Commitments and Contingencies
12 Months Ended
Dec. 31, 2022
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies
Legal
Xcel Energy is involved in various litigation matters in the ordinary course of business. The assessment of whether a loss is probable or is a reasonable possibility, and whether the loss or a range of loss is estimable, often involves a series of complex judgments about future events. Management maintains accruals for losses probable of being incurred and subject to reasonable estimation. 
Management is sometimes unable to estimate an amount or range of a reasonably possible loss in certain situations, including but not limited to when (1) the damages sought are indeterminate, (2) the proceedings are in the early stages, or (3) the matters involve novel or unsettled legal theories.
In such cases, there is considerable uncertainty regarding the timing or ultimate resolution, including a possible eventual loss. For current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, would have a material effect on Xcel Energy’s consolidated financial statements. Legal fees are generally expensed as incurred.
Gas Trading Litigation e prime is a wholly owned subsidiary of Xcel Energy. e prime was in the business of natural gas trading and marketing but has not engaged in natural gas trading or marketing activities since 2003. Multiple lawsuits involving multiple plaintiffs seeking monetary damages were commenced against e prime and its affiliates, including Xcel Energy, between 2003 and 2009 alleging fraud and anticompetitive activities in conspiring to restrain the trade of natural gas and manipulate natural gas prices. Cases were all consolidated in the U.S. District Court in Nevada.
One case remains active which includes a multi-district litigation matter consisting of a Wisconsin purported class (Arandell Corp.). The Court issued a ruling on June 30, 2022 granting plaintiffs’ class certification. Defendants will work together to prepare and file a petition appealing the class certification ruling to the Seventh Circuit. Xcel Energy has concluded that a loss is remote for the remaining lawsuit.
Comanche Unit 3 Litigation In 2021, CORE filed a lawsuit in Denver County District Court, alleging PSCo breached ownership agreement terms by failing to operate Comanche Unit 3 in accordance with prudent utility practices. In January 2022, the Court granted PSCo’s motion to dismiss CORE’s claims for unjust enrichment, declaratory judgment and damages for replacement power costs. In April 2022, CORE filed a supplement to include the January 2022 outage and damages related to this event. Also in 2022, CORE sent notice of withdrawal from the ownership agreement based on the same alleged breaches. In February 2023, CORE disclosed its expert witness, who estimated damages incurred of $270 million. Also in February 2023, the court granted PSCo’s motion precluding CORE from seeking damages related to its withdrawal as part of the lawsuit. PSCo continues to believe CORE's claims are without merit and disputes CORE’s right to withdraw.
Rate Matters and Other
Xcel Energy’s operating subsidiaries are involved in various regulatory proceedings arising in the ordinary course of business. Until resolution, typically in the form of a rate order, uncertainties may exist regarding the ultimate rate treatment for certain activities and transactions. Amounts have been recognized for probable and reasonably estimable losses that may result. Unless otherwise disclosed, any reasonably possible range of loss in excess of any recognized amount is not expected to have a material effect on the consolidated financial statements.
ShercoIn 2018, NSP-Minnesota and Southern Minnesota Municipal Power Agency (Co-owner of Sherco Unit 3) reached a settlement with GE related to a 2011 incident, which damaged the turbine at Sherco Unit 3 and resulted in an extended outage for repair. NSP-Minnesota notified the MPUC of its proposal to refund settlement proceeds to customers through the fuel clause adjustment.
In March 2019, the MPUC approved NSP-Minnesota’s settlement refund proposal. Additionally, the MPUC decided to withhold any decision as to NSP-Minnesota’s prudence in connection with the incident at Sherco Unit 3 until after conclusion of an appeal pending between GE and NSP-Minnesota’s insurers.
In February 2020, the Minnesota Court of Appeals affirmed the district court’s judgment in favor of GE. In March 2020, NSP-Minnesota’s insurers filed a petition seeking additional review by the Minnesota Supreme Court. In April 2020, the Minnesota Supreme Court denied the insurers’ petition for further review, ending the litigation.
In January 2021, the Minnesota Office of the Attorney General and DOC recommended that NSP-Minnesota refund approximately $17 million of replacement power costs previously recovered through the fuel clause adjustment. NSP-Minnesota subsequently filed its response, asserting that it acted prudently in connection with the Sherco Unit 3 outage, the MPUC has previously disallowed $22 million of related costs and no additional refund or disallowance is appropriate.
A final decision by the MPUC is expected in mid-2024. A loss related to this matter is deemed remote.
MISO ROE Complaints — In November 2013 and February 2015, customer groups filed two ROE complaints against MISO TOs, which includes NSP-Minnesota and NSP-Wisconsin. The first complaint requested a reduction in base ROE transmission formula rates from 12.38% to 9.15% for the time period of Nov. 12, 2013 to Feb. 11, 2015, and removal of ROE adders (including those for RTO membership). The second complaint requested, for a subsequent time period, a base ROE reduction from 12.38% to 8.67%.
The FERC subsequently issued various related orders (including Opinion Nos. 569, 569A and 569B) related to ROE methodology/calculations and timing. NSP-Minnesota has processed refunds to customers for applicable complaint periods based on the ROE in the most recent applicable opinions.
The MISO TOs and various other parties have filed petitions for review of the FERC’s most recent applicable opinions at the D.C. Circuit. In August 2022, the D.C. Circuit ruled that FERC had not adequately supported its conclusions, vacated FERC’s related orders and remanded the issue back to FERC for further proceedings, which remain pending. Additional exposure, if any related to this matter is expected to be immaterial.
SPP OATT Upgrade Costs — Costs of transmission upgrades may be recovered from other SPP customers whose transmission service depends on capacity enabled by the upgrade under the SPP OATT. SPP had not been charging its customers for these upgrades, even though the SPP OATT had allowed SPP to do so since 2008. In 2016, the FERC granted SPP’s request to recover these previously unbilled charges and SPP subsequently billed SPS approximately $13 million.
In 2018, SPS’ appeal to the D.C. Circuit over the FERC rulings granting SPP the right to recover previously unbilled charges was remanded to the FERC. In 2019, the FERC reversed its 2016 decision and ordered SPP to refund charges retroactively collected from its transmission customers, including SPS, related to periods before September 2015. In 2020, SPP and Oklahoma Gas & Electric separately filed petitions for review of the FERC’s orders at the D.C. Circuit. In 2021, the D.C. Circuit issued a decision denying these appeals and upholding the FERC’s orders. Refunds received by SPS are expected to be given back to SPS customers through future rates.
In 2017, SPS filed a separate related complaint asserting SPP assessed upgrade charges to SPS in violation of the SPP OATT. In 2018, the FERC issued an order denying the SPS complaint. SPS filed a request for rehearing in 2018. The FERC subsequently issued a tolling order granting a rehearing for further consideration. If SPS’ complaint results in additional charges or refunds, SPS will seek to recover or refund the amount through future SPS customer rates. In 2020, SPS filed a petition for review of the FERC’s 2018 orders at the D.C. Circuit. In February 2022, FERC issued an order rejecting SPS’ request for hearing. SPS has appealed that order. That appeal has been combined with SPS’ prior appeal.
Wind Operating Commitments — PUCT and NMPRC orders related to the Hale and Sagamore wind projects included certain operating and savings minimums. In general, annual generation must exceed a net capacity factor of 48%. If annual generation is below the guaranteed level, SPS would be obligated to refund an amount equal to foregone PTCs and fuel savings. Additionally, retail customer savings must exceed project costs included in base rates over the first ten years of operations. SPS would be required to refund excess costs, if any, after ten years of operations. As of Dec. 31, 2022, the full-year net capacity factor exceeded the guaranteed level, resulting in no refund liability for 2022.
Environmental
New and changing federal and state environmental mandates can create financial liabilities for Xcel Energy, which are normally recovered through the regulated rate process.
Site Remediation
Various federal and state environmental laws impose liability where hazardous substances or other regulated materials have been released to the environment. Xcel Energy Inc.’s subsidiaries may sometimes pay all or a portion of the cost to remediate sites where past activities of their predecessors or other parties have caused environmental contamination.
Environmental contingencies could arise from various situations, including sites of former MGPs; and third-party sites, such as landfills, for which one or more of Xcel Energy Inc.’s subsidiaries are alleged to have sent wastes to that site.
Historical MGP, Landfill and Disposal Sites
Xcel Energy is currently investigating, remediating or performing post-closure actions at 9 historical MGP, landfill or other disposal sites across its service territories, excluding sites that are being addressed under current coal ash regulations (see below).
Xcel Energy has recognized its best estimate of costs/liabilities from final resolution of these issues; however, the outcome and timing are unknown. In addition, there may be insurance recovery and/or recovery from other potentially responsible parties, offsetting a portion of costs incurred.
Environmental Requirements Water and Waste
Coal Ash Regulation Xcel Energy’s operations are subject to federal and state regulations that impose requirements for handling, storage, treatment and disposal of solid waste. Under the CCR Rule, utilities are required to complete groundwater sampling around their applicable landfills and surface impoundments as well as perform corrective actions where offsite groundwater has been impacted.
As of Dec. 31, 2022, Xcel Energy had eight regulated ash units in operation.
PSCo is currently exploring an agreement with a third party that would excavate and process ash for beneficial use (at two sites) and perform restoration at one site at a cost of approximately $45 million. An estimated liability has been recorded and amounts are expected to be fully recoverable through regulatory mechanisms.
Investigation and feasibility studies for additional corrective action related to offsite groundwater are ongoing (three sites). While the results are uncertain, additional costs are estimated to be up to $35 million. A liability has been recorded for the portion estimable/probable and are expected to be fully recoverable through regulatory mechanisms.
Federal Clean Water Act Section 316(b) — The Federal Clean Water Act requires the EPA to regulate cooling water intake structures to assure they reflect the best technology available for minimizing impingement and entrainment of aquatic species.
Estimated capital expenditures of approximately $45 million may be required for NSP-Minnesota to comply with the requirements pending approval of mitigation plans from the MPCA. Xcel Energy anticipates these costs will be recoverable through regulatory mechanisms.
Environmental Requirements Air
Reasonable Progress Rule and BART — In 2016, the EPA adopted a final rule establishing a federal implementation plan for reasonable further progress under the regional haze program for the state of Texas. The rule imposes SO2 emission limitations which would require the installation of dry scrubbers on Tolk Units 1 and 2; compliance would have been required by February 2021. SPS appealed the EPA’s decision and obtained a stay of the final rule.
In 2017, the EPA adopted a final BART rule for Texas. Under that rule, Harrington Units 1, 2, and 3 and Tolk Units 1 and 2 participate in intrastate SO2 budget and trading program. The rule also implemented participation in a federal ozone season NOx budget and trading program, named the Cross State Air Pollution Rule. The EPA is reconsidering this rule.
AROs — AROs have been recorded for Xcel Energy’s assets. For nuclear assets, the ARO is associated with the decommissioning of NSP-Minnesota nuclear generating plants.
Aggregate fair value of NSP-Minnesota’s legally restricted assets, for funding future nuclear decommissioning was $2.9 billion and $3.3 billion for 2022 and 2021, respectively.
Xcel Energy’s AROs were as follows:
(Millions 
of Dollars)
Jan. 1, 2022
Amounts Incurred (a)
Accretion
Cash Flow Revisions (b)
Dec. 31, 2022
Electric
Nuclear$2,056 $— $104 $— $2,160 
Wind478 25 19 (8)514 
Steam, hydro and other production288 34 12 14 348 
Distribution47 — — 48 
Natural gas
Transmission and distribution271 — 12 23 306 
Miscellaneous— — (7)
Common
Miscellaneous— — — 
Non-utility
Miscellaneous— — — 
Total liability$3,151 $59 $148 $22 $3,380 
(a)Amounts incurred related to the wind farms placed in service in 2022 for NSP-Minnesota (Dakota Range and Rock Aetna) and steam production pond remediation costs for PSCo.
(b)In 2022, AROs were revised for changes in timing and estimates of cash flows. Revisions in steam, hydro and other production AROs were primarily related to changes in cost estimates for remediation of ash containment facilities. Changes in gas transmission and distribution AROs were primarily related to changes in labor rates coupled with increased gas line mileage and number of services.
(Millions 
of Dollars)
Jan. 1, 2021
Amounts Incurred (a)
Accretion
Cash Flow Revisions (b)
Dec. 31, 2021
Electric
Nuclear$1,957 $— $99 $— $2,056 
Wind360 101 17 — 478 
Steam, hydro and other production264 10 288 
Distribution46 — — 47 
Natural gas
Transmission and distribution252 — 10 271 
Miscellaneous— — 
Common
Miscellaneous— — — 
Non-utility
Miscellaneous— — 
Total liability$2,884 $107 $138 $22 $3,151 
(a)Amounts incurred related to the wind farms placed in service in 2021 for NSP-Minnesota (Blazing Star 2, Mower and Freeborn) and removal of a utility scale battery asset in NSP-Minnesota.
(b)In 2021, AROs were revised for changes in timing and estimates of cash flows. Revisions in steam, hydro and other production AROs were primarily related to changes in cost estimates for remediation of ash containment facilities. Changes in gas transmission and distribution AROs were primarily related to changes in labor rates coupled with increased gas line mileage and number of services.
Indeterminate AROs Outside of the recorded asbestos AROs, other plants or buildings may contain asbestos due to the age of many of Xcel Energy’s facilities, but no confirmation or measurement of the cost of removal could be determined as of Dec. 31, 2022. Therefore, an ARO was not recorded for these facilities.
Nuclear
Nuclear Insurance — NSP-Minnesota’s public liability for claims from any nuclear incident is limited to $13.7 billion under the Price-Anderson amendment to the Atomic Energy Act. NSP-Minnesota has $450 million of coverage for its public liability exposure with a pool of insurance companies. The remaining $13.2 billion of exposure is funded by the Secondary Financial Protection Program available from assessments by the federal government.
NSP-Minnesota is subject to assessments of up to $138 million per reactor-incident for each of its three reactors, for public liability arising from a nuclear incident at any licensed nuclear facility in the United States. The maximum funding requirement is $20 million per reactor-incident during any one year. Maximum assessments are subject to inflation adjustments.
NSP-Minnesota purchases insurance for property damage and site decontamination cleanup costs from NEIL and EMANI. The coverage limits are $2.8 billion for each of NSP-Minnesota’s two nuclear plant sites. NEIL also provides business interruption insurance coverage up to $350 million, including the cost of replacement power during prolonged accidental outages of nuclear generating units. Premiums are expensed over the policy term.
All companies insured with NEIL are subject to retroactive premium adjustments if losses exceed accumulated reserve funds. Capital has been accumulated in the reserve funds of NEIL and EMANI to the extent that NSP-Minnesota would have no exposure for retroactive premium assessments in case of a single incident under the business interruption and the property damage insurance coverage.
NSP-Minnesota could be subject to annual maximum assessments of $12 million for business interruption insurance and $32 million for property damage insurance if losses exceed accumulated reserve funds.
Nuclear Fuel Disposal — NSP-Minnesota is responsible for temporarily storing spent nuclear fuel from its nuclear plants. The DOE is responsible for permanently storing spent fuel from U.S. nuclear plants, but no such facility is yet available.
NSP-Minnesota owns temporary on-site storage facilities for spent fuel at its Monticello and PI nuclear plants, which consist of storage pools and dry cask facilities. The Monticello dry-cask storage facility currently stores all 30 of the authorized canisters. The PI dry-cask storage facility currently stores 50 of the 64 authorized casks. Monticello’s future spent fuel will continue to be placed in its spent fuel pool. The decommissioning plan addresses the disposition of spent fuel at the end of the licensed life. A CON for additional storage at the Monticello site has been filed with the MPUC, to support possible life extension to 2040. NSP-Minnesota expects a decision by year-end 2023.
Regulatory Plant Decommissioning Recovery — Decommissioning activities for NSP-Minnesota’s nuclear facilities are planned to begin at the end of each unit’s authorized retirement dates, which can be different than the currently approved NRC operating licenses. These decommissioning activities are planned to be completed at both facilities by 2101.
NSP-Minnesota’s current operating licenses allow continued use of its Monticello nuclear plant until 2030 and its PI nuclear plant until 2033 for Unit 1 and 2034 for Unit 2. The MPUC reaffirmed a 60-year DECON scenario, where Monticello continues operations under a 10-year license extension (approved in August 2022). NRC approval of the extension is pending.
Future decommissioning costs of nuclear facilities are estimated through triennial periodic studies that assess the costs and timing of planned nuclear decommissioning activities for each unit. The 2020 nuclear decommissioning filing was approved by the MPUC and became effective in 2022.
Obligations for decommissioning are expected to be funded 100% by the external decommissioning trust fund. NSP-Minnesota had $2.9 billion and $3.3 billion of assets held in external decommissioning trusts at Dec. 31, 2022, and 2021, respectively.
See Note 10 to the consolidated financial statements for additional discussion.
Leases
Xcel Energy evaluates contracts that may contain leases, including PPAs and arrangements for the use of office space and other facilities, vehicles and equipment. A contract contains a lease if it conveys the exclusive right to control the use of a specific asset. A contract determined to contain a lease is evaluated further to determine if the arrangement is a finance lease.
ROU assets represent Xcel Energy's rights to use leased assets. The present value of future operating lease payments is recognized in other current liabilities and noncurrent operating lease liabilities. These amounts, adjusted for any prepayments or incentives, are recognized as operating lease ROU assets.
Most of Xcel Energy’s leases do not contain a readily determinable discount rate. Therefore, the present value of future lease payments is generally calculated using the applicable Xcel Energy subsidiary’s estimated incremental borrowing rate (weighted average of 4.1%). Xcel Energy has elected the practical expedient under which non-lease components, such as asset maintenance costs included in payments, are not deducted from minimum lease payments for the purposes of lease accounting and disclosure.
Leases with an initial term of 12 months or less are classified as short-term leases and are not recognized on the consolidated balance sheet.
Operating lease ROU assets:
(Millions of Dollars)Dec. 31, 2022Dec. 31, 2021
PPAs$1,669 $1,656 
Other244 225 
Gross operating lease ROU assets1,913 1,881 
Accumulated amortization(709)(590)
Net operating lease ROU assets$1,204 $1,291 
ROU assets for finance leases are included in other noncurrent assets, and the present value of future finance lease payments is included in other current liabilities and other noncurrent liabilities.
Xcel Energy’s most significant finance lease activities are related to WYCO, a joint venture with CIG, to develop and lease natural gas pipeline, storage and compression facilities. Xcel Energy Inc. has a 50% ownership interest in WYCO. WYCO leases its facilities to CIG, and CIG operates the facilities, providing natural gas storage and transportation services to PSCo under separate service agreements.
PSCo accounts for its Totem natural gas storage service and Front Range pipeline arrangements with CIG and WYCO, respectively, as finance leases. Xcel Energy Inc. eliminates 50% of the finance lease obligation related to WYCO in the consolidated balance sheet along with an equal amount of Xcel Energy Inc.’s equity investment in WYCO.
Finance lease ROU assets:
(Millions of Dollars)Dec. 31, 2022Dec. 31, 2021
Gas storage facilities$160 $201 
Gas pipeline21 21 
Gross finance lease ROU assets181 222 
Accumulated amortization(64)(97)
Net finance lease ROU assets$117 $125 
Components of lease expense:
(Millions of Dollars)202220212020
Operating leases
PPA capacity payments$241 $251 $238 
Other operating leases (a)
39 36 26 
Total operating lease expense (b)
$280 $287 $264 
Finance leases
Amortization of ROU assets$$$
Interest expense on lease liability16 17 18 
Total finance lease expense$20 $24 $25 
(a)Includes short-term lease expense of $6 million for 2022 and $5 million for 2021 and 2020.
(b)PPA capacity payments are included in electric fuel and purchased power on the consolidated statements of income. Expense for other operating leases is included in O&M expense and electric fuel and purchased power.
Commitments under operating and finance leases as of Dec. 31, 2022:
(Millions of Dollars)
PPA (a) (b)
Operating
Leases
Other Operating
Leases
Total
Operating
Leases
Finance
 Leases (c)
2023$231 $33 $264 $10 
2024238 28 266 10 
2025217 23 240 10 
2026161 18 179 
202790 18 108 
Thereafter326 74 400 181 
Total minimum obligation1,263 194 1,457 228 
Interest component of obligation(170)(32)(202)(162)
Present value of minimum obligation$1,093 162 1,255 66 
Less current portion(217)(2)
Noncurrent operating and finance lease liabilities$1,038 $64 
Weighted-average remaining lease term in years7.937.8
(a)Amounts do not include PPAs accounted for as executory contracts and/or contingent payments, such as energy payments on renewable PPAs.
(b)PPA operating leases contractually expire at various dates through 2033.
(c)Excludes certain amounts related to Xcel Energy’s 50% ownership interest in WYCO.
PPAs and Fuel Contracts
Non-Lease PPAs NSP-Minnesota, PSCo and SPS have entered into PPAs with other utilities and energy suppliers for purchased power to meet system load and energy requirements, operating reserve obligations and as part of wholesale and commodity trading activities. In general, these agreements provide for energy payments, based on actual energy delivered and capacity payments. Certain PPAs, accounted for as executory contracts with various expiration dates through 2033, contain minimum energy purchase commitments. Total energy payments on those contracts were $182 million, $149 million and $112 million in 2022, 2021 and 2020, respectively.
Included in electric fuel and purchased power expenses for PPAs accounted for as executory contracts were payments for capacity of $75 million, $69 million and $75 million in 2022, 2021 and 2020, respectively.
Capacity and energy payments are contingent on the IPPs meeting contract obligations, including plant availability requirements. Certain contractual payments are adjusted based on market indices. The effects of price adjustments on financial results are mitigated through purchased energy cost recovery mechanisms.
At Dec. 31, 2022, the estimated future payments for capacity and energy that the utility subsidiaries of Xcel Energy are obligated to purchase pursuant to these executory contracts, subject to availability, were as follows:
(Millions of Dollars)Capacity
Energy (a)
2023$77 $50 
202472 45 
202529 51 
202610 48 
202755 
Thereafter28 
Total$198 $277 
(a)Excludes contingent energy payments for renewable energy PPAs.
Fuel Contracts Xcel Energy has entered into various long-term commitments for the purchase and delivery of a significant portion of its coal, nuclear fuel and natural gas requirements. These contracts expire between 2023 and 2060. Xcel Energy is required to pay additional amounts depending on actual quantities shipped under these agreements.
Estimated minimum purchases under these contracts as of Dec. 31, 2022:
(Millions of Dollars)CoalNuclear fuelNatural gas supplyNatural gas supply and transportation
2023$628 $144 $684 $316 
2024343 112 290 
202590 158 276 
202653 37 — 276 
202755 155 — 225 
Thereafter194 — 607 
Total$1,171 $800 $693 $1,990 
VIEs 
PPAs Under certain PPAs, NSP-Minnesota, PSCo and SPS purchase power from IPPs for which the utility subsidiaries are required to reimburse fuel costs, or to participate in tolling arrangements under which the utility subsidiaries procure the natural gas required to produce the energy that they purchase. Xcel Energy has determined that certain IPPs are VIEs, however it is not subject to risk of loss from the operations of these entities, and no significant financial support is required other than contractual payments for energy and capacity.
In addition, certain solar PPAs provide an option to purchase emission allowances or sharing provisions related to production credits generated by the solar facility under contract. These specific PPAs create a variable interest in the IPP.
Xcel Energy evaluated each of these VIEs for possible consolidation, including review of qualitative factors such as the length and terms of the contract, control over O&M, control over dispatch of electricity, historical and estimated future fuel and electricity prices, and financing activities. Xcel Energy concluded that these entities are not required to be consolidated in its consolidated financial statements because it does not have the power to direct the activities that most significantly impact the entities’ economic performance.
The utility subsidiaries had approximately 3,961 MW and 4,062 MW of capacity under these long-term PPAs at Dec. 31, 2022 and 2021, respectively, with entities that have been determined to be VIEs. These agreements have expiration dates through 2041.
Fuel Contracts — SPS purchases all of its coal requirements for its Harrington and Tolk plants from TUCO Inc. under contracts that will expire in December 2024 and December 2027, respectively. TUCO arranges for the purchase, receiving, transporting, unloading, handling, crushing, weighing and delivery of coal to meet SPS’ requirements. TUCO is responsible for negotiating and administering contracts with coal suppliers, transporters and handlers.
SPS has not provided any significant financial support to TUCO, other than contractual payments for delivered coal. However, the fuel contracts create a variable interest in TUCO due to SPS’ reimbursement of fuel procurement costs.
SPS has determined that TUCO is a VIE, however it has concluded that SPS is not the primary beneficiary because it does not have the power to direct the activities that most significantly impact TUCO’s economic performance.
Low-Income Housing Limited Partnerships — Eloigne and NSP-Wisconsin have entered into limited partnerships with affordable rental housing activities that qualify for low-income housing tax credits.
Eloigne and NSP-Wisconsin, as primary beneficiaries of these activities, consolidate these limited partnerships in their consolidated financial statements.
Amounts reflected in Xcel Energy’s consolidated balance sheets for these investments include $44 million of assets and $35 million of liabilities at Dec. 31, 2022, and $45 million of assets and $35 million of liabilities at Dec. 31, 2021.
Other
Technology Agreements — Xcel Energy has several contracts for information technology services that extend through 2027. The contracts are cancelable, although there are financial penalties for early termination. Xcel Energy capitalized or expensed $181 million, $103 million and $110 million associated with these vendors in 2022, 2021 and 2020, respectively.
Committed minimum payments under these obligations as follows:
(Millions of Dollars)Minimum Payments
2023$24 
202413 
202512 
202611 
202710 
Thereafter— 
Guarantees and Bond Indemnifications Xcel Energy Inc. and its subsidiaries provide guarantees and bond indemnities, which guarantee payment or performance. Xcel Energy Inc.’s exposure is based upon the net liability under the specified agreements or transactions. Most of the guarantees and bond indemnities issued by Xcel Energy Inc. and its subsidiaries have a stated maximum amount.
As of Dec. 31, 2022 and 2021, Xcel Energy Inc. and its subsidiaries had no assets held as collateral related to their guarantees, bond indemnities and indemnification agreements. Guarantees and bond indemnities issued and outstanding for Xcel Energy were $62 million and $60 million at Dec. 31, 2022 and 2021 respectively.
Other Indemnification Agreements — Xcel Energy Inc. and its subsidiaries provide indemnifications through various contracts. These are primarily indemnifications against adverse litigation outcomes in connection with underwriting agreements, as well as breaches of representations and warranties, including corporate existence, transaction authorization and income tax matters with respect to assets sold.
Xcel Energy Inc.’s and its subsidiaries’ obligations under these agreements may be limited in terms of duration and amount. Maximum future payments under these indemnifications cannot be reasonably estimated as the dollar amounts are often not explicitly stated.