Rate And Regulatory Matters RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)
Regulatory Assets and Regulatory Liabilities

Regulatory assets represent probable future revenues associated with costs that Entergy expects to recover from customers through the regulatory ratemaking process under which the Utility business operates. Regulatory liabilities represent probable future reductions in revenues associated with amounts that Entergy expects to benefit customers through the regulatory ratemaking process under which the Utility business operates. In addition to the regulatory assets and liabilities that are specifically disclosed on the face of the balance sheets, the tables below provide detail of “Other regulatory assets” and “Other regulatory liabilities” that are included on Entergy’s and the Registrant Subsidiaries’ balance sheets as of December 31, 2021 and 2020:

Other Regulatory Assets

Entergy
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
$2,327.7 $3,027.5 
Removal costs (Note 9)
1,488.8 893.8 
Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 2 - Hurricane Ida and Storm Cost Recovery Filings with Retail Regulators and Note 5 - Securitization Bonds)
993.6 379.2 
Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
935.5 1,018.9 
Retired electric and gas meters - recovered through retail rates as determined by retail regulators
179.4 192.1 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
133.1 105.7 
Opportunity Sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding) (b)
131.8 131.8 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
113.2 16.9 
Unamortized loss on reacquired debt - recovered over term of debt
74.7 79.2 
Retail rate deferrals - recovered through formula rates or rate riders as rates are redetermined by retail regulators
66.1 66.0 
Attorney General litigation costs - recovered over a six-year period through March 2026 (b)
20.5 25.3 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
19.0 — 
New nuclear generation development costs - recovery through formula rate plan December 2014 through November 2022 (b)
6.8 14.2 
Other123.1 125.9 
Entergy Total$6,613.3 $6,076.5 
Entergy Arkansas
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
$640.0 $831.5 
Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
489.2 479.3 
Removal costs (Note 9)
224.3 212.6 
Opportunity sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding) (b)
131.8 131.8 
Retired electric meters - recovered over 15-year period through March 2034
43.4 46.9 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
39.8 9.5 
Storm damage costs - recovered either through securitization or retail rates (Note 5 - Entergy Arkansas Securitization Bonds)
39.3 42.7 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
32.6 10.5 
Unamortized loss on reacquired debt - recovered over term of debt
23.1 24.7 
ANO Fukushima and Flood Barrier costs - recovered through retail rates through February 2026 (Note 2 - Retail Rate Proceedings) (b)
7.3 9.1 
Retail rate deferrals - recovered through rate riders as rates are redetermined annually (b)
1.0 12.6 
Other17.9 21.2 
Entergy Arkansas Total$1,689.7 $1,832.4 
Entergy Louisiana
 20212020
 (In Millions)
Removal costs (Note 9)
$848.2 $302.5 
Storm damage costs, including hurricane costs - recovery expected through retail rates and securitization (Note 2 - Hurricane Ida and Storm Cost Recovery Filings with Retail Regulators)
773.6 94.0 
Pension & postretirement costs (Note 11 - Qualified Pension Plans and Non-Qualified Pension Plans) (a)
592.7 799.4 
Asset Retirement Obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
286.6 299.0 
Retired electric meters - recovered over a 22-year period through July 2041
91.7 96.4 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
56.3 48.8 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
55.0 5.4 
Unamortized loss on reacquired debt - recovered over term of debt
26.9 26.6 
New nuclear generation development costs - recovery through formula rate plan December 2014 through November 2022 (b)
6.7 14.0 
Other39.0 40.0 
Entergy Louisiana Total$2,776.7 $1,726.1 

Entergy Mississippi
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
$175.4 $242.7 
Removal costs (Note 9)
136.8 107.3 
Retail rate deferrals - returned through formula rates or rate riders as rates are redetermined annually
48.1 44.3 
Attorney General litigation costs - recovered over a six-year period through March 2026 (b)
20.5 25.3 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
19.0 — 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
15.0 19.2 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
13.8 2.0 
Unamortized loss on reacquired debt - recovered over term of debt
12.2 13.5 
Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
8.4 7.9 
Other13.2 5.1 
Entergy Mississippi Total$462.4 $467.3 
Entergy New Orleans
 20212020
 (In Millions)
Removal costs (Note 9)
$91.7 $63.2 
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
44.9 75.7 
Storm damage costs, including hurricane costs - recovered through securitization or retail rates (Note 2 - Storm Cost Recovery Filings with Retail Regulators and Note 5 - Entergy New Orleans Securitization Bonds - Hurricane Isaac)
31.2 55.2 
Retired meters - recovered over a 12-year period through July 2031 (b)
19.6 21.7 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
17.4 14.3 
Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
5.4 5.2 
Unamortized loss on reacquired debt - recovered over term of debt
1.6 1.9 
Other36.8 29.6 
Entergy New Orleans Total$248.6 $266.8 

Entergy Texas
 20212020
 (In Millions)
Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 2 - Storm Cost Recovery Filings with Retail Regulators and Note 5 - Entergy Texas Securitization Bonds - Hurricane Rita and Entergy Texas Securitization Bonds - Hurricane Ike and Hurricane Gustav)
$143.1 $187.3 
Removal costs (Note 9)
98.1 115.3 
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
96.0 140.1 
Retired electric meters - recovered over 13-year period through February 2032
23.7 26.0 
Neches and Sabine costs - recovered over a 10-year period through September 2028 (Note 2 - Retail Rate Proceedings)
16.4 18.8 
Pension & postretirement benefits expense deferral - recovery period to be determined (Note 11 - Entergy Texas Reserve)
14.6 3.8 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
11.7 12.9 
Unamortized loss on reacquired debt - recovered over term of debt
9.8 10.5 
Other7.9 10.0 
Entergy Texas Total$421.3 $524.7 
System Energy
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans and Other Postretirement Benefits) (a)
$160.3 $217.8 
Asset retirement obligation - recovery dependent upon timing of decommissioning (Note 9) (a)
144.4 226.3 
Removal costs - recovered through depreciation rates (Note 9)
89.7 92.9 
Unamortized loss on reacquired debt - recovered over term of debt
1.1 2.0 
System Energy Total$395.5 $539.0 

(a)Does not earn a return on investment, but is offset by related liabilities.
(b)Does not earn a return on investment.

Hurricane Ida

In August 2021, Hurricane Ida caused extensive damage to the Entergy distribution and, to a lesser extent, transmission systems across Louisiana resulting in widespread power outages. Total restoration costs for the repair and/or replacement of the electrical system damaged by Hurricane Ida for Entergy Louisiana and Entergy New Orleans are currently estimated to be approximately $2.7 billion. Also, Utility revenues in 2021 were adversely affected by extended power outages resulting from the hurricane.

Entergy has recorded accounts payable for the estimated costs incurred that were necessary to return customers to service. Entergy recorded corresponding regulatory assets of approximately $1.1 billion, including $1 billion at Entergy Louisiana and $80 million at Entergy New Orleans, and construction work in progress of approximately $1.6 billion, including $1.5 billion at Entergy Louisiana and $120 million at Entergy New Orleans. Entergy recorded the regulatory assets in accordance with its accounting policies and based on the historic treatment of such costs in its service area because management believes that recovery through some form of regulatory mechanism is probable. There are well-established mechanisms and precedent for addressing these catastrophic events and providing for recovery of prudently incurred storm costs in accordance with applicable regulatory and legal principles. Because Entergy has not gone through the regulatory process regarding these storm costs, there is an element of risk, and Entergy is unable to predict with certainty the degree of success it may have in its recovery initiatives, the amount of restoration costs that it may ultimately recover, or the timing of such recovery.

Entergy is considering all available avenues to recover storm-related costs from Hurricane Ida, including federal government assistance and securitization financing. In September 2021, Entergy Louisiana filed an application at the LPSC seeking approval of certain ratemaking adjustments in connection with the issuance of approximately $1 billion of shorter-term mortgage bonds to provide interim financing for restoration costs associated with Hurricane Ida, which bonds were issued in October 2021. Also in September 2021, as discussed below in “Storm Cost Filings with Retail Regulators - Entergy Louisiana - Hurricane Laura, Hurricane Delta, Hurricane Zeta, Winter Storm Uri, and Hurricane Ida,” Entergy Louisiana sought approval for the creation and funding of a $1 billion restricted escrow account for Hurricane Ida restoration costs, subject to a subsequent prudence review. In September 2021, Entergy New Orleans withdrew $39 million from its funded storm reserves. Storm cost recovery or financing will be subject to review by applicable regulatory authorities. In February 2022, Entergy New Orleans filed with the City Council a securitization application requesting that the City Council review Entergy New Orleans’s storm reserve and increase the storm reserve funding level to $150 million, to be funded through securitization.
Other Regulatory Liabilities

Entergy
 20212020
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$1,993.3 $1,694.1 
Louisiana Act 55 financing savings obligation (Note 3) (b)
127.4 144.3 
Retail rate over-recovery - refunded through formula rate or rate riders as rates are redetermined annually
126.5 75.1 
Vidalia purchased power agreement (Note 8) (b)
106.2 115.7 
Grand Gulf sale-leaseback - (Note 5 - Grand Gulf Sale-Leaseback Transactions)
55.6 55.6 
Asset retirement obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
45.5 29.7 
Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4 44.4 
Internal restructuring guaranteed tax credits19.8 26.4 
Deferred tax equity partnership earnings (Note 1)
18.1 — 
Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates December 2015 through November 2024
16.0 21.5 
Advanced metering system (AMS) surcharge - return to customers dependent upon AMS spend
7.3 20.1 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
— 43.5 
Other83.7 53.5 
Entergy Total$2,643.8 $2,323.9 

Entergy Arkansas
 20212020
 (In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$685.4 $597.4 
Internal restructuring guaranteed customer credits19.8 26.4 
Retail rate rider over-recovery - refunded through rate riders as rates are redetermined annually
18.9 19.6 
Deferred tax equity partnership earnings (Note 1)
18.1 — 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
— 43.5 
Other1.1 — 
Entergy Arkansas Total$743.3 $686.9 
Entergy Louisiana
 20212020
 (In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$692.2 $567.7 
Louisiana Act 55 financing savings obligation (Note 3)
127.4 144.3 
Vidalia purchased power agreement (Note 8) (b)
106.2 115.7 
Asset retirement obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
45.5 29.7 
Retail rate rider over-recovery - refunded through rate riders as rates are determined annually
30.7 36.0 
Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates December 2015 through November 2024
16.0 21.5 
Derivative Instruments & Hedging Activities (Note 15)
11.4 — 
Other13.2 3.4 
Entergy Louisiana Total$1,042.6 $918.3 

Entergy Mississippi
 20212020
 (In Millions)
Retail rate rider over-recovery - refunded through rate riders as rates are redetermined annually
$34.2 $14.2 
Grand Gulf over-recovery - returned to customers through rate riders as rates are redetermined annually
15.1 1.0 
Other— 0.6 
Entergy Mississippi Total$49.3 $15.8 

Entergy Texas
 20212020
 (In Millions)
Retail refunds - return to customers to be determined
$22.8 $— 
Advanced metering system (AMS) surcharge - returned to customers dependent upon AMS spend
7.3 20.1 
Income tax rate change - refunded through a rate rider (Note 2 - Retail Rate Proceedings)
2.7 6.5 
Transition to competition costs - returned to customers through rate riders when rates are redetermined periodically
— 3.2 
Other 4.3 2.5 
Entergy Texas Total$37.1 $32.3 
System Energy
 20212020
 (In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$615.7 $529.0 
Grand Gulf sale-leaseback - (Note 5 - Grand Gulf Sale-Leaseback Transactions)
55.6 55.6 
Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4 44.4 
Grand Gulf sale-leaseback accumulated deferred income taxes (a)
25.6 25.7 
Entergy Mississippis accumulated accelerated Grand Gulf amortization - amortized and credited through the Unit Power Sales Agreement
3.6 10.7 
System Energy Total$744.9 $665.4 

(a)Offset by related asset.
(b)As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21% effective January 2018, the Vidalia purchased power agreement regulatory liability was reduced by $30.5 million and the Louisiana Act 55 financing savings obligation regulatory liabilities were reduced by $25 million, with corresponding increases to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

Regulatory activity regarding the Tax Cuts and Jobs Act

See the “Other Tax Matters - Tax Cuts and Jobs Act” section in Note 3 to the financial statements for discussion of the effects of the December 2017 enactment of the Tax Cuts and Jobs Act (Tax Act), including its effects on Entergy’s and the Registrant Subsidiaries’ regulatory asset/liability for income taxes.

Entergy Arkansas

Consistent with its previously stated intent to return unprotected excess accumulated deferred income taxes to customers as expeditiously as possible, Entergy Arkansas initiated a tariff proceeding in February 2018 proposing to establish a tax adjustment rider to provide retail customers with certain tax benefits of $467 million associated with the Tax Act. For the residential customer class, unprotected excess accumulated deferred income taxes were returned to customers over a 21-month period from April 2018 through December 2019. For all other customer classes, unprotected excess accumulated deferred income taxes were returned to customers over a nine-month period from April 2018 through December 2018. A true-up provision also was included in the rider, with any over- or under-returned unprotected excess accumulated deferred income taxes credited or billed to customers during the billing month of January 2020, with any residual amounts of over- or under-returned unprotected excess accumulated deferred income taxes to be flowed through Entergy Arkansas’s energy cost recovery rider. In March 2018 the APSC approved the tax adjustment rider effective with the first billing cycle of April 2018.

As discussed below, in July 2018, Entergy Arkansas made its formula rate plan filing to set its formula rate for the 2019 calendar year. A hearing was held in May 2018 regarding the APSC’s inquiries into the effects of the Tax Act, including Entergy Arkansas’s proposal to utilize its formula rate plan rider for its customers to realize the remaining benefits of the Tax Act. Entergy Arkansas’s formula rate plan rider included a netting adjustment that compared actual annual results to the allowed rate of return on common equity. In July 2018 the APSC issued an order agreeing with Entergy Arkansas’s proposal to have the effects of the Tax Act on current income tax expense flow through Entergy Arkansas’s formula rate plan rider and with Entergy Arkansas’s treatment of protected and unprotected excess accumulated deferred income taxes. The APSC also directed Entergy Arkansas to submit in the tax adjustment rider proceeding, discussed above, the adjustments to all other riders affected by the Tax Act and to include an amendment for a true up mechanism where a rider affected by the Tax Act does not already contain a
true-up mechanism. Pursuant to a 2018 settlement agreement in Entergy Arkansas’s formula rate plan proceeding, Entergy Arkansas also removed the net operating loss accumulated deferred income tax asset caused by the Tax Act from Entergy Arkansas’s tax adjustment rider. Entergy Arkansas’s compliance tariff filings were accepted by the APSC in October 2018. In February 2021, pursuant to its 2020 formula rate plan evaluation report settlement, Entergy Arkansas flowed $5.6 million in credits to customers through the tax adjustment rider based on the outcome of certain federal tax positions and a decrease in the state tax rate.

Entergy Louisiana

In an electric formula rate plan settlement approved by the LPSC in April 2018 the parties agreed that Entergy Louisiana would return to customers one-half of its eligible unprotected excess deferred income taxes from May 2018 through December 2018 and return to customers the other half from January 2019 through August 2022. In addition, the settlement provided that in order to flow back to customers certain other tax benefits created by the Tax Act, Entergy Louisiana established a regulatory liability effective January 1, 2018 in the amount of $9.1 million per month to reflect these tax benefits already included in retail rates until new base rates under the formula rate plan were established in September 2018, and this regulatory liability was returned to customers over the September 2018 through August 2019 formula rate plan rate-effective period. The LPSC staff and intervenors in the settlement reserved the right to obtain data from Entergy Louisiana to confirm the determination of excess accumulated deferred income taxes resulting from the Tax Act and the analysis thereof as part of the formula rate plan review proceeding for the 2017 test year filing which, as discussed below, Entergy Louisiana filed in June 2018.

Entergy New Orleans

After enactment of the Tax Act the City Council passed a resolution ordering Entergy New Orleans to, effective January 1, 2018, record deferred regulatory liabilities to account for the Tax Act’s effect on Entergy New Orleans’s revenue requirement and to make a filing by mid-March 2018 regarding the Tax Act’s effects on Entergy New Orleans’s operating income and rate base and potential mechanisms for customers to receive benefits of the Tax Act. The City Council’s resolution also directed Entergy New Orleans to request that Entergy Services file with the FERC for revisions of the Unit Power Sales Agreement and MSS-4 replacement tariffs to address the return of excess accumulated deferred income taxes. Entergy submitted filings of this type to the FERC.

In March 2018, Entergy New Orleans filed its response to the resolution stating that the Tax Act reduced income tax expense from what was then reflected in rates by approximately $8.2 million annually for electric operations and by approximately $1.3 million annually for gas operations. In the filing, Entergy New Orleans proposed to return to customers from June 2018 through August 2019 the benefits of the reduction in income tax expense and its unprotected excess accumulated deferred income taxes through a combination of bill credits and investments in energy efficiency programs, grid modernization, and Smart City projects. Entergy New Orleans submitted supplemental information in April 2018 and May 2018. Shortly thereafter, Entergy New Orleans and the City Council’s advisors reached an agreement in principle that provides for benefits that will be realized by Entergy New Orleans customers through bill credits that started in July 2018 and offsets to future investments in energy efficiency programs, grid modernization, and Smart City projects, as well as additional benefits related to the filings made at the FERC. The agreement in principle was approved by the City Council in June 2018.

Entergy Texas

After enactment of the Tax Act the PUCT issued an order requiring most utilities, including Entergy Texas, beginning January 25, 2018, to record a regulatory liability for the difference between revenues collected under existing rates and revenues that would have been collected had existing rates been set using the new federal income tax rates and also for the balance of excess accumulated deferred income taxes. Entergy Texas had previously provided information to the PUCT staff and stated that it expected the PUCT to address the lower tax expense as part of Entergy Texas’s rate case expected to be filed in May 2018.
In May 2018, Entergy Texas filed its 2018 base rate case with the PUCT. Entergy Texas’s proposed rates and revenues reflected the inclusion of the federal income tax reductions due to the Tax Act. The PUCT issued an order in December 2018 establishing that 1) $25 million be credited to customers through a rider to reflect the lower federal income tax rate applicable to Entergy Texas from January 2018 through the date new rates were implemented, 2) $242.5 million of protected excess accumulated deferred income taxes be returned to customers through base rates under the average rate assumption method over the lives of the associated assets, and 3) $185.2 million of unprotected excess accumulated deferred income taxes be returned to customers through a rider. The unprotected excess accumulated deferred income taxes rider includes carrying charges and is in effect over a period of 12 months for larger customers and over a period of four years for other customers.

System Energy

In a filing made with the FERC in March 2018, System Energy proposed revisions to the Unit Power Sales Agreement to reflect the effects of the Tax Act. In the filing System Energy proposed to return identified quantities of unprotected excess accumulated deferred income taxes to its customers by the end of 2018. In May 2018 the FERC accepted System Energy’s proposed tax revisions with an effective date of June 1, 2018, subject to refund and the outcome of settlement and hearing procedures. Settlement discussions were terminated in April 2019, and a hearing was held in March 2020. The retail regulators of the Utility operating companies that are parties to the Unit Power Sales Agreement challenged the treatment and amount of excess accumulated deferred income tax liabilities associated with uncertain tax positions related to nuclear decommissioning. In July 2020 the presiding ALJ in the proceeding issued an initial decision finding that there is an additional $147 million in unprotected excess accumulated deferred income taxes related to System Energy’s uncertain decommissioning tax deduction. The initial decision determined that System Energy should have included the $147 million in its March 2018 filing. System Energy had not included credits related to the effect of the Tax Act on the uncertain decommissioning tax position because it was uncertain whether the IRS would allow the deduction. The initial decision rejected both System Energy’s alternative argument that any crediting should occur over a ten-year period and the retail regulators’ argument that any crediting should occur over a two-year period. Instead, the initial decision concluded that System Energy should credit the additional unprotected excess accumulated deferred income taxes in a single lump sum revenue requirement reduction following a FERC order addressing the initial decision.

The ALJ initial decision is an interim step in the FERC litigation process. In September 2020, System Energy filed a brief on exceptions with the FERC, re-urging its positions and requesting the reversal of the ALJ’s initial decision. In December 2020, the LPSC, APSC, MPSC, City Council, and FERC trial staff filed briefs opposing exceptions. The FERC will review the case and issue an order in the proceeding, and the FERC may accept, reject, or modify the ALJ’s initial decision in whole or in part. Credits, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.

As discussed below in Grand Gulf Sale-leaseback Renewal Complaint and Uncertain Tax Position Rate Base Issue,” in September 2020 the IRS issued a Notice of Proposed Adjustment (NOPA) and Entergy executed it. In September 2020, System Energy filed a motion to lodge the NOPA into the record in the FERC proceeding. In October 2020 the LPSC, APSC, MPSC, City Council, and FERC trial staff filed oppositions to System Energy’s motion. As a result of the NOPA, System Energy filed, in October 2020, a new Federal Power Act section 205 filing at the FERC to credit the excess accumulated deferred income taxes resulting from the decommissioning uncertain tax position. System Energy proposes to credit the entire amount of the excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position by issuing a one-time credit of $17.8 million. In November 2020, the LPSC, APSC, MPSC, and City Council filed a protest to the filing, and System Energy responded.

In November 2020 the IRS issued the Revenue Agent’s Report (RAR) for the 2014-2015 tax years and in December 2020 Entergy executed it. In December 2020, System Energy filed a motion to lodge the RAR into the record in the FERC proceeding addressing the Tax Cuts and Jobs Act. In January 2021 the LPSC, APSC, MPSC,
and City Council filed a joint answer opposing System Energy’s motion, and the FERC trial staff also filed an answer opposing System Energy’s motion.

As a result of the RAR, in December 2020, System Energy also filed an amendment to its Federal Power Act section 205 filing to credit excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position. The amendment proposed the inclusion of the RAR as support for the filing. In December 2020, the LPSC, APSC, and City Council filed a protest in response to the amendment, reiterating objections to the filing to credit excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position. In February 2021 the FERC issued an order accepting System Energy’s Federal Power Act section 205 filing subject to refund, setting it for hearing, and holding the hearing in abeyance.

In November 2020, System Energy filed a motion to vacate the ALJ’s decision, arguing that it had been overtaken by changed circumstances because of the IRS’s determination resulting from the NOPA and RAR. In January 2021 the LPSC, APSC, MPSC, and City Council filed a joint answer opposing System Energy’s motion, and the FERC trial staff also filed an answer opposing System Energy’s motion. Additional responsive pleadings were filed in February and March 2021. There is no formal deadline for FERC to rule on the motion.

Fuel and purchased power cost recovery

The Utility operating companies are allowed to recover fuel and purchased power costs through fuel mechanisms included in electric and gas rates that are recorded as fuel cost recovery revenues.  The difference between revenues collected and the current fuel and purchased power costs is generally recorded as “Deferred fuel costs” on the Utility operating companies’ financial statements.  The table below shows the amount of deferred fuel costs as of December 31, 2021 and 2020 that Entergy expects to recover (or return to customers) through fuel mechanisms, subject to subsequent regulatory review.

 20212020
 (In Millions)
Entergy Arkansas (a)$177.6 $15.2 
Entergy Louisiana (b)$213.5 $170.4 
Entergy Mississippi$121.9 ($14.7)
Entergy New Orleans (b)($3.5)$6.2 
Entergy Texas$48.3 ($85.4)

(a)Includes $68.8 million in 2021 and $68.2 million in 2020 of fuel and purchased power costs whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.
(b)Includes $168.1 million in both years for Entergy Louisiana and $4.1 million in both years for Entergy New Orleans of fuel, purchased power, and capacity costs, which do not currently earn a return on investment and whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.

Entergy Arkansas

Energy Cost Recovery Rider

Entergy Arkansas’s retail rates include an energy cost recovery rider to recover fuel and purchased energy costs in monthly customer bills.  The rider utilizes the prior calendar-year energy costs and projected energy sales for the twelve-month period commencing on April 1 of each year to develop an energy cost rate, which is redetermined annually and includes a true-up adjustment reflecting the over- or under-recovery, including carrying
charges, of the energy costs for the prior calendar year.  The energy cost recovery rider tariff also allows an interim rate request depending upon the level of over- or under-recovery of fuel and purchased energy costs.

In January 2014, Entergy Arkansas filed a motion with the APSC relating to its upcoming energy cost rate redetermination filing that was made in March 2014. In that motion, Entergy Arkansas requested that the APSC authorize Entergy Arkansas to exclude from the redetermination of its 2014 energy cost rate $65.9 million of incremental fuel and replacement energy costs incurred in 2013 as a result of the ANO stator incident. Entergy Arkansas requested that the APSC authorize Entergy Arkansas to retain that amount in its deferred fuel balance, with recovery to be reviewed in a later period after more information was available regarding various claims associated with the ANO stator incident. In February 2014 the APSC approved Entergy Arkansas’s request to retain that amount in its deferred fuel balance. In July 2017, Entergy Arkansas filed for a change in rates pursuant to its formula rate plan rider. In that proceeding, the APSC approved a settlement agreement agreed upon by the parties, including a provision that requires Entergy Arkansas to initiate a regulatory proceeding for the purpose of recovering funds currently withheld from rates and related to the stator incident, including the $65.9 million of deferred fuel and purchased energy costs previously noted, subject to certain timelines and conditions set forth in the settlement agreement. In October 2021 the APSC approved Entergy Arkansas’s second request to extend the deadline for initiating a regulatory proceeding for the purpose of recovering funds related to the stator incident for twelve additional months, or until December 1, 2022. See the “ANO Damage, Outage, and NRC Reviews” section in Note 8 to the financial statements for further discussion of the ANO stator incident.

In March 2017, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01164 per kWh to $0.01547 per kWh. The APSC staff filed testimony in March 2017 recommending that the redetermined rate be implemented with the first billing cycle of April 2017 under the normal operation of the tariff. Accordingly, the redetermined rate went into effect on March 31, 2017 pursuant to the tariff. In July 2017 the Arkansas Attorney General requested additional information to support certain of the costs included in Entergy Arkansas’s 2017 energy cost rate redetermination.

In March 2018, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01547 per kWh to $0.01882 per kWh. The Arkansas Attorney General filed a response to Entergy Arkansas’s annual redetermination filing requesting that the APSC suspend the proposed tariff to investigate the amount of the redetermination or, alternatively, to allow recovery subject to refund. Among the reasons the Attorney General cited for suspension were questions pertaining to how Entergy Arkansas forecasted sales and potential implications of the Tax Cuts and Jobs Act. Entergy Arkansas replied to the Attorney General’s filing and stated that, to the extent there are questions pertaining to its load forecasting or the operation of the energy cost recovery rider, those issues exceed the scope of the instant rate redetermination. Entergy Arkansas also stated that potential effects of the Tax Cuts and Jobs Act are appropriately considered in the APSC’s separate proceeding regarding potential implications of the tax law. The APSC general staff filed a reply to the Attorney General’s filing and agreed that Entergy Arkansas’s filing complied with the terms of the energy cost recovery rider. The redetermined rate became effective with the first billing cycle of April 2018. Subsequently in April 2018 the APSC issued an order declining to suspend Entergy Arkansas’s energy cost recovery rider rate and declining to require further investigation at that time of the issues suggested by the Attorney General in the proceeding. Following a period of discovery, the Attorney General filed a supplemental response in October 2018 raising new issues with Entergy Arkansas’s March 2018 rate redetermination and asserting that $45.7 million of the increase should be collected subject to refund pending further investigation. Entergy Arkansas filed to dismiss the Attorney General’s supplemental response, the APSC general staff filed a motion to strike the Attorney General’s filing, and the Attorney General filed a supplemental response disputing Entergy Arkansas and the APSC staff’s filing. Applicable APSC rules and processes authorize its general staff to initiate periodic audits of Entergy Arkansas’s energy cost recovery rider. In late-2018 the APSC general staff notified Entergy Arkansas it has initiated an audit of the 2017 fuel costs. The time in which the audit will be complete is uncertain at this time.
In March 2019, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected a decrease from $0.01882 per kWh to $0.01462 per kWh and became effective with the first billing cycle in April 2019. In March 2019 the Arkansas Attorney General filed a response to Entergy Arkansas’s annual adjustment and included with its filing a motion for investigation of alleged overcharges to customers in connection with the FERC’s October 2018 order in the opportunity sales proceeding. Entergy Arkansas filed its response to the Attorney General’s motion in April 2019 in which Entergy Arkansas stated its intent to initiate a proceeding to address recovery issues related to the October 2018 FERC order. In May 2019, Entergy Arkansas initiated the opportunity sales recovery proceeding, discussed below, and requested that the APSC establish that proceeding as the single designated proceeding in which interested parties may assert claims related to the appropriate retail rate treatment of the FERC October 2018 order and related FERC orders in the opportunity sales proceeding. In June 2019 the APSC granted Entergy Arkansas’s request and also denied the Attorney General’s motion in the energy cost recovery proceeding seeking an investigation into Entergy Arkansas’s annual energy cost recovery rider adjustment and referred the evaluation of such matters to the opportunity sales recovery proceeding.

In March 2020, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected a decrease from $0.01462 per kWh to $0.01052 per kWh. The redetermined rate became effective with the first billing cycle in April 2020 through the normal operation of the tariff.

In March 2021, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected a decrease from $0.01052 per kWh to $0.00959 per kWh. The redetermined rate calculation also included an adjustment to account for a portion of the increased fuel costs resulting from the February 2021 winter storms. The redetermined rate became effective with the first billing cycle in April 2021 through the normal operation of the tariff.

Entergy Louisiana

Entergy Louisiana recovers electric fuel and purchased power costs for the billing month based upon the level of such costs incurred two months prior to the billing month. Entergy Louisiana’s purchased gas adjustments include estimates for the billing month adjusted by a surcharge or credit that arises from an annual reconciliation of fuel costs incurred with fuel cost revenues billed to customers, including carrying charges.

In July 2014 the LPSC authorized its staff to initiate an audit of the fuel adjustment clause filings by Entergy Gulf States Louisiana, whose business was combined with Entergy Louisiana in 2015. The audit includes a review of the reasonableness of charges flowed through Entergy Gulf States Louisiana’s fuel adjustment clause for the period from 2010 through 2013. In January 2019 the LPSC staff consultant issued its audit report. In its report, the LPSC staff consultant recommended that Entergy Louisiana refund approximately $900,000, plus interest, to customers based upon the imputation of a claim of vendor fault in servicing its nuclear plant. Entergy Louisiana recorded a provision in the first quarter 2019 for the potential outcome of the audit. In August 2019, Entergy Louisiana filed direct testimony challenging the basis for the LPSC staff’s recommended disallowance and providing an alternative calculation of replacement power costs should it be determined that a disallowance is appropriate. Entergy Louisiana’s calculation would require no refund to customers.

In July 2014 the LPSC authorized its staff to initiate an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed by Entergy Louisiana through its fuel adjustment clause for the period from 2010 through 2013. In January 2019 the LPSC staff issued its audit report recommending that Entergy Louisiana refund approximately $7.3 million, plus interest, to customers based upon the imputation of a claim of vendor fault in servicing its nuclear plant. Entergy Louisiana recorded a provision in the first quarter 2019 for the potential outcome of the audit. In August 2019, Entergy Louisiana filed direct testimony challenging the basis for the LPSC staff’s recommended disallowance and providing an alternative calculation of replacement power costs should it be determined that a disallowance is appropriate. Entergy Louisiana’s calculation
would require a refund to customers of approximately $4.3 million, plus interest, as compared to the LPSC staff’s recommendation of $7.3 million, plus interest. Responsive testimony was filed by the LPSC staff and intervenors in September 2019; all parties either agreed with or did not oppose Entergy Louisiana’s alternative calculation of replacement power costs.

In November 2019 the pending LPSC proceedings for the 2010-2013 Entergy Louisiana and Entergy Gulf States Louisiana audits were consolidated to facilitate a settlement of both fuel audits. In December 2019 an unopposed settlement was reached that requires a refund to legacy Entergy Louisiana customers of approximately $2.3 million, including interest, and no refund to legacy Entergy Gulf States Louisiana customers. The LPSC approved the settlement in January 2020. A one-time refund was made in February 2020.

In March 2020 the LPSC staff provided notice of an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s fuel adjustment clause for the period from 2016 through 2019. In September 2021 the LPSC submitted its audit report and found that all costs recovered through the fuel adjustment clause were reasonable and eligible for recovery through the fuel adjustment clause. Intervenors are conducting discovery regarding the LPSC staff’s report.

In February 2021, Entergy Louisiana incurred extraordinary fuel costs associated with the February 2021 winter storms. To mitigate the effect of these costs on customer bills, in March 2021 Entergy Louisiana requested and the LPSC approved the deferral and recovery of $166 million in incremental fuel costs over five months beginning in April 2021. The incremental fuel costs remain subject to review for reasonableness and eligibility for recovery through the fuel adjustment clause mechanism. The final amount of incremental fuel costs is subject to change through the resettlement process. At its April 2021 meeting, the LPSC authorized its staff to review the prudence of the February 2021 fuel costs incurred by all LPSC-jurisdictional utilities. At its June 2021 meeting, the LPSC approved the hiring of consultants to assist its staff in this review. Discovery is ongoing.

In March 2021 the LPSC staff provided notice of an audit of Entergy Louisiana’s purchased gas adjustment clause filings covering the period January 2018 through December 2020. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s purchased gas adjustment clause for that period. Discovery is ongoing, and no audit report has been filed.

Entergy Mississippi

Entergy Mississippi’s rate schedules include an energy cost recovery rider that is adjusted annually to reflect accumulated over- or under-recoveries.  Entergy Mississippi’s fuel cost recoveries are subject to annual audits conducted pursuant to the authority of the MPSC.

In November 2018, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an under-recovery of approximately $57 million as of September 30, 2018. In January 2019 the MPSC approved the proposed energy cost factor effective for February 2019 bills.

In November 2019, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation included $39.6 million of prior over-recovery flowing back to customers beginning February 2020. Entergy Mississippi’s balance in its deferred fuel account did not decrease as expected after implementation of the new factor. In an effort to assist customers during the COVID-19 pandemic, in May 2020, Entergy Mississippi requested an interim adjustment to the energy cost recovery rider to credit approximately $50 million from the over-recovered balance in the deferred fuel account to customers over four consecutive billing months. The MPSC approved this interim adjustment in May 2020 effective for June through September 2020 bills.
In November 2020, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an over-recovery of approximately $24.4 million as of September 30, 2020. In January 2021 the MPSC approved the proposed energy cost factor effective for February 2021 bills.

In November 2021, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an under-recovery of approximately $80.6 million as of September 30, 2021. In December 2021, at the request of the MPSC, Entergy Mississippi submitted a proposal to mitigate the impact of rising fuel costs on customer bills during 2022. Entergy Mississippi proposed that the deferred fuel balance as of December 31, 2021, which was $121.9 million, be amortized over three years, and that the MPSC authorize Entergy Mississippi to apply its weighted-average cost of capital as the carrying cost for the unamortized fuel balance. In January 2022 the MPSC approved the amortization of $100 million of the deferred fuel balance over two years and authorized Entergy Mississippi to apply its weighted-average cost of capital as the carrying cost for the unamortized fuel balance. The MPSC approved the proposed energy cost factor effective for February 2022 bills.

Entergy New Orleans

Entergy New Orleans’s electric rate schedules include a fuel adjustment tariff designed to reflect no more than targeted fuel and purchased power costs, adjusted by a surcharge or credit for deferred fuel expense arising from the monthly reconciliation of actual fuel and purchased power costs incurred with fuel cost revenues billed to customers, including carrying charges.

Entergy New Orleans’s gas rate schedules include a purchased gas adjustment to reflect estimated gas costs for the billing month, adjusted by a surcharge or credit similar to that included in the electric fuel adjustment clause, including carrying charges.

Entergy Texas

Entergy Texas’s rate schedules include a fixed fuel factor to recover fuel and purchased power costs, including interest, not recovered in base rates.  Semi-annual revisions of the fixed fuel factor are made in March and September based on the market price of natural gas and changes in fuel mix.  The amounts collected under Entergy Texas’s fixed fuel factor and any interim surcharge or refund are subject to fuel reconciliation proceedings before the PUCT. A fuel reconciliation is required to be filed at least once every three years and outside of a base rate case filing.

In September 2019, Entergy Texas filed an application to reconcile its fuel and purchased power costs for the period from April 2016 through March 2019. During the reconciliation period, Entergy Texas incurred approximately $1.6 billion in Texas jurisdictional eligible fuel and purchased power expenses, net of certain revenues credited to such expenses and other adjustments. Entergy Texas estimated an under-recovery balance of approximately $25.8 million, including interest, which Entergy Texas requested authority to carry over as the beginning balance for the subsequent reconciliation period beginning April 2019. In March 2020 an intervenor filed testimony proposing that the PUCT disallow: (1) $2 million in replacement power costs associated with generation outages during the reconciliation period; and (2) $24.4 million associated with the operation of the Spindletop natural gas storage facility during the reconciliation period.  In April 2020, Entergy Texas filed rebuttal testimony refuting all points raised by the intervenor.  In June 2020 the parties filed a stipulation and settlement agreement, which included a $1.2 million disallowance not associated with any particular issue raised by any party. The PUCT approved the settlement in August 2020.

In July 2020, Entergy Texas filed an application with the PUCT to implement an interim fuel refund of $25.5 million, including interest. Entergy Texas proposed that the interim fuel refund be implemented beginning with the first August 2020 billing cycle over a three-month period for smaller customers and in a lump sum amount
in the billing month of August 2020 for transmission-level customers. The interim fuel refund was approved in July 2020, and Entergy Texas began refunds in August 2020.

In February 2021, Entergy Texas filed an application to implement a fuel refund for a cumulative over-recovery of approximately $75 million that is primarily attributable to settlements received by Entergy Texas from MISO related to Hurricane Laura. Entergy Texas planned to issue the refund over the period of March through August 2021. On February 22, 2021, Entergy Texas filed a motion to abate its fuel refund proceeding to assess how the February 2021 winter storm impacted Entergy Texas’s fuel over-recovery position. In March 2021, Entergy Texas withdrew its application to implement the fuel refund. Entergy Texas is continuing to evaluate its fuel balance and will file a subsequent refund or surcharge application consistent with the requirements of the PUCT’s rules.
Entergy Arkansas Opportunity Sales Proceeding

In June 2009 the LPSC filed a complaint requesting that the FERC determine that certain of Entergy Arkansas’s sales of electric energy to third parties: (a) violated the provisions of the System Agreement that allocated the energy generated by Entergy System resources; (b) imprudently denied the Entergy System and its ultimate consumers the benefits of low-cost Entergy System generating capacity; and (c) violated the provision of the System Agreement that prohibited sales to third parties by individual companies absent an offer of a right-of-first-refusal to other Utility operating companies.  The LPSC’s complaint challenged sales made beginning in 2002 and requested refunds.  In July 2009 the Utility operating companies filed a response to the complaint arguing among other things that the System Agreement contemplates that the Utility operating companies may make sales to third parties for their own account, subject to the requirement that those sales be included in the load (or load shape) for the applicable Utility operating company.  The FERC subsequently ordered a hearing in the proceeding.

After a hearing, the ALJ issued an initial decision in December 2010.  The ALJ found that the System Agreement allowed for Entergy Arkansas to make the sales to third parties but concluded that the sales should be accounted for in the same manner as joint account sales.  The ALJ concluded that “shareholders” should make refunds of the damages to the Utility operating companies, along with interest.  Entergy disagreed with several aspects of the ALJ’s initial decision and in January 2011 filed with the FERC exceptions to the decision.
The FERC issued a decision in June 2012 and held that, while the System Agreement is ambiguous, it does provide authority for individual Utility operating companies to make opportunity sales for their own account and Entergy Arkansas made and priced these sales in good faith.  The FERC found, however, that the System Agreement does not provide authority for an individual Utility operating company to allocate the energy associated with such opportunity sales as part of its load but provides a different allocation authority.  The FERC further found that the after-the-fact accounting methodology used to allocate the energy used to supply the sales was inconsistent with the System Agreement.  The FERC in its decision established further hearing procedures to quantify the effect of repricing the opportunity sales in accordance with the FERC’s June 2012 decision. The hearing was held in May 2013 and the ALJ issued an initial decision in August 2013. The LPSC, the APSC, the City Council, and FERC staff filed briefs on exceptions and/or briefs opposing exceptions. Entergy filed a brief on exceptions requesting that the FERC reverse the initial decision and a brief opposing certain exceptions taken by the LPSC and FERC staff.

In April 2016 the FERC issued orders addressing requests for rehearing filed in July 2012 and the ALJ’s August 2013 initial decision. The first order denied Entergy’s request for rehearing and affirmed the FERC’s earlier rulings that Entergy’s original methodology for allocating energy costs to the opportunity sales was incorrect and, as a result, Entergy Arkansas must make payments to the other Utility operating companies to put them in the same position that they would have been in absent the incorrect allocation. The FERC clarified that interest should be included with the payments. The second order affirmed in part, and reversed in part, the rulings in the ALJ’s August 2013 initial decision regarding the methodology that should be used to calculate the payments Entergy Arkansas is to make to the other Utility operating companies. The FERC affirmed the ALJ’s ruling that a full re-run of intra-system bills should be performed but required that methodology be modified so that the sales have the same priority for purposes of energy allocation as joint account sales. The FERC reversed the ALJ’s decision that any payments by Entergy Arkansas should be reduced by 20%. The FERC also reversed the ALJ’s decision that adjustments to other System Agreement service schedules and excess bandwidth payments should not be taken into account when calculating the payments to be made by Entergy Arkansas. The FERC held that such adjustments and excess bandwidth payments should be taken into account but ordered further proceedings before an ALJ to address whether a cap on any reduction due to bandwidth payments was necessary and to implement the other adjustments to the calculation methodology.

In May 2016, Entergy Services filed a request for rehearing of the FERC’s April 2016 order arguing that payments made by Entergy Arkansas should be reduced as a result of the timing of the LPSC’s approval of certain contracts. Entergy Services also filed a request for clarification and/or rehearing of the FERC’s April 2016 order addressing the ALJ’s August 2013 initial decision. The APSC and the LPSC also filed requests for rehearing of the FERC’s April 2016 order. In September 2017 the FERC issued an order denying the request for rehearing on the issue of whether any payments by Entergy Arkansas to the other Utility operating companies should be reduced due to the timing of the LPSC’s approval of Entergy Arkansas’s wholesale baseload contract with Entergy Louisiana. In November 2017 the FERC issued an order denying all of the remaining requests for rehearing of the April 2016 order. In November 2017, Entergy Services filed a petition for review in the D.C. Circuit of the FERC’s orders in the first two phases of the opportunity sales case. In December 2017 the D.C. Circuit granted Entergy Services’ request to hold the appeal in abeyance pending final resolution of the related proceeding before the FERC. In January 2018 the APSC and the LPSC filed separate petitions for review in the D.C. Circuit, and the D.C. Circuit consolidated the appeals with Entergy Services’ appeal.

The hearing required by the FERC’s April 2016 order was held in May 2017. In July 2017 the ALJ issued an initial decision addressing whether a cap on any reduction due to bandwidth payments was necessary and whether to implement the other adjustments to the calculation methodology. In August 2017 the Utility operating companies, the LPSC, the APSC, and FERC staff filed individual briefs on exceptions challenging various aspects of the initial decision. In September 2017 the Utility operating companies, the LPSC, the APSC, the MPSC, the City Council, and FERC staff filed separate briefs opposing exceptions taken by various parties.
Based on testimony previously submitted in the case and its assessment of the April 2016 FERC orders, in the first quarter 2016, Entergy Arkansas recorded a liability of $87 million, which included interest, for its estimated increased costs and payment to the other Utility operating companies, and a deferred fuel regulatory asset of $75 million. Following its assessment of the course of the proceedings, including the FERC’s denial of rehearing in November 2017 described above, in the fourth quarter 2017, Entergy Arkansas recorded an additional liability of $35 million and a regulatory asset of $31 million.

In October 2018 the FERC issued an order addressing the ALJ’s July 2017 initial decision. The FERC reversed the ALJ’s decision to cap the reduction in Entergy Arkansas’s payment to account for the increased bandwidth payments that Entergy Arkansas made to the other operating companies. The FERC also reversed the ALJ’s decision that Grand Gulf sales from January through September 2000 should be included in the calculation of Entergy Arkansas’s payment. The FERC affirmed on other grounds the ALJ’s rejection of the LPSC’s claim that certain joint account sales should be accounted for as part of the calculation of Entergy Arkansas’s payment. In November 2018 the LPSC requested rehearing of the FERC’s October 2018 decision. In December 2019 the FERC denied the LPSC’s request for rehearing. In January 2020 the LPSC appealed the December 2019 decision to the D.C. Circuit.

In December 2018, Entergy made a compliance filing in response to the FERC’s October 2018 order. The compliance filing provided a final calculation of Entergy Arkansas’s payments to the other Utility operating companies, including interest. No protests were filed in response to the December 2018 compliance filing. The December 2018 compliance filing is pending FERC action. Refunds and interest in the following amounts were paid by Entergy Arkansas to the other operating companies in December 2018:

 Total refunds including interest
Payment/(Receipt)
 (In Millions)
PrincipalInterestTotal
Entergy Arkansas$68$67$135
Entergy Louisiana($30)($29)($59)
Entergy Mississippi($18)($18)($36)
Entergy New Orleans($3)($4)($7)
Entergy Texas($17)($16)($33)

Entergy Arkansas previously recognized a regulatory asset with a balance of $116 million as of December 31, 2018 for a portion of the payments due as a result of this proceeding.

As described above, the FERC’s opportunity sales orders have been appealed to the D.C. Circuit. In February 2020 all of the appeals were consolidated and in April 2020 the D.C. Circuit established a briefing schedule. Briefing was completed in September 2020 and oral argument was heard in December 2020. In July 2021 the D.C. Circuit issued a decision denying all of the petitions for review filed in response to the FERC’s opportunity sales orders.

In February 2019 the LPSC filed a new complaint relating to two issues that were raised in the opportunity sales proceeding, but that, in its October 2018 order, the FERC held were outside the scope of the proceeding. In March 2019, Entergy Services filed an answer and motion to dismiss the new complaint. In November 2019 the FERC issued an order denying the LPSC’s complaint. The order concluded that the settlement agreement approved by the FERC in December 2015 terminating the System Agreement barred the LPSC’s new complaint. In December 2019 the LPSC requested rehearing of the FERC’s November 2019 order, and in July 2020 the FERC issued an order dismissing the LPSC’s request for rehearing. In September 2020 the LPSC appealed to the D.C. Circuit the FERC’s orders dismissing the new opportunity sales complaint. In November 2020 the D.C. Circuit
issued an order establishing that briefing will occur in January 2021 through April 2021. Oral argument was held in September 2021. In December 2021 the D.C. Circuit denied the LPSC’s Petition for Review of the new opportunity sales complaint. The opportunity sales cases are complete at FERC and at the D.C. Circuit and no additional refund amounts are owed by Entergy Arkansas.

In May 2019, Entergy Arkansas filed an application and supporting testimony with the APSC requesting approval of a special rider tariff to recover the costs of these payments from its retail customers over a 24-month period.  The application requested that the APSC approve the rider to take effect within 30 days or, if suspended by the APSC as allowed by commission rule, approve the rider to take effect in the first billing cycle of the first month occurring 30 days after issuance of the APSC’s order approving the rider. In June 2019 the APSC suspended Entergy Arkansas’s tariff and granted Entergy Arkansas’s motion asking the APSC to establish the proceeding as the single designated proceeding in which interested parties may assert claims related to the appropriate retail rate treatment of the FERC’s October 2018 order and related FERC orders in the opportunity sales proceeding. In January 2020 the APSC adopted a procedural schedule with a hearing in April 2020. In January 2020 the Attorney General and Arkansas Electric Energy Consumers, Inc. filed a joint motion seeking to dismiss Entergy Arkansas’s application alleging that the APSC, in a prior proceeding, ruled on the issues addressed in the application and determined that Entergy Arkansas’s requested relief violates the filed rate doctrine and the prohibition against retroactive ratemaking. Entergy Arkansas responded to the joint motion in February 2020 rebutting these arguments, including demonstrating that the claims in this proceeding differ substantially from those the APSC addressed previously and that the payment resulting from a FERC tariff violation for which Entergy Arkansas seeks retail cost recovery in this proceeding differs materially from the refunds resulting from a FERC tariff amendment that the APSC previously rejected on filed rate doctrine and the retroactive ratemaking grounds. In addition, in January 2020 the Attorney General and Arkansas Electric Energy Consumers, Inc. filed testimony opposing the recovery by Entergy Arkansas of the opportunity sales payment but also claiming that certain components of the payment should be segregated and refunded to customers. In March 2020, Entergy Arkansas filed rebuttal testimony.

In July 2020 the APSC issued a decision finding that Entergy Arkansas’s application is not in the public interest. The order also directed Entergy Arkansas to refund to its retail customers within 30 days of the order the FERC-determined over-collection of $13.7 million, plus interest, associated with a recalculated bandwidth remedy. In addition to these primary findings, the order also denied the Attorney General’s request for Entergy Arkansas to prepare a compliance filing detailing all of the retail impacts from the opportunity sales and denied a request by the Arkansas Electric Energy Consumers to recalculate all costs using the revised responsibility ratio. Entergy Arkansas filed a motion for temporary stay of the 30-day requirement to allow Entergy Arkansas a reasonable opportunity to seek rehearing of the APSC order, but in July 2020 the APSC denied Entergy Arkansas’s request for a stay and directed Entergy Arkansas to refund to its retail customers the component of the total FERC-determined opportunity sales payment that was associated with increased bandwidth remedy payments of $13.7 million, plus interest. The refunds were issued in the August 2020 billing cycle. While the APSC denied Entergy Arkansas’s stay request, Entergy Arkansas believes its actions were prudent and, therefore, the costs, including the $13.7 million, plus interest, are recoverable. In July 2020, Entergy Arkansas requested rehearing of the APSC order, which rehearing was denied by the APSC in August 2020. In September 2020, Entergy Arkansas filed a complaint in the U.S. District Court for the Eastern District of Arkansas challenging the APSC’s order denying Entergy Arkansas’s request to recover the costs of these payments. In October 2020 the APSC filed a motion to dismiss Entergy Arkansas’s complaint, to which Entergy Arkansas responded. Also in December 2020, Entergy Arkansas and the APSC held a pre-trial conference, and filed a report with the court in January 2021. The court held a hearing in February 2021 regarding issues addressed in the pre-trial conference report, and in June 2021 the court stayed all discovery until it rules on pending motions, after which the court will issue an amended schedule if necessary.
Complaints Against System Energy

System Energy’s operating revenues are derived from the allocation of the capacity, energy, and related costs associated with its 90% ownership/leasehold interest in Grand Gulf.  System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans pursuant to the Unit Power Sales Agreement. System Energy and the Unit Power Sales Agreement are currently the subject of several litigation proceedings at the FERC, including challenges with respect to System Energy’s authorized return on equity and capital structure, renewal of its sale-leaseback arrangement, treatment of uncertain tax positions, a broader investigation of rates under the Unit Power Sales Agreement, and a prudence complaint challenging the extended power uprate completed at Grand Gulf in 2012 and the operation and management of Grand Gulf, particularly in the 2016-2020 time period. The claims in these proceedings include claims for refunds and claims for rate adjustments; the aggregate amount of refunds claimed in these proceedings substantially exceeds the net book value of System Energy. Following are discussions of the proceedings.

Return on Equity and Capital Structure Complaints

In January 2017 the APSC and MPSC filed a complaint with the FERC against System Energy. The complaint seeks a reduction in the return on equity component of the Unit Power Sales Agreement pursuant to which System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. Entergy Arkansas also sells some of its Grand Gulf capacity and energy to Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under separate agreements. The current return on equity under the Unit Power Sales Agreement is 10.94%, which was established in a rate proceeding that became final in July 2001.

The APSC and MPSC complaint alleges that the return on equity is unjust and unreasonable because capital market and other considerations indicate that it is excessive. The complaint requests proceedings to investigate the return on equity and establish a lower return on equity, and also requests that the FERC establish January 23, 2017 as a refund effective date. The complaint includes return on equity analysis that purports to establish that the range of reasonable return on equity for System Energy is between 8.37% and 8.67%. System Energy answered the complaint in February 2017 and disputes that a return on equity of 8.37% to 8.67% is just and reasonable. The LPSC and the City Council intervened in the proceeding expressing support for the complaint. In September 2017 the FERC established a refund effective date of January 23, 2017 and directed the parties to engage in settlement proceedings before an ALJ. The parties were unable to settle the return on equity issue and a FERC hearing judge was assigned in July 2018. The 15-month refund period in connection with the APSC/MPSC complaint expired on April 23, 2018.

In April 2018 the LPSC filed a complaint with the FERC against System Energy seeking an additional 15-month refund period.  The LPSC complaint requests similar relief from the FERC with respect to System Energy’s return on equity and also requests the FERC to investigate System Energy’s capital structure.  The APSC, MPSC, and City Council intervened in the proceeding, filed an answer expressing support for the complaint, and asked the FERC to consolidate this proceeding with the proceeding initiated by the complaint of the APSC and MPSC in January 2017. System Energy answered the LPSC complaint in May 2018 and also filed a motion to dismiss the complaint. In August 2018 the FERC issued an order dismissing the LPSC’s request to investigate System Energy’s capital structure and setting for hearing the return on equity complaint, with a refund effective date of April 27, 2018. The 15-month refund period in connection with the LPSC return on equity complaint expired on July 26, 2019.

The portion of the LPSC’s complaint dealing with return on equity was subsequently consolidated with the APSC and MPSC complaint for hearing. The parties addressed an order (issued in a separate FERC proceeding involving New England transmission owners) that proposed modifying the FERC’s standard methodology for determining return on equity. In September 2018, System Energy filed a request for rehearing and the LPSC filed a request for rehearing or reconsideration of the FERC’s August 2018 order. The LPSC’s request referenced an
amended complaint that it filed on the same day raising the same capital structure claim the FERC had earlier dismissed. The FERC initiated a new proceeding for the amended capital structure complaint, and System Energy submitted a response in October 2018. In January 2019 the FERC set the amended complaint for settlement and hearing proceedings. Settlement proceedings in the capital structure proceeding commenced in February 2019. As noted below, in June 2019 settlement discussions were terminated and the amended capital structure complaint was consolidated with the ongoing return on equity proceeding. The 15-month refund period in connection with the capital structure complaint was from September 24, 2018 to December 23, 2019.

In January 2019 the LPSC and the APSC and MPSC filed direct testimony in the return on equity proceeding. For the refund period January 23, 2017 through April 23, 2018, the LPSC argues for an authorized return on equity for System Energy of 7.81% and the APSC and MPSC argue for an authorized return on equity for System Energy of 8.24%. For the refund period April 27, 2018 through July 27, 2019, and for application on a prospective basis, the LPSC argues for an authorized return on equity for System Energy of 7.97% and the APSC and MPSC argue for an authorized return on equity for System Energy of 8.41%. In March 2019, System Energy submitted answering testimony. For the first refund period, System Energy’s testimony argues for a return on equity of 10.10% (median) or 10.70% (midpoint). For the second refund period, System Energy’s testimony shows that the calculated returns on equity for the first period fall within the range of presumptively just and reasonable returns on equity, and thus the second complaint should be dismissed (and the first period return on equity used going forward). If the FERC nonetheless were to set a new return on equity for the second period (and going forward), System Energy argues the return on equity should be either 10.32% (median) or 10.69% (midpoint).

In May 2019 the FERC trial staff filed its direct and answering testimony in the return on equity proceeding. For the first refund period, the FERC trial staff calculates an authorized return on equity for System Energy of 9.89% based on the application of FERC’s proposed methodology. The FERC trial staff’s direct and answering testimony noted that an authorized return on equity of 9.89% for the first refund period was within the range of presumptively just and reasonable returns on equity for the second refund period, as calculated using a study period ending January 31, 2019 for the second refund period.

In June 2019, System Energy filed testimony responding to the testimony filed by the FERC trial staff. Among other things, System Energy’s testimony rebutted arguments raised by the FERC trial staff and provided updated calculations for the second refund period based on the study period ending May 31, 2019. For that refund period, System Energy’s testimony shows that strict application of the return on equity methodology proposed by the FERC staff indicates that the second complaint would not be dismissed, and the new return on equity would be set at 9.65% (median) or 9.74% (midpoint). System Energy’s testimony argues that these results are insufficient in light of benchmarks such as state returns on equity and treasury bond yields, and instead proposes that the calculated returns on equity for the second period should be either 9.91% (median) or 10.3% (midpoint). System Energy’s testimony also argues that, under application of its proposed modified methodology, the 10.10% return on equity calculated for the first refund period would fall within the range of presumptively just and reasonable returns on equity for the second refund period.

Also in June 2019, the FERC’s Chief ALJ issued an order terminating settlement discussions in the amended complaint addressing System Energy’s capital structure. The ALJ consolidated the amended capital structure complaint with the ongoing return on equity proceeding and set new procedural deadlines for the consolidated hearing.

In August 2019 the LPSC and the APSC and MPSC filed rebuttal testimony in the return on equity proceeding and direct and answering testimony relating to System Energy’s capital structure. The LPSC re-argues for an authorized return on equity for System Energy of 7.81% for the first refund period and 7.97% for the second refund period. The APSC and MPSC argue for an authorized return on equity for System Energy of 8.26% for the first refund period and 8.32% for the second refund period. With respect to capital structure, the LPSC proposes that the FERC establish a hypothetical capital structure for System Energy for ratemaking purposes. Specifically, the LPSC proposes that System Energy’s common equity ratio be set to Entergy Corporation’s equity ratio of 37%
equity and 63% debt. In the alternative, the LPSC argues that the equity ratio should be no higher than 49%, the composite equity ratio of System Energy and the other Entergy operating companies who purchase under the Unit Power Sales Agreement. The APSC and MPSC recommend that 35.98% be set as the common equity ratio for System Energy. As an alternative, the APSC and MPSC propose that System Energy’s common equity be set at 46.75% based on the median equity ratio of the proxy group for setting the return on equity.

In September 2019 the FERC trial staff filed its rebuttal testimony in the return on equity proceeding. For the first refund period, the FERC trial staff calculates an authorized return on equity for System Energy of 9.40% based on the application of the FERC’s proposed methodology and an updated proxy group. For the second refund period, based on the study period ending May 31, 2019, the FERC trial staff rebuttal testimony argues for a return on equity of 9.63%. In September 2019 the FERC trial staff also filed direct and answering testimony relating to System Energy’s capital structure. The FERC trial staff argues that the average capital structure of the proxy group used to develop System Energy’s return on equity should be used to establish the capital structure. Using this approach, the FERC trial staff calculates the average capital structure for its proposed proxy group of 46.74% common equity, and 53.26% debt.

In October 2019, System Energy filed answering testimony disputing the FERC trial staff’s, the LPSC’s, and the APSC’s and MPSC’s arguments for the use of a hypothetical capital structure and arguing that the use of System Energy’s actual capital structure is just and reasonable.

In November 2019, in a proceeding that did not involve System Energy, the FERC issued an order addressing the methodology for determining the return on equity applicable to transmission owners in MISO. Thereafter, the procedural schedule in the System Energy proceeding was amended to allow the participants to file supplemental testimony addressing the order in the MISO transmission owner proceeding (Opinion No. 569).

In February 2020 the LPSC, the MPSC and APSC, and the FERC trial staff filed supplemental testimony addressing Opinion No. 569 and how it would affect the return on equity evaluation for the two complaint periods concerning System Energy. For the first refund period, based on their respective interpretations and applications of the Opinion No. 569 methodology, the LPSC argues for an authorized return on equity for System Energy of 8.44%; the MPSC and APSC argue for an authorized return on equity of 8.41%; and the FERC trial staff argues for an authorized return on equity of 9.22%. For the second refund period and on a prospective basis, based on their respective interpretations and applications of the Opinion No. 569 methodology, the LPSC argues for an authorized return on equity for System Energy of 7.89%; the MPSC and APSC argue that an authorized return on equity of 8.01% may be appropriate; and the FERC trial staff argues for an authorized return on equity of 8.66%.

In April 2020, System Energy filed supplemental answering testimony addressing Opinion No. 569. System Energy argues that the Opinion No. 569 methodology is conceptually and analytically defective for purposes of establishing just and reasonable authorized return on equity determinations and proposes an alternative approach. As its primary recommendation, System Energy continues to support the return on equity determinations in its March 2019 testimony for the first refund period and its June 2019 testimony for the second refund period. Under the Opinion No. 569 methodology, System Energy calculates a “presumptively just and reasonable range” for the authorized return on equity for the first refund period of 8.57% to 9.52%, and for the second refund period of 8.28% to 9.11%. System Energy argues that these ranges are not just and reasonable results. Under its proposed alternative methodology, System Energy calculates an authorized return on equity of 10.26% for the first refund period, which also falls within the presumptively just and reasonable range calculated for the second refund period and prospectively.

In May 2020 the FERC issued an order on rehearing of Opinion No. 569 (Opinion No. 569-A). In June 2020 the procedural schedule in the System Energy proceeding was further revised in order to allow parties to address the Opinion No. 569-A methodology. Pursuant to the revised schedule, in June 2020, the LPSC, MPSC and APSC, and the FERC trial staff filed supplemental testimony addressing Opinion No. 569-A and how it would affect the return on equity evaluation for the two complaint periods concerning System Energy. For the first refund
period, based on their respective interpretations and applications of the Opinion No. 569-A methodology, the LPSC argues for an authorized return on equity for System Energy of 7.97%; the MPSC and APSC argue for an authorized return on equity of 9.24%; and the FERC trial staff argues for an authorized return on equity of 9.49%. For the second refund period and on a prospective basis, based on their respective interpretations and applications of the Opinion No. 569-A methodology, the LPSC argues for an authorized return on equity for System Energy of 7.78%; the MPSC and APSC argue that an authorized return on equity of 9.15% may be appropriate if the second complaint is not dismissed; and the FERC trial staff argues for an authorized return on equity of 9.09% if the second complaint is not dismissed.

Pursuant to the revised procedural schedule, in July 2020, System Energy filed supplemental testimony addressing Opinion No. 569-A. System Energy argues that strict application of the Opinion No. 569-A methodology produces results inconsistent with investor requirements and does not provide a sound basis on which to evaluate System Energy’s authorized return on equity. As its primary recommendation, System Energy argues for the use of a methodology that incorporates four separate financial models, including the constant growth form of the discounted cash flow model and the empirical capital asset pricing model. Based on application of its recommended methodology, System Energy argues for an authorized return on equity of 10.12% for the first refund period, which also falls within the presumptively just and reasonable range calculated for the second refund period and prospectively. Under the Opinion No. 569-A methodology, System Energy calculates an authorized return on equity of 9.44% for the first refund period, which also falls within the presumptively just and reasonable range calculated for the second refund period and prospectively.

The parties and FERC trial staff filed final rounds of testimony in August 2020. The hearing before a FERC ALJ occurred in late-September through early-October 2020, post-hearing briefing took place in November and December 2020.

In March 2021 the FERC ALJ issued an initial decision. With regard to System Energy’s authorized return on equity, the ALJ determined that the existing return on equity of 10.94% is no longer just and reasonable, and that the replacement authorized return on equity, based on application of the Opinion No. 569-A methodology, should be 9.32%. The ALJ further determined that System Energy should pay refunds for a fifteen-month refund period (January 2017-April 2018) based on the difference between the current return on equity and the replacement authorized return on equity. The ALJ determined that the April 2018 complaint concerning the authorized return on equity should be dismissed, and that no refunds for a second fifteen-month refund period should be due. With regard to System Energy’s capital structure, the ALJ determined that System Energy’s actual equity ratio is excessive and that the just and reasonable equity ratio is 48.15% equity, based on the average equity ratio of the proxy group used to evaluate the return on equity for the second complaint. The ALJ further determined that System Energy should pay refunds for a fifteen-month refund period (September 2018-December 2019) based on the difference between the actual equity ratio and the 48.15% equity ratio. If the ALJ’s initial decision is upheld, the estimated refund for this proceeding is approximately $60 million, which includes interest through December 31, 2021, and the estimated resulting annual rate reduction would be approximately $45 million. The estimated refund will continue to accrue interest until a final FERC decision is issued. Based on the course of the proceeding to date, System Energy has recorded a provision of $37 million, including interest, as of December 31, 2021.

The ALJ initial decision is an interim step in the FERC litigation process, and an ALJ’s determinations made in an initial decision are not controlling on the FERC. In April 2021, System Energy filed its brief on exceptions, in which it challenged the initial decision’s findings on both the return on equity and capital structure issues. Also in April 2021 the LPSC, APSC, MPSC, City Council, and the FERC trial staff filed briefs on exceptions. Reply briefs opposing exceptions were filed in May 2021 by System Energy, the FERC trial staff, the LPSC, APSC, MPSC, and the City Council. Refunds, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.
Grand Gulf Sale-leaseback Renewal Complaint and Uncertain Tax Position Rate Base Issue

In May 2018 the LPSC filed a complaint against System Energy and Entergy Services related to System Energy’s renewal of a sale-leaseback transaction originally entered into in December 1988 for an 11.5% undivided interest in Grand Gulf Unit 1. The complaint alleges that System Energy violated the filed rate and the FERC’s ratemaking and accounting requirements when it included in Unit Power Sales Agreement billings the cost of capital additions associated with the sale-leaseback interest, and that System Energy is double-recovering costs by including both the lease payments and the capital additions in Unit Power Sales Agreement billings. The complaint also claims that System Energy was imprudent in entering into the sale-leaseback renewal because the Utility operating companies that purchase Grand Gulf’s output from System Energy could have obtained cheaper capacity and energy in the MISO markets. The complaint further alleges that System Energy violated various other reporting and accounting requirements and should have sought prior FERC approval of the lease renewal. The complaint seeks various forms of relief from the FERC. The complaint seeks refunds for capital addition costs for all years in which they were recorded in allegedly non-formula accounts or, alternatively, the disallowance of the return on equity for the capital additions in those years plus interest. The complaint also asks that the FERC disallow and refund the lease costs of the sale-leaseback renewal on grounds of imprudence, investigate System Energy’s treatment of a DOE litigation payment, and impose certain forward-looking procedural protections, including audit rights for retail regulators of the Unit Power Sales Agreement formula rates. The APSC, MPSC, and City Council intervened in the proceeding.

In June 2018, System Energy and Entergy Services filed a motion to dismiss and an answer to the LPSC complaint denying that System Energy’s treatment of the sale-leaseback renewal and capital additions violated the terms of the filed rate or any other FERC ratemaking, accounting, or legal requirements or otherwise constituted double recovery. The response also argued that the complaint is inconsistent with a FERC-approved settlement to which the LPSC is a party and that explicitly authorizes System Energy to recover its lease payments. Finally, the response argued that both the capital additions and the sale-leaseback renewal were prudent investments and the LPSC complaint fails to justify any disallowance or refunds. The response also offered to submit formula rate protocols for the Unit Power Sales Agreement similar to the procedures used for reviewing transmission rates under the MISO tariff. In September 2018 the FERC issued an order setting the complaint for hearing and settlement proceedings. The FERC established a refund effective date of May 18, 2018.

In February 2019 the presiding ALJ ruled that the hearing ordered by the FERC includes the issue of whether specific subcategories of accumulated deferred income tax should be included in, or excluded from, System Energy’s formula rate. In March 2019 the LPSC, MPSC, APSC and City Council filed direct testimony. The LPSC testimony sought refunds that include the renewal lease payments (approximately $17.2 million per year since July 2015), rate base reductions for accumulated deferred income tax associated with uncertain tax positions, and the cost of capital additions associated with the sale-leaseback interest, as well as interest on those amounts.

In June 2019 System Energy filed answering testimony arguing that the FERC should reject all claims for refunds.  Among other things, System Energy argued that claims for refunds of the costs of lease renewal payments and capital additions should be rejected because those costs were recovered consistent with the Unit Power Sales Agreement formula rate, System Energy was not over or double recovering any costs, and ratepayers will save costs over the initial and renewal terms of the leases.  System Energy argued that claims for refunds associated with liabilities arising from uncertain tax positions should be rejected because the liabilities do not provide cost-free capital, the repayment timing of the liabilities is uncertain, and the outcome of the underlying tax positions is uncertain.  System Energy’s testimony also challenged the refund calculations supplied by the other parties.

In August 2019 the FERC trial staff filed direct and answering testimony seeking refunds for rate base reductions for liabilities associated with uncertain tax positions. The FERC trial staff also argued that System Energy recovered $32 million more than it should have in depreciation expense for capital additions. In September 2019, System Energy filed cross-answering testimony disputing the FERC trial staff’s arguments for refunds, stating that the FERC trial staff’s position regarding depreciation rates for capital additions is not unreasonable, but
explaining that any change in depreciation expense is only one element of a Unit Power Sales Agreement re-billing calculation. Adjustments to depreciation expense in any re-billing under the Unit Power Sales Agreement formula rate will also involve changes to accumulated depreciation, accumulated deferred income taxes, and other formula elements as needed. In October 2019 the LPSC filed rebuttal testimony increasing the amount of refunds sought for liabilities associated with uncertain tax positions.  The LPSC seeks approximately $512 million plus interest, which is approximately $216 million through December 31, 2021.  The FERC trial staff also filed rebuttal testimony in which it seeks refunds of a similar amount as the LPSC for the liabilities associated with uncertain tax positions.  The LPSC testimony also argued that adjustments to depreciation rates should affect rate base on a prospective basis only.

A hearing was held before a FERC ALJ in November 2019. In April 2020 the ALJ issued the initial decision. Among other things, the ALJ determined that refunds were due on three main issues. First, with regard to the lease renewal payments, the ALJ determined that System Energy is recovering an unjust acquisition premium through the lease renewal payments, and that System Energy’s recovery from customers through rates should be limited to the cost of service based on the remaining net book value of the leased assets, which is approximately $70 million. The ALJ found that the remedy for this issue should be the refund of lease payments (approximately $17.2 million per year since July 2015) with interest determined at the FERC quarterly interest rate, which would be offset by the addition of the net book value of the leased assets in the cost of service. The ALJ did not calculate a value for the refund expected as a result of this remedy. In addition, System Energy would no longer recover the lease payments in rates prospectively. Second, with regard to the liabilities associated with uncertain tax positions, the ALJ determined that the liabilities are accumulated deferred income taxes and that System Energy’s rate base should have been reduced for those liabilities. If the ALJ’s initial decision is upheld, the estimated refund for this issue through December 31, 2021, is approximately $422 million, plus interest, which is approximately $128 million through December 31, 2021. The ALJ also found that System Energy should include liabilities associated with uncertain tax positions as a rate base reduction going forward. Third, with regard to the depreciation expense adjustments, the ALJ found that System Energy should correct for the error in re-billings retroactively and prospectively, but that System Energy should not be permitted to recover interest on any retroactive return on enhanced rate base resulting from such corrections. If the initial decision is affirmed on this issue, System Energy estimates refunds of approximately $19 million, which includes interest through December 31, 2021.

The ALJ initial decision is an interim step in the FERC litigation process, and an ALJ’s determinations made in an initial decision are not controlling on the FERC. The ALJ in the initial decision acknowledges that these are issues of first impression before the FERC. In June 2020, System Energy, the LPSC, and the FERC trial staff filed briefs on exceptions, challenging several of the initial decision’s findings. System Energy’s brief on exceptions challenged the initial decision’s limitations on recovery of the lease renewal payments, its proposed rate base refund for the liabilities associated with uncertain tax positions, and its proposal to asymmetrically treat interest on bill corrections for depreciation expense adjustments. The LPSC’s and the FERC trial staff’s briefs on exceptions each challenged the initial decision’s allowance for recovery of the cost of service associated with the lease renewal based on the remaining net book value of the leased assets, its calculation of the remaining net book value of the leased assets, and the amount of the initial decision’s proposed rate base refund for the liabilities associated with uncertain tax positions. The LPSC’s brief on exceptions also challenged the initial decision’s proposal that depreciation expense adjustments include retroactive adjustments to rate base and its finding that section 203 of the Federal Power Act did not apply to the lease renewal. The FERC trial staff’s brief on exceptions also challenged the initial decision’s finding that the FERC need not institute a formal investigation into System Energy’s tariff. In October 2020, System Energy, the LPSC, the MPSC, the APSC, and the City Council filed briefs opposing exceptions. System Energy opposed the exceptions filed by the LPSC and the FERC trial staff. The LPSC, MPSC, APSC, City Council, and the FERC trial staff opposed the exceptions filed by System Energy. Also in October 2020 the MPSC, APSC, and the City Council filed briefs adopting the exceptions of the LPSC and the FERC trial staff. The case is pending before the FERC, which will review the case and issue an order on the proceeding, and the FERC may accept, reject, or modify the ALJ’s initial decision in whole or in part. Refunds, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.
In addition, in September 2020, the IRS issued a Notice of Proposed Adjustment (NOPA) and Entergy executed it. The NOPA memorializes the IRS’s decision to adjust the 2015 consolidated federal income tax return of Entergy Corporation and certain of its subsidiaries, including System Energy, with regard to the uncertain decommissioning tax position. Pursuant to the audit resolution documented in the NOPA, the IRS allowed System Energy’s inclusion of $102 million of future nuclear decommissioning costs in System Energy’s cost of goods sold for the 2015 tax year, roughly 10% of the requested deduction, but disallowed the balance of the position. In September 2020, System Energy filed a motion to lodge the NOPA into the record in the FERC proceeding. In October 2020 the LPSC, the APSC, the MPSC, the City Council, and the FERC trial staff filed oppositions to System Energy’s motion. As a result of the NOPA issued by the IRS in September 2020, System Energy filed, in October 2020, a new Federal Power Act section 205 filing at FERC to establish an ongoing rate base credit for the accumulated deferred income taxes resulting from the decommissioning uncertain tax position. On a prospective basis beginning with the October 2020 bill, System Energy proposes to include the accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position as a credit to rate base under the Unit Power Sales Agreement. In November 2020 the LPSC, APSC, MPSC, and City Council filed a protest to the filing, and System Energy responded.

In November 2020 the IRS issued a Revenue Agent’s Report (RAR) for the 2014/2015 tax year and in December 2020 Entergy executed it. The RAR contained the same adjustment to the uncertain nuclear decommissioning tax position as that which the IRS had announced in the NOPA. In December 2020, System Energy filed a motion to lodge the RAR into the record in the FERC proceeding addressing the uncertain tax position rate base issue. In January 2021 the LPSC, APSC, MPSC, and City Council filed a protest to the motion.

As a result of the RAR, in December 2020, System Energy filed amendments to its new Federal Power Act section 205 filings to establish an ongoing rate base credit for the accumulated deferred income taxes resulting from the decommissioning uncertain tax position and to credit excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position. The amendments both propose the inclusion of the RAR as support for the filings. In December 2020 the LPSC, APSC, and City Council filed a protest in response to the amendments, reiterating their prior objections to the filings. In February 2021 the FERC issued an order accepting System Energy’s Federal Power Act section 205 filings subject to refund, setting them for hearing, and holding the hearing in abeyance.

In December 2020, System Energy filed a new Federal Power Act section 205 filing to provide a one-time, historical credit of $25.2 million for the accumulated deferred income taxes that would have been created by the decommissioning uncertain tax position if the IRS’s decision had been known in 2016. In January 2021 the LPSC, APSC, MPSC, and City Council filed a protest to the filing. In February 2021 the FERC issued an order accepting System Energy’s Federal Power Act section 205 filing subject to refund, setting it for hearing, and holding the hearing in abeyance. The one-time credit was made during the first quarter 2021.

LPSC Authorization of Additional Complaints

In May 2020 the LPSC authorized its staff to file additional complaints at the FERC related to the rates charged by System Energy for Grand Gulf energy and capacity supplied to Entergy Louisiana under the Unit Power Sales Agreement. The LPSC directive notes that the initial decision issued by the presiding ALJ in the Grand Gulf sale-leaseback complaint proceeding did not address, for procedural reasons, certain rate issues raised by the LPSC and declined to order further investigation of rates charged by System Energy. The LPSC directive authorizes its staff to file complaints at the FERC “necessary to address these rate issues, to request a full investigation into the rates charged by System Energy for Grand Gulf power, and to seek rate refund, rate reduction, and such other remedies as may be necessary and appropriate to protect Louisiana ratepayers.” The LPSC directive further stated that the LPSC has seen “information suggesting that the Grand Gulf plant has been significantly underperforming compared to other nuclear plants in the United States, has had several extended and unexplained outages, and has been plagued with serious safety concerns.” The LPSC expressed concern that the costs paid by Entergy
Louisiana's retail customers may have been detrimentally impacted, and authorized “the filing of a FERC complaint to address these performance issues and to seek appropriate refund, rate reduction, and other remedies as may be appropriate.”

Unit Power Sales Agreement Complaint

The first of the additional complaints was filed by the LPSC, the APSC, the MPSC, and the City Council in September 2020. The complaint raises two sets of rate allegations: violations of the filed rate and a corresponding request for refunds for prior periods; and elements of the Unit Power Sales Agreement are unjust and unreasonable and a corresponding request for refunds for the 15-month refund period and changes to the Unit Power Sales Agreement prospectively. Several of the filed rate allegations overlap with the previous complaints. The filed rate allegations not previously raised are that System Energy: failed to provide a rate base credit to customers for the “time value” of sale-leaseback lease payments collected from customers in advance of the time those payments were due to the owner-lessors; improperly included certain lease refinancing costs in rate base as prepayments; improperly included nuclear decommissioning outage costs in rate base; failed to include categories of accumulated deferred income taxes as a reduction to rate base; charged customers based on a higher equity ratio than would be appropriate due to excessive retained earnings; and did not correctly reflect money pool investments and imprudently invested cash into the money pool. The elements of the Unit Power Sales Agreement that the complaint alleges are unjust and unreasonable include: incentive and executive compensation, lack of an equity re-opener, lobbying, and private airplane travel. The complaint also requests a rate investigation into the Unit Power Sales Agreement and System Energy’s billing practices pursuant to section 206 of the Federal Power Act, including any issue relevant to the Unit Power Sales Agreement and its inputs. System Energy filed its answer opposing the complaint in November 2020. In its answer, System Energy argued that all of the claims raised in the complaint should be dismissed and agreed that bill adjustment with respect to two discrete issues were justified. System Energy argued that dismissal is warranted because all claims fall into one or more of the following categories: the claims have been raised and are being litigated in another proceeding; the claims do not present a prima facie case and do not satisfy the threshold burden to establish a complaint proceeding; the claims are premised on a theory or request relief that is incompatible with federal law or FERC policy; the claims request relief that is inconsistent with the filed rate; the claims are barred or waived by the legal doctrine of laches; and/or the claims have been fully addressed and do not warrant further litigation. In December 2020, System Energy filed a bill adjustment report indicating that $3.4 million had been credited to customers in connection with the two discrete issues concerning the inclusion of certain accumulated deferred income taxes balances in rates. In January 2021 the complainants filed a response to System Energy’s November 2020 answer, and in February 2021, System Energy filed a response to the complainant’s response.

In May 2021 the FERC issued an order addressing the complaint, establishing a refund effective date of September 21, 2020, establishing hearing procedures, and holding those procedures in abeyance pending FERC’s review of the initial decision in the Grand Gulf sale-leaseback renewal complaint discussed above. System Energy agreed that the hearing should be held in abeyance but sought rehearing of FERC’s decision as related to matters set for hearing that were beyond the scope of FERC’s jurisdiction or authority. The complainants sought rehearing of FERC’s decision to hold the hearing in abeyance and filed a motion to proceed, which motion System Energy subsequently opposed. In June 2021, System Energy’s request for rehearing was denied by operation of law, and System Energy filed an appeal of FERC’s orders in the Court of Appeals for the Fifth Circuit. The appeal was initially stayed for a period of 90 days, but the stay expired. In November 2021 the Fifth Circuit dismissed the appeal as premature.

In August 2021 the FERC issued an order addressing System Energy’s and the complainants’ rehearing requests. The FERC dismissed part of the complaint seeking an equity re-opener, maintained the abeyance for issues related to the proceeding addressing the sale-leaseback renewal and uncertain tax positions, lifted the abeyance for issues unrelated to that proceeding, and clarified the scope of the hearing. A procedural schedule was established, with the hearing scheduled for June 2022 and the ALJ’s initial decision scheduled for November 2022. Discovery is ongoing.
In November 2021 the LPSC, APSC, and City Council filed direct testimony and requested the FERC to order refunds for prior periods and prospective amendments to the Unit Power Sales Agreement. The LPSC’s refund claims include, among other things, allegations that: (1) System Energy should not have included certain sale-leaseback transaction costs in prepayments; (2) System Energy should have credited rate base to reflect the time value of money associated with the advance collection of lease payments; (3) System Energy incorrectly included refueling outage costs that were recorded in account 174 in rate base; and (4) System Energy should have excluded several accumulated deferred income tax balances in account 190 from rate base. The LPSC is also seeking a retroactive adjustment to retained earnings and capital structure in conjunction with the implementation of its proposed refunds. In addition, the LPSC seeks amendments to the Unit Power Sales Agreement going forward to address below-the-line costs, incentive compensation, the working capital allowance, litigation expenses, and the 2019 termination of the capital funds agreement. The APSC argues that: (1) System Energy should have included borrowings from the Entergy System money pool in its determination of short-term debt in its cost of capital; and (2) System Energy should credit customers with System Energy’s allocation of earnings on money pool investments. The City Council alleges that System Energy has maintained excess cash on hand in the money pool and that retention of excess cash was imprudent. Based on this allegation, the City Council’s witness recommends a refund of approximately $98.8 million for the period 2004-September 2021 or other alternative relief. The City Council further recommends that the FERC impose a hypothetical equity ratio such as 48.15% equity to capital on a prospective basis.

In January 2022, System Energy filed answering testimony arguing that the FERC should not order refunds for prior periods or any prospective amendments to the Unit Power Sales Agreement. In response to the LPSC’s refund claims, System Energy argues, among other things, that (1) the inclusion of sale-leaseback transaction costs in prepayments was correct; (2) that the filed rate doctrine bars the request for a retroactive credit to rate base for the time value of money associated with the advance collection of lease payments; (3) that an accounting misclassification for deferred refueling outage costs has been corrected, caused no harm to customers, and requires no refunds; and (4) that its accounting and ratemaking treatment of specified accumulated deferred income tax balances in account 190 has been correct. System Energy further responds that no retroactive adjustment to retained earnings or capital structure should be ordered because there is no general policy requiring such a remedy and there was no showing that the retained earnings element of the capital structure was incorrectly implemented. Further, System Energy presented evidence that all of the costs that are being challenged were long known to the retail regulators and were approved by them for inclusion in retail rates, and the attempt to retroactively challenge these costs, some of which have been included in rates for decades, is unjust and unreasonable. In response to the LPSC’s proposed going-forward adjustments, System Energy presents evidence to show that none of the proposed adjustments are needed. On the issue of below-the-line expenses, during discovery procedures System Energy identified a historical allocation error in certain months and agreed to provide a bill credit to customers to correct the error. In response to the APSC’s claims, System Energy argues that the Unit Power Sales Agreement does not include System Energy’s borrowings from the Entergy System money pool or earnings on deposits to the Entergy System money pool in the determination of the cost of capital; and accordingly, no refunds are appropriate on those issues. In response to the City Council’s claims, System Energy argues that it has reasonably managed its cash and that the City Council’s theory of cash management is defective because it fails to adequately consider the relevant cash needs of System Energy and it makes faulty presumptions about the operation of the Entergy System money pool. System Energy further points out that the issue of its capital structure is already subject to pending FERC litigation.

Grand Gulf Prudence Complaint

The second of the additional complaints was filed at the FERC in March 2021 by the LPSC, the APSC, and the City Council against System Energy, Entergy Services, Entergy Operations, and Entergy Corporation. The second complaint contains two primary allegations. First, it alleges that, based on the plant’s capacity factor and alleged safety performance, System Energy and the other respondents imprudently operated Grand Gulf during the period 2016-2020, and it seeks refunds of at least $360 million in alleged replacement energy costs, in addition to other costs, including those that can only be identified upon further investigation. Second, it alleges that the
performance and/or management of the 2012 extended power uprate of Grand Gulf was imprudent, and it seeks refunds of all costs of the 2012 uprate that are determined to result from imprudent planning or management of the project. In addition to the requested refunds, the complaint asks that the FERC modify the Unit Power Sales Agreement to provide for full cost recovery only if certain performance indicators are met and to require pre-authorization of capital improvement projects in excess of $125 million before related costs may be passed through to customers in rates. In April 2021, System Energy and the other respondents filed their motion to dismiss and answer to the complaint. System Energy requested that the FERC dismiss the claims within the complaint. With respect to the claim concerning operations, System Energy argues that the complaint does not meet its legal burden because, among other reasons, it fails to allege any specific imprudent conduct. With respect to the claim concerning the uprate, System Energy argues that the complaint fails because, among other reasons, the complainants’ own conduct prevents them from raising a serious doubt as to the prudence of the uprate. System Energy also requests that the FERC dismiss other elements of the complaint, including the proposed modifications to the Unit Power Sales Agreement, because they are not warranted. Additional responsive pleadings were filed by the complainants and System Energy during the period from March through July 2021. The pleadings are pending FERC action.
Storm Cost Recovery Filings with Retail Regulators

Entergy Louisiana

Hurricane Laura, Hurricane Delta, Hurricane Zeta, Winter Storm Uri, and Hurricane Ida

In August 2020 and October 2020, Hurricane Laura, Hurricane Delta, and Hurricane Zeta caused significant damage to portions of Entergy Louisiana’s service area. The storms resulted in widespread outages, significant damage to distribution and transmission infrastructure, and the loss of sales during the outages. Additionally, as a result of Hurricane Laura’s extensive damage to the grid infrastructure serving the impacted area, large portions of the underlying transmission system required nearly a complete rebuild.

In October 2020, Entergy Louisiana filed an application at the LPSC seeking approval of certain ratemaking adjustments in connection with the issuance of shorter-term mortgage bonds to provide interim financing for restoration costs associated with Hurricane Laura, Hurricane Delta, and Hurricane Zeta. Subsequently, Entergy Louisiana and the LPSC staff filed a joint motion seeking approval to exclude from the derivation of Entergy Louisiana’s capital structure and cost rate of debt for ratemaking purposes, including the allowance for funds used during construction, shorter-term debt up to $1.1 billion issued by Entergy Louisiana to fund costs associated with Hurricane Laura, Hurricane Delta, and Hurricane Zeta costs on an interim basis. In November 2020 the LPSC issued an order approving the joint motion, and Entergy Louisiana issued $1.1 billion of 0.62% Series mortgage bonds due November 2023. Also in November 2020, Entergy Louisiana withdrew $257 million from its funded storm reserves.

In February 2021 two winter storms (collectively, Winter Storm Uri) brought freezing rain and ice to Louisiana. Ice accumulation sagged or downed trees, limbs and power lines, causing damage to Entergy Louisiana’s transmission and distribution systems. The additional weight of ice caused trees and limbs to fall into power lines and other electric equipment. When the ice melted, it affected vegetation and electrical equipment, causing additional outages. As discussed above in “Fuel and purchased power recovery,” Entergy Louisiana recovered the incremental fuel costs associated with Winter Storm Uri over a five-month period from April 2021 through August 2021.

In April 2021, Entergy Louisiana filed an application with the LPSC relating to Hurricane Laura, Hurricane Delta, Hurricane Zeta, and Winter Storm Uri restoration costs and in July 2021, Entergy Louisiana made a supplemental filing updating the total restoration costs. Total restoration costs for the repair and/or replacement of Entergy Louisiana’s electric facilities damaged by these storms are currently estimated to be approximately $2.06 billion, including approximately $1.68 billion in capital costs and approximately $380 million in non-capital
costs. Including carrying costs through January 2022, Entergy Louisiana is seeking an LPSC determination that $2.11 billion was prudently incurred and, therefore, is eligible for recovery from customers. Additionally, Entergy Louisiana is requesting that the LPSC determine that re-establishment of a storm escrow account to the previously authorized amount of $290 million is appropriate. In July 2021, Entergy Louisiana supplemented the application with a request regarding the financing and recovery of the recoverable storm restoration costs. Specifically, Entergy Louisiana requested approval to securitize its restoration costs pursuant to Louisiana Act 55 financing, as supplemented by Act 293 of the Louisiana Legislature’s Regular Session of 2021. As previously discussed, in August 2021, Hurricane Ida caused extensive damage to Entergy Louisiana’s distribution and, to a lesser extent, transmission systems resulting in widespread power outages. In September 2021, Entergy Louisiana supplemented the application with a request to establish and securitize a $1 billion restricted storm escrow account for Hurricane Ida related restoration costs, subject to a subsequent prudence review. In total, Entergy Louisiana requested authorization for the issuance of system restoration bonds in one or more series in an aggregate principal amount of $3.18 billion, which includes the costs of re-establishing and funding a storm damage escrow account, carrying costs and unamortized debt costs on interim financing, and issuance costs. After filing of testimony by LPSC staff and intervenors, which generally supported or did not oppose Entergy Louisiana’s requests, the parties negotiated and executed an uncontested stipulated settlement which was filed with the LPSC in February 2022. The settlement agreement contains the following key terms: $2.1 billion of restoration costs from Hurricane Laura, Hurricane Delta, Hurricane Zeta, and Winter Storm Uri were prudently incurred and are eligible for recovery; carrying costs of $51 million are recoverable; a $290 million cash storm reserve should be re-established; a $1 billion reserve should be established to partially pay for Hurricane Ida restoration costs; and Entergy Louisiana is authorized to finance $3.186 billion utilizing the securitization process authorized by Act 55, as supplemented by Act 293. The LPSC voted to approve the settlement at its February 2022 meeting.

Hurricane Isaac

In August 2012, Hurricane Isaac caused extensive damage to Entergy Louisiana’s service area.  In June 2014 the LPSC authorized Entergy Louisiana to utilize Louisiana Act 55 financing for Hurricane Isaac system restoration costs.  Entergy Louisiana committed to pass on to customers a minimum of $30.8 million of customer benefits through annual customer credits of approximately $6.2 million for five years. Approvals for the Act 55 financings were obtained from the Louisiana Utilities Restoration Corporation (LURC) and the Louisiana State Bond Commission.

In August 2014 the Louisiana Local Government Environmental Facilities and Community Development Authority (LCDA) issued $314.85 million in bonds under Louisiana Act 55.  From the $309 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $16 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $293 million directly to Entergy Louisiana.  Entergy Louisiana used the $293 million received from the LURC to acquire 2,935,152.69 Class C preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 7.5% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2014, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement. The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1.75 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

In the first quarter 2020, Entergy and the IRS agreed upon and settled on the treatment of funds received by Entergy Louisiana in conjunction with the Act 55 financing of Hurricane Isaac storm costs, which resulted in a net reduction of income tax expense of approximately $32 million. As a result of the settlement, the position was
partially sustained and Entergy Louisiana recorded a reduction of income tax expense of approximately $58 million primarily due to the reversal of liabilities for uncertain tax positions in excess of the agreed-upon settlement. Entergy recorded an increase to income tax expense of $26 million primarily resulting from the reduction of the deferred tax asset, associated with utilization of the net operating loss as a result of the settlement. This adjustment recorded by Entergy also accounted for the tax rate change of the Tax Cuts and Jobs Act. As a result of the IRS settlement, Entergy Louisiana recorded a $29 million ($21 million net-of-tax) regulatory charge and a corresponding regulatory liability to reflect its obligation to customers pursuant to the LPSC Hurricane Isaac Act 55 financing order.

Hurricane Gustav and Hurricane Ike

In September 2008, Hurricane Gustav and Hurricane Ike caused catastrophic damage to Entergy Louisiana’s service territory.  In December 2009, Entergy Louisiana entered into a stipulation agreement with the LPSC staff regarding its storm costs.  In March and April 2010, Entergy Louisiana and other parties to the proceeding filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal to utilize Act 55 financing, which included a commitment to pass on to customers a minimum of $43.3 million of customer benefits through a prospective annual rate reduction of $8.7 million for five years.  In April 2010 the LPSC approved the settlement and subsequently issued financing orders and a ratemaking order intended to facilitate the implementation of the Act 55 financings.  In June 2010 the Louisiana State Bond Commission approved the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricane Gustav and Hurricane Ike was reduced by $2.7 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2010 the LCDA issued two series of bonds totaling $713.0 million under Act 55.  From the $702.7 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $290 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $412.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana used $412.7 million to acquire 4,126,940.15 Class B preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 9% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2010, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA, and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

Hurricane Katrina and Hurricane Rita

In August and September 2005, Hurricanes Katrina and Rita caused catastrophic damage to Entergy Louisiana’s service territory. In March 2008, Entergy Louisiana and the LURC filed at the LPSC an application requesting that the LPSC grant a financing order authorizing the financing of Entergy Louisiana storm costs, storm reserves, and issuance costs pursuant to Louisiana Act 55.  Entergy Louisiana also filed an application requesting LPSC approval for ancillary issues including the mechanism to flow charges and savings to customers via a storm cost offset rider.  In April 2008 the Louisiana Public Facilities Authority (LPFA), which is the issuer of the bonds
pursuant to the Act 55 financing, approved requests for the Act 55 financing.  Also in April 2008, Entergy Louisiana and the LPSC staff filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal under the Act 55 financing, which included a commitment to pass on to customers a minimum of $40 million of customer benefits through a prospective annual rate reduction of $8 million for five years.  The LPSC subsequently approved the settlement and issued two financing orders and one ratemaking order intended to facilitate implementation of the Act 55 financing.  In May 2008 the Louisiana State Bond Commission granted final approval of the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricanes Katrina and Rita was reduced by $22.3 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2008 the LPFA issued $687.7 million in bonds under the aforementioned Act 55.  From the $679 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $152 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $527 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $545 million, including $17.8 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 5,449,861.85 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 10% annual distribution rate.  In August 2008 the LPFA issued $278.4 million in bonds under the aforementioned Act 55.  From the $274.7 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $87 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $187.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $189.4 million, including $1.7 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 1,893,918.39 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC that carry a 10% annual distribution rate.  Distributions are payable quarterly commencing on September 15, 2008 and have a liquidation price of $100 per unit.  The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.  

The bonds were repaid in 2018. Entergy and Entergy Louisiana did not report the bonds issued by the LPFA on their balance sheets because the bonds are the obligation of the LPFA, and there was no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collected a system restoration charge on behalf of the LURC and remitted the collections to the bond indenture trustee.  Entergy and Entergy Louisiana did not report the collections as revenue because Entergy Louisiana was merely acting as the billing and collection agent for the state.

Entergy Mississippi

Entergy Mississippi has approval from the MPSC to collect a storm damage provision of $1.75 million per month. If Entergy Mississippi’s accumulated storm damage provision balance exceeds $15 million, the collection of the storm damage provision ceases until such time that the accumulated storm damage provision becomes less than $10 million. Entergy Mississippi’s storm damage provision balance has been less than $10 million since May 2019, and Entergy Mississippi has been billing the monthly storm damage provision since July 2019.
Entergy New Orleans

Hurricane Zeta

In October 2020, Hurricane Zeta caused significant damage to Entergy New Orleans’s service area. The storm resulted in widespread power outages, significant damage to distribution and transmission infrastructure, and the loss of sales during the power outages. In March 2021, Entergy New Orleans withdrew $44 million from its funded storm reserves. In May 2021, Entergy New Orleans filed an application with the City Council requesting approval and certification that its system restoration costs associated with Hurricane Zeta of approximately $36 million, including approximately $28 million in capital costs and approximately $8 million in non-capital costs, were reasonable and necessary to enable Entergy New Orleans to restore electric service to its customers and Entergy New Orleans’s electric utility infrastructure.

Entergy Texas

Hurricane Laura, Hurricane Delta, and Winter Storm Uri

In August 2020 and October 2020, Hurricane Laura and Hurricane Delta caused extensive damage to Entergy Texas’s service area. In February 2021, Winter Storm Uri also caused damage to Entergy Texas’s service area. The storms resulted in widespread power outages, significant damage primarily to distribution and transmission infrastructure, and the loss of sales during the power outages. In April 2021, Entergy Texas filed an application with the PUCT requesting a determination that approximately $250 million of system restoration costs associated with Hurricane Laura, Hurricane Delta, and Winter Storm Uri, including approximately $200 million in capital costs and approximately $50 million in non-capital costs, were reasonable and necessary to enable Entergy Texas to restore electric service to its customers and Entergy Texas’s electric utility infrastructure. The filing also included the projected balance of approximately $13 million of a regulatory asset containing previously approved system restoration costs related to Hurricane Harvey. In September 2021 the parties filed an unopposed settlement agreement, pursuant to which Entergy Texas removed from the amount to be securitized approximately $4.3 million that will instead be charged to its storm reserve, $5 million related to no particular issue, of which Entergy Texas would be permitted to seek recovery in a future proceeding, and approximately $300 thousand related to attestation costs. In December 2021 the PUCT issued an order approving the unopposed settlement and determining system restoration costs of $243 million related to Hurricane Laura, Hurricane Delta, and Winter Storm Uri and the $13 million projected remaining balance of the Hurricane Harvey system restoration costs were eligible for securitization. The order also determines that Entergy Texas can recover carrying costs on the system restoration costs related to Hurricane Laura, Hurricane Delta, and Winter Storm Uri.

In July 2021, Entergy Texas filed with the PUCT an application for a financing order to approve the securitization of the system restoration costs that are the subject of the April 2021 application. In November 2021 the parties filed an unopposed settlement agreement supporting the issuance of a financing order consistent with Entergy Texas’s application and with minor adjustments to certain upfront and ongoing costs to be incurred to facilitate the issuance and serving of system restoration bonds. In January 2022 the PUCT issued a financing order consistent with the unopposed settlement.
Entergy Arkansas [Member]  
Rate And Regulatory Matters RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)
Regulatory Assets and Regulatory Liabilities

Regulatory assets represent probable future revenues associated with costs that Entergy expects to recover from customers through the regulatory ratemaking process under which the Utility business operates. Regulatory liabilities represent probable future reductions in revenues associated with amounts that Entergy expects to benefit customers through the regulatory ratemaking process under which the Utility business operates. In addition to the regulatory assets and liabilities that are specifically disclosed on the face of the balance sheets, the tables below provide detail of “Other regulatory assets” and “Other regulatory liabilities” that are included on Entergy’s and the Registrant Subsidiaries’ balance sheets as of December 31, 2021 and 2020:

Other Regulatory Assets

Entergy
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
$2,327.7 $3,027.5 
Removal costs (Note 9)
1,488.8 893.8 
Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 2 - Hurricane Ida and Storm Cost Recovery Filings with Retail Regulators and Note 5 - Securitization Bonds)
993.6 379.2 
Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
935.5 1,018.9 
Retired electric and gas meters - recovered through retail rates as determined by retail regulators
179.4 192.1 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
133.1 105.7 
Opportunity Sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding) (b)
131.8 131.8 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
113.2 16.9 
Unamortized loss on reacquired debt - recovered over term of debt
74.7 79.2 
Retail rate deferrals - recovered through formula rates or rate riders as rates are redetermined by retail regulators
66.1 66.0 
Attorney General litigation costs - recovered over a six-year period through March 2026 (b)
20.5 25.3 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
19.0 — 
New nuclear generation development costs - recovery through formula rate plan December 2014 through November 2022 (b)
6.8 14.2 
Other123.1 125.9 
Entergy Total$6,613.3 $6,076.5 
Entergy Arkansas
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
$640.0 $831.5 
Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
489.2 479.3 
Removal costs (Note 9)
224.3 212.6 
Opportunity sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding) (b)
131.8 131.8 
Retired electric meters - recovered over 15-year period through March 2034
43.4 46.9 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
39.8 9.5 
Storm damage costs - recovered either through securitization or retail rates (Note 5 - Entergy Arkansas Securitization Bonds)
39.3 42.7 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
32.6 10.5 
Unamortized loss on reacquired debt - recovered over term of debt
23.1 24.7 
ANO Fukushima and Flood Barrier costs - recovered through retail rates through February 2026 (Note 2 - Retail Rate Proceedings) (b)
7.3 9.1 
Retail rate deferrals - recovered through rate riders as rates are redetermined annually (b)
1.0 12.6 
Other17.9 21.2 
Entergy Arkansas Total$1,689.7 $1,832.4 
Entergy Louisiana
 20212020
 (In Millions)
Removal costs (Note 9)
$848.2 $302.5 
Storm damage costs, including hurricane costs - recovery expected through retail rates and securitization (Note 2 - Hurricane Ida and Storm Cost Recovery Filings with Retail Regulators)
773.6 94.0 
Pension & postretirement costs (Note 11 - Qualified Pension Plans and Non-Qualified Pension Plans) (a)
592.7 799.4 
Asset Retirement Obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
286.6 299.0 
Retired electric meters - recovered over a 22-year period through July 2041
91.7 96.4 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
56.3 48.8 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
55.0 5.4 
Unamortized loss on reacquired debt - recovered over term of debt
26.9 26.6 
New nuclear generation development costs - recovery through formula rate plan December 2014 through November 2022 (b)
6.7 14.0 
Other39.0 40.0 
Entergy Louisiana Total$2,776.7 $1,726.1 

Entergy Mississippi
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
$175.4 $242.7 
Removal costs (Note 9)
136.8 107.3 
Retail rate deferrals - returned through formula rates or rate riders as rates are redetermined annually
48.1 44.3 
Attorney General litigation costs - recovered over a six-year period through March 2026 (b)
20.5 25.3 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
19.0 — 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
15.0 19.2 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
13.8 2.0 
Unamortized loss on reacquired debt - recovered over term of debt
12.2 13.5 
Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
8.4 7.9 
Other13.2 5.1 
Entergy Mississippi Total$462.4 $467.3 
Entergy New Orleans
 20212020
 (In Millions)
Removal costs (Note 9)
$91.7 $63.2 
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
44.9 75.7 
Storm damage costs, including hurricane costs - recovered through securitization or retail rates (Note 2 - Storm Cost Recovery Filings with Retail Regulators and Note 5 - Entergy New Orleans Securitization Bonds - Hurricane Isaac)
31.2 55.2 
Retired meters - recovered over a 12-year period through July 2031 (b)
19.6 21.7 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
17.4 14.3 
Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
5.4 5.2 
Unamortized loss on reacquired debt - recovered over term of debt
1.6 1.9 
Other36.8 29.6 
Entergy New Orleans Total$248.6 $266.8 

Entergy Texas
 20212020
 (In Millions)
Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 2 - Storm Cost Recovery Filings with Retail Regulators and Note 5 - Entergy Texas Securitization Bonds - Hurricane Rita and Entergy Texas Securitization Bonds - Hurricane Ike and Hurricane Gustav)
$143.1 $187.3 
Removal costs (Note 9)
98.1 115.3 
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
96.0 140.1 
Retired electric meters - recovered over 13-year period through February 2032
23.7 26.0 
Neches and Sabine costs - recovered over a 10-year period through September 2028 (Note 2 - Retail Rate Proceedings)
16.4 18.8 
Pension & postretirement benefits expense deferral - recovery period to be determined (Note 11 - Entergy Texas Reserve)
14.6 3.8 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
11.7 12.9 
Unamortized loss on reacquired debt - recovered over term of debt
9.8 10.5 
Other7.9 10.0 
Entergy Texas Total$421.3 $524.7 
System Energy
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans and Other Postretirement Benefits) (a)
$160.3 $217.8 
Asset retirement obligation - recovery dependent upon timing of decommissioning (Note 9) (a)
144.4 226.3 
Removal costs - recovered through depreciation rates (Note 9)
89.7 92.9 
Unamortized loss on reacquired debt - recovered over term of debt
1.1 2.0 
System Energy Total$395.5 $539.0 

(a)Does not earn a return on investment, but is offset by related liabilities.
(b)Does not earn a return on investment.

Hurricane Ida

In August 2021, Hurricane Ida caused extensive damage to the Entergy distribution and, to a lesser extent, transmission systems across Louisiana resulting in widespread power outages. Total restoration costs for the repair and/or replacement of the electrical system damaged by Hurricane Ida for Entergy Louisiana and Entergy New Orleans are currently estimated to be approximately $2.7 billion. Also, Utility revenues in 2021 were adversely affected by extended power outages resulting from the hurricane.

Entergy has recorded accounts payable for the estimated costs incurred that were necessary to return customers to service. Entergy recorded corresponding regulatory assets of approximately $1.1 billion, including $1 billion at Entergy Louisiana and $80 million at Entergy New Orleans, and construction work in progress of approximately $1.6 billion, including $1.5 billion at Entergy Louisiana and $120 million at Entergy New Orleans. Entergy recorded the regulatory assets in accordance with its accounting policies and based on the historic treatment of such costs in its service area because management believes that recovery through some form of regulatory mechanism is probable. There are well-established mechanisms and precedent for addressing these catastrophic events and providing for recovery of prudently incurred storm costs in accordance with applicable regulatory and legal principles. Because Entergy has not gone through the regulatory process regarding these storm costs, there is an element of risk, and Entergy is unable to predict with certainty the degree of success it may have in its recovery initiatives, the amount of restoration costs that it may ultimately recover, or the timing of such recovery.

Entergy is considering all available avenues to recover storm-related costs from Hurricane Ida, including federal government assistance and securitization financing. In September 2021, Entergy Louisiana filed an application at the LPSC seeking approval of certain ratemaking adjustments in connection with the issuance of approximately $1 billion of shorter-term mortgage bonds to provide interim financing for restoration costs associated with Hurricane Ida, which bonds were issued in October 2021. Also in September 2021, as discussed below in “Storm Cost Filings with Retail Regulators - Entergy Louisiana - Hurricane Laura, Hurricane Delta, Hurricane Zeta, Winter Storm Uri, and Hurricane Ida,” Entergy Louisiana sought approval for the creation and funding of a $1 billion restricted escrow account for Hurricane Ida restoration costs, subject to a subsequent prudence review. In September 2021, Entergy New Orleans withdrew $39 million from its funded storm reserves. Storm cost recovery or financing will be subject to review by applicable regulatory authorities. In February 2022, Entergy New Orleans filed with the City Council a securitization application requesting that the City Council review Entergy New Orleans’s storm reserve and increase the storm reserve funding level to $150 million, to be funded through securitization.
Other Regulatory Liabilities

Entergy
 20212020
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$1,993.3 $1,694.1 
Louisiana Act 55 financing savings obligation (Note 3) (b)
127.4 144.3 
Retail rate over-recovery - refunded through formula rate or rate riders as rates are redetermined annually
126.5 75.1 
Vidalia purchased power agreement (Note 8) (b)
106.2 115.7 
Grand Gulf sale-leaseback - (Note 5 - Grand Gulf Sale-Leaseback Transactions)
55.6 55.6 
Asset retirement obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
45.5 29.7 
Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4 44.4 
Internal restructuring guaranteed tax credits19.8 26.4 
Deferred tax equity partnership earnings (Note 1)
18.1 — 
Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates December 2015 through November 2024
16.0 21.5 
Advanced metering system (AMS) surcharge - return to customers dependent upon AMS spend
7.3 20.1 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
— 43.5 
Other83.7 53.5 
Entergy Total$2,643.8 $2,323.9 

Entergy Arkansas
 20212020
 (In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$685.4 $597.4 
Internal restructuring guaranteed customer credits19.8 26.4 
Retail rate rider over-recovery - refunded through rate riders as rates are redetermined annually
18.9 19.6 
Deferred tax equity partnership earnings (Note 1)
18.1 — 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
— 43.5 
Other1.1 — 
Entergy Arkansas Total$743.3 $686.9 
Entergy Louisiana
 20212020
 (In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$692.2 $567.7 
Louisiana Act 55 financing savings obligation (Note 3)
127.4 144.3 
Vidalia purchased power agreement (Note 8) (b)
106.2 115.7 
Asset retirement obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
45.5 29.7 
Retail rate rider over-recovery - refunded through rate riders as rates are determined annually
30.7 36.0 
Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates December 2015 through November 2024
16.0 21.5 
Derivative Instruments & Hedging Activities (Note 15)
11.4 — 
Other13.2 3.4 
Entergy Louisiana Total$1,042.6 $918.3 

Entergy Mississippi
 20212020
 (In Millions)
Retail rate rider over-recovery - refunded through rate riders as rates are redetermined annually
$34.2 $14.2 
Grand Gulf over-recovery - returned to customers through rate riders as rates are redetermined annually
15.1 1.0 
Other— 0.6 
Entergy Mississippi Total$49.3 $15.8 

Entergy Texas
 20212020
 (In Millions)
Retail refunds - return to customers to be determined
$22.8 $— 
Advanced metering system (AMS) surcharge - returned to customers dependent upon AMS spend
7.3 20.1 
Income tax rate change - refunded through a rate rider (Note 2 - Retail Rate Proceedings)
2.7 6.5 
Transition to competition costs - returned to customers through rate riders when rates are redetermined periodically
— 3.2 
Other 4.3 2.5 
Entergy Texas Total$37.1 $32.3 
System Energy
 20212020
 (In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$615.7 $529.0 
Grand Gulf sale-leaseback - (Note 5 - Grand Gulf Sale-Leaseback Transactions)
55.6 55.6 
Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4 44.4 
Grand Gulf sale-leaseback accumulated deferred income taxes (a)
25.6 25.7 
Entergy Mississippis accumulated accelerated Grand Gulf amortization - amortized and credited through the Unit Power Sales Agreement
3.6 10.7 
System Energy Total$744.9 $665.4 

(a)Offset by related asset.
(b)As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21% effective January 2018, the Vidalia purchased power agreement regulatory liability was reduced by $30.5 million and the Louisiana Act 55 financing savings obligation regulatory liabilities were reduced by $25 million, with corresponding increases to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

Regulatory activity regarding the Tax Cuts and Jobs Act

See the “Other Tax Matters - Tax Cuts and Jobs Act” section in Note 3 to the financial statements for discussion of the effects of the December 2017 enactment of the Tax Cuts and Jobs Act (Tax Act), including its effects on Entergy’s and the Registrant Subsidiaries’ regulatory asset/liability for income taxes.

Entergy Arkansas

Consistent with its previously stated intent to return unprotected excess accumulated deferred income taxes to customers as expeditiously as possible, Entergy Arkansas initiated a tariff proceeding in February 2018 proposing to establish a tax adjustment rider to provide retail customers with certain tax benefits of $467 million associated with the Tax Act. For the residential customer class, unprotected excess accumulated deferred income taxes were returned to customers over a 21-month period from April 2018 through December 2019. For all other customer classes, unprotected excess accumulated deferred income taxes were returned to customers over a nine-month period from April 2018 through December 2018. A true-up provision also was included in the rider, with any over- or under-returned unprotected excess accumulated deferred income taxes credited or billed to customers during the billing month of January 2020, with any residual amounts of over- or under-returned unprotected excess accumulated deferred income taxes to be flowed through Entergy Arkansas’s energy cost recovery rider. In March 2018 the APSC approved the tax adjustment rider effective with the first billing cycle of April 2018.

As discussed below, in July 2018, Entergy Arkansas made its formula rate plan filing to set its formula rate for the 2019 calendar year. A hearing was held in May 2018 regarding the APSC’s inquiries into the effects of the Tax Act, including Entergy Arkansas’s proposal to utilize its formula rate plan rider for its customers to realize the remaining benefits of the Tax Act. Entergy Arkansas’s formula rate plan rider included a netting adjustment that compared actual annual results to the allowed rate of return on common equity. In July 2018 the APSC issued an order agreeing with Entergy Arkansas’s proposal to have the effects of the Tax Act on current income tax expense flow through Entergy Arkansas’s formula rate plan rider and with Entergy Arkansas’s treatment of protected and unprotected excess accumulated deferred income taxes. The APSC also directed Entergy Arkansas to submit in the tax adjustment rider proceeding, discussed above, the adjustments to all other riders affected by the Tax Act and to include an amendment for a true up mechanism where a rider affected by the Tax Act does not already contain a
true-up mechanism. Pursuant to a 2018 settlement agreement in Entergy Arkansas’s formula rate plan proceeding, Entergy Arkansas also removed the net operating loss accumulated deferred income tax asset caused by the Tax Act from Entergy Arkansas’s tax adjustment rider. Entergy Arkansas’s compliance tariff filings were accepted by the APSC in October 2018. In February 2021, pursuant to its 2020 formula rate plan evaluation report settlement, Entergy Arkansas flowed $5.6 million in credits to customers through the tax adjustment rider based on the outcome of certain federal tax positions and a decrease in the state tax rate.

Entergy Louisiana

In an electric formula rate plan settlement approved by the LPSC in April 2018 the parties agreed that Entergy Louisiana would return to customers one-half of its eligible unprotected excess deferred income taxes from May 2018 through December 2018 and return to customers the other half from January 2019 through August 2022. In addition, the settlement provided that in order to flow back to customers certain other tax benefits created by the Tax Act, Entergy Louisiana established a regulatory liability effective January 1, 2018 in the amount of $9.1 million per month to reflect these tax benefits already included in retail rates until new base rates under the formula rate plan were established in September 2018, and this regulatory liability was returned to customers over the September 2018 through August 2019 formula rate plan rate-effective period. The LPSC staff and intervenors in the settlement reserved the right to obtain data from Entergy Louisiana to confirm the determination of excess accumulated deferred income taxes resulting from the Tax Act and the analysis thereof as part of the formula rate plan review proceeding for the 2017 test year filing which, as discussed below, Entergy Louisiana filed in June 2018.

Entergy New Orleans

After enactment of the Tax Act the City Council passed a resolution ordering Entergy New Orleans to, effective January 1, 2018, record deferred regulatory liabilities to account for the Tax Act’s effect on Entergy New Orleans’s revenue requirement and to make a filing by mid-March 2018 regarding the Tax Act’s effects on Entergy New Orleans’s operating income and rate base and potential mechanisms for customers to receive benefits of the Tax Act. The City Council’s resolution also directed Entergy New Orleans to request that Entergy Services file with the FERC for revisions of the Unit Power Sales Agreement and MSS-4 replacement tariffs to address the return of excess accumulated deferred income taxes. Entergy submitted filings of this type to the FERC.

In March 2018, Entergy New Orleans filed its response to the resolution stating that the Tax Act reduced income tax expense from what was then reflected in rates by approximately $8.2 million annually for electric operations and by approximately $1.3 million annually for gas operations. In the filing, Entergy New Orleans proposed to return to customers from June 2018 through August 2019 the benefits of the reduction in income tax expense and its unprotected excess accumulated deferred income taxes through a combination of bill credits and investments in energy efficiency programs, grid modernization, and Smart City projects. Entergy New Orleans submitted supplemental information in April 2018 and May 2018. Shortly thereafter, Entergy New Orleans and the City Council’s advisors reached an agreement in principle that provides for benefits that will be realized by Entergy New Orleans customers through bill credits that started in July 2018 and offsets to future investments in energy efficiency programs, grid modernization, and Smart City projects, as well as additional benefits related to the filings made at the FERC. The agreement in principle was approved by the City Council in June 2018.

Entergy Texas

After enactment of the Tax Act the PUCT issued an order requiring most utilities, including Entergy Texas, beginning January 25, 2018, to record a regulatory liability for the difference between revenues collected under existing rates and revenues that would have been collected had existing rates been set using the new federal income tax rates and also for the balance of excess accumulated deferred income taxes. Entergy Texas had previously provided information to the PUCT staff and stated that it expected the PUCT to address the lower tax expense as part of Entergy Texas’s rate case expected to be filed in May 2018.
In May 2018, Entergy Texas filed its 2018 base rate case with the PUCT. Entergy Texas’s proposed rates and revenues reflected the inclusion of the federal income tax reductions due to the Tax Act. The PUCT issued an order in December 2018 establishing that 1) $25 million be credited to customers through a rider to reflect the lower federal income tax rate applicable to Entergy Texas from January 2018 through the date new rates were implemented, 2) $242.5 million of protected excess accumulated deferred income taxes be returned to customers through base rates under the average rate assumption method over the lives of the associated assets, and 3) $185.2 million of unprotected excess accumulated deferred income taxes be returned to customers through a rider. The unprotected excess accumulated deferred income taxes rider includes carrying charges and is in effect over a period of 12 months for larger customers and over a period of four years for other customers.

System Energy

In a filing made with the FERC in March 2018, System Energy proposed revisions to the Unit Power Sales Agreement to reflect the effects of the Tax Act. In the filing System Energy proposed to return identified quantities of unprotected excess accumulated deferred income taxes to its customers by the end of 2018. In May 2018 the FERC accepted System Energy’s proposed tax revisions with an effective date of June 1, 2018, subject to refund and the outcome of settlement and hearing procedures. Settlement discussions were terminated in April 2019, and a hearing was held in March 2020. The retail regulators of the Utility operating companies that are parties to the Unit Power Sales Agreement challenged the treatment and amount of excess accumulated deferred income tax liabilities associated with uncertain tax positions related to nuclear decommissioning. In July 2020 the presiding ALJ in the proceeding issued an initial decision finding that there is an additional $147 million in unprotected excess accumulated deferred income taxes related to System Energy’s uncertain decommissioning tax deduction. The initial decision determined that System Energy should have included the $147 million in its March 2018 filing. System Energy had not included credits related to the effect of the Tax Act on the uncertain decommissioning tax position because it was uncertain whether the IRS would allow the deduction. The initial decision rejected both System Energy’s alternative argument that any crediting should occur over a ten-year period and the retail regulators’ argument that any crediting should occur over a two-year period. Instead, the initial decision concluded that System Energy should credit the additional unprotected excess accumulated deferred income taxes in a single lump sum revenue requirement reduction following a FERC order addressing the initial decision.

The ALJ initial decision is an interim step in the FERC litigation process. In September 2020, System Energy filed a brief on exceptions with the FERC, re-urging its positions and requesting the reversal of the ALJ’s initial decision. In December 2020, the LPSC, APSC, MPSC, City Council, and FERC trial staff filed briefs opposing exceptions. The FERC will review the case and issue an order in the proceeding, and the FERC may accept, reject, or modify the ALJ’s initial decision in whole or in part. Credits, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.

As discussed below in Grand Gulf Sale-leaseback Renewal Complaint and Uncertain Tax Position Rate Base Issue,” in September 2020 the IRS issued a Notice of Proposed Adjustment (NOPA) and Entergy executed it. In September 2020, System Energy filed a motion to lodge the NOPA into the record in the FERC proceeding. In October 2020 the LPSC, APSC, MPSC, City Council, and FERC trial staff filed oppositions to System Energy’s motion. As a result of the NOPA, System Energy filed, in October 2020, a new Federal Power Act section 205 filing at the FERC to credit the excess accumulated deferred income taxes resulting from the decommissioning uncertain tax position. System Energy proposes to credit the entire amount of the excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position by issuing a one-time credit of $17.8 million. In November 2020, the LPSC, APSC, MPSC, and City Council filed a protest to the filing, and System Energy responded.

In November 2020 the IRS issued the Revenue Agent’s Report (RAR) for the 2014-2015 tax years and in December 2020 Entergy executed it. In December 2020, System Energy filed a motion to lodge the RAR into the record in the FERC proceeding addressing the Tax Cuts and Jobs Act. In January 2021 the LPSC, APSC, MPSC,
and City Council filed a joint answer opposing System Energy’s motion, and the FERC trial staff also filed an answer opposing System Energy’s motion.

As a result of the RAR, in December 2020, System Energy also filed an amendment to its Federal Power Act section 205 filing to credit excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position. The amendment proposed the inclusion of the RAR as support for the filing. In December 2020, the LPSC, APSC, and City Council filed a protest in response to the amendment, reiterating objections to the filing to credit excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position. In February 2021 the FERC issued an order accepting System Energy’s Federal Power Act section 205 filing subject to refund, setting it for hearing, and holding the hearing in abeyance.

In November 2020, System Energy filed a motion to vacate the ALJ’s decision, arguing that it had been overtaken by changed circumstances because of the IRS’s determination resulting from the NOPA and RAR. In January 2021 the LPSC, APSC, MPSC, and City Council filed a joint answer opposing System Energy’s motion, and the FERC trial staff also filed an answer opposing System Energy’s motion. Additional responsive pleadings were filed in February and March 2021. There is no formal deadline for FERC to rule on the motion.

Fuel and purchased power cost recovery

The Utility operating companies are allowed to recover fuel and purchased power costs through fuel mechanisms included in electric and gas rates that are recorded as fuel cost recovery revenues.  The difference between revenues collected and the current fuel and purchased power costs is generally recorded as “Deferred fuel costs” on the Utility operating companies’ financial statements.  The table below shows the amount of deferred fuel costs as of December 31, 2021 and 2020 that Entergy expects to recover (or return to customers) through fuel mechanisms, subject to subsequent regulatory review.

 20212020
 (In Millions)
Entergy Arkansas (a)$177.6 $15.2 
Entergy Louisiana (b)$213.5 $170.4 
Entergy Mississippi$121.9 ($14.7)
Entergy New Orleans (b)($3.5)$6.2 
Entergy Texas$48.3 ($85.4)

(a)Includes $68.8 million in 2021 and $68.2 million in 2020 of fuel and purchased power costs whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.
(b)Includes $168.1 million in both years for Entergy Louisiana and $4.1 million in both years for Entergy New Orleans of fuel, purchased power, and capacity costs, which do not currently earn a return on investment and whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.

Entergy Arkansas

Energy Cost Recovery Rider

Entergy Arkansas’s retail rates include an energy cost recovery rider to recover fuel and purchased energy costs in monthly customer bills.  The rider utilizes the prior calendar-year energy costs and projected energy sales for the twelve-month period commencing on April 1 of each year to develop an energy cost rate, which is redetermined annually and includes a true-up adjustment reflecting the over- or under-recovery, including carrying
charges, of the energy costs for the prior calendar year.  The energy cost recovery rider tariff also allows an interim rate request depending upon the level of over- or under-recovery of fuel and purchased energy costs.

In January 2014, Entergy Arkansas filed a motion with the APSC relating to its upcoming energy cost rate redetermination filing that was made in March 2014. In that motion, Entergy Arkansas requested that the APSC authorize Entergy Arkansas to exclude from the redetermination of its 2014 energy cost rate $65.9 million of incremental fuel and replacement energy costs incurred in 2013 as a result of the ANO stator incident. Entergy Arkansas requested that the APSC authorize Entergy Arkansas to retain that amount in its deferred fuel balance, with recovery to be reviewed in a later period after more information was available regarding various claims associated with the ANO stator incident. In February 2014 the APSC approved Entergy Arkansas’s request to retain that amount in its deferred fuel balance. In July 2017, Entergy Arkansas filed for a change in rates pursuant to its formula rate plan rider. In that proceeding, the APSC approved a settlement agreement agreed upon by the parties, including a provision that requires Entergy Arkansas to initiate a regulatory proceeding for the purpose of recovering funds currently withheld from rates and related to the stator incident, including the $65.9 million of deferred fuel and purchased energy costs previously noted, subject to certain timelines and conditions set forth in the settlement agreement. In October 2021 the APSC approved Entergy Arkansas’s second request to extend the deadline for initiating a regulatory proceeding for the purpose of recovering funds related to the stator incident for twelve additional months, or until December 1, 2022. See the “ANO Damage, Outage, and NRC Reviews” section in Note 8 to the financial statements for further discussion of the ANO stator incident.

In March 2017, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01164 per kWh to $0.01547 per kWh. The APSC staff filed testimony in March 2017 recommending that the redetermined rate be implemented with the first billing cycle of April 2017 under the normal operation of the tariff. Accordingly, the redetermined rate went into effect on March 31, 2017 pursuant to the tariff. In July 2017 the Arkansas Attorney General requested additional information to support certain of the costs included in Entergy Arkansas’s 2017 energy cost rate redetermination.

In March 2018, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01547 per kWh to $0.01882 per kWh. The Arkansas Attorney General filed a response to Entergy Arkansas’s annual redetermination filing requesting that the APSC suspend the proposed tariff to investigate the amount of the redetermination or, alternatively, to allow recovery subject to refund. Among the reasons the Attorney General cited for suspension were questions pertaining to how Entergy Arkansas forecasted sales and potential implications of the Tax Cuts and Jobs Act. Entergy Arkansas replied to the Attorney General’s filing and stated that, to the extent there are questions pertaining to its load forecasting or the operation of the energy cost recovery rider, those issues exceed the scope of the instant rate redetermination. Entergy Arkansas also stated that potential effects of the Tax Cuts and Jobs Act are appropriately considered in the APSC’s separate proceeding regarding potential implications of the tax law. The APSC general staff filed a reply to the Attorney General’s filing and agreed that Entergy Arkansas’s filing complied with the terms of the energy cost recovery rider. The redetermined rate became effective with the first billing cycle of April 2018. Subsequently in April 2018 the APSC issued an order declining to suspend Entergy Arkansas’s energy cost recovery rider rate and declining to require further investigation at that time of the issues suggested by the Attorney General in the proceeding. Following a period of discovery, the Attorney General filed a supplemental response in October 2018 raising new issues with Entergy Arkansas’s March 2018 rate redetermination and asserting that $45.7 million of the increase should be collected subject to refund pending further investigation. Entergy Arkansas filed to dismiss the Attorney General’s supplemental response, the APSC general staff filed a motion to strike the Attorney General’s filing, and the Attorney General filed a supplemental response disputing Entergy Arkansas and the APSC staff’s filing. Applicable APSC rules and processes authorize its general staff to initiate periodic audits of Entergy Arkansas’s energy cost recovery rider. In late-2018 the APSC general staff notified Entergy Arkansas it has initiated an audit of the 2017 fuel costs. The time in which the audit will be complete is uncertain at this time.
In March 2019, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected a decrease from $0.01882 per kWh to $0.01462 per kWh and became effective with the first billing cycle in April 2019. In March 2019 the Arkansas Attorney General filed a response to Entergy Arkansas’s annual adjustment and included with its filing a motion for investigation of alleged overcharges to customers in connection with the FERC’s October 2018 order in the opportunity sales proceeding. Entergy Arkansas filed its response to the Attorney General’s motion in April 2019 in which Entergy Arkansas stated its intent to initiate a proceeding to address recovery issues related to the October 2018 FERC order. In May 2019, Entergy Arkansas initiated the opportunity sales recovery proceeding, discussed below, and requested that the APSC establish that proceeding as the single designated proceeding in which interested parties may assert claims related to the appropriate retail rate treatment of the FERC October 2018 order and related FERC orders in the opportunity sales proceeding. In June 2019 the APSC granted Entergy Arkansas’s request and also denied the Attorney General’s motion in the energy cost recovery proceeding seeking an investigation into Entergy Arkansas’s annual energy cost recovery rider adjustment and referred the evaluation of such matters to the opportunity sales recovery proceeding.

In March 2020, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected a decrease from $0.01462 per kWh to $0.01052 per kWh. The redetermined rate became effective with the first billing cycle in April 2020 through the normal operation of the tariff.

In March 2021, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected a decrease from $0.01052 per kWh to $0.00959 per kWh. The redetermined rate calculation also included an adjustment to account for a portion of the increased fuel costs resulting from the February 2021 winter storms. The redetermined rate became effective with the first billing cycle in April 2021 through the normal operation of the tariff.

Entergy Louisiana

Entergy Louisiana recovers electric fuel and purchased power costs for the billing month based upon the level of such costs incurred two months prior to the billing month. Entergy Louisiana’s purchased gas adjustments include estimates for the billing month adjusted by a surcharge or credit that arises from an annual reconciliation of fuel costs incurred with fuel cost revenues billed to customers, including carrying charges.

In July 2014 the LPSC authorized its staff to initiate an audit of the fuel adjustment clause filings by Entergy Gulf States Louisiana, whose business was combined with Entergy Louisiana in 2015. The audit includes a review of the reasonableness of charges flowed through Entergy Gulf States Louisiana’s fuel adjustment clause for the period from 2010 through 2013. In January 2019 the LPSC staff consultant issued its audit report. In its report, the LPSC staff consultant recommended that Entergy Louisiana refund approximately $900,000, plus interest, to customers based upon the imputation of a claim of vendor fault in servicing its nuclear plant. Entergy Louisiana recorded a provision in the first quarter 2019 for the potential outcome of the audit. In August 2019, Entergy Louisiana filed direct testimony challenging the basis for the LPSC staff’s recommended disallowance and providing an alternative calculation of replacement power costs should it be determined that a disallowance is appropriate. Entergy Louisiana’s calculation would require no refund to customers.

In July 2014 the LPSC authorized its staff to initiate an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed by Entergy Louisiana through its fuel adjustment clause for the period from 2010 through 2013. In January 2019 the LPSC staff issued its audit report recommending that Entergy Louisiana refund approximately $7.3 million, plus interest, to customers based upon the imputation of a claim of vendor fault in servicing its nuclear plant. Entergy Louisiana recorded a provision in the first quarter 2019 for the potential outcome of the audit. In August 2019, Entergy Louisiana filed direct testimony challenging the basis for the LPSC staff’s recommended disallowance and providing an alternative calculation of replacement power costs should it be determined that a disallowance is appropriate. Entergy Louisiana’s calculation
would require a refund to customers of approximately $4.3 million, plus interest, as compared to the LPSC staff’s recommendation of $7.3 million, plus interest. Responsive testimony was filed by the LPSC staff and intervenors in September 2019; all parties either agreed with or did not oppose Entergy Louisiana’s alternative calculation of replacement power costs.

In November 2019 the pending LPSC proceedings for the 2010-2013 Entergy Louisiana and Entergy Gulf States Louisiana audits were consolidated to facilitate a settlement of both fuel audits. In December 2019 an unopposed settlement was reached that requires a refund to legacy Entergy Louisiana customers of approximately $2.3 million, including interest, and no refund to legacy Entergy Gulf States Louisiana customers. The LPSC approved the settlement in January 2020. A one-time refund was made in February 2020.

In March 2020 the LPSC staff provided notice of an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s fuel adjustment clause for the period from 2016 through 2019. In September 2021 the LPSC submitted its audit report and found that all costs recovered through the fuel adjustment clause were reasonable and eligible for recovery through the fuel adjustment clause. Intervenors are conducting discovery regarding the LPSC staff’s report.

In February 2021, Entergy Louisiana incurred extraordinary fuel costs associated with the February 2021 winter storms. To mitigate the effect of these costs on customer bills, in March 2021 Entergy Louisiana requested and the LPSC approved the deferral and recovery of $166 million in incremental fuel costs over five months beginning in April 2021. The incremental fuel costs remain subject to review for reasonableness and eligibility for recovery through the fuel adjustment clause mechanism. The final amount of incremental fuel costs is subject to change through the resettlement process. At its April 2021 meeting, the LPSC authorized its staff to review the prudence of the February 2021 fuel costs incurred by all LPSC-jurisdictional utilities. At its June 2021 meeting, the LPSC approved the hiring of consultants to assist its staff in this review. Discovery is ongoing.

In March 2021 the LPSC staff provided notice of an audit of Entergy Louisiana’s purchased gas adjustment clause filings covering the period January 2018 through December 2020. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s purchased gas adjustment clause for that period. Discovery is ongoing, and no audit report has been filed.

Entergy Mississippi

Entergy Mississippi’s rate schedules include an energy cost recovery rider that is adjusted annually to reflect accumulated over- or under-recoveries.  Entergy Mississippi’s fuel cost recoveries are subject to annual audits conducted pursuant to the authority of the MPSC.

In November 2018, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an under-recovery of approximately $57 million as of September 30, 2018. In January 2019 the MPSC approved the proposed energy cost factor effective for February 2019 bills.

In November 2019, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation included $39.6 million of prior over-recovery flowing back to customers beginning February 2020. Entergy Mississippi’s balance in its deferred fuel account did not decrease as expected after implementation of the new factor. In an effort to assist customers during the COVID-19 pandemic, in May 2020, Entergy Mississippi requested an interim adjustment to the energy cost recovery rider to credit approximately $50 million from the over-recovered balance in the deferred fuel account to customers over four consecutive billing months. The MPSC approved this interim adjustment in May 2020 effective for June through September 2020 bills.
In November 2020, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an over-recovery of approximately $24.4 million as of September 30, 2020. In January 2021 the MPSC approved the proposed energy cost factor effective for February 2021 bills.

In November 2021, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an under-recovery of approximately $80.6 million as of September 30, 2021. In December 2021, at the request of the MPSC, Entergy Mississippi submitted a proposal to mitigate the impact of rising fuel costs on customer bills during 2022. Entergy Mississippi proposed that the deferred fuel balance as of December 31, 2021, which was $121.9 million, be amortized over three years, and that the MPSC authorize Entergy Mississippi to apply its weighted-average cost of capital as the carrying cost for the unamortized fuel balance. In January 2022 the MPSC approved the amortization of $100 million of the deferred fuel balance over two years and authorized Entergy Mississippi to apply its weighted-average cost of capital as the carrying cost for the unamortized fuel balance. The MPSC approved the proposed energy cost factor effective for February 2022 bills.

Entergy New Orleans

Entergy New Orleans’s electric rate schedules include a fuel adjustment tariff designed to reflect no more than targeted fuel and purchased power costs, adjusted by a surcharge or credit for deferred fuel expense arising from the monthly reconciliation of actual fuel and purchased power costs incurred with fuel cost revenues billed to customers, including carrying charges.

Entergy New Orleans’s gas rate schedules include a purchased gas adjustment to reflect estimated gas costs for the billing month, adjusted by a surcharge or credit similar to that included in the electric fuel adjustment clause, including carrying charges.

Entergy Texas

Entergy Texas’s rate schedules include a fixed fuel factor to recover fuel and purchased power costs, including interest, not recovered in base rates.  Semi-annual revisions of the fixed fuel factor are made in March and September based on the market price of natural gas and changes in fuel mix.  The amounts collected under Entergy Texas’s fixed fuel factor and any interim surcharge or refund are subject to fuel reconciliation proceedings before the PUCT. A fuel reconciliation is required to be filed at least once every three years and outside of a base rate case filing.

In September 2019, Entergy Texas filed an application to reconcile its fuel and purchased power costs for the period from April 2016 through March 2019. During the reconciliation period, Entergy Texas incurred approximately $1.6 billion in Texas jurisdictional eligible fuel and purchased power expenses, net of certain revenues credited to such expenses and other adjustments. Entergy Texas estimated an under-recovery balance of approximately $25.8 million, including interest, which Entergy Texas requested authority to carry over as the beginning balance for the subsequent reconciliation period beginning April 2019. In March 2020 an intervenor filed testimony proposing that the PUCT disallow: (1) $2 million in replacement power costs associated with generation outages during the reconciliation period; and (2) $24.4 million associated with the operation of the Spindletop natural gas storage facility during the reconciliation period.  In April 2020, Entergy Texas filed rebuttal testimony refuting all points raised by the intervenor.  In June 2020 the parties filed a stipulation and settlement agreement, which included a $1.2 million disallowance not associated with any particular issue raised by any party. The PUCT approved the settlement in August 2020.

In July 2020, Entergy Texas filed an application with the PUCT to implement an interim fuel refund of $25.5 million, including interest. Entergy Texas proposed that the interim fuel refund be implemented beginning with the first August 2020 billing cycle over a three-month period for smaller customers and in a lump sum amount
in the billing month of August 2020 for transmission-level customers. The interim fuel refund was approved in July 2020, and Entergy Texas began refunds in August 2020.

In February 2021, Entergy Texas filed an application to implement a fuel refund for a cumulative over-recovery of approximately $75 million that is primarily attributable to settlements received by Entergy Texas from MISO related to Hurricane Laura. Entergy Texas planned to issue the refund over the period of March through August 2021. On February 22, 2021, Entergy Texas filed a motion to abate its fuel refund proceeding to assess how the February 2021 winter storm impacted Entergy Texas’s fuel over-recovery position. In March 2021, Entergy Texas withdrew its application to implement the fuel refund. Entergy Texas is continuing to evaluate its fuel balance and will file a subsequent refund or surcharge application consistent with the requirements of the PUCT’s rules.
Entergy Arkansas Opportunity Sales Proceeding

In June 2009 the LPSC filed a complaint requesting that the FERC determine that certain of Entergy Arkansas’s sales of electric energy to third parties: (a) violated the provisions of the System Agreement that allocated the energy generated by Entergy System resources; (b) imprudently denied the Entergy System and its ultimate consumers the benefits of low-cost Entergy System generating capacity; and (c) violated the provision of the System Agreement that prohibited sales to third parties by individual companies absent an offer of a right-of-first-refusal to other Utility operating companies.  The LPSC’s complaint challenged sales made beginning in 2002 and requested refunds.  In July 2009 the Utility operating companies filed a response to the complaint arguing among other things that the System Agreement contemplates that the Utility operating companies may make sales to third parties for their own account, subject to the requirement that those sales be included in the load (or load shape) for the applicable Utility operating company.  The FERC subsequently ordered a hearing in the proceeding.

After a hearing, the ALJ issued an initial decision in December 2010.  The ALJ found that the System Agreement allowed for Entergy Arkansas to make the sales to third parties but concluded that the sales should be accounted for in the same manner as joint account sales.  The ALJ concluded that “shareholders” should make refunds of the damages to the Utility operating companies, along with interest.  Entergy disagreed with several aspects of the ALJ’s initial decision and in January 2011 filed with the FERC exceptions to the decision.
The FERC issued a decision in June 2012 and held that, while the System Agreement is ambiguous, it does provide authority for individual Utility operating companies to make opportunity sales for their own account and Entergy Arkansas made and priced these sales in good faith.  The FERC found, however, that the System Agreement does not provide authority for an individual Utility operating company to allocate the energy associated with such opportunity sales as part of its load but provides a different allocation authority.  The FERC further found that the after-the-fact accounting methodology used to allocate the energy used to supply the sales was inconsistent with the System Agreement.  The FERC in its decision established further hearing procedures to quantify the effect of repricing the opportunity sales in accordance with the FERC’s June 2012 decision. The hearing was held in May 2013 and the ALJ issued an initial decision in August 2013. The LPSC, the APSC, the City Council, and FERC staff filed briefs on exceptions and/or briefs opposing exceptions. Entergy filed a brief on exceptions requesting that the FERC reverse the initial decision and a brief opposing certain exceptions taken by the LPSC and FERC staff.

In April 2016 the FERC issued orders addressing requests for rehearing filed in July 2012 and the ALJ’s August 2013 initial decision. The first order denied Entergy’s request for rehearing and affirmed the FERC’s earlier rulings that Entergy’s original methodology for allocating energy costs to the opportunity sales was incorrect and, as a result, Entergy Arkansas must make payments to the other Utility operating companies to put them in the same position that they would have been in absent the incorrect allocation. The FERC clarified that interest should be included with the payments. The second order affirmed in part, and reversed in part, the rulings in the ALJ’s August 2013 initial decision regarding the methodology that should be used to calculate the payments Entergy Arkansas is to make to the other Utility operating companies. The FERC affirmed the ALJ’s ruling that a full re-run of intra-system bills should be performed but required that methodology be modified so that the sales have the same priority for purposes of energy allocation as joint account sales. The FERC reversed the ALJ’s decision that any payments by Entergy Arkansas should be reduced by 20%. The FERC also reversed the ALJ’s decision that adjustments to other System Agreement service schedules and excess bandwidth payments should not be taken into account when calculating the payments to be made by Entergy Arkansas. The FERC held that such adjustments and excess bandwidth payments should be taken into account but ordered further proceedings before an ALJ to address whether a cap on any reduction due to bandwidth payments was necessary and to implement the other adjustments to the calculation methodology.

In May 2016, Entergy Services filed a request for rehearing of the FERC’s April 2016 order arguing that payments made by Entergy Arkansas should be reduced as a result of the timing of the LPSC’s approval of certain contracts. Entergy Services also filed a request for clarification and/or rehearing of the FERC’s April 2016 order addressing the ALJ’s August 2013 initial decision. The APSC and the LPSC also filed requests for rehearing of the FERC’s April 2016 order. In September 2017 the FERC issued an order denying the request for rehearing on the issue of whether any payments by Entergy Arkansas to the other Utility operating companies should be reduced due to the timing of the LPSC’s approval of Entergy Arkansas’s wholesale baseload contract with Entergy Louisiana. In November 2017 the FERC issued an order denying all of the remaining requests for rehearing of the April 2016 order. In November 2017, Entergy Services filed a petition for review in the D.C. Circuit of the FERC’s orders in the first two phases of the opportunity sales case. In December 2017 the D.C. Circuit granted Entergy Services’ request to hold the appeal in abeyance pending final resolution of the related proceeding before the FERC. In January 2018 the APSC and the LPSC filed separate petitions for review in the D.C. Circuit, and the D.C. Circuit consolidated the appeals with Entergy Services’ appeal.

The hearing required by the FERC’s April 2016 order was held in May 2017. In July 2017 the ALJ issued an initial decision addressing whether a cap on any reduction due to bandwidth payments was necessary and whether to implement the other adjustments to the calculation methodology. In August 2017 the Utility operating companies, the LPSC, the APSC, and FERC staff filed individual briefs on exceptions challenging various aspects of the initial decision. In September 2017 the Utility operating companies, the LPSC, the APSC, the MPSC, the City Council, and FERC staff filed separate briefs opposing exceptions taken by various parties.
Based on testimony previously submitted in the case and its assessment of the April 2016 FERC orders, in the first quarter 2016, Entergy Arkansas recorded a liability of $87 million, which included interest, for its estimated increased costs and payment to the other Utility operating companies, and a deferred fuel regulatory asset of $75 million. Following its assessment of the course of the proceedings, including the FERC’s denial of rehearing in November 2017 described above, in the fourth quarter 2017, Entergy Arkansas recorded an additional liability of $35 million and a regulatory asset of $31 million.

In October 2018 the FERC issued an order addressing the ALJ’s July 2017 initial decision. The FERC reversed the ALJ’s decision to cap the reduction in Entergy Arkansas’s payment to account for the increased bandwidth payments that Entergy Arkansas made to the other operating companies. The FERC also reversed the ALJ’s decision that Grand Gulf sales from January through September 2000 should be included in the calculation of Entergy Arkansas’s payment. The FERC affirmed on other grounds the ALJ’s rejection of the LPSC’s claim that certain joint account sales should be accounted for as part of the calculation of Entergy Arkansas’s payment. In November 2018 the LPSC requested rehearing of the FERC’s October 2018 decision. In December 2019 the FERC denied the LPSC’s request for rehearing. In January 2020 the LPSC appealed the December 2019 decision to the D.C. Circuit.

In December 2018, Entergy made a compliance filing in response to the FERC’s October 2018 order. The compliance filing provided a final calculation of Entergy Arkansas’s payments to the other Utility operating companies, including interest. No protests were filed in response to the December 2018 compliance filing. The December 2018 compliance filing is pending FERC action. Refunds and interest in the following amounts were paid by Entergy Arkansas to the other operating companies in December 2018:

 Total refunds including interest
Payment/(Receipt)
 (In Millions)
PrincipalInterestTotal
Entergy Arkansas$68$67$135
Entergy Louisiana($30)($29)($59)
Entergy Mississippi($18)($18)($36)
Entergy New Orleans($3)($4)($7)
Entergy Texas($17)($16)($33)

Entergy Arkansas previously recognized a regulatory asset with a balance of $116 million as of December 31, 2018 for a portion of the payments due as a result of this proceeding.

As described above, the FERC’s opportunity sales orders have been appealed to the D.C. Circuit. In February 2020 all of the appeals were consolidated and in April 2020 the D.C. Circuit established a briefing schedule. Briefing was completed in September 2020 and oral argument was heard in December 2020. In July 2021 the D.C. Circuit issued a decision denying all of the petitions for review filed in response to the FERC’s opportunity sales orders.

In February 2019 the LPSC filed a new complaint relating to two issues that were raised in the opportunity sales proceeding, but that, in its October 2018 order, the FERC held were outside the scope of the proceeding. In March 2019, Entergy Services filed an answer and motion to dismiss the new complaint. In November 2019 the FERC issued an order denying the LPSC’s complaint. The order concluded that the settlement agreement approved by the FERC in December 2015 terminating the System Agreement barred the LPSC’s new complaint. In December 2019 the LPSC requested rehearing of the FERC’s November 2019 order, and in July 2020 the FERC issued an order dismissing the LPSC’s request for rehearing. In September 2020 the LPSC appealed to the D.C. Circuit the FERC’s orders dismissing the new opportunity sales complaint. In November 2020 the D.C. Circuit
issued an order establishing that briefing will occur in January 2021 through April 2021. Oral argument was held in September 2021. In December 2021 the D.C. Circuit denied the LPSC’s Petition for Review of the new opportunity sales complaint. The opportunity sales cases are complete at FERC and at the D.C. Circuit and no additional refund amounts are owed by Entergy Arkansas.

In May 2019, Entergy Arkansas filed an application and supporting testimony with the APSC requesting approval of a special rider tariff to recover the costs of these payments from its retail customers over a 24-month period.  The application requested that the APSC approve the rider to take effect within 30 days or, if suspended by the APSC as allowed by commission rule, approve the rider to take effect in the first billing cycle of the first month occurring 30 days after issuance of the APSC’s order approving the rider. In June 2019 the APSC suspended Entergy Arkansas’s tariff and granted Entergy Arkansas’s motion asking the APSC to establish the proceeding as the single designated proceeding in which interested parties may assert claims related to the appropriate retail rate treatment of the FERC’s October 2018 order and related FERC orders in the opportunity sales proceeding. In January 2020 the APSC adopted a procedural schedule with a hearing in April 2020. In January 2020 the Attorney General and Arkansas Electric Energy Consumers, Inc. filed a joint motion seeking to dismiss Entergy Arkansas’s application alleging that the APSC, in a prior proceeding, ruled on the issues addressed in the application and determined that Entergy Arkansas’s requested relief violates the filed rate doctrine and the prohibition against retroactive ratemaking. Entergy Arkansas responded to the joint motion in February 2020 rebutting these arguments, including demonstrating that the claims in this proceeding differ substantially from those the APSC addressed previously and that the payment resulting from a FERC tariff violation for which Entergy Arkansas seeks retail cost recovery in this proceeding differs materially from the refunds resulting from a FERC tariff amendment that the APSC previously rejected on filed rate doctrine and the retroactive ratemaking grounds. In addition, in January 2020 the Attorney General and Arkansas Electric Energy Consumers, Inc. filed testimony opposing the recovery by Entergy Arkansas of the opportunity sales payment but also claiming that certain components of the payment should be segregated and refunded to customers. In March 2020, Entergy Arkansas filed rebuttal testimony.

In July 2020 the APSC issued a decision finding that Entergy Arkansas’s application is not in the public interest. The order also directed Entergy Arkansas to refund to its retail customers within 30 days of the order the FERC-determined over-collection of $13.7 million, plus interest, associated with a recalculated bandwidth remedy. In addition to these primary findings, the order also denied the Attorney General’s request for Entergy Arkansas to prepare a compliance filing detailing all of the retail impacts from the opportunity sales and denied a request by the Arkansas Electric Energy Consumers to recalculate all costs using the revised responsibility ratio. Entergy Arkansas filed a motion for temporary stay of the 30-day requirement to allow Entergy Arkansas a reasonable opportunity to seek rehearing of the APSC order, but in July 2020 the APSC denied Entergy Arkansas’s request for a stay and directed Entergy Arkansas to refund to its retail customers the component of the total FERC-determined opportunity sales payment that was associated with increased bandwidth remedy payments of $13.7 million, plus interest. The refunds were issued in the August 2020 billing cycle. While the APSC denied Entergy Arkansas’s stay request, Entergy Arkansas believes its actions were prudent and, therefore, the costs, including the $13.7 million, plus interest, are recoverable. In July 2020, Entergy Arkansas requested rehearing of the APSC order, which rehearing was denied by the APSC in August 2020. In September 2020, Entergy Arkansas filed a complaint in the U.S. District Court for the Eastern District of Arkansas challenging the APSC’s order denying Entergy Arkansas’s request to recover the costs of these payments. In October 2020 the APSC filed a motion to dismiss Entergy Arkansas’s complaint, to which Entergy Arkansas responded. Also in December 2020, Entergy Arkansas and the APSC held a pre-trial conference, and filed a report with the court in January 2021. The court held a hearing in February 2021 regarding issues addressed in the pre-trial conference report, and in June 2021 the court stayed all discovery until it rules on pending motions, after which the court will issue an amended schedule if necessary.
Complaints Against System Energy

System Energy’s operating revenues are derived from the allocation of the capacity, energy, and related costs associated with its 90% ownership/leasehold interest in Grand Gulf.  System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans pursuant to the Unit Power Sales Agreement. System Energy and the Unit Power Sales Agreement are currently the subject of several litigation proceedings at the FERC, including challenges with respect to System Energy’s authorized return on equity and capital structure, renewal of its sale-leaseback arrangement, treatment of uncertain tax positions, a broader investigation of rates under the Unit Power Sales Agreement, and a prudence complaint challenging the extended power uprate completed at Grand Gulf in 2012 and the operation and management of Grand Gulf, particularly in the 2016-2020 time period. The claims in these proceedings include claims for refunds and claims for rate adjustments; the aggregate amount of refunds claimed in these proceedings substantially exceeds the net book value of System Energy. Following are discussions of the proceedings.

Return on Equity and Capital Structure Complaints

In January 2017 the APSC and MPSC filed a complaint with the FERC against System Energy. The complaint seeks a reduction in the return on equity component of the Unit Power Sales Agreement pursuant to which System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. Entergy Arkansas also sells some of its Grand Gulf capacity and energy to Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under separate agreements. The current return on equity under the Unit Power Sales Agreement is 10.94%, which was established in a rate proceeding that became final in July 2001.

The APSC and MPSC complaint alleges that the return on equity is unjust and unreasonable because capital market and other considerations indicate that it is excessive. The complaint requests proceedings to investigate the return on equity and establish a lower return on equity, and also requests that the FERC establish January 23, 2017 as a refund effective date. The complaint includes return on equity analysis that purports to establish that the range of reasonable return on equity for System Energy is between 8.37% and 8.67%. System Energy answered the complaint in February 2017 and disputes that a return on equity of 8.37% to 8.67% is just and reasonable. The LPSC and the City Council intervened in the proceeding expressing support for the complaint. In September 2017 the FERC established a refund effective date of January 23, 2017 and directed the parties to engage in settlement proceedings before an ALJ. The parties were unable to settle the return on equity issue and a FERC hearing judge was assigned in July 2018. The 15-month refund period in connection with the APSC/MPSC complaint expired on April 23, 2018.

In April 2018 the LPSC filed a complaint with the FERC against System Energy seeking an additional 15-month refund period.  The LPSC complaint requests similar relief from the FERC with respect to System Energy’s return on equity and also requests the FERC to investigate System Energy’s capital structure.  The APSC, MPSC, and City Council intervened in the proceeding, filed an answer expressing support for the complaint, and asked the FERC to consolidate this proceeding with the proceeding initiated by the complaint of the APSC and MPSC in January 2017. System Energy answered the LPSC complaint in May 2018 and also filed a motion to dismiss the complaint. In August 2018 the FERC issued an order dismissing the LPSC’s request to investigate System Energy’s capital structure and setting for hearing the return on equity complaint, with a refund effective date of April 27, 2018. The 15-month refund period in connection with the LPSC return on equity complaint expired on July 26, 2019.

The portion of the LPSC’s complaint dealing with return on equity was subsequently consolidated with the APSC and MPSC complaint for hearing. The parties addressed an order (issued in a separate FERC proceeding involving New England transmission owners) that proposed modifying the FERC’s standard methodology for determining return on equity. In September 2018, System Energy filed a request for rehearing and the LPSC filed a request for rehearing or reconsideration of the FERC’s August 2018 order. The LPSC’s request referenced an
amended complaint that it filed on the same day raising the same capital structure claim the FERC had earlier dismissed. The FERC initiated a new proceeding for the amended capital structure complaint, and System Energy submitted a response in October 2018. In January 2019 the FERC set the amended complaint for settlement and hearing proceedings. Settlement proceedings in the capital structure proceeding commenced in February 2019. As noted below, in June 2019 settlement discussions were terminated and the amended capital structure complaint was consolidated with the ongoing return on equity proceeding. The 15-month refund period in connection with the capital structure complaint was from September 24, 2018 to December 23, 2019.

In January 2019 the LPSC and the APSC and MPSC filed direct testimony in the return on equity proceeding. For the refund period January 23, 2017 through April 23, 2018, the LPSC argues for an authorized return on equity for System Energy of 7.81% and the APSC and MPSC argue for an authorized return on equity for System Energy of 8.24%. For the refund period April 27, 2018 through July 27, 2019, and for application on a prospective basis, the LPSC argues for an authorized return on equity for System Energy of 7.97% and the APSC and MPSC argue for an authorized return on equity for System Energy of 8.41%. In March 2019, System Energy submitted answering testimony. For the first refund period, System Energy’s testimony argues for a return on equity of 10.10% (median) or 10.70% (midpoint). For the second refund period, System Energy’s testimony shows that the calculated returns on equity for the first period fall within the range of presumptively just and reasonable returns on equity, and thus the second complaint should be dismissed (and the first period return on equity used going forward). If the FERC nonetheless were to set a new return on equity for the second period (and going forward), System Energy argues the return on equity should be either 10.32% (median) or 10.69% (midpoint).

In May 2019 the FERC trial staff filed its direct and answering testimony in the return on equity proceeding. For the first refund period, the FERC trial staff calculates an authorized return on equity for System Energy of 9.89% based on the application of FERC’s proposed methodology. The FERC trial staff’s direct and answering testimony noted that an authorized return on equity of 9.89% for the first refund period was within the range of presumptively just and reasonable returns on equity for the second refund period, as calculated using a study period ending January 31, 2019 for the second refund period.

In June 2019, System Energy filed testimony responding to the testimony filed by the FERC trial staff. Among other things, System Energy’s testimony rebutted arguments raised by the FERC trial staff and provided updated calculations for the second refund period based on the study period ending May 31, 2019. For that refund period, System Energy’s testimony shows that strict application of the return on equity methodology proposed by the FERC staff indicates that the second complaint would not be dismissed, and the new return on equity would be set at 9.65% (median) or 9.74% (midpoint). System Energy’s testimony argues that these results are insufficient in light of benchmarks such as state returns on equity and treasury bond yields, and instead proposes that the calculated returns on equity for the second period should be either 9.91% (median) or 10.3% (midpoint). System Energy’s testimony also argues that, under application of its proposed modified methodology, the 10.10% return on equity calculated for the first refund period would fall within the range of presumptively just and reasonable returns on equity for the second refund period.

Also in June 2019, the FERC’s Chief ALJ issued an order terminating settlement discussions in the amended complaint addressing System Energy’s capital structure. The ALJ consolidated the amended capital structure complaint with the ongoing return on equity proceeding and set new procedural deadlines for the consolidated hearing.

In August 2019 the LPSC and the APSC and MPSC filed rebuttal testimony in the return on equity proceeding and direct and answering testimony relating to System Energy’s capital structure. The LPSC re-argues for an authorized return on equity for System Energy of 7.81% for the first refund period and 7.97% for the second refund period. The APSC and MPSC argue for an authorized return on equity for System Energy of 8.26% for the first refund period and 8.32% for the second refund period. With respect to capital structure, the LPSC proposes that the FERC establish a hypothetical capital structure for System Energy for ratemaking purposes. Specifically, the LPSC proposes that System Energy’s common equity ratio be set to Entergy Corporation’s equity ratio of 37%
equity and 63% debt. In the alternative, the LPSC argues that the equity ratio should be no higher than 49%, the composite equity ratio of System Energy and the other Entergy operating companies who purchase under the Unit Power Sales Agreement. The APSC and MPSC recommend that 35.98% be set as the common equity ratio for System Energy. As an alternative, the APSC and MPSC propose that System Energy’s common equity be set at 46.75% based on the median equity ratio of the proxy group for setting the return on equity.

In September 2019 the FERC trial staff filed its rebuttal testimony in the return on equity proceeding. For the first refund period, the FERC trial staff calculates an authorized return on equity for System Energy of 9.40% based on the application of the FERC’s proposed methodology and an updated proxy group. For the second refund period, based on the study period ending May 31, 2019, the FERC trial staff rebuttal testimony argues for a return on equity of 9.63%. In September 2019 the FERC trial staff also filed direct and answering testimony relating to System Energy’s capital structure. The FERC trial staff argues that the average capital structure of the proxy group used to develop System Energy’s return on equity should be used to establish the capital structure. Using this approach, the FERC trial staff calculates the average capital structure for its proposed proxy group of 46.74% common equity, and 53.26% debt.

In October 2019, System Energy filed answering testimony disputing the FERC trial staff’s, the LPSC’s, and the APSC’s and MPSC’s arguments for the use of a hypothetical capital structure and arguing that the use of System Energy’s actual capital structure is just and reasonable.

In November 2019, in a proceeding that did not involve System Energy, the FERC issued an order addressing the methodology for determining the return on equity applicable to transmission owners in MISO. Thereafter, the procedural schedule in the System Energy proceeding was amended to allow the participants to file supplemental testimony addressing the order in the MISO transmission owner proceeding (Opinion No. 569).

In February 2020 the LPSC, the MPSC and APSC, and the FERC trial staff filed supplemental testimony addressing Opinion No. 569 and how it would affect the return on equity evaluation for the two complaint periods concerning System Energy. For the first refund period, based on their respective interpretations and applications of the Opinion No. 569 methodology, the LPSC argues for an authorized return on equity for System Energy of 8.44%; the MPSC and APSC argue for an authorized return on equity of 8.41%; and the FERC trial staff argues for an authorized return on equity of 9.22%. For the second refund period and on a prospective basis, based on their respective interpretations and applications of the Opinion No. 569 methodology, the LPSC argues for an authorized return on equity for System Energy of 7.89%; the MPSC and APSC argue that an authorized return on equity of 8.01% may be appropriate; and the FERC trial staff argues for an authorized return on equity of 8.66%.

In April 2020, System Energy filed supplemental answering testimony addressing Opinion No. 569. System Energy argues that the Opinion No. 569 methodology is conceptually and analytically defective for purposes of establishing just and reasonable authorized return on equity determinations and proposes an alternative approach. As its primary recommendation, System Energy continues to support the return on equity determinations in its March 2019 testimony for the first refund period and its June 2019 testimony for the second refund period. Under the Opinion No. 569 methodology, System Energy calculates a “presumptively just and reasonable range” for the authorized return on equity for the first refund period of 8.57% to 9.52%, and for the second refund period of 8.28% to 9.11%. System Energy argues that these ranges are not just and reasonable results. Under its proposed alternative methodology, System Energy calculates an authorized return on equity of 10.26% for the first refund period, which also falls within the presumptively just and reasonable range calculated for the second refund period and prospectively.

In May 2020 the FERC issued an order on rehearing of Opinion No. 569 (Opinion No. 569-A). In June 2020 the procedural schedule in the System Energy proceeding was further revised in order to allow parties to address the Opinion No. 569-A methodology. Pursuant to the revised schedule, in June 2020, the LPSC, MPSC and APSC, and the FERC trial staff filed supplemental testimony addressing Opinion No. 569-A and how it would affect the return on equity evaluation for the two complaint periods concerning System Energy. For the first refund
period, based on their respective interpretations and applications of the Opinion No. 569-A methodology, the LPSC argues for an authorized return on equity for System Energy of 7.97%; the MPSC and APSC argue for an authorized return on equity of 9.24%; and the FERC trial staff argues for an authorized return on equity of 9.49%. For the second refund period and on a prospective basis, based on their respective interpretations and applications of the Opinion No. 569-A methodology, the LPSC argues for an authorized return on equity for System Energy of 7.78%; the MPSC and APSC argue that an authorized return on equity of 9.15% may be appropriate if the second complaint is not dismissed; and the FERC trial staff argues for an authorized return on equity of 9.09% if the second complaint is not dismissed.

Pursuant to the revised procedural schedule, in July 2020, System Energy filed supplemental testimony addressing Opinion No. 569-A. System Energy argues that strict application of the Opinion No. 569-A methodology produces results inconsistent with investor requirements and does not provide a sound basis on which to evaluate System Energy’s authorized return on equity. As its primary recommendation, System Energy argues for the use of a methodology that incorporates four separate financial models, including the constant growth form of the discounted cash flow model and the empirical capital asset pricing model. Based on application of its recommended methodology, System Energy argues for an authorized return on equity of 10.12% for the first refund period, which also falls within the presumptively just and reasonable range calculated for the second refund period and prospectively. Under the Opinion No. 569-A methodology, System Energy calculates an authorized return on equity of 9.44% for the first refund period, which also falls within the presumptively just and reasonable range calculated for the second refund period and prospectively.

The parties and FERC trial staff filed final rounds of testimony in August 2020. The hearing before a FERC ALJ occurred in late-September through early-October 2020, post-hearing briefing took place in November and December 2020.

In March 2021 the FERC ALJ issued an initial decision. With regard to System Energy’s authorized return on equity, the ALJ determined that the existing return on equity of 10.94% is no longer just and reasonable, and that the replacement authorized return on equity, based on application of the Opinion No. 569-A methodology, should be 9.32%. The ALJ further determined that System Energy should pay refunds for a fifteen-month refund period (January 2017-April 2018) based on the difference between the current return on equity and the replacement authorized return on equity. The ALJ determined that the April 2018 complaint concerning the authorized return on equity should be dismissed, and that no refunds for a second fifteen-month refund period should be due. With regard to System Energy’s capital structure, the ALJ determined that System Energy’s actual equity ratio is excessive and that the just and reasonable equity ratio is 48.15% equity, based on the average equity ratio of the proxy group used to evaluate the return on equity for the second complaint. The ALJ further determined that System Energy should pay refunds for a fifteen-month refund period (September 2018-December 2019) based on the difference between the actual equity ratio and the 48.15% equity ratio. If the ALJ’s initial decision is upheld, the estimated refund for this proceeding is approximately $60 million, which includes interest through December 31, 2021, and the estimated resulting annual rate reduction would be approximately $45 million. The estimated refund will continue to accrue interest until a final FERC decision is issued. Based on the course of the proceeding to date, System Energy has recorded a provision of $37 million, including interest, as of December 31, 2021.

The ALJ initial decision is an interim step in the FERC litigation process, and an ALJ’s determinations made in an initial decision are not controlling on the FERC. In April 2021, System Energy filed its brief on exceptions, in which it challenged the initial decision’s findings on both the return on equity and capital structure issues. Also in April 2021 the LPSC, APSC, MPSC, City Council, and the FERC trial staff filed briefs on exceptions. Reply briefs opposing exceptions were filed in May 2021 by System Energy, the FERC trial staff, the LPSC, APSC, MPSC, and the City Council. Refunds, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.
Grand Gulf Sale-leaseback Renewal Complaint and Uncertain Tax Position Rate Base Issue

In May 2018 the LPSC filed a complaint against System Energy and Entergy Services related to System Energy’s renewal of a sale-leaseback transaction originally entered into in December 1988 for an 11.5% undivided interest in Grand Gulf Unit 1. The complaint alleges that System Energy violated the filed rate and the FERC’s ratemaking and accounting requirements when it included in Unit Power Sales Agreement billings the cost of capital additions associated with the sale-leaseback interest, and that System Energy is double-recovering costs by including both the lease payments and the capital additions in Unit Power Sales Agreement billings. The complaint also claims that System Energy was imprudent in entering into the sale-leaseback renewal because the Utility operating companies that purchase Grand Gulf’s output from System Energy could have obtained cheaper capacity and energy in the MISO markets. The complaint further alleges that System Energy violated various other reporting and accounting requirements and should have sought prior FERC approval of the lease renewal. The complaint seeks various forms of relief from the FERC. The complaint seeks refunds for capital addition costs for all years in which they were recorded in allegedly non-formula accounts or, alternatively, the disallowance of the return on equity for the capital additions in those years plus interest. The complaint also asks that the FERC disallow and refund the lease costs of the sale-leaseback renewal on grounds of imprudence, investigate System Energy’s treatment of a DOE litigation payment, and impose certain forward-looking procedural protections, including audit rights for retail regulators of the Unit Power Sales Agreement formula rates. The APSC, MPSC, and City Council intervened in the proceeding.

In June 2018, System Energy and Entergy Services filed a motion to dismiss and an answer to the LPSC complaint denying that System Energy’s treatment of the sale-leaseback renewal and capital additions violated the terms of the filed rate or any other FERC ratemaking, accounting, or legal requirements or otherwise constituted double recovery. The response also argued that the complaint is inconsistent with a FERC-approved settlement to which the LPSC is a party and that explicitly authorizes System Energy to recover its lease payments. Finally, the response argued that both the capital additions and the sale-leaseback renewal were prudent investments and the LPSC complaint fails to justify any disallowance or refunds. The response also offered to submit formula rate protocols for the Unit Power Sales Agreement similar to the procedures used for reviewing transmission rates under the MISO tariff. In September 2018 the FERC issued an order setting the complaint for hearing and settlement proceedings. The FERC established a refund effective date of May 18, 2018.

In February 2019 the presiding ALJ ruled that the hearing ordered by the FERC includes the issue of whether specific subcategories of accumulated deferred income tax should be included in, or excluded from, System Energy’s formula rate. In March 2019 the LPSC, MPSC, APSC and City Council filed direct testimony. The LPSC testimony sought refunds that include the renewal lease payments (approximately $17.2 million per year since July 2015), rate base reductions for accumulated deferred income tax associated with uncertain tax positions, and the cost of capital additions associated with the sale-leaseback interest, as well as interest on those amounts.

In June 2019 System Energy filed answering testimony arguing that the FERC should reject all claims for refunds.  Among other things, System Energy argued that claims for refunds of the costs of lease renewal payments and capital additions should be rejected because those costs were recovered consistent with the Unit Power Sales Agreement formula rate, System Energy was not over or double recovering any costs, and ratepayers will save costs over the initial and renewal terms of the leases.  System Energy argued that claims for refunds associated with liabilities arising from uncertain tax positions should be rejected because the liabilities do not provide cost-free capital, the repayment timing of the liabilities is uncertain, and the outcome of the underlying tax positions is uncertain.  System Energy’s testimony also challenged the refund calculations supplied by the other parties.

In August 2019 the FERC trial staff filed direct and answering testimony seeking refunds for rate base reductions for liabilities associated with uncertain tax positions. The FERC trial staff also argued that System Energy recovered $32 million more than it should have in depreciation expense for capital additions. In September 2019, System Energy filed cross-answering testimony disputing the FERC trial staff’s arguments for refunds, stating that the FERC trial staff’s position regarding depreciation rates for capital additions is not unreasonable, but
explaining that any change in depreciation expense is only one element of a Unit Power Sales Agreement re-billing calculation. Adjustments to depreciation expense in any re-billing under the Unit Power Sales Agreement formula rate will also involve changes to accumulated depreciation, accumulated deferred income taxes, and other formula elements as needed. In October 2019 the LPSC filed rebuttal testimony increasing the amount of refunds sought for liabilities associated with uncertain tax positions.  The LPSC seeks approximately $512 million plus interest, which is approximately $216 million through December 31, 2021.  The FERC trial staff also filed rebuttal testimony in which it seeks refunds of a similar amount as the LPSC for the liabilities associated with uncertain tax positions.  The LPSC testimony also argued that adjustments to depreciation rates should affect rate base on a prospective basis only.

A hearing was held before a FERC ALJ in November 2019. In April 2020 the ALJ issued the initial decision. Among other things, the ALJ determined that refunds were due on three main issues. First, with regard to the lease renewal payments, the ALJ determined that System Energy is recovering an unjust acquisition premium through the lease renewal payments, and that System Energy’s recovery from customers through rates should be limited to the cost of service based on the remaining net book value of the leased assets, which is approximately $70 million. The ALJ found that the remedy for this issue should be the refund of lease payments (approximately $17.2 million per year since July 2015) with interest determined at the FERC quarterly interest rate, which would be offset by the addition of the net book value of the leased assets in the cost of service. The ALJ did not calculate a value for the refund expected as a result of this remedy. In addition, System Energy would no longer recover the lease payments in rates prospectively. Second, with regard to the liabilities associated with uncertain tax positions, the ALJ determined that the liabilities are accumulated deferred income taxes and that System Energy’s rate base should have been reduced for those liabilities. If the ALJ’s initial decision is upheld, the estimated refund for this issue through December 31, 2021, is approximately $422 million, plus interest, which is approximately $128 million through December 31, 2021. The ALJ also found that System Energy should include liabilities associated with uncertain tax positions as a rate base reduction going forward. Third, with regard to the depreciation expense adjustments, the ALJ found that System Energy should correct for the error in re-billings retroactively and prospectively, but that System Energy should not be permitted to recover interest on any retroactive return on enhanced rate base resulting from such corrections. If the initial decision is affirmed on this issue, System Energy estimates refunds of approximately $19 million, which includes interest through December 31, 2021.

The ALJ initial decision is an interim step in the FERC litigation process, and an ALJ’s determinations made in an initial decision are not controlling on the FERC. The ALJ in the initial decision acknowledges that these are issues of first impression before the FERC. In June 2020, System Energy, the LPSC, and the FERC trial staff filed briefs on exceptions, challenging several of the initial decision’s findings. System Energy’s brief on exceptions challenged the initial decision’s limitations on recovery of the lease renewal payments, its proposed rate base refund for the liabilities associated with uncertain tax positions, and its proposal to asymmetrically treat interest on bill corrections for depreciation expense adjustments. The LPSC’s and the FERC trial staff’s briefs on exceptions each challenged the initial decision’s allowance for recovery of the cost of service associated with the lease renewal based on the remaining net book value of the leased assets, its calculation of the remaining net book value of the leased assets, and the amount of the initial decision’s proposed rate base refund for the liabilities associated with uncertain tax positions. The LPSC’s brief on exceptions also challenged the initial decision’s proposal that depreciation expense adjustments include retroactive adjustments to rate base and its finding that section 203 of the Federal Power Act did not apply to the lease renewal. The FERC trial staff’s brief on exceptions also challenged the initial decision’s finding that the FERC need not institute a formal investigation into System Energy’s tariff. In October 2020, System Energy, the LPSC, the MPSC, the APSC, and the City Council filed briefs opposing exceptions. System Energy opposed the exceptions filed by the LPSC and the FERC trial staff. The LPSC, MPSC, APSC, City Council, and the FERC trial staff opposed the exceptions filed by System Energy. Also in October 2020 the MPSC, APSC, and the City Council filed briefs adopting the exceptions of the LPSC and the FERC trial staff. The case is pending before the FERC, which will review the case and issue an order on the proceeding, and the FERC may accept, reject, or modify the ALJ’s initial decision in whole or in part. Refunds, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.
In addition, in September 2020, the IRS issued a Notice of Proposed Adjustment (NOPA) and Entergy executed it. The NOPA memorializes the IRS’s decision to adjust the 2015 consolidated federal income tax return of Entergy Corporation and certain of its subsidiaries, including System Energy, with regard to the uncertain decommissioning tax position. Pursuant to the audit resolution documented in the NOPA, the IRS allowed System Energy’s inclusion of $102 million of future nuclear decommissioning costs in System Energy’s cost of goods sold for the 2015 tax year, roughly 10% of the requested deduction, but disallowed the balance of the position. In September 2020, System Energy filed a motion to lodge the NOPA into the record in the FERC proceeding. In October 2020 the LPSC, the APSC, the MPSC, the City Council, and the FERC trial staff filed oppositions to System Energy’s motion. As a result of the NOPA issued by the IRS in September 2020, System Energy filed, in October 2020, a new Federal Power Act section 205 filing at FERC to establish an ongoing rate base credit for the accumulated deferred income taxes resulting from the decommissioning uncertain tax position. On a prospective basis beginning with the October 2020 bill, System Energy proposes to include the accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position as a credit to rate base under the Unit Power Sales Agreement. In November 2020 the LPSC, APSC, MPSC, and City Council filed a protest to the filing, and System Energy responded.

In November 2020 the IRS issued a Revenue Agent’s Report (RAR) for the 2014/2015 tax year and in December 2020 Entergy executed it. The RAR contained the same adjustment to the uncertain nuclear decommissioning tax position as that which the IRS had announced in the NOPA. In December 2020, System Energy filed a motion to lodge the RAR into the record in the FERC proceeding addressing the uncertain tax position rate base issue. In January 2021 the LPSC, APSC, MPSC, and City Council filed a protest to the motion.

As a result of the RAR, in December 2020, System Energy filed amendments to its new Federal Power Act section 205 filings to establish an ongoing rate base credit for the accumulated deferred income taxes resulting from the decommissioning uncertain tax position and to credit excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position. The amendments both propose the inclusion of the RAR as support for the filings. In December 2020 the LPSC, APSC, and City Council filed a protest in response to the amendments, reiterating their prior objections to the filings. In February 2021 the FERC issued an order accepting System Energy’s Federal Power Act section 205 filings subject to refund, setting them for hearing, and holding the hearing in abeyance.

In December 2020, System Energy filed a new Federal Power Act section 205 filing to provide a one-time, historical credit of $25.2 million for the accumulated deferred income taxes that would have been created by the decommissioning uncertain tax position if the IRS’s decision had been known in 2016. In January 2021 the LPSC, APSC, MPSC, and City Council filed a protest to the filing. In February 2021 the FERC issued an order accepting System Energy’s Federal Power Act section 205 filing subject to refund, setting it for hearing, and holding the hearing in abeyance. The one-time credit was made during the first quarter 2021.

LPSC Authorization of Additional Complaints

In May 2020 the LPSC authorized its staff to file additional complaints at the FERC related to the rates charged by System Energy for Grand Gulf energy and capacity supplied to Entergy Louisiana under the Unit Power Sales Agreement. The LPSC directive notes that the initial decision issued by the presiding ALJ in the Grand Gulf sale-leaseback complaint proceeding did not address, for procedural reasons, certain rate issues raised by the LPSC and declined to order further investigation of rates charged by System Energy. The LPSC directive authorizes its staff to file complaints at the FERC “necessary to address these rate issues, to request a full investigation into the rates charged by System Energy for Grand Gulf power, and to seek rate refund, rate reduction, and such other remedies as may be necessary and appropriate to protect Louisiana ratepayers.” The LPSC directive further stated that the LPSC has seen “information suggesting that the Grand Gulf plant has been significantly underperforming compared to other nuclear plants in the United States, has had several extended and unexplained outages, and has been plagued with serious safety concerns.” The LPSC expressed concern that the costs paid by Entergy
Louisiana's retail customers may have been detrimentally impacted, and authorized “the filing of a FERC complaint to address these performance issues and to seek appropriate refund, rate reduction, and other remedies as may be appropriate.”

Unit Power Sales Agreement Complaint

The first of the additional complaints was filed by the LPSC, the APSC, the MPSC, and the City Council in September 2020. The complaint raises two sets of rate allegations: violations of the filed rate and a corresponding request for refunds for prior periods; and elements of the Unit Power Sales Agreement are unjust and unreasonable and a corresponding request for refunds for the 15-month refund period and changes to the Unit Power Sales Agreement prospectively. Several of the filed rate allegations overlap with the previous complaints. The filed rate allegations not previously raised are that System Energy: failed to provide a rate base credit to customers for the “time value” of sale-leaseback lease payments collected from customers in advance of the time those payments were due to the owner-lessors; improperly included certain lease refinancing costs in rate base as prepayments; improperly included nuclear decommissioning outage costs in rate base; failed to include categories of accumulated deferred income taxes as a reduction to rate base; charged customers based on a higher equity ratio than would be appropriate due to excessive retained earnings; and did not correctly reflect money pool investments and imprudently invested cash into the money pool. The elements of the Unit Power Sales Agreement that the complaint alleges are unjust and unreasonable include: incentive and executive compensation, lack of an equity re-opener, lobbying, and private airplane travel. The complaint also requests a rate investigation into the Unit Power Sales Agreement and System Energy’s billing practices pursuant to section 206 of the Federal Power Act, including any issue relevant to the Unit Power Sales Agreement and its inputs. System Energy filed its answer opposing the complaint in November 2020. In its answer, System Energy argued that all of the claims raised in the complaint should be dismissed and agreed that bill adjustment with respect to two discrete issues were justified. System Energy argued that dismissal is warranted because all claims fall into one or more of the following categories: the claims have been raised and are being litigated in another proceeding; the claims do not present a prima facie case and do not satisfy the threshold burden to establish a complaint proceeding; the claims are premised on a theory or request relief that is incompatible with federal law or FERC policy; the claims request relief that is inconsistent with the filed rate; the claims are barred or waived by the legal doctrine of laches; and/or the claims have been fully addressed and do not warrant further litigation. In December 2020, System Energy filed a bill adjustment report indicating that $3.4 million had been credited to customers in connection with the two discrete issues concerning the inclusion of certain accumulated deferred income taxes balances in rates. In January 2021 the complainants filed a response to System Energy’s November 2020 answer, and in February 2021, System Energy filed a response to the complainant’s response.

In May 2021 the FERC issued an order addressing the complaint, establishing a refund effective date of September 21, 2020, establishing hearing procedures, and holding those procedures in abeyance pending FERC’s review of the initial decision in the Grand Gulf sale-leaseback renewal complaint discussed above. System Energy agreed that the hearing should be held in abeyance but sought rehearing of FERC’s decision as related to matters set for hearing that were beyond the scope of FERC’s jurisdiction or authority. The complainants sought rehearing of FERC’s decision to hold the hearing in abeyance and filed a motion to proceed, which motion System Energy subsequently opposed. In June 2021, System Energy’s request for rehearing was denied by operation of law, and System Energy filed an appeal of FERC’s orders in the Court of Appeals for the Fifth Circuit. The appeal was initially stayed for a period of 90 days, but the stay expired. In November 2021 the Fifth Circuit dismissed the appeal as premature.

In August 2021 the FERC issued an order addressing System Energy’s and the complainants’ rehearing requests. The FERC dismissed part of the complaint seeking an equity re-opener, maintained the abeyance for issues related to the proceeding addressing the sale-leaseback renewal and uncertain tax positions, lifted the abeyance for issues unrelated to that proceeding, and clarified the scope of the hearing. A procedural schedule was established, with the hearing scheduled for June 2022 and the ALJ’s initial decision scheduled for November 2022. Discovery is ongoing.
In November 2021 the LPSC, APSC, and City Council filed direct testimony and requested the FERC to order refunds for prior periods and prospective amendments to the Unit Power Sales Agreement. The LPSC’s refund claims include, among other things, allegations that: (1) System Energy should not have included certain sale-leaseback transaction costs in prepayments; (2) System Energy should have credited rate base to reflect the time value of money associated with the advance collection of lease payments; (3) System Energy incorrectly included refueling outage costs that were recorded in account 174 in rate base; and (4) System Energy should have excluded several accumulated deferred income tax balances in account 190 from rate base. The LPSC is also seeking a retroactive adjustment to retained earnings and capital structure in conjunction with the implementation of its proposed refunds. In addition, the LPSC seeks amendments to the Unit Power Sales Agreement going forward to address below-the-line costs, incentive compensation, the working capital allowance, litigation expenses, and the 2019 termination of the capital funds agreement. The APSC argues that: (1) System Energy should have included borrowings from the Entergy System money pool in its determination of short-term debt in its cost of capital; and (2) System Energy should credit customers with System Energy’s allocation of earnings on money pool investments. The City Council alleges that System Energy has maintained excess cash on hand in the money pool and that retention of excess cash was imprudent. Based on this allegation, the City Council’s witness recommends a refund of approximately $98.8 million for the period 2004-September 2021 or other alternative relief. The City Council further recommends that the FERC impose a hypothetical equity ratio such as 48.15% equity to capital on a prospective basis.

In January 2022, System Energy filed answering testimony arguing that the FERC should not order refunds for prior periods or any prospective amendments to the Unit Power Sales Agreement. In response to the LPSC’s refund claims, System Energy argues, among other things, that (1) the inclusion of sale-leaseback transaction costs in prepayments was correct; (2) that the filed rate doctrine bars the request for a retroactive credit to rate base for the time value of money associated with the advance collection of lease payments; (3) that an accounting misclassification for deferred refueling outage costs has been corrected, caused no harm to customers, and requires no refunds; and (4) that its accounting and ratemaking treatment of specified accumulated deferred income tax balances in account 190 has been correct. System Energy further responds that no retroactive adjustment to retained earnings or capital structure should be ordered because there is no general policy requiring such a remedy and there was no showing that the retained earnings element of the capital structure was incorrectly implemented. Further, System Energy presented evidence that all of the costs that are being challenged were long known to the retail regulators and were approved by them for inclusion in retail rates, and the attempt to retroactively challenge these costs, some of which have been included in rates for decades, is unjust and unreasonable. In response to the LPSC’s proposed going-forward adjustments, System Energy presents evidence to show that none of the proposed adjustments are needed. On the issue of below-the-line expenses, during discovery procedures System Energy identified a historical allocation error in certain months and agreed to provide a bill credit to customers to correct the error. In response to the APSC’s claims, System Energy argues that the Unit Power Sales Agreement does not include System Energy’s borrowings from the Entergy System money pool or earnings on deposits to the Entergy System money pool in the determination of the cost of capital; and accordingly, no refunds are appropriate on those issues. In response to the City Council’s claims, System Energy argues that it has reasonably managed its cash and that the City Council’s theory of cash management is defective because it fails to adequately consider the relevant cash needs of System Energy and it makes faulty presumptions about the operation of the Entergy System money pool. System Energy further points out that the issue of its capital structure is already subject to pending FERC litigation.

Grand Gulf Prudence Complaint

The second of the additional complaints was filed at the FERC in March 2021 by the LPSC, the APSC, and the City Council against System Energy, Entergy Services, Entergy Operations, and Entergy Corporation. The second complaint contains two primary allegations. First, it alleges that, based on the plant’s capacity factor and alleged safety performance, System Energy and the other respondents imprudently operated Grand Gulf during the period 2016-2020, and it seeks refunds of at least $360 million in alleged replacement energy costs, in addition to other costs, including those that can only be identified upon further investigation. Second, it alleges that the
performance and/or management of the 2012 extended power uprate of Grand Gulf was imprudent, and it seeks refunds of all costs of the 2012 uprate that are determined to result from imprudent planning or management of the project. In addition to the requested refunds, the complaint asks that the FERC modify the Unit Power Sales Agreement to provide for full cost recovery only if certain performance indicators are met and to require pre-authorization of capital improvement projects in excess of $125 million before related costs may be passed through to customers in rates. In April 2021, System Energy and the other respondents filed their motion to dismiss and answer to the complaint. System Energy requested that the FERC dismiss the claims within the complaint. With respect to the claim concerning operations, System Energy argues that the complaint does not meet its legal burden because, among other reasons, it fails to allege any specific imprudent conduct. With respect to the claim concerning the uprate, System Energy argues that the complaint fails because, among other reasons, the complainants’ own conduct prevents them from raising a serious doubt as to the prudence of the uprate. System Energy also requests that the FERC dismiss other elements of the complaint, including the proposed modifications to the Unit Power Sales Agreement, because they are not warranted. Additional responsive pleadings were filed by the complainants and System Energy during the period from March through July 2021. The pleadings are pending FERC action.
Storm Cost Recovery Filings with Retail Regulators

Entergy Louisiana

Hurricane Laura, Hurricane Delta, Hurricane Zeta, Winter Storm Uri, and Hurricane Ida

In August 2020 and October 2020, Hurricane Laura, Hurricane Delta, and Hurricane Zeta caused significant damage to portions of Entergy Louisiana’s service area. The storms resulted in widespread outages, significant damage to distribution and transmission infrastructure, and the loss of sales during the outages. Additionally, as a result of Hurricane Laura’s extensive damage to the grid infrastructure serving the impacted area, large portions of the underlying transmission system required nearly a complete rebuild.

In October 2020, Entergy Louisiana filed an application at the LPSC seeking approval of certain ratemaking adjustments in connection with the issuance of shorter-term mortgage bonds to provide interim financing for restoration costs associated with Hurricane Laura, Hurricane Delta, and Hurricane Zeta. Subsequently, Entergy Louisiana and the LPSC staff filed a joint motion seeking approval to exclude from the derivation of Entergy Louisiana’s capital structure and cost rate of debt for ratemaking purposes, including the allowance for funds used during construction, shorter-term debt up to $1.1 billion issued by Entergy Louisiana to fund costs associated with Hurricane Laura, Hurricane Delta, and Hurricane Zeta costs on an interim basis. In November 2020 the LPSC issued an order approving the joint motion, and Entergy Louisiana issued $1.1 billion of 0.62% Series mortgage bonds due November 2023. Also in November 2020, Entergy Louisiana withdrew $257 million from its funded storm reserves.

In February 2021 two winter storms (collectively, Winter Storm Uri) brought freezing rain and ice to Louisiana. Ice accumulation sagged or downed trees, limbs and power lines, causing damage to Entergy Louisiana’s transmission and distribution systems. The additional weight of ice caused trees and limbs to fall into power lines and other electric equipment. When the ice melted, it affected vegetation and electrical equipment, causing additional outages. As discussed above in “Fuel and purchased power recovery,” Entergy Louisiana recovered the incremental fuel costs associated with Winter Storm Uri over a five-month period from April 2021 through August 2021.

In April 2021, Entergy Louisiana filed an application with the LPSC relating to Hurricane Laura, Hurricane Delta, Hurricane Zeta, and Winter Storm Uri restoration costs and in July 2021, Entergy Louisiana made a supplemental filing updating the total restoration costs. Total restoration costs for the repair and/or replacement of Entergy Louisiana’s electric facilities damaged by these storms are currently estimated to be approximately $2.06 billion, including approximately $1.68 billion in capital costs and approximately $380 million in non-capital
costs. Including carrying costs through January 2022, Entergy Louisiana is seeking an LPSC determination that $2.11 billion was prudently incurred and, therefore, is eligible for recovery from customers. Additionally, Entergy Louisiana is requesting that the LPSC determine that re-establishment of a storm escrow account to the previously authorized amount of $290 million is appropriate. In July 2021, Entergy Louisiana supplemented the application with a request regarding the financing and recovery of the recoverable storm restoration costs. Specifically, Entergy Louisiana requested approval to securitize its restoration costs pursuant to Louisiana Act 55 financing, as supplemented by Act 293 of the Louisiana Legislature’s Regular Session of 2021. As previously discussed, in August 2021, Hurricane Ida caused extensive damage to Entergy Louisiana’s distribution and, to a lesser extent, transmission systems resulting in widespread power outages. In September 2021, Entergy Louisiana supplemented the application with a request to establish and securitize a $1 billion restricted storm escrow account for Hurricane Ida related restoration costs, subject to a subsequent prudence review. In total, Entergy Louisiana requested authorization for the issuance of system restoration bonds in one or more series in an aggregate principal amount of $3.18 billion, which includes the costs of re-establishing and funding a storm damage escrow account, carrying costs and unamortized debt costs on interim financing, and issuance costs. After filing of testimony by LPSC staff and intervenors, which generally supported or did not oppose Entergy Louisiana’s requests, the parties negotiated and executed an uncontested stipulated settlement which was filed with the LPSC in February 2022. The settlement agreement contains the following key terms: $2.1 billion of restoration costs from Hurricane Laura, Hurricane Delta, Hurricane Zeta, and Winter Storm Uri were prudently incurred and are eligible for recovery; carrying costs of $51 million are recoverable; a $290 million cash storm reserve should be re-established; a $1 billion reserve should be established to partially pay for Hurricane Ida restoration costs; and Entergy Louisiana is authorized to finance $3.186 billion utilizing the securitization process authorized by Act 55, as supplemented by Act 293. The LPSC voted to approve the settlement at its February 2022 meeting.

Hurricane Isaac

In August 2012, Hurricane Isaac caused extensive damage to Entergy Louisiana’s service area.  In June 2014 the LPSC authorized Entergy Louisiana to utilize Louisiana Act 55 financing for Hurricane Isaac system restoration costs.  Entergy Louisiana committed to pass on to customers a minimum of $30.8 million of customer benefits through annual customer credits of approximately $6.2 million for five years. Approvals for the Act 55 financings were obtained from the Louisiana Utilities Restoration Corporation (LURC) and the Louisiana State Bond Commission.

In August 2014 the Louisiana Local Government Environmental Facilities and Community Development Authority (LCDA) issued $314.85 million in bonds under Louisiana Act 55.  From the $309 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $16 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $293 million directly to Entergy Louisiana.  Entergy Louisiana used the $293 million received from the LURC to acquire 2,935,152.69 Class C preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 7.5% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2014, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement. The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1.75 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

In the first quarter 2020, Entergy and the IRS agreed upon and settled on the treatment of funds received by Entergy Louisiana in conjunction with the Act 55 financing of Hurricane Isaac storm costs, which resulted in a net reduction of income tax expense of approximately $32 million. As a result of the settlement, the position was
partially sustained and Entergy Louisiana recorded a reduction of income tax expense of approximately $58 million primarily due to the reversal of liabilities for uncertain tax positions in excess of the agreed-upon settlement. Entergy recorded an increase to income tax expense of $26 million primarily resulting from the reduction of the deferred tax asset, associated with utilization of the net operating loss as a result of the settlement. This adjustment recorded by Entergy also accounted for the tax rate change of the Tax Cuts and Jobs Act. As a result of the IRS settlement, Entergy Louisiana recorded a $29 million ($21 million net-of-tax) regulatory charge and a corresponding regulatory liability to reflect its obligation to customers pursuant to the LPSC Hurricane Isaac Act 55 financing order.

Hurricane Gustav and Hurricane Ike

In September 2008, Hurricane Gustav and Hurricane Ike caused catastrophic damage to Entergy Louisiana’s service territory.  In December 2009, Entergy Louisiana entered into a stipulation agreement with the LPSC staff regarding its storm costs.  In March and April 2010, Entergy Louisiana and other parties to the proceeding filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal to utilize Act 55 financing, which included a commitment to pass on to customers a minimum of $43.3 million of customer benefits through a prospective annual rate reduction of $8.7 million for five years.  In April 2010 the LPSC approved the settlement and subsequently issued financing orders and a ratemaking order intended to facilitate the implementation of the Act 55 financings.  In June 2010 the Louisiana State Bond Commission approved the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricane Gustav and Hurricane Ike was reduced by $2.7 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2010 the LCDA issued two series of bonds totaling $713.0 million under Act 55.  From the $702.7 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $290 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $412.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana used $412.7 million to acquire 4,126,940.15 Class B preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 9% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2010, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA, and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

Hurricane Katrina and Hurricane Rita

In August and September 2005, Hurricanes Katrina and Rita caused catastrophic damage to Entergy Louisiana’s service territory. In March 2008, Entergy Louisiana and the LURC filed at the LPSC an application requesting that the LPSC grant a financing order authorizing the financing of Entergy Louisiana storm costs, storm reserves, and issuance costs pursuant to Louisiana Act 55.  Entergy Louisiana also filed an application requesting LPSC approval for ancillary issues including the mechanism to flow charges and savings to customers via a storm cost offset rider.  In April 2008 the Louisiana Public Facilities Authority (LPFA), which is the issuer of the bonds
pursuant to the Act 55 financing, approved requests for the Act 55 financing.  Also in April 2008, Entergy Louisiana and the LPSC staff filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal under the Act 55 financing, which included a commitment to pass on to customers a minimum of $40 million of customer benefits through a prospective annual rate reduction of $8 million for five years.  The LPSC subsequently approved the settlement and issued two financing orders and one ratemaking order intended to facilitate implementation of the Act 55 financing.  In May 2008 the Louisiana State Bond Commission granted final approval of the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricanes Katrina and Rita was reduced by $22.3 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2008 the LPFA issued $687.7 million in bonds under the aforementioned Act 55.  From the $679 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $152 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $527 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $545 million, including $17.8 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 5,449,861.85 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 10% annual distribution rate.  In August 2008 the LPFA issued $278.4 million in bonds under the aforementioned Act 55.  From the $274.7 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $87 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $187.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $189.4 million, including $1.7 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 1,893,918.39 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC that carry a 10% annual distribution rate.  Distributions are payable quarterly commencing on September 15, 2008 and have a liquidation price of $100 per unit.  The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.  

The bonds were repaid in 2018. Entergy and Entergy Louisiana did not report the bonds issued by the LPFA on their balance sheets because the bonds are the obligation of the LPFA, and there was no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collected a system restoration charge on behalf of the LURC and remitted the collections to the bond indenture trustee.  Entergy and Entergy Louisiana did not report the collections as revenue because Entergy Louisiana was merely acting as the billing and collection agent for the state.

Entergy Mississippi

Entergy Mississippi has approval from the MPSC to collect a storm damage provision of $1.75 million per month. If Entergy Mississippi’s accumulated storm damage provision balance exceeds $15 million, the collection of the storm damage provision ceases until such time that the accumulated storm damage provision becomes less than $10 million. Entergy Mississippi’s storm damage provision balance has been less than $10 million since May 2019, and Entergy Mississippi has been billing the monthly storm damage provision since July 2019.
Entergy New Orleans

Hurricane Zeta

In October 2020, Hurricane Zeta caused significant damage to Entergy New Orleans’s service area. The storm resulted in widespread power outages, significant damage to distribution and transmission infrastructure, and the loss of sales during the power outages. In March 2021, Entergy New Orleans withdrew $44 million from its funded storm reserves. In May 2021, Entergy New Orleans filed an application with the City Council requesting approval and certification that its system restoration costs associated with Hurricane Zeta of approximately $36 million, including approximately $28 million in capital costs and approximately $8 million in non-capital costs, were reasonable and necessary to enable Entergy New Orleans to restore electric service to its customers and Entergy New Orleans’s electric utility infrastructure.

Entergy Texas

Hurricane Laura, Hurricane Delta, and Winter Storm Uri

In August 2020 and October 2020, Hurricane Laura and Hurricane Delta caused extensive damage to Entergy Texas’s service area. In February 2021, Winter Storm Uri also caused damage to Entergy Texas’s service area. The storms resulted in widespread power outages, significant damage primarily to distribution and transmission infrastructure, and the loss of sales during the power outages. In April 2021, Entergy Texas filed an application with the PUCT requesting a determination that approximately $250 million of system restoration costs associated with Hurricane Laura, Hurricane Delta, and Winter Storm Uri, including approximately $200 million in capital costs and approximately $50 million in non-capital costs, were reasonable and necessary to enable Entergy Texas to restore electric service to its customers and Entergy Texas’s electric utility infrastructure. The filing also included the projected balance of approximately $13 million of a regulatory asset containing previously approved system restoration costs related to Hurricane Harvey. In September 2021 the parties filed an unopposed settlement agreement, pursuant to which Entergy Texas removed from the amount to be securitized approximately $4.3 million that will instead be charged to its storm reserve, $5 million related to no particular issue, of which Entergy Texas would be permitted to seek recovery in a future proceeding, and approximately $300 thousand related to attestation costs. In December 2021 the PUCT issued an order approving the unopposed settlement and determining system restoration costs of $243 million related to Hurricane Laura, Hurricane Delta, and Winter Storm Uri and the $13 million projected remaining balance of the Hurricane Harvey system restoration costs were eligible for securitization. The order also determines that Entergy Texas can recover carrying costs on the system restoration costs related to Hurricane Laura, Hurricane Delta, and Winter Storm Uri.

In July 2021, Entergy Texas filed with the PUCT an application for a financing order to approve the securitization of the system restoration costs that are the subject of the April 2021 application. In November 2021 the parties filed an unopposed settlement agreement supporting the issuance of a financing order consistent with Entergy Texas’s application and with minor adjustments to certain upfront and ongoing costs to be incurred to facilitate the issuance and serving of system restoration bonds. In January 2022 the PUCT issued a financing order consistent with the unopposed settlement.
Entergy Louisiana [Member]  
Rate And Regulatory Matters RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)
Regulatory Assets and Regulatory Liabilities

Regulatory assets represent probable future revenues associated with costs that Entergy expects to recover from customers through the regulatory ratemaking process under which the Utility business operates. Regulatory liabilities represent probable future reductions in revenues associated with amounts that Entergy expects to benefit customers through the regulatory ratemaking process under which the Utility business operates. In addition to the regulatory assets and liabilities that are specifically disclosed on the face of the balance sheets, the tables below provide detail of “Other regulatory assets” and “Other regulatory liabilities” that are included on Entergy’s and the Registrant Subsidiaries’ balance sheets as of December 31, 2021 and 2020:

Other Regulatory Assets

Entergy
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
$2,327.7 $3,027.5 
Removal costs (Note 9)
1,488.8 893.8 
Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 2 - Hurricane Ida and Storm Cost Recovery Filings with Retail Regulators and Note 5 - Securitization Bonds)
993.6 379.2 
Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
935.5 1,018.9 
Retired electric and gas meters - recovered through retail rates as determined by retail regulators
179.4 192.1 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
133.1 105.7 
Opportunity Sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding) (b)
131.8 131.8 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
113.2 16.9 
Unamortized loss on reacquired debt - recovered over term of debt
74.7 79.2 
Retail rate deferrals - recovered through formula rates or rate riders as rates are redetermined by retail regulators
66.1 66.0 
Attorney General litigation costs - recovered over a six-year period through March 2026 (b)
20.5 25.3 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
19.0 — 
New nuclear generation development costs - recovery through formula rate plan December 2014 through November 2022 (b)
6.8 14.2 
Other123.1 125.9 
Entergy Total$6,613.3 $6,076.5 
Entergy Arkansas
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
$640.0 $831.5 
Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
489.2 479.3 
Removal costs (Note 9)
224.3 212.6 
Opportunity sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding) (b)
131.8 131.8 
Retired electric meters - recovered over 15-year period through March 2034
43.4 46.9 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
39.8 9.5 
Storm damage costs - recovered either through securitization or retail rates (Note 5 - Entergy Arkansas Securitization Bonds)
39.3 42.7 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
32.6 10.5 
Unamortized loss on reacquired debt - recovered over term of debt
23.1 24.7 
ANO Fukushima and Flood Barrier costs - recovered through retail rates through February 2026 (Note 2 - Retail Rate Proceedings) (b)
7.3 9.1 
Retail rate deferrals - recovered through rate riders as rates are redetermined annually (b)
1.0 12.6 
Other17.9 21.2 
Entergy Arkansas Total$1,689.7 $1,832.4 
Entergy Louisiana
 20212020
 (In Millions)
Removal costs (Note 9)
$848.2 $302.5 
Storm damage costs, including hurricane costs - recovery expected through retail rates and securitization (Note 2 - Hurricane Ida and Storm Cost Recovery Filings with Retail Regulators)
773.6 94.0 
Pension & postretirement costs (Note 11 - Qualified Pension Plans and Non-Qualified Pension Plans) (a)
592.7 799.4 
Asset Retirement Obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
286.6 299.0 
Retired electric meters - recovered over a 22-year period through July 2041
91.7 96.4 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
56.3 48.8 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
55.0 5.4 
Unamortized loss on reacquired debt - recovered over term of debt
26.9 26.6 
New nuclear generation development costs - recovery through formula rate plan December 2014 through November 2022 (b)
6.7 14.0 
Other39.0 40.0 
Entergy Louisiana Total$2,776.7 $1,726.1 

Entergy Mississippi
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
$175.4 $242.7 
Removal costs (Note 9)
136.8 107.3 
Retail rate deferrals - returned through formula rates or rate riders as rates are redetermined annually
48.1 44.3 
Attorney General litigation costs - recovered over a six-year period through March 2026 (b)
20.5 25.3 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
19.0 — 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
15.0 19.2 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
13.8 2.0 
Unamortized loss on reacquired debt - recovered over term of debt
12.2 13.5 
Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
8.4 7.9 
Other13.2 5.1 
Entergy Mississippi Total$462.4 $467.3 
Entergy New Orleans
 20212020
 (In Millions)
Removal costs (Note 9)
$91.7 $63.2 
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
44.9 75.7 
Storm damage costs, including hurricane costs - recovered through securitization or retail rates (Note 2 - Storm Cost Recovery Filings with Retail Regulators and Note 5 - Entergy New Orleans Securitization Bonds - Hurricane Isaac)
31.2 55.2 
Retired meters - recovered over a 12-year period through July 2031 (b)
19.6 21.7 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
17.4 14.3 
Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
5.4 5.2 
Unamortized loss on reacquired debt - recovered over term of debt
1.6 1.9 
Other36.8 29.6 
Entergy New Orleans Total$248.6 $266.8 

Entergy Texas
 20212020
 (In Millions)
Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 2 - Storm Cost Recovery Filings with Retail Regulators and Note 5 - Entergy Texas Securitization Bonds - Hurricane Rita and Entergy Texas Securitization Bonds - Hurricane Ike and Hurricane Gustav)
$143.1 $187.3 
Removal costs (Note 9)
98.1 115.3 
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
96.0 140.1 
Retired electric meters - recovered over 13-year period through February 2032
23.7 26.0 
Neches and Sabine costs - recovered over a 10-year period through September 2028 (Note 2 - Retail Rate Proceedings)
16.4 18.8 
Pension & postretirement benefits expense deferral - recovery period to be determined (Note 11 - Entergy Texas Reserve)
14.6 3.8 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
11.7 12.9 
Unamortized loss on reacquired debt - recovered over term of debt
9.8 10.5 
Other7.9 10.0 
Entergy Texas Total$421.3 $524.7 
System Energy
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans and Other Postretirement Benefits) (a)
$160.3 $217.8 
Asset retirement obligation - recovery dependent upon timing of decommissioning (Note 9) (a)
144.4 226.3 
Removal costs - recovered through depreciation rates (Note 9)
89.7 92.9 
Unamortized loss on reacquired debt - recovered over term of debt
1.1 2.0 
System Energy Total$395.5 $539.0 

(a)Does not earn a return on investment, but is offset by related liabilities.
(b)Does not earn a return on investment.

Hurricane Ida

In August 2021, Hurricane Ida caused extensive damage to the Entergy distribution and, to a lesser extent, transmission systems across Louisiana resulting in widespread power outages. Total restoration costs for the repair and/or replacement of the electrical system damaged by Hurricane Ida for Entergy Louisiana and Entergy New Orleans are currently estimated to be approximately $2.7 billion. Also, Utility revenues in 2021 were adversely affected by extended power outages resulting from the hurricane.

Entergy has recorded accounts payable for the estimated costs incurred that were necessary to return customers to service. Entergy recorded corresponding regulatory assets of approximately $1.1 billion, including $1 billion at Entergy Louisiana and $80 million at Entergy New Orleans, and construction work in progress of approximately $1.6 billion, including $1.5 billion at Entergy Louisiana and $120 million at Entergy New Orleans. Entergy recorded the regulatory assets in accordance with its accounting policies and based on the historic treatment of such costs in its service area because management believes that recovery through some form of regulatory mechanism is probable. There are well-established mechanisms and precedent for addressing these catastrophic events and providing for recovery of prudently incurred storm costs in accordance with applicable regulatory and legal principles. Because Entergy has not gone through the regulatory process regarding these storm costs, there is an element of risk, and Entergy is unable to predict with certainty the degree of success it may have in its recovery initiatives, the amount of restoration costs that it may ultimately recover, or the timing of such recovery.

Entergy is considering all available avenues to recover storm-related costs from Hurricane Ida, including federal government assistance and securitization financing. In September 2021, Entergy Louisiana filed an application at the LPSC seeking approval of certain ratemaking adjustments in connection with the issuance of approximately $1 billion of shorter-term mortgage bonds to provide interim financing for restoration costs associated with Hurricane Ida, which bonds were issued in October 2021. Also in September 2021, as discussed below in “Storm Cost Filings with Retail Regulators - Entergy Louisiana - Hurricane Laura, Hurricane Delta, Hurricane Zeta, Winter Storm Uri, and Hurricane Ida,” Entergy Louisiana sought approval for the creation and funding of a $1 billion restricted escrow account for Hurricane Ida restoration costs, subject to a subsequent prudence review. In September 2021, Entergy New Orleans withdrew $39 million from its funded storm reserves. Storm cost recovery or financing will be subject to review by applicable regulatory authorities. In February 2022, Entergy New Orleans filed with the City Council a securitization application requesting that the City Council review Entergy New Orleans’s storm reserve and increase the storm reserve funding level to $150 million, to be funded through securitization.
Other Regulatory Liabilities

Entergy
 20212020
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$1,993.3 $1,694.1 
Louisiana Act 55 financing savings obligation (Note 3) (b)
127.4 144.3 
Retail rate over-recovery - refunded through formula rate or rate riders as rates are redetermined annually
126.5 75.1 
Vidalia purchased power agreement (Note 8) (b)
106.2 115.7 
Grand Gulf sale-leaseback - (Note 5 - Grand Gulf Sale-Leaseback Transactions)
55.6 55.6 
Asset retirement obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
45.5 29.7 
Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4 44.4 
Internal restructuring guaranteed tax credits19.8 26.4 
Deferred tax equity partnership earnings (Note 1)
18.1 — 
Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates December 2015 through November 2024
16.0 21.5 
Advanced metering system (AMS) surcharge - return to customers dependent upon AMS spend
7.3 20.1 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
— 43.5 
Other83.7 53.5 
Entergy Total$2,643.8 $2,323.9 

Entergy Arkansas
 20212020
 (In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$685.4 $597.4 
Internal restructuring guaranteed customer credits19.8 26.4 
Retail rate rider over-recovery - refunded through rate riders as rates are redetermined annually
18.9 19.6 
Deferred tax equity partnership earnings (Note 1)
18.1 — 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
— 43.5 
Other1.1 — 
Entergy Arkansas Total$743.3 $686.9 
Entergy Louisiana
 20212020
 (In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$692.2 $567.7 
Louisiana Act 55 financing savings obligation (Note 3)
127.4 144.3 
Vidalia purchased power agreement (Note 8) (b)
106.2 115.7 
Asset retirement obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
45.5 29.7 
Retail rate rider over-recovery - refunded through rate riders as rates are determined annually
30.7 36.0 
Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates December 2015 through November 2024
16.0 21.5 
Derivative Instruments & Hedging Activities (Note 15)
11.4 — 
Other13.2 3.4 
Entergy Louisiana Total$1,042.6 $918.3 

Entergy Mississippi
 20212020
 (In Millions)
Retail rate rider over-recovery - refunded through rate riders as rates are redetermined annually
$34.2 $14.2 
Grand Gulf over-recovery - returned to customers through rate riders as rates are redetermined annually
15.1 1.0 
Other— 0.6 
Entergy Mississippi Total$49.3 $15.8 

Entergy Texas
 20212020
 (In Millions)
Retail refunds - return to customers to be determined
$22.8 $— 
Advanced metering system (AMS) surcharge - returned to customers dependent upon AMS spend
7.3 20.1 
Income tax rate change - refunded through a rate rider (Note 2 - Retail Rate Proceedings)
2.7 6.5 
Transition to competition costs - returned to customers through rate riders when rates are redetermined periodically
— 3.2 
Other 4.3 2.5 
Entergy Texas Total$37.1 $32.3 
System Energy
 20212020
 (In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$615.7 $529.0 
Grand Gulf sale-leaseback - (Note 5 - Grand Gulf Sale-Leaseback Transactions)
55.6 55.6 
Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4 44.4 
Grand Gulf sale-leaseback accumulated deferred income taxes (a)
25.6 25.7 
Entergy Mississippis accumulated accelerated Grand Gulf amortization - amortized and credited through the Unit Power Sales Agreement
3.6 10.7 
System Energy Total$744.9 $665.4 

(a)Offset by related asset.
(b)As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21% effective January 2018, the Vidalia purchased power agreement regulatory liability was reduced by $30.5 million and the Louisiana Act 55 financing savings obligation regulatory liabilities were reduced by $25 million, with corresponding increases to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

Regulatory activity regarding the Tax Cuts and Jobs Act

See the “Other Tax Matters - Tax Cuts and Jobs Act” section in Note 3 to the financial statements for discussion of the effects of the December 2017 enactment of the Tax Cuts and Jobs Act (Tax Act), including its effects on Entergy’s and the Registrant Subsidiaries’ regulatory asset/liability for income taxes.

Entergy Arkansas

Consistent with its previously stated intent to return unprotected excess accumulated deferred income taxes to customers as expeditiously as possible, Entergy Arkansas initiated a tariff proceeding in February 2018 proposing to establish a tax adjustment rider to provide retail customers with certain tax benefits of $467 million associated with the Tax Act. For the residential customer class, unprotected excess accumulated deferred income taxes were returned to customers over a 21-month period from April 2018 through December 2019. For all other customer classes, unprotected excess accumulated deferred income taxes were returned to customers over a nine-month period from April 2018 through December 2018. A true-up provision also was included in the rider, with any over- or under-returned unprotected excess accumulated deferred income taxes credited or billed to customers during the billing month of January 2020, with any residual amounts of over- or under-returned unprotected excess accumulated deferred income taxes to be flowed through Entergy Arkansas’s energy cost recovery rider. In March 2018 the APSC approved the tax adjustment rider effective with the first billing cycle of April 2018.

As discussed below, in July 2018, Entergy Arkansas made its formula rate plan filing to set its formula rate for the 2019 calendar year. A hearing was held in May 2018 regarding the APSC’s inquiries into the effects of the Tax Act, including Entergy Arkansas’s proposal to utilize its formula rate plan rider for its customers to realize the remaining benefits of the Tax Act. Entergy Arkansas’s formula rate plan rider included a netting adjustment that compared actual annual results to the allowed rate of return on common equity. In July 2018 the APSC issued an order agreeing with Entergy Arkansas’s proposal to have the effects of the Tax Act on current income tax expense flow through Entergy Arkansas’s formula rate plan rider and with Entergy Arkansas’s treatment of protected and unprotected excess accumulated deferred income taxes. The APSC also directed Entergy Arkansas to submit in the tax adjustment rider proceeding, discussed above, the adjustments to all other riders affected by the Tax Act and to include an amendment for a true up mechanism where a rider affected by the Tax Act does not already contain a
true-up mechanism. Pursuant to a 2018 settlement agreement in Entergy Arkansas’s formula rate plan proceeding, Entergy Arkansas also removed the net operating loss accumulated deferred income tax asset caused by the Tax Act from Entergy Arkansas’s tax adjustment rider. Entergy Arkansas’s compliance tariff filings were accepted by the APSC in October 2018. In February 2021, pursuant to its 2020 formula rate plan evaluation report settlement, Entergy Arkansas flowed $5.6 million in credits to customers through the tax adjustment rider based on the outcome of certain federal tax positions and a decrease in the state tax rate.

Entergy Louisiana

In an electric formula rate plan settlement approved by the LPSC in April 2018 the parties agreed that Entergy Louisiana would return to customers one-half of its eligible unprotected excess deferred income taxes from May 2018 through December 2018 and return to customers the other half from January 2019 through August 2022. In addition, the settlement provided that in order to flow back to customers certain other tax benefits created by the Tax Act, Entergy Louisiana established a regulatory liability effective January 1, 2018 in the amount of $9.1 million per month to reflect these tax benefits already included in retail rates until new base rates under the formula rate plan were established in September 2018, and this regulatory liability was returned to customers over the September 2018 through August 2019 formula rate plan rate-effective period. The LPSC staff and intervenors in the settlement reserved the right to obtain data from Entergy Louisiana to confirm the determination of excess accumulated deferred income taxes resulting from the Tax Act and the analysis thereof as part of the formula rate plan review proceeding for the 2017 test year filing which, as discussed below, Entergy Louisiana filed in June 2018.

Entergy New Orleans

After enactment of the Tax Act the City Council passed a resolution ordering Entergy New Orleans to, effective January 1, 2018, record deferred regulatory liabilities to account for the Tax Act’s effect on Entergy New Orleans’s revenue requirement and to make a filing by mid-March 2018 regarding the Tax Act’s effects on Entergy New Orleans’s operating income and rate base and potential mechanisms for customers to receive benefits of the Tax Act. The City Council’s resolution also directed Entergy New Orleans to request that Entergy Services file with the FERC for revisions of the Unit Power Sales Agreement and MSS-4 replacement tariffs to address the return of excess accumulated deferred income taxes. Entergy submitted filings of this type to the FERC.

In March 2018, Entergy New Orleans filed its response to the resolution stating that the Tax Act reduced income tax expense from what was then reflected in rates by approximately $8.2 million annually for electric operations and by approximately $1.3 million annually for gas operations. In the filing, Entergy New Orleans proposed to return to customers from June 2018 through August 2019 the benefits of the reduction in income tax expense and its unprotected excess accumulated deferred income taxes through a combination of bill credits and investments in energy efficiency programs, grid modernization, and Smart City projects. Entergy New Orleans submitted supplemental information in April 2018 and May 2018. Shortly thereafter, Entergy New Orleans and the City Council’s advisors reached an agreement in principle that provides for benefits that will be realized by Entergy New Orleans customers through bill credits that started in July 2018 and offsets to future investments in energy efficiency programs, grid modernization, and Smart City projects, as well as additional benefits related to the filings made at the FERC. The agreement in principle was approved by the City Council in June 2018.

Entergy Texas

After enactment of the Tax Act the PUCT issued an order requiring most utilities, including Entergy Texas, beginning January 25, 2018, to record a regulatory liability for the difference between revenues collected under existing rates and revenues that would have been collected had existing rates been set using the new federal income tax rates and also for the balance of excess accumulated deferred income taxes. Entergy Texas had previously provided information to the PUCT staff and stated that it expected the PUCT to address the lower tax expense as part of Entergy Texas’s rate case expected to be filed in May 2018.
In May 2018, Entergy Texas filed its 2018 base rate case with the PUCT. Entergy Texas’s proposed rates and revenues reflected the inclusion of the federal income tax reductions due to the Tax Act. The PUCT issued an order in December 2018 establishing that 1) $25 million be credited to customers through a rider to reflect the lower federal income tax rate applicable to Entergy Texas from January 2018 through the date new rates were implemented, 2) $242.5 million of protected excess accumulated deferred income taxes be returned to customers through base rates under the average rate assumption method over the lives of the associated assets, and 3) $185.2 million of unprotected excess accumulated deferred income taxes be returned to customers through a rider. The unprotected excess accumulated deferred income taxes rider includes carrying charges and is in effect over a period of 12 months for larger customers and over a period of four years for other customers.

System Energy

In a filing made with the FERC in March 2018, System Energy proposed revisions to the Unit Power Sales Agreement to reflect the effects of the Tax Act. In the filing System Energy proposed to return identified quantities of unprotected excess accumulated deferred income taxes to its customers by the end of 2018. In May 2018 the FERC accepted System Energy’s proposed tax revisions with an effective date of June 1, 2018, subject to refund and the outcome of settlement and hearing procedures. Settlement discussions were terminated in April 2019, and a hearing was held in March 2020. The retail regulators of the Utility operating companies that are parties to the Unit Power Sales Agreement challenged the treatment and amount of excess accumulated deferred income tax liabilities associated with uncertain tax positions related to nuclear decommissioning. In July 2020 the presiding ALJ in the proceeding issued an initial decision finding that there is an additional $147 million in unprotected excess accumulated deferred income taxes related to System Energy’s uncertain decommissioning tax deduction. The initial decision determined that System Energy should have included the $147 million in its March 2018 filing. System Energy had not included credits related to the effect of the Tax Act on the uncertain decommissioning tax position because it was uncertain whether the IRS would allow the deduction. The initial decision rejected both System Energy’s alternative argument that any crediting should occur over a ten-year period and the retail regulators’ argument that any crediting should occur over a two-year period. Instead, the initial decision concluded that System Energy should credit the additional unprotected excess accumulated deferred income taxes in a single lump sum revenue requirement reduction following a FERC order addressing the initial decision.

The ALJ initial decision is an interim step in the FERC litigation process. In September 2020, System Energy filed a brief on exceptions with the FERC, re-urging its positions and requesting the reversal of the ALJ’s initial decision. In December 2020, the LPSC, APSC, MPSC, City Council, and FERC trial staff filed briefs opposing exceptions. The FERC will review the case and issue an order in the proceeding, and the FERC may accept, reject, or modify the ALJ’s initial decision in whole or in part. Credits, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.

As discussed below in Grand Gulf Sale-leaseback Renewal Complaint and Uncertain Tax Position Rate Base Issue,” in September 2020 the IRS issued a Notice of Proposed Adjustment (NOPA) and Entergy executed it. In September 2020, System Energy filed a motion to lodge the NOPA into the record in the FERC proceeding. In October 2020 the LPSC, APSC, MPSC, City Council, and FERC trial staff filed oppositions to System Energy’s motion. As a result of the NOPA, System Energy filed, in October 2020, a new Federal Power Act section 205 filing at the FERC to credit the excess accumulated deferred income taxes resulting from the decommissioning uncertain tax position. System Energy proposes to credit the entire amount of the excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position by issuing a one-time credit of $17.8 million. In November 2020, the LPSC, APSC, MPSC, and City Council filed a protest to the filing, and System Energy responded.

In November 2020 the IRS issued the Revenue Agent’s Report (RAR) for the 2014-2015 tax years and in December 2020 Entergy executed it. In December 2020, System Energy filed a motion to lodge the RAR into the record in the FERC proceeding addressing the Tax Cuts and Jobs Act. In January 2021 the LPSC, APSC, MPSC,
and City Council filed a joint answer opposing System Energy’s motion, and the FERC trial staff also filed an answer opposing System Energy’s motion.

As a result of the RAR, in December 2020, System Energy also filed an amendment to its Federal Power Act section 205 filing to credit excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position. The amendment proposed the inclusion of the RAR as support for the filing. In December 2020, the LPSC, APSC, and City Council filed a protest in response to the amendment, reiterating objections to the filing to credit excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position. In February 2021 the FERC issued an order accepting System Energy’s Federal Power Act section 205 filing subject to refund, setting it for hearing, and holding the hearing in abeyance.

In November 2020, System Energy filed a motion to vacate the ALJ’s decision, arguing that it had been overtaken by changed circumstances because of the IRS’s determination resulting from the NOPA and RAR. In January 2021 the LPSC, APSC, MPSC, and City Council filed a joint answer opposing System Energy’s motion, and the FERC trial staff also filed an answer opposing System Energy’s motion. Additional responsive pleadings were filed in February and March 2021. There is no formal deadline for FERC to rule on the motion.

Fuel and purchased power cost recovery

The Utility operating companies are allowed to recover fuel and purchased power costs through fuel mechanisms included in electric and gas rates that are recorded as fuel cost recovery revenues.  The difference between revenues collected and the current fuel and purchased power costs is generally recorded as “Deferred fuel costs” on the Utility operating companies’ financial statements.  The table below shows the amount of deferred fuel costs as of December 31, 2021 and 2020 that Entergy expects to recover (or return to customers) through fuel mechanisms, subject to subsequent regulatory review.

 20212020
 (In Millions)
Entergy Arkansas (a)$177.6 $15.2 
Entergy Louisiana (b)$213.5 $170.4 
Entergy Mississippi$121.9 ($14.7)
Entergy New Orleans (b)($3.5)$6.2 
Entergy Texas$48.3 ($85.4)

(a)Includes $68.8 million in 2021 and $68.2 million in 2020 of fuel and purchased power costs whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.
(b)Includes $168.1 million in both years for Entergy Louisiana and $4.1 million in both years for Entergy New Orleans of fuel, purchased power, and capacity costs, which do not currently earn a return on investment and whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.

Entergy Arkansas

Energy Cost Recovery Rider

Entergy Arkansas’s retail rates include an energy cost recovery rider to recover fuel and purchased energy costs in monthly customer bills.  The rider utilizes the prior calendar-year energy costs and projected energy sales for the twelve-month period commencing on April 1 of each year to develop an energy cost rate, which is redetermined annually and includes a true-up adjustment reflecting the over- or under-recovery, including carrying
charges, of the energy costs for the prior calendar year.  The energy cost recovery rider tariff also allows an interim rate request depending upon the level of over- or under-recovery of fuel and purchased energy costs.

In January 2014, Entergy Arkansas filed a motion with the APSC relating to its upcoming energy cost rate redetermination filing that was made in March 2014. In that motion, Entergy Arkansas requested that the APSC authorize Entergy Arkansas to exclude from the redetermination of its 2014 energy cost rate $65.9 million of incremental fuel and replacement energy costs incurred in 2013 as a result of the ANO stator incident. Entergy Arkansas requested that the APSC authorize Entergy Arkansas to retain that amount in its deferred fuel balance, with recovery to be reviewed in a later period after more information was available regarding various claims associated with the ANO stator incident. In February 2014 the APSC approved Entergy Arkansas’s request to retain that amount in its deferred fuel balance. In July 2017, Entergy Arkansas filed for a change in rates pursuant to its formula rate plan rider. In that proceeding, the APSC approved a settlement agreement agreed upon by the parties, including a provision that requires Entergy Arkansas to initiate a regulatory proceeding for the purpose of recovering funds currently withheld from rates and related to the stator incident, including the $65.9 million of deferred fuel and purchased energy costs previously noted, subject to certain timelines and conditions set forth in the settlement agreement. In October 2021 the APSC approved Entergy Arkansas’s second request to extend the deadline for initiating a regulatory proceeding for the purpose of recovering funds related to the stator incident for twelve additional months, or until December 1, 2022. See the “ANO Damage, Outage, and NRC Reviews” section in Note 8 to the financial statements for further discussion of the ANO stator incident.

In March 2017, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01164 per kWh to $0.01547 per kWh. The APSC staff filed testimony in March 2017 recommending that the redetermined rate be implemented with the first billing cycle of April 2017 under the normal operation of the tariff. Accordingly, the redetermined rate went into effect on March 31, 2017 pursuant to the tariff. In July 2017 the Arkansas Attorney General requested additional information to support certain of the costs included in Entergy Arkansas’s 2017 energy cost rate redetermination.

In March 2018, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01547 per kWh to $0.01882 per kWh. The Arkansas Attorney General filed a response to Entergy Arkansas’s annual redetermination filing requesting that the APSC suspend the proposed tariff to investigate the amount of the redetermination or, alternatively, to allow recovery subject to refund. Among the reasons the Attorney General cited for suspension were questions pertaining to how Entergy Arkansas forecasted sales and potential implications of the Tax Cuts and Jobs Act. Entergy Arkansas replied to the Attorney General’s filing and stated that, to the extent there are questions pertaining to its load forecasting or the operation of the energy cost recovery rider, those issues exceed the scope of the instant rate redetermination. Entergy Arkansas also stated that potential effects of the Tax Cuts and Jobs Act are appropriately considered in the APSC’s separate proceeding regarding potential implications of the tax law. The APSC general staff filed a reply to the Attorney General’s filing and agreed that Entergy Arkansas’s filing complied with the terms of the energy cost recovery rider. The redetermined rate became effective with the first billing cycle of April 2018. Subsequently in April 2018 the APSC issued an order declining to suspend Entergy Arkansas’s energy cost recovery rider rate and declining to require further investigation at that time of the issues suggested by the Attorney General in the proceeding. Following a period of discovery, the Attorney General filed a supplemental response in October 2018 raising new issues with Entergy Arkansas’s March 2018 rate redetermination and asserting that $45.7 million of the increase should be collected subject to refund pending further investigation. Entergy Arkansas filed to dismiss the Attorney General’s supplemental response, the APSC general staff filed a motion to strike the Attorney General’s filing, and the Attorney General filed a supplemental response disputing Entergy Arkansas and the APSC staff’s filing. Applicable APSC rules and processes authorize its general staff to initiate periodic audits of Entergy Arkansas’s energy cost recovery rider. In late-2018 the APSC general staff notified Entergy Arkansas it has initiated an audit of the 2017 fuel costs. The time in which the audit will be complete is uncertain at this time.
In March 2019, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected a decrease from $0.01882 per kWh to $0.01462 per kWh and became effective with the first billing cycle in April 2019. In March 2019 the Arkansas Attorney General filed a response to Entergy Arkansas’s annual adjustment and included with its filing a motion for investigation of alleged overcharges to customers in connection with the FERC’s October 2018 order in the opportunity sales proceeding. Entergy Arkansas filed its response to the Attorney General’s motion in April 2019 in which Entergy Arkansas stated its intent to initiate a proceeding to address recovery issues related to the October 2018 FERC order. In May 2019, Entergy Arkansas initiated the opportunity sales recovery proceeding, discussed below, and requested that the APSC establish that proceeding as the single designated proceeding in which interested parties may assert claims related to the appropriate retail rate treatment of the FERC October 2018 order and related FERC orders in the opportunity sales proceeding. In June 2019 the APSC granted Entergy Arkansas’s request and also denied the Attorney General’s motion in the energy cost recovery proceeding seeking an investigation into Entergy Arkansas’s annual energy cost recovery rider adjustment and referred the evaluation of such matters to the opportunity sales recovery proceeding.

In March 2020, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected a decrease from $0.01462 per kWh to $0.01052 per kWh. The redetermined rate became effective with the first billing cycle in April 2020 through the normal operation of the tariff.

In March 2021, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected a decrease from $0.01052 per kWh to $0.00959 per kWh. The redetermined rate calculation also included an adjustment to account for a portion of the increased fuel costs resulting from the February 2021 winter storms. The redetermined rate became effective with the first billing cycle in April 2021 through the normal operation of the tariff.

Entergy Louisiana

Entergy Louisiana recovers electric fuel and purchased power costs for the billing month based upon the level of such costs incurred two months prior to the billing month. Entergy Louisiana’s purchased gas adjustments include estimates for the billing month adjusted by a surcharge or credit that arises from an annual reconciliation of fuel costs incurred with fuel cost revenues billed to customers, including carrying charges.

In July 2014 the LPSC authorized its staff to initiate an audit of the fuel adjustment clause filings by Entergy Gulf States Louisiana, whose business was combined with Entergy Louisiana in 2015. The audit includes a review of the reasonableness of charges flowed through Entergy Gulf States Louisiana’s fuel adjustment clause for the period from 2010 through 2013. In January 2019 the LPSC staff consultant issued its audit report. In its report, the LPSC staff consultant recommended that Entergy Louisiana refund approximately $900,000, plus interest, to customers based upon the imputation of a claim of vendor fault in servicing its nuclear plant. Entergy Louisiana recorded a provision in the first quarter 2019 for the potential outcome of the audit. In August 2019, Entergy Louisiana filed direct testimony challenging the basis for the LPSC staff’s recommended disallowance and providing an alternative calculation of replacement power costs should it be determined that a disallowance is appropriate. Entergy Louisiana’s calculation would require no refund to customers.

In July 2014 the LPSC authorized its staff to initiate an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed by Entergy Louisiana through its fuel adjustment clause for the period from 2010 through 2013. In January 2019 the LPSC staff issued its audit report recommending that Entergy Louisiana refund approximately $7.3 million, plus interest, to customers based upon the imputation of a claim of vendor fault in servicing its nuclear plant. Entergy Louisiana recorded a provision in the first quarter 2019 for the potential outcome of the audit. In August 2019, Entergy Louisiana filed direct testimony challenging the basis for the LPSC staff’s recommended disallowance and providing an alternative calculation of replacement power costs should it be determined that a disallowance is appropriate. Entergy Louisiana’s calculation
would require a refund to customers of approximately $4.3 million, plus interest, as compared to the LPSC staff’s recommendation of $7.3 million, plus interest. Responsive testimony was filed by the LPSC staff and intervenors in September 2019; all parties either agreed with or did not oppose Entergy Louisiana’s alternative calculation of replacement power costs.

In November 2019 the pending LPSC proceedings for the 2010-2013 Entergy Louisiana and Entergy Gulf States Louisiana audits were consolidated to facilitate a settlement of both fuel audits. In December 2019 an unopposed settlement was reached that requires a refund to legacy Entergy Louisiana customers of approximately $2.3 million, including interest, and no refund to legacy Entergy Gulf States Louisiana customers. The LPSC approved the settlement in January 2020. A one-time refund was made in February 2020.

In March 2020 the LPSC staff provided notice of an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s fuel adjustment clause for the period from 2016 through 2019. In September 2021 the LPSC submitted its audit report and found that all costs recovered through the fuel adjustment clause were reasonable and eligible for recovery through the fuel adjustment clause. Intervenors are conducting discovery regarding the LPSC staff’s report.

In February 2021, Entergy Louisiana incurred extraordinary fuel costs associated with the February 2021 winter storms. To mitigate the effect of these costs on customer bills, in March 2021 Entergy Louisiana requested and the LPSC approved the deferral and recovery of $166 million in incremental fuel costs over five months beginning in April 2021. The incremental fuel costs remain subject to review for reasonableness and eligibility for recovery through the fuel adjustment clause mechanism. The final amount of incremental fuel costs is subject to change through the resettlement process. At its April 2021 meeting, the LPSC authorized its staff to review the prudence of the February 2021 fuel costs incurred by all LPSC-jurisdictional utilities. At its June 2021 meeting, the LPSC approved the hiring of consultants to assist its staff in this review. Discovery is ongoing.

In March 2021 the LPSC staff provided notice of an audit of Entergy Louisiana’s purchased gas adjustment clause filings covering the period January 2018 through December 2020. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s purchased gas adjustment clause for that period. Discovery is ongoing, and no audit report has been filed.

Entergy Mississippi

Entergy Mississippi’s rate schedules include an energy cost recovery rider that is adjusted annually to reflect accumulated over- or under-recoveries.  Entergy Mississippi’s fuel cost recoveries are subject to annual audits conducted pursuant to the authority of the MPSC.

In November 2018, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an under-recovery of approximately $57 million as of September 30, 2018. In January 2019 the MPSC approved the proposed energy cost factor effective for February 2019 bills.

In November 2019, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation included $39.6 million of prior over-recovery flowing back to customers beginning February 2020. Entergy Mississippi’s balance in its deferred fuel account did not decrease as expected after implementation of the new factor. In an effort to assist customers during the COVID-19 pandemic, in May 2020, Entergy Mississippi requested an interim adjustment to the energy cost recovery rider to credit approximately $50 million from the over-recovered balance in the deferred fuel account to customers over four consecutive billing months. The MPSC approved this interim adjustment in May 2020 effective for June through September 2020 bills.
In November 2020, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an over-recovery of approximately $24.4 million as of September 30, 2020. In January 2021 the MPSC approved the proposed energy cost factor effective for February 2021 bills.

In November 2021, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an under-recovery of approximately $80.6 million as of September 30, 2021. In December 2021, at the request of the MPSC, Entergy Mississippi submitted a proposal to mitigate the impact of rising fuel costs on customer bills during 2022. Entergy Mississippi proposed that the deferred fuel balance as of December 31, 2021, which was $121.9 million, be amortized over three years, and that the MPSC authorize Entergy Mississippi to apply its weighted-average cost of capital as the carrying cost for the unamortized fuel balance. In January 2022 the MPSC approved the amortization of $100 million of the deferred fuel balance over two years and authorized Entergy Mississippi to apply its weighted-average cost of capital as the carrying cost for the unamortized fuel balance. The MPSC approved the proposed energy cost factor effective for February 2022 bills.

Entergy New Orleans

Entergy New Orleans’s electric rate schedules include a fuel adjustment tariff designed to reflect no more than targeted fuel and purchased power costs, adjusted by a surcharge or credit for deferred fuel expense arising from the monthly reconciliation of actual fuel and purchased power costs incurred with fuel cost revenues billed to customers, including carrying charges.

Entergy New Orleans’s gas rate schedules include a purchased gas adjustment to reflect estimated gas costs for the billing month, adjusted by a surcharge or credit similar to that included in the electric fuel adjustment clause, including carrying charges.

Entergy Texas

Entergy Texas’s rate schedules include a fixed fuel factor to recover fuel and purchased power costs, including interest, not recovered in base rates.  Semi-annual revisions of the fixed fuel factor are made in March and September based on the market price of natural gas and changes in fuel mix.  The amounts collected under Entergy Texas’s fixed fuel factor and any interim surcharge or refund are subject to fuel reconciliation proceedings before the PUCT. A fuel reconciliation is required to be filed at least once every three years and outside of a base rate case filing.

In September 2019, Entergy Texas filed an application to reconcile its fuel and purchased power costs for the period from April 2016 through March 2019. During the reconciliation period, Entergy Texas incurred approximately $1.6 billion in Texas jurisdictional eligible fuel and purchased power expenses, net of certain revenues credited to such expenses and other adjustments. Entergy Texas estimated an under-recovery balance of approximately $25.8 million, including interest, which Entergy Texas requested authority to carry over as the beginning balance for the subsequent reconciliation period beginning April 2019. In March 2020 an intervenor filed testimony proposing that the PUCT disallow: (1) $2 million in replacement power costs associated with generation outages during the reconciliation period; and (2) $24.4 million associated with the operation of the Spindletop natural gas storage facility during the reconciliation period.  In April 2020, Entergy Texas filed rebuttal testimony refuting all points raised by the intervenor.  In June 2020 the parties filed a stipulation and settlement agreement, which included a $1.2 million disallowance not associated with any particular issue raised by any party. The PUCT approved the settlement in August 2020.

In July 2020, Entergy Texas filed an application with the PUCT to implement an interim fuel refund of $25.5 million, including interest. Entergy Texas proposed that the interim fuel refund be implemented beginning with the first August 2020 billing cycle over a three-month period for smaller customers and in a lump sum amount
in the billing month of August 2020 for transmission-level customers. The interim fuel refund was approved in July 2020, and Entergy Texas began refunds in August 2020.

In February 2021, Entergy Texas filed an application to implement a fuel refund for a cumulative over-recovery of approximately $75 million that is primarily attributable to settlements received by Entergy Texas from MISO related to Hurricane Laura. Entergy Texas planned to issue the refund over the period of March through August 2021. On February 22, 2021, Entergy Texas filed a motion to abate its fuel refund proceeding to assess how the February 2021 winter storm impacted Entergy Texas’s fuel over-recovery position. In March 2021, Entergy Texas withdrew its application to implement the fuel refund. Entergy Texas is continuing to evaluate its fuel balance and will file a subsequent refund or surcharge application consistent with the requirements of the PUCT’s rules.
Entergy Arkansas Opportunity Sales Proceeding

In June 2009 the LPSC filed a complaint requesting that the FERC determine that certain of Entergy Arkansas’s sales of electric energy to third parties: (a) violated the provisions of the System Agreement that allocated the energy generated by Entergy System resources; (b) imprudently denied the Entergy System and its ultimate consumers the benefits of low-cost Entergy System generating capacity; and (c) violated the provision of the System Agreement that prohibited sales to third parties by individual companies absent an offer of a right-of-first-refusal to other Utility operating companies.  The LPSC’s complaint challenged sales made beginning in 2002 and requested refunds.  In July 2009 the Utility operating companies filed a response to the complaint arguing among other things that the System Agreement contemplates that the Utility operating companies may make sales to third parties for their own account, subject to the requirement that those sales be included in the load (or load shape) for the applicable Utility operating company.  The FERC subsequently ordered a hearing in the proceeding.

After a hearing, the ALJ issued an initial decision in December 2010.  The ALJ found that the System Agreement allowed for Entergy Arkansas to make the sales to third parties but concluded that the sales should be accounted for in the same manner as joint account sales.  The ALJ concluded that “shareholders” should make refunds of the damages to the Utility operating companies, along with interest.  Entergy disagreed with several aspects of the ALJ’s initial decision and in January 2011 filed with the FERC exceptions to the decision.
The FERC issued a decision in June 2012 and held that, while the System Agreement is ambiguous, it does provide authority for individual Utility operating companies to make opportunity sales for their own account and Entergy Arkansas made and priced these sales in good faith.  The FERC found, however, that the System Agreement does not provide authority for an individual Utility operating company to allocate the energy associated with such opportunity sales as part of its load but provides a different allocation authority.  The FERC further found that the after-the-fact accounting methodology used to allocate the energy used to supply the sales was inconsistent with the System Agreement.  The FERC in its decision established further hearing procedures to quantify the effect of repricing the opportunity sales in accordance with the FERC’s June 2012 decision. The hearing was held in May 2013 and the ALJ issued an initial decision in August 2013. The LPSC, the APSC, the City Council, and FERC staff filed briefs on exceptions and/or briefs opposing exceptions. Entergy filed a brief on exceptions requesting that the FERC reverse the initial decision and a brief opposing certain exceptions taken by the LPSC and FERC staff.

In April 2016 the FERC issued orders addressing requests for rehearing filed in July 2012 and the ALJ’s August 2013 initial decision. The first order denied Entergy’s request for rehearing and affirmed the FERC’s earlier rulings that Entergy’s original methodology for allocating energy costs to the opportunity sales was incorrect and, as a result, Entergy Arkansas must make payments to the other Utility operating companies to put them in the same position that they would have been in absent the incorrect allocation. The FERC clarified that interest should be included with the payments. The second order affirmed in part, and reversed in part, the rulings in the ALJ’s August 2013 initial decision regarding the methodology that should be used to calculate the payments Entergy Arkansas is to make to the other Utility operating companies. The FERC affirmed the ALJ’s ruling that a full re-run of intra-system bills should be performed but required that methodology be modified so that the sales have the same priority for purposes of energy allocation as joint account sales. The FERC reversed the ALJ’s decision that any payments by Entergy Arkansas should be reduced by 20%. The FERC also reversed the ALJ’s decision that adjustments to other System Agreement service schedules and excess bandwidth payments should not be taken into account when calculating the payments to be made by Entergy Arkansas. The FERC held that such adjustments and excess bandwidth payments should be taken into account but ordered further proceedings before an ALJ to address whether a cap on any reduction due to bandwidth payments was necessary and to implement the other adjustments to the calculation methodology.

In May 2016, Entergy Services filed a request for rehearing of the FERC’s April 2016 order arguing that payments made by Entergy Arkansas should be reduced as a result of the timing of the LPSC’s approval of certain contracts. Entergy Services also filed a request for clarification and/or rehearing of the FERC’s April 2016 order addressing the ALJ’s August 2013 initial decision. The APSC and the LPSC also filed requests for rehearing of the FERC’s April 2016 order. In September 2017 the FERC issued an order denying the request for rehearing on the issue of whether any payments by Entergy Arkansas to the other Utility operating companies should be reduced due to the timing of the LPSC’s approval of Entergy Arkansas’s wholesale baseload contract with Entergy Louisiana. In November 2017 the FERC issued an order denying all of the remaining requests for rehearing of the April 2016 order. In November 2017, Entergy Services filed a petition for review in the D.C. Circuit of the FERC’s orders in the first two phases of the opportunity sales case. In December 2017 the D.C. Circuit granted Entergy Services’ request to hold the appeal in abeyance pending final resolution of the related proceeding before the FERC. In January 2018 the APSC and the LPSC filed separate petitions for review in the D.C. Circuit, and the D.C. Circuit consolidated the appeals with Entergy Services’ appeal.

The hearing required by the FERC’s April 2016 order was held in May 2017. In July 2017 the ALJ issued an initial decision addressing whether a cap on any reduction due to bandwidth payments was necessary and whether to implement the other adjustments to the calculation methodology. In August 2017 the Utility operating companies, the LPSC, the APSC, and FERC staff filed individual briefs on exceptions challenging various aspects of the initial decision. In September 2017 the Utility operating companies, the LPSC, the APSC, the MPSC, the City Council, and FERC staff filed separate briefs opposing exceptions taken by various parties.
Based on testimony previously submitted in the case and its assessment of the April 2016 FERC orders, in the first quarter 2016, Entergy Arkansas recorded a liability of $87 million, which included interest, for its estimated increased costs and payment to the other Utility operating companies, and a deferred fuel regulatory asset of $75 million. Following its assessment of the course of the proceedings, including the FERC’s denial of rehearing in November 2017 described above, in the fourth quarter 2017, Entergy Arkansas recorded an additional liability of $35 million and a regulatory asset of $31 million.

In October 2018 the FERC issued an order addressing the ALJ’s July 2017 initial decision. The FERC reversed the ALJ’s decision to cap the reduction in Entergy Arkansas’s payment to account for the increased bandwidth payments that Entergy Arkansas made to the other operating companies. The FERC also reversed the ALJ’s decision that Grand Gulf sales from January through September 2000 should be included in the calculation of Entergy Arkansas’s payment. The FERC affirmed on other grounds the ALJ’s rejection of the LPSC’s claim that certain joint account sales should be accounted for as part of the calculation of Entergy Arkansas’s payment. In November 2018 the LPSC requested rehearing of the FERC’s October 2018 decision. In December 2019 the FERC denied the LPSC’s request for rehearing. In January 2020 the LPSC appealed the December 2019 decision to the D.C. Circuit.

In December 2018, Entergy made a compliance filing in response to the FERC’s October 2018 order. The compliance filing provided a final calculation of Entergy Arkansas’s payments to the other Utility operating companies, including interest. No protests were filed in response to the December 2018 compliance filing. The December 2018 compliance filing is pending FERC action. Refunds and interest in the following amounts were paid by Entergy Arkansas to the other operating companies in December 2018:

 Total refunds including interest
Payment/(Receipt)
 (In Millions)
PrincipalInterestTotal
Entergy Arkansas$68$67$135
Entergy Louisiana($30)($29)($59)
Entergy Mississippi($18)($18)($36)
Entergy New Orleans($3)($4)($7)
Entergy Texas($17)($16)($33)

Entergy Arkansas previously recognized a regulatory asset with a balance of $116 million as of December 31, 2018 for a portion of the payments due as a result of this proceeding.

As described above, the FERC’s opportunity sales orders have been appealed to the D.C. Circuit. In February 2020 all of the appeals were consolidated and in April 2020 the D.C. Circuit established a briefing schedule. Briefing was completed in September 2020 and oral argument was heard in December 2020. In July 2021 the D.C. Circuit issued a decision denying all of the petitions for review filed in response to the FERC’s opportunity sales orders.

In February 2019 the LPSC filed a new complaint relating to two issues that were raised in the opportunity sales proceeding, but that, in its October 2018 order, the FERC held were outside the scope of the proceeding. In March 2019, Entergy Services filed an answer and motion to dismiss the new complaint. In November 2019 the FERC issued an order denying the LPSC’s complaint. The order concluded that the settlement agreement approved by the FERC in December 2015 terminating the System Agreement barred the LPSC’s new complaint. In December 2019 the LPSC requested rehearing of the FERC’s November 2019 order, and in July 2020 the FERC issued an order dismissing the LPSC’s request for rehearing. In September 2020 the LPSC appealed to the D.C. Circuit the FERC’s orders dismissing the new opportunity sales complaint. In November 2020 the D.C. Circuit
issued an order establishing that briefing will occur in January 2021 through April 2021. Oral argument was held in September 2021. In December 2021 the D.C. Circuit denied the LPSC’s Petition for Review of the new opportunity sales complaint. The opportunity sales cases are complete at FERC and at the D.C. Circuit and no additional refund amounts are owed by Entergy Arkansas.

In May 2019, Entergy Arkansas filed an application and supporting testimony with the APSC requesting approval of a special rider tariff to recover the costs of these payments from its retail customers over a 24-month period.  The application requested that the APSC approve the rider to take effect within 30 days or, if suspended by the APSC as allowed by commission rule, approve the rider to take effect in the first billing cycle of the first month occurring 30 days after issuance of the APSC’s order approving the rider. In June 2019 the APSC suspended Entergy Arkansas’s tariff and granted Entergy Arkansas’s motion asking the APSC to establish the proceeding as the single designated proceeding in which interested parties may assert claims related to the appropriate retail rate treatment of the FERC’s October 2018 order and related FERC orders in the opportunity sales proceeding. In January 2020 the APSC adopted a procedural schedule with a hearing in April 2020. In January 2020 the Attorney General and Arkansas Electric Energy Consumers, Inc. filed a joint motion seeking to dismiss Entergy Arkansas’s application alleging that the APSC, in a prior proceeding, ruled on the issues addressed in the application and determined that Entergy Arkansas’s requested relief violates the filed rate doctrine and the prohibition against retroactive ratemaking. Entergy Arkansas responded to the joint motion in February 2020 rebutting these arguments, including demonstrating that the claims in this proceeding differ substantially from those the APSC addressed previously and that the payment resulting from a FERC tariff violation for which Entergy Arkansas seeks retail cost recovery in this proceeding differs materially from the refunds resulting from a FERC tariff amendment that the APSC previously rejected on filed rate doctrine and the retroactive ratemaking grounds. In addition, in January 2020 the Attorney General and Arkansas Electric Energy Consumers, Inc. filed testimony opposing the recovery by Entergy Arkansas of the opportunity sales payment but also claiming that certain components of the payment should be segregated and refunded to customers. In March 2020, Entergy Arkansas filed rebuttal testimony.

In July 2020 the APSC issued a decision finding that Entergy Arkansas’s application is not in the public interest. The order also directed Entergy Arkansas to refund to its retail customers within 30 days of the order the FERC-determined over-collection of $13.7 million, plus interest, associated with a recalculated bandwidth remedy. In addition to these primary findings, the order also denied the Attorney General’s request for Entergy Arkansas to prepare a compliance filing detailing all of the retail impacts from the opportunity sales and denied a request by the Arkansas Electric Energy Consumers to recalculate all costs using the revised responsibility ratio. Entergy Arkansas filed a motion for temporary stay of the 30-day requirement to allow Entergy Arkansas a reasonable opportunity to seek rehearing of the APSC order, but in July 2020 the APSC denied Entergy Arkansas’s request for a stay and directed Entergy Arkansas to refund to its retail customers the component of the total FERC-determined opportunity sales payment that was associated with increased bandwidth remedy payments of $13.7 million, plus interest. The refunds were issued in the August 2020 billing cycle. While the APSC denied Entergy Arkansas’s stay request, Entergy Arkansas believes its actions were prudent and, therefore, the costs, including the $13.7 million, plus interest, are recoverable. In July 2020, Entergy Arkansas requested rehearing of the APSC order, which rehearing was denied by the APSC in August 2020. In September 2020, Entergy Arkansas filed a complaint in the U.S. District Court for the Eastern District of Arkansas challenging the APSC’s order denying Entergy Arkansas’s request to recover the costs of these payments. In October 2020 the APSC filed a motion to dismiss Entergy Arkansas’s complaint, to which Entergy Arkansas responded. Also in December 2020, Entergy Arkansas and the APSC held a pre-trial conference, and filed a report with the court in January 2021. The court held a hearing in February 2021 regarding issues addressed in the pre-trial conference report, and in June 2021 the court stayed all discovery until it rules on pending motions, after which the court will issue an amended schedule if necessary.
Complaints Against System Energy

System Energy’s operating revenues are derived from the allocation of the capacity, energy, and related costs associated with its 90% ownership/leasehold interest in Grand Gulf.  System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans pursuant to the Unit Power Sales Agreement. System Energy and the Unit Power Sales Agreement are currently the subject of several litigation proceedings at the FERC, including challenges with respect to System Energy’s authorized return on equity and capital structure, renewal of its sale-leaseback arrangement, treatment of uncertain tax positions, a broader investigation of rates under the Unit Power Sales Agreement, and a prudence complaint challenging the extended power uprate completed at Grand Gulf in 2012 and the operation and management of Grand Gulf, particularly in the 2016-2020 time period. The claims in these proceedings include claims for refunds and claims for rate adjustments; the aggregate amount of refunds claimed in these proceedings substantially exceeds the net book value of System Energy. Following are discussions of the proceedings.

Return on Equity and Capital Structure Complaints

In January 2017 the APSC and MPSC filed a complaint with the FERC against System Energy. The complaint seeks a reduction in the return on equity component of the Unit Power Sales Agreement pursuant to which System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. Entergy Arkansas also sells some of its Grand Gulf capacity and energy to Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under separate agreements. The current return on equity under the Unit Power Sales Agreement is 10.94%, which was established in a rate proceeding that became final in July 2001.

The APSC and MPSC complaint alleges that the return on equity is unjust and unreasonable because capital market and other considerations indicate that it is excessive. The complaint requests proceedings to investigate the return on equity and establish a lower return on equity, and also requests that the FERC establish January 23, 2017 as a refund effective date. The complaint includes return on equity analysis that purports to establish that the range of reasonable return on equity for System Energy is between 8.37% and 8.67%. System Energy answered the complaint in February 2017 and disputes that a return on equity of 8.37% to 8.67% is just and reasonable. The LPSC and the City Council intervened in the proceeding expressing support for the complaint. In September 2017 the FERC established a refund effective date of January 23, 2017 and directed the parties to engage in settlement proceedings before an ALJ. The parties were unable to settle the return on equity issue and a FERC hearing judge was assigned in July 2018. The 15-month refund period in connection with the APSC/MPSC complaint expired on April 23, 2018.

In April 2018 the LPSC filed a complaint with the FERC against System Energy seeking an additional 15-month refund period.  The LPSC complaint requests similar relief from the FERC with respect to System Energy’s return on equity and also requests the FERC to investigate System Energy’s capital structure.  The APSC, MPSC, and City Council intervened in the proceeding, filed an answer expressing support for the complaint, and asked the FERC to consolidate this proceeding with the proceeding initiated by the complaint of the APSC and MPSC in January 2017. System Energy answered the LPSC complaint in May 2018 and also filed a motion to dismiss the complaint. In August 2018 the FERC issued an order dismissing the LPSC’s request to investigate System Energy’s capital structure and setting for hearing the return on equity complaint, with a refund effective date of April 27, 2018. The 15-month refund period in connection with the LPSC return on equity complaint expired on July 26, 2019.

The portion of the LPSC’s complaint dealing with return on equity was subsequently consolidated with the APSC and MPSC complaint for hearing. The parties addressed an order (issued in a separate FERC proceeding involving New England transmission owners) that proposed modifying the FERC’s standard methodology for determining return on equity. In September 2018, System Energy filed a request for rehearing and the LPSC filed a request for rehearing or reconsideration of the FERC’s August 2018 order. The LPSC’s request referenced an
amended complaint that it filed on the same day raising the same capital structure claim the FERC had earlier dismissed. The FERC initiated a new proceeding for the amended capital structure complaint, and System Energy submitted a response in October 2018. In January 2019 the FERC set the amended complaint for settlement and hearing proceedings. Settlement proceedings in the capital structure proceeding commenced in February 2019. As noted below, in June 2019 settlement discussions were terminated and the amended capital structure complaint was consolidated with the ongoing return on equity proceeding. The 15-month refund period in connection with the capital structure complaint was from September 24, 2018 to December 23, 2019.

In January 2019 the LPSC and the APSC and MPSC filed direct testimony in the return on equity proceeding. For the refund period January 23, 2017 through April 23, 2018, the LPSC argues for an authorized return on equity for System Energy of 7.81% and the APSC and MPSC argue for an authorized return on equity for System Energy of 8.24%. For the refund period April 27, 2018 through July 27, 2019, and for application on a prospective basis, the LPSC argues for an authorized return on equity for System Energy of 7.97% and the APSC and MPSC argue for an authorized return on equity for System Energy of 8.41%. In March 2019, System Energy submitted answering testimony. For the first refund period, System Energy’s testimony argues for a return on equity of 10.10% (median) or 10.70% (midpoint). For the second refund period, System Energy’s testimony shows that the calculated returns on equity for the first period fall within the range of presumptively just and reasonable returns on equity, and thus the second complaint should be dismissed (and the first period return on equity used going forward). If the FERC nonetheless were to set a new return on equity for the second period (and going forward), System Energy argues the return on equity should be either 10.32% (median) or 10.69% (midpoint).

In May 2019 the FERC trial staff filed its direct and answering testimony in the return on equity proceeding. For the first refund period, the FERC trial staff calculates an authorized return on equity for System Energy of 9.89% based on the application of FERC’s proposed methodology. The FERC trial staff’s direct and answering testimony noted that an authorized return on equity of 9.89% for the first refund period was within the range of presumptively just and reasonable returns on equity for the second refund period, as calculated using a study period ending January 31, 2019 for the second refund period.

In June 2019, System Energy filed testimony responding to the testimony filed by the FERC trial staff. Among other things, System Energy’s testimony rebutted arguments raised by the FERC trial staff and provided updated calculations for the second refund period based on the study period ending May 31, 2019. For that refund period, System Energy’s testimony shows that strict application of the return on equity methodology proposed by the FERC staff indicates that the second complaint would not be dismissed, and the new return on equity would be set at 9.65% (median) or 9.74% (midpoint). System Energy’s testimony argues that these results are insufficient in light of benchmarks such as state returns on equity and treasury bond yields, and instead proposes that the calculated returns on equity for the second period should be either 9.91% (median) or 10.3% (midpoint). System Energy’s testimony also argues that, under application of its proposed modified methodology, the 10.10% return on equity calculated for the first refund period would fall within the range of presumptively just and reasonable returns on equity for the second refund period.

Also in June 2019, the FERC’s Chief ALJ issued an order terminating settlement discussions in the amended complaint addressing System Energy’s capital structure. The ALJ consolidated the amended capital structure complaint with the ongoing return on equity proceeding and set new procedural deadlines for the consolidated hearing.

In August 2019 the LPSC and the APSC and MPSC filed rebuttal testimony in the return on equity proceeding and direct and answering testimony relating to System Energy’s capital structure. The LPSC re-argues for an authorized return on equity for System Energy of 7.81% for the first refund period and 7.97% for the second refund period. The APSC and MPSC argue for an authorized return on equity for System Energy of 8.26% for the first refund period and 8.32% for the second refund period. With respect to capital structure, the LPSC proposes that the FERC establish a hypothetical capital structure for System Energy for ratemaking purposes. Specifically, the LPSC proposes that System Energy’s common equity ratio be set to Entergy Corporation’s equity ratio of 37%
equity and 63% debt. In the alternative, the LPSC argues that the equity ratio should be no higher than 49%, the composite equity ratio of System Energy and the other Entergy operating companies who purchase under the Unit Power Sales Agreement. The APSC and MPSC recommend that 35.98% be set as the common equity ratio for System Energy. As an alternative, the APSC and MPSC propose that System Energy’s common equity be set at 46.75% based on the median equity ratio of the proxy group for setting the return on equity.

In September 2019 the FERC trial staff filed its rebuttal testimony in the return on equity proceeding. For the first refund period, the FERC trial staff calculates an authorized return on equity for System Energy of 9.40% based on the application of the FERC’s proposed methodology and an updated proxy group. For the second refund period, based on the study period ending May 31, 2019, the FERC trial staff rebuttal testimony argues for a return on equity of 9.63%. In September 2019 the FERC trial staff also filed direct and answering testimony relating to System Energy’s capital structure. The FERC trial staff argues that the average capital structure of the proxy group used to develop System Energy’s return on equity should be used to establish the capital structure. Using this approach, the FERC trial staff calculates the average capital structure for its proposed proxy group of 46.74% common equity, and 53.26% debt.

In October 2019, System Energy filed answering testimony disputing the FERC trial staff’s, the LPSC’s, and the APSC’s and MPSC’s arguments for the use of a hypothetical capital structure and arguing that the use of System Energy’s actual capital structure is just and reasonable.

In November 2019, in a proceeding that did not involve System Energy, the FERC issued an order addressing the methodology for determining the return on equity applicable to transmission owners in MISO. Thereafter, the procedural schedule in the System Energy proceeding was amended to allow the participants to file supplemental testimony addressing the order in the MISO transmission owner proceeding (Opinion No. 569).

In February 2020 the LPSC, the MPSC and APSC, and the FERC trial staff filed supplemental testimony addressing Opinion No. 569 and how it would affect the return on equity evaluation for the two complaint periods concerning System Energy. For the first refund period, based on their respective interpretations and applications of the Opinion No. 569 methodology, the LPSC argues for an authorized return on equity for System Energy of 8.44%; the MPSC and APSC argue for an authorized return on equity of 8.41%; and the FERC trial staff argues for an authorized return on equity of 9.22%. For the second refund period and on a prospective basis, based on their respective interpretations and applications of the Opinion No. 569 methodology, the LPSC argues for an authorized return on equity for System Energy of 7.89%; the MPSC and APSC argue that an authorized return on equity of 8.01% may be appropriate; and the FERC trial staff argues for an authorized return on equity of 8.66%.

In April 2020, System Energy filed supplemental answering testimony addressing Opinion No. 569. System Energy argues that the Opinion No. 569 methodology is conceptually and analytically defective for purposes of establishing just and reasonable authorized return on equity determinations and proposes an alternative approach. As its primary recommendation, System Energy continues to support the return on equity determinations in its March 2019 testimony for the first refund period and its June 2019 testimony for the second refund period. Under the Opinion No. 569 methodology, System Energy calculates a “presumptively just and reasonable range” for the authorized return on equity for the first refund period of 8.57% to 9.52%, and for the second refund period of 8.28% to 9.11%. System Energy argues that these ranges are not just and reasonable results. Under its proposed alternative methodology, System Energy calculates an authorized return on equity of 10.26% for the first refund period, which also falls within the presumptively just and reasonable range calculated for the second refund period and prospectively.

In May 2020 the FERC issued an order on rehearing of Opinion No. 569 (Opinion No. 569-A). In June 2020 the procedural schedule in the System Energy proceeding was further revised in order to allow parties to address the Opinion No. 569-A methodology. Pursuant to the revised schedule, in June 2020, the LPSC, MPSC and APSC, and the FERC trial staff filed supplemental testimony addressing Opinion No. 569-A and how it would affect the return on equity evaluation for the two complaint periods concerning System Energy. For the first refund
period, based on their respective interpretations and applications of the Opinion No. 569-A methodology, the LPSC argues for an authorized return on equity for System Energy of 7.97%; the MPSC and APSC argue for an authorized return on equity of 9.24%; and the FERC trial staff argues for an authorized return on equity of 9.49%. For the second refund period and on a prospective basis, based on their respective interpretations and applications of the Opinion No. 569-A methodology, the LPSC argues for an authorized return on equity for System Energy of 7.78%; the MPSC and APSC argue that an authorized return on equity of 9.15% may be appropriate if the second complaint is not dismissed; and the FERC trial staff argues for an authorized return on equity of 9.09% if the second complaint is not dismissed.

Pursuant to the revised procedural schedule, in July 2020, System Energy filed supplemental testimony addressing Opinion No. 569-A. System Energy argues that strict application of the Opinion No. 569-A methodology produces results inconsistent with investor requirements and does not provide a sound basis on which to evaluate System Energy’s authorized return on equity. As its primary recommendation, System Energy argues for the use of a methodology that incorporates four separate financial models, including the constant growth form of the discounted cash flow model and the empirical capital asset pricing model. Based on application of its recommended methodology, System Energy argues for an authorized return on equity of 10.12% for the first refund period, which also falls within the presumptively just and reasonable range calculated for the second refund period and prospectively. Under the Opinion No. 569-A methodology, System Energy calculates an authorized return on equity of 9.44% for the first refund period, which also falls within the presumptively just and reasonable range calculated for the second refund period and prospectively.

The parties and FERC trial staff filed final rounds of testimony in August 2020. The hearing before a FERC ALJ occurred in late-September through early-October 2020, post-hearing briefing took place in November and December 2020.

In March 2021 the FERC ALJ issued an initial decision. With regard to System Energy’s authorized return on equity, the ALJ determined that the existing return on equity of 10.94% is no longer just and reasonable, and that the replacement authorized return on equity, based on application of the Opinion No. 569-A methodology, should be 9.32%. The ALJ further determined that System Energy should pay refunds for a fifteen-month refund period (January 2017-April 2018) based on the difference between the current return on equity and the replacement authorized return on equity. The ALJ determined that the April 2018 complaint concerning the authorized return on equity should be dismissed, and that no refunds for a second fifteen-month refund period should be due. With regard to System Energy’s capital structure, the ALJ determined that System Energy’s actual equity ratio is excessive and that the just and reasonable equity ratio is 48.15% equity, based on the average equity ratio of the proxy group used to evaluate the return on equity for the second complaint. The ALJ further determined that System Energy should pay refunds for a fifteen-month refund period (September 2018-December 2019) based on the difference between the actual equity ratio and the 48.15% equity ratio. If the ALJ’s initial decision is upheld, the estimated refund for this proceeding is approximately $60 million, which includes interest through December 31, 2021, and the estimated resulting annual rate reduction would be approximately $45 million. The estimated refund will continue to accrue interest until a final FERC decision is issued. Based on the course of the proceeding to date, System Energy has recorded a provision of $37 million, including interest, as of December 31, 2021.

The ALJ initial decision is an interim step in the FERC litigation process, and an ALJ’s determinations made in an initial decision are not controlling on the FERC. In April 2021, System Energy filed its brief on exceptions, in which it challenged the initial decision’s findings on both the return on equity and capital structure issues. Also in April 2021 the LPSC, APSC, MPSC, City Council, and the FERC trial staff filed briefs on exceptions. Reply briefs opposing exceptions were filed in May 2021 by System Energy, the FERC trial staff, the LPSC, APSC, MPSC, and the City Council. Refunds, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.
Grand Gulf Sale-leaseback Renewal Complaint and Uncertain Tax Position Rate Base Issue

In May 2018 the LPSC filed a complaint against System Energy and Entergy Services related to System Energy’s renewal of a sale-leaseback transaction originally entered into in December 1988 for an 11.5% undivided interest in Grand Gulf Unit 1. The complaint alleges that System Energy violated the filed rate and the FERC’s ratemaking and accounting requirements when it included in Unit Power Sales Agreement billings the cost of capital additions associated with the sale-leaseback interest, and that System Energy is double-recovering costs by including both the lease payments and the capital additions in Unit Power Sales Agreement billings. The complaint also claims that System Energy was imprudent in entering into the sale-leaseback renewal because the Utility operating companies that purchase Grand Gulf’s output from System Energy could have obtained cheaper capacity and energy in the MISO markets. The complaint further alleges that System Energy violated various other reporting and accounting requirements and should have sought prior FERC approval of the lease renewal. The complaint seeks various forms of relief from the FERC. The complaint seeks refunds for capital addition costs for all years in which they were recorded in allegedly non-formula accounts or, alternatively, the disallowance of the return on equity for the capital additions in those years plus interest. The complaint also asks that the FERC disallow and refund the lease costs of the sale-leaseback renewal on grounds of imprudence, investigate System Energy’s treatment of a DOE litigation payment, and impose certain forward-looking procedural protections, including audit rights for retail regulators of the Unit Power Sales Agreement formula rates. The APSC, MPSC, and City Council intervened in the proceeding.

In June 2018, System Energy and Entergy Services filed a motion to dismiss and an answer to the LPSC complaint denying that System Energy’s treatment of the sale-leaseback renewal and capital additions violated the terms of the filed rate or any other FERC ratemaking, accounting, or legal requirements or otherwise constituted double recovery. The response also argued that the complaint is inconsistent with a FERC-approved settlement to which the LPSC is a party and that explicitly authorizes System Energy to recover its lease payments. Finally, the response argued that both the capital additions and the sale-leaseback renewal were prudent investments and the LPSC complaint fails to justify any disallowance or refunds. The response also offered to submit formula rate protocols for the Unit Power Sales Agreement similar to the procedures used for reviewing transmission rates under the MISO tariff. In September 2018 the FERC issued an order setting the complaint for hearing and settlement proceedings. The FERC established a refund effective date of May 18, 2018.

In February 2019 the presiding ALJ ruled that the hearing ordered by the FERC includes the issue of whether specific subcategories of accumulated deferred income tax should be included in, or excluded from, System Energy’s formula rate. In March 2019 the LPSC, MPSC, APSC and City Council filed direct testimony. The LPSC testimony sought refunds that include the renewal lease payments (approximately $17.2 million per year since July 2015), rate base reductions for accumulated deferred income tax associated with uncertain tax positions, and the cost of capital additions associated with the sale-leaseback interest, as well as interest on those amounts.

In June 2019 System Energy filed answering testimony arguing that the FERC should reject all claims for refunds.  Among other things, System Energy argued that claims for refunds of the costs of lease renewal payments and capital additions should be rejected because those costs were recovered consistent with the Unit Power Sales Agreement formula rate, System Energy was not over or double recovering any costs, and ratepayers will save costs over the initial and renewal terms of the leases.  System Energy argued that claims for refunds associated with liabilities arising from uncertain tax positions should be rejected because the liabilities do not provide cost-free capital, the repayment timing of the liabilities is uncertain, and the outcome of the underlying tax positions is uncertain.  System Energy’s testimony also challenged the refund calculations supplied by the other parties.

In August 2019 the FERC trial staff filed direct and answering testimony seeking refunds for rate base reductions for liabilities associated with uncertain tax positions. The FERC trial staff also argued that System Energy recovered $32 million more than it should have in depreciation expense for capital additions. In September 2019, System Energy filed cross-answering testimony disputing the FERC trial staff’s arguments for refunds, stating that the FERC trial staff’s position regarding depreciation rates for capital additions is not unreasonable, but
explaining that any change in depreciation expense is only one element of a Unit Power Sales Agreement re-billing calculation. Adjustments to depreciation expense in any re-billing under the Unit Power Sales Agreement formula rate will also involve changes to accumulated depreciation, accumulated deferred income taxes, and other formula elements as needed. In October 2019 the LPSC filed rebuttal testimony increasing the amount of refunds sought for liabilities associated with uncertain tax positions.  The LPSC seeks approximately $512 million plus interest, which is approximately $216 million through December 31, 2021.  The FERC trial staff also filed rebuttal testimony in which it seeks refunds of a similar amount as the LPSC for the liabilities associated with uncertain tax positions.  The LPSC testimony also argued that adjustments to depreciation rates should affect rate base on a prospective basis only.

A hearing was held before a FERC ALJ in November 2019. In April 2020 the ALJ issued the initial decision. Among other things, the ALJ determined that refunds were due on three main issues. First, with regard to the lease renewal payments, the ALJ determined that System Energy is recovering an unjust acquisition premium through the lease renewal payments, and that System Energy’s recovery from customers through rates should be limited to the cost of service based on the remaining net book value of the leased assets, which is approximately $70 million. The ALJ found that the remedy for this issue should be the refund of lease payments (approximately $17.2 million per year since July 2015) with interest determined at the FERC quarterly interest rate, which would be offset by the addition of the net book value of the leased assets in the cost of service. The ALJ did not calculate a value for the refund expected as a result of this remedy. In addition, System Energy would no longer recover the lease payments in rates prospectively. Second, with regard to the liabilities associated with uncertain tax positions, the ALJ determined that the liabilities are accumulated deferred income taxes and that System Energy’s rate base should have been reduced for those liabilities. If the ALJ’s initial decision is upheld, the estimated refund for this issue through December 31, 2021, is approximately $422 million, plus interest, which is approximately $128 million through December 31, 2021. The ALJ also found that System Energy should include liabilities associated with uncertain tax positions as a rate base reduction going forward. Third, with regard to the depreciation expense adjustments, the ALJ found that System Energy should correct for the error in re-billings retroactively and prospectively, but that System Energy should not be permitted to recover interest on any retroactive return on enhanced rate base resulting from such corrections. If the initial decision is affirmed on this issue, System Energy estimates refunds of approximately $19 million, which includes interest through December 31, 2021.

The ALJ initial decision is an interim step in the FERC litigation process, and an ALJ’s determinations made in an initial decision are not controlling on the FERC. The ALJ in the initial decision acknowledges that these are issues of first impression before the FERC. In June 2020, System Energy, the LPSC, and the FERC trial staff filed briefs on exceptions, challenging several of the initial decision’s findings. System Energy’s brief on exceptions challenged the initial decision’s limitations on recovery of the lease renewal payments, its proposed rate base refund for the liabilities associated with uncertain tax positions, and its proposal to asymmetrically treat interest on bill corrections for depreciation expense adjustments. The LPSC’s and the FERC trial staff’s briefs on exceptions each challenged the initial decision’s allowance for recovery of the cost of service associated with the lease renewal based on the remaining net book value of the leased assets, its calculation of the remaining net book value of the leased assets, and the amount of the initial decision’s proposed rate base refund for the liabilities associated with uncertain tax positions. The LPSC’s brief on exceptions also challenged the initial decision’s proposal that depreciation expense adjustments include retroactive adjustments to rate base and its finding that section 203 of the Federal Power Act did not apply to the lease renewal. The FERC trial staff’s brief on exceptions also challenged the initial decision’s finding that the FERC need not institute a formal investigation into System Energy’s tariff. In October 2020, System Energy, the LPSC, the MPSC, the APSC, and the City Council filed briefs opposing exceptions. System Energy opposed the exceptions filed by the LPSC and the FERC trial staff. The LPSC, MPSC, APSC, City Council, and the FERC trial staff opposed the exceptions filed by System Energy. Also in October 2020 the MPSC, APSC, and the City Council filed briefs adopting the exceptions of the LPSC and the FERC trial staff. The case is pending before the FERC, which will review the case and issue an order on the proceeding, and the FERC may accept, reject, or modify the ALJ’s initial decision in whole or in part. Refunds, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.
In addition, in September 2020, the IRS issued a Notice of Proposed Adjustment (NOPA) and Entergy executed it. The NOPA memorializes the IRS’s decision to adjust the 2015 consolidated federal income tax return of Entergy Corporation and certain of its subsidiaries, including System Energy, with regard to the uncertain decommissioning tax position. Pursuant to the audit resolution documented in the NOPA, the IRS allowed System Energy’s inclusion of $102 million of future nuclear decommissioning costs in System Energy’s cost of goods sold for the 2015 tax year, roughly 10% of the requested deduction, but disallowed the balance of the position. In September 2020, System Energy filed a motion to lodge the NOPA into the record in the FERC proceeding. In October 2020 the LPSC, the APSC, the MPSC, the City Council, and the FERC trial staff filed oppositions to System Energy’s motion. As a result of the NOPA issued by the IRS in September 2020, System Energy filed, in October 2020, a new Federal Power Act section 205 filing at FERC to establish an ongoing rate base credit for the accumulated deferred income taxes resulting from the decommissioning uncertain tax position. On a prospective basis beginning with the October 2020 bill, System Energy proposes to include the accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position as a credit to rate base under the Unit Power Sales Agreement. In November 2020 the LPSC, APSC, MPSC, and City Council filed a protest to the filing, and System Energy responded.

In November 2020 the IRS issued a Revenue Agent’s Report (RAR) for the 2014/2015 tax year and in December 2020 Entergy executed it. The RAR contained the same adjustment to the uncertain nuclear decommissioning tax position as that which the IRS had announced in the NOPA. In December 2020, System Energy filed a motion to lodge the RAR into the record in the FERC proceeding addressing the uncertain tax position rate base issue. In January 2021 the LPSC, APSC, MPSC, and City Council filed a protest to the motion.

As a result of the RAR, in December 2020, System Energy filed amendments to its new Federal Power Act section 205 filings to establish an ongoing rate base credit for the accumulated deferred income taxes resulting from the decommissioning uncertain tax position and to credit excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position. The amendments both propose the inclusion of the RAR as support for the filings. In December 2020 the LPSC, APSC, and City Council filed a protest in response to the amendments, reiterating their prior objections to the filings. In February 2021 the FERC issued an order accepting System Energy’s Federal Power Act section 205 filings subject to refund, setting them for hearing, and holding the hearing in abeyance.

In December 2020, System Energy filed a new Federal Power Act section 205 filing to provide a one-time, historical credit of $25.2 million for the accumulated deferred income taxes that would have been created by the decommissioning uncertain tax position if the IRS’s decision had been known in 2016. In January 2021 the LPSC, APSC, MPSC, and City Council filed a protest to the filing. In February 2021 the FERC issued an order accepting System Energy’s Federal Power Act section 205 filing subject to refund, setting it for hearing, and holding the hearing in abeyance. The one-time credit was made during the first quarter 2021.

LPSC Authorization of Additional Complaints

In May 2020 the LPSC authorized its staff to file additional complaints at the FERC related to the rates charged by System Energy for Grand Gulf energy and capacity supplied to Entergy Louisiana under the Unit Power Sales Agreement. The LPSC directive notes that the initial decision issued by the presiding ALJ in the Grand Gulf sale-leaseback complaint proceeding did not address, for procedural reasons, certain rate issues raised by the LPSC and declined to order further investigation of rates charged by System Energy. The LPSC directive authorizes its staff to file complaints at the FERC “necessary to address these rate issues, to request a full investigation into the rates charged by System Energy for Grand Gulf power, and to seek rate refund, rate reduction, and such other remedies as may be necessary and appropriate to protect Louisiana ratepayers.” The LPSC directive further stated that the LPSC has seen “information suggesting that the Grand Gulf plant has been significantly underperforming compared to other nuclear plants in the United States, has had several extended and unexplained outages, and has been plagued with serious safety concerns.” The LPSC expressed concern that the costs paid by Entergy
Louisiana's retail customers may have been detrimentally impacted, and authorized “the filing of a FERC complaint to address these performance issues and to seek appropriate refund, rate reduction, and other remedies as may be appropriate.”

Unit Power Sales Agreement Complaint

The first of the additional complaints was filed by the LPSC, the APSC, the MPSC, and the City Council in September 2020. The complaint raises two sets of rate allegations: violations of the filed rate and a corresponding request for refunds for prior periods; and elements of the Unit Power Sales Agreement are unjust and unreasonable and a corresponding request for refunds for the 15-month refund period and changes to the Unit Power Sales Agreement prospectively. Several of the filed rate allegations overlap with the previous complaints. The filed rate allegations not previously raised are that System Energy: failed to provide a rate base credit to customers for the “time value” of sale-leaseback lease payments collected from customers in advance of the time those payments were due to the owner-lessors; improperly included certain lease refinancing costs in rate base as prepayments; improperly included nuclear decommissioning outage costs in rate base; failed to include categories of accumulated deferred income taxes as a reduction to rate base; charged customers based on a higher equity ratio than would be appropriate due to excessive retained earnings; and did not correctly reflect money pool investments and imprudently invested cash into the money pool. The elements of the Unit Power Sales Agreement that the complaint alleges are unjust and unreasonable include: incentive and executive compensation, lack of an equity re-opener, lobbying, and private airplane travel. The complaint also requests a rate investigation into the Unit Power Sales Agreement and System Energy’s billing practices pursuant to section 206 of the Federal Power Act, including any issue relevant to the Unit Power Sales Agreement and its inputs. System Energy filed its answer opposing the complaint in November 2020. In its answer, System Energy argued that all of the claims raised in the complaint should be dismissed and agreed that bill adjustment with respect to two discrete issues were justified. System Energy argued that dismissal is warranted because all claims fall into one or more of the following categories: the claims have been raised and are being litigated in another proceeding; the claims do not present a prima facie case and do not satisfy the threshold burden to establish a complaint proceeding; the claims are premised on a theory or request relief that is incompatible with federal law or FERC policy; the claims request relief that is inconsistent with the filed rate; the claims are barred or waived by the legal doctrine of laches; and/or the claims have been fully addressed and do not warrant further litigation. In December 2020, System Energy filed a bill adjustment report indicating that $3.4 million had been credited to customers in connection with the two discrete issues concerning the inclusion of certain accumulated deferred income taxes balances in rates. In January 2021 the complainants filed a response to System Energy’s November 2020 answer, and in February 2021, System Energy filed a response to the complainant’s response.

In May 2021 the FERC issued an order addressing the complaint, establishing a refund effective date of September 21, 2020, establishing hearing procedures, and holding those procedures in abeyance pending FERC’s review of the initial decision in the Grand Gulf sale-leaseback renewal complaint discussed above. System Energy agreed that the hearing should be held in abeyance but sought rehearing of FERC’s decision as related to matters set for hearing that were beyond the scope of FERC’s jurisdiction or authority. The complainants sought rehearing of FERC’s decision to hold the hearing in abeyance and filed a motion to proceed, which motion System Energy subsequently opposed. In June 2021, System Energy’s request for rehearing was denied by operation of law, and System Energy filed an appeal of FERC’s orders in the Court of Appeals for the Fifth Circuit. The appeal was initially stayed for a period of 90 days, but the stay expired. In November 2021 the Fifth Circuit dismissed the appeal as premature.

In August 2021 the FERC issued an order addressing System Energy’s and the complainants’ rehearing requests. The FERC dismissed part of the complaint seeking an equity re-opener, maintained the abeyance for issues related to the proceeding addressing the sale-leaseback renewal and uncertain tax positions, lifted the abeyance for issues unrelated to that proceeding, and clarified the scope of the hearing. A procedural schedule was established, with the hearing scheduled for June 2022 and the ALJ’s initial decision scheduled for November 2022. Discovery is ongoing.
In November 2021 the LPSC, APSC, and City Council filed direct testimony and requested the FERC to order refunds for prior periods and prospective amendments to the Unit Power Sales Agreement. The LPSC’s refund claims include, among other things, allegations that: (1) System Energy should not have included certain sale-leaseback transaction costs in prepayments; (2) System Energy should have credited rate base to reflect the time value of money associated with the advance collection of lease payments; (3) System Energy incorrectly included refueling outage costs that were recorded in account 174 in rate base; and (4) System Energy should have excluded several accumulated deferred income tax balances in account 190 from rate base. The LPSC is also seeking a retroactive adjustment to retained earnings and capital structure in conjunction with the implementation of its proposed refunds. In addition, the LPSC seeks amendments to the Unit Power Sales Agreement going forward to address below-the-line costs, incentive compensation, the working capital allowance, litigation expenses, and the 2019 termination of the capital funds agreement. The APSC argues that: (1) System Energy should have included borrowings from the Entergy System money pool in its determination of short-term debt in its cost of capital; and (2) System Energy should credit customers with System Energy’s allocation of earnings on money pool investments. The City Council alleges that System Energy has maintained excess cash on hand in the money pool and that retention of excess cash was imprudent. Based on this allegation, the City Council’s witness recommends a refund of approximately $98.8 million for the period 2004-September 2021 or other alternative relief. The City Council further recommends that the FERC impose a hypothetical equity ratio such as 48.15% equity to capital on a prospective basis.

In January 2022, System Energy filed answering testimony arguing that the FERC should not order refunds for prior periods or any prospective amendments to the Unit Power Sales Agreement. In response to the LPSC’s refund claims, System Energy argues, among other things, that (1) the inclusion of sale-leaseback transaction costs in prepayments was correct; (2) that the filed rate doctrine bars the request for a retroactive credit to rate base for the time value of money associated with the advance collection of lease payments; (3) that an accounting misclassification for deferred refueling outage costs has been corrected, caused no harm to customers, and requires no refunds; and (4) that its accounting and ratemaking treatment of specified accumulated deferred income tax balances in account 190 has been correct. System Energy further responds that no retroactive adjustment to retained earnings or capital structure should be ordered because there is no general policy requiring such a remedy and there was no showing that the retained earnings element of the capital structure was incorrectly implemented. Further, System Energy presented evidence that all of the costs that are being challenged were long known to the retail regulators and were approved by them for inclusion in retail rates, and the attempt to retroactively challenge these costs, some of which have been included in rates for decades, is unjust and unreasonable. In response to the LPSC’s proposed going-forward adjustments, System Energy presents evidence to show that none of the proposed adjustments are needed. On the issue of below-the-line expenses, during discovery procedures System Energy identified a historical allocation error in certain months and agreed to provide a bill credit to customers to correct the error. In response to the APSC’s claims, System Energy argues that the Unit Power Sales Agreement does not include System Energy’s borrowings from the Entergy System money pool or earnings on deposits to the Entergy System money pool in the determination of the cost of capital; and accordingly, no refunds are appropriate on those issues. In response to the City Council’s claims, System Energy argues that it has reasonably managed its cash and that the City Council’s theory of cash management is defective because it fails to adequately consider the relevant cash needs of System Energy and it makes faulty presumptions about the operation of the Entergy System money pool. System Energy further points out that the issue of its capital structure is already subject to pending FERC litigation.

Grand Gulf Prudence Complaint

The second of the additional complaints was filed at the FERC in March 2021 by the LPSC, the APSC, and the City Council against System Energy, Entergy Services, Entergy Operations, and Entergy Corporation. The second complaint contains two primary allegations. First, it alleges that, based on the plant’s capacity factor and alleged safety performance, System Energy and the other respondents imprudently operated Grand Gulf during the period 2016-2020, and it seeks refunds of at least $360 million in alleged replacement energy costs, in addition to other costs, including those that can only be identified upon further investigation. Second, it alleges that the
performance and/or management of the 2012 extended power uprate of Grand Gulf was imprudent, and it seeks refunds of all costs of the 2012 uprate that are determined to result from imprudent planning or management of the project. In addition to the requested refunds, the complaint asks that the FERC modify the Unit Power Sales Agreement to provide for full cost recovery only if certain performance indicators are met and to require pre-authorization of capital improvement projects in excess of $125 million before related costs may be passed through to customers in rates. In April 2021, System Energy and the other respondents filed their motion to dismiss and answer to the complaint. System Energy requested that the FERC dismiss the claims within the complaint. With respect to the claim concerning operations, System Energy argues that the complaint does not meet its legal burden because, among other reasons, it fails to allege any specific imprudent conduct. With respect to the claim concerning the uprate, System Energy argues that the complaint fails because, among other reasons, the complainants’ own conduct prevents them from raising a serious doubt as to the prudence of the uprate. System Energy also requests that the FERC dismiss other elements of the complaint, including the proposed modifications to the Unit Power Sales Agreement, because they are not warranted. Additional responsive pleadings were filed by the complainants and System Energy during the period from March through July 2021. The pleadings are pending FERC action.
Storm Cost Recovery Filings with Retail Regulators

Entergy Louisiana

Hurricane Laura, Hurricane Delta, Hurricane Zeta, Winter Storm Uri, and Hurricane Ida

In August 2020 and October 2020, Hurricane Laura, Hurricane Delta, and Hurricane Zeta caused significant damage to portions of Entergy Louisiana’s service area. The storms resulted in widespread outages, significant damage to distribution and transmission infrastructure, and the loss of sales during the outages. Additionally, as a result of Hurricane Laura’s extensive damage to the grid infrastructure serving the impacted area, large portions of the underlying transmission system required nearly a complete rebuild.

In October 2020, Entergy Louisiana filed an application at the LPSC seeking approval of certain ratemaking adjustments in connection with the issuance of shorter-term mortgage bonds to provide interim financing for restoration costs associated with Hurricane Laura, Hurricane Delta, and Hurricane Zeta. Subsequently, Entergy Louisiana and the LPSC staff filed a joint motion seeking approval to exclude from the derivation of Entergy Louisiana’s capital structure and cost rate of debt for ratemaking purposes, including the allowance for funds used during construction, shorter-term debt up to $1.1 billion issued by Entergy Louisiana to fund costs associated with Hurricane Laura, Hurricane Delta, and Hurricane Zeta costs on an interim basis. In November 2020 the LPSC issued an order approving the joint motion, and Entergy Louisiana issued $1.1 billion of 0.62% Series mortgage bonds due November 2023. Also in November 2020, Entergy Louisiana withdrew $257 million from its funded storm reserves.

In February 2021 two winter storms (collectively, Winter Storm Uri) brought freezing rain and ice to Louisiana. Ice accumulation sagged or downed trees, limbs and power lines, causing damage to Entergy Louisiana’s transmission and distribution systems. The additional weight of ice caused trees and limbs to fall into power lines and other electric equipment. When the ice melted, it affected vegetation and electrical equipment, causing additional outages. As discussed above in “Fuel and purchased power recovery,” Entergy Louisiana recovered the incremental fuel costs associated with Winter Storm Uri over a five-month period from April 2021 through August 2021.

In April 2021, Entergy Louisiana filed an application with the LPSC relating to Hurricane Laura, Hurricane Delta, Hurricane Zeta, and Winter Storm Uri restoration costs and in July 2021, Entergy Louisiana made a supplemental filing updating the total restoration costs. Total restoration costs for the repair and/or replacement of Entergy Louisiana’s electric facilities damaged by these storms are currently estimated to be approximately $2.06 billion, including approximately $1.68 billion in capital costs and approximately $380 million in non-capital
costs. Including carrying costs through January 2022, Entergy Louisiana is seeking an LPSC determination that $2.11 billion was prudently incurred and, therefore, is eligible for recovery from customers. Additionally, Entergy Louisiana is requesting that the LPSC determine that re-establishment of a storm escrow account to the previously authorized amount of $290 million is appropriate. In July 2021, Entergy Louisiana supplemented the application with a request regarding the financing and recovery of the recoverable storm restoration costs. Specifically, Entergy Louisiana requested approval to securitize its restoration costs pursuant to Louisiana Act 55 financing, as supplemented by Act 293 of the Louisiana Legislature’s Regular Session of 2021. As previously discussed, in August 2021, Hurricane Ida caused extensive damage to Entergy Louisiana’s distribution and, to a lesser extent, transmission systems resulting in widespread power outages. In September 2021, Entergy Louisiana supplemented the application with a request to establish and securitize a $1 billion restricted storm escrow account for Hurricane Ida related restoration costs, subject to a subsequent prudence review. In total, Entergy Louisiana requested authorization for the issuance of system restoration bonds in one or more series in an aggregate principal amount of $3.18 billion, which includes the costs of re-establishing and funding a storm damage escrow account, carrying costs and unamortized debt costs on interim financing, and issuance costs. After filing of testimony by LPSC staff and intervenors, which generally supported or did not oppose Entergy Louisiana’s requests, the parties negotiated and executed an uncontested stipulated settlement which was filed with the LPSC in February 2022. The settlement agreement contains the following key terms: $2.1 billion of restoration costs from Hurricane Laura, Hurricane Delta, Hurricane Zeta, and Winter Storm Uri were prudently incurred and are eligible for recovery; carrying costs of $51 million are recoverable; a $290 million cash storm reserve should be re-established; a $1 billion reserve should be established to partially pay for Hurricane Ida restoration costs; and Entergy Louisiana is authorized to finance $3.186 billion utilizing the securitization process authorized by Act 55, as supplemented by Act 293. The LPSC voted to approve the settlement at its February 2022 meeting.

Hurricane Isaac

In August 2012, Hurricane Isaac caused extensive damage to Entergy Louisiana’s service area.  In June 2014 the LPSC authorized Entergy Louisiana to utilize Louisiana Act 55 financing for Hurricane Isaac system restoration costs.  Entergy Louisiana committed to pass on to customers a minimum of $30.8 million of customer benefits through annual customer credits of approximately $6.2 million for five years. Approvals for the Act 55 financings were obtained from the Louisiana Utilities Restoration Corporation (LURC) and the Louisiana State Bond Commission.

In August 2014 the Louisiana Local Government Environmental Facilities and Community Development Authority (LCDA) issued $314.85 million in bonds under Louisiana Act 55.  From the $309 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $16 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $293 million directly to Entergy Louisiana.  Entergy Louisiana used the $293 million received from the LURC to acquire 2,935,152.69 Class C preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 7.5% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2014, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement. The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1.75 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

In the first quarter 2020, Entergy and the IRS agreed upon and settled on the treatment of funds received by Entergy Louisiana in conjunction with the Act 55 financing of Hurricane Isaac storm costs, which resulted in a net reduction of income tax expense of approximately $32 million. As a result of the settlement, the position was
partially sustained and Entergy Louisiana recorded a reduction of income tax expense of approximately $58 million primarily due to the reversal of liabilities for uncertain tax positions in excess of the agreed-upon settlement. Entergy recorded an increase to income tax expense of $26 million primarily resulting from the reduction of the deferred tax asset, associated with utilization of the net operating loss as a result of the settlement. This adjustment recorded by Entergy also accounted for the tax rate change of the Tax Cuts and Jobs Act. As a result of the IRS settlement, Entergy Louisiana recorded a $29 million ($21 million net-of-tax) regulatory charge and a corresponding regulatory liability to reflect its obligation to customers pursuant to the LPSC Hurricane Isaac Act 55 financing order.

Hurricane Gustav and Hurricane Ike

In September 2008, Hurricane Gustav and Hurricane Ike caused catastrophic damage to Entergy Louisiana’s service territory.  In December 2009, Entergy Louisiana entered into a stipulation agreement with the LPSC staff regarding its storm costs.  In March and April 2010, Entergy Louisiana and other parties to the proceeding filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal to utilize Act 55 financing, which included a commitment to pass on to customers a minimum of $43.3 million of customer benefits through a prospective annual rate reduction of $8.7 million for five years.  In April 2010 the LPSC approved the settlement and subsequently issued financing orders and a ratemaking order intended to facilitate the implementation of the Act 55 financings.  In June 2010 the Louisiana State Bond Commission approved the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricane Gustav and Hurricane Ike was reduced by $2.7 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2010 the LCDA issued two series of bonds totaling $713.0 million under Act 55.  From the $702.7 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $290 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $412.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana used $412.7 million to acquire 4,126,940.15 Class B preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 9% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2010, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA, and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

Hurricane Katrina and Hurricane Rita

In August and September 2005, Hurricanes Katrina and Rita caused catastrophic damage to Entergy Louisiana’s service territory. In March 2008, Entergy Louisiana and the LURC filed at the LPSC an application requesting that the LPSC grant a financing order authorizing the financing of Entergy Louisiana storm costs, storm reserves, and issuance costs pursuant to Louisiana Act 55.  Entergy Louisiana also filed an application requesting LPSC approval for ancillary issues including the mechanism to flow charges and savings to customers via a storm cost offset rider.  In April 2008 the Louisiana Public Facilities Authority (LPFA), which is the issuer of the bonds
pursuant to the Act 55 financing, approved requests for the Act 55 financing.  Also in April 2008, Entergy Louisiana and the LPSC staff filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal under the Act 55 financing, which included a commitment to pass on to customers a minimum of $40 million of customer benefits through a prospective annual rate reduction of $8 million for five years.  The LPSC subsequently approved the settlement and issued two financing orders and one ratemaking order intended to facilitate implementation of the Act 55 financing.  In May 2008 the Louisiana State Bond Commission granted final approval of the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricanes Katrina and Rita was reduced by $22.3 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2008 the LPFA issued $687.7 million in bonds under the aforementioned Act 55.  From the $679 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $152 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $527 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $545 million, including $17.8 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 5,449,861.85 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 10% annual distribution rate.  In August 2008 the LPFA issued $278.4 million in bonds under the aforementioned Act 55.  From the $274.7 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $87 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $187.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $189.4 million, including $1.7 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 1,893,918.39 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC that carry a 10% annual distribution rate.  Distributions are payable quarterly commencing on September 15, 2008 and have a liquidation price of $100 per unit.  The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.  

The bonds were repaid in 2018. Entergy and Entergy Louisiana did not report the bonds issued by the LPFA on their balance sheets because the bonds are the obligation of the LPFA, and there was no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collected a system restoration charge on behalf of the LURC and remitted the collections to the bond indenture trustee.  Entergy and Entergy Louisiana did not report the collections as revenue because Entergy Louisiana was merely acting as the billing and collection agent for the state.

Entergy Mississippi

Entergy Mississippi has approval from the MPSC to collect a storm damage provision of $1.75 million per month. If Entergy Mississippi’s accumulated storm damage provision balance exceeds $15 million, the collection of the storm damage provision ceases until such time that the accumulated storm damage provision becomes less than $10 million. Entergy Mississippi’s storm damage provision balance has been less than $10 million since May 2019, and Entergy Mississippi has been billing the monthly storm damage provision since July 2019.
Entergy New Orleans

Hurricane Zeta

In October 2020, Hurricane Zeta caused significant damage to Entergy New Orleans’s service area. The storm resulted in widespread power outages, significant damage to distribution and transmission infrastructure, and the loss of sales during the power outages. In March 2021, Entergy New Orleans withdrew $44 million from its funded storm reserves. In May 2021, Entergy New Orleans filed an application with the City Council requesting approval and certification that its system restoration costs associated with Hurricane Zeta of approximately $36 million, including approximately $28 million in capital costs and approximately $8 million in non-capital costs, were reasonable and necessary to enable Entergy New Orleans to restore electric service to its customers and Entergy New Orleans’s electric utility infrastructure.

Entergy Texas

Hurricane Laura, Hurricane Delta, and Winter Storm Uri

In August 2020 and October 2020, Hurricane Laura and Hurricane Delta caused extensive damage to Entergy Texas’s service area. In February 2021, Winter Storm Uri also caused damage to Entergy Texas’s service area. The storms resulted in widespread power outages, significant damage primarily to distribution and transmission infrastructure, and the loss of sales during the power outages. In April 2021, Entergy Texas filed an application with the PUCT requesting a determination that approximately $250 million of system restoration costs associated with Hurricane Laura, Hurricane Delta, and Winter Storm Uri, including approximately $200 million in capital costs and approximately $50 million in non-capital costs, were reasonable and necessary to enable Entergy Texas to restore electric service to its customers and Entergy Texas’s electric utility infrastructure. The filing also included the projected balance of approximately $13 million of a regulatory asset containing previously approved system restoration costs related to Hurricane Harvey. In September 2021 the parties filed an unopposed settlement agreement, pursuant to which Entergy Texas removed from the amount to be securitized approximately $4.3 million that will instead be charged to its storm reserve, $5 million related to no particular issue, of which Entergy Texas would be permitted to seek recovery in a future proceeding, and approximately $300 thousand related to attestation costs. In December 2021 the PUCT issued an order approving the unopposed settlement and determining system restoration costs of $243 million related to Hurricane Laura, Hurricane Delta, and Winter Storm Uri and the $13 million projected remaining balance of the Hurricane Harvey system restoration costs were eligible for securitization. The order also determines that Entergy Texas can recover carrying costs on the system restoration costs related to Hurricane Laura, Hurricane Delta, and Winter Storm Uri.

In July 2021, Entergy Texas filed with the PUCT an application for a financing order to approve the securitization of the system restoration costs that are the subject of the April 2021 application. In November 2021 the parties filed an unopposed settlement agreement supporting the issuance of a financing order consistent with Entergy Texas’s application and with minor adjustments to certain upfront and ongoing costs to be incurred to facilitate the issuance and serving of system restoration bonds. In January 2022 the PUCT issued a financing order consistent with the unopposed settlement.
Entergy Mississippi [Member]  
Rate And Regulatory Matters RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)
Regulatory Assets and Regulatory Liabilities

Regulatory assets represent probable future revenues associated with costs that Entergy expects to recover from customers through the regulatory ratemaking process under which the Utility business operates. Regulatory liabilities represent probable future reductions in revenues associated with amounts that Entergy expects to benefit customers through the regulatory ratemaking process under which the Utility business operates. In addition to the regulatory assets and liabilities that are specifically disclosed on the face of the balance sheets, the tables below provide detail of “Other regulatory assets” and “Other regulatory liabilities” that are included on Entergy’s and the Registrant Subsidiaries’ balance sheets as of December 31, 2021 and 2020:

Other Regulatory Assets

Entergy
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
$2,327.7 $3,027.5 
Removal costs (Note 9)
1,488.8 893.8 
Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 2 - Hurricane Ida and Storm Cost Recovery Filings with Retail Regulators and Note 5 - Securitization Bonds)
993.6 379.2 
Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
935.5 1,018.9 
Retired electric and gas meters - recovered through retail rates as determined by retail regulators
179.4 192.1 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
133.1 105.7 
Opportunity Sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding) (b)
131.8 131.8 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
113.2 16.9 
Unamortized loss on reacquired debt - recovered over term of debt
74.7 79.2 
Retail rate deferrals - recovered through formula rates or rate riders as rates are redetermined by retail regulators
66.1 66.0 
Attorney General litigation costs - recovered over a six-year period through March 2026 (b)
20.5 25.3 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
19.0 — 
New nuclear generation development costs - recovery through formula rate plan December 2014 through November 2022 (b)
6.8 14.2 
Other123.1 125.9 
Entergy Total$6,613.3 $6,076.5 
Entergy Arkansas
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
$640.0 $831.5 
Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
489.2 479.3 
Removal costs (Note 9)
224.3 212.6 
Opportunity sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding) (b)
131.8 131.8 
Retired electric meters - recovered over 15-year period through March 2034
43.4 46.9 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
39.8 9.5 
Storm damage costs - recovered either through securitization or retail rates (Note 5 - Entergy Arkansas Securitization Bonds)
39.3 42.7 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
32.6 10.5 
Unamortized loss on reacquired debt - recovered over term of debt
23.1 24.7 
ANO Fukushima and Flood Barrier costs - recovered through retail rates through February 2026 (Note 2 - Retail Rate Proceedings) (b)
7.3 9.1 
Retail rate deferrals - recovered through rate riders as rates are redetermined annually (b)
1.0 12.6 
Other17.9 21.2 
Entergy Arkansas Total$1,689.7 $1,832.4 
Entergy Louisiana
 20212020
 (In Millions)
Removal costs (Note 9)
$848.2 $302.5 
Storm damage costs, including hurricane costs - recovery expected through retail rates and securitization (Note 2 - Hurricane Ida and Storm Cost Recovery Filings with Retail Regulators)
773.6 94.0 
Pension & postretirement costs (Note 11 - Qualified Pension Plans and Non-Qualified Pension Plans) (a)
592.7 799.4 
Asset Retirement Obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
286.6 299.0 
Retired electric meters - recovered over a 22-year period through July 2041
91.7 96.4 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
56.3 48.8 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
55.0 5.4 
Unamortized loss on reacquired debt - recovered over term of debt
26.9 26.6 
New nuclear generation development costs - recovery through formula rate plan December 2014 through November 2022 (b)
6.7 14.0 
Other39.0 40.0 
Entergy Louisiana Total$2,776.7 $1,726.1 

Entergy Mississippi
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
$175.4 $242.7 
Removal costs (Note 9)
136.8 107.3 
Retail rate deferrals - returned through formula rates or rate riders as rates are redetermined annually
48.1 44.3 
Attorney General litigation costs - recovered over a six-year period through March 2026 (b)
20.5 25.3 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
19.0 — 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
15.0 19.2 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
13.8 2.0 
Unamortized loss on reacquired debt - recovered over term of debt
12.2 13.5 
Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
8.4 7.9 
Other13.2 5.1 
Entergy Mississippi Total$462.4 $467.3 
Entergy New Orleans
 20212020
 (In Millions)
Removal costs (Note 9)
$91.7 $63.2 
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
44.9 75.7 
Storm damage costs, including hurricane costs - recovered through securitization or retail rates (Note 2 - Storm Cost Recovery Filings with Retail Regulators and Note 5 - Entergy New Orleans Securitization Bonds - Hurricane Isaac)
31.2 55.2 
Retired meters - recovered over a 12-year period through July 2031 (b)
19.6 21.7 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
17.4 14.3 
Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
5.4 5.2 
Unamortized loss on reacquired debt - recovered over term of debt
1.6 1.9 
Other36.8 29.6 
Entergy New Orleans Total$248.6 $266.8 

Entergy Texas
 20212020
 (In Millions)
Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 2 - Storm Cost Recovery Filings with Retail Regulators and Note 5 - Entergy Texas Securitization Bonds - Hurricane Rita and Entergy Texas Securitization Bonds - Hurricane Ike and Hurricane Gustav)
$143.1 $187.3 
Removal costs (Note 9)
98.1 115.3 
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
96.0 140.1 
Retired electric meters - recovered over 13-year period through February 2032
23.7 26.0 
Neches and Sabine costs - recovered over a 10-year period through September 2028 (Note 2 - Retail Rate Proceedings)
16.4 18.8 
Pension & postretirement benefits expense deferral - recovery period to be determined (Note 11 - Entergy Texas Reserve)
14.6 3.8 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
11.7 12.9 
Unamortized loss on reacquired debt - recovered over term of debt
9.8 10.5 
Other7.9 10.0 
Entergy Texas Total$421.3 $524.7 
System Energy
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans and Other Postretirement Benefits) (a)
$160.3 $217.8 
Asset retirement obligation - recovery dependent upon timing of decommissioning (Note 9) (a)
144.4 226.3 
Removal costs - recovered through depreciation rates (Note 9)
89.7 92.9 
Unamortized loss on reacquired debt - recovered over term of debt
1.1 2.0 
System Energy Total$395.5 $539.0 

(a)Does not earn a return on investment, but is offset by related liabilities.
(b)Does not earn a return on investment.

Hurricane Ida

In August 2021, Hurricane Ida caused extensive damage to the Entergy distribution and, to a lesser extent, transmission systems across Louisiana resulting in widespread power outages. Total restoration costs for the repair and/or replacement of the electrical system damaged by Hurricane Ida for Entergy Louisiana and Entergy New Orleans are currently estimated to be approximately $2.7 billion. Also, Utility revenues in 2021 were adversely affected by extended power outages resulting from the hurricane.

Entergy has recorded accounts payable for the estimated costs incurred that were necessary to return customers to service. Entergy recorded corresponding regulatory assets of approximately $1.1 billion, including $1 billion at Entergy Louisiana and $80 million at Entergy New Orleans, and construction work in progress of approximately $1.6 billion, including $1.5 billion at Entergy Louisiana and $120 million at Entergy New Orleans. Entergy recorded the regulatory assets in accordance with its accounting policies and based on the historic treatment of such costs in its service area because management believes that recovery through some form of regulatory mechanism is probable. There are well-established mechanisms and precedent for addressing these catastrophic events and providing for recovery of prudently incurred storm costs in accordance with applicable regulatory and legal principles. Because Entergy has not gone through the regulatory process regarding these storm costs, there is an element of risk, and Entergy is unable to predict with certainty the degree of success it may have in its recovery initiatives, the amount of restoration costs that it may ultimately recover, or the timing of such recovery.

Entergy is considering all available avenues to recover storm-related costs from Hurricane Ida, including federal government assistance and securitization financing. In September 2021, Entergy Louisiana filed an application at the LPSC seeking approval of certain ratemaking adjustments in connection with the issuance of approximately $1 billion of shorter-term mortgage bonds to provide interim financing for restoration costs associated with Hurricane Ida, which bonds were issued in October 2021. Also in September 2021, as discussed below in “Storm Cost Filings with Retail Regulators - Entergy Louisiana - Hurricane Laura, Hurricane Delta, Hurricane Zeta, Winter Storm Uri, and Hurricane Ida,” Entergy Louisiana sought approval for the creation and funding of a $1 billion restricted escrow account for Hurricane Ida restoration costs, subject to a subsequent prudence review. In September 2021, Entergy New Orleans withdrew $39 million from its funded storm reserves. Storm cost recovery or financing will be subject to review by applicable regulatory authorities. In February 2022, Entergy New Orleans filed with the City Council a securitization application requesting that the City Council review Entergy New Orleans’s storm reserve and increase the storm reserve funding level to $150 million, to be funded through securitization.
Other Regulatory Liabilities

Entergy
 20212020
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$1,993.3 $1,694.1 
Louisiana Act 55 financing savings obligation (Note 3) (b)
127.4 144.3 
Retail rate over-recovery - refunded through formula rate or rate riders as rates are redetermined annually
126.5 75.1 
Vidalia purchased power agreement (Note 8) (b)
106.2 115.7 
Grand Gulf sale-leaseback - (Note 5 - Grand Gulf Sale-Leaseback Transactions)
55.6 55.6 
Asset retirement obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
45.5 29.7 
Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4 44.4 
Internal restructuring guaranteed tax credits19.8 26.4 
Deferred tax equity partnership earnings (Note 1)
18.1 — 
Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates December 2015 through November 2024
16.0 21.5 
Advanced metering system (AMS) surcharge - return to customers dependent upon AMS spend
7.3 20.1 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
— 43.5 
Other83.7 53.5 
Entergy Total$2,643.8 $2,323.9 

Entergy Arkansas
 20212020
 (In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$685.4 $597.4 
Internal restructuring guaranteed customer credits19.8 26.4 
Retail rate rider over-recovery - refunded through rate riders as rates are redetermined annually
18.9 19.6 
Deferred tax equity partnership earnings (Note 1)
18.1 — 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
— 43.5 
Other1.1 — 
Entergy Arkansas Total$743.3 $686.9 
Entergy Louisiana
 20212020
 (In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$692.2 $567.7 
Louisiana Act 55 financing savings obligation (Note 3)
127.4 144.3 
Vidalia purchased power agreement (Note 8) (b)
106.2 115.7 
Asset retirement obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
45.5 29.7 
Retail rate rider over-recovery - refunded through rate riders as rates are determined annually
30.7 36.0 
Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates December 2015 through November 2024
16.0 21.5 
Derivative Instruments & Hedging Activities (Note 15)
11.4 — 
Other13.2 3.4 
Entergy Louisiana Total$1,042.6 $918.3 

Entergy Mississippi
 20212020
 (In Millions)
Retail rate rider over-recovery - refunded through rate riders as rates are redetermined annually
$34.2 $14.2 
Grand Gulf over-recovery - returned to customers through rate riders as rates are redetermined annually
15.1 1.0 
Other— 0.6 
Entergy Mississippi Total$49.3 $15.8 

Entergy Texas
 20212020
 (In Millions)
Retail refunds - return to customers to be determined
$22.8 $— 
Advanced metering system (AMS) surcharge - returned to customers dependent upon AMS spend
7.3 20.1 
Income tax rate change - refunded through a rate rider (Note 2 - Retail Rate Proceedings)
2.7 6.5 
Transition to competition costs - returned to customers through rate riders when rates are redetermined periodically
— 3.2 
Other 4.3 2.5 
Entergy Texas Total$37.1 $32.3 
System Energy
 20212020
 (In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$615.7 $529.0 
Grand Gulf sale-leaseback - (Note 5 - Grand Gulf Sale-Leaseback Transactions)
55.6 55.6 
Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4 44.4 
Grand Gulf sale-leaseback accumulated deferred income taxes (a)
25.6 25.7 
Entergy Mississippis accumulated accelerated Grand Gulf amortization - amortized and credited through the Unit Power Sales Agreement
3.6 10.7 
System Energy Total$744.9 $665.4 

(a)Offset by related asset.
(b)As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21% effective January 2018, the Vidalia purchased power agreement regulatory liability was reduced by $30.5 million and the Louisiana Act 55 financing savings obligation regulatory liabilities were reduced by $25 million, with corresponding increases to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

Regulatory activity regarding the Tax Cuts and Jobs Act

See the “Other Tax Matters - Tax Cuts and Jobs Act” section in Note 3 to the financial statements for discussion of the effects of the December 2017 enactment of the Tax Cuts and Jobs Act (Tax Act), including its effects on Entergy’s and the Registrant Subsidiaries’ regulatory asset/liability for income taxes.

Entergy Arkansas

Consistent with its previously stated intent to return unprotected excess accumulated deferred income taxes to customers as expeditiously as possible, Entergy Arkansas initiated a tariff proceeding in February 2018 proposing to establish a tax adjustment rider to provide retail customers with certain tax benefits of $467 million associated with the Tax Act. For the residential customer class, unprotected excess accumulated deferred income taxes were returned to customers over a 21-month period from April 2018 through December 2019. For all other customer classes, unprotected excess accumulated deferred income taxes were returned to customers over a nine-month period from April 2018 through December 2018. A true-up provision also was included in the rider, with any over- or under-returned unprotected excess accumulated deferred income taxes credited or billed to customers during the billing month of January 2020, with any residual amounts of over- or under-returned unprotected excess accumulated deferred income taxes to be flowed through Entergy Arkansas’s energy cost recovery rider. In March 2018 the APSC approved the tax adjustment rider effective with the first billing cycle of April 2018.

As discussed below, in July 2018, Entergy Arkansas made its formula rate plan filing to set its formula rate for the 2019 calendar year. A hearing was held in May 2018 regarding the APSC’s inquiries into the effects of the Tax Act, including Entergy Arkansas’s proposal to utilize its formula rate plan rider for its customers to realize the remaining benefits of the Tax Act. Entergy Arkansas’s formula rate plan rider included a netting adjustment that compared actual annual results to the allowed rate of return on common equity. In July 2018 the APSC issued an order agreeing with Entergy Arkansas’s proposal to have the effects of the Tax Act on current income tax expense flow through Entergy Arkansas’s formula rate plan rider and with Entergy Arkansas’s treatment of protected and unprotected excess accumulated deferred income taxes. The APSC also directed Entergy Arkansas to submit in the tax adjustment rider proceeding, discussed above, the adjustments to all other riders affected by the Tax Act and to include an amendment for a true up mechanism where a rider affected by the Tax Act does not already contain a
true-up mechanism. Pursuant to a 2018 settlement agreement in Entergy Arkansas’s formula rate plan proceeding, Entergy Arkansas also removed the net operating loss accumulated deferred income tax asset caused by the Tax Act from Entergy Arkansas’s tax adjustment rider. Entergy Arkansas’s compliance tariff filings were accepted by the APSC in October 2018. In February 2021, pursuant to its 2020 formula rate plan evaluation report settlement, Entergy Arkansas flowed $5.6 million in credits to customers through the tax adjustment rider based on the outcome of certain federal tax positions and a decrease in the state tax rate.

Entergy Louisiana

In an electric formula rate plan settlement approved by the LPSC in April 2018 the parties agreed that Entergy Louisiana would return to customers one-half of its eligible unprotected excess deferred income taxes from May 2018 through December 2018 and return to customers the other half from January 2019 through August 2022. In addition, the settlement provided that in order to flow back to customers certain other tax benefits created by the Tax Act, Entergy Louisiana established a regulatory liability effective January 1, 2018 in the amount of $9.1 million per month to reflect these tax benefits already included in retail rates until new base rates under the formula rate plan were established in September 2018, and this regulatory liability was returned to customers over the September 2018 through August 2019 formula rate plan rate-effective period. The LPSC staff and intervenors in the settlement reserved the right to obtain data from Entergy Louisiana to confirm the determination of excess accumulated deferred income taxes resulting from the Tax Act and the analysis thereof as part of the formula rate plan review proceeding for the 2017 test year filing which, as discussed below, Entergy Louisiana filed in June 2018.

Entergy New Orleans

After enactment of the Tax Act the City Council passed a resolution ordering Entergy New Orleans to, effective January 1, 2018, record deferred regulatory liabilities to account for the Tax Act’s effect on Entergy New Orleans’s revenue requirement and to make a filing by mid-March 2018 regarding the Tax Act’s effects on Entergy New Orleans’s operating income and rate base and potential mechanisms for customers to receive benefits of the Tax Act. The City Council’s resolution also directed Entergy New Orleans to request that Entergy Services file with the FERC for revisions of the Unit Power Sales Agreement and MSS-4 replacement tariffs to address the return of excess accumulated deferred income taxes. Entergy submitted filings of this type to the FERC.

In March 2018, Entergy New Orleans filed its response to the resolution stating that the Tax Act reduced income tax expense from what was then reflected in rates by approximately $8.2 million annually for electric operations and by approximately $1.3 million annually for gas operations. In the filing, Entergy New Orleans proposed to return to customers from June 2018 through August 2019 the benefits of the reduction in income tax expense and its unprotected excess accumulated deferred income taxes through a combination of bill credits and investments in energy efficiency programs, grid modernization, and Smart City projects. Entergy New Orleans submitted supplemental information in April 2018 and May 2018. Shortly thereafter, Entergy New Orleans and the City Council’s advisors reached an agreement in principle that provides for benefits that will be realized by Entergy New Orleans customers through bill credits that started in July 2018 and offsets to future investments in energy efficiency programs, grid modernization, and Smart City projects, as well as additional benefits related to the filings made at the FERC. The agreement in principle was approved by the City Council in June 2018.

Entergy Texas

After enactment of the Tax Act the PUCT issued an order requiring most utilities, including Entergy Texas, beginning January 25, 2018, to record a regulatory liability for the difference between revenues collected under existing rates and revenues that would have been collected had existing rates been set using the new federal income tax rates and also for the balance of excess accumulated deferred income taxes. Entergy Texas had previously provided information to the PUCT staff and stated that it expected the PUCT to address the lower tax expense as part of Entergy Texas’s rate case expected to be filed in May 2018.
In May 2018, Entergy Texas filed its 2018 base rate case with the PUCT. Entergy Texas’s proposed rates and revenues reflected the inclusion of the federal income tax reductions due to the Tax Act. The PUCT issued an order in December 2018 establishing that 1) $25 million be credited to customers through a rider to reflect the lower federal income tax rate applicable to Entergy Texas from January 2018 through the date new rates were implemented, 2) $242.5 million of protected excess accumulated deferred income taxes be returned to customers through base rates under the average rate assumption method over the lives of the associated assets, and 3) $185.2 million of unprotected excess accumulated deferred income taxes be returned to customers through a rider. The unprotected excess accumulated deferred income taxes rider includes carrying charges and is in effect over a period of 12 months for larger customers and over a period of four years for other customers.

System Energy

In a filing made with the FERC in March 2018, System Energy proposed revisions to the Unit Power Sales Agreement to reflect the effects of the Tax Act. In the filing System Energy proposed to return identified quantities of unprotected excess accumulated deferred income taxes to its customers by the end of 2018. In May 2018 the FERC accepted System Energy’s proposed tax revisions with an effective date of June 1, 2018, subject to refund and the outcome of settlement and hearing procedures. Settlement discussions were terminated in April 2019, and a hearing was held in March 2020. The retail regulators of the Utility operating companies that are parties to the Unit Power Sales Agreement challenged the treatment and amount of excess accumulated deferred income tax liabilities associated with uncertain tax positions related to nuclear decommissioning. In July 2020 the presiding ALJ in the proceeding issued an initial decision finding that there is an additional $147 million in unprotected excess accumulated deferred income taxes related to System Energy’s uncertain decommissioning tax deduction. The initial decision determined that System Energy should have included the $147 million in its March 2018 filing. System Energy had not included credits related to the effect of the Tax Act on the uncertain decommissioning tax position because it was uncertain whether the IRS would allow the deduction. The initial decision rejected both System Energy’s alternative argument that any crediting should occur over a ten-year period and the retail regulators’ argument that any crediting should occur over a two-year period. Instead, the initial decision concluded that System Energy should credit the additional unprotected excess accumulated deferred income taxes in a single lump sum revenue requirement reduction following a FERC order addressing the initial decision.

The ALJ initial decision is an interim step in the FERC litigation process. In September 2020, System Energy filed a brief on exceptions with the FERC, re-urging its positions and requesting the reversal of the ALJ’s initial decision. In December 2020, the LPSC, APSC, MPSC, City Council, and FERC trial staff filed briefs opposing exceptions. The FERC will review the case and issue an order in the proceeding, and the FERC may accept, reject, or modify the ALJ’s initial decision in whole or in part. Credits, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.

As discussed below in Grand Gulf Sale-leaseback Renewal Complaint and Uncertain Tax Position Rate Base Issue,” in September 2020 the IRS issued a Notice of Proposed Adjustment (NOPA) and Entergy executed it. In September 2020, System Energy filed a motion to lodge the NOPA into the record in the FERC proceeding. In October 2020 the LPSC, APSC, MPSC, City Council, and FERC trial staff filed oppositions to System Energy’s motion. As a result of the NOPA, System Energy filed, in October 2020, a new Federal Power Act section 205 filing at the FERC to credit the excess accumulated deferred income taxes resulting from the decommissioning uncertain tax position. System Energy proposes to credit the entire amount of the excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position by issuing a one-time credit of $17.8 million. In November 2020, the LPSC, APSC, MPSC, and City Council filed a protest to the filing, and System Energy responded.

In November 2020 the IRS issued the Revenue Agent’s Report (RAR) for the 2014-2015 tax years and in December 2020 Entergy executed it. In December 2020, System Energy filed a motion to lodge the RAR into the record in the FERC proceeding addressing the Tax Cuts and Jobs Act. In January 2021 the LPSC, APSC, MPSC,
and City Council filed a joint answer opposing System Energy’s motion, and the FERC trial staff also filed an answer opposing System Energy’s motion.

As a result of the RAR, in December 2020, System Energy also filed an amendment to its Federal Power Act section 205 filing to credit excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position. The amendment proposed the inclusion of the RAR as support for the filing. In December 2020, the LPSC, APSC, and City Council filed a protest in response to the amendment, reiterating objections to the filing to credit excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position. In February 2021 the FERC issued an order accepting System Energy’s Federal Power Act section 205 filing subject to refund, setting it for hearing, and holding the hearing in abeyance.

In November 2020, System Energy filed a motion to vacate the ALJ’s decision, arguing that it had been overtaken by changed circumstances because of the IRS’s determination resulting from the NOPA and RAR. In January 2021 the LPSC, APSC, MPSC, and City Council filed a joint answer opposing System Energy’s motion, and the FERC trial staff also filed an answer opposing System Energy’s motion. Additional responsive pleadings were filed in February and March 2021. There is no formal deadline for FERC to rule on the motion.

Fuel and purchased power cost recovery

The Utility operating companies are allowed to recover fuel and purchased power costs through fuel mechanisms included in electric and gas rates that are recorded as fuel cost recovery revenues.  The difference between revenues collected and the current fuel and purchased power costs is generally recorded as “Deferred fuel costs” on the Utility operating companies’ financial statements.  The table below shows the amount of deferred fuel costs as of December 31, 2021 and 2020 that Entergy expects to recover (or return to customers) through fuel mechanisms, subject to subsequent regulatory review.

 20212020
 (In Millions)
Entergy Arkansas (a)$177.6 $15.2 
Entergy Louisiana (b)$213.5 $170.4 
Entergy Mississippi$121.9 ($14.7)
Entergy New Orleans (b)($3.5)$6.2 
Entergy Texas$48.3 ($85.4)

(a)Includes $68.8 million in 2021 and $68.2 million in 2020 of fuel and purchased power costs whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.
(b)Includes $168.1 million in both years for Entergy Louisiana and $4.1 million in both years for Entergy New Orleans of fuel, purchased power, and capacity costs, which do not currently earn a return on investment and whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.

Entergy Arkansas

Energy Cost Recovery Rider

Entergy Arkansas’s retail rates include an energy cost recovery rider to recover fuel and purchased energy costs in monthly customer bills.  The rider utilizes the prior calendar-year energy costs and projected energy sales for the twelve-month period commencing on April 1 of each year to develop an energy cost rate, which is redetermined annually and includes a true-up adjustment reflecting the over- or under-recovery, including carrying
charges, of the energy costs for the prior calendar year.  The energy cost recovery rider tariff also allows an interim rate request depending upon the level of over- or under-recovery of fuel and purchased energy costs.

In January 2014, Entergy Arkansas filed a motion with the APSC relating to its upcoming energy cost rate redetermination filing that was made in March 2014. In that motion, Entergy Arkansas requested that the APSC authorize Entergy Arkansas to exclude from the redetermination of its 2014 energy cost rate $65.9 million of incremental fuel and replacement energy costs incurred in 2013 as a result of the ANO stator incident. Entergy Arkansas requested that the APSC authorize Entergy Arkansas to retain that amount in its deferred fuel balance, with recovery to be reviewed in a later period after more information was available regarding various claims associated with the ANO stator incident. In February 2014 the APSC approved Entergy Arkansas’s request to retain that amount in its deferred fuel balance. In July 2017, Entergy Arkansas filed for a change in rates pursuant to its formula rate plan rider. In that proceeding, the APSC approved a settlement agreement agreed upon by the parties, including a provision that requires Entergy Arkansas to initiate a regulatory proceeding for the purpose of recovering funds currently withheld from rates and related to the stator incident, including the $65.9 million of deferred fuel and purchased energy costs previously noted, subject to certain timelines and conditions set forth in the settlement agreement. In October 2021 the APSC approved Entergy Arkansas’s second request to extend the deadline for initiating a regulatory proceeding for the purpose of recovering funds related to the stator incident for twelve additional months, or until December 1, 2022. See the “ANO Damage, Outage, and NRC Reviews” section in Note 8 to the financial statements for further discussion of the ANO stator incident.

In March 2017, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01164 per kWh to $0.01547 per kWh. The APSC staff filed testimony in March 2017 recommending that the redetermined rate be implemented with the first billing cycle of April 2017 under the normal operation of the tariff. Accordingly, the redetermined rate went into effect on March 31, 2017 pursuant to the tariff. In July 2017 the Arkansas Attorney General requested additional information to support certain of the costs included in Entergy Arkansas’s 2017 energy cost rate redetermination.

In March 2018, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01547 per kWh to $0.01882 per kWh. The Arkansas Attorney General filed a response to Entergy Arkansas’s annual redetermination filing requesting that the APSC suspend the proposed tariff to investigate the amount of the redetermination or, alternatively, to allow recovery subject to refund. Among the reasons the Attorney General cited for suspension were questions pertaining to how Entergy Arkansas forecasted sales and potential implications of the Tax Cuts and Jobs Act. Entergy Arkansas replied to the Attorney General’s filing and stated that, to the extent there are questions pertaining to its load forecasting or the operation of the energy cost recovery rider, those issues exceed the scope of the instant rate redetermination. Entergy Arkansas also stated that potential effects of the Tax Cuts and Jobs Act are appropriately considered in the APSC’s separate proceeding regarding potential implications of the tax law. The APSC general staff filed a reply to the Attorney General’s filing and agreed that Entergy Arkansas’s filing complied with the terms of the energy cost recovery rider. The redetermined rate became effective with the first billing cycle of April 2018. Subsequently in April 2018 the APSC issued an order declining to suspend Entergy Arkansas’s energy cost recovery rider rate and declining to require further investigation at that time of the issues suggested by the Attorney General in the proceeding. Following a period of discovery, the Attorney General filed a supplemental response in October 2018 raising new issues with Entergy Arkansas’s March 2018 rate redetermination and asserting that $45.7 million of the increase should be collected subject to refund pending further investigation. Entergy Arkansas filed to dismiss the Attorney General’s supplemental response, the APSC general staff filed a motion to strike the Attorney General’s filing, and the Attorney General filed a supplemental response disputing Entergy Arkansas and the APSC staff’s filing. Applicable APSC rules and processes authorize its general staff to initiate periodic audits of Entergy Arkansas’s energy cost recovery rider. In late-2018 the APSC general staff notified Entergy Arkansas it has initiated an audit of the 2017 fuel costs. The time in which the audit will be complete is uncertain at this time.
In March 2019, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected a decrease from $0.01882 per kWh to $0.01462 per kWh and became effective with the first billing cycle in April 2019. In March 2019 the Arkansas Attorney General filed a response to Entergy Arkansas’s annual adjustment and included with its filing a motion for investigation of alleged overcharges to customers in connection with the FERC’s October 2018 order in the opportunity sales proceeding. Entergy Arkansas filed its response to the Attorney General’s motion in April 2019 in which Entergy Arkansas stated its intent to initiate a proceeding to address recovery issues related to the October 2018 FERC order. In May 2019, Entergy Arkansas initiated the opportunity sales recovery proceeding, discussed below, and requested that the APSC establish that proceeding as the single designated proceeding in which interested parties may assert claims related to the appropriate retail rate treatment of the FERC October 2018 order and related FERC orders in the opportunity sales proceeding. In June 2019 the APSC granted Entergy Arkansas’s request and also denied the Attorney General’s motion in the energy cost recovery proceeding seeking an investigation into Entergy Arkansas’s annual energy cost recovery rider adjustment and referred the evaluation of such matters to the opportunity sales recovery proceeding.

In March 2020, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected a decrease from $0.01462 per kWh to $0.01052 per kWh. The redetermined rate became effective with the first billing cycle in April 2020 through the normal operation of the tariff.

In March 2021, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected a decrease from $0.01052 per kWh to $0.00959 per kWh. The redetermined rate calculation also included an adjustment to account for a portion of the increased fuel costs resulting from the February 2021 winter storms. The redetermined rate became effective with the first billing cycle in April 2021 through the normal operation of the tariff.

Entergy Louisiana

Entergy Louisiana recovers electric fuel and purchased power costs for the billing month based upon the level of such costs incurred two months prior to the billing month. Entergy Louisiana’s purchased gas adjustments include estimates for the billing month adjusted by a surcharge or credit that arises from an annual reconciliation of fuel costs incurred with fuel cost revenues billed to customers, including carrying charges.

In July 2014 the LPSC authorized its staff to initiate an audit of the fuel adjustment clause filings by Entergy Gulf States Louisiana, whose business was combined with Entergy Louisiana in 2015. The audit includes a review of the reasonableness of charges flowed through Entergy Gulf States Louisiana’s fuel adjustment clause for the period from 2010 through 2013. In January 2019 the LPSC staff consultant issued its audit report. In its report, the LPSC staff consultant recommended that Entergy Louisiana refund approximately $900,000, plus interest, to customers based upon the imputation of a claim of vendor fault in servicing its nuclear plant. Entergy Louisiana recorded a provision in the first quarter 2019 for the potential outcome of the audit. In August 2019, Entergy Louisiana filed direct testimony challenging the basis for the LPSC staff’s recommended disallowance and providing an alternative calculation of replacement power costs should it be determined that a disallowance is appropriate. Entergy Louisiana’s calculation would require no refund to customers.

In July 2014 the LPSC authorized its staff to initiate an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed by Entergy Louisiana through its fuel adjustment clause for the period from 2010 through 2013. In January 2019 the LPSC staff issued its audit report recommending that Entergy Louisiana refund approximately $7.3 million, plus interest, to customers based upon the imputation of a claim of vendor fault in servicing its nuclear plant. Entergy Louisiana recorded a provision in the first quarter 2019 for the potential outcome of the audit. In August 2019, Entergy Louisiana filed direct testimony challenging the basis for the LPSC staff’s recommended disallowance and providing an alternative calculation of replacement power costs should it be determined that a disallowance is appropriate. Entergy Louisiana’s calculation
would require a refund to customers of approximately $4.3 million, plus interest, as compared to the LPSC staff’s recommendation of $7.3 million, plus interest. Responsive testimony was filed by the LPSC staff and intervenors in September 2019; all parties either agreed with or did not oppose Entergy Louisiana’s alternative calculation of replacement power costs.

In November 2019 the pending LPSC proceedings for the 2010-2013 Entergy Louisiana and Entergy Gulf States Louisiana audits were consolidated to facilitate a settlement of both fuel audits. In December 2019 an unopposed settlement was reached that requires a refund to legacy Entergy Louisiana customers of approximately $2.3 million, including interest, and no refund to legacy Entergy Gulf States Louisiana customers. The LPSC approved the settlement in January 2020. A one-time refund was made in February 2020.

In March 2020 the LPSC staff provided notice of an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s fuel adjustment clause for the period from 2016 through 2019. In September 2021 the LPSC submitted its audit report and found that all costs recovered through the fuel adjustment clause were reasonable and eligible for recovery through the fuel adjustment clause. Intervenors are conducting discovery regarding the LPSC staff’s report.

In February 2021, Entergy Louisiana incurred extraordinary fuel costs associated with the February 2021 winter storms. To mitigate the effect of these costs on customer bills, in March 2021 Entergy Louisiana requested and the LPSC approved the deferral and recovery of $166 million in incremental fuel costs over five months beginning in April 2021. The incremental fuel costs remain subject to review for reasonableness and eligibility for recovery through the fuel adjustment clause mechanism. The final amount of incremental fuel costs is subject to change through the resettlement process. At its April 2021 meeting, the LPSC authorized its staff to review the prudence of the February 2021 fuel costs incurred by all LPSC-jurisdictional utilities. At its June 2021 meeting, the LPSC approved the hiring of consultants to assist its staff in this review. Discovery is ongoing.

In March 2021 the LPSC staff provided notice of an audit of Entergy Louisiana’s purchased gas adjustment clause filings covering the period January 2018 through December 2020. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s purchased gas adjustment clause for that period. Discovery is ongoing, and no audit report has been filed.

Entergy Mississippi

Entergy Mississippi’s rate schedules include an energy cost recovery rider that is adjusted annually to reflect accumulated over- or under-recoveries.  Entergy Mississippi’s fuel cost recoveries are subject to annual audits conducted pursuant to the authority of the MPSC.

In November 2018, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an under-recovery of approximately $57 million as of September 30, 2018. In January 2019 the MPSC approved the proposed energy cost factor effective for February 2019 bills.

In November 2019, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation included $39.6 million of prior over-recovery flowing back to customers beginning February 2020. Entergy Mississippi’s balance in its deferred fuel account did not decrease as expected after implementation of the new factor. In an effort to assist customers during the COVID-19 pandemic, in May 2020, Entergy Mississippi requested an interim adjustment to the energy cost recovery rider to credit approximately $50 million from the over-recovered balance in the deferred fuel account to customers over four consecutive billing months. The MPSC approved this interim adjustment in May 2020 effective for June through September 2020 bills.
In November 2020, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an over-recovery of approximately $24.4 million as of September 30, 2020. In January 2021 the MPSC approved the proposed energy cost factor effective for February 2021 bills.

In November 2021, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an under-recovery of approximately $80.6 million as of September 30, 2021. In December 2021, at the request of the MPSC, Entergy Mississippi submitted a proposal to mitigate the impact of rising fuel costs on customer bills during 2022. Entergy Mississippi proposed that the deferred fuel balance as of December 31, 2021, which was $121.9 million, be amortized over three years, and that the MPSC authorize Entergy Mississippi to apply its weighted-average cost of capital as the carrying cost for the unamortized fuel balance. In January 2022 the MPSC approved the amortization of $100 million of the deferred fuel balance over two years and authorized Entergy Mississippi to apply its weighted-average cost of capital as the carrying cost for the unamortized fuel balance. The MPSC approved the proposed energy cost factor effective for February 2022 bills.

Entergy New Orleans

Entergy New Orleans’s electric rate schedules include a fuel adjustment tariff designed to reflect no more than targeted fuel and purchased power costs, adjusted by a surcharge or credit for deferred fuel expense arising from the monthly reconciliation of actual fuel and purchased power costs incurred with fuel cost revenues billed to customers, including carrying charges.

Entergy New Orleans’s gas rate schedules include a purchased gas adjustment to reflect estimated gas costs for the billing month, adjusted by a surcharge or credit similar to that included in the electric fuel adjustment clause, including carrying charges.

Entergy Texas

Entergy Texas’s rate schedules include a fixed fuel factor to recover fuel and purchased power costs, including interest, not recovered in base rates.  Semi-annual revisions of the fixed fuel factor are made in March and September based on the market price of natural gas and changes in fuel mix.  The amounts collected under Entergy Texas’s fixed fuel factor and any interim surcharge or refund are subject to fuel reconciliation proceedings before the PUCT. A fuel reconciliation is required to be filed at least once every three years and outside of a base rate case filing.

In September 2019, Entergy Texas filed an application to reconcile its fuel and purchased power costs for the period from April 2016 through March 2019. During the reconciliation period, Entergy Texas incurred approximately $1.6 billion in Texas jurisdictional eligible fuel and purchased power expenses, net of certain revenues credited to such expenses and other adjustments. Entergy Texas estimated an under-recovery balance of approximately $25.8 million, including interest, which Entergy Texas requested authority to carry over as the beginning balance for the subsequent reconciliation period beginning April 2019. In March 2020 an intervenor filed testimony proposing that the PUCT disallow: (1) $2 million in replacement power costs associated with generation outages during the reconciliation period; and (2) $24.4 million associated with the operation of the Spindletop natural gas storage facility during the reconciliation period.  In April 2020, Entergy Texas filed rebuttal testimony refuting all points raised by the intervenor.  In June 2020 the parties filed a stipulation and settlement agreement, which included a $1.2 million disallowance not associated with any particular issue raised by any party. The PUCT approved the settlement in August 2020.

In July 2020, Entergy Texas filed an application with the PUCT to implement an interim fuel refund of $25.5 million, including interest. Entergy Texas proposed that the interim fuel refund be implemented beginning with the first August 2020 billing cycle over a three-month period for smaller customers and in a lump sum amount
in the billing month of August 2020 for transmission-level customers. The interim fuel refund was approved in July 2020, and Entergy Texas began refunds in August 2020.

In February 2021, Entergy Texas filed an application to implement a fuel refund for a cumulative over-recovery of approximately $75 million that is primarily attributable to settlements received by Entergy Texas from MISO related to Hurricane Laura. Entergy Texas planned to issue the refund over the period of March through August 2021. On February 22, 2021, Entergy Texas filed a motion to abate its fuel refund proceeding to assess how the February 2021 winter storm impacted Entergy Texas’s fuel over-recovery position. In March 2021, Entergy Texas withdrew its application to implement the fuel refund. Entergy Texas is continuing to evaluate its fuel balance and will file a subsequent refund or surcharge application consistent with the requirements of the PUCT’s rules.
Entergy Arkansas Opportunity Sales Proceeding

In June 2009 the LPSC filed a complaint requesting that the FERC determine that certain of Entergy Arkansas’s sales of electric energy to third parties: (a) violated the provisions of the System Agreement that allocated the energy generated by Entergy System resources; (b) imprudently denied the Entergy System and its ultimate consumers the benefits of low-cost Entergy System generating capacity; and (c) violated the provision of the System Agreement that prohibited sales to third parties by individual companies absent an offer of a right-of-first-refusal to other Utility operating companies.  The LPSC’s complaint challenged sales made beginning in 2002 and requested refunds.  In July 2009 the Utility operating companies filed a response to the complaint arguing among other things that the System Agreement contemplates that the Utility operating companies may make sales to third parties for their own account, subject to the requirement that those sales be included in the load (or load shape) for the applicable Utility operating company.  The FERC subsequently ordered a hearing in the proceeding.

After a hearing, the ALJ issued an initial decision in December 2010.  The ALJ found that the System Agreement allowed for Entergy Arkansas to make the sales to third parties but concluded that the sales should be accounted for in the same manner as joint account sales.  The ALJ concluded that “shareholders” should make refunds of the damages to the Utility operating companies, along with interest.  Entergy disagreed with several aspects of the ALJ’s initial decision and in January 2011 filed with the FERC exceptions to the decision.
The FERC issued a decision in June 2012 and held that, while the System Agreement is ambiguous, it does provide authority for individual Utility operating companies to make opportunity sales for their own account and Entergy Arkansas made and priced these sales in good faith.  The FERC found, however, that the System Agreement does not provide authority for an individual Utility operating company to allocate the energy associated with such opportunity sales as part of its load but provides a different allocation authority.  The FERC further found that the after-the-fact accounting methodology used to allocate the energy used to supply the sales was inconsistent with the System Agreement.  The FERC in its decision established further hearing procedures to quantify the effect of repricing the opportunity sales in accordance with the FERC’s June 2012 decision. The hearing was held in May 2013 and the ALJ issued an initial decision in August 2013. The LPSC, the APSC, the City Council, and FERC staff filed briefs on exceptions and/or briefs opposing exceptions. Entergy filed a brief on exceptions requesting that the FERC reverse the initial decision and a brief opposing certain exceptions taken by the LPSC and FERC staff.

In April 2016 the FERC issued orders addressing requests for rehearing filed in July 2012 and the ALJ’s August 2013 initial decision. The first order denied Entergy’s request for rehearing and affirmed the FERC’s earlier rulings that Entergy’s original methodology for allocating energy costs to the opportunity sales was incorrect and, as a result, Entergy Arkansas must make payments to the other Utility operating companies to put them in the same position that they would have been in absent the incorrect allocation. The FERC clarified that interest should be included with the payments. The second order affirmed in part, and reversed in part, the rulings in the ALJ’s August 2013 initial decision regarding the methodology that should be used to calculate the payments Entergy Arkansas is to make to the other Utility operating companies. The FERC affirmed the ALJ’s ruling that a full re-run of intra-system bills should be performed but required that methodology be modified so that the sales have the same priority for purposes of energy allocation as joint account sales. The FERC reversed the ALJ’s decision that any payments by Entergy Arkansas should be reduced by 20%. The FERC also reversed the ALJ’s decision that adjustments to other System Agreement service schedules and excess bandwidth payments should not be taken into account when calculating the payments to be made by Entergy Arkansas. The FERC held that such adjustments and excess bandwidth payments should be taken into account but ordered further proceedings before an ALJ to address whether a cap on any reduction due to bandwidth payments was necessary and to implement the other adjustments to the calculation methodology.

In May 2016, Entergy Services filed a request for rehearing of the FERC’s April 2016 order arguing that payments made by Entergy Arkansas should be reduced as a result of the timing of the LPSC’s approval of certain contracts. Entergy Services also filed a request for clarification and/or rehearing of the FERC’s April 2016 order addressing the ALJ’s August 2013 initial decision. The APSC and the LPSC also filed requests for rehearing of the FERC’s April 2016 order. In September 2017 the FERC issued an order denying the request for rehearing on the issue of whether any payments by Entergy Arkansas to the other Utility operating companies should be reduced due to the timing of the LPSC’s approval of Entergy Arkansas’s wholesale baseload contract with Entergy Louisiana. In November 2017 the FERC issued an order denying all of the remaining requests for rehearing of the April 2016 order. In November 2017, Entergy Services filed a petition for review in the D.C. Circuit of the FERC’s orders in the first two phases of the opportunity sales case. In December 2017 the D.C. Circuit granted Entergy Services’ request to hold the appeal in abeyance pending final resolution of the related proceeding before the FERC. In January 2018 the APSC and the LPSC filed separate petitions for review in the D.C. Circuit, and the D.C. Circuit consolidated the appeals with Entergy Services’ appeal.

The hearing required by the FERC’s April 2016 order was held in May 2017. In July 2017 the ALJ issued an initial decision addressing whether a cap on any reduction due to bandwidth payments was necessary and whether to implement the other adjustments to the calculation methodology. In August 2017 the Utility operating companies, the LPSC, the APSC, and FERC staff filed individual briefs on exceptions challenging various aspects of the initial decision. In September 2017 the Utility operating companies, the LPSC, the APSC, the MPSC, the City Council, and FERC staff filed separate briefs opposing exceptions taken by various parties.
Based on testimony previously submitted in the case and its assessment of the April 2016 FERC orders, in the first quarter 2016, Entergy Arkansas recorded a liability of $87 million, which included interest, for its estimated increased costs and payment to the other Utility operating companies, and a deferred fuel regulatory asset of $75 million. Following its assessment of the course of the proceedings, including the FERC’s denial of rehearing in November 2017 described above, in the fourth quarter 2017, Entergy Arkansas recorded an additional liability of $35 million and a regulatory asset of $31 million.

In October 2018 the FERC issued an order addressing the ALJ’s July 2017 initial decision. The FERC reversed the ALJ’s decision to cap the reduction in Entergy Arkansas’s payment to account for the increased bandwidth payments that Entergy Arkansas made to the other operating companies. The FERC also reversed the ALJ’s decision that Grand Gulf sales from January through September 2000 should be included in the calculation of Entergy Arkansas’s payment. The FERC affirmed on other grounds the ALJ’s rejection of the LPSC’s claim that certain joint account sales should be accounted for as part of the calculation of Entergy Arkansas’s payment. In November 2018 the LPSC requested rehearing of the FERC’s October 2018 decision. In December 2019 the FERC denied the LPSC’s request for rehearing. In January 2020 the LPSC appealed the December 2019 decision to the D.C. Circuit.

In December 2018, Entergy made a compliance filing in response to the FERC’s October 2018 order. The compliance filing provided a final calculation of Entergy Arkansas’s payments to the other Utility operating companies, including interest. No protests were filed in response to the December 2018 compliance filing. The December 2018 compliance filing is pending FERC action. Refunds and interest in the following amounts were paid by Entergy Arkansas to the other operating companies in December 2018:

 Total refunds including interest
Payment/(Receipt)
 (In Millions)
PrincipalInterestTotal
Entergy Arkansas$68$67$135
Entergy Louisiana($30)($29)($59)
Entergy Mississippi($18)($18)($36)
Entergy New Orleans($3)($4)($7)
Entergy Texas($17)($16)($33)

Entergy Arkansas previously recognized a regulatory asset with a balance of $116 million as of December 31, 2018 for a portion of the payments due as a result of this proceeding.

As described above, the FERC’s opportunity sales orders have been appealed to the D.C. Circuit. In February 2020 all of the appeals were consolidated and in April 2020 the D.C. Circuit established a briefing schedule. Briefing was completed in September 2020 and oral argument was heard in December 2020. In July 2021 the D.C. Circuit issued a decision denying all of the petitions for review filed in response to the FERC’s opportunity sales orders.

In February 2019 the LPSC filed a new complaint relating to two issues that were raised in the opportunity sales proceeding, but that, in its October 2018 order, the FERC held were outside the scope of the proceeding. In March 2019, Entergy Services filed an answer and motion to dismiss the new complaint. In November 2019 the FERC issued an order denying the LPSC’s complaint. The order concluded that the settlement agreement approved by the FERC in December 2015 terminating the System Agreement barred the LPSC’s new complaint. In December 2019 the LPSC requested rehearing of the FERC’s November 2019 order, and in July 2020 the FERC issued an order dismissing the LPSC’s request for rehearing. In September 2020 the LPSC appealed to the D.C. Circuit the FERC’s orders dismissing the new opportunity sales complaint. In November 2020 the D.C. Circuit
issued an order establishing that briefing will occur in January 2021 through April 2021. Oral argument was held in September 2021. In December 2021 the D.C. Circuit denied the LPSC’s Petition for Review of the new opportunity sales complaint. The opportunity sales cases are complete at FERC and at the D.C. Circuit and no additional refund amounts are owed by Entergy Arkansas.

In May 2019, Entergy Arkansas filed an application and supporting testimony with the APSC requesting approval of a special rider tariff to recover the costs of these payments from its retail customers over a 24-month period.  The application requested that the APSC approve the rider to take effect within 30 days or, if suspended by the APSC as allowed by commission rule, approve the rider to take effect in the first billing cycle of the first month occurring 30 days after issuance of the APSC’s order approving the rider. In June 2019 the APSC suspended Entergy Arkansas’s tariff and granted Entergy Arkansas’s motion asking the APSC to establish the proceeding as the single designated proceeding in which interested parties may assert claims related to the appropriate retail rate treatment of the FERC’s October 2018 order and related FERC orders in the opportunity sales proceeding. In January 2020 the APSC adopted a procedural schedule with a hearing in April 2020. In January 2020 the Attorney General and Arkansas Electric Energy Consumers, Inc. filed a joint motion seeking to dismiss Entergy Arkansas’s application alleging that the APSC, in a prior proceeding, ruled on the issues addressed in the application and determined that Entergy Arkansas’s requested relief violates the filed rate doctrine and the prohibition against retroactive ratemaking. Entergy Arkansas responded to the joint motion in February 2020 rebutting these arguments, including demonstrating that the claims in this proceeding differ substantially from those the APSC addressed previously and that the payment resulting from a FERC tariff violation for which Entergy Arkansas seeks retail cost recovery in this proceeding differs materially from the refunds resulting from a FERC tariff amendment that the APSC previously rejected on filed rate doctrine and the retroactive ratemaking grounds. In addition, in January 2020 the Attorney General and Arkansas Electric Energy Consumers, Inc. filed testimony opposing the recovery by Entergy Arkansas of the opportunity sales payment but also claiming that certain components of the payment should be segregated and refunded to customers. In March 2020, Entergy Arkansas filed rebuttal testimony.

In July 2020 the APSC issued a decision finding that Entergy Arkansas’s application is not in the public interest. The order also directed Entergy Arkansas to refund to its retail customers within 30 days of the order the FERC-determined over-collection of $13.7 million, plus interest, associated with a recalculated bandwidth remedy. In addition to these primary findings, the order also denied the Attorney General’s request for Entergy Arkansas to prepare a compliance filing detailing all of the retail impacts from the opportunity sales and denied a request by the Arkansas Electric Energy Consumers to recalculate all costs using the revised responsibility ratio. Entergy Arkansas filed a motion for temporary stay of the 30-day requirement to allow Entergy Arkansas a reasonable opportunity to seek rehearing of the APSC order, but in July 2020 the APSC denied Entergy Arkansas’s request for a stay and directed Entergy Arkansas to refund to its retail customers the component of the total FERC-determined opportunity sales payment that was associated with increased bandwidth remedy payments of $13.7 million, plus interest. The refunds were issued in the August 2020 billing cycle. While the APSC denied Entergy Arkansas’s stay request, Entergy Arkansas believes its actions were prudent and, therefore, the costs, including the $13.7 million, plus interest, are recoverable. In July 2020, Entergy Arkansas requested rehearing of the APSC order, which rehearing was denied by the APSC in August 2020. In September 2020, Entergy Arkansas filed a complaint in the U.S. District Court for the Eastern District of Arkansas challenging the APSC’s order denying Entergy Arkansas’s request to recover the costs of these payments. In October 2020 the APSC filed a motion to dismiss Entergy Arkansas’s complaint, to which Entergy Arkansas responded. Also in December 2020, Entergy Arkansas and the APSC held a pre-trial conference, and filed a report with the court in January 2021. The court held a hearing in February 2021 regarding issues addressed in the pre-trial conference report, and in June 2021 the court stayed all discovery until it rules on pending motions, after which the court will issue an amended schedule if necessary.
Complaints Against System Energy

System Energy’s operating revenues are derived from the allocation of the capacity, energy, and related costs associated with its 90% ownership/leasehold interest in Grand Gulf.  System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans pursuant to the Unit Power Sales Agreement. System Energy and the Unit Power Sales Agreement are currently the subject of several litigation proceedings at the FERC, including challenges with respect to System Energy’s authorized return on equity and capital structure, renewal of its sale-leaseback arrangement, treatment of uncertain tax positions, a broader investigation of rates under the Unit Power Sales Agreement, and a prudence complaint challenging the extended power uprate completed at Grand Gulf in 2012 and the operation and management of Grand Gulf, particularly in the 2016-2020 time period. The claims in these proceedings include claims for refunds and claims for rate adjustments; the aggregate amount of refunds claimed in these proceedings substantially exceeds the net book value of System Energy. Following are discussions of the proceedings.

Return on Equity and Capital Structure Complaints

In January 2017 the APSC and MPSC filed a complaint with the FERC against System Energy. The complaint seeks a reduction in the return on equity component of the Unit Power Sales Agreement pursuant to which System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. Entergy Arkansas also sells some of its Grand Gulf capacity and energy to Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under separate agreements. The current return on equity under the Unit Power Sales Agreement is 10.94%, which was established in a rate proceeding that became final in July 2001.

The APSC and MPSC complaint alleges that the return on equity is unjust and unreasonable because capital market and other considerations indicate that it is excessive. The complaint requests proceedings to investigate the return on equity and establish a lower return on equity, and also requests that the FERC establish January 23, 2017 as a refund effective date. The complaint includes return on equity analysis that purports to establish that the range of reasonable return on equity for System Energy is between 8.37% and 8.67%. System Energy answered the complaint in February 2017 and disputes that a return on equity of 8.37% to 8.67% is just and reasonable. The LPSC and the City Council intervened in the proceeding expressing support for the complaint. In September 2017 the FERC established a refund effective date of January 23, 2017 and directed the parties to engage in settlement proceedings before an ALJ. The parties were unable to settle the return on equity issue and a FERC hearing judge was assigned in July 2018. The 15-month refund period in connection with the APSC/MPSC complaint expired on April 23, 2018.

In April 2018 the LPSC filed a complaint with the FERC against System Energy seeking an additional 15-month refund period.  The LPSC complaint requests similar relief from the FERC with respect to System Energy’s return on equity and also requests the FERC to investigate System Energy’s capital structure.  The APSC, MPSC, and City Council intervened in the proceeding, filed an answer expressing support for the complaint, and asked the FERC to consolidate this proceeding with the proceeding initiated by the complaint of the APSC and MPSC in January 2017. System Energy answered the LPSC complaint in May 2018 and also filed a motion to dismiss the complaint. In August 2018 the FERC issued an order dismissing the LPSC’s request to investigate System Energy’s capital structure and setting for hearing the return on equity complaint, with a refund effective date of April 27, 2018. The 15-month refund period in connection with the LPSC return on equity complaint expired on July 26, 2019.

The portion of the LPSC’s complaint dealing with return on equity was subsequently consolidated with the APSC and MPSC complaint for hearing. The parties addressed an order (issued in a separate FERC proceeding involving New England transmission owners) that proposed modifying the FERC’s standard methodology for determining return on equity. In September 2018, System Energy filed a request for rehearing and the LPSC filed a request for rehearing or reconsideration of the FERC’s August 2018 order. The LPSC’s request referenced an
amended complaint that it filed on the same day raising the same capital structure claim the FERC had earlier dismissed. The FERC initiated a new proceeding for the amended capital structure complaint, and System Energy submitted a response in October 2018. In January 2019 the FERC set the amended complaint for settlement and hearing proceedings. Settlement proceedings in the capital structure proceeding commenced in February 2019. As noted below, in June 2019 settlement discussions were terminated and the amended capital structure complaint was consolidated with the ongoing return on equity proceeding. The 15-month refund period in connection with the capital structure complaint was from September 24, 2018 to December 23, 2019.

In January 2019 the LPSC and the APSC and MPSC filed direct testimony in the return on equity proceeding. For the refund period January 23, 2017 through April 23, 2018, the LPSC argues for an authorized return on equity for System Energy of 7.81% and the APSC and MPSC argue for an authorized return on equity for System Energy of 8.24%. For the refund period April 27, 2018 through July 27, 2019, and for application on a prospective basis, the LPSC argues for an authorized return on equity for System Energy of 7.97% and the APSC and MPSC argue for an authorized return on equity for System Energy of 8.41%. In March 2019, System Energy submitted answering testimony. For the first refund period, System Energy’s testimony argues for a return on equity of 10.10% (median) or 10.70% (midpoint). For the second refund period, System Energy’s testimony shows that the calculated returns on equity for the first period fall within the range of presumptively just and reasonable returns on equity, and thus the second complaint should be dismissed (and the first period return on equity used going forward). If the FERC nonetheless were to set a new return on equity for the second period (and going forward), System Energy argues the return on equity should be either 10.32% (median) or 10.69% (midpoint).

In May 2019 the FERC trial staff filed its direct and answering testimony in the return on equity proceeding. For the first refund period, the FERC trial staff calculates an authorized return on equity for System Energy of 9.89% based on the application of FERC’s proposed methodology. The FERC trial staff’s direct and answering testimony noted that an authorized return on equity of 9.89% for the first refund period was within the range of presumptively just and reasonable returns on equity for the second refund period, as calculated using a study period ending January 31, 2019 for the second refund period.

In June 2019, System Energy filed testimony responding to the testimony filed by the FERC trial staff. Among other things, System Energy’s testimony rebutted arguments raised by the FERC trial staff and provided updated calculations for the second refund period based on the study period ending May 31, 2019. For that refund period, System Energy’s testimony shows that strict application of the return on equity methodology proposed by the FERC staff indicates that the second complaint would not be dismissed, and the new return on equity would be set at 9.65% (median) or 9.74% (midpoint). System Energy’s testimony argues that these results are insufficient in light of benchmarks such as state returns on equity and treasury bond yields, and instead proposes that the calculated returns on equity for the second period should be either 9.91% (median) or 10.3% (midpoint). System Energy’s testimony also argues that, under application of its proposed modified methodology, the 10.10% return on equity calculated for the first refund period would fall within the range of presumptively just and reasonable returns on equity for the second refund period.

Also in June 2019, the FERC’s Chief ALJ issued an order terminating settlement discussions in the amended complaint addressing System Energy’s capital structure. The ALJ consolidated the amended capital structure complaint with the ongoing return on equity proceeding and set new procedural deadlines for the consolidated hearing.

In August 2019 the LPSC and the APSC and MPSC filed rebuttal testimony in the return on equity proceeding and direct and answering testimony relating to System Energy’s capital structure. The LPSC re-argues for an authorized return on equity for System Energy of 7.81% for the first refund period and 7.97% for the second refund period. The APSC and MPSC argue for an authorized return on equity for System Energy of 8.26% for the first refund period and 8.32% for the second refund period. With respect to capital structure, the LPSC proposes that the FERC establish a hypothetical capital structure for System Energy for ratemaking purposes. Specifically, the LPSC proposes that System Energy’s common equity ratio be set to Entergy Corporation’s equity ratio of 37%
equity and 63% debt. In the alternative, the LPSC argues that the equity ratio should be no higher than 49%, the composite equity ratio of System Energy and the other Entergy operating companies who purchase under the Unit Power Sales Agreement. The APSC and MPSC recommend that 35.98% be set as the common equity ratio for System Energy. As an alternative, the APSC and MPSC propose that System Energy’s common equity be set at 46.75% based on the median equity ratio of the proxy group for setting the return on equity.

In September 2019 the FERC trial staff filed its rebuttal testimony in the return on equity proceeding. For the first refund period, the FERC trial staff calculates an authorized return on equity for System Energy of 9.40% based on the application of the FERC’s proposed methodology and an updated proxy group. For the second refund period, based on the study period ending May 31, 2019, the FERC trial staff rebuttal testimony argues for a return on equity of 9.63%. In September 2019 the FERC trial staff also filed direct and answering testimony relating to System Energy’s capital structure. The FERC trial staff argues that the average capital structure of the proxy group used to develop System Energy’s return on equity should be used to establish the capital structure. Using this approach, the FERC trial staff calculates the average capital structure for its proposed proxy group of 46.74% common equity, and 53.26% debt.

In October 2019, System Energy filed answering testimony disputing the FERC trial staff’s, the LPSC’s, and the APSC’s and MPSC’s arguments for the use of a hypothetical capital structure and arguing that the use of System Energy’s actual capital structure is just and reasonable.

In November 2019, in a proceeding that did not involve System Energy, the FERC issued an order addressing the methodology for determining the return on equity applicable to transmission owners in MISO. Thereafter, the procedural schedule in the System Energy proceeding was amended to allow the participants to file supplemental testimony addressing the order in the MISO transmission owner proceeding (Opinion No. 569).

In February 2020 the LPSC, the MPSC and APSC, and the FERC trial staff filed supplemental testimony addressing Opinion No. 569 and how it would affect the return on equity evaluation for the two complaint periods concerning System Energy. For the first refund period, based on their respective interpretations and applications of the Opinion No. 569 methodology, the LPSC argues for an authorized return on equity for System Energy of 8.44%; the MPSC and APSC argue for an authorized return on equity of 8.41%; and the FERC trial staff argues for an authorized return on equity of 9.22%. For the second refund period and on a prospective basis, based on their respective interpretations and applications of the Opinion No. 569 methodology, the LPSC argues for an authorized return on equity for System Energy of 7.89%; the MPSC and APSC argue that an authorized return on equity of 8.01% may be appropriate; and the FERC trial staff argues for an authorized return on equity of 8.66%.

In April 2020, System Energy filed supplemental answering testimony addressing Opinion No. 569. System Energy argues that the Opinion No. 569 methodology is conceptually and analytically defective for purposes of establishing just and reasonable authorized return on equity determinations and proposes an alternative approach. As its primary recommendation, System Energy continues to support the return on equity determinations in its March 2019 testimony for the first refund period and its June 2019 testimony for the second refund period. Under the Opinion No. 569 methodology, System Energy calculates a “presumptively just and reasonable range” for the authorized return on equity for the first refund period of 8.57% to 9.52%, and for the second refund period of 8.28% to 9.11%. System Energy argues that these ranges are not just and reasonable results. Under its proposed alternative methodology, System Energy calculates an authorized return on equity of 10.26% for the first refund period, which also falls within the presumptively just and reasonable range calculated for the second refund period and prospectively.

In May 2020 the FERC issued an order on rehearing of Opinion No. 569 (Opinion No. 569-A). In June 2020 the procedural schedule in the System Energy proceeding was further revised in order to allow parties to address the Opinion No. 569-A methodology. Pursuant to the revised schedule, in June 2020, the LPSC, MPSC and APSC, and the FERC trial staff filed supplemental testimony addressing Opinion No. 569-A and how it would affect the return on equity evaluation for the two complaint periods concerning System Energy. For the first refund
period, based on their respective interpretations and applications of the Opinion No. 569-A methodology, the LPSC argues for an authorized return on equity for System Energy of 7.97%; the MPSC and APSC argue for an authorized return on equity of 9.24%; and the FERC trial staff argues for an authorized return on equity of 9.49%. For the second refund period and on a prospective basis, based on their respective interpretations and applications of the Opinion No. 569-A methodology, the LPSC argues for an authorized return on equity for System Energy of 7.78%; the MPSC and APSC argue that an authorized return on equity of 9.15% may be appropriate if the second complaint is not dismissed; and the FERC trial staff argues for an authorized return on equity of 9.09% if the second complaint is not dismissed.

Pursuant to the revised procedural schedule, in July 2020, System Energy filed supplemental testimony addressing Opinion No. 569-A. System Energy argues that strict application of the Opinion No. 569-A methodology produces results inconsistent with investor requirements and does not provide a sound basis on which to evaluate System Energy’s authorized return on equity. As its primary recommendation, System Energy argues for the use of a methodology that incorporates four separate financial models, including the constant growth form of the discounted cash flow model and the empirical capital asset pricing model. Based on application of its recommended methodology, System Energy argues for an authorized return on equity of 10.12% for the first refund period, which also falls within the presumptively just and reasonable range calculated for the second refund period and prospectively. Under the Opinion No. 569-A methodology, System Energy calculates an authorized return on equity of 9.44% for the first refund period, which also falls within the presumptively just and reasonable range calculated for the second refund period and prospectively.

The parties and FERC trial staff filed final rounds of testimony in August 2020. The hearing before a FERC ALJ occurred in late-September through early-October 2020, post-hearing briefing took place in November and December 2020.

In March 2021 the FERC ALJ issued an initial decision. With regard to System Energy’s authorized return on equity, the ALJ determined that the existing return on equity of 10.94% is no longer just and reasonable, and that the replacement authorized return on equity, based on application of the Opinion No. 569-A methodology, should be 9.32%. The ALJ further determined that System Energy should pay refunds for a fifteen-month refund period (January 2017-April 2018) based on the difference between the current return on equity and the replacement authorized return on equity. The ALJ determined that the April 2018 complaint concerning the authorized return on equity should be dismissed, and that no refunds for a second fifteen-month refund period should be due. With regard to System Energy’s capital structure, the ALJ determined that System Energy’s actual equity ratio is excessive and that the just and reasonable equity ratio is 48.15% equity, based on the average equity ratio of the proxy group used to evaluate the return on equity for the second complaint. The ALJ further determined that System Energy should pay refunds for a fifteen-month refund period (September 2018-December 2019) based on the difference between the actual equity ratio and the 48.15% equity ratio. If the ALJ’s initial decision is upheld, the estimated refund for this proceeding is approximately $60 million, which includes interest through December 31, 2021, and the estimated resulting annual rate reduction would be approximately $45 million. The estimated refund will continue to accrue interest until a final FERC decision is issued. Based on the course of the proceeding to date, System Energy has recorded a provision of $37 million, including interest, as of December 31, 2021.

The ALJ initial decision is an interim step in the FERC litigation process, and an ALJ’s determinations made in an initial decision are not controlling on the FERC. In April 2021, System Energy filed its brief on exceptions, in which it challenged the initial decision’s findings on both the return on equity and capital structure issues. Also in April 2021 the LPSC, APSC, MPSC, City Council, and the FERC trial staff filed briefs on exceptions. Reply briefs opposing exceptions were filed in May 2021 by System Energy, the FERC trial staff, the LPSC, APSC, MPSC, and the City Council. Refunds, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.
Grand Gulf Sale-leaseback Renewal Complaint and Uncertain Tax Position Rate Base Issue

In May 2018 the LPSC filed a complaint against System Energy and Entergy Services related to System Energy’s renewal of a sale-leaseback transaction originally entered into in December 1988 for an 11.5% undivided interest in Grand Gulf Unit 1. The complaint alleges that System Energy violated the filed rate and the FERC’s ratemaking and accounting requirements when it included in Unit Power Sales Agreement billings the cost of capital additions associated with the sale-leaseback interest, and that System Energy is double-recovering costs by including both the lease payments and the capital additions in Unit Power Sales Agreement billings. The complaint also claims that System Energy was imprudent in entering into the sale-leaseback renewal because the Utility operating companies that purchase Grand Gulf’s output from System Energy could have obtained cheaper capacity and energy in the MISO markets. The complaint further alleges that System Energy violated various other reporting and accounting requirements and should have sought prior FERC approval of the lease renewal. The complaint seeks various forms of relief from the FERC. The complaint seeks refunds for capital addition costs for all years in which they were recorded in allegedly non-formula accounts or, alternatively, the disallowance of the return on equity for the capital additions in those years plus interest. The complaint also asks that the FERC disallow and refund the lease costs of the sale-leaseback renewal on grounds of imprudence, investigate System Energy’s treatment of a DOE litigation payment, and impose certain forward-looking procedural protections, including audit rights for retail regulators of the Unit Power Sales Agreement formula rates. The APSC, MPSC, and City Council intervened in the proceeding.

In June 2018, System Energy and Entergy Services filed a motion to dismiss and an answer to the LPSC complaint denying that System Energy’s treatment of the sale-leaseback renewal and capital additions violated the terms of the filed rate or any other FERC ratemaking, accounting, or legal requirements or otherwise constituted double recovery. The response also argued that the complaint is inconsistent with a FERC-approved settlement to which the LPSC is a party and that explicitly authorizes System Energy to recover its lease payments. Finally, the response argued that both the capital additions and the sale-leaseback renewal were prudent investments and the LPSC complaint fails to justify any disallowance or refunds. The response also offered to submit formula rate protocols for the Unit Power Sales Agreement similar to the procedures used for reviewing transmission rates under the MISO tariff. In September 2018 the FERC issued an order setting the complaint for hearing and settlement proceedings. The FERC established a refund effective date of May 18, 2018.

In February 2019 the presiding ALJ ruled that the hearing ordered by the FERC includes the issue of whether specific subcategories of accumulated deferred income tax should be included in, or excluded from, System Energy’s formula rate. In March 2019 the LPSC, MPSC, APSC and City Council filed direct testimony. The LPSC testimony sought refunds that include the renewal lease payments (approximately $17.2 million per year since July 2015), rate base reductions for accumulated deferred income tax associated with uncertain tax positions, and the cost of capital additions associated with the sale-leaseback interest, as well as interest on those amounts.

In June 2019 System Energy filed answering testimony arguing that the FERC should reject all claims for refunds.  Among other things, System Energy argued that claims for refunds of the costs of lease renewal payments and capital additions should be rejected because those costs were recovered consistent with the Unit Power Sales Agreement formula rate, System Energy was not over or double recovering any costs, and ratepayers will save costs over the initial and renewal terms of the leases.  System Energy argued that claims for refunds associated with liabilities arising from uncertain tax positions should be rejected because the liabilities do not provide cost-free capital, the repayment timing of the liabilities is uncertain, and the outcome of the underlying tax positions is uncertain.  System Energy’s testimony also challenged the refund calculations supplied by the other parties.

In August 2019 the FERC trial staff filed direct and answering testimony seeking refunds for rate base reductions for liabilities associated with uncertain tax positions. The FERC trial staff also argued that System Energy recovered $32 million more than it should have in depreciation expense for capital additions. In September 2019, System Energy filed cross-answering testimony disputing the FERC trial staff’s arguments for refunds, stating that the FERC trial staff’s position regarding depreciation rates for capital additions is not unreasonable, but
explaining that any change in depreciation expense is only one element of a Unit Power Sales Agreement re-billing calculation. Adjustments to depreciation expense in any re-billing under the Unit Power Sales Agreement formula rate will also involve changes to accumulated depreciation, accumulated deferred income taxes, and other formula elements as needed. In October 2019 the LPSC filed rebuttal testimony increasing the amount of refunds sought for liabilities associated with uncertain tax positions.  The LPSC seeks approximately $512 million plus interest, which is approximately $216 million through December 31, 2021.  The FERC trial staff also filed rebuttal testimony in which it seeks refunds of a similar amount as the LPSC for the liabilities associated with uncertain tax positions.  The LPSC testimony also argued that adjustments to depreciation rates should affect rate base on a prospective basis only.

A hearing was held before a FERC ALJ in November 2019. In April 2020 the ALJ issued the initial decision. Among other things, the ALJ determined that refunds were due on three main issues. First, with regard to the lease renewal payments, the ALJ determined that System Energy is recovering an unjust acquisition premium through the lease renewal payments, and that System Energy’s recovery from customers through rates should be limited to the cost of service based on the remaining net book value of the leased assets, which is approximately $70 million. The ALJ found that the remedy for this issue should be the refund of lease payments (approximately $17.2 million per year since July 2015) with interest determined at the FERC quarterly interest rate, which would be offset by the addition of the net book value of the leased assets in the cost of service. The ALJ did not calculate a value for the refund expected as a result of this remedy. In addition, System Energy would no longer recover the lease payments in rates prospectively. Second, with regard to the liabilities associated with uncertain tax positions, the ALJ determined that the liabilities are accumulated deferred income taxes and that System Energy’s rate base should have been reduced for those liabilities. If the ALJ’s initial decision is upheld, the estimated refund for this issue through December 31, 2021, is approximately $422 million, plus interest, which is approximately $128 million through December 31, 2021. The ALJ also found that System Energy should include liabilities associated with uncertain tax positions as a rate base reduction going forward. Third, with regard to the depreciation expense adjustments, the ALJ found that System Energy should correct for the error in re-billings retroactively and prospectively, but that System Energy should not be permitted to recover interest on any retroactive return on enhanced rate base resulting from such corrections. If the initial decision is affirmed on this issue, System Energy estimates refunds of approximately $19 million, which includes interest through December 31, 2021.

The ALJ initial decision is an interim step in the FERC litigation process, and an ALJ’s determinations made in an initial decision are not controlling on the FERC. The ALJ in the initial decision acknowledges that these are issues of first impression before the FERC. In June 2020, System Energy, the LPSC, and the FERC trial staff filed briefs on exceptions, challenging several of the initial decision’s findings. System Energy’s brief on exceptions challenged the initial decision’s limitations on recovery of the lease renewal payments, its proposed rate base refund for the liabilities associated with uncertain tax positions, and its proposal to asymmetrically treat interest on bill corrections for depreciation expense adjustments. The LPSC’s and the FERC trial staff’s briefs on exceptions each challenged the initial decision’s allowance for recovery of the cost of service associated with the lease renewal based on the remaining net book value of the leased assets, its calculation of the remaining net book value of the leased assets, and the amount of the initial decision’s proposed rate base refund for the liabilities associated with uncertain tax positions. The LPSC’s brief on exceptions also challenged the initial decision’s proposal that depreciation expense adjustments include retroactive adjustments to rate base and its finding that section 203 of the Federal Power Act did not apply to the lease renewal. The FERC trial staff’s brief on exceptions also challenged the initial decision’s finding that the FERC need not institute a formal investigation into System Energy’s tariff. In October 2020, System Energy, the LPSC, the MPSC, the APSC, and the City Council filed briefs opposing exceptions. System Energy opposed the exceptions filed by the LPSC and the FERC trial staff. The LPSC, MPSC, APSC, City Council, and the FERC trial staff opposed the exceptions filed by System Energy. Also in October 2020 the MPSC, APSC, and the City Council filed briefs adopting the exceptions of the LPSC and the FERC trial staff. The case is pending before the FERC, which will review the case and issue an order on the proceeding, and the FERC may accept, reject, or modify the ALJ’s initial decision in whole or in part. Refunds, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.
In addition, in September 2020, the IRS issued a Notice of Proposed Adjustment (NOPA) and Entergy executed it. The NOPA memorializes the IRS’s decision to adjust the 2015 consolidated federal income tax return of Entergy Corporation and certain of its subsidiaries, including System Energy, with regard to the uncertain decommissioning tax position. Pursuant to the audit resolution documented in the NOPA, the IRS allowed System Energy’s inclusion of $102 million of future nuclear decommissioning costs in System Energy’s cost of goods sold for the 2015 tax year, roughly 10% of the requested deduction, but disallowed the balance of the position. In September 2020, System Energy filed a motion to lodge the NOPA into the record in the FERC proceeding. In October 2020 the LPSC, the APSC, the MPSC, the City Council, and the FERC trial staff filed oppositions to System Energy’s motion. As a result of the NOPA issued by the IRS in September 2020, System Energy filed, in October 2020, a new Federal Power Act section 205 filing at FERC to establish an ongoing rate base credit for the accumulated deferred income taxes resulting from the decommissioning uncertain tax position. On a prospective basis beginning with the October 2020 bill, System Energy proposes to include the accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position as a credit to rate base under the Unit Power Sales Agreement. In November 2020 the LPSC, APSC, MPSC, and City Council filed a protest to the filing, and System Energy responded.

In November 2020 the IRS issued a Revenue Agent’s Report (RAR) for the 2014/2015 tax year and in December 2020 Entergy executed it. The RAR contained the same adjustment to the uncertain nuclear decommissioning tax position as that which the IRS had announced in the NOPA. In December 2020, System Energy filed a motion to lodge the RAR into the record in the FERC proceeding addressing the uncertain tax position rate base issue. In January 2021 the LPSC, APSC, MPSC, and City Council filed a protest to the motion.

As a result of the RAR, in December 2020, System Energy filed amendments to its new Federal Power Act section 205 filings to establish an ongoing rate base credit for the accumulated deferred income taxes resulting from the decommissioning uncertain tax position and to credit excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position. The amendments both propose the inclusion of the RAR as support for the filings. In December 2020 the LPSC, APSC, and City Council filed a protest in response to the amendments, reiterating their prior objections to the filings. In February 2021 the FERC issued an order accepting System Energy’s Federal Power Act section 205 filings subject to refund, setting them for hearing, and holding the hearing in abeyance.

In December 2020, System Energy filed a new Federal Power Act section 205 filing to provide a one-time, historical credit of $25.2 million for the accumulated deferred income taxes that would have been created by the decommissioning uncertain tax position if the IRS’s decision had been known in 2016. In January 2021 the LPSC, APSC, MPSC, and City Council filed a protest to the filing. In February 2021 the FERC issued an order accepting System Energy’s Federal Power Act section 205 filing subject to refund, setting it for hearing, and holding the hearing in abeyance. The one-time credit was made during the first quarter 2021.

LPSC Authorization of Additional Complaints

In May 2020 the LPSC authorized its staff to file additional complaints at the FERC related to the rates charged by System Energy for Grand Gulf energy and capacity supplied to Entergy Louisiana under the Unit Power Sales Agreement. The LPSC directive notes that the initial decision issued by the presiding ALJ in the Grand Gulf sale-leaseback complaint proceeding did not address, for procedural reasons, certain rate issues raised by the LPSC and declined to order further investigation of rates charged by System Energy. The LPSC directive authorizes its staff to file complaints at the FERC “necessary to address these rate issues, to request a full investigation into the rates charged by System Energy for Grand Gulf power, and to seek rate refund, rate reduction, and such other remedies as may be necessary and appropriate to protect Louisiana ratepayers.” The LPSC directive further stated that the LPSC has seen “information suggesting that the Grand Gulf plant has been significantly underperforming compared to other nuclear plants in the United States, has had several extended and unexplained outages, and has been plagued with serious safety concerns.” The LPSC expressed concern that the costs paid by Entergy
Louisiana's retail customers may have been detrimentally impacted, and authorized “the filing of a FERC complaint to address these performance issues and to seek appropriate refund, rate reduction, and other remedies as may be appropriate.”

Unit Power Sales Agreement Complaint

The first of the additional complaints was filed by the LPSC, the APSC, the MPSC, and the City Council in September 2020. The complaint raises two sets of rate allegations: violations of the filed rate and a corresponding request for refunds for prior periods; and elements of the Unit Power Sales Agreement are unjust and unreasonable and a corresponding request for refunds for the 15-month refund period and changes to the Unit Power Sales Agreement prospectively. Several of the filed rate allegations overlap with the previous complaints. The filed rate allegations not previously raised are that System Energy: failed to provide a rate base credit to customers for the “time value” of sale-leaseback lease payments collected from customers in advance of the time those payments were due to the owner-lessors; improperly included certain lease refinancing costs in rate base as prepayments; improperly included nuclear decommissioning outage costs in rate base; failed to include categories of accumulated deferred income taxes as a reduction to rate base; charged customers based on a higher equity ratio than would be appropriate due to excessive retained earnings; and did not correctly reflect money pool investments and imprudently invested cash into the money pool. The elements of the Unit Power Sales Agreement that the complaint alleges are unjust and unreasonable include: incentive and executive compensation, lack of an equity re-opener, lobbying, and private airplane travel. The complaint also requests a rate investigation into the Unit Power Sales Agreement and System Energy’s billing practices pursuant to section 206 of the Federal Power Act, including any issue relevant to the Unit Power Sales Agreement and its inputs. System Energy filed its answer opposing the complaint in November 2020. In its answer, System Energy argued that all of the claims raised in the complaint should be dismissed and agreed that bill adjustment with respect to two discrete issues were justified. System Energy argued that dismissal is warranted because all claims fall into one or more of the following categories: the claims have been raised and are being litigated in another proceeding; the claims do not present a prima facie case and do not satisfy the threshold burden to establish a complaint proceeding; the claims are premised on a theory or request relief that is incompatible with federal law or FERC policy; the claims request relief that is inconsistent with the filed rate; the claims are barred or waived by the legal doctrine of laches; and/or the claims have been fully addressed and do not warrant further litigation. In December 2020, System Energy filed a bill adjustment report indicating that $3.4 million had been credited to customers in connection with the two discrete issues concerning the inclusion of certain accumulated deferred income taxes balances in rates. In January 2021 the complainants filed a response to System Energy’s November 2020 answer, and in February 2021, System Energy filed a response to the complainant’s response.

In May 2021 the FERC issued an order addressing the complaint, establishing a refund effective date of September 21, 2020, establishing hearing procedures, and holding those procedures in abeyance pending FERC’s review of the initial decision in the Grand Gulf sale-leaseback renewal complaint discussed above. System Energy agreed that the hearing should be held in abeyance but sought rehearing of FERC’s decision as related to matters set for hearing that were beyond the scope of FERC’s jurisdiction or authority. The complainants sought rehearing of FERC’s decision to hold the hearing in abeyance and filed a motion to proceed, which motion System Energy subsequently opposed. In June 2021, System Energy’s request for rehearing was denied by operation of law, and System Energy filed an appeal of FERC’s orders in the Court of Appeals for the Fifth Circuit. The appeal was initially stayed for a period of 90 days, but the stay expired. In November 2021 the Fifth Circuit dismissed the appeal as premature.

In August 2021 the FERC issued an order addressing System Energy’s and the complainants’ rehearing requests. The FERC dismissed part of the complaint seeking an equity re-opener, maintained the abeyance for issues related to the proceeding addressing the sale-leaseback renewal and uncertain tax positions, lifted the abeyance for issues unrelated to that proceeding, and clarified the scope of the hearing. A procedural schedule was established, with the hearing scheduled for June 2022 and the ALJ’s initial decision scheduled for November 2022. Discovery is ongoing.
In November 2021 the LPSC, APSC, and City Council filed direct testimony and requested the FERC to order refunds for prior periods and prospective amendments to the Unit Power Sales Agreement. The LPSC’s refund claims include, among other things, allegations that: (1) System Energy should not have included certain sale-leaseback transaction costs in prepayments; (2) System Energy should have credited rate base to reflect the time value of money associated with the advance collection of lease payments; (3) System Energy incorrectly included refueling outage costs that were recorded in account 174 in rate base; and (4) System Energy should have excluded several accumulated deferred income tax balances in account 190 from rate base. The LPSC is also seeking a retroactive adjustment to retained earnings and capital structure in conjunction with the implementation of its proposed refunds. In addition, the LPSC seeks amendments to the Unit Power Sales Agreement going forward to address below-the-line costs, incentive compensation, the working capital allowance, litigation expenses, and the 2019 termination of the capital funds agreement. The APSC argues that: (1) System Energy should have included borrowings from the Entergy System money pool in its determination of short-term debt in its cost of capital; and (2) System Energy should credit customers with System Energy’s allocation of earnings on money pool investments. The City Council alleges that System Energy has maintained excess cash on hand in the money pool and that retention of excess cash was imprudent. Based on this allegation, the City Council’s witness recommends a refund of approximately $98.8 million for the period 2004-September 2021 or other alternative relief. The City Council further recommends that the FERC impose a hypothetical equity ratio such as 48.15% equity to capital on a prospective basis.

In January 2022, System Energy filed answering testimony arguing that the FERC should not order refunds for prior periods or any prospective amendments to the Unit Power Sales Agreement. In response to the LPSC’s refund claims, System Energy argues, among other things, that (1) the inclusion of sale-leaseback transaction costs in prepayments was correct; (2) that the filed rate doctrine bars the request for a retroactive credit to rate base for the time value of money associated with the advance collection of lease payments; (3) that an accounting misclassification for deferred refueling outage costs has been corrected, caused no harm to customers, and requires no refunds; and (4) that its accounting and ratemaking treatment of specified accumulated deferred income tax balances in account 190 has been correct. System Energy further responds that no retroactive adjustment to retained earnings or capital structure should be ordered because there is no general policy requiring such a remedy and there was no showing that the retained earnings element of the capital structure was incorrectly implemented. Further, System Energy presented evidence that all of the costs that are being challenged were long known to the retail regulators and were approved by them for inclusion in retail rates, and the attempt to retroactively challenge these costs, some of which have been included in rates for decades, is unjust and unreasonable. In response to the LPSC’s proposed going-forward adjustments, System Energy presents evidence to show that none of the proposed adjustments are needed. On the issue of below-the-line expenses, during discovery procedures System Energy identified a historical allocation error in certain months and agreed to provide a bill credit to customers to correct the error. In response to the APSC’s claims, System Energy argues that the Unit Power Sales Agreement does not include System Energy’s borrowings from the Entergy System money pool or earnings on deposits to the Entergy System money pool in the determination of the cost of capital; and accordingly, no refunds are appropriate on those issues. In response to the City Council’s claims, System Energy argues that it has reasonably managed its cash and that the City Council’s theory of cash management is defective because it fails to adequately consider the relevant cash needs of System Energy and it makes faulty presumptions about the operation of the Entergy System money pool. System Energy further points out that the issue of its capital structure is already subject to pending FERC litigation.

Grand Gulf Prudence Complaint

The second of the additional complaints was filed at the FERC in March 2021 by the LPSC, the APSC, and the City Council against System Energy, Entergy Services, Entergy Operations, and Entergy Corporation. The second complaint contains two primary allegations. First, it alleges that, based on the plant’s capacity factor and alleged safety performance, System Energy and the other respondents imprudently operated Grand Gulf during the period 2016-2020, and it seeks refunds of at least $360 million in alleged replacement energy costs, in addition to other costs, including those that can only be identified upon further investigation. Second, it alleges that the
performance and/or management of the 2012 extended power uprate of Grand Gulf was imprudent, and it seeks refunds of all costs of the 2012 uprate that are determined to result from imprudent planning or management of the project. In addition to the requested refunds, the complaint asks that the FERC modify the Unit Power Sales Agreement to provide for full cost recovery only if certain performance indicators are met and to require pre-authorization of capital improvement projects in excess of $125 million before related costs may be passed through to customers in rates. In April 2021, System Energy and the other respondents filed their motion to dismiss and answer to the complaint. System Energy requested that the FERC dismiss the claims within the complaint. With respect to the claim concerning operations, System Energy argues that the complaint does not meet its legal burden because, among other reasons, it fails to allege any specific imprudent conduct. With respect to the claim concerning the uprate, System Energy argues that the complaint fails because, among other reasons, the complainants’ own conduct prevents them from raising a serious doubt as to the prudence of the uprate. System Energy also requests that the FERC dismiss other elements of the complaint, including the proposed modifications to the Unit Power Sales Agreement, because they are not warranted. Additional responsive pleadings were filed by the complainants and System Energy during the period from March through July 2021. The pleadings are pending FERC action.
Storm Cost Recovery Filings with Retail Regulators

Entergy Louisiana

Hurricane Laura, Hurricane Delta, Hurricane Zeta, Winter Storm Uri, and Hurricane Ida

In August 2020 and October 2020, Hurricane Laura, Hurricane Delta, and Hurricane Zeta caused significant damage to portions of Entergy Louisiana’s service area. The storms resulted in widespread outages, significant damage to distribution and transmission infrastructure, and the loss of sales during the outages. Additionally, as a result of Hurricane Laura’s extensive damage to the grid infrastructure serving the impacted area, large portions of the underlying transmission system required nearly a complete rebuild.

In October 2020, Entergy Louisiana filed an application at the LPSC seeking approval of certain ratemaking adjustments in connection with the issuance of shorter-term mortgage bonds to provide interim financing for restoration costs associated with Hurricane Laura, Hurricane Delta, and Hurricane Zeta. Subsequently, Entergy Louisiana and the LPSC staff filed a joint motion seeking approval to exclude from the derivation of Entergy Louisiana’s capital structure and cost rate of debt for ratemaking purposes, including the allowance for funds used during construction, shorter-term debt up to $1.1 billion issued by Entergy Louisiana to fund costs associated with Hurricane Laura, Hurricane Delta, and Hurricane Zeta costs on an interim basis. In November 2020 the LPSC issued an order approving the joint motion, and Entergy Louisiana issued $1.1 billion of 0.62% Series mortgage bonds due November 2023. Also in November 2020, Entergy Louisiana withdrew $257 million from its funded storm reserves.

In February 2021 two winter storms (collectively, Winter Storm Uri) brought freezing rain and ice to Louisiana. Ice accumulation sagged or downed trees, limbs and power lines, causing damage to Entergy Louisiana’s transmission and distribution systems. The additional weight of ice caused trees and limbs to fall into power lines and other electric equipment. When the ice melted, it affected vegetation and electrical equipment, causing additional outages. As discussed above in “Fuel and purchased power recovery,” Entergy Louisiana recovered the incremental fuel costs associated with Winter Storm Uri over a five-month period from April 2021 through August 2021.

In April 2021, Entergy Louisiana filed an application with the LPSC relating to Hurricane Laura, Hurricane Delta, Hurricane Zeta, and Winter Storm Uri restoration costs and in July 2021, Entergy Louisiana made a supplemental filing updating the total restoration costs. Total restoration costs for the repair and/or replacement of Entergy Louisiana’s electric facilities damaged by these storms are currently estimated to be approximately $2.06 billion, including approximately $1.68 billion in capital costs and approximately $380 million in non-capital
costs. Including carrying costs through January 2022, Entergy Louisiana is seeking an LPSC determination that $2.11 billion was prudently incurred and, therefore, is eligible for recovery from customers. Additionally, Entergy Louisiana is requesting that the LPSC determine that re-establishment of a storm escrow account to the previously authorized amount of $290 million is appropriate. In July 2021, Entergy Louisiana supplemented the application with a request regarding the financing and recovery of the recoverable storm restoration costs. Specifically, Entergy Louisiana requested approval to securitize its restoration costs pursuant to Louisiana Act 55 financing, as supplemented by Act 293 of the Louisiana Legislature’s Regular Session of 2021. As previously discussed, in August 2021, Hurricane Ida caused extensive damage to Entergy Louisiana’s distribution and, to a lesser extent, transmission systems resulting in widespread power outages. In September 2021, Entergy Louisiana supplemented the application with a request to establish and securitize a $1 billion restricted storm escrow account for Hurricane Ida related restoration costs, subject to a subsequent prudence review. In total, Entergy Louisiana requested authorization for the issuance of system restoration bonds in one or more series in an aggregate principal amount of $3.18 billion, which includes the costs of re-establishing and funding a storm damage escrow account, carrying costs and unamortized debt costs on interim financing, and issuance costs. After filing of testimony by LPSC staff and intervenors, which generally supported or did not oppose Entergy Louisiana’s requests, the parties negotiated and executed an uncontested stipulated settlement which was filed with the LPSC in February 2022. The settlement agreement contains the following key terms: $2.1 billion of restoration costs from Hurricane Laura, Hurricane Delta, Hurricane Zeta, and Winter Storm Uri were prudently incurred and are eligible for recovery; carrying costs of $51 million are recoverable; a $290 million cash storm reserve should be re-established; a $1 billion reserve should be established to partially pay for Hurricane Ida restoration costs; and Entergy Louisiana is authorized to finance $3.186 billion utilizing the securitization process authorized by Act 55, as supplemented by Act 293. The LPSC voted to approve the settlement at its February 2022 meeting.

Hurricane Isaac

In August 2012, Hurricane Isaac caused extensive damage to Entergy Louisiana’s service area.  In June 2014 the LPSC authorized Entergy Louisiana to utilize Louisiana Act 55 financing for Hurricane Isaac system restoration costs.  Entergy Louisiana committed to pass on to customers a minimum of $30.8 million of customer benefits through annual customer credits of approximately $6.2 million for five years. Approvals for the Act 55 financings were obtained from the Louisiana Utilities Restoration Corporation (LURC) and the Louisiana State Bond Commission.

In August 2014 the Louisiana Local Government Environmental Facilities and Community Development Authority (LCDA) issued $314.85 million in bonds under Louisiana Act 55.  From the $309 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $16 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $293 million directly to Entergy Louisiana.  Entergy Louisiana used the $293 million received from the LURC to acquire 2,935,152.69 Class C preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 7.5% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2014, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement. The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1.75 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

In the first quarter 2020, Entergy and the IRS agreed upon and settled on the treatment of funds received by Entergy Louisiana in conjunction with the Act 55 financing of Hurricane Isaac storm costs, which resulted in a net reduction of income tax expense of approximately $32 million. As a result of the settlement, the position was
partially sustained and Entergy Louisiana recorded a reduction of income tax expense of approximately $58 million primarily due to the reversal of liabilities for uncertain tax positions in excess of the agreed-upon settlement. Entergy recorded an increase to income tax expense of $26 million primarily resulting from the reduction of the deferred tax asset, associated with utilization of the net operating loss as a result of the settlement. This adjustment recorded by Entergy also accounted for the tax rate change of the Tax Cuts and Jobs Act. As a result of the IRS settlement, Entergy Louisiana recorded a $29 million ($21 million net-of-tax) regulatory charge and a corresponding regulatory liability to reflect its obligation to customers pursuant to the LPSC Hurricane Isaac Act 55 financing order.

Hurricane Gustav and Hurricane Ike

In September 2008, Hurricane Gustav and Hurricane Ike caused catastrophic damage to Entergy Louisiana’s service territory.  In December 2009, Entergy Louisiana entered into a stipulation agreement with the LPSC staff regarding its storm costs.  In March and April 2010, Entergy Louisiana and other parties to the proceeding filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal to utilize Act 55 financing, which included a commitment to pass on to customers a minimum of $43.3 million of customer benefits through a prospective annual rate reduction of $8.7 million for five years.  In April 2010 the LPSC approved the settlement and subsequently issued financing orders and a ratemaking order intended to facilitate the implementation of the Act 55 financings.  In June 2010 the Louisiana State Bond Commission approved the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricane Gustav and Hurricane Ike was reduced by $2.7 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2010 the LCDA issued two series of bonds totaling $713.0 million under Act 55.  From the $702.7 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $290 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $412.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana used $412.7 million to acquire 4,126,940.15 Class B preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 9% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2010, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA, and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

Hurricane Katrina and Hurricane Rita

In August and September 2005, Hurricanes Katrina and Rita caused catastrophic damage to Entergy Louisiana’s service territory. In March 2008, Entergy Louisiana and the LURC filed at the LPSC an application requesting that the LPSC grant a financing order authorizing the financing of Entergy Louisiana storm costs, storm reserves, and issuance costs pursuant to Louisiana Act 55.  Entergy Louisiana also filed an application requesting LPSC approval for ancillary issues including the mechanism to flow charges and savings to customers via a storm cost offset rider.  In April 2008 the Louisiana Public Facilities Authority (LPFA), which is the issuer of the bonds
pursuant to the Act 55 financing, approved requests for the Act 55 financing.  Also in April 2008, Entergy Louisiana and the LPSC staff filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal under the Act 55 financing, which included a commitment to pass on to customers a minimum of $40 million of customer benefits through a prospective annual rate reduction of $8 million for five years.  The LPSC subsequently approved the settlement and issued two financing orders and one ratemaking order intended to facilitate implementation of the Act 55 financing.  In May 2008 the Louisiana State Bond Commission granted final approval of the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricanes Katrina and Rita was reduced by $22.3 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2008 the LPFA issued $687.7 million in bonds under the aforementioned Act 55.  From the $679 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $152 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $527 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $545 million, including $17.8 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 5,449,861.85 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 10% annual distribution rate.  In August 2008 the LPFA issued $278.4 million in bonds under the aforementioned Act 55.  From the $274.7 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $87 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $187.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $189.4 million, including $1.7 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 1,893,918.39 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC that carry a 10% annual distribution rate.  Distributions are payable quarterly commencing on September 15, 2008 and have a liquidation price of $100 per unit.  The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.  

The bonds were repaid in 2018. Entergy and Entergy Louisiana did not report the bonds issued by the LPFA on their balance sheets because the bonds are the obligation of the LPFA, and there was no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collected a system restoration charge on behalf of the LURC and remitted the collections to the bond indenture trustee.  Entergy and Entergy Louisiana did not report the collections as revenue because Entergy Louisiana was merely acting as the billing and collection agent for the state.

Entergy Mississippi

Entergy Mississippi has approval from the MPSC to collect a storm damage provision of $1.75 million per month. If Entergy Mississippi’s accumulated storm damage provision balance exceeds $15 million, the collection of the storm damage provision ceases until such time that the accumulated storm damage provision becomes less than $10 million. Entergy Mississippi’s storm damage provision balance has been less than $10 million since May 2019, and Entergy Mississippi has been billing the monthly storm damage provision since July 2019.
Entergy New Orleans

Hurricane Zeta

In October 2020, Hurricane Zeta caused significant damage to Entergy New Orleans’s service area. The storm resulted in widespread power outages, significant damage to distribution and transmission infrastructure, and the loss of sales during the power outages. In March 2021, Entergy New Orleans withdrew $44 million from its funded storm reserves. In May 2021, Entergy New Orleans filed an application with the City Council requesting approval and certification that its system restoration costs associated with Hurricane Zeta of approximately $36 million, including approximately $28 million in capital costs and approximately $8 million in non-capital costs, were reasonable and necessary to enable Entergy New Orleans to restore electric service to its customers and Entergy New Orleans’s electric utility infrastructure.

Entergy Texas

Hurricane Laura, Hurricane Delta, and Winter Storm Uri

In August 2020 and October 2020, Hurricane Laura and Hurricane Delta caused extensive damage to Entergy Texas’s service area. In February 2021, Winter Storm Uri also caused damage to Entergy Texas’s service area. The storms resulted in widespread power outages, significant damage primarily to distribution and transmission infrastructure, and the loss of sales during the power outages. In April 2021, Entergy Texas filed an application with the PUCT requesting a determination that approximately $250 million of system restoration costs associated with Hurricane Laura, Hurricane Delta, and Winter Storm Uri, including approximately $200 million in capital costs and approximately $50 million in non-capital costs, were reasonable and necessary to enable Entergy Texas to restore electric service to its customers and Entergy Texas’s electric utility infrastructure. The filing also included the projected balance of approximately $13 million of a regulatory asset containing previously approved system restoration costs related to Hurricane Harvey. In September 2021 the parties filed an unopposed settlement agreement, pursuant to which Entergy Texas removed from the amount to be securitized approximately $4.3 million that will instead be charged to its storm reserve, $5 million related to no particular issue, of which Entergy Texas would be permitted to seek recovery in a future proceeding, and approximately $300 thousand related to attestation costs. In December 2021 the PUCT issued an order approving the unopposed settlement and determining system restoration costs of $243 million related to Hurricane Laura, Hurricane Delta, and Winter Storm Uri and the $13 million projected remaining balance of the Hurricane Harvey system restoration costs were eligible for securitization. The order also determines that Entergy Texas can recover carrying costs on the system restoration costs related to Hurricane Laura, Hurricane Delta, and Winter Storm Uri.

In July 2021, Entergy Texas filed with the PUCT an application for a financing order to approve the securitization of the system restoration costs that are the subject of the April 2021 application. In November 2021 the parties filed an unopposed settlement agreement supporting the issuance of a financing order consistent with Entergy Texas’s application and with minor adjustments to certain upfront and ongoing costs to be incurred to facilitate the issuance and serving of system restoration bonds. In January 2022 the PUCT issued a financing order consistent with the unopposed settlement.
Entergy New Orleans [Member]  
Rate And Regulatory Matters RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)
Regulatory Assets and Regulatory Liabilities

Regulatory assets represent probable future revenues associated with costs that Entergy expects to recover from customers through the regulatory ratemaking process under which the Utility business operates. Regulatory liabilities represent probable future reductions in revenues associated with amounts that Entergy expects to benefit customers through the regulatory ratemaking process under which the Utility business operates. In addition to the regulatory assets and liabilities that are specifically disclosed on the face of the balance sheets, the tables below provide detail of “Other regulatory assets” and “Other regulatory liabilities” that are included on Entergy’s and the Registrant Subsidiaries’ balance sheets as of December 31, 2021 and 2020:

Other Regulatory Assets

Entergy
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
$2,327.7 $3,027.5 
Removal costs (Note 9)
1,488.8 893.8 
Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 2 - Hurricane Ida and Storm Cost Recovery Filings with Retail Regulators and Note 5 - Securitization Bonds)
993.6 379.2 
Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
935.5 1,018.9 
Retired electric and gas meters - recovered through retail rates as determined by retail regulators
179.4 192.1 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
133.1 105.7 
Opportunity Sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding) (b)
131.8 131.8 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
113.2 16.9 
Unamortized loss on reacquired debt - recovered over term of debt
74.7 79.2 
Retail rate deferrals - recovered through formula rates or rate riders as rates are redetermined by retail regulators
66.1 66.0 
Attorney General litigation costs - recovered over a six-year period through March 2026 (b)
20.5 25.3 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
19.0 — 
New nuclear generation development costs - recovery through formula rate plan December 2014 through November 2022 (b)
6.8 14.2 
Other123.1 125.9 
Entergy Total$6,613.3 $6,076.5 
Entergy Arkansas
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
$640.0 $831.5 
Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
489.2 479.3 
Removal costs (Note 9)
224.3 212.6 
Opportunity sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding) (b)
131.8 131.8 
Retired electric meters - recovered over 15-year period through March 2034
43.4 46.9 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
39.8 9.5 
Storm damage costs - recovered either through securitization or retail rates (Note 5 - Entergy Arkansas Securitization Bonds)
39.3 42.7 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
32.6 10.5 
Unamortized loss on reacquired debt - recovered over term of debt
23.1 24.7 
ANO Fukushima and Flood Barrier costs - recovered through retail rates through February 2026 (Note 2 - Retail Rate Proceedings) (b)
7.3 9.1 
Retail rate deferrals - recovered through rate riders as rates are redetermined annually (b)
1.0 12.6 
Other17.9 21.2 
Entergy Arkansas Total$1,689.7 $1,832.4 
Entergy Louisiana
 20212020
 (In Millions)
Removal costs (Note 9)
$848.2 $302.5 
Storm damage costs, including hurricane costs - recovery expected through retail rates and securitization (Note 2 - Hurricane Ida and Storm Cost Recovery Filings with Retail Regulators)
773.6 94.0 
Pension & postretirement costs (Note 11 - Qualified Pension Plans and Non-Qualified Pension Plans) (a)
592.7 799.4 
Asset Retirement Obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
286.6 299.0 
Retired electric meters - recovered over a 22-year period through July 2041
91.7 96.4 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
56.3 48.8 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
55.0 5.4 
Unamortized loss on reacquired debt - recovered over term of debt
26.9 26.6 
New nuclear generation development costs - recovery through formula rate plan December 2014 through November 2022 (b)
6.7 14.0 
Other39.0 40.0 
Entergy Louisiana Total$2,776.7 $1,726.1 

Entergy Mississippi
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
$175.4 $242.7 
Removal costs (Note 9)
136.8 107.3 
Retail rate deferrals - returned through formula rates or rate riders as rates are redetermined annually
48.1 44.3 
Attorney General litigation costs - recovered over a six-year period through March 2026 (b)
20.5 25.3 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
19.0 — 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
15.0 19.2 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
13.8 2.0 
Unamortized loss on reacquired debt - recovered over term of debt
12.2 13.5 
Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
8.4 7.9 
Other13.2 5.1 
Entergy Mississippi Total$462.4 $467.3 
Entergy New Orleans
 20212020
 (In Millions)
Removal costs (Note 9)
$91.7 $63.2 
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
44.9 75.7 
Storm damage costs, including hurricane costs - recovered through securitization or retail rates (Note 2 - Storm Cost Recovery Filings with Retail Regulators and Note 5 - Entergy New Orleans Securitization Bonds - Hurricane Isaac)
31.2 55.2 
Retired meters - recovered over a 12-year period through July 2031 (b)
19.6 21.7 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
17.4 14.3 
Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
5.4 5.2 
Unamortized loss on reacquired debt - recovered over term of debt
1.6 1.9 
Other36.8 29.6 
Entergy New Orleans Total$248.6 $266.8 

Entergy Texas
 20212020
 (In Millions)
Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 2 - Storm Cost Recovery Filings with Retail Regulators and Note 5 - Entergy Texas Securitization Bonds - Hurricane Rita and Entergy Texas Securitization Bonds - Hurricane Ike and Hurricane Gustav)
$143.1 $187.3 
Removal costs (Note 9)
98.1 115.3 
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
96.0 140.1 
Retired electric meters - recovered over 13-year period through February 2032
23.7 26.0 
Neches and Sabine costs - recovered over a 10-year period through September 2028 (Note 2 - Retail Rate Proceedings)
16.4 18.8 
Pension & postretirement benefits expense deferral - recovery period to be determined (Note 11 - Entergy Texas Reserve)
14.6 3.8 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
11.7 12.9 
Unamortized loss on reacquired debt - recovered over term of debt
9.8 10.5 
Other7.9 10.0 
Entergy Texas Total$421.3 $524.7 
System Energy
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans and Other Postretirement Benefits) (a)
$160.3 $217.8 
Asset retirement obligation - recovery dependent upon timing of decommissioning (Note 9) (a)
144.4 226.3 
Removal costs - recovered through depreciation rates (Note 9)
89.7 92.9 
Unamortized loss on reacquired debt - recovered over term of debt
1.1 2.0 
System Energy Total$395.5 $539.0 

(a)Does not earn a return on investment, but is offset by related liabilities.
(b)Does not earn a return on investment.

Hurricane Ida

In August 2021, Hurricane Ida caused extensive damage to the Entergy distribution and, to a lesser extent, transmission systems across Louisiana resulting in widespread power outages. Total restoration costs for the repair and/or replacement of the electrical system damaged by Hurricane Ida for Entergy Louisiana and Entergy New Orleans are currently estimated to be approximately $2.7 billion. Also, Utility revenues in 2021 were adversely affected by extended power outages resulting from the hurricane.

Entergy has recorded accounts payable for the estimated costs incurred that were necessary to return customers to service. Entergy recorded corresponding regulatory assets of approximately $1.1 billion, including $1 billion at Entergy Louisiana and $80 million at Entergy New Orleans, and construction work in progress of approximately $1.6 billion, including $1.5 billion at Entergy Louisiana and $120 million at Entergy New Orleans. Entergy recorded the regulatory assets in accordance with its accounting policies and based on the historic treatment of such costs in its service area because management believes that recovery through some form of regulatory mechanism is probable. There are well-established mechanisms and precedent for addressing these catastrophic events and providing for recovery of prudently incurred storm costs in accordance with applicable regulatory and legal principles. Because Entergy has not gone through the regulatory process regarding these storm costs, there is an element of risk, and Entergy is unable to predict with certainty the degree of success it may have in its recovery initiatives, the amount of restoration costs that it may ultimately recover, or the timing of such recovery.

Entergy is considering all available avenues to recover storm-related costs from Hurricane Ida, including federal government assistance and securitization financing. In September 2021, Entergy Louisiana filed an application at the LPSC seeking approval of certain ratemaking adjustments in connection with the issuance of approximately $1 billion of shorter-term mortgage bonds to provide interim financing for restoration costs associated with Hurricane Ida, which bonds were issued in October 2021. Also in September 2021, as discussed below in “Storm Cost Filings with Retail Regulators - Entergy Louisiana - Hurricane Laura, Hurricane Delta, Hurricane Zeta, Winter Storm Uri, and Hurricane Ida,” Entergy Louisiana sought approval for the creation and funding of a $1 billion restricted escrow account for Hurricane Ida restoration costs, subject to a subsequent prudence review. In September 2021, Entergy New Orleans withdrew $39 million from its funded storm reserves. Storm cost recovery or financing will be subject to review by applicable regulatory authorities. In February 2022, Entergy New Orleans filed with the City Council a securitization application requesting that the City Council review Entergy New Orleans’s storm reserve and increase the storm reserve funding level to $150 million, to be funded through securitization.
Other Regulatory Liabilities

Entergy
 20212020
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$1,993.3 $1,694.1 
Louisiana Act 55 financing savings obligation (Note 3) (b)
127.4 144.3 
Retail rate over-recovery - refunded through formula rate or rate riders as rates are redetermined annually
126.5 75.1 
Vidalia purchased power agreement (Note 8) (b)
106.2 115.7 
Grand Gulf sale-leaseback - (Note 5 - Grand Gulf Sale-Leaseback Transactions)
55.6 55.6 
Asset retirement obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
45.5 29.7 
Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4 44.4 
Internal restructuring guaranteed tax credits19.8 26.4 
Deferred tax equity partnership earnings (Note 1)
18.1 — 
Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates December 2015 through November 2024
16.0 21.5 
Advanced metering system (AMS) surcharge - return to customers dependent upon AMS spend
7.3 20.1 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
— 43.5 
Other83.7 53.5 
Entergy Total$2,643.8 $2,323.9 

Entergy Arkansas
 20212020
 (In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$685.4 $597.4 
Internal restructuring guaranteed customer credits19.8 26.4 
Retail rate rider over-recovery - refunded through rate riders as rates are redetermined annually
18.9 19.6 
Deferred tax equity partnership earnings (Note 1)
18.1 — 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
— 43.5 
Other1.1 — 
Entergy Arkansas Total$743.3 $686.9 
Entergy Louisiana
 20212020
 (In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$692.2 $567.7 
Louisiana Act 55 financing savings obligation (Note 3)
127.4 144.3 
Vidalia purchased power agreement (Note 8) (b)
106.2 115.7 
Asset retirement obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
45.5 29.7 
Retail rate rider over-recovery - refunded through rate riders as rates are determined annually
30.7 36.0 
Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates December 2015 through November 2024
16.0 21.5 
Derivative Instruments & Hedging Activities (Note 15)
11.4 — 
Other13.2 3.4 
Entergy Louisiana Total$1,042.6 $918.3 

Entergy Mississippi
 20212020
 (In Millions)
Retail rate rider over-recovery - refunded through rate riders as rates are redetermined annually
$34.2 $14.2 
Grand Gulf over-recovery - returned to customers through rate riders as rates are redetermined annually
15.1 1.0 
Other— 0.6 
Entergy Mississippi Total$49.3 $15.8 

Entergy Texas
 20212020
 (In Millions)
Retail refunds - return to customers to be determined
$22.8 $— 
Advanced metering system (AMS) surcharge - returned to customers dependent upon AMS spend
7.3 20.1 
Income tax rate change - refunded through a rate rider (Note 2 - Retail Rate Proceedings)
2.7 6.5 
Transition to competition costs - returned to customers through rate riders when rates are redetermined periodically
— 3.2 
Other 4.3 2.5 
Entergy Texas Total$37.1 $32.3 
System Energy
 20212020
 (In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$615.7 $529.0 
Grand Gulf sale-leaseback - (Note 5 - Grand Gulf Sale-Leaseback Transactions)
55.6 55.6 
Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4 44.4 
Grand Gulf sale-leaseback accumulated deferred income taxes (a)
25.6 25.7 
Entergy Mississippis accumulated accelerated Grand Gulf amortization - amortized and credited through the Unit Power Sales Agreement
3.6 10.7 
System Energy Total$744.9 $665.4 

(a)Offset by related asset.
(b)As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21% effective January 2018, the Vidalia purchased power agreement regulatory liability was reduced by $30.5 million and the Louisiana Act 55 financing savings obligation regulatory liabilities were reduced by $25 million, with corresponding increases to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

Regulatory activity regarding the Tax Cuts and Jobs Act

See the “Other Tax Matters - Tax Cuts and Jobs Act” section in Note 3 to the financial statements for discussion of the effects of the December 2017 enactment of the Tax Cuts and Jobs Act (Tax Act), including its effects on Entergy’s and the Registrant Subsidiaries’ regulatory asset/liability for income taxes.

Entergy Arkansas

Consistent with its previously stated intent to return unprotected excess accumulated deferred income taxes to customers as expeditiously as possible, Entergy Arkansas initiated a tariff proceeding in February 2018 proposing to establish a tax adjustment rider to provide retail customers with certain tax benefits of $467 million associated with the Tax Act. For the residential customer class, unprotected excess accumulated deferred income taxes were returned to customers over a 21-month period from April 2018 through December 2019. For all other customer classes, unprotected excess accumulated deferred income taxes were returned to customers over a nine-month period from April 2018 through December 2018. A true-up provision also was included in the rider, with any over- or under-returned unprotected excess accumulated deferred income taxes credited or billed to customers during the billing month of January 2020, with any residual amounts of over- or under-returned unprotected excess accumulated deferred income taxes to be flowed through Entergy Arkansas’s energy cost recovery rider. In March 2018 the APSC approved the tax adjustment rider effective with the first billing cycle of April 2018.

As discussed below, in July 2018, Entergy Arkansas made its formula rate plan filing to set its formula rate for the 2019 calendar year. A hearing was held in May 2018 regarding the APSC’s inquiries into the effects of the Tax Act, including Entergy Arkansas’s proposal to utilize its formula rate plan rider for its customers to realize the remaining benefits of the Tax Act. Entergy Arkansas’s formula rate plan rider included a netting adjustment that compared actual annual results to the allowed rate of return on common equity. In July 2018 the APSC issued an order agreeing with Entergy Arkansas’s proposal to have the effects of the Tax Act on current income tax expense flow through Entergy Arkansas’s formula rate plan rider and with Entergy Arkansas’s treatment of protected and unprotected excess accumulated deferred income taxes. The APSC also directed Entergy Arkansas to submit in the tax adjustment rider proceeding, discussed above, the adjustments to all other riders affected by the Tax Act and to include an amendment for a true up mechanism where a rider affected by the Tax Act does not already contain a
true-up mechanism. Pursuant to a 2018 settlement agreement in Entergy Arkansas’s formula rate plan proceeding, Entergy Arkansas also removed the net operating loss accumulated deferred income tax asset caused by the Tax Act from Entergy Arkansas’s tax adjustment rider. Entergy Arkansas’s compliance tariff filings were accepted by the APSC in October 2018. In February 2021, pursuant to its 2020 formula rate plan evaluation report settlement, Entergy Arkansas flowed $5.6 million in credits to customers through the tax adjustment rider based on the outcome of certain federal tax positions and a decrease in the state tax rate.

Entergy Louisiana

In an electric formula rate plan settlement approved by the LPSC in April 2018 the parties agreed that Entergy Louisiana would return to customers one-half of its eligible unprotected excess deferred income taxes from May 2018 through December 2018 and return to customers the other half from January 2019 through August 2022. In addition, the settlement provided that in order to flow back to customers certain other tax benefits created by the Tax Act, Entergy Louisiana established a regulatory liability effective January 1, 2018 in the amount of $9.1 million per month to reflect these tax benefits already included in retail rates until new base rates under the formula rate plan were established in September 2018, and this regulatory liability was returned to customers over the September 2018 through August 2019 formula rate plan rate-effective period. The LPSC staff and intervenors in the settlement reserved the right to obtain data from Entergy Louisiana to confirm the determination of excess accumulated deferred income taxes resulting from the Tax Act and the analysis thereof as part of the formula rate plan review proceeding for the 2017 test year filing which, as discussed below, Entergy Louisiana filed in June 2018.

Entergy New Orleans

After enactment of the Tax Act the City Council passed a resolution ordering Entergy New Orleans to, effective January 1, 2018, record deferred regulatory liabilities to account for the Tax Act’s effect on Entergy New Orleans’s revenue requirement and to make a filing by mid-March 2018 regarding the Tax Act’s effects on Entergy New Orleans’s operating income and rate base and potential mechanisms for customers to receive benefits of the Tax Act. The City Council’s resolution also directed Entergy New Orleans to request that Entergy Services file with the FERC for revisions of the Unit Power Sales Agreement and MSS-4 replacement tariffs to address the return of excess accumulated deferred income taxes. Entergy submitted filings of this type to the FERC.

In March 2018, Entergy New Orleans filed its response to the resolution stating that the Tax Act reduced income tax expense from what was then reflected in rates by approximately $8.2 million annually for electric operations and by approximately $1.3 million annually for gas operations. In the filing, Entergy New Orleans proposed to return to customers from June 2018 through August 2019 the benefits of the reduction in income tax expense and its unprotected excess accumulated deferred income taxes through a combination of bill credits and investments in energy efficiency programs, grid modernization, and Smart City projects. Entergy New Orleans submitted supplemental information in April 2018 and May 2018. Shortly thereafter, Entergy New Orleans and the City Council’s advisors reached an agreement in principle that provides for benefits that will be realized by Entergy New Orleans customers through bill credits that started in July 2018 and offsets to future investments in energy efficiency programs, grid modernization, and Smart City projects, as well as additional benefits related to the filings made at the FERC. The agreement in principle was approved by the City Council in June 2018.

Entergy Texas

After enactment of the Tax Act the PUCT issued an order requiring most utilities, including Entergy Texas, beginning January 25, 2018, to record a regulatory liability for the difference between revenues collected under existing rates and revenues that would have been collected had existing rates been set using the new federal income tax rates and also for the balance of excess accumulated deferred income taxes. Entergy Texas had previously provided information to the PUCT staff and stated that it expected the PUCT to address the lower tax expense as part of Entergy Texas’s rate case expected to be filed in May 2018.
In May 2018, Entergy Texas filed its 2018 base rate case with the PUCT. Entergy Texas’s proposed rates and revenues reflected the inclusion of the federal income tax reductions due to the Tax Act. The PUCT issued an order in December 2018 establishing that 1) $25 million be credited to customers through a rider to reflect the lower federal income tax rate applicable to Entergy Texas from January 2018 through the date new rates were implemented, 2) $242.5 million of protected excess accumulated deferred income taxes be returned to customers through base rates under the average rate assumption method over the lives of the associated assets, and 3) $185.2 million of unprotected excess accumulated deferred income taxes be returned to customers through a rider. The unprotected excess accumulated deferred income taxes rider includes carrying charges and is in effect over a period of 12 months for larger customers and over a period of four years for other customers.

System Energy

In a filing made with the FERC in March 2018, System Energy proposed revisions to the Unit Power Sales Agreement to reflect the effects of the Tax Act. In the filing System Energy proposed to return identified quantities of unprotected excess accumulated deferred income taxes to its customers by the end of 2018. In May 2018 the FERC accepted System Energy’s proposed tax revisions with an effective date of June 1, 2018, subject to refund and the outcome of settlement and hearing procedures. Settlement discussions were terminated in April 2019, and a hearing was held in March 2020. The retail regulators of the Utility operating companies that are parties to the Unit Power Sales Agreement challenged the treatment and amount of excess accumulated deferred income tax liabilities associated with uncertain tax positions related to nuclear decommissioning. In July 2020 the presiding ALJ in the proceeding issued an initial decision finding that there is an additional $147 million in unprotected excess accumulated deferred income taxes related to System Energy’s uncertain decommissioning tax deduction. The initial decision determined that System Energy should have included the $147 million in its March 2018 filing. System Energy had not included credits related to the effect of the Tax Act on the uncertain decommissioning tax position because it was uncertain whether the IRS would allow the deduction. The initial decision rejected both System Energy’s alternative argument that any crediting should occur over a ten-year period and the retail regulators’ argument that any crediting should occur over a two-year period. Instead, the initial decision concluded that System Energy should credit the additional unprotected excess accumulated deferred income taxes in a single lump sum revenue requirement reduction following a FERC order addressing the initial decision.

The ALJ initial decision is an interim step in the FERC litigation process. In September 2020, System Energy filed a brief on exceptions with the FERC, re-urging its positions and requesting the reversal of the ALJ’s initial decision. In December 2020, the LPSC, APSC, MPSC, City Council, and FERC trial staff filed briefs opposing exceptions. The FERC will review the case and issue an order in the proceeding, and the FERC may accept, reject, or modify the ALJ’s initial decision in whole or in part. Credits, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.

As discussed below in Grand Gulf Sale-leaseback Renewal Complaint and Uncertain Tax Position Rate Base Issue,” in September 2020 the IRS issued a Notice of Proposed Adjustment (NOPA) and Entergy executed it. In September 2020, System Energy filed a motion to lodge the NOPA into the record in the FERC proceeding. In October 2020 the LPSC, APSC, MPSC, City Council, and FERC trial staff filed oppositions to System Energy’s motion. As a result of the NOPA, System Energy filed, in October 2020, a new Federal Power Act section 205 filing at the FERC to credit the excess accumulated deferred income taxes resulting from the decommissioning uncertain tax position. System Energy proposes to credit the entire amount of the excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position by issuing a one-time credit of $17.8 million. In November 2020, the LPSC, APSC, MPSC, and City Council filed a protest to the filing, and System Energy responded.

In November 2020 the IRS issued the Revenue Agent’s Report (RAR) for the 2014-2015 tax years and in December 2020 Entergy executed it. In December 2020, System Energy filed a motion to lodge the RAR into the record in the FERC proceeding addressing the Tax Cuts and Jobs Act. In January 2021 the LPSC, APSC, MPSC,
and City Council filed a joint answer opposing System Energy’s motion, and the FERC trial staff also filed an answer opposing System Energy’s motion.

As a result of the RAR, in December 2020, System Energy also filed an amendment to its Federal Power Act section 205 filing to credit excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position. The amendment proposed the inclusion of the RAR as support for the filing. In December 2020, the LPSC, APSC, and City Council filed a protest in response to the amendment, reiterating objections to the filing to credit excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position. In February 2021 the FERC issued an order accepting System Energy’s Federal Power Act section 205 filing subject to refund, setting it for hearing, and holding the hearing in abeyance.

In November 2020, System Energy filed a motion to vacate the ALJ’s decision, arguing that it had been overtaken by changed circumstances because of the IRS’s determination resulting from the NOPA and RAR. In January 2021 the LPSC, APSC, MPSC, and City Council filed a joint answer opposing System Energy’s motion, and the FERC trial staff also filed an answer opposing System Energy’s motion. Additional responsive pleadings were filed in February and March 2021. There is no formal deadline for FERC to rule on the motion.

Fuel and purchased power cost recovery

The Utility operating companies are allowed to recover fuel and purchased power costs through fuel mechanisms included in electric and gas rates that are recorded as fuel cost recovery revenues.  The difference between revenues collected and the current fuel and purchased power costs is generally recorded as “Deferred fuel costs” on the Utility operating companies’ financial statements.  The table below shows the amount of deferred fuel costs as of December 31, 2021 and 2020 that Entergy expects to recover (or return to customers) through fuel mechanisms, subject to subsequent regulatory review.

 20212020
 (In Millions)
Entergy Arkansas (a)$177.6 $15.2 
Entergy Louisiana (b)$213.5 $170.4 
Entergy Mississippi$121.9 ($14.7)
Entergy New Orleans (b)($3.5)$6.2 
Entergy Texas$48.3 ($85.4)

(a)Includes $68.8 million in 2021 and $68.2 million in 2020 of fuel and purchased power costs whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.
(b)Includes $168.1 million in both years for Entergy Louisiana and $4.1 million in both years for Entergy New Orleans of fuel, purchased power, and capacity costs, which do not currently earn a return on investment and whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.

Entergy Arkansas

Energy Cost Recovery Rider

Entergy Arkansas’s retail rates include an energy cost recovery rider to recover fuel and purchased energy costs in monthly customer bills.  The rider utilizes the prior calendar-year energy costs and projected energy sales for the twelve-month period commencing on April 1 of each year to develop an energy cost rate, which is redetermined annually and includes a true-up adjustment reflecting the over- or under-recovery, including carrying
charges, of the energy costs for the prior calendar year.  The energy cost recovery rider tariff also allows an interim rate request depending upon the level of over- or under-recovery of fuel and purchased energy costs.

In January 2014, Entergy Arkansas filed a motion with the APSC relating to its upcoming energy cost rate redetermination filing that was made in March 2014. In that motion, Entergy Arkansas requested that the APSC authorize Entergy Arkansas to exclude from the redetermination of its 2014 energy cost rate $65.9 million of incremental fuel and replacement energy costs incurred in 2013 as a result of the ANO stator incident. Entergy Arkansas requested that the APSC authorize Entergy Arkansas to retain that amount in its deferred fuel balance, with recovery to be reviewed in a later period after more information was available regarding various claims associated with the ANO stator incident. In February 2014 the APSC approved Entergy Arkansas’s request to retain that amount in its deferred fuel balance. In July 2017, Entergy Arkansas filed for a change in rates pursuant to its formula rate plan rider. In that proceeding, the APSC approved a settlement agreement agreed upon by the parties, including a provision that requires Entergy Arkansas to initiate a regulatory proceeding for the purpose of recovering funds currently withheld from rates and related to the stator incident, including the $65.9 million of deferred fuel and purchased energy costs previously noted, subject to certain timelines and conditions set forth in the settlement agreement. In October 2021 the APSC approved Entergy Arkansas’s second request to extend the deadline for initiating a regulatory proceeding for the purpose of recovering funds related to the stator incident for twelve additional months, or until December 1, 2022. See the “ANO Damage, Outage, and NRC Reviews” section in Note 8 to the financial statements for further discussion of the ANO stator incident.

In March 2017, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01164 per kWh to $0.01547 per kWh. The APSC staff filed testimony in March 2017 recommending that the redetermined rate be implemented with the first billing cycle of April 2017 under the normal operation of the tariff. Accordingly, the redetermined rate went into effect on March 31, 2017 pursuant to the tariff. In July 2017 the Arkansas Attorney General requested additional information to support certain of the costs included in Entergy Arkansas’s 2017 energy cost rate redetermination.

In March 2018, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01547 per kWh to $0.01882 per kWh. The Arkansas Attorney General filed a response to Entergy Arkansas’s annual redetermination filing requesting that the APSC suspend the proposed tariff to investigate the amount of the redetermination or, alternatively, to allow recovery subject to refund. Among the reasons the Attorney General cited for suspension were questions pertaining to how Entergy Arkansas forecasted sales and potential implications of the Tax Cuts and Jobs Act. Entergy Arkansas replied to the Attorney General’s filing and stated that, to the extent there are questions pertaining to its load forecasting or the operation of the energy cost recovery rider, those issues exceed the scope of the instant rate redetermination. Entergy Arkansas also stated that potential effects of the Tax Cuts and Jobs Act are appropriately considered in the APSC’s separate proceeding regarding potential implications of the tax law. The APSC general staff filed a reply to the Attorney General’s filing and agreed that Entergy Arkansas’s filing complied with the terms of the energy cost recovery rider. The redetermined rate became effective with the first billing cycle of April 2018. Subsequently in April 2018 the APSC issued an order declining to suspend Entergy Arkansas’s energy cost recovery rider rate and declining to require further investigation at that time of the issues suggested by the Attorney General in the proceeding. Following a period of discovery, the Attorney General filed a supplemental response in October 2018 raising new issues with Entergy Arkansas’s March 2018 rate redetermination and asserting that $45.7 million of the increase should be collected subject to refund pending further investigation. Entergy Arkansas filed to dismiss the Attorney General’s supplemental response, the APSC general staff filed a motion to strike the Attorney General’s filing, and the Attorney General filed a supplemental response disputing Entergy Arkansas and the APSC staff’s filing. Applicable APSC rules and processes authorize its general staff to initiate periodic audits of Entergy Arkansas’s energy cost recovery rider. In late-2018 the APSC general staff notified Entergy Arkansas it has initiated an audit of the 2017 fuel costs. The time in which the audit will be complete is uncertain at this time.
In March 2019, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected a decrease from $0.01882 per kWh to $0.01462 per kWh and became effective with the first billing cycle in April 2019. In March 2019 the Arkansas Attorney General filed a response to Entergy Arkansas’s annual adjustment and included with its filing a motion for investigation of alleged overcharges to customers in connection with the FERC’s October 2018 order in the opportunity sales proceeding. Entergy Arkansas filed its response to the Attorney General’s motion in April 2019 in which Entergy Arkansas stated its intent to initiate a proceeding to address recovery issues related to the October 2018 FERC order. In May 2019, Entergy Arkansas initiated the opportunity sales recovery proceeding, discussed below, and requested that the APSC establish that proceeding as the single designated proceeding in which interested parties may assert claims related to the appropriate retail rate treatment of the FERC October 2018 order and related FERC orders in the opportunity sales proceeding. In June 2019 the APSC granted Entergy Arkansas’s request and also denied the Attorney General’s motion in the energy cost recovery proceeding seeking an investigation into Entergy Arkansas’s annual energy cost recovery rider adjustment and referred the evaluation of such matters to the opportunity sales recovery proceeding.

In March 2020, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected a decrease from $0.01462 per kWh to $0.01052 per kWh. The redetermined rate became effective with the first billing cycle in April 2020 through the normal operation of the tariff.

In March 2021, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected a decrease from $0.01052 per kWh to $0.00959 per kWh. The redetermined rate calculation also included an adjustment to account for a portion of the increased fuel costs resulting from the February 2021 winter storms. The redetermined rate became effective with the first billing cycle in April 2021 through the normal operation of the tariff.

Entergy Louisiana

Entergy Louisiana recovers electric fuel and purchased power costs for the billing month based upon the level of such costs incurred two months prior to the billing month. Entergy Louisiana’s purchased gas adjustments include estimates for the billing month adjusted by a surcharge or credit that arises from an annual reconciliation of fuel costs incurred with fuel cost revenues billed to customers, including carrying charges.

In July 2014 the LPSC authorized its staff to initiate an audit of the fuel adjustment clause filings by Entergy Gulf States Louisiana, whose business was combined with Entergy Louisiana in 2015. The audit includes a review of the reasonableness of charges flowed through Entergy Gulf States Louisiana’s fuel adjustment clause for the period from 2010 through 2013. In January 2019 the LPSC staff consultant issued its audit report. In its report, the LPSC staff consultant recommended that Entergy Louisiana refund approximately $900,000, plus interest, to customers based upon the imputation of a claim of vendor fault in servicing its nuclear plant. Entergy Louisiana recorded a provision in the first quarter 2019 for the potential outcome of the audit. In August 2019, Entergy Louisiana filed direct testimony challenging the basis for the LPSC staff’s recommended disallowance and providing an alternative calculation of replacement power costs should it be determined that a disallowance is appropriate. Entergy Louisiana’s calculation would require no refund to customers.

In July 2014 the LPSC authorized its staff to initiate an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed by Entergy Louisiana through its fuel adjustment clause for the period from 2010 through 2013. In January 2019 the LPSC staff issued its audit report recommending that Entergy Louisiana refund approximately $7.3 million, plus interest, to customers based upon the imputation of a claim of vendor fault in servicing its nuclear plant. Entergy Louisiana recorded a provision in the first quarter 2019 for the potential outcome of the audit. In August 2019, Entergy Louisiana filed direct testimony challenging the basis for the LPSC staff’s recommended disallowance and providing an alternative calculation of replacement power costs should it be determined that a disallowance is appropriate. Entergy Louisiana’s calculation
would require a refund to customers of approximately $4.3 million, plus interest, as compared to the LPSC staff’s recommendation of $7.3 million, plus interest. Responsive testimony was filed by the LPSC staff and intervenors in September 2019; all parties either agreed with or did not oppose Entergy Louisiana’s alternative calculation of replacement power costs.

In November 2019 the pending LPSC proceedings for the 2010-2013 Entergy Louisiana and Entergy Gulf States Louisiana audits were consolidated to facilitate a settlement of both fuel audits. In December 2019 an unopposed settlement was reached that requires a refund to legacy Entergy Louisiana customers of approximately $2.3 million, including interest, and no refund to legacy Entergy Gulf States Louisiana customers. The LPSC approved the settlement in January 2020. A one-time refund was made in February 2020.

In March 2020 the LPSC staff provided notice of an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s fuel adjustment clause for the period from 2016 through 2019. In September 2021 the LPSC submitted its audit report and found that all costs recovered through the fuel adjustment clause were reasonable and eligible for recovery through the fuel adjustment clause. Intervenors are conducting discovery regarding the LPSC staff’s report.

In February 2021, Entergy Louisiana incurred extraordinary fuel costs associated with the February 2021 winter storms. To mitigate the effect of these costs on customer bills, in March 2021 Entergy Louisiana requested and the LPSC approved the deferral and recovery of $166 million in incremental fuel costs over five months beginning in April 2021. The incremental fuel costs remain subject to review for reasonableness and eligibility for recovery through the fuel adjustment clause mechanism. The final amount of incremental fuel costs is subject to change through the resettlement process. At its April 2021 meeting, the LPSC authorized its staff to review the prudence of the February 2021 fuel costs incurred by all LPSC-jurisdictional utilities. At its June 2021 meeting, the LPSC approved the hiring of consultants to assist its staff in this review. Discovery is ongoing.

In March 2021 the LPSC staff provided notice of an audit of Entergy Louisiana’s purchased gas adjustment clause filings covering the period January 2018 through December 2020. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s purchased gas adjustment clause for that period. Discovery is ongoing, and no audit report has been filed.

Entergy Mississippi

Entergy Mississippi’s rate schedules include an energy cost recovery rider that is adjusted annually to reflect accumulated over- or under-recoveries.  Entergy Mississippi’s fuel cost recoveries are subject to annual audits conducted pursuant to the authority of the MPSC.

In November 2018, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an under-recovery of approximately $57 million as of September 30, 2018. In January 2019 the MPSC approved the proposed energy cost factor effective for February 2019 bills.

In November 2019, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation included $39.6 million of prior over-recovery flowing back to customers beginning February 2020. Entergy Mississippi’s balance in its deferred fuel account did not decrease as expected after implementation of the new factor. In an effort to assist customers during the COVID-19 pandemic, in May 2020, Entergy Mississippi requested an interim adjustment to the energy cost recovery rider to credit approximately $50 million from the over-recovered balance in the deferred fuel account to customers over four consecutive billing months. The MPSC approved this interim adjustment in May 2020 effective for June through September 2020 bills.
In November 2020, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an over-recovery of approximately $24.4 million as of September 30, 2020. In January 2021 the MPSC approved the proposed energy cost factor effective for February 2021 bills.

In November 2021, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an under-recovery of approximately $80.6 million as of September 30, 2021. In December 2021, at the request of the MPSC, Entergy Mississippi submitted a proposal to mitigate the impact of rising fuel costs on customer bills during 2022. Entergy Mississippi proposed that the deferred fuel balance as of December 31, 2021, which was $121.9 million, be amortized over three years, and that the MPSC authorize Entergy Mississippi to apply its weighted-average cost of capital as the carrying cost for the unamortized fuel balance. In January 2022 the MPSC approved the amortization of $100 million of the deferred fuel balance over two years and authorized Entergy Mississippi to apply its weighted-average cost of capital as the carrying cost for the unamortized fuel balance. The MPSC approved the proposed energy cost factor effective for February 2022 bills.

Entergy New Orleans

Entergy New Orleans’s electric rate schedules include a fuel adjustment tariff designed to reflect no more than targeted fuel and purchased power costs, adjusted by a surcharge or credit for deferred fuel expense arising from the monthly reconciliation of actual fuel and purchased power costs incurred with fuel cost revenues billed to customers, including carrying charges.

Entergy New Orleans’s gas rate schedules include a purchased gas adjustment to reflect estimated gas costs for the billing month, adjusted by a surcharge or credit similar to that included in the electric fuel adjustment clause, including carrying charges.

Entergy Texas

Entergy Texas’s rate schedules include a fixed fuel factor to recover fuel and purchased power costs, including interest, not recovered in base rates.  Semi-annual revisions of the fixed fuel factor are made in March and September based on the market price of natural gas and changes in fuel mix.  The amounts collected under Entergy Texas’s fixed fuel factor and any interim surcharge or refund are subject to fuel reconciliation proceedings before the PUCT. A fuel reconciliation is required to be filed at least once every three years and outside of a base rate case filing.

In September 2019, Entergy Texas filed an application to reconcile its fuel and purchased power costs for the period from April 2016 through March 2019. During the reconciliation period, Entergy Texas incurred approximately $1.6 billion in Texas jurisdictional eligible fuel and purchased power expenses, net of certain revenues credited to such expenses and other adjustments. Entergy Texas estimated an under-recovery balance of approximately $25.8 million, including interest, which Entergy Texas requested authority to carry over as the beginning balance for the subsequent reconciliation period beginning April 2019. In March 2020 an intervenor filed testimony proposing that the PUCT disallow: (1) $2 million in replacement power costs associated with generation outages during the reconciliation period; and (2) $24.4 million associated with the operation of the Spindletop natural gas storage facility during the reconciliation period.  In April 2020, Entergy Texas filed rebuttal testimony refuting all points raised by the intervenor.  In June 2020 the parties filed a stipulation and settlement agreement, which included a $1.2 million disallowance not associated with any particular issue raised by any party. The PUCT approved the settlement in August 2020.

In July 2020, Entergy Texas filed an application with the PUCT to implement an interim fuel refund of $25.5 million, including interest. Entergy Texas proposed that the interim fuel refund be implemented beginning with the first August 2020 billing cycle over a three-month period for smaller customers and in a lump sum amount
in the billing month of August 2020 for transmission-level customers. The interim fuel refund was approved in July 2020, and Entergy Texas began refunds in August 2020.

In February 2021, Entergy Texas filed an application to implement a fuel refund for a cumulative over-recovery of approximately $75 million that is primarily attributable to settlements received by Entergy Texas from MISO related to Hurricane Laura. Entergy Texas planned to issue the refund over the period of March through August 2021. On February 22, 2021, Entergy Texas filed a motion to abate its fuel refund proceeding to assess how the February 2021 winter storm impacted Entergy Texas’s fuel over-recovery position. In March 2021, Entergy Texas withdrew its application to implement the fuel refund. Entergy Texas is continuing to evaluate its fuel balance and will file a subsequent refund or surcharge application consistent with the requirements of the PUCT’s rules.
Entergy Arkansas Opportunity Sales Proceeding

In June 2009 the LPSC filed a complaint requesting that the FERC determine that certain of Entergy Arkansas’s sales of electric energy to third parties: (a) violated the provisions of the System Agreement that allocated the energy generated by Entergy System resources; (b) imprudently denied the Entergy System and its ultimate consumers the benefits of low-cost Entergy System generating capacity; and (c) violated the provision of the System Agreement that prohibited sales to third parties by individual companies absent an offer of a right-of-first-refusal to other Utility operating companies.  The LPSC’s complaint challenged sales made beginning in 2002 and requested refunds.  In July 2009 the Utility operating companies filed a response to the complaint arguing among other things that the System Agreement contemplates that the Utility operating companies may make sales to third parties for their own account, subject to the requirement that those sales be included in the load (or load shape) for the applicable Utility operating company.  The FERC subsequently ordered a hearing in the proceeding.

After a hearing, the ALJ issued an initial decision in December 2010.  The ALJ found that the System Agreement allowed for Entergy Arkansas to make the sales to third parties but concluded that the sales should be accounted for in the same manner as joint account sales.  The ALJ concluded that “shareholders” should make refunds of the damages to the Utility operating companies, along with interest.  Entergy disagreed with several aspects of the ALJ’s initial decision and in January 2011 filed with the FERC exceptions to the decision.
The FERC issued a decision in June 2012 and held that, while the System Agreement is ambiguous, it does provide authority for individual Utility operating companies to make opportunity sales for their own account and Entergy Arkansas made and priced these sales in good faith.  The FERC found, however, that the System Agreement does not provide authority for an individual Utility operating company to allocate the energy associated with such opportunity sales as part of its load but provides a different allocation authority.  The FERC further found that the after-the-fact accounting methodology used to allocate the energy used to supply the sales was inconsistent with the System Agreement.  The FERC in its decision established further hearing procedures to quantify the effect of repricing the opportunity sales in accordance with the FERC’s June 2012 decision. The hearing was held in May 2013 and the ALJ issued an initial decision in August 2013. The LPSC, the APSC, the City Council, and FERC staff filed briefs on exceptions and/or briefs opposing exceptions. Entergy filed a brief on exceptions requesting that the FERC reverse the initial decision and a brief opposing certain exceptions taken by the LPSC and FERC staff.

In April 2016 the FERC issued orders addressing requests for rehearing filed in July 2012 and the ALJ’s August 2013 initial decision. The first order denied Entergy’s request for rehearing and affirmed the FERC’s earlier rulings that Entergy’s original methodology for allocating energy costs to the opportunity sales was incorrect and, as a result, Entergy Arkansas must make payments to the other Utility operating companies to put them in the same position that they would have been in absent the incorrect allocation. The FERC clarified that interest should be included with the payments. The second order affirmed in part, and reversed in part, the rulings in the ALJ’s August 2013 initial decision regarding the methodology that should be used to calculate the payments Entergy Arkansas is to make to the other Utility operating companies. The FERC affirmed the ALJ’s ruling that a full re-run of intra-system bills should be performed but required that methodology be modified so that the sales have the same priority for purposes of energy allocation as joint account sales. The FERC reversed the ALJ’s decision that any payments by Entergy Arkansas should be reduced by 20%. The FERC also reversed the ALJ’s decision that adjustments to other System Agreement service schedules and excess bandwidth payments should not be taken into account when calculating the payments to be made by Entergy Arkansas. The FERC held that such adjustments and excess bandwidth payments should be taken into account but ordered further proceedings before an ALJ to address whether a cap on any reduction due to bandwidth payments was necessary and to implement the other adjustments to the calculation methodology.

In May 2016, Entergy Services filed a request for rehearing of the FERC’s April 2016 order arguing that payments made by Entergy Arkansas should be reduced as a result of the timing of the LPSC’s approval of certain contracts. Entergy Services also filed a request for clarification and/or rehearing of the FERC’s April 2016 order addressing the ALJ’s August 2013 initial decision. The APSC and the LPSC also filed requests for rehearing of the FERC’s April 2016 order. In September 2017 the FERC issued an order denying the request for rehearing on the issue of whether any payments by Entergy Arkansas to the other Utility operating companies should be reduced due to the timing of the LPSC’s approval of Entergy Arkansas’s wholesale baseload contract with Entergy Louisiana. In November 2017 the FERC issued an order denying all of the remaining requests for rehearing of the April 2016 order. In November 2017, Entergy Services filed a petition for review in the D.C. Circuit of the FERC’s orders in the first two phases of the opportunity sales case. In December 2017 the D.C. Circuit granted Entergy Services’ request to hold the appeal in abeyance pending final resolution of the related proceeding before the FERC. In January 2018 the APSC and the LPSC filed separate petitions for review in the D.C. Circuit, and the D.C. Circuit consolidated the appeals with Entergy Services’ appeal.

The hearing required by the FERC’s April 2016 order was held in May 2017. In July 2017 the ALJ issued an initial decision addressing whether a cap on any reduction due to bandwidth payments was necessary and whether to implement the other adjustments to the calculation methodology. In August 2017 the Utility operating companies, the LPSC, the APSC, and FERC staff filed individual briefs on exceptions challenging various aspects of the initial decision. In September 2017 the Utility operating companies, the LPSC, the APSC, the MPSC, the City Council, and FERC staff filed separate briefs opposing exceptions taken by various parties.
Based on testimony previously submitted in the case and its assessment of the April 2016 FERC orders, in the first quarter 2016, Entergy Arkansas recorded a liability of $87 million, which included interest, for its estimated increased costs and payment to the other Utility operating companies, and a deferred fuel regulatory asset of $75 million. Following its assessment of the course of the proceedings, including the FERC’s denial of rehearing in November 2017 described above, in the fourth quarter 2017, Entergy Arkansas recorded an additional liability of $35 million and a regulatory asset of $31 million.

In October 2018 the FERC issued an order addressing the ALJ’s July 2017 initial decision. The FERC reversed the ALJ’s decision to cap the reduction in Entergy Arkansas’s payment to account for the increased bandwidth payments that Entergy Arkansas made to the other operating companies. The FERC also reversed the ALJ’s decision that Grand Gulf sales from January through September 2000 should be included in the calculation of Entergy Arkansas’s payment. The FERC affirmed on other grounds the ALJ’s rejection of the LPSC’s claim that certain joint account sales should be accounted for as part of the calculation of Entergy Arkansas’s payment. In November 2018 the LPSC requested rehearing of the FERC’s October 2018 decision. In December 2019 the FERC denied the LPSC’s request for rehearing. In January 2020 the LPSC appealed the December 2019 decision to the D.C. Circuit.

In December 2018, Entergy made a compliance filing in response to the FERC’s October 2018 order. The compliance filing provided a final calculation of Entergy Arkansas’s payments to the other Utility operating companies, including interest. No protests were filed in response to the December 2018 compliance filing. The December 2018 compliance filing is pending FERC action. Refunds and interest in the following amounts were paid by Entergy Arkansas to the other operating companies in December 2018:

 Total refunds including interest
Payment/(Receipt)
 (In Millions)
PrincipalInterestTotal
Entergy Arkansas$68$67$135
Entergy Louisiana($30)($29)($59)
Entergy Mississippi($18)($18)($36)
Entergy New Orleans($3)($4)($7)
Entergy Texas($17)($16)($33)

Entergy Arkansas previously recognized a regulatory asset with a balance of $116 million as of December 31, 2018 for a portion of the payments due as a result of this proceeding.

As described above, the FERC’s opportunity sales orders have been appealed to the D.C. Circuit. In February 2020 all of the appeals were consolidated and in April 2020 the D.C. Circuit established a briefing schedule. Briefing was completed in September 2020 and oral argument was heard in December 2020. In July 2021 the D.C. Circuit issued a decision denying all of the petitions for review filed in response to the FERC’s opportunity sales orders.

In February 2019 the LPSC filed a new complaint relating to two issues that were raised in the opportunity sales proceeding, but that, in its October 2018 order, the FERC held were outside the scope of the proceeding. In March 2019, Entergy Services filed an answer and motion to dismiss the new complaint. In November 2019 the FERC issued an order denying the LPSC’s complaint. The order concluded that the settlement agreement approved by the FERC in December 2015 terminating the System Agreement barred the LPSC’s new complaint. In December 2019 the LPSC requested rehearing of the FERC’s November 2019 order, and in July 2020 the FERC issued an order dismissing the LPSC’s request for rehearing. In September 2020 the LPSC appealed to the D.C. Circuit the FERC’s orders dismissing the new opportunity sales complaint. In November 2020 the D.C. Circuit
issued an order establishing that briefing will occur in January 2021 through April 2021. Oral argument was held in September 2021. In December 2021 the D.C. Circuit denied the LPSC’s Petition for Review of the new opportunity sales complaint. The opportunity sales cases are complete at FERC and at the D.C. Circuit and no additional refund amounts are owed by Entergy Arkansas.

In May 2019, Entergy Arkansas filed an application and supporting testimony with the APSC requesting approval of a special rider tariff to recover the costs of these payments from its retail customers over a 24-month period.  The application requested that the APSC approve the rider to take effect within 30 days or, if suspended by the APSC as allowed by commission rule, approve the rider to take effect in the first billing cycle of the first month occurring 30 days after issuance of the APSC’s order approving the rider. In June 2019 the APSC suspended Entergy Arkansas’s tariff and granted Entergy Arkansas’s motion asking the APSC to establish the proceeding as the single designated proceeding in which interested parties may assert claims related to the appropriate retail rate treatment of the FERC’s October 2018 order and related FERC orders in the opportunity sales proceeding. In January 2020 the APSC adopted a procedural schedule with a hearing in April 2020. In January 2020 the Attorney General and Arkansas Electric Energy Consumers, Inc. filed a joint motion seeking to dismiss Entergy Arkansas’s application alleging that the APSC, in a prior proceeding, ruled on the issues addressed in the application and determined that Entergy Arkansas’s requested relief violates the filed rate doctrine and the prohibition against retroactive ratemaking. Entergy Arkansas responded to the joint motion in February 2020 rebutting these arguments, including demonstrating that the claims in this proceeding differ substantially from those the APSC addressed previously and that the payment resulting from a FERC tariff violation for which Entergy Arkansas seeks retail cost recovery in this proceeding differs materially from the refunds resulting from a FERC tariff amendment that the APSC previously rejected on filed rate doctrine and the retroactive ratemaking grounds. In addition, in January 2020 the Attorney General and Arkansas Electric Energy Consumers, Inc. filed testimony opposing the recovery by Entergy Arkansas of the opportunity sales payment but also claiming that certain components of the payment should be segregated and refunded to customers. In March 2020, Entergy Arkansas filed rebuttal testimony.

In July 2020 the APSC issued a decision finding that Entergy Arkansas’s application is not in the public interest. The order also directed Entergy Arkansas to refund to its retail customers within 30 days of the order the FERC-determined over-collection of $13.7 million, plus interest, associated with a recalculated bandwidth remedy. In addition to these primary findings, the order also denied the Attorney General’s request for Entergy Arkansas to prepare a compliance filing detailing all of the retail impacts from the opportunity sales and denied a request by the Arkansas Electric Energy Consumers to recalculate all costs using the revised responsibility ratio. Entergy Arkansas filed a motion for temporary stay of the 30-day requirement to allow Entergy Arkansas a reasonable opportunity to seek rehearing of the APSC order, but in July 2020 the APSC denied Entergy Arkansas’s request for a stay and directed Entergy Arkansas to refund to its retail customers the component of the total FERC-determined opportunity sales payment that was associated with increased bandwidth remedy payments of $13.7 million, plus interest. The refunds were issued in the August 2020 billing cycle. While the APSC denied Entergy Arkansas’s stay request, Entergy Arkansas believes its actions were prudent and, therefore, the costs, including the $13.7 million, plus interest, are recoverable. In July 2020, Entergy Arkansas requested rehearing of the APSC order, which rehearing was denied by the APSC in August 2020. In September 2020, Entergy Arkansas filed a complaint in the U.S. District Court for the Eastern District of Arkansas challenging the APSC’s order denying Entergy Arkansas’s request to recover the costs of these payments. In October 2020 the APSC filed a motion to dismiss Entergy Arkansas’s complaint, to which Entergy Arkansas responded. Also in December 2020, Entergy Arkansas and the APSC held a pre-trial conference, and filed a report with the court in January 2021. The court held a hearing in February 2021 regarding issues addressed in the pre-trial conference report, and in June 2021 the court stayed all discovery until it rules on pending motions, after which the court will issue an amended schedule if necessary.
Complaints Against System Energy

System Energy’s operating revenues are derived from the allocation of the capacity, energy, and related costs associated with its 90% ownership/leasehold interest in Grand Gulf.  System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans pursuant to the Unit Power Sales Agreement. System Energy and the Unit Power Sales Agreement are currently the subject of several litigation proceedings at the FERC, including challenges with respect to System Energy’s authorized return on equity and capital structure, renewal of its sale-leaseback arrangement, treatment of uncertain tax positions, a broader investigation of rates under the Unit Power Sales Agreement, and a prudence complaint challenging the extended power uprate completed at Grand Gulf in 2012 and the operation and management of Grand Gulf, particularly in the 2016-2020 time period. The claims in these proceedings include claims for refunds and claims for rate adjustments; the aggregate amount of refunds claimed in these proceedings substantially exceeds the net book value of System Energy. Following are discussions of the proceedings.

Return on Equity and Capital Structure Complaints

In January 2017 the APSC and MPSC filed a complaint with the FERC against System Energy. The complaint seeks a reduction in the return on equity component of the Unit Power Sales Agreement pursuant to which System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. Entergy Arkansas also sells some of its Grand Gulf capacity and energy to Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under separate agreements. The current return on equity under the Unit Power Sales Agreement is 10.94%, which was established in a rate proceeding that became final in July 2001.

The APSC and MPSC complaint alleges that the return on equity is unjust and unreasonable because capital market and other considerations indicate that it is excessive. The complaint requests proceedings to investigate the return on equity and establish a lower return on equity, and also requests that the FERC establish January 23, 2017 as a refund effective date. The complaint includes return on equity analysis that purports to establish that the range of reasonable return on equity for System Energy is between 8.37% and 8.67%. System Energy answered the complaint in February 2017 and disputes that a return on equity of 8.37% to 8.67% is just and reasonable. The LPSC and the City Council intervened in the proceeding expressing support for the complaint. In September 2017 the FERC established a refund effective date of January 23, 2017 and directed the parties to engage in settlement proceedings before an ALJ. The parties were unable to settle the return on equity issue and a FERC hearing judge was assigned in July 2018. The 15-month refund period in connection with the APSC/MPSC complaint expired on April 23, 2018.

In April 2018 the LPSC filed a complaint with the FERC against System Energy seeking an additional 15-month refund period.  The LPSC complaint requests similar relief from the FERC with respect to System Energy’s return on equity and also requests the FERC to investigate System Energy’s capital structure.  The APSC, MPSC, and City Council intervened in the proceeding, filed an answer expressing support for the complaint, and asked the FERC to consolidate this proceeding with the proceeding initiated by the complaint of the APSC and MPSC in January 2017. System Energy answered the LPSC complaint in May 2018 and also filed a motion to dismiss the complaint. In August 2018 the FERC issued an order dismissing the LPSC’s request to investigate System Energy’s capital structure and setting for hearing the return on equity complaint, with a refund effective date of April 27, 2018. The 15-month refund period in connection with the LPSC return on equity complaint expired on July 26, 2019.

The portion of the LPSC’s complaint dealing with return on equity was subsequently consolidated with the APSC and MPSC complaint for hearing. The parties addressed an order (issued in a separate FERC proceeding involving New England transmission owners) that proposed modifying the FERC’s standard methodology for determining return on equity. In September 2018, System Energy filed a request for rehearing and the LPSC filed a request for rehearing or reconsideration of the FERC’s August 2018 order. The LPSC’s request referenced an
amended complaint that it filed on the same day raising the same capital structure claim the FERC had earlier dismissed. The FERC initiated a new proceeding for the amended capital structure complaint, and System Energy submitted a response in October 2018. In January 2019 the FERC set the amended complaint for settlement and hearing proceedings. Settlement proceedings in the capital structure proceeding commenced in February 2019. As noted below, in June 2019 settlement discussions were terminated and the amended capital structure complaint was consolidated with the ongoing return on equity proceeding. The 15-month refund period in connection with the capital structure complaint was from September 24, 2018 to December 23, 2019.

In January 2019 the LPSC and the APSC and MPSC filed direct testimony in the return on equity proceeding. For the refund period January 23, 2017 through April 23, 2018, the LPSC argues for an authorized return on equity for System Energy of 7.81% and the APSC and MPSC argue for an authorized return on equity for System Energy of 8.24%. For the refund period April 27, 2018 through July 27, 2019, and for application on a prospective basis, the LPSC argues for an authorized return on equity for System Energy of 7.97% and the APSC and MPSC argue for an authorized return on equity for System Energy of 8.41%. In March 2019, System Energy submitted answering testimony. For the first refund period, System Energy’s testimony argues for a return on equity of 10.10% (median) or 10.70% (midpoint). For the second refund period, System Energy’s testimony shows that the calculated returns on equity for the first period fall within the range of presumptively just and reasonable returns on equity, and thus the second complaint should be dismissed (and the first period return on equity used going forward). If the FERC nonetheless were to set a new return on equity for the second period (and going forward), System Energy argues the return on equity should be either 10.32% (median) or 10.69% (midpoint).

In May 2019 the FERC trial staff filed its direct and answering testimony in the return on equity proceeding. For the first refund period, the FERC trial staff calculates an authorized return on equity for System Energy of 9.89% based on the application of FERC’s proposed methodology. The FERC trial staff’s direct and answering testimony noted that an authorized return on equity of 9.89% for the first refund period was within the range of presumptively just and reasonable returns on equity for the second refund period, as calculated using a study period ending January 31, 2019 for the second refund period.

In June 2019, System Energy filed testimony responding to the testimony filed by the FERC trial staff. Among other things, System Energy’s testimony rebutted arguments raised by the FERC trial staff and provided updated calculations for the second refund period based on the study period ending May 31, 2019. For that refund period, System Energy’s testimony shows that strict application of the return on equity methodology proposed by the FERC staff indicates that the second complaint would not be dismissed, and the new return on equity would be set at 9.65% (median) or 9.74% (midpoint). System Energy’s testimony argues that these results are insufficient in light of benchmarks such as state returns on equity and treasury bond yields, and instead proposes that the calculated returns on equity for the second period should be either 9.91% (median) or 10.3% (midpoint). System Energy’s testimony also argues that, under application of its proposed modified methodology, the 10.10% return on equity calculated for the first refund period would fall within the range of presumptively just and reasonable returns on equity for the second refund period.

Also in June 2019, the FERC’s Chief ALJ issued an order terminating settlement discussions in the amended complaint addressing System Energy’s capital structure. The ALJ consolidated the amended capital structure complaint with the ongoing return on equity proceeding and set new procedural deadlines for the consolidated hearing.

In August 2019 the LPSC and the APSC and MPSC filed rebuttal testimony in the return on equity proceeding and direct and answering testimony relating to System Energy’s capital structure. The LPSC re-argues for an authorized return on equity for System Energy of 7.81% for the first refund period and 7.97% for the second refund period. The APSC and MPSC argue for an authorized return on equity for System Energy of 8.26% for the first refund period and 8.32% for the second refund period. With respect to capital structure, the LPSC proposes that the FERC establish a hypothetical capital structure for System Energy for ratemaking purposes. Specifically, the LPSC proposes that System Energy’s common equity ratio be set to Entergy Corporation’s equity ratio of 37%
equity and 63% debt. In the alternative, the LPSC argues that the equity ratio should be no higher than 49%, the composite equity ratio of System Energy and the other Entergy operating companies who purchase under the Unit Power Sales Agreement. The APSC and MPSC recommend that 35.98% be set as the common equity ratio for System Energy. As an alternative, the APSC and MPSC propose that System Energy’s common equity be set at 46.75% based on the median equity ratio of the proxy group for setting the return on equity.

In September 2019 the FERC trial staff filed its rebuttal testimony in the return on equity proceeding. For the first refund period, the FERC trial staff calculates an authorized return on equity for System Energy of 9.40% based on the application of the FERC’s proposed methodology and an updated proxy group. For the second refund period, based on the study period ending May 31, 2019, the FERC trial staff rebuttal testimony argues for a return on equity of 9.63%. In September 2019 the FERC trial staff also filed direct and answering testimony relating to System Energy’s capital structure. The FERC trial staff argues that the average capital structure of the proxy group used to develop System Energy’s return on equity should be used to establish the capital structure. Using this approach, the FERC trial staff calculates the average capital structure for its proposed proxy group of 46.74% common equity, and 53.26% debt.

In October 2019, System Energy filed answering testimony disputing the FERC trial staff’s, the LPSC’s, and the APSC’s and MPSC’s arguments for the use of a hypothetical capital structure and arguing that the use of System Energy’s actual capital structure is just and reasonable.

In November 2019, in a proceeding that did not involve System Energy, the FERC issued an order addressing the methodology for determining the return on equity applicable to transmission owners in MISO. Thereafter, the procedural schedule in the System Energy proceeding was amended to allow the participants to file supplemental testimony addressing the order in the MISO transmission owner proceeding (Opinion No. 569).

In February 2020 the LPSC, the MPSC and APSC, and the FERC trial staff filed supplemental testimony addressing Opinion No. 569 and how it would affect the return on equity evaluation for the two complaint periods concerning System Energy. For the first refund period, based on their respective interpretations and applications of the Opinion No. 569 methodology, the LPSC argues for an authorized return on equity for System Energy of 8.44%; the MPSC and APSC argue for an authorized return on equity of 8.41%; and the FERC trial staff argues for an authorized return on equity of 9.22%. For the second refund period and on a prospective basis, based on their respective interpretations and applications of the Opinion No. 569 methodology, the LPSC argues for an authorized return on equity for System Energy of 7.89%; the MPSC and APSC argue that an authorized return on equity of 8.01% may be appropriate; and the FERC trial staff argues for an authorized return on equity of 8.66%.

In April 2020, System Energy filed supplemental answering testimony addressing Opinion No. 569. System Energy argues that the Opinion No. 569 methodology is conceptually and analytically defective for purposes of establishing just and reasonable authorized return on equity determinations and proposes an alternative approach. As its primary recommendation, System Energy continues to support the return on equity determinations in its March 2019 testimony for the first refund period and its June 2019 testimony for the second refund period. Under the Opinion No. 569 methodology, System Energy calculates a “presumptively just and reasonable range” for the authorized return on equity for the first refund period of 8.57% to 9.52%, and for the second refund period of 8.28% to 9.11%. System Energy argues that these ranges are not just and reasonable results. Under its proposed alternative methodology, System Energy calculates an authorized return on equity of 10.26% for the first refund period, which also falls within the presumptively just and reasonable range calculated for the second refund period and prospectively.

In May 2020 the FERC issued an order on rehearing of Opinion No. 569 (Opinion No. 569-A). In June 2020 the procedural schedule in the System Energy proceeding was further revised in order to allow parties to address the Opinion No. 569-A methodology. Pursuant to the revised schedule, in June 2020, the LPSC, MPSC and APSC, and the FERC trial staff filed supplemental testimony addressing Opinion No. 569-A and how it would affect the return on equity evaluation for the two complaint periods concerning System Energy. For the first refund
period, based on their respective interpretations and applications of the Opinion No. 569-A methodology, the LPSC argues for an authorized return on equity for System Energy of 7.97%; the MPSC and APSC argue for an authorized return on equity of 9.24%; and the FERC trial staff argues for an authorized return on equity of 9.49%. For the second refund period and on a prospective basis, based on their respective interpretations and applications of the Opinion No. 569-A methodology, the LPSC argues for an authorized return on equity for System Energy of 7.78%; the MPSC and APSC argue that an authorized return on equity of 9.15% may be appropriate if the second complaint is not dismissed; and the FERC trial staff argues for an authorized return on equity of 9.09% if the second complaint is not dismissed.

Pursuant to the revised procedural schedule, in July 2020, System Energy filed supplemental testimony addressing Opinion No. 569-A. System Energy argues that strict application of the Opinion No. 569-A methodology produces results inconsistent with investor requirements and does not provide a sound basis on which to evaluate System Energy’s authorized return on equity. As its primary recommendation, System Energy argues for the use of a methodology that incorporates four separate financial models, including the constant growth form of the discounted cash flow model and the empirical capital asset pricing model. Based on application of its recommended methodology, System Energy argues for an authorized return on equity of 10.12% for the first refund period, which also falls within the presumptively just and reasonable range calculated for the second refund period and prospectively. Under the Opinion No. 569-A methodology, System Energy calculates an authorized return on equity of 9.44% for the first refund period, which also falls within the presumptively just and reasonable range calculated for the second refund period and prospectively.

The parties and FERC trial staff filed final rounds of testimony in August 2020. The hearing before a FERC ALJ occurred in late-September through early-October 2020, post-hearing briefing took place in November and December 2020.

In March 2021 the FERC ALJ issued an initial decision. With regard to System Energy’s authorized return on equity, the ALJ determined that the existing return on equity of 10.94% is no longer just and reasonable, and that the replacement authorized return on equity, based on application of the Opinion No. 569-A methodology, should be 9.32%. The ALJ further determined that System Energy should pay refunds for a fifteen-month refund period (January 2017-April 2018) based on the difference between the current return on equity and the replacement authorized return on equity. The ALJ determined that the April 2018 complaint concerning the authorized return on equity should be dismissed, and that no refunds for a second fifteen-month refund period should be due. With regard to System Energy’s capital structure, the ALJ determined that System Energy’s actual equity ratio is excessive and that the just and reasonable equity ratio is 48.15% equity, based on the average equity ratio of the proxy group used to evaluate the return on equity for the second complaint. The ALJ further determined that System Energy should pay refunds for a fifteen-month refund period (September 2018-December 2019) based on the difference between the actual equity ratio and the 48.15% equity ratio. If the ALJ’s initial decision is upheld, the estimated refund for this proceeding is approximately $60 million, which includes interest through December 31, 2021, and the estimated resulting annual rate reduction would be approximately $45 million. The estimated refund will continue to accrue interest until a final FERC decision is issued. Based on the course of the proceeding to date, System Energy has recorded a provision of $37 million, including interest, as of December 31, 2021.

The ALJ initial decision is an interim step in the FERC litigation process, and an ALJ’s determinations made in an initial decision are not controlling on the FERC. In April 2021, System Energy filed its brief on exceptions, in which it challenged the initial decision’s findings on both the return on equity and capital structure issues. Also in April 2021 the LPSC, APSC, MPSC, City Council, and the FERC trial staff filed briefs on exceptions. Reply briefs opposing exceptions were filed in May 2021 by System Energy, the FERC trial staff, the LPSC, APSC, MPSC, and the City Council. Refunds, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.
Grand Gulf Sale-leaseback Renewal Complaint and Uncertain Tax Position Rate Base Issue

In May 2018 the LPSC filed a complaint against System Energy and Entergy Services related to System Energy’s renewal of a sale-leaseback transaction originally entered into in December 1988 for an 11.5% undivided interest in Grand Gulf Unit 1. The complaint alleges that System Energy violated the filed rate and the FERC’s ratemaking and accounting requirements when it included in Unit Power Sales Agreement billings the cost of capital additions associated with the sale-leaseback interest, and that System Energy is double-recovering costs by including both the lease payments and the capital additions in Unit Power Sales Agreement billings. The complaint also claims that System Energy was imprudent in entering into the sale-leaseback renewal because the Utility operating companies that purchase Grand Gulf’s output from System Energy could have obtained cheaper capacity and energy in the MISO markets. The complaint further alleges that System Energy violated various other reporting and accounting requirements and should have sought prior FERC approval of the lease renewal. The complaint seeks various forms of relief from the FERC. The complaint seeks refunds for capital addition costs for all years in which they were recorded in allegedly non-formula accounts or, alternatively, the disallowance of the return on equity for the capital additions in those years plus interest. The complaint also asks that the FERC disallow and refund the lease costs of the sale-leaseback renewal on grounds of imprudence, investigate System Energy’s treatment of a DOE litigation payment, and impose certain forward-looking procedural protections, including audit rights for retail regulators of the Unit Power Sales Agreement formula rates. The APSC, MPSC, and City Council intervened in the proceeding.

In June 2018, System Energy and Entergy Services filed a motion to dismiss and an answer to the LPSC complaint denying that System Energy’s treatment of the sale-leaseback renewal and capital additions violated the terms of the filed rate or any other FERC ratemaking, accounting, or legal requirements or otherwise constituted double recovery. The response also argued that the complaint is inconsistent with a FERC-approved settlement to which the LPSC is a party and that explicitly authorizes System Energy to recover its lease payments. Finally, the response argued that both the capital additions and the sale-leaseback renewal were prudent investments and the LPSC complaint fails to justify any disallowance or refunds. The response also offered to submit formula rate protocols for the Unit Power Sales Agreement similar to the procedures used for reviewing transmission rates under the MISO tariff. In September 2018 the FERC issued an order setting the complaint for hearing and settlement proceedings. The FERC established a refund effective date of May 18, 2018.

In February 2019 the presiding ALJ ruled that the hearing ordered by the FERC includes the issue of whether specific subcategories of accumulated deferred income tax should be included in, or excluded from, System Energy’s formula rate. In March 2019 the LPSC, MPSC, APSC and City Council filed direct testimony. The LPSC testimony sought refunds that include the renewal lease payments (approximately $17.2 million per year since July 2015), rate base reductions for accumulated deferred income tax associated with uncertain tax positions, and the cost of capital additions associated with the sale-leaseback interest, as well as interest on those amounts.

In June 2019 System Energy filed answering testimony arguing that the FERC should reject all claims for refunds.  Among other things, System Energy argued that claims for refunds of the costs of lease renewal payments and capital additions should be rejected because those costs were recovered consistent with the Unit Power Sales Agreement formula rate, System Energy was not over or double recovering any costs, and ratepayers will save costs over the initial and renewal terms of the leases.  System Energy argued that claims for refunds associated with liabilities arising from uncertain tax positions should be rejected because the liabilities do not provide cost-free capital, the repayment timing of the liabilities is uncertain, and the outcome of the underlying tax positions is uncertain.  System Energy’s testimony also challenged the refund calculations supplied by the other parties.

In August 2019 the FERC trial staff filed direct and answering testimony seeking refunds for rate base reductions for liabilities associated with uncertain tax positions. The FERC trial staff also argued that System Energy recovered $32 million more than it should have in depreciation expense for capital additions. In September 2019, System Energy filed cross-answering testimony disputing the FERC trial staff’s arguments for refunds, stating that the FERC trial staff’s position regarding depreciation rates for capital additions is not unreasonable, but
explaining that any change in depreciation expense is only one element of a Unit Power Sales Agreement re-billing calculation. Adjustments to depreciation expense in any re-billing under the Unit Power Sales Agreement formula rate will also involve changes to accumulated depreciation, accumulated deferred income taxes, and other formula elements as needed. In October 2019 the LPSC filed rebuttal testimony increasing the amount of refunds sought for liabilities associated with uncertain tax positions.  The LPSC seeks approximately $512 million plus interest, which is approximately $216 million through December 31, 2021.  The FERC trial staff also filed rebuttal testimony in which it seeks refunds of a similar amount as the LPSC for the liabilities associated with uncertain tax positions.  The LPSC testimony also argued that adjustments to depreciation rates should affect rate base on a prospective basis only.

A hearing was held before a FERC ALJ in November 2019. In April 2020 the ALJ issued the initial decision. Among other things, the ALJ determined that refunds were due on three main issues. First, with regard to the lease renewal payments, the ALJ determined that System Energy is recovering an unjust acquisition premium through the lease renewal payments, and that System Energy’s recovery from customers through rates should be limited to the cost of service based on the remaining net book value of the leased assets, which is approximately $70 million. The ALJ found that the remedy for this issue should be the refund of lease payments (approximately $17.2 million per year since July 2015) with interest determined at the FERC quarterly interest rate, which would be offset by the addition of the net book value of the leased assets in the cost of service. The ALJ did not calculate a value for the refund expected as a result of this remedy. In addition, System Energy would no longer recover the lease payments in rates prospectively. Second, with regard to the liabilities associated with uncertain tax positions, the ALJ determined that the liabilities are accumulated deferred income taxes and that System Energy’s rate base should have been reduced for those liabilities. If the ALJ’s initial decision is upheld, the estimated refund for this issue through December 31, 2021, is approximately $422 million, plus interest, which is approximately $128 million through December 31, 2021. The ALJ also found that System Energy should include liabilities associated with uncertain tax positions as a rate base reduction going forward. Third, with regard to the depreciation expense adjustments, the ALJ found that System Energy should correct for the error in re-billings retroactively and prospectively, but that System Energy should not be permitted to recover interest on any retroactive return on enhanced rate base resulting from such corrections. If the initial decision is affirmed on this issue, System Energy estimates refunds of approximately $19 million, which includes interest through December 31, 2021.

The ALJ initial decision is an interim step in the FERC litigation process, and an ALJ’s determinations made in an initial decision are not controlling on the FERC. The ALJ in the initial decision acknowledges that these are issues of first impression before the FERC. In June 2020, System Energy, the LPSC, and the FERC trial staff filed briefs on exceptions, challenging several of the initial decision’s findings. System Energy’s brief on exceptions challenged the initial decision’s limitations on recovery of the lease renewal payments, its proposed rate base refund for the liabilities associated with uncertain tax positions, and its proposal to asymmetrically treat interest on bill corrections for depreciation expense adjustments. The LPSC’s and the FERC trial staff’s briefs on exceptions each challenged the initial decision’s allowance for recovery of the cost of service associated with the lease renewal based on the remaining net book value of the leased assets, its calculation of the remaining net book value of the leased assets, and the amount of the initial decision’s proposed rate base refund for the liabilities associated with uncertain tax positions. The LPSC’s brief on exceptions also challenged the initial decision’s proposal that depreciation expense adjustments include retroactive adjustments to rate base and its finding that section 203 of the Federal Power Act did not apply to the lease renewal. The FERC trial staff’s brief on exceptions also challenged the initial decision’s finding that the FERC need not institute a formal investigation into System Energy’s tariff. In October 2020, System Energy, the LPSC, the MPSC, the APSC, and the City Council filed briefs opposing exceptions. System Energy opposed the exceptions filed by the LPSC and the FERC trial staff. The LPSC, MPSC, APSC, City Council, and the FERC trial staff opposed the exceptions filed by System Energy. Also in October 2020 the MPSC, APSC, and the City Council filed briefs adopting the exceptions of the LPSC and the FERC trial staff. The case is pending before the FERC, which will review the case and issue an order on the proceeding, and the FERC may accept, reject, or modify the ALJ’s initial decision in whole or in part. Refunds, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.
In addition, in September 2020, the IRS issued a Notice of Proposed Adjustment (NOPA) and Entergy executed it. The NOPA memorializes the IRS’s decision to adjust the 2015 consolidated federal income tax return of Entergy Corporation and certain of its subsidiaries, including System Energy, with regard to the uncertain decommissioning tax position. Pursuant to the audit resolution documented in the NOPA, the IRS allowed System Energy’s inclusion of $102 million of future nuclear decommissioning costs in System Energy’s cost of goods sold for the 2015 tax year, roughly 10% of the requested deduction, but disallowed the balance of the position. In September 2020, System Energy filed a motion to lodge the NOPA into the record in the FERC proceeding. In October 2020 the LPSC, the APSC, the MPSC, the City Council, and the FERC trial staff filed oppositions to System Energy’s motion. As a result of the NOPA issued by the IRS in September 2020, System Energy filed, in October 2020, a new Federal Power Act section 205 filing at FERC to establish an ongoing rate base credit for the accumulated deferred income taxes resulting from the decommissioning uncertain tax position. On a prospective basis beginning with the October 2020 bill, System Energy proposes to include the accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position as a credit to rate base under the Unit Power Sales Agreement. In November 2020 the LPSC, APSC, MPSC, and City Council filed a protest to the filing, and System Energy responded.

In November 2020 the IRS issued a Revenue Agent’s Report (RAR) for the 2014/2015 tax year and in December 2020 Entergy executed it. The RAR contained the same adjustment to the uncertain nuclear decommissioning tax position as that which the IRS had announced in the NOPA. In December 2020, System Energy filed a motion to lodge the RAR into the record in the FERC proceeding addressing the uncertain tax position rate base issue. In January 2021 the LPSC, APSC, MPSC, and City Council filed a protest to the motion.

As a result of the RAR, in December 2020, System Energy filed amendments to its new Federal Power Act section 205 filings to establish an ongoing rate base credit for the accumulated deferred income taxes resulting from the decommissioning uncertain tax position and to credit excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position. The amendments both propose the inclusion of the RAR as support for the filings. In December 2020 the LPSC, APSC, and City Council filed a protest in response to the amendments, reiterating their prior objections to the filings. In February 2021 the FERC issued an order accepting System Energy’s Federal Power Act section 205 filings subject to refund, setting them for hearing, and holding the hearing in abeyance.

In December 2020, System Energy filed a new Federal Power Act section 205 filing to provide a one-time, historical credit of $25.2 million for the accumulated deferred income taxes that would have been created by the decommissioning uncertain tax position if the IRS’s decision had been known in 2016. In January 2021 the LPSC, APSC, MPSC, and City Council filed a protest to the filing. In February 2021 the FERC issued an order accepting System Energy’s Federal Power Act section 205 filing subject to refund, setting it for hearing, and holding the hearing in abeyance. The one-time credit was made during the first quarter 2021.

LPSC Authorization of Additional Complaints

In May 2020 the LPSC authorized its staff to file additional complaints at the FERC related to the rates charged by System Energy for Grand Gulf energy and capacity supplied to Entergy Louisiana under the Unit Power Sales Agreement. The LPSC directive notes that the initial decision issued by the presiding ALJ in the Grand Gulf sale-leaseback complaint proceeding did not address, for procedural reasons, certain rate issues raised by the LPSC and declined to order further investigation of rates charged by System Energy. The LPSC directive authorizes its staff to file complaints at the FERC “necessary to address these rate issues, to request a full investigation into the rates charged by System Energy for Grand Gulf power, and to seek rate refund, rate reduction, and such other remedies as may be necessary and appropriate to protect Louisiana ratepayers.” The LPSC directive further stated that the LPSC has seen “information suggesting that the Grand Gulf plant has been significantly underperforming compared to other nuclear plants in the United States, has had several extended and unexplained outages, and has been plagued with serious safety concerns.” The LPSC expressed concern that the costs paid by Entergy
Louisiana's retail customers may have been detrimentally impacted, and authorized “the filing of a FERC complaint to address these performance issues and to seek appropriate refund, rate reduction, and other remedies as may be appropriate.”

Unit Power Sales Agreement Complaint

The first of the additional complaints was filed by the LPSC, the APSC, the MPSC, and the City Council in September 2020. The complaint raises two sets of rate allegations: violations of the filed rate and a corresponding request for refunds for prior periods; and elements of the Unit Power Sales Agreement are unjust and unreasonable and a corresponding request for refunds for the 15-month refund period and changes to the Unit Power Sales Agreement prospectively. Several of the filed rate allegations overlap with the previous complaints. The filed rate allegations not previously raised are that System Energy: failed to provide a rate base credit to customers for the “time value” of sale-leaseback lease payments collected from customers in advance of the time those payments were due to the owner-lessors; improperly included certain lease refinancing costs in rate base as prepayments; improperly included nuclear decommissioning outage costs in rate base; failed to include categories of accumulated deferred income taxes as a reduction to rate base; charged customers based on a higher equity ratio than would be appropriate due to excessive retained earnings; and did not correctly reflect money pool investments and imprudently invested cash into the money pool. The elements of the Unit Power Sales Agreement that the complaint alleges are unjust and unreasonable include: incentive and executive compensation, lack of an equity re-opener, lobbying, and private airplane travel. The complaint also requests a rate investigation into the Unit Power Sales Agreement and System Energy’s billing practices pursuant to section 206 of the Federal Power Act, including any issue relevant to the Unit Power Sales Agreement and its inputs. System Energy filed its answer opposing the complaint in November 2020. In its answer, System Energy argued that all of the claims raised in the complaint should be dismissed and agreed that bill adjustment with respect to two discrete issues were justified. System Energy argued that dismissal is warranted because all claims fall into one or more of the following categories: the claims have been raised and are being litigated in another proceeding; the claims do not present a prima facie case and do not satisfy the threshold burden to establish a complaint proceeding; the claims are premised on a theory or request relief that is incompatible with federal law or FERC policy; the claims request relief that is inconsistent with the filed rate; the claims are barred or waived by the legal doctrine of laches; and/or the claims have been fully addressed and do not warrant further litigation. In December 2020, System Energy filed a bill adjustment report indicating that $3.4 million had been credited to customers in connection with the two discrete issues concerning the inclusion of certain accumulated deferred income taxes balances in rates. In January 2021 the complainants filed a response to System Energy’s November 2020 answer, and in February 2021, System Energy filed a response to the complainant’s response.

In May 2021 the FERC issued an order addressing the complaint, establishing a refund effective date of September 21, 2020, establishing hearing procedures, and holding those procedures in abeyance pending FERC’s review of the initial decision in the Grand Gulf sale-leaseback renewal complaint discussed above. System Energy agreed that the hearing should be held in abeyance but sought rehearing of FERC’s decision as related to matters set for hearing that were beyond the scope of FERC’s jurisdiction or authority. The complainants sought rehearing of FERC’s decision to hold the hearing in abeyance and filed a motion to proceed, which motion System Energy subsequently opposed. In June 2021, System Energy’s request for rehearing was denied by operation of law, and System Energy filed an appeal of FERC’s orders in the Court of Appeals for the Fifth Circuit. The appeal was initially stayed for a period of 90 days, but the stay expired. In November 2021 the Fifth Circuit dismissed the appeal as premature.

In August 2021 the FERC issued an order addressing System Energy’s and the complainants’ rehearing requests. The FERC dismissed part of the complaint seeking an equity re-opener, maintained the abeyance for issues related to the proceeding addressing the sale-leaseback renewal and uncertain tax positions, lifted the abeyance for issues unrelated to that proceeding, and clarified the scope of the hearing. A procedural schedule was established, with the hearing scheduled for June 2022 and the ALJ’s initial decision scheduled for November 2022. Discovery is ongoing.
In November 2021 the LPSC, APSC, and City Council filed direct testimony and requested the FERC to order refunds for prior periods and prospective amendments to the Unit Power Sales Agreement. The LPSC’s refund claims include, among other things, allegations that: (1) System Energy should not have included certain sale-leaseback transaction costs in prepayments; (2) System Energy should have credited rate base to reflect the time value of money associated with the advance collection of lease payments; (3) System Energy incorrectly included refueling outage costs that were recorded in account 174 in rate base; and (4) System Energy should have excluded several accumulated deferred income tax balances in account 190 from rate base. The LPSC is also seeking a retroactive adjustment to retained earnings and capital structure in conjunction with the implementation of its proposed refunds. In addition, the LPSC seeks amendments to the Unit Power Sales Agreement going forward to address below-the-line costs, incentive compensation, the working capital allowance, litigation expenses, and the 2019 termination of the capital funds agreement. The APSC argues that: (1) System Energy should have included borrowings from the Entergy System money pool in its determination of short-term debt in its cost of capital; and (2) System Energy should credit customers with System Energy’s allocation of earnings on money pool investments. The City Council alleges that System Energy has maintained excess cash on hand in the money pool and that retention of excess cash was imprudent. Based on this allegation, the City Council’s witness recommends a refund of approximately $98.8 million for the period 2004-September 2021 or other alternative relief. The City Council further recommends that the FERC impose a hypothetical equity ratio such as 48.15% equity to capital on a prospective basis.

In January 2022, System Energy filed answering testimony arguing that the FERC should not order refunds for prior periods or any prospective amendments to the Unit Power Sales Agreement. In response to the LPSC’s refund claims, System Energy argues, among other things, that (1) the inclusion of sale-leaseback transaction costs in prepayments was correct; (2) that the filed rate doctrine bars the request for a retroactive credit to rate base for the time value of money associated with the advance collection of lease payments; (3) that an accounting misclassification for deferred refueling outage costs has been corrected, caused no harm to customers, and requires no refunds; and (4) that its accounting and ratemaking treatment of specified accumulated deferred income tax balances in account 190 has been correct. System Energy further responds that no retroactive adjustment to retained earnings or capital structure should be ordered because there is no general policy requiring such a remedy and there was no showing that the retained earnings element of the capital structure was incorrectly implemented. Further, System Energy presented evidence that all of the costs that are being challenged were long known to the retail regulators and were approved by them for inclusion in retail rates, and the attempt to retroactively challenge these costs, some of which have been included in rates for decades, is unjust and unreasonable. In response to the LPSC’s proposed going-forward adjustments, System Energy presents evidence to show that none of the proposed adjustments are needed. On the issue of below-the-line expenses, during discovery procedures System Energy identified a historical allocation error in certain months and agreed to provide a bill credit to customers to correct the error. In response to the APSC’s claims, System Energy argues that the Unit Power Sales Agreement does not include System Energy’s borrowings from the Entergy System money pool or earnings on deposits to the Entergy System money pool in the determination of the cost of capital; and accordingly, no refunds are appropriate on those issues. In response to the City Council’s claims, System Energy argues that it has reasonably managed its cash and that the City Council’s theory of cash management is defective because it fails to adequately consider the relevant cash needs of System Energy and it makes faulty presumptions about the operation of the Entergy System money pool. System Energy further points out that the issue of its capital structure is already subject to pending FERC litigation.

Grand Gulf Prudence Complaint

The second of the additional complaints was filed at the FERC in March 2021 by the LPSC, the APSC, and the City Council against System Energy, Entergy Services, Entergy Operations, and Entergy Corporation. The second complaint contains two primary allegations. First, it alleges that, based on the plant’s capacity factor and alleged safety performance, System Energy and the other respondents imprudently operated Grand Gulf during the period 2016-2020, and it seeks refunds of at least $360 million in alleged replacement energy costs, in addition to other costs, including those that can only be identified upon further investigation. Second, it alleges that the
performance and/or management of the 2012 extended power uprate of Grand Gulf was imprudent, and it seeks refunds of all costs of the 2012 uprate that are determined to result from imprudent planning or management of the project. In addition to the requested refunds, the complaint asks that the FERC modify the Unit Power Sales Agreement to provide for full cost recovery only if certain performance indicators are met and to require pre-authorization of capital improvement projects in excess of $125 million before related costs may be passed through to customers in rates. In April 2021, System Energy and the other respondents filed their motion to dismiss and answer to the complaint. System Energy requested that the FERC dismiss the claims within the complaint. With respect to the claim concerning operations, System Energy argues that the complaint does not meet its legal burden because, among other reasons, it fails to allege any specific imprudent conduct. With respect to the claim concerning the uprate, System Energy argues that the complaint fails because, among other reasons, the complainants’ own conduct prevents them from raising a serious doubt as to the prudence of the uprate. System Energy also requests that the FERC dismiss other elements of the complaint, including the proposed modifications to the Unit Power Sales Agreement, because they are not warranted. Additional responsive pleadings were filed by the complainants and System Energy during the period from March through July 2021. The pleadings are pending FERC action.
Storm Cost Recovery Filings with Retail Regulators

Entergy Louisiana

Hurricane Laura, Hurricane Delta, Hurricane Zeta, Winter Storm Uri, and Hurricane Ida

In August 2020 and October 2020, Hurricane Laura, Hurricane Delta, and Hurricane Zeta caused significant damage to portions of Entergy Louisiana’s service area. The storms resulted in widespread outages, significant damage to distribution and transmission infrastructure, and the loss of sales during the outages. Additionally, as a result of Hurricane Laura’s extensive damage to the grid infrastructure serving the impacted area, large portions of the underlying transmission system required nearly a complete rebuild.

In October 2020, Entergy Louisiana filed an application at the LPSC seeking approval of certain ratemaking adjustments in connection with the issuance of shorter-term mortgage bonds to provide interim financing for restoration costs associated with Hurricane Laura, Hurricane Delta, and Hurricane Zeta. Subsequently, Entergy Louisiana and the LPSC staff filed a joint motion seeking approval to exclude from the derivation of Entergy Louisiana’s capital structure and cost rate of debt for ratemaking purposes, including the allowance for funds used during construction, shorter-term debt up to $1.1 billion issued by Entergy Louisiana to fund costs associated with Hurricane Laura, Hurricane Delta, and Hurricane Zeta costs on an interim basis. In November 2020 the LPSC issued an order approving the joint motion, and Entergy Louisiana issued $1.1 billion of 0.62% Series mortgage bonds due November 2023. Also in November 2020, Entergy Louisiana withdrew $257 million from its funded storm reserves.

In February 2021 two winter storms (collectively, Winter Storm Uri) brought freezing rain and ice to Louisiana. Ice accumulation sagged or downed trees, limbs and power lines, causing damage to Entergy Louisiana’s transmission and distribution systems. The additional weight of ice caused trees and limbs to fall into power lines and other electric equipment. When the ice melted, it affected vegetation and electrical equipment, causing additional outages. As discussed above in “Fuel and purchased power recovery,” Entergy Louisiana recovered the incremental fuel costs associated with Winter Storm Uri over a five-month period from April 2021 through August 2021.

In April 2021, Entergy Louisiana filed an application with the LPSC relating to Hurricane Laura, Hurricane Delta, Hurricane Zeta, and Winter Storm Uri restoration costs and in July 2021, Entergy Louisiana made a supplemental filing updating the total restoration costs. Total restoration costs for the repair and/or replacement of Entergy Louisiana’s electric facilities damaged by these storms are currently estimated to be approximately $2.06 billion, including approximately $1.68 billion in capital costs and approximately $380 million in non-capital
costs. Including carrying costs through January 2022, Entergy Louisiana is seeking an LPSC determination that $2.11 billion was prudently incurred and, therefore, is eligible for recovery from customers. Additionally, Entergy Louisiana is requesting that the LPSC determine that re-establishment of a storm escrow account to the previously authorized amount of $290 million is appropriate. In July 2021, Entergy Louisiana supplemented the application with a request regarding the financing and recovery of the recoverable storm restoration costs. Specifically, Entergy Louisiana requested approval to securitize its restoration costs pursuant to Louisiana Act 55 financing, as supplemented by Act 293 of the Louisiana Legislature’s Regular Session of 2021. As previously discussed, in August 2021, Hurricane Ida caused extensive damage to Entergy Louisiana’s distribution and, to a lesser extent, transmission systems resulting in widespread power outages. In September 2021, Entergy Louisiana supplemented the application with a request to establish and securitize a $1 billion restricted storm escrow account for Hurricane Ida related restoration costs, subject to a subsequent prudence review. In total, Entergy Louisiana requested authorization for the issuance of system restoration bonds in one or more series in an aggregate principal amount of $3.18 billion, which includes the costs of re-establishing and funding a storm damage escrow account, carrying costs and unamortized debt costs on interim financing, and issuance costs. After filing of testimony by LPSC staff and intervenors, which generally supported or did not oppose Entergy Louisiana’s requests, the parties negotiated and executed an uncontested stipulated settlement which was filed with the LPSC in February 2022. The settlement agreement contains the following key terms: $2.1 billion of restoration costs from Hurricane Laura, Hurricane Delta, Hurricane Zeta, and Winter Storm Uri were prudently incurred and are eligible for recovery; carrying costs of $51 million are recoverable; a $290 million cash storm reserve should be re-established; a $1 billion reserve should be established to partially pay for Hurricane Ida restoration costs; and Entergy Louisiana is authorized to finance $3.186 billion utilizing the securitization process authorized by Act 55, as supplemented by Act 293. The LPSC voted to approve the settlement at its February 2022 meeting.

Hurricane Isaac

In August 2012, Hurricane Isaac caused extensive damage to Entergy Louisiana’s service area.  In June 2014 the LPSC authorized Entergy Louisiana to utilize Louisiana Act 55 financing for Hurricane Isaac system restoration costs.  Entergy Louisiana committed to pass on to customers a minimum of $30.8 million of customer benefits through annual customer credits of approximately $6.2 million for five years. Approvals for the Act 55 financings were obtained from the Louisiana Utilities Restoration Corporation (LURC) and the Louisiana State Bond Commission.

In August 2014 the Louisiana Local Government Environmental Facilities and Community Development Authority (LCDA) issued $314.85 million in bonds under Louisiana Act 55.  From the $309 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $16 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $293 million directly to Entergy Louisiana.  Entergy Louisiana used the $293 million received from the LURC to acquire 2,935,152.69 Class C preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 7.5% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2014, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement. The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1.75 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

In the first quarter 2020, Entergy and the IRS agreed upon and settled on the treatment of funds received by Entergy Louisiana in conjunction with the Act 55 financing of Hurricane Isaac storm costs, which resulted in a net reduction of income tax expense of approximately $32 million. As a result of the settlement, the position was
partially sustained and Entergy Louisiana recorded a reduction of income tax expense of approximately $58 million primarily due to the reversal of liabilities for uncertain tax positions in excess of the agreed-upon settlement. Entergy recorded an increase to income tax expense of $26 million primarily resulting from the reduction of the deferred tax asset, associated with utilization of the net operating loss as a result of the settlement. This adjustment recorded by Entergy also accounted for the tax rate change of the Tax Cuts and Jobs Act. As a result of the IRS settlement, Entergy Louisiana recorded a $29 million ($21 million net-of-tax) regulatory charge and a corresponding regulatory liability to reflect its obligation to customers pursuant to the LPSC Hurricane Isaac Act 55 financing order.

Hurricane Gustav and Hurricane Ike

In September 2008, Hurricane Gustav and Hurricane Ike caused catastrophic damage to Entergy Louisiana’s service territory.  In December 2009, Entergy Louisiana entered into a stipulation agreement with the LPSC staff regarding its storm costs.  In March and April 2010, Entergy Louisiana and other parties to the proceeding filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal to utilize Act 55 financing, which included a commitment to pass on to customers a minimum of $43.3 million of customer benefits through a prospective annual rate reduction of $8.7 million for five years.  In April 2010 the LPSC approved the settlement and subsequently issued financing orders and a ratemaking order intended to facilitate the implementation of the Act 55 financings.  In June 2010 the Louisiana State Bond Commission approved the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricane Gustav and Hurricane Ike was reduced by $2.7 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2010 the LCDA issued two series of bonds totaling $713.0 million under Act 55.  From the $702.7 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $290 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $412.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana used $412.7 million to acquire 4,126,940.15 Class B preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 9% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2010, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA, and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

Hurricane Katrina and Hurricane Rita

In August and September 2005, Hurricanes Katrina and Rita caused catastrophic damage to Entergy Louisiana’s service territory. In March 2008, Entergy Louisiana and the LURC filed at the LPSC an application requesting that the LPSC grant a financing order authorizing the financing of Entergy Louisiana storm costs, storm reserves, and issuance costs pursuant to Louisiana Act 55.  Entergy Louisiana also filed an application requesting LPSC approval for ancillary issues including the mechanism to flow charges and savings to customers via a storm cost offset rider.  In April 2008 the Louisiana Public Facilities Authority (LPFA), which is the issuer of the bonds
pursuant to the Act 55 financing, approved requests for the Act 55 financing.  Also in April 2008, Entergy Louisiana and the LPSC staff filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal under the Act 55 financing, which included a commitment to pass on to customers a minimum of $40 million of customer benefits through a prospective annual rate reduction of $8 million for five years.  The LPSC subsequently approved the settlement and issued two financing orders and one ratemaking order intended to facilitate implementation of the Act 55 financing.  In May 2008 the Louisiana State Bond Commission granted final approval of the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricanes Katrina and Rita was reduced by $22.3 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2008 the LPFA issued $687.7 million in bonds under the aforementioned Act 55.  From the $679 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $152 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $527 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $545 million, including $17.8 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 5,449,861.85 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 10% annual distribution rate.  In August 2008 the LPFA issued $278.4 million in bonds under the aforementioned Act 55.  From the $274.7 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $87 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $187.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $189.4 million, including $1.7 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 1,893,918.39 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC that carry a 10% annual distribution rate.  Distributions are payable quarterly commencing on September 15, 2008 and have a liquidation price of $100 per unit.  The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.  

The bonds were repaid in 2018. Entergy and Entergy Louisiana did not report the bonds issued by the LPFA on their balance sheets because the bonds are the obligation of the LPFA, and there was no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collected a system restoration charge on behalf of the LURC and remitted the collections to the bond indenture trustee.  Entergy and Entergy Louisiana did not report the collections as revenue because Entergy Louisiana was merely acting as the billing and collection agent for the state.

Entergy Mississippi

Entergy Mississippi has approval from the MPSC to collect a storm damage provision of $1.75 million per month. If Entergy Mississippi’s accumulated storm damage provision balance exceeds $15 million, the collection of the storm damage provision ceases until such time that the accumulated storm damage provision becomes less than $10 million. Entergy Mississippi’s storm damage provision balance has been less than $10 million since May 2019, and Entergy Mississippi has been billing the monthly storm damage provision since July 2019.
Entergy New Orleans

Hurricane Zeta

In October 2020, Hurricane Zeta caused significant damage to Entergy New Orleans’s service area. The storm resulted in widespread power outages, significant damage to distribution and transmission infrastructure, and the loss of sales during the power outages. In March 2021, Entergy New Orleans withdrew $44 million from its funded storm reserves. In May 2021, Entergy New Orleans filed an application with the City Council requesting approval and certification that its system restoration costs associated with Hurricane Zeta of approximately $36 million, including approximately $28 million in capital costs and approximately $8 million in non-capital costs, were reasonable and necessary to enable Entergy New Orleans to restore electric service to its customers and Entergy New Orleans’s electric utility infrastructure.

Entergy Texas

Hurricane Laura, Hurricane Delta, and Winter Storm Uri

In August 2020 and October 2020, Hurricane Laura and Hurricane Delta caused extensive damage to Entergy Texas’s service area. In February 2021, Winter Storm Uri also caused damage to Entergy Texas’s service area. The storms resulted in widespread power outages, significant damage primarily to distribution and transmission infrastructure, and the loss of sales during the power outages. In April 2021, Entergy Texas filed an application with the PUCT requesting a determination that approximately $250 million of system restoration costs associated with Hurricane Laura, Hurricane Delta, and Winter Storm Uri, including approximately $200 million in capital costs and approximately $50 million in non-capital costs, were reasonable and necessary to enable Entergy Texas to restore electric service to its customers and Entergy Texas’s electric utility infrastructure. The filing also included the projected balance of approximately $13 million of a regulatory asset containing previously approved system restoration costs related to Hurricane Harvey. In September 2021 the parties filed an unopposed settlement agreement, pursuant to which Entergy Texas removed from the amount to be securitized approximately $4.3 million that will instead be charged to its storm reserve, $5 million related to no particular issue, of which Entergy Texas would be permitted to seek recovery in a future proceeding, and approximately $300 thousand related to attestation costs. In December 2021 the PUCT issued an order approving the unopposed settlement and determining system restoration costs of $243 million related to Hurricane Laura, Hurricane Delta, and Winter Storm Uri and the $13 million projected remaining balance of the Hurricane Harvey system restoration costs were eligible for securitization. The order also determines that Entergy Texas can recover carrying costs on the system restoration costs related to Hurricane Laura, Hurricane Delta, and Winter Storm Uri.

In July 2021, Entergy Texas filed with the PUCT an application for a financing order to approve the securitization of the system restoration costs that are the subject of the April 2021 application. In November 2021 the parties filed an unopposed settlement agreement supporting the issuance of a financing order consistent with Entergy Texas’s application and with minor adjustments to certain upfront and ongoing costs to be incurred to facilitate the issuance and serving of system restoration bonds. In January 2022 the PUCT issued a financing order consistent with the unopposed settlement.
Entergy Texas [Member]  
Rate And Regulatory Matters RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)
Regulatory Assets and Regulatory Liabilities

Regulatory assets represent probable future revenues associated with costs that Entergy expects to recover from customers through the regulatory ratemaking process under which the Utility business operates. Regulatory liabilities represent probable future reductions in revenues associated with amounts that Entergy expects to benefit customers through the regulatory ratemaking process under which the Utility business operates. In addition to the regulatory assets and liabilities that are specifically disclosed on the face of the balance sheets, the tables below provide detail of “Other regulatory assets” and “Other regulatory liabilities” that are included on Entergy’s and the Registrant Subsidiaries’ balance sheets as of December 31, 2021 and 2020:

Other Regulatory Assets

Entergy
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
$2,327.7 $3,027.5 
Removal costs (Note 9)
1,488.8 893.8 
Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 2 - Hurricane Ida and Storm Cost Recovery Filings with Retail Regulators and Note 5 - Securitization Bonds)
993.6 379.2 
Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
935.5 1,018.9 
Retired electric and gas meters - recovered through retail rates as determined by retail regulators
179.4 192.1 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
133.1 105.7 
Opportunity Sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding) (b)
131.8 131.8 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
113.2 16.9 
Unamortized loss on reacquired debt - recovered over term of debt
74.7 79.2 
Retail rate deferrals - recovered through formula rates or rate riders as rates are redetermined by retail regulators
66.1 66.0 
Attorney General litigation costs - recovered over a six-year period through March 2026 (b)
20.5 25.3 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
19.0 — 
New nuclear generation development costs - recovery through formula rate plan December 2014 through November 2022 (b)
6.8 14.2 
Other123.1 125.9 
Entergy Total$6,613.3 $6,076.5 
Entergy Arkansas
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
$640.0 $831.5 
Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
489.2 479.3 
Removal costs (Note 9)
224.3 212.6 
Opportunity sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding) (b)
131.8 131.8 
Retired electric meters - recovered over 15-year period through March 2034
43.4 46.9 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
39.8 9.5 
Storm damage costs - recovered either through securitization or retail rates (Note 5 - Entergy Arkansas Securitization Bonds)
39.3 42.7 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
32.6 10.5 
Unamortized loss on reacquired debt - recovered over term of debt
23.1 24.7 
ANO Fukushima and Flood Barrier costs - recovered through retail rates through February 2026 (Note 2 - Retail Rate Proceedings) (b)
7.3 9.1 
Retail rate deferrals - recovered through rate riders as rates are redetermined annually (b)
1.0 12.6 
Other17.9 21.2 
Entergy Arkansas Total$1,689.7 $1,832.4 
Entergy Louisiana
 20212020
 (In Millions)
Removal costs (Note 9)
$848.2 $302.5 
Storm damage costs, including hurricane costs - recovery expected through retail rates and securitization (Note 2 - Hurricane Ida and Storm Cost Recovery Filings with Retail Regulators)
773.6 94.0 
Pension & postretirement costs (Note 11 - Qualified Pension Plans and Non-Qualified Pension Plans) (a)
592.7 799.4 
Asset Retirement Obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
286.6 299.0 
Retired electric meters - recovered over a 22-year period through July 2041
91.7 96.4 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
56.3 48.8 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
55.0 5.4 
Unamortized loss on reacquired debt - recovered over term of debt
26.9 26.6 
New nuclear generation development costs - recovery through formula rate plan December 2014 through November 2022 (b)
6.7 14.0 
Other39.0 40.0 
Entergy Louisiana Total$2,776.7 $1,726.1 

Entergy Mississippi
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
$175.4 $242.7 
Removal costs (Note 9)
136.8 107.3 
Retail rate deferrals - returned through formula rates or rate riders as rates are redetermined annually
48.1 44.3 
Attorney General litigation costs - recovered over a six-year period through March 2026 (b)
20.5 25.3 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
19.0 — 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
15.0 19.2 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
13.8 2.0 
Unamortized loss on reacquired debt - recovered over term of debt
12.2 13.5 
Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
8.4 7.9 
Other13.2 5.1 
Entergy Mississippi Total$462.4 $467.3 
Entergy New Orleans
 20212020
 (In Millions)
Removal costs (Note 9)
$91.7 $63.2 
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
44.9 75.7 
Storm damage costs, including hurricane costs - recovered through securitization or retail rates (Note 2 - Storm Cost Recovery Filings with Retail Regulators and Note 5 - Entergy New Orleans Securitization Bonds - Hurricane Isaac)
31.2 55.2 
Retired meters - recovered over a 12-year period through July 2031 (b)
19.6 21.7 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
17.4 14.3 
Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
5.4 5.2 
Unamortized loss on reacquired debt - recovered over term of debt
1.6 1.9 
Other36.8 29.6 
Entergy New Orleans Total$248.6 $266.8 

Entergy Texas
 20212020
 (In Millions)
Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 2 - Storm Cost Recovery Filings with Retail Regulators and Note 5 - Entergy Texas Securitization Bonds - Hurricane Rita and Entergy Texas Securitization Bonds - Hurricane Ike and Hurricane Gustav)
$143.1 $187.3 
Removal costs (Note 9)
98.1 115.3 
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
96.0 140.1 
Retired electric meters - recovered over 13-year period through February 2032
23.7 26.0 
Neches and Sabine costs - recovered over a 10-year period through September 2028 (Note 2 - Retail Rate Proceedings)
16.4 18.8 
Pension & postretirement benefits expense deferral - recovery period to be determined (Note 11 - Entergy Texas Reserve)
14.6 3.8 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
11.7 12.9 
Unamortized loss on reacquired debt - recovered over term of debt
9.8 10.5 
Other7.9 10.0 
Entergy Texas Total$421.3 $524.7 
System Energy
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans and Other Postretirement Benefits) (a)
$160.3 $217.8 
Asset retirement obligation - recovery dependent upon timing of decommissioning (Note 9) (a)
144.4 226.3 
Removal costs - recovered through depreciation rates (Note 9)
89.7 92.9 
Unamortized loss on reacquired debt - recovered over term of debt
1.1 2.0 
System Energy Total$395.5 $539.0 

(a)Does not earn a return on investment, but is offset by related liabilities.
(b)Does not earn a return on investment.

Hurricane Ida

In August 2021, Hurricane Ida caused extensive damage to the Entergy distribution and, to a lesser extent, transmission systems across Louisiana resulting in widespread power outages. Total restoration costs for the repair and/or replacement of the electrical system damaged by Hurricane Ida for Entergy Louisiana and Entergy New Orleans are currently estimated to be approximately $2.7 billion. Also, Utility revenues in 2021 were adversely affected by extended power outages resulting from the hurricane.

Entergy has recorded accounts payable for the estimated costs incurred that were necessary to return customers to service. Entergy recorded corresponding regulatory assets of approximately $1.1 billion, including $1 billion at Entergy Louisiana and $80 million at Entergy New Orleans, and construction work in progress of approximately $1.6 billion, including $1.5 billion at Entergy Louisiana and $120 million at Entergy New Orleans. Entergy recorded the regulatory assets in accordance with its accounting policies and based on the historic treatment of such costs in its service area because management believes that recovery through some form of regulatory mechanism is probable. There are well-established mechanisms and precedent for addressing these catastrophic events and providing for recovery of prudently incurred storm costs in accordance with applicable regulatory and legal principles. Because Entergy has not gone through the regulatory process regarding these storm costs, there is an element of risk, and Entergy is unable to predict with certainty the degree of success it may have in its recovery initiatives, the amount of restoration costs that it may ultimately recover, or the timing of such recovery.

Entergy is considering all available avenues to recover storm-related costs from Hurricane Ida, including federal government assistance and securitization financing. In September 2021, Entergy Louisiana filed an application at the LPSC seeking approval of certain ratemaking adjustments in connection with the issuance of approximately $1 billion of shorter-term mortgage bonds to provide interim financing for restoration costs associated with Hurricane Ida, which bonds were issued in October 2021. Also in September 2021, as discussed below in “Storm Cost Filings with Retail Regulators - Entergy Louisiana - Hurricane Laura, Hurricane Delta, Hurricane Zeta, Winter Storm Uri, and Hurricane Ida,” Entergy Louisiana sought approval for the creation and funding of a $1 billion restricted escrow account for Hurricane Ida restoration costs, subject to a subsequent prudence review. In September 2021, Entergy New Orleans withdrew $39 million from its funded storm reserves. Storm cost recovery or financing will be subject to review by applicable regulatory authorities. In February 2022, Entergy New Orleans filed with the City Council a securitization application requesting that the City Council review Entergy New Orleans’s storm reserve and increase the storm reserve funding level to $150 million, to be funded through securitization.
Other Regulatory Liabilities

Entergy
 20212020
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$1,993.3 $1,694.1 
Louisiana Act 55 financing savings obligation (Note 3) (b)
127.4 144.3 
Retail rate over-recovery - refunded through formula rate or rate riders as rates are redetermined annually
126.5 75.1 
Vidalia purchased power agreement (Note 8) (b)
106.2 115.7 
Grand Gulf sale-leaseback - (Note 5 - Grand Gulf Sale-Leaseback Transactions)
55.6 55.6 
Asset retirement obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
45.5 29.7 
Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4 44.4 
Internal restructuring guaranteed tax credits19.8 26.4 
Deferred tax equity partnership earnings (Note 1)
18.1 — 
Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates December 2015 through November 2024
16.0 21.5 
Advanced metering system (AMS) surcharge - return to customers dependent upon AMS spend
7.3 20.1 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
— 43.5 
Other83.7 53.5 
Entergy Total$2,643.8 $2,323.9 

Entergy Arkansas
 20212020
 (In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$685.4 $597.4 
Internal restructuring guaranteed customer credits19.8 26.4 
Retail rate rider over-recovery - refunded through rate riders as rates are redetermined annually
18.9 19.6 
Deferred tax equity partnership earnings (Note 1)
18.1 — 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
— 43.5 
Other1.1 — 
Entergy Arkansas Total$743.3 $686.9 
Entergy Louisiana
 20212020
 (In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$692.2 $567.7 
Louisiana Act 55 financing savings obligation (Note 3)
127.4 144.3 
Vidalia purchased power agreement (Note 8) (b)
106.2 115.7 
Asset retirement obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
45.5 29.7 
Retail rate rider over-recovery - refunded through rate riders as rates are determined annually
30.7 36.0 
Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates December 2015 through November 2024
16.0 21.5 
Derivative Instruments & Hedging Activities (Note 15)
11.4 — 
Other13.2 3.4 
Entergy Louisiana Total$1,042.6 $918.3 

Entergy Mississippi
 20212020
 (In Millions)
Retail rate rider over-recovery - refunded through rate riders as rates are redetermined annually
$34.2 $14.2 
Grand Gulf over-recovery - returned to customers through rate riders as rates are redetermined annually
15.1 1.0 
Other— 0.6 
Entergy Mississippi Total$49.3 $15.8 

Entergy Texas
 20212020
 (In Millions)
Retail refunds - return to customers to be determined
$22.8 $— 
Advanced metering system (AMS) surcharge - returned to customers dependent upon AMS spend
7.3 20.1 
Income tax rate change - refunded through a rate rider (Note 2 - Retail Rate Proceedings)
2.7 6.5 
Transition to competition costs - returned to customers through rate riders when rates are redetermined periodically
— 3.2 
Other 4.3 2.5 
Entergy Texas Total$37.1 $32.3 
System Energy
 20212020
 (In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$615.7 $529.0 
Grand Gulf sale-leaseback - (Note 5 - Grand Gulf Sale-Leaseback Transactions)
55.6 55.6 
Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4 44.4 
Grand Gulf sale-leaseback accumulated deferred income taxes (a)
25.6 25.7 
Entergy Mississippis accumulated accelerated Grand Gulf amortization - amortized and credited through the Unit Power Sales Agreement
3.6 10.7 
System Energy Total$744.9 $665.4 

(a)Offset by related asset.
(b)As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21% effective January 2018, the Vidalia purchased power agreement regulatory liability was reduced by $30.5 million and the Louisiana Act 55 financing savings obligation regulatory liabilities were reduced by $25 million, with corresponding increases to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

Regulatory activity regarding the Tax Cuts and Jobs Act

See the “Other Tax Matters - Tax Cuts and Jobs Act” section in Note 3 to the financial statements for discussion of the effects of the December 2017 enactment of the Tax Cuts and Jobs Act (Tax Act), including its effects on Entergy’s and the Registrant Subsidiaries’ regulatory asset/liability for income taxes.

Entergy Arkansas

Consistent with its previously stated intent to return unprotected excess accumulated deferred income taxes to customers as expeditiously as possible, Entergy Arkansas initiated a tariff proceeding in February 2018 proposing to establish a tax adjustment rider to provide retail customers with certain tax benefits of $467 million associated with the Tax Act. For the residential customer class, unprotected excess accumulated deferred income taxes were returned to customers over a 21-month period from April 2018 through December 2019. For all other customer classes, unprotected excess accumulated deferred income taxes were returned to customers over a nine-month period from April 2018 through December 2018. A true-up provision also was included in the rider, with any over- or under-returned unprotected excess accumulated deferred income taxes credited or billed to customers during the billing month of January 2020, with any residual amounts of over- or under-returned unprotected excess accumulated deferred income taxes to be flowed through Entergy Arkansas’s energy cost recovery rider. In March 2018 the APSC approved the tax adjustment rider effective with the first billing cycle of April 2018.

As discussed below, in July 2018, Entergy Arkansas made its formula rate plan filing to set its formula rate for the 2019 calendar year. A hearing was held in May 2018 regarding the APSC’s inquiries into the effects of the Tax Act, including Entergy Arkansas’s proposal to utilize its formula rate plan rider for its customers to realize the remaining benefits of the Tax Act. Entergy Arkansas’s formula rate plan rider included a netting adjustment that compared actual annual results to the allowed rate of return on common equity. In July 2018 the APSC issued an order agreeing with Entergy Arkansas’s proposal to have the effects of the Tax Act on current income tax expense flow through Entergy Arkansas’s formula rate plan rider and with Entergy Arkansas’s treatment of protected and unprotected excess accumulated deferred income taxes. The APSC also directed Entergy Arkansas to submit in the tax adjustment rider proceeding, discussed above, the adjustments to all other riders affected by the Tax Act and to include an amendment for a true up mechanism where a rider affected by the Tax Act does not already contain a
true-up mechanism. Pursuant to a 2018 settlement agreement in Entergy Arkansas’s formula rate plan proceeding, Entergy Arkansas also removed the net operating loss accumulated deferred income tax asset caused by the Tax Act from Entergy Arkansas’s tax adjustment rider. Entergy Arkansas’s compliance tariff filings were accepted by the APSC in October 2018. In February 2021, pursuant to its 2020 formula rate plan evaluation report settlement, Entergy Arkansas flowed $5.6 million in credits to customers through the tax adjustment rider based on the outcome of certain federal tax positions and a decrease in the state tax rate.

Entergy Louisiana

In an electric formula rate plan settlement approved by the LPSC in April 2018 the parties agreed that Entergy Louisiana would return to customers one-half of its eligible unprotected excess deferred income taxes from May 2018 through December 2018 and return to customers the other half from January 2019 through August 2022. In addition, the settlement provided that in order to flow back to customers certain other tax benefits created by the Tax Act, Entergy Louisiana established a regulatory liability effective January 1, 2018 in the amount of $9.1 million per month to reflect these tax benefits already included in retail rates until new base rates under the formula rate plan were established in September 2018, and this regulatory liability was returned to customers over the September 2018 through August 2019 formula rate plan rate-effective period. The LPSC staff and intervenors in the settlement reserved the right to obtain data from Entergy Louisiana to confirm the determination of excess accumulated deferred income taxes resulting from the Tax Act and the analysis thereof as part of the formula rate plan review proceeding for the 2017 test year filing which, as discussed below, Entergy Louisiana filed in June 2018.

Entergy New Orleans

After enactment of the Tax Act the City Council passed a resolution ordering Entergy New Orleans to, effective January 1, 2018, record deferred regulatory liabilities to account for the Tax Act’s effect on Entergy New Orleans’s revenue requirement and to make a filing by mid-March 2018 regarding the Tax Act’s effects on Entergy New Orleans’s operating income and rate base and potential mechanisms for customers to receive benefits of the Tax Act. The City Council’s resolution also directed Entergy New Orleans to request that Entergy Services file with the FERC for revisions of the Unit Power Sales Agreement and MSS-4 replacement tariffs to address the return of excess accumulated deferred income taxes. Entergy submitted filings of this type to the FERC.

In March 2018, Entergy New Orleans filed its response to the resolution stating that the Tax Act reduced income tax expense from what was then reflected in rates by approximately $8.2 million annually for electric operations and by approximately $1.3 million annually for gas operations. In the filing, Entergy New Orleans proposed to return to customers from June 2018 through August 2019 the benefits of the reduction in income tax expense and its unprotected excess accumulated deferred income taxes through a combination of bill credits and investments in energy efficiency programs, grid modernization, and Smart City projects. Entergy New Orleans submitted supplemental information in April 2018 and May 2018. Shortly thereafter, Entergy New Orleans and the City Council’s advisors reached an agreement in principle that provides for benefits that will be realized by Entergy New Orleans customers through bill credits that started in July 2018 and offsets to future investments in energy efficiency programs, grid modernization, and Smart City projects, as well as additional benefits related to the filings made at the FERC. The agreement in principle was approved by the City Council in June 2018.

Entergy Texas

After enactment of the Tax Act the PUCT issued an order requiring most utilities, including Entergy Texas, beginning January 25, 2018, to record a regulatory liability for the difference between revenues collected under existing rates and revenues that would have been collected had existing rates been set using the new federal income tax rates and also for the balance of excess accumulated deferred income taxes. Entergy Texas had previously provided information to the PUCT staff and stated that it expected the PUCT to address the lower tax expense as part of Entergy Texas’s rate case expected to be filed in May 2018.
In May 2018, Entergy Texas filed its 2018 base rate case with the PUCT. Entergy Texas’s proposed rates and revenues reflected the inclusion of the federal income tax reductions due to the Tax Act. The PUCT issued an order in December 2018 establishing that 1) $25 million be credited to customers through a rider to reflect the lower federal income tax rate applicable to Entergy Texas from January 2018 through the date new rates were implemented, 2) $242.5 million of protected excess accumulated deferred income taxes be returned to customers through base rates under the average rate assumption method over the lives of the associated assets, and 3) $185.2 million of unprotected excess accumulated deferred income taxes be returned to customers through a rider. The unprotected excess accumulated deferred income taxes rider includes carrying charges and is in effect over a period of 12 months for larger customers and over a period of four years for other customers.

System Energy

In a filing made with the FERC in March 2018, System Energy proposed revisions to the Unit Power Sales Agreement to reflect the effects of the Tax Act. In the filing System Energy proposed to return identified quantities of unprotected excess accumulated deferred income taxes to its customers by the end of 2018. In May 2018 the FERC accepted System Energy’s proposed tax revisions with an effective date of June 1, 2018, subject to refund and the outcome of settlement and hearing procedures. Settlement discussions were terminated in April 2019, and a hearing was held in March 2020. The retail regulators of the Utility operating companies that are parties to the Unit Power Sales Agreement challenged the treatment and amount of excess accumulated deferred income tax liabilities associated with uncertain tax positions related to nuclear decommissioning. In July 2020 the presiding ALJ in the proceeding issued an initial decision finding that there is an additional $147 million in unprotected excess accumulated deferred income taxes related to System Energy’s uncertain decommissioning tax deduction. The initial decision determined that System Energy should have included the $147 million in its March 2018 filing. System Energy had not included credits related to the effect of the Tax Act on the uncertain decommissioning tax position because it was uncertain whether the IRS would allow the deduction. The initial decision rejected both System Energy’s alternative argument that any crediting should occur over a ten-year period and the retail regulators’ argument that any crediting should occur over a two-year period. Instead, the initial decision concluded that System Energy should credit the additional unprotected excess accumulated deferred income taxes in a single lump sum revenue requirement reduction following a FERC order addressing the initial decision.

The ALJ initial decision is an interim step in the FERC litigation process. In September 2020, System Energy filed a brief on exceptions with the FERC, re-urging its positions and requesting the reversal of the ALJ’s initial decision. In December 2020, the LPSC, APSC, MPSC, City Council, and FERC trial staff filed briefs opposing exceptions. The FERC will review the case and issue an order in the proceeding, and the FERC may accept, reject, or modify the ALJ’s initial decision in whole or in part. Credits, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.

As discussed below in Grand Gulf Sale-leaseback Renewal Complaint and Uncertain Tax Position Rate Base Issue,” in September 2020 the IRS issued a Notice of Proposed Adjustment (NOPA) and Entergy executed it. In September 2020, System Energy filed a motion to lodge the NOPA into the record in the FERC proceeding. In October 2020 the LPSC, APSC, MPSC, City Council, and FERC trial staff filed oppositions to System Energy’s motion. As a result of the NOPA, System Energy filed, in October 2020, a new Federal Power Act section 205 filing at the FERC to credit the excess accumulated deferred income taxes resulting from the decommissioning uncertain tax position. System Energy proposes to credit the entire amount of the excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position by issuing a one-time credit of $17.8 million. In November 2020, the LPSC, APSC, MPSC, and City Council filed a protest to the filing, and System Energy responded.

In November 2020 the IRS issued the Revenue Agent’s Report (RAR) for the 2014-2015 tax years and in December 2020 Entergy executed it. In December 2020, System Energy filed a motion to lodge the RAR into the record in the FERC proceeding addressing the Tax Cuts and Jobs Act. In January 2021 the LPSC, APSC, MPSC,
and City Council filed a joint answer opposing System Energy’s motion, and the FERC trial staff also filed an answer opposing System Energy’s motion.

As a result of the RAR, in December 2020, System Energy also filed an amendment to its Federal Power Act section 205 filing to credit excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position. The amendment proposed the inclusion of the RAR as support for the filing. In December 2020, the LPSC, APSC, and City Council filed a protest in response to the amendment, reiterating objections to the filing to credit excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position. In February 2021 the FERC issued an order accepting System Energy’s Federal Power Act section 205 filing subject to refund, setting it for hearing, and holding the hearing in abeyance.

In November 2020, System Energy filed a motion to vacate the ALJ’s decision, arguing that it had been overtaken by changed circumstances because of the IRS’s determination resulting from the NOPA and RAR. In January 2021 the LPSC, APSC, MPSC, and City Council filed a joint answer opposing System Energy’s motion, and the FERC trial staff also filed an answer opposing System Energy’s motion. Additional responsive pleadings were filed in February and March 2021. There is no formal deadline for FERC to rule on the motion.

Fuel and purchased power cost recovery

The Utility operating companies are allowed to recover fuel and purchased power costs through fuel mechanisms included in electric and gas rates that are recorded as fuel cost recovery revenues.  The difference between revenues collected and the current fuel and purchased power costs is generally recorded as “Deferred fuel costs” on the Utility operating companies’ financial statements.  The table below shows the amount of deferred fuel costs as of December 31, 2021 and 2020 that Entergy expects to recover (or return to customers) through fuel mechanisms, subject to subsequent regulatory review.

 20212020
 (In Millions)
Entergy Arkansas (a)$177.6 $15.2 
Entergy Louisiana (b)$213.5 $170.4 
Entergy Mississippi$121.9 ($14.7)
Entergy New Orleans (b)($3.5)$6.2 
Entergy Texas$48.3 ($85.4)

(a)Includes $68.8 million in 2021 and $68.2 million in 2020 of fuel and purchased power costs whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.
(b)Includes $168.1 million in both years for Entergy Louisiana and $4.1 million in both years for Entergy New Orleans of fuel, purchased power, and capacity costs, which do not currently earn a return on investment and whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.

Entergy Arkansas

Energy Cost Recovery Rider

Entergy Arkansas’s retail rates include an energy cost recovery rider to recover fuel and purchased energy costs in monthly customer bills.  The rider utilizes the prior calendar-year energy costs and projected energy sales for the twelve-month period commencing on April 1 of each year to develop an energy cost rate, which is redetermined annually and includes a true-up adjustment reflecting the over- or under-recovery, including carrying
charges, of the energy costs for the prior calendar year.  The energy cost recovery rider tariff also allows an interim rate request depending upon the level of over- or under-recovery of fuel and purchased energy costs.

In January 2014, Entergy Arkansas filed a motion with the APSC relating to its upcoming energy cost rate redetermination filing that was made in March 2014. In that motion, Entergy Arkansas requested that the APSC authorize Entergy Arkansas to exclude from the redetermination of its 2014 energy cost rate $65.9 million of incremental fuel and replacement energy costs incurred in 2013 as a result of the ANO stator incident. Entergy Arkansas requested that the APSC authorize Entergy Arkansas to retain that amount in its deferred fuel balance, with recovery to be reviewed in a later period after more information was available regarding various claims associated with the ANO stator incident. In February 2014 the APSC approved Entergy Arkansas’s request to retain that amount in its deferred fuel balance. In July 2017, Entergy Arkansas filed for a change in rates pursuant to its formula rate plan rider. In that proceeding, the APSC approved a settlement agreement agreed upon by the parties, including a provision that requires Entergy Arkansas to initiate a regulatory proceeding for the purpose of recovering funds currently withheld from rates and related to the stator incident, including the $65.9 million of deferred fuel and purchased energy costs previously noted, subject to certain timelines and conditions set forth in the settlement agreement. In October 2021 the APSC approved Entergy Arkansas’s second request to extend the deadline for initiating a regulatory proceeding for the purpose of recovering funds related to the stator incident for twelve additional months, or until December 1, 2022. See the “ANO Damage, Outage, and NRC Reviews” section in Note 8 to the financial statements for further discussion of the ANO stator incident.

In March 2017, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01164 per kWh to $0.01547 per kWh. The APSC staff filed testimony in March 2017 recommending that the redetermined rate be implemented with the first billing cycle of April 2017 under the normal operation of the tariff. Accordingly, the redetermined rate went into effect on March 31, 2017 pursuant to the tariff. In July 2017 the Arkansas Attorney General requested additional information to support certain of the costs included in Entergy Arkansas’s 2017 energy cost rate redetermination.

In March 2018, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01547 per kWh to $0.01882 per kWh. The Arkansas Attorney General filed a response to Entergy Arkansas’s annual redetermination filing requesting that the APSC suspend the proposed tariff to investigate the amount of the redetermination or, alternatively, to allow recovery subject to refund. Among the reasons the Attorney General cited for suspension were questions pertaining to how Entergy Arkansas forecasted sales and potential implications of the Tax Cuts and Jobs Act. Entergy Arkansas replied to the Attorney General’s filing and stated that, to the extent there are questions pertaining to its load forecasting or the operation of the energy cost recovery rider, those issues exceed the scope of the instant rate redetermination. Entergy Arkansas also stated that potential effects of the Tax Cuts and Jobs Act are appropriately considered in the APSC’s separate proceeding regarding potential implications of the tax law. The APSC general staff filed a reply to the Attorney General’s filing and agreed that Entergy Arkansas’s filing complied with the terms of the energy cost recovery rider. The redetermined rate became effective with the first billing cycle of April 2018. Subsequently in April 2018 the APSC issued an order declining to suspend Entergy Arkansas’s energy cost recovery rider rate and declining to require further investigation at that time of the issues suggested by the Attorney General in the proceeding. Following a period of discovery, the Attorney General filed a supplemental response in October 2018 raising new issues with Entergy Arkansas’s March 2018 rate redetermination and asserting that $45.7 million of the increase should be collected subject to refund pending further investigation. Entergy Arkansas filed to dismiss the Attorney General’s supplemental response, the APSC general staff filed a motion to strike the Attorney General’s filing, and the Attorney General filed a supplemental response disputing Entergy Arkansas and the APSC staff’s filing. Applicable APSC rules and processes authorize its general staff to initiate periodic audits of Entergy Arkansas’s energy cost recovery rider. In late-2018 the APSC general staff notified Entergy Arkansas it has initiated an audit of the 2017 fuel costs. The time in which the audit will be complete is uncertain at this time.
In March 2019, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected a decrease from $0.01882 per kWh to $0.01462 per kWh and became effective with the first billing cycle in April 2019. In March 2019 the Arkansas Attorney General filed a response to Entergy Arkansas’s annual adjustment and included with its filing a motion for investigation of alleged overcharges to customers in connection with the FERC’s October 2018 order in the opportunity sales proceeding. Entergy Arkansas filed its response to the Attorney General’s motion in April 2019 in which Entergy Arkansas stated its intent to initiate a proceeding to address recovery issues related to the October 2018 FERC order. In May 2019, Entergy Arkansas initiated the opportunity sales recovery proceeding, discussed below, and requested that the APSC establish that proceeding as the single designated proceeding in which interested parties may assert claims related to the appropriate retail rate treatment of the FERC October 2018 order and related FERC orders in the opportunity sales proceeding. In June 2019 the APSC granted Entergy Arkansas’s request and also denied the Attorney General’s motion in the energy cost recovery proceeding seeking an investigation into Entergy Arkansas’s annual energy cost recovery rider adjustment and referred the evaluation of such matters to the opportunity sales recovery proceeding.

In March 2020, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected a decrease from $0.01462 per kWh to $0.01052 per kWh. The redetermined rate became effective with the first billing cycle in April 2020 through the normal operation of the tariff.

In March 2021, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected a decrease from $0.01052 per kWh to $0.00959 per kWh. The redetermined rate calculation also included an adjustment to account for a portion of the increased fuel costs resulting from the February 2021 winter storms. The redetermined rate became effective with the first billing cycle in April 2021 through the normal operation of the tariff.

Entergy Louisiana

Entergy Louisiana recovers electric fuel and purchased power costs for the billing month based upon the level of such costs incurred two months prior to the billing month. Entergy Louisiana’s purchased gas adjustments include estimates for the billing month adjusted by a surcharge or credit that arises from an annual reconciliation of fuel costs incurred with fuel cost revenues billed to customers, including carrying charges.

In July 2014 the LPSC authorized its staff to initiate an audit of the fuel adjustment clause filings by Entergy Gulf States Louisiana, whose business was combined with Entergy Louisiana in 2015. The audit includes a review of the reasonableness of charges flowed through Entergy Gulf States Louisiana’s fuel adjustment clause for the period from 2010 through 2013. In January 2019 the LPSC staff consultant issued its audit report. In its report, the LPSC staff consultant recommended that Entergy Louisiana refund approximately $900,000, plus interest, to customers based upon the imputation of a claim of vendor fault in servicing its nuclear plant. Entergy Louisiana recorded a provision in the first quarter 2019 for the potential outcome of the audit. In August 2019, Entergy Louisiana filed direct testimony challenging the basis for the LPSC staff’s recommended disallowance and providing an alternative calculation of replacement power costs should it be determined that a disallowance is appropriate. Entergy Louisiana’s calculation would require no refund to customers.

In July 2014 the LPSC authorized its staff to initiate an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed by Entergy Louisiana through its fuel adjustment clause for the period from 2010 through 2013. In January 2019 the LPSC staff issued its audit report recommending that Entergy Louisiana refund approximately $7.3 million, plus interest, to customers based upon the imputation of a claim of vendor fault in servicing its nuclear plant. Entergy Louisiana recorded a provision in the first quarter 2019 for the potential outcome of the audit. In August 2019, Entergy Louisiana filed direct testimony challenging the basis for the LPSC staff’s recommended disallowance and providing an alternative calculation of replacement power costs should it be determined that a disallowance is appropriate. Entergy Louisiana’s calculation
would require a refund to customers of approximately $4.3 million, plus interest, as compared to the LPSC staff’s recommendation of $7.3 million, plus interest. Responsive testimony was filed by the LPSC staff and intervenors in September 2019; all parties either agreed with or did not oppose Entergy Louisiana’s alternative calculation of replacement power costs.

In November 2019 the pending LPSC proceedings for the 2010-2013 Entergy Louisiana and Entergy Gulf States Louisiana audits were consolidated to facilitate a settlement of both fuel audits. In December 2019 an unopposed settlement was reached that requires a refund to legacy Entergy Louisiana customers of approximately $2.3 million, including interest, and no refund to legacy Entergy Gulf States Louisiana customers. The LPSC approved the settlement in January 2020. A one-time refund was made in February 2020.

In March 2020 the LPSC staff provided notice of an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s fuel adjustment clause for the period from 2016 through 2019. In September 2021 the LPSC submitted its audit report and found that all costs recovered through the fuel adjustment clause were reasonable and eligible for recovery through the fuel adjustment clause. Intervenors are conducting discovery regarding the LPSC staff’s report.

In February 2021, Entergy Louisiana incurred extraordinary fuel costs associated with the February 2021 winter storms. To mitigate the effect of these costs on customer bills, in March 2021 Entergy Louisiana requested and the LPSC approved the deferral and recovery of $166 million in incremental fuel costs over five months beginning in April 2021. The incremental fuel costs remain subject to review for reasonableness and eligibility for recovery through the fuel adjustment clause mechanism. The final amount of incremental fuel costs is subject to change through the resettlement process. At its April 2021 meeting, the LPSC authorized its staff to review the prudence of the February 2021 fuel costs incurred by all LPSC-jurisdictional utilities. At its June 2021 meeting, the LPSC approved the hiring of consultants to assist its staff in this review. Discovery is ongoing.

In March 2021 the LPSC staff provided notice of an audit of Entergy Louisiana’s purchased gas adjustment clause filings covering the period January 2018 through December 2020. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s purchased gas adjustment clause for that period. Discovery is ongoing, and no audit report has been filed.

Entergy Mississippi

Entergy Mississippi’s rate schedules include an energy cost recovery rider that is adjusted annually to reflect accumulated over- or under-recoveries.  Entergy Mississippi’s fuel cost recoveries are subject to annual audits conducted pursuant to the authority of the MPSC.

In November 2018, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an under-recovery of approximately $57 million as of September 30, 2018. In January 2019 the MPSC approved the proposed energy cost factor effective for February 2019 bills.

In November 2019, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation included $39.6 million of prior over-recovery flowing back to customers beginning February 2020. Entergy Mississippi’s balance in its deferred fuel account did not decrease as expected after implementation of the new factor. In an effort to assist customers during the COVID-19 pandemic, in May 2020, Entergy Mississippi requested an interim adjustment to the energy cost recovery rider to credit approximately $50 million from the over-recovered balance in the deferred fuel account to customers over four consecutive billing months. The MPSC approved this interim adjustment in May 2020 effective for June through September 2020 bills.
In November 2020, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an over-recovery of approximately $24.4 million as of September 30, 2020. In January 2021 the MPSC approved the proposed energy cost factor effective for February 2021 bills.

In November 2021, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an under-recovery of approximately $80.6 million as of September 30, 2021. In December 2021, at the request of the MPSC, Entergy Mississippi submitted a proposal to mitigate the impact of rising fuel costs on customer bills during 2022. Entergy Mississippi proposed that the deferred fuel balance as of December 31, 2021, which was $121.9 million, be amortized over three years, and that the MPSC authorize Entergy Mississippi to apply its weighted-average cost of capital as the carrying cost for the unamortized fuel balance. In January 2022 the MPSC approved the amortization of $100 million of the deferred fuel balance over two years and authorized Entergy Mississippi to apply its weighted-average cost of capital as the carrying cost for the unamortized fuel balance. The MPSC approved the proposed energy cost factor effective for February 2022 bills.

Entergy New Orleans

Entergy New Orleans’s electric rate schedules include a fuel adjustment tariff designed to reflect no more than targeted fuel and purchased power costs, adjusted by a surcharge or credit for deferred fuel expense arising from the monthly reconciliation of actual fuel and purchased power costs incurred with fuel cost revenues billed to customers, including carrying charges.

Entergy New Orleans’s gas rate schedules include a purchased gas adjustment to reflect estimated gas costs for the billing month, adjusted by a surcharge or credit similar to that included in the electric fuel adjustment clause, including carrying charges.

Entergy Texas

Entergy Texas’s rate schedules include a fixed fuel factor to recover fuel and purchased power costs, including interest, not recovered in base rates.  Semi-annual revisions of the fixed fuel factor are made in March and September based on the market price of natural gas and changes in fuel mix.  The amounts collected under Entergy Texas’s fixed fuel factor and any interim surcharge or refund are subject to fuel reconciliation proceedings before the PUCT. A fuel reconciliation is required to be filed at least once every three years and outside of a base rate case filing.

In September 2019, Entergy Texas filed an application to reconcile its fuel and purchased power costs for the period from April 2016 through March 2019. During the reconciliation period, Entergy Texas incurred approximately $1.6 billion in Texas jurisdictional eligible fuel and purchased power expenses, net of certain revenues credited to such expenses and other adjustments. Entergy Texas estimated an under-recovery balance of approximately $25.8 million, including interest, which Entergy Texas requested authority to carry over as the beginning balance for the subsequent reconciliation period beginning April 2019. In March 2020 an intervenor filed testimony proposing that the PUCT disallow: (1) $2 million in replacement power costs associated with generation outages during the reconciliation period; and (2) $24.4 million associated with the operation of the Spindletop natural gas storage facility during the reconciliation period.  In April 2020, Entergy Texas filed rebuttal testimony refuting all points raised by the intervenor.  In June 2020 the parties filed a stipulation and settlement agreement, which included a $1.2 million disallowance not associated with any particular issue raised by any party. The PUCT approved the settlement in August 2020.

In July 2020, Entergy Texas filed an application with the PUCT to implement an interim fuel refund of $25.5 million, including interest. Entergy Texas proposed that the interim fuel refund be implemented beginning with the first August 2020 billing cycle over a three-month period for smaller customers and in a lump sum amount
in the billing month of August 2020 for transmission-level customers. The interim fuel refund was approved in July 2020, and Entergy Texas began refunds in August 2020.

In February 2021, Entergy Texas filed an application to implement a fuel refund for a cumulative over-recovery of approximately $75 million that is primarily attributable to settlements received by Entergy Texas from MISO related to Hurricane Laura. Entergy Texas planned to issue the refund over the period of March through August 2021. On February 22, 2021, Entergy Texas filed a motion to abate its fuel refund proceeding to assess how the February 2021 winter storm impacted Entergy Texas’s fuel over-recovery position. In March 2021, Entergy Texas withdrew its application to implement the fuel refund. Entergy Texas is continuing to evaluate its fuel balance and will file a subsequent refund or surcharge application consistent with the requirements of the PUCT’s rules.
Entergy Arkansas Opportunity Sales Proceeding

In June 2009 the LPSC filed a complaint requesting that the FERC determine that certain of Entergy Arkansas’s sales of electric energy to third parties: (a) violated the provisions of the System Agreement that allocated the energy generated by Entergy System resources; (b) imprudently denied the Entergy System and its ultimate consumers the benefits of low-cost Entergy System generating capacity; and (c) violated the provision of the System Agreement that prohibited sales to third parties by individual companies absent an offer of a right-of-first-refusal to other Utility operating companies.  The LPSC’s complaint challenged sales made beginning in 2002 and requested refunds.  In July 2009 the Utility operating companies filed a response to the complaint arguing among other things that the System Agreement contemplates that the Utility operating companies may make sales to third parties for their own account, subject to the requirement that those sales be included in the load (or load shape) for the applicable Utility operating company.  The FERC subsequently ordered a hearing in the proceeding.

After a hearing, the ALJ issued an initial decision in December 2010.  The ALJ found that the System Agreement allowed for Entergy Arkansas to make the sales to third parties but concluded that the sales should be accounted for in the same manner as joint account sales.  The ALJ concluded that “shareholders” should make refunds of the damages to the Utility operating companies, along with interest.  Entergy disagreed with several aspects of the ALJ’s initial decision and in January 2011 filed with the FERC exceptions to the decision.
The FERC issued a decision in June 2012 and held that, while the System Agreement is ambiguous, it does provide authority for individual Utility operating companies to make opportunity sales for their own account and Entergy Arkansas made and priced these sales in good faith.  The FERC found, however, that the System Agreement does not provide authority for an individual Utility operating company to allocate the energy associated with such opportunity sales as part of its load but provides a different allocation authority.  The FERC further found that the after-the-fact accounting methodology used to allocate the energy used to supply the sales was inconsistent with the System Agreement.  The FERC in its decision established further hearing procedures to quantify the effect of repricing the opportunity sales in accordance with the FERC’s June 2012 decision. The hearing was held in May 2013 and the ALJ issued an initial decision in August 2013. The LPSC, the APSC, the City Council, and FERC staff filed briefs on exceptions and/or briefs opposing exceptions. Entergy filed a brief on exceptions requesting that the FERC reverse the initial decision and a brief opposing certain exceptions taken by the LPSC and FERC staff.

In April 2016 the FERC issued orders addressing requests for rehearing filed in July 2012 and the ALJ’s August 2013 initial decision. The first order denied Entergy’s request for rehearing and affirmed the FERC’s earlier rulings that Entergy’s original methodology for allocating energy costs to the opportunity sales was incorrect and, as a result, Entergy Arkansas must make payments to the other Utility operating companies to put them in the same position that they would have been in absent the incorrect allocation. The FERC clarified that interest should be included with the payments. The second order affirmed in part, and reversed in part, the rulings in the ALJ’s August 2013 initial decision regarding the methodology that should be used to calculate the payments Entergy Arkansas is to make to the other Utility operating companies. The FERC affirmed the ALJ’s ruling that a full re-run of intra-system bills should be performed but required that methodology be modified so that the sales have the same priority for purposes of energy allocation as joint account sales. The FERC reversed the ALJ’s decision that any payments by Entergy Arkansas should be reduced by 20%. The FERC also reversed the ALJ’s decision that adjustments to other System Agreement service schedules and excess bandwidth payments should not be taken into account when calculating the payments to be made by Entergy Arkansas. The FERC held that such adjustments and excess bandwidth payments should be taken into account but ordered further proceedings before an ALJ to address whether a cap on any reduction due to bandwidth payments was necessary and to implement the other adjustments to the calculation methodology.

In May 2016, Entergy Services filed a request for rehearing of the FERC’s April 2016 order arguing that payments made by Entergy Arkansas should be reduced as a result of the timing of the LPSC’s approval of certain contracts. Entergy Services also filed a request for clarification and/or rehearing of the FERC’s April 2016 order addressing the ALJ’s August 2013 initial decision. The APSC and the LPSC also filed requests for rehearing of the FERC’s April 2016 order. In September 2017 the FERC issued an order denying the request for rehearing on the issue of whether any payments by Entergy Arkansas to the other Utility operating companies should be reduced due to the timing of the LPSC’s approval of Entergy Arkansas’s wholesale baseload contract with Entergy Louisiana. In November 2017 the FERC issued an order denying all of the remaining requests for rehearing of the April 2016 order. In November 2017, Entergy Services filed a petition for review in the D.C. Circuit of the FERC’s orders in the first two phases of the opportunity sales case. In December 2017 the D.C. Circuit granted Entergy Services’ request to hold the appeal in abeyance pending final resolution of the related proceeding before the FERC. In January 2018 the APSC and the LPSC filed separate petitions for review in the D.C. Circuit, and the D.C. Circuit consolidated the appeals with Entergy Services’ appeal.

The hearing required by the FERC’s April 2016 order was held in May 2017. In July 2017 the ALJ issued an initial decision addressing whether a cap on any reduction due to bandwidth payments was necessary and whether to implement the other adjustments to the calculation methodology. In August 2017 the Utility operating companies, the LPSC, the APSC, and FERC staff filed individual briefs on exceptions challenging various aspects of the initial decision. In September 2017 the Utility operating companies, the LPSC, the APSC, the MPSC, the City Council, and FERC staff filed separate briefs opposing exceptions taken by various parties.
Based on testimony previously submitted in the case and its assessment of the April 2016 FERC orders, in the first quarter 2016, Entergy Arkansas recorded a liability of $87 million, which included interest, for its estimated increased costs and payment to the other Utility operating companies, and a deferred fuel regulatory asset of $75 million. Following its assessment of the course of the proceedings, including the FERC’s denial of rehearing in November 2017 described above, in the fourth quarter 2017, Entergy Arkansas recorded an additional liability of $35 million and a regulatory asset of $31 million.

In October 2018 the FERC issued an order addressing the ALJ’s July 2017 initial decision. The FERC reversed the ALJ’s decision to cap the reduction in Entergy Arkansas’s payment to account for the increased bandwidth payments that Entergy Arkansas made to the other operating companies. The FERC also reversed the ALJ’s decision that Grand Gulf sales from January through September 2000 should be included in the calculation of Entergy Arkansas’s payment. The FERC affirmed on other grounds the ALJ’s rejection of the LPSC’s claim that certain joint account sales should be accounted for as part of the calculation of Entergy Arkansas’s payment. In November 2018 the LPSC requested rehearing of the FERC’s October 2018 decision. In December 2019 the FERC denied the LPSC’s request for rehearing. In January 2020 the LPSC appealed the December 2019 decision to the D.C. Circuit.

In December 2018, Entergy made a compliance filing in response to the FERC’s October 2018 order. The compliance filing provided a final calculation of Entergy Arkansas’s payments to the other Utility operating companies, including interest. No protests were filed in response to the December 2018 compliance filing. The December 2018 compliance filing is pending FERC action. Refunds and interest in the following amounts were paid by Entergy Arkansas to the other operating companies in December 2018:

 Total refunds including interest
Payment/(Receipt)
 (In Millions)
PrincipalInterestTotal
Entergy Arkansas$68$67$135
Entergy Louisiana($30)($29)($59)
Entergy Mississippi($18)($18)($36)
Entergy New Orleans($3)($4)($7)
Entergy Texas($17)($16)($33)

Entergy Arkansas previously recognized a regulatory asset with a balance of $116 million as of December 31, 2018 for a portion of the payments due as a result of this proceeding.

As described above, the FERC’s opportunity sales orders have been appealed to the D.C. Circuit. In February 2020 all of the appeals were consolidated and in April 2020 the D.C. Circuit established a briefing schedule. Briefing was completed in September 2020 and oral argument was heard in December 2020. In July 2021 the D.C. Circuit issued a decision denying all of the petitions for review filed in response to the FERC’s opportunity sales orders.

In February 2019 the LPSC filed a new complaint relating to two issues that were raised in the opportunity sales proceeding, but that, in its October 2018 order, the FERC held were outside the scope of the proceeding. In March 2019, Entergy Services filed an answer and motion to dismiss the new complaint. In November 2019 the FERC issued an order denying the LPSC’s complaint. The order concluded that the settlement agreement approved by the FERC in December 2015 terminating the System Agreement barred the LPSC’s new complaint. In December 2019 the LPSC requested rehearing of the FERC’s November 2019 order, and in July 2020 the FERC issued an order dismissing the LPSC’s request for rehearing. In September 2020 the LPSC appealed to the D.C. Circuit the FERC’s orders dismissing the new opportunity sales complaint. In November 2020 the D.C. Circuit
issued an order establishing that briefing will occur in January 2021 through April 2021. Oral argument was held in September 2021. In December 2021 the D.C. Circuit denied the LPSC’s Petition for Review of the new opportunity sales complaint. The opportunity sales cases are complete at FERC and at the D.C. Circuit and no additional refund amounts are owed by Entergy Arkansas.

In May 2019, Entergy Arkansas filed an application and supporting testimony with the APSC requesting approval of a special rider tariff to recover the costs of these payments from its retail customers over a 24-month period.  The application requested that the APSC approve the rider to take effect within 30 days or, if suspended by the APSC as allowed by commission rule, approve the rider to take effect in the first billing cycle of the first month occurring 30 days after issuance of the APSC’s order approving the rider. In June 2019 the APSC suspended Entergy Arkansas’s tariff and granted Entergy Arkansas’s motion asking the APSC to establish the proceeding as the single designated proceeding in which interested parties may assert claims related to the appropriate retail rate treatment of the FERC’s October 2018 order and related FERC orders in the opportunity sales proceeding. In January 2020 the APSC adopted a procedural schedule with a hearing in April 2020. In January 2020 the Attorney General and Arkansas Electric Energy Consumers, Inc. filed a joint motion seeking to dismiss Entergy Arkansas’s application alleging that the APSC, in a prior proceeding, ruled on the issues addressed in the application and determined that Entergy Arkansas’s requested relief violates the filed rate doctrine and the prohibition against retroactive ratemaking. Entergy Arkansas responded to the joint motion in February 2020 rebutting these arguments, including demonstrating that the claims in this proceeding differ substantially from those the APSC addressed previously and that the payment resulting from a FERC tariff violation for which Entergy Arkansas seeks retail cost recovery in this proceeding differs materially from the refunds resulting from a FERC tariff amendment that the APSC previously rejected on filed rate doctrine and the retroactive ratemaking grounds. In addition, in January 2020 the Attorney General and Arkansas Electric Energy Consumers, Inc. filed testimony opposing the recovery by Entergy Arkansas of the opportunity sales payment but also claiming that certain components of the payment should be segregated and refunded to customers. In March 2020, Entergy Arkansas filed rebuttal testimony.

In July 2020 the APSC issued a decision finding that Entergy Arkansas’s application is not in the public interest. The order also directed Entergy Arkansas to refund to its retail customers within 30 days of the order the FERC-determined over-collection of $13.7 million, plus interest, associated with a recalculated bandwidth remedy. In addition to these primary findings, the order also denied the Attorney General’s request for Entergy Arkansas to prepare a compliance filing detailing all of the retail impacts from the opportunity sales and denied a request by the Arkansas Electric Energy Consumers to recalculate all costs using the revised responsibility ratio. Entergy Arkansas filed a motion for temporary stay of the 30-day requirement to allow Entergy Arkansas a reasonable opportunity to seek rehearing of the APSC order, but in July 2020 the APSC denied Entergy Arkansas’s request for a stay and directed Entergy Arkansas to refund to its retail customers the component of the total FERC-determined opportunity sales payment that was associated with increased bandwidth remedy payments of $13.7 million, plus interest. The refunds were issued in the August 2020 billing cycle. While the APSC denied Entergy Arkansas’s stay request, Entergy Arkansas believes its actions were prudent and, therefore, the costs, including the $13.7 million, plus interest, are recoverable. In July 2020, Entergy Arkansas requested rehearing of the APSC order, which rehearing was denied by the APSC in August 2020. In September 2020, Entergy Arkansas filed a complaint in the U.S. District Court for the Eastern District of Arkansas challenging the APSC’s order denying Entergy Arkansas’s request to recover the costs of these payments. In October 2020 the APSC filed a motion to dismiss Entergy Arkansas’s complaint, to which Entergy Arkansas responded. Also in December 2020, Entergy Arkansas and the APSC held a pre-trial conference, and filed a report with the court in January 2021. The court held a hearing in February 2021 regarding issues addressed in the pre-trial conference report, and in June 2021 the court stayed all discovery until it rules on pending motions, after which the court will issue an amended schedule if necessary.
Complaints Against System Energy

System Energy’s operating revenues are derived from the allocation of the capacity, energy, and related costs associated with its 90% ownership/leasehold interest in Grand Gulf.  System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans pursuant to the Unit Power Sales Agreement. System Energy and the Unit Power Sales Agreement are currently the subject of several litigation proceedings at the FERC, including challenges with respect to System Energy’s authorized return on equity and capital structure, renewal of its sale-leaseback arrangement, treatment of uncertain tax positions, a broader investigation of rates under the Unit Power Sales Agreement, and a prudence complaint challenging the extended power uprate completed at Grand Gulf in 2012 and the operation and management of Grand Gulf, particularly in the 2016-2020 time period. The claims in these proceedings include claims for refunds and claims for rate adjustments; the aggregate amount of refunds claimed in these proceedings substantially exceeds the net book value of System Energy. Following are discussions of the proceedings.

Return on Equity and Capital Structure Complaints

In January 2017 the APSC and MPSC filed a complaint with the FERC against System Energy. The complaint seeks a reduction in the return on equity component of the Unit Power Sales Agreement pursuant to which System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. Entergy Arkansas also sells some of its Grand Gulf capacity and energy to Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under separate agreements. The current return on equity under the Unit Power Sales Agreement is 10.94%, which was established in a rate proceeding that became final in July 2001.

The APSC and MPSC complaint alleges that the return on equity is unjust and unreasonable because capital market and other considerations indicate that it is excessive. The complaint requests proceedings to investigate the return on equity and establish a lower return on equity, and also requests that the FERC establish January 23, 2017 as a refund effective date. The complaint includes return on equity analysis that purports to establish that the range of reasonable return on equity for System Energy is between 8.37% and 8.67%. System Energy answered the complaint in February 2017 and disputes that a return on equity of 8.37% to 8.67% is just and reasonable. The LPSC and the City Council intervened in the proceeding expressing support for the complaint. In September 2017 the FERC established a refund effective date of January 23, 2017 and directed the parties to engage in settlement proceedings before an ALJ. The parties were unable to settle the return on equity issue and a FERC hearing judge was assigned in July 2018. The 15-month refund period in connection with the APSC/MPSC complaint expired on April 23, 2018.

In April 2018 the LPSC filed a complaint with the FERC against System Energy seeking an additional 15-month refund period.  The LPSC complaint requests similar relief from the FERC with respect to System Energy’s return on equity and also requests the FERC to investigate System Energy’s capital structure.  The APSC, MPSC, and City Council intervened in the proceeding, filed an answer expressing support for the complaint, and asked the FERC to consolidate this proceeding with the proceeding initiated by the complaint of the APSC and MPSC in January 2017. System Energy answered the LPSC complaint in May 2018 and also filed a motion to dismiss the complaint. In August 2018 the FERC issued an order dismissing the LPSC’s request to investigate System Energy’s capital structure and setting for hearing the return on equity complaint, with a refund effective date of April 27, 2018. The 15-month refund period in connection with the LPSC return on equity complaint expired on July 26, 2019.

The portion of the LPSC’s complaint dealing with return on equity was subsequently consolidated with the APSC and MPSC complaint for hearing. The parties addressed an order (issued in a separate FERC proceeding involving New England transmission owners) that proposed modifying the FERC’s standard methodology for determining return on equity. In September 2018, System Energy filed a request for rehearing and the LPSC filed a request for rehearing or reconsideration of the FERC’s August 2018 order. The LPSC’s request referenced an
amended complaint that it filed on the same day raising the same capital structure claim the FERC had earlier dismissed. The FERC initiated a new proceeding for the amended capital structure complaint, and System Energy submitted a response in October 2018. In January 2019 the FERC set the amended complaint for settlement and hearing proceedings. Settlement proceedings in the capital structure proceeding commenced in February 2019. As noted below, in June 2019 settlement discussions were terminated and the amended capital structure complaint was consolidated with the ongoing return on equity proceeding. The 15-month refund period in connection with the capital structure complaint was from September 24, 2018 to December 23, 2019.

In January 2019 the LPSC and the APSC and MPSC filed direct testimony in the return on equity proceeding. For the refund period January 23, 2017 through April 23, 2018, the LPSC argues for an authorized return on equity for System Energy of 7.81% and the APSC and MPSC argue for an authorized return on equity for System Energy of 8.24%. For the refund period April 27, 2018 through July 27, 2019, and for application on a prospective basis, the LPSC argues for an authorized return on equity for System Energy of 7.97% and the APSC and MPSC argue for an authorized return on equity for System Energy of 8.41%. In March 2019, System Energy submitted answering testimony. For the first refund period, System Energy’s testimony argues for a return on equity of 10.10% (median) or 10.70% (midpoint). For the second refund period, System Energy’s testimony shows that the calculated returns on equity for the first period fall within the range of presumptively just and reasonable returns on equity, and thus the second complaint should be dismissed (and the first period return on equity used going forward). If the FERC nonetheless were to set a new return on equity for the second period (and going forward), System Energy argues the return on equity should be either 10.32% (median) or 10.69% (midpoint).

In May 2019 the FERC trial staff filed its direct and answering testimony in the return on equity proceeding. For the first refund period, the FERC trial staff calculates an authorized return on equity for System Energy of 9.89% based on the application of FERC’s proposed methodology. The FERC trial staff’s direct and answering testimony noted that an authorized return on equity of 9.89% for the first refund period was within the range of presumptively just and reasonable returns on equity for the second refund period, as calculated using a study period ending January 31, 2019 for the second refund period.

In June 2019, System Energy filed testimony responding to the testimony filed by the FERC trial staff. Among other things, System Energy’s testimony rebutted arguments raised by the FERC trial staff and provided updated calculations for the second refund period based on the study period ending May 31, 2019. For that refund period, System Energy’s testimony shows that strict application of the return on equity methodology proposed by the FERC staff indicates that the second complaint would not be dismissed, and the new return on equity would be set at 9.65% (median) or 9.74% (midpoint). System Energy’s testimony argues that these results are insufficient in light of benchmarks such as state returns on equity and treasury bond yields, and instead proposes that the calculated returns on equity for the second period should be either 9.91% (median) or 10.3% (midpoint). System Energy’s testimony also argues that, under application of its proposed modified methodology, the 10.10% return on equity calculated for the first refund period would fall within the range of presumptively just and reasonable returns on equity for the second refund period.

Also in June 2019, the FERC’s Chief ALJ issued an order terminating settlement discussions in the amended complaint addressing System Energy’s capital structure. The ALJ consolidated the amended capital structure complaint with the ongoing return on equity proceeding and set new procedural deadlines for the consolidated hearing.

In August 2019 the LPSC and the APSC and MPSC filed rebuttal testimony in the return on equity proceeding and direct and answering testimony relating to System Energy’s capital structure. The LPSC re-argues for an authorized return on equity for System Energy of 7.81% for the first refund period and 7.97% for the second refund period. The APSC and MPSC argue for an authorized return on equity for System Energy of 8.26% for the first refund period and 8.32% for the second refund period. With respect to capital structure, the LPSC proposes that the FERC establish a hypothetical capital structure for System Energy for ratemaking purposes. Specifically, the LPSC proposes that System Energy’s common equity ratio be set to Entergy Corporation’s equity ratio of 37%
equity and 63% debt. In the alternative, the LPSC argues that the equity ratio should be no higher than 49%, the composite equity ratio of System Energy and the other Entergy operating companies who purchase under the Unit Power Sales Agreement. The APSC and MPSC recommend that 35.98% be set as the common equity ratio for System Energy. As an alternative, the APSC and MPSC propose that System Energy’s common equity be set at 46.75% based on the median equity ratio of the proxy group for setting the return on equity.

In September 2019 the FERC trial staff filed its rebuttal testimony in the return on equity proceeding. For the first refund period, the FERC trial staff calculates an authorized return on equity for System Energy of 9.40% based on the application of the FERC’s proposed methodology and an updated proxy group. For the second refund period, based on the study period ending May 31, 2019, the FERC trial staff rebuttal testimony argues for a return on equity of 9.63%. In September 2019 the FERC trial staff also filed direct and answering testimony relating to System Energy’s capital structure. The FERC trial staff argues that the average capital structure of the proxy group used to develop System Energy’s return on equity should be used to establish the capital structure. Using this approach, the FERC trial staff calculates the average capital structure for its proposed proxy group of 46.74% common equity, and 53.26% debt.

In October 2019, System Energy filed answering testimony disputing the FERC trial staff’s, the LPSC’s, and the APSC’s and MPSC’s arguments for the use of a hypothetical capital structure and arguing that the use of System Energy’s actual capital structure is just and reasonable.

In November 2019, in a proceeding that did not involve System Energy, the FERC issued an order addressing the methodology for determining the return on equity applicable to transmission owners in MISO. Thereafter, the procedural schedule in the System Energy proceeding was amended to allow the participants to file supplemental testimony addressing the order in the MISO transmission owner proceeding (Opinion No. 569).

In February 2020 the LPSC, the MPSC and APSC, and the FERC trial staff filed supplemental testimony addressing Opinion No. 569 and how it would affect the return on equity evaluation for the two complaint periods concerning System Energy. For the first refund period, based on their respective interpretations and applications of the Opinion No. 569 methodology, the LPSC argues for an authorized return on equity for System Energy of 8.44%; the MPSC and APSC argue for an authorized return on equity of 8.41%; and the FERC trial staff argues for an authorized return on equity of 9.22%. For the second refund period and on a prospective basis, based on their respective interpretations and applications of the Opinion No. 569 methodology, the LPSC argues for an authorized return on equity for System Energy of 7.89%; the MPSC and APSC argue that an authorized return on equity of 8.01% may be appropriate; and the FERC trial staff argues for an authorized return on equity of 8.66%.

In April 2020, System Energy filed supplemental answering testimony addressing Opinion No. 569. System Energy argues that the Opinion No. 569 methodology is conceptually and analytically defective for purposes of establishing just and reasonable authorized return on equity determinations and proposes an alternative approach. As its primary recommendation, System Energy continues to support the return on equity determinations in its March 2019 testimony for the first refund period and its June 2019 testimony for the second refund period. Under the Opinion No. 569 methodology, System Energy calculates a “presumptively just and reasonable range” for the authorized return on equity for the first refund period of 8.57% to 9.52%, and for the second refund period of 8.28% to 9.11%. System Energy argues that these ranges are not just and reasonable results. Under its proposed alternative methodology, System Energy calculates an authorized return on equity of 10.26% for the first refund period, which also falls within the presumptively just and reasonable range calculated for the second refund period and prospectively.

In May 2020 the FERC issued an order on rehearing of Opinion No. 569 (Opinion No. 569-A). In June 2020 the procedural schedule in the System Energy proceeding was further revised in order to allow parties to address the Opinion No. 569-A methodology. Pursuant to the revised schedule, in June 2020, the LPSC, MPSC and APSC, and the FERC trial staff filed supplemental testimony addressing Opinion No. 569-A and how it would affect the return on equity evaluation for the two complaint periods concerning System Energy. For the first refund
period, based on their respective interpretations and applications of the Opinion No. 569-A methodology, the LPSC argues for an authorized return on equity for System Energy of 7.97%; the MPSC and APSC argue for an authorized return on equity of 9.24%; and the FERC trial staff argues for an authorized return on equity of 9.49%. For the second refund period and on a prospective basis, based on their respective interpretations and applications of the Opinion No. 569-A methodology, the LPSC argues for an authorized return on equity for System Energy of 7.78%; the MPSC and APSC argue that an authorized return on equity of 9.15% may be appropriate if the second complaint is not dismissed; and the FERC trial staff argues for an authorized return on equity of 9.09% if the second complaint is not dismissed.

Pursuant to the revised procedural schedule, in July 2020, System Energy filed supplemental testimony addressing Opinion No. 569-A. System Energy argues that strict application of the Opinion No. 569-A methodology produces results inconsistent with investor requirements and does not provide a sound basis on which to evaluate System Energy’s authorized return on equity. As its primary recommendation, System Energy argues for the use of a methodology that incorporates four separate financial models, including the constant growth form of the discounted cash flow model and the empirical capital asset pricing model. Based on application of its recommended methodology, System Energy argues for an authorized return on equity of 10.12% for the first refund period, which also falls within the presumptively just and reasonable range calculated for the second refund period and prospectively. Under the Opinion No. 569-A methodology, System Energy calculates an authorized return on equity of 9.44% for the first refund period, which also falls within the presumptively just and reasonable range calculated for the second refund period and prospectively.

The parties and FERC trial staff filed final rounds of testimony in August 2020. The hearing before a FERC ALJ occurred in late-September through early-October 2020, post-hearing briefing took place in November and December 2020.

In March 2021 the FERC ALJ issued an initial decision. With regard to System Energy’s authorized return on equity, the ALJ determined that the existing return on equity of 10.94% is no longer just and reasonable, and that the replacement authorized return on equity, based on application of the Opinion No. 569-A methodology, should be 9.32%. The ALJ further determined that System Energy should pay refunds for a fifteen-month refund period (January 2017-April 2018) based on the difference between the current return on equity and the replacement authorized return on equity. The ALJ determined that the April 2018 complaint concerning the authorized return on equity should be dismissed, and that no refunds for a second fifteen-month refund period should be due. With regard to System Energy’s capital structure, the ALJ determined that System Energy’s actual equity ratio is excessive and that the just and reasonable equity ratio is 48.15% equity, based on the average equity ratio of the proxy group used to evaluate the return on equity for the second complaint. The ALJ further determined that System Energy should pay refunds for a fifteen-month refund period (September 2018-December 2019) based on the difference between the actual equity ratio and the 48.15% equity ratio. If the ALJ’s initial decision is upheld, the estimated refund for this proceeding is approximately $60 million, which includes interest through December 31, 2021, and the estimated resulting annual rate reduction would be approximately $45 million. The estimated refund will continue to accrue interest until a final FERC decision is issued. Based on the course of the proceeding to date, System Energy has recorded a provision of $37 million, including interest, as of December 31, 2021.

The ALJ initial decision is an interim step in the FERC litigation process, and an ALJ’s determinations made in an initial decision are not controlling on the FERC. In April 2021, System Energy filed its brief on exceptions, in which it challenged the initial decision’s findings on both the return on equity and capital structure issues. Also in April 2021 the LPSC, APSC, MPSC, City Council, and the FERC trial staff filed briefs on exceptions. Reply briefs opposing exceptions were filed in May 2021 by System Energy, the FERC trial staff, the LPSC, APSC, MPSC, and the City Council. Refunds, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.
Grand Gulf Sale-leaseback Renewal Complaint and Uncertain Tax Position Rate Base Issue

In May 2018 the LPSC filed a complaint against System Energy and Entergy Services related to System Energy’s renewal of a sale-leaseback transaction originally entered into in December 1988 for an 11.5% undivided interest in Grand Gulf Unit 1. The complaint alleges that System Energy violated the filed rate and the FERC’s ratemaking and accounting requirements when it included in Unit Power Sales Agreement billings the cost of capital additions associated with the sale-leaseback interest, and that System Energy is double-recovering costs by including both the lease payments and the capital additions in Unit Power Sales Agreement billings. The complaint also claims that System Energy was imprudent in entering into the sale-leaseback renewal because the Utility operating companies that purchase Grand Gulf’s output from System Energy could have obtained cheaper capacity and energy in the MISO markets. The complaint further alleges that System Energy violated various other reporting and accounting requirements and should have sought prior FERC approval of the lease renewal. The complaint seeks various forms of relief from the FERC. The complaint seeks refunds for capital addition costs for all years in which they were recorded in allegedly non-formula accounts or, alternatively, the disallowance of the return on equity for the capital additions in those years plus interest. The complaint also asks that the FERC disallow and refund the lease costs of the sale-leaseback renewal on grounds of imprudence, investigate System Energy’s treatment of a DOE litigation payment, and impose certain forward-looking procedural protections, including audit rights for retail regulators of the Unit Power Sales Agreement formula rates. The APSC, MPSC, and City Council intervened in the proceeding.

In June 2018, System Energy and Entergy Services filed a motion to dismiss and an answer to the LPSC complaint denying that System Energy’s treatment of the sale-leaseback renewal and capital additions violated the terms of the filed rate or any other FERC ratemaking, accounting, or legal requirements or otherwise constituted double recovery. The response also argued that the complaint is inconsistent with a FERC-approved settlement to which the LPSC is a party and that explicitly authorizes System Energy to recover its lease payments. Finally, the response argued that both the capital additions and the sale-leaseback renewal were prudent investments and the LPSC complaint fails to justify any disallowance or refunds. The response also offered to submit formula rate protocols for the Unit Power Sales Agreement similar to the procedures used for reviewing transmission rates under the MISO tariff. In September 2018 the FERC issued an order setting the complaint for hearing and settlement proceedings. The FERC established a refund effective date of May 18, 2018.

In February 2019 the presiding ALJ ruled that the hearing ordered by the FERC includes the issue of whether specific subcategories of accumulated deferred income tax should be included in, or excluded from, System Energy’s formula rate. In March 2019 the LPSC, MPSC, APSC and City Council filed direct testimony. The LPSC testimony sought refunds that include the renewal lease payments (approximately $17.2 million per year since July 2015), rate base reductions for accumulated deferred income tax associated with uncertain tax positions, and the cost of capital additions associated with the sale-leaseback interest, as well as interest on those amounts.

In June 2019 System Energy filed answering testimony arguing that the FERC should reject all claims for refunds.  Among other things, System Energy argued that claims for refunds of the costs of lease renewal payments and capital additions should be rejected because those costs were recovered consistent with the Unit Power Sales Agreement formula rate, System Energy was not over or double recovering any costs, and ratepayers will save costs over the initial and renewal terms of the leases.  System Energy argued that claims for refunds associated with liabilities arising from uncertain tax positions should be rejected because the liabilities do not provide cost-free capital, the repayment timing of the liabilities is uncertain, and the outcome of the underlying tax positions is uncertain.  System Energy’s testimony also challenged the refund calculations supplied by the other parties.

In August 2019 the FERC trial staff filed direct and answering testimony seeking refunds for rate base reductions for liabilities associated with uncertain tax positions. The FERC trial staff also argued that System Energy recovered $32 million more than it should have in depreciation expense for capital additions. In September 2019, System Energy filed cross-answering testimony disputing the FERC trial staff’s arguments for refunds, stating that the FERC trial staff’s position regarding depreciation rates for capital additions is not unreasonable, but
explaining that any change in depreciation expense is only one element of a Unit Power Sales Agreement re-billing calculation. Adjustments to depreciation expense in any re-billing under the Unit Power Sales Agreement formula rate will also involve changes to accumulated depreciation, accumulated deferred income taxes, and other formula elements as needed. In October 2019 the LPSC filed rebuttal testimony increasing the amount of refunds sought for liabilities associated with uncertain tax positions.  The LPSC seeks approximately $512 million plus interest, which is approximately $216 million through December 31, 2021.  The FERC trial staff also filed rebuttal testimony in which it seeks refunds of a similar amount as the LPSC for the liabilities associated with uncertain tax positions.  The LPSC testimony also argued that adjustments to depreciation rates should affect rate base on a prospective basis only.

A hearing was held before a FERC ALJ in November 2019. In April 2020 the ALJ issued the initial decision. Among other things, the ALJ determined that refunds were due on three main issues. First, with regard to the lease renewal payments, the ALJ determined that System Energy is recovering an unjust acquisition premium through the lease renewal payments, and that System Energy’s recovery from customers through rates should be limited to the cost of service based on the remaining net book value of the leased assets, which is approximately $70 million. The ALJ found that the remedy for this issue should be the refund of lease payments (approximately $17.2 million per year since July 2015) with interest determined at the FERC quarterly interest rate, which would be offset by the addition of the net book value of the leased assets in the cost of service. The ALJ did not calculate a value for the refund expected as a result of this remedy. In addition, System Energy would no longer recover the lease payments in rates prospectively. Second, with regard to the liabilities associated with uncertain tax positions, the ALJ determined that the liabilities are accumulated deferred income taxes and that System Energy’s rate base should have been reduced for those liabilities. If the ALJ’s initial decision is upheld, the estimated refund for this issue through December 31, 2021, is approximately $422 million, plus interest, which is approximately $128 million through December 31, 2021. The ALJ also found that System Energy should include liabilities associated with uncertain tax positions as a rate base reduction going forward. Third, with regard to the depreciation expense adjustments, the ALJ found that System Energy should correct for the error in re-billings retroactively and prospectively, but that System Energy should not be permitted to recover interest on any retroactive return on enhanced rate base resulting from such corrections. If the initial decision is affirmed on this issue, System Energy estimates refunds of approximately $19 million, which includes interest through December 31, 2021.

The ALJ initial decision is an interim step in the FERC litigation process, and an ALJ’s determinations made in an initial decision are not controlling on the FERC. The ALJ in the initial decision acknowledges that these are issues of first impression before the FERC. In June 2020, System Energy, the LPSC, and the FERC trial staff filed briefs on exceptions, challenging several of the initial decision’s findings. System Energy’s brief on exceptions challenged the initial decision’s limitations on recovery of the lease renewal payments, its proposed rate base refund for the liabilities associated with uncertain tax positions, and its proposal to asymmetrically treat interest on bill corrections for depreciation expense adjustments. The LPSC’s and the FERC trial staff’s briefs on exceptions each challenged the initial decision’s allowance for recovery of the cost of service associated with the lease renewal based on the remaining net book value of the leased assets, its calculation of the remaining net book value of the leased assets, and the amount of the initial decision’s proposed rate base refund for the liabilities associated with uncertain tax positions. The LPSC’s brief on exceptions also challenged the initial decision’s proposal that depreciation expense adjustments include retroactive adjustments to rate base and its finding that section 203 of the Federal Power Act did not apply to the lease renewal. The FERC trial staff’s brief on exceptions also challenged the initial decision’s finding that the FERC need not institute a formal investigation into System Energy’s tariff. In October 2020, System Energy, the LPSC, the MPSC, the APSC, and the City Council filed briefs opposing exceptions. System Energy opposed the exceptions filed by the LPSC and the FERC trial staff. The LPSC, MPSC, APSC, City Council, and the FERC trial staff opposed the exceptions filed by System Energy. Also in October 2020 the MPSC, APSC, and the City Council filed briefs adopting the exceptions of the LPSC and the FERC trial staff. The case is pending before the FERC, which will review the case and issue an order on the proceeding, and the FERC may accept, reject, or modify the ALJ’s initial decision in whole or in part. Refunds, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.
In addition, in September 2020, the IRS issued a Notice of Proposed Adjustment (NOPA) and Entergy executed it. The NOPA memorializes the IRS’s decision to adjust the 2015 consolidated federal income tax return of Entergy Corporation and certain of its subsidiaries, including System Energy, with regard to the uncertain decommissioning tax position. Pursuant to the audit resolution documented in the NOPA, the IRS allowed System Energy’s inclusion of $102 million of future nuclear decommissioning costs in System Energy’s cost of goods sold for the 2015 tax year, roughly 10% of the requested deduction, but disallowed the balance of the position. In September 2020, System Energy filed a motion to lodge the NOPA into the record in the FERC proceeding. In October 2020 the LPSC, the APSC, the MPSC, the City Council, and the FERC trial staff filed oppositions to System Energy’s motion. As a result of the NOPA issued by the IRS in September 2020, System Energy filed, in October 2020, a new Federal Power Act section 205 filing at FERC to establish an ongoing rate base credit for the accumulated deferred income taxes resulting from the decommissioning uncertain tax position. On a prospective basis beginning with the October 2020 bill, System Energy proposes to include the accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position as a credit to rate base under the Unit Power Sales Agreement. In November 2020 the LPSC, APSC, MPSC, and City Council filed a protest to the filing, and System Energy responded.

In November 2020 the IRS issued a Revenue Agent’s Report (RAR) for the 2014/2015 tax year and in December 2020 Entergy executed it. The RAR contained the same adjustment to the uncertain nuclear decommissioning tax position as that which the IRS had announced in the NOPA. In December 2020, System Energy filed a motion to lodge the RAR into the record in the FERC proceeding addressing the uncertain tax position rate base issue. In January 2021 the LPSC, APSC, MPSC, and City Council filed a protest to the motion.

As a result of the RAR, in December 2020, System Energy filed amendments to its new Federal Power Act section 205 filings to establish an ongoing rate base credit for the accumulated deferred income taxes resulting from the decommissioning uncertain tax position and to credit excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position. The amendments both propose the inclusion of the RAR as support for the filings. In December 2020 the LPSC, APSC, and City Council filed a protest in response to the amendments, reiterating their prior objections to the filings. In February 2021 the FERC issued an order accepting System Energy’s Federal Power Act section 205 filings subject to refund, setting them for hearing, and holding the hearing in abeyance.

In December 2020, System Energy filed a new Federal Power Act section 205 filing to provide a one-time, historical credit of $25.2 million for the accumulated deferred income taxes that would have been created by the decommissioning uncertain tax position if the IRS’s decision had been known in 2016. In January 2021 the LPSC, APSC, MPSC, and City Council filed a protest to the filing. In February 2021 the FERC issued an order accepting System Energy’s Federal Power Act section 205 filing subject to refund, setting it for hearing, and holding the hearing in abeyance. The one-time credit was made during the first quarter 2021.

LPSC Authorization of Additional Complaints

In May 2020 the LPSC authorized its staff to file additional complaints at the FERC related to the rates charged by System Energy for Grand Gulf energy and capacity supplied to Entergy Louisiana under the Unit Power Sales Agreement. The LPSC directive notes that the initial decision issued by the presiding ALJ in the Grand Gulf sale-leaseback complaint proceeding did not address, for procedural reasons, certain rate issues raised by the LPSC and declined to order further investigation of rates charged by System Energy. The LPSC directive authorizes its staff to file complaints at the FERC “necessary to address these rate issues, to request a full investigation into the rates charged by System Energy for Grand Gulf power, and to seek rate refund, rate reduction, and such other remedies as may be necessary and appropriate to protect Louisiana ratepayers.” The LPSC directive further stated that the LPSC has seen “information suggesting that the Grand Gulf plant has been significantly underperforming compared to other nuclear plants in the United States, has had several extended and unexplained outages, and has been plagued with serious safety concerns.” The LPSC expressed concern that the costs paid by Entergy
Louisiana's retail customers may have been detrimentally impacted, and authorized “the filing of a FERC complaint to address these performance issues and to seek appropriate refund, rate reduction, and other remedies as may be appropriate.”

Unit Power Sales Agreement Complaint

The first of the additional complaints was filed by the LPSC, the APSC, the MPSC, and the City Council in September 2020. The complaint raises two sets of rate allegations: violations of the filed rate and a corresponding request for refunds for prior periods; and elements of the Unit Power Sales Agreement are unjust and unreasonable and a corresponding request for refunds for the 15-month refund period and changes to the Unit Power Sales Agreement prospectively. Several of the filed rate allegations overlap with the previous complaints. The filed rate allegations not previously raised are that System Energy: failed to provide a rate base credit to customers for the “time value” of sale-leaseback lease payments collected from customers in advance of the time those payments were due to the owner-lessors; improperly included certain lease refinancing costs in rate base as prepayments; improperly included nuclear decommissioning outage costs in rate base; failed to include categories of accumulated deferred income taxes as a reduction to rate base; charged customers based on a higher equity ratio than would be appropriate due to excessive retained earnings; and did not correctly reflect money pool investments and imprudently invested cash into the money pool. The elements of the Unit Power Sales Agreement that the complaint alleges are unjust and unreasonable include: incentive and executive compensation, lack of an equity re-opener, lobbying, and private airplane travel. The complaint also requests a rate investigation into the Unit Power Sales Agreement and System Energy’s billing practices pursuant to section 206 of the Federal Power Act, including any issue relevant to the Unit Power Sales Agreement and its inputs. System Energy filed its answer opposing the complaint in November 2020. In its answer, System Energy argued that all of the claims raised in the complaint should be dismissed and agreed that bill adjustment with respect to two discrete issues were justified. System Energy argued that dismissal is warranted because all claims fall into one or more of the following categories: the claims have been raised and are being litigated in another proceeding; the claims do not present a prima facie case and do not satisfy the threshold burden to establish a complaint proceeding; the claims are premised on a theory or request relief that is incompatible with federal law or FERC policy; the claims request relief that is inconsistent with the filed rate; the claims are barred or waived by the legal doctrine of laches; and/or the claims have been fully addressed and do not warrant further litigation. In December 2020, System Energy filed a bill adjustment report indicating that $3.4 million had been credited to customers in connection with the two discrete issues concerning the inclusion of certain accumulated deferred income taxes balances in rates. In January 2021 the complainants filed a response to System Energy’s November 2020 answer, and in February 2021, System Energy filed a response to the complainant’s response.

In May 2021 the FERC issued an order addressing the complaint, establishing a refund effective date of September 21, 2020, establishing hearing procedures, and holding those procedures in abeyance pending FERC’s review of the initial decision in the Grand Gulf sale-leaseback renewal complaint discussed above. System Energy agreed that the hearing should be held in abeyance but sought rehearing of FERC’s decision as related to matters set for hearing that were beyond the scope of FERC’s jurisdiction or authority. The complainants sought rehearing of FERC’s decision to hold the hearing in abeyance and filed a motion to proceed, which motion System Energy subsequently opposed. In June 2021, System Energy’s request for rehearing was denied by operation of law, and System Energy filed an appeal of FERC’s orders in the Court of Appeals for the Fifth Circuit. The appeal was initially stayed for a period of 90 days, but the stay expired. In November 2021 the Fifth Circuit dismissed the appeal as premature.

In August 2021 the FERC issued an order addressing System Energy’s and the complainants’ rehearing requests. The FERC dismissed part of the complaint seeking an equity re-opener, maintained the abeyance for issues related to the proceeding addressing the sale-leaseback renewal and uncertain tax positions, lifted the abeyance for issues unrelated to that proceeding, and clarified the scope of the hearing. A procedural schedule was established, with the hearing scheduled for June 2022 and the ALJ’s initial decision scheduled for November 2022. Discovery is ongoing.
In November 2021 the LPSC, APSC, and City Council filed direct testimony and requested the FERC to order refunds for prior periods and prospective amendments to the Unit Power Sales Agreement. The LPSC’s refund claims include, among other things, allegations that: (1) System Energy should not have included certain sale-leaseback transaction costs in prepayments; (2) System Energy should have credited rate base to reflect the time value of money associated with the advance collection of lease payments; (3) System Energy incorrectly included refueling outage costs that were recorded in account 174 in rate base; and (4) System Energy should have excluded several accumulated deferred income tax balances in account 190 from rate base. The LPSC is also seeking a retroactive adjustment to retained earnings and capital structure in conjunction with the implementation of its proposed refunds. In addition, the LPSC seeks amendments to the Unit Power Sales Agreement going forward to address below-the-line costs, incentive compensation, the working capital allowance, litigation expenses, and the 2019 termination of the capital funds agreement. The APSC argues that: (1) System Energy should have included borrowings from the Entergy System money pool in its determination of short-term debt in its cost of capital; and (2) System Energy should credit customers with System Energy’s allocation of earnings on money pool investments. The City Council alleges that System Energy has maintained excess cash on hand in the money pool and that retention of excess cash was imprudent. Based on this allegation, the City Council’s witness recommends a refund of approximately $98.8 million for the period 2004-September 2021 or other alternative relief. The City Council further recommends that the FERC impose a hypothetical equity ratio such as 48.15% equity to capital on a prospective basis.

In January 2022, System Energy filed answering testimony arguing that the FERC should not order refunds for prior periods or any prospective amendments to the Unit Power Sales Agreement. In response to the LPSC’s refund claims, System Energy argues, among other things, that (1) the inclusion of sale-leaseback transaction costs in prepayments was correct; (2) that the filed rate doctrine bars the request for a retroactive credit to rate base for the time value of money associated with the advance collection of lease payments; (3) that an accounting misclassification for deferred refueling outage costs has been corrected, caused no harm to customers, and requires no refunds; and (4) that its accounting and ratemaking treatment of specified accumulated deferred income tax balances in account 190 has been correct. System Energy further responds that no retroactive adjustment to retained earnings or capital structure should be ordered because there is no general policy requiring such a remedy and there was no showing that the retained earnings element of the capital structure was incorrectly implemented. Further, System Energy presented evidence that all of the costs that are being challenged were long known to the retail regulators and were approved by them for inclusion in retail rates, and the attempt to retroactively challenge these costs, some of which have been included in rates for decades, is unjust and unreasonable. In response to the LPSC’s proposed going-forward adjustments, System Energy presents evidence to show that none of the proposed adjustments are needed. On the issue of below-the-line expenses, during discovery procedures System Energy identified a historical allocation error in certain months and agreed to provide a bill credit to customers to correct the error. In response to the APSC’s claims, System Energy argues that the Unit Power Sales Agreement does not include System Energy’s borrowings from the Entergy System money pool or earnings on deposits to the Entergy System money pool in the determination of the cost of capital; and accordingly, no refunds are appropriate on those issues. In response to the City Council’s claims, System Energy argues that it has reasonably managed its cash and that the City Council’s theory of cash management is defective because it fails to adequately consider the relevant cash needs of System Energy and it makes faulty presumptions about the operation of the Entergy System money pool. System Energy further points out that the issue of its capital structure is already subject to pending FERC litigation.

Grand Gulf Prudence Complaint

The second of the additional complaints was filed at the FERC in March 2021 by the LPSC, the APSC, and the City Council against System Energy, Entergy Services, Entergy Operations, and Entergy Corporation. The second complaint contains two primary allegations. First, it alleges that, based on the plant’s capacity factor and alleged safety performance, System Energy and the other respondents imprudently operated Grand Gulf during the period 2016-2020, and it seeks refunds of at least $360 million in alleged replacement energy costs, in addition to other costs, including those that can only be identified upon further investigation. Second, it alleges that the
performance and/or management of the 2012 extended power uprate of Grand Gulf was imprudent, and it seeks refunds of all costs of the 2012 uprate that are determined to result from imprudent planning or management of the project. In addition to the requested refunds, the complaint asks that the FERC modify the Unit Power Sales Agreement to provide for full cost recovery only if certain performance indicators are met and to require pre-authorization of capital improvement projects in excess of $125 million before related costs may be passed through to customers in rates. In April 2021, System Energy and the other respondents filed their motion to dismiss and answer to the complaint. System Energy requested that the FERC dismiss the claims within the complaint. With respect to the claim concerning operations, System Energy argues that the complaint does not meet its legal burden because, among other reasons, it fails to allege any specific imprudent conduct. With respect to the claim concerning the uprate, System Energy argues that the complaint fails because, among other reasons, the complainants’ own conduct prevents them from raising a serious doubt as to the prudence of the uprate. System Energy also requests that the FERC dismiss other elements of the complaint, including the proposed modifications to the Unit Power Sales Agreement, because they are not warranted. Additional responsive pleadings were filed by the complainants and System Energy during the period from March through July 2021. The pleadings are pending FERC action.
Storm Cost Recovery Filings with Retail Regulators

Entergy Louisiana

Hurricane Laura, Hurricane Delta, Hurricane Zeta, Winter Storm Uri, and Hurricane Ida

In August 2020 and October 2020, Hurricane Laura, Hurricane Delta, and Hurricane Zeta caused significant damage to portions of Entergy Louisiana’s service area. The storms resulted in widespread outages, significant damage to distribution and transmission infrastructure, and the loss of sales during the outages. Additionally, as a result of Hurricane Laura’s extensive damage to the grid infrastructure serving the impacted area, large portions of the underlying transmission system required nearly a complete rebuild.

In October 2020, Entergy Louisiana filed an application at the LPSC seeking approval of certain ratemaking adjustments in connection with the issuance of shorter-term mortgage bonds to provide interim financing for restoration costs associated with Hurricane Laura, Hurricane Delta, and Hurricane Zeta. Subsequently, Entergy Louisiana and the LPSC staff filed a joint motion seeking approval to exclude from the derivation of Entergy Louisiana’s capital structure and cost rate of debt for ratemaking purposes, including the allowance for funds used during construction, shorter-term debt up to $1.1 billion issued by Entergy Louisiana to fund costs associated with Hurricane Laura, Hurricane Delta, and Hurricane Zeta costs on an interim basis. In November 2020 the LPSC issued an order approving the joint motion, and Entergy Louisiana issued $1.1 billion of 0.62% Series mortgage bonds due November 2023. Also in November 2020, Entergy Louisiana withdrew $257 million from its funded storm reserves.

In February 2021 two winter storms (collectively, Winter Storm Uri) brought freezing rain and ice to Louisiana. Ice accumulation sagged or downed trees, limbs and power lines, causing damage to Entergy Louisiana’s transmission and distribution systems. The additional weight of ice caused trees and limbs to fall into power lines and other electric equipment. When the ice melted, it affected vegetation and electrical equipment, causing additional outages. As discussed above in “Fuel and purchased power recovery,” Entergy Louisiana recovered the incremental fuel costs associated with Winter Storm Uri over a five-month period from April 2021 through August 2021.

In April 2021, Entergy Louisiana filed an application with the LPSC relating to Hurricane Laura, Hurricane Delta, Hurricane Zeta, and Winter Storm Uri restoration costs and in July 2021, Entergy Louisiana made a supplemental filing updating the total restoration costs. Total restoration costs for the repair and/or replacement of Entergy Louisiana’s electric facilities damaged by these storms are currently estimated to be approximately $2.06 billion, including approximately $1.68 billion in capital costs and approximately $380 million in non-capital
costs. Including carrying costs through January 2022, Entergy Louisiana is seeking an LPSC determination that $2.11 billion was prudently incurred and, therefore, is eligible for recovery from customers. Additionally, Entergy Louisiana is requesting that the LPSC determine that re-establishment of a storm escrow account to the previously authorized amount of $290 million is appropriate. In July 2021, Entergy Louisiana supplemented the application with a request regarding the financing and recovery of the recoverable storm restoration costs. Specifically, Entergy Louisiana requested approval to securitize its restoration costs pursuant to Louisiana Act 55 financing, as supplemented by Act 293 of the Louisiana Legislature’s Regular Session of 2021. As previously discussed, in August 2021, Hurricane Ida caused extensive damage to Entergy Louisiana’s distribution and, to a lesser extent, transmission systems resulting in widespread power outages. In September 2021, Entergy Louisiana supplemented the application with a request to establish and securitize a $1 billion restricted storm escrow account for Hurricane Ida related restoration costs, subject to a subsequent prudence review. In total, Entergy Louisiana requested authorization for the issuance of system restoration bonds in one or more series in an aggregate principal amount of $3.18 billion, which includes the costs of re-establishing and funding a storm damage escrow account, carrying costs and unamortized debt costs on interim financing, and issuance costs. After filing of testimony by LPSC staff and intervenors, which generally supported or did not oppose Entergy Louisiana’s requests, the parties negotiated and executed an uncontested stipulated settlement which was filed with the LPSC in February 2022. The settlement agreement contains the following key terms: $2.1 billion of restoration costs from Hurricane Laura, Hurricane Delta, Hurricane Zeta, and Winter Storm Uri were prudently incurred and are eligible for recovery; carrying costs of $51 million are recoverable; a $290 million cash storm reserve should be re-established; a $1 billion reserve should be established to partially pay for Hurricane Ida restoration costs; and Entergy Louisiana is authorized to finance $3.186 billion utilizing the securitization process authorized by Act 55, as supplemented by Act 293. The LPSC voted to approve the settlement at its February 2022 meeting.

Hurricane Isaac

In August 2012, Hurricane Isaac caused extensive damage to Entergy Louisiana’s service area.  In June 2014 the LPSC authorized Entergy Louisiana to utilize Louisiana Act 55 financing for Hurricane Isaac system restoration costs.  Entergy Louisiana committed to pass on to customers a minimum of $30.8 million of customer benefits through annual customer credits of approximately $6.2 million for five years. Approvals for the Act 55 financings were obtained from the Louisiana Utilities Restoration Corporation (LURC) and the Louisiana State Bond Commission.

In August 2014 the Louisiana Local Government Environmental Facilities and Community Development Authority (LCDA) issued $314.85 million in bonds under Louisiana Act 55.  From the $309 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $16 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $293 million directly to Entergy Louisiana.  Entergy Louisiana used the $293 million received from the LURC to acquire 2,935,152.69 Class C preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 7.5% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2014, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement. The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1.75 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

In the first quarter 2020, Entergy and the IRS agreed upon and settled on the treatment of funds received by Entergy Louisiana in conjunction with the Act 55 financing of Hurricane Isaac storm costs, which resulted in a net reduction of income tax expense of approximately $32 million. As a result of the settlement, the position was
partially sustained and Entergy Louisiana recorded a reduction of income tax expense of approximately $58 million primarily due to the reversal of liabilities for uncertain tax positions in excess of the agreed-upon settlement. Entergy recorded an increase to income tax expense of $26 million primarily resulting from the reduction of the deferred tax asset, associated with utilization of the net operating loss as a result of the settlement. This adjustment recorded by Entergy also accounted for the tax rate change of the Tax Cuts and Jobs Act. As a result of the IRS settlement, Entergy Louisiana recorded a $29 million ($21 million net-of-tax) regulatory charge and a corresponding regulatory liability to reflect its obligation to customers pursuant to the LPSC Hurricane Isaac Act 55 financing order.

Hurricane Gustav and Hurricane Ike

In September 2008, Hurricane Gustav and Hurricane Ike caused catastrophic damage to Entergy Louisiana’s service territory.  In December 2009, Entergy Louisiana entered into a stipulation agreement with the LPSC staff regarding its storm costs.  In March and April 2010, Entergy Louisiana and other parties to the proceeding filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal to utilize Act 55 financing, which included a commitment to pass on to customers a minimum of $43.3 million of customer benefits through a prospective annual rate reduction of $8.7 million for five years.  In April 2010 the LPSC approved the settlement and subsequently issued financing orders and a ratemaking order intended to facilitate the implementation of the Act 55 financings.  In June 2010 the Louisiana State Bond Commission approved the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricane Gustav and Hurricane Ike was reduced by $2.7 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2010 the LCDA issued two series of bonds totaling $713.0 million under Act 55.  From the $702.7 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $290 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $412.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana used $412.7 million to acquire 4,126,940.15 Class B preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 9% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2010, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA, and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

Hurricane Katrina and Hurricane Rita

In August and September 2005, Hurricanes Katrina and Rita caused catastrophic damage to Entergy Louisiana’s service territory. In March 2008, Entergy Louisiana and the LURC filed at the LPSC an application requesting that the LPSC grant a financing order authorizing the financing of Entergy Louisiana storm costs, storm reserves, and issuance costs pursuant to Louisiana Act 55.  Entergy Louisiana also filed an application requesting LPSC approval for ancillary issues including the mechanism to flow charges and savings to customers via a storm cost offset rider.  In April 2008 the Louisiana Public Facilities Authority (LPFA), which is the issuer of the bonds
pursuant to the Act 55 financing, approved requests for the Act 55 financing.  Also in April 2008, Entergy Louisiana and the LPSC staff filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal under the Act 55 financing, which included a commitment to pass on to customers a minimum of $40 million of customer benefits through a prospective annual rate reduction of $8 million for five years.  The LPSC subsequently approved the settlement and issued two financing orders and one ratemaking order intended to facilitate implementation of the Act 55 financing.  In May 2008 the Louisiana State Bond Commission granted final approval of the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricanes Katrina and Rita was reduced by $22.3 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2008 the LPFA issued $687.7 million in bonds under the aforementioned Act 55.  From the $679 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $152 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $527 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $545 million, including $17.8 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 5,449,861.85 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 10% annual distribution rate.  In August 2008 the LPFA issued $278.4 million in bonds under the aforementioned Act 55.  From the $274.7 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $87 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $187.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $189.4 million, including $1.7 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 1,893,918.39 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC that carry a 10% annual distribution rate.  Distributions are payable quarterly commencing on September 15, 2008 and have a liquidation price of $100 per unit.  The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.  

The bonds were repaid in 2018. Entergy and Entergy Louisiana did not report the bonds issued by the LPFA on their balance sheets because the bonds are the obligation of the LPFA, and there was no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collected a system restoration charge on behalf of the LURC and remitted the collections to the bond indenture trustee.  Entergy and Entergy Louisiana did not report the collections as revenue because Entergy Louisiana was merely acting as the billing and collection agent for the state.

Entergy Mississippi

Entergy Mississippi has approval from the MPSC to collect a storm damage provision of $1.75 million per month. If Entergy Mississippi’s accumulated storm damage provision balance exceeds $15 million, the collection of the storm damage provision ceases until such time that the accumulated storm damage provision becomes less than $10 million. Entergy Mississippi’s storm damage provision balance has been less than $10 million since May 2019, and Entergy Mississippi has been billing the monthly storm damage provision since July 2019.
Entergy New Orleans

Hurricane Zeta

In October 2020, Hurricane Zeta caused significant damage to Entergy New Orleans’s service area. The storm resulted in widespread power outages, significant damage to distribution and transmission infrastructure, and the loss of sales during the power outages. In March 2021, Entergy New Orleans withdrew $44 million from its funded storm reserves. In May 2021, Entergy New Orleans filed an application with the City Council requesting approval and certification that its system restoration costs associated with Hurricane Zeta of approximately $36 million, including approximately $28 million in capital costs and approximately $8 million in non-capital costs, were reasonable and necessary to enable Entergy New Orleans to restore electric service to its customers and Entergy New Orleans’s electric utility infrastructure.

Entergy Texas

Hurricane Laura, Hurricane Delta, and Winter Storm Uri

In August 2020 and October 2020, Hurricane Laura and Hurricane Delta caused extensive damage to Entergy Texas’s service area. In February 2021, Winter Storm Uri also caused damage to Entergy Texas’s service area. The storms resulted in widespread power outages, significant damage primarily to distribution and transmission infrastructure, and the loss of sales during the power outages. In April 2021, Entergy Texas filed an application with the PUCT requesting a determination that approximately $250 million of system restoration costs associated with Hurricane Laura, Hurricane Delta, and Winter Storm Uri, including approximately $200 million in capital costs and approximately $50 million in non-capital costs, were reasonable and necessary to enable Entergy Texas to restore electric service to its customers and Entergy Texas’s electric utility infrastructure. The filing also included the projected balance of approximately $13 million of a regulatory asset containing previously approved system restoration costs related to Hurricane Harvey. In September 2021 the parties filed an unopposed settlement agreement, pursuant to which Entergy Texas removed from the amount to be securitized approximately $4.3 million that will instead be charged to its storm reserve, $5 million related to no particular issue, of which Entergy Texas would be permitted to seek recovery in a future proceeding, and approximately $300 thousand related to attestation costs. In December 2021 the PUCT issued an order approving the unopposed settlement and determining system restoration costs of $243 million related to Hurricane Laura, Hurricane Delta, and Winter Storm Uri and the $13 million projected remaining balance of the Hurricane Harvey system restoration costs were eligible for securitization. The order also determines that Entergy Texas can recover carrying costs on the system restoration costs related to Hurricane Laura, Hurricane Delta, and Winter Storm Uri.

In July 2021, Entergy Texas filed with the PUCT an application for a financing order to approve the securitization of the system restoration costs that are the subject of the April 2021 application. In November 2021 the parties filed an unopposed settlement agreement supporting the issuance of a financing order consistent with Entergy Texas’s application and with minor adjustments to certain upfront and ongoing costs to be incurred to facilitate the issuance and serving of system restoration bonds. In January 2022 the PUCT issued a financing order consistent with the unopposed settlement.
System Energy [Member]  
Rate And Regulatory Matters RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)
Regulatory Assets and Regulatory Liabilities

Regulatory assets represent probable future revenues associated with costs that Entergy expects to recover from customers through the regulatory ratemaking process under which the Utility business operates. Regulatory liabilities represent probable future reductions in revenues associated with amounts that Entergy expects to benefit customers through the regulatory ratemaking process under which the Utility business operates. In addition to the regulatory assets and liabilities that are specifically disclosed on the face of the balance sheets, the tables below provide detail of “Other regulatory assets” and “Other regulatory liabilities” that are included on Entergy’s and the Registrant Subsidiaries’ balance sheets as of December 31, 2021 and 2020:

Other Regulatory Assets

Entergy
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
$2,327.7 $3,027.5 
Removal costs (Note 9)
1,488.8 893.8 
Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 2 - Hurricane Ida and Storm Cost Recovery Filings with Retail Regulators and Note 5 - Securitization Bonds)
993.6 379.2 
Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
935.5 1,018.9 
Retired electric and gas meters - recovered through retail rates as determined by retail regulators
179.4 192.1 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
133.1 105.7 
Opportunity Sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding) (b)
131.8 131.8 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
113.2 16.9 
Unamortized loss on reacquired debt - recovered over term of debt
74.7 79.2 
Retail rate deferrals - recovered through formula rates or rate riders as rates are redetermined by retail regulators
66.1 66.0 
Attorney General litigation costs - recovered over a six-year period through March 2026 (b)
20.5 25.3 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
19.0 — 
New nuclear generation development costs - recovery through formula rate plan December 2014 through November 2022 (b)
6.8 14.2 
Other123.1 125.9 
Entergy Total$6,613.3 $6,076.5 
Entergy Arkansas
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
$640.0 $831.5 
Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
489.2 479.3 
Removal costs (Note 9)
224.3 212.6 
Opportunity sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding) (b)
131.8 131.8 
Retired electric meters - recovered over 15-year period through March 2034
43.4 46.9 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
39.8 9.5 
Storm damage costs - recovered either through securitization or retail rates (Note 5 - Entergy Arkansas Securitization Bonds)
39.3 42.7 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
32.6 10.5 
Unamortized loss on reacquired debt - recovered over term of debt
23.1 24.7 
ANO Fukushima and Flood Barrier costs - recovered through retail rates through February 2026 (Note 2 - Retail Rate Proceedings) (b)
7.3 9.1 
Retail rate deferrals - recovered through rate riders as rates are redetermined annually (b)
1.0 12.6 
Other17.9 21.2 
Entergy Arkansas Total$1,689.7 $1,832.4 
Entergy Louisiana
 20212020
 (In Millions)
Removal costs (Note 9)
$848.2 $302.5 
Storm damage costs, including hurricane costs - recovery expected through retail rates and securitization (Note 2 - Hurricane Ida and Storm Cost Recovery Filings with Retail Regulators)
773.6 94.0 
Pension & postretirement costs (Note 11 - Qualified Pension Plans and Non-Qualified Pension Plans) (a)
592.7 799.4 
Asset Retirement Obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
286.6 299.0 
Retired electric meters - recovered over a 22-year period through July 2041
91.7 96.4 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
56.3 48.8 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
55.0 5.4 
Unamortized loss on reacquired debt - recovered over term of debt
26.9 26.6 
New nuclear generation development costs - recovery through formula rate plan December 2014 through November 2022 (b)
6.7 14.0 
Other39.0 40.0 
Entergy Louisiana Total$2,776.7 $1,726.1 

Entergy Mississippi
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
$175.4 $242.7 
Removal costs (Note 9)
136.8 107.3 
Retail rate deferrals - returned through formula rates or rate riders as rates are redetermined annually
48.1 44.3 
Attorney General litigation costs - recovered over a six-year period through March 2026 (b)
20.5 25.3 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
19.0 — 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
15.0 19.2 
Qualified Pension Settlement Cost Deferral - recovered over a 10-year period through July 2031 (Note 11 - Qualified Pension Settlement Cost)
13.8 2.0 
Unamortized loss on reacquired debt - recovered over term of debt
12.2 13.5 
Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
8.4 7.9 
Other13.2 5.1 
Entergy Mississippi Total$462.4 $467.3 
Entergy New Orleans
 20212020
 (In Millions)
Removal costs (Note 9)
$91.7 $63.2 
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
44.9 75.7 
Storm damage costs, including hurricane costs - recovered through securitization or retail rates (Note 2 - Storm Cost Recovery Filings with Retail Regulators and Note 5 - Entergy New Orleans Securitization Bonds - Hurricane Isaac)
31.2 55.2 
Retired meters - recovered over a 12-year period through July 2031 (b)
19.6 21.7 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
17.4 14.3 
Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
5.4 5.2 
Unamortized loss on reacquired debt - recovered over term of debt
1.6 1.9 
Other36.8 29.6 
Entergy New Orleans Total$248.6 $266.8 

Entergy Texas
 20212020
 (In Millions)
Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 2 - Storm Cost Recovery Filings with Retail Regulators and Note 5 - Entergy Texas Securitization Bonds - Hurricane Rita and Entergy Texas Securitization Bonds - Hurricane Ike and Hurricane Gustav)
$143.1 $187.3 
Removal costs (Note 9)
98.1 115.3 
Pension & postretirement costs (Note 11 - Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
96.0 140.1 
Retired electric meters - recovered over 13-year period through February 2032
23.7 26.0 
Neches and Sabine costs - recovered over a 10-year period through September 2028 (Note 2 - Retail Rate Proceedings)
16.4 18.8 
Pension & postretirement benefits expense deferral - recovery period to be determined (Note 11 - Entergy Texas Reserve)
14.6 3.8 
Deferred COVID-19 costs - recovery period to be determined (Note 2 - Retail Rate Proceedings) (b)
11.7 12.9 
Unamortized loss on reacquired debt - recovered over term of debt
9.8 10.5 
Other7.9 10.0 
Entergy Texas Total$421.3 $524.7 
System Energy
 20212020
 (In Millions)
Pension & postretirement costs (Note 11 - Qualified Pension Plans and Other Postretirement Benefits) (a)
$160.3 $217.8 
Asset retirement obligation - recovery dependent upon timing of decommissioning (Note 9) (a)
144.4 226.3 
Removal costs - recovered through depreciation rates (Note 9)
89.7 92.9 
Unamortized loss on reacquired debt - recovered over term of debt
1.1 2.0 
System Energy Total$395.5 $539.0 

(a)Does not earn a return on investment, but is offset by related liabilities.
(b)Does not earn a return on investment.

Hurricane Ida

In August 2021, Hurricane Ida caused extensive damage to the Entergy distribution and, to a lesser extent, transmission systems across Louisiana resulting in widespread power outages. Total restoration costs for the repair and/or replacement of the electrical system damaged by Hurricane Ida for Entergy Louisiana and Entergy New Orleans are currently estimated to be approximately $2.7 billion. Also, Utility revenues in 2021 were adversely affected by extended power outages resulting from the hurricane.

Entergy has recorded accounts payable for the estimated costs incurred that were necessary to return customers to service. Entergy recorded corresponding regulatory assets of approximately $1.1 billion, including $1 billion at Entergy Louisiana and $80 million at Entergy New Orleans, and construction work in progress of approximately $1.6 billion, including $1.5 billion at Entergy Louisiana and $120 million at Entergy New Orleans. Entergy recorded the regulatory assets in accordance with its accounting policies and based on the historic treatment of such costs in its service area because management believes that recovery through some form of regulatory mechanism is probable. There are well-established mechanisms and precedent for addressing these catastrophic events and providing for recovery of prudently incurred storm costs in accordance with applicable regulatory and legal principles. Because Entergy has not gone through the regulatory process regarding these storm costs, there is an element of risk, and Entergy is unable to predict with certainty the degree of success it may have in its recovery initiatives, the amount of restoration costs that it may ultimately recover, or the timing of such recovery.

Entergy is considering all available avenues to recover storm-related costs from Hurricane Ida, including federal government assistance and securitization financing. In September 2021, Entergy Louisiana filed an application at the LPSC seeking approval of certain ratemaking adjustments in connection with the issuance of approximately $1 billion of shorter-term mortgage bonds to provide interim financing for restoration costs associated with Hurricane Ida, which bonds were issued in October 2021. Also in September 2021, as discussed below in “Storm Cost Filings with Retail Regulators - Entergy Louisiana - Hurricane Laura, Hurricane Delta, Hurricane Zeta, Winter Storm Uri, and Hurricane Ida,” Entergy Louisiana sought approval for the creation and funding of a $1 billion restricted escrow account for Hurricane Ida restoration costs, subject to a subsequent prudence review. In September 2021, Entergy New Orleans withdrew $39 million from its funded storm reserves. Storm cost recovery or financing will be subject to review by applicable regulatory authorities. In February 2022, Entergy New Orleans filed with the City Council a securitization application requesting that the City Council review Entergy New Orleans’s storm reserve and increase the storm reserve funding level to $150 million, to be funded through securitization.
Other Regulatory Liabilities

Entergy
 20212020
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$1,993.3 $1,694.1 
Louisiana Act 55 financing savings obligation (Note 3) (b)
127.4 144.3 
Retail rate over-recovery - refunded through formula rate or rate riders as rates are redetermined annually
126.5 75.1 
Vidalia purchased power agreement (Note 8) (b)
106.2 115.7 
Grand Gulf sale-leaseback - (Note 5 - Grand Gulf Sale-Leaseback Transactions)
55.6 55.6 
Asset retirement obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
45.5 29.7 
Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4 44.4 
Internal restructuring guaranteed tax credits19.8 26.4 
Deferred tax equity partnership earnings (Note 1)
18.1 — 
Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates December 2015 through November 2024
16.0 21.5 
Advanced metering system (AMS) surcharge - return to customers dependent upon AMS spend
7.3 20.1 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
— 43.5 
Other83.7 53.5 
Entergy Total$2,643.8 $2,323.9 

Entergy Arkansas
 20212020
 (In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$685.4 $597.4 
Internal restructuring guaranteed customer credits19.8 26.4 
Retail rate rider over-recovery - refunded through rate riders as rates are redetermined annually
18.9 19.6 
Deferred tax equity partnership earnings (Note 1)
18.1 — 
Formula rate plan historical year rate adjustment (Note 2 - Retail Rate Proceedings)
— 43.5 
Other1.1 — 
Entergy Arkansas Total$743.3 $686.9 
Entergy Louisiana
 20212020
 (In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$692.2 $567.7 
Louisiana Act 55 financing savings obligation (Note 3)
127.4 144.3 
Vidalia purchased power agreement (Note 8) (b)
106.2 115.7 
Asset retirement obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
45.5 29.7 
Retail rate rider over-recovery - refunded through rate riders as rates are determined annually
30.7 36.0 
Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates December 2015 through November 2024
16.0 21.5 
Derivative Instruments & Hedging Activities (Note 15)
11.4 — 
Other13.2 3.4 
Entergy Louisiana Total$1,042.6 $918.3 

Entergy Mississippi
 20212020
 (In Millions)
Retail rate rider over-recovery - refunded through rate riders as rates are redetermined annually
$34.2 $14.2 
Grand Gulf over-recovery - returned to customers through rate riders as rates are redetermined annually
15.1 1.0 
Other— 0.6 
Entergy Mississippi Total$49.3 $15.8 

Entergy Texas
 20212020
 (In Millions)
Retail refunds - return to customers to be determined
$22.8 $— 
Advanced metering system (AMS) surcharge - returned to customers dependent upon AMS spend
7.3 20.1 
Income tax rate change - refunded through a rate rider (Note 2 - Retail Rate Proceedings)
2.7 6.5 
Transition to competition costs - returned to customers through rate riders when rates are redetermined periodically
— 3.2 
Other 4.3 2.5 
Entergy Texas Total$37.1 $32.3 
System Energy
 20212020
 (In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)
$615.7 $529.0 
Grand Gulf sale-leaseback - (Note 5 - Grand Gulf Sale-Leaseback Transactions)
55.6 55.6 
Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4 44.4 
Grand Gulf sale-leaseback accumulated deferred income taxes (a)
25.6 25.7 
Entergy Mississippis accumulated accelerated Grand Gulf amortization - amortized and credited through the Unit Power Sales Agreement
3.6 10.7 
System Energy Total$744.9 $665.4 

(a)Offset by related asset.
(b)As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21% effective January 2018, the Vidalia purchased power agreement regulatory liability was reduced by $30.5 million and the Louisiana Act 55 financing savings obligation regulatory liabilities were reduced by $25 million, with corresponding increases to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

Regulatory activity regarding the Tax Cuts and Jobs Act

See the “Other Tax Matters - Tax Cuts and Jobs Act” section in Note 3 to the financial statements for discussion of the effects of the December 2017 enactment of the Tax Cuts and Jobs Act (Tax Act), including its effects on Entergy’s and the Registrant Subsidiaries’ regulatory asset/liability for income taxes.

Entergy Arkansas

Consistent with its previously stated intent to return unprotected excess accumulated deferred income taxes to customers as expeditiously as possible, Entergy Arkansas initiated a tariff proceeding in February 2018 proposing to establish a tax adjustment rider to provide retail customers with certain tax benefits of $467 million associated with the Tax Act. For the residential customer class, unprotected excess accumulated deferred income taxes were returned to customers over a 21-month period from April 2018 through December 2019. For all other customer classes, unprotected excess accumulated deferred income taxes were returned to customers over a nine-month period from April 2018 through December 2018. A true-up provision also was included in the rider, with any over- or under-returned unprotected excess accumulated deferred income taxes credited or billed to customers during the billing month of January 2020, with any residual amounts of over- or under-returned unprotected excess accumulated deferred income taxes to be flowed through Entergy Arkansas’s energy cost recovery rider. In March 2018 the APSC approved the tax adjustment rider effective with the first billing cycle of April 2018.

As discussed below, in July 2018, Entergy Arkansas made its formula rate plan filing to set its formula rate for the 2019 calendar year. A hearing was held in May 2018 regarding the APSC’s inquiries into the effects of the Tax Act, including Entergy Arkansas’s proposal to utilize its formula rate plan rider for its customers to realize the remaining benefits of the Tax Act. Entergy Arkansas’s formula rate plan rider included a netting adjustment that compared actual annual results to the allowed rate of return on common equity. In July 2018 the APSC issued an order agreeing with Entergy Arkansas’s proposal to have the effects of the Tax Act on current income tax expense flow through Entergy Arkansas’s formula rate plan rider and with Entergy Arkansas’s treatment of protected and unprotected excess accumulated deferred income taxes. The APSC also directed Entergy Arkansas to submit in the tax adjustment rider proceeding, discussed above, the adjustments to all other riders affected by the Tax Act and to include an amendment for a true up mechanism where a rider affected by the Tax Act does not already contain a
true-up mechanism. Pursuant to a 2018 settlement agreement in Entergy Arkansas’s formula rate plan proceeding, Entergy Arkansas also removed the net operating loss accumulated deferred income tax asset caused by the Tax Act from Entergy Arkansas’s tax adjustment rider. Entergy Arkansas’s compliance tariff filings were accepted by the APSC in October 2018. In February 2021, pursuant to its 2020 formula rate plan evaluation report settlement, Entergy Arkansas flowed $5.6 million in credits to customers through the tax adjustment rider based on the outcome of certain federal tax positions and a decrease in the state tax rate.

Entergy Louisiana

In an electric formula rate plan settlement approved by the LPSC in April 2018 the parties agreed that Entergy Louisiana would return to customers one-half of its eligible unprotected excess deferred income taxes from May 2018 through December 2018 and return to customers the other half from January 2019 through August 2022. In addition, the settlement provided that in order to flow back to customers certain other tax benefits created by the Tax Act, Entergy Louisiana established a regulatory liability effective January 1, 2018 in the amount of $9.1 million per month to reflect these tax benefits already included in retail rates until new base rates under the formula rate plan were established in September 2018, and this regulatory liability was returned to customers over the September 2018 through August 2019 formula rate plan rate-effective period. The LPSC staff and intervenors in the settlement reserved the right to obtain data from Entergy Louisiana to confirm the determination of excess accumulated deferred income taxes resulting from the Tax Act and the analysis thereof as part of the formula rate plan review proceeding for the 2017 test year filing which, as discussed below, Entergy Louisiana filed in June 2018.

Entergy New Orleans

After enactment of the Tax Act the City Council passed a resolution ordering Entergy New Orleans to, effective January 1, 2018, record deferred regulatory liabilities to account for the Tax Act’s effect on Entergy New Orleans’s revenue requirement and to make a filing by mid-March 2018 regarding the Tax Act’s effects on Entergy New Orleans’s operating income and rate base and potential mechanisms for customers to receive benefits of the Tax Act. The City Council’s resolution also directed Entergy New Orleans to request that Entergy Services file with the FERC for revisions of the Unit Power Sales Agreement and MSS-4 replacement tariffs to address the return of excess accumulated deferred income taxes. Entergy submitted filings of this type to the FERC.

In March 2018, Entergy New Orleans filed its response to the resolution stating that the Tax Act reduced income tax expense from what was then reflected in rates by approximately $8.2 million annually for electric operations and by approximately $1.3 million annually for gas operations. In the filing, Entergy New Orleans proposed to return to customers from June 2018 through August 2019 the benefits of the reduction in income tax expense and its unprotected excess accumulated deferred income taxes through a combination of bill credits and investments in energy efficiency programs, grid modernization, and Smart City projects. Entergy New Orleans submitted supplemental information in April 2018 and May 2018. Shortly thereafter, Entergy New Orleans and the City Council’s advisors reached an agreement in principle that provides for benefits that will be realized by Entergy New Orleans customers through bill credits that started in July 2018 and offsets to future investments in energy efficiency programs, grid modernization, and Smart City projects, as well as additional benefits related to the filings made at the FERC. The agreement in principle was approved by the City Council in June 2018.

Entergy Texas

After enactment of the Tax Act the PUCT issued an order requiring most utilities, including Entergy Texas, beginning January 25, 2018, to record a regulatory liability for the difference between revenues collected under existing rates and revenues that would have been collected had existing rates been set using the new federal income tax rates and also for the balance of excess accumulated deferred income taxes. Entergy Texas had previously provided information to the PUCT staff and stated that it expected the PUCT to address the lower tax expense as part of Entergy Texas’s rate case expected to be filed in May 2018.
In May 2018, Entergy Texas filed its 2018 base rate case with the PUCT. Entergy Texas’s proposed rates and revenues reflected the inclusion of the federal income tax reductions due to the Tax Act. The PUCT issued an order in December 2018 establishing that 1) $25 million be credited to customers through a rider to reflect the lower federal income tax rate applicable to Entergy Texas from January 2018 through the date new rates were implemented, 2) $242.5 million of protected excess accumulated deferred income taxes be returned to customers through base rates under the average rate assumption method over the lives of the associated assets, and 3) $185.2 million of unprotected excess accumulated deferred income taxes be returned to customers through a rider. The unprotected excess accumulated deferred income taxes rider includes carrying charges and is in effect over a period of 12 months for larger customers and over a period of four years for other customers.

System Energy

In a filing made with the FERC in March 2018, System Energy proposed revisions to the Unit Power Sales Agreement to reflect the effects of the Tax Act. In the filing System Energy proposed to return identified quantities of unprotected excess accumulated deferred income taxes to its customers by the end of 2018. In May 2018 the FERC accepted System Energy’s proposed tax revisions with an effective date of June 1, 2018, subject to refund and the outcome of settlement and hearing procedures. Settlement discussions were terminated in April 2019, and a hearing was held in March 2020. The retail regulators of the Utility operating companies that are parties to the Unit Power Sales Agreement challenged the treatment and amount of excess accumulated deferred income tax liabilities associated with uncertain tax positions related to nuclear decommissioning. In July 2020 the presiding ALJ in the proceeding issued an initial decision finding that there is an additional $147 million in unprotected excess accumulated deferred income taxes related to System Energy’s uncertain decommissioning tax deduction. The initial decision determined that System Energy should have included the $147 million in its March 2018 filing. System Energy had not included credits related to the effect of the Tax Act on the uncertain decommissioning tax position because it was uncertain whether the IRS would allow the deduction. The initial decision rejected both System Energy’s alternative argument that any crediting should occur over a ten-year period and the retail regulators’ argument that any crediting should occur over a two-year period. Instead, the initial decision concluded that System Energy should credit the additional unprotected excess accumulated deferred income taxes in a single lump sum revenue requirement reduction following a FERC order addressing the initial decision.

The ALJ initial decision is an interim step in the FERC litigation process. In September 2020, System Energy filed a brief on exceptions with the FERC, re-urging its positions and requesting the reversal of the ALJ’s initial decision. In December 2020, the LPSC, APSC, MPSC, City Council, and FERC trial staff filed briefs opposing exceptions. The FERC will review the case and issue an order in the proceeding, and the FERC may accept, reject, or modify the ALJ’s initial decision in whole or in part. Credits, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.

As discussed below in Grand Gulf Sale-leaseback Renewal Complaint and Uncertain Tax Position Rate Base Issue,” in September 2020 the IRS issued a Notice of Proposed Adjustment (NOPA) and Entergy executed it. In September 2020, System Energy filed a motion to lodge the NOPA into the record in the FERC proceeding. In October 2020 the LPSC, APSC, MPSC, City Council, and FERC trial staff filed oppositions to System Energy’s motion. As a result of the NOPA, System Energy filed, in October 2020, a new Federal Power Act section 205 filing at the FERC to credit the excess accumulated deferred income taxes resulting from the decommissioning uncertain tax position. System Energy proposes to credit the entire amount of the excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position by issuing a one-time credit of $17.8 million. In November 2020, the LPSC, APSC, MPSC, and City Council filed a protest to the filing, and System Energy responded.

In November 2020 the IRS issued the Revenue Agent’s Report (RAR) for the 2014-2015 tax years and in December 2020 Entergy executed it. In December 2020, System Energy filed a motion to lodge the RAR into the record in the FERC proceeding addressing the Tax Cuts and Jobs Act. In January 2021 the LPSC, APSC, MPSC,
and City Council filed a joint answer opposing System Energy’s motion, and the FERC trial staff also filed an answer opposing System Energy’s motion.

As a result of the RAR, in December 2020, System Energy also filed an amendment to its Federal Power Act section 205 filing to credit excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position. The amendment proposed the inclusion of the RAR as support for the filing. In December 2020, the LPSC, APSC, and City Council filed a protest in response to the amendment, reiterating objections to the filing to credit excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position. In February 2021 the FERC issued an order accepting System Energy’s Federal Power Act section 205 filing subject to refund, setting it for hearing, and holding the hearing in abeyance.

In November 2020, System Energy filed a motion to vacate the ALJ’s decision, arguing that it had been overtaken by changed circumstances because of the IRS’s determination resulting from the NOPA and RAR. In January 2021 the LPSC, APSC, MPSC, and City Council filed a joint answer opposing System Energy’s motion, and the FERC trial staff also filed an answer opposing System Energy’s motion. Additional responsive pleadings were filed in February and March 2021. There is no formal deadline for FERC to rule on the motion.

Fuel and purchased power cost recovery

The Utility operating companies are allowed to recover fuel and purchased power costs through fuel mechanisms included in electric and gas rates that are recorded as fuel cost recovery revenues.  The difference between revenues collected and the current fuel and purchased power costs is generally recorded as “Deferred fuel costs” on the Utility operating companies’ financial statements.  The table below shows the amount of deferred fuel costs as of December 31, 2021 and 2020 that Entergy expects to recover (or return to customers) through fuel mechanisms, subject to subsequent regulatory review.

 20212020
 (In Millions)
Entergy Arkansas (a)$177.6 $15.2 
Entergy Louisiana (b)$213.5 $170.4 
Entergy Mississippi$121.9 ($14.7)
Entergy New Orleans (b)($3.5)$6.2 
Entergy Texas$48.3 ($85.4)

(a)Includes $68.8 million in 2021 and $68.2 million in 2020 of fuel and purchased power costs whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.
(b)Includes $168.1 million in both years for Entergy Louisiana and $4.1 million in both years for Entergy New Orleans of fuel, purchased power, and capacity costs, which do not currently earn a return on investment and whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.

Entergy Arkansas

Energy Cost Recovery Rider

Entergy Arkansas’s retail rates include an energy cost recovery rider to recover fuel and purchased energy costs in monthly customer bills.  The rider utilizes the prior calendar-year energy costs and projected energy sales for the twelve-month period commencing on April 1 of each year to develop an energy cost rate, which is redetermined annually and includes a true-up adjustment reflecting the over- or under-recovery, including carrying
charges, of the energy costs for the prior calendar year.  The energy cost recovery rider tariff also allows an interim rate request depending upon the level of over- or under-recovery of fuel and purchased energy costs.

In January 2014, Entergy Arkansas filed a motion with the APSC relating to its upcoming energy cost rate redetermination filing that was made in March 2014. In that motion, Entergy Arkansas requested that the APSC authorize Entergy Arkansas to exclude from the redetermination of its 2014 energy cost rate $65.9 million of incremental fuel and replacement energy costs incurred in 2013 as a result of the ANO stator incident. Entergy Arkansas requested that the APSC authorize Entergy Arkansas to retain that amount in its deferred fuel balance, with recovery to be reviewed in a later period after more information was available regarding various claims associated with the ANO stator incident. In February 2014 the APSC approved Entergy Arkansas’s request to retain that amount in its deferred fuel balance. In July 2017, Entergy Arkansas filed for a change in rates pursuant to its formula rate plan rider. In that proceeding, the APSC approved a settlement agreement agreed upon by the parties, including a provision that requires Entergy Arkansas to initiate a regulatory proceeding for the purpose of recovering funds currently withheld from rates and related to the stator incident, including the $65.9 million of deferred fuel and purchased energy costs previously noted, subject to certain timelines and conditions set forth in the settlement agreement. In October 2021 the APSC approved Entergy Arkansas’s second request to extend the deadline for initiating a regulatory proceeding for the purpose of recovering funds related to the stator incident for twelve additional months, or until December 1, 2022. See the “ANO Damage, Outage, and NRC Reviews” section in Note 8 to the financial statements for further discussion of the ANO stator incident.

In March 2017, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01164 per kWh to $0.01547 per kWh. The APSC staff filed testimony in March 2017 recommending that the redetermined rate be implemented with the first billing cycle of April 2017 under the normal operation of the tariff. Accordingly, the redetermined rate went into effect on March 31, 2017 pursuant to the tariff. In July 2017 the Arkansas Attorney General requested additional information to support certain of the costs included in Entergy Arkansas’s 2017 energy cost rate redetermination.

In March 2018, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01547 per kWh to $0.01882 per kWh. The Arkansas Attorney General filed a response to Entergy Arkansas’s annual redetermination filing requesting that the APSC suspend the proposed tariff to investigate the amount of the redetermination or, alternatively, to allow recovery subject to refund. Among the reasons the Attorney General cited for suspension were questions pertaining to how Entergy Arkansas forecasted sales and potential implications of the Tax Cuts and Jobs Act. Entergy Arkansas replied to the Attorney General’s filing and stated that, to the extent there are questions pertaining to its load forecasting or the operation of the energy cost recovery rider, those issues exceed the scope of the instant rate redetermination. Entergy Arkansas also stated that potential effects of the Tax Cuts and Jobs Act are appropriately considered in the APSC’s separate proceeding regarding potential implications of the tax law. The APSC general staff filed a reply to the Attorney General’s filing and agreed that Entergy Arkansas’s filing complied with the terms of the energy cost recovery rider. The redetermined rate became effective with the first billing cycle of April 2018. Subsequently in April 2018 the APSC issued an order declining to suspend Entergy Arkansas’s energy cost recovery rider rate and declining to require further investigation at that time of the issues suggested by the Attorney General in the proceeding. Following a period of discovery, the Attorney General filed a supplemental response in October 2018 raising new issues with Entergy Arkansas’s March 2018 rate redetermination and asserting that $45.7 million of the increase should be collected subject to refund pending further investigation. Entergy Arkansas filed to dismiss the Attorney General’s supplemental response, the APSC general staff filed a motion to strike the Attorney General’s filing, and the Attorney General filed a supplemental response disputing Entergy Arkansas and the APSC staff’s filing. Applicable APSC rules and processes authorize its general staff to initiate periodic audits of Entergy Arkansas’s energy cost recovery rider. In late-2018 the APSC general staff notified Entergy Arkansas it has initiated an audit of the 2017 fuel costs. The time in which the audit will be complete is uncertain at this time.
In March 2019, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected a decrease from $0.01882 per kWh to $0.01462 per kWh and became effective with the first billing cycle in April 2019. In March 2019 the Arkansas Attorney General filed a response to Entergy Arkansas’s annual adjustment and included with its filing a motion for investigation of alleged overcharges to customers in connection with the FERC’s October 2018 order in the opportunity sales proceeding. Entergy Arkansas filed its response to the Attorney General’s motion in April 2019 in which Entergy Arkansas stated its intent to initiate a proceeding to address recovery issues related to the October 2018 FERC order. In May 2019, Entergy Arkansas initiated the opportunity sales recovery proceeding, discussed below, and requested that the APSC establish that proceeding as the single designated proceeding in which interested parties may assert claims related to the appropriate retail rate treatment of the FERC October 2018 order and related FERC orders in the opportunity sales proceeding. In June 2019 the APSC granted Entergy Arkansas’s request and also denied the Attorney General’s motion in the energy cost recovery proceeding seeking an investigation into Entergy Arkansas’s annual energy cost recovery rider adjustment and referred the evaluation of such matters to the opportunity sales recovery proceeding.

In March 2020, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected a decrease from $0.01462 per kWh to $0.01052 per kWh. The redetermined rate became effective with the first billing cycle in April 2020 through the normal operation of the tariff.

In March 2021, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected a decrease from $0.01052 per kWh to $0.00959 per kWh. The redetermined rate calculation also included an adjustment to account for a portion of the increased fuel costs resulting from the February 2021 winter storms. The redetermined rate became effective with the first billing cycle in April 2021 through the normal operation of the tariff.

Entergy Louisiana

Entergy Louisiana recovers electric fuel and purchased power costs for the billing month based upon the level of such costs incurred two months prior to the billing month. Entergy Louisiana’s purchased gas adjustments include estimates for the billing month adjusted by a surcharge or credit that arises from an annual reconciliation of fuel costs incurred with fuel cost revenues billed to customers, including carrying charges.

In July 2014 the LPSC authorized its staff to initiate an audit of the fuel adjustment clause filings by Entergy Gulf States Louisiana, whose business was combined with Entergy Louisiana in 2015. The audit includes a review of the reasonableness of charges flowed through Entergy Gulf States Louisiana’s fuel adjustment clause for the period from 2010 through 2013. In January 2019 the LPSC staff consultant issued its audit report. In its report, the LPSC staff consultant recommended that Entergy Louisiana refund approximately $900,000, plus interest, to customers based upon the imputation of a claim of vendor fault in servicing its nuclear plant. Entergy Louisiana recorded a provision in the first quarter 2019 for the potential outcome of the audit. In August 2019, Entergy Louisiana filed direct testimony challenging the basis for the LPSC staff’s recommended disallowance and providing an alternative calculation of replacement power costs should it be determined that a disallowance is appropriate. Entergy Louisiana’s calculation would require no refund to customers.

In July 2014 the LPSC authorized its staff to initiate an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed by Entergy Louisiana through its fuel adjustment clause for the period from 2010 through 2013. In January 2019 the LPSC staff issued its audit report recommending that Entergy Louisiana refund approximately $7.3 million, plus interest, to customers based upon the imputation of a claim of vendor fault in servicing its nuclear plant. Entergy Louisiana recorded a provision in the first quarter 2019 for the potential outcome of the audit. In August 2019, Entergy Louisiana filed direct testimony challenging the basis for the LPSC staff’s recommended disallowance and providing an alternative calculation of replacement power costs should it be determined that a disallowance is appropriate. Entergy Louisiana’s calculation
would require a refund to customers of approximately $4.3 million, plus interest, as compared to the LPSC staff’s recommendation of $7.3 million, plus interest. Responsive testimony was filed by the LPSC staff and intervenors in September 2019; all parties either agreed with or did not oppose Entergy Louisiana’s alternative calculation of replacement power costs.

In November 2019 the pending LPSC proceedings for the 2010-2013 Entergy Louisiana and Entergy Gulf States Louisiana audits were consolidated to facilitate a settlement of both fuel audits. In December 2019 an unopposed settlement was reached that requires a refund to legacy Entergy Louisiana customers of approximately $2.3 million, including interest, and no refund to legacy Entergy Gulf States Louisiana customers. The LPSC approved the settlement in January 2020. A one-time refund was made in February 2020.

In March 2020 the LPSC staff provided notice of an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s fuel adjustment clause for the period from 2016 through 2019. In September 2021 the LPSC submitted its audit report and found that all costs recovered through the fuel adjustment clause were reasonable and eligible for recovery through the fuel adjustment clause. Intervenors are conducting discovery regarding the LPSC staff’s report.

In February 2021, Entergy Louisiana incurred extraordinary fuel costs associated with the February 2021 winter storms. To mitigate the effect of these costs on customer bills, in March 2021 Entergy Louisiana requested and the LPSC approved the deferral and recovery of $166 million in incremental fuel costs over five months beginning in April 2021. The incremental fuel costs remain subject to review for reasonableness and eligibility for recovery through the fuel adjustment clause mechanism. The final amount of incremental fuel costs is subject to change through the resettlement process. At its April 2021 meeting, the LPSC authorized its staff to review the prudence of the February 2021 fuel costs incurred by all LPSC-jurisdictional utilities. At its June 2021 meeting, the LPSC approved the hiring of consultants to assist its staff in this review. Discovery is ongoing.

In March 2021 the LPSC staff provided notice of an audit of Entergy Louisiana’s purchased gas adjustment clause filings covering the period January 2018 through December 2020. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s purchased gas adjustment clause for that period. Discovery is ongoing, and no audit report has been filed.

Entergy Mississippi

Entergy Mississippi’s rate schedules include an energy cost recovery rider that is adjusted annually to reflect accumulated over- or under-recoveries.  Entergy Mississippi’s fuel cost recoveries are subject to annual audits conducted pursuant to the authority of the MPSC.

In November 2018, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an under-recovery of approximately $57 million as of September 30, 2018. In January 2019 the MPSC approved the proposed energy cost factor effective for February 2019 bills.

In November 2019, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation included $39.6 million of prior over-recovery flowing back to customers beginning February 2020. Entergy Mississippi’s balance in its deferred fuel account did not decrease as expected after implementation of the new factor. In an effort to assist customers during the COVID-19 pandemic, in May 2020, Entergy Mississippi requested an interim adjustment to the energy cost recovery rider to credit approximately $50 million from the over-recovered balance in the deferred fuel account to customers over four consecutive billing months. The MPSC approved this interim adjustment in May 2020 effective for June through September 2020 bills.
In November 2020, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an over-recovery of approximately $24.4 million as of September 30, 2020. In January 2021 the MPSC approved the proposed energy cost factor effective for February 2021 bills.

In November 2021, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an under-recovery of approximately $80.6 million as of September 30, 2021. In December 2021, at the request of the MPSC, Entergy Mississippi submitted a proposal to mitigate the impact of rising fuel costs on customer bills during 2022. Entergy Mississippi proposed that the deferred fuel balance as of December 31, 2021, which was $121.9 million, be amortized over three years, and that the MPSC authorize Entergy Mississippi to apply its weighted-average cost of capital as the carrying cost for the unamortized fuel balance. In January 2022 the MPSC approved the amortization of $100 million of the deferred fuel balance over two years and authorized Entergy Mississippi to apply its weighted-average cost of capital as the carrying cost for the unamortized fuel balance. The MPSC approved the proposed energy cost factor effective for February 2022 bills.

Entergy New Orleans

Entergy New Orleans’s electric rate schedules include a fuel adjustment tariff designed to reflect no more than targeted fuel and purchased power costs, adjusted by a surcharge or credit for deferred fuel expense arising from the monthly reconciliation of actual fuel and purchased power costs incurred with fuel cost revenues billed to customers, including carrying charges.

Entergy New Orleans’s gas rate schedules include a purchased gas adjustment to reflect estimated gas costs for the billing month, adjusted by a surcharge or credit similar to that included in the electric fuel adjustment clause, including carrying charges.

Entergy Texas

Entergy Texas’s rate schedules include a fixed fuel factor to recover fuel and purchased power costs, including interest, not recovered in base rates.  Semi-annual revisions of the fixed fuel factor are made in March and September based on the market price of natural gas and changes in fuel mix.  The amounts collected under Entergy Texas’s fixed fuel factor and any interim surcharge or refund are subject to fuel reconciliation proceedings before the PUCT. A fuel reconciliation is required to be filed at least once every three years and outside of a base rate case filing.

In September 2019, Entergy Texas filed an application to reconcile its fuel and purchased power costs for the period from April 2016 through March 2019. During the reconciliation period, Entergy Texas incurred approximately $1.6 billion in Texas jurisdictional eligible fuel and purchased power expenses, net of certain revenues credited to such expenses and other adjustments. Entergy Texas estimated an under-recovery balance of approximately $25.8 million, including interest, which Entergy Texas requested authority to carry over as the beginning balance for the subsequent reconciliation period beginning April 2019. In March 2020 an intervenor filed testimony proposing that the PUCT disallow: (1) $2 million in replacement power costs associated with generation outages during the reconciliation period; and (2) $24.4 million associated with the operation of the Spindletop natural gas storage facility during the reconciliation period.  In April 2020, Entergy Texas filed rebuttal testimony refuting all points raised by the intervenor.  In June 2020 the parties filed a stipulation and settlement agreement, which included a $1.2 million disallowance not associated with any particular issue raised by any party. The PUCT approved the settlement in August 2020.

In July 2020, Entergy Texas filed an application with the PUCT to implement an interim fuel refund of $25.5 million, including interest. Entergy Texas proposed that the interim fuel refund be implemented beginning with the first August 2020 billing cycle over a three-month period for smaller customers and in a lump sum amount
in the billing month of August 2020 for transmission-level customers. The interim fuel refund was approved in July 2020, and Entergy Texas began refunds in August 2020.

In February 2021, Entergy Texas filed an application to implement a fuel refund for a cumulative over-recovery of approximately $75 million that is primarily attributable to settlements received by Entergy Texas from MISO related to Hurricane Laura. Entergy Texas planned to issue the refund over the period of March through August 2021. On February 22, 2021, Entergy Texas filed a motion to abate its fuel refund proceeding to assess how the February 2021 winter storm impacted Entergy Texas’s fuel over-recovery position. In March 2021, Entergy Texas withdrew its application to implement the fuel refund. Entergy Texas is continuing to evaluate its fuel balance and will file a subsequent refund or surcharge application consistent with the requirements of the PUCT’s rules.
Entergy Arkansas Opportunity Sales Proceeding

In June 2009 the LPSC filed a complaint requesting that the FERC determine that certain of Entergy Arkansas’s sales of electric energy to third parties: (a) violated the provisions of the System Agreement that allocated the energy generated by Entergy System resources; (b) imprudently denied the Entergy System and its ultimate consumers the benefits of low-cost Entergy System generating capacity; and (c) violated the provision of the System Agreement that prohibited sales to third parties by individual companies absent an offer of a right-of-first-refusal to other Utility operating companies.  The LPSC’s complaint challenged sales made beginning in 2002 and requested refunds.  In July 2009 the Utility operating companies filed a response to the complaint arguing among other things that the System Agreement contemplates that the Utility operating companies may make sales to third parties for their own account, subject to the requirement that those sales be included in the load (or load shape) for the applicable Utility operating company.  The FERC subsequently ordered a hearing in the proceeding.

After a hearing, the ALJ issued an initial decision in December 2010.  The ALJ found that the System Agreement allowed for Entergy Arkansas to make the sales to third parties but concluded that the sales should be accounted for in the same manner as joint account sales.  The ALJ concluded that “shareholders” should make refunds of the damages to the Utility operating companies, along with interest.  Entergy disagreed with several aspects of the ALJ’s initial decision and in January 2011 filed with the FERC exceptions to the decision.
The FERC issued a decision in June 2012 and held that, while the System Agreement is ambiguous, it does provide authority for individual Utility operating companies to make opportunity sales for their own account and Entergy Arkansas made and priced these sales in good faith.  The FERC found, however, that the System Agreement does not provide authority for an individual Utility operating company to allocate the energy associated with such opportunity sales as part of its load but provides a different allocation authority.  The FERC further found that the after-the-fact accounting methodology used to allocate the energy used to supply the sales was inconsistent with the System Agreement.  The FERC in its decision established further hearing procedures to quantify the effect of repricing the opportunity sales in accordance with the FERC’s June 2012 decision. The hearing was held in May 2013 and the ALJ issued an initial decision in August 2013. The LPSC, the APSC, the City Council, and FERC staff filed briefs on exceptions and/or briefs opposing exceptions. Entergy filed a brief on exceptions requesting that the FERC reverse the initial decision and a brief opposing certain exceptions taken by the LPSC and FERC staff.

In April 2016 the FERC issued orders addressing requests for rehearing filed in July 2012 and the ALJ’s August 2013 initial decision. The first order denied Entergy’s request for rehearing and affirmed the FERC’s earlier rulings that Entergy’s original methodology for allocating energy costs to the opportunity sales was incorrect and, as a result, Entergy Arkansas must make payments to the other Utility operating companies to put them in the same position that they would have been in absent the incorrect allocation. The FERC clarified that interest should be included with the payments. The second order affirmed in part, and reversed in part, the rulings in the ALJ’s August 2013 initial decision regarding the methodology that should be used to calculate the payments Entergy Arkansas is to make to the other Utility operating companies. The FERC affirmed the ALJ’s ruling that a full re-run of intra-system bills should be performed but required that methodology be modified so that the sales have the same priority for purposes of energy allocation as joint account sales. The FERC reversed the ALJ’s decision that any payments by Entergy Arkansas should be reduced by 20%. The FERC also reversed the ALJ’s decision that adjustments to other System Agreement service schedules and excess bandwidth payments should not be taken into account when calculating the payments to be made by Entergy Arkansas. The FERC held that such adjustments and excess bandwidth payments should be taken into account but ordered further proceedings before an ALJ to address whether a cap on any reduction due to bandwidth payments was necessary and to implement the other adjustments to the calculation methodology.

In May 2016, Entergy Services filed a request for rehearing of the FERC’s April 2016 order arguing that payments made by Entergy Arkansas should be reduced as a result of the timing of the LPSC’s approval of certain contracts. Entergy Services also filed a request for clarification and/or rehearing of the FERC’s April 2016 order addressing the ALJ’s August 2013 initial decision. The APSC and the LPSC also filed requests for rehearing of the FERC’s April 2016 order. In September 2017 the FERC issued an order denying the request for rehearing on the issue of whether any payments by Entergy Arkansas to the other Utility operating companies should be reduced due to the timing of the LPSC’s approval of Entergy Arkansas’s wholesale baseload contract with Entergy Louisiana. In November 2017 the FERC issued an order denying all of the remaining requests for rehearing of the April 2016 order. In November 2017, Entergy Services filed a petition for review in the D.C. Circuit of the FERC’s orders in the first two phases of the opportunity sales case. In December 2017 the D.C. Circuit granted Entergy Services’ request to hold the appeal in abeyance pending final resolution of the related proceeding before the FERC. In January 2018 the APSC and the LPSC filed separate petitions for review in the D.C. Circuit, and the D.C. Circuit consolidated the appeals with Entergy Services’ appeal.

The hearing required by the FERC’s April 2016 order was held in May 2017. In July 2017 the ALJ issued an initial decision addressing whether a cap on any reduction due to bandwidth payments was necessary and whether to implement the other adjustments to the calculation methodology. In August 2017 the Utility operating companies, the LPSC, the APSC, and FERC staff filed individual briefs on exceptions challenging various aspects of the initial decision. In September 2017 the Utility operating companies, the LPSC, the APSC, the MPSC, the City Council, and FERC staff filed separate briefs opposing exceptions taken by various parties.
Based on testimony previously submitted in the case and its assessment of the April 2016 FERC orders, in the first quarter 2016, Entergy Arkansas recorded a liability of $87 million, which included interest, for its estimated increased costs and payment to the other Utility operating companies, and a deferred fuel regulatory asset of $75 million. Following its assessment of the course of the proceedings, including the FERC’s denial of rehearing in November 2017 described above, in the fourth quarter 2017, Entergy Arkansas recorded an additional liability of $35 million and a regulatory asset of $31 million.

In October 2018 the FERC issued an order addressing the ALJ’s July 2017 initial decision. The FERC reversed the ALJ’s decision to cap the reduction in Entergy Arkansas’s payment to account for the increased bandwidth payments that Entergy Arkansas made to the other operating companies. The FERC also reversed the ALJ’s decision that Grand Gulf sales from January through September 2000 should be included in the calculation of Entergy Arkansas’s payment. The FERC affirmed on other grounds the ALJ’s rejection of the LPSC’s claim that certain joint account sales should be accounted for as part of the calculation of Entergy Arkansas’s payment. In November 2018 the LPSC requested rehearing of the FERC’s October 2018 decision. In December 2019 the FERC denied the LPSC’s request for rehearing. In January 2020 the LPSC appealed the December 2019 decision to the D.C. Circuit.

In December 2018, Entergy made a compliance filing in response to the FERC’s October 2018 order. The compliance filing provided a final calculation of Entergy Arkansas’s payments to the other Utility operating companies, including interest. No protests were filed in response to the December 2018 compliance filing. The December 2018 compliance filing is pending FERC action. Refunds and interest in the following amounts were paid by Entergy Arkansas to the other operating companies in December 2018:

 Total refunds including interest
Payment/(Receipt)
 (In Millions)
PrincipalInterestTotal
Entergy Arkansas$68$67$135
Entergy Louisiana($30)($29)($59)
Entergy Mississippi($18)($18)($36)
Entergy New Orleans($3)($4)($7)
Entergy Texas($17)($16)($33)

Entergy Arkansas previously recognized a regulatory asset with a balance of $116 million as of December 31, 2018 for a portion of the payments due as a result of this proceeding.

As described above, the FERC’s opportunity sales orders have been appealed to the D.C. Circuit. In February 2020 all of the appeals were consolidated and in April 2020 the D.C. Circuit established a briefing schedule. Briefing was completed in September 2020 and oral argument was heard in December 2020. In July 2021 the D.C. Circuit issued a decision denying all of the petitions for review filed in response to the FERC’s opportunity sales orders.

In February 2019 the LPSC filed a new complaint relating to two issues that were raised in the opportunity sales proceeding, but that, in its October 2018 order, the FERC held were outside the scope of the proceeding. In March 2019, Entergy Services filed an answer and motion to dismiss the new complaint. In November 2019 the FERC issued an order denying the LPSC’s complaint. The order concluded that the settlement agreement approved by the FERC in December 2015 terminating the System Agreement barred the LPSC’s new complaint. In December 2019 the LPSC requested rehearing of the FERC’s November 2019 order, and in July 2020 the FERC issued an order dismissing the LPSC’s request for rehearing. In September 2020 the LPSC appealed to the D.C. Circuit the FERC’s orders dismissing the new opportunity sales complaint. In November 2020 the D.C. Circuit
issued an order establishing that briefing will occur in January 2021 through April 2021. Oral argument was held in September 2021. In December 2021 the D.C. Circuit denied the LPSC’s Petition for Review of the new opportunity sales complaint. The opportunity sales cases are complete at FERC and at the D.C. Circuit and no additional refund amounts are owed by Entergy Arkansas.

In May 2019, Entergy Arkansas filed an application and supporting testimony with the APSC requesting approval of a special rider tariff to recover the costs of these payments from its retail customers over a 24-month period.  The application requested that the APSC approve the rider to take effect within 30 days or, if suspended by the APSC as allowed by commission rule, approve the rider to take effect in the first billing cycle of the first month occurring 30 days after issuance of the APSC’s order approving the rider. In June 2019 the APSC suspended Entergy Arkansas’s tariff and granted Entergy Arkansas’s motion asking the APSC to establish the proceeding as the single designated proceeding in which interested parties may assert claims related to the appropriate retail rate treatment of the FERC’s October 2018 order and related FERC orders in the opportunity sales proceeding. In January 2020 the APSC adopted a procedural schedule with a hearing in April 2020. In January 2020 the Attorney General and Arkansas Electric Energy Consumers, Inc. filed a joint motion seeking to dismiss Entergy Arkansas’s application alleging that the APSC, in a prior proceeding, ruled on the issues addressed in the application and determined that Entergy Arkansas’s requested relief violates the filed rate doctrine and the prohibition against retroactive ratemaking. Entergy Arkansas responded to the joint motion in February 2020 rebutting these arguments, including demonstrating that the claims in this proceeding differ substantially from those the APSC addressed previously and that the payment resulting from a FERC tariff violation for which Entergy Arkansas seeks retail cost recovery in this proceeding differs materially from the refunds resulting from a FERC tariff amendment that the APSC previously rejected on filed rate doctrine and the retroactive ratemaking grounds. In addition, in January 2020 the Attorney General and Arkansas Electric Energy Consumers, Inc. filed testimony opposing the recovery by Entergy Arkansas of the opportunity sales payment but also claiming that certain components of the payment should be segregated and refunded to customers. In March 2020, Entergy Arkansas filed rebuttal testimony.

In July 2020 the APSC issued a decision finding that Entergy Arkansas’s application is not in the public interest. The order also directed Entergy Arkansas to refund to its retail customers within 30 days of the order the FERC-determined over-collection of $13.7 million, plus interest, associated with a recalculated bandwidth remedy. In addition to these primary findings, the order also denied the Attorney General’s request for Entergy Arkansas to prepare a compliance filing detailing all of the retail impacts from the opportunity sales and denied a request by the Arkansas Electric Energy Consumers to recalculate all costs using the revised responsibility ratio. Entergy Arkansas filed a motion for temporary stay of the 30-day requirement to allow Entergy Arkansas a reasonable opportunity to seek rehearing of the APSC order, but in July 2020 the APSC denied Entergy Arkansas’s request for a stay and directed Entergy Arkansas to refund to its retail customers the component of the total FERC-determined opportunity sales payment that was associated with increased bandwidth remedy payments of $13.7 million, plus interest. The refunds were issued in the August 2020 billing cycle. While the APSC denied Entergy Arkansas’s stay request, Entergy Arkansas believes its actions were prudent and, therefore, the costs, including the $13.7 million, plus interest, are recoverable. In July 2020, Entergy Arkansas requested rehearing of the APSC order, which rehearing was denied by the APSC in August 2020. In September 2020, Entergy Arkansas filed a complaint in the U.S. District Court for the Eastern District of Arkansas challenging the APSC’s order denying Entergy Arkansas’s request to recover the costs of these payments. In October 2020 the APSC filed a motion to dismiss Entergy Arkansas’s complaint, to which Entergy Arkansas responded. Also in December 2020, Entergy Arkansas and the APSC held a pre-trial conference, and filed a report with the court in January 2021. The court held a hearing in February 2021 regarding issues addressed in the pre-trial conference report, and in June 2021 the court stayed all discovery until it rules on pending motions, after which the court will issue an amended schedule if necessary.
Complaints Against System Energy

System Energy’s operating revenues are derived from the allocation of the capacity, energy, and related costs associated with its 90% ownership/leasehold interest in Grand Gulf.  System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans pursuant to the Unit Power Sales Agreement. System Energy and the Unit Power Sales Agreement are currently the subject of several litigation proceedings at the FERC, including challenges with respect to System Energy’s authorized return on equity and capital structure, renewal of its sale-leaseback arrangement, treatment of uncertain tax positions, a broader investigation of rates under the Unit Power Sales Agreement, and a prudence complaint challenging the extended power uprate completed at Grand Gulf in 2012 and the operation and management of Grand Gulf, particularly in the 2016-2020 time period. The claims in these proceedings include claims for refunds and claims for rate adjustments; the aggregate amount of refunds claimed in these proceedings substantially exceeds the net book value of System Energy. Following are discussions of the proceedings.

Return on Equity and Capital Structure Complaints

In January 2017 the APSC and MPSC filed a complaint with the FERC against System Energy. The complaint seeks a reduction in the return on equity component of the Unit Power Sales Agreement pursuant to which System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. Entergy Arkansas also sells some of its Grand Gulf capacity and energy to Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under separate agreements. The current return on equity under the Unit Power Sales Agreement is 10.94%, which was established in a rate proceeding that became final in July 2001.

The APSC and MPSC complaint alleges that the return on equity is unjust and unreasonable because capital market and other considerations indicate that it is excessive. The complaint requests proceedings to investigate the return on equity and establish a lower return on equity, and also requests that the FERC establish January 23, 2017 as a refund effective date. The complaint includes return on equity analysis that purports to establish that the range of reasonable return on equity for System Energy is between 8.37% and 8.67%. System Energy answered the complaint in February 2017 and disputes that a return on equity of 8.37% to 8.67% is just and reasonable. The LPSC and the City Council intervened in the proceeding expressing support for the complaint. In September 2017 the FERC established a refund effective date of January 23, 2017 and directed the parties to engage in settlement proceedings before an ALJ. The parties were unable to settle the return on equity issue and a FERC hearing judge was assigned in July 2018. The 15-month refund period in connection with the APSC/MPSC complaint expired on April 23, 2018.

In April 2018 the LPSC filed a complaint with the FERC against System Energy seeking an additional 15-month refund period.  The LPSC complaint requests similar relief from the FERC with respect to System Energy’s return on equity and also requests the FERC to investigate System Energy’s capital structure.  The APSC, MPSC, and City Council intervened in the proceeding, filed an answer expressing support for the complaint, and asked the FERC to consolidate this proceeding with the proceeding initiated by the complaint of the APSC and MPSC in January 2017. System Energy answered the LPSC complaint in May 2018 and also filed a motion to dismiss the complaint. In August 2018 the FERC issued an order dismissing the LPSC’s request to investigate System Energy’s capital structure and setting for hearing the return on equity complaint, with a refund effective date of April 27, 2018. The 15-month refund period in connection with the LPSC return on equity complaint expired on July 26, 2019.

The portion of the LPSC’s complaint dealing with return on equity was subsequently consolidated with the APSC and MPSC complaint for hearing. The parties addressed an order (issued in a separate FERC proceeding involving New England transmission owners) that proposed modifying the FERC’s standard methodology for determining return on equity. In September 2018, System Energy filed a request for rehearing and the LPSC filed a request for rehearing or reconsideration of the FERC’s August 2018 order. The LPSC’s request referenced an
amended complaint that it filed on the same day raising the same capital structure claim the FERC had earlier dismissed. The FERC initiated a new proceeding for the amended capital structure complaint, and System Energy submitted a response in October 2018. In January 2019 the FERC set the amended complaint for settlement and hearing proceedings. Settlement proceedings in the capital structure proceeding commenced in February 2019. As noted below, in June 2019 settlement discussions were terminated and the amended capital structure complaint was consolidated with the ongoing return on equity proceeding. The 15-month refund period in connection with the capital structure complaint was from September 24, 2018 to December 23, 2019.

In January 2019 the LPSC and the APSC and MPSC filed direct testimony in the return on equity proceeding. For the refund period January 23, 2017 through April 23, 2018, the LPSC argues for an authorized return on equity for System Energy of 7.81% and the APSC and MPSC argue for an authorized return on equity for System Energy of 8.24%. For the refund period April 27, 2018 through July 27, 2019, and for application on a prospective basis, the LPSC argues for an authorized return on equity for System Energy of 7.97% and the APSC and MPSC argue for an authorized return on equity for System Energy of 8.41%. In March 2019, System Energy submitted answering testimony. For the first refund period, System Energy’s testimony argues for a return on equity of 10.10% (median) or 10.70% (midpoint). For the second refund period, System Energy’s testimony shows that the calculated returns on equity for the first period fall within the range of presumptively just and reasonable returns on equity, and thus the second complaint should be dismissed (and the first period return on equity used going forward). If the FERC nonetheless were to set a new return on equity for the second period (and going forward), System Energy argues the return on equity should be either 10.32% (median) or 10.69% (midpoint).

In May 2019 the FERC trial staff filed its direct and answering testimony in the return on equity proceeding. For the first refund period, the FERC trial staff calculates an authorized return on equity for System Energy of 9.89% based on the application of FERC’s proposed methodology. The FERC trial staff’s direct and answering testimony noted that an authorized return on equity of 9.89% for the first refund period was within the range of presumptively just and reasonable returns on equity for the second refund period, as calculated using a study period ending January 31, 2019 for the second refund period.

In June 2019, System Energy filed testimony responding to the testimony filed by the FERC trial staff. Among other things, System Energy’s testimony rebutted arguments raised by the FERC trial staff and provided updated calculations for the second refund period based on the study period ending May 31, 2019. For that refund period, System Energy’s testimony shows that strict application of the return on equity methodology proposed by the FERC staff indicates that the second complaint would not be dismissed, and the new return on equity would be set at 9.65% (median) or 9.74% (midpoint). System Energy’s testimony argues that these results are insufficient in light of benchmarks such as state returns on equity and treasury bond yields, and instead proposes that the calculated returns on equity for the second period should be either 9.91% (median) or 10.3% (midpoint). System Energy’s testimony also argues that, under application of its proposed modified methodology, the 10.10% return on equity calculated for the first refund period would fall within the range of presumptively just and reasonable returns on equity for the second refund period.

Also in June 2019, the FERC’s Chief ALJ issued an order terminating settlement discussions in the amended complaint addressing System Energy’s capital structure. The ALJ consolidated the amended capital structure complaint with the ongoing return on equity proceeding and set new procedural deadlines for the consolidated hearing.

In August 2019 the LPSC and the APSC and MPSC filed rebuttal testimony in the return on equity proceeding and direct and answering testimony relating to System Energy’s capital structure. The LPSC re-argues for an authorized return on equity for System Energy of 7.81% for the first refund period and 7.97% for the second refund period. The APSC and MPSC argue for an authorized return on equity for System Energy of 8.26% for the first refund period and 8.32% for the second refund period. With respect to capital structure, the LPSC proposes that the FERC establish a hypothetical capital structure for System Energy for ratemaking purposes. Specifically, the LPSC proposes that System Energy’s common equity ratio be set to Entergy Corporation’s equity ratio of 37%
equity and 63% debt. In the alternative, the LPSC argues that the equity ratio should be no higher than 49%, the composite equity ratio of System Energy and the other Entergy operating companies who purchase under the Unit Power Sales Agreement. The APSC and MPSC recommend that 35.98% be set as the common equity ratio for System Energy. As an alternative, the APSC and MPSC propose that System Energy’s common equity be set at 46.75% based on the median equity ratio of the proxy group for setting the return on equity.

In September 2019 the FERC trial staff filed its rebuttal testimony in the return on equity proceeding. For the first refund period, the FERC trial staff calculates an authorized return on equity for System Energy of 9.40% based on the application of the FERC’s proposed methodology and an updated proxy group. For the second refund period, based on the study period ending May 31, 2019, the FERC trial staff rebuttal testimony argues for a return on equity of 9.63%. In September 2019 the FERC trial staff also filed direct and answering testimony relating to System Energy’s capital structure. The FERC trial staff argues that the average capital structure of the proxy group used to develop System Energy’s return on equity should be used to establish the capital structure. Using this approach, the FERC trial staff calculates the average capital structure for its proposed proxy group of 46.74% common equity, and 53.26% debt.

In October 2019, System Energy filed answering testimony disputing the FERC trial staff’s, the LPSC’s, and the APSC’s and MPSC’s arguments for the use of a hypothetical capital structure and arguing that the use of System Energy’s actual capital structure is just and reasonable.

In November 2019, in a proceeding that did not involve System Energy, the FERC issued an order addressing the methodology for determining the return on equity applicable to transmission owners in MISO. Thereafter, the procedural schedule in the System Energy proceeding was amended to allow the participants to file supplemental testimony addressing the order in the MISO transmission owner proceeding (Opinion No. 569).

In February 2020 the LPSC, the MPSC and APSC, and the FERC trial staff filed supplemental testimony addressing Opinion No. 569 and how it would affect the return on equity evaluation for the two complaint periods concerning System Energy. For the first refund period, based on their respective interpretations and applications of the Opinion No. 569 methodology, the LPSC argues for an authorized return on equity for System Energy of 8.44%; the MPSC and APSC argue for an authorized return on equity of 8.41%; and the FERC trial staff argues for an authorized return on equity of 9.22%. For the second refund period and on a prospective basis, based on their respective interpretations and applications of the Opinion No. 569 methodology, the LPSC argues for an authorized return on equity for System Energy of 7.89%; the MPSC and APSC argue that an authorized return on equity of 8.01% may be appropriate; and the FERC trial staff argues for an authorized return on equity of 8.66%.

In April 2020, System Energy filed supplemental answering testimony addressing Opinion No. 569. System Energy argues that the Opinion No. 569 methodology is conceptually and analytically defective for purposes of establishing just and reasonable authorized return on equity determinations and proposes an alternative approach. As its primary recommendation, System Energy continues to support the return on equity determinations in its March 2019 testimony for the first refund period and its June 2019 testimony for the second refund period. Under the Opinion No. 569 methodology, System Energy calculates a “presumptively just and reasonable range” for the authorized return on equity for the first refund period of 8.57% to 9.52%, and for the second refund period of 8.28% to 9.11%. System Energy argues that these ranges are not just and reasonable results. Under its proposed alternative methodology, System Energy calculates an authorized return on equity of 10.26% for the first refund period, which also falls within the presumptively just and reasonable range calculated for the second refund period and prospectively.

In May 2020 the FERC issued an order on rehearing of Opinion No. 569 (Opinion No. 569-A). In June 2020 the procedural schedule in the System Energy proceeding was further revised in order to allow parties to address the Opinion No. 569-A methodology. Pursuant to the revised schedule, in June 2020, the LPSC, MPSC and APSC, and the FERC trial staff filed supplemental testimony addressing Opinion No. 569-A and how it would affect the return on equity evaluation for the two complaint periods concerning System Energy. For the first refund
period, based on their respective interpretations and applications of the Opinion No. 569-A methodology, the LPSC argues for an authorized return on equity for System Energy of 7.97%; the MPSC and APSC argue for an authorized return on equity of 9.24%; and the FERC trial staff argues for an authorized return on equity of 9.49%. For the second refund period and on a prospective basis, based on their respective interpretations and applications of the Opinion No. 569-A methodology, the LPSC argues for an authorized return on equity for System Energy of 7.78%; the MPSC and APSC argue that an authorized return on equity of 9.15% may be appropriate if the second complaint is not dismissed; and the FERC trial staff argues for an authorized return on equity of 9.09% if the second complaint is not dismissed.

Pursuant to the revised procedural schedule, in July 2020, System Energy filed supplemental testimony addressing Opinion No. 569-A. System Energy argues that strict application of the Opinion No. 569-A methodology produces results inconsistent with investor requirements and does not provide a sound basis on which to evaluate System Energy’s authorized return on equity. As its primary recommendation, System Energy argues for the use of a methodology that incorporates four separate financial models, including the constant growth form of the discounted cash flow model and the empirical capital asset pricing model. Based on application of its recommended methodology, System Energy argues for an authorized return on equity of 10.12% for the first refund period, which also falls within the presumptively just and reasonable range calculated for the second refund period and prospectively. Under the Opinion No. 569-A methodology, System Energy calculates an authorized return on equity of 9.44% for the first refund period, which also falls within the presumptively just and reasonable range calculated for the second refund period and prospectively.

The parties and FERC trial staff filed final rounds of testimony in August 2020. The hearing before a FERC ALJ occurred in late-September through early-October 2020, post-hearing briefing took place in November and December 2020.

In March 2021 the FERC ALJ issued an initial decision. With regard to System Energy’s authorized return on equity, the ALJ determined that the existing return on equity of 10.94% is no longer just and reasonable, and that the replacement authorized return on equity, based on application of the Opinion No. 569-A methodology, should be 9.32%. The ALJ further determined that System Energy should pay refunds for a fifteen-month refund period (January 2017-April 2018) based on the difference between the current return on equity and the replacement authorized return on equity. The ALJ determined that the April 2018 complaint concerning the authorized return on equity should be dismissed, and that no refunds for a second fifteen-month refund period should be due. With regard to System Energy’s capital structure, the ALJ determined that System Energy’s actual equity ratio is excessive and that the just and reasonable equity ratio is 48.15% equity, based on the average equity ratio of the proxy group used to evaluate the return on equity for the second complaint. The ALJ further determined that System Energy should pay refunds for a fifteen-month refund period (September 2018-December 2019) based on the difference between the actual equity ratio and the 48.15% equity ratio. If the ALJ’s initial decision is upheld, the estimated refund for this proceeding is approximately $60 million, which includes interest through December 31, 2021, and the estimated resulting annual rate reduction would be approximately $45 million. The estimated refund will continue to accrue interest until a final FERC decision is issued. Based on the course of the proceeding to date, System Energy has recorded a provision of $37 million, including interest, as of December 31, 2021.

The ALJ initial decision is an interim step in the FERC litigation process, and an ALJ’s determinations made in an initial decision are not controlling on the FERC. In April 2021, System Energy filed its brief on exceptions, in which it challenged the initial decision’s findings on both the return on equity and capital structure issues. Also in April 2021 the LPSC, APSC, MPSC, City Council, and the FERC trial staff filed briefs on exceptions. Reply briefs opposing exceptions were filed in May 2021 by System Energy, the FERC trial staff, the LPSC, APSC, MPSC, and the City Council. Refunds, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.
Grand Gulf Sale-leaseback Renewal Complaint and Uncertain Tax Position Rate Base Issue

In May 2018 the LPSC filed a complaint against System Energy and Entergy Services related to System Energy’s renewal of a sale-leaseback transaction originally entered into in December 1988 for an 11.5% undivided interest in Grand Gulf Unit 1. The complaint alleges that System Energy violated the filed rate and the FERC’s ratemaking and accounting requirements when it included in Unit Power Sales Agreement billings the cost of capital additions associated with the sale-leaseback interest, and that System Energy is double-recovering costs by including both the lease payments and the capital additions in Unit Power Sales Agreement billings. The complaint also claims that System Energy was imprudent in entering into the sale-leaseback renewal because the Utility operating companies that purchase Grand Gulf’s output from System Energy could have obtained cheaper capacity and energy in the MISO markets. The complaint further alleges that System Energy violated various other reporting and accounting requirements and should have sought prior FERC approval of the lease renewal. The complaint seeks various forms of relief from the FERC. The complaint seeks refunds for capital addition costs for all years in which they were recorded in allegedly non-formula accounts or, alternatively, the disallowance of the return on equity for the capital additions in those years plus interest. The complaint also asks that the FERC disallow and refund the lease costs of the sale-leaseback renewal on grounds of imprudence, investigate System Energy’s treatment of a DOE litigation payment, and impose certain forward-looking procedural protections, including audit rights for retail regulators of the Unit Power Sales Agreement formula rates. The APSC, MPSC, and City Council intervened in the proceeding.

In June 2018, System Energy and Entergy Services filed a motion to dismiss and an answer to the LPSC complaint denying that System Energy’s treatment of the sale-leaseback renewal and capital additions violated the terms of the filed rate or any other FERC ratemaking, accounting, or legal requirements or otherwise constituted double recovery. The response also argued that the complaint is inconsistent with a FERC-approved settlement to which the LPSC is a party and that explicitly authorizes System Energy to recover its lease payments. Finally, the response argued that both the capital additions and the sale-leaseback renewal were prudent investments and the LPSC complaint fails to justify any disallowance or refunds. The response also offered to submit formula rate protocols for the Unit Power Sales Agreement similar to the procedures used for reviewing transmission rates under the MISO tariff. In September 2018 the FERC issued an order setting the complaint for hearing and settlement proceedings. The FERC established a refund effective date of May 18, 2018.

In February 2019 the presiding ALJ ruled that the hearing ordered by the FERC includes the issue of whether specific subcategories of accumulated deferred income tax should be included in, or excluded from, System Energy’s formula rate. In March 2019 the LPSC, MPSC, APSC and City Council filed direct testimony. The LPSC testimony sought refunds that include the renewal lease payments (approximately $17.2 million per year since July 2015), rate base reductions for accumulated deferred income tax associated with uncertain tax positions, and the cost of capital additions associated with the sale-leaseback interest, as well as interest on those amounts.

In June 2019 System Energy filed answering testimony arguing that the FERC should reject all claims for refunds.  Among other things, System Energy argued that claims for refunds of the costs of lease renewal payments and capital additions should be rejected because those costs were recovered consistent with the Unit Power Sales Agreement formula rate, System Energy was not over or double recovering any costs, and ratepayers will save costs over the initial and renewal terms of the leases.  System Energy argued that claims for refunds associated with liabilities arising from uncertain tax positions should be rejected because the liabilities do not provide cost-free capital, the repayment timing of the liabilities is uncertain, and the outcome of the underlying tax positions is uncertain.  System Energy’s testimony also challenged the refund calculations supplied by the other parties.

In August 2019 the FERC trial staff filed direct and answering testimony seeking refunds for rate base reductions for liabilities associated with uncertain tax positions. The FERC trial staff also argued that System Energy recovered $32 million more than it should have in depreciation expense for capital additions. In September 2019, System Energy filed cross-answering testimony disputing the FERC trial staff’s arguments for refunds, stating that the FERC trial staff’s position regarding depreciation rates for capital additions is not unreasonable, but
explaining that any change in depreciation expense is only one element of a Unit Power Sales Agreement re-billing calculation. Adjustments to depreciation expense in any re-billing under the Unit Power Sales Agreement formula rate will also involve changes to accumulated depreciation, accumulated deferred income taxes, and other formula elements as needed. In October 2019 the LPSC filed rebuttal testimony increasing the amount of refunds sought for liabilities associated with uncertain tax positions.  The LPSC seeks approximately $512 million plus interest, which is approximately $216 million through December 31, 2021.  The FERC trial staff also filed rebuttal testimony in which it seeks refunds of a similar amount as the LPSC for the liabilities associated with uncertain tax positions.  The LPSC testimony also argued that adjustments to depreciation rates should affect rate base on a prospective basis only.

A hearing was held before a FERC ALJ in November 2019. In April 2020 the ALJ issued the initial decision. Among other things, the ALJ determined that refunds were due on three main issues. First, with regard to the lease renewal payments, the ALJ determined that System Energy is recovering an unjust acquisition premium through the lease renewal payments, and that System Energy’s recovery from customers through rates should be limited to the cost of service based on the remaining net book value of the leased assets, which is approximately $70 million. The ALJ found that the remedy for this issue should be the refund of lease payments (approximately $17.2 million per year since July 2015) with interest determined at the FERC quarterly interest rate, which would be offset by the addition of the net book value of the leased assets in the cost of service. The ALJ did not calculate a value for the refund expected as a result of this remedy. In addition, System Energy would no longer recover the lease payments in rates prospectively. Second, with regard to the liabilities associated with uncertain tax positions, the ALJ determined that the liabilities are accumulated deferred income taxes and that System Energy’s rate base should have been reduced for those liabilities. If the ALJ’s initial decision is upheld, the estimated refund for this issue through December 31, 2021, is approximately $422 million, plus interest, which is approximately $128 million through December 31, 2021. The ALJ also found that System Energy should include liabilities associated with uncertain tax positions as a rate base reduction going forward. Third, with regard to the depreciation expense adjustments, the ALJ found that System Energy should correct for the error in re-billings retroactively and prospectively, but that System Energy should not be permitted to recover interest on any retroactive return on enhanced rate base resulting from such corrections. If the initial decision is affirmed on this issue, System Energy estimates refunds of approximately $19 million, which includes interest through December 31, 2021.

The ALJ initial decision is an interim step in the FERC litigation process, and an ALJ’s determinations made in an initial decision are not controlling on the FERC. The ALJ in the initial decision acknowledges that these are issues of first impression before the FERC. In June 2020, System Energy, the LPSC, and the FERC trial staff filed briefs on exceptions, challenging several of the initial decision’s findings. System Energy’s brief on exceptions challenged the initial decision’s limitations on recovery of the lease renewal payments, its proposed rate base refund for the liabilities associated with uncertain tax positions, and its proposal to asymmetrically treat interest on bill corrections for depreciation expense adjustments. The LPSC’s and the FERC trial staff’s briefs on exceptions each challenged the initial decision’s allowance for recovery of the cost of service associated with the lease renewal based on the remaining net book value of the leased assets, its calculation of the remaining net book value of the leased assets, and the amount of the initial decision’s proposed rate base refund for the liabilities associated with uncertain tax positions. The LPSC’s brief on exceptions also challenged the initial decision’s proposal that depreciation expense adjustments include retroactive adjustments to rate base and its finding that section 203 of the Federal Power Act did not apply to the lease renewal. The FERC trial staff’s brief on exceptions also challenged the initial decision’s finding that the FERC need not institute a formal investigation into System Energy’s tariff. In October 2020, System Energy, the LPSC, the MPSC, the APSC, and the City Council filed briefs opposing exceptions. System Energy opposed the exceptions filed by the LPSC and the FERC trial staff. The LPSC, MPSC, APSC, City Council, and the FERC trial staff opposed the exceptions filed by System Energy. Also in October 2020 the MPSC, APSC, and the City Council filed briefs adopting the exceptions of the LPSC and the FERC trial staff. The case is pending before the FERC, which will review the case and issue an order on the proceeding, and the FERC may accept, reject, or modify the ALJ’s initial decision in whole or in part. Refunds, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.
In addition, in September 2020, the IRS issued a Notice of Proposed Adjustment (NOPA) and Entergy executed it. The NOPA memorializes the IRS’s decision to adjust the 2015 consolidated federal income tax return of Entergy Corporation and certain of its subsidiaries, including System Energy, with regard to the uncertain decommissioning tax position. Pursuant to the audit resolution documented in the NOPA, the IRS allowed System Energy’s inclusion of $102 million of future nuclear decommissioning costs in System Energy’s cost of goods sold for the 2015 tax year, roughly 10% of the requested deduction, but disallowed the balance of the position. In September 2020, System Energy filed a motion to lodge the NOPA into the record in the FERC proceeding. In October 2020 the LPSC, the APSC, the MPSC, the City Council, and the FERC trial staff filed oppositions to System Energy’s motion. As a result of the NOPA issued by the IRS in September 2020, System Energy filed, in October 2020, a new Federal Power Act section 205 filing at FERC to establish an ongoing rate base credit for the accumulated deferred income taxes resulting from the decommissioning uncertain tax position. On a prospective basis beginning with the October 2020 bill, System Energy proposes to include the accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position as a credit to rate base under the Unit Power Sales Agreement. In November 2020 the LPSC, APSC, MPSC, and City Council filed a protest to the filing, and System Energy responded.

In November 2020 the IRS issued a Revenue Agent’s Report (RAR) for the 2014/2015 tax year and in December 2020 Entergy executed it. The RAR contained the same adjustment to the uncertain nuclear decommissioning tax position as that which the IRS had announced in the NOPA. In December 2020, System Energy filed a motion to lodge the RAR into the record in the FERC proceeding addressing the uncertain tax position rate base issue. In January 2021 the LPSC, APSC, MPSC, and City Council filed a protest to the motion.

As a result of the RAR, in December 2020, System Energy filed amendments to its new Federal Power Act section 205 filings to establish an ongoing rate base credit for the accumulated deferred income taxes resulting from the decommissioning uncertain tax position and to credit excess accumulated deferred income taxes arising from the successful portion of the decommissioning uncertain tax position. The amendments both propose the inclusion of the RAR as support for the filings. In December 2020 the LPSC, APSC, and City Council filed a protest in response to the amendments, reiterating their prior objections to the filings. In February 2021 the FERC issued an order accepting System Energy’s Federal Power Act section 205 filings subject to refund, setting them for hearing, and holding the hearing in abeyance.

In December 2020, System Energy filed a new Federal Power Act section 205 filing to provide a one-time, historical credit of $25.2 million for the accumulated deferred income taxes that would have been created by the decommissioning uncertain tax position if the IRS’s decision had been known in 2016. In January 2021 the LPSC, APSC, MPSC, and City Council filed a protest to the filing. In February 2021 the FERC issued an order accepting System Energy’s Federal Power Act section 205 filing subject to refund, setting it for hearing, and holding the hearing in abeyance. The one-time credit was made during the first quarter 2021.

LPSC Authorization of Additional Complaints

In May 2020 the LPSC authorized its staff to file additional complaints at the FERC related to the rates charged by System Energy for Grand Gulf energy and capacity supplied to Entergy Louisiana under the Unit Power Sales Agreement. The LPSC directive notes that the initial decision issued by the presiding ALJ in the Grand Gulf sale-leaseback complaint proceeding did not address, for procedural reasons, certain rate issues raised by the LPSC and declined to order further investigation of rates charged by System Energy. The LPSC directive authorizes its staff to file complaints at the FERC “necessary to address these rate issues, to request a full investigation into the rates charged by System Energy for Grand Gulf power, and to seek rate refund, rate reduction, and such other remedies as may be necessary and appropriate to protect Louisiana ratepayers.” The LPSC directive further stated that the LPSC has seen “information suggesting that the Grand Gulf plant has been significantly underperforming compared to other nuclear plants in the United States, has had several extended and unexplained outages, and has been plagued with serious safety concerns.” The LPSC expressed concern that the costs paid by Entergy
Louisiana's retail customers may have been detrimentally impacted, and authorized “the filing of a FERC complaint to address these performance issues and to seek appropriate refund, rate reduction, and other remedies as may be appropriate.”

Unit Power Sales Agreement Complaint

The first of the additional complaints was filed by the LPSC, the APSC, the MPSC, and the City Council in September 2020. The complaint raises two sets of rate allegations: violations of the filed rate and a corresponding request for refunds for prior periods; and elements of the Unit Power Sales Agreement are unjust and unreasonable and a corresponding request for refunds for the 15-month refund period and changes to the Unit Power Sales Agreement prospectively. Several of the filed rate allegations overlap with the previous complaints. The filed rate allegations not previously raised are that System Energy: failed to provide a rate base credit to customers for the “time value” of sale-leaseback lease payments collected from customers in advance of the time those payments were due to the owner-lessors; improperly included certain lease refinancing costs in rate base as prepayments; improperly included nuclear decommissioning outage costs in rate base; failed to include categories of accumulated deferred income taxes as a reduction to rate base; charged customers based on a higher equity ratio than would be appropriate due to excessive retained earnings; and did not correctly reflect money pool investments and imprudently invested cash into the money pool. The elements of the Unit Power Sales Agreement that the complaint alleges are unjust and unreasonable include: incentive and executive compensation, lack of an equity re-opener, lobbying, and private airplane travel. The complaint also requests a rate investigation into the Unit Power Sales Agreement and System Energy’s billing practices pursuant to section 206 of the Federal Power Act, including any issue relevant to the Unit Power Sales Agreement and its inputs. System Energy filed its answer opposing the complaint in November 2020. In its answer, System Energy argued that all of the claims raised in the complaint should be dismissed and agreed that bill adjustment with respect to two discrete issues were justified. System Energy argued that dismissal is warranted because all claims fall into one or more of the following categories: the claims have been raised and are being litigated in another proceeding; the claims do not present a prima facie case and do not satisfy the threshold burden to establish a complaint proceeding; the claims are premised on a theory or request relief that is incompatible with federal law or FERC policy; the claims request relief that is inconsistent with the filed rate; the claims are barred or waived by the legal doctrine of laches; and/or the claims have been fully addressed and do not warrant further litigation. In December 2020, System Energy filed a bill adjustment report indicating that $3.4 million had been credited to customers in connection with the two discrete issues concerning the inclusion of certain accumulated deferred income taxes balances in rates. In January 2021 the complainants filed a response to System Energy’s November 2020 answer, and in February 2021, System Energy filed a response to the complainant’s response.

In May 2021 the FERC issued an order addressing the complaint, establishing a refund effective date of September 21, 2020, establishing hearing procedures, and holding those procedures in abeyance pending FERC’s review of the initial decision in the Grand Gulf sale-leaseback renewal complaint discussed above. System Energy agreed that the hearing should be held in abeyance but sought rehearing of FERC’s decision as related to matters set for hearing that were beyond the scope of FERC’s jurisdiction or authority. The complainants sought rehearing of FERC’s decision to hold the hearing in abeyance and filed a motion to proceed, which motion System Energy subsequently opposed. In June 2021, System Energy’s request for rehearing was denied by operation of law, and System Energy filed an appeal of FERC’s orders in the Court of Appeals for the Fifth Circuit. The appeal was initially stayed for a period of 90 days, but the stay expired. In November 2021 the Fifth Circuit dismissed the appeal as premature.

In August 2021 the FERC issued an order addressing System Energy’s and the complainants’ rehearing requests. The FERC dismissed part of the complaint seeking an equity re-opener, maintained the abeyance for issues related to the proceeding addressing the sale-leaseback renewal and uncertain tax positions, lifted the abeyance for issues unrelated to that proceeding, and clarified the scope of the hearing. A procedural schedule was established, with the hearing scheduled for June 2022 and the ALJ’s initial decision scheduled for November 2022. Discovery is ongoing.
In November 2021 the LPSC, APSC, and City Council filed direct testimony and requested the FERC to order refunds for prior periods and prospective amendments to the Unit Power Sales Agreement. The LPSC’s refund claims include, among other things, allegations that: (1) System Energy should not have included certain sale-leaseback transaction costs in prepayments; (2) System Energy should have credited rate base to reflect the time value of money associated with the advance collection of lease payments; (3) System Energy incorrectly included refueling outage costs that were recorded in account 174 in rate base; and (4) System Energy should have excluded several accumulated deferred income tax balances in account 190 from rate base. The LPSC is also seeking a retroactive adjustment to retained earnings and capital structure in conjunction with the implementation of its proposed refunds. In addition, the LPSC seeks amendments to the Unit Power Sales Agreement going forward to address below-the-line costs, incentive compensation, the working capital allowance, litigation expenses, and the 2019 termination of the capital funds agreement. The APSC argues that: (1) System Energy should have included borrowings from the Entergy System money pool in its determination of short-term debt in its cost of capital; and (2) System Energy should credit customers with System Energy’s allocation of earnings on money pool investments. The City Council alleges that System Energy has maintained excess cash on hand in the money pool and that retention of excess cash was imprudent. Based on this allegation, the City Council’s witness recommends a refund of approximately $98.8 million for the period 2004-September 2021 or other alternative relief. The City Council further recommends that the FERC impose a hypothetical equity ratio such as 48.15% equity to capital on a prospective basis.

In January 2022, System Energy filed answering testimony arguing that the FERC should not order refunds for prior periods or any prospective amendments to the Unit Power Sales Agreement. In response to the LPSC’s refund claims, System Energy argues, among other things, that (1) the inclusion of sale-leaseback transaction costs in prepayments was correct; (2) that the filed rate doctrine bars the request for a retroactive credit to rate base for the time value of money associated with the advance collection of lease payments; (3) that an accounting misclassification for deferred refueling outage costs has been corrected, caused no harm to customers, and requires no refunds; and (4) that its accounting and ratemaking treatment of specified accumulated deferred income tax balances in account 190 has been correct. System Energy further responds that no retroactive adjustment to retained earnings or capital structure should be ordered because there is no general policy requiring such a remedy and there was no showing that the retained earnings element of the capital structure was incorrectly implemented. Further, System Energy presented evidence that all of the costs that are being challenged were long known to the retail regulators and were approved by them for inclusion in retail rates, and the attempt to retroactively challenge these costs, some of which have been included in rates for decades, is unjust and unreasonable. In response to the LPSC’s proposed going-forward adjustments, System Energy presents evidence to show that none of the proposed adjustments are needed. On the issue of below-the-line expenses, during discovery procedures System Energy identified a historical allocation error in certain months and agreed to provide a bill credit to customers to correct the error. In response to the APSC’s claims, System Energy argues that the Unit Power Sales Agreement does not include System Energy’s borrowings from the Entergy System money pool or earnings on deposits to the Entergy System money pool in the determination of the cost of capital; and accordingly, no refunds are appropriate on those issues. In response to the City Council’s claims, System Energy argues that it has reasonably managed its cash and that the City Council’s theory of cash management is defective because it fails to adequately consider the relevant cash needs of System Energy and it makes faulty presumptions about the operation of the Entergy System money pool. System Energy further points out that the issue of its capital structure is already subject to pending FERC litigation.

Grand Gulf Prudence Complaint

The second of the additional complaints was filed at the FERC in March 2021 by the LPSC, the APSC, and the City Council against System Energy, Entergy Services, Entergy Operations, and Entergy Corporation. The second complaint contains two primary allegations. First, it alleges that, based on the plant’s capacity factor and alleged safety performance, System Energy and the other respondents imprudently operated Grand Gulf during the period 2016-2020, and it seeks refunds of at least $360 million in alleged replacement energy costs, in addition to other costs, including those that can only be identified upon further investigation. Second, it alleges that the
performance and/or management of the 2012 extended power uprate of Grand Gulf was imprudent, and it seeks refunds of all costs of the 2012 uprate that are determined to result from imprudent planning or management of the project. In addition to the requested refunds, the complaint asks that the FERC modify the Unit Power Sales Agreement to provide for full cost recovery only if certain performance indicators are met and to require pre-authorization of capital improvement projects in excess of $125 million before related costs may be passed through to customers in rates. In April 2021, System Energy and the other respondents filed their motion to dismiss and answer to the complaint. System Energy requested that the FERC dismiss the claims within the complaint. With respect to the claim concerning operations, System Energy argues that the complaint does not meet its legal burden because, among other reasons, it fails to allege any specific imprudent conduct. With respect to the claim concerning the uprate, System Energy argues that the complaint fails because, among other reasons, the complainants’ own conduct prevents them from raising a serious doubt as to the prudence of the uprate. System Energy also requests that the FERC dismiss other elements of the complaint, including the proposed modifications to the Unit Power Sales Agreement, because they are not warranted. Additional responsive pleadings were filed by the complainants and System Energy during the period from March through July 2021. The pleadings are pending FERC action.
Storm Cost Recovery Filings with Retail Regulators

Entergy Louisiana

Hurricane Laura, Hurricane Delta, Hurricane Zeta, Winter Storm Uri, and Hurricane Ida

In August 2020 and October 2020, Hurricane Laura, Hurricane Delta, and Hurricane Zeta caused significant damage to portions of Entergy Louisiana’s service area. The storms resulted in widespread outages, significant damage to distribution and transmission infrastructure, and the loss of sales during the outages. Additionally, as a result of Hurricane Laura’s extensive damage to the grid infrastructure serving the impacted area, large portions of the underlying transmission system required nearly a complete rebuild.

In October 2020, Entergy Louisiana filed an application at the LPSC seeking approval of certain ratemaking adjustments in connection with the issuance of shorter-term mortgage bonds to provide interim financing for restoration costs associated with Hurricane Laura, Hurricane Delta, and Hurricane Zeta. Subsequently, Entergy Louisiana and the LPSC staff filed a joint motion seeking approval to exclude from the derivation of Entergy Louisiana’s capital structure and cost rate of debt for ratemaking purposes, including the allowance for funds used during construction, shorter-term debt up to $1.1 billion issued by Entergy Louisiana to fund costs associated with Hurricane Laura, Hurricane Delta, and Hurricane Zeta costs on an interim basis. In November 2020 the LPSC issued an order approving the joint motion, and Entergy Louisiana issued $1.1 billion of 0.62% Series mortgage bonds due November 2023. Also in November 2020, Entergy Louisiana withdrew $257 million from its funded storm reserves.

In February 2021 two winter storms (collectively, Winter Storm Uri) brought freezing rain and ice to Louisiana. Ice accumulation sagged or downed trees, limbs and power lines, causing damage to Entergy Louisiana’s transmission and distribution systems. The additional weight of ice caused trees and limbs to fall into power lines and other electric equipment. When the ice melted, it affected vegetation and electrical equipment, causing additional outages. As discussed above in “Fuel and purchased power recovery,” Entergy Louisiana recovered the incremental fuel costs associated with Winter Storm Uri over a five-month period from April 2021 through August 2021.

In April 2021, Entergy Louisiana filed an application with the LPSC relating to Hurricane Laura, Hurricane Delta, Hurricane Zeta, and Winter Storm Uri restoration costs and in July 2021, Entergy Louisiana made a supplemental filing updating the total restoration costs. Total restoration costs for the repair and/or replacement of Entergy Louisiana’s electric facilities damaged by these storms are currently estimated to be approximately $2.06 billion, including approximately $1.68 billion in capital costs and approximately $380 million in non-capital
costs. Including carrying costs through January 2022, Entergy Louisiana is seeking an LPSC determination that $2.11 billion was prudently incurred and, therefore, is eligible for recovery from customers. Additionally, Entergy Louisiana is requesting that the LPSC determine that re-establishment of a storm escrow account to the previously authorized amount of $290 million is appropriate. In July 2021, Entergy Louisiana supplemented the application with a request regarding the financing and recovery of the recoverable storm restoration costs. Specifically, Entergy Louisiana requested approval to securitize its restoration costs pursuant to Louisiana Act 55 financing, as supplemented by Act 293 of the Louisiana Legislature’s Regular Session of 2021. As previously discussed, in August 2021, Hurricane Ida caused extensive damage to Entergy Louisiana’s distribution and, to a lesser extent, transmission systems resulting in widespread power outages. In September 2021, Entergy Louisiana supplemented the application with a request to establish and securitize a $1 billion restricted storm escrow account for Hurricane Ida related restoration costs, subject to a subsequent prudence review. In total, Entergy Louisiana requested authorization for the issuance of system restoration bonds in one or more series in an aggregate principal amount of $3.18 billion, which includes the costs of re-establishing and funding a storm damage escrow account, carrying costs and unamortized debt costs on interim financing, and issuance costs. After filing of testimony by LPSC staff and intervenors, which generally supported or did not oppose Entergy Louisiana’s requests, the parties negotiated and executed an uncontested stipulated settlement which was filed with the LPSC in February 2022. The settlement agreement contains the following key terms: $2.1 billion of restoration costs from Hurricane Laura, Hurricane Delta, Hurricane Zeta, and Winter Storm Uri were prudently incurred and are eligible for recovery; carrying costs of $51 million are recoverable; a $290 million cash storm reserve should be re-established; a $1 billion reserve should be established to partially pay for Hurricane Ida restoration costs; and Entergy Louisiana is authorized to finance $3.186 billion utilizing the securitization process authorized by Act 55, as supplemented by Act 293. The LPSC voted to approve the settlement at its February 2022 meeting.

Hurricane Isaac

In August 2012, Hurricane Isaac caused extensive damage to Entergy Louisiana’s service area.  In June 2014 the LPSC authorized Entergy Louisiana to utilize Louisiana Act 55 financing for Hurricane Isaac system restoration costs.  Entergy Louisiana committed to pass on to customers a minimum of $30.8 million of customer benefits through annual customer credits of approximately $6.2 million for five years. Approvals for the Act 55 financings were obtained from the Louisiana Utilities Restoration Corporation (LURC) and the Louisiana State Bond Commission.

In August 2014 the Louisiana Local Government Environmental Facilities and Community Development Authority (LCDA) issued $314.85 million in bonds under Louisiana Act 55.  From the $309 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $16 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $293 million directly to Entergy Louisiana.  Entergy Louisiana used the $293 million received from the LURC to acquire 2,935,152.69 Class C preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 7.5% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2014, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement. The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1.75 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

In the first quarter 2020, Entergy and the IRS agreed upon and settled on the treatment of funds received by Entergy Louisiana in conjunction with the Act 55 financing of Hurricane Isaac storm costs, which resulted in a net reduction of income tax expense of approximately $32 million. As a result of the settlement, the position was
partially sustained and Entergy Louisiana recorded a reduction of income tax expense of approximately $58 million primarily due to the reversal of liabilities for uncertain tax positions in excess of the agreed-upon settlement. Entergy recorded an increase to income tax expense of $26 million primarily resulting from the reduction of the deferred tax asset, associated with utilization of the net operating loss as a result of the settlement. This adjustment recorded by Entergy also accounted for the tax rate change of the Tax Cuts and Jobs Act. As a result of the IRS settlement, Entergy Louisiana recorded a $29 million ($21 million net-of-tax) regulatory charge and a corresponding regulatory liability to reflect its obligation to customers pursuant to the LPSC Hurricane Isaac Act 55 financing order.

Hurricane Gustav and Hurricane Ike

In September 2008, Hurricane Gustav and Hurricane Ike caused catastrophic damage to Entergy Louisiana’s service territory.  In December 2009, Entergy Louisiana entered into a stipulation agreement with the LPSC staff regarding its storm costs.  In March and April 2010, Entergy Louisiana and other parties to the proceeding filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal to utilize Act 55 financing, which included a commitment to pass on to customers a minimum of $43.3 million of customer benefits through a prospective annual rate reduction of $8.7 million for five years.  In April 2010 the LPSC approved the settlement and subsequently issued financing orders and a ratemaking order intended to facilitate the implementation of the Act 55 financings.  In June 2010 the Louisiana State Bond Commission approved the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricane Gustav and Hurricane Ike was reduced by $2.7 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2010 the LCDA issued two series of bonds totaling $713.0 million under Act 55.  From the $702.7 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $290 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $412.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana used $412.7 million to acquire 4,126,940.15 Class B preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 9% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2010, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA, and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

Hurricane Katrina and Hurricane Rita

In August and September 2005, Hurricanes Katrina and Rita caused catastrophic damage to Entergy Louisiana’s service territory. In March 2008, Entergy Louisiana and the LURC filed at the LPSC an application requesting that the LPSC grant a financing order authorizing the financing of Entergy Louisiana storm costs, storm reserves, and issuance costs pursuant to Louisiana Act 55.  Entergy Louisiana also filed an application requesting LPSC approval for ancillary issues including the mechanism to flow charges and savings to customers via a storm cost offset rider.  In April 2008 the Louisiana Public Facilities Authority (LPFA), which is the issuer of the bonds
pursuant to the Act 55 financing, approved requests for the Act 55 financing.  Also in April 2008, Entergy Louisiana and the LPSC staff filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal under the Act 55 financing, which included a commitment to pass on to customers a minimum of $40 million of customer benefits through a prospective annual rate reduction of $8 million for five years.  The LPSC subsequently approved the settlement and issued two financing orders and one ratemaking order intended to facilitate implementation of the Act 55 financing.  In May 2008 the Louisiana State Bond Commission granted final approval of the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricanes Katrina and Rita was reduced by $22.3 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2008 the LPFA issued $687.7 million in bonds under the aforementioned Act 55.  From the $679 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $152 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $527 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $545 million, including $17.8 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 5,449,861.85 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 10% annual distribution rate.  In August 2008 the LPFA issued $278.4 million in bonds under the aforementioned Act 55.  From the $274.7 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $87 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $187.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $189.4 million, including $1.7 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 1,893,918.39 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC that carry a 10% annual distribution rate.  Distributions are payable quarterly commencing on September 15, 2008 and have a liquidation price of $100 per unit.  The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.  

The bonds were repaid in 2018. Entergy and Entergy Louisiana did not report the bonds issued by the LPFA on their balance sheets because the bonds are the obligation of the LPFA, and there was no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collected a system restoration charge on behalf of the LURC and remitted the collections to the bond indenture trustee.  Entergy and Entergy Louisiana did not report the collections as revenue because Entergy Louisiana was merely acting as the billing and collection agent for the state.

Entergy Mississippi

Entergy Mississippi has approval from the MPSC to collect a storm damage provision of $1.75 million per month. If Entergy Mississippi’s accumulated storm damage provision balance exceeds $15 million, the collection of the storm damage provision ceases until such time that the accumulated storm damage provision becomes less than $10 million. Entergy Mississippi’s storm damage provision balance has been less than $10 million since May 2019, and Entergy Mississippi has been billing the monthly storm damage provision since July 2019.
Entergy New Orleans

Hurricane Zeta

In October 2020, Hurricane Zeta caused significant damage to Entergy New Orleans’s service area. The storm resulted in widespread power outages, significant damage to distribution and transmission infrastructure, and the loss of sales during the power outages. In March 2021, Entergy New Orleans withdrew $44 million from its funded storm reserves. In May 2021, Entergy New Orleans filed an application with the City Council requesting approval and certification that its system restoration costs associated with Hurricane Zeta of approximately $36 million, including approximately $28 million in capital costs and approximately $8 million in non-capital costs, were reasonable and necessary to enable Entergy New Orleans to restore electric service to its customers and Entergy New Orleans’s electric utility infrastructure.

Entergy Texas

Hurricane Laura, Hurricane Delta, and Winter Storm Uri

In August 2020 and October 2020, Hurricane Laura and Hurricane Delta caused extensive damage to Entergy Texas’s service area. In February 2021, Winter Storm Uri also caused damage to Entergy Texas’s service area. The storms resulted in widespread power outages, significant damage primarily to distribution and transmission infrastructure, and the loss of sales during the power outages. In April 2021, Entergy Texas filed an application with the PUCT requesting a determination that approximately $250 million of system restoration costs associated with Hurricane Laura, Hurricane Delta, and Winter Storm Uri, including approximately $200 million in capital costs and approximately $50 million in non-capital costs, were reasonable and necessary to enable Entergy Texas to restore electric service to its customers and Entergy Texas’s electric utility infrastructure. The filing also included the projected balance of approximately $13 million of a regulatory asset containing previously approved system restoration costs related to Hurricane Harvey. In September 2021 the parties filed an unopposed settlement agreement, pursuant to which Entergy Texas removed from the amount to be securitized approximately $4.3 million that will instead be charged to its storm reserve, $5 million related to no particular issue, of which Entergy Texas would be permitted to seek recovery in a future proceeding, and approximately $300 thousand related to attestation costs. In December 2021 the PUCT issued an order approving the unopposed settlement and determining system restoration costs of $243 million related to Hurricane Laura, Hurricane Delta, and Winter Storm Uri and the $13 million projected remaining balance of the Hurricane Harvey system restoration costs were eligible for securitization. The order also determines that Entergy Texas can recover carrying costs on the system restoration costs related to Hurricane Laura, Hurricane Delta, and Winter Storm Uri.

In July 2021, Entergy Texas filed with the PUCT an application for a financing order to approve the securitization of the system restoration costs that are the subject of the April 2021 application. In November 2021 the parties filed an unopposed settlement agreement supporting the issuance of a financing order consistent with Entergy Texas’s application and with minor adjustments to certain upfront and ongoing costs to be incurred to facilitate the issuance and serving of system restoration bonds. In January 2022 the PUCT issued a financing order consistent with the unopposed settlement.