NOTE 6 – REGULATORY MATTERS

UNITIL’S REGULATORY MATTERS ARE DESCRIBED IN NOTE 8 TO THE FINANCIAL STATEMENTS IN ITEM 8 OF PART II OF UNITIL CORPORATION’S FORM 10-K FOR DECEMBER 31, 2017 AS FILED WITH THE SECURITIES AND EXCHANGE COMMISSION ON FEBRUARY 1, 2018.

 

Tax Cuts and Jobs Act of 2017

On December 22, 2017, the Tax Cuts and Jobs Act of 2017 (TCJA) was signed into law. Among other things, the TCJA substantially reduced the corporate income tax rate to 21 percent, effective January 1, 2018. Each state public utility commission, with jurisdiction over the areas that are served by Unitil’s electric and gas subsidiary companies, has issued procedural orders directing how the tax law changes are to be reflected in rates, including requiring that the companies provide certain filings and calculations. Unitil has complied with these orders and has made the required changes to its rates as directed by the commissions. The FERC has also opened a rulemaking proceeding on this matter which has been addressed in a rate settlement filing by Granite State (described below). The Company believes that these matters are substantially resolved and will not have a material impact on its financial position, operating results, or cash flows.

In Maine, Northern Utilities’ Maine division recently completed a base rate case (described below). The MPUC’s final order in that docket incorporated the lower tax rates in the calculation of rates for the Company.

Similarly, in New Hampshire, Northern Utilities’ New Hampshire division recently completed a base rate case proceeding (described below). The NHPUC’s final order in that docket approved a comprehensive settlement agreement among the Company, the Staff of the Public Utilities Commission and the Office of Consumer Advocate which included the effect of the tax changes in the calculation of the revenue requirement. With respect to Unitil Energy, on April 30, 2018 the NHPUC approved the Company’s annual step increase pursuant to the provisions of its last base rate case, which included adjustments to account for the TCJA’s income tax changes.

In Massachusetts, the MDPU issued an order opening an investigation into the effect on rates of the decrease in the federal corporate income tax rate on the MDPU’s regulated utilities, and required each utility subject to its jurisdiction to submit proposals to address the effects of the TCJA and to reduce its rates as of January 1, 2018. The MDPU consolidated an earlier petition filed by the Attorney General requesting such an investigation into its order. On June 29, 2018, the MDPU issued an order accepting Fitchburg’s proposal to decrease the annual revenue requirement of both its gas and electric divisions by $0.8 million each. The MDPU will address the refund of excess accumulated deferred income taxes in phase two of its investigation. An order is pending.

On May 2, 2018, Granite State filed an uncontested rate settlement with FERC which accounted for the effects of the TCJA in its rates. The settlement was approved by FERC on June 27, 2018, and complies with and satisfies the FERC Notice of Proposed Rulemaking concerning the justness and reasonableness of rates in light of the corporate income tax reduction under the TCJA.

Base Rate Activity

Unitil Energy – Base Rates – On April 20, 2017 the NHPUC approved a permanent increase of $4.1 million in electric base rates, and a three year rate plan with an additional rate step adjustment, effective May 1, 2017, of $0.9 million, followed by two rate step adjustments in May of 2018 and 2019 to recover the revenue requirements associated with annual capital expenditures. On April 30, 2018, the NHPUC approved Unitil Energy’s second step adjustment filing. The filing incorporated the revenue requirement of $3.3 million for 2017 plant additions, a reduction of $2.2 million for the effect of the federal tax decrease pursuant to the TCJA, along with the termination of the one-year $1.4 million reconciliation adjustment which had recouped the difference between temporary rates and final rates. The net effect of the three adjustments resulted in a revenue decrease of $0.3 million.

Fitchburg – Base Rates – Electric – Fitchburg’s last base rate order from the MDPU, issued in April 2016, included the approval of an annual capital cost recovery mechanism to recover the revenue requirement associated with certain capital additions. While a number of the capital cost recovery filings may remain pending from year-to-year in any given year, the Company considers these to be routine regulatory proceedings and there are no material issues outstanding. On June 28, 2018, Fitchburg filed its compliance report of capital investments for calendar year 2017. This matter remains pending.

 

Fitchburg – Electric Grid Modernization – On May 10, 2018, the MDPU issued an order approving a three year grid modernization investment plan for Fitchburg for the period 2018 through 2020 with a spending cap of $4.4 million. The order provides for a cost recovery mechanism for incremental capital investments and operation and maintenance (O&M) expenses. The electric distribution companies in Massachusetts jointly filed compliance filings in August 2018 including 1) revised proposed performance metrics designed to address pre-authorized grid-facing investments, 2) a proposed evaluation plan for the three-year investment term, and 3) a model tariff for cost recovery including proposed protocol for identifying and tracking incremental O&M expenses. Approval of these filings is pending. The next three year investment plan is due July 1, 2020 for the period 2021 through 2023, and is required to include a five year strategic plan for 2021 – 2025.

Fitchburg – Solar Generation – On November 9, 2016, the MDPU approved Fitchburg’s petition to develop a 1.3 MW solar generation facility located on Company property in Fitchburg Massachusetts. Construction of the solar generating facility was completed and the facility began generating power on November 22, 2017. On April 2, 2018, Fitchburg submitted its first filing pursuant to its Solar Cost Adjustment tariff, by which the Company recovers its annual revenue requirement related to its investment in the solar generation facility. The filing sought a net amount of approximately $0.3 million for recovery effective June 1, 2018. The recovery of this amount in rates was approved by the MDPU on May 31, 2018, subject to further investigation and reconciliation. A final order is pending.

Fitchburg – Base Rates – Gas – Pursuant to the Company’s revenue decoupling adjustment clause tariff, as approved in its last base rate case, the Company is allowed to modify, on a semi-annual basis, its base distribution rates to an established revenue per customer target in order to mitigate economic, weather and energy efficiency impacts to the Company’s revenues. The MDPU has consistently found that the Company’s filings are in accord with its approved tariffs, applicable law and precedent, and that they result in just and reasonable rates.

Fitchburg – Gas System Enhancement Program – Pursuant to statute and MDPU order, Fitchburg has an approved Gas System Enhancement Plan (GSEP) tariff through which it may recover certain gas infrastructure replacement and safety related investment costs, subject to an annual cap. Under the plan, the Company is required to make two annual filings with the MDPU: a forward-looking filing for the subsequent construction year, to be filed on or before October 31; and a filing, submitted on or before May 1, of final project documentation for projects completed during the prior year, demonstrating substantial compliance with its plan in effect for that year and showing that project costs were reasonably and prudently incurred. While a number of the filings under the GSEP tariff may remain pending from year-to-year in any given year, the Company considers these to be routine regulatory proceedings and there are no material issues outstanding. Under this tariff, a revenue increase of $0.9 million went into effect on May 1, 2018, subject to the annual cap and reconciliation.

Northern Utilities – Base Rates – Maine – On February 28, 2018, the MPUC issued its Final Order (Order) in Northern Utilities pending base rate case. The Order provided for an annual revenue increase of $2.1 million before a reduction of $2.2 million to incorporate the effect of the lower federal income tax rate under the TCJA. The MPUC Order approved a return on equity of 9.5 percent and a capital structure reflecting 50 percent equity and 50 percent long-term debt. The Order also provides for a reduction in annual depreciation expense, reducing the Company’s annual operating costs by approximately $0.5 million, and addressed a number of other issues, including a change to therm billing, increases in other delivery charges, and cost recovery under the Company’s TAB Program and TIRA mechanism. The new rates and other changes became effective on March 1, 2018.

Northern Utilities – Targeted Infrastructure Replacement Adjustment – Maine – The settlement in Northern Utilities’ Maine division’s 2013 rate case allowed the Company to implement a TIRA rate mechanism to adjust base distribution rates annually to recover the revenue requirements associated with targeted investments in gas distribution system infrastructure replacement and upgrade projects, including the Company’s Cast Iron Replacement Program (CIRP). The TIRA had an initial term of four years and covered targeted capital expenditures in 2013 through 2016. In its Order in the current base rate case (see above), the MPUC approved an extension of the TIRA mechanism, with adjustment, for an additional eight-year period, which will allow for annual rate adjustments through the end of the CIRP program. On May 7, 2018, the MPUC approved the Company’s request to increase its annual base rates by 2.4%, or $1.1 million, to recover the revenue requirements for 2017 eligible facilities.

Northern Utilities – Targeted Area Build-out Program – Maine – In December 2015, the MPUC approved a Targeted Area Build-out (TAB) program and associated rate surcharge mechanism. This program is designed to allow the economic extension of natural gas mains to new, targeted service areas in Maine. It allows customers in the targeted area the ability to pay a rate surcharge, instead of a large upfront payment or capital contribution to connect to the natural gas delivery system. The initial pilot of the TAB program was approved for the City of Saco, and is being built out over a period of three years, with the potential to add 1,000 new customers and approximately $1 million in annual distribution revenue in the Saco area. A second TAB program was approved for the Town of Sanford, and has the potential to add 2,000 new customers and approximately $2 million in annual distribution revenue in the Sanford area. In its base rate case Order (described above), the MPUC approved the inclusion of Saco TAB investments in rate base along with a cost recovery incentive mechanism for future TAB investments.

Northern Utilities – Base Rates – New Hampshire – On May 2, 2018, the NHPUC approved a settlement agreement providing for an annual revenue increase of $2.6 million, a reduction of annual revenue of $1.7 million to reflect the effect of the TCJA, and a step increase of $2.3 million to recover post-test year capital investments, all effective May 1, 2018 (with the revenue increase of $2.6 million reconciling to the date of temporary rates of August 1, 2017 and the revenue decrease for TCJA reconciling to January 1, 2018), for a net increase of approximately $3.2 million. Under the agreement, the Company may file for a second step increase for effect May 1, 2019 to recover eligible capital investments in 2018, up to a revenue requirement cap of $2.2 million. If the Company chooses the option to implement the second step increase, the next distribution base rate case will be based on an historic test year of no earlier than twelve months ending December 31, 2020.

Northern Utilities – Franchise Extensions – New Hampshire – On October 3, 2018, the NHPUC granted Northern Utilities authority to expand its previously limited franchise to provide natural gas service in the Towns of Kingston and Atkinson, New Hampshire to serve new industrial, commercial and residential customers. Northern Utilities has also petitioned the NHPUC to extend its franchise into the Town of Epping, New Hampshire, where new commercial and residential developments present the Company with opportunities for growth. The franchise petition for service to the Town of Epping remains pending.

Granite State – Base Rates – On May 2, 2018, Granite State filed an uncontested rate settlement with FERC which provided for no change in rates, and accounted for the effects of a capital step adjustment offset by the effect of the TCJA. The settlement was approved by FERC on June 27, 2018, and complies with the FERC Notice of Proposed Rulemaking concerning the justness and reasonableness of rates in light of the corporate income tax reductions under the TCJA. The settlement also provides that Granite State may not file a general (Section 4) rate case prior to April 30, 2019.

Other Matters

NHPUC Energy Efficiency Resource Standard Proceeding – On August 2, 2016, the NHPUC issued an order establishing an Energy Efficiency Resource Standard (EERS), an energy efficiency policy with specific targets or goals for energy savings that New Hampshire electric and gas utilities must meet. The EERS includes a recovery mechanism to compensate the utilities for lost-revenue related to the EERS programs, and performance incentives and processes for stakeholder involvement, evaluation, measurement and verification, and oversight of the EERS programs. In accordance with the Order, on September 1, 2017, the New Hampshire electric and gas utilities jointly filed a Statewide Energy Efficiency Plan for the period 2018-2020, which was approved on January 2, 2018. On September 14, 2018, the New Hampshire electric and gas utilities jointly filed its 2019 update to the Statewide Energy Efficiency Plan. This filing is currently under review by the NHPUC.

 

Unitil Energy – Electric Grid Modernization – In July 2015, the NHPUC opened an investigation into Grid Modernization to address a variety of issues related to Distribution System Planning, Customer Engagement with Distributed Energy Resources, and Utility Cost Recovery and Financial Incentives. The NHPUC engaged a consultant to direct a Working Group to investigate these issues and to prepare a final report with recommendations for the Commission. The final report was filed on March 20, 2017. This matter remains pending.

Unitil Energy – Net Metering – Pursuant to legislation that became effective in May 2016, the NHPUC opened a proceeding to consider alternatives to the net metering tariffs currently in place. The NHPUC issued an Order on June 23, 2017. The Order removes the cap on the total amount of generation capacity which may be owned or operated by customer-generators eligible for net metering. The order also adopts an alternative net metering tariff for small customer-generators (those with renewable energy systems of 100 kW or less) which will remain in effect for a period of years while further data is collected and analyzed, time-of-use and other pilot programs are implemented, and a distributed energy resource valuation study is conducted. Systems that are installed or queued during this period will have their net metering rate structure “grandfathered” until December 31, 2040. The Company does not believe that this proceeding will have a material adverse impact on the Company’s financial position, operating results or cash flows.

Unitil Energy – Recent Legislation – On September 13, 2018, the New Hampshire legislature voted to override New Hampshire Governor Sununu’s veto of Senate Bill 365. The enacted legislation requires Unitil Energy to enter into a power purchase agreement with a trash incinerator located in its service territory to purchase the facility’s entire net electrical output for a period that is coterminous with Unitil Energy’s next six default service procurements. The procurement is to be priced at the adjusted energy rate derived from the default service rates approved by the NHPUC in each applicable default service supply solicitation proceeding. The anticipated higher cost differential of the power purchase agreement is to be recovered through a non-by-passable charge applicable to all customers.

Fitchburg – Electric Reconciliation Filing – The MDPU investigates and reviews Fitchburg’s annual filings which reconcile the costs and revenues in the Company’s various reconciliation accounts. Typically, the Reconciliation Filings are submitted during the fourth quarter for rates effective January 1 of the following year, and the MDPU approves them subject to reconciliation and pending further investigation. Subsequently, during the course of the year, the MDPU engages in more intensive review of these filings, including discovery and, when deemed necessary, the scheduling of evidentiary hearings. While a number of the Reconciling Filings may remain pending from year-to-year in any given year, the Company considers these to be routine regulatory proceedings and there are no material issues outstanding.

Fitchburg – Service Quality – On March 1, 2018, Fitchburg submitted its 2017 Service Quality Reports for both its gas and electric divisions in accordance with new Service Quality Guidelines issued by the MDPU in December 2015. Fitchburg reported that it met or exceeded its benchmarks for service quality performance in all metrics for both its gas and electric divisions. The MDPU approved the gas division’s filing on October 22, 2018. The electric division’s filing is pending approval.

Fitchburg – Energy Diversity – MassachusettsGovernor Baker signed into law H.4568 “An Act to Promote Energy Diversity” on August 8, 2016. Among many sections in the bill, the primary provision adds new sections 83c and 83d to the 2008 Green Communities Act. Section 83c requires every electric distribution company (EDC), including Fitchburg, to jointly and competitively solicit proposals for at least 400 MW’s of offshore wind energy generation by June 30, 2017, as part of a total of 1,600 MW of offshore wind the EDCs are directed to procure by June 30, 2027. The procurement requirement is subject to a determination by the MDPU that the proposed long-term contracts are cost-effective. Section 83d further requires the EDCs to jointly seek proposals for cost effective clean energy (hydro and other) long-term contracts via one or more staggered solicitations, the first of which shall be issued not later than April 1, 2017, for a total of 9,450,000 megawatt-hours by December 31, 2022. Emergency regulations implementing these new provisions, 220 C.M.R. § 23.00 et seq. and 220 C.M.R. § 24.00 et seq. were adopted by the MDPU on December 29, 2016, and adopted as final regulations on March 8, 2017. The EDCs issued the RFP for Long-Term Contracts for Clean Energy Projects, pursuant to Section 83d on March 31, 2017 and project proposals were received on July 27, 2017. Final selection of projects concluded in the first quarter of 2018, contracts were signed in June 2018 and on July 23, 2018, the EDCs, including Fitchburg, filed the 83d long-term contracts with MDPU for approval. This matter remains pending. The EDCs issued the RFP for Long-Term Contracts for Offshore Wind Energy Projects pursuant to Section 83c on June 29, 2017 and project proposals were received on December 20, 2017. Final selection of projects was made in late May 2018, contracts were signed in July 2018 and on July 23, 2018, the EDCs, including Fitchburg, filed the 83c long-term contracts with MDPU for approval. This matter remains pending.

Fitchburg – Recent Legislation – On August 9, 2018, Massachusetts Governor Baker signed into law H. 4857, “An Act to Advance Clean Energy.” The legislation contains numerous provisions, including: a requirement that increases the pace at which the Class 1 Renewable Portfolio Standard requirement increases, from the current pace of an additional 1 percent of sales each year to an additional 2 percent of sales each year during the period from January 1, 2020 through December 31, 2029; Electric supply contracts entered into after December 1, 2018 are required to provide a minimum percentage of kWh sales with clean peak resources, subject to regulations to be promulgated by the MDPU; Authorizes electric distribution companies to implement demand charges as part of a monthly minimum reliability charge provided the demand charge is based on system peak demand during the peak hours of the day and if affected customers are informed of the manner by which the demand charges are assessed and ways by which customers may manage and reduce demand; requires all gas distribution companies to report to the MDPU, in a uniform manner, lost and unaccounted for gas each year; Requires electric distribution companies to annually file with the MDPU an Electric Distribution System Resiliency Report which must include heat maps that show the electric load on the distribution system including loads during peak times, highlight the most congested or constrained areas of the distribution system and identify areas of the system most vulnerable to outages due to high electricity demand, lack of local generation, and extreme weather events; Establishes an energy storage target of 1,000 megawatt (MW) hours to be achieved by December 31, 2025, and requires each electric distribution company to submit a report to the Massachusetts Department of Energy Resources (DOER) documenting the energy storage installation in their service territory; Requires the DOER to investigate the necessity of requiring electric distribution companies to jointly conduct additional offshore wind generation solicitations and procurement of up to 1,600 MW of capacity in addition to the 1,600 MW required in H.4568 “An Act to Promote Energy Diversity”. Many of these provisions require further development and implementation by the MDPU and DOER. Fitchburg intends to actively participate in all such proceedings and will comply with all regulatory directives and requirements resulting from these legislative changes.

Fitchburg – Clean Energy RFP – Pursuant to Section 83a of the Green Communities Act in Massachusetts and similar clean energy directives established in Connecticut and Rhode Island, state agencies and the electric distribution companies in the three states, including Fitchburg, issued an RFP for clean energy resources (including Class I renewable generation and large hydroelectric generation) in November 2015. The RFP sought proposals for clean energy and transmission projects that can deliver new renewable energy to the three states. Project proposals were received in January 2016. Selection of contracts concluded during the fourth quarter of 2016 and contract negotiations concluded during the second quarter of 2017. On September 20, 2017, Fitchburg, along with the other three EDCs, filed for approval of the purchase power agreements which were negotiated as a result of the joint solicitation. A hearing on the merits was held in February 2018. The MDPU approved the agreements on June 15, 2018.

Fitchburg – Other – On August 25, 2017, the Massachusetts Department of Energy Resources (DOER) issued its final Solar Massachusetts Renewable Target (SMART) Program regulations. These regulations were promulgated pursuant to Chapter 75 of the Acts of 2016, which required the DOER to establish a new solar incentive program. The regulation is designed to support the continued development of an additional 1,600 MW of solar renewable energy generating sources via a declining block compensation mechanism. On September 12, 2017, the Massachusetts electric utilities jointly filed a model SMART tariff with the MDPU to implement the program and propose a cost recovery mechanism. Hearings on the merits were held in late March and early April 2018. The MDPU issued its Order on September 26, 2018 making the program effective on that date. Utilities are required to file a revised model tariff prior to October 15, 2018 and, once approved, Fitchburg is required to make a company specific compliance filing. On or before November 1 of each year the Company is required to submit to the MDPU its annual SMART Factor cost recovery filing for effect January 1 of the next year. This matter remains pending.

FERC Transmission Formula Rate Proceedings – Pursuant to Section 206 of the Federal Power Act, there are several pending proceedings before the FERC concerning the justness and reasonableness of the Return on Equity (ROE) component of the ISO-New England, Inc. Participating Transmission Owners’ Regional Network Service and Local Network Service formula rates. On April 14, 2017, the U.S. Court of Appeals for the D.C. Circuit issued an opinion vacating a decision of the FERC with respect to the ROE, and remanded it for further proceedings. The FERC had found that the Transmission Owners existing ROE was unlawful, and had set a new ROE. The Court found that the FERC had failed to articulate a satisfactory explanation for its orders. At this time, the ROE set in the vacated order will remain in place until further FERC action is taken. Separately, on March 15, 2018, the Transmission Owners filed a petition for review with the Court of certain orders of the FERC setting for hearing other complaints challenging the allowed return on equity component of the formula rates. Also pending at FERC is a Section 206 proceeding concerning the justness and reasonableness of ISO-New England, Inc. Participating Transmission Owners’ Regional Network Service and Local Network Service formula rates and to develop formula rate protocols for these rates. On August 17, 2018 a joint settlement agreement among a number of the parties was filed with the FERC and remains pending. Fitchburg and Unitil Energy are Participating Transmission Owners, although Unitil Energy does not own transmission plant. To the extent that these proceedings result in any changes to the rates being charged, a retroactive reconciliation may be required. The Company does not believe that these proceedings will have a material adverse impact on the Company’s financial condition or results of operations.

Legal Proceedings

The Company is involved in legal and administrative proceedings and claims of various types, which arise in the ordinary course of business. The Company believes, based upon information furnished by counsel and others, that the ultimate resolution of these claims will not have a material impact on its financial position, operating results or cash flows.

In early 2009, a putative class action complaint was filed against Unitil’s Massachusetts based utility, Fitchburg, in Massachusetts’ Worcester Superior Court, (captioned Bellermann et al v. Fitchburg Gas and Electric Light Company). The Complaint sought an unspecified amount of damages, including the cost of temporary housing and alternative fuel sources, emotional and physical pain and suffering and property damages allegedly incurred by customers in connection with the loss of electric service during the ice storm in Fitchburg’s service territory in December 2008. The Massachusetts Supreme Judicial Court issued an order denying class certification status in July 2016, though the plaintiffs’ individual claims remain pending. The Company continues to believe these claims are without merit and will continue to defend itself vigorously.