Empire Resorts, Inc. (“Empire,” and, together with its subsidiaries, the “Company,” “us,” “our” or “we”) was organized as a Delaware corporation on March 19, 1993, and since that time has served as a holding company for various subsidiaries engaged in the hospitality and gaming industries. All share and per share information in this annual report on Form 10-K gives retroactive effect to a one-for-five reverse stock split effective as of December 23, 2015.

Through Empire’s wholly-owned subsidiary, MRMI, the Company currently owns and operates Monticello Casino and Raceway, a 45,000 square foot VGM and harness horseracing facility located in Monticello, New York, 90 miles northwest of New York City. Monticello Casino and Raceway operates 1,110 VGMs, which includes 1,070 video lottery terminals ("VLTs") and 40 electronic table game positions ("ETGs"). VGMs are similar to slot machines, but they are connected to a central system and report financial information to the central system. The 2015-2016 New York State Budget (the "Budget") expands the statutory definition of Video Lottery Gaming which enables MRMI to operate ETGs of the games of blackjack and 3-card poker. MRMI has added ETGs of the games of blackjack and 3-card poker to its facility and will add other games as they are approved by the NYSGC (defined below). The Company also generates racing revenues through pari-mutuel wagering on the running of live harness horse races, the import simulcasting of harness and thoroughbred horse races from racetracks across the country and internationally, and the export simulcasting of its races to offsite pari-mutuel wagering facilities.
In a letter dated February 12, 2016, the New York State Gaming Commission (the "NYSGC") assigned to MRMI the race dates requested through April 2016. Generally, the annual license renewal process requires the NYSGC to review the financial responsibility, experience, character and general fitness of MRMI and its management.
On December 21, 2015, our wholly-owned subsidiary, Montreign Operating Company, LLC ("Montreign"), was awarded a license (a “Gaming Facility License”) by the NYSGC to operate a resort casino (“Montreign Resort Casino” or the ("Casino Project") to be located at the site of a four-season destination resort planned for the Town of Thompson in Sullivan County 90 miles from New York City (“Adelaar” or the “Adelaar Project”), which is described below. The award of the Gaming Facility License follows the Company’s selection in December 2014 by the New York State Gaming Facility Location Board (the “Siting Board”) as the sole Hudson Valley - Catskills Area casino applicant eligible to apply to the NYSGC for a Gaming Facility License. The Gaming Facility License became effective on March 1, 2016 (the "License Award Effective Date").

Liquidity

The accompanying consolidated financial statements have been prepared on a basis that contemplates the realization of assets and the satisfaction of liabilities and commitments in the normal course of business. The Company anticipates that its current cash and cash equivalents balances and cash generated from operations will be sufficient to meet working capital requirements, excluding expenditures on the Development Projects (as defined below), for at least the next twelve months. To finance a portion of the Development Projects expenses, the Company consummated the January 2016 Rights Offering, from which the Company received net proceeds of $285.9 million. To complete the Development Projects, the Company will need to raise additional funds in support of the development of the Casino Project, the Entertainment Village and the Golf Course (collectively the “Development Projects”). Whether these resources are adequate to meet the Company’s liquidity needs beyond that period will depend on the Company’s growth and operating results and the progress of the Development Projects. To raise the additional capital necessary for the Development Projects, we may seek to enter into strategic agreements, joint ventures or similar agreements or we may sell additional debt or equity in public or private transactions, including pursuant to the Credit Suisse Commitment. The sale of additional equity could result in additional dilution to the Company’s existing stockholders and financing arrangements may not be available to us, or may not be available in amounts or on acceptable terms.

As of December 31, 2015, we had total current assets of approximately $13.8 million and current liabilities of approximately $20.5 million. As of December 31, 2015, our total assets included approximately $15.5 million of remaining net proceeds from the January 2015 Rights Offering (as defined and discussed below) which are presented on the balance sheet as a non-current asset. In the twelve months ended December 31, 2015, we expensed $32.5 million of development costs and capitalized approximately $10.4 million for the Development Projects, of which $34.0 million was paid through December 31, 2015.

We have had continuing net losses and negative cash flow from operating activities, including a loss from operations of$34.0 million for the twelve months ended December 31, 2015. The net losses for the twelve months ended December 31, 2015 were primarily related to the Company’s expenditures with respect to the Development Projects in the amount of $32.5 million, which expenses could not be capitalized unless and until the Company was awarded a Gaming Facility License. As a result of being awarded the Gaming Facility License, the Company began capitalizing the expenditures on the Casino Project, as well as the Entertainment Village and Golf Course, during the fourth quarter 2015.

In fiscal year 2015, total Development Projects costs incurred were approximately $42.9 million. Of this amount, $32.5 million was expensed and consisted of $2.7 million in legal, consultants and other professional services, $4.6 million of non-refundable payments pertaining to the Option Agreement with EPR, $24.2 million in architectural, engineering fees, construction manager costs and subcontractor costs, and $975,000 payment to Kien Huat for a commitment fee pursuant to the Second Amendment to the Commitment letter. The $42.9 million includes $10.4 million of capitalized project development costs during 2015.

In fiscal year 2014, the Casino Project development costs incurred were approximately $12.2 million and consisted of $5.1 million in legal, construction manager costs, consultants and other professional services, $3.1 million of non-refundable payments pertaining to the Option Agreement with EPR, $2.1 million in architectural fees, $1.0 million payment for the RFA application fee, and a $900,000 payment to Kien Huat for a commitment fee pursuant to the Commitment Letter.

In fiscal year 2013, the Adelaar Project and Casino Project development costs expensed were approximately $18.0 million. The $18.0 million consisted of $10.4 million in architectural fees, $1.9 million for shared development expenses with EPR, $2.3 million in legal, $1.0 million in construction manager costs, $900,000 in consultants and other professional services, and $1.5 million of non-refundable payments pertaining to the Option Agreement with EPR.

Following the Company’s selection by the Siting Board to apply to the NYSGC for a Gaming Facility License, the Company submitted to the NYSGC the Upgraded Casino Plan and the Amended Adelaar Plan. The Upgraded Casino Plan and the Amended Adelaar Plan, which are the basis for the Gaming Facility License the Company was awarded, requires that we invest, or cause to be invested no less than approximately $854 million ("Minimum Capital Investment") in the development of the initial phase of Adelaar in accordance with the submitted plans for Montreign Resort Casino and Adelaar.

The Gaming Facility License became effective on March 1, 2016. The Gaming Facility License is subject to certain conditions established by the NYSGC, which conditions, in addition to the Minimum Capital Investment, require Montreign, and any successors and assigns, among other things, to (i) pay an aggregate license fee of $51 million within 30 days of the License Award Effective Date; and (ii) deposit via cash or bond 10% of the Minimum Capital Investment on the License Award Effective Date. The Company's portion of the Minimum Capital Investment is approximately $651.4 million for the Casino Project, the Golf Course and Entertainment Village. On March 1, 2016, the Minimum Capital Investment Deposit, in the aggregate amount of $85.4 million, was made. Montreign's portion of the Minimum Capital Investment Deposit was made in the form of a deposit bond representing approximately $65 million, which is 10% of the Company's Minimum Capital Investment in the Casino Project, Golf Course and Entertainment Village.

To support the Upgraded Casino Plan and the expenses related to the development of the Golf Course and Entertainment Village, the Company entered into amendments to the debt and equity financing commitments initially obtained in June 2014 in support of Montreign’s application for a Gaming Facility License. For the debt portion of the Company’s financing, in June 2014, Credit Suisse committed to provide the CS Credit Commitment of up to a maximum amount of $478 million. On September 22, 2015, Credit Suisse and the Company entered into a further amendment to the CS Credit Commitment increasing the financing commitment Credit Suisse provided up to a maximum of $545 million, which amount may be reduced by no more than $70 million depending on the amount of furniture, fixtures and equipment financing the Company otherwise obtains. The CS Credit Commitment provides that it may change the terms of the credit facility to ensure successful syndication. The CS Credit Facility is subject to various conditions precedent, including evidence of an equity investment in Company of not less than $301 million, of which $50 million was raised in a rights offering conducted by the Company in the 2015 and $290 million was raised in a rights offering conducted by the Company in 2016. The Company obtained the CS Credit Commitment to demonstrate its ability to finance the costs and expenses of the Casino Project. However, the Company has reserved the flexibility to reassess financing alternatives and either proceed with the debt financing described herein or pursue alternative means of debt financing on terms and conditions more beneficial to the Company, subject to payment of a fee to Credit Suisse.

For the equity investment portion of the Company’s financing for the Development Projects and to redeem the outstanding Series E Preferred Stock in accordance with an existing settlement agreement, in June 2014, the Company and Kien Huat entered into the Commitment Letter. Pursuant to the Commitment Letter, Kien Huat initially agreed to participate in, and backstop, a rights offering in an amount up to $150 million plus the amount needed to redeem the Series E Preferred Stock if the Company commenced a rights offering on the terms described in the Commitment Letter in support of the Casino Project. For such commitment, the Company agreed to pay Kien Huat a fee of 1.0% of the maximum amount raised, of which 0.5% was paid upon execution of the Commitment Letter and the remaining 0.5% being due if a rights offering was launched. In addition, the Company agreed to pay for or reimburse Kien Huat for all of its out-of-pocket expenses in connection with the negotiation, execution and delivery of the Commitment Letter and the consummation of the transactions contemplated thereby. In partial satisfaction of Kien Huat’s obligations pursuant to the Commitment Letter, Kien Huat participated in, and backstopped, the January 2015 Rights Offering (as defined below) in the amount of $50 million. The proceeds of the January 2015 Rights Offering were used for the expenses relating to the pursuit of the Gaming Facility License for the Casino Project and for development purposes. The Company paid Kien Huat a portion of the commitment fee described in the Commitment Letter in the amount of $250,000 (representing 0.5% of the $50 million amount raised in the January 2015 Rights Offering) and reimbursed Kien Huat for its expenses in an amount of $40,000.

To support the Upgraded Casino Plan, the expenses related to the development of the Golf Course and Entertainment Village, to redeem the Series E Preferred Stock and to provide working capital for the Company, the Company and Kien Huat entered into a second amendment to the Commitment Letter (the “Second Amendment” or the “Second Amendment to the Commitment Letter”) on September 22, 2015. Pursuant to the Second Amendment to the Commitment Letter, Kien Huat increased its overall equity investment commitment to the Company from $150 million plus the amount necessary to redeem the Series E Preferred Stock to an aggregate total of $375 million, which amounts include the $50 million invested in the January 2015 Rights Offering. In particular, Kien Huat agreed to participate in, and backstop, two additional rights offerings, the first of which is the January 2016 Rights Offering, which Kien Huat has agreed to backstop in an amount not to exceed $290 million. Kien Huat also agreed to participate in, and backstop, a follow-on rights offering on the same terms and conditions and at the same subscription price as the January 2016 Rights Offering, in an amount not to exceed $35 million (the "Follow-On Rights Offering"). Except for the increase in the overall commitment amount, the terms and conditions of the Commitment Letter remain unchanged.

On January 5, 2016, the Company commenced a rights offering for aggregate gross proceeds of $290 million. In connection with the January 2016 Rights Offering, on December 31, 2015, the Company and Kien Huat entered into a standby purchase agreement (the “January 2016 Standby Purchase Agreement”). Pursuant to the January 2016 Standby Purchase Agreement, Kien Huat agreed to exercise its basic subscription rights and to exercise all rights not otherwise exercised by the other holders in an aggregate amount not to exceed $290 million. Under the January 2016 Standby Purchase Agreement, the Company paid Kien Huat a portion of the commitment fee described in the Commitment Letter in the amount of $1,450,000 and reimbursed Kien Huat for its expenses in an amount not exceeding $50,000. The January 2016 Rights Offering closed on February 17, 2016. See Note H, "Stockholders' Equity," for additional information about the January 2016 Rights Offering.

On January 5, 2015, the Company commenced a rights offering (the “January 2015 Rights Offering”) for aggregate gross proceeds of $50 million to raise a portion of the equity financing necessary to develop the Casino Project. In partial satisfaction of Kien Huat's obligations pursuant to the Commitment Letter, in connection with the January 2015 Rights Offering, on January 2, 2015, the Company and Kien Huat entered into a standby purchase agreement (the “January 2015 Standby Purchase Agreement”). Pursuant to the January 2015 Standby Purchase Agreement, Kien Huat agreed to exercise in full its basic subscription rights granted in the January 2015 Rights Offering within ten (10) days of its grant. In addition, Kien Huat agreed it would exercise all rights not otherwise exercised by the other holders in an aggregate amount not to exceed $50 million. Under the January 2015 Standby Purchase Agreement, the Company paid Kien Huat a portion of the commitment fee described in the Commitment Letter in the amount of $250,000 and reimbursed Kien Huat for its expenses in an amount not exceeding $40,000. The January 2015 Rights Offering closed on February 6, 2015. The Company issued a total of 1,408,451 shares of common stock at $35.50 per share. This includes 10,658 shares issued to holders upon exercise of their basic subscription and over-subscription rights and 864,360 shares issued to Kien Huat upon exercise of its basic subscription rights. Kien Huat also acquired the remaining 533,433 shares not sold in the January 2015 Rights Offering pursuant to the January 2015 Standby Purchase Agreement. The Company received net proceeds of approximately $49.5 million, which were used for the expenses relating to the pursuit of the Gaming Facility License and are being used for development purposes relating to the Casino Project.    

On April 2, 2014, the Company commenced a rights offering of common stock to holders of its common stock and Series B Preferred Stock (the "April 2014 Rights Offering"). The Company distributed to its common stock holders and Series B Preferred Stock holders one (1) non-transferable right to purchase one (1) share of common stock at a subscription price of $31.25 per share for each fifteen shares of common stock owned, or into which their Series B Preferred Stock was convertible, on March 31, 2014, the record date for the April 2014 Rights Offering. In addition to being able to purchase their pro rata portion of the shares offered based on their ownership as of March 31, 2014, stockholders were able to oversubscribe for additional shares of common stock. Upon completion of the April 2014 Rights Offering, the Company issued 427,776 shares of common stock and raised approximately $13.4 million. This includes 90,633 shares issued to holders upon exercise of their basic subscription rights, 302,526 shares issued to Kien Huat upon exercise of its basic subscription rights and 34,617 shares issued to holders upon exercise of their over-subscription rights in the April 2014 Rights Offering. The Company utilized the net proceeds of approximately $13.2 million for certain expenses relating to (i) the Adelaar Project and Casino Project; (ii) maintaining our on-going operations and facilities; and (iii) support of our pursuit of a Gaming Facility License.

We may also seek to enter into other strategic agreements, joint ventures or similar agreements or we may sell additional debt or equity in public or private transactions in support of the Casino Project and our ongoing operations. On January 3, 2014, we filed the S-3, which was declared effective on February 12, 2014, covering the offer and sale of up to $250 million of our securities. As of March 7, 2016, we had up to approximately $83.7 million available for future issuances under the S-3. However, because the Company's public float is less than $75 million as of the date of this filing, we will be limited in the amount of securities we may sell under the S-3 to an amount no greater than one third our public float. This amount of availability is sufficient to complete the Follow-On Rights Offering. This amount of availability is sufficient to complete the Follow-On Rights Offering.The sale of additional equity will result in additional dilution to the Company’s existing stockholders and financing arrangements may not be available to the Company, or may not be available in amounts or on terms acceptable to the Company.

On March 3, 2015, the Company and Kien Huat entered into Amendment No. 3 (the "Third Amendment") to the Loan Agreement, dated November 17, 2010 and amended on August 8, 2012 and December 18, 2013 (the "Loan Agreement"). Pursuant to the Third Amendment, among other things, the maturity date of the Kien Huat Note was extended from March 15, 2015 to March 15, 2016. Additionally, pursuant to the Third Amendment, the Loan Agreement was amended to add the denial to issue a Gaming Facility License to the Company as an Event of Default. Pursuant to the terms of the Commitment Letter and the Loan Agreement, upon consummation of the January 2016 Rights Offering, the Kien Huat Note was converted into 1,332,058 shares of our common stock, which conversion, along with the payment in cash of interest due, satisfied the Kien Huat Note in full (the "Conversion"). See Note F, "Long Term Loan, Related Party," for additional information about the Note Conversion.
Recent Events    

Letter Agreement

As a result of Kien Huat’s increased proportionate ownership following the consummation of the January 2016 Rights Offering and the conversion of the Kien Huat Note, at the request of the Company, on February 17, 2016, Kien Huat and the Company entered a letter agreement (the “Letter Agreement”) pursuant to which, during the period commencing on February 17, 2016 and ending on the earlier of (i) the three year anniversary of the closing of the January 2016 Rights Offering and (ii) the one year anniversary of the opening of the Casino Project, Kien Huat has agreed not to take certain actions with respect to the Company. In particular, during such time period, Kien Huat has agreed not to, and to cause its affiliates other than the Company or its subsidiaries (collectively with Kien Huat, “Kien Huat Parties”) not to, take certain actions in furtherance of a “going-private” transaction (as such term is defined in the Letter Agreement) involving the Company unless such transaction is subject to the approval of (x) holders of a majority of the votes represented by the common stock, Series B preferred stock and any other capital stock of the Company entitled to vote together with the common stock in the election of the board of directors (the “Board”) of the Company (other than any such capital stock owned by any Kien Huat Parties) and (x) either (A) a majority of disinterested members of the Board or (y) a committee of the Board composed of disinterested members of the Board. In addition, during such period, the Company and Kien Huat have agreed to cooperate to ensure that, to the greatest extent possible, the Board includes no fewer than three (3) independent directors (the definition of independence as determined under the standards of The Nasdaq Stock Market or any other securities exchange on which the common stock of the Company is then listed).
Monticello Casino and Raceway
Monticello Casino and Raceway began racing operations in 1958 and currently features:
1,070 VLTs and 40 ETGs (collectively 1,110 VGMs);
year-round live harness horse racing;
year-round simulcast pari-mutuel wagering on thoroughbred and harness horse racing from around the world;
a 3,000-seat grandstand with retractable windows and a 100-seat clubhouse;
parking spaces for 2,000 cars and 10 buses;
a buffet and two outlet food court with seating capacity for up to 350 patrons;
a 3,800 square foot multi-functional space used for events;
a casino bar and an additional clubhouse bar; and
an entertainment lounge with seating for 75 patrons.
VGM Operations
We currently operate a 45,000 square foot VGM facility known as Monticello Casino and Raceway. Revenues derived from our VGM operations consist of VGM revenues and related food and beverage revenues. The VGMs are owned by the State of New York. By statute, from April 1, 2008 until March 31, 2016, 41% of gross VGM revenue is distributed to us. Unless the 2016-2017 State Budget, which we anticipate will be adopted by March 31, 2016, contains a provision to extend this share percentage of gross VGM revenue to March 31, 2017, effective as of April 1, 2016, 39% of gross VGM revenue will be distributed to us. Gross VGM revenues consist of the total amount wagered at our VGMs, less prizes awarded. The statute provides a marketing allowance for racetracks operating video lottery programs of 10% on the first $100 million of net revenues generated and 8% thereafter. Video lottery gaming shall only be permitted for no more than twenty consecutive hours per day and on no day shall such operation be conducted past 6:00 a.m.
VGM activities in the State of New York are overseen by the NYSGC.
Raceway Operations
We derive our racing revenue principally from:
wagering at Monticello Casino and Raceway on live races run at Monticello Casino and Raceway;
fees from wagering at out-of-state locations and internationally on races run at Monticello Casino and Raceway using export simulcasting;
revenue allocations, as prescribed by law, from betting activity at off-track betting facilities in the State of New York;
wagering at Monticello Casino and Raceway on races broadcast from out-of-state racetracks using import simulcasting; and
program and certain other ancillary activities.
Simulcasting
Import and, particularly, export simulcasting, are an important part of our business. Simulcasting is the process by which a live horse race held at one facility (the “host track”) is transmitted to another location that allows patrons of such other location to wager on that race. Amounts wagered at each off-track betting location are combined into the appropriate pools at the host track’s tote facility where the final odds and payouts are determined. With the exception of a few holidays, we offer year-round simulcast wagering from racetracks across the country, including Aqueduct, Belmont, Meadowlands Racetrack, Penn National Race Course, Turfway Park, Santa Anita Racetrack, Gulfstream Park and Saratoga Racecourse. In addition, races of national interest, such as the Kentucky Derby, Preakness Stakes and Breeders’ Cup supplement our regular simulcast programming. We also export live broadcasts of our own races to race tracks, casinos and off-track betting facilities in the United States, Canada, Germany, Austria, Isle of Man, Mexico, South America and the United Kingdom.

On November 3, 2014, MRMI and the Monticello Harness Horsemen’s Association (the “MHHA") entered into an agreement that governs the conduct of MRMI and MHHA relating to horseracing purse payments, the simulcasting of horse races and certain other payments (the "2014 MHHA Agreement"). The 2014 MHHA Agreement had an initial term of two (2) years. However, because Montreign was awarded a Gaming Facility License, the 2014 MHHA Agreement was extended for an additional seven (7) years beginning on the date that the NYSGC approves the Casino Project to engage in legalized gaming. On that same date, MHHA will also receive 200,000 shares of Empire common stock and a warrant to purchase 60,000 shares of common stock, the proceeds of any sales of which will provide additional monies for the harness horsemen’s purse account.
Pari-mutuel Wagering
Our racing revenue is derived from pari-mutuel wagering at our track and government mandated revenue allocations from certain New York State off-track betting locations. In pari-mutuel wagering, patrons bet against each other rather than against the operator of the facility or with pre-set odds. The amounts wagered form a pool of funds from which winnings are paid based on odds determined by the wagering activity. The racetrack acts as a stakeholder for the wagering patrons and deducts from the amounts wagered a “take-out” or gross commission from which the racetrack pays state and county taxes and racing purses. Our pari-mutuel commission rates are fixed as a percentage of the total handle or amounts wagered.
Raceway Operations, Simulcasting and Pari-mutuel Wagering activities in the State of New York are overseen by the NYSGC.
Adelaar and Montreign Resort Casino
The Adelaar Project is to be located on approximately 1,700 acres (the “EPT Property”) owned by EPT Concord II, LLC (“EPT”) and EPR Concord II, L.P. (“EPR LP”) two wholly-owned subsidiaries of EPR Properties (“EPR”). Montreign Resort Casino is part of the initial phase of the Adelaar Project, which will also include an Indoor Waterpark Lodge (the "Waterpark"), Rees Jones redesigned “Monster” Golf Course (the “Golf Course”) and an Entertainment Village, which will include retail, restaurant, shopping and entertainment (the “Entertainment Village”and, together with the Casino Project, the Waterpark, the Golf Course and the Entertainment Village, the “Initial Projects”). Although construction has commenced, over the past four years, the Company has expended substantial time and resources on designing Montreign Resort Casino and, in conjunction with EPR, working with local, state and federal agencies and officials to obtain necessary permits and approvals for construction of the Initial Projects.
Montreign Resort Casino
Montreign Resort Casino,is designed to meet 5-star and 5-diamond standards and is expected to include:

A 90,000 square foot casino floor featuring 2,150 slot machines, 102 table games and a 1416 table poker room (inclusive of the poker room and VIP and high-limit areas);
Designated VIP/high-limit areas within such gaming floor which will offer a minimum of 26 slot machines, 8 table games, and a player’s lounge offering food and beverage;
An 18 story hotel tower containing 332 luxury rooms (including at least eight 1,0001,200 square foot garden suites, seven 1,800 square foot, two story townhouse villas, and 12 penthouse-level suites), indoor pools and fitness center;
A VIP floor containing 6 private VIP gaming salons, a private gaming cage, and butler service;
27,000 square feet of multi-purpose meeting and entertainment space with seating capacity for 1,300 people and a mezzanine level that includes the 14 -16 table poker room, access to outdoor terraces and approximately 7,000 square feet of meeting room space;
A 7,500 square foot spa located at the VIP level; and
Seven restaurants and four bars.
Gaming Facility License

The Gaming Facility License will be effective on the License Award Effective Date. The Gaming Facility License will have an initial duration of ten years from the License Award Effective Date. It shall be renewable thereafter for a period of at least an additional ten years, as determined by the NYSGC. The Gaming Facility License is also subject to certain conditions established by the NYSGC, which conditions require Montreign, and any successors and assigns, to:
•     pay an aggregate license fee of $51 million within 30 days of the License Award Effective Date;
deposit via cash or bond 10% of the Minimum Capital Investment (as defined below) on the License Award Effective Date (the "Minimum Capital Investment Deposit");
invest, or cause to be invested, no less than approximately $854 million (the “Minimum Capital Investment”) in the development of the initial phase of Adelaar in accordance with the submitted plans for Montreign Resort Casino and Adelaar;
own or acquire, including by lease, the land where Montreign Resort Casino will be built within 60 days of the License Award Effective Date;
•     fulfill substantially the commitments and execute the submitted plans for Montreign Resort Casino and Adelaar;
commence gaming operations within 24 months following the License Award Effective Date upon the NYSGC’s approval to open Montreign Resort Casino for gaming following a determination that the submitted plans for Montreign Resort Casino has been substantially completed in accordance with the construction plans, specifications and timelines submitted by Montreign;
comply with Article 15-A of the Executive Law and minority and woman business enterprise requirements and regulations for Montreign Resort Casino capital projects;
take all reasonable steps to obtain and comply in all material respects with all permits and zoning approvals required for the initial phase of the Adelaar Project;
maintain and comply in all material respects with the terms and conditions of agreements relating to live entertainment agreements; project labor agreements; labor peace agreements; cross-marketing agreements with local partners; and affirmative action program agreements, with notice and a reasonable opportunity to cure any defects or failures to comply;
create a minimum of 1,425 full time jobs and 96 part time jobs and undertake to establish workforce development and affirmative action programs that conform, at a minimum to the programs submitted by Montreign that comply with applicable regulations;
undertake to establish a problem gambling program conforming, at a minimum, to the program submitted by Montreign that complies with applicable regulations;
within 30 days of the Award Date and thereafter on a quarterly basis, update the NYSGC on the status of certain litigation to which Montreign or certain entities and individuals that are required to be qualified by the NYSGC is a party;
comply with debt to equity ratios to be established by the NYSGC;
promptly inform the NYSGC of any declared default or any failure to meet any material payment of interest or principal when due under any existing or future debt;
provide written notification to the NYSGC if Montreign intends to refinance existing debt or incur additional capital debt of $50 million or more during any consecutive twelve-month period;
comply with NYSGC regulations concerning the submission of audited financial statements;
submit to the NYSGC at least 90 days prior to the anticipated opening date of Montreign Resort Casino and thereafter implement and maintain a plan to comply with the federal anti-money laundering statute and applicable regulations; and
apply for a casino alcoholic beverage license in accordance with applicable regulations.
Golf Course and Entertainment Village

Our subsidiaries are responsible for the development and construction of the Golf Course and the Entertainment Village. The development of the Entertainment Village is expected to be built-out in phases with the initial phase being approximately 50,000 square feet. If full build-out occurs, the Entertainment Village will be approximately 150,000-200,000 square feet, depending on market demand. We have agreed to invest a minimum of $15 million in the development and construction of the Golf Course and $25 million in the development and construction of the Entertainment Village. The Company is currently preparing the design plans for the Entertainment Village. The redesign of the Golf Course has been approved by the Company and construction work has begun.
Master Development Agreement and Completion Guaranties

On December 28, 2015 (the “MDA Effective Date”), Montreign, Empire Resorts Real Estate I, LLC (“GC Tenant”) and Empire Resorts Real Estate II LLC (“EV Tenant," and together with Montreign and GC Tenant, the “Project Parties”), each a wholly-owned subsidiary of the Company, on the one hand, and EPT, EPR LP and Adelaar Developer, LLC (“Adelaar Developer,” together with EPT and EPR LP collectively, “EPR”), on the other hand, entered into an Amended and Restated Master Development Agreement (as amended, the “MDA”), which amends and restates that certain master development agreement by and between EPT and MRMI originally executed on December 14, 2012. The MDA defines and governs the overall relationship between EPR and the Project Parties with respect to the development, construction, operation, management and disposition of Adelaar. The MDA generally provides that the development of Adelaar will comply with all requirements set forth in the Gaming Facility License. The term of the MDA, as amended, commenced on the MDA Effective Date and, with the exception of certain provisions relating to the operation of the facilities which survive for the term of the Gaming Facility License, shall expire on the earlier to occur of the (i) the completion and opening to the general public for business of the Initial Projects and (ii) sooner termination pursuant to the terms of the MDA, as described below.

In accordance with the terms of the MDA, the Project Parties shall each be responsible for the development and construction of their portion of the Initial Projects. Montreign is responsible for the Casino Project, GC Tenant is responsible for the Golf Course and EV Tenant is responsible for the Entertainment Village. The Project Parties have agreed to invest a minimum of $611 million in the development and construction of the Casino Project, $15 million in the development and construction of the Golf Course and $25 million in the development and construction of the Entertainment Village. The Project Parties have agreed to construct the Casino Project, Golf Course and Entertainment Village such that each project is completed within the project schedule agreed to by the parties (the “Project Schedule”). During the term of the Gaming Facility License, the Project Parties will be responsible for maintaining and operating the Casino Project, Golf Course and Entertainment Village in material compliance with all requirements set forth in the Gaming Facility License. In connection with the MDA, on December 28, 2015, Empire entered into a Completion Guaranty, guaranteeing completion of the development and construction obligations of the Project Parties described in this paragraph.

In accordance with the terms of the MDA, EPR is responsible for the development and construction of the Waterpark and the common infrastructure-related improvements (such as streets, sidewalks, sanitary and storm sewer lines, water, gas, electric, telephone and other utility lines, systems, conduits and other similar facilities) that are required to be constructed to enable the Initial Projects to be open and fully operational in accordance with the Project Schedule (the “Infrastructure”). EPR has agreed to be responsible for the development and construction of the Waterpark with a minimum capital investment of $120 million, and the Infrastructure. EPR plans to finance the costs of the Infrastructure through tax exempt bonds issued by a local development corporation. The debt service for the Infrastructure Bonds will be funded through special district tax assessments, a portion of which will be allocated to the Empire Project Parcels (as defined below). EPR and the Project Parties have agreed to a capped dollar amount for each of the Empire Project Parcels (the “Empire Cap”) above which the Project Parties shall not be responsible. Furthermore, EPR has agreed to construct the Waterpark and the Infrastructure in accordance with the Project Schedule. On December 28, 2015, EPR Properties, a real estate investment trust and the parent company of EPR, entered into a Completion Guaranty, guaranteeing completion of the development and construction obligations of EPR described in this paragraph.

Neither party has the right to terminate the MDA unless both (a) the Casino Lease (as defined below) terminates prior to the Commencement Date (defined below) in accordance with its terms and (b) Montreign fails to exercise the Purchase Option (as defined below) prior to its expiration in accordance with the terms and conditions of the Purchase Option Agreement (as defined below).

Empire Project Parcel Leases and Purchase Option Agreement

On December 21, 2011, MRMI entered into an option agreement with EPT, which was last amended by a letter agreement dated June 20, 2014, between EPT and MRMI (as amended, the “Option Agreement”). Pursuant to the Option Agreement, EPT granted us a sole and exclusive option (the “Option”) to lease the parcel on which Montreign Resort Casino would be built (the "Casino Parcel") pursuant to the terms of a form of casino lease negotiated between the parties. Among other things, the Option Agreement also reflected the parties' agreement of when the Company must decide whether it would lease the Casino Parcel for purposes of constructing the Casino Project. The Option Agreement also provided the Company the ability to extend the date by which it would be required to make that decision in consideration for monthly option payments (the "Option Payments") that increased every twelve months. The Company made Option Payments to EPT of $750,000 and $472,603, on December 21, 2011 and March 8, 2013, respectively. In September 2013, the Board of Directors of EPT acted to provide an irrevocable notice to proceed with the development of the Casino and the Company's Board of Directors acted to waive the Company's right to terminate the MDA. As a result, pursuant to the terms of the Option Agreement, the aggregate Option Payments of $1,222,603 made prior to September 2013 became non-refundable. In addition to the $1,222,603 paid prior to September 2013, we made additional Option Payments expense of approximately $3.1 million and approximately $4.6 million in 2014 and 2015, respectively. The Option Agreement also granted the Company the option to purchase the Casino Parcel, together with the other property owned by EPT at the site of the former Concord Resort at the purchase prices described in the Option Agreement.

On September 3, 2015, MRMI and EPT entered into a non-binding term sheet (the “Term Sheet”) reflecting general terms of a proposed amendment to the Option Agreement. The Term Sheet contemplated, among other things, amendments to the Option Agreement that would require MRMI and/or its affiliates to lease the parcels containing the Golf Course (the "Golf Course Parcel") and Entertainment Village (the "Entertainment Village Parcel" and, together with the Casino Parcel and the Golf Course Parcel, the "Empire Project Parcels") in addition to the Casino Project Parcel. The Term Sheet also contemplates a separate purchase option agreement granting MRMI and/or its affiliates the right to purchase all three, but not less than all three, of the Empire Project Parcels. As a result, on December 28, 2015, the Project Parties entered into the Casino Lease, the Golf Course Lease, the Entertainment Village Lease (as these terms are defined below), each of which is substantially similar to the form of casino lease attached to the Option Agreement, and the Purchase Option Agreement (each as defined and described below), which collectively supersede the Option Agreement. In addition, the Option Payments made by the Company pursuant to the Option Agreement, which aggregate to a total of $8.5 million, shall be applied against rent amounts due to EPT as rent under the Casino Lease as more fully described below.
    
Casino Lease

On December 28, 2015 , Montreign entered into a lease (the “Casino Lease”) with EPT for the lease of the Casino Parcel. The Casino Lease has a term that expires on the earlier of: (i) March 31, 2086, and (ii) upon Montreign giving EPT written notice of its election to terminate the Casino Lease (the “Termination Option”) at least twelve (12) months prior to any one of five Option Dates (as defined below). The option dates (each an "Option Date") under the Casino Lease mean each of the twentieth (20th), thirtieth (30th), fortieth (40th), fiftieth (50th) and sixtieth (60th) anniversaries of the commencement of the Casino Lease. Upon Montreign's timely notice of exercise of its Termination Option, the Casino Lease shall be automatically terminated effective as of the applicable Option Date.

The annual fixed rent payments under the Casino Lease are as follows: (i) prior to March 1, 2016, Montreign's sole rent obligation under the Casino Lease was to continue making the same payments it would have made under the Option Agreement; (ii) for the first year following March 1, 2016, certain prior payments made under the Option Agreement will be deemed to satisfy all rental obligations under the Casino Lease during this period and so Montreign will have no rental payments due; (iii) beginning March 2017 and continuing through August 2018, annual fixed rent shall equal $1 million per month; and (iv) beginning September 2018 and through the remainder of the term of the Casino Lease (the “Percentage Rent Period”), annual fixed rent shall equal $7.5 million. The annual fixed rent will escalate every five years by eight percent (8%). Montreign is also obligated to pay an annual percentage rent equal to five percent (5%) of the Eligible Gaming Revenue (as such term is defined in the Casino Lease) for the Percentage Rent Period. Additionally, Montreign has an obligation to pay the special district tax assessment allocated to the Casino Parcel, not to exceed the capped dollar amount applicable to the Casino Parcel.

Pursuant to the Casino Lease, Montreign is permitted to use the leased premises solely as a regional destination casino resort, consisting of gaming operations, and the management and operations of all functions as may be necessary or appropriate to conduct the gaming operations. In addition, both EPT and Montreign are required to be in compliance with requirements of gaming authorities and if applicable, other governmental authorities related to the Gaming License and operation of the leased premises. In the event that Montreign is prevented from conducting gaming operations on the Casino Parcel solely due to a failure of the Waterpark Project to materially comply with the Gaming Facility License requirements, Montreign will be entitled to an abatement of annual fixed rent, percentage rent and all other amounts due until the earlier of the date when Montreign is permitted to conduct gaming operations or 30 days following the date Montreign takes over the operations of the Waterpark Project. Montreign is also required to provide EPT with various periodic financial statements and additional information upon EPT’s request.

In the event that EPT desires to sell, transfer, or assign its interests in the Casino Parcel and/or the Casino Lease to a competitor of Montreign (a “Competitor Transfer”), Montreign has the right to exercise its Purchase Option (as defined in the Purchase Option Agreement) solely in connection with the Casino Parcel, in accordance with the terms and conditions of the Purchase Option Agreement at any time following EPT’s delivery of a written notice (“Competitor Transfer Notice”) of no less than 30 days prior to the consummation of the Competitor Transfer and for as long as a competitor is the landlord under the Casino Lease. If Montreign delivers the Buyer’s Purchase Notice (as defined in the Option Purchase Agreement) within 15 days following the delivery of the Competitor Transfer Notice, EPT will be prohibited from consummating the Competitor Transfer and Montreign will acquire the Casino Parcel in accordance with the terms of the Purchase Option Agreement.

The Casino Lease also contains customary provisions allowing the Landlord to terminate the Lease if Montreign fails to remedy a breach of any of its obligations within specified time periods, or upon bankruptcy or insolvency of Montreign or abandonment by Montreign of the leased property for certain period of time.

Golf Course Lease

On December 28, 2015, GC Tenant entered into a sublease (the “Golf Course Lease”) with Adelaar Developer for the lease of the Golf Course Parcel. The terms of the Golf Course Lease are substantially similar to the Casino Lease, subject to the following material differences: (a) there is no percentage rent under the Golf Course Lease, and annual fixed rent is equal to: (i) $0 prior to the date the Golf Course opens for business to the public (the “Golf Course Opening Date”), (ii) $150,000 for the first ten years following the Golf Course Opening Date, and (iii) $250,000 thereafter for the remainder of the term of the Golf Course Lease, plus GC Tenant’s portion of the special district tax assessments relating to the infrastructure up to the capped amount applicable to the Golf Course Parcel, which shall not be assessed against GC Tenant prior to 60 months following the Commencement Date; (b) the Golf Course Lease does not contain any affirmative financial reporting obligations of GC Tenant or an operating covenant of GC Tenant beyond compliance with the Gaming License and other statutory regulations, as required for Montreign to maintain its Gaming License; and (c) an event of default under the Casino Lease triggers an event of default under the Golf Course Lease (but not vice versa) so long as GC Tenant is an affiliate of Montreign.

Entertainment Village Lease

On December 28, 2015, EV Tenant entered into a sublease (the “Entertainment Village Lease”) with Adelaar Developer, for the lease of the Entertainment Village Parcel. The terms of the Entertainment Village Lease are substantially similar to the Casino Lease, subject to the following material differences: (a) there is no percentage rent under the Entertainment Village Lease, and annual fixed rent is equal to: (i) $0 prior to the date any portion of entertainment village first opens for business to the public (the “EV Opening Date”), (ii) $150,000 for the first ten years following the EV Opening Date, and (iii) $250,000 thereafter for the remainder of the term of the Entertainment Village Lease, plus EV Tenant’s portion of the special district tax assessments relating to the infrastructure up to the capped amount applicable to the Entertainment Village Parcel, which shall not be assessed prior to 60 months following the Commencement Date; (b) the Entertainment Village Lease does not contain any financial reporting obligations of EV Tenant or an operating covenant of EV Tenant beyond compliance with the Gaming License and other statutory regulations, as required for Montreign to maintain its Gaming License; and (c) an event of default under the Casino Lease triggers an event of default under the Entertainment Village Lease (but not vice versa) so long as EV Tenant is an affiliate of Montreign.

Purchase Option Agreement

On December 28, 2015, Montreign and EPR entered into a Purchase Option Agreement (the “Purchase Option Agreement”), pursuant to which EPR granted to Montreign the option (the “Purchase Option”) to purchase all, but not fewer than all, of the Empire Project Parcels for a purchase price of $175 million ($200 million after the sixth anniversary of the License Award Effective Date), less a credit of up to $25 million for certain previous payments made by the Project Parties. The Purchase Option commenced on December 28, 2015 and shall expire on the earlier to occur of (i) the natural expiration of the term of the Casino Lease and (ii) 90 days following the earlier termination of the Casino Lease, if otherwise terminated in accordance with its terms (the “Purchase Option Period”).

Under the Purchase Option Agreement, EPR also granted to Montreign the option (the “Resort Project Purchase Option”) to purchase not less than all of the balance of the EPR Property, excluding the Empire Project Parcels and the Waterpark (the “Resort Property”) for an additional fee. The Resort Project Purchase Option may be exercised only simultaneously with or after the exercise of the Purchase Option. The Resort Project Purchase Option commenced on December 28, 2015 and shall expire on the earlier to occur of (a) the expiration of the Purchase Option Period or (b) March 1, 2026.

Under the Purchase Option Agreement, EPR also granted to Montreign a right of first offer (“ROFO”) with respect to all or any portion of the Resort Property. Under the terms of the ROFO, if EPR makes an offer to or rejects an offer made by Montreign, then EPR shall be precluded for a period of six months from transferring the designated portion of the Resort Property at a price and on terms which are on the whole substantially equivalent to or worse than those proposed or accepted by Montreign. The ROFO commenced on the Effective Date and shall continue in full force and effect until EPR has sold,
leased, licensed or otherwise transferred all of the Resort Property.
    

Regulation

VGM and Racing Operations
Our VGM and harness horseracing and simulcast operations are overseen by the NYSGC. The legislation that created the NYSGC provides that the Board of the NYSGC shall consist of seven members. The NYSGC has the authority and responsibility to promulgate rules and regulations that affect the operations of our business. Our VGM, harness horseracing and simulcast activities in the State of New York are overseen by the NYSGC, Division of Lottery and Division of Horse Racing, respectively.

In addition to receiving 41% of our VGM revenue from our operations at Monticello Casino and Raceway through March 31, 2016, the law provides for a subsidized free play allowance of 15%. On July 22, 2014, the Governor signed legislation to amend the New York tax law, in relation to the non-subsidized free play allowance. The law increased the non-subsidized free play allowance from 10% to 15% effective July 22, 2014.
Casino Gaming
    
The Upstate New York Gaming and Economic Development Act ("Gaming Act"), among other things, provides the statutory framework for the regulation of full-scale casino gaming. The Gaming Act authorizes the NYSGC to award up to four (4) Gaming Facility Licenses. Gaming Facilities are authorized in three (3) ming Act authorizes the NYSGC to award up to four (4) Gaming Facility Licenses. Gaming Facilities are authorized in three (3) regions of the state: the Columbia, Delaware, Dutchess, Greene, Orange, Sullivan and Ulster counties, which is referred to as the "Hudson Valley-Catskills Area" and in which we are located; the Albany, Fulton, Montgomery, Rensselaer, Saratoga, Schenectady, Schoharie and Washington counties (the "Capital Region"); and the Broome, Chemung (east of State Route 14), Schuyler (east of State Route 14), Seneca, Tioga, Tompkins, and Wayne (east of State Route 14) counties (the "Finger Lakes Region"). Up to two (2) Gaming Facilities can be located in any of the three(3) regions. The Gaming Act provides that no Gaming Facilities shall be authorized in Bronx, Kings, New York, Queens or Richmond counties. The state may, however, legislatively authorize additional gaming facility licenses.

Further, the Gaming Act authorizes Nassau Off-Track Betting Corporation ("Nassau OTB") and Suffolk Regional Off-Track Betting Corporation ("Suffolk OTB") to file video lottery gaming license applications to establish one (1) VGM facility each, at an Off-Track Betting site operated by Nassau OTB and Suffolk OTB respectively, with a maximum of one thousand (1,000) VGMs at each site.
In accordance with the Gaming Act, the Siting Board is charged with selecting applicants that are qualified to receive a Gaming Facility License and determining the location of such Gaming Facilities. On October 14, 2015, the Siting Board selected an additional applicant for the Finger Lakes Region. On December 21, 2015, the NYSGC granted three Gaming Facilities Licenses, of which we received the license for the Hudson Valley-Catskills Area, and one license was granted in each of the Capital Region and the Finger Lakes Region. The additional Gaming Facility License for the Finger Lakes Region is pending with the NYSGC. There will be a seven (7) year exclusivity period for holders of Gaming Facility Licenses, commencing with the awarding of the license, during which no further Gaming Facilities will be licensed by the NYSGC. If the Legislature authorizes additional Gaming Facility Licenses within this period, licensees shall have the right to recover a pro-rata portion of the license fee paid.
In connection with the Company application for a Gaming Facility License in response to the Siting Board's Request for Application (the "RFA"), we paid to the NYSGC an application fee of $1 million ("Application Fee") to help defray the costs associated with the processing and investigation of our application. However, if the costs of processing, investigation and related costs exceed the Application Fee, we shall be required to pay the additional amount to the NYSGC within thirty (30) days after notification of insufficient fees. If the investigation costs are below the amount of the Application Fee paid, any unexpended portion shall be returned to us.     
In addition to the payment of the Minimum Capital Investment Deposit, which was made on March 1, 2016, we are required to pay a minimum licensing fee within thirty (30) days of the License Award Effective Date, which in our case is $51 million. NYSGC will oversee regulation of our casino gaming operations and our Gaming Facility License will also be subject to the conditions established by the NYSGC, which are more fully discussed above.

The tax rate on slot machines at Montreign Resort Casino will be 39% and the tax rate on table games will be 10%. The tax rate on VGM operations at Monticello Casino and Raceway will remain at the existing NYSGC commission rate and is expected to include an additional commission from NYSGC based on a rate related to the effective tax rate on all gross gaming revenue at the Gaming Facility developed by Montreign. Existing payments to the racing industry for purses and breeding will be maintained. The minimum gambling age for Montreign Resort Casino will be 21, and no smoking will be authorized.
The Gaming Act imposes a $500 annual fee on each slot machine and table game. In addition, the Gaming Act requires the maintenance of the horsemen and breeder payments at the 2013 dollar level to be adjusted annually pursuant to changes in the consumer price index.

Regulatory Permits and Approvals Relating to Adelaar

Town of Thompson

In January, 2013, the Town Board of the Town of Thompson, in which the EPT Property is located, unanimously approved certain zoning amendments necessary for the development of the Adelaar Project and the Comprehensive Development Plan for the entire project site. Moreover, in July 2013, the Planning Board granted final site plan approval for the Casino Project. On April 17, 2014, an application for a Minor Amendment to the Site Development Plan Approval for the Casino Project was made to the Planning Board. The Minor Site Plan Amendment included a minor design change, and an increase in the number of hotel rooms and additional parking for the Casino Project. By Resolution dated June 3, 2014, the Town Board determined that no further environmental review under the State Environmental Quality Review Act ("SEQRA") was required in connection with the proposed Minor Site Plan Amendment and issued a Negative Declaration of Environmental Significance. The Planning Board approved the Minor Site Plan Amendment by Resolution dated June 11, 2014. On August 13, 2014, the Planning Board adopted a resolution approving the Final Subdivision Plot for the Adelaar Project and the Casino Project parcels. On January 5, 2015, the New York State Department of Environmental Conservation issued a Freshwater Wetlands Permit, Stream Disturbance Permit and Water Quality Certification authorizing disturbances to certain state regulated wetlands and stream corridors necessary to facilitate the development. On January 6, 2015, the Town issued a local building department permit authorizing the removal of certain trees necessary to facilitate the development. On February 20, 2015, the U.S. Army Corps of Engineers issued a Wetlands Permit authorizing discharges to certain federally regulated wetlands on the EPT Property.

On June 3, 2015, the Company, as co-Applicant, submitted to the Planning Board an application for a minor amendment to the final site plan approval for the Casino Project reflecting certain changes to the Casino Project (the “Proposed Amendment”). By Resolution dated July 21, 2015, the Town Board determined that no further environmental review under SEQRA was required in connection with the Proposed Amendment and issued a Negative Declaration of Environmental Significance. The Planning Board approved the Proposed Amendment by Resolution dated July 22, 2015. Also on July 22, 2015, the Planning Board adopted a resolution granting Preliminary Site Plan Approval for the Golf Course. The Company anticipates submitting an application for Final Site Plan Approval for the Golf Course in the coming months. The Company further anticipates submitting an application for Final Site Plan Approval for the Entertainment Village upon finalization of design details and specific environmental impacts of the Entertainment Village will be reviewed concurrent with the application for Final Site Plan Approval.

County of Sullivan Industrial Development Agency

On March 19, 2013, the County of Sullivan Industrial Development Agency ("IDA") approved a Resolution (1) taking official action authorizing the issuance of revenue bonds to enable the Company to use the industrial development revenue bonds for the financing of the Casino Project; (2) appointing the Company as IDA's agent to undertake the Casino Project; and (3) describing the forms of financial assistance being contemplated by the IDA to include: (i) an exemption from New York State ("State") and local sales and use taxes with respect to certain items used in, or for the acquisition, construction and
equipping of, the Casino Project (the "Tax Benefit"), (ii) the grant of one or more mortgage liens on IDA's interest in the Casino Project to secure the bonds and/or any other indebtedness incurred by or for the benefit of the Company in connection with the Casino Project, which Mortgages would be exempt from all mortgage recording taxes imposed in the State and (iii) a partial (or full) real property tax abatement over sixteen (16) years. In connection with the IDA application, the benefit of the exemption from the mortgage recording taxes imposed in the State was estimated to be $1.1 million, and the partial (or full) real property tax abatement was estimated to be $126 million over sixteen (16) years. The benefit of the exemption from the mortgage recording taxes will be based upon the mortgage amount and the amount of the real property tax abatement will be based upon a formula that considers the assessed value determined by the Town. Fees for the utilization of the bonds and other financial assistance would be paid by the Company to the IDA. In September 2014, MRMI, Montreign, and the IDA entered into agreements providing certain financial benefits for the acquisition, construction and financing of the Casino Project consistent with the IDA’s Destination Resort Program policy. The IDA authorized the execution of these agreements pursuant to a resolution adopted on September 3, 2014. Consistent with the IDA resolution, the IDA, MRMI and Montreign executed an Agent Agreement, Lease Agreement, Leaseback Agreement, payment in lieu of tax ("PILOT") Agreement, and related documents, (together the "IDA Documents") which will become effective upon certain conditions, including the awarding of a Gaming Facility License to Montreign.

On May 26, 2015, the IDA took action to allow the Company to obtain the Tax Benefit with respect to its eligible Casino Project expenses immediately. In connection with this authorization, the Company paid to the IDA an administrative fee of $150,000 and was permitted to defer an escrow payment in the amount of $100,000 until a building permit for the construction of the Casino Project is issued.

On August 14, 2015, the Company applied to the IDA to increase the Tax Benefit as a result of the Proposed Changes. On September 18, 2015, the IDA adopted a Resolution approving (i) an increase in the Tax Benefit from approximately $15 million so that such benefit does not exceed $35 million; (ii) a proportionate increase in the annual rent to the IDA to $166,000; (iii) an increase in the Total Value Subject to PILOT from $53.5 million to $65 million; and (iv) a proportionate increase in the IDA transaction fee by $82,500, subject to the issuance of a Gaming Facility License. The Company and the IDA entered into and amended, as required, the IDA Documents consistent with the IDA Resolution as a result of the Proposed Changes.