Close-down and restoration provisions
12 Months Ended
Dec. 31, 2022
Disclosure of other provisions [abstract]  
Close-down and restoration provisions
Recognition and measurement
The Group has provisions for close-down and restoration costs which include the dismantling and demolition of infrastructure, the removal of residual materials and the remediation of disturbed areas for mines and certain refineries and smelters. The obligation may occur during development or during the production phase of a facility. These provisions are based on all regulatory requirements and any other commitments made to stakeholders. The provision excludes the impact of future disturbance which is planned to occur during the life of mine, so that it represents only incurred disturbance as at the balance sheet date.
Closure provisions are not made for those operations that have no known restrictions on their lives as the closure dates cannot be reliably estimated, instead a contingent liability is disclosed, refer to note 37. This applies primarily to certain Canadian smelters which have indefinite-lived water rights from local governments permitting electricity generation from hydro-power stations.
Close-down and restoration costs are a normal consequence of mining or production, and the majority of close-down and restoration expenditure is incurred in the years following closure of the mine, refinery or smelter. Although the ultimate cost to be incurred is uncertain, the Group’s businesses estimate their costs using current restoration standards, techniques and expected climate conditions. The costs are estimated on the basis of a closure plan, and are reviewed at each reporting period during the life of the operation to reflect known developments. The estimates are also subject to formal review, with appropriate external support, at regular intervals.
The timing of closure and the rehabilitation plans for the site can be uncertain and dependent upon future capital allocation decisions which involve estimation of future economic circumstances and business cases. In such circumstances, the closure provision is estimated using probability weighting of the different remediation and closure scenarios.
The initial close-down and restoration provision is capitalised within “Property, plant and equipment”. Subsequent movements in the close-down and restoration provisions for ongoing operations are treated as an adjustment to cost within “Property, plant and equipment”. This includes those resulting from new disturbance related to expansions or other activities qualifying for capitalisation; updated cost estimates; changes to the estimated lives of operations; changes to the timing of closure activities; and revisions to discount rates.
Changes in closure provisions relating to closed operations are charged/credited to “Net operating costs” in the income statement.

Where rehabilitation is conducted systematically over the life of the operation, rather than at the time of closure, provision is made for the estimated outstanding continuous rehabilitation work at each balance sheet date and the cost is charged to the income statement.
The closure provision is represented by forecast future underlying cash flows expressed in real terms at the balance sheet date. These are discounted for the time value of money based on a long-term view of low-risk market yields which includes a review of historic trends plus risks and opportunities for which future cash flows have not been adjusted, namely potential improvements in closure practices between the reporting date and the point at which rehabilitation spend takes place. The real-terms discount rate used is 1.5% (2021: 1.5%) which is applied to all locations since we expect to meet closure cash flows principally from US dollar revenues and financing, with activities co-ordinated by the Group's central closure team.
To roll forward those real-terms cash flows between periods, we identify local rates of inflation based on Producer Price Inflation (PPI) indices and together with the real-terms discount rate unwind the discount through the line “amortisation of discount”, shown within “Finance items” in the income statement. This nominal rate for cost escalation in the current financial year is estimated at the start of each half-year and applied systematically for six months. At the end of each half-year we update the underlying cash flows for the latest estimate of experienced inflation for the current financial year and record this as “changes to existing provisions”. For operating sites this adjustment usually results in a corresponding adjustment to Property, Plant and Equipment and for closed and fully impaired sites the adjustment is charged or credited to the income statement.
In some cases, our subsidiaries make a contribution to trust funds in order to meet or reimburse future environmental and decommissioning costs. Amounts due for reimbursement from trust funds are not offset against the corresponding closure provision unless payments into the fund have the effect of passing the closure obligation to the trust.
Environmental costs result from environmental damage that was not a necessary consequence of operations, and may include remediation, compensation and penalties. Provision is made for the estimated present value of such costs at the balance sheet date. These costs are charged to “Net operating costs”, except for the unwinding of the discount which is shown within “Finance items”.
Remediation procedures may commence soon after the time the disturbance, remediation process and estimated remediation costs become known, but can continue for many years depending on the nature of the disturbance and the remediation techniques used.

Note
2022
US$m
2021
US$m
At 1 January
14,542 13,335 
Adjustment on currency translation
(699)(483)
Adjustments to mining properties/right of use assets:13 
– increases to existing and new provisions520 518 
Charged/(credited) to profit:
– increases to existing and new provisions
541 1,475 
– unused amounts reversed
(72)(192)
– exchange losses on provisions
17 23 
– amortisation of discount
1,517 415 
Utilised in year
(609)(541)
Transfers and other movements(8)
At 31 December(a)
15,759 14,542 
Balance sheet analysis:
Current
1,142 1,023 
Non-current
14,617 13,519 
Total
15,759 14,542 
(a)Close-down, restoration and environmental liabilities at 31 December 2022 have not been adjusted for closure-related receivables amounting to US$351 million (2021: US$410 million) due from the ERA trust fund and other financial assets held for the purposes of meeting closure obligations. These are included within “Receivables and other assets” on the balance sheet.


Key judgment - Close-down, restoration and environmental obligations
We use our judgment and experience to determine the potential scope of closure rehabilitation work required to meet the Group’s legal, statutory and constructive obligations, and any other commitments made to stakeholders, and the options and techniques available to meet those obligations and estimate the associated costs and the likely timing of those costs. Significant judgment is also required to determine both the costs associated with that work and the other assumptions used to calculate the provision. External experts support the cost estimation process where appropriate but there remains significant estimation uncertainty.
The key judgment in applying this accounting policy is determining when an estimate is sufficiently reliable to make or adjust a closure provision. Adjustments are made to provisions when the range of possible outcomes becomes sufficiently narrow to permit reliable estimation. Depending on the materiality of the change, adjustments may require review and endorsement by the Group’s Closure Steering Committee before the provision is updated.
Cost estimates are updated throughout the life of the operation; generally cost estimates must comply with the Group’s Capital Project Framework once the operation is ten years from expected closure. This means, for example, that where an Order of Magnitude (OoM) study is required for closure it must be of the same standard as an OoM study for a new mine, smelter or refinery. As at 31 December 2022, there are 16 operations with remaining lives of under 10 years before taking into account unapproved extensions. The largest closure study finalised during 2022 related to the Ranger Uranium mine operated by Energy Resources of Australia. In 2021 the preliminary information from this study resulted in an increase to closure liabilities of US$510 million; the finalisation of the study in 2022 did not result in a further significant change.
In some cases, the closure study may indicate that monitoring and, potentially, remediation will be required indefinitely - for example, ground water treatment. In these cases the underlying cash flows for the provision may be restricted to a period for which the costs can be reliably estimated, which on average is around 30 years. Where an alternative commercial arrangement to meet our obligations can be predicted with confidence, this period may be shorter.
Closure provisions are not made for those operations that have no known restrictions on their lives as the closure dates cannot be reliably estimated. This applies primarily to certain Canadian smelters which have indefinite-lived water rights or power agreements for renewable power sources with local governments, refer to note 37.
14     Close-down and restoration provisions continued
Analysis of close-down and restoration/environmental clean-up provisions
As at 31 December
2022
US$m

2021
US$m
Undiscounted close-down and environmental restoration obligations20,433 18,775 
Impact of discounting(4,674)(4,233)
Present closure obligation15,759 14,542 
Attributable to:
Operating sites11,598 10,727 
Non-operating sites4,161 3,815 
Total15,759 14,542 
Projected cash spend for the undiscounted close-down and restoration/environmental clean-up provision
Undiscounted close-down and environmental restoration cash flows<1 year
US$m
1-3 years
US$m
3-5 years
US$m
> 5 years
US$m
Total
US$m
At 31 December 20221,142 1,986 1,426 15,879 20,433 
At 31 December 20211,023 1,652 1,680 14,420 18,775 
Remaining lives of operations and infrastructure range from one to over 50 years with an average for all sites, weighted by present closure obligation, of around 15 years. Although the ultimate cost to be incurred is uncertain, the Group’s businesses estimate their respective costs based on current restoration standards, techniques and expected climate conditions.


Key estimate - Close-down, restoration and environmental obligations
The most significant assumptions and estimates used in calculating the provision are:
Closure timeframes. The weighted average remaining lives of operations is shown below. Some expenditure may be incurred before closure while the operation as a whole is in production.
The length of any post-closure monitoring period. This will depend on the specific site requirements and the availability of alternative commercial arrangements; some expenditure can continue into perpetuity. The Rio Tinto Kennecott closure and environmental remediation provision includes an allowance for ongoing monitoring and remediation costs, including ground water treatment, of approximately US$0.7 billion.
The probability weighting of possible closure scenarios. The most significant impact of probability weighting is at the Pilbara operations (Iron Ore) relating to infrastructure and incorporates the expectation that some infrastructure will be retained by the relevant State authorities post closure. The assignment of probabilities to this scenario reduces the closure provision by US$0.7 billion.
Appropriate sources on which to base the calculation of the discount rate. The discount rate by nature is subjective and therefore sensitivities are shown below for how the provision balance, which at 31 December 2022 was US$15.8 billion, would change if discounted at alternative discount rates.
There is significant estimation uncertainty in the calculation of the provision and cost estimates can vary in response to many factors including:
Changes to the relevant legal or local/national government requirements and any other commitments made to stakeholders;
Review of remediation and relinquishment options;
Additional remediation requirements identified during the rehabilitation;
The emergence of new restoration techniques;
Precipitation rates and climate change;
Change in the expected closure date; and
Change in the discount rate.
Experience gained at other mine or production sites may also change expected methods or costs of closure, although elements of the restoration and rehabilitation can be unique to each site. Generally, there is relatively limited restoration and rehabilitation activity and historical precedent elsewhere in the Group, or in the industry as a whole, against which to benchmark cost estimates.
The expected timing of expenditure can also change for other reasons, for example because of changes to expectations relating to ore reserves and mineral resources, production rates, renewal of operating licences or economic conditions.
Changes in closure estimates at the Group’s ongoing operations could result in a material adjustment to assets and liabilities in the next 12 months and would also impact the depreciation and the unwind of discount in future years.
Changes to closure cost estimates for closed operations, and changes to environmental cost estimates at any operation, could cause a material adjustment to the income statement and closure liability. We do not consider that there is significant risk of a change in estimates for these liabilities causing a material adjustment to the income statement in the next 12 months. Any new environmental incidents may require a material provision but cannot be predicted.
Project specific risks are embedded within the cash flows which are based on a central case estimate of closure activities assuming that the obligation is fulfilled by the Group. These cash flows are then discounted using a discount rate specific to the class of obligations.
Provisions of US$15,759 million (2021: US$14,542 million) for close-down and restoration costs and environmental clean-up obligations are based on risk-adjusted cash flows. We re-assessed the closure discount rate in the current year and continue to consider that real rate of 1.5%, applied prospectively since 30 September 2020, is the most appropriate rate to use. This assumption is based on the currency in which we plan to fund the closures and our expectation of long-term interest rate and exchange rate parity in the locations of our operations. Prior to 30 September 2020 and in recent years, the close-down and restoration costs and environmental clean-up obligations were discounted at a real rate of 2.0%. To illustrate the sensitivity of the provision to discounting, if the discount rate at 31 December 2022 were decreased to 1.0% then the provision would be US$1.5 billion higher, of which approximately US$1.4 billion would be capitalised within “Property, plant and equipment” at operating sites and US$0.1 billion would be charged to the income statement for non-operating and fully impaired sites. If the discount rate were increased to 3.0% then the provision would be US$3.0 billion lower, of which approximately US$2.7 billion would result in a decrease within “Property, plant and equipment” at operating sites and US$0.3 billion would be credited to the income statement for non-operating and fully impaired sites.
Impact of climate change on our business - Close-down, restoration and environmental cost
The underlying costs for closure have been estimated with varying degrees of precision based on a function of the age of the underlying asset and proximity to closure. For assets within ten years of closure, closure plans and cost estimates are supported by detailed studies which are refined as the closure date approaches. These closure studies consider climate change and plan for resilience to expected climate conditions with a particular focus on precipitation rates. For new developments, consideration of climate change and ultimate closure conditions are an important part of the approval process. For longer-lived assets, closure provisions are typically based on conceptual level studies that are refreshed at least every five years; these are evolving to incorporate greater consideration of forecast climate conditions at closure.
Closure cost composition as at 31 December
2022
US$m

2021
US$m
Decommissioning, decontamination and demolition3,386 3,343 
Closure and rehabilitation earthworks(a)
4,760 4,125 
Long-term water management costs(b)
1,092 967 
Post closure monitoring and maintenance1,846 1,676 
Indirect costs, owners' costs and contingency(c)
4,675 4,431 
Total15,759 14,542 
(a)A key component of earthworks rehabilitation involves re-landscaping the area disturbed by mining activities utilising largely diesel powered heavy mobile equipment. In developing low-carbon solutions for our mobile fleet, this may include electrification of the vehicles during the mine life. The forecast cash flows for the heavy mobile equipment in the closure cost estimate are based on existing fuel sources. The cost incurred during closure could reduce if these activities are powered by renewable energy.
(b)Long-term water management relates to the post-closure treatment of water due to acid rock drainage and other environmental commitments and is an area of research and development focus for our Closure team. The cost of this water processing can continue for many years after the bulk earthworks and demolition activities have completed and are therefore exposed to long-term climate change. This could materially affect rates of precipitation and therefore change the volume of water requiring processing. It is not currently possible to forecast accurately the impact this could have on the closure provision as some of our locations could experience drier conditions whereas others could experience greater rainfall. A further consideration relates to the alternative commercial use for the processed water, which could support ultimate transfer of these costs to a third party.
(c)Indirect costs, owners' costs and contingency include adjustments to the underlying cash flows to align the closure provision with a central-case estimate. This excludes allowances for quantitative estimation uncertainties, which are allocated to the underlying cost driver and presented within the respective cost categories above.
Geographic composition as at 31 December
2022
US$m

2021
US$m
Australia7,983 7,605 
USA4,680 4,057 
Canada1,730 1,662 
Rest of World1,366 1,218 
Total15,759 14,542 
The geographic composition of the closure provision shows that our closure obligations are largely in countries with established levels of regulation in respect of mine and site closure.