XML 50 R16.htm IDEA: XBRL DOCUMENT v2.4.0.6
Commitments and Contingencies
6 Months Ended
Jun. 30, 2012
Commitments and Contingencies [Abstract]  
Commitments and Contingencies
6.
Commitments and Contingencies
 
Except to the extent noted below and in Note 5, the circumstances set forth in Notes 12, 13 and 14 to the consolidated financial statements included in Xcel Energy Inc.'s Annual Report on Form 10-K for the year ended Dec. 31, 2011, appropriately represent, in all material respects, the current status of commitments and contingent liabilities, including those regarding public liability for claims resulting from any nuclear incident, and are incorporated herein by reference.  The following include commitments, contingencies and unresolved contingencies that are material to Xcel Energy's financial position.

Purchased Power Agreements

Under certain purchased power agreements, NSP-Minnesota, PSCo and SPS purchase power from independent power producing entities that own natural gas or biomass fueled power plants for which the utility subsidiaries are required to reimburse natural gas or biomass fuel costs, or to participate in tolling arrangements under which the utility subsidiaries procure the natural gas required to produce the energy that they purchase.  These specific purchased power agreements create a variable interest in the associated independent power producing entity.

Xcel Energy had approximately 3,773 megawatts (MW) of capacity under long-term purchased power agreements as of June 30, 2012 and Dec. 31, 2011 with entities that have been determined to be variable interest entities.  Xcel Energy has concluded that these entities are not required to be consolidated in its consolidated financial statements because it does not have the power to direct the activities that most significantly impact the entities' economic performance.  These agreements have expiration dates through the year 2033.

Guarantees and Indemnifications
 
Xcel Energy Inc. and its subsidiaries provide guarantees and bond indemnities under specified agreements or transactions.  The guarantees and bond indemnities issued by Xcel Energy Inc. guarantee payment or performance by its subsidiaries.  As a result, Xcel Energy Inc.'s exposure under the guarantees and bond indemnities is based upon the net liability of the relevant subsidiary under the specified agreements or transactions.  Most of the guarantees and bond indemnities issued by Xcel Energy Inc. and its subsidiaries limit the exposure to a maximum amount stated in the guarantees and bond indemnities.  As of June 30, 2012 and Dec. 31, 2011, Xcel Energy Inc. and its subsidiaries have no assets held as collateral related to their guarantees, bond indemnities and indemnification agreements.

The following table presents guarantees and bond indemnities issued and outstanding for Xcel Energy Inc.:

(Millions of Dollars)
 
June 30, 2012
  
Dec. 31, 2011
 
Guarantees issued and outstanding
 $68.4  $67.5 
Current exposure under these guarantees
  17.9   18.0 
Bonds with indemnity protection
  30.0   31.2 
 
Indemnification Agreements

In connection with the acquisition of the 201 MW Nobles wind project in 2011, NSP-Minnesota agreed to indemnify the seller for losses arising out of a breach of certain representations and warranties.  NSP-Minnesota's indemnification obligation is capped at $20 million, in the aggregate, at June 30, 2012 and Dec. 31, 2011.  The indemnification obligation expires in March 2013.  NSP-Minnesota has not recorded a liability related to this indemnity at June 30, 2012 or Dec. 31, 2011.

In connection with the acquisition of 900 MW of natural gas-fired generation from subsidiaries of Calpine Development Holdings Inc. in 2010, PSCo agreed to indemnify the seller for losses arising out of a breach of certain representations and warranties.  The aggregate liability for PSCo pursuant to these indemnities is not subject to a capped dollar amount.  The indemnification obligation expires in December 2012.  PSCo has not recorded a liability related to this indemnity at June 30, 2012 or Dec. 31, 2011.

Xcel Energy Inc. and its subsidiaries provide other indemnifications through contracts entered into in the normal course of business.  These are primarily indemnifications against adverse litigation outcomes in connection with underwriting agreements, as well as breaches of representations and warranties, including due organization, transaction authorization and income tax matters with respect to assets sold.  Xcel Energy Inc.'s and its subsidiaries' obligations under these agreements may be limited in terms of time and amount.  The maximum potential amount of future payments under these indemnifications cannot be reasonably estimated as the obligated amounts of these indemnifications often are not explicitly stated.

Environmental Contingencies

MGP Sites

Ashland MGP Site - NSP-Wisconsin has been named a potentially responsible party (PRP) for contamination at a site in Ashland, Wis.  The Ashland/Northern States Power Lakefront Superfund Site (the Ashland site) includes property owned by NSP-Wisconsin, which was a site previously operated by a predecessor company as a MGP facility (the Upper Bluff), and two other properties: an adjacent city lakeshore park area (Kreher Park), on which an unaffiliated third party previously operated a sawmill and conducted creosote treating operations; and an area of Lake Superior's Chequamegon Bay adjoining the park (the Sediments).

The U.S. Environmental Protection Agency (EPA) issued its Record of Decision (ROD) in September 2010, which documents the remedy that the EPA has selected for the cleanup of the Ashland site.  In April 2011, the EPA issued special notice letters identifying several entities, including NSP-Wisconsin, as PRPs, for future remediation at the site.  The special notice letters requested that those PRPs participate in negotiations with the EPA regarding how the PRPs intended to conduct or pay for the remediation.  As a result of those settlement negations, the EPA agreed to segment the Ashland site into separate areas.  The first area (Phase I Project Area) includes soil and groundwater in Kreher Park and the Upper Bluff.  The second area includes the Sediments.

In June 2012, a settlement in principle (Settlement) was reached among the EPA, the Wisconsin Department of Natural Resources (WDNR), the Bad River and Red Cliff Bands of the Lake Superior Tribe of Chippewa Indians and NSP-Wisconsin which, if it becomes effective, would resolve claims against NSP-Wisconsin for its alleged responsibility for the remediation of the Phase I Project Area.  Under the terms of the proposed Settlement, NSP-Wisconsin agrees to perform the remediation of the Phase I Project Area, but does not admit any liability with respect to the Ashland site.  The proposed Settlement reflects a cost estimate for the clean up of the Phase I Project Area of $40 million.  The proposed Settlement also would resolve claims by the federal, state and tribal trustees against NSP-Wisconsin for alleged natural resource damages at the Ashland site, including both the Phase I Project Area and the Sediments.  As part of the proposed Settlement, NSP-Wisconsin would convey approximately 1,390 acres of land to the State of Wisconsin and tribes so that they may manage and preserve the natural resource benefits associated with those properties.

Once the proposed Settlement is executed by all parties, a consent decree reflecting this settlement will be lodged with the U.S. District Court for the Western District of Wisconsin, pending solicitation of public notice and comment.  Following a 30-day public comment period, if no material adverse comments are received, the U.S. District Court would be expected to enter the consent decree as a final order, at which time it and the terms of the Settlement will become effective.  While it is expected that the consent decree will be signed, there are no assurances that the consent decree will be fully executed by all parties and ultimately entered as a final order.

Negotiations between the EPA and NSP-Wisconsin regarding who will pay or perform the cleanup of the Sediments are ongoing.  The EPA's ROD for the Ashland site estimates that the cost of the preferred remediation related to the Sediments is between $63.3 million and $77.1 million, with a potential deviation in such estimated costs of up to 50 percent higher to 30 percent lower.
 
At each of June 30, 2012 and Dec. 31, 2011, NSP-Wisconsin had recorded a liability of $104.3 million for the Ashland site based upon potential remediation and design costs together with estimated outside legal and consultant costs; of which $26.6 million was considered a current liability.  NSP-Wisconsin's potential liability, the actual cost of remediation and the time frame over which the amounts may be paid are subject to change until after negotiations or litigation with the EPA and other PRPs are fully resolved.  NSP-Wisconsin also continues to work to identify and access state and federal funds to apply to the ultimate remediation cost of the entire site.  Unresolved issues or factors that could result in higher or lower NSP-Wisconsin remediation costs for the Ashland site include, but are not limited to, the cleanup approach implemented for the Sediments, which party implements the cleanup, the timing of when the cleanup is implemented, the contributions, if any, by other PRPs and whether federal or state funding may be directed to help offset remediation costs at the Ashland site.

NSP-Wisconsin has deferred, as a regulatory asset, the estimated site remediation costs to date less insurance and rate recoveries, based on an expectation that the PSCW will continue to allow NSP-Wisconsin to recover payments for environmental remediation from its customers.  The PSCW has consistently authorized in NSP-Wisconsin rates recovery of all remediation costs incurred at the Ashland site, and has authorized recovery of MGP remediation costs by other Wisconsin utilities.  External MGP remediation costs are subject to deferral in the Wisconsin retail jurisdiction and are reviewed for prudence as part of the Wisconsin retail rate case process.  Under an existing PSCW policy with respect to recovery of remediation costs for MGPs, utilities have recovered remediation costs in natural gas rates, amortized over a four- to six-year period.  The PSCW has not allowed utilities to recover their carrying costs on unamortized regulatory assets for MGP remediation.  In a recent rate case decision, the PSCW recognized the potential magnitude of the future liability for, and circumstances of, the cleanup at the Ashland site and indicated it may consider alternatives to its established MGP site cleanup cost accounting and cost recovery guidelines for the Ashland site in a future proceeding.  Pursuant to the PSCW decision, NSP-Wisconsin proposed an alternative long-term plan to recover costs related to the Ashland site in the rate case application filed on June 1, 2012.  As compared to the current cost recovery policy, NSP-Wisconsin's alternative proposal mitigates the rate impact to natural gas customers and allows for partial recovery of carrying costs.

NSP-Wisconsin expects a decision on the alternative cost recovery plan by the end of 2012.

Other MGP Sites- Xcel Energy is currently involved in investigating and/or remediating several other MGP sites where hazardous or other regulated materials may have been deposited.  Xcel Energy has identified eight sites where former MGP activities have or may have resulted in actual site contamination and are under current investigation and/or remediation.  At some or all of these MGP sites, there are other parties that may have responsibility for some portion of any ultimate remediation that may be conducted.  Xcel Energy anticipates that the majority of the remediation at these sites will continue through at least 2014.  For these sites, Xcel Energy had accrued $4.0 million and $3.9 million at June 30, 2012 and Dec. 31, 2011, respectively.  There may be insurance recovery and/or recovery from other PRPs that will offset any costs actually incurred at these sites.  Xcel Energy anticipates that any amounts actually spent will be fully recovered from customers.

Environmental Requirements

Greenhouse Gas (GHG) New Source Performance Standard Proposal (NSPS) and Emission Guideline for Existing Sources - In April 2012, the EPA proposed a GHG NSPS for newly constructed power plants.  The proposal requires that carbon dioxide (CO2) emission rates be equal to those achieved by a natural gas combined-cycle plant, even if the plant is coal-fired.  The EPA also proposed that NSPS not apply to modified or reconstructed existing power plants and noted that, pursuant to its general NSPS regulations, installation of control equipment on existing plants would not constitute a "modification" to those plants under the NSPS program.  Xcel Energy submitted comments on the proposed GHG NSPS in June 2012.  It is not possible to evaluate the impact of this regulation until its final requirements are known.

The EPA also plans to propose GHG regulations applicable to emissions from existing power plants under the Clean Air Act (CAA).  It is not known when the EPA will propose new standards for existing sources.

New Mexico GHG Regulations - In 2010, the New Mexico Environmental Improvement Board (EIB) adopted two regulations to limit GHG emissions, including CO2 emissions from power plants and other industrial sources.  In July 2011, SPS and other parties filed a petition to repeal each GHG rule with the EIB.  The EIB repealed both regulations in the first quarter of 2012.

Western Resource Advocates and New Energy Economy, Inc. have since filed appeals with the New Mexico Court of Appeals to challenge each of the EIB's decisions to repeal the two GHG rules.  SPS has been granted intervention in one of the appeals and filed a petition to intervene in the other appeal, which has not yet been acted upon by the New Mexico Court of Appeals.
 

In late 2010 and early 2011, SPS, other utilities and industry groups filed separate appeals with the New Mexico Court of Appeals challenging the validity of the adoption of these two GHG regulations.  These appeals were stayed pending the EIB's consideration of the petitions for repeal of both rules.  In July 2012, the New Mexico Court of Appeals conditionally dismissed both appeals without prejudice.  These appeals are subject to reinstatement if the New Mexico Court of Appeals reverses the EIB's repeal of either rule and if the originally adopted rule is revived.

Cross-State Air Pollution Rule (CSAPR)- In July 2011, the EPA issued its CSAPR to address long range transport of particulate matter (PM) and ozone by requiring reductions in sulfur dioxide (SO2) and nitrogen oxide (NOx) from utilities located in the eastern half of the United States.  For Xcel Energy, the rule applies to Minnesota, Wisconsin and Texas.  The CSAPR sets more stringent requirements than the proposed Clean Air Transport Rule and specifically requires plants in Texas to reduce their SO2 and annual NOx emissions.  The rule also creates an emissions trading program.

On Dec. 30, 2011, the U.S. Court of Appeals for the District of Columbia Circuit (D.C. Circuit) issued a stay of the CSAPR, pending completion of judicial review.  Oral arguments in the case were held in April 2012 and it is anticipated the D.C. Circuit will rule on the challenges to the CSAPR during the summer of 2012.  It is not known at this time whether the CSAPR will be upheld, reversed or will require modifications pursuant to a future D.C. Circuit decision.

If the CSAPR is upheld and unmodified, Xcel Energy believes that the CSAPR could ultimately require the installation of additional emission controls on some of SPS' coal-fired electric generating units.  If compliance is required in a short time frame, SPS may be required to redispatch its system to reduce coal plant operating hours in order to decrease emissions from its facilities prior to the installation of emission controls.  The expected cost for these scenarios may vary significantly and SPS has estimated capital expenditures of approximately $470 million over the next five years for the plant modifications related to the CSAPR requirements.  SPS believes the cost of any required capital investment or possible increased fuel costs would be recoverable from customers through regulatory mechanisms and does not expect a material impact on its results of operations, financial position or cash flows.  In April 2012, SPS appealed to the D.C. Circuit on a final rule that the EPA issued that made changes to certain allowance allocations under the CSAPR.  While this rule increases the allowance allocations for SO2 for SPS, it did not increase them by as much as the proposed rule.  SPS is seeking additional allowance allocations through this appeal, which, if successful, would reduce SPS' costs to comply with the CSAPR.  The D.C. Circuit held this appeal in abeyance until it issues its decision.

If the CSAPR is upheld and unmodified, NSP-Minnesota would likely utilize a combination of emissions reductions through upgrades to its existing SO2 control technology at Sherco Units 1 and 2, which is estimated to cost a total of $10 million through 2014, and system operating changes to Black Dog and Sherco Units 1 and 2.  Costs for the Sherco Units 1 and 2 SO2 control technology are discussed below in the regional haze rules as SO2 reductions are part of the compliance plan for both the CSAPR and the regional haze rules.  If available, NSP-Minnesota would also consider allowance purchases.  In addition, NSP-Minnesota has filed a petition for reconsideration with the EPA and a petition for review of the CSAPR with the D.C. Circuit seeking the allocation of additional emission allowances to NSP-Minnesota.  NSP-Minnesota contends that the EPA's method of allocating allowances arbitrarily resulted in fewer allowances for its Riverside and High Bridge plants than should have been awarded to reflect their operations during the baseline period, which included coal-fired operations prior to their conversion to natural gas.  In April 2012, NSP-Minnesota appealed to the D.C. Circuit on a final rule that the EPA issued that made changes to certain allowance allocations under the CSAPR, seeking to secure additional allocations for its Riverside and High Bridge plants.  If successful, additional allowances would reduce NSP-Minnesota's costs to comply with the CSAPR.  The D.C. Circuit held this appeal in abeyance until it issues its decision.

If the CSAPR is upheld and unmodified, NSP-Wisconsin would likely make a combination of system operating changes and allowance purchases.  NSP-Wisconsin estimates the cost of compliance would be $0.2 million, and expects the cost of any required capital investment will be recoverable from customers.

Electric Generating Unit (EGU) Mercury and Air Toxics Standards (MATS) Rule - The final EGU MATS rule became effective April 2012.  The EGU MATS rule sets emission limits for acid gases, mercury and other hazardous air pollutants and requires coal-fired utility facilities greater than 25 MW to demonstrate compliance within three to four years of the effective date.  Xcel Energy believes these costs will be recoverable through regulatory mechanisms and does not expect a material impact on results of operations, financial position or cash flows.

Regional Haze Rules - In 2005, the EPA finalized amendments to its regional haze rules regarding provisions that require the installation and operation of emission controls, known as best available retrofit technology (BART), for industrial facilities emitting air pollutants that reduce visibility in certain national parks and wilderness areas throughout the United States.  Xcel Energy generating facilities in several states are subject to BART requirements.  Individual states were required to identify the facilities located in their states that will have to reduce SO2, NOx and PM emissions under BART and then set emissions limits for those facilities.
 
PSCo
In 2006, the Colorado Air Quality Control Commission (CAQCC) promulgated BART regulations requiring certain major stationary sources to evaluate, install, operate and maintain BART to make reasonable progress toward meeting the national visibility goal.  In January 2011, the CAQCC approved a revised regional haze BART state implementation plan (SIP) incorporating the Colorado CACJA emission reduction plan, which will satisfy regional haze requirements.  In March 2012, the EPA proposed to approve the Colorado SIP, including the CACJA emission reduction plan for PSCo, as satisfying BART requirements.  The emission controls are expected to be installed between late 2012 and 2017.  PSCo expects the cost of any required capital investment will be recoverable from customers through the CACJA emission reduction plan recovery mechanisms or other regulatory mechanisms.

In March 2010, two environmental groups petitioned the U.S. Department of the Interior (DOI) to certify that 12 coal-fired boilers and one coal-fired cement kiln in Colorado are contributing to visibility problems in Rocky Mountain National Park.  The following PSCo plants are named in the petition:  Cherokee, Hayden, Pawnee and Valmont.  The groups allege that the Colorado BART rule is inadequate to satisfy the CAA mandate of ensuring reasonable further progress towards restoring natural visibility conditions in the park.  It is not known when the DOI will rule on the petition.

NSP-Minnesota
In December 2009, the Minnesota Pollution Control Agency (MPCA) approved the regional haze SIP, which has been submitted to the EPA for approval.  The MPCA selected the BART controls for Sherco Units 1 and 2 to improve visibility in the national parks.  The MPCA concluded Selective Catalytic Reduction (SCR) should not be required because the minor visibility benefits derived from SCRs do not outweigh the substantial costs.  The MPCA's BART controls for Sherco Units 1 and 2 consist of combustion controls for NOx and scrubber upgrades for SO2.  The combustion controls have been installed on Sherco Units 1 and 2, and the scrubber upgrades are scheduled to be installed by 2015.  At this time, the estimated cost for meeting the BART, regional haze and other CAA requirements is approximately $50 million, of which $20 million has already been spent on projects to reduce NOx emissions on Sherco Units 1 and 2.  Xcel Energy anticipates that all costs associated with BART compliance will be fully recoverable through regulatory recovery mechanisms.

In June 2011, the EPA provided comments to the MPCA on the SIP, stating that the EPA's preliminary review indicates that SCR controls should be added to Sherco Units 1 and 2.  The MPCA has since proposed that the CSAPR should be considered BART for EGUs and the EPA proposed that states be allowed to find that CSAPR compliance meets BART requirements for EGUs, and specifically that Minnesota's proposal to find the CSAPR to meet BART requirements should be approved, if finalized by the state.

In April 2012, the MPCA approved a supplement to the 2009 regional haze SIP finding that the CSAPR meets BART for EGUs in Minnesota.  The supplement also made a source-specific BART determination for Sherco Units 1 and 2 that requires installation of the combustion controls for NOx and scrubber upgrades for SO2 by January 2015.  In May 2012, the EPA adopted a final rule that allows states to determine whether CSAPR compliance meets BART requirements.  In June 2012, the EPA issued its final approval of the Minnesota SIP for EGUs.

In addition to the regional haze rules identified in the EPA's visibility program, and addressed in the MPCA's SIP discussed above, there are other visibility rules related to a program called the Reasonably Attributable Visibility Impairment (RAVI) program.  In October 2009, the DOI certified that a portion of the visibility impairment in Voyageurs and Isle Royale National Parks is reasonably attributable to emissions from NSP-Minnesota's Sherco Units 1 and 2.  The EPA is required to make its own determination as to whether Sherco Units 1 and 2 cause or contribute to RAVI and, if so, whether the level of controls required by the MPCA is appropriate.  The EPA plans to issue a separate notice on the issue of BART for Sherco Units 1 and 2 under the RAVI program.  It is not yet known when the EPA will publish a proposal under RAVI, or what that proposal will entail.  In May 2012, a notice of intent to sue was filed with the EPA by the following organizations: National Parks Conservation Association, Minnesota Center for Environmental Advocacy, Friends of the Boundary Waters Wilderness, Voyagers National Park Association, Fresh Energy and Sierra Club.  The notice advised the EPA of the parties' intent to sue the EPA in 180 days to attempt to require the EPA to determine BART for the Sherco Units 1 and 2 under the RAVI program.  It is not yet known how the EPA intends to respond to this notice.

SPS
Harrington Units 1 and 2 are potentially subject to BART.  Texas has developed a regional haze SIP that finds the Clean Air Interstate Rule (CAIR) equal to BART for EGUs, and as a result, no additional controls for these units beyond the CAIR compliance would be required.  In May 2012, the EPA deferred its review of the Texas SIP in its final rule allowing states to find that CSAPR compliance meets BART requirements for EGUs.
 
Revisions to National Ambient Air Quality Standards (NAAQS) for PM - In June 2012, the EPA proposed to lower the primary (health-based) NAAQS for annual average fine PM and to retain the current daily standard for fine PM.  In areas in which Xcel Energy operates power plants, current monitored air concentrations are below the range of the proposed annual primary standard.  The EPA also proposed to add a secondary (welfare-based) NAAQS to improve visibility, primarily in urban areas.  Xcel Energy expects the proposed visibility standard would likely be met where Xcel Energy operates power plants based on currently available information.  A final rule is expected in December 2012 and the EPA is expected to designate non-compliant locations by December 2014.  If such areas are identified, states would then study the sources of the nonattainment and make emission reduction plans to attain the standards.  It is not possible to evaluate the impact of this regulation further until its final requirements are known.

Legal Contingencies

Lawsuits and claims arise in the normal course of business.  Management, after consultation with legal counsel, has recorded an estimate of the probable cost of settlement or other disposition.  The ultimate outcome of these matters cannot presently be determined.  Accordingly, the ultimate resolution of these matters could have a material effect on Xcel Energy's consolidated financial position, results of operations, and cash flows.

Environmental Litigation

Native Village of Kivalina vs. Xcel Energy Inc. et al. - In February 2008, the City and Native Village of Kivalina, Alaska, filed a lawsuit in U.S. District Court for the Northern District of California against Xcel Energy and 23 other utility, oil, gas and coal companies.  Plaintiffs claim that defendants' emission of CO2 and other GHGs contribute to global warming, which is harming their village.  Xcel Energy believes the claims asserted in this lawsuit are without merit and joined with other utility defendants in filing a motion to dismiss in June 2008.  In October 2009, the U.S. District Court dismissed the lawsuit on constitutional grounds.  In November 2009, plaintiffs filed a notice of appeal to the U.S. Court of Appeals for the Ninth Circuit (Ninth Circuit).  In November 2011, oral arguments were presented.  It is unknown when the Ninth Circuit will render a final opinion.  The amount of damages claimed by plaintiffs is unknown, but likely includes the cost of relocating the village of Kivalina.  Plaintiffs' alleged relocation is estimated to cost between $95 million to $400 million.  While Xcel Energy believes the likelihood of loss is remote, given the nature of this case and any surrounding uncertainty, it could potentially have a material impact on Xcel Energy's consolidated results of operations, cash flows or financial position.  No accrual has been recorded for this matter.

Comer vs. Xcel Energy Inc. et al. - In May 2011, less than a year after their initial lawsuit was dismissed, plaintiffs in this purported class action lawsuit filed a second lawsuit against more than 85 utility, oil, chemical and coal companies in U.S. District Court in Mississippi.  The complaint alleges defendants' CO2 emissions intensified the strength of Hurricane Katrina and increased the damage plaintiffs purportedly sustained to their property.  Plaintiffs base their claims on public and private nuisance, trespass and negligence.  Among the defendants named in the complaint are Xcel Energy Inc., SPS, PSCo, NSP-Wisconsin and NSP-Minnesota.  The amount of damages claimed by plaintiffs is unknown.  The defendants, including Xcel Energy Inc., believe this lawsuit is without merit and filed a motion to dismiss the lawsuit.  In March 2012, the U.S. District Court granted this motion for dismissal.  In April 2012, plaintiffs appealed this decision to the U.S. Court of Appeals for the Fifth Circuit.  While Xcel Energy believes the likelihood of loss is remote, given the nature of this case and any surrounding uncertainty, it could potentially have a material impact on Xcel Energy's consolidated results of operations, cash flows or financial position.  No accrual has been recorded for this matter.

Employment, Tort and Commercial Litigation

Merricourt Wind Project Litigation - In April 2011, NSP-Minnesota terminated its agreements with enXco Development Corporation (enXco) for the development of a 150 MW wind project in southeastern North Dakota.  NSP-Minnesota's decision to terminate the agreements was based in large part on the adverse impact this project could have on endangered or threatened species protected by federal law and the uncertainty in cost and timing in mitigating this impact.  NSP-Minnesota also terminated the agreements due to enXco's nonperformance of certain other conditions, including failure to obtain a Certificate of Site Compatibility and the failure to close on the contracts by an agreed upon date of March 31, 2011.  NSP-Minnesota recorded a $101 million deposit in the first quarter of 2011, which was collected in April 2011.  In May 2011, NSP-Minnesota filed a declaratory judgment action in U.S. District Court in Minnesota to obtain a determination that it acted properly in terminating the agreements and enXco also filed a separate lawsuit in the same court seeking, among other things, in excess of $240 million for an alleged breach of contract.  NSP-Minnesota believes enXco's lawsuit is without merit and filed a motion to dismiss.  In September 2011, the U.S. District Court denied the motion to dismiss.  The trial is set to begin in late 2012 or early 2013.  While Xcel Energy believes the likelihood of loss is remote, given the nature of this case and any surrounding uncertainty, it could potentially have a material impact on Xcel Energy's consolidated results of operations, cash flows or financial position.  No accrual has been recorded for this matter.
 
Exelon Wind (formerly John Deere Wind) Complaint - Four lawsuits and a regulatory petition have been filed arising out of a dispute concerning SPS' payments for energy produced from the John Deere Wind Energy subsidiaries' (JD Wind) projects.

State Lawsuit Regarding the PUCT's May 2009 Order
The first lawsuit was filed in June 2009 in Texas State District Court against the Public Utility Commission of Texas (PUCT).  In this lawsuit, JD Wind filed a petition seeking review of a May 2009 PUCT order denying JD Wind's request for relief against SPS.  In April 2011, JD Wind filed a non-suit of this case dropping the state appeal of the PUCT order.

Federal Lawsuit Regarding the PUCT's May 2009 Order
A second lawsuit was filed in December 2009 by JD Wind against the PUCT in U.S. District Court for the Western District of Texas.  This lawsuit was filed shortly after a declaratory order issued by the FERC stated that the PUCT's May 2009 order is not consistent with the FERC's regulations.  In this lawsuit, JD Wind seeks declaratory and injunctive relief against the PUCT.  The U.S. District Court issued an order preventing this lawsuit from proceeding pending the outcome of the Texas State District Court proceeding against the PUCT.  As a result of the non-suit of the Texas State District Court proceeding, this case has moved forward.  In March and June 2012, the U.S. District Court heard oral arguments on motions and cross motions for summary judgment, and took the motions under advisement.  If the U.S. District Court does not grant one of these dispositive motions, the case will proceed with a trial date in October 2013 at the earliest.

State Lawsuit Regarding Disputed Energy Payments
In January 2010, a third lawsuit was filed by JD Wind against SPS in Texas State District Court related to payments made by SPS for energy produced from the JD Wind projects.  On April 12, 2012, the Texas State District Court heard oral arguments on SPS' motion to dismiss and took the motion under advisement.  As the damages sought are indeterminate and given the uncertainty surrounding the circumstances of this case, Xcel Energy is unable to estimate the range or amount of possible damages.  No accrual has been recorded for this lawsuit nor is it expected that this proceeding will have a material effect on Xcel Energy's consolidated results of operations, cash flows or financial position.

Petition Regarding the PUCT's Approval of SPS' Revised Qualifying Facilities Tariff
In November 2010, JD Wind filed a petition in Texas State District Court seeking review of the PUCT's approval of SPS' revised tariff applicable to purchases of non-firm energy from qualifying facilities.  The PUCT has denied all allegations contained in this petition.  A hearing is scheduled for Sept. 6, 2012.  On June 29, 2012, Exelon Wind filed a complaint with the FERC against the PUCT raising essentially the same alleged violations of federal law as those presented in the petition filed in November 2010.  On July 30, 2012, the PUCT filed an answer to this complaint defending its order and SPS filed an intervention and protest in support of the PUCT's order.

State Lawsuit Regarding Wind Facility Registration with Southwest Power Pool (SPP)
On April 3, 2012, SPS filed a lawsuit against Exelon Wind in Texas State District Court to enforce Exelon Wind's contractual obligation to register its wind facilities with SPP effective April 1, 2012.  SPS is not seeking monetary damages in this lawsuit.  Instead, SPS intends to withhold certain payments to Exelon Wind pending the outcome of this lawsuit.  On May 7, 2012, Exelon Wind filed a counter-claim seeking recovery of the payments withheld by SPS.  A procedural schedule has not yet been established.  For the period April 1, 2012 to June 20, 2012, Xcel Energy has accrued approximately $2 million, which is subject to adjustments as the amount, if any, owed to Exelon Wind will be a litigated issue in this lawsuit.  This lawsuit is not expected to have a material effect on Xcel Energy's consolidated results of operations, cash flows or financial position.

Registration Agreement Filed by SPP with the FERC
On June 21, 2012, the FERC conditionally accepted SPP's filing of an unsigned Market Participation Agreement between SPP and Exelon covering Exelon's wind facilities.