XML 34 R13.htm IDEA: XBRL DOCUMENT v3.20.4
Regulatory Matters
12 Months Ended
Dec. 31, 2020
Regulated Operations [Abstract]  
Regulatory Matters [Text Block] REGULATORY MATTERS
Electric Rates. Entities within our Regulated Operations segment file for periodic rate revisions with the MPUC, PSCW or FERC. As authorized by the MPUC, Minnesota Power also recognizes revenue under cost recovery riders for transmission, renewable and environmental investments and expenditures. (See Transmission Cost Recovery Rider, Renewable Cost Recovery Rider and Environmental Improvement Rider.) Revenue from cost recovery riders was $29.9 million in 2020 ($31.8 million in 2019; $103.8 million in 2018). With the implementation of final rates in Minnesota Power’s 2016 general rate case in December 2018, certain revenue previously recognized under cost recovery riders was incorporated into base rates.

2020 Minnesota General Rate Case. In November 2019, Minnesota Power filed a retail rate increase request with the MPUC seeking an average increase of approximately 10.6 percent for retail customers. The rate filing sought a return on equity of 10.05 percent and a 53.81 percent equity ratio. On an annualized basis, the requested final rate increase would have generated approximately $66 million in additional revenue. In orders dated December 23, 2019, the MPUC accepted the filing as complete and authorized an annual interim rate increase of $36.1 million beginning January 1, 2020.

On April 23, 2020, Minnesota Power filed a request with the MPUC that proposed a resolution of Minnesota Power’s 2020 general rate case. Key components of our proposal included removing the power marketing margin credit in base rates and reflecting actual power marketing margins in the fuel adjustment clause effective May 1, 2020; refunding to customers interim rates collected through April 2020; increasing customer rates 4.1 percent compared to the 5.8 percent increase reflected in interim rates; and a provision that Minnesota Power would not file another rate case until at least November 1, 2021, unless certain events occur. In an order dated June 30, 2020, the MPUC approved Minnesota Power’s petition and proposal to resolve and withdraw the general rate case. Effective May 1, 2020, customer rates were set at an increase of 4.1 percent with the removal of the power marketing margin credit from base rates. Actual power marketing margins will be reflected in the fuel adjustment clause. Reserves for interim rates of $11.7 million were recorded in the second quarter of 2020 and refunded in the third and fourth quarters of 2020.

FERC-Approved Wholesale Rates. Minnesota Power has 15 non-affiliated municipal customers in Minnesota. SWL&P is a Wisconsin utility and a wholesale customer of Minnesota Power. All wholesale contracts include a termination clause requiring a three-year notice to terminate.
NOTE 4. REGULATORY MATTERS (Continued)
Electric Rates (Continued)

Minnesota Power’s wholesale electric contract with the Nashwauk Public Utilities Commission was extended in October 2020 and is effective through December 31, 2037. The wholesale electric service contract with SWL&P is effective through February 28, 2024. Under the agreement with SWL&P, no termination notice has been given. The rates included in these two contracts are set each July 1 based on a cost-based formula methodology, using estimated costs and a rate of return that is equal to Minnesota Power’s authorized rate of return for Minnesota retail customers. The formula-based rate methodology also provides for a yearly true-up calculation for actual costs incurred.

Minnesota Power’s wholesale electric contracts with 14 other municipal customers are effective through varying dates ranging from 2024 through 2029. No termination notices may be given prior to three years before maturity. These contracts had fixed capacity charges through 2018; beginning in 2019, the capacity charge is determined using a cost-based formula methodology with limits on the annual change from the previous year’s capacity charge. The base energy charge for each year of the contract term is set each January 1, subject to monthly adjustment, and is determined using a cost-based formula methodology.

The contract with a former municipal customer expired in June 2019. Minnesota Power historically provided approximately 29 MW of average monthly demand to this customer.

Transmission Cost Recovery Rider. Minnesota Power has an approved cost recovery rider in place for certain transmission investments and expenditures. In an order dated December 3, 2020, the MPUC approved Minnesota Power’s request filed in July 2019 for updated customer billing rates allowing Minnesota Power to charge retail customers on a current basis for the costs of constructing certain transmission facilities plus a return on the capital invested. On December 28, 2020, Minnesota Power filed a petition seeking MPUC approval to update customer billing rates for additional investments made for the GNTL.

Renewable Cost Recovery Rider. Minnesota Power has an approved cost recovery rider for certain renewable investments and expenditures. The cost recovery rider allows Minnesota Power to charge retail customers on a current basis for the costs of certain renewable investments plus a return on the capital invested. Updated customer billing rates for the renewable cost recovery rider were approved by the MPUC in a December 10, 2020 order.

Minnesota Power also has approval for current cost recovery of investments and expenditures related to compliance with the Minnesota Solar Energy Standard. (See Minnesota Solar Energy Standard.) On June 30, 2020, Minnesota Power filed a petition seeking MPUC approval of a customer billing rate for solar costs related to investments and expenditures for meeting the state of Minnesota’s solar energy standard.

Environmental Improvement Rider. Minnesota Power has an approved environmental improvement rider for investments and expenditures related to the implementation of the Boswell Unit 4 mercury emissions reduction plan completed in 2015. Updated customer billing rates for the environmental improvement rider were approved by the MPUC in a November 2018 order. On January 19, 2021, Minnesota Power filed a petition seeking MPUC approval to end the environmental improvement rider.

Fuel Adjustment Clause Reform. In a 2017 order, the MPUC adopted a program to implement certain procedural reforms to Minnesota utilities’ automatic fuel adjustment clause (FAC) for fuel and purchased power. With this order, the method of accounting for all Minnesota electric utilities changed to a monthly budgeted, forward-looking FAC with annual prudence review and true-up to actual allowed costs. On May 1, 2019, Minnesota Power filed its fuel adjustment forecast for 2020, which was accepted by the MPUC in an order dated November 14, 2019, for purposes of setting fuel adjustment clause rates for 2020, subject to a true-up filing in 2021. On May 1, 2020, Minnesota Power filed its fuel adjustment forecast for 2021, which was approved by the MPUC in an order dated December 22, 2020.

On March 2, 2020, Minnesota Power filed its fuel adjustment clause report covering the period July 2018 through December 2019. In an order dated September 16, 2020, the MPUC referred the review of Minnesota Power’s forced outage costs during the period of the report, which totaled approximately $8 million, to an administrative law judge for a contested case hearing to recommend to the MPUC if any of those costs should be returned to customers. A recommendation by the administrative law judge is expected in the third quarter of 2021. We cannot predict the outcome of this proceeding.
NOTE 4. REGULATORY MATTERS (Continued)
Electric Rates (Continued)

COVID-19 Related Deferred Accounting. In an order dated March 24, 2020, the PSCW authorized public utilities, including SWL&P, to defer expenditures incurred by the utility resulting from its compliance with state government or regulator orders during Wisconsin’s declared public health emergency for COVID-19. On April 20, 2020, Minnesota Power along with other regulated electric and natural gas service providers in Minnesota filed a joint petition to request MPUC authorization to track incremental costs and expenses incurred as a result of the COVID-19 pandemic, and to defer and record such costs as a regulatory asset, subject to recovery in a future proceeding. In an order dated May 22, 2020, the MPUC approved the joint petition requiring the joint petitioners to track cost and revenue impacts resulting from the COVID-19 pandemic with review for recovery in a future rate proceeding. As of December 31, 2020, Minnesota Power has not deferred any costs or lost revenue, and SWL&P has deferred an immaterial amount of costs.

Minnesota Power submitted a petition in November 2020 to the MPUC requesting authority to track and record as a regulatory asset lost large industrial customer revenue resulting from the idling of USS Corporation’s Keetac plant and Verso Corporation’s paper mill in Duluth, Minnesota. Keetac and Verso represent revenue of approximately $30 million annually, net of associated expense savings such as fuel costs. Minnesota Power proposed in this petition to defer any lost revenue related to the idling of the Keetac facility and the Verso paper mill to its next general rate case or other proceeding for review for recovery by the MPUC. Minnesota Power expects a final decision by the MPUC in mid-2021.

2018 Wisconsin General Rate Case. In a 2018 order, the PSCW approved a rate increase for SWL&P including a return on equity of 10.4 percent and a 55.0 percent equity ratio. Final rates went into effect January 1, 2019, which resulted in additional revenue of approximately $3 million. The PSCW had directed SWL&P to file its next general rate case in 2020; however, the PSCW granted an extension request made by SWL&P to delay filing its next general rate case until on or before December 20, 2022. SWL&P requested the extension primarily due to impacts of the COVID-19 pandemic.

Integrated Resource Plan. In a 2016 order, the MPUC approved Minnesota Power’s 2015 IRP with modifications. The order accepted Minnesota Power’s plans for the economic idling of Taconite Harbor Units 1 and 2 and the ceasing of coal-fired operations at Taconite Harbor in 2020, directed Minnesota Power to retire Boswell Units 1 and 2, required an analysis of generation and demand response alternatives to be filed with a natural gas resource proposal, and required Minnesota Power to conduct requests for proposal for additional wind, solar and demand response resource additions. Minnesota Power retired Boswell Units 1 and 2 in the fourth quarter of 2018. The MPUC also required a baseload retirement study analyzing its existing fleet potential early retirement scenarios of Boswell Units 3 and 4, as well as a securitization plan.

2021 Integrated Resource Plan. On February 1, 2021, Minnesota Power filed its latest IRP with the MPUC, which outlines its clean-energy transition plans through 2035. These plans include expanding its renewable energy supply, achieving coal-free operations at its facilities by 2035, and investing in a resilient and flexible transmission and distribution grid. As part of these plans, Minnesota Power anticipates adding approximately 400 MW of new wind and solar energy resources, retiring Boswell Unit 3 by 2030 and transforming Boswell Unit 4 to be coal-free by 2035. Minnesota Power’s plans recognize that advances in technology will play a significant role in completing its transition to carbon-free energy supply, reliably and affordably. A final decision on the IRP is expected in late 2021.

Nemadji Trail Energy Center. In 2017, Minnesota Power submitted a resource package to the MPUC which included requesting approval of a 250 MW natural gas capacity dedication and other affiliated-interest agreements for NTEC, a proposed 525 MW to 550 MW combined-cycle natural gas-fired generating facility which will be jointly owned by Dairyland Power Cooperative and a subsidiary of ALLETE. Minnesota Power would purchase approximately 50 percent of the facility's output starting in 2025. In a January 2019 order, the MPUC approved Minnesota Power’s request for approval of the NTEC natural gas capacity dedication and other affiliated-interest agreements. In December 2019, the Minnesota Court of Appeals reversed and remanded the MPUC’s decision to approve certain affiliated-interest agreements. The MPUC was ordered to determine whether NTEC may have the potential for significant environmental effects and, if so, to prepare an environmental assessment before reassessing the agreements. On January 22, 2020, Minnesota Power filed a petition for further review with the Minnesota Supreme Court requesting that it review and overturn the Minnesota Court of Appeals decision, which petition was accepted for review by the Minnesota Supreme Court with oral arguments held on October 6, 2020. There is no deadline for the Minnesota Supreme Court to issue a ruling. In January 2019, an application for a certificate of public convenience and necessity for NTEC was submitted to the PSCW, which was approved by the PSCW at a hearing on January 16, 2020. Construction of NTEC is subject to obtaining additional permits from local, state and federal authorities. The total project cost is estimated to be approximately $700 million, of which ALLETE’s portion is expected to be approximately $350 million. ALLETE’s portion of NTEC project costs incurred through December 31, 2020, is approximately $15 million.
NOTE 4. REGULATORY MATTERS (Continued)

Conservation Improvement Program. Minnesota requires electric utilities to spend a minimum of 1.5 percent of gross operating revenues, excluding revenue received from exempt customers, from service provided in the state on energy CIPs each year.

On May 1, 2020, Minnesota Power submitted its 2019 consolidated filing detailing Minnesota Power’s CIP program results and requesting a CIP financial incentive of $2.4 million based upon MPUC procedures, which was recognized in the third quarter of 2020 upon approval by the MPUC in an order dated August 18, 2020. In 2019, the CIP financial incentive of $2.8 million was recognized in the third quarter upon approval by the MPUC of Minnesota Power’s 2018 CIP consolidated filing. CIP financial incentives are recognized in the period in which the MPUC approves the filing.

On July 1, 2020, Minnesota Power submitted its CIP triennial filing for 2021 through 2023 to the MPUC and Minnesota Department of Commerce, which outlines Minnesota Power’s CIP spending and energy-saving goals for those years. Minnesota Power’s CIP investment goals are $10.5 million for 2021, $10.7 million for 2022 and $10.9 million for 2023, subject to MPUC and Minnesota Department of Commerce approval.

MISO Return on Equity Complaint. MISO transmission owners, including ALLETE and ATC, have an authorized return on equity of 10.02 percent, or 10.52 percent including an incentive adder for participation in a regional transmission organization based on a May 21, 2020, FERC order. That order granted rehearing of a November 2019 FERC order, which had reduced the base return on equity for regional transmission organizations to 9.88 percent, or 10.38 percent including an incentive adder, based on a return on equity complaint that had been filed against MISO transmission owners.

Minnesota Solar Energy Standard. Minnesota law required at least 1.5 percent of total retail electric sales, excluding sales to certain customers, to be generated by solar energy by the end of 2020. At least 10 percent of the 1.5 percent mandate must be met by solar energy generated by or procured from solar photovoltaic devices with a nameplate capacity of 40 kW or less and community solar garden subscriptions.

Minnesota Power’s solar energy supply consists of Camp Ripley, a 10 MW solar energy facility at the Camp Ripley Minnesota Army National Guard base and training facility near Little Falls, Minnesota, and a community solar garden project in northeastern Minnesota, which is comprised of a 1 MW solar array owned and operated by a third party with the output purchased by Minnesota Power and a 40 kW solar array that is owned and operated by Minnesota Power. Minnesota Power has met both parts of the solar mandate.

On May 20, 2020, the MPUC issued a notice requesting all regulated gas and electric utilities provide a list of all ongoing, planned, or possible investments that support Minnesota’s energy policy objectives and aid economic recovery in Minnesota, among other items. On June 17, 2020, Minnesota Power filed a response which included outlining a proposal to accelerate its plans for solar energy with an estimated $40 million investment in approximately 20 MW of solar energy projects in Minnesota.

Regulatory Assets and Liabilities. Our regulated utility operations are subject to accounting standards for the effects of certain types of regulation. Regulatory assets represent incurred costs that have been deferred as they are probable for recovery in customer rates. Regulatory liabilities represent obligations to make refunds to customers and amounts collected in rates for which the related costs have not yet been incurred. The Company assesses quarterly whether regulatory assets and liabilities meet the criteria for probability of future recovery or deferral. With the exception of the regulatory asset for Boswell Units 1 and 2 net plant and equipment, no other regulatory assets are currently earning a return. The recovery, refund or credit to rates for these regulatory assets and liabilities will occur over the periods either specified by the applicable regulatory authority or over the corresponding period related to the asset or liability.
NOTE 4. REGULATORY MATTERS (Continued)

Regulatory Assets and Liabilities 
As of December 3120202019
Millions 
Non-Current Regulatory Assets
Defined Benefit Pension and Other Postretirement Benefit Plans (a)
$259.7 $212.9 
Income Taxes (b)
113.7 123.4 
Asset Retirement Obligations (c)
31.6 32.0 
Cost Recovery Riders (d)
54.0 24.7 
Boswell Units 1 and 2 Net Plant and Equipment (e)
5.0 10.7 
Manufactured Gas Plant (f)
8.8 8.2 
PPACA Income Tax Deferral4.5 4.8 
Other3.6 3.8 
Total Non-Current Regulatory Assets$480.9 $420.5 
Current Regulatory Liabilities (g)
Fuel Adjustment Clause (h)
$3.7 — 
Transmission Formula Rates2.9 $1.7 
Other1.0 0.2 
Total Current Regulatory Liabilities 7.6 1.9 
Non-Current Regulatory Liabilities  
Income Taxes (b)
375.3 407.2 
Wholesale and Retail Contra AFUDC (i)
86.6 79.3 
Plant Removal Obligations (j)
41.2 35.5 
Defined Benefit Pension and Other Postretirement Benefit Plans (a)
4.4 17.0 
North Dakota Investment Tax Credits (k)
12.0 12.3 
Conservation Improvement Program (l)
1.5 5.4 
Other3.8 3.6 
Total Non-Current Regulatory Liabilities524.8 560.3 
Total Regulatory Liabilities$532.4 $562.2 
(a)Defined benefit pension and other postretirement items included in our Regulated Operations, which are otherwise required to be recognized in accumulated other comprehensive income as actuarial gains and losses as well as prior service costs and credits, are recognized as regulatory assets or regulatory liabilities on the Consolidated Balance Sheet. The asset or liability will decrease as the deferred items are amortized and recognized as components of net periodic benefit cost. (See Note 11. Pension and Other Postretirement Benefit Plans.)
(b)These costs represent the difference between deferred income taxes recognized for financial reporting purposes and amounts previously billed to our customers. The balances will primarily decrease over the remaining life of the related temporary differences.
(c)Asset retirement obligations will accrete and be amortized over the lives of the related property with asset retirement obligations.
(d)The cost recovery rider regulatory assets and liabilities are revenue not yet collected from our customers and cash collections from our customers in excess of the revenue recognized, respectively, primarily due to capital expenditures related to Bison, investment in CapX2020 projects, the Boswell Unit 4 environmental upgrade and the GNTL. The cost recovery rider regulatory assets as of December 31, 2020, will be recovered within the next two years.
(e)In 2018, Minnesota Power retired Boswell Units 1 and 2 and reclassified the remaining net book value from property, plant and equipment to a regulatory asset on the Consolidated Balance Sheet. The remaining net book value is currently included in Minnesota Power’s rate base and Minnesota Power is earning a return on the outstanding balance.
(f)The manufactured gas plant regulatory asset represents costs of remediation for a former manufactured gas plant site located in Superior, Wisconsin, and formerly operated by SWL&P. We expect recovery of these remediation costs to be allowed by the PSCW in rates over time.
(g)Current regulatory liabilities are presented within Other Current Liabilities on the Consolidated Balance Sheet.
(h)Fuel adjustment clause regulatory liability represents the amount expected to be refunded to customers for the over-collection of fuel adjustment clause recoveries. (See Fuel Adjustment Clause Reform.)
(i)Wholesale and retail contra AFUDC represents amortization to offset AFUDC Equity and Debt recorded during the construction period of our cost recovery rider projects prior to placing the projects in service. The regulatory liability will decrease over the remaining depreciable life of the related asset.
(j)Non-legal plant removal obligations included in retail customer rates that have not yet been incurred.
(k)North Dakota investment tax credits expected to be realized from Bison that will be credited to Minnesota Power’s retail customers through future renewable cost recovery rider filings as the tax credits are utilized.
(l)The conservation improvement program regulatory liability represents CIP expenditures, any financial incentive earned for cost-effective program achievements and a carrying charge deferred for future refund over the next year following MPUC approval.