OTHER CONTINGENCIES AND COMMITMENTS WILDFIRE-RELATED CONTINGENCIES
Liability Overview

PG&E Corporation and the Utility have significant contingencies arising from their operations, including contingencies related to wildfires. PG&E Corporation and the Utility record a provision for a loss contingency when they determine that it is both probable that a liability has been incurred and the amount of the liability can be reasonably estimated. PG&E Corporation and the Utility evaluate which potential liabilities are probable and the related range of reasonably estimated losses and record a charge that reflects their best estimate or the lower end of the range, if there is no better estimate.
Assessing whether a loss is probable or reasonably possible, whether the loss or a range of losses is estimable, and the amount of the best estimate or lower end of the range often requires management to exercise significant judgment about future events. Management makes these assessments based on a number of assumptions and subjective factors, including negotiations (including those during mediations with claimants), discovery, settlements and payments, rulings, advice of legal counsel, and other information and events pertaining to a particular matter, and estimates based on currently available information and prior experience with wildfires. Unless expressly noted otherwise, the loss accruals in this Note reflect the lower end of the range of the reasonably estimable range of losses. PG&E Corporation and the Utility believe that it is reasonably possible that the amount of loss could be greater than the accrued estimated amounts but are unable to reasonably estimate the additional loss or the upper end of the range because, as described below, there are a number of unknown facts and legal considerations that may impact the amount of any potential liability, including the total scope and nature of claims that may be asserted against PG&E Corporation and the Utility.

Loss contingencies are reviewed quarterly, and estimates are adjusted to reflect the impact of all known information. As more information becomes available, including from potential claimants as litigation or resolution efforts progress, management estimates and assumptions regarding the potential financial impacts of wildfire events may change. For instance, PG&E Corporation and the Utility receive additional information with respect to damages claimed as the claims mediation and trial processes progress. PG&E Corporation’s and the Utility’s provision for loss and expense excludes anticipated outside counsel costs, which are expensed as incurred. PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows may be materially affected by the outcome of the following matters.

Potential liabilities related to wildfires depend on various factors, including the cause of the fire, contributing causes of the fire (including alternative potential origins, weather- and climate-related issues, and forest management and fire suppression practices), the number, size and type of structures damaged or destroyed, the contents of such structures and other personal property damage, the number and types of trees damaged or destroyed, attorneys’ fees for claimants, the nature and extent of any personal injuries, including the loss of lives, the amount of fire suppression and clean-up costs, other damages the Utility may be responsible for if found negligent, and the amount of any penalties, fines, or restitution that may be imposed by courts or other governmental entities.

PG&E Corporation and the Utility are aware of numerous civil complaints related to the following wildfire events and expect that they may receive further complaints. However, the applicable statutes of limitations have expired for the 2019 Kincade fire and 2021 Dixie fire, except for the 2021 Dixie fire USFS statute of limitations which expires in 2027. The complaints include claims based on multiple theories of liability, including inverse condemnation, negligence, violations of the Public Utilities Code, violations of the Health & Safety Code, premises liability, trespass, public nuisance, and private nuisance. The plaintiffs in each action principally assert that PG&E Corporation’s and the Utility’s alleged failure to properly maintain, inspect, and de-energize their power lines was the cause of the relevant wildfire. The timing and outcome for resolution of any such claims or investigations are uncertain. The Utility believes it will continue to receive additional information from potential claimants in connection with these wildfire events as litigation or resolution efforts progress. Any such additional information may potentially allow PG&E Corporation and the Utility to refine the estimates of their accrued losses and may result in changes to the accrual depending on the information received. PG&E Corporation and the Utility intend to vigorously defend themselves against both criminal charges and civil complaints.

If the Utility’s facilities, such as its electric distribution and transmission lines, are judicially determined to be the substantial cause of the following matters, and the doctrine of inverse condemnation applies, the Utility could be liable for property damage, business interruption, interest, and attorneys’ fees without having been found negligent. California courts have imposed liability under the doctrine of inverse condemnation in legal actions brought by property holders against utilities on the grounds that losses borne by the person whose property was damaged through a public use undertaking should be spread across the community that benefited from such undertaking, and based on the assumption that utilities have the ability to recover these costs through rates. Further, California courts have determined that the doctrine of inverse condemnation is applicable regardless of whether the CPUC ultimately allows recovery by the utility for any such costs. The CPUC may decide not to authorize cost recovery even if a court decision were to determine that the Utility is liable as a result of the application of the doctrine of inverse condemnation. In addition to claims for property damage, business interruption, interest, and attorneys’ fees under inverse condemnation, PG&E Corporation and the Utility could be liable for fire suppression costs, evacuation costs, medical expenses, personal injury damages, punitive damages and other damages under other theories of liability in connection with the following wildfire events, including if PG&E Corporation or the Utility were found to have been negligent.
If the liability for wildfires were to exceed $1.0 billion in the aggregate in any Coverage Year, the Utility may be eligible to make a claim to the Wildfire Fund under AB 1054 to satisfy settled or finally adjudicated eligible claims in excess of such amount, except that claims related to the 2019 Kincade fire would be subject to the 40% limitation on the allowed amount of claims arising before emergence from bankruptcy. PG&E Corporation and the Utility intend to continue to review the available information and other information as it becomes available, including evidence in the possession of Cal Fire, USFS, or the relevant district attorney’s office, evidence from or held by other parties, claims that have not yet been submitted, and additional information about the nature and extent of personal and business property damages and losses, the nature, number and severity of personal injuries, and information made available through the discovery process.

The following table presents the cumulative amounts PG&E Corporation and the Utility have paid through March 31, 2025.
Payments (in millions)
2019 Kincade Fire
$1,066 
2021 Dixie Fire1,447 
2022 Mosquito Fire39 
Total at March 31, 2025
$2,552 
2019 Kincade Fire

According to Cal Fire, on October 23, 2019 at approximately 9:27 p.m. Pacific Time, a wildfire began northeast of Geyserville in Sonoma County, California (the “2019 Kincade fire”), located in the service area of the Utility. According to a Cal Fire incident update dated March 3, 2020, 3:35 p.m. Pacific Time, the 2019 Kincade fire consumed 77,758 acres and resulted in no fatalities, four first responder injuries, 374 structures destroyed, and 60 structures damaged. In connection with the 2019 Kincade fire, state and local officials issued numerous mandatory evacuation orders and evacuation warnings. Based on County of Sonoma information, PG&E Corporation and the Utility understand that the geographic zones subject to either a mandatory evacuation order or an evacuation warning between October 23, 2019 and November 4, 2019 included approximately 200,000 persons.

On July 16, 2020, Cal Fire issued a press release with its determination that the Utility’s equipment caused the 2019 Kincade fire.

As of April 16, 2025, PG&E Corporation and the Utility are aware of approximately 134 complaints on behalf of at least 2,983 plaintiffs related to the 2019 Kincade fire. The plaintiffs filed master complaints on July 16, 2021; PG&E Corporation’s and the Utility’s response was filed on August 16, 2021; and PG&E Corporation and the Utility filed a demurrer with respect to the plaintiffs’ inverse condemnation claims. On December 10, 2021, the court overruled the demurrer. On July 20, 2022, PG&E Corporation and the Utility filed a motion for summary adjudication on individual plaintiffs’ claims for punitive damages. On July 14, 2024, the court vacated the bellwether trial date that had been scheduled for August 26, 2024, as well as the hearing on the motion for summary adjudication.

PG&E Corporation and the Utility are also aware of a complaint on behalf of Geysers Power Company, Calpine Corporation, and CPN Insurance Corporation. The court scheduled a trial on their claims for August 4, 2025. The parties have reached settlements in principle for these claims and expect that the trial date will be vacated.

On October 11, 2022, the Utility entered into a tolling agreement with the California Governor’s Office of Emergency Services (“Cal OES”), extending their time to file a complaint.

Based on the current state of the law concerning inverse condemnation in California and the facts and circumstances available to PG&E Corporation and the Utility as of the date of this filing, including Cal Fire’s determination of the cause and the information gathered as part of PG&E Corporation’s and the Utility’s investigation, PG&E Corporation and the Utility believe it is probable that they will incur a loss in connection with the 2019 Kincade fire. PG&E Corporation and the Utility recorded a liability in the aggregate amount of $1.225 billion as of December 31, 2024 (before available insurance). Based on the facts and circumstances available to PG&E Corporation and the Utility as of the date of this filing, including their experience with settlements, PG&E Corporation and the Utility recorded additional charges during the first quarter of 2025 of $50 million for an aggregate liability of $1.275 billion (before available insurance).

PG&E Corporation’s and the Utility’s accrued estimated losses of $1.275 billion do not include, among other things: (i) any punitive damages, (ii) any amounts in respect of compensation claims by federal or state agencies other than state fire suppression costs, or (iii) any other amounts that are not reasonably estimable.
The following table presents changes in the lower end of the range of PG&E Corporation’s and the Utility’s reasonably estimable losses, net of payments, for claims arising from the 2019 Kincade fire since December 31, 2024.
Loss Accrual (in millions)
Balance at December 31, 2024
$267 
Accrued Losses50 
Payments(108)
Balance at March 31, 2025
$209 

The Utility has fully collected its liability insurance coverage for third-party liability attributable to the 2019 Kincade fire, which was for an aggregate amount of $430 million.
2021 Dixie Fire

According to the Cal Fire Investigation Report on the 2021 Dixie fire (the “Cal Fire Investigation Report”), on July 13, 2021, at approximately 5:07 p.m. Pacific Time, a wildfire began in the Feather River Canyon near Cresta Dam (the “2021 Dixie fire”), located in the service area of the Utility. According to the Cal Fire Investigation Report, the 2021 Dixie fire consumed 963,309 acres and resulted in 1,311 structures destroyed and 94 structures damaged (including 763 residential homes, 12 multi-family homes, 8 commercial residential homes, 148 nonresidential commercial structures, and 466 detached structures), and four first-responder injuries. The Cal Fire Investigation Report does not attribute a fatality that was previously published in an October 25, 2021 Cal Fire incident report to the 2021 Dixie fire.

On January 4, 2022, Cal Fire issued a press release with its determination that the 2021 Dixie fire was caused by a tree contacting electrical distribution lines owned and operated by the Utility. On June 7, 2022, the Utility received a copy of the Cal Fire Investigation Report, which states that the fire ignited when a tree fell and contacted electrical distribution lines owned and operated by the Utility, and the Cal Fire Investigation Report has been made publicly available. The Cal Fire Investigation Report alleges that the Utility acted negligently in its response to the initial outage and fault that caused the 2021 Dixie fire. The Cal Fire Investigation Report also alleges that the subject tree had visible outward signs of damage and decay which would have been noticeable at the ground level, and that a brief visual inspection should have discovered the decay. Based on the information currently available to the Utility, through its ongoing investigation, including its inspection records, operating and inspection protocols and procedures, implementation of those protocols and procedures, and day-of-event response, the Utility believes its personnel acted reasonably (within the meaning of the applicable prudency standard discussed under “Regulatory Recovery” below) given the information available at the time and followed applicable policies and protocols both before ignition and in the day-of-event response. While an intervenor in a future cost recovery proceeding may argue the Cal Fire Investigation Report itself creates serious doubt with respect to the reasonableness of the Utility’s conduct, PG&E Corporation and the Utility do not believe the report identifies sufficient facts to shift the burden of proof applicable in a proceeding for cost recovery to the Utility. (See “Regulatory Recovery” and “Wildfire Fund under AB 1054” below.) PG&E Corporation and the Utility disagree with many allegations in the Cal Fire Investigation Report and plan to vigorously contest them. However, if the CPUC or the FERC were to reach conclusions similar to those of the Cal Fire Investigation Report, it may determine that the Utility had been imprudent, in which case some or all of its costs recorded to the WEMA would not be recoverable, the Utility would not be able to recover costs through FERC TO rates, or the Utility would be required to reimburse the Wildfire Fund for the costs and expenses that are allocated to it.

As of April 16, 2025, PG&E Corporation and the Utility are aware of approximately 183 complaints on behalf of at least 8,687 individual plaintiffs related to the 2021 Dixie fire and expect that they may receive further complaints. The plaintiffs seek damages that include wrongful death, property damage, economic loss, medical monitoring, punitive damages, exemplary damages, attorneys’ fees and other damages. The court has scheduled and vacated numerous bellwether trial dates, including the previously scheduled bellwether trial date of June 23, 2025. As of April 23, 2025, there was no bellwether trial date scheduled.

The Collins Pine Company and a group of timber companies filed a complaint against PG&E Corporation and the Utility on April 10, 2024. PG&E Corporation and the Utility answered this complaint on May 28, 2024.
Cal Fire filed a complaint against the Utility to recover suppression and investigation costs on June 30, 2023. The Utility filed an amended answer to the complaint on September 30, 2024. On October 10, 2024, Cal Fire filed a demurrer and motion to strike portions of the amended answer. On February 7, 2025, the court issued a ruling sustaining Cal Fire’s demurrer and striking portions of the Utility’s amended answer. On April 7, 2025, PG&E Corporation and the Utility filed a petition for writ of mandate in the California First District Court of Appeal, seeking an order directing the trial court to reverse the ruling on Cal Fire’s demurrer and motion to strike. On April 15, 2025, the Court of Appeal requested that Cal Fire file an opposition to PG&E Corporation’s and the Utility’s writ by April 30, 2025. The Court also permits PG&E Corporation and the Utility to file a reply to the opposition by May 9, 2025.

On February 7, 2023, the Utility entered into a tolling agreement with Cal OES, extending the agency’s time to file a complaint.

PG&E Corporation and the Utility are aware of a separate putative class complaint. After PG&E Corporation and the Utility demurred to the putative class complaint, the court issued an order abating the case unless the plaintiff amended the complaint, which the plaintiff did on February 12, 2025. On March 18, 2025, PG&E Corporation and the Utility filed an answer, and on April 18, 2025 filed an amended answer.

Based on the current state of the law concerning inverse condemnation in California and the facts and circumstances available to PG&E Corporation and the Utility as of the date of this filing, including Cal Fire’s determination of the cause and the information gathered as part of PG&E Corporation’s and the Utility’s investigation, PG&E Corporation and the Utility believe it is probable that they will incur a loss in connection with the 2021 Dixie fire. PG&E Corporation and the Utility recorded a liability in the aggregate amount of $1.925 billion as of December 31, 2024 (before available insurance). The aggregate liability remained unchanged as of March 31, 2025.

PG&E Corporation’s and the Utility’s accrued estimated losses of $1.925 billion do not include, among other things: (i) any amounts for potential penalties or fines that may be imposed by courts or other governmental entities on PG&E Corporation or the Utility, (ii) any punitive damages, (iii) any amounts in respect of compensation claims by federal or state agencies other than Cal Fire, including for fire suppression costs and damages related to federal land, (iv) class action medical monitoring costs, or (v) any other amounts that are not reasonably estimable.

As noted above, the aggregate estimated liability for claims in connection with the 2021 Dixie fire does not include potential claims for fire suppression costs, other than Cal Fire, or damage to land and vegetation in national parks or national forests. As to these damages, PG&E Corporation and the Utility have not concluded that a loss is probable. PG&E Corporation and the Utility are unable to reasonably estimate the range of possible losses for any such claims due to, among other factors, incomplete information as to facts pertinent to potential claims and defenses, as well as facts that would bear on the amount, type, and valuation of vegetation loss, potential reforestation, habitat loss, and other resources damaged or destroyed by the 2021 Dixie fire. PG&E Corporation and the Utility believe, however, that such losses could be significant with respect to fire suppression costs due to the size and duration of the 2021 Dixie fire and corresponding magnitude of fire suppression resources dedicated to fighting the 2021 Dixie fire and with respect to claims for damage to land and vegetation in national parks or national forests due to the very large number of acres of national parks and national forests that were affected by the 2021 Dixie fire. According to the Cal Fire Investigation Report, over $650 million of costs had been incurred in suppressing the 2021 Dixie fire. The Utility estimates that the fire burned approximately 70,000 acres of national parks and approximately 685,000 acres of national forests.

The following table presents changes in the lower end of the range of PG&E Corporation’s and the Utility’s reasonably estimable losses, net of payments, for claims arising from the 2021 Dixie fire since December 31, 2024.
Loss Accrual (in millions)
Balance at December 31, 2024
$567 
Accrued Losses— 
Payments(87)
Balance at March 31, 2025
$480 

As of March 31, 2025, the Utility recorded an insurance receivable of $527 million for probable insurance recoveries in connection with the 2021 Dixie fire.
The Utility recorded an aggregate Wildfire Fund receivable of $925 million for probable recoveries in connection with the 2021 Dixie fire, of which it had received $350 million as of March 31, 2025. AB 1054 provides that the CPUC may allocate costs and expenses in the application for cost recovery in full or in part taking into account factors both within and beyond the utility’s control that may have exacerbated the costs and expenses, including humidity, temperature, and winds. PG&E Corporation and the Utility believe that, even if it found that the Utility acted unreasonably, the CPUC would nevertheless authorize recovery in part. See “Wildfire Fund under AB 1054” below. As of March 31, 2025, the Utility also recorded a $94 million reduction to its regulatory liability for wildfire-related claims costs that were determined to be probable of recovery through the FERC TO formula rate and a $515 million regulatory asset for costs that were determined to be probable of recovery through the WEMA. See “Regulatory Recovery” below. Decreases in the amount of the insurance receivable for the 2021 Dixie fire may also increase the amount that is probable of recovery through the FERC TO formula rate and the WEMA.
2022 Mosquito Fire

On September 6, 2022, at approximately 6:17 p.m. Pacific Time, the Utility was notified that a wildfire had ignited near Oxbow Reservoir in Placer County, California (the “2022 Mosquito fire”), located in the service area of the Utility. The National Wildfire Coordinating Group’s InciWeb incident overview dated November 4, 2022 at 6:30 p.m. Pacific Time indicated that the 2022 Mosquito fire had consumed approximately 76,788 acres at that time. It also indicated no fatalities, no injuries, 78 structures destroyed, and 13 structures damaged (including 44 residential homes and 40 detached structures) and that the fire was 100% contained.

The USFS has indicated to the Utility an initial assessment that the fire started in the area of the Utility’s power line on National Forest System lands and that the USFS is conducting a criminal investigation into the 2022 Mosquito fire. On September 24, 2022, the USFS removed and took possession of one of the Utility’s transmission poles and attached equipment. The USFS has not issued a determination as to the cause.

The cause of the 2022 Mosquito fire remains under investigation by the USFS, the United States Department of Justice, and the CPUC. PG&E Corporation and the Utility are cooperating with the investigations. It is uncertain when any such investigations will be complete. PG&E Corporation and the Utility are also conducting their own investigation into the cause of the 2022 Mosquito fire. This investigation is ongoing.

As of April 16, 2025, PG&E Corporation and the Utility are aware of approximately 25 complaints on behalf of at least 2,716 individual plaintiffs related to the 2022 Mosquito fire and expect that they may receive further complaints. Placer County Water Agency (“PCWA”), Middle Fork Project Finance Authority, and a group of six public entities have each filed complaints. The plaintiffs seek damages that include property damage, economic loss, punitive damages, exemplary damages, attorneys’ fees, and other damages. On April 24, 2024, PG&E Corporation and the Utility filed cross-complaints against PCWA, alleging that conduct by PCWA was a substantial cause of the 2022 Mosquito fire. The cross-complaints seek property damages, indemnification, attorneys’ fees, and other damages. On January 28, 2025, the court entered an order setting the first individual claimant bellwether trial for November 7, 2025.

Based on the current state of the law concerning inverse condemnation in California and the facts and circumstances available to PG&E Corporation and the Utility as of the date of this filing, including the information gathered as part of PG&E Corporation’s and the Utility’s investigation, PG&E Corporation and the Utility believe it is probable that they will incur a loss in connection with the 2022 Mosquito fire. Based on the facts and circumstances available to PG&E Corporation and the Utility as of the date of this report, PG&E Corporation and the Utility recorded a liability in the aggregate amount of $100 million as of December 31, 2024 (before available insurance). The aggregate liability remained unchanged as of March 31, 2025.

PG&E Corporation’s and the Utility’s accrued estimated losses do not include, among other things: (i) any amounts for potential penalties or fines that may be imposed by courts or other governmental entities on PG&E Corporation or the Utility, (ii) any punitive damages, (iii) any amounts in respect of compensation claims by federal or state agencies including for state or federal fire suppression costs and damages related to federal land, or (iv) any other amounts that are not reasonably estimable.

As noted above, the aggregate estimated liability for claims in connection with the 2022 Mosquito fire does not include potential claims for fire suppression costs from federal, state, county, or local agencies or damage to land and vegetation in national parks or national forests. As to these damages, PG&E Corporation and the Utility have not concluded that a loss is probable. PG&E Corporation and the Utility are unable to reasonably estimate the range of possible losses for any such claims due to, among other factors, incomplete information as to facts pertinent to potential claims and defenses, as well as facts that would bear on the amount, type, and valuation of vegetation loss, potential reforestation, habitat loss, and other resources damaged or destroyed by the 2022 Mosquito fire.
The following table presents changes in the lower end of the range of PG&E Corporation’s and the Utility’s reasonably estimable losses, net of payments, for claims arising from the 2022 Mosquito fire since December 31, 2024.
Loss Accrual (in millions)
Balance at December 31, 2024
$82 
Accrued Losses— 
Payments(21)
Balance at March 31, 2025
$61 

As of March 31, 2025, the Utility recorded an insurance receivable of $96 million for probable insurance recoveries in connection with the 2022 Mosquito fire, including legal fees. As of March 31, 2025, the Utility also recorded a $7 million reduction to its regulatory liability for wildfire-related claims costs that were determined to be probable of recovery through the FERC TO formula rate and a $54 million regulatory asset for costs that were determined to be probable of recovery through the WEMA. See “Regulatory Recovery” below.
Loss Recoveries

PG&E Corporation and the Utility have recovery mechanisms available for wildfire liabilities including from insurance, through rates, and from the Wildfire Fund. PG&E Corporation and the Utility record a receivable for a recovery when it is deemed probable that recovery of a recorded loss will occur, and the Utility can reasonably estimate the amount or its range. While the Utility plans to seek recovery of all insured losses, it is unable to predict the ultimate amount and timing of such recoveries. For more information on the applicable facts and circumstances of the corresponding wildfires, see “2019 Kincade Fire,” “2021 Dixie Fire,” and “2022 Mosquito Fire.”

Total probable recoveries for the 2021 Dixie fire and the 2022 Mosquito fire as of March 31, 2025 are:
Potential Recovery Source (in millions)2021 Dixie fire2022 Mosquito fire
Insurance$527 $96 
FERC TO rates
94 
WEMA
515 54 
Wildfire Fund
925 — 
Probable recoveries at March 31, 2025 (1)
$2,061 $157 
(1) Includes legal costs of $117 million and $50 million related to the 2021 Dixie fire and 2022 Mosquito fire, respectively, as of March 31, 2025.

The Utility could be subject to significant liability in connection with these wildfire events. If such liability is not recoverable from insurance or the other mechanisms described in this section, it could have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.
Insurance
Self-Insurance

Since August 2023, the Utility’s wildfire liability insurance for amounts up to $1.0 billion has been entirely based on self-insurance and will remain as such through at least 2026. The self-insurance program includes a 5% deductible, capped at a maximum of $50 million, on claims that are incurred each year.
Insurance Receivable

As of March 31, 2025, PG&E Corporation and the Utility have recorded total probable insurance recoveries of $527 million and $96 million in connection with the 2021 Dixie fire and the 2022 Mosquito fire, respectively. PG&E Corporation and the Utility intend to seek full recovery for all insured losses.
The balances for insurance receivables with respect to wildfires are included in Other accounts receivable in PG&E Corporation’s and the Utility’s Condensed Consolidated Balance Sheets. The following table presents changes in accrued insurance recoveries, net of reimbursements received, for the 2021 Dixie fire and 2022 Mosquito fire since December 31, 2024:
Insurance Receivable (in millions)2021 Dixie fire2022 Mosquito fireTotal
Balance at December 31, 2024
$27 $90 $117 
Accrued insurance recoveries
— 
Reimbursements
— — — 
Balance at March 31, 2025
$27 $95 $122 
Regulatory Recovery

Section 451.1 of the Public Utilities Code provides that when determining an application to recover costs and expenses arising from a covered wildfire, the CPUC shall allow cost recovery if the costs and expenses are just and reasonable (i.e., the “prudency standard”). AB 1054 states that a utility with a valid safety certification for the time period in which a covered wildfire ignited “shall be deemed to have been reasonable” unless “a party to the proceeding creates a serious doubt as to the reasonableness of the Utility’s conduct,” in which case the burden shifts to the utility to prove its conduct was reasonable. The Utility had a valid safety certification at the time of the 2021 Dixie fire and the 2022 Mosquito fire, so any analysis of cost recovery starts with this reasonableness presumption. AB 1054 also allows the CPUC to allocate costs and expenses “in full or in part taking into account factors both within and beyond the Utility’s control that may have exacerbated the costs and expenses, including humidity, temperature, and winds.”

The Utility’s recorded receivables under the WEMA and with respect to the Wildfire Fund take into account this revised prudency standard and the presumption of reasonableness of the Utility’s conduct, based on the Utility’s interpretation of AB 1054 and the information currently available to the Utility. Although the concept of “serious doubt” has been applied in other regulatory proceedings, such as FERC proceedings, the revised prudency standard under AB 1054 has not been interpreted or applied by the CPUC and it is possible that the CPUC could interpret or apply the standard differently, in which case the Utility may not be able to recover all or a portion of expenses that it has recorded as a receivable.

FERC TO Rates

The Utility recognizes income and reduces its regulatory liability for potential refund through future FERC TO formula rates for a portion of the third-party wildfire-related claims in excess of insurance coverage. The FERC presumes that a utility’s expenditures are prudent and permits cost recovery unless a party raises a serious doubt regarding the prudency of such costs. The allocation to transmission customers was based on a FERC-approved allocation factor as determined in the formula rate. Based on information currently available to the Utility regarding the 2021 Dixie fire and the 2022 Mosquito fire, as of March 31, 2025, the Utility recorded reductions of $94 million and $7 million, respectively, to its regulatory liability for wildfire-related claims costs that were determined to be probable of recovery through the FERC TO formula rate.

WEMA

The WEMA provides for tracking of incremental wildfire claims, outside legal costs, and insurance premiums above those authorized in rates. With respect to wildfire claims and outside legal costs, the Utility expects that the same prudency standard as applies to the Wildfire Fund would also be applied in any CPUC review of an application filed by the Utility seeking recovery of such costs recorded to the WEMA. See “Wildfire Fund under AB 1054” below. As of March 31, 2025, based on information currently available to the Utility, incremental wildfire claims-related costs for the 2021 Dixie fire and the 2022 Mosquito fire were determined to be probable of recovery and the Utility recorded $515 million and $54 million, respectively, as regulatory assets in the WEMA.
Wildfire Fund under AB 1054

On July 12, 2019, AB 1054 became law. The law provides for the establishment of a statewide fund that will be available for eligible electric utility companies to pay eligible claims for liabilities arising from wildfires occurring after July 12, 2019 that are caused by the applicable electric utility company’s equipment, subject to the terms and conditions of AB 1054. Each of California’s large electric IOUs has elected to participate in the Wildfire Fund. Eligible claims are claims for third-party damages resulting from any such wildfires, limited to the portion of such claims that exceeds the greater of (i) $1.0 billion in the aggregate arising from wildfires in any Coverage Year and (ii) the amount of insurance coverage required to be in place for the electric utility company pursuant to Section 3293 of the Public Utilities Code, added by AB 1054. The accrued Wildfire Fund receivable as of March 31, 2025 reflects an expectation that the Coverage Year will be based on the calendar year.

Electric utility companies that draw from the Wildfire Fund will only be required to reimburse amounts that are determined by the CPUC in a proceeding for cost recovery not to be just and reasonable, applying the prudency standard in AB 1054 and after allocating costs and expenses for cost recovery based on relevant factors both within and outside of a utility’s control that may have exacerbated the costs and expenses. This reimbursement requirement is subject to a disallowance cap equal to 20% of the equity portion of the IOU’s electric transmission and distribution rate base in the year of the prudency determination. A utility would not be required to reimburse the Wildfire Fund for disallowances that exceed the disallowance cap in the aggregate in a three calendar-year period. For the Utility, the disallowance cap would be approximately $4.7 billion for 2025. This disallowance cap is based on the equity portion of the Utility’s forecasted weighted-average 2025 electric transmission and distribution rate base, which is subject to adjustment based on changes in the Utility’s electric transmission and distribution rate base. The disallowance cap is inapplicable in certain circumstances, including if the Wildfire Fund administrator determines that the electric utility company’s actions or inactions that resulted in the applicable wildfire constituted “conscious or willful disregard for the rights and safety of others,” or the electric utility company failed to maintain a valid safety certification. Costs that the CPUC determines to be just and reasonable in accordance with the prudency standard in AB 1054 will not be reimbursed to the Wildfire Fund, resulting in a draw-down of the Wildfire Fund.

Before the expiration of any current safety certification, the Utility must request a new safety certification from the OEIS, which the Utility expects to be issued within 90 days if the Utility has provided documentation that it has satisfied the requirements for the safety certification pursuant to Section 8389(e) of the Public Utilities Code, added by AB 1054. An issued safety certification is valid for 12 months or until a timely request for a new safety certification is acted upon, whichever occurs later. The safety certification is separate from the CPUC’s enforcement authority and does not preclude the CPUC from pursuing remedies for safety or other applicable violations. On December 11, 2024, the OEIS approved the Utility’s 2024 application and issued the Utility’s 2024 safety certification.

The Wildfire Fund and disallowance cap will be terminated when the amounts in the fund are exhausted. The Wildfire Fund is expected to be capitalized with at least $21 billion through (i) a 15-year non-bypassable charge to customers, (ii) $7.5 billion in initial contributions from California’s three large electric IOUs and (iii) $300 million in annual contributions paid by the participating electric IOUs for a 10-year period.

The Wildfire Fund will only be available for payment of eligible claims so long as there are sufficient funds remaining in the Wildfire Fund. Such funds could be depleted more quickly than PG&E Corporation’s and the Utility’s 20-year estimate for the life of the Wildfire Fund, including as a result of claims made by California’s other participating electric utility companies. The Wildfire Fund is available to pay for the Utility’s eligible claims arising as of July 12, 2019, the effective date of AB 1054, subject to a limit of 40% of the allowed amount of such claims arising between the effective date of AB 1054 and the Utility’s emergence from Chapter 11. The 40% limit does not apply to eligible claims that arise after the Utility’s emergence from Chapter 11. AB 1054 authorizes the reimbursement of funds where a participating utility has demonstrated that it exercised reasonable business judgment in the valuation and payment of third-party claims.

As of March 31, 2025, PG&E Corporation and the Utility recorded $550 million and $25 million in Accounts receivable - other and Other noncurrent assets, respectively, for Wildfire Fund receivables related to the 2021 Dixie fire. The following table presents changes in accrued Wildfire Fund recoveries, net of claims paid by the Wildfire Fund received, for the 2021 Dixie fire since December 31, 2024:
Wildfire Fund Receivable (in millions)2021 Dixie fire
Balance at December 31, 2024
$756 
Accrued Wildfire Fund recoveries— 
Claims paid by Wildfire Fund(181)
Balance at March 31, 2025
$575 
For more information, see Note 2 above.
Wildfire-Related Securities Litigation

As further described under the headings “Wildfire-Related Securities Claims in District Court” and “Wildfire-Related Securities Claims—Claims in the Bankruptcy Court Process,” PG&E Corporation and the Utility face certain wildfire-related securities claims related to the 2017 Northern California wildfires and other claims related to the 2018 Camp fire and the PSPS program in the Chapter 11 Cases (i.e., the Subordinated Claims), and certain former directors, former officers, and underwriters of certain note offerings face wildfire-related securities claims in the District Court action. The claims described under the heading “Wildfire-Related Securities Claims in District Court” are referred to as the “Wildfire-Related Non-Bankruptcy Securities Claims” and collectively with the claims described under the heading “Wildfire-Related Securities Claims—Claims in the Bankruptcy Court Process” are referred to in this section as the “Wildfire-Related Securities Claims.”

Based on the facts and circumstances available to PG&E Corporation and the Utility as of the date of this filing, PG&E Corporation believes it is probable that it will incur a loss in connection with these matters. PG&E Corporation has recorded a liability in the aggregate amount of $300 million, which represents its best estimate of probable losses for the Wildfire-Related Securities Claims. PG&E Corporation believes that it is reasonably possible that the amount of loss could be greater or less than the accrued estimated amount due to the number of plaintiffs and the complexity of the litigation, and because a class settlement, if any, would be subject to, among other things, approval by the Bankruptcy Court and the District Court, and class members would have the right to opt out of any such settlement.
Wildfire-Related Securities Claims in District Court

In June 2018, two purported securities class actions were filed in the District Court, naming PG&E Corporation and certain of its former officers as defendants, entitled David C. Weston v. PG&E Corporation, et al. and Jon Paul Moretti v. PG&E Corporation, et al., respectively. The complaints alleged material misrepresentations and omissions in various PG&E Corporation public disclosures related to, among other things, vegetation management and other issues connected to the 2017 Northern California wildfires. The complaints asserted claims under Section 10(b) and Section 20(a) of the Exchange Act and Rule 10b-5 promulgated thereunder, and sought unspecified monetary relief, interest, attorneys’ fees and other costs. Both complaints identified a proposed class period of April 29, 2015 to June 8, 2018. On September 10, 2018, the court consolidated both cases, and the litigation is now denominated In re PG&E Corporation Securities Litigation, U.S. District Court for the Northern District of California, Case No. 18-03509. The court also appointed PERA as lead plaintiff. PERA filed a consolidated amended complaint on November 9, 2018. On December 14, 2018, PERA filed a second amended consolidated complaint to add allegations regarding the 2018 Camp fire, including allegations regarding transmission line safety and the PSPS program.

On February 22, 2019, a third purported securities class action was filed in the District Court, entitled York County on behalf of the York County Retirement Fund, et al. v. Rambo, et al. (the “York County Action”). The complaint named as defendants certain former officers and directors, as well as the underwriters of four public offerings of notes from 2016 to 2018. Neither PG&E Corporation nor the Utility was named as a defendant. The complaint asserted claims under Section 11 of the Securities Act of 1933, as amended, based on alleged material misrepresentations and omissions in connection with the note offerings related to, among other things, PG&E Corporation’s and the Utility’s vegetation management and wildfire safety measures. On May 7, 2019, the York County Action was consolidated with In re PG&E Corporation Securities Litigation.

On May 28, 2019, the plaintiffs in the consolidated securities actions filed a third amended consolidated class action complaint, which includes the claims asserted in the previously filed actions and names as defendants PG&E Corporation, the Utility, certain former officers and directors, and the underwriters. On October 4, 2019, the officer, director, and underwriter defendants filed motions to dismiss the third amended complaint.

On March 21, 2023, another group of shareholders filed a separate action in the District Court against certain former officers and directors, entitled Orbis Capital Limited et al., v. Williams et al., alleging similar claims to those alleged in In re PG&E Corporation Securities Litigation.

On August 21, 2024, the District Court entered an order setting a briefing schedule for renewed motions to dismiss the third amended complaint. Opening briefs were filed on October 24, 2024, opposition briefs were filed December 20, 2024, and reply briefs were filed January 31, 2025.
Wildfire-Related Securities Claims—Claims in the Bankruptcy Court Process

PG&E Corporation and the Utility intend to resolve securities claims filed in the bankruptcy consistent with the Plan. These claims consist of pre-petition claims against PG&E Corporation or the Utility under the federal securities laws related to, among other things, allegedly misleading statements or omissions with respect to vegetation management and wildfire safety disclosures, and are classified into separate categories under the Plan, each of which is subject to subordination under the United States Bankruptcy Code. The first category of claims consists of pre-petition claims arising from or related to the trading of common stock of PG&E Corporation (such claims, with certain other similar claims against PG&E Corporation, the “HoldCo Rescission or Damage Claims”). The second category of pre-petition claims, which comprises two separate classes under the Plan, consists of claims arising from the trading of debt securities issued by PG&E Corporation and the Utility (such claims, with certain other similar claims against PG&E Corporation and the Utility, the “Subordinated Debt Claims,” and together with the HoldCo Rescission or Damage Claims, the “Subordinated Claims”).

While PG&E Corporation and the Utility believe they have defenses to the Subordinated Claims, these defenses may not prevail and proceeds from any insurance may not be adequate to cover the full amount of the allowed claims. In that case, PG&E Corporation and the Utility will be required, pursuant to the Plan, to satisfy any such allowed claims as follows:

each holder of an allowed HoldCo Rescission or Damage Claim will receive a number of shares of common stock of PG&E Corporation equal to such holder’s HoldCo Rescission or Damage Claim Share (as such term is defined in the Plan); and

each holder of an allowed Subordinated Debt Claim will receive payment in full in cash.

PG&E Corporation and the Utility have engaged in settlement efforts with respect to the Subordinated Claims. All such settlements have been conditioned upon, among other things, resolution of that claimant’s Wildfire-Related Non-Bankruptcy Securities Claims. If any of the Subordinated Claims are ultimately not settled, PG&E Corporation and the Utility expect that those Subordinated Claims will be resolved by the Bankruptcy Court in the claims reconciliation process and treated as described above under the Plan. Under the Plan, after the Emergence Date, PG&E Corporation and the Utility have the authority to compromise, settle, object to, or otherwise resolve proofs of claim, and the Bankruptcy Court retains jurisdiction to hear disputes arising in connection with disputed claims. With respect to the Subordinated Claims, the claims reconciliation process may include litigation of the merits of such claims, including the filing of motions, fact discovery, and expert discovery. The total number and amount of allowed Subordinated Claims, if any, was not determined at the Emergence Date. To the extent any such claims are allowed, the total amount of such claims could be material, and therefore could result in (a) the issuance of a material number of shares of common stock of PG&E Corporation with respect to allowed HoldCo Rescission or Damage Claims, or (b) the payment of a material amount of cash with respect to allowed Subordinated Debt Claims. Such claims could have a material adverse impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

Further, if shares are issued in respect of allowed HoldCo Rescission or Damage Claims, it may be determined that, under the Plan, the Fire Victim Trust should receive additional shares of common stock of PG&E Corporation such that it would have owned 22.19% of the outstanding common stock of reorganized PG&E Corporation on the Emergence Date, assuming that such issuance of shares in satisfaction of the HoldCo Rescission or Damage Claims had occurred on the Emergence Date.

On January 25, 2021, the Bankruptcy Court issued an order to approve procedures to help facilitate the resolution of the Subordinated Claims. The order, among other things, established procedures allowing PG&E Corporation and the Utility to collect trading information with respect to the Subordinated Claims, to engage in an alternative dispute resolution process for resolving disputed Subordinated Claims, and to file certain omnibus claim objections with respect to the Subordinated Claims.

PG&E Corporation and the Utility have worked to resolve the Subordinated Claims in accordance with procedures approved by the Bankruptcy Court, including by collecting trading information from holders of Subordinated Claims. Also, pursuant to those procedures, PG&E Corporation and the Utility have filed numerous omnibus objections in the Bankruptcy Court to certain of the Subordinated Claims. The Bankruptcy Court has entered several orders disallowing and expunging Subordinated Claims that were subject to these omnibus objections, and certain Subordinated Claims subject to these omnibus objections remain pending. PG&E Corporation and the Utility expect to continue to prosecute omnibus objections with respect to certain of the Subordinated Claims and act under the procedures approved by the Bankruptcy Court to resolve the Subordinated Claims.
Indemnification Obligations

To the extent permitted by law, PG&E Corporation and the Utility have obligations to indemnify directors and officers for certain events or occurrences while a director or officer is or was serving in such capacity, which indemnification obligations may extend to the claims asserted against certain directors and officers in the securities class actions.

PG&E Corporation and the Utility additionally may have indemnification obligations to the underwriters for the Utility’s note offerings, pursuant to the underwriting agreements associated with those offerings. PG&E Corporation’s and the Utility’s indemnification obligations to the officers, directors and underwriters may be limited or affected by the Chapter 11 Cases, among other things.
Butte County District Attorney’s Office Investigation into the 2018 Camp Fire

Following the 2018 Camp fire, the Butte County District Attorney’s Office and the California Attorney General’s Office opened a criminal investigation of the 2018 Camp fire.

On March 17, 2020, the Utility entered into the Plea Agreement and Settlement (the “Plea Agreement”) with the People of the State of California, by and through the Butte County District Attorney’s Office to resolve the criminal prosecution of the Utility in connection with the 2018 Camp fire. Subject to the terms and conditions of the Plea Agreement, the Utility pleaded guilty to 84 counts of involuntary manslaughter in violation of Penal Code section 192(b) and one count of unlawfully causing a fire in violation of Penal Code section 452, and to admit special allegations pursuant to Penal Code sections 452.1(a)(2), 452.1(a)(3) and 452.1(a)(4).

On August 20, 2021, the Butte County Superior Court held a brief hearing on the status of restitution, which involves distribution of funds from the Fire Victim Trust. The Butte County Superior Court has since continued the hearing to November 14, 2025.
OTHER CONTINGENCIES AND COMMITMENTS
PG&E Corporation and the Utility have significant contingencies arising from their operations, including contingencies related to enforcement and litigation matters and environmental remediation.  A provision for a loss contingency is recorded when it is both probable that a loss has been incurred and the amount of the loss can be reasonably estimated.  PG&E Corporation and the Utility evaluate the range of reasonably estimated losses and record a provision based on the lower end of the range, unless an amount within the range is a better estimate than any other amount.  The assessments of whether a loss is probable or reasonably possible, and whether the loss or a range of loss is estimable, often involve a series of complex judgments about future events.  Loss contingencies are reviewed quarterly, and estimates are adjusted to reflect the impact of all known information, such as negotiations, discovery, settlements and payments, rulings, penalties related to regulatory compliance, advice of legal counsel, and other information and events pertaining to a particular matter.  PG&E Corporation and the Utility exclude anticipated legal costs from the provision for loss and expense these costs as incurred. The Utility also has substantial financial commitments in connection with agreements entered into to support its operating activities.  See “Purchase Commitments” below.  PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows may be materially affected by the outcome of the following matters.
CPUC and FERC Matters
2022 WMCE Interim Rate Relief Subject to Refund

On December 15, 2022, the Utility filed an application with the CPUC requesting cost recovery of approximately $1.36 billion of recorded expenditures, resulting in a proposed revenue requirement of approximately $1.29 billion (the “2022 WMCE application”). The costs addressed in the 2022 WMCE application reflect costs related to wildfire mitigation and certain catastrophic events, as well as the implementation of various customer-focused initiatives. These costs were incurred primarily in 2021.

The recorded expenditures consist of $1.2 billion in expenses and $136 million in capital expenditures. On June 8, 2023, the CPUC adopted a final decision granting the Utility interim rate relief of $1.1 billion to be recovered over 12 months, which went into effect July 1, 2023. The remaining $224 million will be recovered to the extent it is approved after the CPUC issues a final decision for such requested rate relief. Cost recovery requested in the 2022 WMCE application is subject to the CPUC’s reasonableness review, which could result in some or all of the interim rate relief being subject to refund.
2023 WMCE Interim Rate Relief Subject to Refund

On December 1, 2023, the Utility filed an application with the CPUC requesting cost recovery of approximately $2.18 billion of recorded expenditures, resulting in a proposed revenue requirement of approximately $1.86 billion (the “2023 WMCE application”). The costs addressed in the 2023 WMCE application reflect costs related to wildfire mitigation and certain catastrophic events, as well as implementation of various customer-focused initiatives. These costs were incurred primarily in 2022.

The recorded expenditures consist of $1.6 billion in expenses and $559 million in capital expenditures. Of these amounts, approximately 15% of expense, or $239 million, and 30% of capital expenditures, or $167 million, relate to the Utility’s response to the 2022-2023 extreme winter storms CEMA event.

On September 16, 2024, the CPUC issued a final decision on interim rate that grants the Utility interim rate relief of $944 million, plus interest, subject to refund, to be recovered over at least 17 months starting October 1, 2024. The remaining $914 million, plus interest, would be recovered to the extent it is approved after the CPUC issues a final decision. Cost recovery requested in the 2023 WMCE application is subject to the CPUC’s reasonableness review, which could result in some or all of the interim rate relief being subject to refund.
Wildfire and Gas Safety Costs Interim Rate Relief Subject to Refund

On June 15, 2023, the Utility filed a WGSC application with the CPUC requesting cost recovery of approximately $2.5 billion of recorded expenditures related to wildfire mitigation costs and gas safety and electric modernization costs.

The recorded expenditures for wildfire mitigation consist of $726 million in expenses and $1.5 billion in capital expenditures and cover activities during the years 2020 to 2022. The recorded expenditures for gas safety and electric modernization consist of $120 million in expenses and $118 million in capital expenditures and cover activities during the years 2017 to 2022. If approved, the requested cost recovery would result in an aggregate revenue requirement of $688 million. The costs addressed in the WGSC application are incremental to those previously authorized in the Utility’s 2020 GRC and other proceedings.

On March 7, 2024, the CPUC approved a final decision authorizing the Utility to recover $516 million in interim rates to be recovered over at least 12 months starting April 1, 2024. The remaining $172 million will be recovered to the extent it is approved after the CPUC issues a final decision. Cost recovery requested in this application is subject to the CPUC’s reasonableness review, which could result in some or all of the interim rate relief being subject to refund.
Other Matters

PG&E Corporation and the Utility are subject to various claims and lawsuits that separately are not considered material.  Accruals for contingencies related to such matters totaled $78 million and $74 million as of March 31, 2025 and December 31, 2024, respectively. These amounts were included in Other current liabilities on the Condensed Consolidated Financial Statements. Included among these claims and lawsuits are the proofs of claim filed in the Chapter 11 Cases, except for proofs of claim discussed under “Wildfire-Related Securities Claims—Claims in the Bankruptcy Court Process” in Note 10 above. PG&E Corporation and the Utility have resolved a significant majority of the proofs of claim. PG&E Corporation and the Utility continue their review and analysis of certain remaining claims. PG&E Corporation and the Utility do not believe it is reasonably possible that the resolution of these matters will have a material impact on their financial condition, results of operations, or cash flows.
Tax Matters

PG&E Corporation’s tax returns have been accepted through 2015 for federal income tax purposes. The Internal Revenue Service (“IRS”) is auditing PG&E Corporation’s tax returns for 2015 through 2018. The most significant unresolved matter relates to the deductibility of approximately $850 million in costs for San Bruno related safety spend, which the CPUC did not allow the Utility to recover through rates, and $400 million in customer bill credits. PG&E Corporation records an income tax benefit related to a deduction for an uncertain tax position when it determines it is more likely than not that the uncertain tax position will ultimately be sustained. On June 4, 2024, the Office of Chief Counsel of the IRS issued a technical advice memorandum taking the position that the costs the Utility incurred for San Bruno related to safety spend and customer bill credits are nondeductible fines or penalties. As a result, in the year ended December 31, 2024, PG&E Corporation determined that it is no longer more likely than not that its deduction related to a portion of the customer bill credits would ultimately be sustained. Accordingly, PG&E Corporation has decreased its Income tax benefit by $70 million in the year ended December 31, 2024 related to state and federal income taxes. PG&E Corporation intends to defend itself vigorously as to all costs in this matter.
Environmental Remediation Contingencies

Given the complexities of the legal and regulatory environment and the inherent uncertainties involved in the early stages of a remediation project, the process for estimating remediation liabilities requires significant judgment. The Utility records an environmental remediation liability when the site assessments indicate that remediation is probable, and the Utility can reasonably estimate the loss or a range of probable amounts. The Utility records an environmental remediation liability based on the lower end of the range of estimated probable costs, unless an amount within the range is a better estimate than any other amount. Key factors that inform the development of estimated costs include site feasibility studies and investigations, applicable remediation actions, operations and maintenance activities, post-remediation monitoring, and the cost of technologies that are expected to be approved to remediate the site. Amounts recorded are not discounted to their present value. The Utility’s environmental remediation liability is primarily included in Noncurrent liabilities on the Condensed Consolidated Balance Sheets and is comprised of the following:
 Balance at
(in millions)March 31, 2025December 31, 2024
Topock natural gas compressor station$329 $294 
Hinkley natural gas compressor station97 97 
Former MGP sites owned by the Utility or third parties (1)
770 782 
Utility-owned generation facilities (other than fossil fuel-fired), other facilities, and third-party disposal sites (2)
75 76 
Fossil fuel-fired generation facilities and sites (3)
18 18 
Total environmental remediation liability$1,289 $1,267 
(1) Primarily driven by the following sites: San Francisco Beach Street, Napa, and San Francisco East Harbor.
(2) Primarily driven by Geothermal Landfill and Shell Pond site.
(3) Primarily driven by the San Francisco Potrero Power Plant.

The Utility’s gas compressor stations, former MGP sites, power plant sites, gas gathering sites, and sites used by the Utility for the storage, recycling, and disposal of potentially hazardous substances are subject to requirements issued by the United States Environmental Protection Agency under the Federal Resource Conservation and Recovery Act in addition to other state laws relating to hazardous substances.  The Utility has a comprehensive program to comply with federal, state, and local laws and regulations related to hazardous materials, waste, remediation activities, and other environmental requirements.  The Utility assesses and monitors the environmental requirements on an ongoing basis and implements changes to its program as deemed appropriate. The Utility’s remediation activities are overseen by the California Environmental Protection Agency, Department of Toxic Substances Control (“DTSC”), several California regional water quality control boards, and various other federal, state, and local agencies.

The Utility’s environmental remediation liability as of March 31, 2025, reflects its best estimate of probable future costs for remediation based on the current assessment data and regulatory obligations. Future costs will depend on many factors, including the extent of work necessary to implement final remediation plans, the Utility’s time frame for remediation, and unanticipated claims filed against the Utility.  The Utility may incur actual costs in the future that are materially different than this estimate and such costs could have a material impact on results of operations, financial condition, and cash flows during the period in which they are recorded. As of March 31, 2025, the Utility expected to recover $1.1 billion of its environmental remediation liability for certain sites through various ratemaking mechanisms authorized by the CPUC.
Natural Gas Compressor Station Sites

The Utility is legally responsible for remediating groundwater contamination caused by hexavalent chromium used in the past at the Utility’s natural gas compressor stations. The Utility is also required to take measures to abate the effects of the contamination on the environment.

Topock Site

The Utility’s remediation and abatement efforts at the Topock site are subject to the regulatory authority of the DTSC and the U.S. Department of the Interior. On April 24, 2018, the DTSC authorized the Utility to build an in-situ groundwater treatment system to convert hexavalent chromium into a non-toxic and non-soluble form of chromium. Construction activities began in October 2018, and the initial phase of construction was completed in 2021. Additional phases of construction will continue for several years. It is reasonably possible that the Utility’s undiscounted future costs associated with the Topock site may increase by as much as $220 million if the extent of contamination or necessary remediation is greater than anticipated. The costs associated with environmental remediation at the Topock site are expected to be recovered primarily through the HSMA, where 90% of the costs are recovered through rates.

Hinkley Site

The Utility’s remediation and abatement efforts at the Hinkley site are subject to the regulatory authority of the California Regional Water Quality Control Board, Lahontan Region. In November 2015, the California Regional Water Quality Control Board, Lahontan Region adopted a clean-up and abatement order directing the Utility to contain and remediate the underground plume of hexavalent chromium and the potential environmental impacts. The final order states that the Utility must continue and improve its remediation efforts, define the boundaries of the chromium plume, and take action to meet interim cleanup targets. It is reasonably possible that the Utility’s undiscounted future costs associated with the Hinkley site may increase by as much as $123 million if the extent of contamination or necessary remediation is greater than anticipated. The costs associated with environmental remediation at the Hinkley site will not be recovered through rates.

Former Manufactured Gas Plants

Former MGPs used coal and oil to produce gas for use by the Utility’s customers before natural gas became available. The by-products and residues of this process were often disposed of at the MGPs themselves. The Utility has a program to manage the residues left behind as a result of the manufacturing process; many of the sites in the program have been addressed. It is reasonably possible that the Utility’s undiscounted future costs associated with MGP sites may increase by as much as $618 million if the extent of contamination or necessary remediation at identified MGP sites is greater than anticipated. The costs associated with environmental remediation at the MGP sites are recovered through the HSMA, where 90% of the costs are recovered through rates.

Utility-Owned Generation Facilities and Third-Party Disposal Sites

Utility-owned generation facilities and third-party disposal sites often involve long-term remediation. It is reasonably possible that the Utility’s undiscounted future costs associated with Utility-owned generation facilities and third-party disposal sites may increase by as much as $78 million if the extent of contamination or necessary remediation is greater than anticipated. The environmental remediation costs associated with the Utility-owned generation facilities and third-party disposal sites are recovered through the HSMA, where 90% of the costs are recovered through rates.

Fossil Fuel-Fired Generation Sites

In 1998, the Utility divested its generation power plant business as part of generation deregulation. Although the Utility sold its fossil-fueled power plants, the Utility retained the environmental remediation liability associated with each site. It is reasonably possible that the Utility’s undiscounted future costs associated with fossil fuel-fired generation sites may increase by as much as $15 million if the extent of contamination or necessary remediation is greater than anticipated. The environmental remediation costs associated with the fossil fuel-fired sites will not be recovered through rates.
Nuclear Insurance

The Utility maintains multiple insurance policies through NEIL and EMANI, covering nuclear or non-nuclear events at the Utility’s two nuclear generating units at DCPP and the Humboldt Bay independent spent fuel storage installation.
NEIL provides insurance coverage for property damages and business interruption losses incurred by the Utility if a nuclear or non-nuclear event were to occur at the Utility’s two nuclear generating units at DCPP. NEIL provides property damage and business interruption coverage of up to $3.2 billion per nuclear incident and $2.5 billion per non-nuclear incident for DCPP. For the Humboldt Bay independent spent fuel storage installation, NEIL provides up to $50 million of coverage for nuclear and non-nuclear property damages. NEIL also provides coverage for damages caused by acts of terrorism and cyberattacks at nuclear power plants. Through NEIL, there is up to $3.2 billion available to the membership to cover this exposure. These coverage amounts are shared by all NEIL members and all nuclear and non-nuclear property insurance policies issued by NEIL. EMANI shares losses with NEIL, as part of the first $400 million of coverage within the current nuclear insurance program. EMANI also provides an additional $200 million in excess insurance for property damage and business interruption losses incurred by the Utility if a nuclear or non-nuclear event were to occur at DCPP. If NEIL losses in any policy year exceed accumulated funds, the Utility could be subject to a retrospective assessment.  If NEIL were to exercise this assessment, the maximum aggregate annual retrospective premium obligation for the Utility would be approximately $43 million.  For more information about the Utility’s nuclear insurance coverage, see Note 15 of the Notes to the Consolidated Financial Statements in Item 8 of the 2024 Form 10-K.
Purchase Commitments

In the ordinary course of business, the Utility enters into various agreements to purchase power and electric capacity; natural gas supply, transportation, and storage; nuclear fuel supply and services; and various other commitments. As of December 31, 2024, the Utility had undiscounted future expected obligations of approximately $33 billion. See Note 15 of the Notes to the Consolidated Financial Statements in Item 8 of the 2024 Form 10-K.
Oakland Headquarters Lease and Purchase

On October 23, 2020, the Utility and BA2 300 Lakeside LLC (“Landlord”), a wholly owned subsidiary of TMG Bay Area Investments II, LLC, entered into an office lease agreement for approximately 910,000 rentable square feet of space within the Lakeside Building to serve as the Utility’s principal administrative headquarters (the “Lease”).

On July 11, 2023, the Utility and the Landlord entered into an Amendment to Office Lease and an Agreement of Purchase and Sale and Joint Escrow Instructions, pursuant to which the Utility was deemed to have exercised its option to purchase the legal parcel that contains the Lakeside Building (the “Property”), as modified. Pursuant to the Agreement of Purchase and Sale and Joint Escrow Instructions, the purchase price of the Property will be $906 million, with deposits applicable to such purchase price of $150 million paid by July 11, 2023, $250 million paid by July 11, 2024, and the remaining $506 million to be paid at closing on or before June 3, 2025. The Utility will also receive a credit of approximately $172 million towards the final payment, subject to adjustments, which represents the estimated outstanding principal balance of a loan carried by the Property that will be assigned to, and assumed by, the Utility at closing. The Utility will continue to lease the Property pursuant to the Lease, as amended, until closing.

The Lease also requires the rentable space to be delivered in two phases, with each phase consisting of multiple subphases. As of March 31, 2025, approximately 715,000 rentable square feet of the leased premises has been made available for use by the Utility.

As of March 31, 2025, the Utility has recorded $807 million in Financing lease ROU assets, $264 million in accumulated amortization, $110 million in leasehold improvements, net of accumulated amortization, which includes $25 million that was provided to the Utility as lease incentives, and $568 million in current Financing lease liabilities in the Condensed Consolidated Financial Statements primarily related to the Lease, as amended.

For more information about the Lease, see “The Lakeside Buildingin Note 2 above.