Contingencies
CONTINGENCIES
Environmental. FCX incurred environmental capital expenditures and other environmental costs (including joint venture partners’ shares) to comply with applicable environmental laws and regulations that affect its operations totaling $612 million in 2012, $387 million in 2011 and $372 million in 2010.

FCX subsidiaries that operate in the U.S. are subject to various federal, state and local environmental laws and regulations that govern emissions of air pollutants; discharges of water pollutants; and generation, handling, storage and disposal of hazardous substances, hazardous wastes and other toxic materials. FCX subsidiaries that operate in the U.S. also are subject to potential liabilities arising under CERCLA or similar state laws that impose responsibility on current and previous owners and operators of a facility for the cleanup of hazardous substances released from the facility into the environment, including damages to natural resources, irrespective of when the damage to the environment occurred or who caused it. This cleanup liability also extends to persons who arranged for the disposal of hazardous substances or transported the hazardous substances to a disposal site selected by the transporter. This liability often is shared on a joint and several basis meaning that each responsible party is fully responsible for the cleanup, although in many cases some or all of the other historical owners or operators no longer exist, do not have the financial ability to respond or cannot be found. As a result, because of FCX’s acquisition of FMC in 2007, many of the subsidiary companies FCX now owns are responsible for a wide variety of environmental remediation projects throughout the U.S. FCX expects to spend substantial sums annually for many years to address those remediation issues. Certain FCX subsidiaries have been advised by the U.S. Environmental Protection Agency (EPA), the Department of the Interior, the Department of Agriculture and several state agencies that, under CERCLA or similar state laws and regulations, they may be liable for costs of responding to environmental conditions at a number of sites that have been or are being investigated to determine whether releases of hazardous substances have occurred and, if so, to develop and implement remedial actions to address environmental concerns. FCX is also subject to claims where the release of hazardous substances is alleged to have damaged natural resources (NRD). As of December 31, 2012, FCX had more than 100 active remediation projects, including NRD claims, in the U.S. in 28 states.

A summary of changes in environmental obligations for the years ended December 31 follows:
 
2012
 
2011
 
2010
Balance at beginning of year
$
1,453

 
$
1,422

 
$
1,464

Accretion expensea
80

 
88

 
97

Additions
70

 
132

 
19

Reductionsb
(182
)
 
(68
)
 

Spending
(199
)
 
(121
)
 
(158
)
Balance at end of year
1,222

 
1,453

 
1,422

Less current portion
(186
)
 
(205
)
 
(138
)
Long-term portion
$
1,036

 
$
1,248

 
$
1,284

a.
Represented accretion of the fair value of environmental obligations assumed in the 2007 acquisition of FMC, which were determined on a discounted cash flow basis.
b.
Reductions primarily reflected adjustments for changes in the anticipated scope and timing of environmental remediation projects and the settlement of environmental matters.

Estimated environmental cash payments (on an undiscounted and unescalated basis) total $186 million in 2013, $225 million in 2014, $124 million in 2015, $107 million in 2016, $110 million in 2017 and $1.7 billion thereafter. The amount and timing of these estimated payments could change as a result of changes in regulatory requirements, changes in scope and timing of remediation activities, the settlement of environmental matters and as actual spending occurs.

FCX was required to record FMC’s environmental obligations at fair value on the acquisition date in accordance with business combination accounting guidance. Significant adjustments to these obligations may occur in the future. New environmental obligations will be recorded as described in Note 1 under “Environmental Expenditures.” At December 31, 2012, FCX’s environmental obligations totaled $1.2 billion, including $1.1 billion recorded on a discounted basis for those obligations assumed in the FMC acquisition at fair value. On an undiscounted and unescalated basis, these obligations totaled $2.4 billion. FCX estimates it is reasonably possible that these obligations could range between $2.1 billion and $2.7 billion on an undiscounted and unescalated basis.

FCX believes that there may be potential claims for recovery from third parties, including the U.S. government and other PRPs. These potential recoveries are not recognized unless realization is considered probable.

At December 31, 2012, the most significant environmental obligations were associated with the Pinal Creek site in Arizona; the Newtown Creek site in New York City; historical smelter sites principally located in Arizona, Kansas, New Jersey, Oklahoma and Pennsylvania; and uranium mining sites in the western U.S. The recorded environmental obligations for these sites totaled $1.0 billion at December 31, 2012. A discussion of these sites follows.

Pinal Creek. The Pinal Creek site was listed under the Arizona Department of Environmental Quality’s (ADEQ) Water Quality Assurance Revolving Fund program in 1989 for contamination in the shallow alluvial aquifers within the Pinal Creek drainage near Miami, Arizona. Since that time, environmental remediation was performed by members of the Pinal Creek Group (PCG), consisting of FMC Miami, Inc. (Miami), a wholly owned subsidiary of FMC, and two other companies. In 1998, the District Court approved a Consent Decree between the PCG members and the state of Arizona resolving all matters related to an enforcement action contemplated by the state of Arizona against the PCG members with respect to groundwater contamination. The Consent Decree committed the PCG members to complete the remediation work outlined in the Consent Decree, and that work continues at this time and is expected to continue for many years in the future. Miami also was a party to litigation entitled Pinal Creek Group, et al. v. Newmont Mining Corporation, et al., United States District Court, District of Arizona, Case No. CIV 91-1764 PHX DAE (LOA), filed on May 1, 1991. Pursuant to a settlement in 2010, Miami paid $40 million to certain members of the PCG to settle the allocation of previously incurred costs, and agreed to take full responsibility for future groundwater remediation at the Pinal Creek site, with limited exceptions. The settlement did not result in a change to the obligation, which was estimated at fair value when assumed in the FMC acquisition. During 2011, the obligation was increased by $31 million to reflect changes in remediation capping designs that incorporate best practices for side slope regrading and cap thickness.

Newtown Creek. From the 1930s until 1964, Phelps Dodge Refining Corporation (PDRC), a subsidiary of FMC, operated a smelter, and from the 1930s until 1984, it operated a refinery on the banks of Newtown Creek (the creek), which is a 3.5-mile-long waterway that forms part of the boundary between Brooklyn and Queens in New York City. Heavy industrialization along the banks of the creek and discharges from the City of New York’s sewer system over more than a century resulted in significant environmental contamination of the waterway. The New York Attorney General previously notified several companies, including PDRC, about possible obligations to clean up contaminated sediments in the creek. In March and April 2010, EPA notified PDRC and five others that EPA considers them to be PRPs under CERCLA. The notified parties began working with EPA to identify other PRPs, and EPA proposed that the notified parties perform a Remedial Investigation/Feasibility Study (RI/FS) at their expense and reimburse EPA for its oversight costs. EPA is not expected to propose a remedy until after a RI/FS is completed, which is expected to take several years. On September 29, 2010, EPA designated the creek as a Superfund site. Effective July 18, 2011, PDRC and five other parties entered an Administrative Order on Consent (AOC) to perform a RI/FS to assess the nature and extent of environmental contamination in the creek and identify potential remedial options. The parties' RI/FS work under the AOC and their identification of other PRPs are ongoing. FCX's financial obligation for this matter was estimated at fair value when it was assumed in the FMC acquisition and is included in FCX's aggregate environmental obligations. The actual costs of fulfilling this remedial obligation and the allocation of costs among PRPs are uncertain and subject to change based on the results of the RI/FS, the remediation remedy ultimately selected by EPA and related allocation determinations. Depending on the overall cost and the portion allocated to PDRC, that share could be material to FCX.

Historical Smelter Sites. FMC and its predecessors at various times owned or operated copper and zinc smelters in several states, including Arizona, Kansas, New Jersey, Oklahoma and Pennsylvania. For some of these smelter sites, certain FCX subsidiaries have been advised by EPA or state agencies that they may be liable for costs of investigating and, if appropriate, remediating environmental conditions associated with the smelters. At other sites, certain FCX subsidiaries have entered into state voluntary remediation programs to investigate and, if appropriate, remediate site conditions associated with the smelters. The historical smelter sites are in various stages of assessment and remediation. The two most significant environmental obligations for historical smelter sites relate to Blackwell, Oklahoma, and Bisbee, Arizona. Adjustments to the environmental obligations for historical smelter sites, which principally were estimated at fair value when assumed in the FMC acquisition, totaled a reduction of $47 million in 2012, primarily because of changes in estimated timing of obligations, and an increase of $36 million in 2011, primarily at the Blackwell, Oklahoma, site (refer to discussion below).

Blackwell. From 1918 to 1974, Blackwell Zinc Company, Inc. (BZC), an indirect subsidiary of FCX, owned and operated a zinc smelter in Blackwell, Oklahoma. In 1974, the smelter was demolished and the property deeded to the Blackwell Industrial Authority. Pursuant to an administrative order with the state of Oklahoma, BZC undertook remedial actions in Blackwell in 1996 and 1997, including sampling the nearby residential and commercial properties, and removing soils on properties that were found to have metal concentrations above state-established cleanup standards. From 1997 to 2003, BZC investigated the nature and extent of groundwater contamination potentially attributable to the former smelter and evaluated options for remedying such contamination. In 2003, the state of Oklahoma adopted a cleanup plan requiring the installation of a groundwater extraction and treatment system and the closure of domestic groundwater wells within the groundwater plume area. BZC completed the construction of a groundwater extraction and treatment system, with system startup and initial discharge of treated water occurring in October 2010.

Between 2007 through 2012, FCX, on behalf of BZC, completed a voluntary soil remediation program by inviting property owners in and around Blackwell to have soil at their properties sampled for the presence of smelter-related contaminants, and offering to remediate properties whose soils were found to have metal concentrations above state-established cleanup standards. As part of this program, FCX sampled soils on approximately 90 percent of the residential properties in Blackwell and remediated soils on about 600 properties. All of these soil sampling and remediation activities were coordinated with, and supervised by, the state of Oklahoma.

On May 23, 2012, the Board of Commissioners of Kay County, Oklahoma, filed suit in Oklahoma District Court against FCX and several affiliates, including BZC, entitled Board of Commissioners of the County of Kay, Oklahoma v. Freeport-McMoRan Copper & Gold Inc., et al., United States District Court, Western District of Oklahoma, Case No. 5:12-cv-00601-C. On May 25, 2012, the case was removed to the United States District Court for the Western District of Oklahoma, and trial is set for October 2013. The suit alleges BZC permitted large quantities of smelter waste to be used as road building and fill material throughout Kay County over a period of decades and seeks unspecified financial assistance for removing and covering much of the material, and unspecified damages for the alleged public nuisance created by the presence of the material. FCX has asserted a counter claim against Kay County for contribution under CERCLA. Separate from the litigation, in fourth-quarter 2012, BZC entered into a Consent Agreement and Final Order with the Oklahoma Department of Environmental Quality and Kay County to conduct an assessment of smelter material present on Kay County's roads, bridges and associated rights-of-way. Sampling is expected to be completed in 2013.

Bisbee. From the 1880s until 1975, FMC and certain predecessor and subsidiary entities operated a copper mine near Bisbee, Arizona. A series of smelters operated in Bisbee from approximately 1879 through 1908. In 2000, FMC entered the Bisbee area into the Arizona Voluntary Remediation Program (VRP) administered by ADEQ. In 2008, FMC expanded the VRP project to include other communities near Bisbee and commenced a voluntary community outreach program inviting property owners to have soils at their properties sampled for the presence of smelter and mine-related metals. For property owners whose soils are found to have metal concentrations above ADEQ-established cleanup standards, FMC has offered to remove the impacted soils and replace them with clean soils. For those property owners who requested sampling, approximately 40 percent require some level of cleanup. At December 31, 2012, approximately 60 percent of the properties whose owners agreed to have their soil cleaned up was completed.

Uranium Mining Sites. During a period between 1940 and the early 1970s, certain FMC predecessor entities were involved in uranium exploration and mining in the western U.S. Similar exploration and mining activities by other companies have caused environmental impacts that have warranted remediation, and EPA and local authorities are currently evaluating the need for significant cleanup activities in the region. To date, FMC has undertaken remediation at a limited number of sites associated with these predecessor entities. An initiative to gather additional information about sites in the region is ongoing, and information gathered under this initiative was submitted to EPA Region 9 during the second and third quarters of 2008 and the fourth quarter of 2009 in response to an information request by EPA regarding uranium mining activities on Navajo Nation properties. FCX utilized the results of FMC’s remediation experience, in combination with historical and updated information to initially estimate the fair value of uranium-related liabilities assumed in the FMC acquisition.

Asset Retirement Obligations (AROs). FCX’s ARO cost estimates are reflected on a third-party cost basis and comply with FCX’s legal obligation to retire tangible, long-lived assets.

A summary of changes in FCX’s AROs for the years ended December 31 follows:
 
2012
 
2011
 
2010
Balance at beginning of year
$
921

 
$
856

 
$
731

Liabilities incurred
6

 
9

 
5

Revisions to cash flow estimatesa
211

 
48

 
105

Accretion expense
55

 
58

 
54

Spending
(47
)
 
(49
)
 
(38
)
Foreign currency translation adjustment

 
(1
)
 
(1
)
Balance at end of year
1,146

 
921

 
856

Less current portion
(55
)
 
(31
)
 
(69
)
Long-term portion
$
1,091

 
$
890

 
$
787


a.
Revisions to cash flow estimates were primarily related to updated closure plans that included revised cost estimates and accelerated timing of certain closure activities.

ARO costs may increase or decrease significantly in the future as a result of changes in regulations, changes in engineering designs and technology, permit modifications or updates, changes in mine plans, inflation or other factors and as actual reclamation spending occurs. ARO activities and expenditures generally are made over an extended period of time commencing near the end of the mine life; however, certain reclamation activities may be accelerated if legally required or if determined to be economically beneficial.

Legal requirements in New Mexico, Arizona, Colorado and other states require financial assurance to be provided for the estimated costs of reclamation and closure, including groundwater quality protection programs. FCX has satisfied financial assurance requirements by using a variety of mechanisms, such as performance guarantees, financial capability demonstrations, trust funds, surety bonds, letters of credit and collateral. The applicable regulations specify financial strength tests that are designed to confirm a company’s or guarantor’s financial capability to fund estimated reclamation and closure costs. The amount of financial assurance FCX is required to provide will vary with changes in laws, regulations and reclamation and closure requirements, and cost estimates. At December 31, 2012, FCX’s financial assurance obligations associated with these closure and reclamation costs totaled $970 million, of which $601 million was in the form of guarantees issued by FCX and financial capability demonstrations. At December 31, 2012, FCX had trust assets totaling $161 million (included in other assets), which are legally restricted to fund a portion of its AROs for properties in New Mexico as required by New Mexico regulatory authorities.

New Mexico Environmental and Reclamation Programs. FCX’s New Mexico operations are regulated under the New Mexico Water Quality Act and regulations adopted under that act by the Water Quality Control Commission (WQCC). The New Mexico Environment Department (NMED) has required each of these operations to submit closure plans for NMED’s approval. The closure plans must include measures to assure meeting groundwater quality standards following the closure of discharging facilities and to abate any groundwater or surface water contamination. In March 2009, the Tyrone operation appealed the WQCC Final Order, dated February 4, 2009, regarding location of the “places of withdrawal of water,” a legal criterion used to determine where groundwater quality standards must be met at FCX’s New Mexico mining sites. In December 2010, FCX's Tyrone mine entered into a settlement agreement with NMED that calls for a stay of the appeal while NMED and the WQCC complete several administrative actions, including renewal of Tyrone’s closure permit consistent with the terms of the settlement, review and approval of a groundwater abatement plan and adoption of alternative abatement standards, and adoption of new groundwater discharge permit rules for copper mines. If the administrative actions are concluded consistent with the terms of the settlement agreement within the period of the stay, then Tyrone will move to dismiss the appeal. In December 2012, Tyrone and NMED agreed to extend the period to conclude the administrative actions through December 31, 2013. The Court of Appeals also extended the stay for another year. Finalized closure plan requirements, including those resulting from the actions to be taken under the settlement agreement, could result in increases in closure costs for FCX's New Mexico operations.

FCX’s New Mexico operations also are subject to regulation under the 1993 New Mexico Mining Act (the Mining Act) and the related rules that are administered by the Mining and Minerals Division (MMD) of the New Mexico Energy, Minerals and Natural Resources Department. Under the Mining Act, mines are required to obtain approval of plans describing the reclamation to be performed following cessation of mining operations. At December 31, 2012, FCX had accrued reclamation and closure costs of $476 million for its New Mexico operations. As stated above, additional accruals may be required based on the state’s review of FCX’s updated closure plans and any resulting permit conditions, and the amount of those accruals could be material.

Arizona Environmental and Reclamation Programs. FCX’s Arizona properties are subject to regulatory oversight in several areas. ADEQ has adopted regulations for its aquifer protection permit (APP) program that require permits for, among other things, certain facilities, activities and structures used for mining, concentrating and smelting and require compliance with aquifer water quality standards at an applicable point of compliance well or location. The APP program also may require mitigation and discharge reduction or elimination of some discharges.

An application for an APP requires a description of a closure strategy that will meet applicable groundwater protection requirements following cessation of operations and an estimate of the cost to implement the closure strategy. An APP may specify closure requirements, which may include post-closure monitoring and maintenance. A more detailed closure plan must be submitted within 90 days after a permitted entity notifies ADEQ of its intent to cease operations. A permit applicant must demonstrate its financial ability to meet the closure costs estimated in the APP.

Portions of Arizona mining facilities that operated after January 1, 1986, also are subject to the Arizona Mined Land Reclamation Act (AMLRA). AMLRA requires reclamation to achieve stability and safety consistent with post-mining land use objectives specified in a reclamation plan. Reclamation plans must be approved by the State Mine Inspector and must include an estimate of the cost to perform the reclamation measures specified in the plan.
FCX will continue to evaluate options for future reclamation and closure activities at its operating and non-operating sites, which are likely to result in adjustments to FCX’s ARO liabilities. At December 31, 2012, FCX had accrued reclamation and closure costs of $240 million for its Arizona operations.

Colorado Reclamation Programs. FCX's Colorado operations are regulated by the Colorado Mined Land Reclamation Act (Reclamation Act) and regulations promulgated thereunder. Under the Reclamation Act, mines are required to obtain approval of reclamation plans describing the reclamation of lands affected by mining operations to be performed during mining or upon cessation of mining operations.  As of December 31, 2012, FCX had accrued reclamation and closure costs of $47 million for its Colorado operations.

Chilean Reclamation and Closure Programs. In July 2011, the Chilean senate passed legislation regulating mine closure, which establishes new requirements for closure plans and became effective in November 2012. FCX's Chilean operations will be required to update closure plans and provide financial assurance for these obligations. FCX cannot predict at this time the cost of these closure plans or the levels or forms of financial assurance that may be required. Revised closure plans for the Chilean mine sites are due in November 2014. At December 31, 2012, FCX had accrued reclamation and closure costs of $54 million for its Chilean operations.

Peruvian Reclamation and Closure Programs. Cerro Verde is subject to regulation under the Mine Closure Law administered by the Peruvian Ministry of Energy and Mines. Under the closure regulations, mines must submit a closure plan that includes the reclamation methods, closure cost estimates, methods of control and verification, closure and post-closure plans and financial assurance. The updated closure plan for the Cerro Verde mine expansion must be submitted to the Peruvian regulatory authorities in December 2013. At December 31, 2012, Cerro Verde had accrued reclamation and closure costs of $89 million and had financial assurance obligations associated with these reclamation and closure costs totaling $9 million in the form of letters of credit.

Indonesian Reclamation and Closure Programs. The ultimate amount of reclamation and closure costs to be incurred at PT Freeport Indonesia’s operations will be determined based on applicable laws and regulations and PT Freeport Indonesia’s assessment of appropriate remedial activities in the circumstances, after consultation with governmental authorities, affected local residents and other affected parties and cannot currently be projected with precision. Estimates of the ultimate reclamation and closure costs PT Freeport Indonesia will incur in the future involve complex issues requiring integrated assessments over a period of many years and are subject to revision over time as more complete studies are performed. Some reclamation costs will be incurred during mining activities, while most closure costs and the remaining reclamation costs will be incurred at the end of mining activities, which are currently estimated to continue for nearly 30 years. At December 31, 2012, PT Freeport Indonesia had accrued reclamation and closure costs of $195 million and a long-term receivable for Rio Tinto’s share of the obligation of $18 million (included in long-term receivables).

In 1996, PT Freeport Indonesia began contributing to a cash fund ($16 million balance at December 31, 2012) designed to accumulate at least $100 million (including interest) by the end of its Indonesia mining activities. PT Freeport Indonesia plans to use this fund, including accrued interest, to pay mine closure and reclamation costs. Any costs in excess of the $100 million fund would be funded by operational cash flow or other sources.

In December 2009, PT Freeport Indonesia submitted its revised mine closure plan to the Department of Energy and Mineral Resources for review and has addressed comments received during the course of this review process. In December 2010, the President of Indonesia issued a regulation regarding mine reclamation and closure, which requires a company to provide a mine closure guarantee in the form of a time deposit placed in a state-owned bank in Indonesia. In accordance with its Contract of Work, PT Freeport Indonesia is working with the Department of Energy and Mineral Resources to review these requirements, including discussion of other options for the mine closure guarantee.

Litigation. FCX is involved in numerous legal proceedings that arise in the ordinary course of business or are associated with environmental issues arising from legacy operations conducted over the years by FMC and its affiliates as discussed in this note under “Environmental.” FCX is also involved periodically in other reviews, investigations and proceedings by government agencies, some of which may result in adverse judgments, settlements, fines, penalties, injunctions or other relief. Management does not believe, based on currently available information, that the outcome of any legal proceeding reported below will have a material adverse effect on FCX's financial condition, although individual outcomes could be material to FCX's operating results for a particular period, depending on the nature and magnitude of the outcome and the operating results for the period. Refer to Note 1 for further discussion of FCX's accounting policy for litigation contingencies.

Asbestos Claims. Since approximately 1990, FMC and various subsidiaries have been named as defendants in a large number of lawsuits that claim personal injury either from exposure to asbestos allegedly contained in electrical wire products produced or marketed many years ago or from asbestos contained in buildings and facilities located at properties owned or operated by FMC affiliates, or from alleged asbestos in talc products. Many of these suits involve a large number of codefendants. Based on litigation results to date and facts currently known, FCX believes there is a reasonable possibility that losses may have been incurred related to these matters; however, FCX also believes that the amounts of any such losses, individually or in the aggregate, are not material to its consolidated financial statements. There can be no assurance, however, that future developments will not alter this conclusion.

Yonkers Site. From 1932 until 1984, an affiliate of FMC owned and operated a cable manufacturing facility on the Hudson River in Yonkers, New York. FMC sold that operation in 1984, and it was subsequently sold to BICC Cables Corporation (BICC). BICC closed the facility in 1996. In 2005, Blackacre Partners OPS, LLC (Blackacre) began environmental cleanup work at the site using funding provided by FMC and BICC. One Point Street, Inc. (OPS), a real estate developer, has current title to the site.

On September 9, 2011, OPS filed a complaint in the United States District Court for the Southern District of New York, which it amended on March 1, 2012. The amended complaint alleged that FMC, BICC and Blackacre failed to timely and diligently complete remediation of the site in breach of alleged obligations under CERCLA and New York Environmental Conservation Law, and under the contractual agreements among the parties. In fourth-quarter 2012, this matter was settled, and OPS will be completing the limited remaining cleanup work at the site using funds provided by FMC and BICC.
Columbian Chemicals Company (Columbian) Claims. Columbian, formerly a subsidiary of FMC, has notified FCX of various indemnification claims arising out of the 2005 agreement pursuant to which Columbian was sold. The principal outstanding claims relate to (1) multiple mass tort suits pending against Columbian in West Virginia state court for alleged personal injury and property damage resulting from exposure to carbon black (the Carbon Black claims) and (2) an investigation being conducted by EPA of potential Clean Air Act violations during the period Columbian was owned by FMC (the Clean Air Act matter). In April 2012, Columbian filed suit in New York state court (Columbian Chemicals Company and Columbian Chemicals Acquisition LLC v. Freeport-McMoRan Corporation f/k/a Phelps Dodge Corporation, County of New York, Supreme Court of the State of New York, Index No. 600999/2010), that alleged, among other things, that the Carbon Black claims are the responsibility of FMC, and are not subject to the aggregate cap under the 2005 agreement pursuant to which Columbian was sold. In July 2012, FCX and Columbian reached a settlement pursuant to which the litigation was dismissed with prejudice and all outstanding disputes regarding the extent of FCX's indemnity obligations to Columbian were fully resolved. Under the terms of the settlement, FCX's remaining possible exposure is to indemnify Columbian for incurred losses related only to the Carbon Black claims and the Clean Air Act matter. The cap, net of amounts reserved and paid, totaled $122 million at December 31, 2012. FMC cannot estimate Columbian's exposure, if any, for the Carbon Black claims or the Clean Air Act matter.

Shareholder Litigation. Thirteen derivative actions challenging the PXP merger and/or the MMR merger were filed on behalf of FCX by purported FCX stockholders. Ten were filed in the Court of Chancery of the State of Delaware and three were filed in the Superior Court of the State of Arizona, County of Maricopa. On January 25, 2013, the Delaware Court of Chancery consolidated the Delaware actions into a single action, In Re Freeport-McMoRan Copper & Gold Inc. Derivative Litigation, No. 8145-VCN, and discovery is proceeding in that action. On January 17, 2013, the Arizona Superior Court consolidated two of the Arizona actions into In Re Freeport-McMoRan Derivative Litigation, No. CV2012-018351. A third Arizona complaint, Harris v. Adkerson et al., No. CV2013-004163, was consolidated with the first two Arizona actions on February 8, 2013. The actions name some or all of the following as defendants: the directors and certain officers of FCX, two FCX subsidiaries, PXP and certain of its directors, and MMR and certain of its directors and officers. The actions allege, among other things, that the FCX directors breached their fiduciary duties to FCX stockholders because they, among other things, pursued their own interests at the expense of stockholders in approving the PXP and MMR mergers. The complaints also allege that some or all of the following parties aided and abetted the wrongful acts allegedly committed by the directors and certain officers of FCX: two FCX subsidiaries, PXP and certain of its directors, and MMR and certain of its directors and officers. The actions seek as relief, among other things, an injunction barring or rescinding both the PXP merger and the MMR merger and requiring submission of the proposed PXP merger and MMR merger to a vote of FCX stockholders, damages, and attorneys' fees and costs.

Three putative class actions challenging the PXP merger were filed on behalf of PXP stockholders in the Court of Chancery of the State of Delaware. On January 15, 2013, the Court of Chancery consolidated the actions into a single action, In Re Plains Exploration & Production Company Stockholder Litigation, No. 8090-VCN, and discovery is proceeding in that action. The action names as defendants PXP, the directors of PXP, FCX, and an FCX subsidiary. The action alleges that PXP's directors breached their fiduciary duties because they, among other things, pursued their own interests at the expense of stockholders and failed to maximize stockholder value with respect to the merger, and that FCX and an FCX subsidiary aided and abetted the breach of fiduciary duties by PXP's directors. The action seeks as relief an injunction barring or rescinding the PXP merger, damages, and attorneys' fees and costs.

In addition, ten putative class actions challenging the MMR merger were filed on behalf of MMR stockholders. Nine were filed in the Court of Chancery of the State of Delaware. On January 25, 2012, the Court of Chancery consolidated the actions into a single action, In Re McMoRan Exploration Co. Stockholder Litigation, No. 8132-VCN, and discovery is proceeding in that action. One action was also filed in the Civil District Court for the Parish of Orleans of the State of Louisiana: Langley v. Moffett et al., No. 2012-11904, filed December 19, 2012. Each of the actions names some or all of the following as defendants, in addition to MMR and its directors: FCX, two FCX subsidiaries, the Gulf Coast Ultra Deep Royalty Trust and PXP. The actions allege that MMR's directors breached their fiduciary duties because they, among other things, pursued their own interests at the expense of stockholders and failed to maximize stockholder value with respect to the merger, and that PXP, FCX, or both, aided and abetted the breach of fiduciary duty by MMR's directors. The Delaware action also asserts claims derivatively on behalf of MMR. The actions seek, among other things, injunctive relief barring or rescinding the MMR merger, damages, and attorneys' fees and costs.

FCX intends to vigorously defend itself in these matters.

Tax Matters. Cerro Verde Tax Proceedings. SUNAT, the Peruvian national tax authority, has assessed mining royalties on materials processed by the Cerro Verde concentrator that commenced operations in late 2006. These assessments cover the period October 2006 to December 2007 and the years 2008 and 2009. SUNAT has issued rulings denying Cerro Verde’s protest of the assessments. Cerro Verde has appealed these decisions and currently has three cases pending before the Peruvian Tax Court. Cerro Verde is challenging these royalties because it believes its stability agreement provides an exemption for all minerals extracted from its mining concession, irrespective of the method used for processing those minerals. Although FCX believes its interpretation of the stability agreement is correct, if Cerro Verde is ultimately found responsible for these assessments, it will also be liable for interest, which accrues at rates that range from approximately 7 to 18 percent based on the year accrued and the currency in which the amounts would be payable. At December 31, 2012, the aggregate amount of the assessments, including interest and penalties, totaled $218 million. SUNAT may continue to assess mining royalties annually until this matter is resolved by the Peruvian Tax Tribunal.

Cerro Verde is also challenging various income and value-added tax assessments from SUNAT covering the years 2002 through 2008 and has cases pending before the Peruvian Tax Court. At December 31, 2012, the approximate amount of these assessments, including interest and penalties, totaled $180 million.

Indonesia Tax Matters. The Indonesian tax authorities issued assessments for various audit exceptions on PT Freeport Indonesia's tax returns as follows (in millions):
Date of Assessment
 
Tax Return Year
 
Tax Assessment
 
Interest Assessment
 
Total
October 2010
 
2005
 
$
106

 
$
52

 
$
158

November 2011
 
2006
 
22

 
10

 
32

March 2012
 
2007
 
91

 
44

 
135

Total
 
 
 
$
219

 
$
106

 
$
325

 
PT Freeport Indonesia has filed objections to the assessments because it believes it has properly paid its taxes. During first-quarter 2012, PT Freeport Indonesia's objections to the assessments related to 2005 were substantially all rejected by the Indonesian tax authorities and, in May 2012, appeals were filed with the Indonesian Tax Court. As of December 31, 2012, PT Freeport Indonesia has paid $182 million (of which $148 million is included in long-term receivables) for the disputed tax assessments related to 2005, 2006 and 2007. PT Freeport Indonesia is working with the Indonesian tax authorities to resolve these matters and expects to receive additional assessments from the Indonesian tax authorities for their audit of its 2008 tax return.

In December 2009, PT Freeport Indonesia was notified by the Large Taxpayer's Office of the Government of Indonesia of its view that PT Freeport Indonesia is obligated to pay value added taxes on certain goods imported after the year 2000. The amount of such taxes and related penalties under this view would be significant. PT Freeport Indonesia believes that, pursuant to the terms of its Contract of Work, it is only required to pay value added taxes on these types of goods imported after December 30, 2009. PT Freeport Indonesia has not received a formal assessment and is working with the applicable government authorities to resolve this matter.

Letters of Credit, Bank Guarantees and Surety Bonds.  Letters of credit and bank guarantees totaled $98 million at December 31, 2012, primarily for reclamation and environmental obligations, workers’ compensation insurance programs, tax and customs obligations, and other commercial obligations. In addition, FCX had surety bonds totaling $159 million at December 31, 2012, associated with reclamation and closure ($137 million), self-insurance bonds primarily for workers’ compensation ($18 million) and other bonds ($4 million).

Insurance.  FCX purchases a variety of insurance products to mitigate potential losses. The various insurance products typically have specified deductible amounts or self-insured retentions and policy limits. FCX generally is self-insured for U.S. workers’ compensation, but purchases excess insurance up to statutory limits. An actuarial analysis is performed twice a year for various FCX casualty programs, including workers’ compensation, to estimate required insurance reserves. Insurance reserves totaled $52 million at December 31, 2012, which consisted of a current portion of $8 million (included in accounts payable and accrued liabilities) and a long-term portion of $44 million (included in other liabilities).

FCX maintains property damage and business interruption insurance related to its operations. FCX and its insurers entered into an insurance settlement agreement in December 2012. The insurers agreed to pay an aggregate of $63 million, including PT Freeport Indonesia's joint venture partner's share, for the settlement of the insurance claim for business interruption and property damage relating to the 2011 incidents affecting PT Freeport Indonesia's concentrate pipelines. As a result of the settlement, FCX recorded a gain of $59 million ($31 million to net income attributable to FCX common stockholders) in 2012.