Commitments and Contingencies (Planned Capital Expenditures) (Details) (USD $)
3 Months Ended
Mar. 31, 2013
MW
Planned Capital Expenditures [Line Items]  
Amount of long-term debt reclassified into current due to event of default $ 631,000,000
Amount of noncurrent derivative liability reclassified into current derivative liability due to event of default. 102,000,000
Remaining equity funding commitment related to Spain solar projects 40,000,000
Amount of debt outstanding under financing agreements related to Spain solar projects 653,000,000
Amount of gross derivative liability related to Spain solar projects 173,000,000
FPL [Member]
 
Planned Capital Expenditures [Line Items]  
2013 2,105,000,000 [1]
2014 2,755,000,000 [1]
2015 2,280,000,000 [1]
2016 2,160,000,000 [1]
2017 1,640,000,000 [1]
Total 10,940,000,000 [1]
Incremental Capital Expenditures Low Range 3,000,000,000
Incremental Capital Expenditures High Range 4,000,000,000
FPL [Member] | New Generation Expenditures [Member]
 
Planned Capital Expenditures [Line Items]  
2013 585,000,000 [2],[3],[4]
2014 760,000,000 [2],[3],[4]
2015 250,000,000 [2],[3],[4]
2016 175,000,000 [2],[3],[4]
2017 0 [2],[3],[4]
Total 1,770,000,000 [2],[3],[4]
Pre-construction costs and carrying charges (equal to a pretax AFUDC rate) - 2013 27,000,000
Pre-construction costs and carrying charges (equal to a pretax AFUDC rate) - 2014 17,000,000
FPL [Member] | Existing Generation Expenditures [Member]
 
Planned Capital Expenditures [Line Items]  
2013 525,000,000 [2]
2014 685,000,000 [2]
2015 650,000,000 [2]
2016 555,000,000 [2]
2017 530,000,000 [2]
Total 2,945,000,000 [2]
FPL [Member] | Transmission And Distribution Expenditures [Member]
 
Planned Capital Expenditures [Line Items]  
2013 620,000,000
2014 1,020,000,000
2015 1,065,000,000
2016 1,090,000,000
2017 770,000,000
Total 4,565,000,000
FPL [Member] | Nuclear Fuel Expenditures [Member]
 
Planned Capital Expenditures [Line Items]  
2013 225,000,000
2014 140,000,000
2015 210,000,000
2016 220,000,000
2017 225,000,000
Total 1,020,000,000
FPL [Member] | General And Other Expenditures [Member]
 
Planned Capital Expenditures [Line Items]  
2013 150,000,000
2014 150,000,000
2015 105,000,000
2016 120,000,000
2017 115,000,000
Total 640,000,000
FPL [Member] | Generation Expenditures [Member]
 
Planned Capital Expenditures [Line Items]  
Allowance for funds used during construction (AFUDC) - 2013 56,000,000
Allowance for funds used during construction (AFUDC) - 2014 55,000,000
Allowance for funds used during construction (AFUDC) - 2015 46,000,000
Allowance for funds used during construction (AFUDC) - 2016 26,000,000
NextEra Energy Resources [Member]
 
Planned Capital Expenditures [Line Items]  
2013 1,235,000,000
2014 520,000,000
2015 375,000,000
2016 385,000,000
2017 340,000,000
Total 2,855,000,000
NextEra Energy Resources [Member] | Nuclear Fuel Expenditures [Member]
 
Planned Capital Expenditures [Line Items]  
2013 225,000,000 [5]
2014 275,000,000 [5]
2015 250,000,000 [5]
2016 330,000,000 [5]
2017 285,000,000 [5]
Total 1,365,000,000 [5]
NextEra Energy Resources [Member] | Wind Expenditures [Member]
 
Planned Capital Expenditures [Line Items]  
2013 205,000,000 [6]
2014 45,000,000 [6]
2015 5,000,000 [6]
2016 5,000,000 [6]
2017 5,000,000 [6]
Total 265,000,000 [6]
Planned New Wind Generation To Be Added over 5 Years 300
Planned New Canadian Wind With Internal Approvals 125
Planned New Canadian Wind Generation Requiring Internal Approvals MW 470
Expected Cost of New Wind Projects Requiring Internal Approvals - Low End of Range 1,300,000,000
Expected Cost of New Wind Projects Requiring Internal Approvals - High End of Range 1,700,000,000
Planned US wind generation to be added in 2013 and 2014 in megawatts - Low end of range 500
Planned US wind generation to be added in 2013 and 2014 in megawatts - High end of range 1,500
Planned cost of US wind generation to be added in 2013 and 2014 - Low end of range 1,000,000,000
Planned cost of US wind generation to be added in 2013 and 2014 - High end of range 3,000,000,000
NextEra Energy Resources [Member] | Solar Expenditures [Member]
 
Planned Capital Expenditures [Line Items]  
2013 605,000,000 [7]
2014 155,000,000 [7]
2015 5,000,000 [7]
2016 0 [7]
2017 0 [7]
Total 765,000,000 [7]
Planned new solar generation over 5 year period (in megawatts) 645
Planned New Solar Capacity of Equity Method Investment 550
Planned new solar capacity of projects requiring internal approvals 250
Expected Cost of New Solar Projects Requiring Internal Approvals - Low End of Range 600,000,000
Expected Costs of New Solar Projects Requiring Internal Approval - High End of Range 800,000,000
Maximum Planned New Incremental Solar Generation Through 2016 in megawatts 300
Maximum Cost of Planned New Incremental Solar Generation Through 2016 1,000,000,000
NextEra Energy Resources [Member] | Other Expenditures [Member]
 
Planned Capital Expenditures [Line Items]  
2013 200,000,000 [8]
2014 45,000,000 [8]
2015 115,000,000 [8]
2016 50,000,000 [8]
2017 50,000,000 [8]
Total 460,000,000 [8]
Corporate and Other [Member]
 
Planned Capital Expenditures [Line Items]  
2013 85,000,000
2014 80,000,000
2015 70,000,000
2016 70,000,000
2017 70,000,000
Total $ 375,000,000
[1] FPL has identified $3 billion to $4 billion in potential incremental capital expenditures through 2016 in addition to what is included in the table above.
[2] Includes allowance for funds used during construction (AFUDC) of approximately $56 million, $55 million, $46 million and $26 million in 2013 through 2016, respectively.
[3] Consists of projects that have received FPSC approval. Includes pre-construction costs and carrying charges (equal to a fixed pretax AFUDC rate) on construction costs recoverable through the capacity clause of approximately $27 million and $17 million in 2013 and 2014, respectively. Excludes capital expenditures for the construction costs for the two additional nuclear units at FPL's Turkey Point site beyond what is required to receive an NRC license for each unit.
[4] Includes land, generating structures, transmission interconnection and integration and licensing.
[5] Includes nuclear fuel.
[6] Consists of capital expenditures for new wind projects and related transmission totaling approximately 300 mw, including approximately 125 mw in Canada, that have received applicable internal approvals. Excludes new Canadian wind projects requiring internal approvals with generation totaling approximately 470 mw in 2014 and 2015, with an estimated total cost of approximately $1.3 billion to $1.7 billion. NEER expects to add 500 to 1,500 mw of new U.S. wind generation through 2014 at a total cost of approximately $1 billion to $3 billion.
[7] Consists of capital expenditures for new solar projects and related transmission totaling 645 mw that have received applicable internal approvals, including equity contributions associated with a 50% equity investment in a 550 mw solar project. Excludes solar projects requiring internal approvals with generation totaling 250 mw with an estimated cost of approximately $600 million to $800 million. Additionally, NEER expects to add up to 300 mw of incremental solar generation at a cost of up to $1 billion through 2016.
[8] Consists of capital expenditures that have received applicable internal approvals.