Property, Plant and Equipment, Net
12 Months Ended
Dec. 31, 2016
Property, Plant and Equipment [Abstract]  
Property, Plant and Equipment, Net
Property, Plant and Equipment—Net
Property, plant and equipment—net consisted of the following:
 
December 31,
 
2016
 
2015
 
(in millions)
Land
$
1.4

 
$
1.6

Buildings and improvements
16.7

 
14.5

Machinery and equipment
562.3

 
537.5

Construction in progress
21.9

 
18.9

Property, plant and equipment
602.3

 
572.5

Less: Accumulated depreciation and amortization
301.0

 
265.5

Property, plant and equipment—net
$
301.3

 
$
307.0


Additions to property, plant and equipment included in our consolidated statements of cash flows represents cash outflows for capital expenditures; therefore, it does not include the net increase (decrease) in amounts accrued for capital expenditures, which were $1.8 million, $(2.2) million and $1.3 million for the years ended December 31, 2016, 2015 and 2014.
Losses on the disposal of certain machinery and equipment were $0.1 million, $2.0 million and zero for the years ended December 31, 2016, 2015 and 2014, respectively, and are included in other general and administrative expenses on our consolidated statements of operations.
Plant turnarounds—Scheduled inspections, replacements and overhauls of machinery and equipment at our continuous process manufacturing facility are referred to as plant turnarounds. The expenditures related to turnarounds are capitalized in property, plant and equipment when incurred. The following is a summary of capitalized plant turnaround costs:
 
Year ended December 31,
 
2016
 
2015
 
2014
 
(in millions)
Net capitalized turnaround costs:
 

 
 

 
 
Beginning balance
$
37.8

 
$
16.7

 
$
22.7

Additions
4.9

 
33.6

 
0.3

Depreciation
(16.1
)
 
(12.5
)
 
(6.3
)
Ending balance
$
26.6

 
$
37.8

 
$
16.7


Scheduled replacements and overhauls of plant and equipment include the dismantling, repair or replacement and installation of various components including piping, valves, motors, turbines, pumps, compressors, heat exchangers and the replacement of catalyst when a full plant shutdown occurs. Scheduled inspections are also conducted during full plant shutdowns, including required safety inspections which entail the disassembly of various components such as steam boilers, pressure vessels and other equipment requiring safety certifications. Internal employee costs and overhead are not considered turnaround costs and are not capitalized.