XML 52 R22.htm IDEA: XBRL DOCUMENT v2.4.1.9
Environmental Matters
12 Months Ended
Dec. 31, 2014
Environmental Remediation Obligations [Abstract]  
Environmental Matters [Text Block]
15. ENVIRONMENTAL MATTERS

We own, or previously owned, properties that may require environmental remediation or action. We estimate the range of loss for environmental liabilities based on current remediation technology, enacted laws and regulations, industry experience gained at similar sites and an assessment of the probable level of involvement and financial condition of other potentially responsible parties. Due to the numerous uncertainties surrounding the course of environmental remediation and the preliminary nature of several site investigations, in some cases, we may not be able to reasonably estimate the high end of the range of possible loss. In those cases, we have disclosed the nature of the possible loss and the fact that the high end of the range cannot be reasonably estimated. Unless there is an estimate within a range of possible losses that is more likely than other cost estimates within that range, we record the liability at the low end of this range. It is likely that changes in these estimates and ranges will occur throughout the remediation process for each of these sites due to our continued evaluation and clarification concerning our responsibility, the complexity of environmental laws and regulations and the determination by regulators of remediation alternatives. 

In the 2012 Oregon general rate case, the SRRM mechanism was approved to recover the Company's
deferred environmental costs. The Commission ordered a separate docket to determine the prudence of deferred
costs, the allocation of insurance proceeds, and an earnings test that would be applied to past and future deferred costs. This separate docket was resolved in February 2015. See Note 16 for information regarding the resolution of this matter.

In Washington, the Company is authorized to defer environmental costs, if any, that are appropriately allocated to Washington customers. The cost recovery and carrying charges on amounts deferred for costs associated with services provided to Washington customers will be determined in a future proceeding. Annually, the Company reviews all regulatory assets for recoverability or more often if circumstances warrant. If we should determine all or a portion of these regulatory assets no longer meet the criteria for continued application of regulatory accounting, then we would be required to write off the net unrecoverable balances against earnings in the period such determination is made.

In December 2010, NW Natural commenced litigation against certain of its historical liability insurers in Multnomah County Circuit Court, State of Oregon. In February 2014, we settled with remaining defendant insurance companies and received additional payments of approximately $103 million. The Court dismissed the case on July 29, 2014. The Company has received total proceeds of approximately $150 million as a result of this litigation. The proceeds are recognized in regulatory accounts with the treatment determined under the SRRM. See Note 16.

Environmental Sites
The following table summarizes information regarding liabilities related to environmental sites, which are recorded in other current liabilities and other noncurrent liabilities on the balance sheet at December 31:
 
 
Current Liabilities
 
Non-Current Liabilities
In thousands
 
2014
 
2013
 
2014
 
2013
Portland Harbor site:
 
 
 
 
 
 
 
 
Gasco/Siltronic Sediments
 
$
1,767

 
$
1,278

 
$
38,019

 
$
37,954

Other Portland Harbor
 
1,934

 
1,766

 
4,338

 
3,478

Gasco Upland site
 
9,535

 
11,010

 
37,117

 
39,508

Siltronic Upland site
 
957

 
763

 
348

 
406

Central Service Center site
 
171

 
85

 

 
248

Front Street site
 
1,020

 
1,274

 
122

 
122

Oregon Steel Mills
 

 

 
179

 
179

Total
 
$
15,384

 
$
16,176

 
$
80,123

 
$
81,895



The following table presents information regarding the total amount of cash paid for environmental sites and the total regulatory asset deferred as of December 31:
In thousands
 
2014
 
2013
Cash paid(1)
 
$
113,740

 
$
98,817

Total regulatory asset deferral(2)
 
58,859

 
148,389


(1) 
Includes $20.4 million reclassified to utility plant on November 1, 2013 associated with the water treatment station of which a portion was paid during 2012 through 2014.
(2)
Includes cash paid, remaining liability, and interest, net of insurance reimbursement and amounts reclassified to utility plant for the water treatment station.

PORTLAND HARBOR SITE. The Portland Harbor is an Environmental Protection Agency (EPA) listed Superfund site that is approximately 10 miles long on the Willamette River and is adjacent to NW Natural's Gasco uplands and Siltronic uplands sites. We have been notified that we are a potentially responsible party to the Superfund site and we have joined with some of the other potentially responsible parties (the Lower Willamette Group or LWG) to develop a Portland Harbor Remedial Investigation/Feasibility Study (RI/FS). The LWG submitted a draft Feasibility Study (FS) to the EPA in March 2012 providing a range of remedial costs for the entire Portland Harbor Superfund Site, which includes the Gasco/Siltronic Sediment site, discussed below. The range of costs estimated for various remedial alternatives for the entire Portland Harbor, as provided in the draft FS, is $169 million to $1.8 billion. NW Natural's potential liability is a portion of the costs of the remedy the EPA will select for the entire Portland Harbor Superfund site. The cost of that remedy is expected to be allocated among more than 100 potentially responsible parties. NW Natural is participating in a non-binding allocation process in an effort to settle this potential liability. We manage our liability related to the Superfund site as two distinct remediation projects, the Gasco/Siltronic Sediments and Other Portland Harbor projects.

Gasco/Siltronic Sediments. In 2009, NW Natural and Siltronic Corporation entered into a separate Administrative Order on Consent with the EPA to evaluate and design specific remedies for sediments adjacent to the Gasco uplands and Siltronic uplands sites. NW Natural submitted a draft Engineering Evaluation/Cost Analysis (EE/CA) to the EPA in May 2012 to provide the estimated cost of potential remedial
alternatives for this site. At this time, the estimated costs for the various sediment remedy alternatives in the draft EE/CA as well as costs for the additional studies and design work needed before the clean-up can occur, and for regulatory oversight throughout the clean-up range from $39.8 million to $350 million. We have recorded a liability of $39.8 million for the sediment clean-up, which reflects the low end of the range. At this time, we believe sediments at this site represent the largest portion of our liability related to the Portland Harbor site, discussed above. 

Other Portland Harbor. NW Natural incurs costs related to its membership in the LWG which is performing the RI/FS for the EPA. NW Natural also incurs costs related to natural resource damages from these sites. The Company and other parties have signed a cooperative agreement with the Portland Harbor Natural Resource Trustee council to participate in a phased natural resource damage assessment to estimate liabilities to support an early restoration-based settlement of natural resource damage claims. Natural resource damage claims may arise only after a remedy for clean-up has been settled. We have accrued a liability for these claims which is at the low end of the range of the potential liability; the high end of the range cannot be reasonably estimated at this time. This liability is not included in the range of costs provided in the draft FS for the Portland Harbor and noted above.

GASCO UPLANDS SITE. NW Natural owns a former gas manufacturing plant that was closed in 1958 (Gasco site) and is adjacent to the Portland Harbor site described above. The Gasco site has been under investigation by us for environmental contamination under the ODEQ Voluntary Clean-Up Program. It is not included in the range of remedial costs for the Portland Harbor site noted above. We manage the Gasco site in two parts, the uplands portion and the groundwater source control action.
In May 2007, we completed a revised Remedial Investigation Report for the uplands portion and submitted it to ODEQ for review. We have recognized a liability for the remediation of the uplands portion of the site which is at the low end of the range of potential liability; the high end of the range cannot be reasonably estimated at this time.

In September 2013, we completed construction of a groundwater source control system, including a water treatment station, at the Gasco site. We are working with ODEQ on monitoring the effectiveness of the system and at this time it is unclear what, if any, additional actions ODEQ may require subsequent to the initial testing of the system or as part of the final remedy for the uplands portion of the Gasco site. We have estimated the cost associated with the ongoing operation of the system and have recognized a liability which is at the low end of the range of potential cost. We cannot estimate the high end of the range at this time due to the uncertainty associated with the duration of running the water treatment station, which is highly dependent on the remedy determined for both the upland portion as well as the final remedy for our Gasco sediment exposure.

Beginning November 1, 2013, capital asset costs of $19.0 million for the Gasco water treatment station were placed into rates with OPUC approval. The OPUC deemed these costs prudent. Beginning November 1, 2014, the OPUC approved the application of $2.5 million from insurance proceeds plus interest to reduce the total amount of Gasco capital costs to be recovered through rate base. A portion of these proceeds was noncash in 2014.

OTHER SITES. In addition to those sites above, we have environmental exposures at four other sites: Siltronic, Central Service Center, Front Street, and Oregon Steel Mills. Due to the uncertainty of the design of remediation, regulation, timing of the liabilities, and in the case of the Oregon Steel Mills site, pending litigation, liabilities for each of these sites have been recognized at their respective low end of the range of potential liability; the high end of the range could not be reasonably estimated as of December 31, 2014.

SILTRONIC UPLAND. A portion of the Siltronic property was formerly owned by NW Natural as part of the adjacent Gasco site. We are currently conducting an investigation of manufactured gas plant wastes on the uplands at this site for the ODEQ. 
 
Central Service Center site. We are currently performing an environmental investigation of the property under the ODEQ's Independent Cleanup Pathway. This site is on ODEQ's list of sites with confirmed releases of hazardous substances, and cleanup is necessary. 
 
Front Street site. The Front Street site was the former location of a gas manufacturing plant we operated. NW Natural is currently developing a feasibility study to support ODEQ's evaluation of potential clean-up alternatives.

Oregon Steel Mills site. See “Legal Proceedings,” below.
 
Legal Proceedings
NW Natural is subject to claims and litigation arising in the ordinary course of business. Although the final outcome of any of these legal proceedings cannot be predicted with certainty, including the matter described below, NW Natural does not expect that the ultimate disposition of any of these matters will have a material effect on our financial condition, results of operations or cash flows. See also Part I, Item 3, “Legal Proceedings.”

OREGON STEEL MILLS SITE. In 2004, NW Natural was served with a third-party complaint by the Port of Portland (the Port) in a Multnomah County Circuit Court case, Oregon Steel Mills, Inc. v. The Port of Portland. The Port alleges that in the 1940s and 1950s petroleum wastes generated by our predecessor, Portland Gas & Coke Company, and 10 other third-party defendants, were disposed of in a waste oil disposal facility operated by the United States or Shaver Transportation Company on property then owned by the Port and now owned by Oregon Steel Mills. The complaint seeks contribution for unspecified past remedial action costs incurred by the Port regarding the former waste oil disposal facility as well as a declaratory judgment allocating liability for future remedial action costs. No date has been set for trial. Although the final outcome of this proceeding cannot be predicted with certainty, we do not expect the ultimate disposition of this matter will have a material effect on our financial condition, results of operations or cash flows.