TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

This management discussion and analysis ("MD&A") is intended to help the reader understand Taseko Mines Limited (“Taseko”, “we”, “our” or the “Company”), our operations, financial performance, and current and future business environment. This MD&A is intended to supplement and complement the consolidated financial statements and notes thereto, prepared in accordance with IAS 34 of International Financial Reporting Standards (“IFRS”) for the three and nine months ended September 30, 2017 (the “Financial Statements”). You are encouraged to review the Financial Statements in conjunction with your review of this MD&A and the Company’s other public filings, which are available on the Canadian Securities Administrators’ website at www.sedar.com and on the EDGAR section of the United States Securities and Exchange Commission’s (“SEC”) website at www.sec.gov.

This MD&A is prepared as of October 26, 2017. All dollar figures stated herein are expressed in Canadian dollars, unless otherwise specified.

Cautionary Statement on Forward-Looking Information

This discussion includes certain statements that may be deemed "forward-looking statements". All statements in this discussion, other than statements of historical facts, that address future production, reserve potential, exploration drilling, exploitation activities, and events or developments that the Company expects are forward-looking statements. Although we believe the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration successes, continued availability of capital and financing and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. All of the forward-looking statements made in this MD&A are qualified by these cautionary statements. We disclaim any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except to the extent required by applicable law. Further information concerning risks and uncertainties associated with these forward-looking statements and our business may be found in the Company’s other public filings with the SEC and Canadian provincial securities regulatory authorities.

1



TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

CONTENTS

OVERVIEW 3
   
HIGHLIGHTS 3
   
REVIEW OF OPERATIONS 5
   
GIBRALTAR OUTLOOK 6
   
REVIEW OF PROJECTS  7
   
MARKET REVIEW 8
   
FINANCIAL PERFORMANCE 8
   
FINANCIAL CONDITION REVIEW 13
   
SUMMARY OF QUARTERLY RESULTS 17
   
CRITICAL ACCOUNTING POLICIES AND ESTIMATES 18
   
INTERNAL CONTROLS OVER FINANCIAL REPORTING AND DISCLOSURE CONTROLS AND PROCEDURES 18
   
RELATED PARTY TRANSACTIONS 19
   
NON-GAAP PERFORMANCE MEASURES 21

2



TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

OVERVIEW

Taseko Mines Limited (“Taseko” or “Company”) is a mining company that seeks to create shareholder value by acquiring, developing, and operating large tonnage mineral deposits which, under conservative forward metal price assumptions, are capable of supporting a mine for ten years or longer. The Company’s sole operating asset is the 75% owned Gibraltar Mine, a large copper mine located in central British Columbia. The Gibraltar Mine is one of the largest copper mines in North America. Taseko also owns the Florence copper, Aley niobium, Harmony gold and New Prosperity gold-copper projects.

HIGHLIGHTS

    Three months ended     Nine months ended  
Financial Data   September 30,     September 30,  
(Cdn$ in thousands, except for per share amounts)   2017     2016     Change     2017     2016     Change  
Revenues   78,508     55,964     22,544     282,891     169,237     113,654  
Earnings from mining operations before depletion and amortization*   45,133     11,566     33,567     145,020     8,098     136,922  
Earnings (loss) from mining operations   33,348     (4,501 )   37,849     111,859     (35,617 )   147,476  
Net income (loss)   20,136     (15,610 )   35,746     41,862     (36,509 )   78,371  
   Per share - basic (“EPS”)   0.09     (0.07 )   0.16     0.19     (0.16 )   0.35  
Adjusted net income (loss)*   13,405     (10,423 )   23,828     42,965     (48,264 )   91,229  
   Per share - basic (“adjusted EPS”)*   0.06     (0.05 )   0.11     0.19     (0.22 )   0.41  
EBITDA*   48,457     4,064     44,393     141,407     7,208     134,199  
Adjusted EBITDA*   42,356     9,285     33,071     133,110     (2,849 )   135,959  
Cash flows provided by (used for) operations   37,124     (7,493 )   44,617     179,180     (15,810 )   194,990  
                                     

    Three months ended     Nine months ended  
Operating Data (Gibraltar - 100% basis)   September 30,     September 30,  
    2017     2016     Change     2017     2016     Change  
Tons mined (millions)   23.3     21.5     1.8     66.2     69.2     (3.0 )
Tons milled (millions)   7.2     7.4     (0.2 )   22.0     22.1     (0.1 )
Production (million pounds Cu)   35.1     33.1     2.0     115.7     92.6     23.1  
Sales (million pounds Cu)   30.2     29.8     0.4     111.7     90.6     21.1  

*Non-GAAP performance measure. See page 21 of this MD&A.

3



TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

HIGHLIGHTS - CONTINUED

Third Quarter Highlights

  • Earnings from mining operations before depletion and amortization* were $45.1 million;

  • Cash flow from operations was $37.1 million for the third quarter;

  • Adjusted net income* for the third quarter was $13.4 million (or $0.06 per share) and net income was $20.1 million (or $0.09 per share);

  • Site operating costs, net of by-product credits* were US$0.88 per pound produced, down 44% from the third quarter of 2016;

  • The Gibraltar Mine produced 35.1 million pounds of copper and 0.4 million pounds of molybdenum (100% basis) at a total operating cost (C1)* of US$1.18 per pound;

  • Total sales for the third quarter were 30.2 million pounds of copper and 0.4 million pounds of molybdenum;

  • In July 2017, Gibraltar’s mining and milling operations were impacted by wildfires in the Cariboo region which limited our employees’ ability to travel to the mine site. A temporary shutdown of rail service also affected our ability to get product to the port, and as a result sales volumes were lower than planned;

  • On September 25, 2017, the Company announced that the Environmental Appeals Board of the U.S. Environmental Protection Agency (“EPA”) had issued an order denying any further review of the Underground Injection Control (“UIC”) Permit granted in 2016 for Taseko’s Florence Copper Project. All necessary state and federal permits are now in place to build and operate the Production Test Facility (“PTF”), and the Company’s board of directors has approved the construction of the PTF at an estimated cost of US$25 million; and

  • The Company’s cash balance at September 30, 2017 was $96 million.

*Non-GAAP performance measure. See page 21 of this MD&A.

4



TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

REVIEW OF OPERATIONS

Gibraltar Mine (75% Owned)                              
Operating data (100% basis)   Q3 2017     Q2 2017     Q1 2017     Q4 2016     Q3 2016  
Tons mined (millions)   23.3     21.1     21.8     18.5     21.5  
Tons milled (millions)   7.2     7.5     7.3     7.3     7.4  
Strip ratio   4.1     2.8     2.4     1.1     1.0  
Site operating cost per ton milled (CAD$)* $ 5.93   $ 7.67   $ 8.59   $ 9.13   $ 9.47  
Copper concentrate                              
   Grade (%)   0.284     0.309     0.328     0.319     0.259  
   Recovery (%)   86.1     85.2     85.9     87.0     85.9  
   Production (million pounds Cu)   35.1     39.4     41.3     40.7     33.1  
   Sales (million pounds Cu)   30.2     40.7     40.8     40.4     29.8  
   Inventory (million pounds Cu)   9.3     4.6     5.9     5.6     5.4  
Molybdenum concentrate                              
   Production (thousand pounds Mo)   445     789     866     764     185  
   Sales (thousand pounds Mo)   403     794     859     798     105  
Per unit data (US$ per pound produced)*                              
   Site operating costs* $ 0.97   $ 1.08   $ 1.15   $ 1.23   $ 1.64  
   By-product credits*   (0.09 )   (0.11 )   (0.15 )   (0.11 )   (0.06 )
Site operating costs, net of by-product credits*   0.88   $ 0.97   $ 1.00   $ 1.12   $ 1.58  
Off-property costs   0.30     0.34     0.33     0.36     0.31  
Total operating costs (C1)* $ 1.18   $ 1.31   $ 1.33   $ 1.48   $ 1.89  

*Non-GAAP performance measure. See page 21 of this MD&A.

5



TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

OPERATIONS ANALYSIS

Third quarter results

Copper head grade at Gibraltar was 0.284% in the third quarter and copper recovery for the quarter was 86%. Mill throughput was 7.2 million tons of ore and the mine produced 35.1 million pounds of copper.

A total of 23.3 million tons were mined during the quarter at a strip ratio of 4.1 to 1. Waste stripping costs of $22.9 million (75% basis) were capitalized in the quarter primarily related to a new pushback in the Granite pit.

Mining and milling operations in July were impacted by wildfires in the Cariboo region which limited our employees’ ability to travel to the mine site, due to restrictions on road access and evacuation orders in the region. This resulted in reduced production for periods of time as well as a complete mine shutdown for several days during July. Mill operations returned to normal in early August. During the quarter, approximately 2.6 million tons of ore were drawn from the ore stockpile, which was largely due to the wild fires impact on mine site access and the lack of employees available for mine operations.

Site operating cost per ton milled* was $5.93 in the third quarter of 2017, which is lower than recent quarters due to the increased capitalization of stripping costs and the drawdown of ore stockpiles.

The molybdenum circuit was negatively impacted by a lack of personnel during the wild fires. A total of 0.4 million pounds of molybdenum were produced. By-product credits per pound produced* was US$0.09 in the third quarter of 2017. Site operating costs per pound produced, net of by-product credits* decreased to US$0.88 in the third quarter of 2017 from US$0.97 in the second quarter of 2017.

Off-property costs per pound produced* were US$0.30 for the third quarter of 2017 compared to the prior quarter off-property costs of US$0.34. The decrease is due to lower than planned sales volumes, as treatment and refining and ocean freight costs are recognized at the time of sale.

Total operating costs (C1) per pound* decreased to US$1.18, a 10% reduction from the second quarter of 2017.

GIBRALTAR OUTLOOK

Overall, Gibraltar has maintained a stable level of operations and management continues to focus on further improvements to operating practices to reduce unit costs. Copper prices have continued to strengthen in the fourth quarter of 2017, increasing to US$3.16 per pound as of October 26, 2017, which is US$0.28 higher than the average LME copper price in the third quarter of 2017. Operating margins at Gibraltar are sensitive to the Canadian dollar as approximately 80% of mine operating costs are paid in Canadian dollars.

The Company is pursuing a potential insurance claim related to the Cariboo region wildfires in July, however, the outcome of the claim cannot be determined at this time

*Non-GAAP performance measure. See page 21 of this MD&A.

6



TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

REVIEW OF PROJECTS

Taseko’s strategy has been to grow the Company by leveraging cash flow from the Gibraltar Mine to assemble and develop a pipeline of projects. We continue to believe this will generate the best, long-term returns for shareholders. Our development projects are located in British Columbia and Arizona and represent a diverse range of metals, including gold, copper, molybdenum and niobium. During the third quarter of 2017, expenditures of $1.8 million were incurred on the Florence Copper project, and total expenditures of $1.0 million were incurred on the Aley and New Prosperity projects. Taseko will continue to take a prudent approach to spending on development projects.

Florence Copper

On September 25, 2017, the Company announced that the Environmental Appeals Board (“EAB”) of the Environmental Protection Agency had issued an order denying any further review of the Underground Injection Control Permit granted in 2016 for Taseko’s Florence Copper Project. In the September 22, 2017 decision, the EAB found that the petitioners failed to demonstrate that any errors were made in issuing the federal permit. The Company now has all necessary state and federal permits in place to build and operate the Production Test Facility (“PTF”).

The Company is moving forward with the construction of the PTF at an estimated cost of US$25 million. The PTF will include a well field comprised of thirteen (four injection and nine recovery) commercial scale production wells and numerous monitoring, observation and point of compliance wells, and also an integrated SX/EW plant. With major components already on site, the PTF is expected to be operational in the latter half of 2018.

In January 2017, the Company announced that completed technical work on the Florence property has resulted in a significant improvement in project economics. On February 28, 2017, the NI 43-101 technical report documenting these results was filed on www.sedar.com.

New Prosperity

On July 18, 2017, Taseko received approval from the Province of British Columbia to undertake a site investigation program to conduct exploratory work at the New Prosperity project site. The Province issued a Notice of Work, which is a multi-year permit from the Ministry of Energy & Mines that allows the Company to gather information for the purpose of advancing mine permitting under the British Columbia Mines Act.

Taseko is proceeding with its request to amend the British Columbia environmental assessment certificate for the New Prosperity Project.

The two Judicial Reviews initiated by Taseko were heard in federal court over a five day period in the week of January 30, 2017. Both Judicial Reviews focus on the principles of administrative and procedural fairness. Taseko’s allegation is that the Government of Canada, through the conduct of the environmental assessment and the decisions which resulted from it, failed in their obligation to uphold those fundamental principles.

7



TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

MARKET REVIEW

Prices (USD per pound for Commodities)

Global economic uncertainty has led to significant copper price volatility over short periods of time. The U.S. trade policies, Chinese economic demand, copper supply disruptions, and interest rate expectations have all contributed to the recent price volatility.

The average price of London Metals Exchange (“LME”) copper was US$2.88 per pound in the third quarter of 2017, which was 12% higher than the second quarter of 2017 and about 33% higher than the third quarter of 2016. Management believes that the market will continue to benefit from improving global copper demand and tight mine supply going forward.

The Company’s agreement for the sale of molybdenum concentrate specifies molybdenum pricing based on the published Platts metals reports. The average published molybdenum price was US$8.13 per pound in the third quarter of 2017, which was slightly higher than the second quarter of 2017.

Approximately 80% of the Gibraltar Mine's costs are Canadian dollar denominated and therefore, fluctuations in the Canadian/US dollar exchange rate can have a significant effect on the Company’s operating results and unit production costs, which are reported in US dollars. The Canadian dollar strengthened by approximately 7% during the third quarter of 2017.

FINANCIAL PERFORMANCE

Earnings

The Company’s net income was $20.1 million ($0.09 income per share) for the three months ended September 30, 2017, compared to a net loss of $15.6 million ($0.07 loss per share) for the same period in 2016. The increase in net income was primarily due to higher copper prices, higher production and sales volumes, lower production costs, as well as unrealized foreign exchange gains on the Company’s US dollar denominated debt.

The Company realized net income of $41.9 million ($0.19 income per share) for the nine months ended September 30, 2017, compared to a net loss of $36.5 million ($0.16 loss per share) for the same period in 2016. The increase in net income was primarily due to higher copper prices, higher production and sales volumes, and lower production costs at the Gibraltar Mine.

8



TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

Earnings from mining operations before depletion and amortization* was $45.1 million and $145.0 million, respectively, for the three and nine months ended September 30, 2017, compared to earnings of $11.6 million and $8.1 million, respectively, for the same prior periods in 2016. The increase in earnings from mining operations was a result of higher copper and molybdenum revenues and lower production costs.

Included in net income (loss) are a number of items that management believes require adjustment in order to better measure the underlying performance of the business. The following items have been adjusted as management believes they are not indicative of a realized economic gain/loss or the underlying performance of the business in the period:

    Three months ended     Nine months ended  
    September 30,     September 30,  
(Cdn$ in thousands)   2017     2016     Change     2017     2016     Change  
Net earnings (loss)   20,136     (15,610 )   35,746     41,862     (36,509 )   78,371  
   Unrealized foreign exchange (gain) loss   (10,299 )   5,090     (15,389 )   (19,225 )   (16,587 )   (2,638 )
   Write-down of mine equipment   3,551     -     3,551     3,551     -     3,551  
   Unrealized loss on copper put options   647     567     80     1,072     567     505  
   Loss on settlement of long-term debt   -     -     -     13,102     -     13,102  
   (Gain) loss on copper call option   -     (517 )   517     6,305     474     5,831  
   Other non-recurring expenses   -     81     (81 )   -     5,489     (5,489 )
   Estimated tax effect of adjustments   (630 )   (34 )   (596 )   (3,702 )   (1,698 )   (2,004 )
Adjusted net income (loss) *   13,405     (10,423 )   23,828     42,965     (48,264 )   91,229  

*Non-GAAP performance measure. See page 21 of this MD&A.

In the three and nine months ended September 30, 2017, the Canadian dollar strengthened in comparison to the prior period ends resulting in unrealized foreign exchange gains of $10.3 million and $19.2 million, respectively. The unrealized foreign exchange gains were primarily driven by the translation of the Company’s US dollar denominated debt.

A write-down of mine equipment of $3.6 million was recorded in the third quarter to adjust the carrying value of certain Gibraltar mine equipment to its estimated recoverable value. This mine equipment was replaced by equipment acquired under capital leases during the third quarter.

Loss on settlement of long-term debt of $13.1 million in 2017 relates to the write-off of deferred financing costs and additional interest expense incurred upon the settlement of the senior notes and the senior secured credit facility in June 2017.

The other non-recurring expenses in 2016 relates to special shareholder meeting costs and other non-recurring financing costs. For the nine months ended September 30, 2016, the Company incurred total costs of $4.9 million on legal and other advisory costs associated with a special shareholder meeting, a proxy contest and related litigation, and $0.6 million on other non-recurring financing costs.

9



TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

Revenues                                    
    Three months ended     Nine months ended  
    September 30,     September 30,  
(Cdn$ in thousands)   2017     2016     Change     2017     2016     Change  
Copper contained in concentrate   80,759     60,515     20,244     290,262     184,025     106,237  
Molybdenum concentrate   3,511     711     2,800     16,766     711     16,055  
Silver   402     1,128     (726 )   1,662     2,970     (1,308 )
Total gross revenue   84,672     62,354     22,318     308,690     187,706     120,984  
Less: treatment and refining costs   (6,164 )   (6,390 )   226     (25,799 )   (18,469 )   (7,330 )
Revenue   78,508     55,964     22,544     282,891     169,237     113,654  

(thousands of pounds, unless otherwise noted)                                    
Sales of copper in concentrate *   21,806     21,551     255     80,738     65,508     15,230  
Average realized copper price (US$ per pound)   3.00     2.15     0.85     2.76     2.13     0.63  
Average LME copper price (US$ per pound)   2.88     2.16     0.72     2.70     2.14     0.56  
Average exchange rate (US$/CAD)   1.25     1.30     (0.05 )   1.31     1.32     (0.01 )

* This amount includes a net smelter payable deduction of approximately 3.5% to derive net pounds of copper sold.

Copper revenues for the three and nine months ended September 30, 2017 increased by $20.2 million and $106.2 million, respectively, compared to the same periods in 2016, primarily due to an increase in copper sales volumes and higher realized copper prices.

During the three and nine months ended September 30, 2017, revenues include $0.9 million and $4.2 million, respectively, of favorable adjustments to provisionally priced copper concentrate. The provisional pricing adjustments contribute US$0.04 and US$0.05 per pound, respectively, to the average realized copper price for the three and nine months ended September 30, 2017.

Molybdenum revenues for the three and nine months ended September 30, 2017 increased by $2.8 million and $16.1 million, respectively, compared to the same periods in 2016, as the molybdenum circuit did not operate in the prior year until its restart in September 2016.

Cost of sales                                    
    Three months ended     Nine months ended  
    September 30,     September 30,  
(Cdn$ in thousands)   2017     2016     Change     2017     2016     Change  
Site operating costs   31,904     52,930     (21,026 )   122,098     159,146     (37,048 )
Transportation costs   4,498     3,544     954     15,207     11,149     4,058  
Changes in inventories of finished goods and                                    
ore stockpile   (3,027 )   (12,076 )   9,049     566     (9,156 )   9,722  
Production costs   33,375     44,398     (11,023 )   137,871     161,139     (23,268 )
Depletion and amortization   11,785     16,067     (4,282 )   33,161     43,715     (10,554 )
Cost of sales   45,160     60,465     (15,305 )   171,032     204,854     (33,822 )
Site operating costs per ton milled* $ 5.93   $ 9.47   $ (3.54 ) $ 7.41   $ 9.58   $ (2.17 )

*Non-GAAP performance measure. See page 21 of this MD&A.

10



TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

Site operating costs for the three and nine months ended September 30, 2017 decreased by 40% and 23%, respectively, from the same periods in 2016. The reduction in site operating costs was primarily due to the increased allocation of costs to capitalized stripping as a result of waste stripping in a new section of the Granite pit, in accordance with the mine plan.

Depletion and amortization for three and nine months ended September 30, 2017 decreased by 27% and 24% compared to the same periods in 2016, primarily due to the decreased amortization of capitalized stripping costs in the period.

Other operating (income) expenses                                    
    Three months ended     Nine months ended  
    September 30,     September 30,  
(Cdn$ in thousands)   2017     2016     Change     2017     2016     Change  
General and administrative   2,181     2,347     (166 )   9,941     9,198     743  
Share-based compensation   2,231     249     1,982     5,673     2,242     3,431  
Exploration and evaluation   450     479     (29 )   1,409     1,728     (319 )
Realized (gain) loss on copper put options   504     (18 )   522     1,089     986     103  
Unrealized loss on copper put options   647     567     80     1,072     567     505  
(Gain) loss on copper call option   -     (517 )   517     6,305     474     5,831  
Other operating expenses (income):                                    
 Write-down of mine equipment   3,551     -     3,551     3,551     -     3,551  
 Special shareholder meeting costs   -     81     (81 )   -     4,873     (4,873 )
 Other financing costs   -     -     -     -     616     (616 )
 Other income, net   (205 )   (264 )   (59 )   (751 )   (1,013 )   262  
    9,359     2,924     6,435     28,289     19,671     8,618  

General and administrative costs for the three months ended September 30, 2017 are consistent with the prior year.

General and administrative costs have increased for the nine months ended September 30, 2017 compared to the same period in 2016 due to a $0.5 million donation to a local hospital, additional legal costs related to the silver stream transaction, and because a portion of executive compensation in the first quarter of 2016 was issued in the form of PSU’s and reported separately as share-based compensation expense.

Share-based compensation expense increased for the nine months ended September 30, 2017, compared to the same period in 2016, primarily due to valuation adjustments for deferred share units and performance share units in the current year resulting from an increase in the Company’s share price. More information is set out in Note 15 of the September 30, 2017 unaudited condensed consolidated interim financial statements.

Exploration and evaluation costs for the three and nine months ended September 30, 2017, represent costs associated with the New Prosperity project.

During the third quarter of 2017, the Company incurred a realized loss of $0.5 million from copper put options, which relates to copper put options that settled out-of-the-money.

11



TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

In June 2017, the Company settled the copper call option obligation with a payment of $15.7 million to the senior secured credit facility lender. The loss on the copper call option for the three and nine months ended September 30, 2017 was $nil and $6.3 million, respectively.

A write-down of mine equipment of $3.6 million was recorded in the third quarter to adjust the carrying value of certain Gibraltar mine equipment to its estimated recoverable value. This mine equipment was replaced by equipment acquired under capital leases during the third quarter.

During the nine months ended September 30, 2016, the Company incurred total costs of $4.9 million on legal and other advisory costs associated with a special shareholder meeting, a proxy contest and related litigation, and $0.6 million on other non-recurring financing costs.

Finance expenses

    Three months ended     Nine months ended  
    September 30,     September 30,  
(Cdn$ in thousands)   2017     2016     Change     2017     2016     Change  
Interest expense   7,818     7,385     433     22,932     20,166     2,766  
Accretion of PER   567     579     (12 )   1,704     1,813     (109 )
Loss on settlement of long-term debt   -     -     -     13,102     -     13,102  
    8,385     7,964     421     37,738     21,979     15,759  

Interest expense for the three and nine months ended September 30, 2017 increased by $0.4 million and $2.8 million, respectively, compared to the same periods in 2016. The Company’s total interest costs are lower in the three months ended September 30, 2017 due to reduced long-term debt as a result of the June 2017 refinancing. However, the prior period includes capitalized interest of $1.4 million which was not capitalized in the current third quarter.

As part of the June 2017 refinancing, the Company redeemed its US$200 million senior notes and repaid its senior secured credit facility. The settlement of long-term debt resulted in a loss of $13.1 million in the second quarter of 2017, which includes a write-off of $9.2 million of deferred financing costs relating to the settled debt and additional interest costs of $3.9 million which were paid in lieu of notice to the note holders and the senior secured lender.

Income tax

    Three months ended     Nine months ended  
    September 30,     September 30,  
(Cdn$ in thousands)   2017     2016     Change     2017     2016     Change  
Current expense   420     -     420     1,396     -     1,396  
Deferred expense (recovery)   5,884     (4,330 )   10,214     22,675     (23,574 )   46,249  
    6,304     (4,330 )   10,634     24,071     (23,574 )   47,645  
Effective tax rate   23.8%     21.7%     2.1%     36.5%     39.2%     (2.7 )%
Canadian statutory rate   26%     26%     -     26%     26%     -  
B.C. Mineral tax rate   9.62%     9.62%     -     9.62%     9.62%     -  

12



TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

The current tax expense recorded is mainly the estimated B.C. Mineral taxes based on production at the Gibraltar Mine for the period. The deferred tax expense is due to the reversal of certain temporary differences related to the estimated taxable income for the three and nine months ended September 30, 2017.

The effective tax rate for the three and nine months ended September 30, 2017 was 23.8% and 36.5%, which differs from the statutory rate of 35.6% . The difference is a result of permanent differences related to non-deductible share-based compensation and expenditures incurred that are not deductible for corporate income tax and British Columbia Mineral Tax purposes.

FINANCIAL CONDITION REVIEW

Balance sheet review

    As at September 30,     As at December 31,        
(Cdn$ in thousands)   2017     2016     Change  
Cash and equivalents   95,669     89,030     6,639  
Other current assets   71,536     76,297     (4,761 )
Property, plant and equipment   766,753     730,208     36,545  
Other assets   53,432     53,904     (472 )
Total assets   987,390     949,439     37,951  
Current liabilities   55,135     38,641     16,494  
Debt:                  
 Senior secured notes   299,949     -     299,949  
 Senior notes   -     266,435     (266,435 )
 Senior secured credit facility   -     91,483     (91,483 )
 Capital leases and secured equipment loans   31,484     31,372     112  
Deferred revenue   39,453     -     39,453  
Other liabilities   184,283     182,569     1,714  
Total liabilities   610,304     610,500     (196 )
Equity   377,086     338,939     38,147  
Net debt (debt minus cash and equivalents)   235,764     300,260     (64,496 )
Total common shares outstanding (millions)   226.6     221.9     4.7  

The Company’s asset base is comprised principally of non-current assets, including property, plant and equipment, reflecting the capital intensive nature of the mining business. Other current assets include accounts receivable, other financial assets and inventories (supplies and production inventories), along with prepaid expenses and deposits. Production inventories, accounts receivable and cash balances fluctuate in relation to shipping and cash settlement schedules.

Total long-term debt decreased by $57.9 million in the nine months ended September 30, 2017, due to the refinancing transaction completed in the second quarter of 2017 and foreign exchange adjustments on the Company’s US dollar denominated debt. In the second quarter of 2017, the Company used the proceeds of a US$250 million senior secured note offering along with a portion of its cash on hand, to repay the US$200 million senior notes (due 2019) and the senior secured credit facility. The Company’s net debt has decreased by $64.5 million in the nine months ended September 30, 2017 primarily due to cash proceeds from the sale of a silver stream to Osisko Gold Royalties Ltd. (“Osisko”) and cash flow generated from mining operations.

13



TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

Deferred revenue relates to the US$33 million advance payment received in March 2017 from Osisko for the sale of future silver production from the Gibraltar Mine.

Other liabilities increased by $1.7 million mainly due to the increase to deferred and other tax liabilities, partially offset by reductions in the provision for environmental rehabilitation (“PER”) and other financial liabilities. Other financial liabilities decreased due primarily to the settlement of the copper call option obligation and a reclassification of a portion of the amount payable to BC Hydro to current liability. The current portion of the amount payable to BC Hydro under the deferred electricity payment program has been estimated based on recent copper prices.

The change in the PER is driven by changes in inflation and discount rates and a change in estimated costs. At September 30, 2017, the Bank of Canada long-term benchmark bond rate used as a proxy for long-term discount rates was 2.5% compared to 2.3% rate at December 31, 2016. Given the long time frame over which environmental rehabilitation expenditures are expected to be incurred (over 100 years), the carrying value of the provision is very sensitive to changes in discount rates.

As at October 26, 2017, there were 226,734,134 common shares outstanding. In addition, there were 10,744,000 stock options and 3,000,000 warrants outstanding at October 26, 2017. More information on these instruments and the terms of their exercise is set out in Notes 13 and 15 of the September 30, 2017 unaudited condensed consolidated interim financial statements.

Liquidity, cash flow and capital resources

During the nine months ended September 30, 2017 the Company generated $106 million of positive cash flow from operating and investing activities, which is a result of strong operating results at the Gibraltar Mine and includes $44 million of cash proceeds from the sale of a silver stream to Osisko. A portion of this cash flow was used to reduce long-term debt and other financial liabilities, as part of a refinancing completed on June 14, 2017. The Company used $72 million of cash on hand along with the net proceeds from an offering of US$250 million senior secured notes due 2022 to redeem its US$200 million senior notes due 2019, to repay its senior secured credit facility (due March 2019) and to settle the related copper call option.

Long-term debt and other financial liabilities have decreased by $74 million during the nine months ended September 30, 2017 and the Company has extended the maturity date of the long-term debt from 2019 to 2022.

At September 30, 2017, the Company had cash and equivalents of $96 million (December 31, 2016 - $89 million) and continues to maintain a strategy of retaining a significant cash balance to reflect the volatile and capital intensive nature of the copper mining business.

Cash flow provided by operations during the three months ended September 30, 2017 was $37.1 million compared to a cash outflow of $7.5 million for the same period in 2016. Cash used for investing activities during the three months ended September 30, 2017 was $32.2 million compared to cash outflow of $5.6 million for the same period in 2016. Investing activities in the third quarter of 2017 included $22.9 million for capitalized stripping costs, $3.4 million incurred on other capital expenditures for Gibraltar, $2.8 million in development costs for the Florence and Aley projects, and $2.0 million for the purchase of copper put options.

Cash used for financing activities during the three months ended September 30, 2017 includes $4.2 million of payments for capital leases and equipment loans, offset by proceeds of $0.2 million from the exercise of stock options.

The Company has a pipeline of development stage projects and additional funding will be required to advance these projects to production. To address future financing requirements, the Company may seek to raise additional capital through debt or equity financings or asset sales (including joint ventures or royalties). The Company may also redeem or repurchase senior secured notes on the market. From time to time, the Company evaluates these alternatives, based on a number of factors including the prevailing market prices of the senior notes, metal prices, our liquidity requirements, covenant restrictions and other factors, in order to determine the optimal mix of capital resources to address capital requirements, minimize the Company’s cost of capital, and maximize shareholder value.

14



TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

Future changes in copper and molybdenum market prices could also impact the timing and amount of cash available for future investment in development projects, debt obligations, and other uses of capital. To partially mitigate commodity price risks, copper put options are entered into for a portion of Gibraltar copper production (see section below “Hedging Strategy”).

Purchase and sale agreement with Osisko

On March 3, 2017, the Company entered into a silver stream purchase and sale agreement with Osisko, whereby the Company received an upfront cash deposit payment of US$33 million the sale of an equivalent amount of its 75% share of Gibraltar payable silver production until 5.9 million ounces of silver have been delivered to Osisko. After that threshold has been met, 35% of an equivalent amount of Taseko's share of all future payable silver production from Gibraltar will be delivered to Osisko. In addition to the initial deposit, the Company receives cash payments of US$2.75 per ounce for all silver deliveries made under the agreement.

The Company recorded the initial deposit as deferred revenue and recognizes amounts in revenue as silver is delivered to Osisko. The amortization of deferred revenue is calculated on a per unit basis using the estimated total number of silver ounces expected to be delivered to Osisko over the life of the Gibraltar Mine.

The silver sale agreement has a minimum term of 50 years and automatically renews for successive 10-year periods as long as Gibraltar mining operations are active. If the initial deposit is not fully reduced through silver deliveries, a cash payment for the remaining amount will be due to Osisko at the expiry date of the agreement. The Company’s obligations under the agreement are secured by a pledge of Taseko’s 75% interest in the Gibraltar Joint Venture.

In connection with the silver stream purchase and sale agreement with Osisko, the Company issued share purchase warrants to Osisko to acquire 3 million common shares of the Company at any time until April 1, 2020 at an exercise price of $2.74 per share.

Senior secured notes

In June 2017, the Company completed an offering of US$250 million aggregate principal amount of senior secured notes (“the Notes”). The Notes mature on June 15, 2022 and bear interest at an annual rate of 8.75%, payable semi-annually on June 15 and December 15, commencing on December 15, 2017. The Notes were issued at 99% of par value and the Company incurred other transaction costs of $9.2 million resulting in net proceeds from the offering of $317.6 million (US$240.5 million). The net proceeds were used, along with cash on hand, to redeem the senior notes and to repay the senior secured credit facility and to settle the related copper call option.

The Notes are secured by liens on the shares of Taseko’s wholly-owned subsidiary, Gibraltar Mines Ltd., and the subsidiary’s rights under the joint venture agreement relating to the Gibraltar mine. The Notes are guaranteed by each of Taseko’s existing and future restricted subsidiaries, other than certain immaterial subsidiaries. The Company is able to incur limited amounts of additional secured and unsecured debt under certain conditions as defined in the Note indenture. The Company is also subject to certain restrictions on asset sales, issuance of preferred stock, dividends and other restricted payments. However, there are no maintenance covenants with respect to the Company's financial performance.

15



TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

The Company may redeem some or all of the Notes at any time on or after June 15, 2019, at redemption prices ranging from 104.375% to 100%, plus accrued and unpaid interest to the date of redemption. Prior to June 15, 2019, all or part of the notes may be redeemed at 100%, plus a make-whole premium, plus accrued and unpaid interest to the date of redemption. In addition, until June 15, 2019, the Company may redeem up to 35% of the aggregate principal amount of the Notes, in an amount not greater than the net proceeds of certain equity offerings, at a redemption price of 108.750%, plus accrued and unpaid interest to the date of redemption. On a change of control, the Notes are redeemable at the option of the holder at a price of 101%.

Senior notes

In April 2011, the Company completed a public offering of US$200 million in senior unsecured notes. On June 14, 2017, the senior unsecured notes were redeemed at 100% of par value plus accrued interest to the redemption date for a total cost of $269.2 million (US$203.8 million).

The unsecured notes were scheduled to mature on April 15, 2019 and were bearing interest at a fixed annual rate of 7.75%, payable semi-annually. The notes were unsecured obligations guaranteed by the Company’s subsidiaries and the subsidiary guarantees were, in turn, guaranteed by the Company. The notes were redeemable by the Company at par value after April 2017.

Senior secured credit facility

On January 29, 2016, the Company entered into a US$70 million senior secured credit facility (the “Facility”) with EXP T1 Ltd., an affiliate of Red Kite. Amounts drawn under the Facility accrue interest on a monthly basis at a rate of three-month LIBOR plus 7.5% per annum, subject to a minimum LIBOR of 1% per annum. The loan principal and all accrued interest was payable upon maturity of the Facility on March 29, 2019. The Facility was repayable at any time without penalty and did not impose any off-take obligations on the Company.

The Facility was secured by a first priority charge over substantially all assets of the Company, including the Company’s 75% joint venture interest in the Gibraltar Mine, shares in all material subsidiaries and the Florence Copper project assets. The availability of the Facility was subject to conditions and covenants, including maintenance of a minimum working capital balance (as defined in the Facility) of US$20 million.

On June 14, 2017, the Facility plus all accrued interest was fully repaid for $104.9 million (US$79.4 million).

Upon entering into the Facility in January 2016, the Company issued a call option to the lender for 7,500 tonnes of copper with a strike price of US$2.04 per pound. The call option was to mature in March 2019 with an amount then payable to the lender based on the average copper price during the month of March 2019, subject to a maximum amount of US$15 million. On June 14, 2017 the Company settled the copper call option obligation with a payment to the lender of $15.7 million (US$11.9 million), based on the cancellation pay-out amount defined in the Facility agreement.

Upon entering into the Facility, the Company also issued share purchase warrants to acquire 4 million common shares of the Company at any time until May 9, 2019 at an exercise price of $0.51 per share. These warrants were exercised by the lender in February and March 2017 for proceeds of $2.0 million to the Company.

Hedging strategy

The Company’s hedging strategy is to secure a minimum price for a portion of copper production using put options that are either purchased outright or funded by the sale of call options that are significantly out of the money. The amount and duration of the hedge position is based on an assessment of business-specific risk elements combined with the copper pricing outlook. Copper price and quantity exposure are reviewed at least quarterly to ensure that adequate revenue protection is in place. Hedge positions are typically extended adding incremental quarters at established put strike prices to provide the necessary price protection. The Company’s hedging strategy is designed to mitigate short-term declines in copper price.

16



TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

Considerations on the cost of the hedging program include an assessment of Gibraltar’s estimated production costs, anticipated copper prices and the Company’s capital requirements during the relevant period. During the third quarter of 2017, the Company spent $2.0 million to purchase copper put options. The following table shows the commodity contracts that were outstanding as at the date of this MD&A.

  Notional amount Strike price Term to maturity Original cost
At October 26, 2017        
Copper put options 30 million lbs US$2.70 per lb Q4 2017 and Q1 2018 $2.0 million

Commitments and contingencies Commitments

At September 30, 2017, capital commitments totaled $2.4 million and the Company’s share of contractual operating commitments totaled $11.5 million.

Contingencies

The Company has guaranteed 100% of certain capital lease and equipment loans entered into by the Gibraltar joint venture in which it holds a 75% interest. As a result, the Company has guaranteed the joint venture partner’s 25% share of this debt which amounted to $10.5 million as at September 30, 2017.

SUMMARY OF QUARTERLY RESULTS

          2017                 2016                 2015  
(Cdn$ in thousands,   Q3     Q2     Q1     Q4     Q3     Q2     Q1     Q4  
except per share amounts)                                                
Revenues   78,508     99,994     104,389     94,628     55,964     55,090     58,183     61,412  
Net earnings (loss)   20,136     5,247     16,479     5,113     (15,610 )   (19,384 )   (1,515 )   (23,441 )
   Basic EPS   0.09     0.02     0.07     0.02     (0.07 )   (0.09 )   (0.01 )   (0.10 )
Adjusted net earnings (loss)*   13,405     14,305     15,254     16,404     (10,423 )   (19,758 )   (18,083 )   (13,112 )
   Adjusted basic EPS*   0.06     0.06     0.07     0.07     (0.05 )   (0.09 )   (0.08 )   (0.06 )
EBITDA*   48,457     43,805     49,145     32,312     4,064     (7,858 )   11,002     (9,162 )
Adjusted EBITDA*   42,356     42,820     47,934     44,477     9,285     (7,642 )   (4,492 )   1,415  

(US$ per pound, except where indicated)                                                
Realized copper price*   3.00     2.61     2.72     2.54     2.15     2.13     2.12     2.01  
Total operating costs*   1.18     1.31     1.33     1.48     1.89     2.07     2.11     1.85  
Copper sales (million pounds)   22.6     30.5     30.6     30.3     22.4     22.8     22.9     25.0  

*Non-GAAP performance measure. See page 21 of this MD&A

17



TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

Financial results for the last eight quarters reflect: volatile copper and molybdenum prices and foreign exchange rates that impact realized sale prices; and variability in the quarterly sales volumes due to copper grades and timing of shipments which impacts revenue recognition.

CRITICAL ACCOUNTING POLICIES AND ESTIMATES

The Company's significant accounting policies are presented in Note 2.5 of the 2016 annual consolidated financial statements and Note 2 of the September 30, 2017 condensed consolidated interim financial statements. The preparation of the financial statements in conformity with IFRS requires management to make judgments, estimates and assumptions that affect the application of accounting policies and the reported amounts of assets, liabilities, income and expenses. Actual results may differ from these estimates. Estimates and underlying assumptions are reviewed on an ongoing basis. Revisions to accounting estimates are recognized in the period in which the estimates are revised and in any future periods affected.

In the process of applying the Company’s accounting policies, significant areas where judgment is required include the determination of a joint arrangement and recovery of other deferred tax assets and deferred revenue determination.

Other significant areas of estimation include reserve and resource estimation and asset valuations; ore stock piles and finished inventory quantities; plant and equipment lives; tax provisions; provisions for environmental rehabilitation; valuation of financial instruments and derivatives; deferred stripping costs and share-based compensation. Key estimates and assumptions made by management with respect to these areas have been disclosed in the notes to these consolidated financial statements as appropriate.

The accuracy of reserve and resource estimates is a function of the quantity and quality of available data and the assumptions made and judgment used in the engineering and geological interpretation, and may be subject to revision based on various factors. Changes in reserve and resource estimates may impact the carrying value of property, plant and equipment; the calculation of depreciation expense; the capitalization of stripping costs incurred during production; and the timing of cash flows related to the provision for environmental rehabilitation.

Changes in forecast prices of commodities, exchange rates, production costs and recovery rates may change the economic status of reserves and resources. Forecast prices of commodities, exchange rates, production costs and recovery rates, and discount rates assumptions, either individually or collectively, may impact the carrying value of derivative financial instruments, inventories, property, plant and equipment, and intangibles, as well as the measurement of impairment charges or reversals.

INTERNAL CONTROLS OVER FINANCIAL REPORTING AND DISCLOSURE CONTROLS AND PROCEDURES

The Company's management is responsible for establishing and maintaining adequate internal control over financial reporting and disclosure controls and procedures.

The Company’s internal control system over financial reporting is designed to provide reasonable assurance to management and the Board of Directors regarding the preparation and fair presentation of published financial statements. Internal control over financial reporting includes those policies and procedures that:

(1)

pertain to the maintenance of records that in reasonable detail accurately and fairly reflect the transactions and dispositions of the assets of the Company;

18



TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

(2)

provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with IFRS, and that receipts and expenditures of the Company are being made only in accordance with authorizations of management and directors of the Company; and

   
(3)

provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or disposition of the Company’s assets that could have a material effect on the financial statements.

The Company’s internal control system over disclosure controls and procedures is designed to provide reasonable assurance that material information relating to the Company is made known to management and disclosed to others and information required to be disclosed by the Company in its annual filings, interim filings or other reports filed or submitted by us under securities legislation is recorded, processed, summarized and reported within the time periods specified in the securities legislation.

All internal control systems, no matter how well designed, have inherent limitations. Therefore, even those systems determined effective can provide only reasonable assurance with respect to financial reporting and disclosure.

There have been no changes in our internal controls over financial reporting and disclosure controls and procedures during the period ended September 30, 2017 that have materially affected, or are reasonably likely to materially affect, internal control over financial reporting and disclosure.

RELATED PARTY TRANSACTIONS

Key management personnel

Key management personnel include the members of the Board of Directors and executive officers of the Company.

The Company contributes to a post-employment defined contribution pension plan on the behalf of certain key management personnel. This retirement compensation arrangement (“RCA Trust”) was established to provide benefits to certain executive officers on or after retirement in recognition of their long service. Upon retirement, the participant is entitled to the distribution of the accumulated value of the contributions under the RCA Trust. Obligations for contributions to the defined contribution pension plan are recognized as compensation expense in the periods during which services are rendered by the executive officers.

Certain executive officers are entitled to termination and change in control benefits. In the event of termination without cause, other than a change in control, these executive officers are entitled to an amount ranging from 9-months’ to 18-months’ salary. In the event of a change in control, if a termination without cause or a resignation occurs within 12 months following the change of control, these executive officers are entitled to receive, among other things, an amount ranging from 24-months’ to 32-months’ salary and accrued bonus, and all stock options held by these individuals will fully vest.

Executive officers and directors also participate in the Company’s share-based compensation program (refer to Note 15 of the unaudited condensed consolidated interim financial statements).

19



TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

Compensation for key management personnel (including all members of the Board of Directors and executive officers) is as follows:

    Three months ended     Nine months ended  
    September 30,     September 30,  
(Cdn$ in thousands, except per share amounts)   2017     2016     2017     2016  
Salaries and benefits   697     791     4,169     4,281  
Post-employment benefits   373     373     1,119     937  
Share-based compensation   2,210     241     5,560     2,233  
    3,280     1,405     10,848     7,451  

Other related parties

Three directors of the Company are also principals of Hunter Dickinson Services Inc. (“HDSI”), a private company. HDSI invoices the Company for their executive services (director fees) and for other services provided by HDSI. For the three month period ended September 30, 2017, the Company incurred total costs of $0.3 million (Q3 2016: $0.3 million) in transactions with HDSI. Of these, $0.1 million (Q3 2016: $0.1 million) related to administrative, legal, exploration and tax services, $0.1 million related to reimbursements of office rent costs (Q3 2016: $0.1 million), and $0.1 million (Q3 2016: $0.1 million) related to director fees for two Taseko directors who are also principals of HDSI.

For the nine month period ended September 30, 2017, the Company incurred total costs of $1.1 million (2016: $1.1 million) in transactions with HDSI. Of these, $0.5 million (2016: $0.5 million) related to administrative, legal, exploration and tax services, $0.4 million related to reimbursements of office rent costs (2016: $0.4 million), and $0.2 million (2016: $0.2 million) related to director fees for two Taseko directors who are also principals of HDSI.

Under the terms of the joint venture operating agreement, the Gibraltar Joint Venture pays the Company a management fee for services rendered by the Company as operator of the Gibraltar Mine. In addition, the Company pays certain expenses on behalf of the Gibraltar Joint Venture and invoices the Joint Venture for these expenses.

20



TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

NON-GAAP PERFORMANCE MEASURES

This document includes certain non-GAAP performance measures that do not have a standardized meaning prescribed by IFRS. These measures may differ from those used by, and may not be comparable to such measures as reported by, other issuers. The Company believes that these measures are commonly used by certain investors, in conjunction with conventional IFRS measures, to enhance their understanding of the Company’s performance. These measures have been derived from the Company’s financial statements and applied on a consistent basis. The following tables below provide a reconciliation of these non-GAAP measures to the most directly comparable IFRS measure.

Total operating costs and site operating costs, net of by-product credits

Total costs of sales include all costs absorbed into inventory, as well as transportation costs. Site operating costs is calculated by removing net changes in inventory and depletion and amortization and transportation costs from cost of sales. Site operating costs, net of by-product credits is calculated by removing by-product credits from the site operating costs. Site operating costs, net of by-product credits per pound are calculated by dividing the aggregate of the applicable costs by copper pounds produced. Total operating costs per pound is the sum of site operating costs, net of by-product credits and off-property costs divided by the copper pounds produced. Byproduct credits are calculated based on actual sales of molybdenum (net of treatment costs) and silver during the period divided by the total pounds of copper produced during the period. These measures are calculated on a consistent basis for the periods presented.

    Three months ended     Nine months ended  
    September 30,     September 30,  
(Cdn$ in thousands, unless otherwise indicated) – 75%                        
basis   2017     2016     2017     2016  
Cost of sales   45,160     60,465     171,032     204,854  
Less:                        
   Depletion and amortization   (11,785 )   (16,067 )   (33,161 )   (43,715 )
   Net change in inventory   3,027     12,076     (566 )   9,156  
   Transportation costs   (4,498 )   (3,544 )   (15,207 )   (11,149 )
Site operating costs   31,904     52,930     122,098     159,146  
Less by-product credits:                        
   Molybdenum, net of treatment costs   (2,725 )   (508 )   (12,867 )   (508 )
   Silver, excluding amortization of deferred revenue   (107 )   (1,128 )   (637 )   (2,970 )
Site operating costs, net of by-product credits   29,072     51,294     108,594     155,668  
Total copper produced (thousand pounds)   26,306     24,838     86,780     69,426  
Total costs per pound produced   1.11     2.06     1.25     2.24  
Average exchange rate for the period (CAD/USD)   1.25     1.30     1.31     1.32  
Site operating costs, net of by-product credits (US$ per pound)   0.88     1.58     0.96     1.69  
Site operating costs, net of by-product credits   29,072     51,294     108,594     155,668  
Add off-property costs:                        
   Treatment and refining costs of copper concentrate   5,378     6,187     21,900     18,266  
   Transportation costs   4,498     3,544     15,207     11,149  
Total operating costs   38,948     61,025     145,701     185,083  
Total operating costs (C1) (US$ per pound)   1.18     1.89     1.28     2.02  

21



TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

Adjusted net income (loss)

Adjusted net income (loss) remove the effect of the following transactions from net income as reported under IFRS:

  • Unrealized foreign currency gains/losses;
  • Write-down of mine equipment;
  • Unrealized gain/loss on copper put options;
  • Loss on settlement of long-term debt;
  • Gain/loss on copper call option; and
  • Non-recurring transactions, including related tax adjustments.

Management believes these transactions do not reflect the underlying operating performance of our core mining business and are not necessarily indicative of future operating results. Furthermore, unrealized gains/losses on derivative instruments, changes in the fair value of financial instruments, and unrealized foreign currency gains/losses are not necessarily reflective of the underlying operating results for the reporting periods presented.

    Three months ended     Nine months ended  
    September 30,     September 30,  
($ in thousands, except per share amounts)   2017     2016     2017     2016  
Net income (loss)   20,136     (15,610 )   41,862     (36,509 )
   Unrealized foreign exchange (gain) loss   (10,299 )   5,090     (19,225 )   (16,587 )
   Write-down of mine equipment   3,551     -     3,551     -  
   Unrealized loss on copper put options   647     567     1,072     567  
   Loss on settlement of long-term debt   -     -     13,102     -  
   (Gain) loss on copper call option   -     (517 )   6,305     474  
   Other non-recurring expenses*   -     81     -     5,489  
   Estimated tax effect of adjustments   (630 )   (34 )   (3,702 )   (1,698 )
Adjusted net income (loss)   13,405     (10,423 )   42,965     (48,264 )
Adjusted EPS   0.06     (0.05 )   0.19     (0.22 )

* Other non-recurring expenses includes legal and other advisory costs associated with the special shareholder meeting, the proxy contest and related litigation, and other non-recurring financing costs.

EBITDA and adjusted EBITDA

EBITDA represents net income before interest, income taxes, and depreciation. EBITDA is presented because it is an important supplemental measure of our performance and is frequently used by securities analysts, investors and other interested parties in the evaluation of companies in the industry, many of which present EBITDA when reporting their results. Issuers of “high yield” securities also present EBITDA because investors, analysts and rating agencies consider it useful in measuring the ability of those issuers to meet debt service obligations. The Company believes EBITDA is an appropriate supplemental measure of debt service capacity, because cash expenditures on interest are, by definition, available to pay interest, and tax expense is inversely correlated to interest expense because tax expense goes down as deductible interest expense goes up; depreciation is a non-cash charge.

Adjusted EBITDA is presented as a further supplemental measure of the Company’s performance and ability to service debt. Adjusted EBITDA is prepared by adjusting EBITDA to eliminate the impact of a number of items that are not considered indicative of ongoing operating performance.

22



TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

Adjusted EBITDA is calculated by adding to EBITDA certain items of expense and deducting from EBITDA certain items of income that are not likely to recur or are not indicative of the Company’s future operating performance consisting of:

  • Unrealized foreign exchange gains/losses;
  • Write-down of mine equipment;
  • Unrealized gain/loss on copper put options;
  • Gain/loss on copper call option; and
  • Non-recurring transactions.

While some of the adjustments are recurring, other non-recurring expenses do not reflect the underlying performance of the Company’s core mining business and are not necessarily indicative of future results. Furthermore, unrealized gains/losses on derivative instruments, and unrealized foreign currency translation gains/losses are not necessarily reflective of the underlying operating results for the reporting periods presented.

    Three months ended     Nine months ended  
    September 30,     September 30,  
($ in thousands)   2017     2016     2017     2016  
Net income (loss)   20,136     (15,610 )   41,862     (36,509 )
Add:                        
   Depletion and amortization   11,785     16,066     33,161     43,799  
   Amortization of share-based compensation expense   2,250     253     5,779     2,300  
   Finance expense   8,385     7,964     37,738     21,979  
   Finance income   (403 )   (279 )   (1,204 )   (787 )
   Income tax expense (recovery)   6,304     (4,330 )   24,071     (23,574 )
EBITDA   48,457     4,064     141,407     7,208  
Adjustments:                        
   Unrealized foreign exchange (gain) loss   (10,299 )   5,090     (19,225 )   (16,587 )
   Write-down of mine equipment   3,551     -     3,551     -  
   Unrealized loss on copper put options   647     567     1,072     567  
   (Gain) loss on copper call option   -     (517 )   6,305     474  
   Other non-recurring expenses*   -     81     -     5,489  
Adjusted EBITDA   42,356     9,285     133,110     (2,849 )

* Other non-recurring expenses includes legal and other advisory costs associated with the special shareholder meeting, the proxy contest and related litigation, and other non-recurring financing costs.

Earnings (loss) from mining operations before depletion and amortization

Earnings (loss) from mining operations before depletion and amortization is earnings from mining operations with depletion and amortization added back. The Company discloses this measure, which has been derived from our financial statements and applied on a consistent basis, to provide assistance in understanding the results of the Company’s operations and financial position and it is meant to provide further information about the financial results to investors.

23



TASEKO MINES LIMITED
Management’s Discussion and Analysis
 

    Three months ended     Nine months ended  
    September 30,     September 30,  
(Cdn$ in thousands)   2017     2016     2017     2016  
Earnings (loss) from mining operations   33,348     (4,501 )   111,859     (35,617 )
Add:                        
   Depletion and amortization   11,785     16,067     33,161     43,715  
Earnings from mining operations before                        
depletion and amortization   45,133     11,566     145,020     8,098  

Site operating costs per ton milled

    Three months ended     Nine months ended  
    September 30,     September 30,  
(Cdn$ in thousands, except per ton milled amounts)   2017     2016     2017     2016  
Site operating costs (included in cost of sales)   31,904     52,930     122,098     159,146  
                         
Tons milled (thousands) (75% basis)   5,380     5,587     16,480     16,611  
Site operating costs per ton milled $ 5.93   $ 9.47   $ 7.41   $ 9.58  

24