XML 56 R34.htm IDEA: XBRL DOCUMENT v3.25.4
Commitments and Contingencies
12 Months Ended
Dec. 31, 2025
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies Commitments and Contingencies
In the early 1990s, the Company identified certain soil and groundwater contamination at AC Products, Inc. (“ACP”), a wholly owned subsidiary. In voluntary coordination with the Santa Ana California Regional Water Quality Board, ACP has been remediating the contamination, the principal contaminant of which is perchloroethylene (“PERC”). In 2004, the Orange County Water District (“OCWD”) filed a civil complaint against ACP and other parties seeking to recover compensatory and other damages related to the investigation and remediation of the contamination in the groundwater. Pursuant to a settlement agreement with OCWD, ACP agreed, among other things, to operate the two groundwater treatment systems to hydraulically contain groundwater contamination emanating from ACP’s site until the concentrations of PERC released by ACP fell below the current Federal maximum contaminant level for four consecutive quarterly sampling events. In 2014, ACP ceased operation at one of its two groundwater treatment systems, as it had met the above condition for closure. In 2020, the Santa Ana Regional Water Quality Control Board asked that ACP conduct periodic indoor and outdoor soil vapor testing on and near the ACP site to confirm that ACP continues to meet the applicable local standards. ACP has performed such testing program work with an additional round of testing done in 2025. It is expected that additional testing may occur in 2026. As of December 31, 2025, ACP believes it has met the conditions for closure of the remaining groundwater treatment system but continues to operate this system while in discussions with the relevant authorities.
The Company’s Sao Paulo, Brazil site was required under Brazilian environmental, health and safety regulations to perform an environmental assessment as part of a permit renewal process. Initial investigations identified soil and ground water contamination in select areas of the site. The site has conducted a multi-year soil and groundwater investigation and corresponding risk assessments based on the result of the investigations. In 2017, the site had to submit a new 5-year permit renewal request and was asked to complete additional investigations to further delineate the site based on review of the technical data by the local regulatory agency, Companhia Ambiental do Estado de São Paulo (“CETESB”). Based on review of the updated investigation data, CETESB issued a Technical Opinion regarding the investigation and remedial actions taken to date. The site developed an action plan and submitted it to CETESB in 2018 based on CETESB requirements. The site intervention plan primarily requires the site, amongst other actions, to conduct periodic monitoring for methane in soil vapors, source zone delineation, groundwater plume delineation, bedrock aquifer assessment, update the human health risk assessment, develop a current site conceptual model and conduct a remedial feasibility study and provide a revised intervention plan. In 2020, the site submitted a report on the activities completed including the revised site conceptual model and results of the remedial feasibility study and recommended remedial strategy for the site. The site believes it will achieve the remedial objectives in June 2027, at which time a request for closure of the treatment system will be submitted.
The Company is also party to other environmental matters related to certain domestic and foreign properties. These environmental matters primarily require the Company to perform ongoing monitoring and maintenance at each of the applicable sites. During the year ended December 31, 2025, there have been no significant changes to the facts or circumstances of these matters. The Company had accrued obligations of $3.4 million and $3.6 million as of December 31, 2025 and 2024, respectively, for these environmental matters. These obligations are included in other accrued liabilities and other non-current liabilities on the Company’s Consolidated Balance Sheets. These accrued amounts are inclusive of the Brazilian environmental matter discussed below.
Other environmental matters include participation in certain payments in connection with four currently active environmental consent orders related to certain hazardous waste cleanup activities under the U.S. Federal Superfund statute. The Company has been designated a potentially responsible party (“PRP”) by the Environmental Protection Agency along with other PRPs depending on the site, and has other obligations to perform cleanup activities at certain other foreign subsidiaries. These environmental matters primarily require the Company to perform long-term monitoring as well as operating and maintenance at each of the applicable sites. The Company believes that it has made adequate accruals for costs associated with other environmental matters of which it is aware. Approximately $0.5 million and $0.6 million were accrued as of December 31, 2025 and 2024, respectively, to provide for such anticipated future environmental assessments and remediation costs.
The Company previously disclosed in its 2024 Form 10-K that one of its North American production facilities experienced an electrical fire in 2021 that resulted in property damage and the temporary shutdown of production. The Company and its insurance carrier reviewed the impact of the electrical fire on the production facility’s operations as it relates to a potential business interruption insurance claim. In July 2024, the Company and its insurance carrier settled this claim for $1.0 million.
The Company is party to other litigation which management currently believes will not have a material adverse effect on the Company’s results of operations, cash flows or financial condition. In addition, the Company has an immaterial amount of contractual purchase obligations.