Environmental Exit Cost [Line Items]    
Environmental clean up, agreement terms The preliminary agreement, which is outlined below, includes Removal of about 2,000 creosote pilings; Excavation of intertidal areas and dredging of wood waste from the bottom of Port Gamble Bay; Installation of a sand-cap of up to four feet in specific locations in Port Gamble Bay; Removal of all existing docks and overwater structures on and around the former Pope & Talbot Port Gamble mill site.  
Total estimated clean up cost $ 17,000,000  
Accrual for estimated environmental remediation costs 13,700,000 13,900,000
Environmental liability, next 12 month 497,000  
Environmental liability thereafter 13,200,000  
Minimum
   
Environmental Exit Cost [Line Items]    
Estimated environmental clean up costs 11,500,000  
Maximum
   
Environmental Exit Cost [Line Items]    
Estimated environmental clean up costs $ 16,100,000