Commitments and Contingencies
12 Months Ended
Dec. 31, 2013
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies
COMMITMENTS AND CONTINGENCIES
Commitments
Capital Spending and Development
We continually perform on-going refurbishment and maintenance at our facilities to maintain our standards of quality. Certain of these maintenance costs are capitalized, if such improvement or refurbishment extends the life of the related asset, while other maintenance costs that do not so qualify are expensed as incurred. The commitment of capital and the related timing thereof are contingent upon, among other things, negotiation of final agreements and receipt of approvals from the appropriate regulatory bodies. We must also comply with covenants and restrictions set forth in our debt agreements.

Kansas Management Contract
On January 14, 2011, the Kansas Management Contract was approved by the Kansas Racing and Gaming Commission ("KRGC"). The Kansas Management Contract contractually obligates the Kansas Star to open certain phases of the project by certain specified dates. With certain exceptions, the permanent gaming facility was required to be completed by January 14, 2013, which was met, and the entire construction project (as set forth in the contract) including the development of an event center that includes multiple venues for rodeos, concerts, and other events, an equestrian pavilion that includes a practice arena and covered stalls and 150 additional hotel rooms must be completed no later than January 14, 2015. In addition, as of January 14, 2015, Kansas Star is obligated to have made a minimum investment in infrastructure related to the Kansas Star development of $225.0 million, inclusive of any third party investments but exclusive of a $25.0 million privilege fee. We opened the permanent gaming facility on December 12, 2012 and project to date expenditures total more than $225.0 million as of December 31, 2013 which exceeds the minimum investment in infrastructure commitment. We currently expect to meet the remaining January 14, 2015 completion date with a total expected cost to complete, excluding amounts incurred and reflected in the consolidated balance sheets as of December 31, 2013 and amounts related to the 150 additional hotel rooms, of $21.5 million.

As part of the Kansas Management Contract, Kansas Star committed to donate $1.5 million each year to support education in the local area in which the Kansas Star operates for the duration of the Kansas Management Contract. We have made all distributions under this commitment as scheduled and such related expenses are recorded in Selling, general and administrative expenses on the consolidated statements of operations.

Mulvane Development Agreement
On March 7, 2011, Kansas Star entered into a Development Agreement with the City of Mulvane (“Mulvane Development Agreement”) related to the provision of water, sewer, and electrical utilities to the Kansas Star site. This agreement sets forth certain parameters governing the use of public financing for the provision of such utilities, through the issuance of general obligation bonds by the City of Mulvane, paid for through the imposition of a special tax assessment on the Kansas Star site payable over 15 years in an amount equal to the City’s full obligations under the general obligation bonds. 
 
During 2012, the City of Mulvane issued $19.7 million in general obligation bonds related to these infrastructure improvements.  In connection with the Merger, the Company's obligation under this agreement was revalued to fair value. Payments under the special tax assessment are secured by an irrevocable letters of credit of $5.6 million issued by the Company in favor of the City, which such amount will be reduced to $5.0 million in the first quarter of 2014 representing an amount equal to three times the annual special assessment tax imposed on Kansas Star.

During 2014, the City of Mulvane will perform additional infrastructure improvements that will benefit the Kansas Star site. In 2013, the City issued additional 14 years general obligation bonds to repay construction costs of the improvements. As of December 31, 2013, the Company has issued $0.6 million in letters of credit in favor of the City to secure payments made by the City related to these additional infrastructure improvements which will be reduced to zero upon completion of these additional improvements. Future obligations approximate less than $2.0 million per year through 2027.

Minimum Assessment Agreement
In 2007, Diamond Jo Dubuque entered a Minimum Assessment Agreement with the City of Dubuque. Under the Minimum Assessment Agreement, Diamond Jo Dubuque and the City agreed to a minimum taxable value related to the new casino of $57.9 million.  Diamond Jo Dubuque agreed to pay property taxes to the City based on the actual taxable value of the casino, but not less than the minimum taxable value.  Scheduled payments of principal and interest on the City Bonds will be funded through Diamond Jo Dubuque's payment obligations under the Minimum Assessment Agreement.  Diamond Jo Dubuque's is also obligated to pay any shortfall should property taxes be insufficient to fund the principal and interest payments on the City Bonds.

As a result of purchase accounting the Minimum Assessment Agreement obligation was revalued to fair value. Interest costs under the Minimum Assessment Agreement obligation are expensed as incurred. The remaining obligation under the Minimum Assessment Agreement at December 31, 2013 was $1.9 million, which was recorded in Accrued liabilities on the consolidated balance sheet and $14.9 million, net of a $3.1 million discount, which was recorded as a long-term obligation in Other liabilities on the consolidated balance sheet. The discount will be amortized to interest expense over the life of the Minimum Assessment Agreement. Total minimum payments by Diamond Jo Dubuque under the Minimum Assessment Agreement are approximately $1.9 million per year through 2036.

The Development Agreement also calls for (i) the payment by the Company for the reasonable and necessary actual operating costs incurred by the City for the operation, security, repair and maintenance of the public parking facility; and (ii) the payment by the Company to the City of $65 per parking space in the public parking facility per year, which funds will be deposited into a special sinking fund and used by the City for capital expenditures necessary to maintain the public parking facility. Operating costs of the parking facility incurred by DJL are expensed as incurred. Deposits to the sinking fund are recorded as other assets. When the sinking fund is used for capital improvements, such amounts are capitalized and amortized over their remaining useful life.
Merger Earnout
Under the terms of the Merger Agreement, Boyd Acquisition II, LLC (“HoldCo”), an indirect wholly-owned subsidiary of Boyd, is obligated to make an additional payment to Peninsula Gaming Partners, LLC in 2016 if Kansas Star's EBITDA, as defined in the Merger Agreement, for 2015 exceeds $105.0 million. The additional payment would be in an amount equal to 7.5 times the amount by which Kansas Star's 2015 EBITDA exceeds $105.0 million. The actual payout will be determined based on actual EBITDA of Kansas Star for calendar year 2015, and payments are not limited by a maximum value. If the actual 2015 EBITDA of Kansas Star is less than the target, the Company is not required to make any additional consideration payment. At December 31, 2013 and December 31, 2012, there were outstanding liabilities of $1.1 million and $9.8 million, respectively, related to the merger earnout which are included in other liabilities on the consolidated balance sheets.
 
Contingent Payments
In connection with Kansas Star’s acquisition of a land purchase option to purchase land upon which Kansas Star’s casino is currently being developed, Kansas Star is required to pay a former casino project developer and option holder 1% of Kansas Star’s EBITDA each month for a period of 10 years commencing December 20, 2011.

Borgata
Borgata Property Taxes
Borgata has filed tax appeal complaints, in connection with its property tax assessments for tax years 2009 through 2013, in New Jersey Tax Court (“Court”). The trial for tax years 2009 and 2010 was held during the second quarter of 2013 and a decision was issued on October 18, 2013. The assessor valued Borgata’s real property at approximately $2.3 billion. The Court found in favor of the Borgata and reduced the real property valuation to $880 million and $870 million for tax years 2009 and 2010, respectively. The City of Atlantic City filed an appeal in the New Jersey Superior Court - Appellate Division in November 2013. Borgata has paid its property tax obligations consistent with the assessor’s valuation and based on the Court’s decision, we estimate the 2009 and 2010 property tax refunds and related statutory interest will be approximately $48.0 million and $9.0 million, respectively. The trial for tax years 2011 through 2013 is scheduled to be held in June 2014 and we continue to pay our property tax obligations in accordance with the assessor’s valuation. We can provide no assurances that the Court’s decision will be upheld at the appellate level, nor can we be certain that we will receive a favorable decision in the 2011 through 2013 appeal. Due to the uncertainty surrounding the ultimate resolution of the City’s appeal, we will not record any gain until a final, non-appealable decision has been rendered. The final resolution of our appeals for the period January 1, 2009 through December 31, 2013 could result in adjustment to our estimated property tax liability at Borgata.

Utility Contract
In 2005, Borgata amended its executory contracts with a wholly-owned subsidiary of a local utility company, extending the end of the term to twenty years from the opening of The Water Club. The utility company provides Borgata with electricity and thermal energy (hot water and chilled water). Obligations under the thermal energy executory contract contain both fixed fees and variable fees based upon usage rates. The fixed fee components under the thermal energy executory contract are currently estimated at approximately $11.7 million per annum. Borgata also committed to purchase a certain portion of its electricity demand at essentially a fixed rate, which is estimated at approximately $1.7 million per annum. Electricity demand in excess of the commitment is subject to market rates based on Borgata's tariff class.
Investment Alternative Tax
The New Jersey Casino Control Act provides, among other things, for an assessment of licensees equal to 1.25% of their gross gaming revenues in lieu of an investment alternative tax equal to 2.5% of gross gaming revenues. Generally, Borgata may satisfy this investment obligation by investing in qualified eligible direct investments, by making qualified contributions or by depositing funds with the New Jersey Casino Reinvestment Development Authority (“CRDA”). Funds deposited with the CRDA may be used to purchase bonds designated by the CRDA or, under certain circumstances, may be donated to the CRDA in exchange for credits against future CRDA investment obligations. CRDA bonds have terms up to fifty years and bear interest at below market rates.
Borgata's CRDA obligations for the years ended December 31, 2013, 2012 and 2011 were $7.8 million, $7.7 million and $8.1 million, respectively, of which valuation provisions of $2.2 million, $4.4 million and $3.5 million, respectively, were recorded due to the respective underlying agreements.
Atlantic City Tourism District
As part of the State of New Jersey's plan to revitalize Atlantic City, a new law was enacted in February 2011 requiring that a tourism district (the “Tourism District”) be created and managed by the CRDA. The Tourism District has been established to include each of the Atlantic City casino properties along with certain other tourism related areas of Atlantic City. The law requires that a public-private partnership be created between the CRDA and a private entity that represents existing and future casino licensees. The private entity, known as The Atlantic City Alliance (the “ACA”), has been established in the form of a not-for-profit limited liability company, of which MDDC is a member. The public-private partnership between the ACA and CRDA shall be for an initial term of five years and its general purpose shall be to revitalize the Tourism District. The law requires that a $5 million contribution be made to this effort by all casinos prior to 2012 followed by an annual amount of $30 million to be contributed by the casinos commencing January 1, 2012 for a term of five years. Each casino's share of the annual contributions will equate to a percentage representing its gross gaming revenue for the prior calendar year compared to the aggregate gross gaming revenues for that period for all casinos. As a result, Borgata will expense their pro rata share of the $155 million as incurred. For the years ended December 31, 2013, 2012, and 2011, Borgata incurred expense of $6.5 million, $6.1 million and $0.9 million for the pro rata share of the initial contribution to the ACA.
Boyd Gaming Leases
The Orleans Hotel and Casino
The Orleans is situated on approximately 77 acres of leased land. The lease had an effective commencement date of October 1, 1995, an initial term of 50 years, and includes an option, exercisable by us, to extend the initial term for an additional 25 years. The lease provides for monthly rental payments of $0.3 million through February 2011 which such annual rental payments will thereafter increase by a compounding basis at a rate of 3.0% per annum. In addition, we have an option to purchase the real property during a two-year period commencing February 2016.

Suncoast Hotel and Casino
Suncoast is situated on approximately 49 acres of leased land. The lease had an effective commencement date of September 1, 1995, an initial term of 60 years, and contains three options to extend the term of the lease for ten years each. The original lease term expires in December 2055, exclusive of the three options to extend the term of the lease for 10 years each. The lease provides for monthly rental payments of approximately $0.2 million in 2004 that increase slightly each year. The landlord has the option to require us to purchase the property at the end of 2014 and each year end through 2018, at the fair market value of the real property at the time the landlord exercises the option, subject to certain pricing limitations. If we do not purchase the property if and when required, we would be in default under the lease agreement.

California Hotel and Casino
The California is situated on approximately 14 acres of owned land, and two acres of leased land, respectively. The leased land had an effective commencement date of September 1, 1973 with a term of 60 years. The lease provides for monthly rental payments of $3,000 through the June 30, 1973, and $6,500 from July 1, 1974 through August 31, 2003, with a cost-of-living index adjustment preceding the initial month of each of three-year periods from September 1, 2003 through August 31, 2027, and the initial month of each of the final two-year periods from September 1, 2027 through August 31, 2030, and the initial month of the final two-month remaining period. Monthly rent for the last 30 years of the lease will be negotiated and agreed upon, but shall be no less than $6,500 per month, or less than any rent computed for a prior month, whichever is more. In addition, we have the right of first refusal in the event the lessor shall receive from a third party a bona fide offer to purchase the premises.

Fremont Hotel and Casino
The Fremont is situated on approximately three acres of land, of which one acre is leased pursuant to six separate long-term ground lease agreements (collectively, the “Fremont Ground Leases”). The Fremont Ground Leases have lease terms ranging between 79 to 99 years. Five of the Fremont Ground Leases have expiration dates in either July or August 2053, and the sixth Fremont Ground Lease has an expiration date in December 2077. The lease expiring in December 2077 also contains a right of first refusal in the event that the lessor intends to sell that leased premises. None of the Fremont Ground Leases have option rights to further extend their lease terms. Each of the Fremont Ground Leases provide for monthly rental payments, with a cumulative current monthly rent of approximately $0.1 million. The monthly rental obligations of the Fremont Ground Leases are generally subject to periodic adjustment based on changes in the consumer price index (“CPI”). Principally, these CPI adjustments are done in either five or ten-year lease term cycles; however, one of the Fremont Ground Leases adjusts every two years of its lease term.

Sam's Town Hotel and Gambling Hall
Sam's Town Tunica is located on approximately 150 acres of owned real estate (the “Property”). However, the original sellers of the Property have an option to repurchase the Property in 2033 (the “Option Exercise Date”) for $0.9 million. The option will be deemed to be automatically exercised unless the original sellers notify the Company to the contrary at least 60 days prior to the Option Exercise Date.

Sam's Town Hotel and Casino
Sam's Town Shreveport is located on 18 acres of leased land and is a party to a Hotel Ground Lease with the City of Shreveport dated as of March 10, 1998, as amended, and an Amended and Restated Ground Lease dated as of March 10, 1998, as amended (together, the “Shreveport Ground Leases”). The initial terms of the Shreveport Ground Leases expired on April 30, 1999, but the Shreveport Ground Leases have been renewed and are still in effect. The Shreveport Ground Leases may be renewed for additional renewal terms which finally expire on March 10, 2048. Aggregate rent payable under the Shreveport Ground Leases is equal to (i) base rent of $0.53 million, as of December 31, 2012 plus (ii) percentage rent of 1% of the adjusted gross revenue from hotel and casino operations plus (iii) 4.75% of adjusted gross gaming revenue for admission taxes. Also, real estate taxes, insurance, utilities and other charges against the property are payable by the Company. Sam's Town Shreveport is also a party to a Commercial Lease with the State of Louisiana dated as of July 6, 1994, as amended by an amendment dated as of April 24, 2001 (together, the “Lease”). The initial term of the Lease expired in July 2004 but was renewed for an additional ten-year term and is still in effect. The Lease may be renewed for two additional ten-year renewal terms. The annual rent now payable under the Lease is $0.04 million.

Treasure Chest Casino
Treasure Chest is located on 14 acres of leased land and is a party to an Amended and Restated Lease for Parking and Other Amenities with the City of Kenner dated as of December 3, 1993, as amended (the “Lease”). The initial term of the Lease expired but the Lease has been renewed and is still in effect. The Lease may be renewed for additional renewal terms which finally expire on July 1, 2029. Rent payable under the Lease is the sum of (i) a base rent determined by formula plus (ii) a $2.50 per capita rent for each person entering the casino. For the years ended December 31, 2013, 2012 and 2011, rent paid to the City was $4.9 million, $5.1 million and $5.1 million. Treasure Chest is also a party to a Commercial Lease with the State of Louisiana dated as of March 9, 1994 (the “State Lease”). The initial term of the State Lease expired in March 2004 but was renewed for an additional ten-year term and is still in effect. The Lease may be renewed for two additional ten-year renewal terms. The annual rent now payable under the Lease is $0.1 million.

IP Casino Resort Spa
IP is located on 24 acres of owned land and leases approximately 4 acres of submerged tidelands from the state of Mississippi. The lease commenced on December 2005 and expires in 2035. The lease payment is adjusted annually at the end of each term based on the all urban consumer price index. The lease expense for the years ended December 31, 2013, 2012 and 2011 was $0.8 million, $0.8 million, $0.2 million. Additionally, IP leases a parking lot from the City of Biloxi on a monthly basis.

Diamond Jo Dubuque
DJL currently has approximately 500 surface parking spaces that are in close proximity to its casino located on properties that DJL leases under an operating lease for $500,000 annually through December 2018.   In accordance with an operating agreement between DJL and the Dubuque Racing Association, Ltd. (“DRA”), the DRA reimburses DJL for these lease payments.

Diamond Jo Worth
DJW leases, under an operating lease, 10 acres of land north of the casino that is used for patron parking. This lease requires DJW to pay less than $0.1 million per year as rent through June 2016.  The property lease also allows for the purchase of the leased land at the expiration of the lease for a total purchase price of approximately $0.8 million. In addition, DJW also leases, under an operating lease, 30 acres of land through August 2016 for use as additional hunting land at its Pheasant Links facility in Emmons, Minnesota. Total rent expense for these leases are less than $0.1 million annually.

Evangeline Downs
The Company leases three of its OTB facilities and other equipment under noncancelable operating leases. The leases expire on various dates through 2040. The Company also leases certain gaming machines and other equipment under cancelable leases. These cancelable leases require either fixed monthly payments or contingent monthly rental payments based on usage of the equipment.
Borgata Leases
As of December 31, 2010, MDDC owns approximately 26 acres of land and all improvements thereon with respect to that portion of the property consisting of the Borgata Hotel. In addition, MDDC, as lessee, entered into a series of ground leases with MGM, as lessor, for a total of approximately 20 acres of land underlying the employee parking garage, public space expansion, rooms expansion, and modified surface parking lot reside, as well as, an undeveloped parcel. On November 4, 2010, MGM announced that it had closed the sale of land leased to MDDC for the public space expansion, rooms expansion, parking structure and the undeveloped parcel. Other than MDDC's obligation to pay rent (in an amount equal to the amount paid under the parking structure ground lease) and property taxes pursuant to the alternative parking structure ground lease, Borgata's obligations under the ground leases were not modified by the sale. The leases consist of:
Lease and Option Agreement, dated as of January 16, 2002, as amended by a letter agreement, dated April 10, 2009, a letter agreement, dated September 21, 2009, the Modification of Lease and Option Agreement, dated as of August 20, 2004, and the Second Modification of Employee Parking Structure Lease and Option Agreement, dated March 23, 2010, for approximately 2 acres of land underlying the parking garage;
Expansion Ground Lease, dated as of January 1, 2005, as amended by the Modification of Expansion Ground Lease, dated March 23, 2010, for approximately 4 acres of land underlying the Public Space Expansion;
Tower Expansion & Additional Structured Parking Ground Lease Agreement, dated as of January 1, 2005, as amended by the Modification of Tower Expansion & Additional Structured Parking Ground Lease Agreement, dated February 20, 2010, and the Second Modification of Tower Expansion & Additional Structured Parking Ground Lease Agreement, dated March 23, 2010, for approximately 2 acres of land underlying the Rooms Expansion and 3 acres of land underlying a parking structure each;
Surface Lot Ground Lease, dated as of August 20, 2004, as amended by the Modification of Surface Lot Ground Lease, dated March 23, 2010, for approximately 8 acres of land consisting of the surface parking lot; and
Ground Lease Agreement, dated as of March 23, 2010, for approximately 1 acre of an undeveloped land parcel.
Pursuant to the alternative parking structure ground lease, (i) commencing on the date of the Divestiture Trust's agreement to sell the land underlying the ground leases, MDDC became responsible for all real property taxes assessed against the land underlying the alternative parking structure ground lease and (ii) payment of monthly rent under the alternative parking structure ground lease was deferred until 18 months following the execution of the sale agreement in an amount consistent with the rent due under the parking structure ground lease on a per square foot basis.
The lease terms extend until December 31, 2070 with the exception of the surface parking lot lease. The surface parking lot ground lease is on a month-to-month term and may be terminated by either party effective on the last day of the month that is three months after notice is given. In addition, the surface parking lot ground lease will terminate on any termination of the Divestiture Trust, unless the New Jersey Casino Control Commission ("NJCCC") approves an extended term of such lease.
MDDC owns all improvements made on the leased lands during the term of each ground lease. Upon expiration of such term, ownership of such improvements reverts back to the landlord.
If during the term of the rooms expansion ground lease, the public space expansion ground lease or the alternate parking structure ground lease, the third party landlord ("Landlord") or any person associated with the Landlord is found by the NJCCC to be unsuitable to be associated with a casino enterprise and such person is not removed from such association in a manner acceptable to the NJCCC, then MDDC may, upon written notice to the Landlord, elect to purchase the leased land for the appraised value as determined under the terms of such ground leases, unless the Landlord elects, upon receipt of such notice, to sell the land to a third party, subject to the ground leases. If the Landlord elects to sell the land to a third party but is unable to do so within one year, then the Landlord must sell the land to MDDC for the appraised value.
In addition, MDDC has an option to purchase the land leased under the parking structure ground lease at any time during the term of that lease so long as it is not in default thereunder, at fair market value as determined in accordance with the terms of parking structure ground lease. In the event that the land underlying the surface parking lot ground lease is sold to a third party, MDDC has the option to build a parking garage, if necessary, to replace the lost parking spaces on the land underlying the alternate parking structure ground lease.
Future Minimum Lease Payments and Rental Income
Future minimum lease payments required under noncancelable operating leases, which are primarily related to land leases, as of December 31, 2013 are as follows:
(In thousands)
Boyd Gaming Lease Obligations
 
Borgata Lease Obligations
 
Total Lease Obligations
For the Year Ending December 31,
 
 
 
 
 
2014
$
13,263

 
$
7,586

 
$
20,849

2015
12,577

 
6,881

 
19,458

2016
12,459

 
6,606

 
19,065

2017
12,280

 
6,382

 
18,662

2018
11,301

 
6,382

 
17,683

Thereafter
408,276

 
317,549

 
725,825

 
$
470,156

 
$
351,386

 
$
821,542


Rent expense for the years ended December 31, 2013, 2012 and 2011 was $38.6 million, $29.3 million, and $28.4 million, and is included in selling, general and administrative expenses on the accompanying consolidated statements of operations.
Future minimum rental income, which is primarily related to retail and restaurant facilities located within our properties, as of December 31, 2013 are as follows:
(In thousands)
Boyd Gaming Rental Income
 
Borgata Rental Income
 
Total Rental Income
For the Year Ending December 31,
 
2014
$
881

 
$
1,706

 
$
2,587

2015
751

 
1,706

 
2,457

2016
603

 
1,413

 
2,016

2017
515

 
1,342

 
1,857

2018
370

 
1,342

 
1,712

Thereafter
319

 
6,327

 
6,646

 
$
3,439

 
$
13,836

 
$
17,275



Contingencies
Legal Matters
We are parties to various legal proceedings arising in the ordinary course of business. We believe that all pending claims, if adversely decided, would not have a material adverse effect on our business, financial position or results of operations.