WILDFIRE-RELATED CONTINGENCIES
3 Months Ended
Mar. 31, 2020
Commitments and Contingencies Disclosure [Abstract]  
WILDFIRE-RELATED CONTINGENCIES WILDFIRE-RELATED CONTINGENCIESPG&E Corporation and the Utility have significant contingencies arising from their operations, including contingencies related to wildfires. A provision for a loss contingency is recorded when it is both probable that a liability has been incurred and the amount of the liability can be reasonably estimated. PG&E Corporation and the Utility evaluate which potential liabilities are probable and the related range of reasonably estimated losses and record a charge that reflects their best estimate or the lower end of the range, if there is no better estimate. The assessment of whether a loss is probable or reasonably possible, and whether the loss or a range of losses is estimable, often involves a series of complex judgments about future events. Loss contingencies are reviewed quarterly, and estimates are adjusted to reflect the impact of all known information, such as negotiations, discovery, settlements and payments, rulings, advice of legal counsel, and other information and events pertaining to a particular matter. PG&E Corporation’s and the Utility’s provision for loss and expense excludes anticipated legal costs, which are expensed as incurred. PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows may be materially affected by the outcome of the following matters.
Pre-petition Wildfire-Related Claims

Pre-petition wildfire-related claims on the Condensed Consolidated Financial Statements include amounts associated with the 2018 Camp fire, the 2017 Northern California wildfires, and the 2015 Butte fire.

At March 31, 2020 and December 31, 2019, the Utility’s Consolidated Balance Sheets include estimated liabilities in respect of total wildfire-related claims of $25.5 billion. The aggregate liability of $25.5 billion for claims in connection with the 2018 Camp fire, the 2017 Northern California wildfires, and the 2015 Butte fire is comprised of (i) $11 billion for subrogated insurance claimholders pursuant to the Subrogation RSA, plus (ii) $47.5 million for expected professional fees for professionals retained by subrogated insurance claimholders to be reimbursed pursuant to the Subrogation RSA, plus (iii) $1 billion for the Supporting Public Entities with respect to their Public Entity Wildfire Claims pursuant to the PSAs, plus (iv) $13.5 billion for all other wildfire-related claims, including individual wildfire claimholders (including those with uninsured and underinsured property losses) and clean-up and fire suppression costs, pursuant to the TCC RSA. The aggregate liability of $25.5 billion for claims in connection with the 2018 Camp fire, the 2017 Northern California wildfires and the 2015 Butte fire corresponds PG&E Corporation’s and the Utility’s best estimate of probable losses and is subject to change based on additional information, including the other factors discussed below. (See “2018 Camp Fire, 2017 Northern California Wildfires and 2015 Butte Fire Accounting Charge” below.)

On the Petition Date, all wildfire-related claims were classified as LSTC and all pending litigation was stayed.

In addition, the Utility incurred legal and other costs of $34 million and $47 million related to the 2018 Camp fire, the 2017 Northern California wildfires and the 2015 Butte fire during the quarters ended March 31, 2020 and 2019, respectively.

2018 Camp Fire Background

According to Cal Fire, on November 8, 2018 at approximately 6:33 a.m., a wildfire began near the city of Paradise, Butte County, California (the “2018 Camp fire”), which is located in the Utility’s service territory. Cal Fire’s Camp Fire Incident Information Website as of November 15, 2019 (the “Cal Fire website”) indicated that the 2018 Camp fire consumed 153,336 acres. On the Cal Fire website, Cal Fire reported 85 fatalities and the destruction of 18,804 structures resulting from the 2018 Camp fire.

On May 15, 2019, Cal Fire issued a news release announcing the results of its investigation into the cause of the 2018 Camp fire. According to the news release:

Cal Fire determined that the 2018 Camp fire was caused by electrical transmission lines owned and operated by the Utility near Pulga, California.

Cal Fire identified a second ignition site and stated that the second fire was consumed by the original fire which started earlier near Pulga, California. Cal Fire stated that the cause of the second fire was determined to be “vegetation into electrical distribution lines owned and operated by” the Utility.

As described under the heading “District Attorneys’ Offices’ Investigations” below, the 2018 Camp fire was the subject of a criminal investigation, which has been settled, as to PG&E Corporation and the Utility, by the parties, subject to court approvals from the Bankruptcy Court, which was granted as of April 14, 2020, and the Butte County Superior Court, currently scheduled to occur on or about May 26, 2020. As of the date of this filing, Cal Fire’s investigation report has not been shared with PG&E Corporation or the Utility.

PG&E Corporation and the Utility have accepted Cal Fire’s determination that the 2018 Camp fire ignited at the first ignition site. PG&E Corporation and the Utility have not been able to form a conclusion as to whether a second fire ignited as a result of vegetation contact with the Utility’s facilities.

PG&E Corporation and the Utility have not yet had access to all of the evidence collected by Cal Fire as part of its investigation or to the investigation report prepared by Cal Fire.
Further, the CPUC’s SED also conducted investigations into whether the Utility committed civil violations in connection with the 2018 Camp fire. On November 26, 2019, the SED concluded its investigation into the 2018 Camp fire and released a report alleging certain violations of state law and CPUC regulations. See “Order Instituting an Investigation into the 2017 Northern California Wildfires and the 2018 Camp Fire” in Note 11 for a description of these proceedings, including the alleged violations in connection with the 2018 Camp fire.

2017 Northern California Wildfires Background

Beginning on October 8, 2017, multiple wildfires spread through Northern California, including Napa, Sonoma, Butte, Humboldt, Mendocino, Lake, Nevada, and Yuba Counties, as well as in the area surrounding Yuba City (the “2017 Northern California wildfires”). According to the Cal Fire California Statewide Fire Summary dated October 30, 2017, at the peak of the 2017 Northern California wildfires, there were 21 major fires that, in total, burned over 245,000 acres and destroyed an estimated 8,900 structures. The 2017 Northern California wildfires resulted in 44 fatalities.

Cal Fire has investigated the causes of the 2017 Northern California wildfires and made the following determinations:

the Utility’s equipment was involved in causing 20 wildfires (the La Porte, McCourtney, Lobo, Honey, Redwood, Sulphur, Cherokee, 37, Blue, Norrbom, Adobe, Partrick, Pythian, Nuns, Pocket, Atlas, Cascade, Pressley, Point and Youngs fires); and

the Tubbs fire was caused by a private electrical system adjacent to a residential structure.

As described under the heading “District Attorney’s Offices’ Investigations” below, certain of the 2017 Northern California wildfires were the subject of criminal investigations, which have been settled or resulted in PG&E Corporation and the Utility being informed by the applicable district attorney’s office of a decision not to prosecute.

The SED also conducted investigations into whether the Utility committed civil violations in connection with the 2017 Northern California wildfires. See “Order Instituting an Investigation into the 2017 Northern California Wildfires and the 2018 Camp Fire” in Note 11 for a description of these proceedings, including the alleged violations in connection with the 2017 Northern California wildfires.

Third-Party Claims, Investigations and Other Proceedings Related to the 2018 Camp Fire and 2017 Northern California Wildfires

If the Utility’s facilities, such as its electric distribution and transmission lines, are determined to be the substantial cause of one or more fires, and the doctrine of inverse condemnation applies, the Utility could be liable for property damage, business interruption, interest and attorneys’ fees without having been found negligent. California courts have imposed liability under the doctrine of inverse condemnation in legal actions brought by property holders against utilities on the grounds that losses borne by the person whose property was damaged through a public use undertaking should be spread across the community that benefited from such undertaking, and based on the assumption that utilities have the ability to recover these costs from their customers. Further, California courts have determined that the doctrine of inverse condemnation is applicable regardless of whether the CPUC ultimately allows recovery by the utility for any such costs. The CPUC may decide not to authorize cost recovery even if a court decision were to determine that the Utility is liable as a result of the application of the doctrine of inverse condemnation. (See “Loss Recoveries – Regulatory Recovery” below for further information regarding potential cost recovery related to the wildfires, including in connection with SB 901.)

On October 25, 2019, PG&E Corporation and the Utility submitted a brief to the Bankruptcy Court challenging the application of inverse condemnation to California’s investor-owned utilities, including the Utility. The Bankruptcy Court heard argument regarding PG&E Corporation’s and the Utility’s motion on November 19, 2019. On December 3, 2019, the Bankruptcy Court entered an order holding that the doctrine of inverse condemnation applied to California’s investor-owned utilities, including the Utility, and certifying the decision for direct appeal to the U.S. Court of Appeals for the Ninth Circuit. PG&E Corporation and the Utility have appealed this decision; however, as of the date of this filing, this appeal was stayed upon request of PG&E Corporation and the Utility due to, among other things, the settlement of fire claims embodied in the Public Entity PSA’s, TCC RSA and Subrogation RSA.

In addition to claims for property damage, business interruption, interest and attorneys’ fees, the Utility could be liable for fire suppression costs, evacuation costs, medical expenses, personal injury damages, punitive damages and other damages under other theories of liability, including if the Utility were found to have been negligent.
Further, the Utility could be subject to material fines, penalties, or restitution orders if the CPUC or any law enforcement agency were to bring an enforcement action, including, if the Plea Agreement is terminated, a criminal proceeding, and it were determined that the Utility had failed to comply with applicable laws and regulations.

As of January 28, 2019, before the automatic stay arising as a result of the filing of the Chapter 11 Cases, PG&E Corporation and the Utility were aware of approximately 100 complaints on behalf of at least 4,200 plaintiffs related to the 2018 Camp fire, nine of which sought to be certified as class actions. The pending civil litigation against PG&E Corporation and the Utility related to the 2018 Camp fire, which is currently stayed as a result of the commencement of the Chapter 11 Cases, included claims under multiple theories of liability, including, but not limited to, inverse condemnation, trespass, private nuisance, public nuisance, negligence, negligence per se, negligent interference with prospective economic advantage, negligent infliction of emotional distress, premises liability, violations of the Public Utilities Code, violations of the Health & Safety Code, malice and false advertising in violation of the California Business and Professions Code. The plaintiffs principally asserted that PG&E Corporation’s and the Utility’s alleged failure to maintain and repair their distribution and transmission lines and failure to properly maintain the vegetation surrounding such lines were the causes of the 2018 Camp fire. The plaintiffs sought damages and remedies that include wrongful death, personal injury, property damage, evacuation costs, medical expenses, establishment of a class action medical monitoring fund, punitive damages, attorneys’ fees and other damages.

As of January 28, 2019, before the automatic stay arising as a result of the filing of the Chapter 11 Cases, PG&E Corporation and the Utility were aware of approximately 750 complaints on behalf of at least 3,800 plaintiffs related to the 2017 Northern California wildfires, five of which sought to be certified as class actions. These cases were coordinated in the San Francisco County Superior Court. As of the Petition Date, the coordinated litigation was in the early stages of discovery. A trial with respect to the Atlas fire was scheduled to begin on September 23, 2019. The pending civil litigation against PG&E Corporation and the Utility related to the 2017 Northern California wildfires included claims under multiple theories of liability, including, but not limited to, inverse condemnation, trespass, private nuisance and negligence. This litigation, including the trial date with respect to the Atlas fire, currently is stayed as a result of the commencement of the Chapter 11 Cases. The plaintiffs principally asserted that PG&E Corporation’s and the Utility’s alleged failure to maintain and repair their distribution and transmission lines and failure to properly maintain the vegetation surrounding such lines were the causes of the 2017 Northern California wildfires. The plaintiffs sought damages and remedies that include wrongful death, personal injury, property damage, evacuation costs, medical expenses, punitive damages, attorneys’ fees and other damages.

As described below under the heading “Restructuring Support Agreement with the TCC,” on December 6, 2019, PG&E Corporation and the Utility entered into a RSA with the TCC, the Consenting Fire Claimant Professionals and the Shareholder Proponents to potentially resolve all wildfire-related claims relating to the 2017 Northern California wildfires and the 2018 Camp fire (other than subrogated insurance claims and Public Entity Wildfire Claims) through the Chapter 11 process. On December 19, 2019, the Bankruptcy Court entered an order approving the TCC RSA.

Insurance carriers who have made payments to their insureds for property damage arising out of the 2017 Northern California wildfires filed 52 subrogation complaints in the San Francisco County Superior Court and the Sonoma County Superior Court as of January 28, 2019. These complaints allege, among other things, negligence, inverse condemnation, trespass and nuisance. The allegations are similar to the ones made by individual plaintiffs. As of January 28, 2019, before the automatic stay arising as a result of the filing of the Chapter 11 Cases, insurance carriers filed 39 similar subrogation complaints with respect to the 2018 Camp fire in the Sacramento County Superior Court and the Butte County Superior Court. As described below under the heading “Restructuring Support Agreement with Holders of Subrogation Claims,” on September 22, 2019, PG&E Corporation and the Utility entered into a RSA with certain holders of insurance subrogation claims to potentially resolve all insurance subrogation claims relating to the 2017 Northern California wildfires and the 2018 Camp fire through the Chapter 11 process. On December 19, 2019, the Bankruptcy Court entered an order approving the Subrogation RSA.

Various government entities, including Yuba, Nevada, Lake, Mendocino, Napa and Sonoma Counties and the Cities of Santa Rosa and Clearlake, also asserted claims against PG&E Corporation and the Utility based on the damages that these government entities allegedly suffered as a result of the 2017 Northern California wildfires. Such alleged damages included, among other things, loss of natural resources, loss of public parks, property damages and fire suppression costs. The causes of action and allegations are similar to the ones made by individual plaintiffs and the insurance carriers. With respect to the 2018 Camp fire, Butte County has filed similar claims against PG&E Corporation and the Utility. As described below under the heading “Plan Support Agreements with Public Entities,” on June 18, 2019, PG&E Corporation and the Utility entered into agreements with certain government entities to potentially resolve their wildfire-related claims through the Chapter 11 process. The PSAs do not require Bankruptcy Court approval to be effective; however, the Bankruptcy Court must ultimately approve the Plan that incorporates the terms of the PSAs.
FEMA has filed proofs of claim in the Chapter 11 Cases in the amount of $1.2 billion in connection with the 2017 Northern California wildfires and $2.6 billion in connection with the 2018 Camp fire. FEMA has objected to the classification of their claims under the Plan as Fire Victim Claims and has indicated that it intends to seek to have its claims classified separately from the Fire Victim Claims. In addition, Cal Fire has filed proofs of claim in the Chapter 11 Cases in the amount of $133 million in connection with the 2017 Northern California wildfires and specifying at least $110 million in connection with the 2018 Camp fire. The OES has filed proofs of claim in the amount of $347 million in connection with the 2017 Northern California wildfires and $2.3 billion in connection with the 2018 Camp fire. The California Department of Transportation has filed proofs of claim in the Chapter 11 Cases in the amount of $217 million in connection with the 2018 Camp fire.

Certain other Federal, state and local entities (that are not Supporting Public Entities) have filed proofs of claim in the Chapter 11 Cases in connection with the 2017 Northern California wildfires and the 2018 Camp fire asserting total claims in the amount of $503 million. Proofs of claim have also been filed for unspecified amounts to be determined at a later time. On December 12, 2019, the TCC filed an objection to the claims filed by OES in which it argued that the Bankruptcy Court should disallow the OES claims. On January 9, 2020, the TCC filed a supplement to its objection in which it also objected to the claims filed by FEMA. On February 5, 2020, PG&E Corporation and the Utility joined in the TCC’s objection to the OES and FEMA claims. On February 12, 2020, a number of individuals and businesses who hold wildfire-related claims in connection with the 2015 Butte fire, 2017 Northern California wildfires and 2018 Camp fire, as well as certain preference plaintiffs (the “Tubbs Preference Plaintiffs”), joined in the TCC’s objection to the OES and FEMA claims. Also on February 12, 2020, OES and FEMA filed oppositions to the TCC’s objection. On February 26, 2020, the Bankruptcy Court heard argument over the TCC’s and PG&E Corporation’s and the Utility’s legal objections to claims filed by FEMA and Cal OES. On February 27, 2020, the TCC, the Consenting Fire Claimant Professionals (as defined in the Plan), FEMA and certain other federal agencies, the OES and certain other state agencies, the Debtors, and the Shareholder Proponents participated in a mediation in San Francisco, California in an effort to resolve the aforementioned claims.

On April 21, 2020, the parties announced that settlement agreements had been reached with certain Federal agencies (including FEMA and the United States Small Business Administration (the “SBA”)) and certain State agencies (including Cal OES and Cal Fire) regarding their claims filed against PG&E Corporation or the Utility in the Chapter 11 Cases which constitute “Fire Claims” (as defined in the Plan). Pursuant to the terms of the settlement agreements, the Fire Claims of FEMA and the SBA will be allowed at $1 billion, channeled to the Fire Victim Trust, and fully subordinated and junior in right of payment to the prior payment in full of all other Fire Victim Claims from the Fire Victim Trust; $117 million will be paid to the DOJ in full and final satisfaction and discharge of the Fire Claims of certain other Federal agencies and payable solely from the proceeds of the “Assigned Rights and Causes of Action” (as defined in the Plan), after the payment of professional fees and costs incurred in connection with the prosecution of such Assigned Rights and Causes of Action; Cal OES’s Fire Claims will be withdrawn with prejudice; Cal Fire’s Fire Claims will be allowed at $115.3 million, payable over a period of years by the Fire Victim Trust, with the first $70 million payable solely and exclusively from any cash interest earned on the cash holdings of the Fire Victim Trust after the Effective Date and the remaining $45.3 million payable solely and exclusively from such cash interest less the expenses of administering the Fire Victim Trust in such years; the Fire Claims of certain other State agencies will be allowed at $89 million, payable by the Fire Victim Trust over a period of years, with the first $60 million payable solely and exclusively from proceeds of the monetization of the PG&E Corporation common stock in excess of $6.75 billion in accordance with an agreed-upon formula and available cash interest after expenses and after the Cal Fire Settlement Amount (as defined below) has been paid in full, and the balance payable solely and exclusively from such monetization proceeds and interest earned on the cash holdings of the Fire Victim Trust (less expenses of administering the Fire Victim Trust); and the holders of the above claims that are being settled and channeled to the Fire Victim Trust, consistent with the Plan, will have no right of recovery from PG&E Corporation or the Utility. Consistent with the Plan and the agreements, the obligations of payment relating to the agreements are solely the responsibility of the Fire Victim Trust, and PG&E Corporation and the Utility will have no further obligations with respect to the claims that are the subject of the agreements. PG&E Corporation and the Utility filed a motion seeking Bankruptcy Court approval of the agreements on April 26, 2020. A hearing before the Bankruptcy Court to consider approval of the agreements is currently scheduled for May 12, 2020.

As described in Note 2, on July 1, 2019, the Bankruptcy Court entered an order approving the Bar Date of October 21, 2019, at 5:00 p.m. (Pacific Time) for filing claims against PG&E Corporation and the Utility relating to the period prior to the Petition Date, including claims in connection with the 2018 Camp fire and the 2017 Northern California wildfires. On November 11, 2019, the Bankruptcy Court entered an order approving a stipulation between PG&E Corporation and the Utility and the TCC to extend the Bar Date for unfiled, non-governmental fire claimants to December 31, 2019, at 5:00 p.m. (Pacific Time). See “Potential Claims” in Note 2 above.
Regardless of any determinations of cause by Cal Fire with respect to any pre-petition fire, ultimately PG&E Corporation’s and the Utility’s liability will be determined through the Chapter 11 process (including the settlement agreements described below), regulatory proceedings and any potential enforcement proceedings. The timing and outcome of these and other potential proceedings are uncertain.

Proceeding in San Francisco County Superior Court for Certain Tubbs Fire-Related Claims (the “Tubbs Trial”)

In connection with the TCC RSA, on December 26, 2019, the San Francisco Superior Court entered an order vacating all dates and deadlines in the Tubbs Trial and scheduled a hearing for March 2, 2020 to show cause regarding dismissal of the Tubbs Trial. On February 28, 2020, at the request of the Plaintiffs, the Court continued the hearing on the order to show cause to July 27, 2020.

On January 6, 2020, in accordance with the terms of the TCC RSA, PG&E Corporation and the Utility filed a motion with the Bankruptcy Court seeking authority to enter into settlement agreements settling and liquidating the claims asserted against PG&E Corporation and the Utility by each of the Tubbs Preference Plaintiffs. On January 30, 2020, the Bankruptcy Court issued an order granting PG&E Corporation and the Utility’s motion to enter into settlement agreements with each of the Tubbs Preference Plaintiffs (the “Tubbs Preference Settlements”). The Tubbs Preference Settlements will be channeled through the Fire Victim Trust.

Wildfire Claims Estimation Proceeding in the U.S. District Court for the Northern District of California (the “Estimation Proceeding”)

On July 18, 2019, PG&E Corporation and the Utility filed a motion with the Bankruptcy Court for entry of an order establishing procedures and schedules for the estimation of PG&E Corporation’s and the Utility’s aggregate liability for certain claims arising out of the 2018 Camp fire, the 2017 Northern California wildfires and the 2015 Butte fire.

On August 21, 2019, the Bankruptcy Court issued recommendations to the District Court recommending the District Court order the partial withdrawal of the reference of the section 502(c) estimation of unliquidated claims arising from the 2018 Camp fire and the 2017 Northern California wildfires. On August 23, 2019, the District Court issued an order adopting the recommendation of the Bankruptcy Court in full and ordering that the reference to the Bankruptcy Court be withdrawn in part.

On October 9, 2019, the District Court issued an initial order for the estimation hearings to begin on February 18, 2020 and conclude on February 28, 2020, with the possibility of an additional week of hearings if warranted.

In connection with the TCC RSA, on December 20, 2019, the District Court entered an order staying the Estimation Proceeding and vacating the February 18, 2020 hearing and all pre-hearing dates. Under section 502(c) and pursuant to the terms of the TCC RSA, PG&E Corporation and the Utility filed a motion in the District Court on March 20, 2020 requesting that the District Court estimate the aggregate liability of the Fire Victim Claims at $13.5 billion—the amount the parties agreed to in the TCC RSA. Certain parties, including the TCC, objected to the motion arguing, among things, that the District Court needs to clarify certain provisions of the TCC RSA. PG&E Corporation and the Utility filed a reply to the objection on April 10, 2020, and the District Court held a status conference on April 16, 2020. The next status conference is set for May 18, 2020. A hearing on the motion is set for May 21, 2020.

Plan Support Agreements with Public Entities

On June 18, 2019, PG&E Corporation and the Utility entered into PSAs with certain local public entities (collectively, the “Supporting Public Entities”) providing for an aggregate of $1.0 billion to be paid by PG&E Corporation and the Utility to such public entities pursuant to the Plan in order to settle such public entities’ claims against PG&E Corporation and the Utility relating to the 2018 Camp fire, 2017 Northern California wildfires and 2015 Butte fire (collectively, “Public Entity Wildfire Claims”). PG&E Corporation and the Utility have entered into a PSA with each of the following public entities or groups of public entities, as applicable:

the City of Clearlake, the City of Napa, the City of Santa Rosa, the County of Lake, the Lake County Sanitation District, the County of Mendocino, Napa County, the County of Nevada, the County of Sonoma, the Sonoma County Agricultural Preservation and Open Space District, the Sonoma County Community Development Commission, the Sonoma County Water Agency, the Sonoma Valley County Sanitation District and the County of Yuba (collectively, the “2017 Northern California Wildfire Public Entities”);
the Town of Paradise;

the County of Butte;

the Paradise Recreation & Park District;

the County of Yuba; and

the Calaveras County Water District.

For purposes of each PSA, the local public entities that are party to such PSA are referred to herein as “Supporting Public Entities.”

Each PSA provides that the Plan will include, among other things, the following elements:

following the effective date of the Plan, PG&E Corporation and the Utility will remit a Settlement Amount (as defined below) in the amount set forth below to the applicable Supporting Public Entities in full and final satisfaction and discharge of their Public Entity Wildfire Claims, and

subject to the Supporting Public Entities voting affirmatively to accept the Plan, following the effective date of the Plan, PG&E Corporation and the Utility will create and promptly fund $10.0 million to a segregated fund to be used by the Supporting Public Entities collectively in connection with the defense or resolution of claims against the Supporting Public Entities by third parties relating to the wildfires noted above (“Third Party Claims”).

The “Settlement Amount” set forth in each PSA is as follows:

for the 2017 Northern California Wildfire Public Entities, $415.0 million (which amount will be allocated among such entities),

for the Town of Paradise, $270.0 million,

for the County of Butte, $252.0 million,

for the Paradise Recreation & Park District, $47.5 million,

for the County of Yuba, $12.5 million, and

for the Calaveras County Water District, $3.0 million.

Each PSA provides that, subject to certain terms and conditions, the Supporting Public Entities will support the Plan with respect to its treatment of their respective Public Entity Wildfire Claims, including by voting to accept the Plan in the Chapter 11 Cases.

Each PSA may be terminated by the applicable Supporting Public Entities under certain circumstances, including:

if the Federal Emergency Management Agency or the OES fails to agree that no reimbursement is required from the Supporting Public Entities on account of assistance rendered by either agency in connection with the wildfires noted above, and

by any individual Supporting Public Entity, if a material amount of Third Party Claims is filed against such Supporting Public Entity and such Third Party Claims are not released pursuant to the Plan.

Each PSA may be terminated by PG&E Corporation and the Utility under certain circumstances, including if:

PG&E Corporation and the Utility do not obtain the consent, or the waiver of the lack of consent as a defense, of their insurance carriers for the policy years 2017 and 2018,

the Board of Directors of either PG&E Corporation or the Utility determines in good faith that continued performance under the PSA would be inconsistent with the exercise of its fiduciary duties, and
any Supporting Public Entity terminates a PSA, in which case PG&E Corporation and the Utility may terminate any other PSA.

Restructuring Support Agreement with Holders of Subrogation Claims

On September 22, 2019, PG&E Corporation and the Utility entered into the Subrogation RSA. The Subrogation RSA provides for an aggregate amount of $11.0 billion (the “Aggregate Subrogation Recovery”) to be paid by PG&E Corporation and the Utility pursuant to the Plan in order to settle the Subrogation Claims, upon the terms and conditions set forth in the Subrogation RSA. Under the Subrogation RSA, PG&E Corporation and the Utility have also agreed to reimburse the holders of Subrogation Claims for professional fees of up to $55 million, upon the terms and conditions set forth in the Subrogation RSA.

The Subrogation RSA provides that, subject to certain terms and conditions (including that PG&E Corporation and the Utility remain solvent), the Consenting Subrogation Creditors will support the Plan with respect to its treatment of the Subrogation Claims, including by voting their Subrogation Claims to accept the Plan in the Chapter 11 Cases.

On September 24, 2019, PG&E Corporation and the Utility filed a motion with the Bankruptcy Court seeking authority to enter into, and perform under, the Subrogation RSA and approving the terms of the settlement contemplated under the Subrogation RSA. On December 19, 2019, the Bankruptcy Court entered an order approving the Subrogation RSA.

The Subrogation RSA will automatically terminate if (i) the Plan is not confirmed by June 30, 2020 (or such later date as may be authorized by any amendment to AB 1054) or (ii) the Effective Date does not occur prior to December 31, 2020 (or six months following the deadline for confirmation of the Plan if such deadline is extended by any amendment to AB 1054).

The Subrogation RSA may be terminated by any Consenting Subrogation Creditor as to itself if the Aggregate Subrogation Recovery is modified. The Subrogation RSA may be terminated by the Consenting Subrogation Creditors holding at least two-thirds of the Subrogation Claims held by Consenting Subrogation Creditors under certain circumstances, including, among others, if (i) they reasonably determine in good faith at any time prior to confirmation of the Plan that PG&E Corporation and the Utility are insolvent or otherwise unable to raise sufficient capital to pay the Aggregate Subrogation Recovery on the Effective Date, (ii) PG&E Corporation and the Utility breach the terms of the Subrogation RSA or otherwise fail to take certain actions specified in the Subrogation RSA, (iii) the Plan does not treat the individual plaintiffs’ wildfire-related claims consistent with the provisions of AB 1054, (iv) the Bankruptcy Court allows a plan proponent other than PG&E Corporation and the Utility to commence soliciting votes on a plan (other than the Plan) that incorporates the terms of the settlement contemplated by the Subrogation RSA and PG&E Corporation and the Utility have not already commenced soliciting votes on the Plan which incorporates such settlement, (v) the Bankruptcy Court confirms a plan other than the Plan or (vi) the Plan is modified to be inconsistent with such settlement. The Subrogation RSA may be terminated by PG&E Corporation and the Utility (a) in the event of certain breaches of the Subrogation RSA by Consenting Subrogation Creditors holding at least 5% of the Subrogation Claims held by Consenting Subrogation Creditors or (b) if the Bankruptcy Court confirms a plan other than the Plan or if the terms of the Plan related to the settlement contemplated by the Subrogation RSA become unenforceable or are enjoined.

Subject to certain limited exceptions, the valuation of the Subrogation Claims in an aggregate amount of $11.0 billion (the “Allowed Subrogation Claim Amount”) will survive any termination of the Subrogation RSA and will be binding on PG&E Corporation and the Utility in the Chapter 11 Cases.
Restructuring Support Agreement with the TCC

On December 6, 2019, PG&E Corporation and the Utility entered into a Restructuring Support Agreement, which was subsequently amended on December 16, 2019, with the TCC, the Consenting Fire Claimant Professionals and the Shareholder Proponents (as amended, the “TCC RSA”). The TCC RSA provides for, among other things, an aggregate of $13.5 billion in value to be provided by PG&E Corporation and the Utility pursuant to the Plan (together with certain additional rights, the “Aggregate Fire Victim Consideration”) in order to settle and discharge the Fire Victim Claims, upon the terms and conditions set forth in the TCC RSA and the Plan. The Aggregate Fire Victim Consideration is to be funded into a trust (the “Fire Victim Trust”) to be established pursuant to the Plan for the benefit of holders of the Fire Victim Claims and will consist of (a) $5.4 billion in cash contributed on the effective date of the Plan, (b) $1.35 billion in cash comprising (i) $650 million paid in cash on or before January 15, 2021 and (ii) $700 million paid in cash on or before January 15, 2022, subject to the terms of a tax benefit payment agreement to be entered into between the Fire Victim Trust and the reorganized Utility, and (c) $6.75 billion in common stock of the reorganized PG&E Corporation valued at 14.9 times Normalized Estimated Net Income (as defined in the TCC RSA), except that the Fire Victim Trust’s share ownership of the reorganized PG&E Corporation will not be less than 20.9% based on the number of fully diluted shares of the reorganized PG&E Corporation outstanding as of the effective date of the Plan, assuming the Utility’s current allowed ROE. Under certain circumstances, including certain change of control transactions and in connection with the monetization of certain tax benefits related to the payment of wildfire-related claims, the payments described in (b) will be accelerated and payable upon an earlier date. The Aggregate Fire Victim Consideration also includes (1) the assignment by PG&E Corporation and the Utility to the Fire Victim Trust of certain rights and causes of action related to the 2015 Butte fire, the 2017 Northern California wildfires and the 2018 Camp fire (together, the “Fires”) that PG&E Corporation and the Utility may have against certain third parties and (2) the assignment of rights under the 2015 and 2016 insurance policies to resolve any claims related to the Fires in those policy years, other than the rights of PG&E Corporation and the Utility to be reimbursed under the 2015 insurance policies for claims submitted prior to the Petition Date.

Under the terms of the Plan, all Fire Victim Claims, including claims by uninsured and underinsured individual claimholders as well as government entities that are not Supporting Public Entities (including FEMA and OES/Cal Fire), would be settled and discharged in consideration of the payment of the Aggregate Fire Victim Consideration to the Fire Victim Trust. However, the TCC RSA is an agreement among PG&E Corporation and the Utility, the TCC, the Shareholder Proponents, and the Consenting Fire Claimant Professionals, which are attorneys representing individual claimholders. No individual claimholder is a party to the TCC RSA. Accordingly, there can be no assurance that such claimholders will support the Plan or the treatment of their Fire Victim Claims in the Chapter 11 Cases as provided in the Plan.

In addition, each party to the TCC RSA must, among other things, (a) use commercially reasonable efforts to support and cooperate with PG&E Corporation and the Utility to obtain confirmation of the Plan and any necessary regulatory or other approvals, and (b) oppose efforts and procedures to confirm the Ad Hoc Noteholder Plan. Each party to the TCC RSA also must not, among other things, (1) object to, delay, impede, or take any other action to interfere with acceptance, confirmation or implementation of the Plan or (2) propose, file or support any other plan of reorganization, restructuring, or sale of assets with respect to PG&E Corporation and the Utility. Each Consenting Fire Claimant Professional must use all reasonable efforts to advise and recommend to its existing and future clients (who hold Fire Victim Claims) to support and vote to accept the Plan and to opt-in to consensual releases under the Plan.

The TCC RSA will automatically terminate under certain circumstances, including, among others, if (a) a sufficient number of Fire Victim Claims votes to accept the Plan such that the class of Fire Victim Claims in the Plan votes to accept the Plan under 11 U.S.C. section 1126(c) as determined by the Bankruptcy Court are not made by the later of (i) the voting deadline for the Plan or (ii) June 30, 2020, (b) the disclosure statement for the Plan is not approved by the Bankruptcy Court by March 30, 2020 and a motion seeking approval of the settlement of the Estimation Proceeding for the Aggregate Fire Victim Consideration is not filed by March 30, 2020, (c) the Plan is not confirmed by the Bankruptcy Court by June 30, 2020, or (d) the effective date of the Plan does not occur prior to August 29, 2020 (which deadlines in (b) through (d) of this paragraph may be extended by consent of PG&E Corporation and the Utility, the TCC, the Shareholder Proponents and the Requisite Consenting Fire Claimant Professionals (as defined below)).
The TCC RSA may be terminated by the TCC or the Requisite Consenting Fire Claimant Professionals (consisting of (a) the TCC, acting by vote of simple majority of its members, and (b) a group of thirteen law firms (subject to addition) that are Consenting Fire Claimant Professionals and whose initial members are specified in the TCC RSA, acting by vote of a simple majority of its members) if (a) PG&E Corporation and the Utility or the Shareholder Proponents breach any of their obligations, representations, warranties or covenants set forth in the TCC RSA, (b) PG&E Corporation and the Utility and the Shareholder Proponents fail to prosecute the Plan and seek entry of a confirmation order that contains or is otherwise consistent with the terms of the TCC RSA, or propose, pursue or support a Chapter 11 plan of reorganization or confirmation order inconsistent with the terms of the TCC RSA or the Plan, (c) the Plan is or is modified to be inconsistent with the terms of the TCC RSA, or (d) the TCC or the Requisite Consenting Fire Claimant Professionals determine on or before the date of the Bankruptcy Court hearing to approve the TCC RSA that Section 4.19(f)(ii) of the Plan (and any related provisions) has not been modified to their satisfaction. The TCC RSA may be terminated by PG&E Corporation and the Utility or the Shareholder Proponents if (1) either the TCC or Consenting Fire Claimant Professionals that represent in the aggregate more than 8,000 holders of Fire Victim Claims breach any of their obligations, representations, warranties or covenants set forth in the TCC RSA or (2) if the TCC takes any action inconsistent with its obligations under the TCC RSA or fails to take any action required under the TCC RSA.

PG&E Corporation’s and the Utility’s obligation relating to the Tubbs Preference Settlements will survive any termination of the TCC RSA and will be enforceable against PG&E Corporation and the Utility. In addition, the TCC RSA provides that, upon termination of the TCC RSA, (a) the Estimation Proceeding will immediately recommence and (b) all litigation regarding the Tubbs fire, including a determination of whether or not the Utility caused the Tubbs fire, will be determined by the District Court without any reference to any state court proceeding. On December 19, 2019, the Bankruptcy Court entered an order approving the TCC RSA.

Pursuant to further discussions with claimants relating to the Ghost Ship fire, certain provisions of the TCC RSA were superseded by the terms of the Plan, and accordingly the above description of the TCC RSA has been revised to reflect the fact that claims arising out of the Ghost Ship fire will be resolved separately from the TCC RSA.

2015 Butte Fire

In September 2015, a wildfire (the “2015 Butte fire”) ignited and spread in Amador and Calaveras Counties in Northern California. Cal Fire concluded that the 2015 Butte fire was caused when a gray pine tree contacted the Utility’s electric line, which ignited portions of the tree, and determined that the failure by the Utility and/or its vegetation management contractors, ACRT Inc. and Trees, Inc., to identify certain potential hazards during its vegetation management program ultimately led to the failure of the tree.

Third-Party Claims

On May 23, 2016, individual plaintiffs filed a master complaint against the Utility and its two vegetation management contractors in the Superior Court of California, County of Sacramento.  Subrogation insurers also filed a separate master complaint on the same date.  The California Judicial Council previously had authorized the coordination of all cases in Sacramento County.  As of January 28, 2019, 95 known complaints were filed against the Utility and its two vegetation management contractors in the Superior Court of California in the Counties of Calaveras, San Francisco, Sacramento, and Amador.  The complaints involve approximately 3,900 individual plaintiffs representing approximately 2,000 households and their insurance companies.  These complaints were part of, or were in the process of being added to, the coordinated proceeding.  Plaintiffs sought to recover damages and other costs, principally based on the doctrine of inverse condemnation and negligence theory of liability.  Plaintiffs also sought punitive damages.  The Utility believes a loss related to punitive damages is unlikely, but possible. Several plaintiffs dismissed the Utility’s two vegetation management contractors from their complaints. The Utility does not expect the number of claimants to increase significantly in the future, because the statute of limitations for property damage and personal injury in connection with the 2015 Butte fire has expired. Further, due to the commencement of the Chapter 11 Cases, these plaintiffs have been stayed from continuing to prosecute pending litigation and from commencing new lawsuits against PG&E Corporation or the Utility on account of pre-petition obligations. On January 30, 2019, the Court in the coordinated proceeding issued an order staying the action.

On June 22, 2017, the Superior Court of California, County of Sacramento ruled on a motion of several plaintiffs and found that the doctrine of inverse condemnation applied to the Utility with respect to the 2015 Butte fire. On January 4, 2018, the Utility filed with the court a renewed motion for a legal determination of inverse condemnation liability.
On May 1, 2018, the Superior Court of California, County of Sacramento issued its ruling on the Utility’s renewed motion in which the court affirmed, with minor changes, its tentative ruling dated April 25, 2018. The Utility reached agreement with two plaintiffs in the litigation to stipulate to judgment against the Utility on inverse condemnation grounds. The court granted the Utility’s stipulated judgment motion on November 29, 2018 and the Utility filed its appeal on December 11, 2018. As a result of the filing of the Chapter 11 Cases, these lawsuits, including the trial and the appeal from the stipulated judgment, are stayed.

In addition to the coordinated plaintiffs, Cal Fire, the OES, the County of Calaveras, the Calaveras County Water District, and four smaller public entities (three fire districts and the California Department of Veterans Affairs) brought suit or indicated that they intended to do so. The Utility settled the claims of the three fire protection districts and the Calaveras County Water District.

On April 13, 2017, Cal Fire filed a complaint with the Superior Court of California, County of Calaveras, seeking to recover over $87 million for its costs incurred, which proceeding is now stayed. Prior to the stay, the Utility and Cal Fire were also engaged in a mediation process.

Also, on February 20, 2018, the County of Calaveras filed suit against the Utility and the Utility’s vegetation management contractors. The Utility and the County of Calaveras settled the County’s claims in November 2018 for $25 million.

Further, in May 2017, the OES indicated that it intended to bring a claim against the Utility related to the Butte fire that it estimated to be approximately $190 million. The Utility has not received any information or documentation from the OES since its May 2017 statement, other than a proof of claim for $107 million filed with the Bankruptcy Court. In June 2017, the Utility entered into an agreement with the OES that extended its deadline to file a claim to December 2020. As described above, on April 21, 2020, the parties announced that settlement agreements have been reached with certain Federal agencies (including FEMA and the SBA) and certain State agencies (including Cal OES and Cal Fire) regarding their Fire Claims, including in connection with the 2015 Butte fire. PG&E Corporation and the Utility filed a motion seeking Bankruptcy Court approval of the agreements on April 26, 2020. A hearing before the Bankruptcy Court to consider approval of the agreements is currently scheduled for May 12, 2020.

PG&E Corporation’s and the Utility’s obligations with respect to claims related to the 2015 Butte fire that had not been resolved as of the Petition Date are expected to be determined through the Chapter 11 process (including the settlement agreements described in this Note 10).

As discussed under the headings “Plan Support Agreements with Public Entities” and “Restructuring Support Agreement with the TCC,” PG&E Corporation and the Utility have entered into agreements to potentially resolve certain government entity claimholders’ wildfire-related claims arising from the 2015 Butte fire as well as with the TCC and the Consenting Fire Claimant Professionals to potentially resolve all wildfire-related claims arising from the 2015 Butte fire held by individual claimholders.

2018 Camp Fire, 2017 Northern California Wildfires and 2015 Butte Fire Accounting Charge

There were no charges for the three months ended March 31, 2020. At March 31, 2020 and December 31, 2019, the Utility’s Consolidated Balance Sheets include estimated liabilities in respect of total wildfire-related claims of $25.5 billion. The aggregate liability of $25.5 billion for claims in connection with the 2018 Camp fire, the 2017 Northern California wildfires, and the 2015 Butte fire is comprised of (i) $11 billion for subrogated insurance claimholders pursuant to the Subrogation RSA, plus (ii) $47.5 million for expected professional fees for professionals retained by subrogated insurance claimholders to be reimbursed pursuant to the Subrogation RSA, plus (iii) $1 billion for the Supporting Public Entities with respect to their Public Entity Wildfire Claims pursuant to the PSAs, plus (iv) $13.5 billion for all other wildfire-related claims, including individual wildfire claimholders (including those with uninsured and underinsured property losses) and clean-up and fire suppression costs, pursuant to the TCC RSA. The aggregate liability of $25.5 billion for claims in connection with the 2018 Camp fire, the 2017 Northern California wildfires and the 2015 Butte fire corresponds to PG&E Corporation’s and the Utility’s best estimate of probable losses and is subject to change based on additional information, including the other factors discussed below.

In the case of the Tubbs fire and the 37 fire, PG&E Corporation and the Utility continue to believe that if the claims related to these fires were litigated on the merits, it would not be probable that they would incur a loss for such claims. As a result of the entry into the PSAs, the Subrogation RSA and the TCC RSA, PG&E Corporation and the Utility have determined that it is probable they will incur a loss for claims in connection with such fires. With respect to the other 19 of the 2017 Northern California wildfires (the La Porte, McCourtney, Lobo, Honey, Redwood, Sulphur, Cherokee, Blue, Pocket, Atlas, Cascade, Point, Nuns, Norrbom, Adobe, Partrick, Pythian, Youngs and Pressley fires), PG&E Corporation and the Utility previously determined that it is probable they would incur a loss for claims in connection with such fires if such claims were litigated on the merits.
The aggregate liability of $25.5 billion for claims in connection with the 2018 Camp, the 2017 Northern California wildfires and the 2015 Butte fire represents PG&E Corporation’s and the Utility’s best estimate of probable losses and is subject to change based on additional information. Notwithstanding the entry into the PSAs, the Subrogation RSA and the TCC RSA, there are a number of unknown facts and legal considerations that may impact the amount of any potential liability, including whether any termination events are triggered under these agreements, whether the classification and treatment of claims in the Plan is successfully challenged by claimholders who are not party to a settlement agreement, whether the requisite number of impaired claimholders vote to approve the Plan in the Chapter 11 Cases, whether any fines or penalties are treated as Fire Claims as provided in the Plan and whether a plan of reorganization incorporating the terms of those settlements is confirmed. (See “Third-Party Claims, Investigations and Other Proceedings Related to the 2018 Camp Fire and 2017 Northern California Wildfires” above for a summary of material termination rights under the PSAs, the Subrogation RSA and the TCC RSA.) Many of these factors are beyond the control of PG&E Corporation and the Utility. For example, notwithstanding the TCC RSA, the TCC filed a motion in the Bankruptcy Court on April 6, 2020 seeking approval of a letter from the TCC to individual holders of wildfire-related claims requesting that they withhold their votes in favor of the Plan until the Utility provides supplemental disclosure with respect to the Plan and certain issues relating to the value of the stock to be distributed to the Fire Victim Trust (which the Bankruptcy Court denied). The Bankruptcy Court issued an order denying the TCC’s motion on April 7, 2020. If one or more of these settlement agreements is terminated or if one or more classes of impaired claimholders fail to approve the Plan, PG&E Corporation’s and the Utility’s aggregate liability related to the 2018 Camp fire and 2017 Northern California wildfires (and in certain cases, other pre-petition fires) could substantially exceed $25.5 billion. In addition, if these agreements were terminated, regardless of the ultimate determination of PG&E Corporation’s and the Utility’s liability, such termination would be expected to result in additional delay and expense in the Chapter 11 Cases.

Absent settlement agreements or in the event of a failed solicitation of votes for the Plan, the process for estimating losses associated with claims requires management to exercise significant judgment based on a number of assumptions and subjective factors, including but not limited to the cause of each fire, contributing causes of the fires (including alternative potential origins, weather and climate related issues), the number, size and type of structures damaged or destroyed, the contents of such structures and other personal property damage, the number and types of trees damaged or destroyed, attorneys’ fees for claimants, the nature and extent of any personal injuries, including the loss of lives, the extent to which future claims arise, the amount of fire suppression and clean-up costs or other damages the Utility may be responsible for if found negligent or as estimated in the Chapter 11 Cases.

The $25.5 billion liability does not include any amounts for potential losses in connection with the wildfire-related securities class action litigation described below. While the Plan provides that the $25.5 billion liability includes the amount of any penalties or fines that may be imposed by governmental entities, and the amount of any penalties, or fines that might result from any criminal charges brought, it is possible such penalties or fines may ultimately be determined to be separate from and incremental to the $25.5 billion liability. PG&E Corporation and the Utility intend to continue to review the available information and other information as it becomes available. As more information becomes available, management estimates and assumptions regarding the financial impact of the 2018 Camp fire, the 2017 Northern California wildfires and the 2015 Butte fire may change, which could result in material increases to the loss accrued.

2019 Kincade Fire

According to Cal Fire, on October 23, 2019 at approximately 9:27 p.m., a wildfire began northeast of Geyserville in Sonoma County, California (the “2019 Kincade fire”), located in the service territory of the Utility. The Cal Fire Kincade Fire Incident Update dated November 20, 2019, 11:02 a.m. Pacific Time (the “incident update”) indicated that the 2019 Kincade fire had consumed 77,758 acres. In the incident update, Cal Fire reported no fatalities and four first responder injuries. The incident update also indicates the following: structures destroyed, 374 (consisting of 174 residential structures, 11 commercial structures and 189 other structures); and structures damaged, 60 (consisting of 35 residential structures, one commercial structure and 24 other structures). In connection with the 2019 Kincade fire, state and local officials issued numerous mandatory evacuation orders and evacuation warnings at various times for certain areas of the region. Based on County of Sonoma information, PG&E Corporation and the Utility understand that the geographic zones subject to either a mandatory evacuation order or an evacuation warning between October 23, 2019 and November 4, 2019 included approximately 200,000 persons.

On October 23, 2019, by 3:00 p.m. Pacific Time, the Utility had conducted a PSPS event and turned off the power to approximately 27,837 customers in Sonoma County, including Geyserville and the surrounding area. As part of the PSPS, the Utility’s distribution lines in these areas were deenergized. Following the Utility’s established and CPUC-approved PSPS protocols and procedures, transmission lines in these areas remained energized.
The Utility has submitted electric incident reports to the CPUC indicating that:

at approximately 9:19 p.m. Pacific Time on October 23, 2019, the Utility became aware of a transmission level outage on the Geysers #9 Lakeville 230 kV line when the line relayed and did not reclose;

various generating facilities on the Geysers #9 Lakeville 230kV line detected the disturbance and separated at approximately the same time;

at approximately 9:21 p.m. Pacific Time, the PG&E Grid Control Center received a report that a fire had started in an area near transmission tower 001/006;

at approximately 7:30 a.m. Pacific Time on October 24, 2019, a responding Utility troubleman patrolling the Geysers #9 Lakeville 230 kV line observed that Cal Fire had taped off the area around the base of transmission tower 001/006 in the area of the 2019 Kincade fire; and

on site Cal Fire personnel brought to the troubleman’s attention what appeared to be a broken jumper on the same tower.

The cause of the 2019 Kincade fire is under investigation by Cal Fire and the CPUC, and PG&E Corporation and the Utility are cooperating with those investigations. PG&E Corporation and the Utility are also conducting their own investigation into the cause of the 2019 Kincade fire. This investigation is preliminary, and PG&E Corporation and the Utility do not have access to all of the evidence in the possession of Cal Fire or other third parties. There are a number of unknown facts surrounding the cause of the 2019 Kincade fire, and accordingly, the cause of the 2019 Kincade fire remains uncertain.

Based on the facts and circumstances available to PG&E Corporation and the Utility as of the date of this filing, including the information contained in the electric incident report and other information gathered as part of PG&E Corporation’s and the Utility’s investigation, PG&E Corporation and the Utility believe it is reasonably possible that they will incur a loss in connection with the 2019 Kincade fire. If PG&E Corporation and the Utility were to incur a loss in respect of the 2019 Kincade fire, PG&E Corporation and the Utility estimate that the amount of such loss could exceed $600 million (before available insurance). This amount corresponds to the lower end of the range of PG&E Corporation’s and the Utility’s reasonably estimable range of reasonably possible losses and is subject to change based on additional information. The $600 million estimate of the lower end of the range of reasonably possible losses does not include, among other things, (i) any amounts for potential penalties or fines that may be imposed by governmental entities on PG&E Corporation or the Utility, (ii) any punitive damages, (iii) any amounts in respect of compensation claims by Federal, state, county and local government entities or agencies other than state fire suppression costs, (iv) evacuation costs or (v) any other amounts that are not reasonably estimable.

PG&E Corporation and the Utility currently believe that it is reasonably possible that the amount of loss could be greater than $600 million (before available insurance) but are unable to reasonably estimate the additional loss and the upper end of the range because, as described above, there are a number of unknown facts and legal considerations that may impact the amount of any potential liability, including the total scope and nature of claims that may be asserted against PG&E Corporation and the Utility. PG&E Corporation and the Utility intend to continue to review the available information and other information as it becomes available, including evidence in Cal Fire’s possession, evidence from or held by other parties, claims that have not yet been submitted, and additional information about the nature and extent of potential damages.

The process for estimating losses associated with potential claims related to the 2019 Kincade fire requires management to exercise significant judgment based on a number of assumptions and subjective factors, including the factors identified above and estimates based on currently available information and prior experience with wildfires. As more information becomes available, management estimates and assumptions regarding the potential financial impact of the 2019 Kincade fire may change.

In the future, it is possible that facts could emerge that lead PG&E Corporation and the Utility to believe that a loss is probable, resulting in the accrual of a liability at that time, the amount of which could be significant and may exceed the foregoing estimate of the lower end of the range of reasonably possible losses. For the reasons discussed above, the 2019 Kincade fire could have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows, as well as on the bankruptcy timing and process and the ability of the Utility to participate in the Wildfire Fund.

PG&E Corporation and the Utility have received and are responding to data requests from the CPUC’s SED relating to the Kincade fire. Various other entities, including law enforcement agencies, may also be investigating the fire. It is uncertain when the investigations will be complete.
Loss Recoveries

PG&E Corporation and the Utility have insurance coverage for liabilities, including wildfire. Additionally, there are several mechanisms that allow for recovery of costs from customers. Potential for recovery is described below. Failure to obtain a substantial or full recovery of costs related to the 2018 Camp fire and 2017 Northern California wildfires or any conclusion that such recovery is no longer probable could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. In addition, the inability to recover costs in a timely manner could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

Insurance

The Utility has liability insurance from various insurers that provides coverage for third-party liability attributable to the 2015 Butte fire in an aggregate amount of $922 million. The Utility records insurance recoveries when it is deemed probable that a recovery will occur and the Utility can reasonably estimate the amount or its range. Through March 31, 2020, the Utility recorded $922 million for probable insurance recoveries in connection with losses related to the 2015 Butte fire. While the Utility plans to seek recovery of all insured losses, it is unable to predict the ultimate amount and timing of such insurance recoveries. In addition, the Utility has received $60 million in cumulative reimbursements from the insurance policies of its vegetation management contractors. Recoveries of additional amounts under the insurance policies of the Utility’s vegetation management contractors, including policies where the Utility is listed as an additional insured, are uncertain.

The balance for the insurance receivable is included in Other accounts receivable in PG&E Corporation’s and the Utility’s Consolidated Balance Sheets and was $50 million at both March 31, 2020 and December 31, 2019, respectively.

In 2018, PG&E Corporation and the Utility renewed their liability insurance coverage for wildfire events in an aggregate amount of approximately $1.4 billion for the period from August 1, 2018 through July 31, 2019, comprised of $700 million for general liability (subject to an initial self-insured retention of $10 million per occurrence), and $700 million for property damages only, which property damage coverage includes an aggregate amount of approximately $200 million through the reinsurance market where a catastrophe bond was utilized. In 2020, PG&E Corporation and the Utility has liability insurance coverage for wildfire events in an amount of $430 million (subject to an initial self-insured retention of $10 million per occurrence) for the period from August 1, 2019 through July 31, 2020, and approximately $1 billion in liability insurance coverage for non-wildfire events (subject to an initial self-insured retention of $10 million per occurrence), comprised of $520 million for the period from August 1, 2019 through July 31, 2020 and $480 million for the period from September 3, 2019 through September 2, 2020. PG&E Corporation and the Utility continue to pursue additional insurance coverage. Various coverage limitations applicable to different insurance layers could result in uninsured costs in the future depending on the amount and type of damages resulting from covered events. PG&E Corporation and the Utility expect to receive the insurance recoveries associated with the 2018 Camp fire and 2017 Northern California wildfires shortly after emergence from Chapter 11.

PG&E Corporation and the Utility record a receivable for insurance recoveries when it is deemed probable that recovery of a recorded loss will occur. Through March 31, 2020, PG&E Corporation and the Utility recorded $1.38 billion for probable insurance recoveries in connection with the 2018 Camp fire and $843 million for probable insurance recoveries in connection with the 2017 Northern California wildfires. These amounts reflect an assumption that the cause of each fire is deemed to be a separate occurrence under the insurance policies. PG&E Corporation and the Utility intend to seek full recovery for all insured losses.

If PG&E Corporation and the Utility are unable to recover the full amount of their insurance, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected. Even if PG&E Corporation and the Utility were to recover the full amount of their insurance, PG&E Corporation and the Utility expect their losses in connection with the 2018 Camp fire and the 2017 Northern California wildfires will substantially exceed their available insurance.

The balances for insurance receivables with respect to the 2018 Camp fire and the 2017 Northern California wildfires are included in Other accounts receivable in PG&E Corporation’s and the Utility’s Condensed Consolidated Balance Sheets. The balance for insurance receivable for the 2018 Camp fire was $1.38 billion as of March 31, 2020 and December 31, 2019. The balance for insurance receivable for the 2017 Northern California wildfires was $807 million as of March 31, 2020 and December 31, 2019, respectively.
Regulatory Recovery

On June 21, 2018, the CPUC issued a decision granting the Utility’s request to establish a WEMA to track specific incremental wildfire liability costs effective as of July 26, 2017. The decision does not grant the Utility rate recovery of any wildfire-related costs. Any such rate recovery would require CPUC authorization in a separate proceeding. The Utility may be unable to fully recover costs in excess of insurance, if at all. Rate recovery is uncertain; therefore, the Utility has not recorded a regulatory asset related to any wildfire claims costs. Even if such recovery is possible, it could take a number of years to resolve and a number of years to collect.

In addition, SB 901, signed into law on September 21, 2018, requires the CPUC to establish a CHT, directing the CPUC to limit certain disallowances in the aggregate, so that they do not exceed the maximum amount that the Utility can pay without harming ratepayers or materially impacting its ability to provide adequate and safe service. SB 901 also authorizes the CPUC to issue a financing order that permits recovery, through the issuance of recovery bonds (also referred to as “securitization”), of wildfire-related costs found to be just and reasonable by the CPUC and, only for the 2017 Northern California wildfires, any amounts in excess of the CHT. SB 901 does not authorize securitization with respect to possible 2018 Camp fire costs.

On January 10, 2019, the CPUC adopted an OIR, which establishes a process to develop criteria and a methodology to inform determinations of the CHT in future applications under Section 451.2(a) of the Public Utilities Code for recovery of costs related to the 2017 Northern California wildfires.

On July 8, 2019, the CPUC issued a decision in the CHT proceeding. The decision adopts a methodology to determine the CHT based on (1) the maximum additional debt that a utility can take on and maintain a minimum investment grade credit rating; (2) excess cash available to the utility; (3) a potential regulatory adjustment of 20% of the CHT or 5% of the total disallowed wildfire liabilities; and (4) an adjustment to preserve for ratepayers any tax benefits associated with the CHT. The decision also requires a utility to include proposed ratepayer protection measures to mitigate harm to ratepayers as part of an application under Section 451.2(b).

Pursuant to SB 901 and the CPUC’s methodology adopted in the CHT OIR, on April 30, 2020, the Utility filed an application with the CPUC seeking authorization for a post-emergence transaction to securitize $7.5 billion of 2017 wildfire claims costs that is designed to be rate neutral to customers, with the proceeds used to pay or reimburse the Utility for the payment of wildfire claims costs associated with the 2017 Northern California wildfires. As a result of the proposed transaction, the Utility would retire $6.0 billion of temporary Utility debt and accelerate a $700 million payment due to the Fire Victim Trust post-Effective Date.

Failure to obtain a substantial or full recovery of costs related to wildfires could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows.

Wildfire-Related Derivative Litigation

Two purported derivative lawsuits alleging claims for breach of fiduciary duties and unjust enrichment were filed in the San Francisco County Superior Court on November 16, 2017 and November 20, 2017, respectively, naming as defendants certain current and former members of the Board of Directors and certain current and former officers of PG&E Corporation and the Utility. PG&E Corporation and the Utility are named as nominal defendants. These lawsuits were consolidated by the court on February 14, 2018, and are denominated In Re California North Bay Fire Derivative Litigation. On April 13, 2018, the plaintiffs filed a consolidated complaint. After the parties reached an agreement regarding a stay of the derivative proceeding pending resolution of the tort actions described above and any regulatory proceeding relating to the 2017 Northern California wildfires, on April 24, 2018, the court entered a stipulation and order to stay. The stay is subject to certain conditions regarding the plaintiffs’ access to discovery in other actions. On January 28, 2019, the plaintiffs filed a request to lift the stay for the purposes of amending their complaint to add allegations regarding the 2018 Camp fire.

On August 3, 2018, a third purported derivative lawsuit, entitled Oklahoma Firefighters Pension and Retirement System v. Chew, et al., was filed in the U.S. District Court for the Northern District of California, naming as defendants certain current and former members of the Board of Directors and certain current and former officers of PG&E Corporation and the Utility. PG&E Corporation is named as a nominal defendant. The lawsuit alleges claims for breach of fiduciary duties and unjust enrichment as well as a claim under Section 14(a) of the federal Securities Exchange Act of 1934 alleging that PG&E Corporation’s and the Utility’s 2017 proxy statement contained misrepresentations regarding the companies’ risk management and safety programs. On October 15, 2018, PG&E Corporation filed a motion to stay the litigation. Prior to the scheduled hearing on this motion, this matter was automatically stayed by PG&E Corporation’s and the Utility’s commencement of bankruptcy proceedings, as discussed below. A case management conference is currently set for July 6, 2020.
On October 23, 2018, a fourth purported derivative lawsuit, entitled City of Warren Police and Fire Retirement System v. Chew, et al., was filed in San Francisco County Superior Court, alleging claims for breach of fiduciary duty, corporate waste and unjust enrichment. It names as defendants certain current and former members of the Board of Directors and certain current and former officers of PG&E Corporation, and names PG&E Corporation as a nominal defendant. The plaintiff filed a request with the court seeking the voluntary dismissal of this matter without prejudice on January 18, 2019.

On November 21, 2018, a fifth purported derivative lawsuit, entitled Williams v. Earley, Jr., et al., was filed in federal court in San Francisco, alleging claims identical to those alleged in the Oklahoma Firefighters Pension and Retirement System v. Chew, et al. lawsuit listed above against certain current and former officers and directors, and naming PG&E Corporation and the Utility as nominal defendants. This lawsuit includes allegations related to the 2017 Northern California wildfires and the 2018 Camp fire. This action was stayed by stipulation of the parties and order of the court on December 21, 2018, subject to resolution of the pending securities class action. A case management conference is currently set for July 6, 2020.

On December 24, 2018, a sixth purported derivative lawsuit, entitled Bowlinger v. Chew, et al., was filed in San Francisco Superior Court, alleging claims for breach of fiduciary duty, abuse of control, corporate waste, and unjust enrichment in connection with the 2018 Camp fire against certain current and former officers and directors, and naming PG&E Corporation and the Utility as nominal defendants. On February 5, 2019, the plaintiff in Bowlinger filed a response to the notice asserting that the automatic stay did not apply to his claims. PG&E Corporation and the Utility accordingly filed a Motion to Enforce the Automatic Stay with the Bankruptcy Court as to the Bowlinger action, which was granted. A case management conference is currently set for July 10, 2020.

On January 25, 2019, a seventh purported derivative lawsuit, entitled Hagberg v. Chew, et al., was filed in San Francisco Superior Court, alleging claims for breach of fiduciary duty, abuse of control, corporate waste, and unjust enrichment in connection with the 2018 Camp fire against certain current and former officers and directors, and naming PG&E Corporation and the Utility as nominal defendants. A case management conference is currently set for July 1, 2020.

On January 28, 2019, an eighth purported derivative lawsuit, entitled Blackburn v. Meserve, et al., was filed in federal court alleging claims for breach of fiduciary duty, unjust enrichment, and waste of corporate assets in connection with the 2017 Northern California wildfires and the 2018 Camp fire against certain current and former officers and directors, and naming PG&E Corporation as a nominal defendant. A case management conference is currently set for July 9, 2020.

Due to the commencement of the Chapter 11 Cases, PG&E Corporation and the Utility filed notices in each of these proceedings on February 1, 2019, reflecting that the proceedings are automatically stayed pursuant to section 362(a) of the Bankruptcy Code. PG&E Corporation’s and the Utility’s rights with respect to the derivative claims asserted against former officers and directors of PG&E Corporation and the Utility were assigned to the Fire Victim Trust under the TCC RSA.

Securities Class Action Litigation

Wildfire-Related Class Action

In June 2018, two purported securities class actions were filed in the United States District Court for the Northern District of California, naming PG&E Corporation and certain of its current and former officers as defendants, entitled David C. Weston v. PG&E Corporation, et al. and Jon Paul Moretti v. PG&E Corporation, et al., respectively.  The complaints alleged material misrepresentations and omissions related to, among other things, vegetation management and transmission line safety in various PG&E Corporation public disclosures. The complaints asserted claims under Section 10(b) and Section 20(a) of the federal Securities Exchange Act of 1934 and Rule 10b-5 promulgated thereunder, and sought unspecified monetary relief, interest, attorneys’ fees and other costs. Both complaints identified a proposed class period of April 29, 2015 to June 8, 2018. On September 10, 2018, the court consolidated both cases and the litigation is now denominated In re PG&E Corporation Securities Litigation. The court also appointed the Public Employees Retirement Association of New Mexico as lead plaintiff. The plaintiff filed a consolidated amended complaint on November 9, 2018. After the plaintiff requested leave to amend its complaint to add allegations regarding the 2018 Camp fire, the plaintiff filed a second amended consolidated complaint on December 14, 2018.

Due to the commencement of the Chapter 11 Cases, PG&E Corporation and the Utility filed a notice on February 1, 2019, reflecting that the proceedings are automatically stayed pursuant to section 362(a) of the Bankruptcy Code. On February 15, 2019, PG&E Corporation and the Utility filed a complaint in Bankruptcy Court against the plaintiff seeking preliminary and permanent injunctive relief to extend the stay to the claims alleged against the individual officer defendants.
On February 22, 2019, a purported securities class action was filed in the United States District Court for the Northern District of California, entitled York County on behalf of the York County Retirement Fund, et al. v. Rambo, et al. (the “York County Action”). The complaint names as defendants certain current and former officers and directors, as well as the underwriters of four public offerings of notes from 2016 to 2018. Neither PG&E Corporation nor the Utility is named as a defendant. The complaint alleges material misrepresentations and omissions in connection with the note offerings related to, among other things, PG&E Corporation’s and the Utility’s vegetation management and wildfire safety measures. The complaint asserts claims under Section 11 and Section 15 of the Securities Act of 1933, and seeks unspecified monetary relief, attorneys’ fees and other costs, and injunctive relief. On May 7, 2019, the York County Action was consolidated with In re PG&E Corporation Securities Litigation.

On May 28, 2019, the plaintiffs in the consolidated securities actions filed a third amended consolidated class action complaint, which includes the claims asserted in the previously-filed actions and names as defendants PG&E Corporation, the Utility, certain current and former officers and directors, and the underwriters. The action remains stayed as to PG&E Corporation and the Utility. On August 28, 2019, the Bankruptcy Court denied PG&E Corporation’s and the Utility’s request to extend the stay to the claims against the officer, director, and underwriter defendants. On October 4, 2019, the officer, director, and underwriter defendants filed motions to dismiss the third amended complaint, which motions are currently under submission with the District Court.

The named plaintiffs in the consolidated securities actions filed proofs of claim with the Bankruptcy Court on or before the bar date that reflect their securities litigation claims against PG&E Corporation and the Utility. On December 9, 2019, the lead plaintiff in the consolidated securities actions filed a motion seeking approval from the Bankruptcy Court to treat its proof of claim as a class proof of claim. On February 27, 2020, the Bankruptcy Court issued an order denying the motion, but extending the bar date for putative class members to file proofs of claim until April 16, 2020. On March 6, 2020, the plaintiffs filed a notice of appeal regarding the denial of their motion.

De-energization Class Action

On October 25, 2019, a purported securities class action was filed in the United States District Court for the Northern District of California, entitled Vataj v. Johnson et al. The complaint named as defendants a current director and certain current and former officers of PG&E Corporation. Neither PG&E Corporation nor the Utility was named as a defendant. The complaint alleged materially false and misleading statements regarding PG&E Corporation’s wildfire prevention and safety protocols and policies, including regarding the Utility’s public safety power shutoffs, that allegedly resulted in losses and damages to holders of PG&E Corporation’s securities. The complaint asserted claims under Section 10(b) and Section 20(a) of the federal Securities Exchange Act of 1934 and Rule 10b-5 promulgated thereunder, and sought unspecified monetary relief, attorneys’ fees and other costs. On February 3, 2020, the District Court granted a stipulation appointing Iron Workers Local 580 Joint Funds, Ironworkers Locals 40,361 & 417 Union Security Funds and Robert Allustiarti co-lead plaintiffs and approving the selection of the plaintiffs’ counsel, and further ordered the parties to submit a proposed schedule by February 13, 2020. On February 20, 2020, the District Court issued a scheduling order that required the amended complaint to be filed by April 17, 2020.

On April 17, 2020, the plaintiffs filed an amended complaint asserting the same claims. The amended complaint adds PG&E Corporation and a former officer of PG&E Corporation as defendants, and no longer asserts claims against two officers of PG&E Corporation previously named in the action. As of April 30, 2020, PG&E Corporation had not yet been served with this complaint.

Given the early stages of the litigations, including but not limited to the fact that defendants’ motions to dismiss have not yet been decided and no discovery has occurred in the consolidated class action litigation or, the de-energization class action, PG&E Corporation and the Utility are unable to reasonably estimate the amount of any potential loss.
Indemnification Obligations

To the extent permitted by law, PG&E Corporation and the Utility have obligations to indemnify directors and officers for certain events or occurrences while a director or officer is or was serving in such capacity, which indemnification obligations extend to the claims asserted against the directors and officers in the securities class action. PG&E Corporation and the Utility maintain directors and officers insurance coverage to reduce their exposure to such indemnification obligations. PG&E Corporation and the Utility have provided notice to their insurance carriers of the claims asserted in the wildfire-related securities class actions and derivative litigation, and are in communication with the carriers regarding the applicability of the directors and officers insurance policies to those matters. PG&E Corporation and the Utility additionally have potential indemnification obligations to the underwriters for the Utility’s note offerings, pursuant to the underwriting agreements associated with those offerings. PG&E Corporation’s and the Utility’s indemnification obligations to the officers, directors and underwriters may be limited or affected by the Chapter 11 Cases.

District Attorneys’ Offices’ Investigations

Following the 2018 Camp fire, the Butte County District Attorney’s Office and the California Attorney General’s Office opened a criminal investigation of the 2018 Camp fire. PG&E Corporation and the Utility were informed by the Butte County District Attorney’s Office and the California Attorney General’s Office that a grand jury had been empaneled in Butte County.

On March 17, 2020, the Utility entered into the Plea Agreement and Settlement (the “Plea Agreement”) with the People of the State of California, by and through the Butte County District Attorney’s office (the “People” and the “Butte DA,” respectively) to resolve the criminal prosecution of the Utility in connection with the 2018 Camp fire. Subject to the terms and conditions of the Plea Agreement, the Utility has agreed to plead guilty to 84 counts of involuntary manslaughter in violation of Penal Code section 192(b) and one count of unlawfully causing a fire in violation of Penal Code section 452, and to admit special allegations pursuant to Penal Code sections 452.1(a)(2), 452.1(a)(3) and 452.1(a)(4). Upon approval and acceptance of the Plea Agreement by the Butte County Superior Court and the Bankruptcy Court, the People have agreed not to prosecute any other criminal charges related to or arising out of the 2018 Camp fire against the Utility, PG&E Corporation or any of their subsidiaries, including PG&E Corporation and the Utility as reorganized pursuant to the Chapter 11 Cases.

Pursuant to the Plea Agreement, the Utility will be sentenced to pay the maximum total fine and penalty of approximately $3.5 million. This $3.5 million fine and penalty will not be paid from the amounts to be distributed by the Utility to the Fire Victim Trust. The Plea Agreement provides that no other or additional sentence will be imposed on the Utility in the criminal action in connection with the 2018 Camp fire. The Utility has also agreed to pay $500,000 to the Butte County District Attorney Environmental and Consumer Protection Fund to reimburse costs spent on the investigation of the 2018 Camp fire.

Pursuant to the Plea Agreement, the Utility may withdraw the plea if, among other things, (a) the Plea Agreement is not approved by the Butte County Superior Court, or (b) the Agreement is not approved by the Bankruptcy Court or the Plan is not confirmed by the Bankruptcy Court on or before June 30, 2020 or does not become effective in accordance with the terms thereof. If the plea is withdrawn by the Utility, the indictment referenced in the Agreement shall remain.

Simultaneous with entry into the Plea Agreement, the Utility has committed to spend up to $15 million over five years to provide water to Butte County residents impacted by damage to the Utility’s Miocene Canal caused by the 2018 Camp fire. In addition, the Utility has consented to the Butte DA consulting, sharing information with and receiving information from the monitor overseeing the Utility’s probation related to the San Bruno explosion through the expiration of the Utility’s term of probation and in no event until later than January 31, 2022. This consent is subject to the approval of the federal court overseeing the Utility’s probation and the monitor.

On March 23, 2020, PG&E Corporation and the Utility filed a motion with the Bankruptcy Court seeking authority to enter into the Plea Agreement. On April 16, 2020, the Bankruptcy Court approved PG&E Corporation’s and the Utility’s Plea Agreement.

Additional investigations and other actions may arise out of the other 2017 Northern California wildfires, the 2018 Camp fire, and the 2019 Kincade fire. The timing and outcome for resolution of the referrals by Cal Fire relating to the 2019 Kincade fire to the applicable county District Attorneys’ offices are uncertain.
SEC Investigation

On March 20, 2019, PG&E Corporation learned that the SEC’s San Francisco Regional Office was conducting an investigation related to PG&E Corporation’s and the Utility’s public disclosures and accounting for losses associated with the 2018 Camp fire, the 2017 Northern California wildfires and the 2015 Butte fire. PG&E Corporation and the Utility are unable to predict the timing and outcome of the investigation.

Clean-up and Repair Costs

The Utility incurred costs of $786 million for clean-up and repair of the Utility’s facilities (including $327 million in capital expenditures) through March 31, 2020, in connection with the 2018 Camp fire. The Utility also incurred costs of $365 million for clean-up and repair of the Utility’s facilities (including $187 million in capital expenditures) through March 31, 2020, in connection with the 2017 Northern California wildfires. In addition, the Utility incurred costs of $60 million for clean-up and repair of the Utility’s facilities (including $17 million in capital expenditures) through March 31, 2020, in connection with the 2019 Kincade fire. The Utility is authorized to track and seek recovery of clean-up and repair costs through CEMA. (CEMA requests are subject to CPUC approval.) The Utility capitalizes and records as regulatory assets costs that are probable of recovery. At March 31, 2020, the CEMA regulatory asset balances related to the 2019 Kincade fire, 2018 Camp fire, and 2017 Northern California wildfires were $34 million, zero, and $67 million, respectively, and are included in long-term regulatory assets on the Condensed Consolidated Balance Sheets. Additionally, other than the amounts subject to the settlement agreement, as modified by the Decision Different issued on April 20, 2020, in connection with the OII into the 2017 Northern California wildfires and the 2018 Camp fire, the capital expenditures for clean-up and repair are included in property, plant and equipment at March 31, 2020.

Should PG&E Corporation and the Utility conclude that recovery of any clean-up and repair costs included in the CEMA is no longer probable, PG&E Corporation and the Utility will record a charge in the period such conclusion is reached. Failure to obtain a substantial or full recovery of these costs could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

Wildfire Assistance Fund

On May 24, 2019, the Bankruptcy Court entered an order authorizing PG&E Corporation and the Utility to establish and fund a program (the “Wildfire Assistance Fund”) to assist those displaced by the 2018 Camp fire and 2017 Northern California wildfires with the costs of substitute or temporary housing and other urgent needs. The Utility fully funded $105 million into the Wildfire Assistance Fund on August 2, 2019. As of March 31, 2020, the administrator issued claimant payments totaling $74 million under the Wildfire Assistance Fund.

Wildfire Fund under AB 1054

On July 12, 2019, the California Governor signed into law AB 1054, a bill which provides for the establishment of a statewide fund that will be available for eligible electric utility companies to pay eligible claims for liabilities arising from wildfires occurring after July 12, 2019 that are caused by the applicable electric utility company’s equipment, subject to the terms and conditions of AB 1054. Eligible claims are claims for third party damages resulting from any such wildfires, limited to the portion of such claims that exceeds the greater of (i) $1.0 billion in the aggregate in any calendar year and (ii) the amount of insurance coverage required to be in place for the electric utility company pursuant to Section 3293 of the Public Utilities Code, added by AB 1054.

Electric utility companies that draw from the fund will only be required to repay amounts that are determined by the CPUC in an application for cost recovery not to be just and reasonable, subject to a rolling three-year disallowance cap equal to 20% of the electric utility company’s transmission and distribution equity rate base. For the Utility, this disallowance cap is expected to be approximately $2.4 billion for the three-year period starting in 2019, subject to adjustment based on changes in the Utility’s total transmission and distribution equity rate base. The disallowance cap is inapplicable in certain circumstances, including if the Wildfire Fund administrator determines that the electric utility company’s actions or inactions that resulted in the applicable wildfire constituted “conscious or willful disregard for the rights and safety of others,” or the electric utility company fails to maintain a valid safety certification. Costs that the CPUC determines to be just and reasonable will not need to be repaid to the fund, resulting in a draw-down of the fund.
The Wildfire Fund and disallowance cap will be terminated when the amounts therein are exhausted. The Wildfire Fund is expected to be capitalized with (i) $10.5 billion of proceeds of bonds supported by a 15-year extension of the Department of Water Resources charge to ratepayers, (ii) $7.5 billion in initial contributions from California’s three investor-owned electric utility companies and (iii) $300 million in annual contributions paid by California’s three investor-owned electric utility companies. The contributions from the investor-owned electric utility companies will be effectively borne by their respective shareholders, as they will not be permitted to recover these costs from ratepayers. The costs of the initial and annual contributions are allocated among the three investor-owned electric utility companies pursuant to a “Wildfire Fund allocation metric” set forth in AB 1054 based on land area in the applicable utility’s service territory classified as high fire threat districts and adjusted to account for risk mitigation efforts. The Utility’s initial Wildfire Fund allocation metric is expected to be 64.2% (representing an initial contribution of approximately $4.8 billion and annual contributions of approximately $193 million). The Wildfire Fund will only be available for payment of eligible claims so long as there are sufficient funds remaining in the Wildfire Fund. Such funds could be depleted more quickly than expected, including as a result of claims made by California’s other participating electric utility companies.

AB 1054 also provides that the first $5.0 billion expended in the aggregate by California’s three investor-owned electric utility companies on fire risk mitigation capital expenditures included in their respective approved WMPs will be excluded from their respective equity rate bases. The $5.0 billion of capital expenditures will be allocated among the investor-owned electric utility companies in accordance with their Wildfire Fund allocation metrics (described above). AB 1054 contemplates that such capital expenditures may be securitized through a customer charge.

On July 23, 2019, the Utility notified the CPUC of its intent to participate in the Wildfire Fund. On August 7, 2019, PG&E Corporation and the Utility submitted a motion with the Bankruptcy Court for the entry of an order authorizing PG&E Corporation and the Utility to participate in the Wildfire Fund and to make any initial and annual contributions to the Wildfire Fund upon emergence from Chapter 11. On August 26, 2019, the Bankruptcy Court entered an order granting such authorizations. In order to participate in the Wildfire Fund, the Utility must also meet the eligibility and other requirements set forth in AB 1054, and pay its share of the initial contribution to the Wildfire Fund upon emergence from Chapter 11. In such event (assuming the Utility satisfies the eligibility and other requirements set forth in AB 1054), the Wildfire Fund will be available to the Utility to pay for eligible claims arising between the effective date of AB 1054 and the Utility’s emergence from Chapter 11, subject to a limit of 40% of the amount of such claims. The balance of any such claims would need to be addressed through the Chapter 11 Cases.

The Utility expects to record its required contributions as an asset and amortize the asset over the estimated life of the Wildfire Fund. The Wildfire Fund asset will be further adjusted for impairment as the assets are used to pay eligible claims, which will result in decreases to the assets available for coverage of future events. AB 1054 does not establish a definite term of the Wildfire Fund; therefore, this accounting treatment is subject to significant judgments and estimates. The assumptions create a high degree of uncertainty related to the estimated useful life of the Wildfire Fund. The most significant assumption is the number and severity of catastrophic fires that could occur in California within the participating electric utilities’ service territories during the term of the Wildfire Fund. The Utility intends to utilize historical, publicly available fire-loss data as a starting point; however, future fire-loss can be difficult to estimate due to uncertainties around the impacts of climate change, land use changes, and mitigation efforts by the California electric utility companies.

Other assumptions include the estimated cost of wildfires caused by other electric utilities, the amount at which wildfire claims will be settled, the likely adjudication of the CPUC in cases of electric utility-caused wildfires, the level of future insurance coverage held by the electric utilities, and the future transmission and distribution equity rate base growth of other electric utilities. Significant changes in any of these estimates could materially impact the amortization period. There could also be a significant delay between the occurrence of a wildfire and the timing of which the Utility recognizes impairment for the reduction in future coverage, due to the lack of data available to the Utility following a catastrophic event, especially if the wildfire occurs in the service territory of another electric utility. As of March 31, 2020, the Utility has not reflected the required contributions in its Consolidated Financial Statements as it has not yet satisfied all of the Wildfire Fund eligibility criteria pursuant to AB 1054.
In order to participate in the Wildfire Fund, within 60 days of the effective date of AB 1054, the Utility must obtain the Bankruptcy Court’s approval of the Utility’s election to pay the initial and annual Wildfire Fund contributions upon emergence from Chapter 11, which approval was granted by the Bankruptcy Court on August 26, 2019. The Utility would then be required to pay its share of the initial contribution to the Wildfire Fund upon emergence from Chapter 11, and meet certain eligibility requirements listed below, in order to participate in the Wildfire Fund. In such event (assuming the Utility satisfies the eligibility and other requirements set forth in AB 1054), the Wildfire Fund will be available to the Utility to pay for eligible claims arising between the effective date of AB 1054 and the Utility’s emergence from Chapter 11, subject to a limit of 40% of the amount of such claims. The balance of any such claims would need to be addressed through the Chapter 11 Cases. There are several additional eligibility requirements for the Utility, including that by June 30, 2020, the following conditions are satisfied:

the Utility’s Chapter 11 Case has been resolved pursuant to a plan of reorganization or similar document not subject to a stay;

the Bankruptcy Court has determined that the resolution of the Utility’s Chapter 11 Case provides funding or otherwise provides for the satisfaction of any pre-petition wildfire claims asserted against the Utility in the Chapter 11 Case, in the amounts agreed upon in any settlement agreements, authorized by the Bankruptcy Court through an estimation process or otherwise allowed by the Bankruptcy Court;

the CPUC has approved the Utility’s plan of reorganization and other documents resolving its Chapter 11 Case, including the Utility’s resulting governance structure as being acceptable in light of the Utility’s safety history, criminal probation, recent financial condition and other factors deemed relevant by the CPUC;

the CPUC has determined that the Utility’s plan of reorganization and other documents resolving its Chapter 11 Case are (i) consistent with California’s climate goals as required pursuant to the California Renewables Portfolio Standard Program and related procurement requirements and (ii) neutral, on average, to the Utility’s ratepayers; and

the CPUC has determined that the Utility’s plan of reorganization and other documents resolving its Chapter 11 Case recognize the contributions of ratepayers, if any, and compensate them accordingly through mechanisms approved by the CPUC, which may include sharing of value appreciation.
OTHER CONTINGENCIES AND COMMITMENTS
PG&E Corporation and the Utility have significant contingencies arising from their operations, including contingencies related to enforcement and litigation matters and environmental remediation.  A provision for a loss contingency is recorded when it is both probable that a loss has been incurred and the amount of the loss can be reasonably estimated. PG&E Corporation and the Utility evaluate the range of reasonably estimated losses and record a provision based on the lower end of the range, unless an amount within the range is a better estimate than any other amount. The assessment of whether a loss is probable or reasonably possible, and whether the loss or a range of loss is estimable, often involves a series of complex judgments about future events. Loss contingencies are reviewed quarterly and estimates are adjusted to reflect the impact of all known information, such as negotiations, discovery, settlements and payments, rulings, advice of legal counsel, and other information and events pertaining to a particular matter. PG&E Corporation’s and the Utility’s policy is to exclude anticipated legal costs from the provision for loss and expense these costs as incurred.

The Utility also has substantial financial commitments in connection with agreements entered into to support its operating activities.  See “Purchase Commitments” below.

PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows may be materially affected by the outcome of the following matters.
Enforcement Matters

U.S. District Court Matters and Probation

In connection with the Utility’s probation proceeding, the United States District Court for the Northern District of California has the ability to impose additional probation conditions on the Utility. Additional conditions, if implemented, could be wide-ranging and would impact the Utility’s operations, number of employees, costs and financial performance. Depending on the terms of these additional requirements, costs in connections with such requirements could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.
CPUC and FERC Matters
Order Instituting Investigation into the 2017 Northern California Wildfires and the 2018 Camp Fire

On June 27, 2019, the CPUC issued the Wildfires OII to determine whether the Utility “violated any provision(s) of the California Public Utilities Code (PU Code), Commission General Orders (GO) or decisions, or other applicable rules or requirements pertaining to the maintenance and operation of its electric facilities that were involved in igniting fires in its service territory in 2017.” On December 5, 2019, the assigned commissioner issued a second amended scoping memo and ruling that amended the scope of issues to be considered in this proceeding to include the 2018 Camp fire.

As previously disclosed, on December 17, 2019, the Utility, the SED of the CPUC, the CPUC’s Office of the Safety Advocate, and CUE jointly submitted to the CPUC a proposed settlement agreement in connection with this proceeding and jointly moved for its approval.

Pursuant to the settlement agreement, the Utility agreed to (i) not seek rate recovery of wildfire-related expenses and capital expenditures in future applications in the amount of $1.625 billion, as specified below, and (ii) incur costs of $50 million in shareholder-funded system enhancement initiatives as described further in the settlement agreement. The settlement agreement stipulates that no violations have been identified in the Tubbs fire. As a result of this finding, the settlement agreement does not prevent the Utility from seeking recovery of costs associated with the Tubbs fire through rates. The amounts set forth in the table below include actual recorded costs and forecasted cost estimates for expenses and capital expenditures which the Utility has incurred or will incur to comply with its legal obligations to provide safe and reliable service.

(in millions)
Description(1)
ExpenseCapitalTotal
Distribution Safety Inspections and Repairs Expense (FRMMA/WMPMA)(2)
$236  $—  $236  
Transmission Safety Inspections and Repairs Expense (TO)(3)
433  —  433  
Vegetation Management Support Costs (FHPMA)36  —  36  
2017 Northern California Wildfires CEMA Expense and Capital (CEMA)82  66  148  
2018 Camp Fire CEMA Expense (CEMA)435  —  435  
2018 Camp Fire CEMA Capital for Restoration (CEMA)—  253  253  
2018 Camp Fire CEMA Capital for Temporary Facilities (CEMA)(4)
—  84  84  
Total$1,222  $403  $1,625  
(1) Unless indicated otherwise, all amounts included in the table reflect actual recorded costs for 2019.
(2) Includes $29 million forecasted for 2020.
(3) Transmission amounts are under the FERC’s regulatory authority.
(4) Includes $59 million forecasted for 2020.

To the extent the recorded costs for each account apart from Transmission Safety Repairs total an amount that is different from $1.420 billion, then the amount for which the Utility shall not seek rate recovery for Transmission Safety Repairs will be adjusted so that the total amount for which the Utility shall not seek rate recovery equals $1.625 billion.

PG&E Corporation and the Utility record a charge when it is both probable that costs incurred or projected to be incurred for recently completed plant will not be recoverable through rates charged to customers and the amount of disallowance can be reasonably estimated.

As of March 31, 2020, PG&E Corporation and the Utility recorded charges of $344 million, related to the portion of the $403 million in disallowed capital that had been spent through March 31, 2020 and, in 2020, expects to record $59 million related to capital expenditures listed in the table above. In addition, PG&E Corporation and Utility recorded charges of approximately $71 million related to vegetation management and catastrophic event expense costs that were previously determined to be probable of recovery and expects to record an additional $19 million in expenses later in 2020.

The Utility expects that the system enhancement spending pursuant to the settlement agreement will occur through 2025.
On February 27, 2020, the presiding officer issued a decision (the “POD”) requiring modifications to the settlement agreement that would (i) add $198 million in disallowances, bringing the total to $1.823 billion (ii) add $64 million in shareholder spending on System Enhancement Initiatives, bringing the total to $114 million; (iii) add a $200 million fine payable to the General Fund of the State of California; and (iv) require the Utility to return any tax savings associated with shareholder payments under the settlement to be “returned for the benefit of ratepayers once [the Utility] has realized the savings” (the “Tax Modification”). On March 18, 2020, the Utility appealed the POD and asked the CPUC to approve the settlement.

On March 27, 2020, the assigned commissioner requested that the full CPUC review the POD (the “Request for Review”) and (i) permanently suspend payment of the $200 million fine; and (ii) make the modification to the tax treatment apply only to shareholder payments for operating expenditures. On April 9, 2020, the Utility filed a response to the Request for Review, reiterating many of the points made in its appeal of the presiding officer decision. The Utility requested that the original settlement be approved or, in the alternative, that the POD’s Tax Modification be eliminated entirely, and the $200 million fine be removed or permanently suspended. Also on April 9, 2020, several parties filed their responses to the request for review, including but not limited to TURN, the SED, and the TCC. TURN supported the Tax Modification but rejected the assigned commissioner’s proposal to suspend the $200 million fine. The SED reiterated its support for the settlement as originally filed, but noted that it does not oppose the modifications set forth in the Request for Review. The TCC did not support any modifications to the settlement, including imposition of the $200 million fine. However, to the extent the fine is imposed, the TCC (1) urged the CPUC to reject the Utility’s request that the fine be designated as a Fire Claim under the Plan of Reorganization payable from the Fire Victim Trust, (2) asked that the Commission not specify the source of payment for the fine, and (3) proposed that the fine should be suspended “until such time, if ever, that a ‘triggering event’ occurs warranting payment.”

On April 20, 2020, the assigned commissioner issued a Decision Different adopting the proposed modifications set forth in the request for review. The Decision Different (i) increases the amount of disallowed wildfire expenditures by $198 million (as set forth in the POD); (ii) increases the amount of shareholder funding for System Enhancement Initiatives by $64 million (as set forth in the POD); (iii) imposes a $200 million fine but permanently suspends payment of the fine; and (iii) limits the tax savings that must be returned to ratepayers to those savings generated by disallowed operating expenditures. The Decision Different also denies all pending appeals of the POD and denies, in part, the Utility’s motion requesting other relief. On April 30, 2020, the Utility submitted its comments on the Decision Different to the CPUC, accepting the modifications. The CPUC could consider and vote on the POD and the Decision Different as early as on May 7, 2020.

The settlement agreement, as modified by the Decision Different, will become effective upon: (i) approval by the CPUC in a written decision, (ii) following such approval by the CPUC, approval of the Bankruptcy Court, and (iii) the effectiveness of a chapter 11 plan of reorganization for the Utility approving the implementation of the settlement agreement. The CPUC may accept, reject or propose alternative terms to the settlement agreement and Decision Different, including imposing additional penalties on the Utility.

The Utility is unable to predict the outcome of this proceeding.
OII and Order to Show Cause into the Utility’s Locate and Mark practices

On December 14, 2018, the CPUC issued an OII and order to show cause to assess the Utility’s practices and procedures related to the locating and marking of natural gas facilities. The OII directed the Utility to show cause as to why the CPUC should not find violations in this matter, and why the CPUC should not impose penalties, and/or any other forms of relief, if any violations are found. The Utility was also directed in the OII to provide a report on specific matters, including that it is conducting locate and mark programs in a safe manner.

On October 3, 2019, the Utility, SED and CUE jointly submitted to the CPUC a proposed settlement agreement. Pursuant to the settlement agreement, the Utility agreed to a total financial remedy of $65 million, comprised of (i) a fine of $5 million funded by shareholders to be paid to the General Fund of the State of California pursuant to, and in accordance with, the time frame and other provisions governing distributions as set forth in the Chapter 11 plan of reorganization for the Utility as confirmed by the Bankruptcy Court; and (ii) $60 million in shareholder-funded initiatives undertaken to enhance, among other things, the Utility’s locate and mark compliance and capabilities and the reliability of the Underground Service Alert ticket management information that the Utility maintains in the ordinary course of its business.
As previously disclosed, on January 17, 2020, the presiding officer issued a decision requiring modifications to the settlement agreement that would (i) require an extension of certain compliance audits required by the settlement agreement, at a cost to shareholders of $6 million, (ii) an additional fine of $39 million funded by shareholders to be paid to the General Fund of the State of California, (iii) certain additional system enhancements, and (iv) requirements on the previously proposed system enhancements, including a requirement that any funds remaining after completion of the system enhancements are not to be spent as agreed to by the parties, but is to be paid to the General Fund. On February 6, 2020, the settling parties filed a motion accepting the presiding officer’s proposed modifications to the settlement and proposing alternative relief.

On February 14, 2020, the presiding officer issued a decision noting that the settling parties had accepted the modifications included in the POD and rejected the alternative relief proposed by the settling parties. The POD became the final decision of the CPUC on February 20, 2020. On April 8, 2020, the Utility filed a motion with the bankruptcy court, seeking the approval of the settlement agreement, as modified by the POD. The bankruptcy court approved this motion on April 24, 2020.

As of March 31, 2020, PG&E Corporation’s and the Utility’s Consolidated Balance Sheets include a $44 million accrual.

This proceeding is not subject to the automatic stay imposed as a result of the commencement of the Chapter 11 Cases; however, collection efforts in connection with fines or penalties arising out of this proceeding are stayed.
OII into Compliance with Ex Parte Communication Rules

On November 23, 2015, the CPUC issued an OII into whether the Utility should be sanctioned for violating rules pertaining to ex parte communications and Rule 1.1 of the CPUC’s Rules of Practice and Procedure governing the conduct of those appearing before the CPUC. The CPUC has subsequently divided the OII into two phases, pertaining to different sets of communications.

As previously disclosed, on December 5, 2019, the CPUC approved a settlement agreement between the Cities of San Bruno and San Carlos, Public Advocates Office, the SED, TURN, and the Utility, resolving phase two of this proceeding (phase one was settled in April 2018, for more information see “OII into Compliance with Ex Parte Communication Rules” in Note 15 of the Notes to the Consolidated Financial Statements in Item 8 the 2019 Form 10-K). Under the settlement agreement, the Utility will pay a total penalty of $10 million comprised of: (1) a $2 million payment to the General Fund of the State of California, (2) forgoing collection of $5 million in revenue requirements during the term of its 2019 GT&S rate case, (3) forgoing collection of $1 million in revenue requirement during the term of its 2020 GRC cycle, and (4) compensation payments of $1 million to each of the Cities of San Bruno and San Carlos. By the terms of the settlement, the financial remedies will not be implemented until a plan of reorganization is approved in the Chapter 11 Cases. In accordance with accounting rules, adjustments related to forgone collections would be recorded in the periods in which they are incurred. On April 8, 2020, the Utility filed a motion with the Bankruptcy Court, seeking the approval of the settlement agreement. The Bankruptcy Court approved this motion on April 24, 2020.

As of March 31, 2020, PG&E Corporation’s and the Utility’s Consolidated Balance Sheets include a $4 million accrual for the amounts payable to the California General Fund and the Cities of San Bruno and San Carlos.
Transmission Owner Rate Case Revenue Subject to Refund

The FERC determines the amount of authorized revenue requirements, including the rate of return on electric transmission assets, that the Utility may collect in rates in the TO rate case. The FERC typically authorizes the Utility to charge new rates based on the requested revenue requirement, subject to refund, before the FERC has issued a final decision. The Utility bills and records revenue based on the amounts requested in its rate case filing and records a reserve for its estimate of the amounts that are probable of refund. Rates subject to refund went into effect on March 1, 2017, and March 1, 2018, for TO18 and TO19, respectively. Rates subject to refund for TO20 went into effect on May 1, 2019.

On October 1, 2018, the ALJ issued an initial decision in the TO18 rate case and the Utility filed initial briefs on October 31, 2018, in response to the ALJ’s recommendations. The Utility expects the FERC to issue a decision in the TO18 rate case in 2020, however, the timing of that decision is uncertain, and it will likely be the subject of requests for rehearing and appeal.

On September 21, 2018, the Utility filed an all-party settlement with the FERC, which was approved by FERC on December 20, 2018, in connection with TO19. As part of the settlement, the TO19 revenue requirement will be set at 98.85% of the revenue requirement for TO18 that will be determined upon issuance of a final unappealable decision in TO18.
On November 30, 2018, the FERC issued an order accepting the Utility’s October 2018 filing of its TO20 formula rate case, subject to hearings and refund, and established May 1, 2019, as the effective date for rate changes.  The FERC also ordered that the hearings will be held in abeyance pending settlement discussions among the parties.  On March 31, 2020, the Utility filed a partial settlement of TO20 resolving certain issues related to the formula rate but leaving several issues including return on equity, capital structure, and depreciation rates for further settlement discussions or hearing.

The Utility is unable to predict the timing or outcome of FERC’s decisions in the TO18 and TO19 proceedings or the timing or outcome of the TO20 proceeding.
Natural Gas Transmission Pipeline Rights-of-Way

In 2012, the Utility notified the CPUC and the SED that the Utility planned to complete a system-wide survey of its transmission pipelines in an effort to address a self-reported violation whereby the Utility did not properly identify encroachments (such as building structures and vegetation overgrowth) on the Utility’s pipeline rights-of-way.  The Utility also submitted a proposed compliance plan that set forth the scope and timing of remedial work to remove identified encroachments over a multi-year period and to pay penalties if the proposed milestones were not met.  In March 2014, the Utility informed the SED that the survey had been completed and that remediation work, including removal of the encroachments, was expected to continue for several years. The SED has not addressed the Utility’s proposed compliance plan, and it is reasonably possible that the SED will impose fines on the Utility in the future based on the Utility’s failure to continuously survey its system and remove encroachments.  The Utility is unable to reasonably estimate the amount or range of future charges that could be incurred given the SED’s wide discretion and the number of factors that can be considered in determining penalties.
Other Matters

PG&E Corporation and the Utility are subject to various claims, lawsuits, and regulatory proceedings that separately are not considered material.  Accruals for contingencies related to such matters (excluding amounts related to the contingencies discussed above under “Enforcement and Litigation Matters”) totaled $117 million and $116 million at March 31, 2020 and December 31, 2019, respectively, and were included in LSTC. PG&E Corporation and the Utility do not believe it is reasonably possible that the resolution of these matters will have a material impact on their financial condition, results of operations, or cash flows.

PSPS Class Action

On December 19, 2019, a complaint was filed in the United States Bankruptcy Court for the Northern District of California naming PG&E Corporation and the Utility. The plaintiff seeks certification of a class consisting of all California residents and business owners who had their power shut off by the Utility during the October 9, October 23, October 26, October 28, or November 20, 2019 power outages and any subsequent voluntary outages occurring during the course of litigation. The plaintiff alleges that the necessity for the October and November 2019 power shutoff events was caused by the Utility’s negligence in failing to properly maintain its electrical lines and surrounding vegetation. The complaint seeks up to $2.5 billion in special and general damages, punitive and exemplary damages and injunctive relief to require the Utility to properly maintain and inspect its power grid. PG&E Corporation and the Utility believe the allegations are without merit and intend to defend this lawsuit vigorously.

On January 21, 2020, PG&E Corporation and the Utility filed a motion to dismiss the complaint or in the alternative strike the class action allegations. The motion to dismiss and strike was heard by the Bankruptcy Court on March 10, 2020, and on April 3, 2020, the Bankruptcy Court entered an order dismissing the action without leave to amend, finding that the action was preempted under the California Public Utilities Code.

On March 30, 2020, the Bankruptcy Court issued an opinion granting the Utility's motion to dismiss this class action. The court held that plaintiff’s class action claims are preempted as a matter of law by section 1759 of the California Public Utilities Code and thus plaintiffs could not pursue civil damages. The court stated that “any claim for damages caused by PSPS events approved by the CPUC, even if based on pre-existing events that may or may not have contributed to the necessity of the PSPS events, would interfere with the CPUC’s policy-making decisions.”

On April 6, 2020, plaintiff filed a notice of appeal of the Bankruptcy Court decision dismissing the complaint. Plaintiff has elected to have the appeal heard by the District Court, rather than the Bankruptcy Appellate Panel. Plaintiff filed a designation of the record and statement of the issues on April 20, 2020, and the Utility will have until May 4, 2020, 14 days thereafter, to file a designation of any additional items.
2015 GT&S Rate Case Disallowance of Capital Expenditures

On June 23, 2016, the CPUC approved a final phase one decision in the Utility’s 2015 GT&S rate case.  The phase one decision excluded from rate base $696 million of capital spending in 2011 through 2014 in excess of the amount adopted in the prior GT&S rate case. The decision permanently disallowed $120 million of that amount and ordered that the remaining $576 million be subject to an audit overseen by the CPUC staff, with the possibility that the Utility may seek recovery in a future proceeding. Additional charges may be required in the future based on the outcome of the CPUC’s audit of 2011 through 2014 capital spending. Capital disallowances are reflected in operating and maintenance expenses in the Condensed Consolidated Statements of Income.
Environmental Remediation Contingencies

The Utility’s environmental remediation liability is primarily included in non-current liabilities on the Condensed Consolidated Balance Sheets and is comprised of the following:
 Balance at
(in millions)March 31, 2020December 31, 2019
Topock natural gas compressor station$348  $362  
Hinkley natural gas compressor station133  138  
Former manufactured gas plant sites owned by the Utility or third parties (1)
667  568  
Utility-owned generation facilities (other than fossil fuel-fired),
  other facilities, and third-party disposal sites (2)
105  101  
Fossil fuel-fired generation facilities and sites (3)
104  106  
Total environmental remediation liability$1,357  $1,275  
(1) Primarily driven by the following sites: San Francisco Beach Street, Vallejo, and San Francisco East Harbor.
(2) Primarily driven by Geothermal landfill and Shell Pond site.
(3) Primarily driven by the San Francisco Potrero Power Plant.

The Utility’s gas compressor stations, former manufactured gas plant sites, power plant sites, gas gathering sites, and sites used by the Utility for the storage, recycling, and disposal of potentially hazardous substances are subject to requirements issued by the Environmental Protection Agency under the Federal Resource Conservation and Recovery Act in addition to other state hazardous waste laws.  The Utility has a comprehensive program in place designed to comply with federal, state, and local laws and regulations related to hazardous materials, waste, remediation activities, and other environmental requirements.  The Utility assesses and monitors the environmental requirements on an ongoing basis, and implements changes to its program as deemed appropriate. The Utility’s remediation activities are overseen by the DTSC, several California regional water quality control boards, and various other federal, state, and local agencies.

The Utility’s environmental remediation liability at March 31, 2020, reflects its best estimate of probable future costs for remediation based on the current assessment data and regulatory obligations. Future costs will depend on many factors, including the extent of work necessary to implement final remediation plans, the Utility’s time frame for remediation, and unanticipated claims filed against the Utility.  The Utility may incur actual costs in the future that are materially different than this estimate and such costs could have a material impact on results of operations, financial condition, and cash flows during the period in which they are recorded. At March 31, 2020, the Utility expected to recover $1,029 million of its environmental remediation liability for certain sites through various ratemaking mechanisms authorized by the CPUC. 

For more information, see remediation site descriptions below and see Note 15 of the Notes to the Consolidated Financial Statements in Item 8 of the 2019 Form 10-K.
Natural Gas Compressor Station Sites

The Utility is legally responsible for remediating groundwater contamination caused by hexavalent chromium used in the past at the Utility’s natural gas compressor stations. The Utility is also required to take measures to abate the effects of the contamination on the environment.
Topock Site

The Utility’s remediation and abatement efforts at the Topock site are subject to the regulatory authority of the California DTSC and the U.S. Department of the Interior. On April 24, 2018, the DTSC authorized the Utility to build an in-situ groundwater treatment system to convert hexavalent chromium into a non-toxic and non-soluble form of chromium. Construction activities began in October 2018 and will continue for several years. The Utility’s undiscounted future costs associated with the Topock site may increase by as much as $216 million if the extent of contamination or necessary remediation is greater than anticipated. The costs associated with environmental remediation at the Topock site are expected to be recovered primarily through the HSM, where 90% of the costs are recovered in rates.

Hinkley Site

The Utility has been implementing remediation measures at the Hinkley site to reduce the mass of the chromium plume in groundwater and to monitor and control movement of the plume. The Utility’s remediation and abatement efforts at the Hinkley site are subject to the regulatory authority of the California Regional Water Quality Control Board, Lahontan Region. In November 2015, the California Regional Water Quality Control Board, Lahontan Region adopted a clean-up and abatement order directing the Utility to contain and remediate the underground plume of hexavalent chromium and the potential environmental impacts. The final order states that the Utility must continue and improve its remediation efforts, define the boundaries of the chromium plume, and take other action. Additionally, the final order sets plume capture requirements, requires a monitoring and reporting program, and includes deadlines for the Utility to meet interim cleanup targets. The United States Geological Survey team is currently conducting a background study on the site to better define the chromium plume boundaries. A draft background report was received in January 2020 and is expected to be finalized in 2021. The Utility’s undiscounted future costs associated with the Hinkley site may increase by as much as $129 million if the extent of contamination or necessary remediation is greater than anticipated. The costs associated with environmental remediation at the Hinkley site will not be recovered through rates.
Former Manufactured Gas Plants

Former MGPs used coal and oil to produce gas for use by the Utility’s customers before natural gas became available. The by-products and residues of this process were often disposed of at the MGPs themselves. The Utility has a program to manage the residues left behind as a result of the manufacturing process; many of the sites in the program have been addressed. The Utility’s undiscounted future costs associated with MGP sites may increase by as much as $539 million if the extent of contamination or necessary remediation is greater than anticipated. The costs associated with environmental remediation at the MGP sites are recovered through the HSM, where 90% of the costs are recovered in rates.
Utility-Owned Generation Facilities and Third-Party Disposal Sites

Utility-owned generation facilities and third-party disposal sites often involve long-term remediation. The Utility’s undiscounted future costs associated with Utility-owned generation facilities and third-party disposal sites may increase by as much as $78 million if the extent of contamination or necessary remediation is greater than anticipated. The environmental remediation costs associated with the Utility-owned generation facilities and third-party disposal sites are recovered through the HSM, where 90% of the costs are recovered in rates.
Fossil Fuel-Fired Generation Sites

In 1998, the Utility divested its generation power plant business as part of generation deregulation. Although the Utility sold its fossil-fueled power plants, the Utility retained the environmental remediation liability associated with each site. The Utility’s undiscounted future costs associated with fossil fuel-fired generation sites may increase by as much as $80 million if the extent of contamination or necessary remediation is greater than anticipated. The environmental remediation costs associated with the fossil fuel-fired sites will not be recovered through rates.
Insurance
Wildfire Insurance

In 2018, PG&E Corporation and the Utility renewed their liability insurance coverage for wildfire events in an aggregate amount of approximately $1.4 billion for the period from August 1, 2018 through July 31, 2019, comprised of $700 million for general wildfire liability in policies covering wildfire and non-wildfire events (subject to an initial self-insured retention of $10 million per occurrence), and $700 million for wildfire property damages only, which included approximately $200 million of coverage through the use of a catastrophe bond. In 2020, PG&E Corporation and the Utility has liability insurance coverage for wildfire events in an amount of $430 million (subject to an initial self-insured retention of $10 million per occurrence) for the period of August 1, 2019 through July 31, 2020, and approximately $1 billion in liability insurance coverage for non-wildfire events (subject to an initial self-insured retention of $10 million per occurrence), comprised of $520 million for the period of August 1, 2019 through July 31, 2020 and $480 million for the period of September 3, 2019 through September 2, 2020. PG&E Corporation and the Utility continue to pursue additional insurance coverage. Various coverage limitations applicable to different insurance layers could result in uninsured costs in the future depending on the amount and type of damages resulting from covered events.

PG&E Corporation’s and the Utility’s cost of obtaining the wildfire and non-wildfire insurance coverage in place for the period of August 1, 2019 through September 2, 2020 is approximately $212 million, compared to the approximately $50 million that the Utility recovered in rates during the year ended December 31, 2019. The Utility has sought recovery of certain premium costs paid in excess of the amount the Utility currently is recovering from customers through the GRC period ended December 31, 2019. The Utility’s 2020 GRC settlement agreement includes a new two-way balancing account that would allow the Utility to pass through insurance premium costs for up to $1.4 billion in coverage. The Utility is unable to predict the timing and outcome of the 2020 GRC proceeding.

PG&E Corporation and the Utility record a receivable for insurance recoveries when it is deemed probable that recovery of a recorded loss will occur.  Through March 31, 2020, PG&E Corporation and the Utility recorded $1.38 billion for probable insurance recoveries in connection with the 2018 Camp fire and $843 million for probable insurance recoveries in connection with the 2017 Northern California wildfires. These amounts reflect an assumption that the cause of each fire is deemed to be a separate occurrence under the insurance policies.
Nuclear Insurance

The Utility maintains multiple insurance policies through NEIL and European Mutual Association for Nuclear Insurance, covering nuclear or non-nuclear events at the Utility’s two nuclear generating units at Diablo Canyon and the retired Humboldt Bay Unit 3.  If NEIL losses in any policy year exceed accumulated funds, the Utility could be subject to a retrospective assessment.  If NEIL were to exercise this assessment, as of the policy renewal on April 1, 2020, the maximum aggregate annual retrospective premium obligation for the Utility would be approximately $43 million.  If European Mutual Association for Nuclear Insurance losses in any policy year exceed accumulated funds, the Utility could be subject to a retrospective assessment of approximately $4 million, as of the policy renewal on April 1, 2020.  For more information about the Utility’s nuclear insurance coverage, see Note 15 of the Notes to the Consolidated Financial Statements in Item 8 of the 2019 Form 10-K. 
Tax Matters

PG&E Corporation’s and the Utility’s unrecognized tax benefits may change significantly within the next 12 months due to the resolution of audits.  As of March 31, 2020, it is reasonably possible that unrecognized tax benefits will decrease by approximately $40 million within the next 12 months. 

PG&E Corporation does not believe that the Chapter 11 Cases resulted in loss of or limitation on the utilization of any of the tax carryforwards. PG&E Corporation will continue to monitor the status of tax carryforwards during the pendency of the Chapter 11 Cases.

In March 2020, Congress passed, and the President signed into law the Coronavirus Aid, Relief and Economic Security (“CARES”) Act. Under the CARES Act, PG&E Corporation and the Utility expect to be able to defer the payment of 2020 payroll taxes for the remainder of the year to 2021 and 2022. PG&E Corporation and the Utility are currently evaluating the potential tax impact of these changes. PG&E Corporation will continue to monitor legislative activities.
Purchase Commitments

In the ordinary course of business, the Utility enters into various agreements to purchase power and electric capacity; natural gas supply, transportation, and storage; nuclear fuel supply and services; and various other commitments. At December 31, 2019, the Utility had undiscounted future expected obligations of approximately $38 billion. (See Note 15 of the Notes to the Consolidated Financial Statements in Item 8 of the 2019 Form 10-K.) The Utility has not entered into any new material commitments during the three months ended March 31, 2020.