NOTE 11. PROPERTY, PLANT, AND EQUIPMENT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Construction Expenditures in Accounts Payable

 

            Construction expenditures included in accounts payable at September 30, 2012 are $315.1 million for Entergy, $12.4 million for Entergy Arkansas, $47.2 million for Entergy Gulf States Louisiana, $159.5 million for Entergy Louisiana, $15 million for Entergy Mississippi, $15.3 million for Entergy New Orleans, $3.5 million for Entergy Texas, and $24.8 million for System Energy. Construction expenditures included in accounts payable at December 31, 2011 are $171.2 million for Entergy, $14.1 million for Entergy Arkansas, $13.7 million for Entergy Gulf States Louisiana, $27 million for Entergy Louisiana, $4.3 million for Entergy Mississippi, $3.6 million for Entergy New Orleans, $4.3 million for Entergy Texas, and $32.9 million for System Energy.

 

Vermont Yankee

 

            In March 2011 the NRC renewed Vermont Yankee's operating license for an additional 20 years.  The renewed operating license expires in March 2032.  In May 2011 the Vermont Department of Public Service and the New England Coalition petitioned the United States Court of Appeals for the D.C. Circuit seeking judicial review of the NRC's issuance of the renewed operating license, alleging that the license had been issued without a valid and effective water quality certification under Section 401 of the Clean Water Act.  Entergy Nuclear Vermont Yankee and Entergy Nuclear Operations, Inc. intervened in the proceeding.  In June 2012 the Court of Appeals denied the appeal on the ground that the petitioners had failed to exhaust their administrative remedies before the NRC.  The time for seeking further judicial review of the NRC's issuance of Vermont Yankee's renewed operating license has expired.

 

            Vermont Yankee also is operating under a Certificate of Public Good from the State of Vermont that was scheduled to expire in March 2012, but has an application pending before the Vermont Public Service Board (VPSB) for a new Certificate of Public Good for operation until March 2032.  In April 2011, Entergy Nuclear Vermont Yankee and Entergy Nuclear Operations, the owner and operator respectively of Vermont Yankee, filed suit in the United States District Court for the District of Vermont.  The suit challenged certain conditions imposed by Vermont upon Vermont Yankee's continued operation and storage of spent nuclear fuel, including the requirement to obtain not only a new Certificate of Public Good, but also approval by Vermont's General Assembly.  In January 2012 the court entered judgment in Entergy's favor and specifically:

 

·                     Declared that Vermont's laws requiring Vermont Yankee to cease operation in March 2012 and prohibiting the storage of spent nuclear fuel from operation after that date, absent approval by the General Assembly, were based on radiological safety concerns and are preempted by the Atomic Energy Act;

·                     Permanently enjoined Vermont from enforcing these preempted requirements of the state's laws; and

·                     Permanently enjoined Vermont under the Commerce Clause of the United States Constitution from conditioning the issuance of a new Certificate of Public Good upon the existence of a below wholesale market power sale agreement with Vermont utilities or Vermont Yankee's selling power to Vermont utilities at rates below those available to wholesale customers in other states.

 

In February 2012 the Vermont defendants appealed the decision to the United States Court of Appeals for the Second Circuit. Vermont Yankee cross-appealed on two grounds: (1) the Federal Power Act alternatively preempts conditioning the issuance of a new Certificate of Public Good upon the existence of a below wholesale market power sale agreement with Vermont utilities or Vermont Yankee's selling power to Vermont utilities at rates below those available to wholesale customers in other states (an issue the District Court found unnecessary to decide in light of its ruling under the Commerce Clause); and (2) a request to make permanent the injunction pending appeal that the District Court entered on March 19, 2012 which prohibits Vermont from enforcing a statutory provision to compel Vermont Yankee to shut down because the cumulative total amount of spent fuel stored at the site exceeds the amount derived from the operation of the facility up to, but not beyond, March 21, 2012 (a provision the enforcement of which the January 2012 decision had not enjoined). The appeal and cross-appeal remain pending.

 

            In January 2012, Entergy filed a motion requesting that the VPSB grant, based on the existing record in its proceeding, Vermont Yankee's pending application for a new Certificate of Public Good.  Entergy subsequently filed another motion asking the VPSB to declare that title 3, section 814(b) of the Vermont statutes (3 V.S.A. § 814(b)) authorized Vermont Yankee to operate while the Certificate of Public Good proceeding was pending because Entergy had timely filed a petition for a new Certificate of Public Good that had not yet been decided.  In March 2012, the VPSB issued orders denying Entergy's motion with respect to 3 V.S.A. § 814(b) but stating that the order did not require Vermont Yankee to cease operations, denying Entergy's motion to issue a new Certificate of Public Good based on the existing record, determining to open a new docket and to create a new record to decide Vermont Yankee's request for a new Certificate of Public Good (without prejudice to any rights that Entergy might have under 3 V.S.A. § 814(b)), and directing Entergy to file an amended Certificate of Public Good petition that identified the specific approvals it was seeking in light of the district court's decision.  In April 2012, Entergy filed its amended Certificate of Public Good petition and in June 2012 filed its initial testimony in support of that petition.  The VPSB's current schedule provides for proceedings concerning that petition to continue until August 2013.

 

In September 2012, Entergy filed a petition asking the VPSB to issue a Certificate of Public Good allowing construction at Vermont Yankee for a diesel generator to provide power in the event of a station blackout. Vermont Yankee currently can obtain such power from the Vernon Dam. Due to changes instituted by ISO-New England, Vermont Yankee will no longer be able to rely upon the Vernon Dam in the event of a station blackout after August 31, 2013 and therefore plans to install a new diesel generator as a replacement power source. The VPSB requested and received comments on Entergy's September 2012 petition and its relationship to Entergy's other petition for a Certificate of Public Good, but has not yet provided a schedule for its consideration of the September 2012 petition.

 

Impairment

 

            Because of the uncertainty regarding the continued operation of Vermont Yankee, Entergy has tested the recoverability of the plant and related assets each quarter since the first quarter 2010.  The determination of recoverability is based on the probability-weighted undiscounted net cash flows expected to be generated by the plant and related assets.  Projected net cash flows primarily depend on the status of the pending legal and state regulatory matters, as well as projections of future revenues and expenses over the remaining life of the plant.  Prior to the first quarter 2012, the probability-weighted undiscounted net cash flows exceeded the carrying value of the Vermont Yankee plant and related assets.  The decline, however, in the overall energy market and the projected forward prices of power as of March 31, 2012, which are significant inputs in the determination of net cash flows, resulted in the probability-weighted undiscounted future cash flows being less than the asset group's carrying value.  Entergy performed a fair value analysis based on the income approach, a discounted cash flow method, to determine the amount of impairment. The estimated fair value of the plant and related assets at March 31, 2012 was $162.0 million, while the carrying value was $517.5 million.  Therefore, the assets were written down to their fair value and an impairment charge of $355.5 million ($223.5 million after-tax) was recognized.  The impairment charge is recorded as a separate line item in Entergy's consolidated statement of income for the nine months ended September 30, 2012, and is included within the results of the Entergy Wholesale Commodities segment.

 

            The estimate of fair value was based on the price that Entergy would expect to receive in a hypothetical sale of the Vermont Yankee plant and related assets to a market participant on March 31, 2012.  In order to determine this price, Entergy used significant observable inputs, including quoted forward power and gas prices, where available.  Significant unobservable inputs, such as projected long-term pre-tax operating margins (cash basis), and estimated weighted average costs of capital were also used in the estimation of fair value.  In addition, Entergy made certain assumptions regarding future tax deductions associated with the plant and related assets.  Based on the use of significant unobservable inputs, the fair value measurement for the entirety of the asset group, and for each type of asset within the asset group, is classified as Level 3 in the fair value hierarchy discussed in Note 8 to the financial statements.

 

The following table sets forth a description of significant unobservable inputs used in the valuation of the Vermont Yankee plant and related assets as of March 31, 2012:

 

 

Significant Unobservable Inputs

 

Range

Weighted Average

Weighted average cost of capital

7.5%-8.0%

7.8%

Long-term pre-tax operating margin (cash basis)

6.1%-7.8%

7.2%

 

Entergy's Accounting Policy group, which reports to the Chief Accounting Officer, was primarily responsible for determining the valuation of the Vermont Yankee plant and related assets, in consultation with external advisors. Accounting Policy obtained and reviewed information from other Entergy departments with expertise on the various inputs and assumptions that were necessary to calculate the fair value of the asset group.

Entergy Arkansas [Member]
 
Property, Plant And Equipment

NOTE 11. PROPERTY, PLANT, AND EQUIPMENT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Construction Expenditures in Accounts Payable

 

            Construction expenditures included in accounts payable at September 30, 2012 are $315.1 million for Entergy, $12.4 million for Entergy Arkansas, $47.2 million for Entergy Gulf States Louisiana, $159.5 million for Entergy Louisiana, $15 million for Entergy Mississippi, $15.3 million for Entergy New Orleans, $3.5 million for Entergy Texas, and $24.8 million for System Energy. Construction expenditures included in accounts payable at December 31, 2011 are $171.2 million for Entergy, $14.1 million for Entergy Arkansas, $13.7 million for Entergy Gulf States Louisiana, $27 million for Entergy Louisiana, $4.3 million for Entergy Mississippi, $3.6 million for Entergy New Orleans, $4.3 million for Entergy Texas, and $32.9 million for System Energy.

 


Vermont Yankee

 

            In March 2011 the NRC renewed Vermont Yankee's operating license for an additional 20 years.  The renewed operating license expires in March 2032.  In May 2011 the Vermont Department of Public Service and the New England Coalition petitioned the United States Court of Appeals for the D.C. Circuit seeking judicial review of the NRC's issuance of the renewed operating license, alleging that the license had been issued without a valid and effective water quality certification under Section 401 of the Clean Water Act.  Entergy Nuclear Vermont Yankee and Entergy Nuclear Operations, Inc. intervened in the proceeding.  In June 2012 the Court of Appeals denied the appeal on the ground that the petitioners had failed to exhaust their administrative remedies before the NRC.  The time for seeking further judicial review of the NRC's issuance of Vermont Yankee's renewed operating license has expired.

 

            Vermont Yankee also is operating under a Certificate of Public Good from the State of Vermont that was scheduled to expire in March 2012, but has an application pending before the Vermont Public Service Board (VPSB) for a new Certificate of Public Good for operation until March 2032.  In April 2011, Entergy Nuclear Vermont Yankee and Entergy Nuclear Operations, the owner and operator respectively of Vermont Yankee, filed suit in the United States District Court for the District of Vermont.  The suit challenged certain conditions imposed by Vermont upon Vermont Yankee's continued operation and storage of spent nuclear fuel, including the requirement to obtain not only a new Certificate of Public Good, but also approval by Vermont's General Assembly.  In January 2012 the court entered judgment in Entergy's favor and specifically:

 

·                     Declared that Vermont's laws requiring Vermont Yankee to cease operation in March 2012 and prohibiting the storage of spent nuclear fuel from operation after that date, absent approval by the General Assembly, were based on radiological safety concerns and are preempted by the Atomic Energy Act;

·                     Permanently enjoined Vermont from enforcing these preempted requirements of the state's laws; and

·                     Permanently enjoined Vermont under the Commerce Clause of the United States Constitution from conditioning the issuance of a new Certificate of Public Good upon the existence of a below wholesale market power sale agreement with Vermont utilities or Vermont Yankee's selling power to Vermont utilities at rates below those available to wholesale customers in other states.

 

In February 2012 the Vermont defendants appealed the decision to the United States Court of Appeals for the Second Circuit. Vermont Yankee cross-appealed on two grounds: (1) the Federal Power Act alternatively preempts conditioning the issuance of a new Certificate of Public Good upon the existence of a below wholesale market power sale agreement with Vermont utilities or Vermont Yankee's selling power to Vermont utilities at rates below those available to wholesale customers in other states (an issue the District Court found unnecessary to decide in light of its ruling under the Commerce Clause); and (2) a request to make permanent the injunction pending appeal that the District Court entered on March 19, 2012 which prohibits Vermont from enforcing a statutory provision to compel Vermont Yankee to shut down because the cumulative total amount of spent fuel stored at the site exceeds the amount derived from the operation of the facility up to, but not beyond, March 21, 2012 (a provision the enforcement of which the January 2012 decision had not enjoined). The appeal and cross-appeal remain pending.

 

            In January 2012, Entergy filed a motion requesting that the VPSB grant, based on the existing record in its proceeding, Vermont Yankee's pending application for a new Certificate of Public Good.  Entergy subsequently filed another motion asking the VPSB to declare that title 3, section 814(b) of the Vermont statutes (3 V.S.A. § 814(b)) authorized Vermont Yankee to operate while the Certificate of Public Good proceeding was pending because Entergy had timely filed a petition for a new Certificate of Public Good that had not yet been decided.  In March 2012, the VPSB issued orders denying Entergy's motion with respect to 3 V.S.A. § 814(b) but stating that the order did not require Vermont Yankee to cease operations, denying Entergy's motion to issue a new Certificate of Public Good based on the existing record, determining to open a new docket and to create a new record to decide Vermont Yankee's request for a new Certificate of Public Good (without prejudice to any rights that Entergy might have under 3 V.S.A. § 814(b)), and directing Entergy to file an amended Certificate of Public Good petition that identified the specific approvals it was seeking in light of the district court's decision.  In April 2012, Entergy filed its amended Certificate of Public Good petition and in June 2012 filed its initial testimony in support of that petition.  The VPSB's current schedule provides for proceedings concerning that petition to continue until August 2013.

 

In September 2012, Entergy filed a petition asking the VPSB to issue a Certificate of Public Good allowing construction at Vermont Yankee for a diesel generator to provide power in the event of a station blackout. Vermont Yankee currently can obtain such power from the Vernon Dam. Due to changes instituted by ISO-New England, Vermont Yankee will no longer be able to rely upon the Vernon Dam in the event of a station blackout after August 31, 2013 and therefore plans to install a new diesel generator as a replacement power source. The VPSB requested and received comments on Entergy's September 2012 petition and its relationship to Entergy's other petition for a Certificate of Public Good, but has not yet provided a schedule for its consideration of the September 2012 petition.

 

 

Impairment

 

            Because of the uncertainty regarding the continued operation of Vermont Yankee, Entergy has tested the recoverability of the plant and related assets each quarter since the first quarter 2010.  The determination of recoverability is based on the probability-weighted undiscounted net cash flows expected to be generated by the plant and related assets.  Projected net cash flows primarily depend on the status of the pending legal and state regulatory matters, as well as projections of future revenues and expenses over the remaining life of the plant.  Prior to the first quarter 2012, the probability-weighted undiscounted net cash flows exceeded the carrying value of the Vermont Yankee plant and related assets.  The decline, however, in the overall energy market and the projected forward prices of power as of March 31, 2012, which are significant inputs in the determination of net cash flows, resulted in the probability-weighted undiscounted future cash flows being less than the asset group's carrying value.  Entergy performed a fair value analysis based on the income approach, a discounted cash flow method, to determine the amount of impairment. The estimated fair value of the plant and related assets at March 31, 2012 was $162.0 million, while the carrying value was $517.5 million.  Therefore, the assets were written down to their fair value and an impairment charge of $355.5 million ($223.5 million after-tax) was recognized.  The impairment charge is recorded as a separate line item in Entergy's consolidated statement of income for the nine months ended September 30, 2012, and is included within the results of the Entergy Wholesale Commodities segment.

 

            The estimate of fair value was based on the price that Entergy would expect to receive in a hypothetical sale of the Vermont Yankee plant and related assets to a market participant on March 31, 2012.  In order to determine this price, Entergy used significant observable inputs, including quoted forward power and gas prices, where available.  Significant unobservable inputs, such as projected long-term pre-tax operating margins (cash basis), and estimated weighted average costs of capital were also used in the estimation of fair value.  In addition, Entergy made certain assumptions regarding future tax deductions associated with the plant and related assets.  Based on the use of significant unobservable inputs, the fair value measurement for the entirety of the asset group, and for each type of asset within the asset group, is classified as Level 3 in the fair value hierarchy discussed in Note 8 to the financial statements.

 

The following table sets forth a description of significant unobservable inputs used in the valuation of the Vermont Yankee plant and related assets as of March 31, 2012:

 

 

Significant Unobservable Inputs

 

Range

Weighted Average

Weighted average cost of capital

7.5%-8.0%

7.8%

Long-term pre-tax operating margin (cash basis)

6.1%-7.8%

7.2%

 

Entergy's Accounting Policy group, which reports to the Chief Accounting Officer, was primarily responsible for determining the valuation of the Vermont Yankee plant and related assets, in consultation with external advisors. Accounting Policy obtained and reviewed information from other Entergy departments with expertise on the various inputs and assumptions that were necessary to calculate the fair value of the asset group.

Entergy Gulf States Louisiana [Member]
 
Property, Plant And Equipment

NOTE 11. PROPERTY, PLANT, AND EQUIPMENT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Construction Expenditures in Accounts Payable

 

            Construction expenditures included in accounts payable at September 30, 2012 are $315.1 million for Entergy, $12.4 million for Entergy Arkansas, $47.2 million for Entergy Gulf States Louisiana, $159.5 million for Entergy Louisiana, $15 million for Entergy Mississippi, $15.3 million for Entergy New Orleans, $3.5 million for Entergy Texas, and $24.8 million for System Energy. Construction expenditures included in accounts payable at December 31, 2011 are $171.2 million for Entergy, $14.1 million for Entergy Arkansas, $13.7 million for Entergy Gulf States Louisiana, $27 million for Entergy Louisiana, $4.3 million for Entergy Mississippi, $3.6 million for Entergy New Orleans, $4.3 million for Entergy Texas, and $32.9 million for System Energy.

 


Vermont Yankee

 

            In March 2011 the NRC renewed Vermont Yankee's operating license for an additional 20 years.  The renewed operating license expires in March 2032.  In May 2011 the Vermont Department of Public Service and the New England Coalition petitioned the United States Court of Appeals for the D.C. Circuit seeking judicial review of the NRC's issuance of the renewed operating license, alleging that the license had been issued without a valid and effective water quality certification under Section 401 of the Clean Water Act.  Entergy Nuclear Vermont Yankee and Entergy Nuclear Operations, Inc. intervened in the proceeding.  In June 2012 the Court of Appeals denied the appeal on the ground that the petitioners had failed to exhaust their administrative remedies before the NRC.  The time for seeking further judicial review of the NRC's issuance of Vermont Yankee's renewed operating license has expired.

 

            Vermont Yankee also is operating under a Certificate of Public Good from the State of Vermont that was scheduled to expire in March 2012, but has an application pending before the Vermont Public Service Board (VPSB) for a new Certificate of Public Good for operation until March 2032.  In April 2011, Entergy Nuclear Vermont Yankee and Entergy Nuclear Operations, the owner and operator respectively of Vermont Yankee, filed suit in the United States District Court for the District of Vermont.  The suit challenged certain conditions imposed by Vermont upon Vermont Yankee's continued operation and storage of spent nuclear fuel, including the requirement to obtain not only a new Certificate of Public Good, but also approval by Vermont's General Assembly.  In January 2012 the court entered judgment in Entergy's favor and specifically:

 

·                     Declared that Vermont's laws requiring Vermont Yankee to cease operation in March 2012 and prohibiting the storage of spent nuclear fuel from operation after that date, absent approval by the General Assembly, were based on radiological safety concerns and are preempted by the Atomic Energy Act;

·                     Permanently enjoined Vermont from enforcing these preempted requirements of the state's laws; and

·                     Permanently enjoined Vermont under the Commerce Clause of the United States Constitution from conditioning the issuance of a new Certificate of Public Good upon the existence of a below wholesale market power sale agreement with Vermont utilities or Vermont Yankee's selling power to Vermont utilities at rates below those available to wholesale customers in other states.

 

In February 2012 the Vermont defendants appealed the decision to the United States Court of Appeals for the Second Circuit. Vermont Yankee cross-appealed on two grounds: (1) the Federal Power Act alternatively preempts conditioning the issuance of a new Certificate of Public Good upon the existence of a below wholesale market power sale agreement with Vermont utilities or Vermont Yankee's selling power to Vermont utilities at rates below those available to wholesale customers in other states (an issue the District Court found unnecessary to decide in light of its ruling under the Commerce Clause); and (2) a request to make permanent the injunction pending appeal that the District Court entered on March 19, 2012 which prohibits Vermont from enforcing a statutory provision to compel Vermont Yankee to shut down because the cumulative total amount of spent fuel stored at the site exceeds the amount derived from the operation of the facility up to, but not beyond, March 21, 2012 (a provision the enforcement of which the January 2012 decision had not enjoined). The appeal and cross-appeal remain pending.

 

            In January 2012, Entergy filed a motion requesting that the VPSB grant, based on the existing record in its proceeding, Vermont Yankee's pending application for a new Certificate of Public Good.  Entergy subsequently filed another motion asking the VPSB to declare that title 3, section 814(b) of the Vermont statutes (3 V.S.A. § 814(b)) authorized Vermont Yankee to operate while the Certificate of Public Good proceeding was pending because Entergy had timely filed a petition for a new Certificate of Public Good that had not yet been decided.  In March 2012, the VPSB issued orders denying Entergy's motion with respect to 3 V.S.A. § 814(b) but stating that the order did not require Vermont Yankee to cease operations, denying Entergy's motion to issue a new Certificate of Public Good based on the existing record, determining to open a new docket and to create a new record to decide Vermont Yankee's request for a new Certificate of Public Good (without prejudice to any rights that Entergy might have under 3 V.S.A. § 814(b)), and directing Entergy to file an amended Certificate of Public Good petition that identified the specific approvals it was seeking in light of the district court's decision.  In April 2012, Entergy filed its amended Certificate of Public Good petition and in June 2012 filed its initial testimony in support of that petition.  The VPSB's current schedule provides for proceedings concerning that petition to continue until August 2013.

 

In September 2012, Entergy filed a petition asking the VPSB to issue a Certificate of Public Good allowing construction at Vermont Yankee for a diesel generator to provide power in the event of a station blackout. Vermont Yankee currently can obtain such power from the Vernon Dam. Due to changes instituted by ISO-New England, Vermont Yankee will no longer be able to rely upon the Vernon Dam in the event of a station blackout after August 31, 2013 and therefore plans to install a new diesel generator as a replacement power source. The VPSB requested and received comments on Entergy's September 2012 petition and its relationship to Entergy's other petition for a Certificate of Public Good, but has not yet provided a schedule for its consideration of the September 2012 petition.

 

Impairment

 

            Because of the uncertainty regarding the continued operation of Vermont Yankee, Entergy has tested the recoverability of the plant and related assets each quarter since the first quarter 2010.  The determination of recoverability is based on the probability-weighted undiscounted net cash flows expected to be generated by the plant and related assets.  Projected net cash flows primarily depend on the status of the pending legal and state regulatory matters, as well as projections of future revenues and expenses over the remaining life of the plant.  Prior to the first quarter 2012, the probability-weighted undiscounted net cash flows exceeded the carrying value of the Vermont Yankee plant and related assets.  The decline, however, in the overall energy market and the projected forward prices of power as of March 31, 2012, which are significant inputs in the determination of net cash flows, resulted in the probability-weighted undiscounted future cash flows being less than the asset group's carrying value.  Entergy performed a fair value analysis based on the income approach, a discounted cash flow method, to determine the amount of impairment. The estimated fair value of the plant and related assets at March 31, 2012 was $162.0 million, while the carrying value was $517.5 million.  Therefore, the assets were written down to their fair value and an impairment charge of $355.5 million ($223.5 million after-tax) was recognized.  The impairment charge is recorded as a separate line item in Entergy's consolidated statement of income for the nine months ended September 30, 2012, and is included within the results of the Entergy Wholesale Commodities segment.

 

            The estimate of fair value was based on the price that Entergy would expect to receive in a hypothetical sale of the Vermont Yankee plant and related assets to a market participant on March 31, 2012.  In order to determine this price, Entergy used significant observable inputs, including quoted forward power and gas prices, where available.  Significant unobservable inputs, such as projected long-term pre-tax operating margins (cash basis), and estimated weighted average costs of capital were also used in the estimation of fair value.  In addition, Entergy made certain assumptions regarding future tax deductions associated with the plant and related assets.  Based on the use of significant unobservable inputs, the fair value measurement for the entirety of the asset group, and for each type of asset within the asset group, is classified as Level 3 in the fair value hierarchy discussed in Note 8 to the financial statements.

 

The following table sets forth a description of significant unobservable inputs used in the valuation of the Vermont Yankee plant and related assets as of March 31, 2012:

 

 

Significant Unobservable Inputs

 

Range

Weighted Average

Weighted average cost of capital

7.5%-8.0%

7.8%

Long-term pre-tax operating margin (cash basis)

6.1%-7.8%

7.2%

 

Entergy's Accounting Policy group, which reports to the Chief Accounting Officer, was primarily responsible for determining the valuation of the Vermont Yankee plant and related assets, in consultation with external advisors. Accounting Policy obtained and reviewed information from other Entergy departments with expertise on the various inputs and assumptions that were necessary to calculate the fair value of the asset group.

Entergy Louisiana [Member]
 
Property, Plant And Equipment

NOTE 11. PROPERTY, PLANT, AND EQUIPMENT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Construction Expenditures in Accounts Payable

 

            Construction expenditures included in accounts payable at September 30, 2012 are $315.1 million for Entergy, $12.4 million for Entergy Arkansas, $47.2 million for Entergy Gulf States Louisiana, $159.5 million for Entergy Louisiana, $15 million for Entergy Mississippi, $15.3 million for Entergy New Orleans, $3.5 million for Entergy Texas, and $24.8 million for System Energy. Construction expenditures included in accounts payable at December 31, 2011 are $171.2 million for Entergy, $14.1 million for Entergy Arkansas, $13.7 million for Entergy Gulf States Louisiana, $27 million for Entergy Louisiana, $4.3 million for Entergy Mississippi, $3.6 million for Entergy New Orleans, $4.3 million for Entergy Texas, and $32.9 million for System Energy.

 


Vermont Yankee

 

            In March 2011 the NRC renewed Vermont Yankee's operating license for an additional 20 years.  The renewed operating license expires in March 2032.  In May 2011 the Vermont Department of Public Service and the New England Coalition petitioned the United States Court of Appeals for the D.C. Circuit seeking judicial review of the NRC's issuance of the renewed operating license, alleging that the license had been issued without a valid and effective water quality certification under Section 401 of the Clean Water Act.  Entergy Nuclear Vermont Yankee and Entergy Nuclear Operations, Inc. intervened in the proceeding.  In June 2012 the Court of Appeals denied the appeal on the ground that the petitioners had failed to exhaust their administrative remedies before the NRC.  The time for seeking further judicial review of the NRC's issuance of Vermont Yankee's renewed operating license has expired.

 

            Vermont Yankee also is operating under a Certificate of Public Good from the State of Vermont that was scheduled to expire in March 2012, but has an application pending before the Vermont Public Service Board (VPSB) for a new Certificate of Public Good for operation until March 2032.  In April 2011, Entergy Nuclear Vermont Yankee and Entergy Nuclear Operations, the owner and operator respectively of Vermont Yankee, filed suit in the United States District Court for the District of Vermont.  The suit challenged certain conditions imposed by Vermont upon Vermont Yankee's continued operation and storage of spent nuclear fuel, including the requirement to obtain not only a new Certificate of Public Good, but also approval by Vermont's General Assembly.  In January 2012 the court entered judgment in Entergy's favor and specifically:

 

·                     Declared that Vermont's laws requiring Vermont Yankee to cease operation in March 2012 and prohibiting the storage of spent nuclear fuel from operation after that date, absent approval by the General Assembly, were based on radiological safety concerns and are preempted by the Atomic Energy Act;

·                     Permanently enjoined Vermont from enforcing these preempted requirements of the state's laws; and

·                     Permanently enjoined Vermont under the Commerce Clause of the United States Constitution from conditioning the issuance of a new Certificate of Public Good upon the existence of a below wholesale market power sale agreement with Vermont utilities or Vermont Yankee's selling power to Vermont utilities at rates below those available to wholesale customers in other states.

 

In February 2012 the Vermont defendants appealed the decision to the United States Court of Appeals for the Second Circuit. Vermont Yankee cross-appealed on two grounds: (1) the Federal Power Act alternatively preempts conditioning the issuance of a new Certificate of Public Good upon the existence of a below wholesale market power sale agreement with Vermont utilities or Vermont Yankee's selling power to Vermont utilities at rates below those available to wholesale customers in other states (an issue the District Court found unnecessary to decide in light of its ruling under the Commerce Clause); and (2) a request to make permanent the injunction pending appeal that the District Court entered on March 19, 2012 which prohibits Vermont from enforcing a statutory provision to compel Vermont Yankee to shut down because the cumulative total amount of spent fuel stored at the site exceeds the amount derived from the operation of the facility up to, but not beyond, March 21, 2012 (a provision the enforcement of which the January 2012 decision had not enjoined). The appeal and cross-appeal remain pending.

 

            In January 2012, Entergy filed a motion requesting that the VPSB grant, based on the existing record in its proceeding, Vermont Yankee's pending application for a new Certificate of Public Good.  Entergy subsequently filed another motion asking the VPSB to declare that title 3, section 814(b) of the Vermont statutes (3 V.S.A. § 814(b)) authorized Vermont Yankee to operate while the Certificate of Public Good proceeding was pending because Entergy had timely filed a petition for a new Certificate of Public Good that had not yet been decided.  In March 2012, the VPSB issued orders denying Entergy's motion with respect to 3 V.S.A. § 814(b) but stating that the order did not require Vermont Yankee to cease operations, denying Entergy's motion to issue a new Certificate of Public Good based on the existing record, determining to open a new docket and to create a new record to decide Vermont Yankee's request for a new Certificate of Public Good (without prejudice to any rights that Entergy might have under 3 V.S.A. § 814(b)), and directing Entergy to file an amended Certificate of Public Good petition that identified the specific approvals it was seeking in light of the district court's decision.  In April 2012, Entergy filed its amended Certificate of Public Good petition and in June 2012 filed its initial testimony in support of that petition.  The VPSB's current schedule provides for proceedings concerning that petition to continue until August 2013.

 

In September 2012, Entergy filed a petition asking the VPSB to issue a Certificate of Public Good allowing construction at Vermont Yankee for a diesel generator to provide power in the event of a station blackout. Vermont Yankee currently can obtain such power from the Vernon Dam. Due to changes instituted by ISO-New England, Vermont Yankee will no longer be able to rely upon the Vernon Dam in the event of a station blackout after August 31, 2013 and therefore plans to install a new diesel generator as a replacement power source. The VPSB requested and received comments on Entergy's September 2012 petition and its relationship to Entergy's other petition for a Certificate of Public Good, but has not yet provided a schedule for its consideration of the September 2012 petition.

 

 

Impairment

 

            Because of the uncertainty regarding the continued operation of Vermont Yankee, Entergy has tested the recoverability of the plant and related assets each quarter since the first quarter 2010.  The determination of recoverability is based on the probability-weighted undiscounted net cash flows expected to be generated by the plant and related assets.  Projected net cash flows primarily depend on the status of the pending legal and state regulatory matters, as well as projections of future revenues and expenses over the remaining life of the plant.  Prior to the first quarter 2012, the probability-weighted undiscounted net cash flows exceeded the carrying value of the Vermont Yankee plant and related assets.  The decline, however, in the overall energy market and the projected forward prices of power as of March 31, 2012, which are significant inputs in the determination of net cash flows, resulted in the probability-weighted undiscounted future cash flows being less than the asset group's carrying value.  Entergy performed a fair value analysis based on the income approach, a discounted cash flow method, to determine the amount of impairment. The estimated fair value of the plant and related assets at March 31, 2012 was $162.0 million, while the carrying value was $517.5 million.  Therefore, the assets were written down to their fair value and an impairment charge of $355.5 million ($223.5 million after-tax) was recognized.  The impairment charge is recorded as a separate line item in Entergy's consolidated statement of income for the nine months ended September 30, 2012, and is included within the results of the Entergy Wholesale Commodities segment.

 

            The estimate of fair value was based on the price that Entergy would expect to receive in a hypothetical sale of the Vermont Yankee plant and related assets to a market participant on March 31, 2012.  In order to determine this price, Entergy used significant observable inputs, including quoted forward power and gas prices, where available.  Significant unobservable inputs, such as projected long-term pre-tax operating margins (cash basis), and estimated weighted average costs of capital were also used in the estimation of fair value.  In addition, Entergy made certain assumptions regarding future tax deductions associated with the plant and related assets.  Based on the use of significant unobservable inputs, the fair value measurement for the entirety of the asset group, and for each type of asset within the asset group, is classified as Level 3 in the fair value hierarchy discussed in Note 8 to the financial statements.

 

The following table sets forth a description of significant unobservable inputs used in the valuation of the Vermont Yankee plant and related assets as of March 31, 2012:

 

 

Significant Unobservable Inputs

 

Range

Weighted Average

Weighted average cost of capital

7.5%-8.0%

7.8%

Long-term pre-tax operating margin (cash basis)

6.1%-7.8%

7.2%

 

Entergy's Accounting Policy group, which reports to the Chief Accounting Officer, was primarily responsible for determining the valuation of the Vermont Yankee plant and related assets, in consultation with external advisors. Accounting Policy obtained and reviewed information from other Entergy departments with expertise on the various inputs and assumptions that were necessary to calculate the fair value of the asset group.

Entergy Mississippi [Member]
 
Property, Plant And Equipment

NOTE 11. PROPERTY, PLANT, AND EQUIPMENT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Construction Expenditures in Accounts Payable

 

            Construction expenditures included in accounts payable at September 30, 2012 are $315.1 million for Entergy, $12.4 million for Entergy Arkansas, $47.2 million for Entergy Gulf States Louisiana, $159.5 million for Entergy Louisiana, $15 million for Entergy Mississippi, $15.3 million for Entergy New Orleans, $3.5 million for Entergy Texas, and $24.8 million for System Energy. Construction expenditures included in accounts payable at December 31, 2011 are $171.2 million for Entergy, $14.1 million for Entergy Arkansas, $13.7 million for Entergy Gulf States Louisiana, $27 million for Entergy Louisiana, $4.3 million for Entergy Mississippi, $3.6 million for Entergy New Orleans, $4.3 million for Entergy Texas, and $32.9 million for System Energy.

 


Vermont Yankee

 

            In March 2011 the NRC renewed Vermont Yankee's operating license for an additional 20 years.  The renewed operating license expires in March 2032.  In May 2011 the Vermont Department of Public Service and the New England Coalition petitioned the United States Court of Appeals for the D.C. Circuit seeking judicial review of the NRC's issuance of the renewed operating license, alleging that the license had been issued without a valid and effective water quality certification under Section 401 of the Clean Water Act.  Entergy Nuclear Vermont Yankee and Entergy Nuclear Operations, Inc. intervened in the proceeding.  In June 2012 the Court of Appeals denied the appeal on the ground that the petitioners had failed to exhaust their administrative remedies before the NRC.  The time for seeking further judicial review of the NRC's issuance of Vermont Yankee's renewed operating license has expired.

 

            Vermont Yankee also is operating under a Certificate of Public Good from the State of Vermont that was scheduled to expire in March 2012, but has an application pending before the Vermont Public Service Board (VPSB) for a new Certificate of Public Good for operation until March 2032.  In April 2011, Entergy Nuclear Vermont Yankee and Entergy Nuclear Operations, the owner and operator respectively of Vermont Yankee, filed suit in the United States District Court for the District of Vermont.  The suit challenged certain conditions imposed by Vermont upon Vermont Yankee's continued operation and storage of spent nuclear fuel, including the requirement to obtain not only a new Certificate of Public Good, but also approval by Vermont's General Assembly.  In January 2012 the court entered judgment in Entergy's favor and specifically:

 

·                     Declared that Vermont's laws requiring Vermont Yankee to cease operation in March 2012 and prohibiting the storage of spent nuclear fuel from operation after that date, absent approval by the General Assembly, were based on radiological safety concerns and are preempted by the Atomic Energy Act;

·                     Permanently enjoined Vermont from enforcing these preempted requirements of the state's laws; and

·                     Permanently enjoined Vermont under the Commerce Clause of the United States Constitution from conditioning the issuance of a new Certificate of Public Good upon the existence of a below wholesale market power sale agreement with Vermont utilities or Vermont Yankee's selling power to Vermont utilities at rates below those available to wholesale customers in other states.

 

In February 2012 the Vermont defendants appealed the decision to the United States Court of Appeals for the Second Circuit. Vermont Yankee cross-appealed on two grounds: (1) the Federal Power Act alternatively preempts conditioning the issuance of a new Certificate of Public Good upon the existence of a below wholesale market power sale agreement with Vermont utilities or Vermont Yankee's selling power to Vermont utilities at rates below those available to wholesale customers in other states (an issue the District Court found unnecessary to decide in light of its ruling under the Commerce Clause); and (2) a request to make permanent the injunction pending appeal that the District Court entered on March 19, 2012 which prohibits Vermont from enforcing a statutory provision to compel Vermont Yankee to shut down because the cumulative total amount of spent fuel stored at the site exceeds the amount derived from the operation of the facility up to, but not beyond, March 21, 2012 (a provision the enforcement of which the January 2012 decision had not enjoined). The appeal and cross-appeal remain pending.

 

            In January 2012, Entergy filed a motion requesting that the VPSB grant, based on the existing record in its proceeding, Vermont Yankee's pending application for a new Certificate of Public Good.  Entergy subsequently filed another motion asking the VPSB to declare that title 3, section 814(b) of the Vermont statutes (3 V.S.A. § 814(b)) authorized Vermont Yankee to operate while the Certificate of Public Good proceeding was pending because Entergy had timely filed a petition for a new Certificate of Public Good that had not yet been decided.  In March 2012, the VPSB issued orders denying Entergy's motion with respect to 3 V.S.A. § 814(b) but stating that the order did not require Vermont Yankee to cease operations, denying Entergy's motion to issue a new Certificate of Public Good based on the existing record, determining to open a new docket and to create a new record to decide Vermont Yankee's request for a new Certificate of Public Good (without prejudice to any rights that Entergy might have under 3 V.S.A. § 814(b)), and directing Entergy to file an amended Certificate of Public Good petition that identified the specific approvals it was seeking in light of the district court's decision.  In April 2012, Entergy filed its amended Certificate of Public Good petition and in June 2012 filed its initial testimony in support of that petition.  The VPSB's current schedule provides for proceedings concerning that petition to continue until August 2013.

 

In September 2012, Entergy filed a petition asking the VPSB to issue a Certificate of Public Good allowing construction at Vermont Yankee for a diesel generator to provide power in the event of a station blackout. Vermont Yankee currently can obtain such power from the Vernon Dam. Due to changes instituted by ISO-New England, Vermont Yankee will no longer be able to rely upon the Vernon Dam in the event of a station blackout after August 31, 2013 and therefore plans to install a new diesel generator as a replacement power source. The VPSB requested and received comments on Entergy's September 2012 petition and its relationship to Entergy's other petition for a Certificate of Public Good, but has not yet provided a schedule for its consideration of the September 2012 petition.

 

 

Impairment

 

            Because of the uncertainty regarding the continued operation of Vermont Yankee, Entergy has tested the recoverability of the plant and related assets each quarter since the first quarter 2010.  The determination of recoverability is based on the probability-weighted undiscounted net cash flows expected to be generated by the plant and related assets.  Projected net cash flows primarily depend on the status of the pending legal and state regulatory matters, as well as projections of future revenues and expenses over the remaining life of the plant.  Prior to the first quarter 2012, the probability-weighted undiscounted net cash flows exceeded the carrying value of the Vermont Yankee plant and related assets.  The decline, however, in the overall energy market and the projected forward prices of power as of March 31, 2012, which are significant inputs in the determination of net cash flows, resulted in the probability-weighted undiscounted future cash flows being less than the asset group's carrying value.  Entergy performed a fair value analysis based on the income approach, a discounted cash flow method, to determine the amount of impairment. The estimated fair value of the plant and related assets at March 31, 2012 was $162.0 million, while the carrying value was $517.5 million.  Therefore, the assets were written down to their fair value and an impairment charge of $355.5 million ($223.5 million after-tax) was recognized.  The impairment charge is recorded as a separate line item in Entergy's consolidated statement of income for the nine months ended September 30, 2012, and is included within the results of the Entergy Wholesale Commodities segment.

 

            The estimate of fair value was based on the price that Entergy would expect to receive in a hypothetical sale of the Vermont Yankee plant and related assets to a market participant on March 31, 2012.  In order to determine this price, Entergy used significant observable inputs, including quoted forward power and gas prices, where available.  Significant unobservable inputs, such as projected long-term pre-tax operating margins (cash basis), and estimated weighted average costs of capital were also used in the estimation of fair value.  In addition, Entergy made certain assumptions regarding future tax deductions associated with the plant and related assets.  Based on the use of significant unobservable inputs, the fair value measurement for the entirety of the asset group, and for each type of asset within the asset group, is classified as Level 3 in the fair value hierarchy discussed in Note 8 to the financial statements.

 

The following table sets forth a description of significant unobservable inputs used in the valuation of the Vermont Yankee plant and related assets as of March 31, 2012:

 

 

Significant Unobservable Inputs

 

Range

Weighted Average

Weighted average cost of capital

7.5%-8.0%

7.8%

Long-term pre-tax operating margin (cash basis)

6.1%-7.8%

7.2%

 

Entergy's Accounting Policy group, which reports to the Chief Accounting Officer, was primarily responsible for determining the valuation of the Vermont Yankee plant and related assets, in consultation with external advisors. Accounting Policy obtained and reviewed information from other Entergy departments with expertise on the various inputs and assumptions that were necessary to calculate the fair value of the asset group.

Entergy New Orleans
 
Property, Plant And Equipment

NOTE 11. PROPERTY, PLANT, AND EQUIPMENT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Construction Expenditures in Accounts Payable

 

            Construction expenditures included in accounts payable at September 30, 2012 are $315.1 million for Entergy, $12.4 million for Entergy Arkansas, $47.2 million for Entergy Gulf States Louisiana, $159.5 million for Entergy Louisiana, $15 million for Entergy Mississippi, $15.3 million for Entergy New Orleans, $3.5 million for Entergy Texas, and $24.8 million for System Energy. Construction expenditures included in accounts payable at December 31, 2011 are $171.2 million for Entergy, $14.1 million for Entergy Arkansas, $13.7 million for Entergy Gulf States Louisiana, $27 million for Entergy Louisiana, $4.3 million for Entergy Mississippi, $3.6 million for Entergy New Orleans, $4.3 million for Entergy Texas, and $32.9 million for System Energy.

 


Vermont Yankee

 

            In March 2011 the NRC renewed Vermont Yankee's operating license for an additional 20 years.  The renewed operating license expires in March 2032.  In May 2011 the Vermont Department of Public Service and the New England Coalition petitioned the United States Court of Appeals for the D.C. Circuit seeking judicial review of the NRC's issuance of the renewed operating license, alleging that the license had been issued without a valid and effective water quality certification under Section 401 of the Clean Water Act.  Entergy Nuclear Vermont Yankee and Entergy Nuclear Operations, Inc. intervened in the proceeding.  In June 2012 the Court of Appeals denied the appeal on the ground that the petitioners had failed to exhaust their administrative remedies before the NRC.  The time for seeking further judicial review of the NRC's issuance of Vermont Yankee's renewed operating license has expired.

 

            Vermont Yankee also is operating under a Certificate of Public Good from the State of Vermont that was scheduled to expire in March 2012, but has an application pending before the Vermont Public Service Board (VPSB) for a new Certificate of Public Good for operation until March 2032.  In April 2011, Entergy Nuclear Vermont Yankee and Entergy Nuclear Operations, the owner and operator respectively of Vermont Yankee, filed suit in the United States District Court for the District of Vermont.  The suit challenged certain conditions imposed by Vermont upon Vermont Yankee's continued operation and storage of spent nuclear fuel, including the requirement to obtain not only a new Certificate of Public Good, but also approval by Vermont's General Assembly.  In January 2012 the court entered judgment in Entergy's favor and specifically:

 

·                     Declared that Vermont's laws requiring Vermont Yankee to cease operation in March 2012 and prohibiting the storage of spent nuclear fuel from operation after that date, absent approval by the General Assembly, were based on radiological safety concerns and are preempted by the Atomic Energy Act;

·                     Permanently enjoined Vermont from enforcing these preempted requirements of the state's laws; and

·                     Permanently enjoined Vermont under the Commerce Clause of the United States Constitution from conditioning the issuance of a new Certificate of Public Good upon the existence of a below wholesale market power sale agreement with Vermont utilities or Vermont Yankee's selling power to Vermont utilities at rates below those available to wholesale customers in other states.

 

In February 2012 the Vermont defendants appealed the decision to the United States Court of Appeals for the Second Circuit. Vermont Yankee cross-appealed on two grounds: (1) the Federal Power Act alternatively preempts conditioning the issuance of a new Certificate of Public Good upon the existence of a below wholesale market power sale agreement with Vermont utilities or Vermont Yankee's selling power to Vermont utilities at rates below those available to wholesale customers in other states (an issue the District Court found unnecessary to decide in light of its ruling under the Commerce Clause); and (2) a request to make permanent the injunction pending appeal that the District Court entered on March 19, 2012 which prohibits Vermont from enforcing a statutory provision to compel Vermont Yankee to shut down because the cumulative total amount of spent fuel stored at the site exceeds the amount derived from the operation of the facility up to, but not beyond, March 21, 2012 (a provision the enforcement of which the January 2012 decision had not enjoined). The appeal and cross-appeal remain pending.

 

            In January 2012, Entergy filed a motion requesting that the VPSB grant, based on the existing record in its proceeding, Vermont Yankee's pending application for a new Certificate of Public Good.  Entergy subsequently filed another motion asking the VPSB to declare that title 3, section 814(b) of the Vermont statutes (3 V.S.A. § 814(b)) authorized Vermont Yankee to operate while the Certificate of Public Good proceeding was pending because Entergy had timely filed a petition for a new Certificate of Public Good that had not yet been decided.  In March 2012, the VPSB issued orders denying Entergy's motion with respect to 3 V.S.A. § 814(b) but stating that the order did not require Vermont Yankee to cease operations, denying Entergy's motion to issue a new Certificate of Public Good based on the existing record, determining to open a new docket and to create a new record to decide Vermont Yankee's request for a new Certificate of Public Good (without prejudice to any rights that Entergy might have under 3 V.S.A. § 814(b)), and directing Entergy to file an amended Certificate of Public Good petition that identified the specific approvals it was seeking in light of the district court's decision.  In April 2012, Entergy filed its amended Certificate of Public Good petition and in June 2012 filed its initial testimony in support of that petition.  The VPSB's current schedule provides for proceedings concerning that petition to continue until August 2013.

 

In September 2012, Entergy filed a petition asking the VPSB to issue a Certificate of Public Good allowing construction at Vermont Yankee for a diesel generator to provide power in the event of a station blackout. Vermont Yankee currently can obtain such power from the Vernon Dam. Due to changes instituted by ISO-New England, Vermont Yankee will no longer be able to rely upon the Vernon Dam in the event of a station blackout after August 31, 2013 and therefore plans to install a new diesel generator as a replacement power source. The VPSB requested and received comments on Entergy's September 2012 petition and its relationship to Entergy's other petition for a Certificate of Public Good, but has not yet provided a schedule for its consideration of the September 2012 petition.

 

Impairment

 

            Because of the uncertainty regarding the continued operation of Vermont Yankee, Entergy has tested the recoverability of the plant and related assets each quarter since the first quarter 2010.  The determination of recoverability is based on the probability-weighted undiscounted net cash flows expected to be generated by the plant and related assets.  Projected net cash flows primarily depend on the status of the pending legal and state regulatory matters, as well as projections of future revenues and expenses over the remaining life of the plant.  Prior to the first quarter 2012, the probability-weighted undiscounted net cash flows exceeded the carrying value of the Vermont Yankee plant and related assets.  The decline, however, in the overall energy market and the projected forward prices of power as of March 31, 2012, which are significant inputs in the determination of net cash flows, resulted in the probability-weighted undiscounted future cash flows being less than the asset group's carrying value.  Entergy performed a fair value analysis based on the income approach, a discounted cash flow method, to determine the amount of impairment. The estimated fair value of the plant and related assets at March 31, 2012 was $162.0 million, while the carrying value was $517.5 million.  Therefore, the assets were written down to their fair value and an impairment charge of $355.5 million ($223.5 million after-tax) was recognized.  The impairment charge is recorded as a separate line item in Entergy's consolidated statement of income for the nine months ended September 30, 2012, and is included within the results of the Entergy Wholesale Commodities segment.

 

            The estimate of fair value was based on the price that Entergy would expect to receive in a hypothetical sale of the Vermont Yankee plant and related assets to a market participant on March 31, 2012.  In order to determine this price, Entergy used significant observable inputs, including quoted forward power and gas prices, where available.  Significant unobservable inputs, such as projected long-term pre-tax operating margins (cash basis), and estimated weighted average costs of capital were also used in the estimation of fair value.  In addition, Entergy made certain assumptions regarding future tax deductions associated with the plant and related assets.  Based on the use of significant unobservable inputs, the fair value measurement for the entirety of the asset group, and for each type of asset within the asset group, is classified as Level 3 in the fair value hierarchy discussed in Note 8 to the financial statements.

 

The following table sets forth a description of significant unobservable inputs used in the valuation of the Vermont Yankee plant and related assets as of March 31, 2012:

 

 

Significant Unobservable Inputs

 

Range

Weighted Average

Weighted average cost of capital

7.5%-8.0%

7.8%

Long-term pre-tax operating margin (cash basis)

6.1%-7.8%

7.2%

 

Entergy's Accounting Policy group, which reports to the Chief Accounting Officer, was primarily responsible for determining the valuation of the Vermont Yankee plant and related assets, in consultation with external advisors. Accounting Policy obtained and reviewed information from other Entergy departments with expertise on the various inputs and assumptions that were necessary to calculate the fair value of the asset group.

Entergy Texas [Member]
 
Property, Plant And Equipment

NOTE 11. PROPERTY, PLANT, AND EQUIPMENT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Construction Expenditures in Accounts Payable

 

            Construction expenditures included in accounts payable at September 30, 2012 are $315.1 million for Entergy, $12.4 million for Entergy Arkansas, $47.2 million for Entergy Gulf States Louisiana, $159.5 million for Entergy Louisiana, $15 million for Entergy Mississippi, $15.3 million for Entergy New Orleans, $3.5 million for Entergy Texas, and $24.8 million for System Energy. Construction expenditures included in accounts payable at December 31, 2011 are $171.2 million for Entergy, $14.1 million for Entergy Arkansas, $13.7 million for Entergy Gulf States Louisiana, $27 million for Entergy Louisiana, $4.3 million for Entergy Mississippi, $3.6 million for Entergy New Orleans, $4.3 million for Entergy Texas, and $32.9 million for System Energy.

 


Vermont Yankee

 

            In March 2011 the NRC renewed Vermont Yankee's operating license for an additional 20 years.  The renewed operating license expires in March 2032.  In May 2011 the Vermont Department of Public Service and the New England Coalition petitioned the United States Court of Appeals for the D.C. Circuit seeking judicial review of the NRC's issuance of the renewed operating license, alleging that the license had been issued without a valid and effective water quality certification under Section 401 of the Clean Water Act.  Entergy Nuclear Vermont Yankee and Entergy Nuclear Operations, Inc. intervened in the proceeding.  In June 2012 the Court of Appeals denied the appeal on the ground that the petitioners had failed to exhaust their administrative remedies before the NRC.  The time for seeking further judicial review of the NRC's issuance of Vermont Yankee's renewed operating license has expired.

 

            Vermont Yankee also is operating under a Certificate of Public Good from the State of Vermont that was scheduled to expire in March 2012, but has an application pending before the Vermont Public Service Board (VPSB) for a new Certificate of Public Good for operation until March 2032.  In April 2011, Entergy Nuclear Vermont Yankee and Entergy Nuclear Operations, the owner and operator respectively of Vermont Yankee, filed suit in the United States District Court for the District of Vermont.  The suit challenged certain conditions imposed by Vermont upon Vermont Yankee's continued operation and storage of spent nuclear fuel, including the requirement to obtain not only a new Certificate of Public Good, but also approval by Vermont's General Assembly.  In January 2012 the court entered judgment in Entergy's favor and specifically:

 

·                     Declared that Vermont's laws requiring Vermont Yankee to cease operation in March 2012 and prohibiting the storage of spent nuclear fuel from operation after that date, absent approval by the General Assembly, were based on radiological safety concerns and are preempted by the Atomic Energy Act;

·                     Permanently enjoined Vermont from enforcing these preempted requirements of the state's laws; and

·                     Permanently enjoined Vermont under the Commerce Clause of the United States Constitution from conditioning the issuance of a new Certificate of Public Good upon the existence of a below wholesale market power sale agreement with Vermont utilities or Vermont Yankee's selling power to Vermont utilities at rates below those available to wholesale customers in other states.

 

In February 2012 the Vermont defendants appealed the decision to the United States Court of Appeals for the Second Circuit. Vermont Yankee cross-appealed on two grounds: (1) the Federal Power Act alternatively preempts conditioning the issuance of a new Certificate of Public Good upon the existence of a below wholesale market power sale agreement with Vermont utilities or Vermont Yankee's selling power to Vermont utilities at rates below those available to wholesale customers in other states (an issue the District Court found unnecessary to decide in light of its ruling under the Commerce Clause); and (2) a request to make permanent the injunction pending appeal that the District Court entered on March 19, 2012 which prohibits Vermont from enforcing a statutory provision to compel Vermont Yankee to shut down because the cumulative total amount of spent fuel stored at the site exceeds the amount derived from the operation of the facility up to, but not beyond, March 21, 2012 (a provision the enforcement of which the January 2012 decision had not enjoined). The appeal and cross-appeal remain pending.

 

            In January 2012, Entergy filed a motion requesting that the VPSB grant, based on the existing record in its proceeding, Vermont Yankee's pending application for a new Certificate of Public Good.  Entergy subsequently filed another motion asking the VPSB to declare that title 3, section 814(b) of the Vermont statutes (3 V.S.A. § 814(b)) authorized Vermont Yankee to operate while the Certificate of Public Good proceeding was pending because Entergy had timely filed a petition for a new Certificate of Public Good that had not yet been decided.  In March 2012, the VPSB issued orders denying Entergy's motion with respect to 3 V.S.A. § 814(b) but stating that the order did not require Vermont Yankee to cease operations, denying Entergy's motion to issue a new Certificate of Public Good based on the existing record, determining to open a new docket and to create a new record to decide Vermont Yankee's request for a new Certificate of Public Good (without prejudice to any rights that Entergy might have under 3 V.S.A. § 814(b)), and directing Entergy to file an amended Certificate of Public Good petition that identified the specific approvals it was seeking in light of the district court's decision.  In April 2012, Entergy filed its amended Certificate of Public Good petition and in June 2012 filed its initial testimony in support of that petition.  The VPSB's current schedule provides for proceedings concerning that petition to continue until August 2013.

 

In September 2012, Entergy filed a petition asking the VPSB to issue a Certificate of Public Good allowing construction at Vermont Yankee for a diesel generator to provide power in the event of a station blackout. Vermont Yankee currently can obtain such power from the Vernon Dam. Due to changes instituted by ISO-New England, Vermont Yankee will no longer be able to rely upon the Vernon Dam in the event of a station blackout after August 31, 2013 and therefore plans to install a new diesel generator as a replacement power source. The VPSB requested and received comments on Entergy's September 2012 petition and its relationship to Entergy's other petition for a Certificate of Public Good, but has not yet provided a schedule for its consideration of the September 2012 petition.

 

Impairment

 

            Because of the uncertainty regarding the continued operation of Vermont Yankee, Entergy has tested the recoverability of the plant and related assets each quarter since the first quarter 2010.  The determination of recoverability is based on the probability-weighted undiscounted net cash flows expected to be generated by the plant and related assets.  Projected net cash flows primarily depend on the status of the pending legal and state regulatory matters, as well as projections of future revenues and expenses over the remaining life of the plant.  Prior to the first quarter 2012, the probability-weighted undiscounted net cash flows exceeded the carrying value of the Vermont Yankee plant and related assets.  The decline, however, in the overall energy market and the projected forward prices of power as of March 31, 2012, which are significant inputs in the determination of net cash flows, resulted in the probability-weighted undiscounted future cash flows being less than the asset group's carrying value.  Entergy performed a fair value analysis based on the income approach, a discounted cash flow method, to determine the amount of impairment. The estimated fair value of the plant and related assets at March 31, 2012 was $162.0 million, while the carrying value was $517.5 million.  Therefore, the assets were written down to their fair value and an impairment charge of $355.5 million ($223.5 million after-tax) was recognized.  The impairment charge is recorded as a separate line item in Entergy's consolidated statement of income for the nine months ended September 30, 2012, and is included within the results of the Entergy Wholesale Commodities segment.

 

            The estimate of fair value was based on the price that Entergy would expect to receive in a hypothetical sale of the Vermont Yankee plant and related assets to a market participant on March 31, 2012.  In order to determine this price, Entergy used significant observable inputs, including quoted forward power and gas prices, where available.  Significant unobservable inputs, such as projected long-term pre-tax operating margins (cash basis), and estimated weighted average costs of capital were also used in the estimation of fair value.  In addition, Entergy made certain assumptions regarding future tax deductions associated with the plant and related assets.  Based on the use of significant unobservable inputs, the fair value measurement for the entirety of the asset group, and for each type of asset within the asset group, is classified as Level 3 in the fair value hierarchy discussed in Note 8 to the financial statements.

 

The following table sets forth a description of significant unobservable inputs used in the valuation of the Vermont Yankee plant and related assets as of March 31, 2012:

 

 

Significant Unobservable Inputs

 

Range

Weighted Average

Weighted average cost of capital

7.5%-8.0%

7.8%

Long-term pre-tax operating margin (cash basis)

6.1%-7.8%

7.2%

 

Entergy's Accounting Policy group, which reports to the Chief Accounting Officer, was primarily responsible for determining the valuation of the Vermont Yankee plant and related assets, in consultation with external advisors. Accounting Policy obtained and reviewed information from other Entergy departments with expertise on the various inputs and assumptions that were necessary to calculate the fair value of the asset group.

 

System Energy [Member]
 
Property, Plant And Equipment

NOTE 11. PROPERTY, PLANT, AND EQUIPMENT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Construction Expenditures in Accounts Payable

 

            Construction expenditures included in accounts payable at September 30, 2012 are $315.1 million for Entergy, $12.4 million for Entergy Arkansas, $47.2 million for Entergy Gulf States Louisiana, $159.5 million for Entergy Louisiana, $15 million for Entergy Mississippi, $15.3 million for Entergy New Orleans, $3.5 million for Entergy Texas, and $24.8 million for System Energy. Construction expenditures included in accounts payable at December 31, 2011 are $171.2 million for Entergy, $14.1 million for Entergy Arkansas, $13.7 million for Entergy Gulf States Louisiana, $27 million for Entergy Louisiana, $4.3 million for Entergy Mississippi, $3.6 million for Entergy New Orleans, $4.3 million for Entergy Texas, and $32.9 million for System Energy.

 


Vermont Yankee

 

            In March 2011 the NRC renewed Vermont Yankee's operating license for an additional 20 years.  The renewed operating license expires in March 2032.  In May 2011 the Vermont Department of Public Service and the New England Coalition petitioned the United States Court of Appeals for the D.C. Circuit seeking judicial review of the NRC's issuance of the renewed operating license, alleging that the license had been issued without a valid and effective water quality certification under Section 401 of the Clean Water Act.  Entergy Nuclear Vermont Yankee and Entergy Nuclear Operations, Inc. intervened in the proceeding.  In June 2012 the Court of Appeals denied the appeal on the ground that the petitioners had failed to exhaust their administrative remedies before the NRC.  The time for seeking further judicial review of the NRC's issuance of Vermont Yankee's renewed operating license has expired.

 

            Vermont Yankee also is operating under a Certificate of Public Good from the State of Vermont that was scheduled to expire in March 2012, but has an application pending before the Vermont Public Service Board (VPSB) for a new Certificate of Public Good for operation until March 2032.  In April 2011, Entergy Nuclear Vermont Yankee and Entergy Nuclear Operations, the owner and operator respectively of Vermont Yankee, filed suit in the United States District Court for the District of Vermont.  The suit challenged certain conditions imposed by Vermont upon Vermont Yankee's continued operation and storage of spent nuclear fuel, including the requirement to obtain not only a new Certificate of Public Good, but also approval by Vermont's General Assembly.  In January 2012 the court entered judgment in Entergy's favor and specifically:

 

·                     Declared that Vermont's laws requiring Vermont Yankee to cease operation in March 2012 and prohibiting the storage of spent nuclear fuel from operation after that date, absent approval by the General Assembly, were based on radiological safety concerns and are preempted by the Atomic Energy Act;

·                     Permanently enjoined Vermont from enforcing these preempted requirements of the state's laws; and

·                     Permanently enjoined Vermont under the Commerce Clause of the United States Constitution from conditioning the issuance of a new Certificate of Public Good upon the existence of a below wholesale market power sale agreement with Vermont utilities or Vermont Yankee's selling power to Vermont utilities at rates below those available to wholesale customers in other states.

 

In February 2012 the Vermont defendants appealed the decision to the United States Court of Appeals for the Second Circuit. Vermont Yankee cross-appealed on two grounds: (1) the Federal Power Act alternatively preempts conditioning the issuance of a new Certificate of Public Good upon the existence of a below wholesale market power sale agreement with Vermont utilities or Vermont Yankee's selling power to Vermont utilities at rates below those available to wholesale customers in other states (an issue the District Court found unnecessary to decide in light of its ruling under the Commerce Clause); and (2) a request to make permanent the injunction pending appeal that the District Court entered on March 19, 2012 which prohibits Vermont from enforcing a statutory provision to compel Vermont Yankee to shut down because the cumulative total amount of spent fuel stored at the site exceeds the amount derived from the operation of the facility up to, but not beyond, March 21, 2012 (a provision the enforcement of which the January 2012 decision had not enjoined). The appeal and cross-appeal remain pending.

 

            In January 2012, Entergy filed a motion requesting that the VPSB grant, based on the existing record in its proceeding, Vermont Yankee's pending application for a new Certificate of Public Good.  Entergy subsequently filed another motion asking the VPSB to declare that title 3, section 814(b) of the Vermont statutes (3 V.S.A. § 814(b)) authorized Vermont Yankee to operate while the Certificate of Public Good proceeding was pending because Entergy had timely filed a petition for a new Certificate of Public Good that had not yet been decided.  In March 2012, the VPSB issued orders denying Entergy's motion with respect to 3 V.S.A. § 814(b) but stating that the order did not require Vermont Yankee to cease operations, denying Entergy's motion to issue a new Certificate of Public Good based on the existing record, determining to open a new docket and to create a new record to decide Vermont Yankee's request for a new Certificate of Public Good (without prejudice to any rights that Entergy might have under 3 V.S.A. § 814(b)), and directing Entergy to file an amended Certificate of Public Good petition that identified the specific approvals it was seeking in light of the district court's decision.  In April 2012, Entergy filed its amended Certificate of Public Good petition and in June 2012 filed its initial testimony in support of that petition.  The VPSB's current schedule provides for proceedings concerning that petition to continue until August 2013.

 

In September 2012, Entergy filed a petition asking the VPSB to issue a Certificate of Public Good allowing construction at Vermont Yankee for a diesel generator to provide power in the event of a station blackout. Vermont Yankee currently can obtain such power from the Vernon Dam. Due to changes instituted by ISO-New England, Vermont Yankee will no longer be able to rely upon the Vernon Dam in the event of a station blackout after August 31, 2013 and therefore plans to install a new diesel generator as a replacement power source. The VPSB requested and received comments on Entergy's September 2012 petition and its relationship to Entergy's other petition for a Certificate of Public Good, but has not yet provided a schedule for its consideration of the September 2012 petition.

 

Impairment

 

            Because of the uncertainty regarding the continued operation of Vermont Yankee, Entergy has tested the recoverability of the plant and related assets each quarter since the first quarter 2010.  The determination of recoverability is based on the probability-weighted undiscounted net cash flows expected to be generated by the plant and related assets.  Projected net cash flows primarily depend on the status of the pending legal and state regulatory matters, as well as projections of future revenues and expenses over the remaining life of the plant.  Prior to the first quarter 2012, the probability-weighted undiscounted net cash flows exceeded the carrying value of the Vermont Yankee plant and related assets.  The decline, however, in the overall energy market and the projected forward prices of power as of March 31, 2012, which are significant inputs in the determination of net cash flows, resulted in the probability-weighted undiscounted future cash flows being less than the asset group's carrying value.  Entergy performed a fair value analysis based on the income approach, a discounted cash flow method, to determine the amount of impairment. The estimated fair value of the plant and related assets at March 31, 2012 was $162.0 million, while the carrying value was $517.5 million.  Therefore, the assets were written down to their fair value and an impairment charge of $355.5 million ($223.5 million after-tax) was recognized.  The impairment charge is recorded as a separate line item in Entergy's consolidated statement of income for the nine months ended September 30, 2012, and is included within the results of the Entergy Wholesale Commodities segment.

 

            The estimate of fair value was based on the price that Entergy would expect to receive in a hypothetical sale of the Vermont Yankee plant and related assets to a market participant on March 31, 2012.  In order to determine this price, Entergy used significant observable inputs, including quoted forward power and gas prices, where available.  Significant unobservable inputs, such as projected long-term pre-tax operating margins (cash basis), and estimated weighted average costs of capital were also used in the estimation of fair value.  In addition, Entergy made certain assumptions regarding future tax deductions associated with the plant and related assets.  Based on the use of significant unobservable inputs, the fair value measurement for the entirety of the asset group, and for each type of asset within the asset group, is classified as Level 3 in the fair value hierarchy discussed in Note 8 to the financial statements.

 

The following table sets forth a description of significant unobservable inputs used in the valuation of the Vermont Yankee plant and related assets as of March 31, 2012:

 

 

Significant Unobservable Inputs

 

Range

Weighted Average

Weighted average cost of capital

7.5%-8.0%

7.8%

Long-term pre-tax operating margin (cash basis)

6.1%-7.8%

7.2%

 

Entergy's Accounting Policy group, which reports to the Chief Accounting Officer, was primarily responsible for determining the valuation of the Vermont Yankee plant and related assets, in consultation with external advisors. Accounting Policy obtained and reviewed information from other Entergy departments with expertise on the various inputs and assumptions that were necessary to calculate the fair value of the asset group.