XML 67 R54.htm IDEA: XBRL DOCUMENT v3.25.0.1
Jointly-owned Plant (Tables)
12 Months Ended
Dec. 31, 2024
Jointly-owned Plant [Abstract]  
Schedule of Jointly Owned Utility Plants [Table Text Block]
As of December 31, 2024, PGE had the following investments in jointly-owned plant (dollars in millions):
 PGE
Share
In-service DatePlant
In-service
Accumulated
Depreciation (1)
Construction
Work In
Progress
Colstrip - Generation
20.00 %1986$507 $449 $
Colstrip-Transmission
Various (2)
1986
69 40 — 
Pelton/Round Butte
50.01 %1958/1964221 76 20 
Total$797 $565 $25 
(1) Excludes AROs and accumulated asset retirement removal costs.
(2) 14% of the 2,260 MW transmission facilities between the Colstrip switchyard to the Broadview switchyard, near Billings, Montana, and 16% of the 1,930 MW transmission facilities between the Broadview switchyard and the interconnection point with Bonneville Power Administration’s transmission system near Townsend, Montana.