Rate And Regulatory Matters
3 Months Ended
Mar. 31, 2012
Rate And Regulatory Matters

NOTE 2. RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Regulatory Assets

 

            See Note 2 to the financial statements in the Form 10-K for information regarding regulatory assets in the Utility business presented on the balance sheets of Entergy and the Registrant Subsidiaries.  Following are updates to that information.

 

Correction of Regulatory Asset for Income Taxes

 

In the first quarter 2012, Entergy Gulf States Louisiana determined that its regulatory asset for income taxes was overstated because of a difference between the regulatory treatment of the income taxes associated with certain items (primarily pension expense) and the financial accounting treatment of those taxes. Beginning with Louisiana retail rate filings using the 1994 test year, retail rates were developed using the normalization method of accounting for income taxes. With respect to these items, however, the financial accounting for income taxes was computed using the flow-through method of accounting. As a result, over the years Entergy Gulf States Louisiana accumulated a regulatory asset representing the expected future recovery of tax expense for the affected items even though the tax expense was being collected currently in rates from customers and would not be recovered in the future.

 

The effect was immaterial to the consolidated balance sheets, results of operations, and cash flows of Entergy for all prior reporting periods and on a cumulative basis. Therefore, a cumulative adjustment was recorded in the first quarter 2012 to remove the regulatory asset previously recorded. This adjustment increased 2012 income tax expense by $46.3 million, decreased the regulatory asset for income taxes by $75.3 million, and decreased accumulated deferred income taxes by $29 million.

 

            The effect was also immaterial to the balance sheets, results of operations, and cash flows of Entergy Gulf States Louisiana for all prior reporting periods.  Correcting the cumulative effect of the error in the first quarter 2012 could have been material to the 2012 results of operations of Entergy Gulf States Louisiana and, therefore, Entergy Gulf States Louisiana is revising its prior period financial statements to correct the errors.  The corrections affect the prior period financial statements as shown in the tables below:


 

 

Three Months Ended

March 31, 2011

 

As

previously reported

 


As

corrected

 

(In Thousands)

 

 

 

 

Income Statement

 

 

 

Income taxes

$25,852 

 

$24,903 

Net income

$45,670 

 

$46,619 

Earnings applicable to common equity

$45,464 

 

$46,413 

 

 

 

 

Statement of Cash Flows

 

 

 

Net income

$45,670 

 

$46,619 

Deferred income taxes, investment tax credits,
  and non-current taxes accrued


($25,336)

 


($26,285)

Changes in other regulatory assets

($15,701)

 

($17,243)

Other operating activities

$48,274 

 

$49,816 

 

 

December 31, 2011

 

As

previously reported

 


As

corrected

 

(In Thousands)

 

 

 

 

Balance Sheet

 

 

 

Regulatory asset for income taxes - net

$249,058 

 

$173,724 

Accumulated deferred income taxes - current

$5,427 

 

$5,107 

Accumulated deferred income taxes and taxes accrued

$1,397,230 

 

$1,368,563 

Member's equity

$1,439,733 

 

$1,393,386 

 

 

Three Months Ended

March 31, 2011

 

Member's Equity

 

Total Equity

 

As

previously reported

 


As

corrected

 

As

previously reported

 

 

As

corrected

 

(In Thousands)

 

 

 

 

 

 

 

 

Statement of Changes in Equity

 

 

 

Balance at December 31, 2010

$1,539,517

 

$1,494,593

 

$1,509,213

 

$1,464,289

Net income

$45,670

 

$46,619

 

$45,670

 

$46,619

Balance at March 31, 2011

$1,506,576

 

$1,462,601

 

$1,477,015

 

$1,433,040

 

Fuel and Purchased Power Cost Recovery

 

Entergy Texas

 

            In December 2011, Entergy Texas filed with the PUCT a request to refund approximately $43 million, including interest, of fuel cost recovery over-collections through October 2011.  Entergy Texas and the parties to the proceeding reached an agreement that Entergy Texas will refund $67 million, including interest and additional over-recoveries through December 2011, over a three-month period.  Entergy Texas and the parties requested that interim rates consistent with the settlement be approved effective with the March 2012 billing month, and the PUCT approved the application in March 2012.

 

Retail Rate Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for detailed information regarding retail rate proceedings involving the Utility operating companies.  The following are updates to the Form 10-K.

 

Filings with the LPSC

 

Retail Rates - Gas (Entergy Gulf States Louisiana)

 

            In January 2012, Entergy Gulf States Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2011.  The filing showed an earned return on common equity of 10.48%, which is within the earnings bandwidth of 10.5%, plus or minus fifty basis points.  In April 2012, the LPSC Staff filed its findings, suggesting adjustments that will produce an 11.54% earned return on common equity for the test year and a $0.1 million rate reduction.  Entergy Gulf States Louisiana accepted the LPSC Staff's recommendations, and the rate reduction will be effective with the first billing cycle of May 2012.

 

Filings with the MPSC

 

            In March 2012, Entergy Mississippi submitted its formula rate plan 2011 test year filing.  The filing shows an earned return on common equity of 10.92% for the test year, which is within the earnings bandwidth and results in no change in rates.  The filing is currently subject to MPSC review.

 

Filings with the PUCT and Texas Cities

 

            See the Form 10-K for a discussion of the rate case that Entergy Texas filed in November 2011 requesting a $112 million base rate increase reflecting a 10.6% return on common equity based on an adjusted June 2011 test year. On April 3, 2012 the PUCT Staff filed direct testimony recommending a base rate increase of $66 million and a 9.6% return on common equity.  The PUCT Staff, however, subsequently filed a statement of position in the proceeding indicating that it was still evaluating the position it will ultimately take in the case regarding the Entergy Texas's recovery of purchased power capacity costs and Entergy Texas's proposal to defer its MISO transition expenses.  On April 13, 2012, Entergy Texas filed rebuttal testimony indicating a revised request for a $105 million base rate increase.  A hearing was held in late-April through early-May 2012 and a decision is pending.

 

System Agreement Cost Equalization Proceedings

 

            See the Form 10-K for a discussion of the proceedings regarding the System Agreement, including the FERC's October 2011 order, Entergy's December 2011 compliance filing in response to that order, and Entergy Arkansas's February 2012 filing for an interim adjustment to its production cost allocation rider requesting that the $156 million payment be collected from customers over the 22-month period from March 2012 through December 2013.  In March 2012 the APSC issued an order stating that the payment can be recovered from retail customers through the production cost allocation rider, subject to refund.  The LPSC and the APSC have requested rehearing of the FERC's October 2011 order.  The APSC, LPSC, the PUCT, and other parties intervened in the December 2011 compliance filing proceeding, and the APSC and the LPSC also filed protests.

 

            On May 7, 2012, the FERC issued orders in several System Agreement proceedings, including an order on rehearing in the 2007 rate filing based on 2006 production costs proceeding, an order on the ALJ's initial decision in the 2009 rate filing based on 2008 production costs proceeding, and orders in other proceedings regarding the method of calculating the production costs used in the determination of the rough production cost equalization payments and receipts.  The May 7, 2012 FERC orders may result in the reallocation of costs among the Utility operating companies, although there are still FERC decisions pending in other System Agreement proceedings that could affect the rough production cost equalization payments and receipts, including for the 2007 rate filing.  The FERC directed Entergy, within 45 days of the issuance of a pending FERC order on rehearing regarding the functionalization of costs in the 2007 rate filing, to file a comprehensive bandwidth recalculation report showing updated payments and receipts in the 2007 rate filing proceeding.  In the order in the 2007 rate filing proceeding, the FERC also denied Entergy's request for rehearing regarding the AmerenUE contract and ordered Entergy Arkansas to refund to AmerenUE the rough production cost equalization payments collected from AmerenUE.  Under the terms of the FERC's order the refund is due in June 2012.  Entergy Arkansas had previously recorded a regulatory provision for the potential refund to AmerenUE.

 

Interruptible Load Proceeding

 

            See the Form 10-K for a discussion of the proceeding regarding the treatment under the System Agreement of the Utility operating companies' interruptible loads.  Entergy Arkansas filed an application in November 2010 with the APSC for recovery of the refund that it paid.  The APSC denied Entergy Arkansas's application, and also denied Entergy Arkansas's petition for rehearing.  If the FERC were to order Entergy Arkansas to pay refunds on rehearing in the interruptible load proceeding the APSC's decision would trap FERC-approved costs at Entergy Arkansas with no regulatory-approved mechanism to recover them.  In August 2011, Entergy Arkansas filed a complaint in the United States District Court for the Eastern District of Arkansas asking for a declaratory judgment that the rejection of Entergy Arkansas's application by the APSC is preempted by the Federal Power Act.  The APSC filed a motion to dismiss the complaint.  In April 2012 the United States district court dismissed Entergy Arkansas's complaint without prejudice stating that Entergy Arkansas's claim is not ripe for adjudication at this time.

 

Entergy Arkansas Opportunity Sales Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding commenced at the FERC by the LPSC.

 

Storm Cost Recovery Filings with Retail Regulators

 

Entergy Gulf States Louisiana

 

Hurricane Katrina and Hurricane Rita

 

See the Form 10-K for a discussion of Entergy Gulf States Louisiana's Act 55 financing of its Hurricane Katrina and Hurricane Rita storm costs. In February 2012, Entergy Gulf States Louisiana sold 500,000 of its Class A preferred membership units in Entergy Holdings Company LLC, a wholly-owned Entergy subsidiary, to a third party in exchange for $51 million plus accrued but unpaid distributions on the units. The 500,000 preferred membership units are mandatorily redeemable in January 2112.

 

New Nuclear Generation Development Costs (Entergy Gulf States and Entergy Louisiana)

 

            Entergy Gulf States Louisiana and Entergy Louisiana are developing a project option for new nuclear generation at River Bend.  In March 2010, Entergy Gulf States Louisiana and Entergy Louisiana filed with the LPSC seeking approval to continue the limited development activities necessary to preserve an option to construct a new unit at River Bend.  The testimony and legal briefs of the LPSC staff generally support the request of Entergy Gulf States Louisiana and Entergy Louisiana, although other parties filed briefs, without supporting testimony, in opposition to the request.  At an evidentiary hearing in October 2011, Entergy Gulf States Louisiana, Entergy Louisiana, and the LPSC staff presented testimony in support of certification of activities to preserve an option for a new nuclear plant at River Bend.  The ALJ recommended, however, that the LPSC decline the request of Entergy Gulf States Louisiana and Entergy Louisiana on the basis that the LPSC's rule on new nuclear development does not apply to activities to preserve an option to develop and on the further grounds that the companies improperly engaged in advanced preparation activities prior to certification.  There has been no suggestion that the planning activities or costs incurred were imprudent.  Entergy Gulf States Louisiana and Entergy Louisiana have requested oral argument before the LPSC.

 

Texas Power Price Lawsuit

 

In August 2003, a lawsuit was filed in the district court of Chambers County, Texas by Texas residents on behalf of a purported class apparently of the Texas retail customers of Entergy Gulf States, Inc. who were billed and paid for electric power from January 1, 1994 to the present. The named defendants include Entergy Corporation, Entergy Services, Entergy Power, Entergy Power Marketing Corp., and Entergy Arkansas. Entergy Gulf States, Inc. was not a named defendant, but was alleged to be a co-conspirator. The court granted the request of Entergy Gulf States, Inc. to intervene in the lawsuit to protect its interests.

 

Plaintiffs allege that the defendants implemented a "price gouging accounting scheme" to sell to plaintiffs and similarly situated utility customers higher priced power generated by the defendants while rejecting and/or reselling to off-system utilities less expensive power offered and/or purchased from off-system suppliers and/or generated by the Entergy system. In particular, plaintiffs allege that the defendants manipulated and continue to manipulate the dispatch of generation so that power is purchased from affiliated expensive resources instead of buying cheaper off-system power.

 

Plaintiffs stated in their pleadings that customers in Texas were charged at least $57 million above prevailing market prices for power. Plaintiffs seek actual, consequential and exemplary damages, costs and attorneys' fees, and disgorgement of profits. The plaintiffs' experts have tendered a report calculating damages in a large range, from $153 million to $972 million in present value, under various scenarios. The Entergy defendants have tendered expert reports challenging the assumptions, methodologies, and conclusions of the plaintiffs' expert reports.

 

The case is pending in state district court, and in March 2012 the court found that the case met the requirements to be maintained as a class action under Texas law.  On April 30, 2012, the court entered an order certifying the class.

Entergy Arkansas [Member]
 
Rate And Regulatory Matters

NOTE 2. RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Regulatory Assets

 

            See Note 2 to the financial statements in the Form 10-K for information regarding regulatory assets in the Utility business presented on the balance sheets of Entergy and the Registrant Subsidiaries.  Following are updates to that information.

 

Correction of Regulatory Asset for Income Taxes

 

In the first quarter 2012, Entergy Gulf States Louisiana determined that its regulatory asset for income taxes was overstated because of a difference between the regulatory treatment of the income taxes associated with certain items (primarily pension expense) and the financial accounting treatment of those taxes. Beginning with Louisiana retail rate filings using the 1994 test year, retail rates were developed using the normalization method of accounting for income taxes. With respect to these items, however, the financial accounting for income taxes was computed using the flow-through method of accounting. As a result, over the years Entergy Gulf States Louisiana accumulated a regulatory asset representing the expected future recovery of tax expense for the affected items even though the tax expense was being collected currently in rates from customers and would not be recovered in the future.

 

The effect was immaterial to the consolidated balance sheets, results of operations, and cash flows of Entergy for all prior reporting periods and on a cumulative basis. Therefore, a cumulative adjustment was recorded in the first quarter 2012 to remove the regulatory asset previously recorded. This adjustment increased 2012 income tax expense by $46.3 million, decreased the regulatory asset for income taxes by $75.3 million, and decreased accumulated deferred income taxes by $29 million.

 

            The effect was also immaterial to the balance sheets, results of operations, and cash flows of Entergy Gulf States Louisiana for all prior reporting periods.  Correcting the cumulative effect of the error in the first quarter 2012 could have been material to the 2012 results of operations of Entergy Gulf States Louisiana and, therefore, Entergy Gulf States Louisiana is revising its prior period financial statements to correct the errors.  The corrections affect the prior period financial statements as shown in the tables below:


 

 

Three Months Ended

March 31, 2011

 

As

previously reported

 


As

corrected

 

(In Thousands)

 

 

 

 

Income Statement

 

 

 

Income taxes

$25,852 

 

$24,903 

Net income

$45,670 

 

$46,619 

Earnings applicable to common equity

$45,464 

 

$46,413 

 

 

 

 

Statement of Cash Flows

 

 

 

Net income

$45,670 

 

$46,619 

Deferred income taxes, investment tax credits,
  and non-current taxes accrued


($25,336)

 


($26,285)

Changes in other regulatory assets

($15,701)

 

($17,243)

Other operating activities

$48,274 

 

$49,816 

 

 

December 31, 2011

 

As

previously reported

 


As

corrected

 

(In Thousands)

 

 

 

 

Balance Sheet

 

 

 

Regulatory asset for income taxes - net

$249,058 

 

$173,724 

Accumulated deferred income taxes - current

$5,427 

 

$5,107 

Accumulated deferred income taxes and taxes accrued

$1,397,230 

 

$1,368,563 

Member's equity

$1,439,733 

 

$1,393,386 

 

 

Three Months Ended

March 31, 2011

 

Member's Equity

 

Total Equity

 

As

previously reported

 


As

corrected

 

As

previously reported

 

 

As

corrected

 

(In Thousands)

 

 

 

 

 

 

 

 

Statement of Changes in Equity

 

 

 

Balance at December 31, 2010

$1,539,517

 

$1,494,593

 

$1,509,213

 

$1,464,289

Net income

$45,670

 

$46,619

 

$45,670

 

$46,619

Balance at March 31, 2011

$1,506,576

 

$1,462,601

 

$1,477,015

 

$1,433,040

 

Fuel and Purchased Power Cost Recovery

 

Entergy Texas

 

            In December 2011, Entergy Texas filed with the PUCT a request to refund approximately $43 million, including interest, of fuel cost recovery over-collections through October 2011.  Entergy Texas and the parties to the proceeding reached an agreement that Entergy Texas will refund $67 million, including interest and additional over-recoveries through December 2011, over a three-month period.  Entergy Texas and the parties requested that interim rates consistent with the settlement be approved effective with the March 2012 billing month, and the PUCT approved the application in March 2012.

 

Retail Rate Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for detailed information regarding retail rate proceedings involving the Utility operating companies.  The following are updates to the Form 10-K.

 

Filings with the LPSC

 

Retail Rates - Gas (Entergy Gulf States Louisiana)

 

            In January 2012, Entergy Gulf States Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2011.  The filing showed an earned return on common equity of 10.48%, which is within the earnings bandwidth of 10.5%, plus or minus fifty basis points.  In April 2012, the LPSC Staff filed its findings, suggesting adjustments that will produce an 11.54% earned return on common equity for the test year and a $0.1 million rate reduction.  Entergy Gulf States Louisiana accepted the LPSC Staff's recommendations, and the rate reduction will be effective with the first billing cycle of May 2012.

 

Filings with the MPSC

 

            In March 2012, Entergy Mississippi submitted its formula rate plan 2011 test year filing.  The filing shows an earned return on common equity of 10.92% for the test year, which is within the earnings bandwidth and results in no change in rates.  The filing is currently subject to MPSC review.

 

Filings with the PUCT and Texas Cities

 

            See the Form 10-K for a discussion of the rate case that Entergy Texas filed in November 2011 requesting a $112 million base rate increase reflecting a 10.6% return on common equity based on an adjusted June 2011 test year. On April 3, 2012 the PUCT Staff filed direct testimony recommending a base rate increase of $66 million and a 9.6% return on common equity.  The PUCT Staff, however, subsequently filed a statement of position in the proceeding indicating that it was still evaluating the position it will ultimately take in the case regarding the Entergy Texas's recovery of purchased power capacity costs and Entergy Texas's proposal to defer its MISO transition expenses.  On April 13, 2012, Entergy Texas filed rebuttal testimony indicating a revised request for a $105 million base rate increase.  A hearing was held in late-April through early-May 2012 and a decision is pending.

 

System Agreement Cost Equalization Proceedings

 

            See the Form 10-K for a discussion of the proceedings regarding the System Agreement, including the FERC's October 2011 order, Entergy's December 2011 compliance filing in response to that order, and Entergy Arkansas's February 2012 filing for an interim adjustment to its production cost allocation rider requesting that the $156 million payment be collected from customers over the 22-month period from March 2012 through December 2013.  In March 2012 the APSC issued an order stating that the payment can be recovered from retail customers through the production cost allocation rider, subject to refund.  The LPSC and the APSC have requested rehearing of the FERC's October 2011 order.  The APSC, LPSC, the PUCT, and other parties intervened in the December 2011 compliance filing proceeding, and the APSC and the LPSC also filed protests.

 

            On May 7, 2012, the FERC issued orders in several System Agreement proceedings, including an order on rehearing in the 2007 rate filing based on 2006 production costs proceeding, an order on the ALJ's initial decision in the 2009 rate filing based on 2008 production costs proceeding, and orders in other proceedings regarding the method of calculating the production costs used in the determination of the rough production cost equalization payments and receipts.  The May 7, 2012 FERC orders may result in the reallocation of costs among the Utility operating companies, although there are still FERC decisions pending in other System Agreement proceedings that could affect the rough production cost equalization payments and receipts, including for the 2007 rate filing.  The FERC directed Entergy, within 45 days of the issuance of a pending FERC order on rehearing regarding the functionalization of costs in the 2007 rate filing, to file a comprehensive bandwidth recalculation report showing updated payments and receipts in the 2007 rate filing proceeding.  In the order in the 2007 rate filing proceeding, the FERC also denied Entergy's request for rehearing regarding the AmerenUE contract and ordered Entergy Arkansas to refund to AmerenUE the rough production cost equalization payments collected from AmerenUE.  Under the terms of the FERC's order the refund is due in June 2012.  Entergy Arkansas had previously recorded a regulatory provision for the potential refund to AmerenUE.

 

Interruptible Load Proceeding

 

            See the Form 10-K for a discussion of the proceeding regarding the treatment under the System Agreement of the Utility operating companies' interruptible loads.  Entergy Arkansas filed an application in November 2010 with the APSC for recovery of the refund that it paid.  The APSC denied Entergy Arkansas's application, and also denied Entergy Arkansas's petition for rehearing.  If the FERC were to order Entergy Arkansas to pay refunds on rehearing in the interruptible load proceeding the APSC's decision would trap FERC-approved costs at Entergy Arkansas with no regulatory-approved mechanism to recover them.  In August 2011, Entergy Arkansas filed a complaint in the United States District Court for the Eastern District of Arkansas asking for a declaratory judgment that the rejection of Entergy Arkansas's application by the APSC is preempted by the Federal Power Act.  The APSC filed a motion to dismiss the complaint.  In April 2012 the United States district court dismissed Entergy Arkansas's complaint without prejudice stating that Entergy Arkansas's claim is not ripe for adjudication at this time.

 

Entergy Arkansas Opportunity Sales Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding commenced at the FERC by the LPSC.

 

Storm Cost Recovery Filings with Retail Regulators

 

Entergy Gulf States Louisiana

 

Hurricane Katrina and Hurricane Rita

 

See the Form 10-K for a discussion of Entergy Gulf States Louisiana's Act 55 financing of its Hurricane Katrina and Hurricane Rita storm costs. In February 2012, Entergy Gulf States Louisiana sold 500,000 of its Class A preferred membership units in Entergy Holdings Company LLC, a wholly-owned Entergy subsidiary, to a third party in exchange for $51 million plus accrued but unpaid distributions on the units. The 500,000 preferred membership units are mandatorily redeemable in January 2112.

 

New Nuclear Generation Development Costs (Entergy Gulf States and Entergy Louisiana)

 

            Entergy Gulf States Louisiana and Entergy Louisiana are developing a project option for new nuclear generation at River Bend.  In March 2010, Entergy Gulf States Louisiana and Entergy Louisiana filed with the LPSC seeking approval to continue the limited development activities necessary to preserve an option to construct a new unit at River Bend.  The testimony and legal briefs of the LPSC staff generally support the request of Entergy Gulf States Louisiana and Entergy Louisiana, although other parties filed briefs, without supporting testimony, in opposition to the request.  At an evidentiary hearing in October 2011, Entergy Gulf States Louisiana, Entergy Louisiana, and the LPSC staff presented testimony in support of certification of activities to preserve an option for a new nuclear plant at River Bend.  The ALJ recommended, however, that the LPSC decline the request of Entergy Gulf States Louisiana and Entergy Louisiana on the basis that the LPSC's rule on new nuclear development does not apply to activities to preserve an option to develop and on the further grounds that the companies improperly engaged in advanced preparation activities prior to certification.  There has been no suggestion that the planning activities or costs incurred were imprudent.  Entergy Gulf States Louisiana and Entergy Louisiana have requested oral argument before the LPSC.

 

Texas Power Price Lawsuit

 

In August 2003, a lawsuit was filed in the district court of Chambers County, Texas by Texas residents on behalf of a purported class apparently of the Texas retail customers of Entergy Gulf States, Inc. who were billed and paid for electric power from January 1, 1994 to the present. The named defendants include Entergy Corporation, Entergy Services, Entergy Power, Entergy Power Marketing Corp., and Entergy Arkansas. Entergy Gulf States, Inc. was not a named defendant, but was alleged to be a co-conspirator. The court granted the request of Entergy Gulf States, Inc. to intervene in the lawsuit to protect its interests.

 

Plaintiffs allege that the defendants implemented a "price gouging accounting scheme" to sell to plaintiffs and similarly situated utility customers higher priced power generated by the defendants while rejecting and/or reselling to off-system utilities less expensive power offered and/or purchased from off-system suppliers and/or generated by the Entergy system. In particular, plaintiffs allege that the defendants manipulated and continue to manipulate the dispatch of generation so that power is purchased from affiliated expensive resources instead of buying cheaper off-system power.

 

Plaintiffs stated in their pleadings that customers in Texas were charged at least $57 million above prevailing market prices for power. Plaintiffs seek actual, consequential and exemplary damages, costs and attorneys' fees, and disgorgement of profits. The plaintiffs' experts have tendered a report calculating damages in a large range, from $153 million to $972 million in present value, under various scenarios. The Entergy defendants have tendered expert reports challenging the assumptions, methodologies, and conclusions of the plaintiffs' expert reports.

 

The case is pending in state district court, and in March 2012 the court found that the case met the requirements to be maintained as a class action under Texas law.  On April 30, 2012, the court entered an order certifying the class.

Entergy Gulf States Louisiana [Member]
 
Rate And Regulatory Matters

NOTE 2. RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Regulatory Assets

 

            See Note 2 to the financial statements in the Form 10-K for information regarding regulatory assets in the Utility business presented on the balance sheets of Entergy and the Registrant Subsidiaries.  Following are updates to that information.

 

Correction of Regulatory Asset for Income Taxes

 

In the first quarter 2012, Entergy Gulf States Louisiana determined that its regulatory asset for income taxes was overstated because of a difference between the regulatory treatment of the income taxes associated with certain items (primarily pension expense) and the financial accounting treatment of those taxes. Beginning with Louisiana retail rate filings using the 1994 test year, retail rates were developed using the normalization method of accounting for income taxes. With respect to these items, however, the financial accounting for income taxes was computed using the flow-through method of accounting. As a result, over the years Entergy Gulf States Louisiana accumulated a regulatory asset representing the expected future recovery of tax expense for the affected items even though the tax expense was being collected currently in rates from customers and would not be recovered in the future.

 

The effect was immaterial to the consolidated balance sheets, results of operations, and cash flows of Entergy for all prior reporting periods and on a cumulative basis. Therefore, a cumulative adjustment was recorded in the first quarter 2012 to remove the regulatory asset previously recorded. This adjustment increased 2012 income tax expense by $46.3 million, decreased the regulatory asset for income taxes by $75.3 million, and decreased accumulated deferred income taxes by $29 million.

 

            The effect was also immaterial to the balance sheets, results of operations, and cash flows of Entergy Gulf States Louisiana for all prior reporting periods.  Correcting the cumulative effect of the error in the first quarter 2012 could have been material to the 2012 results of operations of Entergy Gulf States Louisiana and, therefore, Entergy Gulf States Louisiana is revising its prior period financial statements to correct the errors.  The corrections affect the prior period financial statements as shown in the tables below:


 

 

Three Months Ended

March 31, 2011

 

As

previously reported

 


As

corrected

 

(In Thousands)

 

 

 

 

Income Statement

 

 

 

Income taxes

$25,852 

 

$24,903 

Net income

$45,670 

 

$46,619 

Earnings applicable to common equity

$45,464 

 

$46,413 

 

 

 

 

Statement of Cash Flows

 

 

 

Net income

$45,670 

 

$46,619 

Deferred income taxes, investment tax credits,
  and non-current taxes accrued


($25,336)

 


($26,285)

Changes in other regulatory assets

($15,701)

 

($17,243)

Other operating activities

$48,274 

 

$49,816 

 

 

December 31, 2011

 

As

previously reported

 


As

corrected

 

(In Thousands)

 

 

 

 

Balance Sheet

 

 

 

Regulatory asset for income taxes - net

$249,058 

 

$173,724 

Accumulated deferred income taxes - current

$5,427 

 

$5,107 

Accumulated deferred income taxes and taxes accrued

$1,397,230 

 

$1,368,563 

Member's equity

$1,439,733 

 

$1,393,386 

 

 

Three Months Ended

March 31, 2011

 

Member's Equity

 

Total Equity

 

As

previously reported

 


As

corrected

 

As

previously reported

 

 

As

corrected

 

(In Thousands)

 

 

 

 

 

 

 

 

Statement of Changes in Equity

 

 

 

Balance at December 31, 2010

$1,539,517

 

$1,494,593

 

$1,509,213

 

$1,464,289

Net income

$45,670

 

$46,619

 

$45,670

 

$46,619

Balance at March 31, 2011

$1,506,576

 

$1,462,601

 

$1,477,015

 

$1,433,040

 

Fuel and Purchased Power Cost Recovery

 

Entergy Texas

 

            In December 2011, Entergy Texas filed with the PUCT a request to refund approximately $43 million, including interest, of fuel cost recovery over-collections through October 2011.  Entergy Texas and the parties to the proceeding reached an agreement that Entergy Texas will refund $67 million, including interest and additional over-recoveries through December 2011, over a three-month period.  Entergy Texas and the parties requested that interim rates consistent with the settlement be approved effective with the March 2012 billing month, and the PUCT approved the application in March 2012.

 

Retail Rate Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for detailed information regarding retail rate proceedings involving the Utility operating companies.  The following are updates to the Form 10-K.

 

Filings with the LPSC

 

Retail Rates - Gas (Entergy Gulf States Louisiana)

 

            In January 2012, Entergy Gulf States Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2011.  The filing showed an earned return on common equity of 10.48%, which is within the earnings bandwidth of 10.5%, plus or minus fifty basis points.  In April 2012, the LPSC Staff filed its findings, suggesting adjustments that will produce an 11.54% earned return on common equity for the test year and a $0.1 million rate reduction.  Entergy Gulf States Louisiana accepted the LPSC Staff's recommendations, and the rate reduction will be effective with the first billing cycle of May 2012.

 

Filings with the MPSC

 

            In March 2012, Entergy Mississippi submitted its formula rate plan 2011 test year filing.  The filing shows an earned return on common equity of 10.92% for the test year, which is within the earnings bandwidth and results in no change in rates.  The filing is currently subject to MPSC review.

 

Filings with the PUCT and Texas Cities

 

            See the Form 10-K for a discussion of the rate case that Entergy Texas filed in November 2011 requesting a $112 million base rate increase reflecting a 10.6% return on common equity based on an adjusted June 2011 test year. On April 3, 2012 the PUCT Staff filed direct testimony recommending a base rate increase of $66 million and a 9.6% return on common equity.  The PUCT Staff, however, subsequently filed a statement of position in the proceeding indicating that it was still evaluating the position it will ultimately take in the case regarding the Entergy Texas's recovery of purchased power capacity costs and Entergy Texas's proposal to defer its MISO transition expenses.  On April 13, 2012, Entergy Texas filed rebuttal testimony indicating a revised request for a $105 million base rate increase.  A hearing was held in late-April through early-May 2012 and a decision is pending.

 

System Agreement Cost Equalization Proceedings

 

            See the Form 10-K for a discussion of the proceedings regarding the System Agreement, including the FERC's October 2011 order, Entergy's December 2011 compliance filing in response to that order, and Entergy Arkansas's February 2012 filing for an interim adjustment to its production cost allocation rider requesting that the $156 million payment be collected from customers over the 22-month period from March 2012 through December 2013.  In March 2012 the APSC issued an order stating that the payment can be recovered from retail customers through the production cost allocation rider, subject to refund.  The LPSC and the APSC have requested rehearing of the FERC's October 2011 order.  The APSC, LPSC, the PUCT, and other parties intervened in the December 2011 compliance filing proceeding, and the APSC and the LPSC also filed protests.

 

            On May 7, 2012, the FERC issued orders in several System Agreement proceedings, including an order on rehearing in the 2007 rate filing based on 2006 production costs proceeding, an order on the ALJ's initial decision in the 2009 rate filing based on 2008 production costs proceeding, and orders in other proceedings regarding the method of calculating the production costs used in the determination of the rough production cost equalization payments and receipts.  The May 7, 2012 FERC orders may result in the reallocation of costs among the Utility operating companies, although there are still FERC decisions pending in other System Agreement proceedings that could affect the rough production cost equalization payments and receipts, including for the 2007 rate filing.  The FERC directed Entergy, within 45 days of the issuance of a pending FERC order on rehearing regarding the functionalization of costs in the 2007 rate filing, to file a comprehensive bandwidth recalculation report showing updated payments and receipts in the 2007 rate filing proceeding.  In the order in the 2007 rate filing proceeding, the FERC also denied Entergy's request for rehearing regarding the AmerenUE contract and ordered Entergy Arkansas to refund to AmerenUE the rough production cost equalization payments collected from AmerenUE.  Under the terms of the FERC's order the refund is due in June 2012.  Entergy Arkansas had previously recorded a regulatory provision for the potential refund to AmerenUE.

 

Interruptible Load Proceeding

 

            See the Form 10-K for a discussion of the proceeding regarding the treatment under the System Agreement of the Utility operating companies' interruptible loads.  Entergy Arkansas filed an application in November 2010 with the APSC for recovery of the refund that it paid.  The APSC denied Entergy Arkansas's application, and also denied Entergy Arkansas's petition for rehearing.  If the FERC were to order Entergy Arkansas to pay refunds on rehearing in the interruptible load proceeding the APSC's decision would trap FERC-approved costs at Entergy Arkansas with no regulatory-approved mechanism to recover them.  In August 2011, Entergy Arkansas filed a complaint in the United States District Court for the Eastern District of Arkansas asking for a declaratory judgment that the rejection of Entergy Arkansas's application by the APSC is preempted by the Federal Power Act.  The APSC filed a motion to dismiss the complaint.  In April 2012 the United States district court dismissed Entergy Arkansas's complaint without prejudice stating that Entergy Arkansas's claim is not ripe for adjudication at this time.

 

Entergy Arkansas Opportunity Sales Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding commenced at the FERC by the LPSC.

 

Storm Cost Recovery Filings with Retail Regulators

 

Entergy Gulf States Louisiana

 

Hurricane Katrina and Hurricane Rita

 

See the Form 10-K for a discussion of Entergy Gulf States Louisiana's Act 55 financing of its Hurricane Katrina and Hurricane Rita storm costs. In February 2012, Entergy Gulf States Louisiana sold 500,000 of its Class A preferred membership units in Entergy Holdings Company LLC, a wholly-owned Entergy subsidiary, to a third party in exchange for $51 million plus accrued but unpaid distributions on the units. The 500,000 preferred membership units are mandatorily redeemable in January 2112.

 

New Nuclear Generation Development Costs (Entergy Gulf States and Entergy Louisiana)

 

            Entergy Gulf States Louisiana and Entergy Louisiana are developing a project option for new nuclear generation at River Bend.  In March 2010, Entergy Gulf States Louisiana and Entergy Louisiana filed with the LPSC seeking approval to continue the limited development activities necessary to preserve an option to construct a new unit at River Bend.  The testimony and legal briefs of the LPSC staff generally support the request of Entergy Gulf States Louisiana and Entergy Louisiana, although other parties filed briefs, without supporting testimony, in opposition to the request.  At an evidentiary hearing in October 2011, Entergy Gulf States Louisiana, Entergy Louisiana, and the LPSC staff presented testimony in support of certification of activities to preserve an option for a new nuclear plant at River Bend.  The ALJ recommended, however, that the LPSC decline the request of Entergy Gulf States Louisiana and Entergy Louisiana on the basis that the LPSC's rule on new nuclear development does not apply to activities to preserve an option to develop and on the further grounds that the companies improperly engaged in advanced preparation activities prior to certification.  There has been no suggestion that the planning activities or costs incurred were imprudent.  Entergy Gulf States Louisiana and Entergy Louisiana have requested oral argument before the LPSC.

 

Texas Power Price Lawsuit

 

In August 2003, a lawsuit was filed in the district court of Chambers County, Texas by Texas residents on behalf of a purported class apparently of the Texas retail customers of Entergy Gulf States, Inc. who were billed and paid for electric power from January 1, 1994 to the present. The named defendants include Entergy Corporation, Entergy Services, Entergy Power, Entergy Power Marketing Corp., and Entergy Arkansas. Entergy Gulf States, Inc. was not a named defendant, but was alleged to be a co-conspirator. The court granted the request of Entergy Gulf States, Inc. to intervene in the lawsuit to protect its interests.

 

Plaintiffs allege that the defendants implemented a "price gouging accounting scheme" to sell to plaintiffs and similarly situated utility customers higher priced power generated by the defendants while rejecting and/or reselling to off-system utilities less expensive power offered and/or purchased from off-system suppliers and/or generated by the Entergy system. In particular, plaintiffs allege that the defendants manipulated and continue to manipulate the dispatch of generation so that power is purchased from affiliated expensive resources instead of buying cheaper off-system power.

 

Plaintiffs stated in their pleadings that customers in Texas were charged at least $57 million above prevailing market prices for power. Plaintiffs seek actual, consequential and exemplary damages, costs and attorneys' fees, and disgorgement of profits. The plaintiffs' experts have tendered a report calculating damages in a large range, from $153 million to $972 million in present value, under various scenarios. The Entergy defendants have tendered expert reports challenging the assumptions, methodologies, and conclusions of the plaintiffs' expert reports.

 

The case is pending in state district court, and in March 2012 the court found that the case met the requirements to be maintained as a class action under Texas law.  On April 30, 2012, the court entered an order certifying the class.

Entergy Louisiana [Member]
 
Rate And Regulatory Matters

NOTE 2. RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Regulatory Assets

 

            See Note 2 to the financial statements in the Form 10-K for information regarding regulatory assets in the Utility business presented on the balance sheets of Entergy and the Registrant Subsidiaries.  Following are updates to that information.

 

Correction of Regulatory Asset for Income Taxes

 

In the first quarter 2012, Entergy Gulf States Louisiana determined that its regulatory asset for income taxes was overstated because of a difference between the regulatory treatment of the income taxes associated with certain items (primarily pension expense) and the financial accounting treatment of those taxes. Beginning with Louisiana retail rate filings using the 1994 test year, retail rates were developed using the normalization method of accounting for income taxes. With respect to these items, however, the financial accounting for income taxes was computed using the flow-through method of accounting. As a result, over the years Entergy Gulf States Louisiana accumulated a regulatory asset representing the expected future recovery of tax expense for the affected items even though the tax expense was being collected currently in rates from customers and would not be recovered in the future.

 

The effect was immaterial to the consolidated balance sheets, results of operations, and cash flows of Entergy for all prior reporting periods and on a cumulative basis. Therefore, a cumulative adjustment was recorded in the first quarter 2012 to remove the regulatory asset previously recorded. This adjustment increased 2012 income tax expense by $46.3 million, decreased the regulatory asset for income taxes by $75.3 million, and decreased accumulated deferred income taxes by $29 million.

 

            The effect was also immaterial to the balance sheets, results of operations, and cash flows of Entergy Gulf States Louisiana for all prior reporting periods.  Correcting the cumulative effect of the error in the first quarter 2012 could have been material to the 2012 results of operations of Entergy Gulf States Louisiana and, therefore, Entergy Gulf States Louisiana is revising its prior period financial statements to correct the errors.  The corrections affect the prior period financial statements as shown in the tables below:


 

 

Three Months Ended

March 31, 2011

 

As

previously reported

 


As

corrected

 

(In Thousands)

 

 

 

 

Income Statement

 

 

 

Income taxes

$25,852 

 

$24,903 

Net income

$45,670 

 

$46,619 

Earnings applicable to common equity

$45,464 

 

$46,413 

 

 

 

 

Statement of Cash Flows

 

 

 

Net income

$45,670 

 

$46,619 

Deferred income taxes, investment tax credits,
  and non-current taxes accrued


($25,336)

 


($26,285)

Changes in other regulatory assets

($15,701)

 

($17,243)

Other operating activities

$48,274 

 

$49,816 

 

 

December 31, 2011

 

As

previously reported

 


As

corrected

 

(In Thousands)

 

 

 

 

Balance Sheet

 

 

 

Regulatory asset for income taxes - net

$249,058 

 

$173,724 

Accumulated deferred income taxes - current

$5,427 

 

$5,107 

Accumulated deferred income taxes and taxes accrued

$1,397,230 

 

$1,368,563 

Member's equity

$1,439,733 

 

$1,393,386 

 

 

Three Months Ended

March 31, 2011

 

Member's Equity

 

Total Equity

 

As

previously reported

 


As

corrected

 

As

previously reported

 

 

As

corrected

 

(In Thousands)

 

 

 

 

 

 

 

 

Statement of Changes in Equity

 

 

 

Balance at December 31, 2010

$1,539,517

 

$1,494,593

 

$1,509,213

 

$1,464,289

Net income

$45,670

 

$46,619

 

$45,670

 

$46,619

Balance at March 31, 2011

$1,506,576

 

$1,462,601

 

$1,477,015

 

$1,433,040

 

Fuel and Purchased Power Cost Recovery

 

Entergy Texas

 

            In December 2011, Entergy Texas filed with the PUCT a request to refund approximately $43 million, including interest, of fuel cost recovery over-collections through October 2011.  Entergy Texas and the parties to the proceeding reached an agreement that Entergy Texas will refund $67 million, including interest and additional over-recoveries through December 2011, over a three-month period.  Entergy Texas and the parties requested that interim rates consistent with the settlement be approved effective with the March 2012 billing month, and the PUCT approved the application in March 2012.

 

Retail Rate Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for detailed information regarding retail rate proceedings involving the Utility operating companies.  The following are updates to the Form 10-K.

 

Filings with the LPSC

 

Retail Rates - Gas (Entergy Gulf States Louisiana)

 

            In January 2012, Entergy Gulf States Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2011.  The filing showed an earned return on common equity of 10.48%, which is within the earnings bandwidth of 10.5%, plus or minus fifty basis points.  In April 2012, the LPSC Staff filed its findings, suggesting adjustments that will produce an 11.54% earned return on common equity for the test year and a $0.1 million rate reduction.  Entergy Gulf States Louisiana accepted the LPSC Staff's recommendations, and the rate reduction will be effective with the first billing cycle of May 2012.

 

Filings with the MPSC

 

            In March 2012, Entergy Mississippi submitted its formula rate plan 2011 test year filing.  The filing shows an earned return on common equity of 10.92% for the test year, which is within the earnings bandwidth and results in no change in rates.  The filing is currently subject to MPSC review.

 

Filings with the PUCT and Texas Cities

 

            See the Form 10-K for a discussion of the rate case that Entergy Texas filed in November 2011 requesting a $112 million base rate increase reflecting a 10.6% return on common equity based on an adjusted June 2011 test year. On April 3, 2012 the PUCT Staff filed direct testimony recommending a base rate increase of $66 million and a 9.6% return on common equity.  The PUCT Staff, however, subsequently filed a statement of position in the proceeding indicating that it was still evaluating the position it will ultimately take in the case regarding the Entergy Texas's recovery of purchased power capacity costs and Entergy Texas's proposal to defer its MISO transition expenses.  On April 13, 2012, Entergy Texas filed rebuttal testimony indicating a revised request for a $105 million base rate increase.  A hearing was held in late-April through early-May 2012 and a decision is pending.

 

System Agreement Cost Equalization Proceedings

 

            See the Form 10-K for a discussion of the proceedings regarding the System Agreement, including the FERC's October 2011 order, Entergy's December 2011 compliance filing in response to that order, and Entergy Arkansas's February 2012 filing for an interim adjustment to its production cost allocation rider requesting that the $156 million payment be collected from customers over the 22-month period from March 2012 through December 2013.  In March 2012 the APSC issued an order stating that the payment can be recovered from retail customers through the production cost allocation rider, subject to refund.  The LPSC and the APSC have requested rehearing of the FERC's October 2011 order.  The APSC, LPSC, the PUCT, and other parties intervened in the December 2011 compliance filing proceeding, and the APSC and the LPSC also filed protests.

 

            On May 7, 2012, the FERC issued orders in several System Agreement proceedings, including an order on rehearing in the 2007 rate filing based on 2006 production costs proceeding, an order on the ALJ's initial decision in the 2009 rate filing based on 2008 production costs proceeding, and orders in other proceedings regarding the method of calculating the production costs used in the determination of the rough production cost equalization payments and receipts.  The May 7, 2012 FERC orders may result in the reallocation of costs among the Utility operating companies, although there are still FERC decisions pending in other System Agreement proceedings that could affect the rough production cost equalization payments and receipts, including for the 2007 rate filing.  The FERC directed Entergy, within 45 days of the issuance of a pending FERC order on rehearing regarding the functionalization of costs in the 2007 rate filing, to file a comprehensive bandwidth recalculation report showing updated payments and receipts in the 2007 rate filing proceeding.  In the order in the 2007 rate filing proceeding, the FERC also denied Entergy's request for rehearing regarding the AmerenUE contract and ordered Entergy Arkansas to refund to AmerenUE the rough production cost equalization payments collected from AmerenUE.  Under the terms of the FERC's order the refund is due in June 2012.  Entergy Arkansas had previously recorded a regulatory provision for the potential refund to AmerenUE.

 

Interruptible Load Proceeding

 

            See the Form 10-K for a discussion of the proceeding regarding the treatment under the System Agreement of the Utility operating companies' interruptible loads.  Entergy Arkansas filed an application in November 2010 with the APSC for recovery of the refund that it paid.  The APSC denied Entergy Arkansas's application, and also denied Entergy Arkansas's petition for rehearing.  If the FERC were to order Entergy Arkansas to pay refunds on rehearing in the interruptible load proceeding the APSC's decision would trap FERC-approved costs at Entergy Arkansas with no regulatory-approved mechanism to recover them.  In August 2011, Entergy Arkansas filed a complaint in the United States District Court for the Eastern District of Arkansas asking for a declaratory judgment that the rejection of Entergy Arkansas's application by the APSC is preempted by the Federal Power Act.  The APSC filed a motion to dismiss the complaint.  In April 2012 the United States district court dismissed Entergy Arkansas's complaint without prejudice stating that Entergy Arkansas's claim is not ripe for adjudication at this time.

 

Entergy Arkansas Opportunity Sales Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding commenced at the FERC by the LPSC.

 

Storm Cost Recovery Filings with Retail Regulators

 

Entergy Gulf States Louisiana

 

Hurricane Katrina and Hurricane Rita

 

See the Form 10-K for a discussion of Entergy Gulf States Louisiana's Act 55 financing of its Hurricane Katrina and Hurricane Rita storm costs. In February 2012, Entergy Gulf States Louisiana sold 500,000 of its Class A preferred membership units in Entergy Holdings Company LLC, a wholly-owned Entergy subsidiary, to a third party in exchange for $51 million plus accrued but unpaid distributions on the units. The 500,000 preferred membership units are mandatorily redeemable in January 2112.

 

New Nuclear Generation Development Costs (Entergy Gulf States and Entergy Louisiana)

 

            Entergy Gulf States Louisiana and Entergy Louisiana are developing a project option for new nuclear generation at River Bend.  In March 2010, Entergy Gulf States Louisiana and Entergy Louisiana filed with the LPSC seeking approval to continue the limited development activities necessary to preserve an option to construct a new unit at River Bend.  The testimony and legal briefs of the LPSC staff generally support the request of Entergy Gulf States Louisiana and Entergy Louisiana, although other parties filed briefs, without supporting testimony, in opposition to the request.  At an evidentiary hearing in October 2011, Entergy Gulf States Louisiana, Entergy Louisiana, and the LPSC staff presented testimony in support of certification of activities to preserve an option for a new nuclear plant at River Bend.  The ALJ recommended, however, that the LPSC decline the request of Entergy Gulf States Louisiana and Entergy Louisiana on the basis that the LPSC's rule on new nuclear development does not apply to activities to preserve an option to develop and on the further grounds that the companies improperly engaged in advanced preparation activities prior to certification.  There has been no suggestion that the planning activities or costs incurred were imprudent.  Entergy Gulf States Louisiana and Entergy Louisiana have requested oral argument before the LPSC.

 

Texas Power Price Lawsuit

 

In August 2003, a lawsuit was filed in the district court of Chambers County, Texas by Texas residents on behalf of a purported class apparently of the Texas retail customers of Entergy Gulf States, Inc. who were billed and paid for electric power from January 1, 1994 to the present. The named defendants include Entergy Corporation, Entergy Services, Entergy Power, Entergy Power Marketing Corp., and Entergy Arkansas. Entergy Gulf States, Inc. was not a named defendant, but was alleged to be a co-conspirator. The court granted the request of Entergy Gulf States, Inc. to intervene in the lawsuit to protect its interests.

 

Plaintiffs allege that the defendants implemented a "price gouging accounting scheme" to sell to plaintiffs and similarly situated utility customers higher priced power generated by the defendants while rejecting and/or reselling to off-system utilities less expensive power offered and/or purchased from off-system suppliers and/or generated by the Entergy system. In particular, plaintiffs allege that the defendants manipulated and continue to manipulate the dispatch of generation so that power is purchased from affiliated expensive resources instead of buying cheaper off-system power.

 

Plaintiffs stated in their pleadings that customers in Texas were charged at least $57 million above prevailing market prices for power. Plaintiffs seek actual, consequential and exemplary damages, costs and attorneys' fees, and disgorgement of profits. The plaintiffs' experts have tendered a report calculating damages in a large range, from $153 million to $972 million in present value, under various scenarios. The Entergy defendants have tendered expert reports challenging the assumptions, methodologies, and conclusions of the plaintiffs' expert reports.

 

The case is pending in state district court, and in March 2012 the court found that the case met the requirements to be maintained as a class action under Texas law.  On April 30, 2012, the court entered an order certifying the class.

Entergy Mississippi [Member]
 
Rate And Regulatory Matters

NOTE 2. RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Regulatory Assets

 

            See Note 2 to the financial statements in the Form 10-K for information regarding regulatory assets in the Utility business presented on the balance sheets of Entergy and the Registrant Subsidiaries.  Following are updates to that information.

 

Correction of Regulatory Asset for Income Taxes

 

In the first quarter 2012, Entergy Gulf States Louisiana determined that its regulatory asset for income taxes was overstated because of a difference between the regulatory treatment of the income taxes associated with certain items (primarily pension expense) and the financial accounting treatment of those taxes. Beginning with Louisiana retail rate filings using the 1994 test year, retail rates were developed using the normalization method of accounting for income taxes. With respect to these items, however, the financial accounting for income taxes was computed using the flow-through method of accounting. As a result, over the years Entergy Gulf States Louisiana accumulated a regulatory asset representing the expected future recovery of tax expense for the affected items even though the tax expense was being collected currently in rates from customers and would not be recovered in the future.

 

The effect was immaterial to the consolidated balance sheets, results of operations, and cash flows of Entergy for all prior reporting periods and on a cumulative basis. Therefore, a cumulative adjustment was recorded in the first quarter 2012 to remove the regulatory asset previously recorded. This adjustment increased 2012 income tax expense by $46.3 million, decreased the regulatory asset for income taxes by $75.3 million, and decreased accumulated deferred income taxes by $29 million.

 

            The effect was also immaterial to the balance sheets, results of operations, and cash flows of Entergy Gulf States Louisiana for all prior reporting periods.  Correcting the cumulative effect of the error in the first quarter 2012 could have been material to the 2012 results of operations of Entergy Gulf States Louisiana and, therefore, Entergy Gulf States Louisiana is revising its prior period financial statements to correct the errors.  The corrections affect the prior period financial statements as shown in the tables below:


 

 

Three Months Ended

March 31, 2011

 

As

previously reported

 


As

corrected

 

(In Thousands)

 

 

 

 

Income Statement

 

 

 

Income taxes

$25,852 

 

$24,903 

Net income

$45,670 

 

$46,619 

Earnings applicable to common equity

$45,464 

 

$46,413 

 

 

 

 

Statement of Cash Flows

 

 

 

Net income

$45,670 

 

$46,619 

Deferred income taxes, investment tax credits,
  and non-current taxes accrued


($25,336)

 


($26,285)

Changes in other regulatory assets

($15,701)

 

($17,243)

Other operating activities

$48,274 

 

$49,816 

 

 

December 31, 2011

 

As

previously reported

 


As

corrected

 

(In Thousands)

 

 

 

 

Balance Sheet

 

 

 

Regulatory asset for income taxes - net

$249,058 

 

$173,724 

Accumulated deferred income taxes - current

$5,427 

 

$5,107 

Accumulated deferred income taxes and taxes accrued

$1,397,230 

 

$1,368,563 

Member's equity

$1,439,733 

 

$1,393,386 

 

 

Three Months Ended

March 31, 2011

 

Member's Equity

 

Total Equity

 

As

previously reported

 


As

corrected

 

As

previously reported

 

 

As

corrected

 

(In Thousands)

 

 

 

 

 

 

 

 

Statement of Changes in Equity

 

 

 

Balance at December 31, 2010

$1,539,517

 

$1,494,593

 

$1,509,213

 

$1,464,289

Net income

$45,670

 

$46,619

 

$45,670

 

$46,619

Balance at March 31, 2011

$1,506,576

 

$1,462,601

 

$1,477,015

 

$1,433,040

 

Fuel and Purchased Power Cost Recovery

 

Entergy Texas

 

            In December 2011, Entergy Texas filed with the PUCT a request to refund approximately $43 million, including interest, of fuel cost recovery over-collections through October 2011.  Entergy Texas and the parties to the proceeding reached an agreement that Entergy Texas will refund $67 million, including interest and additional over-recoveries through December 2011, over a three-month period.  Entergy Texas and the parties requested that interim rates consistent with the settlement be approved effective with the March 2012 billing month, and the PUCT approved the application in March 2012.

 

Retail Rate Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for detailed information regarding retail rate proceedings involving the Utility operating companies.  The following are updates to the Form 10-K.

 

Filings with the LPSC

 

Retail Rates - Gas (Entergy Gulf States Louisiana)

 

            In January 2012, Entergy Gulf States Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2011.  The filing showed an earned return on common equity of 10.48%, which is within the earnings bandwidth of 10.5%, plus or minus fifty basis points.  In April 2012, the LPSC Staff filed its findings, suggesting adjustments that will produce an 11.54% earned return on common equity for the test year and a $0.1 million rate reduction.  Entergy Gulf States Louisiana accepted the LPSC Staff's recommendations, and the rate reduction will be effective with the first billing cycle of May 2012.

 

Filings with the MPSC

 

            In March 2012, Entergy Mississippi submitted its formula rate plan 2011 test year filing.  The filing shows an earned return on common equity of 10.92% for the test year, which is within the earnings bandwidth and results in no change in rates.  The filing is currently subject to MPSC review.

 

Filings with the PUCT and Texas Cities

 

            See the Form 10-K for a discussion of the rate case that Entergy Texas filed in November 2011 requesting a $112 million base rate increase reflecting a 10.6% return on common equity based on an adjusted June 2011 test year. On April 3, 2012 the PUCT Staff filed direct testimony recommending a base rate increase of $66 million and a 9.6% return on common equity.  The PUCT Staff, however, subsequently filed a statement of position in the proceeding indicating that it was still evaluating the position it will ultimately take in the case regarding the Entergy Texas's recovery of purchased power capacity costs and Entergy Texas's proposal to defer its MISO transition expenses.  On April 13, 2012, Entergy Texas filed rebuttal testimony indicating a revised request for a $105 million base rate increase.  A hearing was held in late-April through early-May 2012 and a decision is pending.

 

System Agreement Cost Equalization Proceedings

 

            See the Form 10-K for a discussion of the proceedings regarding the System Agreement, including the FERC's October 2011 order, Entergy's December 2011 compliance filing in response to that order, and Entergy Arkansas's February 2012 filing for an interim adjustment to its production cost allocation rider requesting that the $156 million payment be collected from customers over the 22-month period from March 2012 through December 2013.  In March 2012 the APSC issued an order stating that the payment can be recovered from retail customers through the production cost allocation rider, subject to refund.  The LPSC and the APSC have requested rehearing of the FERC's October 2011 order.  The APSC, LPSC, the PUCT, and other parties intervened in the December 2011 compliance filing proceeding, and the APSC and the LPSC also filed protests.

 

            On May 7, 2012, the FERC issued orders in several System Agreement proceedings, including an order on rehearing in the 2007 rate filing based on 2006 production costs proceeding, an order on the ALJ's initial decision in the 2009 rate filing based on 2008 production costs proceeding, and orders in other proceedings regarding the method of calculating the production costs used in the determination of the rough production cost equalization payments and receipts.  The May 7, 2012 FERC orders may result in the reallocation of costs among the Utility operating companies, although there are still FERC decisions pending in other System Agreement proceedings that could affect the rough production cost equalization payments and receipts, including for the 2007 rate filing.  The FERC directed Entergy, within 45 days of the issuance of a pending FERC order on rehearing regarding the functionalization of costs in the 2007 rate filing, to file a comprehensive bandwidth recalculation report showing updated payments and receipts in the 2007 rate filing proceeding.  In the order in the 2007 rate filing proceeding, the FERC also denied Entergy's request for rehearing regarding the AmerenUE contract and ordered Entergy Arkansas to refund to AmerenUE the rough production cost equalization payments collected from AmerenUE.  Under the terms of the FERC's order the refund is due in June 2012.  Entergy Arkansas had previously recorded a regulatory provision for the potential refund to AmerenUE.

 

Interruptible Load Proceeding

 

            See the Form 10-K for a discussion of the proceeding regarding the treatment under the System Agreement of the Utility operating companies' interruptible loads.  Entergy Arkansas filed an application in November 2010 with the APSC for recovery of the refund that it paid.  The APSC denied Entergy Arkansas's application, and also denied Entergy Arkansas's petition for rehearing.  If the FERC were to order Entergy Arkansas to pay refunds on rehearing in the interruptible load proceeding the APSC's decision would trap FERC-approved costs at Entergy Arkansas with no regulatory-approved mechanism to recover them.  In August 2011, Entergy Arkansas filed a complaint in the United States District Court for the Eastern District of Arkansas asking for a declaratory judgment that the rejection of Entergy Arkansas's application by the APSC is preempted by the Federal Power Act.  The APSC filed a motion to dismiss the complaint.  In April 2012 the United States district court dismissed Entergy Arkansas's complaint without prejudice stating that Entergy Arkansas's claim is not ripe for adjudication at this time.

 

Entergy Arkansas Opportunity Sales Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding commenced at the FERC by the LPSC.

 

Storm Cost Recovery Filings with Retail Regulators

 

Entergy Gulf States Louisiana

 

Hurricane Katrina and Hurricane Rita

 

See the Form 10-K for a discussion of Entergy Gulf States Louisiana's Act 55 financing of its Hurricane Katrina and Hurricane Rita storm costs. In February 2012, Entergy Gulf States Louisiana sold 500,000 of its Class A preferred membership units in Entergy Holdings Company LLC, a wholly-owned Entergy subsidiary, to a third party in exchange for $51 million plus accrued but unpaid distributions on the units. The 500,000 preferred membership units are mandatorily redeemable in January 2112.

 

New Nuclear Generation Development Costs (Entergy Gulf States and Entergy Louisiana)

 

            Entergy Gulf States Louisiana and Entergy Louisiana are developing a project option for new nuclear generation at River Bend.  In March 2010, Entergy Gulf States Louisiana and Entergy Louisiana filed with the LPSC seeking approval to continue the limited development activities necessary to preserve an option to construct a new unit at River Bend.  The testimony and legal briefs of the LPSC staff generally support the request of Entergy Gulf States Louisiana and Entergy Louisiana, although other parties filed briefs, without supporting testimony, in opposition to the request.  At an evidentiary hearing in October 2011, Entergy Gulf States Louisiana, Entergy Louisiana, and the LPSC staff presented testimony in support of certification of activities to preserve an option for a new nuclear plant at River Bend.  The ALJ recommended, however, that the LPSC decline the request of Entergy Gulf States Louisiana and Entergy Louisiana on the basis that the LPSC's rule on new nuclear development does not apply to activities to preserve an option to develop and on the further grounds that the companies improperly engaged in advanced preparation activities prior to certification.  There has been no suggestion that the planning activities or costs incurred were imprudent.  Entergy Gulf States Louisiana and Entergy Louisiana have requested oral argument before the LPSC.

 

Texas Power Price Lawsuit

 

In August 2003, a lawsuit was filed in the district court of Chambers County, Texas by Texas residents on behalf of a purported class apparently of the Texas retail customers of Entergy Gulf States, Inc. who were billed and paid for electric power from January 1, 1994 to the present. The named defendants include Entergy Corporation, Entergy Services, Entergy Power, Entergy Power Marketing Corp., and Entergy Arkansas. Entergy Gulf States, Inc. was not a named defendant, but was alleged to be a co-conspirator. The court granted the request of Entergy Gulf States, Inc. to intervene in the lawsuit to protect its interests.

 

Plaintiffs allege that the defendants implemented a "price gouging accounting scheme" to sell to plaintiffs and similarly situated utility customers higher priced power generated by the defendants while rejecting and/or reselling to off-system utilities less expensive power offered and/or purchased from off-system suppliers and/or generated by the Entergy system. In particular, plaintiffs allege that the defendants manipulated and continue to manipulate the dispatch of generation so that power is purchased from affiliated expensive resources instead of buying cheaper off-system power.

 

Plaintiffs stated in their pleadings that customers in Texas were charged at least $57 million above prevailing market prices for power. Plaintiffs seek actual, consequential and exemplary damages, costs and attorneys' fees, and disgorgement of profits. The plaintiffs' experts have tendered a report calculating damages in a large range, from $153 million to $972 million in present value, under various scenarios. The Entergy defendants have tendered expert reports challenging the assumptions, methodologies, and conclusions of the plaintiffs' expert reports.

 

The case is pending in state district court, and in March 2012 the court found that the case met the requirements to be maintained as a class action under Texas law.  On April 30, 2012, the court entered an order certifying the class.

Entergy New Orleans [Member]
 
Rate And Regulatory Matters

NOTE 2. RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Regulatory Assets

 

            See Note 2 to the financial statements in the Form 10-K for information regarding regulatory assets in the Utility business presented on the balance sheets of Entergy and the Registrant Subsidiaries.  Following are updates to that information.

 

Correction of Regulatory Asset for Income Taxes

 

In the first quarter 2012, Entergy Gulf States Louisiana determined that its regulatory asset for income taxes was overstated because of a difference between the regulatory treatment of the income taxes associated with certain items (primarily pension expense) and the financial accounting treatment of those taxes. Beginning with Louisiana retail rate filings using the 1994 test year, retail rates were developed using the normalization method of accounting for income taxes. With respect to these items, however, the financial accounting for income taxes was computed using the flow-through method of accounting. As a result, over the years Entergy Gulf States Louisiana accumulated a regulatory asset representing the expected future recovery of tax expense for the affected items even though the tax expense was being collected currently in rates from customers and would not be recovered in the future.

 

The effect was immaterial to the consolidated balance sheets, results of operations, and cash flows of Entergy for all prior reporting periods and on a cumulative basis. Therefore, a cumulative adjustment was recorded in the first quarter 2012 to remove the regulatory asset previously recorded. This adjustment increased 2012 income tax expense by $46.3 million, decreased the regulatory asset for income taxes by $75.3 million, and decreased accumulated deferred income taxes by $29 million.

 

            The effect was also immaterial to the balance sheets, results of operations, and cash flows of Entergy Gulf States Louisiana for all prior reporting periods.  Correcting the cumulative effect of the error in the first quarter 2012 could have been material to the 2012 results of operations of Entergy Gulf States Louisiana and, therefore, Entergy Gulf States Louisiana is revising its prior period financial statements to correct the errors.  The corrections affect the prior period financial statements as shown in the tables below:


 

 

Three Months Ended

March 31, 2011

 

As

previously reported

 


As

corrected

 

(In Thousands)

 

 

 

 

Income Statement

 

 

 

Income taxes

$25,852 

 

$24,903 

Net income

$45,670 

 

$46,619 

Earnings applicable to common equity

$45,464 

 

$46,413 

 

 

 

 

Statement of Cash Flows

 

 

 

Net income

$45,670 

 

$46,619 

Deferred income taxes, investment tax credits,
  and non-current taxes accrued


($25,336)

 


($26,285)

Changes in other regulatory assets

($15,701)

 

($17,243)

Other operating activities

$48,274 

 

$49,816 

 

 

December 31, 2011

 

As

previously reported

 


As

corrected

 

(In Thousands)

 

 

 

 

Balance Sheet

 

 

 

Regulatory asset for income taxes - net

$249,058 

 

$173,724 

Accumulated deferred income taxes - current

$5,427 

 

$5,107 

Accumulated deferred income taxes and taxes accrued

$1,397,230 

 

$1,368,563 

Member's equity

$1,439,733 

 

$1,393,386 

 

 

Three Months Ended

March 31, 2011

 

Member's Equity

 

Total Equity

 

As

previously reported

 


As

corrected

 

As

previously reported

 

 

As

corrected

 

(In Thousands)

 

 

 

 

 

 

 

 

Statement of Changes in Equity

 

 

 

Balance at December 31, 2010

$1,539,517

 

$1,494,593

 

$1,509,213

 

$1,464,289

Net income

$45,670

 

$46,619

 

$45,670

 

$46,619

Balance at March 31, 2011

$1,506,576

 

$1,462,601

 

$1,477,015

 

$1,433,040

 

Fuel and Purchased Power Cost Recovery

 

Entergy Texas

 

            In December 2011, Entergy Texas filed with the PUCT a request to refund approximately $43 million, including interest, of fuel cost recovery over-collections through October 2011.  Entergy Texas and the parties to the proceeding reached an agreement that Entergy Texas will refund $67 million, including interest and additional over-recoveries through December 2011, over a three-month period.  Entergy Texas and the parties requested that interim rates consistent with the settlement be approved effective with the March 2012 billing month, and the PUCT approved the application in March 2012.

 

Retail Rate Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for detailed information regarding retail rate proceedings involving the Utility operating companies.  The following are updates to the Form 10-K.

 

Filings with the LPSC

 

Retail Rates - Gas (Entergy Gulf States Louisiana)

 

            In January 2012, Entergy Gulf States Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2011.  The filing showed an earned return on common equity of 10.48%, which is within the earnings bandwidth of 10.5%, plus or minus fifty basis points.  In April 2012, the LPSC Staff filed its findings, suggesting adjustments that will produce an 11.54% earned return on common equity for the test year and a $0.1 million rate reduction.  Entergy Gulf States Louisiana accepted the LPSC Staff's recommendations, and the rate reduction will be effective with the first billing cycle of May 2012.

 

Filings with the MPSC

 

            In March 2012, Entergy Mississippi submitted its formula rate plan 2011 test year filing.  The filing shows an earned return on common equity of 10.92% for the test year, which is within the earnings bandwidth and results in no change in rates.  The filing is currently subject to MPSC review.

 

Filings with the PUCT and Texas Cities

 

            See the Form 10-K for a discussion of the rate case that Entergy Texas filed in November 2011 requesting a $112 million base rate increase reflecting a 10.6% return on common equity based on an adjusted June 2011 test year. On April 3, 2012 the PUCT Staff filed direct testimony recommending a base rate increase of $66 million and a 9.6% return on common equity.  The PUCT Staff, however, subsequently filed a statement of position in the proceeding indicating that it was still evaluating the position it will ultimately take in the case regarding the Entergy Texas's recovery of purchased power capacity costs and Entergy Texas's proposal to defer its MISO transition expenses.  On April 13, 2012, Entergy Texas filed rebuttal testimony indicating a revised request for a $105 million base rate increase.  A hearing was held in late-April through early-May 2012 and a decision is pending.

 

System Agreement Cost Equalization Proceedings

 

            See the Form 10-K for a discussion of the proceedings regarding the System Agreement, including the FERC's October 2011 order, Entergy's December 2011 compliance filing in response to that order, and Entergy Arkansas's February 2012 filing for an interim adjustment to its production cost allocation rider requesting that the $156 million payment be collected from customers over the 22-month period from March 2012 through December 2013.  In March 2012 the APSC issued an order stating that the payment can be recovered from retail customers through the production cost allocation rider, subject to refund.  The LPSC and the APSC have requested rehearing of the FERC's October 2011 order.  The APSC, LPSC, the PUCT, and other parties intervened in the December 2011 compliance filing proceeding, and the APSC and the LPSC also filed protests.

 

            On May 7, 2012, the FERC issued orders in several System Agreement proceedings, including an order on rehearing in the 2007 rate filing based on 2006 production costs proceeding, an order on the ALJ's initial decision in the 2009 rate filing based on 2008 production costs proceeding, and orders in other proceedings regarding the method of calculating the production costs used in the determination of the rough production cost equalization payments and receipts.  The May 7, 2012 FERC orders may result in the reallocation of costs among the Utility operating companies, although there are still FERC decisions pending in other System Agreement proceedings that could affect the rough production cost equalization payments and receipts, including for the 2007 rate filing.  The FERC directed Entergy, within 45 days of the issuance of a pending FERC order on rehearing regarding the functionalization of costs in the 2007 rate filing, to file a comprehensive bandwidth recalculation report showing updated payments and receipts in the 2007 rate filing proceeding.  In the order in the 2007 rate filing proceeding, the FERC also denied Entergy's request for rehearing regarding the AmerenUE contract and ordered Entergy Arkansas to refund to AmerenUE the rough production cost equalization payments collected from AmerenUE.  Under the terms of the FERC's order the refund is due in June 2012.  Entergy Arkansas had previously recorded a regulatory provision for the potential refund to AmerenUE.

 

Interruptible Load Proceeding

 

            See the Form 10-K for a discussion of the proceeding regarding the treatment under the System Agreement of the Utility operating companies' interruptible loads.  Entergy Arkansas filed an application in November 2010 with the APSC for recovery of the refund that it paid.  The APSC denied Entergy Arkansas's application, and also denied Entergy Arkansas's petition for rehearing.  If the FERC were to order Entergy Arkansas to pay refunds on rehearing in the interruptible load proceeding the APSC's decision would trap FERC-approved costs at Entergy Arkansas with no regulatory-approved mechanism to recover them.  In August 2011, Entergy Arkansas filed a complaint in the United States District Court for the Eastern District of Arkansas asking for a declaratory judgment that the rejection of Entergy Arkansas's application by the APSC is preempted by the Federal Power Act.  The APSC filed a motion to dismiss the complaint.  In April 2012 the United States district court dismissed Entergy Arkansas's complaint without prejudice stating that Entergy Arkansas's claim is not ripe for adjudication at this time.

 

Entergy Arkansas Opportunity Sales Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding commenced at the FERC by the LPSC.

 

Storm Cost Recovery Filings with Retail Regulators

 

Entergy Gulf States Louisiana

 

Hurricane Katrina and Hurricane Rita

 

See the Form 10-K for a discussion of Entergy Gulf States Louisiana's Act 55 financing of its Hurricane Katrina and Hurricane Rita storm costs. In February 2012, Entergy Gulf States Louisiana sold 500,000 of its Class A preferred membership units in Entergy Holdings Company LLC, a wholly-owned Entergy subsidiary, to a third party in exchange for $51 million plus accrued but unpaid distributions on the units. The 500,000 preferred membership units are mandatorily redeemable in January 2112.

 

New Nuclear Generation Development Costs (Entergy Gulf States and Entergy Louisiana)

 

            Entergy Gulf States Louisiana and Entergy Louisiana are developing a project option for new nuclear generation at River Bend.  In March 2010, Entergy Gulf States Louisiana and Entergy Louisiana filed with the LPSC seeking approval to continue the limited development activities necessary to preserve an option to construct a new unit at River Bend.  The testimony and legal briefs of the LPSC staff generally support the request of Entergy Gulf States Louisiana and Entergy Louisiana, although other parties filed briefs, without supporting testimony, in opposition to the request.  At an evidentiary hearing in October 2011, Entergy Gulf States Louisiana, Entergy Louisiana, and the LPSC staff presented testimony in support of certification of activities to preserve an option for a new nuclear plant at River Bend.  The ALJ recommended, however, that the LPSC decline the request of Entergy Gulf States Louisiana and Entergy Louisiana on the basis that the LPSC's rule on new nuclear development does not apply to activities to preserve an option to develop and on the further grounds that the companies improperly engaged in advanced preparation activities prior to certification.  There has been no suggestion that the planning activities or costs incurred were imprudent.  Entergy Gulf States Louisiana and Entergy Louisiana have requested oral argument before the LPSC.

 

Texas Power Price Lawsuit

 

In August 2003, a lawsuit was filed in the district court of Chambers County, Texas by Texas residents on behalf of a purported class apparently of the Texas retail customers of Entergy Gulf States, Inc. who were billed and paid for electric power from January 1, 1994 to the present. The named defendants include Entergy Corporation, Entergy Services, Entergy Power, Entergy Power Marketing Corp., and Entergy Arkansas. Entergy Gulf States, Inc. was not a named defendant, but was alleged to be a co-conspirator. The court granted the request of Entergy Gulf States, Inc. to intervene in the lawsuit to protect its interests.

 

Plaintiffs allege that the defendants implemented a "price gouging accounting scheme" to sell to plaintiffs and similarly situated utility customers higher priced power generated by the defendants while rejecting and/or reselling to off-system utilities less expensive power offered and/or purchased from off-system suppliers and/or generated by the Entergy system. In particular, plaintiffs allege that the defendants manipulated and continue to manipulate the dispatch of generation so that power is purchased from affiliated expensive resources instead of buying cheaper off-system power.

 

Plaintiffs stated in their pleadings that customers in Texas were charged at least $57 million above prevailing market prices for power. Plaintiffs seek actual, consequential and exemplary damages, costs and attorneys' fees, and disgorgement of profits. The plaintiffs' experts have tendered a report calculating damages in a large range, from $153 million to $972 million in present value, under various scenarios. The Entergy defendants have tendered expert reports challenging the assumptions, methodologies, and conclusions of the plaintiffs' expert reports.

 

The case is pending in state district court, and in March 2012 the court found that the case met the requirements to be maintained as a class action under Texas law.  On April 30, 2012, the court entered an order certifying the class.

Entergy Texas [Member]
 
Rate And Regulatory Matters

NOTE 2. RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Regulatory Assets

 

            See Note 2 to the financial statements in the Form 10-K for information regarding regulatory assets in the Utility business presented on the balance sheets of Entergy and the Registrant Subsidiaries.  Following are updates to that information.

 

Correction of Regulatory Asset for Income Taxes

 

In the first quarter 2012, Entergy Gulf States Louisiana determined that its regulatory asset for income taxes was overstated because of a difference between the regulatory treatment of the income taxes associated with certain items (primarily pension expense) and the financial accounting treatment of those taxes. Beginning with Louisiana retail rate filings using the 1994 test year, retail rates were developed using the normalization method of accounting for income taxes. With respect to these items, however, the financial accounting for income taxes was computed using the flow-through method of accounting. As a result, over the years Entergy Gulf States Louisiana accumulated a regulatory asset representing the expected future recovery of tax expense for the affected items even though the tax expense was being collected currently in rates from customers and would not be recovered in the future.

 

The effect was immaterial to the consolidated balance sheets, results of operations, and cash flows of Entergy for all prior reporting periods and on a cumulative basis. Therefore, a cumulative adjustment was recorded in the first quarter 2012 to remove the regulatory asset previously recorded. This adjustment increased 2012 income tax expense by $46.3 million, decreased the regulatory asset for income taxes by $75.3 million, and decreased accumulated deferred income taxes by $29 million.

 

            The effect was also immaterial to the balance sheets, results of operations, and cash flows of Entergy Gulf States Louisiana for all prior reporting periods.  Correcting the cumulative effect of the error in the first quarter 2012 could have been material to the 2012 results of operations of Entergy Gulf States Louisiana and, therefore, Entergy Gulf States Louisiana is revising its prior period financial statements to correct the errors.  The corrections affect the prior period financial statements as shown in the tables below:


 

 

Three Months Ended

March 31, 2011

 

As

previously reported

 


As

corrected

 

(In Thousands)

 

 

 

 

Income Statement

 

 

 

Income taxes

$25,852 

 

$24,903 

Net income

$45,670 

 

$46,619 

Earnings applicable to common equity

$45,464 

 

$46,413 

 

 

 

 

Statement of Cash Flows

 

 

 

Net income

$45,670 

 

$46,619 

Deferred income taxes, investment tax credits,
  and non-current taxes accrued


($25,336)

 


($26,285)

Changes in other regulatory assets

($15,701)

 

($17,243)

Other operating activities

$48,274 

 

$49,816 

 

 

December 31, 2011

 

As

previously reported

 


As

corrected

 

(In Thousands)

 

 

 

 

Balance Sheet

 

 

 

Regulatory asset for income taxes - net

$249,058 

 

$173,724 

Accumulated deferred income taxes - current

$5,427 

 

$5,107 

Accumulated deferred income taxes and taxes accrued

$1,397,230 

 

$1,368,563 

Member's equity

$1,439,733 

 

$1,393,386 

 

 

Three Months Ended

March 31, 2011

 

Member's Equity

 

Total Equity

 

As

previously reported

 


As

corrected

 

As

previously reported

 

 

As

corrected

 

(In Thousands)

 

 

 

 

 

 

 

 

Statement of Changes in Equity

 

 

 

Balance at December 31, 2010

$1,539,517

 

$1,494,593

 

$1,509,213

 

$1,464,289

Net income

$45,670

 

$46,619

 

$45,670

 

$46,619

Balance at March 31, 2011

$1,506,576

 

$1,462,601

 

$1,477,015

 

$1,433,040

 

Fuel and Purchased Power Cost Recovery

 

Entergy Texas

 

            In December 2011, Entergy Texas filed with the PUCT a request to refund approximately $43 million, including interest, of fuel cost recovery over-collections through October 2011.  Entergy Texas and the parties to the proceeding reached an agreement that Entergy Texas will refund $67 million, including interest and additional over-recoveries through December 2011, over a three-month period.  Entergy Texas and the parties requested that interim rates consistent with the settlement be approved effective with the March 2012 billing month, and the PUCT approved the application in March 2012.

 

Retail Rate Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for detailed information regarding retail rate proceedings involving the Utility operating companies.  The following are updates to the Form 10-K.

 

Filings with the LPSC

 

Retail Rates - Gas (Entergy Gulf States Louisiana)

 

            In January 2012, Entergy Gulf States Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2011.  The filing showed an earned return on common equity of 10.48%, which is within the earnings bandwidth of 10.5%, plus or minus fifty basis points.  In April 2012, the LPSC Staff filed its findings, suggesting adjustments that will produce an 11.54% earned return on common equity for the test year and a $0.1 million rate reduction.  Entergy Gulf States Louisiana accepted the LPSC Staff's recommendations, and the rate reduction will be effective with the first billing cycle of May 2012.

 

Filings with the MPSC

 

            In March 2012, Entergy Mississippi submitted its formula rate plan 2011 test year filing.  The filing shows an earned return on common equity of 10.92% for the test year, which is within the earnings bandwidth and results in no change in rates.  The filing is currently subject to MPSC review.

 

Filings with the PUCT and Texas Cities

 

            See the Form 10-K for a discussion of the rate case that Entergy Texas filed in November 2011 requesting a $112 million base rate increase reflecting a 10.6% return on common equity based on an adjusted June 2011 test year. On April 3, 2012 the PUCT Staff filed direct testimony recommending a base rate increase of $66 million and a 9.6% return on common equity.  The PUCT Staff, however, subsequently filed a statement of position in the proceeding indicating that it was still evaluating the position it will ultimately take in the case regarding the Entergy Texas's recovery of purchased power capacity costs and Entergy Texas's proposal to defer its MISO transition expenses.  On April 13, 2012, Entergy Texas filed rebuttal testimony indicating a revised request for a $105 million base rate increase.  A hearing was held in late-April through early-May 2012 and a decision is pending.

 

System Agreement Cost Equalization Proceedings

 

            See the Form 10-K for a discussion of the proceedings regarding the System Agreement, including the FERC's October 2011 order, Entergy's December 2011 compliance filing in response to that order, and Entergy Arkansas's February 2012 filing for an interim adjustment to its production cost allocation rider requesting that the $156 million payment be collected from customers over the 22-month period from March 2012 through December 2013.  In March 2012 the APSC issued an order stating that the payment can be recovered from retail customers through the production cost allocation rider, subject to refund.  The LPSC and the APSC have requested rehearing of the FERC's October 2011 order.  The APSC, LPSC, the PUCT, and other parties intervened in the December 2011 compliance filing proceeding, and the APSC and the LPSC also filed protests.

 

            On May 7, 2012, the FERC issued orders in several System Agreement proceedings, including an order on rehearing in the 2007 rate filing based on 2006 production costs proceeding, an order on the ALJ's initial decision in the 2009 rate filing based on 2008 production costs proceeding, and orders in other proceedings regarding the method of calculating the production costs used in the determination of the rough production cost equalization payments and receipts.  The May 7, 2012 FERC orders may result in the reallocation of costs among the Utility operating companies, although there are still FERC decisions pending in other System Agreement proceedings that could affect the rough production cost equalization payments and receipts, including for the 2007 rate filing.  The FERC directed Entergy, within 45 days of the issuance of a pending FERC order on rehearing regarding the functionalization of costs in the 2007 rate filing, to file a comprehensive bandwidth recalculation report showing updated payments and receipts in the 2007 rate filing proceeding.  In the order in the 2007 rate filing proceeding, the FERC also denied Entergy's request for rehearing regarding the AmerenUE contract and ordered Entergy Arkansas to refund to AmerenUE the rough production cost equalization payments collected from AmerenUE.  Under the terms of the FERC's order the refund is due in June 2012.  Entergy Arkansas had previously recorded a regulatory provision for the potential refund to AmerenUE.

 

Interruptible Load Proceeding

 

            See the Form 10-K for a discussion of the proceeding regarding the treatment under the System Agreement of the Utility operating companies' interruptible loads.  Entergy Arkansas filed an application in November 2010 with the APSC for recovery of the refund that it paid.  The APSC denied Entergy Arkansas's application, and also denied Entergy Arkansas's petition for rehearing.  If the FERC were to order Entergy Arkansas to pay refunds on rehearing in the interruptible load proceeding the APSC's decision would trap FERC-approved costs at Entergy Arkansas with no regulatory-approved mechanism to recover them.  In August 2011, Entergy Arkansas filed a complaint in the United States District Court for the Eastern District of Arkansas asking for a declaratory judgment that the rejection of Entergy Arkansas's application by the APSC is preempted by the Federal Power Act.  The APSC filed a motion to dismiss the complaint.  In April 2012 the United States district court dismissed Entergy Arkansas's complaint without prejudice stating that Entergy Arkansas's claim is not ripe for adjudication at this time.

 

Entergy Arkansas Opportunity Sales Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding commenced at the FERC by the LPSC.

 

Storm Cost Recovery Filings with Retail Regulators

 

Entergy Gulf States Louisiana

 

Hurricane Katrina and Hurricane Rita

 

See the Form 10-K for a discussion of Entergy Gulf States Louisiana's Act 55 financing of its Hurricane Katrina and Hurricane Rita storm costs. In February 2012, Entergy Gulf States Louisiana sold 500,000 of its Class A preferred membership units in Entergy Holdings Company LLC, a wholly-owned Entergy subsidiary, to a third party in exchange for $51 million plus accrued but unpaid distributions on the units. The 500,000 preferred membership units are mandatorily redeemable in January 2112.

 

New Nuclear Generation Development Costs (Entergy Gulf States and Entergy Louisiana)

 

            Entergy Gulf States Louisiana and Entergy Louisiana are developing a project option for new nuclear generation at River Bend.  In March 2010, Entergy Gulf States Louisiana and Entergy Louisiana filed with the LPSC seeking approval to continue the limited development activities necessary to preserve an option to construct a new unit at River Bend.  The testimony and legal briefs of the LPSC staff generally support the request of Entergy Gulf States Louisiana and Entergy Louisiana, although other parties filed briefs, without supporting testimony, in opposition to the request.  At an evidentiary hearing in October 2011, Entergy Gulf States Louisiana, Entergy Louisiana, and the LPSC staff presented testimony in support of certification of activities to preserve an option for a new nuclear plant at River Bend.  The ALJ recommended, however, that the LPSC decline the request of Entergy Gulf States Louisiana and Entergy Louisiana on the basis that the LPSC's rule on new nuclear development does not apply to activities to preserve an option to develop and on the further grounds that the companies improperly engaged in advanced preparation activities prior to certification.  There has been no suggestion that the planning activities or costs incurred were imprudent.  Entergy Gulf States Louisiana and Entergy Louisiana have requested oral argument before the LPSC.

 

Texas Power Price Lawsuit

 

In August 2003, a lawsuit was filed in the district court of Chambers County, Texas by Texas residents on behalf of a purported class apparently of the Texas retail customers of Entergy Gulf States, Inc. who were billed and paid for electric power from January 1, 1994 to the present. The named defendants include Entergy Corporation, Entergy Services, Entergy Power, Entergy Power Marketing Corp., and Entergy Arkansas. Entergy Gulf States, Inc. was not a named defendant, but was alleged to be a co-conspirator. The court granted the request of Entergy Gulf States, Inc. to intervene in the lawsuit to protect its interests.

 

Plaintiffs allege that the defendants implemented a "price gouging accounting scheme" to sell to plaintiffs and similarly situated utility customers higher priced power generated by the defendants while rejecting and/or reselling to off-system utilities less expensive power offered and/or purchased from off-system suppliers and/or generated by the Entergy system. In particular, plaintiffs allege that the defendants manipulated and continue to manipulate the dispatch of generation so that power is purchased from affiliated expensive resources instead of buying cheaper off-system power.

 

Plaintiffs stated in their pleadings that customers in Texas were charged at least $57 million above prevailing market prices for power. Plaintiffs seek actual, consequential and exemplary damages, costs and attorneys' fees, and disgorgement of profits. The plaintiffs' experts have tendered a report calculating damages in a large range, from $153 million to $972 million in present value, under various scenarios. The Entergy defendants have tendered expert reports challenging the assumptions, methodologies, and conclusions of the plaintiffs' expert reports.

 

The case is pending in state district court, and in March 2012 the court found that the case met the requirements to be maintained as a class action under Texas law.  On April 30, 2012, the court entered an order certifying the class.

System Energy [Member]
 
Rate And Regulatory Matters

NOTE 2. RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Regulatory Assets

 

            See Note 2 to the financial statements in the Form 10-K for information regarding regulatory assets in the Utility business presented on the balance sheets of Entergy and the Registrant Subsidiaries.  Following are updates to that information.

 

Correction of Regulatory Asset for Income Taxes

 

In the first quarter 2012, Entergy Gulf States Louisiana determined that its regulatory asset for income taxes was overstated because of a difference between the regulatory treatment of the income taxes associated with certain items (primarily pension expense) and the financial accounting treatment of those taxes. Beginning with Louisiana retail rate filings using the 1994 test year, retail rates were developed using the normalization method of accounting for income taxes. With respect to these items, however, the financial accounting for income taxes was computed using the flow-through method of accounting. As a result, over the years Entergy Gulf States Louisiana accumulated a regulatory asset representing the expected future recovery of tax expense for the affected items even though the tax expense was being collected currently in rates from customers and would not be recovered in the future.

 

The effect was immaterial to the consolidated balance sheets, results of operations, and cash flows of Entergy for all prior reporting periods and on a cumulative basis. Therefore, a cumulative adjustment was recorded in the first quarter 2012 to remove the regulatory asset previously recorded. This adjustment increased 2012 income tax expense by $46.3 million, decreased the regulatory asset for income taxes by $75.3 million, and decreased accumulated deferred income taxes by $29 million.

 

            The effect was also immaterial to the balance sheets, results of operations, and cash flows of Entergy Gulf States Louisiana for all prior reporting periods.  Correcting the cumulative effect of the error in the first quarter 2012 could have been material to the 2012 results of operations of Entergy Gulf States Louisiana and, therefore, Entergy Gulf States Louisiana is revising its prior period financial statements to correct the errors.  The corrections affect the prior period financial statements as shown in the tables below:


 

 

Three Months Ended

March 31, 2011

 

As

previously reported

 


As

corrected

 

(In Thousands)

 

 

 

 

Income Statement

 

 

 

Income taxes

$25,852 

 

$24,903 

Net income

$45,670 

 

$46,619 

Earnings applicable to common equity

$45,464 

 

$46,413 

 

 

 

 

Statement of Cash Flows

 

 

 

Net income

$45,670 

 

$46,619 

Deferred income taxes, investment tax credits,
  and non-current taxes accrued


($25,336)

 


($26,285)

Changes in other regulatory assets

($15,701)

 

($17,243)

Other operating activities

$48,274 

 

$49,816 

 

 

December 31, 2011

 

As

previously reported

 


As

corrected

 

(In Thousands)

 

 

 

 

Balance Sheet

 

 

 

Regulatory asset for income taxes - net

$249,058 

 

$173,724 

Accumulated deferred income taxes - current

$5,427 

 

$5,107 

Accumulated deferred income taxes and taxes accrued

$1,397,230 

 

$1,368,563 

Member's equity

$1,439,733 

 

$1,393,386 

 

 

Three Months Ended

March 31, 2011

 

Member's Equity

 

Total Equity

 

As

previously reported

 


As

corrected

 

As

previously reported

 

 

As

corrected

 

(In Thousands)

 

 

 

 

 

 

 

 

Statement of Changes in Equity

 

 

 

Balance at December 31, 2010

$1,539,517

 

$1,494,593

 

$1,509,213

 

$1,464,289

Net income

$45,670

 

$46,619

 

$45,670

 

$46,619

Balance at March 31, 2011

$1,506,576

 

$1,462,601

 

$1,477,015

 

$1,433,040

 

Fuel and Purchased Power Cost Recovery

 

Entergy Texas

 

            In December 2011, Entergy Texas filed with the PUCT a request to refund approximately $43 million, including interest, of fuel cost recovery over-collections through October 2011.  Entergy Texas and the parties to the proceeding reached an agreement that Entergy Texas will refund $67 million, including interest and additional over-recoveries through December 2011, over a three-month period.  Entergy Texas and the parties requested that interim rates consistent with the settlement be approved effective with the March 2012 billing month, and the PUCT approved the application in March 2012.

 

Retail Rate Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for detailed information regarding retail rate proceedings involving the Utility operating companies.  The following are updates to the Form 10-K.

 

Filings with the LPSC

 

Retail Rates - Gas (Entergy Gulf States Louisiana)

 

            In January 2012, Entergy Gulf States Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2011.  The filing showed an earned return on common equity of 10.48%, which is within the earnings bandwidth of 10.5%, plus or minus fifty basis points.  In April 2012, the LPSC Staff filed its findings, suggesting adjustments that will produce an 11.54% earned return on common equity for the test year and a $0.1 million rate reduction.  Entergy Gulf States Louisiana accepted the LPSC Staff's recommendations, and the rate reduction will be effective with the first billing cycle of May 2012.

 

Filings with the MPSC

 

            In March 2012, Entergy Mississippi submitted its formula rate plan 2011 test year filing.  The filing shows an earned return on common equity of 10.92% for the test year, which is within the earnings bandwidth and results in no change in rates.  The filing is currently subject to MPSC review.

 

Filings with the PUCT and Texas Cities

 

            See the Form 10-K for a discussion of the rate case that Entergy Texas filed in November 2011 requesting a $112 million base rate increase reflecting a 10.6% return on common equity based on an adjusted June 2011 test year. On April 3, 2012 the PUCT Staff filed direct testimony recommending a base rate increase of $66 million and a 9.6% return on common equity.  The PUCT Staff, however, subsequently filed a statement of position in the proceeding indicating that it was still evaluating the position it will ultimately take in the case regarding the Entergy Texas's recovery of purchased power capacity costs and Entergy Texas's proposal to defer its MISO transition expenses.  On April 13, 2012, Entergy Texas filed rebuttal testimony indicating a revised request for a $105 million base rate increase.  A hearing was held in late-April through early-May 2012 and a decision is pending.

 

System Agreement Cost Equalization Proceedings

 

            See the Form 10-K for a discussion of the proceedings regarding the System Agreement, including the FERC's October 2011 order, Entergy's December 2011 compliance filing in response to that order, and Entergy Arkansas's February 2012 filing for an interim adjustment to its production cost allocation rider requesting that the $156 million payment be collected from customers over the 22-month period from March 2012 through December 2013.  In March 2012 the APSC issued an order stating that the payment can be recovered from retail customers through the production cost allocation rider, subject to refund.  The LPSC and the APSC have requested rehearing of the FERC's October 2011 order.  The APSC, LPSC, the PUCT, and other parties intervened in the December 2011 compliance filing proceeding, and the APSC and the LPSC also filed protests.

 

            On May 7, 2012, the FERC issued orders in several System Agreement proceedings, including an order on rehearing in the 2007 rate filing based on 2006 production costs proceeding, an order on the ALJ's initial decision in the 2009 rate filing based on 2008 production costs proceeding, and orders in other proceedings regarding the method of calculating the production costs used in the determination of the rough production cost equalization payments and receipts.  The May 7, 2012 FERC orders may result in the reallocation of costs among the Utility operating companies, although there are still FERC decisions pending in other System Agreement proceedings that could affect the rough production cost equalization payments and receipts, including for the 2007 rate filing.  The FERC directed Entergy, within 45 days of the issuance of a pending FERC order on rehearing regarding the functionalization of costs in the 2007 rate filing, to file a comprehensive bandwidth recalculation report showing updated payments and receipts in the 2007 rate filing proceeding.  In the order in the 2007 rate filing proceeding, the FERC also denied Entergy's request for rehearing regarding the AmerenUE contract and ordered Entergy Arkansas to refund to AmerenUE the rough production cost equalization payments collected from AmerenUE.  Under the terms of the FERC's order the refund is due in June 2012.  Entergy Arkansas had previously recorded a regulatory provision for the potential refund to AmerenUE.

 

Interruptible Load Proceeding

 

            See the Form 10-K for a discussion of the proceeding regarding the treatment under the System Agreement of the Utility operating companies' interruptible loads.  Entergy Arkansas filed an application in November 2010 with the APSC for recovery of the refund that it paid.  The APSC denied Entergy Arkansas's application, and also denied Entergy Arkansas's petition for rehearing.  If the FERC were to order Entergy Arkansas to pay refunds on rehearing in the interruptible load proceeding the APSC's decision would trap FERC-approved costs at Entergy Arkansas with no regulatory-approved mechanism to recover them.  In August 2011, Entergy Arkansas filed a complaint in the United States District Court for the Eastern District of Arkansas asking for a declaratory judgment that the rejection of Entergy Arkansas's application by the APSC is preempted by the Federal Power Act.  The APSC filed a motion to dismiss the complaint.  In April 2012 the United States district court dismissed Entergy Arkansas's complaint without prejudice stating that Entergy Arkansas's claim is not ripe for adjudication at this time.

 

Entergy Arkansas Opportunity Sales Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding commenced at the FERC by the LPSC.

 

Storm Cost Recovery Filings with Retail Regulators

 

Entergy Gulf States Louisiana

 

Hurricane Katrina and Hurricane Rita

 

See the Form 10-K for a discussion of Entergy Gulf States Louisiana's Act 55 financing of its Hurricane Katrina and Hurricane Rita storm costs. In February 2012, Entergy Gulf States Louisiana sold 500,000 of its Class A preferred membership units in Entergy Holdings Company LLC, a wholly-owned Entergy subsidiary, to a third party in exchange for $51 million plus accrued but unpaid distributions on the units. The 500,000 preferred membership units are mandatorily redeemable in January 2112.

 

New Nuclear Generation Development Costs (Entergy Gulf States and Entergy Louisiana)

 

            Entergy Gulf States Louisiana and Entergy Louisiana are developing a project option for new nuclear generation at River Bend.  In March 2010, Entergy Gulf States Louisiana and Entergy Louisiana filed with the LPSC seeking approval to continue the limited development activities necessary to preserve an option to construct a new unit at River Bend.  The testimony and legal briefs of the LPSC staff generally support the request of Entergy Gulf States Louisiana and Entergy Louisiana, although other parties filed briefs, without supporting testimony, in opposition to the request.  At an evidentiary hearing in October 2011, Entergy Gulf States Louisiana, Entergy Louisiana, and the LPSC staff presented testimony in support of certification of activities to preserve an option for a new nuclear plant at River Bend.  The ALJ recommended, however, that the LPSC decline the request of Entergy Gulf States Louisiana and Entergy Louisiana on the basis that the LPSC's rule on new nuclear development does not apply to activities to preserve an option to develop and on the further grounds that the companies improperly engaged in advanced preparation activities prior to certification.  There has been no suggestion that the planning activities or costs incurred were imprudent.  Entergy Gulf States Louisiana and Entergy Louisiana have requested oral argument before the LPSC.

 

Texas Power Price Lawsuit

 

In August 2003, a lawsuit was filed in the district court of Chambers County, Texas by Texas residents on behalf of a purported class apparently of the Texas retail customers of Entergy Gulf States, Inc. who were billed and paid for electric power from January 1, 1994 to the present. The named defendants include Entergy Corporation, Entergy Services, Entergy Power, Entergy Power Marketing Corp., and Entergy Arkansas. Entergy Gulf States, Inc. was not a named defendant, but was alleged to be a co-conspirator. The court granted the request of Entergy Gulf States, Inc. to intervene in the lawsuit to protect its interests.

 

Plaintiffs allege that the defendants implemented a "price gouging accounting scheme" to sell to plaintiffs and similarly situated utility customers higher priced power generated by the defendants while rejecting and/or reselling to off-system utilities less expensive power offered and/or purchased from off-system suppliers and/or generated by the Entergy system. In particular, plaintiffs allege that the defendants manipulated and continue to manipulate the dispatch of generation so that power is purchased from affiliated expensive resources instead of buying cheaper off-system power.

 

Plaintiffs stated in their pleadings that customers in Texas were charged at least $57 million above prevailing market prices for power. Plaintiffs seek actual, consequential and exemplary damages, costs and attorneys' fees, and disgorgement of profits. The plaintiffs' experts have tendered a report calculating damages in a large range, from $153 million to $972 million in present value, under various scenarios. The Entergy defendants have tendered expert reports challenging the assumptions, methodologies, and conclusions of the plaintiffs' expert reports.

 

The case is pending in state district court, and in March 2012 the court found that the case met the requirements to be maintained as a class action under Texas law.  On April 30, 2012, the court entered an order certifying the class.