Commitments and Contingencies
12 Months Ended
Dec. 31, 2019
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies
Legal
Xcel Energy is involved in various litigation matters that are being defended and handled in the ordinary course of business. Assessing whether a loss is probable or a reasonable possibility, and whether the loss or a range of loss is estimable, often involves complex judgments regarding future events. Management maintains accruals for losses that are probable of being incurred and subject to reasonable estimation.
Management may be unable to estimate an amount or range of a reasonably possible loss in certain situations, including when (1) the damages sought are indeterminate, (2) the proceedings are in the early stages, or (3) the matters involve novel or unsettled legal theories. In such cases, there is considerable uncertainty regarding the timing or ultimate resolution of such matters, including a possible eventual loss. For current proceedings not specifically reported herein, management does not anticipate the ultimate liabilities, if any, arising from such current proceedings would have a material effect on Xcel Energy’s financial statements. Unless otherwise required by GAAP, legal fees are expensed as incurred.
Gas Trading Litigation e prime is a wholly owned subsidiary of Xcel Energy. e prime was in the business of natural gas trading and marketing but has not engaged in natural gas trading or marketing activities since 2003.  Multiple lawsuits involving multiple plaintiffs seeking monetary damages were commenced against e prime and its affiliates, including Xcel Energy, between 2003 and 2009 alleging fraud and anticompetitive activities in conspiring to restrain the trade of natural gas and manipulate natural gas prices. Cases were all consolidated in the U.S. District Court in Nevada.
Two cases remain active which include an MDL matter consisting of a Colorado purported class (Breckenridge) and a Wisconsin purported class (Arandell Corp.).
Breckenridge/Colorado — In February 2019, the MDL panel remanded Breckenridge back to the U.S. District Court in Colorado.
Arandell Corp. — In February 2019, the case was remanded back to the U.S. District Court in Wisconsin.
Xcel Energy has concluded that a loss is remote for both remaining lawsuits.
Line Extension Disputes — In December 2015, the DRC filed a lawsuit seeking monetary damages in the Denver District Court, stating PSCo failed to award proper allowances and refunds for line extensions to new developments pursuant to the terms of electric and gas service agreements. The dispute involves claims by over fifty developers. In February 2018, the Colorado Supreme Court denied DRC’s petition to appeal the Denver District Court’s dismissal of the lawsuit, effectively terminating this litigation. However, in January 2018, DRC filed a new lawsuit in Boulder County District Court, asserting a single claim that PSCo was required to file its line extension agreements with the CPUC but failed to do so.
This claim is similar to the arguments previously raised by the DRC. PSCo filed a motion to dismiss this claim, which was granted in May 2018. The DRC subsequently filed an appeal to the Colorado Court of Appeals. In November 2019, the Colorado Court of Appeals issued an opinion affirming dismissal of the lawsuit based upon lack of subject matter jurisdiction. The Colorado Court of Appeals did not address the second issue based upon issue preclusion. Finally, the Colorado Court of Appeals remanded the case to the Boulder District Court to consider PSCo’s request for an award of costs, which it concluded does not include attorneys’ fees. The DRC did not file a petition for a Writ of Certiorari to the Colorado Supreme Court by the Dec. 26, 2019 deadline, effectively terminating this litigation.
Rate Matters
MEC Acquisition In November 2018, NSP-Minnesota reached an agreement with Southern Power Company (a subsidiary of Southern Company) to purchase MEC, a 760 MW natural gas combined cycle facility, with capacity and energy historically sold to NSP-Minnesota under PPAs expiring in 2026 and 2039, for approximately $650 million.
In September 2019, the MPUC denied NSP-Minnesota's request to purchase MEC as a rate base asset. In January 2020, the MPUC approved Xcel Energy’s plan to acquire MEC as a non-regulated investment and step into the terms of the existing PPAs with NSP-Minnesota. A newly formed non-regulated subsidiary of Xcel Energy completed the transaction to purchase MEC on Jan. 17, 2020.
Sherco In NSP-Minnesota’s 2013 fuel reconciliation filing, the MPUC made recovery of replacement power costs associated with the 2011 incident at its Sherco Unit 3 plant provisional and subject to further review following conclusion of litigation commenced by NSP-Minnesota, SMMPA (Co-owner of Sherco Unit 3) and insurance companies against GE.
In 2018, NSP-Minnesota and SMMPA reached a settlement with GE. NSP-Minnesota notified the MPUC of its proposal to refund the GE settlement proceeds back to customers through the FCA. The insurance providers continued their litigation against GE and the case went to trial.
In 2018, GE prevailed in the lawsuit with the insurance companies, however, the jury found comparable fault, finding that GE was 52% and NSP-Minnesota was 48% at fault. At that point in the litigation, NSP-Minnesota was no longer involved in the case and was not present to make arguments about its role in the event. The specific issue leading to the fault apportionment was also not before the jury and not relevant to the outcome of the trial.
In January 2019, the DOC recommended that NSP-Minnesota refund $20 million of previously recovered purchased power costs to its customers, based on the jury’s apportionment of fault. The OAG recommended the MPUC withhold any decision until the underlying litigation by the insurance providers (currently under appeal) is concluded. The DOC subsequently filed comments agreeing with the OAG’s recommendation to withhold a decision pending the outcome of any appeals. NSP-Minnesota filed reply comments arguing that the DOC recommendations are without merit and that it acted prudently in operating the plant and its settlement with GE was reasonable.
In March 2019, MPUC approved NSP-Minnesota’s proposal to refund the GE settlement proceeds back to customers through the FCA. It also decided to withhold any decision as to NSP-Minnesota’s prudence in connection with the incident at Sherco Unit 3 until after conclusion of the pending litigation between GE and NSP-Minnesota’s insurers.
MISO ROE Complaints — In November 2013 and February 2015, customers filed complaints against MISO TOs including NSP-Minnesota and NSP-Wisconsin.
The first complaint argued for a reduction in the base ROE in MISO transmission formula rates from 12.38% to 9.15%, and removal of ROE adders (including those for RTO membership). The second complaint sought to reduce base ROE from 12.38% to 8.67%.
In September 2016, the FERC issued an order granting a 10.32% base ROE (10.82% with the RTO adder) effective for the first complaint period of Nov. 12, 2013 to Feb. 11, 2015 and subsequent to the date of the order. The D.C. Circuit subsequently vacated and remanded FERC Opinion No. 531, which had established the ROE methodology on which the September 2016 FERC order was based.
On March 21, 2019, FERC announced a NOI seeking public comments on whether, and if so how, to revise ROE policies in light of the D.C. Circuit Court decision. FERC also initiated a NOI on whether to revise its policies on incentives for electric transmission investments, including the RTO membership incentive. In November 2019, the FERC issued an order adopting a new ROE methodology and settling the MISO base ROE at 9.88% (10.38% with the RTO adder), effective Sept. 28, 2016 and for the Nov. 12, 2013 to Feb. 11, 2015 refund period. The FERC also dismissed the second complaint.
In December 2019, MISO TOs filed a request for rehearing. Customers also filed requests for rehearing claiming, among other points, that the FERC erred by dismissing the second complaint without refunds. Xcel Energy has recognized a liability for its best estimate of final refunds to customers. It is uncertain when the FERC will act on the requests for rehearing or any other pending matters related to the 2019 NOIs.
Texas Fuel Reconciliation In December 2018, SPS filed an application with the PUCT for reconciliation of fuel costs for the period Jan. 1, 2016, through June 30, 2018, to determine whether all fuel costs incurred were eligible for recovery. In December 2019, the PUCT issued an order disallowing recovery of costs for Texas customers related to two specific solar PPAs. These PPAs were previously approved by the NMPRC as reasonable, necessary and economic. SPS recorded a total disallowance of approximately $6 million in December 2019.
SPP OATT Upgrade Costs — Under the SPP OATT, costs of transmission upgrades may be recovered from other SPP customers whose transmission service depends on capacity enabled by the upgrade. SPP had not been charging its customers for these upgrades, even though the SPP OATT had allowed SPP to do so since 2008. In 2016, the FERC granted SPP’s request to recover previously unbilled charges and SPP subsequently billed SPS approximately $13 million.
In July 2018, SPS’ appeal to the D.C. Circuit over the FERC rulings granting SPP the right to recover previously unbilled charges was remanded to the FERC. In February 2019, the FERC reversed its 2016 decision and ordered SPP to refund charges retroactively collected from its transmission customers, including SPS, related to periods before September 2015. In April 2019, several parties, including SPP, filed requests for a rehearing. Timing of a FERC response to rehearing requests is uncertain. Any refunds received by SPS are expected to be given back to SPS customers through future rates.
In October 2017, SPS filed a separate complaint against SPP asserting SPP assessed upgrade charges to SPS in violation of the SPP OATT. The FERC granted a rehearing for further consideration in May 2018. Timing of FERC action on the SPS rehearing is uncertain. If SPS’ complaint results in additional charges or refunds, SPS will seek to recover or refund the amounts through future SPS customer rates.
Environmental
New and changing federal and state environmental mandates can create financial liabilities for Xcel Energy, which are normally recovered through the regulated rate process.
Site Remediation — Various federal and state environmental laws impose liability where hazardous substances or other regulated materials have been released to the environment. Xcel Energy Inc.’s subsidiaries may sometimes pay all or a portion of the cost to remediate sites where past activities of their predecessors or other parties have caused environmental contamination. Environmental contingencies could arise from various situations, including sites of former MGPs; and third-party sites, such as landfills, for which one or more of Xcel Energy Inc.’s subsidiaries are alleged to have sent wastes to that site.
MGP Sites
Ashland MGP Site — NSP-Wisconsin was named a responsible party for contamination at the Ashland/Northern States Power Lakefront Superfund Site (the Site) in Ashland, Wisconsin. Remediation was completed in 2019 and restoration activities are anticipated to be completed in 2020. Groundwater treatment activities will continue for many years.
The current cost estimate for remediation and restoration of the entire site is approximately $199 million. At Dec. 31, 2019 and 2018, NSP-Wisconsin had a total liability of $23 million and $27 million, respectively, for the entire site.
NSP-Wisconsin has deferred the unrecovered portion of the estimated Site remediation and restoration costs as a regulatory asset. The PSCW has authorized NSP-Wisconsin rate recovery for all remediation and restoration costs incurred at the Site. In its final December 2019 order approving 2020 and 2021 natural gas base rates, the PSCW authorized continued amortization of costs and application of a 3% carrying charge to the regulatory asset.
MGP, Landfill or Disposal Sites — PSCo is cooperating with the City of Denver on an environmental investigation of the Rice Yards Site in Denver, Colorado, which had various historic industrial uses by multiple parties, including railroad, maintenance shop, scrap metal yard, and MGP operations.
The area is being redeveloped into residential and commercial mixed uses, and PSCo is in discussions with the current property owner regarding legal claims related to the Rice Yards Site.
In addition, Xcel Energy is currently investigating or remediating 12 other MGP, landfill or other disposal sites across its service territories.
Xcel Energy has recognized its best estimate of costs/liabilities that will result from final resolution of these issues, however, the outcome and timing is unknown. In addition, there may be insurance recovery and/or recovery from other potentially responsible parties, offsetting a portion of costs incurred.
Environmental Requirements Water and Waste
Coal Ash Regulation Xcel Energy’s operations are subject to federal and state laws that impose requirements for handling, storage, treatment and disposal of solid waste. Under the CCR Rule, utilities are required to complete groundwater sampling around their CCR landfills and surface impoundments. Currently, Xcel Energy has nine regulated ash units in operation.
Xcel Energy is conducting groundwater sampling and, where appropriate, initiating the assessment of corrective measures and evaluating whether corrective action is required at any CCR landfills or surface impoundments. In 2019, groundwater monitoring consistent with the CCR Rule was conducted. In NSP-Minnesota, no results above the groundwater protection standards in the rule were identified. In PSCo, statistically significant increase above background concentration was detected at four locations. Subsequently, assessment monitoring samples were collected, and PSCo is evaluating the results to determine whether corrective action is required. Until PSCo completes its assessment, it is uncertain what impact, if any, there will be on the operations, financial condition or cash flows.
In August 2018, the D.C. Circuit ruled that the EPA cannot allow utilities to continue to use unlined impoundments (including clay lined impoundments) for the storage or disposal of coal ash. In November 2019, the EPA proposed rules in response to this decision.
If finalized in their current form, these rules would require NSP-Minnesota to expedite closure plans for one impoundment at an estimated cost of $2 million and the construction of a new impoundment at the cost of $9 million.
In 2019, Xcel Energy initiated the construction of this new impoundment, an ash pond, expected to be in service in 2020. Upon placing the new ash pond in service, the existing ash pond will be taken out of service, and closure activities as prescribed by the CCR Rule and the facility’s National Pollutant Discharge Elimination System permit will be initiated. In addition, the rules proposed by the EPA may require PSCo to expedite the closure of one coal ash impoundment.
Closure costs for existing impoundments are included in the calculation of the ARO liability. See Note 12 for further information.
Federal CWA WOTUS Rule In 2015, the EPA and U.S. Army Corps of Engineers published a final rule that significantly broadened the scope of waters under the CWA that are subject to federal jurisdiction, referred to as “WOTUS”. In 2019, the EPA repealed the 2015 rule and published a draft replacement rule. Until a final rule is issued, Xcel Energy cannot estimate potential impacts, but anticipates costs will be recoverable through regulatory mechanisms.
Federal CWA ELG — In 2015, the EPA issued a final ELG rule for power plants that discharge treated effluent to surface waters as well as utility-owned landfills that receive CCRs. In 2017, the EPA delayed the compliance date for flue gas desulfurization wastewater and bottom ash transport until November 2020. After 2020, Xcel Energy estimates that ELG compliance will cost approximately $12 million to complete. The EPA, however, is conducting a rulemaking process to revise certain effluent limitations and pretreatment standards, which may impact compliance costs. Xcel Energy anticipates these costs will be fully recoverable through regulatory mechanisms.
Federal CWA Section 316(b) — The federal CWA requires the EPA to regulate cooling water intake structures to assure that these structures reflect the best technology available for minimizing impingement and entrainment of aquatic species. Xcel Energy estimates the likely cost for complying with impingement and entrainment requirements is approximately $40 million, to be incurred between 2020 and 2028. Xcel Energy believes six NSP-Minnesota plants and two NSP-Wisconsin plants could be required by state regulators to make improvements to reduce impingement and entrainment. The exact total cost of the impingement and entrainment improvements is uncertain but could be up to approximately $198 million. Xcel Energy anticipates these costs will be fully recoverable through regulatory mechanisms.
Environmental Requirements — Air
Regional Haze Rules — The regional haze program requires SO2, nitrogen oxide and particulate matter emission controls at power plants to reduce visibility impairment in national parks and wilderness areas. The program includes BART and reasonable further progress. The requirements of the first regional haze plans developed by Minnesota and Colorado have been approved and implemented. Texas’ first regional haze plan has undergone federal review as described below.
BART Determination for Texas: The EPA has issued a revised final rule adopting a BART alternative Texas only SO2 trading program that applies to all Harrington and Tolk units. Under the trading program, SPS expects the allowance allocations to be sufficient for SO2 emissions. The anticipated costs of compliance are not expected to have a material impact; and SPS believes that compliance costs would be recoverable through regulatory mechanisms.
Several parties have challenged whether the final rule issued by the EPA should be considered to have met the requirements imposed in a Consent Decree entered by the United States District Court for the District of Columbia that established deadlines for the EPA to take final action on state regional haze plan submissions. The court has required status reports from the parties while the EPA works on the reconsideration rulemaking.
In December 2017, the National Parks Conservation Association, Sierra Club, and Environmental Defense Fund appealed the EPA’s 2017 final BART rule to the Fifth Circuit and filed a petition for administrative reconsideration. In January 2018, the court granted SPS’ motion to intervene in the Fifth Circuit litigation in support of the EPA’s final rule. The court has held the litigation in abeyance while the EPA decided whether to reconsider the rule. In August 2018, the EPA started a reconsideration rulemaking, which was supplemented by an additional agency notice in November 2019. It is not known when the EPA will make a final decision on this proposal.
Reasonable Progress Rule: In 2016, the EPA adopted a final rule establishing a federal implementation plan for reasonable further progress under the regional haze program for the state of Texas. The rule imposes SO2 emission limitations that would require the installation of dry scrubbers on Tolk Units 1 and 2, with compliance required by February 2021. Investment costs associated with dry scrubbers could be $600 million. SPS appealed the EPA’s decision and obtained a stay of the final rule.
In March 2017, the Fifth Circuit remanded the rule to the EPA for reconsideration, leaving the stay in effect. In a future rulemaking, the EPA will address whether SO2 emission reductions beyond those required in the BART alternative rule are needed at Tolk under the “reasonable progress” requirements. The EPA has not announced a schedule for acting on the remanded rule.
Implementation of the NAAQS for SO2 — The EPA has designated all areas near SPS’ generating plants as attaining the SO2 NAAQS with an exception. The EPA issued final designations, which found the area near the SPS Harrington plant as “unclassifiable.” The area near the Harrington plant is to be monitored for three years and a final designation is expected to be made by December 2020.
If the area near the Harrington plant is designated nonattainment in 2020, the TCEQ will need to develop an implementation plan, designed to achieve the NAAQS by 2025. The TCEQ could require additional SO2 controls at Harrington as part of such a plan. Xcel Energy cannot evaluate the impacts until the final designation is made and any required state plans are developed.
Xcel Energy believes that should SO2 control systems be required for a plant, compliance costs or the costs of alternative cost-effective generation will be recoverable through regulatory mechanisms and therefore does not expect a material impact on results of operations, financial condition or cash flows.
AROs — AROs have been recorded for Xcel Energy’s assets. For nuclear assets, the ARO is associated with the decommissioning of NSP-Minnesota nuclear generating plants.
Aggregate fair value of NSP-Minnesota’s legally restricted assets, for funding future nuclear decommissioning, was $2.4 billion and $2.1 billion for 2019 and 2018, respectively.
Xcel Energy’s AROs were as follows:
(Millions 
of Dollars)
 
Jan. 1, 2019
 
Amounts
Incurred
(a)
 
Amounts
Settled
(b)
 
Accretion
 
Cash Flow Revisions (c)
 
Dec. 31, 2019
Electric
 
 
 
 
 
 
 
 
 
 
 
 
Nuclear
 
$
1,968

 
$

 
$

 
$
100

 
$

 
$
2,068

Steam, hydro and other production
 
177

 

 
(5
)
 
8

 
22

 
202

Wind
 
119

 
26

 

 
7

 
(6
)
 
146

Distribution
 
42

 

 

 
2

 

 
44

Miscellaneous
 
7

 

 

 

 
(7
)
 

Natural gas
 
 
 
 
 
 
 
 
 
 
 
 
Transmission and distribution
 
249

 

 

 
11

 
(24
)
 
236

Miscellaneous
 
4

 

 

 

 
(1
)
 
3

Common
 
 
 
 
 
 
 
 
 
 
 
 
Miscellaneous
 
1

 

 

 

 

 
1

Non-utility
 
 
 
 
 
 
 
 
 
 
 
 
Miscellaneous
 
1

 

 

 

 

 
1

Total liability
 
$
2,568

 
$
26

 
$
(5
)
 
$
128

 
$
(16
)
 
$
2,701

(a) 
Amounts incurred related to the wind farms placed in service in 2019 for NSP-Minnesota (Lake Benton and Foxtail) and SPS (Hale).
(b) 
Amounts settled related to asbestos abatement projects and closure of certain ash containment facilities.
(c) 
In 2019, AROs were revised for changes in timing and estimates of cash flows. Changes in gas transmission and distribution AROs were primarily related to increased gas line mileage and number of services, which were more than offset by decreased inflation rates. Changes in steam, hydro and other production AROs primarily related to the cost estimates to remediate ponds at production facilities. Changes in wind AROs were driven by new dismantling studies.
(Millions 
of Dollars)
 
Jan. 1, 2018
 
Amounts
Incurred
(a)
 
Amounts
Settled
(b)
 
Accretion
 
Cash Flow Revisions (c)
 
Dec. 31, 2018
Electric
 
 
 
 
 
 
 
 
 
 
 
 
Nuclear
 
$
1,874

 
$

 
$

 
$
94

 
$

 
$
1,968

Steam, hydro and other production
 
192

 

 
(14
)
 
8

 
(9
)
 
177

Wind
 
96

 
12

 

 
4

 
7

 
119

Distribution
 
21

 

 

 
1

 
20

 
42

Miscellaneous
 
5

 

 

 

 
2

 
7

Natural gas
 
 
 
 
 
 
 
 
 
 
 
 
Transmission and distribution
 
282

 

 

 
13

 
(46
)
 
249

Miscellaneous
 
4

 

 

 

 

 
4

Common
 
 
 
 
 
 
 
 
 
 
 
 
Miscellaneous
 
1

 

 

 

 

 
1

Non-utility
 
 
 
 
 
 
 
 
 
 
 
 
Miscellaneous
 

 
1

 

 

 

 
1

Total liability
 
$
2,475

 
$
13

 
$
(14
)
 
$
120

 
$
(26
)
 
$
2,568


(a) 
Amounts incurred related to the PSCo Rush Creek wind farm and Nicollet Projects community solar gardens, which were placed in service in 2018.
(b) 
Amounts settled related to asbestos abatement projects and closure of certain ash containment facilities.
(c) 
In 2018, AROs were revised for changes in timing and estimates of cash flows. Changes in gas transmission and distribution AROs were primarily related to increased gas line mileage and number of services, which were more than offset by increased discount rates. Changes in electric distribution AROs primarily related to increased labor costs.
Indeterminate AROs Other plants or buildings may contain asbestos due to the age of many of Xcel Energy’s facilities, but no confirmation or measurement of the cost of removal could be determined as of Dec. 31, 2019. Therefore, an ARO was not recorded for these facilities.
Removal Costs Xcel Energy records a regulatory liability for the plant removal costs of its utility subsidiaries that are recovered currently in rates. Removal costs have accumulated based on varying rates as authorized by the appropriate regulatory entities. The utility subsidiaries have estimated the amount of removal costs accumulated through historic depreciation expense based on current factors used in the existing depreciation rates.
Accumulated balances by entity at Dec. 31:
(Millions of Dollars)
 
2019
 
2018
NSP-Minnesota
 
$
520

 
$
485

PSCo
 
351

 
344

SPS
 
175

 
188

NSP-Wisconsin
 
171

 
158

Total Xcel Energy
 
$
1,217

 
$
1,175


Nuclear Related
Nuclear Insurance — NSP-Minnesota’s public liability for claims from any nuclear incident is limited to $13.9 billion under the Price-Anderson amendment to the Atomic Energy Act. NSP-Minnesota has secured $450 million of coverage for its public liability exposure with a pool of insurance companies. The remaining $13.5 billion of exposure is funded by the Secondary Financial Protection Program, available from assessments by the federal government.
NSP-Minnesota is subject to assessments of up to $138 million per reactor-incident for each of its three licensed reactors, for public liability arising from a nuclear incident at any licensed nuclear facility in the United States. The maximum funding requirement is $21 million per reactor-incident during any one year. Maximum assessments are subject to inflation adjustments by the NRC and state premium taxes. The NRC’s last adjustment was effective November 2018.
NSP-Minnesota purchases insurance for property damage and site decontamination cleanup costs from NEIL and EMANI. The coverage limits are $2.7 billion for each of NSP-Minnesota’s two nuclear plant sites. NEIL also provides business interruption insurance coverage up to $350 million, including the cost of replacement power during prolonged accidental outages of nuclear generating units. Premiums are expensed over the policy term.
All companies insured with NEIL are subject to retroactive premium adjustments if losses exceed accumulated reserve funds. Capital has been accumulated in the reserve funds of NEIL and EMANI to the extent that NSP-Minnesota would have no exposure for retroactive premium assessments in case of a single incident under the business interruption and the property damage insurance coverage.
NSP-Minnesota could be subject to annual maximum assessments of approximately $12 million for business interruption insurance and $35 million for property damage insurance if losses exceed accumulated reserve funds.
Nuclear Fuel Disposal — NSP-Minnesota is responsible for temporarily storing spent nuclear fuel from its nuclear plants. The DOE is responsible for permanently storing spent fuel from U.S. nuclear plants, but no such facility is yet available.
NSP-Minnesota owns temporary on-site storage facilities for spent fuel at its Monticello and PI nuclear plants, which consist of storage pools and dry cask facilities. The Monticello dry-cask storage facility currently stores all 30 of the authorized canisters. The PI dry-cask storage facility currently stores 44 of the 64 authorized casks. Monticello’s future spent fuel will continue to be placed in its spent fuel pool. The decommissioning plan addresses the disposition of spent fuel at the end of the licensed life.
Regulatory Plant Decommissioning Recovery — Decommissioning activities for NSP-Minnesota’s nuclear facilities are planned to begin at the end of each unit’s operating license and be completed by 2091. NSP-Minnesota’s current operating licenses allow continued use of its Monticello nuclear plant until 2030 and its PI nuclear plant until 2033 for Unit 1 and 2034 for Unit 2.
Future decommissioning costs of nuclear facilities are estimated through triennial periodic studies that assess the costs and timing of planned nuclear decommissioning activities for each unit.
Obligations for decommissioning are expected to be funded 100% by the external decommissioning trust fund. The cost study assumes the external decommissioning fund will earn an after-tax return between 5.23% and 6.30%. Realized and unrealized gains on fund investments are deferred as an offset of NSP-Minnesota’s regulatory asset for nuclear decommissioning costs. Decommissioning costs are quantified in 2014 dollars. Escalation rates are 4.36% for plant removal activities and 3.36% for fuel management and site restoration activities.
NSP-Minnesota had $2.4 billion of assets held in external decommissioning trusts at Dec. 31, 2019. The following table summarizes the funded status of NSP-Minnesota’s decommissioning obligation. Xcel Energy believes future decommissioning costs will continue to be recovered in customer rates. The following amounts were prepared on a regulatory basis and not directly recorded in the financial statements as an ARO.
 
 
Regulatory Basis
(Millions of Dollars)
 
2019
 
2018
Estimated decommissioning cost obligation from most recently approved study (in 2014 dollars)
 
$
3,012

 
$
3,012

Effect of escalating costs
 
688

 
539

Estimated decommissioning cost obligation (in current dollars)
 
3,700

 
3,551

Effect of escalating costs to payment date
 
7,505

 
7,654

Estimated future decommissioning costs (undiscounted)
 
11,205

 
11,205

Effect of discounting obligation (using average risk-free interest rate of 2.39% and 3.33% for 2019 and 2018, respectively)
 
(5,562
)
 
(6,911
)
Discounted decommissioning cost obligation
 
$
5,643

 
$
4,294

Assets held in external decommissioning trust
 
$
2,440

 
$
2,055

Underfunding of external decommissioning fund compared to the discounted decommissioning obligation
 
3,203

 
2,239


Calculations and data used by the regulator in approving NSP-Minnesota’s rates are useful in assessing future cash flows. Regulatory basis information is a means to reconcile amounts previously provided to the MPUC and utilized for regulatory purposes to amounts used for financial reporting.
Reconciliation of the discounted decommissioning cost obligation - regulated basis to the ARO recorded in accordance with GAAP:
(Millions of Dollars)
 
2019
 
2018
Discounted decommissioning cost obligation - regulated basis
 
$
5,643

 
$
4,294

Differences in discount rate and market risk premium
 
(2,295
)
 
(1,447
)
O&M costs not included for GAAP
 
(1,280
)
 
(879
)
Nuclear production decommissioning ARO - GAAP
 
$
2,068

 
$
1,968


Decommissioning expenses recognized as a result of regulation:
(Millions of Dollars)
 
2019
 
2018
 
2017
Annual decommissioning recorded as depreciation expense: (a) (b)
 
$
20

 
$
20

 
$
20


(a) 
Decommissioning expense does not include depreciation of the capitalized nuclear asset retirement costs.
(b) 
Decommissioning expenses in 2019, 2018 and 2017 include Minnesota’s retail jurisdiction annual funding requirement of approximately $14 million.
The 2014 nuclear decommissioning filing, approved in 2015, was used for regulatory presentation in 2019, 2018 and 2017. The 2017 filing, effective Jan. 1, 2019, has been approved by the MPUC. In December 2019, the MPUC verbally approved for NSP-Minnesota to delay any increase to the annual funding requirement until 2021.
Leases
Xcel Energy evaluates contracts that may contain leases, including PPAs and arrangements for the use of office space and other facilities, vehicles and equipment. Under ASC Topic 842, adopted by Xcel Energy on Jan. 1, 2019, a contract contains a lease if it conveys the exclusive right to control the use of a specific asset. A contract determined to contain a lease is evaluated further to determine if the arrangement is a finance lease.
ROU assets represent Xcel Energy's rights to use leased assets. Starting in 2019, the present value of future operating lease payments are recognized in other current liabilities and noncurrent operating lease liabilities. These amounts, adjusted for any prepayments or incentives, are recognized as operating lease ROU assets.
Most of Xcel Energy’s leases do not contain a readily determinable discount rate. Therefore, the present value of future lease payments is generally calculated using the applicable Xcel Energy subsidiary’s estimated incremental borrowing rate (weighted-average of 4.1%). Xcel Energy has elected the practical expedient under which non-lease components, such as asset maintenance costs included in payments, are not deducted from minimum lease payments for the purposes of lease accounting and disclosure.
Leases with an initial term of 12 months or less are classified as short-term leases and are not recognized on the consolidated balance sheet.
Operating lease ROU assets:
(Millions of Dollars)
 
Dec. 31, 2019
PPAs
 
$
1,642

Other
 
201

Gross operating lease ROU assets
 
1,843

Accumulated amortization
 
(171
)
Net operating lease ROU assets
 
$
1,672



In 2019, ROU assets for finance leases are included in other noncurrent assets, and the present value of future finance lease payments is included in other current liabilities and other noncurrent liabilities. Prior to 2019, finance leases were included in property, plant and equipment, the current portion of long-term debt and long-term debt.
Xcel Energy’s most significant finance lease activities are related to WYCO, a joint venture with CIG, to develop and lease natural gas pipeline, storage and compression facilities. Xcel Energy Inc. has a 50% ownership interest in WYCO. WYCO leases its facilities to CIG, and CIG operates the facilities, providing natural gas storage and transportation services to PSCo under separate service agreements.
PSCo accounts for its Totem natural gas storage service and Front Range pipeline arrangements with CIG and WYCO, respectively, as finance leases. Xcel Energy Inc. eliminates 50% of the finance lease obligation related to WYCO in the consolidated balance sheet along with an equal amount of Xcel Energy Inc.’s equity investment in WYCO.
Finance lease ROU assets:
(Millions of Dollars)
 
Dec. 31, 2019
 
Dec. 31, 2018
Gas storage facilities
 
$
201

 
$
201

Gas pipeline
 
21

 
21

Gross finance lease ROU assets
 
222

 
222

Accumulated amortization
 
(83
)
 
(77
)
Net finance lease ROU assets
 
$
139

 
$
145


Components of lease expense:
(Millions of Dollars)
 
2019
 
2018
 
2017
Operating leases
 
 
 
 
 
 
PPA capacity payments
 
$
221

 
$
210

 
$
210

Other operating leases (a)
 
34

 
38

 
36

Total operating lease expense (b)
 
$
255

 
$
248

 
$
246

Finance leases
 
 
 
 
 
 
Amortization of ROU assets
 
$
6

 
$
6

 
$
5

Interest expense on lease liability
 
19

 
19

 
20

Total finance lease expense
 
$
25

 
$
25

 
$
25

(a) 
Includes short-term lease expense of $5 million for 2019, 2018 and 2017.
(b) 
PPA capacity payments are included in electric fuel and purchased power on the consolidated statements of income. Expense for other operating leases is included in O&M expense and electric fuel and purchased power.
Commitments under operating and finance leases as of Dec. 31, 2019:
(Millions of Dollars)
 
PPA (a) (b)
Operating
Leases
 
Other Operating
Leases
 
Total
Operating
Leases
 
Finance
 Leases (c)
2020
 
$
236

 
$
26

 
$
262

 
$
14

2021
 
238

 
29

 
267

 
14

2022
 
225

 
28

 
253

 
12

2023
 
214

 
25

 
239

 
12

2024
 
208

 
22

 
230

 
12

Thereafter
 
750

 
115

 
865

 
207

Total minimum obligation
 
1,871

 
245

 
2,116

 
271

Interest component of obligation
 
(321
)
 
(52
)
 
(373
)
 
(190
)
Present value of minimum obligation
 
$
1,550

 
193

 
1,743

 
81

Less current portion
 
 
 
 
 
(194
)
 
(4
)
Noncurrent operating and finance lease liabilities
 
 
 
 
 
$
1,549

 
$
77

 
 
 
 
 
 
 
 
 
Weighted-average remaining lease term in years
 
 
 
 
 
9.3

 
37.0

(a) 
Amounts do not include PPAs accounted for as executory contracts and/or contingent payments, such as energy payments on renewable PPAs.
(b) 
PPA operating leases contractually expire at various dates through 2033.
(c) 
Excludes certain amounts related to Xcel Energy’s 50% ownership interest in WYCO.
Operating lease liabilities at Dec. 31, 2019 include a present value of approximately $400 million for MEC PPA capacity payments. In 2020, these operating lease liabilities and related ROU assets will be eliminated from Xcel Energy’s consolidated balance sheet following the completed January 2020 purchase of MEC by a newly formed non-regulated subsidiary of Xcel Energy.
Commitments under operating and finance leases as of Dec. 31, 2018:
(Millions of Dollars)
 
PPA (a) (b)
Operating
Leases
 
Other Operating
Leases
 
Total
Operating
Leases
 
Finance Leases (c)
2019
 
$
207

 
$
32

 
$
239

 
$
14

2020
 
208

 
26

 
234

 
14

2021
 
210

 
25

 
235

 
14

2022
 
197

 
24

 
221

 
12

2023
 
186

 
22

 
208

 
12

Thereafter
 
883

 
154

 
1,037

 
220

Total minimum obligation
 


 


 


 
286

Interest component of obligation
 
 
 
 
 
 
 
(201
)
Present value of minimum obligation
 
 
 
 
 
$
85

(a) 
Amounts do not include PPAs accounted for as executory contracts and/or contingent payments, such as energy payments on renewable PPAs.
(b) 
PPA operating leases contractually expire at various dates through 2033.
(c) 
Excludes certain amounts related to Xcel Energy’s 50% ownership interest in WYCO.
Non-Lease PPAs NSP Minnesota, PSCo and SPS have entered into PPAs with other utilities and energy suppliers with various expiration dates through 2034 for purchased power to meet system load and energy requirements, operating reserve obligations and as part of wholesale and commodity trading activities. In general, these agreements provide for energy payments, based on actual energy delivered and capacity payments. Certain PPAs accounted for as executory contracts contain minimum energy purchase commitments, and total energy payments on those contracts were $102 million, $105 million and $100 million in 2019, 2018 and 2017, respectively.
Included in electric fuel and purchased power expenses for PPAs accounted for as executory contracts were payments for capacity of $86 million, $131 million and $168 million in 2019, 2018 and 2017, respectively.
Capacity and energy payments are contingent on the IPPs meeting contract obligations, including plant availability requirements. Certain contractual payments are adjusted based on market indices. The effects of price adjustments on financial results are mitigated through purchased energy cost recovery mechanisms.
At Dec. 31, 2019, the estimated future payments for capacity and energy that the utility subsidiaries of Xcel Energy are obligated to purchase pursuant to these executory contracts, subject to availability, were as follows:
(Millions of Dollars)
 
Capacity
 
Energy (a)
2020
 
$
70

 
$
110

2021
 
78

 
157

2022
 
77

 
173

2023
 
79

 
177

2024
 
74

 
182

Thereafter
 
56

 
146

Total
 
$
434

 
$
945

(a) 
Excludes contingent energy payments for renewable energy PPAs.
Fuel Contracts Xcel Energy has entered into various long-term commitments for the purchase and delivery of a significant portion of its coal, nuclear fuel and natural gas requirements. These contracts expire between 2020 and 2060. Xcel Energy is required to pay additional amounts depending on actual quantities shipped under these agreements.
Estimated minimum purchases under these contracts as of Dec. 31, 2019:
(Millions of Dollars)
 
Coal
 
Nuclear fuel
 
Natural gas supply
 
Natural gas supply and transportation
2020
 
$
430

 
$
54

 
$
343

 
$
295

2021
 
222

 
103

 
254

 
283

2022
 
135

 
85

 
104

 
269

2023
 
58

 
103

 
53

 
198

2024
 
24

 
74

 
3

 
153

Thereafter
 
74

 
275

 

 
860

Total
 
$
943

 
$
694

 
$
757

 
$
2,058


VIEs 
PPAs Under certain PPAs, NSP-Minnesota, PSCo and SPS purchase power from IPPs for which the utility subsidiaries are required to reimburse fuel costs, or to participate in tolling arrangements under which the utility subsidiaries procure the natural gas required to produce the energy that they purchase. Xcel Energy has determined that certain IPPs are VIEs. Xcel Energy is not subject to risk of loss from the operations of these entities, and no significant financial support is required other than contractual payments for energy and capacity.
In addition, certain solar PPAs provide an option to purchase emission allowances or sharing provisions related to production credits generated by the solar facility under contract. These specific PPAs create a variable interest in the IPP.
Xcel Energy evaluated each of these VIEs for possible consolidation, including review of qualitative factors such as the length and terms of the contract, control over O&M, control over dispatch of electricity, historical and estimated future fuel and electricity prices, and financing activities. Xcel Energy concluded that these entities are not required to be consolidated in its consolidated financial statements because it does not have the power to direct the activities that most significantly impact the entities’ economic performance.
The utility subsidiaries had approximately 3,986 MW and 3,770 MW of capacity under long-term PPAs at Dec. 31, 2019 and 2018, respectively, with entities that have been determined to be VIEs. Agreements have expiration dates through 2041.
Fuel Contracts — SPS purchases all of its coal requirements for its Harrington and Tolk plants from TUCO Inc. under contracts that will expire in December 2022. TUCO arranges for the purchase, receiving, transporting, unloading, handling, crushing, weighing and delivery of coal to meet SPS’ requirements. TUCO is responsible for negotiating and administering contracts with coal suppliers, transporters and handlers.
SPS has not provided any significant financial support to TUCO, other than contractual payments for delivered coal. However, the fuel contracts create a variable interest in TUCO due to SPS’ reimbursement of fuel procurement costs.
SPS has determined that TUCO is a VIE, however it has concluded that SPS is not the primary beneficiary of TUCO because it does not have the power to direct the activities that most significantly impact TUCO’s economic performance.
Low-Income Housing Limited Partnerships — Eloigne and NSP-Wisconsin have entered into limited partnerships for the construction and operation of affordable rental housing developments which qualify for low-income housing tax credits. Xcel Energy Inc. has determined Eloigne and NSP-Wisconsin’s low-income housing partnerships to be VIEs primarily due to contractual arrangements within each limited partnership that establish sharing of ongoing voting control and profits and losses that does not align with the partners’ proportional equity ownership.
Eloigne and NSP-Wisconsin have the power to direct the activities that most significantly impact these entities’ economic performance. Therefore, Xcel Energy Inc. consolidates these limited partnerships in its consolidated financial statements. Xcel Energy’s risk of loss for these partnerships is limited to its capital contributions, adjusted for any distributions and its share of undistributed profits and losses; no significant additional financial support has been, or is required to be, provided to the limited partnerships by Eloigne or NSP-Wisconsin.
Amounts reflected in Xcel Energy’s consolidated balance sheets for the Eloigne and NSP-Wisconsin low-income housing limited partnerships:
(Millions of Dollars)
 
Dec. 31, 2019
 
Dec. 31, 2018
Current assets
 
$
7

 
$
5

Property, plant and equipment, net
 
41

 
42

Other noncurrent assets
 
1

 
1

Total assets
 
$
49

 
$
48

 
 
 
 
 
Current liabilities
 
$
8

 
$
7

Mortgages and other long-term debt payable
 
26

 
26

Other noncurrent liabilities
 

 

Total liabilities
 
$
34

 
$
33


Other
Technology Agreements — Xcel Energy has a contract that extends through December 2022 with IBM for information technology services. The contract is cancelable at Xcel Energy’s option, although Xcel Energy would be obligated to pay 50% of the contract value for early termination. Xcel Energy capitalized or expensed $46 million, $81 million and $98 million associated with the IBM contract in 2019, 2018 and 2017, respectively.
Xcel Energy’s contract with Accenture for information technology services extends through December 2020. The contract is cancelable at Xcel Energy’s option, although there are financial penalties for early termination. Xcel Energy capitalized or expensed $52 million, $46 million and $16 million associated with the Accenture contract in 2019, 2018 and 2017, respectively.
During 2019, Xcel Energy executed a contract with Cognizant for information technology services which extends through 2022. The contract is cancelable at Xcel Energy’s option, although there are financial penalties for early termination. Xcel Energy capitalized or expensed $3 million associated with the Cognizant contract in 2019.
Committed minimum payments under these obligations:
(Millions of Dollars)
 
IBM Agreement
 
Accenture Agreement
 
Cognizant Agreement
2020
 
$
15

 
$
11

 
$
9

2021
 
15

 

 
7

2022
 
6

 

 
3

2023
 

 

 

2024
 

 

 

Thereafter
 

 

 


Guarantees and Bond Indemnifications Xcel Energy Inc. and its subsidiaries provide guarantees and bond indemnities, which guarantee payment or performance. Xcel Energy Inc.’s exposure is based upon the net liability under the specified agreements or transactions. Most of the guarantees and bond indemnities issued by Xcel Energy Inc. and its subsidiaries have a stated maximum amount. As of Dec. 31, 2019 and 2018, Xcel Energy Inc. and its subsidiaries had no assets held as collateral related to their guarantees, bond indemnities and indemnification agreements.
Guarantees and bond indemnities issued and outstanding for Xcel Energy were $62 million and $69 million as of Dec. 31, 2019 and 2018.