Acquisitions, Dispositions, and Impairment of Long-Lived Assets Narrative (Details)
1 Months Ended 3 Months Ended 12 Months Ended
Jan. 31, 2022
USD ($)
Dec. 31, 2021
USD ($)
MW
Jun. 30, 2021
USD ($)
MW
May 31, 2021
USD ($)
Nov. 30, 2020
USD ($)
MW
Oct. 31, 2019
USD ($)
MW
Aug. 31, 2019
USD ($)
Apr. 30, 2019
Jan. 31, 2019
USD ($)
Jul. 31, 2018
Nov. 30, 2016
Dec. 31, 2019
USD ($)
Mar. 31, 2019
USD ($)
Dec. 31, 2018
USD ($)
Dec. 31, 2022
USD ($)
Dec. 31, 2021
USD ($)
$ / MWh
Dec. 31, 2020
USD ($)
Dec. 31, 2019
USD ($)
May 28, 2021
USD ($)
Business Acquisition [Line Items]                                      
Revenue from Contract with Customer, Excluding Assessed Tax                               $ 11,742,896,000 $ 10,113,636,000 $ 10,878,673,000  
Proceeds from Sale of Productive Assets                               17,421,000 0 28,932,000  
Net Book Value   $ 64,263,250,000                           64,263,250,000 59,696,443,000    
Asset Retirement Obligation   4,757,100,000                   $ 6,159,200,000       4,757,100,000 6,469,500,000 6,159,200,000  
Decommissioning Fund Investments   5,514,016,000                           5,514,016,000 7,253,215,000    
Asset Write-Offs, Impairments, And Related Charges                               263,599,000 26,379,000 226,678,000  
Asset Impairment Charges                               263,625,000 26,623,000 290,027,000  
Decommissioning                               306,411,000 381,861,000 400,802,000  
Assets, Fair Value Disclosure   6,005,000,000                           $ 6,005,000,000 9,122,000,000    
Discontinued Operation, Tax Effect of Discontinued Operation                         $ 29,000,000            
Acquisitions And Dispositions                               ACQUISITIONS, DISPOSITIONS, AND IMPAIRMENT OF LONG-LIVED ASSETS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy Texas)
Acquisitions

Searcy Solar Facility

In March 2019, Entergy Arkansas entered into a build-own-transfer agreement for the purchase of an approximately 100 MW solar energy facility to be sited on approximately 800 acres in White County near Searcy, Arkansas. The project, Searcy Solar facility, was being constructed by a subsidiary of NextEra Energy Resources. In April 2020 the APSC issued an order approving Entergy Arkansas’s acquisition of the Searcy Solar facility as
being in the public interest. In May 2021, Entergy Arkansas filed with the APSC an application seeking to amend its certificate for the Searcy Solar facility to allow for the use of a tax equity partnership to acquire and own the facility. The tax equity partnership structure is expected to reduce costs and yield incremental net benefits to customers beyond those expected under the build-own-transfer structure alone. The APSC approved Entergy Arkansas’s tax equity partnership request in September 2021. AR Searcy Partnership, LLC was formed for the tax equity partnership with Entergy Arkansas as its managing member. In November 2021 both Entergy Arkansas and the tax equity investor made capital contributions to the tax equity partnership that were then used to acquire the facility. Upon substantial completion of the facility in December 2021, the tax equity partnership completed the purchase of the Searcy Solar facility. The purchase price for the Searcy Solar facility was approximately $133 million, which includes a final payment of approximately $1 million to be made in 2022. See Note 1 to the financial statements for further discussion of the HLBV method of accounting used to account for the investment in AR Searcy Partnership, LLC.

Hardin County Peaking Facility

In June 2021, Entergy Texas purchased the Hardin County Peaking Facility, an existing 147 MW simple-cycle gas-fired peaking power plant in Kountze, Texas, from East Texas Electric Cooperative, Inc. In addition, also in June 2021, Entergy Texas sold a 7.56% partial interest in the Montgomery County Power Station to East Texas Electric Cooperative, Inc. for approximately $68 million. The two interdependent transactions were approved by the PUCT in April 2021. The purchase price for the Hardin County Peaking Facility was approximately $37 million.

Washington Parish Energy Center

In April 2017, Entergy Louisiana entered into an agreement with a subsidiary of Calpine Corporation for the construction and purchase of Washington Parish Energy Center, which consists of two natural gas-fired combustion turbine units with a total nominal capacity of approximately 361 MW. In November 2020, Entergy Louisiana completed the purchase, as approved by the LPSC, of the Washington Parish Energy Center. The total investment including transmission and other related costs, is approximately $261 million, including a payment of $222 million to purchase the plant.

Choctaw Generating Station

In October 2019, Entergy Mississippi purchased the Choctaw Generating Station, an 810 MW natural gas fired combined-cycle turbine plant located near French Camp, Mississippi, from a subsidiary of GenOn Energy Inc. The purchase price for the Choctaw Generating Station was approximately $305 million.

Dispositions

Indian Point Energy Center

In April 2019, Entergy entered into an agreement to sell, directly or indirectly, 100% of the equity interests in the subsidiaries that own Indian Point 1, Indian Point 2, and Indian Point 3, after Indian Point 3 had been shut down and defueled, to a Holtec International subsidiary. In November 2020 the NRC approved the sale of the plant to Holtec. Indian Point 3 was shut down in April 2021 and defueled in May 2021. In May 2021 the New York State Public Service Commission approved the sale of the plant to Holtec. The transaction closed in May 2021. The sale included the transfer of the licenses, spent fuel, decommissioning liabilities, and nuclear decommissioning trusts for the three units. The transaction resulted in a charge of $340 million ($268 million net-of-tax) in the second quarter of 2021. The disposition-date fair value of the nuclear decommissioning trust funds was approximately $2,387 million and the disposition-date fair value of the asset retirement obligations was $1,996 million. The transaction also included materials and supplies and prepaid assets.
Pilgrim

In July 2018, Entergy entered into a purchase and sale agreement with Holtec International to sell to a Holtec subsidiary 100% of the equity interests in Entergy Nuclear Generation Company, the owner of the Pilgrim plant. In August 2019 the NRC approved the sale of the plant to Holtec. The transaction closed in August 2019 for a purchase price of $1,000 (subject to adjustments for net liabilities and other amounts). The sale included the transfer of the Pilgrim nuclear decommissioning trust and the asset retirement obligation for spent fuel management and plant decommissioning. The transaction resulted in a loss of $190 million ($156 million net-of-tax) in the third quarter 2019. The disposition-date fair value of the nuclear decommissioning trust fund was approximately $1,030 million and the disposition-date fair value of the asset retirement obligation was $837 million. The transaction also included property, plant, and equipment with a net book value of zero, materials and supplies, and prepaid assets.

Vermont Yankee

In November 2016, Entergy entered into an agreement to sell 100% of the membership interests in Entergy Nuclear Vermont Yankee, LLC to a subsidiary of NorthStar. Entergy Nuclear Vermont Yankee was the owner of the Vermont Yankee plant. The sale of Entergy Nuclear Vermont Yankee to NorthStar included the transfer of the nuclear decommissioning trust fund and the asset retirement obligation for the spent fuel management and decommissioning of the plant.

In March 2018, Entergy and NorthStar entered into a settlement agreement and a Memorandum of Understanding with State of Vermont agencies and other interested parties that set forth the terms on which the agencies and parties support the Vermont Public Utility Commission’s approval of the transaction. The agreements provide additional financial assurance for decommissioning, spent fuel management and site restoration, and detail the site restoration standards. In October 2018 the NRC issued an order approving the application to transfer Vermont Yankee’s license to NorthStar for decommissioning. In December 2018 the Vermont Public Utility Commission issued an order approving the transaction consistent with the Memorandum of Understanding’s terms. On January 11, 2019, Entergy and NorthStar closed the transaction.

Entergy Nuclear Vermont Yankee had an outstanding credit facility that was used to pay for dry fuel storage costs. This credit facility was guaranteed by Entergy Corporation. A subsidiary of Entergy assumed the obligations under the credit facility, which remains outstanding. At the closing of the sale transaction, NorthStar caused Entergy Nuclear Vermont Yankee, renamed NorthStar Vermont Yankee, to issue a $139 million promissory note to the Entergy subsidiary that assumed the credit facility obligations. The amount of the note included the balance outstanding on the credit facility, as well as borrowing fees and costs incurred by Entergy in connection with the credit facility.

With the receipt of the NRC and Vermont Public Utility Commission approvals and the resolution among the parties of the significant conditions of the sale, Entergy concluded that as of December 31, 2018, Vermont Yankee was in held for sale status. Entergy accordingly evaluated the Vermont Yankee asset retirement obligation in light of the terms of the sale transaction and evaluated the remaining values of the Vermont Yankee assets. These evaluations resulted in an increase in the asset retirement obligation and $173 million of asset impairment and related other charges in the fourth quarter 2018. Upon closing of the transaction in January 2019, the Vermont Yankee decommissioning trust, along with the decommissioning obligation for the plant, was transferred to NorthStar.

The Vermont Yankee spent fuel disposal contract was assigned to NorthStar as part of the transaction. The Vermont Yankee transaction resulted in Entergy generating a net deferred tax asset in January 2019.  The deferred tax asset could not be fully realized by Entergy in the first quarter of 2019; accordingly, Entergy accrued a net tax expense of $29 million on the disposition of Vermont Yankee. The transaction also resulted in other charges of $5.4 million ($4.2 million net-of-tax) in the first quarter 2019.
Impairment of Long-lived Assets

2019, 2020, and 2021 Impairments

Entergy continues to execute its strategy to shut down and sell all of the remaining plants in Entergy Wholesale Commodities’ merchant nuclear fleet, with a planned shutdown of the only remaining operating plant, Palisades, by May 31, 2022. The other five Entergy Wholesale Commodities’ nuclear plants, FitzPatrick, Vermont Yankee, Pilgrim, Indian Point 2, and Indian Point 3, have been sold. The FitzPatrick plant was classified as held-for-sale at December 31, 2016, and subsequently sold to Exelon in March 2017. The Vermont Yankee plant was classified as held-for-sale at December 31, 2018, and subsequently sold to NorthStar on January 11, 2019. The Pilgrim plant was sold to Holtec International on August 26, 2019. The Indian Point 2 and Indian Point 3 plants were sold to Holtec International on May 28, 2021.

Entergy Wholesale Commodities incurred $7 million in 2021, $19 million in 2020, and $100 million in 2019 of impairment charges primarily related to nuclear fuel spending, nuclear refueling outage spending, and expenditures for capital assets. These costs were charged to expense as incurred as a result of the impaired fair value of the Entergy Wholesale Commodities nuclear plants’ long-lived assets due to the significantly reduced remaining estimated operating lives associated with management’s strategy to exit the Entergy Wholesale Commodities merchant power business.

With respect to Palisades, Entergy and Consumers Energy had agreed to amend the existing PPA so that it would terminate early, on May 31, 2018. In September 2017, however, Entergy and Consumers Energy agreed to terminate the PPA amendment agreement. Entergy continues to operate Palisades under the current PPA with Consumers Energy, instead of shutting down in the fall of 2018 as previously planned. Entergy intends to shut down the Palisades plant permanently no later than May 31, 2022. As a result of the change in expected operating life of the Palisades plant, the expected probability-weighted undiscounted net cash flows as of September 30, 2017 exceeded the carrying value of the plant and related assets. Accordingly, nuclear fuel spending, nuclear refueling outage spending, and expenditures for capital assets incurred at Palisades after September 30, 2017 are no longer charged to expense as incurred, but recorded as assets and depreciated or amortized, subject to the typical periodic impairment reviews prescribed in the accounting rules.

The impairments and other related charges are recorded as a separate line item in Entergy’s consolidated statements of operations and are included within the results of the Entergy Wholesale Commodities segment. In addition to the impairments and other related charges, Entergy expects to incur additional charges through mid-2022 associated with these strategic transactions. See Note 13 to the financial statements for further discussion of these additional charges.
     
Entergy Arkansas [Member]                                      
Business Acquisition [Line Items]                                      
Revenue from Contract with Customer, Excluding Assessed Tax                               $ 2,338,590,000 2,084,494,000 2,259,594,000  
Net Book Value   13,578,297,000                           13,578,297,000 12,905,322,000    
Asset Retirement Obligation   1,390,400,000                   1,242,600,000       1,390,400,000 1,314,200,000 1,242,600,000  
Decommissioning Fund Investments   1,438,416,000                           1,438,416,000 1,273,921,000    
Decommissioning                               77,696,000 73,319,000 68,030,000  
Assets, Fair Value Disclosure   1,445,500,000                           $ 1,445,500,000 1,444,600,000    
Acquisitions And Dispositions                               ACQUISITIONS, DISPOSITIONS, AND IMPAIRMENT OF LONG-LIVED ASSETS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy Texas)
Acquisitions

Searcy Solar Facility

In March 2019, Entergy Arkansas entered into a build-own-transfer agreement for the purchase of an approximately 100 MW solar energy facility to be sited on approximately 800 acres in White County near Searcy, Arkansas. The project, Searcy Solar facility, was being constructed by a subsidiary of NextEra Energy Resources. In April 2020 the APSC issued an order approving Entergy Arkansas’s acquisition of the Searcy Solar facility as
being in the public interest. In May 2021, Entergy Arkansas filed with the APSC an application seeking to amend its certificate for the Searcy Solar facility to allow for the use of a tax equity partnership to acquire and own the facility. The tax equity partnership structure is expected to reduce costs and yield incremental net benefits to customers beyond those expected under the build-own-transfer structure alone. The APSC approved Entergy Arkansas’s tax equity partnership request in September 2021. AR Searcy Partnership, LLC was formed for the tax equity partnership with Entergy Arkansas as its managing member. In November 2021 both Entergy Arkansas and the tax equity investor made capital contributions to the tax equity partnership that were then used to acquire the facility. Upon substantial completion of the facility in December 2021, the tax equity partnership completed the purchase of the Searcy Solar facility. The purchase price for the Searcy Solar facility was approximately $133 million, which includes a final payment of approximately $1 million to be made in 2022. See Note 1 to the financial statements for further discussion of the HLBV method of accounting used to account for the investment in AR Searcy Partnership, LLC.

Hardin County Peaking Facility

In June 2021, Entergy Texas purchased the Hardin County Peaking Facility, an existing 147 MW simple-cycle gas-fired peaking power plant in Kountze, Texas, from East Texas Electric Cooperative, Inc. In addition, also in June 2021, Entergy Texas sold a 7.56% partial interest in the Montgomery County Power Station to East Texas Electric Cooperative, Inc. for approximately $68 million. The two interdependent transactions were approved by the PUCT in April 2021. The purchase price for the Hardin County Peaking Facility was approximately $37 million.

Washington Parish Energy Center

In April 2017, Entergy Louisiana entered into an agreement with a subsidiary of Calpine Corporation for the construction and purchase of Washington Parish Energy Center, which consists of two natural gas-fired combustion turbine units with a total nominal capacity of approximately 361 MW. In November 2020, Entergy Louisiana completed the purchase, as approved by the LPSC, of the Washington Parish Energy Center. The total investment including transmission and other related costs, is approximately $261 million, including a payment of $222 million to purchase the plant.

Choctaw Generating Station

In October 2019, Entergy Mississippi purchased the Choctaw Generating Station, an 810 MW natural gas fired combined-cycle turbine plant located near French Camp, Mississippi, from a subsidiary of GenOn Energy Inc. The purchase price for the Choctaw Generating Station was approximately $305 million.

Dispositions

Indian Point Energy Center

In April 2019, Entergy entered into an agreement to sell, directly or indirectly, 100% of the equity interests in the subsidiaries that own Indian Point 1, Indian Point 2, and Indian Point 3, after Indian Point 3 had been shut down and defueled, to a Holtec International subsidiary. In November 2020 the NRC approved the sale of the plant to Holtec. Indian Point 3 was shut down in April 2021 and defueled in May 2021. In May 2021 the New York State Public Service Commission approved the sale of the plant to Holtec. The transaction closed in May 2021. The sale included the transfer of the licenses, spent fuel, decommissioning liabilities, and nuclear decommissioning trusts for the three units. The transaction resulted in a charge of $340 million ($268 million net-of-tax) in the second quarter of 2021. The disposition-date fair value of the nuclear decommissioning trust funds was approximately $2,387 million and the disposition-date fair value of the asset retirement obligations was $1,996 million. The transaction also included materials and supplies and prepaid assets.
Pilgrim

In July 2018, Entergy entered into a purchase and sale agreement with Holtec International to sell to a Holtec subsidiary 100% of the equity interests in Entergy Nuclear Generation Company, the owner of the Pilgrim plant. In August 2019 the NRC approved the sale of the plant to Holtec. The transaction closed in August 2019 for a purchase price of $1,000 (subject to adjustments for net liabilities and other amounts). The sale included the transfer of the Pilgrim nuclear decommissioning trust and the asset retirement obligation for spent fuel management and plant decommissioning. The transaction resulted in a loss of $190 million ($156 million net-of-tax) in the third quarter 2019. The disposition-date fair value of the nuclear decommissioning trust fund was approximately $1,030 million and the disposition-date fair value of the asset retirement obligation was $837 million. The transaction also included property, plant, and equipment with a net book value of zero, materials and supplies, and prepaid assets.

Vermont Yankee

In November 2016, Entergy entered into an agreement to sell 100% of the membership interests in Entergy Nuclear Vermont Yankee, LLC to a subsidiary of NorthStar. Entergy Nuclear Vermont Yankee was the owner of the Vermont Yankee plant. The sale of Entergy Nuclear Vermont Yankee to NorthStar included the transfer of the nuclear decommissioning trust fund and the asset retirement obligation for the spent fuel management and decommissioning of the plant.

In March 2018, Entergy and NorthStar entered into a settlement agreement and a Memorandum of Understanding with State of Vermont agencies and other interested parties that set forth the terms on which the agencies and parties support the Vermont Public Utility Commission’s approval of the transaction. The agreements provide additional financial assurance for decommissioning, spent fuel management and site restoration, and detail the site restoration standards. In October 2018 the NRC issued an order approving the application to transfer Vermont Yankee’s license to NorthStar for decommissioning. In December 2018 the Vermont Public Utility Commission issued an order approving the transaction consistent with the Memorandum of Understanding’s terms. On January 11, 2019, Entergy and NorthStar closed the transaction.

Entergy Nuclear Vermont Yankee had an outstanding credit facility that was used to pay for dry fuel storage costs. This credit facility was guaranteed by Entergy Corporation. A subsidiary of Entergy assumed the obligations under the credit facility, which remains outstanding. At the closing of the sale transaction, NorthStar caused Entergy Nuclear Vermont Yankee, renamed NorthStar Vermont Yankee, to issue a $139 million promissory note to the Entergy subsidiary that assumed the credit facility obligations. The amount of the note included the balance outstanding on the credit facility, as well as borrowing fees and costs incurred by Entergy in connection with the credit facility.

With the receipt of the NRC and Vermont Public Utility Commission approvals and the resolution among the parties of the significant conditions of the sale, Entergy concluded that as of December 31, 2018, Vermont Yankee was in held for sale status. Entergy accordingly evaluated the Vermont Yankee asset retirement obligation in light of the terms of the sale transaction and evaluated the remaining values of the Vermont Yankee assets. These evaluations resulted in an increase in the asset retirement obligation and $173 million of asset impairment and related other charges in the fourth quarter 2018. Upon closing of the transaction in January 2019, the Vermont Yankee decommissioning trust, along with the decommissioning obligation for the plant, was transferred to NorthStar.

The Vermont Yankee spent fuel disposal contract was assigned to NorthStar as part of the transaction. The Vermont Yankee transaction resulted in Entergy generating a net deferred tax asset in January 2019.  The deferred tax asset could not be fully realized by Entergy in the first quarter of 2019; accordingly, Entergy accrued a net tax expense of $29 million on the disposition of Vermont Yankee. The transaction also resulted in other charges of $5.4 million ($4.2 million net-of-tax) in the first quarter 2019.
Impairment of Long-lived Assets

2019, 2020, and 2021 Impairments

Entergy continues to execute its strategy to shut down and sell all of the remaining plants in Entergy Wholesale Commodities’ merchant nuclear fleet, with a planned shutdown of the only remaining operating plant, Palisades, by May 31, 2022. The other five Entergy Wholesale Commodities’ nuclear plants, FitzPatrick, Vermont Yankee, Pilgrim, Indian Point 2, and Indian Point 3, have been sold. The FitzPatrick plant was classified as held-for-sale at December 31, 2016, and subsequently sold to Exelon in March 2017. The Vermont Yankee plant was classified as held-for-sale at December 31, 2018, and subsequently sold to NorthStar on January 11, 2019. The Pilgrim plant was sold to Holtec International on August 26, 2019. The Indian Point 2 and Indian Point 3 plants were sold to Holtec International on May 28, 2021.

Entergy Wholesale Commodities incurred $7 million in 2021, $19 million in 2020, and $100 million in 2019 of impairment charges primarily related to nuclear fuel spending, nuclear refueling outage spending, and expenditures for capital assets. These costs were charged to expense as incurred as a result of the impaired fair value of the Entergy Wholesale Commodities nuclear plants’ long-lived assets due to the significantly reduced remaining estimated operating lives associated with management’s strategy to exit the Entergy Wholesale Commodities merchant power business.

With respect to Palisades, Entergy and Consumers Energy had agreed to amend the existing PPA so that it would terminate early, on May 31, 2018. In September 2017, however, Entergy and Consumers Energy agreed to terminate the PPA amendment agreement. Entergy continues to operate Palisades under the current PPA with Consumers Energy, instead of shutting down in the fall of 2018 as previously planned. Entergy intends to shut down the Palisades plant permanently no later than May 31, 2022. As a result of the change in expected operating life of the Palisades plant, the expected probability-weighted undiscounted net cash flows as of September 30, 2017 exceeded the carrying value of the plant and related assets. Accordingly, nuclear fuel spending, nuclear refueling outage spending, and expenditures for capital assets incurred at Palisades after September 30, 2017 are no longer charged to expense as incurred, but recorded as assets and depreciated or amortized, subject to the typical periodic impairment reviews prescribed in the accounting rules.

The impairments and other related charges are recorded as a separate line item in Entergy’s consolidated statements of operations and are included within the results of the Entergy Wholesale Commodities segment. In addition to the impairments and other related charges, Entergy expects to incur additional charges through mid-2022 associated with these strategic transactions. See Note 13 to the financial statements for further discussion of these additional charges.
     
Entergy New Orleans [Member]                                      
Business Acquisition [Line Items]                                      
Revenue from Contract with Customer, Excluding Assessed Tax                               $ 768,852,000 633,841,000 686,223,000  
Net Book Value   1,976,202,000                           1,976,202,000 1,821,638,000    
Asset Retirement Obligation   4,000,000.0                   3,500,000       4,000,000.0 3,800,000 3,500,000  
Assets, Fair Value Disclosure   44,900,000                           44,900,000 86,500,000    
Reduction to income tax expense                                 8,000,000    
Entergy Louisiana [Member]                                      
Business Acquisition [Line Items]                                      
Revenue from Contract with Customer, Excluding Assessed Tax                               5,068,448,000 4,069,862,000 4,285,175,000  
Proceeds from Sale of Productive Assets                               15,000,000 0 0  
Net Book Value   28,055,038,000                           28,055,038,000 25,619,789,000    
Asset Retirement Obligation   1,653,200,000                   1,497,300,000       1,653,200,000 1,573,300,000 1,497,300,000  
Decommissioning Fund Investments   2,114,523,000                           2,114,523,000 1,794,042,000    
Decommissioning                               68,575,000 65,225,000 59,346,000  
Assets, Fair Value Disclosure   2,144,500,000                           $ 2,144,500,000 2,528,900,000    
Acquisitions And Dispositions                               ACQUISITIONS, DISPOSITIONS, AND IMPAIRMENT OF LONG-LIVED ASSETS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy Texas)
Acquisitions

Searcy Solar Facility

In March 2019, Entergy Arkansas entered into a build-own-transfer agreement for the purchase of an approximately 100 MW solar energy facility to be sited on approximately 800 acres in White County near Searcy, Arkansas. The project, Searcy Solar facility, was being constructed by a subsidiary of NextEra Energy Resources. In April 2020 the APSC issued an order approving Entergy Arkansas’s acquisition of the Searcy Solar facility as
being in the public interest. In May 2021, Entergy Arkansas filed with the APSC an application seeking to amend its certificate for the Searcy Solar facility to allow for the use of a tax equity partnership to acquire and own the facility. The tax equity partnership structure is expected to reduce costs and yield incremental net benefits to customers beyond those expected under the build-own-transfer structure alone. The APSC approved Entergy Arkansas’s tax equity partnership request in September 2021. AR Searcy Partnership, LLC was formed for the tax equity partnership with Entergy Arkansas as its managing member. In November 2021 both Entergy Arkansas and the tax equity investor made capital contributions to the tax equity partnership that were then used to acquire the facility. Upon substantial completion of the facility in December 2021, the tax equity partnership completed the purchase of the Searcy Solar facility. The purchase price for the Searcy Solar facility was approximately $133 million, which includes a final payment of approximately $1 million to be made in 2022. See Note 1 to the financial statements for further discussion of the HLBV method of accounting used to account for the investment in AR Searcy Partnership, LLC.

Hardin County Peaking Facility

In June 2021, Entergy Texas purchased the Hardin County Peaking Facility, an existing 147 MW simple-cycle gas-fired peaking power plant in Kountze, Texas, from East Texas Electric Cooperative, Inc. In addition, also in June 2021, Entergy Texas sold a 7.56% partial interest in the Montgomery County Power Station to East Texas Electric Cooperative, Inc. for approximately $68 million. The two interdependent transactions were approved by the PUCT in April 2021. The purchase price for the Hardin County Peaking Facility was approximately $37 million.

Washington Parish Energy Center

In April 2017, Entergy Louisiana entered into an agreement with a subsidiary of Calpine Corporation for the construction and purchase of Washington Parish Energy Center, which consists of two natural gas-fired combustion turbine units with a total nominal capacity of approximately 361 MW. In November 2020, Entergy Louisiana completed the purchase, as approved by the LPSC, of the Washington Parish Energy Center. The total investment including transmission and other related costs, is approximately $261 million, including a payment of $222 million to purchase the plant.

Choctaw Generating Station

In October 2019, Entergy Mississippi purchased the Choctaw Generating Station, an 810 MW natural gas fired combined-cycle turbine plant located near French Camp, Mississippi, from a subsidiary of GenOn Energy Inc. The purchase price for the Choctaw Generating Station was approximately $305 million.

Dispositions

Indian Point Energy Center

In April 2019, Entergy entered into an agreement to sell, directly or indirectly, 100% of the equity interests in the subsidiaries that own Indian Point 1, Indian Point 2, and Indian Point 3, after Indian Point 3 had been shut down and defueled, to a Holtec International subsidiary. In November 2020 the NRC approved the sale of the plant to Holtec. Indian Point 3 was shut down in April 2021 and defueled in May 2021. In May 2021 the New York State Public Service Commission approved the sale of the plant to Holtec. The transaction closed in May 2021. The sale included the transfer of the licenses, spent fuel, decommissioning liabilities, and nuclear decommissioning trusts for the three units. The transaction resulted in a charge of $340 million ($268 million net-of-tax) in the second quarter of 2021. The disposition-date fair value of the nuclear decommissioning trust funds was approximately $2,387 million and the disposition-date fair value of the asset retirement obligations was $1,996 million. The transaction also included materials and supplies and prepaid assets.
Pilgrim

In July 2018, Entergy entered into a purchase and sale agreement with Holtec International to sell to a Holtec subsidiary 100% of the equity interests in Entergy Nuclear Generation Company, the owner of the Pilgrim plant. In August 2019 the NRC approved the sale of the plant to Holtec. The transaction closed in August 2019 for a purchase price of $1,000 (subject to adjustments for net liabilities and other amounts). The sale included the transfer of the Pilgrim nuclear decommissioning trust and the asset retirement obligation for spent fuel management and plant decommissioning. The transaction resulted in a loss of $190 million ($156 million net-of-tax) in the third quarter 2019. The disposition-date fair value of the nuclear decommissioning trust fund was approximately $1,030 million and the disposition-date fair value of the asset retirement obligation was $837 million. The transaction also included property, plant, and equipment with a net book value of zero, materials and supplies, and prepaid assets.

Vermont Yankee

In November 2016, Entergy entered into an agreement to sell 100% of the membership interests in Entergy Nuclear Vermont Yankee, LLC to a subsidiary of NorthStar. Entergy Nuclear Vermont Yankee was the owner of the Vermont Yankee plant. The sale of Entergy Nuclear Vermont Yankee to NorthStar included the transfer of the nuclear decommissioning trust fund and the asset retirement obligation for the spent fuel management and decommissioning of the plant.

In March 2018, Entergy and NorthStar entered into a settlement agreement and a Memorandum of Understanding with State of Vermont agencies and other interested parties that set forth the terms on which the agencies and parties support the Vermont Public Utility Commission’s approval of the transaction. The agreements provide additional financial assurance for decommissioning, spent fuel management and site restoration, and detail the site restoration standards. In October 2018 the NRC issued an order approving the application to transfer Vermont Yankee’s license to NorthStar for decommissioning. In December 2018 the Vermont Public Utility Commission issued an order approving the transaction consistent with the Memorandum of Understanding’s terms. On January 11, 2019, Entergy and NorthStar closed the transaction.

Entergy Nuclear Vermont Yankee had an outstanding credit facility that was used to pay for dry fuel storage costs. This credit facility was guaranteed by Entergy Corporation. A subsidiary of Entergy assumed the obligations under the credit facility, which remains outstanding. At the closing of the sale transaction, NorthStar caused Entergy Nuclear Vermont Yankee, renamed NorthStar Vermont Yankee, to issue a $139 million promissory note to the Entergy subsidiary that assumed the credit facility obligations. The amount of the note included the balance outstanding on the credit facility, as well as borrowing fees and costs incurred by Entergy in connection with the credit facility.

With the receipt of the NRC and Vermont Public Utility Commission approvals and the resolution among the parties of the significant conditions of the sale, Entergy concluded that as of December 31, 2018, Vermont Yankee was in held for sale status. Entergy accordingly evaluated the Vermont Yankee asset retirement obligation in light of the terms of the sale transaction and evaluated the remaining values of the Vermont Yankee assets. These evaluations resulted in an increase in the asset retirement obligation and $173 million of asset impairment and related other charges in the fourth quarter 2018. Upon closing of the transaction in January 2019, the Vermont Yankee decommissioning trust, along with the decommissioning obligation for the plant, was transferred to NorthStar.

The Vermont Yankee spent fuel disposal contract was assigned to NorthStar as part of the transaction. The Vermont Yankee transaction resulted in Entergy generating a net deferred tax asset in January 2019.  The deferred tax asset could not be fully realized by Entergy in the first quarter of 2019; accordingly, Entergy accrued a net tax expense of $29 million on the disposition of Vermont Yankee. The transaction also resulted in other charges of $5.4 million ($4.2 million net-of-tax) in the first quarter 2019.
Impairment of Long-lived Assets

2019, 2020, and 2021 Impairments

Entergy continues to execute its strategy to shut down and sell all of the remaining plants in Entergy Wholesale Commodities’ merchant nuclear fleet, with a planned shutdown of the only remaining operating plant, Palisades, by May 31, 2022. The other five Entergy Wholesale Commodities’ nuclear plants, FitzPatrick, Vermont Yankee, Pilgrim, Indian Point 2, and Indian Point 3, have been sold. The FitzPatrick plant was classified as held-for-sale at December 31, 2016, and subsequently sold to Exelon in March 2017. The Vermont Yankee plant was classified as held-for-sale at December 31, 2018, and subsequently sold to NorthStar on January 11, 2019. The Pilgrim plant was sold to Holtec International on August 26, 2019. The Indian Point 2 and Indian Point 3 plants were sold to Holtec International on May 28, 2021.

Entergy Wholesale Commodities incurred $7 million in 2021, $19 million in 2020, and $100 million in 2019 of impairment charges primarily related to nuclear fuel spending, nuclear refueling outage spending, and expenditures for capital assets. These costs were charged to expense as incurred as a result of the impaired fair value of the Entergy Wholesale Commodities nuclear plants’ long-lived assets due to the significantly reduced remaining estimated operating lives associated with management’s strategy to exit the Entergy Wholesale Commodities merchant power business.

With respect to Palisades, Entergy and Consumers Energy had agreed to amend the existing PPA so that it would terminate early, on May 31, 2018. In September 2017, however, Entergy and Consumers Energy agreed to terminate the PPA amendment agreement. Entergy continues to operate Palisades under the current PPA with Consumers Energy, instead of shutting down in the fall of 2018 as previously planned. Entergy intends to shut down the Palisades plant permanently no later than May 31, 2022. As a result of the change in expected operating life of the Palisades plant, the expected probability-weighted undiscounted net cash flows as of September 30, 2017 exceeded the carrying value of the plant and related assets. Accordingly, nuclear fuel spending, nuclear refueling outage spending, and expenditures for capital assets incurred at Palisades after September 30, 2017 are no longer charged to expense as incurred, but recorded as assets and depreciated or amortized, subject to the typical periodic impairment reviews prescribed in the accounting rules.

The impairments and other related charges are recorded as a separate line item in Entergy’s consolidated statements of operations and are included within the results of the Entergy Wholesale Commodities segment. In addition to the impairments and other related charges, Entergy expects to incur additional charges through mid-2022 associated with these strategic transactions. See Note 13 to the financial statements for further discussion of these additional charges.
     
Entergy Mississippi [Member]                                      
Business Acquisition [Line Items]                                      
Revenue from Contract with Customer, Excluding Assessed Tax                               $ 1,406,346,000 1,247,854,000 1,323,043,000  
Net Book Value   6,613,109,000                           6,613,109,000 6,084,730,000    
Asset Retirement Obligation   10,300,000                   9,700,000       10,300,000 9,800,000 9,700,000  
Assets, Fair Value Disclosure   96,800,000                           $ 96,800,000 65,200,000    
Acquisitions And Dispositions                               ACQUISITIONS, DISPOSITIONS, AND IMPAIRMENT OF LONG-LIVED ASSETS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy Texas)
Acquisitions

Searcy Solar Facility

In March 2019, Entergy Arkansas entered into a build-own-transfer agreement for the purchase of an approximately 100 MW solar energy facility to be sited on approximately 800 acres in White County near Searcy, Arkansas. The project, Searcy Solar facility, was being constructed by a subsidiary of NextEra Energy Resources. In April 2020 the APSC issued an order approving Entergy Arkansas’s acquisition of the Searcy Solar facility as
being in the public interest. In May 2021, Entergy Arkansas filed with the APSC an application seeking to amend its certificate for the Searcy Solar facility to allow for the use of a tax equity partnership to acquire and own the facility. The tax equity partnership structure is expected to reduce costs and yield incremental net benefits to customers beyond those expected under the build-own-transfer structure alone. The APSC approved Entergy Arkansas’s tax equity partnership request in September 2021. AR Searcy Partnership, LLC was formed for the tax equity partnership with Entergy Arkansas as its managing member. In November 2021 both Entergy Arkansas and the tax equity investor made capital contributions to the tax equity partnership that were then used to acquire the facility. Upon substantial completion of the facility in December 2021, the tax equity partnership completed the purchase of the Searcy Solar facility. The purchase price for the Searcy Solar facility was approximately $133 million, which includes a final payment of approximately $1 million to be made in 2022. See Note 1 to the financial statements for further discussion of the HLBV method of accounting used to account for the investment in AR Searcy Partnership, LLC.

Hardin County Peaking Facility

In June 2021, Entergy Texas purchased the Hardin County Peaking Facility, an existing 147 MW simple-cycle gas-fired peaking power plant in Kountze, Texas, from East Texas Electric Cooperative, Inc. In addition, also in June 2021, Entergy Texas sold a 7.56% partial interest in the Montgomery County Power Station to East Texas Electric Cooperative, Inc. for approximately $68 million. The two interdependent transactions were approved by the PUCT in April 2021. The purchase price for the Hardin County Peaking Facility was approximately $37 million.

Washington Parish Energy Center

In April 2017, Entergy Louisiana entered into an agreement with a subsidiary of Calpine Corporation for the construction and purchase of Washington Parish Energy Center, which consists of two natural gas-fired combustion turbine units with a total nominal capacity of approximately 361 MW. In November 2020, Entergy Louisiana completed the purchase, as approved by the LPSC, of the Washington Parish Energy Center. The total investment including transmission and other related costs, is approximately $261 million, including a payment of $222 million to purchase the plant.

Choctaw Generating Station

In October 2019, Entergy Mississippi purchased the Choctaw Generating Station, an 810 MW natural gas fired combined-cycle turbine plant located near French Camp, Mississippi, from a subsidiary of GenOn Energy Inc. The purchase price for the Choctaw Generating Station was approximately $305 million.

Dispositions

Indian Point Energy Center

In April 2019, Entergy entered into an agreement to sell, directly or indirectly, 100% of the equity interests in the subsidiaries that own Indian Point 1, Indian Point 2, and Indian Point 3, after Indian Point 3 had been shut down and defueled, to a Holtec International subsidiary. In November 2020 the NRC approved the sale of the plant to Holtec. Indian Point 3 was shut down in April 2021 and defueled in May 2021. In May 2021 the New York State Public Service Commission approved the sale of the plant to Holtec. The transaction closed in May 2021. The sale included the transfer of the licenses, spent fuel, decommissioning liabilities, and nuclear decommissioning trusts for the three units. The transaction resulted in a charge of $340 million ($268 million net-of-tax) in the second quarter of 2021. The disposition-date fair value of the nuclear decommissioning trust funds was approximately $2,387 million and the disposition-date fair value of the asset retirement obligations was $1,996 million. The transaction also included materials and supplies and prepaid assets.
Pilgrim

In July 2018, Entergy entered into a purchase and sale agreement with Holtec International to sell to a Holtec subsidiary 100% of the equity interests in Entergy Nuclear Generation Company, the owner of the Pilgrim plant. In August 2019 the NRC approved the sale of the plant to Holtec. The transaction closed in August 2019 for a purchase price of $1,000 (subject to adjustments for net liabilities and other amounts). The sale included the transfer of the Pilgrim nuclear decommissioning trust and the asset retirement obligation for spent fuel management and plant decommissioning. The transaction resulted in a loss of $190 million ($156 million net-of-tax) in the third quarter 2019. The disposition-date fair value of the nuclear decommissioning trust fund was approximately $1,030 million and the disposition-date fair value of the asset retirement obligation was $837 million. The transaction also included property, plant, and equipment with a net book value of zero, materials and supplies, and prepaid assets.

Vermont Yankee

In November 2016, Entergy entered into an agreement to sell 100% of the membership interests in Entergy Nuclear Vermont Yankee, LLC to a subsidiary of NorthStar. Entergy Nuclear Vermont Yankee was the owner of the Vermont Yankee plant. The sale of Entergy Nuclear Vermont Yankee to NorthStar included the transfer of the nuclear decommissioning trust fund and the asset retirement obligation for the spent fuel management and decommissioning of the plant.

In March 2018, Entergy and NorthStar entered into a settlement agreement and a Memorandum of Understanding with State of Vermont agencies and other interested parties that set forth the terms on which the agencies and parties support the Vermont Public Utility Commission’s approval of the transaction. The agreements provide additional financial assurance for decommissioning, spent fuel management and site restoration, and detail the site restoration standards. In October 2018 the NRC issued an order approving the application to transfer Vermont Yankee’s license to NorthStar for decommissioning. In December 2018 the Vermont Public Utility Commission issued an order approving the transaction consistent with the Memorandum of Understanding’s terms. On January 11, 2019, Entergy and NorthStar closed the transaction.

Entergy Nuclear Vermont Yankee had an outstanding credit facility that was used to pay for dry fuel storage costs. This credit facility was guaranteed by Entergy Corporation. A subsidiary of Entergy assumed the obligations under the credit facility, which remains outstanding. At the closing of the sale transaction, NorthStar caused Entergy Nuclear Vermont Yankee, renamed NorthStar Vermont Yankee, to issue a $139 million promissory note to the Entergy subsidiary that assumed the credit facility obligations. The amount of the note included the balance outstanding on the credit facility, as well as borrowing fees and costs incurred by Entergy in connection with the credit facility.

With the receipt of the NRC and Vermont Public Utility Commission approvals and the resolution among the parties of the significant conditions of the sale, Entergy concluded that as of December 31, 2018, Vermont Yankee was in held for sale status. Entergy accordingly evaluated the Vermont Yankee asset retirement obligation in light of the terms of the sale transaction and evaluated the remaining values of the Vermont Yankee assets. These evaluations resulted in an increase in the asset retirement obligation and $173 million of asset impairment and related other charges in the fourth quarter 2018. Upon closing of the transaction in January 2019, the Vermont Yankee decommissioning trust, along with the decommissioning obligation for the plant, was transferred to NorthStar.

The Vermont Yankee spent fuel disposal contract was assigned to NorthStar as part of the transaction. The Vermont Yankee transaction resulted in Entergy generating a net deferred tax asset in January 2019.  The deferred tax asset could not be fully realized by Entergy in the first quarter of 2019; accordingly, Entergy accrued a net tax expense of $29 million on the disposition of Vermont Yankee. The transaction also resulted in other charges of $5.4 million ($4.2 million net-of-tax) in the first quarter 2019.
Impairment of Long-lived Assets

2019, 2020, and 2021 Impairments

Entergy continues to execute its strategy to shut down and sell all of the remaining plants in Entergy Wholesale Commodities’ merchant nuclear fleet, with a planned shutdown of the only remaining operating plant, Palisades, by May 31, 2022. The other five Entergy Wholesale Commodities’ nuclear plants, FitzPatrick, Vermont Yankee, Pilgrim, Indian Point 2, and Indian Point 3, have been sold. The FitzPatrick plant was classified as held-for-sale at December 31, 2016, and subsequently sold to Exelon in March 2017. The Vermont Yankee plant was classified as held-for-sale at December 31, 2018, and subsequently sold to NorthStar on January 11, 2019. The Pilgrim plant was sold to Holtec International on August 26, 2019. The Indian Point 2 and Indian Point 3 plants were sold to Holtec International on May 28, 2021.

Entergy Wholesale Commodities incurred $7 million in 2021, $19 million in 2020, and $100 million in 2019 of impairment charges primarily related to nuclear fuel spending, nuclear refueling outage spending, and expenditures for capital assets. These costs were charged to expense as incurred as a result of the impaired fair value of the Entergy Wholesale Commodities nuclear plants’ long-lived assets due to the significantly reduced remaining estimated operating lives associated with management’s strategy to exit the Entergy Wholesale Commodities merchant power business.

With respect to Palisades, Entergy and Consumers Energy had agreed to amend the existing PPA so that it would terminate early, on May 31, 2018. In September 2017, however, Entergy and Consumers Energy agreed to terminate the PPA amendment agreement. Entergy continues to operate Palisades under the current PPA with Consumers Energy, instead of shutting down in the fall of 2018 as previously planned. Entergy intends to shut down the Palisades plant permanently no later than May 31, 2022. As a result of the change in expected operating life of the Palisades plant, the expected probability-weighted undiscounted net cash flows as of September 30, 2017 exceeded the carrying value of the plant and related assets. Accordingly, nuclear fuel spending, nuclear refueling outage spending, and expenditures for capital assets incurred at Palisades after September 30, 2017 are no longer charged to expense as incurred, but recorded as assets and depreciated or amortized, subject to the typical periodic impairment reviews prescribed in the accounting rules.

The impairments and other related charges are recorded as a separate line item in Entergy’s consolidated statements of operations and are included within the results of the Entergy Wholesale Commodities segment. In addition to the impairments and other related charges, Entergy expects to incur additional charges through mid-2022 associated with these strategic transactions. See Note 13 to the financial statements for further discussion of these additional charges.
     
Entergy Nuclear Generation Company [Member]                                      
Business Acquisition [Line Items]                                      
Gain (Loss) on Disposition of Property Plant Equipment, Excluding Oil and Gas Property and Timber Property             $ 190,000,000                        
Decommissioning Trust Fair Values             1,030,000,000                        
Net Book Value             0                        
Asset Retirement Obligation             837,000,000                        
Proceeds from sale of business             1,000                        
Percentage of Undivided Ownership Interest                   100.00%                  
Reduction to income tax expense             $ 156,000,000                        
Entergy Wholesale Commodities [Member]                                      
Business Acquisition [Line Items]                                      
Reduction to income tax expense                       174,000,000              
Entergy Texas [Member]                                      
Business Acquisition [Line Items]                                      
Revenue from Contract with Customer, Excluding Assessed Tax                               $ 1,902,511,000 1,587,125,000 1,488,955,000  
Proceeds from Sale of Productive Assets                               67,920,000 0 0  
Net Book Value   7,181,567,000                           7,181,567,000 6,007,687,000    
Asset Retirement Obligation   8,500,000                   $ 7,600,000       8,500,000 8,100,000 7,600,000  
Assets, Fair Value Disclosure   27,400,000                           27,400,000 286,400,000    
Equity Method Investments   $ 300,000                           $ 300,000 349,000    
Acquisitions And Dispositions                               ACQUISITIONS, DISPOSITIONS, AND IMPAIRMENT OF LONG-LIVED ASSETS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy Texas)
Acquisitions

Searcy Solar Facility

In March 2019, Entergy Arkansas entered into a build-own-transfer agreement for the purchase of an approximately 100 MW solar energy facility to be sited on approximately 800 acres in White County near Searcy, Arkansas. The project, Searcy Solar facility, was being constructed by a subsidiary of NextEra Energy Resources. In April 2020 the APSC issued an order approving Entergy Arkansas’s acquisition of the Searcy Solar facility as
being in the public interest. In May 2021, Entergy Arkansas filed with the APSC an application seeking to amend its certificate for the Searcy Solar facility to allow for the use of a tax equity partnership to acquire and own the facility. The tax equity partnership structure is expected to reduce costs and yield incremental net benefits to customers beyond those expected under the build-own-transfer structure alone. The APSC approved Entergy Arkansas’s tax equity partnership request in September 2021. AR Searcy Partnership, LLC was formed for the tax equity partnership with Entergy Arkansas as its managing member. In November 2021 both Entergy Arkansas and the tax equity investor made capital contributions to the tax equity partnership that were then used to acquire the facility. Upon substantial completion of the facility in December 2021, the tax equity partnership completed the purchase of the Searcy Solar facility. The purchase price for the Searcy Solar facility was approximately $133 million, which includes a final payment of approximately $1 million to be made in 2022. See Note 1 to the financial statements for further discussion of the HLBV method of accounting used to account for the investment in AR Searcy Partnership, LLC.

Hardin County Peaking Facility

In June 2021, Entergy Texas purchased the Hardin County Peaking Facility, an existing 147 MW simple-cycle gas-fired peaking power plant in Kountze, Texas, from East Texas Electric Cooperative, Inc. In addition, also in June 2021, Entergy Texas sold a 7.56% partial interest in the Montgomery County Power Station to East Texas Electric Cooperative, Inc. for approximately $68 million. The two interdependent transactions were approved by the PUCT in April 2021. The purchase price for the Hardin County Peaking Facility was approximately $37 million.

Washington Parish Energy Center

In April 2017, Entergy Louisiana entered into an agreement with a subsidiary of Calpine Corporation for the construction and purchase of Washington Parish Energy Center, which consists of two natural gas-fired combustion turbine units with a total nominal capacity of approximately 361 MW. In November 2020, Entergy Louisiana completed the purchase, as approved by the LPSC, of the Washington Parish Energy Center. The total investment including transmission and other related costs, is approximately $261 million, including a payment of $222 million to purchase the plant.

Choctaw Generating Station

In October 2019, Entergy Mississippi purchased the Choctaw Generating Station, an 810 MW natural gas fired combined-cycle turbine plant located near French Camp, Mississippi, from a subsidiary of GenOn Energy Inc. The purchase price for the Choctaw Generating Station was approximately $305 million.

Dispositions

Indian Point Energy Center

In April 2019, Entergy entered into an agreement to sell, directly or indirectly, 100% of the equity interests in the subsidiaries that own Indian Point 1, Indian Point 2, and Indian Point 3, after Indian Point 3 had been shut down and defueled, to a Holtec International subsidiary. In November 2020 the NRC approved the sale of the plant to Holtec. Indian Point 3 was shut down in April 2021 and defueled in May 2021. In May 2021 the New York State Public Service Commission approved the sale of the plant to Holtec. The transaction closed in May 2021. The sale included the transfer of the licenses, spent fuel, decommissioning liabilities, and nuclear decommissioning trusts for the three units. The transaction resulted in a charge of $340 million ($268 million net-of-tax) in the second quarter of 2021. The disposition-date fair value of the nuclear decommissioning trust funds was approximately $2,387 million and the disposition-date fair value of the asset retirement obligations was $1,996 million. The transaction also included materials and supplies and prepaid assets.
Pilgrim

In July 2018, Entergy entered into a purchase and sale agreement with Holtec International to sell to a Holtec subsidiary 100% of the equity interests in Entergy Nuclear Generation Company, the owner of the Pilgrim plant. In August 2019 the NRC approved the sale of the plant to Holtec. The transaction closed in August 2019 for a purchase price of $1,000 (subject to adjustments for net liabilities and other amounts). The sale included the transfer of the Pilgrim nuclear decommissioning trust and the asset retirement obligation for spent fuel management and plant decommissioning. The transaction resulted in a loss of $190 million ($156 million net-of-tax) in the third quarter 2019. The disposition-date fair value of the nuclear decommissioning trust fund was approximately $1,030 million and the disposition-date fair value of the asset retirement obligation was $837 million. The transaction also included property, plant, and equipment with a net book value of zero, materials and supplies, and prepaid assets.

Vermont Yankee

In November 2016, Entergy entered into an agreement to sell 100% of the membership interests in Entergy Nuclear Vermont Yankee, LLC to a subsidiary of NorthStar. Entergy Nuclear Vermont Yankee was the owner of the Vermont Yankee plant. The sale of Entergy Nuclear Vermont Yankee to NorthStar included the transfer of the nuclear decommissioning trust fund and the asset retirement obligation for the spent fuel management and decommissioning of the plant.

In March 2018, Entergy and NorthStar entered into a settlement agreement and a Memorandum of Understanding with State of Vermont agencies and other interested parties that set forth the terms on which the agencies and parties support the Vermont Public Utility Commission’s approval of the transaction. The agreements provide additional financial assurance for decommissioning, spent fuel management and site restoration, and detail the site restoration standards. In October 2018 the NRC issued an order approving the application to transfer Vermont Yankee’s license to NorthStar for decommissioning. In December 2018 the Vermont Public Utility Commission issued an order approving the transaction consistent with the Memorandum of Understanding’s terms. On January 11, 2019, Entergy and NorthStar closed the transaction.

Entergy Nuclear Vermont Yankee had an outstanding credit facility that was used to pay for dry fuel storage costs. This credit facility was guaranteed by Entergy Corporation. A subsidiary of Entergy assumed the obligations under the credit facility, which remains outstanding. At the closing of the sale transaction, NorthStar caused Entergy Nuclear Vermont Yankee, renamed NorthStar Vermont Yankee, to issue a $139 million promissory note to the Entergy subsidiary that assumed the credit facility obligations. The amount of the note included the balance outstanding on the credit facility, as well as borrowing fees and costs incurred by Entergy in connection with the credit facility.

With the receipt of the NRC and Vermont Public Utility Commission approvals and the resolution among the parties of the significant conditions of the sale, Entergy concluded that as of December 31, 2018, Vermont Yankee was in held for sale status. Entergy accordingly evaluated the Vermont Yankee asset retirement obligation in light of the terms of the sale transaction and evaluated the remaining values of the Vermont Yankee assets. These evaluations resulted in an increase in the asset retirement obligation and $173 million of asset impairment and related other charges in the fourth quarter 2018. Upon closing of the transaction in January 2019, the Vermont Yankee decommissioning trust, along with the decommissioning obligation for the plant, was transferred to NorthStar.

The Vermont Yankee spent fuel disposal contract was assigned to NorthStar as part of the transaction. The Vermont Yankee transaction resulted in Entergy generating a net deferred tax asset in January 2019.  The deferred tax asset could not be fully realized by Entergy in the first quarter of 2019; accordingly, Entergy accrued a net tax expense of $29 million on the disposition of Vermont Yankee. The transaction also resulted in other charges of $5.4 million ($4.2 million net-of-tax) in the first quarter 2019.
Impairment of Long-lived Assets

2019, 2020, and 2021 Impairments

Entergy continues to execute its strategy to shut down and sell all of the remaining plants in Entergy Wholesale Commodities’ merchant nuclear fleet, with a planned shutdown of the only remaining operating plant, Palisades, by May 31, 2022. The other five Entergy Wholesale Commodities’ nuclear plants, FitzPatrick, Vermont Yankee, Pilgrim, Indian Point 2, and Indian Point 3, have been sold. The FitzPatrick plant was classified as held-for-sale at December 31, 2016, and subsequently sold to Exelon in March 2017. The Vermont Yankee plant was classified as held-for-sale at December 31, 2018, and subsequently sold to NorthStar on January 11, 2019. The Pilgrim plant was sold to Holtec International on August 26, 2019. The Indian Point 2 and Indian Point 3 plants were sold to Holtec International on May 28, 2021.

Entergy Wholesale Commodities incurred $7 million in 2021, $19 million in 2020, and $100 million in 2019 of impairment charges primarily related to nuclear fuel spending, nuclear refueling outage spending, and expenditures for capital assets. These costs were charged to expense as incurred as a result of the impaired fair value of the Entergy Wholesale Commodities nuclear plants’ long-lived assets due to the significantly reduced remaining estimated operating lives associated with management’s strategy to exit the Entergy Wholesale Commodities merchant power business.

With respect to Palisades, Entergy and Consumers Energy had agreed to amend the existing PPA so that it would terminate early, on May 31, 2018. In September 2017, however, Entergy and Consumers Energy agreed to terminate the PPA amendment agreement. Entergy continues to operate Palisades under the current PPA with Consumers Energy, instead of shutting down in the fall of 2018 as previously planned. Entergy intends to shut down the Palisades plant permanently no later than May 31, 2022. As a result of the change in expected operating life of the Palisades plant, the expected probability-weighted undiscounted net cash flows as of September 30, 2017 exceeded the carrying value of the plant and related assets. Accordingly, nuclear fuel spending, nuclear refueling outage spending, and expenditures for capital assets incurred at Palisades after September 30, 2017 are no longer charged to expense as incurred, but recorded as assets and depreciated or amortized, subject to the typical periodic impairment reviews prescribed in the accounting rules.

The impairments and other related charges are recorded as a separate line item in Entergy’s consolidated statements of operations and are included within the results of the Entergy Wholesale Commodities segment. In addition to the impairments and other related charges, Entergy expects to incur additional charges through mid-2022 associated with these strategic transactions. See Note 13 to the financial statements for further discussion of these additional charges.
     
Entergy Wholesale Commodities [Member]                                      
Business Acquisition [Line Items]                                      
Payments to Acquire Productive Assets                               $ 12,100,000 54,455,000 104,300,000  
Asset Write-Offs, Impairments, And Related Charges                               264,000,000 19,000,000 290,000,000  
Asset impairment primarily related to nuclear fuel spending, nuclear refueling outage spending, and expenditures for capital assets                               $ 7,000,000 19,000,000 100,000,000  
Entergy Wholesale Commodities [Member] | Vermont Yankee [Member]                                      
Business Acquisition [Line Items]                                      
Percent of Equity Interest to be included in nuclear plant purchase and sale agreement                     100.00%                
Palisades [Member] | Entergy Wholesale Commodities [Member]                                      
Business Acquisition [Line Items]                                      
Average Price Under PPA | $ / MWh                               51      
Amortization of Intangible Assets                               $ 12,000,000 $ 11,000,000 $ 10,000,000  
Palisades [Member] | Entergy Wholesale Commodities [Member] | Subsequent Event [Member]                                      
Business Acquisition [Line Items]                                      
Accelerated Finite Lived Intangible Assets Amortization Expenses due to termination of PPA                             $ 5,000,000        
Vermont Yankee [Member] | Entergy Louisiana [Member]                                      
Business Acquisition [Line Items]                                      
Capacity Of Power Plant Unit | MW         361                            
Payments to Acquire Productive Assets         $ 261,000,000                            
Payments to Acquire Property, Plant, and Equipment         $ 222,000,000                            
Choctaw [Member] | Entergy Mississippi [Member]                                      
Business Acquisition [Line Items]                                      
Capacity Of Power Plant Unit | MW           810                          
Payments to Acquire Productive Assets           $ 305,000,000                          
Vermont Yankee [Member]                                      
Business Acquisition [Line Items]                                      
After-Tax Asset Impairment Charge                         4,200,000            
Discontinued Operation, Tax Effect of Discontinued Operation                         29,000,000            
Restructuring Costs and Asset Impairment Charges                         $ 5,400,000            
Vermont Yankee [Member] | Entergy Wholesale Commodities [Member]                                      
Business Acquisition [Line Items]                                      
Increase (Decrease) in Notes Payable, Current                 $ 139,000,000                    
Asset Impairment Charges                           $ 173,000,000          
Montgomery County Power Station | Entergy Texas [Member]                                      
Business Acquisition [Line Items]                                      
Proceeds from Sale of Productive Assets     $ 68,000,000                                
Percentage of Undivided Ownership Interest     7.56%                                
Searcy Solar Facility | Entergy Arkansas [Member]                                      
Business Acquisition [Line Items]                                      
Capacity Of Power Plant Unit | MW   100                                  
Searcy Solar Facility | Entergy Arkansas [Member] | AR Searcy Partnership, LLC                                      
Business Acquisition [Line Items]                                      
Payments to Acquire Productive Assets   $ 133,000,000                                  
Searcy Solar Facility | Entergy Arkansas [Member] | Subsequent Event [Member] | AR Searcy Partnership, LLC                                      
Business Acquisition [Line Items]                                      
Payments to Acquire Productive Assets $ 1,000,000                                    
Indian Point Energy Center | Entergy Wholesale Commodities [Member]                                      
Business Acquisition [Line Items]                                      
Decommissioning Trust Fair Values                                     $ 2,387,000,000
Asset Retirement Obligation                                     $ 1,996,000,000
Percentage of Undivided Ownership Interest               100.00%                      
Gain (Loss) on Disposition of Assets       $ 340,000,000                              
Gain (Loss) on Disposition of Assets (Net-Of-Tax)       $ 268,000,000                              
Hardin County Peaking Facility | Entergy Texas [Member]                                      
Business Acquisition [Line Items]                                      
Capacity Of Power Plant Unit | MW     147                                
Payments to Acquire Productive Assets     $ 37,000,000