Operations

Note 8 – Gabon

We are the operator of the Dussafu PSC with a 66.667 percent ownership interest. Located offshore Gabon, adjacent to the border with the Republic of Congo, the Dussafu PSC covers an area of 680,000 acres with water depths up to 3,000 feet.

The Dussafu PSC partners and the Republic of Gabon, represented by the Ministry of Mines, Energy, Petroleum and Hydraulic Resources, entered into the third exploration phase of the Dussafu PSC with an effective date of May 28, 2012. The Direction Generale Des Hydrocarbures (“DGH”) agreed to lengthen the third exploration phase to four years until May 27, 2016.  All expenditure commitments on this exploration phase have been completed.

 

Geoscience, reservoir engineering and economic studies have progressed and a field development plan was approved by the DGH on October 10, 2014, for a cluster field development of both the Ruche and Tortue discoveries along with existing pre-salt discoveries at Walt Whitman and Moubenga.  Central/Inboard 3D seismic data acquired in 2011 has been processed and interpreted to evaluate prospectivity. We have also completed processing data from the 1,260 sq. km 3D seismic survey acquired during the fourth quarter of 2013. This survey provides 3D coverage over the outboard portion of the block and has confirmed significant pre-salt prospectivity which had been inferred from older 2D seismic data. The 3D seismic data also covers the Ruche, Tortue and Moubenga discoveries and will facilitate the effective placement of future development wells in the Ruche and Tortue development program, as well as allowing improved assessment of the numerous undrilled structures already identified on older 3D seismic surveys.

 

Based upon the above noted activities and studies, the Company plans to either further develop, farm down, or sell (or a combination of these options) the Dussafu Project, while weighing the liquidity requirements necessary to maintain ongoing Company operations.  See Note 12 – Commitments and Contingencies for a discussion related to our Gabon operations.

 

The Dussafu PSC represents $54.5 million of unproved oil and gas properties including inventory on our September 30, 2015 balance sheet ($54.3 million at December 31, 2014).

 

In December 2014, we impaired the carrying value of our property in Gabon by $50.3 million.  We recorded this impairment based on a qualitative analysis which considered our current liquidity needs, the recent decrease in oil and gas prices, and the marketability of our property and the limited time we have to develop this project. 

 

We reviewed the value of our oilfield inventories that are in the country of Gabon, of which the majority is steel conductor and casing.  We impaired the value of the inventory value by approximately $0.5 million, leaving $3.4 million related to this inventory as of September 30, 2015. 

 

Since approval of the Field Development Plan (FDP) in October 2014, Harvest has continued to move toward development of the Ruche Exclusive Exploitation Area. A tender for all the subsea equipment was concluded in January 2015 where prices exceeded the costs employed in the FDP. Efforts continue to negotiate with the lowest priced vendors and to revise the development scheme to bring the projected cost back to the FDP levels. The depth volume from the 2013 3D seismic acquisition over the discovered fields and the outboard area of the license has been received and interpreted. This new data was incorporated into our reservoir models and optimization of well trajectories to maximize oil recovery is ongoing. In addition, the prospect inventory was updated and several prospects have been high graded for drilling in the first half of 2016. To accommodate the drilling schedule, a site survey, including bathymetry and geophysical data gathering with respect to prospects A/B, 6/7 and 8/9, was completed in August 2015. A tender for a drilling rig for the planned well is in progress.

 

Based on our continuing operations, it is the opinion of the Company that the carrying value is recoverable and no further impairment to this Dussafu project is warranted as of   September 30, 2015.