EX-99.3 4 rt5.htm Exhibit 99.3

Notice to ASX

Increase to Rio Tinto Coal Australia Mineral Resources and Ore Reserves

3 March 2016

Included in Rio Tinto’s annual Mineral Resources and Ore Reserves update, released to the market today as part of its 2015 Annual Report, are increases in Rio Tinto Coal Australia’s Mineral Resources and Ore Reserves in New South Wales and Queensland, Australia.

The updated Ore Reserves and Mineral Resources are reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, 2012 (JORC Code) and Australian Securities Exchange (ASX) Listing Rules. As such, the reported increases relating to six Rio Tinto Coal Australia sites require the additional supporting information set out in this release and its appendices.

A full update of Ore Reserves and Mineral Resources is provided in the 2015 Annual Report.

Total coal Ore Reserves for all deposits have increased by 397 million tonnes (Mt), from 2,106 Mt to 2,504 Mt. Increases in Ore Reserves include:

  • Hunter Valley Operations (HVO) Ore Reserves increased by 309 Mt, from 581 Mt to 890 Mt.
  • Hail Creek Ore Reserves increased by 127 Mt, from 126 Mt to 253 Mt.

Total Mineral Resources exclusive of Ore Reserves have increased by 1,376 Mt, from 5,429 Mt to 6,805 Mt. These increases to Mineral Resources include:

  • HVO Mineral Resources increased by 458 Mt, from 1,373 Mt to 1,831 Mt.
  • Warkworth Mineral Resources increased by 138 Mt, from 475 Mt to 613 Mt.
  • Hail Creek Mineral Resources increased by 419 Mt, from 172 Mt to 591 Mt.
  • Kestrel and Kestrel West Mineral Resources increased by 164 Mt, from 142 Mt to 306 Mt.
  • Winchester South Mineral Resources increased by 164 Mt, from 192 Mt to 356 Mt.

Mt Robert contains a maiden Mineral Resource estimate of 31 Mt.

The upgrades have resulted from a programme of orebody knowledge and strategic mine planning optimisation undertaken at Rio Tinto Coal Australia. They are based on a rigorous examination of all Rio Tinto Coal Australia leases that included:

  • Consolidating and analysing a large volume of new and legacy geology data sets for all sites.
  • Reinterpreting and standardising all of the New South Wales and Queensland geology models, employing an expanded range of available data sets.
  • Updating the strategic mine planning processes and tools used to estimate Ore Reserves.
  • Adopting more efficient Mineral Resource estimation methods.

These increases in Ore Reserves and Mineral Resources reflect a continuation of the work announced in 2014.

All Minerals Resources and Ore Reserves are quoted on a 100% basis. Rio Tinto’s interest as at 31 December 2015 is listed in the tables on pages 2 and 3. On 30 September 2015 Rio Tinto announced a restructure of Coal & Allied which included changes in Rio Tinto’s interests in Hunter Valley Operations and Warkworth. The restructure completed on 3 February 2016.

Page 1 of 10


 

Notice to ASX

Table 1 – Ore Reserves


Notes

(a) Type of mine: O/P = open pit, O/C = open cut, U/G = underground, D/O = dredging operation. (b) Coal type: SC: steam/thermal coal, MC: metallurgical/coking coal.

(c) For coal, the yield factors shown reflect the impact of further processing, where necessary, to provide marketable coal.

(d) Coals have been analysed on an “air dried” moisture basis in accordance with Australian Standards and gross calorific value and sulphur content are reported here on that basis. Marketable Reserves tonnages are reported on a product moisture basis.

(e) The completion of technical and economic studies has resulted in an increase in the Hail Creek Reserves tonnes. This work included the development of a new life of mine design and schedule.

(f) A re-optimisation of the Hunter Valley Operations Resource was undertaken during 2015, following completion of an updated Resource model. This work included the development of a new life of mine design and schedule and resulted in an increase in the Hunter Valley Operations Reserves tonnes.

(g) Following the Planning and Assessment Commission determination which approved the Mt Thorley Warkworth continuation projects, the current Warkworth mine design and Reserves were confirmed on 30 November 2015.

Page 2 of 10


 

 

Table 2 – Mineral Resources


Notes

(a) Likely mining method: O/P = open pit; O/C = open cut; U/G = underground; D/O = dredging operation. (b) Coal type: SC=steam/thermal coal, MC=metallurgical/coking coal.

(c) Rio Tinto reports coal Resources on an in situ moisture basis.

(d) Hail Creek, Hunter Valley Operations, Kestrel, Mount Robert, Warkworth and Winchester South have had material Resources changes since previous publication .. (e) The increase in Resources tonnes at Hail Creek follows the completion of a Pre-feasibility study.

(f) Resources tonnes increased at Hunter Valley Operations following technical and economic studies.

(g) Resources tonnes increased at Kestrel Coal following re-evaluation of the recoverable coal footprint for a potential underground development in addition to technical and economic studies. Kestrel West is now reported under Kestrel Coal.

(h) Mount Robert Resources are reported for the first time following technical and economic studies.

(i) Resources tonnes increased at Warkworth following re-evaluation of the recoverable coal footprint for a potential underground development.

(j) Resources tonnes increased at Winchester South following technical and economic studies.

Page 3 of 10


 

Notice to ASX

Summary of information to support the Mineral Resources estimates

Mineral Resource Estimate increases for Hail Creek, Hunter Valley Operations, Warkworth, Kestrel and Kestrel West, Winchester South and Mt Robert are supported by JORC Table 1 (Section 1 to 3) documents provided in Appendices 1 to 6 of this release and also located at www.riotinto.com/JORC.

An increase in Hail Creek Mineral Resources follows the completion of Pre-Feasibility level mining studies for opencast and underground deposits. Geology models supporting the Mineral Resource increase were updated to incorporate new and legacy drilling data and 3D seismic data, leading to revised interpretations of coal seam structure, yield and quality.

An increase in Hunter Valley Operations (HVO) Mineral Resources follows the completion of mining and strategic optimization studies for opencast and underground deposits. Geology models supporting the Mineral Resource increase were merged and updated to incorporate new and legacy drilling data, leading to revised interpretations of coal seam structure, yield and quality. This work was the continuation of work referred to in the 2014 HVO Mineral Resource increase.

An increase in Warkworth Mineral Resources follows the completion of mining studies for underground deposits. The Geology model supporting the Mineral Resource increase was updated to incorporate new and legacy drilling data, leading to revised interpretations of coal seam structure, yield and quality.

An increase in Kestrel and Kestrel West Mineral Resources follows the completion of integrated mining studies for underground deposits. Geology models supporting the Mineral Resource increase were merged and updated to incorporate new and legacy drilling data, leading to revised interpretations of coal seam structure, yield and quality. Kestrel West Mineral Resources are now reported under Kestrel Coal.

An increase in Winchester South Mineral Resources follows the completion of mining studies for opencast deposits. The Geology model supporting the Mineral Resource increase was updated to incorporate new and legacy drilling and 2D seismic data, leading to revised interpretations of coal seam structure, yield and quality.

Maiden reporting of Mt Robert Mineral Resources follows the completion of mining studies for opencast deposits. The geology model supporting the Mineral Resource estimate incorporates new and legacy drilling data.

Mineral Resource estimates for Hail Creek, HVO, Warkworth, Kestrel, Kestrel West and Mt Robert all employ consistent opencast and underground estimation methods and consistent economic inputs.

The following summary of information for Mineral Resource Estimates is provided in accordance with Chapter 5.8 of ASX Listing Rules.

Geology and geological interpretation

Hunter Valley Operations and Mount Thorley Warkworth (MTW) are located within the Sydney Basin of New South Wales (NSW), a world–class export thermal coal mining district. Hail Creek, Mt Robert, Winchester South, Kestrel and Kestrel West are located within the Bowen Basin of central Queensland, a world-class metallurgical coal mining district.

All of the NSW and Queensland Geology models contain comprehensive datasets and well defined interpretations for coal quality and geological structure, including coal seam continuity and faulting. Coal seam sub-crops, limits of oxidation and igneous intrusions are well defined for all deposits. All of the Geology models are supported by surface outcrop mapping, drilling and airborne geophysical data. In total, 6,058 holes are drilled into Hail Creek deposit, 9,557 holes are drilled into HVO deposits, 2,628

Page 4 of 10


 

holes are drilled into MTW deposit, 1,473 holes are drilled into Kestrel and Kestrel West deposits, 1,250 holes are drilled into Winchester South deposit and 1,107 holes are drilled into Mt Robert deposit.

The Hail Creek Geology model is also supported by 3D seismic surveying and opencast pit mapping and surveying data. The HVO and MTW Geology models are also supported by opencast pit mapping and surveying data. The Kestrel Geology model is also supported by underground panel mapping and surveying data. The Winchester South Geology model is also supported by 2D seismic surveying data.

Drilling techniques

For all NSW and Queensland deposits open hole drilling was the preferred method for delineating coal and waste structure. Core drilling, including 4C (100mm), HQ3 and PQ3 diameters was also completed for all deposits for the purpose of coal quality, geotechnical and gas characterization. Large diameter 8C (200mm) holes have also been drilled at Hail Creek, HVO, Kestrel and Winchester South for the purpose of characterizing coal quality and to support sizing studies. Downhole geophysical logging was completed for the majority of drill holes in all deposits, employing a comprehensive suite of down hole tools to collect calliper, gamma, density, neutron and sonic measurements. Acoustic scanner measurements were also routinely completed for cored holes to obtain additional data for geotechnical assessments.

Sampling, sub-sampling method and sample analysis method

For all NSW and Queensland deposits the sampling of drill core was completed according to a universal standard set of instructions. Samples were bagged at the drill site and then transported to an external accredited laboratory for analysis. All samples were weighed, air-dried and then re-weighed before being crushed to a nominal size. A rotary splitter was used to divide the sample into portions available for further analysis. For all deposits coal quality analysis was by a three-stage method comprising raw analysis for all plies followed by washability and product testing on composite samples. All sample treatment and analysis was conducted according to procedures which adhere to Australian or International equivalent standards in National Association of Testing Authorities certified laboratories.

Criteria used for classification

Rio Tinto Coal Australia employed a common methodology for classifying all NSW and Queensland Mineral Resources into inferred, measured and indicated confidence categories. Drill holes were assessed according to the value and reliability of contained data to contribute a point of observation to Mineral Resource classifications. Structure and coal quality confidence limits were plotted separately on a seam group basis with classification of coal inventory into areas of low, medium or high confidence. These were combined to delineate areas of Measured, Indicated and Inferred coal inventory as a basis for classifying Mineral Resource tonnage estimates.

Kestrel and Winchester South Mineral Resource estimates also employed findings of recent geostatistical studies to support classification limits.

For all NSW and Queensland deposits a range of drill hole spacing limits were identified to reflect the inherent variability of each seam group modelled within each structural domain of the deposit. Structure classifications correspond with typical drill hole spacing distances of 125m to 650m for high, 250m to 1,200m for medium and 750m to 3,000m for low confidence limits. Coal quality classifications correspond with typical drill hole spacing distances of 175m to 750m for high, 500m to 1,350m for medium and 1,200m to 3,000m for low confidence limits.

Estimation methodology

Geology models for all NSW and Queensland deposits were constructed on a consistent basis employing coal industry standard software. For structural modelling a Finite Element Method (FEM) interpolator was

Page 5 of 10


 

 

employed. For coal quality modelling an inverse distance squared interpolator was employed. All surfaces and coal qualities were interpolated into grids with 20-50 m2 node spacing. Modelling was completed on an iterative basis by checking cross sections and contours of structural and coal quality attributes. Database values were posted on contours to provide a further check. For all deposits a volume / tonnage check was completed with predecessor models to provide final validation.

Reasonable prospects for eventual economic extraction

Rio Tinto Coal Australia employed a standard approach for all NSW and Queensland deposits to identify Mineral Resource volumes with reasonable prospects for eventual economic extraction.

For Hail Creek, HVO, Winchester South and Mt Robert opencast deposits a minimum coal thickness of 0.2m and density of 1.8 g/m3 were applied as cut-off parameters for reporting Mineral Resources. Opencast resource volumes correspond with the limits of a “break even” ($0 margin) Lerchs-Grossman optimised shell. This method identifies the maximum depth or lowermost seam to be considered.

For Hail Creek, HVO, Warkworth, Kestrel and Kestrel West underground resources a minimum coal thickness of 1.8m and certain depth limits provide cut-off parameters for reporting Mineral Resources. Underground Mineral Resources correspond with practically mineable coal seam volumes employing longwall or board and pillar methods. Underground Mineral Resources must support longwall mining layouts with a break-even” or better economic result, including reasonable development capital costs.

 

 

 

 

 

Page 6 of 10

 


 

 

Summary of information to support the Ore Reserves estimates

An increase in Hail Creek Ore Reserves follows the completion of Pre-Feasibility level studies for opencast deposits.

Whilst at Hunter Valley Operations completion of Rio Tinto Coal Australia’s Rapid Resource Estimation (RRE) process and detailed strategic optimisation has led an increase to the previously reported Ore Reserves. In the case of Hunter Valley Operations, this work was the continuation of the work referred to in the 2014 Ore Reserve increase.

Ore Reserve Estimate upgrades for Hunter Valley Operations and Hail Creek are supported by JORC Table 1 (Section 4) documents provided in Appendices 1 and 3 of this release and located at www.riotinto.com/JORC. The following summary of information for Ore Reserve Estimates is provided in accordance with Chapter 5.9 of ASX Listing Rules.

Economic assumptions

Rio Tinto applies a common process to the generation of commodity price estimates (as an input into Ore Reserves) across the group. This involves generation of long-term price curves based on current sales contracts, industry capacity analysis, global commodity consumption and economic growth trends. In this process, a price curve rather than a single price point is used to develop estimates of mine returns over the life of the project. The detail of this process and of the price point curves is commercially sensitive and is not disclosed.

Criteria used for classification

For both deposits the stated Proved and Probable Ore Reserves directly coincide with the Measured and Indicated Mineral Resources, respectively. There are no Inferred or Unclassified resources included in the stated reserve numbers.

Mining and recovery factors

For both deposits mine design strips and blocks were applied to the in-situ coal resource model to generate the raw Reserves used to create a separate mine schedule database. The mine schedule database also reflects working sections or seam aggregations, mining methods and associated loss and dilution impacts. The mine schedule database was used as the basis for Ore Reserves reporting.

Both mines utilises dragline, truck and shovel for waste movement, while coal is loaded using a combination of loaders and excavators with haulage to the Run Of Mine (ROM) hopper undertaken using rear dump trucks. The operations are supported by additional equipment including dozers, graders and water carts.

All pit end-walls have benched and battered designs based on typical Rio Tinto Coal Australia practice with allowances made for increasing depth of mining. The design provides for mining roadways and catch benches.

Cut-off grades

Working section or seam aggregation logic pre-determines what is defined as mineable coal by applying working section tests based on minimum coal thickness of 30cms. Hunter valley Operations applies a post aggregation maximum ash test of 50% on an air-dried basis.

Page 7 of 10


 

 

Coal loss and dilution factors are also applied and vary by the equipment type uncovering the various coal seams (i.e. excavator/truck versus dragline). Typical roof and floor coal loss thickness ranges from 2cm–59cm. Typical roof and floor waste dilution thickness ranges from 3cm–16cm.

Processing

The processes used across the operating mines and projects are standard for the coal industry and so are well tested technologies. All samples were wash/cut-point tested and so the representativeness of test work undertaken is implicit in the Resource classification status.

In-seam dilution was included in sample testing.

Ore Reserve estimation was based on existing product specifications.

Modifying factors

Rio Tinto Coal Australia has an extensive environmental and heritage approval and compliance process. No issues are expected that would impact on the Mineral Reserve estimate. Mining operations, management of waste, and storage/discharge of any solids, liquids or gases, meet current environmental requirements. All necessary Government approvals are expected to be received within the timeframes anticipated in the life of mine (LOM) plan.

Hail Creek and Hunter Valley Operations are operating sites with existing infrastructure in place to support each operation. The current LOM requires sustaining capital only to maintain the existing infrastructure.

 

 

 

Page 8 of 10


 

 

Competent Persons Statement

The information in this report that relates to Mineral Resources is based on information compiled by Dr Richard Ruddock, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. Dr Ruddock is a full-time employee of the company.

The information in this report that relates to Ore Reserves for Hail Creek is based on information compiled by Mr Matthew Hillard, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Hillard is a full-time employee of the company.

The information in this report that relates to Ore Reserves for Hunter Valley Operations is based on information compiled by Mr Greg Doyle, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Doyle is a full-time employee of the company

Dr Ruddock, Mr Doyle and Mr Hillard have sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as Competent Persons as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Dr Ruddock, Mr Doyle and Mr Hillard consent to the inclusion in the report of the matters based on the information in the form and context in which it appears.’

 

 

 

 

 

 

 

 

 

Page 9 of 10


 

Contacts

media.enquiries@riotinto.com

www.riotinto.com

 

  Media Relations, EMEA/Americas  Media Relations, Australia/Asia 
  Illtud Harri  Ben Mitchell 
 

T +44 20 7781 1152 

T +61 3 9283 3620 

 

M +44 7920 503 600 

M +61 419 850 212 

 
  David Outhwaite  Bruce Tobin 
 

T +44 20 7781 1623 

T +61 3 9283 3612 

 

M +44 7787 597 493 

M +61 419 103 454 

 
  David Luff  Matthew Klar 
 

T +44 20 7781 1177 

T +61 7 3625 4244 

 

M +44 7780 226 422 

M +61 457 525 578 

 
  Investor Relations, EMEA/Americas  Investor Relations, Australia/Asia 
  John Smelt  Natalie Worley 
 

T +44 20 7781 1654 

T +61 3 9283 3063 

 

M +44 7879 642 675 

M +61 409 210 462 

 
  David Ovington  Rachel Storrs 
 

T +44 20 7781 2051 

T +61 3 9283 3628 

 

M +44 7920 010 978 

M +61 417 401 018 

 
  Grant Donald   
 

T +44 20 7781 1262 

 
 

M +44 7920 587 805 

 

 

  Rio Tinto plc  Rio Tinto Limited 
  6 St James’s Square  120 Collins Street 
  London SW1Y 4AD  Melbourne 3000 
  United Kingdom  Australia 
 
  T +44 20 7781 2000  T +61 3 9283 3333 
  Registered in England  Registered in Australia 
  No. 719885  ABN 96 004 458 404 

 

Page 10 of 10


 

Appendix 1

Hunter Valley Operations Table 1

The following table provides a summary of important assessment and reporting criteria used at Hunter Valley

Operations (HVO) for the reporting of exploration results, Mineral Resources and Ore Reserves in accordance with the Table 1 checklist in The Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition). Criteria in each section apply to all preceding and succeeding sections.

SECTION 1 SAMPLING TECHNIQUES AND DATA

Criteria 

Commentary 

Sampling techniques   

A combination of open hole (predominantly for structural definition) and cored (for coal 

   

quality (CQ), geotechnical and gas sampling) have been used. 

Drilling techniques   

A total of 9,557 drill holes (585,019m) support the Resource estimate. Cored drilling 

   

represents 34% of the total metres and open hole drilling 66%. The drill holes are up to 

   

616m in length and average 67m. The drill holes were all nominally recorded as 

   

vertical - boreholes which deviated by more than 5% from vertical of the total drill holes 

   

length the drill hole were redrilled. 

   

Coring has predominantly been done using a HQ3-sized (63mm) bit and open hole 

   

drilling to an equivalent hole diameter size. In addition a limited number of large 

   

diameter (LD) holes have been drilled: 103 holes at 101mm (4”) and six holes at 

   

200mm (8”) diameter sizes. 

Drill sample recovery   

Standardised Rio Tinto Coal Australia logging systems are utilised for all drilling, 

   

logging, and sampling. 

   

Core recovery is recorded by the geologist while logging the drill hole. If core recovery 

   

for a coal ply is less than 95%, then that section of the hole is redrilled to ensure a 

   

representative sample is taken. 

   

Ply samples are checked for representativeness using a theoretical mass that is 

   

determined using analysed relative density, sample thickness and core diameter prior 

   

to composite definition. 

   

Open hole chip recovery is assessed qualitatively by the rig geologist. 

Logging   

Core is geologically and geotechnically logged and open hole chip samples are taken 

   

every 1m and logged for lithology changes. Logging for lithology, grainsize, weathering 

   

and hardness is conducted using standard dictionary definitions. Colour and any 

   

additional qualitative comments are also recorded. 

   

All core is photographed on the core table (0.5m increment) and in 4m (HQ) or 5m 

   

(N/PQ) trays. Chip samples are photographed in 1m intervals. 

   

All holes are logged using a comprehensive suite of downhole geophysics tools 

   

(calliper, gamma, density, neutron, sonic) with acoustic scanner (for geotechnical 

   

assessment) also run on cored holes. 

Sub-sampling   

Core sampling is completed at the drill site and based on set of standard criteria 

techniques and   

(determined by lithology and structure). Samples are bagged at the drill site and then 

sample preparation   

transported to an external accredited laboratory for analysis as a complete hole batch. 

    All samples are weighed, air-dried and then re-weighed before being crushed to an 
    11.2mm top size. A rotary splitter is used to divide the sample into portions available for 
    further CQ analysis. 
    CQ analysis is by a three-stage method involving raw analysis on all plies followed by 
    washability and product testing on composite samples as defined by the geologist. 
    All sample treatment and analysis is conducted according to procedures which adhere to 
    Australian (or International equivalent) standards in a National Association of Testing 
    Authorities certified laboratory. 
Quality of assay data   

Non-formalised quality assurance/quality control (QAQC) involving duplicate samples is 

and laboratory tests   

completed and, in addition, Rio Tinto Coal Australia checks laboratory round robin and 

   

basic reproducibility tests provided by the primary laboratory. All results are assessed via 

   

cross-plots and statistics for precision and accuracy. 

 

Page 1 of 13


 

Verification of    All CQ sampling and analysis is overseen and checked by Rio Tinto personnel. 
sampling and    Data transfer from site is covered by an agreed protocol. This system documents 
assaying    primary data, data entry procedures, data verification, data storage (physical and 
    electronic) into a geological database. 
Location of data    The topographic surface is derived from a combination of Lands and Property 
points    Management Authority 10m contours which originated from the early 1980s, and 
    recent (September 2008) 2m contours derived from an airborne LiDAR survey. Drill 
    hole collars and mine survey data were also used. The digital terrain model was 
    created with a 50m × 50m cell size triangulation at 0.2m decimation. 
    All surveyed coordinates are within Map Grid of Australia 1994 MGA (MGA94) Zone 56 
    projection using datum GDA94. 
    Drill hole collars were surveyed post drilling by licensed surveyors using differential 
    global positioning system with an accuracy of ±10mm.
    Downhole surveying has been undertaken using downhole verticality and calliper tools 
    since 2007, including attempted resurvey of earlier drill holes. Overall 84% of the 
    diamond drilling metres have been surveyed downhole over the entire drill hole length 
    but only 40% of the total open hole drilling metres have been downhole surveyed. 
Data spacing and    Drill hole spacing for core holes is on an equilateral triangle grid of 500m or less. For 
distribution    open holes spacing is on a 250m or less equilateral triangle grid. 
    All core samples are composited within defined seam boundaries. 
Orientation of data in    The coal measures show a relatively consistent layering and are not subject to steep 
relation to geological    dips. The orientation of drilling is therefore suitable for flat lying stratified deposits. 
structure     
Sample security    Core/chip samples are taken at the drill site and then transported daily to the locked 
    HVO core shed for storage. Once the hole has been completed the samples are 
    transported to the laboratory via a dedicated courier service. 
Audits or reviews    HVO has had one audit completed in the past five years. The audit was conducted in 
    September 2011 by the Quantitative Group Pty Ltd (report: Rio Tinto Corporate 
    Assurance Resources and Reserves Internal Audit Report. Hunter Valley Operations. 
    2.1). 
    The review concluded that the fundamental data collection techniques are appropriate. 

 

SECTION 2 REPORTING OF EXPLORATION RESULTS

Criteria 

Commentary

Mineral tenement and    Tenements are 100% owned by Coal and Allied Industries Limited, which is in turn a
land tenure status    100% owned subsidiary of Rio Tinto Coal Australia.
    HVO contains numerous leases and licences (see Figure 1, note that this is schematic
    only):
    o  2 × authorisations covering 533ha 
    o  3 × consolidated coal leases covering 1782.5ha 
    o  5 × coal leases covering 247ha 
    o  1 × coal mining lease covering 2162ha 
    o  6 × exploration leases covering 5849ha 
    o  14 × mining leases covering 6924.47ha 
    o  5 × mining lease applications covering 251.96ha 
    o  1 × assessment lease application covering 430ha 
    All leases containing Resources are in good standing.

 

Page 2 of 13


 


Page 3 of 13


 

Exploration done by    HVO is an amalgamation of several previously independent mines: Howick, Hunter 
other parties   

Valley, and Lemington. Each mine was developed at different times resulting in 

   

variable exploration summarised as follows: 

   

o 

Howick open-cut (west pit) – exploration initiated in the 1940s and 1950s 
      undertaken by the Joint Coal Board and the Bureau of Mineral Resources. Drilling 
      to 200m–300m spacing for cored holes and 50m–150m spacing for open holes. 
   

o 

Hunter Valley No.1 & 2 mines – exploration initiated in the 1960s and early 1970s 

     

by the New South Wales (NSW) Department of Mines. Drilling to 212m spacing 

     

for cored holes and 100m spacing for open holes. 

   

o 

Lemington South open-cut and underground mines – exploration initiated in the 

     

1970s by the Joint Coal Board. Drilling to 200m– 800m spacing for cored holes. 

Geology    HVO is located in the Hunter Coalfield in the northern part of the Sydney Basin which 
   

contains numerous important coal producing intervals in the Permian stratigraphy. The 

   

Late Permian Wittingham Coal Measures are further sub-divided into the Vane sub- 

   

group (West and Mitchell Pits to the north of HVO) and the Jerrys Plains sub-group 

   

(Carrington, Cheshunt and Riverview Pits to the central and south parts of HVO). 

   

These sub-groups host the main coal deposits mined at HVO. The main rock types of 

   

these sub-groups are sandstone, siltstone and conglomerate, which occur with 

   

subordinate coal and tuffaceous claystone. 

Drill hole information    Drilling data summary since consolidation of the mines into one operation (as HVO): 
   
    Since the previous resources upgrade in 2014 there have been an additional 2,153 
    drillholes added due to 6 new holes drilled but mostly to a major legacy database 
    update 
Data aggregation    Ply samples are combined to create composites (for washability and product coal 
methods    analyses) representing mineable seam working sections. 
Relationship between    Based on drilling techniques and stratigraphy, the coal seam intercepts approximate 
mineralisation widths    the true coal thickness. 
and intercept lengths     

 

Page 4 of 13


 


Page 5 of 13


 


 

Page 6 of 13


 

Balanced reporting    Not applicable. Rio Tinto Coal Australia has not specifically released exploration 
    results for these deposits. 
Other substantive    In addition to drilling, resistivity surveys, ground and airborne magnetic surveys have 
exploration data    been completed to identify faults, dykes, and alluvial limits. 
Further work    Drilling for both pre-production and strategic brown/green fields drilling is ongoing and 
    analytical (CQ, geotechnical, gas) results will be ongoing.
    Greenfields exploration includes investigations in the Auckland and Southern areas. In 
    addition regional scale exploration and evaluation are being made to assess the 
    underground potential of HVO and the adjoining areas (Mount Thorley Warkworth 
    (MTW) directly south of HVO). 

 

Page 7 of 13


 

SECTION 3 ESTIMATION AND REPORTING OF MINERAL RESOURCES

Criteria 

Commentary 

Database integrity    All drill hole data are securely stored in a database which is duplicated on multiple servers 
    (HVO and Singleton) and is backed up daily. 
    Data are validated at the drill site and also prior to loading into the database by the 
    responsible geologist. 
    The database contains automated validation processes, during data loading and prevents 
    invalid data being loaded. 
Site visits    The Resources Competent Person visited HVO in 2015. 
Geological    The deposit is well known and tabular with all major structures and coal seam continuity 
interpretation    (including coal quality) and limits (i.e. LOX, sub-crop and igneous intrusions) defined. Infill 
    drilling, mining exposure and mapping have supported and refined the model. The 
    additional legacy data added has confirmed this and the current interpretation is thus 
    considered to be robust. 
Dimensions    The deposit trends 20km northwest to southeast and is 10km in width. The deposit 
    extends to a depth of 515m below the topographic surface.
Estimation and    Modelling was completed using resource modelling software. For structural modelling a 
modelling techniques    proprietary fine element method (FEM) interpolator is used and for CQ an inverse 
    distance squared interpolator is used. All surfaces and coal qualities are interpolated into 
    grids with 50m P 50m node spacing. 
    The model is of the coal seams only with waste modelled by default. Resource estimates 
    are therefore of the coal seams only and restricted on a whole seam group basis only. 
    Modelling is completed on an iterative basis by checking cross-sections and contours of 
    structural and CQ attributes. Database values are posted on contours as a further check. 
    A volume/tonnage check between the model and its predecessor are completed as a final 
    validation. 
    The previous resources upgrade in 2014 was based on two separate resource models 
    (north and south of the Hunter River) – these models have been merged for this update. 
    The underground estimates are based on a separate model which spans HVO south of 
    the Hunter River and the Mount Thorley Warkworth deposit directly adjacent to the south. 
    This model only considers the Vane sub-group. 
Moisture    All tonnages are estimated on an in situ moisture basis, which is determined as air-dried 
    moisture content plus 4%. 
    This number is derived using the assumption that the run of mine (ROM) and in situ 
    moisture are comparable. At HVO, the run of mine (ROM) moisture content is not well 
    understood due to the lack of sampling equipment on the feed to the coal handling and 
    preparation plant (CHPP). At MTW, which has such equipment, the ROM moisture is 
    typically 4% higher than the air-dried moisture content. Since the coals mined at HVO and 
    MTW are similar rank and largely from the same sequence, the same relationship is 
    assumed to be valid at HVO. 

 

Page 8 of 13


 

Cut-off parameters    Nominally coal is washed to produce a semi-soft coking coal product at 9% air-dried ash 
    or to three types of thermal products (11% air-dried ash, 13% air-dried ash and 18% air- 
    dried ash). For all products, product moisture is at 9%. Air-dried is quoted at a 2.5% 
    moisture basis. 
    A minimum coal thickness of 0.25m and density of 1.8 g/m3 are applied as cut-off 
    parameters for reporting coal. 
    Economic resources are defined by a “break even” ($0 margin) Lerchs-Grossman 
    optimised shell for opencast coal – this effectively sets the maximum depth or lowermost 
    seam considered. For underground resources the limits are based on either an order of 
    magnitude study or standard set of rules (i.e. coal below “break even” shell, less than 
    600m deep and greater than 1.8m thick). 
Mining factors or    Development of this Mineral Resource estimate assumes mining using standard 
assumptions    Rio Tinto Coal Australia equipment. The assumed mining method is overburden removal 
    via draglines, and conventional truck and shovel open-cut coal mining. 
    Mining practices utilise detailed extraction plans to effectively manage grade control. 
    These extraction plans are generated from real time blast hole drill compliance monitoring, 
    in-pit visual inspections and survey monitoring and control.
Metallurgical factors    A combination of density separation (magnetite/water) and fines flocculation processes 
or assumptions    are used for the processing of HVO coal. 
Environmental    Rio Tinto Coal Australia has an extensive environmental and heritage approval and 
factors or    compliance process. No issues are expected that would impact on the Mineral Resource 
assumptions    estimate. 
Bulk density    Certain boreholes samples have only true relative density (RD) analysis; some have both 
    apparent relative density (ARD) and true RD, and most have ARD. Relationships between 
    ARD and RD were determined from the paired sets of ARD and RD analyses. The 
    relationships used to populate the ply by ply data with missing ARDs or RDs are: RD(ad) 
    = 1.042 × ARD (ad) – 0.018. 
 
    The in situ relative density (i.e. the density of materials at an in situ moisture basis) is 
    calculated using the Preston and Sanders equation: 
 
   

              RD2= [RD1*(100-M1)]/ [100+RD1*(M2-M1)-M2] 
 

    Where RD1 is true RD (ad), M1 is moisture (ad) and M2 is the in situ moisture (M1 + 4). 
Classification    The classification of the Mineral Resources into varying confidence categories is based on 
    a standardised process of utilising points of observation (PoO). Drill holes are assessed 
    according to their reliability and value in estimation. The PoOs are used to categorise 
    structure and quality continuity. 
    Radii of influence are then plotted around PoO maps for structure and quality. The radii of 
    influence were determined by consideration of the observed variability in structure and CQ 
    for seam groups, and by examining histograms and statistics of ash content of seam 
    groups. As there are many plies at HVO, seam groups (equivalent to the seam names) 
    were used for categorisation. 
    Areas of confidence (low, medium, high) are produced from these plots (structure, CQ for 
    each seam group) and finally these are combined to produce areas of Measured, 
    Indicated and Inferred Resources which are used to subdivide the tonnage estimates. 
    In summary structural radii range 175-250m for high confidence, 350-500m for medium 
    and 1,400-2,000m for low; and, for CQ 450-500m radii for high, 900-1,000m for medium 
    and 2,700-3,000m for low confidence respectively. The ranges reflect variability within the 
    nineteen seam groups modelled at HVO. 
    The Competent Person is satisfied that the stated Mineral Resource classification reflects 
    the geological controls interpreted and the estimation constraints of the deposits. 
Audits or reviews    In September 2011 an audit into the modelling and Resource estimation process at HVO 

 

Page 9 of 13


 

   

was completed (report: Rio Tinto Corporate Assurance Resources and Reserves Internal 

   

Audit Report. Hunter Valley Operations. 2.1). 

   

The outcome of this audit was overall a satisfactory rating with a number of 

   

recommendations made and acted upon by Rio Tinto Coal Australia. 

Discussion of relative   

Rio Tinto Coal Australia operates multiple mines in NSW and Queensland. The Mineral 

accuracy/ confidence   

Resource data collection and estimation techniques used for the HVO deposit are 

   

consistent with those applied at other deposits which are being mined. 

   

Reconciliation of actual production with the Mineral Resource estimates for the existing 

   

operational deposits are generally within 3% for tonnes. This result is indicative of a robust 

   

process. 

   

Accuracy and confidence of Mineral Resource estimate has been accepted by the 

   

Competent Person. 

SECTION 4 ESTIMATION AND REPORTING OF ORE RESERVES 

Criteria 

Commentary 

Mineral Resource    A 3D gridded Resource model of topography, structure and quality are used for in situ 
estimate for    Resource definition. 
conversion to Ore    Mine design strips and blocks are applied to the in situ Resource model to generate the 
Reserves    raw Reserves used to create a separate mine schedule database. The mine schedule 
    database also reflects working sections or seam aggregations, mining methods and 
    associated loss and dilution impacts. The mine schedule database is used as the basis 
    for Ore Reserves reporting. 
    Mineral Resources are exclusive of Ore Reserves. Declared Ore reserves are for the 
    open pit operation only. 
Site visits    The Reserves Competent Person visited HVO in 2015. 
Study status    HVO is an operating mine project. The reportable Ore Reserve is based on the life of 
    mine (LOM) plan and has determined a mine plan that is technically achievable and 
    economically viable, and that material modifying factors have been considered. 
Cut-off parameters    Periodic (<3yrs) pit optimisation work used to define pit shells is conducted using 
    Rio Tinto economics prices and an estimate of unit operating costs including a $/ROMt 
    allowance for sustaining capex. This process was conducted in 2015 and led to the 
    inclusion of additional pits in the LOM plan and ultimately additional reserves. 
    For annual JORC Reserves reporting purposes, detailed mine design and schedules are 
    constructed to generate detailed cash flow schedules. This work includes identifying the 
    mining sequence, equipment requirements, and incremental and sustaining capital. 
    A discounted cashflow analysis is conducted to re-assess under the latest economic 
    assumptions the potential Reserves that remain net cashflow positive. 

 

Page 10 of 13


 

Mining factors or    The HVO mine utilises dragline, and truck and shovel for waste movement, while coal is 
assumptions    loaded using a combination of loaders and excavators with haulage to the ROM hopper 
    undertaken using rear dump trucks. The operations are supported by additional 
    equipment including dozers, graders, and water carts. 
    All pit end walls have benched and battered designs based on the existing operation with 
    allowances made for increasing depth of mining. The design provides for mining 
    roadways and catch benches. 
    Working section or seam aggregation logic pre-determines what is defined as mineable 
    coal by applying working section tests based on minimum coal thickness of 30cm, and a 
    maximum raw ash of 50% on an air-dried basis. 
    Coal loss and dilution factors are also applied and vary by the equipment type uncovering 
    the various coal seams (i.e. excavator/truck versus dragline). Typical roof and floor coal 
    loss thickness ranges from 5cm–25cm. Typical roof and floor waste dilution thickness 
    ranges from 3cm–7cm. 
    LOM plans for strategic planning purposes may contain Inferred Resources, provided that 
    the LOM plan would not be compromised by non-inclusion of this coal. Inferred 
    Resources included in LOM plans retain this designation and are not referred to as 
    Reserves. Neither are they reported in either JORC or Securities and Exchange 
    Commission compliant reserve statements. 
    The HVO LOM valuation has been tested removing the inferred and unclassified coal 
    from the schedule to ensure they still remain compliant. 
Metallurgical factors    HVO has three CHPPs: Hunter Valley CHPP, West Pit CHPP and the Newdell CHPP. 
or assumptions    Only Hunter Valley CHPP and West Pit CHPP are operational, with Newdell CHPP used 
    purely as a coal handling plant and no longer used to wash coal. 
    The processes used are standard for the coal industry and so are well tested 
    technologies. 
    All samples are wash/cut-point tested and so the representativeness of test work 
    undertaken is implicit in the Resource classification status. 
    In-seam dilution is included in sample testing. 
    Detailed reconciliation during the course of 2015 updated predicted yield. The updated 
    yield was validated against operating perofmance. 
    Ore Reserve estimation is based on existing product specifications. 
Environmental    HVO has a large number of current mining and exploration titles. 
    All the various mining leases across HVO are defined by a 21 year consent limit. This 
    consent limit is particular to each mining lease, and as such leases are constantly being 
    renewed. There is a dedicated tenements manager to ensure the application for lease 
    renewal occurs on time. All necessary Government approvals are expected to be 
    received within the timeframes anticipated in the LOM plan.
    Coarse rejects are dumped within the mine overburden dumps, while the fines coal 
    washery rejects are stored within dedicated tailings dams. Rejects material and 
    completed tailings dams must be covered by at least 3m of inert waste rock material. 
    Overburden waste rock has low acid forming potential. 
Infrastructure    HVO is an operating site with existing infrastructure in place to support the operation. The 
    current LOM requires sustaining capital only to maintain the existing infrastructure. 

 

Page 11 of 13


 

Costs    Based on detailed annual operating plan (AOP) process. Beyond AOP, sustaining capex 
    based on $/ROMt plus equipment replacements and additions required to deliver the 
    mine plan. 
    First principles estimating and aligned with AOP. Budget prices for major consumables 
    and labour. 
    Adjustments are made for energy. 
    Commodity prices are supplied by Rio Tinto Economics and Markets Team (RTEM), 
    based on: expected demand, current supply, known expansions, and expected 
    incentivised supply. 
    Exchange rates are supplied by RTEM. 
    Transport charges are obtained from coal chain team based on existing contracts and 
    expected tonnages. 
    State Government royalties, based on current NSW royalty rates. 
    Additional Reserves were added due to an improved operational cost focus, leading to a 
    demonstrated reduction in unit cost over 2013-2015 periods. Incorporation of legacy data 
    into the underlying geological model improved classifications leading to additional 
    reserves. 
Revenue factors    Rio Tinto applies a common process to the generation of commodity pricesestimatesheacross the 
    group. This involves generation of long-term price curves based on current sales 
    contracts, industry capacity analysis, global commodity consumption and economic 
    growth trends. In this process, a price curve rather than a single price point is used to 
    develop estimates of mine returns over the life of the project. The detail of this process 
    and of the price point curves is commercially sensitive and is not disclosed. 
Market assessment    The supply and demand situation for coal is affected by a wide range of factors, and coal 
    consumption changes with economic development and circumstances. Rio Tinto Coal 
    Australia delivers products aligned with its Mineral Resources and Ore Reserves, these 
    products have changed over time and successfully competed with coal products supplied 
    by other companies. 
Economic    Economic inputs such as foreign exchange rates, carbon pricing, and inflation rates are 
    also generated internally at Rio Tinto. The detail of this process is commercially sensitive 
    and is not disclosed. 
Social    A small parcel of reserves has been omitted due to the HVO South Aboriginal Cultural 
    Heritage Restricted Access Area 2. This area was been removed from the reserve 
    schedule valuation. 
    Rio Tinto Coal Australia established the Upper Hunter Valley Cultural Heritage Working 
    Group as a consultation and management process to negotiate cultural heritage issues 
    with local Aboriginal communities. As part of releasing a ground disturbance permit on 
    site, authority must be gained to destroy/remove sites of cultural interest. This involves 
    archaeological mapping and removal of artefacts prior to ground disturbance. 
    There are no sites of European cultural heritage at HVO. 
Other    Semi-quantitative risk assessments have been undertaken throughout the LOM and 
    Reserve phases. No material naturally occurring risks have been identified through the 
    above mentioned risk management processes. 
Classification    The Ore Reserves consist of 77% Proved Reserves and 23% Probable Reserves, this is 
    an increase in proven reserves from 67% Proved in 2014. 
    The Competent Person is satisfied that the stated Ore Reserve classification reflects the 
    outcome of technical and economic studies. 

 

Page 12 of 13


 

Audits or reviews    HVO has had one audit completed in the past five years. The audit was conducted in 
    September 2011 by the Quantative Group Pty Ltd (report: Rio Tinto Corporate Assurance 
    Resources and Reserves Internal Audit Report. Hunter Valley Operations. 2.1). The 
    review concluded that the fundamental data collection techniques are appropriate and 
    consistent with previously audited HVO models. 
Discussion of relative    Rio Tinto Coal Australia operates multiple mines in Queensland and New South Wales. 
accuracy/ confidence    The Ore Reserve estimation techniques utilised for HVO are consistent with those applied 
    across the other operations. Reconciliation of actual production with the Ore Reserve 
    estimate for the existing operations is generally within 5% for tonnage and grade. This 
    result is indicative of a robust Ore Reserve estimation process.
    Accuracy and confidence of modifying factors are generally consistent with the current 
    operation. 

 

 

 

 

 

 

 

 

 

 

 

Page 13 of 13


 

Appendix 2

Mount Thorley Warkworth Table 1

The following table provides a summary of important assessment and reporting criteria used at Mt Thorley Warkworth (MTW) for the reporting of exploration results, Mineral Resources and Ore Reserves in accordance with the Table 1 checklist in The Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition). Criteria in each section apply to all preceding and succeeding sections.

SECTION 1 SAMPLING TECHNIQUES AND DATA

Criteria  Commentary 
Sampling techniques    A combination of open hole (predominantly for structural definition) and cored (for coal 
    quality (CQ), geotechnical and gas sampling) have been used.
Drilling techniques    A total of 2,628 drill holes (274,585m) support the Resource estimate Cored drilling 
    represents 45% of the total metres and open hole drilling 55%. The drill holes are up to 
    725m in length and average 92m. The drill holes were all nominally recorded as vertical, 
    boreholes deviated by more than 5% were to be re-drilled by contractor. 
    Coring has predominantly been done using a HQ3-sized (63mm) and open hole drilling to 
    an equivalent hole diameter size. In addition a limited number of large diameter (LD) holes 
    have been drilled: seven holes at 150mm (6”) and 49 holes at 200mm (8”) diameter sizes. 
Drill sample recovery    Standardised Rio Tinto Coal Australia logging systems are utilised for all drilling logging 
    and sampling. 
    Core recovery is recorded by the geologist while logging the drill hole. If core recovery for 
    a coal ply is less than 95%, then that section of the hole is redrilled to ensure a 
    representative sample is taken. 
    Ply samples are checked for representativeness against a theoretical mass after raw CQ 
    analysis and prior to composite definition. 
    Open hole chip recovery is assessed qualitatively by the rig geologist. 
Logging    Core is geologically and geotechnically logged and open hole chip samples are taken every 
    1m and logged for lithology changes. Logging for lithology, grainsize, weathering and 
    hardness is conducted using standard dictionary definitions. Colour and any additional 
    qualitative comments are also recorded. 
    All core is photographed on both a core table (0.5m increment) and a 5m tray basis. Chips 
    are photographed as laid out by 1m intervals. 
    All holes are logged using a comprehensive suite of downhole geophysics tools (calliper, 
    gamma, density, neutron, and sonic) – with the addition of acoustic scanner that is used 
    for geotechnical assessment in cored holes 
Sub-sampling    Core sampling is completed at the drill site and based on set of standard criteria 
techniques and    (determined by lithology and structure). Samples are bagged at the drill site and then 
sample preparation    transported to an external accredited laboratory for analysis as a complete hole batch. 
    Prior to May 2013 samples were analysed by Australian Laboratory Services Steel River, 
    Newcastle laboratory. 
    All samples are weighed, air-dried and then re-weighed before being crushed to an 
    11.2mm top size. A rotary splitter is used to divide the sample into portions available for 
    further CQ analysis. 
    CQ analysis is by a three stage method involving raw analysis on all plies followed by 
    washability and product testing on composite samples as defined by the geologist. 
    All sample treatment and analysis is conducted according to procedures which adhere to 
    Australian (or International equivalent) standards in a National Association of Testing 
    Authorities certified laboratory. 
Quality of assay data    Non-formalised quality assurance/quality control (QAQC) involving duplicate samples is 
and laboratory tests    completed and, in addition, Rio Tinto Coal Australia checks laboratory round robin and 
    basic reproducibility tests provided by Bureau Veritas. All results are assessed via cross- 
    plots and statistics for precision and accuracy. 
Verification of    All CQ sampling and analysis is overseen and checked by other Rio Tinto personnel. 
sampling and    Data transfer from site is covered by an agreed protocol. This system documents primary 
    assaying data, data entry procedures, data verification, and data storage (physical and 

 

1


 

    electronic) into Ventyx/Mincom’s geological database 
Location of data    The topographic surface is derived from a combination of2m and 5m contour data digitised 
points    from topographic maps and 10m digitised data from the Bulga 1st edition topographic map 
    covering the mined areas. Drill hole collars and mine survey data were also used. The 
    digital terrain model was created with a 20m ™ 20m cell size triangulation at 0.2m 
    decimation. 
    All surveyed coordinates are within Map Grid of Australia 1994 MGA Zone 56. 
    Drill hole collars were surveyed post drilling by licensed surveyors using differential global 
    positioning system with an accuracy of ±10mm. 
    Downhole surveying has been undertaken using downhole verticality and calliper tools 
    since 2007, including attempted resurvey of earlier drill holes. Overall 84% of the diamond 
    drilling metres have been surveyed downhole over the entire drill hole length but only 
    40% of the total open hole drilling metres have been downhole surveyed. 
Data spacing and    Drill hole spacing for core holes is on an equilateral triangle grid of 250m or less. For open 
distribution    holes spacing is on a 125m or less equilateral triangle grid. 
    All core samples are composited within defined seam boundaries. 
Orientation of data in    The coal measures show a relatively consistent layering and are not subject to steep dips. 
relation to geological    The orientation of drilling is therefore suitable for flat lying stratified deposits. 
structure     
Sample security    Core/chip samples are taken at the drill site and then transported daily to the locked MTW 
    core shed for storage. Once the hole has been completed the samples are stored in a 
    refrigerated unit prior to being transported to the laboratory via a dedicated courier 
    service. 
Audits or reviews    MTW has had one audit completed in the past five years. The audit was conducted in 
    March 2010 by the Xstract Group (report: Resources and Reserves Internal Audit Report 
    Executive Summary Mt Thorley Warkworth).The review concluded that the fundamental 
    data collection techniques are appropriate. 

SECTION 2 REPORTING OF EXPLORATION RESULTS

Criteria  Commentary 
Mineral tenement and    MTW is an amalgamation of two previously independent mines – Mt Thorley Operations 
land tenure status    and Warkworth Mining Limited. Each mine was developed at approximately the same time 
    and combined by Coal & Allied Limited (CNA) in 2004. 
    MTW is operated by CNA on behalf of the joint venture (JV) participants. There are two JV 
    partnerships – one for each of the formerly separate operations. Participants in the JVs 
    are outlined below. 
    Mount Thorley Operations (MTO) 
    o  Mount Thorley Operations Pty Ltd (a subsidiary of CNA) (share: 80%) 
    o  Posco Australia Pty Ltd (share: 20%). 
    Warkworth Mining Limited (WML): 
    o  CNA Resources (a subsidiary of CNA) (share: 28.750%) 
    o  CNA Warkworth Australasia Pty Ltd (a subsidiary of CNA) (share: 26.824%) 
    o  Mitsubishi Development Pty Ltd (share: 28.898%) 
    o  Mitsubishi Materials (Australia) Pty Ltd (share: 6.000%) 
    o  Nippon Steel (Australia) Pty Ltd (share: 9.528%). 
    MTW contains numerous leases and licences including: 
    o  one consolidated coal lease covering 4192ha 
    o  one coal lease covering 1992ha 
    o  one exploration licence covering 1988ha 
    o  three mining leases covering 29ha 
    o  two mining lease applications covering 1370ha 
    All leases containing Resources are in good Standing. 

 

2


 

Exploration done by    1949–1950: Newly formed Joint Coal Board commence drilling shallow percussion 
other parties    boreholes (McMenamins and JCB Warkworth series). 
    1960s: Clutha Bargo explored the Whybrow Seam for coking coal potential. 
    Early 1970s: Armco conducted diamond drilling in the Bulga area. 
    1970-1975: Department of Mines conducts fully cored hole drilling programme (DM 
    Warkworth and DM Doyles Creek series). 
    1976: Warkworth Consortium is formed (later established as WML) and awarded mining 
    bid for Warkworth area. Commenced exploration programme with 12 rigs drilling fully 
    cored, HQ-size holes and large diameter (LD) core drilling in selected seams. 
    1976: Drilling programme started at Mt Thorley site – similar to Warkworth drilling 
    programme. Main concentration of drilling was in the shallower, eastern parts of the lease. 
    1980s & 990s: Main focus at Warkworth was open-hole drilling. Mt Thorley increased open 
    holing with production, and a concerted effort at core drilling during the 1990s. 

 

3


 

    2002–2005: Little drilling was undertaken. 
    2006–2014: Pre-production and further exploration drilling was undertaken. Focus was on: 
    improving borehole data density, testing in situ gas content, provide data for underground 
    Resources, testing the geology of Abbey Green, and extending pre-production drilling 3yrs 
    ahead of mining (MTO and WML). 
    Drilling completed on both sites has been combined into a single geological database. 
Geology    MTW is located in the Hunter Coalfield in the northern part of the Sydney Basin which 
    contains numerous important coal producing intervals in the Permian stratigraphy of the 
    Vane subgroup. The main rock types of this subgroup include sandstone, siltstone and 
    conglomerate, which occur with subordinate coal and tuffaceous claystone. 
Drill hole information    Drilling data summary since consolidation of the mines into one operation (as MTW): 
   
 

 

Since the previous resources upgrade in 2012 there have been an additional 422 

   

drillholes added due to new drilling or database updates 

Data aggregation 

 

Ply samples are combined to create composites (for washability and product coal 
methods    analyses) representing mineable seam working sections. 
Relationship between 

 

Based on drilling techniques and stratigraphy, the coal seam intercepts therefore 
mineralisation widths    approximate the true coal thickness. 
and intercept lengths     
Diagrams     

 

4


 


 

5


 


6


 


 

7


 


 

8


 

Balanced reporting    Not applicable. Rio Tinto Coal Australia has not specifically released exploration results for 
    these deposits. 
Other substantive    In addition to drilling, resistivity surveys, ground and airborne magnetic and 2D seismic 
exploration data    surveys have been completed to identify faults, dykes, and alluvial limits. 
Further work    Both pre-production drilling and strategic brownfields drilling is ongoing, and analytical 
    (CQ, geotechnical, and gas) results will be ongoing. 
    Brownfields exploration includes the MTW underground conceptual study. This covers the 
    areas of the present open-cut pits and to the western extents of the licences shown in 
    Figure 4: MTW open-cut operations. 

SECTION 3 ESTIMATION AND REPORTING OF MINERAL RESOURCES 

 
Criteria  Commentary 
Database integrity    All drill hole data is securely stored in a database which is duplicated on multiple servers 
    (MTW and Singleton) and is backed up daily. 
    Data is validated at the drill site and also prior to loading into the database by the 
    responsible geologist. 
    The database contains automated validation processes which are activated during data 
    loading and prevent un-validated data being loaded. 
Site visits    The Resources Competent Person visited MTW in 2015. 
Geological    The deposit is well known and tabular (layer-cake) with all major structures defined. Infill 
interpretation    drilling and mining exposure and mapping has supported and refined the model. The 
    current interpretation is thus considered to be robust. 
Dimensions    The deposit trends 8km northwest to southeast and is 8.5km in width. The deposit extends 
    to a depth of 460m below the topographic surface. 
Estimation and    Modelling was undertaken using resource modelling software (version 5.9). For structural 
modelling techniques    modelling a proprietary fine element method (FEM) interpolator is used and for CQ an 
    inverse distance squared interpolator is used. All surfaces and coal qualities are 
    interpolated into grids with 20m P 20m node spacing. 
    The model consists of the coal seams only with waste modelled by default. Resource 
    estimates are therefore of the coal seams only and restricted on a whole seam group basis 
    only. 
    Modelling is completed on an iterative basis with checking of cross sections and contours 
    of structural and CQ attributes. Database values are posted on contours as a further 
    check. A volume/tonnage check between the model and its predecessor are completed as 
    a final validation. 
    The underground estimates for the Vane sub-group are based on a separate model which 
    spans MTW and HVO south of the Hunter River and directly adjacent to the north. 
    Previous/existing underground resource estimates at MTW had been confined to the 
    Jerrys Plains sub-group. 
Moisture    All tonnages are estimated on an in situ moisture basis, which is determined as air-dried 
    moisture content plus 4%. This offset was derived by comparing the difference between 
    the average total moisture content of shipments of coal that have by-passed the coal 
    plant, and the average air-dried moisture content of that coal.
Cut-off parameters    Nominally coal is washed to produce an export thermal product (11%–15% air-dried ash), 
    a domestic thermal product (25% air-dried ash) and a semi-soft coking coal product at 
    9.0% air-dried ash. For all products, product moisture is at 9%. Air-dried is quoted at a 
    2.5% moisture basis. 
    A minimum coal thickness of 0.25m and density of 1.8 g/m3 are applied as a cut-off 
    parameters for reporting coal. 
    Economic resources are defined by a “break even” ($0 margin) Lerchs-Grossman 
    optimised shell for opencast coal – this effectively sets the maximum depth or lowermost 

 

9


 

    seam considered. For underground resources the limits are based on either an order of 
    magnitude study or standard set of rules (i.e. coal below “break even” shell, less than 
    600m deep and greater than 1.8m thick). 
Mining factors or    Development of this Mineral Resource estimate assumes mining using standard 
assumptions    Rio Tinto Coal Australia equipment. The assumed mining method is overburden removal 
    via draglines, and conventional truck and shovel open pit coal mining. 
    Mining practices utilise detailed extraction plans to effectively manage grade control. 
    These extraction plans are generated from real time blast hole drill compliance 
    monitoring, in pit visual inspections, and survey monitoring and control. 
    Conceptual underground mining will be by longwall methods. 
Metallurgical factors    It is assumed that a combination of density separation (magnetite/water) and fines 
or assumptions    flocculation processes used by Rio Tinto Coal Australia will be applicable for the 
    processing of MTW coal. 
Environmental factors    Rio Tinto Coal Australia has an extensive environmental and heritage approval and 
or assumptions    compliance process. No issues are expected that would impact on the Mineral Resource 
    estimate. 
Bulk density    Certain boreholes samples have only true relative density (RD) analysis; some have both 
    apparent relative density (ARD) and true RD, and most have ARD. Relationships between 
    ARD and RD were determined from the paired sets of ARD and RD analyses. The 
    relationships used to populate the ply by ply data with missing ARDs or RDs are: 
   

          RD (ad) = 1.0003 x ARD 1.0645, and ARD = 1.0045 x RD 0.9316. 

    The in situ relative density (i.e. the density of materials at an in situ moisture basis) was 
    calculated using the Preston and Sanders equation: 
   

          RD2=[RD1*(100-M1)]/[100+RD1*(M2-M1)-M2] 

    Where RD1 is true RD (ad), M1 is moisture (ad) and M2 is the in situ moisture.(M1 +4) 
Classification    The classification of the Mineral Resources into varying confidence categories is based on 
    a standardised process of utilising points of observation (PoO) (i.e. drill holes) according to 
    their reliability and value in estimation. The PoO are used to categorise structure and 
    quality continuity (or both) or support continuity. 
    Radii of influence are then plotted around PoO maps for structure and quality. The radii of 
    influence were determined by consideration of the perceived and observed variability in 
    structure and CQ for seam groups, and by examining histograms and statistics of ash 
    content of seam groups. As there are many plies at MTW, seam groups (equivalent to the 
    seam names) were used for categorisation. 
    Areas of confidence (low, medium, high) are produced from these plots (structure, CQ for 
    each seam group) and these are finally combined to produce areas of Measured, Indicated 
    and Inferred which are used to subdivide the Resource tonnage estimates. 
    In summary structural radii range 150-250m for high confidence, 300-500m for medium 
    and 1,200-2,000m for low; and, for CQ 300-500m radii for high, 600-1,000m for medium 
    and 1,800-3,000m for low confidence respectively. The ranges reflect variability within 
    the fifteen seam groups modelled at MTW. 
    The Competent Person is satisfied that the stated Mineral Resource classification reflects 
    the geological controls interpreted and the estimation constraints of the deposits. 
Audits or reviews    MTW has had one audit completed in the past five years. The audit was conducted in 
    March 2010 by the Xstract Group (report: Resources and Reserves Internal Audit Report 
    Executive Summary Mt Thorley Warkworth). 
    The outcome of this audit was overall a satisfactory rating with a number of 
    recommendations made and acted upon by Rio Tinto Coal Australia. 
Discussion of relative    Rio Tinto Coal Australia operate multiple mines in New South Wales (NSW) and 
accuracy/ confidence    Queensland (QLD). The Mineral Resource data collection and estimation techniques used 
    for the MTW deposit are consistent with those applied at other deposits which are being 
    mined. 
    Reconciliation of actual production with the Mineral Resource estimates for the existing 
    operational deposits are generally within 4% for tonnes, however grade is not reconciled 
    against. This result is indicative of a robust process. 
    Accuracy and confidence of Mineral Resource estimation estimate has been accepted by 

 

10


 

    the Competent Person. 
 

SECTION 4 ESTIMATION AND REPORTING OF ORE RESERVES 

 
Criteria  Commentary 
Mineral Resource    A 3D gridded Resource model of topography, structure, and quality are used for in situ 
estimate for    Resource definition. 
conversion to Ore    Mine design strips and blocks are applied to the in situ Resource model to generate the 
Reserves    raw reserves used to create a separate mine schedule database. The mine schedule 
    database also reflects working sections or seam aggregations, mining methods and 
    associated loss and dilution impacts. The mine schedule database is used as the basis for 
    Coal Reserves reporting. 
    Coal Resources are in addition to Coal Reserves. Open pit ore reserves are as reported in 
    2014, with an adjustment for mining depletion. 
Site visits    The Reserves Competent Person visited Mount Thorley Warkworth in 2015. 
Study status    MTW is an operating mine project. The reportable Ore Reserve is based on the life of mine 
    (LOM) plan and has determined a mine plan that is technically achievable and 
    economically viable, and that material modifying factors have been considered. 
Cut-off parameters    Periodic pit optimisation work used to define pit shells is conducted using Rio Tinto 
    economics prices and an estimate of unit operating costs and including a $/ROMt 
    allowance for sustaining capex. This process was conducted in 2015 at a long-term 
    consensus view of the thermal coal price of US$92.00/t. 
    For annual JORC reserves reporting purposes, detailed mine design and schedules are 
    constructed to generate detailed cash flow schedules. This work includes identifying the 
    mining sequence, equipment requirements, incremental and sustaining capital. 
    A discounted cashflow analysis is conducted to re-assess under the latest economic 
    assumptions the potential reserves that remain net cashflow positive. 
Mining factors or    The MTW mine utilises dragline, truck and shovel for waste movement, while coal is 
assumptions    loaded using a combination of loaders and excavators. Haulage to the ROM hopper is 
    undertaken using rear dump trucks. The operations are supported by additional 
    equipment including dozers, graders, and water carts. 
    All pit end-walls have benched and battered designs based on the existing operation with 
    allowances made for increasing depth of mining. The design provides for mining roadways 
    and catch benches. 
    Working section or seam aggregation logic pre-determines what is defined as mineable 
    coal by applying working section tests based on minimum coal thickness of 25cm, and a 
    maximum raw ash of 55% on an air-dried basis. 
    Coal loss and dilution factors are also applied and vary by the equipment type uncovering 
    the various coal seams (excavator/truck versus dragline). Typical roof and floor coal loss 
    thickness ranges from 8cm–25cm. Typical roof and floor waste dilution thickness ranges 
    from 4cm–13cm. 
    LOMs for strategic planning purposes may contain Inferred Resources, provided that the 
    LOM plan would not be compromised by non-inclusion of this coal. Inferred Resources 
    included in LOM plans retain this designation and are not to be referred to as Reserves. 
    Neither are they to be reported in JORC or Securities and Exchange Commission compliant 
    Reserve statements. 
    MTW has 10.5% Inferred coal within the existing LOM plan. 
Metallurgical factors    MTW has two coal handling and preparation plants (CHPP): North CHPP and South CHPP. 
or assumptions    Both plants are operational, with North CHPP is a single product washing and South CHPP 
    is capable of two-product washing. 
    The processes used are standard for the coal industry and so are well tested technologies. 
    All samples are wash/cut-point tested and so the representativeness of test work 

 

11


 

    undertaken is implicit in the resource classification status. 
    In-seam dilution is included in sample testing. 
    Coal Reserve estimation is based on existing product specifications. 
Environmental    MTW has a number of current mining and exploration titles. 
    All the various mining leases across MTW are defined by a 21yr consent limit. This consent 
    limit is particular to each mining lease, and as such leases are constantly being renewed. 
    There is a dedicated tenements manager to ensure the application for lease renewal 
    occurs on time. 
    An appeal of the project approval for Reserves west of Wallaby Scrub Road was upheld 
    (disapproved) by the NSW Land and Environment Court in April 2013. A 350m 
    modification within this area was subsequently secured in January 2014 and Rio Tinto Coal 
    Australia management worked through a process that resulted in further approvals being 
    granted in November 2015. 
    Coarse rejects are dumped within the mines overburden dumps, while the fines coal 
    washery rejects are stored within dedicated tailings dams. Rejects material and completed 
    tailings dams must be covered by at least 3m of inert waste rock material. 
    Overburden waste rock has low acid forming potential. 
Infrastructure    MTW is an operating site with existing infrastructure in place to support the operation. The 
    current LOM requires sustaining capital only to maintain the existing infrastructure. 
Costs    Based on detailed Annual Operating Plan (AOP) process. Beyond AOP, sustaining capex is 
    based on $/ROMt plus equipment replacements and additions required to deliver the mine 
    plan. 
    First principles estimating are aligned with AOP. Budget prices for major consumables and 
    labour. 
    Adjustments are made for energy. 
    Commodity prices are supplied by the economics and markets team, and are based on: 
    expected demand, current supply, known expansions, and expected incentivised supply. 
    Exchange rates are supplied by the economics and markets team. 
    Transport charges are obtained from the coal chain team based on existing contracts and 
    expected tonnages. 
    State Government royalties based on current NSW royalty rates. 
Revenue factors    Rio Tinto applies a common process to the generation of commodity price estimates across the 
    group. This involves generation of long-term price curves based on: current sales 
    contracts, industry capacity analysis, global commodity consumption, and economic 
    growth trends. In this process, a price curve rather than a single price point is used to 
    develop estimates of mine returns over the life of the mine. The detail of this process and 
    of the price point curves is commercially sensitive and is not disclosed. 
Market assessment    The supply and demand situation for coal is affected by a wide range of factors, and coal 
    consumption changes with economic development and circumstances. Rio Tinto Coal 
    Australia delivers products aligned with its Mineral Resources and Ore Reserves, these 
    products have changed over time and successfully competed with coal products supplied 
    by other companies. 
Economic    Economic inputs such as foreign exchange rates, carbon pricing, and inflation rates are 
    also generated internally at Rio Tinto. The detail of this process is commercially sensitive 
    and is not disclosed. 
Social    There are no claims to Native Title over the MTW lease area. No Reserves have been 
    omitted on this basis. 
    Rio Tinto Coal Australia established the Upper Hunter Valley Cultural Heritage Working 
    Group as a consultation and management process to negotiate cultural heritage issues 
    with local Aboriginal communities. As part of releasing a ground disturbance permit on 
    site, authority must be gained to destroy/remove sites of cultural interest. This involves 
    archaeological mapping and removal of artefacts prior to ground disturbance. 
    There are no sites of European heritage within the existing area of MTW operations. No 
    reserves have been omitted on this basis. 

 

12


 

Other    Semi-quantitative risk assessments have been undertaken throughout the LOM and 
    Reserve phases. No material naturally occurring risks have been identified through the 
    above mentioned risk management processes. 
Classification    The Ore Reserves consist of 85% Proved Reserves and 15% Probable Reserves Mount 
    Thorley area. 
    The Ore Reserves consist of 50% Proved Reserves and 42% Probable Reserves Warkworth 
    area. 
    The Competent Person is satisfied that the stated Ore Reserve classification reflects the 
    outcome of technical and economic studies. 
Audits or reviews    MTW has had one audit completed in the past six years. The audit was conducted in 
    March 2010 by the Xstract Group (report: Resources and Reserves Internal Audit Report 
    Executive Summary Mt Thorley Warkworth). 
    The review concluded that the fundamental data collection techniques are appropriate and 
    consistent with previously audited MTW models. 
Discussion of relative    Rio Tinto Coal Australia operates multiple mines in QLD and NSW. The Ore Reserve 
accuracy/ confidence    estimation techniques utilised for the Mount Thorley Warkworth Mine are consistent with 
    those applied across the other operations. Reconciliation of actual ROM production with 
    the Ore Reserve estimate for the existing operations is generally within 6% for tonnage 
    and grade. This result is indicative of a robust Ore Reserve estimation process. 
    Accuracy and confidence of modifying factors will continue to be monitored to identify 
    potential improvements. 

 

 

 

 

 

 

 

13


 

Appendix 3

Hail Creek Table 1

The following table provides a summary of important assessment and reporting criteria used at Hail Creek Mine for the reporting of exploration results, Mineral Resources and Ore Reserves in accordance with the Table 1 checklist in The Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition). Criteria in each section apply to all preceding and succeeding sections.

SECTION 1 SAMPLING TECHNIQUES AND DATA

Criteria  Commentary 
Sampling techniques    A combination of open hole (predominantly for structural definition) and cored (for coal 
    quality (CQ), geotechnical and gas sampling) have been used.
Drilling techniques    6,058 drill holes (578,879m) support the Resource estimate. Cored drilling represents 17% 
    of the total metres, and open hole drilling 83%. The drill holes are up to 518m deep and 
    average 84m. The drill holes were all nominally recorded as vertical with a redrill required if 
    the hole exceeds specified deviation. 
    Coring has predominantly been done using a 4C-sized bit (576 holes at 100mm) and open 
    hole drilling to an equivalent hole diameter size. In addition a number of HQ-3, PQ-3 and 
    large diameter (LD) holes have been drilled: 98 holes HQ-3 (63mm), 95 holes PQ-3 
    (83mm), and 83 holes LD (200mm) diameter sizes. 
Drill sample recovery    Standardised Rio Tinto Coal Australia logging systems are utilised for all drilling logging 
    and sampling. 
    Core recovery is recorded by the geologist while logging the drill hole. If core recovery for a 
    coal ply is less than 95%, then that section of the hole is redrilled to ensure a 
    representative sample is taken. 
    Ply samples are checked for representativeness using a theoretical mass that is 
    determined using analysed relative density, sample thickness and core diameter prior to 
    composite definition. 
    Open hole chip recovery is assessed qualitatively by the rig geologist. 
Logging    Core is geologically and geotechnically logged and open hole chip samples are taken every 
    1m and logged for lithology changes. Logging for lithology, grainsize, weathering and 
    hardness is conducted using standard dictionary definitions. Colour and any additional 
    qualitative comments are also recorded. All core is photographed on both a core table 
    (0.5m increment) and a single 2.8m core tray basis for 4-C and PQ-3 and single 4.5m core 
    tray basis for HQ-3. Chips are photographed in 20m ™ 1m intervals. 
    All holes are logged using a comprehensive suite of downhole geophysics tools (calliper, 
    gamma, density, neutron, sonic, verticality, temperature) with acoustic scanner (for 
    geotechnical assessment) also run on cored holes. 
Sub-sampling    Core sampling is completed at the drill site and based on set of standard criteria 
techniques and    (determined by lithology and structure). Samples are bagged at the drill site and then 
sample preparation    transported to an external accredited laboratory for analysis as a complete hole batch. 
    All samples are weighed, air-dried and then re-weighed before being crushed to a 19mm 
    top size. A rotary splitter is used to divide the sample into portions available for further CQ 
    analysis. 
    CQ analysis is by a three stage method involving raw analysis on all plies followed by 
    washability and product testing on composite samples as defined by the project geologist. 
    All sample treatment and analysis is conducted according to procedures which adhere to 
    Australian (or International equivalent) standards in a National Association of Testing 
    Authorities certified laboratory. 
Quality of assay data    Non-formalised quality assurance/quality control (QAQC) involving duplicate samples is 
and laboratory tests    completed and, in addition, Rio Tinto Coal Australia checks laboratory round robin and basic 
    reproducibility tests provided by the primary laboratory. All results are assessed via cross- 
    plots and statistics for precision and accuracy. 
Verification of    All CQ sampling and analysis is overseen and checked by other Rio Tinto personnel. 
sampling and    Data transfer from site is covered by an agreed protocol. This system documents primary 
assaying    data, data entry procedures, data verification, and data storage (physical and electronic) 
    into a geological database. 

 

1


 

Location of data   

The topographic grid has been constructed from an orthophoto DTM obtained from AAM 

points   

Hatch on 18 June 2002. The grid has a 20m cell size and covers the entire Hail Creek 

   

Syncline as shown in Figure 2 below. 

   

All surveyed co-ordinates are within Australian Geodetic Datum 1984 (MGD84) MGA Zone 

   

55. 

   

Drill hole collars were surveyed post drilling by licensed surveyors (Hail Creek Mine 

   

employees) using differential GPS with an accuracy of ±10mm.

   

Downhole surveying has been undertaken using downhole verticality and calliper tools for 

   

all holes 2005 onwards. From all holes drilled and modelled at Hail Creek, 49% of cored 

   

holes have verticality data and 44% of open holes have verticality data recorded. 

Data spacing and   

Drill hole spacing for core holes is on an equilateral triangle grid of 500m or less. For open 

distribution   

holes, spacing is on a 250m or less equilateral triangle grid. Holes for sub-crop delineation 

   

were drilled on a distance as required (observed <100m). 

   

Due to the maturity of the exploration, the majority of the recently drilled holes (2012 to 

   

2015) were not set on a grid basis but rather governed by required data. 

   

Pre-production holes are based on sub-100m grid spacing (between 75m- 86m). 

   

All core samples are composited within defined seam boundaries. 

Orientation of data in   

The Coal Measures show relatively consistent layering and are not subject to steep dips – 

relation to geological   

the orientation of drilling is therefore suitable for flat lying stratified deposits. 

structure     
Sample security   

Core/chip samples are taken at the drill site and then transported daily to the exploration 

   

office for storage under refrigeration. Once the hole has been completed the samples are 

   

transported to the laboratory via a dedicated courier service again under refrigeration. 

Audits or reviews   

Hail Creek has had three audits completed in the past six years, they include: 

    o  An audit in September 2014 conducted by the Xstract Group (report: Rio Tinto 
      Group Audit and Assurance Resources Internal Audit: Hail Creek Mine) 
    o  An audit in October 2010 conducted by the Xstract Group (report: Resources and 
      Reserves Internal Audit – Hail Creek Mine. Project No. P1361) 
    o  An audit in November 2009 conducted by Snowden (report: Rio Tinto Corporate 
      Assurance: Resources and Reserves Internal Audit – Hail Creek Mine. Project No. 
      00509). 
    These reviews concluded that the fundamental data collection techniques are appropriate. 

 

SECTION 2 REPORTING OF EXPLORATION RESULTS

Criteria  Commentary 
Mineral tenement and   

Hail Creek Mine is operated under a joint venture agreement. The joint venture partners 

land tenure status   

are listed below: 

    o 

Queensland Coal Pty Limited* 

(82% share) 

    o 

Marubeni 

(6.6667% share) 
    o 

Sumisho 

(3.3333% share) 

    o 

Nippon Steel Australia 

(8% share). 

     

* A 100% owned subsidiary of Rio Tinto Ltd. 

   

The area making up the Hail Creek Resource model makes up the eastern portion of ML 

   

4738. 

   

Other licences and permits includes: 

    o  two exploration permits 
    o 

two mining development licences. 

 

2


 

Exploration done by    Small government and private coal exploration was undertaken between 1887 and 1969, 
other parties    but only small Reserves were reported for the Elphinstone and Kemmis Creek coalfields. 
    The realisation of the Hail Creek syncline for coking coal was not until 1969. Mine 
    administration undertook extensive exploration during the 1970s. The project partners 
    took some poor options in testing the coal. Frequent changes of project ownership and 
    personnel hampered the interpretation and documentation of this early work. 
    All exploration of the Hail Creek Syncline after the major partnering of Rio Tinto in the 
    early 1990s was conducted by Pacific Coal Pty Ltd followed by the current custodian, Rio 
    Tinto Coal Australia Pty Ltd. 
Geology    Hail Creek is located in the northern part of the Bowen Basin which contains numerous 
    important coal producing intervals in the Permian stratigraphy. The Late Permian Fort 
    Cooper and Rangal Coal Measures host the coal deposits mined at Hail Creek. The main 
    rock types of these measures are sandstone, siltstone and conglomerate, which occur with 
    coal and tuffaceous claystone. 
Drill hole information    Drilling data summary of Hail Creek for periods 1993-2001 and 2003-2014: 

 

Table 1: Drilling activities for period 1993-2001
Year 

Open
Holes

 

HQ3
Core

 

100mm 
Core

 

Large 
Core 

Totals 
 
1993 
 

No . of holes 

7   2   -   8  17 

Metres drilled 

612   88   -   369  1,069 
 
1994 
 

No . of holes 

46   -   -   -  46 

Metres drilled 

4,220   -   -   -  4,220 
 
1995-96 
 

No . of holes 

392   19   53   11  475 

Metres drilled 

26,903   718   4,712   705  33,038 
 
1997 
 

No . of holes 

65   -   13   34  112 

Metres drilled 

7,566   -   844   2,008  10,417 
 
1998 
 

No . of holes 

602   1   50   -  653 

Metres drilled 

29,263   37   2,698   -  31,998 
 
2001 
 

No . of holes 

-   -   -   6  6 

Metres drilled 

-   -   -   292  292 
 
Table 2: Drilling activities for period 2003-2015
Year  Drilling 

Open 

HQ3   PQ3  

100mm

 

Large 

Totals 
 

Detail 

Holes 

Core 

 

Core

 

Core

  Core   
 

No . of 

                 
 

holes 

508  9   -   173   3  693 
2003  Metres  22,418  559   -   7,323   149  30,449 
 

drilled 

                 

 

3


 

 

No . of 

           
2004 

holes 

781  10  -  82  11  884 
 

Metres 

46,043  326  -  7,680  965  55,014 
 

drilled 

           
 
 

No . of 

           
2005 

holes 

1,033  38  -  83  7  1,161 
 

Metres 

99,420  8,832  -  8,527  829  117,608 
 

drilled 

           
 
 

No . of 

           
2006 

holes 

248  -  -  32  -  280 
 

Metres 

15,927  -  -  2,184  -  18,111 
 

drilled 

           
 
 

No . of 

           
2007 

holes 

511  -  -  53  -  564 
 

Metres 

39,757  -  -  4,741  -  44,498 
 

drilled 

           
 
 

No . of 

           
2008 

holes 

51  0  0  30  16  97 
 

Metres 

6,289  0  0  4,909  1,777  12,975 
 

drilled 

           
 
 

No . of 

           
2009 

holes 

126  4  0  84  7  221 
 

Metres 

22,525  721  0  13,866  662  40,832 
 

drilled 

           
 
 

No . of 

           
2010 

holes 

242  -  -  45  5  292 
 

Metres 

39,753  -  -  7,047  704  47,504 
 

drilled 

           
 
 

No . of 

           
2011 

holes 

118  6  26  29  0  179 
 

Metres 

23,992  1,618  8,592  5,297  0  39,499 
 

drilled 

           
 
 

No . of 

           
2012 

holes 

134  5  12  12  0  162 
 

Metres 

30,122  1,429  2,592  2,734  0  36,108 
 

drilled 

           
 
 

No . of 

           
2013 

holes 

157  27  24  0  0  208 
 

Metres 

45,429  7,298  4,654  0  0 

57,381 

 

drilled 

           
 
 

No . of 

           
2014 

holes 

41  2  23  0  0  66 
 

Metres 

19,025  764  3,478  0  0  23,267 
 

drilled 

           
 
 

No . of 

           
2015 

holes 

34  4  0  0  5  43 
 

Metres 

8,847  681  0  0  632  10,160 
 

drilled 

           

 

 

 

Since the previous resources upgrade in 2011 there have been an additional 370 
    drillholes added due to new drilling or database updates 
Data aggregation 

 

Ply samples are combined to create composites (for washability and product coal 
methods   

analyses) representing mineable seam working sections. 

Relationship between 

 

Based on drilling techniques and stratigraphy, the coal seam intercepts approximate true 
mineralisation widths   

coal thickness. 

and intercept lengths     

 

4


 


5


 


 

6


 

Balanced reporting    Not applicable. Rio Tinto Coal Australia has not specifically released exploration results for 
    these deposits. 
Other substantive    In addition to drilling, a 3D seismic survey (underground exploration target) and airborne 
exploration data    magnetic surveys have been completed to delineate structure, faults, dykes, and alluvial 
    limits.   
Further work    Drilling for both pre-production and strategic brownfields, and analytical (CQ, 
    geotechnical, gas) results will be ongoing. 
    Brownfields exploration includes a potential eastern margin, an underground Resource, 
    and potential coal Resources in the south of the syncline. 
 

SECTION 3 - ESTIMATION AND REPORTING OF MINERAL RESOURCES 

 
Criteria  Commentary 
Database integrity    All drill hole data are securely stored in a database which is stored on the Brisbane server 
    and is backed up daily. 
    Data are validated at the drill site and also prior to loading into the database by the 
    responsible geologist. 
    The database contains automated validation processes, during data loading to prevent un- 
    validated data being loaded. 
Site visits    The Resources Competent Person visited Hail Creek in 2015. 
Geological    The deposit is a south-southeast plunging, asymmetrical syncline with all major structures 
interpretation    defined. The deposit is part of a series of anticlines and synclines known as the Nebo 
    Synclinorium. Infill drilling, 3D seismic, mining exposure and mapping has supported and 
    refined the model. The current interpretation is thus considered to be robust. 
Dimensions    The deposit trends 14km north-northwest to south-southeast and is 6km in width. The 
    deposit extends to a depth of 530m below the topographic surface in the south. 
Estimation and    Modelling was undertaken using resource modelling software. For structural modelling the 
modelling techniques    Fine Element Method (FEM) interpolator is used and for CQ an inverse distance squared 
    interpolator is used. All surfaces and coal qualities are interpolated into grids with 20m ™ 
    20m node spacing. 
    The model is of the coal seams only and waste modelled by default and not assigned any 
    grade. Resource estimates are therefore of the coal seams only and restricted on a whole 
    seam group basis only. 
    Modelling is completed on an iterative basis with checking of cross-sections and contours 
    of structural and CQ attributes. Database values are posted on contours as a further 
    check. A volume/tonnage check between the model and its predecessor are completed as 
    a final validation. 
Moisture    All tonnages are estimated on an in situ moisture basis, which is determined to be 5%. 
Cut-off parameters    Nominally coal is washed to produce three products: 
    o  a premium low-ash (8.5 per cent) prime hard coking product 
    o  a higher ash (10 per cent) hard coking product. 
    o  a high ash (23-35 per cent) thermal product 
    Blending of coal from the two major seams (Elphinstone and Hynds) is common. 
    A secondary thermal product has recently been introduced from the rejects streams of the 
    above products and is a 25% ash product. 
    The site also produces smaller amounts of bypass thermal rejects. 
    For all products, product moisture is 10%. Air-dried moisture is quoted at a 1.5% moisture 
    basis.   
Mining factors or    Development of this Mineral Resource estimate assumes mining using standard 
assumptions    Rio Tinto Coal Australia equipment. 
    The assumed open-cut mining method is overburden removal via draglines, and 
    conventional truck and shovel open pit coal mining. 
    Mining practices utilise detailed extraction plans to effectively manage grade control. 

 

7


 

   

These extraction plans are generated from short term geological models, in pit visual 

   

inspections and survey monitoring and control. 

   

Conceptual underground mining will be by longwall methods and, in addition, bord and 

   

pillar and highwall mining extraction styles have been considered 

Metallurgical factors   

It is assumed that a combination of density separation (magnetite/water) and fines 

or assumptions   

flocculation processes used by Rio Tinto Coal Australia will be applicable for the 

   

processing of Hail Creek coal. 

Environmental factors   

Rio Tinto Coal Australia has an extensive environmental and heritage approval and 

or assumptions   

compliance process. No issues are expected that would impact on the Mineral Resource 

   

estimate. 

Bulk density   

All boreholes are reported on relative density (RD). 

   

The in situ relative density; i.e. the density of materials at an in situ moisture basis, was 

   

calculated using the Preston and Sanders equation: 

   

          RD2=[RD1*(100-M1)]/[100+RD1*(M2-M1)-M2] 

   

Where RD1 is true RD (ad), M1 is moisture (ad) and M2 is the in situ moisture. 

Classification   

The classification of the Mineral Resources into varying confidence categories is based on 

   

a standardised process of utilising points of observation (PoO) (ie drill holes) according to 

   

their reliability and value in estimation. The points of observation are used to categorise 

   

structure and quality continuity (or both) or support continuity.

   

Radii of influence are then plotted around PoO maps for structure and quality. The radii of 

   

influence were determined by consideration of the perceived and observed variability in 

   

structure and CQ for seams, and using small radii than that recommended in a 

   

geostatistical review previously undertaken. 

   

Areas of confidence (low, medium, high) are produced from these plots (structure, CQ for 

   

each seam) and these are finally combined to produce areas of Measured, Indicated and 

   

Inferred which are used to subdivide the resource tonnage estimates. 

   

In summary structural radii range 125-250m for high confidence, 250-500m for medium 

   

and 750-1,500m for low; and, for CQ 250-500m radii for high, 500-1,000m for medium and 

   

1,500-3,000m for low confidence respectively. 

   

The Competent Person is satisfied that the stated Mineral Resource classification reflects 

   

the geological controls interpreted and the estimation constraints of the deposits. 

Audits or reviews 

 

Hail Creek has had three audits completed in the past six years, they include: 

   

o 

An audit in September 2014 conducted by the Xstract Group. No material errors 

     

were noted in the model, only a few minor discrepancies were identified. The 

     

model was considered to be fit for the purposes of resource and reserve 

     

estimation and mine planning. 

   

o 

An audit in October 2010 conducted by the Xstract Group 

   

o 

An audit in November 2009 conducted by Snowden 

   

o 

An external audit of the methodology of for defining “eventual economic 

     

extraction” (via Whittle for opencast and advanced economic analysis of 

     

underground) was completed by Xstract Mining Consultants in 2015. This 

     

considered the process to be a robust, transparent and fit for purpose 

     

methodology. 

   

These reviews concluded that the modelling and estimation techniques are appropriate 

Discussion of relative   

Rio Tinto Coal Australia operates multiple mines in New South Wales (NSW) and 

accuracy/ confidence   

Queensland. The Mineral Resource data collection and estimation techniques used for the 

   

Hail Creek deposit are consistent with those applied at other deposits which are being 

   

mined. Reconciliation of actual production with the Mineral Resource estimates for the 

   

existing operational deposits are generally within three percent for tonnes. This result is 

   

indicative of a robust process. 

 

 

Accuracy and confidence of Mineral Resource estimation estimate has been accepted by 

   

the Competent Person. 

 
 

SECTION 4 ESTIMATION AND REPORTING OF ORE RESERVES 

 
Criteria  Commentary 
Mineral Resource 

 

A 3D gridded resource model of topography, structure and quality are used for in situ 

 

8


 

estimate for    resource definition. 
conversion to Ore    Mine design strips and blocks are applied to the in situ resource model to generate the raw 
Reserves    Reserves used to create a separate mine schedule database. The mine schedule database 
    also reflects working sections or seam aggregations, mining methods and associated loss 
    and dilution impacts. The mine schedule database is used as the basis for Coal Reserves 
    reporting. 
    Coal Resources are in addition to Coal Reserves. 
Site visits    The Reserves Competent Person visited Hail Creek in 2015. 
Study status    Hail Creek is an operating mine project. The reportable Ore Reserve is based on the Life of 
    Mine (LOM) plan assumptions and has determined a mine plan that is technically 
    achievable and economically viable, and that material modifying factors have been 
    considered. This update to reserves is a result of the completion of Pre-Feasibility studies 
    and evaluations that include the eastern margin. 
Cut-off parameters    Periodic (<3yrs) pit optimisation work used to define pit shells is conducted using Rio Tinto 
    economics prices and an estimate of unit operating costs including a $/ROMt allowance for 
    sustaining capex. 
    For annual JORC Reserves reporting purposes, detailed mine design and schedules are 
    constructed to generate detailed cash flow schedules. This work includes identifying the 
    mining sequence, equipment requirements, incremental and sustaining capital. 
    A discounted cashflow analysis is conducted to re-assess under the latest economic 
    assumptions the potential Reserves that remain net cashflow positive. 
Mining factors or    The declared Ore reserves are for open cut only. 
assumptions    The Hail Creek mine utilises dragline, truck and shovel for waste movement, while coal is 
    loaded using a combination of loaders and excavators with haulage to the Run Of Mine 
    (ROM) hopper undertaken using rear dump trucks. The operations are supported by 
    additional equipment including dozers, graders and water carts.
    All pits and strips have been designed based on the existing operation with inclusion of 
    access ramps, minimum mining widths, nominal bench heights and designed geotechnical 
    criteria including the Slope Dump Management Plan (SDMP) for Hail Creek. This detailed 
    design also considers pit access requirements, equipment selection, production 
    sequencing, and safety. The pit designs are integrated with the spoil designs for dragline 
    and for truck and shovel. 
    Working section or seam aggregation logic pre-determines what is defined as mineable 
    coal by applying working section tests based on minimum coal thickness of 30cms. 
    Coal loss and dilution factors are also applied and vary by the equipment type uncovering 
    the various coal seams (i.e. excavator/truck versus dragline). Typical roof and floor coal 
    loss thickness ranges from 2cm–59cm. Typical roof and floor waste dilution thickness 
    ranges from 4cm–16cm. 
    Life of Mine Plans for strategic planning purposes may contain Inferred Resources, 
    provided that the LOM plan would not be compromised by non-inclusion of this coal. 
    Inferred Resources included in LOM plans retain this designation and are not to be 
    referred to as Reserves. Neither are they to be reported in JORC or Securities and 
    Exchange Commission compliant reserve statements. 
    Hail Creek mine has only limited (<11%) inferred coal within the existing LOM plan. 
Metallurgical factors    Hail Creek has a coal handling and preparation plant (CHPP) that is operational, which is 
or assumptions    used as a coal handling plant and is also used to wash coal. 
    The processes used are standard for the coal industry and so are well tested technologies. 
    All samples are wash/cut-point tested and so the representativeness of test work 
    undertaken is implicit in the resource classification status. 
    In-seam dilution is included in sample testing. 
    Coal Reserve estimation is based on existing product specifications. 
    A secondary thermal product is a feature of the reserves and is produced from the rejects 
    streams of the primary products. 
    The reserve is based on inclusion of a secondary 25% ash thermal that has been tested 
    with the market throughout 2014/2015. 
Environmental    Coarse rejects are combined with fine tailings to form a co-disposal slurry that is pumped 
    to an emplacement area. Rejects material must be covered by inert waste rock material. 

 

9


 

    Ex-pit dumps are offset from any creeks to prevent any constriction of creek flows. 
    Overburden waste rock has low acid forming potential. 
Infrastructure    Hail Creek is an operating site with existing major infrastructure in place to support the 
    ongoing operation. The current LOM requires moderate additional capital to be able to 
    extend operations. A detailed infrastructure plan and costing has been undertaken as part 
    of Prefeasibility studies and evaluations, which includes additional requirements for 
    mining in the eastern margin and continuation of the current western margin. 
Costs    Based on detailed Annual Operating Plan (AOP) process. Beyond AOP, sustaining capex 
    based on $/ROMt plus equipment replacements and additions required to deliver the mine 
    plan. 
    First principles estimating and aligned with AOP. Budget prices for major consumables 
    and labour. 
    Adjustments are made for ash. 
    Commodity prices supplied by the economics and markets team, based on expected 
    demand, and current supply, known expansions and expected incentivised supply. 
    Exchange rates supplied by the economics and markets team. 
    Transport charges obtained from coal chain team based on existing contracts and 
    expected tonnages. 
    State Government royalties are based on current Queensland (QLD) royalty rates. 
Revenue factors    Rio Tinto applies a common process to the generation of commodity price estimates across the 
    group. This involves generation of long-term price curves based on current sales 
    contracts, industry capacity analysis, global commodity consumption and economic 
    growth trends. In this process, a price curve rather than a single price point is used to 
    develop estimates of mine returns over the life of the project. The detail of this process 
    and of the price point curves is commercially sensitive and is not disclosed. 
Market assessment    The supply and demand situation for coal is affected by a wide range of factors, and coal 
    consumption changes with economic development and circumstances. Rio Tinto Coal 
    Australia delivers products aligned with its Mineral Resources and Ore Reserves, these 
    products have changed over time and successfully competed with coal products supplied 
    by other companies. 
Economic    Economic inputs such as foreign exchange rates, carbon pricing, and inflation rates are 
    also generated internally at Rio Tinto. The detail of this process is commercially sensitive 
    and is not disclosed. 
Social    There are no Native Title Claims over Hail Creek that would impact on Reserves. No 
    Reserves have been omitted on this basis. 
    A process is embedded in the normal operating regime at Hail Creek to provide cultural 
    heritage clearance such that no effects are expected to restrict the Hail Creek Reserves. 
    As part of releasing a ground disturbance permit on site, authority must be gained to 
    destroy/remove sites of cultural interest. This involves archaeological mapping and 
    removal of artefacts prior to ground disturbance. 
    There are no sites of European Cultural Heritage at Hail Creek. 
Other    Semi-quantitative risk assessments have been undertaken throughout the LOM and 
    Reserve phases. During this process, one small pit (R102N) in the north east was 
    identified as being at risk to successfully complete the tenure process and as such has 
    been removed from reserves. Subsequently due to shared capital another smaller pit to 
    the north (R100N) was also removed from reserves. 
    R1E a small pit in the R1S endwall was also assessed further and removed from reserves 
    due to short-term waste dump benefit and access/haulage issues.
    No other material naturally occurring risks have been identified through the above 
    mentioned risk management processes. 
Classification    The Ore Reserves consist of 32% Proved Reserves and 68% Probable Reserves across the 
    deposit. The Western Margin Ore Reserves consist of 87% Proved Reserves and 13% 
    Probable Reserves. The Ore Reserves in the Eastern margin are 100% Probable Reserves. 
    The Competent Person is satisfied that the stated Ore Reserve classification reflects the 
    outcome of technical and economic studies. 

 

10


 

Audits or reviews   

Hail Creek has a number of audits and reviews completed in the past five years, they 

   

include: 

   

o 

An audit in June 2015 conducted by Rio Tinto Group Audit & Assurance and 

     

Xstract Mining Consultants (reports: Reserves Internal Audit Report – June 2015) 

   

o 

An series of reviews in 2014/2015 conducted by the Encompass mining group 

     

(reports: External review of the HCX PFS mine Planning Data and modelling – April 

     

2014; External review of the HCX Step 2 PFSA Mine Planning Data and modelling 

     

– December 2014; External review of the HCX PFS Step 3 - Minemax case matrix 

     

definition and methodology – February 2015; External review of the HCX PFS Step 

     

4 – Deswik Scheduling – April 2015) 

   

o 

A review in December 2014 conducted by MEC mining (reports: Hail Creek East 

     

Mine Plan Review – December 2014) 

   

o 

An audit in October 2010 conducted by the Xstract Group (report: Resources and 

      Reserves Internal Audit – Hail Creek Mine. Project No. P1361) 
   

These reviews concluded that the fundamental data collection and modelling techniques 

   

are appropriate and consistent with previously audited Hail Creek models. 

Discussion of relative   

Rio Tinto Coal Australia operates multiple mines in Queensland and New South Wales. The 

accuracy/ confidence   

Ore Reserve estimation techniques utilised for the Hail Creek Operation are consistent 

   

with those applied across the other operations. Reconciliation of actual production with 

   

the Ore Reserve estimate for the existing operations is generally within 5% for tonnage 

   

and grade. This result is indicative of a robust Ore Reserve estimation process. 

   

Accuracy and confidence of modifying factors are generally consistent with the current 

   

operation. 

 

 

 

 

 

 

 

 

 

 

 

11


 

Appendix 4

Kestrel Hub Table 1

The following table provides a summary of important assessment and reporting criteria used at Kestrel Mine for the reporting of exploration results, Mineral Resources and Ore Reserves in accordance with the Table 1 checklist in The Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition). Criteria in each section apply to all preceding and succeeding sections.

SECTION 1 SAMPLING TECHNIQUES AND DATA

Criteria  Commentary 
Sampling techniques    A combination of open hole (predominantly for structural definition) ,cored (for coal 
    quality (CQ), geotechnical and gas sampling) and channel sampling have been used. 
Drilling techniques    1,473 drill holes (346,709 metres) support the Resource estimate. Cored drill holes 
    represent 39% of the total holes and open holes 61%. The drill holes are up to 609m in 
    length and average 233m. The drill holes were all nominally recorded as vertical; 
    boreholes deviated by more than 5% were to be re-drilled by contractor. 
    Coring has predominantly been done using a HQ3-sized (63mm) bit and open hole drilling 
    to an equivalent hole diameter size. In addition a limited number of large diameter (LD) 
    holes have been drilled: 22 holes at 150mm (6”), and 14 holes at 200mm (8”) diameter 
    sizes. 
Drill sample recovery    Standardised Rio Tinto Coal Australia logging systems are utilised for all drilling logging 
    and sampling. 
    Core recovery is recorded by the geologist while logging the drill hole. . If core recovery for 
    a coal ply is less than 95%, then that section of the hole is redrilled to ensure a 
    representative sample is taken. 
    Ply samples are checked for representativeness using a theoretical mass that is 
    determined using analysed relative density, sample thickness and core diameter prior to 
    composite definition. 
    Open hole chip recovery is assessed qualitatively by the rig geologist. 
Logging    Core is geologically and geotechnically logged and open hole chip samples are taken every 
    1m and logged for lithology changes. Logging for lithology, grainsize, weathering and 
    hardness is conducted using standard dictionary definitions. Colour and any additional 
    qualitative comments are also recorded. 
    All core is photographed on both a core table (0.5m increment) and a 5m tray basis. Chips 
    are photographed as laid out by 1m intervals. 
    All holes are logged using a comprehensive suite of downhole geophysics tools (calliper, 
    gamma, density, neutron, sonic), with acoustic scanner (for geotechnical assessment) also 
    run on cored holes. 
Sub-sampling    Core sampling is completed at the drill site and based on set of standard criteria 
techniques and    (determined by lithology and structure). Samples are bagged at the drill site and then 
sample preparation    transported to an external accredited laboratory for analysis as a complete hole batch All 
    samples are weighed, air-dried and then re-weighed before being drop shattered from 2m 
    ten times. The product is dry sized at 25, 16, 8, 4, 2, 1, 0.5 (ww) mm and weigh size 
    fractions. The size fractions are then recombined into one whole sample and dry tumbled 
    for three minutes. The sample then goes through wet pre-treatment, float/sink and froth 
    flotation testing before undergoing raw coal analysis. 
    CQ analysis is by a three stage method involving raw analysis on all plies followed by 
    washability and product testing on composite samples as defined by the project geologist 
    All sample treatment and analysis is conducted according to procedures which adhere to 
    Australian (or International equivalent) standards in a National Association of Testing 
    Authorities certified laboratory. 
Quality of assay data    Non-formalised quality assurance/quality control (QA/QC) involving duplicate samples is 
and laboratory tests    completed. In addition, Rio Tinto Coal Australia checks laboratory round robin and basic 
    reproducibility tests provided by the primary laboratory. All results are assessed via cross- 
    plots and statistics for precision and accuracy. 

 

1


 

Verification of    All CQ sampling and analysis is overseen and checked by other Rio Tinto personnel. 
sampling and    Data transfer from site is covered by an agreed protocol. This system documents primary 
assaying    data, data entry procedures, data verification, and data storage (physical and electronic) 
    into a geological database. 
Location of data    The topographic surface is derived from a combination of aerial survey data and drill hole 
points    collars. 
    All surveyed coordinates are within Australian Geodetic Datum 1984 Zone 55. 
    Drill hole collars were surveyed post drilling by licensed surveyors using differential GPS 
    with an accuracy of ±10mm. 
    Downhole surveying has been undertaken using downhole verticality and calliper tools. 
Data spacing and    Drill hole spacing for core holes is on an equilateral triangle grid of 500m or less. Open 
distribution    holes spacing is on a 250m or less equilateral triangle grid. 
    All core samples are composited within defined seam boundaries. 
Orientation of data in    The Coal Measures show a relatively consistent layering and are not subject to steep dips. 
relation to geological    The orientation of drilling is therefore suitable for flat lying stratified deposits. 
structure     
Sample security    Core/chip samples are taken at the drill site and then transported daily to the refrigerated 
    Kestrel storage area. Once the hole has been completed the samples are transported to 
    the laboratory via a dedicated courier service, again under refrigeration. 
Audits or reviews 

 

Kestrel has had three audits completed in the past seven years, they include: 
    o  An external audit of the structural and CQ databases, and models was completed 
      by Xenith Consulting in 2007. No material errors were noted in the model, only a 
      few minor discrepancies were identified. The model was considered to be fit for 
      the purposes of resource and reserve estimation and mine planning. 
    o  An external audit of the CQ database was completed by McMahon Coal Quality 
      Resources in 2007. This audit concluded that the level of errors detected unlikely 
      to significantly affect modelled CQ values. 
    o  An internal technical evaluation group (TEG) peer review of the CQ estimate of 
      coking coal grade (fluidity and rank), and Kestrel Mine extension (KME) Project 
      valuation in 2007 found sufficient confidence in CQ grade estimates for the KME 
      Project to be approved in December 2007. 
 

 

These reviews concluded that the fundamental data collection techniques are appropriate. 
 
SECTION 2 REPORTING OF EXPLORATION RESULTS 
 
Criteria  Commentary 
Mineral tenement    The Kestrel West Project and Kestrel Mine are managed by Kestrel Coal Pty Limited on 
and land tenure    behalf of the Kestrel Coal Joint Venture. The Joint venture participants are: 
status    o  Queensland Coal Pty Ltd (QCPL)  (share: 80%) 
    o  Mitsui Kestrel Coal Investment Pty Limited (Mitsui)  (share: 20%). 
    Kestrel Mine contains the following leases and licences: 
    o  Four mining leases (ML) covering 9507. 332ha 
    o  Three mineral development licences (MDL) totalling 14,089.6033ha, of which one 
      MDL (totalling 12,608.293ha) is pending approval for grant of renewal. 
    The Kestrel West Project is contained within MDL 182 and all leases are in good standing. 
    Previously Kestrel and Kestrel West have been reported separately for reosurces and 
    reserves. 

 

2


 

 

Exploration done by    Mid to late 1960s: Regional exploration for open-cut coking coal was undertaken by the 
other parties    Bellambi Coal Company and Mount Isa Mines Ltd. 
    1971–1975: The Queensland Department of Mines drilled 37 holes. 
    1982: The Denham Coal Associates Joint Venture (DCAJV) was awarded tenure. 
    1982–1984: DCAJV drilled 280 drill holes. 
    March 1985: A feasibility study confirmed the technical and economic feasibility of a single 
    longwall operation. 
    1988–1990: An exploration drift was completed. 
    August 1990: Mine construction commenced. 
Geology    The Kestrel deposit is located in the southwest part of the northern Bowen Basin. The 
    northern Bowen Basin is the northernmost part of the 1800km long Bowen-Gunnedah- 
    Sydney Basin, a meridional accumulation of Permian and Triassic sediments in eastern 
    Queensland (QLD) and New South Wales (NSW). 
    The Kestrel deposit is located on the Comet Platform on which deformation is limited to 
    broad, low amplitude basin and dome structures. The Kestrel resource is located on the 
    western limb of the gently south-westerly plunging Talagai Syncline which defines the 
    prevailing southerly to south-easterly regional dip in the mine area. The sequence at the 
    Kestrel deposit comprises the German Creek Formation overlain by the Macmillan and 
    Fairhill Formations. 
    At Kestrel, coal is mined from the German Creek Seam which is hosted in the German 
    Creek Formation. 

 

3


 

Drill hole information 

 

Drilling data summary from Rio Tinto Coal Australia drilling campaigns- note that this 
    table includes only open vertical holes and/or cored holes
 

 

      Since the previous resources upgrade in 2009 there have been an additional 91 
      drillholes added due to new drilling or database updates 
Data aggregation    Ply samples are combined to create composites (for washability and product coal 
methods    analyses) representing mineable seam working sections. 
Relationship between    Based on drilling techniques and stratigraphy, the coal seam intercepts therefore 
mineralisation widths    approximate the true coal thickness. 
and intercept lengths     
Diagrams  
     

 

4


 


 

 

 

 

5


 

Balanced reporting    Not applicable. Rio Tinto Coal Australia has not specifically released exploration results for 
    these deposits. 
Other substantive    Apart from surface exploration drilling, data has been collected from underground drilling 
exploration data    and channel sampling. 
Further work    Drilling (surface and underground) for both pre-production and strategic purposes 
    (including analytical (CQ, geotechnical, gas) sampling) will be ongoing 
 

SECTION 3 - ESTIMATION AND REPORTING OF MINERAL RESOURCES 

 
Criteria  Commentary 
Database integrity    All drill hole data are securely stored in a database which is stored on the Brisbane server 
    and is backed up daily. 
    Data are validated at the drill site and also prior to loading into the GDB database. 
    The GDB database contains automated validation processes (load limits) which are 
    activated during data loading and prevent un-validated data being loaded. 
Site visits    The Resources Competent Person visited Kestrel in 2015. 
Geological    The deposit is well known and tabular (layer-cake) with all major structures defined. Infill 
interpretation    drilling and mining exposure and mapping has supported and refined the model. The 
    current interpretation is thus considered to be robust. 
Dimensions    The deposit trends 17.5km northeast to southwest and is 10km in width. The deposit 

 

6


 

    extends to a depth of 490m below the topographic surface. 
Estimation and    Modelling was undertaken using resource modelling software. For structural modelling a 
modelling techniques    Finite Element Method (FEM) interpolator is used. For CQ an inverse distance squared 
    interpolator with search radius of 5000m is used. All surfaces and coal qualities are 
    interpolated into grids with 50m P 50m node spacing. 
    The model is of the coal seams only with waste modelled by default and not assigned any 
    grade. Resource estimates are therefore of the coal seams only and restricted on a whole 
    seam group basis only. 
    Modelling is completed on an iterative basis with checking of cross-sections and contours 
    of structural and CQ attributes. Database values are posted on contours as a further 
    check. A volume/tonnage check between the model and its predecessor are completed as 
    a final validation. 
    The previous and separate (for Kestrel and Kestrel West) resources upgrade was based on 
    separate resource models – these models have been merged for this update. 
Moisture    All tonnages are estimated on an in situ moisture basis, which is determined as 6%. This is 
    based upon imprecise relationships between air-dried and equilibrium moisture, with in 
    situ moisture tempered by knowledge coal rank and type, water addition during mining, 
    and plant feed moisture. 
Cut-off parameters    Nominally coal is washed to produce three types of products: 
    o  a primary product 6.5% air-dried ash high volatile hard coking coal 
    o  a secondary product 13% air-dried ash thermal coal 
    o 

8.5% air-dried ash high volatile semi-coking coal created by blending the primary 

      and secondary washery products. 
Mining factors or    Development of this Mineral Resource estimate assumes mining using standard 
assumptions    Rio Tinto Coal Australia equipment. The assumed mining method is development and 
    longwall methods and, in addition, bord and pillar style extraction has been considered. 
Metallurgical factors    It is assumed that a combination of density separation (magnetite/water) and fines 
or assumptions    flocculation processes used by Rio Tinto Coal Australia will be applicable for the 
    processing of Kestrel coal. 
Environmental factors    Rio Tinto Coal Australia has an extensive environmental and heritage approval and 
or assumptions    compliance process. No issues are expected that would impact on the Mineral Resource 
    estimate. 
Bulk density    Coal relative density is currently modelled at a 6% in situ moisture basis. Conversion to 
    the in situ moisture basis has been carried out by applying the Preston and Sanders 
    method using the equation: 
    relative density (in situ) =            RDad*(100-Mad)           
      100 RDad*(ISM-Mad)-ISM 
    Where: Rdad = relative density, air-dried basis; Mad = moisture, air-dried basis, ISM = in situ moisture. 
Classification    The classification of the Mineral Resources into varying confidence categories is based on 
    a standardised process of utilising points of observation (PoO) (i.e. drill holes) according to 
    their reliability and value in estimation. The PoO are used to categorise structure and 
    quality continuity (or both) or support continuity. 
    Radii of influence are then plotted around PoO maps for structure and quality. The radii of 
    influence were based on an initial geostatistical study and moderated by consideration of 
    the perceived and observed regional variability in structure and CQ for the German Creek 
    Seam. 
    Areas of confidence (low, medium, high) are produced from these plots (structure, CQ for 
    each seam group) and these are finally combined to produce areas of Measured, Indicated 
    and Inferred which are used to subdivide the resource tonnage estimates. 
    In summary radii are 500m radii for high, 1,000m for medium and 3,000m for low 
    confidence respectively 
    The Competent Person is satisfied that the stated Mineral Resource classification reflects 
    the geological controls interpreted and the estimation constraints of the deposits. 
Audits or reviews    Kestrel has had two audits completed in the past seven years on the estimation and 
    reporting of Mineral Resources, they include: 

 

7


 

    o  An external audit of the structural and CQ databases, and models was completed 
      by Xenith Consulting in 2007. No material errors were noted in the model, only a 
      few minor discrepancies were identified. The model was considered to be fit for 
      the purposes of resource and reserve estimation and mine planning. 
    o  An internal technical evaluation group (TEG) peer review of the CQ estimate of 
      coking coal grade (fluidity and rank), and Kestrel Mine extension (KME) Project 
      valuation in 2007 found sufficient confidence in CQ grade estimates for the KME 
      Project to be approved in December 2007. 
    o  An external audit of the methodology of for defining “eventual economic 
      extraction” (via Whittle for opencast and advanced economic analysis of 
      underground) was completed by Xstract Mining Consultants in 2015. This 
      considered the process to be a robust, transparent and fit for purpose 
      methodology. 
    These reviews validated the modelling and estimation of Resources at Kestrel to-date. 
Discussion of relative    Rio Tinto Coal Australia operate multiple mines in NSW and QLD. The Mineral Resource 
accuracy/ confidence    data collection and estimation techniques used for the Kestrel deposit are consistent with 
    those applied at other deposits which are being mined and is indicative of a robust 
    process. 
    Accuracy and confidence of Mineral Resource estimation estimate has been accepted by 
    the Competent Person. 
 

SECTION 4 ESTIMATION AND REPORTING OF ORE RESERVES 

 
Criteria  Commentary 
Mineral Resource    A 3D gridded resource model of topography, structure and quality is used for in situ 
estimate for    resource definition. 
conversion to Ore    Mine design blocks are applied to the in situ resource model to generate the raw reserves 
Reserves    used to create a separate mine schedule database. The mine schedule database also 
    reflects working sections, mining methods and associated assumptions. The mine 
    schedule database is used for Coal Reserves reporting. 
    Coal Resources are in addition to Coal Reserves. Underground ore reserves are as reported 
    in 2014, with an adjustment for mining depletion. 
Site visits    The Reserves Competent Person has not visited Kestrel in 2015. Due to changes in 
    personnel, the new designated Reserves Competent Person for Kestrel Mine has not been 
    able to travel to the mine site. This will be remedied in subsequent reserves sign-offs. 
Study status    Kestrel is an operating mine. The reportable Ore Reserve is based on the life of mine 
    (LOM) plan and has determined a mine plan that is technically achievable and 
    economically viable, and that material modifying factors have been considered. 
Cut-off parameters    A comprehensive margin ranking exercise was carried out in 2005 to determine the 
    economic limits of the deposit. These limits are still valid and are tested annually as part 
    of the LOM process. 
    For annual JORC reserves reporting purposes, detailed mine design and schedules are 
    constructed to generate detailed cash flow schedules. This work includes identifying the 
    mining sequence, equipment requirements, incremental and sustaining capital. 
    A discounted cashflow analysis is conducted to re-assess under the latest economic 
    assumptions the potential reserves remain net cashflow positive. 
Mining factors or    Kestrel is an underground mine that targets the German Creek Seam. It utilises 
assumptions    continuous mining units for in-seam development to gain access to the reserve and 
    longwall retreat to extract the majority of the reserve. 
    Material and personnel movement in and out of the mine is by drive in access via a 
    dedicated inclined transport drift; and coal clearance out of the mine is via a second 
    dedicated inclined drift. 
    The LOM assumes 375m wide longwall panels that increase to 415m in District 400 and 
    District 500. The length of longwall panels are determined by a combination of factors 
    including faults, conveyor belt drive technology and ventilation requirements. 
    All main headings and gate-road pillars have been designed to provide the required 

 

8


 

    stability with appropriate factors of safety as have barrier pillars between the longwall 
    panel take-offs and the main headings. The plan is optimised at 037.25°/217.2° panel 
    alignment to maintain 90° conveyor transfer angles as well as for in situ horizontal stress 
    for rib stability. 
    The mining dilution or loss factors are used depending on the primary roof or floor. 
    300mm of dilution or loss is used in the development and a range from 10mm–100mm 
    used for the longwall. 
    LOMs for strategic planning purposes may contain Inferred Resources, provided that the 
    LOM plan would not be compromised by non-inclusion of this coal. Inferred Resources 
    included in LOM plans retain this designation and are not to be referred to as Reserves. 
    Neither are they to be reported in JORC or Securities and Exchange Commission compliant 
    reserve statements. 
    Kestrel has only very limited Inferred coal within the existing LOM plan. 
    Site infrastructure includes coal handling and preparation plant (CHPP), co-disposal dump, 
    rail loop, mine offices, workshop, warehouse and water/sewage treatment plants. 
Metallurgical factors    The Kestrel CHPP consists of raw coal handling facilities and stockpile, coal preparation 
or assumptions    plant, product stockpile and train load-out facility and co-disposal area. 
    The CHPP produces both coking and thermal products. Yield for each product is estimated 
    from laboratory tests of exploration samples and modelled. Coal qualities modelled 
    include volatile matter, sulphur, phosphorus, crucible swelling number (CSN), fluidity, 
    dilatation, reflectance, and thermal energy. 
    During the annual reconciliation process, the actual plant performance is compared to 
    model forecast. An adjustment factor for the coke/thermal split is derived from this data 
    to increase alignment of actual and forecast results. 
Environmental    Appropriate environmental authorities and licences are in place for mining operations at 
    Kestrel. 
    The main impact of mining at Kestrel is subsidence of the surface as the area above the 
    coal seam falls in mined-out area. The land management strategy centres on protecting 
    the soil from erosion during subsidence, and working to return affected areas to 
    productive agricultural use. 
    Reject material from the CHPP is disposed of in the surface co-disposal area, which will be 
    rehabilitated prior to mine closure. 
Infrastructure    Kestrel is an operating site with existing infrastructure in place to support the operation. 
    The current LOM requires sustaining capital only to maintain the existing infrastructure. 
Costs    Based on detailed Annual Operating Plan (AOP) process. Beyond AOP, sustaining capex 
    based on $/ROMt plus equipment replacements and additions required to deliver mine 
    plan. 
    First principles estimating and aligned with AOP. Budget prices for major consumables 
    and labour. 
    Commodity prices supplied by the economics and markets team, based on expected 
    demand, current supply, known expansions, and expected incentivised supply. 
    Exchange rates supplied by the economics and markets team. 
    Transport charges obtained from coal chain team based on existing contracts and 
    expected tonnages. 
    State Government royalties are based on current QLD royalty rates. 
Revenue factors    Rio Tinto applies a common process to the generation of commodity price estimates across the 
    group. This involves generation of long-term price curves based on current sales 
    contracts, industry capacity analysis, global commodity consumption, and economic 
    growth trends. In this process, a price curve rather than a single price point is used to 
    develop estimates of mine returns over the life of the project. The detail of this process 
    and of the price point curves is commercially sensitive and is not disclosed. 
Market assessment    The supply and demand situation for coal is affected by a wide range of factors, and coal 
    consumption changes with economic development and circumstances. Rio Tinto Coal 
    Australia delivers products aligned with its Mineral Resources and Ore Reserves, these 
    products have changed over time and successfully competed with coal products supplied 
    by other companies. Price and volume forecasts are the basis for these forecasts. 

 

9


 

Economic    Economic inputs such as foreign exchange rates, carbon pricing, and inflation rates are 
    also generated internally at Rio Tinto. The detail of this process is commercially sensitive 
    and is not disclosed. 
Social    Kestrel is committed to making a sustained contribution to the social and economic 
    wellbeing of Queensland’s Central Highlands Region beyond providing over 350 direct jobs 
    at the mine site. 
    The Kestrel Mine Community Development Fund has supported many local projects since 
    its launch in 2003. The fund works with community partners on projects addressing 
    economic development, creation of employment and training opportunities and 
    enhancement of industry. 
    Local suppliers and service people are given opportunities to tender for projects related to 
    Kestrel. 
Other    Semi-quantitative risk assessments have been undertaken throughout the LOM and 
    Reserve phases. No material naturally occurring risks have been identified through the 
    above mentioned risk management processes. 
Classification    The Ore Reserves consist of 28.8% Proved Reserves and 71.1% Probable Reserves. 
    The competent Person is satisfied that the stated Ore Reserve classification reflects the 
    outcome of technical and economic studies. 
Audits or reviews    No external audits have been performed. 
    Internal Rio Tinto Coal Australia peer review processes have been completed. These 
    reviews concluded that the fundamental data collection techniques are appropriate and 
    consistent with previously audited Kestrel models. 
Discussion of relative    Rio Tinto Coal Australia operates multiple mines in QLD and NSW. The Ore Reserve 
accuracy/ confidence    estimation techniques utilised for the Kestrel Mine are consistent with those applied 
    across the other operations. 
    Reconciliation of actual production with the Ore Reserve estimate for the existing 
    operations is generally within 5% for tonnage and grade. This result is indicative of a 
    robust Ore Reserve estimation process. 
    Accuracy and confidence of modifying factors are generally consistent with the current 
    operation. 

 

 

 

 

 

 

 

10


 

Appendix 5

Winchester South Project Table 1

The following table provides a summary of important assessment and reporting criteria used at Winchester South for the reporting of exploration results and coal resources in accordance with the Table 1 checklist in The Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition). Criteria in each section apply to all preceding and succeeding sections.

SECTION 1 SAMPLING TECHNIQUES AND DATA

Criteria  Commentary 
Sampling techniques    A combination of open hole (predominantly for structural definition) and cored (for coal 
    quality (CQ), geotechnical, and gas sampling) have been used.
Drilling techniques    A total of 1,250 drill holes (133,542m) support the Resource estimate. Cored drilling 
    represents 26% of the total metres and open hole drilling 74%. The drill holes are up to 
    819m in length and average 104m. The drill holes were all nominally recorded as vertical. 
    Boreholes that deviated by more than 5% were to be re-drilled by contractor. 
    Coring has predominantly been done using a HQ3-sized (63mm) bit and open hole drilling 
    to an equivalent hole diameter size. In addition 27 large diameter (LD) holes, assumed to 
    be 200mm (8”) in diameter, have been drilled. 
Drill sample recovery    Standardised Rio Tinto Coal Australia logging systems are utilised for all drilling logging 
    and sampling. 
    Core recovery is recorded by the geologist while logging the drill hole. If core recovery for 
    a coal ply is less than 95%, then that section of the hole is redrilled to ensure a 
    representative sample is taken. 
    Ply samples are checked for representativeness using a theoretical mass that is 
    determined using analysed relative density, sample thickness and core diameter prior to 
    composite definition. 
    Open hole chip recovery is assessed qualitatively by the rig geologist. 
Logging    Core is geologically and geotechnically logged and open hole chip samples are taken every 
    1m and logged for lithology changes. Logging for lithology, grainsize, weathering and 
    hardness is conducted using standard dictionary definitions. Colour and any additional 
    qualitative comments are also recorded 
    All core is photographed on both a core table (0.5m increment) and a 5m tray basis. Chips 
    are photographed as laid out by 1m intervals. 
    All holes are logged using a comprehensive suite of downhole geophysics tools (calliper, 
    gamma, density, neutron, and sonic), with acoustic scanner (for geotechnical assessment) 
    also run on cored holes. 
Sub-sampling    Core sampling is completed at the drill site and based on set of standard criteria 
techniques and    (determined by lithology and structure). Samples are bagged at the drill site and then 
sample preparation    transported to an external accredited laboratory for analysis as a complete hole batch 
    All samples are weighed, air-dried and then re-weighed before being crushed to a 19mm 
    top size. A rotary splitter is used to divide the sample into portions (¼ for raw coal) and 
    (¾ for wash and clean coal). 
    CQ analysis is by a three-stage method involving raw analysis on all plies followed by 
    washability and product testing on composite samples as defined by the geologist. 
    All sample treatment and analysis is conducted according to procedures which adhere to 
    Australian (or International equivalent) standards in a National Association of Testing 
    Authorities certified laboratory. 
Quality of assay data    A Non-formalised quality assurance/quality control (QA/QC) involving duplicate sample is 
and laboratory tests    completed. In addition, Rio Tinto Coal Australia checks laboratory round robin and basic 
    reproducibility tests provided by the primary lab. All results are assessed via cross-plots 
    and statistics for precision and accuracy. 
Verification of    All CQ sampling and analysis is overseen and checked by other Rio Tinto personnel. 
sampling and    Data transfer from site is covered by an agreed protocol. This system documents primary 
assaying    data, data entry procedures, data verification, and data storage (physical and electronic) 
    into a geological database. 

 

1


 

Location of data    The topographic surface is derived from Lidar data processed to a vertical accuracy of 
points    0.1m within the mineral development lease (MDL) border by AAM in 2011. The digital 
    topographic model was created in Minescape with an 8m ™8mcell size triangulation at 
    0.5m decimation. 
    All surveyed co-ordinates are within Map Grid of Australia 1994 MGA Zone 55. 
    Drill hole collars were surveyed post drilling by licensed surveyors using differential global 
    positioning system with an accuracy of ±10mm. 
    Downhole surveying has been undertaken using downhole verticality and calliper tools. 
Data spacing and    Drill hole spacing for open holes is on an equilateral triangle grid of ~500m. For cored 
distribution    holes spacing is on a ~1000m or less equilateral triangle grid for undrilled areas, 
    otherwise infill drilling/redrilling of the first BP program was used. 
    All core samples are composited within defined seam boundaries. 
Orientation of data in    The Rangal Coal Measures lying within the MDL are part of the Winchester South syncline. 
relation to geological    The seams have relatively consistent layering with steeping dips on the limbs. The 
structure    orientation of drilling is therefore suitable for these stratified deposits. 
Sample security    Core samples taken at the drill site were transported daily to the Winchester South drill 
    camp for storage and placed into a freezer. Once the hole has been completed, the 
    samples are transported to the laboratory via a dedicated courier service. 
Audits or reviews    No external audits have been performed. 
    Internal Rio Tinto Coal Australia peer and technical reviews have been completed, and are 
    ongoing. 
 
 
SECTION 2 REPORTING OF EXPLORATION RESULTS 
 
 
Criteria  Commentary 
Mineral tenement 

 

Winchester South is 100% owned by Queensland Coal Pty Ltd, which is owned by Rio Tinto 
and land tenure    Coal Australia (75%) and Westfield Limited (25%), and is managed by Rio Tinto Coal 
status    Australia. 
 

 

Winchester South is defined by the boundaries of MDL 183 covering 10,952ha. The lease is 
    in good standing. 
   

 

 

2


 

Exploration done by    Only one other exploration programme has been carried out on the tenement by other 
other parties   

parties. This was by BP Coal who carried out exploration in 1981. The focus of their 

   

exploration programme was to understand the structure, geology, and CQ for a feasibility 

   

study on a low volatile thermal product. Drilling was done to ~250m spacing for cored 

   

holes and ~500m spacing for cored holes. 

Geology    Winchester South is located in Queensland near Moranbah in the northern part of the 
   

Bowen Basin which contains numerous important coal producing intervals in the Permian 

   

stratigraphy. The sequences of economic interest include the Late Permian Rangal Coal 

   

Measures and the Moranbah Coal Measures. The main rock types of these sub-groups are 

   

sandstone, siltstone with minor stratigraphic layers of conglomerate, and tuffaceous 

   

bands. 

Drill hole information    The table below provides a summary of drill hole data summary for all drilling that has 
   

been completed to-date. 

        1981-1982  2005  2010–2011  2013  2014 
     

Open holes 

825  11  107  0  1 
     

Cored holes 

204  12  73  6  11 
   

 

Since the previous resources upgrade in 2009 there have been an additional 200 
      drillholes added due to new drilling or database updates 
Data aggregation    Ply samples are combined to create composites (for washability and product coal 
methods   

analyses) representing mineable seam working sections. 

Relationship between    Based on drilling techniques and stratigraphy, the coal seam intercepts therefore 
mineralisation widths   

approximate the true coal thickness. 

and intercept lengths     

 

 

 

3


 


4


 

Balanced reporting    Not applicable. Rio Tinto Coal Australia has not specifically released exploration results for 
   

these deposits. 

Other substantive    In addition to drilling, 2D seismic lines have been completed to identify faults, folds, and 
exploration data   

possible igneous intrusions. 

Further work    Drilling into the underlying Moranbah Coal Measures for potential underground Resources 
   

is ongoing. 

 

 

 

5


 

SECTION 3 ESTIMATION AND REPORTING OF MINERAL RESOURCES

Criteria  Commentary 
Database integrity   

All drill hole data are securely stored in a database (in Brisbane) and are backed up daily. 

   

Data are validated at the drill site and also prior to loading into the database by the 

   

responsible geologist. 

   

The database contains automated validation processes which are activated during data 

   

loading and prevent un-validated data being loaded. 

Site visits   

The Resources Competent Person visited the site in 2015. 

Geological   

The deposit is well known and tabular for the Rangal Coal Measures with most major 

interpretation   

structures defined. New drill holes along with seismic has supported and refined the 

   

model. The current interpretation is thus considered to be robust. 

Dimensions   

The deposit trends 17km northwest to the southeast following the Winchester South 

   

syncline and is 9km thickness in width. The deposit extends to a depth of ~200m below 

   

the topographic surface. 

Estimation and    The Resource model was last modelled in 2013 was undertaken using resource 
modelling techniques   

modelling software (version 5.4). For structural modelling a Finite Element Method 

    (FEM) interpolator is used and for CQ an inverse distance squared interpolator is used. 
   

All surfaces and coal qualities are interpolated into grids with 50m P 50m node spacing. 

   

The models are of the coal seams only with waste modelled by default and not assigned 

   

any grade. Resource estimates are therefore of the coal plies only. 

   

Modelling is completed on an iterative basis with checking of cross-sections and contours 

   

of structural. Database values are posted on contours as a further check. A 

   

volume/tonnage check between the model and its predecessor are completed as a final 

   

validation. 

Moisture   

All tonnages are estimated on an in situ moisture basis, which is determined to be 5% 

   

This assumption was based on Hail Creek mine. 

Cut-off parameters   

Nominally coal is washed to produce three types of products: 

   

o 

7.5% air-dried ash coking product 
   

o 

10% air-dried ash coking product 

   

o 

18-25% air-dried ash thermal product. 

   

For all products, product moisture is 11%. Air-dried moisture is quoted at a 3% moisture 

   

basis. 

   

Economic resources are defined by a “break even” ($0 margin) Lerchs-Grossman 

   

optimised shell for opencast coal – this effectively sets the maximum depth or lowermost 

   

seam considered. For underground resources the limits are based on either an order of 

   

magnitude study or standard set of rules (i.e. coal below “break even” shell, less than 

   

600m deep and greater than 1.8m thick). 

Mining factors or   

Development of this Mineral Resource estimate assumes mining using standard 

assumptions   

Rio Tinto Coal Australia equipment. The assumed mining method is overburden removal 

   

via draglines, and conventional truck and shovel open-cut coal mining. 

Metallurgical factors   

It is assumed that a combination of density separation (magnetite/water) and fines 

or assumptions   

flocculation processes used by Rio Tinto Coal Australia will be applicable for the 

   

processing of Winchester South coal. 

Environmental factors   

Rio Tinto Coal Australia has an extensive environmental and heritage approval and 

or assumptions   

compliance process. No issues are expected that would impact on the Mineral Resource 

   

estimate. 

Bulk density   

The Winchester South 2013 Resource model uses average densities to determine coal 

   

mass as shown in the table below. 

     

Table 1 Average density values 

      Seam  Density 

 

6


 

 

      Upper Leichhardt Seam, L1 1.57 
      Lower Leichhardt Seam, L2  1.48 
      Upper Vermont Seam, VU  1.60 
      Lower Vermont Seam, VML  1.82 
   

Coal relative density is currently modelled at a 6% in situ moisture basis. Conversion to 

   

the in situ moisture basis has been carried out by applying the Preston and Sanders 

   

method using the equation: 

 
   

relative density (in situ) = 

RDad*(100-Mad) 
      100 RDad*(ISM-Mad)-ISM 
   

Where: Rdad = relative density, air-dried basis; Mad = moisture, air-dried basis, ISM = in situ moisture. 

Classification   

The classification of the Mineral Resources into varying confidence categories is based on 

   

a standardised process of utilising points of observation (PoO) (i.e. drill holes) according to 

   

their reliability and value in estimation. The PoO are used to categorise structure and 

   

quality continuity (or both) or support continuity. 

   

Radii of influence as determined by geostatistical analysis are then plotted around PoO 

   

maps for structure and quality. As there are many plies at Winchester South, seam groups 

    (equivalent to the seam names) were used for categorisation.
   

Areas of confidence (low, medium, high) are produced from these plots (structure and CQ 

   

for each seam group). These are finally combined to produce areas of Measured, Indicated, 

   

and Inferred which are used to subdivide the Resource tonnage estimates. 

    In summary structural radii are 250-650m for high confidence, 500-1,200m for medium 
    and 1,075-2,475m for low; and, for CQ 175-750m radii for high, 550-1350m for medium 
   

and 1,200-2,625m for low confidence respectively 

   

The Competent Person is satisfied that the stated Mineral Resource classification reflects 

   

the geological controls interpreted and the estimation constraints of the deposits. 

Audits or reviews   

No formal audits have been completed on the estimation and reporting of Mineral 

   

Resources at Winchester South to-date. 

Discussion of relative   

Rio Tinto Coal Australia operates multiple mines in New South Wales (NSW) and 

accuracy/ confidence   

Queensland (QLD). The Mineral Resource data collection and estimation techniques used 

   

for the Winchester South deposit are consistent with those applied at other deposits which 

   

are being mined, and is indicative of a robust process. 

   

Accuracy and confidence of Mineral Resource estimation estimate has been accepted by 

   

the Competent Person. 

 

 

7


 

Appendix 6

Mount Robert Project Table 1

The following table provides a summary of important assessment and reporting criteria used at Mount Robert for the reporting of exploration results and coal resources in accordance with the Table 1 checklist in The Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition). Criteria in each section apply to all preceding and succeeding sections.

SECTION 1 SAMPLING TECHNIQUES AND DATA

Criteria  Commentary 
Sampling techniques    A combination of open hole (predominantly for structural) and cored (for coal quality 
    (CQ) and geotechnical) have been used. 
Drilling techniques    A total of 1,107 drill holes (107,599m) support this maiden Resource estimate. Cored 
    drilling represents 25% of the total metres and open hole drilling 75%. The drill holes 
    are up to 518m in length and average 97m. The drill holes were all nominally recorded 
    as vertical. Boreholes that deviated by more than 5% were to be re-drilled by 
    contractor. 
    Coring has predominantly been done using a HQ3-sized (63mm) bit and open hole 
    drilling to an equivalent hole diameter size. In addition 8 large diameter (LD) holes, 
    assumed to be 200mm (8”) in diameter, have been drilled.
Drill sample recovery    Standardised Rio Tinto Coal Australia logging systems are utilised for all drilling logging 
    and sampling. 
    Core recovery is recorded by the geologist while logging the drill hole. If core recovery 
    for a coal ply is less than 95%, then that section of the hole is redrilled to ensure a 
    representative sample is taken. 
    Ply samples are checked for representativeness using a theoretical mass that is 
    determined using analysed relative density, sample thickness and core diameter prior 
    to composite definition. 
    Open hole chip recovery is assessed qualitatively by the rig geologist. 
Logging    Core is geologically and geotechnically logged and open hole chip samples are taken 
    every 1m and logged for lithology changes. Logging for lithology, grainsize, weathering 
    and hardness is conducted using standard dictionary definitions. Colour and any 
    additional qualitative comments are also recorded. 
    All core is photographed on both a core table (0.5m increment) and a 8m tray basis. 
    Chips are photographed as laid out by 1m intervals. 
    All holes are logged using a comprehensive suite of downhole geophysics tools 
    (calliper, gamma, density, neutron, and sonic), with acoustic scanner (for geotechnical 
    assessment) also run on selected cored holes. 
Sub-sampling    Core sampling is completed at the drill site and based on set of standard criteria 
techniques and    (determined by lithology and structure). Samples are bagged at the drill site and then 
sample preparation    transported to an external accredited laboratory for analysis as a complete hole batch. 
    All samples are weighed, air-dried and then re-weighed before being crushed to a 
    19mm top size. A rotary splitter is used to divide the sample into portions (¼ for raw 
    coal) and (¾ for wash and clean coal). 
    CQ analysis is by a three-stage method involving raw analysis on all plies followed by 
    washability and product testing on composite samples as defined by the geologist. 
    All sample treatment and analysis is conducted according to procedures which adhere 
    to Australian (or International equivalent) standards in a National Association of Testing 
    Authorities certified laboratory. 
Quality of assay data    A non-formalised quality assurance/quality control (QA/QC) involving duplicate sample 
and laboratory tests    is completed. In addition, Rio Tinto Coal Australia checks laboratory round robin and 
    basic reproducibility tests provided by the primary lab. All results are assessed via 
    cross-plots and statistics for precision and accuracy. 
Verification of    All CQ sampling and analysis is overseen and checked by other Rio Tinto personnel. 
sampling and     
assaying     
Location of data    The topographic surface is derived from Lidar data processed to a vertical accuracy of 

 

1


 

points    0.1m within the Mount Robert tenements by AAM in 2011. Where Lidar coverage was 
    lacking drill hole collar elevation data was used. The digital topographic model was 
    created in Minescape with an 8m ™8mcell size triangulation at 0.5m decimation. 
    All surveyed co-ordinates are within Australian Geodetic Datum 1984 MGA Zone 55. 
    Drill hole collars were surveyed post drilling by licensed surveyors using differential 
    global positioning system with an accuracy of ±10mm.
    Downhole surveying has been undertaken using downhole verticality and calliper tools. 
Data spacing and    Drilling traverses have historically been orientated across strike at a spacing of 200 – 
distribution    1,000 m, but typically around 500 m. The drill holes on each traverse are usually at 
    intervals of 50 – 100m. The length of the drill traverses ranges from 300 – 1,800 m, 
    though typically in the range of 800 – 1,200 m. 
    All core samples are composited within defined seam boundaries. 
Orientation of data in    The coal seams within the Mount Robert Project are part of the Hail Creek syncline have 
relation to geological    relatively consistent layering with a westward dipping trend that varies from 15-20 
structure    degrees in the north and steepens to 45 degrees in the south. The orientation of drilling 
    is considered suitable for these stratified deposits. 
Sample security    Core samples taken at the drill site were transported daily to the Mount Robert drill 
    camp for. Once completed week the samples are transported to the laboratory via a 
    dedicated courier service. 
Audits or reviews    No external audits have been performed. 
    Internal Rio Tinto Coal Australia peer and technical reviews have been completed, and 
    are ongoing. 
 
 
SECTION 2 REPORTING OF EXPLORATION RESULTS 
 
Criteria  Commentary 
Mineral tenement    The Mount Robert Project is owned by the Hail Creek Joint Venture (HCJV), owners of 
and land tenure    the Hail Creek Mine. The partners of the HCJV include Queensland Coal Pty Ltd (82 per 
status    cent), Nippon Steel Australia Pty Ltd (8 per cent), Marubeni Coal Pty Ltd (6.67 per cent) 
    and Sumisho Coal Development Pty Ltd (3.33 per cent). The HCJV is currently managed 
    by Rio Tinto Coal Australia. 
    The MRP area consists of 4 tenements including EPC 658, EPC 689, MDL 353 and MDL 
    435 as shown in both Table 1 and Figure 1. 
   
    An application for the consolidation of all tenements into one MDL for Mount Robert
    was submitted to DNRM on 4 November 2015. 
     

 

2


 

 

   
Exploration done by    The Mount Robert Project has had numerous companies explore the area since the 
other parties    early 1970s including The Geological Survey of Queensland, Thiess Peabody Mitsui Coal 
    Pty Ltd, Mines Administration Pty Ltd, CRA Exploration Pty Ltd, Thiess Dampier Mitsui 
    Coal Pty Ltd, BHP Mitsui Coal Pty Ltd, Thiess Pty Ltd, Australian Bulk Minerals Pty Ltd 
    and Eastern Coal Joint Venture Pty Ltd. The bulk of the drilling was aimed at the Rangal 
    and Moranbah Coal Measures. 
Geology    The Mount Robert Project is located in the north-eastern portion of the Bowen Basin, on 
    the eastern limb of the Nebo synclinorium which contains numerous important coal 
    producing intervals in the Permian stratigraphy. The sequences of economic interest 
    include the Late Permian Exmoor Formation, Moranbah Coal Measures, Fort Cooper 
    Coal Measures and Rangal Coal Measures. The main rock types of these sub-groups are 
    sandstone, siltstone with minor stratigraphic layers of conglomerate, and tuffaceous 
    bands. 
Drill hole information    A total of 1,107 drill holes support this maiden Resource estimate. Cored drilling 
    represents 280 of the total holes and open hole drilling represents 827. 
Data aggregation    Ply samples are combined to create composites (for washability and product coal 

 

3


 

methods   

analyses) representing mineable seam working sections. 

Relationship between    Based on drilling techniques and stratigraphy, the coal seam intercepts therefore 
mineralisation widths   

approximate the true coal thickness. 

and intercept lengths     
Diagrams  

 

 

 

 

4


 



 

 

   
Balanced reporting    Not applicable. Rio Tinto Coal Australia has not specifically released exploration results 
   

for these deposits. 

Other substantive    No other exploration apart from surface exploration drilling has been collected at Mount 
exploration data   

Robert. 

Further work    A further programme of surface/aerial geophysics, seismic survey and drilling has been 
   

planned but not implemented to date. 

 

6


 

SECTION 3 ESTIMATION AND REPORTING OF MINERAL RESOURCES

Criteria 

Commentary 

Database integrity    All drill hole data are securely stored in a database (in Brisbane) and are backed up 
    daily.   
    Data are validated at the drill site and also prior to loading into the database by the 
    responsible geologist. 
    The database contains automated validation processes which are activated during data 
    loading and prevent un-validated data being loaded. 
Site visits    The Resources Competent Person has not visited the project site. 
Geological    The deposit is well known and tabular for the Exmoor Formation, Moranbah Coal 
interpretation    Measures, Fort Cooper Coal Measures and Rangal Coal Measures with most major 
    structures defined. New drill holes have supported and refined the model. The current 
    interpretation is thus considered to be robust. 
Dimensions    The deposit trends 17km northwest to the southeast following the Hail Creek syncline 
    and is 9km in width. The deposit extends to a depth of ~200m below the topographic 
    surface. 
Estimation and    Modelling was undertaken in 2015 using resource modelling software. For structural 
modelling techniques    modelling a Finite Element Method (FEM) interpolator is used. For CQ an inverse 
    distance squared interpolator with search radius of 20,000m is used. All surfaces and 
    coal qualities are interpolated into grids with 50m ™ 50m node spacing. 
    The models are of the coal seams only with waste modelled by default and not assigned 
    any grade. Resource estimates are therefore of the coal plies only. 
    Modelling is completed on an iterative basis with checking of cross-sections and 
    contours of structural. Database values are posted on contours as a further check. A 
    volume/tonnage check between the model and its predecessor are completed as a final 
    validation. 
Moisture    All tonnages are estimated on an in situ moisture basis, which is estimated as 5%. This 
    assumption was based on the adjacent Hail Creek mine.
Cut-off parameters    Based on the adjacent Hail Creek Operation it is expected that coal from Mount Robert 
    would be is washed to produce three types of products:
    o  a premium low-ash (8.5 per cent) prime hard coking product 
    o  a higher ash (10 per cent) hard coking product. 
    In addition a 23% air-dried ash thermal product would be expected. Since semi- 
    anthracite coal occurs within the Moranbah Coal Measures this would be expected as an 
    additional product. More work into specifications and marketing is required before this 
    type of product coal is defined. 
    For all Hail Creek products, product moisture is 11%. Air-dried moisture is quoted at a 
    3% moisture basis. 
    Economic resources are defined by a “break even” ($0 margin) Lerchs-Grossman 
    optimised shell for opencast coal – this effectively sets the maximum depth or 
    lowermost seam considered. For underground resources the limits are based on either 
    an order of magnitude study or standard set of rules (i.e. coal below “break even” shell, 
    less than 600m deep and greater than 1.8m thick). 
Mining factors or    Development of this maiden Mineral Resource estimate assumes mining using standard 
assumptions    Rio Tinto Coal Australia equipment. Due to the steep dips at Mount Robert the assumed 
    conventional truck and shovel open-cut coal mining. 
Metallurgical factors    It is assumed that a combination of density separation (magnetite/water) and fines 
or assumptions    flocculation processes used by Rio Tinto Coal Australia at the adjacent Hail Creek 
    Operation will be applicable for the processing of Mount Robert coal. 
Environmental factors    Rio Tinto Coal Australia has an extensive environmental and heritage approval and 
or assumptions    compliance process. No issues are expected that would impact on the Mineral Resource 
    estimate. 

 

7


 

Bulk density    In some areas, for some plies, there is limited borehole data which are reported as 
    relative density (RD). 
    The in situ relative density; i.e. the density of materials at an in situ moisture basis, was 
    calculated using the Preston and Sanders equation: 
   

RD2=[RD1*(100-M1)]/[100+RD1*(M2-M1)-M2] 

    Where analysed density is not available a default in situ density of 1.4 g/cc is used. 
Classification    The classification of the maiden Mineral Resources into varying confidence categories is 
    based on a standardised process of utilising points of observation (PoO) (i.e. drill holes) 
    according to their reliability and value in estimation. The PoO are used to categorise 
    structure and quality continuity (or both) or support continuity. 
    Radii of influence are then plotted around PoO maps for structure and quality. The radii 
    of influence were determined by consideration of the perceived and observed variability 
    in structure and CQ for seam groups, and by examining histograms and statistics of ash 
    content of the seam groups. As there are many plies at Mount Robert, seam groups 
    (equivalent to the seam names) were used for categorisation. 
    Areas of confidence (low, medium, high) are produced from these plots (structure and 
    CQ for each seam group). These are finally combined to produce areas of Measured, 
    Indicated, and Inferred which are used to subdivide the Resource tonnage estimates. 
    In summary structural radii are 250m for high confidence, 500m for medium and 1,500- 
    2,000m for low; and, for CQ 250-500m radii for high, 500-1,000m for medium and 
    2,000-3,000m for low confidence respectively 
    The Competent Person is satisfied that the stated Mineral Resource classification 
    reflects the geological controls interpreted and the estimation constraints of the 
    deposits. 
Audits or reviews    No formal audits have been completed on the estimation and reporting of Mineral 
    Resources at Mount Robert to-date. 
Discussion of relative    Rio Tinto Coal Australia operates multiple mines in New South Wales (NSW) and 
accuracy/ confidence    Queensland (QLD). The Mineral Resource data collection and estimation techniques 
    used for the Mount Robert deposit are consistent with those applied at other deposits 
    which are being mined, and is indicative of a robust process. 
    Accuracy and confidence of Mineral Resource estimation estimate has been accepted 
    by the Competent Person. 

 

 

 

 

 

 

8