XML 123 R105.htm IDEA: XBRL DOCUMENT v3.3.1.900
Commitments and Contingencies, Environmental Contingencies - Site Contingencies (Details)
$ in Millions
1 Months Ended 12 Months Ended
Dec. 31, 2015
USD ($)
Site
Dec. 31, 2015
USD ($)
Site
Dec. 31, 2014
USD ($)
Ashland MGP Site | NSP-Wisconsin      
Manufactured Gas Plant (MGP) Site [Abstract]      
Accrual for Environmental Loss Contingencies, Gross $ 94.4 $ 94.4 $ 107.6
Number of properties included in superfund site which NSP-Wisconsin does not own | Site 2 2  
Liability for estimated cost of remediating sites, current $ 17.0 $ 17.0 28.9
Public Utilities, Annual recovery collected through base rates     4.7
Ashland MGP Site - Phase I Project Area | NSP-Wisconsin      
Manufactured Gas Plant (MGP) Site [Abstract]      
Accrual for Environmental Loss Contingencies, Gross 65.0 65.0  
Estimated amount spent on cleanup 47.0 $ 47.0  
Approved amortization period for recovery of remediation costs in natural gas rates (in years)   10 years  
Carrying cost percentage to be applied to unamortized regulatory asset   3.00%  
Ashland MGP Site - Sediments | NSP-Wisconsin      
Manufactured Gas Plant (MGP) Site [Abstract]      
Estimated cost of remediating site, low end of range 63.0 $ 63.0  
Estimated cost of remediating site, high end of range $ 77.0 $ 77.0  
Potential percent of increase to the high end of the range of estimated site remediation costs (in hundredths) 50.00% 50.00%  
Potential percent of decrease to the low end of the range of estimated site remediation costs (in hundredths) 30.00% 30.00%  
Fargo MGP Site | NSP-Minnesota      
Manufactured Gas Plant (MGP) Site [Abstract]      
Accrual for Environmental Loss Contingencies, Gross $ 2.7 $ 2.7  
Other MGP Sites      
Manufactured Gas Plant (MGP) Site [Abstract]      
Accrual for Environmental Loss Contingencies, Gross $ 2.1 $ 2.1 $ 2.1
Number of identified MGP sites under current investigation and/or remediation | Site 7 7  
Other PRPs | Ashland MGP Site | NSP-Wisconsin      
Manufactured Gas Plant (MGP) Site [Abstract]      
Number of PRPs that have contributed to remediation site   3  
Contributions to site cleanup by PRPs   $ 15.9  
PSCW Proceeding - Electric and Gas Rate Case 2016 - Gas Rates 2016 | Ashland MGP Site | NSP-Wisconsin      
Manufactured Gas Plant (MGP) Site [Abstract]      
Public Utilities, Approved annual recovery collected through base rates $ 7.6