-----BEGIN PRIVACY-ENHANCED MESSAGE----- Proc-Type: 2001,MIC-CLEAR Originator-Name: webmaster@www.sec.gov Originator-Key-Asymmetric: MFgwCgYEVQgBAQICAf8DSgAwRwJAW2sNKK9AVtBzYZmr6aGjlWyK3XmZv3dTINen TWSM7vrzLADbmYQaionwg5sDW3P6oaM5D3tdezXMm7z1T+B+twIDAQAB MIC-Info: RSA-MD5,RSA, NRu3lG159T7wh+KUfHAJXGZmAT+VUemZyfDQQCg4hG//+G5Jj8W+vSucaqjEMICA Hnl2VZHf8rRuaK7/f7FDqw== 0001144204-09-053784.txt : 20091020 0001144204-09-053784.hdr.sgml : 20091020 20091020172021 ACCESSION NUMBER: 0001144204-09-053784 CONFORMED SUBMISSION TYPE: 8-K PUBLIC DOCUMENT COUNT: 5 CONFORMED PERIOD OF REPORT: 20091020 ITEM INFORMATION: Regulation FD Disclosure ITEM INFORMATION: Financial Statements and Exhibits FILED AS OF DATE: 20091020 DATE AS OF CHANGE: 20091020 FILER: COMPANY DATA: COMPANY CONFORMED NAME: ROWAN COMPANIES INC CENTRAL INDEX KEY: 0000085408 STANDARD INDUSTRIAL CLASSIFICATION: DRILLING OIL & GAS WELLS [1381] IRS NUMBER: 750759420 STATE OF INCORPORATION: DE FISCAL YEAR END: 1231 FILING VALUES: FORM TYPE: 8-K SEC ACT: 1934 Act SEC FILE NUMBER: 001-05491 FILM NUMBER: 091128605 BUSINESS ADDRESS: STREET 1: 2800 POST OAK BLVD. STREET 2: SUITE 5450 CITY: HOUSTON STATE: TX ZIP: 77056-6127 BUSINESS PHONE: 7136217800 MAIL ADDRESS: STREET 1: 2800 POST OAK BOULEVARD STREET 2: SUITE 5450 CITY: HOUSTON STATE: TX ZIP: 77056-6127 FORMER COMPANY: FORMER CONFORMED NAME: ROWAN DRILLING CO INC DATE OF NAME CHANGE: 19711110 FORMER COMPANY: FORMER CONFORMED NAME: ROWAN DRILLING CO DATE OF NAME CHANGE: 19671112 8-K 1 v163309_8k.htm
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 8-K

CURRENT REPORT
Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934

Date of Report (Date of earliest event reported): October 20, 2009
 
ROWAN COMPANIES, INC.
(Exact name of registrant as specified in its charter)

 DELAWARE
 1-5491
 75-0759420
 (State or other jurisdiction
 (Commission file Number)
 (IRS Employer
 of incorporation)
 
 Identification No.)
            
 2800 POST OAK BOULEVARD
 
 SUITE 5450
 
 HOUSTON, TEXAS
 77056
   (Address of principal executive offices)
   (zip code)

(713) 621-7800
(Registrant’s telephone number, including area code)

Check the appropriate box below if the Form 8-K is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions:

¨ Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)

¨ Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 14a-12)

¨ Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240-14d-2(b))

¨ Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240-13e-4(c))

 
 

 

Item 7.01. Regulation FD Disclosure

The following information is furnished pursuant to Item 7.01:

    The Offshore and Land Rig Fleet and Contract Status Reports for Rowan Companies, Inc., each as of October 20, 2009, is attached as Exhibit 99.1 and 99.2.

Item 9.01. Financial Statements and Exhibits

(c) Exhibits

Exhibit
   
Number
 
Exhibit Description
     
99.1
 
Offshore Rig Fleet and Contract Status at October 20, 2009
     
99.2
 
Land Rig Fleet and Contract Status at October 20, 2009

SIGNATURES
 
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.
 
 
ROWAN COMPANIES, INC.
 
       
 
By:
/s/ William H. Wells
 
   
William H. Wells
 
   
Vice President - Finance and CFO
 
   
(Principal Financial Officer)
 
Dated: October 20, 2009
 
 
2

 

EXHIBIT INDEX

Exhibit
   
Number
 
Exhibit Description
     
99.1
 
Offshore Rig Fleet and Contract Status at October 20, 2009
     
99.2
 
Land Rig Fleet and Contract Status at October 20, 2009


 
 

 
EX-99.1 2 v163309_ex99-1.htm Unassociated Document
 
OFFSHORE RIG FLEET AND CONTRACT STATUS
 
As of October 20, 2009
 


OFFSHORE RIGS
                                
Contract Status
     
     
LeTourneau
  
Depth (feet)
  
Year in
              
Day Rate
  
Estimated
     
Name
  
Class
  
Water
  
Drilling
  
Service
  
Location
  
Customer
  
(in thousands)
  
Duration
  
Comments ($ in thousands)
Cantilever Jack-up Rigs:
                               
Rowan EXL #4
 
S116-E
 
    350
 
     35,000
 
2012
 
TBD
 
TBD
 
TBD
 
TBD
 
Rig currently under construction with delivery expected in Q1 2012.
Rowan EXL #3
 
S116-E
 
    350
 
     35,000
 
2010
 
TBD
 
TBD
 
TBD
 
TBD
 
Rig currently under construction with delivery expected in Q4 2010.
Joe Douglas
 
240-C
 
    400
 
     35,000
 
2011
 
TBD
 
TBD
 
TBD
 
TBD
 
Rig currently under construction with delivery expected in Q3 2011.
Rowan EXL #2
 
S116-E
 
    350
 
     35,000
 
2010
 
TBD
 
TBD
 
TBD
 
TBD
 
Rig currently under construction with delivery expected in Q3 2010.
Rowan EXL #1
 
S116-E
 
    350
 
     35,000
 
2010
 
TBD
 
TBD
 
TBD
 
TBD
 
Rig currently under construction with delivery expected in early Q2 2010.
Ralph Coffman
 
240-C
 
    400
 
     35,000
 
2010
  
Gulf of Mexico
  
McMoRan
  
Low 180s
  
January 2012
 
Signed two-year contract in June 2009 (see Rowan Mississippi); rig is currently under construction with delivery expected in early 2010.
J.P. Bussell
 
225-C
 
    300
 
     35,000
 
2008
 
Egypt
 
Shell
 
Low 180s
 
May 2011
 
Rig completed mobilization from Gulf of Mexico to Egypt in early October and commenced contract for two wells (estimated 20-24 months) in mid October 2009.
Rowan-Mississippi
 
240-C
 
    375
 
     35,000
 
2008
 
Gulf of Mexico
 
McMoRan
 
Low 180s
 
November 2010
 
In connection with the Ralph Coffman contract, the Company entered into an amendment in June 2009 to reduce the Mississippi day rate for the remainder of the contract term.  The Coffman contract contains an early termination option exercisable on or before December 31, 2009.  Should McMoRan terminate the Coffman contract, the Company will earn an $18 million fee, payable in installments over the remainder of the Mississippi contract term.
Hank Boswell
 
225-C
 
    300
 
     35,000
 
2006
 
Middle East
 
Saudi Aramco
 
Low 190s
 
March 2011
   
Bob Keller
 
225-C
 
    300
 
     35,000
 
2005
 
Middle East
 
Saudi Aramco
 
Low 180s
 
May 2011
   
Scooter Yeargain
 
225-C
 
    300
 
     35,000
 
2004
 
Middle East
 
Saudi Aramco
 
Low 190s
 
March 2011
   
Bob Palmer
 
224-C
 
    550
 
     35,000
 
2003
 
Gulf of Mexico
 
LLOG
 
Low 80s
 
November 2009
   
Rowan Gorilla VII
 
219-C
 
    400
 
     35,000
 
2002
 
West Africa
 
Cabinda
 
Low 330s
 
April 2010
   
Rowan Gorilla VI
 
219-C
 
    400
 
     35,000
 
2000
 
North Sea
 
BG
     
October 2009
 
Rig arrived at the shipyard in mid July for upgrades in connection with Norwegian certification requirements, which are expected to be completed by late October.  Rig received low $150s shipyard rate for first 60 days, through late September.
                       
BG
 
Mid 370s
 
January 2010
   
                           
Mid 380s
 
June 2010
   
Rowan Gorilla V
 
219-C
 
    400
 
     35,000
 
1998
 
North Sea
 
Total
 
Low 180s
 
July 2010
   
Rowan Gorilla IV
 
200-C
 
    450
 
     35,000
 
1986
 
Mexico
 
PEMEX
 
Low 130s
 
July 2011
 
The day rate reprices every three months based on an index of jack-up rates.  The rate shown dates from the rig's mid August start-up. The next date on which the contract is expected to reprice is October 30, 2009. A late delivery penalty of $1.6 million was withheld from the customer's initial payment.  Rig was idle for 8 days during September 2009.
Rowan Gorilla III
 
200-C
 
    450
 
     30,000
 
1984
 
Eastern Canada
 
EnCana
     
October 2009
 
Rig arrived in the shipyard in mid October for modifications and inspections and is expected to commence operations  for EnCana in late October 2009.
                       
EnCana
 
Mid 300s
 
June 2010
   
Rowan Gorilla II
 
200-C
 
    450
 
     30,000
 
1984
 
Gulf of Mexico
 
Devon
 
Low 190s
 
January 2011
   
Rowan-California
 
116-C
 
    300
 
     30,000
 
1983
 
Middle East
 
Available
         
Rig was in the shipyard during the month of September 2009 for maintenance/modifications and is expected to remain in the shipyard until mid December 2009.
Cecil Provine
 
116-C
 
    300
 
     30,000
 
1982
 
Gulf of Mexico
 
Available
          Rig was idle during the month of September 2009.
Gilbert Rowe
 
116-C
 
    350
 
     30,000
 
1981
 
Middle East
 
Maersk
 
Low 100s
 
March 2010
   
Arch Rowan
 
116-C
 
    350
 
     30,000
 
1981
 
Middle East
 
Available
         
Rig was in the shipyard during the month of September 2009 for maintenance/modifications and is expected to remain in the shipyard until mid December 2009.
Charles Rowan
 
116-C
 
    350
 
     30,000
 
1981
 
Middle East
 
Available
         
Rig was in the shipyard during the month of September 2009 for maintenance/modifications and is expected to remain in the shipyard until mid December 2009.
Rowan-Paris
 
116-C
 
    350
 
     30,000
 
1980
 
Middle East
 
Maersk
 
Low 170s
 
January 2010
 
Rig was idle for 12 days during September 2009.
Rowan-Middletown
 
116-C
 
    350
 
     30,000
 
1980
 
Middle East
 
Available
         
Rig was in the shipyard during the month of September 2009 for maintenance/modifications and is expected to remain in the shipyard until the end of November 2009.
Conventional Jack-up Rigs:
                               
Rowan-Juneau
 
116
 
    250
 
     30,000
 
1977
 
Gulf of Mexico
 
Available
         
Rig was idle during the month of September 2009.
Rowan-Alaska
 
84
 
    350
 
     30,000
 
1975
 
Gulf of Mexico
 
Available
         
Rig was idle during the month of September 2009.
Rowan-Louisiana
 
84
 
    350
 
     30,000
 
1975
 
Gulf of Mexico
 
Helix-ERT
 
Mid 30s
 
December 2009
 
Rig was idle during the month of September 2009.


Rig Class denotes LeTourneau, Inc. hull number. 200-C is a Gorilla class unit designed for extreme hostile environment capability. 219-C is a Super Gorilla class unit, an enhanced version of the Gorilla class, and 224-C is a Super Gorilla XL design. 225-C is a Tarzan Class unit.  240-C is LeTourneau's latest jack-up design.  Rowan EXL is an enhanced version of the Super 116E class.  Unless otherwise indicated, all day rates include estimated amortization of contract mobilization/modification revenues. Estimated contract durations reflect either stated drilling periods or expected time required for the contracted well or wells.

ROWAN HEREBY ADVISES THAT THE TABLE SET FORTH ABOVE MAY CONTAIN INACCURATE, INCOMPLETE AND/OR INCORRECT INFORMATION AND IS SUBJECT TO CHANGE AT ANY TIME.
THE INFORMATION SHOULD NOT BE RELIED UPON FOR ANY PURPOSE, AND ROWAN HEREBY DISCLAIMS ANY LIABILITY RELATING TO THE USE OF THE INFORMATION SET FORTH ABOVE.

This report contains forward looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, including, without limitation, statements as to the expectations, beliefs and future expected financial performance of the Company  that are based on current expectations and are subject to certain risks, trends and uncertainties that could cause actual results to differ materially from those projected by the Company. Relevant factors have been disclosed in the Company's filings with the U. S. Securities and Exchange Commission.
 

Revisions to Fleet Status Report Noted in Bold

 
 

 
GRAPHIC 3 logo.jpg GRAPHIC begin 644 logo.jpg M_]C_X``02D9)1@`!`@``9`!D``#_[``11'5C:WD``0`$````9```_^X`#D%D M;V)E`&3``````?_;`(0``0$!`0$!`0$!`0$!`0$!`0$!`0$!`0$!`0$!`0$! M`0$!`0$!`0$!`0$!`0("`@("`@("`@("`P,#`P,#`P,#`P$!`0$!`0$"`0$" M`@(!`@(#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,# M`P,#`P,#`P,#_\``$0@`)P`J`P$1``(1`0,1`?_$`*````,``@,````````` M``````@)"@('`P0%`0`"`@,!`0`````````````$!P4&`@,(``$0```'``$" M`P0(!`<```````$"`P0%!@<($1(`,1,A(C()87&A8C,4%1?A4B,XDN)39!96 M5Q$``0,"!0($!0$%"0```````0(#!!$%`"$2!@(\O-H;4@)(2'`E`'\11I0^=*D?0XVD+[6EO-1PE_1?FAZ8_NE]8\< M,8SRZYI0K-+TC]S='TF8JS6ZVNM*"QM!Z?#5ZKSZZE;A98BC('KE5(SE9!3T MB"4`'PL^4N'MTQMB;N>NDGD&;&0\J%;HGJEH2JG;2LEYL)4I)!TTZ=<7 M>RB5/J'@=WE[F=;C/_@>)9TW9#@J MJ5-);FE)_(I0AS0E0'X`I-#2NJF<['V9M0H4B=KW'6BQQ30I3R4E4&4S$NJ\WF%F9!<(QZZY MTUC_`-,BH`)!&'C>Y'C,;UC[+W3"W'M^\370AH3HZ3';<.02IU*AJJ:C5I3\ ML1TO8$E48O0GD.,IZBN?[/+%"N(['1-]RBB;'FLRA/TC0Z]'6.OR"1R"H5M( M-R*GCWZ8'$6LO&N.]!T@(]R*Z9BCY>'_`"H3\)PQIGWK`KJ`HE23F%)S-4D4 M(/CA>O-=APLT(*30XVIU^Z/P]W^7S^+P'VXWEX8UUPBOYGNJW:3Y`XWQF3OE MGIF0VG&M#T[0H:DS#JLS=_>P5FK]9BZW-V2*%O/QU2;H2BJSE%FX1_-*="&, M8H=/"XYZW]NKB?@YS?.P6VSO*;=F;;"<=::>[;SVG\6'DK;4L!8()149%)&+ MYQO;+9=[JZU=6RY&C)U*^Y2:CRJ"*8G.)R1L6G1"RW%_"W'GMJX=1 MSESM*:N/-E[[+TF8X$KE>H6DD1F&W-3382#110D4TCP2*2E[N]QW!&.ZWY@XC$0DI5Y+D=-L4)9L:)GX6NY4A&U01:N MG"9V2;*6I]B>I1H+&,DH`.134(F0G;VAT`J^;K]VUS,>?LWCAE.WIB>[',NZ M)1*D-&B@XEH/@HU)%4@)`&`;?8-KM-+7<9RDS,Q31J^[P^ZAIGXURQJCD3L= MYJ]8SK<,D:9W::HO:YM[>=$I<8:OK7=M/.VY(ZO7&F("WK\4Y9O4UD@D6Z*9 MT53I(@FV0*5,QVP)_&WNADWCA+E.SJL_)$=A8<@2%*#\9:`G_=,RTD/D`D*( M2X00X*Y$8&E1I^VBB;;I95!40O$#1L5N4OG^;W_?DXW6P6JS+E6I]P5>[""XINCZ_WSJ"E!0$*6I`H=(Q(;HCVF3MY MC<$1H^J<<[:R%*I]H&=*TZGRQ;!W$^CR[?(O^'ZOL\.'2YY#IA:5^!^F)*^: M#K0XKG?R?::N#E.[V*LQ0\>GRW>:)<<=D(=NFRCZ@IT!!LY87Y5X:<3*`+F> M*)*'ZD[!+S;[F&[ZUOCBZ\*5W.(XEX2[<4)KI$\+(0XL'(T2&@E/B$UU9X<' M'QABTW`).F9VNOBK+(?#]N%!?+GCI.IGU(UK@I2'G[04KR!D9B.79!-0S!:0 M;RKB)7=%34=(-94XF7$H#T[@,'4H@(O'^K$S=;IQYM&Y6))5LQJZQERBW51" MGVU*0M032B5(U43\:5P/Q9>,D[IW1/LF\X5EBOP+?%7V6[@AH*=[:W.XM/WZ%-E.G,&E16H"8U2C?+LLZ03[&[-K37).R$D8TKAZT+ M/S3A$4(V/2%,SIJM#N42$7`R8>DH0QQ]@>..-M;TY%Y&_JI.256:1:&K5%>A MR4Z-*_2(2C2X^L**"%H[9*ZDYBB3B>NMH@,\>LJC'NNA"`Z(IVE_H/_\`/U?E_P!;RZ=?AUPKOYA`\CTK^O\`A_:F`L^< M#QWW&Y7KCWR$R/-YG5(/+:SJ-'TBLT=NT?Z!$0=X5KLJPMD)`+K-WEE91SNN M"DY;-#*.4P5]0B9O:`H;E?8+)LZXQ;7>3_,%E$!Q)!(!5F?@,(FKLE3IIN:QL8Z=?UM9:4P76LD)TJJE1\\3]PMDR)K<;6*_$S5?BTN,[FOV4HC/%1>O:DYGBJ,2K)%M]'>UOU2.!. ML9JH455DBNDNTIBD,0XC;A]D5HY!W+#W+:][[Q6FT%*(*FI'<<:03_!EA)"& MT5)"`L&@RZXRC;_>MK*X#D$J<I9;44BK)-4T`(!2<:F+?NG=RDL1 MV5L6YH@J!.D`#KUZ_IA@/%'CY;=PT'CD?$:7.(X)A>T1FA7/?[4FWB8.SRU` M223=..1_J=AS=/'/'#&Q^2V.4MP^YGF]],7?V>'+ZF/_F/T.%;Z:/Y#Z8Q.F3M`"G' MN*;J40./41Z``A[H@81Z!]?C&2A;J!H(2\/Q\OC\\?7$]P@DZ3B?SD7P8XG: M=R"U?3,KY]9QQ_M-GLQ3;CFJ4EC]^C&NI,E)RJD//6R)E*1<'S!-N:18+ M"8JJG:L*)#&$3+#E6T<#[E7;X_-C,9%YBM+3'6JZ-6QQQM1254#B:OT4``L$ M:1D%<$47Z=HID$0$%A)X#X M@W*\U<-J[^O&WMO(I6(W(9FI6D$52B0)36DJ&07H.DG50TQ98.[9;04+A:EN M3=/VDMJ!U^&137K3PP:T!P'K\G7RM]!^9=7BM7[!?_G$=FD3BE6BOT59H?\` M5HFMV:1EYRQ0<<2,]5,9!10SD$1%3W!\B['LWV5;?W/;Y-L%HE[RB3*0?7WV M._(>FA1TN!G65./%6H]M(*M65*C'ANODE3+C;-ND)B*2=93'S2:QKV*L,<[?,YINY22[S. MDUE`74$QQ,(CXZCO+MUDW%Z3=]2;@M>IY*DE!"SU&DA)%!2@H,L*9P'N+*B2 8LK)-?!1.8^=>N-N>SZ/X>(K[/AC#'__9 ` end GRAPHIC 4 logo1.jpg GRAPHIC begin 644 logo1.jpg M_]C_X``02D9)1@`!`@``9`!D``#_[``11'5C:WD``0`$````9```_^X`#D%D M;V)E`&3``````?_;`(0``0$!`0$!`0$!`0$!`0$!`0$!`0$!`0$!`0$!`0$! M`0$!`0$!`0$!`0$!`0("`@("`@("`@("`P,#`P,#`P,#`P$!`0$!`0$"`0$" M`@(!`@(#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,# M`P,#`P,#`P,#_\``$0@`,P`V`P$1``(1`0,1`?_$`'D```$%`0`#```````` M``````8`!P@)"@0!`PL!`0`````````````````````0```&`@$"`@0-`P4! M``````(#!`4&!P$("0`2$1,A=A=G,2(4%36UU18F-U>7M_!!42,S)*<8"A$! M`````````````````````/_:``P#`0`"$0,1`#\`VPU71E)JZV@JI53]7J%* MB*LARA0?`8J:<><8A)&8:<:-J$,PPP8LY$+.Q+[)Z!>P2C/T9JK]O8E]D]`O8)1G MZ,U5^WL2^R>@#)/15)%/E=`*IZKBP*9BO)4!!`(J$)Y(:_G*C!1V`M6,&%X/ M3EC\,^..\`<_#C'0.14?Y7U_ZHL/U>1T%1G_`-%,GDT.X@]KY##Y'(8G(4*: ML<('V+/;E'7U'\IMN#I5`4#PT*4;@C&J3'#*%DLP/B$><9]&<]!FOJI]N".O MG)_'J30[<:F511'%5/7C8/7W:_9=\MNSI'=D_A3B^4[(1R;KWA;!I!%9$KP8$]M,*3`)4EE9!V=V#`+-&]<$F[VEJ/E M5N[?ZV-;]S9+M!-9-_Z$=KF>FRIJ6C\&N]?"&/74ZG'V:QNHLP5SC[84W#0+ MDX%!QZX&>\?H`,-CR(>34:0S*DE;DQ*0/*Q,$(4ZO(R@"RI("$PX(23_`![P MXP,6,!SCTY^'H!*5_3]9^NKA_',^Z#BJ/\KZ_P#5%A^KR.@Q\\EO.]1%WP+= M[42[^.^][,UWH^XT%*W984(V&@L%!E_8)[Y\(4IL?,XI.U!E3]$LC3%E%J,B M`286,7H%G`1FN/E-UTO"RU]O3;B8VB:)5.]%45'2I^8MNJPA\:G6HMXJ5<>@ M)\S581E,"]PD3R$TF+*%1I;ME<7VIRQ9#V]`W^J6].H>G,GK796O.)+:V;21 MG:"ZOHF?WAOE!KA%7S>Y)(@WJH543++G-:CACA\W3]E)6)D:$E6A3.103?(+ M$/&`&9)MAI4]7U9DE=>(3;%$EA\^<]G+IUE2;XP!MU3:[*AT]31&1VM8-,%+ MPP!&^,MF&$IG).8,M.!R,!YR7M&'.0TY\97->5R&;-7!JJ]Z>VAJY/*6JQOL MU\)L:9QU_,4M[D^Q]G:D"-M9&9!_QG)!(2%Z1<6<1T'STMC^,?D`?+EY-XJJX^MG+%KW:7QKXYH)%4&6E M]9)^*KP"A<>(53;+BB7LR6L2@%JU@QEG?*Q=P<>7CN"3D^T8Y([%L'<6:2'C M-W)4AVVJ>U:K&`#_`*QH%=>,]B7BP7(T)$!#0_M[<_IHGEI4HA*U?BX.(UOF M&C"$@`!!;YP.:N[ZP/D-O.^-J]2)MK/6O_A^GM::G!*'R,R$(V6DU]?1:)LS M@\,SRL5N\J71N-FN"]2),0GR>,8"L!+"6#H-8LK^GZS]=7#^.9]T'%4?Y7U_ MZHL/U>1T&$RBMCKTU"Y"-J=Q9U<-B/NH%K+%D[LW7GJ_+KQG<8D1KPC>GA4UN4K@WSKW(5YY9AY2,!(:9ZM\G&RW'W/MZJZ>+1?[UWEV.K_`&+LG6*(75(*[D!''U'"G`RO-8JA MDY3F2D@\E?HF>E1C,*\HT&!V+V,U?6<+?($SZ9,NX&J%VU M;;>MS=L/KI?%MW*XVK1\K=+$9&I,1%'R:35]=F^/S%$E4EFFMJQ,2L.*SDY. M4+..X+X.(2J(%$GF;RV.:7[RZO/SA6<);7"5;8WK)+6BUCD.!Q;FK%!&9VNZ MTD;0X)ER(*D\_"-N-R0H"#&>W(BPAJLDU[W=ULE#G8TA@>]EYRG8:QUC@[,.9!";'DBEB7D.%:+BHZ`AD M)CSC'4YR+Y24L,#GO"8,8!Y#T!4R\4E",?&2Y<5R68VB;1#I!'VOU$O4.[`* MSPM,@F2F;K%);L".@8<+P.BH18!9;\@P3X8R'.?C=`[4ZTA)?]9:8UJK79/9 M37A-1+!!XY#K.I*:L462C3-80X`8+Q%G.`=@2@UXX_9I0#\'NJ_KQZ#S^(_>#_U7_7CT"_$?O!_M^E?0+\1^\'X?=7T"_$?O!^'W5]` I&2?[P_/E=>/W\\?OBO[?,]EW=X^SZ<_[/9Z/,[?'Q[_B]G=_?MZ#_]D_ ` end EX-99.2 5 v163309_ex99-2.htm Unassociated Document

 
ROWAN COMPANIES, INC.
 
 
LAND RIG FLEET AND CONTRACT STATUS
 
 
As of October 20, 2009
 
 

ONSHORE RIGS
         
Maximum
     
Contract Status
   
       
Horsepower
 
Drilling
         
Estimated
   
Name
 
Type
 
Drawworks
 
Mud Pumps
 
Depth (feet)
 
Location
 
Customer
 
Duration
 
Comments
                                                 
Rig 9
  
Diesel electric
  
        2,000
  
          3,200
  
       20,000
  
Texas
  
Available
           
Rig 12
  
SCR diesel electric
  
        1,500
  
          2,600
  
       18,000
  
Texas
  
Available
           
Rig 14
  
AC electric
  
        3,000
  
          3,200
  
       35,000
  
Texas
  
Available
           
Rig 15
  
AC electric
  
        3,000
  
          3,200
  
       35,000
  
Texas
  
Available
           
Rig 18
  
SCR diesel electric
  
        2,000
  
          4,400
  
       25,000
  
Texas
  
Available
           
Rig 26
  
SCR diesel electric
  
        2,000
  
          4,800
  
       25,000
  
Texas
  
Available
           
Rig 29
  
Mechanical
  
        1,500
  
          2,600
  
       18,000
  
Texas
  
Available
           
Rig 30
  
AC electric
  
        2,000
  
          2,600
  
       20,000
  
Texas
  
BBX
  
December 2009
     
Rig 31
  
SCR diesel electric
  
        3,000
  
          4,400
  
       35,000
  
Texas
  
Available
           
Rig 33
  
SCR diesel electric
  
        1,500
  
          3,200
  
       18,000
  
Texas
  
Available
           
Rig 34
  
SCR diesel electric
  
        2,000
  
          4,400
  
       25,000
  
Texas
  
Available
           
Rig 35
  
SCR diesel electric
  
        1,500
  
          4,400
  
       18,000
  
Texas
  
Cabot
  
July 2010
     
Rig 51
  
SCR diesel electric
  
        2,000
  
          4,400
  
       25,000
  
Texas
  
Newfield
  
June 2010
     
Rig 52
  
SCR diesel electric
  
        2,000
  
          4,400
  
       25,000
 
Texas
 
Available
     
Prior customer will pay a reduced rate through late October 2009.
Rig 53
 
SCR diesel electric
 
        2,000
 
          4,400
 
       25,000
 
Texas
 
Krescent
 
October 2009
   
Rig 54
 
SCR diesel electric
 
        2,000
 
          4,400
 
       25,000
 
Texas
 
Available
     
Prior customer will pay early termination fee equal to reduced rate through mid October 2009.
Rig 59
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Louisiana
 
EnCana
 
August 2012
   
Rig 60
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
Devon
 
April 2011
 
Rig is currently stacked at a reduced rate.
Rig 61
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
EnCana
 
June 2015
   
Rig 62
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
Devon
 
March 2011
 
Rig is currently stacked at a reduced rate.
Rig 63
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
EnCana
 
November 2014
   
Rig 64
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
Available
       
Rig 65
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
Pioneer
 
November 2009
 
Rig is currently stacked at a reduced rate.
Rig 66
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
PetroQuest
 
December 2009
   
Rig 67
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
ConocoPhillips
 
January 2010
   
Rig 68
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Alaska
 
Pioneer
 
March 2010
 
Rig is currently stacked at a reduced rate.
Rig 76
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Louisiana
 
EnCana
 
April 2011
   
Rig 77
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
EnCana
 
December 2012
   
Rig 84
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
EnCana
 
May 2011
   
Rig 85
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
Common Resources
 
October 2010
   
Rig 86
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
EnCana
 
February 2012
   
Rig 87
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
Common Resources
 
May 2012
   

Rigs 9 through 35 were constructed at various dates between 1960 and 1982, utilizing new as well as used equipment, and have since been substantially rebuilt.  Rigs 51, 52, 53 and 54 were constructed during 2001-02. Rigs 59 through 66 were completed during 2006, Rigs 67 through 77 during 2007, Rigs 84 and 85 in 2008 and Rigs 86 and 87 in 2009.  All but Rig 29 are equipped with a top-drive drilling system.  Day rates range from $9,000 (standby rate) to $27,000. Estimated contract durations reflect either stated drilling periods expected time required for the contracted well or wells.  Estimated number of idle days during September 2009 was 392 (59% utilization).

ROWAN HEREBY ADVISES THAT THE TABLE SET FORTH ABOVE MAY CONTAIN INACCURATE, INCOMPLETE AND/OR INCORRECT INFORMATION AND IS SUBJECT TO CHANGE AT ANY TIME.
THE INFORMATION SHOULD NOT BE RELIED UPON FOR ANY PURPOSE, AND ROWAN HEREBY DISCLAIMS ANY LIABILITY RELATING TO THE USE OF THE INFORMATION SET FORTH ABOVE.
 
This report contains forward looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, including, without limitation, statements as to the expectations, beliefs and future expected financial performance of the Company that are based on current expectations and are subject to certain risks, trends and uncertainties that could cause actual results to differ materially from those projected by the Company. Relevant factors have been disclosed in the Company's filings with the U. S. Securities and Exchange Commission.
    

Revisions to Fleet Status Report Noted in Bold
 

-----END PRIVACY-ENHANCED MESSAGE-----