STRONG Q4 CAPS GREAT YEAR

FOR BARRICK

 

All amounts expressed in U.S. dollars unless otherwise indicated

(Unaudited)

 

Toronto, February 12, 2020 — Barrick Gold Corporation’s gold production for 2019 of 5,465,000 ounces was at the top end of its guidance range while copper production of 432 million pounds was above the guidance range, the company reported today.

 

Announcing its results for the fourth quarter and the year, the company reported net earnings per share of $2.26 for the year and noted that its adjusted net earnings per share1 were up 46% year-on-year while debt net of cash was halved from 2018 to $2.2 billion. The quarterly dividend was increased by 40% from Q3, to $0.07 cents per share, which was itself a 25% increase from Q2.

 

In a presentation here, president and chief executive Mark Bristow said the successful formation of the Nevada Gold Mines joint venture during the year had resulted in the North American operations delivering at the midpoint of its production and cost guidance ranges. There were also strong performances from Barrick’s Latin American, Asia Pacific and Africa Middle East operations.

 

“In the year since the completion of Barrick’s merger with Randgold Resources, we have transformed the new company while creating the world’s largest gold mining complex in Nevada in a transaction that had been unsuccessfully pursued for two decades. The Acacia minorities’ buy-out enabled us to settle that company’s long-running dispute with the Tanzanian government and to integrate its assets into our operations. We’ve also started selling off non-core assets with the disposal of our stakes in the Kalgoorlie gold mine in Australia and the agreed sale of the Massawa project in Senegal,” Bristow said.

 

Continued on page 2

  

LOGO

 

LOGO


Financial and Operating

Highlights

(Unaudited)

 

  Financial Results   

Q4  

2019  

    

Q3  

2019  

     2019        2018    

Realized gold price3,4

     1,483          1,476          1,396          1,270    

($ per ounce)

           

Net earnings (loss)

     1,387          2,277          3,969          (1,545)    

($ millions)

           

Adjusted net earnings1

     300          264          902          409    

($ millions)

           

Net cash provided by operating activities

     875          1,004          2,833          1,765    

($ millions)

           

Free cash flow5

     429          502          1,132          365    

($ millions)

           

Net earnings (loss) per share ($)

     0.78          1.30          2.26          (1.32)    

Adjusted net earnings per share1 ($)

     0.17          0.15          0.51          0.35    

Total attributable capital expenditures6 ($ millions)

     393          397          1,512          1,363    
           
         

  Operating Results

 

  Gold

  

Q4  

2019  

    

Q3  

2019  

     2019        2018    

Production

     1,439          1,306          5,465          4,527    

(000s of ounces)

           

Cost of sales7 (Barrick’s share)

     1,046          1,065          1,005          892    

($ per ounce)

                  

Total cash costs8

     692          710          671          588    

($ per ounce)

           

All-in sustaining costs8

     923          984          894          806    

($ per ounce)

           

Copper

                                   

Production

     117          112          432          383    

(millions of pounds)

           

Cost of sales7 (Barrick’s share)

     2.26          2.00          2.14          2.40    

($ per pound)

           

C1 cash costs9

     1.90          1.62          1.69          1.97    

($ per pound)

           

All-in sustaining costs9

     2.82          2.58          2.52          2.82    

($ per pound)

           
                                     

Key Performance

Indicators

 

Full year gold production at upper end and copper production above guidance ranges

 

Gold costs per ounce down quarter on quarter

 

Debt net of cash at $2.2 billion, down 47% from 2018

 

Adjusted net earnings per share1 up 46% year on year

 

Increased efficiency drives significant year-over-year improvement in copper production and costs

 

Successful formation and integration of Nevada Gold Mines JV results in North American operations delivering at midpoint of its production and cost guidance ranges

 

Pueblo Viejo expansion evaluation and revised flowsheet enhances project

 

Strong performances across the board at Latin American, Asia Pacific and Africa Middle East operations

 

Proven and probable reserves increase net of depletion year-on-year at higher grade

 

Tanzanian disputes resolved with signing of framework agreement

 

Significant progress made in resolving tax related issues in Mali to pave the way for further investment in the country

 

Non-core asset disposals reinforce strategy of concentrated Tier One2 asset portfolio

 

Exceeded water recycling target of 70%; recycled >70% of water used at our sites

 

Another quarterly dividend increase, up 40% from Q3 to $0.07 per share

 

Continued from page 1

“We started the year with five Tier One2 gold mines and ended it with six, thanks to the Nevada deal. We’ve also succeeded in replenishing our reserves and resources, net of depletion, at a higher grade.”

Bristow said the pace of these achievements was attributable to a flattened management structure and the transfer of responsibilities from the corporate office to the operations.

“We now have agile multi-disciplinary teams capable not only of executing complex, industry-leading corporate transactions but also of running our operations efficiently while pursuing new growth opportunities,” he said.

“The significant reduction in Barrick’s debt and the growth in its liquidity means that the company is now capable of managing its business and taking advantage of new opportunities independent of the vagaries of the capital

 


markets. Our organic growth potential alone will support the 10-year production plan we’ll be sharing with the market in March and our exploration teams are stocking our future pipeline.”

Bristow noted that there was a strong focus on automation and clean energy across the group, while retaining and building on the operations’ social license remained a priority. Barrick’s commitment to sustainability is evidenced by the fact that more than 80% of the water used by our operations was recycled or reused.

“We believe that our ability to operate successfully depends on our ability to deliver long-term value to shareholders and other stakeholders, including the host countries, and on scrupulously managing our impact on the environment,” he said.

Conference Call and Webcast

Please join us for a conference call and webcast today at 11:00 ET/16:00 GMT to discuss the results.

US and Canada, 1-800-319-4610

UK, 0808 101 2791

International, +1 416 915-3239

Webcast

The webcast will remain on the website for later viewing, and the conference call will be available for replay by telephone at 1 855 669 9658 (US and Canada) and +1 604 674 8052 (international), access code 3969.

 

 

 

LOGO

BARRICK INCREASES DIVIDEND 40% FOR Q4 2019

 

Barrick Gold Corporation today announced that its Board of Directors has declared a dividend for the fourth quarter of 2019 of $0.07 per share, a 40% increase on the previous quarter’s dividend, payable on March 16, 2020 to shareholders of record at the close of business on February 28, 2020.10

Senior executive vice-president and chief financial officer Graham Shuttleworth said this was the third dividend increase this year and reflected the excellent performance for the year and Barrick’s profitability and financial strength.

“The board believes the dividend increase is justified by the significant reduction in net debt and strong balance sheet,

together with the growth in free cash flow supported by a robust 5-year plan which we have shared with the market,” said Shuttleworth.

“At the time the Barrick-Randgold merger was announced, the Q3 2018 dividend was 3 cents per share, which was subsequently increased to 4 cents for Q1 2019 after the merger, then increased to 5 cents for Q3 2019 on the back of our strong operating performance, and now to 7 cents for Q4. This is consistent with the company’s stated financial and operating objectives and in line with the commitment to shareholder returns made when the merger with Randgold was announced on September 24, 2018.”

 


LOGO

SUSTAINABILITY: AT THE HEART

OF BARRICK’S BUSINESS STRATEGY

Long before the current rise of investor interest in ESG (environmental, sustainability and governance) issues, Barrick and Randgold recognized that their ability to operate successfully was dependent on delivering long-term value to all stakeholders and to minimize their impact on the environment.

 

“At Barrick, ESG is not some box-ticking compliance function but a core strategy,” says president and chief executive Mark Bristow. “It starts at the top and permeates through the entire organization, and we believe that if it is managed well, it will drive our ability to deliver long-term profitability. It’s not only a social imperative - it’s a commercial one.”

Grant Beringer, Barrick’s group sustainability executive, says every site is expected to minimize water and energy use, manage waste and land responsibly, and put employee safety first. The operations promote the social and economic development of their communities, and work constantly to form and maintain mutually beneficial partnerships with their stakeholders. Putting ESG into practice requires

accountability to these stakeholders, which is why Barrick reports comprehensively and transparently on its sustainability performance and impacts.

“In 2019, there were no fatalities or high-impact environmental incidents at any of our sites. We recycled more than 70% of the water we used and we made significant progress in curbing our carbon emissions, phasing in solar power at Loulo-Gounkoto, converting the power plant at Pueblo Viejo to natural gas and linking Veladero with grid power. We also developed and implemented biodiversity action plans at our priority sites and we’re on track to roll these out across the group by 2021. Our investment in community development projects exceeded $23 million for the year,” he said.

 


LOGO

COMMITMENT TO EXCELLENCE IN GEOLOGY

SECURES SUSTAINABILITY

Barrick’s intensified focus on geocentric principles enables its geologists to increase existing reserves as well as to find their next major discovery, says Rob Krcmarov, executive vice-president, exploration and growth.

 

“Understanding the orebodies is the key to defining the revenue value of an asset as well as high-quality mine planning. It ensures that every bit of that value can be extracted safely and that the process maximizes the recovery rate,” he says.

“Loulo-Gounkoto and Cortez-Goldrush are prime examples of how orebody knowledge and quality geological work have delivered world-class discoveries, and there is an abundance of similar opportunities across our portfolio.”

Nevada Gold Mines’ holdings encompass more than one million hectares across some of the best-endowed gold trends in North America, and early versions of unified and more sophisticated geological models have already identified new areas of interest there. At Fourmile, the inferred resource was increased by more than 170%11 in 2019 thanks to an improved understanding of the mineralization controls, which also delivered a new high-grade discovery more than a kilometer from the main orebody.

In Latin America, the number of drill targets in the resource triangle had increased threefold by the end of the year. In the highly prospective and under-explored

El Indio belt, advances in exploration technology and improved ore deposit models are being employed to probe for concealed gold deposits.

At Porgera in Papua New Guinea, a new drill hole, hundreds of meters beyond the pit, has validated the exploration team’s prediction that the mineralized system is far larger than currently defined.

Africa remains a target-rich environment, with the Faraba complex in Mali and Bambadji in Senegal looking particularly promising. Both Loulo-Gounkoto in Mali and Kibali in the Democratic Republic of Congo continue to replace their reserves and develop their resource growth opportunities, while at the recently consolidated North Mara mine in Tanzania, a new orebody model has identified an abundant upside.

“All our Tier One2 mines have in excess of 10 years’ worth of reserves at a $1,200/oz gold price. We expect that many of these will yield extensions and additional discoveries and will be producing for years to come. It is significant in this regard to note that Barrick replaced its reserves net of depletion and at a higher grade in 2019,” says Krcmarov.

 


LOGO

BARRICK GROWS AND IMPROVES RESERVE AND RESOURCE BASE

IN A YEAR OF CHANGE

 

Barrick’s annual resource and reserve declaration, published today as part of its fourth quarter results, shows an attributable gold mineral reserve increase of 14.5% in ounces at 7.7% higher grade after depletion from mining, reflecting a busy year which included the incorporation of Randgold Resources, the formation of the Nevada Gold Mines joint venture with Newmont and the disposal of KCGM. Attributable reserves now stand at 1,300 million tonnes at 1.68 g/t for 71 million ounces of gold.12 This has been achieved through reserve additions greater than mining depletion at a number of our principal assets including Kibali, Loulo-Gounkoto, Veladero, Porgera, Goldstrike underground mine, Leeville/Portal underground mines, Mega Pit, Turquoise Ridge underground mine, and Phoenix. This was achieved through the refocus on geology as a core discipline within the business and cost improvements at the Nevada joint venture, which allowed for the lowering of cut-off grades and the increase in reserves.

Global attributable mineral resources also increased, net of depletion with significant inferred mineral resource additions at Robertson and Fourmile in the Cortez district of Nevada, moving these new projects up the resource triangle. Goldrush, Robertson, and Pueblo Viejo contain significant indicated and inferred mineral resources not currently in reserves and are three growth projects from which further reserve growth can be expected in the near future upon completion of feasibility studies. Total attributable measured and indicated mineral resources, now reported inclusive of reserves and at a $1,500/oz gold price stand at 3,400 million tonnes at 1.55 g/t for 170 million ounces, with a further 940 million tonnes at 1.30 g/t for 39 million ounces in the inferred category, highlight the potential for growth in a higher gold price environment.12 All underground mineral resources are now reported within $1,500/oz stope optimizer shells and as such have shown significant growth in ounces albeit at lower grade, but which better reflects the opportunity at higher gold prices.

The Group gold mineral reserve reconciliation is supplied below and explains the changes that occurred during the year. Acquisition and disposal includes the net change to Barrick’s reserves from the Randgold merger, the formation of the

Nevada joint venture, the Acacia minorities’ acquisition, and the disposition of KCGM. Total depletion includes depletion from mining which was offset by gains due to extensions to mineral reserves through drilling and cut-off grade changes. Losses incurred were comprised primarily of the reclassification of Lagunas Norte to mineral resources, plus the removal of the Phase Six pit pushback at Hemlo.

 

LOGO

All assets are optimized on the full value of the deposit and as such copper and silver are reported as dedicated mineral resources and reserves for all assets where copper or silver is produced and sold as a primary product or by-product. Total attributable copper mineral reserves now stand at 1,600 million tonnes at 0.38% for 13 billion pounds of contained copper.12 The growth of copper mineral reserves was primarily driven by Lumwana due to the reclassification and remodeling of the Chimiwungo pit and cost improvements, with a small contribution from Zaldivar.

 

LOGO

Total attributable silver mineral reserves are 900 million tonnes at 5.03 g/t for 150 million ounces of contained silver.12

 


LOGO

TAKING TECH TO THE NEXT LEVEL

Trials and projects designed to make Barrick’s operations more efficient as well as safer are driving the increased use of technology and automation across the group.

 

Centres of excellence have been established to advance autonomous applications for both surface and underground operations. This means that rather than having a range of operations trialing different systems, these will be proven on both technological and operating cost grounds at the centres. Should they pass these filters, they will be rolled out across the group.

In Nevada, which is the centre of surface automation and technology development for Barrick, the first stage of a project designed to enable the retrofitting of an autonomous system for Carlin’s haulage fleet has been completed successfully. A number of trucks have already been retrofitted and work is now under way on increasing their speed from 15km/h to 35km/h, and installing portable locators that will allow manned and unmanned operations in the same zone. Following the creation of the Nevada Gold Mines JV, the autonomous drilling trials Barrick and Newmont had been running with different systems have been consolidated and will be tested at Phoenix and Lone Tree this year.

Kibali remains at the leading edge of underground automation in the global gold mining industry. After the implementation of the Sandvik Automine Multifleet system, which allows

multiple autonomous machines to operate on the same haulage level; a trial to utilize this technology on the production levels has been completed successfully. Using the same operations centre as the haulage system, one operator can now control up to three machines acting semi-autonomously in three different zones.

Also at Kibali, the installation of the Newtrax system, which provides real-time visibility of the underground operations, including personnel and equipment tracking and proximity warning, machine health and productivity as well as automated control of ventilation fans, was completed and will be fully commissioned in Q1 of 2020.

With the rapid development of electric vehicles, Barrick has introduced a battery-powered development drill at Hemlo in a first step towards establishing the potential of this new technology. Further trials of battery equipment are planned, predominantly at Turquoise Ridge’s underground operation, where it offers the potential of increasing production without having to make significant changes to the ventilation system.

 


LOGO

PEOPLE MAKE A BUSINESS

To build a modern mining business at the top of its field, you need best-in-class people to run its portfolio of best-in-class assets, says president and chief executive Mark Bristow.

 

“That is why we are promoting a culture of inclusion across the organization and at every level. We’ve flattened the corporate structure to create a larger ownership base, we’re sharing our strategic vision with all employees and the roll-out of team effectiveness programs is reinforcing their understanding of and commitment to our high-performance ethos. I want everyone to come to work in the morning inspired by the desire to help make Barrick the world’s safest, most efficient, and most highly valued company,” he says.

Attracting, training and retaining the right people is obviously the basis of this employee-oriented philosophy. Barrick offers

 

LOGO

Pictured: Poupak Bahamin, Barrick’s deputy general counsel

executive and management development programs at leading universities to foster its next generation of world-class leaders. It also invests in and mentors young professionals through rotational training and internship programs for college graduates.

“Our successful recruitment drive is filling our pipeline of future talent with people who come from a broad range of backgrounds but who all have the desire and the ability to buy into the Barrick DNA,” Bristow says.

KEEPING OUR COUNSEL

Rich Haddock has decided to defer his retirement and returns as Barrick’s general counsel in order, he says, to participate in the exciting new developments at the company. He joined Barrick in 1997 and has been involved in some of the most important steps in its growth.

Poupak Bahamin has joined Barrick as deputy general counsel from Norton Rose Fulbright, where she was a partner and co-led its US mining practice. She is the current chair of the World Association of Mining Lawyers.

 


LOGO

EXPANSION PROJECT WILL UNLOCK VALUE, EXTEND

LIFE AT PUEBLO VIEJO

Studies continue to support a plant expansion project which will confirm Pueblo Viejo’s status as one of the world’s greatest gold mines by extending its life beyond 2040 at a production rate of some 800,000 ounces per year.13

 

Barrick president and chief executive Mark Bristow says a substantial portion of the mine’s mineral resources would have been sterilized by the limitation of its tailings storage facility. Alongside the plant expansion project, which will significantly boost throughput, the planned increase in the mine’s tailings management capacity has the potential to convert roughly 11 million ounces of indicated resources to reserves on a 100% basis.

“A study completed last quarter indicated that the throughput increase can be achieved without additional autoclaves. An oxidation upgrade will provide the required capacity at a lower capital and operating cost than the options previously considered,” explained John Steele, Barrick’s Metallurgy, Engineering and Capital Projects Executive.

 

Pueblo Viejo currently has 9.5 million ounces of gold in reserves. Total measured and indicated mineral resources contain 25 million ounces and thus offer a significant opportunity to expand reserves.14

The mine is an important component of the Dominican Republic’s economy, contributing more than 20% of the country’s annual corporate tax revenue. It operates in close partnership with the government and the community, and recently committed its support for the development of a local cacao-based agribusiness.

 


LOGO

BARRICK BACK IN BUSINESS IN TANZANIA

Barrick says it has made significant progress in reshaping the Tanzanian operations it consolidated through the take-over of Acacia Mining in September last year in order to create a sustainable business capable of long-term value creation for its stakeholders.

 

At a signing ceremony with the President of the United Republic of Tanzania, Dr John Pombe Magufuli, to formalize the establishment of a joint venture between Barrick and the government, Bristow said the joint venture, which will give the government full visibility of and participation in operating decisions made for and by the North Mara, Bulyanhulu and Buzwagi mines, was a pioneering move which would take Barrick’s policy of partnership with its host countries to a new level.

The agreement also ratifies the creation of Twiga Minerals Corporation, the management company jointly owned by the government and Barrick, that will oversee the management of Barrick’s local operations, which are now owned 84% by Barrick and 16% by the government. The deal provides for a 50/50 sharing in the economic benefits generated by the mining operations after the recoupment of capital investments.

Following the ceremony, there are a number of matters which Barrick and the government will work together to implement. In particular, Barrick will partner with the University of Dar es Salaam and commit up to $10 million in funding over a 10-year period for training and skills development in the mining industry, and will also commit up to $40 million to upgrade the road between Bulyanhulu and Mwanza as well as constructing a housing compound and related infrastructure.

“Since taking over the operatorship, we have been engaging with local communities to restore the mines’ social license to

operate and we are cooperating closely with the authorities to address the environmental issues at North Mara. In addition, we are working on a local supplier strategy as well as a community development plan to create sustainable economic opportunities for the people around our mines”, Bristow said.

Bristow said there was a strong focus on rationalizing and optimizing mine plans. Following the successful transition to owner mining at North Mara, this has already delivered a reduction in costs and an increase in free cash flow. A similar result is expected at Bulyanhulu, where an integrated study aimed at optimizing the complete orebody should kick-start the resumption of operations there later this year.

“Reflecting our confidence in the potential of this highly prospective gold region, we have budgeted $50 million for brown and greenfields exploration here in 2020 alone and are looking at various opportunities to sustain and expand our operations,” Bristow said.

In line with Barrick’s commitment to employing and advancing locals at its mines, Tanzanian nationals are being recruited and trained to replace expatriate employees as has been done successfully at Barrick’s other African operations. In addition, Acacia’s offices outside Tanzania have been closed, and company records and day-to-day decision-making and accountability have been moved back to the operations in Tanzania.

 


LOGO

PIONEERING PARTNERSHIP WITH TANZANIA OFF TO
A STRONG START

Twiga Minerals Corporation, the recently formed joint venture between the Tanzanian government and Barrick, has had its first two board meetings, and Willem Jacobs, Barrick’s chief operating officer for Africa and the Middle East, says the positive energy in the room was palpable.

 

“Twiga has made a strong start, we’re getting the Tanzanian operations back on track and we’re building a strong foundation for sustainable profitability,” says Jacobs. “We recognize that there’s still a long way to go, considering that we also have to repair the damage these assets suffered during the previous operator’s long stand-off with the government,” he said.

“There are many examples of exploitation by the extractive industries, as well as their hosts. With their short-term focus, these enterprises are incapable of delivering sustainable profitability. Similarly, those governments which flirt with resource nationalization fail to see that the engine of profitability drives their economies. With its ‘Win Together, Lose Together’ creed, Twiga is a true partnership which will create long-term benefits and share them equally.”

 


LOGO

KIBALI SOARS PAST GUIDANCE

TO POST ANOTHER RECORD YEAR

 

Barrick Gold Corporation’s Kibali mine beat its 2019 production guidance of 750,000 ounces of gold by a substantial margin, delivering 814,027 ounces in another record year.15

Barrick president and chief executive Mark Bristow told a media briefing here that Kibali’s continuing stellar performance was a demonstration of how a modern, Tier One2 gold mine could be developed and operated successfully in what is one of the world’s most remote and infrastructurally under-endowed regions. He also noted that in line with Barrick’s policy of employing, training and advancing locals, the mine was managed by a majority Congolese team, supported by a corps of majority Congolese supervisors and personnel.

Already one of the world’s most highly automated underground gold mines, Kibali continues its technological advance with the introduction of truck and drill training simulators and the integration of systems for personnel safety tracking and ventilation demand control. The simulators will also be used to train operators from Barrick’s Tanzanian mines.

“The completion of the Kalimva-Ikamva prefeasibility study has delivered another viable opencast project which will help balance Kibali’s opencast/underground ore ratio and enhance

the flexibility of the mine plan. Down-plunge extension drilling at Gorumbwa has highlighted future underground potential and ongoing conversion drilling at KCD is delivering reserve replenishment. All in all, Kibali is well on track not only to meet its 10-year production targets but to extend them beyond this horizon,” Bristow said.

“We’re maintaining a strong focus on energy efficiency through the development of our grid stabilizer project, scheduled for commissioning in the second quarter of 2020. This uses new battery technology to offset the need for running diesel generators as a spinning reserve and ensures we maximize the use of renewable hydro power. The installation of three new elution diesel heaters will also help improve efficiencies and control power costs. It’s worth noting that our clean energy strategy not only achieves cost and efficiency benefits but also once again reduces Kibali’s environmental footprint.”

Bristow said despite the pace of production and the size and complexity of the mine, Kibali was maintaining its solid safety and environmental records, certified by ISO 45001 and ISO 14001 accreditations. It also remained committed to community upliftment and local economic development. In 2019, it spent $158 million with Congolese contractors and suppliers and in December, it started work on a trial section for a new concrete road between Durba and the Watsa bridge.

 


LOGO

LOULO-GOUNKOTO COMMITS TO NEW DECADE OF

DELIVERY AND INVESTMENT

 

Barrick Gold Corporation’s Loulo-Gounkoto complex has again demonstrated its mettle, exceeding its 2019 guidance with production of 714,802 ounces of gold.16

Barrick’s president and chief executive Mark Bristow told a briefing for local media that the complex continued to perform consistently to plan and was still managing to replace depleted reserves through successful brownfields exploration and resource conversion.

“With the development of the complex’s third underground mine scheduled to start in the fourth quarter of this year, and an intensive exploration program in the Kenieba region, Loulo-Gounkoto has significant growth potential and is well-placed to meet all the targets of its 10-year plan,” he said.

In line with Barrick’s clean energy strategy, Loulo-Gounkoto is pioneering the group’s first solar power project. This is being developed in four phases, with the first scheduled for commissioning at the end of the first quarter and the last in the fourth quarter of this year. It will add 20MW to the complex’s grid, reduce the unit cost of its power and cut carbon emissions by some 40,000 tonnes per year. Bristow said it would serve as a model for the introduction of solar power elsewhere across Barrick, particularly at its North American operations.

Also being implemented at present is the Ramjack Newtrax project, which is setting the foundation for the automation and monitoring of the complex’s underground mines through a fiber network.

Despite the high activity level, the complex maintained its solid safety record with Lost Time Injuries (LTIs) at Loulo decreasing from four to two year-on-year, and Gounkoto recording its second successive LTI-free year.

Bristow said Loulo-Gounkoto continued to invest in community health, education, and economic development programs. One of these is the agricultural complex established and funded to the tune of $2.2 million.

This has produced its first crop of 48 young farmers who have been installed on 30 new farms and provided not only with the necessary technical and entrepreneurial skills, but with the credit to apply these effectively.

During 2019, Loulo-Gounkoto spent $313 million with local contractors and suppliers and continued developing local businesses by creating a $500,000 provision for an incubation project designed to incorporate local contractors into the mining industry.

“Over the past 23 years, Barrick and its legacy company Randgold Resources have contributed $7.2 billion to the Malian economy in the form of taxes, royalties, salaries and payments to local suppliers. Over the same period, our mines in Mali paid $2.7 billion in dividends, taxes and royalties to the state - almost three times the $1 billion dividend received by Barrick,” Bristow said.

“It is a cardinal principle of Barrick that our host countries and communities should share equitably in the benefits created by our operations. Some, such as skills development and employment creation, cannot be measured, but as these figures demonstrate, the quantifiable value we deliver to Mali is very substantial,” Bristow said.

“This is also the product of a long and constructive partnership between the government of Mali and ourselves, and in this regard it is gratifying to report that we have made significant progress towards settling the dispute between us over tax and related issues which allows us to look forward to continuing to grow our partnership with the Mali government and its people.”

 


Appendix 1

2020 Operating and Capital Expenditure Guidance

 

GOLD PRODUCTION AND COSTS

 

     2020 forecast attributable      2020 forecast cost of      2020 forecast total cash      2020 forecast all-in  
     production (000s ozs)      sales7 ($/oz)      costs8 ($/oz)      sustaining costs($/oz)  

Carlin (61.5%)17,18

     1,000 - 1,050        920 -970        760 - 810        1,000 - 1,050  

Cortez (61.5%)17

     450 - 480        980 - 1,030        640 - 690        910 - 960  

Turquoise Ridge(61.5%)17

     430 - 460        900 - 950        540 - 590        690 - 740  

Phoenix (61.5%)17

     100 - 120        1,850 - 1,900        700 - 750        920 - 970  

Long Canyon (61.5%)17

     130 - 150        910 - 960        240 - 290        450 - 500  

Nevada Gold Mines(61.5%)

     2,100 - 2,250        970 - 1,020        660 - 710        880 - 930  

Hemlo

     200 - 220        960 - 1,010        800 - 850        1,200 - 1,250  

North America

     2,300 - 2,450        970 - 1,020        660 - 710        900 - 950  

Pueblo Viejo (60%)

     530 - 580        840 - 890        520 - 570        720 - 770  

Veladero (50%)

     240 - 270        1,220 - 1,270        670 - 720        1,250 - 1,300  

Porgera (47.5%)

     240 - 270        890 - 940        770 - 820        960 - 1,010  

Latin America & Asia Pacific

     1,000 - 1,100        930 - 980        610 - 660        890 - 940  

Loulo-Gounkoto (80%)

     500 - 540        1,050 - 1,100        620 - 670        970 - 1,020  

Kibali (45%)

     340 - 370        1,030 - 1,080        600 - 650        790 - 840  

North Mara19

     240 - 270        750 - 800        570 - 620        830 - 880  

Tongon (89.7%)

     240 - 260        1,390 - 1,440        680 - 730        740 - 790  

Bulyanhulu19

     30 - 50        1,210 - 1,260        790 - 840        1,110 - 1,160  

Buzwagi 19

     80 - 100        850 - 900        820 - 870        850 - 900  
         

  Africa & Middle East

     1,450 - 1,600        1,040 - 1,090        640 - 690        870 - 920  

  Total Attributable to Barrick20,21,22,23

     4,800 - 5,200        980 - 1,030        650 - 700        920 - 970  
           

  COPPER PRODUCTION AND COSTS

 

      2020 forecast attributable
production (M lbs)
     2020 forecast cost of
sales7 ($/lb)
     2020 forecast C1 cash
costs9 ($/lb)
     2020 forecast all-in
sustaining costs($/lb)
 

Lumwana

     250 - 280        2.20 - 2.40        1.50 - 1.70        2.30 - 2.60  

Zaldívar (50%)

     120 - 135        2.40 - 2.70        1.65 - 1.85        2.30 - 2.60  

Jabal Sayid (50%)

     60 - 70        1.75 - 2.00        1.40 - 1.60        1.50 - 1.70  
         

  Total Copper22

     440 - 500        2.10 - 2.40        1.50 - 1.80        2.20 - 2.50  
           

  CAPITAL EXPENDITURES

 

                          
                              ($ millions)  

Attributable minesite sustaining

 

           1,300 - 1,500  

Attributable project

              300 - 400  

  Total attributable capital expenditures 24

 

                       1,600 - 1,900  

 

BARRICK YEAR-END 2019    14    PRESS RELEASE


Appendix 2

Production and Cost Summary

Production and Cost Summary - Gold

 

  (Unaudited)    For the three months ended      For the years ended          
      12/31/2019      9/30/2019      % Change      12/31/2019      12/31/2018      % Change  

  Nevada Gold Mines LLC (61.5%)a

                 

Gold produced (000s oz attributable basis)

     585        535        9 %        2,218        2,368        (6)%  

Gold produced (000s oz 100% basis)

     951        870        9 %        2,967        2,457        21 %  

Cost of sales ($/oz)

     1,038        1,027        1 %        924        814        13 %  

Total cash costs ($/oz)b

     711        693        3 %        634        526        20 %  

All-in sustaining costs ($/oz)b

     944        946        0 %        828        664        25 %  

Cortez (61.5%)c

                 

Gold produced (000s oz attributable basis)

     133        126        6 %        801        1,265        (37)%  

Gold produced (000s oz 100% basis)

     216        205        6 %        963        1,265        (24)%  

Cost of sales ($/oz)

     945        829        14 %        762        659        16 %  

Total cash costs ($/oz)b

     681        570        19 %        515        351        47 %  

All-in sustaining costs ($/oz)b

     1,012        772        31 %        651        430        51 %  

Carlin (61.5%)d

                 

Gold produced (000s oz attributable basis)

     276        278        (1)%        968        835        16 %  

Gold produced (000s oz 100% basis)

     449        452        (1)%        1,315        835        57 %  

Cost of sales ($/oz)

     975        1,007        (3)%        1,004        1,054        (5)%  

Total cash costs ($/oz)b

     766        775        (1)%        746        740        1 %  

All-in sustaining costs ($/oz)b

     965        1,014        (5)%        984        983        0 %  

Turquoise Ridge (61.5%)e

                 

Gold produced (000s oz attributable basis)

     111        82        35 %        335        268        25 %  

Gold produced (000s oz 100% basis)

     181        133        35 %        504        357        41 %  

Cost of sales ($/oz)

     971        1,077        (10)%        846        783        8 %  

Total cash costs ($/oz)b

     625        622        0 %        585        678        (14)%  

All-in sustaining costs ($/oz)b

     800        840        (5)%        732        756        (3)%  

Phoenix (61.5%)f

                 

Gold produced (000s oz attributable basis)

     31        25        24 %        56        

Gold produced (000s oz 100% basis)

     50        41        24 %        91        

Cost of sales ($/oz)

     2,025        2,186        (7)%        2,093        

Total cash costs ($/oz)b

     902        1,010        (11)%        947        

All-in sustaining costs ($/oz)b

     1,034        1,622        (36)%        1,282        

Long Canyon (61.5%)f

                 

Gold produced (000s oz attributable basis)

     34        24        42 %        58        

Gold produced (000s oz 100% basis)

     55        39        42 %        94        

Cost of sales ($/oz)

     1,026        1,170        (12)%        1,088        

Total cash costs ($/oz)b

     317        353        (10)%        333        

All-in sustaining costs ($/oz)b

     657        714        (8)%        681                    

  Pueblo Viejo (60%)

                 

Gold produced (000s oz attributable basis)

     179        139        29 %        590        581        2 %  

Gold produced (000s oz 100% basis)

     298        232        29 %        983        968        2 %  

Cost of sales ($/oz)

     660        807        (18)%        747        750        0 %  

Total cash costs ($/oz)b

     422        504        (16)%        471        465        1 %  

All-in sustaining costs ($/oz)b

     517        631        (18)%        592        623        (5)%  

 

BARRICK YEAR-END 2019    15    PRESS RELEASE


Production and Cost Summary - Gold (continued)

 

  (Unaudited)    For the three months ended      For the years ended          
      12/31/2019      9/30/2019      % Change      12/31/19      12/31/18      % Change  

  Loulo-Gounkoto (80%)g

                                                     

Gold produced (000s oz attributable basis)

     144        153        (6)%        572        

Gold produced (000s oz 100% basis)

     180        191        (6)%        715        

Cost of sales ($/oz)

     1,037        1,018        2 %        1,044        

Total cash costs ($/oz)b

     631        630        0 %        634        

All-in sustaining costs ($/oz)b

     917        966        (5)%        886        

  Kibali (45%)g

                                                     

Gold produced (000s oz attributable basis)

     87        91        (4)%        366        

Gold produced (000s oz 100% basis)

     193        202        (4)%        813        

Cost of sales ($/oz)

     1,205        1,187        2 %        1,111        

Total cash costs ($/oz)b

     608        554        10 %        568        

All-in sustaining costs ($/oz)b

     740        703        5 %        693        

  Kalgoorlie (50%)h

                                                     

Gold produced (000s oz attributable basis)

     36        58        (38)%        206        314        (34)%  

Gold produced (000s oz 100% basis)

     72        116        (38)%        413        628        (34)%  

Cost of sales ($/oz)

     1,127        1,037        9 %        1,062        899        18 %  

Total cash costs ($/oz)b

     940        856        10 %        873        732        19 %  

All-in sustaining costs ($/oz)b

     1,172        1,170        0 %        1,183        857        38 %  

  Tongon (89.7%)g

                                                     

Gold produced (000s oz attributable basis)

     61        62        (2)%        245        

Gold produced (000s oz 100% basis)

     68        69        (2)%        273        

Cost of sales ($/oz)

     1,476        1,396        6 %        1,469        

Total cash costs ($/oz)b

     803        793        1 %        787        

All-in sustaining costs ($/oz)b

     867        869        0 %        844        

  Porgera (47.5%)

                                                     

Gold produced (000s oz attributable basis)

     82        75        9 %        284        204        39 %  

Gold produced (000s oz 100% basis)

     172        158        9 %        597        429        39 %  

Cost of sales ($/oz)

     909        1,024        (11)%        994        996        0 %  

Total cash costs ($/oz)b

     757        868        (13)%        838        796        5 %  

All-in sustaining costs ($/oz)b

     894        1,053        (15)%        1,003        1,083        (7)%  

  Veladero (50%)i

                                                     

Gold produced (000s oz attributable basis)

     71        58        22 %        274        278        (1)%  

Gold produced (000s oz 100% basis)

     142        116        22 %        548        556        (1)%  

Cost of sales ($/oz)

     1,138        1,243        (8)%        1,188        1,112        7 %  

Total cash costs ($/oz)b

     710        773        (8)%        734        629        17 %  

All-in sustaining costs ($/oz)b

     1,142        1,142        0 %        1,105        1,154        (4)%  

  Hemlo

                                                     

Gold produced (000s oz)

     54        49        10 %        213        171        25 %  

Cost of sales ($/oz)

     1,632        1,083        51 %        1,137        1,157        (2)%  

Total cash costs ($/oz)b

     1,091        953        14 %        904        1,046        (14)%  

All-in sustaining costs ($/oz)b

     1,380        1,280        8 %        1,140        1,318        (14)%  

  North Maraj

                                                     

Gold produced (000s oz attributable basis)

     103        29        255 %        251        215        17 %  

Gold produced (000s oz 100% basis)

     103        45        129 %        334        336        (1)%  

Cost of sales ($/oz)

     1,021        907        13 %        953        795        20 %  

Total cash costs ($/oz)b

     675        603        12 %        646        603        7 %  

All-in sustaining costs ($/oz)b

     830        850        (2)%        802        830        (3)%  

 

BARRICK YEAR-END 2019    16    PRESS RELEASE


                                                                                                                             
  (Unaudited)    For the three months ended      For the years ended          
      12/31/2019      9/30/2019      % Change      12/31/19      12/31/18      % Change  

  Buzwagij

                 

Gold produced (000s oz attributable basis)

     28        18        56 %        83        93        (11)%  

Gold produced (000s oz 100% basis)

     28        28        — %        115        146        (21)%  

Cost of sales ($/oz)

     1,235        1,292        (4)%        1,240        939        32 %  

Total cash costs ($/oz)b

     1,144        1,202        (5)%        1,156        916        26 %  

All-in sustaining costs ($/oz)b

     1,169        1,220        (4)%        1,178        947        24 %  

  Bulyanhuluj

                 

Gold produced (000s oz attributable basis)

     9        6        50 %        27        26        4 %  

Gold produced (000s oz 100% basis)

     9        9        — %        37        41        (10)%  

Cost of sales ($/oz)

     1,293        1,288        0 %        1,207        1,231        (2)%  

Total cash costs ($/oz)b

     752        729        3 %        676        650        4 %  

All-in sustaining costs ($/oz)b

     909        769        18 %        773        754        3 %  

  Total Attributable to Barrickk

                 

Gold produced (000s oz attributable basis)

     1,439        1,306        10 %        5,465        4,527        21 %  

Cost of sales ($/oz)l

     1,046        1,065        (2)%        1,005        892        13 %  

Total cash costs ($/oz)b

     692        710        (3)%        671        588        14 %  

All-in sustaining costs ($/oz)b

     923        984        (6)%        894        806        11 %  
a.

Represents the combined results of Cortez, Goldstrike (including our 60% share of South Arturo) and our 75% interest in Turquoise Ridge until June 30, 2019. Commencing July 1, 2019, the date Nevada Gold Mines was established, the results represent our 61.5% interest in Cortez, Carlin (including Goldstrike and 60% of South Arturo), Turquoise Ridge (including Twin Creeks), Phoenix and Long Canyon.

b.

These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the press release to the most directly comparable IFRS measure, please see pages 91 to 112 of our fourth quarter 2019 MD&A.

c.

On July 1, 2019, Cortez was contributed to Nevada Gold Mines, a joint venture with Newmont. As a result, the amounts presented are on an 100% basis up until June 30, 2019, and on a 61.5% basis thereafter.

d.

On July 1, 2019, Barrick’s Goldstrike and Newmont’s Carlin were contributed to Nevada Gold Mines and are now referred to as Carlin. As a result, the amounts presented represent Goldstrike on a 100% basis (including our 60% share of South Arturo) up until June 30, 2019, and the combined results of Carlin and Goldstrike (including our 60% share of South Arturo) on a 61.5% basis thereafter.

e.

Barrick owned 75% of Turquoise Ridge through to the end of the second quarter of 2019, with our joint venture partner, Newmont, owning the remaining 25%. Turquoise Ridge was proportionately consolidated on the basis that the joint venture partners that have joint control have rights to the assets and obligations for the liabilities relating to the arrangement. The figures presented in this table are based on our 75% interest in Turquoise Ridge until June 30, 2019. On July 1, 2019, Barrick’s 75% interest in Turquoise Ridge and Newmont’s Twin Creeks and 25% interest in Turquoise Ridge were contributed to Nevada Gold Mines. Starting July 1, 2019, the results represent our 61.5% share of Turquoise Ridge and Twin Creeks, now referred to as Turquoise Ridge.

f.

These sites were acquired as a result of the formation of Nevada Gold Mines on July 1, 2019.

g.

These sites did not form a part of the Barrick consolidated results in 2018 and 2017 as these sites were acquired as a result of the Merger.

h.

On November 28, 2019, we completed the sale of our 50% interest in Kalgoorlie in Western Australia to Saracen Mineral Holdings Limited for total cash consideration of $750 million. Accordingly, these represent our 50% interest until November 28, 2019.

i.

On June 30, 2017, we sold 50% of Veladero; therefore, these represent results on a 100% basis from January 1 to June 30, 2017 and on a 50% basis from July 1, 2017 onwards

j.

Formerly known as Acacia Mining plc. On September 17, 2019, Barrick acquired all of the shares of Acacia it did not own. Operating results are included at 100% from October 1, 2019 (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience) up until the GoT’s 16% free-carried interest is made effective, which is expected to be January 1, 2020, and on an 84% basis thereafter.

k.

With the end of mining at Golden Sunlight and Morila in the second quarter and Lagunas Norte in the third quarter as previously reported, we have ceased to include production or non-GAAP cost metrics for these sites from July 1, 2019 and October 1, 2019, respectively, onwards although these sites are included in the Total Attributable to Barrick in the prior period comparatives.

l.

Cost of sales per ounce (Barrick’s share) is calculated as cost of sales - gold on an attributable basis (excluding sites in care and maintenance) divided by gold equity ounces sold.

 

BARRICK YEAR-END 2019    17    PRESS RELEASE


Production and Cost Summary - Copper

 

                                                                                                                             
  (Unaudited)    For the three months ended      For the years ended          
      12/31/2019      9/30/2019      % Change      12/31/19      12/31/18      % Change  

  Lumwana

                 

Copper production (millions lbs)

     63        65        (3)%        238        224        6 %  

Cost of sales ($/lb)

     2.22        2.04        9 %        2.13        2.51        (15)%  

C1 cash costs ($/lb)a

     2.10        1.83        15 %        1.79        2.08        (14)%  

All-in sustaining costs ($/lb)a

     3.41        3.66        (7)%        3.04        3.08        (1)%  

  Zaldívar (50%)

                 

Copper production (millions lbs attributable basis)

     36        32        13 %        128        104        23 %  

Copper produced (millions lbs 100% basis)

     72        64        13 %        256        208        23 %  

Cost of sales ($/lb)

     2.59        2.18        19 %        2.46        2.55        (4)%  

C1 cash costs ($/lb)a

     1.95        1.55        26 %        1.77        1.97        (10)%  

All-in sustaining costs ($/lb)a

     2.56        1.91        34 %        2.15        2.47        (13)%  

  Jabal Sayid (50%)

                 

Copper production (millions lbs attributable basis)

     18        15        20 %        66        55        20 %  

Copper produced (millions lbs 100% basis)

     36        30        20 %        132        110        20 %  

Cost of sales ($/lb)

     1.47        1.63        (10)%        1.53        1.73        (12)%  

C1 cash costs ($/lb)a

     1.29        1.42        (9)%        1.26        1.53        (18)%  

All-in sustaining costs ($/lb)a

     1.78        1.65        8 %        1.51        1.92        (21)%  

  Total Copper

                 

Copper production (millions lbs attributable basis)

     117        112        4 %        432        383        13 %  

Cost of sales ($/lb)b

     2.26        2.00        13 %        2.14        2.40        (11)%  

C1 cash costs ($/lb)a

     1.90        1.62        17 %        1.69        1.97        (14)%  

All-in sustaining costs ($/lb)a

     2.82        2.58        9 %        2.52        2.82        (11)%  

 

a.

These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 91 to 112 of our fourth quarter 2019 MD&A.

b.

Cost of sales per pound (Barrick’s share) is calculated as cost of sales - copper plus our equity share of cost of sales attributable to Zaldívar and Jabal Sayid divided by copper pounds sold.

 

BARRICK YEAR-END 2019    18    PRESS RELEASE


Appendix 3

2020 Outlook Assumptions and Economic Sensitivity Analysis

Outlook Assumptions and Economic Sensitivity Analysis

 

         
      2020 Guidance
Assumption
   Hypothetical Change    Impact on EBITDA
(millions)25
   Impact on All-in
    Sustaining Costs8,9    

Gold revenue, net of royalties

   $1,350/oz    +/- $100/oz    +/- $472    +/- $4/oz

Copper revenue, net of royalties

   $2.75/lb    +/- $0.50/lb    +/- $224    +/- $0.02/lb

TECHNICAL INFORMATION

The scientific and technical information contained in this press release has been reviewed and approved by Steven Yopps, MMSA, Director - Metallurgy, North America; Craig Fiddes, North America Resource Modeling Manager; Chad Yuhasz, P.Geo, Mineral Resource Manager, Latin America and Australia Pacific; Simon Bottoms, CGeol, MGeol, FGS, MAusIMM, Mineral Resources Manager: Africa and Middle East; Rodney Quick, MSc, Pr. Sci.Nat, Mineral Resource Management and Evaluation Executive; John Steele, CIM, Metallurgy, Engineering and Capital Projects Executive; and Rob Krcmarov, FAusIMM, Executive Vice President, Exploration and Growth – each a “Qualified Person” as defined in National Instrument 43-101Standards of Disclosure for Mineral Projects.

All mineral reserve and mineral resource estimates are estimated in accordance with National Instrument 43-101Standards of Disclosure for Mineral Projects. Unless otherwise noted, such mineral reserve and mineral resource estimates are as of December 31, 2019.

Endnotes

Endnote 1

In this press release of unaudited financial results, “adjusted net earnings” and “adjusted net earnings per share” are non-GAAP financial performance measures. Adjusted net earnings excludes the following from net earnings: certain impairment charges (reversals) related to intangibles, goodwill, property, plant and equipment, and investments; gains (losses) and other one-time costs relating to acquisitions or dispositions; foreign currency translation gains (losses); significant tax adjustments not related to current period earnings; unrealized gains (losses) on non-hedge derivative instruments; and the tax effect and non-controlling interest of these items. The Company uses this measure internally to evaluate our underlying operating performance for the reporting periods presented and to assist with the planning and forecasting of future operating results. Barrick believes that adjusted net earnings is a useful measure of our performance because these adjusting items do not reflect the underlying operating performance of our core mining business and are not necessarily indicative of future operating results. Adjusted net earnings and adjusted net earnings per share are intended to provide additional information only and do not have any standardized meaning under IFRS and may not be comparable to similar measures of performance presented by other companies. They should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Further details on these non-GAAP measures are provided in the MD&A accompanying Barrick’s financial statements filed from time to time on SEDAR at www.sedar.com and on EDGAR at www.sec.gov.

 

BARRICK YEAR-END 2019    19    PRESS RELEASE


Reconciliation of Net Earnings to Net Earnings per Share, Adjusted Net Earnings and Adjusted Net Earnings per Share

(Unaudited)

 

  ($ millions, except per share amounts in dollars)    For the three months ended            For the years ended  
      12/31/19     9/30/19     12/31/19     12/31/18     12/31/17  

Net earnings (loss) attributable to equity holders of the Company

     1,387       2,277       3,969       (1,545     1,438  

Impairment charges (reversals) related to long-lived assetsa

     (566     (872     (1,423     900       (212

Acquisition/disposition (gains) lossesb

     (414     (1,901     (2,327     (68     (911

(Gain) loss on currency translation

     53       40       109       136       72  

Significant tax adjustmentsc

     74       35       34       742       244  

Other (income) expense adjustmentsd

     (845     53       (687     366       178  

Unrealized gains (losses) on non-hedge derivative instruments

     0       1       0       1       (1

Tax effect and non-controlling intereste

     611       631       1,227       (123     68  

Adjusted net earnings

     300       264       902       409       876  

Net earnings (loss) per sharef

     0.78       1.30       2.26       (1.32     1.23  

Adjusted net earnings per sharef

     0.17       0.15       0.51       0.35       0.75  

 

  a.

Net impairment reversals for the current year primarily relate to non-current asset reversals at Pueblo Viejo, partially offset by impairment charges at Pascua-Lama in the fourth quarter of 2019. This was further impacted by non-current asset reversals at Lumwana in the third quarter of 2019. Net impairment charges for 2018 primarily relate to non-current asset impairments at Lagunas Norte and non-current asset and goodwill impairments at Veladero.

  b.

Acquisition/disposition gains for the current year primarily relate to the gain on the sale of our 50% interest in Kalgoorlie in the fourth quarter of 2019 and the gain on the remeasurement of Turquoise Ridge to fair value as a result of its contribution to Nevada Gold Mines in the third quarter of 2019.

  c.

Significant tax adjustments in 2018 primarily relate to the de-recognition of our Canadian and Peruvian deferred tax assets.

  d.

Other expense adjustments for the current year primarily relate to the gain on the de-recognition of the deferred revenue liability relating to our silver sale agreement with Wheaton Precious Metals Corp. and the gain on a tax settlement at Lumwana, both occurring in the fourth quarter of 2019.

  e.

Tax effect and non-controlling interest for the current year primarily relates to the impairment charges related to long-lived assets.

  f.

Calculated using weighted average number of shares outstanding under the basic method of earnings per share.

Endnote 2

A Tier One Gold Asset is a mine with a stated life in excess of 10 years, annual production of at least 500,000 ounces of gold and total cash costs per ounce over the mine life that are in the lower half of the industry cost curve.

Endnote 3

Includes Tanzania on a 63.9% basis (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience), Pueblo Viejo on a 60% basis, South Arturo on a 60% basis (36.9% from July 1, 2019 onwards as a result of its contribution to Nevada Gold Mines), and Veladero on a 50% basis, which reflects our equity share of production and sales. Also includes Loulo-Gounkoto on an 80% basis, Kibali on a 45% basis, Tongon on an 89.7% basis and Morila on a 40% basis, which reflects our equity share of production and sales, commencing January 1, 2019, the effective date of the Merger. Also removes the non-controlling interest of 38.5% Nevada Gold Mines from July 1, 2019 onwards.

Endnote 4

“Realized price” is a non-GAAP financial measure which excludes from sales: unrealized gains and losses on non-hedge derivative contracts; unrealized mark-to-market gains and losses on provisional pricing from copper and gold sales contracts; sales attributable to ore purchase arrangements; treatment and refining charges; export duties; and cumulative catch-up adjustments to revenue relating to our streaming arrangements. This measure is intended to enable Management to better understand the price realized in each reporting period for gold and copper sales because unrealized mark-to-market values of non-hedge gold and copper derivatives are subject to change each period due to changes in market factors such as market and forward gold and copper prices, so that prices ultimately realized may differ from those recorded. The exclusion of such unrealized mark-to-market gains and losses from the presentation of this performance measure enables investors to understand performance based on the realized proceeds of selling gold and copper production. The realized price measure is intended to provide additional information and does not have any standardized definition under IFRS and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Further details on these non-GAAP measures are provided in the MD&A accompanying Barrick’s financial statements filed from time to time on SEDAR at www.sedar.com and on EDGAR at www.sec.gov.

 

BARRICK YEAR-END 2019    20    PRESS RELEASE


Reconciliation of Sales to Realized Price per ounce/pound

(Unaudited)

 

 ($ millions, except per ounce/

 pound information in dollars)

   Gold     Copper             Gold                      Copper  
             For the three months ended                                   For the years ended  
      12/31/19     9/30/19     12/31/19      9/30/19      12/31/19     12/31/18     12/31/17     12/31/19      12/31/18      12/31/17  

 Sales

     2,758       2,585       82        45        9,186       6,600       7,631       393        512        608  

 Sales applicable to non-controlling interests

     (769     (748     0        0        (1,981     (734     (810     0        0        0  

 Sales applicable to equity method investmentsa,b

     139       140       147        100        543       0       0       492        442        427  

 Realized non-hedge gold/copper  derivative

 (losses) gains

     0       0       0        0        1       2       3       0        0        0  

 Sales applicable to sites in care and maintenancec

     (56     (32     0        0        (140     (111     (153     0        0        0  

 Treatment and refinement charges

     0       0       25        18        0       1       1       99        144        157  

 Export duties

     0       0       0        0        0       (1     0       0        0        0  

 Otherd

     22       0       0        0        22       12       0       0        0        0  

 Revenues – as adjusted

     2,094       1,945       254        163        7,631       5,769       6,672       984        1,098        1,192  

 Ounces/pounds sold (000s ounces/

 millions pounds)c

     1,413       1,318       91        65        5,467       4,544       5,302       355        382        405  

 Realized gold/copper price per ounce/

 pounde

     1,483       1,476       2.76        2.55        1,396       1,270       1,258       2.77        2.88        2.95  

 

  a.

Represents sales of $130 million and $505 million, respectively, for the three months and year ended December 31, 2019 (September 30, 2019: $133 million; 2018: $nil; 2017: $nil) applicable to our 45% equity method investment in Kibali and $9 million and $39 million, respectively (September 30, 2019: $8 million; 2018: $nil; 2017: $nil) applicable to our 40% equity method investment in Morila for gold. Represents sales of $110 million and $343 million for the three months and year ended December 31, 2019 (September 30, 2019: $66 million; 2018: $300 million; 2017: $325 million) applicable to our 50% equity method investment in Zaldívar and $43 million and $168 million, respectively (September 30, 2019: $37 million; 2018: $161 million; 2017: $116 million) applicable to our 50% equity method investment in Jabal Sayid.

  b.

Sales applicable to equity method investments are net of treatment and refinement charges.

  c.

Figures exclude Pierina, Golden Sunlight and Morila starting in the third quarter of 2019, and Lagunas Norte starting in the fourth quarter of 2019 from the calculation of realized price per ounce, which are mining incidental ounces as they enter closure.

  d.

Represents cumulative catch-up adjustment to revenue relating to our streaming arrangements.

  e.

Realized price per ounce/pound may not calculate based on amounts presented in this table due to rounding.

Endnote 5

“Free cash flow” is a non-GAAP financial performance measure which deducts capital expenditures from net cash provided by operating activities. Barrick believes this to be a useful indicator of our ability to operate without reliance on additional borrowing or usage of existing cash. Free cash flow is intended to provide additional information only and does not have any standardized meaning under IFRS and may not be comparable to similar measures of performance presented by other companies. Free cash flow should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Further details on this non-GAAP measure are provided in the MD&A accompanying Barrick’s financial statements filed from time to time on SEDAR at www.sedar.com and on EDGAR at www.sec.gov.

Reconciliation of Net Cash Provided by Operating Activities to Free Cash Flow

(Unaudited)

 

    ($ millions)    For the three months ended            For the years ended  
      12/31/19     9/30/19     12/31/19     12/31/18     12/31/17  

Net cash provided by operating activities

     875       1,004       2,833       1,765       2,065  

Capital expenditures

     (446     (502     (1,701     (1,400     (1,396

Free cash flow

     429       502       1,132       365       669  

Endnote 6

These amounts are presented on the same basis as our guidance and include our 60% share of Pueblo Viejo and South Arturo (36.9% of South Arturo from July 1, 2019 onwards as a result of its contribution to Nevada Gold Mines), our 63.9% share of Tanzania until September 30, 2019 (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience) and our 50% share of Zaldívar and Jabal Sayid. Also includes our 80% share of Loulo-Gounkoto, 89.7% share of Tongon, 45% share of Kibali and 40% share of Morila commencing January 1, 2019, the effective date of the Merger. Starting July 1, 2019, it also includes our 61.5% share of Nevada Gold Mines.

 

BARRICK YEAR-END 2019    21    PRESS RELEASE


Endnote 7

Cost of sales applicable to gold per ounce is calculated using cost of sales applicable to gold on an attributable basis (removing the non-controlling interest of 40% Pueblo Viejo, 36.1% Tanzania until September 30, 2019 (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience) and 40% South Arturo from cost of sales (63.1% of South Arturo from July 1, 2019 onwards as a result of its contribution to Nevada Gold Mines)), divided by attributable gold ounces. The non-controlling interest of 20% Loulo-Gounkoto and 10.3% of Tongon is also removed from cost of sales and our proportionate share of cost of sales attributable to equity method investments (Kibali and Morila) is included commencing January 1, 2019, the effective date of the Merger. Also removes the non-controlling interest of 38.5% Nevada Gold Mines from cost of sales from July 1, 2019 onwards. Cost of sales applicable to copper per pound is calculated using cost of sales applicable to copper including our proportionate share of cost of sales attributable to equity method investments (Zaldívar and Jabal Sayid), divided by consolidated copper pounds (including our proportionate share of copper pounds from our equity method investments).

Endnote 8

“Total cash costs” per ounce, “All-in sustaining costs” per ounce and “All-in costs” per ounce are non-GAAP financial performance measures. “Total cash costs” per ounce starts with cost of sales related to gold production but removes depreciation, the non-controlling interest of cost of sales, and includes by-product credits. “All-in sustaining costs” per ounce begin with “Total cash costs” per ounce and add further costs which reflect the expenditures made to maintain current production levels, primarily sustaining capital expenditures, sustaining leases, general & administrative costs, minesite exploration and evaluation costs, and reclamation cost accretion and amortization. “All-in costs” per ounce starts with “All-in sustaining costs” per ounce and adds additional costs that reflect the varying costs of producing gold over the life-cycle of a mine, including: project capital expenditures and other non-sustaining costs. Barrick believes that the use of “total cash costs” per ounce, “all-in sustaining costs” per ounce and “All-in costs” per ounce will assist investors, analysts and other stakeholders in understanding the costs associated with producing gold, understanding the economics of gold mining, assessing our operating performance and also our ability to generate free cash flow from current operations and to generate free cash flow on an overall Company basis. “Total cash costs” per ounce, “All-in sustaining costs” per ounce and “All-in costs” per ounce are intended to provide additional information only and do not have any standardized meaning under IFRS. Although a standardized definition of all-in sustaining costs was published in 2013 by the World Gold Council (a market development organization for the gold industry comprised of and funded by 25 gold mining companies from around the world, including Barrick), it is not a regulatory organization, and other companies may calculate this measure differently. Starting from the first quarter of 2019, we have renamed “cash costs” to “total cash costs” when referring to our gold operations. The calculation of total cash costs is identical to our previous calculation of cash costs with only a change in the naming convention of this non-GAAP measure. These measures should not be considered in isolation or as a substitute for measures prepared in accordance with IFRS. Further details on these non-GAAP measures are provided in the MD&A accompanying Barrick’s financial statements filed from time to time on SEDAR at www.sedar.com and on EDGAR at www.sec.gov.

 

BARRICK YEAR-END 2019    22    PRESS RELEASE


Reconciliation of Gold Cost of Sales to Total cash costs, All-in sustaining costs and All-in costs, including on a per ounce basis

(Unaudited)

 

  ($ millions, except per ounce information in dollars)          For the three months ended            For the years ended  
      Footnote    12/31/19     9/30/19           12/31/19           12/31/18           12/31/17  

Cost of sales applicable to gold production

        1,896       1,831       6,514       4,621       4,836  

Depreciation

        (549     (538     (1,902     (1,253     (1,529

Cash cost of sales applicable to equity method investments

        57       45       226       0       0  

By-product credits

        (43     (48     (138     (131     (135

Realized (gains) losses on hedge and non-hedge derivatives

   a      1       1       1       3       23  

Non-recurring items

   b      (22     (4     (55     (172     0  

Other

   c      (37     (19     (102     (87     (106

Non-controlling interests

   d      (326     (339     (878     (313     (299

Total cash costs

          977       929       3,666       2,668       2,790  

General & administrative costs

        31       68       212       265       248  

Minesite exploration and evaluation costs

   e      24       22       69       45       47  

Minesite sustaining capital expenditures

   f      394       406       1,320       975       1,109  

Sustaining leases

        4       5       27       0       0  

Rehabilitation - accretion and amortization (operating sites)

   g      7       28       65       81       64  

Non-controlling interest, copper operations and other

   h      (135     (184     (470     (374     (273

All-in sustaining costs

          1,302       1,274       4,889       3,660       3,985  

Project exploration and evaluation and project costs

   e      60       64       273       338       307  

Community relations costs not related to current operations

        0       1       2       4       4  

Project capital expenditures

   f      46       96       370       459       273  

Rehabilitation - accretion and amortization (non-operating sites)

   g      3       5       22       33       20  

Non-controlling interest and copper operations and other

   h      (28     (46     (105     (21     (21

All-in costs

          1,383       1,394       5,451       4,473       4,568  

Ounces sold - equity basis (000s ounces)

   i      1,413       1,318       5,467       4,544       5,302  

Cost of sales per ounce

   j,k      1,046       1,065       1,005       892       794  

Total cash costs per ounce

   k      692       710       671       588       526  

Total cash costs per ounce (on a co-product basis)

   k,l      712       735       689       607       544  

All-in sustaining costs per ounce

   k      923       984       894       806       750  

All-in sustaining costs per ounce (on a co-product basis)

   k,l      943       1,009       912       825       768  

All-in costs per ounce

   k      976       1,074       996       985       860  

All-in costs per ounce (on a co-product basis)

   k,l      996       1,099       1,014       1,004       878  

 

  a.

Realized (gains) losses on hedge and non-hedge derivatives

Includes realized hedge losses of $nil and $nil for the three months and year ended December 31, 2019, respectively (September 30, 2019: $nil; 2018: $4 million; 2017: $27 million), and realized non-hedge losses of $1 million and $1 million for the three months and year ended December 31, 2019, respectively (September 30, 2019: $1 million; 2018: gains of $1 million; 2017: gains of $4 million).

 

  b.

Non-recurring items

Non-recurring items in 2019 relate to organizational restructuring. These costs are not indicative of our cost of production and have been excluded from the calculation of total cash costs.

 

  c.

Other

Other adjustments for the three months and year ended December 31, 2019 include the removal of total cash costs and by-product credits associated with our Pierina mine, Golden Sunlight and Morila starting in the third quarter of 2019, and Lagunas Norte starting in the fourth quarter of 2019, which all are mining incidental ounces as they enter closure, of $35 million and $92 million, respectively (September 30, 2019: $19 million; 2018: $87 million; 2017: $108 million).

 

BARRICK YEAR-END 2019    23    PRESS RELEASE


  d.

Non-controlling interests

Non-controlling interests include non-controlling interests related to gold production of $477 million and $1,306 million, respectively, for the three months and year ended December 31, 2019 (September 30, 2019: $506 million; 2018: $453 million; 2017: $454 million). Non-controlling interests include Pueblo Viejo and Tanzania until September 30, 2019 (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience). Starting January 1, 2019, the effective date of the Merger, non-controlling interests also include Loulo-Gounkoto and Tongon and starting July 1, 2019, it also includes Nevada Gold Mines.

 

  e.

Exploration and evaluation costs

Exploration, evaluation and project expenses are presented as minesite if it supports current mine operations and project if it relates to future projects. Refer to page 84 of the Fourth Quarter 2019 MD&A.

 

  f.

Capital expenditures

Capital expenditures are related to our gold sites only and are presented on a 100% cash basis starting from January 1, 2019 and on a 100% accrued basis for 2018 and 2017. They are split between minesite sustaining and project capital expenditures. Project capital expenditures are distinct projects designed to increase the net present value of the mine and are not related to current production. Significant projects in the current year are stripping at Rangefront declines, Cortez Crossroads, the Goldrush exploration declines, the Deep South Expansion, and construction of the third shaft at Turquoise Ridge. Refer to page 83 of the Fourth Quarter 2019 MD&A.

 

  g.

Rehabilitation - accretion and amortization

Includes depreciation on the assets related to rehabilitation provisions of our gold operations and accretion on the rehabilitation provisions of our gold operations, split between operating and non-operating sites.

 

  h.

Non-controlling interest and copper operations

Removes general & administrative costs related to non-controlling interests and copper based on a percentage allocation of revenue. Also removes exploration, evaluation and project expenses, rehabilitation costs and capital expenditures incurred by our copper sites and the non-controlling interest of our Tanzania operations until September 30, 2019 (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience) and Pueblo Viejo and South Arturo (63.1% of South Arturo from July 1, 2019 onwards as a result of its contribution to Nevada Gold Mines). Also removes the non-controlling interest of our Loulo-Gounkoto and Tongon operating segments commencing January 1, 2019, the effective date of the Merger, and of Nevada Gold Mines starting July 1, 2019. It also includes capital expenditures applicable to equity method investments. Figures remove the impact of Pierina, Golden Sunlight and Morila starting in the third quarter of 2019, and Lagunas Norte starting in the fourth quarter of 2019. The impact is summarized as the following:

 

   ($ millions)    For the three months ended            For the years ended  
   Non-controlling interest, copper operations and other    12/31/19     9/30/19     12/31/19     12/31/18     12/31/17  

General & administrative costs

     (3     (22     (58     (104     (21

Minesite exploration and evaluation costs

     (6     (9     (16     (3     (12

Rehabilitation - accretion and amortization (operating sites)

     (1     (10     (13     (6     (10

Minesite sustaining capital expenditures

     (125     (143     (383     (261     (230

All-in sustaining costs total

     (135     (184     (470     (374     (273

Project exploration and evaluation and project costs

     (14     (12     (54     (16     (17

Project capital expenditures

     (14     (34     (51     (5     (4

All-in costs total

     (28     (46     (105     (21     (21

 

  i.

Ounces sold - equity basis

Figures remove the impact of Pierina, Golden Sunlight and Morila starting in the third quarter of 2019, and Lagunas Norte starting in the fourth quarter of 2019, which are mining incidental ounces as the sites enter closure.

 

  j.

Cost of sales per ounce

Figures remove the cost of sales impact of Pierina of $14 million and $113 million, respectively, for the three months and year ended December 31, 2019 (September 30, 2019: $28 million; 2018: $116 million; 2017: $174 million); starting in the third quarter of 2019, Golden Sunlight of $nil and $1 million, respectively, for the three months and year ended December 31, 2019 (September 30, 2019: $1 million; 2018: $nil; 2017: $nil) and Morila of $13 million and $23 million, respectively, for the three months and year ended December 31, 2019 (September 30, 2019: $10 million; 2018: $nil; 2017: $nil); and starting in the fourth quarter of 2019, Lagunas Norte of $26 million and $26 million, respectively, for the three months and year ended December 31, 2019 (September 30, 2019: $nil; 2018: $nil; 2017: $nil), which are mining incidental ounces as these sites enter closure. Cost of sales per ounce excludes non-controlling interest related to gold production. Cost of sales applicable to gold per ounce is calculated using cost of sales on an attributable basis (removing the non-controlling interest of 40% Pueblo Viejo, 36.1% Tanzania until September 30, 2019 (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience) and 40% South Arturo from cost of sales (63.1% of South Arturo from July 1, 2019 onwards as a result of its contribution to Nevada Gold Mines)), divided by attributable gold ounces. The non-controlling interest of 20% Loulo-Gounkoto and 10.3% of Tongon is also removed from cost of sales and our proportionate share of cost of sales attributable to equity method investments (Kibali and Morila) is included commencing January 1, 2019, the effective date of the Merger. Also removes the non-controlling interest of 38.5% Nevada Gold Mines from cost of sales from July 1, 2019 onwards.

 

  k.

Per ounce figures

Cost of sales per ounce, cash costs per ounce, all-in sustaining costs per ounce and all-in costs per ounce may not calculate based on amounts presented in this table due to rounding.

 

  l.

Co-product costs per ounce

Cash costs per ounce, all-in sustaining costs per ounce and all-in costs per ounce presented on a co-product basis remove the impact of by-product credits of our gold production (net of non-controlling interest) calculated as:

 

   ($ millions)    For the three months ended            For the years ended  
      12/31/19     9/30/19     12/31/19     12/31/18     12/31/17  

By-product credits

     43       48       138       131       135  

Non-controlling interest

     (17     (16     (48     (45     (30

By-product credits (net of non-controlling interest)

     26       32       90       86       105  

 

BARRICK YEAR-END 2019    24    PRESS RELEASE


Endnote 9

“C1 cash costs” per pound and “All-in sustaining costs” per pound are non-GAAP financial performance measures. “C1 cash costs” per pound is based on cost of sales but excludes the impact of depreciation and royalties and production taxes and includes treatment and refinement charges. “All-in sustaining costs” per pound begins with “C1 cash costs” per pound and adds further costs which reflect the additional costs of operating a mine, primarily sustaining capital expenditures, general & administrative costs and royalties and production taxes. Barrick believes that the use of “C1 cash costs” per pound and “all-in sustaining costs” per pound will assist investors, analysts, and other stakeholders in understanding the costs associated with producing copper, understanding the economics of copper mining, assessing our operating performance, and also our ability to generate free cash flow from current operations and to generate free cash flow on an overall Company basis. “C1 cash costs” per pound and “All-in sustaining costs” per pound are intended to provide additional information only, do not have any standardized meaning under IFRS, and may not be comparable to similar measures of performance presented by other companies. These measures should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Further details on these non-GAAP measures are provided in the MD&A accompanying Barrick’s financial statements filed from time to time on SEDAR at www.sedar.com and on EDGAR at www.sec.gov.

Reconciliation of Copper Cost of Sales to C1 cash costs and All-in sustaining costs, including on a per pound basis

(Unaudited)

 

   ($ millions, except per pound information in dollars)    For the three months ended            For the years ended  
      12/31/19     9/30/19     12/31/19     12/31/18     12/31/17  

Cost of sales

     80       49       361       558       399  

Depreciation/amortization

     (17     (13     (100     (170     (83

Treatment and refinement charges

     25       18       99       144       157  

Cash cost of sales applicable to equity method investments

     94       59       288       281       245  

Less: royalties and production taxesa

     (9     (5     (35     (44     (38

By-product credits

     (1     (3     (9     (6     (5

Other

     0       0       (5     (11     0  

C1 cash cost of sales

     172       105       599       752       675  

General & administrative costs

     3       5       19       28       12  

Rehabilitation - accretion and amortization

     7       2       15       16       12  

Royalties and production taxes

     9       5       35       44       38  

Minesite exploration and evaluation costs

     2       1       6       4       6  

Minesite sustaining capital expenditures

     60       48       215       220       204  

Sustaining leases

     3       0       5       0       0  

Inventory write-downs

     0       0       0       11       0  

All-in sustaining costs

     256       166       894       1,075       947  

Pounds sold - consolidated basis (millions pounds)

     91       65       355       382       405  

Cost of sales per poundb,c

     2.26       2.00       2.14       2.40       1.77  

C1 cash cost per poundb

     1.90       1.62       1.69       1.97       1.66  

All-in sustaining costs per poundb

     2.82       2.58       2.52       2.82       2.34  
  a.

For the three months and year ended December 31, 2019, royalties and production taxes include royalties of $8 million and $34 million, respectively (September 30, 2019: $5 million, 2018: $39 million and 2017: $38 million ).

  b.

Cost of sales per pound, C1 cash costs per pound and all-in sustaining costs per pound may not calculate based on amounts presented in this table due to rounding.

  c.

Cost of sales per pound related to copper is calculated using cost of sales including our proportionate share of cost of sales attributable to equity method investments (Zaldívar and Jabal Sayid), divided by consolidated copper pounds sold (including our proportionate share of copper pounds sold from our equity method investments).

Endnote 10

The declaration and payment of dividends is at the discretion of the Board of Directors, and will depend on the Company’s financial results, cash requirements, prospects, and other factors deemed relevant by the Board.

Endnote 11

Estimated in accordance with National Instrument 43-101 as required by Canadian securities regulatory authorities. Estimates are as of December 31, 2019. Fourmile inferred resources were 5.4 million tonnes at 10.9 g/t for 1.9 million ounces of gold as at December 31, 2019 compared to 1.2 million ounces at 18.6 g/t for 700,000 ounces of gold as at December 31, 2018. Complete mineral reserve and resource data, including tonnes, grades, and ounces, as well as the assumptions on which the mineral reserves for Barrick are reported, are set out in Barrick’s Q4 2019 Report issued on February 12, 2020.

 

BARRICK YEAR-END 2019    25    PRESS RELEASE


Endnote 12

Estimated in accordance with National Instrument 43-101 as required by Canadian securities regulatory authorities. Estimates are as of December 31, 2019, unless otherwise noted. Proven reserves of 280 million tonnes grading 2.42 g/t, representing 22 million ounces of gold; 420 million tonnes grading 0.4%, representing 3,700 million pounds of copper; and 150 million tonnes grading 4.31 g/t, representing 21 million ounces of silver. Probable reserves of 1,000 million tonnes grading 1.48 g/t, representing 49 million ounces of gold; 1,200 million tonnes grading 0.38%, representing 9,800 million pounds of copper; and 750 million tonnes grading 5.18 g/t, representing 120 million ounces of silver. Measured resources of 530 million tonnes grading 2.21 g/t, representing 37 million ounces of gold; 660 million tonnes grading 0.38%, representing 5,500 million pounds of copper; and 350 million tonnes grading 12.52 g/t, representing 140 million ounces of silver. Indicated resources of 2,800 million tonnes grading 1.43 g/t, representing 130 million ounces of gold; 2,400 million tonnes grading 0.38%, representing 21,000 million pounds of copper; and 2,000 million tonnes grading 13.44 g/t, representing 870 million ounces of silver. Inferred resources of 940 million tonnes grading 1.3 g/t, representing 39 million ounces of gold; 430 million tonnes grading 0.2%, representing 2,200 million pounds of copper; and 460 million tonnes grading 3.20 g/t, representing 47 million ounces of silver. Complete mineral reserve and resource data, including tonnes, grades, and ounces, as well as the assumptions on which the mineral reserves for Barrick are reported (on an attributable basis), are set out in Barrick’s Q4 2019 Report issued on February 12, 2020.

Estimates as of December 31, 2018, unless otherwise noted are proven reserves of 344.6 million tonnes grading 2.15 g/t, representing 23.9 million ounces of gold, and 169.2 million tonnes grading 0.59%, representing 2.195 billion pounds of copper. Probable reserves of 0.9 billion tonnes grading 1.33 g/t, representing 38.4 million ounces of gold, and 452.7 million tonnes grading 0.55%, representing 5.454 billion pounds of copper. Complete 2018 mineral reserve and resource data, including tonnes, grades, and ounces, can be found on pages 33-45 of Barrick’s Annual Information Form/Form 40-F for the year ended December 31, 2018 on file with Canadian provincial securities regulatory authorities and the U.S. Securities and Exchange Commission.

Endnote 13

For additional detail regarding Pueblo Viejo, see the Technical Report on the Pueblo Viejo mine, Sanchez Ramirez Province, Dominican Republic, dated March 19, 2018, and filed on SEDAR at www.sedar.com and EDGAR at www.sec.gov on March 23, 2018.

Endnote 14

Estimated in accordance with National Instrument 43-101 as required by Canadian securities regulatory authorities. Estimates for Pueblo Viejo are as of December 31, 2019 (100% basis). Proven reserves of 16.83 million tonnes grading 2.68 g/t, representing 1.45 million ounces of gold. Probable reserves of 102.29 million tonnes grading 2.46 g/t, representing 8.08 million ounces of gold. Measured resources of 133.46 million tonnes grading 2.41 g/t, representing 10.35 million ounces of gold. Indicated resources of 206.77 million tonnes grading 2.25 g/t, representing 14.96 million ounces of gold. Inferred resources of 54.27 million tonnes grading 2.10 g/t, representing 3.67 million ounces of gold. Complete mineral reserve and resource data, including tonnes, grades, and ounces, as well as the assumptions on which the mineral reserves for Barrick are reported (on an attributable basis), are set out in Barrick’s Q4 2019 Report issued on February 12, 2020.

Endnote 15

On a 100% basis. Our 2019 attributable gold production forecast (45%) was 330 - 350 thousand ounces for Kibali.

Endnote 16

On a 100% basis. Our 2019 attributable production forecast (80%) was 520 - 570 thousand ounces for Loulo-Gounkoto.

Endnote 17

These five operations are part of Nevada Gold Mines from July 1, 2019. Amounts include Cortez (100%), Goldstrike (100%) and Turquoise Ridge (75%), also known collectively as Barrick Nevada, from January 1, 2019 to June 30, 2019, and Cortez, Carlin (which includes Goldstrike), Turquoise Ridge (including Twin Creeks), Phoenix and Long Canyon on a 61.5% basis from July 1, 2019 onwards as a result of the formation of Nevada Gold Mines with Newmont on July 1, 2019.

Endnote 18

Includes our 60% share of South Arturo from January 1, 2019 to June 30, 2019 and 36.9% from July 1, 2019 onwards as a result of the formation of Nevada Gold Mines with Newmont on July 1, 2019.

Endnote 19

Formerly known as Acacia Mining plc. On September 17, 2019, Barrick acquired all of the shares of Acacia it did not own. Operating results are included at 100% from October 1, 2019 (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience) up until the GoT’s 16% free-carried interest is made effective, which is expected to be January 1, 2020, and on an 84% basis thereafter. As the GoT’s 16% free-carried interest is expected to be made effective in January 2020, our 2020 outlook represents our 84% share.

 

BARRICK YEAR-END 2019    26    PRESS RELEASE


Endnote 20

Also includes Lagunas Norte, Golden Sunlight, and Morila (40%) and excludes Pierina which is mining incidental ounces as it enters closure. Due to the planned ramp down of operations, we have ceased to include production or non-GAAP cost metrics for Golden Sunlight or Morila after the second quarter and Lagunas Norte after the third quarter.

Endnote 21

Total cash costs and all-in sustaining costs per ounce include costs allocated to non-operating sites.

Endnote 22

Operating division guidance ranges reflect expectations at each individual operating division, and may not add up to the company-wide guidance range total. The company-wide 2019 results and guidance ranges exclude Pierina, which is mining incidental ounces as it enters closure, and Golden Sunlight and Morila after the second quarter of 2019 and Lagunas Norte after the third quarter of 2019 due to the planned ramp down of operations.

Endnote 23

Includes corporate administration costs.

Endnote 24

Attributable capital expenditures are presented on the same basis as guidance, which includes our 61.5% share of Nevada Gold Mines, our 60% share of Pueblo Viejo, our 80% share of Loulo-Gounkoto, our 89.7% share of Tongon, our 84% share of North Mara, Bulyanhulu and Buzwagi and our 50% share of Zaldívar and Jabal Sayid. As the GoT’s 16% free-carried interest is expected to be made effective as of January 1, 2020, our 2020 outlook represents our 84% share of North Mara, Bulyanhulu and Buzwagi.

Endnote 25

EBITDA is a non-GAAP financial measure, which excludes the following from net earnings: income tax expense; finance costs; finance income; and depreciation. Management believes that EBITDA is a valuable indicator of our ability to generate liquidity by producing operating cash flow to fund working capital needs, service debt obligations, and fund capital expenditures. Management uses EBITDA for this purpose. Adjusted EBITDA removes the effect of impairment charges; acquisition/disposition gains/losses; foreign currency translation gains/losses; other expense adjustments; unrealized gains on non-hedge derivative instruments; and the impact of the income tax expense, finance costs, finance income and depreciation incurred in our equity method accounted investments. We believe these items provide a greater level of consistency with the adjusting items included in our Adjusted Net Earnings reconciliation, with the exception that these amounts are adjusted to remove any impact on finance costs/income, income tax expense and/or depreciation as they do not affect EBITDA. We believe this additional information will assist analysts, investors and other stakeholders of Barrick in better understanding our ability to generate liquidity from our full business, including equity method investments, by excluding these amounts from the calculation as they are not indicative of the performance of our core mining business and not necessarily reflective of the underlying operating results for the periods presented. EBITDA and adjusted EBITDA are intended to provide additional information only and do not have any standardized meaning under IFRS and may not be comparable to similar measures of performance presented by other companies. They should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Further details on these non-GAAP measures are provided in the MD&A accompanying Barrick’s financial statements filed from time to time on SEDAR at www.sedar.com and on EDGAR at www.sec.gov.

 

BARRICK YEAR-END 2019    27    PRESS RELEASE


Reconciliation of Net Earnings to EBITDA and Adjusted EBITDA

(Unaudited)

 

($ millions)

       For the three months ended                     For the years ended  
         12/31/19          9/30/19          12/31/19          12/31/18          12/31/17  

Net earnings (loss)

       1,776          2,435          4,574          (1,435)          1,516  

Income tax expense

       784          791          1,783          1,198          1,231  

Finance costs, neta

       90          106          394          458          624  

Depreciation

       572          559          2,032          1,457          1,647  

EBITDA

       3,222          3,891          8,783          1,678          5,018  

Impairment charges (reversals) of long-lived assetsb

       (566)          (872)          (1,423)          900          (212)  

Acquisition/disposition (gains)/lossesc

       (414)          (1,901)          (2,327)          (68)          (911)  

Foreign currency translation (gains)/losses

       53          40          109          136          72  

Other (income) expense adjustmentsd

       (845)          53          (687)          336          51  

Unrealized gains on non-hedge derivative instruments

       0          1          0          1          (1)  
Income tax expense, net finance costsa, and
depreciation from equity investees
       112          85          378          97          98  

Adjusted EBITDA

       1,562          1,297          4,833          3,080          4,115  

 

  a.

Finance costs exclude accretion.

  b.

Net impairment reversals for the current year primarily relate to non-current asset reversals at Pueblo Viejo, partially offset by impairment charges at Pascua-Lama in the fourth quarter of 2019. This was further impacted by non-current asset reversals at Lumwana in the third quarter of 2019. Net impairment charges for 2018 primarily relate to non-current asset impairments at Lagunas Norte and non-current asset and goodwill impairments at Veladero.

  c.

Acquisition/disposition gains for the current year primarily relate to the gain on the sale of our 50% interest in Kalgoorlie in the fourth quarter of 2019 and the gain on the remeasurement of Turquoise Ridge to fair value as a result of its contribution to Nevada Gold Mines in the third quarter of 2019.

  d.

Other expense adjustments for the current year primarily relate to the gain on the de-recognition of the deferred revenue liability relating to our silver sale agreement with Wheaton Precious Metals Corp. and the gain on a tax settlement at Lumwana, both occurring in the fourth quarter of 2019.

 

BARRICK YEAR-END 2019    28    PRESS RELEASE


MANAGEMENT’S DISCUSSION AND ANALYSIS (“MD&A”)

 

Management’s Discussion and Analysis (“MD&A”) is intended to help the reader understand Barrick Gold Corporation (“Barrick”, “we”, “our” or the “Company”), our operations, financial performance and the present and future business environment. This MD&A has been prepared as of February 12, 2020 for the year ended December 31, 2019. Unless otherwise indicated, all amounts are presented in US dollars.

For the purposes of preparing our MD&A, we consider the materiality of information. Information is considered material if: (i) such information results in, or would reasonably be expected to result in, a significant change in the market price or value of our shares; (ii) there is a substantial likelihood that a reasonable investor would consider it important in making

an investment decision; or (iii) it would significantly alter the total mix of information available to investors. We evaluate materiality with reference to all relevant circumstances, including potential market sensitivity.

Continuous disclosure materials, including our most recent Form 40-F/Annual Information Form, annual MD&A, audited consolidated financial statements, and Notice of Annual Meeting of Shareholders and Proxy Circular will be available on our website at www.barrick.com, on SEDAR at www.sedar.com and on EDGAR at www.sec.gov. For an explanation of terminology unique to the mining industry, readers should refer to the glossary on page 118.

 

 

CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION

 

Barrick cautions that, whether or not expressly stated, all full year and fourth quarter figures contained in this MD&A reflect our expected full year and fourth quarter results as of the date of this MD&A. Actual audited full year and fourth quarter results are subject to management’s final review, as well as review by the Company’s independent accounting firm, and may vary significantly from those expectations because of a number of factors, including, without limitation, additional or revised information, and changes in accounting standards or policies, or in how those standards are applied. For a complete picture of the Company’s financial performance, it will be necessary to review all of the information in the Company’s full year and fourth quarter financial report and related MD&A as filed on SEDAR at www.sedar.com and on EDGAR at www.sec.gov. Accordingly, readers are cautioned not to rely solely on the information contained herein.

Certain information contained or incorporated by reference in this MD&A, including any information as to our strategy, projects, plans or future financial or operating performance, constitutes “forward-looking statements”. All statements, other than statements of historical fact, are forward-looking statements. The words “believe”, “expect”, “anticipate”, “target”, “plan”, “objective”, “assume”, “intend”, “intention”, “project”, “goal”, “continue”, “budget”, “estimate”, “potential”, “may”, “will”, “can”, “could”, “would” and similar expressions identify forward-looking statements. In particular, this MD&A contains forward-looking statements including, without limitation, with respect to: Barrick’s goal to be the world’s most valued gold mining business; Barrick’s forward-looking production guidance and estimates of future costs ; cash flow forecasts; projected capital, operating and exploration expenditures; targeted debt and cost reductions; mine life and production rates; potential mineralization and metal or mineral recoveries; our ability to identify, invest in and develop potential Tier One, Tier Two and Strategic Assets; our strategies and plans with respect to environmental matters, including climate change; our future plans, growth potential, financial strength, investments and overall strategy; our plans and expected completion and benefits of our growth projects, including construction of twin exploration declines at Goldrush, the Turquoise Ridge Third Shaft, Pueblo Viejo plant expansion, Zaldívar chloride leach project, and Veladero

power transmission project; our ability to convert resources into reserves; asset sales, joint ventures and partnerships, including expected closing of the sale of our interest in Massawa; expectations regarding future price assumptions, financial performance and other outlook or guidance.

Forward-looking statements are necessarily based upon a number of estimates and assumptions including material estimates and assumptions related to the factors set forth below that, while considered reasonable by the Company as at the date of this MD&A in light of management’s experience and perception of current conditions and expected developments, are inherently subject to significant business, economic and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking statements and undue reliance should not be placed on such statements and information. Such factors include, but are not limited to: fluctuations in the spot and forward price of gold, copper or certain other commodities (such as silver, diesel fuel, natural gas and electricity); the speculative nature of mineral exploration and development; changes in mineral production performance, exploitation and exploration successes; risks associated with projects in the early stages of evaluation and for which additional engineering and other analysis is required; the Company’s ability to successfully re-integrate Acacia’s operations; whether benefits expected from recent transactions are realized; disruption of supply routes which may cause delays in construction and mining activities at Barrick’s more remote properties; diminishing quantities or grades of reserves; increased costs, delays, suspensions and technical challenges associated with the construction of capital projects; operating or technical difficulties in connection with mining or development activities, including geotechnical challenges and disruptions in the maintenance or provision of required infrastructure and information technology systems; failure to comply with environmental and health and safety laws and regulations; timing of receipt of, or failure to comply with, necessary permits and approvals; uncertainty whether some or targeted investments and projects will meet the Company’s capital allocation objectives and internal hurdle rate; the impact of global liquidity and credit availability on the timing of cash flows and the values of assets and liabilities based on projected future cash flows; adverse changes in our credit ratings; the impact of inflation;

 

 

BARRICK YEAR-END 2019   29   MANAGEMENT’S DISCUSSION AND ANALYSIS


fluctuations in the currency markets; changes in U.S. dollar interest rates; risks arising from holding derivative instruments; changes in national and local government legislation, taxation, controls or regulations and/or changes in the administration of laws, policies and practices; expropriation or nationalization of property and political or economic developments in Canada, the United States and other jurisdictions in which the Company or its affiliates do or may carry on business in the future; lack of certainty with respect to foreign legal systems, corruption and other factors that are inconsistent with the rule of law; risks associated with illegal and artisanal mining; the risks of operating in jurisdictions where infectious diseases present major health care issues; damage to the Company’s reputation due to the actual or perceived occurrence of any number of events, including negative publicity with respect to the Company’s handling of environmental matters or dealings with community groups, whether true or not; the possibility that future exploration results will not be consistent with the Company’s expectations; risks that exploration data may be incomplete and considerable additional work may be required to complete further evaluation, including but not limited to drilling, engineering and socioeconomic studies and investment; risk of loss due to acts of war, terrorism, sabotage and civil disturbances; litigation; contests over title to properties, particularly title to undeveloped properties, or over access to water, power and other required infrastructure; business opportunities that may be presented to, or pursued by, the Company; risks associated with the fact that certain of the initiatives described in this MD&A are still in the early stages and may not materialize; our ability to successfully integrate acquisitions or complete divestitures; risks associated with

working with partners in jointly controlled assets; employee relations including loss of key employees; increased costs and physical risks, including extreme weather events and resource shortages, related to climate change; and availability and increased costs associated with mining inputs and labor. In addition, there are risks and hazards associated with the business of mineral exploration, development and mining, including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins, flooding and gold bullion, copper cathode or gold or copper concentrate losses (and the risk of inadequate insurance, or inability to obtain insurance, to cover these risks).

Many of these uncertainties and contingencies can affect our actual results and could cause actual results to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf of, us. Readers are cautioned that forward-looking statements are not guarantees of future performance. All of the forward-looking statements made in this MD&A are qualified by these cautionary statements. Specific reference is made to the most recent Form 40-F/Annual Information Form on file with the SEC and Canadian provincial securities regulatory authorities for a more detailed discussion of some of the factors underlying forward-looking statements and the risks that may affect Barrick’s ability to achieve the expectations set forth in the forward-looking statements contained in this MD&A. We disclaim any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by applicable law.

 

 

MERGER WITH RANDGOLD RESOURCES LIMITED

On January 1, 2019, Barrick acquired 100% of the issued and outstanding shares of Randgold Resources Limited (“Randgold”) for $7.9 billion based on the December 31, 2018 closing share price of Barrick’s common shares (the “Merger”). We began consolidating the operating results, cash flows and net assets of Randgold from January 1, 2019 and the results presented in this MD&A reflect that.

USE OF NON-GAAP FINANCIAL PERFORMANCE MEASURES

We use the following non-GAAP financial performance measures in our MD&A:

    “adjusted net earnings”
    “free cash flow”
    “EBITDA”
    “adjusted EBITDA”
    “total cash costs per ounce”
    “C1 cash costs per pound”
    “all-in sustaining costs per ounce/pound”
    “all-in costs per ounce” and
    “realized price”

For a detailed description of each of the non-GAAP measures used in this MD&A and a detailed reconciliation to the most directly comparable measure under International Financial Reporting Standards (“IFRS”), please refer to the Non-GAAP Financial Performance Measures section of this MD&A on pages 91 to 112. Each non-GAAP financial performance measure has been annotated with a reference to an endnote on page 113. The non-GAAP financial performance measures

set out in this MD&A are intended to provide additional information to investors and do not have any standardized meaning under IFRS, and therefore may not be comparable to other issuers, and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.

Changes in Presentation of Non-GAAP Financial Performance Measures

Realized Price

Starting with this MD&A, we began adjusting for the cumulative catch-up adjustment to revenue relating to our streaming arrangements in our calculation of realized price. The prior periods have been restated to reflect this change. We believe that this additional information will assist analysts, investors and other stakeholders of Barrick to better understand our ability to generate revenue by excluding non-cash amounts from the calculation as they are not necessarily reflective of the underlying operating results for the periods presented.

Total cash costs

Starting from the first quarter of 2019, we have renamed “cash costs” to “total cash costs” when referring to our gold operations. The calculation of total cash costs is identical to our previous calculation of cash costs with only a change in the naming convention of this non-GAAP measure.

 

 

BARRICK YEAR-END 2019   30   MANAGEMENT’S DISCUSSION AND ANALYSIS


All-in sustaining costs and all-in costs

Starting from the first quarter of 2019, we have included sustaining capital expenditures and project capital expenditures on a cash basis instead of an accrual basis. As a result of adopting IFRS 16 Leases, the full lease amount is included in accrued capital expenditures on initial recognition. We believe that the change in capital expenditures from an accrual basis to a cash basis better reflects the timing of costs associated with our operations. The original World Gold Council (“WGC”) Guidance Note explicitly excluded certain financing activities from all-in sustaining costs and all-in costs. As a result of the new lease accounting standard, the WGC Guidance Note was updated to include both the principal and interest portion of the cash lease payment in the all-in sustaining costs and all-in cost metrics. We have updated our calculation accordingly. Prior periods have not been restated but would not be materially different.

 

 

 INDEX    page

Overview

  

Our Vision

   32

Our Business

   32

Our Strategy

   32

Sustainability

   32

Financial and Operating Highlights

   34

Safety

   38

Environment

   38

Climate Change

   38

Reserves and Resources

   39

Key Business Developments

   40

Outlook for 2020

   43

Risks and Risk Management

   46

Market Overview

   47

Production and Cost Summary

   49

Operating Divisions Performance

   51

Nevada Gold Mines

   52

Carlin

   53

Cortez

   55

Turquoise Ridge

   57

Other Nevada Gold Mines

   59

Pueblo Viejo

   60

Loulo-Gounkoto

   62

Kibali

   64

Veladero

   66

Porgera

   68

North Mara

   70

Other Mines - Gold

   72

Other Mines - Copper

   73

Growth Projects

   74

Exploration

   75

 

     page
Review of Financial Results    78

Revenue

   78

Production Costs

   79

Capital Expenditures

   81

General and Administrative Expenses

   81

Exploration, Evaluation and Project Costs

   82

Finance Costs, Net

   82

Additional Significant Statement of Income

Items

   83

Income Tax Expense

   84
Financial Condition Review    86

Balance Sheet Review

   86

Shareholders’ Equity

   86

Financial Position and Liquidity

   86

Summary of Cash Inflow (Outflow)

   87

Summary of Financial Instruments

   88
Commitments and Contingencies    89
Review of Quarterly Results    90
IFRS Critical Accounting Policies and Accounting Estimates    90
Non-GAAP Financial Performance Measures    91
Technical Information    113
Endnotes    113
Glossary of Technical Terms    118
Mineral Reserves and Mineral Resources    119
 

 

BARRICK YEAR-END 2019   31   MANAGEMENT’S DISCUSSION AND ANALYSIS


OVERVIEW

Our Vision

We strive to be the world’s most valued gold mining business by finding, developing and owning the best assets, with the best people, to deliver sustainable returns for our owners and partners.

Our Business

Barrick is one of the world’s leading gold mining companies with annual gold production and gold reserves that are among the largest in the industry. We are principally engaged in the production and sale of gold and copper, as well as related activities such as exploration and mine development. We hold interests in fifteen producing gold mines, including six Tier One Gold Assets1 and a diversified asset portfolio positioned for growth in many of the world’s most prolific gold districts. These gold mines are geographically diversified and are located in Argentina, Canada, Côte d’Ivoire, the Democratic Republic of Congo, the Dominican Republic, Mali, Papua New Guinea, Tanzania and the United States. Our copper business includes a wholly-owned copper mine in Zambia and 50% interests in copper mines in Chile and Saudi Arabia. We also have exploration and development projects located throughout the Americas and Africa. We sell our production in the world market through the following distribution channels: gold bullion is sold in the gold spot market; and gold and copper concentrate is sold to independent smelting companies. Barrick shares trade on the New York Stock Exchange under the symbol GOLD and the Toronto Stock Exchange under the symbol ABX.

2019 Revenue (millions)

 

LOGO

Our Strategy

Our strategy is to operate as business owners by attracting and developing world-class people who are informed and involved in the value chain of the business, act with integrity and are tireless in their pursuit of excellence. We are focused on returns to our stakeholders by optimizing free cash flow, managing risk to create long-term value for our shareholders and partnering with host governments and communities to transform their natural resources into sustainable benefits and mutual prosperity. We aim to achieve this through the following:

Asset Quality

 

Grow and invest in a portfolio of Tier One Gold Assets1, Tier Two Gold Assets and Strategic Assets2 with an emphasis on organic growth. We will focus our efforts on

   

identifying, investing in and developing assets that meet our investment criteria. With respect to Tier One Gold Assets, we are focused on assets with a reserve potential greater than 5 million ounces of gold that will generate an internal rate of return (IRR) of at least 15%. With respect to Tier Two Gold Assets, we are focused on assets with a reserve potential of greater than 3 million ounces of gold that will generate an IRR of at least 20% (in each case based on our long-term gold price assumptions).

 

Focus on brownfields opportunities at Nevada Gold Mines LLC (“Nevada Gold Mines”) following the integration of Barrick’s and Newmont Corporation’s (“Newmont”) interests in Nevada through the creation of the joint venture, together with Pueblo Viejo, Loulo-Gounkoto and Kibali.

 

Invest in exploration across extensive land positions in many of the world’s most prolific gold districts.

 

Maximize the long-term value of our strategic Copper Business3.

  Sell non-core assets over time in a disciplined manner.

Operational Excellence

  Strive for zero harm workplaces.
 

Operate a flat management structure with a strong ownership culture.

 

Streamline management and operations, and hold management accountable for the businesses they manage.

 

Leverage innovation and technology to drive industry-leading efficiencies.

 

Build trust-based partnerships with host governments, business partners, and local communities to drive shared long-term value.

Sustainable Profitability

 

Follow a disciplined approach to growth, emphasizing long-term value for all stakeholders.

 

Increase returns to shareholders, driven by a focus on return on capital, internal rate of return and free cash flow.

Sustainability

Barrick’s sustainability vision is to create long-term value for all our stakeholders. We contribute to the social and economic development of our host countries and communities. We protect the safety and health of our workforce. We respect human rights. And we manage our impacts on the natural environment, both today and with future generations in mind. We live our vision every day, by embedding environmental, social and economic considerations into all our business decisions, through partnerships with host governments and communities and by engaging respectfully with all our stakeholders.

Our approach to achieving these four ambitions is set out in a new overarching Sustainable Development Policy, which commits us to supporting the socio-economic development of host countries and communities. We have also published policies in the areas of Social Performance, which incorporates Community Development and Engagement, Occupational Health and Safety, and Environment and Human Rights. All policies meet or exceed the requirements of host country legislation and international standards such

 

 

BARRICK YEAR-END 2019   32   MANAGEMENT’S DISCUSSION AND ANALYSIS


as the IFC Performance Standards or UN Guiding Principles on Business and Human Rights. Our updated Code of Conduct sets out the ethical behavior expected of everyone working at, or with, Barrick.

Day-to-day ownership of sustainability risks and opportunities is in the hands of individual sites - where our core business is located. Each operation’s General Manager, supported by dedicated teams on site, is accountable for putting Barrick’s vision into action at the site level. This includes maintaining an ISO-certified environmental and safety management system, building robust community engagement mechanisms and managing energy and water plans.

We anticipate that the social and environmental expectations of mining companies will become even higher in the future. We are clear that our ability to maintain our social license to operate will depend on our ability to meet these expectations. To meet this challenge, we will continue to embed environmental, social and economic considerations into our business decisions, engage respectfully with stakeholders and act on their concerns and continue to build deep partnerships with our communities, host governments and other partners.

    

 

 

BARRICK YEAR-END 2019   33   MANAGEMENT’S DISCUSSION AND ANALYSIS


FINANCIAL AND OPERATING HIGHLIGHTS

 

(unaudited)    For the three months ended     For the years ended  
      12/31/2019     9/30/2019     % Change     12/31/19     12/31/18     % Change     12/31/17  

Financial Results ($ millions)

              

Revenues

     2,883       2,678       8     9,717       7,243       34     8,374  

Cost of sales

     1,987       1,889       5     6,911       5,220       32     5,300  

Net earnings (loss)a

     1,387       2,277       (39 )%      3,969       (1,545     357     1,438  

Adjusted net earningsb

     300       264       14     902       409       121     876  

Adjusted EBITDAb

     1,562       1,297       20     4,833       3,080       57     4,115  

Adjusted EBITDA marginc

     54     48     13     50     43     16     49

Total minesite sustaining capital expendituresd

     394       406       (3 )%      1,320       968       36     1,116  

Total project capital expendituresd

     46       96       (52 )%      370       425       (13 )%      280  

Total consolidated capital expendituresd,e

     446       502       (11 )%      1,701       1,400       22     1,396  

Net cash provided by operating activities

     875       1,004       (13 )%      2,833       1,765       61     2,065  

Net cash provided by operating activities marginf

     30     37     (19 )%      29     24     21     25

Free cash flowb

     429       502       (15 )%      1,132       365       210     669  

Net earnings (loss) per share (basic and diluted)

     0.78       1.30       (40 )%      2.26       (1.32     271     1.23  

Adjusted net earnings (basic)b per share

     0.17       0.15       13     0.51       0.35       46     0.75  

Weighted average diluted common shares (millions of shares)

     1,778       1,756       1     1,758       1,167       51     1,166  

Operating Results

              

Gold production (thousands of ounces)g

     1,439       1,306       10     5,465       4,527       21     5,323  

Gold sold (thousands of ounces)g

     1,413       1,318       7     5,467       4,544       20     5,302  

Market gold price ($/oz)

     1,481       1,472       1     1,393       1,268       10     1,257  

Realized gold priceb,g ($/oz)

     1,483       1,476       0     1,396       1,270       10     1,258  

Gold cost of sales (Barrick’s share)g,h ($/oz)

     1,046       1,065       (2 )%      1,005       892       13     794  

Gold total cash costsb,g ($/oz)

     692       710       (3 )%      671       588       14     526  

Gold all-in sustaining costsb,g ($/oz)

     923       984       (6 )%      894       806       11     750  

Copper production (millions of pounds)i

     117       112       4     432       383       13     413  

Copper sold (millions of pounds)i

     91       65       40     355       382       (7 )%      405  

Market copper price ($/lb)

     2.67       2.63       2     2.72       2.96       (8 )%      2.80  

Realized copper priceb,i ($/lb)

     2.76       2.55       8     2.77       2.88       (4 )%      2.95  

Copper cost of sales (Barrick’s share)i,j ($/lb)

     2.26       2.00       13     2.14       2.40       (11 )%      1.77  

Copper C1 cash costsb,i ($/lb)

     1.90       1.62       17     1.69       1.97       (14 )%      1.66  

Copper all-in sustaining costsb,i ($/lb)

     2.82       2.58       9     2.52       2.82       (11 )%      2.34  
      
As at
12/31/19
 
 
   
As at
9/30/19
 
 
   
%
Change
 
 
   
As at
12/31/18
 
 
   
%
Change
 
 
   
As at
12/31/17
 
 
       

Financial Position ($ millions)

              

Debt (current and long-term)

     5,536       5,560       0     5,738       (4 )%      6,423    

Cash and equivalents

     3,314       2,405       38     1,571       111     2,234    

Debt, net of cash

     2,222       3,155       (30 )%      4,167       (47 )%      4,189          

 

a.

Net earnings (loss) represents net earnings (loss) attributable to the equity holders of the Company.

b.

Adjusted net earnings, adjusted EBITDA, free cash flow, adjusted net earnings per share, realized gold price, all-in sustaining costs, total cash costs, C1 cash costs and realized copper price are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure to the most directly comparable IFRS measure, please see pages 91 to 112 of this MD&A.

c.

Represents adjusted EBITDA divided by revenue.

d.

Amounts presented on a consolidated cash basis. Project capital expenditures are included in our calculation of all-in costs, but not included in our calculation of all-in sustaining costs.

e.

Total consolidated capital expenditures also includes capitalized interest.

f.

Represents net cash provided by operating activities divided by revenue.

g.

Includes Tanzania on a 63.9% basis until September 30, 2019 (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience), Pueblo Viejo on a 60% basis, South Arturo on a 60% basis (36.9% from July 1, 2019 onwards as a result of its contribution to Nevada Gold Mines), and Veladero on a 50% basis, which reflects our equity share of production and sales. Also includes Loulo-Gounkoto on an 80% basis, Kibali on a 45% basis, Tongon on an 89.7% basis and Morila on a 40% basis, which reflects our equity share of production and sales, commencing January 1, 2019, the effective date of the Merger. Also removes the non-controlling interest of 38.5% Nevada Gold Mines from July 1, 2019 onwards.

h.

Gold cost of sales (Barrick’s share) is calculated as cost of sales - gold on an attributable basis (excluding sites in care and maintenance) divided by ounces sold.

i.

Amounts reflect production and sales from Jabal Sayid and Zaldívar on a 50% basis, which reflects our equity share of production, and Lumwana.

j.

Copper cost of sales (Barrick’s share) is calculated as cost of sales - copper plus our equity share of cost of sales attributable to Zaldívar and Jabal Sayid divided by pounds sold.

 

BARRICK YEAR-END 2019   34   MANAGEMENT’S DISCUSSION AND ANALYSIS


LOGO

 

a.

These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure to the most directly comparable IFRS measure, please see pages 91 to 112 of this MD&A.

b.

Cost of sales applicable to gold per ounce is calculated using cost of sales applicable to gold on an attributable basis (removing the non-controlling interest of 40% Pueblo Viejo, 36.1% Tanzania (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience) and 40% South Arturo from cost of sales (63.1% of South Arturo from July 1, 2019 onwards as a result of its contribution to Nevada Gold Mines)), divided by attributable gold ounces. The non-controlling interest of 20% Loulo-Gounkoto and 10.3% of Tongon is also removed from cost of sales and our proportionate share of cost of sales attributable to equity method investments (Kibali and Morila) is included commencing January 1, 2019, the effective date of the Merger. Also removes the non-controlling interest of 38.5% Nevada Gold Mines from cost of sales from July 1, 2019 onwards. Cost of sales applicable to copper per pound is calculated using cost of sales applicable to copper including our proportionate share of cost of sales attributable to equity method investments (Zaldívar and Jabal Sayid), divided by consolidated copper pounds (including our proportionate share of copper pounds from our equity method investments).

 

BARRICK YEAR-END 2019   35   MANAGEMENT’S DISCUSSION AND ANALYSIS


Factors affecting net earnings and adjusted net earnings4 - three months ended December 31, 2019 versus September 30, 2019

Net earnings attributable to equity holders of Barrick (“net earnings”) for the three months ended December 31, 2019 were $1,387 million compared to $2,277 million in the prior quarter. The decrease was primarily due to a gain of $1.9 billion ($1.5 billion net of taxes) relating to the remeasurement of Turquoise Ridge to fair value as a result of its contribution to Nevada Gold Mines and an impairment reversal of $947 million ($663 million net of taxes) at Lumwana, both occurring in the prior quarter. In the current quarter, there were net impairment reversals of $566 million relating to an impairment reversal at Pueblo Viejo of $865 million ($277 million net of taxes and non-controlling interest) and an impairment charge at Pascua-Lama of $296 million (no tax impact).    Net earnings in the current quarter were further impacted by a $628 million gain on the de-recognition of the deferred revenue liability relating to our silver sale agreement with Wheaton Precious Metals Corp., a gain of $408 million resulting from the sale of our 50% interest in Kalgoorlie, and a gain of $216 million on a tax settlement at Lumwana.    After adjusting for items that are not indicative of future operating earnings, adjusted net earnings4 of $300 million for the three months ended December 31, 2019 were $36 million higher than the prior quarter, due to an increase in revenue resulting from higher sales volume and marginally higher realized prices4, partially offset by higher cost of sales resulting from the increased sales volume.

Significant adjusting items (pre-tax and excluding non-controlling interest effects) in the three months ended December 31, 2019 include:

   

$845 million in other income adjustments, primarily related to a $628 million gain on the de-recognition of the deferred revenue liability relating to our silver sale agreement with Wheaton Precious Metals Corp. and a gain of $216 million on a tax settlement at Lumwana;

   

$566 million in net impairment reversals, relating to Pueblo Viejo, partially offset by impairment charges at Pascua-Lama; and

   

$414 million in acquisition/disposition gains, primarily resulting from the sale of our 50% interest in Kalgoorlie.

Refer to page 91 for a full list of reconciling items between net earnings and adjusted net earnings4 for the current and previous periods.

Factors affecting net earnings and adjusted net earnings4 - year ended December 31, 2019 versus December 31, 2018

Net earnings for the year ended December 31, 2019 were $3,969 million compared to a loss of $1,545 million in the same prior year period. The significant increase was mainly due to a gain of $1.9 billion ($1.5 billion net of taxes) relating to the remeasurement of Turquoise Ridge to fair value as a result of its contribution to Nevada Gold Mines and a gain of $408 million resulting from the sale of our 50% interest in Kalgoorlie. This was combined with impairment reversals at Lumwana of $947 million ($663 million net of taxes) and at Pueblo Viejo of $865 million ($277 million net of taxes and non-controlling interest), partially offset by an impairment charge at Pascua-Lama of $296 million (no tax impact). In addition to these impacts, there were significant tax adjustments relating to the de-recognition of deferred tax assets of $814 million occurring in the prior year, a $628 million gain on the de-recognition of the deferred revenue liability relating to our silver sale agreement with Wheaton Precious Metals Corp., and a gain of $216 million on a tax settlement at Lumwana. After adjusting for items that are not indicative of future operating earnings, adjusted net earnings4 of $902 million for the year ended December 31, 2019 were $493 million higher than the same prior year period. The increase in adjusted net earnings was primarily due to higher sales volumes as a result of the Merger and the formation of Nevada Gold Mines. Excluding the impact of the Merger and the formation of Nevada Gold Mines, the increase in adjusted net earnings was primarily due to an increase in realized gold prices4.

Significant adjusting items (pre-tax and excluding non-controlling interest effects) in the year December 31, 2019 include:

   

$2,327 million in acquisition/disposition gains mainly relating to the remeasurement of Turquoise Ridge to fair value as a result of its contribution to Nevada Gold Mines and a gain of $408 million resulting from the sale of our 50% interest in Kalgoorlie;

   

$1,423 million in net impairment reversals, relating to Lumwana and Pueblo Viejo, partially offset by impairments at Pascua-Lama; and

   

$687 million in other income adjustments, primarily related to a $628 million gain on the de-recognition of the deferred revenue liability relating to our silver sale agreement with Wheaton Precious Metals Corp. and a gain of $216 million on a tax settlement at Lumwana, partially offset by severance costs as a result of the implementation of a number of organizational reductions.

Refer to page 91 for a full list of reconciling items between net earnings and adjusted net earnings4 for the current and previous periods.

 

BARRICK YEAR-END 2019   36   MANAGEMENT’S DISCUSSION AND ANALYSIS


Factors affecting Operating Cash Flow and Free Cash Flow4 - three months ended December 31, 2019 versus September 30, 2019

In the three months ended December 31, 2019, we generated $875 million in operating cash flow, compared to $1,004 million in the prior quarter. The decrease of $129 million was primarily due to an increase in interest paid as a result of the timing of interest payments on our public market debt, partially offset by an increase in gold and copper sales volumes of 7% and 40%, respectively. This was further impacted by higher gold and copper realized prices4 of $1,483 per ounce and $2.76 per pound, respectively, for the three months ended December 31, 2019, compared to $1,476 per ounce and $2.55 per pound, respectively, in the prior quarter.

Free cash flow4 for the three months ended December 31, 2019 was $429 million, compared to $502 million in the prior quarter, reflecting lower operating cash flows, partially offset by lower capital expenditures. In the three months ended December 31, 2019, capital expenditures on a cash basis were $446 million compared to $502 million in the prior quarter primarily due to lower project capital expenditures with the most significant change related to Cortez due to decreases at the Cortez Hills Underground Rangefront project.

Factors affecting Operating Cash Flow and Free Cash Flow4 - year ended December 31, 2019 versus December 31, 2018

For the year ended December 31, 2019, we generated $2,833 million in operating cash flow, compared to $1,765 million in the same prior year period. The increase of $1,068 million was primarily due to higher sales volume as a result of the Merger and the formation of Nevada Gold Mines. This was combined with higher realized gold prices4 of $1,396 per ounce in 2019 compared to $1,270 per ounce in 2018 and, partially offset by higher cost of sales per ounce5.

For 2019, we generated free cash flow4 of $1,132 million compared to $365 million in 2018. The increase primarily reflects higher operating cash flows, partially offset by higher capital expenditures. In 2019, capital expenditures on a cash basis were $1,701 million compared to $1,400 million in the same prior year period. Higher capital expenditures of $301 million were primarily due to an increase in minesite sustaining capital expenditures as a result of the Merger and the consolidation impact of Nevada Gold Mines, partially offset by lower project capital expenditures at Cortez due to decreasing Crossroads dewatering activities and Rangefront project expenditures.

 

BARRICK YEAR-END 2019   37   MANAGEMENT’S DISCUSSION AND ANALYSIS


Safety

Our safety vision is “Every person going home safe and healthy every day.” In 2019, although we operated with zero fatalities, our Total Reportable Injury Frequency Rate6 (“TRIFR”) increased by 5%, from 2.12 to 2.24, year-over-year. In analyzing the incidents and frequencies, the combination of assets into Nevada Gold Mines in the North America region did have an impact on our performance. The Africa and Middle East region improved year-on-year in both Lost Time Injuries (“LTIs”) and TRIFR.

Barrick is fully committed to the safety, health and well-being of our people, their families and the communities in which we operate. We review safety performance and incidents, share lessons learned and communicate best practices across our business during weekly Executive Committee Review meetings, the main forum for senior management to review our current safety performance. We will continue our efforts to further reduce injury occurrences.

Every site has its own site-specific safety procedures, management plans and systems in place, in line with international best practice. Our goal is for the safety management systems at all operational mines to be certified to the internationally recognized ISO 45001 standard by the end of 2021.

Our renewed focus on safety and reaffirmed commitment to prevent fatalities has led to the company-wide roll out of new controls including our ten Fatality Prevention Commitments to help eliminate fatalities and serious injuries. Our Fatality Prevention Commitments align with the International Council on Mining and Metal’s Life Saving Controls, which are based upon lessons learned from fatal incidents within the mining industry, including Barrick’s experience. Our Commitments and Unacceptable Behaviors guideline has also been implemented, which reaffirms our zero tolerance policy for behavior such as working on site under the influence of drugs or alcohol.

Environment

Barrick continues to rebuild its reputation for environmental excellence and aims to become the world’s most valued gold mining business by delivering sustainable returns for our owners and partners, including the host communities and countries in which we operate.

We have set a corporate goal for all sites to have their Environmental Management System (“EMS”) certified to the ISO 14001:2015 standard by the end of 2020. Currently, all operations, except the Jabal Sayid mine in Saudi Arabia and the Tanzanian assets, are certified to this standard.

In 2019, we introduced a new Environmental Incident Reporting and Investigation Standard to better define the classification, reporting, responsibility and investigation of environmental incidents at Barrick sites. As defined by our new system, we had zero Class 1 - High Significance7 incidents and 13 Class 2 - Medium Significance8 incidents in 2019.

Climate Change

Climate change, including shifts in temperature and precipitation and more frequent severe weather events, could affect the mining industry in a range of possible ways. Volatile

climatic conditions can affect the stability and effectiveness of infrastructure and equipment; potentially impact environmental protection and site closure practices; lead to changes in the regulatory environment, including increased carbon tax regimes; and potentially impact the stability and cost of water and energy supplies. We therefore view climate change as a company, community, and global concern. In 2019, following our merger with Randgold and the formation of Nevada Gold Mines, we reviewed and updated the climate change strategy developed in 2017.

Barrick’s climate change strategy has three pillars: identify, understand and mitigate the risks associated with climate change; measure and reduce our impacts on climate change; and improve our disclosure on climate change. Action taken on each pillar in 2019 is described below.

Identify, understand and mitigate the risks associated with climate change

We continue to take steps to identify and manage risks and build resilience to climate change, as well as to position ourselves for new opportunities. In 2019, climate change- related factors continued to be incorporated into Barrick’s formal risk assessment process (for example, consideration is given to the availability of and access to water and the impact of increased precipitation, drought, or severe storms on operations as well as on communities near our operations). We have identified several climate-related risks and opportunities for our business: physical impacts of climate change, such as an increase in extended duration extreme precipitation events; an increase in regulations that seek to address climate change; and increased global investment in innovation and low-carbon technologies.

Measure and reduce the Company’s impact on climate change

Mining is an energy-intensive business, and we understand the important link between energy use and greenhouse gas (“GHG”) emissions. By effectively managing our energy use, we can reduce our draw from local energy grids, reduce our GHG emissions, achieve more efficient production, and reduce direct mining costs. In 2019, we progressed the conversion of the Quisqueya I power generation facility in the Dominican Republic from heavy fuel oil to natural gas. We expect the power plant to receive its first liquefied natural gas deliveries in first quarter 2020. The conversion will help reduce the mine site’s power generation costs and GHG emissions by 30%. We also advanced a power transmission project at Veladero to connect the mine to grid power and started construction of a solar plant at Loulo-Gounkoto. Each of these projects is expected to reduce the need for diesel generators, thereby reducing our emissions and power generation costs.

Improve our disclosure on climate change

In 2019, one of our first reporting activities as a merged Company was to complete the CDP (formerly known as the Carbon Disclosure Project) emissions questionnaire which makes investor-relevant climate data widely available.

Throughout 2019, the Board’s Corporate Governance & Nominating Committee, which met quarterly, was responsible for overseeing Barrick’s policies, programs, and performance relating to the environment, including climate change. The Audit & Risk Committee assisted the Board in overseeing the Company’s management of enterprise risks as well as the implementation of policies and standards for monitoring and

 

 

BARRICK YEAR-END 2019   38   MANAGEMENT’S DISCUSSION AND ANALYSIS


mitigating such risks. Climate change is built into our formal risk management process, outputs of which were reviewed by the Audit & Risk Committee throughout 2019. In addition, the Audit & Risk Committee reviewed the Company’s approach to climate change in the context of Barrick’s public disclosure.

At the management level, in furtherance of its commitment to sustainability, Barrick established the Environmental and Social Oversight (“E&S”) Committee in 2019. The E&S Committee is chaired by the President and Chief Executive Officer, and includes each of the regional Chief Operating Officers, Mine General Managers and health, safety, and environment and closure leads, as well as the Group Sustainability Executive and an independent sustainability consultant. The E&S Committee meets each quarter to review the Company’s sustainability performance and compliance with its sustainability policies, as well as to identify concerns and opportunities at the Company’s operations at an early stage. The President and Chief Executive Officer reviews the reports of the E&S Committee with the Corporate Governance & Nominating Committee on a quarterly basis as part of the Committee’s mandate to oversee Barrick’s environmental, safety and health, corporate social responsibility, and human rights programs, policies and performance.

Further to the specific focus of the E&S Committee, regular Executive Committee review meetings throughout 2019 allowed for the discussion of opportunities and risks that may help or hinder the Company from achieving its objectives, including climate-related risks (e.g., spring snow melts, hurricanes, flooding, and mud slides).

We expect our climate change activities to continue into 2020 and beyond. Site-level climate-related risks and mitigation plans will continue to be reviewed in the context of the company-wide risk assessment, and site-level plans to reduce energy and GHG emissions will be strengthened. We also expect to continue providing our climate-related disclosure. Overall, based on the work completed, Barrick continues to build resilience to withstand the potential impacts of climate change and leverage potential opportunities as the global economy transitions to a low-carbon future.

Reserves and Resources

Gold

Barrick’s 2019 reserves were calculated using a gold price assumption of $1,200 per ounce, consistent with 2018. As of December 31, 2019, Barrick’s proven and probable gold reserves were 71 million ounces9 at an average grade of 1.68 g/t, compared to 62 million ounces10 at an average grade of 1.56 g/t in the previous year. Reserve replenishment was achieved across the majority of Barrick’s Tier One Assets1, including Kibali, Loulo-Gounkoto, Turquoise Ridge, together with Goldstrike and Leeville in the Carlin Complex.

There were several significant changes to mineral reserves year-on-year, including the Merger with Randgold, the formation of Nevada Gold Mines with Newmont, the acquisition of the minority interests in Acacia and the divestiture of Kalgoorlie, which had the net impact of adding 13.4 million ounces to attributable proven and probable mineral reserves. Successful mineral resource conversion

added 5.9 million ounces to mineral reserves offsetting annual mining depletion of 6.0 million ounces of mining depletion.

In 2019, the principal addition to mineral reserves was through the Merger with Randgold, which added 13 million ounces at an average grade of 4.0 g/t to Barrick’s attributable proven and probable reserves. The Nevada Gold Mines transaction added a further 3.2 million ounces to attributable proven and probable reserves, net of the changes in ownership. Barrick’s acquisition of the minorities’ interest in Acacia and subsequent signing of the framework agreement with the Government of Tanzania (“GoT”), through which the GoT will acquire a 16% free-carried interest in the former Acacia sites, resulted in the addition of a further 1 million ounces in Barrick’s 84% attributable proven and probable reserves for North Mara, Bulyanhulu and Buzwagi. These additions from acquisition were partially offset by the removal of 3.7 million ounces of attributable proven and probable reserves from the divestment of Kalgoorlie.

In 2019, we also added 5.9 million ounces of attributable proven and probable reserves through the conversion of mineral resources as summarized below.

The Africa and Middle East region added 2.1 million ounces, of which Loulo-Gounkoto and Kibali were the primary contributors adding a combined 1.6 million ounces of attributable proven and probable reserves. This was principally from high-grade underground extensions at Yalea and KCD underground, as well as the addition of the Kalimva-Ikamva open pit at Kibali. Additional contributions came from an increase in the gold price assumption used to estimate mineral reserves to $1,200 per ounce (from $1,000 per ounce) for the acquired Randgold assets. Notably, proven and probable mineral reserve grades at both Loulo-Gounkoto and Kibali have stayed relatively consistent year-on-year, highlighting the quality of these Tier One Assets.

North America added 2.8 million ounces of attributable proven and probable reserves, principally from high-grade underground extensions in Carlin and Turquoise Ridge. As expected, the elimination of the previous Toll Milling Agreement following the formation of Nevada Gold Mines allowed us to optimize the underground cut-off grade at Turquoise Ridge and contribute to the year-on-year increase in reserves. For further information on Goldrush and Fourmile, please refer to the Projects section of this MD&A.

Supporting their potential to become Tier One Assets, Veladero and Porgera added a combined 1.0 million ounces of attributable proven and probable reserves. This was mainly due to the conversion of mineral resources at Veladero and underground extensions at Porgera.

The additions described above were partially offset by mining depletion of 6.0 million ounces of attributable proven and probable reserves, other losses of 4.5 million ounces, which were primarily comprised of the removal of the Phase Six pushback at Hemlo and the reclassification of 3.8 million ounces from mineral reserves at Lagunas Norte to mineral resources, in line with our decision to put the property on care and maintenance in 2019.

 

 

BARRICK YEAR-END 2019   39   MANAGEMENT’S DISCUSSION AND ANALYSIS


In 2019, all mineral resources were calculated using a gold price assumption of $1,500 per ounce, consistent with 2018. Barrick’s mineral resources for 2019 are now reported on an inclusive basis, and include all areas that form mineral reserves, reported at a mineral resource cut-off grade and the assumed commodity price. All open pit mineral resources are contained within a Whittle shell, while all underground mineral resources are contained within stope optimizer shells.    As of December 31, 2019, measured and indicated gold resources were 170 million ounces9 at an average grade of 1.55 g/t and inferred gold resources were 39 million ounces9 at an average grade of 1.3 g/t.

Copper

Copper mineral reserves for 2019 were calculated using a copper price of $2.75 per pound and mineral resources at $3.50 per pound, consistent with 2018. As of December 31, 2019, proven and probable copper reserves were 13 billion pounds9, compared to 11 billion pounds10 at the end of 2018. The growth of copper mineral reserves was primarily driven by Lumwana which added 2.2 billion pounds of proven and

probable reserves. This was from a combination of reclassification and remodeling of the Chimiwungo pit and mine cost optimization. This optimization was a direct outcome of improved plant throughput and mining efficiency in 2019, resulting in a reduction of the cut-off grade at Lumwana.

Measured and indicated copper resources were 26 billion pounds9 at an average grade of 0.38% and inferred copper resources were 2.2 billion pounds9 at an average grade of 0.2% as of December 31, 2019. An increase in copper mineral resources at Zaldívar was driven by the inclusion of leachable primary sulfide ore. Zaldívar is jointly owned by Antofagasta and Barrick and is operated by Antofagasta.

The 2019 mineral reserves and mineral resources are estimated using the combined value of gold, copper and silver. Accordingly mineral reserves and mineral resources are reported for all assets where copper or silver is produced and sold as a primary product or a by-product.

 

 

Key Business Developments

 

2019 Highlights

 

Successful integration of former Randgold executive team and establishment of two additional regions modeled on the Africa regional team after transformational Merger completed on January 1, 2019

 

Negotiation, completion and integration of former Barrick and Newmont operations in Nevada to form the Nevada Gold Mines joint venture - the single largest gold complex in the world and unlocking up to $500 million per annum in synergies

 

Acquisition of Acacia minority shareholdings and finalization of agreement to end dispute with the Government of Tanzania and restore our license to operate

 

Further rationalization of our portfolio to focus on Tier One Gold Assets1, Tier Two Gold Assets and Strategic Assets2 with the divestment of Kalgoorlie and pending sale of Massawa (expected to close in the first quarter of 2020)

 

Full year gold production at upper end and copper production above guidance ranges

 

Strengthened balance sheet through positive free cash flow, dispositions of non-core assets and debt repurchases

 

Debt, net of cash, now at $2.2 billion, a 47% decrease from the prior year and the lowest level since 2007

 

Increasing shareholder returns having raised the quarterly dividend three times in respect of 2019 performance

Sale of Massawa

On December 10, 2019, Barrick announced that it and its Senegalese joint venture partner have reached an agreement to sell their aggregate 90% interest in the Massawa project (“Massawa”) in Senegal to Teranga Gold Corporation (“Teranga”) for total consideration of up to $430 million.

The consideration consists of an up-front payment of $380 million, including a cash payment of approximately $300 million and Teranga common shares, plus a contingent payment of up to $50 million which is based upon the average gold price for the three-year period immediately following closing.

 

Barrick will receive 92.5% of the total purchase price for its interest in the Massawa project, with the balance to be received by Barrick’s local Senegalese partner for its minority interest. Barrick is providing $25 million of the $225 million syndicated debt financing secured by Teranga in connection with the transaction.

The transaction is expected to close in the first quarter of 2020 and is subject to receipt of the Massawa exploitation license and residual exploration license from the Government of Senegal, certain other acknowledgments from the Government of Senegal and other customary closing conditions.

Sale of Kalgoorlie

On November 28, 2019, we completed the sale of our 50% interest in the Kalgoorlie mine in Western Australia to Saracen Mineral Holdings Limited for total cash consideration of $750 million. The transaction resulted in a gain of $408 million for the year ended December 31, 2019.

Pascua-Lama

In the fourth quarter of 2019, we completed a study of the Pascua-Lama project and concluded that we do not have a plan that meets our investment criteria under our current assumptions. This was an indicator of impairment and we concluded that the carrying value of Pascua-Lama exceeded the Fair Value Less Cost to Dispose (“FVLCD”) and we recorded a non-current asset impairment of $296 million, based on a FVLCD of $398 million.

We have also updated the liability for the silver stream agreement to align with the conclusions from the completion of the study. The deferred revenue liability was derecognized, and a current liability was recognized for the residual balance payable to Wheaton Precious Metals Corp. of $253 million under the agreement. This adjustment resulted in $628 million recorded in Other Income.

In addition, a new closure plan and estimate supported by feasibility level engineering studies was finalized, which

 

 

BARRICK YEAR-END 2019   40   MANAGEMENT’S DISCUSSION AND ANALYSIS


resulted in a decrease in the provision for environmental rehabilitation liability of $270 million.

Barrick’s intention is to update our geological understanding of the orebody and this process is expected to take a number of years to complete. The focus in 2020 at Pascua-Lama will be on addressing the gaps identified in the geological and geo-metallurgical understanding of the orebody, building upon the improved 3D geology model completed in 2019. This includes a drill program at the Penelope deposit of Lama, as well as column testing to assess the amenability of Penelope ore for heap leaching at Veladero. Refer to the Exploration section of the MD&A for more information.

Acacia Mining plc

On September 17, 2019, Barrick acquired all of the Acacia Mining plc (“Acacia”) shares we did not already own through a share-for-share exchange of 0.168 Barrick shares and any Acacia Exploration Special Dividends for each ordinary share of Acacia. The Acacia Exploration Special Dividends11 and any deferred cash consideration dividends (if applicable) will be paid as a consequence of a sales process to realize value from the sale of certain Acacia exploration properties to be undertaken during the two-year period following closing. This transaction resulted in the issuance of 24,836,876 Barrick common shares or approximately 1% of Barrick’s share capital. As a result, Acacia ceased trading on the London Stock Exchange and became a wholly-owned subsidiary of Barrick called Barrick TZ Limited.

Notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience. As at September 30, 2019, we derecognized the non-controlling interest on the balance sheet related to our former 63.9% ownership of Acacia to reflect our 100% interest at that time. The former Acacia mine sites (Bulyanhulu, North Mara and Buzwagi) will now be referred to individually in this report.

On January 24, 2020, Barrick announced that the Company had ratified the creation of Twiga Minerals Corporation (“Twiga”) at a signing ceremony with the President of Tanzania, formalizing the establishment of a joint venture between Barrick and the Government of Tanzania (“GoT”) and resolution of all outstanding disputes between Barrick and the GoT, including the lifting of the previous concentrate export ban, effective immediately. The GoT will receive a free carried shareholding of 16% in each of the former Acacia mines (Bulyanhulu, Buzwagi and North Mara), and will receive its half of the economic benefits from taxes, royalties, clearing fees and participation in all cash distributions made by the mines and Twiga, after the recoupment of capital investments. Twiga will provide management services to the mines.

The terms of the signed agreement are consistent with those previously announced, including the payment of $300 million to settle all outstanding tax and other disputes (the “Settlement Payment”); the lifting of the concentrate export ban; the sharing of future economic benefits from the mines on a 50/50 basis; and a dispute resolution mechanism that provides for binding international arbitration. The 50/50 division of economic benefits will be maintained through an annual true-

up mechanism, which will not account for the Settlement Payment.

Barrick and the GoT continue to fulfill their respective obligations to satisfy all conditions of the signed agreement, primarily with respect to the execution and delivery of formal termination documents for the settlement of all outstanding disputes between the two parties.

Operating results are included at 100% from October 1, 2019 up until the GoT’s 16% free-carried interest is made effective, which is expected to be as of January 1, 2020, and on an 84% basis thereafter.

Nevada Gold Mines LLC

On March 10, 2019, we entered into an implementation agreement with Newmont to create a joint venture, named Nevada Gold Mines, combining our respective mining operations, assets, reserves and talent in Nevada, USA. This includes Barrick’s Cortez, Goldstrike, Turquoise Ridge and Goldrush properties and Newmont’s Carlin, Twin Creeks, Phoenix, Long Canyon and Lone Tree properties. On July 1, 2019, the transaction closed and we began consolidating the operating results, cash flows and net assets of Nevada Gold Mines from that date forward. Barrick is the operator of the joint venture and owns 61.5%, with Newmont owning the remaining 38.5% of the joint venture.

As a result of this transaction, Barrick recognized a gain in our earnings for the third quarter of $1.9 billion on the remeasurement of our previous 75% interest of Turquoise Ridge.

Debt Management

On July 15, 2019, Barrick completed a make-whole repurchase of the $248 million of outstanding principal on our 4.95% Notes due 2020 and incurred a loss on debt extinguishment of $3 million in the third quarter of 2019. The debt repayment is expected to result in an annualized interest saving of $12 million.

Subsequent to year end, on January 31, 2020, Barrick completed a make-whole repurchase of the $337 million of outstanding principal on our 3.85% Notes due 2022 and a loss on debt extinguishment of $15 million will be recorded in the first quarter of 2020. The debt repayment is expected to result in an annualized interest saving of $13 million.

Debt, net of cash, has been reduced by 47% from the prior year to $2.2 billion.

Reko Diq Arbitration

On July 12, 2019, the World Bank International Centre for Settlement of Investment Disputes (“ICSID”) awarded $5.84 billion in damages to Tethyan Copper Company Pty Limited (“TCC”), a joint venture held equally by Barrick and Antofagasta plc, in relation to the arbitration claims filed against the Government of Pakistan (“GOP”) following the unlawful denial of a mining lease for the Reko Diq project in Pakistan in 2011.

Damages include compensation of $4.087 billion in relation to the fair market value of the Reko Diq project at the time the mining lease was denied, and interest until the date of the award of $1.753 billion. Compound interest continues to

 

 

BARRICK YEAR-END 2019   41   MANAGEMENT’S DISCUSSION AND ANALYSIS


apply at a rate of US Prime +1% per annum until the award is paid.

In November 2019, the GOP applied to annul TCC’s damages award, which resulted in an automatic stay on TCC from pursuing enforcement action. ICSID has constituted a committee to hear the annulment application, consisting of a president from South Korea and additional members from Mexico and Finland. The committee appointed by ICSID to hear the application for annulment will also determine whether the stay on enforcement proceedings should be extended or lifted while it considers the application for annulment. No decision on the GOP’s annulment application or the stay on enforcement proceedings has yet been made.

The proceeds of this award will not be recognized in our financial statements until any such proceeds have been collected.

Randgold Resources Limited Merger

On January 1, 2019, we acquired 100% of the issued and outstanding shares of Randgold. Each Randgold shareholder received 6.1280 common shares of Barrick for each Randgold share, which resulted in the issuance of 583,669,178 Barrick common shares. After this share issuance, Barrick shareholders owned 66.7%, while former Randgold shareholders owned 33.3%, of the shares of the combined company. We have determined that this transaction represents a business combination with Barrick identified as the acquirer. Based on the December 31, 2018 closing share price of Barrick’s common shares, the total consideration of the acquisition was $7.9 billion.

Randgold was a publicly traded mining company with ownership interests in the following gold mines: Kibali in the Democratic Republic of Congo; Tongon in Côte d’Ivoire; Loulo-Gounkoto and Morila in Mali; the Massawa project in Senegal and various exploration properties. We began

consolidating the operating results, cash flows and net assets of Randgold from January 1, 2019.

In conjunction with the Merger, Barrick has a new management team, effective January 1, 2019. Mark Bristow is now President and Chief Executive Officer of Barrick. He was formerly the Chief Executive Officer of Randgold, a position he held since its incorporation in 1995. Graham Shuttleworth is now Senior Executive Vice-President and Chief Financial Officer of Barrick, having formerly served as Randgold‘s Chief Financial Officer since 2007. Kevin Thomson, Senior Executive Vice-President, Strategic Matters, continues in the role to which he was appointed at Barrick in October 2014.

In addition, Barrick is now managed by three regional Chief Operating Officers, each of whom reports to the President and Chief Executive Officer. Catherine Raw, formerly Barrick’s Chief Financial Officer, was appointed Chief Operating Officer, North America. Mark Hill, formerly Barrick’s Chief Investment Officer, was appointed Chief Operating Officer, Latin America and Asia Pacific. Willem Jacobs, formerly Randgold’s General Manager East and Central Africa, was appointed Chief Operating Officer, Africa and Middle East.

Following the closing of the Merger, Barrick’s Board of Directors was reconstituted with the following nine Directors: John Thornton (Executive Chairman), Brett Harvey (Lead Independent Director) Mark Bristow, María Ignacia Benítez, Gustavo Cisneros, Christopher Coleman, Michael Evans, Brian Greenspun, and Andrew Quinn. Regrettably, on February 28, 2019, María Ignacia Benítez passed away. Barrick’s Corporate Governance & Nominating Committee initiated a search for an equally compelling and qualified female candidate to fill the vacant Board position and on August 9, 2019, we announced the appointment of Loreto Silva to the Board of Directors as an independent director.

 

 

BARRICK YEAR-END 2019   42   MANAGEMENT’S DISCUSSION AND ANALYSIS


Outlook for 2020

Operating Division Guidance

Our 2019 gold and copper production, cost of sales, total cash costs4, all-in sustaining costs4 and 2020 forecast gold and copper production, cost of sales, total cash costs4 and all-in sustaining costs4 ranges by operating division are as follows:

 

                 
Operating Division    2019
attributable
production
(000s ozs)
    

2019
cost of
salesa

($/oz)

    

2019
total cash
costsb

($/oz)

    

2019 all-in
sustaining
costsb

($/oz)

     2020 forecast
attributable
production
(000s ozs)
     2020 forecast
cost of salesa
($/oz)
     2020
forecast total
cash costsb
($/oz)
     2020 forecast
all-in
sustaining
costsb ($/oz)
 

Gold

                       

Carlin (61.5%)c,d

     968        1,004        746        984        1,000 - 1,050        920 - 970        760 - 810        1,000 - 1,050  

Cortez (61.5%)c

     801        762        515        651        450 - 480        980 - 1,030        640 - 690        910 - 960  

Turquoise Ridge (61.5%)c

     335        846        585        732        430 - 460        900 - 950        540 - 590        690 - 740  

Phoenix (61.5%)c

     56        2,093        947        1,282        100 - 120        1,850 -1,900        700 - 750        920 - 970  

Long Canyon (61.5%)c

     58        1,088        333        681        130 - 150        910 - 960        240 - 290        450 - 500  

Nevada Gold Mines (61.5%)

     2,218        924        634        828        2,100 - 2,250        970 - 1,020        660 - 710        880 - 930  

Hemlo

     213        1,137        904        1,140        200 - 220        960 - 1,010        800 - 850        1,200 - 1,250  

North America

     2,431        943        655        851        2,300 - 2,450        970 - 1,020        660 - 710        900 - 950  

Pueblo Viejo (60%)

     590        747        471        592        530 - 580        840 - 890        520 - 570        720 - 770  

Veladero (50%)

     274        1,188        734        1,105        240 - 270        1,220 - 1,270        670 - 720        1,250 - 1,300  

Porgera (47.5%)

     284        994        838        1,003        240 - 270        890 - 940        770 - 820        960 - 1,010  

Kalgoorlie (50%)e

     206        1,062        873        1,183                                      

Latin America & Asia Pacific

     1,354        937        664        874        1,000 - 1,100        930 - 980        610 - 660        890 - 940  

Loulo-Gounkoto (80%)

     572        1,044        634        886        500 - 540        1,050 - 1,100        620 - 670        970 - 1,020  

Kibali (45%)

     366        1,111        568        693        340 - 370        1,030 - 1,080        600 - 650        790 - 840  

North Maraf

     251        953        646        802        240 - 270        750 - 800        570 - 620        830 - 880  

Tongon (89.7%)

     245        1,469        787        844        240 - 260        1,390 - 1,440        680 - 730        740 - 790  

Bulyanhuluf

     27        1,207        676        773        30 - 50        1,210 - 1,260        790 - 840        1,110 - 1,160  

Buzwagif

     83        1,240        1,156        1,178        80 - 100        850 - 900        820 - 870        850 - 900  

Africa & Middle East

     1,544        1,332        673        834        1,450 - 1,600        1,040 - 1,090        640 - 690       
870 - 920
 

Total Attributable to Barrickg,h,i,j

     5,465        1,005        671        894        4,800 - 5,200        980 - 1,030        650 - 700        920 - 970  
                                                                         
                 
     

2019
attributable
production

(M lbs)

    

2019

cost of

salesa

($/lb)

    

2019 C1
cash
costsb

($/lb)

    

2019 all-in
sustaining
costsb

($/lb)

    

2020 forecast
attributable
production

(M lbs)

    

2020 forecast
cost of salesa

($/lb)

    

2020
forecast C1
cash costsb

($/lb)

    

2020 forecast
all-in
sustaining

costsb ($/lb)

 

Copper

                       

Lumwana

     238        2.13        1.79        3.04        250 - 280        2.20 - 2.40        1.50 - 1.70        2.30 - 2.60  

Zaldívar (50%)

     128        2.46        1.77        2.15        120 - 135        2.40 - 2.70        1.65 - 1.85        2.30 - 2.60  

Jabal Sayid (50%)

     66        1.53        1.26        1.51        60 - 70        1.75 - 2.00        1.40 - 1.60        1.50 - 1.70  

Total Copperi

     432        2.14        1.69        2.52        440 - 500        2.10 - 2.40        1.50 - 1.80        2.20 - 2.50  

 

  a.

Cost of sales applicable to gold per ounce is calculated using cost of sales applicable to gold on an attributable basis (removing the non-controlling interest of 40% Pueblo Viejo, 20% of Loulo-Gounkoto, 10.3% of Tongon, 36.1% of Tanzania (notwithstanding the completion of the Acacia transaction on September 17, 2019, our results include our 63.9% share up until the end of the third quarter of 2019 as a matter of convenience) and 40% of South Arturo (63.1% of South Arturo from July 1, 2019 onwards as a result of its contribution to Nevada Gold Mines) from cost of sales and including our proportionate share of cost of sales attributable to our equity method investments in Kibali and Morila), divided by attributable gold ounces sold. Also removes the non-controlling interest of 38.5% Nevada Gold Mines from cost of sales from July 1, 2019 onwards. Cost of sales applicable to copper per pound is calculated using cost of sales applicable to copper including our proportionate share of cost of sales attributable to our equity method investments in Zaldívar and Jabal Sayid, divided by consolidated copper pounds sold (including our proportionate share of copper pounds sold from our equity method investments).

  b.

Total cash costs, all-in sustaining costs and C1 cash costs are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures of performance presented by other issuers. For further information and a detailed reconciliation of the non-GAAP measures used in this section of the MD&A to the most directly comparable IFRS measures, please see pages 91 to 112 of this MD&A.

  c.

These five operations are part of Nevada Gold Mines from July 1, 2019. Amounts include Cortez (100%), Goldstrike (100%) and Turquoise Ridge (75%), also known collectively as Barrick Nevada, from January 1, 2019 to June 30, 2019, and Cortez, Carlin (which includes Goldstrike), Turquoise Ridge (including Twin Creeks), Phoenix and Long Canyon on a 61.5% basis from July 1, 2019 onwards as a result of the formation of Nevada Gold Mines with Newmont on July 1, 2019.

  d.

Includes our 60% share of South Arturo from January 1, 2019 to June 30, 2019 and 36.9% from July 1, 2019 onwards as a result of the formation of Nevada Gold Mines with Newmont on July 1, 2019.

  e.

As a result of the sale of our 50% interest in Kalgoorlie on November 28, 2019, there is no guidance for 2020.

  f.

Formerly known as Acacia Mining plc. On September 17, 2019, Barrick acquired all of the shares of Acacia it did not own. Operating results are included at 100% from October 1, 2019 (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience) up until the GoT’s 16% free-carried interest is made effective, which is expected to be January 1, 2020, and on an 84% basis thereafter. As the GoT’s 16% free-carried interest is expected to be made effective as of January 1, 2020, our 2020 outlook represents our 84% share.

  g.

Also includes Lagunas Norte, Golden Sunlight, and Morila (40%) and excludes Pierina which is mining incidental ounces as it enters closure. Due to the planned ramp down of operations, we have ceased to include production or non-GAAP cost metrics for Golden Sunlight or Morila after the second quarter and Lagunas Norte after the third quarter.

  h.

Total cash costs and all-in sustaining costs per ounce include costs allocated to non-operating sites.

  i.

Operating division guidance ranges reflect expectations at each individual operating division, and may not add up to the company-wide guidance range total. The company-wide 2019 results and guidance ranges exclude Pierina, which is mining incidental ounces as it enters closure, and Golden Sunlight and Morila after the second quarter of 2019 and Lagunas Norte after the third quarter of 2019 due to the planned ramp down of operations.

  j.

Includes corporate administration costs.

 

BARRICK YEAR-END 2019   43   MANAGEMENT’S DISCUSSION AND ANALYSIS


Operating Division, Consolidated Expense and Capital Guidance

Our 2019 gold and copper production, cost of sales, total cash costs4, all-in sustaining costs4, consolidated expenses and capital expenditures and 2020 forecast gold and copper production, cost of sales, total cash costs4, all-in sustaining costs4, consolidated expenses and capital expenditures are as follows:

 

         
($ millions, except per ounce/pound data)    2019 Original Guidance      Q3 2019 Guidance      2019 Actual     2020 Guidance  

Gold production and costs

          

Production (millions of ounces)

     5.10 - 5.60        5.10 - 5.60        5.47       4.80 - 5.20  

Gold unit production costs

          

Cost of sales - gold ($ per oz)

     880 - 940        940 - 990        1,005       980 - 1,030  

Total cash costs ($ per oz)a

     650 - 700        650 - 700        671       650 - 700  

Depreciation ($ per oz)

     215 - 235        320 - 350        348       300 - 330  

All-in sustaining costs ($ per oz)a

     870 - 920        870 - 920        894       920 - 970  

Copper production and costs

          

Production (millions of pounds)

     375 - 430        375 - 430        432       440 - 500  

Copper unit production costs

          

Cost of sales - copper ($ per lb)

     2.30 - 2.70        2.30 - 2.70        2.14       2.10 - 2.40  

C1 cash costs ($ per lb)a

     1.70 - 2.00        1.70 - 2.00        1.69       1.50 - 1.80  

Depreciation ($ per lb)

     0.60 - 0.70        0.60 - 0.70        0.28       0.60 - 0.70  

Copper all-in sustaining costs ($ per lb)a

     2.40 - 2.90        2.40 - 2.90        2.52       2.20 - 2.50  

Exploration and project expenses

     280 - 340        280 - 340        342       280 - 320  

Exploration and evaluation

     160 - 170        170 - 180        212       210 - 230  

Project expenses

     120 - 150        120 - 150        130       70 - 90  

General and administrative expenses

     ~200        ~200        212       ~170  

Corporate administration b

     ~140        ~140        148       ~130  

Stock-based compensation c

     ~40        ~40        37       ~40  

Acacia/Tanzania d

     ~20        ~20        27       0  

Other expense (income)

     80 - 100        80 - 100        (3,100     80 - 100  

Finance costs, net e

     500 - 550        500 - 550        469       400 - 450  

Attributable capital expenditures:

          

Attributable minesite sustaining

     1,100 - 1,300        1,100 - 1,300        1,176       1,300 - 1,500  

Attributable project

     300 - 400        300 - 400        336       300 - 400  

Total attributable capital expenditures f

     1,400 - 1,700        1,400 - 1,700        1,512       1,600 - 1,900  

 

  a.

Total cash costs, all-in sustaining costs and C1 cash costs are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures of performance presented by other issuers. For further information and a detailed reconciliation of the non-GAAP measures used in this section of the MD&A to the most directly comparable IFRS measures, please see pages 91 to 112 of this MD&A.

  b.

2019 actual of $148 million includes $18 million of severance costs.

  c.

2019 actual based on US$18.59 and 2020 guidance based on a three-month trailing average ending December 31, 2019 of US$17.51 per share.

  d.

For 2019, Acacia/Tanzania general and administrative expenses were substantially comprised of stock-based compensation and severance costs related to Acacia prior to the acquisition of the non-controlling interest in September 2019.

  e.

2019 actual includes a net loss on debt extinguishment of $3 million.

  f.

Attributable capital expenditures are presented on the same basis as guidance, which includes our 61.5% share of Nevada Gold Mines, our 60% share of Pueblo Viejo, our 80% share of Loulo-Gounkoto, our 89.7% share of Tongon, our 84% share of North Mara, Bulyanhulu and Buzwagi and our 50% share of Zaldívar and Jabal Sayid. As the GoT’s 16% free-carried interest is expected to be made effective as of January 1, 2020, our 2020 outlook represents our 84% share of North Mara, Bulyanhulu and Buzwagi.

 

BARRICK YEAR-END 2019   44   MANAGEMENT’S DISCUSSION AND ANALYSIS


2020 Guidance Analysis

Estimates of future production, cost of sales, and total cash costs4 presented in this MD&A are based on mine plans that reflect the expected method by which we will mine reserves at each site. Actual gold and copper production and associated costs may vary from these estimates due to a number of operational and non-operational risk factors (see the “Cautionary Statement on Forward-Looking Information” on page 29 of this MD&A for a description of certain risk factors that could cause actual results to differ materially from these estimates).

Gold Production

We expect 2020 gold production to be in the range of 4.8 to 5.2 million ounces. As expected, gold production is lower year-over-year given the depletion of the high-grade Cortez Hills Open Pit deposit, divestment of Kalgoorlie and the decision to place Lagunas Norte, Morila and Golden Sunlight in care and maintenance in 2019. Based on mine sequencing and planned maintenance shutdowns, we expect gold production in the second half of 2020 to be slightly higher than the first half.

Gold Cost of Sales per ounce

On a per ounce basis, cost of sales applicable to gold5, after removing the portion related to non-controlling interests, is expected to be in the range of $980 to $1,030 per ounce in 2020. This is in line with the prior year resulting from a full year impact of the higher depreciation at Nevada Gold Mines offset by lower cost of sales primarily at Kibali and North Mara.

Gold Total Cash Costs per ounce4

Total cash costs per ounce4 are expected to be in the range of $650 to $700, unchanged from the 2019 range. We expect Cortez to have higher total cash costs per ounce4 than 2019 driven primarily by the cessation of the comparatively high-grade, low-cost Cortez Hills Open Pit in the first half of 2019. We also expect higher total cash costs per ounce4 at Pueblo Viejo in 2020 due to lower grades compared to the prior year, in line with the mine plan. Lower costs year-over-year at Veladero, Porgera, and North Mara are expected to offset these impacts on Barrick’s total cash costs per ounce4.

Gold All-In Sustaining Costs per ounce4

All-in sustaining costs per ounce4 are expected to be in the range of $920 to $970 for gold, slightly higher than 2019, and driven primarily by the increase in minesite sustaining capital expenditures as discussed below.

Copper Production and Costs

We expect 2020 copper production to be in the range of 440 to 500 million pounds, up from production of 432 million pounds in 2019. This increase is mainly driven by Lumwana following the sustainable improvements we have made to increase plant efficiency and availability through 2019. Together with cost rationalization, these performance improvements have driven a reduction in mining and processing costs per tonne and increased reserves.

In 2020, cost of sales applicable to copper5 is expected to be in the range of $2.10 to $2.40 per pound, in line with the $2.14 per pound outcome for 2019. C1 cash costs per pound4 guidance of $1.50 to $1.80 per pound for 2020 is also in line with 2019. Notably, we expect Lumwana C1 cash costs per pound4 of $1.50 to $1.70 to be lower year-over-year partially driven by the plant availability and efficiency improvements

we have implemented at the mine as discussed earlier. Copper all-in sustaining costs per pound4 guidance of $2.20 to $2.50 for 2020 represents an improvement from $2.52 in 2019.

Exploration and Project Expenses

We expect to incur approximately $210 to $230 million of exploration and evaluation expenditures in 2020 which includes 100% of the expenditure for Nevada Gold Mines for the full year.

We expect to incur approximately $70 to $90 million of project expenses in 2020, compared to $130 million in 2019. In 2020, project expenses are mainly related to the ongoing site costs at Pascua-Lama and advancing the expansion project at Pueblo Viejo.

General and Administrative Expenses

In 2020, we expect corporate administration costs to be approximately $130 million, a decrease of $18 million compared to 2019. This mainly reflects the additional severance costs incurred in 2019 associated with our workforce reduction following the Merger. This is partially offset by one-off integration costs associated with Randgold, Nevada Gold Mines and Acacia.

Separately, stock-based compensation expense in 2020 is expected to be approximately $40 million.

Finance Costs, Net

In 2020, net finance costs of $400 to $450 million primarily represent interest expense on long-term debt, non-cash interest expense relating to the gold and silver streaming agreements at Pueblo Viejo, and accretion, net of finance income. We expect net finance costs in 2020 to be lower year-over-year from $469 million in 2019 due in part to lower interest expense following debt repayments of $248 million in 2019. This is combined with the absence of non-cash interest expense related to the silver streaming agreement at Pascua-Lama. Our 2020 forecast includes the loss on debt extinguishment of $15 million related to the make-whole repurchase in January 2020 of $337 million of outstanding principal on our 3.85% Notes due 2022.

Capital Expenditures

Total attributable gold and copper capital expenditures for 2020 are expected to be in the range of $1,600 to $1,900 million. We continue to focus on the delivery of our project capital pipeline and we expect attributable project capital expenditures to be in the range of $300 to $400 million, consistent with 2019.

More than half of our attributable project capital expenditures in 2020 relate to advancing the expansion project at Pueblo Viejo, the third shaft project at Turquoise Ridge and construction of the Goldrush twin exploration declines. The remainder of project capital expenditure is mainly associated with the Zaldívar Chloride Leach Project and the restart of mining operations at Bulyanhulu.

Attributable minesite sustaining capital expenditures are expected to be in the range of $1,300 to $1,500 million compared to $1,176 million in 2019. The increase is primarily a result of increased capitalized stripping and underground development at Loulo-Gounkoto, the Phase 6 leach pad expansion at Veladero, tailings capacity expansion at Hemlo,

 

 

BARRICK YEAR-END 2019   45   MANAGEMENT’S DISCUSSION AND ANALYSIS


plant refurbishment at Bulyanhulu and the development of the Kalima-Ikamva pit project at Kibali.

Effective Income Tax Rate

At a gold price of $1,350/oz, our expected effective tax rate range for 2020 is between 30% to 35%. The rate is sensitive

to the relative proportion of sales in high versus low tax jurisdictions, realized gold and copper prices, the proportion of income from our equity accounted investments and the level of non-tax affected costs in countries where we generate net losses.

 

 

Outlook Assumptions and Economic Sensitivity Analysis

 

         
      2020 Guidance
Assumption
   Hypothetical Change    Impact on EBITDAa
(millions)
  

Impact on All-in
Sustaining  Costsa

Gold revenue, net of royalties

   $1,350/oz    +/- $100/oz    +/- $472    +/- $4/oz

Copper revenue, net of royalties

   $2.75/lb    +/- $0.50/lb    +/- $224    +/- $0.02/lb

 

  a.

EBITDA and all-in sustaining costs are non-GAAP financial performance measures with no standardized definition under IFRS. For further information and a detailed reconciliation, please see pages 91 to 112 of this MD&A.

Risks and Risk Management

 

Overview

The ability to deliver on our vision, strategic objectives and operating guidance depends on our ability to understand and appropriately respond to the uncertainties or “risks” we face that may prevent us from achieving our objectives. In order to achieve this we:

 

Maintain a framework that permits us to manage risk effectively and in a manner that creates the greatest value;

 

Integrate a process for managing risk into all our important decision-making processes so that we reduce the effect of uncertainty on achieving our objectives;

 

Actively monitor key controls we rely on to achieve the Company’s objectives so that they remain in place and are effective at all times; and

 

Provide assurance to senior management and relevant committees of the Board on the effectiveness of key control activities.

Board and Committee Oversight

We maintain strong risk oversight practices, with responsibilities outlined in the mandates of the Board and related committees. The Board’s mandate makes clear its responsibility for reviewing and discussing with management the processes used to assess and manage risk, including the identification by management of the principal risks of the business, and the implementation of appropriate systems to deal with such risks.

The Audit & Risk Committee of the Board of Directors assists the Board in overseeing the Company’s management of principal risks as well as the implementation of policies and standards for monitoring and modifying such risks, and monitoring and reviewing the Company’s financial position and financial risk management programs generally. The Corporate Governance & Nominating Committee assists the Board in overseeing the Company’s environmental, safety and health, corporate social responsibility, and human rights programs, policies and performance.

Management Oversight

Our weekly Executive Committee Review is the main forum for senior management to raise and discuss risks facing the operations and organization more broadly. At regularly scheduled meetings, the Board and the Audit & Risk Committee are provided with updates on the key issues identified by management at these weekly sessions.

Principal Risks

The following subsections describe some of our key sources of uncertainty and most important risk modification activities. The risks described below are not the only ones facing Barrick. Our business is subject to inherent risks in financial, regulatory, strategic and operational areas. For a more comprehensive discussion of those inherent risks, see “Risk Factors” in our most recent Form 40-F/Annual Information Form on file with the SEC and Canadian provincial securities regulatory authorities. Also see the “Cautionary Statement on Forward-Looking Information” on page 29 of this MD&A.

Financial position and liquidity

Our liquidity profile, level of indebtedness and credit ratings are all factors in our ability to meet short- and long-term financial demands. Barrick’s outstanding debt balances impact liquidity through scheduled interest and principal repayments and the results of leverage ratio calculations, which could influence our investment grade credit ratings and ability to access capital markets. In addition, our ability to draw on our credit facility is subject to meeting its covenants. Our primary source of liquidity is our operating cash flow, which is dependent on the ability of our operations to deliver projected future cash flows. The ability of our operations to deliver projected future cash flows, as well as future changes in gold and copper market prices, either favorable or unfavorable, will continue to have a material impact on our cash flow and liquidity.

Key risk modification activities:

 

Continued focus on generating positive free cash flow by improving the underlying cost structures of our operations in a sustainable manner;

 

Disciplined capital allocation criteria for all investments, to ensure a high degree of consistency and rigor is applied to all capital allocation decisions based on a comprehensive understanding of risk and reward;

 

Preparation of budgets and forecasts to understand the impact of different price scenarios on liquidity, and formulate appropriate strategies;

 

Reduced notional amount and lengthened average tenor of our outstanding debt through liability management activities; and

 

Other options available to the Company to enhance liquidity include drawing on our $3.0 billion undrawn credit facility, asset sales, joint ventures, or the issuance of debt or equity securities.

 

 

BARRICK YEAR-END 2019   46   MANAGEMENT’S DISCUSSION AND ANALYSIS


Improving free cash flow4 and costs

Our ability to improve productivity, drive down operating costs and reduce working capital remains a focus in 2020 and is subject to several sources of uncertainty. This includes our ability to achieve and maintain industry-leading margins by improving the productivity and efficiency of our operations through automation.

Key risk modification activities:

 

Formation of Nevada Gold Mines joint venture to drive free cash flow through synergies without issuing shares;

 

Weekly Executive Committee Review to assess and respond to risks in a timely manner;

 

General and administrative costs halved in 2019 relative to 2018 guidance despite increase in asset base; and

 

Implemented a flat, operationally focused, agile management structure with a tenet in ownership culture.

Social license to operate

At Barrick, we are committed to building, operating, and closing our mines in a safe and responsible manner. To do this, we seek to build trust-based partnerships with host governments and local communities to drive shared long-term value while working to minimize the social and environmental impacts of our activities. Geopolitical risks such as resource nationalism and incidents of corruption are inherent in the business of a company operating globally. Past environmental incidents in the extractive industry highlight the hazards (e.g., water management, tailings storage facilities, etc.) and the potential consequences to the environment, community health and safety. Our ability to maintain compliance with regulatory and community obligations in order to protect the environment and our host communities alike remains one of our top priorities. Barrick also recognizes climate change as an area of risk requiring specific focus.

Key risk modification activities:

 

Obtaining full ownership of Acacia and resuming day-to-day management of the Tanzanian assets;

 

Our commitment to responsible mining is supported by a robust governance framework, including a new overarching Sustainable Development Policy and refreshed policies in the areas of Biodiversity, Social Performance, Occupational Health and Safety, Environment and Human Rights;

 

We also updated our Code of Business Conduct and Ethics which sets out the ethical behavior expected of everyone working at, or with, Barrick;

 

We take a partnership approach with our home and host governments. This means we work to balance our own interests and priorities with those of our government partners, working to ensure that everyone derives real value from our operations;

 

We open our social and environmental performance to third-party scrutiny, including through the ISO 14001 re-certification process, International Cyanide Management Code audits, and annual human rights impact assessments; and

 

We continually review and update our closure plans and cost estimates to plan for environmentally responsible closure and monitoring of operations.

Resources and reserves and production outlook

Like any mining company, we face the risk that we are unable to discover or acquire new resources or that we do not convert resources into production. As we move into 2020 and beyond, our overriding objective of growing free cash flow per share continues to be underpinned by a strong pipeline of organic projects and minesite expansion opportunities in our core regions. Uncertainty related to these and other opportunities exists (potentially both favorable and unfavorable) due to the speculative nature of mineral exploration and development as well as the potential for increased costs, delays, suspensions and technical challenges associated with the construction of capital projects.

Key risk modification activities:

 

Focus on responsible mineral resource management, continuously improve ore body knowledge, and add to and upgrade reserves and resources;

 

Grow and invest in a portfolio of Tier One Gold Assets1,    Tier Two Gold Assets and Strategic Assets2 with an emphasis on organic growth; and

 

Invest in exploration across extensive land positions in many of the world’s most prolific gold districts.

Market Overview

The market prices of gold and, to a lesser extent, copper are the primary drivers of our profitability and our ability to generate free cash flow for our shareholders.

Gold

The price of gold is subject to volatile price movements over short periods of time and is affected by numerous industry and macroeconomic factors. During 2019, the gold price ranged from $1,266 per ounce to $1,557 per ounce. The average market price for the year of $1,393 per ounce represented an increase of 10% versus 2018.

Average Monthly Spot Gold Prices

(dollars per ounce)

 

LOGO

The price of gold rose significantly during the middle part of the year, reaching a six-year high in early September. During the year, the gold price was impacted by declining US dollar interest rates, global trade disputes and geopolitical tensions leading to increased investor interest.

Copper

During 2019, London Metal Exchange (“LME”) copper prices traded in a range of $2.50 to $3.00 per pound, averaged $2.72 per pound, and closed the year at $2.79 per pound. Copper prices are significantly influenced by physical demand from emerging markets, especially China.

Copper prices fell to the lows of the year in early September due to a strong US dollar, a weakening Chinese yuan, and concerns over global trade due to tariff actions before rising

 

 

BARRICK YEAR-END 2019   47   MANAGEMENT’S DISCUSSION AND ANALYSIS


into the end of the year on low global stockpile levels and an easing in trade tensions between the US and China.

Average Monthly Spot Copper Prices

(dollars per pound)

 

LOGO

We have provisionally priced copper sales for which final price determination versus the relevant copper index is outstanding at the balance sheet date. As at December 31, 2019, we recorded 39 million pounds of copper sales still subject to final price settlement at an average provisional price of $2.80 per pound. The impact to net income before taxation of a 10% movement in the market price of copper would be approximately $11 million, holding all other variables constant.

Currency Exchange Rates

The results of our mining operations outside of the United States are affected by US dollar exchange rates. We have exposure to the Argentine peso through operating costs at our Veladero mine, and peso denominated VAT receivable balances. In addition, we have exposure to the Canadian and Australian dollars, Chilean peso, Papua New Guinea kina, Peruvian sol, Zambian kwacha, Tanzanian shilling, Dominican peso, West African CFA franc, Euro, South African rand, and British pound through mine operating and capital costs.

Fluctuations in the US dollar increase the volatility of our costs reported in US dollars. In 2019, the Australian dollar traded in a range of $0.67 to $0.73 against the US dollar, while the US dollar against the Canadian dollar, Argentine peso, and CFA franc ranged from $1.30 to $1.37 and ARS 36.85 to ARS 62.00, and XOF 568 to XOF 664, respectively. During the year, the US dollar traded strongly. Along with inflation pressures in Argentina and government actions, this led to a continued weakening of the Argentine peso during the year. During 2019, we did not have any currency hedge positions, and are unhedged against foreign exchange exposures as at December 31, 2019 beyond spot requirements.

Fuel

For 2019, the price of West Texas Intermediate (“WTI”) crude oil traded in a wide range between $44 and $67 per barrel, with an average market price of $57 per barrel, and closed the year at $61 per barrel. Oil prices were impacted by global trade tensions, geopolitical events, and the US dollar.

Average Monthly Spot Crude Oil Price (WTI)

(dollars per barrel)

 

LOGO

During 2019, we did not have any fuel hedge positions, and are unhedged against fuel exposures as at December 31, 2019.

US Dollar Interest Rates

After four years of benchmark rate increases by the US Federal Reserve, the benchmark rate was lowered by 75 basis points over the course of 2019 to a range of 1.50% to 1.75% in an effort to keep the economy stable during a period of slowing growth and global trade uncertainty. Further changes to short-term rates in 2020 are expected to be dependent on economic data.

At present, our interest rate exposure mainly relates to interest income received on our cash balances ($3.3 billion at December 31, 2019); the mark-to-market value of derivative instruments; the carrying value of certain long-lived assets and liabilities; and the interest payments on our variable-rate debt ($0.1 billion at December 31, 2019). Currently, the amount of interest expense recorded in our consolidated statement of income is not materially impacted by changes in interest rates, because the majority of debt was issued at fixed interest rates. The relative amounts of variable-rate financial assets and liabilities may change in the future, depending on the amount of operating cash flow we generate, as well as the level of capital expenditures and our ability to borrow on favorable terms using fixed rate debt instruments. Changes in interest rates affect the accretion expense recorded on our provision for environmental rehabilitation and therefore would affect our net earnings.

 

 

BARRICK YEAR-END 2019   48   MANAGEMENT’S DISCUSSION AND ANALYSIS


Production and Cost Summary - Gold

(Unaudited)

 

     For the three months ended     For the years ended  
      12/31/2019      9/30/2019      % Change     12/31/2019      12/31/2018      % Change     12/31/2017  

Nevada Gold Mines (61.5%)a

                  

Gold produced (000s oz)

     585        535        9     2,218        2,368        (6 )%      2,523  

Cost of sales ($/oz)

     1,038        1,027        1     924        814        13     786  

Total cash costs ($/oz)b

     711        693        3     634        526        20     467  

All-in sustaining costs ($/oz)b

     944        946        0     828        664        25     634  

Cortez (61.5%)c

                  

Gold produced (000s oz)

     133        126        6     801        1,265        (37 )%      1,447  

Cost of sales ($/oz)

     945        829        14     762        659        16     657  

Total cash costs ($/oz)b

     681        570        19     515        351        47     300  

All-in sustaining costs ($/oz)b

     1,012        772        31     651        430        51     380  

Carlin (61.5%)d

                  

Gold produced (000s oz)

     276        278        (1 )%      968        835        16     780  

Cost of sales ($/oz)

     975        1,007        (3 )%      1,004        1,054        (5 )%      1,024  

Total cash costs ($/oz)b

     766        775        (1 )%      746        740        1     721  

All-in sustaining costs ($/oz)b

     965        1,014        (5 )%      984        983        0     1,045  

Turquoise Ridge (61.5%)e

                  

Gold produced (000s oz)

     111        82        35     335        268        25     211  

Cost of sales ($/oz)

     971        1,077        (10 )%      846        783        8     715  

Total cash costs ($/oz)b

     625        622        0     585        678        (14 )%      589  

All-in sustaining costs ($/oz)b

     800        840        (5 )%      732        756        (3 )%      733  

Phoenix (61.5%)f

                  

Gold produced (000s oz)

     31        25        24     56          

Cost of sales ($/oz)

     2,025        2,186        (7 )%      2,093          

Total cash costs ($/oz)b

     902        1,010        (11 )%      947          

All-in sustaining costs ($/oz)b

     1,034        1,622        (36 )%      1,282          

Long Canyon (61.5%)f

                  

Gold produced (000s oz)

     34        24        42     58          

Cost of sales ($/oz)

     1,026        1,170        (12 )%      1,088          

Total cash costs ($/oz)b

     317        353        (10 )%      333          

All-in sustaining costs ($/oz)b

     657        714        (8 )%      681                            

Pueblo Viejo (60%)

                  

Gold produced (000s oz)

     179        139        29     590        581        2     650  

Cost of sales ($/oz)

     660        807        (18 )%      747        750        0     699  

Total cash costs ($/oz)b

     422        504        (16 )%      471        465        1     405  

All-in sustaining costs ($/oz)b

     517        631        (18 )%      592        623        (5 )%      525  

Loulo-Gounkoto (80%)g

                  

Gold produced (000s oz)

     144        153        (6 )%      572          

Cost of sales ($/oz)

     1,037        1,018        2     1,044          

Total cash costs ($/oz)b

     631        630        0     634          

All-in sustaining costs ($/oz)b

     917        966        (5 )%      886                            

Kibali (45%)g

                  

Gold produced (000s oz)

     87        91        (4 )%      366          

Cost of sales ($/oz)

     1,205        1,187        2     1,111          

Total cash costs ($/oz)b

     608        554        10     568          

All-in sustaining costs ($/oz)b

     740        703        5     693                            

Kalgoorlie (50%)h

                  

Gold produced (000s oz)

     36        58        (38 )%      206        314        (34 )%      368  

Cost of sales ($/oz)

     1,127        1,037        9     1,062        899        18     806  

Total cash costs ($/oz)b

     940        856        10     873        732        19     642  

All-in sustaining costs ($/oz)b

     1,172        1,170        0     1,183        857        38     729  

Tongon (89.7%)g

                  

Gold produced (000s oz)

     61        62        (2 )%      245          

Cost of sales ($/oz)

     1,476        1,396        6     1,469          

Total cash costs ($/oz)b

     803        793        1     787          

All-in sustaining costs ($/oz)b

     867        869        0     844                            

 

BARRICK YEAR-END 2019   49   MANAGEMENT’S DISCUSSION AND ANALYSIS


Production and Cost Summary - Gold (continued)

 

(unaudited)    For the three months ended     For the years ended  
      12/31/2019      9/30/2019      % Change     12/31/19      12/31/18      % Change     12/31/2017  

Porgera (47.5%)

                  

Gold produced (000s oz)

     82        75        9     284        204        39     235  

Cost of sales ($/oz)

     909        1,024        (11 )%      994        996        0     944  

Total cash costs ($/oz)b

     757        868        (13 )%      838        796        5     781  

All-in sustaining costs ($/oz)b

     894        1,053        (15 )%      1,003        1,083        (7 )%      993  

Veladero (50%)i

                  

Gold produced (000s oz)

     71        58        22     274        278        (1 )%      432  

Cost of sales ($/oz)

     1,138        1,243        (8 )%      1,188        1,112        7     897  

Total cash costs ($/oz)b

     710        773        (8 )%      734        629        17     598  

All-in sustaining costs ($/oz)b

     1,142        1,142        0     1,105        1,154        (4 )%      987  

Hemlo

                  

Gold produced (000s oz)

     54        49        10     213        171        25     196  

Cost of sales ($/oz)

     1,632        1,083        51     1,137        1,157        (2 )%      986  

Total cash costs ($/oz)b

     1,091        953        14     904        1,046        (14 )%      841  

All-in sustaining costs ($/oz)b

     1,380        1,280        8     1,140        1,318        (14 )%      1,092  

North Maraj

                  

Gold produced (000s oz)

     103        29        255     251        215        17     207  

Cost of sales ($/oz)

     1,021        907        13     953        795        20     683  

Total cash costs ($/oz)b

     675        603        12     646        603        7     509  

All-in sustaining costs ($/oz)b

     830        850        (2 )%      802        830        (3 )%      773  

Buzwagij

                  

Gold produced (000s oz)

     28        18        56     83        93        (11 )%      172  

Cost of sales ($/oz)

     1,235        1,292        (4 )%      1,240        939        32     643  

Total cash costs ($/oz)b

     1,144        1,202        (5 )%      1,156        916        26     600  

All-in sustaining costs ($/oz)b

     1,169        1,220        (4 )%      1,178        947        24     632  

Bulyanhuluj

                  

Gold produced (000s oz)

     9        6        50     27        26        4     112  

Cost of sales ($/oz)

     1,293        1,288        0     1,207        1,231        (2 )%      1,309  

Total cash costs ($/oz)b

     752        729        3     676        650        4     848  

All-in sustaining costs ($/oz)b

     909        769        18     773        754        3     1,319  

Total Attributable to Barrickk

                  

Gold produced (000s oz)

     1,439        1,306        10     5,465        4,527        21     5,323  

Cost of sales ($/oz)l

     1,046        1,065        (2 )%      1,005        892        13     794  

Total cash costs ($/oz)b

     692        710        (3 )%      671        588        14     526  

All-in sustaining costs ($/oz)b

     923        984        (6 )%      894        806        11     750  

 

a.

Represents the combined results of Cortez, Goldstrike (including our 60% share of South Arturo) and our 75% interest in Turquoise Ridge until June 30, 2019. Commencing July 1, 2019, the date Nevada Gold Mines was established, the results represent our 61.5% interest in Cortez, Carlin (including Goldstrike and 60% of South Arturo), Turquoise Ridge (including Twin Creeks), Phoenix and Long Canyon.

b.

These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 91 to 112 of this MD&A.

c.

On July 1, 2019, Cortez was contributed to Nevada Gold Mines, a joint venture with Newmont. As a result, the amounts presented are on an 100% basis up until June 30, 2019, and on a 61.5% basis thereafter.

d.

On July 1, 2019, Barrick’s Goldstrike and Newmont’s Carlin were contributed to Nevada Gold Mines and are now referred to as Carlin. As a result, the amounts presented represent Goldstrike on a 100% basis (including our 60% share of South Arturo) up until June 30, 2019, and the combined results of Carlin and Goldstrike (including our 60% share of South Arturo) on a 61.5% basis thereafter.

e.

Barrick owned 75% of Turquoise Ridge through to the end of the second quarter of 2019, with our joint venture partner, Newmont, owning the remaining 25%. Turquoise Ridge was proportionately consolidated on the basis that the joint venture partners that have joint control have rights to the assets and obligations for the liabilities relating to the arrangement. The figures presented in this table are based on our 75% interest in Turquoise Ridge until June 30, 2019. On July 1, 2019, Barrick’s 75% interest in Turquoise Ridge and Newmont’s Twin Creeks and 25% interest in Turquoise Ridge were contributed to Nevada Gold Mines. Starting July 1, 2019, the results represent our 61.5% share of Turquoise Ridge and Twin Creeks, now referred to as Turquoise Ridge.

f.

These sites were acquired as a result of the formation of Nevada Gold Mines on July 1, 2019.

g.

These sites did not form a part of the Barrick consolidated results in 2018 and 2017 as these sites were acquired as a result of the Merger.

h.

On November 28, 2019, we completed the sale of our 50% interest in Kalgoorlie in Western Australia to Saracen Mineral Holdings Limited for total cash consideration of $750 million. Accordingly, these represent our 50% interest until November 28, 2019.

i.

On June 30, 2017, we sold 50% of Veladero; therefore, these represent results on a 100% basis from January 1 to June 30, 2017 and on a 50% basis from July 1, 2017 onwards.

j.

Formerly known as Acacia Mining plc. On September 17, 2019, Barrick acquired all of the shares of Acacia it did not own. Operating results are included at 100% from October 1, 2019 (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience) up until the GoT’s 16% free-carried interest is made effective, which is expected to be January 1, 2020, and on an 84% basis thereafter.

k.

With the end of mining at Golden Sunlight and Morila in the second quarter and Lagunas Norte in the third quarter as previously reported, we have ceased to include production or non-GAAP cost metrics for these sites from July 1, 2019 and October 1, 2019, respectively, onwards although these sites are included in the Total Attributable to Barrick in the prior period comparatives.

l.

Cost of sales per ounce (Barrick’s share) is calculated as cost of sales - gold on an attributable basis (excluding sites in care and maintenance) divided by gold equity ounces sold.

 

BARRICK YEAR-END 2019   50   MANAGEMENT’S DISCUSSION AND ANALYSIS


Production and Cost Summary - Copper

 

(unaudited)    For the three months ended     For the years ended  
      12/31/2019      9/30/2019      % Change     12/31/19      12/31/18      % Change     12/31/17  

Lumwana

                  

Copper production (millions lbs)

     63        65        (3 )%      238        224        6     256  

Cost of sales ($/lb)

     2.22        2.04        9     2.13        2.51        (15 )%      1.57  

C1 cash costs ($/lb)a

     2.10        1.83        15     1.79        2.08        (14 )%      1.66  

All-in sustaining costs ($/lb)a

     3.41        3.66        (7 )%      3.04        3.08        (1 )%      2.35  

Zaldívar (50%)

                  

Copper production (millions lbs)

     36        32        13     128        104        23     114  

Cost of sales ($/lb)

     2.59        2.18        19     2.46        2.55        (4 )%      2.15  

C1 cash costs ($/lb)a

     1.95        1.55        26     1.77        1.97        (10 )%      1.66  

All-in sustaining costs ($/lb)a

     2.56        1.91        34     2.15        2.47        (13 )%      2.21  

Jabal Sayid (50%)

                  

Copper production (millions lbs)

     18        15        20     66        55        20     43  

Cost of sales ($/lb)

     1.47        1.63        (10 )%      1.53        1.73        (12 )%      1.90  

C1 cash costs ($/lb)a

     1.29        1.42        (9 )%      1.26        1.53        (18 )%      1.70  

All-in sustaining costs ($/lb)a

     1.78        1.65        8     1.51        1.92        (21 )%      2.30  

Total Copper

                  

Copper production (millions lbs)

     117        112        4     432        383        13     413  

Cost of sales ($/lb)b

     2.26        2.00        13     2.14        2.40        (11 )%      1.77  

C1 cash costs ($/lb)a

     1.90        1.62        17     1.69        1.97        (14 )%      1.66  

All-in sustaining costs ($/lb)a

     2.82        2.58        9     2.52        2.82        (11 )%      2.34  

 

a.

These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 91 to 112 of this MD&A.

b.

Cost of sales per pound (Barrick’s share) is calculated as cost of sales - copper plus our equity share of cost of sales attributable to Zaldívar and Jabal Sayid divided by copper pounds sold.

OPERATING DIVISIONS PERFORMANCE

Review of Operating Divisions Performance

Following the Merger in the first quarter of 2019 and the events surrounding Nevada Gold Mines and Acacia in the third quarter of 2019 (refer to page 40 for further details), our presentation of reportable operating segments consists of nine gold mines (Cortez, Carlin, Turquoise Ridge, Pueblo Viejo, Loulo-Gounkoto, Kibali, Veladero, Porgera and North Mara). The remaining operating segments, including our remaining gold mines, copper mines and projects, have been

grouped into an “other” category and will not be reported on individually. Segment performance is evaluated based on a number of measures including operating income before tax, production levels and unit production costs. Certain costs are managed on a consolidated basis and are therefore not reflected in segment income.

 

 

BARRICK YEAR-END 2019   51   MANAGEMENT’S DISCUSSION AND ANALYSIS


Nevada Gold Mines (61.5% basis)a, Nevada USA

 

Summary of Operating and Financial Data    For the three months ended     For the years ended  
(unaudited)    12/31/19     9/30/19     % Change     12/31/19     12/31/18     % Change     12/31/17  

Total tonnes mined (000s)

     53,267       52,528       1     189,456       182,204       4     211,733  

Open pit ore

     9,316       7,706       21     26,942       20,605       31     17,530  

Open pit waste

     42,623       43,572       (2 )%      157,868       157,960       0     190,710  

Underground

     1,328       1,250       6     4,646       3,639       28     3,493  

Average grade (grams/tonne)

              

Open pit mined

     0.82       0.77       6     0.93       2.96       (69 )%      2.70  

Underground mined

     10.70       9.97       7     10.52       10.96       (4 )%      10.58  

Processed

     1.96       2.02       (3 )%      2.29       3.47       (34 )%      3.45  

Ore tonnes processed (000s)

     11,586       10,211       13     36,724       25,680       43     24,366  

Oxide mill

     3,044       3,124       (3 )%      8,338       4,527       84     4,562  

Roaster

     1,344       1,309       3     5,377       5,104       5     4,902  

Autoclave

     1,556       1,316       18     5,656       5,338       6     4,730  

Heap leach

     5,642       4,462       26     17,353       10,711       62     10,172  

Recovery rate

     80     79     1     82     83     (1 )%      86

Oxide Mill

     60     60     0     69     83     (17 )%      91

Roaster

     86     87     (1 )%      87     89     (3 )%      89

Autoclave

     74     79     (6 )%      74     69     8     62

Gold produced (000s oz)

     585       535       9     2,218       2,368       (6 )%      2,523  

Oxide mill

     76       76       0     336       590       (43 )%      957  

Roaster

     286       275       4     1,070       1,120       (4 )%      929  

Autoclave

     155       112       39     547       497       10     459  

Heap leach

     68       72       (6 )%      265       161       65     178  

Gold sold (000s oz)

     565       537       5     2,223       2,359       (6 )%      2,579  

Revenue ($ millions)

     861       804       7     3,128       2,986       5     3,241  

Cost of sales ($ millions)

     573       552       4     2,035       1,921       6     2,028  

Income ($ millions)

     277       237       17     1,050       1,011       4     1,169  

EBITDA ($ millions)b

     440       403       9     1,642       1,688       (3 )%      1,990  

EBITDA marginc

     51     50     2     52     57     (7 )%      61

Capital expenditures ($ millions)d,e

     145       164       (12 )%      627       626       0     620  

Minesite sustainingd

     124       110       13     380       272       40     392  

Projectd

     21       54       (61 )%      247       354       (30 )%      228  

Cost of sales ($/oz)

     1,038       1,027       1     924       814       13     786  

Total cash costs ($/oz)b

     711       693       3     634       526       20     467  

All-in sustaining costs ($/oz)b

     944       946       0     828       664       25     634  

All-in costs ($/oz)b

     982       1,048       (6 )%      938       814       15     726  

 

  a.

Represents the combined results of Cortez, Goldstrike (including our 60% share of South Arturo) and our 75% interest in Turquoise Ridge until June 30, 2019. Commencing July 1, 2019, the date Nevada Gold Mines was established, the results represent our 61.5% interest in Cortez, Carlin (including Goldstrike and 60% of South Arturo), Turquoise Ridge (including Twin Creeks), Phoenix and Long Canyon.

  b.

These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 91 to 112 of this MD&A.

  c.

Represents EBITDA divided by revenue.

  d.

Presented on a cash basis as a result of adopting IFRS 16 Leases starting in the first quarter of 2019. Capital expenditures for 2018 and 2017 are presented on an accrued basis. Please refer to page 27 of this MD&A for more details.

  e.

Amounts presented exclude capitalized interest.

As discussed on page 40, on July 1, 2019, Nevada Gold Mines was established which encompasses Barrick’s former Cortez, Goldstrike, Turquoise Ridge and Goldrush properties and Newmont’s former Carlin, Twin Creeks, Phoenix, Long Canyon and Lone Tree properties. Barrick is the operator of the joint venture and owns 61.5%, with Newmont owning the remaining 38.5% of the joint venture. Refer to the following pages for a detailed discussion of Cortez, Carlin (including Goldstrike) and Turquoise Ridge (including Twin Creeks) results.

 

BARRICK YEAR-END 2019   52   MANAGEMENT’S DISCUSSION AND ANALYSIS


Carlin (61.5% basis)a, Nevada USA

 

Summary of Operating and Financial Data    For the three months ended     For the years ended  
(unaudited)    12/31/19     9/30/19     % Change     12/31/19     12/31/18     % Change     12/31/17  

Total tonnes mined (000s)

     13,639       11,584       18  %      49,343       59,605       (17 )%      76,587  

Open pit ore

     1,832       1,627       13  %      4,773       4,626       3  %      1,575  

Open pit waste

     10,966       9,145       20  %      41,978       53,387       (21 )%      73,374  

Underground

     841       812       4  %      2,592       1,592       63  %      1,638  

Average grade (grams/tonne)

              

Open pit mined

     1.84       1.44       28  %      2.08       3.75       (44 )%      3.56  

Underground mined

     9.40       8.61       9  %      9.09       9.39       (3 )%      8.88  

Processed

     3.65       3.33       10  %      3.80       4.32       (12 )%      4.20  

Ore tonnes processed (000s)

     3,156       3,188       (1 )%      10,467       8,075       30  %      8,041  

Oxide mill

     705       663       6  %      1,368       n/a       n/a       n/a  

Roaster

     991       980       1  %      3,627       3,341       9  %      3,783  

Autoclave

     892       810       10  %      4,169       4,734       n/a       4,258  

Heap leach

     568       735       (23 )%      1,303       n/a       n/a       n/a  

Recovery rate

     75     76     (1 )%      75     74     1  %      77

Roaster

     86     87     (1 )%      86     89     (2 )%      88

Autoclave

     58     63     (9 )%      59     53     12  %      62

Gold produced (000s oz)

     276       278       (1 )%      968       835       16  %      780  

Oxide mill

     11       14       (21 )%      25       n/a       n/a       n/a  

Roaster

     205       213       (4 )%      694       606       15  %      531  

Autoclave

     49       38       29  %      225       229       (2 )%      248  

Heap leach

     11       13       (15 )%      24       n/a       n/a       n/a  

Gold sold (000s oz)

     275       272       1  %      967       842       15  %      868  

Revenue ($ millions)

     408       401       2  %      1,355       1,066       27  %      1,091  

Cost of sales ($ millions)

     268       274       (2 )%      971       886       10  %      889  

Income ($ millions)

     133       121       10  %      370       166       123  %      186  

EBITDA ($ millions)b

     191       183       5  %      609       428       42  %      446  

EBITDA marginc

     47     46     3  %      45     40     12  %      41

Capital expenditures ($ millions)d,e

     51       56       (9 )%      211       186       13  %      263  

Minesite sustainingd

     51       56       (9 )%      211       186       13  %      263  

Projectd

     0       0       0  %      0       0       0  %      0  

Cost of sales ($/oz)

     975       1,007       (3 )%      1,004       1,054       (5 )%      1,024  

Total cash costs ($/oz)b

     766       775       (1 )%      746       740       1  %      721  

All-in sustaining costs ($/oz)b

     965       1,014       (5 )%      984       983       0  %      1,045  

All-in costs ($/oz)b

     965       1,014       (5 )%      984       983       0  %      1,045  

 

  a.

On July 1, 2019, Barrick’s Goldstrike operations and Newmont’s Carlin operations were contributed to Nevada Gold Mines and are now collectively referred to as Carlin. As a result, the amounts presented represent Goldstrike on a 100% basis (including our 60% share of South Arturo) up until June 30, 2019, and the combined results of Carlin and Goldstrike (including our 60% share of South Arturo) on a 61.5% basis thereafter.

  b.

These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 91 to 112 of this MD&A.

  c.

Represents EBITDA divided by revenue.

  d.

Presented on a cash basis as a result of adopting IFRS 16 Leases starting in the first quarter of 2019. Capital expenditures for 2018 and 2017 are presented on an accrued basis. Please refer to page 27 of this MD&A for more details.

  e.

Amounts presented exclude capitalized interest.

 

On July 1, 2019, Barrick’s Goldstrike operations and Newmont’s Carlin operations were contributed to Nevada Gold Mines and are now collectively referred to as Carlin. As a result, the amounts presented represent Goldstrike on a 100% basis (including our 60% share of South Arturo) up until June 30, 2019, and the combined results of Carlin and Goldstrike (including our 60% share of South Arturo) on a 61.5% basis thereafter. As a result of this transaction, there is now a higher proportion of open pit ore mined and, consequently, the average grade processed is lower, which

also aligns with the inclusion of a heap leach facility contributed by Newmont.

Safety and Environment

Three LTIs were recorded during the quarter (at Goldstrike surface and Carlin) with an LTIFR of 1.27 per million hours worked versus 2.05 the previous quarter. Goldstrike underground reported zero LTIs during the fourth quarter. No Class 1 environmental incidents occurred during the quarter.

 

 

BARRICK YEAR-END 2019   53   MANAGEMENT’S DISCUSSION AND ANALYSIS


Financial Results

Q4 2019 compared to Q3 2019

Carlin’s income for the fourth quarter of 2019 increased by 10% primarily due to lower cost of sales per ounce5 and higher sales volumes resulting from higher grade ore mined and processed.

Gold production in the fourth quarter of 2019 was 1% lower compared to the prior quarter, mainly due to lower production from the roasters and oxide mill offset by higher autoclave production. The higher autoclave production is a result of higher throughput from processing Carlin stockpiles from Pete open pit, a synergy unlocked by the creation of Nevada Gold Mines.

Cost of sales per ounce5 and total cash costs per ounce4 in the fourth quarter of 2019 were 3% and 1% lower, respectively, than the prior quarter mainly due to a higher proportion of lower cost underground production in the feed mix. In the fourth quarter of 2019, all-in sustaining costs per ounce4 decreased by 5% compared to the prior quarter primarily due to lower minesite sustaining capital expenditures.

Capital expenditures in the fourth quarter of 2019 were 9% lower than the prior quarter due to lower underground development and equipment purchases, lower maintenance component replacements for the open pit and the completion of the autoclave brick re-line in the third quarter. Capital drilling also decreased due to the completion of drilling programs for the winter season.

2019 compared to 2018

Carlin’s income for 2019 reflects our 61.5% interest in Nevada Gold Mines and is inclusive of income from Newmont’s former Carlin operations and the Goldstrike operations from July 1, 2019. Income for Carlin for the first six months of 2019 and the twelve months of 2018 represents Barrick’s 100% interest in the Goldstrike operations (including the 60% interest in South Arturo) prior to the formation of Nevada Gold Mines. This was the primary driver of the 123% increase in Carlin’s income compared to 2018.

Income and EBITDA4,a

(unaudited)

 

LOGO

a The results represent Goldstrike on a 100% basis (including our 60% share of South Arturo) from January 1, 2017 to June 30, 2019 and on the combined results of Carlin and Goldstrike (including our 60% share of South Arturo) on a 61.5% basis from July 1, 2019 onwards.

Gold production for 2019 was 16% higher compared to the prior year, primarily due to the inclusion of Newmont’s former Carlin operations from July 1, 2019. Production in the first six months of 2019 was also higher due to scheduled roaster maintenance at Goldstrike in the first six months of 2018. This was partially offset by the reduction in Barrick’s interest in Goldstrike (including the 60% interest in South Arturo) from 100% to 61.5% from July 1, 2019.

Productiona

(000s ounces)

 

LOGO

a The results represent Goldstrike (including our 60% share of South Arturo) on a 100% basis from January 1, 2018 to June 30, 2019 and the combined results of Carlin and Goldstrike (including our 60% share of South Arturo) on a 61.5% basis from July 1, 2019 onwards.

Cost of sales per ounce5 was 5% lower than the prior year due to lower depreciation expense on a per ounce basis. Total cash costs per ounce4 and all-in sustaining costs per ounce4 were in line with the prior year.

Cost of Sales5, Total Cash Costs4 and AISC4

($ per ounce) (unaudited)

 

LOGO

Capital expenditures for 2019 increased by 13% from the same prior year period due to higher minesite sustaining capital expenditures. Higher minesite sustaining capital expenditures are attributed to the inclusion of Newmont’s former Carlin operations, partially offset by the reduction in Barrick’s interest in Goldstrike (including the 60% interest in South Arturo) from 100% to 61.5% from July 1, 2019.

2019 compared to Outlook

Gold production for 2019 of 968 thousand ounces was within the guidance range of 960 to 1,020 thousand ounces. Cost of sales per ounce5 of $1,004 was lower than the guidance range of $1,020 to $1,080 per ounce. Total cash costs per ounce4 and all-in sustaining costs per ounce4 of $746 and $984, respectively, were within the guidance ranges of $740 to $790 per ounce, and $955 to $995 per ounce, respectively.

 

 

BARRICK YEAR-END 2019   54   MANAGEMENT’S DISCUSSION AND ANALYSIS


Cortez (61.5% basis)a, Nevada USA

 

Summary of Operating and Financial Data    For the three months ended     For the years ended  
(unaudited)    12/31/19     9/30/19     % Change     12/31/19     12/31/18     % Change     12/31/17  

Total tonnes mined (000s)

     23,422       23,357       0  %      105,949       121,929       (13 )%      134,503  

Open pit ore

     3,876       2,158       80  %      14,640       15,979       (8 )%      15,955  

Open pit waste

     19,275       20,948       (8 )%      90,029       104,573       (14 )%      117,336  

Underground

     271       251       8  %      1,280       1,377       (7 )%      1,212  

Average grade (grams/tonne)

              

Open pit mined

     0.45       0.42       7  %      0.67       2.73       (75 )%      2.65  

Underground mined

     11.58       11.41       2  %      10.66       10.73       (1 )%      13.28  

Processed

     1.29       1.54       (16 )%      1.60       2.67       (40 )%      3.10  

Ore tonnes processed (000s)

     4,259       2,837       50  %      17,583       17,001       3  %      15,853  

Oxide mill

     638       654       (2 )%      3,462       4,527       (24 )%      4,562  

Roaster

     353       329       7  %      1,750       1,763       (1 )%      1,119  

Heap leach

     3,268       1,854       76  %      12,371       10,711       15  %      10,172  

Recovery rate

     75     84     (10 )%      86     87     (1 )%      92

Oxide Mill

     69     79     (13 )%      78     83     (6 )%      91

Roaster

     86     86     0  %      87     91     (4 )%      91

Gold produced (000s oz)

     133       126       6  %      801       1,265       (37 )%      1,447  

Oxide mill

     35       34       3  %      253       590       (57 )%      956  

Roaster

     81       62       31  %      376       514       (27 )%      312  

Heap leach

     17       30       (43 )%      172       161       7  %      178  

Gold sold (000s oz)

     132       126       5  %      798       1,255       (36 )%      1,489  

Revenue ($ millions)

     194       185       5  %      1,086       1,589       (32 )%      1,870  

Cost of sales ($ millions)

     124       105       19  %      608       828       (27 )%      979  

Income ($ millions)

     69       77       (10 )%      459       726       (37 )%      873  

EBITDA ($ millions)b

     105       109       (4 )%      656       1,112       (41 )%      1,405  

EBITDA marginc

     54     59     (9 )%      60     70     (14 )%      75

Capital expenditures ($ millions)d,e

     43       53       (19 )%      255       340       (25 )%      294  

Minesite sustainingd

     40       22       80  %      90       65       38  %      96  

Projectd

     3       31       (89 )%      165       275       (40 )%      198  

Cost of sales ($/oz)

     945       829       14  %      762       659       16  %      657  

Total cash costs ($/oz)b

     681       570       19  %      515       351       47  %      300  

All-in sustaining costs ($/oz)b

     1,012       772       31  %      651       430       51  %      380  

All-in costs ($/oz)b

     1,039       1,020       2  %      854       649       31  %      512  

 

  a.

On July 1, 2019, Cortez was contributed to Nevada Gold Mines, a joint venture with Newmont. As a result, the amounts presented are on a 100% basis up until June 30, 2019, and on a 61.5% basis thereafter.

  b.

These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 91 to 112 of this MD&A.

  c.

Represents EBITDA divided by revenue.

  d.

Presented on a cash basis as a result of adopting IFRS 16 Leases starting in the first quarter of 2019. Capital expenditures for 2018 and 2017 are presented on an accrued basis. Please refer to page 27 of this MD&A for more details.

  e.

Amounts presented exclude capitalized interest.

 

On July 1, 2019, Barrick’s Cortez operations were contributed to Nevada Gold Mines, a joint venture with Newmont. As a result, the amounts presented represent Cortez on a 100% basis up until June 30, 2019 and on a 61.5% basis thereafter.

Safety and Environment

There were no LTIs at Cortez during the quarter which resulted in an LTIFR of zero per million hours, which is consistent with the prior quarter. No Class 1 environmental incidents occurred during the quarter.

Financial Results

Q4 2019 compared to Q3 2019

Cortez’s income for the fourth quarter of 2019 was 10% lower than the prior quarter primarily due to higher cost of sales per ounce5, partially offset by higher sales volume resulting from higher gold production.

Gold production in the fourth quarter of 2019 was 6% higher compared to the prior quarter, primarily due to increased underground ore mined and then processed at the Carlin Roasters combined with higher recoveries, partially offset by lower heap leach production. The routing of Cortez underground ore through Mill 6 at Carlin was a synergy unlocked by the creation of Nevada Gold Mines.

 

 

BARRICK YEAR-END 2019   55   MANAGEMENT’S DISCUSSION AND ANALYSIS


Cost of sales per ounce5 and total cash costs per ounce4 in the fourth quarter of 2019 were 14% and 19% higher, respectively, versus the prior quarter primarily due to sales mix and ore routing. In the third quarter of 2019, the remaining higher grade, low-cost stockpiles from the Cortez Hills Open Pit (“CHOP”) were processed. In the fourth quarter of 2019, all-in sustaining costs per ounce4 increased by 31% compared to the prior quarter due to higher cash costs per ounce4 together with higher minesite sustaining capital expenditure.

Capital expenditures in the fourth quarter of 2019 decreased by 19% compared to the prior quarter due to lower project capital expenditures, partially offset by higher minesite sustaining capital expenditures. The lower project capital expenditures relative to the third quarter of 2019 were due to decreases at the Cortez Hills Underground Rangefront project and the change in classification of the Crossroads open pit project from project to sustaining capital. At the Rangefront project, the contractor was removed from site in the fourth quarter due to sub-standard work and safety performance and we are in the process of finding a replacement. The Crossroads open pit project transitioned to production status late in the third quarter from pre-production in the second quarter. Accordingly, higher minesite sustaining capital expenditures relative to the third quarter of 2019 is attributed to this transition.

2019 compared to 2018

Cortez’s income for 2019 reflects our 61.5% interest following the formation of Nevada Gold Mines as described above. Income for Cortez for the same prior year period represents Barrick’s 100% share of the Cortez operations. In addition to this impact, Cortez’s income was impacted by a decrease in sales volume reflecting lower gold production and higher cost of sales per ounce5 partially offset by the higher realized gold price4.

Income and EBITDA4,a

(unaudited)

 

LOGO

a The results are on a 100% basis from January 1, 2017 to June 30, 2019 and on a 61.5% basis from July 1, 2019 onwards.

Gold production for 2019 was 37% lower, primarily due to the reduction in Barrick’s interest in Cortez from July 1, 2019 combined with lower grades mined and processed from CHOP as mining was completed in the second quarter of 2019. This was partially offset by higher leach production, and a reduction of gold in circuit. Leach production has increased as mining and placement from Crossroads ramped up in the current year and additional tonnes were placed under solution. The lower gold in circuit balances were also related to the completion of mining at CHOP as the high-grade CHOP ore in circuit was drawn down by the end of the second quarter of 2019.

Productiona

(000s ounces)

 

LOGO

a The results are on a 100% basis from January 1, 2017 to June 30, 2019 and on a 61.5% basis from July 1, 2019 onwards.

Cost of sales per ounce5 for 2019 increased by 16%, due to higher total cash costs per ounce4 offset slightly by lower depreciation expense as mined ounce production has dropped significantly with the transition away from mining predominantly ore in the CHOP pit to waste stripping at Crossroads. Total cash costs per ounce4 was 47% higher than the prior year due to lower grades as mining from CHOP was completed in the second quarter of 2019 combined with increased royalty costs and higher tonnes hauled. Royalties have increased as production shifts from CHOP to Crossroads, which carries a higher royalty rate. For 2019, all-in sustaining costs per ounce4 increased by 51% compared to 2018, due to higher total cash costs per ounce4 and increased sustaining capital expenditures.

Cost of Sales5, Total Cash Costs4 and AISC4

($ per ounce) (unaudited)

 

LOGO

Capital expenditures for 2019 were 25% lower than the prior year due to the reduction in Barrick’s interest in Cortez from 100% to 61.5% from July 1, 2019. In addition to this, the lower project capital expenditures were due to decreasing Crossroads dewatering activities and Rangefront project expenditures. Sustaining capital increased over the prior year due to Area 30 leach pad expansion work.

2019 compared to Outlook

Gold production for 2019 of 801 thousand ounces was at the high end of the guidance range of 760 to 810 thousand ounces. Cost of sales per ounce5 for 2019 was $762, which was lower than the guidance range of $810 to $850 per ounce. Total cash costs per ounce4 and all-in sustaining costs per ounce4 of $515 and $651, respectively, also came in better than guidance, with ranges of $530 to $580 per ounce and $670 to $710 per ounce, respectively.

 

 

BARRICK YEAR-END 2019   56   MANAGEMENT’S DISCUSSION AND ANALYSIS


Turquoise Ridge (61.5%)a, Nevada USA

 

Summary of Operating and Financial Data    For the three months ended     For the years ended  
(unaudited)    12/31/19     9/30/19     % Change     12/31/19     12/31/18     % Change     12/31/17  

Total tonnes mined (000s)

     3,819       4,811       (21 )%      9,001       670       1,243  %      643  

Open pit ore

     608       732       (17 )%      1,340       n/a       n/a       n/a  

Open pit waste

     2,995       3,892       (23 )%      6,887       n/a       n/a       n/a  

Underground

     216       187       16  %      774       670       16  %      643  

Average grade (grams/tonne)

              

Open pit mined

     1.80       1.01       78  %      1.37       n/a       n/a       n/a  

Underground mined

     14.09       13.28       6  %      14.44       15.00       (4 )%      15.45  

Processed

     4.28       3.78       13  %      5.62       14.79       (62 )%      15.01  

Ore tonnes processed (000s)

     934       950       (2 )%      2,201       604       264  %      472  

Oxide Mill

     114       107       6  %      221       n/a       n/a       n/a  

Autoclave

     660       506       30  %      1,483       604       146  %      472  

Heap leach

     160       337       (53 )%      497       n/a       n/a       n/a  

Recovery Rate

     86     89     (3 )%      89     93     (4 )%      92

Oxide Mill

     87     87     0  %      87     n/a       n/a       n/a  

Autoclave

     86     89     (3 )%      89     93     (4 )%      92

Gold produced (000s oz)

     111       82       35  %      335       268       25  %      211  

Oxide Mill

     3       5       (40 )%      8       n/a       n/a       n/a  

Autoclave

     105       74       42  %      321       268       20  %      211  

Heap leach

     3       3       (11 )%      6       n/a       n/a       n/a  

Gold sold (000s oz)

     99       96       3  %      356       262       36  %      222  

Revenue ($ millions)

     152       142       7  %      504       331       52  %      280  

Cost of sales ($ millions)

     95       103       (8 )%      300       206       46  %      159  

Income ($ millions)

     56       38       47  %      201       126       59  %      119  

EBITDA ($ millions)b

     90       81       12  %      293       154       90  %      147  

EBITDA marginc

     59     57     4  %      58     47     25  %      53

Capital expenditures ($ millions)d

     24       26       (7 )%      85       62       37  %      36  

Minesite sustainingd

     18       18       1  %      50       20       149  %      32  

Projectd

     6       8       (25 )%      35       42       (17 )%      4  

Cost of sales ($/oz)

     971       1,077       (10 )%      846       783       8  %      715  

Total cash costs ($/oz)b

     625       622       0  %      585       678       (14 )%      589  

All-in sustaining costs ($/oz)b

     800       840       (5 )%      732       756       (3 )%      733  

All-in costs ($/oz)b

     863       927       (7 )%      834       916       (9 )%      753  

 

  a.

Prior to July 1, 2019, Barrick owned 75% of Turquoise Ridge with our joint venture partner, Newmont, owning the remaining 25%. Turquoise Ridge was proportionately consolidated on the basis that the joint venture partners that have joint control have rights to the assets and obligations for the liabilities relating to the arrangement. The figures presented in this table are based on our 75% interest in Turquoise Ridge until June 30, 2019. On July 1, 2019, Barrick’s 75% interest in Turquoise Ridge and Newmont’s 100% interest in Twin Creeks and 25% interest in Turquoise Ridge were contributed to Nevada Gold Mines. Starting July 1, 2019, the results represent our 61.5% share of Turquoise Ridge and Twin Creeks, now collectively referred to as Turquoise Ridge.

  b.

These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 91 to 112 of this MD&A.

  c.

Represents EBITDA divided by revenue.

  d.

Presented on a cash basis as a result of adopting IFRS 16 Leases starting in the first quarter of 2019. Capital expenditures for 2018 and 2017 are presented on an accrued basis. Please refer to page 27 of this MD&A for more details.

 

Barrick owned 75% of Turquoise Ridge through to the end of the second quarter of 2019, with our joint venture partner, Newmont, owning the remaining 25%. The figures presented in this table are based on our 75% interest in Turquoise Ridge until June 30, 2019. On July 1, 2019, Barrick’s 75% interest in Turquoise Ridge and Newmont’s Twin Creeks and 25% interest in Turquoise Ridge were contributed to Nevada Gold Mines. Starting July 1, 2019, our results represent our 61.5% share of Turquoise Ridge and Twin Creeks, now referred to as Turquoise Ridge. As a result of this transaction, from July 1, 2019, Turquoise Ridge includes the Twin Creeks open pit operations resulting in considerably higher tonnes mined at

a lower average grade of ore processed. It also includes the Twin Creeks processing operations and heap leach facility contributed by Newmont.

Safety and Environment

There were two LTIs during the quarter, which resulted in an LTIFR of 2.57 per million hours worked versus 1.41 the previous quarter. Site leadership teams continue to focus their field engagements to reinforce safe work requirements and reduce hand injury occurrences. No Class 1 environmental incidents occurred during the quarter.

 

 

BARRICK YEAR-END 2019   57   MANAGEMENT’S DISCUSSION AND ANALYSIS


Financial Results

Q4 2019 compared to Q3 2019

Turquoise Ridge’s income for the fourth quarter of 2019 increased by 47% mainly due to lower cost of sales per ounce5 in conjunction with higher sales volumes reflecting higher production.

Gold production in the fourth quarter of 2019 was 35% higher than the prior quarter, primarily due to increased autoclave throughput in addition to the processing of higher grade ore. The higher autoclave throughput is due to higher availability following a planned shutdown in the prior quarter.

Cost of sales per ounce5 in the fourth quarter of 2019 was 10% lower than the prior quarter. Inventory that was subject to a positive remeasurement to fair value upon the formation of Nevada Gold Mines on July 1, 2019 was largely sold and reflected in cost of sales for the third quarter of 2019.

Total cash costs per ounce4 was in line with the prior quarter. All-in sustaining costs per ounce4 decreased by 5% compared to the prior quarter primarily reflecting lower minesite sustaining capital expenditures on a per ounce sold basis.

Capital expenditures in the fourth quarter of 2019 decreased by 7% compared to the prior quarter primarily due to lower project spend on the Third Shaft project.

2019 compared to 2018

Turquoise Ridge’s income for 2019 reflects our 61.5% interest in Nevada Gold Mines and is inclusive of income from Newmont’s former Twin Creeks operations and the Turquoise Ridge operations from July 1, 2019. Income for Turquoise Ridge for the first six months of 2019 and the twelve months of 2018 represents Barrick’s 75% interest in the Turquoise Ridge operations prior to the formation of Nevada Gold Mines. Consequently, this was the primary driver of the 59% increase in Turquoise Ridge’s income compared to 2018.

Income and EBITDA4,a

(unaudited)

 

LOGO

a The results represent Turquoise Ridge on a 75% basis from January 1, 2017 to June 30, 2019 and the combined results of Turquoise Ridge and Twin Creeks on a 61.5% basis from July 1, 2019 onwards.

Gold production for 2019 was 25% higher compared to the prior year, primarily due to the inclusion of Newmont’s former Twin Creeks operations from July 1, 2019. Production was also higher in the first six months of 2019 relative to the first six months of 2018 due to higher ore tonnes mined at better grades. This was partially offset by the reduction in Barrick’s

interest in the Turquoise Ridge operations from 75% to 61.5% from July 1, 2019.

Productiona

(000s ounces)

 

LOGO

a The results represent Turquoise Ridge on a 75% basis from January 1, 2017 to June 30, 2019 and the combined results of Turquoise Ridge and Twin Creeks on a 61.5% basis from July 1, 2019 onwards.

Cost of sales per ounce5 in 2019 was 8% per ounce higher than the prior year mainly reflecting an increase in depreciation resulting from the restatement of assets to fair value on the formation of Nevada Gold Mines as explained above. Total cash costs per ounce4 was 14% lower than the prior year due to more high-grade underground ore being processed and the elimination of the Toll Milling Agreement as a result of the formation of Nevada Gold Mines. In 2019, all-in sustaining costs per ounce4 decreased by 3% compared to the prior year due to lower total cash costs per ounce4.

Cost of Sales5, Total Cash Costs4 and AISC4

($ per ounce) (unaudited)

 

LOGO

In 2019, capital expenditures increased by 37% compared to the prior year. The increase was due to higher minesite sustaining capital as a result of combining Turquoise Ridge with Twin Creeks, offset by lower project capital spend for the Third Shaft project.

2019 compared to Outlook

Gold production in 2019 of 335 thousand ounces was within the guidance range of 330 to 370 thousand ounces. Cost of sales per ounce5 and total cash costs per ounce4 of $846 and $585, respectively, were also within the guidance ranges of $800 to $850 per ounce and $550 to $600 per ounce, respectively. All-in sustaining costs per ounce4 of $732 was slightly over the guidance range of $680 to $730 per ounce.

 

 

BARRICK YEAR-END 2019   58   MANAGEMENT’S DISCUSSION AND ANALYSIS


Other Nevada Gold Mines

 

Summary of Operating and Financial Data              For the three months ended  
(unaudited)    12/31/19      9/30/19  
      Gold
produced
(000s oz)
     Cost of
sales
($/oz)
    

Total
cash
costs

($/oz)a

     All-in
sustaining
costs
($/oz)a
     Capital
Expend-
ituresb
     Gold
produced
(000s oz)
     Cost of
sales
($/oz)
    

Total
cash
costs

($/oz)a

    

All-in
sustaining
costs

($/oz)a

     Capital
Expend-
ituresb
 

Phoenix (61.5%)c

     31        2,025        902        1,034        5        25        2,186        1,010        1,622        9  

Long Canyon (61.5%)c

     34        1,026        317        657        10        24        1,170        353        714        6  

 

  a.

These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 91 to 112 of this MD&A.

  b.

Includes both minesite sustaining and project capital expenditures.

  c.

These sites were acquired as a result of the formation of Nevada Gold Mines on July 1, 2019.

 

Phoenix (61.5%)

Gold production in the fourth quarter of 2019 for Phoenix was 24% higher compared to the prior quarter, primarily due to a more optimized ore blend leading to better mill recoveries. Cost of sales per ounce5 in the fourth quarter of 2019 was 7% lower than the prior quarter due to an improvement in production and sales. Third quarter attributable sales were impacted by the timing of the first gold concentrate sale following the formation of Nevada Gold Mines. In the fourth quarter of 2019, all-in sustaining costs per ounce4 decreased by 36% compared to the prior quarter primarily due to the increase in ounces sold and higher copper by-product credits offset slightly by increased sustaining capital expenditures. Sustaining capital expenditures decreased in the fourth quarter of 2019 due to timing of the tailings damn construction.

Compared to our outlook, gold production of 56 thousand ounces in 2019 was within the guidance range of 50 to 70 thousand ounces. Cost of sales per ounce5 of $2,093 was better than the guidance range of $2,250 to $2,300 per ounce. Total cash costs per ounce4 of $947 was at the lower end of the guidance range of $940 to $990 per ounce, while all-in sustaining costs per ounce4of $1,282 was above the guidance range of $1,120 to $1,150 per ounce.

 

Long Canyon (61.5%)

Gold production for Long Canyon in the fourth quarter of 2019 was 42% higher compared to the third quarter of 2019, primarily due to additional cells placed under leach, leading to improved recoveries. Cost of sales per ounce5 in the fourth quarter of 2019 was 12% lower than the prior quarter, mainly due to higher ounces sold driven by higher production. All-in sustaining costs per ounce4 decreased by 8% compared to the prior quarter, primarily due to higher production and sales driving lower total cash costs per ounce4 offset slightly by increased sustaining capital expenditures. Sustaining capital expenditures increased in the fourth quarter due to an increase in capitalized waste mined from Cut 7 of the open pit. Permitting for the open pit and underground expansions at Long Canyon is underway, though currently only the open pit is included in the life of mine plan.

Gold production in 2019 of 58 thousand ounces was above the guidance range of 40 to 50 thousand ounces. Cost of sales per ounce5 of $1,088 was better than the guidance range of $1,100 to $1,150 per ounce. Total cash costs per ounce4 of $333 was within the guidance range of $300 to $350 per ounce, while all-in sustaining costs per ounce4 of $681 was significantly better than the guidance range of $920 to $950 per ounce.

 

 

BARRICK YEAR-END 2019   59   MANAGEMENT’S DISCUSSION AND ANALYSIS


Pueblo Viejo (60% basis)a, Dominican Republic

 

Summary of Operating and Financial Data    For the three months ended     For the years ended  
(unaudited)    12/31/19     9/30/19     % Change     12/31/19     12/31/18     % Change     12/31/17  

Open pit tonnes mined (000s)

     5,729       5,817       (2 )%      24,732       24,063       3  %      23,430  

Open pit ore

     3,083       1,767       74  %      8,085       9,418       (14 )%      13,514  

Open pit waste

     2,646       4,050       (35 )%      16,647       14,645       14  %      9,916  

Average grade (grams/tonne)

              

Open pit waste

     2.92       2.98       (2 )%      2.76       2.78       (1 )%      3.07  

Processed

     4.20       4.05       4  %      3.91       4.04       (3 )%      4.57  

Autoclave ore tonnes processed (000s)

     1,464       1,182       24  %      5,164       5,008       3  %      4,791  

Recovery Rate

     89     90     (1 )%      89     89     0  %      92

Gold produced (000s oz)

     179       139       29  %      590       581       2  %      650  

Gold sold (000s oz)

     174       136       28  %      584       590       (1 )%      637  

Revenue ($ millions)

     240       213       13     843       798       6  %      850  

Cost of sales ($ millions)

     114       109       5     435       443       (2 )%      445  

Income ($ millions)

     125       104       20     402       342       18  %      395  

EBITDA ($ millions)b

     159       133       20     522       457       14  %      538  

EBITDA marginc

     66     62     6  %      62     57     8  %      63

Capital expenditures ($ millions)d

     14       16       (13 %)      64       87       (26 )%      69  

Minesite sustainingd

     14       16       (13 %)      64       87       (26 )%      69  

Projectd

     0       0       0     0       0       0  %      0  

Cost of sales ($/oz)

     660       807       (18 %)      747       750       0  %      699  

Total cash costs ($/oz)b

     422       504       (16 %)      471       465       1  %      405  

All-in sustaining costs ($/oz)b

     517       631       (18 %)      592       623       (5 )%      525  

All-in costs ($/oz)b

     525       636       (17 %)      600       623       (4 )%      525  

 

  a.

Pueblo Viejo is accounted for as a subsidiary with a 40% non-controlling interest. The results in the table and the discussion that follows are based on our 60% share only.

  b.

These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 91 to 112 of this MD&A.

  c.

Represents EBITDA divided by revenue.

  d.

Presented on a cash basis as a result of adopting IFRS 16 Leases starting in the first quarter of 2019. Capital expenditures for 2018 and 2017 are presented on an accrued basis. Please refer to page 27 of this MD&A for more details.

 

Safety and Environment

There were no LTIs at Pueblo Viejo during the quarter which resulted in an LTIFR of zero per million hours worked, consistent with the previous quarter. No Class 1 environmental incidents were reported during the quarter.

Financial Results

Q4 2019 compared to Q3 2019

Pueblo Viejo’s income for the fourth quarter of 2019 was 20% higher than the third quarter of 2019 due to higher sales volume and lower cost of sales per ounce5.

Gold production for the fourth quarter of 2019 was 29% higher than the prior quarter mainly due to higher throughput following optimization work resulting in record oxidized sulfur tonnes as well as the completion of scheduled maintenance that occurred in the third quarter of 2019.

Cost of sales per ounce5 and total cash costs per ounce4 for the fourth quarter of 2019 were 18% and 16% lower, respectively, than the prior quarter primarily reflecting the impact of higher sales volume that was driven by the increase in grade and throughput. For the fourth quarter of 2019, all-in sustaining costs per ounce4 decreased by 18% mainly reflecting lower total cash costs per ounce4 and lower minesite sustaining capital expenditures.

Capital expenditures for the fourth quarter of 2019 decreased by 13% compared to the prior quarter, primarily due to lower expenditures at the Llagal Tailings Storage Facility and the completion of the replacement of oxygen plant motors in the third quarter of 2019.

2019 compared to 2018

Pueblo Viejo’s income for 2019 was 18% higher than the prior year due to higher realized gold prices4, while sales volume and cost of sales per ounce5 remained relatively consistent.

Income and EBITDA4

(unaudited)

 

LOGO

 

 

BARRICK YEAR-END 2019   60   MANAGEMENT’S DISCUSSION AND ANALYSIS


Gold production for 2019 was 2% higher than the prior year mainly due to higher tonnes processed, partially offset by lower grade.

Production

(000s ounces)

 

 

LOGO

Cost of sales per ounce5 and total cash costs per ounce4 for 2019 were in line and increased by 1%, respectively, compared to the prior year primarily reflecting the impact of slightly lower sales volume. For 2019, all-in sustaining costs per ounce4 decreased by 5% mainly reflecting lower minesite sustaining capital expenditures, partially offset by slightly higher total cash costs per ounce4.

Cost of Sales5, Total Cash Costs4 and AISC4

($ per ounce) (unaudited)

 

 

LOGO

Capital expenditures for 2019 decreased by 26% compared to the prior year, primarily due to lower capitalized stripping from the Monte Negro and Cumba pits compared to a higher proportion of tonnes mined in the prior year from the Moore pit in accordance with the mine plan. This was combined with a decrease in tailings storage facility construction activities during the year.

2019 compared to Outlook

Gold production in 2019 of 590 thousand ounces was at the high end of the guidance range of 550 to 600 thousand ounces. Cost of sales per ounce5 of $747 was better than the guidance range of $780 to $830 per ounce. Total cash costs per ounce4 of $471 was at the low end of the guidance range of $465 to $510 per ounce. All-in sustaining costs per ounce4 of $592 was better than the guidance range of $610 to $650 per ounce.

 

 

 

BARRICK YEAR-END 2019   61   MANAGEMENT’S DISCUSSION AND ANALYSIS


Loulo-Gounkoto (80% basis)a, Mali

 

Summary of Operating and Financial Data    For the three months ended     For the years ended  
(unaudited)    12/31/19     9/30/19     % Change     12/31/19     12/31/18b     % Change     12/31/17b  

Total tonnes mined (000s)

     7,250       8,115       (11 )%      32,192       30,926       4  %      27,972  

Open pit ore

     1,080       286       278  %      2,726       3,484       (22 )%      1,875  

Open pit waste

     5,566       7,244       (23 )%      27,183       25,278       8  %      23,925  

Underground

     604       585       3  %      2,283       2,164       5  %      2,172  

Average grade (grams/tonne)

              

Open pit mined

     5.69       4.06       40  %      4.83       3.10       56  %      4.10  

Underground mined

     5.14       5.09       1  %      4.67       5.10       (8 )%      6.20  

Processed

     5.64       5.14       10  %      4.90       4.31       14  %      4.98  

Ore tonnes processed (000s)

     886       1,013       (13 )%      3,945       4,123       (4 )%      3,934  

Recovery rate

     89     92     (3 )%      92     92     0  %      93

Gold produced (000s oz)

     144       153       (6 )%      572       528       8  %      584  

Gold sold (000s oz)

     144       155       (7 )%      575       534       8  %      579  

Revenue ($ millions)

     214       230       (7 )%      806        

Cost of sales ($ millions)

     149       159       (7 )%      601        

Income ($ millions)

     65       64       1  %      190        

EBITDA ($ millions)c

     123       125       (1 )%      426        

EBITDA margind

     58     54     6  %      53      

Capital expenditures ($ millions)

     38       49       (22 )%      136        

Minesite sustaining

     37       49       (24 )%      133        

Project

     1       0       100  %      3        

Cost of sales ($/oz)

     1,037       1,018       2  %      1,044        

Total cash costs ($/oz)c

     631       630       0  %      634        

All-in sustaining costs ($/oz)c

     917       966       (5 )%      886        

All-in costs ($/oz)c

     922       971       (5 )%      891                          

 

  a.

Barrick owns 80% of Société des Mines de Loulo SA and Société des Mines de Gounkoto with the Republic of Mali owning 20%. Loulo-Gounkoto is accounted for as a subsidiary with a 20% non-controlling interest on the basis that Barrick controls the asset. The results in the table and the discussion that follows are based on our 80% share inclusive of the impact of the purchase price allocation resulting from the Merger.

  b.

These results did not form a part of the Barrick consolidated results as this site was acquired as a result of the Merger. As a result, operational statistics are presented for reference purposes only.

  c.

These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 91 to 112 of this MD&A.

  d.

Represents EBITDA divided by revenue.

 

Safety and Environment

There were no LTIs during the fourth quarter at Loulo-Gounkoto, which was in line with the previous quarter. No Class 1 environmental incidents were recorded.

Financial Results

Q4 2019 compared to Q3 2019

Loulo-Gounkoto’s income for the fourth quarter of 2019 was in line with the prior quarter.

Gold production for the fourth quarter of 2019 was 6% lower than the prior quarter mainly due to lower plant throughput due to a girth gear failure, partially offset by higher feed grade from both Yalea and the Gounkoto South Pit. The girth gear was repaired in December 2019.

Cost of sales per ounce5 for the fourth quarter of 2019 was 2% higher than the prior quarter primarily due to higher depreciation per ounce. Total cash costs per ounce4 was in line with the prior quarter as the impact of lower throughput was largely offset by the impact of the higher grade processed. For the fourth quarter of 2019, all-in sustaining costs per ounce4 decreased by 5% compared to the prior quarter

reflecting lower sustaining capital expenditures from reduced capitalized stripping.

Capital expenditures for the fourth quarter of 2019 decreased by 22% compared to the prior quarter, primarily due to lower capitalized stripping costs.

2019

Loulo-Gounkoto’s income for 2019 was $190 million.

Gold production in 2019 was 8% higher compared to the same prior year period, primarily due to higher feed grade from Yalea and the Gounkoto South Pit.

Production

(000s ounces)

 

 

LOGO

 

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                       

 

BARRICK YEAR-END 2019   62   MANAGEMENT’S DISCUSSION AND ANALYSIS


Cost of sales per ounce5 and total cash costs per ounce4 in 2019 were $1,044 and $634, respectively. Cost of sales per ounce5 and total cash costs per ounce4 were positively impacted primarily by the higher feed grade to the mill. For 2019, all-in sustaining costs4 were $886 per ounce.

Cost of Sales5, Total Cash Costs4 and AISC4

($ per ounce) (unaudited)

 

 

LOGO

Capital expenditures in 2019 were $136 million, consisting of underground development and drilling in Gara and Yalea, as well as sustaining capital related to our solar power project at Loulo, capitalized drilling and expansion of the TSF.

2019 compared to Outlook

Gold production in 2019 of 572 thousand ounces was marginally above the guidance range of 520 to 570 thousand ounces. Cost of sales per ounce5 of $1,044 was higher than the guidance range of $880 to $930 per ounce. Total cash costs per ounce4 and all-in sustaining costs per ounce4 of $634 and $886, respectively, were also marginally above the guidance ranges of $575 to $625 per ounce and $810 to $850 per ounce, respectively.

 

 

BARRICK YEAR-END 2019   63   MANAGEMENT’S DISCUSSION AND ANALYSIS


Kibali (45% basis)a, Democratic Republic of Congo

 

Summary of Operating and Financial Data    For the three months ended     For the years ended  
(unaudited)    12/31/19     9/30/19     % Change     12/31/19     12/31/18b     % Change     12/31/17b  

Total tonnes mined (000s)

     3,096       3,077       1  %      12,273       14,790       (17 )%      16,435  

Open pit ore

     346       269       29  %      1,693       2,455       (31 )%      2,239  

Open pit waste

     2,290       2,330       (2 )%      8,824       10,709       (18 )%      13,275  

Underground

     460       478       (4 )%      1,756       1,626       8  %      921  

Average grade (grams/tonne)

              

Open pit mined

     2.21       2.26       (2 )%      2.32       2.43       (4 )%      2.39  

Underground mined

     4.68       5.17       (9 )%      5.12       5.06       1  %      5.51  

Processed

     3.67       3.74       (2 )%      3.80       3.45       10  %      2.92  

Ore tonnes processed (000s)

     839       852       (2 )%      3,381       3,698       (9 )%      3,429  

Recovery rate

     88     88     0  %      89     89     0  %      83

Gold produced (000s oz)

     87       91       (4 )%      366       363       1  %      268  

Gold sold (000s oz)

     89       89       0  %      363       370       (2 )%      272  

Revenue ($ millions)

     130       133       (2 )%      505        

Cost of sales ($ millions)

     106       107       (1 )%      403        

Income ($ millions)

     30       25       20  %      108        

EBITDA ($ millions)c

     82       82       0  %      304        

EBITDA margind

     63     62     2  %      60      

Capital expenditures ($ millions)

     9       14       (36 )%      43        

Minesite sustaining

     9       13       (31 )%      41        

Project

     0       1       (100 )%      2        

Cost of sales ($/oz)

     1,205       1,187       2  %      1,111        

Total cash costs ($/oz)c

     608       554       10  %      568        

All-in sustaining costs ($/oz)c

     740       703       5  %      693        

All-in costs ($/oz)c

     746       717       4  %      701                          

 

  a.

Barrick owns 45% of Kibali Goldmines SA (Kibali) with the Democratic Republic of Congo (“DRC”) and our joint venture partner, AngloGold Ashanti, owning 10% and 45%, respectively. Kibali is accounted for as an equity method investment on the basis that the joint venture partners that have joint control have rights to the net assets of the joint venture. The figures presented in this table and the discussion that follows are based on our 45% effective interest in Kibali inclusive of the impact of the purchase price allocation resulting from the Merger.

  b.

These results did not form a part of the Barrick consolidated results as this site was acquired as a result of the Merger. As a result, operational statistics are presented for reference purposes only.

  c.

These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 91 to 112 of this MD&A.

  d.

Represents EBITDA divided by revenue.

 

Safety and Environment

Kibali did not sustain any LTIs during the fourth quarter, in line with the safety performance of the previous quarter. No Class 1 environmental incidents were recorded.

Financial Results

Q4 2019 compared to Q3 2019

Kibali’s income for the fourth quarter of 2019 was 20% higher than the third quarter of 2019.

Gold production for the fourth quarter of 2019 was 4% lower than the prior quarter as grade fed to the plant decreased in comparison with the prior period, in line with plan, as the restoration of stockpiles following the second quarter winder failure continued. Additionally, plant throughput decreased marginally, in line with plan.

Cost of sales per ounce5 and total cash costs per ounce4 for the fourth quarter of 2019 were 2% and 10% higher, respectively, than the prior quarter primarily due to the decrease in grade fed to the plant, increased grade control drilling costs and an increase in stripping costs that were

expensed. This was offset by lower quarter-on-quarter general and administrative expenditure.

For the fourth quarter of 2019, all-in sustaining costs per ounce4 increased by 5% compared to the prior quarter, reflecting higher total cash costs per ounce4 offset by lower minesite sustaining capital expenditures as detailed below, when compared with the previous period.

Capital expenditures for the fourth quarter of 2019 decreased by 36% due to lower capitalized stripping and underground development, although these were in line with plan.

2019

Kibali’s income for 2019 was $108 million.

Gold production in 2019 was 1% higher compared to the same prior year period, primarily due to increased feed grade in the current period as a result of blending more higher grade underground material in line with the mine plan, partially offset by decreased throughput.

 

 

BARRICK YEAR-END 2019   64   MANAGEMENT’S DISCUSSION AND ANALYSIS


Production

(000s ounces)

 

LOGO

Cost of sales per ounce5 and total cash costs per ounce4 in 2019 were $1,111 and $568 per ounce, respectively. Cost of sales includes the depreciation charge relating to the purchase price allocation fair value increment. Although total cash costs per ounce4 were impacted by higher operating expenditures in the first quarter of the year, cost performance has improved over the remainder of the year. For 2019, all-in sustaining costs per ounce4 were $693 per ounce.

Cost of Sales5, Total Cash Costs4 and AISC4

($ per ounce) (unaudited)

 

 

LOGO

Capital expenditures in 2019 were $43 million, consisting of underground mining development, underground hauling equipment, capitalized stripping, capitalized drilling and rebuilds of mobile equipment.

2019 compared to Outlook

Gold production in 2019 of 366 thousand ounces was higher than the guidance range of 330 to 350 thousand ounces. Cost of sales per ounce5 of $1,111 was also better than the guidance range of $1,150 to $1,200 per ounce. Total cash costs per ounce4 and all-in sustaining costs per ounce4 of $568 and $693, respectively, were in the lower half of the guidance ranges of $555 to $605 per ounce and $670 to $730 per ounce, respectively.

 

 

BARRICK YEAR-END 2019   65   MANAGEMENT’S DISCUSSION AND ANALYSIS


Veladero (50% basis)a,b, Argentina

 

Summary of Operating and Financial Data    For the three months ended     For the years ended  
(unaudited)    12/31/19     9/30/19     % Change     12/31/19     12/31/18     % Change     12/31/17  

Open pit tonnes mined (000s)

     10,277       9,449       9  %      36,758       35,646       3  %      48,376  

Open pit ore

     4,828       3,909       24  %      16,048       15,718       2  %      21,558  

Open pit waste

     5,449       5,540       (2 )%      20,710       19,928       4  %      26,818  

Average grade (grams/tonne)

              

Open pit mined

     0.80       0.68       18  %      0.71       0.78       (9 )%      1.00  

Processed

     0.88       0.74       19  %      0.79       0.85       (8 )%      1.02  

Heap leach ore tonnes processed (000s)

     3,880       3,463       12  %      13,587       13,547       0  %      21,190  

Gold produced (000s oz)

     71       58       22  %      274       278       (1 )%      432  

Gold sold (000s oz)

     70       59       19  %      271       280       (3 )%      458  

Revenue ($ millions)

     106       89       19  %      386       366       5  %      591  

Cost of sales ($ millions)

     82       72       14  %      323       310       4  %      410  

Income ($ millions)

     21       14       50  %      57       53       8  %      173  

EBITDA ($ millions)c

     50       39       28  %      172       174       (1 )%      292  

EBITDA margind

     47     44     8  %      45     48     (6 )%      49

Capital expenditures ($ millions)e

     28       19       47  %      106       143       (26 )%      173  

Minesite sustaininge

     28       19       47  %      91       143       (37 )%      173  

Projecte

     0       0       0  %      15       0       0  %      0  

Cost of sales ($/oz)

     1,138       1,243       (8 )%      1,188       1,112       7  %      897  

Total cash costs ($/oz)c

     710       773       (8 )%      734       629       17  %      598  

All-in sustaining costs ($/oz)c

     1,142       1,142       0  %      1,105       1,154       (4 )%      987  

All-in costs ($/oz)c

     1,142       1,142       0  %      1,162       1,154       1  %      987  

 

  a.

Barrick owns 50% of Veladero with our joint venture partner, Shandong Gold, owning the remaining 50%. Veladero is proportionately consolidated on the basis that the joint venture partners that have joint control have rights to the assets and obligations for the liabilities relating to the arrangement. The figures presented in this table and the discussion that follows are based on our 50% interest in Veladero inclusive of the impact of remeasurement of our interest in Veladero following the disposal of a 50% interest on June 30, 2017.

  b.

On June 30, 2017, we sold 50% of Veladero; therefore, these represent results on a 100% basis from January 1 to June 30, 2017 and on a 50% basis from July 1, 2017 onwards.

  c.

These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 91 to 112 of this MD&A.

  d.

Represents EBITDA divided by revenue.

  e.

Presented on a cash basis as a result of adopting IFRS 16 Leases starting in the first quarter of 2019. Capital expenditures for 2018 and 2017 are presented on an accrued basis. Please refer to page 27 of this MD&A for more details.

 

Safety and Environment

At Veladero, two LTIs were recorded during the quarter resulting in a LTIFR of 1.24 per million hours worked versus 0.52 the previous quarter. No Class 1 environmental incidents occurred during the quarter.

Minera Andina del Sol SRL, the joint venture company that operates the Veladero mine, is the subject of various regulatory proceedings related to operational incidents occurring in March 2017, September 2016 and September 2015.

Financial Results

Q4 2019 compared to Q3 2019

Veladero’s income for the fourth quarter of 2019 was 50% higher than the third quarter of 2019 primarily due to higher sales volume and lower cost of sales per ounce5.

Gold production in the fourth quarter of 2019 was 22% higher than the prior quarter, primarily due to higher ore grades and higher tonnages processed, partially offset by lower leach pad recoveries.

Cost of sales per ounce5 and total cash costs per ounce4 in the fourth quarter of 2019 both decreased by 8%, mainly due to the impact of higher sales volumes, partially offset by higher direct mining costs, export duties and royalties from increased realized gold prices. In the fourth quarter of 2019, all-in sustaining costs per ounce4 remained in line with the prior quarter as lower total cash costs per ounce4 were offset by higher minesite sustaining capital expenditures.

Capital expenditures in the fourth quarter of 2019 increased by 47% compared to the prior quarter mainly relating to construction activities for leach pad expansion phases 4B, 5B and 6, combined with higher capitalized stripping.

2019 compared to 2018

Veladero’s income for 2019 was 8% higher than the prior year primarily due to higher realized gold prices4, partially offset by lower sales volumes and higher cost of sales per ounce5.

 

 

BARRICK YEAR-END 2019   66   MANAGEMENT’S DISCUSSION AND ANALYSIS


Income and EBITDA4, a

(unaudited)

 

LOGO

a The results are on an 100% basis from January 1, 2017 to June 30, 2017 and on an 50% basis from July 1, 2017 onwards.

In 2019, gold production exceeded guidance with better than expected results from leach pad recovery initiatives and improved solution management. As a result, gold production was relatively consistent with the prior year as lower ore grades processed were partially offset by higher leach pad recoveries.

Productiona

(000s ounces)

 

LOGO

a The results are on an 100% basis from January 1, 2017 to June 30, 2017 and on an 50% basis from July 1, 2017 onwards.

In 2019, cost of sales per ounce5 and total cash costs per ounce4 increased by 7% and 17%, respectively, compared to the prior year mainly due to higher export duties and royalties resulting from increased realized gold prices4 and the export tax announced in September 2018 by the Argentine government. This was partially offset by the devaluation of the Argentine peso and business improvement initiatives. Cost of sales per ounce5 was further impacted by lower depreciation expense.

All-in sustaining costs per ounce4 in 2019 decreased by 4% compared to the prior year primarily due to a decrease in minesite sustaining capital expenditures on a per ounce basis, partially offset by an increase in total cash costs per ounce4.

Cost of Sales5, Total Cash Costs4 and AISC4

($ per ounce) (unaudited)

 

LOGO

In 2019, capital expenditures decreased by 26% compared to the prior year mainly due to the funding of a power transmission line in Argentina as a result of an agreement made with the Provincial Power Regulatory Body of San Juan (“EPRE”) occurring in the prior year, lower capitalized stripping and lower purchases of components and mine equipment, partially offset by an increase in construction activities for leach pad expansion phases 4B, 5B, and 6.

2019 compared to Outlook

Gold production in 2019 of 274 thousand ounces exceeded the guidance range of 230 to 250 thousand ounces. All cost metrics came in below guidance. Cost of sales per ounce5 was $1,188 compared to the guidance range of $1,250 to $1,350 per ounce. Total cash costs per ounce4 was $734 compared to $770 to $820 per ounce, and all-in sustaining costs per ounce4 was $1,105, compared to $1,150 to $1,250 per ounce.

Regulatory matters

On December 14, 2019, the President of Argentina abolished the exchange rate limit applied to the calculation of export duties (previously ARS 4 for each $1). On December 23, 2019, the Argentine Congress further enacted an emergency law setting a maximum rate for mining export duties at 8%; however, this emergency law has not yet entered into force. Barrick is seeking the immediate implementation of the reduced 8% cap for customs purposes; however, a decision on this has not yet been made.

 

 

BARRICK YEAR-END 2019   67   MANAGEMENT’S DISCUSSION AND ANALYSIS


Porgera (47.5% basis)a, Papua New Guinea

 

Summary of Operating and Financial Data    For the three months ended     For the years ended  
(unaudited)    12/31/19     9/30/19     % Change     12/31/19     12/31/18     % Change     12/31/17  

Total tonnes mined (000s)

     2,880       3,657       (21 )%      13,156       9,862       33  %      11,504  

Open pit ore

     509       495       3  %      1,825       568       221  %      767  

Open pit waste

     2,124       2,914       (27 )%      10,406       8,529       22  %      9,912  

Underground

     247       248       0  %      925       765       21  %      825  

Average grade (grams/tonne)

              

Open pit mined

     2.07       2.07       0  %      1.92       2.06       (7 )%      1.87  

Underground mined

     7.86       5.88       34  %      6.67       6.93       (4 )%      6.57  

Processed

     3.94       3.33       18  %      3.44       3.46       (1 )%      3.03  

Autoclave ore tonnes processed (000s)

     705       705       0  %      2,640       2,138       23  %      2,798  

Recovery Rate

     92     90     2  %      91     86     5  %      86

Gold produced (000s oz)

     82       75       9  %      284       204       39  %      235  

Gold sold (000s oz)

     82       75       9  %      285       213       34  %      253  

Revenue ($ millions)

     123       111       11  %      403       269       50  %      322  

Cost of sales ($ millions)

     75       76       (1 )%      284       212       34  %      238  

Income ($ millions)

     44       35       26  %      113       56       102  %      83  

EBITDA ($ millions)b

     56       46       22  %      155       98       58  %      121  

EBITDA marginc

     46     44     4  %      38     36     6  %      38

Capital expenditures ($ millions)d

     11       14       (21 )%      45       62       (28 )%      55  

Minesite sustainingd

     11       14       (21 )%      45       62       (28 )%      55  

Projectd

     0       0       0  %      0       0       0  %      0  

Cost of sales ($/oz)

     909       1,024       (11 )%      994       996       0  %      944  

Total cash costs ($/oz)b

     757       868       (13 )%      838       796       5  %      781  

All-in sustaining costs ($/oz)b

     894       1,053       (15 )%      1,003       1,083       (7 )%      993  

All-in costs ($/oz)b

     894       1,053       (15 )%      1,003       1,083       (7 )%      993  

 

  a.

Barrick owns 47.5% of Porgera with our joint venture partners, Zijin Mining and Mineral Resources Enga, owning the remaining 47.5% and 5%, respectively. Porgera is proportionately consolidated on the basis that the joint venture partners that have joint control have rights to the assets and obligations for the liabilities relating to the arrangement. The figures presented in this table and the discussion that follows are based on our 47.5% interest in Porgera.

  b.

These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 91 to 112 of this MD&A.

  c.

Represents EBITDA divided by revenue.

  d.

Presented on a cash basis as a result of adopting IFRS 16 Leases starting in the first quarter of 2019. Capital expenditures for 2018 and 2017 are presented on an accrued basis. Please refer to page 27 of this MD&A for more details.

 

Safety and Environment

There were 3 LTIs at Porgera during the quarter which resulted in an LTIFR of 1.04 per million hours worked versus 1.05 the previous quarter. No Class 1 environmental incidents were reported during the quarter.

Financial Results

Q4 2019 compared to Q3 2019

Porgera’s income for the fourth quarter of 2019 was 26% higher than the third quarter of 2019 primarily due to higher sales volume reflecting higher gold production and a decrease in cost of sales per ounce5.

Gold production in the fourth quarter of 2019 was 9% higher than the prior quarter, primarily due to higher underground ore grade mined and processed.

Cost of sales per ounce5 and total cash costs per ounce4 in the fourth quarter of 2019 decreased by 11% and 13%, respectively. This was mainly due to the higher underground grade processed and the depletion of historic concentrate

stockpiles in the previous quarter that was included in inventory at higher unit costs.

In the fourth quarter of 2019, all-in sustaining costs per ounce4 decreased by 15% compared to the prior quarter due to the decrease in total cash costs per ounce4 and lower minesite sustaining capital expenditures.

Capital expenditures in the fourth quarter of 2019 decreased by 21% compared to the prior quarter due to lower capitalized stripping as the mining sequence changed from predominantly waste stripping to ore production, in line with the mine plan for the quarter.

2019 compared to 2018

Porgera’s income for 2019 was 102% higher than the prior year, primarily due to an increase in sales volume and higher realized gold prices4. In 2018, operations at Porgera were impacted by an earthquake which disrupted power supply for an extended period. This impacted all of the performance and cost metrics for 2018.

 

 

BARRICK YEAR-END 2019   68   MANAGEMENT’S DISCUSSION AND ANALYSIS


Income and EBITDA4

(unaudited)

 

 

LOGO

In 2019, gold production exceeded the top end of the guidance range and was 39% higher compared to the prior year, reflecting a strong finish to the year given better mill availability in the second half of 2019 as well as the impact to operations from the earthquake in the prior year.

Production

(000s ounces)

 

LOGO

In 2019, cost of sales per ounce5 remained consistent with the prior year, while total cash costs per ounce4 increased by 5%. Higher total cash costs per ounce4 were due to increased energy costs related to power line interruptions during the first half of 2019, higher freight costs and increased maintenance activities following the deferral of this work in 2018 due to the earthquake. This was partially offset by the impact of higher sales volume.

All-in sustaining costs4 in 2019 decreased by 7% compared to the prior year due to lower minesite sustaining capital expenditures, partially offset by increased total cash costs per ounce4.

Cost of Sales5, Total Cash Costs4 and AISC4

($ per ounce) (unaudited)

 

 

LOGO

In 2019, capital expenditures decreased by 28% compared to the prior year primarily due to lower capitalized stripping as the mining sequence changed from predominantly waste stripping to ore production, in line with the mine plan.

2019 compared to Outlook

Gold production in 2019 of 284 thousand ounces exceeded the guidance range of 240 to 260 thousand ounces. All cost metrics were within guidance. Cost of sales per ounce5 of $994 was in the lower end of the guidance range of $980 to $1,030 per ounce. Total cash costs per ounce4 was $838 compared to $800 to $850 per ounce, and all-in sustaining costs per ounce4 was $1,003, compared to $985 to $1,025 per ounce.

Regulatory Matters

Porgera’s current Special Mining Lease terminated on August 16, 2019. The company has been working constructively with the government of Papua New Guinea to negotiate a 20-year extension. On August 2, 2019, the National Court of Papua New Guinea ruled that the provisions of the country’s 1992 Mining Act applied to the Porgera gold mine, thus allowing it to continue operating while the application to extend its Special Mining Lease is being considered. The Company expects to reach an agreement with the government and does not expect interruptions to the operation while these discussions are ongoing.

 

 

BARRICK YEAR-END 2019   69   MANAGEMENT’S DISCUSSION AND ANALYSIS


North Maraa, Tanzania

 

Summary of Operating and Financial Data    For the three months ended     For the years ended  
(unaudited)    12/31/19     9/30/19     % Change     12/31/19     12/31/18     % Change     12/31/17  

Total tonnes mined (000s)

     3,529       1,780       98  %      10,388       10,821       (4 )%      10,469  

Open pit ore

     1,854       667       178  %      3,987       1,837       117  %      2,011  

Open pit waste

     1,288       970       33  %      5,532       8,218       (33 )%      7,765  

Underground

     387       143       170  %      869       766       13  %      693  

Average grade (grams/tonne)

              

Open pit mined

     2.12       1.89       12  %      2.03       2.00       2  %      1.73  

Underground mined

     5.30       6.87       (23 )%      6.82       7.79       (12 )%      8.68  

Processedb

     4.78       5.58       (14 )%      4.50       3.96       14  %      3.85  

Ore tonnes processed (000s)

     714       172       316  %      1,829       1,819       1  %      1,815  

Recovery rate

     94     94     0  %      94     93     1  %      92

Mining

     94     94     0  %      94     93     1  %      92

Gold produced (000s oz)

     103       29       253  %      251       215       17  %      207  

Gold sold (000s oz)

     103       36       186  %      248       212       17  %      207  

Revenue ($ millions)

     153       55       178     350       270       30  %      261  

Cost of sales ($ millions)

     105       33       216  %      236       169       40  %      141  

Income ($ millions)

     52       20       163  %      112       94       19  %      112  

EBITDA ($ millions)c

     87       31       184  %      187       134       40  %      148  

EBITDA margind

     57     56     2  %      53     49     8  %      57

Capital expenditures ($ millions)e

     16       9       73  %      42       52       (19 )%      59  

Minesite sustaininge

     15       8       83  %      36       47       (23 )%      52  

Projecte

     1       1       0  %      6       5       20  %      7  

Cost of sales ($/oz)

     1,021       907       13  %      953       795       20  %      683  

Total cash costs ($/oz)c

     675       603       12  %      646       603       7  %      509  

All-in sustaining costs ($/oz)c

     830       850       (2 )%      802       830       (3 )%      773  

All-in costs ($/oz)c

     840       886       (5 )%      824       855       (4 )%      804  

 

  a.

Formerly part of Acacia Mining plc. On September 17, 2019, Barrick acquired all of the shares of Acacia it did not own. The results are on a 63.9% basis until September 30, 2019 and on a 100% basis from October 1, 2019 onwards.

  b.

Includes tailings retreatment.

  c.

These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 91 to 112 of this MD&A.

  d.

Represents EBITDA divided by revenue.

  e.

Presented on a cash basis as a result of adopting IFRS 16 Leases starting in the first quarter of 2019. Capital expenditures for 2018 and 2017 are presented on an accrued basis. Please refer to page 27 of this MD&A for more details.

 

On January 24, 2020, Barrick announced that the Company had ratified the creation of Twiga at a signing ceremony with the President of Tanzania, formalizing the establishment of a joint venture between Barrick and the Government of Tanzania (“GoT”) and resolution of all outstanding disputes between Barrick and the GoT. The GoT will receive a free carried shareholding of 16% in each of the former Acacia mines (Bulyanhulu, Buzwagi and North Mara), and will receive its half of the economic benefits from taxes, royalties, clearing fees and participation in all cash distributions made by the mines and Twiga, after the recoupment of capital investments. Twiga will provide management services to the mines. The GoT’s free-carried interest is expected to be made effective as of January 1, 2020.

Financial Results

Q4 2019 compared to Q3 2019

North Mara’s income for the fourth quarter of 2019 was 163% higher than the third quarter of 2019, mainly due to the impact of the acquisition of all of the shares that we did not own of Acacia on September 17, 2019. This resulted in our

attributable share of income being reported at 100% compared to 63.9% in the prior quarter. This was combined with higher sales volume as the prior quarter was impacted by a prohibition notice issued by the Tanzanian National Environment Management Council (“NEMC”) on July 16, 2019 (the “Prohibition Notice”) which resulted in the closure of the tailings storage facility (“TSF”) and shutdown of the processing plant for approximately two months. This was partially offset by higher cost of sales in the fourth quarter of 2019.

In the fourth quarter of 2019, gold production was 253% higher than the prior quarter, primarily due to the Prohibition Notice that occurred in the prior quarter, as discussed above and further below. This was further impacted by the acquisition of all of the shares that we did not own of Acacia, which resulted in an increase in our attributable production from 63.9% to 100%.

Cost of sales per ounce5 and total cash costs per ounce4 in the fourth quarter of 2019 were 13% and 12% higher, respectively, than the prior quarter primarily due to higher

 

 

BARRICK YEAR-END 2019   70   MANAGEMENT’S DISCUSSION AND ANALYSIS


sales-related costs driven by sales volumes and higher processing consumables costs, partly offset by lower general and administrative costs as the third quarter of 2019 included increased provisions for inventory obsolescence. All-in sustaining costs per ounce4 in the fourth quarter of 2019 were 2% lower than the prior quarter as a result of lower minesite sustaining capital expenditures on a per ounce sold basis, partially offset by higher total cash costs per ounce4.

Capital expenditures in the fourth quarter of 2019 were 73% higher than the third quarter of 2019, mainly due to the 36.1% increase in our attributable share of capital expenditures combined with higher minesite sustaining capital expenditures. Higher minesite sustaining capital expenditures are attributed to the deferral of capital projects due to the cash flow constraints experienced by Acacia as a result of the Prohibition Notice in the third quarter and the implementation of water management measures for the TSF.

2019 compared to 2018

North Mara’s income for 2019 was 19% higher than the prior year primarily due to the impact of the acquisition of all of the shares that we did not own of Acacia on September 17, 2019, as income was included at 100% starting from October 1, 2019. This was combined with higher realized gold prices4, partially offset by lower sales volumes and higher cost of sales per ounce5.

Income and EBITDA4,a

(unaudited)

 

 

LOGO

a The results are on a 63.9% basis from January 1, 2017 to September 30, 2019 and on a 100% basis from October 1, 2019 onwards.

In 2019, gold production was 17% higher than the prior year primarily due to the 36.1% increase in our shareholding and attributable production. This was partly offset by lower production due to the Prohibition Notice which resulted in the closure of the North Mara TSF and shutdown of the processing plant for most of the third quarter of 2019.

Productiona

(000s ounces)

 

LOGO

(unaudited)

a The results are on a 63.9% basis from January 1, 2018 to September 30, 2019 and on a 100% basis from October 1, 2019 onwards. As the GoT’s 16% free-carried interest is expected to be made effective as of January 1, 2020, our 2020 outlook represents our 84% share.

Cost of sales per ounce5 and total cash costs per ounce4 in 2019 were 20% and 7% higher, respectively, than the prior year mainly due to higher stripping costs expensed in the current period and an increase in provisions for supplies obsolescence, partly offset by the build-up of ore inventory stockpiles. All-in sustaining costs per ounce4 were 3% lower than the prior year due to a decrease in minesite sustaining capital expenditures driven by lower capitalized stripping costs on the back of lower strip ratios, partially offset by higher total cash costs per ounce4.

Cost of Sales 5, Total Cash Costs4 and AISC4

($ per ounce) (unaudited)

 

 

LOGO

In 2019, capital expenditures decreased by 19% compared to the prior year mainly due to lower minesite sustaining capital expenditures. Lower minesite sustaining capital expenditures were attributed to reduced capitalized stripping costs driven by a lower strip ratio as mining entered the main ore zone of the Nyabirama open pit.

2019 compared to Outlook

Overall guidance for 2019 was previously only provided in relation to Acacia and not at the mine site level.

North Mara Environmental Issues

During 2019, the GoT issued two environmental protection orders and directions to Acacia’s North Mara mine in relation to alleged breaches of environmental regulations relating to seepage from and the discharge of a hazardous substance from the North Mara TSF. In March 2019, the GoT directed the North Mara mine to resolve an incident that resulted in the spillage of water into the local environment. On July 16, 2019, the NEMC issued the Prohibition Notice to North Mara Gold Mine Limited (the Tanzanian operating company of the North Mara mine), which ordered the North Mara mine to suspend operations at its TSF on July 20, 2019. NEMC cited the North Mara mine’s failure to contain and prevent seepage from the TSF as grounds for its issuance of the Prohibition Notice.

On September 17, 2019, following the submission of a detailed action plan to remediate issues related to the TSF and the implementation of remedial measures to contain the seepage from the TSF, the Prohibition Notice was lifted and North Mara was permitted to resume operations at the TSF.

 

 

BARRICK YEAR-END 2019   71   MANAGEMENT’S DISCUSSION AND ANALYSIS


Other Mines - Gold

 

Summary of Operating and Financial Data              For the three months ended  
(unaudited)    12/31/19      9/30/19  
      Gold
produced
(000s oz)
    

Cost of
sales

($/oz)

    

Total
cash
costs

($/oz)a

    

All-in
sustaining
costs

($/oz)a

     Capital
Expend-
ituresb
     Gold
produced
(000s oz)
     Cost of
sales
($/oz)
    

Total cash
costs

($/oz)a

    

All-in
sustaining
costs

($/oz)a

     Capital
Expend-
ituresb
 

Kalgoorlie (50%)c

     36        1,127        940        1,172        6        58        1,037        856        1,170        15  

Tongon (89.7%)

     61        1,476        803        867        3        62        1,396        793        869        4  

Hemlo

     54        1,632        1,091        1,380        15        49        1,083        953        1,280        15  

Buzwagid

     28        1,235        1,144        1,169        0        18        1,292        1,202        1,220        0  

Bulyanhulud

     9        1,293        752        909        1        6        1,288        729        769        1  

Lagunas Nortee

                                                  33        1,661        1,327        1,422        0  

 

  a.

These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 91 to 112 of this MD&A.

  b.

Includes both minesite sustaining and project capital expenditures.

  c.

On November 28, 2019, we completed the sale of our 50% interest in Kalgoorlie in Western Australia to Saracen Mineral Holdings Limited for total cash consideration of $750 million. The transaction resulted in a gain of $408 million for the year ended December 31, 2019. The operating results reported for Kalgoorlie reflect the Company’s attributable share of Kalgoorlie’s results until the date of disposal.

  d.

Formerly part of Acacia Mining plc. On September 17, 2019, Barrick acquired all of the shares of Acacia it did not own.

  e.

As previously mentioned, as Lagunas Norte has transitioned to care and maintenance at the end of the third quarter of 2019, we have ceased to include the immaterial residual ounces in our production or non-GAAP cost metrics for this operation.

 

Kalgoorlie (50% basis), Australia

Gold production in the fourth quarter of 2019 for Kalgoorlie was 38% lower compared to the prior quarter, primarily due to the impact of the sale of our 50% interest in the Kalgoorlie mine on November 28, 2019. This was partially offset by higher recovery and throughput. Cost of sales per ounce5 in the fourth quarter of 2019 was 9% higher than the prior quarter mainly due to the impact of lower sales volume. In the fourth quarter of 2019, all-in sustaining costs per ounce4 was in line with the prior quarter as lower minesite sustaining capital expenditures was offset by higher total cash costs per ounce4.

Compared to our outlook, gold production in 2019 of 206 thousand ounces was below the guidance range of 260 to 280 thousand ounces, mainly due to the sale of our 50% interest in November 2019 and the exclusion zones put in place to safely manage the east and west walls of the pit as advised by Newmont (the operator during that time). Cost of sales per ounce5 of $1,062 was higher than the guidance range of $920 to $970 per ounce. Total cash costs per ounce4 and all-in sustaining costs per ounce4 of $873 and $1,183, respectively, were above the guidance ranges of $740 to $790 per ounce and $1,010 to $1,050 per ounce, respectively.

Tongon (89.7% basis), Côte d’Ivoire

Gold production for Tongon in the fourth quarter of 2019 was 2% lower than the prior quarter. Cost of sales per ounce5 in the fourth quarter of 2019 was 6% higher than the prior quarter as a result higher depreciation expense, partially offset by lower direct mining costs. All-in sustaining costs per ounce4 in the fourth quarter of 2019 was in line with the prior quarter as both minesite sustaining capital expenditures on a per ounce basis and total cash costs per ounce4 were largely in line with prior quarter.

Gold production in 2019 of 245 thousand ounces was slightly below the guidance range of 250 to 270 thousand ounces. Cost of sales per ounce5 of $1,469 was higher than the guidance range of $1,300 to $1,350 per ounce. Total cash costs per ounce4 and all-in sustaining costs per ounce4 of $787 and $844, respectively, were both slightly above the

guidance range of $710 to $760 per ounce and $780 to $820 per ounce, respectively.

Hemlo, Ontario, Canada

Hemlo’s gold production in the fourth quarter of 2019 was 10% higher than the prior quarter primarily due to higher mill throughput, partially offset by lower grade. Cost of sales per ounce5 in the fourth quarter of 2019 was 51% higher than the prior quarter primarily due to higher direct mining costs and higher royalties driven by an increase in realized gold prices4. In the fourth quarter of 2019, all-in sustaining costs per ounce4 increased by 8% compared to the prior quarter due to higher total cash costs4 with sustaining capital expenditures in line with the prior quarter.

Gold production in 2019 of 213 thousand ounces was within the guidance range of 200 to 220 thousand ounces. Cost of sales per ounce5 of $1,137 and total cash costs per ounce4 of $904 were both above the guidance range of $890 to $940 per ounce and $765 to $815 per ounce, respectively. All-in sustaining costs per ounce4 of $1,140 was within the guidance range of $1,100 to $1,200 per ounce.

Buzwagi, Tanzania

Gold production for Buzwagi in the fourth quarter of 2019 was 56% higher compared to the third quarter of 2019, primarily due to the acquisition of all of the shares that we did not own in Acacia on September 17, 2019, which resulted in an increase in our attributable production to 100% (previously 63.9%). Cost of sales per ounce5 in the fourth quarter of 2019 was 4% lower than the prior quarter, mainly due to lower maintenance and contractor services costs driven by the timing of process plant maintenance. All-in sustaining costs per ounce4 decreased by 4% compared to the prior quarter, primarily due to lower total cash costs per ounce4.

Overall guidance for 2019 was previously only provided in relation to Acacia and not at the minesite level.

 

 

BARRICK YEAR-END 2019   72   MANAGEMENT’S DISCUSSION AND ANALYSIS


Bulyanhulu, Tanzania

 

Gold production for Bulyanhulu in the fourth quarter of 2019 was 50% higher compared to the third quarter of 2019, primarily due to the acquisition of all of the shares that we did not own in Acacia on September 17, 2019, which resulted in an increase in our attributable production to 100% (previously 63.9%). Cost of sales per ounce5 in the fourth quarter of 2019 was largely in line with the prior quarter. All-in sustaining costs per ounce4 increased by 18% compared to the prior quarter, primarily due to the deferral of minesite sustaining capital

expenditures to the fourth quarter following cash flow constraints experienced by Acacia in the prior quarter as a result of the Prohibition Notice at North Mara.

Overall guidance for 2019 was previously only provided in relation to Acacia and not at the minesite level.

 

 

Other Mines - Copper

 

Summary of Operating and Financial Data              For the three months ended  
(unaudited)    12/31/19      9/30/19  
      Copper
production
(millions
of pounds)
    

Cost of
sales

($/lb)

    

C1 cash
costs

($/lb)a

    

All-in
sustaining
costs

($/lb)a

     Capital
Expend-
ituresb
     Copper
production
(millions of
pounds)
     Cost of
sales
($/lb)
     C1 cash
costs
($/lb)a
     All-in
sustaining
costs
($/lb)a
     Capital
Expend-
ituresb
 

Lumwana

     63        2.22        2.10        3.41        37        65        2.04        1.83        3.66        37  

Zaldívar (50%)

     36        2.59        1.95        2.56        21        32        2.18        1.55        1.91        11  

Jabal Sayid (50%)

     18        1.47        1.29        1.78        7        15        1.63        1.42        1.65        4  

 

  a.

These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 91 to 112 of this MD&A.

  b.

Includes both minesite sustaining and project capital expenditures.

 

Lumwana, Zambia

Copper production for Lumwana in the fourth quarter of 2019 was 3% lower than the prior quarter due to a slight decrease in throughput and grade, in line with plan. As previously announced, sales continued to be affected by a major refurbishment at one of the third-party smelters that processes a portion of the mine’s concentrate. The refurbishment was completed in January 2020. We are evaluating our opportunities with this third-party smelter to steadily sell the concentrate stockpiled during the refurbishment period through the course of the year. Cost of sales per pound5 in the fourth quarter of 2019 was 9% higher than the prior quarter primarily due to lower capitalized stripping. In the fourth quarter of 2019, all-in sustaining costs per pound4 decreased by 7% compared to the prior quarter, primarily due to lower minesite sustaining capital expenditures on a per ounce basis, partially offset by higher C1 cash costs per pound4.

Compared to our outlook, copper production in 2019 of 238 million pounds was near the high end of the guidance range of 210 to 240 million pounds. Cost of sales per pound5 and C1 cash costs per pound4 of $2.13 and $1.79, respectively, were both below the guidance range of $2.25 to $2.50 per pound and $1.80 to $2.10 per pound, respectively. All-in sustaining costs4 of $3.04 per pound was within the guidance range of $2.75 to $3.15 per pound.

Zaldívar (50% basis), Chile

Copper production for Zaldívar in the fourth quarter of 2019 was 13% higher than the prior quarter mainly due to higher throughput and grades as well as operational initiatives implemented to reduce leach pad lift heights and resting times between irrigation cycles to accelerate recoveries. Cost of sales per pound5 in the fourth quarter of 2019 was 19% higher than the prior quarter primarily due to costs associated with the settlement of labor contract negotiations and the social unrest offset partially by a weaker local currency. All-in

sustaining costs per pound4 increased by 34% compared to the prior quarter primarily due to the impact of higher capitalized stripping and sustaining capital expenditures corresponding to budgeted purchases of spare parts for mine equipment and plant components.

Copper production in 2019 of 128 million pounds was close to the high end of the guidance range of 120 to 130 million pounds. All cost metrics were within the guidance ranges. Cost of sales per pound5 was $2.46 compared to $2.40 to $2.70 per pound. C1 cash costs per pound4 was $1.77, compared to $1.65 to $1.85 per pound, and all-in sustaining costs4 was $2.15, compared to $2.00 to $2.20 per pound.

Jabal Sayid (50% basis), Saudi Arabia

Jabal Sayid’s copper production in the fourth quarter of 2019 was 20% higher compared to the prior quarter, primarily due to an increase in underground mined tonnes after an improvement in availability from new equipment as well as better grades. Cost of sales per pound5 in the fourth quarter of 2019 was 10% lower than the prior quarter as a result of processing material with improved grade, combined with lower processing as well as general and administrative expenses. All-in sustaining costs per pound4 in the fourth quarter of 2019 increased by 8% when compared to the prior quarter, as lower total cash costs4 was outweighed by increased minesite sustaining capital expenditures primarily relating to the concentrate filter expansion project.

Copper production in 2019 of 66 million pounds exceeded the guidance range of 45 to 60 million pounds. All cost metrics were below the guidance range. Cost of sales per pound5 was $1.53 compared to $2.00 to $2.30 per pound. C1 cash costs per pound4 was $1.26, compared to $1.60 to $1.90 per pound, and all-in sustaining costs4 was $1.51, compared to $1.60 to $1.90 per pound.

 

 

BARRICK YEAR-END 2019   73   MANAGEMENT’S DISCUSSION AND ANALYSIS


Growth Project Updates

Goldrush Complex, Nevada, USA

At the Goldrush Complex, updated resource models were completed for Goldrush and Fourmile and will be used as the basis of the final feasibility study. No changes to Goldrush mineral reserves have been declared in 2019; these will be updated in 2020 upon completion of mine design changes within the feasibility study. The mineral resources have been updated based on the new models with Goldrush now reported as part of Cortez underground resources as it is our intention for the Goldrush mine to be run under Cortez management once in production. We have standardized our mineral resource reporting to be inclusive of mineral reserves and all underground mineral resources are now reported within $1,500 per ounce stope optimized shells. We believe this better reflects the global underground potential of the deposits at the prescribed resource gold price and includes internal dilution within these stope shapes and, as such, there are higher tonnes at lower grade within the resource declarations. Attributable underground mineral resources at Goldrush (61.5%) now stands at 26.3 million tonnes at 7.8 g/t for 6.6 million ounces in the indicated category and 4.8 million tonnes at 7.60 g/t for 1.2 million ounces in the inferred category. Fourmile (100%) inferred underground mineral resources increased to 5.4 million tonnes at 10.9 g/t for 1.9 million ounces. Fourmile resources continue to be reported separately as it has not yet been contributed to Nevada Gold Mines.

A geotechnical mining rock mass model was also completed in the fourth quarter of 2019 and this will be used together with the updated geological and resource models to update stope and development designs for the feasibility study. Work on a localized dewatering model commenced in November 2019 and is progressing well with recommendations expected in the first quarter of 2020.

Construction of the twin exploration declines at Goldrush continues to progress ahead of schedule and achieved 1,296 meters of total development, an improvement of 328 meters compared to the 986 meters that was budgeted for the fourth quarter of 2019. Overall progress status stands at 61% (from 46% as at the end of the third quarter of 2019) and the forecast decline completion date is now November 2020 (previously March 2021). As at December 31, 2019, we have spent $128 million (including $19 million in the fourth quarter of 2019) on the Goldrush project inclusive of the exploration declines (100% basis). The current capital estimate for the Goldrush project is approximately $1.0 billion (100% basis), subject to the completion of the updated Goldrush feasibility study.

Permitting activities are advancing on-track following our submission of a Plan of Operations to the Bureau of Land Management in September 2019. We continue to expect updated mine and feed schedules by the third quarter of 2020 and the final Goldrush feasibility study to be completed in the first quarter of 2021.

Turquoise Ridge Third Shaft, Nevada, USA12

Construction of the third shaft at Turquoise Ridge, which has a hoisting capacity of 5,500 tonnes per day, continues to advance according to schedule and within budget, with efforts in 2019 focused on surface civil works and shaft sinking. Major progress in the fourth quarter of 2019 focused around sinking-plant commissioning and the commencement of sinking

activities. Shaft sinking commenced in early November and the shaft liner has advanced to a depth of 149 meters below collar. To date, we have spent $119 million (including $9 million in the fourth quarter of 2019) out of an estimated capital cost of approximately $300-$330 million (100% basis).

Pueblo Viejo Plant Expansion Study, Dominican Republic13

Studies remain supportive of a plant expansion at the Pueblo Viejo mine that could significantly increase throughput, allowing the mine to maintain average annual gold production of approximately 800,000 ounces after 2022 (100% basis).

Study work completed during the quarter resulted in a flowsheet adopting the upgrade of the existing autoclaves to “flash” (vaporize) additional water as the means of dissipating the extra heat from the higher sulfide feed to the pressure oxidation (POX) circuit. This involves additional high-pressure slurry pumps and recycle flash capability with thickening provided through an upgrade of existing facilities.

This oxidation solution provides for lower capital and operating costs compared to previously studied options. A new flotation circuit to enable higher sulfide feed for the oxidation circuit remains as previously proposed. Additional neutralization, flotation leach, limestone grinding and water treatment are also included in the new flowsheet. Fourth quarter debottlenecking studies identified a requirement for increased oxygen resulting in a revision of the oxygen plant design to 3,000 tonnes per day.

Block flow diagrams, process design criteria, process descriptions, process flow diagrams, and process and instrumentation drawings have been completed as have quantitative risk assessments during the fourth quarter of 2019. A preliminary operating and capital expenditure estimate, execution plan and schedule have been developed.

Work is also well advanced on the concept study for the management of additional tailings capacity to support the expansion of the process plant. In line with Pueblo Viejo’s environmental responsibility, baseline studies continue for the Environmental Impact Study for the process plant expansion.

Environmental Impact Studies are ongoing for additional tailings and waste rock management. Based on the advanced studies completed to date, we continue to progress our engineering and evaluation work towards a feasibility study for the process plant expansion and the proposed tailings storage facility.

Zaldívar Chloride Leach Project, Chile

Zaldívar is jointly owned by Antofagasta and Barrick and is operated by Antofagasta.

In December 2019, the Board of Compañía Minera Zaldívar approved the Chloride Leach Project. The capital cost of the project of $189 million (100% basis) consists of the cost of execution and commissioning as well as a joint venture board-controlled contingency provision. The project contemplates the construction of a chloride dosing system, an upgrade of the solvent extraction plant and the construction of additional washing ponds.

 

 

BARRICK YEAR-END 2019   74   MANAGEMENT’S DISCUSSION AND ANALYSIS


Work will begin early in 2020, with 2022 expected to be the first full year of operation. Upon completion, the project is expected to increase copper recoveries by more than 10 percentage points through the addition of chlorides to the leach solution and with further potential upside in recoveries possible depending on the type of ore being processed. This process is based on a proprietary technology called CuproChlor® that was developed by Antofagasta at its Michilla operation, which had similar ore types to those that are processed at Zaldívar. Once completed and in full operation, the project is expected to increase production at Zaldívar by approximately 10-15 kilotonnes per annum of copper at lower operating costs over the remaining life of the mine.

 

Veladero Power Transmission Project, Chile-Argentina

In 2019, we commenced construction of an extension to the existing Pascua-Lama power transmission line to connect to the Veladero mine. When completed in the second half of 2020, the power transmission line will allow Veladero to convert to grid power exported from Chile and cease operating the current high-cost diesel generation power plant located at site. A power purchase price agreement was also executed during the fourth quarter of 2019 to supply power from renewable energy that will significantly reduce Veladero’s carbon footprint.

 

 

Exploration

Nevada Gold Mines, Nevada, USA14

Nevada Gold Mines land holdings encompass more than two million acres across some of the best endowed gold trends in North America. Consolidation of these lands and associated data is being leveraged to build camp-scale, unified geologic models. In 2019, significant modeling advances were made with camp scale models created for the northern part of the Carlin Trend and Gold Quarry area. A preliminary geologic model of the consolidated Turquoise Ridge district was also completed in the fourth quarter of 2019.

During the fourth quarter of 2019, three diamond drill holes totaling 3,061 meters were completed across the Carlin Trend. A hole was completed within Little Boulder Basin at the end of the quarter. The hole intersected significant alteration and is the first of a series of framework holes to support target delineation in this area of extensive disturbance and post-mineral cover between Goldstrike and Leeville. One additional concept was tested to the south at Richmond Mountain during the quarter. The hole confirmed the geological interpretation. However, the alteration encountered was not encouraging.

At the Rain sub-district, noteworthy results from drilling completed in the second half of the year include two significant intercepts highlighting open-ended mineralization at two separate areas on this relatively underexplored portion of the southern Carlin Trend. The first hole (RAN-2355) intersected 6.1 meters at 8.52 g/t hosted in 130 meters of thick breccia overprinted by silicification and sulfidation altering a carbonate rock not traditionally considered a favorable host. The result validates potential for structurally controlled high-grade mineralization below the stratigraphic level of past exploration and production focus. The second hole evaluated potential along the northwest extension of the Rain fault corridor. The hole (RAN-2349) intersected 3.5 meters at 7.50 g/t about 600 meters south of the Rain fault and is open to the south and west. The potential of the Rain sub-district highlighted by these holes is a promising start to reinvigorating exploration in this target-rich area.

Heading into 2020, the Carlin Trend will become the most active exploration area in Barrick’s portfolio. Leveraging skills and knowledge from the recent success at Fourmile to make high-impact discoveries is the priority. To ensure effective target selection and testing, the program will continue to focus on building robust geologic understanding by relogging, mapping, sampling and drilling with data integrated into scale appropriate models.

At Turquoise Ridge, work towards unifying the geology model across this newly consolidated district is in progress. Merging of all available data is well advanced. Definition of the stratigraphic framework has prioritized marker unit identification with some success. A major relogging program will be advanced during the first quarter of 2020. The work will establish a more robust stratigraphic framework ahead of shifting focus to interpreting the structural framework necessary to delineating targets. Several target concepts have already emerged. These include an area of sparsely drilled favorable limestone host rock at the crest of a district-scale antiform cutting across the north end of the Twin Creeks Complex. The concept is supported by modeled geology and downhole geochemistry showing a vertically extensive auriferous and metal-rich plume. There are also several untested intersections of ore-controlling faults. These emerging targets will be prioritized together with additional concepts anticipated as the modeling and exploration effort matures.

Generative activities in Nevada have been reinvigorated with the consolidation of extensive data covering the Nevada Gold Mines area of interest. Regional scale modeling to link the major gold trends will begin early 2020. The effort will focus on delineating the Roberts Mountains thrust and underlying favorable carbonate rocks where cover conceals this priority targeting criteria across a vast area of interest.

Fourmile, Nevada, USA15

The discovery announced in the third quarter of 2019 was successfully followed up with a hole (FM19-14D) intersecting multiple discontinuous zones of high-grade mineralization over a vertical extent of 250 meters including 3.1 meters at 6.24 g/t, 7.5 meters at 9.22 g/t, 3.1 meters at 47.85 g/t, 3.7 meters at 86.19 g/t, 4.8 meters at 42.48 g/t, and 2.7 meters at 180.36 g/t. The discovery is located about a kilometer north of Fourmile in an area of sparse, 200 to 400 meter spaced, framework drill holes. Follow-up drilling will resume in the second quarter of 2020 following the winter break. Surface mapping and sampling were ongoing during the fourth quarter of 2019. Fieldwork continues to add value, even with target depths often exceeding a kilometer, by highlighting structural controls and geochemical leakage through barren bedrock cover as well as areas requiring framework drilling. Three widely spaced diamond drill holes totaling 4,292 meters were completed during the fourth quarter of 2019.

The focus in 2019 on aggressive advanced target testing resulted in more than doubling the inferred resource at

 

 

BARRICK YEAR-END 2019   75   MANAGEMENT’S DISCUSSION AND ANALYSIS


Fourmile. To achieve this growth, a total of 43 new diamond drill holes totaling 40,712 meters were incorporated into geologic and resource models. The most significant addition was found at the intersection of the steeply west-dipping Anna fault identified from this season’s advanced targeting from the moderately west-dipping Sadler reverse fault and associated fold that has been a key targeting criterion for several seasons. Near this structural intersection, brecciated, metasomatized carbonate rock hosts high-grade mineralization. The zone remains open down-dip to the west as well as along strike. Follow-up drilling will resume in the first quarter of 2020. These new holes will also provide excellent platforms to continue building confidence in the resource by directionally drilling across west-dipping mineralization at a favorable orientation.

With rapid resource growth and the potential significant value associated with high-grade mineralization intersected to date, work supporting geotechnical, geo-metallurgical, hydrological and other characterizations of Fourmile have been initiated. Exploration and technical studies are closely coordinated to leverage as much value as possible from every drill hole. A Fourmile study team will be organized in the first quarter of 2020 to evaluate and de-risk the project. The team will ultimately deliver a feasibility study, key to strategic decisions associated with the project including its possible inclusion into Nevada Gold Mines.

Hemlo, Ontario, Canada

An airborne magnetic survey and surface trenching program was completed during the fourth quarter of 2019. Integrating results from both programs shows a positive correlation between gold and magnetic susceptibility west of the mine. Follow-up will be an important aspect of the 2020 exploration program. Drilling the down plunge extension of the C Zone to assess growth potential was ongoing through the quarter and will continue into 2020. The C-Zone represents most of the current resources and underground mill feed at Hemlo.

Pueblo Viejo, Dominican Republic

Drill testing of targets generated from the first integrated geological model and a renewed understanding on the controls to mineralization was the focus for the quarter. To the southeast of Mejita, a structural control to high grades was established and drill-tested; however, the favorable horizon has been eroded. To the east and northeast of Mejita, historic gold in soil anomalies grading +100ppb Au are in part coincident with the projection of a northeast ore controlling structure from the Moore Pit in an area coincident with newly mapped phreatomagmatic breccias. Drill testing intersected favorable alteration and results are pending. In the first quarter of 2020, we will be applying geophysical techniques to map potential concentrations of sulfides associated with mineralization at Arroyo Hondo and Arroyo del Rey; such surveys were historically successful at mapping sulfide association with the Monte Negro and Moore ore bodies.

Alturas-Del Carmen, Argentina

At Del Carmen, an updated mineral inventory was calculated for Rojo Grande which will contribute to further development studies for the Alturas project in 2020. Mineralization at Rojo Grande is at or near surface and could provide a source of early ore for potential development scenarios at Alturas. Finally, drill testing of four priority litho-structural targets in the Alturas-Del Carmen camp, incorporating newly defined high-

grade controls to mineralization, has commenced in January 2020.

Veladero, Argentina

At Veladero, a large 3.5 x 2.5 km alteration system has been delineated at the Coiron prospect, located to the southwest of the open pits. Mapping and geophysics have identified many characteristics of our known high sulfidation epithermal deposits and suggests a dominantly preserved hydrothermal system. Drill testing has commenced in January 2020. Multiple other brownfields targets are advancing to delineation and drill testing.

Lagunas Norte, Peru

At Lagunas Norte, we completed structural mapping and deep penetrating geophysics which is delineating both oxide and sulfide targets. Encouragingly, the southern extension of the Lagunas Norte Fault has been redefined and opens up potential for further mineralization to the south of the deposit. A drill program has commenced in January 2020 to test this zone.

Drilling was also initiated at the end of the fourth quarter of 2019 on two targets within the district: La Capilla and Antonio Chuco. At La Capilla, outcropping oxide mineralization defined by channel sampling and drilling extends over a 400 m strike. A potential diatreme feeder has been defined, which may extend mineralization over a much larger area. Drilling will test the diatreme concept and delineate the footprint potential of oxide mineralization. This project is less than 10 km east of Lagunas Norte and could provide near-term oxide material. At Antonio Chuco, 20 km south of Lagunas Norte, surface sampling has identified gold mineralization in north-south oriented silicified structures which may also control the emplacement of breccia bodies.

Pascua-Lama, Chile and Argentina

Barrick’s intention is to update our geological understanding of the orebody as part of our strategy to bring Pascua-Lama to account. This process is expected to take a number of years to complete.

The focus in 2020 at Pascua-Lama will be on addressing the gaps identified in the geological and geo-metallurgical understanding of the orebody, building upon the improved 3D geology model completed in 2019. To support this, drilling over the next two summer seasons is being contemplated, which may drive further desktop studies. Additionally, a geological and geo-metallurgical drill program at the Penelope deposit of Lama has been budgeted for 2020. Column testing is also planned to assess the amenability of Penelope ore for heap leaching at Veladero.

Porgera, Papua New Guinea

Focus during the quarter was on designing a drill program targeting the potential mineralization expansion of the open pit, into the Wangima zone. Historical wide-spaced drill results, combined with preliminary geophysical survey responses and surface sampling, indicated the possibility of a continuation of stacked structurally controlled lenses extending along strike within an interpreted intrusive corridor. Barrick plans to execute an exploratory/infill drill program from both surface and underground platforms during 2020 and 2021. The program is geologically designed as multi-phase and will be calibrated as results become available, and the geology is confirmed. Preliminary results support the

 

 

BARRICK YEAR-END 2019   76   MANAGEMENT’S DISCUSSION AND ANALYSIS


extension of both the intrusive corridor and repetition of stacked structures.

Bambadji, Senegal16

At Bambadji, follow-up drilling started testing saprolite anomalies defined through auger drilling under suppressive regolith along the multi-kilometer Gefa-Maliki corridor. Preliminary results confirm bedrock mineralization over the first target tested in the south of the corridor where drill intercepts from the first two RC lines returned 7.0 meters at 16.72 g/t, 30.0 meters at 1.06 g/t and 13.0 meters at 1.31 g/t. Mineralization is hosted within brecciated albitite and fine-medium grained sediments associated with silica, hematite +/- tourmaline and disseminated or patchy pyrite. Results are pending for an extra six lines testing three kilometers of strike length with geological observations suggesting a continuous system past the Gefa Main target and extending a further five kilometers north across the Maliki target, where drilling is currently confirming similar geological findings. Drilling at the Madina target located on the Gounkoto Domain Boundary extension confirmed weak mineralization along northeastern structures propagating within a competent albitite body, but which do not have the potential for economic mineralization. Auger drilling and IP surveys are underway in the northern half of the permit to identify new opportunities to be tested in the second quarter of 2020.

Loulo-Gounkoto, Mali17

At Yalea, step out drilling confirmed the extension of the Transfer Zone over an additional 320 meters towards the South with follow-up drilling planned in the first quarter of 2020 to extend this further. At Loulo 3, resource drilling was completed for the underground opportunity while exploration progressed to the north along the gap zone with Loulo 2, where initial observations show potential for a new open pit. New greenfield targets were generated along the Yalea structure and at the Yalea Ridge, with follow-up planned during the first quarter of 2020. At Gounkoto, exploration in the south of the deposit below the current pit intersected additional high-grade shoots. Follow-up work is planned in the first quarter of 2020 to define if they have the potential to be mined from underground. Exploration on the Faraba Trend has focused on a newly recognized structure which is thought to control mineralization over four kilometers across the Faraba complex. Elsewhere in Mali, generative work is in progress in the Kenieba-Kedougou Inlier and in Mali South with ground being reviewed.

Tongon, Côte d’Ivoire

At Nielle, drilling focused on testing gaps along the Badenou trend with limited success in identifying potential for additional satellite resources. Deeper holes are being drilled at the Mercator target to test the down-dip and plunge potential of higher grade shoots beneath the current pit shells. Sub-surface testing of priority targets in the license area is in progress with follow-up drilling planned in the first quarter of 2020 on the best targets. Following the completion of resource conversion drilling at Djinni, optimization work on the updated model returned positive results with the deposit potentially extending the Tongon life of mine by almost a year at the current production rate. A feasibility study is planned at Djinni in 2020 to bring the deposit into the mining schedule.

Regional Exploration, Côte d’Ivoire

Drilling has been completed across seven priority targets on the Sissedougou and Mankono permits. Results received to

date confirm low- to medium-grade mineralization related to quartz veining hosted within or at the contact with intrusives. Auger drilling is planned to follow potential extensions to some historic targets beneath suppressive regolith in the north of Sissedougou, while soil sampling is covering a major structure in the northeast of the permit. At Boundiali, shallow drilling was completed on the first targets of the Syama corridor, while two more targets remain to be tested before drawing definitive conclusions on the corridor. In southeastern Côte d’Ivoire, stream sampling across the Ketesso area of interest is expected to be completed early in 2020 allowing for the definition of anomalous basins for follow-up.

Kibali, Democratic Republic of Congo18

At Kibali, KCD was the center of activities with further testing of the 12000 lode, a review of the 11000 lode for potential up and down-dip extensions and the start of a deep hole testing the KCD down-plunge extension. At Pakaka and Ikamva, model updates and optimizations are being conducted to assess the potential for underground opportunities following positive drill results received in the third quarter of 2019. Oere was also an area of focus for ounce delivery along the KZ North structure with a third phase of drilling currently in progress to test the potential at depth and along strike. Results to date indicate the potential of a small satellite resource at Oere.

North Mara and Bulyanhulu, Tanzania

The main focus during the quarter was the delivery of an updated geologic model for Gokona underground at North Mara. The new model shows mineralization controlled by rheologic contrasts in the broadly folded host stratigraphy. Mineralization typically occurs along volcanic andesite, intermediate dyke and meta-sediment contacts. Significant upside exists in areas of the system where previous drilling is sub-parallel to these folded contacts as well as along strike in both directions and in the footwall of the deposit. Going forward, takeaways from the new model will be applied to exploration along the highly prospective +20 km long Gokona mineralized trend. At Bulyanhulu, an updated geologic interpretation confirmed the exceptional geologic continuity of this system, as well as a near-surface target that has potential to host plunging shoots of higher grade mineralization.

Jabal Sayid, Kingdom of Saudi Arabia

At Jabal Sayid, target generation work continued through integration and interpretation of historic and new data from the remodeling of lodes 2 and 4. Drill testing of priority targets has started with the first hole investigating the extension of lode 4. To date, this hole has confirmed the continuity of the lithologic and alteration package host to the mineralization. Other brownfield and greenfield targets are being advanced to drill stage with priority targets testing planned for the second quarter of 2020.

 

 

BARRICK YEAR-END 2019   77   MANAGEMENT’S DISCUSSION AND ANALYSIS


REVIEW OF FINANCIAL RESULTS

Revenue

 

($ millions,
except per
ounce/pound
data in dollars)
   For the three
months ended
     For the years ended  
(unaudited)    12/31/19      9/30/19      12/31/19      12/31/18      12/31/17  

Gold 000s oz solda

     1,413        1,318        5,467        4,544        5,302  

000s oz

produceda

     1,439        1,306        5,465        4,527        5,323  

Market price

($/oz)

     1,481        1,472        1,393        1,268        1,257  

Realized

price ($/oz)b

     1,483        1,476        1,396        1,270        1,258  

Revenue

     2,758        2,585        9,186        6,600        7,631  

Copper millions lbs solda

     91        65        355        382        405  

millions lbs

produceda

     117        112        432        383        413  

Market price

($/lb)

     2.67        2.63        2.72        2.96        2.80  

Realized

price ($/lb)b

     2.76        2.55        2.77        2.88        2.95  

Revenue

     82        45        393        512        608  

Other sales

     43        48        138        131        135  

Total revenue

     2,883        2,678        9,717        7,243        8,374  

 

a.

Includes our equity share of gold ounces from Tanzania until September 30, 2019 (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience) and Pueblo Viejo and copper pounds from Zaldívar and Jabal Sayid. Also includes our equity share of gold ounces from Loulo-Gounkoto, Tongon, Kibali and Morila commencing January 1, 2019, the effective date of the Merger. Starting July 1, 2019, it also includes our 61.5% share of Nevada Gold Mines.

b.

Realized price is a non-GAAP financial performance measure with no standardized meaning under IFRS and therefore may not be comparable to similar measures of performance presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 91 to 112 of this MD&A.

2019 gold production of 5.47 million ounces was at the upper end of the guidance range of 5.1-5.6 million ounces and 2019 copper production of 432 million pounds was above the guidance range of 375-430 million pounds.

Q4 2019 compared to Q3 2019

In the fourth quarter of 2019, gold revenues increased by 7% compared to the third quarter of 2019 primarily due to higher sales volume, combined with higher realized gold prices4. The average market price for the three-month period ended December 31, 2019 was $1,481 per ounce versus $1,472 per ounce for the prior quarter. During the fourth quarter of 2019, the gold price ranged from $1,446 per ounce to $1,525 per ounce and closed the quarter at $1,515 per ounce. Gold prices in the quarter were influenced by fluctuations in US Treasury rates and changes in expectations for US benchmark interest rates; movements in the US dollar; economic concerns as a result of global trade disputes; and net purchases from investors and the official sector.

Attributable Gold Production Variance (000s oz)

Q4 2019 compared to Q3 2019

 

LOGO

In the fourth quarter of 2019, attributable gold production was 133 thousand ounces higher than the prior quarter, primarily due to the impact of the acquisition of all of the shares that we did not own of Acacia on September 17, 2019, which resulted in an increase in attributable production at North Mara, Bulyanhulu and Buzwagi to 100% (from 63.9%).    This was combined with the resumption of operations at North Mara after the lifting of the Prohibition Notice late in the third quarter of 2019, higher throughput at Pueblo Viejo due to record sulfur tonnes oxidized following optimization work, partially offset by the sale of our 50% interest in Kalgoorlie (included in the Other category above) on November 28, 2019.

Copper revenues in the fourth quarter of 2019 increased by 82% compared to the prior quarter, primarily due to higher copper sales volume and higher realized copper prices4. The average market price in the fourth quarter of 2019 was $2.67 per pound versus $2.63 per pound in the prior quarter. In the fourth quarter of 2019, the realized copper price4 was higher than the market copper price as a result of the impact of positive provisional pricing adjustments recorded, whereas negative provisional pricing adjustments were recorded in the prior quarter. During the fourth quarter of 2019, the copper price ranged from $2.53 per pound to $2.84 per pound and closed the quarter at $2.79 per pound. Copper prices in the fourth quarter were positively influenced by progress on trade negotiations between the US and China and a further reduction in global stockpiles.

Attributable copper production in the fourth quarter of 2019 increased by 5 million pounds compared to the prior quarter, primarily due to higher throughput and grades at both Zaldívar and Jabal Sayid. In spite of a strong quarter on production, sales were negatively affected by a major refurbishment at one of the third-party smelters that processes a portion of Lumwana’s concentrate. The refurbishment was completed in January 2020. We are evaluating our opportunities with this third-party smelter to steadily sell the concentrate stockpiled during the refurbishment period through the course of the year.

 

 

BARRICK YEAR-END 2019   78   MANAGEMENT’S DISCUSSION AND ANALYSIS


2019 compared to 2018

In 2019, gold revenues increased by 39% compared to the prior year primarily due to the inclusion of production from sites acquired as part of the Merger and due to the formation of Nevada Gold Mines, which commenced on July 1, 2019 and is consolidated and included in revenue at 100%. Excluding the impact of the Merger and the formation of Nevada Gold Mines, gold revenues were in line with the prior year as a decrease in gold sales volumes was largely offset by an increase in realized gold prices4. The average market gold price for 2019 was $1,393 per ounce versus $1,268 per ounce in the prior year.

In 2019, attributable gold production was 938 thousand ounces or 21% higher than the prior year. Excluding the impact of the Merger and the formation of Nevada Gold Mines, gold production for the year decreased by 383 thousand ounces or 8%, mainly due to lower grades mined and processed at Cortez as mining from CHOP was completed in the second quarter of 2019.

Gold Production Variance (000s oz)

year ended December 31, 2019

 

LOGO

Copper revenues for 2019 were down 23% compared to the prior year due to lower realized copper prices4, combined with lower copper sales volume. Copper sales were adversely impacted by a major refurbishment at one of the third-party smelters that processes a portion of Lumwana’s concentrate. In 2019, the realized copper price4 was higher than the market copper price as a result of positive provisional pricing adjustments to copper sales that were subject to finalization in 2019. The 2018 realized copper price4 was lower than the market copper price as a result of negative provisional pricing adjustments, the opposite impact from the current year.

Attributable copper production for 2019 was 13% higher than the prior year, mainly due to the improvements in plant availability and efficiency implemented at Lumwana, as well as higher grade and throughput at Zaldívar following crusher and conveyor issues that occurred in the prior year period.

Production Costs

 

($ millions,
except per ounce/
pound data in
dollars)
   For the three
months ended
     For the years ended  
      12/31/19      9/30/19      12/31/19      12/31/18      12/31/17  

Gold

              

Direct mining costsa

     1,252        1,207        4,274        3,130        3,063  

Depreciation

     549        538        1,902        1,253        1,529  

Royalty expense

     85        79        308        196        206  

Community relations

     10        7        30        42        38  

Cost of sales

     1,896        1,831        6,514        4,621        4,836  

Cost of sales

($/oz)b

     1,046        1,065        1,005        892        794  

Total cash costs ($/oz)c

     692        710        671        588        526  

All-in sustaining costs ($/oz)c

     923        984        894        806        750  

Copper

              

Direct mining costs

     55        30        224        344        274  

Depreciation

     17        13        100        170        83  

Royalty expense

     8        5        34        39        38  

Community relations

     0        1        3        5        4  

Cost of sales

     80        49        361        558        399  

Cost of sales

($/lb)b

     2.26        2.00        2.14        2.40        1.77  

C1 cash costs ($/lb)c

     1.90        1.62        1.69        1.97        1.66  

All-in sustaining costs ($/lb)c

     2.82        2.58        2.52        2.82        2.34  

 

a.

Includes mining and processing costs.

b.

Cost of sales applicable to gold per ounce is calculated using cost of sales applicable to gold on an attributable basis (removing the non-controlling interest of 40% Pueblo Viejo, 36.1% Tanzania until September 30, 2019 (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience) and 40% South Arturo from cost of sales (63.1% of South Arturo from July 1, 2019 onwards as a result of its contribution to Nevada Gold Mines)), divided by attributable gold ounces. The non-controlling interest of 20% Loulo-Gounkoto and 10.3% of Tongon is also removed from cost of sales and our proportionate share of cost of sales attributable to equity method investments (Kibali and Morila) is included commencing January 1, 2019, the effective date of the Merger. Also removes the non-controlling interest of 38.5% Nevada Gold Mines from cost of sales from July 1, 2019 onwards. Cost of sales applicable to copper per pound is calculated using cost of sales applicable to copper including our proportionate share of cost of sales attributable to equity method investments (Zaldívar and Jabal Sayid), divided by consolidated copper pounds (including our proportionate share of copper pounds from our equity method investments).

c.

Total cash costs, C1 cash costs and all-in sustaining costs are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures of performance presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 91 to 112 of this MD&A.

 

 

BARRICK YEAR-END 2019   79   MANAGEMENT’S DISCUSSION AND ANALYSIS


Q4 2019 compared to Q3 2019

In the fourth quarter of 2019, cost of sales applicable to gold was 4% higher compared to the third quarter of 2019 as a result of increased sales volume. Our 45% interest in Kibali and 40% interest in Morila are equity accounted for and therefore we do not include their cost of sales in our consolidated gold cost of sales. On a per ounce basis, cost of sales applicable to gold5, after including our proportionate share of cost of sales at our equity method investees, and total cash costs4 were 2% and 3% lower, respectively, than the prior quarter primarily due to the impact of higher grade and throughput at Pueblo Viejo, partially offset by lower grades at Cortez as the remaining higher grade, low-cost stockpiles from CHOP were processed in the third quarter of 2019.

In the fourth quarter of 2019, gold all-in sustaining costs4 decreased by 6% on a per ounce basis compared to the prior quarter primarily due to lower total cash costs4 as discussed above, combined with lower general and administrative expenses and lower minesite sustaining capital expenditures.

In the fourth quarter of 2019, cost of sales applicable to copper was 63% higher than the prior quarter primarily due to higher copper sales volume at Lumwana as a result of our efforts to sell concentrate through other channels while the major refurbishment at one of the third-party smelters continued. Our 50% interests in Zaldívar and Jabal Sayid are equity accounted for and therefore we do not include their cost of sales in our consolidated copper cost of sales. On a per pound basis, cost of sales applicable to copper5 and C1 cash costs4, after including our proportionate share of cost of sales at our equity method investees, increased by 13% and 17%, respectively, compared to the prior quarter primarily due to more stripping expenditures being expensed rather than capitalized at Zaldívar and Lumwana.

In the fourth quarter of 2019, copper all-in sustaining costs4, which have been adjusted to include our proportionate share of equity method investees, were 9% higher per pound than the prior quarter primarily reflecting higher C1 cash costs4, partially offset by lower minesite sustaining capital expenditures on a per pound sold basis.

2019 compared to 2018

2019 cost of sales applicable to gold5 was $1,005 per ounce compared to our guidance range of $940-$990 per ounce. In 2019, cost of sales applicable to gold was 41% higher than the prior year primarily due to increased sales volume resulting from the Merger and the formation of Nevada Gold Mines. Excluding the impact of the Merger and Nevada Gold Mines, cost of sales applicable to gold was 3% lower compared to the prior year, in line with the change in production after adjusting for the impact of the Merger and Nevada Gold Mines. On a per ounce basis, cost of sales applicable to gold5, after including our proportionate share of cost of sales at our equity method investees, was 13% higher than the prior year primarily due to higher depreciation on a per ounce basis as a result of the fair value increments applied to our interests in the legacy Randgold and Nevada Gold Mines operations. Total cash costs per ounce4 increased by 14% compared to the same prior year period primarily due to the impact of lower grades processed from Cortez and higher export duties and royalties at Veladero.

Gold total cash costs4 and all-in sustaining costs4 for 2019 were $671 and $894 per ounce, respectively, both within the guidance ranges of $650-$700 and $870-$920 per ounce. In 2019, gold all-in sustaining costs per ounce4 increased by 11% compared to the prior year primarily due to higher total cash costs4 as discussed above, combined with higher minesite sustaining capital expenditures on a per ounce basis, partially offset by lower general and administrative expenses.

2019 cost of sales applicable to copper5 and C1 cash costs4 were $2.14 and $1.69 per pound, both below our guidance ranges of $2.30-$2.70 and $1.70-$2.00 per pound, respectively. In 2019, cost of sales applicable to copper was 35% lower than the prior year, primarily due to the impact of lower copper sales volume at Lumwana, as sales were negatively affected by a major refurbishment at one of the third-party smelters that processes a portion of Lumwana’s concentrate. The refurbishment was completed in January 2020. We are evaluating our opportunities with this third-party smelter to steadily sell the concentrate stockpiled during the refurbishment period through the course of the year. Our 50% interests in Zaldívar and Jabal Sayid are equity accounted for and therefore we do not include their cost of sales in our consolidated copper cost of sales. On a per pound basis, cost of sales applicable to copper5 and C1 cash costs4, after including our proportionate share of cost of sales at our equity method investees, decreased by 11% and 14%, respectively, compared to the prior year primarily due to the fundamental and sustainable improvements in plant availability and operational efficiency initiatives implemented at Lumwana.

2019 copper all-in sustaining costs4, which have been adjusted to include our proportionate share of equity method investments, were $2.52 per pound, at the lower end of our guidance range of $2.40-$2.90 per pound. Copper all-in sustaining costs4 were 11% lower than the prior year primarily reflecting the lower total C1 cash costs4, partially offset by higher minesite sustaining capital expenditures on a per pound basis.

 

 

BARRICK YEAR-END 2019   80   MANAGEMENT’S DISCUSSION AND ANALYSIS


Capital Expendituresa

 

($ millions)    For the three
months ended
     For the years ended  
(unaudited)    12/31/19      9/30/19      12/31/19      12/31/18      12/31/17  

Minesite sustainingb

     394        406        1,320        968        1,116  

Project capital expendituresc

     46        96        370        425        280  

Capitalized interest

     6        0        11        7        0  

Total consolidated capital expenditures

     446        502        1,701        1,400        1,396  

Attributable capital expendituresd

     393        397        1,512        1,363        1,314  

2019 Attributable capital expenditures guidanced

                      

$1,400

to

$1,700

 

 

 

                 

 

a.

These amounts are presented on a 100% cash basis, except for attributable capital expenditures.

b.

Includes both minesite sustaining and mine development.

c.

Project capital expenditures (on an accrued basis until December 31, 2018, and on a cash basis thereafter) are included in our calculation of all-in costs, but not included in our calculation of all-in sustaining costs.

d.

These amounts are presented on the same basis as our guidance and include our 60% share of Pueblo Viejo and South Arturo (36.9% of South Arturo from July 1, 2019 onwards as a result of its contribution to Nevada Gold Mines), our 63.9% share of Tanzania until September 30, 2019 (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience) and our 50% share of Zaldívar and Jabal Sayid. Also includes our 80% share of Loulo-Gounkoto, 89.7% share of Tongon, 45% share of Kibali and 40% share of Morila commencing January 1, 2019, the effective date of the Merger. Starting July 1, 2019, it also includes our 61.5% share of Nevada Gold Mines.

Q4 2019 compared to Q3 2019

In the fourth quarter of 2019, total consolidated capital expenditures on a cash basis decreased by 11% compared to the third quarter of 2019, primarily due to lower project capital expenditures of 52%, combined with a decrease in minesite sustaining capital expenditures of 3%. Lower project capital expenditures are mainly attributed to Cortez due to decreases at the Cortez Hills Underground Rangefront project and the change in classification of the Crossroads open pit project. Crossroads transitioned to production status late in the third quarter of 2019 from pre-production prior to that. As such, lower project capital expenditures are attributable to this transition resulting in a change in the classification of capital expenditures from project to sustaining. The decrease in minesite sustaining capital expenditures is the result of lower stripping costs capitalized at Loulo-Gounkoto, partially offset by the change in classification of the Crossroads open pit project as discussed above.

2019 compared to 2018

In 2019, total consolidated capital expenditures on a cash basis increased by 22% compared to the prior year, primarily due to the impact of the sites acquired as part of the Merger and from Nevada Gold Mines, which commenced on July 1, 2019, and is consolidated and included at 100%. Excluding the impact of the Merger and the formation of Nevada Gold Mines, capital expenditures decreased by 4% mainly due to lower project capital expenditures at Cortez due to decreasing

Crossroads dewatering activities and Rangefront project expenditures, while minesite sustaining capital expenditures remained in line with the prior year.

2019 compared to Outlook

Attributable capital expenditures for 2019 of $1,512 million were at the lower end of the guidance range of $1,400 to $1,700 million.

General and Administrative Expenses

 

($ millions)    For the three
months ended
     For the years ended  
(unaudited)    12/31/19      9/30/19      12/31/19      12/31/18      12/31/17  

Corporate administrationa

     26        39        148        212        201  

Share-based compensationb

     5        13        37        27        26  

Tanzaniac

     0        16        27        26        21  

General & administrative expenses

     31        68        212        265        248  

2019 General & administrative expenses guidance

                       ~$200                    

 

a.

For the three months and year ended December 31, 2019, corporate administration costs include approximately $nil and $18 million, respectively, of severance costs (September 30, 2019: $3 million; 2018 $63 million; 2017: $3 million).

b.

Based on US$18.59 share price as at December 31, 2019 (September 30, 2019: US$17.33; 2018: US$13.54; 2017: $14.47) and excludes share-based compensation relating to Tanzania.

c.

Formerly known as Acacia Mining plc. This line includes severance costs of approximately $13 million and $15 million, for the three months and year ended December 31, 2019, respectively.

Q4 2019 compared to Q3 2019

In the fourth quarter of 2019, general and administrative expenses decreased by $37 million compared to the third quarter of 2019 primarily due to severance costs incurred by Tanzania resulting from the closure of Acacia’s London and Johannesburg offices that occurred in the prior quarter. This was combined with lower corporate administration expenses of $13 million mainly due to cost reductions and lower short-term incentive accruals during the quarter. This was further impacted by lower share-based compensation of $8 million mainly resulting from a more modest increase in our share price during the fourth quarter of 2019 compared to the increase in the prior quarter.

2019 compared to 2018

General and administrative expenses decreased by $53 million compared to the prior year due to lower corporate administration expenses attributed to the organizational reductions related to both the implementation of the decentralized operating model in the prior year and the Merger in the current period. This was partially offset by higher share-based compensation resulting from higher share prices compared to the prior year.

2019 compared to Outlook

Exclusive of severance costs of $33 million, general and administrative expenses were lower than guidance of ~$200 million. Corporate administration expenses of $130 million (excluding severances of $18 million) were below guidance of ~$140 million, highlighting the benefit of cost reduction activities during the year and the implementation of our flat, operationally focused, agile management structure.

 

 

BARRICK YEAR-END 2019   81   MANAGEMENT’S DISCUSSION AND ANALYSIS


Exploration, Evaluation and Project Costs

 

($ millions)    For the three
months ended
     For the years ended  
(unaudited)    12/31/19      9/30/19      12/31/19      12/31/18      12/31/17  

Global exploration and evaluation

     33        34        143        121        126  

Advanced project costs:

              
 

Pascua-Lama

     11        13        49        77        122  
 

Other

     6        5        20        36        14  

Corporate development

     10        11        51        60        13  

Business improvement and innovation

     0        1        10        44        32  

Minesite exploration and evaluation

     24        22        69        45        47  

Total exploration, evaluation and project expenses

     84        86        342        383        354  

2019 total E&E and project expenses guidance

                      

$280

to

$340

 

 

 

                 

Q4 2019 compared to Q3 2019

Exploration, evaluation and project expenses for the fourth quarter of 2019 were in line with the prior quarter.

2019 compared to 2018

Exploration, evaluation and project costs for 2019 decreased by $41 million compared to the prior year. This was due to lower advanced project costs, primarily at Pascua-Lama, and lower business improvement and innovation costs as a result of digitization initiatives occurring in the prior year. This was partially offset by an increase in minesite exploration and evaluation expenses at Nevada Gold Mines and higher global exploration and evaluation expenses mainly due to the expansion project at Pueblo Viejo.

2019 compared to Outlook

Exploration, evaluation and project costs for 2019 were marginally above the top end of the guidance range of $280 to $340 million. This was due to higher exploration and evaluation expenditures, which were above the guidance range of $170 to $180 million, marginally offset by lower project expenditure, which was at the lower end of the $120 to $150 million range.

Finance Costs, Net

 

($ millions)    For the three
months ended
    For the years ended  
(unaudited)    12/31/19     9/30/19     12/31/19     12/31/18     12/31/17  

Interest expensea

     104       112       435       452       511  

Accretion

     16       19       75       87       67  

Loss on debt extinguishment

     0       3       3       29       127  

Interest capitalized

     (6     (3     (14     (9     0  

Other finance costs

     5       (2     1       1       0  

Finance income

     (13     (4     (31     (15     (14

Finance costs, net

     106       125       469       545       691  

2019 finance costs, net guidance

                    

$500

to

$550

 

 

 

               
  a.

For the three months and year ended December 31, 2019, interest expense includes approximately $28 million and $103 million, respectively, of non-cash interest expense relating to the gold and silver streaming agreements with Wheaton Precious Metals Corp. and Royal Gold, Inc. (September 30, 2019: $25 million; 2018: $98 million; 2017: $101 million).

Q4 2019 compared to Q3 2019

In the fourth quarter of 2019, net finance costs were 15% lower than the prior quarter, mainly due to an increase in finance income resulting from the unwinding of the discount related to a prepaid long-term royalty at Carlin which was recorded at its fair value on the formation of Nevada Gold Mines.

2019 compared to 2018

In 2019, net finance costs were 14% lower than the prior year primarily due to a decrease in loss on debt extinguishment and lower interest expense, both attributable to debt reductions we have made over the preceding 18 months. The loss on debt extinguishment in 2019 relates to the make-whole repurchase of the outstanding $248 million of principal of our 4.95% notes due 2020 in July 2019. For 2018, the loss on debt extinguishment relates to the make-whole repurchase of the remaining $629 million of principal on the 4.40% Notes due 2021 in July 2018, which also resulted in a decrease in interest expense compared to the prior year.

2019 compared to Outlook

Net finance costs for 2019 were below the guidance range of $500 to $550 million. This was due to higher finance income and lower accretion expense on our environmental rehabilitation provisions.

 

 

BARRICK YEAR-END 2019   82   MANAGEMENT’S DISCUSSION AND ANALYSIS


Additional Significant Statement of Income Items

 

($ millions)    For the three
months ended
    For the years ended  
(unaudited)    12/31/19     9/30/19     12/31/19     12/31/18      12/31/17  

Impairment charges (reversals)

     (566     (872     (1,423     900        (212

Loss on currency translation

     53       40       109       136        72  

Other expense (income)

     (1,282     (1,852     (3,100     90        (799

Impairment Charges (Reversals)

 

($ millions)    For the three
months ended
    For the years ended  
(unaudited)    12/31/19     9/30/19     12/31/19     12/31/18     12/31/17  
 
     

Post-tax

(our
share)

   

Post-tax

(our

share)

   

Post-tax

(our

share)

   

Post-tax

(our

share)

   

Post-tax

(our

share)

 

Asset impairments (reversals)

          
 
Lumwana      0       (663     (663     0       (259
 
Pueblo Viejo      (277     0       (277     0       0  
 
Pascua-Lama      296       0       296       (7     407  
 
Nevada Gold Mines      0       46       48       11       0  
 
Lagunas Norte      0       11       12       405       2  
 
Veladero      0       0       2       160       0  
 
Equity method investments      0       0       0       30       0  
 
Acacia exploration sites      0       0       0       17       0  
 
Cerro Casale      0       0       0       0       (518
 
Bulyanhulu      0       0       0       0       350  
 
Golden Sunlight      0       0       0       0       2  
 
Exploration sites      0       0       0       0       8  
 
Other      3       4       14       29       1  

Total asset impairment charges (reversals)

     22       (602     (568     645       (7

Goodwill

                                        
 
Veladero      0       0       0       154       0  

Total goodwill impairment charges

     0       0       0       154       0  

Tax effects and NCI

     (588     (270     (855     101       (205

Total impairment charges (reversals)

     (566     (872     (1,423     900       (212

Impairment Charges (Reversals)

Q4 2019 compared to Q3 2019

In the fourth quarter of 2019, net impairment charges were $22 million (net of tax and non-controlling interests) compared to reversals of $602 million (net of tax and non-controlling interests) in the prior quarter. The net impairment charge in the fourth quarter of 2019 mainly relates to a charge of $296 million (no tax impact) at Pascua-Lama, as we completed a

study of the Pascua-Lama project and concluded that we do not have a plan that meets our investment criteria under our current assumptions. This was partially offset by net impairment reversals at Pueblo Viejo of $277 million net of tax and non-controlling interest ($865 million pre-tax and non-controlling interest), reflecting the progression of our engineering and evaluation work on the process plant expansion and additional tailings facility. In conjunction with the increase in the long-term gold price assumption, this has resulted in an improvement in the life of mine cash flows for the mine site. In the third quarter of 2019, the net impairment reversal relates to a reversal at Lumwana of $663 million net of tax ($947 million pre-tax), partially offset by impairments of land holdings and CHOP infrastructure assets at Cortez.

2019 compared to 2018

In 2019, we recognized $568 million (net of tax and non-controlling interests) of net impairment reversals for non-current assets. This was mainly at Lumwana: $663 million net of tax ($947 million pre-tax) as a result of significant reductions achieved in the current year in unit mining costs and improvements in plant availability reflected in our updated life of mine plan, combined with an increase in our long-term copper price assumption of $3.00 per pound from $2.85 per pound. In addition, we recognized $277 million net of tax and non-controlling interest ($865 million pre-tax and non-controlling interest) of net impairment reversals at Pueblo Viejo, reflecting the progression of our engineering and evaluation work on the process plant expansion and additional tailings facility in conjunction with the increase in the long-term gold price assumption. This was partially offset by net impairment charges of $296 million (no tax impact) at Pascua-Lama, as we completed a study of the Pascua-Lama project and concluded that we do not have a plan that meets our investment criteria under our current assumptions.

Loss on Currency Translation

Q4 2019 compared to Q3 2019

Loss on currency translation in the fourth quarter of 2019 was $53 million compared to $40 million in the prior quarter. The increase was primarily due to the revaluation of a Zambian tax settlement, partially offset by lower unrealized foreign currency translation losses resulting from a modest depreciation of the Argentine peso in the current quarter versus a significant depreciation in the prior quarter. This currency depreciation resulted in the revaluation of our peso denominated value-added tax receivable balances. During the fourth quarter of 2019, the Argentine peso continued to weaken versus the US dollar due in part to high inflation.

2019 compared to 2018

Loss on currency translation for 2019 decreased by $27 million compared to the prior year. The decrease was primarily due to continued unrealized foreign currency translation losses relating to the Argentine peso, but from a lower asset base in 2019 versus 2018. The peso has significantly depreciated in both periods and has revalued our peso denominated value-added tax receivable balances. After modest appreciation of the Argentine peso in the second quarter of 2019, the impact of inflation and political uncertainty in Argentina experienced in the third and fourth quarters of 2019 has driven a return to the general trend in recent years of a weakening peso versus the US dollar.

 

 

BARRICK YEAR-END 2019   83   MANAGEMENT’S DISCUSSION AND ANALYSIS


Other Expense (Income)

Q4 2019 compared to Q3 2019

In the fourth quarter of 2019, other income was $1,282 million compared to $1,852 million in the prior quarter. Other income in the fourth quarter of 2019 mainly relates to a $628 million gain on the de-recognition of the deferred revenue liability relating to our silver sale agreement with Wheaton Precious Metals Corp. Other income in the fourth quarter of 2019 also includes a gain of $408 million resulting from the sale of our 50% interest in Kalgoorlie, and a gain of $216 million on a tax settlement at Lumwana. Other income in the third quarter of 2019 mainly related to the gain on the remeasurement of Barrick’s 75% interest in Turquoise Ridge to fair value as a result of its contribution to Nevada Gold Mines. Refer to note 4 to the Financial Statements for more information.

2019 compared to 2018

Other income was $3,100 million in 2019 compared to an expense of $90 million in the prior year. In 2019, we recognized a gain of $1,886 million relating to the remeasurement of Barrick’s 75% interest in Turquoise Ridge to fair value as a result of its contribution to Nevada Gold Mines, and a $628 million gain on the de-recognition of the deferred revenue liability relating to our silver sale agreement with Wheaton Precious Metals Corp. This was further impacted by a gain of $408 million resulting from the sale of our 50% interest in Kalgoorlie, and a gain of $216 million on a tax settlement at Lumwana. In 2018, we recognized $68 million of litigation fees, which primarily consists of legal fees at Acacia, and the settlement of a dispute regarding a historical supplier contract acquired as part of the Equinox acquisition in 2011; $51 million of write-offs, which relates primarily to the write-off of a Western Australia long-term stamp duty receivable; and $13 million related to an insurance payment to our Porgera JV. This was partially offset by a $45 million gain on the sale of a non-core royalty asset at Acacia, and $24 million of insurance proceeds received at Kalgoorlie.

Income Tax Expense

Income tax expense was $1,783 million in 2019. The underlying effective tax rate for ordinary income in 2019 was 34% after adjusting for the impact of the change in accounting for the Wheaton Precious Metals Corp. silver streaming agreement; the accounting gain on disposal of Turquoise Ridge; the profit on sale of Kalgoorlie; the net impact of foreign currency translation losses on deferred tax balances; the impact of impairment charges (reversals); the impact of debt extinguishment costs; the impact of asset sales and non-hedge derivatives; the impact of non-deductible foreign exchange losses; the impact of accruing for US withholding tax; and the impact of other expense adjustments. The unadjusted tax rate for income in 2019 was 28% of the loss before income taxes.

We record deferred tax charges or credits if changes in facts or circumstances affect the estimated tax basis of assets and therefore the amount of deferred tax assets or liabilities to reflect changing expectations in our ability to realize deferred tax assets. The interpretation of tax regulations and legislation and their application to our business is complex and subject to change. We have significant amounts of deferred tax assets, including tax loss carry forwards, and also deferred tax liabilities. We have significant amounts of unrecognized deferred tax assets (e.g. for tax losses in Canada). Potential changes of any of these amounts, as well as our ability to

realize deferred tax assets, could significantly affect net income or cash flow in future periods.

 

Reconciliation to Canadian Statutory Rate  
For the years ended    12/31/19     12/31/18  

At 26.5% statutory rate

     1,684       (63

Increase (decrease) due to:

    

Allowances and special tax deductionsa

     (129     (59

Impact of foreign tax ratesb

     (264     (4

Expenses not tax deductible

     78       74  

Impairment charges not recognized in deferred tax assets

     45       168  

Goodwill impairment charges not tax deductible

     0       54  

Net currency translation losses on deferred tax balances

     43       41  

Tax impact from pass-through entities and equity accounted investments

     (140     (15

Current year tax losses not recognized in deferred tax assets

     8       100  

Sale of 50% interest in Kalgoorlie

     12       0  

De-recognition of deferred tax assets

     4       814  

United States adjustment to one-time toll charge

     0       (49

Adjustments in respect of prior years

     (13     3  

Increase to income tax related contingent liabilities

     21       0  

Dominican Republic tax audit

     0       42  

Impact of tax rate changes

     (35     0  

United States withholding taxes

     30       (107

Other withholding taxes

     24       14  

Mining taxes

     412       184  

Other items

     3       1  

Income tax expense

     1,783       1,198  

 

a.

We are able to claim certain allowances and tax deductions unique to extractive industries that result in a lower effective tax rate.

b.

We operate in multiple foreign tax jurisdictions that have tax rates different than the Canadian statutory rate.

The more significant items impacting income tax expense in 2019 and 2018 include the following:

Currency Translation

Deferred tax balances are subject to remeasurement for changes in currency exchange rates each period. This is required in countries where tax is paid in local currency and accounts are prepared in local GAAP. The most significant balances are Argentine deferred tax liabilities. In 2019 and 2018, tax expense of $75 million and $41 million, respectively, primarily arose from translation losses due to the weakening of the Argentine peso against the US dollar. These translation losses are included within deferred tax expense (recovery). In 2019, deferred tax balances for legacy Randgold assets in Mali and Côte d’Ivoire required remeasurement at year end.

De-recognition of Deferred Tax Assets

In the fourth quarter of 2018, we recorded a deferred tax expense of $673 million related to de-recognition of the deferred tax asset in Canada, and a deferred tax expense of $141 million related to de-recognition of the deferred tax asset in Peru. The de-recognition of the deferred tax asset in Canada follows the Merger and management’s focus on growing the business globally, particularly on our Tier One Gold Assets1 which are outside of Canada. This required us

 

 

BARRICK YEAR-END 2019   84   MANAGEMENT’S DISCUSSION AND ANALYSIS


to reassess the level of repatriated earnings expected in Canada, and Canadian income thereon to support the deferred tax asset. The de-recognition of the deferred tax asset does not constrain our ability to use Canadian carry forward tax losses against future income in Canada; however, we did not expect to be able to use these losses in the foreseeable future as a result of the change in strategy in the fourth quarter of 2018. The de-recognition of the deferred tax asset in Peru in the fourth quarter of 2018 follows management’s review of expected future earnings. The associated impairment of inventory at Lagunas Norte was also driven by the change in the fourth quarter of 2018 in our expected approach to financing future reclamation activities in Peru. Based on these reviews in Canada and Peru, it was determined that the realization of these deferred tax assets was no longer probable.

United States Withholding Taxes

In the fourth quarter of 2018, primarily due to restructuring associated with the Merger, we concluded that going forward, we would reinvest our future undistributed earnings of our United States subsidiaries indefinitely. As a result of our reassessment, we recorded a deferred tax recovery of $107 million.

In 2019, we reassessed our intentions on the current and future undistributed earnings of our United States subsidiaries due to the formation of Nevada Gold Mines. Based on the free cash flow that we expect Nevada Gold Mines to generate, together with other factors, we concluded that it was no longer our intent to indefinitely reinvest our current and future undistributed earnings of our United States subsidiaries. Therefore in the fourth quarter of 2019, we recognized an increase in our income tax provisions in the amount of $30 million, representing withholding tax on undistributed United States earnings.

Framework for former Acacia Operations in Tanzania

On October 20, 2019, Barrick announced that it had reached an agreement with the Government of Tanzania (“GoT”) to settle all disputes between the GoT and the mining companies formerly operated by Acacia but now managed by Barrick. The final agreements were submitted to the Tanzanian Attorney General for review and legalization.

On January 24, 2020, Barrick announced that the Company had ratified the creation of Twiga at a signing ceremony with the President of Tanzania, formalizing the establishment of a joint venture between Barrick and the GoT and resolution of all outstanding disputes between Barrick and the GoT, including the lifting of the previous concentrate export ban, effective immediately.

The terms of the signed agreement are consistent with those previously announced, including the payment of $300 million to settle all outstanding tax and other disputes (the “Settlement Payment”); the lifting of the concentrate export ban; the sharing of future economic benefits from the mines on a 50/50 basis; and a dispute resolution mechanism that provides for binding international arbitration. The 50/50 division of economic benefits will be maintained through an annual true-up mechanism, which will not account for the Settlement Payment.

The Settlement Payment will be paid in installments, with an initial payment of $100 million to the GoT following the resumption of mineral concentrate exports. Five subsequent annual payments of $40 million each will be made, starting on the first anniversary of the fulfillment of all conditions of the signed agreement, subject to certain cash flow conditions.

A tax provision of $128 million had been recorded prior to December 31, 2016 in respect of tax disputes related to Acacia. Of this amount, $70 million was recorded in 2016. In the third quarter of 2017, an additional amount of $172 million was recorded as current tax expense.

Zambian Tax Matters

The mining taxes assessed to the Lumwana Mine have contradicted the Development Agreement that was finalized between Lumwana Mining Company Limited (“LMC”) and the Government of Zambia on December 16, 2005. In 2015, the Company began to take steps to preserve its rights under the Development Agreement and started to engage in formal discussions with the government to redress historical tax issues relating to the Development Agreement. On October 3, 2018, a deed of settlement was signed by the Government of Zambia and LMC. The deed provided that, within 30 days of the deed, LMC shall file tax returns for 2012 through 2017, and the government shall have the right to conduct and complete an audit of the returns. The audit of these tax returns by the Zambian tax authority was completed in the fourth quarter of 2019 and we recorded a $50 million asset reflecting the final settlement of this matter. We also released historical accruals resulting in a total of $216 million recognized in Other Income in 2019.

 

 

BARRICK YEAR-END 2019   85   MANAGEMENT’S DISCUSSION AND ANALYSIS


FINANCIAL CONDITION REVIEW                     
Summary Balance Sheet and Key Financial Ratios                  
($ millions, except ratios and share amounts)
(unaudited)
   As at December 31, 2019      As at December 31, 2018      As at December 31, 2017  

Total cash and equivalents

     3,314        1,571        2,234  

Current assets

     3,573        2,407        2,450  

Non-current assets

     37,505        18,653        20,624  

Total Assets

     44,392        22,631        25,308  

Current liabilities excluding short-term debt

     1,904        1,625        1,688  

Non-current liabilities excluding long-term debta

     7,125        5,883        6,130  

Debt (current and long-term)

     5,536        5,738        6,423  

Total Liabilities

     14,565        13,246        14,241  

Total shareholders’ equity

     21,432        7,593        9,286  

Non-controlling interests

     8,395        1,792        1,781  

Total Equity

     29,827        9,385        11,067  

Total common shares outstanding (millions of shares)b

     1,778        1,168        1,167  

Key Financial Ratios:

                          

Current ratioc

     3.02:1        2.38:1        2.68:1  

Debt-to-equityd

     0.19:1        0.61:1        0.58:1  

 

  a.

Non-current financial liabilities as at December 31, 2019 were $5,656 million (2018: $6,201 million; 2017: $6,844 million).

  b.

Total common shares outstanding do not include 0.3 million stock options.

  c.

Represents current assets (excluding assets held-for-sale) divided by current liabilities (including short-term debt and excluding liabilities held-for-sale) as at December 31, 2019, December 31, 2018 and December 31, 2017.

  d.

Represents debt divided by total shareholders’ equity (including minority interest) as at December 31, 2019, December 31, 2018, and December 31, 2017.

 

Balance Sheet Review

Total assets were $44.4 billion at December 31, 2019, approximately $21.8 billion higher than at December 31, 2018, primarily reflecting the impact of the sites acquired and asset values restated to fair value in connection with the formation of Nevada Gold Mines on July 1, 2019. These sites are consolidated at 100%. The increase in total assets also reflects the $7.9 billion Merger.

Our asset base is primarily comprised of non-current assets such as property, plant and equipment and goodwill, reflecting the capital-intensive nature of the mining business and our history of growth through acquisitions. Other significant assets include production inventories, indirect taxes recoverable and receivable, concentrate sales receivables, other government transaction and joint venture related receivables, and cash and equivalents.

Total liabilities at December 31, 2019 were $14.6 billion, approximately $1.3 billion higher than at December 31, 2018, also reflecting the impact of the formation of Nevada Gold Mines and the Merger. This was combined with the resulting increase in deferred income tax liabilities. Our liabilities are primarily comprised of debt, other non-current liabilities such as provisions and deferred income tax liabilities, and accounts payable.

 

   Shareholders’ Equity       

As at 2/4/2020

     Number of shares  

Common shares

     1,777,926,611  

Stock options

     277,732  

As a result of the Merger, 583,669,178 Barrick common shares were issued to the former Randgold shareholders. On

September 17, 2019, we issued 24,836,670 common shares to the minority shareholders of Acacia in exchange for their shares in Acacia.

Financial Position and Liquidity

Total cash and cash equivalents as at December 31, 2019 were $3.3 billion. Our capital structure comprises a mix of debt, non-controlling interest (primarily at Nevada Gold Mines) and shareholders’ equity. As at December 31, 2019, our total debt was $5.5 billion (debt net of cash and equivalents was $2.2 billion) and our debt-to-equity ratio was 0.19:1. This compares to debt as at December 31, 2018 of $5.7 billion (debt net of cash and cash equivalents was $4.2 billion), and a debt-to-equity ratio of 0.61:1.

On January 31, 2020, we completed a make-whole repurchase of the outstanding $337 million of principal of the 3.85% notes due 2022, which has reduced our total debt to approximately $5.2 billion subsequent to year end.

We currently have less than $40 million in debt due before 2021, and approximately $5 billion of our outstanding debt matures after 2032. In November 2019, we amended and restated the credit and guarantee agreement (the “Credit Facility”) with certain lenders, which requires such lenders to make available to us a credit facility of $3.0 billion or the equivalent amount in Canadian dollars. The Credit Facility, which is unsecured, currently has an interest rate of London Interbank Offered Rate (“LIBOR”) plus 1.25% on drawn amounts, and a commitment rate of 0.15% on undrawn amounts. As part of the amendment and restatement, the termination date of the Credit Facility was extended from January 2024 to January 2025. The Credit Facility is undrawn as at December 31, 2019.

 

 

BARRICK YEAR-END 2019   86   MANAGEMENT’S DISCUSSION AND ANALYSIS


In 2020, we have capital commitments of $155 million and expect to incur attributable sustaining and project capital expenditures of approximately $1,600 to $1,900 million in 2020 based on our guidance range on page 43. In 2020, we have $323 million in interest payments and other amounts as detailed in the table on page 89. In addition, we have contractual obligations and commitments of $473 million in purchase obligations for supplies and consumables. We expect to fund these commitments through operating cash flow, which is our primary source of liquidity, as well as existing cash balances.

Our operating cash flow is dependent on the ability of our operations to deliver projected future cash flows. The market prices of gold, and to a lesser extent copper, are the primary drivers of our operating cash flow. Other options to enhance liquidity include further portfolio optimization and the creation of new joint ventures and partnerships; issuance of equity securities in the public markets or to private investors, which could be undertaken for liquidity enhancement and/or in connection with establishing a strategic partnership; issuance of long-term debt securities in the public markets or to private investors (Moody’s and S&P currently rate Barrick’s outstanding long-term debt as investment grade, with ratings of Baa2 and BBB, respectively); and drawing on the $3.0 billion available under our undrawn Credit Facility (subject to compliance with covenants and the making of certain representations and warranties, this facility is available for drawdown as a source of financing). The key financial covenant in our undrawn Credit Facility requires Barrick to maintain a net debt to total capitalization ratio of less than 0.60:1. Barrick’s net debt to total capitalization ratio was 0.07:1 as at December 31, 2019 (0.31:1 as at December 31, 2018).

Summary of Cash Inflow (Outflow)              
($ millions)    For the three
months ended
    For the years ended  
(unaudited)    12/31/19     9/30/19     12/31/19     12/31/18     12/31/17  

Net cash provided by operating activities

     875       1,004       2,833       1,765       2,065  

Investing activities

          

Capital expenditures

     (446     (502     (1,701     (1,400     (1,396

Cash acquired in Merger

     0       0       751       0       0  

Divestitures

     750       0       750       0       0  

Cash received from equity method investments

     113       72       217       0       0  

Other

     (55     47       33       (94     1,059  

Total investing inflows (outflows)

     362       (383     50       (1,494     (337

Financing activities

          

Net change in debta

     (6     (269     (309     (687     (1,533

Dividendsb

     (87     (67     (548     (125     (125

Net (disbursements) funding to non-controlling interests

     (236     (31     (281     (84     (126

Other

     1       (2     (1     (29     (102

Total financing inflows (outflows)

     (328     (369     (1,139     (925     (1,886

Effect of exchange rate

     0       0       (1     (9     3  

Increase (decrease) in cash and equivalents

     909       252       1,743       (663     (155
a.

The difference between the net change in debt on a cash basis and the net change on the balance sheet is due to changes in non-cash charges, specifically the unwinding of discounts and amortization of debt issue costs.

b.

For the three months ended December 31, 2019, we declared and paid dividends in US dollars totaling $0.05 per share. For the year ended December 31, 2019, we declared and paid $0.13 and $0.20 per share to Barrick shareholders, respectively (September 30, 2019: declared and paid $0.04 per share; 2018: declared $0.19 per share and paid $0.12 per share; 2017: declared and paid $0.12 per share). Dividends paid for the year ended December 31, 2019 also includes $2.69 per share to Randgold shareholders (2018: nil; 2017: nil).

Q4 2019 compared to Q3 2019

In the fourth quarter of 2019, we generated $875 million in operating cash flow, compared to $1,004 million in the prior quarter. The decrease of $129 million was primarily due to an increase in interest paid as a result of the timing of payments on our long-term debt (generally paid semi-annually). This was partially offset by an increase in gold and copper sales volumes, higher gold and copper realized prices4, and lower gold cost of sales per ounce5.

Cash inflows from investing activities in the fourth quarter of 2019 were $362 million, compared to cash outflows of $383

 

 

BARRICK YEAR-END 2019   87   MANAGEMENT’S DISCUSSION AND ANALYSIS


million in the prior quarter. The increase was primarily due to the sale of our 50% interest in Kalgoorlie for cash consideration of $750 million.

Net financing cash outflows for the fourth quarter of 2019 amounted to $328 million, compared to $369 million in the prior quarter. The decrease of $41 million is primarily due to the make-whole repurchase of our 4.95% notes due 2020 in July 2019 occurring in the prior quarter. This was partially offset by an increase in disbursements to non-controlling interests.

2019 compared to 2018

In 2019, we generated $2,833 million in operating cash flow, compared to $1,765 million in the prior year. The increase of $1,068 million was primarily due to higher gold sales volume and higher gold realized prices4, partially offset by higher gold cost of sales per ounce5.

Cash inflows from investing activities for 2019 were $50 million compared to an outflow of $1,494 million in the prior year. The increase was primarily due to cash acquired of $751 million

as a result of the Merger and total cash consideration received of $750 million relating to the sale of our 50% interest in Kalgoorlie. This was combined with dividends received and shareholder loan repayments from equity method investments of $217 million, and lower investment purchases of $155 million. The investing inflows more than offset an increase in capital expenditures in the current year.

Net financing cash outflows for 2019 amounted to $1,139 million, compared to $925 million in the prior year. The higher outflows are primarily due to increased dividend payments. This was due to the first quarter 2019 payment of dividends declared in the fourth quarter of 2018 by Barrick and Randgold of $67 million and $256 million, respectively. This was combined with an increase in dividends declared starting in the first quarter of 2019, reflecting Barrick’s profitability and financial strength and is in line with the commitment to shareholder returns when the Merger was announced. Net financing cash outflows were also impacted by an increase in disbursements to non-controlling interests, partially offset by lower debt repayments during the year.

 

 

Summary of Financial Instruments              
As at December 31, 2019
(unaudited)
                
Financial Instrument    Principal/Notional Amount         Associated Risks
         Interest rate

Cash and equivalents

   $3,314   million     Credit
         Credit

Accounts receivable

   $363   million     Market
         Market

Other investments

   $258   million     Liquidity

Accounts payable

   $1,190   million     Liquidity

Debt

   $5,564   million     Interest rate

Restricted share units

   $43   million     Market

Deferred share units

   $9   million     Market

 

BARRICK YEAR-END 2019   88   MANAGEMENT’S DISCUSSION AND ANALYSIS


COMMITMENTS AND CONTINGENCIES

Litigation and Claims

We are currently subject to various litigation proceedings, and we may be involved in disputes with other parties in the future that may result in litigation. If we are unable to resolve these disputes favorably, it may have a material adverse impact on our financial condition, cash flow and results of operations.

Contractual Obligations and Commitments

In the normal course of business, we enter into contracts that give rise to commitments for future minimum payments. The following table summarizes the remaining contractual maturities of our financial liabilities and operating and capital commitments shown on an undiscounted basis:

 

($ millions)   

Payments due

as at December 31, 2019

 
(unaudited)    2020      2021      2022      2023      2024      2025
and
thereafter
     Total  

Debta

                    

Repayment of principalb

     14        7        337        0        0        5,109        5,467  

Capital leases

     25        15        12        8        5        32        97  

Interest

     323        321        314        307        306        4,445        6,016  

Provisions for environmental rehabilitationc

     169        174        193        176        143        2,103        2,958  

Restricted share units

     28        11        3        0        0        0        42  

Pension benefits and other post-retirement benefits

     27        7        7        7        6        99        153  

Minimum royalty paymentsd

     27        1        1        1        1        0        31  

Purchase obligations for supplies and consumablese

     473        229        142        142        142        553        1,681  

Capital commitmentsf

     155        111        37        27        31        22        383  

Social development costsg

     30        8        7        3        6        53        107  

Deposit on Pascua-Lama silver sale agreementh

     253        0        0        0        0        0        253  

Total

     1,524        884        1,053        671        640        12,416        17,188  

 

  a.

Debt and Interest - Our debt obligations do not include any subjective acceleration clauses or other clauses that enable the holder of the debt to call for early repayment, except in the event that we breach any of the terms and conditions of the debt or for other customary events of default. We are not required to post any collateral under any debt obligations. Projected interest payments on variable rate debt were based on interest rates in effect at December 31, 2019. Interest is calculated on our long-term debt obligations using both fixed and variable rates.

  b.

Repayment of principal - On January 31, 2020, we completed a make-whole repurchase of the outstanding $337 million of principal of the 3.85% notes due 2022. The $337 million of principal is included in the table above.

  c.

Provisions for environmental rehabilitation-Amounts presented in the table represent the undiscounted uninflated future payments for the expected cost of provisions for environmental rehabilitation.

  d.

Minimum royalty payments are related to continuing operations and are presented net of recoverable amounts.

  e.

Purchase obligations for supplies and consumables - Includes commitments related to new purchase obligations to secure a supply of acid, tires and cyanide for our production process.

  f.

Capital commitments - Purchase obligations for capital expenditures include only those items where binding commitments have been entered into.

  g.

Social development costs – Includes a commitment of $42 million ($28 million in 2020 and $14 million in 2025 and thereafter) related to the funding of a power transmission line in Argentina.

  h.

Deposit on Pascua-Lama silver sale agreement - Relates to our silver sale agreement with Wheaton Precious Metals Corp.

 

BARRICK YEAR-END 2019   89   MANAGEMENT’S DISCUSSION AND ANALYSIS


REVIEW OF QUARTERLY RESULTS

Quarterly Informationa

 

   
      2019      2018  
($ millions, except where indicated)
(unaudited)
   Q4      Q3      Q2      Q1      Q4     Q3     Q2     Q1  

Revenues

     2,883        2,678        2,063        2,093        1,904       1,837       1,712       1,790  

Realized price per ounce – goldb

     1,483        1,476        1,317        1,307        1,223       1,216       1,313       1,332  

Realized price per pound – copperb

     2.76        2.55        2.62        3.07        2.76       2.76       3.11       2.98  

Cost of sales

     1,987        1,889        1,545        1,490        1,577       1,315       1,176       1,152  

Net earnings (loss)

     1,387        2,277        194        111        (1,197     (412     (94     158  

Per share (dollars)c

     0.78        1.30        0.11        0.06        (1.02     (0.35     (0.08     0.14  

Adjusted net earningsb

     300        264        154        184        69       89       81       170  

Per share (dollars)b,c

     0.17        0.15        0.09        0.11        0.06       0.08       0.07       0.15  

Operating cash flow

     875        1,004        434        520        411       706       141       507  

Cash capital expenditures

     446        502        379        374        374       387       313       326  

Free cash flowb

     429        502        55        146        37       319       (172     181  

 

  a.

Sum of all the quarters may not add up to the annual total due to rounding.

  b.

Realized price, adjusted net earnings, adjusted net earnings per share and free cash flow are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures of performance presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 91 to 112 of this MD&A.

  c.

Calculated using weighted average number of shares outstanding under the basic method of earnings per share.

 

Our recent financial results reflect our emphasis on cost discipline and growing operating cash flow. The positive free cash flow4 generated, combined with the proceeds from various divestitures, have allowed us to continually strengthen our balance sheet over the past two years.

In the fourth quarter of 2019, we recorded $22 million (net of tax and non-controlling interests) of net impairment charges, mainly relating to a charge at Pascua-Lama of $296 million, partially offset by a net impairment reversal at Pueblo Viejo of $277 million. We also recorded a $628 million gain on the de-recognition of the deferred revenue liability relating to our silver sale agreement with Wheaton Precious Metals Corp., a gain of $408 million resulting from the sale of our 50% interest in Kalgoorlie, and a gain of $216 million on a tax settlement at Lumwana. In the third quarter of 2019, net earnings and cash flows were impacted by the formation of Nevada Gold Mines and the commencement of the

contribution of its operations to Barrick’s net earnings and cash flows. Net earnings in the third quarter of 2019 includes a $1.5 billion (net of tax effects) gain on remeasurement of Turquoise Ridge as a result of its contribution to Nevada Gold Mines and a $663 million (net of tax effects) impairment reversal at Lumwana. Starting in the first quarter of 2019, we had an increase in sales volume due to the Merger and the commencement of the contribution of Randgold’s operations to Barrick’s net earnings and cash flows. In the fourth quarter of 2018, we recorded $319 million (net of tax effects and non-controlling interests) of net asset impairments primarily relating to impairments of $160 million of non-current assets and $154 million of goodwill at the Veladero mine. We also recorded in the fourth quarter of 2018 an inventory impairment of $166 million at Lagunas Norte, which was included in cost of sales. In the third quarter of 2018, we recorded a $405 million impairment charge resulting from an asset impairment at Lagunas Norte.

 

 

IFRS CRITICAL ACCOUNTING POLICIES AND ACCOUNTING ESTIMATES

 

Management has discussed the development and selection of our critical accounting estimates with the Audit Committee of the Board of Directors, and the Audit Committee has reviewed the disclosure relating to such estimates in conjunction with its review of this MD&A. The accounting policies and methods we utilize determine how we report our financial condition and results of operations, and they may require Management to make estimates or rely on assumptions about matters that are inherently uncertain. The consolidated financial statements are prepared in accordance with IFRS as issued by the International Accounting Standards Board (“IASB”) under the historical cost convention, as modified by revaluation of certain financial assets, derivative contracts and post-retirement assets.

Critical Accounting Estimates and Judgments

Certain accounting estimates have been identified as being “critical” to the presentation of our financial condition and results of operations because they require us to make

subjective and/or complex judgments about matters that are inherently uncertain; or there is a reasonable likelihood that materially different amounts could be reported under different conditions or using different assumptions and estimates.

 

 

BARRICK YEAR-END 2019   90   MANAGEMENT’S DISCUSSION AND ANALYSIS


NON-GAAP FINANCIAL PERFORMANCE MEASURES

Adjusted Net Earnings and Adjusted Net Earnings per Share

 

Adjusted net earnings is a non-GAAP financial measure which excludes the following from net earnings:

   

Impairment charges (reversals) related to intangibles, goodwill, property, plant and equipment, and investments;

    Acquisition/disposition gains/losses;
    Foreign currency translation gains/losses;
    Significant tax adjustments;
   

Unrealized gains/losses on non-hedge derivative instruments; and

   

Tax effect and non-controlling interest of the above items.

Management uses this measure internally to evaluate our underlying operating performance for the reporting periods presented and to assist with the planning and forecasting of future operating results. Management believes that adjusted net earnings is a useful measure of our performance because impairment charges, acquisition/disposition gains/losses and significant tax adjustments do not reflect the underlying operating performance of our core mining business and are not necessarily indicative of future operating results. Furthermore, foreign currency translation gains/losses and unrealized gains/losses from non-hedge derivatives are not necessarily reflective of the underlying operating results for the reporting periods presented. The tax effect and non-controlling interest of the adjusting items are also excluded

to reconcile the amounts to Barrick’s share on a post-tax basis, consistent with net earnings.

As noted, we use this measure for internal purposes. Management’s internal budgets and forecasts and public guidance do not reflect the types of items we adjust for. Consequently, the presentation of adjusted net earnings enables investors and analysts to better understand the underlying operating performance of our core mining business through the eyes of management. Management periodically evaluates the components of adjusted net earnings based on an internal assessment of performance measures that are useful for evaluating the operating performance of our business segments and a review of the non-GAAP measures used by mining industry analysts and other mining companies.

Adjusted net earnings is intended to provide additional information only and does not have any standardized definition under IFRS and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The measures are not necessarily indicative of operating profit or cash flow from operations as determined under IFRS. Other companies may calculate these measures differently. The following table reconciles these non-GAAP measures to the most directly comparable IFRS measure.

 

 

Reconciliation of Net Earnings to Net Earnings per Share, Adjusted Net Earnings and Adjusted Net Earnings per Share

(unaudited)

 

  ($ millions, except per share amounts in dollars)    For the three months ended     For the years ended  
      12/31/19     9/30/19     12/31/19     12/31/18     12/31/17  

Net earnings (loss) attributable to equity holders of the Company

     1,387       2,277       3,969       (1,545     1,438  

Impairment charges (reversals) related to long-lived assetsa

     (566     (872     (1,423     900       (212

Acquisition/disposition (gains) lossesb

     (414     (1,901     (2,327     (68     (911

(Gain) loss on currency translation

     53       40       109       136       72  

Significant tax adjustmentsc

     74       35       34       742       244  

Other (income) expense adjustmentsd

     (845     53       (687     366       178  

Unrealized gains (losses) on non-hedge derivative instruments

     0       1       0       1       (1

Tax effect and non-controlling intereste

     611       631       1,227       (123     68  

Adjusted net earnings

     300       264       902       409       876  

Net earnings (loss) per sharef

     0.78       1.30       2.26       (1.32     1.23  

Adjusted net earnings per sharef

     0.17       0.15       0.51       0.35       0.75  

 

  a.

Net impairment reversals for the current year primarily relate to non-current asset reversals at Pueblo Viejo, partially offset by impairment charges at Pascua-Lama in the fourth quarter of 2019. This was further impacted by non-current asset reversals at Lumwana in the third quarter of 2019. Net impairment charges for 2018 primarily relate to non-current asset impairments at Lagunas Norte and non-current asset and goodwill impairments at Veladero.

  b.

Acquisition/disposition gains for the current year primarily relate to the gain on the sale of our 50% interest in Kalgoorlie in the fourth quarter of 2019 and the gain on the remeasurement of Turquoise Ridge to fair value as a result of its contribution to Nevada Gold Mines in the third quarter of 2019.

  c.

Significant tax adjustments in 2018 primarily relate to the de-recognition of our Canadian and Peruvian deferred tax assets.

  d.

Other expense adjustments for the current year primarily relate to the gain on the de-recognition of the deferred revenue liability relating to our silver sale agreement with Wheaton Precious Metals Corp. and the gain on a tax settlement at Lumwana, both occurring in the fourth quarter of 2019.

  e.

Tax effect and non-controlling interest for the current year primarily relates to the impairment charges related to long-lived assets.

  f.

Calculated using weighted average number of shares outstanding under the basic method of earnings per share.

 

Free Cash Flow

Free cash flow is a measure that deducts capital expenditures from net cash provided by operating activities. Management believes this to be a useful indicator of our ability to operate without reliance on additional borrowing or usage of existing cash.

Free cash flow is intended to provide additional information only and does not have any standardized definition under IFRS, and should not be considered in isolation or as a

substitute for measures of performance prepared in accordance with IFRS. The measure is not necessarily indicative of operating profit or cash flow from operations as determined under IFRS. Other companies may calculate this measure differently. The following table reconciles this non-GAAP measure to the most directly comparable IFRS measure.

 

 

BARRICK YEAR-END 2019   91   MANAGEMENT’S DISCUSSION AND ANALYSIS


Reconciliation of Net Cash Provided by Operating Activities to Free Cash Flow

(Unaudited)

 

  ($ millions)    For the three months ended     For the years ended  
      12/31/19     9/30/19     12/31/19     12/31/18     12/31/17  

Net cash provided by operating activities

     875       1,004       2,833       1,765       2,065  

Capital expenditures

     (446     (502     (1,701     (1,400     (1,396

Free cash flow

     429       502       1,132       365       669  

Total cash costs per ounce, All-in sustaining costs per ounce, All-in costs per ounce, C1 cash costs per pound and All-in sustaining costs per pound

 

Total cash costs per ounce, all-in sustaining costs per ounce and all-in costs per ounce are non-GAAP financial measures which are calculated based on the definition published by the World Gold Council (a market development organization for the gold industry comprised of and funded by 25 gold mining companies from around the world, including Barrick). The WGC is not a regulatory organization. Management uses these measures to monitor the performance of our gold mining operations and its ability to generate positive cash flow, both on an individual site basis and an overall company basis.

Total cash costs start with our cost of sales related to gold production and removes depreciation, the non-controlling interest of cost of sales and includes by-product credits. All-in sustaining costs start with total cash costs and include sustaining capital expenditures, sustaining leases, general and administrative costs, minesite exploration and evaluation costs and reclamation cost accretion and amortization. These additional costs reflect the expenditures made to maintain current production levels.

Starting from the first quarter of 2019, we have renamed “cash costs” to “total cash costs” when referring to our gold operations. The calculation of total cash costs is identical to our previous calculation of cash costs with only a change in the naming convention of this non-GAAP measure.

All-in costs starts with all-in sustaining costs and adds additional costs that reflect the varying costs of producing gold over the life-cycle of a mine, including: project capital expenditures (capital expenditures at new projects and discrete projects at existing operations intended to increase production capacity and will not benefit production for at least 12 months) and other non-sustaining costs (primarily non-sustaining leases, exploration and evaluation costs, community relations costs and general and administrative costs that are not associated with current operations). These definitions recognize that there are different costs associated with the life-cycle of a mine, and that it is therefore appropriate to distinguish between sustaining and non-sustaining costs.

Starting from the first quarter of 2019, we have included sustaining capital expenditures and project capital expenditures on a cash basis instead of an accrual basis. As a result of adopting IFRS 16 Leases, the full lease amount is included in accrued capital expenditures on initial recognition. We believe that the change in capital expenditures from an accrual basis to a cash basis better reflects the timing of costs associated with our operations. The original World Gold Council (“WGC”) Guidance Note explicitly excluded certain financing activities from all-in sustaining costs and all-in costs. As a result of the new lease accounting standard, the WGC Guidance Note was updated to include both the principal and interest portion of the cash lease payment in the all-in sustaining costs and all-in cost metrics. We have updated our calculation accordingly. Prior periods have not been restated but would not be materially different.

We believe that our use of total cash costs, all-in sustaining costs and all-in costs will assist analysts, investors and other stakeholders of Barrick in understanding the costs associated with producing gold, understanding the economics of gold mining, assessing our operating performance and also our ability to generate free cash flow from current operations and to generate free cash flow on an overall company basis. Due to the capital-intensive nature of the industry and the long useful lives over which these items are depreciated, there can be a significant timing difference between net earnings calculated in accordance with IFRS and the amount of free cash flow that is being generated by a mine and therefore we believe these measures are useful non-GAAP operating metrics and supplement our IFRS disclosures. These measures are not representative of all of our cash expenditures as they do not include income tax payments, interest costs or dividend payments. These measures do not include depreciation or amortization.

Total cash costs per ounce, all-in sustaining costs and all-in costs are intended to provide additional information only and do not have standardized definitions under IFRS and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. These measures are not equivalent to net income or cash flow from operations as determined under IFRS. Although the WGC has published a standardized definition, other companies may calculate these measures differently.

In addition to presenting these metrics on a by-product basis, we have calculated these metrics on a co-product basis. Our co-product metrics remove the impact of other metal sales that are produced as a by-product of our gold production from cost per ounce calculations but does not reflect a reduction in costs for costs associated with other metal sales.

C1 cash costs per pound and all-in sustaining costs per pound are non-GAAP financial measures related to our copper mine operations. We believe that C1 cash costs per pound enables investors to better understand the performance of our copper operations in comparison to other copper producers who present results on a similar basis. C1 cash costs per pound excludes royalties and production taxes and non-routine charges as they are not direct production costs. All-in sustaining costs per pound is similar to the gold all-in sustaining costs metric and management uses this to better evaluate the costs of copper production. We believe this measure enables investors to better understand the operating performance of our copper mines as this measure reflects all of the sustaining expenditures incurred in order to produce copper. All-in sustaining costs per pound includes C1 cash costs, sustaining capital expenditures, sustaining leases, general and administrative costs, minesite exploration and evaluation costs, royalties and production taxes, reclamation cost accretion and amortization and write-downs taken on inventory to net realizable value.

 

 

BARRICK YEAR-END 2019   92   MANAGEMENT’S DISCUSSION AND ANALYSIS


Reconciliation of Gold Cost of Sales to Total cash costs, All-in sustaining costs and All-in costs, including on a per ounce basis

(Unaudited)

 

($ millions, except per ounce information in dollars)          For the three months ended     For the years ended  
      Footnote    12/31/19     9/30/19     12/31/19     12/31/18     12/31/17  

Cost of sales applicable to gold production

        1,896       1,831       6,514       4,621       4,836  

Depreciation

        (549     (538     (1,902     (1,253     (1,529

Cash cost of sales applicable to equity method investments

        57       45       226       0       0  

By-product credits

        (43     (48     (138     (131     (135

Realized (gains) losses on hedge and non-hedge derivatives

   a      1       1       1       3       23  

Non-recurring items

   b      (22     (4     (55     (172     0  

Other

   c      (37     (19     (102     (87     (106

Non-controlling interests

   d      (326     (339     (878     (313     (299

Total cash costs

          977       929       3,666       2,668       2,790  

General & administrative costs

        31       68       212       265       248  

Minesite exploration and evaluation costs

   e      24       22       69       45       47  

Minesite sustaining capital expenditures

   f      394       406       1,320       975       1,109  

Sustaining leases

        4       5       27       0       0  

Rehabilitation - accretion and amortization (operating sites)

   g      7       28       65       81       64  

Non-controlling interest, copper operations and other

   h      (135     (184     (470     (374     (273

All-in sustaining costs

          1,302       1,274       4,889       3,660       3,985  

Project exploration and evaluation and project costs

   e      60       64       273       338       307  

Community relations costs not related to current operations

        0       1       2       4       4  

Project capital expenditures

   f      46       96       370       459       273  

Rehabilitation - accretion and amortization (non-operating sites)

   g      3       5       22       33       20  

Non-controlling interest and copper operations and other

   h      (28     (46     (105     (21     (21

All-in costs

          1,383       1,394       5,451       4,473       4,568  

Ounces sold - equity basis (000s ounces)

   i      1,413       1,318       5,467       4,544       5,302  

Cost of sales per ounce

   j,k      1,046       1,065       1,005       892       794  

Total cash costs per ounce

   k      692       710       671       588       526  

Total cash costs per ounce (on a co-product basis)

   k,l      712       735       689       607       544  

All-in sustaining costs per ounce

   k      923       984       894       806       750  

All-in sustaining costs per ounce (on a co-product basis)

   k,l      943       1,009       912       825       768  

All-in costs per ounce

   k      976       1,074       996       985       860  

All-in costs per ounce (on a co-product basis)

   k,l      996       1,099       1,014       1,004       878  

 

  a.

Realized (gains) losses on hedge and non-hedge derivatives

Includes realized hedge losses of $nil and $nil for the three months and year ended December 31, 2019, respectively (September 30, 2019: $nil; 2018: $4 million; 2017: $27 million), and realized non-hedge losses of $1 million and $1 million for the three months and year ended December 31, 2019, respectively (September 30, 2019: $1 million; 2018: gains of $1 million; 2017: gains of $4 million).

 

  b.

Non-recurring items

Non-recurring items in 2019 relate to organizational restructuring. These costs are not indicative of our cost of production and have been excluded from the calculation of total cash costs.

 

  c.

Other

Other adjustments for the three months and year ended December 31, 2019 include the removal of total cash costs and by-product credits associated with our Pierina mine, Golden Sunlight and Morila starting in the third quarter of 2019, and Lagunas Norte starting in the fourth quarter of 2019, which all are mining incidental ounces as they enter closure, of $35 million and $92 million, respectively (September 30, 2019: $19 million; 2018: $87 million; 2017: $108 million).

 

BARRICK YEAR-END 2019   93   MANAGEMENT’S DISCUSSION AND ANALYSIS


  d.

Non-controlling interests

Non-controlling interests include non-controlling interests related to gold production of $477 million and $1,306 million, respectively, for the three months and year ended December 31, 2019 (September 30, 2019: $506 million; 2018: $453 million; 2017: $454 million). Non-controlling interests include Pueblo Viejo and Tanzania until September 30, 2019 (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience). Starting January 1, 2019, the effective date of the Merger, non-controlling interests also include Loulo-Gounkoto and Tongon and starting July 1, 2019, it also includes Nevada Gold Mines.

 

  e.

Exploration and evaluation costs

Exploration, evaluation and project expenses are presented as minesite if it supports current mine operations and project if it relates to future projects. Refer to page 82 of this MD&A.

 

  f.

Capital expenditures

Capital expenditures are related to our gold sites only and are presented on a 100% cash basis starting from January 1, 2019 and on a 100% accrued basis for 2018 and 2017. They are split between minesite sustaining and project capital expenditures. Project capital expenditures are distinct projects designed to increase the net present value of the mine and are not related to current production. Significant projects in the current year are stripping at Rangefront declines, Cortez Crossroads, the Goldrush exploration declines, the Deep South Expansion, and construction of the third shaft at Turquoise Ridge. Refer to page 81 of this MD&A.

 

  g.

Rehabilitation - accretion and amortization

Includes depreciation on the assets related to rehabilitation provisions of our gold operations and accretion on the rehabilitation provisions of our gold operations, split between operating and non-operating sites.

 

  h.

Non-controlling interest and copper operations

Removes general & administrative costs related to non-controlling interests and copper based on a percentage allocation of revenue. Also removes exploration, evaluation and project expenses, rehabilitation costs and capital expenditures incurred by our copper sites and the non-controlling interest of our Tanzania operations until September 30, 2019 (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience) and Pueblo Viejo and South Arturo (63.1% of South Arturo from July 1, 2019 onwards as a result of its contribution to Nevada Gold Mines). Also removes the non-controlling interest of our Loulo-Gounkoto and Tongon operating segments commencing January 1, 2019, the effective date of the Merger, and of Nevada Gold Mines starting July 1, 2019. It also includes capital expenditures applicable to equity method investments. Figures remove the impact of Pierina, Golden Sunlight and Morila starting in the third quarter of 2019, and Lagunas Norte starting in the fourth quarter of 2019. The impact is summarized as the following:

 

    ($ millions)   For the three months ended     For the years ended  
    Non-controlling interest, copper operations and other   12/31/19     9/30/19     12/31/19     12/31/18     12/31/17  

General & administrative costs

    (3     (22     (58     (104     (21

Minesite exploration and evaluation costs

    (6     (9     (16     (3     (12

Rehabilitation - accretion and amortization (operating sites)

    (1     (10     (13     (6     (10

Minesite sustaining capital expenditures

    (125     (143     (383     (261     (230

All-in sustaining costs total

    (135     (184     (470     (374     (273

Project exploration and evaluation and project costs

    (14     (12     (54     (16     (17

Project capital expenditures

    (14     (34     (51     (5     (4

All-in costs total

    (28     (46     (105     (21     (21

 

  i.

Ounces sold - equity basis

Figures remove the impact of Pierina, Golden Sunlight and Morila starting in the third quarter of 2019, and Lagunas Norte starting in the fourth quarter of 2019, which are mining incidental ounces as the sites enter closure.

 

  j.

Cost of sales per ounce

Figures remove the cost of sales impact of Pierina of $14 million and $113 million, respectively, for the three months and year ended December 31, 2019 (September 30, 2019: $28 million; 2018: $116 million; 2017: $174 million); starting in the third quarter of 2019, Golden Sunlight of $nil and $1 million, respectively, for the three months and year ended December 31, 2019 (September 30, 2019: $1 million; 2018: $nil; 2017: $nil) and Morila of $13 million and $23 million, respectively, for the three months and year ended December 31, 2019 (September 30, 2019: $10 million; 2018: $nil; 2017: $nil); and starting in the fourth quarter of 2019, Lagunas Norte of $26 million and $26 million, respectively, for the three months and year ended December 31, 2019 (September 30, 2019: $nil; 2018: $nil; 2017: $nil), which are mining incidental ounces as these sites enter closure. Cost of sales per ounce excludes non-controlling interest related to gold production. Cost of sales applicable to gold per ounce is calculated using cost of sales on an attributable basis (removing the non-controlling interest of 40% Pueblo Viejo, 36.1% Tanzania until September 30, 2019 (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience) and 40% South Arturo from cost of sales (63.1% of South Arturo from July 1, 2019 onwards as a result of its contribution to Nevada Gold Mines)), divided by attributable gold ounces. The non-controlling interest of 20% Loulo-Gounkoto and 10.3% of Tongon is also removed from cost of sales and our proportionate share of cost of sales attributable to equity method investments (Kibali and Morila) is included commencing January 1, 2019, the effective date of the Merger. Also removes the non-controlling interest of 38.5% Nevada Gold Mines from cost of sales from July 1, 2019 onwards.

 

  k.

Per ounce figures

Cost of sales per ounce, cash costs per ounce, all-in sustaining costs per ounce and all-in costs per ounce may not calculate based on amounts presented in this table due to rounding.

 

  l.

Co-product costs per ounce

Cash costs per ounce, all-in sustaining costs per ounce and all-in costs per ounce presented on a co-product basis remove the impact of by-product credits of our gold production (net of non-controlling interest) calculated as:

 

    ($ millions)    For the three months ended     For the years ended  
      12/31/19     9/30/19     12/31/19     12/31/18     12/31/17  

By-product credits

     43       48       138       131       135  

Non-controlling interest

     (17     (16     (48     (45     (30

By-product credits (net of non-controlling interest)

     26       32       90       86       105  

 

BARRICK YEAR-END 2019   94   MANAGEMENT’S DISCUSSION AND ANALYSIS


Reconciliation of Gold Cost of Sales to Total cash costs, All-in sustaining costs and All-in costs, including on a per ounce basis, by operating segment

(unaudited)

 

($ millions, except per ounce information in dollars)     For the three months ended 12/31/19  
      Footnote    Carlina     Cortezb     Turquoise
Ridgec
    Long
Canyond
    Phoenixd     Nevada
Gold Minese
    Hemlo     Pueblo
Viejo
    Veladero  

Cost of sales applicable to gold production

        436       202       155       55       86       934       87       189       82  

Depreciation

        (92     (58     (55     (38     (22     (265     (7     (55     (29

By-product credits

        0       0       (1     0       (26     (27     0       (12     (3

Non-recurring items

   f      (1     0       0       0       0       (1     (21     (1     0  

Other

        0       0       0       0       0       0       0       0       0  

Non-controlling interests

          (132     (54     (38     (7     (14     (245     0       (48     0  

Total cash costs

          211       90       61       10       24       396       59       73       50  

General & administrative costs

        0       0       0       0       0       0       0       0       0  

Minesite exploration and evaluation costs

   g      8       3       1       3       1       16       0       0       1  

Minesite sustaining capital expenditures

   h      92       65       29       17       8       211       15       23       28  

Sustaining leases

        0       0       0       0       0       0       1       0       0  

Rehabilitation - accretion and amortization (operating sites)

   i      0       4       (1     (1     (2     0       0       4       1  

Non-controlling interests

          (45     (29     (9     (7     (4     (94     0       (11     0  

All-in sustaining costs

          266       133       81       22       27       529       75       89       80  

Project exploration and evaluation and project costs

   g      0       0       0       0       0       0       0       6       0  

Project capital expenditures

   h      0       6       11       0       0       38       0       0       0  

Non-controlling interests

          0       (3     (5     0       0       (17     0       (3     0  

All-in costs

          266       136       87       22       27       550       75       92       80  

Ounces sold - equity basis (000s ounces)

          275       132       99       33       26       565       53       174       70  

Cost of sales per ounce

   j,k      975       945       971       1,026       2,025       1,038       1,632       660       1,138  

Total cash costs per ounce

   k      766       681       625       317       902       711       1,091       422       710  

Total cash costs per ounce (on a co-product basis)

   k,l      767       684       632       319       1,504       760       1,094       462       733  

All-in sustaining costs per ounce

   k      965       1,012       800       657       1,034       944       1,380       517       1,142  

All-in sustaining costs per ounce (on a co-product basis)

   k,l      966       1,015       807       659       1,636       993       1,383       557       1,165  

All-in costs per ounce

   k      965       1,039       863       657       1,034       982       1,384       525       1,142  

All-in costs per ounce (on a co-product basis)

   k,l      966       1,042       870       659       1,636       1,031       1,387       565       1,165  

 

BARRICK YEAR-END 2019   95   MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars)     For the three months ended 12/31/19  
      Footnote    Porgera     Kalgoorliem     Loulo-
Gounkoto
    Kibali     North
Maran
    Tongon     Bulyanhulun     Buzwagin  

Cost of sales applicable to gold production

        75       44       186       106       105       99       12       31  

Depreciation

        (12     (6     (73     (52     (35     (45     (5     (2

By-product credits

        (1     (1     0       (1     (1     (1     0       0  

Non-recurring items

   f      0       0       0       0       0       0       0       0  

Other

        0       0       0       0       0       0       0       0  

Non-controlling interests

          0       0       (22     0       0       (6     0       0  

Total cash costs

          62       37       91       53       69       47       7       29  

General & administrative costs

        0       0       0       0       0       0       0       0  

Minesite exploration and evaluation costs

   g      1       2       5       2       0       1       0       0  

Minesite sustaining capital expenditures

   h      11       6       46       9       15       3       1       0  

Sustaining leases

        1       0       0       1       0       1       0       1  

Rehabilitation - accretion and amortization (operating sites)

   i      (1     1       1       0       1       0       0       0  

Non-controlling interests

          0       0       (11     0       0       (1     0       0  

All-in sustaining costs

          74       46       132       65       85       51       8       30  

Project exploration and evaluation and project costs

   g      0       0       0       0       0       0       0       0  

Project capital expenditures

   h      0       0       1       0       1       0       1       0  

Non-controlling interests

          0       0       0       0       0       0       0       0  

All-in costs

          74       46       133       65       86       51       9       30  

Ounces sold - equity basis (000s ounces)

          82       39       144       89       103       59       9       26  

Cost of sales per ounce

   j,k      909       1,127       1,037       1,205       1,021       1,476       1,293       1,235  

Total cash costs per ounce

   k      757       940       631       608       675       803       752       1,144  

Total cash costs per ounce (on a co-product basis)

   k,l      765       943       631       611       687       805       805       1,161  

All-in sustaining costs per ounce

   k      894       1,172       917       740       830       867       909       1,169  

All-in sustaining costs per ounce (on a co-product basis)

   k,l      902       1,175       917       743       842       869       962       1,186  

All-in costs per ounce

   k      894       1,172       922       746       840       867       935       1,169  

All-in costs per ounce (on a co-product basis)

   k,l      902       1,175       922       749       852       869       988       1,186  

 

BARRICK YEAR-END 2019   96   MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars)     For the three months ended 9/30/19  
      Footnote    Carlina     Cortezb     Turquoise
Ridgec
    Long
Canyond
    Phoenixd     Nevada Gold
Minese
    Hemlo     Pueblo
Viejo
    Veladero  

Cost of sales applicable to gold production

        445       170       168       46       68       897       55       181       72  

Depreciation

        (101     (53     (70     (32     (14     (270     (6     (48     (25

By-product credits

        (1     (1     (1     0       (22     (25     (1     (17     (1

Non-recurring items

   f      0       0       0       0       0       0       (1     0       0  

Other

        0       0       0       0       0       0       0       0       0  

Non-controlling interests

          (133     (45     (37     (5     (13     (233     0       (48     0  

Total cash costs

          210       71       60       9       19       369       47       68       46  

General & administrative costs

        0       0       0       0       0       0       0       0       0  

Minesite exploration and evaluation costs

   g      5       2       2       3       0       12       0       0       1  

Minesite sustaining capital expenditures

   h      102       36       27       9       14       188       15       27       19  

Sustaining leases

        0       0       1       0       0       1       0       0       1  

Rehabilitation - accretion and amortization (operating sites)

   i      8       4       3       1       4       20       1       3       1  

Non-controlling interests

          (48     (15     (12     (5     (6     (86     0       (12     0  

All-in sustaining costs

          277       98       81       17       31       504       63       86       68  

Project exploration and evaluation and project costs

   g      0       0       0       0       0       0       0       0       0  

Project capital expenditures

   h      0       49       13       0       0       85       0       0       0  

Non-controlling interests

          0       (18     (5     0       0       (31     0       0       0  

All-in costs

          277       129       89       17       31       558       63       86       68  

Ounces sold - equity basis (000s ounces)

          272       126       96       24       19       537       50       136       59  

Cost of sales per ounce

   j,k      1,007       829       1,077       1,170       2,186       1,027       1,083       807       1,243  

Total cash costs per ounce

   k      775       570       622       353       1,010       693       953       504       773  

Total cash costs per ounce (on a co-product basis)

   k,l      776       571       622       355       1,734       694       956       587       799  

All-in sustaining costs per ounce

   k      1,014       772       840       714       1,622       946       1,280       631       1,142  

All-in sustaining costs per ounce (on a co-product basis)

   k,l      1,015       773       840       716       2,346       947       1,283       714       1,168  

All-in costs per ounce

   k      1,014       1,020       927       714       1,622       1,048       1,280       636       1,142  

All-in costs per ounce (on a co-product basis)

   k,l      1,015       1,021       927       716       2,346       1,049       1,283       719       1,168  

 

BARRICK YEAR-END 2019   97   MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars)     For the three months ended 9/30/19  
      Footnote    Porgera     Kalgoorliem     Lagunas
Norteo
    Loulo-
Gounkoto
    Kibali     North
Maran
    Tongon     Bulyanhulun     Buzwagin  

Cost of sales applicable to gold production

        77       60       54       199       107       52       102       11       35  

Depreciation

        (11     (10     (5     (76     (57     (17     (44     (5     (2

By-product credits

        (1     0       (2     0       0       (1     0       0       0  

Non-recurring items

   f      0       0       (3     0       0       0       0       0       0  

Other

        0       0       0       0       0       0       0       0       0  

Non-controlling interests

          0       0       0       (25     0       (13     (6     (2     (12

Total cash costs

          65       50       44       98       50       21       52       4       21  

General & administrative costs

        0       0       0       0       0       0       0       0       0  

Minesite exploration and evaluation costs

   g      0       2       1       3       0       0       0       0       0  

Minesite sustaining capital expenditures

   h      14       15       0       60       13       14       4       0       0  

Sustaining leases

        1       1       0       2       0       0       1       0       0  

Rehabilitation - accretion and amortization (operating sites)

   i      (1     0       2       0       0       1       0       0       0  

Non-controlling interests

          0       0       0       (13     0       (5     0       0       0  

All-in sustaining costs

          79       68       47       150       63       31       57       4       21  

Project exploration and evaluation and project costs

   g      0       0       0       0       0       0       0       0       0  

Project capital expenditures

   h      0       0       0       1       1       1       0       1       0  

Non-controlling interests

          0       0       0       (1     0       0       0       0       0  

All-in costs

          79       68       47       150       64       32       57       5       21  

Ounces sold - equity basis (000s ounces)

          75       58       33       155       89       36       66       5       18  

Cost of sales per ounce

   j,k      1,024       1,037       1,661       1,018       1,187       907       1,396       1,288       1,292  

Total cash costs per ounce

   k      868       856       1,327       630       554       603       793       729       1,202  

Total cash costs per ounce (on a co-product basis)

   k,l      878       859       1,374       630       554       608       795       754       1,210  

All-in sustaining costs per ounce

   k      1,053       1,170       1,422       966       703       850       869       769       1,220  

All-in sustaining costs per ounce (on a co-product basis)

   k,l      1,063       1,173       1,469       966       703       855       871       794       1,228  

All-in costs per ounce

   k      1,053       1,170       1,422       971       717       886       869       866       1,220  

All-in costs per ounce (on a co-product basis)

   k,l      1,063       1,173       1,469       971       717       891       871       891       1,228  

 

BARRICK YEAR-END 2019   98   MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars)     For the year ended 12/31/19  
      Footnote    Carlina     Cortezb     Turquoise
Ridgec
    Long
Canyond
    Phoenixd     Nevada Gold
Minese
    Hemlo     North
America
 

Cost of sales applicable to gold production

        1,310       751       425       101       154       2,741       247       2,988  

Depreciation

        (312     (240     (140     (70     (36     (798     (27     (825

By-product credits

        (1     (1     (2     0       (48     (52     (1     (53

Non-recurring items

   f      (10     0       0       0       0       (10     (23     (33

Other

        0       0       0       0       0       0       0       0  

Non-controlling interests

          (266     (99     (75     (12     (27     (479     0       (479

Total cash costs

          721       411       208       19       43       1,402       196       1,598  

General & administrative costs

        0       0       0       0       0       0       0       0  

Minesite exploration and evaluation costs

   g      17       8       4       6       1       36       1       37  

Minesite sustaining capital expenditures

   h      307       129       70       26       22       554       47       601  

Sustaining leases

        0       0       1       0       0       1       1       2  

Rehabilitation - accretion and amortization (operating sites)

   i      10       16       2       0       2       30       2       32  

Non-controlling interests

          (102     (44     (21     (12     (10     (189     0       (189

All-in sustaining costs

          953       520       264       39       58       1,834       247       2,081  

Project exploration and evaluation and project costs

   g      0       0       0       0       0       0       0       0  

Project capital expenditures

   h      0       186       45       0       0       295       0       295  

Non-controlling interests

          0       (21     (10     0       0       (48     0       (48

All-in costs

          953       685       299       39       58       2,081       247       2,328  

Ounces sold - equity basis (000s ounces)

          967       798       356       57       45       2,223       217       2,440  

Cost of sales per ounce

   j,k      1,004       762       846       1,088       2,093       924       1,137       943  

Total cash costs per ounce

   k      746       515       585       333       947       634       904       655  

Total cash costs per ounce (on a co-product basis)

   k,l      747       516       588       335       1,600       657       907       677  

All-in sustaining costs per ounce

   k      984       651       732       681       1,282       828       1,140       851  

All-in sustaining costs per ounce (on a co-product basis)

   k,l      985       652       735       683       1,935       851       1,143       873  

All-in costs per ounce

   k      984       854       834       681       1,282       938       1,141       953  

All-in costs per ounce (on a co-product basis)

   k,l      985       855       837       683       1,935       961       1,144       975  

 

BARRICK YEAR-END 2019   99   MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars)     For the year ended 12/31/19  
      Footnote    Pueblo Viejo     Veladero     Porgera     Kalgoorliem     Latin America &
Asia Pacific
 

Cost of sales applicable to gold production

        721       323       284       223       1,551  

Depreciation

        (196     (115     (42     (38     (391

By-product credits

        (61     (8     (3     (1     (73

Non-recurring items

   f      (2     (1     0       0       (3

Other

        0       0       0       0       0  

Non-controlling interests

          (187     0       0       0       (187

Total cash costs

          275       199       239       184       897  

General & administrative costs

        0       0       0       0       0  

Minesite exploration and evaluation costs

   g      0       3       2       6       11  

Minesite sustaining capital expenditures

   h      107       91       45       52       295  

Sustaining leases

        0       2       3       4       9  

Rehabilitation - accretion and amortization (operating sites)

   i      10       5       (2     3       16  

Non-controlling interests

          (47     0       0       0       (47

All-in sustaining costs

          345       300       287       249       1,181  

Project exploration and evaluation and project costs

   g      8       0       0       0       8  

Project capital expenditures

   h      0       15       0       0       15  

Non-controlling interests

          (3     0       0       0       (3

All-in costs

          350       315       287       249       1,201  

Ounces sold - equity basis (000s ounces)

          584       271       285       210       1,350  

Cost of sales per ounce

   j,k      747       1,188       994       1,062       937  

Total cash costs per ounce

   k      471       734       838       873       664  

Total cash costs per ounce (on a co-product basis)

   k,l      536       759       848       876       716  

All-in sustaining costs per ounce

   k      592       1,105       1,003       1,183       874  

All-in sustaining costs per ounce (on a co-product basis)

   k,l      657       1,130       1,013       1,186       926  

All-in costs per ounce

   k      600       1,162       1,003       1,183       885  

All-in costs per ounce (on a co-product basis)

   k,l      665       1,187       1,013       1,186       937  

 

BARRICK YEAR-END 2019   100   MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars)     For the year ended 12/31/19
 
      Footnote    Loulo-
Gounkoto
    Kibali     North
Maran
    Tongon     Bulyanhulun     Buzwagin     Africa & Middle
East
 

Cost of sales applicable to gold production

        751       403       310       402       45       138       2,049  

Depreciation

        (295     (196     (97     (186     (19     (8     (801

By-product credits

        0       (1     (2     (1     (1     (1     (6

Non-recurring items

   f      0       0       0       0       0       0       0  

Other

        0       0       0       0       0       0       0  

Non-controlling interests

          (91     0       (51     (23     (7     (36     (208

Total cash costs

          365       206       160       192       18       93       1,034  

General & administrative costs

        0       0       0       0       0       0       0  

Minesite exploration and evaluation costs

   g      12       3       0       3       0       0       18  

Minesite sustaining capital expenditures

   h      165       41       48       11       2       0       267  

Sustaining leases

        3       1       0       2       0       1       7  

Rehabilitation - accretion and amortization (operating sites)

   i      1       0       3       0       1       1       6  

Non-controlling interests

          (37     0       (13     (2     (1     0       (53

All-in sustaining costs

          509       251       198       206       20       95       1,279  

Project exploration and evaluation and project costs

   g      0       0       0       0       0       0       0  

Project capital expenditures

   h      4       2       9       0       3       0       18  

Non-controlling interests

          (1     0       (3     0       (1     0       (5

All-in costs

          512       253       204       206       22       95       1,292  

Ounces sold - equity basis (000s ounces)

          575       363       248       245       27       81       1,539  

Cost of sales per ounce

   j,k      1,044       1,111       953       1,469       1,207       1,240       1,332  

Total cash costs per ounce

   k      634       568       646       787       676       1,156       673  

Total cash costs per ounce (on a co-product basis)

   k,l      634       571       654       789       709       1,166       677  

All-in sustaining costs per ounce

   k      886       693       802       844       773       1,178       834  

All-in sustaining costs per ounce (on a co-product basis)

   k,l      886       696       810       846       806       1,188       838  

All-in costs per ounce

   k      891       701       824       846       840       1,178       842  

All-in costs per ounce (on a co-product basis)

   k,l      891       704       832       848       873       1,188       846  

 

BARRICK YEAR-END 2019   101   MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars)      For the year ended 12/31/18  
      Footnote    Carlina     Cortezb     Turquoise
Ridgec
    Long
Canyond
     Phoenixd      Nevada
Gold Minese
    Hemlo     Golden
Sunlighto
     Pueblo
Viejo
    Veladero  

Cost of sales applicable to gold production

        886       828       206                                           1,921       195       53        732       310  

Depreciation

        (262     (386     (28           (677     (18     0        (185     (121

By-product credits

        (1     (1     0             (2     (1     0        (90     (8

Non-recurring items

   f      0       0       0             0       0       0        (2     (4

Other

        0       0       0             0       0       0        2       0  

Non-controlling interests

          0       0       0                         0       0       0        (183     0  

Total cash costs

          623       441       178                         1,242       176       53        274       177  

General & administrative costs

        0       0       0             0       0       0        0       0  

Minesite exploration and evaluation costs

   g      13       6       0             19       0       0        0       2  

Minesite sustaining capital expenditures

   h      195       65       20             280       42       3        145       143  

Sustaining leases

        0       0       0             0       0       0        0       0  

Rehabilitation - accretion and amortization (operating sites)

   i      5       25       1             31       4       3        10       1  

Non-controlling interests

          (10     0       0                         (10     0       0        (62     0  

All-in sustaining costs

          826       537       199                         1,562       222       59        367       323  

Project exploration and evaluation and project costs

   g      0       0       0             6       0       0        0       0  

Project capital expenditures

   h      0       276       42             354       0       0        0       0  

Non-controlling interests

          0       0       0                         0       0       0        0       0  

All-in costs

          826       813       241                         1,922       222       59        367       323  

Ounces sold - equity basis (000s ounces)

        842       1,255       262             2,359       168       30        590       280  

Cost of sales per ounce

   j,k      1,054       659       783                         814       1,157       1,755        750       1,112  

Total cash costs per ounce

   k      740       351       678             526       1,046       1,762        465       629  

Total cash costs per ounce (on a co-product basis)

   k,l      742       352       678                         527       1,050       1,772        553       654  

All-in sustaining costs per ounce

   k      983       430       756             664       1,318       1,954        623       1,154  

All-in sustaining costs per ounce (on a co-product basis)

   k,l      985       431       756                         665       1,322       1,964        711       1,179  

All-in costs per ounce

   k      983       649       916             814       1,320       1,954        623       1,154  

All-in costs per ounce (on a co-product basis)

   k,l      985       650       916                         815       1,324       1,964        711       1,179  

 

BARRICK YEAR-END 2019   102   MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars)             For the year ended 12/31/18  
      Footnote    Porgera     Kalgoorlie     Lagunas
Norteo
    Loulo-
Gounkotop
     Kibalip      North
Maran
    Tongonp      Bulyanhulun     Buzwagin     Morilao,p  

Cost of sales applicable to gold production

        213       288       337             264          53       139    

Depreciation

        (42     (52     (46           (62        (24     (3  

By-product credits

        (2     (2     (13           (2        (1     (1  

Non-recurring items

   f      0       0       (166           0          0       0    

Other

        0       0       0                                       0                       0       0                 

Non-controlling interests

          0       0       0                         (72              (10     (49        

Total cash costs

          169       234       112                         128                18       86          

General & administrative costs

        0       0       0             0          0       0    

Minesite exploration and evaluation costs

   g      0       10       2             0          0       0    

Minesite sustaining capital expenditures

   h      62       26       20             74          3       4    

Sustaining leases

        0       0       0             0          0       0    

Rehabilitation - accretion and amortization (operating sites)

   i      (1     4       25             2          1       1    

Non-controlling interests

          0       0       0                         (27              (1     (2        

All-in sustaining costs

          230       274       159                         177                21       89          

Project exploration and evaluation and project costs

   g      0       0       0             0          0       0    

Project capital expenditures

   h      0       0       2             8          4       0    

Non-controlling interests

          0       0       0                         (3              (1     0          

All-in costs

          230       274       161                         182                24       89          

Ounces sold - equity basis (000s ounces)

        213       320       251             212          27       94    

Cost of sales per ounce

   j,k      996       899       1,342                         795                1,231       939          

Total cash costs per ounce

   k      796       732       448             603          650       916    

Total cash costs per ounce (on a co-product basis)

   k,l      810       737       499                         609                674       922          

All-in sustaining costs per ounce

   k      1,083       857       636             830          754       947    

All-in sustaining costs per ounce (on a co-product basis)

   k,l      1,097       862       687                         836                778       953          

All-in costs per ounce

   k      1,083       857       644             855          848       947    

All-in costs per ounce (on a co-product basis)

   k,l      1,097       862       695                         861                872       953          

 

BARRICK YEAR-END 2019   103   MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars)     For the year ended 12/31/17  
      Footnote    Carlina     Cortezb     Turquoise
Ridgec
    Long
Canyond
     Phoenixd      Nevada
Gold Minese
    Hemlo     Golden
Sunlighto
    Pueblo
Viejo
    Veladeroq  

Cost of sales applicable to gold production

        889       980       159             2,028       193       55       730       410  

Depreciation

        (260     (533     (28                                     (821     (27     (3     (229     (119

By-product credits

        (2     (1     0             (3     (1     0       (72     (17

Non-recurring items

   f      0       0       0             0       0       0       0       0  

Other

        0       0       0             0       0       0       0       0  

Non-controlling interests

          (1     0       0                         (1     0       0       (171     0  

Total cash costs

          626       446       131                         1,203       165       52       258       274  

General & administrative costs

        0       0       0             0       0       0       0       0  

Minesite exploration and evaluation costs

   g      10       6       0             16       0       0       0       3  

Minesite sustaining capital expenditures

   h      264       96       32             392       44       0       114       173  

Sustaining leases

        0       0       0             0       0       0       0       0  

Rehabilitation - accretion and amortization (operating sites)

   i      10       15       1             26       5       2       13       2  

Non-controlling interests

          (3     0       0                         (3     0       0       (51     0  

All-in sustaining costs

          907       563       164                         1,634       214       54       334       452  

Project exploration and evaluation and project costs

   g      0       0       0             8       0       0       0       0  

Project capital expenditures

   h      0       198       4             228       5       1       0       0  

Non-controlling interests

          0       0       0                         0       0       0       0       0  

All-in costs

          907       761       168                         1,870       219       55       334       452  

Ounces sold - equity basis (000s ounces)

        868       1,489       222             2,579       196       41       637       458  

Cost of sales per ounce

   j,k      1,024       657       715                         786       986       1,334       699       897  

Total cash costs per ounce

   k      721       300       589             467       841       1,265       405       598  

Total cash costs per ounce (on a co-product basis)

   k,l      723       301       589                         468       846       1,270       475       636  

All-in sustaining costs per ounce

   k      1,045       380       733             634       1,092       1,329       525       987  

All-in sustaining costs per ounce (on a co-product basis)

   k,l      1,047       381       733                         635       1,097       1,334       595       1,025  

All-in costs per ounce

   k      1,045       512       753             726       1,119       1,349       525       987  

All-in costs per ounce (on a co-product basis)

   k,l      1,047       513       753                         727       1,124       1,354       595       1,025  

 

BARRICK YEAR-END 2019   104   MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars)      For the year ended 12/31/17  
      Footnote    Porgera     Kalgoorlie     Lagunas
Norteo
    Loulo-
Gounkotop
     Kibalip      North
Maran
    Tongonp      Bulyanhulun     Buzwagin     Morilao,p  

Cost of sales applicable to gold production

        239       292       245                                           223                       142       104                 

Depreciation

        (39     (58     (68           (56        (47     (4  

By-product credits

        (3     (2     (16           (1        (3     (3  

Non-recurring items

   f      0       0       0             0          0       0    

Other

        0       0       0             0          1       0    

Non-controlling interests

          0       0       0                         (60              (33     (34        

Total cash costs

          197       232       161                         106                60       63          

General & administrative costs

        0       0       0             0          0       0    

Minesite exploration and evaluation costs

   g      1       9       4             0          0       0    

Minesite sustaining capital expenditures

   h      55       20       20             83          49       5    

Sustaining leases

        0       0       0             0          0       0    

Rehabilitation - accretion and amortization (operating sites)

   i      (2     3       7             3          2       1    

Non-controlling interests

          0       0       0                         (31              (18     (2        

All-in sustaining costs

          251       264       192                         161                93       67          

Project exploration and evaluation and project costs

   g      0       0       0             0          0       0    

Project capital expenditures

   h      0       0       5             10          1       0    

Non-controlling interests

          0       0       0                         (4              0       0          

All-in costs

          251       264       197                         167                94       67          

Ounces sold - equity basis (000s ounces)

        253       362       397             207          69       103    

Cost of sales per ounce

   j,k      944       806       617                         683                1,309       643          

Total cash costs per ounce

   k      781       642       405             509          848       600    

Total cash costs per ounce (on a co-product basis)

   k,l      791       647       446                         513                872       616          

All-in sustaining costs per ounce

   k      993       729       483             773          1,319       632    

All-in sustaining costs per ounce (on a co-product basis)

   k,l      1,003       734       524                         777                1,343       648          

All-in costs per ounce

   k      993       729       497             804          1,330       632    

All-in costs per ounce (on a co-product basis)

   k,l      1,003       734       538                         808                1,354       648          

 

a.

On July 1, 2019, Barrick’s Goldstrike and Newmont’s Carlin were contributed to Nevada Gold Mines and are now referred to as Carlin. As a result, the amounts presented represent Goldstrike on a 100% basis (including our 60% share of South Arturo) up until June 30, 2019, and the combined results of Carlin and Goldstrike (including our 60% share of South Arturo) on a 61.5% basis thereafter.

 

b.

On July 1, 2019, Cortez was contributed to Nevada Gold Mines, a joint venture with Newmont. As a result, the amounts presented are on a 100% basis up until June 30, 2019, and on a 61.5% basis thereafter.

 

c.

Barrick owned 75% of Turquoise Ridge through to the end of the second quarter of 2019, with our joint venture partner, Newmont, owning the remaining 25%. Turquoise Ridge was proportionately consolidated on the basis that the joint venture partners that have joint control have rights to the assets and obligations for the liabilities relating to the arrangement. The figures presented in this table are based on our 75% interest in Turquoise Ridge until June 30, 2019. On July 1, 2019, Barrick’s 75% interest in Turquoise Ridge and Newmont’s Twin Creeks and 25% interest in Turquoise Ridge were contributed to Nevada Gold Mines. Starting July 1, 2019, the results represent our 61.5% share of Turquoise Ridge and Twin Creeks, now referred to as Turquoise Ridge.

 

d.

These sites were acquired as a result of the formation of Nevada Gold Mines on July 1, 2019.    The results for 2018 and 2017 did not form a part of the Barrick consolidated results as these sites were acquired as a result of the formation of Nevada Gold Mines. Therefore, no comparative figures are provided.

 

BARRICK YEAR-END 2019   105   MANAGEMENT’S DISCUSSION AND ANALYSIS


e.

Represents the combined results of Cortez, Goldstrike (including our 60% share of South Arturo) and our 75% interest in Turquoise Ridge until June 30, 2019. Commencing July 1, 2019, the date Nevada Gold Mines was established, the results represent our 61.5% interest in Cortez, Carlin (including Goldstrike and 60% of South Arturo), Turquoise Ridge (including Twin Creeks), Phoenix and Long Canyon.

 

f.

Non-recurring items

Non-recurring items in 2019 relate to organizational restructuring. These costs are not indicative of our cost of production and have been excluded from the calculation of total cash costs.

 

g.

Exploration and evaluation costs

Exploration, evaluation and project expenses are presented as minesite sustaining if it supports current mine operations and project if it relates to future projects. Refer to page 82 of this MD&A.

 

h.

Capital expenditures

Capital expenditures are related to our gold sites only and are presented on a 100% cash basis starting from January 1, 2019 and on a 100% accrued basis for 2018 and 2017. They are split between minesite sustaining and project capital expenditures. Project capital expenditures are distinct projects designed to increase the net present value of the mine and are not related to current production. Significant projects in the current year are stripping at Rangefront declines, Cortez Crossroads, the Goldrush exploration declines, the Deep South Expansion, and construction of the third shaft at Turquoise Ridge. Refer to page 81 of this MD&A.

 

i.

Rehabilitation - accretion and amortization

Includes depreciation on the assets related to rehabilitation provisions of our gold operations and accretion on the rehabilitation provision of our gold operations, split between operating and non-operating sites.

 

j.

Cost of sales per ounce

Cost of sales applicable to gold per ounce is calculated using cost of sales on an attributable basis (removing the non-controlling interest of 40% Pueblo Viejo, 36.1% Tanzania until September 30, 2019 (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience) and 40% South Arturo from cost of sales (63.1% of South Arturo from July 1, 2019 onwards as a result of its contribution to Nevada Gold Mines)), divided by attributable gold ounces. The non-controlling interest of 20% Loulo-Gounkoto and 10.3% of Tongon is also removed from cost of sales and our proportionate share of cost of sales attributable to equity method investments (Kibali and Morila) is included commencing January 1, 2019, the effective date of the Merger. Also removes the non-controlling interest of 38.5% Nevada Gold Mines from cost of sales from July 1, 2019 onwards.

 

k.

Per ounce figures

Cost of sales per ounce, total cash costs per ounce, all-in sustaining costs per ounce and all-in costs per ounce may not calculate based on amounts presented in this table due to rounding.

 

l.

Co-product costs per ounce

Total cash costs per ounce, all-in sustaining costs per ounce and all-in costs per ounce presented on a co-product basis removes the impact of by-product credits of our gold production (net of non-controlling interest) calculated as:

 

($ millions)                                   For the three months ended 12/31/19  
      Carlina      Cortezb      Turquoise
Ridgec
    Long
Canyond
     Phoenixd     Nevada
Gold
Minese
    Hemlo      Pueblo
Viejo
    Veladero  

By-product credits

     0        0        1       0        26       27       0        12       3  

Non-controlling interest

     0        0        (1     0        (9     (10     0        (6     0  

By-product credits (net of non-controlling interest)

     0        0        0       0        17       17       0        6       3  

($ millions)

                                        For the three months ended 12/31/19  
      Porgera      Kalgoorliem      Loulo-
Gounkoto
    Kibali      North
Maran
    Tongon     Bulyanhulun      Buzwagin         

By-product credits

     1        1        0       1        1       1       0        0    

Non-controlling interest

     0        0        0       0        0       0       0        0          

By-product credits (net of non-controlling interest)

     1        1        0       1        1       1       0        0          

($ millions)

                                        For the three months ended 9/30/19  
      Carlina      Cortezb      Turquoise
Ridgec
    Long
Canyond
     Phoenixd     Nevada
Gold
Minese
    Hemlo      Pueblo
Viejo
    Veladero  

By-product credits

     1        1        1       0        22       25       1        17       1  

Non-controlling interest

     0        0        0       0        (9     (9     0        (6     0  

By-product credits (net of non-controlling interest)

     1        1        1       0        13       16       1        11       1  

($ millions)

                                        For the three months ended 9/30/19  
      Porgera      Kalgoorliem      Lagunas
Norteo
    Loulo-
Gounkoto
     Kibali     North
Maran
    Tongon      Bulyanhulun     Buzwagin  

By-product credits

     1        0        2       0        0       1       0        0       0  

Non-controlling interest

     0        0        0       0        0       0       0        0       0  

By-product credits (net of non-controlling interest)

     1        0        2       0        0       1       0        0       0  

 

BARRICK YEAR-END 2019   106   MANAGEMENT’S DISCUSSION AND ANALYSIS


                                            For the year ended 12/31/19  
      Carlina      Cortezb      Turquoise
Ridgec
    Long
Canyond
     Phoenixd     Nevada Gold
Minese
    Hemlo      Pueblo
Viejo
    Veladero  

By-product credits

     1        1        2       0        48       52       1        61       8  

Non-controlling interest

     0        0        (1     0        (18     (19     0        (24     0  

By-product credits (net of non-controlling interest)

     1        1        1       0        30       33       1        37       8  
                                            For the year ended 12/31/19  
      Porgera      Kalgoorliem      Loulo-
Gounkoto
    Kibali      North
Maran
    Tongon     Bulyanhulun      Buzwagin         

By-product credits

     3        1        0       1        2       1       1        1    

Non-controlling interest

     0        0        0       0        0       0       0        0          

By-product credits (net of non-controlling interest)

     3        1        0       1        2       1       1        1          

 

                             For the year ended 12/31/18  
      Carlina      Cortezb      Turquoise
Ridgec
    Long
Canyond
    Phoenixd     Nevada
Gold Minese
    Hemlo     Golden
Sunlighto
    Pueblo
Viejo
    Veladero  

By-product credits

     1        1        0           2       1       0       90       8  

Non-controlling interest

     0        0        0                       0       0       0       (37)       0  

By-product credits (net of non-controlling interest)

     1        1        0                       2       1       0       53       8  
                             For the year ended 12/31/18  
      Porgera      Kalgoorlie      Lagunas
Norteo
    Loulo-
Gounkotop
    Kibalip     North Maran     Tongonp     Bulyanhulun     Buzwagin     Morilao,p  

By-product credits

     2        2        13           2         1       1    

Non-controlling interest

     0        0        0                       (1)               0       0          

By-product credits (net of non-controlling interest)

     2        2        13                       1               1       1          
                             For the year ended 12/31/17  
      Carlina      Cortezb      Turquoise
Ridgec
    Long
Canyond
    Phoenixd     Nevada
Gold Minese
    Hemlo     Golden
Sunlighto
    Pueblo
Viejo
    Veladeroq  

By-product credits

     2        1        0           3       1       0       72       17  

Non-controlling interest

     0        0        0                       0       0       0       0       0  

By-product credits (net of non-controlling interest)

     2        1        0                       3       1       0       72       17  
                             For the year ended 12/31/17  
       Porgera        Kalgoorlie       
Lagunas
Norte
 
o 
   

Loulo

Gounkoto


p 

    Kibali p      North Mara n      Tongon p      Bulyanhulu n      Buzwagi n      Morila o,p 

By-product credits

     3        2        16           1         3       3    

Non-controlling interest

     0        0        0                       0               (1)       (2)          

By-product credits (net of non-controlling interest)

     3        2        16                       1               2       1          

 

m.

On November 28, 2019, we completed the sale of our 50% interest in Kalgoorlie in Western Australia to Saracen Mineral Holdings Limited for total cash consideration of $750 million. The transaction resulted in a gain of $408 million for the year ended December 31, 2019. The operating results reported for Kalgoorlie reflect the Company’s attributable share of Kalgoorlie’s results until the date of disposal.

 

n.

Formerly part of Acacia Mining plc. On September 17, 2019, Barrick acquired all of the shares of Acacia it did not own. The results are on a 63.9% basis until September 30, 2019 and on a 100% basis from October 1, 2019 onwards.

 

o.

With the end of mining at Lagunas Norte in the third quarter of 2019 and at Golden Sunlight and Morila in the second quarter of 2019 as previously reported, we have ceased to include production or non-GAAP cost metrics for these sites from October 1, 2019 and July 1, 2019, respectively, onwards.

 

p.

The results for 2018 and 2017 did not form a part of the Barrick consolidated results as these sites were acquired as a result of the Merger. Therefore, no comparative figures are provided.

 

q.

On June 30, 2017, we sold 50% of Veladero; therefore, these represent results on a 100% basis from January 1 to June 30, 2017 and on a 50% basis from July 1, 2017 onwards.

 

BARRICK YEAR-END 2019   107   MANAGEMENT’S DISCUSSION AND ANALYSIS


Reconciliation of Copper Cost of Sales to C1 cash costs and All-in sustaining costs, including on a per pound basis

(unaudited)

 

($ millions, except per pound information in dollars)    For the three months ended     For the years ended  
      12/31/19     9/30/19     12/31/19     12/31/18     12/31/17  

Cost of sales

     80       49       361       558       399  

Depreciation/amortization

     (17     (13     (100     (170     (83

Treatment and refinement charges

     25       18       99       144       157  

Cash cost of sales applicable to equity method investments

     94       59       288       281       245  

Less: royalties and production taxesa

     (9     (5     (35     (44     (38

By-product credits

     (1     (3     (9     (6     (5

Other

     0       0       (5     (11     0  

C1 cash cost of sales

     172       105       599       752       675  

General & administrative costs

     3       5       19       28       12  

Rehabilitation - accretion and amortization

     7       2       15       16       12  

Royalties and production taxes

     9       5       35       44       38  

Minesite exploration and evaluation costs

     2       1       6       4       6  

Minesite sustaining capital expenditures

     60       48       215       220       204  

Sustaining leases

     3       0       5       0       0  

Inventory write-downs

     0       0       0       11       0  

All-in sustaining costs

     256       166       894       1,075       947  

Pounds sold - consolidated basis (millions pounds)

     91       65       355       382       405  

Cost of sales per poundb,c

     2.26       2.00       2.14       2.40       1.77  

C1 cash costs per poundb

     1.90       1.62       1.69       1.97       1.66  

All-in sustaining costs per poundb

     2.82       2.58       2.52       2.82       2.34  

 

  a.

For the three months and year ended December 31, 2019, royalties and production taxes include royalties of $8 million and $34 million, respectively (September 30, 2019: $5 million, 2018: $39 million and 2017: $38 million).

  b.

Cost of sales per pound, C1 cash costs per pound and all-in sustaining costs per pound may not calculate based on amounts presented in this table due to rounding.

  c.

Cost of sales per pound related to copper is calculated using cost of sales including our proportionate share of cost of sales attributable to equity method investments (Zaldívar and Jabal Sayid), divided by consolidated copper pounds sold (including our proportionate share of copper pounds sold from our equity method investments).

 

BARRICK YEAR-END 2019   108   MANAGEMENT’S DISCUSSION AND ANALYSIS


Reconciliation of Copper Cost of Sales to C1 cash costs and All-in sustaining costs, including on a per pound basis, by operating site

(unaudited)

 

($ millions, except per pound information in dollars)    For the three months ended  
      12/31/19     9/30/19  
      Zaldívar     Lumwana     Jabal Sayid     Zaldívar     Lumwana     Jabal Sayid  

Cost of sales

     104       80       22       57       49       24  

Depreciation/amortization

     (26     (17     (7     (17     (13     (5

Treatment and refinement charges

     0       20       5       0       14       4  

Less: royalties and production taxesa

     0       (9     0       0       (5     0  

By-product credits

     0       0       (1     0       0       (3

Other

     0       0       0       0       0       0  

C1 cash cost of sales

     78       74       19       40       45       20  

Rehabilitation - accretion and amortization

     4       3       0       0       2       0  

Royalties and production taxes

     0       9       0       0       5       0  

Minesite exploration and evaluation costs

     2       0       0       1       0       0  

Minesite sustaining capital expenditures

     16       37       7       7       37       4  

Sustaining leases

     3       0       0       0       0       0  

Inventory write-downs

     0       0       0       0       0       0  

All-in sustaining costs

     103       123       26       48       89       24  

Pounds sold - consolidated basis (millions pounds)

     40       36       15       26       24       15  

Cost of sales per poundb,c

     2.59       2.22       1.47       2.18       2.04       1.63  

C1 cash costs per poundb

     1.95       2.10       1.29       1.55       1.83       1.42  

All-in sustaining costs per poundb

     2.56       3.41       1.78       1.91       3.66       1.65  

 

($ millions, except per pound information in dollars)            For the years ended December 31  
      12/31/19     12/31/18     12/31/17  
      Zaldívar     Lumwana     Jabal
Sayid
    Zaldívar     Lumwana     Jabal
Sayid
    Zaldívar     Lumwana     Jabal
Sayid
 

Cost of sales

     307       361       93       261       558       98       243       396       75  

Depreciation/amortization

     (86     (100     (27     (59     (170     (19     (55     (83     (17

Treatment and refinement charges

     0       80       19       0       125       19       0       144       14  

Less: royalties and production taxesa

     0       (35     0       0       (39     (5     0       (38     0  

By-product credits

     0       0       (9     0       0       (6     0       0       (5

Other

     0       (5     0       0       (11     0       0       0       0  

C1 cash cost of sales

     221       301       76       202       463       87       188       419       67  

Rehabilitation - accretion and amortization

     5       10       0       0       16       0       0       12       0  

Royalties and production taxesa

     0       35       0       0       39       5       0       38       0  

Minesite exploration and evaluation costs

     6       0       0       2       2       0       4       2       0  

Minesite sustaining capital expenditures

     34       166       15       49       154       17       58       123       23  

Sustaining leases

     3       2       0       0       0       0       0       0       0  

Inventory write-downs

     0       0       0       0       11       0       0       0       0  

All-in sustaining costs

     269       514       91       253       685       109       250       594       90  

Pounds sold - consolidated basis (millions pounds)

     125       169       61       103       222       57       113       253       39  

Cost of sales per poundb,c

     2.46       2.13       1.53       2.55       2.51       1.73       2.15       1.57       1.90  

C1 cash costs per poundb

     1.77       1.79       1.26       1.97       2.08       1.53       1.66       1.66       1.70  

All-in sustaining costs per poundb

     2.15       3.04       1.51       2.47       3.08       1.92       2.21       2.35       2.30  

 

a.

For the three months and year ended December 31, 2019, royalties and production taxes include royalties of $8 million and $34 million, respectively (September 30, 2019: $5 million; 2018: $39 million and 2017: $38 million, respectively).

b.

Cost of sales per pound, C1 cash costs per pound and all-in sustaining costs per pound may not calculate based on amounts presented in this table due to rounding.

c.

Cost of sales per pound applicable to copper is calculated using cost of sales including our proportionate share of cost of sales attributable to equity method investments (Zaldívar and Jabal Sayid), divided by consolidated copper pounds sold (including our proportionate share of copper pounds sold from our equity method investments).

 

BARRICK YEAR-END 2019   109   MANAGEMENT’S DISCUSSION AND ANALYSIS


EBITDA and Adjusted EBITDA

EBITDA is a non-GAAP financial measure, which excludes the following from net earnings:

    Income tax expense;
    Finance costs;
    Finance income; and
    Depreciation.

Management believes that EBITDA is a valuable indicator of our ability to generate liquidity by producing operating cash flow to fund working capital needs, service debt obligations, and fund capital expenditures. Management uses EBITDA for this purpose. EBITDA is also frequently used by investors and analysts for valuation purposes whereby EBITDA is multiplied by a factor or “EBITDA multiple” that is based on an observed or inferred relationship between EBITDA and market values to determine the approximate total enterprise value of a company.

Adjusted EBITDA removes the effect of impairment charges; acquisition/disposition gains/losses; foreign currency translation gains/losses; other expense adjustments; and unrealized gains on non-hedge derivative instruments. We also remove the impact of the income tax expense, finance costs, finance income and depreciation incurred in our equity method accounted investments. We believe these items

provide a greater level of consistency with the adjusting items included in our Adjusted Net Earnings reconciliation, with the exception that these amounts are adjusted to remove any impact on finance costs/income, income tax expense and/or depreciation as they do not affect EBITDA. We believe this additional information will assist analysts, investors and other stakeholders of Barrick in better understanding our ability to generate liquidity from our full business, including equity method investments, by excluding these amounts from the calculation as they are not indicative of the performance of our core mining business and not necessarily reflective of the underlying operating results for the periods presented.

EBITDA and adjusted EBITDA are intended to provide additional information to investors and analysts and do not have any standardized definition under IFRS, and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. EBITDA and adjusted EBITDA exclude the impact of cash costs of financing activities and taxes, and the effects of changes in operating working capital balances, and therefore are not necessarily indicative of operating profit or cash flow from operations as determined under IFRS. Other companies may calculate EBITDA and adjusted EBITDA differently.

 

 

Reconciliation of Net Earnings to EBITDA and Adjusted EBITDA

(unaudited)

 

($ millions)    For the three months ended     For the years ended  
      12/31/19     9/30/19     12/31/19     12/31/18     12/31/17  

Net earnings (loss)

     1,776       2,435       4,574       (1,435     1,516  

Income tax expense

     784       791       1,783       1,198       1,231  

Finance costs, neta

     90       106       394       458       624  

Depreciation

     572       559       2,032       1,457       1,647  

EBITDA

     3,222       3,891       8,783       1,678       5,018  

Impairment charges (reversals) of long-lived assetsb

     (566     (872     (1,423     900       (212

Acquisition/disposition (gains)/lossesc

     (414     (1,901     (2,327     (68     (911

Foreign currency translation (gains)/losses

     53       40       109       136       72  

Other (income) expense adjustmentsd

     (845     53       (687     336       51  

Unrealized gains on non-hedge derivative instruments

     0       1       0       1       (1

Income tax expense, net finance costsa, and depreciation from equity investees

     112       85       378       97       98  

Adjusted EBITDA

     1,562       1,297       4,833       3,080       4,115  
  a.

Finance costs exclude accretion.

  b.

Net impairment reversals for the current year primarily relate to non-current asset reversals at Pueblo Viejo, partially offset by impairment charges at Pascua-Lama in the fourth quarter of 2019. This was further impacted by non-current asset reversals at Lumwana in the third quarter of 2019. Net impairment charges for 2018 primarily relate to non-current asset impairments at Lagunas Norte and non-current asset and goodwill impairments at Veladero.

  c.

Acquisition/disposition gains for the current year primarily relate to the gain on the sale of our 50% interest in Kalgoorlie in the fourth quarter of 2019 and the gain on the remeasurement of Turquoise Ridge to fair value as a result of its contribution to Nevada Gold Mines in the third quarter of 2019.

  d.

Other expense adjustments for the current year primarily relate to the gain on the de-recognition of the deferred revenue liability relating to our silver sale agreement with Wheaton Precious Metals Corp. and the gain on a tax settlement at Lumwana, both occurring in the fourth quarter of 2019.

 

BARRICK YEAR-END 2019   110   MANAGEMENT’S DISCUSSION AND ANALYSIS


Reconciliation of Segment Income to Segment EBITDA

(unaudited)

 

($ millions)      For the three months ended 12/31/19  
      Carlin
(61.5%)
     Cortez
(61.5%)
     Turquoise
Ridge
(61.5%)
     Nevada
Gold Mines
(61.5%)
     Pueblo
Viejo (60%)
     Loulo-
Gounkoto
(80%)
     Kibali
(45%)
     Veladero
(50%)
     Porgera
(47.5%)
     North
Maraa
 

Income

     133        69        56        277        125        65        30        21        44        52  

Depreciation

     58        36        34        163        34        58        52        29        12        35  

EBITDA

     191        105        90        440        159        123        82        50        56        87  
                                                                                              
      For the three months ended 9/30/19  
      Carlin
(61.5%)
     Cortez
(61.5%)
     Turquoise
Ridge
(61.5%)
     Nevada Gold
Mines
(61.5%)
     Pueblo
Viejo (60%)
     Loulo-
Gounkoto
(80%)
     Kibali
(45%)
     Veladero
(50%)
     Porgera
(47.5%)
     North
Maraa
 

Income

     121        77        38        237        104        64        25        14        35        20  

Depreciation

     62        32        43        166        29        61        57        25        11        11  

EBITDA

     183        109        81        403        133        125        82        39        46        31  
                                                                                              
      For the year ended 12/31/19  
      Carlinb
(61.5%)
     Cortezc
(61.5%)
     Turquoise
Ridged
(61.5%)
     Nevada
Gold Minese
(61.5%)
     Pueblo
Viejo (60%)
     Loulo-
Gounkoto
(80%)
     Kibali
(45%)
     Veladero
(50%)
     Porgera
(47.5%)
     North
Maraa
 

Income

     370        459        201        1,050        402        190        108        57        113        112  

Depreciation

     239        197        92        592        120        236        196        115        42        75  

EBITDA

     609        656        293        1,642        522        426        304        172        155        187  
                                                                                              
      For the year ended 12/31/18  
      Carlinb
(61.5%)
     Cortezc
(61.5%)
     Turquoise
Ridged
(61.5%)
     Nevada Gold
Minese
(61.5%)
     Pueblo
Viejo (60%)
     Loulo-
Gounkotof
     Kibalif      Veladero
(50%)
     Porgera
(47.5%)
     North
Maraa
 

Income

     166        726        126        1,011        342              53        56        94  

Depreciation

     262        386        28        677        115                          121        42        40  

EBITDA

     428        1,112        154        1,688        457                          174        98        134  
                                                                                              
      For the year ended 12/31/17  
      Carlinb
(61.5%)
     Cortezc
(61.5%)
     Turquoise
Ridged
(61.5%)
     Nevada Gold
Minese
(61.5%)
     Pueblo
Viejo (60%)
     Loulo-
Gounkotof
     Kibalif      Veladero
(50%)g
     Porgera
(47.5%)
     North
Maraa
 

Income

     186        873        119        1,169        395              173        83        112  

Depreciation

     260        532        28        821        143                          119        38        36  

EBITDA

     446        1,405        147        1,990        538                          292        121        148  

 

  a.

Formerly part of Acacia Mining plc. On September 17, 2019, Barrick acquired all of the shares of Acacia it did not own. The results are on a 63.9% basis until September 30, 2019 and on a 100% basis from October 1, 2019 onwards.

  b.

On July 1, 2019, Barrick’s Goldstrike and Newmont’s Carlin were contributed to Nevada Gold Mines and are now referred to as Carlin. As a result, the amounts presented represent Goldstrike on a 100% basis (including our 60% share of South Arturo) up until June 30, 2019, and the combined results of Carlin and Goldstrike (including our 60% share of South Arturo) on a 61.5% basis thereafter.

  c.

On July 1, 2019, Cortez was contributed to Nevada Gold Mines, a joint venture with Newmont. As a result, the amounts presented are on a 100% basis up until June 30, 2019, and on a 61.5% basis thereafter.

  d.

Barrick owned 75% of Turquoise Ridge through to the end of the second quarter of 2019, with our joint venture partner, Newmont, owning the remaining 25%. Turquoise Ridge was proportionately consolidated on the basis that the joint venture partners that have joint control have rights to the assets and obligations for the liabilities relating to the arrangement. The figures presented in this table are based on our 75% interest in Turquoise Ridge until June 30, 2019. On July 1, 2019, Barrick’s 75% interest in Turquoise Ridge and Newmont’s Twin Creeks and 25% interest in Turquoise Ridge were contributed to Nevada Gold Mines. Starting July 1, 2019, the results represent our 61.5% share of Turquoise Ridge and Twin Creeks, now referred to as Turquoise Ridge.

  e.

Represents the combined results of Cortez, Goldstrike (including our 60% share of South Arturo) and our 75% interest in Turquoise Ridge until June 30, 2019. Commencing July 1, 2019, the date Nevada Gold Mines was established, the results represent our 61.5% interest in Cortez, Carlin (including Goldstrike and 60% of South Arturo), Turquoise Ridge (including Twin Creeks), Phoenix and Long Canyon.

  f.

The results for 2018 and 2017 did not form a part of the Barrick consolidated results as these sites were acquired as a result of the Merger. Therefore, no comparative figures are provided.

  g.

On June 30, 2017, we sold 50% of Veladero; therefore, these represent results on a 100% basis from January 1 to June 30, 2017 and on a 50% basis from July 1, 2017 onwards.

 

BARRICK YEAR-END 2019   111   MANAGEMENT’S DISCUSSION AND ANALYSIS


Realized Price

 

Realized price is a non-GAAP financial measure which excludes from sales:

   

Unrealized gains and losses on non-hedge derivative contracts;

   

Unrealized mark-to-market gains and losses on provisional pricing from copper and gold sales contracts;

    Sales attributable to ore purchase arrangements;
    Treatment and refining charges;
    Export duties; and
   

Cumulative catch-up adjustment to revenue relating to our streaming arrangements.

Starting with this MD&A, we began adjusting for the cumulative catch-up adjustment to revenue relating to our streaming arrangements in our calculation of realized price. The prior periods have been restated to reflect this change. We believe that this additional information will assist analysts, investors and other stakeholders of Barrick to better understand our ability to generate revenue by excluding non-cash amounts from the calculation as they are not necessarily reflective of the underlying operating results for the periods presented.

This measure is intended to enable Management to better understand the price realized in each reporting period for gold and copper sales because unrealized mark-to-market values of non-hedge gold and copper derivatives are subject to change each period due to changes in market factors such as market and forward gold and copper prices, so that prices ultimately realized may differ from those recorded. The exclusion of such unrealized mark-to-market gains and losses

from the presentation of this performance measure enables investors to understand performance based on the realized proceeds of selling gold and copper production.

The gains and losses on non-hedge derivatives and receivable balances relate to instruments/balances that mature in future periods, at which time the gains and losses will become realized. The amounts of these gains and losses reflect fair values based on market valuation assumptions at the end of each period and do not necessarily represent the amounts that will become realized on maturity. We also exclude export duties that are paid upon sale and netted against revenues as well as treatment and refining charges that are paid to the refiner on gold and copper concentrate sales that are netted against revenues. We believe this provides investors and analysts with a more accurate measure with which to compare to market gold prices and to assess our gold sales performance. For those reasons, management believes that this measure provides a more accurate reflection of our Company’s past performance and is a better indicator of its expected performance in future periods.

The realized price measure is intended to provide additional information, and does not have any standardized definition under IFRS and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The measure is not necessarily indicative of sales as determined under IFRS. Other companies may calculate this measure differently. The following table reconciles realized prices to the most directly comparable IFRS measure.

 

 

Reconciliation of Sales to Realized Price per ounce/pound

(unaudited)

 

($ millions, except per ounce/pound
information in dollars)
   Gold     Copper      Gold     Copper  
      For the three months ended      For the years ended  
      12/31/19     9/30/19     12/31/19      9/30/19      12/31/19     12/31/18     12/31/17     12/31/19      12/31/18      12/31/17  

Sales

     2,758       2,585       82        45        9,186       6,600       7,631       393        512        608  

Sales applicable to non-controlling interests

     (769     (748     0        0        (1,981     (734     (810     0        0        0  

Sales applicable to equity method investmentsa,b

     139       140       147        100        543       0       0       492        442        427  

Realized non-hedge gold/copper derivative (losses) gains

     0       0       0        0        1       2       3       0        0        0  

Sales applicable to sites in care and maintenancec

     (56     (32     0        0        (140     (111     (153     0        0        0  

Treatment and refinement charges

     0       0       25        18        0       1       1       99        144        157  

Export duties

     0       0       0        0        0       (1     0       0        0        0  

Otherd

     22       0       0        0        22       12       0       0        0        0  

Revenues – as adjusted

     2,094       1,945       254        163        7,631       5,769       6,672       984        1,098        1,192  

Ounces/pounds sold (000s ounces/millions pounds)c

     1,413       1,318       91        65        5,467       4,544       5,302       355        382        405  

Realized gold/copper price per ounce/pounde

     1,483       1,476       2.76        2.55        1,396       1,270       1,258       2.77        2.88        2.95  

 

  a.

Represents sales of $130 million and $505 million, respectively, for the three months and year ended December 31, 2019 (September 30, 2019: $133 million; 2018: $nil; 2017: $nil) applicable to our 45% equity method investment in Kibali and $9 million and $39 million, respectively (September 30, 2019: $8 million; 2018: $nil; 2017: $nil) applicable to our 40% equity method investment in Morila for gold. Represents sales of $110 million and $343 million for the three months and year ended December 31, 2019 (September 30, 2019: $66 million; 2018: $300 million; 2017: $325 million) applicable to our 50% equity method investment in Zaldívar and $43 million and $168 million, respectively (September 30, 2019: $37 million; 2018: $161 million; 2017: $116 million) applicable to our 50% equity method investment in Jabal Sayid.

  b.

Sales applicable to equity method investments are net of treatment and refinement charges.

  c.

Figures exclude Pierina, Golden Sunlight and Morila starting in the third quarter of 2019, and Lagunas Norte starting in the fourth quarter of 2019 from the calculation of realized price per ounce, which are mining incidental ounces as they enter closure.

  d.

Represents cumulative catch-up adjustment to revenue relating to our streaming arrangements.

  e.

Realized price per ounce/pound may not calculate based on amounts presented in this table due to rounding.

 

BARRICK YEAR-END 2019   112   MANAGEMENT’S DISCUSSION AND ANALYSIS


TECHNICAL INFORMATION

The scientific and technical information contained in this MD&A has been reviewed and approved by Steven Yopps, MMSA, Director - Metallurgy, North America; Craig Fiddes, North America Resource Modeling Manager; Chad Yuhasz, P.Geo, Mineral Resource Manager, Latin America and Australia Pacific; Simon Bottoms, CGeol, MGeol, FGS, MAusIMM, Mineral Resources Manager: Africa and Middle East; Rodney Quick, MSc, Pr. Sci.Nat, Mineral Resource Management and Evaluation Executive; John Steele, CIM, Metallurgy, Engineering and Capital Projects Executive; and Rob Krcmarov, FAusIMM, Executive Vice President, Exploration and Growth – each a “Qualified Person” as defined in National Instrument 43-101Standards of Disclosure for Mineral Projects.

All mineral reserve and mineral resource estimates are estimated in accordance with National Instrument 43-101Standards of Disclosure for Mineral Projects. Unless otherwise noted, such mineral reserve and mineral resource estimates are as of December 31, 2019.

 

 

ENDNOTES

 

1

A Tier One Gold Asset is a mine with a stated life in excess of 10 years, annual production of at least 500,000 ounces of gold and total cash costs per ounce over the mine life that are in the lower half of the industry cost curve.

 

2

A Tier Two Gold Asset is a mine with a stated life in excess of 10 years, annual production of at least 250,000 ounces of gold and total cash costs per ounce over the mine life that are in the lower half of the industry cost curve. A Strategic Asset is an asset which in the opinion of Barrick, has the potential to deliver significant unrealized value in the future.

 

3

Currently consists of Barrick’s Lumwana mine and Zaldívar and Jabal Sayid copper joint ventures.

 

4

These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure to the most directly comparable IFRS measure, please see pages 91 to 112 of this MD&A.

 

5

Cost of sales applicable to gold per ounce is calculated using cost of sales applicable to gold on an attributable basis (removing the non-controlling interest of 40% Pueblo Viejo, 36.1% Tanzania until September 30, 2019 (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience) and 40% South Arturo from cost of sales (63.1% of South Arturo from July 1, 2019 onwards as a result of its contribution to Nevada Gold Mines)), divided by attributable gold ounces. The non-controlling interest of 20% Loulo-Gounkoto and 10.3% of Tongon is also removed from cost of sales and our proportionate share of cost of sales attributable to equity method investments (Kibali and Morila) is included commencing January 1, 2019, the effective date of the Merger. Also removes the non-controlling interest of 38.5% Nevada Gold Mines from cost of sales from July 1, 2019 onwards. Cost of sales applicable to copper per pound is calculated using cost of sales applicable to copper including our proportionate share of cost of sales attributable to equity method investments (Zaldívar and Jabal Sayid), divided by consolidated copper pounds (including our proportionate share of copper pounds from our equity method investments).

 

6

Total reportable incident frequency rate (“TRIFR”) is a ratio calculated as follows: number of reportable injuries x 1,000,000 hours divided by the total number of hours worked. Reportable injuries include fatalities, lost time injuries, restricted duty injuries, and medically treated injuries.

 

7

Class 1 - High Significance is defined as an incident that causes significant negative impacts on human health or the environment or an incident that extends onto publicly accessible land and has the potential to cause significant adverse impact to surrounding communities, livestock or wildlife.

 

8

Class 2 - Medium Significance is defined as an incident that has the potential to cause negative impact on human health or the environment but is reasonably anticipated to result in only localized and short-term environmental or community impact requiring minor remediation.

 

9

Estimated in accordance with National Instrument 43-101 as required by Canadian securities regulatory authorities. Estimates are as of December 31, 2019, unless otherwise noted. Proven reserves of 280 million tonnes grading 2.42 g/t, representing 22 million ounces of gold, and 420 million tonnes grading 0.4%, representing 3,700 million pounds of copper. Probable reserves of 1,000 million tonnes grading 1.48 g/t, representing 49 million ounces of gold, and 1,200 million tonnes grading 0.38%, representing 9,800 million pounds of copper. Measured resources of 530 million tonnes grading 2.21 g/t, representing 37 million ounces of gold, and 660 million tonnes grading 0.38%, representing 5,500 million pounds of copper. Indicated resources of 2,800 million tonnes grading 1.43 g/t, representing 130 million ounces of gold, and 2,400 million tonnes grading 0.38%, representing 21,000 million pounds of copper. Inferred resources of 940 million tonnes grading 1.3 g/t, representing 39 million ounces of gold, and 430 million tonnes grading 0.2%, representing 2,200 million pounds of copper. Complete mineral reserve and mineral resource data for all mines and projects referenced in this MD&A, including tonnes, grades, and ounces, can be found on pages 119-129 of Barrick’s Fourth Quarter and Year-End 2019 Report.

 

10

Estimated in accordance with National Instrument 43-101 as required by Canadian securities regulatory authorities. Estimates are as of December 31, 2018, unless otherwise noted. Proven reserves of 344.6 million tonnes grading 2.15 g/t, representing 23.9 million ounces of gold and probable reserves of 0.9 billion tonnes grading 1.33 g/t, representing 38.4 million ounces of

 

BARRICK YEAR-END 2019   113   MANAGEMENT’S DISCUSSION AND ANALYSIS


 

gold. 11 billion pounds of copper reserves were comprised of proven reserves of 285.6 million tonnes grading 0.43%, representing 2.7 billion pounds of copper and probable reserves of 940.0 million tonnes grading 0.38%, representing 7.9 billion pounds of copper. Complete 2018 mineral reserve and mineral resource data for all mines and projects referenced in this MD&A, including tonnes, grades, and ounces, can be found on pages 35-41 of Barrick’s Annual Information Form/Form 40-F for the year ended December 31, 2018 on file with Canadian provincial securities regulatory authorities and the U.S. Securities and Exchange Commission.

 

11

The term “Acacia Exploration Special Dividends” refers to special dividends potentially payable by Barrick to former shareholders of Acacia, as a consequence of the sales process to realize value from the sale (if any) of certain of Acacia’s exploration assets located in the Republic of Kenya, the Republic of Mali and Burkina Faso, and excluding the sale of Acacia’s interests in the Nyanzaga Gold Project in Tanzania and the South Houndé Project in Burkina Faso, for which Acacia had already commenced and advanced sales processes.

 

12

See the Technical Report on the Turquoise Ridge mine, dated March 19, 2019, and filed on SEDAR at www.sedar.com and EDGAR at www.sec.gov on March 23, 2019.

 

13

See the Technical Report on the Pueblo Viejo mine, Sanchez Ramirez Province, Dominican Republic, dated March 19, 2018, and filed on SEDAR at www.sedar.com and EDGAR at www.sec.gov on March 23, 2018.

 

14

Carlin Trend Exploration Significant Intercepts1

 

 
Drill Results from Q4 2019
           
Drill Hole    Azimuth    Dip   Interval (m)    Width (m)2    Au (g/t)      

RAN-02349

   0    (90)   538.0 - 541.5    3.5    7.50      
        507.8 - 509.2    1.4    5.33      

RAN-02355

   0    (90)   516.0 - 516.9    0.9    5.93      
              520.6 - 526.7    6.1    8.52      

 

  1.

All intercepts calculated using a 5 g/t Au cutoff and are uncapped; minimum intercept width is 0.8 m; internal dilution is less than 20% total width.

  2.

True widths of intercepts are uncertain at this stage, geometry of orebody is unconstrained.

The drilling results for the Carlin Trend exploration area in this MD&A have been prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. All drill hole assay information has been manually reviewed and approved by staff geologists and re-checked by the project manager. Sample preparation and analyses are conducted by ALS Minerals. Procedures are employed to ensure security of samples during their delivery from the drill rig to the laboratory. The quality assurance procedures, data verification and assay protocols used in connection with drilling and sampling on the Carlin Trend conform to industry accepted quality control methods.

 

BARRICK YEAR-END 2019   114   MANAGEMENT’S DISCUSSION AND ANALYSIS


 
Historic Drill Results1
           
Drill Hole    Azimuth    Dip   Interval (m)    Width (m)2    Au (g/t)      

DPC-0241

   072    (57)   160.9 - 165.5    4.6    7.48      
  168.5 - 179.2    10.7    10.57      
  199.0 - 200.5    1.5    6.91      
  212.8 - 217.5    4.7    10.82      
  229.5 - 231.0    1.5    6.42      
  243.2 - 244.7    1.5    5.17      
  273.7 - 276.8    3.1    8.75      
  334.7 - 365.2    30.5    15.86      
  369.7 - 396.2    26.5    11.24      
  421.5 - 430.6    9.1    5.89      
           

DSU-00190

   105    (60)   379.5 - 388.5    9.0    12.81      

GEN-017033

   105    (75)   271.6 - 274.1    2.5    8.46      
  296.3 - 297.7    1.4    5.47      
  302.1 - 303.0    0.9    10.7      
  307.3 - 308.8    1.5    5.28      
  316.2 - 320.8    4.0    11.08      
  326.8 - 352.5    24.7    8.56      

U12-P05-16

   059    (30)   141.7 - 144.8    3.1    8.09      
  370.3 - 371.8    1.5    5.93      
  376.4 - 391.7    15.3    7.14      
  394.7 - 396.2    1.5    5.27      
  397.8 - 400.8    3.0    6.15      

GB-681CM4

   0    (90)   608.1 - 614.2    6.1    23.17      
  620.3 - 621.8    1.5    17.29      
  661.4 - 662.9    1.5    7.19      
  725.4 - 730.0    4.6    8.58      
  736.1 - 739.2    3.1    6.73      
  740.7 - 742.2    1.5    5.99      
  763.5 - 765.0    1.5    10.79      

U17-M05-02

   075    (45)   7.6 - 9.1    1.5    5.08      
  13.7 - 21.3    7.6    7.82      
  193.6 - 202.7    9.1    21.02      

 

  1.

All intercepts are from legacy drilling, completed prior to 2019.

  2.

True widths of intercepts are uncertain at this stage, geometry of orebody is unconstrained.

  3.

Interval vs. width discrepancy is due to sub-meter no recovery zone internal to intercept.

  4.

Laboratory unknown.

The drilling results for the Carlin Trend exploration area in this MD&A have been prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. All drill hole assay information has been manually reviewed and approved by staff geologists and re-checked by the project manager. Sample preparation and analyses are conducted by ALS Minerals or predecessor companies. Procedures are employed to ensure security of samples during their delivery from the drill rig to the laboratory. The quality assurance procedures, data verification and assay protocols used in connection with drilling and sampling on the Carlin Trend conform to industry accepted quality control methods.

 

BARRICK YEAR-END 2019   115   MANAGEMENT’S DISCUSSION AND ANALYSIS


15

Fourmile Significant Intercepts1

 

 
Drill Results from Q4 2019
Drill Hole2    Azimuth    Dip   Interval (m)    Width (m)3    Au (g/t)      

FM19-14D

   233    (73)   1100.3 - 1103.3    3    6.2      
  1148.0 - 1155.5    7.5    9.2      
  1169.3 - 1162.8    1.5    9.3      
  1234.7 - 1236.2    1.5    7.5      
  1239.3 - 1242.3    3    47.8      
  1259.1 - 1260.6    1.5    7.0      
  1301.8 - 1303.3    1.5    20.2      
  1309.4 - 1310.9    1.5    16.3      
  1333.8 - 1337.5    3.7    86.2      
  1343.5 - 1345.2    1.7    29.6      
  1356.6 - 1361.2    4.6    42.5      
  1372.8 - 1375.5    2.7    180.3      

FM19-26D4

   65    (75)   717.8 - 719.2    1.4    5.2      
  774.8 - 776.3    1.5    18.5      

FM19-40D

   173    (84)   870.2 - 871.7    1.5    10.4      
  883 - 895.5    12.5    31.2      
  904.4 - 926    21.6    24.9      

FM19-61D

   251    (86)   835.2 - 854.7    19.5    17.9      
  863.5 - 872.0    8.5    10.4      
  889.7 - 891.5    1.8    6.5      
  892.9 - 894.0    1.1    10.8      
  898.9 - 901.9    3.0    6.5      
  957.1 - 959.5    2.4    14.8      

FM19-64D

   119    (85)   881.7 - 885.1    3.4    15.9      

FM19-68D

   166    (77)   1092.1 - 1096.5    4.4    18.1      

 

  1.

All intercepts calculated using a 5 g/t Au cutoff and are uncapped; minimum intercept width is 0.8 m; internal dilution is less than 20% total width.

  2.

Fourmile drill hole nomenclature: FM (Fourmile) followed by the year (19 for 2019) or GRC (Gold Rush Core) with no designation of the year.

  3.

True widths of intercepts are uncertain at this stage.

  4.

Partial results reported in Q2 2019.

The drilling results for the Fourmile property contained in this MD&A have been prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. All drill hole assay information has been manually reviewed and approved by staff geologists and re-checked by the project manager. Sample preparation and analyses are conducted by ALS Minerals. Procedures are employed to ensure security of samples during their delivery from the drill rig to the laboratory. The quality assurance procedures, data verification and assay protocols used in connection with drilling and sampling on the Fourmile property conform to industry accepted quality control methods.

 

16

Bambadji Significant Intercepts1

 

 
Drill Results from Q4 2019
           
Drill Hole2    Azimuth    Dip   Interval (m)    Width (m)3    Au (g/t)      

GFRC007

   90    (50)   6.0 - 19.0    13.00    1.31      

GFRC008

   90    (50)   22.0 - 52.0    30.00    1.06      

GFRC009

   90    (50)   7.0 - 33.0    26.00    0.55      

GFRC013

   90    (50)   19.0 - 26.0    8.00    0.68      

GFRC029

   90    (50)   26.0 - 30.0    4.00    5.15      

GFRC031

   90    (50)   41.0 - 48.0    7.00    16.72      

 

  1.

All intercepts calculated using a 0.5 g/t Au cutoff and are uncapped; minimum intercept width is 2 m; internal dilution is less than 2 m total width.

  2.

Gefa drill hole nomenclature: prospect initial GF (Gefa), followed by type of drilling RC (Reverse Circulation) and DH (Diamond Drilling).

  3.

True widths of intercepts are uncertain at this stage.

 

BARRICK YEAR-END 2019   116   MANAGEMENT’S DISCUSSION AND ANALYSIS


The drilling results for the Bambadji property contained in this MD&A have been prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. All drill hole assay information has been manually reviewed and approved by staff geologists and re-checked by the project manager. Sample preparation and analyses are conducted by SGS, an independent laboratory. Industry accepted best practices for preparation and fire assaying procedures are utilized to determine gold content. Procedures are employed to ensure security of samples during their delivery from the drill rig to the laboratory. The quality assurance procedures, data verification and assay protocols used in connection with drilling and sampling on the Bambadji property conform to industry accepted quality control methods.

 

17

See the Technical Report on the Loulo-Gounkoto Gold Mine Complex, Mali, dated September 18, 2018, with an effective date of December 31, 2017, and filed on SEDAR at www.sedar.com and EDGAR at www.sec.gov on January 2, 2019.

 

18

See the Technical Report on the Kibali Gold Mine, Republic of Congo, dated September 18, 2018, with an effective date of December 31, 2017, and filed on SEDAR at www.sedar.com and EDGAR at www.sec.gov on January 2, 2019.

 

BARRICK YEAR-END 2019   117   MANAGEMENT’S DISCUSSION AND ANALYSIS


GLOSSARY OF TECHNICAL TERMS

 

ALL-IN SUSTAINING COSTS: A non-GAAP measure of cost per ounce/pound for gold/copper. Refer to page 93 of this MD&A for further information and a reconciliation of the measure.

AUTOCLAVE: Oxidation process in which high temperatures and pressures are applied to convert refractory sulfide mineralization into amenable oxide ore.

BY-PRODUCT: A secondary metal or mineral product recovered in the milling process such as silver.

C1 CASH COSTS: A non-GAAP measure of cost per pound for copper. Refer to page 108 of this MD&A for further information and a reconciliation of the measure.

CONCENTRATE: A very fine, powder-like product containing the valuable ore mineral from which most of the waste mineral has been eliminated.

CONTAINED OUNCES: Represents ounces in the ground before loss of ounces not able to be recovered by the applicable metallurgical process.

DEVELOPMENT: Work carried out for the purpose of gaining access to an ore body. In an underground mine this includes shaft sinking, crosscutting, drifting and raising. In an open pit mine, development includes the removal of overburden.

DILUTION: The effect of waste or low-grade ore which is unavoidably included in the mined ore, lowering the recovered grade.

DORÉ: Unrefined gold and silver bullion bars usually consisting of approximately 90 percent precious metals that will be further refined to almost pure metal.

DRILLING:

Core: drilling with a hollow bit with a diamond cutting rim to produce a cylindrical core that is used for geological study and assays. Used in mineral exploration.

In-fill: drilling closer spaced holes in between existing holes, used to provide greater geological detail and to help establish reserve estimates.

EXPLORATION: Prospecting, sampling, mapping, diamond-drilling and other work involved in searching for ore.

FREE CASH FLOW: A non-GAAP measure that reflects our ability to generate cash flow. Refer to page 91 of this MD&A for a definition.

GRADE: The amount of metal in each tonne of ore, expressed as grams per tonne for precious metals and as a percentage for most other metals.

Cut-off grade: the minimum metal grade at which an ore body can be economically mined (used in the calculation of ore reserves).

Mill-head grade: metal content per tonne of ore going into a mill for processing. (g/t)

Reserve grade: estimated metal content of an ore body, based on reserve calculations.

 

HEAP LEACHING: A process whereby gold/copper is extracted by “heaping” broken ore on sloping impermeable pads and continually applying to the heaps a weak cyanide solution/sulfuric acid which dissolves the contained gold/copper. The gold/copper-laden solution is then collected for gold/copper recovery.

HEAP LEACH PAD: A large impermeable foundation or pad used as a base for ore during heap leaching.

MILL: A processing facility where ore is finely ground and thereafter undergoes physical or chemical treatment to extract the valuable metals.

MINERAL RESERVE: See pages 119 to 129 – Summary Gold/Copper Mineral Reserves and Mineral Resources.

MINERAL RESOURCE: See pages 119 to 129 – Summary Gold/Copper Mineral Reserves and Mineral Resources.

OPEN PIT: A mine where the minerals are mined entirely from the surface.

ORE: Rock, generally containing metallic or non-metallic minerals, which can be mined and processed at a profit.

ORE BODY: A sufficiently large amount of ore that can be mined economically.

OUNCES: Troy ounce is a unit of measure used for weighing gold at 999.9 parts per thousand purity and is equivalent to 31.1035g.

RECLAMATION: The process by which lands disturbed as a result of mining activity are modified to support beneficial land use. Reclamation activity may include the removal of buildings, equipment, machinery and other physical remnants of mining, closure of tailings storage facilities, leach pads and other mine features, and contouring, covering and re-vegetation of waste rock and other disturbed areas.

RECOVERY RATE: A term used in process metallurgy to indicate the proportion of valuable material physically recovered in the processing of ore. It is generally stated as a percentage of the valuable material recovered compared to the total material originally contained.

REFINING: The final stage of metal production in which impurities are removed from the molten metal.

STRIPPING: Removal of overburden or waste rock overlying an ore body in preparation for mining by open pit methods.

TAILINGS: The material that remains after all economically and technically recoverable precious metals have been removed from the ore during processing.

TOTAL CASH COSTS: A non-GAAP measure of cost per ounce for gold. Refer to page 93 of this MD&A for further information and a reconciliation of the measure.

 

 

BARRICK YEAR-END 2019   118   MANAGEMENT’S DISCUSSION AND ANALYSIS


Mineral Reserves and Mineral Resources

 

GOLD MINERAL RESERVES 1,2,3                                                                
As at December 31, 2019    PROVEN             PROBABLE             TOTAL  
     Tonnes      Grade      Contained
ozs
            Tonnes      Grade      Contained
ozs
            Tonnes      Grade      Contained
ozs
 
 Based on attributable ounces    (Mt)      (g/t)      (Moz)             (Mt)      (g/t)      (Moz)             (Mt)      (g/t)      (Moz)  

AFRICA AND MIDDLE EAST

                                

Kibali surface

     3.5        2.49        0.28           7.1        3.14        0.71           11        2.92        0.99  

Kibali underground

     5.8        5.13        0.95           14        4.76        2.2           20        4.87        3.2  

Kibali (45.00%) total

     9.3        4.13        1.2           22        4.23        2.9           31        4.20        4.2  

Loulo-Gounkoto surface

     8.4        2.95        0.80           9.7        3.56        1.1           18        3.28        1.9  

Loulo-Gounkoto underground

     9.0        4.64        1.3           18        5.41        3.2           27        5.16        4.5  

Loulo-Gounkoto (80.00%) total

     17        3.83        2.1           28        4.77        4.3           45        4.41        6.4  

Tongon surface (89.70%)

     4.3        1.94        0.27           4.6        2.33        0.35           8.9        2.14        0.61  

Massawa surface (83.25%) 4

                             17        3.94        2.2           17        3.94        2.2  

Bulyanhulu surface 5,6

                             1.1        1.19        0.041           1.1        1.19        0.041  

Bulyanhulu underground 5,6

     2.0        11.01        0.72           4.4        10.56        1.5           6.4        10.70        2.2  

Bulyanhulu (84.00%) total 5,6

     2.0        11.01        0.72           5.5        8.72        1.5           7.5        9.34        2.2  

North Mara surface 6

     0.34        2.63        0.029           15        1.47        0.70           15        1.49        0.73  

North Mara underground 6

     0.77        5.39        0.13           5.0        5.40        0.87           5.8        5.40        1.0  

North Mara (84.00%) total 6

     1.1        4.54        0.16           20        2.46        1.6           21        2.57        1.7  

Buzwagi surface (84.00%) 6

                             5.1        0.84        0.14           5.1        0.84        0.14  

Jabal Sayid surface (50.00%)

     7.2        0.20        0.046           5.4        0.29        0.051           13        0.24        0.097  

AFRICA AND MIDDLE EAST TOTAL

     41        3.44        4.6           110        3.78        13           150        3.69        18  

NORTH AMERICA

                                

Hemlo surface

                             1.6        1.28        0.066           1.6        1.28        0.066  

Hemlo underground

     0.91        4.94        0.15           8.1        4.30        1.1           9.0        4.37        1.3  

Hemlo (100%) total

     0.91        4.94        0.15           9.7        3.81        1.2           11        3.90        1.3  

Long Canyon surface (61.50%)

     0.26        2.23        0.019           4.6        2.49        0.37           4.9        2.48        0.39  

Phoenix surface (61.50%)

     9.4        0.66        0.20           94        0.59        1.8           100        0.59        2.0  

Carlin surface

     43        2.70        3.7           60        1.75        3.4           100        2.15        7.1  

Carlin underground

     13        9.75        4.2           5.9        9.23        1.7           19        9.59        5.9  

Carlin (61.50%) total

     56        4.37        7.9           65        2.42        5.1           120        3.32        13  

Cortez surface

     4.4        2.40        0.34           53        1.26        2.1           57        1.35        2.5  

Cortez underground 7

     0.59        9.61        0.18           11        9.93        3.4           11        9.91        3.6  

Cortez (61.50%) total

     5.0        3.25        0.52           64        2.73        5.6           69        2.77        6.1  

Turquoise Ridge surface

     18        2.02        1.2           16        1.86        0.94           34        1.95        2.1  

Turquoise Ridge underground

     9.8        11.55        3.6           7.8        10.08        2.5           18        10.90        6.2  

Turquoise Ridge (61.50%) total

     28        5.38        4.8           23        4.59        3.5           51        5.02        8.3  

NORTH AMERICA TOTAL

     99        4.25        14           260        2.08        17           360        2.68        31  

 

BARRICK YEAR-END 2019   119   RESERVES AND RESOURCES


GOLD MINERAL RESERVES 1,2,3                                                   
As at December 31, 2019    PROVEN             PROBABLE             TOTAL  
     Tonnes      Grade      Contained
ozs
               Tonnes      Grade      Contained
ozs
               Tonnes      Grade      Contained
ozs
 
 Based on attributable ounces    (Mt)      (g/t)      (Moz)             (Mt)      (g/t)      (Moz)             (Mt)      (g/t)      (Moz)  

LATIN AMERICA AND ASIA PACIFIC

 

                             

Norte Abierto surface (50.00%)

     110        0.65        2.4           480        0.59        9.2           600        0.60        12  

Pueblo Viejo surface (60.00%)

     10        2.68        0.87           61        2.46        4.8           71        2.49        5.7  

Veladero surface (50.00%)

     15        0.60        0.30           110        0.74        2.5           120        0.73        2.8  

Porgera surface

                             8.5        3.63        0.99           8.5        3.63        0.99  

Porgera underground

     1.3        6.68        0.29           5.3        6.25        1.1           6.6        6.33        1.3  

Porgera (47.50%) total

     1.3        6.68        0.29           14        4.63        2.1           15        4.81        2.3  

LATIN AMERICA AND ASIA PACIFIC TOTAL

     140        0.84        3.8           660        0.87        19           810        0.87        22  

    

                                                                                      

TOTAL

     280        2.42        22           1,000        1.48        49           1,300        1.68        71  

1 See accompanying Mineral Reserves and Mineral Resources endnote #1.

2 See accompanying Mineral Reserves and Mineral Resources endnote #2.

3 See accompanying Mineral Reserves and Mineral Resources endnote #4.

4 See accompanying Mineral Reserves and Mineral Resources endnote #9.

5 See accompanying Mineral Reserves and Mineral Resources endnote #15.

6 See accompanying Mineral Reserves and Mineral Resources endnote #10.

7 See accompanying Mineral Reserves and Mineral Resources endnote #17.

 

COPPER MINERAL RESERVES 1,2,3,4                                                          

As at December 31, 2019

     PROVEN           PROBABLE           TOTAL  
     Tonnes      Cu
Grade
     Contained
Cu
               Tonnes      Cu
Grade
     Contained
Cu
               Tonnes      Cu
Grade
     Contained
Cu
 
Based on attributable pounds    (Mt)      (%)      (Mlb)             (Mt)      (%)      (Mlb)             (Mt)      (%)      (Mlb)  

AFRICA AND MIDDLE EAST

                                

Bulyanhulu underground (84.00%) 5,6

     2.0        0.53        24           4.4        0.56        54           6.4        0.55        77  

Lumwana surface (100%)

     58        0.50        640           480        0.56        6,000           540        0.56        6,600  

Jabal Sayid surface

     0.079        3.21        5.6                                   0.079        3.21        5.6  

Jabal Sayid underground

     7.1        2.44        380           5.4        2.09        250           13        2.29        630  

Jabal Sayid (50.00%) total

     7.2        2.45        390           5.4        2.09        250           13        2.29        640  

AFRICA AND MIDDLE EAST TOTAL

     67        0.71        1,100           490        0.58        6,300           560        0.59        7,300  

NORTH AMERICA

                                

Phoenix surface (61.50%)

     27        0.19        120           130        0.17        490           160        0.18        610  

NORTH AMERICA TOTAL

     27        0.19        120           130        0.17        490           160        0.18        610  

LATIN AMERICA AND ASIA PACIFIC

 

                             

Zaldívar surface (50.00%)

     220        0.43        2,100           69        0.42        640           280        0.43        2,700  

Norte Abierto surface (50.00%)

     110        0.19        480           480        0.23        2400           600        0.22        2,900  

LATIN AMERICA AND ASIA PACIFIC TOTAL

     330        0.35        2,500           550        0.25        3,000           880        0.29        5,600  

    

                                                                                      

TOTAL

     420        0.4        3,700           1,200        0.38        9,800           1,600        0.38        13,000  

1 See accompanying Mineral Reserves and Mineral Resources endnote #1.    

2 See accompanying Mineral Reserves and Mineral Resources endnote #2.    

3 See accompanying Mineral Reserves and Mineral Resources endnote #7.    

4 See accompanying Mineral Reserves and Mineral Resources endnote #4.    

5 See accompanying Mineral Reserves and Mineral Resources endnote #15.    

6 See accompanying Mineral Reserves and Mineral Resources endnote #10.    

 

BARRICK YEAR-END 2019   120   RESERVES AND RESOURCES


SILVER MINERAL RESERVES 1,2,3,4                                                          
As at December 31, 2019    PROVEN             PROBABLE             TOTAL  
     Tonnes      Ag
Grade
     Contained
Ag
               Tonnes      Ag
Grade
     Contained
Ag
               Tonnes      Ag
Grade
     Contained
Ag
 
 Based on attributable ounces    (Mt)      (g/t)      (Moz)             (Mt)      (g/t)      (Moz)             (Mt)      (g/t)      (Moz)  

AFRICA AND MIDDLE EAST

                                

Bulyanhulu underground (84.00%) 5,6

     2.0        8.91        0.58           4.4        6.19        0.87           6.4        7.05        1.5  

AFRICA AND MIDDLE EAST TOTAL

     2.0        8.91        0.58           4.4        6.19        0.87           6.4        7.05        1.5  

NORTH AMERICA

                                

Phoenix surface (61.50%)

     9.4        8.18        2.5           94        6.99        21           100        7.10        24  

NORTH AMERICA TOTAL

     9.4        8.18        2.5           94        6.99        21           100        7.10        24  

LATIN AMERICA AND ASIA PACIFIC

                                

Pueblo Viejo surface (60.00%)

     10        14.45        4.7           61        16.30        32           71        16.04        37  

Norte Abierto surface (50.00%)

     110        1.91        7.0           480        1.43        22           600        1.52        29  

Veladero surface (50.00%)

     15        12.68        6.2           110        14.27        48           120        14.07        54  

LATIN AMERICA AND ASIA PACIFIC TOTAL

     140        3.99        18           650        4.91        100           790        4.75        120  

    

                                                                                      

TOTAL

     150        4.31        21           750        5.18        120           900        5.03        150  

1 See accompanying Mineral Reserves and Mineral Resources endnote #1.    

2 See accompanying Mineral Reserves and Mineral Resources endnote #2.    

3 See accompanying Mineral Reserves and Mineral Resources endnote #7.    

4 See accompanying Mineral Reserves and Mineral Resources endnote #4.    

5 See accompanying Mineral Reserves and Mineral Resources endnote #15.    

6 See accompanying Mineral Reserves and Mineral Resources endnote #10.    

 

BARRICK YEAR-END 2019   121   RESERVES AND RESOURCES


GOLD MINERAL RESOURCES 1,2,3,4                                                                     
As at December 31, 2019    MEASURED (M) 5,6             INDICATED (I) 5,7             (M) + (I) 5,6,7             INFERRED 8  
     Tonnes      Grade      Contained
ozs
           Tonnes      Grade      Contained
ozs
           Contained
ozs
           Tonnes      Grade      Contained
ozs
 
                                                                                            
 Based on attributable ounces    (Mt)      (g/t)      (Moz)            (Mt)      (g/t)      (Moz)            (Moz)            (Mt)      (g/t)      (Moz)  

AFRICA AND MIDDLE EAST

                                   

Kibali surface

     5.3        2.43        0.42          15        2.63        1.3          1.7          5.0        2.0        0.32  

Kibali underground

     9.2        4.94        1.5          28        3.66        3.3          4.8          7.0        4.1        0.93  

Kibali (45.00%) total

     14        4.02        1.9          43        3.30        4.6          6.5          12        3.2        1.2  

Loulo-Gounkoto surface

     9.9        3.06        0.98          15        3.44        1.6          2.6          3.3        2.9        0.31  

Loulo-Gounkoto underground

     14        4.79        2.2          21        5.55        3.8          6.0          12        4.1        1.6  

Loulo-Gounkoto (80.00%) total

     24        4.09        3.2          36        4.69        5.4          8.6          15        3.9        1.9  

Tongon surface (89.70%)

     4.6        2.05        0.31          11        2.43        0.86          1.2          5.3        2.4        0.41  

Massawa surface 9

                            19        4.00        2.5          2.5          3.1        2.2        0.22  

Massawa underground 9

                                                            2.2        4.1        0.29  

Massawa (83.25%) 9

                            19        4.00        2.5          2.5          5.3        3.0        0.51  

Bulyanhulu surface 10

                            1.1        1.19        0.041          0.041                         

Bulyanhulu underground 10

     3.1        12.55        1.3          9.8        8.99        2.8          4.1          13        11.8        4.8  

Bulyanhulu (84.00%) total 10

     3.1        12.55        1.3          11        8.22        2.9          4.1          13        11.8        4.8  

North Mara surface 10

     2.3        2.37        0.18          27        1.73        1.5          1.7          1.8        1.1        0.060  

North Mara underground 10

     0.74        6.13        0.15          10        4.57        1.5          1.7          6.3        4.5        0.91  

North Mara (84.00%) total 10

     3.1        3.28        0.32          37        2.52        3.0          3.3          8.1        3.7        0.97  

Buzwagi surface (84.00%) 10

                            7.9        0.99        0.25          0.25          20        0.9        0.56  

Jabal Sayid surface (50.00%)

     7.6        0.24        0.057          7.1        0.40        0.092          0.15          2.2        0.6        0.041  

AFRICA AND MIDDLE EAST TOTAL

     57        3.81        7.0          170        3.52        19          27          81        4.0        10  

NORTH AMERICA

                                   

Carlin surface

     47        2.59        3.9          130        1.48        6.4          10          12        1.1        0.40  

Carlin underground

     21        8.23        5.6          10        7.67        2.6          8.2          3.2        8.0        0.82  

Carlin (61.50%) total

     68        4.35        9.5          140        1.93        8.9          18          15        2.6        1.2  

Cortez surface

     5.0        2.33        0.38          75        1.33        3.2          3.6          43        0.6        0.89  

Cortez underground 11

     0.90        8.41        0.24          36        8.09        9.3          9.5          5.5        7.7        1.4  

Cortez (61.50%) total

     5.9        3.26        0.62          110        3.51        12          13          49        1.4        2.2  

Donlin surface (50.00%)

     3.9        2.52        0.31          270        2.24        19          20          46        2.0        3.0  

Hemlo surface

                            32        1.91        2.0          2.0          3.0        1.0        0.096  

Hemlo underground

     1.8        4.25        0.25          8.6        3.19        0.88          1.1          6.0        4.7        0.91  

Hemlo (100%) total

     1.8        4.25        0.25          41        2.18        2.9          3.1          9.1        3.5        1.0  

Long Canyon surface

     0.65        2.79        0.059          10        2.65        0.89          0.95          1.6        1.6        0.083  

Long Canyon underground

     0.085        11.80        0.032          1.1        9.29        0.33          0.36          0.20        6.1        0.039  

Long Canyon (61.50%) total

     0.74        3.83        0.091          12        3.29        1.2          1.3          1.8        2.1        0.12  

Turquoise Ridge surface

     24        2.06        1.6          32        1.96        2.0          3.6          11        1.6        0.57  

Turquoise Ridge underground

     14        10.00        4.4          10        9.09        3.0          7.4          1.8        9.1        0.53  

Turquoise Ridge (61.50%) total

     38        4.95        6.0          42        3.72        5.0          11          13        2.7        1.1  

Phoenix surface (61.50%)

     15        0.60        0.28          180        0.53        3.1          3.4          12        0.4        0.15  

Fourmile underground (100%)

                                                            5.4        10.9        1.9  

NORTH AMERICA TOTAL

     130        4.00        17          800        2.06        53          70          150        2.2        11  

 

BARRICK YEAR-END 2019   122   RESERVES AND RESOURCES


GOLD MINERAL RESOURCES 1,2,3,4                                                                        
As at December 31, 2019    MEASURED (M) 5,6             INDICATED (I) 5,7             (M) + (I) 5,6,7             INFERRED 8  
     Tonnes      Grade      Contained
ozs
            Tonnes      Grade      Contained
ozs
            Contained
ozs
            Tonnes      Grade      Contained
ozs
 
                                                                                               
 Based on attributable ounces    (Mt)      (g/t)      (Moz)             (Mt)      (g/t)      (Moz)             (Moz)             (Mt)      (g/t)      (Moz)  

LATIN AMERICA AND ASIA PACIFIC

                                      

Pueblo Viejo surface (60.00%)

     80        2.41        6.2           120        2.25        9.0           15           33        2.1        2.2  

Norte Abierto surface (50.00%)

     190        0.63        3.9           1,100        0.53        19           22           370        0.4        4.4  

Pascua Lama surface (100%)

     43        1.86        2.6           390        1.49        19           21           15        1.7        0.86  

Veladero surface (50.00%)

     18        0.56        0.33           180        0.63        3.6           4.0           20        0.7        0.42  

Lagunas Norte surface (100%)

     1.4        0.94        0.043           57        2.31        4.2           4.3           1.4        1.1        0.050  

Alturas surface (100%)

                                                               260        1.1        8.9  

Porgera surface

                             15        3.24        1.6           1.6           7.1        2.6        0.58  

Porgera underground

     1.5        6.57        0.31           8.7        6.16        1.7           2.0           2.8        6.5        0.57  

Porgera (47.50%) total

     1.5        6.57        0.31           24        4.30        3.3           3.6           9.8        3.7        1.2  

LATIN AMERICA AND ASIA PACIFIC TOTAL

     340        1.24        13           1,900        0.96        58           71           710        0.8        18  

    

                                                                                                  

TOTAL

     530        2.21        37           2,800        1.43        130           170           940        1.3        39  

1 Mineral resources which are not mineral reserves do not have demonstrated economic viability.

2 See accompanying Mineral Reserves and Mineral Resources endnote #1.

3 See accompanying Mineral Reserves and Mineral Resources endnote #3.

4 See accompanying Mineral Reserves and Mineral Resources endnote #4.

5 See accompanying Mineral Reserves and Mineral Resources endnote #5.

6 Measured mineral resources are shown inclusive of proven mineral reserves.

7 Indicated mineral resources are shown inclusive of probable mineral reserves.

8 See accompanying Mineral Reserves and Mineral Resources endnote #6.

9 See accompanying Mineral Reserves and Mineral Resources endnote #9.

10 See accompanying Mineral Reserves and Mineral Resources endnote #10.

11 See accompanying Mineral Reserves and Mineral Resources endnote #17.

 

BARRICK YEAR-END 2019   123   RESERVES AND RESOURCES


COPPER MINERAL RESOURCES 1,2,3,4,5                                                                     
As at December 31, 2019    MEASURED (M) 6,7               INDICATED (I) 7,8            (M) + (I) 6,7,8            INFERRED 9  
     Tonnes      Grade      Contained
lbs
           Tonnes      Grade      Contained
lbs
              Contained
lbs
              Tonnes      Grade      Contained
lbs
 
                                                                                            
 Based on attributable pounds    (Mt)      (%)      (Mlb)            (Mt)      (%)      (Mlb)            (Mlb)            (Mt)      (%)      (Mlb)  

AFRICA AND MIDDLE EAST

                                   

Bulyanhulu underground (84.00%) 10

     3.1        0.54        37          9.8        0.44        94          130          13        0.6        170  

Lumwana surface (100%)

     81        0.53        940          850        0.65        12,000          13,000          9.6        0.5        120  

Jabal Sayid surface

     0.079        3.21        5.6                                 5.6                         

Jabal Sayid underground

     7.5        2.66        440          7.1        2.38        370          810          2.2        2.1        100  

Jabal Sayid (50.00%) total

     7.6        2.66        440          7.1        2.38        370          820          2.2        2.1        100  

AFRICA AND MIDDLE EAST TOTAL

     91        0.71        1,400          860        0.66        13,000          14,000          24        0.7        390  

NORTH AMERICA

                                   

Phoenix surface (61.50%)

     43        0.18        170          260        0.16        880          1,100          18        0.2        62  

NORTH AMERICA TOTAL

     43        0.18        170          260        0.16        880          1,100          18        0.2        62  

LATIN AMERICA AND ASIA PACIFIC

                                   

Zaldívar surface (50.00%)

     350        0.41        3,200          280        0.38        2,400          5,500          29        0.4        260  

Norte Abierto surface (50.00%)

     170        0.21        790          1000        0.21        4,700          5,500          360        0.2        1,400  

LATIN AMERICA AND ASIA PACIFIC TOTAL

     520        0.34        3,900          1,300        0.25        7,100          11,000          390        0.2        1,700  

    

                                                                                               

TOTAL

     660        0.38        5,500          2,400        0.38        21,000          26,000          430        0.2        2,200  

1 Mineral resources which are not mineral reserves do not have demonstrated economic viability.

2 See accompanying Mineral Reserves and Mineral Resources endnote #1.

3 See accompanying Mineral Reserves and Mineral Resources endnote #3.

4 See accompanying Mineral Reserves and Mineral Resources endnote #4.

5 See accompanying Mineral Reserves and Mineral Resources endnote #7.

6 Measured mineral resources are shown inclusive of proven mineral reserves.

7 See accompanying Mineral Reserves and Mineral Resources endnote #5.

8 Indicated mineral resources are shown inclusive of probable mineral reserves.

9 See accompanying Mineral Reserves and Mineral Resources endnote #6.

10 See accompanying Mineral Reserves and Mineral Resources endnote #10.

 

BARRICK YEAR-END 2019   124   RESERVES AND RESOURCES


SILVER MINERAL RESOURCES 1,2,3,4,5                                                                     
As at December 31, 2019    MEASURED (M) 6,7            INDICATED (I) 7,8            (M) + (I) 6,7,8            INFERRED 9  
     Tonnes      Ag
Grade
     Contained
Ag
              Tonnes      Ag
Grade
     Contained
ozs
              Contained
ozs
              Tonnes      Ag
Grade
     Contained
ozs
 
                                                                                            
 Based on attributable ounces    (Mt)      (g/t)      (Moz)            (Mt)      (g/t)      (Moz)            (Moz)            (Mt)      (g/t)      (Moz)  

AFRICA AND MIDDLE EAST

                                   

Bulyanhulu underground (84.00%) 10

     3.1        7.96        0.80          9.8        6.17        1.9          2.7          13        9.0        3.7  

AFRICA AND MIDDLE EAST TOTAL

     3.1        7.96        0.80          9.8        6.17        1.9          2.7          13        9.0        3.7  

NORTH AMERICA

                                   

Phoenix surface (61.50%)

     15        7.42        3.5          180        6.38        37          41          12        6.1        2.5  

NORTH AMERICA TOTAL

     15        7.42        3.5          180        6.38        37          41          12        6.1        2.5  

LATIN AMERICA AND ASIA PACIFIC

                                   

Pueblo Viejo surface (60.00%)

     80        16.16        42          120        11.17        45          86          33        10.6        11  

Norte Abierto surface (50.00%)

     190        1.62        10          1,100        1.23        43          53          370        1.0        11  

Pascua-Lama surface (100%)

     43        57.21        79          390        52.22        660          740          15        17.8        8.8  

Lagunas Norte surface (100%)

     1.4        2.69        0.12          57        5.40        9.9          10          1.4        3.5        0.16  

Veladero surface (50.00%)

     18        11.97        7.0          180        14.06        80          87          20        15.0        9.5  

LATIN AMERICA AND ASIA PACIFIC TOTAL

     330        12.78        140          1,800        14.19        840          970          440        2.9        41  

    

                                                                                               

TOTAL

     350        12.52        140          2,000        13.44        870          1,000          460        3.2        47  

1 Mineral resources which are not mineral reserves do not have demonstrated economic viability.

2 See accompanying Mineral Reserves and Mineral Resources endnote #1.

3 See accompanying Mineral Reserves and Mineral Resources endnote #3.

4 See accompanying Mineral Reserves and Mineral Resources endnote #4.

5 See accompanying Mineral Reserves and Mineral Resources endnote #7.

6 Measured mineral resources are shown inclusive of proven mineral reserves.

7 See accompanying Mineral Reserves and Mineral Resources endnote #5.

8 Indicated mineral resources are shown inclusive of probable mineral reserves.

9 See accompanying Mineral Reserves and Mineral Resources endnote #6.

10 See accompanying Mineral Reserves and Mineral Resources endnote #10.

 

BARRICK YEAR-END 2019   125   RESERVES AND RESOURCES


SUMMARY GOLD MINERAL RESERVES 1,2,3  
For the years ended December 31    2019      2018  
     Ownership   Tonnes      Grade      Ounces      Ownership     Tonnes      Grade      Ounces  
Based on attributable ounces    %   (Mt)      (g/t)      (Moz)      %     (Mt)      (g/t)      (Moz)  

AFRICA AND MIDDLE EAST

                     

Kibali surface 4

   45.00%     11        2.92        0.99             

Kibali underground 4

   45.00%     20        4.87        3.2             

Kibali Total 4

   45.00%     31        4.20        4.2             

Loulo-Gounkoto surface 4

   80.00%     18        3.28        1.9             

Loulo-Gounkoto underground 4

   80.00%     27        5.16        4.5             

Loulo-Gounkoto Total 4

   80.00%     45        4.41        6.4             

Tongon surface 4

   89.70%     8.9        2.14        0.61             

Massawa surface 4,5

   83.25%     17        3.94        2.2             

Bulyanhulu surface 6

   84.00%     1.1        1.19        0.041             

Bulyanhulu underground 6

   84.00%     6.4        10.70        2.2             

Bulyanhulu Total 6

   84.00%     7.5        9.34        2.2        63.90     6.6        8.2        1.7  

North Mara surface 6

   84.00%     15        1.49        0.73             

North Mara underground 6

   84.00%     5.8        5.40        1.0             

North Mara Total 6

   84.00%     21        2.57        1.7        63.90     17        2.59        1.4  

Buzwagi surface 6

   84.00%     5.1        0.84        0.14        63.90     6.8        0.90        0.20  

Jabal Sayid surface

   50.00%     13        0.24        0.097                                     

AFRICA AND MIDDLE EAST TOTAL

         150        3.69        18                                     

NORTH AMERICA

                     

Hemlo surface

   100%     1.6        1.28        0.066             

Hemlo underground

   100%     9.0        4.37        1.3             

Hemlo Total

   100%     11        3.90        1.3        100     24        2.48        1.9  

Golden Sunlight

                100     0.30        1.70         

Long Canyon surface Total 7

   61.50%     4.9        2.48        0.39             

Phoenix surface 7

   61.50%     100        0.59        2.0             

Carlin surface 8

   61.50%     100        2.15        7.1        100     63        2.99        6.1  

Carlin Underground 8

   61.50%     19        9.59        5.9        100     8.9        9.98        2.9  

Carlin Total 8

   61.50%     120        3.32        13.0        100     72        3.91        9.0  

Cortez surface 9

   61.50%     57        1.35        2.5             

Cortez Underground 9,10

   61.50%     11        9.91        3.6             

Cortez Total 9

   61.50%     69        2.77        6.1        100     150        1.87        11  

Turquoise Ridge surface 11

   61.50%     34        1.95        2.1             

Turquoise Ridge underground 11

   61.50%     18        10.90        6.2             

Turquoise Ridge Total 11

   61.50%     51        5.02        8.3        75     16        12.97        6.8  

NORTH AMERICA TOTAL

         360        2.68        31                                     

LATIN AMERICA AND ASIA PACIFIC

                     

Norte Abierto surface

   50.00%     600        0.60        12.0        50.00     600        0.60        12  

Pueblo Viejo surface

   60.00%     71        2.49        5.7        60.00     77        2.66        6.6  

Veladero surface

   50.00%     120        0.73        2.8        50.00     110        0.74        2.5  

Lagunas Norte

   100%                          100     45        2.74        4.0  

Porgera surface

   47.50%     8.5        3.63        0.99             

Porgera underground

   47.50%     6.6        6.33        1.3             

Porgera Total

   47.50%     15        4.81        2.3        47.50     13        4.93        2.1  

Kalgoorlie 12

                                    50.00     96        1.18        3.7  

LATIN AMERICA AND ASIA PACIFIC TOTAL

         810        0.87        22                                     

Other

                                            14        0.24        0.10  

TOTAL

         1,300        1.68        71                1,200        1.56        62  

1 See accompanying Mineral Reserves and Mineral Resources endnote #1.

2 See accompanying Mineral Reserves and Mineral Resources endnote #2.

3 See accompanying Mineral Reserves and Mineral Resources endnote #4.

4 See accompanying Mineral Reserve and Mineral Resource endnote #8.

5 See accompanying Mineral Reserve and Mineral Resource endnote #9.

6 See accompanying Mineral Reserve and Mineral Resource endnote #10.

 

BARRICK YEAR-END 2019   126   RESERVES AND RESOURCES


7 See accompanying Mineral Reserve and Mineral Resource endnote #11.

8 See accompanying Mineral Reserve and Mineral Resource endnote #12.

9 See accompanying Mineral Reserve and Mineral Resource endnote #13.

10 See accompanying Mineral Reserve and Mineral Resource endnote #17.

11 See accompanying Mineral Reserve and Mineral Resource endnote #14.

12 See accompanying Mineral Reserve and Mineral Resource endnote #16.

 

BARRICK YEAR-END 2019   127   RESERVES AND RESOURCES


Mineral Reserves and Resources Endnotes

 

  1.

Mineral reserves (“reserves”) and mineral resources (“resources”) have been estimated as at December 31, 2019 (unless otherwise noted) in accordance with National Instrument 43-101 as required by Canadian securities regulatory authorities. For United States reporting purposes, the SEC has adopted amendments to its disclosure rules to modernize the mineral property disclosure requirements for issuers whose securities are registered with the SEC under the Securities and Exchange Act of 1934, as amended (the “Exchange Act”). These amendments became effective February 25, 2019 (the “SEC Modernization Rules”) with compliance required for the first fiscal year beginning on or after January 1, 2021. The SEC Modernization Rules replace the historical property disclosure requirements for mining registrants that were included in SEC Industry Guide 7, which will be rescinded from and after the required compliance date of the SEC Modernization Rules. As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of “measured”, “indicated” and “inferred” mineral resources. In addition, the SEC has amended its definitions of “proven mineral reserves” and “probable mineral reserves” to be substantially similar to the corresponding Canadian Institute of Mining, Metallurgy and Petroleum definitions, as required by NI 43-101. U.S. investors should understand that “inferred” mineral resources have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. In addition, U.S. investors are cautioned not to assume that any part or all of Barrick’s mineral resources constitute or will be converted into reserves. Mineral resource and mineral reserve estimations have been prepared by employees of Barrick, its joint venture partners or its joint venture operating companies, as applicable, under the supervision of regional Mineral Resource Managers Simon Bottoms, Africa & Middle East Mineral Resource Manager and Chad Yuhasz, Latin America & Australia Pacific Mineral Resource Manager, Craig Fiddes, North America Resource Modeling Manager and reviewed by Rodney Quick Barrick Executive Mineral Resource Management and Evaluation. Except as noted below, reserves have been estimated based on an assumed gold price of US$1,200 per ounce, an assumed silver price of US$16.50 per ounce, and an assumed copper price of US$2.75 per pound and long-term average exchange rates of 1.30 CAD/US$. Reserve estimates incorporate current and/or expected mine plans and cost levels at each property. Varying cut-off grades have been used depending on the mine and type of ore contained in the reserves. Barrick’s normal data verification procedures have been employed in connection with the calculations. Verification procedures include industry-standard quality control practices. Resources as at December 31, 2019 have been estimated using varying cut-off grades, depending on both the type of mine or project, its maturity and ore types at each property.

 

  2.

In confirming our annual reserves for each of our mineral properties, projects, and operations, we conduct a reserve test on December 31 of each year to verify that the future undiscounted cash flow from reserves is positive. The cash flow ignores all sunk costs and only considers future operating and closure expenses as well as any future capital costs.

 

  3.

The Barrick 2018 mineral resources were reported on an exclusive basis and exclude all areas that form mineral reserves; the Barrick 2019 mineral resources are reported on an inclusive basis and include all areas that form mineral reserves, reported at a mineral resource cut-off and associated commodity price. As a result, the respective Barrick 2018 mineral resources are not directly comparable to that of the Barrick 2019 mineral resources.

 

  4.

All mineral resource and mineral reserve estimates of tonnes, Au oz, Ag oz and Cu lb are reported to the second significant digit.

 

  5.

All measured and indicated mineral resource estimates of grade and all proven and probable mineral reserve estimates of grade for Au g/t, Ag g/t and Cu % are reported to 2 decimal places.

 

  6.

All inferred mineral resource estimates of grade for Au g/t, Ag g/t and Cu % are reported to 1 decimal place.

 

  7.

2019 polymetallic mineral resources and mineral reserves are estimated using the combined value of gold, copper & silver and accordingly are reported as Gold, Copper & Silver mineral resources and mineral reserves.

 

  8.

These sites were acquired as a result of the Merger and therefore are not reported as of December 31, 2018.

 

  9.

On December 10, 2019, Barrick entered into an agreement to sell its interest in Massawa to Teranga Gold Corporation. The transaction is expected to close in the first quarter of 2020. For additional information, see page 40 of Barrick’s Fourth Quarter and Year End Report 2020.

 

  10.

Formerly known as Acacia Mining plc. On September 17, 2019, Barrick acquired all of the shares of Acacia it did not own, bringing its ownership of Bulyanhulu, North Mara and Buzwagi up from 63.9% to 100%. On January 24, 2020, Barrick announced the signing of an agreement with the GoT, through which, among other things, the GoT will acquire a 16% free-carried interest in these sites, expected to be made effective as of January 1, 2020. For convenience, Barrick is reporting these mineral reserves and resources at its resulting 84% ownership interest.

 

  11.

These sites were acquired as a result of the formation of Nevada Gold Mines on July 1, 2019.

 

  12.

On July 1, 2019, Barrick’s Goldstrike and Newmont’s Carlin were contributed to Nevada Gold Mines and are now referred to as Carlin. As a result, the amounts presented as of December 31, 2018 represent Goldstrike on a 100% basis (including our 60% share of South Arturo), and the amounts presented as of December 31, 2019 represent Carlin and Goldstrike (including our 60% share of South Arturo) on a 61.5% basis.

 

  13.

On July 1, 2019, Cortez was contributed to Nevada Gold Mines. As a result, Barrick now holds a 61.5% interest in Cortez. The amounts presented as of December 31, 2018 represent Cortez and Goldrush on a 100% basis, and the amounts presented as of December 31, 2019 represent Cortez and Goldrush on a 61.5% basis.

 

BARRICK YEAR-END 2019   128   RESERVES AND RESOURCES


  14.

On July 1, 2019, Barrick’s 75% interest in Turquoise Ridge and Newmont’s Twin Creeks and 25% interest in Turquoise Ridge were contributed to Nevada Gold Mines. As a result, the amounts presented as of December 31, 2018 are based on our 75% interest in Turquoise Ridge and the amounts presented as of December 31, 2019 represent our 61.5% share of Turquoise Ridge and Twin Creeks, now referred to as Turquoise Ridge.

 

  15.

Silver and copper probable reserve tonnage at the Bulyanhulu mine is less than the gold probable reserve tonnage because the gold reserve includes 1.3 million tonnes of tailings material which are being separately reprocessed for recovery of gold only.

 

  16.

On November 28, 2019, we completed the sale of our 50% interest in Kalgoorlie in Western Australia to Saracen Mineral Holdings Limited. For additional information, see page 40 of Barrick’s Fourth Quarter and Year End Report 2019.

 

  17.

Cortez underground includes 3.9 million tonnes at 9.69 g/t for 1.2 million ounces of probable reserves, 26.3 million tonnes at 7.80 g/t for 6.6 million ounces of indicated resources and 4.8 million tonnes at 7.60 g/t for 1.2 million ounces of inferred resources related to Goldrush. As noted in endnote #3, mineral resources are reported on an inclusive basis.

 

BARRICK YEAR-END 2019   129   RESERVES AND RESOURCES


Consolidated Statements of Income

(unaudited)

 

  Barrick Gold Corporation             
  For the years ended December 31 (in millions of United States dollars, except per share data)    2019     2018  

  Revenue

     $9,717       $7,243  

  Costs and expenses

    

  Cost of sales

     6,911       5,220  

  General and administrative expenses

     212       265  

  Exploration, evaluation and project expenses

     342       383  

  Impairment (reversals) charges

     (1,423     900  

  Loss on currency translation

     109       136  

  Closed mine rehabilitation

     5       (13

  Income from equity investees

     (165     (46

  Other (income) expense

     (3,100     90  

  Income before finance items and income taxes

     6,826       308  

  Finance costs, net

     (469     (545

  Income (loss) before income taxes

     6,357       (237

  Income tax expense

     (1,783     (1,198

  Net income (loss)

     $4,574       ($1,435

  Attributable to:

    

  Equity holders of Barrick Gold Corporation

     $3,969       ($1,545

  Non-controlling interests

     $605       $110  

  Earnings (loss) per share data attributable to the equity holders of Barrick Gold Corporation

    

  Net income (loss)

    

Basic

     $2.26       ($1.32

Diluted

     $2.26       ($1.32


Consolidated Statements of Comprehensive Income

(unaudited)

 

  Barrick Gold Corporation             
  For the years ended December 31 (in millions of United States dollars)    2019     2018  

  Net income (loss)

   $ 4,574     ($ 1,435

  Other comprehensive income (loss), net of taxes

    

  Items that may be reclassified subsequently to profit or loss:

    

Unrealized gains (losses) on derivatives designated as cash flow hedges, net of tax $nil and ($12)

           8  

Realized (gains) losses on derivatives designated as cash flow hedges, net of tax $nil and $3

           (2

Currency translation adjustments, net of tax $nil and $nil

     (6     (9

  Items that will not be reclassified to profit or loss:

    

Actuarial gain (loss) on post-employment benefit obligations, net of tax ($3) and $nil

     (6     (2

Net change on equity investments, net of tax $nil and $nil

     48       16  

  Total other comprehensive income

     36       11  

  Total comprehensive income (loss)

   $ 4,610     ($ 1,424

  Attributable to:

    

  Equity holders of Barrick Gold Corporation

   $ 4,005     ($ 1,534

  Non-controlling interests

     $605       $110  


Consolidated Statements of Cash Flow

(unaudited)

  Barrick Gold Corporation

 

  For the years ended December 31 (in millions of United States dollars)    2019     2018  

 

  OPERATING ACTIVITIES

    

  Net income (loss)

     $4,574       ($1,435

  Adjustments for the following items:

    

Depreciation

     2,032       1,457  

Finance costs

     500       560  

Impairment (reversals) charges

     (1,423     900  

Income tax expense

     1,783       1,198  

Loss on currency translation

     109       136  

Gain on sale of non-current assets

     (441     (68

Remeasurement of Turquoise Ridge to fair value

     (1,886      

  Change in working capital

     (357     (173

  Other operating activities

 

     (1,070     (62

 

  Operating cash flows before interest and income taxes

 

     3,821       2,513  

  Interest paid

     (333     (350

  Income taxes paid

     (655     (398

 

  Net cash provided by operating activities

 

     2,833       1,765  

 

  INVESTING ACTIVITIES

    

  Property, plant and equipment

    

Capital expenditures

     (1,701     (1,400

Sales proceeds

     41       70  

  Divestitures

     750        

  Investment purchases

     (4     (159

  Cash acquired in merger

     751        

  Other investing activities

 

     213       (5

 

  Net cash provided by (used in) investing activities

 

     50       (1,494

 

  FINANCING ACTIVITIES

    

  Lease repayments

     (28      

  Debt repayments

     (281     (687

  Dividends

     (548     (125

  Funding from non-controlling interests

     140       24  

  Disbursements to non-controlling interests

     (421     (108

  Other financing activities

 

     (1     (29

 

  Net cash used in financing activities

 

     (1,139     (925

 

  Effect of exchange rate changes on cash and equivalents

 

     (1     (9

  Net increase (decrease) in cash and equivalents

     1,743       (663

  Cash and equivalents at beginning of year

 

     1,571       2,234  

 

  Cash and equivalents at the end of year

 

     $3,314       $1,571  


Consolidated Balance Sheets

(unaudited)

 

  Barrick Gold Corporation

 

  (in millions of United States dollars)

   As at December
31, 2019
    As at
December 31,
2018
 

 

ASSETS

    

Current assets

    

Cash and equivalents

     $3,314       $1,571  

Accounts receivable

     363       248  

Inventories

     2,289       1,852  

Other current assets

     565       307  

 

Total current assets (excluding assets classified as held-for-sale)

     6,531       3,978  

Assets classified as held-for-sale

     356        

 

Total current assets

     6,887       3,978  

Non-current assets

    

Non-current portion of inventory

     2,300       1,696  

Equity in investees

     4,527       1,234  

Property, plant and equipment

     24,141       12,826  

Intangible assets

     226       227  

Goodwill

     4,769       1,176  

Deferred income tax assets

     235       259  

Other assets

     1,307       1,235  

 

Total assets

     $44,392       $22,631  

 

LIABILITIES AND EQUITY

    

Current liabilities

    

Accounts payable

     $1,190       $1,101  

Debt

     375       43  

Current income tax liabilities

     92       203  

Other current liabilities

     622       321  

 

Total current liabilities (excluding liabilities classified as held-for-sale)

     2,279       1,668  

Liabilities classified as held-for-sale

            

 

Total current liabilities

     2,279       1,668  

Non-current liabilities

    

Debt

     5,161       5,695  

Provisions

     3,114       2,904  

Deferred income tax liabilities

     3,091       1,236  

Other liabilities

     920       1,743  

 

Total liabilities

     14,565       13,246  

Equity

    

Capital stock

     29,231       20,883  

Deficit

     (9,722     (13,453

Accumulated other comprehensive loss

     (122     (158

Other

     2,045       321  

 

Total equity attributable to Barrick Gold Corporation shareholders

     21,432       7,593  

Non-controlling interests

     8,395       1,792  

 

Total equity

     29,827       9,385  

Contingencies and commitments

                

 

Total liabilities and equity

     $44,392       $22,631  


Consolidated Statements of Changes in Equity

(Unaudited)

 

Barrick Gold Corporation            Attributable to equity holders of the Company                
(in millions of United States dollars)    Common
Shares (in
thousands)
     Capital
stock
    Retained
earnings
(deficit)
    Accumulated
other
comprehensive
income (loss)1
    Other2      Total equity
attributable to
shareholders
    Non-
controlling
interests
    Total equity  

At January 1, 2019

     1,167,847        $20,883       ($13,453     ($158     $321        $7,593       $1,792       $9,385  

Net income (loss)

                  3,969                    3,969       605       4,574  

Total other comprehensive income

                        36              36             36  

Total comprehensive income (loss)

            $—       $3,969       $36       $—        $4,005       $605       $4,610  

Transactions with owners

                  

Dividends

                  (218                  (218           (218

Merger with Randgold Resources Limited

     583,669        7,903                          7,903       872       8,775  

Nevada Gold Mines JV with Newmont Goldcorp Corporation

                              1,645        1,645       5,910       7,555  

Acquisition of 36.1% of Acacia Mining plc

     24,837        423                   70        493       (495     (2

Issued on exercise of stock options

     131        2                          2             2  

Funding from non-controlling interests

                                           140       140  

Other decrease in non-controlling interests

                                           (429     (429

Dividend reinvestment plan

     1,443        20       (20                               

Share-based payments

                              9        9             9  

Total transactions with owners

     610,080        $8,348       ($238     $—       $1,724        $9,834       $5,998       $15,832  

At December 31, 2019

     1,777,927        $29,231       ($9,722     ($122     $2,045        $21,432       $8,395       $29,827  
                                                                    

At December 31, 2017

     1,166,577        $20,893       ($11,759     ($169     $321        $9,286       $1,781       $11,067  

Impact of adopting IFRS 15 on January 1, 2018

                  64                    64             64  

At January 1, 2018 (restated)

     1,166,577        $20,893       ($11,695     ($169     $321        $9,350       $1,781       $11,131  

Net (loss) income

                  (1,545                  (1,545     110       (1,435

Total other comprehensive income

                        11              11             11  

Total comprehensive (loss) income

            $—       ($1,545     $11       $—        ($1,534     $110       ($1,424

Transactions with owners

                  

Dividends

                  (199                  (199           (199

Issued on exercise of stock options

     20                                              

Funding from non-controlling interests

                                           24       24  

Other decrease in non-controlling interests

                                           (123     (123

Dividend reinvestment plan

     1,250        14       (14                               

Other3

            (24                        (24           (24

Total transactions with owners

     1,270        ($10     ($213     $—       $—        ($223     ($99     ($322

At December 31, 2018

     1,167,847        $20,883       ($13,453     ($158     $321        $7,593       $1,792       $9,385  
                                                                    

 

1 

Includes cumulative translation adjustments as at December 31, 2019: $88 million loss (December 31, 2018: $82 million loss).

 

2 

Includes additional paid-in capital as at December 31, 2019: $2,007 million (December 31, 2018: $283 million).

 

3 

Represents a reversal of a previously recognized deferred tax asset, which was originally recognized in capital stock.


Corporate Office

Barrick Gold Corporation

161 Bay Street, Suite 3700

Toronto, Ontario M5J 2S1

Canada

Telephone: +1 416 861-9911

Email: investor@barrick.com

Website: www.barrick.com

Shares Listed

 

GOLD

The New York Stock Exchange

ABX

The Toronto Stock Exchange

Transfer Agents and Registrars

AST Trust Company (Canada)

P.O. Box 700, Postal Station B

Montreal, Quebec H3B 3K3

or

American Stock Transfer & Trust Company, LLC

6201 – 15 Avenue

Brooklyn, New York 11219

Telephone: 1-800-387-0825

Fax: 1-888-249-6189

Email: inquiries@astfinancial.com

Website: www.astfinancial.com

Enquiries

President and Chief Executive Officer

Mark Bristow

+1 647 205 7694

+44 788 071 1386

Senior Executive Vice-President and

Chief Financial Officer

Graham Shuttleworth

+1 647 262 2095

+44 779 771 1338

+44 1534 735 333

Investor and Media Relations

Kathy du Plessis

+44 20 7557 7738

barrick@dpapr.com

 


Cautionary Statement on Forward-Looking Information

 

Barrick cautions that, whether or not expressly stated, all full year and fourth quarter figures contained in this press release reflect our expected full year and fourth quarter results as of the date of this press release. Actual audited full year and fourth quarter results are subject to management’s final review, as well as review by the Company’s independent accounting firm, and may vary significantly from those expectations because of a number of factors, including, without limitation, additional or revised information, and changes in accounting standards or policies, or in how those standards are applied. For a complete picture of the Company’s financial performance, it will be necessary to review all of the information in the Company’s full year and fourth quarter financial report and related MD&A as filed on SEDAR at www.sedar.com and on EDGAR at www.sec.gov. Accordingly, readers are cautioned not to rely solely on the information contained herein.

Certain information contained or incorporated by reference in this press release, including any information as to our strategy, projects, plans or future financial or operating performance, constitutes “forward-looking statements”. All statements, other than statements of historical fact, are forward-looking statements. The words “believe”, “expect”, “anticipate”, “target”, “plan”, “objective”, “assume”, “intend”, “intention”, “project”, “goal”, “continue”, “budget”, “estimate”, “potential”, “may”, “will”, “can”, “could”, “would” and similar expressions identify forward-looking statements. In particular, this press release contains forward-looking statements including, without limitation, with respect to: Barrick’s goal to be the world’s most valued gold mining business; our strategies and plans with respect to environmental, sustainability and governance issues; mine life and production rates; potential mineralization and metal or mineral recoveries; expected replacement of mineral reserves and resources; our future plans, growth potential, financial strength, investments and overall strategy; our plans and expected completion and benefits of our projects, including automation initiatives, Pueblo Viejo plant expansion, projects at Loulo Gounkoto (including the development of the complex’s third underground mine, exploration program, solar power project and the Ramjack Newtrax automation and monitoring project) and the grid stabilizer project at Kibali; progress with respect to the settlement of tax disputes with the Malian government and our future working relationship as long-term partners; future investments in community projects and contributions to local economies; and long-term value creation for the stakeholders of Barrick’s Tanzanian operations.

Forward-looking statements are necessarily based upon a number of estimates and assumptions including material estimates and assumptions related to the factors set forth below that, while considered reasonable by the Company as at the date of this press release in light of management’s experience and perception of current conditions and expected developments, are inherently subject to significant business, economic and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking statements and undue reliance should not be placed on such statements and information. Such factors include, but are not limited to: fluctuations in the spot and forward price of gold,

copper or certain other commodities (such as silver, diesel fuel, natural gas and electricity); the speculative nature of mineral exploration and development; changes in mineral production performance, exploitation and exploration successes; risks associated with projects in the early stages of evaluation and for which additional engineering and other analysis is required ; the Company’s ability to successfully re-integrateAcacia’s operations; whether benefits expected from recent transactions are realized; disruption of supply routes which may cause delays in construction and mining activities at Barrick’s more remote properties; diminishing quantities or grades of reserves; increased costs, delays, suspensions and technical challenges associated with the construction of capital projects; operating or technical difficulties in connection with mining or development activities, including geotechnical challenges and disruptions in the maintenance or provision of required infrastructure and information technology systems; failure to comply with environmental and

health and safety laws and regulations; timing of receipt of, or failure to comply with, necessary permits and approvals; uncertainty whether some or targeted investments and projects will meet the Company’s capital allocation objectives and internal hurdle rate; the impact of global liquidity and credit availability on the timing of cash flows and the values of assets and liabilities based on projected future cash flows; adverse changes in our credit ratings; the impact of inflation; fluctuations in the currency markets; changes in U.S. dollar interest rates; risks arising from holding derivative instruments; changes in national and local government legislation, taxation, controls or regulations and/or changes in the administration of laws, policies and practices; expropriation or nationalization of property and political or economic developments in Canada, the United States and other jurisdictions in which the Company or its affiliates do or may carry on business in the future; lack of certainty with respect to foreign legal systems, corruption and other factors that are inconsistent with the rule of law; risks associated with illegal and artisanal mining; the risks of operating in jurisdictions where infectious diseases present major health care issues; damage to the Company’s reputation due to the actual or perceived occurrence of any number of events, including negative publicity with respect to the Company’s handling of environmental matters or dealings with community groups, whether true or not; the possibility that future exploration results will not be consistent with the Company’s expectations; risks that exploration data may be incomplete and considerable additional work may be required to complete further evaluation, including but not limited to drilling, engineering and socioeconomic studies and investment; risk of loss due to acts of war, terrorism, sabotage and civil disturbances; litigation; contests over title to properties, particularly title to undeveloped properties, or over access to water, power and other required infrastructure; business opportunities that may be presented to, or pursued by, the Company; risks associated with the fact that certain of the initiatives described in this press release are still in the early stages and may not materialize; our ability to successfully integrate acquisitions or complete divestitures; risks associated with working with partners in jointly controlled assets; employee relations including loss of key employees; increased costs and physical risks, including extreme weather events and resource shortages, related to climate change;

 


and availability and increased costs associated with mining inputs and labor. In addition, there are risks and hazards associated with the business of mineral exploration, development and mining, including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins, flooding and gold bullion, copper cathode or gold or copper concentrate losses (and the risk of inadequate insurance, or inability to obtain insurance, to cover these risks).

Many of these uncertainties and contingencies can affect our actual results and could cause actual results to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf of, us. Readers are cautioned that forward-looking statements are not guarantees of future performance. All of the forward-looking statements made in this press release are qualified by these cautionary statements. Specific reference is made to the most recent Form 40-F/Annual Information Form on file with the SEC and Canadian provincial securities regulatory authorities for a more detailed discussion of some of the factors underlying forward-looking statements and the risks that may affect Barrick’s ability to achieve the expectations set forth in the forward-looking statements contained in this press release. We disclaim any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by applicable law.