Technical Report

 

for the

 

Maricunga Gold Mine

 

(Located in the Maricunga District of Region III, Chile)

 

 

Prepared for Compañia Minera Maricunga

 

and

 

Kinross Gold Corporation

 

Prepared by:

 

M. Bélanger, P. Geo.

 

Director of Technical Services

 

Kinross Gold Corporation

 

Effective Date: December 31, 2007

 



 

 

Kinross Gold Corporation

 

 

 

 

 

Maricunga Mine Technical Report

 

ACKNOWLEDGEMENTS

 

The author would like to thank the following individuals for their contributions to and their assistance in the preparation of this report.

 

Juan Carlos Buguena

 

Planning Superintendent, CMM

 

 

 

Rene Albornoz

 

Geology Superintendent, CMM

 

 

 

Jorge Rojas

 

Reserves Technician, CMM

 

 

 

Barry Gillies

 

Director of Exploration, Kinross

 

 

 

Mark Sedore

 

Director, Corporate Reserves, Kinross

 

 

 

Kevin Morris

 

Director Mine Engineering Services, Kinross

 

 

 

Jeremy Niemi

 

Senior Geologist, Kinross

 

 

 

Rob Henderson

 

Vice President Technical Services, Kinross

 

 

 

Kevan Ford

 

Manager, Metallurgy, Kinross

 

 

 

Sergio Neira Martinez

 

Exploration Geologist, CMM

 

 

 

Ivo Ahumada Cortes

 

Exploration Geologist, CMM

 

2



 

Certificate of Author

 

I, Maryse Bélanger, P. Geo., do hereby certify that:

 

·                              I am Director of Technical Services, Kinross Americas for Kinross Gold Corporation, Av. Afonso Pena, 4001-0 andar Ala - Ed. Presidente Tancredo Neves - Bairro Serra - Belo Horizonte, MG, Brazil, CEP-30130.

 

·                              I graduated with a Bachelor of Science degree (BSc) in Earth Sciences from the Université du Québec à Chicoutimi in 1985. I studied Geostatistics at the Centre de Géostatistique in Fontainebleau, France in 1986.

 

·                              I am a member of the Association of Professional Geoscientists of Ontario (Registration Number # 0125).

 

·                              I have worked as a geologist for a total of 23 years since my graduation from University.  I have been involved in gold exploration and mining in Canada, United States of America, Russia, Niger, Burkina Faso, Ivory Coast, Ethiopia, Gabon and Chile.

 

·                              I have read the definition of “qualified person” set out in National Instrument 43-101 (“NI 43-101”) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfil the requirements to be a “qualified person” for the purposes of NI 43 -101.

 

·                              I have read NI 43-101 and certify that the Technical Report has been prepared in compliance with NI-43-101 and Form 43-101F1.

 

·                              I am responsible for supervising the writing of the technical report titled “Technical Report on the Maricunga Gold Mine” dated December 31, 2007.

 

·                              I visited the property every quarter in 2004 and 2005 and spent more than 75 days at site during the course of active exploration in 2006. In 2007 I visited the mine on a regular basis.

 

·                              I have not had prior involvement with the property that is the subject of the technical report.

 

·                              I am not aware of any material fact or material change with respect to the subject matter of the Technical Report that is not reflected in the Technical Report, the omission to disclose which makes the Technical Report misleading.

 

·                              As of the date of this certificate, to the best of my knowledge and belief, the Technical Report contains all the scientific and technical information that is required to omission to make the Technical Report not misleading.

 

·                              As of the date of this certificate, to the best of my knowledge and belief, the Technical Report contains all the scientific and technical information that is required to omission to make the technical report not misleading.

 

·                              I am not independent of the issuer.  Per section 5.3.2 of National Instrument 43-101 an independent qualified person was not required to write the technical report on the Maricunga Mine.

 

Dated this 31st day of March, 2008 at Brasilia, Brazil.

 

 

“Signed and Sealed”

 

 

Maryse Bélanger, P. Geo.

 

3



 

TABLE OF CONTENTS

 

1.0

SUMMARY

1-11

 

 

 

2.0

INTRODUCTION AND TERMS OF REFERENCE

2-17

 

 

 

2.1

 INTRODUCTION

2-17

 

 

 

2.2

 TERMS OF REFERENCE

2-17

 

 

 

2.3

 SCOPE OF WORK

2-17

 

 

 

2.4

 SOURCES OF INFORMATION AND REPORT BASIS

2-18

 

 

 

2.5

 FIELD INVOLVEMENT OF THE QUALIFIED PERSON

2-18

 

 

 

3.0

RELIANCE ON OTHER EXPERTS

3-19

 

 

 

4.0

PROPERTY DESCRIPTION AND LOCATION

4-20

 

 

 

4.1

CLAIM STATUS

4-20

 

 

 

4.1.1

Surface Rights

4-21

 

 

 

4.1.2

Water Rights

4-21

 

 

 

4.1.3

Royalty Payments

4-21

 

 

 

4.1.4

Environmental Liabilities

4-21

 

 

 

5.0

ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY

5-27

 

 

 

5.1

 ACCESSIBILITY

5-27

 

 

 

5.2

 CLIMATE AND PHYSIOGRAPHY

5-27

 

 

 

5.3

 LOCAL RESOURCES AND INFRASTRUCTURE

5-27

 

 

 

6.0

HISTORY

6-29

 

 

 

7.0

GEOLOGICAL SETTING

7-32

 

 

 

7.1

 ALTERATION

7-32

 

 

 

7.1.1

Verde

7-32

 

 

 

7.1.2

Pancho

7-33

 

 

 

7.2

 STRUCTURE

7-34

 

 

 

8.0

 DEPOSIT TYPES

8-35

 

 

 

8.1

 VERDE

8-35

 

 

 

8.2

 PANCHO

8-36

 

4



 

9.0

MINERALIZATION

9-38

 

 

 

9.1

  VERDE

9-38

 

 

 

9.2

  PANCHO

9-38

 

 

 

10.0

EXPLORATION

10-40

 

 

 

11.0

DRILLING

11-42

 

 

 

11.1

  RIG SETUP AND SURVEY

11-43

 

 

 

11.2

  TOPOGRAPHIC BASE AND SURVEY AUDIT

11-43

 

 

 

11.3

  CORE HANDLING, STORAGE AND SECURITY

11-43

 

 

 

12.0

SAMPLE METHOD AND APPROACH

12-45

 

 

 

12.1

  RC DRILLING

12-45

 

 

 

12.2

  CORE DRILLING

12-46

 

 

 

12.3

  LOGGING

12-46

 

 

 

12.4

  GEOTECHNICAL CORE LOGGING

12-47

 

 

 

12.5

  COMPOSITE SAMPLE SUMMARY

12-47

 

 

 

13.0

SAMPLE PREPARATION, ANALYSES AND SECURITY

13-48

 

 

 

13.1

  SAMPLE PREPARATION

13-48

 

 

 

13.2

  SAMPLE PREPARATION 2006

13-49

 

 

 

13.3

  ANALYSIS

13-49

 

 

 

13.4

QUALITY CONTROL / QUALITY ASSURANCE

13-50

 

 

 

13.4.1

Drilling 2002-2003

13-50

 

 

 

13.4.2

Drilling 2006

13-51

 

 

 

13.4.3

Table of Failures

13-51

 

 

 

13.4.4

Analysis of QA/QC Data

13-52

 

 

 

13.4.5

Referee Laboratory

13-52

 

 

 

13.4.6

Statement of Author’s Opinion

13-52

 

 

 

14.0

DATA VERIFICATION

14-53

 

 

 

14.1

  GENERAL 2002-2003

14-53

 

 

 

14.2

  PRE-2002 DATA VERIFICATION

14-54

 

 

 

14.2.1

Collar Data

14-54

 

 

 

14.2.2

Survey Data

14-54

 

 

 

14.2.3

Lithology, Alteration, Oxidation, Vein and Mineralization Data:

14-54

 

5



 

14.2.4

Analytical Data

14-54

 

 

 

14.3

  2002-2003 DATA VERIFICATION

14-54

 

 

 

14.3.1

Collar Data

14-54

 

 

 

14.3.2

Survey Data

14-55

 

 

 

14.3.3

Lithology, Alteration, Oxidation, Vein and Mineralization Data

14-55

 

 

 

14.3.4

Analytical Data

14-55

 

 

 

14.3.5

Geotechnical Data

14-55

 

 

 

14.4

  DATA ENTRY, STORAGE, MANAGEMENT AND SECURITY

14-56

 

 

 

14.4.1

Data Entry

14-56

 

 

 

14.4.2

Data Storage

14-57

 

 

 

14.4.3

Data Management and Security

14-57

 

 

 

15.0

  ADJACENT PROPERTIES

15-58

 

 

 

16.0

MINERAL PROCESSING AND METALLURGICAL TESTING

16-59

 

 

 

16.1

  METALLURGICAL TEST WORK 2003

16-60

 

 

 

16.1.1

Cyanide Soluble Assays

16-60

 

 

 

16.1.2

Direct Agitated Cyanidation (Bottle Roll) Tests

16-60

 

 

 

16.1.3

Column Leach Tests

16-62

 

 

 

16.1.4

Bond Work Index

16-64

 

 

 

16.1.5

Specific Gravity

16-65

 

 

 

16.1.6

Acid Rock Drainage Study

16-65

 

 

 

16.2

  METALLURGICAL TEST WORK 2006

16-66

 

 

 

16.2.1

Introduction

16-66

 

 

 

16.2.2

Comments on Historical Metallurgical Composite Selection Criteria

16-66

 

 

 

16.2.3

Metallurgical Composite Selection Criteria (2006)

16-67

 

 

 

16.2.4

McClelland Test Work Summary

16-68

 

 

 

16.2.5

SART Process Feasibility Study

16-73

 

 

 

17.0

MINERAL RESOURCE AND MINERAL RESERVE ESTIMATE

17-78

 

 

 

17.1

  INTRODUCTION

17-78

 

 

 

17.2

  INTERPRETATION AND GRADE DOMAINS

17-78

 

 

 

17.2.1

Verde

17-78

 

 

 

17.2.2

Pancho

17-80

 

 

 

17.3

OXIDATION MODEL AND RECOVERY

17-81

 

 

 

17.4

GRADE MODEL

17-81

 

6



 

17.4.1

Statistical and Geostatistical Analyses

17-81

 

 

 

17.4.2

Grade capping

17-83

 

 

 

17.4.3

Sample Compositing

17-83

 

 

 

17.4.4

Contact Profiles

17-84

 

 

 

17.4.5

Variography

17-84

 

 

 

17.4.6

Model Framework

17-85

 

 

 

17.4.7

Gold Grade Interpolation Verde

17-85

 

 

 

17.4.8

Gold Grade Interpolation Pancho

17-86

 

 

 

17.4.9

Densities

17-87

 

 

 

17.4.10

Model Checking and Verification

17-88

 

 

 

17.5

  RESOURCE CLASSIFICATION

17-88

 

 

 

17.5.1

Resource Classification Verde

17-89

 

 

 

17.5.2

Resource Classification Pancho

17-89

 

 

 

17.6

  MINERAL RESOURCE ESTIMATE

17-89

 

 

 

17.7

  CONSIDERATIONS FOR RESERVES

17-90

 

 

 

17.8

  MINERAL RESERVE ESTIMATE

17-90

 

 

 

17.9

  PIT OPTIMIZATIONS

17-91

 

 

 

17.9.1

Verde

17-91

 

 

 

17.9.2

Pancho

17-91

 

 

 

17.10

  PIT DESIGNS

17-93

 

 

 

17.10.1

Verde

17-93

 

 

 

17.10.2

Pancho

17-95

 

 

 

18.0

OTHER RELEVANT DATA AND INFORMATION

18-97

 

 

 

19.0

INTERPRETATION AND CONCLUSIONS

19-98

 

 

 

20.0

RECOMMENDATIONS

20-99

 

 

 

21.0

REFERENCES

21-100

 

 

 

22.0

DATE AND SIGNATURE PAGE

22-104

 

 

 

23.0

ADDITIONAL REQUIREMENTS FOR OPERATING PROPERTIES

23-105

 

 

 

23.1

  MINING OPERATIONS

23-105

 

 

 

23.1.1

Mobile Equipment

23-106

 

 

 

23.1.2

Leach Pad and Plant Infrastructure

23-106

 

7



 

23.2

  RECOVERABILITY

23-107

 

 

 

23.3

  MARKETS

23-107

 

 

 

23.4

  CONTRACTS

23-107

 

 

 

23.5

  ENVIRONMENTAL CONSIDERATIONS

23-107

 

 

 

23.6

  CAPITAL COSTS

23-108

 

 

 

23.7

  OPERATING COSTS

23-109

 

 

 

23.8

  ECONOMIC ANALYSES

23-110

 

 

 

23.9

  PAYBACK

23-110

 

 

 

23.10

  MINE LIFE

23-110

 

LIST OF TABLES

 

Table 1-1: Maricunga Proven and Probable Mineral Reserves

1-15

 

 

Table 1-2: Maricunga Measured and Indicated Mineral Resources

1-15

 

 

Table 4-1: Mineral Rights and Claims

4-24

 

 

Table 6-1: Annual Gold Production of the Maricunga Mine

6-30

 

 

Table 11-1: Exploration Drill Summary

11-42

 

 

Table 16-1: Summary of Bottle Roll Sample Selection

16-61

 

 

Table 16-2: Summary of Bottle Roll Results

16-61

 

 

Table 16-3: Summary of Column Leach Sample Selection

16-62

 

 

Table 16-4: Summary of Column Leach Test Results

16-63

 

 

Table 16-5: Specific Gravity Results

16-65

 

 

Table 16-6: Pancho Metallurgical Composites 2006

16-68

 

 

Table 16-7: Pancho and Verde Gold Recovery Estimates

16-71

 

 

Table 16-8: Pancho Bottle Roll Summary 2006

16-72

 

 

Table 16-9: Pancho Column Test Summary 2007 (Part 1)

16-72

 

 

Table 16-10: Pancho Column Test Summary 2007 (Part 2)

16-73

 

 

Table 17-1: Oxidation Codes

17-81

 

 

Table 17-2: Statistics for Uncapped 2 m Gold Assays - Verde

17-82

 

8



 

Table 17-3: Statistics for Uncapped 2 m Gold Assays - Pancho

17-82

 

 

Table 17-4: Statistics for 5 m Gold Composites - Verde

17-83

 

 

Table 17-5: Statistics for 5 m Gold Composites – Pancho

17-84

 

 

Table 17-6: Statistics for 5 m Copper Composites – Pancho

17-84

 

 

Table 17-7: Statistics for 5 m Cyanide Soluble Copper Composites – Pancho

17-84

 

 

Table 17-8: Verde Variogram Table

17-85

 

 

Table 17-9: Pancho Variogram Table

17-85

 

 

Table 17-10: Density Measurements and Oxidation Level for Verde

17-88

 

 

Table 17-11: Density Measurements and Oxidation Level for Pancho

17-88

 

 

Table 17-12: Measured and Indicated Mineral Resources

17-90

 

 

Table 17-13: Proven and Probable Mineral Reserves

17-91

 

 

Table 17-14: Optimization Parameters for Verde

17-92

 

 

Table 17-15: Optimization Parameters for Pancho

17-93

 

 

Table 23-1: Capital Costs – Maricunga

23-108

 

 

Table 23-2: 2007 Actual Operating Costs – Maricunga

23-109

 

 

Table 23-3: 2007 Life of Mine Plan

23-110

 

LIST OF FIGURES

 

Figure 4-1: Maricunga Location Map

4-20

 

 

Figure 4-2: Land Claims and Infrastructure Location

4-22

 

 

Figure 4-3: Details of Mineral Rights and Claims

4-23

 

 

Figure 7-1: Geology of the Maricunga Mine Area

7-34

 

 

Figure 8-1: Simplified Geology for Pancho

8-37

 

 

Figure 11-1: Verde Drilling Coverage as December 31, 2007

11-44

 

 

Figure 11-2: Pancho Drill Coverage as at December 31, 2007

11-44

 

 

Figure 16-1: Metallurgical Sample Locations – Verde Pit – 4300 Level

16-63

 

 

Figure 16-2: Metallurgical Sample Locations – Pancho Pit – 4300 Level

16-64

 

 

Figure 16-3: SART Plant Flowsheet

16-74

 

9



 

Figure 16-4: Modified Maricunga Plant Flowsheet with SART

16-77

 

 

Figure 17-1: Typical Plan View of Verde Domaining (Bench 4280)

17-79

 

 

Figure 17-2: Interramp angles for Verde Pit Design

17-94

 

 

Figure 17-3: Verde Pit Design Phase 4 with Topography

17-95

 

 

Figure 17-4: Pancho Pit Design with Topography

17-96

 

10



 

1.0          SUMMARY

 

This Technical Report for the Maricunga Mine has been prepared to support the 2007 Kinross Gold Corporation (Kinross) Annual Mineral Resources and Reserves Statement and has been prepared under the direct supervision of the qualified person, Maryse Bélanger, P. Geo., Director Technical Services, Kinross Americas with contributions from CMM technical staff.

 

The Maricunga Gold Mine is located in the Maricunga Gold Belt in Region III of northern Chile. The property is located 120 km due east of the city of Copiapó at elevations between 4,200 and 4,500 meters above mean sea level.  The mine operated from 1996 to 2001, producing more than 920,000 ounces of gold from 46.0 million tonnes of ore. The mine was placed on care and maintenance in 2001, due to a downturn in gold prices. The Maricunga Mine complex comprises two open-pits, Verde East and Verde West and a near-development project called Pancho.

 

The Maricunga heap leach mine is owned and operated by Compañía Minera Maricunga (CMM), a Chilean company that is wholly-owned by Kinross since its acquisition of Bema Gold Corporation effective at the end of February 2007.

 

The Verde and Pancho gold deposits at Maricunga occur in the Maricunga Gold Belt of the high Andes in northern Chile.  Since 1980, a total of 40 million ounces of gold have been defined in the belt, (Muntean and Einaudi, 2000).  Gold mineralization at Maricunga has been interpreted as porphyry style gold systems and is hosted in the Maricunga volcanic-intrusive complex of Early Miocene age. The porphyries occur within a sequence of intermediate tuffs, porphyries and breccias that are the host rocks to the gold mineralization.

 

Gold mineralization at Verde is interpreted to be the result of the fracturing and concentration of fluids in the carapace of an intrusive plug or stock. Gold is closely associated with quartz, magnetite, calcite, and garnet stockworks. Gold mineralization at Pancho is characterized as porphyry hosted stockwork and sheeted veins. The veins are subvertical and have a strong, preferred north-westerly strike. The northwest structural control is evident not only at outcrop scale but is also reflected in the northwest alignment of intrusives and the three centers of mineralization in the district, Verde, Pancho and Guanaco.

 

11



 

In September 2002, in response to rising gold prices, Compañia Minera Maricunga (CMM) approved an Exploration Program designed to increase the reserve base of the Maricunga Project to a level sufficient to support resumption of active mining. The drilling completed in 2002-2003 focused largely on definition drilling for a $350 gold pit design.

 

The exploration program ran from September 2002 to June 2003.  During this period, a total of 262 drill holes (51,478 meters) of drilling were completed. The drilling focused on increasing the confidence level of the known mineralization below the current Verde pits as well as increasing the confidence level in the mineralization at the nearby Pancho deposit, located approximately 2.0 km to the northeast.  Much of the 2002 – 2003 drilling was diamond drill core, allowing geologists an opportunity to clearly delineate geological and alteration features affecting gold mineralization and recovery.

 

The information was compiled and incorporated in new mineral resource and mineral reserve estimates for Verde and Pancho. The reserves formed the basis of a detailed engineering study examining the economics of the project assuming a capital investment of $101.1 million to upgrade the existing infrastructure, allowing the plant to process 40,000 tonnes per day of Verde ore and 35,000 tonnes per day of Pancho ore. The capital investment was based on preliminary design and first-principle engineering.

 

The Maricunga Mine resumed full production in October 2005 at a mining rate of 40,000 tpd. Total production of 233,000 ounces from 14,333,000 tonnes at 0.74 g/t Au is reported for 2007. Only data below the year-end 2007 topographic surface was used to complete the new resource model and reserve estimate.

 

Both the 2002-2003 and 2006 drill programs were carefully supervised, employing industry best practices and rigid quality management procedures in the collection and management of the field data. In addition, all historic data for the project was subjected to detailed verification programs where the data in the relational database was verified against original logs, survey calculation sheets and original assay certificates.  The result is a duly verified database containing data of high quality and free of gross errors and omissions. This database was then used to estimate mineral resource and reserves for the project.

 

In early 2006, CMM made the decision to drill at Pancho to better define the mineral resource both laterally and at depth.  During the course of 2007, a full review of the geologic

 

12



 

interpretation and the spatial controls of mineralization was undertaken for both Verde and Pancho resulting in new resource models to support updated Mineral Resource and Mineral Reserve estimates.

 

In addition to the analytical data, the 2002-2003 drill program was also used to collect carefully controlled metallurgical samples from Verde and Pancho. A total of 58 direct agitation (bottle roll) and 18 column leach test samples were collected and analyzed. The metallurgical samples were carefully selected to ensure adequate sample coverage of various grade bins, recovery classes and lithologies. More metallurgical test work was completed in 2006 and 2007 with the addition of 19 column tests for Pancho. The data compiled to date indicates that gold recovery from the Pancho samples tested is approximately 68% for the sulphide ore and 85% for the oxide ore.  This recent test work plus the work completed in 2003 confirms that the gold recovery values used in the 2007 reserve estimate are reasonable.

 

In 2007, the SART process was tested for the Pancho ore given the higher concentrations of copper present in the ore. Some of the copper minerals are soluble in cyanide solutions and these minerals consume cyanide reagent and contaminate the leach solution with copper metal.  A feasibility study and pilot testing program were completed by Idesol and SGS Lakefield of Santiago. The study considers plant design, performance metrics, operating and capital costs and implementation strategy. The reserves defined at Pancho consider the application of SART.

 

Ore and waste hardness was also tested in 2002-2003. Specific gravity of the various rock types was confirmed through extensive field sampling. In 2006, specific gravity measurements were also performed on more than 1,500 core samples from Pancho.

 

The resource block models were first updated in 2003 to reflect the lithological models developed from observations taken from drill core. At the same time, a new recovery model was developed based on the visual logging of oxidation. The visual estimates were completed using a well-established scale previously used on the project. In 2006, with the additional core samples, the surfaces defining oxidation levels were updated (oxide, mixed and sulphide).

 

13



 

Statistical and geostatistical analysis of the drill results was performed on the raw, 2.0 meter sample intervals to identify appropriate grade capping factors. Grade capping does not have a significant effect on the resource estimates, resulting in a less than 1% decrease in contained gold. The 2007 work also included compositing of the data using 5 m length. Contact profiles were prepared to determine the search strategies for copper and gold grade interpolation.  Directional variograms were modeled to identify anisotropy and search ranges that would guide grade interpolation. The variograms demonstrated excellent continuity, generally exceeding 100 meters in all directions.

 

Grade interpolation was limited to gold for the Verde deposit while gold; copper and cyanide soluble copper were modeled for Pancho. Ordinary kriging was selected as the primary interpolation method for gold. Both inverse distance and nearest neighbour grade interpolations were also performed to verify the kriged gold grades.

 

The resultant resource block models were manually verified to ensure that grade interpolation was reasonable. The model was classified as per CIM Guidelines as Measured, Indicated and Inferred based primarily on the search ranges indicated by the variograms and experience gained at Verde.

 

The block models were used as the basis for pit optimization that was completed with the Whittle algorithm. Optimization work was based on operating costs, adjustment factors and parameters updated in November 2007.  The optimum pit shells were imported into Vulcan for final pit design using design parameters approved by a third party geotechnical engineering company.

 

The final mine designs were used to estimate the mineral resources and reserves was and were prepared by a Qualified Person as required by National Instrument 43-101.

 

Mineral reserves listed below in Table 1-1 are based on a $550 gold price and constitute the official reserves as of 31, December 2007.

 

It is Kinross Policy that for all open pit mine projects, the mineral resource must fall within optimized or final design pits that are based on reasonable, long-term, gold price assumptions.

 

14



 

In Table 1-2, mineral resources are based on a $625 gold price and reported exclusive of mineral reserves as of 31, December 2007.

 

Table 1-1: Maricunga Proven and Probable Mineral Reserves

 

 

 

 

 

Ore Tonnes

 

Grade

 

Gold Ounces

 

Deposit

 

Class

 

(x 1,000)

 

(Au g/t)

 

(x 1,000)

 

Verde

 

Proven

 

71,071

 

0.85

 

1,947

 

 

 

Probable

 

32,409

 

0.74

 

772

 

 

 

2P

 

103,480

 

0.82

 

2,719

 

Pancho

 

Proven

 

106,627

 

0.71

 

2,436

 

 

 

Probable

 

69,395

 

0.58

 

1,290

 

 

 

2P

 

176,022

 

0.66

 

3,726

 

Total

 

 

 

279,502

 

0.72

 

6,445

 

 

Table 1-2: Maricunga Measured and Indicated Mineral Resources

 

 

 

 

 

Ore Tonnes

 

Grade

 

Gold Ounces

 

Deposit

 

Class

 

(x 1,000)

 

(Au g/t)

 

(x 1,000)

 

Verde

 

Measured

 

19,335

 

0.73

 

456

 

 

 

Indicated

 

26,987

 

0.71

 

619

 

 

 

M&I

 

46,322

 

0.72

 

1,075

 

Pancho

 

Measured

 

7,585

 

0.52

 

128

 

 

 

Indicated

 

57,549

 

0.58

 

1,071

 

 

 

M&I

 

65,134

 

0.57

 

1,198

 

Total

 

 

 

111,456

 

0.63

 

2,274

 

 

The Maricunga deposits also host an Inferred Mineral Resource of 134.71 million tonnes averaging 0.56 g/tonne Au, given the same $625 US per ounce gold price.  Pancho hosts 132.90 million tonnes averaging 0.56 g/tonne Au and Verde hosts 1.81 million tonnes averaging 0.66 g/tonne Au.

 

The Maricunga Mine is an operating mine with significant infrastructure in place. The author is of the opinion that the mineral reserve estimates presented in this document are sufficient to support the operation for 16 years based on daily production of 44,000 tpd increasing to 49,000 tpd in 2012 as per the Life-of-Mine Plan approved for 2008. The larger reserve base defined in 2007 at Maricunga will require an increase in leach pad facilities.  A study for establishing an additional permanent leach pad was completed in 2006.  In 2007, CMM undertook some engineering/design work to increase leach pad capacity.  Capital costs associated with pad development, the 16 years mine life and the envisaged SART plant

 

15



 

have all been considered for this mineral resource and mineral reserve update. This document supports the December 2007 Maricunga Mineral Resource and Reserve Statement.

 

16



 

2.0          INTRODUCTION AND TERMS OF REFERENCE

 

2.1          Introduction

 

This Technical Report for the Maricunga Mine has been prepared to support the 2007 Kinross Gold Corporation (Kinross) Annual Mineral Resources and Reserves Statement and has been prepared under the direct supervision of the qualified person, Maryse Bélanger, P. Geo., Director Technical Services, Kinross Americas with contributions from CMM technical staff and Kinross Technical Services.

 

2.2          Terms of Reference

 

Unless otherwise noted:

 

·                       all units of measurement in the following report are in metric measure;

 

·                       all costs are expressed in terms of United States dollars;

 

·                       all metal prices are expressed in terms of United States dollars;

 

·                       a foreign exchange rate of $1.0 US = 530 Chilean pesos was used.

 

2.3          Scope of Work

 

The following Technical Report considered the following:

 

·                       regional and local geology, structure, alteration and mineralization;

 

·                       sample collection, preparation, security and analysis;

 

·                       quality assurance and quality control procedures;

 

·                       data entry, verification, management, security and storage;

 

·                       block modelling, grade interpolation and resource estimation;

 

·                       metallurgical recovery, plant design and performance;

 

·                       mine planning, scheduling and reserve estimation;

 

17



 

·                       leach pad expansion;

 

·                       environmental and operational permitting;

 

·                       operating and capital cost estimates and

 

·                       financial models.

 

2.4          Sources of Information and Report Basis

 

This Technical Report is based on verified historical data as well as data collected during a recent field program at Pancho in 2006.  All data was collected under the direct supervision of experienced field geologists.  Operational data since production resumed in 2005 was also considered in the mineral reserves estimates presented herewith. The updated metallurgical test work, new block models for Verde and Pancho and updated operating and capital costs form the basis of the mineral reserve and mineral resource estimates.

 

This report has been prepared under the direct supervision of the qualified person with direct contributions from CMM technical staff.  A number of other sources of information have been used in the compilation of this report and a complete list of references is provided in Section 21 of this report.

 

2.5          Field Involvement of the Qualified Person

 

M. Bélanger has been associated with the Maricunga Mine since November 2003 and has visited the site on numerous occasions during that time frame. In 2006, a total of 75 days were spent at the Maricunga mine site. Regular visits were also made during the course of 2007.

 

18



 

3.0          RELIANCE ON OTHER EXPERTS

 

This document has been prepared by Kinross Technical Services with input from Compañia Minera Maricunga. The document summarizes the professional opinion of the author and it includes conclusions and estimates that have been based on professional judgement and reasonable care and are based on the information available at the time this report was completed. All conclusions and estimates presented are based on the assumptions and conditions outlined in this report. This report is to be issued and read in its entirety.

 

The author has relied upon, and believes there is a reasonable basis to rely upon the contribution of other parties as defined below.

 

Services Provided by Other Parties

 

During the course of the fieldwork it was necessary to rely on expertise supplied by third party professionals with technical expertise beyond the experience of the field personnel managing the work. Areas impacted by the work of third party consultants are clearly noted. Kinross relied inherently on the conclusions and recommendations of the following third party consultants:

 

Golder Associates (2003)

 

Geotechnical Design Parameters

 

 

 

A. Karzulovic and Assoc. Ltda. (2007)

 

Geotechnical Design Parameters

 

 

 

McClelland Laboratories

 

Metallurgical Testing Program

 

 

 

Guillermo Contreras and Sons Limitada

 

Land Survey

 

19



 

4.0                               PROPERTY DESCRIPTION AND LOCATION

 

The Maricunga Property is located in the Maricunga District of Region III in Chile. The property is located 120 km due east of the city of Copiapó at elevations between 4,200 m and 4,500 m above mean sea level. The Maricunga Mine (formerly known as Refugio) is located at 27 degrees 33 minutes south latitude and 69 degrees 18 minutes west longitude.

 

Figure 4-1 is a generalized location map of the project.

 

Figure 4-1: Maricunga Location Map

 

 

4.1                               Claim Status

 

All surface and mineral claims, surface rights and water rights are maintained in good standing. Mining claims total 8,380 hectares while the exploration properties held by CMM include 5,900 hectares.  Chilean attorneys monitor claim status on behalf of CMM annually. No ownership issues with respect to the mineral claims hosting the project’s mineral resource and reserve estimates have been identified. The project mineral rights and claims

 

20



 

are listed in Table 4-1 below. The position of the CMM claims relative to the main infrastructure and open pit location is shown in Figure 4-2.  Figure 4-3 shows the detailed mineral rights and claims.

 

In Chile, mining claims are obtained through a judicial process that requires all survey information to be filed with the appropriate government agency. All CMM claims were surveyed by Guillermo Contreras and Sons Limitada of Santiago.

 

4.1.1                     Surface Rights

 

In addition to the mineral claim rights, CMM also holds title to surface rights at Maricunga, providing the land required for the leach pads, waste dumps, Verde pit, Pancho and Guanaco targets.  All surface rights affecting the ongoing mining activity have been reviewed. No fatal flaws have been identified that would negatively affect the development of new areas for mining activities.

 

4.1.2                     Water Rights

 

Water extraction rights, totalling 258 litres per second have been secured by CMM. Permits are in place and maintained. No issues regarding water rights have been identified that would adversely affect the project.

 

4.1.3                     Royalty Payments

 

The mine production at Maricunga is subject to royalty payments in US dollars based on the realized gold price per ounce. The underlying royalty payments for Maricunga consist of an NSR combined with payment based on Net Operating Margin (NOM).  It is effectively a sliding scale.  At a gold price of $400 the payments are equivalent to $9.471 per ounce.

 

4.1.4                     Environmental Liabilities

 

There is no underlying environmental liability affecting CMM.

 

21



 

Figure 4-2: Land Claims and Infrastructure Location

 

 

22



 

Figure 4-3: Details of Mineral Rights and Claims

23



 

Table 4-1: Mineral Rights and Claims

 

Maricunga Mine Site  Properties

Claim Name

 

Assigned Blocks

 

Hectares

 

 

 

 

 

Maricunga 1-112

 

1 through 112

 

560

Maricunga 1-40

 

17 through 20

 

20

Maricunga 1-40

 

27 through 30

 

20

Maricunga 81-120

 

97 through 100

 

20

Maricunga 121-160

 

121 through 124

 

20

Maricunga 241-280

 

261 through 262

 

10

 

 

TOTAL

 

650

 

Demasias on Maricunga

 

1 through 112 Western
Boundary

 

5,6 Aprox.

 

Buffer Zone Properties

Claim Name

 

Assigned Blocks

 

Hectares

 

 

 

 

 

Maricunga 1-40

 

1 through 16

 

80

Maricunga 1-40

 

21 through 26

 

30

Maricunga 1-40

 

31 through 40

 

50

Maricunga 81-120

 

93 through 96

 

20

Maricunga 81-120

 

113 through 120

 

40

Maricunga 121-160

 

125 through 160

 

180

Maricunga 161-200

 

161 through 167

 

35

Maricunga 161-200

 

171 through 177

 

35

Maricunga 161-200

 

181 through 187

 

35

Maricunga 161-200

 

191 through 197

 

35

Maricunga 201-240

 

201

 

5

Maricunga 201-240

 

221 through 223

 

15

Maricunga 241-280

 

241 through 260

 

100

Maricunga 241-280

 

263 through 280

 

90

Anillo Seis 1-30

 

3 through 15

 

130

Anillo Seis 1-30

 

18 through 30

 

130

Anillo Siete 1-20

 

1 through 5

 

50

Anillo Siete 1-20

 

11 through 14

 

40

Anillo Ocho 1-20

 

1 through 2

 

20

Anillo Ocho 1-20

 

6 through 7

 

20

Anillo Ocho 1-20

 

11 through 12

 

20

Anillo Ocho 1-20

 

16

 

10

Anillo Trece 1-20

 

8 through 10

 

30

Anillo Trece 1-20

 

20

 

10

Anillo Catorce 1-20

 

1 through 17

 

170

Anillo Quince 1-20

 

1 through 2

 

20

Anillo Dieciseis 1-30

 

10 through 11

 

20

Amparo Uno 1-60

 

45 through 60

 

80

Amparo Dos 1-26

 

25 through 26

 

10

Amparo Seis 1-60

 

31 through 32

 

10

Amparo Once 1-60

 

5 through 30

 

130

Amparo Once 1-60

 

35 through 60

 

130

Amparo Doce 1-36

 

1 through 36

 

180

 

 

 

 

 

 

 

TOTAL

 

1960

 

24



 

Outside Zone Properties

Claim Name

 

Assigned Blocks

 

Hectares

Maricunga 81-92

 

81 through 92

 

60

HIELO 1 1 AL 20

 

 

 

200

HIELO 2 1 AL 10

 

 

 

100

HIELO 3 1 AL 10

 

 

 

100

HIELO 4 1 AL 10

 

 

 

100

HIELO 5 1 AL 10

 

 

 

100

HIELO 6 1 AL 10

 

 

 

100

HIELO 7 1 AL 10

 

 

 

100

HIELO 8 1 AL 10

 

 

 

100

HIELO 9 1 AL 5

 

 

 

10

FRANCISCO 1 AL 10

 

 

 

100

LAGUNA 1 1 AL 10

 

 

 

100

LAGUNA 2 1 AL 10

 

 

 

100

LAGUNA 3 1 AL 20

 

 

 

200

LAGUNA 4 1 AL 20

 

 

 

200

LAGUNA 5 1 AL 30

 

 

 

300

LAGUNA 6 1 AL 30

 

 

 

300

LAGUNA 7 1 AL 30

 

 

 

300

LAGUNA 8 1 AL 20

 

 

 

200

LAGUNA 9 1 AL 18

 

 

 

180

LAGUNA 10 1 AL 14

 

 

 

130

LAGUNA 11 1 AL 8

 

 

 

80

CAMI 48 1 AL 20

 

 

 

100

CAMI 49 1 AL 40

 

 

 

200

RANCHO 1 1 AL 80

 

 

 

400

RANCHO 2 1 AL 60

 

 

 

300

 

 

 

 

 

 

 

TOTAL

 

4160

 

Exploitation Concessions Located over the Buffer Zone and the Maricunga Mine Site

Claim Name

 

Assigned Blocks

 

Hectares

 

 

 

 

 

TADEO 1 AL 70

 

 

 

350

JUAN 1 AL 70

 

 

 

350

TOMAS 1 AL 70

 

 

 

350

PEDRO 1 AL 18

 

 

 

90

JOSE 1 AL 80

 

 

 

400

SANTIAGO 1 AL 78

 

 

 

390

JUDAS 1 AL 44

 

 

 

220

PABLO 1 AL 42

 

 

 

210

MATEO 1 AL 4

 

 

 

20

MARCOS 1 AL 46

 

 

 

230

 

 

 

 

 

 

 

TOTAL

 

2610

 

Compañía Minera San Damian Exploitation Concessions

Claim Name

 

Assigned Blocks

 

Hectares

AMPARO 1 1/60

 

 

 

220

AMPARO 2 1/26

 

 

 

120

AMPARO 3 1/40

 

 

 

200

AMPARO 4 1/24

 

 

 

120

AMPARO 5 1/60

 

 

 

290

 

25



 

AMPARO 6 1/60

 

 

 

290

AMPARO 8 1/36

 

 

 

180

AMPARO 9 1/40

 

 

 

200

AMPARO 11 1/60

 

 

 

40

ANILLO 1 1/30

 

 

 

300

ANILLO 2 1/30

 

 

 

300

ANILLO 3 1/20

 

 

 

200

ANILLO 4 1/30

 

 

 

300

ANILLO 5 1/30

 

 

 

300

ANILLO 6 1/30

 

 

 

40

ANILLO 7 1/20

 

 

 

110

ANILLO 8 1/20

 

 

 

130

ANILLO 9 1/20

 

 

 

200

ANILLO 10 1/30

 

 

 

156

ANILLO 11 1/20

 

 

 

200

ANILLO 12 1/20

 

 

 

200

ANILLO 13 1/20

 

 

 

160

ANILLO 14 1/20

 

 

 

30

ANILLO 15 1/20

 

 

 

180

ANILLO 16 1/30

 

 

 

280

ANILLO 17 1/30

 

 

 

300

ANILLO 18 1/5

 

 

 

50

ANILLO 19 1/30

 

 

 

300

ANILLO 20 1/30

 

 

 

300

ANILLO 21 1/20

 

 

 

200

ANILLO 22 1/20

 

 

 

200

ANILLO 23 1/20

 

 

 

200

ANILLO 24 1/20

 

 

 

200

ANILLO 25 1/20

 

 

 

200

CORINA 1/15

 

 

 

150

LAGUNA I 1/30

 

 

 

300

LAGUNA II 1/30

 

 

 

300

LAGUNA III 1/30

 

 

 

300

LAGUNA IV 1/30

 

 

 

300

LIZ 1/30

 

 

 

300

LOIDA 1/20

 

 

 

200

MARICUNGA 41/80

 

 

 

200

MARICUNGA 81/120

 

 

 

60

MARICUNGA 161/200

 

 

 

60

MARICUNGA 201/240

 

 

 

5

MARICUNGA 201/240

 

 

 

5

MARICUNGA 201/240

 

 

 

170

REBECA 1/11

 

 

 

29

TRANQUE 1 1/60

 

 

 

300

TRANQUE 2 1/60

 

 

 

300

TRANQUE 3 1/24

 

 

 

120

TRANQUE 4 1/24

 

 

 

120

YEZENIA 1/8

 

 

 

76

 

 

TOTAL

 

9991

 

26



 

5.0                               ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY

 

5.1                               Accessibility

 

Access to the property is via 156 km of a two-lane dirt road connecting with the paved highway C-35 approximately 10 km south of Copiapó. The first 96 km of the dirt road constitute a section of a national highway crossing into Argentina. The road then branches out to the northeast to the mine site. The final 60 km is a private CMM road and it is generally in good to very good condition.

 

5.2                               Climate and Physiography

 

The property is located 120 km due east of the city of Copiapó at elevations between 4,200 m and 4,500 m above mean sea level. The Maricunga Mine is located in steep, mountainous terrain with slopes up to 35%. The site is largely devoid of vegetation with the exception of the spring-fed marshes found along the valley floors. The climate is arid with an average annual precipitation of 87 mm, most of which is realized as snowfall during the winter months (March through August).  Generally, very little precipitation occurs during the summer months (September through February). Local wildlife is sparse.

 

5.3                               Local Resources and Infrastructure

 

The Maricunga Mine site includes leaching and ADR facilities, power generation, maintenance shops, office facilities and camp. The existing infrastructure also includes an established fresh water supply system, process water supply system, truck shop, warehousing and lay down areas, an in pit crushing and conveying system and a secondary/ tertiary crushing and screening plant. Significant upgrades designed to increase production throughput were completed in 2005. They included the in-pit crushing and conveying system as well as the secondary/tertiary crushing and screening infrastructure.  All facilities are in good operating conditions.  Surface and water rights are previously discussed in Section 4.0.

 

27



 

Chile features a strong mining culture with well-established support centers in Santiago, Antofagasta and Copiapó. The town of Copiapó is the primary staging and support area for the mine with various well-established contractors.

 

28



 

6.0                               HISTORY

 

David Thomson and Mario Hernandez discovered gold mineralization at Maricunga in 1984. Shortly after their discovery, Hernandez, Thomson, and three other partners acquired the existing claims at Maricunga for Compañia Minera Maricunga (CMR).  CMR completed geologic mapping and geochemical sampling, identifying anomalous gold values in three areas:  1) Cerro Verde, 2) Cerro Pancho, and 3) Guanaco.  A detailed discussion of exploration activities by previous owners is discussed in Section 10.

 

In 1985, Anglo American Chile Limitada (Anglo) optioned the property from CMR.  Anglo explored the property for three years, returning the claims to CMR in 1988.

 

In 1989, CMR signed a letter of intent to explore the Maricunga property with Bema Gold Corporation (Bema). Bema commenced exploration fieldwork in October 1989 and from 1989 to 1991, completed 51,765 meters of drilling at Verde with an additional 5,088 meters at Pancho. Bema also commissioned Mineral Resources Development Inc (MRDI) to complete a feasibility study on the project, which indicated positive project economics. In January 1993, Bema exercised its option rights, obtaining a 50% interest in the Maricunga properties.  At the same time, CMR sold its remaining 50% interest to Amax Gold Inc. (Amax).  Amax (operator) and Bema formed Compañia Minera Maricunga (CMM), a 50/50 joint venture to develop and operate the Maricunga project. From 1993 through 1997, CMM continued developing the project, beginning commercial production in 1996.

 

The mine first operated from 1996 to 2001, producing more than 920,000 ounces of gold from 46.0 million tonnes of ore. In 1998, Kinross Gold Corporation (Kinross) acquired Amax’s 50% interest through a merger agreement.

 

Mining operations at Maricunga were suspended during the second quarter of 2001, a result of depressed gold prices. Improving gold prices during 2002 prompted CMM to evaluate options for re-opening the mine. Scoping studies quantifying the conditions necessary to re-open the mine were completed. The studies indicated that the project economics required an increase in the existing reserve base. As a result, an exploration program was developed to evaluate the reserve potential at depth at the Verde deposits and the inferred resource at the nearby Pancho deposit, located approximately 2.0 km northwest of the Verde pit.

 

29



 

A 35,000 meter drill program was approved in September 2002 with the objective of adding 20 million tonnes of Measured and Indicated resource at both Pancho and Verde. This mineralization had to be recoverable through open pit mining methods. Follow-up work to further delineate the mineralization, provide representative metallurgical samples and detailed geotechnical information would be contingent on the initial results of the drilling.

 

The information was collated and incorporated in new mineral resource and mineral reserve estimates for Verde and Pancho. The reserves were based on a detailed engineering study examining the economics of the project assuming a capital investment of $101.1 million to upgrade the existing infrastructure, allowing the plant to process 40,000 tonnes per day of Verde ore and 35,000 tonnes per day of Pancho ore. The capital investment was based on preliminary design and first-principle engineering. Capital cost estimates were prepared and verified by two, independent, North American engineering consultants with significant experience in Latin America.

 

The Maricunga Mine resumed full production in October 2005 at a rate of 40,000 tpd. Total production of 233,000 ounces from 14,333,000 tonnes at 0.74 g/t Au is reported for 2007.   Table 6-1 summarizes the production history of Maricunga.

 

Table 6-1: Annual Gold Production of the Maricunga Mine

 

 

 

Mined

 

Grade

 

Gold

 

 

 

tonnes

 

mined

 

production

 

Year

 

(x 1,000)

 

(Au g/t)

 

(ounces)

 

1996

 

7,617

 

1.03

 

101,276

 

1997

 

7,789

 

1.02

 

147,085

 

1998

 

8,207

 

0.93

 

161,046

 

1999

 

8,936

 

0.94

 

179,465

 

2000

 

8,801

 

0.94

 

169,832

 

2001

 

4,643

 

0.95

 

133,947

 

2002

 

 

 

26,094

 

2003

 

 

 

5,000

 

2005

 

6,214

 

0.87

 

121,670

 

2006

 

14,872

 

0.74

 

233,836

 

2007

 

14,333

 

0.74

 

233,000

 

TOTAL

 

81,412

 

0.88

 

1,512,251

 

 

30



 

In early 2006, CMM made the decision to drill at the Pancho deposit to better define the mineral resource both laterally and at depth since the drilling completed in 2003 focused largely on definition drilling for a $350 gold pit design. During 2007, both Verde and Pancho models were refined to better reflect a new geologic interpretation and the mining experience gained over the years. The SART process was tested for the Pancho ore as uneconomic concentrations of copper are present in ore. Some of the copper minerals are soluble in cyanide solutions and these minerals consume cyanide reagent and contaminate the leach solution with copper metal.  A feasibility study and pilot testing program were completed by Idesol of Santiago. The study considers plant design, performance metrics, operating and capital costs and implementation strategy. The mineral reserves defined at Pancho consider the application of SART.

 

31



 

7.0                                                       GEOLOGICAL SETTING

 

The Verde and Pancho gold deposits at Maricunga occur in the Maricunga Gold Belt of the high Andes in northern Chile.  Since 1980, a total of 40 million ounces of gold have been defined in the belt, (Muntean and Einaudi, 2000).

 

Basement rocks in the Maricunga area are Palaeozoic to early Tertiary age.  The oldest rocks are the Late Pennsylvanian to Triassic aged rhyolite ignimbrites and breccias of the Pantanosa Formation. This unit has been uplifted along a northerly trending, westerly dipping reverse fault.  The Pantanosa Formation is faulted over a package of interlayered redbeds and greenstones of the Monardes and Agua Helada Formations.  These formations are Late Jurassic to Early Cretaceous in age.  They comprise an east dipping (55°) sequence of strata with a thickness of 900 m. A 200 meter thick sequence of andesitic volcaniclastic sedimentary rocks overlies the redbeds and greenstones.  These strata are correlated with Late Cretaceous to Early Tertiary rocks of the Quebrada Seca, Quebrada Paipote, and Las Pircas Formations.

 

Gold mineralization at Maricunga is hosted in the Maricunga volcanic-intrusive complex of Early Miocene age. These rocks are largely of intermediate composition. Radiometric age dating indicates these rocks are between 22 to 24 Ma in age. (Muntean 1998).

 

The Maricunga volcanic-intrusive complex is exposed over an area of 12 km2 and consists of andesitic to dacitic domes, flows, and breccias that are intruded by subvolcanic porphyries and breccias (Muntean 1998).  Distinguishing between volcanic and intrusive rocks in the complex is difficult as there are only minor differences between the various units.

 

7.1                                                       Alteration

 

7.1.1                                             Verde

 

Alteration assemblages observed at Verde and Pancho are generally supportive of porphyry style mineralization but the intensity of the alteration fabric tends to be weak. Potassic alteration has been observed at Verde but generally tends to be rare. Silicification is local and patchy.  Propylitic alteration, although variable on small scale, appears ubiquitous on a

 

32



 

mine scale and in global terms does not change laterally or vertically.  For that reason, primary alteration (including silicification) zonation has not been mapped.

 

Supergene alteration, which directly affects gold recovery, occurs deeper within fracture and fault zones.  Sericite and chlorite are replaced by clay minerals, magnetite by hematite and pyrite by jarosite.  The oxidation and the leaching by meteoric waters has penetrated to variable depths within the deposits depending on the fracture intensity and faulting. The supergene alteration is accompanied by the deposition of limonite, manganese oxides, clay, sericite, jarosite along with gypsum in the argillic altered zones.

 

7.1.2                                             Pancho

 

Gold mineralization at Pancho is associated with a central zone of potassic alteration, which is manifested by replacement of mafic minerals, by fine grained, secondary biotite and magnetite. Partial replacement of plagioclase by k-feldspar can also be observed.  Muntean (1998) has documented a more restricted core to this potassic zone consisting of magnetite-k feldspar-plagioclase replacement which grades outward into the more widespread secondary biotite zone. Similar to Verde, much of the potassic alteration is obliterated or obscured by a later chlorite overprint.

 

The intermediate to upper parts of the system are dominated by pyrite-albite-clay-sericite alteration, primarily in the volcanics but also overprinting the upper parts of the potassic zone. This alteration is late and probably has a large supergene component.

 

In the uppermost parts of the system analysis indicates the presence of hypogene alunite, dickite and pyrophyllite, characteristic of epithermal, high sulfidation alteration. This hypogene assemblage occurs together with strong supergene alunite, kaolinite and other clays.

 

The presence of this high level alteration within 100 - 200 m of the potassic zone suggests strong telescoping of the system.

 

33



 

7.2                                                       Structure

 

Most of the structural trends affecting the Verde and Pancho deposits are related to fracture systems rather than fault zones. The dominant trends are north-northeast and north-northwest fracture systems that can be readily identified at Verde. At Pancho, the dominant structural trend is northwesterly, reflected not only in mineralized structures but also in late, post mineral structures.

 

One of the main structural features influencing the Pancho deposit is Falla Guatita fault zone.  Field mapping suggests that there may be significant vertical displacement on this structure.  The distinctly higher copper grades and presence of potassic alteration in the main zone suggests that the central portion of the Pancho deposit may have been down dropped. Figure 7-1 is a geological map of the Maricunga Area (after Muntean, 2000).

 

Figure 7-1: Geology of the Maricunga Mine Area

 

 

34



 

8.0                                                       DEPOSIT TYPES

 

8.1                                                       Verde

 

Gold mineralization at Maricunga has been interpreted to be porphyry style gold systems.  At Verde West, gold mineralization is centered about an elliptical porphyry plug measuring 175 by 100 m and oriented at N30°W. At Verde East, the porphyry plug measures 130 by 80 m and is oriented at N35°E. The porphyries occur within a sequence of intermediate tuffs, porphyries and breccias that are the host rocks to the gold mineralization. Lithological interpretation at Verde has identified six major lithologic units. These are:

 

·                                          Post mineral intrusives (barren)

 

·                                          Mineralized post mineral intrusives

 

·                                          Verde breccia

 

·                                          Dacite porphyry

 

·                                          Dacite tuffs

 

·                                          Laguna tuff (barren)

 

The most favourable ore hosts are the Verde Breccia and Dacite Porphyry units. The dacite porphyry is a volcanic to hypabyssal intrusive rock with 20% to 40% plagioclase phenocrysts in a fine-grained matrix.  It contains phenocrysts of biotite, hornblende, and sparse quartz.  The unit is the best host for stockwork veining, with some portions containing up to 20% quartz-magnetite ± pyrite veinlets.

 

The Verde Breccia consists of intrusive breccia and/or volcanic tuff breccia.  Its geometry suggests an intrusive origin. The unit consists of breccia with angular to rounded clasts, generally matrix supported.  The breccia is generally green to greenish gray, which is one of the diagnostic features of the unit.  The color of the rock is largely due to chlorite and occasionally epidote. The fragments range from 2 mm to greater than 2 meters in size.  Locally the unit is mostly matrix-sized material with only sparse clasts.   Clasts in the unit are generally monolithic volcanic fragments, which are often porphyritic with white plagioclase laths up to 5 mm in length.  The unoxidized rock typically contains 0.5 to 1% pyrite.  Quartz-magnetite veinlets are common in the mineralized portions of the unit.  In places, the breccia

 

35



 

is cut by fine-grained matrix material that forms clastic-like dikes.  These are generally > 2 cm in width.  They may have been formed as “fluidized” material injected into fractures at the time of the formation of the unit.

 

8.2                                                       Pancho

 

The gold mineralization at Pancho is also described as porphyry style mineralization. It occurs within a sequence of intermediate tuffs, porphyries and breccias that are the host rocks to the gold mineralization. Lithological interpretation based on the recent 2006 drill program has identified six major lithologic units. These are from older to younger rocks:

 

·                                          Hornfels – They represent less than 5% of the total volume. They were identified at depth in the Pancho porphyry system. They are present in a series of elongated bodies, sub-horizontal and intercalated with intrusive breccias and dioritic porphyry. The hornfels are also characterized by widespread intense silicification.

 

·                                          Diorite Porphyry - Rocks hypabyssal that represent 60% of the volume of the Pancho intrusive complex.   It is the most frequent host of mineralized A, B and T veinlets.  The diorite porphyry also shows signs of being intruded by a smaller intrusive phase. The porphyry displays obvious porphyry texture with 20 to 40 % phenocrysts. Phenocrysts alteration pattern include biotite or hornblende being completed altered and replaced by assemblages of chlorite-quartz-sericite-magnetite-hematite.  At depth the porphyry clearly shows potassic alteration.

 

·                                          Intrusive Breccias – The intrusive breccias represent approximately 15% of the volume of material in the Pancho complex. They are generally elongated and sub-horizontal.  These breccias are characterized by their fragments of dioritic porphyry. The fragments vary in size for mm to several cm within a matrix which is normally fine-grained. The intrusive breccias are a significant host of gold mineralization with A, B, T veinlets.

 

·                                          Diorite Porphyry (2) - This diorite porphyry is defined as a small body identified between two drill sections and found at depths ranging from 300-400 meters. 400 m. In theory, it intrudes the main porphyry but in turn is intruded by the PMI.  It is very similar to the main porphyry body in terms of mineralogy, alteration and mineralization. The main difference observed is its primary biotite that is partially altered into chlorite. It also has less veinlets than the main diorite porphyry.

 

·                                          Dioritic Post Mineral Intrusive – The Post Mineral Intrusive (PMI) identified at Pancho is not a PMI in a strict sense as there is some very low-grade mineralization associated with it.

 

·                                          Volcanic Breccias – Found in the upper portion of the deposit they represent approximately 15 % of the volume of material explored to date at Pancho. The volcanic breccias are normally sub-horizontal and discordant with the other units described.

 

36



 

Figure 8-1 shows the simplified geology model for Pancho.

 

Figure 8-1: Simplified Geology for Pancho

 

 

37



 

9.0                                                       MINERALIZATION

 

9.1                                                       Verde

 

Gold mineralization at Verde is interpreted to be the result of the fracturing and concentration of fluids in the carapace of an intrusive plug or stock. Gold is closely associated with quartz, magnetite, calcite, and garnet stockworks. Approximately 80% of the stockwork veins are generally dark grey in color, finely banded, with magnetite. The remaining 20% are principally white quartz veins. Gold mineralization is postulated to have resulted from at least 2 phases of mineralization, the first is a lower grade phase associated with copper and probably the porphyry emplacement event.  The second phase is a higher-grade gold only event possibly associated with the structurally emplaced veinlet swarms and northwest trending sheeted veinlet zones more evident in Verde East. Verde East and Verde West cover an area of 1.4 km in length by 700 km in width. Drilling has identified gold mineralization to a depth of a 600 m.

 

9.2                                                       Pancho

 

The porphyritic diorite intrusives and intrusive breccias are the main hosts for mineralized veins. Mineralization is also hosted by the volcanic rocks. The mineralization is commonly related to the various geologic features listed below:

 

·                                          directly associated with the presence of B, A and T veinlets

 

·                                          in silicified zones, normally micro-granular and a dark grey color, with or without the presence of magnetite

 

·                                          associated with intrusive breccias

 

·                                          in contact zones such as the contact between the intrusive breccia with the volcanic breccia or the contact between the intrusive breccia and the diorite porphyry

 

In the porphyry the veins are present in stockwork or sheeted veins. They are generally subvertical and have a strong, preferred north-westerly strike. The northwest structural control is evident not only at outcrop scale but is also reflected in the northwest alignment of intrusives and the three centers of mineralization in the district, Verde, Pancho and

 

38



 

Guanaco.  The mineralization outlined to date at Pancho comprises an area of 800 m by 700 m.  Gold porphyry mineralization was identified in drilling at depths exceeding 600 m.

 

39



 

10.0                                                EXPLORATION

 

Exploration of the Verde and Pancho deposits has been ongoing since 1984 when the Maricunga Property was identified as a gold prospect in 1984 by David Thomson and Mario Hernandez during a field visit to areas of alteration.  The existing claims on the property were acquired by the partnership Companio Minera Maricunga (CMR) consisting of Hernandez, Thomson, and three other partners.

 

CMR subsequently completed a program of geological mapping, rock chip and geochemical sampling and identified three large areas of alteration with anomalous gold values.   These areas were named Cerro Verde, Cerro Pancho and Guanaco.

 

In December 1985, CMR optioned the Maricunga Property to Anglo American for 3 years.  During that period Anglo American accomplished the following:

 

·                                          Geological mapped the property at a scale of 1:5,000

 

·                                          Collected 2,161 surface samples over an 8 km2 area and assayed for gold, silver, copper, molybdenum and zinc.

 

·                                          Constructed 7.5 km of roads

 

·                                          Geologically mapped Pancho and Verde at 1:1,000 scale

 

·                                          Cut 6,000 m trenches on Pancho; collected and assayed 1,682 samples

 

·                                          Cut 7,500 m of trenches on Verde; collected and assayed 2,350 rock samples

 

·                                          Drilled 45 percussion drill holes on Pancho to average depths of 50 m (total of 2,234 m), along with 6 diamond drill holes (total of 366 m).

 

·                                          Drilled 35 percussion holes, also to a depth of 50 m on Verde (total of 1,744 m).

 

Anglo American’s exploration program outlined broad areas of gold mineralization on Pancho, Verde and Guanaco, targeted by geochemical anomalies of +100 ppb gold in the soil.

 

40



 

In December 1988 the property reverted to the owners.  In early 1989, CMR solicited bids from twelve mining companies for Maricunga; in July, Bema was chosen and in September a letter of intent was signed.  Field work commenced the following month.

 

Phase I of the Bema program was designed to test the gold mineralized zones on Verde, which showed much greater depths of oxidation than Pancho.  Since 1989, drilling has been the primary means of exploration.  Drilling on the property is further summarized in Section 11.

 

41



 

11.0                        DRILLING

 

Historically, most of the drilling at Maricunga consisted of reverse circulation drilling. The destructive nature of this drill method made identification of lithology, structure and alteration difficult. The 2002 - 2003 drilling consisted primarily of diamond drill core, providing site geologists with an opportunity to refine the geology model of the deposit.

 

The preferred orientation of drilling for the Verde deposits is 060 - 240° azimuths.  At Pancho, the preferred orientation for the drilling grid of 038 – 218° was established based on the northwest strike of veinlet swarms observed in drill roads. The surface expression of the Pancho system is approximately 700 m by 800 m. The depth for the most recent drill holes was generally determined using a $600 gold pit and the limits of the porphyry mineralization at depth have not been clearly defined as of yet. The mineralization being disseminated in nature also implies that its geometry and size are not limited to a vein. Therefore, the concept of true thickness in drill holes does not apply to Pancho and Verde.

 

The 2006 exploration campaign followed the same field procedures implemented in 2002-2003. A total of 667 holes (103,392 m) of drilling has been completed on the Verde deposit with an additional 210 holes (56,748 m) completed at Pancho. The drilling has resulted in a drill spacing of approximately 50 x 50 meters at Verde and 75 x 75 meters at Pancho.  Table 11-1 summarizes the various drill campaigns at Verde and Pancho.

 

Table 11-1: Exploration Drill Summary

 

 

 

 

 

Verde

 

Pancho

 

Company

 

Year

 

RC

 

RC

 

Core

 

Core

 

RC

 

RC

 

Core

 

Core

 

 

 

 

 

(#)

 

(m)

 

(#)

 

(m)

 

(#)

 

(m)

 

(#)

 

(m)

 

Bema

 

1989

 

45

 

5,060

 

 

 

 

 

 

 

Bema

 

1990

 

231

 

46,705

 

31

 

4,083

 

 

 

 

 

Bema

 

1991

 

 

 

6

 

1,090

 

24

 

5,088

 

 

 

Subtotal

 

 

 

276

 

51,765

 

37

 

5,173

 

24

 

5,088

 

 

 

CMM

 

1993

 

176

 

5,060

 

 

 

 

 

 

 

CMM

 

1994

 

 

 

6

 

4,083

 

 

 

 

 

CMM

 

1997

 

 

 

 

 

15

 

4,296

 

 

 

CMM

 

1998

 

 

 

18

 

6,689

 

 

 

 

 

Subtotal

 

 

 

176

 

5,060

 

24

 

10,772

 

15

 

4,296

 

 

 

CMM

 

2003

 

20

 

3,154

 

134

 

27,468

 

39

 

6,710

 

69

 

14,146

 

CMM

 

2006

 

 

 

 

 

18

 

4,012

 

45

 

22,496

 

TOTAL

 

 

 

472

 

59,979

 

195

 

43,413

 

96

 

20,106

 

114

 

36,642

 

 

42



 

It should be noted that all the RC holes drilled in 2006 were effectively pre-collar holes down to a depth of approximately 200 m. The holes were completed with a diamond drill rig to depths averaging 400 m.  Figures 11-1 and 11-2 are plan maps of Verde and Pancho showing the completed drill holes as at December 31, 2007.

 

11.1                        Rig Setup and Survey

 

All proposed drill locations were laid out in plan and on section. The collar coordinates were provided to the mine survey crews who laid out the drill pad locations in the field using total station theodolites. Pad locations were verified prior to construction to ensure access and safety. After pad construction, the mine survey crews established the collar location and marked it in the field. They also established the front sight and back sights necessary to provide the drill direction. After the drill was moved onto the setup and prior to the start of drill, geological staff verified the drill alignment and inclination using a compass. The survey crew later verified alignment and inclination when the drill hole was in progress.

 

Downhole inclinometry was completed at the end of each hole. Gyroscopic azimuth and inclination readings were taken every 10 meters down the hole to within ten meters of hole bottom and every 50 meters back up the hole as a double check.

 

11.2                        Topographic Base and Survey Audit

 

In 2002-2003, all field surveys were tied into the established mine grid. Survey data was incorporated into current as-built plans that were updated and maintained in AutoCAD by the survey crews. Guillermo Contreras and Sons Limitada (Santiago), licensed Chilean surveyors, completed a survey audit that verified an approximate 10% of the drill collars using a differential GPS survey system. No significant errors were noted.

 

11.3                        Core Handling, Storage and Security

 

Drill core was placed in labelled boxes, fitted with lids and transported to the site logging facility by pick-up. All core logging was completed at a facility located at the Maricunga mine site.  Only CMM personnel worked with the drill core.

 

43



 

Figure 11-1: Verde Drilling Coverage as December 31, 2007

 

 

Figure 11-2: Pancho Drill Coverage as at December 31, 2007

 

 

44



 

12.0                        SAMPLE METHOD AND APPROACH

 

12.1                        RC Drilling

 

CMM provided all of the technical support for the sampling, geologic logging, and drill supervision.  Rig geologists and samplers were responsible for the quality/accuracy of each sample. Geologists and samplers typically had up to 15 years experience sampling.

 

The 2003 drill program adopted a 2.0 meter standard sample length for all samples. The same procedure was followed for the samples in 2006.

 

When drilling dry, reverse circulation drill cuttings were directed from the cyclone to a Gilson splitter where the sample was reduced to a 6-8 kg sample. Typically, this required a 1/8 split of the drill cuttings. The hole and cyclone were blown clean after each rod change. Two samples, an original and a duplicate, were produced for each 2.0 meter interval. The samples were weighed, and the weight, number of splits and hole diameter were recorded. The samples were bagged and tagged and prepared for transport to the on-site sample preparation facility. The splitter was air cleaned after each sample.

 

When sampling wet, a rotating wet sampler replaced the Gilson splitter below the cyclone.  Usually ground water flow was not sufficient and make up water was necessary to provide uniform flow to the splitter.  As with the dry sample collection, two samples
(6 – 8 kg.) were collected in perforated sample bags at the exit port of the wet splitter.  These samples were not weighed immediately but were left to drain for a 24 hour period prior to transport to the sample preparation facility.

 

It should be noted that the drill holes completed in the winter of 2006 did not encounter any water.

 

Typical chip trays were produced for logging and future reference. In addition, a 100 g, unwashed sample (reference sample) was collected for each 2.0 meter interval. All chip trays and reference samples were placed in permanent storage at site.

 

The samples are considered representative by the author who has visited the drill sites on many occasions.

 

45



 

12.2                        Core Drilling

 

Drill core was received and laid out for logging and sampling at the core logging facility. The first sample of each core hole was marked from the start of core recovery to the end of the first even meter. From that point, samples were laid out every 2.0 meters downhole.  Sample numbers were marked on the core box edges, accounting for number gaps for QA/QC sample insertion. Logged and marked boxes of whole core were transferred to the ALS Chemex sample preparation facility where chain of custody was transferred from CMM to ALS Chemex.

 

CMM received the sawn core, in the original labelled boxes, from ALS Chemex after splitting. The half-cores were stored shipping containers at the Maricunga site. In all, ten containers were used to store the half-core library.

 

Core sample rejects are bagged in plastic, labelled and received from the ALS Chemex sample preparation facility.  These bags are placed in cubic meter wooden bins.  The bins are labelled according to hole number and sample range.  The bins are stored beside the core containers and are locked in a covered storage compound.

 

The samples are representative of the mineralization intercepted at Pancho. The author visited the drill sites at a minimum once a month during the 2006 exploration. The author is satisfied that all established procedures were properly followed by the field staff.

 

12.3                        Logging

 

Experienced geologists logged the reverse circulation chips and drill core at Maricunga. Reverse circulation chips were typically logged at the drill while core was typically logged at the core logging facility. All logging utilized standardized logging forms and a geological legend developed for the Verde and Pancho deposits. The legend has evolved from historic observation and is consistent with both the regional and local geology. The legend and logging records lithology, alteration, structure, geology, mineralization and oxidation (of pyrite) for each two meter sample interval, reducing the geological descriptions to numeric or alphanumeric codes. Unique features not accounted for in the legend are noted in written comments.  The legend stresses oxidation conditions of pyrite, veinlet mineralization, location and amount of magnetite and occurrence of typical porphyry alteration minerals.

 

46



 

In 2002-2003, Golder Associates from Santiago (Golder) identified all holes requiring detailed geotechnical logging that was completed by Golder trained staff. CMM geologists typically recorded both Rock Quality Designation (RQD) and recovery data for each hole. Recoveries averaged better than 95% during the 2003 program. In 2006, average core recovery was 96%.

 

12.4                        Geotechnical Core Logging

 

Golder managed the geotechnical program.  Francisco Carrasco, (Project Manager) and Joaquin Cabello (Assistant Manager) supervised the filed programs and provided the initial training. The program included detailed geotechnical logging of selected drill holes, uniaxial compressive strength (UCS) testing of selected cores, completion of a seven (7) hole oriented core program and cell mapping of existing pit walls and road cuts. Golder also managed a hydrology study including installation of piezometer wells for monitoring water levels.

 

Golder provided all initial training and completed frequent site visits to maintain quality control of the work and upgrade training of the field staff performing the work.

 

CMM adopted identical geotechnical logging procedures in 2006 under the supervision of the same geotechnical engineer employed by CMM in 2003.

 

12.5                        Composite Sample Summary

 

The full composite summary for both Verde and Pancho are shown in Tables 17-4 and 17-5 respectively.

 

47



 

13.0                        SAMPLE PREPARATION, ANALYSES AND SECURITY

 

13.1                        Sample Preparation

 

In 2002-2003, all sample preparation, including core splitting (sawing) was performed and supervised by ALS Chemex personnel. ALS Chemex established, equipped and staffed a portable sample preparation facility at the Maricunga mine for the duration of the program. The sample preparation facility included two rock saws, three drying ovens, two Rhino jaw crushers and a Jones riffle splitter.

 

After logging and sample mark up, the core boxes were sent to the sample preparation facility. ALS Chemex personnel physically sawed the core. The core splitter randomly selected the split line. Core splitters were trained to maintain the same cut line on contiguous pieces of core wherever possible. After splitting, one half of the core was placed in sample trays along with the sample tag. These were placed in the drying ovens for drying. The other half of the core was fitted back into the core box and returned to CMM for placement in permanent storage.

 

All samples were dried for 4 – 6 hours at 70° Celsius. For wet reverse circulation samples, the dry time was increased to 24 hours. After drying, sample weight was recorded and the sample was single pass crushed to 90% passing 2 mm using the Rhino Jaw crushers. The crushers were cleaned with air after each sample and cleaned with barren quartz after every five (5) samples. Crush size was monitored after every 20 samples to ensure that the final product met the crush size specification.

 

After crushing, the entire sample was passed through a Jones riffle splitter, reducing the sample size down to a nominal 1.0 kg size. A preparation duplicate was collected every forty (40) samples. The duplicate was distinguished by an “A and B” designation and treated as per the standard sample procedure.  The coarse rejects were returned to the original sample bag, labelled and returned to CMM for storage.

 

The 1.0 kg samples were sealed in plastic bags, labelled, packed in crates and transported to the primary analytical facility (ALS Chemex – La Serena) for analysis. The laboratory has ISO 9001-2000 accreditation.

 

48



 

13.2                        Sample Preparation 2006

 

In 2006, only core splitting (sawing) was performed at the Maricunga site. All samples were shipped to Actlabs in La Serena where sample preparation was performed using exactly the same procedure as described above. Actlabs also has an ISO 9001-2000 accreditation.

 

13.3                        Analysis

 

The prepared samples were received at the ALS Chemex’s facility in La Serena (the primary analytical lab for the duration of the program) where analyses for Au, Ag, Cu and cyanide soluble Au and Cu analyses were performed.

 

On receipt of the samples the work order numbers and sample numbers were recorded and the samples were arranged for analysis based on the individual sample numbers. The entire 1.0 kg sample was pulverized to 95% passing -150 mesh using an LM-2 pulverizer. The pulverizer was cleaned with compressed air after each sample. Sieve analyses were performed after every 20th sample to ensure the final product met the stated specification of 95% passing –150 mesh.

 

After pulverization, the sample was reduced to a 300 gram sample and 700 gram reject. The reject placed in labelled plastic bags and returned to CMM for storage.

 

The 300 gram sample is homogenized. After homogenization:

 

·                                  a 50 gram aliquot is selected for fire assay with atomic absorption finish for gold,

 

·                                  a second aliquot is selected for total digestion atomic absorption analyses for silver and copper,

 

·                                  a 20 gram aliquot is selected for cold cyanide soluble gold analysis, leached for 4 hours with 60 ml of cyanide solution (0.1% NaOH & 0.5% NaCN).

 

·                                  A 1 gram aliquot is selected for cold cyanide soluble copper analysis, leached for 2 hours with 20 ml of cyanide solution.

 

Dr. B. Smee (Smee and Associates Consulting Ltd.) completed operational audits of the La Serena lab for the 2002-2003 program. The operational audits were performed measuring compliance with analytical best practices as well as to NI-43-101 requirements with respect

 

49



 

to quality control and quality assurance. Dr Smee did not note any significant problems with this facility, concluding that ALS Chemex’s lab and procedures met the highest industry standards.

 

Initially, ALS Chemex assigned work order numbers at the mine site but in March 2003 a Lab Information Management System (LIMS) was adopted and work order numbers were generated from a centralized ALS Chemex location.

 

Results containing Au, Ag, Cu or CN Au, CN Cu were sent via digital mail to the Project and Office Managers.  Attachments included 1 file per hole, identified by work order number and hole number.  The file included internal ALS Chemex blanks and duplicates, while results of ALS Chemex standards were reported monthly in a separate file.

 

ALS Chemex was also requested to send from a list chosen by CMM 3 batches of pulps (1/40 samples) to Assayers Canada in Vancouver.  Dr. Smee audited the Assayers laboratory in February 2003 and found them acceptable to qualify as a referee lab for the project.

 

13.4                        Quality Control / Quality Assurance

 

13.4.1              Drilling 2002-2003

 

The original QA/QC program was designed and monitored by Dr. B. Smee. The program included the insertion of one blank, one standard, and one duplicate (randomly selected) for each batch of 40 samples. Standards were not available for insertion for the first 3 weeks of the program. The standards were designed by Dr. Smee and provided by Rocklabs, New Zealand. Dr. Smee selected the standards to best match Maricunga rock types and grades. Standards were designed to monitor gold grade only. The standards were not blind to the analytical lab.

 

Duplicate samples were randomly selected within the sample batches.  Reverse circulation duplicates were taken as an opposite split post cyclone and given a sequential sample number.  RC duplicates were not taken below the water table. As the duplicate was generated in the field, no ALS Chemex personnel could identify these samples as duplicates.  For core, two duplicates of one interval were taken.  The first (d1) was a second

 

50



 

split of post crusher product.  The second (d2) was the actual other half of sawn core.  The intent was to see the variance according to crushing procedure (d1) and also the variance according to natural geological variance + crushing procedure.   This would also allude to any bias in core sawing activity.  In the core duplicate samples, obviously ALS Chemex sample preparation personnel knew which samples were being duplicated, while ALS Chemex analytical personnel did not.

 

ALS Chemex also inserted their own blanks, standards and duplicate samples for each sample batch as part of the labs own internal quality management program.

 

13.4.2              Drilling 2006

 

The same overall QA/QC procedures were implemented during the 2006 exploration campaign. The results were compiled as soon as received by the site staff.  Results for standards were plotted using two standard deviations as lower and upper limits.

 

The charts were kept updated and any anomalous results were discussed with Actlabs.

 

13.4.3              Table of Failures

 

The Senior Geologist extracted the QA/QC sample results from the digital result files based on the sample numbers. If a standard assay fell outside 3 standard deviations of the standard value, the entire batch of 40 samples was rerun.  If 2 consecutive standard assays fell within 2 standard deviations of the standard value, a batch rerun was requested. If a blank exceeded 0.05 g/t au, a batch rerun was requested.   No reruns were determined from duplicate data.

 

Monitoring of the QA/QC data required a total of 17 batch reruns (649 samples) based on standards failures. This represented approximately 2% of the total analyses run for the project. Inspection of batch failure results indicates minimal bias with both gold and copper relative to the repeat batch assays.  At the end of the project, an additional nine QA/QC batch assays (347 samples) were selected based on standards failures.  Three additional batches plus 11 individual samples (127 total) were found to have CNAu at least 0.10 g/t au greater than the total gold assay.  These were also rerun for both total and cyanide.

 

51



 

13.4.4     Analysis of QA/QC Data

 

For the 2002-2003 drilling program all standard, blank and duplicate results were sent to Dr. Smee for analysis.  Duplicate results were analyzed for precision and plotted on Thompson Howarth graphs. Dr. Smee found the error rate and duplicate variance normal for porphyry gold deposits.  In his final report, (July 20,2003) he concluded the gold assay database to be of commercial quality but raised concerns about eight of the 650 ALS Chemex digital files.  All eight files, containing failures, had already been reanalyzed, were determined to have had CMM field labelling errors, or were duplicated assay sets.

 

The 2006 QA/QC data was compiled as it was received by the geologists at the site. Any anomalous results were flagged and the lab contacted directly to discuss the variations observed. A series of samples representing approximately 10% of the total were also sent to ALS Chemex as an independent check.

 

13.4.5     Referee Laboratory

 

Assayers Canada (Assayers), Vancouver, was selected as the referee laboratory for the program. Assayers Canada has achieved Certificates of Laboratory Proficiency from the Standards Council of Canada for precious and base metal analysis.  One pulp per ALS Chemex batch of 40 was selected at random, including the CMM standards, blanks and duplicates.  Additionally one of the 3 CMM standards was inserted in this sample stream to check Assayers at a frequency of 1 per 40. Three batches of checks (631 samples in total) were sent to Assayers over the duration of the program.  Results were forwarded to Dr. Smee who concluded that the two labs essentially agreed on gold and cyanide soluble gold analysis within normal precision limits.

 

13.4.6     Statement of Author’s Opinion

 

The author concurs with Dr. Smee’s opinion that the slight variations observed were within normal precision limits.

 

52



 

14.0        DATA VERIFICATION

 

14.1        General 2002-2003

 

Kinross Technical Services verified the Initial Database (IDB) to copies provided by Bema Gold Corporation and MRDI.

 

Original drill logs, assay certificates, survey worksheets and other original data were located and used to verify the data contained in the IDB.  Verification of the historical data included:

 

·                                          Collar location

 

·                                          Collar azimuth and dip

 

·                                          Downhole azimuth and dip

 

·                                          Total gold and copper analyses

 

·                                          Cyanide soluble gold and copper analyses

 

·                                          Primary lithology code

 

·                                          Primary alteration code

 

·                                          Primary oxidation code

 

Assay certificates, and original logs were found for approximately 80% of the historical data.

 

For the 2006 Pancho drill program a system of double entry was established. It included all of the items listed above plus the geology logs as prepared by the field geologists. The final grade database was compiled by Kinross Technical Services (KTS). KTS and CMM assumed that the historical data used in the past was sufficiently free of errors or omissions. Details of the data verification process and database management for 2002-2003 are provided in the following paragraphs.

 

53



 

14.2        Pre-2002 Data Verification

 

14.2.1     Collar Data

 

Verification of the historic collar data identified one error of note. Collar coordinates of drill holes completed between 1986 and 1987 did not match the coordinates recorded on original survey sheets.  This error was also corrected.

 

14.2.2     Survey Data

 

Much of the historical downhole survey data could not be located. The limited downhole survey data that was located was used to verify the data in the IDB. No significant errors were noted.

 

14.2.3     Lithology, Alteration, Oxidation, Vein and Mineralization Data:

 

Ten percent of all lithology, alteration, oxidation, vein description and mineralization data for the 1997 – 1998 drill campaign was verified as this data was collected using field practices and logging formats consistent with the 2002-2003 effort.

 

14.2.4     Analytical Data

 

Ten percent of the historical analytical results in the IDB were verified against original assay certificates.  Rare errors were detected during the verification process but these were almost exclusively related to the recording of results below the detection limit for successive programs.

 

14.3        2002-2003 Data Verification

 

14.3.1     Collar Data

 

Prior to entering collar data into the database, collar locations were visually checked for obvious errors such as transposed northings and eastings. Once entered, collar coordinates and hole lengths were extracted and printed for direct comparison to the original survey certificates.  The collar coordinates were compared against the signed surveyors’ certificate and the hole length were checked against the geologists’ logs.  Three independent checks of

 

54



 

this information yielded rare errors. Collar information was also digitally checked against the surveyors’ final compilation file; this check also yielded rare decimal place errors. Erroneous data was corrected and reloaded.  The corrected data was subjected to two additional independent checks.

 

14.3.2     Survey Data

 

Prior to entering the downhole survey data into the database it was visually scanned for obvious errors. After entry, the data was extracted and printed for manual verification relative to the original downhole survey data contained in the files and provided by Comprobe. Data verification of 10% of the downhole survey data was completed for the survey data.  Two independent checks of this data detected no errors.  Visual inspections of the plotted hole traces also failed to identify any obvious errors or miss-plots.

 

14.3.3     Lithology, Alteration, Oxidation, Vein and Mineralization Data

 

Lithology, Alteration, Oxidation, Vein Description and Mineralization data collected during the 2002-2003 field season was verified against the original logs.  A 10% check of the database yielded an unacceptable amount of errors and led to a 100% check.  The 100% check yielded an error rate of 3.5%, with most of the errors related to the recording of alteration. These errors were corrected.

 

14.3.4     Analytical Data

 

A random 10% of the analytical data was verified against the original assay certificates.  Only rare errors were detected, usually pertaining to how results below detection were entered in the database.   Erroneous data was corrected and re-entered.

 

14.3.5     Geotechnical Data

 

Ten percent of the geotechnical data collected during the 2002-2003 field program was verified against the original geotechnical logs yielding a significant error rate. As a result, a 100% verification process was initiated. Significant error rates were noted in the fractures-per-meter field.   Error rates in the structural measurement and RQD fields were related to format errors rather than data entry errors. These errors were corrected.

 

55



 

The QA/QC Database Manager has certified that the database as transferred to Kinross Technical Services on CD-R media is free of gross errors and omissions and is suitable for estimating resource and reserve estimates.

 

14.4        Data Entry, Storage, Management and Security

 

The QA/QC Database Manager was responsible for updating and managing the Project Database (PDB). Only the QA/QC Database Manger could access, update or otherwise modify the PDB. Regular backups were made to CD-R disks over the duration of the program. The final PDB was transferred to Kinross Technical Services to be used in resource modeling.

 

14.4.1     Data Entry

 

Collar Coordinates

 

The mine survey department entered collar coordinates, drill azimuth and inclination into spreadsheets that were provided to the QA/QC Database Manager. The QA/QC Database Manager checked the spreadsheet data against original survey field notes prior to importing the data into the PDB.   Cross sections and drill hole composite plans were plotted using Gemcom software and were inspected by the Senior Geologist for collar and directional errors. Final hole depths were verified against the drill log hole depth.

 

Downhole Survey Data

 

Comprobe provided the downhole survey data in spreadsheet format to CMM’s Office Manager who checked the data for obvious errors. Once satisfied that the downhole survey data was correct, the Office Manager provided the spreadsheet files to the QA/QC Database Manager for import into the PDB.

 

Lithology, Alteration, Mineralization and Oxidation

 

The Office Manager and Data Entry Clerks entered data from the field lithology logs into spreadsheets, one for each hole.  A double-blind entry system was not used in recording this data. A 100% manual check of this data was performed at the end of the drill program.

 

56



 

Assay Data

 

Assay results were received as digital files, identified by work order number and hole number. The assay files included individual sample numbers allowing the samples to be matched to the sample intervals. The digital files were imported into spreadsheet files that were verified back to the original assay files prior to being imported into the PDB.

 

QA/QC Data

 

The Senior Geologist matched assays to sample numbers on the original log and extracted the QA/QC data from the sample stream into an excel spreadsheet which was used to monitor QA/QC data independently from the sample stream. The QA/QC data was sorted into worksheets for blanks, standards and duplicates.  The entire file was cross-checked between the Project Manager’s copy and the Senior Geologist’s copy. Once satisfied that the data was free of error it was sent via email to Dr. Smee for final analysis.

 

14.4.2     Data Storage

 

The PDB was established and maintained using Gemcom modeling software. The PDB was backed up on CD-R media on a regular basis for the duration of the field program. Once the PDB was fully updated with all the results collected during the 2002-2003 programs, the data was copied and forwarded to Kinross Technical Services in CD-R format. This database is referred to as the Final Database (FDB).

 

In addition to the digital files, all available hard copy data was organized and inventoried on a per hole basis. This information was copied in triplicate with one copy forwarded to Kinross Technical Services, one copy forwarded to Bema and a final copy stored at the Maricunga Mine. Original hard copy data was packaged and stored at the CMM office in Copiapó.

 

14.4.3             Data Management and Security

 

Only the QA/QC Database Manager had the necessary file access permissions to update the PDB. Only Kinross’ Manager of Technical Services could access and modify the FDB.

 

57



 

15.0        ADJACENT PROPERTIES

 

The Maricunga Project is located within the Maricunga Gold Belt of northern Chile.  Since 1980, a total of 40 million ounces of gold have been defined in the gold belt, (Muntean and Einaudi, 2000).

 

The Maricunga Gold Belt hosts numerous mineral deposits of economic interest including:

 

·                                          La Coipa, an epithermal gold-silver mine owned and operated by Kinross

 

·                                          Marte-Lobo, a gold porphyry deposit that was partially developed by Teck Corporation and,

 

·                                          Cerro Casale, a large (1.035 billion tonnes), undeveloped, porphyry copper-gold deposit that is a joint venture between Barrick Gold (51%) and Kinross (49%).

 

No information from adjacent properties has been used in the exploration program or in the estimation of the mineral resource.

 

58



 

16.0        MINERAL PROCESSING AND METALLURGICAL TESTING

 

The 2002-2003 Exploration Program included the following metallurgical and physical property test work for both Verde and Pancho:

 

·                                          cyanide soluble gold analyses

 

·                                          cyanide soluble copper analyses

 

·                                          direct agitated cyanidation tests (bottle roll)

 

·                                          column leach tests

 

·                                          Bond work index tests

 

·                                          specific gravity determinations

 

·                                          Acid Based Accounting (ABA) tests

 

The 2006 drill program on Pancho also provided representative material to perform additional metallurgical testing. Cyanide soluble gold and copper analyses were systematically completed for all samples.  Recent test work included bottle roll and 14 column leach tests. The results based on the 2006 data collection are summarized separately in this section.

 

Finally, during 2007 the SART process was considered for the Pancho ore as uneconomic concentrations of copper are present in ore. Some of the copper minerals are soluble in cyanide solutions and these minerals consume cyanide reagent and contaminate the leach solution with copper metal.  A feasibility study and pilot testing program were completed in 2007. The study considers plant design, performance metrics, operating and capital costs and implementation strategy. The reserves defined at Pancho consider the application of the SART process.

 

59



 

16.1        Metallurgical Test Work 2003

 

16.1.1     Cyanide Soluble Assays

 

Both gold and copper cyanide soluble analyses were routinely analyzed for Verde and Pancho. Results were used to guide selection of samples for bottle roll and column leach tests. Cyanide copper analyses were also used to adjust process operating costs during pit optimization of the resource model for Pancho. The mechanics of the Process Cost Adjustment Factor (PCAF) are discussed elsewhere in this report.

 

16.1.2     Direct Agitated Cyanidation (Bottle Roll) Tests

 

Bottle roll composite samples were selected from the half core library based on lithology, oxidation state, grade and spatial location. A total of 43 bottle roll samples were selected from the Verde with an additional 15 samples collected from Pancho. The samples were shipped to McClelland Laboratories, Nevada for testing.

 

The gold grade selection criteria used for selection of the bottle roll tests were:

 

·

 

Low grade

 

0.50 to 0.75 g/t

 

 

 

 

 

·

 

Mid-grade

 

0.75 to 1.00 g/t and

 

 

 

 

 

·

 

High grade

 

>1.0 g/t

 

Oxidation state was determined based on the visual logging of oxidation noted in the geological logs. Three distinct oxidation levels were defined.

 

·

 

Oxide

 

>90% oxidation of sulphide

 

 

 

 

 

·

 

Mixed

 

between 10% and 90% oxidation of sulphides and

 

 

 

 

 

·

 

Sulphide

 

<10% oxidation of sulphides.

 

 

 

 

 

Samples were selected from the four major ore bearing lithologies, post mineral intrusives and Laguna tuffs were not sampled.

 

60



 

Sample selection was restricted within an optimized pit shell generated at a US $400 gold price.  Table 16-1 summarizes the Bottle Roll sample selection.

 

Results of the bottle roll tests show distinct differences in recovery based on the level of oxidation. Oxide ores exhibit higher recoveries than mixed ores which, in turn, demonstrate higher recoveries than the sulphide ores. These findings agreed with the historical metallurgical test work and experience gained from mining in the Verde area.  A summary of the bottle roll test results is presented in Table 16-2.

 

Table 16-1: Summary of Bottle Roll Sample Selection

 

 

 

Gold Grade

 

 

 

Low

 

Medium

 

High

 

Deposit

 

(0.50 - 0.75)

 

(0.75-1.00)

 

(>1.00 g/t)

 

Pancho

# of samples

 

5

 

5

 

5

 

Verde W

# of samples

 

5

 

5

 

11

 

Verde E

# of samples

 

9

 

5

 

10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Oxidation

 

 

 

 

Oxide

 

Mixed

 

Sulphide

 

Deposit

 

 

(>90%)

 

(10-90%)

 

(<10%)

 

Pancho

# of samples

 

6

 

3

 

6

 

Verde W

# of samples

 

8

 

5

 

8

 

Verde E

# of samples

 

9

 

6

 

9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Lithology

 

 

 

 

 

 

 

 

Mineralized

 

 

 

 

 

 

 

 

 

 

Post Mineral

 

Dacite

 

Deposit

 

 

Diorite

 

Breccia

 

Intrusive

 

Porphyry

 

Pancho

# of samples

 

6

 

9

 

 

 

Verde W

# of samples

 

 

7

 

5

 

9

 

Verde E

# of samples

 

 

9

 

6

 

9

 

 

Table 16-2: Summary of Bottle Roll Results

 

 

 

Oxidation

 

Au
Recovery

 

Deposit

 

Class

 

(%)

 

Verde

 

Oxide

 

72.3

 

 

 

Mixed

 

63.8

 

 

 

Sulphide

 

53.0

 

Pancho

 

Oxide

 

83.0

 

 

 

Mixed

 

72.8

 

 

 

Sulphide

 

68.6

 

 

61



 

16.1.3        Column Leach Tests

 

Results of the bottle roll tests were used to target specific areas of the deposit with the HQ diameter drill holes that were used to collect the sample material necessary for column leach analysis. Composite samples were collected from whole HQ diameter core that was drilled specifically for the metallurgical test program. A total of 10 HQ diameter holes (1,500 meters) of core were drilled at Verde for the purpose of column leach tests.  An additional seven (7) samples were collected at Pancho but unlike the Verde samples, the Pancho samples were taken from remaining half cores available at the time of sample selection.

 

For the Verde samples, column tests were established for three different product sizes (6.3, 9.5 and 15.8 mm). The same sample selection matrix established for the bottle roll tests guided column leach sample selection. Grade of the HQ diameter core was confirmed by cutting a sliver sample for each two-meter interval.  Table 16-3 summarizes the Column Leach Sample program.

 

Table 16-3: Summary of Column Leach Sample Selection

 

 

 

Gold Grade

 

 

 

Low

 

Medium

 

High

 

Deposit

 

(0.50 - 0.75 g/t)

 

(0.75 – 1.00 g/t)

 

(>1.00 g/t)

 

Pancho

# of samples

 

2

 

2

 

3

 

Verde West

# of samples

 

2

 

2

 

1

 

Verde East

# of samples

 

2

 

2

 

2

 

 

 

 

Oxidation

 

 

 

Oxide

 

Mixed

 

Sulphide

 

Deposit

 

(>90%)

 

(10-90%)

 

(<10%)

 

Pancho

# of samples

 

3

 

1

 

3

 

Verde West

# of samples

 

 

 

5

 

Verde East

# of samples

 

3

 

3

 

 

 

Results of the column leach tests matched the bottle roll results. Table 16-4 summarizes the results of the column leach tests completed as part of this study.

 

62



 

Figures 16-1 and 16-2 are plan views of the Verde and Pancho pits showing the original metallurgical sample distribution within the 2002-2003 design pit shells.

 

Table 16-4: Summary of Column Leach Test Results

 

Deposit

 

Ore Type

 

Crush Size

 

Au
Recovery

 

 

 

 

(k80 mm)

 

(%)

West

 

 

 

15.8

 

44.0

Verde

 

Sulphide

 

9.5

 

53.7

 

 

 

 

6.3

 

57.2

East

 

 

 

15.8

 

70.5

Verde

 

Mixed

 

9.5

 

73.6

 

 

 

 

6.3

 

79.3

East

 

 

 

 

 

 

Verde

 

Oxide

 

9.5

 

77.0

Pancho

 

Sulphide

 

9.5

 

71.6

Pancho

 

Mixed

 

9.5

 

79.8

Pancho

 

Oxide

 

9.5

 

89.0

 

Figure 16-1: Metallurgical Sample Locations – Verde Pit – 4300 Level

 

 

 

63



 

Figure 16-2: Metallurgical Sample Locations – Pancho Pit – 4300 Level

 

 

16.1.4       Bond Work Index

 

Bond Work Index (BWI) samples were collected from the 10, HQ diameter core holes drilled at Verde. Bond work index tests required selection of whole HQ core pieces of approximate length of 0.15 – 0.20 meters.  For Verde, such pieces were selected every 4 meters down-hole.  All ten Verde HQ diameter holes were sampled in this manner, a total of 296 samples. At Pancho, BWI samples were collected from the standard diameter drill holes. Whole core pieces were taken approximately every 20 meters down hole.  A total of 67 samples were selected. All samples were shipped to Hazen Research, Colorado, for analysis.

 

Results of the BWI tests indicated limited variability in the rock mass therefore; the BWI data was not modeled when completing the Verde and Pancho resource models.

 

64



 

16.1.5       Specific Gravity

 

As part of the BWI tests above, Hazen completed specific gravity analyses on all the BWI samples submitted. In addition to this data, 1171 samples of half core were selected from the half core library. Samples, roughly 15 cm in length, were selected approximately every 30 meters downhole throughout the entire campaign. The samples were shipped to ACME laboratories, Santiago where they were analysed using the wax dipped immersion method.  A summary of the specific gravity results is presented in Table 16-5.

 

Table 16-5: Specific Gravity Results

 

Deposit

 

Unit

 

SG

Verde

 

Oxide

 

2.45

 

 

Mixed

 

2.52

 

 

Sulphide

 

2.57

 

 

Laguna Tuff

 

2.00

 

 

Post Mineral Intrusive

 

2.60

 

 

Waste Dump Material

 

2.00

Pancho

 

Oxide

 

2.27

 

 

Mixed

 

2.38

 

 

Sulphide

 

2.49

 

Both Pancho and Verde exhibit trends of increasing Specific Gravity with depth, leading to the decision to model the deposit Specific Gravity by the oxidation surface rather than by rock type.

 

16.1.6       Acid Rock Drainage Study

 

At the request of the CMM environmental department (Jorge Herrera), ALS Chemex La Serena sent 71 pulp samples to ALS environmental laboratories Santiago for acid based accounting testwork. A subset of 40 of these was proposed for testwork.   The forty samples selected were from widely spaced locations in the anticipated pit designs for both Verdes and Pancho.  Samples included both ore and waste in major rock types in all redox zones.

 

In 2007, follow up work included a sample collection program comprising 150 samples. To date partial results are available for 140 samples. Representative samples will be selected for further wet cell analysis work once the dataset is complete.

 

65



 

16.2           Metallurgical Test Work 2006

 

16.2.1       Introduction

 

Gold recovery rates for the Verde and Pancho deposits have been estimated from test work conducted at McClelland Laboratories in Reno, Nevada.  In 2003, a total of 9 column leach tests were done on 7 Pancho composite samples and 11 column leach tests were done on 11 Verde composite samples.  In 2006, an exploration drill program on the Pancho property provided samples for an additional 14 column leach tests at McClelland.  Final test data was available by August 2007 and these gold recoveries have been integrated in the Pancho reserve estimate.

 

16.2.2        Comments on Historical Metallurgical Composite Selection Criteria

 

The early work on Maricunga metallurgical type classification established that the most predominant metallurgical criteria were grade, oxide state and crush size.  The 1998 metallurgical column testing relied on the classification of four groups of sample types largely predicated by the amount of sheeted and stockwork veining as well as silicification. The four groups are outlined below.

 

·                                          Group 1 – 81.4% recovery – Strong sheeted veining, moderate strong stockwork, and weak matrix silicification.

 

·                                          Group 2 – 72.9% recovery – Moderate-strong sheeted veining, moderate stockwork, weak matrix silicification.

 

·                                          Group 3 – 66.1% recovery – Weak-moderate sheeted veining, weak stockwork, and weak to moderate matrix silicification.

 

·                                          Group 4 – 50.4% recovery – Weak-nil sheeted veining, weak-nil stockwork, and moderate strong silicification.

 

These groupings were specific to Verde, where East Verde was predominantly represented by Group 2, while West Verde was mostly comprised of Group 3.

 

In 2003, the methodology for metallurgical sample selection was changed.  Of concern was the issue that the head grades of the group 1 to 4 samples were 20 to 40% above average grade of the deposit and it was suspected that higher grade column samples would result in higher gold recoveries.  In addition, field geologists had concerns with the classification of

 

66



 

silicification and the ability to differentiate between stockwork versus sheeted veining in chips from the predominantly RC based database.

 

As a result of the assessment of the Maricunga database and regression results and historic results, it was proposed to classify metallurgical column test samples, firstly by oxidation intensity, then by grade, and by elevation where appropriate. Due to questions of database suitability and analysis, a lower priority was given to veining, silicification, argillic alteration and lithology.

 

In 2003, before the final composites were selected for column tests, McClelland Laboratories in Reno completed bottle roll tests on 14 Pancho “point samples” selected to represent the likely metallurgical domains. Samples were differentiated by grade, lithology and oxidation state and subjected to a 96 hour bottle roll leach at a crush size of 80% passing 1.7 mm.  The results showed that the oxidation state is the only reliable predictor of heap leach gold recovery.  Head grade and lithology do not significantly affect gold recovery.  This correlation was borne out in the column tests and the current Pancho mine plan uses gold recovery values based only on oxide, mixed and sulphide ore designations.

 

16.2.3       Metallurgical Composite Selection Criteria (2006)

 

In 2006, an extensive drill campaign was completed on the Pancho deposit and drill core composite samples were shipped to McClelland Laboratories in Reno for metallurgical test work. The first stage of test work was to complete seven column tests on Pancho drill core composite samples crushed to 80% passing 6.3 mm.  The objective was to test the variability of gold recoveries from ore in zones of the Pancho pit that had not been tested previously.  Composites were selected from single holes where possible to maintain the spatial integrity of the sample. The McClelland columns were 6” diameter x 10’ tall and held 68 kg of rock. The column tests were run at a crush size of 80% passing 6.3 mm in order to be compatible with the previous test work completed on the Verde deposit.

 

The second stage of test work was to select a typical sulphide sample and a typical oxide sample from a multi-hole composite and conduct a crush size variability study to determine the effect of particle size on gold recovery.  Crush sizes of 6.3 mm, 10mm and 16 mm were selected. The oxide column leach tests have only just begun and no data is available yet. In

 

67



 

addition to the column test work, bottle roll cyanide leach tests were conducted on multiple point samples to determine the variability of gold recovery and copper recovery.

 

The metallurgical composite selection criteria was to obtain lithotypes with representative oxidation and hypogene alteration combined with representative Au and Cu grades in spatially well distributed areas within the original Pancho $450/Au oz pit.  The sample summary table below present the details for 2006 Pancho metallurgical composites (see Table 16-7).

 

Table 16-6: Pancho Metallurgical Composites 2006

 

Column

 

Sample

 

 

 

From

 

To

 

Au

 

Cu

 

%

 

 

 

 

 

 

 

 

Test No.

 

Ref. No.

 

Hole

 

m

 

m

 

g/t

 

ppm

 

Oxidized

 

Lithology

 

Hypo Alt str-wk

 

% py

 

% veins

P1

 

1

 

P2-1930

 

350

 

474

 

0.96

 

239

 

0

 

Porphyry

 

chl ser pot

 

1-5

 

0.5 - 1

P2

 

2

 

P2-2240

 

180

 

288

 

0.5

 

548

 

5

 

Breccia

 

pot,chl.ser

 

0.5-2

 

0.5 - 1

P3

 

3

 

P9.5-1690

 

40

 

104

 

0.71

 

698

 

5

 

Porphyry

 

chl ser pot

 

1-2

 

0.5

P4

 

4

 

P7-2140

 

80

 

160

 

0.62

 

1366

 

10

 

Porph./Breccia

 

clay,ser,chl

 

1-3

 

0.5 - 1

P5

 

5

 

P9.5-1840

 

80

 

150

 

0.58

 

755

 

2

 

Porphyry

 

pot, chl

 

0.5

 

0.5 - 1

P7

 

6a

 

P7-2140

 

10

 

50

 

0.57

 

103

 

100

 

Breccia

 

arg,jar

 

0.5

 

1-3

P7

 

6b

 

P10.5-2090

 

10

 

44

 

0.64

 

50

 

100

 

Porphyry

 

arg,jar,pot

 

0.5

 

0.5

P6

 

6

 

P9.5-1840

 

3

 

70

 

0.82

 

1166

 

50

 

Porphyry

 

chl pot arg

 

1-1.5

 

0.5-1

P8

 

8

 

P8-2175

 

140

 

248

 

0.63

 

1322

 

3

 

Fine Gr. Porph.

 

ser chl

 

0.5-5

 

0.5 - 2

P9

 

9

 

P4.5-1730

 

380

 

490

 

0.72

 

1041

 

0

 

Porphyry

 

chl sil

 

0.5

 

0.5-1

P10

 

10

 

P5.5-2000

 

290

 

400

 

0.63

 

504

 

0

 

Porphyry

 

pot chl ser

 

0.5

 

0.5

P11

 

11

 

P7-2020

 

300

 

390

 

0.59

 

1264

 

100

 

Porphyry

 

chl ser pot

 

0.2

 

1-2

P12

 

12

 

P5.5-2100

 

400

 

500

 

0.57

 

738

 

100

 

Porphyry

 

chl sil

 

0.5

 

0.5-1.5

P13

 

13

 

P3.2-1770

 

350

 

450

 

0.52

 

256

 

100

 

Porphyry

 

chl ser pot

 

0.2-1

 

0.2

P14

 

14

 

P4.5-1990

 

300

 

400

 

0.79

 

455

 

0

 

Porphyry

 

qtz-ser-chl

 

0.2-1

 

0.2

 

16.2.4       McClelland Test Work Summary

 

A total of 13 drill core composites and 43 drill cuttings composites were prepared for heap leach cyanidation testing. Another composite was collected at a later date and was selected for its high copper content. Detailed head analyses and direct agitated cyanidation (bottle roll) tests were conducted on all of the composites. The cuttings composites were evaluated at a nominal 1.7 mm (as-received) feed size. The drill core composites were evaluated at 80% -1.7mm and 80% -75mm feed sizes. Select (3) drill core composites were also evaluated at an 80%-6.3mm feed size. A column percolation leach test was conducted on 10 of the 13 drill core composites, at an 80% -6.3mm feed size. Select (2) drill core composites

 

68



 

were also subjected to column leach testing at 80% -15.9mm and 9.5mm feed sizes. Metallurgical results from this testing program are summarized below.

 

The composites evaluated were representative of the various ore types from the Pancho deposit. Head analysis results showed that the cuttings composites contained between 0.35 and 2.54 gAu/mt ore. The drill core composites contained between 0.44 and 0.95 gAu/mt ore. Total copper content of all of the composites ranged from <0.01 to 0.2% Cu. On average, acid soluble copper and cyanide soluble copper represented 17% and 63%, respectively, of the total contained copper.

 

The Pancho drill cuttings and core composites generally were amenable to direct agitated cyanidation treatment at an 80%-1.7mm feed size. Gold recoveries from the cuttings composites ranged from 43.5% to 97.4%, and averaged 73.0%. Gold recoveries of less than 60% were obtained from only 4 of the 43 cuttings composites. Gold recoveries obtained from the drill core composites at an 80%-1.7mm feed size ranged from 52.9% to 88.6%, and averaged 74.2%.

 

The 2140 composite was the only drill core composite exhibiting a gold recovery of less than 60%. Grinding of the drill core composites to 80% -75mm improved the average gold recovery to 83.2%. Bottle roll test cyanide consumptions varied substantially, and tended to increase with increasing copper head grade. Cyanide consumption for the 1.7mm feeds ranged from 0.11 to 3.67 kg NaCN/mt ore, and averaged 1.00 kg NaCN/mt ore. Lime requirements varied substantially, and were very high (>10 kg/mt ore) for seven of the composites tested. Overall, 1.7mm feed bottle test lime requirements ranged from 2.2 to 61.9 kg/mt ore, and averaged 7.3 kg/mt ore.

 

The 10 drill core composites subjected to column leach testing were amenable to simulated heap leach cyanidation treatment, at the feed sizes evaluated. All 10 composites were evaluated at an 80% -6.3mm feed size. Gold recoveries obtained from the 6.3mm feeds ranged from 55.1% to 89.1%, and averaged 72.0%, in from 71 to 174 days of leaching. Gold recoveries of lower than 70% were obtained from the 1840 composite (62.3%), the 2140 composite (56.5%) and the Copper Column Test (CCT) composite (55.1%).

 

The Maricunga-High Elevation Variable Crush (RHEVC) and Oxide core composites were both also subjected to column testing at 80% -15.9mm and 80% -9.5mm feed sizes, to

 

69



 

evaluate crush size sensitivity of the Pancho ore. Gold recovery increased incrementally (3% - 6%), by crushing from 15.9mm to 9.5mm in size. Gold recoveries obtained from both composites were essentially the same at the 9.5mm and 6.3mm feed sizes.

 

Column test gold recovery rates for the 2240, Pancho 6, CCT and Oxide composites were rapid, and gold extraction was substantially complete in about 25 days of leaching. Gold recovery rates were slower, and gold extraction progressed at a slow, but significant rate after 75 days of leaching, for the 1690, 1840, 1930 and 2140 composites. The slowest gold recovery rates observed were for the 1840 Shallow and RHEVC composites.

 

Column test cyanide consumptions generally were high, but were not as strongly correlated to copper head grade, as seen during bottle roll testing. Column test cyanide consumptions tended to increase with increasing leach solution application, as normally expected for column leach tests. Because some of the column test leach cycles were relatively long in duration (>140 days), the resulting cyanide consumptions were relatively high. Average column test cyanide consumption (6.3mm feeds) was 2.39 kg NaCN/mt ore.

 

Column test lime additions were made based on corresponding bottle roll test lime requirement data. Lime requirements for the drill core composites varied substantially. Initial column test lime additions ranged from 1.8 to 13.0 kg/mt ore. Those lime additions were sufficient for maintaining protective alkalinity during leaching, for most of the composites. Minor pH control problems were encountered during leaching of the 2140 and 2240 composites, and relatively small lime additions were made to the column test barren solutions during leaching, to help control leaching pH. Severe pH control problems were encountered during leaching of the Oxide and CCT composites, and the lime added during leaching for pH control was equivalent to more than the lime added to the ore initially. The highest observed combined lime requirement was 41.1 kg/mt ore, for the Oxide composite 9.5mm column feed. Higher initial lime additions should be evaluated for these ore types to determine whether or not pH control will be a problem during commercial heap leaching.

 

Overall, reagent consumption data indicate potential concerns during commercial heap leaching of the Pancho ore, with respect to high cyanide consumptions related to copper dissolution, and high lime consumptions related possibly to interaction with sulphates naturally occurring in the ore. Follow-up testing was recommended to better establish base requirements for pH control during heap leaching of the higher lime consuming Pancho ores.

 

70



 

Table 16-7: Pancho and Verde Gold Recovery Estimates

 

Gold Recovery (%)

 

Deposit

 

Zone

 

2003
Column
Test Data

 

SNC Study

 

2004
 $350/oz
Pit Design

 

2005
$400/oz
Pit Design

 

2006
$475/oz Pit
Design

 

2006-2007
Final
Column
Tests

 

 

 

Oxide

 

77

 

73

 

67

 

73

 

73

 

 

 

Verde

 

Mixed

 

74

 

70

 

67

 

70

 

70

 

 

 

 

 

Sulphide

 

54

 

53

 

48

 

53

 

53

 

 

 

 

 

Oxide

 

89

 

80

 

80

 

85

 

85

 

86

 

Pancho

 

Mixed

 

80

 

75

 

75

 

75

 

75

 

77

 

 

 

Sulphide

 

72

 

70

 

70

 

70

 

70

 

70

 

 

Pancho Column Test Work Results

 

Prior to conducting the column leach tests, bottle roll cyanide leach tests were conducted on the samples to confirm metallurgical response and estimate reagent consumptions.  The data is summarized in Table 16-8.  Gold recoveries and reagent consumption rates were similar to those established in the 2003 testwork. It is clear that cyanide consumption increases with copper content and lime consumption increases with oxidation state.  Gold recovery also increases with oxidation state.  It is also clear that gold recovery increases with a finer grind confirming that recovery is sensitive to crush size.

 

The column leach test data is summarized in Table 16-9 and charts of gold and copper extraction versus time are appended.  The data compiled to date indicates that gold recovery from the Pancho samples tested in 2006-2007 is in the region of 69% for the sulphide ore and 86% for the oxide ore.  This test work (Table 16-9) plus the work completed in 2003 confirms that the gold recovery values used in the 2007 reserve estimate are reasonable (68% for sulphide, 75% for mixed and 85% for oxide).

 

71



 

Table 16-8: Pancho Bottle Roll Summary 2006

 

 

 

 

 

 

 

1.7 mm crush, 96 hr bottle roll

 

 

 

 

 

 

 

Calculated

 

Gold

 

Calculated

 

Copper

 

Cyanide

 

Lime

 

Sample

 

%

 

 

 

Head

 

Recovery

 

Head

 

Recovery

 

Consumption

 

Consumption

 

Number

 

Oxidized

 

Lithology

 

Au g/t

 

%

 

Cu ppm

 

%

 

kg/mt ore

 

kg/mt ore

 

P1

 

0

 

Porph.

 

1.04

 

70

 

248

 

19

 

0.45

 

2.2

 

P2

 

5

 

Bx.

 

0.47

 

79

 

429

 

53

 

1.13

 

6.1

 

P3

 

5

 

Porph.

 

0.70

 

70

 

631

 

37

 

0.98

 

3.7

 

P4

 

10

 

Porph./Bx.

 

0.70

 

53

 

1,225

 

51

 

2.20

 

2.6

 

P5

 

2

 

Porph.

 

0.55

 

62

 

769

 

22

 

0.92

 

2.4

 

P6

 

50

 

Porph.

 

0.80

 

73

 

1,076

 

54

 

1.81

 

7.1

 

P7

 

100

 

Porph./Bx.

 

0.64

 

88

 

111

 

10

 

0.18

 

7.0

 

P8

 

0

 

Porph./Bx.

 

0.73

 

64

 

765

 

22

 

0.83

 

3.2

 

 

 

 

 

 

 

 

75 micron grind, 72 hr bottle roll

 

 

 

 

 

 

 

Calculated

 

Gold

 

Calculated

 

Copper

 

Cyanide

 

Lime

 

Sample

 

%

 

 

 

Head

 

Recovery

 

Head

 

Recovery

 

Consumption

 

Consumption

 

Number

 

Oxidized

 

Lithology

 

Au g/t

 

%

 

Cu ppm

 

%

 

kg/mt ore

 

kg/mt ore

 

P1

 

0

 

Porph.

 

1.04

 

87

 

364

 

18

 

0.37

 

2.0

 

P2

 

5

 

Bx.

 

0.54

 

80

 

438

 

54

 

1.13

 

4.9

 

P3

 

5

 

Porph.

 

0.67

 

84

 

675

 

41

 

1.46

 

2.9

 

P4

 

10

 

Porph./Bx.

 

0.67

 

64

 

1,102

 

46

 

1.96

 

2.3

 

P5

 

2

 

Porph.

 

0.59

 

83

 

752

 

20

 

0.67

 

2.4

 

P6

 

50

 

Porph.

 

0.81

 

83

 

1,064

 

62

 

2.09

 

6.2

 

P7

 

100

 

Porph./Bx.

 

0.65

 

89

 

116

 

14

 

0.37

 

5.8

 

P8

 

0

 

Porph./Bx.

 

0.74

 

84

 

742

 

19

 

0.61

 

2.7

 

 

Table 16-9: Pancho Column Test Summary 2007 (Part 1)

 

Column
Test
No.

 

Composite

 

Oxidized

 

Lithological
Type

 

Feed
Size
P
80 (mm)

 

Leach/Rinse
Time,
days

 

Au Rec.
%

 

P1

 

1930

 

0

 

Porphyry Sulphide

 

6.3

 

169

 

78.8

 

P2

 

2240

 

5

 

Breccia Sulphide

 

6.3

 

108

 

71.1

 

P3

 

1690

 

5

 

Porphyry Sulphide

 

6.3

 

223

 

77.6

 

P4

 

2140

 

10

 

Porphyry Sulphide

 

6.3

 

193

 

56.5

 

P5

 

P95-1840

 

2

 

Porphyry Sulphide

 

6.3

 

175

 

62.3

 

P6

 

Shallow Comp P95-1840

 

50

 

Mixed Sulphide

 

6.3

 

210

 

76.6

 

P7

 

Pancho 6a+6b Comp

 

100

 

Oxide

 

6.3

 

84

 

89.1

 

P8

 

RHEVC

 

0

 

Porphyry Sulphide

 

15.9

 

167

 

61.3

 

P9

 

RHEVC

 

0

 

Porphyry Sulphide

 

9.5

 

167

 

67.2

 

P10

 

RHEVC

 

0

 

Porphyry Sulphide

 

6.3

 

167

 

68.8

 

P11

 

Oxide

 

100

 

Oxide

 

15.9

 

81

 

82.1

 

P12

 

Oxide

 

100

 

Oxide

 

9.5

 

81

 

84.8

 

P13

 

Oxide

 

100

 

Oxide

 

6.3

 

81

 

84.1

 

P14

 

Copper Column Test

 

5

 

Porphyry Sulphide

 

6.3

 

81

 

55.1

 

 

72



 

Table 16-10: Pancho Column Test Summary 2007 (Part 2)

 

Column

 

 

 

 

 

 

 

 

 

 

 

 

 

NaCN

 

Test

 

 

 

gAu/mt ore

 

gCu/mt ore

 

Consumed,

 

No.

 

Composite

 

Extracted

 

Tail Screen

 

Avg. Head

 

Extracted

 

Head Assay

 

kg/mt ore

 

P1

 

1930

 

0.78

 

0.21

 

0.99

 

60

 

300

 

2.03

 

P2

 

2240

 

0.32

 

0.13

 

0.47

 

173

 

600

 

2.49

 

P3

 

1690

 

0.52

 

0.15

 

0.7

 

173

 

800

 

2.82

 

P4

 

2140

 

0.39

 

0.3

 

0.69

 

539

 

1400

 

3.71

 

P5

 

P95-1840

 

0.33

 

0.2

 

0.5

 

104

 

1200

 

2.12

 

P6

 

Shallow Comp P95-1840

 

0.59

 

0.18

 

0.79

 

600

 

770

 

3.46

 

P7

 

Pancho 6a+6b Comp

 

0.57

 

0.07

 

0.62

 

27

 

100

 

1.18

 

P8

 

RHEVC

 

0.38

 

0.24

 

0.68

 

162

 

800

 

2.19

 

P9

 

RHEVC

 

0.43

 

0.21

 

0.68

 

178

 

800

 

2.55

 

P10

 

RHEVC

 

0.44

 

0.2

 

0.68

 

144

 

800

 

2.37

 

P11

 

Oxide

 

0.55

 

0.12

 

0.67

 

22

 

200

 

2.17

 

P12

 

Oxide

 

0.56

 

0.1

 

0.67

 

38

 

200

 

2.23

 

P13

 

Oxide

 

0.53

 

0.1

 

0.67

 

16

 

200

 

2.16

 

P14

 

Copper Column Test

 

0.38

 

0.31

 

0.75

 

133

 

1300

 

1.52

 

 

16.2.5     SART Process Feasibility Study

 

Uneconomic concentrations of copper are present in the heap leach ore at the Maricunga mine. Some of the copper minerals are soluble in cyanide solutions and these minerals consume cyanide reagent and contaminate the leach solution with copper metal.  Unless removed, this copper will decrease the purity of the dore bars and incur penalty refining costs. The copper grade in the leach solution has risen significantly from initial levels of below 50 ppm in 2005 to over 300 ppm in 2007. This copper concentration is expected to increase further as ores from the Pancho deposit are processed. The rising copper level in the Maricunga heap leach solution will need to be addressed to avoid increased lock-up of cyanide by the copper resulting in increased operating costs.

 

Over the last two years, Kinross has undertaken significant metallurgical testwork and engineering studies to establish a robust process for removing copper from the circuit and recycling the cyanide.  In 2005, SGS Lakefield completed preliminary tests confirming that SART technology had the best potential.  The SART process was developed in 1997 by SGS Lakefield Research and Teck Corporation and is currently in full-scale commercial application at Newcrest’s Telfer Mine in Australia.

 

73



 

The SART name is derived from an acronym describing the unit operations in the process, as follows:

 

·                                          Sulphidization

 

·                                          Acidification

 

·                                          Recycling of precipitate/s

 

·                                          Thickening of precipitate/s

 

The SART process flowsheet is shown schematically below in Figure 16-3.

 

Figure 16-3: SART Plant Flowsheet

SART, as originally developed, involves adding chemical sulphide ions, such as sodium hydro-sulphide (NaSH), to an acidified CN solution (pH 10 to pH 5 or below) to precipitate copper, silver and zinc (if present) as metal sulphides and convert cyanide to HCN, under weakly acidic conditions. Other CN solubilized metals like Ni and Co would also be precipitated. HCN is a very soluble gas, and remains in solution until the Cu2S, Ag2S or ZnS

 

74



 

is removed by thickening and filtration. The HCN solution is then neutralized with lime or caustic soda, prior to recycling to leach.

 

The overall chemical reactions applied to Cu, Zn and Ag cyanide complexes are:

 

2Cu(CN)32-  +  S2-  +  6H+   à   Cu2S  +  6HCN

 

2Ag(CN)2-   +  S2-  +  4H+  à   Ag2S  +  4HCN

 

Zn(CN)42-   +  S2-  +  4H+  à   ZnS  +  4HCN

 

The above sulphidization reactions occur rapidly in a first stage (primary) precipitation reactor from which sulphide precipitates are fed to a thickener. Recycle of thickened slurry of sulphide precipitates back to the reactor is done until a suitable precipitate particle size develops and sufficient bed depth in the thickener is achieved. A precipitate slurry of 10 – 15% solids may then be drawn off the thickener underflow and washed, filtered and dried. The Cu2S precipitate (with Zn, Ni and other metal sulphides, if present) is then sold to a smelter as a valuable co-product.

 

A second reactor is used to neutralize the aqueous HCN in the thickener overflow from pH 5 back to pH 10. Lime or caustic soda may be used to produce CaCN2 or NaCN for recycle to the heap or tank leaching circuit. The neutralization reactions are:

 

2HCN  +  Ca(OH) 2  à  CaCN2  +  H2O

 

2HCN  +  NaOH      à  NaCN  +  H2O

 

All three process units (2 reactors and a thickener) are sealed and have vents to a lime scrubber system to capture any evolved HCN or H2S gases. By acidifying with sulphuric acid in the primary reactor, the SART process leads to formation of a gypsum type precipitate on neutralization of HCN in the neutralization reactor. This gypsum precipitate needs to be removed from the neutralized CN solution prior to recovery of gold on carbon and recycle of barren CN solution to the leach circuit. To achieve this, a gypsum thickener is included in the circuit with the option of recycling the gypsum thickener underflow to enhance precipitation rates and settling / consolidation in the thickener.

 

The SART process may be applied to pregnant gold solutions prior to carbon adsorption or on barren solutions after carbon adsorption. For a heap leach operation the inherent leach

 

75



 

solution / ore solids separation suits the SART process as clear solutions are fed directly to the primary precipitation reactor. For mill plants the leach slurry may be washed via CCD with the overflow pregnant solution feeding a SART plant prior to carbon adsorption. When the leach slurry feeds a CIP plant, the CIP tails (barren) may be washed in a CCD circuit and then fed to a SART plant.

 

In summary, the process involves lowering the solution pH to release the cyanide associated with the copper cyanide complex, allowing it to be recycled back to the leach process as free cyanide.  Sulphide reagent is added to the acidic solution to precipitate the copper as a solid high-grade copper sulphide precipitate which can be filtered, dried, bagged and shipped to a smelter to generate copper revenue.  Lime has to be added back into the solution to neutralize the acid and gypsum (calcium sulphate) will be formed as by-product.  This gypsum will be stored in lined ponds.

 

The location of the SART plant was chosen to be near the existing ADR plant at the base of the heaps in order to maximize the use of existing roads and services.  A SART plant of 750 m3/hr capacity was determined as optimal to treat a bleed stream from the leach solution (2,150 m3/hr) from the heaps.  In this way, the capital outlay for the plant is minimized and the SART plant can be taken off line without affecting gold production. A copper sulphide precipitate (Cu2S at about 65% Cu) will be produced at a rate of approximately 5 to 10 tonnes per day and is planned to be sold to the Enami smelter near Copiapo. Figure 16-4 shows the Marigunga modified flowsheet incorporating the SART process.

 

A process to apply for environmental permitting has begun with preparation of DIA documents leading to a construction permit. This feasibility study has mapped out the DIA application process steps and contains the process technical information that will be required for the application documentation. The installation of a SART plant at Maricunga will involve some changes to the existing operation and a DIA permit will be required. Main changes to the Maricunga operation are: supply of sulphuric acid (about 15 t/day) and NaSH chemicals to the mine, dispatch of copper sulphide precipitate (about 5 t/day) from the mine and disposal of a gypsum product on site in a lined facility at the mine (about 20 t/day). A new EIS for Maricunga will not be required for the plant. The estimated timing for the permitting process following submission of the DIA is expected to be about 8 months and will not be on the project critical path.

 

76



 

Figure 16-4: Modified Maricunga Plant Flowsheet with SART

 

 

77



 

17.0        MINERAL RESOURCE AND MINERAL RESERVE ESTIMATE

 

17.1        Introduction

 

The Mineral Resource and Reserve Estimates for the Maricunga Project have been prepared under the direct supervision of Maryse Bélanger, P. Geo., Director Technical Services, Kinross Americas.

 

During the course of 2007, a full review of the geologic interpretation and the spatial controls of mineralization was undertaken for both Verde and Pancho resulting in new resource models to support updated Mineral Resource and Mineral Reserve estimates.

 

17.2        Interpretation and Grade Domains

 

17.2.1     Verde

 

The gold grade model for Verde used to rely on a lithological interpretation completed by the site geologists to discriminate between mineralized and barren lithologic units. Mining experience at Verde has shown that the mineralization tends to cross over all lithologies.

 

The Verde model update prepared in 2007 incorporates a new interpretation based on a better understanding of the geology and the mineralization and its spatial distribution. Essentially, mining has shown that the gold content of the material mined is often related to its position relative to the known post-mineral intrusive bodies at Verde East and Verde West.

 

The model update is based on the new interpretation for Verde East and Verde West.  The concept and resulting geometry are the same for both open-pit areas.  The mineralization and its inner limits are defined within a zone of high-grade material centred about a post-mineral intrusive. The proximity to the post-mineral intrusive is what affects most the overall grade distribution.

 

 The halo surrounding the higher-grade core is slightly more diffuse and incorporates mineralization of lesser tenor.  The overall concept also concurs with observations in the mining areas where the material closer to the PMI displays stronger brecciation and more

 

78



 

veinlets often resulting in grades exceeding 1 g/t Au.  This compares to grades of 0.5 g/t to 0.6 g/t for the rocks located at greater distances and then again decreasing as distances from the PMI become greater.  Finally, an external zone of low grade material was modelled broadly based on a cut-off of 0.15 g/t Au.  A typical plan view is presented below in Figure 17 -1.

 

Figure 17-1: Typical Plan View of Verde Domaining (Bench 4280)

 

 

The domains model developed from cross sectional and level plan interpretation, identified distinct zone boundaries that are used as soft boundaries during grade interpolation as per the conclusions drawn for the contact profiles (see Section 17.4.2.1).

 

The Figure above shows the peripheral zone of approx. 0.15 g/t Au, the low-grade mineralization (in green) defined as the material with a gold grade between 0.3 g/t and 0.6 g/t. The high-grade (in red) encompasses the material greater than 0.6 g/t Au. Throughout this report they are referred to as:

 

·                                          Domain 1 = gold grade greater than 0.6 g/t

 

·                                          Domain 2 = gold grade between 0.3 g/t and 0.6 g/t

 

·                                          Domain 3 = low grade at the periphery based on 0.15 g/t

 

79



 

The new interpretation incorporates outlines digitized first from sections and then transposed on plans in order to get the best possible representation of the mineralization in three-dimensions. The outlines were than linked to form solids that were validated in Vulcan.  Blast hole plans were also used to guide the interpretation as they provide close-spaced information.

 

17.2.2     Pancho

 

The model for Pancho is based on the core samples collected in 2006. Diamond drilling demonstrated that the mineralization crosses over all lithologies and appears centred on a Post-Mineral Intrusive that is in rare instances mineralised. A model similar to Verde was created where three domains were defined.  First, 9 sections oriented N40°W were plotted and interpreted with the outlines digitized in Vulcan. Then, 47 plans at 10 m intervals encompassing elevations from 4440 m to 3700 m elevation were interpreted. The outlines obtained in plan and section views were connected to form the solids defining the grade domains. They are also referred to as Domain 1, Domain 2 and Domain 3 corresponding to grade ranges similar to those used at Verde.

 

·                                          Domain 1 = gold grade greater than 0.6 g/t

 

·                                          Domain 2 = gold grade between 0.3 g/t and 0.6 g/t

 

·                                          Domain 3 = low grade at the periphery based on 0.15 g/t

 

The northwest quadrant of the Pancho deposit shows significant copper content related to the presence of a small chalcocite blanket close to the surface and hypogene porphyry copper mineralization in the form of chalcopyrite at greater depths. A copper domain was interpreted on sections and plans as per the methodology used in defining the gold grade domains. The copper domain of interest is generally located between 4320m and 3840m elevation. The copper grades shown on plans and sections demonstrate that a 200 ppm cyanide soluble copper grade form a continuous domain in three-dimensions. It was therefore the criteria chosen for defining two domains and coding the block accordingly:

 

·                                          Domain 0 = outside the copper envelope defined by 200 ppm cyanide soluble copper

 

·                                          Domain 1 = inside the copper envelope

 

80



 

17.3                        Oxidation Model and Recovery

 

Metallurgical recovery is a key aspect in modelling the Verde and Pancho deposits. Significant effort was directed towards establishing a relationship between metallurgical recovery and the level of oxidation visually estimated by the site geologists. Table 17-1 shows the criteria used in defining the material types encountered in the pit.

 

Table 17-1: Oxidation Codes

 

Material

 

 

Condition

 

Code

Oxide

 

greater than 50%
oxidation

 

Block Code Redox = 3

Mixed

 

between 10%
and 50%
oxidation

 

Block Code Redox = 2

Sulphide

 

less than10%
oxidation

 

Block Code Redox = 1

 

The original recovery model was developed by interpretation of cross section, longitudinal section and level plan data by the site geologists. The more recent recovery model for Verde integrates all blast hole and mine geology information collected to date. The interpreted surfaces were used as hard boundaries for assigning recoveries in the blocks during pit optimization. The surfaces are highly irregular and similar to the undulations observed in the pit walls at Verde.

 

The additional core samples available for Pancho allowed for an update of the surfaces marking the different levels of oxidation, namely oxide, mixed and sulphide. One noticeable difference is that the new interpretation includes less mixed material than indicated by the original interpretation completed in 2003.

 

17.4                        Grade Model

 

17.4.1              Statistical and Geostatistical Analyses

 

Excluded Data

 

The following data was not used in completing the original resource block model for Verde:

 

81



 

·                                          blast hole data

 

·                                          trench data and;

 

·                                          drill data within the previously mined portion of the Verde pits.

 

For Pancho some historical data was also excluded. They included trench data and original Anglo American drill holes for which location could not be confirmed. These were part of hole series SHR and SDR.

 

Unexplained missing data was assigned a zero value for all analyses. Explained missing data was treated as missing data and ignored during processing.

 

Statistics

 

Basics statistics were calculated for the original 2 m gold assays. The results for Verde and Pancho gold assays are presented in Table 17-2 and Table 17-3 below.

 

Table 17-2: Statistics for Uncapped 2 m Gold Assays - Verde

 

 

 

 

 

Mean Au

 

 

 

Coef. of

 

 

 

 

 

Zone

 

Number

 

g/t

 

Std. Dev.

 

Variation

 

Minimum

 

Maximum

 

All

 

49,789

 

0.67

 

0.69

 

1.03

 

0

 

15.94

 

1

 

19,153

 

1.07

 

0.80

 

0.75

 

0

 

15.94

 

2

 

15,274

 

0.56

 

0.47

 

0.84

 

0

 

10.2

 

3

 

6,908

 

0.25

 

0.35

 

1.39

 

0

 

10.63

 

 

Table 17-3: Statistics for Uncapped 2 m Gold Assays - Pancho

 

 

 

 

 

Mean Au

 

 

 

Coef. of

 

 

 

 

 

Zone

 

Number

 

g/t

 

Std. Dev.

 

Variation

 

Minimum

 

Maximum

 

All

 

31,164

 

0.54

 

0.66

 

1.22

 

0

 

21.9

 

1

 

8,560

 

0.97

 

0.86

 

0.89

 

0

 

21.32

 

2

 

10,796

 

0.51

 

0.37

 

0.72

 

0

 

11.95

 

3

 

9,856

 

0.28

 

0.53

 

1.90

 

0

 

21.9

 

 

It should be noted that the coefficients of variation for gold are low reflecting the disseminated widespread nature of the mineralization.

 

82



 

17.4.2              Grade capping

 

Capping of gold values affects 0.2% of the total number of assays at Verde. Grade capping was determined based on analysis of the statistics of the three populations created by dividing into the separate grade domains. The levels chosen were 4 g/t Au in the high-grade zone (domain 1) and 2.0 g/t Au in the low-grade zone (domain 2). These capping levels correspond respectively to the 99th percentile and the 98th percentile. In the material to the periphery (domain 3) a cap of 1 g/t was selected effectively reducing the grade of approx. 2.0% of the samples

 

Similar capping levels were selected for the Pancho domains reflecting the similarity in the grade distributions. The levels chosen were also 4 g/t Au in the high-grade zone (domain 1) and 2.0 g/t Au in the low-grade zone (domain 2). These capping levels correspond to the 99th percentile in both domains. In the material to the periphery (domain 3) a cap of 1 g/t was selected effectively reducing the grade of approx. 2.5% of the samples.

 

The grade capping was used in combination with restricting the influence of the higher-grade composites. (Please see Sections 17.4.4 and 17.4.5 on Gold Grade Interpolation Verde and Gold Grade Interpolation Pancho for more details).

 

At Pancho the copper and cyanide soluble copper grades were not capped.

 

17.4.3              Sample Compositing

 

Capped assays were composited to build the resource models for Verde and Pancho. All grade interpolation was based on 5 m length composites to account for drill hole deviations.

 

Statistics for the 5 m composites using gold capped assays are presented in Tables 17-4 to 17-8. Statistics for copper and cyanide soluble copper are also presented for Pancho.

 

Table 17-4: Statistics for 5 m Gold Composites - Verde

 

 

 

 

 

Mean Au

 

 

 

Coef. of

 

 

 

 

 

Domain

 

Number

 

g/t

 

Std. Dev.

 

Variation

 

Minimum

 

Maximum

 

All

 

20,577

 

0.66

 

0.55

 

0.84

 

0

 

4.00

 

1

 

7,901

 

1.05

 

0.58

 

0.55

 

0

 

4.00

 

2

 

15,274

 

0.56

 

0.31

 

0.55

 

0

 

10.20

 

3

 

6,908

 

0.25

 

0.35

 

1.39

 

0

 

10.63

 

 

83



 

Table 17-5: Statistics for 5 m Gold Composites – Pancho

 

 

 

 

 

Mean Au

 

 

 

Coef. of

 

 

 

 

 

Domain

 

Number

 

g/t

 

Std. Dev.

 

Variation

 

Minimum

 

Maximum

 

All

 

12,578

 

0.52

 

0.45

 

0.87

 

0

 

4.00

 

1

 

3,477

 

0.94

 

0.53

 

0.56

 

0

 

4.00

 

2

 

4,330

 

0.51

 

0.27

 

0.52

 

0

 

2.00

 

3

 

4,018

 

0.27

 

0.26

 

0.97

 

0

 

1.78

 

 

Table 17-6: Statistics for 5 m Copper Composites – Pancho

 

 

 

 

 

Mean Cu

 

 

 

Coef. of

 

 

 

 

 

Domain

 

Number

 

ppm

 

Std. Dev.

 

Variation

 

Minimum

 

Maximum

 

Outside

 

9,314

 

303

 

303

 

1

 

0

 

4,254

 

Inside

 

2,592

 

1,048

 

1048

 

1

 

3

 

7,820

 

 

Table 17-7: Statistics for 5 m Cyanide Soluble Copper Composites – Pancho

 

 

 

 

 

Mean Cu

 

 

 

Coef. of

 

 

 

 

 

Domain

 

Number

 

ppm

 

Std. Dev.

 

Variation

 

Minimum

 

Maximum

 

Outside

 

7,047

 

92

 

184

 

2

 

0

 

2,410

 

Inside

 

2,088

 

469

 

469

 

1

 

3

 

4650

 

 

17.4.4              Contact Profiles

 

For the updated models, contact profiles were generated to determine cases where hard or soft boundaries should be used during grade interpolation. The graphs were examined and search strategies as described in the grade interpolation sections were adopted.

 

17.4.5              Variography

 

Directional semi-variograms, (15 degree increments horizontal, 30 degree increments vertical) were modelled for both Verde and Pancho, examining only the composited drill data below the current topographic surface

 

The variography focused on the composites for the three zones defined at Verde and Pancho. The models generally indicated isotropic, two-structure models with well defined nugget values that were less than 35% of the modelled sill value.

 

84



 

The models showed good ranges in all directions, typically in excess of 100 meters.

 

Correlograms also showed good continuity with ranges in excess of 200 m along the vertical.

 

Table 17-8: Verde Variogram Table

 

 

 

Variogram Axis

 

Axis Angles

 

 

 

 

 

 

 

 

 

 

 

Domain

 

Direction

 

(Azimuth ; Dip)

 

Nugget

 

C1

 

C2

 

Range

 

Range 2

 

Domain 1,2

 

X (strike)

 

44;-0 , 127;22

 

0.15

 

0.571

 

0.279

 

13.4

 

107.8

 

 

 

Y (dip)

 

317;89 , 32;13

 

 

 

 

 

 

 

23.5

 

148.3

 

 

 

Z (across dip)

 

134;1 , 273;65

 

 

 

 

 

 

 

9.5

 

220.8

 

Domain 3

 

X (strike)

 

174;76 , 37;1

 

0.21

 

0.545

 

0.245

 

32

 

91.7

 

 

 

Y (dip)

 

274;2 , 131;81

 

 

 

 

 

 

 

32

 

711.2

 

 

 

Z (across dip)

 

185;-14 , 126;-9

 

 

 

 

 

 

 

23.6

 

111

 

 

Table 17-9: Pancho Variogram Table

 

 

 

Variogram Axis

 

Axis Angles

 

 

 

 

 

 

 

 

 

 

 

Domain

 

Direction

 

(Azimuth ; Dip)

 

Nugget

 

C1

 

C2

 

Range

 

Range 2

 

Domain 1,2

 

X (strike)

 

64;18 , 60;-21

 

0.15

 

0.702

 

0.148

 

50.7

 

1022.3

 

 

 

Y (dip)

 

335;- 3 , 329;-3

 

 

 

 

 

 

 

45.8

 

550.4

 

 

 

Z (across dip)

 

254;72 , 52;69

 

 

 

 

 

 

 

33

 

177.8

 

Domain 3

 

X (strike)

 

72;17 , 37;12

 

0.194

 

0.639

 

0.167

 

87.2

 

406.4

 

 

 

Y (dip)

 

346;-15 , 284;62

 

 

 

 

 

 

 

35.4

 

2170.7

 

 

 

Z (across dip)

 

295;66 , 133;25

 

 

 

 

 

 

 

29.7

 

341

 

 

17.4.6              Model Framework

 

The Verde model is not rotated whereas Pancho is rotated 38° NW around the Z-axis. Both models have sufficient extent to encompass all known mineralization. The model cell size at Verde was set at 10 x 10 x 10 meters (X, Y and Z direction) while at Pancho, the model cell size was increased to 25 x 25 x 10 meters to take into account the wider spaced drilling at depth.

 

17.4.7              Gold Grade Interpolation Verde

 

The primary interpolation method for gold was ordinary kriging which used the anisotropy and ranges supported by the best variogram model for each domain. Grade interpolation was verified by inverse distance to the 2nd power and nearest neighbour interpolation. Grade interpolation in Domain 1 did not utilize octant search restrictions but used a soft boundary

 

85



 

with Domain 2 composites. A minimum number of 2 samples and maximum of 8 samples were required to estimate the grade of any block. The number of samples from one drill hole that could influence a block grade estimate was limited to four (4).

 

For Domain 2, soft boundaries were used with both Domain 1 and 3. A minimum number of 2 samples and maximum of 8 samples were required to estimate the grade of any block. The number of samples from one drill hole that could influence a block grade estimate was limited to four (4). The sphere of influence of the composites greater than 0.6 g/t Au was limited to 50 m.

 

Grade interpolation in Domain 3 utilized octant search restrictions, requiring a minimum of two octants to estimate the grade of a block. A soft boundary approach was applied using samples from both Domain 2 and Domain3. The minimum number of samples per octant was 1 with a minimum of two octants required to estimate the block grade. A minimum of 2 samples and maximum of 10 samples were required to estimate the grade of any block. The number of samples from one drill hole that could influence a block grade estimate was limited to four (4).

 

Copper grades were not modelled at Verde, as the results of the metallurgical test work originally did not indicate that copper was impacting grade recovery or operating costs. Experience has shown a build up of copper in solution going to the recovery plant.

 

17.4.8              Gold Grade Interpolation Pancho

 

The gold grade interpolation at Pancho also included kriging and inverse distance to the 2nd power but did not use octant search restrictions. Domain1 gold grade were interpolated with a soft boundary with Domain 2 samples. A minimum number of 1 samples and maximum of 8 samples were required to estimate the grade of any block. The number of samples from one drill hole was limited to four (4).

 

For Domain 2, soft boundaries were used with both Domain 1 and 3. A minimum number of 1 samples and maximum of 8 samples were required to estimate the grade of any block. The number of samples from one drill hole that could influence a block grade estimate was limited to four (4).

 

86



 

A soft boundary approach was applied using samples from both Domain 2 and Domain3. The minimum number of samples was 1 and the maximum limited to 8. The number of samples from one drill hole was a maximum of four (4).

 

Copper Interpolation Pancho

 

Analysis of the drill data indicated that cyanide soluble copper grades related to the presence of a chalcocite blanket are significant. Therefore, copper grades were interpolated into the Pancho model blocks independently of the gold grade. Kriging was also the primary estimation method. Search ellipsoid anisotropy and ranges were based on the copper variograms for the two copper domains.

 

The copper grade interpolation included kriging and inverse distance to the 2nd power but did not use octant search restrictions. Domain 0 copper grades were interpolated with a soft boundary incorporating some samples from Domain 1. A minimum number of 1 samples and maximum of 8 samples were required to estimate the grade of any block. The number of samples from one drill hole was limited to four (4).

 

The interpolation for Domain 1 blocks used a similar approach with the same minimum and maximum number of composites with the effect of a single hole being limited to 4 samples.

 

Cyanide Soluble Copper Interpolation

 

The cyanide soluble copper grade interpolation followed exactly the same methodology used for copper.

 

17.4.9              Densities

 

The densities that are in the current Verde model were originally based on average values by redox state that were determined at the time of the pre-feasibility study. Since that time, the redox surfaces have been updated with the blasthole data, so a check was completed to ensure that the average values were still reasonable.

 

The density measurements were coded with the updated redox interpretation and the statistics were compared to the values used in the previous model. Table 17-10 shows that

 

87



 

there is no significant difference and therefore the density assignment will remain the same as in previous models. In addition, a review of the data shows that there is insufficient data at this time to produce a spatial density model. Because the variation in the density values by redox code is not significant within the redox type, a mean density value is considered reasonable.

 

At Pancho the density values were coded using the newly interpreted oxidation surfaces. The statistics were calculated and compared with the previous model. It is, as in the case of Verde, considered reasonable to use a mean density value in the blocks. Table 17-11 shows the comparison between the original model and the model updated in 2007.

 

Table 17-10: Density Measurements and Oxidation Level for Verde

 

 

 

Original Values

 

 

 

2007 Checks

 

Code

 

Mean

 

Mean

 

No. Data

 

Min.

 

Max.

 

C.V.

 

Oxide

 

2.45

 

2.45

 

55

 

2.12

 

2.63

 

0.06

 

Mixed

 

2.52

 

2.53

 

219

 

2.16

 

2.69

 

0.04

 

Sulphide

 

2.57

 

2.57

 

467

 

2.10

 

2.72

 

0.03

 

 

Table 17-11: Density Measurements and Oxidation Level for Pancho

 

 

 

2003 Values

 

 

 

2007 Checks

 

Code

 

Mean

 

Mean

 

No. Data

 

Min.

 

Max.

 

C.V.

 

Oxide

 

2.27

 

2.20

 

642

 

1.38

 

2.73

 

0.09

 

Mixed

 

2.38

 

2.40

 

196

 

2.10

 

2.63

 

0.06

 

Sulphide

 

2.49

 

2.50

 

2,506

 

1.83

 

2.90

 

0.05

 

 

17.4.10       Model Checking and Verification

 

Block model verification included visual inspection of the model after grade interpolation was completed to examine if the grades were consistent with the available raw data. The model was manually reviewed in plan and section using Vulcan visualization tools. Visual inspection did not identify any errors in the model.

 

17.5                        Resource Classification

 

The mineral resource estimates for Verde and Pancho have bee prepared and classified in accordance with the Canadian Institute of Mining, Metallurgical and Petroleum’s (“CIM”)

 

88



 

Standards on Mineral Resources and Reserves, Definition and Guidelines Resources classification was based on the variogram ranges for each zone, number of holes found in the search ellipsoid and proximity of the composites to the center of the block being estimated.

 

17.5.1              Resource Classification Verde

 

The model update resulted in a better understanding of the mineralization and its controls at Verde. The following conditions had to be met for classifying the blocks in the model.

 

                                            Measured Resource – Information from three drill holes found in a 50 m search ellipsoid with the closest composite at a distance of 35 m or less.

 

                                            Indicated Resource – Data from two drill holes found within a search of 70 m with the closest composite at a maximum distance of 50 m.

 

                                            Inferred Resource – Remainder of the blocks including all the blocks located in Domain 3.

 

17.5.2              Resource Classification Pancho

 

The model is now including an epithermal upper portion that is drilled on approximately 35 m and a porphyry system drilled at depth with average drill spacing greater than 75 m in some areas. These considerations and the experience gained while mining at Verde also guided the new classification scheme used for Pancho. The following conditions had to be met for classifying the blocks in the model.

 

                                            Measured Resource – Information from three drill holes found in a 75 m search ellipsoid with the closest composite at a distance of 35 m or less.

 

                                            Indicated Resource – Data from two drill holes found within a search of 100 m with the closest composite at a maximum distance of 50 m.

 

                                            Inferred Resource – Remainder of the blocks.

 

17.6                        Mineral Resource Estimate

 

The mineral resources estimated using a $625 gold price for Verde and Pancho as of December 31, 2007 are presented in Table 17-5. Mineral resources are reported exclusively of reserves.

 

89



 

Table 17-12: Measured and Indicated Mineral Resources

 

 

 

 

 

Ore Tonnes

 

Grade

 

Gold Ounces

 

Deposit

 

Class

 

(x 1,000)

 

(Au g/t)

 

(x 1,000)

 

Verde

 

Measured

 

19,335

 

0.73

 

456

 

 

 

Indicated

 

26,987

 

0.71

 

619

 

 

 

M&I

 

46,322

 

0.72

 

1,075

 

Pancho

 

Measured

 

7,585

 

0.52

 

128

 

 

 

Indicated

 

57,549

 

0.58

 

1,071

 

 

 

M&I

 

65,134

 

0.57

 

1,198

 

Total

 

 

 

111,456

 

0.63

 

2,274

 

 

The Maricunga deposits also host an Inferred Mineral Resource of 134.71 million tonnes averaging 0.56 g/tonne Au at the same $525 US per ounce gold price. Pancho hosts 132.90 million tonnes averaging 0.56 g/tonne Au and Verde hosts 1.81 million tonnes averaging 0.66 g/tonne Au.

 

17.7                        Considerations for Reserves

 

It is Kinross policy that resource estimates for open pit mine projects are reported within optimized or designed pit shells at assumed gold prices that represent reasonable, long-term price projections. Final pit designs have been completed for both Verde and Pancho and as a result, only Proven and Probable Reserves are reported.

 

17.8                        Mineral Reserve Estimate

 

Kinross Technical Services (KTS) completed the pit optimization for defining the 2007 yearend Mineral Resource and Mineral Reserve estimates.  Mineral reserves are reported within actual pit designs while the resources are reported inside optimized pit shells. The results as of December 31, 2007 are summarized and presented in Table 17-13.

 

The Verde reserve change reflects a higher gold price in conjunction with a new resource model. The increase at Pancho is the result of modifications to the resource model, entirely revised costs as of September 30, 2007 and the application of the SART process. More details on the costs and parameters used for defining the reserves are described in the section below (Section 17.9 Pit Optimizations).

 

90


 


 

Table 17-13: Proven and Probable Mineral Reserves

 

 

 

 

 

Ore Tonnes

 

Grade

 

Gold Ounces

 

Deposit

 

Class

 

(x 1,000)

 

(Au g/t)

 

(x 1,000)

 

Verde

 

Proven

 

71,071

 

0.85

 

1,947

 

 

 

Probable

 

32,409

 

0.74

 

772

 

 

 

2P

 

103,480

 

0.82

 

2,719

 

Pancho

 

Proven

 

106,627

 

0.71

 

2,436

 

 

 

Probable

 

69,395

 

0.58

 

1,290

 

 

 

2P

 

176,022

 

0.66

 

3,726

 

Total

 

 

 

279,502

 

0.72

 

6,445

 

 

17.9                                                Pit Optimizations

 

17.9.1                                      Verde

 

The Verde block model was updated to reflect the change in topographic surface for 2007.  A Mining Cost Adjustment Factor (MCAF) was also included to take into account the increased haul distance as the pit will get deeper. The base mining cost used was $1.00 per tonne with an added $0.016 for longer ore haul to crusher and waste dump. Sustaining capital for leach pad development was also included ($0.26 per tonne).

 

Optimization parameters used in Whittle optimization software are presented in Table 17-14.

 

17.9.2                                      Pancho

 

Pancho ore has variable operating costs, gold recoveries and copper grade.  The geological block model contains attributes for copper grade, cyanide soluble grade and ore type.  A Process Cost Adjustment Factor based on cyanide soluble copper grade but considering the application of the SART process was defined to optimize the block model.  Using 2007 costs and the test work completed in the SART Feasibility Study the following formulas were derived for the different ore types.

 

Oxide Process +G&A costs = $3.752

 

Mixed and Sulphide Process +G&A costs = 3.116 + 0.0037*Cu Soluble (ppm) + 1.116 * Cu Soluble (ppm) ^ -0.112

 

91



 

Table 17-14: Optimization Parameters for Verde

 

Mining Costs

 

Unit Mining Costs

 

$

1.000

 

Mining Recovery

 

97.50

%

Mining Dilution

 

2.50

%

MCAF based on elev

 

$

0.016

 

 

Pit Slopes

 

Profile 1 (East
Verde)

 

Azimuth

 

Slope

 

 

 

 

 

 

 

 

 

10

 

44.5

 

Below 4350 m

 

65

 

49

 

 

 

155

 

52.5

 

 

 

275

 

49

 

 

Profile 2 (East
Verde)

 

Azimuth

 

Slope

 

From 4360 to 4430 m

 

70

 

44.5

 

 

 

153

 

49

 

 

Profile 3 (East
Verde)

 

Azimuth

 

Slope

 

Above 4440

 

0

 

38

 

 

 

0

 

180

 

 

Profile 4

 

Azimuth

 

Slope

 

West Verde

 

0

 

51

 

 

 

90

 

51

 

 

 

180

 

49

 

 

 

270

 

49

 

 

Process Recoveries

 

Oxide

 

Au

 

73

%

Mixed

 

Au

 

70

%

Sulphide

 

Au

 

53

%

 

Processing Costs

 

Process costs $US/t

 

$3.76

 

Gold Prices

 

$550 and $625

 

Selling costs $US/oz

 

Scaled to gold price

 

 

A Mining Cost Adjustment Factor (MCAF) was also included to take into account the increased haul distance as the pit will get deeper. The base mining cost used was $1.00 per tonne with an added $0.084 for longer ore haul to crusher and waste dump. Another $0.016 was also added per 10 m bench from 4300 m elevation to consider extra haul above or below the pit access road. Sustaining capital for leach pad development was also included ($0.26 per tonne).

 

The Pancho ore will be processed at a rate of approx. 49,000 tpd over the life of mine.  Average heap leach gold recoveries are based on test work results: 85% for oxide ore, 75%

 

92



 

for mixed ore and 69% for sulphide ore.  The assumptions for the copper recoveries incorporate the dissolution rates for the different material types. They are 71%, 92% and 60% respectively for oxide, mixed and sulphide material. These rates are used in conjunction with a 95% plant recovery resulting in final recoveries of 67% for oxides, 87% for mixed and 57% for sulphides.  Table 17-15 summarizes the optimization parameters for Pancho.

 

Table 17-15: Optimization Parameters for Pancho

 

Mining Costs

 

Unit Mining Costs

 

$

1.000

 

Mining Recovery

 

97.50%

 

Mining Dilution

 

2.50%

 

 

Pit Slopes

 

Profile 1

 

Azimuth

 

Slope

 

 

 

 

 

 

 

 

 

70

 

44.5

 

Below 4300 m

 

153

 

49

 

 

 

210

 

44.5

 

 

 

308

 

52.5

 

 

 

 

 

 

 

Profile 2

 

Azimuth

 

Slope

 

 

 

 

 

 

 

Above 4300 m

 

90

 

39

 

 

 

90

 

39

 

 

 

 

 

 

 

Process Recoveries

 

Oxide

 

Au

 

85

%

Mixed

 

Au

 

75

%

Sulphide

 

Au

 

68

%

 

Processing Costs

 

Process costs $us/t

 

Block Model PCAF

 

Gold Prices

 

$550 and $625

 

Selling costs
$US/oz

 

Scale

 

 

17.10                                         Pit Designs

 

For the 2007 reserve estimate final pit designs were prepared for the Verde pits and Pancho.  Waste dump designs and overall site layout were also updated.

 

17.10.1                               Verde

 

Verde pit design work was completed by CMM’s mine planning engineers using Vulcan mining software.  The software allows the user to input slope design criteria that varies both

 

93



 

with azimuth and elevation.  The software enables the user to specify the bench face angle and berm width for a given sector of the pit.  The slope sectors specified by Golder had two azimuths, a “from” and a “to” (i.e. from 70(o) ENE to 120(o) ESE).  In Vulcan, these were specified transition azimuths for each slope sector.  Vulcan also inserts access ramp segments based on the design parameters and the location specified by the user.

 

The following sections provide design details for each of the pit designs completed for this study.

 

East Verde Ultimate Pit Design

 

Due to the complex nature of the geology in the East Verde pit area a number of different slope sectors had to be used for completing the original pit design.  The slope recommendations provided by Golder in 2003 formed the basis of that design.

 

Since then, mining experience and geotechnical reviews allowed to modify slightly the angles. The most recent work was completed by A. Karzulovic and Ass. Ltda of Santiago in April 2007. Figure 17-3 shows the pit geometry adopted in the yearend 2007 design.

 

Figure 17-2: Interramp angles for Verde Pit Design

 

 

94



 

West Verde Ultimate Pit Design

 

Slight adjustments to the interramp angles were made following the most recent geotechnical review completed in April 2007. An angle of 53 degrees is now used in the Verde Breccia compared to 51 degrees in the original design. In the porphyry material an angle of 53 degrees is also used in the design which corresponds to an increase of 3 degrees relative to the original design.

 

Figure 17-3: Verde Pit Design Phase 4 with Topography

 

 

17.10.2                               Pancho

 

The Pancho pit was designed using the same criteria as that used during the 2003 feasibility study.  Golder had recommended two slope design criterion and the appropriate rosettes were established in Vulcan.  The first rosette controlled the slope design from the pit bottom up to the 4300 elevation where the rock mass was generally considered more competent.   Inter-ramp angles varied from 44.5 to 49 degrees in the region southeast to the southwest. 

 

95



 

All other inter-ramp slopes were 52 degrees.  Above the 4300 elevation, controlled by the second rosette, the rock mass was considered to be weathered and therefore slope angles were shallower.  Golder recommended an inter-ramp angle of 38 degrees.  More recent geotechnical work by A. Karzulovic and Associates Ltda. of Santiago (April 2007) indicate that the angle in the volcanic material above 4300 m elevation could be increased to 43 degrees.  Figure 17-3 shows the pit geometry adopted.

 

Figure 17-4: Pancho Pit Design with Topography

 

 

The author, Maryse Bélanger, has no knowledge of any environmental, permitting, legal, ownership, taxation, political or other relevant issue that would materially affect the current Mineral Resource and Mineral Reserves estimates

 

96



 

18.0                                                OTHER RELEVANT DATA AND INFORMATION

 

There is no other data or information relevant to the project that is not covered in other sections of this report.

 

97



 

19.0                                                INTERPRETATION AND CONCLUSIONS

 

The Mineral Resource and Reserve Estimates for the Maricunga Project have been prepared under the direct supervision of Maryse Bélanger, P. Geo., Director Technical Services, Kinross Americas.

 

Ms. Bélanger is satisfied the data used in the estimation of Mineral Resources and Reserves is free of gross errors and omissions and is of suitable quality and sufficient quantity to use in estimating resources and reserves for the Verde and Pancho deposits.

 

98



 

20.0                                                RECOMMENDATIONS

 

The Maricunga mine is a producing gold mine for Kinross Gold Corporation.  The recommendation for successive work phases is not required.

 

99



 

21.0        REFERENCES

 

Anonymous, 1991, Final feasibility study, Verde Gold Deposit Maricunga Property, Northern Chile:  Mineral Resources Development Inc., unpublished report for Bema Gold Corp. and Compañia Minera Maricunga, several volumes.

 

Anonymous, 1992, Revised feasibility study, Verde Gold Deposit Maricunga Property, Northern Chile:  Mineral Resources Development Inc., unpublished report for Compañia Minera Maricunga, Bema Gold Corp. and Amax Gold Inc., one volume.

 

Anonymous, 2007, Application of the SART Process at Maricunga, Project Feasibility Study, Idesol Ingenieros S.A, unpublished report for Compañia Minera Maricunga, one volume.

 

Ardilla, R.J., 1997. Summary Of The Geology of The Pancho Gold Deposit, Maricunga. Internal Report, Minera Cyprus Chile Ltda.

 

CMM Staff Geologists, Carrasco, M, Crawford, K, Duran, M. Rodriquez, B. Romero, I, Strusvieci, M, Urrutia, H. Cortes, 2001, Geologia del Yacimento Verde (Geology of the Deposit Verde, English Translation):  Compania Minera Maricunga, unpublished geologic map (1:2,000).  NOTE:  The mapping was conducted in 2000 and 2001 after the mining was completed; therefore, it is a “final pit map”.  The map is of good quality and the mapping is generally confirmed by the Kinross mapping and compilation conducted in 2003 as part of the feasibility study.  AutoCad File:  geologia2001.dwg.

 

Compania Minera Maricunga, Procedimiento Mapeo Pozos Tronaduras.  Procedures Files, in CMM files.

 

Cortes, C., Omar 2000, Informe de Pruebas Geolmetalurgicas de Mineralizacion Mixta. Noviembre 1999 - Febrero 2000, In CMM files.

 

Emmons, D, Verde East and West Geologic Mapping, 2003,  Kinross internal report, May 10,2003.

 

100



 

Flores V., Roman, undated, Precious Metal Deposits of the Maricunga Area, Northern Chile, In Kinross Files.

 

Khin, B.G. 2003. Petrographic Descriptions, Pancho Project, Chile. Consultants Report Prepared For Kinross Gold Corp.

 

Kinross Technical Services, 1998, Maricunga Property Review, June 1998, report in Kinross Files.

 

Magri, Eduardo and NCL Consulting, Drillhole Database, Audit, SD001 a SD177., , July 1995.  in files Maricunga Mine Site

 

McDermott, Ryan, 2000, Maricunga Ore Type Classification, Memorandum to Brian Scott October 12 2000, in Kinross files.

 

McDermott, Ryan, 2001, Maricunga Model Summary and Explanation, Memorandum to Rick Dye, January 30 2001, in Kinross files.

 

Miller, Vic, and McDermott, Ryan, 1999, Maricunga Trip, Memorandum to Rick Dye Dated September 14, 1999, in Kinross files.

 

Meister, Susan N., 1998, Verde Block Model and Resource, Estimate Report, dated December 16, 1998.  In CMM files.

 

Miller, Victor, 2002, Maricunga Resources and Reserves, Memorandum to Rick Dye dated February 20 2002,  in Kinross files.

 

Muntean, J. L., 1998, Magmatic-hydrothermal gold deposits of the Maricunga Belt, Northern Chile:  Stanford University, Ph. D. dissertation, 407 p.

 

Muntean, J. L. and Einaudi, M. T., 2000, Porphyry gold deposits of the Maricunga District, Maricunga Belt, Northern Chile:  Economic Geology, v. 95, pp. 1445-1472.

 

101



 

Muntean, J.L. and Einaudi, M.T. 2001. Porphyry Epithermal Transition: Maricunga Belt, Northern Chile. Economic Geology, v 96, pp 743-772.

 

Pritting, J, Geologic Summary of the Pancho Project, Maricunga District, Chile, May 2003.

 

Romero, Ivan, 2000, Informe de Cierre Temporal de Actividades Cia Minera Maricunga, Noviembre de 2000, Modificacado enero 9 2001. In CMM files

 

Romero, Ivan, 2001, Programa de Termino de Geologia y Planificación Mina. In CMM files

 

Scott, Brian, 1998, Trip to Maricunga-Jan 12-22, 1998, Bema Gold Corporation Memorandum to Tom Garagan,  in CMM files.

 

Scott, Brian, 1999, Deep Verde Drilling, Consolidated Westview Resources Memorandum to Tom Garagan, dated April 23, 1999, in CMM files.

 

Scott, Brian, 1999b, Maricunga Metallurgical Info 1991 - 1998, Bema Gold Corporation Memorandum to Tom Garagan, dated August 31. in CMM files.

 

Scott, Brian, 2000, Maricunga - Met Program 2000 - Geologic Observations, Bema Gold Corp. Memorandum to Tom Garagan, in CMM files.

 

Sillitoe, R.S., 1991. Gold Metallogeny of Chile, An Introduction. Economic Geology v.86,  pp 1187-1205.

 

Sillitoe, R. H. and Camus, F., 1991, A special issues devoted to gold deposits in the Chilean Andes:  Economic Geology, v. 86, no. 6.  NOTE: contains papers on the Maricunga gold deposits and the Maricunga Gold Belt.

 

Spiteri, J. G. and Cohoon, G. A., 2002, Report on resources Verde deposits Maricunga, Chile (draft):  Spiteri Geological and Mining Consultants Inc., unpublished report for Kinross Gold Corp., 101 p.

 

SNC-Lavalin, Pre-Feasibility Study, Maricunga Project, September, 2003

 

102



 

SNC-Lavalin, Maricunga Mine Metallurgical Summary, December, 2003

 

Strusievici, Mihai 1998,  A Review of the Geology of Verde Gold Deposit, Preliminary Conclusions - Implication in the Resource Model, in CMM files

 

Strusievici, M., 1999, Geological report, mineralization model of Verde – targets for mine site exploration:  Compania Minera Maricunga, unpublished report with geologic map, 24 p.  NOTE:  Describes the staff geologic mapping for the 1999 Verde pit maps.

 

Strusievici, M., et al., 1999, Geologic maps Verde deposit:  Compania Minera Maricunga, unpublished geologic map (1:1,000).  NOTE:  The map is the product of a 1998 pit mapping project by CMM staff including geologists Crawford, K., Duran, Mauricio, and Urrutia, Hegel.  The map was compiled and interpreted by Strusievici and others.  AutoCAD File:  Verde Geo.dwg

 

Vila, T. and Sillitoe, 1991, Gold-rich porphyry systems in the Maricunga Belt, Northern Chile:  Economic Geology, v. 86, pp. 1238-1260.  NOTE:  The paper has a good summary of the exploration history of the Maricunga Belt.

 

Williams, S.A., 1997. Petrographic Descriptions, Pancho Project, Maricunga District. Consultant’s Report Prepared For Minera Cyprus Chile, Ltda.

 

Wolverson, N.J. 1997. Pancho Summary Report, 1997. Internal Report, Compania Minera Maricunga.

 

103



 

22.0        DATE AND SIGNATURE PAGE

 

The undersigned prepared this Technical report, titled NI-43-101 Technical Report for the Maricunga Gold Mine, dated 31 December 2007.  The format and content of the report are intended to conform to Form 43-101F1 of the National Instrument (NI 43-101) of the Canadian Securities Administrators.

 

 

“Signed and Sealed”

 

Maryse Bélanger, P. Geo.

31 March 2008

 

104



 

23.0        ADDITIONAL REQUIREMENTS FOR OPERATING PROPERTIES

 

23.1        Mining Operations

 

The Maricunga Mine is an operating mine with significant infrastructure in place. The reserve estimates presented in this document are sufficient to support the operation for 16 years based on daily production of 45,000 tpd.

 

Maricunga production re-opened in October 2005 and achieved its targeted production rate of 14 million tonnes per year (40,000 tonnes per day) in late 2005.  The mine operates two 12-hour shifts per day for 352 days annually allowing for inclement weather interruptions.  Final pit design for Verde and Pancho assumed 10 meter bench heights, bench face angles of 65° to 70°, berm widths of 8 to 11 meters, berm interval of 20 meters, inter-ramp angles of 38° to 52.5° and haul road gradient at 10% with a 25 meter road width.

 

The Maricunga gold recovery process consists of a single line primary crushing, fines crushing (secondary and tertiary), heap leach and adsorption and regeneration (“ADR”) plant operation. The process treats 45,000 tonnes per day of dry Maricunga ore using primary crushing followed by a secondary and tertiary crushing plant.  The crushing plant product is approximately 80% passing 10.5 millimetres.  A pad type heap leach and an ADR plant are used for gold recovery.

 

A comprehensive program of metallurgical testing incorporating bottle roll tests and column leach tests of samples obtained from drilling was established to determine gold recovery and reagent consumption data for the remaining Verde resources and the Pancho resource.  Based on the recovery estimates by ore type, process recovery over the mine life averaged 69% of contained gold in the plant feed.  Life of mine annual gold production is expected to range from 230,000 to 305,000 ounces on a 100% basis.

 

The increase in reserve as of December 31, 2007 will require an expansion of the heap leach facility. This report considered the findings of a pre-feasibility study level completed by Dave Prins of PrinZ Mining Services based in Santiago, Chile. The increased reserves will

 

105



 

result in the need to permit additional leach pad capacity but this is not considered to be a risk, as the existing permitted space is sufficient for the majority of the remaining reserves.

 

23.1.1     Mobile Equipment

 

The mine operates as a traditional open pit operation. A partial list of the major mine equipment necessary to achieve the planned production rate includes:

 

·                                          3 CAT 994D Front End Loaders

 

·                                          12 CAT 785C Haul Trucks

 

·                                          1 CAT 773E Haul Truck

 

·                                          2 Ingersol Rand 250 mm Rotary Drills

 

·                                          1 ECM 720 Rotary Drill

 

·                                          2 CAT D9R Bulldozers

 

·                                          2 CAT D8R Bulldozers

 

·                                          1 CAT D11R Bulldozer

 

·                                          2 CAT 14H and 16H Motor Graders

 

·                                          1 CAT 834 Wheel Dozer

 

·                                          1 50t Water Truck

 

·                                          1 CAT 330CL Backhoe

 

Ancillary equipment include fuel and lube trucks, flatbed trucks, portable light towers, and service and welding trucks.

 

23.1.2     Leach Pad and Plant Infrastructure

 

The plant facilities were upgraded with all the work completed by October 2005. Key aspects of the upgrade included establishing a 110 km power line to replace the generated power currently at site. Additional capital expenditures went towards replacing certain components to improve availability and throughput of the crushing and conveying system. All equipment and systems are in place and allow for meeting a daily throughput target of 45,000 tpd.

 

106



 

In 2007 the SART process was tested for the Pancho ore as uneconomic concentrations of copper are present in ore. Some of the copper minerals are soluble in cyanide solutions and these minerals consume cyanide reagent and contaminate the leach solution with copper metal.  A feasibility study and pilot testing program were completed by Idesol of Santiago. The study considers plant design, performance metrics, operating and capital costs and implementation strategy. The reserves defined at Pancho consider the application of SART.

 

23.2        Recoverability

 

Metallurgical recovery information is discussed in detail in Section 16 of this report.

 

23.3        Markets

 

Kinross will continue with current marketing arrangements at Maricunga and does not envision any concerns related to marketing doré.

 

23.4        Contracts

 

Smelting, refining, handling and sales charges are within industry standards.

 

23.5        Environmental Considerations

 

A reclamation plan for the current mine disturbance was approved in 2002, based on the commitments made in the original environmental impact assessment for the site (1994).  The plan addressed physical activities, such as earthworks, but did not address chemical closure of the heap.  A closure plan for chemical stabilization of the heap has been prepared and has been submitted to the regulatory authorities in the form of a Declaration of Impact to the Environment (“DIA”).  The regulatory agencies are currently considering the Company’s proposed chemical stabilization approach and further discussions with agencies are expected prior to a decision regarding the chemical stabilization plan.  The agencies consider submittal of the chemical stabilization DIA as meeting the commitments in the original environmental impact

 

Future cash outflows for site restoration costs at Maricunga under CICA Handbook Section 3110, as at December 31, 2007, are estimated at approximately US $4.4 million.  There is

 

107



 

no requirement to post financial assurance to secure site restoration costs in Chile at present.

 

The increased reserves will result in the need to permit additional leach pad capacity but this is not considered to be a risk, as the existing permitted space is sufficient for the majority of the remaining reserves.

 

23.6        Capital Costs

 

Capital requirements were defined based on a mine life of 16 years utilizing the SART process in future years. The capital costs critical items include construction costs for the SART process facility, sustaining capital for continued expansion of the existing leach pad and partial replacement of the mining fleet in year 2015. The breakdown of costs was established by activity area. They are reported in three main categories: mining, processing and others.  The costs associated with upgrading some existing equipment in 2008 report to the Other category.  The schedule of capital costs is presented in Table 23-1.

 

Table 23-1: Capital Costs – Maricunga

 

 

 

2008

 

2009

 

2010

 

2011

 

2012

 

2013

 

2014

 

2015

 

2016

 

2017

 

Mining

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Stripping

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Project construction

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Equipment

 

1,900

 

7,200

 

13,290

 

10,650

 

2,050

 

 

 

13,530

 

28,900

 

1,500

 

4,300

 

Sustaining

 

10,233

 

3,227

 

10,965

 

841

 

755

 

473

 

325

 

583

 

341

 

855

 

Other

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Subtotal

 

12,133

 

10,427

 

24,255

 

11,491

 

2,805

 

473

 

13,855

 

29,483

 

1,841

 

5,155

 

Processing

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Project Construction

 

8,000

 

2,000

 

29,387

 

24,926

 

5,000

 

3,000

 

3,500

 

3,500

 

3,500

 

3,500

 

Equipment

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sustaining

 

 

 

1,000

 

 

 

 

 

 

 

500

 

 

 

 

 

 

 

500

 

SART

 

539

 

19,704

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Subtotal

 

8,539

 

22,704

 

29,387

 

24,926

 

5,000

 

3,500

 

3,500

 

3,500

 

3,500

 

4,000

 

Other

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Project Construction

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Equipment

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sustaining

 

14,879

 

-13,916

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Subtotal

 

14,879

 

-13,916

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Capital Costs

 

35,551

 

19,215

 

53,642

 

36,417

 

7,805

 

3,973

 

17,355

 

32,983

 

5,341

 

9,155

 

 

108



 

 

 

2018

 

2019

 

2020

 

2021

 

2022

 

2023

 

2024

 

Mining

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Stripping

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Project construction

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Equipment

 

980

 

 

 

 

 

 

 

 

 

 

 

 

 

Sustaining

 

325

 

325

 

225

 

 

 

 

 

 

 

 

 

Other

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Subtotal

 

1,305

 

325

 

225

 

 

 

 

 

 

 

 

 

Processing

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Project Construction

 

3,500

 

3,500

 

3,500

 

3,500

 

3,500

 

3,500

 

 

 

Equipment

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sustaining

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SART

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Subtotal

 

3,500

 

3,500

 

3,500

 

3,500

 

3,500

 

3,500

 

 

 

Other

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Project Construction

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Equipment

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sustaining

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Subtotal

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Capital Costs

 

4,805

 

3,825

 

3,725

 

3,500

 

3,500

 

3,500

 

0

 

 

Note: All amounts expressed in Table 23-1 are in thousands of dollars.

 

23.7        Operating Costs

 

Operating cost estimates were originally prepared based on first-principles and verified to historical mine operating costs available for the project. Operating costs used in this report are consistent with present operating experience. They are updated on a regular basis with a full cost review completed in November 2007.

 

A detailed 2008 and LOM budget has been developed for the mine based on an actual operating cost history and projected future performance.  Current operating costs are similar to most mines of this size and equipment age and are presented in Table 23-2.

 

Table 23-2: 2007 Actual Operating Costs – Maricunga

 

Item

 

2007 Actual Cost

Ktonnes Mined

 

25,800

Ktonnes to Leach

 

13,691

Mining cost ($/tonne mined)

 

$

1.09

Mining cost ($/tonne processed)

 

$

2.05

Leaching cost ($/tonne processed)

 

$

3.37

G&A ($/tonne processed)

 

$

1.26

 

109



 

23.8        Economic Analyses

 

The discounted cash flow analysis indicates that the mine generates a positive cash flow.  The details of the economic and sensitivity analyses are considered by Kinross to be confidential information. The economic models are considered as complete, reasonable, and meeting generally accepted industry standards. This information is available and individuals seeking to review these models must request and sign a confidentiality agreement with Kinross Gold Corporation.

 

23.9        Payback

 

This is not applicable to the producing operation.

 

23.10      Mine Life

 

A complete Life-of-Mine plan was prepared based on the estimated mineral reserves. The mineral reserves are sufficient to support gold production until 2024 (see Table 23-3).

 

Table 23-3: 2007 Life of Mine Plan

 

Year

 

2008

 

2009

 

2010

 

2011

 

2012

 

2013

 

2014

 

2015

 

 

 

Ore (tonnes)

 

15,400,000

 

16,051,200

 

17,234,805

 

17,259,980

 

17,285,155

 

17,285,155

 

17,285,155

 

17,285,155

 

 

 

Strip ratio

 

0.68

 

0.97

 

0.97

 

0.97

 

0.93

 

0.93

 

0.93

 

0.93

 

 

 

Waste (tonnes)

 

10,471,820

 

15,610,696

 

16,717,761

 

16,742,181

 

16,075,194

 

16,075,194

 

16,075,194

 

16,075,194

 

 

 

Grade (g/t)

 

0.77

 

0.82

 

0.80

 

0.78

 

0.80

 

0.78

 

0.69

 

0.64

 

 

 

Recovery (%)

 

58.2

%

56.2

%

58.2

%

63.9

%

83.1

%

77.8

%

75.7

%

74.0

%

 

 

Recov. ounces

 

222,753

 

239,048

 

257,383

 

278,076

 

371,321

 

335,893

 

290,088

 

264,647

 

 

 

Total tonnes

 

25,871,820

 

31,661,896

 

33,952,566

 

34,002,161

 

33,360,349

 

33,360,349

 

33,360,349

 

33,360,349

 

 

 

 

Year

 

2016

 

2017

 

2018

 

2019

 

2020

 

2021

 

2022

 

2023

 

2024

 

Ore (tonnes)

 

17,285,155

 

17,285,155

 

17,285,155

 

17,285,155

 

17,285,155

 

17,285,155

 

17,285,155

 

17,285,155

 

6,603,551

 

Strip ratio

 

0.93

 

0.93

 

0.93

 

0.93

 

0.93

 

0.38

 

0.16

 

0.23

 

0.21

 

Waste (tonnes)

 

16,075,194

 

16,075,194

 

16,075,194

 

16,075,194

 

16,075,194

 

6,646,585

 

2,767,186

 

4,023,861

 

1,372,398

 

Grade (g/t)

 

0.58

 

0.78

 

0.73

 

0.65

 

0.63

 

0.73

 

0.63

 

0.66

 

0.62

 

Recovery (%)

 

71.4

%

65.6

%

57.9

%

58.7

%

75.3

%

69.8

%

72.4

%

68.2

%

68.0

%

Recov. ounces

 

231,371

 

285,514

 

234,528

 

213,115

 

262,729

 

283,548

 

253,468

 

251,302

 

89,768

 

Total tonnes

 

33,360,349

 

33,360,349

 

33,360,349

 

33,360,349

 

33,360,349

 

23,931,740

 

20,052,341

 

21,309,016

 

7,975,949

 

 

110