COMMITMENTS AND CONTINGENCIES
12 Months Ended
Dec. 31, 2020
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies COMMITMENTS AND CONTINGENCIES
LEGAL PROCEEDINGS
We accrue losses for a legal proceeding when it is probable that a loss has been incurred and the amount of the loss can be reasonably estimated. However, the uncertainties inherent in legal proceedings make it difficult to reasonably estimate the costs and effects of resolving these matters. Accordingly, actual costs incurred may differ materially from amounts accrued, may exceed applicable insurance coverage and could materially adversely affect our business, cash flows, results of operations, financial condition and prospects. Unless otherwise indicated, we are unable to estimate reasonably possible losses in excess of any amounts accrued.
At December 31, 2020, loss contingency accruals for legal matters, including associated legal fees and regulatory matters related to the Leak, that are probable and estimable were $616 million for Sempra Energy Consolidated and $471 million for SoCalGas. Amounts for Sempra Energy Consolidated and SoCalGas include $445 million for matters related to the Leak, which we discuss below. We discuss our policy regarding accrual of legal fees in Note 1.
SoCalGas
Aliso Canyon Natural Gas Storage Facility Gas Leak
From October 23, 2015 through February 11, 2016, SoCalGas experienced a natural gas leak from one of the injection-and-withdrawal wells, SS25, at its Aliso Canyon natural gas storage facility in Los Angeles County. As described below in “Civil and Criminal Litigation” and “Regulatory Proceedings,” numerous lawsuits, investigations and regulatory proceedings have been
initiated in response to the Leak, resulting in significant costs, which together with other Leak-related costs are discussed below in “Cost Estimates, Accounting Impact and Insurance.”
Civil and Criminal Litigation. As of February 22, 2021, 395 lawsuits, including approximately 36,000 plaintiffs, are pending against SoCalGas related to the Leak, some of which have also named Sempra Energy. All these cases, other than a matter brought by the Los Angeles County District Attorney and the federal securities class action discussed below, are coordinated before a single court in the LA Superior Court for pretrial management.
In November 2017, in the coordinated proceeding, individuals and business entities filed a Third Amended Consolidated Master Case Complaint for Individual Actions, through which their separate lawsuits will be managed for pretrial purposes. The consolidated complaint asserts causes of action for negligence, negligence per se, private and public nuisance (continuing and permanent), trespass, inverse condemnation, strict liability, negligent and intentional infliction of emotional distress, fraudulent concealment, loss of consortium, wrongful death and violations of Proposition 65 against SoCalGas and Sempra Energy. The consolidated complaint seeks compensatory and punitive damages for personal injuries, lost wages and/or lost profits, property damage and diminution in property value, injunctive relief, costs of future medical monitoring, civil penalties (including penalties associated with Proposition 65 claims alleging violation of requirements for warning about certain chemical exposures), and attorneys’ fees. The initial trial previously scheduled for June 2020 for a small number of randomly selected individual plaintiffs was postponed, with a new trial date yet to be determined by the court.
In January 2017, two consolidated class action complaints were filed against SoCalGas and Sempra Energy, one on behalf of a putative class of persons and businesses who own or lease real property within a five-mile radius of the well (the Property Class Action), and a second on behalf of a putative class of all persons and entities conducting business within five miles of the facility (the Business Class Action). The Property Class Action asserts claims for strict liability for ultra-hazardous activities, negligence, negligence per se, violation of the California Unfair Competition Law, trespass, permanent and continuing public and private nuisance, and inverse condemnation. The Business Class Action asserts a claim for violation of the California Unfair Competition Law. Both complaints seek compensatory, statutory and punitive damages, injunctive relief and attorneys’ fees.
Three property developers filed complaints in July and October of 2018 against SoCalGas and Sempra Energy alleging causes of action for strict liability, negligence per se, negligence, continuing nuisance, permanent nuisance and violation of the California Unfair Competition Law, as well as claims for negligence against certain directors of SoCalGas. The complaints seek compensatory, statutory and punitive damages, injunctive relief and attorneys’ fees.
In October 2018 and January 2019, complaints were filed on behalf of 51 firefighters stationed near the Aliso Canyon natural gas storage facility who allege they were injured by exposure to chemicals released during the Leak. The complaints against SoCalGas and Sempra Energy assert causes of actions for negligence, negligence per se, private and public nuisance (continuing and permanent), trespass, inverse condemnation, strict liability, negligent and intentional infliction of emotional distress, fraudulent concealment and loss of consortium. The complaints seek compensatory and punitive damages for personal injuries, lost wages and/or lost profits, property damage and diminution in property value, and attorney’s fees.
Four shareholder derivative actions were filed alleging breach of fiduciary duties against certain officers and certain directors of Sempra Energy and/or SoCalGas. Three of the actions were joined in an Amended Consolidated Shareholder Derivative Complaint, which was dismissed with prejudice in January 2021. The remaining action was also dismissed but plaintiffs were given leave to amend their complaint.
In addition, a federal securities class action alleging violation of the federal securities laws was filed against Sempra Energy and certain of its officers in July 2017 in the U.S. District Court for the Southern District of California. In March 2018, the court dismissed the action with prejudice. The plaintiffs have appealed the dismissal.
In February 2019, the LA Superior Court approved a settlement between SoCalGas and the Los Angeles City Attorney’s Office, the County of Los Angeles, the California Office of the Attorney General and CARB of three actions filed by these entities under which SoCalGas made payments and agreed to provide funding for environmental projects totaling $120 million, including $21 million in civil penalties, as well as other safety-related commitments.
In September 2016, SoCalGas settled a misdemeanor criminal complaint filed in February 2016 by the Los Angeles County District Attorney’s Office against SoCalGas, pleading no contest to a charge that it failed to provide timely notice of the Leak pursuant to California Health and Safety Code section 25510(a), Los Angeles County Code section 12.56.030, and Title 19 California Code of Regulations section 2703(a). In November 2016, the LA Superior Court approved the settlement and entered judgment on the notice charge. Under the settlement, SoCalGas paid a $75,000 fine, $233,500 in penalties, and $246,673 to reimburse costs incurred by Los Angeles County Fire Department’s Health and Hazardous Materials Division, as well as completed operational commitments estimated to cost approximately $6 million. Certain individuals who objected to the settlement petitioned the Court of Appeal to vacate the judgment, contending they should be granted restitution. In July 2019, the
Court of Appeal denied the petition in part, but remanded the matter to the trial court to give the petitioners an opportunity to prove damages stemming from only the three-day delay in reporting the Leak. Following the hearing, the trial court denied restitution. In December 2020, the California Supreme Court denied review of the ruling.
Regulatory Proceedings. In January 2016, CalGEM and the CPUC directed an independent analysis of the technical root cause of the Leak to be conducted by Blade. In May 2019, Blade released its report, which concluded that the Leak was caused by a failure of the production casing of the well due to corrosion and that attempts to stop the Leak were not effectively conducted, but did not identify any instances of non-compliance by SoCalGas. Blade concluded that SoCalGas’ compliance activities conducted prior to the Leak did not find indications of a casing integrity issue. Blade opined, however, that there were measures, none of which were required by gas storage regulations at the time, that could have been taken to aid in the early identification of corrosion and that, in Blade’s opinion, would have prevented or mitigated the Leak. The report also identified well safety practices and regulations that have since been adopted by CalGEM and implemented by SoCalGas, which address most of the root cause of the Leak identified during Blade’s investigation.
In June 2019, the CPUC opened an OII to consider penalties against SoCalGas for the Leak, which it later bifurcated into two phases. The first phase will consider whether SoCalGas violated California Public Utilities Code Section 451 or other laws, CPUC orders or decisions, rules or requirements, whether SoCalGas engaged in unreasonable and/or imprudent practices with respect to its operation and maintenance of the Aliso Canyon natural gas storage facility or its related record-keeping practices, whether SoCalGas cooperated sufficiently with the SED and Blade during the pre-formal investigation, and whether any of the mitigation proposed by Blade should be implemented to the extent not already done. In November 2019, the SED, based largely on the Blade report, alleged a total of 330 violations, asserting that SoCalGas violated California Public Utilities Code Section 451 and failed to cooperate in the investigation and to keep proper records. Hearings on a subset of issues are scheduled to begin in March 2021. The second phase will consider whether SoCalGas should be sanctioned for the Leak and what damages, fines or other penalties or sanctions, if any, should be imposed for any violations, unreasonable or imprudent practices, or failure to sufficiently cooperate with the SED as determined by the CPUC in the first phase. In addition, the second phase will determine the amounts of various costs incurred by SoCalGas and other parties in connection with the Leak and the ratemaking treatment or other disposition of such costs, which could result in little or no recovery of such costs by SoCalGas. SoCalGas has engaged in settlement discussions with the SED in connection with this proceeding.
In February 2017, the CPUC opened a proceeding pursuant to SB 380 OII to determine the feasibility of minimizing or eliminating the use of the Aliso Canyon natural gas storage facility while still maintaining energy and electric reliability for the region, but excluding issues with respect to air quality, public health, causation, culpability or cost responsibility regarding the Leak. The CPUC issued a decision on the interim range of gas inventory levels at the Aliso Canyon natural gas storage facility in November 2020 with a final determination to be made within the SB 380 OII proceeding. The first phase of the proceeding established a framework for the hydraulic, production cost and economic modeling assumptions for the potential reduction in usage or elimination of the Aliso Canyon natural gas storage facility. Phase 2 of the proceeding, which will evaluate the impacts of reducing or eliminating the Aliso Canyon natural gas storage facility using the established framework and models, began in the first quarter of 2019. In December 2019, the CPUC added a third phase of the proceeding and engaged a consultant to consider alternative means for meeting or avoiding the demand for the facility’s services if it were eliminated in either the 2027 or 2045 timeframe, which is currently underway.
If the Aliso Canyon natural gas storage facility were to be permanently closed, or if future cash flows from its operation were otherwise insufficient to recover its carrying value, it could result in an impairment of the facility and significantly higher than expected operating costs and/or additional capital expenditures, and natural gas reliability and electric generation could be jeopardized. At December 31, 2020, the Aliso Canyon natural gas storage facility had a net book value of $821 million. Any significant impairment of this asset, or higher operating costs and additional capital expenditures incurred by SoCalGas that may not be recoverable in customer rates, could have a material adverse effect on SoCalGas’ and Sempra Energy’s results of operations, financial condition and cash flows.
Cost Estimates, Accounting Impact and Insurance. SoCalGas has incurred significant costs for temporary relocation of community residents; to control the well and stop the Leak; to mitigate the natural gas released; to purchase natural gas to replace what was lost through the Leak; to defend against and, in certain cases, settle, civil and criminal litigation arising from the Leak; to pay the costs of the government-ordered response to the Leak, including the costs for Blade to conduct the root cause analysis described above; to respond to various government and agency investigations regarding the Leak; and to comply with increased regulation imposed as a result of the Leak. At December 31, 2020, SoCalGas estimates its costs related to the Leak are $1,627 million (the cost estimate), which includes $1,279 million of costs recovered or probable of recovery from insurance. This cost estimate may increase significantly as more information becomes available. A substantial portion of the cost estimate has been paid, and $451 million is accrued as Reserve for Aliso Canyon Costs as of December 31, 2020 on SoCalGas’ and Sempra Energy’s Consolidated Balance Sheets.
In 2020, SoCalGas recorded $484 million in costs, inclusive of estimated legal costs, related to settlement discussions in connection with civil litigation and regulatory matters described above in “Civil and Criminal Litigation” and “Regulatory Proceedings.” Of this amount, $177 million was recorded in Insurance Receivable for Aliso Canyon Costs on the SoCalGas and Sempra Energy Consolidated Balance Sheets and $307 million ($233 million after tax) was recorded in Aliso Canyon Litigation and Regulatory Matters on the SoCalGas and Sempra Energy Consolidated Statements of Operations. These accruals are included in the cost estimate that we describe above.
Except for the amounts paid or estimated to settle certain actions, as described in “Civil and Criminal Litigation” and “Regulatory Proceedings” above, the cost estimate does not include litigation, regulatory proceedings or regulatory costs to the extent it is not possible to predict at this time the outcome of these actions or reasonably estimate the costs to defend or resolve the actions or the amount of damages, restitution, or civil, administrative or criminal fines, sanctions, penalties or other costs or remedies that may be imposed or incurred. The cost estimate also does not include certain other costs incurred by Sempra Energy associated with defending against shareholder derivative lawsuits and other potential costs that we currently do not anticipate incurring or that we cannot reasonably estimate. These costs not included in the cost estimate could be significant and could have a material adverse effect on SoCalGas’ and Sempra Energy’s cash flows, financial condition and results of operations.
We have received insurance payments for many of the costs included in the cost estimate, including temporary relocation and associated processing costs, control-of-well expenses, costs of the government-ordered response to the Leak, certain legal costs and lost gas. As of December 31, 2020, we recorded the expected recovery of the cost estimate related to the Leak of $445 million as Insurance Receivable for Aliso Canyon Costs on SoCalGas’ and Sempra Energy’s Consolidated Balance Sheets. This amount is exclusive of insurance retentions and $834 million of insurance proceeds we received through December 31, 2020. We intend to pursue the full extent of our insurance coverage for the costs we have incurred. Other than insurance for certain future defense costs we may incur as well as directors’ and officers’ liability, we have exhausted all of our insurance in this matter. We continue to pursue other sources of insurance coverage for costs related to this matter, but we may not be successful in obtaining additional insurance recovery for any of these costs. If we are not able to secure additional insurance recovery, if any costs we have recorded as an insurance receivable are not collected, if there are delays in receiving insurance recoveries, or if the insurance recoveries are subject to income taxes while the associated costs are not tax deductible, such amounts, which could be significant, could have a material adverse effect on SoCalGas’ and Sempra Energy’s cash flows, financial condition and results of operations.
Sempra Mexico
Energía Costa Azul
IEnova has been engaged in a long-running land dispute relating to property adjacent to its ECA Regas Facility that allegedly overlaps with land owned by the ECA Regas Facility (the facility, however, is not situated on the land that is the subject of this dispute). A claimant to the adjacent property filed complaints in the federal Agrarian Court challenging the refusal of SEDATU in 2006 to issue title to him for the disputed property. In November 2013, the federal Agrarian Court ordered that SEDATU issue the requested title and cause it to be registered. Both SEDATU and IEnova challenged the ruling due to lack of notification of the underlying process. In May 2019, a federal court in Mexico reversed the ruling and ordered a retrial.
Four other cases involving two adjacent areas of real property on which part of the ECA Regas Facility is situated, each brought by a single plaintiff or her descendants, remain pending against the facility. The first disputed area is subject to a claim in the federal Agrarian Court that has been ongoing since 2006, in which the plaintiffs seek to annul the property title for a portion of the land on which the ECA Regas Facility is situated and to obtain possession of a different parcel that allegedly overlaps with the site of the ECA Regas Facility. The second disputed area is one parcel adjacent to the ECA Regas Facility that allegedly overlaps with land on which the ECA Regas Facility is situated, which is subject to a claim in the Agrarian Court and two claims in civil courts. The Agrarian Court proceeding, which seeks an order that SEDATU issue title to the plaintiff, was initiated in 2013 and the parties are awaiting a final decision. The two civil court proceedings, which seek to invalidate the contract by which the ECA Regas Facility purchased the applicable parcel of land on which the ECA Regas Facility is situated on the grounds that the purchase price was allegedly unfair, are progressing at different stages. In the first, initiated in 2013, a lower court ruled in favor of the ECA Regas Facility and the ruling has been appealed by the plaintiff. The same plaintiff filed the second civil case in 2019, which is in its initial stages.
Certain of these land disputes involve land on which portions of the ECA LNG liquefaction facilities are proposed to be situated or on which portions of the ECA Regas Facility that would be necessary for the operation of the proposed ECA LNG liquefaction facilities are situated.
Several administrative challenges are pending before Mexico’s Secretariat of Environment and Natural Resources (the Mexican environmental protection agency) and Federal Tax and Administrative Courts, seeking revocation of the environmental impact
authorization issued to the ECA Regas Facility in 2003. These cases generally allege that the conditions and mitigation measures in the environmental impact authorization are inadequate and challenge findings that the activities of the terminal are consistent with regional development guidelines.
In 2018, two related claimants filed separate challenges in the federal district court in Ensenada, Baja California in relation to the environmental and social impact permits issued by each of Agencia de Seguridad, Energía y Ambiente (ASEA) and SENER to ECA LNG authorizing natural gas liquefaction activities at the ECA Regas Facility. In the first case, the court issued a provisional injunction in September 2018. In December 2018, ASEA approved modifications to the environmental permit that facilitate the development of the proposed natural gas liquefaction facility in two phases. In May 2019, the court canceled the provisional injunction. The claimant appealed the court’s decision canceling the injunction, but was not successful. The claimant’s underlying challenge to the permits remains pending. In the second case, the initial request for a provisional injunction was denied. That decision was reversed on appeal in January 2020, resulting in the issuance of a new injunction against the same environmental and social impact permits that were already issued by ASEA and SENER. This injunction has uncertain application absent clarification by the court. The reversal and issuance of the injunction in the second case is under further appeal.
In September 2020, parties claiming a property interest in the land on which the ECA Regas Facility is situated and the proposed ECA LNG liquefaction facilities are anticipated to be situated filed an administrative proceeding with the Municipality of Ensenada against the permit for the construction of the proposed liquefaction export projects at the ECA Regas Facility. The ECA Regas Facility and ECA LNG contested the validity of the claim and the Municipality of Ensenada has confirmed the validity of the construction permit and closed the proceeding.
In May 2020, the two third-party capacity customers at the ECA Regas Facility, Shell Mexico and Gazprom, asserted that a 2019 update of the general terms and conditions for service at the facility, as approved by the CRE, resulted in a breach of contract by IEnova and a force majeure event. Citing these circumstances, the customers subsequently stopped making payments of amounts due under their respective LNG storage and regasification agreements. IEnova has rejected the customers’ assertions and has drawn (and expects to continue to draw) on the customers’ letters of credit provided as payment security. The parties engaged in discussions under the applicable contractual dispute resolution procedures without coming to a mutually acceptable resolution. In July 2020, Shell Mexico submitted a request for arbitration of the dispute and although Gazprom has joined the proceeding, Gazprom has replenished the amounts drawn on its letter of credit and has resumed making regular monthly payments under its LNG storage and regasification agreement. IEnova intends to avail itself of its available claims, defenses, rights and remedies in the arbitration proceeding, including seeking dismissal of the customers’ claims. In addition to the arbitration proceeding, Shell Mexico also filed a constitutional challenge to the CRE’s approval of the update to the general terms and conditions. In October 2020, Shell Mexico’s request to stay CRE’s approval was denied and, subsequently, Shell Mexico filed an appeal of that decision.
One or more unfavorable final decisions on these disputes or challenges could materially and adversely affect our existing natural gas regasification operations and proposed natural gas liquefaction projects at the site of the ECA Regas Facility.
Guaymas-El Oro Segment of the Sonora Pipeline
IEnova’s Sonora natural gas pipeline consists of two segments, the Sasabe-Puerto Libertad-Guaymas segment, and the Guaymas-El Oro segment. Each segment has its own service agreement with the CFE. In 2015, the Yaqui tribe, with the exception of some members living in the Bácum community, granted its consent and a right-of-way easement agreement for the construction of the Guaymas-El Oro segment of the Sonora natural gas pipeline that crosses its territory. Representatives of the Bácum community filed a legal challenge in Mexican federal court demanding the right to withhold consent for the project, the stoppage of work in the Yaqui territory and damages. In 2016, the judge granted a suspension order that prohibited the construction of such segment through the Bácum community territory. Because the pipeline does not pass through the Bácum community, IEnova did not believe the 2016 suspension order prohibited construction in the remainder of the Yaqui territory. Construction of the Guaymas-El Oro segment was completed, and commercial operations began in May 2017.
Following the start of commercial operations of the Guaymas-El Oro segment, IEnova reported damage to the Guaymas-El Oro segment of the Sonora pipeline in the Yaqui territory that has made that section inoperable since August 2017 and, as a result, IEnova declared a force majeure event. In 2017, an appellate court ruled that the scope of the 2016 suspension order encompassed the wider Yaqui territory, which has prevented IEnova from making repairs to put the pipeline back in service. In July 2019, a federal district court ruled in favor of IEnova and held that the Yaqui tribe was properly consulted and that consent from the Yaqui tribe was properly received. Representatives of the Bácum community appealed this decision, causing the suspension order preventing IEnova from repairing the damage to the Guaymas-El Oro segment of the Sonora pipeline in the Yaqui territory to remain in place until the appeals process is exhausted.
IEnova exercised its rights under the contract, which included seeking force majeure payments for the two-year period such force majeure payments were required to be made, which ended in August 2019.
In July 2019, the CFE filed a request for arbitration generally to nullify certain contract terms that provide for fixed capacity payments in instances of force majeure and made a demand for substantial damages in connection with the force majeure event. In September 2019, the arbitration process ended when IEnova and the CFE reached an agreement to restart natural gas transportation service on the earlier of completion of repair of the damaged pipeline or January 15, 2020, and to modify the tariff structure and extend the term of the contract by 10 years. Subsequently, IEnova and the CFE agreed to extend the service start date to May 15, 2020 and then again to September 15, 2020. In the third quarter of 2020, the parties agreed to further extend the service start date to March 14, 2021. Under the revised agreement, the CFE will resume making payments only when the damaged section of the Guaymas-El Oro segment of the Sonora pipeline is repaired. If the pipeline is not repaired by March 14, 2021 and the parties do not agree on a new service start date, IEnova retains the right to terminate the contract and seek to recover its reasonable and documented costs and lost profits.
If IEnova is unable to make such repairs and resume operations in the Guaymas-El Oro segment of the Sonora pipeline within this time frame or if IEnova terminates the contract and is unable to obtain recovery, there may be a material adverse impact on Sempra Energy’s results of operations and cash flows and our ability to recover the carrying value of our investment. At December 31, 2020, the Guaymas-El Oro segment of the Sonora pipeline had a net book value of $447 million. The Sasabe-Puerto Libertad-Guaymas segment of the Sonora pipeline remains in full operation and is not impacted by these developments.
Regulatory Actions by the Mexican Government that Impact Renewable Energy Facilities
In April 2020, Mexico’s CENACE issued an order that it claims would safeguard Mexico’s national power grid from interruptions that may be caused by renewable energy projects. The main provision of the order suspends all legally mandated pre-operative testing that would be needed for new renewable energy projects to commence operations and prevents such projects from connecting to the national power grid until further notice. IEnova’s renewable energy projects affected by the order filed for legal protection through amparo claims (constitutional protection lawsuits) and, in June 2020, received injunctive relief until the claims are resolved by the courts. We have since achieved commercial operations on two solar power generation projects, Tepezalá and Don Diego, and expect to achieve commercial operations on Border Solar in the first half of 2021. The second phase of ESJ is not impacted by the order because it is not interconnected to the Mexican electric grid.
In May 2020, Mexico’s SENER published a resolution to establish guidelines intended to guarantee the security and reliability of the national grid’s electricity supply by reducing the threat that it claims is caused by clean, intermittent energy. IEnova’s renewable energy projects, including those in construction and in service, filed amparo claims against the SENER resolution in June 2020 and received injunctive relief in July 2020. In addition, in June 2020, COFECE, Mexico’s antitrust regulator, filed a complaint with Mexico’s Supreme Court against the SENER resolution. The court accepted COFECE’s complaint and, in February 2021, issued its final ruling that the main proposed changes in the SENER resolution are unconstitutional.
In May 2020, the CRE approved an update to the transmission rates included in legacy renewables and cogeneration energy contracts, based on the claim that the legacy transmission rates did not reflect fair and proportional costs for providing the applicable services and, therefore, created inequitable competitive conditions. Three of IEnova’s renewables facilities are currently holders of contracts with such legacy rates, and any increases in the transmission rates would be passed through directly to their customers. IEnova filed amparo claims for its affected facilities and, in August 2020, was granted injunctive relief.
IEnova and other companies affected by these new orders and regulations have challenged the orders and regulations by filing amparo claims, some of which have been granted injunctive relief. The court-ordered injunctions provide relief until Mexico’s Federal District Court ultimately resolves the amparo claims. An unfavorable final decision on these amparo challenges, or the potential for an extended dispute, could impact our ability to successfully complete construction of our Border Solar project, which is not yet commercially operating, or to complete such construction in a timely manner and within expected budgets, may impact our ability to operate our wind and solar facilities already in service at existing levels or at all, and may adversely affect our ability to develop new projects, any of which may have a material adverse impact on our results of operations and cash flows and our ability to recover the carrying values of our renewable energy investments in Mexico.
In October 2020, the CRE approved a resolution to amend the rules for the inclusion of new offtakers of legacy generation and self-supply permits (the Offtaker Resolution), which became effective immediately. The Offtaker Resolution prohibits self-supply permit holders from adding new offtakers that were not included in the original development or expansion plans, making modifications to the amount of energy allocated to the named offtakers, and including load centers that have entered into a supply arrangement under Mexico’s Electricity Industry Law. Don Diego Solar and Border Solar (two of IEnova’s projects, the first of which has achieved commercial operations and the second of which is currently in construction) and the Ventika wind power generation facilities are holders of legacy self-supply permits and are impacted by the Offtaker Resolution. If IEnova is not able to obtain legal protection for these impacted facilities, IEnova expects it will sell Border Solar’s capacity and a portion of Don Diego Solar’s capacity affected by the Offtaker Resolution into the spot market. Currently, prices in the spot market are significantly
lower than the fixed prices in the PPAs that were entered into through self-supply permits. IEnova has filed lawsuits against the Offtaker Resolution. Currently, Border Solar and Don Diego Solar are prohibited from delivering electric power to all (with respect to Border Solar) or a portion (with respect to Don Diego Solar) of their respective offtakers pending final resolution of these lawsuits. IEnova is evaluating ways to obtain injunctive relief that would allow Border Solar and Don Diego Solar to deliver electric power to their offtakers pending a final decision in the lawsuits.
Other Litigation
RBS Sempra Commodities
Sempra Energy holds an equity method investment in RBS Sempra Commodities, a limited liability partnership in the process of being liquidated. RBS, now NatWest Markets plc, our partner in the JV, paid an assessment of £86 million (approximately $138 million in U.S. dollars) in October 2014 to HMRC for denied VAT refund claims filed in connection with the purchase of carbon credit allowances by RBS SEE, a subsidiary of RBS Sempra Commodities. RBS SEE has since been sold to J.P. Morgan Chase & Co. and later to Mercuria Energy Group, Ltd. HMRC asserted that RBS was not entitled to reduce its VAT liability by VAT paid on certain carbon credit purchases during 2009 because RBS knew or should have known that certain vendors in the trading chain did not remit their own VAT to HMRC. After paying the assessment, RBS filed a Notice of Appeal of the assessment with the First-Tier Tribunal. Trial on the matter, which could include the assessment of a penalty of up to 100% of the claimed amount, is scheduled to begin in June 2021.
In 2015, liquidators filed a claim in the High Court of Justice against RBS and Mercuria Energy Europe Trading Limited (the Defendants) on behalf of 10 companies (the Liquidating Companies) that engaged in carbon credit trading via chains that included a company that traded directly with RBS SEE. The claim alleges that the Defendants’ participation in the purchase and sale of carbon credits resulted in the Liquidating Companies’ carbon credit trading transactions creating a VAT liability they were unable to pay, and that the Defendants are liable to provide for equitable compensation due to dishonest assistance and for compensation under the U.K. Insolvency Act of 1986. Trial on the matter was held in June and July of 2018. In March 2020, the High Court of Justice rendered its judgment mostly in favor of the Liquidating Companies and awarded damages of approximately £45 million (approximately $61 million in U.S. dollars at December 31, 2020), plus costs and interest. In October 2020, the High Court of Justice issued an order granting the Defendants permission to appeal its March 2020 judgment to the Court of Appeal, and the Defendants have filed an application for such appeal.
Although the final outcome of both the High Court of Justice case and First-Tier Tribunal case remains uncertain, we recorded $100 million in equity losses from our investment in RBS Sempra Commodities in Equity Earnings on the Sempra Energy Consolidated Statement of Operations in the year ended December 31, 2020, which represents an estimate of our obligations to settle pending tax matters and related legal costs.
Asbestos Claims Against EFH Subsidiaries
Certain EFH subsidiaries that we acquired as part of the merger of EFH with an indirect subsidiary of Sempra Energy are defendants in personal injury lawsuits brought in state courts throughout the U.S. As of February 22, 2021, 209 such lawsuits are pending with 77 such lawsuits having been served. These cases allege illness or death as a result of exposure to asbestos in power plants designed and/or built by companies whose assets were purchased by predecessor entities to the EFH subsidiaries, and generally assert claims for product defects, negligence, strict liability and wrongful death. They seek compensatory and punitive damages. Additionally, in connection with the EFH bankruptcy proceeding, approximately 28,000 proofs of claim were filed on behalf of persons who allege exposure to asbestos under similar circumstances and assert the right to file such lawsuits in the future. None of these claims or lawsuits were discharged in the EFH bankruptcy proceeding. The costs to defend or resolve these lawsuits and the amount of damages that may be imposed or incurred could have a material adverse effect on Sempra Energy’s cash flows, financial condition and results of operations.
We are also defendants in ordinary routine litigation incidental to our businesses, including personal injury, employment litigation, product liability, property damage and other claims. Juries have demonstrated an increasing willingness to grant large awards, including punitive damages, in these types of cases.
LEASES
A lease exists when a contract conveys the right to control the use of an identified asset for a period of time in exchange for consideration. We determine if an arrangement is or contains a lease at inception of the contract.
Some of our lease agreements contain nonlease components, which represent activities that transfer a separate good or service to the lessee. As the lessee for both operating and finance leases, we have elected to combine lease and nonlease components as a single lease component for real estate, fleet vehicles, power generating facilities, and pipelines, whereby fixed or in-substance fixed payments allocable to the nonlease component are accounted for as part of the related lease liability and ROU asset. As the lessor, we have elected to combine lease and nonlease components as a single lease component for real estate and power generating facilities if the timing and pattern of transfer of the lease and nonlease components are the same and the lease component would be classified as an operating lease if accounted for separately.
Lessee Accounting
We have operating and finance leases for real and personal property (including office space, land, fleet vehicles, machinery and equipment, warehouses and other operational facilities) and PPAs with renewable energy and peaker plant facilities.
Some of our leases include options to extend the lease terms for up to 20 years, or to terminate the lease within one year. Our lease liabilities and ROU assets are based on lease terms that may include such options when it is reasonably certain that we will exercise the option.
Certain of our contracts are short-term leases, which have a lease term of 12 months or less at lease commencement. We do not recognize a lease liability or ROU asset arising from short-term leases for all existing classes of underlying assets. In such cases, we recognize short-term lease costs on a straight-line basis over the lease term. Our short-term lease costs for the period reasonably reflect our short-term lease commitments.
Certain of our leases contain escalation clauses requiring annual increases in rent ranging from 2% to 4% or based on the Consumer Price Index. The rentals payable under these leases may increase by a fixed amount each year or by a percentage of a base year. Variable lease payments that are based on an index or rate are included in the initial measurement of our lease liability and ROU asset based on the index or rate at lease commencement and are not remeasured because of changes to the index or rate. Rather, changes to the index or rate are treated as variable lease payments and recognized in the period in which the obligation for those payments is incurred.
Similarly, PPAs for the purchase of renewable energy at SDG&E require lease payments based on a stated rate per MWh produced by the facilities, and we are required to purchase substantially all the output from the facilities. SDG&E is required to pay additional amounts for capacity charges and actual purchases of energy that exceed the minimum energy commitments. Under these contracts, we do not recognize a lease liability or ROU asset for leases for which there are no fixed lease payments. Rather, these variable lease payments are recognized separately as variable lease costs. SDG&E estimates these variable lease payments to be $297 million in each of 2021 and 2022, $296 million in 2023, $297 million in 2024, $296 million in 2025 and $3,069 million thereafter.
As of the lease commencement date, we recognize a lease liability for our obligation to make future lease payments, which we initially measure at present value using our incremental borrowing rate at the date of lease commencement, unless the rate implicit in the lease is readily determinable. We determine our incremental borrowing rate based on the rate of interest that we would have to pay to borrow, on a collateralized basis over a similar term, an amount equal to the lease payments in a similar economic environment. We also record a corresponding ROU asset, initially equal to the lease liability and adjusted for lease payments made at or before lease commencement, lease incentives, and any initial direct costs. We test ROU assets for recoverability whenever events or changes in circumstances have occurred that may affect the recoverability or the estimated useful lives of the ROU assets.
For our operating leases, our non-regulated entities recognize a single lease cost on a straight-line basis over the lease term in operating expenses. The California Utilities recognize this single lease cost on a basis that is consistent with the recovery of such costs in accordance with U.S. GAAP governing rate-regulated operations.
For our finance leases, the interest expense on the lease liability and amortization of the ROU asset are accounted for separately. Our non-regulated entities use the effective interest rate method to account for the imputed interest on the lease liability and amortize the ROU asset on a straight-line basis over the lease term. The California Utilities recognize amortization of the ROU asset on a basis that is consistent with the recovery of such costs in accordance with U.S. GAAP governing rate-regulated operations.
Our leases do not contain any material residual value guarantees, restrictions or covenants.
Classification of ROU assets and lease liabilities and the weighted-average remaining lease term and discount rate associated with operating and finance leases are summarized in the table below.
LESSEE INFORMATION ON THE CONSOLIDATED BALANCE SHEETS
(Dollars in millions)
Sempra Energy ConsolidatedSDG&ESoCalGas
December 31,
202020192020201920202019
Right-of-use assets:
Operating leases:
Right-of-use assets
$543 $591 $102 $130 $74 $94 
Finance leases:
Property, plant and equipment
1,429 1,353 1,356 1,326 73 27 
Accumulated depreciation
(99)(64)(80)(57)(19)(7)
Property, plant and equipment, net
1,330 1,289 1,276 1,269 54 20 
Total right-of-use assets$1,873 $1,880 $1,378 $1,399 $128 $114 
Lease liabilities:
Operating leases:
Other current liabilities
$52 $52 $27 $27 $18 $18 
Deferred credits and other
407 445 73 102 56 75 
459 497 100 129 74 93 
Finance leases:
Current portion of long-term debt and finance leases
36 26 26 20 10 
Long-term debt and finance leases
1,294 1,263 1,250 1,250 44 13 
1,330 1,289 1,276 1,270 54 19 
Total lease liabilities$1,789 $1,786 $1,376 $1,399 $128 $112 
Weighted-average remaining lease term (in years):
Operating leases
13136656
Finance leases
1819192076
Weighted-average discount rate:
Operating leases5.81 %6.01 %3.62 %3.55 %2.03 %3.73 %
Finance leases
14.45 %14.76 %14.65 %14.83 %2.83 %3.23 %
The components of lease costs were as follows:
LESSEE INFORMATION ON THE CONSOLIDATED STATEMENTS OF OPERATIONS(1)
(Dollars in millions)
Sempra Energy ConsolidatedSDG&ESoCalGas
Years ended December 31,
202020192020201920202019
Operating lease costs$92 $96 $31 $33 $24 $27 
Finance lease costs:
Amortization of ROU assets(2)
35 24 23 18 12 
Interest on lease liabilities
188 173 186 173 — 
Total finance lease costs
223 197 209 191 14 
Short-term lease costs(3)
— — 
Variable lease costs(3)
477 482 467 471 10 10 
Total lease costs
$799 $781 $710 $697 $48 $43 
(1)    Includes costs capitalized in PP&E.
(2)    Included in O&M, except for $18 million in 2020 and $15 million in 2019, which is included in Depreciation and Amortization Expense at Sempra Energy Consolidated and SDG&E.
(3)    Short-term leases with variable lease costs are recorded and presented as variable lease costs.

Cash paid for amounts included in the measurement of lease liabilities was as follows:
LESSEE INFORMATION ON THE CONSOLIDATED STATEMENTS OF CASH FLOWS
(Dollars in millions)
Sempra Energy ConsolidatedSDG&ESoCalGas
Years ended December 31
202020192020201920202019
Operating activities:
Cash paid for operating leases
$79 $101 $31 $33 $24 $27 
Cash paid for finance leases
173 173 171 173 — 
Financing activities:
Cash paid for finance leases
35 24 23 18 12 
Increase (decrease) in operating lease obligations for right-of-use assets
20 585 (1)158 118 
Increase in finance lease obligations for investment in
PP&E
77 38 30 16 47 22 
The table below presents the maturity analysis of our lease liabilities and reconciliation to the present value of lease liabilities:
LESSEE MATURITY ANALYSIS OF LIABILITIES
(Dollars in millions)
December 31, 2020
Sempra Energy ConsolidatedSDG&ESoCalGas
Operating leases
Finance leases(1)
Operating leases
Finance leases(1)
Operating leasesFinance leases
2021$73 $206 $30 $194 $19 $12 
202264 203 22 194 17 
202355 203 17 194 13 
202451 198 15 189 11 
202540 193 185 
Thereafter415 2,465 22 2,453 12 
Total undiscounted lease payments
698 3,468 111 3,409 77 59 
Less: imputed interest(239)(2,138)(11)(2,133)(3)(5)
Total lease liabilities
459 1,330 100 1,276 74 54 
Less: current lease liabilities(52)(36)(27)(26)(18)(10)
Long-term lease liabilities
$407 $1,294 $73 $1,250 $56 $44 
(1)    Substantially all amounts are related to purchased-power contracts.
Lease Disclosures Under Previous U.S. GAAP
Rent expense for operating leases was as follows:
RENT EXPENSE – OPERATING LEASES
(Dollars in millions)
 Year ended December 31, 2018
Sempra Energy Consolidated$122 
SDG&E27 
SoCalGas41 
The annual amortization charge for PPAs accounted for as capital leases at both Sempra Energy Consolidated and SDG&E was $11 million in 2018. The annual depreciation charge for fleet vehicles and other assets in 2018 was $8 million at Sempra Energy Consolidated, including $2 million at SDG&E and $6 million at SoCalGas.
Lessor Accounting
Sempra Mexico is a lessor for certain of its natural gas and ethane pipelines, compressor stations and LPG storage facilities. These operating leases expire at various dates from 2021 through 2039.
Sempra Mexico expects to continue to derive value from the underlying assets associated with its pipelines following the end of their respective lease terms based on the expected remaining useful life, expected market conditions and plans to re-market and re-contract the underlying assets.
Generally, we recognize operating lease income on a straight-line basis over the lease term and evaluate the underlying asset for impairment. Certain of our leases contain rate adjustments or are based on foreign currency exchange rates that may result in lease payments received that vary in amount from one period to the next.
We provide information below for leases for which we are the lessor.
LESSOR INFORMATION – SEMPRA ENERGY
(Dollars in millions)
December 31,
20202019
Assets subject to operating leases:
Property, plant and equipment(1)
$1,092 $1,038 
Accumulated depreciation(228)(179)
Property, plant and equipment, net
$864 $859 
December 31, 2020
Maturity analysis of operating lease payments:
2021$207 
2022202 
2023202 
2024202 
2025202 
Thereafter2,344 
Total undiscounted cash flows
$3,359 
(1)     Included in Machinery and Equipment — Pipelines and Storage within the major functional categories of PP&E.

LESSOR INFORMATION ON THE CONSOLIDATED STATEMENTS OF OPERATIONS SEMPRA ENERGY
(Dollars in millions)
Years ended December 31,
202020192018
Fixed lease payments$195 $200 $194 
Variable lease payments72 
Total revenues from operating leases(1)
$196 $206 $266 
Depreciation expense$39 $38 $72 
(1)     Included in Revenues: Energy-Related Businesses on the Consolidated Statements of Operations.
CONTRACTUAL COMMITMENTS
Natural Gas Contracts
SoCalGas has responsibility for procuring natural gas for both SDG&E’s and SoCalGas’ core customers in a combined portfolio. SoCalGas buys natural gas under short-term and long-term contracts for this portfolio from various producing regions in the southwestern U.S., U.S. Rockies and Canada, primarily based on published monthly bid-week indices.
SoCalGas transports natural gas primarily under long-term firm interstate pipeline capacity agreements that provide for annual reservation charges, which are recovered in rates. SoCalGas has commitments with interstate pipeline companies for firm pipeline capacity under contracts that expire at various dates through 2032.
Sempra LNG has various capacity agreements for natural gas storage and transportation. Transportation costs on these agreements vary based on pipeline capacity.
Payments on our natural gas contracts could exceed the minimum commitment based on portfolio needs. At December 31, 2020, the future minimum payments under existing natural gas contracts and natural gas storage and transportation contracts are as follows:
FUTURE MINIMUM PAYMENTS – SEMPRA ENERGY CONSOLIDATED
(Dollars in millions)   
 Storage and
transportation
Natural gas(1)
Total(1)
2021$216 $61 $277 
2022203 13 216 
2023189 12 201 
2024166 12 178 
2025131 137 
Thereafter1,014 — 1,014 
Total minimum payments$1,919 $104 $2,023 
(1)    Excludes amounts related to the LNG purchase agreement discussed below.

FUTURE MINIMUM PAYMENTS – SOCALGAS
(Dollars in millions)   
 TransportationNatural gasTotal
2021$134 $41 $175 
2022126 — 126 
2023123 — 123 
2024103 — 103 
202568 — 68 
Thereafter359 — 359 
Total minimum payments$913 $41 $954 

Total payments under natural gas contracts and natural gas storage and transportation contracts as well as payments to meet additional portfolio needs at Sempra Energy Consolidated and SoCalGas were as follows:
PAYMENTS UNDER NATURAL GAS CONTRACTS
(Dollars in millions)   
 Years ended December 31,
 202020192018
Sempra Energy Consolidated$989 $1,326 $1,345 
SoCalGas935 1,181 1,169 
LNG Purchase Agreement
Sempra LNG has a sale and purchase agreement for the supply of LNG to the ECA Regas Facility. The commitment amount is calculated using a predetermined formula based on estimated forward prices of the index applicable from 2021 to 2029. Although this agreement specifies a number of cargoes to be delivered, under its terms, the customer may divert certain cargoes, which would reduce amounts paid under the agreement by Sempra LNG.
At December 31, 2020, the following LNG commitment amounts are based on the assumption that all cargoes, less those already confirmed to be diverted, under the agreement are delivered:
LNG COMMITMENT AMOUNTS
(Dollars in millions)
2021$320 
2022422 
2023389 
2024386 
2025390 
Thereafter1,452 
Total$3,359 
Actual LNG purchases in 2020, 2019 and 2018 have been significantly lower than the maximum amount provided under the agreement due to the customer electing to divert cargoes as allowed by the agreement.
Purchased-Power Contracts
For 2021, SDG&E expects to meet its customer power requirements from the following resource types:
Long-term contracts: 28% (of which 27% is provided by renewable energy contracts expiring on various dates through 2041)
Other SDG&E-owned generation and tolling contracts: 43%
Spot market purchases: 29%
Payments on our purchased-power contracts could exceed the minimum commitments based on energy needs. At December 31, 2020, the future minimum payments under long-term purchased-power contracts for Sempra Energy Consolidated and SDG&E are as follows:
FUTURE MINIMUM PAYMENTS – PURCHASED-POWER CONTRACTS
(Dollars in millions)
2021$222 
2022208 
2023173 
2024145 
202588 
Thereafter794 
Total minimum payments(1)
$1,630 
(1)    Excludes purchase agreements accounted for as finance leases.

Payments on these contracts represent capacity charges and minimum energy and transmission purchases that exceed the minimum commitment. SDG&E is required to pay additional amounts for actual purchases of energy that exceed the minimum energy commitments. SDG&E estimates these variable payments to be $66 million in each of 2021 and 2022, $67 million in 2023, $65 million in 2024, $66 million in 2025 and $541 million thereafter. Total payments under purchased-power contracts for Sempra Energy Consolidated and SDG&E were $534 million in 2020, $744 million in 2019 and $712 million in 2018.
Construction and Development Projects
Sempra Energy Consolidated has various capital projects in progress in the U.S. and Mexico. Our total contractual commitments at December 31, 2020 under these projects are approximately $696 million, requiring future payments of $525 million in 2021, $22 million in 2022, $19 million in 2023, $16 million in each of 2024 and 2025 and $98 million thereafter. The following is a summary by segment of contractual commitments and contingencies related to such projects.
SDG&E
At December 31, 2020, SDG&E has commitments to make future payments of $25 million for construction projects that include:
$1 million for infrastructure improvements for electric and natural gas transmission and distribution systems; and
$24 million related to spent fuel management at SONGS.
SDG&E expects future payments under these contractual commitments to be $2 million in 2021, $1 million in each of 2022 through 2025 and $19 million thereafter.
Sempra Mexico
At December 31, 2020, Sempra Mexico has commitments to make future payments of $610 million for construction projects that include:
$349 million for liquid fuels terminals;
$249 million for natural gas pipelines and ongoing maintenance services; and
$12 million for renewables projects.
Sempra Mexico expects future payments under these contractual commitments to be $466 million in 2021, $19 million in 2022, $16 million in 2023, $15 million in each of 2024 and 2025 and $79 million thereafter.
Sempra LNG
At December 31, 2020, Sempra LNG has commitments to make future payments of $61 million primarily for natural gas liquefaction development costs and natural gas transportation projects. Sempra LNG expects future payments under these contractual commitments to be $57 million in 2021, $2 million in each of 2022 and 2023.
OTHER COMMITMENTS
SDG&E
We discuss nuclear insurance and nuclear fuel disposal related to SONGS in Note 15.
In connection with the completion of the Sunrise Powerlink project in 2012, the CPUC required that SDG&E establish a fire mitigation fund to minimize the risk of fire as well as reduce the potential wildfire impact on residences and structures near the Sunrise Powerlink. The future payments for these contractual commitments, for which a liability has been recorded, are expected to be $4 million per year in 2021 through 2025 and $279 million thereafter, subject to escalation of 2% per year, for a remaining 49-year period. At December 31, 2020, the present value of these future payments of $121 million has been recorded as a regulatory asset as the amounts represent a cost that we expect will be recovered from customers in the future.
Sempra LNG
Additional consideration for a 2006 comprehensive legal settlement with the State of California to resolve the Continental Forge litigation included an agreement that, for a period of 18 years beginning in 2011, Sempra LNG would sell to the California Utilities, subject to annual CPUC approval, up to 500 MMcf per day of regasified LNG from Sempra Mexico’s ECA Regas Facility that is not delivered or sold in Mexico at the price indexed to the California border minus $0.02 per MMBtu. There are no specified minimums required, and to date, Sempra LNG has not been required to deliver any natural gas pursuant to this agreement.
ENVIRONMENTAL ISSUES
Our operations are subject to federal, state and local environmental laws. We also are subject to regulations related to hazardous wastes, air and water quality, land use, solid waste disposal and the protection of wildlife. These laws and regulations require that we investigate and correct the effects of the release or disposal of materials at sites associated with our past and our present operations. These sites include those at which we have been identified as a PRP under the federal Superfund laws and similar state laws.
In addition, we are required to obtain numerous governmental permits, licenses and other approvals to construct facilities and operate our businesses. The related costs of environmental monitoring, pollution control equipment, cleanup costs, and emissions fees are significant. Increasing national and international concerns regarding global warming and mercury, carbon dioxide, nitrogen oxide and sulfur dioxide emissions could result in requirements for additional pollution control equipment or significant emissions fees or taxes that could adversely affect Sempra LNG and Sempra Mexico. The California Utilities’ costs to operate their facilities in compliance with these laws and regulations generally have been recovered in customer rates.
We disclose any proceeding under environmental laws to which a government authority is a party when the potential monetary sanctions, exclusive of interest and costs, exceed the lesser of $1 million or 1% of current assets, which was $45 million for Sempra Energy Consolidated, $16 million for SDG&E and $15 million for SoCalGas at December 31, 2020.
We discuss environmental matters related to the natural gas leak at SoCalGas’ Aliso Canyon natural gas storage facility above in “Legal Proceedings – SoCalGas – Aliso Canyon Natural Gas Storage Facility Gas Leak.”
Other Environmental Issues
We generally capitalize the significant costs we incur to mitigate or prevent future environmental contamination or extend the life, increase the capacity, or improve the safety or efficiency of property used in current operations. The following table shows our capital expenditures (including construction work in progress) in order to comply with environmental laws and regulations:
CAPITAL EXPENDITURES FOR ENVIRONMENTAL ISSUES
(Dollars in millions)
 Years ended December 31,
 202020192018
Sempra Energy Consolidated$76 $80 $100 
SDG&E39 39 38 
SoCalGas37 41 62 

We have not identified any significant environmental issues outside the U.S.
At the California Utilities, costs that relate to current operations or an existing condition caused by past operations are generally recorded as a regulatory asset due to the probability that these costs will be recovered in rates.
The environmental issues currently facing us, except for those related to the Aliso Canyon natural gas storage facility leak as we discuss above or resolved during the last three years, include (1) investigation and remediation of the California Utilities’ manufactured-gas sites, (2) cleanup of third-party waste-disposal sites used by the California Utilities at which we have been identified as a PRP and (3) mitigation of damage to the marine environment caused by the cooling-water discharge from SONGS.
The table below shows the status at December 31, 2020 of the California Utilities’ manufactured-gas sites and the third-party waste-disposal sites for which we have been identified as a PRP:
STATUS OF ENVIRONMENTAL SITES
 
# Sites
complete(1)
# Sites
in process
SDG&E:  
Manufactured-gas sites— 
Third-party waste-disposal sites
SoCalGas:
Manufactured-gas sites39 
Third-party waste-disposal sites
(1)    There may be ongoing compliance obligations for completed sites, such as regular inspections, adherence to land use covenants and water quality monitoring.

We record environmental liabilities when our liability is probable and the costs can be reasonably estimated. In many cases, however, investigations are not yet at a stage where we can determine whether we are liable or, if the liability is probable, to reasonably estimate the amount or range of amounts of the costs. Estimates of our liability are further subject to uncertainties such as the nature and extent of site contamination, evolving cleanup standards and imprecise engineering evaluations. We review our accruals periodically and, as investigations and cleanups proceed, we make adjustments as necessary.
The following table shows our accrued liabilities for environmental matters at December 31, 2020. Of the total liability, $9 million at SoCalGas is recorded on a discounted basis, with a discount rate of 1.5%.
ACCRUED LIABILITIES FOR ENVIRONMENTAL MATTERS
(Dollars in millions)
 Manufactured-
gas sites
Waste
disposal
sites (PRP)(1)
Other
hazardous
waste sites
Total(2)
SDG&E(3)
$— $$13 $19 
SoCalGas(4)
36 40 
Other— — 
Total Sempra Energy$36 $10 $14 $60 
(1)    Sites for which we have been identified as a PRP.
(2)    Includes $11 million, $1 million and $10 million classified as current liabilities, and $49 million, $18 million and $30 million classified as noncurrent liabilities on Sempra Energy’s, SDG&E’s and SoCalGas’ Consolidated Balance Sheets, respectively.
(3)    Does not include SDG&E’s liability for SONGS marine environment mitigation.
(4)    Does not include SoCalGas’ liability for environmental matters for the Leak. We discuss matters related to the Leak above in “Legal Proceedings – SoCalGas – Aliso Canyon Natural Gas Storage Facility Gas Leak.”

In connection with the issuance of operating permits, SDG&E and the other owners of SONGS previously reached an agreement with the CCC to mitigate the damage to the marine environment caused by the cooling-water discharge from SONGS during its operation. SONGS’ early retirement, described in Note 15, does not reduce SDG&E’s mitigation obligation. SDG&E’s share of the estimated mitigation costs is $84 million, of which $47 million has been incurred through December 31, 2020 and $37 million is accrued for remaining costs through 2053, which is recoverable in rates and included in noncurrent Regulatory Assets on Sempra Energy’s and SDG&E’s Consolidated Balance Sheets.
We expect future payments related to our environmental liabilities on an undiscounted basis to be $12 million in 2021, $16 million in 2022, $3 million in 2023, $6 million in 2024, $3 million in 2025 and $58 million thereafter.