Commitments and Contingencies
3 Months Ended
Mar. 31, 2022
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies Commitments and Contingencies
 
Palo Verde Generating Station
 
Spent Nuclear Fuel and Waste Disposal
 
On December 19, 2012, APS, acting on behalf of itself and the participant owners of Palo Verde, filed a second breach of contract lawsuit against the United States Department of Energy (“DOE”) in the United States Court of Federal Claims (“Court of Federal Claims”).  The lawsuit sought to recover damages incurred due to DOE’s breach of the Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (“Standard Contract”) for failing to accept Palo Verde’s spent nuclear fuel and high level waste from January 1, 2007, through June 30, 2011, as it was required to do pursuant to the terms of the Standard Contract and the Nuclear Waste Policy Act.  On August 18, 2014, APS and DOE entered into a settlement agreement, stipulating to a dismissal of the lawsuit and payment by DOE to the Palo Verde owners for certain specified costs incurred by Palo Verde during the period January 1, 2007 through June 30, 2011. In addition, the settlement agreement, as amended, provides APS with a method for submitting claims and getting recovery for costs incurred through December 31, 2022.

APS has submitted seven claims pursuant to the terms of the August 18, 2014 settlement agreement, for seven separate time periods during July 1, 2011 through June 30, 2020. The DOE has approved and paid $111.8 million for these claims (APS’s share is $32.5 million). The amounts recovered were primarily recorded as adjustments to a regulatory liability and had no impact on reported net income. In accordance with the 2017 Rate Case Decision, this regulatory liability is being refunded to customers. See Note 4. On November 1, 2021, APS filed its eighth claim pursuant to the terms of the August 18, 2014 settlement agreement in the amount of $12.2 million (APS’s share is $3.6 million). On March 22, 2022, the DOE approved a payment of $12.1 million (APS’s share is $3.5 million) and on April 19, 2022, APS received this payment.

Nuclear Insurance

Public liability for incidents at nuclear power plants is governed by the Price-Anderson Nuclear Industries Indemnity Act (“Price-Anderson Act”), which limits the liability of nuclear reactor owners to the amount of insurance available from both commercial sources and an industry-wide retrospective payment plan.  In accordance with the Price-Anderson Act, the Palo Verde participants are insured against public liability for a nuclear incident of up to approximately $13.5 billion per occurrence. Palo Verde maintains the maximum available nuclear liability insurance in the amount of $450 million, which is provided by American Nuclear Insurers (“ANI”).  The remaining balance of approximately $13.1 billion of liability coverage is provided through a mandatory industry-wide retrospective premium program.  If losses at any nuclear power plant covered by the program exceed the accumulated funds, APS could be responsible for retrospective premiums.  The maximum retrospective premium per reactor under the program for each nuclear liability incident is approximately $137.6 million, subject to a maximum annual premium of approximately $20.5 million per incident.  Based on APS’s ownership interest in the three Palo Verde units, APS’s maximum retrospective premium per incident for all three units is approximately $120.1 million, with a maximum annual retrospective premium of approximately $17.9 million.

The Palo Verde participants maintain insurance for property damage to, and decontamination of, property at Palo Verde in the aggregate amount of $2.8 billion.  APS has also secured accidental outage insurance for a sudden and unforeseen accidental outage of any of the three units.  The property damage, decontamination, and accidental outage insurance are provided by Nuclear Electric Insurance Limited (“NEIL”).  APS is subject to retrospective premium adjustments under all NEIL policies if NEIL’s losses in
any policy year exceed accumulated funds. The maximum amount APS could incur under the current NEIL policies totals approximately $22.3 million for each retrospective premium assessment declared by NEIL’s Board of Directors due to losses.  In addition, NEIL policies contain rating triggers that would result in APS providing approximately $62.8 million of collateral assurance within 20 business days of a rating downgrade to non-investment grade.  The insurance coverage discussed in this and the previous paragraph is subject to certain policy conditions, sublimits and exclusions.

Contractual Obligations

As of March 31, 2022, our fuel and purchased power and purchase obligation commitments have increased from the information provided in our 2021 Form 10-K. The increase is primarily due to new purchased power and energy storage commitments of approximately $1.2 billion. The majority of the changes relate to 2024 and thereafter. This amount includes approximately $500 million of commitments relating to a new purchased power lease contract that is included in our non-commenced lease discussion below.

At March 31, 2022, we have various lease arrangements that have been executed but have not yet commenced. These arrangements primarily relate to energy storage assets, with expected lease commencement dates ranging from June 2022 through June 2024, with terms expiring through May 2044. We expect the total fixed consideration paid for these arrangements, which includes both lease and nonlease payments, will approximate $1.8 billion over the term of the arrangements. For additional information regarding our lease commitments see our 2021 Form 10-K.

Other than the items described above, there have been no material changes, as of March 31, 2022, outside the normal course of business in contractual obligations from the information provided in our 2021 Form 10-K. See Note 3 for discussion regarding changes in our short-term and long-term debt obligations.

Superfund and Other Related Matters
 
The Comprehensive Environmental Response Compensation and Liability Act (“Superfund” or “CERCLA”) establishes liability for the cleanup of hazardous substances found contaminating the soil, water or air.  Those who released, generated, transported to or disposed of hazardous substances at a contaminated site are among the parties who are potentially responsible (each a “PRP”).  PRPs may be strictly, jointly, and severally liable for clean-up.  On September 3, 2003, EPA advised APS that EPA considers APS to be a PRP in the Motorola 52nd Street Superfund Site, Operable Unit 3 (“OU3”) in Phoenix, Arizona.  APS has facilities that are within this Superfund site.  APS and Pinnacle West have agreed with EPA to perform certain investigative activities of the APS facilities within OU3.  In addition, on September 23, 2009, APS agreed with EPA and one other PRP to voluntarily assist with the funding and management of the site-wide groundwater remedial investigation and feasibility study (“RI/FS”).  Based upon discussions between the OU3 working group parties and EPA, along with the results of recent technical analyses prepared by the OU3 working group to supplement the RI/FS for OU3, APS anticipates finalizing the RI/FS later in 2022. APS's estimated costs related to this investigation and study are approximately $3 million.  APS anticipates incurring additional expenditures in the future, but because the overall investigation is not complete and ultimate remediation requirements are not yet finalized, at the present time expenditures related to this matter cannot be reasonably estimated.
 
On August 6, 2013, the Roosevelt Irrigation District (“RID”) filed a lawsuit in Arizona District Court against APS and 24 other defendants, alleging that RID’s groundwater wells were contaminated by the release of hazardous substances from facilities owned or operated by the defendants.  The lawsuit also alleges that, under Superfund laws, the defendants are jointly and severally liable to RID.  The allegations against APS arise out of APS’s current and former ownership of facilities in and around OU3.  As part of a state governmental
investigation into groundwater contamination in this area, on January 25, 2015, the Arizona Department of Environmental Quality (“ADEQ”) sent a letter to APS seeking information concerning the degree to which, if any, APS’s current and former ownership of these facilities may have contributed to groundwater contamination in this area.  APS responded to ADEQ on May 4, 2015. On December 16, 2016, two RID environmental and engineering contractors filed an ancillary lawsuit for recovery of costs against APS and the other defendants in the RID litigation. That same day, another RID service provider filed an additional ancillary CERCLA lawsuit against certain of the defendants in the main RID litigation but excluded APS and certain other parties as named defendants. Because the ancillary lawsuits concern past costs allegedly incurred by these RID vendors, which were ruled unrecoverable directly by RID in November of 2016, the additional lawsuits do not increase APS’s exposure or risk related to these matters.

On April 5, 2018, RID and the defendants in that particular litigation executed a settlement agreement, fully resolving RID’s CERCLA claims concerning both past and future cost recovery. APS’s share of this settlement was immaterial. In addition, the two environmental and engineering vendors voluntarily dismissed their lawsuit against APS and the other named defendants without prejudice. An order to this effect was entered on April 17, 2018. With this disposition of the case, the vendors may file their lawsuit again in the future. On August 16, 2019, Maricopa County, one of the three direct defendants in the service provider lawsuit, filed a third-party complaint seeking contribution for its liability, if any, from APS and 28 other third-party defendants. We are unable to predict the outcome of these matters; however, we do not expect the outcome to have a material impact on our financial position, results of operations or cash flows.

On February 28, 2022, EPA provided APS with a request for information under CERCLA related to APS’s Ocotillo power plant site located in Tempe, Arizona. In particular, EPA seeks information from APS regarding the APS’s use, storage, and disposal of substances containing per-and polyfluoroalkyl (“PFAS”) compounds at the Ocotillo power plant site in order to aid EPA’s investigation into actual or threatened releases of PFAS into groundwater within the South Indian Bend Wash (“SIBW”) Superfund site. The SIBW Superfund site includes the APS Ocotillo power plant site. On April 29, 2022, APS filed its response to this information request. At the present time, we are unable to predict the outcome of this matter and expenditures related to this matter cannot be reasonably estimated.

Arizona Attorney General Matter

APS received civil investigative demands from the Attorney General seeking information pertaining to the rate plan comparison tool offered to APS customers and other related issues including implementation of rates from the 2017 Settlement Agreement and its Customer Education and Outreach Plan associated with the 2017 Settlement Agreement. APS fully cooperated with the Attorney General’s Office in this matter. On February 22, 2021, APS entered into a consent agreement with the Attorney General as a way to settle the matter. The settlement resulted in APS paying $24.75 million, approximately $24 million of which was returned to customers as restitution.

Four Corners SCR Cost Recovery

As part of APS’s 2019 Rate Case, APS included recovery of the deferral and rate base effects of the Four Corners SCR project. On November 2, 2021, the 2019 Rate Case decision was approved by the ACC allowing approximately $194 million of SCR related plant investments and cost deferrals in rate base and to recover, depreciate and amortize in rates based on an end-of-life assumption of July 2031. The decision also included a partial and combined disallowance of $215.5 million on the SCR investments and deferrals. APS believes the SCR plant investments and related SCR cost deferrals were prudently incurred, and on December 17, 2021, APS filed its Notice of Direct Appeal at the Arizona Court of Appeals requesting review of the $215.5 million disallowance and the appeal is proceeding in the normal course. Based on the partial
recovery of these investments and cost deferrals in current rates and the uncertainty of the outcome of the legal appeals process, APS has not recorded an impairment or write-off relating to the SCR plant investments or deferrals as of March 31, 2022. If the 2019 Rate Case decision to disallow $215.5 million of the SCRs is ultimately upheld, APS will be required to record a charge to its results of operations, net of tax, of approximately $154.4 million. We cannot predict the outcome of the legal challenges nor the timing of when this matter will be resolved. See Note 4 for additional information regarding the Four Corners SCR cost recovery.

Environmental Matters

APS is subject to numerous environmental laws and regulations affecting many aspects of its present and future operations, including air emissions of both conventional pollutants and greenhouse gases, water quality, wastewater discharges, solid waste, hazardous waste, and coal combustion residuals (“CCRs”).  These laws and regulations can change from time to time, imposing new obligations on APS resulting in increased capital, operating, and other costs.  Associated capital expenditures or operating costs could be material.  APS intends to seek recovery of any such environmental compliance costs through our rates but cannot predict whether it will obtain such recovery.  The following proposed and final rules involve material compliance costs to APS.
 
Regional Haze Rules.  APS has received the final rulemaking imposing pollution control requirements on Four Corners. EPA required the plant to install pollution control equipment that constitutes best available retrofit technology (“BART”) to lessen the impacts of emissions on visibility surrounding the plant. Based on EPA’s final standards, APS’s 63% share of the cost of required controls for Four Corners Units 4 and 5 was approximately $400 million, which has been incurred. 

In addition, EPA issued a final rule for Regional Haze compliance at Cholla that does not involve the installation of new pollution controls and that will replace an earlier BART determination for this facility. See “Cholla” in Note 4 for information regarding future plans for Cholla and details related to the resulting regulatory asset and see “Four Corners SCR Cost Recovery” above regarding recovery of the Four Corners SCR project.
 
Coal Combustion Waste. On December 19, 2014, EPA issued its final regulations governing the handling and disposal of CCR, such as fly ash and bottom ash. The rule regulates CCR as a non-hazardous waste under Subtitle D of the Resource Conservation and Recovery Act (“RCRA”) and establishes national minimum criteria for existing and new CCR landfills and surface impoundments and all lateral expansions. These criteria include standards governing location restrictions, design and operating criteria, groundwater monitoring and corrective action, closure requirements and post closure care, and recordkeeping, notification, and internet posting requirements. The rule generally requires any existing unlined CCR surface impoundment to stop receiving CCR and either retrofit or close, and further requires the closure of any CCR landfill or surface impoundment that cannot meet the applicable performance criteria for location restrictions or structural integrity. Such closure requirements are deemed “forced closure” or “closure for cause” of unlined surface impoundments and are the subject of recent regulatory and judicial activities described below.

Since these regulations were finalized, EPA has taken steps to substantially modify the federal rules governing CCR disposal. While certain changes have been prompted by utility industry petitions, others have resulted from judicial review, court-approved settlements with environmental groups, and statutory changes to RCRA. The following lists the pending regulatory changes that, if finalized, could have a material impact as to how APS manages CCR at its coal-fired power plants:
Following the passage of the Water Infrastructure Improvements for the Nation Act in 2016, EPA possesses authority to either authorize states to develop their own permit programs for CCR management or issue federal permits governing CCR disposal both in states without their own permit programs and on tribal lands. Although ADEQ has taken steps to develop a CCR permitting program, including the proposal of new state legislation providing ADEQ with appropriate permitting authority for CCR under the state solid waste management program, it is not clear when that program will be put into effect. On December 19, 2019, EPA proposed its own set of regulations governing the issuance of CCR management permits. The proposal remains pending.

On March 1, 2018, as a result of a settlement with certain environmental groups, EPA proposed adding boron to the list of constituents that trigger corrective action requirements to remediate groundwater impacted by CCR disposal activities. Apart from a subsequent proposal issued on August 14, 2019, to add a specific, health-based groundwater protection standard for boron, EPA has yet to take action on this proposal.

On November 4, 2019, EPA also proposed to change the manner by which facilities that have committed to cease burning coal in the near-term may qualify for alternative closure. Such qualification would allow CCR disposal units at these plants to continue operating, even though they would otherwise be subject to forced closure under the federal CCR regulations. EPA’s July 29, 2020, final regulation adopted this proposal and now requires explicit EPA approval for facilities to utilize an alternative closure deadline. With respect to the Cholla facility, APS’s application for alternative closure (which would allow the continued disposal of CCR within the facility’s existing unlined CCR surface impoundments until the required date for ceasing coal-fired boiler operations in April 2025) was submitted to EPA on November 30, 2020, and is currently pending. This application will be subject to public comment and, potentially, judicial review. EPA began taking action on these applications in January 2022, deeming APS’s application for the Cholla facility “complete.” We expect to have a proposed decision from EPA regarding Cholla later in 2022.

We cannot at this time predict the outcome of these regulatory proceedings or when the EPA will take final action on those matters that are still pending. Depending on the eventual outcome, the costs associated with APS’s management of CCR could materially increase, which could affect APS’s financial position, results of operations, or cash flows.

APS currently disposes of CCR in ash ponds and dry storage areas at Cholla and Four Corners. APS estimates that its share of incremental costs to comply with the CCR rule for Four Corners is approximately $30 million and its share of incremental costs to comply with the CCR rule for Cholla is approximately $16 million. The Navajo Plant disposed of CCR only in a dry landfill storage area. To comply with the CCR rule for the Navajo Plant, APS’s share of incremental costs was approximately $1 million, which has been incurred. Additionally, the CCR rule requires ongoing, phased groundwater monitoring.

As of October 2018, APS has completed the statistical analyses for its CCR disposal units that triggered assessment monitoring. APS determined that several of its CCR disposal units at Cholla and Four Corners will need to undergo corrective action. In addition, under the current regulations, all such disposal units must have ceased operating and initiated closure by April 11, 2021, at the latest (except for those disposal units subject to alternative closure). APS completed the assessments of corrective measures on June 14, 2019; however, additional investigations and engineering analyses that will support the remedy selection are still underway. In addition, APS will also solicit input from the public and host public hearings as part of this process. Based on the work performed to date, APS currently estimates that its share of corrective action and monitoring costs at Four Corners will likely range from $10 million to $15 million, which would be incurred over 30 years. The analysis needed to perform a similar cost estimate for Cholla remains ongoing at this time.
As APS continues to implement the CCR rule’s corrective action assessment process, the current cost estimates may change. Given uncertainties that may exist until we have fully completed the corrective action assessment process, we cannot predict any ultimate impacts to the Company; however, at this time we do not believe the cost estimates for Cholla and any potential change to the cost estimate for Four Corners would have a material impact on our financial position, results of operations or cash flows.

EPA Climate Regulations. On June 19, 2019, EPA took final action on its proposals to repeal EPA’s 2015 Clean Power Plan (“CPP”) and replace those regulations with a new rule, the Affordable Clean Energy (“ACE”) regulations. EPA originally finalized the CPP on August 3, 2015, and such rules would have had far broader impact on the electric power sector than the ACE regulations. On January 19, 2021, the U.S. Court of Appeals for the D.C. Circuit vacated the ACE regulations and remanded them back to EPA to develop new existing power plant carbon regulations consistent with the court’s ruling. That ruling endorsed an expansive view of the federal Clean Air Act consistent with EPA’s 2015 CPP. On October 29, 2021, the U.S. Supreme Court announced that it was accepting judicial review of the January 2021 D.C. Circuit decision vacating the ACE regulations. A decision from the U.S. Supreme Court is expected during the summer of 2022. While the Biden administration has expressed an intent to regulate carbon emissions in this sector more aggressively under the Clean Air Act, we cannot at this time predict the outcome of pending EPA rulemaking proceedings or ongoing litigation related to the scope of EPA’s authority under the Clean Air Act to regulate carbon emissions from existing power plants.

Other environmental rules that could involve material compliance costs include those related to effluent limitations, the ozone national ambient air quality standard and other rules or matters involving the Clean Air Act, Clean Water Act, Endangered Species Act, RCRA, Superfund, the Navajo Nation, and water supplies for our power plants. The financial impact of complying with current and future environmental rules could jeopardize the economic viability of our coal plants or the willingness or ability of power plant participants to fund any required equipment upgrades or continue their participation in these plants. The economics of continuing to own certain resources, particularly our coal plants, may deteriorate, warranting early retirement of those plants, which may result in asset impairments. APS would seek recovery in rates for the book value of any remaining investments in the plants as well as other costs related to early retirement but cannot predict whether it would obtain such recovery.

Four Corners National Pollutant Discharge Elimination System (“NPDES”) Permit

The latest NPDES permit for Four Corners was issued on September 30, 2019. Based upon a November 1, 2019, filing by several environmental groups, the Environmental Appeals Board (“EAB”) took up review of the Four Corners NPDES Permit. Oral argument on this appeal was held on September 3, 2020, and the EAB denied the environmental group petition on September 30, 2020. While the environmental groups had filed a petition for review of the EAB’s decision with the U.S. Court of Appeals for the Ninth Circuit, on May 2, 2022, the parties to the litigation executed a settlement agreement. We do not anticipate that this agreement will have a material impact on our financial position, results of operations, or cash flows.

Four Corners 4CA Matter

On July 6, 2016, 4CA purchased El Paso’s 7% interest in Four Corners. NTEC purchased this 7% interest on July 3, 2018, from 4CA. NTEC purchased the 7% interest at 4CA’s book value, approximately $70 million, and is paying 4CA the purchase price over a period of four years pursuant to a secured interest-bearing promissory note. The note is secured by a portion of APS’s payments to be owed to NTEC under the 2016 Coal Supply Agreement. As of March 31, 2022, the note has a remaining balance of $4.6 million. NTEC continues to make payments in accordance with the terms of the note. Due to its short-remaining term, among other factors, there are no expected credit losses associated with the note.
In connection with the sale, Pinnacle West guaranteed certain obligations that NTEC will have to the other owners of Four Corners, such as NTEC’s 7% share of capital expenditures and operating and maintenance expenses. Pinnacle West’s guarantee is secured by a portion of APS’s payments to be owed to NTEC under the 2016 Coal Supply Agreement.

Financial Assurances

In the normal course of business, we obtain standby letters of credit and surety bonds from financial institutions and other third parties. These instruments guarantee our own future performance and provide third parties with financial and performance assurance in the event we do not perform. These instruments support commodity contract collateral obligations and other transactions. As of March 31, 2022, standby letters of credit totaled $8 million and expire in 2023. As of March 31, 2022, surety bonds expiring through 2023 totaled $6 million. The underlying liabilities insured by these instruments are reflected on our balance sheets, where applicable. Therefore, no additional liability is reflected for the letters of credit and surety bonds themselves.

We enter into agreements that include indemnification provisions relating to liabilities arising from or related to certain of our agreements.  Most significantly, APS has agreed to indemnify the equity participants and other parties in the Palo Verde sale leaseback transactions with respect to certain tax matters.  Generally, a maximum obligation is not explicitly stated in the indemnification provisions and, therefore, the overall maximum amount of the obligation under such indemnification provisions cannot be reasonably estimated.  Based on historical experience and evaluation of the specific indemnities, we do not believe that any material loss related to such indemnification provisions is likely.

Pinnacle West has issued parental guarantees and has provided indemnification under certain surety bonds for APS which were not material at March 31, 2022. In connection with the sale of 4CA’s 7% interest to NTEC, Pinnacle West is guaranteeing certain obligations that NTEC will have to the other owners of Four Corners. (See “Four Corners — 4CA Matter” above for information related to this guarantee). Pinnacle West has not needed to perform under this guarantee. A maximum obligation is not explicitly stated in the guarantee and, therefore, the overall maximum amount of the obligation under such guarantee cannot be reasonably estimated; however, we consider the fair value of this guarantee, including expected credit losses, to be immaterial.

In connection with BCE’s acquisition of minority ownership positions in the Clear Creek and Nobles 2 wind farms, Pinnacle West has issued parental guarantees to guarantee the obligations of BCE subsidiaries to make required equity contributions to fund project construction (the “Equity Contribution Guarantees”) and to make production tax credit funding payments to borrowers of the projects (the “PTC Guarantees”). The amounts guaranteed by Pinnacle West are reduced as payments are made under the respective guarantee agreements. The Equity Contribution Guarantees remaining as of March 31, 2022, are immaterial in amount and the PTC Guarantees (approximately $36 million as of March 31, 2022) are currently expected to be terminated ten years following the commercial operation date of the applicable project.
In connection with the credit agreement entered into by a special purpose subsidiary of BCE on February 11, 2022, Pinnacle West has guaranteed the full amount of the equity bridge loan under the credit facility. See Note 3 for additional details.