited. For this reason, it has been losing importance to the benefit of potassium nitrate.

 

For some applications, a more balanced dose of sodium and potassium is required, therefore that "potassium-sodium" is especially elaborated, which corresponds to a mixture of 67% by weight of sodium nitrate and 33% potassium nitrate.

 

Additionally, nitrates can be modified by adding other functional nutrients, such as phosphorus, sulfur, boron, magnesium, silicon, etc., seeking to enhance certain fertilizer properties for more specific crops. These products fall into the range of fertilizer mixtures.

  

SQM TRS Nueva Victoria Pag. 213

 

 

 

 

Sodium and potassium nitrates also have industrial applications based on their chemical properties.

 

The alkaline oxides of sodium and potassium (Na2O and K2O) give it properties to melt and source of sodium or potassium, required in the special glass industry. The nitrate, for its composition rich in oxygen, strengthens the oxidizing properties. Its main applications industrial are found in high-resolution glasses for TV screens and computers, ceramics, explosives, charcoal briquettes, metal treatment and various chemical processes as a powerful industrial oxidant.

 

It is relevant to mention the great growth potential of the application of nitrates in solar thermal installations, where it plays the role of a heat accumulator that allows capturing the solar energy in the day and release heat at night to allow almost continuous operation of power generation plants. The most efficient solar salt for this purpose is a mixture of 60% by weight of sodium nitrate and 40% of potassium nitrate.

 

In Chile, the main companies producing nitrate are SQM, Cosayach and ACF. However, it is estimated that SQM produces close to 92% of the nitrates produced in Chile.

 

The following figure shows the evolution of the production of nitrates in Chile, from 1996 to 2021.

 

Figure 16-2. Evolution of the production of nitrates in Chile, 1996-2021

 

 

 

Source: Chilean Copper Commission Non-Metallic Mining Statistics.

 

SQM TRS Nueva Victoria Pag. 214

 

 

 

In 2021, SQM supplies approximately 830.000 1,000,000 tons of nitrates to the SQM market.

 

It is estimated that the Chilean participation in the potassium nitrate market is between 49% and 55% of world sales. It should be noted that Chilean natural nitrates, although unique in nature, must compete on the international market with similar products of synthetic origin, produced mainly in Israel, Jordan, and China.

 

The price of nitrates has varied from 241 USD/ton registered in 2003, reaching 400 USD/ton in 2006 and 2007, and stabilizing between 650 USD to 900 USD in the period 2009-2019. In 2021 the price for Specialty Plant Nutrition was on average 792 USD/ton and for Industrial Chemicals it was 753 USD/ton.

 

In 2022, it is estimated that the demand for potassium nitrate decreased by 15%, as its average price rose to around 1,450 USD/ton.

 

16.1.5Specialty Plant Nutrition, Market, Competition, Products, Customers

 

In 2021, SQM's revenues from the sale of specialty plant nutrients was US$909 million, representing 32% of the total revenues for that year.

 

Specialty Plant Nutrients are premium fertilizers that allow farmers to improve their yields and the quality of certain crops.

 

SQM produces four main types of specialty plant nutrients that offer nutritional solutions for fertigation, soil, and foliar applications: potassium nitrate, sodium nitrate, sodium potassium nitrate and specialty blends.

 

In addition, SQM markets other specialty fertilizers including third-party products.

 

All these products are commercialized in solid or liquid form, for use mainly in high-value crops such as fruits, flowers, and certain vegetables.

 

These fertilizers are widely used in crops using modern farming techniques such as hydroponics, greenhouses, foliar-applied crops, and fertigation (in the latter case, the fertilizer is dissolved in water before irrigation).

 

Specialty plant nutrients have certain advantages over commodity fertilizers. Such advantages include rapid and effective absorption (no need for nitrification), higher water solubility, alkaline pH (which reduces soil acidity), and low chloride content.

 

One of the most important products in the field of specialty plant nutrients is potassium nitrate, which is available in crystallized and granulated (prilled) form, which allows different application methods. Crystalline potassium nitrate products are ideal for application by fertigation and foliar applications. Potassium Nitrate Granules are suitable for direct use in soil.

 

SQM has developed brands for marketing according to the different applications and uses of the products. The main brands are: UltrasolR (fertigation), QropR (soil application), SpeedfolR (foliar application) and AllganicR (organic agriculture).

 

SQM TRS Nueva Victoria Pag. 215

 

 

 

The new needs of more sophisticated customers demand that the industry provide integrated solutions rather than individual products. The products, including customized specialty blends that meet specific needs along with the agronomic service provided, allow to create plant nutrition solutions that add value to crops through higher yields and better-quality production.

 

Because SQM products come from natural nitrate deposits or natural potassium brines, they have certain advantages over synthetically produced fertilizers.

 

One of these advantages is the presence in the products of certain beneficial micronutrients, valued by those customers who prefer products of natural origin.

 

As a result, specialty plant nutrients are sold at a premium price compared to commodity fertilizers.

 

SQM's strategy in the specialty plant nutrition business is:

 

i.Leverage (take) the advantages of the specialty products over commodity-type fertilizers.

 

ii.Selectively expanding the business by increasing sales of higher-margin specialty plant nutrients based on potassium and natural nitrates, particularly soluble potassium nitrate and specialty blends.

 

iii.Pursue (seek) investment opportunities in complementary businesses to enhance (improve) the product portfolio, increase production, reduce costs, and add value to the marketing of the products.

 

iv.Develop new specialty nutrient blends produced at the mixing plants that are strategically located in or near the principal markets to meet specific customer needs.

 

v.Focus primarily on the markets where SQM can sell plant nutrients in soluble and foliar applications to establish a leadership position.

 

vi.Further develop the global distribution and marketing system directly and through strategic alliances with other producers and global or local distributors.

 

vii.Reduce production costs through improved processes and higher labor productivity to compete more effectively.

 

viii.Supply a product with consistent quality according to the specific requirements of customers.

 

SQM TRS Nueva Victoria Pag. 216

 

 

 

Specialty plant Nutrition: Market

 

The target market for the specialty plant nutrients includes producers of high-value crops such as vegetables, fruits, industrial crops, flowers, cotton and others. Furthermore, SQM sells specialty plant nutrients to producers of chloride-sensitive crops.

 

Since 1990, the international market for specialty plant nutrients has grown at a faster rate than the international market for commodity-type fertilizers. This is mainly due to:

 

i.The application of new agricultural technologies such as fertigation, hydroponics, and greenhouses.

 

ii.The increase in the cost of land and the scarcity of water, which has forced farmers to improve their yields and reduce water use.

 

iii.The increase in the demand for higher quality crops.

 

Over the last ten years the compound annual growth rate for per capita vegetable production was 3% while the same rate for the world population was close to 1%.

 

The global scarcity of water and arable land is driving the development of new agricultural techniques to maximize the use of these resources. An example of this is the more efficient use of water. While total irrigation has grown at an annual average of 1% over the last 20 years (like population growth), micro-irrigation (more efficient in water use) has grown by 10% per year in the same period. Micro-irrigation systems, which include drip irrigation and micro-sprinklers, are the most efficient forms of technical irrigation. These applications require fully water-soluble plant nutrients. The specialty nitrate-based plant nutrients are fully water soluble and provide nitric nitrogen, which allows faster nutrient uptake by the crop than when using urea or ammonium-based fertilizers. This facilitates the efficiency in the consumption of nutrients in the plant and, therefore, increases the yield of the harvest and improves its quality.

 

The lowest global share of hectares under micro-irrigation over total irrigated hectares is recorded in Asia with a figure of around 3%. This means that there is a high potential for the introduction of this technology in the region in the next years.

 

China is an important market for potassium nitrate, however agricultural demand for this product is largely met by local producers. The demand for potassium nitrate in the Asian country reaches approximately 400,000 to 420,000 metric tons, of which approximately 130,000 metric tons are linked to the tobacco industry and approximately another 120,000 metric tons are related to horticulture.

 

Specialty plant Nutrition: Products

 

Potassium nitrate, and specialty blends are higher margin products that use sodium nitrate as a feedstock. These products can be manufactured in crystallized or prilled form. Specialty blends are produced using the company’s own specialty plant nutrients and other components at blending plants operated by the Company or its affiliates and related companies in Brazil, Chile, China, Spain, the United States, the Netherlands, Italy, Mexico, Peru, and South Africa.

 

SQM TRS Nueva Victoria Pag. 217

 

 

 

The following table shows sales volumes and revenue for specialty plant nutrients for 2021, 2020 and 2019:

 

Table 16-4 Sales Volumes and Revenue for Specialty Plant Nutrients, 2021, 2020, 2019, 2018

 

Sales Volumes

(Thousands of Metric Tons)

2021 2020 2019 2018
Sodium Nitrate 32.0 25.6 30.2 25
Potassium Nitrate and Sodium Potassium Nitrate 640.3 572.2 617.4 373.4
Specialty blends 305.5 271.3 238.9 242.5
Blended Nutrients and other Specialty
Plant Nutrients
168.3 164.4 155.3 141.6

Total Revenues

(In US$ millions)

909 701.7 723.9 781.8

 

In 2021, SQM's revenues from the sale of specialty plant nutrients increased to US$909 million, representing 32% of the total revenues for that year and 29% more than US$702 million for sales of the previous year. Average prices during 2021 were up approximately 17%.

 

It is estimated that SQM's sales volume of potassium nitrate marketed during 2021 represented close to 52% of the total potassium nitrate marketed in the world for all its applications (including agricultural use). During 2021, the agricultural potassium nitrate market increased approximately 4% when compared to 2020. These estimates do not include potassium nitrate produced and sold locally in China, only Chinese net imports and exports.

 

Depending on the application systems used to deliver specialty nutrients, fertilizers can be classified as granular (also known as “SFF” or Specialty Field Fertilizer) or soluble (also known as “WSF” or Water-soluble fertilizer).

 

Granulated specialty nutrients are those for direct application to the soil, either manually or mechanized, which have the characteristics of high solubility, are free of chloride and do not present acid reactions, which makes them especially recommended for crops of tobacco, potatoes, coffee, cotton and for various fruit trees and vegetables.

 

In the soluble line, all those specialty nutrients that are incorporated into technician irrigation systems are considered. Due to the high-tech characteristics of these systems, the products used must be highly soluble, highly nutritional, free of impurities and insoluble particles, and with a low salt index. Potassium nitrate stands out in this segment, which, due to its optimal balance of nitric nitrogen and chloride-free potassium (the two macronutrients most required by plants), becomes an irreplaceable source for crop nutrition under technical irrigation systems.

 

Potassium nitrate is widely known to be a vital component in foliar applications, where it is recommended to prevent nutritional deficiencies before the appearance of the first symptoms, to correct deficiencies and increase resistance to pests and diseases, to prevent stress situations and promote a good balance of fruits and/or plant growth along with its development, especially in crops affected by physiological disorders.

 

SQM TRS Nueva Victoria Pag. 218

 

 

 

Specialty Plant Nutrition: Marketing and Customers

 

In 2021, SQM sold specialty plant nutrients in approximately 101 countries and to more than 1.300 customers. No customer represented more than 10% of specialty plant nutrition revenues during 2021, and the ten largest customers accounted in the aggregate for approximately 22% of revenues during that period. No supplier accounted for more than 10% of the costs of sales for this business line.

 

The following table shows the geographical breakdown of the sales:

 

Table 16-5 Geographical Breakdown of the Sales

 

Sales Breakdown 2021 2020 2019 2018
North America 35% 35% 34% 31%
Europe 20% 21% 21% 26%
Chile 14% 14% 15% 14%
Central and South America (excluding Chile) 10% 10% 11% 10%
Asia and Others 19% 20% 20% 19%

 

SQM sells specialty plant nutrition products worldwide mainly through its own global network of sales offices and distributors.

 

Specialty Plant Nutrition: Competition

 

The main competitive factors in potassium nitrate sales are product quality, customer service, location, logistics, agronomic expertise, and price.

 

SQM is the largest producer of sodium nitrate and potassium nitrate for agricultural use in the world.

 

Sodium nitrate products compete indirectly with specialty substitutes and other commodities, which may be used by some customers instead of sodium nitrate depending on the type of soil and crop to which the product will be applied. Such substitute products include calcium nitrate, ammonium nitrate and calcium ammonium nitrate.

 

In the potassium nitrate market, SQM´s largest competitor is Haifa Chemicals Ltd. (“Haifa”), in Israel, which is a subsidiary of Trans Resources International Inc. It is estimate that sales of potassium nitrate by Haifa accounted for approximately 17% of total world sales during 2021 (excluding sales by Chinese producers to the domestic Chinese market). SQM's sales represented approximately 52% of global potassium nitrate sales by volume for the period.

 

ACF, another Chilean producer, mainly oriented to iodine production, has been producing potassium nitrate from caliche and potassium chloride since 2005.

 

Kemapco, a Jordanian producer owned by Arab Potash, produces potassium nitrate in a plant located close to the Port of Aqaba, Jordan.

 

SQM TRS Nueva Victoria Pag. 219

 

 

 

In addition, there are several potassium nitrate producers in China, the largest of which are Yuantong and Migao. Most of the Chinese production is consumed by the Chinese domestic market.

 

In Chile, the products mainly compete with imported fertilizer blends that use calcium ammonium nitrate or potassium magnesium sulfate. Specialty plant nutrients also compete indirectly with lower-priced synthetic commodity-type fertilizers such as ammonia and urea, which are produced by many producers in a highly price-competitive market. Products compete based on advantages that make them more suitable for certain applications as described above.

 

16.1.6Industrial Chemicals, Market, Competition, Products, Customers

 

In 2021, the SQM´s revenues from Industrial Chemicals sales amounted to US$132 million, representing 4.7% of the total revenues for that year.

 

SQM produces and markets three industrial chemicals: sodium nitrate, potassium nitrate and potassium chloride.

 

Sodium nitrate is mainly used in the production of glass and explosives, in metal treatments, metal recycling and the production of insulating materials, among others.

 

Potassium nitrate is used as a raw material to produce frits for ceramic and metal surfaces, in the production of special glasses, in the enamel industry, metal treatment and pyrotechnics.

 

Solar salts, a combination of potassium nitrate and sodium nitrate, are used as a thermal storage medium in concentrated solar power plants.

 

Potassium chloride is a basic chemical used to produce potassium hydroxide, and it is also used as an additive in oil drilling as well as in food processing, among other uses.

 

In addition to producing sodium and potassium nitrate for agricultural applications, SQM produces different grades of these products, including prilled grades, for industrial applications. The grades differ mainly in their chemical purity.

 

At SQM there is some operational flexibility in the production of industrial nitrates because they are produced from the same process as their equivalent agricultural grades, needing only an additional step of purification.

 

SQM, with certain constraints, shift production from one grade to the other depending on market conditions. This flexibility allows to maximize yields and to reduce commercial risk.

 

In addition to producing industrial nitrates, SQM produces, markets, and sells industrial potassium chloride.

 

SQM TRS Nueva Victoria Pag. 220

 

 

 

The strategy in industrial chemical business is to:

 

(i)Maintain the leadership position in the industrial nitrates market.

 

(ii)Encourage demand growth in different applications as well as exploring new potential applications.

 

(iii)Reliable supplier for the thermal storage industry, maintaining close relationships with R&D programs and industrial initiatives.

 

(iv)Reduce production costs through improved processes and higher productivity to compete more effectively.

 

(v)Supply a product with consistent quality according to the requirements of the customers.

 

Industrial Chemicals Market

 

Industrial sodium and potassium nitrates are used in a wide range of industrial applications, including the production of glass, ceramics and explosives, metal recycling, insulation materials, metal treatments, thermal solar and various chemical processes.

 

In addition, this product line has also experienced growth from the use of industrial nitrates as thermal storage in concentrated solar power plants (commonly known as “concentrated solar power” or “CSP”). Solar salts for this specific application contain a blend of 60% sodium nitrate and 40% potassium nitrate by weight ratio and are used as a storage and heat transfer medium. Unlike traditional photovoltaic plants, these new plants use a “thermal battery” that contains molten sodium nitrate and potassium nitrate, which store the heat collected during the day. The salts are heated up during the day, while the plants are operating under direct sunlight, and at night they release the solar energy that they have captured, allowing the plants to operate even during hours of darkness. Depending on the power plant technology, solar salts are also used as a heat transfer fluid in the plant system and thereby make CSP plants even more efficient, increasing their output and reducing the Levelized Cost of Electricity (LCOE).

 

A growing trend for the CSP application is seen because of its economical long duration electricity storage. The thermal storage of CSP plants helps to improve the stabilization of the electricity grid. Like all large power generation plants, such large CSP power plants are capital intensive and require a relatively long development period.

 

We supply solar salts to CSP projects around the world. In 2021, we sold approximately 100,000 metric tons of solar salts to supply a CSP project in the Middle East. We expect to supply over 400,000 metric tons to this project between 2020-2022. In addition, there are several major solar salt and Carnot Battery projects currently under development worldwide that we believe we could supply between 2022-2025. There is also a growing interest in using solar salts in thermal storage solutions not related to CSP technology. Due to their proven performance, solar salts are being tested in industrial heat processes and heat waste solutions. These new applications may open new opportunities for solar salts uses soon, such as retrofitting coal plants.

 

SQM TRS Nueva Victoria Pag. 221

 

 

 

Industrial Chemicals Products

 

Revenues for industrial chemicals decreased to US$132 million in 2021 from US$161 million in 2020, because of lower sales volumes in this business line. Sales volumes in 2021 decreased 22.0% compared to sales volumes reported last year.

 

The following table shows the sales volumes of industrial chemicals and total revenues for 2021, 2020, 2019 and 2018:

 

Table 16-6 Sales Volumes of Industrial Chemicals and Total Revenues for 2021, 2020, 2019 and 2018

 

Sales Volumes

(Thousands of Metric Tons)

2021 2020 2019 2018
Industrial Chemicals 173.4 225.1 123.5 135.9

Total Revenues

(In US$ millions)

132 160.6 94.9 108.3

 

Industrial Chemicals: Marketing and Customers

 

In 2021 SQM sold industrial nitrate products in 59 countries to 338 customers. One customer accounted for more than 10% of SQM´s revenues of industrial chemicals in 2021, accounting for approximately 51%, and the ten largest customers accounted in the aggregate for approximately 61% of such revenues.

 

No supplier accounted for more than 10% of the cost of sales of this business line. SQM makes lease payments to CORFO which are associated with the sale of different products produced in the Salar de Atacama, including lithium carbonate, lithium hydroxide and potassium chloride.

 

The following table shows the geographical breakdown of the revenues for 2021,2020, 2019 and 2018:

 

Table 16-7 Geographical Breakdown of the Revenues

 

Sales breakdown 2021 2020 2019 2018
North America 23% 15% 29% 25%
Europe 15% 7% 16% 16%
Chile 1% 3% 42% 4%
Central and South America (excluding Chile) 6% 3% 7% 11%
Asia and Others 56% 72% 6% 43%

 

SQM´s industrial chemical products are marketed mainly through its own network of offices, representatives, and distributors. SQM maintains updated inventories of the stocks of sodium nitrate and potassium nitrate, classified according to graduation, to facilitate prompt dispatch from its warehouses. SQM provides support to its customers and continuously work with them to develop new products and applications for its products.

 

SQM TRS Nueva Victoria Pag. 222

 

 

 

Industrial Chemicals Competition

 

SQM is one of the world's largest producers of industrial sodium nitrate and potassium nitrate. In 2021, SQM's estimated market share by volume for industrial potassium nitrate was 61% and for industrial sodium nitrate was 43% (excluding domestic demand in China and India).

 

The competitors are mainly based in Europe and Asia, producing sodium nitrate as a by-product of other production processes. In refined grade sodium nitrate, BASF AG, a German corporation, and several producers in China and Eastern Europe are highly competitive. They produce industrial sodium nitrate as a by-product of other production processes.

 

SQM´s industrial sodium nitrate products also compete indirectly with substitute chemicals, including sodium carbonate, sodium sulfate, calcium nitrate and ammonium nitrate, which may be used in certain applications instead of sodium nitrate and are available from many producers worldwide.

 

The main competitor in the industrial potassium nitrate business is Haifa, which had a market share of 10% for 2020. SQM's market share was approximately 61% for 2021. Other competitors are mainly based in China.

 

Producers of industrial sodium nitrate and industrial potassium nitrate compete in the marketplace based on attributes such as product quality, delivery reliability, price, and customer service. SQM´s operation offers both products at high quality and with low cost. In addition, SQM´s operation is flexible, allowing to produce industrial or agricultural nitrates, maximizing the yields, and reducing commercial risk. In addition, with certain restrictions, SQM can adapt production from one grade to another depending on market needs.

 

In the potassium chloride market, SQM is a relatively small producer, mainly focused on supplying regional needs.

 

Pricing Estimates

 

The QP has determined that using 40.0 USD/kg for iodine at the port of Tocopilla is the appropriate price for this study. Nitrates are more complicated since various products are produced based on market conditions, however the QP has determined that an appropriate average price for nitrates at Tocopilla is $US820. The derivation of a price for delivery of nitrates for refining in Coya Sur is detailed in Section 19.

 

SQM TRS Nueva Victoria Pag. 223

 

 

 

17Environmental Studies, Permitting and Social or Community Impact

 

The following section details the regulatory environment of the Project. It presents the applicable laws and regulations and lists the permits that will be needed to begin the mining operations. The environmental Assessment process requires that data be gathered on many components and consultations be held to inform the Project relevant stakeholders. The main results of this inventory and consultation process are also documented in this section. The design criteria for the water and mining waste infrastructure are also outlined. Finally, the general outline of the mine’s rehabilitation plan is presented to the extent of the information available now.

 

Environmental Studies

 

The Law 19,300/1994 General Bases of the Environment (Law 19,300 or Environmental Law), its amendment by Law 20.417/2010 and Supreme Decree N°40/2012 Regulation of the Environmental Impact Assessment Service regulations (DS N°40/2012 or RSEIA)) determines how projects that generate some type of environmental impact must be developed, operated, and closed. Regarding mining projects, the art. 3.i of the Environmental Law defines that mining project must be submitted to the Environmental Impact Assessment System (SEIA) before being developed.

 

The Nueva Victoria project, which includes the “Pampa Hermosa” and “Tente en el Aire” projects, has been submitted to the Environmental Impact Assessment System (SEIA) a total of 13 times, on account of the following projects:

 

Salar Sur Viejo Groundwater Extraction Project presented through DIA and approved by RCA 036/ 1997

 

Draft loopholes submitted by EIA and approved by RCA N° 058/1997

 

Nueva Victoria extension presented through a DIA and approved by RCA N° 0163/2005)

 

Draft Adduction Call presented through DIA and approved by RCA N° 032/ 2005)

 

Nueva Victoria Sur Mine presented through DIA and approved by RCA N° 0173/ 2006.

 

Modification of Nueva Victoria Yoduro Plant presented by DIA and approved by RCA N° 094/2007

 

Incorporation of Chlorine in Nueva Victoria Iodine Plant presented by DIA and approved by RCA N°070/2008)

 

Update Operation Nueva Victoria presented through DIA and approved by RCA N°124/2008.

 

Nueva Victoria Mine Area submitted through an EIA and approved by RCA N°042/2008)

 

Evaporation Iris Pipeline and Pools presented through a DIA and approved by RCA N° 061/ 2009.

 

Pampa Hermosa Project presented through an EIA and approved by RCA N° 890/2010

 

Expansion of Nueva Victoria South Mine Zone presented through by DIA and approved by RCA N°076/ 2012.

 

Tente en el Aire presented by EIA and approved by RCA N° 20210100112/2021

 

SQM TRS Nueva Victoria Pag. 224

 

 

 

In addition, an Environmental Impact Study (EIA), "Partial modification of the reinjection system in the Llamara Púquios", was submitted to the SEIA on July 17, 2020, and is in process of being qualified.

 

Recently, the Environmental Impact Statement (EIS) Project was also entered: "Adaptation of the seawater pipeline and complementary works Nueva Victoria". The Project corresponds to a modification of the mining project "Tente en el Aire" (TEA), approved by RCA No. 20210100112/2021. To this end, the modification of the route of the seawater supply and associated works are considered, together with the incorporation of an access road from Route A-750, in the Costa area; And in the Pampa area, the incorporation of a SE Sectioning Machine and complementary works, such as an LTE 66 kV and SE 10 MVa.

 

The Project, which entered the Environmental Impact Assessment System (SEIA), in September 2022, is in the process of responding to its Addendum 1 and consolidated observations generated by the Citizen Participation Process (PAC) which was requested by the communities.

 

Given the above, and in case of having the approval and conformity by the authority of the response process and the Addendum 1 and CAP Annex documents, it is expected to have a favorable environmental qualification resolution (RCA), in 2023.

 

17.1.1Baseline studies

 

Each time the project has been submitted to the SEIA; baseline environmental studies have been carried out. The last Environmental Impact Study (EIA) approved by RCA N° 20210100112/2021 included the following environmental baseline studies.

 

The following is a more detailed analysis of certain components of the baseline:

 

Hydrology

 

As for the hydrology of the site, the average annual rainfall has a value of less than 2 mm in recent years, with many years with zero precipitation. The maximum 24 hour recorded in the area is less than 10 mm, with historical maximums fluctuating between 3 and 7 mm. There are no permanent surface runoff channels, with sporadic runoff associated with extreme precipitation events. It is estimated that the streams of the sectors are able to contain the runoff generated by these extreme precipitation events.

 

Hydrogeology

 

In the area of influence of the project, groundwater rights have been granted for 41 wells. All are consumptive, permanent, and continuous.

 

In the area of influence, there are four distinct hydrogeological units: A1, A3, C5 and D1 (IMAGE). Units A have a high hydrogeological potential to store and transmit water, C has a low potential and D has no potential.

 

Unit D1 corresponds to compact to slightly fractured/altered andesites, and locally fractured/altered diorites without water content. Its potential is nonexistent because it does not receive any recharge due to its position.

 

SQM TRS Nueva Victoria Pag. 225

 

 

 

 

Unit C5 corresponds to sandy-clayey gravels intercalated with sands, clays and silts, without water content. It has a low to null recharge due to precipitation at the site.

 

Unit A3 corresponds to evaporite deposits hosted in the western sector of the Pampa del Tamarugal. It has a medium to high water transmissivity.

 

Unit A1 corresponds to sands and gravels with low consolidation, which form active deposits mainly in the central basin. It has a medium to high water transmissivity, with a maximum value of 4,280 m2/day.

 

According to the study, there is no evidence of the existence of water under the area of the planned works in the coastal mountain range. To the northwest and southwest of the planned works there are local basins with groundwater. To the east, groundwater belonging to the Pampa del Tamarugal aquifer can be observed. To the north of the works, in the Soronal salt flat, there is groundwater with a depth of between 0.8 and 19.6 m.

 

According to hydro chemical information, the water in the area corresponds to the chloride-sodium type.

 

SQM TRS Nueva Victoria Pag. 226

 

 

 

 

Figure 17-1. Location of Wells with Granted Water Rights

 

 

 

SQM TRS Nueva Victoria Pag. 227

 

 

 

Figure 17-2. Hydrogeologic Map of the Area of Background Collection

 

 

 

Soil

 

The soils present in the slaughter show very little edaphic development, mainly due to the extremely arid conditions of the site, which have limited the intensity of soil formation processes. Four different homogeneous soil units were defined, being "Depositional plains soils" the predominant one in the sector (76.6%).

 

The soil in the sector has a neutral to strongly alkaline pH; it is extremely saline, and strongly to extremely sodic. Soils with loam- sandy (Fa) and sandy- loam (aF) textures predominate. All these characteristics place all the sector's soils within use capacity VIII ("soils with no agricultural, livestock or forestry value, where their use is limited to wildlife, recreation or watershed protection").

 

The soil resource present in the slaughter not considered a scarce or unique resource within the region. In addition, it has a very low capacity to support biodiversity, which makes it an inhospitable habitat (absolute desert condition).

 

SQM TRS Nueva Victoria Pag. 228

 

 

 

Plants

 

As for the vegetation in influence of the project, the predominant vegetation type is "Prosopis Tamarugo plantation", covering 96.6% of the study area. It is followed by "Distichlis Spicata Meadow", with 1.9%; and the least represented is "Tillandsia Landbeckii Meadow", with 0.1%.

 

There is a preservation native forest formation around influence (vegetation type "Prosopis Tamarugo forest"); however, it is far from the area of direct intervention of the project. Only the intervention of floristic elements in the vegetation type "Tillandsia Landbeckii Meadow" is considered, which has no endemic species or species in conservation category.

 

With respect to the flora, 4 species were identified within the area of influence of the project, 2 belonging to the Magnoliopsida class and 2 to the Liliopsida class. There are 2 species classified in a conservation category: Prosopis Tamarugo (tamarugo), classified as endangered; and Prosopis Alba (Algarrobo Blanco), classified as out of danger. Both species are considered native. The area of influence is dominated by native and endemic species.

 

With respect to environmental singularities (1, according to the document "Guide for the Description of the area of influence, description of the Soil, Flora and Fauna Components of Terrestrial Ecosystems in the SEIA" (SEA, 2015)), Native Forest formations of Prosopis Tamarugo were detected, because it is a scarce area arid due to the presence of a species classified as Endangered; however, the project does not affect the habitat of Prosopis Tamarugo.

 

Wild Animals

 

38 native species were identified: 27 birds, 7 mammals and 4 reptiles.

 

18 species were identified in some state of conservation:

 

In danger: Black tern, little tern.

 

Vulnerable: Garuma Seagull, Nun Seagull, Humboldt Penguin, Guanay, Stolzmann's Dragon, Chungungo (detected exclusively in the Patillos Islote sector).

 

Near Threatened: Northern Mouse-Eared Bat.

 

Rare: Teresa's Corridor

 

Sufficiently known: Tamarugal Sebo-Eater, Lile;

 

Least Concern: Four-banded Racer, Booby, Common Sea Lion, Great Northern Gecko, Chilla Fox, Culpeo Fox.

 

Six Exotic species were detected: Dog, Donkey, Mule, Goat, hare and Guarén.

 

The coastal sector had the greatest richness of species, with 20 detected. This was followed by the Pampa del Tamarugal National Reserve sector, with 14 species, and then the pampas sector, with 9 species. In particular, the lesser tern was detected in the coastal sector (Chanavayita sector), with 7 adults and 5 active nests in the incubation stage. The black tern and other species of the family Procellaridae were detected only through carcasses, and no nesting sites were found. The Garuma gull was sighted in the coastal sector and in the pampas sector, with 9 sightings of adults and detection of isolated nesting events.

 

SQM TRS Nueva Victoria Pag. 229

 

 

 

Fungi and Lichens

 

No fungal species were detected in the study area. 36 species of lichens were detected, four of which are in a conservation category: Acarospora Altoandina and Acarospora Rhabarbarina, both in the Data Deficient category; and Acarospora Bullata and Polycauliona Ascendens in the Least Concern category.

 

Biological Oceanography

 

A marine baseline was conducted, taking as the study area (larger than the area of influence of the project) a sector of the Bay of Patillos and a sector north of Caleta Caramucho.

 

In the sampling period (winter 2017 to winter 2018) the number of identified phytoplankton taxa varied between 41 and 47; of Zooplankton varied between 24 and 68.

 

With respect to fish, 16 taxa were found, the most abundant being Burrito (C. crusma), Bilagay (C. variegatus) and Borrachilla (Scartichthys spp). The highest abundance of fish was observed in transects with rocky substrate.

 

Human Environment

 

For the definition of the area of influence of the project's human environment, the sectors that had some type of housing, productive and/or cultural use were considered. Accordingly, the settlements of Chanavayita, Caleta Cáñamo and Caramucho, corresponding to the Coast sector, and the settlements of Colonia Pintados and Victoria, corresponding to the Pampa sector, were considered.

 

SQM TRS Nueva Victoria Pag. 230

 

 

 

Figure 17-3. Sectors of the Area of Influence

 

 

 

SQM TRS Nueva Victoria Pag. 231

 

 

 

Cultural Heritage

 

In paleontological terms, the sector where the project is located has a low to medium potential. Most of the geological units of the sector did not present paleontological findings of interest during the survey; however, the Coastal Deposits Unit (PIHI) shows medium to high potential, having shown a finding of fossil pieces in the field, in addition to its characteristics.

 

Regarding archaeology, a survey found 3,017 heritage elements in influence of the project. They were classified into five categories: 761 point finds, 194 aerial type finds, 239 linear type finds, 71 lithic sites and 1,752 calicheros. The linear elements were mostly classified as roadways, totaling almost 410 km in length. Specific finds are divided into isolated finds, signaling structures, animal skeletons, and stone inscriptions. Regarding the time of the findings, 76% were dated as chronologically historical, with 5.5% dating from pre-Hispanic times.

 

17.1.2Environmental Impact Study

 

As for the Pampa Hermosa Project, based on the results of the EIA (Chapter 5), the activities of the project and their possible environmental impacts were analyzed. This made it possible to identify the environmental components that could be directly or indirectly affected during the different phases of the project and where they are located.

 

For those significant environmental impacts, management measures were designed to mitigate, repair, and compensate the relevant affected elements.

 

SQM TRS Nueva Victoria Pag. 232

 

 

 

The following table summarizes that information.

 

Table 17-1. Environmental Impacts of the Pampa Hermosa Project and Committed Measures

 

Impact Phase in
which it
occurs
Type of measure Measures
Decrease in surface water level in the Salar de Llamara ponds (púquios) Operation Mitigation Implementation of a hydraulic barrier: consist of injecting water between the pumping sector and the ponds, to induce an increase in the aquifer level so as to generate a water divide that isolates the hydraulic behavior of both sectors and prevent the cone of depression from spreading and affecting the water level of the ponds.
An Early Warning Plan "PAT" has been designed, which should be understood as an environmental management tool complementary to the implementation of the hydraulic barrier, i.e., the PAT would be activated if the hydraulic barrier runs the risk of not being efficient enough to meet the environmental objectives defined for the Púquios and hydromorphic vegetation.
The alteration of the vital state of natural Tamarugo formations and of the habitat for flora species in the Salar de Llamara Operation Mitigation Staggered groundwater withdrawal and the exclusion of groundwater withdrawal from the 45 l/s well TC-10.
An Early Warning Plan has been designed that contemplates the application of warning and recovery measures aimed at maintaining population vitality values, the main measures to be implemented being a) Irrigation of tamarugos during the Warning Phase and b) Reduction of pumping flow during the Recovery Phase.
Tamarugo recovery irrigation program: the purpose of this program would be to recover the vitality of the Tamarugo of the Salar de Llamara that could be affected by water stress due to the pumping of the Project. For this purpose, it is considered to irrigate specimens that are in regular or bad condition, according to the amount of Tamarugo that exceeds the threshold defined for the activation of the Tamarugo alert for a certain period. This measure will be linked to the Early Warning Plan of the Llamara Tamarugo System, consequently it will be implemented together with the actions of the Tamarugo alert and recovery phase, as appropriate.
The alteration of the livelihood systems of tenant ranchers who use the Pampa del Tamarugal National Reserve due to water extraction. Construction, operation, and closure Mitigation Change of well catchment point
Staggered water withdrawal
Tamarugo plant production program
Tamarugo planting program
Program to support phytosanitary control of Tamarugo trees
Program for sustainable management of tamarugo trees
Productive development program for cattle ranchers
SQM commits not to affect the livelihood systems of the Quillagua Community in the Quebrada Amarga sector; to maintain monthly contact with the leadership of the Community in order to monitor the generation of any situation related to the project in the sector and, in the event that the information provided by the leadership indicates any situation attributable to the project, the respective measures will be taken in order to maintain the commitment of not affecting; and submit an annual report to the competent authority on these contacts with the Quillagua leadership, the situations detected that are attributable to the project and the actions taken for such purposes.
The alteration of cultural heritage Construction, operation, and closure Mitigation An archaeological exclusion area will be created for the geoglyphs, lithic workshops, burial sites and recorded animites, where the application of mitigation measures focused on signage and fencing is proposed, to ensure their protection and safeguarding.
Compensation Materials recovered in the different compensation activities will have a definitive destination such as the Saltpeter Museum Corporation of Humberstone
Plan for the study, preservation, and enhancement of the Pintados Station

 

Source: own elaboration, based on information obtained from RCA N°890/2010

 

SQM TRS Nueva Victoria Pag. 233

 

 

 

The Pampa Hermosa Project is currently in a sanctioning process (Sanctioning File D-027-2016) for the infractions detected by the authority during 2016 in relation to the breach of certain commitments established in the Environmental Assessment Resolution (RCA 890/2010) of the project, mainly associated with water resources and their impact on environmental systems (public, tamarugos). Along these lines, in 2019 SQM presented an adequate plan to address this issue: a revised and corrected Environmental Compliance Program, which incorporates the observations made by the authority, complying with the contents and criteria established and legal requirements to ensure compliance with the requirements infringed.

 

PDC Approved on 02.26.2019 by Res. Ex N°24/Rol D-027-2016. and amended by Res. Ex. N°27/ Rol D-027-2016, 08.11.22.

 

This program establishes concrete actions to improve knowledge and follow-up of the environmental systems that make up the project, recognizes the role of the communities, and provides greater transparency in the monitoring of environmental variables. To date, 45 reports have been filed on the status of compliance with the Environmental Compliance Program and no new charges or economic sanctions have been filed. However, constant monitoring of established actions must be maintained.

 

It should be noted that the EIA "Partial modification of the reinjection system in the Llamara reservoirs", mentioned above, was presented as part of the commitment of this Compliance Program that the company presented. The project corresponds to a modification of the Pampa Hermosa project (RCA N°890/2010), geographically limited to the "Púquios Sector in Salar de Llamara", and its objective is to modify the mitigation measure of recital 7.1.1 of RCA N° 890/2010, which is oriented to minimize the secondary impacts that water extraction will have on biotic systems present in the area of influence of the project, allowing to maintain the surface levels of the ponds in such a way as not to affect the aquatic and terrestrial biota surrounding them. The project also pretends to modify the Phase I Alert Llamara Aquifer of the Early Warning Plan, as well as to strengthen the monitoring plan associated with the Púquios of Llamara.

 

As for the Tente en el Aire project, it aims to incorporate new mine areas into the "Nueva Victoria" mine to produce salts rich in iodide, iodine, and nitrate, which implies an increase in the total amount of caliche to be extracted, in the production of salts rich in iodide, iodine and nitrate and in the use of seawater for these processes.

 

SQM TRS Nueva Victoria Pag. 234

 

 

 

The environmental impacts of this project and the measures proposed by the company to mitigate, repair, or compensate those impacts are in the following table:

 

Table 17-2. Environmental Impacts of the Tente en el Aire Project and Committed Measures

 

Impact Phase in
which it
occurs
Type of measure Measures
Intervention of relevant nesting habitat for the nesting of the little tern Chanavayita Construction, operation, and closure Mitigation Construction outside the breeding season of the Little Tern and installation of an automatic noise monitoring station outside the nesting area.
Permanent environmental inspector during the construction phase
Relocation of works near the "Chanavayita" site: installation of work sites 1 and linear works.
Apply soundproofing measures during construction and operation: acoustic screens during construction and encapsulation of auxiliary pumping station during operation.
Compensation Management measures plan for the nesting site at the Chanavayita access: strengthen dog control at the municipal kennel; install allusive signage at the nesting site at the Chanavayita access; environmental education plan; and research program to characterize the habitat and reproductive dynamics of the little tern at the Chanavayita site.
Intervention of relevant nesting habitat for the nesting of sea swallows in the northern sector of the project. Construction, operation, and closure Mitigation Prohibition of construction during the swallow's breeding season.
Prohibition of mining exploitation during the operation phase
Prohibition of removal of facilities during the reproductive season
Extension of the protection buffer of the swallow nesting site "Pampa Hermosa".
Extension of the exclusion area and prohibition of mining activities in the "Pampa Hermosa" nesting site, because of the previous measure.
20m protection buffer around potential nesting sites with nesting records, close to the route of the project's linear works.
Compensation Compensation measure MC-4 "Protection of the Exclusion Area": the owner agrees not to explore or exploit this mining property or those in his name that are not included in the project; he agrees to require the constitution of encumbrances on the surface properties.
Alteration of archaeological cultural heritage Construction and operation Mitigation MM1- Induction lectures in Paleontology
MM2- Rescue of elements of paleontological interest and release of area (surface)
MM3- Ongoing paleontological monitoring during construction in coastal sector
  MM4- Creation of archaeological cultural heritage protection areas
  MM5- Permanent archaeological monitoring during construction
  MM6- Induction lectures in archeology
  Compensation MC1- Improvement or fitting out of the warehouse of the Saltpeter Museum Corporation for the conservation of cultural heritage pieces.
Alteration of paleontological cultural heritage MC2- Scientific-educational publication on local and regional paleontology.
MC3- Intensive archaeological survey and documentation
MC4- Protection of the exclusion area

 

Source: based on RCA N°20210100112/2021

 

SQM TRS Nueva Victoria Pag. 235

 

 

 

Operating and Post Closure Requirements and Plans

 

17.1.3Waste Disposal Requirements and Plans

 

During mining operations, two types of waste are generated. Mineral and non-mineral waste.

 

Mineral wastes

 

Mineral waste or mining residues refer in this case to inert salts are called waste salts. These salts are transported to certain areas for deposit, piling up on the ground in the form of cakes.

 

For this purpose, the Nueva Victoria site has the Sectoral Permit for the Collection of Discarded Salts presented and approved by the authority in accordance with current regulations (article 339 of Supreme Decree No. 132/2002, Mining Safety Regulations of the Ministry of Mining, for the establishment of a landfill.), additionally, it has the corresponding environmental authorization.

 

Currently, the discarded salts are deposited in stockpiles in the industrial zone of Sur Viejo (in an area of approximately 1,328 ha that also includes storage areas for the final product). However, in the Tente en el Aire project (environmentally approved in November 2021), which expands the current operation of Nueva Victoria, a new deposit is contemplated to dispose of the discarded salts from the evaporation pools and the waste of the neutralization process. This new tank will have an area of 360 ha in which material accumulation cakes up to 50 m high will be placed, resulting in an estimated total capacity of 102,500,000 tons (4,997,000 t/y of discard salts and 110,150 t/y of gypsum), to test the project “Waste dump corresponding to deposits of discarded salts, project Tente en el Aire" la Res. Ex 424/2022. These salts are neutral and pose no health risks as declared by the authority.

 

Regarding the management of these deposits, it should be noted that the hygroscopic properties of the salts that compose them favor compaction and subsequent cementation.

 

Given these characteristics (salts that form a crust and the level of final impregnation in brine of the residue of the neutralization process is approximately 20%), no emissions of particles or gases are generated.

 

Regarding the management of possible effluents, the new tank will have a perimeter drainage system, which will allow, on the one hand, the collection of the solutions resulting from the runoff or runoff generated by the impregnation solutions, which will be channeled to 4 collection ponds for later pumping to the evaporation ponds and on the other hand, The function of this drainage system will be the channeling of rainwater.

 

The waste salt deposits are committed to being monitored annually to verify that they are in accordance with the design variables and at the closure of the mine the discard salts and residues of the brine neutralization process will be maintained.

 

SQM TRS Nueva Victoria Pag. 236

 

 

 

Non-mineral waste

 

All types of waste can be classified as non-mineral waste, which in turn can be classified as Hazardous Waste and Non-Hazardous Waste according to the environmental and sectoral regulations in force in Chile.

 

Among the non-hazardous waste associated with this type of projects, we can mention solid waste assimilable to households, sludge from the wastewater treatment system, containers of non-hazardous inputs, non-hazardous discards, waste associated with maintenance and generated products of the actions carried out in contingencies, among others.

 

Hazardous waste (RESPEL) comes from process discards, used maintenance lubricating oil generated by changing equipment and machinery, batteries, paint residues, ink cartridges, fluorescent tubes, contaminated cleaning materials, among others.

 

The disposal of this type of waste has the current environmental and sectoral legal authorizations declared in section 17.3.

 

Additionally, the company in its 2020 Sustainable Development Plan contains a set of commitments, among which is to reduce the generation of industrial waste by 50% by 2025.

 

17.1.4Monitoring and Management Plan Established in the Environmental Authorization

 

The contents of the Environmental Monitoring Plan agreed for the implementation of the Pampa Hermosa project include: Project Phase, Environmental Components to be measured and controlled, Associated Environmental Impacts, Monitoring Plan, Measurement Methods or Procedures, Location of Monitoring Points, Parameters that are used to characterize the state and evolution of said component, Permitted or committed levels or limits, Duration and frequency of the monitoring plan according to the stage of the project, Delivery of Report with monitoring results, Indication of the competent body that would receive such documentation, and Location in the evaluation history.

 

The Hydrogeological Environmental Monitoring Plan of the "Pampa Hermosa" Project is the same Environmental Monitoring Plan (PSA) of the Aducción Llamara Project (committed by RCA No. 32/05 and modified according to Resolution No. 097/07). In this way, the commitments of the PSA Aducción Llamara will be incorporated into the PSA Pampa Hermosa.

 

For the implementation of the "Tente en el Aire" project, a monitoring plan for the different components was committed. This plan states the following:

 

Regarding the cultural heritage component the follow-up plan includes induction talks on paleontology; rescue of elements of paleontological interest and release of the area (surface); permanent paleontological monitoring during construction in the coastal sector; scientific-didactic publication on local and regional paleontology; creation of areas for the protection of archaeological cultural heritage; permanent archaeological monitoring during construction; induction talks on archaeology; and intensive archaeological prospection and documentation. Likewise, improvement or adaptation of the winery of the Saltpeter Museum Corporation for the conservation of pieces of cultural heritage.

 

SQM TRS Nueva Victoria Pag. 237

 

 

 

Regarding the wild animal component, the monitoring plan includes the exclusion of the mining area at tern nesting sites; modification of layout and establishment of precautionary areas in linear works at tern nesting sites; Chanavayita little tern nesting site; protection of the exclusion area; study of the ecology, phenology and ethology of the tern (Procellariformes: Hydrobatidae) in the Pampa Hermosa; research program on the increase of habitat use in the nesting site "Pampa Hermosa".

 

17.1.5Requirements and Plans for Water Management during Operations and After Closure

 

The extraction of water for the Nueva Victoria industrial operation is environmentally approved and totals 810 L/s, considering the use of 570.8 L/s of water approved in RCA 890/2010, a flow that is additional to the 120 L/s contemplated by the EIA “Lagunas” (RCA 58/1997) and the 120 L/s considered in the DIA “Extraction of Groundwater from Salar de Sur Viejo” (RCA 36/1997) and DIA “Expansion Nueva Victoria” (RCA 04/2005).

 

It should be noted that the last environmentally approved project (EIA "Tente en el Aire" - RCA 20210100112/2021), did not increase the projected freshwater requirement despite an increased rate of exploitation and processing of caliche, by relying on the use of 900 l/s of seawater.

 

The extraction is carried out from the 5 locations detailed in Table 17-3, located in the Salar de Sur Viejo, Salar de Llamara and the Pampa del Tamarugal (environmental protection area), comprising principally groundwater sources with a minor component of surface waters.

 

Table 17-3. Monthly Average Flow Period 2022 Nueva Victoria

 

Sur Viejo (l/s) Llamara (l/s) Iris (l/s) Soronal (l/s) CPC (l/s) Total flow (l/s)
103 203.8 60.4 126 122.8 616
17% 33% 10% 20% 20% 100%

 

Table 17-4 shows how the water resources are distributed among the different sectors of the Nueva Victoria operation.

 

Table 17-4. Distribution of Freshwater Consumption Between the Various Components of the Nueva Victoria Operation.

 

Pozas (l/s) Puquíos injection (l/s) Mine (l/s) Processing Plant (l/s) Camp (l/s) Leaching (l/s)
2.3% 4.6% 0.8% 1.3% 0.3% 90.7%

 

Information on water extraction n from natural sources is public, being reported to the Chilean Regulatory Authority through the reporting component of the Environmental Monitoring Plan (PES).

 

SQM TRS Nueva Victoria Pag. 238

 

 

 

The PES fulfills the objective of monitoring the ecosystems that may be affected by a project, thus guaranteeing their conservation and the permanence of the ecosystem services they provide. Hydrogeological reports include groundwater levels, hydro chemical quality of groundwater and surface water, and cumulative pumping rates and volumes from supply wells and surface water extraction points.

 

The PES also documents the mitigation measure of injecting water to generate a hydraulic barrier to protect the Púquios wetlands against the lowering of the water table associated with the extraction of groundwater from the Llamara aquifer. The chemical quality of the injected water is monitored to ensure that the hydrochemistry of groundwater in the Púquios wetlands is not adversely affected. SQM is currently seeking regulatory authority approval to modify this mitigation measure in relation to the period of water injection into the aquifer and the operational rule to ensure the protection of the wetland ecosystem.

 

As stablished in the update of the Closure Plan (Exempt Resolution 814/2022) of the Nueva Victoria site, the works or actions contemplated for closure in relation to water resources are the removal of metal structures, pipes, and equipment, disabling of pumping wells, removal of steel pipes, removal of power lines, removal of substations and removal of waste.

 

The EIA Modification of the Injection System (under evaluation by the regulatory authority) would contemplate prolonging the injection of water by 15 years in the closure stage with respect to what was initially considered in the EIA of Pampa Hermosa (8 years).

 

Environmental and sectorial permits status

 

The project has been submitted 13 times to the SEIA. In 9 cases the projects were submitted through Environmental Impact Statements (EIS) and in 4 cases through Environmental Impact Assessments (EIA) and in all cases the projects were authorized by the environmental authority. Chapter 17.1 contains the environmental authorization for each project.

 

Additionally, the Project required different sectorial permitting for operating. The following table shows the sectorial permits defined in each RCA as applicable to each project:

 

SQM TRS Nueva Victoria Pag. 239

 

 

 

Table 17-5. Sectorial Permits Defined in the Environmental Resolutions

 

Name of the Sectorial Permit (PAS) PAS Number Sectorial Approval Resolution
Permit to carry out research fishing 119 RCA 20210100112 approved by Resolution No. 20210100112/2021.
Permit for archaeological excavations 132 or Ex 76

RCA 042/2008.Approved by Resolution No. 5175/2012; 4531/2014; 1493/2015; 548/2020

RCA124/2008. Approved by Resolution No. 659/2009

RCA 890/2010. Approved by Resolution No. 5416/2010; 6164/2010; 568/2011; 149 0/2011; 3738/2011; 5802/2011; 6613/2011; 2974/2012; 3851/2012; 1947/2014; 3502/2015; 1950/2018; 3772/2021; 28 48/2020.

RCA 076/2012. Approved by Resolution No. 3885/2012

RCA 20210100112 Approved by Resolution No. 3395/2022 (paleontology); Resolution No. 5043/2022; 113/2023.

Permit for stockpiling mining waste 136 or EX 88

RCA 004/2005; RCA 173/2006; 042/2008; RCA 076/2012. Approved by Resolution No. 2552/2015, 2129/2020 (leaching piles); 2959/2016 (discarded stockpiles)

RCA 890/2010 Approved by Resolution No. 2129/2020 (lix batteries); 2959/2016; 1570/2020 (discarded stockpiles)

RCA 20210100112 approved by Resolution No. 424/2022. (discarded stock piles)

Approval of the mining closing plan 137

RCA 890/2010 Approved by Resolution No. 515/2012.

RCA (036/1997; 058/1997; 04/2005; 032/2005; 173/2006; 094/2007; 042/2008; 070/2008; 076/2012) Approved by Resolution No. 1858/2015.amended by Res. No. 2817/2015.

Resolution No. 814/2022, as amended by Res. No. 1511/2022 . (Update PdC. Includes ASD)

Permit for the construction, modification, and expansion of any public or private work for the evacuation, treatment, or final disposal of sewage water 138 or Ex 91

RCA 004/2005, Approved by Resolution No. 2543/2006

RCA 124/2008. Approved by Resolution No. 3428/2014

RCA 890/2010. Approved by Resolution No. 1970/2013; 3079/2011; 3427/2014; 339/2018.

Permit for the construction, modification, and expansion of any public or private facility for the evacuation, treatment, or final disposal of industrial or mining waste 139 Not requerid
Permit for the construction, modification and expansion of any garbage and waste treatment plant of any kind; or for the installation of any place for the accumulation, selection, industrialization, trade or final disposal of garbage and waste of any kind. 140 or Ex 93

RCA 004/2005. Approved by Resolution No . 1813/2006; 2167/2014

RCA 124/2008. Approved by Resolution No. 2547/2010.

RCA 890/2010. Approved by Resolution No. 1807/2016; 758/2018; 17581/2021; 2482/2019

Permit for the construction of a site for the storage of hazardous wastes 142 RCA 890/2010. Approved by Resolution No.  081/2018; 753/2018.
Permit for the hunting or capture of specimens of animals 146  RCA 20210100112  approved by Resolution No. 80/2022; -82/2022; -86/2022.
Permit for the construction of some hydraulic works 155 RCA 20210100112 Seawater pools. Approved by Res N°: Solar  evaporation ponds in process.
Permit for the modification of a watercourse 156 RCA 20210100112. Approved by Resolution N°. 139/2022
Permit to subdivide and urbanize rural land to complement an industrial activity with housing, to equip a rural sector, or to set up a spa or tourist camp; or for industrial, equipment, tourism, and population constructions outside the urban limits. 160 or Ex 96 RCA 124/2008. Approved by Resolution N°. 577/2011
Permit for the qualification of industrial or warehousing establishments. 161 RCA 004/2005 Approved by Resolution N°. 686/2014

 

Source: Elaboration by SQM

 

SQM TRS Nueva Victoria Pag. 240

 

 

 

Additionally, an authorization of the Exploitation Method and Processing Plants is required. These authorizations are:

 

Res. Annex 1447/2018. Exploitation method update – Office Iris

 

Res. Ex. 1646/2011. Approves the Project "Update of Operation Nueva Victoria ".

 

Res. 1602/2010. Approves Project "Stockpiles of discarded salts Sur Viejo."

 

Res. 621/2006. Increase in the exploitation of caliche in Nueva Victoria.

 

Res. 1469/2005. Regularization of the mine Exploitation Method and treatment of minerals and expansion of the Nueva Victoria mine and iodine plant.

 

Res.1351/2004. Regularization of the Exploitation Method and Processing Plants of the Iris office.

 

Res. Ex. 515/2012. Update Exploitation Method, Mineral Treatment and Closure Plan.

 

Res. Ex. 121/2022. Tea Project Benefit Plant.

 

Social and Community

 

This sub-section contains forward-looking information related to plans, negotiations or agreements with local individuals or groups for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecasts, or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that were set forth in this sub-section including that regulatory framework is unchanged for Study period; no unforeseen environmental, social or community events disrupt timely approvals.

 

17.1.6Plans, Negotiations or Agreements with Individuals or Local Groups

 

The company has established agreements with indigenous and non-indigenous organizations on different aspects that derive both from previous commitments and from programs associated with corporate policies on community relations, for example:

 

Registration of the community care line, as a permanent communication mechanism.

 

Instances of dialogue and collaboration with the social organizations of the commune: Work tables, periodic meetings and community attention office located in the town of Pozo Almonte.

 

Working groups with different communities and territories:

 

Bellavista Sector: there is a Memorandum of Understanding and Agreement that incorporates Voluntary Environmental Commitments (CAV), in the framework of the EIA "Tente en el Aire" (Digital Document 20210100112/19.10.2021). Regardless of the above, there were minutes in sight from September 2020 to June 2021, reporting on the progress of the working group in the context of the Work Plan (Memorandum and Agreement).

 

SQM TRS Nueva Victoria Pag. 241

 

 

 

Huatacondo Quechua Indigenous Community: there is also a Memorandum of Understanding and Voluntary Environmental Commitments (CAV). In this context, there are minutes in sight - between December 2020 and June 2021 - regarding the implementation of an Environmental Education Center in the Llamara sector. This project was developed in coordination with the National Corporation for Forestry Development (Conaf).

 

·Aymara Indigenous Community of Quillagua: as in the previous cases, they are part of the Memorandum of Understanding and Voluntary Environmental Commitments (CAV). Consequently, minutes of meetings held between June 2020 and August 2021 were presented, in which topics such as: Report of the Environment Programmer; Chug Chug Park; Quillagua Development Plan; Algarrobo Park Project; land leasing; Foundation, and sector "Quebrada Amarga", among others.

 

It should be noted that, in general terms, and in accordance with the confidentiality clause, the final amount of the commitments signed by SQM with local organizations or communities is not available.

 

Notwithstanding the foregoing, a document or agreement was available in standard format, with contents such as the following: general background of the agreement; background on community relations; long-term relationship; validation of agreements; Contributions; accountability of funds; external audit; work table and operation; obligations of the parties; environmental commitments for the sustainability of the territory; communications between the parties; conflict resolution; mechanisms for revising the agreement; Allocation of rights; anti-corruption clause; other commitments; termination of the agreement; domicile.

 

However, within the framework of the company's relationship policies, the following working groups are maintained:

 

IQUIQUE

 

1.Working Group of the Union of Fishermen N° 1 of Chanavayita.

 

2.Working Table of the Union of Fishermen N° 2 of Chanavayita.

 

3.Working Table of the Union of Fishermen N° 3 of Chanavayita.

 

4.Working Table of the Union of Fishermen N° 4 of Chanavayita.

 

5.Working Table of the Union of Fishermen N° 5 of Chanavayita.

 

6.Working table of the Fishermen's Guild N° 6 Chanavayita.

 

7.Working Group of Coastal Unions, which brings together: Union N° 1 of Caramucho, Union of Fishermen N° 2 of Caramucho and Union of Hemp Fishermen.

 

8.Working Group Fishermen's Union N°3 Caramucho

 

SQM TRS Nueva Victoria Pag. 242

 

 

 

ALMONTE WELL

 

1.Working table of the Multiethnic Association Jehovah's Lands of Colonia Pintados

 

2.Working Group of the Aymara Indigenous Association Youth of the Desert

 

3.Working table Victoria Office Neighborhood Council.

 

4.Working table with GHPPI Familia Choque, Bellavista Sector, RNPT

 

5.Working table with the Sandra Vicentelo Family, Tamentíca.

 

6.Working Group Aymara Indigenous Association Campesinos Pampa del Tamarugal.

 

7.Working Group of Dairy Cooperatives and Dairy Producers of Tarapacá.

 

17.1.7Purchasing Commitments or Local Contracting

 

Notwithstanding the foregoing, as part of its community relations policy, SQM has programs aimed at hiring local labor, such as:

 

Employability Workshops aimed at improving curriculum vitae for job interviews.

 

More Suppliers Program of Tarapacá.

 

Development Program of Agricultural Suppliers in the Province of Tamarugal.

 

Channel of diffusion with Municipal Office of Information Laboral of the Municipality of Pozo Almonte of labor offer of the company.

 

Channel of dissemination and follow-up with the organizations attached to the different instances of local collaboration (Work Tables) of labor offer of the company.

 

Educational support program with Liceo de Pozo Almonte for labor induction and professional practices

 

17.1.8Social Risk Matrix

 

There is no specific risk matrix to assess these aspects at the corporate level. In the framework of the working meetings for the preparation of this report, it was indicated that there are initiatives to evaluate these aspects but that they lack a specific program or derive from a specific commitment or objective.

 

SQM TRS Nueva Victoria Pag. 243

 

 

 

Mine Closure

 

This sub-section contains forward-looking information related to mine closure for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecasts or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that were set forth in this sub-section including prevailing economic conditions continue such that unit costs are as estimated in constant (or real) dollar terms, projected labor and equipment productivity levels are appropriate at time of closure and estimated infrastructure and mining facilities are appropriate at the time of closure.

 

17.1.9Closure, Remediation, and Reclamation Plans

 

During the stage of the Project, the measures established in the "Faena Nueva Victoria" Closure Plan approved by the National Geology and Mining Service (SNGM) will be maintained, through the update of the “Nueva Victoria e Iris” Mining Slaughter Plan (RPC -57.1 585), approved on May 16, 2022, through Exempt Resolution N° 814 and modified by Exempt Resolution N°. 1511, by the National Geology and Mining Service (SERNAGEOMIN). This update includes the following mining sites resolutions. Resolution N°. 1858 of 2015, as amended by Resolution N°. 2817 of 2015 implemented.

 

Project Name Resolution Year
1 Regularization of the Exploitation Method and Plants Iris Office Benefit 1351 2004
2 Regularization of Mine and Mineral Treatment Method and Expansion of Nueva Victoria Mine and Iodide Plant 1469 2005
3 Modify RCA N°004/2005 88 2016
4 Increased Caliche Exploitation in Nueva Victoria 621 2006
5 Iris Slaughter Closure Plan 376 2009
6 Deposit of Discarded Salts Sur Viejo 1602 2010
7 Update Operation New Victoria 1646 2011
8 Pampa Hermosa: Update Exploitation Method, Mineral Treatment and Closure Plan 515 2012
9 Partial temporary shutdown of the Iris Iodine Plant 49 2014
10 Closure Plan for Nueva Victoria Mining Site 1858 2015
11 Modifies Exempt Resolution N°. 1858/2015 2817 2015
12 Update Exploitation Method – Iris Office Site 1447 2018
13 Discard salts as sterile dumps 424 2022
14 Approval of waste dumps corresponding to Depleted Leaching Piles "Faena Nueva Victoria" 2129 2020
15 TEA Project Benefit Plant 121 2022
16 Exploitation Methods TEA Project 47 2022

 

Among the measures to be implemented are the removal of metal structures, equipment, materials, boards and electrical systems, de-energization of facilities, closure of accesses and installation of signaling. The activities related to the cessation of operations of the Project will be carried out in full compliance with the legal provisions in force on the date of closure of the Project, especially those related to the protection of workers and the environment.

 

SQM TRS Nueva Victoria Pag. 244

 

 

 

Closing measures

 

The following are the closure and post-closure measures for the main or remaining facilities, i.e., those that remain on the site after the end of the mine's useful life. The remaining facilities are the leach heaps, tailings ponds and solar evaporation ponds.

 

In the case of the waste collection, slope stabilization measures will be carried out in the post-closure phase. For the closure of the leaching piles, the removal of structures, equipment, electrical equipment, concrete structures, support structures and pipes, as well as the closure of accesses and installation of closing signals, will be considered. For the closure of the solar evaporation pools, measures were defined for the removal of nitrate-rich salts, removal of parapets, concrete structures, and support structures.

 

For the rest of the complementary and auxiliary installations, the measures are also aimed at protecting the safety of people and animals, and are basically the dismantling of structures, closure of roads, signaling installation, de-energization of the facilities and perimeter closures, and leveling of the land.

 

All measures are of the "Personal Security" type and the means of verification corresponds to photographic reports.

 

Risk Analysis

 

SERNAGEOMIN, in consideration of Law 20,551 and Supreme Decree N°41/2012, requests owners to carry out a risk assessment that considers the impacts on the health of people and the environment in the context of the closure of the mining site at the end of its useful life. This risk assessment was carried out considering the Risk Assessment Methodology for Mine Closure currently in force. The results of the assessment indicate that the risks associated with the remaining facilities of the Nueva Victoria Mine and TEA project are Low and Not Significant (see Table 17-6).

 

SQM TRS Nueva Victoria Pag. 245

 

 

 

Table 17-6. Risk Assessment of the Main Facilities at the Nueva Victoria and TEA Project Mine

 

Register Risk Description of Risk Level Nueva Victoria Level Project Tea Significance
Solar Evaporation Ponds
PE1 PE1.P To people due to failure in the slope of the pool, which exceeds the exclusion zone due to an earthquake. LOW LOW Non- significant
PE1.MA To the Environment due to failure in the slope of the pool, which exceeds the exclusion zone because of an earthquake. LOW LOW Non- significant
PE2 PE2.P To persons for DAR infiltration LOW LOW Non- significant
PE2.MA To the environment by DAR infiltration LOW LOW Non- significant
Discard salt deposits
DE1 DE1.P To people due to groundwater contamination from rainfall (infiltration of solutions). LOW LOW Non- significant
DE1.MA To the environment due to groundwater contamination caused by rainfall (infiltration of solutions). LOW LOW Non- significant
DE2 DE2.P To people due to groundwater contamination from floods/floods LOW LOW Non- significant
DE2.MA To the environment due to groundwater contamination caused by floods/floods LOW LOW Non- significant
DE3 DE3.P To people due to particulate emissions into the atmosphere caused by wind. LOW LOW Non- significant
DE3.MA To the environment due to particulate emissions to the atmosphere caused by wind LOW LOW Non- significant
DE4 DE4.P To people due to surface water pollution caused by heavy rainfall LOW LOW Non- significant
DE4.MA To the Environment due to surface water contamination caused by heavy rainfall LOW LOW Non- significant
DE5 DE5.P To people due to surface water contamination caused by floods LOW LOW Non- significant
DE5.MA To the Environment due to surface water contamination caused by floods LOW LOW Non- significant
DE6 DE6.P To people as a result of slope failure due to water erosion LOW LOW Non- significant
DE6.MA To the Environment for slope failure due to water erosion LOW LOW Non- significant
DE7 DE7.P To people due to slope failure as a result of an earthquake LOW LOW Non- significant
DE7.MA To the Environment due to slope failure caused by an earthquake LOW LOW Non- significant
MINE
MR1 MR1.P To people due to failure of the pit slope, which exceeds the exclusion zone due to an earthquake. LOW LOW Non- significant
MR1.MA To the environment due to failure of the pit slope that exceeds the exclusion zone because of an earthquake. LOW LOW Non- significant
MR2 MR2.P To people due to DAR infiltration from the mine LOW LOW Non- significant
MR2.MA To the environment due to DAR infiltration from the mine LOW LOW Non- significant

 

Source: Annex 10 of the Nueva Victoria and TEA project Mine Closure Plan Update (in process).

 

SQM TRS Nueva Victoria Pag. 246

 

 

 

17.1.10Closure Costs

 

The total amount of the closure of the mining site of the Nueva Victoria and Iris Project, considering closure and post-closure activities, amounts to 284,507 UF (272,271 UF for closure and 12,236 UF for post-closure). The following is a summary of the costs reported to the authority in the Update of the Closure Plan of the “Nueva Victoria e Iris” Mining Site (see Table 17-7 and Table 17-8).

 

Table 17-7. Nueva Victoria Mine Site Closure Costs

 

Item Total (UF)
Total direct closing cost 173,333
Indirect Cost 17,333
Contingencies 38,133
VAT (19%) 43,472
Total   272,271

 

Source: Annex 5, Addendum 2 to the Closure Plan Update Nueva Victoria and TEA project mine (in process)

 

Table 17-8. Nueva Victoria Mining Site Post-Closure Costs

 

Item Total (UF)
Direct Cost 7,789
Indirect Cost 779
Contingencies 1,714
VAT (19%) 1,954
Total 12,236

 

Source: Annex 5, Addendum 2 to the Closure Plan Update Nueva Victoria and TEA project mine (in process)

 

According to the technical report Useful Life presented technical and the constitution of the guarantees was made considering the total cost of the Closure Plan, and a useful life of 21 years, whose estimated operation would be until the year 2040. The following shows the development of the constitution of guarantees.

 

Table 17-9. General Background of Nueva Victoria

 

GENERAL BACKGROUND
Discount Rate Used 1.55%
Certified End of Life 2040
Year of Closure of the Mining Site 2050

 

SQM TRS Nueva Victoria Pag. 247

 

 

 

Table 17-10. Warranties by Installation of the Nueva Victoria Mine Closure Plan.

 

TABLE OF WARRANTIES BY INSTALLATION
Installation Total Cost (UF) Year Completion
of Operations
Year Start
of closure
End of
Closure Year
Mine (Caliche) 13,364 2040 2041 2050
Mine Operation Center (COM) 35,899
Evaporation Pools and Neutralization System 11,711
Sea Water Supply 51,824
ND Iodide Plant 7,529
TEA Iodide Plant 10,253
NV Iodide Plant (TEA Project) 5,107
Iodine Plant NV 4,690
Iodide Plant - Iris Iodine 20,939
Iodine Plant NV (TEA Project) 4,697
Campgrounds and Offices 7,985
Industrial Water Supply 47,442
Mitigation Works Salar Llamara 1,290
Hazardous Waste Yard 2,345
Patio de Res. Non - Hazardous Industrial 703
Roads 8,099
Desenergization 43
Signage 969
Removal of Swimming Pools and Pools 10,701
Withdrawal of inputs 26,681
Contribution to the Post Closing Fund (UF) 272,271      

 

SQM TRS Nueva Victoria Pag. 248

 

 

 

18Capital and Operating Costs

 

This section contains forward-looking information related to capital and operating cost estimates for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecasts or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that were set forth in this section including prevailing economic conditions continue such that unit costs are as estimated in constant (or real) dollar terms, projected labor and equipment productivity levels and that contingency is sufficient to account for changes in material factors or assumptions.

 

The main facilities for producing iodine and nitrate salts at the Nueva Victoria Site are as follows:

 

Caliche Mining

 

Heap Leaching

 

Iodide & Iodine Plants

 

Solar Evaporation Ponds

 

Water Resource Provision

 

Electrical Distribution System

 

General Facilities

 

Capital Costs

 

The main facilities for the production operations of Iodine and nitrate salts, include caliche extraction, leaching, water resources, Iodide an Iodine production plants, solar evaporation ponds, as well as other minor facilities. Offices and services include, among others, the following: common areas, supply areas, powerhouse, laboratory, and warehouse.

 

Much of the primary capital expenditure in the Nueva Victoria Project has been completed. At the end of 2021, the capital cost invested in these facilities was reportedly about USD 831 million with the relative expenditure by major category as shown in Table 18-1

 

Table 18-1. Summary of Capital Expenses for the Nueva Victoria an Iris Operations

 

  Capital Cost
  %  Total MM USD
Category 100% 831,567
Caliche Mining (*) 27% 222,929
Heap Leaching 17% 144,871
Iodide & Iodine Plant 20% 165,989
Solar Evaporation Ponds 20% 168,937
Water Resources Provision 10% 80,719
Electrical Distribution System 3% 23,833
Roads 3% 24,289

 

SQM TRS Nueva Victoria Pag. 249

 

 

 

The net book value as of January 1, 2023, was reportedly about MUSD 245.2 and according to SQM will be depreciated over the next 5 years.

 

18.1.1Caliche Mining

 

SQM produces salts rich in iodide, iodine and nitrate in Nueva Victoria and Iris, near Iquique, Chile, mineral caliche extracted from mines near Nueva Victoria.

 

Capital investment in the mine is primarily for the equipment including trucks, front loaders, bulldozers, drills, surface miners (Vermeer, Wirtgen), wheeldozers, motor graders. Other investment is in buildings and support facilities and associated equipment.

 

18.1.2Heap Leaching

 

The leach piles are made up of platforms (normally 90 x 500 m, with perimeter parapets and with a bottom waterproofed with HDPE membranes), which are loaded with the necessary caliche and are irrigated with different solutions (water, mixture, or intermediate solution of piles).

 

The Mine Operation Centers (COM) are a set of leaching heaps that have brine accumulation ponds, recirculated “feeble brine” ponds, industrial water ponds and their respective pumping systems.

 

Primary capital expenditure is in the form of piping, electrical facilities and equipment, pumps, ponds, and support equipment.

 

18.1.3Iodide and Iodine Plants

 

The main investment in the Iodide and Iodine Plants is found in tank and decanter equipment, pumps and piping, equipment and electrical facilities, buildings and well. primary investment in the Prilate Iodine Plant is found in piping and pumps, mechanical equipment (Reactor, Tank, Tower) and buildings.

 

18.1.4Solar Evaporation Ponds

 

These ponds in the industrial area of Sur Viejo and receive the “Feeble Brine” fraction (BF) generated in the process of obtaining iodide, which is transported through 3 pipelines of approximately 20 kilometers each. The current area of evaporation ponds is 8.34 km², increasing to a total of 18.51 km² with TEA project.

 

18.1.5Water Resources

 

Primary investment is in piping, pumps, buildings, and wells.

 

18.1.6Electrical Distribution System

 

Primary investment is in transformers, substations, distribution systems and associated support facilities.

 

SQM TRS Nueva Victoria Pag. 250

 

 

 

18.1.7General Facilities

 

Investment in General Facilities include laboratories, fire detection systems, lighting, and warehouses.

 

Future Investment

 

During 2020, progress was made in the development and environmental processing of the Tente en el Aire Project. In November 2021, the Environmental Assessment Commission of the Tarapacá Region agreed to classify favorably the “Tente en el Aire” project, presented by SQM.

 

With an investment of US$350 million, the initiative aims to incorporate new mining areas to produce iodide, iodine, and salts rich in nitrates at the Nueva Victoria Site, which entails an increase in the total amount of caliche extract, and in the use of water for said processes.

 

The project corresponds to a modification of the Nueva Victoria Faena consisting of:

 

a)New mining areas (approx. 43,586 ha), with a caliche extraction rate of 28 million t/y, resulting in a total of 65 Mt/y.

 

b)Two new iodide production plants (6,000 t/y each), resulting in a total of 23,000 t/y.

 

c)A new iodine production plant (12,000 t/y), resulting in a total of 23,000 t/y.

 

d)New Evaporation Ponds to produce nitrate-rich salts (1,950,000 t/y), resulting in a total of 4,000,000 t/y.

 

e)A new neutralization system, a seawater adduction (900 L/s maximum) from the Bahía Patillos sector to the mining area.

 

f)A new electric transmission line from the National Electric System.

 

Additional capital for the Long Term is estimated to be USD 549 million including capital associated with the TEA expansion project and sustaining capital for mining and leaching operations for equipment, improving aspects of quality, performance, sustainability and increasing production capacity. The distribution of the operating cost is presented in table 18-2:

 

Table 18-2 Estimated Investment

 

Investment
(MUS$)
2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 Total
Sea Water Pipeline 64 73 127         60                     324
Nueva Victoria 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 540

 

SQM TRS Nueva Victoria Pag. 251

 

 

 

Operating Cost

 

The main costs to produce Iodine and Nitrates involve the following components: common production cost for iodine and nitrates, such as Mining, Leaching and Seawater, production cost of iodine in the plant, and the production cost of nitrate before processing at the Coya Sur site.

 

The production cost of nitrate at Coya Sur Plant and the processing of extra solar salt are added. To the costs indicated above, have been added the Depreciation and Others.

 

Estimated aggregate unit operating costs are presented in Table 18-3. These are based on historical unit operating costs for each of the sub-categories listed above.

 

Over the Long Term, total operating costs are expected to be almost equally apportioned amongst the three primary categories (Common; Iodine Production and Transport; Nitrate Production and Transport).

 

Table 18-3 Nueva Victoria Operating Cost

 

Cost Category Estimated Unit Cost
Common (Mining / Leaching/ Seawater) 4,55 US$/Ton caliche
Iodine Production (including transport to ports) 19,470 US$/Ton iodine
Nitrates Production 82,31 US$/Ton nitrate
Nitrates Transport to Coya Sur 35,05 US$/Ton nitrate

 

SQM TRS Nueva Victoria Pag. 252

 

 

 

19Economic Analysis

 

This section contains forward-looking information related to economic analysis for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecasts, or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that were set forth in this sub-section including estimated capital and operating costs, project schedule and approvals timing, availability of funding, projected commodities markets, and prices.

 

Principal Assumptions

 

Capital and operating costs used in the economic analysis are as described in Section 18. Sales prices used for Iodine and Nitrates are as described in Section 16. A 10% discount rate was used for the cashflow and is deemed reasonable to account for cost of capital and project risk. A 28% income tax rate was considerate, and all costs, prices, and values shown in this section are in 2022 US$.

 

Production and Sales

 

The estimated production of iodine and nitrates for the period 2022 to 2040 is presented in Table 19-1. The production shown does not consider the impact of the Pampa Orcoma Project which is presented in a separate TRS.

 

Prices and Revenue

 

An average sales price of 40.0 USD/kg (40,000 USD/ton) was used for sales of Iodine based on the market study presented in in Section 16. This price is assessed as FOB port.

 

As a vertically integrated company, nitrate production from the mining operations is directed to the plant at Coya Sur to produce specialty fertilizer products. An imputed sales price of 333 USD/ton was assumed for nitrates salts for fertilizer based on an average sales price of 820 USD/ton for finished fertilizer products sold at Coya Sur, less 487 USD/ton for production costs at Coya Sur.

 

These prices and the revenue streams derived from the sale of iodine and nitrates is shown in Table 19-2.

 

SQM TRS Nueva Victoria Pag. 253

 

 

 

 

 

 

 

 

 

Table 19-1. Nueva Victoria Long Term of Mine Production

 

MATERIAL MOVEMENT UNITS 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 TOTAL
Nueva Victoria Sector Ore Tonnage Mt 16 16 16 16 16 16 16 16 0 0 0 0 0 0 0 0 0 0 128
Iodine (I2) in situ ppm 417 416 388 386 386 389 414 410 0 0 0 0 0 0 0 0 0 0 401
Average grade Nitrate Salts (NaNO3) % 5.8% 4.7% 4.5% 4.0% 4.0% 4.2% 5.2% 4.7% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.6%
Tente en el Aire (TEA) Sector Ore Tonnage Mt 10 10 10 10 10 10 10 10 10 10 10 0 0 0 0 0 0 0 110
Iodine (I2) in situ ppm 403 403 420 400 429 404 405 394 364 403 404 0 0 0 0 0 0 0 403
Average grade Nitrate Salts (NaNO3) % 4.3% 4.3% 5.4% 5.0% 5.2% 4.5% 4.1% 4.0% 4.0% 4.1% 4.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.4%
Hermosa Sector Ore Tonnage Mt 18 18 18 18 18 18 18 18 34 34 33 43 42 42 41 41 41 40 535
Iodine (I2) in situ ppm 482 460 478 464 466 441 459 428 423 424 425 418 421 417 422 422 415 422 431
Average grade Nitrate Salts (NaNO3) % 6.6% 6.1% 6.4% 6.2% 6.6% 6.2% 5.8% 5.8% 5.9% 5.5% 5.4% 5.4% 5.3% 5.4% 5.3% 5.3% 5.4% 5.3% 5.6%
TOTAL ORE MINED (CALICHE) Mt 44 44 44 44 44 44 44 44 44 44 43 43 42 42 41 41 41 40 773
Iodine (I2) in situ kt 19.3 19.1 19.5 18.6 18.9 18.1 19.0 17.9 18.0 18.3 18.1 17.9 17.8 17.4 17.5 17.3 16.8 16.9 326.4
Yield process to produce prilled Iodine % 55.6% 54.6% 53.0% 55.8% 59.9% 54.7% 55.2% 59.9% 59.2% 55.8% 55.2% 55.4% 56.0% 56.2% 56.9% 56.9% 57.2% 58.4% 56.4%
Prilled Iodine produced kt 10.7 10.1 10.6 11.1 10.3 10.0 11.3 10.8 10.1 10.1 10.1 10.0 10.0 9.9 9.9 9.9 9.8 9.8 184.6
Nitrate Salts in situ kt 2,586 2,344 2,398 2,261 2,343 2,228 2,422 2,097 2,377 2,331 2,306 2,286 2,260 2,241 2,212 2,188 2,174 2,143 41,198
Yield process to produce Nitrates % 43.4% 46.9% 48.2% 58.2% 59.0% 59.0% 57.8% 58.2% 58.0% 59.8% 60.9% 61.1% 62.2% 63.0% 64.2% 65.2% 65.9% 67.3% 58.7%
Nitrate production from Leaching kt 1,122 1,070 1,162 1,312 1,387 1,317 1,324 1,278 1,395 1,349 1,333 1,398 1,405 1,412 1,419 1,427 1,434 1,442 23,985
Ponds Yield to produce Nitrates Salts % 54.2% 60.7% 68.5% 64.3% 65.9% 64.7% 66.3% 63.5% 63.5% 63.5% 63.5% 63.5% 63.5% 63.5% 63.5% 63.5% 63.5% 63.5% 63.6%
Nitrate Salts for Fertilizers kt 608 649 796 843 914 852 878 812 886 857 847 888 893 897 902 906 911 916 15,256

 

SQM TRS Nueva Victoria Pag. 254

 

 

 

 

Table 19-2. Nueva Victoria Iodine and Nitrate Price and Revenues

 

PRICES UNITS 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 TOTAL
Iodine US$/t 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000
Nitrates delivered to Coya Sur US$/t 333 333 333 333 333 333 333 333 333 333 333 333 333 333 333 333 333 333 333
REVENUE UNITS 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 TOTAL
Iodine US$M 430 402 424 444 413 401 454 431 402 403 402 400 400 397 397 396 393 393 7,384
Nitrates delivered to Coya Sur US$M 203 216 265 281 304 284 292 270 295 285 282 296 297 299 300 302 303 305 7,987
Total Revenues US$M 632 618 689 725 717 685 746 702 697 689 684 696 697 696 698 698 696 698 15,371

 

 

SQM TRS Nueva Victoria Pag. 255

 

 

 

 

Operating Costs

 

Operating costs associated with the production of iodine and nitrates at Nueva Victoria are as described earlier in Section 18 and are incurred in the following primary areas:

 

1. Common

 

2. Iodine Production

 

3. Nitrate Production

 

Additional details on operating costs may be found in Section 18.3. Unit costs for each of these unit operations is shown in Table 19-3.

 

SQM TRS Nueva Victoria Pag. 256

 

 

 

 

Table 19-3. Nueva Victoria Operating Costs.

  

COSTS UNITS 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 TOTAL
COMMON                                        
Mining US$M 122 122 122 122 122 122 122 122 122 121 120 119 118 116 115 114 113 112 2,149
Leaching US$M 62 62 59 52 52 52 52 52 52 52 51 51 50 50 49 49 48 48 946
Seawater US$M 0 0 6 25 25 25 25 25 25 24 24 24 24 23 23 23 23 22 365
Total Mining Costs US$M 184 184 188 200 200 200 200 200 200 198 196 194 192 190 188 186 184 182 3,460
IODINE PRODUCTION                                        
Solution Cost US$M 149 147 142 151 147 151 149 153 149 149 147 143 141 139 136 134 132 130 2,589
Iodide Plant US$M 31 29 31 32 30 29 33 31 29 29 29 29 29 29 29 29 29 29 537
Iodine Plant US$M 20 19 20 21 19 19 21 20 19 19 19 18 18 18 18 18 18 18 341
Total Iodine Production Cost US$M 200 195 193 204 196 199 203 204 197 197 195 191 188 186 183 181 179 176 3,467
Total Iodine Production Cost US$/kg Iodine 19 19 18 18 19 20 18 19 20 20 19 19 19 19 18 18 18 18 19
NITRATE PRODUCTION                                        
Solution Cost US$M 35 37 45 48 52 49 50 46 51 49 48 51 51 51 51 52 52 52 871
Ponds and preparation US$M 24 25 31 33 35 33 34 31 34 33 33 34 35 35 35 35 35 35 591
Harvest production US$M 3 3 4 4 5 5 5 4 5 5 5 5 5 5 5 5 5 5 81
Others (G&A) US$M 2 2 2 2 3 2 2 2 2 2 2 2 2 2 2 2 3 3 42
Transport to Coya Sur US$M 21 23 28 30 32 30 31 28 31 30 30 31 31 31 32 32 32 32 535
Total Nitrate Production Cost US$M 85 90 111 117 127 118 122 113 123 119 118 123 124 125 125 126 127 127 2,120
Total Nitrate Production Cost US$/t Nitrate 139 139 139 139 139 139 139 139 139 139 139 139 139 139 139 139 139 139 139
Closure Accretion US$M                                   11 11
TOTAL OPERATING COST US$M 285 285 303 321 323 317 325 317 320 316 313 314 312 310 309 307 305 315 5,598
TOTAL OPERATING COST US$/t Caliche 6.5 6.5 6.9 7.3 7.4 7.2 7.4 7.2 7.3 7.2 7.3 7.4 7.4 7.4 7.5 7.5 7.5 7.8 7.2

 

SQM TRS Nueva Victoria Pag. 257

 

 

 

 

Capital Expenditure

 

Much of the primary capital expenditure in the Nueva Victoria Project has been completed.

 

The most significant proposed future capital expenditure is for the seawater pipeline to support the proposed TEA Expansion Project. This investment is expected to need USD 263 million between 2023- 2025 and USD 60 million in year 2030.

 

Additional capital for the Long Term is estimated to be USD 549 million including capital associated with the TEA expansion project and sustaining capital for mining and leaching operations. for equipment, improving aspects of quality, performance, sustainability and increasing production capacity.

 

A closure costs of USD 11 million has been estimated in 2040 in the cashflow.

 

Additional details on capital expenditures for the Nueva Victoria Project can be found in Section 18.1 and Section 18.2. The estimated capital expenditure for the Long Term (2023 to 2040) is presented in Table 18-2.

 

Cashflow Forecast

 

The cashflow for the Nueva Victoria Project is presented in Table 19-4.The following is a summary of key results from the cashflow:

 

Total Revenue: estimated to be USD 15.37 billion including sales of iodine and nitrates.

 

Total Operating Cost: estimated to be USD 5.59 billion.

 

EBITDA: estimated at USD 9.77 billion

 

Tax Rate of 28% on pre-tax gross income

 

Closure Cost: estimated at USD 11 million

 

Capital Expenditure estimated at USD 872 million

 

Net Change in Working Capital is based on two months of EBITDA.

 

A discount rate of 10% was utilized to determine NPV. The QP deems this to be a reasonable discount rate to apply for this TRS which reasonable accounts for cost of capital and project risk.

 

After-tax Cashflow: The cashflow is calculated by subtracting all operating costs, taxes, capital costs, interest payments, and closure costs from the total revenue.

 

Net Present Value: The after tax NPV is estimated to be USD 1.81 billion at a discount rate of 10%

 

The QP considers the accuracy and contingency of cost estimates to be well within a Prefeasibility Study (PFS) standard and sufficient for the economic analysis supporting the Mineral Reserve estimate for Nueva Victoria.

 

SQM TRS Nueva Victoria Pag. 258

 

 

 

 

Table 19-4. Estimated Net Present Value (NPV) for the Period

 

REVENUE UNITS 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 TOTAL
Total Revenue US$M 632 618 689 725 717 685 746 702 697 689 684 696 697 696 698 698 696 698 15,371
COSTS                                        
Total Mining Costs US$M 184 184 188 200 200 200 200 200 200 198 196 194 192 190 188 186 184 182 3,460
Total Iodine Production Cost US$M 200 195 193 204 196 199 203 204 197 197 195 191 188 186 183 181 179 176 3,467
Total Nitrate Production Cost US$M 85 90 111 117 127 118 122 113 123 119 118 123 124 125 125 126 127 127 2,120
Closure Accretion US$M                                   11 11
TOTAL OPERATING COST US$M 285 285 303 321 323 317 325 317 320 316 313 314 312 310 309 307 305 315 5,598
EBITDA US$M 347 333 386 404 394 368 421 385 377 373 371 382 385 386 389 391 391 384 9,773
Depreciation US$M 35 40 48 50 51 53 24 28 30 31 33 34 36 37 39 41 42 44 697
Interest Payments US$M 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 540
Pre-Tax Gross Income US$M 282 263 308 324 312 286 367 326 317 311 309 318 319 318 320 320 319 310 5,629
Taxes 28% 79 74 86 91 87 80 103 91 89 87 86 89 89 89 90 90 89 87 1,576
Operating Income US$M 203 189 222 233 225 206 264 235 229 224 222 229 229 229 230 231 230 223 4,053
Add back depreciation US$M 35 40 48 50 51 53 24 28 30 31 33 34 36 37 39 41 42 44 697
Add back closure accretion US$M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 11
NET INCOME AFTER TAXES US$M 238 230 270 283 276 258 288 263 258 256 255 263 265 267 269 271 272 278 4,761
Total CAPEX US$M 94 103 157 30 30 30 30 90 30 30 30 30 30 30 30 30 30 30 872
Closure Costs US$M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 11
Working Capital US$M 2 -2 9 3 -2 -4 9 -6 -1 -1 0 2 0 0 1 0 0 -1 8
Pre-Tax Cashflow US$M 252 232 220 370 365 342 382 300 348 343 341 350 354 355 358 360 361 344 5,976
After-Tax Cashflow US$M 143 129 104 249 247 232 249 179 229 226 225 231 234 236 238 240 241 238 3,870
Pre-Tax NPV US$M 2,858                                    
After-Tax NPV US$M 1,811                                    
Discount Rate US$M 10%                                    

 

SQM TRS Nueva Victoria Pag. 259

 

 

 

 

Sensitivity Analysis

  

The sensitivity analysis was carried out by independently varying the commodity prices (Iodine, Nitrate), operating cost, and capital cost. The results of the sensitivity analysis are shown in Figure 19-1 shows the relative sensitivity of each key metric.

 

Figure 19-1. Sensitivity Analysis

 

 

As seen in the above figure, the project NPV is equally sensitive to operating cost and commodity price while being least sensitive to capital costs. This is to be expected for a mature, well-established project with much of its infrastructure already in place and no significantly large projects currently planned during the LOM discussed in this Study. Both iodine and nitrate prices have a similar impact on the NPV with nitrate prices having a slightly larger impact.

 

SQM TRS Nueva Victoria Pag. 260

 

 

 

 

20Adjacent Properties

 

SQM has the right to explore and/or exploit caliche mineral resources in an effective area covering more than 1,539,177 hectares in Northern Chile's Regions I and II. Prospect deposits are located on flat land or "pampas".

 

Hermosa Oeste

 

Tente en el Aire Oeste.

 

Pampa Hermosa

 

Pampa Engañadora

 

Hermosa

 

Fortuna

 

Cocar

 

Coruña

 

Hermosa Sur

 

Los Ángeles

 

Tente en el aire à (Tea Sur – Tea Central – Tea Felipe – Cop 5)

 

Franja Oeste

 

Iris Vigía

 

Oeste III

 

Torcaza

 

Sur

 

Oeste

 

All prospected areas have been explored and exploration program results have indicated that these prospects reflect a mineralized trend hosting nitrate and iodine. For the year 2022, a detailed exploration program of 5,250 ha in the Hermosa Oeste and Tente en el Aire Oeste sector is underway. On the other hand, exploration efforts are focused on possible metallic mineralization found underneath caliche. There is significant potential for metallic mineralization in the area, especially copper and gold. Exploration has generated discoveries that in some cases may lead to exploitation, discovery sales and future royalty generation.

 

Along SQM-Nueva Victoria's boundary, as shown in Figure 20-1, there are some small-scale mining rights. In total there are two mining lots (shown in green: North-east and south-east), which are close to the property boundary.

 

SQM TRS Nueva Victoria Pag. 261

 

 

 

 

Figure 20-1. Nueva Victoria Adjacent Properties.

 

 

 

SQM TRS Nueva Victoria Pag. 262

 

 

 

 

21Other Relevant Data and Information

 

The QP is not aware of any other relevant data or information to disclose in this TRS.

 

SQM TRS Nueva Victoria Pag. 263

 

 

 

 

22Interpretation and Conclusions

 

This section contains forward-looking information related to Mineral Resources and the Long Term plan for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecasts or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that were forth in this sub-section including: geological and grade interpretations and controls and assumptions and forecasts associated with establishing the prospects for economic extraction; grade continuity analysis and assumptions; Mineral Resource model Tonnes and grade and mine design parameters; actual plant feed characteristics that are different from the historical operations or from samples tested to date; equipment and operational performance that yield different results from the historical operations and historical and current test work results; mining strategy and production rates; expected mine life and mining unit dimensions; prevailing economic conditions, commodity markets and prices over the Long Term period; regulatory framework is unchanged during the Study period and no unforeseen environmental, social or community events disrupt timely approvals; estimated capital and operating costs; and project schedule and approvals timing with availability of funding.

 

The Nueva Victoria Mine is a proven producer of both iodine and nitrate fertilizer products. Current exploration drilling has identified Mineral Resources and Mineral Reserves sufficient to continue production until 2040. To accomplish this, certain planned strategic investments must be implemented, including a sea water intake and supply system for the operation.

 

To reach this conclusion, has reviewed the available data on geology, drilling, mining, and mineral processing, and has concluded that Mineral Resources, costs, and recoveries are reasonable. The largest risks for the operation will lie in changes to market conditions or to the cost of operating inputs.

 

The work done in this report has demonstrated that the mine, heap leach facility and the iodine and nitrate operations correspond to those of a technically feasible and economically viable project. The most appropriate process route is determined to be the selected unit operations of the existing plants, which are otherwise typical of the industry.

 

The current needs of the nitrate and iodine process, such as power, water, labor, and supplies, are met as this is a mature operation with many years of production supported by the current project infrastructure. As such, performance information on the valuable nitrate and iodine species consists of a significant amount of historical production data, which is useful for predicting metallurgical recoveries from the process plant. Along with this, metallurgical tests are intended to estimate the response of different caliche ores to leaching.

 

Miss. Marta Aguilera QP of Reserves, concludes that the work done in the preparation of this technical report includes adequate details and information to declare the Mineral Reserves. In relation to the resource treatment processes, the conclusion of the responsible QP, Gino Slanzi, is that appropriate work practices and equipment, design methods and processing equipment selection criteria have been used. In addition, the company has developed new processes that have continuously and systematically optimized its operations.

 

The QP believes that mining and continued development of the Nueva Victoria project should continue and be integrated into SQM’s corporate plans.

 

SQM TRS Nueva Victoria Pag. 264

 

 

 

 

Results

 

22.1.1Geology and Mineral Resources

 

Nueva Victoria is a nitrate-iodine deposit located the intermediate depression, limited to the east by the Coastal Range (representing the Jurassic magmatic arc) and the Precordillera (associated to the magmatic activity originating from the mega Cu-Au deposits in northern Chile), generating a natural barrier for their deposition and concentration.

 

The Nueva Victoria geology team has a clear understanding of mineralization controls and the geological and deposit related knowledge has been appropriately used to develop and guide the exploration, modeling, and estimation processes.

 

Sampling methods, sample preparation, analysis and security were acceptable for mineral resource estimation. The collected sample data adequately reflect deposit dimensions, true widths of mineralization, and the style of the deposits. Sampling is representative of the Iodine and Nitrate Grades.

 

As of December 31, 2022, the Inferred Resources (exclusive of Mineral Reserves) for iodine and nitrate in Nueva Victoria are 31.1 Mt with a 343 ppm mean grade of Iodine and 6.5% of nitrate. Note that because the caliche deposit is at the surface, all measured and indicated resources with environment permits has been converted into mineral reserves.

 

The average mineral resource concentrations are above the cutoff grades of 3.0 % of Nitrate, reflecting that the potential extraction is economically viable.

 

SQM holds a large property position with similar geology and geomorphology as the current operations. It is probable that SQM will continue to find additional mineral resources in the Nueva Victoria area.

 

22.1.2Mining and Mineral Reserves

 

Nueva Victoria has been in operation since 2002 and is a stable enterprise that should continue producing into the future.

 

22.1.3Metallurgy and Mineral Processing

 

According to Gino Slanzi Guerra, the QP in charge of metallurgy and resource treatment:

 

There is a duly documented verification plan for the cover system to limit infiltration during leaching. The document establishes installation and leak detection procedures in accordance with environmental compliance criteria.

 

Metallurgical test work performed to date has been adequate to establish appropriate processing routes for the caliche resource. The metallurgical test results show that the recoveries are dependent on the saline matrix content and, on the other hand, the maximization of this is linked to the impregnation cycle which has been studied, establishing irrigation scales according to the classified physical nature. The derived data are suitable for the purpose of estimating recovery from mineral resources.

 

Based on the annual, short- and long-term production program, the yield is estimated for the different types of material to be exploited according to the mining plan, according to their classification of physical and chemical properties, obtaining a projection of recoveries that is considered quite adequate for the resources.

 

SQM TRS Nueva Victoria Pag. 265

 

 

 

 

In addition to the ROM mining methodology, there is a mining method called "Continuous Mining", which, according to the tests carried out with the reaming equipment, allows obtaining a smaller size mineral and more homogeneous granulometry, which implies obtaining higher recoveries for iodine and nitrate during leaching.

 

Reagent forecasting and dosing are based on analytical processes that determine ore grades, valuable element content and impurity content to ensure that the system's treatment requirements are effective. These are translated into consumption rate factors that are maturely studied.

 

Since access to water can be affected by different natural and anthropogenic factors, the use of seawater is a viable alternative for future or current operations. However, this may increase operating costs, resulting in additional maintenance days.

 

During operations, the content of impurities fed to the system and the concentration in the mother liquor is monitored to eventually detect any situation that may impact the treatment methodologies and the characteristics of its products.

 

SQM TRS Nueva Victoria Pag. 266

 

 

 

 

Risks

 

22.1.4Mining and Mineral Reserves

 

As mining proceeds into new areas, such as TEA, the production, dilution, and recovery factors may change based on operating factors. These factors and mining costs should be evaluated on a sector-by-sector basis.

 

22.1.5Metallurgy and Mineral Processing

 

The risk that the process, as currently defined, will not produce the expected quantity and/or quality required. However, exhaustive characterization tests have been carried out on the treated material and, moreover, at all stages of the process, controls are in place to manage within certain ranges a successful operation.

 

The risk that the degree of impurities in the natural resources may increase over time more than predicted by the model, which may result in non-compliance with certain product standards. Consequently, it may be necessary to incorporate other process stages, with the development of previous engineering studies, to comply with the standards.

 

22.1.6Other Risks

 

The prices of iodine and fertilizers have been stable and increasing and though product price is a risk it is expected to be small.

 

There is a social and political risk that derives from the current process of constitutional discussion in Chile, which may change the actual regulation of the mining industry This could impact to mining property, taxes, and future royalties.

 

Significant Opportunities

 

22.1.7Geology and Mineral Resources

 

There is a big opportunity to improve the resource estimation simplicity and reproducibility using the block model approach not only in the case of smaller drill hole grids of 50 x 50 m and up to 200 x 200m, but also for larger drill hole grids to avoid separating the resource model and databases by drill hole spacing, bringing the estimation and management of the resource model to industry standards.

 

22.1.8Mining and Mineral Reserves

 

Improve efficiency of mining by implementing selective mining criteria to improve produced grades. As the deposit is a single mining bench there is an opportunity to establish a smaller selective mining unit and mine irregular polygons to improve head grade delivered to the leach pads.

 

The advantages of continuous mining machines will offer better leaching recoveries and may be optimized with evaluation of cutter head designs and operating parameters. Care should be taken to evaluate the costs on a basis of final product production price.

 

SQM TRS Nueva Victoria Pag. 267

 

 

 

 

22.1.9Metallurgy and Mineral Processing

 

Determine the optimal mining levels by continuous mining that maximizes recovery and minimizes costs.

 

Improve heap slope irrigation conditions to increase iodine and nitrate recovery.

 

SQM TRS Nueva Victoria Pag. 268

 

 

 

 

23Recommendations

 

Geology and Mineral Resources

 

Confirm the accuracy and precision of SQM internal laboratory implementing an external QA/QC check with a representative number of samples as a routine procedure.

 

Quality procedures for data maintenance should be implemented as well as a formal methodology for reviewing laboratory QA/QC information and flagging potential issues.

 

Expand the block model approach for resource estimation to larger drill hole grids to avoid separating the resource model and databases by drill hole spacing.

 

Mining and Mineral Reserves

 

The conversion factors from indicated mineral resources to probable mineral reserves should be continuously reviewed and updated as preproduction drilling converts the indicated resources to measured. Expansion of the use of geostatistical block models (see above) will have an impact on these factors.

 

In cooperation with the processing group, an ore blending plan could optimize the cost and recovery balance in the future and should be studied soon to better forecast production and equipment needs for the life of mine.

 

Metallurgy and Mineral Processing

 

From the point of view of the material fed to the heaps, a recovery study is necessary to establish optimal annual operating levels that maximize recovery and minimize costs. The study will allow defining the percentage of ore to be reamed during the life of the mine to increase recovery sequentially.

 

Regarding irrigation, alternatives that allow an efficient use of water should be reviewed, considering the irrigation of the lateral areas of the piles to increase the recovery of iodine and nitrates.

 

A relevant aspect is the incorporation of seawater in the process, a decision that is valued given the current water shortage and that ultimately is a contribution to the project, however, a study should be made of the impact of processing factors such as impurities from this source.

 

It is advisable to carry out tests to identify the hydrogeological parameters that govern the behavior of the water inside the pile. Review the properties of the mineral bed, which acts as a protector of the binders at the base of the piles, which is currently a fine material called "chusca", which could be replaced by classified particulate material, favoring the infiltration of the solutions.

 

It is considered important to evaluate the leachable material through heap leaching simulation, which allows the construction of a conceptual model of caliche leaching with a view to secondary processing of the riprap to increase the overall recovery.

 

SQM TRS Nueva Victoria Pag. 269

 

 

 

 

It is contributive and relevant to work on the generation of models that represent heap leaching, the decrease in particle size (ROM versus Scarious granulometry) and, therefore, of the whole heap and the simultaneous dissolution of different species at different rates of nitrate iodine extraction.

 

With respect to generating material use options, detailed geotechnical characterization of the available clays within the mine property boundaries is suggested to assess whether there are sufficient clay materials on site to use as a low permeable soil liner bed under the leach pad.

 

Environmental issues include leachate or acid water management, air emissions management, tailings dump management, and leachate riprap.

 

All the above recommendations are considered within the declared CAPEX/OPEX and do not imply additional costs for their execution.

 

SQM TRS Nueva Victoria Pag. 270

 

 

 

 

24References

  

Chong, G., Gajardo, A., Hartley, A., Moreno, T. 2007. Industrial Minerals and rocks. In Moreno, T. & Gibbons, W. (eds) The Geology of Chile 7, 201-214

 

Ericksen, G.E. 1981. Geology and origin of the Chilean nitrate deposits. U.S. Geological Survey Professional Paper 1188-B.

 

Fiesta, B. 1966. El origen del salitre de Chile. Sociedad Española de Historia Natural Boletín, Sección Geológica 64(1), 47-56.

 

Mueller, G. 1960. The theory of formation of north Chilean nitrate deposits through ((capillary concentration)). International Geological Congress, 21st, Copenhagen 1960, Report 1, 76-86.

 

Pueyo, J.J.; Chong, G.; Vega, M. 1998. Mineralogía y evolución de las salmueras madres en el yacimiento de nitratos Pedro de Valdivia, Antofagasta, Chile. Revista Geológica de Chile, Vol. 25, No. 1, p. 3-15.

 

Reich, M., Snyder, G.T., Alvarez, F., Pérez, A., Palacios, C., Vargas, G., Cameron, E.M., Muramatsu, Y., Fehn, U. 2013. Using iodine to constrain supergen uid sources in arid regions: Insights from the Chuquicamata oxide blanket. Economic Geology 108, 163-171.

 

Reich, M.,Bao,H. 2018. Nitrate Deposits of the Atacama Desert: A Marker of Long-Term Hyperaridity. Elements, Vol. 14, 251–256

 

SQM TRS Nueva Victoria Pag. 271

 

 

 

 

25Reliance on Information Provided by Registrant

 

The qualified person has relied on information provided by the registrant in preparing its findings and conclusions regarding the following aspects of modifying factors:

 

1)Macroeconomic trends, data, and assumptions, and interest rates.

 

2)Mine and process operating costs.

 

3)Projected sales quantities and prices.

 

4)Marketing information and plans within the control of the registrant.

 

5)Environmental and social licenses

 

SQM TRS Nueva Victoria Pag. 272