Note 8 — Utility Regulatory Assets and Liabilities and Regulatory Matters
The following regulatory assets and liabilities associated with UGI Utilities are included in our Consolidated Balance Sheets at September 30:
 
2017
 
2016
Regulatory assets:
 
 
 
Income taxes recoverable
$
121.4

 
$
115.7

Underfunded pension and postretirement plans
141.3

 
183.1

Environmental costs
61.6

 
59.4

Deferred fuel and power costs
7.7

 
0.2

Removal costs, net
31.0

 
27.9

Other
5.9

 
8.8

Total regulatory assets
$
368.9

 
$
395.1

Regulatory liabilities (a):
 
 
 
Postretirement benefit overcollections
$
17.5

 
$
17.5

Deferred fuel and power refunds
10.6

 
22.3

State income tax benefits — distribution system repairs
18.4

 
15.1

Other
2.7

 
0.7

Total regulatory liabilities
$
49.2

 
$
55.6


(a)
Regulatory liabilities are recorded in “Other current liabilities” and “Other noncurrent liabilities” on the Consolidated Balance Sheets.

Other than removal costs, UGI Utilities currently does not recover a rate of return on the regulatory assets included in the table above.

Income taxes recoverable. This regulatory asset is the result of recording deferred tax liabilities pertaining to temporary tax differences principally as a result of the pass through to ratepayers of the tax benefit on accelerated tax depreciation for state income tax purposes, and the flow through of accelerated tax depreciation for federal income tax purposes for certain years prior to 1981. These deferred taxes have been reduced by deferred tax assets pertaining to utility deferred investment tax credits. UGI Utilities has recorded regulatory income tax assets related to these deferred tax liabilities representing future revenues recoverable through the ratemaking process over the average remaining depreciable lives of the associated property ranging from 1 to approximately 65 years.
Underfunded pension and other postretirement plans. This regulatory asset represents the portion of net actuarial losses and prior service costs (credits) associated with pension and other postretirement benefits which are probable of being recovered through future rates based upon established regulatory practices. These regulatory assets are adjusted annually or more frequently under certain circumstances when the funded status of the plans is recorded in accordance with GAAP. These costs are amortized over the average remaining future service lives of plan participants.
Environmental costs. Environmental costs principally represent estimated probable future environmental remediation and investigation costs that UGI Gas, CPG and PNG expect to incur, primarily at MGP sites in Pennsylvania, in conjunction with remediation consent orders and agreements with the Pennsylvania Department of Environmental Protection (“DEP”). Pursuant to base rate orders, UGI Gas, PNG and CPG receive ratemaking recognition of estimated environmental investigation and remediation costs associated with their environmental sites. This ratemaking recognition balances the accumulated difference between historical costs and rate recoveries with an estimate of future costs associated with the sites. At September 30, 2017, the period over which UGI Gas, PNG and CPG expect to recover these costs will depend upon future remediation activity. For additional information on environmental costs, see Note 15.
Removal costs, net. This regulatory asset represents costs incurred, net of salvage, associated with the retirement of depreciable utility plant. As required by PUC ratemaking, removal costs include actual costs incurred associated with asset retirement obligations. Consistent with prior ratemaking treatment, UGI Utilities expects to recover these costs over five years.
Postretirement benefit overcollections. This regulatory liability represents the difference between amounts recovered through rates by UGI Gas and Electric Utility and actual costs incurred in accordance with accounting for postretirement benefits. With respect to UGI Gas, postretirement benefit overcollections are generally being refunded to customers over a ten-year period beginning October 19, 2016, the date UGI Gas’ Joint Petition pursuant to its January 19, 2016 base rate filing became effective (see “Base Rate Filings” below). With respect to Electric Utility, the excess of the amounts recovered through rates and the actual costs incurred in accordance with accounting for postretirement benefits is being deferred for future rate refund to customers.
Deferred fuel and power refunds. Gas Utility’s and Electric Utility’s tariffs contain clauses that permit recovery of all prudently incurred purchased gas and power costs through the application of purchased gas cost (“PGC”) rates in the case of Gas Utility and default service (“DS”) tariffs in the case of Electric Utility. The clauses provide for periodic adjustments to PGC and DS rates for differences between the total amount of purchased gas and electric generation supply costs collected from customers and recoverable costs incurred. Net undercollected costs are classified as a regulatory asset and net overcollections are classified as a regulatory liability.
Gas Utility uses derivative instruments to reduce volatility in the cost of gas it purchases for firm- residential, commercial and industrial (“retail core-market”) customers. Realized and unrealized gains or losses on natural gas derivative instruments are included in deferred fuel costs or refunds. Net unrealized gains on such contracts at September 30, 2017 and 2016 were $0.1 and $4.3, respectively.
In order to reduce volatility associated with a substantial portion of its electric transmission congestion costs, Electric Utility obtains financial transmission rights (“FTRs”). FTRs are derivative instruments that entitle the holder to receive compensation for electricity transmission congestion charges when there is insufficient electricity transmission capacity on the electric transmission grid. Because Electric Utility is entitled to fully recover its DS costs, realized and unrealized gains or losses on FTRs are included in deferred fuel and power costs or deferred fuel and power refunds. Unrealized gains or losses on FTRs at September 30, 2017 and 2016, were not material.
State income tax benefits — distribution system repairs. This regulatory liability represents Pennsylvania state income tax benefits, net of federal benefit, resulting from the deduction for income tax purposes of repair and maintenance costs associated with Gas Utility or Electric Utility assets which are capitalized for regulatory and GAAP reporting. The tax benefits associated with these repair and maintenance deductions will be reflected as a reduction to income tax expense over the remaining tax lives of the related book assets.
Other. Other regulatory assets and liabilities comprise a number of deferred items including, among others, a portion of preliminary stage information technology costs, energy efficiency conservation costs and rate case expenses.
Other Regulatory Matters

Base Rate Filings. On January 19, 2017, PNG filed a rate request with the PUC to increase PNG’s annual base operating revenues for residential, commercial and industrial customers by $21.7 annually. The increased revenues would fund ongoing system improvements and operations necessary to maintain safe and reliable natural gas service. On June 30, 2017, all active parties supported the filing of a Joint Petition for Approval of Settlement of all issues with the PUC providing for an $11.3 PNG annual base distribution rate increase. On August 31, 2017, the PUC approved the Joint Petition and the increase became effective October 20, 2017.

On January 19, 2016, UGI Utilities filed a rate request with the PUC to increase UGI Gas’s annual base operating revenues for residential, commercial and industrial customers by $58.6. The increased revenues would fund ongoing system improvements and operations necessary to maintain safe and reliable natural gas service. On June 30, 2016, a Joint Petition for Approval of Settlement of all issues providing for a $27.0 UGI Gas annual base distribution rate increase, to be effective October 19, 2016, was filed with the PUC (“Joint Petition”). On October 14, 2016, the PUC approved the Joint Petition with a minor modification which had no effect on the $27.0 base distribution rate increase. The increase became effective on October 19, 2016.

Distribution System Improvement Charge. On April 14, 2012, legislation became effective enabling gas and electric utilities in Pennsylvania, under certain circumstances, to recover the cost of eligible capital investment in distribution system infrastructure improvement projects between base rate cases. The charge enabled by the legislation is known as a distribution system improvement charge (“DSIC”). The primary benefit to a company from a DSIC charge is the elimination of regulatory lag, or delayed rate recognition, that occurs under traditional ratemaking relating to qualifying capital expenditures. To be eligible for a DSIC, a utility must have filed a general rate filing within five years of its petition seeking permission to include a DSIC in its tariff, and not exceed certain earnings tests. Absent PUC permission, the DSIC is capped at 5% of distribution charges billed to customers.

PNG and CPG received PUC approval on a DSIC tariff, initially set at zero, in 2014. PNG and CPG began charging a DSIC at a rate other than zero beginning on April 1, 2015 and April 1, 2016, respectively. In March 2016, PNG and CPG filed petitions, seeking approval to increase the maximum allowable DSIC from 5% to 10% of billed distribution revenues. On May 10, 2017, the PUC issued a final Order to approve an increase of the maximum allowable DSIC to 7.5% of billed distribution revenues effective July 1, 2017, for PNG and CPG, pending reconsideration at each company’s Long-term Infrastructure Improvement Plan filing in 2018.

On November 9, 2016, UGI Gas received PUC approval to establish a DSIC tariff mechanism, capped at 5% of distribution charges billed to customers, effective January 1, 2017. UGI Gas will be permitted to recover revenue under the mechanism for the amount of DSIC-eligible plant placed into service in excess of the threshold amount of DSIC-eligible plant agreed upon in the settlement of its recent base rate case.

Preliminary Stage Information Technology Costs. During Fiscal 2016, we determined that certain preliminary project stage costs associated with an ongoing information technology project at UGI Utilities were probable of future recovery in rates in accordance with GAAP related to regulated entities. As a result, during Fiscal 2016, we capitalized $5.8 of such project costs ($5.4 of which had been expensed prior to Fiscal 2016) and recorded associated increases to utility property, plant and equipment ($2.7) and regulatory assets ($3.1). Subsequent to this determination, we continue to capitalize such preliminary stage project costs in accordance with GAAP related to regulated entities.