Rate And Regulatory Matters
12 Months Ended
Dec. 31, 2017
Rate And Regulatory Matters
RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)
 
Regulatory Assets and Regulatory Liabilities

Regulatory assets represent probable future revenues associated with costs that Entergy expects to recover from customers through the regulatory ratemaking process under which the Utility business operates. Regulatory liabilities represent probable future reductions in revenues associated with amounts that Entergy expects to benefit customers through the regulatory ratemaking process under which the Utility business operates. In addition to the regulatory assets and liabilities that are specifically disclosed on the face of the balance sheets, the tables below provide detail of “Other regulatory assets” and “Other regulatory liabilities” that are included on Entergy’s and the Registrant Subsidiaries’ balance sheets as of December 31, 2017 and 2016:
 
Other Regulatory Assets

Entergy
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$2,642.3

 

$2,635.5

Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
746.0

 
677.2

Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 2 – Storm Cost Recovery Filings with Retail Regulators) (Note 5)
558.9

 
637.0

Removal costs - recovered through depreciation rates (Note 9) (a)
436.5

 
353.9

Opportunity Sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding)
109.8

 

Retail rate deferrals - recovered through rate riders as rates are redetermined by retail regulators
86.4

 
22.1

Unamortized loss on reacquired debt - recovered over term of debt
82.9

 
91.4

Little Gypsy costs – recovered through securitization (Note 5 – Entergy Louisiana Securitization Bonds - Little Gypsy)
73.7

 
100.0

Transition to competition costs - recovered over a 15-year period through February 2021
37.7

 
47.9

New nuclear generation development costs (Note 2 - New Nuclear Generation Development Costs) (b)
36.4

 
43.7

Other
125.1

 
161.2

Entergy Total

$4,935.7

 

$4,769.9



Entergy Arkansas
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$757.0

 

$786.6

Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
345.2

 
322.9

Removal costs - recovered through depreciation rates (Note 9) (a)
176.9

 
128.5

Opportunity sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding)
109.8

 

Storm damage costs - recovered either through securitization or retail rates (Note 5 - Entergy Arkansas Securitization Bonds)
76.2

 
88.9

Retail rate deferrals - recovered through rate riders as rates are redetermined annually
28.2

 
10.1

Unamortized loss on reacquired debt - recovered over term of debt
24.3

 
27.6

ANO Fukushima and Flood Barrier costs - recovered through retail rates through February 2026 (Note 2 - Retail Rate Proceedings) (b)
14.4

 
16.1

Lake Catherine 4 reliability and sustainability cost deferral - recovery through retail rates (b)
8.9

 
9.8

Incremental ice storm costs - recovered through 2032
7.4

 
7.9

MISO costs - recovery through retail rates through 2018 (Note 2 - Retail Rate Proceedings) (b)
5.5

 
11.1

Human capital management costs - recovery through retail rates through August 2019 (Note 2 - Retail Rate Proceedings) (b)
4.4

 
7.0

Other
9.2

 
11.5

Entergy Arkansas Total

$1,567.4

 

$1,428.0



Entergy Louisiana
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans and Non-Qualified Pension Plans) (a)

$724.6

 

$715.7

Asset Retirement Obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
218.6

 
199.4

Little Gypsy costs – recovered through securitization (Note 5 – Entergy Louisiana Securitization Bonds - Little Gypsy)
71.4

 
97.8

New nuclear generation development costs - recovery through formula rate plan beginning December 2014 through November 2022 (Note 2 - New Nuclear Generation Development Costs) (b)
35.8

 
43.1

Unamortized loss on reacquired debt - recovered over term of debt
24.7

 
27.0

Storm damage costs - recovered through retail rates (Note 2 - Storm Cost Recovery Filings with Retail Regulators)
14.3

 

Business combination external costs deferral - recovery through formula rate plan beginning December 2015 through November 2025 (b)
14.1

 
15.2

River Bend AFUDC - recovered through August 2025 (Note 1 – River Bend AFUDC)
12.9

 
14.8

Other
29.4

 
55.1

Entergy Louisiana Total

$1,145.8

 

$1,168.1



Entergy Mississippi
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$218.7

 

$217.2

Removal costs - recovered through depreciation rates (Note 9) (a)
91.6

 
82.0

Retail rate deferrals - recovered through rate riders as rates are redetermined annually
49.4

 
9.3

Unamortized loss on reacquired debt - recovered over term of debt
17.6

 
18.9

Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
7.6

 
7.2

Other
13.0

 
7.6

Entergy Mississippi Total

$397.9

 

$342.2



Entergy New Orleans
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$102.8

 

$108.8

Storm damage costs, including hurricane costs - recovered through retail rates and securitization (Note 2 - Storm Cost Recovery Filings with Retail Regulators)
82.3

 
93.6

Removal costs - recovered through depreciation rates (Note 9) (a)
44.8

 
40.1

Retail rate deferrals - recovered through rate riders as rates are redetermined monthly or annually
4.4

 
4.3

Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
4.3

 
4.2

Unamortized loss on reacquired debt - recovered over term of debt
3.0

 
3.4

Rate case costs - recovered over a 6-year period through September 2021 (Note 2 - Retail Rate Proceedings)
2.6

 
3.0

Michoud plant maintenance – recovered over a 7-year period through September 2018
1.4

 
3.3

Other
5.8

 
7.4

Entergy New Orleans Total

$251.4

 

$268.1



Entergy Texas
 
2017
 
2016
 
(In Millions)
Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 5 - Entergy Texas Securitization Bonds)

$386.1

 

$442.4

Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
169.2

 
201.7

Transition to competition costs - recovered over a 15-year period through February 2021
37.7

 
47.9

Removal costs - recovered through depreciation rates (Note 9) (a)
55.2

 
33.5

Unamortized loss on reacquired debt - recovered over term of debt
8.7

 
9.0

Other
4.5

 
5.7

Entergy Texas Total

$661.4

 

$740.2



System Energy
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans and Other Postretirement Benefits) (a)

$202.7

 

$193.5

Asset retirement obligation - recovery dependent upon timing of decommissioning (Note 9) (a)
169.1

 
142.5

Removal costs - recovered through depreciation rates (Note 9) (a)
67.9

 
69.7

Unamortized loss on reacquired debt - recovered over term of debt
4.6

 
5.5

System Energy Total

$444.3

 

$411.2



(a)
Does not earn a return on investment, but is offset by related liabilities.
(b)
Does not earn a return on investment.
Other Regulatory Liabilities

Entergy
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)

$989.3

 

$735.5

Vidalia purchased power agreement (Note 8) (b)
151.6

 
202.4

Louisiana Act 55 financing savings obligation (Note 2 - Storm Cost Recovery Filings with Retail Regulators) (b)
124.8

 
165.5

Grand Gulf sale-leaseback - (Note 10 - Sale and Leaseback Transactions)
67.9

 
67.9

Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates beginning December 2015 through November 2024 (Note 2 - Entergy Louisiana and Entergy Gulf States Louisiana Business Combination)
65.8

 
83.5

Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4

 
44.4

Asset retirement obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
36.7

 
32.7

Removal costs - returned to customers through depreciation rates (Note 9) (a)
32.4

 
53.9

Entergy Mississippis accumulated accelerated Grand Gulf amortization - amortized and credited through the Unit Power Sales Agreement
32.1

 
39.3

Waterford 3 replacement steam generator provision (Note 2 - Retail Rate Proceedings)

 
68.0

Other
43.5

 
79.8

Entergy Total

$1,588.5

 

$1,572.9


Entergy Arkansas
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)

$354.0

 

$280.8

Other
9.6

 
25.1

Entergy Arkansas Total

$363.6

 

$305.9



Entergy Louisiana
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)

$323.7

 

$235.4

Vidalia purchased power agreement (Note 8) (b)
151.6

 
202.4

Louisiana Act 55 financing savings obligation (Note 2 - Storm Cost Recovery Filings with Retail Regulators) (b)
124.8

 
165.5

Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates beginning December 2015 through November 2024 (Note 2 - Entergy Louisiana and Entergy Gulf States Louisiana Business Combination)
65.8

 
83.5

Gas hedging costs - refunded through fuel rates (Note 15 - Derivatives)

 
10.9

Asset Retirement Obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
36.7

 
32.7

Removal costs - returned to customers through depreciation rates (Note 9) (a)
32.4

 
53.9

Waterford 3 replacement steam generator provision (Note 2 - Retail Rate Proceedings)

 
68.0

Other
26.1

 
28.7

Entergy Louisiana Total

$761.1

 

$881.0



Entergy Texas
 
2017
 
2016
 
(In Millions)
Transition to competition costs - returned to customers through rate riders when rates are redetermined periodically

$4.8

 

$6.2

Other
2.1

 
2.3

Entergy Texas Total

$6.9

 

$8.5


System Energy
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 17) (a)

$311.6

 

$219.3

Grand Gulf sale-leaseback - (Note 10 - Sale and Leaseback Transactions)
67.9

 
67.9

Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4

 
44.4

Entergy Mississippis accumulated accelerated Grand Gulf amortization - amortized and credited through the Unit Power Sales Agreement
32.1

 
39.3

System Energy Total

$456.0

 

$370.9



(a)
Offset by related asset.
(b)
As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21% effective January 2018, the Vidalia purchased power agreement regulatory liability was reduced by $30.5 million and the Louisiana Act 55 financing savings obligation regulatory liabilities were reduced by $25.0 million, with corresponding increases to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

Regulatory activity regarding the Tax Cuts and Jobs Act

See the “Other Tax Matters - Tax Cuts and Jobs Act” section in Note 3 to the financial statements for discussion of the effects of the enactment of the Tax Cuts and Jobs Act, in December 2017, including its effects on Entergy’s and the Registrant Subsidiaries’ regulatory asset/liability for income taxes.

After enactment of the Tax Cuts and Jobs Act the APSC issued an order that applies to investor-owned utilities in Arkansas, including Entergy Arkansas. The order requests information regarding certain effects of the Tax Cuts and Jobs Act and requires the utilities to begin, effective January 1, 2018, to record regulatory liabilities to record the effects of the Act, subject to review by the APSC, although the order acknowledges that the exact amount of tax savings and rate reductions cannot be determined at this time. Entergy Arkansas requested clarification or, in the alternative, rehearing regarding the requirement to record a regulatory liability, and also responded to the request for information. In its request for clarification Entergy Arkansas sought clarification that the amount of any regulatory liability would be determined only after the utilities are heard and present evidence on the issue, as this otherwise would be arbitrary and could implicate single-issue and retroactive ratemaking. The APSC has not responded to the request for clarification. In its response to the APSC’s request for information Entergy Arkansas states that its formula rate plan rider already provides the means for customers to realize the benefits of the Act, except for the return of unprotected excess accumulated deferred income taxes. Entergy Arkansas’s next formula rate plan filing is scheduled for July 2018. Entergy Arkansas intends to return unprotected excess accumulated deferred income taxes as expeditiously as possible, subject to a subsequent request to be made by Entergy Arkansas and approval by the APSC.

After enactment of the Tax Cuts and Jobs Act the LPSC passed an agenda item requiring utilities, including Entergy Louisiana, to file reports regarding certain effects of the Act. Entergy Louisiana responded to the directive and stated in its response that it is working with the LPSC staff and other interested parties to extend its formula rate plan such that its next base rate change will occur effective September 2018, or it would file a base rate case. Entergy Louisiana went on to state that if the formula rate plan is extended Entergy Louisiana’s next adjustment of rates will reflect the new 21% federal corporate income tax rate. Entergy Louisiana stated that it is working with the LPSC staff and interested parties to determine when the tax rate reduction will be reflected in rates, along with when and how the excess accumulated deferred income taxes will be reflected in rates, and how certain tax sharing agreement customer credits will be adjusted. On February 21, 2018, the LPSC issued a special order requiring that all LPSC-jurisdictional utilities, beginning as of January 1, 2018, record as a regulatory liability (deferred liability) the amount required to reflect the reduction in the federal corporate income tax rate from 35% to 21% and the associated savings in excess accumulated deferred income taxes until such time as its rates are changed by the LPSC to reflect these federal tax savings. In the same special order, the LPSC also initiated a new rulemaking docket to consider these issues and the appropriate manner in which to flow through the benefits to Louisiana customers and to provide an opportunity for discovery and comments of jurisdictional utilities and other interested stakeholders. The rulemaking further requires the LPSC staff to report back to the LPSC as soon as practicable and preferably by the March 21, 2018, LPSC Business and Executive Session with recommendations as to how the federal tax-related benefits will be flowed through to Louisiana customers.

After enactment of the Tax Cuts and Jobs Act the MPSC ordered utilities, including Entergy Mississippi, that operate under a formula rate plan to file a description by February 26, 2018, of how the Act will be reflected in the formula rate plan under which the utility operates. In addition to the description that is due February 26, 2018, Entergy Mississippi’s formula rate plan 2018 test year filing is scheduled to be filed by March 15, 2018.

After enactment of the Tax Cuts and Jobs Act the City Council passed a resolution ordering Entergy New Orleans to, effective January 1, 2018, record deferred regulatory liabilities to account for the Act’s effect on Entergy New Orleans’s revenue requirement and to make a filing by mid-March 2018 regarding the Act’s effects on Entergy New Orleans’s operating income and rate base and potential mechanisms for customers to receive benefits of the Act. The resolution also directed Entergy New Orleans to request that Entergy Services file with the FERC for revisions of the Unit Power Sales Agreement and MSS-4 replacement tariffs to address the return of excess accumulated deferred income taxes. Entergy plans to make such filings with the FERC by the end of March 2018.
After enactment of the Tax Cuts and Jobs Act the PUCT issued an order requiring most utilities, including Entergy Texas, beginning January 25, 2018, to record a regulatory liability for the difference between revenues collected under existing rates and revenues that would have been collected had existing rates been set using the new federal income tax rates and also for the balance of excess accumulated deferred income taxes. The order also directs the PUCT staff to investigate each investor-owned utility on a case-by-case basis to determine the appropriate mechanism to adjust its rates to reflect the changes under the Act. In both a memorandum issued prior to the open meeting when the order was discussed and during the discussions at the open meeting discussing the order, the PUCT indicated that it would consider utility earnings in determining the treatment of the liability and the effects of the Act. Entergy Texas had previously provided information to the PUCT Staff in the docket and stated that it expects the PUCT to address the lower tax expense as part of Entergy Texas’s rate case expected to be filed in May 2018. Entergy Texas also stated that it would be inappropriate for the PUCT to require a refund of the reduction in income tax expense in 2018 resulting from the Act on a retroactive basis and without a comprehensive review of Entergy Texas’s cost of service and earned return on equity. In a subsequent order issued following the February 2018 open meeting, the PUCT clarified that carrying costs need not be recorded as part of the regulatory liability.

The Registrant Subsidiaries will continue to work with their respective regulators to determine the appropriate path forward in each jurisdiction regarding the effects of the Act.

Fuel and purchased power cost recovery

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas are allowed to recover fuel and purchased power costs through fuel mechanisms included in electric and gas rates that are recorded as fuel cost recovery revenues.  The difference between revenues collected and the current fuel and purchased power costs is generally recorded as “Deferred fuel costs” on the Utility operating companies’ financial statements.  The table below shows the amount of deferred fuel costs as of December 31, 2017 and 2016 that Entergy expects to recover (or return to customers) through fuel mechanisms, subject to subsequent regulatory review.
 
2017
 
2016
 
(In Millions)
Entergy Arkansas (a)

$130.4

 

$163.6

Entergy Louisiana (b)

$96.7

 

$119.9

Entergy Mississippi

$32.4

 

$7.0

Entergy New Orleans (b)

($3.7
)
 

$8.9

Entergy Texas

($67.3
)
 

($54.5
)

(a)
Includes $67.1 million in 2017 and $66.9 million in 2016 of fuel and purchased power costs, which do not currently earn a return on investment and whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.
(b)
Includes $168.1 million in each year for Entergy Louisiana and $4.1 million in each year for Entergy New Orleans of fuel, purchased power, and capacity costs, which do not currently earn a return on investment and whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.

Entergy Arkansas

Production Cost Allocation Rider

The APSC approved a production cost allocation rider for recovery from customers of the retail portion of the costs allocated to Entergy Arkansas as a result of the System Agreement proceedings, which are discussed in the “System Agreement Cost Equalization Proceedings” section below.  These costs cause an increase in Entergy Arkansas’s deferred fuel cost balance because Entergy Arkansas pays the costs over seven months but collects the costs from customers over twelve months.

In May 2014, Entergy Arkansas filed its annual redetermination of the production cost allocation rider to recover the $3 million unrecovered retail balance as of December 31, 2013 and the $67.8 million System Agreement bandwidth remedy payment made in May 2014 as a result of the compliance filing pursuant to the FERC’s February 2014 orders related to the bandwidth payments/receipts for the June - December 2005 period. In January 2015 the APSC issued an order approving Entergy Arkansas’s request for recovery of the $3 million under-recovered amount based on the true-up of the production cost allocation rider and the $67.8 million May 2014 System Agreement bandwidth remedy payment subject to refund with interest, with recovery of these payments concluding with the last billing cycle in December 2015. The APSC also found that Entergy Arkansas is entitled to carrying charges pursuant to the current terms of the production cost allocation rider. Entergy Arkansas made its compliance filing pursuant to the order in January 2015 and the APSC issued its approval order, also in January 2015. The redetermined rate went into effect with the first billing cycle of February 2015.

In May 2015, Entergy Arkansas filed its annual redetermination of the production cost allocation rider, which included a $38 million payment made by Entergy Arkansas as a result of the FERC’s February 2014 order related to the comprehensive bandwidth recalculation for calendar year 2006, 2007, and 2008 production costs. The redetermined rate for the 2015 production cost allocation rider update was added to the redetermined rate from the 2014 production cost allocation rider update and the combined rate was effective with the first billing cycle of July 2015. This combined rate was effective through December 2015. The collection of the remainder of the redetermined rate for the 2015 production cost allocation rider update continued through June 2016.

In May 2016, Entergy Arkansas filed its annual redetermination pursuant to the production cost allocation rider, which reflected recovery of the production cost allocation rider true-up adjustment of the 2014 and 2015 unrecovered retail balance in the amount of $1.9 million. Additionally, the redetermined rates reflected the recovery of a $1.9 million System Agreement bandwidth remedy payment resulting from a compliance filing pursuant to the FERC’s December 2015 order related to test year 2009 production costs. The rates for the 2016 production cost allocation rider update became effective with the first billing cycle of July 2016, and the rates were effective through June 2017.

In May 2017, Entergy Arkansas filed its annual redetermination pursuant to the production cost allocation rider, which reflected a credit amount of $0.3 million resulting from a compliance filing pursuant to the FERC’s September 2016 order. Additionally, the redetermined rate reflected recovery of the production cost allocation rider true-up adjustment of the 2016 unrecovered retail balance in the amount of $0.3 million. Because of the small effect of the 2017 production cost allocation rider update, Entergy Arkansas proposed to reduce the effective period of the update to one month, July 2017. After the one month collection period, rates were set to zero for all rate classes for the period August 2017 through June 2018.

Energy Cost Recovery Rider

Entergy Arkansas’s retail rates include an energy cost recovery rider to recover fuel and purchased energy costs in monthly customer bills.  The rider utilizes the prior calendar-year energy costs and projected energy sales for the twelve-month period commencing on April 1 of each year to develop an energy cost rate, which is redetermined annually and includes a true-up adjustment reflecting the over- or under-recovery, including carrying charges, of the energy costs for the prior calendar year.  The energy cost recovery rider tariff also allows an interim rate request depending upon the level of over- or under-recovery of fuel and purchased energy costs.

In January 2014, Entergy Arkansas filed a motion with the APSC relating to its redetermination of its energy cost rate that was subsequently filed in March 2014. In that motion, Entergy Arkansas requested that the APSC authorize Entergy Arkansas to exclude $65.9 million of deferred fuel and purchased energy costs incurred in 2013 from the redetermination of its 2014 energy cost rate. The $65.9 million is an estimate of the incremental fuel and replacement energy costs that Entergy Arkansas incurred as a result of the ANO stator incident. Entergy Arkansas requested that the APSC authorize Entergy Arkansas to retain that amount in its deferred fuel balance, with recovery to be reviewed in a later period after more information is available regarding various claims associated with the ANO stator incident. The APSC approved Entergy Arkansas’s request in February 2014. In July 2017, Entergy Arkansas filed for a change in rates pursuant to its formula rate plan rider. In that docket, the APSC approved a settlement agreement agreed upon by the parties, including a provision that requires Entergy Arkansas to initiate a docket for the purpose of recovering funds currently withheld from rates and related to the stator incident, including the $65.9 million of deferred fuel and purchased energy costs previously noted, subject to certain timelines and conditions set forth in the settlement agreement. See the “ANO Damage, Outage, and NRC Reviews” section in Note 8 to the financial statements for further discussion of the ANO stator incident.

In March 2017, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01164 per kWh to $0.01547 per kWh. The APSC staff filed testimony in March 2017 recommending that the redetermined rate be implemented with the first billing cycle of April 2017 under the normal operation of the tariff. Accordingly, the redetermined rate went into effect on March 31, 2017 pursuant to the tariff. In July 2017 the Arkansas Attorney General requested additional information to support certain of the costs included in Entergy Arkansas’s 2017 energy cost rate redetermination.

Entergy Louisiana

Entergy Louisiana recovers electric fuel and purchased power costs for the billing month based upon the level of such costs incurred two months prior to the billing month. Entergy Louisiana’s purchased gas adjustments include estimates for the billing month adjusted by a surcharge or credit that arises from an annual reconciliation of fuel costs incurred with fuel cost revenues billed to customers, including carrying charges.

In April 2010 the LPSC authorized its staff to initiate an audit of Entergy Louisiana’s fuel adjustment clause filings.  The audit included a review of the reasonableness of charges flowed through the fuel adjustment clause by Entergy Louisiana for the period from 2005 through 2009.  The LPSC staff issued its audit report in January 2013.  The LPSC staff recommended that Entergy Louisiana refund approximately $1.9 million, plus interest, to customers and realign the recovery of approximately $1 million from Entergy Louisiana’s fuel adjustment clause to base rates.  The recommended refund was made by Entergy Louisiana in May 2013 in the form of a credit to customers through its fuel adjustment clause filing. In October 2016 the LPSC staff filed testimony affirming the recommendation in its audit report on the lone remaining issue that nuclear dry fuel storage costs should be realigned to base rates. The parties agreed to remove that remaining issue to a separate docket because the same issue was outstanding in the Entergy Gulf States Louisiana audit for the same time period. In November 2016 the LPSC approved the resolution of this audit and the creation of a new docket for the resolution of the proper method of recovery for nuclear dry fuel storage costs. In December 2016 the LPSC opened a new docket in order to resolve the issue regarding the proper methodology for the recovery of nuclear dry fuel storage costs. In October 2017 the LPSC approved the continued recovery of the nuclear dry fuel storage costs through the fuel adjustment clause, resolving the open issue in the audit.

In December 2011 the LPSC authorized its staff to initiate a proceeding to audit the fuel adjustment clause filings of Entergy Gulf States Louisiana and its affiliates.  The audit included a review of the reasonableness of charges flowed by Entergy Gulf States Louisiana through its fuel adjustment clause for the period 2005 through 2009.  In March 2016 the LPSC staff consultant issued its audit report. In its report, the LPSC staff consultant recommended that Entergy Louisiana refund approximately $8.6 million, plus interest, to customers and realign the recovery of approximately $12.7 million from Entergy Gulf States Louisiana’s fuel adjustment clause to base rates. In September 2016 the LPSC staff filed testimony stating that it was no longer recommending a disallowance of $3.4 million of the $8.6 million discussed above, but otherwise maintained positions from its report. Subsequently, the parties entered into a settlement, which was approved by the LPSC in November 2016. The settlement recognized the dry cask storage recovery method issue, which was addressed in the separate proceeding approved by the LPSC in October 2017, provided for a refund of $5 million, which was made to legacy Entergy Gulf States Louisiana customers in December 2016, and resolved all other issues raised in the audit.
In July 2014 the LPSC authorized its staff to initiate an audit of Entergy Gulf States Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed by Entergy Gulf States Louisiana through its fuel adjustment clause for the period from 2010 through 2013. Discovery commenced in July 2015. No report of audit has been issued.

In July 2014 the LPSC authorized its staff to initiate an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed by Entergy Louisiana through its fuel adjustment clause for the period from 2010 through 2013. Discovery commenced in July 2015. No report of audit has been issued.

In June 2016 the LPSC staff provided notice of audits of Entergy Louisiana’s fuel adjustment clause filings and purchased gas adjustment clause filings. In recognition of the business combination that occurred in 2015, the audit notice was issued to Entergy Louisiana and will also include a review of charges to legacy Entergy Gulf States Louisiana customers prior to the business combination. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s fuel adjustment clause for the period from 2014 through 2015 and charges flowed through Entergy Louisiana’s purchased gas adjustment clause for the period from 2012 through 2015. Discovery commenced in March 2017. No report of audit has been issued.

Due to higher fuel costs for the operating month of January 2018 resulting in part from recent cold weather, higher Henry Hub prices, and an increase in total fuel and purchased power costs, Entergy Louisiana plans to cap the average fuel adjustment charge to be billed in March 2018 at $0.03060 per kWh and to defer billing of all fuel costs in excess of the capped amounts by including such costs in the over- or under-recovery account.

Entergy Mississippi

Entergy Mississippi’s rate schedules include an energy cost recovery rider that is adjusted annually to reflect accumulated over- or under-recoveries.  Entergy Mississippi’s fuel cost recoveries are subject to annual audits conducted pursuant to the authority of the MPSC.

Entergy Mississippi had a deferred fuel over-recovery balance of $58.3 million as of May 31, 2015, along with an under-recovery balance of $12.3 million under the power management rider. Pursuant to those tariffs, in July 2015, Entergy Mississippi filed for interim adjustments under both the energy cost recovery rider and the power management rider to flow through to customers the approximately $46 million net over-recovery over a six-month period. In August 2015, the MPSC approved the interim adjustments effective with September 2015 bills. In November 2015, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included a projected over-recovery balance of $48 million projected through January 31, 2016. In January 2016 the MPSC approved the redetermined annual factor effective February 1, 2016. The MPSC further ordered, however, that due to the significant change in natural gas price forecasts since Entergy Mississippi’s filing in November 2015 Entergy Mississippi should file a revised fuel factor with the MPSC no later than February 1, 2016. Pursuant to that order, Entergy Mississippi submitted a revised fuel factor. Additionally, because Entergy Mississippi’s projected over-recovery balance for the period ending January 31, 2016 was $68 million, in February 2016, Entergy Mississippi filed for another interim adjustment to the energy cost factor effective April 2016 to flow through to customers the projected over-recovery balance over a six-month period. That interim adjustment was approved by the MPSC in February 2016 effective for April 2016 bills.

In November 2016, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an over-recovery of less than $2 million as of September 30, 2016. In January 2017 the MPSC approved the annual factor effective with February 2017 bills. Also in January 2017 the MPSC certified to the Mississippi Legislature the audit reports of its independent auditors for the fuel year ending September 30, 2016. In its order, the MPSC expressly reserved the right to review and determine the recoverability of any and all purchased power expenditures made during fiscal year 2016. The MPSC hired independent auditors to conduct an annual operations audit and a financial audit. The independent auditors issued their audit reports in December 2017. The audit reports included several recommendations for action by Entergy Mississippi but did not recommend any cost disallowances. In January 2018 the MPSC certified the audit reports to the Mississippi Legislature. In November 2017 the Public Utilities Staff separately engaged a consultant to review the outage at the Grand Gulf Nuclear Station that began in 2016. The review is currently in progress.

In November 2017, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an under-recovery of approximately $61.5 million as of September 30, 2017. Entergy Mississippi proposed a two-tiered energy cost factor designed to promote overall rate stability throughout 2018 particularly during the summer months. In January 2018 the MPSC approved the proposed energy cost factors effective for February 2018 bills.

Mississippi Attorney General Complaint

The Mississippi attorney general filed a complaint in state court in December 2008 against Entergy Corporation, Entergy Mississippi, Entergy Services, and Entergy Power alleging, among other things, violations of Mississippi statutes, fraud, and breach of good faith and fair dealing, and requesting an accounting and restitution.  The complaint is wide ranging and relates to tariffs and procedures under which Entergy Mississippi purchases power not generated in Mississippi to meet electricity demand.  Entergy believes the complaint is unfounded.  In December 2008 the defendant Entergy companies removed the Attorney General’s lawsuit to U.S. District Court in Jackson, Mississippi.  The Mississippi attorney general moved to remand the matter to state court.  In August 2012 the District Court issued an opinion denying the Attorney General’s motion for remand, finding that the District Court has subject matter jurisdiction under the Class Action Fairness Act.

The defendant Entergy companies answered the complaint and filed a counterclaim for relief based upon the Mississippi Public Utilities Act and the Federal Power Act.  In May 2009 the defendant Entergy companies filed a motion for judgment on the pleadings asserting grounds of federal preemption, the exclusive jurisdiction of the MPSC, and factual errors in the Attorney General’s complaint.  In September 2012 the District Court heard oral argument on Entergy’s motion for judgment on the pleadings.

In January 2014 the U.S. Supreme Court issued a decision in which it held that cases brought by attorneys general as the sole plaintiff to enforce state laws were not considered “mass actions” under the Class Action Fairness Act, so as to establish federal subject matter jurisdiction. One day later the Attorney General renewed his motion to remand the Entergy case back to state court, citing the U.S. Supreme Court’s decision. The defendant Entergy companies responded to that motion reiterating the additional grounds asserted for federal question jurisdiction, and the District Court held oral argument on the renewed motion to remand in February 2014. In April 2015 the District Court entered an order denying the renewed motion to remand, holding that the District Court has federal question subject matter jurisdiction. The Attorney General appealed to the U.S. Fifth Circuit Court of Appeals the denial of the motion to remand. In July 2015 the Fifth Circuit issued an order denying the appeal, and the Attorney General subsequently filed a petition for rehearing of the request for interlocutory appeal, which was also denied. In December 2015 the District Court ordered that the parties submit to the court undisputed and disputed facts that are material to the Entergy defendants’ motion for judgment on the pleadings, as well as supplemental briefs regarding the same. Those filings were made in January 2016.

In September 2016 the Attorney General filed a mandamus petition with the U.S. Fifth Circuit Court of Appeals in which the Attorney General asked the Fifth Circuit to order the chief judge to reassign this case to another judge. In September 2016 the District Court denied the Entergy companies’ motion for judgment on the pleadings. The Entergy companies filed a motion seeking to amend the District Court’s order denying the Entergy companies’ motion for judgment on the pleadings and allowing an interlocutory appeal. In October 2016 the Fifth Circuit granted the Attorney General’s motion for writ of mandamus and directed the chief judge to assign the case to a new judge. The case was reassigned in October 2016. In January 2017 the District Court denied the Entergy companies’ motion to amend the order denying the motion for judgment on the pleadings. In June 2017 the District Court issued a case management order setting a trial date in November 2018. Discovery is currently in progress.
Entergy New Orleans

Entergy New Orleans’s electric rate schedules include a fuel adjustment tariff designed to reflect no more than targeted fuel and purchased power costs, adjusted by a surcharge or credit for deferred fuel expense arising from the monthly reconciliation of actual fuel and purchased power costs incurred with fuel cost revenues billed to customers, including carrying charges.
 
Entergy New Orleans’s gas rate schedules include a purchased gas adjustment to reflect estimated gas costs for the billing month, adjusted by a surcharge or credit similar to that included in the electric fuel adjustment clause, including carrying charges.

Due to higher fuel costs associated in part with the extended Grand Gulf outage and the partially simultaneous Union Power Block 1 planned outage, for the December 2016, January 2017, and February 2017 billing months, the City Council authorized Entergy New Orleans to cap the fuel adjustment charge billed to customers at $0.035 per kWh and to defer billing of all fuel costs in excess of the capped amount by including such costs in the over- or under-recovery account.

Due to higher fuel costs for the operating month of January 2018 resulting in part from recent cold weather, higher Henry Hub prices, and an increase in total fuel and purchased power costs associated in part with certain plant outages, Entergy New Orleans has proposed to cap the fuel adjustment charge to be billed in March 2018 to non-transmission Entergy New Orleans legacy customers and Entergy New Orleans Algiers customers at $0.035323 per kWh and $0.025446 per kWh, respectively. Entergy New Orleans has also proposed to cap the fuel adjustment charge to be billed in March 2018 for Entergy New Orleans legacy transmission customers at $0.034609 per kWh and to defer billing of all fuel costs in excess of the capped amount by including such costs in the over- or under-recovery account.

Entergy Texas

Entergy Texas’s rate schedules include a fixed fuel factor to recover fuel and purchased power costs, including interest, not recovered in base rates.   Semi-annual revisions of the fixed fuel factor are made in March and September based on the market price of natural gas and changes in fuel mix.  The amounts collected under Entergy Texas’s fixed fuel factor and any interim surcharge or refund are subject to fuel reconciliation proceedings before the PUCT.
        
In August 2014, Entergy Texas filed an application seeking PUCT approval to implement an interim fuel refund of approximately $24.6 million for over-collected fuel costs incurred during the months of November 2012 through April 2014. This refund resulted from (i) applying $48.6 million in bandwidth remedy payments that Entergy Texas received in May 2014 related to the June - December 2005 period to Entergy Texas’s $8.7 million under-recovered fuel balance as of April 30, 2014 and (ii) netting that fuel balance against the $15.3 million bandwidth remedy payment that Entergy Texas made related to calendar year 2013 production costs. Also in August 2014, Entergy Texas filed an unopposed motion for interim rates to implement these refunds for most customers over a two-month period commencing with September 2014. The PUCT issued its order approving the interim relief in August 2014 and Entergy Texas completed the refunds in October 2014. Parties intervened in this matter, and all parties agreed that the proceeding should be bifurcated such that the proposed interim refund would become final in a separate proceeding, which refund was approved by the PUCT in March 2015.   In July 2015 certain parties filed briefs in the open proceeding asserting that Entergy Texas should refund to retail customers an additional $10.9 million in bandwidth remedy payments Entergy Texas received related to calendar year 2006 production costs.  In October 2015 an ALJ issued a proposal for decision recommending that the additional $10.9 million in bandwidth remedy payments be refunded to retail customers. In January 2016 the PUCT issued its order affirming the ALJ’s recommendation, and Entergy Texas filed a motion for rehearing of the PUCT’s decision, which the PUCT denied. In March 2016, Entergy Texas filed a complaint in Federal District Court for the Western District of Texas and a petition in the Travis County (State) District Court appealing the PUCT’s decision. The pending appeals did not stay the PUCT’s decision. In April 2016, Entergy Texas filed with the PUCT an application to refund to customers approximately $56.2 million. The refund resulted from (i) $41.8 million of fuel cost recovery over-collections through February 2016, (ii) the $10.9 million in bandwidth remedy payments, discussed above, that Entergy Texas received related to calendar year 2006 production costs, and (iii) $3.5 million in bandwidth remedy payments that Entergy Texas received related to 2006-2008 production costs. In June 2016, Entergy Texas filed an unopposed settlement agreement that added additional over-recovered fuel costs for the months of March and April 2016. The settlement resulted in a $68 million refund. The ALJ approved the refund on an interim basis to be made to most customers over a four-month period beginning with the first billing cycle of July 2016. In July 2016 the PUCT issued an order approving the interim refund. The federal appeal of the PUCT’s January 2016 decision was heard in December 2016, and the Federal District Court granted Entergy Texas’s requested relief. In January 2017 the PUCT and an intervenor filed petitions for appeal to the U.S. Court of Appeals for the Fifth Circuit of the Federal District Court ruling. Oral argument was held before the U.S. Court of Appeals for the Fifth Circuit in February 2018, and a decision is pending. The State District Court appeal of the PUCT’s January 2016 decision also remains pending.

In July 2016, Entergy Texas filed an application to reconcile its fuel and purchased power costs for the period April 1, 2013 through March 31, 2016. Under a recent PUCT rule change, a fuel reconciliation is required to be filed at least once every three years and outside of a base rate case filing. During the reconciliation period, Entergy Texas incurred approximately $1.77 billion in Texas jurisdictional eligible fuel and purchased power expenses, net of certain revenues credited to such expenses and other adjustments. Entergy Texas estimated an over-recovery balance of approximately $19.3 million, including interest, which Entergy Texas requested authority to carry over as the beginning balance for the subsequent reconciliation period beginning Apri1 2016. Entergy Texas also noted, however, that the estimated $19.3 million over collection was being refunded to customers as a portion of the interim fuel refund beginning with the first billing cycle of July 2016, discussed above. Entergy Texas also requested a prudence finding for each of the fuel-related contracts and arrangements entered into or modified during the reconciliation period that have not been reviewed by the PUCT in a prior proceeding. In December 2016, Entergy Texas entered into a stipulation and settlement agreement resulting in a $6 million disallowance not associated with any particular issue raised and a refund of the over-recovery balance of $21 million as of November 30, 2016, to most customers beginning April 2017 through June 2017. This settlement was developed concurrently with the stipulation and settlement agreement in the 2016 transmission cost recovery factor rider amendment discussed below, and the terms and conditions in both settlements are interdependent. The fuel reconciliation settlement was approved by the PUCT in March 2017 and the refunds were made.

In June 2017, Entergy Texas filed an application for a fuel refund of approximately $30.7 million for the months of December 2016 through April 2017. For most customers, the refunds flowed through bills for the months of July 2017 through September 2017. The fuel refund was approved by the PUCT in August 2017.

In December 2017, Entergy Texas filed an application for a fuel refund of approximately $30.5 million for the months of May 2017 through October 2017. Also in December 2017, the PUCT’s ALJ approved the refund on an interim basis. For most customers, the refunds flowed through bills beginning January 2018 and will continue through March 2018. A final decision in this matter remains pending.
    
Retail Rate Proceedings

Filings with the APSC (Entergy Arkansas)

Retail Rates

2015 Base Rate Filing
 
In April 2015, Entergy Arkansas filed with the APSC for a general change in rates, charges, and tariffs. The filing notified the APSC of Entergy Arkansas’s intent to implement a forward test year formula rate plan pursuant to Arkansas legislation passed in 2015, and requested a retail rate increase of $268.4 million, with a net increase in revenue of $167 million. The filing requested a 10.2% return on common equity. In September 2015 the APSC staff and intervenors filed direct testimony, with the APSC staff recommending a revenue requirement of $217.9 million and a 9.65% return on common equity. In December 2015, Entergy Arkansas, the APSC staff, and certain of the intervenors in the rate case filed with the APSC a joint motion for approval of a settlement of the case that proposed a retail rate increase of approximately $225 million with a net increase in revenue of approximately $133 million; an authorized return on common equity of 9.75%; and a formula rate plan tariff that provides a +/- 50 basis point band around the 9.75% allowed return on common equity. A significant portion of the rate increase is related to Entergy Arkansas’s acquisition in March 2016 of Union Power Station Power Block 2 for a base purchase price of $237 million. The settlement agreement also provided for amortization over a 10-year period of $7.7 million of previously-incurred costs related to ANO post-Fukushima compliance and $9.9 million of previously-incurred costs related to ANO flood barrier compliance. A settlement hearing was held in January 2016. In February 2016 the APSC approved the settlement with one exception that reduced the retail rate increase proposed in the settlement by $5 million. The settling parties agreed to the APSC modifications in February 2016. The new rates were effective February 24, 2016 and began billing with the first billing cycle of April 2016. In March 2016, Entergy Arkansas made a compliance filing regarding the new rates that included an interim base rate adjustment surcharge, effective with the first billing cycle of April 2016, to recover the incremental revenue requirement for the period February 24, 2016 through March 31, 2016. The interim base rate adjustment surcharge was designed to recover a total of $21.1 million over the nine-month period from April 2016 through December 2016.

2016 Formula Rate Plan Filing
    
In July 2016, Entergy Arkansas filed with the APSC its 2016 formula rate plan filing showing Entergy Arkansas’s projected earned return on common equity for the twelve months ended December 31, 2017 test period to be below the formula rate plan bandwidth. The filing requested a $67.7 million revenue requirement increase to achieve Entergy Arkansas’s target earned return on common equity of 9.75%. In October 2016, Entergy Arkansas filed with the APSC revised formula rate plan attachments with an updated request for a $54.4 million revenue requirement increase based on acceptance of certain adjustments and recommendations made by the APSC staff and other intervenors, as well as three additional adjustments identified as appropriate by Entergy Arkansas. In November 2016 a hearing was held and the APSC issued an order directing the parties to brief certain issues. In December 2016 the APSC approved the settlement agreement and the $54.4 million revenue requirement increase with approximately $25 million of the $54.4 million revenue requirement subject to possible future adjustment and refund to customers with interest. The APSC requested supplemental information for some of Entergy Arkansas’s requested nuclear expenditures. In December 2016 the APSC approved Entergy Arkansas’s formula rate plan compliance tariff, and the rates became effective with the first billing cycle of January 2017. In April 2017, Entergy Arkansas filed a motion consented to by all parties requesting that it be permitted to submit the supplemental information requested by the APSC in conjunction with its 2017 formula rate plan filing, which was subsequently made in July 2017 and is discussed below. In May 2017 the APSC approved the joint motion and proposal to review Entergy Arkansas’s supplemental information on a concurrent schedule with the 2017 formula rate plan filing. In October 2017, Entergy Arkansas and the parties to the proceeding filed a joint motion to approve a unanimous settlement agreement resolving all issues in the docket and providing for recovery of the 2017 and 2018 nuclear costs. In December 2017 the APSC approved the settlement agreement and recovery of the 2017 and 2018 nuclear costs.

2017 Formula Rate Plan Filing

In July 2017, Entergy Arkansas filed with the APSC its 2017 formula rate plan filing showing Entergy Arkansas’s projected earned return on common equity for the twelve months ended December 31, 2018 test period to be below the formula rate plan bandwidth.  The filing projected a $129.7 million revenue requirement increase to achieve Entergy Arkansas’s target earned return on common equity of 9.75%.  Entergy Arkansas’s formula rate plan is subject to a four percent annual revenue constraint and the projected annual revenue requirement increase exceeded the four percent, resulting in a proposed increase for the 2017 formula rate plan of $70.9 million. In October 2017, Entergy Arkansas filed with the APSC revised formula rate plan attachments that projected a $126.2 million revenue requirement increase based on acceptance of certain adjustments and recommendations made by the APSC staff and other intervenors. The revised formula rate plan filing included a proposed $71.1 million revenue requirement increase based on a revision to the four percent constraint calculation. In October 2017, Entergy Arkansas and the parties to the proceeding filed a joint motion to approve a unanimous settlement agreement resolving all issues in the docket and providing for recovery of the 2017 and 2018 nuclear costs. In December 2017 the APSC approved the settlement agreement and the $71.1 million revenue requirement increase, as well as Entergy Arkansas’s formula rate plan compliance tariff, and the rates became effective with the first billing cycle of January 2018.
 
Internal Restructuring

In November 2017, Entergy Arkansas filed an application with the APSC seeking authorization to undertake a restructuring that would result in the transfer of substantially all of the assets and operations of Entergy Arkansas to a new entity, which would ultimately be owned by an existing Entergy subsidiary holding company. The restructuring is subject to regulatory review and approval by the APSC, the FERC, and the NRC. Entergy Arkansas also filed a notice with the Missouri Public Service Commission in December 2017 out of an abundance of caution, although Entergy Arkansas does not serve any retail customers in Missouri. If the APSC approves the restructuring by September 1, 2018, and the restructuring closes on or before December 1, 2018, Entergy Arkansas proposed in its application to credit retail customers $66 million over six years, beginning in 2019. In February 2018, Entergy Arkansas filed supplemental testimony reducing the proposed retail customer credits to $39.6 million over six years. If the APSC, the FERC, and the NRC approvals are obtained, Entergy Arkansas expects the restructuring will be consummated on or before December 1, 2018.
It is currently contemplated that Entergy Arkansas would undertake a multi-step restructuring, which would include the following:
Entergy Arkansas would redeem its outstanding preferred stock at the aggregate redemption price of approximately $32.7 million, which includes call premiums, plus accumulated and unpaid dividends, if any.
Entergy Arkansas would convert from an Arkansas corporation to a Texas corporation.
Under the Texas Business Organizations Code (TXBOC), Entergy Arkansas will allocate substantially all of its assets to a new subsidiary, Entergy Arkansas Power, LLC, a Texas limited liability company (Entergy Arkansas Power), and Entergy Arkansas Power will assume substantially all of the liabilities of Entergy Arkansas, in a transaction regarded as a merger under the TXBOC. Entergy Arkansas will remain in existence and hold the membership interests in Entergy Arkansas Power.
Entergy Arkansas will contribute the membership interests in Entergy Arkansas Power to an affiliate (Entergy Utility Holding Company, LLC, a Texas limited liability company and subsidiary of Entergy Corporation). As a result of the contribution, Entergy Arkansas Power will be a wholly-owned subsidiary of Entergy Utility Holding Company, LLC.
Entergy Arkansas will change its name to Entergy Utility Property, Inc., and Entergy Arkansas Power will then change its name to Entergy Arkansas, LLC.

Upon the completion of the restructuring, Entergy Arkansas, LLC will hold substantially all of the assets, and will have assumed substantially all of the liabilities, of Entergy Arkansas. Entergy Arkansas may modify or supplement the steps to be taken to effectuate the restructuring.
Filings with the LPSC (Entergy Louisiana)

Retail Rates - Electric

2014 Formula Rate Plan Filing

In connection with the approval of the business combination of Entergy Gulf States Louisiana and Entergy Louisiana, the LPSC authorized the filing of a single, joint, formula rate plan evaluation report for Entergy Gulf States Louisiana’s and Entergy Louisiana’s 2014 calendar year operations. The joint evaluation report was filed in September 2015 and reflected an earned return on common equity of 9.09%. As such, no adjustment to base formula rate plan revenue was required. The following adjustments were required under the formula rate plan, however: a decrease in the additional capacity mechanism for Entergy Louisiana of $17.8 million; an increase in the additional capacity mechanism for Entergy Gulf States Louisiana of $4.3 million; and a reduction of $5.5 million to the MISO cost recovery mechanism to collect approximately $35.7 million on a combined-company basis. Under the order approving the business combination, following completion of the prescribed review period, rates were implemented with the first billing cycle of December 2015, subject to refund. See “Entergy Louisiana and Entergy Gulf States Louisiana Business Combination” below for further discussion of the business combination. In June 2017 the LPSC staff and Entergy Louisiana filed an unopposed joint report of proceedings, which was accepted by the LPSC in June 2017, finalizing the results of this proceeding with no changes to rates already implemented.

2015 Formula Rate Plan Filing

In May 2016, Entergy Louisiana filed its formula rate plan evaluation report for its 2015 calendar year operations. The evaluation report reflected an earned return on common equity of 9.07%. As such, no adjustment to base formula rate plan revenue was required. The following other adjustments, however, were required under the formula rate plan: an increase in the legacy Entergy Louisiana additional capacity mechanism of $14.2 million; a separate increase in legacy Entergy Louisiana revenue of $10 million primarily to reflect the effects of the termination of the System Agreement; an increase in the legacy Entergy Gulf States Louisiana additional capacity mechanism of $0.5 million; a decrease in legacy Entergy Gulf States Louisiana revenue of $58.7 million primarily to reflect the effects of the termination of the System Agreement; and an increase of $11 million to the MISO cost recovery mechanism. Rates were implemented with the first billing cycle of September 2016, subject to refund. Following implementation of the as-filed rates in September 2016, there were several interim updates to Entergy Louisiana’s formula rate plan, including the one submitted in December 2016, reflecting implementation of the settlement of the Waterford 3 replacement steam generator project prudence review described below. In June 2017 the LPSC staff and Entergy Louisiana filed a joint report of proceedings, which was accepted by the LPSC in June 2017, finalizing the results of the May 2016 evaluation report, interim updates, and corresponding proceedings with no changes to rates already implemented.

Extension of MISO Cost Recovery Mechanism Rider

In November 2016, Entergy Louisiana filed with the LPSC a request to extend the MISO cost recovery mechanism rider provision of its formula rate plan. In March 2017 the LPSC staff submitted direct testimony generally supportive of a one-year extension of the MISO cost recovery mechanism and the intervenor in the proceeding did not oppose an extension for this period of time. In July 2017 an uncontested joint stipulation authorizing a one-year extension of the MISO cost recovery mechanism rider was approved.

2016 Formula Rate Plan Filing

In May 2017, Entergy Louisiana filed its formula rate plan evaluation report for its 2016 calendar year operations. The evaluation report reflected an earned return on common equity of 9.84%. As such, no adjustment to base formula rate plan revenue was required. Adjustments, however, were required under the formula rate plan; the 2016 formula rate plan evaluation report showed a decrease in formula rate plan revenue of approximately $16.9 million, comprised of a decrease in legacy Entergy Louisiana formula rate plan revenue of $3.5 million, a decrease in legacy Entergy Gulf States Louisiana formula rate plan revenue of $9.7 million, and a decrease in incremental formula rate plan revenue of $3.7 million. Additionally, the formula rate plan evaluation report called for a decrease of $40.5 million in the MISO cost recovery revenue requirement from the present level of $46.8 million to $6.3 million. Rates reflecting these adjustments were implemented with the first billing cycle of September 2017, subject to refund. In September 2017 the LPSC issued its report indicating that no changes to Entergy Louisiana’s original formula rate plan evaluation report were required but reserved for several issues, including Entergy Louisiana’s September 2017 update to its formula rate plan evaluation report.

Formula Rate Plan Extension Request

In August 2017, Entergy Louisiana filed a request with the LPSC seeking to extend its formula rate plan for three years (2017-2019) with limited modifications to its terms.  Those modifications include: a one-time resetting of base rates to the midpoint of the band at Entergy Louisiana’s authorized return on equity of 9.95% for the 2017 test year; narrowing of the formula rate plan bandwidth from a total of 160 basis points to 80 basis points; and a forward-looking mechanism that would allow Entergy Louisiana to recover certain transmission-related costs contemporaneously with when those projects begin delivering benefits to customers.  Entergy Louisiana requested that the LPSC consider its request on an expedited basis, in an effort to maintain Entergy Louisiana’s current cycle for implementing rate adjustments, i.e., September 2018, without the need for filing a full base rate case proceeding. Several parties have intervened in the proceeding and all parties have been participating in settlement discussions.

Waterford 3 Replacement Steam Generator Project

Following the completion of the Waterford 3 replacement steam generator project, the LPSC undertook a prudence review in connection with a filing made by Entergy Louisiana in April 2013 with regard to the following aspects of the replacement project: 1) project management; 2) cost controls; 3) success in achieving stated objectives; 4) the costs of the replacement project; and 5) the outage length and replacement power costs. In July 2014 the LPSC staff filed testimony recommending potential project and replacement power cost disallowances of up to $71 million, citing a need for further explanation or documentation from Entergy Louisiana.  An intervenor filed testimony recommending disallowance of $141 million of incremental project costs, claiming the steam generator fabricator was imprudent.  Entergy Louisiana provided further documentation and explanation requested by the LPSC staff. An evidentiary hearing was held in December 2014. At the hearing the parties maintained the positions reflected in pre-filed testimony. Entergy Louisiana believed that the replacement steam generator costs were prudently incurred and applicable legal principles supported their recovery in rates.  Nevertheless, Entergy Louisiana recorded a write-off of $16 million of Waterford 3’s plant balance in December 2014 because of the uncertainty at the time associated with the resolution of the prudence review. In December 2015 the ALJ issued a proposed recommendation, which was subsequently finalized, concluding that Entergy Louisiana prudently managed the Waterford 3 replacement steam generator project, including the selection, use, and oversight of contractors, and could not reasonably have anticipated the damage to the steam generators. Nevertheless, the ALJ concluded that Entergy Louisiana was liable for the conduct of its contractor and subcontractor and, therefore, recommended a disallowance of $67 million in capital costs. Additionally, the ALJ concluded that Entergy Louisiana did not sufficiently justify the incurrence of $2 million in replacement power costs during the replacement outage. Although the ALJ’s recommendation had not yet been considered by the LPSC, after considering the progress of the proceeding in light of the ALJ recommendation, Entergy Louisiana recorded in the fourth quarter 2015 approximately $77 million in charges, including a $45 million asset write-off and a $32 million regulatory charge, to reflect that a portion of the assets associated with the Waterford 3 replacement steam generator project was no longer probable of recovery. Entergy Louisiana maintained that the ALJ’s recommendation contained significant factual and legal errors.

In October 2016 the parties reached a settlement in this matter. The settlement was approved by the LPSC in December 2016. The settlement effectively provided for an agreed-upon disallowance of $67 million of plant, which had been previously written off by Entergy Louisiana, as discussed above. The refund to customers of approximately $71 million as a result of the settlement approved by the LPSC was made to customers in January 2017. Of the $71 million of refunds, $68 million was credited to customers through Entergy Louisiana’s formula rate plan, outside of sharing, and $3 million through its fuel adjustment clause. Entergy Louisiana had previously recorded a provision of $48 million for this refund. The previously-recorded provision included the cumulative revenues recorded through December 2016 related to the $67 million of disallowed plant. An additional regulatory charge of $23 million was recorded in fourth quarter 2016 to reflect the effects of the settlement. The settlement also provided that Entergy Louisiana could retain the value associated with potential service credits agreed to by the project contractor, to the extent they are realized in the future. Following a review by the parties, an unopposed joint report of proceedings was filed by the LPSC staff and Entergy Louisiana in May 2017 and the LPSC accepted the joint report of proceedings resolving the matter.

Ninemile 6

In July 2014, Entergy Gulf States Louisiana and Entergy Louisiana filed an unopposed stipulation with the LPSC, which was subsequently approved, that estimated a first year revenue requirement associated with Ninemile 6 and provided a mechanism to update the revenue requirement as the in-service date approached. In late-December 2014, roughly contemporaneous with the unit's placement in service, a final updated estimated revenue requirement of $26.8 million for Entergy Gulf States Louisiana and $51.1 million for Entergy Louisiana was filed. The December 2014 estimate formed the basis of rates implemented effective with the first billing cycle of January 2015. In July 2015, Entergy Louisiana submitted to the LPSC a compliance filing including an estimate at completion, inclusive of interconnection costs and transmission upgrades, of approximately $648 million, or $76 million less than originally estimated, along with other project details and supporting evidence, to enable the LPSC to review the prudence of Entergy Louisiana’s management of the project. Testimony filed by the LPSC staff generally supported the prudence of the management of the project and recovery of the costs incurred to complete the project. The LPSC staff had questioned the warranty coverage for one element of the project. In October 2016 all parties agreed to a stipulation providing that 100% of Ninemile 6 construction costs was prudently incurred and is eligible for recovery from customers, but reserving the LPSC’s rights to review the prudence of Entergy Louisiana’s actions regarding one element of the project. This stipulation was approved by the LPSC in January 2017.

Union Power Station and Deactivation or Retirement Decisions for Entergy Louisiana Plants

In January 2015, Entergy Gulf States Louisiana filed its application with the LPSC for approval of the acquisition and cost recovery of two power blocks of the Union Power Station for an expected base purchase price of approximately $237 million per power block, subject to adjustments. In September 2015, Entergy Gulf States Louisiana agreed to settlement terms with all parties for Entergy Gulf States Louisiana’s purchase of the two power blocks. In October 2015 the LPSC voted unanimously to approve the uncontested settlement which finds, among other things, that acquisition of Power Blocks 3 and 4 is in the public interest and, therefore, prudent. The business combination of Entergy Gulf States Louisiana and Entergy Louisiana received regulatory approval and closed in October 2015 making Entergy Louisiana the named purchaser of Power Blocks 3 and 4 of the Union Power Station. In March 2016, Entergy Louisiana acquired Power Blocks 3 and 4 of Union Power Station for an aggregate purchase price of approximately $474 million and implemented rates to collect the estimated first-year revenue requirement with the first billing cycle of March 2016.

As a term of the LPSC-approved settlement authorizing the purchase of Power Blocks 3 and 4 of the Union Power Station, Entergy Louisiana agreed to make a filing with the LPSC to review its decisions to deactivate Ninemile 3 and Willow Glen 2 and 4 and its decision to retire Little Gypsy 1.  In January 2016, Entergy Louisiana made its compliance filing with the LPSC. Entergy Louisiana, LPSC staff, and intervenors participated in a technical conference in March 2016 where Entergy Louisiana presented information on its deactivation/retirement decisions for these four units in addition to information on the current deactivation decisions for the ten-year planning horizon. Parties have requested further proceedings on the prudence of the decision to deactivate Willow Glen 2 and 4.  No party contests the prudence of the decision to deactivate Willow Glen 2 and 4 or suggests reactivation of these units; however, issues have been raised related to Entergy Louisiana’s decision to give up its transmission service rights in MISO for Willow Glen 2 and 4 rather than placing the units into suspended status for the three-year term permitted by MISO. An evidentiary hearing was held in August 2017 and post-hearing briefs were submitted in October 2017. A decision is expected in 2018.

Retail Rates - Gas 

In accordance with the settlement of Entergy Gulf States Louisiana’s gas rate stabilization plan for the test year ended September 30, 2012, in August 2014, Entergy Gulf States Louisiana submitted for consideration a proposal for implementation of an infrastructure rider to recover expenditures associated with strategic plant investment and relocation projects mandated by local governments. After review by the LPSC staff and inclusion of certain customer safeguards required by the LPSC staff, in December 2014, Entergy Gulf States Louisiana and the LPSC staff submitted a joint settlement for implementation of an accelerated gas pipe replacement program providing for the replacement of approximately 100 miles of pipe over the next ten years, as well as relocation of certain existing pipe resulting from local government-related infrastructure projects, and for a rider to recover the investment associated with these projects. The rider allows for recovery of approximately $65 million over ten years. The rider recovery will be adjusted on a quarterly basis to include actual investment incurred for the prior quarter and is subject to the following conditions, among others: a ten-year term; application of any earnings in excess of 10.45% as an offset to the revenue requirement of the infrastructure rider; adherence to a specified spending plan, within plus or minus 20% annually; annual filings comparing actual versus planned rider spending with actual spending and explanation of variances exceeding 10%; and an annual true-up. The joint settlement was approved by the LPSC in January 2015. Implementation of the infrastructure rider commenced with bills rendered on and after the first billing cycle of April 2015.

2014 Rate Stabilization Plan Filing

In January 2015, Entergy Gulf States Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2014.  The filing showed an earned return on common equity of 7.20%, which resulted in a $706 thousand rate increase.  In April 2015 the LPSC issued findings recommending two adjustments to Entergy Gulf States Louisiana’s as-filed results, and an additional recommendation that did not affect the results. The LPSC staff’s recommended adjustments increase the earned return on equity for the test year to 7.24%. Entergy Gulf States Louisiana accepted the LPSC staff’s recommendations and a revenue increase of $688 thousand was implemented with the first billing cycle of May 2015.

2015 Rate Stabilization Plan Filing

In January 2016, Entergy Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2015. The filing showed an earned return on common equity of 10.22%, which is within the authorized bandwidth, therefore requiring no change in rates. In March 2016 the LPSC staff issued its report stating that the 2015 gas rate stabilization plan filing was in compliance with the exception of several issues that required additional information, explanation, or clarification for which the LPSC staff had reserved the right to further review. In July 2016 the parties to the proceeding filed an unopposed joint report and motion for entry of order accepting the report that indicated no outstanding issues remained in the filing.

In February 2016, Entergy Louisiana filed a motion requesting to extend the term of the gas rate stabilization plan in substantially similar form for an additional three-year term and included a request for sharing of non-jurisdictional compressed natural gas revenues. Following discovery and the filing of testimony by the LPSC staff, Entergy Louisiana and the LPSC submitted a joint motion for hearing an uncontested stipulated settlement resolving the proceeding. A hearing on the stipulation was held in November 2016. The ALJ issued a report of proceedings that was presented with the parties’ stipulation to the LPSC for consideration. The stipulation approving Entergy Louisiana’s requested extension of the rate stabilization plan was approved by the LPSC in December 2016.

2016 Rate Stabilization Plan Filing

In January 2017, Entergy Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2016. The filing of the evaluation report for test year 2016 reflected an earned return on common equity of 6.37%. As part of the original filing, pursuant to the extraordinary cost provision of the rate stabilization plan, Entergy Louisiana sought to recover approximately $1.5 million in deferred operation and maintenance expenses incurred to restore service and repair damage resulting from flooding and widespread rainfall in southeast Louisiana that occurred in August 2016. Entergy Louisiana requested to recover the prudently incurred August 2016 storm restoration costs over ten years, outside of the rate stabilization plan sharing provisions. As a result, Entergy Louisiana’s filing sought an annual increase in revenue of $1.4 million. Following review of the filing, except for the proposed extraordinary cost recovery, the LPSC staff confirmed Entergy Louisiana’s filing was consistent with the principles and requirements of the rate stabilization plan. The extraordinary cost recovery request associated with the 2016 flood-related deferred operation and maintenance expenses incurred for gas operations was removed from the rate stabilization plan pending LPSC consideration in a separate docket. In April 2017 the LPSC approved a joint report of proceedings and Entergy Louisiana submitted a revised evaluation report reflecting a $1.2 million annual increase in revenue with rates implemented with the first billing cycle of May 2017.

In connection with the joint report of proceedings accepted by the LPSC, in May 2017, Entergy Louisiana filed an application to initiate a separate proceeding to recover through the extraordinary cost provision of the gas rate stabilization plan the deferred operation and maintenance expenses of $1.4 million incurred to restore service and repair damage resulting from flooding and widespread rainfall in southeast Louisiana that occurred in August 2016. The LPSC staff submitted its direct testimony in the proceeding recommending recovery of $0.9 million. Entergy Louisiana filed rebuttal testimony responding to the LPSC staff’s recommendation. The procedural schedule was suspended to allow the parties to engage in settlement negotiations, and in February 2018 the LPSC staff and Entergy Louisiana filed an unopposed settlement. If approved by the LPSC, the settlement would provide for Entergy Louisiana to recover, over ten years, the approximately $1.4 million in deferred operation and maintenance expense and related carrying charges. The settlement further provides for recovery to commence in May 2018.

2017 Rate Stabilization Plan Filing

In January 2018, Entergy Louisiana filed with the LPSC its gas rate stabilization plan for test year ended September 30, 2017.  The filing of the evaluation report for the test year 2017 reflected an earned return on common equity of 9.06%.  This earned return is below the earnings sharing band of the rate stabilization plan and results in a rate increase of $0.1 million.  Due to the enactment in late-December 2017 of the Tax Cuts and Jobs Act, Entergy Louisiana did not have adequate time to reflect the effects of this tax legislation in the rate stabilization plan.  As a result, Entergy Louisiana will file a supplement to the January 2018 evaluation report to reflect, among other things, a 21% federal corporate income tax rate.  Any rate change resulting from the revised rate stabilization plan will become effective in rates in May 2018.

Filings with the MPSC (Entergy Mississippi)

Formula Rate Plan Filings

In March 2016, Entergy Mississippi submitted its formula rate plan 2016 test year filing showing Entergy Mississippi’s projected earned return for the 2016 calendar year to be below the formula rate plan bandwidth. The filing showed a $32.6 million rate increase was necessary to reset Entergy Mississippi’s earned return on common equity to the specified point of adjustment of 9.96%, within the formula rate plan bandwidth. In June 2016 the MPSC approved Entergy Mississippi’s joint stipulation with the Mississippi Public Utilities Staff. The joint stipulation provided for a total revenue increase of $23.7 million. The revenue increase includes a $19.4 million increase through the formula rate plan, resulting in a return on common equity point of adjustment of 10.07%. The revenue increase also includes $4.3 million in incremental ad valorem tax expenses to be collected through an updated ad valorem tax adjustment rider. The revenue increase and ad valorem tax adjustment rider were effective with the July 2016 bills.

In March 2017, Entergy Mississippi submitted its formula rate plan 2017 test year filing and 2016 look-back filing showing Entergy Mississippi’s earned return for the historical 2016 calendar year and projected earned return for the 2017 calendar year to be within the formula rate plan bandwidth, resulting in no change in rates. In June 2017, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a stipulation that confirmed that Entergy Mississippi’s earned returns for both the 2016 look-back filing and 2017 test year were within the respective formula rate plan bandwidths. In June 2017 the MPSC approved the stipulation, which resulted in no change in rates.

Filings with the City Council (Entergy New Orleans)

Retail Rates

See “Algiers Asset Transfer” below for discussion of the Algiers asset transfer. As a provision of the settlement agreement approved by the City Council in May 2015 providing for the Algiers asset transfer, it was agreed that, with limited exceptions, no action may be taken with respect to Entergy New Orleans’s base rates until rates are implemented from a base rate case that must be filed for its electric and gas operations in 2018. This provision eliminated the formula rate plan applicable to Algiers operations. The limited exceptions included continued implementation of the then-remaining two years of the four-year phased-in rate increase for the Algiers area and certain exceptional cost increases or decreases in the base revenue requirement. An additional provision of the settlement agreement allowed for continued recovery of the revenue requirement associated with the capacity and energy from Ninemile 6 received by Entergy New Orleans under a power purchase agreement with Entergy Louisiana (Algiers PPA). The settlement authorized Entergy New Orleans to recover the remaining revenue requirement related to the Algiers PPA through base rates charged to Algiers customers. The settlement also provided for continued implementation of the Algiers MISO recovery rider.

In addition to the Algiers PPA, Entergy New Orleans has a separate power purchase agreement with Entergy Louisiana for 20% of the capacity and energy from Ninemile 6 (Ninemile PPA), which commenced operation in December 2014. Initially, recovery of the non-fuel costs associated with the Ninemile PPA was authorized through a special Ninemile 6 rider billed only to Entergy New Orleans customers outside of Algiers.

In August 2015, Entergy New Orleans filed an application with the City Council seeking authorization to proceed with the purchase of Union Power Block 1, with an expected base purchase price of approximately $237 million, subject to adjustments, and seeking approval of the recovery of the associated costs. In November 2015 the City Council issued written resolutions and an order approving an agreement in principle between Entergy New Orleans and City Council advisors providing that the purchase of Union Power Block 1 and related assets by Entergy New Orleans is prudent and in the public interest. The City Council authorized expansion of the terms of the purchased power and capacity acquisition cost recovery rider to recover the non-fuel purchased power expense from Ninemile 6, the revenue requirement associated with the purchase of Power Block 1 of the Union Power Station, and a credit to customers of $400 thousand monthly beginning June 2016 in recognition of the decrease in other operation and maintenance expenses that would result with the deactivation of Michoud Units 2 and 3. In March 2016, Entergy New Orleans purchased Power Block 1 of the Union Power Station for approximately $237 million and initiated recovery of these costs with March 2016 bills. In July 2016, Entergy New Orleans and the City Council Utility Committee agreed to a temporary increase in the Michoud credit to customers to a total of $1.4 million monthly for August 2016 through December 2016.

A 2008 rate case settlement included $3.1 million per year in electric rates to fund the Energy Smart energy efficiency programs.  The rate settlement provided an incentive for Entergy New Orleans to meet or exceed energy savings targets set by the City Council and provided a mechanism for Entergy New Orleans to recover lost contribution to fixed costs associated with the energy savings generated from the energy efficiency programs. In January 2015 the City Council approved funding for the Energy Smart program from April 2015 through March 2017 using the remainder of the approximately $12.8 million of 2014 rough production cost equalization funds, with any remaining costs being recovered through the fuel adjustment clause. This funding methodology was modified in November 2015 when the City Council directed Entergy New Orleans to use a combination of guaranteed customer savings related to a prior agreement with the City Council and rough production cost equalization funds to cover program costs prior to recovering any costs through the fuel adjustment clause. In April 2017 the City Council approved an implementation plan for the Energy Smart program from April 2017 through December 2019. The City Council directed that the $11.8 million balance reported for Energy Smart funds be used to continue funding the program for Entergy New Orleans’s legacy customers and that the Energy Smart Algiers program continue to be funded through the Algiers fuel adjustment clause, until additional customer funding is required for the legacy customers. In September 2017, Entergy New Orleans filed a supplemental plan and proposed several options for an interim cost recovery mechanism necessary to recover program costs during the period between when existing funds directed to Energy Smart programs are depleted (estimated to be June 2018) and when new rates from the anticipated 2018 combined rate case, which will include a cost recovery mechanism for Energy Smart funding, take effect (estimated to be August 2019). Entergy New Orleans requested that the City Council approve a cost recovery mechanism prior to June 2018. In December 2017 the City Council approved an energy efficiency cost recovery rider as an interim funding mechanism for Energy Smart, subject to verification that no additional funding sources exist.

Internal Restructuring

In July 2016, Entergy New Orleans filed an application with the City Council seeking authorization to undertake a restructuring that would result in the transfer of substantially all of the assets and operations of Entergy New Orleans, Inc. to a new entity, which would ultimately be owned by an existing Entergy subsidiary holding company. The restructuring was subject to regulatory review and approval by the City Council and the FERC. In May 2017 the City Council adopted a resolution approving the proposed internal restructuring pursuant to an agreement in principle with the City Council advisors and certain intervenors. Pursuant to the agreement in principle, Entergy New Orleans would credit retail customers $10 million in 2017, $1.4 million in the first quarter of the year after the transaction closes, and $117,500 each month in the second year after the transaction closes until such time as new base rates go into effect as a result of the anticipated 2018 base rate case. Entergy New Orleans began crediting retail customers in June 2017. In June 2017 the FERC approved the transaction and, pursuant to the agreement in principle, Entergy New Orleans will provide additional credits to retail customers of $5 million in each of the years 2018, 2019, and 2020.

In November 2017, pursuant to the agreement in principle, Entergy New Orleans undertook a multi-step restructuring, including the following:

Entergy New Orleans, Inc. redeemed its outstanding preferred stock at a price of approximately $21 million, which included a call premium of approximately $819,000, plus any accumulated and unpaid dividends.
Entergy New Orleans, Inc. converted from a Louisiana corporation to a Texas corporation.
Under the Texas Business Organizations Code (TXBOC), Entergy New Orleans, Inc. allocated substantially all of its assets to a new subsidiary, Entergy New Orleans Power, LLC, a Texas limited liability company (Entergy New Orleans Power), and Entergy New Orleans Power assumed substantially all of the liabilities of Entergy New Orleans, Inc., in a transaction regarded as a merger under the TXBOC. Entergy New Orleans, Inc. remained in existence and held the membership interests in Entergy New Orleans Power.
Entergy New Orleans, Inc. contributed the membership interests in Entergy New Orleans Power to an affiliate (Entergy Utility Holding Company, LLC, a Texas limited liability company and subsidiary of Entergy Corporation). As a result of the contribution, Entergy New Orleans Power is a wholly-owned subsidiary of Entergy Utility Holding Company, LLC.

In December 2017, Entergy New Orleans, Inc. changed its name to Entergy Utility Group, Inc., and Entergy New Orleans Power then changed its name to Entergy New Orleans, LLC. Entergy New Orleans, LLC holds substantially all of the assets, and has assumed substantially all of the liabilities, of Entergy New Orleans, Inc. The restructuring was accounted for as a transaction between entities under common control.

Filings with the PUCT and Texas Cities (Entergy Texas)

Retail Rates

2011 Rate Case

In November 2011, Entergy Texas filed a rate case requesting a $112 million base rate increase reflecting a 10.6% return on common equity based on an adjusted June 2011 test year.  The rate case also proposed a purchased power recovery rider.  On January 12, 2012, the PUCT voted not to address the purchased power recovery rider in the rate case, but the PUCT voted to set a baseline in the rate case proceeding that would be applicable if a purchased power capacity rider is approved in a separate proceeding.  In April 2012 the PUCT Staff filed direct testimony recommending a base rate increase of $66 million and a 9.6% return on common equity.  The PUCT Staff, however, subsequently filed a statement of position in the proceeding indicating that it was still evaluating the position it would ultimately take in the case regarding Entergy Texas’s recovery of purchased power capacity costs and Entergy Texas’s proposal to defer its MISO transition expenses.  In April 2012, Entergy Texas filed rebuttal testimony indicating a revised request for a $105 million base rate increase.  A hearing was held in late-April through early-May 2012.

In September 2012 the PUCT issued an order approving a $28 million rate increase, effective July 2012.  The order included a finding that “a return on common equity (ROE) of 9.80 percent will allow [Entergy Texas] a reasonable opportunity to earn a reasonable return on invested capital.”  The order also provided for increases in depreciation rates and the annual storm reserve accrual.  The order also reduced Entergy Texas’s proposed purchased power capacity costs, stating that they are not known and measurable; reduced Entergy Texas’s regulatory assets associated with Hurricane Rita; excluded from rate recovery capitalized financially-based incentive compensation; included $1.6 million of MISO transition expense in base rates; and reduced Entergy’s Texas’s fuel reconciliation recovery by $4 million because the PUCT disagreed with the line-loss factor used in the calculation.  After considering the progress of the proceeding in light of the PUCT order, Entergy Texas recorded in the third quarter 2012 an approximate $24 million charge to recognize that assets associated with Hurricane Rita, financially-based incentive compensation, and fuel recovery are no longer probable of recovery.  Entergy Texas believed that it was entitled to recover these prudently incurred costs, however, and it filed a motion for rehearing regarding these and several other issues in the PUCT’s order on October 4, 2012.  Several other parties also filed motions for rehearing of the PUCT’s order.  The PUCT subsequently denied rehearing of substantive issues.  Several parties, including Entergy Texas, appealed various aspects of the PUCT’s order to the Travis County District Court. A hearing was held in July 2014. In October 2014 the Travis County District Court issued an order upholding the PUCT’s decision except as to the line-loss factor issue referenced above, which was found in favor of Entergy Texas. In November 2014, Entergy Texas and other parties, including the PUCT, appealed the Travis County District Court decision to the Third Court of Appeals. Oral argument before the court panel was held in September 2015. In April 2016 the Third Court of Appeals issued its opinion affirming the District Court’s decision on all points. Entergy Texas petitioned the Texas Supreme Court to hear its appeal of the Third Court’s ruling. In September 2017 the Texas Supreme Court denied the petitions for review. Entergy Texas filed a motion for rehearing of the Texas Supreme Court’s denial of the petition for review. In January 2018 the Texas Supreme Court denied Entergy Texas’s motion for rehearing.

Distribution cost recovery factor (DCRF) rider

In September 2015, Entergy Texas filed to amend its DCRF rider. Entergy Texas requested an increase in recovery under the rider of $6.5 million, for a total collection of $10.1 million annually from retail customers. In October 2015 intervenors and PUCT staff filed testimony opposing, in part, Entergy Texas’s request. In November 2015, Entergy Texas and the parties filed an unopposed settlement agreement and supporting documents. The settlement established an annual revenue requirement of $8.65 million for the amended DCRF rider, with the resulting rates effective for usage on and after January 1, 2016. The PUCT approved the settlement agreement in February 2016.

In June 2017, Entergy Texas filed an application to amend its DCRF rider by increasing the total collection from $8.65 million to approximately $19 million. In July 2017, Entergy Texas, the PUCT, and the two other parties in the proceeding entered into an unopposed stipulation and settlement agreement resulting in an amended DCRF annual revenue requirement of $18.3 million, with the resulting rates effective for usage no later than October 1, 2017. In September 2017 the PUCT issued its final order approving the unopposed stipulation and settlement agreement. The amended DCRF rider rates became effective for usage on and after September 1, 2017.
    
Transmission cost recovery factor (TCRF) rider

In September 2015, Entergy Texas filed for a TCRF rider requesting a $13 million increase, incremental to base rates. Testimony was filed in November 2015, with the PUCT staff and other parties proposing various disallowances involving, among other things, MISO charges, vegetation management costs, and bad debt expenses that would reduce the requested increase by approximately $2 million. In addition to those recommended disallowances, a number of parties recommended that Entergy Texas’s request be reduced by an additional $3.4 million to account for load growth since base rates were last set. A hearing on the merits was held in December 2015. In February 2016 a State Office of Administrative Hearings ALJ issued a proposal for decision recommending that the PUCT disallow approximately $2 million from Entergy Texas’s $13 million request, but recommending that the PUCT not accept the load growth offset. In June 2016 the PUCT indicated that it would take up in a future rulemaking project the issue of whether a load growth adjustment should apply to a TCRF. In July 2016 the PUCT issued an order generally accepting the proposal for decision but declining to adjust the TCRF baseline in two instances as recommended by the ALJ, which resulted in a total annual allowance of approximately $10.5 million. The PUCT also ordered its staff and Entergy Texas to track all spare autotransformer transfers going forward so that it could address the appropriate accounting treatment and prudence of such transfers in Entergy Texas’s next base rate case. Entergy Texas implemented the TCRF rider beginning with September 2016 bills.

In September 2016, Entergy Texas filed with the PUCT a request to amend its TCRF rider. The proposed amended TCRF rider is designed to collect approximately $29.5 million annually from Entergy Texas’s retail customers. This amount includes the approximately $10.5 million annually that Entergy Texas is currently authorized to collect through the TCRF rider, as discussed above. In December 2016, concurrent with the 2016 fuel reconciliation stipulation and settlement agreement discussed above, Entergy Texas and the PUCT reached a settlement agreeing to the amended TCRF annual revenue requirement of $29.5 million. As discussed above, the terms of the two settlements are interdependent. The PUCT approved the settlement and issued a final order in March 2017. Entergy Texas implemented the amended TCRF rider beginning with bills covering usage on and after March 20, 2017.

Advanced Metering Infrastructure (AMI) Filings

Entergy Arkansas

In September 2016, Entergy Arkansas filed an application seeking a finding from the APSC that Entergy Arkansas’s deployment of AMI is in the public interest. Entergy Arkansas proposed to replace existing meters with advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems. AMI is intended to serve as the foundation of Entergy Arkansas’s modernized power grid. The filing included an estimate of implementation costs for AMI of $208 million. The filing identified a number of quantified and unquantified benefits, and Entergy Arkansas provided a cost benefit analysis showing that its AMI deployment is expected to produce a nominal net benefit to customers of $406 million. Entergy Arkansas also sought to continue to include in rate base the remaining book value of existing meters, which was approximately $57 million at December 31, 2015, that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates. Entergy Arkansas proposed a 15-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019. Deployment of the communications network is expected to begin in 2018. Entergy Arkansas proposed to include the AMI deployment costs and the quantified benefits in future formula rate plan filings, and the 2018 costs were approved in the 2017 formula rate plan filing. In June 2017 the APSC staff and Arkansas Attorney General filed direct testimony. The APSC staff generally supported Entergy Arkansas’s AMI deployment conditioned on various recommendations. The Arkansas Attorney General’s consultant primarily recommended denial of Entergy Arkansas’s application but alternatively suggested recommendations in the event the APSC approves Entergy Arkansas’s proposal. Entergy Arkansas filed rebuttal testimony in June 2017, substantially accepting the APSC staff’s recommendations. In August 2017, Entergy Arkansas and the parties to the proceeding filed a joint motion to approve a unanimous settlement agreement. In October 2017 the APSC issued an order finding that Entergy Arkansas’s AMI deployment is in the public interest and approving the settlement agreement subject to a minor modification. Entergy Arkansas expects to recover the undepreciated balance of its existing meters through a regulatory asset to be amortized over 15 years. Entergy Arkansas has begun discussions with the other parties to implement the items in the settlement agreement including pre-pay and time of use programs.

Entergy Louisiana

In November 2016, Entergy Louisiana filed an application seeking a finding from the LPSC that Entergy Louisiana’s deployment of advanced electric and gas metering infrastructure is in the public interest. Entergy Louisiana proposed to deploy advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems. AMI is intended to serve as the foundation of Entergy Louisiana’s modernized power grid. The filing included an estimate of implementation costs for AMI of $330 million. The filing identified a number of quantified and unquantified benefits, and Entergy Louisiana provided a cost/benefit analysis showing that its combined electric and gas AMI deployment is expected to produce a nominal net benefit to customers of $607 million. Entergy Louisiana also sought to continue to include in rate base the remaining book value, approximately $92 million at December 31, 2015, of the existing electric meters and also to depreciate those assets using current depreciation rates. Entergy Louisiana proposed a 15-year useful life for the new advanced meters, the three-year deployment of which is expected to begin in 2019. The communications network deployment is expected to begin by late-2018, after the necessary information technology infrastructure is in place. Entergy Louisiana proposed to recover the cost of AMI through the implementation of a customer charge, net of certain benefits, phased in over the period 2019 through 2022. The parties reached an uncontested stipulation permitting implementation of Entergy Louisiana’s proposed AMI system, with modifications to the proposed customer charge. In July 2017 the LPSC approved the stipulation. Entergy Louisiana expects to recover the undepreciated balance of its existing meters through a regulatory asset to be amortized at current depreciation rates.

Entergy Mississippi

In November 2016, Entergy Mississippi filed an application seeking an order from the MPSC granting a certificate of public convenience and necessity and finding that Entergy Mississippi’s deployment of AMI is in the public interest. Entergy Mississippi proposed to replace existing meters with advanced meters that enable two-way data communication; to design and build a secure and reliable network to support such communications; and to implement support systems. AMI is intended to serve as the foundation of Entergy Mississippi’s modernized power grid. The filing included an estimate of implementation costs for AMI of $132 million. The filing identified a number of quantified and unquantified benefits, and Entergy Mississippi provided a cost benefit analysis showing that its AMI deployment is expected to produce a nominal benefit to customers of $496 million over a 15-year period, which when netted against the costs of AMI results in $183 million of net customer benefits. Entergy Mississippi also sought to continue to include in rate base the remaining book value, approximately $56 million at December 31, 2015, of existing meters that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates. Entergy Mississippi proposed a 15-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019, subject to approval by the MPSC, with deployment of the communications network expected to begin in 2018. Entergy Mississippi proposed to include the AMI deployment costs and the quantified benefits in existing rate mechanisms, primarily through future formula rate plan filings and/or future energy cost recovery rider schedule re-determinations, as applicable. In May 2017 the Mississippi Public Utilities Staff and Entergy Mississippi entered into and filed a joint stipulation supporting Entergy Mississippi’s filing, and the MPSC issued an order approving the filing without material changes, finding that Entergy Mississippi’s deployment of AMI is in the public interest and granting a certificate of public convenience and necessity. The MPSC order also confirmed that Entergy Mississippi shall continue to include in rate base the remaining book value of existing meters that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates.

Entergy New Orleans

In October 2016, Entergy New Orleans filed an application seeking a finding from the City Council that Entergy New Orleans’s deployment of advanced electric and gas metering infrastructure is in the public interest.  Entergy New Orleans proposed to deploy advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems.  AMI is intended to serve as the foundation of Entergy New Orleans’s modernized power grid.  The filing included an estimate of implementation costs for AMI of $75 million. The filing identified a number of quantified and unquantified benefits, and Entergy New Orleans provided a cost/benefit analysis showing that its combined electric and gas AMI deployment is expected to produce a nominal net benefit to customers of $101 million.  Entergy New Orleans also sought to continue to include in rate base the remaining book value, approximately $21 million at December 31, 2015, of the existing electric meters and also to depreciate those assets using current depreciation rates.  Entergy New Orleans proposed a 15-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019.  Deployment of the information technology infrastructure began in 2017 and deployment of the communications network is expected to begin in 2018.  Entergy New Orleans proposed to recover the cost of AMI through the implementation of a customer charge, net of certain benefits, phased in over the period 2019 through 2022.  The City Council’s advisors filed testimony in May 2017 recommending the adoption of AMI subject to certain modifications, including the denial of Entergy New Orleans’s proposed customer charge as a cost recovery mechanism. In January 2018 a settlement was reached between the City Council’s advisors and Entergy New Orleans. In February 2018 the City Council approved the settlement, which deferred cost recovery to the 2018 Entergy New Orleans rate case, but also stated that an adjustment for 2018-2019 AMI costs can be filed in the rate case and that, for all subsequent AMI costs, the mechanism to be approved in the 2018 rate case will allow for the timely recovery of such costs.

Entergy Texas

In April 2017 the Texas legislature enacted legislation that extends statutory support for AMI deployment to Entergy Texas and directs that if Entergy Texas elects to deploy AMI, it shall do so as rapidly as practicable. In July 2017, Entergy Texas filed an application seeking an order from the PUCT approving Entergy Texas’s deployment of AMI. Entergy Texas proposed to replace existing meters with advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems. AMI is intended to serve as the foundation of Entergy Texas’s modernized power grid. The filing included an estimate of implementation costs for AMI of $132 million. The filing identified a number of quantified and unquantified benefits, with Entergy Texas showing that its AMI deployment is expected to produce nominal net operational cost savings to customers of $33 million. Entergy Texas also sought to continue to include in rate base the remaining book value, approximately $41 million at December 31, 2016, of existing meters that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates. Entergy Texas proposed a seven-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019. Entergy Texas also proposed a surcharge tariff to recover the reasonable and necessary costs it has and will incur under the deployment plan for the full deployment of advanced meters. Further, Entergy Texas sought approval of fees that would be charged to customers who choose to opt out of receiving service through an advanced meter and instead receive electric service with a non-standard meter. In October 2017, Entergy Texas and other parties entered into and filed an unopposed stipulation and settlement agreement, permitting deployment of AMI with limited modifications. The PUCT approved the stipulation and settlement agreement in December 2017. Consistent with the approval, deployment of the communications network is expected to begin in 2018. Entergy Texas expects to recover the remaining net book value of its existing meters through a regulatory asset to be amortized at current depreciation rates.

Entergy Louisiana and Entergy Gulf States Louisiana Business Combination

Entergy Louisiana and Entergy Gulf States Louisiana filed an application with the LPSC in September 2014 seeking authorization to undertake transactions that would result in the combination of Entergy Louisiana and Entergy Gulf States Louisiana into a single public utility. An uncontested stipulated settlement (stipulated settlement) was filed with the LPSC in July 2015. Through the stipulated settlement, the parties agreed to terms upon which to recommend that the LPSC find that the business combination was in the public interest. The stipulated settlement, which was either joined, or unopposed, by all parties to the LPSC proceeding, represented a compromise of stakeholder positions and was the result of an extensive period of analysis, discovery, and negotiation. The stipulated settlement provided $107 million in guaranteed customer benefits during the first nine years following the transaction’s close. Additionally, the combined company would honor the 2013 Entergy Louisiana and Entergy Gulf States Louisiana rate case settlements, including the commitments that (1) there would be no rate increase for legacy Entergy Gulf States Louisiana customers for the 2014 test year, and (2) through the 2016 test year formula rate plan, Entergy Louisiana (as a combined entity) would not raise rates by more than $30 million, net of the $10 million rate increase included in the Entergy Louisiana legacy formula rate plan. The stipulated settlement also provided that Entergy Gulf States Louisiana and Entergy Louisiana would be permitted to defer certain external costs that were incurred to achieve the business combination’s customer benefits. In 2015 deferrals of $16 million for these external costs were recorded, and they are being amortized over a 10-year period. The LPSC approved the business combination in August 2015.

On October 1, 2015, the businesses formerly conducted by Entergy Louisiana and Entergy Gulf States Louisiana were combined into a single public utility. With the completion of the business combination, Entergy Louisiana holds substantially all of the assets, and has assumed the liabilities, of Entergy Louisiana and Entergy Gulf States Louisiana. The combination was accounted for as a transaction between entities under common control. See Note 3 to the financial statements for further discussion of the customer credits resulting from the business combination.

Algiers Asset Transfer (Entergy Louisiana and Entergy New Orleans)

In October 2014, Entergy Louisiana and Entergy New Orleans filed an application with the City Council seeking authorization to undertake a transaction that would result in the transfer from Entergy Louisiana to Entergy New Orleans of certain assets that supported the provision of service to Entergy Louisiana’s customers in Algiers. In April 2015 the FERC issued an order approving the Algiers assets transfer. In May 2015 the parties filed a settlement agreement authorizing the Algiers assets transfer and the settlement agreement was approved by a City Council resolution in May 2015. On September 1, 2015, Entergy Louisiana transferred its Algiers assets to Entergy New Orleans for a purchase price of approximately $85 million. Entergy New Orleans paid Entergy Louisiana $59.6 million, including final true-ups, from available cash and issued a note payable to Entergy Louisiana in the amount of $25.5 million.

System Agreement Cost Equalization Proceedings

Prior to its final termination in 2016, the Utility operating companies historically engaged in the coordinated planning, construction, and operation of generating and bulk transmission facilities under the terms of the System Agreement.  Entergy Arkansas terminated its participation in the System Agreement in December 2013. Entergy Mississippi terminated its participation in the System Agreement in November 2015. The System Agreement terminated with respect to its remaining participants in August 2016.

Although the System Agreement has terminated, certain of the Utility operating companies’ retail regulators continue to pursue litigation involving the System Agreement at the FERC and in federal courts.  The proceedings include challenges to the allocation of costs as defined by the System Agreement and other matters.

In June 2005 the FERC issued a decision in System Agreement litigation that had been commenced by the LPSC, and essentially affirmed its decision in a December 2005 order on rehearing.  The decision included, among other things:

The FERC’s conclusion that the System Agreement no longer roughly equalizes total production costs among the Utility operating companies.
In order to reach rough production cost equalization, the FERC imposed a bandwidth remedy by which each company’s total annual production costs will have to be within +/- 11% of Entergy System average total annual production costs.
In calculating the production costs for this purpose under the FERC’s order, output from the Vidalia hydroelectric power plant will not reflect the actual Vidalia price for the year but is priced at that year’s average price paid by Entergy Louisiana for the exchange of electric energy under Service Schedule MSS-3 of the System Agreement, thereby reducing the amount of Vidalia costs reflected in the comparison of the Utility operating companies’ total production costs.
The remedy ordered by the FERC in 2005 required no refunds and became effective based on calendar year 2006 production costs and the first reallocation payments were made in 2007.
The FERC’s decision reallocated total production costs of the Utility operating companies whose relative total production costs expressed as a percentage of Entergy System average production costs are outside an upper or lower bandwidth.  This was accomplished by payments from Utility operating companies whose production costs were more than 11% below Entergy System average production costs to Utility operating companies whose production costs were more than the Entergy System average production cost, with payments going first to those Utility operating companies whose total production costs were farthest above the Entergy System average.

The LPSC, APSC, MPSC, and the Arkansas Electric Energy Consumers appealed the FERC’s December 2005 decision to the United States Court of Appeals for the D.C. Circuit.  Entergy and the City of New Orleans intervened in the various appeals.  The D.C. Circuit issued its decision in April 2008.  The D.C. Circuit concluded that the FERC’s orders had failed to adequately explain both its conclusion that it was prohibited from ordering refunds for the 20-month period from September 13, 2001 - May 2, 2003 and its determination to implement the bandwidth remedy commencing on January 1, 2006, rather than June 1, 2005.  The D.C. Circuit remanded the case to the FERC for further proceedings on those two issues.

In October 2011 the FERC issued an order addressing the D.C. Circuit remand on the two issues.  On the first issue, the FERC concluded that it did have the authority to order refunds, but decided that it would exercise its equitable discretion and not require refunds for the 20-month period from September 13, 2001 - May 2, 2003.  Because the ruling on refunds relied on findings in the interruptible load proceeding, which is discussed in a separate section below, the FERC concluded that this refund ruling will be held in abeyance pending the outcome of the rehearing requests in the interruptible load proceeding.  On the second issue, the FERC reversed its prior decision and ordered that the prospective bandwidth remedy begin on June 1, 2005 (the date of its initial order in the proceeding) rather than January 1, 2006, as it had previously ordered.  Pursuant to the October 2011 order, Entergy was required to calculate bandwidth payments for the period June - December 2005 utilizing the bandwidth formula tariff prescribed by the FERC that was filed in a December 2006 compliance filing and accepted by the FERC in an April 2007 order.  

In March 2015, in light of a December 2014 decision by the D.C. Circuit in the interruptible load proceeding, Entergy filed with the FERC a motion to establish a briefing schedule on refund issues and an initial brief addressing refund issues. The initial brief argued that the FERC, in response to the D.C. Circuit decision, should clarify its policy on refunds and find that refunds are not required in this proceeding. In October 2015 the FERC issued three orders related to the commencement of the remedy on June 1, 2005 and the inclusion of interest for the period June 1, 2005 through December 31, 2005. Specifically, the FERC rejected Entergy’s request for rehearing of its decision to include interest for the seven-month period. The FERC also rejected Entergy’s request for rehearing of the order rejecting the compliance filing with regard to the issue of interest. Finally, the FERC set for hearing and settlement procedures the 2014 compliance filing that included the bandwidth calculation for the seven months June 1, 2005 through December 31, 2005. In setting the compliance filing for hearing, the FERC rejected the APSC’s protest that Entergy Arkansas should not be subject to the filing because Entergy Arkansas would be making the payments during a period following its exit from the System Agreement. In January 2018 the D.C.Circuit affirmed the FERC decision that Entergy Arkansas was subject to the filing.

In December 2011, Entergy filed with the FERC its compliance filing that provides the payments and receipts among the Utility operating companies pursuant to the FERC’s October 2011 order.  The APSC, the LPSC, the PUCT, and other parties intervened in the December 2011 compliance filing proceeding, and the APSC and the LPSC also filed protests. The filing shows the following payments/receipts among the Utility operating companies:

 
Payments (Receipts)
 
(In Millions)
Entergy Arkansas
$156
Entergy Louisiana
($75)
Entergy Mississippi
($33)
Entergy New Orleans
($5)
Entergy Texas
($43)


Entergy Arkansas made its payment in January 2012.  In February 2012, Entergy Arkansas filed for an interim adjustment to its production cost allocation rider requesting that the $156 million be collected from customers over the 22-month period from March 2012 through December 2013.  In March 2012 the APSC issued an order stating that the payment can be recovered from retail customers through the production cost allocation rider, subject to refund.  The LPSC and the APSC requested rehearing of the FERC’s October 2011 order.  

In February 2014 the FERC issued a rehearing order addressing its October 2011 order. The FERC denied the LPSC’s request for rehearing on the issues of whether the bandwidth remedy should be made effective earlier than June 1, 2005, and whether refunds should be ordered for the 20-month refund effective period. The FERC granted the LPSC’s rehearing request on the issue of interest on the bandwidth payments/receipts for the June - December 2005 period, requiring that interest be accrued from June 1, 2006 until the date those bandwidth payments/receipts are made. Also in February 2014 the FERC issued an order rejecting the December 2011 compliance filing that calculated the bandwidth payments/receipts for the June - December 2005 period. The FERC order required a new compliance filing that calculates the bandwidth payments/receipts for the June - December 2005 period based on monthly data for the seven individual months including interest pursuant to the February 2014 rehearing order. Entergy sought rehearing of the February 2014 order with respect to the FERC’s determinations regarding interest. In April 2014 the LPSC filed a petition for review of the FERC’s October 2011 and February 2014 orders with the U.S. Court of Appeals for the D.C. Circuit. In August 2017 the D.C. Circuit issued a decision addressing the LPSC’s appeal of the FERC’s October 2011 and February 2014 orders. On the issue of the FERC’s implementation of the prospective remedy as of June 2005 and whether the bandwidth remedy should be extended for an additional 17 months in years 2004-2005, the D.C. Circuit affirmed the FERC’s implementation of the remedy and denied the LPSC’s appeal. On the issue of whether the operating companies should be required to issue refunds for the 20-month period from September 2001 to May 2003, the D.C. Circuit granted the FERC’s request for agency reconsideration and remanded that issue back to the FERC for further proceedings as requested by all parties to the appeal.

In April and May 2014, Entergy filed with the FERC an updated compliance filing that provides the payments and receipts among the Utility operating companies pursuant to the FERC’s February 2014 orders.  The filing shows the following net payments and receipts, including interest, among the Utility operating companies:
 
Payments (Receipts)
 
(In Millions)
Entergy Arkansas
$68
Entergy Louisiana
($10)
Entergy Mississippi
($11)
Entergy New Orleans
$2
Entergy Texas
($49)

These payments were made in May 2014. The LPSC, City Council, and APSC filed protests.

The hearing on the bandwidth calculation for the seven months June 1, 2005 through December 31, 2005 occurred in July 2016. The presiding judge issued an initial decision in November 2016. In the initial decision, the presiding judge agreed with the Utility operating companies’ position that: (1) interest on the bandwidth payments for the 2005 test period should be accrued from June 1, 2006 until the date that the bandwidth payments for that calculation are paid, which is consistent with how the Utility operating companies performed the calculation; and (2) a portion of Entergy Louisiana’s 2001-vintage Louisiana state net operating loss accumulated deferred income tax that results from the Vidalia tax deduction should be excluded from the 2005 test period bandwidth calculation. Various participants filed briefs on exceptions and/or briefs opposing exceptions related to the initial decision, including the LPSC, the APSC, the FERC trial staff, and Entergy Services. The initial decision is pending before the FERC.

Rough Production Cost Equalization Rates

Each May from 2007 through 2016 Entergy filed with the FERC the rates to implement the FERC’s orders in the System Agreement proceeding.  These filings showed the following payments/receipts among the Utility operating companies were necessary to achieve rough production cost equalization as defined by the FERC’s orders:
 
Payments (Receipts)
 
2007
 
2008
 
2009
 
2010
 
2011
 
2012
 
2013
 
2014
 
(In Millions)
Entergy Arkansas

$252

 

$252

 

$390

 

$41

 

$77

 

$41

 

$—

 

$—

Entergy Louisiana

($211
)
 

($160
)
 

($247
)
 

($22
)
 

($12
)
 

($41
)
 

$—

 

$—

Entergy Mississippi

($41
)
 

($20
)
 

($24
)
 

($19
)
 

($40
)
 

$—

 

$—

 

$—

Entergy New Orleans

$—

 

($7
)
 

$—

 

$—

 

($25
)
 

$—

 

($15
)
 

($15
)
Entergy Texas

($30
)
 

($65
)
 

($119
)
 

$—

 

$—

 

$—

 

$15

 

$15



The Utility operating companies recorded accounts payable or accounts receivable to reflect the rough production cost equalization payments and receipts required to implement the FERC’s remedy.  When accounts payable were recorded, a corresponding regulatory asset was recorded for the right to collect the payments from customers. When accounts receivable were recorded, a corresponding regulatory liability was recorded for the obligations to pass the receipts on to customers.  No payments were required in 2016 or 2015 to implement the FERC’s remedy based on calendar year 2015 production costs and 2014 production costs, respectively. The System Agreement terminated in August 2016.

The APSC approved a production cost allocation rider for recovery from customers of the retail portion of the costs allocated to Entergy Arkansas.  Entergy Texas recovered its 2013 rough production cost equalization payment over three years beginning April 2014. Entergy Texas included its 2014 rough production cost equalization payment as a component of an interim fuel refund made in 2014. Management believes that any changes in the allocation of production costs resulting from the FERC’s decision and related retail proceedings should result in similar rate changes for retail customers, subject to specific circumstances that have caused trapped costs.

The following rough production cost equalization rate proceedings are still ongoing.

2010 Rate Filing Based on Calendar Year 2009 Production Costs

In May 2010, Entergy filed with the FERC the 2010 rates in accordance with the FERC’s orders in the System Agreement proceeding, and supplemented the filing in September 2010.  Several parties intervened in the proceeding at the FERC, including the LPSC and the City Council, which also filed protests.  In July 2010 the FERC accepted Entergy’s proposed rates for filing, effective June 1, 2010, subject to refund.  After an abeyance of the proceeding schedule, a hearing was held in March 2014 and in December 2015 the FERC issued an order. Among other things, the December 2015 order directed Entergy to submit a compliance filing. In January 2016 the LPSC, the APSC, and Entergy filed requests for rehearing of the FERC’s December 2015 order. In February 2016, Entergy submitted the compliance filing ordered in the December 2015 order.  The result of the true-up payments and receipts for the recalculation of production costs resulted in the following payments/receipts among the Utility operating companies:
 
Payments (Receipts)
 
(In Millions)
Entergy Arkansas
$2
Entergy Louisiana
$6
Entergy Mississippi
($4)
Entergy New Orleans
($1)
Entergy Texas
($3)

 
In September 2016 the FERC accepted the February 2016 compliance filing subject to a further compliance filing made in November 2016. The further compliance filing was required as a result of an order issued in September 2016 ruling on the January 2016 rehearing requests filed by the LPSC, the APSC, and Entergy. In the order addressing the rehearing requests, the FERC granted the LPSC’s rehearing request and directed that interest be calculated on the payment/receipt amounts. The FERC also granted the APSC’s and Entergy’s rehearing request and ordered the removal of both securitized asset accumulated deferred income taxes and contra-securitization accumulated deferred income taxes from the calculation. In November 2016, Entergy submitted its compliance filing in response to the FERC’s order on rehearing. The compliance filing included a revised refund calculation of the true-up payments and receipts based on 2009 test year data and interest calculations. The LPSC protested the interest calculations. In November 2017 the FERC issued an order rejecting the November 2016 compliance filing. The FERC determined that the payments detailed in the November 2016 compliance filing did not include adequate interest for the payments from Entergy Arkansas to Entergy Louisiana because it did not include interest on the principal portion of the payment that was made in February 2016. In December 2017, Entergy recalculated the interest pursuant to the November 2017 order. As a result of the recalculations, Entergy Arkansas owed very minor payments to Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans.

2011 Rate Filing Based on Calendar Year 2010 Production Costs

In May 2011, Entergy filed with the FERC the 2011 rates in accordance with the FERC’s orders in the System Agreement proceeding.  Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest.  In July 2011 the FERC accepted Entergy’s proposed rates for filing, effective June 1, 2011, subject to refund. After an abeyance of the proceeding schedule, in December 2014 the FERC consolidated the 2011 rate filing with the 2012, 2013, and 2014 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

2012 Rate Filing Based on Calendar Year 2011 Production Costs

In May 2012, Entergy filed with the FERC the 2012 rates in accordance with the FERC’s orders in the System Agreement proceeding.  Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest.  In August 2012 the FERC accepted Entergy’s proposed rates for filing, effective June 2012, subject to refund. After an abeyance of the proceeding schedule, in December 2014 the FERC consolidated the 2012 rate filing with the 2011, 2013, and 2014 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

2013 Rate Filing Based on Calendar Year 2012 Production Costs

In May 2013, Entergy filed with the FERC the 2013 rates in accordance with the FERC’s orders in the System Agreement proceeding. Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest. The City Council intervened and filed comments related to including the outcome of a related FERC proceeding in the 2013 cost equalization calculation. In August 2013 the FERC issued an order accepting the 2013 rates, effective June 1, 2013, subject to refund. After an abeyance of the proceeding schedule, in December 2014 the FERC consolidated the 2013 rate filing with the 2011, 2012, and 2014 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

2014 Rate Filing Based on Calendar Year 2013 Production Costs

In May 2014, Entergy filed with the FERC the 2014 rates in accordance with the FERC’s orders in the System Agreement proceeding. Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest. The City Council intervened and filed comments. In December 2014 the FERC issued an order accepting the 2014 rates, effective June 1, 2014, subject to refund, set the proceeding for hearing procedures, and consolidated the 2014 rate filing with the 2011, 2012, and 2013 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

Consolidated 2011, 2012, 2013, and 2014 Rate Filing Proceedings

As discussed above, in December 2014 the FERC consolidated the 2011, 2012, 2013, and 2014 rate filings for settlement and hearing procedures. In May 2015, Entergy filed direct testimony in the consolidated rate filings and the LPSC filed direct testimony concerning its complaint proceeding that is consolidated with the rate filings, challenging certain components of the pending bandwidth calculations for prior years. Hearings occurred in November 2015, and the ALJ issued an initial decision in July 2016. In the initial decision, the ALJ generally agreed with Entergy’s bandwidth calculations with one exception on the accounting related to the Waterford 3 sale/leaseback. Briefs were filed in September 2016 and the proceeding is pending.

Utility Operating Company Termination of System Agreement Participation

Entergy Arkansas and Entergy Mississippi ceased participating in the System Agreement effective December 18, 2013 and November 7, 2015, respectively. Entergy Louisiana, Entergy New Orleans, and Entergy Texas terminated participation in the System Agreement on August 31, 2016, which resulted in the termination of the System Agreement in its entirety pursuant to a settlement agreement approved by the FERC in December 2015.

In December 2013 the FERC set one issue for hearing involving whether and how the benefits associated with settlement with Union Pacific regarding certain coal delivery issues should be allocated among Entergy Arkansas and the other Utility operating companies post-termination of the System Agreement. In December 2014 a FERC ALJ issued an initial decision finding that Entergy Arkansas would realize benefits after December 18, 2013 from the 2008 settlement agreement between Entergy Services, Entergy Arkansas, and Union Pacific, related to certain coal delivery issues. The ALJ further found that all of the Utility operating companies should share in those benefits pursuant to a methodology proposed by the MPSC. The Utility operating companies and other parties to the proceeding filed briefs on exceptions and/or briefs opposing exceptions with the FERC challenging various aspects of the December 2014 initial decision. In March 2016 the FERC issued an opinion affirming the December 2014 initial decision with regard to the determination that there were benefits related to the Union Pacific settlement, which were realized post-Entergy Arkansas’s December 2013 withdrawal from the System Agreement, that should be shared with the other Utility operating companies utilizing the methodology proposed by the MPSC and trued-up to actual coal volumes purchased. In May 2016, Entergy made a compliance filing that provided the calculation of Union Pacific settlement benefits utilizing the methodology adopted by the initial decision, trued-up for the actual volumes of coal purchased. The payments were made in May 2016. In August 2016 the FERC issued an order accepting Entergy’s compliance filing. Also in August 2016 the APSC filed a petition for review of the FERC’s March 2016 and August 2016 orders with the U.S. Court of Appeals for the D.C. Circuit. Oral argument before the D.C. Circuit was held on the APSC’s petition in January 2018 and a decision is pending.

In connection with the System Agreement termination settlement agreement, the purchase power agreements, referred to as the jurisdictional separation plan PPAs, between Entergy Texas and Entergy Gulf States Louisiana that were put in place for certain legacy gas units at the time of Entergy Gulf States’s separation into Entergy Texas and Entergy Gulf States Louisiana terminated effective with the System Agreement termination. Similarly, the purchase power agreement between Entergy Gulf States Louisiana and Entergy Texas for the Calcasieu unit also terminated. In March 2016, Entergy Services filed with the FERC the notices of termination. The jurisdictional separation plan PPAs were the means by which Entergy Texas received payment for its receivable associated with Entergy Louisiana’s Spindletop gas storage facility regulatory asset. As a result of the System Agreement termination settlement agreement, effective with the termination date, Entergy Texas no longer receives payments from Entergy Louisiana related to the Spindletop storage facility, which resulted in a write-off recorded in 2015 by Entergy Texas of $23.5 million ($15.3 million net-of-tax). Upon termination of the System Agreement, other purchase power agreements entered into under Service Schedule MSS-4 of the System Agreement were replaced with updated agreements under a FERC-jurisdictional tariff effective September 1, 2016.

Interruptible Load Proceeding

In April 2007 the U.S. Court of Appeals for the D.C. Circuit issued its opinion in the LPSC’s appeal of the FERC’s March 2004 and April 2005 orders related to the treatment under the System Agreement of the Utility operating companies’ interruptible loads.  In its opinion the D.C. Circuit concluded that the FERC: (1) acted arbitrarily and capriciously by allowing the Utility operating companies to phase-in the effects of the elimination of the interruptible load over a 12-month period of time; (2) failed to adequately explain why refunds could not be ordered under Section 206(c) of the Federal Power Act; and (3) exercised appropriately its discretion to defer addressing the cost of sulfur dioxide allowances until a later time.  The D.C. Circuit remanded the matter to the FERC for a more considered determination on the issue of refunds.  The FERC issued its order on remand in September 2007, in which it directed Entergy to make a compliance filing removing all interruptible load from the computation of peak load responsibility commencing April 1, 2004 and to issue any necessary refunds to reflect this change.  In addition, the order directed the Utility operating companies to make refunds for the period May 1995 through July 1996.  In November 2007 the Utility operating companies filed a refund report describing the refunds to be issued pursuant to the FERC’s orders.  The LPSC filed a protest to the refund report in December 2007, and the Utility operating companies filed an answer to the protest in January 2008.  The refunds were made in October 2008 by the Utility operating companies that owed refunds to the Utility operating companies that were due refunds under the decision.  The APSC and the Utility operating companies appealed the FERC decisions to the D.C. Circuit.

Following the filing of petitioners’ initial briefs, the FERC filed a motion requesting the D.C. Circuit hold the appeal of the FERC’s decisions ordering refunds in the interruptible load proceeding in abeyance and remand the record to the FERC.  The D.C. Circuit granted the FERC’s unopposed motion in June 2009.  In December 2009 the FERC established a paper hearing to determine whether the FERC had the authority and, if so, whether it would be appropriate to order refunds resulting from changes in the treatment of interruptible load in the allocation of capacity costs by the Utility operating companies.  In August 2010 the FERC issued an order stating that it has the authority and refunds are appropriate.  The APSC, the MPSC, and Entergy requested rehearing of the FERC’s decision.  In June 2011 the FERC issued an order granting rehearing in part and denying rehearing in part, in which the FERC determined to invoke its discretion to deny refunds.  The FERC held that in this case where “the Entergy system as a whole collected the proper level of revenue, but, as was later established, incorrectly allocated peak load responsibility among the various Entergy operating companies….the Commission will apply here our usual practice in such cases, invoking our equitable discretion to not order refunds, notwithstanding our authority to do so.”  The LPSC has requested rehearing of the FERC’s June 2011 decision.  In July 2011 the refunds made in the fourth quarter 2009 described above were reversed. In October 2011 the FERC issued an “Order Establishing Paper Hearing” inviting parties that oppose refunds to file briefs within 30 days addressing the LPSC’s argument that FERC precedent supports refunds under the circumstances present in this proceeding.  Parties that favor refunds were then invited to file reply briefs within 21 days of the date that the initial briefs were due.  

In September 2010 the FERC had issued an order setting the refund report filed in the proceeding in November 2007 for hearing and settlement judge procedures.  In May 2011, Entergy filed a settlement agreement that resolved all issues relating to the refund report set for hearing.  In June 2011 the settlement judge certified the settlement as uncontested.  The settlement agreement was approved by the FERC in September 2016.

Prior to the FERC’s June 2011 order on rehearing, Entergy Arkansas filed an application in November 2010 with the APSC for recovery of the refund that it paid.  The APSC denied Entergy Arkansas’s application, and also denied Entergy Arkansas’s petition for rehearing.  If the FERC were to order Entergy Arkansas to pay refunds on rehearing in the interruptible load proceeding the APSC’s decision would trap FERC-approved costs at Entergy Arkansas with no regulatory-approved mechanism to recover them.  In August 2011, Entergy Arkansas filed a complaint in the United States District Court for the Eastern District of Arkansas asking for a declaratory judgment that the rejection of Entergy Arkansas’s application by the APSC is preempted by the Federal Power Act.  The APSC filed a motion to dismiss the complaint.  In April 2012 the United States district court dismissed Entergy Arkansas’s complaint without prejudice stating that Entergy Arkansas’s claim is not ripe for adjudication and that Entergy Arkansas did not have standing to bring suit at this time.

In March 2013 the FERC issued an order denying the LPSC’s request for rehearing of the FERC’s June 2011 order wherein the FERC concluded it would exercise its discretion and not order refunds in the interruptible load proceeding. Based on its review of the LPSC’s request for rehearing and the briefs filed as part of the paper hearing established in October 2011, the FERC affirmed its earlier ruling and declined to order refunds under the circumstances of the case. In May 2013 the LPSC filed a petition for review with the U.S. Court of Appeals for the D.C. Circuit seeking review of FERC prior orders in the interruptible load proceeding that concluded that the FERC would exercise its discretion and not order refunds in the proceeding. Oral argument was held on the appeal in the D.C. Circuit in September 2014. In December 2014 the D.C. Circuit issued an order on the LPSC’s appeal and remanded the case back to the FERC. The D.C. Circuit rejected the LPSC’s argument that there is a presumption in favor of refunds, but it held that the FERC had not adequately explained its decision to deny refunds and directed the FERC “to consider the relevant factors and weigh them against one another.” In March 2015, Entergy filed with the FERC a motion to establish a briefing schedule on remand and an initial brief on remand to address the December 2014 decision by the D.C. Circuit. The initial brief on remand argued that the FERC, in response to the D.C. Circuit decision, should clarify its policy on refunds and find that refunds are not required in the interruptible load proceeding.

In April 2016 the FERC issued an order on remand that addressed the December 2014 decision by the D.C. Circuit in the interruptible load proceeding. The order on remand affirmed the FERC’s denial of refunds for the 15-month refund effective period. The FERC explained and clarified its policies regarding refunds and concluded that the evidence in the record demonstrated that the relevant equitable factors favored not requiring refunds in this case. The FERC also noted that, under Section 206(c) of the Federal Power Act, in a Section 206 proceeding involving two or more electric utility companies of a registered holding company system, the FERC may order refunds only if it determines the refunds would not cause the registered holding company to experience any reduction in revenues resulting from an inability of an electric utility company in the system to recover the resulting increase in costs. The FERC stated it was not able to find that the Entergy system would not experience a reduction in revenues if refunds were awarded in this proceeding, which further supported the denial of refunds. In May 2016 the LPSC filed a request for rehearing of the FERC’s April 2016 order. In September 2016 the FERC issued an order denying the LPSC’s request for rehearing and reaffirming its denial of refunds for the 15-month refund effective period. The LPSC has appealed the April and September 2016 orders to the U.S. Court of Appeals for the D.C. Circuit. Oral argument before the D.C. Circuit was held before the D.C. Circuit in February 2018 and a decision is pending.
 
Entergy Arkansas Opportunity Sales Proceeding

In June 2009 the LPSC filed a complaint requesting that the FERC determine that certain of Entergy Arkansas’s sales of electric energy to third parties: (a) violated the provisions of the System Agreement that allocated the energy generated by Entergy System resources; (b) imprudently denied the Entergy System and its ultimate consumers the benefits of low-cost Entergy System generating capacity; and (c) violated the provision of the System Agreement that prohibited sales to third parties by individual companies absent an offer of a right-of-first-refusal to other Utility operating companies.   The LPSC’s complaint challenged sales made beginning in 2002 and requested refunds.  In July 2009 the Utility operating companies filed a response to the complaint requesting that the FERC dismiss the complaint on the merits without hearing because the LPSC has failed to meet its burden of showing any violation of the System Agreement and failed to produce any evidence of imprudent action by the Entergy System.  In their response, the Utility operating companies explained that the System Agreement clearly contemplates that the Utility operating companies may make sales to third parties for their own account, subject to the requirement that those sales be included in the load (or load shape) for the applicable Utility operating company.  The FERC subsequently ordered a hearing in the proceeding.

The LPSC filed direct testimony in the proceeding alleging, among other things, (1) that Entergy violated the System Agreement by permitting Entergy Arkansas to make non-requirements sales to non-affiliated third parties rather than making such energy available to the other Utility operating companies’ customers; and (2) that over the period 2000 - 2009, these non-requirements sales caused harm to the Utility operating companies’ customers and these customers should be compensated for this harm by Entergy.  In subsequent testimony, the LPSC modified its original damages claim in favor of quantifying damages by re-running intra-system bills.  The Utility operating companies believe the LPSC’s allegations are without merit.  A hearing in the matter was held in August 2010.

In December 2010 the ALJ issued an initial decision.  The ALJ found that the System Agreement allowed for Entergy Arkansas to make the sales to third parties but concluded that the sales should be accounted for in the same manner as joint account sales.  The ALJ concluded that “shareholders” should make refunds of the damages to the Utility operating companies, along with interest.  Entergy disagreed with several aspects of the ALJ’s initial decision and in January 2011 filed with the FERC exceptions to the decision.

The FERC issued a decision in June 2012 and held that, while the System Agreement is ambiguous, it does provide authority for individual Utility operating companies to make opportunity sales for their own account and Entergy Arkansas made and priced these sales in good faith.  The FERC found, however, that the System Agreement does not provide authority for an individual Utility operating company to allocate the energy associated with such opportunity sales as part of its load, but provides a different allocation authority.  The FERC further found that the after-the-fact accounting methodology used to allocate the energy used to supply the sales was inconsistent with the System Agreement.  Quantifying the effect of the FERC’s decision requires re-running intra-system bills for a ten-year period, and the FERC in its decision established further hearing procedures to determine the calculation of the effects.  In July 2012, Entergy and the LPSC filed requests for rehearing of the FERC’s June 2012 decision. A hearing was held in May 2013 to quantify the effect of repricing the opportunity sales in accordance with the FERC’s June 2012 decision.

In August 2013 the presiding judge issued an initial decision in the calculation proceeding. The initial decision concluded that the methodology proposed by the LPSC, rather than the methodologies proposed by Entergy or the FERC Staff, should be used to calculate the payments that Entergy Arkansas is to make to the other Utility operating companies. The initial decision also concluded that the other System Agreement service schedules should not be adjusted and that payments by Entergy Arkansas should not be reflected in the rough production cost equalization bandwidth calculations for the applicable years. The initial decision recognized that the LPSC’s methodology would result in an inequitable windfall to the other Utility operating companies and, therefore, concluded that any payments by Entergy Arkansas should be reduced by 20%. The LPSC, the APSC, the City Council, and FERC staff filed briefs on exceptions and/or briefs opposing exceptions. Entergy filed a brief on exceptions requesting that the FERC reverse the initial decision and a brief opposing certain exceptions taken by the LPSC and FERC staff.

In April 2016 the FERC issued orders addressing requests for rehearing filed in July 2012 and the ALJ’s August 2013 initial decision. The first order denied Entergy’s request for rehearing and affirmed the FERC’s earlier rulings that Entergy’s original methodology for allocating energy costs to the opportunity sales was incorrect and, as a result, Entergy Arkansas must make payments to the other Utility operating companies to put them in the same position that they would have been in absent the incorrect allocation. The FERC clarified that interest should be included with the payments. The second order affirmed in part, and reversed in part, the rulings in the ALJ’s August 2013 initial decision regarding the methodology that should be used to calculate the payments Entergy Arkansas is to make to the other Utility operating companies. The FERC affirmed the ALJ’s ruling that a full re-run of intra-system bills should be performed, but required that methodology be modified so that the sales have the same priority for purposes of energy allocation as joint account sales. The FERC reversed the ALJ’s decision that any payments by Entergy Arkansas should be reduced by 20%. The FERC also reversed the ALJ’s decision that adjustments to other System Agreement service schedules and excess bandwidth payments should not be taken into account when calculating the payments to be made by Entergy Arkansas. The FERC held that such adjustments and excess bandwidth payments should be taken into account, but ordered further proceedings before an ALJ to address whether a cap on any reduction due to bandwidth payments was necessary and to implement the other adjustments to the calculation methodology.

In May 2016, Entergy Services filed a request for rehearing of the FERC’s April 2016 order arguing that payments made by Entergy Arkansas should be reduced as a result of the timing of the LPSC’s approval of certain contracts. Entergy Services also filed a request for clarification and/or rehearing of the FERC’s April 2016 order addressing the ALJ’s August 2013 initial decision. The APSC and the LPSC also filed requests for rehearing of the FERC’s April 2016 order. In September 2017 the FERC issued an order denying the request for rehearing on the issue of whether any payments by Entergy Arkansas to the other Utility operating companies should be reduced due to the timing of the LPSC’s approval of Entergy Arkansas’s wholesale baseload contract with Entergy Louisiana. In November 2017 the FERC issued an order denying all of the remaining requests for rehearing of the April 2016 order. In November 2017, Entergy Services filed a petition for review in the D.C. Circuit of the FERC’s orders in the first two phases of the opportunity sales case. In December 2017 the D.C. Circuit granted Entergy Services’s request to hold the appeal in abeyance pending final resolution of the related proceeding still pending with the FERC. In January 2018 the APSC and the LPSC filed separate petitions for review in the D.C. Circuit, and the D.C. Circuit consolidated the appeals with Entergy Services’s appeal and held all of the appeals in abeyance.

Pursuant to the procedural schedule established in the case, Entergy Services re-ran intra-system bills for the ten-year period 2000-2009 to quantify the effects of the FERC's ruling. In November 2016 the LPSC submitted testimony disputing certain aspects of the calculations. A hearing was held in May 2017. In July 2017, the ALJ issued an initial decision concluding that Entergy Arkansas should pay $86 million plus interest to the other Utility operating companies. In August 2017 the Utility operating companies, the LPSC, the APSC, and FERC staff filed individual briefs on exceptions challenging various aspects of the initial decision. In September 2017 the Utility operating companies, the LPSC, the APSC, the MPSC, the City Council, and FERC staff filed separate briefs opposing exceptions taken by various parties. The case is pending before the FERC. No payments will be made or received by the Utility operating companies until the FERC issues an order reviewing the initial decision and Entergy submits a subsequent filing to comply with that order.

The effect of the FERC’s decisions thus far in the case would be that Entergy Arkansas will make payments to some or all of the other Utility operating companies. Because further proceedings will still occur in the case, the amount and recipients of payments by Entergy Arkansas are unknown at this time. Based on testimony previously submitted in the case and its assessment of the April 2016 FERC orders, in the first quarter 2016, Entergy Arkansas recorded a liability of $87 million, which includes interest, for its estimated increased costs and payment to the other Utility operating companies. This estimate is subject to change depending on how the FERC resolves the issues that are still outstanding in the case, including its review of the July 2017 initial decision. Entergy Arkansas’s increased costs will be attributed to Entergy Arkansas’s retail and wholesale businesses, and it is not probable that Entergy Arkansas will recover the wholesale portion. Entergy Arkansas, therefore, recorded a deferred fuel regulatory asset in the first quarter 2016 of approximately $75 million, which represents its estimate of the retail portion of the costs. Following its assessment of the course of the proceedings, including the FERC’s denial of rehearing in November 2017 described above, in the fourth quarter 2017, Entergy Arkansas recorded an additional liability of $35 million and a regulatory asset of $31 million. Because management currently expects to recover the retail portion of the costs through a base rate proceeding or newly proposed rider, the regulatory asset is reflected as Other regulatory assets as of December 31, 2017.
    
Complaint Against System Energy

In January 2017 the APSC and MPSC filed a complaint with the FERC against System Energy. The complaint seeks a reduction in the return on equity component of the Unit Power Sales Agreement pursuant to which System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. Entergy Arkansas also sells some of its Grand Gulf capacity and energy to Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under separate agreements. The current return on equity under the Unit Power Sales Agreement is 10.94%. The complaint alleges that the return on equity is unjust and unreasonable because current capital market and other considerations indicate that it is excessive. The complaint requests the FERC to institute proceedings to investigate the return on equity and establish a lower return on equity, and also requests that the FERC establish January 23, 2017 as a refund effective date. The complaint includes return on equity analysis that purports to establish that the range of reasonable return on equity for System Energy is between 8.37% and 8.67%. System Energy answered the complaint in February 2017 and disputes that a return on equity of 8.37% to 8.67% is just and reasonable. The LPSC and the City Council intervened in the proceeding expressing support for the complaint. System Energy is recording a provision against revenue for the potential outcome of this proceeding. In September 2017 the FERC established a refund effective date of January 23, 2017, consolidated the return on equity complaint with the proceeding described in Unit Power Sales Agreement below, and directed the parties to engage in settlement proceedings before an ALJ. If the parties fail to come to an agreement during settlement proceedings, a prehearing conference will be held to establish a procedural schedule for hearing proceedings.

Unit Power Sales Agreement

In August 2017, System Energy submitted to the FERC proposed amendments to the Unit Power Sales Agreement pursuant to which System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. The filing proposes limited amendments to the Unit Power Sales Agreement to adopt (1) updated rates for use in calculating Grand Gulf plant depreciation and amortization expenses and (2) updated nuclear decommissioning cost annual revenue requirements, both of which are recovered through the Unit Power Sales Agreement rate formula. The proposed amendments would result in lower charges to the Utility operating companies that buy capacity and energy from System Energy under the Unit Power Sales Agreement. The proposed changes are based on updated depreciation and nuclear decommissioning studies that take into account the renewal of Grand Gulf’s operating license for a term through November 1, 2044. System Energy requested that the FERC accept the amendments effective October 1, 2017.

In September 2017 the FERC accepted System Energy’s proposed Unit Power Sales Agreement amendments, subject to further proceedings to consider the justness and reasonableness of the amendments. Because the amendments propose a rate decrease, the FERC also initiated an investigation under Section 206 of the Federal Power Act to determine if the rate decrease should be lower than proposed. The FERC accepted the proposed amendments effective October 1, 2017, subject to refund pending the outcome of the further settlement and/or hearing proceedings, and established a refund effective date of October 11, 2017 with respect to the rate decrease. The FERC also consolidated the Unit Power Sales Agreement amendment proceeding with the proceeding described in Complaint Against System Energy above, and directed the parties to engage in settlement proceedings before an ALJ. If the parties fail to come to an agreement during settlement proceedings, a prehearing conference will be held to establish a procedural schedule for hearing proceedings.

Storm Cost Recovery Filings with Retail Regulators

Entergy Louisiana

Hurricane Isaac

In August 2012, Hurricane Isaac caused extensive damage to Entergy Louisiana’s service area.  The storm resulted in widespread power outages, significant damage primarily to distribution infrastructure, and the loss of sales during the power outages.  In June 2014 the LPSC authorized Entergy Louisiana to utilize Louisiana Act 55 financing for Hurricane Isaac system restoration costs.  Entergy Louisiana committed to pass on to customers a minimum of $30.8 million of customer benefits through annual customer credits of approximately $6.2 million for five years. Approvals for the Act 55 financings were obtained from the Louisiana Utilities Restoration Corporation (LURC) and the Louisiana State Bond Commission.

In August 2014 the Louisiana Local Government Environmental Facilities and Community Development Authority (LCDA) issued $314.85 million in bonds under Louisiana Act 55.  From the $309 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $16 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $293 million directly to Entergy Louisiana.  Entergy Louisiana used the $293 million received from the LURC to acquire 2,935,152.69 Class C preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 7.5% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2014, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement. The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1.75 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC, and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

Hurricane Gustav and Hurricane Ike

In September 2008, Hurricane Gustav and Hurricane Ike caused catastrophic damage to Entergy Louisiana’s service territory.  In December 2009, Entergy Louisiana entered into a stipulation agreement with the LPSC staff regarding its storm costs.  In March and April 2010, Entergy Louisiana and other parties to the proceeding filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal to utilize Act 55 financing, which included a commitment to pass on to customers a minimum of $43.3 million of customer benefits through a prospective annual rate reduction of $8.7 million for five years.  In April 2010 the LPSC approved the settlement and subsequently issued financing orders and a ratemaking order intended to facilitate the implementation of the Act 55 financings.  In June 2010 the Louisiana State Bond Commission approved the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricane Gustav and Hurricane Ike was reduced by $2.7 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2010, the LCDA issued two series of bonds totaling $713.0 million under Act 55.  From the $702.7 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $290 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $412.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana used $412.7 million to acquire 4,126,940.15 Class B preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 9% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2010, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA, and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC, and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.
Hurricane Katrina and Hurricane Rita

In August and September 2005, Hurricanes Katrina and Rita caused catastrophic damage to Entergy Louisiana’s service territory. In March 2008, Entergy Louisiana and the LURC filed at the LPSC an application requesting that the LPSC grant a financing order authorizing the financing of Entergy Louisiana storm costs, storm reserves, and issuance costs pursuant to Louisiana Act 55.  The Louisiana Act 55 financing is expected to produce additional customer benefits as compared to traditional securitization.  Entergy Louisiana also filed an application requesting LPSC approval for ancillary issues including the mechanism to flow charges and savings to customers via a storm cost offset rider.  In April 2008 the Louisiana Public Facilities Authority (LPFA), which is the issuer of the bonds pursuant to the Act 55 financing, approved requests for the Act 55 financing.  Also in April 2008, Entergy Louisiana and the LPSC staff filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal under the Act 55 financing, which included a commitment to pass on to customers a minimum of $40 million of customer benefits through a prospective annual rate reduction of $8 million for five years.  The LPSC subsequently approved the settlement and issued two financing orders and one ratemaking order intended to facilitate implementation of the Act 55 financing.  In May 2008 the Louisiana State Bond Commission granted final approval of the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricanes Katrina and Rita was reduced by $22.3 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2008 the LPFA issued $687.7 million in bonds under the aforementioned Act 55.  From the $679 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $152 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $527 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $545 million, including $17.8 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 5,449,861.85 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 10% annual distribution rate.  In August 2008, the LPFA issued $278.4 million in bonds under the aforementioned Act 55.  From the $274.7 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $87 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $187.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $189.4 million, including $1.7 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 1,893,918.39 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC that carry a 10% annual distribution rate.  Distributions are payable quarterly commencing on September 15, 2008 and have a liquidation price of $100 per unit.  The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.  In February 2012, Entergy Louisiana sold 500,000 of its Class A preferred membership units in Entergy Holdings Company LLC, a wholly-owned Entergy subsidiary, to a third party in exchange for $51 million plus accrued but unpaid distributions on the units.  The 500,000 preferred membership units are mandatorily redeemable in January 2112.

Entergy and Entergy Louisiana do not report the bonds issued by the LPFA on their balance sheets because the bonds are the obligation of the LPFA, and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC, and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

Entergy Mississippi

Entergy Mississippi has approval from the MPSC to collect a storm damage provision of $1.75 million per month. If Entergy Mississippi’s accumulated storm damage provision balance exceeds $15 million, the collection of the storm damage provision ceases until such time that the accumulated storm damage provision becomes less than $10 million. As of April 30, 2016, Entergy Mississippi’s storm damage provision balance was less than $10 million, therefore Entergy Mississippi resumed billing the monthly storm damage provision effective with June 2016 bills. As of September 30, 2016, however, Entergy Mississippi’s storm damage provision balance again exceeded $15 million. Accordingly the storm damage provision was reset to zero beginning with November 2016 bills. As of July 31, 2017, the balance in Entergy Mississippi’s accumulated storm damage provision was again less than $10 million, therefore Entergy Mississippi resumed billing the monthly storm damage provision effective with September 2017 bills.

Entergy New Orleans

In August 2012, Hurricane Isaac caused extensive damage to Entergy New Orleans’s service area. In January 2015 the City Council issued a resolution approving the terms of a joint agreement in principle filed by Entergy New Orleans, Entergy Louisiana, and the City Council Advisors determining, among other things, that Entergy New Orleans’s prudently-incurred storm recovery costs were $49.3 million, of which $31.7 million, net of reimbursements from the storm reserve escrow account, remained recoverable from Entergy New Orleans’s electric customers. The resolution also directed Entergy New Orleans to file an application to securitize the unrecovered City Council-approved storm recovery costs of $31.7 million pursuant to the Louisiana Electric Utility Storm Recovery Securitization Act (Louisiana Act 64). In addition, the resolution found that it was reasonable for Entergy New Orleans to include in the principal amount of its potential securitization the costs to fund and replenish Entergy New Orleans’s storm reserve in an amount that achieved the City Council-approved funding level of $75 million. In January 2015, in compliance with that directive, Entergy New Orleans filed with the City Council an application requesting that the City Council grant a financing order authorizing the financing of Entergy New Orleans’s storm costs, storm reserves, and issuance costs pursuant to Louisiana Act 64. In May 2015 the parties entered into an agreement in principle and the City Council issued a financing order authorizing Entergy New Orleans to issue storm recovery bonds in the aggregate amount of $98.7 million, including $31.8 million for recovery of Entergy New Orleans’s Hurricane Isaac storm recovery costs, including carrying costs, $63.9 million to fund and replenish Entergy New Orleans’s storm reserve, and approximately $3 million for estimated up-front financing costs associated with the securitization. See Note 5 to the financial statements for discussion of the issuance of the securitization bonds in July 2015.

New Nuclear Generation Development Costs

Entergy Louisiana

Entergy Louisiana and Entergy Gulf States Louisiana were developing a project option for new nuclear generation at River Bend.  In March 2010, Entergy Louisiana and Entergy Gulf States Louisiana filed with the LPSC seeking approval to continue the limited development activities necessary to preserve an option to construct a new unit at River Bend.  At its June 2012 meeting the LPSC voted to uphold an ALJ recommendation that the request of Entergy Louisiana and Entergy Gulf States Louisiana be declined on the basis that the LPSC’s rule on new nuclear development does not apply to activities to preserve an option to develop and on the further grounds that the companies improperly engaged in advanced preparation activities prior to certification.  The LPSC directed that Entergy Louisiana and Entergy Gulf States Louisiana be permitted to seek recovery of these costs in their upcoming rate case filings that were subsequently filed in February 2013. In the resolution of the rate case proceeding the LPSC provided for an eight-year amortization of costs incurred in connection with the potential development of new nuclear generation at River Bend, without carrying costs, beginning in December 2014, provided, however, that amortization of these costs shall not result in a future rate increase. As of December 31, 2017, Entergy Louisiana has a regulatory asset of $35.8 million on its balance sheet related to these new nuclear generation development costs.
Entergy Arkansas [Member]  
Rate And Regulatory Matters
RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)
 
Regulatory Assets and Regulatory Liabilities

Regulatory assets represent probable future revenues associated with costs that Entergy expects to recover from customers through the regulatory ratemaking process under which the Utility business operates. Regulatory liabilities represent probable future reductions in revenues associated with amounts that Entergy expects to benefit customers through the regulatory ratemaking process under which the Utility business operates. In addition to the regulatory assets and liabilities that are specifically disclosed on the face of the balance sheets, the tables below provide detail of “Other regulatory assets” and “Other regulatory liabilities” that are included on Entergy’s and the Registrant Subsidiaries’ balance sheets as of December 31, 2017 and 2016:
 
Other Regulatory Assets

Entergy
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$2,642.3

 

$2,635.5

Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
746.0

 
677.2

Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 2 – Storm Cost Recovery Filings with Retail Regulators) (Note 5)
558.9

 
637.0

Removal costs - recovered through depreciation rates (Note 9) (a)
436.5

 
353.9

Opportunity Sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding)
109.8

 

Retail rate deferrals - recovered through rate riders as rates are redetermined by retail regulators
86.4

 
22.1

Unamortized loss on reacquired debt - recovered over term of debt
82.9

 
91.4

Little Gypsy costs – recovered through securitization (Note 5 – Entergy Louisiana Securitization Bonds - Little Gypsy)
73.7

 
100.0

Transition to competition costs - recovered over a 15-year period through February 2021
37.7

 
47.9

New nuclear generation development costs (Note 2 - New Nuclear Generation Development Costs) (b)
36.4

 
43.7

Other
125.1

 
161.2

Entergy Total

$4,935.7

 

$4,769.9



Entergy Arkansas
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$757.0

 

$786.6

Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
345.2

 
322.9

Removal costs - recovered through depreciation rates (Note 9) (a)
176.9

 
128.5

Opportunity sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding)
109.8

 

Storm damage costs - recovered either through securitization or retail rates (Note 5 - Entergy Arkansas Securitization Bonds)
76.2

 
88.9

Retail rate deferrals - recovered through rate riders as rates are redetermined annually
28.2

 
10.1

Unamortized loss on reacquired debt - recovered over term of debt
24.3

 
27.6

ANO Fukushima and Flood Barrier costs - recovered through retail rates through February 2026 (Note 2 - Retail Rate Proceedings) (b)
14.4

 
16.1

Lake Catherine 4 reliability and sustainability cost deferral - recovery through retail rates (b)
8.9

 
9.8

Incremental ice storm costs - recovered through 2032
7.4

 
7.9

MISO costs - recovery through retail rates through 2018 (Note 2 - Retail Rate Proceedings) (b)
5.5

 
11.1

Human capital management costs - recovery through retail rates through August 2019 (Note 2 - Retail Rate Proceedings) (b)
4.4

 
7.0

Other
9.2

 
11.5

Entergy Arkansas Total

$1,567.4

 

$1,428.0



Entergy Louisiana
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans and Non-Qualified Pension Plans) (a)

$724.6

 

$715.7

Asset Retirement Obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
218.6

 
199.4

Little Gypsy costs – recovered through securitization (Note 5 – Entergy Louisiana Securitization Bonds - Little Gypsy)
71.4

 
97.8

New nuclear generation development costs - recovery through formula rate plan beginning December 2014 through November 2022 (Note 2 - New Nuclear Generation Development Costs) (b)
35.8

 
43.1

Unamortized loss on reacquired debt - recovered over term of debt
24.7

 
27.0

Storm damage costs - recovered through retail rates (Note 2 - Storm Cost Recovery Filings with Retail Regulators)
14.3

 

Business combination external costs deferral - recovery through formula rate plan beginning December 2015 through November 2025 (b)
14.1

 
15.2

River Bend AFUDC - recovered through August 2025 (Note 1 – River Bend AFUDC)
12.9

 
14.8

Other
29.4

 
55.1

Entergy Louisiana Total

$1,145.8

 

$1,168.1



Entergy Mississippi
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$218.7

 

$217.2

Removal costs - recovered through depreciation rates (Note 9) (a)
91.6

 
82.0

Retail rate deferrals - recovered through rate riders as rates are redetermined annually
49.4

 
9.3

Unamortized loss on reacquired debt - recovered over term of debt
17.6

 
18.9

Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
7.6

 
7.2

Other
13.0

 
7.6

Entergy Mississippi Total

$397.9

 

$342.2



Entergy New Orleans
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$102.8

 

$108.8

Storm damage costs, including hurricane costs - recovered through retail rates and securitization (Note 2 - Storm Cost Recovery Filings with Retail Regulators)
82.3

 
93.6

Removal costs - recovered through depreciation rates (Note 9) (a)
44.8

 
40.1

Retail rate deferrals - recovered through rate riders as rates are redetermined monthly or annually
4.4

 
4.3

Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
4.3

 
4.2

Unamortized loss on reacquired debt - recovered over term of debt
3.0

 
3.4

Rate case costs - recovered over a 6-year period through September 2021 (Note 2 - Retail Rate Proceedings)
2.6

 
3.0

Michoud plant maintenance – recovered over a 7-year period through September 2018
1.4

 
3.3

Other
5.8

 
7.4

Entergy New Orleans Total

$251.4

 

$268.1



Entergy Texas
 
2017
 
2016
 
(In Millions)
Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 5 - Entergy Texas Securitization Bonds)

$386.1

 

$442.4

Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
169.2

 
201.7

Transition to competition costs - recovered over a 15-year period through February 2021
37.7

 
47.9

Removal costs - recovered through depreciation rates (Note 9) (a)
55.2

 
33.5

Unamortized loss on reacquired debt - recovered over term of debt
8.7

 
9.0

Other
4.5

 
5.7

Entergy Texas Total

$661.4

 

$740.2



System Energy
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans and Other Postretirement Benefits) (a)

$202.7

 

$193.5

Asset retirement obligation - recovery dependent upon timing of decommissioning (Note 9) (a)
169.1

 
142.5

Removal costs - recovered through depreciation rates (Note 9) (a)
67.9

 
69.7

Unamortized loss on reacquired debt - recovered over term of debt
4.6

 
5.5

System Energy Total

$444.3

 

$411.2



(a)
Does not earn a return on investment, but is offset by related liabilities.
(b)
Does not earn a return on investment.
Other Regulatory Liabilities

Entergy
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)

$989.3

 

$735.5

Vidalia purchased power agreement (Note 8) (b)
151.6

 
202.4

Louisiana Act 55 financing savings obligation (Note 2 - Storm Cost Recovery Filings with Retail Regulators) (b)
124.8

 
165.5

Grand Gulf sale-leaseback - (Note 10 - Sale and Leaseback Transactions)
67.9

 
67.9

Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates beginning December 2015 through November 2024 (Note 2 - Entergy Louisiana and Entergy Gulf States Louisiana Business Combination)
65.8

 
83.5

Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4

 
44.4

Asset retirement obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
36.7

 
32.7

Removal costs - returned to customers through depreciation rates (Note 9) (a)
32.4

 
53.9

Entergy Mississippis accumulated accelerated Grand Gulf amortization - amortized and credited through the Unit Power Sales Agreement
32.1

 
39.3

Waterford 3 replacement steam generator provision (Note 2 - Retail Rate Proceedings)

 
68.0

Other
43.5

 
79.8

Entergy Total

$1,588.5

 

$1,572.9


Entergy Arkansas
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)

$354.0

 

$280.8

Other
9.6

 
25.1

Entergy Arkansas Total

$363.6

 

$305.9



Entergy Louisiana
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)

$323.7

 

$235.4

Vidalia purchased power agreement (Note 8) (b)
151.6

 
202.4

Louisiana Act 55 financing savings obligation (Note 2 - Storm Cost Recovery Filings with Retail Regulators) (b)
124.8

 
165.5

Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates beginning December 2015 through November 2024 (Note 2 - Entergy Louisiana and Entergy Gulf States Louisiana Business Combination)
65.8

 
83.5

Gas hedging costs - refunded through fuel rates (Note 15 - Derivatives)

 
10.9

Asset Retirement Obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
36.7

 
32.7

Removal costs - returned to customers through depreciation rates (Note 9) (a)
32.4

 
53.9

Waterford 3 replacement steam generator provision (Note 2 - Retail Rate Proceedings)

 
68.0

Other
26.1

 
28.7

Entergy Louisiana Total

$761.1

 

$881.0



Entergy Texas
 
2017
 
2016
 
(In Millions)
Transition to competition costs - returned to customers through rate riders when rates are redetermined periodically

$4.8

 

$6.2

Other
2.1

 
2.3

Entergy Texas Total

$6.9

 

$8.5


System Energy
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 17) (a)

$311.6

 

$219.3

Grand Gulf sale-leaseback - (Note 10 - Sale and Leaseback Transactions)
67.9

 
67.9

Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4

 
44.4

Entergy Mississippis accumulated accelerated Grand Gulf amortization - amortized and credited through the Unit Power Sales Agreement
32.1

 
39.3

System Energy Total

$456.0

 

$370.9



(a)
Offset by related asset.
(b)
As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21% effective January 2018, the Vidalia purchased power agreement regulatory liability was reduced by $30.5 million and the Louisiana Act 55 financing savings obligation regulatory liabilities were reduced by $25.0 million, with corresponding increases to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

Regulatory activity regarding the Tax Cuts and Jobs Act

See the “Other Tax Matters - Tax Cuts and Jobs Act” section in Note 3 to the financial statements for discussion of the effects of the enactment of the Tax Cuts and Jobs Act, in December 2017, including its effects on Entergy’s and the Registrant Subsidiaries’ regulatory asset/liability for income taxes.

After enactment of the Tax Cuts and Jobs Act the APSC issued an order that applies to investor-owned utilities in Arkansas, including Entergy Arkansas. The order requests information regarding certain effects of the Tax Cuts and Jobs Act and requires the utilities to begin, effective January 1, 2018, to record regulatory liabilities to record the effects of the Act, subject to review by the APSC, although the order acknowledges that the exact amount of tax savings and rate reductions cannot be determined at this time. Entergy Arkansas requested clarification or, in the alternative, rehearing regarding the requirement to record a regulatory liability, and also responded to the request for information. In its request for clarification Entergy Arkansas sought clarification that the amount of any regulatory liability would be determined only after the utilities are heard and present evidence on the issue, as this otherwise would be arbitrary and could implicate single-issue and retroactive ratemaking. The APSC has not responded to the request for clarification. In its response to the APSC’s request for information Entergy Arkansas states that its formula rate plan rider already provides the means for customers to realize the benefits of the Act, except for the return of unprotected excess accumulated deferred income taxes. Entergy Arkansas’s next formula rate plan filing is scheduled for July 2018. Entergy Arkansas intends to return unprotected excess accumulated deferred income taxes as expeditiously as possible, subject to a subsequent request to be made by Entergy Arkansas and approval by the APSC.

After enactment of the Tax Cuts and Jobs Act the LPSC passed an agenda item requiring utilities, including Entergy Louisiana, to file reports regarding certain effects of the Act. Entergy Louisiana responded to the directive and stated in its response that it is working with the LPSC staff and other interested parties to extend its formula rate plan such that its next base rate change will occur effective September 2018, or it would file a base rate case. Entergy Louisiana went on to state that if the formula rate plan is extended Entergy Louisiana’s next adjustment of rates will reflect the new 21% federal corporate income tax rate. Entergy Louisiana stated that it is working with the LPSC staff and interested parties to determine when the tax rate reduction will be reflected in rates, along with when and how the excess accumulated deferred income taxes will be reflected in rates, and how certain tax sharing agreement customer credits will be adjusted. On February 21, 2018, the LPSC issued a special order requiring that all LPSC-jurisdictional utilities, beginning as of January 1, 2018, record as a regulatory liability (deferred liability) the amount required to reflect the reduction in the federal corporate income tax rate from 35% to 21% and the associated savings in excess accumulated deferred income taxes until such time as its rates are changed by the LPSC to reflect these federal tax savings. In the same special order, the LPSC also initiated a new rulemaking docket to consider these issues and the appropriate manner in which to flow through the benefits to Louisiana customers and to provide an opportunity for discovery and comments of jurisdictional utilities and other interested stakeholders. The rulemaking further requires the LPSC staff to report back to the LPSC as soon as practicable and preferably by the March 21, 2018, LPSC Business and Executive Session with recommendations as to how the federal tax-related benefits will be flowed through to Louisiana customers.

After enactment of the Tax Cuts and Jobs Act the MPSC ordered utilities, including Entergy Mississippi, that operate under a formula rate plan to file a description by February 26, 2018, of how the Act will be reflected in the formula rate plan under which the utility operates. In addition to the description that is due February 26, 2018, Entergy Mississippi’s formula rate plan 2018 test year filing is scheduled to be filed by March 15, 2018.

After enactment of the Tax Cuts and Jobs Act the City Council passed a resolution ordering Entergy New Orleans to, effective January 1, 2018, record deferred regulatory liabilities to account for the Act’s effect on Entergy New Orleans’s revenue requirement and to make a filing by mid-March 2018 regarding the Act’s effects on Entergy New Orleans’s operating income and rate base and potential mechanisms for customers to receive benefits of the Act. The resolution also directed Entergy New Orleans to request that Entergy Services file with the FERC for revisions of the Unit Power Sales Agreement and MSS-4 replacement tariffs to address the return of excess accumulated deferred income taxes. Entergy plans to make such filings with the FERC by the end of March 2018.
After enactment of the Tax Cuts and Jobs Act the PUCT issued an order requiring most utilities, including Entergy Texas, beginning January 25, 2018, to record a regulatory liability for the difference between revenues collected under existing rates and revenues that would have been collected had existing rates been set using the new federal income tax rates and also for the balance of excess accumulated deferred income taxes. The order also directs the PUCT staff to investigate each investor-owned utility on a case-by-case basis to determine the appropriate mechanism to adjust its rates to reflect the changes under the Act. In both a memorandum issued prior to the open meeting when the order was discussed and during the discussions at the open meeting discussing the order, the PUCT indicated that it would consider utility earnings in determining the treatment of the liability and the effects of the Act. Entergy Texas had previously provided information to the PUCT Staff in the docket and stated that it expects the PUCT to address the lower tax expense as part of Entergy Texas’s rate case expected to be filed in May 2018. Entergy Texas also stated that it would be inappropriate for the PUCT to require a refund of the reduction in income tax expense in 2018 resulting from the Act on a retroactive basis and without a comprehensive review of Entergy Texas’s cost of service and earned return on equity. In a subsequent order issued following the February 2018 open meeting, the PUCT clarified that carrying costs need not be recorded as part of the regulatory liability.

The Registrant Subsidiaries will continue to work with their respective regulators to determine the appropriate path forward in each jurisdiction regarding the effects of the Act.

Fuel and purchased power cost recovery

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas are allowed to recover fuel and purchased power costs through fuel mechanisms included in electric and gas rates that are recorded as fuel cost recovery revenues.  The difference between revenues collected and the current fuel and purchased power costs is generally recorded as “Deferred fuel costs” on the Utility operating companies’ financial statements.  The table below shows the amount of deferred fuel costs as of December 31, 2017 and 2016 that Entergy expects to recover (or return to customers) through fuel mechanisms, subject to subsequent regulatory review.
 
2017
 
2016
 
(In Millions)
Entergy Arkansas (a)

$130.4

 

$163.6

Entergy Louisiana (b)

$96.7

 

$119.9

Entergy Mississippi

$32.4

 

$7.0

Entergy New Orleans (b)

($3.7
)
 

$8.9

Entergy Texas

($67.3
)
 

($54.5
)

(a)
Includes $67.1 million in 2017 and $66.9 million in 2016 of fuel and purchased power costs, which do not currently earn a return on investment and whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.
(b)
Includes $168.1 million in each year for Entergy Louisiana and $4.1 million in each year for Entergy New Orleans of fuel, purchased power, and capacity costs, which do not currently earn a return on investment and whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.

Entergy Arkansas

Production Cost Allocation Rider

The APSC approved a production cost allocation rider for recovery from customers of the retail portion of the costs allocated to Entergy Arkansas as a result of the System Agreement proceedings, which are discussed in the “System Agreement Cost Equalization Proceedings” section below.  These costs cause an increase in Entergy Arkansas’s deferred fuel cost balance because Entergy Arkansas pays the costs over seven months but collects the costs from customers over twelve months.

In May 2014, Entergy Arkansas filed its annual redetermination of the production cost allocation rider to recover the $3 million unrecovered retail balance as of December 31, 2013 and the $67.8 million System Agreement bandwidth remedy payment made in May 2014 as a result of the compliance filing pursuant to the FERC’s February 2014 orders related to the bandwidth payments/receipts for the June - December 2005 period. In January 2015 the APSC issued an order approving Entergy Arkansas’s request for recovery of the $3 million under-recovered amount based on the true-up of the production cost allocation rider and the $67.8 million May 2014 System Agreement bandwidth remedy payment subject to refund with interest, with recovery of these payments concluding with the last billing cycle in December 2015. The APSC also found that Entergy Arkansas is entitled to carrying charges pursuant to the current terms of the production cost allocation rider. Entergy Arkansas made its compliance filing pursuant to the order in January 2015 and the APSC issued its approval order, also in January 2015. The redetermined rate went into effect with the first billing cycle of February 2015.

In May 2015, Entergy Arkansas filed its annual redetermination of the production cost allocation rider, which included a $38 million payment made by Entergy Arkansas as a result of the FERC’s February 2014 order related to the comprehensive bandwidth recalculation for calendar year 2006, 2007, and 2008 production costs. The redetermined rate for the 2015 production cost allocation rider update was added to the redetermined rate from the 2014 production cost allocation rider update and the combined rate was effective with the first billing cycle of July 2015. This combined rate was effective through December 2015. The collection of the remainder of the redetermined rate for the 2015 production cost allocation rider update continued through June 2016.

In May 2016, Entergy Arkansas filed its annual redetermination pursuant to the production cost allocation rider, which reflected recovery of the production cost allocation rider true-up adjustment of the 2014 and 2015 unrecovered retail balance in the amount of $1.9 million. Additionally, the redetermined rates reflected the recovery of a $1.9 million System Agreement bandwidth remedy payment resulting from a compliance filing pursuant to the FERC’s December 2015 order related to test year 2009 production costs. The rates for the 2016 production cost allocation rider update became effective with the first billing cycle of July 2016, and the rates were effective through June 2017.

In May 2017, Entergy Arkansas filed its annual redetermination pursuant to the production cost allocation rider, which reflected a credit amount of $0.3 million resulting from a compliance filing pursuant to the FERC’s September 2016 order. Additionally, the redetermined rate reflected recovery of the production cost allocation rider true-up adjustment of the 2016 unrecovered retail balance in the amount of $0.3 million. Because of the small effect of the 2017 production cost allocation rider update, Entergy Arkansas proposed to reduce the effective period of the update to one month, July 2017. After the one month collection period, rates were set to zero for all rate classes for the period August 2017 through June 2018.

Energy Cost Recovery Rider

Entergy Arkansas’s retail rates include an energy cost recovery rider to recover fuel and purchased energy costs in monthly customer bills.  The rider utilizes the prior calendar-year energy costs and projected energy sales for the twelve-month period commencing on April 1 of each year to develop an energy cost rate, which is redetermined annually and includes a true-up adjustment reflecting the over- or under-recovery, including carrying charges, of the energy costs for the prior calendar year.  The energy cost recovery rider tariff also allows an interim rate request depending upon the level of over- or under-recovery of fuel and purchased energy costs.

In January 2014, Entergy Arkansas filed a motion with the APSC relating to its redetermination of its energy cost rate that was subsequently filed in March 2014. In that motion, Entergy Arkansas requested that the APSC authorize Entergy Arkansas to exclude $65.9 million of deferred fuel and purchased energy costs incurred in 2013 from the redetermination of its 2014 energy cost rate. The $65.9 million is an estimate of the incremental fuel and replacement energy costs that Entergy Arkansas incurred as a result of the ANO stator incident. Entergy Arkansas requested that the APSC authorize Entergy Arkansas to retain that amount in its deferred fuel balance, with recovery to be reviewed in a later period after more information is available regarding various claims associated with the ANO stator incident. The APSC approved Entergy Arkansas’s request in February 2014. In July 2017, Entergy Arkansas filed for a change in rates pursuant to its formula rate plan rider. In that docket, the APSC approved a settlement agreement agreed upon by the parties, including a provision that requires Entergy Arkansas to initiate a docket for the purpose of recovering funds currently withheld from rates and related to the stator incident, including the $65.9 million of deferred fuel and purchased energy costs previously noted, subject to certain timelines and conditions set forth in the settlement agreement. See the “ANO Damage, Outage, and NRC Reviews” section in Note 8 to the financial statements for further discussion of the ANO stator incident.

In March 2017, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01164 per kWh to $0.01547 per kWh. The APSC staff filed testimony in March 2017 recommending that the redetermined rate be implemented with the first billing cycle of April 2017 under the normal operation of the tariff. Accordingly, the redetermined rate went into effect on March 31, 2017 pursuant to the tariff. In July 2017 the Arkansas Attorney General requested additional information to support certain of the costs included in Entergy Arkansas’s 2017 energy cost rate redetermination.

Entergy Louisiana

Entergy Louisiana recovers electric fuel and purchased power costs for the billing month based upon the level of such costs incurred two months prior to the billing month. Entergy Louisiana’s purchased gas adjustments include estimates for the billing month adjusted by a surcharge or credit that arises from an annual reconciliation of fuel costs incurred with fuel cost revenues billed to customers, including carrying charges.

In April 2010 the LPSC authorized its staff to initiate an audit of Entergy Louisiana’s fuel adjustment clause filings.  The audit included a review of the reasonableness of charges flowed through the fuel adjustment clause by Entergy Louisiana for the period from 2005 through 2009.  The LPSC staff issued its audit report in January 2013.  The LPSC staff recommended that Entergy Louisiana refund approximately $1.9 million, plus interest, to customers and realign the recovery of approximately $1 million from Entergy Louisiana’s fuel adjustment clause to base rates.  The recommended refund was made by Entergy Louisiana in May 2013 in the form of a credit to customers through its fuel adjustment clause filing. In October 2016 the LPSC staff filed testimony affirming the recommendation in its audit report on the lone remaining issue that nuclear dry fuel storage costs should be realigned to base rates. The parties agreed to remove that remaining issue to a separate docket because the same issue was outstanding in the Entergy Gulf States Louisiana audit for the same time period. In November 2016 the LPSC approved the resolution of this audit and the creation of a new docket for the resolution of the proper method of recovery for nuclear dry fuel storage costs. In December 2016 the LPSC opened a new docket in order to resolve the issue regarding the proper methodology for the recovery of nuclear dry fuel storage costs. In October 2017 the LPSC approved the continued recovery of the nuclear dry fuel storage costs through the fuel adjustment clause, resolving the open issue in the audit.

In December 2011 the LPSC authorized its staff to initiate a proceeding to audit the fuel adjustment clause filings of Entergy Gulf States Louisiana and its affiliates.  The audit included a review of the reasonableness of charges flowed by Entergy Gulf States Louisiana through its fuel adjustment clause for the period 2005 through 2009.  In March 2016 the LPSC staff consultant issued its audit report. In its report, the LPSC staff consultant recommended that Entergy Louisiana refund approximately $8.6 million, plus interest, to customers and realign the recovery of approximately $12.7 million from Entergy Gulf States Louisiana’s fuel adjustment clause to base rates. In September 2016 the LPSC staff filed testimony stating that it was no longer recommending a disallowance of $3.4 million of the $8.6 million discussed above, but otherwise maintained positions from its report. Subsequently, the parties entered into a settlement, which was approved by the LPSC in November 2016. The settlement recognized the dry cask storage recovery method issue, which was addressed in the separate proceeding approved by the LPSC in October 2017, provided for a refund of $5 million, which was made to legacy Entergy Gulf States Louisiana customers in December 2016, and resolved all other issues raised in the audit.
In July 2014 the LPSC authorized its staff to initiate an audit of Entergy Gulf States Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed by Entergy Gulf States Louisiana through its fuel adjustment clause for the period from 2010 through 2013. Discovery commenced in July 2015. No report of audit has been issued.

In July 2014 the LPSC authorized its staff to initiate an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed by Entergy Louisiana through its fuel adjustment clause for the period from 2010 through 2013. Discovery commenced in July 2015. No report of audit has been issued.

In June 2016 the LPSC staff provided notice of audits of Entergy Louisiana’s fuel adjustment clause filings and purchased gas adjustment clause filings. In recognition of the business combination that occurred in 2015, the audit notice was issued to Entergy Louisiana and will also include a review of charges to legacy Entergy Gulf States Louisiana customers prior to the business combination. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s fuel adjustment clause for the period from 2014 through 2015 and charges flowed through Entergy Louisiana’s purchased gas adjustment clause for the period from 2012 through 2015. Discovery commenced in March 2017. No report of audit has been issued.

Due to higher fuel costs for the operating month of January 2018 resulting in part from recent cold weather, higher Henry Hub prices, and an increase in total fuel and purchased power costs, Entergy Louisiana plans to cap the average fuel adjustment charge to be billed in March 2018 at $0.03060 per kWh and to defer billing of all fuel costs in excess of the capped amounts by including such costs in the over- or under-recovery account.

Entergy Mississippi

Entergy Mississippi’s rate schedules include an energy cost recovery rider that is adjusted annually to reflect accumulated over- or under-recoveries.  Entergy Mississippi’s fuel cost recoveries are subject to annual audits conducted pursuant to the authority of the MPSC.

Entergy Mississippi had a deferred fuel over-recovery balance of $58.3 million as of May 31, 2015, along with an under-recovery balance of $12.3 million under the power management rider. Pursuant to those tariffs, in July 2015, Entergy Mississippi filed for interim adjustments under both the energy cost recovery rider and the power management rider to flow through to customers the approximately $46 million net over-recovery over a six-month period. In August 2015, the MPSC approved the interim adjustments effective with September 2015 bills. In November 2015, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included a projected over-recovery balance of $48 million projected through January 31, 2016. In January 2016 the MPSC approved the redetermined annual factor effective February 1, 2016. The MPSC further ordered, however, that due to the significant change in natural gas price forecasts since Entergy Mississippi’s filing in November 2015 Entergy Mississippi should file a revised fuel factor with the MPSC no later than February 1, 2016. Pursuant to that order, Entergy Mississippi submitted a revised fuel factor. Additionally, because Entergy Mississippi’s projected over-recovery balance for the period ending January 31, 2016 was $68 million, in February 2016, Entergy Mississippi filed for another interim adjustment to the energy cost factor effective April 2016 to flow through to customers the projected over-recovery balance over a six-month period. That interim adjustment was approved by the MPSC in February 2016 effective for April 2016 bills.

In November 2016, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an over-recovery of less than $2 million as of September 30, 2016. In January 2017 the MPSC approved the annual factor effective with February 2017 bills. Also in January 2017 the MPSC certified to the Mississippi Legislature the audit reports of its independent auditors for the fuel year ending September 30, 2016. In its order, the MPSC expressly reserved the right to review and determine the recoverability of any and all purchased power expenditures made during fiscal year 2016. The MPSC hired independent auditors to conduct an annual operations audit and a financial audit. The independent auditors issued their audit reports in December 2017. The audit reports included several recommendations for action by Entergy Mississippi but did not recommend any cost disallowances. In January 2018 the MPSC certified the audit reports to the Mississippi Legislature. In November 2017 the Public Utilities Staff separately engaged a consultant to review the outage at the Grand Gulf Nuclear Station that began in 2016. The review is currently in progress.

In November 2017, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an under-recovery of approximately $61.5 million as of September 30, 2017. Entergy Mississippi proposed a two-tiered energy cost factor designed to promote overall rate stability throughout 2018 particularly during the summer months. In January 2018 the MPSC approved the proposed energy cost factors effective for February 2018 bills.

Mississippi Attorney General Complaint

The Mississippi attorney general filed a complaint in state court in December 2008 against Entergy Corporation, Entergy Mississippi, Entergy Services, and Entergy Power alleging, among other things, violations of Mississippi statutes, fraud, and breach of good faith and fair dealing, and requesting an accounting and restitution.  The complaint is wide ranging and relates to tariffs and procedures under which Entergy Mississippi purchases power not generated in Mississippi to meet electricity demand.  Entergy believes the complaint is unfounded.  In December 2008 the defendant Entergy companies removed the Attorney General’s lawsuit to U.S. District Court in Jackson, Mississippi.  The Mississippi attorney general moved to remand the matter to state court.  In August 2012 the District Court issued an opinion denying the Attorney General’s motion for remand, finding that the District Court has subject matter jurisdiction under the Class Action Fairness Act.

The defendant Entergy companies answered the complaint and filed a counterclaim for relief based upon the Mississippi Public Utilities Act and the Federal Power Act.  In May 2009 the defendant Entergy companies filed a motion for judgment on the pleadings asserting grounds of federal preemption, the exclusive jurisdiction of the MPSC, and factual errors in the Attorney General’s complaint.  In September 2012 the District Court heard oral argument on Entergy’s motion for judgment on the pleadings.

In January 2014 the U.S. Supreme Court issued a decision in which it held that cases brought by attorneys general as the sole plaintiff to enforce state laws were not considered “mass actions” under the Class Action Fairness Act, so as to establish federal subject matter jurisdiction. One day later the Attorney General renewed his motion to remand the Entergy case back to state court, citing the U.S. Supreme Court’s decision. The defendant Entergy companies responded to that motion reiterating the additional grounds asserted for federal question jurisdiction, and the District Court held oral argument on the renewed motion to remand in February 2014. In April 2015 the District Court entered an order denying the renewed motion to remand, holding that the District Court has federal question subject matter jurisdiction. The Attorney General appealed to the U.S. Fifth Circuit Court of Appeals the denial of the motion to remand. In July 2015 the Fifth Circuit issued an order denying the appeal, and the Attorney General subsequently filed a petition for rehearing of the request for interlocutory appeal, which was also denied. In December 2015 the District Court ordered that the parties submit to the court undisputed and disputed facts that are material to the Entergy defendants’ motion for judgment on the pleadings, as well as supplemental briefs regarding the same. Those filings were made in January 2016.

In September 2016 the Attorney General filed a mandamus petition with the U.S. Fifth Circuit Court of Appeals in which the Attorney General asked the Fifth Circuit to order the chief judge to reassign this case to another judge. In September 2016 the District Court denied the Entergy companies’ motion for judgment on the pleadings. The Entergy companies filed a motion seeking to amend the District Court’s order denying the Entergy companies’ motion for judgment on the pleadings and allowing an interlocutory appeal. In October 2016 the Fifth Circuit granted the Attorney General’s motion for writ of mandamus and directed the chief judge to assign the case to a new judge. The case was reassigned in October 2016. In January 2017 the District Court denied the Entergy companies’ motion to amend the order denying the motion for judgment on the pleadings. In June 2017 the District Court issued a case management order setting a trial date in November 2018. Discovery is currently in progress.
Entergy New Orleans

Entergy New Orleans’s electric rate schedules include a fuel adjustment tariff designed to reflect no more than targeted fuel and purchased power costs, adjusted by a surcharge or credit for deferred fuel expense arising from the monthly reconciliation of actual fuel and purchased power costs incurred with fuel cost revenues billed to customers, including carrying charges.
 
Entergy New Orleans’s gas rate schedules include a purchased gas adjustment to reflect estimated gas costs for the billing month, adjusted by a surcharge or credit similar to that included in the electric fuel adjustment clause, including carrying charges.

Due to higher fuel costs associated in part with the extended Grand Gulf outage and the partially simultaneous Union Power Block 1 planned outage, for the December 2016, January 2017, and February 2017 billing months, the City Council authorized Entergy New Orleans to cap the fuel adjustment charge billed to customers at $0.035 per kWh and to defer billing of all fuel costs in excess of the capped amount by including such costs in the over- or under-recovery account.

Due to higher fuel costs for the operating month of January 2018 resulting in part from recent cold weather, higher Henry Hub prices, and an increase in total fuel and purchased power costs associated in part with certain plant outages, Entergy New Orleans has proposed to cap the fuel adjustment charge to be billed in March 2018 to non-transmission Entergy New Orleans legacy customers and Entergy New Orleans Algiers customers at $0.035323 per kWh and $0.025446 per kWh, respectively. Entergy New Orleans has also proposed to cap the fuel adjustment charge to be billed in March 2018 for Entergy New Orleans legacy transmission customers at $0.034609 per kWh and to defer billing of all fuel costs in excess of the capped amount by including such costs in the over- or under-recovery account.

Entergy Texas

Entergy Texas’s rate schedules include a fixed fuel factor to recover fuel and purchased power costs, including interest, not recovered in base rates.   Semi-annual revisions of the fixed fuel factor are made in March and September based on the market price of natural gas and changes in fuel mix.  The amounts collected under Entergy Texas’s fixed fuel factor and any interim surcharge or refund are subject to fuel reconciliation proceedings before the PUCT.
        
In August 2014, Entergy Texas filed an application seeking PUCT approval to implement an interim fuel refund of approximately $24.6 million for over-collected fuel costs incurred during the months of November 2012 through April 2014. This refund resulted from (i) applying $48.6 million in bandwidth remedy payments that Entergy Texas received in May 2014 related to the June - December 2005 period to Entergy Texas’s $8.7 million under-recovered fuel balance as of April 30, 2014 and (ii) netting that fuel balance against the $15.3 million bandwidth remedy payment that Entergy Texas made related to calendar year 2013 production costs. Also in August 2014, Entergy Texas filed an unopposed motion for interim rates to implement these refunds for most customers over a two-month period commencing with September 2014. The PUCT issued its order approving the interim relief in August 2014 and Entergy Texas completed the refunds in October 2014. Parties intervened in this matter, and all parties agreed that the proceeding should be bifurcated such that the proposed interim refund would become final in a separate proceeding, which refund was approved by the PUCT in March 2015.   In July 2015 certain parties filed briefs in the open proceeding asserting that Entergy Texas should refund to retail customers an additional $10.9 million in bandwidth remedy payments Entergy Texas received related to calendar year 2006 production costs.  In October 2015 an ALJ issued a proposal for decision recommending that the additional $10.9 million in bandwidth remedy payments be refunded to retail customers. In January 2016 the PUCT issued its order affirming the ALJ’s recommendation, and Entergy Texas filed a motion for rehearing of the PUCT’s decision, which the PUCT denied. In March 2016, Entergy Texas filed a complaint in Federal District Court for the Western District of Texas and a petition in the Travis County (State) District Court appealing the PUCT’s decision. The pending appeals did not stay the PUCT’s decision. In April 2016, Entergy Texas filed with the PUCT an application to refund to customers approximately $56.2 million. The refund resulted from (i) $41.8 million of fuel cost recovery over-collections through February 2016, (ii) the $10.9 million in bandwidth remedy payments, discussed above, that Entergy Texas received related to calendar year 2006 production costs, and (iii) $3.5 million in bandwidth remedy payments that Entergy Texas received related to 2006-2008 production costs. In June 2016, Entergy Texas filed an unopposed settlement agreement that added additional over-recovered fuel costs for the months of March and April 2016. The settlement resulted in a $68 million refund. The ALJ approved the refund on an interim basis to be made to most customers over a four-month period beginning with the first billing cycle of July 2016. In July 2016 the PUCT issued an order approving the interim refund. The federal appeal of the PUCT’s January 2016 decision was heard in December 2016, and the Federal District Court granted Entergy Texas’s requested relief. In January 2017 the PUCT and an intervenor filed petitions for appeal to the U.S. Court of Appeals for the Fifth Circuit of the Federal District Court ruling. Oral argument was held before the U.S. Court of Appeals for the Fifth Circuit in February 2018, and a decision is pending. The State District Court appeal of the PUCT’s January 2016 decision also remains pending.

In July 2016, Entergy Texas filed an application to reconcile its fuel and purchased power costs for the period April 1, 2013 through March 31, 2016. Under a recent PUCT rule change, a fuel reconciliation is required to be filed at least once every three years and outside of a base rate case filing. During the reconciliation period, Entergy Texas incurred approximately $1.77 billion in Texas jurisdictional eligible fuel and purchased power expenses, net of certain revenues credited to such expenses and other adjustments. Entergy Texas estimated an over-recovery balance of approximately $19.3 million, including interest, which Entergy Texas requested authority to carry over as the beginning balance for the subsequent reconciliation period beginning Apri1 2016. Entergy Texas also noted, however, that the estimated $19.3 million over collection was being refunded to customers as a portion of the interim fuel refund beginning with the first billing cycle of July 2016, discussed above. Entergy Texas also requested a prudence finding for each of the fuel-related contracts and arrangements entered into or modified during the reconciliation period that have not been reviewed by the PUCT in a prior proceeding. In December 2016, Entergy Texas entered into a stipulation and settlement agreement resulting in a $6 million disallowance not associated with any particular issue raised and a refund of the over-recovery balance of $21 million as of November 30, 2016, to most customers beginning April 2017 through June 2017. This settlement was developed concurrently with the stipulation and settlement agreement in the 2016 transmission cost recovery factor rider amendment discussed below, and the terms and conditions in both settlements are interdependent. The fuel reconciliation settlement was approved by the PUCT in March 2017 and the refunds were made.

In June 2017, Entergy Texas filed an application for a fuel refund of approximately $30.7 million for the months of December 2016 through April 2017. For most customers, the refunds flowed through bills for the months of July 2017 through September 2017. The fuel refund was approved by the PUCT in August 2017.

In December 2017, Entergy Texas filed an application for a fuel refund of approximately $30.5 million for the months of May 2017 through October 2017. Also in December 2017, the PUCT’s ALJ approved the refund on an interim basis. For most customers, the refunds flowed through bills beginning January 2018 and will continue through March 2018. A final decision in this matter remains pending.
    
Retail Rate Proceedings

Filings with the APSC (Entergy Arkansas)

Retail Rates

2015 Base Rate Filing
 
In April 2015, Entergy Arkansas filed with the APSC for a general change in rates, charges, and tariffs. The filing notified the APSC of Entergy Arkansas’s intent to implement a forward test year formula rate plan pursuant to Arkansas legislation passed in 2015, and requested a retail rate increase of $268.4 million, with a net increase in revenue of $167 million. The filing requested a 10.2% return on common equity. In September 2015 the APSC staff and intervenors filed direct testimony, with the APSC staff recommending a revenue requirement of $217.9 million and a 9.65% return on common equity. In December 2015, Entergy Arkansas, the APSC staff, and certain of the intervenors in the rate case filed with the APSC a joint motion for approval of a settlement of the case that proposed a retail rate increase of approximately $225 million with a net increase in revenue of approximately $133 million; an authorized return on common equity of 9.75%; and a formula rate plan tariff that provides a +/- 50 basis point band around the 9.75% allowed return on common equity. A significant portion of the rate increase is related to Entergy Arkansas’s acquisition in March 2016 of Union Power Station Power Block 2 for a base purchase price of $237 million. The settlement agreement also provided for amortization over a 10-year period of $7.7 million of previously-incurred costs related to ANO post-Fukushima compliance and $9.9 million of previously-incurred costs related to ANO flood barrier compliance. A settlement hearing was held in January 2016. In February 2016 the APSC approved the settlement with one exception that reduced the retail rate increase proposed in the settlement by $5 million. The settling parties agreed to the APSC modifications in February 2016. The new rates were effective February 24, 2016 and began billing with the first billing cycle of April 2016. In March 2016, Entergy Arkansas made a compliance filing regarding the new rates that included an interim base rate adjustment surcharge, effective with the first billing cycle of April 2016, to recover the incremental revenue requirement for the period February 24, 2016 through March 31, 2016. The interim base rate adjustment surcharge was designed to recover a total of $21.1 million over the nine-month period from April 2016 through December 2016.

2016 Formula Rate Plan Filing
    
In July 2016, Entergy Arkansas filed with the APSC its 2016 formula rate plan filing showing Entergy Arkansas’s projected earned return on common equity for the twelve months ended December 31, 2017 test period to be below the formula rate plan bandwidth. The filing requested a $67.7 million revenue requirement increase to achieve Entergy Arkansas’s target earned return on common equity of 9.75%. In October 2016, Entergy Arkansas filed with the APSC revised formula rate plan attachments with an updated request for a $54.4 million revenue requirement increase based on acceptance of certain adjustments and recommendations made by the APSC staff and other intervenors, as well as three additional adjustments identified as appropriate by Entergy Arkansas. In November 2016 a hearing was held and the APSC issued an order directing the parties to brief certain issues. In December 2016 the APSC approved the settlement agreement and the $54.4 million revenue requirement increase with approximately $25 million of the $54.4 million revenue requirement subject to possible future adjustment and refund to customers with interest. The APSC requested supplemental information for some of Entergy Arkansas’s requested nuclear expenditures. In December 2016 the APSC approved Entergy Arkansas’s formula rate plan compliance tariff, and the rates became effective with the first billing cycle of January 2017. In April 2017, Entergy Arkansas filed a motion consented to by all parties requesting that it be permitted to submit the supplemental information requested by the APSC in conjunction with its 2017 formula rate plan filing, which was subsequently made in July 2017 and is discussed below. In May 2017 the APSC approved the joint motion and proposal to review Entergy Arkansas’s supplemental information on a concurrent schedule with the 2017 formula rate plan filing. In October 2017, Entergy Arkansas and the parties to the proceeding filed a joint motion to approve a unanimous settlement agreement resolving all issues in the docket and providing for recovery of the 2017 and 2018 nuclear costs. In December 2017 the APSC approved the settlement agreement and recovery of the 2017 and 2018 nuclear costs.

2017 Formula Rate Plan Filing

In July 2017, Entergy Arkansas filed with the APSC its 2017 formula rate plan filing showing Entergy Arkansas’s projected earned return on common equity for the twelve months ended December 31, 2018 test period to be below the formula rate plan bandwidth.  The filing projected a $129.7 million revenue requirement increase to achieve Entergy Arkansas’s target earned return on common equity of 9.75%.  Entergy Arkansas’s formula rate plan is subject to a four percent annual revenue constraint and the projected annual revenue requirement increase exceeded the four percent, resulting in a proposed increase for the 2017 formula rate plan of $70.9 million. In October 2017, Entergy Arkansas filed with the APSC revised formula rate plan attachments that projected a $126.2 million revenue requirement increase based on acceptance of certain adjustments and recommendations made by the APSC staff and other intervenors. The revised formula rate plan filing included a proposed $71.1 million revenue requirement increase based on a revision to the four percent constraint calculation. In October 2017, Entergy Arkansas and the parties to the proceeding filed a joint motion to approve a unanimous settlement agreement resolving all issues in the docket and providing for recovery of the 2017 and 2018 nuclear costs. In December 2017 the APSC approved the settlement agreement and the $71.1 million revenue requirement increase, as well as Entergy Arkansas’s formula rate plan compliance tariff, and the rates became effective with the first billing cycle of January 2018.
 
Internal Restructuring

In November 2017, Entergy Arkansas filed an application with the APSC seeking authorization to undertake a restructuring that would result in the transfer of substantially all of the assets and operations of Entergy Arkansas to a new entity, which would ultimately be owned by an existing Entergy subsidiary holding company. The restructuring is subject to regulatory review and approval by the APSC, the FERC, and the NRC. Entergy Arkansas also filed a notice with the Missouri Public Service Commission in December 2017 out of an abundance of caution, although Entergy Arkansas does not serve any retail customers in Missouri. If the APSC approves the restructuring by September 1, 2018, and the restructuring closes on or before December 1, 2018, Entergy Arkansas proposed in its application to credit retail customers $66 million over six years, beginning in 2019. In February 2018, Entergy Arkansas filed supplemental testimony reducing the proposed retail customer credits to $39.6 million over six years. If the APSC, the FERC, and the NRC approvals are obtained, Entergy Arkansas expects the restructuring will be consummated on or before December 1, 2018.
It is currently contemplated that Entergy Arkansas would undertake a multi-step restructuring, which would include the following:
Entergy Arkansas would redeem its outstanding preferred stock at the aggregate redemption price of approximately $32.7 million, which includes call premiums, plus accumulated and unpaid dividends, if any.
Entergy Arkansas would convert from an Arkansas corporation to a Texas corporation.
Under the Texas Business Organizations Code (TXBOC), Entergy Arkansas will allocate substantially all of its assets to a new subsidiary, Entergy Arkansas Power, LLC, a Texas limited liability company (Entergy Arkansas Power), and Entergy Arkansas Power will assume substantially all of the liabilities of Entergy Arkansas, in a transaction regarded as a merger under the TXBOC. Entergy Arkansas will remain in existence and hold the membership interests in Entergy Arkansas Power.
Entergy Arkansas will contribute the membership interests in Entergy Arkansas Power to an affiliate (Entergy Utility Holding Company, LLC, a Texas limited liability company and subsidiary of Entergy Corporation). As a result of the contribution, Entergy Arkansas Power will be a wholly-owned subsidiary of Entergy Utility Holding Company, LLC.
Entergy Arkansas will change its name to Entergy Utility Property, Inc., and Entergy Arkansas Power will then change its name to Entergy Arkansas, LLC.

Upon the completion of the restructuring, Entergy Arkansas, LLC will hold substantially all of the assets, and will have assumed substantially all of the liabilities, of Entergy Arkansas. Entergy Arkansas may modify or supplement the steps to be taken to effectuate the restructuring.
Filings with the LPSC (Entergy Louisiana)

Retail Rates - Electric

2014 Formula Rate Plan Filing

In connection with the approval of the business combination of Entergy Gulf States Louisiana and Entergy Louisiana, the LPSC authorized the filing of a single, joint, formula rate plan evaluation report for Entergy Gulf States Louisiana’s and Entergy Louisiana’s 2014 calendar year operations. The joint evaluation report was filed in September 2015 and reflected an earned return on common equity of 9.09%. As such, no adjustment to base formula rate plan revenue was required. The following adjustments were required under the formula rate plan, however: a decrease in the additional capacity mechanism for Entergy Louisiana of $17.8 million; an increase in the additional capacity mechanism for Entergy Gulf States Louisiana of $4.3 million; and a reduction of $5.5 million to the MISO cost recovery mechanism to collect approximately $35.7 million on a combined-company basis. Under the order approving the business combination, following completion of the prescribed review period, rates were implemented with the first billing cycle of December 2015, subject to refund. See “Entergy Louisiana and Entergy Gulf States Louisiana Business Combination” below for further discussion of the business combination. In June 2017 the LPSC staff and Entergy Louisiana filed an unopposed joint report of proceedings, which was accepted by the LPSC in June 2017, finalizing the results of this proceeding with no changes to rates already implemented.

2015 Formula Rate Plan Filing

In May 2016, Entergy Louisiana filed its formula rate plan evaluation report for its 2015 calendar year operations. The evaluation report reflected an earned return on common equity of 9.07%. As such, no adjustment to base formula rate plan revenue was required. The following other adjustments, however, were required under the formula rate plan: an increase in the legacy Entergy Louisiana additional capacity mechanism of $14.2 million; a separate increase in legacy Entergy Louisiana revenue of $10 million primarily to reflect the effects of the termination of the System Agreement; an increase in the legacy Entergy Gulf States Louisiana additional capacity mechanism of $0.5 million; a decrease in legacy Entergy Gulf States Louisiana revenue of $58.7 million primarily to reflect the effects of the termination of the System Agreement; and an increase of $11 million to the MISO cost recovery mechanism. Rates were implemented with the first billing cycle of September 2016, subject to refund. Following implementation of the as-filed rates in September 2016, there were several interim updates to Entergy Louisiana’s formula rate plan, including the one submitted in December 2016, reflecting implementation of the settlement of the Waterford 3 replacement steam generator project prudence review described below. In June 2017 the LPSC staff and Entergy Louisiana filed a joint report of proceedings, which was accepted by the LPSC in June 2017, finalizing the results of the May 2016 evaluation report, interim updates, and corresponding proceedings with no changes to rates already implemented.

Extension of MISO Cost Recovery Mechanism Rider

In November 2016, Entergy Louisiana filed with the LPSC a request to extend the MISO cost recovery mechanism rider provision of its formula rate plan. In March 2017 the LPSC staff submitted direct testimony generally supportive of a one-year extension of the MISO cost recovery mechanism and the intervenor in the proceeding did not oppose an extension for this period of time. In July 2017 an uncontested joint stipulation authorizing a one-year extension of the MISO cost recovery mechanism rider was approved.

2016 Formula Rate Plan Filing

In May 2017, Entergy Louisiana filed its formula rate plan evaluation report for its 2016 calendar year operations. The evaluation report reflected an earned return on common equity of 9.84%. As such, no adjustment to base formula rate plan revenue was required. Adjustments, however, were required under the formula rate plan; the 2016 formula rate plan evaluation report showed a decrease in formula rate plan revenue of approximately $16.9 million, comprised of a decrease in legacy Entergy Louisiana formula rate plan revenue of $3.5 million, a decrease in legacy Entergy Gulf States Louisiana formula rate plan revenue of $9.7 million, and a decrease in incremental formula rate plan revenue of $3.7 million. Additionally, the formula rate plan evaluation report called for a decrease of $40.5 million in the MISO cost recovery revenue requirement from the present level of $46.8 million to $6.3 million. Rates reflecting these adjustments were implemented with the first billing cycle of September 2017, subject to refund. In September 2017 the LPSC issued its report indicating that no changes to Entergy Louisiana’s original formula rate plan evaluation report were required but reserved for several issues, including Entergy Louisiana’s September 2017 update to its formula rate plan evaluation report.

Formula Rate Plan Extension Request

In August 2017, Entergy Louisiana filed a request with the LPSC seeking to extend its formula rate plan for three years (2017-2019) with limited modifications to its terms.  Those modifications include: a one-time resetting of base rates to the midpoint of the band at Entergy Louisiana’s authorized return on equity of 9.95% for the 2017 test year; narrowing of the formula rate plan bandwidth from a total of 160 basis points to 80 basis points; and a forward-looking mechanism that would allow Entergy Louisiana to recover certain transmission-related costs contemporaneously with when those projects begin delivering benefits to customers.  Entergy Louisiana requested that the LPSC consider its request on an expedited basis, in an effort to maintain Entergy Louisiana’s current cycle for implementing rate adjustments, i.e., September 2018, without the need for filing a full base rate case proceeding. Several parties have intervened in the proceeding and all parties have been participating in settlement discussions.

Waterford 3 Replacement Steam Generator Project

Following the completion of the Waterford 3 replacement steam generator project, the LPSC undertook a prudence review in connection with a filing made by Entergy Louisiana in April 2013 with regard to the following aspects of the replacement project: 1) project management; 2) cost controls; 3) success in achieving stated objectives; 4) the costs of the replacement project; and 5) the outage length and replacement power costs. In July 2014 the LPSC staff filed testimony recommending potential project and replacement power cost disallowances of up to $71 million, citing a need for further explanation or documentation from Entergy Louisiana.  An intervenor filed testimony recommending disallowance of $141 million of incremental project costs, claiming the steam generator fabricator was imprudent.  Entergy Louisiana provided further documentation and explanation requested by the LPSC staff. An evidentiary hearing was held in December 2014. At the hearing the parties maintained the positions reflected in pre-filed testimony. Entergy Louisiana believed that the replacement steam generator costs were prudently incurred and applicable legal principles supported their recovery in rates.  Nevertheless, Entergy Louisiana recorded a write-off of $16 million of Waterford 3’s plant balance in December 2014 because of the uncertainty at the time associated with the resolution of the prudence review. In December 2015 the ALJ issued a proposed recommendation, which was subsequently finalized, concluding that Entergy Louisiana prudently managed the Waterford 3 replacement steam generator project, including the selection, use, and oversight of contractors, and could not reasonably have anticipated the damage to the steam generators. Nevertheless, the ALJ concluded that Entergy Louisiana was liable for the conduct of its contractor and subcontractor and, therefore, recommended a disallowance of $67 million in capital costs. Additionally, the ALJ concluded that Entergy Louisiana did not sufficiently justify the incurrence of $2 million in replacement power costs during the replacement outage. Although the ALJ’s recommendation had not yet been considered by the LPSC, after considering the progress of the proceeding in light of the ALJ recommendation, Entergy Louisiana recorded in the fourth quarter 2015 approximately $77 million in charges, including a $45 million asset write-off and a $32 million regulatory charge, to reflect that a portion of the assets associated with the Waterford 3 replacement steam generator project was no longer probable of recovery. Entergy Louisiana maintained that the ALJ’s recommendation contained significant factual and legal errors.

In October 2016 the parties reached a settlement in this matter. The settlement was approved by the LPSC in December 2016. The settlement effectively provided for an agreed-upon disallowance of $67 million of plant, which had been previously written off by Entergy Louisiana, as discussed above. The refund to customers of approximately $71 million as a result of the settlement approved by the LPSC was made to customers in January 2017. Of the $71 million of refunds, $68 million was credited to customers through Entergy Louisiana’s formula rate plan, outside of sharing, and $3 million through its fuel adjustment clause. Entergy Louisiana had previously recorded a provision of $48 million for this refund. The previously-recorded provision included the cumulative revenues recorded through December 2016 related to the $67 million of disallowed plant. An additional regulatory charge of $23 million was recorded in fourth quarter 2016 to reflect the effects of the settlement. The settlement also provided that Entergy Louisiana could retain the value associated with potential service credits agreed to by the project contractor, to the extent they are realized in the future. Following a review by the parties, an unopposed joint report of proceedings was filed by the LPSC staff and Entergy Louisiana in May 2017 and the LPSC accepted the joint report of proceedings resolving the matter.

Ninemile 6

In July 2014, Entergy Gulf States Louisiana and Entergy Louisiana filed an unopposed stipulation with the LPSC, which was subsequently approved, that estimated a first year revenue requirement associated with Ninemile 6 and provided a mechanism to update the revenue requirement as the in-service date approached. In late-December 2014, roughly contemporaneous with the unit's placement in service, a final updated estimated revenue requirement of $26.8 million for Entergy Gulf States Louisiana and $51.1 million for Entergy Louisiana was filed. The December 2014 estimate formed the basis of rates implemented effective with the first billing cycle of January 2015. In July 2015, Entergy Louisiana submitted to the LPSC a compliance filing including an estimate at completion, inclusive of interconnection costs and transmission upgrades, of approximately $648 million, or $76 million less than originally estimated, along with other project details and supporting evidence, to enable the LPSC to review the prudence of Entergy Louisiana’s management of the project. Testimony filed by the LPSC staff generally supported the prudence of the management of the project and recovery of the costs incurred to complete the project. The LPSC staff had questioned the warranty coverage for one element of the project. In October 2016 all parties agreed to a stipulation providing that 100% of Ninemile 6 construction costs was prudently incurred and is eligible for recovery from customers, but reserving the LPSC’s rights to review the prudence of Entergy Louisiana’s actions regarding one element of the project. This stipulation was approved by the LPSC in January 2017.

Union Power Station and Deactivation or Retirement Decisions for Entergy Louisiana Plants

In January 2015, Entergy Gulf States Louisiana filed its application with the LPSC for approval of the acquisition and cost recovery of two power blocks of the Union Power Station for an expected base purchase price of approximately $237 million per power block, subject to adjustments. In September 2015, Entergy Gulf States Louisiana agreed to settlement terms with all parties for Entergy Gulf States Louisiana’s purchase of the two power blocks. In October 2015 the LPSC voted unanimously to approve the uncontested settlement which finds, among other things, that acquisition of Power Blocks 3 and 4 is in the public interest and, therefore, prudent. The business combination of Entergy Gulf States Louisiana and Entergy Louisiana received regulatory approval and closed in October 2015 making Entergy Louisiana the named purchaser of Power Blocks 3 and 4 of the Union Power Station. In March 2016, Entergy Louisiana acquired Power Blocks 3 and 4 of Union Power Station for an aggregate purchase price of approximately $474 million and implemented rates to collect the estimated first-year revenue requirement with the first billing cycle of March 2016.

As a term of the LPSC-approved settlement authorizing the purchase of Power Blocks 3 and 4 of the Union Power Station, Entergy Louisiana agreed to make a filing with the LPSC to review its decisions to deactivate Ninemile 3 and Willow Glen 2 and 4 and its decision to retire Little Gypsy 1.  In January 2016, Entergy Louisiana made its compliance filing with the LPSC. Entergy Louisiana, LPSC staff, and intervenors participated in a technical conference in March 2016 where Entergy Louisiana presented information on its deactivation/retirement decisions for these four units in addition to information on the current deactivation decisions for the ten-year planning horizon. Parties have requested further proceedings on the prudence of the decision to deactivate Willow Glen 2 and 4.  No party contests the prudence of the decision to deactivate Willow Glen 2 and 4 or suggests reactivation of these units; however, issues have been raised related to Entergy Louisiana’s decision to give up its transmission service rights in MISO for Willow Glen 2 and 4 rather than placing the units into suspended status for the three-year term permitted by MISO. An evidentiary hearing was held in August 2017 and post-hearing briefs were submitted in October 2017. A decision is expected in 2018.

Retail Rates - Gas 

In accordance with the settlement of Entergy Gulf States Louisiana’s gas rate stabilization plan for the test year ended September 30, 2012, in August 2014, Entergy Gulf States Louisiana submitted for consideration a proposal for implementation of an infrastructure rider to recover expenditures associated with strategic plant investment and relocation projects mandated by local governments. After review by the LPSC staff and inclusion of certain customer safeguards required by the LPSC staff, in December 2014, Entergy Gulf States Louisiana and the LPSC staff submitted a joint settlement for implementation of an accelerated gas pipe replacement program providing for the replacement of approximately 100 miles of pipe over the next ten years, as well as relocation of certain existing pipe resulting from local government-related infrastructure projects, and for a rider to recover the investment associated with these projects. The rider allows for recovery of approximately $65 million over ten years. The rider recovery will be adjusted on a quarterly basis to include actual investment incurred for the prior quarter and is subject to the following conditions, among others: a ten-year term; application of any earnings in excess of 10.45% as an offset to the revenue requirement of the infrastructure rider; adherence to a specified spending plan, within plus or minus 20% annually; annual filings comparing actual versus planned rider spending with actual spending and explanation of variances exceeding 10%; and an annual true-up. The joint settlement was approved by the LPSC in January 2015. Implementation of the infrastructure rider commenced with bills rendered on and after the first billing cycle of April 2015.

2014 Rate Stabilization Plan Filing

In January 2015, Entergy Gulf States Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2014.  The filing showed an earned return on common equity of 7.20%, which resulted in a $706 thousand rate increase.  In April 2015 the LPSC issued findings recommending two adjustments to Entergy Gulf States Louisiana’s as-filed results, and an additional recommendation that did not affect the results. The LPSC staff’s recommended adjustments increase the earned return on equity for the test year to 7.24%. Entergy Gulf States Louisiana accepted the LPSC staff’s recommendations and a revenue increase of $688 thousand was implemented with the first billing cycle of May 2015.

2015 Rate Stabilization Plan Filing

In January 2016, Entergy Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2015. The filing showed an earned return on common equity of 10.22%, which is within the authorized bandwidth, therefore requiring no change in rates. In March 2016 the LPSC staff issued its report stating that the 2015 gas rate stabilization plan filing was in compliance with the exception of several issues that required additional information, explanation, or clarification for which the LPSC staff had reserved the right to further review. In July 2016 the parties to the proceeding filed an unopposed joint report and motion for entry of order accepting the report that indicated no outstanding issues remained in the filing.

In February 2016, Entergy Louisiana filed a motion requesting to extend the term of the gas rate stabilization plan in substantially similar form for an additional three-year term and included a request for sharing of non-jurisdictional compressed natural gas revenues. Following discovery and the filing of testimony by the LPSC staff, Entergy Louisiana and the LPSC submitted a joint motion for hearing an uncontested stipulated settlement resolving the proceeding. A hearing on the stipulation was held in November 2016. The ALJ issued a report of proceedings that was presented with the parties’ stipulation to the LPSC for consideration. The stipulation approving Entergy Louisiana’s requested extension of the rate stabilization plan was approved by the LPSC in December 2016.

2016 Rate Stabilization Plan Filing

In January 2017, Entergy Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2016. The filing of the evaluation report for test year 2016 reflected an earned return on common equity of 6.37%. As part of the original filing, pursuant to the extraordinary cost provision of the rate stabilization plan, Entergy Louisiana sought to recover approximately $1.5 million in deferred operation and maintenance expenses incurred to restore service and repair damage resulting from flooding and widespread rainfall in southeast Louisiana that occurred in August 2016. Entergy Louisiana requested to recover the prudently incurred August 2016 storm restoration costs over ten years, outside of the rate stabilization plan sharing provisions. As a result, Entergy Louisiana’s filing sought an annual increase in revenue of $1.4 million. Following review of the filing, except for the proposed extraordinary cost recovery, the LPSC staff confirmed Entergy Louisiana’s filing was consistent with the principles and requirements of the rate stabilization plan. The extraordinary cost recovery request associated with the 2016 flood-related deferred operation and maintenance expenses incurred for gas operations was removed from the rate stabilization plan pending LPSC consideration in a separate docket. In April 2017 the LPSC approved a joint report of proceedings and Entergy Louisiana submitted a revised evaluation report reflecting a $1.2 million annual increase in revenue with rates implemented with the first billing cycle of May 2017.

In connection with the joint report of proceedings accepted by the LPSC, in May 2017, Entergy Louisiana filed an application to initiate a separate proceeding to recover through the extraordinary cost provision of the gas rate stabilization plan the deferred operation and maintenance expenses of $1.4 million incurred to restore service and repair damage resulting from flooding and widespread rainfall in southeast Louisiana that occurred in August 2016. The LPSC staff submitted its direct testimony in the proceeding recommending recovery of $0.9 million. Entergy Louisiana filed rebuttal testimony responding to the LPSC staff’s recommendation. The procedural schedule was suspended to allow the parties to engage in settlement negotiations, and in February 2018 the LPSC staff and Entergy Louisiana filed an unopposed settlement. If approved by the LPSC, the settlement would provide for Entergy Louisiana to recover, over ten years, the approximately $1.4 million in deferred operation and maintenance expense and related carrying charges. The settlement further provides for recovery to commence in May 2018.

2017 Rate Stabilization Plan Filing

In January 2018, Entergy Louisiana filed with the LPSC its gas rate stabilization plan for test year ended September 30, 2017.  The filing of the evaluation report for the test year 2017 reflected an earned return on common equity of 9.06%.  This earned return is below the earnings sharing band of the rate stabilization plan and results in a rate increase of $0.1 million.  Due to the enactment in late-December 2017 of the Tax Cuts and Jobs Act, Entergy Louisiana did not have adequate time to reflect the effects of this tax legislation in the rate stabilization plan.  As a result, Entergy Louisiana will file a supplement to the January 2018 evaluation report to reflect, among other things, a 21% federal corporate income tax rate.  Any rate change resulting from the revised rate stabilization plan will become effective in rates in May 2018.

Filings with the MPSC (Entergy Mississippi)

Formula Rate Plan Filings

In March 2016, Entergy Mississippi submitted its formula rate plan 2016 test year filing showing Entergy Mississippi’s projected earned return for the 2016 calendar year to be below the formula rate plan bandwidth. The filing showed a $32.6 million rate increase was necessary to reset Entergy Mississippi’s earned return on common equity to the specified point of adjustment of 9.96%, within the formula rate plan bandwidth. In June 2016 the MPSC approved Entergy Mississippi’s joint stipulation with the Mississippi Public Utilities Staff. The joint stipulation provided for a total revenue increase of $23.7 million. The revenue increase includes a $19.4 million increase through the formula rate plan, resulting in a return on common equity point of adjustment of 10.07%. The revenue increase also includes $4.3 million in incremental ad valorem tax expenses to be collected through an updated ad valorem tax adjustment rider. The revenue increase and ad valorem tax adjustment rider were effective with the July 2016 bills.

In March 2017, Entergy Mississippi submitted its formula rate plan 2017 test year filing and 2016 look-back filing showing Entergy Mississippi’s earned return for the historical 2016 calendar year and projected earned return for the 2017 calendar year to be within the formula rate plan bandwidth, resulting in no change in rates. In June 2017, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a stipulation that confirmed that Entergy Mississippi’s earned returns for both the 2016 look-back filing and 2017 test year were within the respective formula rate plan bandwidths. In June 2017 the MPSC approved the stipulation, which resulted in no change in rates.

Filings with the City Council (Entergy New Orleans)

Retail Rates

See “Algiers Asset Transfer” below for discussion of the Algiers asset transfer. As a provision of the settlement agreement approved by the City Council in May 2015 providing for the Algiers asset transfer, it was agreed that, with limited exceptions, no action may be taken with respect to Entergy New Orleans’s base rates until rates are implemented from a base rate case that must be filed for its electric and gas operations in 2018. This provision eliminated the formula rate plan applicable to Algiers operations. The limited exceptions included continued implementation of the then-remaining two years of the four-year phased-in rate increase for the Algiers area and certain exceptional cost increases or decreases in the base revenue requirement. An additional provision of the settlement agreement allowed for continued recovery of the revenue requirement associated with the capacity and energy from Ninemile 6 received by Entergy New Orleans under a power purchase agreement with Entergy Louisiana (Algiers PPA). The settlement authorized Entergy New Orleans to recover the remaining revenue requirement related to the Algiers PPA through base rates charged to Algiers customers. The settlement also provided for continued implementation of the Algiers MISO recovery rider.

In addition to the Algiers PPA, Entergy New Orleans has a separate power purchase agreement with Entergy Louisiana for 20% of the capacity and energy from Ninemile 6 (Ninemile PPA), which commenced operation in December 2014. Initially, recovery of the non-fuel costs associated with the Ninemile PPA was authorized through a special Ninemile 6 rider billed only to Entergy New Orleans customers outside of Algiers.

In August 2015, Entergy New Orleans filed an application with the City Council seeking authorization to proceed with the purchase of Union Power Block 1, with an expected base purchase price of approximately $237 million, subject to adjustments, and seeking approval of the recovery of the associated costs. In November 2015 the City Council issued written resolutions and an order approving an agreement in principle between Entergy New Orleans and City Council advisors providing that the purchase of Union Power Block 1 and related assets by Entergy New Orleans is prudent and in the public interest. The City Council authorized expansion of the terms of the purchased power and capacity acquisition cost recovery rider to recover the non-fuel purchased power expense from Ninemile 6, the revenue requirement associated with the purchase of Power Block 1 of the Union Power Station, and a credit to customers of $400 thousand monthly beginning June 2016 in recognition of the decrease in other operation and maintenance expenses that would result with the deactivation of Michoud Units 2 and 3. In March 2016, Entergy New Orleans purchased Power Block 1 of the Union Power Station for approximately $237 million and initiated recovery of these costs with March 2016 bills. In July 2016, Entergy New Orleans and the City Council Utility Committee agreed to a temporary increase in the Michoud credit to customers to a total of $1.4 million monthly for August 2016 through December 2016.

A 2008 rate case settlement included $3.1 million per year in electric rates to fund the Energy Smart energy efficiency programs.  The rate settlement provided an incentive for Entergy New Orleans to meet or exceed energy savings targets set by the City Council and provided a mechanism for Entergy New Orleans to recover lost contribution to fixed costs associated with the energy savings generated from the energy efficiency programs. In January 2015 the City Council approved funding for the Energy Smart program from April 2015 through March 2017 using the remainder of the approximately $12.8 million of 2014 rough production cost equalization funds, with any remaining costs being recovered through the fuel adjustment clause. This funding methodology was modified in November 2015 when the City Council directed Entergy New Orleans to use a combination of guaranteed customer savings related to a prior agreement with the City Council and rough production cost equalization funds to cover program costs prior to recovering any costs through the fuel adjustment clause. In April 2017 the City Council approved an implementation plan for the Energy Smart program from April 2017 through December 2019. The City Council directed that the $11.8 million balance reported for Energy Smart funds be used to continue funding the program for Entergy New Orleans’s legacy customers and that the Energy Smart Algiers program continue to be funded through the Algiers fuel adjustment clause, until additional customer funding is required for the legacy customers. In September 2017, Entergy New Orleans filed a supplemental plan and proposed several options for an interim cost recovery mechanism necessary to recover program costs during the period between when existing funds directed to Energy Smart programs are depleted (estimated to be June 2018) and when new rates from the anticipated 2018 combined rate case, which will include a cost recovery mechanism for Energy Smart funding, take effect (estimated to be August 2019). Entergy New Orleans requested that the City Council approve a cost recovery mechanism prior to June 2018. In December 2017 the City Council approved an energy efficiency cost recovery rider as an interim funding mechanism for Energy Smart, subject to verification that no additional funding sources exist.

Internal Restructuring

In July 2016, Entergy New Orleans filed an application with the City Council seeking authorization to undertake a restructuring that would result in the transfer of substantially all of the assets and operations of Entergy New Orleans, Inc. to a new entity, which would ultimately be owned by an existing Entergy subsidiary holding company. The restructuring was subject to regulatory review and approval by the City Council and the FERC. In May 2017 the City Council adopted a resolution approving the proposed internal restructuring pursuant to an agreement in principle with the City Council advisors and certain intervenors. Pursuant to the agreement in principle, Entergy New Orleans would credit retail customers $10 million in 2017, $1.4 million in the first quarter of the year after the transaction closes, and $117,500 each month in the second year after the transaction closes until such time as new base rates go into effect as a result of the anticipated 2018 base rate case. Entergy New Orleans began crediting retail customers in June 2017. In June 2017 the FERC approved the transaction and, pursuant to the agreement in principle, Entergy New Orleans will provide additional credits to retail customers of $5 million in each of the years 2018, 2019, and 2020.

In November 2017, pursuant to the agreement in principle, Entergy New Orleans undertook a multi-step restructuring, including the following:

Entergy New Orleans, Inc. redeemed its outstanding preferred stock at a price of approximately $21 million, which included a call premium of approximately $819,000, plus any accumulated and unpaid dividends.
Entergy New Orleans, Inc. converted from a Louisiana corporation to a Texas corporation.
Under the Texas Business Organizations Code (TXBOC), Entergy New Orleans, Inc. allocated substantially all of its assets to a new subsidiary, Entergy New Orleans Power, LLC, a Texas limited liability company (Entergy New Orleans Power), and Entergy New Orleans Power assumed substantially all of the liabilities of Entergy New Orleans, Inc., in a transaction regarded as a merger under the TXBOC. Entergy New Orleans, Inc. remained in existence and held the membership interests in Entergy New Orleans Power.
Entergy New Orleans, Inc. contributed the membership interests in Entergy New Orleans Power to an affiliate (Entergy Utility Holding Company, LLC, a Texas limited liability company and subsidiary of Entergy Corporation). As a result of the contribution, Entergy New Orleans Power is a wholly-owned subsidiary of Entergy Utility Holding Company, LLC.

In December 2017, Entergy New Orleans, Inc. changed its name to Entergy Utility Group, Inc., and Entergy New Orleans Power then changed its name to Entergy New Orleans, LLC. Entergy New Orleans, LLC holds substantially all of the assets, and has assumed substantially all of the liabilities, of Entergy New Orleans, Inc. The restructuring was accounted for as a transaction between entities under common control.

Filings with the PUCT and Texas Cities (Entergy Texas)

Retail Rates

2011 Rate Case

In November 2011, Entergy Texas filed a rate case requesting a $112 million base rate increase reflecting a 10.6% return on common equity based on an adjusted June 2011 test year.  The rate case also proposed a purchased power recovery rider.  On January 12, 2012, the PUCT voted not to address the purchased power recovery rider in the rate case, but the PUCT voted to set a baseline in the rate case proceeding that would be applicable if a purchased power capacity rider is approved in a separate proceeding.  In April 2012 the PUCT Staff filed direct testimony recommending a base rate increase of $66 million and a 9.6% return on common equity.  The PUCT Staff, however, subsequently filed a statement of position in the proceeding indicating that it was still evaluating the position it would ultimately take in the case regarding Entergy Texas’s recovery of purchased power capacity costs and Entergy Texas’s proposal to defer its MISO transition expenses.  In April 2012, Entergy Texas filed rebuttal testimony indicating a revised request for a $105 million base rate increase.  A hearing was held in late-April through early-May 2012.

In September 2012 the PUCT issued an order approving a $28 million rate increase, effective July 2012.  The order included a finding that “a return on common equity (ROE) of 9.80 percent will allow [Entergy Texas] a reasonable opportunity to earn a reasonable return on invested capital.”  The order also provided for increases in depreciation rates and the annual storm reserve accrual.  The order also reduced Entergy Texas’s proposed purchased power capacity costs, stating that they are not known and measurable; reduced Entergy Texas’s regulatory assets associated with Hurricane Rita; excluded from rate recovery capitalized financially-based incentive compensation; included $1.6 million of MISO transition expense in base rates; and reduced Entergy’s Texas’s fuel reconciliation recovery by $4 million because the PUCT disagreed with the line-loss factor used in the calculation.  After considering the progress of the proceeding in light of the PUCT order, Entergy Texas recorded in the third quarter 2012 an approximate $24 million charge to recognize that assets associated with Hurricane Rita, financially-based incentive compensation, and fuel recovery are no longer probable of recovery.  Entergy Texas believed that it was entitled to recover these prudently incurred costs, however, and it filed a motion for rehearing regarding these and several other issues in the PUCT’s order on October 4, 2012.  Several other parties also filed motions for rehearing of the PUCT’s order.  The PUCT subsequently denied rehearing of substantive issues.  Several parties, including Entergy Texas, appealed various aspects of the PUCT’s order to the Travis County District Court. A hearing was held in July 2014. In October 2014 the Travis County District Court issued an order upholding the PUCT’s decision except as to the line-loss factor issue referenced above, which was found in favor of Entergy Texas. In November 2014, Entergy Texas and other parties, including the PUCT, appealed the Travis County District Court decision to the Third Court of Appeals. Oral argument before the court panel was held in September 2015. In April 2016 the Third Court of Appeals issued its opinion affirming the District Court’s decision on all points. Entergy Texas petitioned the Texas Supreme Court to hear its appeal of the Third Court’s ruling. In September 2017 the Texas Supreme Court denied the petitions for review. Entergy Texas filed a motion for rehearing of the Texas Supreme Court’s denial of the petition for review. In January 2018 the Texas Supreme Court denied Entergy Texas’s motion for rehearing.

Distribution cost recovery factor (DCRF) rider

In September 2015, Entergy Texas filed to amend its DCRF rider. Entergy Texas requested an increase in recovery under the rider of $6.5 million, for a total collection of $10.1 million annually from retail customers. In October 2015 intervenors and PUCT staff filed testimony opposing, in part, Entergy Texas’s request. In November 2015, Entergy Texas and the parties filed an unopposed settlement agreement and supporting documents. The settlement established an annual revenue requirement of $8.65 million for the amended DCRF rider, with the resulting rates effective for usage on and after January 1, 2016. The PUCT approved the settlement agreement in February 2016.

In June 2017, Entergy Texas filed an application to amend its DCRF rider by increasing the total collection from $8.65 million to approximately $19 million. In July 2017, Entergy Texas, the PUCT, and the two other parties in the proceeding entered into an unopposed stipulation and settlement agreement resulting in an amended DCRF annual revenue requirement of $18.3 million, with the resulting rates effective for usage no later than October 1, 2017. In September 2017 the PUCT issued its final order approving the unopposed stipulation and settlement agreement. The amended DCRF rider rates became effective for usage on and after September 1, 2017.
    
Transmission cost recovery factor (TCRF) rider

In September 2015, Entergy Texas filed for a TCRF rider requesting a $13 million increase, incremental to base rates. Testimony was filed in November 2015, with the PUCT staff and other parties proposing various disallowances involving, among other things, MISO charges, vegetation management costs, and bad debt expenses that would reduce the requested increase by approximately $2 million. In addition to those recommended disallowances, a number of parties recommended that Entergy Texas’s request be reduced by an additional $3.4 million to account for load growth since base rates were last set. A hearing on the merits was held in December 2015. In February 2016 a State Office of Administrative Hearings ALJ issued a proposal for decision recommending that the PUCT disallow approximately $2 million from Entergy Texas’s $13 million request, but recommending that the PUCT not accept the load growth offset. In June 2016 the PUCT indicated that it would take up in a future rulemaking project the issue of whether a load growth adjustment should apply to a TCRF. In July 2016 the PUCT issued an order generally accepting the proposal for decision but declining to adjust the TCRF baseline in two instances as recommended by the ALJ, which resulted in a total annual allowance of approximately $10.5 million. The PUCT also ordered its staff and Entergy Texas to track all spare autotransformer transfers going forward so that it could address the appropriate accounting treatment and prudence of such transfers in Entergy Texas’s next base rate case. Entergy Texas implemented the TCRF rider beginning with September 2016 bills.

In September 2016, Entergy Texas filed with the PUCT a request to amend its TCRF rider. The proposed amended TCRF rider is designed to collect approximately $29.5 million annually from Entergy Texas’s retail customers. This amount includes the approximately $10.5 million annually that Entergy Texas is currently authorized to collect through the TCRF rider, as discussed above. In December 2016, concurrent with the 2016 fuel reconciliation stipulation and settlement agreement discussed above, Entergy Texas and the PUCT reached a settlement agreeing to the amended TCRF annual revenue requirement of $29.5 million. As discussed above, the terms of the two settlements are interdependent. The PUCT approved the settlement and issued a final order in March 2017. Entergy Texas implemented the amended TCRF rider beginning with bills covering usage on and after March 20, 2017.

Advanced Metering Infrastructure (AMI) Filings

Entergy Arkansas

In September 2016, Entergy Arkansas filed an application seeking a finding from the APSC that Entergy Arkansas’s deployment of AMI is in the public interest. Entergy Arkansas proposed to replace existing meters with advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems. AMI is intended to serve as the foundation of Entergy Arkansas’s modernized power grid. The filing included an estimate of implementation costs for AMI of $208 million. The filing identified a number of quantified and unquantified benefits, and Entergy Arkansas provided a cost benefit analysis showing that its AMI deployment is expected to produce a nominal net benefit to customers of $406 million. Entergy Arkansas also sought to continue to include in rate base the remaining book value of existing meters, which was approximately $57 million at December 31, 2015, that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates. Entergy Arkansas proposed a 15-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019. Deployment of the communications network is expected to begin in 2018. Entergy Arkansas proposed to include the AMI deployment costs and the quantified benefits in future formula rate plan filings, and the 2018 costs were approved in the 2017 formula rate plan filing. In June 2017 the APSC staff and Arkansas Attorney General filed direct testimony. The APSC staff generally supported Entergy Arkansas’s AMI deployment conditioned on various recommendations. The Arkansas Attorney General’s consultant primarily recommended denial of Entergy Arkansas’s application but alternatively suggested recommendations in the event the APSC approves Entergy Arkansas’s proposal. Entergy Arkansas filed rebuttal testimony in June 2017, substantially accepting the APSC staff’s recommendations. In August 2017, Entergy Arkansas and the parties to the proceeding filed a joint motion to approve a unanimous settlement agreement. In October 2017 the APSC issued an order finding that Entergy Arkansas’s AMI deployment is in the public interest and approving the settlement agreement subject to a minor modification. Entergy Arkansas expects to recover the undepreciated balance of its existing meters through a regulatory asset to be amortized over 15 years. Entergy Arkansas has begun discussions with the other parties to implement the items in the settlement agreement including pre-pay and time of use programs.

Entergy Louisiana

In November 2016, Entergy Louisiana filed an application seeking a finding from the LPSC that Entergy Louisiana’s deployment of advanced electric and gas metering infrastructure is in the public interest. Entergy Louisiana proposed to deploy advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems. AMI is intended to serve as the foundation of Entergy Louisiana’s modernized power grid. The filing included an estimate of implementation costs for AMI of $330 million. The filing identified a number of quantified and unquantified benefits, and Entergy Louisiana provided a cost/benefit analysis showing that its combined electric and gas AMI deployment is expected to produce a nominal net benefit to customers of $607 million. Entergy Louisiana also sought to continue to include in rate base the remaining book value, approximately $92 million at December 31, 2015, of the existing electric meters and also to depreciate those assets using current depreciation rates. Entergy Louisiana proposed a 15-year useful life for the new advanced meters, the three-year deployment of which is expected to begin in 2019. The communications network deployment is expected to begin by late-2018, after the necessary information technology infrastructure is in place. Entergy Louisiana proposed to recover the cost of AMI through the implementation of a customer charge, net of certain benefits, phased in over the period 2019 through 2022. The parties reached an uncontested stipulation permitting implementation of Entergy Louisiana’s proposed AMI system, with modifications to the proposed customer charge. In July 2017 the LPSC approved the stipulation. Entergy Louisiana expects to recover the undepreciated balance of its existing meters through a regulatory asset to be amortized at current depreciation rates.

Entergy Mississippi

In November 2016, Entergy Mississippi filed an application seeking an order from the MPSC granting a certificate of public convenience and necessity and finding that Entergy Mississippi’s deployment of AMI is in the public interest. Entergy Mississippi proposed to replace existing meters with advanced meters that enable two-way data communication; to design and build a secure and reliable network to support such communications; and to implement support systems. AMI is intended to serve as the foundation of Entergy Mississippi’s modernized power grid. The filing included an estimate of implementation costs for AMI of $132 million. The filing identified a number of quantified and unquantified benefits, and Entergy Mississippi provided a cost benefit analysis showing that its AMI deployment is expected to produce a nominal benefit to customers of $496 million over a 15-year period, which when netted against the costs of AMI results in $183 million of net customer benefits. Entergy Mississippi also sought to continue to include in rate base the remaining book value, approximately $56 million at December 31, 2015, of existing meters that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates. Entergy Mississippi proposed a 15-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019, subject to approval by the MPSC, with deployment of the communications network expected to begin in 2018. Entergy Mississippi proposed to include the AMI deployment costs and the quantified benefits in existing rate mechanisms, primarily through future formula rate plan filings and/or future energy cost recovery rider schedule re-determinations, as applicable. In May 2017 the Mississippi Public Utilities Staff and Entergy Mississippi entered into and filed a joint stipulation supporting Entergy Mississippi’s filing, and the MPSC issued an order approving the filing without material changes, finding that Entergy Mississippi’s deployment of AMI is in the public interest and granting a certificate of public convenience and necessity. The MPSC order also confirmed that Entergy Mississippi shall continue to include in rate base the remaining book value of existing meters that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates.

Entergy New Orleans

In October 2016, Entergy New Orleans filed an application seeking a finding from the City Council that Entergy New Orleans’s deployment of advanced electric and gas metering infrastructure is in the public interest.  Entergy New Orleans proposed to deploy advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems.  AMI is intended to serve as the foundation of Entergy New Orleans’s modernized power grid.  The filing included an estimate of implementation costs for AMI of $75 million. The filing identified a number of quantified and unquantified benefits, and Entergy New Orleans provided a cost/benefit analysis showing that its combined electric and gas AMI deployment is expected to produce a nominal net benefit to customers of $101 million.  Entergy New Orleans also sought to continue to include in rate base the remaining book value, approximately $21 million at December 31, 2015, of the existing electric meters and also to depreciate those assets using current depreciation rates.  Entergy New Orleans proposed a 15-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019.  Deployment of the information technology infrastructure began in 2017 and deployment of the communications network is expected to begin in 2018.  Entergy New Orleans proposed to recover the cost of AMI through the implementation of a customer charge, net of certain benefits, phased in over the period 2019 through 2022.  The City Council’s advisors filed testimony in May 2017 recommending the adoption of AMI subject to certain modifications, including the denial of Entergy New Orleans’s proposed customer charge as a cost recovery mechanism. In January 2018 a settlement was reached between the City Council’s advisors and Entergy New Orleans. In February 2018 the City Council approved the settlement, which deferred cost recovery to the 2018 Entergy New Orleans rate case, but also stated that an adjustment for 2018-2019 AMI costs can be filed in the rate case and that, for all subsequent AMI costs, the mechanism to be approved in the 2018 rate case will allow for the timely recovery of such costs.

Entergy Texas

In April 2017 the Texas legislature enacted legislation that extends statutory support for AMI deployment to Entergy Texas and directs that if Entergy Texas elects to deploy AMI, it shall do so as rapidly as practicable. In July 2017, Entergy Texas filed an application seeking an order from the PUCT approving Entergy Texas’s deployment of AMI. Entergy Texas proposed to replace existing meters with advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems. AMI is intended to serve as the foundation of Entergy Texas’s modernized power grid. The filing included an estimate of implementation costs for AMI of $132 million. The filing identified a number of quantified and unquantified benefits, with Entergy Texas showing that its AMI deployment is expected to produce nominal net operational cost savings to customers of $33 million. Entergy Texas also sought to continue to include in rate base the remaining book value, approximately $41 million at December 31, 2016, of existing meters that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates. Entergy Texas proposed a seven-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019. Entergy Texas also proposed a surcharge tariff to recover the reasonable and necessary costs it has and will incur under the deployment plan for the full deployment of advanced meters. Further, Entergy Texas sought approval of fees that would be charged to customers who choose to opt out of receiving service through an advanced meter and instead receive electric service with a non-standard meter. In October 2017, Entergy Texas and other parties entered into and filed an unopposed stipulation and settlement agreement, permitting deployment of AMI with limited modifications. The PUCT approved the stipulation and settlement agreement in December 2017. Consistent with the approval, deployment of the communications network is expected to begin in 2018. Entergy Texas expects to recover the remaining net book value of its existing meters through a regulatory asset to be amortized at current depreciation rates.

Entergy Louisiana and Entergy Gulf States Louisiana Business Combination

Entergy Louisiana and Entergy Gulf States Louisiana filed an application with the LPSC in September 2014 seeking authorization to undertake transactions that would result in the combination of Entergy Louisiana and Entergy Gulf States Louisiana into a single public utility. An uncontested stipulated settlement (stipulated settlement) was filed with the LPSC in July 2015. Through the stipulated settlement, the parties agreed to terms upon which to recommend that the LPSC find that the business combination was in the public interest. The stipulated settlement, which was either joined, or unopposed, by all parties to the LPSC proceeding, represented a compromise of stakeholder positions and was the result of an extensive period of analysis, discovery, and negotiation. The stipulated settlement provided $107 million in guaranteed customer benefits during the first nine years following the transaction’s close. Additionally, the combined company would honor the 2013 Entergy Louisiana and Entergy Gulf States Louisiana rate case settlements, including the commitments that (1) there would be no rate increase for legacy Entergy Gulf States Louisiana customers for the 2014 test year, and (2) through the 2016 test year formula rate plan, Entergy Louisiana (as a combined entity) would not raise rates by more than $30 million, net of the $10 million rate increase included in the Entergy Louisiana legacy formula rate plan. The stipulated settlement also provided that Entergy Gulf States Louisiana and Entergy Louisiana would be permitted to defer certain external costs that were incurred to achieve the business combination’s customer benefits. In 2015 deferrals of $16 million for these external costs were recorded, and they are being amortized over a 10-year period. The LPSC approved the business combination in August 2015.

On October 1, 2015, the businesses formerly conducted by Entergy Louisiana and Entergy Gulf States Louisiana were combined into a single public utility. With the completion of the business combination, Entergy Louisiana holds substantially all of the assets, and has assumed the liabilities, of Entergy Louisiana and Entergy Gulf States Louisiana. The combination was accounted for as a transaction between entities under common control. See Note 3 to the financial statements for further discussion of the customer credits resulting from the business combination.

Algiers Asset Transfer (Entergy Louisiana and Entergy New Orleans)

In October 2014, Entergy Louisiana and Entergy New Orleans filed an application with the City Council seeking authorization to undertake a transaction that would result in the transfer from Entergy Louisiana to Entergy New Orleans of certain assets that supported the provision of service to Entergy Louisiana’s customers in Algiers. In April 2015 the FERC issued an order approving the Algiers assets transfer. In May 2015 the parties filed a settlement agreement authorizing the Algiers assets transfer and the settlement agreement was approved by a City Council resolution in May 2015. On September 1, 2015, Entergy Louisiana transferred its Algiers assets to Entergy New Orleans for a purchase price of approximately $85 million. Entergy New Orleans paid Entergy Louisiana $59.6 million, including final true-ups, from available cash and issued a note payable to Entergy Louisiana in the amount of $25.5 million.

System Agreement Cost Equalization Proceedings

Prior to its final termination in 2016, the Utility operating companies historically engaged in the coordinated planning, construction, and operation of generating and bulk transmission facilities under the terms of the System Agreement.  Entergy Arkansas terminated its participation in the System Agreement in December 2013. Entergy Mississippi terminated its participation in the System Agreement in November 2015. The System Agreement terminated with respect to its remaining participants in August 2016.

Although the System Agreement has terminated, certain of the Utility operating companies’ retail regulators continue to pursue litigation involving the System Agreement at the FERC and in federal courts.  The proceedings include challenges to the allocation of costs as defined by the System Agreement and other matters.

In June 2005 the FERC issued a decision in System Agreement litigation that had been commenced by the LPSC, and essentially affirmed its decision in a December 2005 order on rehearing.  The decision included, among other things:

The FERC’s conclusion that the System Agreement no longer roughly equalizes total production costs among the Utility operating companies.
In order to reach rough production cost equalization, the FERC imposed a bandwidth remedy by which each company’s total annual production costs will have to be within +/- 11% of Entergy System average total annual production costs.
In calculating the production costs for this purpose under the FERC’s order, output from the Vidalia hydroelectric power plant will not reflect the actual Vidalia price for the year but is priced at that year’s average price paid by Entergy Louisiana for the exchange of electric energy under Service Schedule MSS-3 of the System Agreement, thereby reducing the amount of Vidalia costs reflected in the comparison of the Utility operating companies’ total production costs.
The remedy ordered by the FERC in 2005 required no refunds and became effective based on calendar year 2006 production costs and the first reallocation payments were made in 2007.
The FERC’s decision reallocated total production costs of the Utility operating companies whose relative total production costs expressed as a percentage of Entergy System average production costs are outside an upper or lower bandwidth.  This was accomplished by payments from Utility operating companies whose production costs were more than 11% below Entergy System average production costs to Utility operating companies whose production costs were more than the Entergy System average production cost, with payments going first to those Utility operating companies whose total production costs were farthest above the Entergy System average.

The LPSC, APSC, MPSC, and the Arkansas Electric Energy Consumers appealed the FERC’s December 2005 decision to the United States Court of Appeals for the D.C. Circuit.  Entergy and the City of New Orleans intervened in the various appeals.  The D.C. Circuit issued its decision in April 2008.  The D.C. Circuit concluded that the FERC’s orders had failed to adequately explain both its conclusion that it was prohibited from ordering refunds for the 20-month period from September 13, 2001 - May 2, 2003 and its determination to implement the bandwidth remedy commencing on January 1, 2006, rather than June 1, 2005.  The D.C. Circuit remanded the case to the FERC for further proceedings on those two issues.

In October 2011 the FERC issued an order addressing the D.C. Circuit remand on the two issues.  On the first issue, the FERC concluded that it did have the authority to order refunds, but decided that it would exercise its equitable discretion and not require refunds for the 20-month period from September 13, 2001 - May 2, 2003.  Because the ruling on refunds relied on findings in the interruptible load proceeding, which is discussed in a separate section below, the FERC concluded that this refund ruling will be held in abeyance pending the outcome of the rehearing requests in the interruptible load proceeding.  On the second issue, the FERC reversed its prior decision and ordered that the prospective bandwidth remedy begin on June 1, 2005 (the date of its initial order in the proceeding) rather than January 1, 2006, as it had previously ordered.  Pursuant to the October 2011 order, Entergy was required to calculate bandwidth payments for the period June - December 2005 utilizing the bandwidth formula tariff prescribed by the FERC that was filed in a December 2006 compliance filing and accepted by the FERC in an April 2007 order.  

In March 2015, in light of a December 2014 decision by the D.C. Circuit in the interruptible load proceeding, Entergy filed with the FERC a motion to establish a briefing schedule on refund issues and an initial brief addressing refund issues. The initial brief argued that the FERC, in response to the D.C. Circuit decision, should clarify its policy on refunds and find that refunds are not required in this proceeding. In October 2015 the FERC issued three orders related to the commencement of the remedy on June 1, 2005 and the inclusion of interest for the period June 1, 2005 through December 31, 2005. Specifically, the FERC rejected Entergy’s request for rehearing of its decision to include interest for the seven-month period. The FERC also rejected Entergy’s request for rehearing of the order rejecting the compliance filing with regard to the issue of interest. Finally, the FERC set for hearing and settlement procedures the 2014 compliance filing that included the bandwidth calculation for the seven months June 1, 2005 through December 31, 2005. In setting the compliance filing for hearing, the FERC rejected the APSC’s protest that Entergy Arkansas should not be subject to the filing because Entergy Arkansas would be making the payments during a period following its exit from the System Agreement. In January 2018 the D.C.Circuit affirmed the FERC decision that Entergy Arkansas was subject to the filing.

In December 2011, Entergy filed with the FERC its compliance filing that provides the payments and receipts among the Utility operating companies pursuant to the FERC’s October 2011 order.  The APSC, the LPSC, the PUCT, and other parties intervened in the December 2011 compliance filing proceeding, and the APSC and the LPSC also filed protests. The filing shows the following payments/receipts among the Utility operating companies:

 
Payments (Receipts)
 
(In Millions)
Entergy Arkansas
$156
Entergy Louisiana
($75)
Entergy Mississippi
($33)
Entergy New Orleans
($5)
Entergy Texas
($43)


Entergy Arkansas made its payment in January 2012.  In February 2012, Entergy Arkansas filed for an interim adjustment to its production cost allocation rider requesting that the $156 million be collected from customers over the 22-month period from March 2012 through December 2013.  In March 2012 the APSC issued an order stating that the payment can be recovered from retail customers through the production cost allocation rider, subject to refund.  The LPSC and the APSC requested rehearing of the FERC’s October 2011 order.  

In February 2014 the FERC issued a rehearing order addressing its October 2011 order. The FERC denied the LPSC’s request for rehearing on the issues of whether the bandwidth remedy should be made effective earlier than June 1, 2005, and whether refunds should be ordered for the 20-month refund effective period. The FERC granted the LPSC’s rehearing request on the issue of interest on the bandwidth payments/receipts for the June - December 2005 period, requiring that interest be accrued from June 1, 2006 until the date those bandwidth payments/receipts are made. Also in February 2014 the FERC issued an order rejecting the December 2011 compliance filing that calculated the bandwidth payments/receipts for the June - December 2005 period. The FERC order required a new compliance filing that calculates the bandwidth payments/receipts for the June - December 2005 period based on monthly data for the seven individual months including interest pursuant to the February 2014 rehearing order. Entergy sought rehearing of the February 2014 order with respect to the FERC’s determinations regarding interest. In April 2014 the LPSC filed a petition for review of the FERC’s October 2011 and February 2014 orders with the U.S. Court of Appeals for the D.C. Circuit. In August 2017 the D.C. Circuit issued a decision addressing the LPSC’s appeal of the FERC’s October 2011 and February 2014 orders. On the issue of the FERC’s implementation of the prospective remedy as of June 2005 and whether the bandwidth remedy should be extended for an additional 17 months in years 2004-2005, the D.C. Circuit affirmed the FERC’s implementation of the remedy and denied the LPSC’s appeal. On the issue of whether the operating companies should be required to issue refunds for the 20-month period from September 2001 to May 2003, the D.C. Circuit granted the FERC’s request for agency reconsideration and remanded that issue back to the FERC for further proceedings as requested by all parties to the appeal.

In April and May 2014, Entergy filed with the FERC an updated compliance filing that provides the payments and receipts among the Utility operating companies pursuant to the FERC’s February 2014 orders.  The filing shows the following net payments and receipts, including interest, among the Utility operating companies:
 
Payments (Receipts)
 
(In Millions)
Entergy Arkansas
$68
Entergy Louisiana
($10)
Entergy Mississippi
($11)
Entergy New Orleans
$2
Entergy Texas
($49)

These payments were made in May 2014. The LPSC, City Council, and APSC filed protests.

The hearing on the bandwidth calculation for the seven months June 1, 2005 through December 31, 2005 occurred in July 2016. The presiding judge issued an initial decision in November 2016. In the initial decision, the presiding judge agreed with the Utility operating companies’ position that: (1) interest on the bandwidth payments for the 2005 test period should be accrued from June 1, 2006 until the date that the bandwidth payments for that calculation are paid, which is consistent with how the Utility operating companies performed the calculation; and (2) a portion of Entergy Louisiana’s 2001-vintage Louisiana state net operating loss accumulated deferred income tax that results from the Vidalia tax deduction should be excluded from the 2005 test period bandwidth calculation. Various participants filed briefs on exceptions and/or briefs opposing exceptions related to the initial decision, including the LPSC, the APSC, the FERC trial staff, and Entergy Services. The initial decision is pending before the FERC.

Rough Production Cost Equalization Rates

Each May from 2007 through 2016 Entergy filed with the FERC the rates to implement the FERC’s orders in the System Agreement proceeding.  These filings showed the following payments/receipts among the Utility operating companies were necessary to achieve rough production cost equalization as defined by the FERC’s orders:
 
Payments (Receipts)
 
2007
 
2008
 
2009
 
2010
 
2011
 
2012
 
2013
 
2014
 
(In Millions)
Entergy Arkansas

$252

 

$252

 

$390

 

$41

 

$77

 

$41

 

$—

 

$—

Entergy Louisiana

($211
)
 

($160
)
 

($247
)
 

($22
)
 

($12
)
 

($41
)
 

$—

 

$—

Entergy Mississippi

($41
)
 

($20
)
 

($24
)
 

($19
)
 

($40
)
 

$—

 

$—

 

$—

Entergy New Orleans

$—

 

($7
)
 

$—

 

$—

 

($25
)
 

$—

 

($15
)
 

($15
)
Entergy Texas

($30
)
 

($65
)
 

($119
)
 

$—

 

$—

 

$—

 

$15

 

$15



The Utility operating companies recorded accounts payable or accounts receivable to reflect the rough production cost equalization payments and receipts required to implement the FERC’s remedy.  When accounts payable were recorded, a corresponding regulatory asset was recorded for the right to collect the payments from customers. When accounts receivable were recorded, a corresponding regulatory liability was recorded for the obligations to pass the receipts on to customers.  No payments were required in 2016 or 2015 to implement the FERC’s remedy based on calendar year 2015 production costs and 2014 production costs, respectively. The System Agreement terminated in August 2016.

The APSC approved a production cost allocation rider for recovery from customers of the retail portion of the costs allocated to Entergy Arkansas.  Entergy Texas recovered its 2013 rough production cost equalization payment over three years beginning April 2014. Entergy Texas included its 2014 rough production cost equalization payment as a component of an interim fuel refund made in 2014. Management believes that any changes in the allocation of production costs resulting from the FERC’s decision and related retail proceedings should result in similar rate changes for retail customers, subject to specific circumstances that have caused trapped costs.

The following rough production cost equalization rate proceedings are still ongoing.

2010 Rate Filing Based on Calendar Year 2009 Production Costs

In May 2010, Entergy filed with the FERC the 2010 rates in accordance with the FERC’s orders in the System Agreement proceeding, and supplemented the filing in September 2010.  Several parties intervened in the proceeding at the FERC, including the LPSC and the City Council, which also filed protests.  In July 2010 the FERC accepted Entergy’s proposed rates for filing, effective June 1, 2010, subject to refund.  After an abeyance of the proceeding schedule, a hearing was held in March 2014 and in December 2015 the FERC issued an order. Among other things, the December 2015 order directed Entergy to submit a compliance filing. In January 2016 the LPSC, the APSC, and Entergy filed requests for rehearing of the FERC’s December 2015 order. In February 2016, Entergy submitted the compliance filing ordered in the December 2015 order.  The result of the true-up payments and receipts for the recalculation of production costs resulted in the following payments/receipts among the Utility operating companies:
 
Payments (Receipts)
 
(In Millions)
Entergy Arkansas
$2
Entergy Louisiana
$6
Entergy Mississippi
($4)
Entergy New Orleans
($1)
Entergy Texas
($3)

 
In September 2016 the FERC accepted the February 2016 compliance filing subject to a further compliance filing made in November 2016. The further compliance filing was required as a result of an order issued in September 2016 ruling on the January 2016 rehearing requests filed by the LPSC, the APSC, and Entergy. In the order addressing the rehearing requests, the FERC granted the LPSC’s rehearing request and directed that interest be calculated on the payment/receipt amounts. The FERC also granted the APSC’s and Entergy’s rehearing request and ordered the removal of both securitized asset accumulated deferred income taxes and contra-securitization accumulated deferred income taxes from the calculation. In November 2016, Entergy submitted its compliance filing in response to the FERC’s order on rehearing. The compliance filing included a revised refund calculation of the true-up payments and receipts based on 2009 test year data and interest calculations. The LPSC protested the interest calculations. In November 2017 the FERC issued an order rejecting the November 2016 compliance filing. The FERC determined that the payments detailed in the November 2016 compliance filing did not include adequate interest for the payments from Entergy Arkansas to Entergy Louisiana because it did not include interest on the principal portion of the payment that was made in February 2016. In December 2017, Entergy recalculated the interest pursuant to the November 2017 order. As a result of the recalculations, Entergy Arkansas owed very minor payments to Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans.

2011 Rate Filing Based on Calendar Year 2010 Production Costs

In May 2011, Entergy filed with the FERC the 2011 rates in accordance with the FERC’s orders in the System Agreement proceeding.  Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest.  In July 2011 the FERC accepted Entergy’s proposed rates for filing, effective June 1, 2011, subject to refund. After an abeyance of the proceeding schedule, in December 2014 the FERC consolidated the 2011 rate filing with the 2012, 2013, and 2014 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

2012 Rate Filing Based on Calendar Year 2011 Production Costs

In May 2012, Entergy filed with the FERC the 2012 rates in accordance with the FERC’s orders in the System Agreement proceeding.  Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest.  In August 2012 the FERC accepted Entergy’s proposed rates for filing, effective June 2012, subject to refund. After an abeyance of the proceeding schedule, in December 2014 the FERC consolidated the 2012 rate filing with the 2011, 2013, and 2014 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

2013 Rate Filing Based on Calendar Year 2012 Production Costs

In May 2013, Entergy filed with the FERC the 2013 rates in accordance with the FERC’s orders in the System Agreement proceeding. Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest. The City Council intervened and filed comments related to including the outcome of a related FERC proceeding in the 2013 cost equalization calculation. In August 2013 the FERC issued an order accepting the 2013 rates, effective June 1, 2013, subject to refund. After an abeyance of the proceeding schedule, in December 2014 the FERC consolidated the 2013 rate filing with the 2011, 2012, and 2014 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

2014 Rate Filing Based on Calendar Year 2013 Production Costs

In May 2014, Entergy filed with the FERC the 2014 rates in accordance with the FERC’s orders in the System Agreement proceeding. Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest. The City Council intervened and filed comments. In December 2014 the FERC issued an order accepting the 2014 rates, effective June 1, 2014, subject to refund, set the proceeding for hearing procedures, and consolidated the 2014 rate filing with the 2011, 2012, and 2013 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

Consolidated 2011, 2012, 2013, and 2014 Rate Filing Proceedings

As discussed above, in December 2014 the FERC consolidated the 2011, 2012, 2013, and 2014 rate filings for settlement and hearing procedures. In May 2015, Entergy filed direct testimony in the consolidated rate filings and the LPSC filed direct testimony concerning its complaint proceeding that is consolidated with the rate filings, challenging certain components of the pending bandwidth calculations for prior years. Hearings occurred in November 2015, and the ALJ issued an initial decision in July 2016. In the initial decision, the ALJ generally agreed with Entergy’s bandwidth calculations with one exception on the accounting related to the Waterford 3 sale/leaseback. Briefs were filed in September 2016 and the proceeding is pending.

Utility Operating Company Termination of System Agreement Participation

Entergy Arkansas and Entergy Mississippi ceased participating in the System Agreement effective December 18, 2013 and November 7, 2015, respectively. Entergy Louisiana, Entergy New Orleans, and Entergy Texas terminated participation in the System Agreement on August 31, 2016, which resulted in the termination of the System Agreement in its entirety pursuant to a settlement agreement approved by the FERC in December 2015.

In December 2013 the FERC set one issue for hearing involving whether and how the benefits associated with settlement with Union Pacific regarding certain coal delivery issues should be allocated among Entergy Arkansas and the other Utility operating companies post-termination of the System Agreement. In December 2014 a FERC ALJ issued an initial decision finding that Entergy Arkansas would realize benefits after December 18, 2013 from the 2008 settlement agreement between Entergy Services, Entergy Arkansas, and Union Pacific, related to certain coal delivery issues. The ALJ further found that all of the Utility operating companies should share in those benefits pursuant to a methodology proposed by the MPSC. The Utility operating companies and other parties to the proceeding filed briefs on exceptions and/or briefs opposing exceptions with the FERC challenging various aspects of the December 2014 initial decision. In March 2016 the FERC issued an opinion affirming the December 2014 initial decision with regard to the determination that there were benefits related to the Union Pacific settlement, which were realized post-Entergy Arkansas’s December 2013 withdrawal from the System Agreement, that should be shared with the other Utility operating companies utilizing the methodology proposed by the MPSC and trued-up to actual coal volumes purchased. In May 2016, Entergy made a compliance filing that provided the calculation of Union Pacific settlement benefits utilizing the methodology adopted by the initial decision, trued-up for the actual volumes of coal purchased. The payments were made in May 2016. In August 2016 the FERC issued an order accepting Entergy’s compliance filing. Also in August 2016 the APSC filed a petition for review of the FERC’s March 2016 and August 2016 orders with the U.S. Court of Appeals for the D.C. Circuit. Oral argument before the D.C. Circuit was held on the APSC’s petition in January 2018 and a decision is pending.

In connection with the System Agreement termination settlement agreement, the purchase power agreements, referred to as the jurisdictional separation plan PPAs, between Entergy Texas and Entergy Gulf States Louisiana that were put in place for certain legacy gas units at the time of Entergy Gulf States’s separation into Entergy Texas and Entergy Gulf States Louisiana terminated effective with the System Agreement termination. Similarly, the purchase power agreement between Entergy Gulf States Louisiana and Entergy Texas for the Calcasieu unit also terminated. In March 2016, Entergy Services filed with the FERC the notices of termination. The jurisdictional separation plan PPAs were the means by which Entergy Texas received payment for its receivable associated with Entergy Louisiana’s Spindletop gas storage facility regulatory asset. As a result of the System Agreement termination settlement agreement, effective with the termination date, Entergy Texas no longer receives payments from Entergy Louisiana related to the Spindletop storage facility, which resulted in a write-off recorded in 2015 by Entergy Texas of $23.5 million ($15.3 million net-of-tax). Upon termination of the System Agreement, other purchase power agreements entered into under Service Schedule MSS-4 of the System Agreement were replaced with updated agreements under a FERC-jurisdictional tariff effective September 1, 2016.

Interruptible Load Proceeding

In April 2007 the U.S. Court of Appeals for the D.C. Circuit issued its opinion in the LPSC’s appeal of the FERC’s March 2004 and April 2005 orders related to the treatment under the System Agreement of the Utility operating companies’ interruptible loads.  In its opinion the D.C. Circuit concluded that the FERC: (1) acted arbitrarily and capriciously by allowing the Utility operating companies to phase-in the effects of the elimination of the interruptible load over a 12-month period of time; (2) failed to adequately explain why refunds could not be ordered under Section 206(c) of the Federal Power Act; and (3) exercised appropriately its discretion to defer addressing the cost of sulfur dioxide allowances until a later time.  The D.C. Circuit remanded the matter to the FERC for a more considered determination on the issue of refunds.  The FERC issued its order on remand in September 2007, in which it directed Entergy to make a compliance filing removing all interruptible load from the computation of peak load responsibility commencing April 1, 2004 and to issue any necessary refunds to reflect this change.  In addition, the order directed the Utility operating companies to make refunds for the period May 1995 through July 1996.  In November 2007 the Utility operating companies filed a refund report describing the refunds to be issued pursuant to the FERC’s orders.  The LPSC filed a protest to the refund report in December 2007, and the Utility operating companies filed an answer to the protest in January 2008.  The refunds were made in October 2008 by the Utility operating companies that owed refunds to the Utility operating companies that were due refunds under the decision.  The APSC and the Utility operating companies appealed the FERC decisions to the D.C. Circuit.

Following the filing of petitioners’ initial briefs, the FERC filed a motion requesting the D.C. Circuit hold the appeal of the FERC’s decisions ordering refunds in the interruptible load proceeding in abeyance and remand the record to the FERC.  The D.C. Circuit granted the FERC’s unopposed motion in June 2009.  In December 2009 the FERC established a paper hearing to determine whether the FERC had the authority and, if so, whether it would be appropriate to order refunds resulting from changes in the treatment of interruptible load in the allocation of capacity costs by the Utility operating companies.  In August 2010 the FERC issued an order stating that it has the authority and refunds are appropriate.  The APSC, the MPSC, and Entergy requested rehearing of the FERC’s decision.  In June 2011 the FERC issued an order granting rehearing in part and denying rehearing in part, in which the FERC determined to invoke its discretion to deny refunds.  The FERC held that in this case where “the Entergy system as a whole collected the proper level of revenue, but, as was later established, incorrectly allocated peak load responsibility among the various Entergy operating companies….the Commission will apply here our usual practice in such cases, invoking our equitable discretion to not order refunds, notwithstanding our authority to do so.”  The LPSC has requested rehearing of the FERC’s June 2011 decision.  In July 2011 the refunds made in the fourth quarter 2009 described above were reversed. In October 2011 the FERC issued an “Order Establishing Paper Hearing” inviting parties that oppose refunds to file briefs within 30 days addressing the LPSC’s argument that FERC precedent supports refunds under the circumstances present in this proceeding.  Parties that favor refunds were then invited to file reply briefs within 21 days of the date that the initial briefs were due.  

In September 2010 the FERC had issued an order setting the refund report filed in the proceeding in November 2007 for hearing and settlement judge procedures.  In May 2011, Entergy filed a settlement agreement that resolved all issues relating to the refund report set for hearing.  In June 2011 the settlement judge certified the settlement as uncontested.  The settlement agreement was approved by the FERC in September 2016.

Prior to the FERC’s June 2011 order on rehearing, Entergy Arkansas filed an application in November 2010 with the APSC for recovery of the refund that it paid.  The APSC denied Entergy Arkansas’s application, and also denied Entergy Arkansas’s petition for rehearing.  If the FERC were to order Entergy Arkansas to pay refunds on rehearing in the interruptible load proceeding the APSC’s decision would trap FERC-approved costs at Entergy Arkansas with no regulatory-approved mechanism to recover them.  In August 2011, Entergy Arkansas filed a complaint in the United States District Court for the Eastern District of Arkansas asking for a declaratory judgment that the rejection of Entergy Arkansas’s application by the APSC is preempted by the Federal Power Act.  The APSC filed a motion to dismiss the complaint.  In April 2012 the United States district court dismissed Entergy Arkansas’s complaint without prejudice stating that Entergy Arkansas’s claim is not ripe for adjudication and that Entergy Arkansas did not have standing to bring suit at this time.

In March 2013 the FERC issued an order denying the LPSC’s request for rehearing of the FERC’s June 2011 order wherein the FERC concluded it would exercise its discretion and not order refunds in the interruptible load proceeding. Based on its review of the LPSC’s request for rehearing and the briefs filed as part of the paper hearing established in October 2011, the FERC affirmed its earlier ruling and declined to order refunds under the circumstances of the case. In May 2013 the LPSC filed a petition for review with the U.S. Court of Appeals for the D.C. Circuit seeking review of FERC prior orders in the interruptible load proceeding that concluded that the FERC would exercise its discretion and not order refunds in the proceeding. Oral argument was held on the appeal in the D.C. Circuit in September 2014. In December 2014 the D.C. Circuit issued an order on the LPSC’s appeal and remanded the case back to the FERC. The D.C. Circuit rejected the LPSC’s argument that there is a presumption in favor of refunds, but it held that the FERC had not adequately explained its decision to deny refunds and directed the FERC “to consider the relevant factors and weigh them against one another.” In March 2015, Entergy filed with the FERC a motion to establish a briefing schedule on remand and an initial brief on remand to address the December 2014 decision by the D.C. Circuit. The initial brief on remand argued that the FERC, in response to the D.C. Circuit decision, should clarify its policy on refunds and find that refunds are not required in the interruptible load proceeding.

In April 2016 the FERC issued an order on remand that addressed the December 2014 decision by the D.C. Circuit in the interruptible load proceeding. The order on remand affirmed the FERC’s denial of refunds for the 15-month refund effective period. The FERC explained and clarified its policies regarding refunds and concluded that the evidence in the record demonstrated that the relevant equitable factors favored not requiring refunds in this case. The FERC also noted that, under Section 206(c) of the Federal Power Act, in a Section 206 proceeding involving two or more electric utility companies of a registered holding company system, the FERC may order refunds only if it determines the refunds would not cause the registered holding company to experience any reduction in revenues resulting from an inability of an electric utility company in the system to recover the resulting increase in costs. The FERC stated it was not able to find that the Entergy system would not experience a reduction in revenues if refunds were awarded in this proceeding, which further supported the denial of refunds. In May 2016 the LPSC filed a request for rehearing of the FERC’s April 2016 order. In September 2016 the FERC issued an order denying the LPSC’s request for rehearing and reaffirming its denial of refunds for the 15-month refund effective period. The LPSC has appealed the April and September 2016 orders to the U.S. Court of Appeals for the D.C. Circuit. Oral argument before the D.C. Circuit was held before the D.C. Circuit in February 2018 and a decision is pending.
 
Entergy Arkansas Opportunity Sales Proceeding

In June 2009 the LPSC filed a complaint requesting that the FERC determine that certain of Entergy Arkansas’s sales of electric energy to third parties: (a) violated the provisions of the System Agreement that allocated the energy generated by Entergy System resources; (b) imprudently denied the Entergy System and its ultimate consumers the benefits of low-cost Entergy System generating capacity; and (c) violated the provision of the System Agreement that prohibited sales to third parties by individual companies absent an offer of a right-of-first-refusal to other Utility operating companies.   The LPSC’s complaint challenged sales made beginning in 2002 and requested refunds.  In July 2009 the Utility operating companies filed a response to the complaint requesting that the FERC dismiss the complaint on the merits without hearing because the LPSC has failed to meet its burden of showing any violation of the System Agreement and failed to produce any evidence of imprudent action by the Entergy System.  In their response, the Utility operating companies explained that the System Agreement clearly contemplates that the Utility operating companies may make sales to third parties for their own account, subject to the requirement that those sales be included in the load (or load shape) for the applicable Utility operating company.  The FERC subsequently ordered a hearing in the proceeding.

The LPSC filed direct testimony in the proceeding alleging, among other things, (1) that Entergy violated the System Agreement by permitting Entergy Arkansas to make non-requirements sales to non-affiliated third parties rather than making such energy available to the other Utility operating companies’ customers; and (2) that over the period 2000 - 2009, these non-requirements sales caused harm to the Utility operating companies’ customers and these customers should be compensated for this harm by Entergy.  In subsequent testimony, the LPSC modified its original damages claim in favor of quantifying damages by re-running intra-system bills.  The Utility operating companies believe the LPSC’s allegations are without merit.  A hearing in the matter was held in August 2010.

In December 2010 the ALJ issued an initial decision.  The ALJ found that the System Agreement allowed for Entergy Arkansas to make the sales to third parties but concluded that the sales should be accounted for in the same manner as joint account sales.  The ALJ concluded that “shareholders” should make refunds of the damages to the Utility operating companies, along with interest.  Entergy disagreed with several aspects of the ALJ’s initial decision and in January 2011 filed with the FERC exceptions to the decision.

The FERC issued a decision in June 2012 and held that, while the System Agreement is ambiguous, it does provide authority for individual Utility operating companies to make opportunity sales for their own account and Entergy Arkansas made and priced these sales in good faith.  The FERC found, however, that the System Agreement does not provide authority for an individual Utility operating company to allocate the energy associated with such opportunity sales as part of its load, but provides a different allocation authority.  The FERC further found that the after-the-fact accounting methodology used to allocate the energy used to supply the sales was inconsistent with the System Agreement.  Quantifying the effect of the FERC’s decision requires re-running intra-system bills for a ten-year period, and the FERC in its decision established further hearing procedures to determine the calculation of the effects.  In July 2012, Entergy and the LPSC filed requests for rehearing of the FERC’s June 2012 decision. A hearing was held in May 2013 to quantify the effect of repricing the opportunity sales in accordance with the FERC’s June 2012 decision.

In August 2013 the presiding judge issued an initial decision in the calculation proceeding. The initial decision concluded that the methodology proposed by the LPSC, rather than the methodologies proposed by Entergy or the FERC Staff, should be used to calculate the payments that Entergy Arkansas is to make to the other Utility operating companies. The initial decision also concluded that the other System Agreement service schedules should not be adjusted and that payments by Entergy Arkansas should not be reflected in the rough production cost equalization bandwidth calculations for the applicable years. The initial decision recognized that the LPSC’s methodology would result in an inequitable windfall to the other Utility operating companies and, therefore, concluded that any payments by Entergy Arkansas should be reduced by 20%. The LPSC, the APSC, the City Council, and FERC staff filed briefs on exceptions and/or briefs opposing exceptions. Entergy filed a brief on exceptions requesting that the FERC reverse the initial decision and a brief opposing certain exceptions taken by the LPSC and FERC staff.

In April 2016 the FERC issued orders addressing requests for rehearing filed in July 2012 and the ALJ’s August 2013 initial decision. The first order denied Entergy’s request for rehearing and affirmed the FERC’s earlier rulings that Entergy’s original methodology for allocating energy costs to the opportunity sales was incorrect and, as a result, Entergy Arkansas must make payments to the other Utility operating companies to put them in the same position that they would have been in absent the incorrect allocation. The FERC clarified that interest should be included with the payments. The second order affirmed in part, and reversed in part, the rulings in the ALJ’s August 2013 initial decision regarding the methodology that should be used to calculate the payments Entergy Arkansas is to make to the other Utility operating companies. The FERC affirmed the ALJ’s ruling that a full re-run of intra-system bills should be performed, but required that methodology be modified so that the sales have the same priority for purposes of energy allocation as joint account sales. The FERC reversed the ALJ’s decision that any payments by Entergy Arkansas should be reduced by 20%. The FERC also reversed the ALJ’s decision that adjustments to other System Agreement service schedules and excess bandwidth payments should not be taken into account when calculating the payments to be made by Entergy Arkansas. The FERC held that such adjustments and excess bandwidth payments should be taken into account, but ordered further proceedings before an ALJ to address whether a cap on any reduction due to bandwidth payments was necessary and to implement the other adjustments to the calculation methodology.

In May 2016, Entergy Services filed a request for rehearing of the FERC’s April 2016 order arguing that payments made by Entergy Arkansas should be reduced as a result of the timing of the LPSC’s approval of certain contracts. Entergy Services also filed a request for clarification and/or rehearing of the FERC’s April 2016 order addressing the ALJ’s August 2013 initial decision. The APSC and the LPSC also filed requests for rehearing of the FERC’s April 2016 order. In September 2017 the FERC issued an order denying the request for rehearing on the issue of whether any payments by Entergy Arkansas to the other Utility operating companies should be reduced due to the timing of the LPSC’s approval of Entergy Arkansas’s wholesale baseload contract with Entergy Louisiana. In November 2017 the FERC issued an order denying all of the remaining requests for rehearing of the April 2016 order. In November 2017, Entergy Services filed a petition for review in the D.C. Circuit of the FERC’s orders in the first two phases of the opportunity sales case. In December 2017 the D.C. Circuit granted Entergy Services’s request to hold the appeal in abeyance pending final resolution of the related proceeding still pending with the FERC. In January 2018 the APSC and the LPSC filed separate petitions for review in the D.C. Circuit, and the D.C. Circuit consolidated the appeals with Entergy Services’s appeal and held all of the appeals in abeyance.

Pursuant to the procedural schedule established in the case, Entergy Services re-ran intra-system bills for the ten-year period 2000-2009 to quantify the effects of the FERC's ruling. In November 2016 the LPSC submitted testimony disputing certain aspects of the calculations. A hearing was held in May 2017. In July 2017, the ALJ issued an initial decision concluding that Entergy Arkansas should pay $86 million plus interest to the other Utility operating companies. In August 2017 the Utility operating companies, the LPSC, the APSC, and FERC staff filed individual briefs on exceptions challenging various aspects of the initial decision. In September 2017 the Utility operating companies, the LPSC, the APSC, the MPSC, the City Council, and FERC staff filed separate briefs opposing exceptions taken by various parties. The case is pending before the FERC. No payments will be made or received by the Utility operating companies until the FERC issues an order reviewing the initial decision and Entergy submits a subsequent filing to comply with that order.

The effect of the FERC’s decisions thus far in the case would be that Entergy Arkansas will make payments to some or all of the other Utility operating companies. Because further proceedings will still occur in the case, the amount and recipients of payments by Entergy Arkansas are unknown at this time. Based on testimony previously submitted in the case and its assessment of the April 2016 FERC orders, in the first quarter 2016, Entergy Arkansas recorded a liability of $87 million, which includes interest, for its estimated increased costs and payment to the other Utility operating companies. This estimate is subject to change depending on how the FERC resolves the issues that are still outstanding in the case, including its review of the July 2017 initial decision. Entergy Arkansas’s increased costs will be attributed to Entergy Arkansas’s retail and wholesale businesses, and it is not probable that Entergy Arkansas will recover the wholesale portion. Entergy Arkansas, therefore, recorded a deferred fuel regulatory asset in the first quarter 2016 of approximately $75 million, which represents its estimate of the retail portion of the costs. Following its assessment of the course of the proceedings, including the FERC’s denial of rehearing in November 2017 described above, in the fourth quarter 2017, Entergy Arkansas recorded an additional liability of $35 million and a regulatory asset of $31 million. Because management currently expects to recover the retail portion of the costs through a base rate proceeding or newly proposed rider, the regulatory asset is reflected as Other regulatory assets as of December 31, 2017.
    
Complaint Against System Energy

In January 2017 the APSC and MPSC filed a complaint with the FERC against System Energy. The complaint seeks a reduction in the return on equity component of the Unit Power Sales Agreement pursuant to which System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. Entergy Arkansas also sells some of its Grand Gulf capacity and energy to Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under separate agreements. The current return on equity under the Unit Power Sales Agreement is 10.94%. The complaint alleges that the return on equity is unjust and unreasonable because current capital market and other considerations indicate that it is excessive. The complaint requests the FERC to institute proceedings to investigate the return on equity and establish a lower return on equity, and also requests that the FERC establish January 23, 2017 as a refund effective date. The complaint includes return on equity analysis that purports to establish that the range of reasonable return on equity for System Energy is between 8.37% and 8.67%. System Energy answered the complaint in February 2017 and disputes that a return on equity of 8.37% to 8.67% is just and reasonable. The LPSC and the City Council intervened in the proceeding expressing support for the complaint. System Energy is recording a provision against revenue for the potential outcome of this proceeding. In September 2017 the FERC established a refund effective date of January 23, 2017, consolidated the return on equity complaint with the proceeding described in Unit Power Sales Agreement below, and directed the parties to engage in settlement proceedings before an ALJ. If the parties fail to come to an agreement during settlement proceedings, a prehearing conference will be held to establish a procedural schedule for hearing proceedings.

Unit Power Sales Agreement

In August 2017, System Energy submitted to the FERC proposed amendments to the Unit Power Sales Agreement pursuant to which System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. The filing proposes limited amendments to the Unit Power Sales Agreement to adopt (1) updated rates for use in calculating Grand Gulf plant depreciation and amortization expenses and (2) updated nuclear decommissioning cost annual revenue requirements, both of which are recovered through the Unit Power Sales Agreement rate formula. The proposed amendments would result in lower charges to the Utility operating companies that buy capacity and energy from System Energy under the Unit Power Sales Agreement. The proposed changes are based on updated depreciation and nuclear decommissioning studies that take into account the renewal of Grand Gulf’s operating license for a term through November 1, 2044. System Energy requested that the FERC accept the amendments effective October 1, 2017.

In September 2017 the FERC accepted System Energy’s proposed Unit Power Sales Agreement amendments, subject to further proceedings to consider the justness and reasonableness of the amendments. Because the amendments propose a rate decrease, the FERC also initiated an investigation under Section 206 of the Federal Power Act to determine if the rate decrease should be lower than proposed. The FERC accepted the proposed amendments effective October 1, 2017, subject to refund pending the outcome of the further settlement and/or hearing proceedings, and established a refund effective date of October 11, 2017 with respect to the rate decrease. The FERC also consolidated the Unit Power Sales Agreement amendment proceeding with the proceeding described in Complaint Against System Energy above, and directed the parties to engage in settlement proceedings before an ALJ. If the parties fail to come to an agreement during settlement proceedings, a prehearing conference will be held to establish a procedural schedule for hearing proceedings.

Storm Cost Recovery Filings with Retail Regulators

Entergy Louisiana

Hurricane Isaac

In August 2012, Hurricane Isaac caused extensive damage to Entergy Louisiana’s service area.  The storm resulted in widespread power outages, significant damage primarily to distribution infrastructure, and the loss of sales during the power outages.  In June 2014 the LPSC authorized Entergy Louisiana to utilize Louisiana Act 55 financing for Hurricane Isaac system restoration costs.  Entergy Louisiana committed to pass on to customers a minimum of $30.8 million of customer benefits through annual customer credits of approximately $6.2 million for five years. Approvals for the Act 55 financings were obtained from the Louisiana Utilities Restoration Corporation (LURC) and the Louisiana State Bond Commission.

In August 2014 the Louisiana Local Government Environmental Facilities and Community Development Authority (LCDA) issued $314.85 million in bonds under Louisiana Act 55.  From the $309 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $16 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $293 million directly to Entergy Louisiana.  Entergy Louisiana used the $293 million received from the LURC to acquire 2,935,152.69 Class C preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 7.5% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2014, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement. The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1.75 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC, and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

Hurricane Gustav and Hurricane Ike

In September 2008, Hurricane Gustav and Hurricane Ike caused catastrophic damage to Entergy Louisiana’s service territory.  In December 2009, Entergy Louisiana entered into a stipulation agreement with the LPSC staff regarding its storm costs.  In March and April 2010, Entergy Louisiana and other parties to the proceeding filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal to utilize Act 55 financing, which included a commitment to pass on to customers a minimum of $43.3 million of customer benefits through a prospective annual rate reduction of $8.7 million for five years.  In April 2010 the LPSC approved the settlement and subsequently issued financing orders and a ratemaking order intended to facilitate the implementation of the Act 55 financings.  In June 2010 the Louisiana State Bond Commission approved the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricane Gustav and Hurricane Ike was reduced by $2.7 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2010, the LCDA issued two series of bonds totaling $713.0 million under Act 55.  From the $702.7 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $290 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $412.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana used $412.7 million to acquire 4,126,940.15 Class B preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 9% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2010, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA, and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC, and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.
Hurricane Katrina and Hurricane Rita

In August and September 2005, Hurricanes Katrina and Rita caused catastrophic damage to Entergy Louisiana’s service territory. In March 2008, Entergy Louisiana and the LURC filed at the LPSC an application requesting that the LPSC grant a financing order authorizing the financing of Entergy Louisiana storm costs, storm reserves, and issuance costs pursuant to Louisiana Act 55.  The Louisiana Act 55 financing is expected to produce additional customer benefits as compared to traditional securitization.  Entergy Louisiana also filed an application requesting LPSC approval for ancillary issues including the mechanism to flow charges and savings to customers via a storm cost offset rider.  In April 2008 the Louisiana Public Facilities Authority (LPFA), which is the issuer of the bonds pursuant to the Act 55 financing, approved requests for the Act 55 financing.  Also in April 2008, Entergy Louisiana and the LPSC staff filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal under the Act 55 financing, which included a commitment to pass on to customers a minimum of $40 million of customer benefits through a prospective annual rate reduction of $8 million for five years.  The LPSC subsequently approved the settlement and issued two financing orders and one ratemaking order intended to facilitate implementation of the Act 55 financing.  In May 2008 the Louisiana State Bond Commission granted final approval of the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricanes Katrina and Rita was reduced by $22.3 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2008 the LPFA issued $687.7 million in bonds under the aforementioned Act 55.  From the $679 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $152 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $527 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $545 million, including $17.8 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 5,449,861.85 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 10% annual distribution rate.  In August 2008, the LPFA issued $278.4 million in bonds under the aforementioned Act 55.  From the $274.7 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $87 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $187.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $189.4 million, including $1.7 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 1,893,918.39 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC that carry a 10% annual distribution rate.  Distributions are payable quarterly commencing on September 15, 2008 and have a liquidation price of $100 per unit.  The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.  In February 2012, Entergy Louisiana sold 500,000 of its Class A preferred membership units in Entergy Holdings Company LLC, a wholly-owned Entergy subsidiary, to a third party in exchange for $51 million plus accrued but unpaid distributions on the units.  The 500,000 preferred membership units are mandatorily redeemable in January 2112.

Entergy and Entergy Louisiana do not report the bonds issued by the LPFA on their balance sheets because the bonds are the obligation of the LPFA, and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC, and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

Entergy Mississippi

Entergy Mississippi has approval from the MPSC to collect a storm damage provision of $1.75 million per month. If Entergy Mississippi’s accumulated storm damage provision balance exceeds $15 million, the collection of the storm damage provision ceases until such time that the accumulated storm damage provision becomes less than $10 million. As of April 30, 2016, Entergy Mississippi’s storm damage provision balance was less than $10 million, therefore Entergy Mississippi resumed billing the monthly storm damage provision effective with June 2016 bills. As of September 30, 2016, however, Entergy Mississippi’s storm damage provision balance again exceeded $15 million. Accordingly the storm damage provision was reset to zero beginning with November 2016 bills. As of July 31, 2017, the balance in Entergy Mississippi’s accumulated storm damage provision was again less than $10 million, therefore Entergy Mississippi resumed billing the monthly storm damage provision effective with September 2017 bills.

Entergy New Orleans

In August 2012, Hurricane Isaac caused extensive damage to Entergy New Orleans’s service area. In January 2015 the City Council issued a resolution approving the terms of a joint agreement in principle filed by Entergy New Orleans, Entergy Louisiana, and the City Council Advisors determining, among other things, that Entergy New Orleans’s prudently-incurred storm recovery costs were $49.3 million, of which $31.7 million, net of reimbursements from the storm reserve escrow account, remained recoverable from Entergy New Orleans’s electric customers. The resolution also directed Entergy New Orleans to file an application to securitize the unrecovered City Council-approved storm recovery costs of $31.7 million pursuant to the Louisiana Electric Utility Storm Recovery Securitization Act (Louisiana Act 64). In addition, the resolution found that it was reasonable for Entergy New Orleans to include in the principal amount of its potential securitization the costs to fund and replenish Entergy New Orleans’s storm reserve in an amount that achieved the City Council-approved funding level of $75 million. In January 2015, in compliance with that directive, Entergy New Orleans filed with the City Council an application requesting that the City Council grant a financing order authorizing the financing of Entergy New Orleans’s storm costs, storm reserves, and issuance costs pursuant to Louisiana Act 64. In May 2015 the parties entered into an agreement in principle and the City Council issued a financing order authorizing Entergy New Orleans to issue storm recovery bonds in the aggregate amount of $98.7 million, including $31.8 million for recovery of Entergy New Orleans’s Hurricane Isaac storm recovery costs, including carrying costs, $63.9 million to fund and replenish Entergy New Orleans’s storm reserve, and approximately $3 million for estimated up-front financing costs associated with the securitization. See Note 5 to the financial statements for discussion of the issuance of the securitization bonds in July 2015.

New Nuclear Generation Development Costs

Entergy Louisiana

Entergy Louisiana and Entergy Gulf States Louisiana were developing a project option for new nuclear generation at River Bend.  In March 2010, Entergy Louisiana and Entergy Gulf States Louisiana filed with the LPSC seeking approval to continue the limited development activities necessary to preserve an option to construct a new unit at River Bend.  At its June 2012 meeting the LPSC voted to uphold an ALJ recommendation that the request of Entergy Louisiana and Entergy Gulf States Louisiana be declined on the basis that the LPSC’s rule on new nuclear development does not apply to activities to preserve an option to develop and on the further grounds that the companies improperly engaged in advanced preparation activities prior to certification.  The LPSC directed that Entergy Louisiana and Entergy Gulf States Louisiana be permitted to seek recovery of these costs in their upcoming rate case filings that were subsequently filed in February 2013. In the resolution of the rate case proceeding the LPSC provided for an eight-year amortization of costs incurred in connection with the potential development of new nuclear generation at River Bend, without carrying costs, beginning in December 2014, provided, however, that amortization of these costs shall not result in a future rate increase. As of December 31, 2017, Entergy Louisiana has a regulatory asset of $35.8 million on its balance sheet related to these new nuclear generation development costs.
Entergy Louisiana [Member]  
Rate And Regulatory Matters
RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)
 
Regulatory Assets and Regulatory Liabilities

Regulatory assets represent probable future revenues associated with costs that Entergy expects to recover from customers through the regulatory ratemaking process under which the Utility business operates. Regulatory liabilities represent probable future reductions in revenues associated with amounts that Entergy expects to benefit customers through the regulatory ratemaking process under which the Utility business operates. In addition to the regulatory assets and liabilities that are specifically disclosed on the face of the balance sheets, the tables below provide detail of “Other regulatory assets” and “Other regulatory liabilities” that are included on Entergy’s and the Registrant Subsidiaries’ balance sheets as of December 31, 2017 and 2016:
 
Other Regulatory Assets

Entergy
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$2,642.3

 

$2,635.5

Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
746.0

 
677.2

Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 2 – Storm Cost Recovery Filings with Retail Regulators) (Note 5)
558.9

 
637.0

Removal costs - recovered through depreciation rates (Note 9) (a)
436.5

 
353.9

Opportunity Sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding)
109.8

 

Retail rate deferrals - recovered through rate riders as rates are redetermined by retail regulators
86.4

 
22.1

Unamortized loss on reacquired debt - recovered over term of debt
82.9

 
91.4

Little Gypsy costs – recovered through securitization (Note 5 – Entergy Louisiana Securitization Bonds - Little Gypsy)
73.7

 
100.0

Transition to competition costs - recovered over a 15-year period through February 2021
37.7

 
47.9

New nuclear generation development costs (Note 2 - New Nuclear Generation Development Costs) (b)
36.4

 
43.7

Other
125.1

 
161.2

Entergy Total

$4,935.7

 

$4,769.9



Entergy Arkansas
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$757.0

 

$786.6

Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
345.2

 
322.9

Removal costs - recovered through depreciation rates (Note 9) (a)
176.9

 
128.5

Opportunity sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding)
109.8

 

Storm damage costs - recovered either through securitization or retail rates (Note 5 - Entergy Arkansas Securitization Bonds)
76.2

 
88.9

Retail rate deferrals - recovered through rate riders as rates are redetermined annually
28.2

 
10.1

Unamortized loss on reacquired debt - recovered over term of debt
24.3

 
27.6

ANO Fukushima and Flood Barrier costs - recovered through retail rates through February 2026 (Note 2 - Retail Rate Proceedings) (b)
14.4

 
16.1

Lake Catherine 4 reliability and sustainability cost deferral - recovery through retail rates (b)
8.9

 
9.8

Incremental ice storm costs - recovered through 2032
7.4

 
7.9

MISO costs - recovery through retail rates through 2018 (Note 2 - Retail Rate Proceedings) (b)
5.5

 
11.1

Human capital management costs - recovery through retail rates through August 2019 (Note 2 - Retail Rate Proceedings) (b)
4.4

 
7.0

Other
9.2

 
11.5

Entergy Arkansas Total

$1,567.4

 

$1,428.0



Entergy Louisiana
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans and Non-Qualified Pension Plans) (a)

$724.6

 

$715.7

Asset Retirement Obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
218.6

 
199.4

Little Gypsy costs – recovered through securitization (Note 5 – Entergy Louisiana Securitization Bonds - Little Gypsy)
71.4

 
97.8

New nuclear generation development costs - recovery through formula rate plan beginning December 2014 through November 2022 (Note 2 - New Nuclear Generation Development Costs) (b)
35.8

 
43.1

Unamortized loss on reacquired debt - recovered over term of debt
24.7

 
27.0

Storm damage costs - recovered through retail rates (Note 2 - Storm Cost Recovery Filings with Retail Regulators)
14.3

 

Business combination external costs deferral - recovery through formula rate plan beginning December 2015 through November 2025 (b)
14.1

 
15.2

River Bend AFUDC - recovered through August 2025 (Note 1 – River Bend AFUDC)
12.9

 
14.8

Other
29.4

 
55.1

Entergy Louisiana Total

$1,145.8

 

$1,168.1



Entergy Mississippi
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$218.7

 

$217.2

Removal costs - recovered through depreciation rates (Note 9) (a)
91.6

 
82.0

Retail rate deferrals - recovered through rate riders as rates are redetermined annually
49.4

 
9.3

Unamortized loss on reacquired debt - recovered over term of debt
17.6

 
18.9

Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
7.6

 
7.2

Other
13.0

 
7.6

Entergy Mississippi Total

$397.9

 

$342.2



Entergy New Orleans
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$102.8

 

$108.8

Storm damage costs, including hurricane costs - recovered through retail rates and securitization (Note 2 - Storm Cost Recovery Filings with Retail Regulators)
82.3

 
93.6

Removal costs - recovered through depreciation rates (Note 9) (a)
44.8

 
40.1

Retail rate deferrals - recovered through rate riders as rates are redetermined monthly or annually
4.4

 
4.3

Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
4.3

 
4.2

Unamortized loss on reacquired debt - recovered over term of debt
3.0

 
3.4

Rate case costs - recovered over a 6-year period through September 2021 (Note 2 - Retail Rate Proceedings)
2.6

 
3.0

Michoud plant maintenance – recovered over a 7-year period through September 2018
1.4

 
3.3

Other
5.8

 
7.4

Entergy New Orleans Total

$251.4

 

$268.1



Entergy Texas
 
2017
 
2016
 
(In Millions)
Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 5 - Entergy Texas Securitization Bonds)

$386.1

 

$442.4

Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
169.2

 
201.7

Transition to competition costs - recovered over a 15-year period through February 2021
37.7

 
47.9

Removal costs - recovered through depreciation rates (Note 9) (a)
55.2

 
33.5

Unamortized loss on reacquired debt - recovered over term of debt
8.7

 
9.0

Other
4.5

 
5.7

Entergy Texas Total

$661.4

 

$740.2



System Energy
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans and Other Postretirement Benefits) (a)

$202.7

 

$193.5

Asset retirement obligation - recovery dependent upon timing of decommissioning (Note 9) (a)
169.1

 
142.5

Removal costs - recovered through depreciation rates (Note 9) (a)
67.9

 
69.7

Unamortized loss on reacquired debt - recovered over term of debt
4.6

 
5.5

System Energy Total

$444.3

 

$411.2



(a)
Does not earn a return on investment, but is offset by related liabilities.
(b)
Does not earn a return on investment.
Other Regulatory Liabilities

Entergy
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)

$989.3

 

$735.5

Vidalia purchased power agreement (Note 8) (b)
151.6

 
202.4

Louisiana Act 55 financing savings obligation (Note 2 - Storm Cost Recovery Filings with Retail Regulators) (b)
124.8

 
165.5

Grand Gulf sale-leaseback - (Note 10 - Sale and Leaseback Transactions)
67.9

 
67.9

Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates beginning December 2015 through November 2024 (Note 2 - Entergy Louisiana and Entergy Gulf States Louisiana Business Combination)
65.8

 
83.5

Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4

 
44.4

Asset retirement obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
36.7

 
32.7

Removal costs - returned to customers through depreciation rates (Note 9) (a)
32.4

 
53.9

Entergy Mississippis accumulated accelerated Grand Gulf amortization - amortized and credited through the Unit Power Sales Agreement
32.1

 
39.3

Waterford 3 replacement steam generator provision (Note 2 - Retail Rate Proceedings)

 
68.0

Other
43.5

 
79.8

Entergy Total

$1,588.5

 

$1,572.9


Entergy Arkansas
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)

$354.0

 

$280.8

Other
9.6

 
25.1

Entergy Arkansas Total

$363.6

 

$305.9



Entergy Louisiana
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)

$323.7

 

$235.4

Vidalia purchased power agreement (Note 8) (b)
151.6

 
202.4

Louisiana Act 55 financing savings obligation (Note 2 - Storm Cost Recovery Filings with Retail Regulators) (b)
124.8

 
165.5

Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates beginning December 2015 through November 2024 (Note 2 - Entergy Louisiana and Entergy Gulf States Louisiana Business Combination)
65.8

 
83.5

Gas hedging costs - refunded through fuel rates (Note 15 - Derivatives)

 
10.9

Asset Retirement Obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
36.7

 
32.7

Removal costs - returned to customers through depreciation rates (Note 9) (a)
32.4

 
53.9

Waterford 3 replacement steam generator provision (Note 2 - Retail Rate Proceedings)

 
68.0

Other
26.1

 
28.7

Entergy Louisiana Total

$761.1

 

$881.0



Entergy Texas
 
2017
 
2016
 
(In Millions)
Transition to competition costs - returned to customers through rate riders when rates are redetermined periodically

$4.8

 

$6.2

Other
2.1

 
2.3

Entergy Texas Total

$6.9

 

$8.5


System Energy
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 17) (a)

$311.6

 

$219.3

Grand Gulf sale-leaseback - (Note 10 - Sale and Leaseback Transactions)
67.9

 
67.9

Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4

 
44.4

Entergy Mississippis accumulated accelerated Grand Gulf amortization - amortized and credited through the Unit Power Sales Agreement
32.1

 
39.3

System Energy Total

$456.0

 

$370.9



(a)
Offset by related asset.
(b)
As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21% effective January 2018, the Vidalia purchased power agreement regulatory liability was reduced by $30.5 million and the Louisiana Act 55 financing savings obligation regulatory liabilities were reduced by $25.0 million, with corresponding increases to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

Regulatory activity regarding the Tax Cuts and Jobs Act

See the “Other Tax Matters - Tax Cuts and Jobs Act” section in Note 3 to the financial statements for discussion of the effects of the enactment of the Tax Cuts and Jobs Act, in December 2017, including its effects on Entergy’s and the Registrant Subsidiaries’ regulatory asset/liability for income taxes.

After enactment of the Tax Cuts and Jobs Act the APSC issued an order that applies to investor-owned utilities in Arkansas, including Entergy Arkansas. The order requests information regarding certain effects of the Tax Cuts and Jobs Act and requires the utilities to begin, effective January 1, 2018, to record regulatory liabilities to record the effects of the Act, subject to review by the APSC, although the order acknowledges that the exact amount of tax savings and rate reductions cannot be determined at this time. Entergy Arkansas requested clarification or, in the alternative, rehearing regarding the requirement to record a regulatory liability, and also responded to the request for information. In its request for clarification Entergy Arkansas sought clarification that the amount of any regulatory liability would be determined only after the utilities are heard and present evidence on the issue, as this otherwise would be arbitrary and could implicate single-issue and retroactive ratemaking. The APSC has not responded to the request for clarification. In its response to the APSC’s request for information Entergy Arkansas states that its formula rate plan rider already provides the means for customers to realize the benefits of the Act, except for the return of unprotected excess accumulated deferred income taxes. Entergy Arkansas’s next formula rate plan filing is scheduled for July 2018. Entergy Arkansas intends to return unprotected excess accumulated deferred income taxes as expeditiously as possible, subject to a subsequent request to be made by Entergy Arkansas and approval by the APSC.

After enactment of the Tax Cuts and Jobs Act the LPSC passed an agenda item requiring utilities, including Entergy Louisiana, to file reports regarding certain effects of the Act. Entergy Louisiana responded to the directive and stated in its response that it is working with the LPSC staff and other interested parties to extend its formula rate plan such that its next base rate change will occur effective September 2018, or it would file a base rate case. Entergy Louisiana went on to state that if the formula rate plan is extended Entergy Louisiana’s next adjustment of rates will reflect the new 21% federal corporate income tax rate. Entergy Louisiana stated that it is working with the LPSC staff and interested parties to determine when the tax rate reduction will be reflected in rates, along with when and how the excess accumulated deferred income taxes will be reflected in rates, and how certain tax sharing agreement customer credits will be adjusted. On February 21, 2018, the LPSC issued a special order requiring that all LPSC-jurisdictional utilities, beginning as of January 1, 2018, record as a regulatory liability (deferred liability) the amount required to reflect the reduction in the federal corporate income tax rate from 35% to 21% and the associated savings in excess accumulated deferred income taxes until such time as its rates are changed by the LPSC to reflect these federal tax savings. In the same special order, the LPSC also initiated a new rulemaking docket to consider these issues and the appropriate manner in which to flow through the benefits to Louisiana customers and to provide an opportunity for discovery and comments of jurisdictional utilities and other interested stakeholders. The rulemaking further requires the LPSC staff to report back to the LPSC as soon as practicable and preferably by the March 21, 2018, LPSC Business and Executive Session with recommendations as to how the federal tax-related benefits will be flowed through to Louisiana customers.

After enactment of the Tax Cuts and Jobs Act the MPSC ordered utilities, including Entergy Mississippi, that operate under a formula rate plan to file a description by February 26, 2018, of how the Act will be reflected in the formula rate plan under which the utility operates. In addition to the description that is due February 26, 2018, Entergy Mississippi’s formula rate plan 2018 test year filing is scheduled to be filed by March 15, 2018.

After enactment of the Tax Cuts and Jobs Act the City Council passed a resolution ordering Entergy New Orleans to, effective January 1, 2018, record deferred regulatory liabilities to account for the Act’s effect on Entergy New Orleans’s revenue requirement and to make a filing by mid-March 2018 regarding the Act’s effects on Entergy New Orleans’s operating income and rate base and potential mechanisms for customers to receive benefits of the Act. The resolution also directed Entergy New Orleans to request that Entergy Services file with the FERC for revisions of the Unit Power Sales Agreement and MSS-4 replacement tariffs to address the return of excess accumulated deferred income taxes. Entergy plans to make such filings with the FERC by the end of March 2018.
After enactment of the Tax Cuts and Jobs Act the PUCT issued an order requiring most utilities, including Entergy Texas, beginning January 25, 2018, to record a regulatory liability for the difference between revenues collected under existing rates and revenues that would have been collected had existing rates been set using the new federal income tax rates and also for the balance of excess accumulated deferred income taxes. The order also directs the PUCT staff to investigate each investor-owned utility on a case-by-case basis to determine the appropriate mechanism to adjust its rates to reflect the changes under the Act. In both a memorandum issued prior to the open meeting when the order was discussed and during the discussions at the open meeting discussing the order, the PUCT indicated that it would consider utility earnings in determining the treatment of the liability and the effects of the Act. Entergy Texas had previously provided information to the PUCT Staff in the docket and stated that it expects the PUCT to address the lower tax expense as part of Entergy Texas’s rate case expected to be filed in May 2018. Entergy Texas also stated that it would be inappropriate for the PUCT to require a refund of the reduction in income tax expense in 2018 resulting from the Act on a retroactive basis and without a comprehensive review of Entergy Texas’s cost of service and earned return on equity. In a subsequent order issued following the February 2018 open meeting, the PUCT clarified that carrying costs need not be recorded as part of the regulatory liability.

The Registrant Subsidiaries will continue to work with their respective regulators to determine the appropriate path forward in each jurisdiction regarding the effects of the Act.

Fuel and purchased power cost recovery

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas are allowed to recover fuel and purchased power costs through fuel mechanisms included in electric and gas rates that are recorded as fuel cost recovery revenues.  The difference between revenues collected and the current fuel and purchased power costs is generally recorded as “Deferred fuel costs” on the Utility operating companies’ financial statements.  The table below shows the amount of deferred fuel costs as of December 31, 2017 and 2016 that Entergy expects to recover (or return to customers) through fuel mechanisms, subject to subsequent regulatory review.
 
2017
 
2016
 
(In Millions)
Entergy Arkansas (a)

$130.4

 

$163.6

Entergy Louisiana (b)

$96.7

 

$119.9

Entergy Mississippi

$32.4

 

$7.0

Entergy New Orleans (b)

($3.7
)
 

$8.9

Entergy Texas

($67.3
)
 

($54.5
)

(a)
Includes $67.1 million in 2017 and $66.9 million in 2016 of fuel and purchased power costs, which do not currently earn a return on investment and whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.
(b)
Includes $168.1 million in each year for Entergy Louisiana and $4.1 million in each year for Entergy New Orleans of fuel, purchased power, and capacity costs, which do not currently earn a return on investment and whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.

Entergy Arkansas

Production Cost Allocation Rider

The APSC approved a production cost allocation rider for recovery from customers of the retail portion of the costs allocated to Entergy Arkansas as a result of the System Agreement proceedings, which are discussed in the “System Agreement Cost Equalization Proceedings” section below.  These costs cause an increase in Entergy Arkansas’s deferred fuel cost balance because Entergy Arkansas pays the costs over seven months but collects the costs from customers over twelve months.

In May 2014, Entergy Arkansas filed its annual redetermination of the production cost allocation rider to recover the $3 million unrecovered retail balance as of December 31, 2013 and the $67.8 million System Agreement bandwidth remedy payment made in May 2014 as a result of the compliance filing pursuant to the FERC’s February 2014 orders related to the bandwidth payments/receipts for the June - December 2005 period. In January 2015 the APSC issued an order approving Entergy Arkansas’s request for recovery of the $3 million under-recovered amount based on the true-up of the production cost allocation rider and the $67.8 million May 2014 System Agreement bandwidth remedy payment subject to refund with interest, with recovery of these payments concluding with the last billing cycle in December 2015. The APSC also found that Entergy Arkansas is entitled to carrying charges pursuant to the current terms of the production cost allocation rider. Entergy Arkansas made its compliance filing pursuant to the order in January 2015 and the APSC issued its approval order, also in January 2015. The redetermined rate went into effect with the first billing cycle of February 2015.

In May 2015, Entergy Arkansas filed its annual redetermination of the production cost allocation rider, which included a $38 million payment made by Entergy Arkansas as a result of the FERC’s February 2014 order related to the comprehensive bandwidth recalculation for calendar year 2006, 2007, and 2008 production costs. The redetermined rate for the 2015 production cost allocation rider update was added to the redetermined rate from the 2014 production cost allocation rider update and the combined rate was effective with the first billing cycle of July 2015. This combined rate was effective through December 2015. The collection of the remainder of the redetermined rate for the 2015 production cost allocation rider update continued through June 2016.

In May 2016, Entergy Arkansas filed its annual redetermination pursuant to the production cost allocation rider, which reflected recovery of the production cost allocation rider true-up adjustment of the 2014 and 2015 unrecovered retail balance in the amount of $1.9 million. Additionally, the redetermined rates reflected the recovery of a $1.9 million System Agreement bandwidth remedy payment resulting from a compliance filing pursuant to the FERC’s December 2015 order related to test year 2009 production costs. The rates for the 2016 production cost allocation rider update became effective with the first billing cycle of July 2016, and the rates were effective through June 2017.

In May 2017, Entergy Arkansas filed its annual redetermination pursuant to the production cost allocation rider, which reflected a credit amount of $0.3 million resulting from a compliance filing pursuant to the FERC’s September 2016 order. Additionally, the redetermined rate reflected recovery of the production cost allocation rider true-up adjustment of the 2016 unrecovered retail balance in the amount of $0.3 million. Because of the small effect of the 2017 production cost allocation rider update, Entergy Arkansas proposed to reduce the effective period of the update to one month, July 2017. After the one month collection period, rates were set to zero for all rate classes for the period August 2017 through June 2018.

Energy Cost Recovery Rider

Entergy Arkansas’s retail rates include an energy cost recovery rider to recover fuel and purchased energy costs in monthly customer bills.  The rider utilizes the prior calendar-year energy costs and projected energy sales for the twelve-month period commencing on April 1 of each year to develop an energy cost rate, which is redetermined annually and includes a true-up adjustment reflecting the over- or under-recovery, including carrying charges, of the energy costs for the prior calendar year.  The energy cost recovery rider tariff also allows an interim rate request depending upon the level of over- or under-recovery of fuel and purchased energy costs.

In January 2014, Entergy Arkansas filed a motion with the APSC relating to its redetermination of its energy cost rate that was subsequently filed in March 2014. In that motion, Entergy Arkansas requested that the APSC authorize Entergy Arkansas to exclude $65.9 million of deferred fuel and purchased energy costs incurred in 2013 from the redetermination of its 2014 energy cost rate. The $65.9 million is an estimate of the incremental fuel and replacement energy costs that Entergy Arkansas incurred as a result of the ANO stator incident. Entergy Arkansas requested that the APSC authorize Entergy Arkansas to retain that amount in its deferred fuel balance, with recovery to be reviewed in a later period after more information is available regarding various claims associated with the ANO stator incident. The APSC approved Entergy Arkansas’s request in February 2014. In July 2017, Entergy Arkansas filed for a change in rates pursuant to its formula rate plan rider. In that docket, the APSC approved a settlement agreement agreed upon by the parties, including a provision that requires Entergy Arkansas to initiate a docket for the purpose of recovering funds currently withheld from rates and related to the stator incident, including the $65.9 million of deferred fuel and purchased energy costs previously noted, subject to certain timelines and conditions set forth in the settlement agreement. See the “ANO Damage, Outage, and NRC Reviews” section in Note 8 to the financial statements for further discussion of the ANO stator incident.

In March 2017, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01164 per kWh to $0.01547 per kWh. The APSC staff filed testimony in March 2017 recommending that the redetermined rate be implemented with the first billing cycle of April 2017 under the normal operation of the tariff. Accordingly, the redetermined rate went into effect on March 31, 2017 pursuant to the tariff. In July 2017 the Arkansas Attorney General requested additional information to support certain of the costs included in Entergy Arkansas’s 2017 energy cost rate redetermination.

Entergy Louisiana

Entergy Louisiana recovers electric fuel and purchased power costs for the billing month based upon the level of such costs incurred two months prior to the billing month. Entergy Louisiana’s purchased gas adjustments include estimates for the billing month adjusted by a surcharge or credit that arises from an annual reconciliation of fuel costs incurred with fuel cost revenues billed to customers, including carrying charges.

In April 2010 the LPSC authorized its staff to initiate an audit of Entergy Louisiana’s fuel adjustment clause filings.  The audit included a review of the reasonableness of charges flowed through the fuel adjustment clause by Entergy Louisiana for the period from 2005 through 2009.  The LPSC staff issued its audit report in January 2013.  The LPSC staff recommended that Entergy Louisiana refund approximately $1.9 million, plus interest, to customers and realign the recovery of approximately $1 million from Entergy Louisiana’s fuel adjustment clause to base rates.  The recommended refund was made by Entergy Louisiana in May 2013 in the form of a credit to customers through its fuel adjustment clause filing. In October 2016 the LPSC staff filed testimony affirming the recommendation in its audit report on the lone remaining issue that nuclear dry fuel storage costs should be realigned to base rates. The parties agreed to remove that remaining issue to a separate docket because the same issue was outstanding in the Entergy Gulf States Louisiana audit for the same time period. In November 2016 the LPSC approved the resolution of this audit and the creation of a new docket for the resolution of the proper method of recovery for nuclear dry fuel storage costs. In December 2016 the LPSC opened a new docket in order to resolve the issue regarding the proper methodology for the recovery of nuclear dry fuel storage costs. In October 2017 the LPSC approved the continued recovery of the nuclear dry fuel storage costs through the fuel adjustment clause, resolving the open issue in the audit.

In December 2011 the LPSC authorized its staff to initiate a proceeding to audit the fuel adjustment clause filings of Entergy Gulf States Louisiana and its affiliates.  The audit included a review of the reasonableness of charges flowed by Entergy Gulf States Louisiana through its fuel adjustment clause for the period 2005 through 2009.  In March 2016 the LPSC staff consultant issued its audit report. In its report, the LPSC staff consultant recommended that Entergy Louisiana refund approximately $8.6 million, plus interest, to customers and realign the recovery of approximately $12.7 million from Entergy Gulf States Louisiana’s fuel adjustment clause to base rates. In September 2016 the LPSC staff filed testimony stating that it was no longer recommending a disallowance of $3.4 million of the $8.6 million discussed above, but otherwise maintained positions from its report. Subsequently, the parties entered into a settlement, which was approved by the LPSC in November 2016. The settlement recognized the dry cask storage recovery method issue, which was addressed in the separate proceeding approved by the LPSC in October 2017, provided for a refund of $5 million, which was made to legacy Entergy Gulf States Louisiana customers in December 2016, and resolved all other issues raised in the audit.
In July 2014 the LPSC authorized its staff to initiate an audit of Entergy Gulf States Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed by Entergy Gulf States Louisiana through its fuel adjustment clause for the period from 2010 through 2013. Discovery commenced in July 2015. No report of audit has been issued.

In July 2014 the LPSC authorized its staff to initiate an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed by Entergy Louisiana through its fuel adjustment clause for the period from 2010 through 2013. Discovery commenced in July 2015. No report of audit has been issued.

In June 2016 the LPSC staff provided notice of audits of Entergy Louisiana’s fuel adjustment clause filings and purchased gas adjustment clause filings. In recognition of the business combination that occurred in 2015, the audit notice was issued to Entergy Louisiana and will also include a review of charges to legacy Entergy Gulf States Louisiana customers prior to the business combination. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s fuel adjustment clause for the period from 2014 through 2015 and charges flowed through Entergy Louisiana’s purchased gas adjustment clause for the period from 2012 through 2015. Discovery commenced in March 2017. No report of audit has been issued.

Due to higher fuel costs for the operating month of January 2018 resulting in part from recent cold weather, higher Henry Hub prices, and an increase in total fuel and purchased power costs, Entergy Louisiana plans to cap the average fuel adjustment charge to be billed in March 2018 at $0.03060 per kWh and to defer billing of all fuel costs in excess of the capped amounts by including such costs in the over- or under-recovery account.

Entergy Mississippi

Entergy Mississippi’s rate schedules include an energy cost recovery rider that is adjusted annually to reflect accumulated over- or under-recoveries.  Entergy Mississippi’s fuel cost recoveries are subject to annual audits conducted pursuant to the authority of the MPSC.

Entergy Mississippi had a deferred fuel over-recovery balance of $58.3 million as of May 31, 2015, along with an under-recovery balance of $12.3 million under the power management rider. Pursuant to those tariffs, in July 2015, Entergy Mississippi filed for interim adjustments under both the energy cost recovery rider and the power management rider to flow through to customers the approximately $46 million net over-recovery over a six-month period. In August 2015, the MPSC approved the interim adjustments effective with September 2015 bills. In November 2015, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included a projected over-recovery balance of $48 million projected through January 31, 2016. In January 2016 the MPSC approved the redetermined annual factor effective February 1, 2016. The MPSC further ordered, however, that due to the significant change in natural gas price forecasts since Entergy Mississippi’s filing in November 2015 Entergy Mississippi should file a revised fuel factor with the MPSC no later than February 1, 2016. Pursuant to that order, Entergy Mississippi submitted a revised fuel factor. Additionally, because Entergy Mississippi’s projected over-recovery balance for the period ending January 31, 2016 was $68 million, in February 2016, Entergy Mississippi filed for another interim adjustment to the energy cost factor effective April 2016 to flow through to customers the projected over-recovery balance over a six-month period. That interim adjustment was approved by the MPSC in February 2016 effective for April 2016 bills.

In November 2016, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an over-recovery of less than $2 million as of September 30, 2016. In January 2017 the MPSC approved the annual factor effective with February 2017 bills. Also in January 2017 the MPSC certified to the Mississippi Legislature the audit reports of its independent auditors for the fuel year ending September 30, 2016. In its order, the MPSC expressly reserved the right to review and determine the recoverability of any and all purchased power expenditures made during fiscal year 2016. The MPSC hired independent auditors to conduct an annual operations audit and a financial audit. The independent auditors issued their audit reports in December 2017. The audit reports included several recommendations for action by Entergy Mississippi but did not recommend any cost disallowances. In January 2018 the MPSC certified the audit reports to the Mississippi Legislature. In November 2017 the Public Utilities Staff separately engaged a consultant to review the outage at the Grand Gulf Nuclear Station that began in 2016. The review is currently in progress.

In November 2017, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an under-recovery of approximately $61.5 million as of September 30, 2017. Entergy Mississippi proposed a two-tiered energy cost factor designed to promote overall rate stability throughout 2018 particularly during the summer months. In January 2018 the MPSC approved the proposed energy cost factors effective for February 2018 bills.

Mississippi Attorney General Complaint

The Mississippi attorney general filed a complaint in state court in December 2008 against Entergy Corporation, Entergy Mississippi, Entergy Services, and Entergy Power alleging, among other things, violations of Mississippi statutes, fraud, and breach of good faith and fair dealing, and requesting an accounting and restitution.  The complaint is wide ranging and relates to tariffs and procedures under which Entergy Mississippi purchases power not generated in Mississippi to meet electricity demand.  Entergy believes the complaint is unfounded.  In December 2008 the defendant Entergy companies removed the Attorney General’s lawsuit to U.S. District Court in Jackson, Mississippi.  The Mississippi attorney general moved to remand the matter to state court.  In August 2012 the District Court issued an opinion denying the Attorney General’s motion for remand, finding that the District Court has subject matter jurisdiction under the Class Action Fairness Act.

The defendant Entergy companies answered the complaint and filed a counterclaim for relief based upon the Mississippi Public Utilities Act and the Federal Power Act.  In May 2009 the defendant Entergy companies filed a motion for judgment on the pleadings asserting grounds of federal preemption, the exclusive jurisdiction of the MPSC, and factual errors in the Attorney General’s complaint.  In September 2012 the District Court heard oral argument on Entergy’s motion for judgment on the pleadings.

In January 2014 the U.S. Supreme Court issued a decision in which it held that cases brought by attorneys general as the sole plaintiff to enforce state laws were not considered “mass actions” under the Class Action Fairness Act, so as to establish federal subject matter jurisdiction. One day later the Attorney General renewed his motion to remand the Entergy case back to state court, citing the U.S. Supreme Court’s decision. The defendant Entergy companies responded to that motion reiterating the additional grounds asserted for federal question jurisdiction, and the District Court held oral argument on the renewed motion to remand in February 2014. In April 2015 the District Court entered an order denying the renewed motion to remand, holding that the District Court has federal question subject matter jurisdiction. The Attorney General appealed to the U.S. Fifth Circuit Court of Appeals the denial of the motion to remand. In July 2015 the Fifth Circuit issued an order denying the appeal, and the Attorney General subsequently filed a petition for rehearing of the request for interlocutory appeal, which was also denied. In December 2015 the District Court ordered that the parties submit to the court undisputed and disputed facts that are material to the Entergy defendants’ motion for judgment on the pleadings, as well as supplemental briefs regarding the same. Those filings were made in January 2016.

In September 2016 the Attorney General filed a mandamus petition with the U.S. Fifth Circuit Court of Appeals in which the Attorney General asked the Fifth Circuit to order the chief judge to reassign this case to another judge. In September 2016 the District Court denied the Entergy companies’ motion for judgment on the pleadings. The Entergy companies filed a motion seeking to amend the District Court’s order denying the Entergy companies’ motion for judgment on the pleadings and allowing an interlocutory appeal. In October 2016 the Fifth Circuit granted the Attorney General’s motion for writ of mandamus and directed the chief judge to assign the case to a new judge. The case was reassigned in October 2016. In January 2017 the District Court denied the Entergy companies’ motion to amend the order denying the motion for judgment on the pleadings. In June 2017 the District Court issued a case management order setting a trial date in November 2018. Discovery is currently in progress.
Entergy New Orleans

Entergy New Orleans’s electric rate schedules include a fuel adjustment tariff designed to reflect no more than targeted fuel and purchased power costs, adjusted by a surcharge or credit for deferred fuel expense arising from the monthly reconciliation of actual fuel and purchased power costs incurred with fuel cost revenues billed to customers, including carrying charges.
 
Entergy New Orleans’s gas rate schedules include a purchased gas adjustment to reflect estimated gas costs for the billing month, adjusted by a surcharge or credit similar to that included in the electric fuel adjustment clause, including carrying charges.

Due to higher fuel costs associated in part with the extended Grand Gulf outage and the partially simultaneous Union Power Block 1 planned outage, for the December 2016, January 2017, and February 2017 billing months, the City Council authorized Entergy New Orleans to cap the fuel adjustment charge billed to customers at $0.035 per kWh and to defer billing of all fuel costs in excess of the capped amount by including such costs in the over- or under-recovery account.

Due to higher fuel costs for the operating month of January 2018 resulting in part from recent cold weather, higher Henry Hub prices, and an increase in total fuel and purchased power costs associated in part with certain plant outages, Entergy New Orleans has proposed to cap the fuel adjustment charge to be billed in March 2018 to non-transmission Entergy New Orleans legacy customers and Entergy New Orleans Algiers customers at $0.035323 per kWh and $0.025446 per kWh, respectively. Entergy New Orleans has also proposed to cap the fuel adjustment charge to be billed in March 2018 for Entergy New Orleans legacy transmission customers at $0.034609 per kWh and to defer billing of all fuel costs in excess of the capped amount by including such costs in the over- or under-recovery account.

Entergy Texas

Entergy Texas’s rate schedules include a fixed fuel factor to recover fuel and purchased power costs, including interest, not recovered in base rates.   Semi-annual revisions of the fixed fuel factor are made in March and September based on the market price of natural gas and changes in fuel mix.  The amounts collected under Entergy Texas’s fixed fuel factor and any interim surcharge or refund are subject to fuel reconciliation proceedings before the PUCT.
        
In August 2014, Entergy Texas filed an application seeking PUCT approval to implement an interim fuel refund of approximately $24.6 million for over-collected fuel costs incurred during the months of November 2012 through April 2014. This refund resulted from (i) applying $48.6 million in bandwidth remedy payments that Entergy Texas received in May 2014 related to the June - December 2005 period to Entergy Texas’s $8.7 million under-recovered fuel balance as of April 30, 2014 and (ii) netting that fuel balance against the $15.3 million bandwidth remedy payment that Entergy Texas made related to calendar year 2013 production costs. Also in August 2014, Entergy Texas filed an unopposed motion for interim rates to implement these refunds for most customers over a two-month period commencing with September 2014. The PUCT issued its order approving the interim relief in August 2014 and Entergy Texas completed the refunds in October 2014. Parties intervened in this matter, and all parties agreed that the proceeding should be bifurcated such that the proposed interim refund would become final in a separate proceeding, which refund was approved by the PUCT in March 2015.   In July 2015 certain parties filed briefs in the open proceeding asserting that Entergy Texas should refund to retail customers an additional $10.9 million in bandwidth remedy payments Entergy Texas received related to calendar year 2006 production costs.  In October 2015 an ALJ issued a proposal for decision recommending that the additional $10.9 million in bandwidth remedy payments be refunded to retail customers. In January 2016 the PUCT issued its order affirming the ALJ’s recommendation, and Entergy Texas filed a motion for rehearing of the PUCT’s decision, which the PUCT denied. In March 2016, Entergy Texas filed a complaint in Federal District Court for the Western District of Texas and a petition in the Travis County (State) District Court appealing the PUCT’s decision. The pending appeals did not stay the PUCT’s decision. In April 2016, Entergy Texas filed with the PUCT an application to refund to customers approximately $56.2 million. The refund resulted from (i) $41.8 million of fuel cost recovery over-collections through February 2016, (ii) the $10.9 million in bandwidth remedy payments, discussed above, that Entergy Texas received related to calendar year 2006 production costs, and (iii) $3.5 million in bandwidth remedy payments that Entergy Texas received related to 2006-2008 production costs. In June 2016, Entergy Texas filed an unopposed settlement agreement that added additional over-recovered fuel costs for the months of March and April 2016. The settlement resulted in a $68 million refund. The ALJ approved the refund on an interim basis to be made to most customers over a four-month period beginning with the first billing cycle of July 2016. In July 2016 the PUCT issued an order approving the interim refund. The federal appeal of the PUCT’s January 2016 decision was heard in December 2016, and the Federal District Court granted Entergy Texas’s requested relief. In January 2017 the PUCT and an intervenor filed petitions for appeal to the U.S. Court of Appeals for the Fifth Circuit of the Federal District Court ruling. Oral argument was held before the U.S. Court of Appeals for the Fifth Circuit in February 2018, and a decision is pending. The State District Court appeal of the PUCT’s January 2016 decision also remains pending.

In July 2016, Entergy Texas filed an application to reconcile its fuel and purchased power costs for the period April 1, 2013 through March 31, 2016. Under a recent PUCT rule change, a fuel reconciliation is required to be filed at least once every three years and outside of a base rate case filing. During the reconciliation period, Entergy Texas incurred approximately $1.77 billion in Texas jurisdictional eligible fuel and purchased power expenses, net of certain revenues credited to such expenses and other adjustments. Entergy Texas estimated an over-recovery balance of approximately $19.3 million, including interest, which Entergy Texas requested authority to carry over as the beginning balance for the subsequent reconciliation period beginning Apri1 2016. Entergy Texas also noted, however, that the estimated $19.3 million over collection was being refunded to customers as a portion of the interim fuel refund beginning with the first billing cycle of July 2016, discussed above. Entergy Texas also requested a prudence finding for each of the fuel-related contracts and arrangements entered into or modified during the reconciliation period that have not been reviewed by the PUCT in a prior proceeding. In December 2016, Entergy Texas entered into a stipulation and settlement agreement resulting in a $6 million disallowance not associated with any particular issue raised and a refund of the over-recovery balance of $21 million as of November 30, 2016, to most customers beginning April 2017 through June 2017. This settlement was developed concurrently with the stipulation and settlement agreement in the 2016 transmission cost recovery factor rider amendment discussed below, and the terms and conditions in both settlements are interdependent. The fuel reconciliation settlement was approved by the PUCT in March 2017 and the refunds were made.

In June 2017, Entergy Texas filed an application for a fuel refund of approximately $30.7 million for the months of December 2016 through April 2017. For most customers, the refunds flowed through bills for the months of July 2017 through September 2017. The fuel refund was approved by the PUCT in August 2017.

In December 2017, Entergy Texas filed an application for a fuel refund of approximately $30.5 million for the months of May 2017 through October 2017. Also in December 2017, the PUCT’s ALJ approved the refund on an interim basis. For most customers, the refunds flowed through bills beginning January 2018 and will continue through March 2018. A final decision in this matter remains pending.
    
Retail Rate Proceedings

Filings with the APSC (Entergy Arkansas)

Retail Rates

2015 Base Rate Filing
 
In April 2015, Entergy Arkansas filed with the APSC for a general change in rates, charges, and tariffs. The filing notified the APSC of Entergy Arkansas’s intent to implement a forward test year formula rate plan pursuant to Arkansas legislation passed in 2015, and requested a retail rate increase of $268.4 million, with a net increase in revenue of $167 million. The filing requested a 10.2% return on common equity. In September 2015 the APSC staff and intervenors filed direct testimony, with the APSC staff recommending a revenue requirement of $217.9 million and a 9.65% return on common equity. In December 2015, Entergy Arkansas, the APSC staff, and certain of the intervenors in the rate case filed with the APSC a joint motion for approval of a settlement of the case that proposed a retail rate increase of approximately $225 million with a net increase in revenue of approximately $133 million; an authorized return on common equity of 9.75%; and a formula rate plan tariff that provides a +/- 50 basis point band around the 9.75% allowed return on common equity. A significant portion of the rate increase is related to Entergy Arkansas’s acquisition in March 2016 of Union Power Station Power Block 2 for a base purchase price of $237 million. The settlement agreement also provided for amortization over a 10-year period of $7.7 million of previously-incurred costs related to ANO post-Fukushima compliance and $9.9 million of previously-incurred costs related to ANO flood barrier compliance. A settlement hearing was held in January 2016. In February 2016 the APSC approved the settlement with one exception that reduced the retail rate increase proposed in the settlement by $5 million. The settling parties agreed to the APSC modifications in February 2016. The new rates were effective February 24, 2016 and began billing with the first billing cycle of April 2016. In March 2016, Entergy Arkansas made a compliance filing regarding the new rates that included an interim base rate adjustment surcharge, effective with the first billing cycle of April 2016, to recover the incremental revenue requirement for the period February 24, 2016 through March 31, 2016. The interim base rate adjustment surcharge was designed to recover a total of $21.1 million over the nine-month period from April 2016 through December 2016.

2016 Formula Rate Plan Filing
    
In July 2016, Entergy Arkansas filed with the APSC its 2016 formula rate plan filing showing Entergy Arkansas’s projected earned return on common equity for the twelve months ended December 31, 2017 test period to be below the formula rate plan bandwidth. The filing requested a $67.7 million revenue requirement increase to achieve Entergy Arkansas’s target earned return on common equity of 9.75%. In October 2016, Entergy Arkansas filed with the APSC revised formula rate plan attachments with an updated request for a $54.4 million revenue requirement increase based on acceptance of certain adjustments and recommendations made by the APSC staff and other intervenors, as well as three additional adjustments identified as appropriate by Entergy Arkansas. In November 2016 a hearing was held and the APSC issued an order directing the parties to brief certain issues. In December 2016 the APSC approved the settlement agreement and the $54.4 million revenue requirement increase with approximately $25 million of the $54.4 million revenue requirement subject to possible future adjustment and refund to customers with interest. The APSC requested supplemental information for some of Entergy Arkansas’s requested nuclear expenditures. In December 2016 the APSC approved Entergy Arkansas’s formula rate plan compliance tariff, and the rates became effective with the first billing cycle of January 2017. In April 2017, Entergy Arkansas filed a motion consented to by all parties requesting that it be permitted to submit the supplemental information requested by the APSC in conjunction with its 2017 formula rate plan filing, which was subsequently made in July 2017 and is discussed below. In May 2017 the APSC approved the joint motion and proposal to review Entergy Arkansas’s supplemental information on a concurrent schedule with the 2017 formula rate plan filing. In October 2017, Entergy Arkansas and the parties to the proceeding filed a joint motion to approve a unanimous settlement agreement resolving all issues in the docket and providing for recovery of the 2017 and 2018 nuclear costs. In December 2017 the APSC approved the settlement agreement and recovery of the 2017 and 2018 nuclear costs.

2017 Formula Rate Plan Filing

In July 2017, Entergy Arkansas filed with the APSC its 2017 formula rate plan filing showing Entergy Arkansas’s projected earned return on common equity for the twelve months ended December 31, 2018 test period to be below the formula rate plan bandwidth.  The filing projected a $129.7 million revenue requirement increase to achieve Entergy Arkansas’s target earned return on common equity of 9.75%.  Entergy Arkansas’s formula rate plan is subject to a four percent annual revenue constraint and the projected annual revenue requirement increase exceeded the four percent, resulting in a proposed increase for the 2017 formula rate plan of $70.9 million. In October 2017, Entergy Arkansas filed with the APSC revised formula rate plan attachments that projected a $126.2 million revenue requirement increase based on acceptance of certain adjustments and recommendations made by the APSC staff and other intervenors. The revised formula rate plan filing included a proposed $71.1 million revenue requirement increase based on a revision to the four percent constraint calculation. In October 2017, Entergy Arkansas and the parties to the proceeding filed a joint motion to approve a unanimous settlement agreement resolving all issues in the docket and providing for recovery of the 2017 and 2018 nuclear costs. In December 2017 the APSC approved the settlement agreement and the $71.1 million revenue requirement increase, as well as Entergy Arkansas’s formula rate plan compliance tariff, and the rates became effective with the first billing cycle of January 2018.
 
Internal Restructuring

In November 2017, Entergy Arkansas filed an application with the APSC seeking authorization to undertake a restructuring that would result in the transfer of substantially all of the assets and operations of Entergy Arkansas to a new entity, which would ultimately be owned by an existing Entergy subsidiary holding company. The restructuring is subject to regulatory review and approval by the APSC, the FERC, and the NRC. Entergy Arkansas also filed a notice with the Missouri Public Service Commission in December 2017 out of an abundance of caution, although Entergy Arkansas does not serve any retail customers in Missouri. If the APSC approves the restructuring by September 1, 2018, and the restructuring closes on or before December 1, 2018, Entergy Arkansas proposed in its application to credit retail customers $66 million over six years, beginning in 2019. In February 2018, Entergy Arkansas filed supplemental testimony reducing the proposed retail customer credits to $39.6 million over six years. If the APSC, the FERC, and the NRC approvals are obtained, Entergy Arkansas expects the restructuring will be consummated on or before December 1, 2018.
It is currently contemplated that Entergy Arkansas would undertake a multi-step restructuring, which would include the following:
Entergy Arkansas would redeem its outstanding preferred stock at the aggregate redemption price of approximately $32.7 million, which includes call premiums, plus accumulated and unpaid dividends, if any.
Entergy Arkansas would convert from an Arkansas corporation to a Texas corporation.
Under the Texas Business Organizations Code (TXBOC), Entergy Arkansas will allocate substantially all of its assets to a new subsidiary, Entergy Arkansas Power, LLC, a Texas limited liability company (Entergy Arkansas Power), and Entergy Arkansas Power will assume substantially all of the liabilities of Entergy Arkansas, in a transaction regarded as a merger under the TXBOC. Entergy Arkansas will remain in existence and hold the membership interests in Entergy Arkansas Power.
Entergy Arkansas will contribute the membership interests in Entergy Arkansas Power to an affiliate (Entergy Utility Holding Company, LLC, a Texas limited liability company and subsidiary of Entergy Corporation). As a result of the contribution, Entergy Arkansas Power will be a wholly-owned subsidiary of Entergy Utility Holding Company, LLC.
Entergy Arkansas will change its name to Entergy Utility Property, Inc., and Entergy Arkansas Power will then change its name to Entergy Arkansas, LLC.

Upon the completion of the restructuring, Entergy Arkansas, LLC will hold substantially all of the assets, and will have assumed substantially all of the liabilities, of Entergy Arkansas. Entergy Arkansas may modify or supplement the steps to be taken to effectuate the restructuring.
Filings with the LPSC (Entergy Louisiana)

Retail Rates - Electric

2014 Formula Rate Plan Filing

In connection with the approval of the business combination of Entergy Gulf States Louisiana and Entergy Louisiana, the LPSC authorized the filing of a single, joint, formula rate plan evaluation report for Entergy Gulf States Louisiana’s and Entergy Louisiana’s 2014 calendar year operations. The joint evaluation report was filed in September 2015 and reflected an earned return on common equity of 9.09%. As such, no adjustment to base formula rate plan revenue was required. The following adjustments were required under the formula rate plan, however: a decrease in the additional capacity mechanism for Entergy Louisiana of $17.8 million; an increase in the additional capacity mechanism for Entergy Gulf States Louisiana of $4.3 million; and a reduction of $5.5 million to the MISO cost recovery mechanism to collect approximately $35.7 million on a combined-company basis. Under the order approving the business combination, following completion of the prescribed review period, rates were implemented with the first billing cycle of December 2015, subject to refund. See “Entergy Louisiana and Entergy Gulf States Louisiana Business Combination” below for further discussion of the business combination. In June 2017 the LPSC staff and Entergy Louisiana filed an unopposed joint report of proceedings, which was accepted by the LPSC in June 2017, finalizing the results of this proceeding with no changes to rates already implemented.

2015 Formula Rate Plan Filing

In May 2016, Entergy Louisiana filed its formula rate plan evaluation report for its 2015 calendar year operations. The evaluation report reflected an earned return on common equity of 9.07%. As such, no adjustment to base formula rate plan revenue was required. The following other adjustments, however, were required under the formula rate plan: an increase in the legacy Entergy Louisiana additional capacity mechanism of $14.2 million; a separate increase in legacy Entergy Louisiana revenue of $10 million primarily to reflect the effects of the termination of the System Agreement; an increase in the legacy Entergy Gulf States Louisiana additional capacity mechanism of $0.5 million; a decrease in legacy Entergy Gulf States Louisiana revenue of $58.7 million primarily to reflect the effects of the termination of the System Agreement; and an increase of $11 million to the MISO cost recovery mechanism. Rates were implemented with the first billing cycle of September 2016, subject to refund. Following implementation of the as-filed rates in September 2016, there were several interim updates to Entergy Louisiana’s formula rate plan, including the one submitted in December 2016, reflecting implementation of the settlement of the Waterford 3 replacement steam generator project prudence review described below. In June 2017 the LPSC staff and Entergy Louisiana filed a joint report of proceedings, which was accepted by the LPSC in June 2017, finalizing the results of the May 2016 evaluation report, interim updates, and corresponding proceedings with no changes to rates already implemented.

Extension of MISO Cost Recovery Mechanism Rider

In November 2016, Entergy Louisiana filed with the LPSC a request to extend the MISO cost recovery mechanism rider provision of its formula rate plan. In March 2017 the LPSC staff submitted direct testimony generally supportive of a one-year extension of the MISO cost recovery mechanism and the intervenor in the proceeding did not oppose an extension for this period of time. In July 2017 an uncontested joint stipulation authorizing a one-year extension of the MISO cost recovery mechanism rider was approved.

2016 Formula Rate Plan Filing

In May 2017, Entergy Louisiana filed its formula rate plan evaluation report for its 2016 calendar year operations. The evaluation report reflected an earned return on common equity of 9.84%. As such, no adjustment to base formula rate plan revenue was required. Adjustments, however, were required under the formula rate plan; the 2016 formula rate plan evaluation report showed a decrease in formula rate plan revenue of approximately $16.9 million, comprised of a decrease in legacy Entergy Louisiana formula rate plan revenue of $3.5 million, a decrease in legacy Entergy Gulf States Louisiana formula rate plan revenue of $9.7 million, and a decrease in incremental formula rate plan revenue of $3.7 million. Additionally, the formula rate plan evaluation report called for a decrease of $40.5 million in the MISO cost recovery revenue requirement from the present level of $46.8 million to $6.3 million. Rates reflecting these adjustments were implemented with the first billing cycle of September 2017, subject to refund. In September 2017 the LPSC issued its report indicating that no changes to Entergy Louisiana’s original formula rate plan evaluation report were required but reserved for several issues, including Entergy Louisiana’s September 2017 update to its formula rate plan evaluation report.

Formula Rate Plan Extension Request

In August 2017, Entergy Louisiana filed a request with the LPSC seeking to extend its formula rate plan for three years (2017-2019) with limited modifications to its terms.  Those modifications include: a one-time resetting of base rates to the midpoint of the band at Entergy Louisiana’s authorized return on equity of 9.95% for the 2017 test year; narrowing of the formula rate plan bandwidth from a total of 160 basis points to 80 basis points; and a forward-looking mechanism that would allow Entergy Louisiana to recover certain transmission-related costs contemporaneously with when those projects begin delivering benefits to customers.  Entergy Louisiana requested that the LPSC consider its request on an expedited basis, in an effort to maintain Entergy Louisiana’s current cycle for implementing rate adjustments, i.e., September 2018, without the need for filing a full base rate case proceeding. Several parties have intervened in the proceeding and all parties have been participating in settlement discussions.

Waterford 3 Replacement Steam Generator Project

Following the completion of the Waterford 3 replacement steam generator project, the LPSC undertook a prudence review in connection with a filing made by Entergy Louisiana in April 2013 with regard to the following aspects of the replacement project: 1) project management; 2) cost controls; 3) success in achieving stated objectives; 4) the costs of the replacement project; and 5) the outage length and replacement power costs. In July 2014 the LPSC staff filed testimony recommending potential project and replacement power cost disallowances of up to $71 million, citing a need for further explanation or documentation from Entergy Louisiana.  An intervenor filed testimony recommending disallowance of $141 million of incremental project costs, claiming the steam generator fabricator was imprudent.  Entergy Louisiana provided further documentation and explanation requested by the LPSC staff. An evidentiary hearing was held in December 2014. At the hearing the parties maintained the positions reflected in pre-filed testimony. Entergy Louisiana believed that the replacement steam generator costs were prudently incurred and applicable legal principles supported their recovery in rates.  Nevertheless, Entergy Louisiana recorded a write-off of $16 million of Waterford 3’s plant balance in December 2014 because of the uncertainty at the time associated with the resolution of the prudence review. In December 2015 the ALJ issued a proposed recommendation, which was subsequently finalized, concluding that Entergy Louisiana prudently managed the Waterford 3 replacement steam generator project, including the selection, use, and oversight of contractors, and could not reasonably have anticipated the damage to the steam generators. Nevertheless, the ALJ concluded that Entergy Louisiana was liable for the conduct of its contractor and subcontractor and, therefore, recommended a disallowance of $67 million in capital costs. Additionally, the ALJ concluded that Entergy Louisiana did not sufficiently justify the incurrence of $2 million in replacement power costs during the replacement outage. Although the ALJ’s recommendation had not yet been considered by the LPSC, after considering the progress of the proceeding in light of the ALJ recommendation, Entergy Louisiana recorded in the fourth quarter 2015 approximately $77 million in charges, including a $45 million asset write-off and a $32 million regulatory charge, to reflect that a portion of the assets associated with the Waterford 3 replacement steam generator project was no longer probable of recovery. Entergy Louisiana maintained that the ALJ’s recommendation contained significant factual and legal errors.

In October 2016 the parties reached a settlement in this matter. The settlement was approved by the LPSC in December 2016. The settlement effectively provided for an agreed-upon disallowance of $67 million of plant, which had been previously written off by Entergy Louisiana, as discussed above. The refund to customers of approximately $71 million as a result of the settlement approved by the LPSC was made to customers in January 2017. Of the $71 million of refunds, $68 million was credited to customers through Entergy Louisiana’s formula rate plan, outside of sharing, and $3 million through its fuel adjustment clause. Entergy Louisiana had previously recorded a provision of $48 million for this refund. The previously-recorded provision included the cumulative revenues recorded through December 2016 related to the $67 million of disallowed plant. An additional regulatory charge of $23 million was recorded in fourth quarter 2016 to reflect the effects of the settlement. The settlement also provided that Entergy Louisiana could retain the value associated with potential service credits agreed to by the project contractor, to the extent they are realized in the future. Following a review by the parties, an unopposed joint report of proceedings was filed by the LPSC staff and Entergy Louisiana in May 2017 and the LPSC accepted the joint report of proceedings resolving the matter.

Ninemile 6

In July 2014, Entergy Gulf States Louisiana and Entergy Louisiana filed an unopposed stipulation with the LPSC, which was subsequently approved, that estimated a first year revenue requirement associated with Ninemile 6 and provided a mechanism to update the revenue requirement as the in-service date approached. In late-December 2014, roughly contemporaneous with the unit's placement in service, a final updated estimated revenue requirement of $26.8 million for Entergy Gulf States Louisiana and $51.1 million for Entergy Louisiana was filed. The December 2014 estimate formed the basis of rates implemented effective with the first billing cycle of January 2015. In July 2015, Entergy Louisiana submitted to the LPSC a compliance filing including an estimate at completion, inclusive of interconnection costs and transmission upgrades, of approximately $648 million, or $76 million less than originally estimated, along with other project details and supporting evidence, to enable the LPSC to review the prudence of Entergy Louisiana’s management of the project. Testimony filed by the LPSC staff generally supported the prudence of the management of the project and recovery of the costs incurred to complete the project. The LPSC staff had questioned the warranty coverage for one element of the project. In October 2016 all parties agreed to a stipulation providing that 100% of Ninemile 6 construction costs was prudently incurred and is eligible for recovery from customers, but reserving the LPSC’s rights to review the prudence of Entergy Louisiana’s actions regarding one element of the project. This stipulation was approved by the LPSC in January 2017.

Union Power Station and Deactivation or Retirement Decisions for Entergy Louisiana Plants

In January 2015, Entergy Gulf States Louisiana filed its application with the LPSC for approval of the acquisition and cost recovery of two power blocks of the Union Power Station for an expected base purchase price of approximately $237 million per power block, subject to adjustments. In September 2015, Entergy Gulf States Louisiana agreed to settlement terms with all parties for Entergy Gulf States Louisiana’s purchase of the two power blocks. In October 2015 the LPSC voted unanimously to approve the uncontested settlement which finds, among other things, that acquisition of Power Blocks 3 and 4 is in the public interest and, therefore, prudent. The business combination of Entergy Gulf States Louisiana and Entergy Louisiana received regulatory approval and closed in October 2015 making Entergy Louisiana the named purchaser of Power Blocks 3 and 4 of the Union Power Station. In March 2016, Entergy Louisiana acquired Power Blocks 3 and 4 of Union Power Station for an aggregate purchase price of approximately $474 million and implemented rates to collect the estimated first-year revenue requirement with the first billing cycle of March 2016.

As a term of the LPSC-approved settlement authorizing the purchase of Power Blocks 3 and 4 of the Union Power Station, Entergy Louisiana agreed to make a filing with the LPSC to review its decisions to deactivate Ninemile 3 and Willow Glen 2 and 4 and its decision to retire Little Gypsy 1.  In January 2016, Entergy Louisiana made its compliance filing with the LPSC. Entergy Louisiana, LPSC staff, and intervenors participated in a technical conference in March 2016 where Entergy Louisiana presented information on its deactivation/retirement decisions for these four units in addition to information on the current deactivation decisions for the ten-year planning horizon. Parties have requested further proceedings on the prudence of the decision to deactivate Willow Glen 2 and 4.  No party contests the prudence of the decision to deactivate Willow Glen 2 and 4 or suggests reactivation of these units; however, issues have been raised related to Entergy Louisiana’s decision to give up its transmission service rights in MISO for Willow Glen 2 and 4 rather than placing the units into suspended status for the three-year term permitted by MISO. An evidentiary hearing was held in August 2017 and post-hearing briefs were submitted in October 2017. A decision is expected in 2018.

Retail Rates - Gas 

In accordance with the settlement of Entergy Gulf States Louisiana’s gas rate stabilization plan for the test year ended September 30, 2012, in August 2014, Entergy Gulf States Louisiana submitted for consideration a proposal for implementation of an infrastructure rider to recover expenditures associated with strategic plant investment and relocation projects mandated by local governments. After review by the LPSC staff and inclusion of certain customer safeguards required by the LPSC staff, in December 2014, Entergy Gulf States Louisiana and the LPSC staff submitted a joint settlement for implementation of an accelerated gas pipe replacement program providing for the replacement of approximately 100 miles of pipe over the next ten years, as well as relocation of certain existing pipe resulting from local government-related infrastructure projects, and for a rider to recover the investment associated with these projects. The rider allows for recovery of approximately $65 million over ten years. The rider recovery will be adjusted on a quarterly basis to include actual investment incurred for the prior quarter and is subject to the following conditions, among others: a ten-year term; application of any earnings in excess of 10.45% as an offset to the revenue requirement of the infrastructure rider; adherence to a specified spending plan, within plus or minus 20% annually; annual filings comparing actual versus planned rider spending with actual spending and explanation of variances exceeding 10%; and an annual true-up. The joint settlement was approved by the LPSC in January 2015. Implementation of the infrastructure rider commenced with bills rendered on and after the first billing cycle of April 2015.

2014 Rate Stabilization Plan Filing

In January 2015, Entergy Gulf States Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2014.  The filing showed an earned return on common equity of 7.20%, which resulted in a $706 thousand rate increase.  In April 2015 the LPSC issued findings recommending two adjustments to Entergy Gulf States Louisiana’s as-filed results, and an additional recommendation that did not affect the results. The LPSC staff’s recommended adjustments increase the earned return on equity for the test year to 7.24%. Entergy Gulf States Louisiana accepted the LPSC staff’s recommendations and a revenue increase of $688 thousand was implemented with the first billing cycle of May 2015.

2015 Rate Stabilization Plan Filing

In January 2016, Entergy Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2015. The filing showed an earned return on common equity of 10.22%, which is within the authorized bandwidth, therefore requiring no change in rates. In March 2016 the LPSC staff issued its report stating that the 2015 gas rate stabilization plan filing was in compliance with the exception of several issues that required additional information, explanation, or clarification for which the LPSC staff had reserved the right to further review. In July 2016 the parties to the proceeding filed an unopposed joint report and motion for entry of order accepting the report that indicated no outstanding issues remained in the filing.

In February 2016, Entergy Louisiana filed a motion requesting to extend the term of the gas rate stabilization plan in substantially similar form for an additional three-year term and included a request for sharing of non-jurisdictional compressed natural gas revenues. Following discovery and the filing of testimony by the LPSC staff, Entergy Louisiana and the LPSC submitted a joint motion for hearing an uncontested stipulated settlement resolving the proceeding. A hearing on the stipulation was held in November 2016. The ALJ issued a report of proceedings that was presented with the parties’ stipulation to the LPSC for consideration. The stipulation approving Entergy Louisiana’s requested extension of the rate stabilization plan was approved by the LPSC in December 2016.

2016 Rate Stabilization Plan Filing

In January 2017, Entergy Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2016. The filing of the evaluation report for test year 2016 reflected an earned return on common equity of 6.37%. As part of the original filing, pursuant to the extraordinary cost provision of the rate stabilization plan, Entergy Louisiana sought to recover approximately $1.5 million in deferred operation and maintenance expenses incurred to restore service and repair damage resulting from flooding and widespread rainfall in southeast Louisiana that occurred in August 2016. Entergy Louisiana requested to recover the prudently incurred August 2016 storm restoration costs over ten years, outside of the rate stabilization plan sharing provisions. As a result, Entergy Louisiana’s filing sought an annual increase in revenue of $1.4 million. Following review of the filing, except for the proposed extraordinary cost recovery, the LPSC staff confirmed Entergy Louisiana’s filing was consistent with the principles and requirements of the rate stabilization plan. The extraordinary cost recovery request associated with the 2016 flood-related deferred operation and maintenance expenses incurred for gas operations was removed from the rate stabilization plan pending LPSC consideration in a separate docket. In April 2017 the LPSC approved a joint report of proceedings and Entergy Louisiana submitted a revised evaluation report reflecting a $1.2 million annual increase in revenue with rates implemented with the first billing cycle of May 2017.

In connection with the joint report of proceedings accepted by the LPSC, in May 2017, Entergy Louisiana filed an application to initiate a separate proceeding to recover through the extraordinary cost provision of the gas rate stabilization plan the deferred operation and maintenance expenses of $1.4 million incurred to restore service and repair damage resulting from flooding and widespread rainfall in southeast Louisiana that occurred in August 2016. The LPSC staff submitted its direct testimony in the proceeding recommending recovery of $0.9 million. Entergy Louisiana filed rebuttal testimony responding to the LPSC staff’s recommendation. The procedural schedule was suspended to allow the parties to engage in settlement negotiations, and in February 2018 the LPSC staff and Entergy Louisiana filed an unopposed settlement. If approved by the LPSC, the settlement would provide for Entergy Louisiana to recover, over ten years, the approximately $1.4 million in deferred operation and maintenance expense and related carrying charges. The settlement further provides for recovery to commence in May 2018.

2017 Rate Stabilization Plan Filing

In January 2018, Entergy Louisiana filed with the LPSC its gas rate stabilization plan for test year ended September 30, 2017.  The filing of the evaluation report for the test year 2017 reflected an earned return on common equity of 9.06%.  This earned return is below the earnings sharing band of the rate stabilization plan and results in a rate increase of $0.1 million.  Due to the enactment in late-December 2017 of the Tax Cuts and Jobs Act, Entergy Louisiana did not have adequate time to reflect the effects of this tax legislation in the rate stabilization plan.  As a result, Entergy Louisiana will file a supplement to the January 2018 evaluation report to reflect, among other things, a 21% federal corporate income tax rate.  Any rate change resulting from the revised rate stabilization plan will become effective in rates in May 2018.

Filings with the MPSC (Entergy Mississippi)

Formula Rate Plan Filings

In March 2016, Entergy Mississippi submitted its formula rate plan 2016 test year filing showing Entergy Mississippi’s projected earned return for the 2016 calendar year to be below the formula rate plan bandwidth. The filing showed a $32.6 million rate increase was necessary to reset Entergy Mississippi’s earned return on common equity to the specified point of adjustment of 9.96%, within the formula rate plan bandwidth. In June 2016 the MPSC approved Entergy Mississippi’s joint stipulation with the Mississippi Public Utilities Staff. The joint stipulation provided for a total revenue increase of $23.7 million. The revenue increase includes a $19.4 million increase through the formula rate plan, resulting in a return on common equity point of adjustment of 10.07%. The revenue increase also includes $4.3 million in incremental ad valorem tax expenses to be collected through an updated ad valorem tax adjustment rider. The revenue increase and ad valorem tax adjustment rider were effective with the July 2016 bills.

In March 2017, Entergy Mississippi submitted its formula rate plan 2017 test year filing and 2016 look-back filing showing Entergy Mississippi’s earned return for the historical 2016 calendar year and projected earned return for the 2017 calendar year to be within the formula rate plan bandwidth, resulting in no change in rates. In June 2017, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a stipulation that confirmed that Entergy Mississippi’s earned returns for both the 2016 look-back filing and 2017 test year were within the respective formula rate plan bandwidths. In June 2017 the MPSC approved the stipulation, which resulted in no change in rates.

Filings with the City Council (Entergy New Orleans)

Retail Rates

See “Algiers Asset Transfer” below for discussion of the Algiers asset transfer. As a provision of the settlement agreement approved by the City Council in May 2015 providing for the Algiers asset transfer, it was agreed that, with limited exceptions, no action may be taken with respect to Entergy New Orleans’s base rates until rates are implemented from a base rate case that must be filed for its electric and gas operations in 2018. This provision eliminated the formula rate plan applicable to Algiers operations. The limited exceptions included continued implementation of the then-remaining two years of the four-year phased-in rate increase for the Algiers area and certain exceptional cost increases or decreases in the base revenue requirement. An additional provision of the settlement agreement allowed for continued recovery of the revenue requirement associated with the capacity and energy from Ninemile 6 received by Entergy New Orleans under a power purchase agreement with Entergy Louisiana (Algiers PPA). The settlement authorized Entergy New Orleans to recover the remaining revenue requirement related to the Algiers PPA through base rates charged to Algiers customers. The settlement also provided for continued implementation of the Algiers MISO recovery rider.

In addition to the Algiers PPA, Entergy New Orleans has a separate power purchase agreement with Entergy Louisiana for 20% of the capacity and energy from Ninemile 6 (Ninemile PPA), which commenced operation in December 2014. Initially, recovery of the non-fuel costs associated with the Ninemile PPA was authorized through a special Ninemile 6 rider billed only to Entergy New Orleans customers outside of Algiers.

In August 2015, Entergy New Orleans filed an application with the City Council seeking authorization to proceed with the purchase of Union Power Block 1, with an expected base purchase price of approximately $237 million, subject to adjustments, and seeking approval of the recovery of the associated costs. In November 2015 the City Council issued written resolutions and an order approving an agreement in principle between Entergy New Orleans and City Council advisors providing that the purchase of Union Power Block 1 and related assets by Entergy New Orleans is prudent and in the public interest. The City Council authorized expansion of the terms of the purchased power and capacity acquisition cost recovery rider to recover the non-fuel purchased power expense from Ninemile 6, the revenue requirement associated with the purchase of Power Block 1 of the Union Power Station, and a credit to customers of $400 thousand monthly beginning June 2016 in recognition of the decrease in other operation and maintenance expenses that would result with the deactivation of Michoud Units 2 and 3. In March 2016, Entergy New Orleans purchased Power Block 1 of the Union Power Station for approximately $237 million and initiated recovery of these costs with March 2016 bills. In July 2016, Entergy New Orleans and the City Council Utility Committee agreed to a temporary increase in the Michoud credit to customers to a total of $1.4 million monthly for August 2016 through December 2016.

A 2008 rate case settlement included $3.1 million per year in electric rates to fund the Energy Smart energy efficiency programs.  The rate settlement provided an incentive for Entergy New Orleans to meet or exceed energy savings targets set by the City Council and provided a mechanism for Entergy New Orleans to recover lost contribution to fixed costs associated with the energy savings generated from the energy efficiency programs. In January 2015 the City Council approved funding for the Energy Smart program from April 2015 through March 2017 using the remainder of the approximately $12.8 million of 2014 rough production cost equalization funds, with any remaining costs being recovered through the fuel adjustment clause. This funding methodology was modified in November 2015 when the City Council directed Entergy New Orleans to use a combination of guaranteed customer savings related to a prior agreement with the City Council and rough production cost equalization funds to cover program costs prior to recovering any costs through the fuel adjustment clause. In April 2017 the City Council approved an implementation plan for the Energy Smart program from April 2017 through December 2019. The City Council directed that the $11.8 million balance reported for Energy Smart funds be used to continue funding the program for Entergy New Orleans’s legacy customers and that the Energy Smart Algiers program continue to be funded through the Algiers fuel adjustment clause, until additional customer funding is required for the legacy customers. In September 2017, Entergy New Orleans filed a supplemental plan and proposed several options for an interim cost recovery mechanism necessary to recover program costs during the period between when existing funds directed to Energy Smart programs are depleted (estimated to be June 2018) and when new rates from the anticipated 2018 combined rate case, which will include a cost recovery mechanism for Energy Smart funding, take effect (estimated to be August 2019). Entergy New Orleans requested that the City Council approve a cost recovery mechanism prior to June 2018. In December 2017 the City Council approved an energy efficiency cost recovery rider as an interim funding mechanism for Energy Smart, subject to verification that no additional funding sources exist.

Internal Restructuring

In July 2016, Entergy New Orleans filed an application with the City Council seeking authorization to undertake a restructuring that would result in the transfer of substantially all of the assets and operations of Entergy New Orleans, Inc. to a new entity, which would ultimately be owned by an existing Entergy subsidiary holding company. The restructuring was subject to regulatory review and approval by the City Council and the FERC. In May 2017 the City Council adopted a resolution approving the proposed internal restructuring pursuant to an agreement in principle with the City Council advisors and certain intervenors. Pursuant to the agreement in principle, Entergy New Orleans would credit retail customers $10 million in 2017, $1.4 million in the first quarter of the year after the transaction closes, and $117,500 each month in the second year after the transaction closes until such time as new base rates go into effect as a result of the anticipated 2018 base rate case. Entergy New Orleans began crediting retail customers in June 2017. In June 2017 the FERC approved the transaction and, pursuant to the agreement in principle, Entergy New Orleans will provide additional credits to retail customers of $5 million in each of the years 2018, 2019, and 2020.

In November 2017, pursuant to the agreement in principle, Entergy New Orleans undertook a multi-step restructuring, including the following:

Entergy New Orleans, Inc. redeemed its outstanding preferred stock at a price of approximately $21 million, which included a call premium of approximately $819,000, plus any accumulated and unpaid dividends.
Entergy New Orleans, Inc. converted from a Louisiana corporation to a Texas corporation.
Under the Texas Business Organizations Code (TXBOC), Entergy New Orleans, Inc. allocated substantially all of its assets to a new subsidiary, Entergy New Orleans Power, LLC, a Texas limited liability company (Entergy New Orleans Power), and Entergy New Orleans Power assumed substantially all of the liabilities of Entergy New Orleans, Inc., in a transaction regarded as a merger under the TXBOC. Entergy New Orleans, Inc. remained in existence and held the membership interests in Entergy New Orleans Power.
Entergy New Orleans, Inc. contributed the membership interests in Entergy New Orleans Power to an affiliate (Entergy Utility Holding Company, LLC, a Texas limited liability company and subsidiary of Entergy Corporation). As a result of the contribution, Entergy New Orleans Power is a wholly-owned subsidiary of Entergy Utility Holding Company, LLC.

In December 2017, Entergy New Orleans, Inc. changed its name to Entergy Utility Group, Inc., and Entergy New Orleans Power then changed its name to Entergy New Orleans, LLC. Entergy New Orleans, LLC holds substantially all of the assets, and has assumed substantially all of the liabilities, of Entergy New Orleans, Inc. The restructuring was accounted for as a transaction between entities under common control.

Filings with the PUCT and Texas Cities (Entergy Texas)

Retail Rates

2011 Rate Case

In November 2011, Entergy Texas filed a rate case requesting a $112 million base rate increase reflecting a 10.6% return on common equity based on an adjusted June 2011 test year.  The rate case also proposed a purchased power recovery rider.  On January 12, 2012, the PUCT voted not to address the purchased power recovery rider in the rate case, but the PUCT voted to set a baseline in the rate case proceeding that would be applicable if a purchased power capacity rider is approved in a separate proceeding.  In April 2012 the PUCT Staff filed direct testimony recommending a base rate increase of $66 million and a 9.6% return on common equity.  The PUCT Staff, however, subsequently filed a statement of position in the proceeding indicating that it was still evaluating the position it would ultimately take in the case regarding Entergy Texas’s recovery of purchased power capacity costs and Entergy Texas’s proposal to defer its MISO transition expenses.  In April 2012, Entergy Texas filed rebuttal testimony indicating a revised request for a $105 million base rate increase.  A hearing was held in late-April through early-May 2012.

In September 2012 the PUCT issued an order approving a $28 million rate increase, effective July 2012.  The order included a finding that “a return on common equity (ROE) of 9.80 percent will allow [Entergy Texas] a reasonable opportunity to earn a reasonable return on invested capital.”  The order also provided for increases in depreciation rates and the annual storm reserve accrual.  The order also reduced Entergy Texas’s proposed purchased power capacity costs, stating that they are not known and measurable; reduced Entergy Texas’s regulatory assets associated with Hurricane Rita; excluded from rate recovery capitalized financially-based incentive compensation; included $1.6 million of MISO transition expense in base rates; and reduced Entergy’s Texas’s fuel reconciliation recovery by $4 million because the PUCT disagreed with the line-loss factor used in the calculation.  After considering the progress of the proceeding in light of the PUCT order, Entergy Texas recorded in the third quarter 2012 an approximate $24 million charge to recognize that assets associated with Hurricane Rita, financially-based incentive compensation, and fuel recovery are no longer probable of recovery.  Entergy Texas believed that it was entitled to recover these prudently incurred costs, however, and it filed a motion for rehearing regarding these and several other issues in the PUCT’s order on October 4, 2012.  Several other parties also filed motions for rehearing of the PUCT’s order.  The PUCT subsequently denied rehearing of substantive issues.  Several parties, including Entergy Texas, appealed various aspects of the PUCT’s order to the Travis County District Court. A hearing was held in July 2014. In October 2014 the Travis County District Court issued an order upholding the PUCT’s decision except as to the line-loss factor issue referenced above, which was found in favor of Entergy Texas. In November 2014, Entergy Texas and other parties, including the PUCT, appealed the Travis County District Court decision to the Third Court of Appeals. Oral argument before the court panel was held in September 2015. In April 2016 the Third Court of Appeals issued its opinion affirming the District Court’s decision on all points. Entergy Texas petitioned the Texas Supreme Court to hear its appeal of the Third Court’s ruling. In September 2017 the Texas Supreme Court denied the petitions for review. Entergy Texas filed a motion for rehearing of the Texas Supreme Court’s denial of the petition for review. In January 2018 the Texas Supreme Court denied Entergy Texas’s motion for rehearing.

Distribution cost recovery factor (DCRF) rider

In September 2015, Entergy Texas filed to amend its DCRF rider. Entergy Texas requested an increase in recovery under the rider of $6.5 million, for a total collection of $10.1 million annually from retail customers. In October 2015 intervenors and PUCT staff filed testimony opposing, in part, Entergy Texas’s request. In November 2015, Entergy Texas and the parties filed an unopposed settlement agreement and supporting documents. The settlement established an annual revenue requirement of $8.65 million for the amended DCRF rider, with the resulting rates effective for usage on and after January 1, 2016. The PUCT approved the settlement agreement in February 2016.

In June 2017, Entergy Texas filed an application to amend its DCRF rider by increasing the total collection from $8.65 million to approximately $19 million. In July 2017, Entergy Texas, the PUCT, and the two other parties in the proceeding entered into an unopposed stipulation and settlement agreement resulting in an amended DCRF annual revenue requirement of $18.3 million, with the resulting rates effective for usage no later than October 1, 2017. In September 2017 the PUCT issued its final order approving the unopposed stipulation and settlement agreement. The amended DCRF rider rates became effective for usage on and after September 1, 2017.
    
Transmission cost recovery factor (TCRF) rider

In September 2015, Entergy Texas filed for a TCRF rider requesting a $13 million increase, incremental to base rates. Testimony was filed in November 2015, with the PUCT staff and other parties proposing various disallowances involving, among other things, MISO charges, vegetation management costs, and bad debt expenses that would reduce the requested increase by approximately $2 million. In addition to those recommended disallowances, a number of parties recommended that Entergy Texas’s request be reduced by an additional $3.4 million to account for load growth since base rates were last set. A hearing on the merits was held in December 2015. In February 2016 a State Office of Administrative Hearings ALJ issued a proposal for decision recommending that the PUCT disallow approximately $2 million from Entergy Texas’s $13 million request, but recommending that the PUCT not accept the load growth offset. In June 2016 the PUCT indicated that it would take up in a future rulemaking project the issue of whether a load growth adjustment should apply to a TCRF. In July 2016 the PUCT issued an order generally accepting the proposal for decision but declining to adjust the TCRF baseline in two instances as recommended by the ALJ, which resulted in a total annual allowance of approximately $10.5 million. The PUCT also ordered its staff and Entergy Texas to track all spare autotransformer transfers going forward so that it could address the appropriate accounting treatment and prudence of such transfers in Entergy Texas’s next base rate case. Entergy Texas implemented the TCRF rider beginning with September 2016 bills.

In September 2016, Entergy Texas filed with the PUCT a request to amend its TCRF rider. The proposed amended TCRF rider is designed to collect approximately $29.5 million annually from Entergy Texas’s retail customers. This amount includes the approximately $10.5 million annually that Entergy Texas is currently authorized to collect through the TCRF rider, as discussed above. In December 2016, concurrent with the 2016 fuel reconciliation stipulation and settlement agreement discussed above, Entergy Texas and the PUCT reached a settlement agreeing to the amended TCRF annual revenue requirement of $29.5 million. As discussed above, the terms of the two settlements are interdependent. The PUCT approved the settlement and issued a final order in March 2017. Entergy Texas implemented the amended TCRF rider beginning with bills covering usage on and after March 20, 2017.

Advanced Metering Infrastructure (AMI) Filings

Entergy Arkansas

In September 2016, Entergy Arkansas filed an application seeking a finding from the APSC that Entergy Arkansas’s deployment of AMI is in the public interest. Entergy Arkansas proposed to replace existing meters with advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems. AMI is intended to serve as the foundation of Entergy Arkansas’s modernized power grid. The filing included an estimate of implementation costs for AMI of $208 million. The filing identified a number of quantified and unquantified benefits, and Entergy Arkansas provided a cost benefit analysis showing that its AMI deployment is expected to produce a nominal net benefit to customers of $406 million. Entergy Arkansas also sought to continue to include in rate base the remaining book value of existing meters, which was approximately $57 million at December 31, 2015, that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates. Entergy Arkansas proposed a 15-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019. Deployment of the communications network is expected to begin in 2018. Entergy Arkansas proposed to include the AMI deployment costs and the quantified benefits in future formula rate plan filings, and the 2018 costs were approved in the 2017 formula rate plan filing. In June 2017 the APSC staff and Arkansas Attorney General filed direct testimony. The APSC staff generally supported Entergy Arkansas’s AMI deployment conditioned on various recommendations. The Arkansas Attorney General’s consultant primarily recommended denial of Entergy Arkansas’s application but alternatively suggested recommendations in the event the APSC approves Entergy Arkansas’s proposal. Entergy Arkansas filed rebuttal testimony in June 2017, substantially accepting the APSC staff’s recommendations. In August 2017, Entergy Arkansas and the parties to the proceeding filed a joint motion to approve a unanimous settlement agreement. In October 2017 the APSC issued an order finding that Entergy Arkansas’s AMI deployment is in the public interest and approving the settlement agreement subject to a minor modification. Entergy Arkansas expects to recover the undepreciated balance of its existing meters through a regulatory asset to be amortized over 15 years. Entergy Arkansas has begun discussions with the other parties to implement the items in the settlement agreement including pre-pay and time of use programs.

Entergy Louisiana

In November 2016, Entergy Louisiana filed an application seeking a finding from the LPSC that Entergy Louisiana’s deployment of advanced electric and gas metering infrastructure is in the public interest. Entergy Louisiana proposed to deploy advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems. AMI is intended to serve as the foundation of Entergy Louisiana’s modernized power grid. The filing included an estimate of implementation costs for AMI of $330 million. The filing identified a number of quantified and unquantified benefits, and Entergy Louisiana provided a cost/benefit analysis showing that its combined electric and gas AMI deployment is expected to produce a nominal net benefit to customers of $607 million. Entergy Louisiana also sought to continue to include in rate base the remaining book value, approximately $92 million at December 31, 2015, of the existing electric meters and also to depreciate those assets using current depreciation rates. Entergy Louisiana proposed a 15-year useful life for the new advanced meters, the three-year deployment of which is expected to begin in 2019. The communications network deployment is expected to begin by late-2018, after the necessary information technology infrastructure is in place. Entergy Louisiana proposed to recover the cost of AMI through the implementation of a customer charge, net of certain benefits, phased in over the period 2019 through 2022. The parties reached an uncontested stipulation permitting implementation of Entergy Louisiana’s proposed AMI system, with modifications to the proposed customer charge. In July 2017 the LPSC approved the stipulation. Entergy Louisiana expects to recover the undepreciated balance of its existing meters through a regulatory asset to be amortized at current depreciation rates.

Entergy Mississippi

In November 2016, Entergy Mississippi filed an application seeking an order from the MPSC granting a certificate of public convenience and necessity and finding that Entergy Mississippi’s deployment of AMI is in the public interest. Entergy Mississippi proposed to replace existing meters with advanced meters that enable two-way data communication; to design and build a secure and reliable network to support such communications; and to implement support systems. AMI is intended to serve as the foundation of Entergy Mississippi’s modernized power grid. The filing included an estimate of implementation costs for AMI of $132 million. The filing identified a number of quantified and unquantified benefits, and Entergy Mississippi provided a cost benefit analysis showing that its AMI deployment is expected to produce a nominal benefit to customers of $496 million over a 15-year period, which when netted against the costs of AMI results in $183 million of net customer benefits. Entergy Mississippi also sought to continue to include in rate base the remaining book value, approximately $56 million at December 31, 2015, of existing meters that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates. Entergy Mississippi proposed a 15-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019, subject to approval by the MPSC, with deployment of the communications network expected to begin in 2018. Entergy Mississippi proposed to include the AMI deployment costs and the quantified benefits in existing rate mechanisms, primarily through future formula rate plan filings and/or future energy cost recovery rider schedule re-determinations, as applicable. In May 2017 the Mississippi Public Utilities Staff and Entergy Mississippi entered into and filed a joint stipulation supporting Entergy Mississippi’s filing, and the MPSC issued an order approving the filing without material changes, finding that Entergy Mississippi’s deployment of AMI is in the public interest and granting a certificate of public convenience and necessity. The MPSC order also confirmed that Entergy Mississippi shall continue to include in rate base the remaining book value of existing meters that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates.

Entergy New Orleans

In October 2016, Entergy New Orleans filed an application seeking a finding from the City Council that Entergy New Orleans’s deployment of advanced electric and gas metering infrastructure is in the public interest.  Entergy New Orleans proposed to deploy advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems.  AMI is intended to serve as the foundation of Entergy New Orleans’s modernized power grid.  The filing included an estimate of implementation costs for AMI of $75 million. The filing identified a number of quantified and unquantified benefits, and Entergy New Orleans provided a cost/benefit analysis showing that its combined electric and gas AMI deployment is expected to produce a nominal net benefit to customers of $101 million.  Entergy New Orleans also sought to continue to include in rate base the remaining book value, approximately $21 million at December 31, 2015, of the existing electric meters and also to depreciate those assets using current depreciation rates.  Entergy New Orleans proposed a 15-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019.  Deployment of the information technology infrastructure began in 2017 and deployment of the communications network is expected to begin in 2018.  Entergy New Orleans proposed to recover the cost of AMI through the implementation of a customer charge, net of certain benefits, phased in over the period 2019 through 2022.  The City Council’s advisors filed testimony in May 2017 recommending the adoption of AMI subject to certain modifications, including the denial of Entergy New Orleans’s proposed customer charge as a cost recovery mechanism. In January 2018 a settlement was reached between the City Council’s advisors and Entergy New Orleans. In February 2018 the City Council approved the settlement, which deferred cost recovery to the 2018 Entergy New Orleans rate case, but also stated that an adjustment for 2018-2019 AMI costs can be filed in the rate case and that, for all subsequent AMI costs, the mechanism to be approved in the 2018 rate case will allow for the timely recovery of such costs.

Entergy Texas

In April 2017 the Texas legislature enacted legislation that extends statutory support for AMI deployment to Entergy Texas and directs that if Entergy Texas elects to deploy AMI, it shall do so as rapidly as practicable. In July 2017, Entergy Texas filed an application seeking an order from the PUCT approving Entergy Texas’s deployment of AMI. Entergy Texas proposed to replace existing meters with advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems. AMI is intended to serve as the foundation of Entergy Texas’s modernized power grid. The filing included an estimate of implementation costs for AMI of $132 million. The filing identified a number of quantified and unquantified benefits, with Entergy Texas showing that its AMI deployment is expected to produce nominal net operational cost savings to customers of $33 million. Entergy Texas also sought to continue to include in rate base the remaining book value, approximately $41 million at December 31, 2016, of existing meters that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates. Entergy Texas proposed a seven-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019. Entergy Texas also proposed a surcharge tariff to recover the reasonable and necessary costs it has and will incur under the deployment plan for the full deployment of advanced meters. Further, Entergy Texas sought approval of fees that would be charged to customers who choose to opt out of receiving service through an advanced meter and instead receive electric service with a non-standard meter. In October 2017, Entergy Texas and other parties entered into and filed an unopposed stipulation and settlement agreement, permitting deployment of AMI with limited modifications. The PUCT approved the stipulation and settlement agreement in December 2017. Consistent with the approval, deployment of the communications network is expected to begin in 2018. Entergy Texas expects to recover the remaining net book value of its existing meters through a regulatory asset to be amortized at current depreciation rates.

Entergy Louisiana and Entergy Gulf States Louisiana Business Combination

Entergy Louisiana and Entergy Gulf States Louisiana filed an application with the LPSC in September 2014 seeking authorization to undertake transactions that would result in the combination of Entergy Louisiana and Entergy Gulf States Louisiana into a single public utility. An uncontested stipulated settlement (stipulated settlement) was filed with the LPSC in July 2015. Through the stipulated settlement, the parties agreed to terms upon which to recommend that the LPSC find that the business combination was in the public interest. The stipulated settlement, which was either joined, or unopposed, by all parties to the LPSC proceeding, represented a compromise of stakeholder positions and was the result of an extensive period of analysis, discovery, and negotiation. The stipulated settlement provided $107 million in guaranteed customer benefits during the first nine years following the transaction’s close. Additionally, the combined company would honor the 2013 Entergy Louisiana and Entergy Gulf States Louisiana rate case settlements, including the commitments that (1) there would be no rate increase for legacy Entergy Gulf States Louisiana customers for the 2014 test year, and (2) through the 2016 test year formula rate plan, Entergy Louisiana (as a combined entity) would not raise rates by more than $30 million, net of the $10 million rate increase included in the Entergy Louisiana legacy formula rate plan. The stipulated settlement also provided that Entergy Gulf States Louisiana and Entergy Louisiana would be permitted to defer certain external costs that were incurred to achieve the business combination’s customer benefits. In 2015 deferrals of $16 million for these external costs were recorded, and they are being amortized over a 10-year period. The LPSC approved the business combination in August 2015.

On October 1, 2015, the businesses formerly conducted by Entergy Louisiana and Entergy Gulf States Louisiana were combined into a single public utility. With the completion of the business combination, Entergy Louisiana holds substantially all of the assets, and has assumed the liabilities, of Entergy Louisiana and Entergy Gulf States Louisiana. The combination was accounted for as a transaction between entities under common control. See Note 3 to the financial statements for further discussion of the customer credits resulting from the business combination.

Algiers Asset Transfer (Entergy Louisiana and Entergy New Orleans)

In October 2014, Entergy Louisiana and Entergy New Orleans filed an application with the City Council seeking authorization to undertake a transaction that would result in the transfer from Entergy Louisiana to Entergy New Orleans of certain assets that supported the provision of service to Entergy Louisiana’s customers in Algiers. In April 2015 the FERC issued an order approving the Algiers assets transfer. In May 2015 the parties filed a settlement agreement authorizing the Algiers assets transfer and the settlement agreement was approved by a City Council resolution in May 2015. On September 1, 2015, Entergy Louisiana transferred its Algiers assets to Entergy New Orleans for a purchase price of approximately $85 million. Entergy New Orleans paid Entergy Louisiana $59.6 million, including final true-ups, from available cash and issued a note payable to Entergy Louisiana in the amount of $25.5 million.

System Agreement Cost Equalization Proceedings

Prior to its final termination in 2016, the Utility operating companies historically engaged in the coordinated planning, construction, and operation of generating and bulk transmission facilities under the terms of the System Agreement.  Entergy Arkansas terminated its participation in the System Agreement in December 2013. Entergy Mississippi terminated its participation in the System Agreement in November 2015. The System Agreement terminated with respect to its remaining participants in August 2016.

Although the System Agreement has terminated, certain of the Utility operating companies’ retail regulators continue to pursue litigation involving the System Agreement at the FERC and in federal courts.  The proceedings include challenges to the allocation of costs as defined by the System Agreement and other matters.

In June 2005 the FERC issued a decision in System Agreement litigation that had been commenced by the LPSC, and essentially affirmed its decision in a December 2005 order on rehearing.  The decision included, among other things:

The FERC’s conclusion that the System Agreement no longer roughly equalizes total production costs among the Utility operating companies.
In order to reach rough production cost equalization, the FERC imposed a bandwidth remedy by which each company’s total annual production costs will have to be within +/- 11% of Entergy System average total annual production costs.
In calculating the production costs for this purpose under the FERC’s order, output from the Vidalia hydroelectric power plant will not reflect the actual Vidalia price for the year but is priced at that year’s average price paid by Entergy Louisiana for the exchange of electric energy under Service Schedule MSS-3 of the System Agreement, thereby reducing the amount of Vidalia costs reflected in the comparison of the Utility operating companies’ total production costs.
The remedy ordered by the FERC in 2005 required no refunds and became effective based on calendar year 2006 production costs and the first reallocation payments were made in 2007.
The FERC’s decision reallocated total production costs of the Utility operating companies whose relative total production costs expressed as a percentage of Entergy System average production costs are outside an upper or lower bandwidth.  This was accomplished by payments from Utility operating companies whose production costs were more than 11% below Entergy System average production costs to Utility operating companies whose production costs were more than the Entergy System average production cost, with payments going first to those Utility operating companies whose total production costs were farthest above the Entergy System average.

The LPSC, APSC, MPSC, and the Arkansas Electric Energy Consumers appealed the FERC’s December 2005 decision to the United States Court of Appeals for the D.C. Circuit.  Entergy and the City of New Orleans intervened in the various appeals.  The D.C. Circuit issued its decision in April 2008.  The D.C. Circuit concluded that the FERC’s orders had failed to adequately explain both its conclusion that it was prohibited from ordering refunds for the 20-month period from September 13, 2001 - May 2, 2003 and its determination to implement the bandwidth remedy commencing on January 1, 2006, rather than June 1, 2005.  The D.C. Circuit remanded the case to the FERC for further proceedings on those two issues.

In October 2011 the FERC issued an order addressing the D.C. Circuit remand on the two issues.  On the first issue, the FERC concluded that it did have the authority to order refunds, but decided that it would exercise its equitable discretion and not require refunds for the 20-month period from September 13, 2001 - May 2, 2003.  Because the ruling on refunds relied on findings in the interruptible load proceeding, which is discussed in a separate section below, the FERC concluded that this refund ruling will be held in abeyance pending the outcome of the rehearing requests in the interruptible load proceeding.  On the second issue, the FERC reversed its prior decision and ordered that the prospective bandwidth remedy begin on June 1, 2005 (the date of its initial order in the proceeding) rather than January 1, 2006, as it had previously ordered.  Pursuant to the October 2011 order, Entergy was required to calculate bandwidth payments for the period June - December 2005 utilizing the bandwidth formula tariff prescribed by the FERC that was filed in a December 2006 compliance filing and accepted by the FERC in an April 2007 order.  

In March 2015, in light of a December 2014 decision by the D.C. Circuit in the interruptible load proceeding, Entergy filed with the FERC a motion to establish a briefing schedule on refund issues and an initial brief addressing refund issues. The initial brief argued that the FERC, in response to the D.C. Circuit decision, should clarify its policy on refunds and find that refunds are not required in this proceeding. In October 2015 the FERC issued three orders related to the commencement of the remedy on June 1, 2005 and the inclusion of interest for the period June 1, 2005 through December 31, 2005. Specifically, the FERC rejected Entergy’s request for rehearing of its decision to include interest for the seven-month period. The FERC also rejected Entergy’s request for rehearing of the order rejecting the compliance filing with regard to the issue of interest. Finally, the FERC set for hearing and settlement procedures the 2014 compliance filing that included the bandwidth calculation for the seven months June 1, 2005 through December 31, 2005. In setting the compliance filing for hearing, the FERC rejected the APSC’s protest that Entergy Arkansas should not be subject to the filing because Entergy Arkansas would be making the payments during a period following its exit from the System Agreement. In January 2018 the D.C.Circuit affirmed the FERC decision that Entergy Arkansas was subject to the filing.

In December 2011, Entergy filed with the FERC its compliance filing that provides the payments and receipts among the Utility operating companies pursuant to the FERC’s October 2011 order.  The APSC, the LPSC, the PUCT, and other parties intervened in the December 2011 compliance filing proceeding, and the APSC and the LPSC also filed protests. The filing shows the following payments/receipts among the Utility operating companies:

 
Payments (Receipts)
 
(In Millions)
Entergy Arkansas
$156
Entergy Louisiana
($75)
Entergy Mississippi
($33)
Entergy New Orleans
($5)
Entergy Texas
($43)


Entergy Arkansas made its payment in January 2012.  In February 2012, Entergy Arkansas filed for an interim adjustment to its production cost allocation rider requesting that the $156 million be collected from customers over the 22-month period from March 2012 through December 2013.  In March 2012 the APSC issued an order stating that the payment can be recovered from retail customers through the production cost allocation rider, subject to refund.  The LPSC and the APSC requested rehearing of the FERC’s October 2011 order.  

In February 2014 the FERC issued a rehearing order addressing its October 2011 order. The FERC denied the LPSC’s request for rehearing on the issues of whether the bandwidth remedy should be made effective earlier than June 1, 2005, and whether refunds should be ordered for the 20-month refund effective period. The FERC granted the LPSC’s rehearing request on the issue of interest on the bandwidth payments/receipts for the June - December 2005 period, requiring that interest be accrued from June 1, 2006 until the date those bandwidth payments/receipts are made. Also in February 2014 the FERC issued an order rejecting the December 2011 compliance filing that calculated the bandwidth payments/receipts for the June - December 2005 period. The FERC order required a new compliance filing that calculates the bandwidth payments/receipts for the June - December 2005 period based on monthly data for the seven individual months including interest pursuant to the February 2014 rehearing order. Entergy sought rehearing of the February 2014 order with respect to the FERC’s determinations regarding interest. In April 2014 the LPSC filed a petition for review of the FERC’s October 2011 and February 2014 orders with the U.S. Court of Appeals for the D.C. Circuit. In August 2017 the D.C. Circuit issued a decision addressing the LPSC’s appeal of the FERC’s October 2011 and February 2014 orders. On the issue of the FERC’s implementation of the prospective remedy as of June 2005 and whether the bandwidth remedy should be extended for an additional 17 months in years 2004-2005, the D.C. Circuit affirmed the FERC’s implementation of the remedy and denied the LPSC’s appeal. On the issue of whether the operating companies should be required to issue refunds for the 20-month period from September 2001 to May 2003, the D.C. Circuit granted the FERC’s request for agency reconsideration and remanded that issue back to the FERC for further proceedings as requested by all parties to the appeal.

In April and May 2014, Entergy filed with the FERC an updated compliance filing that provides the payments and receipts among the Utility operating companies pursuant to the FERC’s February 2014 orders.  The filing shows the following net payments and receipts, including interest, among the Utility operating companies:
 
Payments (Receipts)
 
(In Millions)
Entergy Arkansas
$68
Entergy Louisiana
($10)
Entergy Mississippi
($11)
Entergy New Orleans
$2
Entergy Texas
($49)

These payments were made in May 2014. The LPSC, City Council, and APSC filed protests.

The hearing on the bandwidth calculation for the seven months June 1, 2005 through December 31, 2005 occurred in July 2016. The presiding judge issued an initial decision in November 2016. In the initial decision, the presiding judge agreed with the Utility operating companies’ position that: (1) interest on the bandwidth payments for the 2005 test period should be accrued from June 1, 2006 until the date that the bandwidth payments for that calculation are paid, which is consistent with how the Utility operating companies performed the calculation; and (2) a portion of Entergy Louisiana’s 2001-vintage Louisiana state net operating loss accumulated deferred income tax that results from the Vidalia tax deduction should be excluded from the 2005 test period bandwidth calculation. Various participants filed briefs on exceptions and/or briefs opposing exceptions related to the initial decision, including the LPSC, the APSC, the FERC trial staff, and Entergy Services. The initial decision is pending before the FERC.

Rough Production Cost Equalization Rates

Each May from 2007 through 2016 Entergy filed with the FERC the rates to implement the FERC’s orders in the System Agreement proceeding.  These filings showed the following payments/receipts among the Utility operating companies were necessary to achieve rough production cost equalization as defined by the FERC’s orders:
 
Payments (Receipts)
 
2007
 
2008
 
2009
 
2010
 
2011
 
2012
 
2013
 
2014
 
(In Millions)
Entergy Arkansas

$252

 

$252

 

$390

 

$41

 

$77

 

$41

 

$—

 

$—

Entergy Louisiana

($211
)
 

($160
)
 

($247
)
 

($22
)
 

($12
)
 

($41
)
 

$—

 

$—

Entergy Mississippi

($41
)
 

($20
)
 

($24
)
 

($19
)
 

($40
)
 

$—

 

$—

 

$—

Entergy New Orleans

$—

 

($7
)
 

$—

 

$—

 

($25
)
 

$—

 

($15
)
 

($15
)
Entergy Texas

($30
)
 

($65
)
 

($119
)
 

$—

 

$—

 

$—

 

$15

 

$15



The Utility operating companies recorded accounts payable or accounts receivable to reflect the rough production cost equalization payments and receipts required to implement the FERC’s remedy.  When accounts payable were recorded, a corresponding regulatory asset was recorded for the right to collect the payments from customers. When accounts receivable were recorded, a corresponding regulatory liability was recorded for the obligations to pass the receipts on to customers.  No payments were required in 2016 or 2015 to implement the FERC’s remedy based on calendar year 2015 production costs and 2014 production costs, respectively. The System Agreement terminated in August 2016.

The APSC approved a production cost allocation rider for recovery from customers of the retail portion of the costs allocated to Entergy Arkansas.  Entergy Texas recovered its 2013 rough production cost equalization payment over three years beginning April 2014. Entergy Texas included its 2014 rough production cost equalization payment as a component of an interim fuel refund made in 2014. Management believes that any changes in the allocation of production costs resulting from the FERC’s decision and related retail proceedings should result in similar rate changes for retail customers, subject to specific circumstances that have caused trapped costs.

The following rough production cost equalization rate proceedings are still ongoing.

2010 Rate Filing Based on Calendar Year 2009 Production Costs

In May 2010, Entergy filed with the FERC the 2010 rates in accordance with the FERC’s orders in the System Agreement proceeding, and supplemented the filing in September 2010.  Several parties intervened in the proceeding at the FERC, including the LPSC and the City Council, which also filed protests.  In July 2010 the FERC accepted Entergy’s proposed rates for filing, effective June 1, 2010, subject to refund.  After an abeyance of the proceeding schedule, a hearing was held in March 2014 and in December 2015 the FERC issued an order. Among other things, the December 2015 order directed Entergy to submit a compliance filing. In January 2016 the LPSC, the APSC, and Entergy filed requests for rehearing of the FERC’s December 2015 order. In February 2016, Entergy submitted the compliance filing ordered in the December 2015 order.  The result of the true-up payments and receipts for the recalculation of production costs resulted in the following payments/receipts among the Utility operating companies:
 
Payments (Receipts)
 
(In Millions)
Entergy Arkansas
$2
Entergy Louisiana
$6
Entergy Mississippi
($4)
Entergy New Orleans
($1)
Entergy Texas
($3)

 
In September 2016 the FERC accepted the February 2016 compliance filing subject to a further compliance filing made in November 2016. The further compliance filing was required as a result of an order issued in September 2016 ruling on the January 2016 rehearing requests filed by the LPSC, the APSC, and Entergy. In the order addressing the rehearing requests, the FERC granted the LPSC’s rehearing request and directed that interest be calculated on the payment/receipt amounts. The FERC also granted the APSC’s and Entergy’s rehearing request and ordered the removal of both securitized asset accumulated deferred income taxes and contra-securitization accumulated deferred income taxes from the calculation. In November 2016, Entergy submitted its compliance filing in response to the FERC’s order on rehearing. The compliance filing included a revised refund calculation of the true-up payments and receipts based on 2009 test year data and interest calculations. The LPSC protested the interest calculations. In November 2017 the FERC issued an order rejecting the November 2016 compliance filing. The FERC determined that the payments detailed in the November 2016 compliance filing did not include adequate interest for the payments from Entergy Arkansas to Entergy Louisiana because it did not include interest on the principal portion of the payment that was made in February 2016. In December 2017, Entergy recalculated the interest pursuant to the November 2017 order. As a result of the recalculations, Entergy Arkansas owed very minor payments to Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans.

2011 Rate Filing Based on Calendar Year 2010 Production Costs

In May 2011, Entergy filed with the FERC the 2011 rates in accordance with the FERC’s orders in the System Agreement proceeding.  Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest.  In July 2011 the FERC accepted Entergy’s proposed rates for filing, effective June 1, 2011, subject to refund. After an abeyance of the proceeding schedule, in December 2014 the FERC consolidated the 2011 rate filing with the 2012, 2013, and 2014 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

2012 Rate Filing Based on Calendar Year 2011 Production Costs

In May 2012, Entergy filed with the FERC the 2012 rates in accordance with the FERC’s orders in the System Agreement proceeding.  Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest.  In August 2012 the FERC accepted Entergy’s proposed rates for filing, effective June 2012, subject to refund. After an abeyance of the proceeding schedule, in December 2014 the FERC consolidated the 2012 rate filing with the 2011, 2013, and 2014 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

2013 Rate Filing Based on Calendar Year 2012 Production Costs

In May 2013, Entergy filed with the FERC the 2013 rates in accordance with the FERC’s orders in the System Agreement proceeding. Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest. The City Council intervened and filed comments related to including the outcome of a related FERC proceeding in the 2013 cost equalization calculation. In August 2013 the FERC issued an order accepting the 2013 rates, effective June 1, 2013, subject to refund. After an abeyance of the proceeding schedule, in December 2014 the FERC consolidated the 2013 rate filing with the 2011, 2012, and 2014 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

2014 Rate Filing Based on Calendar Year 2013 Production Costs

In May 2014, Entergy filed with the FERC the 2014 rates in accordance with the FERC’s orders in the System Agreement proceeding. Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest. The City Council intervened and filed comments. In December 2014 the FERC issued an order accepting the 2014 rates, effective June 1, 2014, subject to refund, set the proceeding for hearing procedures, and consolidated the 2014 rate filing with the 2011, 2012, and 2013 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

Consolidated 2011, 2012, 2013, and 2014 Rate Filing Proceedings

As discussed above, in December 2014 the FERC consolidated the 2011, 2012, 2013, and 2014 rate filings for settlement and hearing procedures. In May 2015, Entergy filed direct testimony in the consolidated rate filings and the LPSC filed direct testimony concerning its complaint proceeding that is consolidated with the rate filings, challenging certain components of the pending bandwidth calculations for prior years. Hearings occurred in November 2015, and the ALJ issued an initial decision in July 2016. In the initial decision, the ALJ generally agreed with Entergy’s bandwidth calculations with one exception on the accounting related to the Waterford 3 sale/leaseback. Briefs were filed in September 2016 and the proceeding is pending.

Utility Operating Company Termination of System Agreement Participation

Entergy Arkansas and Entergy Mississippi ceased participating in the System Agreement effective December 18, 2013 and November 7, 2015, respectively. Entergy Louisiana, Entergy New Orleans, and Entergy Texas terminated participation in the System Agreement on August 31, 2016, which resulted in the termination of the System Agreement in its entirety pursuant to a settlement agreement approved by the FERC in December 2015.

In December 2013 the FERC set one issue for hearing involving whether and how the benefits associated with settlement with Union Pacific regarding certain coal delivery issues should be allocated among Entergy Arkansas and the other Utility operating companies post-termination of the System Agreement. In December 2014 a FERC ALJ issued an initial decision finding that Entergy Arkansas would realize benefits after December 18, 2013 from the 2008 settlement agreement between Entergy Services, Entergy Arkansas, and Union Pacific, related to certain coal delivery issues. The ALJ further found that all of the Utility operating companies should share in those benefits pursuant to a methodology proposed by the MPSC. The Utility operating companies and other parties to the proceeding filed briefs on exceptions and/or briefs opposing exceptions with the FERC challenging various aspects of the December 2014 initial decision. In March 2016 the FERC issued an opinion affirming the December 2014 initial decision with regard to the determination that there were benefits related to the Union Pacific settlement, which were realized post-Entergy Arkansas’s December 2013 withdrawal from the System Agreement, that should be shared with the other Utility operating companies utilizing the methodology proposed by the MPSC and trued-up to actual coal volumes purchased. In May 2016, Entergy made a compliance filing that provided the calculation of Union Pacific settlement benefits utilizing the methodology adopted by the initial decision, trued-up for the actual volumes of coal purchased. The payments were made in May 2016. In August 2016 the FERC issued an order accepting Entergy’s compliance filing. Also in August 2016 the APSC filed a petition for review of the FERC’s March 2016 and August 2016 orders with the U.S. Court of Appeals for the D.C. Circuit. Oral argument before the D.C. Circuit was held on the APSC’s petition in January 2018 and a decision is pending.

In connection with the System Agreement termination settlement agreement, the purchase power agreements, referred to as the jurisdictional separation plan PPAs, between Entergy Texas and Entergy Gulf States Louisiana that were put in place for certain legacy gas units at the time of Entergy Gulf States’s separation into Entergy Texas and Entergy Gulf States Louisiana terminated effective with the System Agreement termination. Similarly, the purchase power agreement between Entergy Gulf States Louisiana and Entergy Texas for the Calcasieu unit also terminated. In March 2016, Entergy Services filed with the FERC the notices of termination. The jurisdictional separation plan PPAs were the means by which Entergy Texas received payment for its receivable associated with Entergy Louisiana’s Spindletop gas storage facility regulatory asset. As a result of the System Agreement termination settlement agreement, effective with the termination date, Entergy Texas no longer receives payments from Entergy Louisiana related to the Spindletop storage facility, which resulted in a write-off recorded in 2015 by Entergy Texas of $23.5 million ($15.3 million net-of-tax). Upon termination of the System Agreement, other purchase power agreements entered into under Service Schedule MSS-4 of the System Agreement were replaced with updated agreements under a FERC-jurisdictional tariff effective September 1, 2016.

Interruptible Load Proceeding

In April 2007 the U.S. Court of Appeals for the D.C. Circuit issued its opinion in the LPSC’s appeal of the FERC’s March 2004 and April 2005 orders related to the treatment under the System Agreement of the Utility operating companies’ interruptible loads.  In its opinion the D.C. Circuit concluded that the FERC: (1) acted arbitrarily and capriciously by allowing the Utility operating companies to phase-in the effects of the elimination of the interruptible load over a 12-month period of time; (2) failed to adequately explain why refunds could not be ordered under Section 206(c) of the Federal Power Act; and (3) exercised appropriately its discretion to defer addressing the cost of sulfur dioxide allowances until a later time.  The D.C. Circuit remanded the matter to the FERC for a more considered determination on the issue of refunds.  The FERC issued its order on remand in September 2007, in which it directed Entergy to make a compliance filing removing all interruptible load from the computation of peak load responsibility commencing April 1, 2004 and to issue any necessary refunds to reflect this change.  In addition, the order directed the Utility operating companies to make refunds for the period May 1995 through July 1996.  In November 2007 the Utility operating companies filed a refund report describing the refunds to be issued pursuant to the FERC’s orders.  The LPSC filed a protest to the refund report in December 2007, and the Utility operating companies filed an answer to the protest in January 2008.  The refunds were made in October 2008 by the Utility operating companies that owed refunds to the Utility operating companies that were due refunds under the decision.  The APSC and the Utility operating companies appealed the FERC decisions to the D.C. Circuit.

Following the filing of petitioners’ initial briefs, the FERC filed a motion requesting the D.C. Circuit hold the appeal of the FERC’s decisions ordering refunds in the interruptible load proceeding in abeyance and remand the record to the FERC.  The D.C. Circuit granted the FERC’s unopposed motion in June 2009.  In December 2009 the FERC established a paper hearing to determine whether the FERC had the authority and, if so, whether it would be appropriate to order refunds resulting from changes in the treatment of interruptible load in the allocation of capacity costs by the Utility operating companies.  In August 2010 the FERC issued an order stating that it has the authority and refunds are appropriate.  The APSC, the MPSC, and Entergy requested rehearing of the FERC’s decision.  In June 2011 the FERC issued an order granting rehearing in part and denying rehearing in part, in which the FERC determined to invoke its discretion to deny refunds.  The FERC held that in this case where “the Entergy system as a whole collected the proper level of revenue, but, as was later established, incorrectly allocated peak load responsibility among the various Entergy operating companies….the Commission will apply here our usual practice in such cases, invoking our equitable discretion to not order refunds, notwithstanding our authority to do so.”  The LPSC has requested rehearing of the FERC’s June 2011 decision.  In July 2011 the refunds made in the fourth quarter 2009 described above were reversed. In October 2011 the FERC issued an “Order Establishing Paper Hearing” inviting parties that oppose refunds to file briefs within 30 days addressing the LPSC’s argument that FERC precedent supports refunds under the circumstances present in this proceeding.  Parties that favor refunds were then invited to file reply briefs within 21 days of the date that the initial briefs were due.  

In September 2010 the FERC had issued an order setting the refund report filed in the proceeding in November 2007 for hearing and settlement judge procedures.  In May 2011, Entergy filed a settlement agreement that resolved all issues relating to the refund report set for hearing.  In June 2011 the settlement judge certified the settlement as uncontested.  The settlement agreement was approved by the FERC in September 2016.

Prior to the FERC’s June 2011 order on rehearing, Entergy Arkansas filed an application in November 2010 with the APSC for recovery of the refund that it paid.  The APSC denied Entergy Arkansas’s application, and also denied Entergy Arkansas’s petition for rehearing.  If the FERC were to order Entergy Arkansas to pay refunds on rehearing in the interruptible load proceeding the APSC’s decision would trap FERC-approved costs at Entergy Arkansas with no regulatory-approved mechanism to recover them.  In August 2011, Entergy Arkansas filed a complaint in the United States District Court for the Eastern District of Arkansas asking for a declaratory judgment that the rejection of Entergy Arkansas’s application by the APSC is preempted by the Federal Power Act.  The APSC filed a motion to dismiss the complaint.  In April 2012 the United States district court dismissed Entergy Arkansas’s complaint without prejudice stating that Entergy Arkansas’s claim is not ripe for adjudication and that Entergy Arkansas did not have standing to bring suit at this time.

In March 2013 the FERC issued an order denying the LPSC’s request for rehearing of the FERC’s June 2011 order wherein the FERC concluded it would exercise its discretion and not order refunds in the interruptible load proceeding. Based on its review of the LPSC’s request for rehearing and the briefs filed as part of the paper hearing established in October 2011, the FERC affirmed its earlier ruling and declined to order refunds under the circumstances of the case. In May 2013 the LPSC filed a petition for review with the U.S. Court of Appeals for the D.C. Circuit seeking review of FERC prior orders in the interruptible load proceeding that concluded that the FERC would exercise its discretion and not order refunds in the proceeding. Oral argument was held on the appeal in the D.C. Circuit in September 2014. In December 2014 the D.C. Circuit issued an order on the LPSC’s appeal and remanded the case back to the FERC. The D.C. Circuit rejected the LPSC’s argument that there is a presumption in favor of refunds, but it held that the FERC had not adequately explained its decision to deny refunds and directed the FERC “to consider the relevant factors and weigh them against one another.” In March 2015, Entergy filed with the FERC a motion to establish a briefing schedule on remand and an initial brief on remand to address the December 2014 decision by the D.C. Circuit. The initial brief on remand argued that the FERC, in response to the D.C. Circuit decision, should clarify its policy on refunds and find that refunds are not required in the interruptible load proceeding.

In April 2016 the FERC issued an order on remand that addressed the December 2014 decision by the D.C. Circuit in the interruptible load proceeding. The order on remand affirmed the FERC’s denial of refunds for the 15-month refund effective period. The FERC explained and clarified its policies regarding refunds and concluded that the evidence in the record demonstrated that the relevant equitable factors favored not requiring refunds in this case. The FERC also noted that, under Section 206(c) of the Federal Power Act, in a Section 206 proceeding involving two or more electric utility companies of a registered holding company system, the FERC may order refunds only if it determines the refunds would not cause the registered holding company to experience any reduction in revenues resulting from an inability of an electric utility company in the system to recover the resulting increase in costs. The FERC stated it was not able to find that the Entergy system would not experience a reduction in revenues if refunds were awarded in this proceeding, which further supported the denial of refunds. In May 2016 the LPSC filed a request for rehearing of the FERC’s April 2016 order. In September 2016 the FERC issued an order denying the LPSC’s request for rehearing and reaffirming its denial of refunds for the 15-month refund effective period. The LPSC has appealed the April and September 2016 orders to the U.S. Court of Appeals for the D.C. Circuit. Oral argument before the D.C. Circuit was held before the D.C. Circuit in February 2018 and a decision is pending.
 
Entergy Arkansas Opportunity Sales Proceeding

In June 2009 the LPSC filed a complaint requesting that the FERC determine that certain of Entergy Arkansas’s sales of electric energy to third parties: (a) violated the provisions of the System Agreement that allocated the energy generated by Entergy System resources; (b) imprudently denied the Entergy System and its ultimate consumers the benefits of low-cost Entergy System generating capacity; and (c) violated the provision of the System Agreement that prohibited sales to third parties by individual companies absent an offer of a right-of-first-refusal to other Utility operating companies.   The LPSC’s complaint challenged sales made beginning in 2002 and requested refunds.  In July 2009 the Utility operating companies filed a response to the complaint requesting that the FERC dismiss the complaint on the merits without hearing because the LPSC has failed to meet its burden of showing any violation of the System Agreement and failed to produce any evidence of imprudent action by the Entergy System.  In their response, the Utility operating companies explained that the System Agreement clearly contemplates that the Utility operating companies may make sales to third parties for their own account, subject to the requirement that those sales be included in the load (or load shape) for the applicable Utility operating company.  The FERC subsequently ordered a hearing in the proceeding.

The LPSC filed direct testimony in the proceeding alleging, among other things, (1) that Entergy violated the System Agreement by permitting Entergy Arkansas to make non-requirements sales to non-affiliated third parties rather than making such energy available to the other Utility operating companies’ customers; and (2) that over the period 2000 - 2009, these non-requirements sales caused harm to the Utility operating companies’ customers and these customers should be compensated for this harm by Entergy.  In subsequent testimony, the LPSC modified its original damages claim in favor of quantifying damages by re-running intra-system bills.  The Utility operating companies believe the LPSC’s allegations are without merit.  A hearing in the matter was held in August 2010.

In December 2010 the ALJ issued an initial decision.  The ALJ found that the System Agreement allowed for Entergy Arkansas to make the sales to third parties but concluded that the sales should be accounted for in the same manner as joint account sales.  The ALJ concluded that “shareholders” should make refunds of the damages to the Utility operating companies, along with interest.  Entergy disagreed with several aspects of the ALJ’s initial decision and in January 2011 filed with the FERC exceptions to the decision.

The FERC issued a decision in June 2012 and held that, while the System Agreement is ambiguous, it does provide authority for individual Utility operating companies to make opportunity sales for their own account and Entergy Arkansas made and priced these sales in good faith.  The FERC found, however, that the System Agreement does not provide authority for an individual Utility operating company to allocate the energy associated with such opportunity sales as part of its load, but provides a different allocation authority.  The FERC further found that the after-the-fact accounting methodology used to allocate the energy used to supply the sales was inconsistent with the System Agreement.  Quantifying the effect of the FERC’s decision requires re-running intra-system bills for a ten-year period, and the FERC in its decision established further hearing procedures to determine the calculation of the effects.  In July 2012, Entergy and the LPSC filed requests for rehearing of the FERC’s June 2012 decision. A hearing was held in May 2013 to quantify the effect of repricing the opportunity sales in accordance with the FERC’s June 2012 decision.

In August 2013 the presiding judge issued an initial decision in the calculation proceeding. The initial decision concluded that the methodology proposed by the LPSC, rather than the methodologies proposed by Entergy or the FERC Staff, should be used to calculate the payments that Entergy Arkansas is to make to the other Utility operating companies. The initial decision also concluded that the other System Agreement service schedules should not be adjusted and that payments by Entergy Arkansas should not be reflected in the rough production cost equalization bandwidth calculations for the applicable years. The initial decision recognized that the LPSC’s methodology would result in an inequitable windfall to the other Utility operating companies and, therefore, concluded that any payments by Entergy Arkansas should be reduced by 20%. The LPSC, the APSC, the City Council, and FERC staff filed briefs on exceptions and/or briefs opposing exceptions. Entergy filed a brief on exceptions requesting that the FERC reverse the initial decision and a brief opposing certain exceptions taken by the LPSC and FERC staff.

In April 2016 the FERC issued orders addressing requests for rehearing filed in July 2012 and the ALJ’s August 2013 initial decision. The first order denied Entergy’s request for rehearing and affirmed the FERC’s earlier rulings that Entergy’s original methodology for allocating energy costs to the opportunity sales was incorrect and, as a result, Entergy Arkansas must make payments to the other Utility operating companies to put them in the same position that they would have been in absent the incorrect allocation. The FERC clarified that interest should be included with the payments. The second order affirmed in part, and reversed in part, the rulings in the ALJ’s August 2013 initial decision regarding the methodology that should be used to calculate the payments Entergy Arkansas is to make to the other Utility operating companies. The FERC affirmed the ALJ’s ruling that a full re-run of intra-system bills should be performed, but required that methodology be modified so that the sales have the same priority for purposes of energy allocation as joint account sales. The FERC reversed the ALJ’s decision that any payments by Entergy Arkansas should be reduced by 20%. The FERC also reversed the ALJ’s decision that adjustments to other System Agreement service schedules and excess bandwidth payments should not be taken into account when calculating the payments to be made by Entergy Arkansas. The FERC held that such adjustments and excess bandwidth payments should be taken into account, but ordered further proceedings before an ALJ to address whether a cap on any reduction due to bandwidth payments was necessary and to implement the other adjustments to the calculation methodology.

In May 2016, Entergy Services filed a request for rehearing of the FERC’s April 2016 order arguing that payments made by Entergy Arkansas should be reduced as a result of the timing of the LPSC’s approval of certain contracts. Entergy Services also filed a request for clarification and/or rehearing of the FERC’s April 2016 order addressing the ALJ’s August 2013 initial decision. The APSC and the LPSC also filed requests for rehearing of the FERC’s April 2016 order. In September 2017 the FERC issued an order denying the request for rehearing on the issue of whether any payments by Entergy Arkansas to the other Utility operating companies should be reduced due to the timing of the LPSC’s approval of Entergy Arkansas’s wholesale baseload contract with Entergy Louisiana. In November 2017 the FERC issued an order denying all of the remaining requests for rehearing of the April 2016 order. In November 2017, Entergy Services filed a petition for review in the D.C. Circuit of the FERC’s orders in the first two phases of the opportunity sales case. In December 2017 the D.C. Circuit granted Entergy Services’s request to hold the appeal in abeyance pending final resolution of the related proceeding still pending with the FERC. In January 2018 the APSC and the LPSC filed separate petitions for review in the D.C. Circuit, and the D.C. Circuit consolidated the appeals with Entergy Services’s appeal and held all of the appeals in abeyance.

Pursuant to the procedural schedule established in the case, Entergy Services re-ran intra-system bills for the ten-year period 2000-2009 to quantify the effects of the FERC's ruling. In November 2016 the LPSC submitted testimony disputing certain aspects of the calculations. A hearing was held in May 2017. In July 2017, the ALJ issued an initial decision concluding that Entergy Arkansas should pay $86 million plus interest to the other Utility operating companies. In August 2017 the Utility operating companies, the LPSC, the APSC, and FERC staff filed individual briefs on exceptions challenging various aspects of the initial decision. In September 2017 the Utility operating companies, the LPSC, the APSC, the MPSC, the City Council, and FERC staff filed separate briefs opposing exceptions taken by various parties. The case is pending before the FERC. No payments will be made or received by the Utility operating companies until the FERC issues an order reviewing the initial decision and Entergy submits a subsequent filing to comply with that order.

The effect of the FERC’s decisions thus far in the case would be that Entergy Arkansas will make payments to some or all of the other Utility operating companies. Because further proceedings will still occur in the case, the amount and recipients of payments by Entergy Arkansas are unknown at this time. Based on testimony previously submitted in the case and its assessment of the April 2016 FERC orders, in the first quarter 2016, Entergy Arkansas recorded a liability of $87 million, which includes interest, for its estimated increased costs and payment to the other Utility operating companies. This estimate is subject to change depending on how the FERC resolves the issues that are still outstanding in the case, including its review of the July 2017 initial decision. Entergy Arkansas’s increased costs will be attributed to Entergy Arkansas’s retail and wholesale businesses, and it is not probable that Entergy Arkansas will recover the wholesale portion. Entergy Arkansas, therefore, recorded a deferred fuel regulatory asset in the first quarter 2016 of approximately $75 million, which represents its estimate of the retail portion of the costs. Following its assessment of the course of the proceedings, including the FERC’s denial of rehearing in November 2017 described above, in the fourth quarter 2017, Entergy Arkansas recorded an additional liability of $35 million and a regulatory asset of $31 million. Because management currently expects to recover the retail portion of the costs through a base rate proceeding or newly proposed rider, the regulatory asset is reflected as Other regulatory assets as of December 31, 2017.
    
Complaint Against System Energy

In January 2017 the APSC and MPSC filed a complaint with the FERC against System Energy. The complaint seeks a reduction in the return on equity component of the Unit Power Sales Agreement pursuant to which System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. Entergy Arkansas also sells some of its Grand Gulf capacity and energy to Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under separate agreements. The current return on equity under the Unit Power Sales Agreement is 10.94%. The complaint alleges that the return on equity is unjust and unreasonable because current capital market and other considerations indicate that it is excessive. The complaint requests the FERC to institute proceedings to investigate the return on equity and establish a lower return on equity, and also requests that the FERC establish January 23, 2017 as a refund effective date. The complaint includes return on equity analysis that purports to establish that the range of reasonable return on equity for System Energy is between 8.37% and 8.67%. System Energy answered the complaint in February 2017 and disputes that a return on equity of 8.37% to 8.67% is just and reasonable. The LPSC and the City Council intervened in the proceeding expressing support for the complaint. System Energy is recording a provision against revenue for the potential outcome of this proceeding. In September 2017 the FERC established a refund effective date of January 23, 2017, consolidated the return on equity complaint with the proceeding described in Unit Power Sales Agreement below, and directed the parties to engage in settlement proceedings before an ALJ. If the parties fail to come to an agreement during settlement proceedings, a prehearing conference will be held to establish a procedural schedule for hearing proceedings.

Unit Power Sales Agreement

In August 2017, System Energy submitted to the FERC proposed amendments to the Unit Power Sales Agreement pursuant to which System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. The filing proposes limited amendments to the Unit Power Sales Agreement to adopt (1) updated rates for use in calculating Grand Gulf plant depreciation and amortization expenses and (2) updated nuclear decommissioning cost annual revenue requirements, both of which are recovered through the Unit Power Sales Agreement rate formula. The proposed amendments would result in lower charges to the Utility operating companies that buy capacity and energy from System Energy under the Unit Power Sales Agreement. The proposed changes are based on updated depreciation and nuclear decommissioning studies that take into account the renewal of Grand Gulf’s operating license for a term through November 1, 2044. System Energy requested that the FERC accept the amendments effective October 1, 2017.

In September 2017 the FERC accepted System Energy’s proposed Unit Power Sales Agreement amendments, subject to further proceedings to consider the justness and reasonableness of the amendments. Because the amendments propose a rate decrease, the FERC also initiated an investigation under Section 206 of the Federal Power Act to determine if the rate decrease should be lower than proposed. The FERC accepted the proposed amendments effective October 1, 2017, subject to refund pending the outcome of the further settlement and/or hearing proceedings, and established a refund effective date of October 11, 2017 with respect to the rate decrease. The FERC also consolidated the Unit Power Sales Agreement amendment proceeding with the proceeding described in Complaint Against System Energy above, and directed the parties to engage in settlement proceedings before an ALJ. If the parties fail to come to an agreement during settlement proceedings, a prehearing conference will be held to establish a procedural schedule for hearing proceedings.

Storm Cost Recovery Filings with Retail Regulators

Entergy Louisiana

Hurricane Isaac

In August 2012, Hurricane Isaac caused extensive damage to Entergy Louisiana’s service area.  The storm resulted in widespread power outages, significant damage primarily to distribution infrastructure, and the loss of sales during the power outages.  In June 2014 the LPSC authorized Entergy Louisiana to utilize Louisiana Act 55 financing for Hurricane Isaac system restoration costs.  Entergy Louisiana committed to pass on to customers a minimum of $30.8 million of customer benefits through annual customer credits of approximately $6.2 million for five years. Approvals for the Act 55 financings were obtained from the Louisiana Utilities Restoration Corporation (LURC) and the Louisiana State Bond Commission.

In August 2014 the Louisiana Local Government Environmental Facilities and Community Development Authority (LCDA) issued $314.85 million in bonds under Louisiana Act 55.  From the $309 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $16 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $293 million directly to Entergy Louisiana.  Entergy Louisiana used the $293 million received from the LURC to acquire 2,935,152.69 Class C preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 7.5% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2014, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement. The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1.75 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC, and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

Hurricane Gustav and Hurricane Ike

In September 2008, Hurricane Gustav and Hurricane Ike caused catastrophic damage to Entergy Louisiana’s service territory.  In December 2009, Entergy Louisiana entered into a stipulation agreement with the LPSC staff regarding its storm costs.  In March and April 2010, Entergy Louisiana and other parties to the proceeding filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal to utilize Act 55 financing, which included a commitment to pass on to customers a minimum of $43.3 million of customer benefits through a prospective annual rate reduction of $8.7 million for five years.  In April 2010 the LPSC approved the settlement and subsequently issued financing orders and a ratemaking order intended to facilitate the implementation of the Act 55 financings.  In June 2010 the Louisiana State Bond Commission approved the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricane Gustav and Hurricane Ike was reduced by $2.7 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2010, the LCDA issued two series of bonds totaling $713.0 million under Act 55.  From the $702.7 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $290 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $412.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana used $412.7 million to acquire 4,126,940.15 Class B preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 9% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2010, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA, and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC, and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.
Hurricane Katrina and Hurricane Rita

In August and September 2005, Hurricanes Katrina and Rita caused catastrophic damage to Entergy Louisiana’s service territory. In March 2008, Entergy Louisiana and the LURC filed at the LPSC an application requesting that the LPSC grant a financing order authorizing the financing of Entergy Louisiana storm costs, storm reserves, and issuance costs pursuant to Louisiana Act 55.  The Louisiana Act 55 financing is expected to produce additional customer benefits as compared to traditional securitization.  Entergy Louisiana also filed an application requesting LPSC approval for ancillary issues including the mechanism to flow charges and savings to customers via a storm cost offset rider.  In April 2008 the Louisiana Public Facilities Authority (LPFA), which is the issuer of the bonds pursuant to the Act 55 financing, approved requests for the Act 55 financing.  Also in April 2008, Entergy Louisiana and the LPSC staff filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal under the Act 55 financing, which included a commitment to pass on to customers a minimum of $40 million of customer benefits through a prospective annual rate reduction of $8 million for five years.  The LPSC subsequently approved the settlement and issued two financing orders and one ratemaking order intended to facilitate implementation of the Act 55 financing.  In May 2008 the Louisiana State Bond Commission granted final approval of the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricanes Katrina and Rita was reduced by $22.3 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2008 the LPFA issued $687.7 million in bonds under the aforementioned Act 55.  From the $679 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $152 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $527 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $545 million, including $17.8 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 5,449,861.85 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 10% annual distribution rate.  In August 2008, the LPFA issued $278.4 million in bonds under the aforementioned Act 55.  From the $274.7 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $87 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $187.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $189.4 million, including $1.7 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 1,893,918.39 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC that carry a 10% annual distribution rate.  Distributions are payable quarterly commencing on September 15, 2008 and have a liquidation price of $100 per unit.  The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.  In February 2012, Entergy Louisiana sold 500,000 of its Class A preferred membership units in Entergy Holdings Company LLC, a wholly-owned Entergy subsidiary, to a third party in exchange for $51 million plus accrued but unpaid distributions on the units.  The 500,000 preferred membership units are mandatorily redeemable in January 2112.

Entergy and Entergy Louisiana do not report the bonds issued by the LPFA on their balance sheets because the bonds are the obligation of the LPFA, and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC, and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

Entergy Mississippi

Entergy Mississippi has approval from the MPSC to collect a storm damage provision of $1.75 million per month. If Entergy Mississippi’s accumulated storm damage provision balance exceeds $15 million, the collection of the storm damage provision ceases until such time that the accumulated storm damage provision becomes less than $10 million. As of April 30, 2016, Entergy Mississippi’s storm damage provision balance was less than $10 million, therefore Entergy Mississippi resumed billing the monthly storm damage provision effective with June 2016 bills. As of September 30, 2016, however, Entergy Mississippi’s storm damage provision balance again exceeded $15 million. Accordingly the storm damage provision was reset to zero beginning with November 2016 bills. As of July 31, 2017, the balance in Entergy Mississippi’s accumulated storm damage provision was again less than $10 million, therefore Entergy Mississippi resumed billing the monthly storm damage provision effective with September 2017 bills.

Entergy New Orleans

In August 2012, Hurricane Isaac caused extensive damage to Entergy New Orleans’s service area. In January 2015 the City Council issued a resolution approving the terms of a joint agreement in principle filed by Entergy New Orleans, Entergy Louisiana, and the City Council Advisors determining, among other things, that Entergy New Orleans’s prudently-incurred storm recovery costs were $49.3 million, of which $31.7 million, net of reimbursements from the storm reserve escrow account, remained recoverable from Entergy New Orleans’s electric customers. The resolution also directed Entergy New Orleans to file an application to securitize the unrecovered City Council-approved storm recovery costs of $31.7 million pursuant to the Louisiana Electric Utility Storm Recovery Securitization Act (Louisiana Act 64). In addition, the resolution found that it was reasonable for Entergy New Orleans to include in the principal amount of its potential securitization the costs to fund and replenish Entergy New Orleans’s storm reserve in an amount that achieved the City Council-approved funding level of $75 million. In January 2015, in compliance with that directive, Entergy New Orleans filed with the City Council an application requesting that the City Council grant a financing order authorizing the financing of Entergy New Orleans’s storm costs, storm reserves, and issuance costs pursuant to Louisiana Act 64. In May 2015 the parties entered into an agreement in principle and the City Council issued a financing order authorizing Entergy New Orleans to issue storm recovery bonds in the aggregate amount of $98.7 million, including $31.8 million for recovery of Entergy New Orleans’s Hurricane Isaac storm recovery costs, including carrying costs, $63.9 million to fund and replenish Entergy New Orleans’s storm reserve, and approximately $3 million for estimated up-front financing costs associated with the securitization. See Note 5 to the financial statements for discussion of the issuance of the securitization bonds in July 2015.

New Nuclear Generation Development Costs

Entergy Louisiana

Entergy Louisiana and Entergy Gulf States Louisiana were developing a project option for new nuclear generation at River Bend.  In March 2010, Entergy Louisiana and Entergy Gulf States Louisiana filed with the LPSC seeking approval to continue the limited development activities necessary to preserve an option to construct a new unit at River Bend.  At its June 2012 meeting the LPSC voted to uphold an ALJ recommendation that the request of Entergy Louisiana and Entergy Gulf States Louisiana be declined on the basis that the LPSC’s rule on new nuclear development does not apply to activities to preserve an option to develop and on the further grounds that the companies improperly engaged in advanced preparation activities prior to certification.  The LPSC directed that Entergy Louisiana and Entergy Gulf States Louisiana be permitted to seek recovery of these costs in their upcoming rate case filings that were subsequently filed in February 2013. In the resolution of the rate case proceeding the LPSC provided for an eight-year amortization of costs incurred in connection with the potential development of new nuclear generation at River Bend, without carrying costs, beginning in December 2014, provided, however, that amortization of these costs shall not result in a future rate increase. As of December 31, 2017, Entergy Louisiana has a regulatory asset of $35.8 million on its balance sheet related to these new nuclear generation development costs.
Entergy Mississippi [Member]  
Rate And Regulatory Matters
RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)
 
Regulatory Assets and Regulatory Liabilities

Regulatory assets represent probable future revenues associated with costs that Entergy expects to recover from customers through the regulatory ratemaking process under which the Utility business operates. Regulatory liabilities represent probable future reductions in revenues associated with amounts that Entergy expects to benefit customers through the regulatory ratemaking process under which the Utility business operates. In addition to the regulatory assets and liabilities that are specifically disclosed on the face of the balance sheets, the tables below provide detail of “Other regulatory assets” and “Other regulatory liabilities” that are included on Entergy’s and the Registrant Subsidiaries’ balance sheets as of December 31, 2017 and 2016:
 
Other Regulatory Assets

Entergy
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$2,642.3

 

$2,635.5

Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
746.0

 
677.2

Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 2 – Storm Cost Recovery Filings with Retail Regulators) (Note 5)
558.9

 
637.0

Removal costs - recovered through depreciation rates (Note 9) (a)
436.5

 
353.9

Opportunity Sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding)
109.8

 

Retail rate deferrals - recovered through rate riders as rates are redetermined by retail regulators
86.4

 
22.1

Unamortized loss on reacquired debt - recovered over term of debt
82.9

 
91.4

Little Gypsy costs – recovered through securitization (Note 5 – Entergy Louisiana Securitization Bonds - Little Gypsy)
73.7

 
100.0

Transition to competition costs - recovered over a 15-year period through February 2021
37.7

 
47.9

New nuclear generation development costs (Note 2 - New Nuclear Generation Development Costs) (b)
36.4

 
43.7

Other
125.1

 
161.2

Entergy Total

$4,935.7

 

$4,769.9



Entergy Arkansas
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$757.0

 

$786.6

Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
345.2

 
322.9

Removal costs - recovered through depreciation rates (Note 9) (a)
176.9

 
128.5

Opportunity sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding)
109.8

 

Storm damage costs - recovered either through securitization or retail rates (Note 5 - Entergy Arkansas Securitization Bonds)
76.2

 
88.9

Retail rate deferrals - recovered through rate riders as rates are redetermined annually
28.2

 
10.1

Unamortized loss on reacquired debt - recovered over term of debt
24.3

 
27.6

ANO Fukushima and Flood Barrier costs - recovered through retail rates through February 2026 (Note 2 - Retail Rate Proceedings) (b)
14.4

 
16.1

Lake Catherine 4 reliability and sustainability cost deferral - recovery through retail rates (b)
8.9

 
9.8

Incremental ice storm costs - recovered through 2032
7.4

 
7.9

MISO costs - recovery through retail rates through 2018 (Note 2 - Retail Rate Proceedings) (b)
5.5

 
11.1

Human capital management costs - recovery through retail rates through August 2019 (Note 2 - Retail Rate Proceedings) (b)
4.4

 
7.0

Other
9.2

 
11.5

Entergy Arkansas Total

$1,567.4

 

$1,428.0



Entergy Louisiana
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans and Non-Qualified Pension Plans) (a)

$724.6

 

$715.7

Asset Retirement Obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
218.6

 
199.4

Little Gypsy costs – recovered through securitization (Note 5 – Entergy Louisiana Securitization Bonds - Little Gypsy)
71.4

 
97.8

New nuclear generation development costs - recovery through formula rate plan beginning December 2014 through November 2022 (Note 2 - New Nuclear Generation Development Costs) (b)
35.8

 
43.1

Unamortized loss on reacquired debt - recovered over term of debt
24.7

 
27.0

Storm damage costs - recovered through retail rates (Note 2 - Storm Cost Recovery Filings with Retail Regulators)
14.3

 

Business combination external costs deferral - recovery through formula rate plan beginning December 2015 through November 2025 (b)
14.1

 
15.2

River Bend AFUDC - recovered through August 2025 (Note 1 – River Bend AFUDC)
12.9

 
14.8

Other
29.4

 
55.1

Entergy Louisiana Total

$1,145.8

 

$1,168.1



Entergy Mississippi
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$218.7

 

$217.2

Removal costs - recovered through depreciation rates (Note 9) (a)
91.6

 
82.0

Retail rate deferrals - recovered through rate riders as rates are redetermined annually
49.4

 
9.3

Unamortized loss on reacquired debt - recovered over term of debt
17.6

 
18.9

Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
7.6

 
7.2

Other
13.0

 
7.6

Entergy Mississippi Total

$397.9

 

$342.2



Entergy New Orleans
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$102.8

 

$108.8

Storm damage costs, including hurricane costs - recovered through retail rates and securitization (Note 2 - Storm Cost Recovery Filings with Retail Regulators)
82.3

 
93.6

Removal costs - recovered through depreciation rates (Note 9) (a)
44.8

 
40.1

Retail rate deferrals - recovered through rate riders as rates are redetermined monthly or annually
4.4

 
4.3

Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
4.3

 
4.2

Unamortized loss on reacquired debt - recovered over term of debt
3.0

 
3.4

Rate case costs - recovered over a 6-year period through September 2021 (Note 2 - Retail Rate Proceedings)
2.6

 
3.0

Michoud plant maintenance – recovered over a 7-year period through September 2018
1.4

 
3.3

Other
5.8

 
7.4

Entergy New Orleans Total

$251.4

 

$268.1



Entergy Texas
 
2017
 
2016
 
(In Millions)
Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 5 - Entergy Texas Securitization Bonds)

$386.1

 

$442.4

Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
169.2

 
201.7

Transition to competition costs - recovered over a 15-year period through February 2021
37.7

 
47.9

Removal costs - recovered through depreciation rates (Note 9) (a)
55.2

 
33.5

Unamortized loss on reacquired debt - recovered over term of debt
8.7

 
9.0

Other
4.5

 
5.7

Entergy Texas Total

$661.4

 

$740.2



System Energy
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans and Other Postretirement Benefits) (a)

$202.7

 

$193.5

Asset retirement obligation - recovery dependent upon timing of decommissioning (Note 9) (a)
169.1

 
142.5

Removal costs - recovered through depreciation rates (Note 9) (a)
67.9

 
69.7

Unamortized loss on reacquired debt - recovered over term of debt
4.6

 
5.5

System Energy Total

$444.3

 

$411.2



(a)
Does not earn a return on investment, but is offset by related liabilities.
(b)
Does not earn a return on investment.
Other Regulatory Liabilities

Entergy
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)

$989.3

 

$735.5

Vidalia purchased power agreement (Note 8) (b)
151.6

 
202.4

Louisiana Act 55 financing savings obligation (Note 2 - Storm Cost Recovery Filings with Retail Regulators) (b)
124.8

 
165.5

Grand Gulf sale-leaseback - (Note 10 - Sale and Leaseback Transactions)
67.9

 
67.9

Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates beginning December 2015 through November 2024 (Note 2 - Entergy Louisiana and Entergy Gulf States Louisiana Business Combination)
65.8

 
83.5

Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4

 
44.4

Asset retirement obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
36.7

 
32.7

Removal costs - returned to customers through depreciation rates (Note 9) (a)
32.4

 
53.9

Entergy Mississippis accumulated accelerated Grand Gulf amortization - amortized and credited through the Unit Power Sales Agreement
32.1

 
39.3

Waterford 3 replacement steam generator provision (Note 2 - Retail Rate Proceedings)

 
68.0

Other
43.5

 
79.8

Entergy Total

$1,588.5

 

$1,572.9


Entergy Arkansas
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)

$354.0

 

$280.8

Other
9.6

 
25.1

Entergy Arkansas Total

$363.6

 

$305.9



Entergy Louisiana
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)

$323.7

 

$235.4

Vidalia purchased power agreement (Note 8) (b)
151.6

 
202.4

Louisiana Act 55 financing savings obligation (Note 2 - Storm Cost Recovery Filings with Retail Regulators) (b)
124.8

 
165.5

Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates beginning December 2015 through November 2024 (Note 2 - Entergy Louisiana and Entergy Gulf States Louisiana Business Combination)
65.8

 
83.5

Gas hedging costs - refunded through fuel rates (Note 15 - Derivatives)

 
10.9

Asset Retirement Obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
36.7

 
32.7

Removal costs - returned to customers through depreciation rates (Note 9) (a)
32.4

 
53.9

Waterford 3 replacement steam generator provision (Note 2 - Retail Rate Proceedings)

 
68.0

Other
26.1

 
28.7

Entergy Louisiana Total

$761.1

 

$881.0



Entergy Texas
 
2017
 
2016
 
(In Millions)
Transition to competition costs - returned to customers through rate riders when rates are redetermined periodically

$4.8

 

$6.2

Other
2.1

 
2.3

Entergy Texas Total

$6.9

 

$8.5


System Energy
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 17) (a)

$311.6

 

$219.3

Grand Gulf sale-leaseback - (Note 10 - Sale and Leaseback Transactions)
67.9

 
67.9

Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4

 
44.4

Entergy Mississippis accumulated accelerated Grand Gulf amortization - amortized and credited through the Unit Power Sales Agreement
32.1

 
39.3

System Energy Total

$456.0

 

$370.9



(a)
Offset by related asset.
(b)
As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21% effective January 2018, the Vidalia purchased power agreement regulatory liability was reduced by $30.5 million and the Louisiana Act 55 financing savings obligation regulatory liabilities were reduced by $25.0 million, with corresponding increases to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

Regulatory activity regarding the Tax Cuts and Jobs Act

See the “Other Tax Matters - Tax Cuts and Jobs Act” section in Note 3 to the financial statements for discussion of the effects of the enactment of the Tax Cuts and Jobs Act, in December 2017, including its effects on Entergy’s and the Registrant Subsidiaries’ regulatory asset/liability for income taxes.

After enactment of the Tax Cuts and Jobs Act the APSC issued an order that applies to investor-owned utilities in Arkansas, including Entergy Arkansas. The order requests information regarding certain effects of the Tax Cuts and Jobs Act and requires the utilities to begin, effective January 1, 2018, to record regulatory liabilities to record the effects of the Act, subject to review by the APSC, although the order acknowledges that the exact amount of tax savings and rate reductions cannot be determined at this time. Entergy Arkansas requested clarification or, in the alternative, rehearing regarding the requirement to record a regulatory liability, and also responded to the request for information. In its request for clarification Entergy Arkansas sought clarification that the amount of any regulatory liability would be determined only after the utilities are heard and present evidence on the issue, as this otherwise would be arbitrary and could implicate single-issue and retroactive ratemaking. The APSC has not responded to the request for clarification. In its response to the APSC’s request for information Entergy Arkansas states that its formula rate plan rider already provides the means for customers to realize the benefits of the Act, except for the return of unprotected excess accumulated deferred income taxes. Entergy Arkansas’s next formula rate plan filing is scheduled for July 2018. Entergy Arkansas intends to return unprotected excess accumulated deferred income taxes as expeditiously as possible, subject to a subsequent request to be made by Entergy Arkansas and approval by the APSC.

After enactment of the Tax Cuts and Jobs Act the LPSC passed an agenda item requiring utilities, including Entergy Louisiana, to file reports regarding certain effects of the Act. Entergy Louisiana responded to the directive and stated in its response that it is working with the LPSC staff and other interested parties to extend its formula rate plan such that its next base rate change will occur effective September 2018, or it would file a base rate case. Entergy Louisiana went on to state that if the formula rate plan is extended Entergy Louisiana’s next adjustment of rates will reflect the new 21% federal corporate income tax rate. Entergy Louisiana stated that it is working with the LPSC staff and interested parties to determine when the tax rate reduction will be reflected in rates, along with when and how the excess accumulated deferred income taxes will be reflected in rates, and how certain tax sharing agreement customer credits will be adjusted. On February 21, 2018, the LPSC issued a special order requiring that all LPSC-jurisdictional utilities, beginning as of January 1, 2018, record as a regulatory liability (deferred liability) the amount required to reflect the reduction in the federal corporate income tax rate from 35% to 21% and the associated savings in excess accumulated deferred income taxes until such time as its rates are changed by the LPSC to reflect these federal tax savings. In the same special order, the LPSC also initiated a new rulemaking docket to consider these issues and the appropriate manner in which to flow through the benefits to Louisiana customers and to provide an opportunity for discovery and comments of jurisdictional utilities and other interested stakeholders. The rulemaking further requires the LPSC staff to report back to the LPSC as soon as practicable and preferably by the March 21, 2018, LPSC Business and Executive Session with recommendations as to how the federal tax-related benefits will be flowed through to Louisiana customers.

After enactment of the Tax Cuts and Jobs Act the MPSC ordered utilities, including Entergy Mississippi, that operate under a formula rate plan to file a description by February 26, 2018, of how the Act will be reflected in the formula rate plan under which the utility operates. In addition to the description that is due February 26, 2018, Entergy Mississippi’s formula rate plan 2018 test year filing is scheduled to be filed by March 15, 2018.

After enactment of the Tax Cuts and Jobs Act the City Council passed a resolution ordering Entergy New Orleans to, effective January 1, 2018, record deferred regulatory liabilities to account for the Act’s effect on Entergy New Orleans’s revenue requirement and to make a filing by mid-March 2018 regarding the Act’s effects on Entergy New Orleans’s operating income and rate base and potential mechanisms for customers to receive benefits of the Act. The resolution also directed Entergy New Orleans to request that Entergy Services file with the FERC for revisions of the Unit Power Sales Agreement and MSS-4 replacement tariffs to address the return of excess accumulated deferred income taxes. Entergy plans to make such filings with the FERC by the end of March 2018.
After enactment of the Tax Cuts and Jobs Act the PUCT issued an order requiring most utilities, including Entergy Texas, beginning January 25, 2018, to record a regulatory liability for the difference between revenues collected under existing rates and revenues that would have been collected had existing rates been set using the new federal income tax rates and also for the balance of excess accumulated deferred income taxes. The order also directs the PUCT staff to investigate each investor-owned utility on a case-by-case basis to determine the appropriate mechanism to adjust its rates to reflect the changes under the Act. In both a memorandum issued prior to the open meeting when the order was discussed and during the discussions at the open meeting discussing the order, the PUCT indicated that it would consider utility earnings in determining the treatment of the liability and the effects of the Act. Entergy Texas had previously provided information to the PUCT Staff in the docket and stated that it expects the PUCT to address the lower tax expense as part of Entergy Texas’s rate case expected to be filed in May 2018. Entergy Texas also stated that it would be inappropriate for the PUCT to require a refund of the reduction in income tax expense in 2018 resulting from the Act on a retroactive basis and without a comprehensive review of Entergy Texas’s cost of service and earned return on equity. In a subsequent order issued following the February 2018 open meeting, the PUCT clarified that carrying costs need not be recorded as part of the regulatory liability.

The Registrant Subsidiaries will continue to work with their respective regulators to determine the appropriate path forward in each jurisdiction regarding the effects of the Act.

Fuel and purchased power cost recovery

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas are allowed to recover fuel and purchased power costs through fuel mechanisms included in electric and gas rates that are recorded as fuel cost recovery revenues.  The difference between revenues collected and the current fuel and purchased power costs is generally recorded as “Deferred fuel costs” on the Utility operating companies’ financial statements.  The table below shows the amount of deferred fuel costs as of December 31, 2017 and 2016 that Entergy expects to recover (or return to customers) through fuel mechanisms, subject to subsequent regulatory review.
 
2017
 
2016
 
(In Millions)
Entergy Arkansas (a)

$130.4

 

$163.6

Entergy Louisiana (b)

$96.7

 

$119.9

Entergy Mississippi

$32.4

 

$7.0

Entergy New Orleans (b)

($3.7
)
 

$8.9

Entergy Texas

($67.3
)
 

($54.5
)

(a)
Includes $67.1 million in 2017 and $66.9 million in 2016 of fuel and purchased power costs, which do not currently earn a return on investment and whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.
(b)
Includes $168.1 million in each year for Entergy Louisiana and $4.1 million in each year for Entergy New Orleans of fuel, purchased power, and capacity costs, which do not currently earn a return on investment and whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.

Entergy Arkansas

Production Cost Allocation Rider

The APSC approved a production cost allocation rider for recovery from customers of the retail portion of the costs allocated to Entergy Arkansas as a result of the System Agreement proceedings, which are discussed in the “System Agreement Cost Equalization Proceedings” section below.  These costs cause an increase in Entergy Arkansas’s deferred fuel cost balance because Entergy Arkansas pays the costs over seven months but collects the costs from customers over twelve months.

In May 2014, Entergy Arkansas filed its annual redetermination of the production cost allocation rider to recover the $3 million unrecovered retail balance as of December 31, 2013 and the $67.8 million System Agreement bandwidth remedy payment made in May 2014 as a result of the compliance filing pursuant to the FERC’s February 2014 orders related to the bandwidth payments/receipts for the June - December 2005 period. In January 2015 the APSC issued an order approving Entergy Arkansas’s request for recovery of the $3 million under-recovered amount based on the true-up of the production cost allocation rider and the $67.8 million May 2014 System Agreement bandwidth remedy payment subject to refund with interest, with recovery of these payments concluding with the last billing cycle in December 2015. The APSC also found that Entergy Arkansas is entitled to carrying charges pursuant to the current terms of the production cost allocation rider. Entergy Arkansas made its compliance filing pursuant to the order in January 2015 and the APSC issued its approval order, also in January 2015. The redetermined rate went into effect with the first billing cycle of February 2015.

In May 2015, Entergy Arkansas filed its annual redetermination of the production cost allocation rider, which included a $38 million payment made by Entergy Arkansas as a result of the FERC’s February 2014 order related to the comprehensive bandwidth recalculation for calendar year 2006, 2007, and 2008 production costs. The redetermined rate for the 2015 production cost allocation rider update was added to the redetermined rate from the 2014 production cost allocation rider update and the combined rate was effective with the first billing cycle of July 2015. This combined rate was effective through December 2015. The collection of the remainder of the redetermined rate for the 2015 production cost allocation rider update continued through June 2016.

In May 2016, Entergy Arkansas filed its annual redetermination pursuant to the production cost allocation rider, which reflected recovery of the production cost allocation rider true-up adjustment of the 2014 and 2015 unrecovered retail balance in the amount of $1.9 million. Additionally, the redetermined rates reflected the recovery of a $1.9 million System Agreement bandwidth remedy payment resulting from a compliance filing pursuant to the FERC’s December 2015 order related to test year 2009 production costs. The rates for the 2016 production cost allocation rider update became effective with the first billing cycle of July 2016, and the rates were effective through June 2017.

In May 2017, Entergy Arkansas filed its annual redetermination pursuant to the production cost allocation rider, which reflected a credit amount of $0.3 million resulting from a compliance filing pursuant to the FERC’s September 2016 order. Additionally, the redetermined rate reflected recovery of the production cost allocation rider true-up adjustment of the 2016 unrecovered retail balance in the amount of $0.3 million. Because of the small effect of the 2017 production cost allocation rider update, Entergy Arkansas proposed to reduce the effective period of the update to one month, July 2017. After the one month collection period, rates were set to zero for all rate classes for the period August 2017 through June 2018.

Energy Cost Recovery Rider

Entergy Arkansas’s retail rates include an energy cost recovery rider to recover fuel and purchased energy costs in monthly customer bills.  The rider utilizes the prior calendar-year energy costs and projected energy sales for the twelve-month period commencing on April 1 of each year to develop an energy cost rate, which is redetermined annually and includes a true-up adjustment reflecting the over- or under-recovery, including carrying charges, of the energy costs for the prior calendar year.  The energy cost recovery rider tariff also allows an interim rate request depending upon the level of over- or under-recovery of fuel and purchased energy costs.

In January 2014, Entergy Arkansas filed a motion with the APSC relating to its redetermination of its energy cost rate that was subsequently filed in March 2014. In that motion, Entergy Arkansas requested that the APSC authorize Entergy Arkansas to exclude $65.9 million of deferred fuel and purchased energy costs incurred in 2013 from the redetermination of its 2014 energy cost rate. The $65.9 million is an estimate of the incremental fuel and replacement energy costs that Entergy Arkansas incurred as a result of the ANO stator incident. Entergy Arkansas requested that the APSC authorize Entergy Arkansas to retain that amount in its deferred fuel balance, with recovery to be reviewed in a later period after more information is available regarding various claims associated with the ANO stator incident. The APSC approved Entergy Arkansas’s request in February 2014. In July 2017, Entergy Arkansas filed for a change in rates pursuant to its formula rate plan rider. In that docket, the APSC approved a settlement agreement agreed upon by the parties, including a provision that requires Entergy Arkansas to initiate a docket for the purpose of recovering funds currently withheld from rates and related to the stator incident, including the $65.9 million of deferred fuel and purchased energy costs previously noted, subject to certain timelines and conditions set forth in the settlement agreement. See the “ANO Damage, Outage, and NRC Reviews” section in Note 8 to the financial statements for further discussion of the ANO stator incident.

In March 2017, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01164 per kWh to $0.01547 per kWh. The APSC staff filed testimony in March 2017 recommending that the redetermined rate be implemented with the first billing cycle of April 2017 under the normal operation of the tariff. Accordingly, the redetermined rate went into effect on March 31, 2017 pursuant to the tariff. In July 2017 the Arkansas Attorney General requested additional information to support certain of the costs included in Entergy Arkansas’s 2017 energy cost rate redetermination.

Entergy Louisiana

Entergy Louisiana recovers electric fuel and purchased power costs for the billing month based upon the level of such costs incurred two months prior to the billing month. Entergy Louisiana’s purchased gas adjustments include estimates for the billing month adjusted by a surcharge or credit that arises from an annual reconciliation of fuel costs incurred with fuel cost revenues billed to customers, including carrying charges.

In April 2010 the LPSC authorized its staff to initiate an audit of Entergy Louisiana’s fuel adjustment clause filings.  The audit included a review of the reasonableness of charges flowed through the fuel adjustment clause by Entergy Louisiana for the period from 2005 through 2009.  The LPSC staff issued its audit report in January 2013.  The LPSC staff recommended that Entergy Louisiana refund approximately $1.9 million, plus interest, to customers and realign the recovery of approximately $1 million from Entergy Louisiana’s fuel adjustment clause to base rates.  The recommended refund was made by Entergy Louisiana in May 2013 in the form of a credit to customers through its fuel adjustment clause filing. In October 2016 the LPSC staff filed testimony affirming the recommendation in its audit report on the lone remaining issue that nuclear dry fuel storage costs should be realigned to base rates. The parties agreed to remove that remaining issue to a separate docket because the same issue was outstanding in the Entergy Gulf States Louisiana audit for the same time period. In November 2016 the LPSC approved the resolution of this audit and the creation of a new docket for the resolution of the proper method of recovery for nuclear dry fuel storage costs. In December 2016 the LPSC opened a new docket in order to resolve the issue regarding the proper methodology for the recovery of nuclear dry fuel storage costs. In October 2017 the LPSC approved the continued recovery of the nuclear dry fuel storage costs through the fuel adjustment clause, resolving the open issue in the audit.

In December 2011 the LPSC authorized its staff to initiate a proceeding to audit the fuel adjustment clause filings of Entergy Gulf States Louisiana and its affiliates.  The audit included a review of the reasonableness of charges flowed by Entergy Gulf States Louisiana through its fuel adjustment clause for the period 2005 through 2009.  In March 2016 the LPSC staff consultant issued its audit report. In its report, the LPSC staff consultant recommended that Entergy Louisiana refund approximately $8.6 million, plus interest, to customers and realign the recovery of approximately $12.7 million from Entergy Gulf States Louisiana’s fuel adjustment clause to base rates. In September 2016 the LPSC staff filed testimony stating that it was no longer recommending a disallowance of $3.4 million of the $8.6 million discussed above, but otherwise maintained positions from its report. Subsequently, the parties entered into a settlement, which was approved by the LPSC in November 2016. The settlement recognized the dry cask storage recovery method issue, which was addressed in the separate proceeding approved by the LPSC in October 2017, provided for a refund of $5 million, which was made to legacy Entergy Gulf States Louisiana customers in December 2016, and resolved all other issues raised in the audit.
In July 2014 the LPSC authorized its staff to initiate an audit of Entergy Gulf States Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed by Entergy Gulf States Louisiana through its fuel adjustment clause for the period from 2010 through 2013. Discovery commenced in July 2015. No report of audit has been issued.

In July 2014 the LPSC authorized its staff to initiate an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed by Entergy Louisiana through its fuel adjustment clause for the period from 2010 through 2013. Discovery commenced in July 2015. No report of audit has been issued.

In June 2016 the LPSC staff provided notice of audits of Entergy Louisiana’s fuel adjustment clause filings and purchased gas adjustment clause filings. In recognition of the business combination that occurred in 2015, the audit notice was issued to Entergy Louisiana and will also include a review of charges to legacy Entergy Gulf States Louisiana customers prior to the business combination. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s fuel adjustment clause for the period from 2014 through 2015 and charges flowed through Entergy Louisiana’s purchased gas adjustment clause for the period from 2012 through 2015. Discovery commenced in March 2017. No report of audit has been issued.

Due to higher fuel costs for the operating month of January 2018 resulting in part from recent cold weather, higher Henry Hub prices, and an increase in total fuel and purchased power costs, Entergy Louisiana plans to cap the average fuel adjustment charge to be billed in March 2018 at $0.03060 per kWh and to defer billing of all fuel costs in excess of the capped amounts by including such costs in the over- or under-recovery account.

Entergy Mississippi

Entergy Mississippi’s rate schedules include an energy cost recovery rider that is adjusted annually to reflect accumulated over- or under-recoveries.  Entergy Mississippi’s fuel cost recoveries are subject to annual audits conducted pursuant to the authority of the MPSC.

Entergy Mississippi had a deferred fuel over-recovery balance of $58.3 million as of May 31, 2015, along with an under-recovery balance of $12.3 million under the power management rider. Pursuant to those tariffs, in July 2015, Entergy Mississippi filed for interim adjustments under both the energy cost recovery rider and the power management rider to flow through to customers the approximately $46 million net over-recovery over a six-month period. In August 2015, the MPSC approved the interim adjustments effective with September 2015 bills. In November 2015, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included a projected over-recovery balance of $48 million projected through January 31, 2016. In January 2016 the MPSC approved the redetermined annual factor effective February 1, 2016. The MPSC further ordered, however, that due to the significant change in natural gas price forecasts since Entergy Mississippi’s filing in November 2015 Entergy Mississippi should file a revised fuel factor with the MPSC no later than February 1, 2016. Pursuant to that order, Entergy Mississippi submitted a revised fuel factor. Additionally, because Entergy Mississippi’s projected over-recovery balance for the period ending January 31, 2016 was $68 million, in February 2016, Entergy Mississippi filed for another interim adjustment to the energy cost factor effective April 2016 to flow through to customers the projected over-recovery balance over a six-month period. That interim adjustment was approved by the MPSC in February 2016 effective for April 2016 bills.

In November 2016, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an over-recovery of less than $2 million as of September 30, 2016. In January 2017 the MPSC approved the annual factor effective with February 2017 bills. Also in January 2017 the MPSC certified to the Mississippi Legislature the audit reports of its independent auditors for the fuel year ending September 30, 2016. In its order, the MPSC expressly reserved the right to review and determine the recoverability of any and all purchased power expenditures made during fiscal year 2016. The MPSC hired independent auditors to conduct an annual operations audit and a financial audit. The independent auditors issued their audit reports in December 2017. The audit reports included several recommendations for action by Entergy Mississippi but did not recommend any cost disallowances. In January 2018 the MPSC certified the audit reports to the Mississippi Legislature. In November 2017 the Public Utilities Staff separately engaged a consultant to review the outage at the Grand Gulf Nuclear Station that began in 2016. The review is currently in progress.

In November 2017, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an under-recovery of approximately $61.5 million as of September 30, 2017. Entergy Mississippi proposed a two-tiered energy cost factor designed to promote overall rate stability throughout 2018 particularly during the summer months. In January 2018 the MPSC approved the proposed energy cost factors effective for February 2018 bills.

Mississippi Attorney General Complaint

The Mississippi attorney general filed a complaint in state court in December 2008 against Entergy Corporation, Entergy Mississippi, Entergy Services, and Entergy Power alleging, among other things, violations of Mississippi statutes, fraud, and breach of good faith and fair dealing, and requesting an accounting and restitution.  The complaint is wide ranging and relates to tariffs and procedures under which Entergy Mississippi purchases power not generated in Mississippi to meet electricity demand.  Entergy believes the complaint is unfounded.  In December 2008 the defendant Entergy companies removed the Attorney General’s lawsuit to U.S. District Court in Jackson, Mississippi.  The Mississippi attorney general moved to remand the matter to state court.  In August 2012 the District Court issued an opinion denying the Attorney General’s motion for remand, finding that the District Court has subject matter jurisdiction under the Class Action Fairness Act.

The defendant Entergy companies answered the complaint and filed a counterclaim for relief based upon the Mississippi Public Utilities Act and the Federal Power Act.  In May 2009 the defendant Entergy companies filed a motion for judgment on the pleadings asserting grounds of federal preemption, the exclusive jurisdiction of the MPSC, and factual errors in the Attorney General’s complaint.  In September 2012 the District Court heard oral argument on Entergy’s motion for judgment on the pleadings.

In January 2014 the U.S. Supreme Court issued a decision in which it held that cases brought by attorneys general as the sole plaintiff to enforce state laws were not considered “mass actions” under the Class Action Fairness Act, so as to establish federal subject matter jurisdiction. One day later the Attorney General renewed his motion to remand the Entergy case back to state court, citing the U.S. Supreme Court’s decision. The defendant Entergy companies responded to that motion reiterating the additional grounds asserted for federal question jurisdiction, and the District Court held oral argument on the renewed motion to remand in February 2014. In April 2015 the District Court entered an order denying the renewed motion to remand, holding that the District Court has federal question subject matter jurisdiction. The Attorney General appealed to the U.S. Fifth Circuit Court of Appeals the denial of the motion to remand. In July 2015 the Fifth Circuit issued an order denying the appeal, and the Attorney General subsequently filed a petition for rehearing of the request for interlocutory appeal, which was also denied. In December 2015 the District Court ordered that the parties submit to the court undisputed and disputed facts that are material to the Entergy defendants’ motion for judgment on the pleadings, as well as supplemental briefs regarding the same. Those filings were made in January 2016.

In September 2016 the Attorney General filed a mandamus petition with the U.S. Fifth Circuit Court of Appeals in which the Attorney General asked the Fifth Circuit to order the chief judge to reassign this case to another judge. In September 2016 the District Court denied the Entergy companies’ motion for judgment on the pleadings. The Entergy companies filed a motion seeking to amend the District Court’s order denying the Entergy companies’ motion for judgment on the pleadings and allowing an interlocutory appeal. In October 2016 the Fifth Circuit granted the Attorney General’s motion for writ of mandamus and directed the chief judge to assign the case to a new judge. The case was reassigned in October 2016. In January 2017 the District Court denied the Entergy companies’ motion to amend the order denying the motion for judgment on the pleadings. In June 2017 the District Court issued a case management order setting a trial date in November 2018. Discovery is currently in progress.
Entergy New Orleans

Entergy New Orleans’s electric rate schedules include a fuel adjustment tariff designed to reflect no more than targeted fuel and purchased power costs, adjusted by a surcharge or credit for deferred fuel expense arising from the monthly reconciliation of actual fuel and purchased power costs incurred with fuel cost revenues billed to customers, including carrying charges.
 
Entergy New Orleans’s gas rate schedules include a purchased gas adjustment to reflect estimated gas costs for the billing month, adjusted by a surcharge or credit similar to that included in the electric fuel adjustment clause, including carrying charges.

Due to higher fuel costs associated in part with the extended Grand Gulf outage and the partially simultaneous Union Power Block 1 planned outage, for the December 2016, January 2017, and February 2017 billing months, the City Council authorized Entergy New Orleans to cap the fuel adjustment charge billed to customers at $0.035 per kWh and to defer billing of all fuel costs in excess of the capped amount by including such costs in the over- or under-recovery account.

Due to higher fuel costs for the operating month of January 2018 resulting in part from recent cold weather, higher Henry Hub prices, and an increase in total fuel and purchased power costs associated in part with certain plant outages, Entergy New Orleans has proposed to cap the fuel adjustment charge to be billed in March 2018 to non-transmission Entergy New Orleans legacy customers and Entergy New Orleans Algiers customers at $0.035323 per kWh and $0.025446 per kWh, respectively. Entergy New Orleans has also proposed to cap the fuel adjustment charge to be billed in March 2018 for Entergy New Orleans legacy transmission customers at $0.034609 per kWh and to defer billing of all fuel costs in excess of the capped amount by including such costs in the over- or under-recovery account.

Entergy Texas

Entergy Texas’s rate schedules include a fixed fuel factor to recover fuel and purchased power costs, including interest, not recovered in base rates.   Semi-annual revisions of the fixed fuel factor are made in March and September based on the market price of natural gas and changes in fuel mix.  The amounts collected under Entergy Texas’s fixed fuel factor and any interim surcharge or refund are subject to fuel reconciliation proceedings before the PUCT.
        
In August 2014, Entergy Texas filed an application seeking PUCT approval to implement an interim fuel refund of approximately $24.6 million for over-collected fuel costs incurred during the months of November 2012 through April 2014. This refund resulted from (i) applying $48.6 million in bandwidth remedy payments that Entergy Texas received in May 2014 related to the June - December 2005 period to Entergy Texas’s $8.7 million under-recovered fuel balance as of April 30, 2014 and (ii) netting that fuel balance against the $15.3 million bandwidth remedy payment that Entergy Texas made related to calendar year 2013 production costs. Also in August 2014, Entergy Texas filed an unopposed motion for interim rates to implement these refunds for most customers over a two-month period commencing with September 2014. The PUCT issued its order approving the interim relief in August 2014 and Entergy Texas completed the refunds in October 2014. Parties intervened in this matter, and all parties agreed that the proceeding should be bifurcated such that the proposed interim refund would become final in a separate proceeding, which refund was approved by the PUCT in March 2015.   In July 2015 certain parties filed briefs in the open proceeding asserting that Entergy Texas should refund to retail customers an additional $10.9 million in bandwidth remedy payments Entergy Texas received related to calendar year 2006 production costs.  In October 2015 an ALJ issued a proposal for decision recommending that the additional $10.9 million in bandwidth remedy payments be refunded to retail customers. In January 2016 the PUCT issued its order affirming the ALJ’s recommendation, and Entergy Texas filed a motion for rehearing of the PUCT’s decision, which the PUCT denied. In March 2016, Entergy Texas filed a complaint in Federal District Court for the Western District of Texas and a petition in the Travis County (State) District Court appealing the PUCT’s decision. The pending appeals did not stay the PUCT’s decision. In April 2016, Entergy Texas filed with the PUCT an application to refund to customers approximately $56.2 million. The refund resulted from (i) $41.8 million of fuel cost recovery over-collections through February 2016, (ii) the $10.9 million in bandwidth remedy payments, discussed above, that Entergy Texas received related to calendar year 2006 production costs, and (iii) $3.5 million in bandwidth remedy payments that Entergy Texas received related to 2006-2008 production costs. In June 2016, Entergy Texas filed an unopposed settlement agreement that added additional over-recovered fuel costs for the months of March and April 2016. The settlement resulted in a $68 million refund. The ALJ approved the refund on an interim basis to be made to most customers over a four-month period beginning with the first billing cycle of July 2016. In July 2016 the PUCT issued an order approving the interim refund. The federal appeal of the PUCT’s January 2016 decision was heard in December 2016, and the Federal District Court granted Entergy Texas’s requested relief. In January 2017 the PUCT and an intervenor filed petitions for appeal to the U.S. Court of Appeals for the Fifth Circuit of the Federal District Court ruling. Oral argument was held before the U.S. Court of Appeals for the Fifth Circuit in February 2018, and a decision is pending. The State District Court appeal of the PUCT’s January 2016 decision also remains pending.

In July 2016, Entergy Texas filed an application to reconcile its fuel and purchased power costs for the period April 1, 2013 through March 31, 2016. Under a recent PUCT rule change, a fuel reconciliation is required to be filed at least once every three years and outside of a base rate case filing. During the reconciliation period, Entergy Texas incurred approximately $1.77 billion in Texas jurisdictional eligible fuel and purchased power expenses, net of certain revenues credited to such expenses and other adjustments. Entergy Texas estimated an over-recovery balance of approximately $19.3 million, including interest, which Entergy Texas requested authority to carry over as the beginning balance for the subsequent reconciliation period beginning Apri1 2016. Entergy Texas also noted, however, that the estimated $19.3 million over collection was being refunded to customers as a portion of the interim fuel refund beginning with the first billing cycle of July 2016, discussed above. Entergy Texas also requested a prudence finding for each of the fuel-related contracts and arrangements entered into or modified during the reconciliation period that have not been reviewed by the PUCT in a prior proceeding. In December 2016, Entergy Texas entered into a stipulation and settlement agreement resulting in a $6 million disallowance not associated with any particular issue raised and a refund of the over-recovery balance of $21 million as of November 30, 2016, to most customers beginning April 2017 through June 2017. This settlement was developed concurrently with the stipulation and settlement agreement in the 2016 transmission cost recovery factor rider amendment discussed below, and the terms and conditions in both settlements are interdependent. The fuel reconciliation settlement was approved by the PUCT in March 2017 and the refunds were made.

In June 2017, Entergy Texas filed an application for a fuel refund of approximately $30.7 million for the months of December 2016 through April 2017. For most customers, the refunds flowed through bills for the months of July 2017 through September 2017. The fuel refund was approved by the PUCT in August 2017.

In December 2017, Entergy Texas filed an application for a fuel refund of approximately $30.5 million for the months of May 2017 through October 2017. Also in December 2017, the PUCT’s ALJ approved the refund on an interim basis. For most customers, the refunds flowed through bills beginning January 2018 and will continue through March 2018. A final decision in this matter remains pending.
    
Retail Rate Proceedings

Filings with the APSC (Entergy Arkansas)

Retail Rates

2015 Base Rate Filing
 
In April 2015, Entergy Arkansas filed with the APSC for a general change in rates, charges, and tariffs. The filing notified the APSC of Entergy Arkansas’s intent to implement a forward test year formula rate plan pursuant to Arkansas legislation passed in 2015, and requested a retail rate increase of $268.4 million, with a net increase in revenue of $167 million. The filing requested a 10.2% return on common equity. In September 2015 the APSC staff and intervenors filed direct testimony, with the APSC staff recommending a revenue requirement of $217.9 million and a 9.65% return on common equity. In December 2015, Entergy Arkansas, the APSC staff, and certain of the intervenors in the rate case filed with the APSC a joint motion for approval of a settlement of the case that proposed a retail rate increase of approximately $225 million with a net increase in revenue of approximately $133 million; an authorized return on common equity of 9.75%; and a formula rate plan tariff that provides a +/- 50 basis point band around the 9.75% allowed return on common equity. A significant portion of the rate increase is related to Entergy Arkansas’s acquisition in March 2016 of Union Power Station Power Block 2 for a base purchase price of $237 million. The settlement agreement also provided for amortization over a 10-year period of $7.7 million of previously-incurred costs related to ANO post-Fukushima compliance and $9.9 million of previously-incurred costs related to ANO flood barrier compliance. A settlement hearing was held in January 2016. In February 2016 the APSC approved the settlement with one exception that reduced the retail rate increase proposed in the settlement by $5 million. The settling parties agreed to the APSC modifications in February 2016. The new rates were effective February 24, 2016 and began billing with the first billing cycle of April 2016. In March 2016, Entergy Arkansas made a compliance filing regarding the new rates that included an interim base rate adjustment surcharge, effective with the first billing cycle of April 2016, to recover the incremental revenue requirement for the period February 24, 2016 through March 31, 2016. The interim base rate adjustment surcharge was designed to recover a total of $21.1 million over the nine-month period from April 2016 through December 2016.

2016 Formula Rate Plan Filing
    
In July 2016, Entergy Arkansas filed with the APSC its 2016 formula rate plan filing showing Entergy Arkansas’s projected earned return on common equity for the twelve months ended December 31, 2017 test period to be below the formula rate plan bandwidth. The filing requested a $67.7 million revenue requirement increase to achieve Entergy Arkansas’s target earned return on common equity of 9.75%. In October 2016, Entergy Arkansas filed with the APSC revised formula rate plan attachments with an updated request for a $54.4 million revenue requirement increase based on acceptance of certain adjustments and recommendations made by the APSC staff and other intervenors, as well as three additional adjustments identified as appropriate by Entergy Arkansas. In November 2016 a hearing was held and the APSC issued an order directing the parties to brief certain issues. In December 2016 the APSC approved the settlement agreement and the $54.4 million revenue requirement increase with approximately $25 million of the $54.4 million revenue requirement subject to possible future adjustment and refund to customers with interest. The APSC requested supplemental information for some of Entergy Arkansas’s requested nuclear expenditures. In December 2016 the APSC approved Entergy Arkansas’s formula rate plan compliance tariff, and the rates became effective with the first billing cycle of January 2017. In April 2017, Entergy Arkansas filed a motion consented to by all parties requesting that it be permitted to submit the supplemental information requested by the APSC in conjunction with its 2017 formula rate plan filing, which was subsequently made in July 2017 and is discussed below. In May 2017 the APSC approved the joint motion and proposal to review Entergy Arkansas’s supplemental information on a concurrent schedule with the 2017 formula rate plan filing. In October 2017, Entergy Arkansas and the parties to the proceeding filed a joint motion to approve a unanimous settlement agreement resolving all issues in the docket and providing for recovery of the 2017 and 2018 nuclear costs. In December 2017 the APSC approved the settlement agreement and recovery of the 2017 and 2018 nuclear costs.

2017 Formula Rate Plan Filing

In July 2017, Entergy Arkansas filed with the APSC its 2017 formula rate plan filing showing Entergy Arkansas’s projected earned return on common equity for the twelve months ended December 31, 2018 test period to be below the formula rate plan bandwidth.  The filing projected a $129.7 million revenue requirement increase to achieve Entergy Arkansas’s target earned return on common equity of 9.75%.  Entergy Arkansas’s formula rate plan is subject to a four percent annual revenue constraint and the projected annual revenue requirement increase exceeded the four percent, resulting in a proposed increase for the 2017 formula rate plan of $70.9 million. In October 2017, Entergy Arkansas filed with the APSC revised formula rate plan attachments that projected a $126.2 million revenue requirement increase based on acceptance of certain adjustments and recommendations made by the APSC staff and other intervenors. The revised formula rate plan filing included a proposed $71.1 million revenue requirement increase based on a revision to the four percent constraint calculation. In October 2017, Entergy Arkansas and the parties to the proceeding filed a joint motion to approve a unanimous settlement agreement resolving all issues in the docket and providing for recovery of the 2017 and 2018 nuclear costs. In December 2017 the APSC approved the settlement agreement and the $71.1 million revenue requirement increase, as well as Entergy Arkansas’s formula rate plan compliance tariff, and the rates became effective with the first billing cycle of January 2018.
 
Internal Restructuring

In November 2017, Entergy Arkansas filed an application with the APSC seeking authorization to undertake a restructuring that would result in the transfer of substantially all of the assets and operations of Entergy Arkansas to a new entity, which would ultimately be owned by an existing Entergy subsidiary holding company. The restructuring is subject to regulatory review and approval by the APSC, the FERC, and the NRC. Entergy Arkansas also filed a notice with the Missouri Public Service Commission in December 2017 out of an abundance of caution, although Entergy Arkansas does not serve any retail customers in Missouri. If the APSC approves the restructuring by September 1, 2018, and the restructuring closes on or before December 1, 2018, Entergy Arkansas proposed in its application to credit retail customers $66 million over six years, beginning in 2019. In February 2018, Entergy Arkansas filed supplemental testimony reducing the proposed retail customer credits to $39.6 million over six years. If the APSC, the FERC, and the NRC approvals are obtained, Entergy Arkansas expects the restructuring will be consummated on or before December 1, 2018.
It is currently contemplated that Entergy Arkansas would undertake a multi-step restructuring, which would include the following:
Entergy Arkansas would redeem its outstanding preferred stock at the aggregate redemption price of approximately $32.7 million, which includes call premiums, plus accumulated and unpaid dividends, if any.
Entergy Arkansas would convert from an Arkansas corporation to a Texas corporation.
Under the Texas Business Organizations Code (TXBOC), Entergy Arkansas will allocate substantially all of its assets to a new subsidiary, Entergy Arkansas Power, LLC, a Texas limited liability company (Entergy Arkansas Power), and Entergy Arkansas Power will assume substantially all of the liabilities of Entergy Arkansas, in a transaction regarded as a merger under the TXBOC. Entergy Arkansas will remain in existence and hold the membership interests in Entergy Arkansas Power.
Entergy Arkansas will contribute the membership interests in Entergy Arkansas Power to an affiliate (Entergy Utility Holding Company, LLC, a Texas limited liability company and subsidiary of Entergy Corporation). As a result of the contribution, Entergy Arkansas Power will be a wholly-owned subsidiary of Entergy Utility Holding Company, LLC.
Entergy Arkansas will change its name to Entergy Utility Property, Inc., and Entergy Arkansas Power will then change its name to Entergy Arkansas, LLC.

Upon the completion of the restructuring, Entergy Arkansas, LLC will hold substantially all of the assets, and will have assumed substantially all of the liabilities, of Entergy Arkansas. Entergy Arkansas may modify or supplement the steps to be taken to effectuate the restructuring.
Filings with the LPSC (Entergy Louisiana)

Retail Rates - Electric

2014 Formula Rate Plan Filing

In connection with the approval of the business combination of Entergy Gulf States Louisiana and Entergy Louisiana, the LPSC authorized the filing of a single, joint, formula rate plan evaluation report for Entergy Gulf States Louisiana’s and Entergy Louisiana’s 2014 calendar year operations. The joint evaluation report was filed in September 2015 and reflected an earned return on common equity of 9.09%. As such, no adjustment to base formula rate plan revenue was required. The following adjustments were required under the formula rate plan, however: a decrease in the additional capacity mechanism for Entergy Louisiana of $17.8 million; an increase in the additional capacity mechanism for Entergy Gulf States Louisiana of $4.3 million; and a reduction of $5.5 million to the MISO cost recovery mechanism to collect approximately $35.7 million on a combined-company basis. Under the order approving the business combination, following completion of the prescribed review period, rates were implemented with the first billing cycle of December 2015, subject to refund. See “Entergy Louisiana and Entergy Gulf States Louisiana Business Combination” below for further discussion of the business combination. In June 2017 the LPSC staff and Entergy Louisiana filed an unopposed joint report of proceedings, which was accepted by the LPSC in June 2017, finalizing the results of this proceeding with no changes to rates already implemented.

2015 Formula Rate Plan Filing

In May 2016, Entergy Louisiana filed its formula rate plan evaluation report for its 2015 calendar year operations. The evaluation report reflected an earned return on common equity of 9.07%. As such, no adjustment to base formula rate plan revenue was required. The following other adjustments, however, were required under the formula rate plan: an increase in the legacy Entergy Louisiana additional capacity mechanism of $14.2 million; a separate increase in legacy Entergy Louisiana revenue of $10 million primarily to reflect the effects of the termination of the System Agreement; an increase in the legacy Entergy Gulf States Louisiana additional capacity mechanism of $0.5 million; a decrease in legacy Entergy Gulf States Louisiana revenue of $58.7 million primarily to reflect the effects of the termination of the System Agreement; and an increase of $11 million to the MISO cost recovery mechanism. Rates were implemented with the first billing cycle of September 2016, subject to refund. Following implementation of the as-filed rates in September 2016, there were several interim updates to Entergy Louisiana’s formula rate plan, including the one submitted in December 2016, reflecting implementation of the settlement of the Waterford 3 replacement steam generator project prudence review described below. In June 2017 the LPSC staff and Entergy Louisiana filed a joint report of proceedings, which was accepted by the LPSC in June 2017, finalizing the results of the May 2016 evaluation report, interim updates, and corresponding proceedings with no changes to rates already implemented.

Extension of MISO Cost Recovery Mechanism Rider

In November 2016, Entergy Louisiana filed with the LPSC a request to extend the MISO cost recovery mechanism rider provision of its formula rate plan. In March 2017 the LPSC staff submitted direct testimony generally supportive of a one-year extension of the MISO cost recovery mechanism and the intervenor in the proceeding did not oppose an extension for this period of time. In July 2017 an uncontested joint stipulation authorizing a one-year extension of the MISO cost recovery mechanism rider was approved.

2016 Formula Rate Plan Filing

In May 2017, Entergy Louisiana filed its formula rate plan evaluation report for its 2016 calendar year operations. The evaluation report reflected an earned return on common equity of 9.84%. As such, no adjustment to base formula rate plan revenue was required. Adjustments, however, were required under the formula rate plan; the 2016 formula rate plan evaluation report showed a decrease in formula rate plan revenue of approximately $16.9 million, comprised of a decrease in legacy Entergy Louisiana formula rate plan revenue of $3.5 million, a decrease in legacy Entergy Gulf States Louisiana formula rate plan revenue of $9.7 million, and a decrease in incremental formula rate plan revenue of $3.7 million. Additionally, the formula rate plan evaluation report called for a decrease of $40.5 million in the MISO cost recovery revenue requirement from the present level of $46.8 million to $6.3 million. Rates reflecting these adjustments were implemented with the first billing cycle of September 2017, subject to refund. In September 2017 the LPSC issued its report indicating that no changes to Entergy Louisiana’s original formula rate plan evaluation report were required but reserved for several issues, including Entergy Louisiana’s September 2017 update to its formula rate plan evaluation report.

Formula Rate Plan Extension Request

In August 2017, Entergy Louisiana filed a request with the LPSC seeking to extend its formula rate plan for three years (2017-2019) with limited modifications to its terms.  Those modifications include: a one-time resetting of base rates to the midpoint of the band at Entergy Louisiana’s authorized return on equity of 9.95% for the 2017 test year; narrowing of the formula rate plan bandwidth from a total of 160 basis points to 80 basis points; and a forward-looking mechanism that would allow Entergy Louisiana to recover certain transmission-related costs contemporaneously with when those projects begin delivering benefits to customers.  Entergy Louisiana requested that the LPSC consider its request on an expedited basis, in an effort to maintain Entergy Louisiana’s current cycle for implementing rate adjustments, i.e., September 2018, without the need for filing a full base rate case proceeding. Several parties have intervened in the proceeding and all parties have been participating in settlement discussions.

Waterford 3 Replacement Steam Generator Project

Following the completion of the Waterford 3 replacement steam generator project, the LPSC undertook a prudence review in connection with a filing made by Entergy Louisiana in April 2013 with regard to the following aspects of the replacement project: 1) project management; 2) cost controls; 3) success in achieving stated objectives; 4) the costs of the replacement project; and 5) the outage length and replacement power costs. In July 2014 the LPSC staff filed testimony recommending potential project and replacement power cost disallowances of up to $71 million, citing a need for further explanation or documentation from Entergy Louisiana.  An intervenor filed testimony recommending disallowance of $141 million of incremental project costs, claiming the steam generator fabricator was imprudent.  Entergy Louisiana provided further documentation and explanation requested by the LPSC staff. An evidentiary hearing was held in December 2014. At the hearing the parties maintained the positions reflected in pre-filed testimony. Entergy Louisiana believed that the replacement steam generator costs were prudently incurred and applicable legal principles supported their recovery in rates.  Nevertheless, Entergy Louisiana recorded a write-off of $16 million of Waterford 3’s plant balance in December 2014 because of the uncertainty at the time associated with the resolution of the prudence review. In December 2015 the ALJ issued a proposed recommendation, which was subsequently finalized, concluding that Entergy Louisiana prudently managed the Waterford 3 replacement steam generator project, including the selection, use, and oversight of contractors, and could not reasonably have anticipated the damage to the steam generators. Nevertheless, the ALJ concluded that Entergy Louisiana was liable for the conduct of its contractor and subcontractor and, therefore, recommended a disallowance of $67 million in capital costs. Additionally, the ALJ concluded that Entergy Louisiana did not sufficiently justify the incurrence of $2 million in replacement power costs during the replacement outage. Although the ALJ’s recommendation had not yet been considered by the LPSC, after considering the progress of the proceeding in light of the ALJ recommendation, Entergy Louisiana recorded in the fourth quarter 2015 approximately $77 million in charges, including a $45 million asset write-off and a $32 million regulatory charge, to reflect that a portion of the assets associated with the Waterford 3 replacement steam generator project was no longer probable of recovery. Entergy Louisiana maintained that the ALJ’s recommendation contained significant factual and legal errors.

In October 2016 the parties reached a settlement in this matter. The settlement was approved by the LPSC in December 2016. The settlement effectively provided for an agreed-upon disallowance of $67 million of plant, which had been previously written off by Entergy Louisiana, as discussed above. The refund to customers of approximately $71 million as a result of the settlement approved by the LPSC was made to customers in January 2017. Of the $71 million of refunds, $68 million was credited to customers through Entergy Louisiana’s formula rate plan, outside of sharing, and $3 million through its fuel adjustment clause. Entergy Louisiana had previously recorded a provision of $48 million for this refund. The previously-recorded provision included the cumulative revenues recorded through December 2016 related to the $67 million of disallowed plant. An additional regulatory charge of $23 million was recorded in fourth quarter 2016 to reflect the effects of the settlement. The settlement also provided that Entergy Louisiana could retain the value associated with potential service credits agreed to by the project contractor, to the extent they are realized in the future. Following a review by the parties, an unopposed joint report of proceedings was filed by the LPSC staff and Entergy Louisiana in May 2017 and the LPSC accepted the joint report of proceedings resolving the matter.

Ninemile 6

In July 2014, Entergy Gulf States Louisiana and Entergy Louisiana filed an unopposed stipulation with the LPSC, which was subsequently approved, that estimated a first year revenue requirement associated with Ninemile 6 and provided a mechanism to update the revenue requirement as the in-service date approached. In late-December 2014, roughly contemporaneous with the unit's placement in service, a final updated estimated revenue requirement of $26.8 million for Entergy Gulf States Louisiana and $51.1 million for Entergy Louisiana was filed. The December 2014 estimate formed the basis of rates implemented effective with the first billing cycle of January 2015. In July 2015, Entergy Louisiana submitted to the LPSC a compliance filing including an estimate at completion, inclusive of interconnection costs and transmission upgrades, of approximately $648 million, or $76 million less than originally estimated, along with other project details and supporting evidence, to enable the LPSC to review the prudence of Entergy Louisiana’s management of the project. Testimony filed by the LPSC staff generally supported the prudence of the management of the project and recovery of the costs incurred to complete the project. The LPSC staff had questioned the warranty coverage for one element of the project. In October 2016 all parties agreed to a stipulation providing that 100% of Ninemile 6 construction costs was prudently incurred and is eligible for recovery from customers, but reserving the LPSC’s rights to review the prudence of Entergy Louisiana’s actions regarding one element of the project. This stipulation was approved by the LPSC in January 2017.

Union Power Station and Deactivation or Retirement Decisions for Entergy Louisiana Plants

In January 2015, Entergy Gulf States Louisiana filed its application with the LPSC for approval of the acquisition and cost recovery of two power blocks of the Union Power Station for an expected base purchase price of approximately $237 million per power block, subject to adjustments. In September 2015, Entergy Gulf States Louisiana agreed to settlement terms with all parties for Entergy Gulf States Louisiana’s purchase of the two power blocks. In October 2015 the LPSC voted unanimously to approve the uncontested settlement which finds, among other things, that acquisition of Power Blocks 3 and 4 is in the public interest and, therefore, prudent. The business combination of Entergy Gulf States Louisiana and Entergy Louisiana received regulatory approval and closed in October 2015 making Entergy Louisiana the named purchaser of Power Blocks 3 and 4 of the Union Power Station. In March 2016, Entergy Louisiana acquired Power Blocks 3 and 4 of Union Power Station for an aggregate purchase price of approximately $474 million and implemented rates to collect the estimated first-year revenue requirement with the first billing cycle of March 2016.

As a term of the LPSC-approved settlement authorizing the purchase of Power Blocks 3 and 4 of the Union Power Station, Entergy Louisiana agreed to make a filing with the LPSC to review its decisions to deactivate Ninemile 3 and Willow Glen 2 and 4 and its decision to retire Little Gypsy 1.  In January 2016, Entergy Louisiana made its compliance filing with the LPSC. Entergy Louisiana, LPSC staff, and intervenors participated in a technical conference in March 2016 where Entergy Louisiana presented information on its deactivation/retirement decisions for these four units in addition to information on the current deactivation decisions for the ten-year planning horizon. Parties have requested further proceedings on the prudence of the decision to deactivate Willow Glen 2 and 4.  No party contests the prudence of the decision to deactivate Willow Glen 2 and 4 or suggests reactivation of these units; however, issues have been raised related to Entergy Louisiana’s decision to give up its transmission service rights in MISO for Willow Glen 2 and 4 rather than placing the units into suspended status for the three-year term permitted by MISO. An evidentiary hearing was held in August 2017 and post-hearing briefs were submitted in October 2017. A decision is expected in 2018.

Retail Rates - Gas 

In accordance with the settlement of Entergy Gulf States Louisiana’s gas rate stabilization plan for the test year ended September 30, 2012, in August 2014, Entergy Gulf States Louisiana submitted for consideration a proposal for implementation of an infrastructure rider to recover expenditures associated with strategic plant investment and relocation projects mandated by local governments. After review by the LPSC staff and inclusion of certain customer safeguards required by the LPSC staff, in December 2014, Entergy Gulf States Louisiana and the LPSC staff submitted a joint settlement for implementation of an accelerated gas pipe replacement program providing for the replacement of approximately 100 miles of pipe over the next ten years, as well as relocation of certain existing pipe resulting from local government-related infrastructure projects, and for a rider to recover the investment associated with these projects. The rider allows for recovery of approximately $65 million over ten years. The rider recovery will be adjusted on a quarterly basis to include actual investment incurred for the prior quarter and is subject to the following conditions, among others: a ten-year term; application of any earnings in excess of 10.45% as an offset to the revenue requirement of the infrastructure rider; adherence to a specified spending plan, within plus or minus 20% annually; annual filings comparing actual versus planned rider spending with actual spending and explanation of variances exceeding 10%; and an annual true-up. The joint settlement was approved by the LPSC in January 2015. Implementation of the infrastructure rider commenced with bills rendered on and after the first billing cycle of April 2015.

2014 Rate Stabilization Plan Filing

In January 2015, Entergy Gulf States Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2014.  The filing showed an earned return on common equity of 7.20%, which resulted in a $706 thousand rate increase.  In April 2015 the LPSC issued findings recommending two adjustments to Entergy Gulf States Louisiana’s as-filed results, and an additional recommendation that did not affect the results. The LPSC staff’s recommended adjustments increase the earned return on equity for the test year to 7.24%. Entergy Gulf States Louisiana accepted the LPSC staff’s recommendations and a revenue increase of $688 thousand was implemented with the first billing cycle of May 2015.

2015 Rate Stabilization Plan Filing

In January 2016, Entergy Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2015. The filing showed an earned return on common equity of 10.22%, which is within the authorized bandwidth, therefore requiring no change in rates. In March 2016 the LPSC staff issued its report stating that the 2015 gas rate stabilization plan filing was in compliance with the exception of several issues that required additional information, explanation, or clarification for which the LPSC staff had reserved the right to further review. In July 2016 the parties to the proceeding filed an unopposed joint report and motion for entry of order accepting the report that indicated no outstanding issues remained in the filing.

In February 2016, Entergy Louisiana filed a motion requesting to extend the term of the gas rate stabilization plan in substantially similar form for an additional three-year term and included a request for sharing of non-jurisdictional compressed natural gas revenues. Following discovery and the filing of testimony by the LPSC staff, Entergy Louisiana and the LPSC submitted a joint motion for hearing an uncontested stipulated settlement resolving the proceeding. A hearing on the stipulation was held in November 2016. The ALJ issued a report of proceedings that was presented with the parties’ stipulation to the LPSC for consideration. The stipulation approving Entergy Louisiana’s requested extension of the rate stabilization plan was approved by the LPSC in December 2016.

2016 Rate Stabilization Plan Filing

In January 2017, Entergy Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2016. The filing of the evaluation report for test year 2016 reflected an earned return on common equity of 6.37%. As part of the original filing, pursuant to the extraordinary cost provision of the rate stabilization plan, Entergy Louisiana sought to recover approximately $1.5 million in deferred operation and maintenance expenses incurred to restore service and repair damage resulting from flooding and widespread rainfall in southeast Louisiana that occurred in August 2016. Entergy Louisiana requested to recover the prudently incurred August 2016 storm restoration costs over ten years, outside of the rate stabilization plan sharing provisions. As a result, Entergy Louisiana’s filing sought an annual increase in revenue of $1.4 million. Following review of the filing, except for the proposed extraordinary cost recovery, the LPSC staff confirmed Entergy Louisiana’s filing was consistent with the principles and requirements of the rate stabilization plan. The extraordinary cost recovery request associated with the 2016 flood-related deferred operation and maintenance expenses incurred for gas operations was removed from the rate stabilization plan pending LPSC consideration in a separate docket. In April 2017 the LPSC approved a joint report of proceedings and Entergy Louisiana submitted a revised evaluation report reflecting a $1.2 million annual increase in revenue with rates implemented with the first billing cycle of May 2017.

In connection with the joint report of proceedings accepted by the LPSC, in May 2017, Entergy Louisiana filed an application to initiate a separate proceeding to recover through the extraordinary cost provision of the gas rate stabilization plan the deferred operation and maintenance expenses of $1.4 million incurred to restore service and repair damage resulting from flooding and widespread rainfall in southeast Louisiana that occurred in August 2016. The LPSC staff submitted its direct testimony in the proceeding recommending recovery of $0.9 million. Entergy Louisiana filed rebuttal testimony responding to the LPSC staff’s recommendation. The procedural schedule was suspended to allow the parties to engage in settlement negotiations, and in February 2018 the LPSC staff and Entergy Louisiana filed an unopposed settlement. If approved by the LPSC, the settlement would provide for Entergy Louisiana to recover, over ten years, the approximately $1.4 million in deferred operation and maintenance expense and related carrying charges. The settlement further provides for recovery to commence in May 2018.

2017 Rate Stabilization Plan Filing

In January 2018, Entergy Louisiana filed with the LPSC its gas rate stabilization plan for test year ended September 30, 2017.  The filing of the evaluation report for the test year 2017 reflected an earned return on common equity of 9.06%.  This earned return is below the earnings sharing band of the rate stabilization plan and results in a rate increase of $0.1 million.  Due to the enactment in late-December 2017 of the Tax Cuts and Jobs Act, Entergy Louisiana did not have adequate time to reflect the effects of this tax legislation in the rate stabilization plan.  As a result, Entergy Louisiana will file a supplement to the January 2018 evaluation report to reflect, among other things, a 21% federal corporate income tax rate.  Any rate change resulting from the revised rate stabilization plan will become effective in rates in May 2018.

Filings with the MPSC (Entergy Mississippi)

Formula Rate Plan Filings

In March 2016, Entergy Mississippi submitted its formula rate plan 2016 test year filing showing Entergy Mississippi’s projected earned return for the 2016 calendar year to be below the formula rate plan bandwidth. The filing showed a $32.6 million rate increase was necessary to reset Entergy Mississippi’s earned return on common equity to the specified point of adjustment of 9.96%, within the formula rate plan bandwidth. In June 2016 the MPSC approved Entergy Mississippi’s joint stipulation with the Mississippi Public Utilities Staff. The joint stipulation provided for a total revenue increase of $23.7 million. The revenue increase includes a $19.4 million increase through the formula rate plan, resulting in a return on common equity point of adjustment of 10.07%. The revenue increase also includes $4.3 million in incremental ad valorem tax expenses to be collected through an updated ad valorem tax adjustment rider. The revenue increase and ad valorem tax adjustment rider were effective with the July 2016 bills.

In March 2017, Entergy Mississippi submitted its formula rate plan 2017 test year filing and 2016 look-back filing showing Entergy Mississippi’s earned return for the historical 2016 calendar year and projected earned return for the 2017 calendar year to be within the formula rate plan bandwidth, resulting in no change in rates. In June 2017, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a stipulation that confirmed that Entergy Mississippi’s earned returns for both the 2016 look-back filing and 2017 test year were within the respective formula rate plan bandwidths. In June 2017 the MPSC approved the stipulation, which resulted in no change in rates.

Filings with the City Council (Entergy New Orleans)

Retail Rates

See “Algiers Asset Transfer” below for discussion of the Algiers asset transfer. As a provision of the settlement agreement approved by the City Council in May 2015 providing for the Algiers asset transfer, it was agreed that, with limited exceptions, no action may be taken with respect to Entergy New Orleans’s base rates until rates are implemented from a base rate case that must be filed for its electric and gas operations in 2018. This provision eliminated the formula rate plan applicable to Algiers operations. The limited exceptions included continued implementation of the then-remaining two years of the four-year phased-in rate increase for the Algiers area and certain exceptional cost increases or decreases in the base revenue requirement. An additional provision of the settlement agreement allowed for continued recovery of the revenue requirement associated with the capacity and energy from Ninemile 6 received by Entergy New Orleans under a power purchase agreement with Entergy Louisiana (Algiers PPA). The settlement authorized Entergy New Orleans to recover the remaining revenue requirement related to the Algiers PPA through base rates charged to Algiers customers. The settlement also provided for continued implementation of the Algiers MISO recovery rider.

In addition to the Algiers PPA, Entergy New Orleans has a separate power purchase agreement with Entergy Louisiana for 20% of the capacity and energy from Ninemile 6 (Ninemile PPA), which commenced operation in December 2014. Initially, recovery of the non-fuel costs associated with the Ninemile PPA was authorized through a special Ninemile 6 rider billed only to Entergy New Orleans customers outside of Algiers.

In August 2015, Entergy New Orleans filed an application with the City Council seeking authorization to proceed with the purchase of Union Power Block 1, with an expected base purchase price of approximately $237 million, subject to adjustments, and seeking approval of the recovery of the associated costs. In November 2015 the City Council issued written resolutions and an order approving an agreement in principle between Entergy New Orleans and City Council advisors providing that the purchase of Union Power Block 1 and related assets by Entergy New Orleans is prudent and in the public interest. The City Council authorized expansion of the terms of the purchased power and capacity acquisition cost recovery rider to recover the non-fuel purchased power expense from Ninemile 6, the revenue requirement associated with the purchase of Power Block 1 of the Union Power Station, and a credit to customers of $400 thousand monthly beginning June 2016 in recognition of the decrease in other operation and maintenance expenses that would result with the deactivation of Michoud Units 2 and 3. In March 2016, Entergy New Orleans purchased Power Block 1 of the Union Power Station for approximately $237 million and initiated recovery of these costs with March 2016 bills. In July 2016, Entergy New Orleans and the City Council Utility Committee agreed to a temporary increase in the Michoud credit to customers to a total of $1.4 million monthly for August 2016 through December 2016.

A 2008 rate case settlement included $3.1 million per year in electric rates to fund the Energy Smart energy efficiency programs.  The rate settlement provided an incentive for Entergy New Orleans to meet or exceed energy savings targets set by the City Council and provided a mechanism for Entergy New Orleans to recover lost contribution to fixed costs associated with the energy savings generated from the energy efficiency programs. In January 2015 the City Council approved funding for the Energy Smart program from April 2015 through March 2017 using the remainder of the approximately $12.8 million of 2014 rough production cost equalization funds, with any remaining costs being recovered through the fuel adjustment clause. This funding methodology was modified in November 2015 when the City Council directed Entergy New Orleans to use a combination of guaranteed customer savings related to a prior agreement with the City Council and rough production cost equalization funds to cover program costs prior to recovering any costs through the fuel adjustment clause. In April 2017 the City Council approved an implementation plan for the Energy Smart program from April 2017 through December 2019. The City Council directed that the $11.8 million balance reported for Energy Smart funds be used to continue funding the program for Entergy New Orleans’s legacy customers and that the Energy Smart Algiers program continue to be funded through the Algiers fuel adjustment clause, until additional customer funding is required for the legacy customers. In September 2017, Entergy New Orleans filed a supplemental plan and proposed several options for an interim cost recovery mechanism necessary to recover program costs during the period between when existing funds directed to Energy Smart programs are depleted (estimated to be June 2018) and when new rates from the anticipated 2018 combined rate case, which will include a cost recovery mechanism for Energy Smart funding, take effect (estimated to be August 2019). Entergy New Orleans requested that the City Council approve a cost recovery mechanism prior to June 2018. In December 2017 the City Council approved an energy efficiency cost recovery rider as an interim funding mechanism for Energy Smart, subject to verification that no additional funding sources exist.

Internal Restructuring

In July 2016, Entergy New Orleans filed an application with the City Council seeking authorization to undertake a restructuring that would result in the transfer of substantially all of the assets and operations of Entergy New Orleans, Inc. to a new entity, which would ultimately be owned by an existing Entergy subsidiary holding company. The restructuring was subject to regulatory review and approval by the City Council and the FERC. In May 2017 the City Council adopted a resolution approving the proposed internal restructuring pursuant to an agreement in principle with the City Council advisors and certain intervenors. Pursuant to the agreement in principle, Entergy New Orleans would credit retail customers $10 million in 2017, $1.4 million in the first quarter of the year after the transaction closes, and $117,500 each month in the second year after the transaction closes until such time as new base rates go into effect as a result of the anticipated 2018 base rate case. Entergy New Orleans began crediting retail customers in June 2017. In June 2017 the FERC approved the transaction and, pursuant to the agreement in principle, Entergy New Orleans will provide additional credits to retail customers of $5 million in each of the years 2018, 2019, and 2020.

In November 2017, pursuant to the agreement in principle, Entergy New Orleans undertook a multi-step restructuring, including the following:

Entergy New Orleans, Inc. redeemed its outstanding preferred stock at a price of approximately $21 million, which included a call premium of approximately $819,000, plus any accumulated and unpaid dividends.
Entergy New Orleans, Inc. converted from a Louisiana corporation to a Texas corporation.
Under the Texas Business Organizations Code (TXBOC), Entergy New Orleans, Inc. allocated substantially all of its assets to a new subsidiary, Entergy New Orleans Power, LLC, a Texas limited liability company (Entergy New Orleans Power), and Entergy New Orleans Power assumed substantially all of the liabilities of Entergy New Orleans, Inc., in a transaction regarded as a merger under the TXBOC. Entergy New Orleans, Inc. remained in existence and held the membership interests in Entergy New Orleans Power.
Entergy New Orleans, Inc. contributed the membership interests in Entergy New Orleans Power to an affiliate (Entergy Utility Holding Company, LLC, a Texas limited liability company and subsidiary of Entergy Corporation). As a result of the contribution, Entergy New Orleans Power is a wholly-owned subsidiary of Entergy Utility Holding Company, LLC.

In December 2017, Entergy New Orleans, Inc. changed its name to Entergy Utility Group, Inc., and Entergy New Orleans Power then changed its name to Entergy New Orleans, LLC. Entergy New Orleans, LLC holds substantially all of the assets, and has assumed substantially all of the liabilities, of Entergy New Orleans, Inc. The restructuring was accounted for as a transaction between entities under common control.

Filings with the PUCT and Texas Cities (Entergy Texas)

Retail Rates

2011 Rate Case

In November 2011, Entergy Texas filed a rate case requesting a $112 million base rate increase reflecting a 10.6% return on common equity based on an adjusted June 2011 test year.  The rate case also proposed a purchased power recovery rider.  On January 12, 2012, the PUCT voted not to address the purchased power recovery rider in the rate case, but the PUCT voted to set a baseline in the rate case proceeding that would be applicable if a purchased power capacity rider is approved in a separate proceeding.  In April 2012 the PUCT Staff filed direct testimony recommending a base rate increase of $66 million and a 9.6% return on common equity.  The PUCT Staff, however, subsequently filed a statement of position in the proceeding indicating that it was still evaluating the position it would ultimately take in the case regarding Entergy Texas’s recovery of purchased power capacity costs and Entergy Texas’s proposal to defer its MISO transition expenses.  In April 2012, Entergy Texas filed rebuttal testimony indicating a revised request for a $105 million base rate increase.  A hearing was held in late-April through early-May 2012.

In September 2012 the PUCT issued an order approving a $28 million rate increase, effective July 2012.  The order included a finding that “a return on common equity (ROE) of 9.80 percent will allow [Entergy Texas] a reasonable opportunity to earn a reasonable return on invested capital.”  The order also provided for increases in depreciation rates and the annual storm reserve accrual.  The order also reduced Entergy Texas’s proposed purchased power capacity costs, stating that they are not known and measurable; reduced Entergy Texas’s regulatory assets associated with Hurricane Rita; excluded from rate recovery capitalized financially-based incentive compensation; included $1.6 million of MISO transition expense in base rates; and reduced Entergy’s Texas’s fuel reconciliation recovery by $4 million because the PUCT disagreed with the line-loss factor used in the calculation.  After considering the progress of the proceeding in light of the PUCT order, Entergy Texas recorded in the third quarter 2012 an approximate $24 million charge to recognize that assets associated with Hurricane Rita, financially-based incentive compensation, and fuel recovery are no longer probable of recovery.  Entergy Texas believed that it was entitled to recover these prudently incurred costs, however, and it filed a motion for rehearing regarding these and several other issues in the PUCT’s order on October 4, 2012.  Several other parties also filed motions for rehearing of the PUCT’s order.  The PUCT subsequently denied rehearing of substantive issues.  Several parties, including Entergy Texas, appealed various aspects of the PUCT’s order to the Travis County District Court. A hearing was held in July 2014. In October 2014 the Travis County District Court issued an order upholding the PUCT’s decision except as to the line-loss factor issue referenced above, which was found in favor of Entergy Texas. In November 2014, Entergy Texas and other parties, including the PUCT, appealed the Travis County District Court decision to the Third Court of Appeals. Oral argument before the court panel was held in September 2015. In April 2016 the Third Court of Appeals issued its opinion affirming the District Court’s decision on all points. Entergy Texas petitioned the Texas Supreme Court to hear its appeal of the Third Court’s ruling. In September 2017 the Texas Supreme Court denied the petitions for review. Entergy Texas filed a motion for rehearing of the Texas Supreme Court’s denial of the petition for review. In January 2018 the Texas Supreme Court denied Entergy Texas’s motion for rehearing.

Distribution cost recovery factor (DCRF) rider

In September 2015, Entergy Texas filed to amend its DCRF rider. Entergy Texas requested an increase in recovery under the rider of $6.5 million, for a total collection of $10.1 million annually from retail customers. In October 2015 intervenors and PUCT staff filed testimony opposing, in part, Entergy Texas’s request. In November 2015, Entergy Texas and the parties filed an unopposed settlement agreement and supporting documents. The settlement established an annual revenue requirement of $8.65 million for the amended DCRF rider, with the resulting rates effective for usage on and after January 1, 2016. The PUCT approved the settlement agreement in February 2016.

In June 2017, Entergy Texas filed an application to amend its DCRF rider by increasing the total collection from $8.65 million to approximately $19 million. In July 2017, Entergy Texas, the PUCT, and the two other parties in the proceeding entered into an unopposed stipulation and settlement agreement resulting in an amended DCRF annual revenue requirement of $18.3 million, with the resulting rates effective for usage no later than October 1, 2017. In September 2017 the PUCT issued its final order approving the unopposed stipulation and settlement agreement. The amended DCRF rider rates became effective for usage on and after September 1, 2017.
    
Transmission cost recovery factor (TCRF) rider

In September 2015, Entergy Texas filed for a TCRF rider requesting a $13 million increase, incremental to base rates. Testimony was filed in November 2015, with the PUCT staff and other parties proposing various disallowances involving, among other things, MISO charges, vegetation management costs, and bad debt expenses that would reduce the requested increase by approximately $2 million. In addition to those recommended disallowances, a number of parties recommended that Entergy Texas’s request be reduced by an additional $3.4 million to account for load growth since base rates were last set. A hearing on the merits was held in December 2015. In February 2016 a State Office of Administrative Hearings ALJ issued a proposal for decision recommending that the PUCT disallow approximately $2 million from Entergy Texas’s $13 million request, but recommending that the PUCT not accept the load growth offset. In June 2016 the PUCT indicated that it would take up in a future rulemaking project the issue of whether a load growth adjustment should apply to a TCRF. In July 2016 the PUCT issued an order generally accepting the proposal for decision but declining to adjust the TCRF baseline in two instances as recommended by the ALJ, which resulted in a total annual allowance of approximately $10.5 million. The PUCT also ordered its staff and Entergy Texas to track all spare autotransformer transfers going forward so that it could address the appropriate accounting treatment and prudence of such transfers in Entergy Texas’s next base rate case. Entergy Texas implemented the TCRF rider beginning with September 2016 bills.

In September 2016, Entergy Texas filed with the PUCT a request to amend its TCRF rider. The proposed amended TCRF rider is designed to collect approximately $29.5 million annually from Entergy Texas’s retail customers. This amount includes the approximately $10.5 million annually that Entergy Texas is currently authorized to collect through the TCRF rider, as discussed above. In December 2016, concurrent with the 2016 fuel reconciliation stipulation and settlement agreement discussed above, Entergy Texas and the PUCT reached a settlement agreeing to the amended TCRF annual revenue requirement of $29.5 million. As discussed above, the terms of the two settlements are interdependent. The PUCT approved the settlement and issued a final order in March 2017. Entergy Texas implemented the amended TCRF rider beginning with bills covering usage on and after March 20, 2017.

Advanced Metering Infrastructure (AMI) Filings

Entergy Arkansas

In September 2016, Entergy Arkansas filed an application seeking a finding from the APSC that Entergy Arkansas’s deployment of AMI is in the public interest. Entergy Arkansas proposed to replace existing meters with advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems. AMI is intended to serve as the foundation of Entergy Arkansas’s modernized power grid. The filing included an estimate of implementation costs for AMI of $208 million. The filing identified a number of quantified and unquantified benefits, and Entergy Arkansas provided a cost benefit analysis showing that its AMI deployment is expected to produce a nominal net benefit to customers of $406 million. Entergy Arkansas also sought to continue to include in rate base the remaining book value of existing meters, which was approximately $57 million at December 31, 2015, that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates. Entergy Arkansas proposed a 15-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019. Deployment of the communications network is expected to begin in 2018. Entergy Arkansas proposed to include the AMI deployment costs and the quantified benefits in future formula rate plan filings, and the 2018 costs were approved in the 2017 formula rate plan filing. In June 2017 the APSC staff and Arkansas Attorney General filed direct testimony. The APSC staff generally supported Entergy Arkansas’s AMI deployment conditioned on various recommendations. The Arkansas Attorney General’s consultant primarily recommended denial of Entergy Arkansas’s application but alternatively suggested recommendations in the event the APSC approves Entergy Arkansas’s proposal. Entergy Arkansas filed rebuttal testimony in June 2017, substantially accepting the APSC staff’s recommendations. In August 2017, Entergy Arkansas and the parties to the proceeding filed a joint motion to approve a unanimous settlement agreement. In October 2017 the APSC issued an order finding that Entergy Arkansas’s AMI deployment is in the public interest and approving the settlement agreement subject to a minor modification. Entergy Arkansas expects to recover the undepreciated balance of its existing meters through a regulatory asset to be amortized over 15 years. Entergy Arkansas has begun discussions with the other parties to implement the items in the settlement agreement including pre-pay and time of use programs.

Entergy Louisiana

In November 2016, Entergy Louisiana filed an application seeking a finding from the LPSC that Entergy Louisiana’s deployment of advanced electric and gas metering infrastructure is in the public interest. Entergy Louisiana proposed to deploy advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems. AMI is intended to serve as the foundation of Entergy Louisiana’s modernized power grid. The filing included an estimate of implementation costs for AMI of $330 million. The filing identified a number of quantified and unquantified benefits, and Entergy Louisiana provided a cost/benefit analysis showing that its combined electric and gas AMI deployment is expected to produce a nominal net benefit to customers of $607 million. Entergy Louisiana also sought to continue to include in rate base the remaining book value, approximately $92 million at December 31, 2015, of the existing electric meters and also to depreciate those assets using current depreciation rates. Entergy Louisiana proposed a 15-year useful life for the new advanced meters, the three-year deployment of which is expected to begin in 2019. The communications network deployment is expected to begin by late-2018, after the necessary information technology infrastructure is in place. Entergy Louisiana proposed to recover the cost of AMI through the implementation of a customer charge, net of certain benefits, phased in over the period 2019 through 2022. The parties reached an uncontested stipulation permitting implementation of Entergy Louisiana’s proposed AMI system, with modifications to the proposed customer charge. In July 2017 the LPSC approved the stipulation. Entergy Louisiana expects to recover the undepreciated balance of its existing meters through a regulatory asset to be amortized at current depreciation rates.

Entergy Mississippi

In November 2016, Entergy Mississippi filed an application seeking an order from the MPSC granting a certificate of public convenience and necessity and finding that Entergy Mississippi’s deployment of AMI is in the public interest. Entergy Mississippi proposed to replace existing meters with advanced meters that enable two-way data communication; to design and build a secure and reliable network to support such communications; and to implement support systems. AMI is intended to serve as the foundation of Entergy Mississippi’s modernized power grid. The filing included an estimate of implementation costs for AMI of $132 million. The filing identified a number of quantified and unquantified benefits, and Entergy Mississippi provided a cost benefit analysis showing that its AMI deployment is expected to produce a nominal benefit to customers of $496 million over a 15-year period, which when netted against the costs of AMI results in $183 million of net customer benefits. Entergy Mississippi also sought to continue to include in rate base the remaining book value, approximately $56 million at December 31, 2015, of existing meters that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates. Entergy Mississippi proposed a 15-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019, subject to approval by the MPSC, with deployment of the communications network expected to begin in 2018. Entergy Mississippi proposed to include the AMI deployment costs and the quantified benefits in existing rate mechanisms, primarily through future formula rate plan filings and/or future energy cost recovery rider schedule re-determinations, as applicable. In May 2017 the Mississippi Public Utilities Staff and Entergy Mississippi entered into and filed a joint stipulation supporting Entergy Mississippi’s filing, and the MPSC issued an order approving the filing without material changes, finding that Entergy Mississippi’s deployment of AMI is in the public interest and granting a certificate of public convenience and necessity. The MPSC order also confirmed that Entergy Mississippi shall continue to include in rate base the remaining book value of existing meters that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates.

Entergy New Orleans

In October 2016, Entergy New Orleans filed an application seeking a finding from the City Council that Entergy New Orleans’s deployment of advanced electric and gas metering infrastructure is in the public interest.  Entergy New Orleans proposed to deploy advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems.  AMI is intended to serve as the foundation of Entergy New Orleans’s modernized power grid.  The filing included an estimate of implementation costs for AMI of $75 million. The filing identified a number of quantified and unquantified benefits, and Entergy New Orleans provided a cost/benefit analysis showing that its combined electric and gas AMI deployment is expected to produce a nominal net benefit to customers of $101 million.  Entergy New Orleans also sought to continue to include in rate base the remaining book value, approximately $21 million at December 31, 2015, of the existing electric meters and also to depreciate those assets using current depreciation rates.  Entergy New Orleans proposed a 15-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019.  Deployment of the information technology infrastructure began in 2017 and deployment of the communications network is expected to begin in 2018.  Entergy New Orleans proposed to recover the cost of AMI through the implementation of a customer charge, net of certain benefits, phased in over the period 2019 through 2022.  The City Council’s advisors filed testimony in May 2017 recommending the adoption of AMI subject to certain modifications, including the denial of Entergy New Orleans’s proposed customer charge as a cost recovery mechanism. In January 2018 a settlement was reached between the City Council’s advisors and Entergy New Orleans. In February 2018 the City Council approved the settlement, which deferred cost recovery to the 2018 Entergy New Orleans rate case, but also stated that an adjustment for 2018-2019 AMI costs can be filed in the rate case and that, for all subsequent AMI costs, the mechanism to be approved in the 2018 rate case will allow for the timely recovery of such costs.

Entergy Texas

In April 2017 the Texas legislature enacted legislation that extends statutory support for AMI deployment to Entergy Texas and directs that if Entergy Texas elects to deploy AMI, it shall do so as rapidly as practicable. In July 2017, Entergy Texas filed an application seeking an order from the PUCT approving Entergy Texas’s deployment of AMI. Entergy Texas proposed to replace existing meters with advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems. AMI is intended to serve as the foundation of Entergy Texas’s modernized power grid. The filing included an estimate of implementation costs for AMI of $132 million. The filing identified a number of quantified and unquantified benefits, with Entergy Texas showing that its AMI deployment is expected to produce nominal net operational cost savings to customers of $33 million. Entergy Texas also sought to continue to include in rate base the remaining book value, approximately $41 million at December 31, 2016, of existing meters that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates. Entergy Texas proposed a seven-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019. Entergy Texas also proposed a surcharge tariff to recover the reasonable and necessary costs it has and will incur under the deployment plan for the full deployment of advanced meters. Further, Entergy Texas sought approval of fees that would be charged to customers who choose to opt out of receiving service through an advanced meter and instead receive electric service with a non-standard meter. In October 2017, Entergy Texas and other parties entered into and filed an unopposed stipulation and settlement agreement, permitting deployment of AMI with limited modifications. The PUCT approved the stipulation and settlement agreement in December 2017. Consistent with the approval, deployment of the communications network is expected to begin in 2018. Entergy Texas expects to recover the remaining net book value of its existing meters through a regulatory asset to be amortized at current depreciation rates.

Entergy Louisiana and Entergy Gulf States Louisiana Business Combination

Entergy Louisiana and Entergy Gulf States Louisiana filed an application with the LPSC in September 2014 seeking authorization to undertake transactions that would result in the combination of Entergy Louisiana and Entergy Gulf States Louisiana into a single public utility. An uncontested stipulated settlement (stipulated settlement) was filed with the LPSC in July 2015. Through the stipulated settlement, the parties agreed to terms upon which to recommend that the LPSC find that the business combination was in the public interest. The stipulated settlement, which was either joined, or unopposed, by all parties to the LPSC proceeding, represented a compromise of stakeholder positions and was the result of an extensive period of analysis, discovery, and negotiation. The stipulated settlement provided $107 million in guaranteed customer benefits during the first nine years following the transaction’s close. Additionally, the combined company would honor the 2013 Entergy Louisiana and Entergy Gulf States Louisiana rate case settlements, including the commitments that (1) there would be no rate increase for legacy Entergy Gulf States Louisiana customers for the 2014 test year, and (2) through the 2016 test year formula rate plan, Entergy Louisiana (as a combined entity) would not raise rates by more than $30 million, net of the $10 million rate increase included in the Entergy Louisiana legacy formula rate plan. The stipulated settlement also provided that Entergy Gulf States Louisiana and Entergy Louisiana would be permitted to defer certain external costs that were incurred to achieve the business combination’s customer benefits. In 2015 deferrals of $16 million for these external costs were recorded, and they are being amortized over a 10-year period. The LPSC approved the business combination in August 2015.

On October 1, 2015, the businesses formerly conducted by Entergy Louisiana and Entergy Gulf States Louisiana were combined into a single public utility. With the completion of the business combination, Entergy Louisiana holds substantially all of the assets, and has assumed the liabilities, of Entergy Louisiana and Entergy Gulf States Louisiana. The combination was accounted for as a transaction between entities under common control. See Note 3 to the financial statements for further discussion of the customer credits resulting from the business combination.

Algiers Asset Transfer (Entergy Louisiana and Entergy New Orleans)

In October 2014, Entergy Louisiana and Entergy New Orleans filed an application with the City Council seeking authorization to undertake a transaction that would result in the transfer from Entergy Louisiana to Entergy New Orleans of certain assets that supported the provision of service to Entergy Louisiana’s customers in Algiers. In April 2015 the FERC issued an order approving the Algiers assets transfer. In May 2015 the parties filed a settlement agreement authorizing the Algiers assets transfer and the settlement agreement was approved by a City Council resolution in May 2015. On September 1, 2015, Entergy Louisiana transferred its Algiers assets to Entergy New Orleans for a purchase price of approximately $85 million. Entergy New Orleans paid Entergy Louisiana $59.6 million, including final true-ups, from available cash and issued a note payable to Entergy Louisiana in the amount of $25.5 million.

System Agreement Cost Equalization Proceedings

Prior to its final termination in 2016, the Utility operating companies historically engaged in the coordinated planning, construction, and operation of generating and bulk transmission facilities under the terms of the System Agreement.  Entergy Arkansas terminated its participation in the System Agreement in December 2013. Entergy Mississippi terminated its participation in the System Agreement in November 2015. The System Agreement terminated with respect to its remaining participants in August 2016.

Although the System Agreement has terminated, certain of the Utility operating companies’ retail regulators continue to pursue litigation involving the System Agreement at the FERC and in federal courts.  The proceedings include challenges to the allocation of costs as defined by the System Agreement and other matters.

In June 2005 the FERC issued a decision in System Agreement litigation that had been commenced by the LPSC, and essentially affirmed its decision in a December 2005 order on rehearing.  The decision included, among other things:

The FERC’s conclusion that the System Agreement no longer roughly equalizes total production costs among the Utility operating companies.
In order to reach rough production cost equalization, the FERC imposed a bandwidth remedy by which each company’s total annual production costs will have to be within +/- 11% of Entergy System average total annual production costs.
In calculating the production costs for this purpose under the FERC’s order, output from the Vidalia hydroelectric power plant will not reflect the actual Vidalia price for the year but is priced at that year’s average price paid by Entergy Louisiana for the exchange of electric energy under Service Schedule MSS-3 of the System Agreement, thereby reducing the amount of Vidalia costs reflected in the comparison of the Utility operating companies’ total production costs.
The remedy ordered by the FERC in 2005 required no refunds and became effective based on calendar year 2006 production costs and the first reallocation payments were made in 2007.
The FERC’s decision reallocated total production costs of the Utility operating companies whose relative total production costs expressed as a percentage of Entergy System average production costs are outside an upper or lower bandwidth.  This was accomplished by payments from Utility operating companies whose production costs were more than 11% below Entergy System average production costs to Utility operating companies whose production costs were more than the Entergy System average production cost, with payments going first to those Utility operating companies whose total production costs were farthest above the Entergy System average.

The LPSC, APSC, MPSC, and the Arkansas Electric Energy Consumers appealed the FERC’s December 2005 decision to the United States Court of Appeals for the D.C. Circuit.  Entergy and the City of New Orleans intervened in the various appeals.  The D.C. Circuit issued its decision in April 2008.  The D.C. Circuit concluded that the FERC’s orders had failed to adequately explain both its conclusion that it was prohibited from ordering refunds for the 20-month period from September 13, 2001 - May 2, 2003 and its determination to implement the bandwidth remedy commencing on January 1, 2006, rather than June 1, 2005.  The D.C. Circuit remanded the case to the FERC for further proceedings on those two issues.

In October 2011 the FERC issued an order addressing the D.C. Circuit remand on the two issues.  On the first issue, the FERC concluded that it did have the authority to order refunds, but decided that it would exercise its equitable discretion and not require refunds for the 20-month period from September 13, 2001 - May 2, 2003.  Because the ruling on refunds relied on findings in the interruptible load proceeding, which is discussed in a separate section below, the FERC concluded that this refund ruling will be held in abeyance pending the outcome of the rehearing requests in the interruptible load proceeding.  On the second issue, the FERC reversed its prior decision and ordered that the prospective bandwidth remedy begin on June 1, 2005 (the date of its initial order in the proceeding) rather than January 1, 2006, as it had previously ordered.  Pursuant to the October 2011 order, Entergy was required to calculate bandwidth payments for the period June - December 2005 utilizing the bandwidth formula tariff prescribed by the FERC that was filed in a December 2006 compliance filing and accepted by the FERC in an April 2007 order.  

In March 2015, in light of a December 2014 decision by the D.C. Circuit in the interruptible load proceeding, Entergy filed with the FERC a motion to establish a briefing schedule on refund issues and an initial brief addressing refund issues. The initial brief argued that the FERC, in response to the D.C. Circuit decision, should clarify its policy on refunds and find that refunds are not required in this proceeding. In October 2015 the FERC issued three orders related to the commencement of the remedy on June 1, 2005 and the inclusion of interest for the period June 1, 2005 through December 31, 2005. Specifically, the FERC rejected Entergy’s request for rehearing of its decision to include interest for the seven-month period. The FERC also rejected Entergy’s request for rehearing of the order rejecting the compliance filing with regard to the issue of interest. Finally, the FERC set for hearing and settlement procedures the 2014 compliance filing that included the bandwidth calculation for the seven months June 1, 2005 through December 31, 2005. In setting the compliance filing for hearing, the FERC rejected the APSC’s protest that Entergy Arkansas should not be subject to the filing because Entergy Arkansas would be making the payments during a period following its exit from the System Agreement. In January 2018 the D.C.Circuit affirmed the FERC decision that Entergy Arkansas was subject to the filing.

In December 2011, Entergy filed with the FERC its compliance filing that provides the payments and receipts among the Utility operating companies pursuant to the FERC’s October 2011 order.  The APSC, the LPSC, the PUCT, and other parties intervened in the December 2011 compliance filing proceeding, and the APSC and the LPSC also filed protests. The filing shows the following payments/receipts among the Utility operating companies:

 
Payments (Receipts)
 
(In Millions)
Entergy Arkansas
$156
Entergy Louisiana
($75)
Entergy Mississippi
($33)
Entergy New Orleans
($5)
Entergy Texas
($43)


Entergy Arkansas made its payment in January 2012.  In February 2012, Entergy Arkansas filed for an interim adjustment to its production cost allocation rider requesting that the $156 million be collected from customers over the 22-month period from March 2012 through December 2013.  In March 2012 the APSC issued an order stating that the payment can be recovered from retail customers through the production cost allocation rider, subject to refund.  The LPSC and the APSC requested rehearing of the FERC’s October 2011 order.  

In February 2014 the FERC issued a rehearing order addressing its October 2011 order. The FERC denied the LPSC’s request for rehearing on the issues of whether the bandwidth remedy should be made effective earlier than June 1, 2005, and whether refunds should be ordered for the 20-month refund effective period. The FERC granted the LPSC’s rehearing request on the issue of interest on the bandwidth payments/receipts for the June - December 2005 period, requiring that interest be accrued from June 1, 2006 until the date those bandwidth payments/receipts are made. Also in February 2014 the FERC issued an order rejecting the December 2011 compliance filing that calculated the bandwidth payments/receipts for the June - December 2005 period. The FERC order required a new compliance filing that calculates the bandwidth payments/receipts for the June - December 2005 period based on monthly data for the seven individual months including interest pursuant to the February 2014 rehearing order. Entergy sought rehearing of the February 2014 order with respect to the FERC’s determinations regarding interest. In April 2014 the LPSC filed a petition for review of the FERC’s October 2011 and February 2014 orders with the U.S. Court of Appeals for the D.C. Circuit. In August 2017 the D.C. Circuit issued a decision addressing the LPSC’s appeal of the FERC’s October 2011 and February 2014 orders. On the issue of the FERC’s implementation of the prospective remedy as of June 2005 and whether the bandwidth remedy should be extended for an additional 17 months in years 2004-2005, the D.C. Circuit affirmed the FERC’s implementation of the remedy and denied the LPSC’s appeal. On the issue of whether the operating companies should be required to issue refunds for the 20-month period from September 2001 to May 2003, the D.C. Circuit granted the FERC’s request for agency reconsideration and remanded that issue back to the FERC for further proceedings as requested by all parties to the appeal.

In April and May 2014, Entergy filed with the FERC an updated compliance filing that provides the payments and receipts among the Utility operating companies pursuant to the FERC’s February 2014 orders.  The filing shows the following net payments and receipts, including interest, among the Utility operating companies:
 
Payments (Receipts)
 
(In Millions)
Entergy Arkansas
$68
Entergy Louisiana
($10)
Entergy Mississippi
($11)
Entergy New Orleans
$2
Entergy Texas
($49)

These payments were made in May 2014. The LPSC, City Council, and APSC filed protests.

The hearing on the bandwidth calculation for the seven months June 1, 2005 through December 31, 2005 occurred in July 2016. The presiding judge issued an initial decision in November 2016. In the initial decision, the presiding judge agreed with the Utility operating companies’ position that: (1) interest on the bandwidth payments for the 2005 test period should be accrued from June 1, 2006 until the date that the bandwidth payments for that calculation are paid, which is consistent with how the Utility operating companies performed the calculation; and (2) a portion of Entergy Louisiana’s 2001-vintage Louisiana state net operating loss accumulated deferred income tax that results from the Vidalia tax deduction should be excluded from the 2005 test period bandwidth calculation. Various participants filed briefs on exceptions and/or briefs opposing exceptions related to the initial decision, including the LPSC, the APSC, the FERC trial staff, and Entergy Services. The initial decision is pending before the FERC.

Rough Production Cost Equalization Rates

Each May from 2007 through 2016 Entergy filed with the FERC the rates to implement the FERC’s orders in the System Agreement proceeding.  These filings showed the following payments/receipts among the Utility operating companies were necessary to achieve rough production cost equalization as defined by the FERC’s orders:
 
Payments (Receipts)
 
2007
 
2008
 
2009
 
2010
 
2011
 
2012
 
2013
 
2014
 
(In Millions)
Entergy Arkansas

$252

 

$252

 

$390

 

$41

 

$77

 

$41

 

$—

 

$—

Entergy Louisiana

($211
)
 

($160
)
 

($247
)
 

($22
)
 

($12
)
 

($41
)
 

$—

 

$—

Entergy Mississippi

($41
)
 

($20
)
 

($24
)
 

($19
)
 

($40
)
 

$—

 

$—

 

$—

Entergy New Orleans

$—

 

($7
)
 

$—

 

$—

 

($25
)
 

$—

 

($15
)
 

($15
)
Entergy Texas

($30
)
 

($65
)
 

($119
)
 

$—

 

$—

 

$—

 

$15

 

$15



The Utility operating companies recorded accounts payable or accounts receivable to reflect the rough production cost equalization payments and receipts required to implement the FERC’s remedy.  When accounts payable were recorded, a corresponding regulatory asset was recorded for the right to collect the payments from customers. When accounts receivable were recorded, a corresponding regulatory liability was recorded for the obligations to pass the receipts on to customers.  No payments were required in 2016 or 2015 to implement the FERC’s remedy based on calendar year 2015 production costs and 2014 production costs, respectively. The System Agreement terminated in August 2016.

The APSC approved a production cost allocation rider for recovery from customers of the retail portion of the costs allocated to Entergy Arkansas.  Entergy Texas recovered its 2013 rough production cost equalization payment over three years beginning April 2014. Entergy Texas included its 2014 rough production cost equalization payment as a component of an interim fuel refund made in 2014. Management believes that any changes in the allocation of production costs resulting from the FERC’s decision and related retail proceedings should result in similar rate changes for retail customers, subject to specific circumstances that have caused trapped costs.

The following rough production cost equalization rate proceedings are still ongoing.

2010 Rate Filing Based on Calendar Year 2009 Production Costs

In May 2010, Entergy filed with the FERC the 2010 rates in accordance with the FERC’s orders in the System Agreement proceeding, and supplemented the filing in September 2010.  Several parties intervened in the proceeding at the FERC, including the LPSC and the City Council, which also filed protests.  In July 2010 the FERC accepted Entergy’s proposed rates for filing, effective June 1, 2010, subject to refund.  After an abeyance of the proceeding schedule, a hearing was held in March 2014 and in December 2015 the FERC issued an order. Among other things, the December 2015 order directed Entergy to submit a compliance filing. In January 2016 the LPSC, the APSC, and Entergy filed requests for rehearing of the FERC’s December 2015 order. In February 2016, Entergy submitted the compliance filing ordered in the December 2015 order.  The result of the true-up payments and receipts for the recalculation of production costs resulted in the following payments/receipts among the Utility operating companies:
 
Payments (Receipts)
 
(In Millions)
Entergy Arkansas
$2
Entergy Louisiana
$6
Entergy Mississippi
($4)
Entergy New Orleans
($1)
Entergy Texas
($3)

 
In September 2016 the FERC accepted the February 2016 compliance filing subject to a further compliance filing made in November 2016. The further compliance filing was required as a result of an order issued in September 2016 ruling on the January 2016 rehearing requests filed by the LPSC, the APSC, and Entergy. In the order addressing the rehearing requests, the FERC granted the LPSC’s rehearing request and directed that interest be calculated on the payment/receipt amounts. The FERC also granted the APSC’s and Entergy’s rehearing request and ordered the removal of both securitized asset accumulated deferred income taxes and contra-securitization accumulated deferred income taxes from the calculation. In November 2016, Entergy submitted its compliance filing in response to the FERC’s order on rehearing. The compliance filing included a revised refund calculation of the true-up payments and receipts based on 2009 test year data and interest calculations. The LPSC protested the interest calculations. In November 2017 the FERC issued an order rejecting the November 2016 compliance filing. The FERC determined that the payments detailed in the November 2016 compliance filing did not include adequate interest for the payments from Entergy Arkansas to Entergy Louisiana because it did not include interest on the principal portion of the payment that was made in February 2016. In December 2017, Entergy recalculated the interest pursuant to the November 2017 order. As a result of the recalculations, Entergy Arkansas owed very minor payments to Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans.

2011 Rate Filing Based on Calendar Year 2010 Production Costs

In May 2011, Entergy filed with the FERC the 2011 rates in accordance with the FERC’s orders in the System Agreement proceeding.  Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest.  In July 2011 the FERC accepted Entergy’s proposed rates for filing, effective June 1, 2011, subject to refund. After an abeyance of the proceeding schedule, in December 2014 the FERC consolidated the 2011 rate filing with the 2012, 2013, and 2014 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

2012 Rate Filing Based on Calendar Year 2011 Production Costs

In May 2012, Entergy filed with the FERC the 2012 rates in accordance with the FERC’s orders in the System Agreement proceeding.  Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest.  In August 2012 the FERC accepted Entergy’s proposed rates for filing, effective June 2012, subject to refund. After an abeyance of the proceeding schedule, in December 2014 the FERC consolidated the 2012 rate filing with the 2011, 2013, and 2014 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

2013 Rate Filing Based on Calendar Year 2012 Production Costs

In May 2013, Entergy filed with the FERC the 2013 rates in accordance with the FERC’s orders in the System Agreement proceeding. Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest. The City Council intervened and filed comments related to including the outcome of a related FERC proceeding in the 2013 cost equalization calculation. In August 2013 the FERC issued an order accepting the 2013 rates, effective June 1, 2013, subject to refund. After an abeyance of the proceeding schedule, in December 2014 the FERC consolidated the 2013 rate filing with the 2011, 2012, and 2014 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

2014 Rate Filing Based on Calendar Year 2013 Production Costs

In May 2014, Entergy filed with the FERC the 2014 rates in accordance with the FERC’s orders in the System Agreement proceeding. Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest. The City Council intervened and filed comments. In December 2014 the FERC issued an order accepting the 2014 rates, effective June 1, 2014, subject to refund, set the proceeding for hearing procedures, and consolidated the 2014 rate filing with the 2011, 2012, and 2013 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

Consolidated 2011, 2012, 2013, and 2014 Rate Filing Proceedings

As discussed above, in December 2014 the FERC consolidated the 2011, 2012, 2013, and 2014 rate filings for settlement and hearing procedures. In May 2015, Entergy filed direct testimony in the consolidated rate filings and the LPSC filed direct testimony concerning its complaint proceeding that is consolidated with the rate filings, challenging certain components of the pending bandwidth calculations for prior years. Hearings occurred in November 2015, and the ALJ issued an initial decision in July 2016. In the initial decision, the ALJ generally agreed with Entergy’s bandwidth calculations with one exception on the accounting related to the Waterford 3 sale/leaseback. Briefs were filed in September 2016 and the proceeding is pending.

Utility Operating Company Termination of System Agreement Participation

Entergy Arkansas and Entergy Mississippi ceased participating in the System Agreement effective December 18, 2013 and November 7, 2015, respectively. Entergy Louisiana, Entergy New Orleans, and Entergy Texas terminated participation in the System Agreement on August 31, 2016, which resulted in the termination of the System Agreement in its entirety pursuant to a settlement agreement approved by the FERC in December 2015.

In December 2013 the FERC set one issue for hearing involving whether and how the benefits associated with settlement with Union Pacific regarding certain coal delivery issues should be allocated among Entergy Arkansas and the other Utility operating companies post-termination of the System Agreement. In December 2014 a FERC ALJ issued an initial decision finding that Entergy Arkansas would realize benefits after December 18, 2013 from the 2008 settlement agreement between Entergy Services, Entergy Arkansas, and Union Pacific, related to certain coal delivery issues. The ALJ further found that all of the Utility operating companies should share in those benefits pursuant to a methodology proposed by the MPSC. The Utility operating companies and other parties to the proceeding filed briefs on exceptions and/or briefs opposing exceptions with the FERC challenging various aspects of the December 2014 initial decision. In March 2016 the FERC issued an opinion affirming the December 2014 initial decision with regard to the determination that there were benefits related to the Union Pacific settlement, which were realized post-Entergy Arkansas’s December 2013 withdrawal from the System Agreement, that should be shared with the other Utility operating companies utilizing the methodology proposed by the MPSC and trued-up to actual coal volumes purchased. In May 2016, Entergy made a compliance filing that provided the calculation of Union Pacific settlement benefits utilizing the methodology adopted by the initial decision, trued-up for the actual volumes of coal purchased. The payments were made in May 2016. In August 2016 the FERC issued an order accepting Entergy’s compliance filing. Also in August 2016 the APSC filed a petition for review of the FERC’s March 2016 and August 2016 orders with the U.S. Court of Appeals for the D.C. Circuit. Oral argument before the D.C. Circuit was held on the APSC’s petition in January 2018 and a decision is pending.

In connection with the System Agreement termination settlement agreement, the purchase power agreements, referred to as the jurisdictional separation plan PPAs, between Entergy Texas and Entergy Gulf States Louisiana that were put in place for certain legacy gas units at the time of Entergy Gulf States’s separation into Entergy Texas and Entergy Gulf States Louisiana terminated effective with the System Agreement termination. Similarly, the purchase power agreement between Entergy Gulf States Louisiana and Entergy Texas for the Calcasieu unit also terminated. In March 2016, Entergy Services filed with the FERC the notices of termination. The jurisdictional separation plan PPAs were the means by which Entergy Texas received payment for its receivable associated with Entergy Louisiana’s Spindletop gas storage facility regulatory asset. As a result of the System Agreement termination settlement agreement, effective with the termination date, Entergy Texas no longer receives payments from Entergy Louisiana related to the Spindletop storage facility, which resulted in a write-off recorded in 2015 by Entergy Texas of $23.5 million ($15.3 million net-of-tax). Upon termination of the System Agreement, other purchase power agreements entered into under Service Schedule MSS-4 of the System Agreement were replaced with updated agreements under a FERC-jurisdictional tariff effective September 1, 2016.

Interruptible Load Proceeding

In April 2007 the U.S. Court of Appeals for the D.C. Circuit issued its opinion in the LPSC’s appeal of the FERC’s March 2004 and April 2005 orders related to the treatment under the System Agreement of the Utility operating companies’ interruptible loads.  In its opinion the D.C. Circuit concluded that the FERC: (1) acted arbitrarily and capriciously by allowing the Utility operating companies to phase-in the effects of the elimination of the interruptible load over a 12-month period of time; (2) failed to adequately explain why refunds could not be ordered under Section 206(c) of the Federal Power Act; and (3) exercised appropriately its discretion to defer addressing the cost of sulfur dioxide allowances until a later time.  The D.C. Circuit remanded the matter to the FERC for a more considered determination on the issue of refunds.  The FERC issued its order on remand in September 2007, in which it directed Entergy to make a compliance filing removing all interruptible load from the computation of peak load responsibility commencing April 1, 2004 and to issue any necessary refunds to reflect this change.  In addition, the order directed the Utility operating companies to make refunds for the period May 1995 through July 1996.  In November 2007 the Utility operating companies filed a refund report describing the refunds to be issued pursuant to the FERC’s orders.  The LPSC filed a protest to the refund report in December 2007, and the Utility operating companies filed an answer to the protest in January 2008.  The refunds were made in October 2008 by the Utility operating companies that owed refunds to the Utility operating companies that were due refunds under the decision.  The APSC and the Utility operating companies appealed the FERC decisions to the D.C. Circuit.

Following the filing of petitioners’ initial briefs, the FERC filed a motion requesting the D.C. Circuit hold the appeal of the FERC’s decisions ordering refunds in the interruptible load proceeding in abeyance and remand the record to the FERC.  The D.C. Circuit granted the FERC’s unopposed motion in June 2009.  In December 2009 the FERC established a paper hearing to determine whether the FERC had the authority and, if so, whether it would be appropriate to order refunds resulting from changes in the treatment of interruptible load in the allocation of capacity costs by the Utility operating companies.  In August 2010 the FERC issued an order stating that it has the authority and refunds are appropriate.  The APSC, the MPSC, and Entergy requested rehearing of the FERC’s decision.  In June 2011 the FERC issued an order granting rehearing in part and denying rehearing in part, in which the FERC determined to invoke its discretion to deny refunds.  The FERC held that in this case where “the Entergy system as a whole collected the proper level of revenue, but, as was later established, incorrectly allocated peak load responsibility among the various Entergy operating companies….the Commission will apply here our usual practice in such cases, invoking our equitable discretion to not order refunds, notwithstanding our authority to do so.”  The LPSC has requested rehearing of the FERC’s June 2011 decision.  In July 2011 the refunds made in the fourth quarter 2009 described above were reversed. In October 2011 the FERC issued an “Order Establishing Paper Hearing” inviting parties that oppose refunds to file briefs within 30 days addressing the LPSC’s argument that FERC precedent supports refunds under the circumstances present in this proceeding.  Parties that favor refunds were then invited to file reply briefs within 21 days of the date that the initial briefs were due.  

In September 2010 the FERC had issued an order setting the refund report filed in the proceeding in November 2007 for hearing and settlement judge procedures.  In May 2011, Entergy filed a settlement agreement that resolved all issues relating to the refund report set for hearing.  In June 2011 the settlement judge certified the settlement as uncontested.  The settlement agreement was approved by the FERC in September 2016.

Prior to the FERC’s June 2011 order on rehearing, Entergy Arkansas filed an application in November 2010 with the APSC for recovery of the refund that it paid.  The APSC denied Entergy Arkansas’s application, and also denied Entergy Arkansas’s petition for rehearing.  If the FERC were to order Entergy Arkansas to pay refunds on rehearing in the interruptible load proceeding the APSC’s decision would trap FERC-approved costs at Entergy Arkansas with no regulatory-approved mechanism to recover them.  In August 2011, Entergy Arkansas filed a complaint in the United States District Court for the Eastern District of Arkansas asking for a declaratory judgment that the rejection of Entergy Arkansas’s application by the APSC is preempted by the Federal Power Act.  The APSC filed a motion to dismiss the complaint.  In April 2012 the United States district court dismissed Entergy Arkansas’s complaint without prejudice stating that Entergy Arkansas’s claim is not ripe for adjudication and that Entergy Arkansas did not have standing to bring suit at this time.

In March 2013 the FERC issued an order denying the LPSC’s request for rehearing of the FERC’s June 2011 order wherein the FERC concluded it would exercise its discretion and not order refunds in the interruptible load proceeding. Based on its review of the LPSC’s request for rehearing and the briefs filed as part of the paper hearing established in October 2011, the FERC affirmed its earlier ruling and declined to order refunds under the circumstances of the case. In May 2013 the LPSC filed a petition for review with the U.S. Court of Appeals for the D.C. Circuit seeking review of FERC prior orders in the interruptible load proceeding that concluded that the FERC would exercise its discretion and not order refunds in the proceeding. Oral argument was held on the appeal in the D.C. Circuit in September 2014. In December 2014 the D.C. Circuit issued an order on the LPSC’s appeal and remanded the case back to the FERC. The D.C. Circuit rejected the LPSC’s argument that there is a presumption in favor of refunds, but it held that the FERC had not adequately explained its decision to deny refunds and directed the FERC “to consider the relevant factors and weigh them against one another.” In March 2015, Entergy filed with the FERC a motion to establish a briefing schedule on remand and an initial brief on remand to address the December 2014 decision by the D.C. Circuit. The initial brief on remand argued that the FERC, in response to the D.C. Circuit decision, should clarify its policy on refunds and find that refunds are not required in the interruptible load proceeding.

In April 2016 the FERC issued an order on remand that addressed the December 2014 decision by the D.C. Circuit in the interruptible load proceeding. The order on remand affirmed the FERC’s denial of refunds for the 15-month refund effective period. The FERC explained and clarified its policies regarding refunds and concluded that the evidence in the record demonstrated that the relevant equitable factors favored not requiring refunds in this case. The FERC also noted that, under Section 206(c) of the Federal Power Act, in a Section 206 proceeding involving two or more electric utility companies of a registered holding company system, the FERC may order refunds only if it determines the refunds would not cause the registered holding company to experience any reduction in revenues resulting from an inability of an electric utility company in the system to recover the resulting increase in costs. The FERC stated it was not able to find that the Entergy system would not experience a reduction in revenues if refunds were awarded in this proceeding, which further supported the denial of refunds. In May 2016 the LPSC filed a request for rehearing of the FERC’s April 2016 order. In September 2016 the FERC issued an order denying the LPSC’s request for rehearing and reaffirming its denial of refunds for the 15-month refund effective period. The LPSC has appealed the April and September 2016 orders to the U.S. Court of Appeals for the D.C. Circuit. Oral argument before the D.C. Circuit was held before the D.C. Circuit in February 2018 and a decision is pending.
 
Entergy Arkansas Opportunity Sales Proceeding

In June 2009 the LPSC filed a complaint requesting that the FERC determine that certain of Entergy Arkansas’s sales of electric energy to third parties: (a) violated the provisions of the System Agreement that allocated the energy generated by Entergy System resources; (b) imprudently denied the Entergy System and its ultimate consumers the benefits of low-cost Entergy System generating capacity; and (c) violated the provision of the System Agreement that prohibited sales to third parties by individual companies absent an offer of a right-of-first-refusal to other Utility operating companies.   The LPSC’s complaint challenged sales made beginning in 2002 and requested refunds.  In July 2009 the Utility operating companies filed a response to the complaint requesting that the FERC dismiss the complaint on the merits without hearing because the LPSC has failed to meet its burden of showing any violation of the System Agreement and failed to produce any evidence of imprudent action by the Entergy System.  In their response, the Utility operating companies explained that the System Agreement clearly contemplates that the Utility operating companies may make sales to third parties for their own account, subject to the requirement that those sales be included in the load (or load shape) for the applicable Utility operating company.  The FERC subsequently ordered a hearing in the proceeding.

The LPSC filed direct testimony in the proceeding alleging, among other things, (1) that Entergy violated the System Agreement by permitting Entergy Arkansas to make non-requirements sales to non-affiliated third parties rather than making such energy available to the other Utility operating companies’ customers; and (2) that over the period 2000 - 2009, these non-requirements sales caused harm to the Utility operating companies’ customers and these customers should be compensated for this harm by Entergy.  In subsequent testimony, the LPSC modified its original damages claim in favor of quantifying damages by re-running intra-system bills.  The Utility operating companies believe the LPSC’s allegations are without merit.  A hearing in the matter was held in August 2010.

In December 2010 the ALJ issued an initial decision.  The ALJ found that the System Agreement allowed for Entergy Arkansas to make the sales to third parties but concluded that the sales should be accounted for in the same manner as joint account sales.  The ALJ concluded that “shareholders” should make refunds of the damages to the Utility operating companies, along with interest.  Entergy disagreed with several aspects of the ALJ’s initial decision and in January 2011 filed with the FERC exceptions to the decision.

The FERC issued a decision in June 2012 and held that, while the System Agreement is ambiguous, it does provide authority for individual Utility operating companies to make opportunity sales for their own account and Entergy Arkansas made and priced these sales in good faith.  The FERC found, however, that the System Agreement does not provide authority for an individual Utility operating company to allocate the energy associated with such opportunity sales as part of its load, but provides a different allocation authority.  The FERC further found that the after-the-fact accounting methodology used to allocate the energy used to supply the sales was inconsistent with the System Agreement.  Quantifying the effect of the FERC’s decision requires re-running intra-system bills for a ten-year period, and the FERC in its decision established further hearing procedures to determine the calculation of the effects.  In July 2012, Entergy and the LPSC filed requests for rehearing of the FERC’s June 2012 decision. A hearing was held in May 2013 to quantify the effect of repricing the opportunity sales in accordance with the FERC’s June 2012 decision.

In August 2013 the presiding judge issued an initial decision in the calculation proceeding. The initial decision concluded that the methodology proposed by the LPSC, rather than the methodologies proposed by Entergy or the FERC Staff, should be used to calculate the payments that Entergy Arkansas is to make to the other Utility operating companies. The initial decision also concluded that the other System Agreement service schedules should not be adjusted and that payments by Entergy Arkansas should not be reflected in the rough production cost equalization bandwidth calculations for the applicable years. The initial decision recognized that the LPSC’s methodology would result in an inequitable windfall to the other Utility operating companies and, therefore, concluded that any payments by Entergy Arkansas should be reduced by 20%. The LPSC, the APSC, the City Council, and FERC staff filed briefs on exceptions and/or briefs opposing exceptions. Entergy filed a brief on exceptions requesting that the FERC reverse the initial decision and a brief opposing certain exceptions taken by the LPSC and FERC staff.

In April 2016 the FERC issued orders addressing requests for rehearing filed in July 2012 and the ALJ’s August 2013 initial decision. The first order denied Entergy’s request for rehearing and affirmed the FERC’s earlier rulings that Entergy’s original methodology for allocating energy costs to the opportunity sales was incorrect and, as a result, Entergy Arkansas must make payments to the other Utility operating companies to put them in the same position that they would have been in absent the incorrect allocation. The FERC clarified that interest should be included with the payments. The second order affirmed in part, and reversed in part, the rulings in the ALJ’s August 2013 initial decision regarding the methodology that should be used to calculate the payments Entergy Arkansas is to make to the other Utility operating companies. The FERC affirmed the ALJ’s ruling that a full re-run of intra-system bills should be performed, but required that methodology be modified so that the sales have the same priority for purposes of energy allocation as joint account sales. The FERC reversed the ALJ’s decision that any payments by Entergy Arkansas should be reduced by 20%. The FERC also reversed the ALJ’s decision that adjustments to other System Agreement service schedules and excess bandwidth payments should not be taken into account when calculating the payments to be made by Entergy Arkansas. The FERC held that such adjustments and excess bandwidth payments should be taken into account, but ordered further proceedings before an ALJ to address whether a cap on any reduction due to bandwidth payments was necessary and to implement the other adjustments to the calculation methodology.

In May 2016, Entergy Services filed a request for rehearing of the FERC’s April 2016 order arguing that payments made by Entergy Arkansas should be reduced as a result of the timing of the LPSC’s approval of certain contracts. Entergy Services also filed a request for clarification and/or rehearing of the FERC’s April 2016 order addressing the ALJ’s August 2013 initial decision. The APSC and the LPSC also filed requests for rehearing of the FERC’s April 2016 order. In September 2017 the FERC issued an order denying the request for rehearing on the issue of whether any payments by Entergy Arkansas to the other Utility operating companies should be reduced due to the timing of the LPSC’s approval of Entergy Arkansas’s wholesale baseload contract with Entergy Louisiana. In November 2017 the FERC issued an order denying all of the remaining requests for rehearing of the April 2016 order. In November 2017, Entergy Services filed a petition for review in the D.C. Circuit of the FERC’s orders in the first two phases of the opportunity sales case. In December 2017 the D.C. Circuit granted Entergy Services’s request to hold the appeal in abeyance pending final resolution of the related proceeding still pending with the FERC. In January 2018 the APSC and the LPSC filed separate petitions for review in the D.C. Circuit, and the D.C. Circuit consolidated the appeals with Entergy Services’s appeal and held all of the appeals in abeyance.

Pursuant to the procedural schedule established in the case, Entergy Services re-ran intra-system bills for the ten-year period 2000-2009 to quantify the effects of the FERC's ruling. In November 2016 the LPSC submitted testimony disputing certain aspects of the calculations. A hearing was held in May 2017. In July 2017, the ALJ issued an initial decision concluding that Entergy Arkansas should pay $86 million plus interest to the other Utility operating companies. In August 2017 the Utility operating companies, the LPSC, the APSC, and FERC staff filed individual briefs on exceptions challenging various aspects of the initial decision. In September 2017 the Utility operating companies, the LPSC, the APSC, the MPSC, the City Council, and FERC staff filed separate briefs opposing exceptions taken by various parties. The case is pending before the FERC. No payments will be made or received by the Utility operating companies until the FERC issues an order reviewing the initial decision and Entergy submits a subsequent filing to comply with that order.

The effect of the FERC’s decisions thus far in the case would be that Entergy Arkansas will make payments to some or all of the other Utility operating companies. Because further proceedings will still occur in the case, the amount and recipients of payments by Entergy Arkansas are unknown at this time. Based on testimony previously submitted in the case and its assessment of the April 2016 FERC orders, in the first quarter 2016, Entergy Arkansas recorded a liability of $87 million, which includes interest, for its estimated increased costs and payment to the other Utility operating companies. This estimate is subject to change depending on how the FERC resolves the issues that are still outstanding in the case, including its review of the July 2017 initial decision. Entergy Arkansas’s increased costs will be attributed to Entergy Arkansas’s retail and wholesale businesses, and it is not probable that Entergy Arkansas will recover the wholesale portion. Entergy Arkansas, therefore, recorded a deferred fuel regulatory asset in the first quarter 2016 of approximately $75 million, which represents its estimate of the retail portion of the costs. Following its assessment of the course of the proceedings, including the FERC’s denial of rehearing in November 2017 described above, in the fourth quarter 2017, Entergy Arkansas recorded an additional liability of $35 million and a regulatory asset of $31 million. Because management currently expects to recover the retail portion of the costs through a base rate proceeding or newly proposed rider, the regulatory asset is reflected as Other regulatory assets as of December 31, 2017.
    
Complaint Against System Energy

In January 2017 the APSC and MPSC filed a complaint with the FERC against System Energy. The complaint seeks a reduction in the return on equity component of the Unit Power Sales Agreement pursuant to which System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. Entergy Arkansas also sells some of its Grand Gulf capacity and energy to Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under separate agreements. The current return on equity under the Unit Power Sales Agreement is 10.94%. The complaint alleges that the return on equity is unjust and unreasonable because current capital market and other considerations indicate that it is excessive. The complaint requests the FERC to institute proceedings to investigate the return on equity and establish a lower return on equity, and also requests that the FERC establish January 23, 2017 as a refund effective date. The complaint includes return on equity analysis that purports to establish that the range of reasonable return on equity for System Energy is between 8.37% and 8.67%. System Energy answered the complaint in February 2017 and disputes that a return on equity of 8.37% to 8.67% is just and reasonable. The LPSC and the City Council intervened in the proceeding expressing support for the complaint. System Energy is recording a provision against revenue for the potential outcome of this proceeding. In September 2017 the FERC established a refund effective date of January 23, 2017, consolidated the return on equity complaint with the proceeding described in Unit Power Sales Agreement below, and directed the parties to engage in settlement proceedings before an ALJ. If the parties fail to come to an agreement during settlement proceedings, a prehearing conference will be held to establish a procedural schedule for hearing proceedings.

Unit Power Sales Agreement

In August 2017, System Energy submitted to the FERC proposed amendments to the Unit Power Sales Agreement pursuant to which System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. The filing proposes limited amendments to the Unit Power Sales Agreement to adopt (1) updated rates for use in calculating Grand Gulf plant depreciation and amortization expenses and (2) updated nuclear decommissioning cost annual revenue requirements, both of which are recovered through the Unit Power Sales Agreement rate formula. The proposed amendments would result in lower charges to the Utility operating companies that buy capacity and energy from System Energy under the Unit Power Sales Agreement. The proposed changes are based on updated depreciation and nuclear decommissioning studies that take into account the renewal of Grand Gulf’s operating license for a term through November 1, 2044. System Energy requested that the FERC accept the amendments effective October 1, 2017.

In September 2017 the FERC accepted System Energy’s proposed Unit Power Sales Agreement amendments, subject to further proceedings to consider the justness and reasonableness of the amendments. Because the amendments propose a rate decrease, the FERC also initiated an investigation under Section 206 of the Federal Power Act to determine if the rate decrease should be lower than proposed. The FERC accepted the proposed amendments effective October 1, 2017, subject to refund pending the outcome of the further settlement and/or hearing proceedings, and established a refund effective date of October 11, 2017 with respect to the rate decrease. The FERC also consolidated the Unit Power Sales Agreement amendment proceeding with the proceeding described in Complaint Against System Energy above, and directed the parties to engage in settlement proceedings before an ALJ. If the parties fail to come to an agreement during settlement proceedings, a prehearing conference will be held to establish a procedural schedule for hearing proceedings.

Storm Cost Recovery Filings with Retail Regulators

Entergy Louisiana

Hurricane Isaac

In August 2012, Hurricane Isaac caused extensive damage to Entergy Louisiana’s service area.  The storm resulted in widespread power outages, significant damage primarily to distribution infrastructure, and the loss of sales during the power outages.  In June 2014 the LPSC authorized Entergy Louisiana to utilize Louisiana Act 55 financing for Hurricane Isaac system restoration costs.  Entergy Louisiana committed to pass on to customers a minimum of $30.8 million of customer benefits through annual customer credits of approximately $6.2 million for five years. Approvals for the Act 55 financings were obtained from the Louisiana Utilities Restoration Corporation (LURC) and the Louisiana State Bond Commission.

In August 2014 the Louisiana Local Government Environmental Facilities and Community Development Authority (LCDA) issued $314.85 million in bonds under Louisiana Act 55.  From the $309 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $16 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $293 million directly to Entergy Louisiana.  Entergy Louisiana used the $293 million received from the LURC to acquire 2,935,152.69 Class C preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 7.5% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2014, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement. The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1.75 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC, and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

Hurricane Gustav and Hurricane Ike

In September 2008, Hurricane Gustav and Hurricane Ike caused catastrophic damage to Entergy Louisiana’s service territory.  In December 2009, Entergy Louisiana entered into a stipulation agreement with the LPSC staff regarding its storm costs.  In March and April 2010, Entergy Louisiana and other parties to the proceeding filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal to utilize Act 55 financing, which included a commitment to pass on to customers a minimum of $43.3 million of customer benefits through a prospective annual rate reduction of $8.7 million for five years.  In April 2010 the LPSC approved the settlement and subsequently issued financing orders and a ratemaking order intended to facilitate the implementation of the Act 55 financings.  In June 2010 the Louisiana State Bond Commission approved the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricane Gustav and Hurricane Ike was reduced by $2.7 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2010, the LCDA issued two series of bonds totaling $713.0 million under Act 55.  From the $702.7 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $290 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $412.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana used $412.7 million to acquire 4,126,940.15 Class B preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 9% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2010, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA, and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC, and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.
Hurricane Katrina and Hurricane Rita

In August and September 2005, Hurricanes Katrina and Rita caused catastrophic damage to Entergy Louisiana’s service territory. In March 2008, Entergy Louisiana and the LURC filed at the LPSC an application requesting that the LPSC grant a financing order authorizing the financing of Entergy Louisiana storm costs, storm reserves, and issuance costs pursuant to Louisiana Act 55.  The Louisiana Act 55 financing is expected to produce additional customer benefits as compared to traditional securitization.  Entergy Louisiana also filed an application requesting LPSC approval for ancillary issues including the mechanism to flow charges and savings to customers via a storm cost offset rider.  In April 2008 the Louisiana Public Facilities Authority (LPFA), which is the issuer of the bonds pursuant to the Act 55 financing, approved requests for the Act 55 financing.  Also in April 2008, Entergy Louisiana and the LPSC staff filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal under the Act 55 financing, which included a commitment to pass on to customers a minimum of $40 million of customer benefits through a prospective annual rate reduction of $8 million for five years.  The LPSC subsequently approved the settlement and issued two financing orders and one ratemaking order intended to facilitate implementation of the Act 55 financing.  In May 2008 the Louisiana State Bond Commission granted final approval of the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricanes Katrina and Rita was reduced by $22.3 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2008 the LPFA issued $687.7 million in bonds under the aforementioned Act 55.  From the $679 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $152 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $527 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $545 million, including $17.8 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 5,449,861.85 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 10% annual distribution rate.  In August 2008, the LPFA issued $278.4 million in bonds under the aforementioned Act 55.  From the $274.7 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $87 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $187.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $189.4 million, including $1.7 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 1,893,918.39 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC that carry a 10% annual distribution rate.  Distributions are payable quarterly commencing on September 15, 2008 and have a liquidation price of $100 per unit.  The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.  In February 2012, Entergy Louisiana sold 500,000 of its Class A preferred membership units in Entergy Holdings Company LLC, a wholly-owned Entergy subsidiary, to a third party in exchange for $51 million plus accrued but unpaid distributions on the units.  The 500,000 preferred membership units are mandatorily redeemable in January 2112.

Entergy and Entergy Louisiana do not report the bonds issued by the LPFA on their balance sheets because the bonds are the obligation of the LPFA, and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC, and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

Entergy Mississippi

Entergy Mississippi has approval from the MPSC to collect a storm damage provision of $1.75 million per month. If Entergy Mississippi’s accumulated storm damage provision balance exceeds $15 million, the collection of the storm damage provision ceases until such time that the accumulated storm damage provision becomes less than $10 million. As of April 30, 2016, Entergy Mississippi’s storm damage provision balance was less than $10 million, therefore Entergy Mississippi resumed billing the monthly storm damage provision effective with June 2016 bills. As of September 30, 2016, however, Entergy Mississippi’s storm damage provision balance again exceeded $15 million. Accordingly the storm damage provision was reset to zero beginning with November 2016 bills. As of July 31, 2017, the balance in Entergy Mississippi’s accumulated storm damage provision was again less than $10 million, therefore Entergy Mississippi resumed billing the monthly storm damage provision effective with September 2017 bills.

Entergy New Orleans

In August 2012, Hurricane Isaac caused extensive damage to Entergy New Orleans’s service area. In January 2015 the City Council issued a resolution approving the terms of a joint agreement in principle filed by Entergy New Orleans, Entergy Louisiana, and the City Council Advisors determining, among other things, that Entergy New Orleans’s prudently-incurred storm recovery costs were $49.3 million, of which $31.7 million, net of reimbursements from the storm reserve escrow account, remained recoverable from Entergy New Orleans’s electric customers. The resolution also directed Entergy New Orleans to file an application to securitize the unrecovered City Council-approved storm recovery costs of $31.7 million pursuant to the Louisiana Electric Utility Storm Recovery Securitization Act (Louisiana Act 64). In addition, the resolution found that it was reasonable for Entergy New Orleans to include in the principal amount of its potential securitization the costs to fund and replenish Entergy New Orleans’s storm reserve in an amount that achieved the City Council-approved funding level of $75 million. In January 2015, in compliance with that directive, Entergy New Orleans filed with the City Council an application requesting that the City Council grant a financing order authorizing the financing of Entergy New Orleans’s storm costs, storm reserves, and issuance costs pursuant to Louisiana Act 64. In May 2015 the parties entered into an agreement in principle and the City Council issued a financing order authorizing Entergy New Orleans to issue storm recovery bonds in the aggregate amount of $98.7 million, including $31.8 million for recovery of Entergy New Orleans’s Hurricane Isaac storm recovery costs, including carrying costs, $63.9 million to fund and replenish Entergy New Orleans’s storm reserve, and approximately $3 million for estimated up-front financing costs associated with the securitization. See Note 5 to the financial statements for discussion of the issuance of the securitization bonds in July 2015.

New Nuclear Generation Development Costs

Entergy Louisiana

Entergy Louisiana and Entergy Gulf States Louisiana were developing a project option for new nuclear generation at River Bend.  In March 2010, Entergy Louisiana and Entergy Gulf States Louisiana filed with the LPSC seeking approval to continue the limited development activities necessary to preserve an option to construct a new unit at River Bend.  At its June 2012 meeting the LPSC voted to uphold an ALJ recommendation that the request of Entergy Louisiana and Entergy Gulf States Louisiana be declined on the basis that the LPSC’s rule on new nuclear development does not apply to activities to preserve an option to develop and on the further grounds that the companies improperly engaged in advanced preparation activities prior to certification.  The LPSC directed that Entergy Louisiana and Entergy Gulf States Louisiana be permitted to seek recovery of these costs in their upcoming rate case filings that were subsequently filed in February 2013. In the resolution of the rate case proceeding the LPSC provided for an eight-year amortization of costs incurred in connection with the potential development of new nuclear generation at River Bend, without carrying costs, beginning in December 2014, provided, however, that amortization of these costs shall not result in a future rate increase. As of December 31, 2017, Entergy Louisiana has a regulatory asset of $35.8 million on its balance sheet related to these new nuclear generation development costs.
Entergy New Orleans [Member]  
Rate And Regulatory Matters
RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)
 
Regulatory Assets and Regulatory Liabilities

Regulatory assets represent probable future revenues associated with costs that Entergy expects to recover from customers through the regulatory ratemaking process under which the Utility business operates. Regulatory liabilities represent probable future reductions in revenues associated with amounts that Entergy expects to benefit customers through the regulatory ratemaking process under which the Utility business operates. In addition to the regulatory assets and liabilities that are specifically disclosed on the face of the balance sheets, the tables below provide detail of “Other regulatory assets” and “Other regulatory liabilities” that are included on Entergy’s and the Registrant Subsidiaries’ balance sheets as of December 31, 2017 and 2016:
 
Other Regulatory Assets

Entergy
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$2,642.3

 

$2,635.5

Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
746.0

 
677.2

Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 2 – Storm Cost Recovery Filings with Retail Regulators) (Note 5)
558.9

 
637.0

Removal costs - recovered through depreciation rates (Note 9) (a)
436.5

 
353.9

Opportunity Sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding)
109.8

 

Retail rate deferrals - recovered through rate riders as rates are redetermined by retail regulators
86.4

 
22.1

Unamortized loss on reacquired debt - recovered over term of debt
82.9

 
91.4

Little Gypsy costs – recovered through securitization (Note 5 – Entergy Louisiana Securitization Bonds - Little Gypsy)
73.7

 
100.0

Transition to competition costs - recovered over a 15-year period through February 2021
37.7

 
47.9

New nuclear generation development costs (Note 2 - New Nuclear Generation Development Costs) (b)
36.4

 
43.7

Other
125.1

 
161.2

Entergy Total

$4,935.7

 

$4,769.9



Entergy Arkansas
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$757.0

 

$786.6

Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
345.2

 
322.9

Removal costs - recovered through depreciation rates (Note 9) (a)
176.9

 
128.5

Opportunity sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding)
109.8

 

Storm damage costs - recovered either through securitization or retail rates (Note 5 - Entergy Arkansas Securitization Bonds)
76.2

 
88.9

Retail rate deferrals - recovered through rate riders as rates are redetermined annually
28.2

 
10.1

Unamortized loss on reacquired debt - recovered over term of debt
24.3

 
27.6

ANO Fukushima and Flood Barrier costs - recovered through retail rates through February 2026 (Note 2 - Retail Rate Proceedings) (b)
14.4

 
16.1

Lake Catherine 4 reliability and sustainability cost deferral - recovery through retail rates (b)
8.9

 
9.8

Incremental ice storm costs - recovered through 2032
7.4

 
7.9

MISO costs - recovery through retail rates through 2018 (Note 2 - Retail Rate Proceedings) (b)
5.5

 
11.1

Human capital management costs - recovery through retail rates through August 2019 (Note 2 - Retail Rate Proceedings) (b)
4.4

 
7.0

Other
9.2

 
11.5

Entergy Arkansas Total

$1,567.4

 

$1,428.0



Entergy Louisiana
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans and Non-Qualified Pension Plans) (a)

$724.6

 

$715.7

Asset Retirement Obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
218.6

 
199.4

Little Gypsy costs – recovered through securitization (Note 5 – Entergy Louisiana Securitization Bonds - Little Gypsy)
71.4

 
97.8

New nuclear generation development costs - recovery through formula rate plan beginning December 2014 through November 2022 (Note 2 - New Nuclear Generation Development Costs) (b)
35.8

 
43.1

Unamortized loss on reacquired debt - recovered over term of debt
24.7

 
27.0

Storm damage costs - recovered through retail rates (Note 2 - Storm Cost Recovery Filings with Retail Regulators)
14.3

 

Business combination external costs deferral - recovery through formula rate plan beginning December 2015 through November 2025 (b)
14.1

 
15.2

River Bend AFUDC - recovered through August 2025 (Note 1 – River Bend AFUDC)
12.9

 
14.8

Other
29.4

 
55.1

Entergy Louisiana Total

$1,145.8

 

$1,168.1



Entergy Mississippi
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$218.7

 

$217.2

Removal costs - recovered through depreciation rates (Note 9) (a)
91.6

 
82.0

Retail rate deferrals - recovered through rate riders as rates are redetermined annually
49.4

 
9.3

Unamortized loss on reacquired debt - recovered over term of debt
17.6

 
18.9

Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
7.6

 
7.2

Other
13.0

 
7.6

Entergy Mississippi Total

$397.9

 

$342.2



Entergy New Orleans
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$102.8

 

$108.8

Storm damage costs, including hurricane costs - recovered through retail rates and securitization (Note 2 - Storm Cost Recovery Filings with Retail Regulators)
82.3

 
93.6

Removal costs - recovered through depreciation rates (Note 9) (a)
44.8

 
40.1

Retail rate deferrals - recovered through rate riders as rates are redetermined monthly or annually
4.4

 
4.3

Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
4.3

 
4.2

Unamortized loss on reacquired debt - recovered over term of debt
3.0

 
3.4

Rate case costs - recovered over a 6-year period through September 2021 (Note 2 - Retail Rate Proceedings)
2.6

 
3.0

Michoud plant maintenance – recovered over a 7-year period through September 2018
1.4

 
3.3

Other
5.8

 
7.4

Entergy New Orleans Total

$251.4

 

$268.1



Entergy Texas
 
2017
 
2016
 
(In Millions)
Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 5 - Entergy Texas Securitization Bonds)

$386.1

 

$442.4

Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
169.2

 
201.7

Transition to competition costs - recovered over a 15-year period through February 2021
37.7

 
47.9

Removal costs - recovered through depreciation rates (Note 9) (a)
55.2

 
33.5

Unamortized loss on reacquired debt - recovered over term of debt
8.7

 
9.0

Other
4.5

 
5.7

Entergy Texas Total

$661.4

 

$740.2



System Energy
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans and Other Postretirement Benefits) (a)

$202.7

 

$193.5

Asset retirement obligation - recovery dependent upon timing of decommissioning (Note 9) (a)
169.1

 
142.5

Removal costs - recovered through depreciation rates (Note 9) (a)
67.9

 
69.7

Unamortized loss on reacquired debt - recovered over term of debt
4.6

 
5.5

System Energy Total

$444.3

 

$411.2



(a)
Does not earn a return on investment, but is offset by related liabilities.
(b)
Does not earn a return on investment.
Other Regulatory Liabilities

Entergy
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)

$989.3

 

$735.5

Vidalia purchased power agreement (Note 8) (b)
151.6

 
202.4

Louisiana Act 55 financing savings obligation (Note 2 - Storm Cost Recovery Filings with Retail Regulators) (b)
124.8

 
165.5

Grand Gulf sale-leaseback - (Note 10 - Sale and Leaseback Transactions)
67.9

 
67.9

Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates beginning December 2015 through November 2024 (Note 2 - Entergy Louisiana and Entergy Gulf States Louisiana Business Combination)
65.8

 
83.5

Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4

 
44.4

Asset retirement obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
36.7

 
32.7

Removal costs - returned to customers through depreciation rates (Note 9) (a)
32.4

 
53.9

Entergy Mississippis accumulated accelerated Grand Gulf amortization - amortized and credited through the Unit Power Sales Agreement
32.1

 
39.3

Waterford 3 replacement steam generator provision (Note 2 - Retail Rate Proceedings)

 
68.0

Other
43.5

 
79.8

Entergy Total

$1,588.5

 

$1,572.9


Entergy Arkansas
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)

$354.0

 

$280.8

Other
9.6

 
25.1

Entergy Arkansas Total

$363.6

 

$305.9



Entergy Louisiana
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)

$323.7

 

$235.4

Vidalia purchased power agreement (Note 8) (b)
151.6

 
202.4

Louisiana Act 55 financing savings obligation (Note 2 - Storm Cost Recovery Filings with Retail Regulators) (b)
124.8

 
165.5

Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates beginning December 2015 through November 2024 (Note 2 - Entergy Louisiana and Entergy Gulf States Louisiana Business Combination)
65.8

 
83.5

Gas hedging costs - refunded through fuel rates (Note 15 - Derivatives)

 
10.9

Asset Retirement Obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
36.7

 
32.7

Removal costs - returned to customers through depreciation rates (Note 9) (a)
32.4

 
53.9

Waterford 3 replacement steam generator provision (Note 2 - Retail Rate Proceedings)

 
68.0

Other
26.1

 
28.7

Entergy Louisiana Total

$761.1

 

$881.0



Entergy Texas
 
2017
 
2016
 
(In Millions)
Transition to competition costs - returned to customers through rate riders when rates are redetermined periodically

$4.8

 

$6.2

Other
2.1

 
2.3

Entergy Texas Total

$6.9

 

$8.5


System Energy
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 17) (a)

$311.6

 

$219.3

Grand Gulf sale-leaseback - (Note 10 - Sale and Leaseback Transactions)
67.9

 
67.9

Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4

 
44.4

Entergy Mississippis accumulated accelerated Grand Gulf amortization - amortized and credited through the Unit Power Sales Agreement
32.1

 
39.3

System Energy Total

$456.0

 

$370.9



(a)
Offset by related asset.
(b)
As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21% effective January 2018, the Vidalia purchased power agreement regulatory liability was reduced by $30.5 million and the Louisiana Act 55 financing savings obligation regulatory liabilities were reduced by $25.0 million, with corresponding increases to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

Regulatory activity regarding the Tax Cuts and Jobs Act

See the “Other Tax Matters - Tax Cuts and Jobs Act” section in Note 3 to the financial statements for discussion of the effects of the enactment of the Tax Cuts and Jobs Act, in December 2017, including its effects on Entergy’s and the Registrant Subsidiaries’ regulatory asset/liability for income taxes.

After enactment of the Tax Cuts and Jobs Act the APSC issued an order that applies to investor-owned utilities in Arkansas, including Entergy Arkansas. The order requests information regarding certain effects of the Tax Cuts and Jobs Act and requires the utilities to begin, effective January 1, 2018, to record regulatory liabilities to record the effects of the Act, subject to review by the APSC, although the order acknowledges that the exact amount of tax savings and rate reductions cannot be determined at this time. Entergy Arkansas requested clarification or, in the alternative, rehearing regarding the requirement to record a regulatory liability, and also responded to the request for information. In its request for clarification Entergy Arkansas sought clarification that the amount of any regulatory liability would be determined only after the utilities are heard and present evidence on the issue, as this otherwise would be arbitrary and could implicate single-issue and retroactive ratemaking. The APSC has not responded to the request for clarification. In its response to the APSC’s request for information Entergy Arkansas states that its formula rate plan rider already provides the means for customers to realize the benefits of the Act, except for the return of unprotected excess accumulated deferred income taxes. Entergy Arkansas’s next formula rate plan filing is scheduled for July 2018. Entergy Arkansas intends to return unprotected excess accumulated deferred income taxes as expeditiously as possible, subject to a subsequent request to be made by Entergy Arkansas and approval by the APSC.

After enactment of the Tax Cuts and Jobs Act the LPSC passed an agenda item requiring utilities, including Entergy Louisiana, to file reports regarding certain effects of the Act. Entergy Louisiana responded to the directive and stated in its response that it is working with the LPSC staff and other interested parties to extend its formula rate plan such that its next base rate change will occur effective September 2018, or it would file a base rate case. Entergy Louisiana went on to state that if the formula rate plan is extended Entergy Louisiana’s next adjustment of rates will reflect the new 21% federal corporate income tax rate. Entergy Louisiana stated that it is working with the LPSC staff and interested parties to determine when the tax rate reduction will be reflected in rates, along with when and how the excess accumulated deferred income taxes will be reflected in rates, and how certain tax sharing agreement customer credits will be adjusted. On February 21, 2018, the LPSC issued a special order requiring that all LPSC-jurisdictional utilities, beginning as of January 1, 2018, record as a regulatory liability (deferred liability) the amount required to reflect the reduction in the federal corporate income tax rate from 35% to 21% and the associated savings in excess accumulated deferred income taxes until such time as its rates are changed by the LPSC to reflect these federal tax savings. In the same special order, the LPSC also initiated a new rulemaking docket to consider these issues and the appropriate manner in which to flow through the benefits to Louisiana customers and to provide an opportunity for discovery and comments of jurisdictional utilities and other interested stakeholders. The rulemaking further requires the LPSC staff to report back to the LPSC as soon as practicable and preferably by the March 21, 2018, LPSC Business and Executive Session with recommendations as to how the federal tax-related benefits will be flowed through to Louisiana customers.

After enactment of the Tax Cuts and Jobs Act the MPSC ordered utilities, including Entergy Mississippi, that operate under a formula rate plan to file a description by February 26, 2018, of how the Act will be reflected in the formula rate plan under which the utility operates. In addition to the description that is due February 26, 2018, Entergy Mississippi’s formula rate plan 2018 test year filing is scheduled to be filed by March 15, 2018.

After enactment of the Tax Cuts and Jobs Act the City Council passed a resolution ordering Entergy New Orleans to, effective January 1, 2018, record deferred regulatory liabilities to account for the Act’s effect on Entergy New Orleans’s revenue requirement and to make a filing by mid-March 2018 regarding the Act’s effects on Entergy New Orleans’s operating income and rate base and potential mechanisms for customers to receive benefits of the Act. The resolution also directed Entergy New Orleans to request that Entergy Services file with the FERC for revisions of the Unit Power Sales Agreement and MSS-4 replacement tariffs to address the return of excess accumulated deferred income taxes. Entergy plans to make such filings with the FERC by the end of March 2018.
After enactment of the Tax Cuts and Jobs Act the PUCT issued an order requiring most utilities, including Entergy Texas, beginning January 25, 2018, to record a regulatory liability for the difference between revenues collected under existing rates and revenues that would have been collected had existing rates been set using the new federal income tax rates and also for the balance of excess accumulated deferred income taxes. The order also directs the PUCT staff to investigate each investor-owned utility on a case-by-case basis to determine the appropriate mechanism to adjust its rates to reflect the changes under the Act. In both a memorandum issued prior to the open meeting when the order was discussed and during the discussions at the open meeting discussing the order, the PUCT indicated that it would consider utility earnings in determining the treatment of the liability and the effects of the Act. Entergy Texas had previously provided information to the PUCT Staff in the docket and stated that it expects the PUCT to address the lower tax expense as part of Entergy Texas’s rate case expected to be filed in May 2018. Entergy Texas also stated that it would be inappropriate for the PUCT to require a refund of the reduction in income tax expense in 2018 resulting from the Act on a retroactive basis and without a comprehensive review of Entergy Texas’s cost of service and earned return on equity. In a subsequent order issued following the February 2018 open meeting, the PUCT clarified that carrying costs need not be recorded as part of the regulatory liability.

The Registrant Subsidiaries will continue to work with their respective regulators to determine the appropriate path forward in each jurisdiction regarding the effects of the Act.

Fuel and purchased power cost recovery

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas are allowed to recover fuel and purchased power costs through fuel mechanisms included in electric and gas rates that are recorded as fuel cost recovery revenues.  The difference between revenues collected and the current fuel and purchased power costs is generally recorded as “Deferred fuel costs” on the Utility operating companies’ financial statements.  The table below shows the amount of deferred fuel costs as of December 31, 2017 and 2016 that Entergy expects to recover (or return to customers) through fuel mechanisms, subject to subsequent regulatory review.
 
2017
 
2016
 
(In Millions)
Entergy Arkansas (a)

$130.4

 

$163.6

Entergy Louisiana (b)

$96.7

 

$119.9

Entergy Mississippi

$32.4

 

$7.0

Entergy New Orleans (b)

($3.7
)
 

$8.9

Entergy Texas

($67.3
)
 

($54.5
)

(a)
Includes $67.1 million in 2017 and $66.9 million in 2016 of fuel and purchased power costs, which do not currently earn a return on investment and whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.
(b)
Includes $168.1 million in each year for Entergy Louisiana and $4.1 million in each year for Entergy New Orleans of fuel, purchased power, and capacity costs, which do not currently earn a return on investment and whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.

Entergy Arkansas

Production Cost Allocation Rider

The APSC approved a production cost allocation rider for recovery from customers of the retail portion of the costs allocated to Entergy Arkansas as a result of the System Agreement proceedings, which are discussed in the “System Agreement Cost Equalization Proceedings” section below.  These costs cause an increase in Entergy Arkansas’s deferred fuel cost balance because Entergy Arkansas pays the costs over seven months but collects the costs from customers over twelve months.

In May 2014, Entergy Arkansas filed its annual redetermination of the production cost allocation rider to recover the $3 million unrecovered retail balance as of December 31, 2013 and the $67.8 million System Agreement bandwidth remedy payment made in May 2014 as a result of the compliance filing pursuant to the FERC’s February 2014 orders related to the bandwidth payments/receipts for the June - December 2005 period. In January 2015 the APSC issued an order approving Entergy Arkansas’s request for recovery of the $3 million under-recovered amount based on the true-up of the production cost allocation rider and the $67.8 million May 2014 System Agreement bandwidth remedy payment subject to refund with interest, with recovery of these payments concluding with the last billing cycle in December 2015. The APSC also found that Entergy Arkansas is entitled to carrying charges pursuant to the current terms of the production cost allocation rider. Entergy Arkansas made its compliance filing pursuant to the order in January 2015 and the APSC issued its approval order, also in January 2015. The redetermined rate went into effect with the first billing cycle of February 2015.

In May 2015, Entergy Arkansas filed its annual redetermination of the production cost allocation rider, which included a $38 million payment made by Entergy Arkansas as a result of the FERC’s February 2014 order related to the comprehensive bandwidth recalculation for calendar year 2006, 2007, and 2008 production costs. The redetermined rate for the 2015 production cost allocation rider update was added to the redetermined rate from the 2014 production cost allocation rider update and the combined rate was effective with the first billing cycle of July 2015. This combined rate was effective through December 2015. The collection of the remainder of the redetermined rate for the 2015 production cost allocation rider update continued through June 2016.

In May 2016, Entergy Arkansas filed its annual redetermination pursuant to the production cost allocation rider, which reflected recovery of the production cost allocation rider true-up adjustment of the 2014 and 2015 unrecovered retail balance in the amount of $1.9 million. Additionally, the redetermined rates reflected the recovery of a $1.9 million System Agreement bandwidth remedy payment resulting from a compliance filing pursuant to the FERC’s December 2015 order related to test year 2009 production costs. The rates for the 2016 production cost allocation rider update became effective with the first billing cycle of July 2016, and the rates were effective through June 2017.

In May 2017, Entergy Arkansas filed its annual redetermination pursuant to the production cost allocation rider, which reflected a credit amount of $0.3 million resulting from a compliance filing pursuant to the FERC’s September 2016 order. Additionally, the redetermined rate reflected recovery of the production cost allocation rider true-up adjustment of the 2016 unrecovered retail balance in the amount of $0.3 million. Because of the small effect of the 2017 production cost allocation rider update, Entergy Arkansas proposed to reduce the effective period of the update to one month, July 2017. After the one month collection period, rates were set to zero for all rate classes for the period August 2017 through June 2018.

Energy Cost Recovery Rider

Entergy Arkansas’s retail rates include an energy cost recovery rider to recover fuel and purchased energy costs in monthly customer bills.  The rider utilizes the prior calendar-year energy costs and projected energy sales for the twelve-month period commencing on April 1 of each year to develop an energy cost rate, which is redetermined annually and includes a true-up adjustment reflecting the over- or under-recovery, including carrying charges, of the energy costs for the prior calendar year.  The energy cost recovery rider tariff also allows an interim rate request depending upon the level of over- or under-recovery of fuel and purchased energy costs.

In January 2014, Entergy Arkansas filed a motion with the APSC relating to its redetermination of its energy cost rate that was subsequently filed in March 2014. In that motion, Entergy Arkansas requested that the APSC authorize Entergy Arkansas to exclude $65.9 million of deferred fuel and purchased energy costs incurred in 2013 from the redetermination of its 2014 energy cost rate. The $65.9 million is an estimate of the incremental fuel and replacement energy costs that Entergy Arkansas incurred as a result of the ANO stator incident. Entergy Arkansas requested that the APSC authorize Entergy Arkansas to retain that amount in its deferred fuel balance, with recovery to be reviewed in a later period after more information is available regarding various claims associated with the ANO stator incident. The APSC approved Entergy Arkansas’s request in February 2014. In July 2017, Entergy Arkansas filed for a change in rates pursuant to its formula rate plan rider. In that docket, the APSC approved a settlement agreement agreed upon by the parties, including a provision that requires Entergy Arkansas to initiate a docket for the purpose of recovering funds currently withheld from rates and related to the stator incident, including the $65.9 million of deferred fuel and purchased energy costs previously noted, subject to certain timelines and conditions set forth in the settlement agreement. See the “ANO Damage, Outage, and NRC Reviews” section in Note 8 to the financial statements for further discussion of the ANO stator incident.

In March 2017, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01164 per kWh to $0.01547 per kWh. The APSC staff filed testimony in March 2017 recommending that the redetermined rate be implemented with the first billing cycle of April 2017 under the normal operation of the tariff. Accordingly, the redetermined rate went into effect on March 31, 2017 pursuant to the tariff. In July 2017 the Arkansas Attorney General requested additional information to support certain of the costs included in Entergy Arkansas’s 2017 energy cost rate redetermination.

Entergy Louisiana

Entergy Louisiana recovers electric fuel and purchased power costs for the billing month based upon the level of such costs incurred two months prior to the billing month. Entergy Louisiana’s purchased gas adjustments include estimates for the billing month adjusted by a surcharge or credit that arises from an annual reconciliation of fuel costs incurred with fuel cost revenues billed to customers, including carrying charges.

In April 2010 the LPSC authorized its staff to initiate an audit of Entergy Louisiana’s fuel adjustment clause filings.  The audit included a review of the reasonableness of charges flowed through the fuel adjustment clause by Entergy Louisiana for the period from 2005 through 2009.  The LPSC staff issued its audit report in January 2013.  The LPSC staff recommended that Entergy Louisiana refund approximately $1.9 million, plus interest, to customers and realign the recovery of approximately $1 million from Entergy Louisiana’s fuel adjustment clause to base rates.  The recommended refund was made by Entergy Louisiana in May 2013 in the form of a credit to customers through its fuel adjustment clause filing. In October 2016 the LPSC staff filed testimony affirming the recommendation in its audit report on the lone remaining issue that nuclear dry fuel storage costs should be realigned to base rates. The parties agreed to remove that remaining issue to a separate docket because the same issue was outstanding in the Entergy Gulf States Louisiana audit for the same time period. In November 2016 the LPSC approved the resolution of this audit and the creation of a new docket for the resolution of the proper method of recovery for nuclear dry fuel storage costs. In December 2016 the LPSC opened a new docket in order to resolve the issue regarding the proper methodology for the recovery of nuclear dry fuel storage costs. In October 2017 the LPSC approved the continued recovery of the nuclear dry fuel storage costs through the fuel adjustment clause, resolving the open issue in the audit.

In December 2011 the LPSC authorized its staff to initiate a proceeding to audit the fuel adjustment clause filings of Entergy Gulf States Louisiana and its affiliates.  The audit included a review of the reasonableness of charges flowed by Entergy Gulf States Louisiana through its fuel adjustment clause for the period 2005 through 2009.  In March 2016 the LPSC staff consultant issued its audit report. In its report, the LPSC staff consultant recommended that Entergy Louisiana refund approximately $8.6 million, plus interest, to customers and realign the recovery of approximately $12.7 million from Entergy Gulf States Louisiana’s fuel adjustment clause to base rates. In September 2016 the LPSC staff filed testimony stating that it was no longer recommending a disallowance of $3.4 million of the $8.6 million discussed above, but otherwise maintained positions from its report. Subsequently, the parties entered into a settlement, which was approved by the LPSC in November 2016. The settlement recognized the dry cask storage recovery method issue, which was addressed in the separate proceeding approved by the LPSC in October 2017, provided for a refund of $5 million, which was made to legacy Entergy Gulf States Louisiana customers in December 2016, and resolved all other issues raised in the audit.
In July 2014 the LPSC authorized its staff to initiate an audit of Entergy Gulf States Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed by Entergy Gulf States Louisiana through its fuel adjustment clause for the period from 2010 through 2013. Discovery commenced in July 2015. No report of audit has been issued.

In July 2014 the LPSC authorized its staff to initiate an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed by Entergy Louisiana through its fuel adjustment clause for the period from 2010 through 2013. Discovery commenced in July 2015. No report of audit has been issued.

In June 2016 the LPSC staff provided notice of audits of Entergy Louisiana’s fuel adjustment clause filings and purchased gas adjustment clause filings. In recognition of the business combination that occurred in 2015, the audit notice was issued to Entergy Louisiana and will also include a review of charges to legacy Entergy Gulf States Louisiana customers prior to the business combination. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s fuel adjustment clause for the period from 2014 through 2015 and charges flowed through Entergy Louisiana’s purchased gas adjustment clause for the period from 2012 through 2015. Discovery commenced in March 2017. No report of audit has been issued.

Due to higher fuel costs for the operating month of January 2018 resulting in part from recent cold weather, higher Henry Hub prices, and an increase in total fuel and purchased power costs, Entergy Louisiana plans to cap the average fuel adjustment charge to be billed in March 2018 at $0.03060 per kWh and to defer billing of all fuel costs in excess of the capped amounts by including such costs in the over- or under-recovery account.

Entergy Mississippi

Entergy Mississippi’s rate schedules include an energy cost recovery rider that is adjusted annually to reflect accumulated over- or under-recoveries.  Entergy Mississippi’s fuel cost recoveries are subject to annual audits conducted pursuant to the authority of the MPSC.

Entergy Mississippi had a deferred fuel over-recovery balance of $58.3 million as of May 31, 2015, along with an under-recovery balance of $12.3 million under the power management rider. Pursuant to those tariffs, in July 2015, Entergy Mississippi filed for interim adjustments under both the energy cost recovery rider and the power management rider to flow through to customers the approximately $46 million net over-recovery over a six-month period. In August 2015, the MPSC approved the interim adjustments effective with September 2015 bills. In November 2015, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included a projected over-recovery balance of $48 million projected through January 31, 2016. In January 2016 the MPSC approved the redetermined annual factor effective February 1, 2016. The MPSC further ordered, however, that due to the significant change in natural gas price forecasts since Entergy Mississippi’s filing in November 2015 Entergy Mississippi should file a revised fuel factor with the MPSC no later than February 1, 2016. Pursuant to that order, Entergy Mississippi submitted a revised fuel factor. Additionally, because Entergy Mississippi’s projected over-recovery balance for the period ending January 31, 2016 was $68 million, in February 2016, Entergy Mississippi filed for another interim adjustment to the energy cost factor effective April 2016 to flow through to customers the projected over-recovery balance over a six-month period. That interim adjustment was approved by the MPSC in February 2016 effective for April 2016 bills.

In November 2016, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an over-recovery of less than $2 million as of September 30, 2016. In January 2017 the MPSC approved the annual factor effective with February 2017 bills. Also in January 2017 the MPSC certified to the Mississippi Legislature the audit reports of its independent auditors for the fuel year ending September 30, 2016. In its order, the MPSC expressly reserved the right to review and determine the recoverability of any and all purchased power expenditures made during fiscal year 2016. The MPSC hired independent auditors to conduct an annual operations audit and a financial audit. The independent auditors issued their audit reports in December 2017. The audit reports included several recommendations for action by Entergy Mississippi but did not recommend any cost disallowances. In January 2018 the MPSC certified the audit reports to the Mississippi Legislature. In November 2017 the Public Utilities Staff separately engaged a consultant to review the outage at the Grand Gulf Nuclear Station that began in 2016. The review is currently in progress.

In November 2017, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an under-recovery of approximately $61.5 million as of September 30, 2017. Entergy Mississippi proposed a two-tiered energy cost factor designed to promote overall rate stability throughout 2018 particularly during the summer months. In January 2018 the MPSC approved the proposed energy cost factors effective for February 2018 bills.

Mississippi Attorney General Complaint

The Mississippi attorney general filed a complaint in state court in December 2008 against Entergy Corporation, Entergy Mississippi, Entergy Services, and Entergy Power alleging, among other things, violations of Mississippi statutes, fraud, and breach of good faith and fair dealing, and requesting an accounting and restitution.  The complaint is wide ranging and relates to tariffs and procedures under which Entergy Mississippi purchases power not generated in Mississippi to meet electricity demand.  Entergy believes the complaint is unfounded.  In December 2008 the defendant Entergy companies removed the Attorney General’s lawsuit to U.S. District Court in Jackson, Mississippi.  The Mississippi attorney general moved to remand the matter to state court.  In August 2012 the District Court issued an opinion denying the Attorney General’s motion for remand, finding that the District Court has subject matter jurisdiction under the Class Action Fairness Act.

The defendant Entergy companies answered the complaint and filed a counterclaim for relief based upon the Mississippi Public Utilities Act and the Federal Power Act.  In May 2009 the defendant Entergy companies filed a motion for judgment on the pleadings asserting grounds of federal preemption, the exclusive jurisdiction of the MPSC, and factual errors in the Attorney General’s complaint.  In September 2012 the District Court heard oral argument on Entergy’s motion for judgment on the pleadings.

In January 2014 the U.S. Supreme Court issued a decision in which it held that cases brought by attorneys general as the sole plaintiff to enforce state laws were not considered “mass actions” under the Class Action Fairness Act, so as to establish federal subject matter jurisdiction. One day later the Attorney General renewed his motion to remand the Entergy case back to state court, citing the U.S. Supreme Court’s decision. The defendant Entergy companies responded to that motion reiterating the additional grounds asserted for federal question jurisdiction, and the District Court held oral argument on the renewed motion to remand in February 2014. In April 2015 the District Court entered an order denying the renewed motion to remand, holding that the District Court has federal question subject matter jurisdiction. The Attorney General appealed to the U.S. Fifth Circuit Court of Appeals the denial of the motion to remand. In July 2015 the Fifth Circuit issued an order denying the appeal, and the Attorney General subsequently filed a petition for rehearing of the request for interlocutory appeal, which was also denied. In December 2015 the District Court ordered that the parties submit to the court undisputed and disputed facts that are material to the Entergy defendants’ motion for judgment on the pleadings, as well as supplemental briefs regarding the same. Those filings were made in January 2016.

In September 2016 the Attorney General filed a mandamus petition with the U.S. Fifth Circuit Court of Appeals in which the Attorney General asked the Fifth Circuit to order the chief judge to reassign this case to another judge. In September 2016 the District Court denied the Entergy companies’ motion for judgment on the pleadings. The Entergy companies filed a motion seeking to amend the District Court’s order denying the Entergy companies’ motion for judgment on the pleadings and allowing an interlocutory appeal. In October 2016 the Fifth Circuit granted the Attorney General’s motion for writ of mandamus and directed the chief judge to assign the case to a new judge. The case was reassigned in October 2016. In January 2017 the District Court denied the Entergy companies’ motion to amend the order denying the motion for judgment on the pleadings. In June 2017 the District Court issued a case management order setting a trial date in November 2018. Discovery is currently in progress.
Entergy New Orleans

Entergy New Orleans’s electric rate schedules include a fuel adjustment tariff designed to reflect no more than targeted fuel and purchased power costs, adjusted by a surcharge or credit for deferred fuel expense arising from the monthly reconciliation of actual fuel and purchased power costs incurred with fuel cost revenues billed to customers, including carrying charges.
 
Entergy New Orleans’s gas rate schedules include a purchased gas adjustment to reflect estimated gas costs for the billing month, adjusted by a surcharge or credit similar to that included in the electric fuel adjustment clause, including carrying charges.

Due to higher fuel costs associated in part with the extended Grand Gulf outage and the partially simultaneous Union Power Block 1 planned outage, for the December 2016, January 2017, and February 2017 billing months, the City Council authorized Entergy New Orleans to cap the fuel adjustment charge billed to customers at $0.035 per kWh and to defer billing of all fuel costs in excess of the capped amount by including such costs in the over- or under-recovery account.

Due to higher fuel costs for the operating month of January 2018 resulting in part from recent cold weather, higher Henry Hub prices, and an increase in total fuel and purchased power costs associated in part with certain plant outages, Entergy New Orleans has proposed to cap the fuel adjustment charge to be billed in March 2018 to non-transmission Entergy New Orleans legacy customers and Entergy New Orleans Algiers customers at $0.035323 per kWh and $0.025446 per kWh, respectively. Entergy New Orleans has also proposed to cap the fuel adjustment charge to be billed in March 2018 for Entergy New Orleans legacy transmission customers at $0.034609 per kWh and to defer billing of all fuel costs in excess of the capped amount by including such costs in the over- or under-recovery account.

Entergy Texas

Entergy Texas’s rate schedules include a fixed fuel factor to recover fuel and purchased power costs, including interest, not recovered in base rates.   Semi-annual revisions of the fixed fuel factor are made in March and September based on the market price of natural gas and changes in fuel mix.  The amounts collected under Entergy Texas’s fixed fuel factor and any interim surcharge or refund are subject to fuel reconciliation proceedings before the PUCT.
        
In August 2014, Entergy Texas filed an application seeking PUCT approval to implement an interim fuel refund of approximately $24.6 million for over-collected fuel costs incurred during the months of November 2012 through April 2014. This refund resulted from (i) applying $48.6 million in bandwidth remedy payments that Entergy Texas received in May 2014 related to the June - December 2005 period to Entergy Texas’s $8.7 million under-recovered fuel balance as of April 30, 2014 and (ii) netting that fuel balance against the $15.3 million bandwidth remedy payment that Entergy Texas made related to calendar year 2013 production costs. Also in August 2014, Entergy Texas filed an unopposed motion for interim rates to implement these refunds for most customers over a two-month period commencing with September 2014. The PUCT issued its order approving the interim relief in August 2014 and Entergy Texas completed the refunds in October 2014. Parties intervened in this matter, and all parties agreed that the proceeding should be bifurcated such that the proposed interim refund would become final in a separate proceeding, which refund was approved by the PUCT in March 2015.   In July 2015 certain parties filed briefs in the open proceeding asserting that Entergy Texas should refund to retail customers an additional $10.9 million in bandwidth remedy payments Entergy Texas received related to calendar year 2006 production costs.  In October 2015 an ALJ issued a proposal for decision recommending that the additional $10.9 million in bandwidth remedy payments be refunded to retail customers. In January 2016 the PUCT issued its order affirming the ALJ’s recommendation, and Entergy Texas filed a motion for rehearing of the PUCT’s decision, which the PUCT denied. In March 2016, Entergy Texas filed a complaint in Federal District Court for the Western District of Texas and a petition in the Travis County (State) District Court appealing the PUCT’s decision. The pending appeals did not stay the PUCT’s decision. In April 2016, Entergy Texas filed with the PUCT an application to refund to customers approximately $56.2 million. The refund resulted from (i) $41.8 million of fuel cost recovery over-collections through February 2016, (ii) the $10.9 million in bandwidth remedy payments, discussed above, that Entergy Texas received related to calendar year 2006 production costs, and (iii) $3.5 million in bandwidth remedy payments that Entergy Texas received related to 2006-2008 production costs. In June 2016, Entergy Texas filed an unopposed settlement agreement that added additional over-recovered fuel costs for the months of March and April 2016. The settlement resulted in a $68 million refund. The ALJ approved the refund on an interim basis to be made to most customers over a four-month period beginning with the first billing cycle of July 2016. In July 2016 the PUCT issued an order approving the interim refund. The federal appeal of the PUCT’s January 2016 decision was heard in December 2016, and the Federal District Court granted Entergy Texas’s requested relief. In January 2017 the PUCT and an intervenor filed petitions for appeal to the U.S. Court of Appeals for the Fifth Circuit of the Federal District Court ruling. Oral argument was held before the U.S. Court of Appeals for the Fifth Circuit in February 2018, and a decision is pending. The State District Court appeal of the PUCT’s January 2016 decision also remains pending.

In July 2016, Entergy Texas filed an application to reconcile its fuel and purchased power costs for the period April 1, 2013 through March 31, 2016. Under a recent PUCT rule change, a fuel reconciliation is required to be filed at least once every three years and outside of a base rate case filing. During the reconciliation period, Entergy Texas incurred approximately $1.77 billion in Texas jurisdictional eligible fuel and purchased power expenses, net of certain revenues credited to such expenses and other adjustments. Entergy Texas estimated an over-recovery balance of approximately $19.3 million, including interest, which Entergy Texas requested authority to carry over as the beginning balance for the subsequent reconciliation period beginning Apri1 2016. Entergy Texas also noted, however, that the estimated $19.3 million over collection was being refunded to customers as a portion of the interim fuel refund beginning with the first billing cycle of July 2016, discussed above. Entergy Texas also requested a prudence finding for each of the fuel-related contracts and arrangements entered into or modified during the reconciliation period that have not been reviewed by the PUCT in a prior proceeding. In December 2016, Entergy Texas entered into a stipulation and settlement agreement resulting in a $6 million disallowance not associated with any particular issue raised and a refund of the over-recovery balance of $21 million as of November 30, 2016, to most customers beginning April 2017 through June 2017. This settlement was developed concurrently with the stipulation and settlement agreement in the 2016 transmission cost recovery factor rider amendment discussed below, and the terms and conditions in both settlements are interdependent. The fuel reconciliation settlement was approved by the PUCT in March 2017 and the refunds were made.

In June 2017, Entergy Texas filed an application for a fuel refund of approximately $30.7 million for the months of December 2016 through April 2017. For most customers, the refunds flowed through bills for the months of July 2017 through September 2017. The fuel refund was approved by the PUCT in August 2017.

In December 2017, Entergy Texas filed an application for a fuel refund of approximately $30.5 million for the months of May 2017 through October 2017. Also in December 2017, the PUCT’s ALJ approved the refund on an interim basis. For most customers, the refunds flowed through bills beginning January 2018 and will continue through March 2018. A final decision in this matter remains pending.
    
Retail Rate Proceedings

Filings with the APSC (Entergy Arkansas)

Retail Rates

2015 Base Rate Filing
 
In April 2015, Entergy Arkansas filed with the APSC for a general change in rates, charges, and tariffs. The filing notified the APSC of Entergy Arkansas’s intent to implement a forward test year formula rate plan pursuant to Arkansas legislation passed in 2015, and requested a retail rate increase of $268.4 million, with a net increase in revenue of $167 million. The filing requested a 10.2% return on common equity. In September 2015 the APSC staff and intervenors filed direct testimony, with the APSC staff recommending a revenue requirement of $217.9 million and a 9.65% return on common equity. In December 2015, Entergy Arkansas, the APSC staff, and certain of the intervenors in the rate case filed with the APSC a joint motion for approval of a settlement of the case that proposed a retail rate increase of approximately $225 million with a net increase in revenue of approximately $133 million; an authorized return on common equity of 9.75%; and a formula rate plan tariff that provides a +/- 50 basis point band around the 9.75% allowed return on common equity. A significant portion of the rate increase is related to Entergy Arkansas’s acquisition in March 2016 of Union Power Station Power Block 2 for a base purchase price of $237 million. The settlement agreement also provided for amortization over a 10-year period of $7.7 million of previously-incurred costs related to ANO post-Fukushima compliance and $9.9 million of previously-incurred costs related to ANO flood barrier compliance. A settlement hearing was held in January 2016. In February 2016 the APSC approved the settlement with one exception that reduced the retail rate increase proposed in the settlement by $5 million. The settling parties agreed to the APSC modifications in February 2016. The new rates were effective February 24, 2016 and began billing with the first billing cycle of April 2016. In March 2016, Entergy Arkansas made a compliance filing regarding the new rates that included an interim base rate adjustment surcharge, effective with the first billing cycle of April 2016, to recover the incremental revenue requirement for the period February 24, 2016 through March 31, 2016. The interim base rate adjustment surcharge was designed to recover a total of $21.1 million over the nine-month period from April 2016 through December 2016.

2016 Formula Rate Plan Filing
    
In July 2016, Entergy Arkansas filed with the APSC its 2016 formula rate plan filing showing Entergy Arkansas’s projected earned return on common equity for the twelve months ended December 31, 2017 test period to be below the formula rate plan bandwidth. The filing requested a $67.7 million revenue requirement increase to achieve Entergy Arkansas’s target earned return on common equity of 9.75%. In October 2016, Entergy Arkansas filed with the APSC revised formula rate plan attachments with an updated request for a $54.4 million revenue requirement increase based on acceptance of certain adjustments and recommendations made by the APSC staff and other intervenors, as well as three additional adjustments identified as appropriate by Entergy Arkansas. In November 2016 a hearing was held and the APSC issued an order directing the parties to brief certain issues. In December 2016 the APSC approved the settlement agreement and the $54.4 million revenue requirement increase with approximately $25 million of the $54.4 million revenue requirement subject to possible future adjustment and refund to customers with interest. The APSC requested supplemental information for some of Entergy Arkansas’s requested nuclear expenditures. In December 2016 the APSC approved Entergy Arkansas’s formula rate plan compliance tariff, and the rates became effective with the first billing cycle of January 2017. In April 2017, Entergy Arkansas filed a motion consented to by all parties requesting that it be permitted to submit the supplemental information requested by the APSC in conjunction with its 2017 formula rate plan filing, which was subsequently made in July 2017 and is discussed below. In May 2017 the APSC approved the joint motion and proposal to review Entergy Arkansas’s supplemental information on a concurrent schedule with the 2017 formula rate plan filing. In October 2017, Entergy Arkansas and the parties to the proceeding filed a joint motion to approve a unanimous settlement agreement resolving all issues in the docket and providing for recovery of the 2017 and 2018 nuclear costs. In December 2017 the APSC approved the settlement agreement and recovery of the 2017 and 2018 nuclear costs.

2017 Formula Rate Plan Filing

In July 2017, Entergy Arkansas filed with the APSC its 2017 formula rate plan filing showing Entergy Arkansas’s projected earned return on common equity for the twelve months ended December 31, 2018 test period to be below the formula rate plan bandwidth.  The filing projected a $129.7 million revenue requirement increase to achieve Entergy Arkansas’s target earned return on common equity of 9.75%.  Entergy Arkansas’s formula rate plan is subject to a four percent annual revenue constraint and the projected annual revenue requirement increase exceeded the four percent, resulting in a proposed increase for the 2017 formula rate plan of $70.9 million. In October 2017, Entergy Arkansas filed with the APSC revised formula rate plan attachments that projected a $126.2 million revenue requirement increase based on acceptance of certain adjustments and recommendations made by the APSC staff and other intervenors. The revised formula rate plan filing included a proposed $71.1 million revenue requirement increase based on a revision to the four percent constraint calculation. In October 2017, Entergy Arkansas and the parties to the proceeding filed a joint motion to approve a unanimous settlement agreement resolving all issues in the docket and providing for recovery of the 2017 and 2018 nuclear costs. In December 2017 the APSC approved the settlement agreement and the $71.1 million revenue requirement increase, as well as Entergy Arkansas’s formula rate plan compliance tariff, and the rates became effective with the first billing cycle of January 2018.
 
Internal Restructuring

In November 2017, Entergy Arkansas filed an application with the APSC seeking authorization to undertake a restructuring that would result in the transfer of substantially all of the assets and operations of Entergy Arkansas to a new entity, which would ultimately be owned by an existing Entergy subsidiary holding company. The restructuring is subject to regulatory review and approval by the APSC, the FERC, and the NRC. Entergy Arkansas also filed a notice with the Missouri Public Service Commission in December 2017 out of an abundance of caution, although Entergy Arkansas does not serve any retail customers in Missouri. If the APSC approves the restructuring by September 1, 2018, and the restructuring closes on or before December 1, 2018, Entergy Arkansas proposed in its application to credit retail customers $66 million over six years, beginning in 2019. In February 2018, Entergy Arkansas filed supplemental testimony reducing the proposed retail customer credits to $39.6 million over six years. If the APSC, the FERC, and the NRC approvals are obtained, Entergy Arkansas expects the restructuring will be consummated on or before December 1, 2018.
It is currently contemplated that Entergy Arkansas would undertake a multi-step restructuring, which would include the following:
Entergy Arkansas would redeem its outstanding preferred stock at the aggregate redemption price of approximately $32.7 million, which includes call premiums, plus accumulated and unpaid dividends, if any.
Entergy Arkansas would convert from an Arkansas corporation to a Texas corporation.
Under the Texas Business Organizations Code (TXBOC), Entergy Arkansas will allocate substantially all of its assets to a new subsidiary, Entergy Arkansas Power, LLC, a Texas limited liability company (Entergy Arkansas Power), and Entergy Arkansas Power will assume substantially all of the liabilities of Entergy Arkansas, in a transaction regarded as a merger under the TXBOC. Entergy Arkansas will remain in existence and hold the membership interests in Entergy Arkansas Power.
Entergy Arkansas will contribute the membership interests in Entergy Arkansas Power to an affiliate (Entergy Utility Holding Company, LLC, a Texas limited liability company and subsidiary of Entergy Corporation). As a result of the contribution, Entergy Arkansas Power will be a wholly-owned subsidiary of Entergy Utility Holding Company, LLC.
Entergy Arkansas will change its name to Entergy Utility Property, Inc., and Entergy Arkansas Power will then change its name to Entergy Arkansas, LLC.

Upon the completion of the restructuring, Entergy Arkansas, LLC will hold substantially all of the assets, and will have assumed substantially all of the liabilities, of Entergy Arkansas. Entergy Arkansas may modify or supplement the steps to be taken to effectuate the restructuring.
Filings with the LPSC (Entergy Louisiana)

Retail Rates - Electric

2014 Formula Rate Plan Filing

In connection with the approval of the business combination of Entergy Gulf States Louisiana and Entergy Louisiana, the LPSC authorized the filing of a single, joint, formula rate plan evaluation report for Entergy Gulf States Louisiana’s and Entergy Louisiana’s 2014 calendar year operations. The joint evaluation report was filed in September 2015 and reflected an earned return on common equity of 9.09%. As such, no adjustment to base formula rate plan revenue was required. The following adjustments were required under the formula rate plan, however: a decrease in the additional capacity mechanism for Entergy Louisiana of $17.8 million; an increase in the additional capacity mechanism for Entergy Gulf States Louisiana of $4.3 million; and a reduction of $5.5 million to the MISO cost recovery mechanism to collect approximately $35.7 million on a combined-company basis. Under the order approving the business combination, following completion of the prescribed review period, rates were implemented with the first billing cycle of December 2015, subject to refund. See “Entergy Louisiana and Entergy Gulf States Louisiana Business Combination” below for further discussion of the business combination. In June 2017 the LPSC staff and Entergy Louisiana filed an unopposed joint report of proceedings, which was accepted by the LPSC in June 2017, finalizing the results of this proceeding with no changes to rates already implemented.

2015 Formula Rate Plan Filing

In May 2016, Entergy Louisiana filed its formula rate plan evaluation report for its 2015 calendar year operations. The evaluation report reflected an earned return on common equity of 9.07%. As such, no adjustment to base formula rate plan revenue was required. The following other adjustments, however, were required under the formula rate plan: an increase in the legacy Entergy Louisiana additional capacity mechanism of $14.2 million; a separate increase in legacy Entergy Louisiana revenue of $10 million primarily to reflect the effects of the termination of the System Agreement; an increase in the legacy Entergy Gulf States Louisiana additional capacity mechanism of $0.5 million; a decrease in legacy Entergy Gulf States Louisiana revenue of $58.7 million primarily to reflect the effects of the termination of the System Agreement; and an increase of $11 million to the MISO cost recovery mechanism. Rates were implemented with the first billing cycle of September 2016, subject to refund. Following implementation of the as-filed rates in September 2016, there were several interim updates to Entergy Louisiana’s formula rate plan, including the one submitted in December 2016, reflecting implementation of the settlement of the Waterford 3 replacement steam generator project prudence review described below. In June 2017 the LPSC staff and Entergy Louisiana filed a joint report of proceedings, which was accepted by the LPSC in June 2017, finalizing the results of the May 2016 evaluation report, interim updates, and corresponding proceedings with no changes to rates already implemented.

Extension of MISO Cost Recovery Mechanism Rider

In November 2016, Entergy Louisiana filed with the LPSC a request to extend the MISO cost recovery mechanism rider provision of its formula rate plan. In March 2017 the LPSC staff submitted direct testimony generally supportive of a one-year extension of the MISO cost recovery mechanism and the intervenor in the proceeding did not oppose an extension for this period of time. In July 2017 an uncontested joint stipulation authorizing a one-year extension of the MISO cost recovery mechanism rider was approved.

2016 Formula Rate Plan Filing

In May 2017, Entergy Louisiana filed its formula rate plan evaluation report for its 2016 calendar year operations. The evaluation report reflected an earned return on common equity of 9.84%. As such, no adjustment to base formula rate plan revenue was required. Adjustments, however, were required under the formula rate plan; the 2016 formula rate plan evaluation report showed a decrease in formula rate plan revenue of approximately $16.9 million, comprised of a decrease in legacy Entergy Louisiana formula rate plan revenue of $3.5 million, a decrease in legacy Entergy Gulf States Louisiana formula rate plan revenue of $9.7 million, and a decrease in incremental formula rate plan revenue of $3.7 million. Additionally, the formula rate plan evaluation report called for a decrease of $40.5 million in the MISO cost recovery revenue requirement from the present level of $46.8 million to $6.3 million. Rates reflecting these adjustments were implemented with the first billing cycle of September 2017, subject to refund. In September 2017 the LPSC issued its report indicating that no changes to Entergy Louisiana’s original formula rate plan evaluation report were required but reserved for several issues, including Entergy Louisiana’s September 2017 update to its formula rate plan evaluation report.

Formula Rate Plan Extension Request

In August 2017, Entergy Louisiana filed a request with the LPSC seeking to extend its formula rate plan for three years (2017-2019) with limited modifications to its terms.  Those modifications include: a one-time resetting of base rates to the midpoint of the band at Entergy Louisiana’s authorized return on equity of 9.95% for the 2017 test year; narrowing of the formula rate plan bandwidth from a total of 160 basis points to 80 basis points; and a forward-looking mechanism that would allow Entergy Louisiana to recover certain transmission-related costs contemporaneously with when those projects begin delivering benefits to customers.  Entergy Louisiana requested that the LPSC consider its request on an expedited basis, in an effort to maintain Entergy Louisiana’s current cycle for implementing rate adjustments, i.e., September 2018, without the need for filing a full base rate case proceeding. Several parties have intervened in the proceeding and all parties have been participating in settlement discussions.

Waterford 3 Replacement Steam Generator Project

Following the completion of the Waterford 3 replacement steam generator project, the LPSC undertook a prudence review in connection with a filing made by Entergy Louisiana in April 2013 with regard to the following aspects of the replacement project: 1) project management; 2) cost controls; 3) success in achieving stated objectives; 4) the costs of the replacement project; and 5) the outage length and replacement power costs. In July 2014 the LPSC staff filed testimony recommending potential project and replacement power cost disallowances of up to $71 million, citing a need for further explanation or documentation from Entergy Louisiana.  An intervenor filed testimony recommending disallowance of $141 million of incremental project costs, claiming the steam generator fabricator was imprudent.  Entergy Louisiana provided further documentation and explanation requested by the LPSC staff. An evidentiary hearing was held in December 2014. At the hearing the parties maintained the positions reflected in pre-filed testimony. Entergy Louisiana believed that the replacement steam generator costs were prudently incurred and applicable legal principles supported their recovery in rates.  Nevertheless, Entergy Louisiana recorded a write-off of $16 million of Waterford 3’s plant balance in December 2014 because of the uncertainty at the time associated with the resolution of the prudence review. In December 2015 the ALJ issued a proposed recommendation, which was subsequently finalized, concluding that Entergy Louisiana prudently managed the Waterford 3 replacement steam generator project, including the selection, use, and oversight of contractors, and could not reasonably have anticipated the damage to the steam generators. Nevertheless, the ALJ concluded that Entergy Louisiana was liable for the conduct of its contractor and subcontractor and, therefore, recommended a disallowance of $67 million in capital costs. Additionally, the ALJ concluded that Entergy Louisiana did not sufficiently justify the incurrence of $2 million in replacement power costs during the replacement outage. Although the ALJ’s recommendation had not yet been considered by the LPSC, after considering the progress of the proceeding in light of the ALJ recommendation, Entergy Louisiana recorded in the fourth quarter 2015 approximately $77 million in charges, including a $45 million asset write-off and a $32 million regulatory charge, to reflect that a portion of the assets associated with the Waterford 3 replacement steam generator project was no longer probable of recovery. Entergy Louisiana maintained that the ALJ’s recommendation contained significant factual and legal errors.

In October 2016 the parties reached a settlement in this matter. The settlement was approved by the LPSC in December 2016. The settlement effectively provided for an agreed-upon disallowance of $67 million of plant, which had been previously written off by Entergy Louisiana, as discussed above. The refund to customers of approximately $71 million as a result of the settlement approved by the LPSC was made to customers in January 2017. Of the $71 million of refunds, $68 million was credited to customers through Entergy Louisiana’s formula rate plan, outside of sharing, and $3 million through its fuel adjustment clause. Entergy Louisiana had previously recorded a provision of $48 million for this refund. The previously-recorded provision included the cumulative revenues recorded through December 2016 related to the $67 million of disallowed plant. An additional regulatory charge of $23 million was recorded in fourth quarter 2016 to reflect the effects of the settlement. The settlement also provided that Entergy Louisiana could retain the value associated with potential service credits agreed to by the project contractor, to the extent they are realized in the future. Following a review by the parties, an unopposed joint report of proceedings was filed by the LPSC staff and Entergy Louisiana in May 2017 and the LPSC accepted the joint report of proceedings resolving the matter.

Ninemile 6

In July 2014, Entergy Gulf States Louisiana and Entergy Louisiana filed an unopposed stipulation with the LPSC, which was subsequently approved, that estimated a first year revenue requirement associated with Ninemile 6 and provided a mechanism to update the revenue requirement as the in-service date approached. In late-December 2014, roughly contemporaneous with the unit's placement in service, a final updated estimated revenue requirement of $26.8 million for Entergy Gulf States Louisiana and $51.1 million for Entergy Louisiana was filed. The December 2014 estimate formed the basis of rates implemented effective with the first billing cycle of January 2015. In July 2015, Entergy Louisiana submitted to the LPSC a compliance filing including an estimate at completion, inclusive of interconnection costs and transmission upgrades, of approximately $648 million, or $76 million less than originally estimated, along with other project details and supporting evidence, to enable the LPSC to review the prudence of Entergy Louisiana’s management of the project. Testimony filed by the LPSC staff generally supported the prudence of the management of the project and recovery of the costs incurred to complete the project. The LPSC staff had questioned the warranty coverage for one element of the project. In October 2016 all parties agreed to a stipulation providing that 100% of Ninemile 6 construction costs was prudently incurred and is eligible for recovery from customers, but reserving the LPSC’s rights to review the prudence of Entergy Louisiana’s actions regarding one element of the project. This stipulation was approved by the LPSC in January 2017.

Union Power Station and Deactivation or Retirement Decisions for Entergy Louisiana Plants

In January 2015, Entergy Gulf States Louisiana filed its application with the LPSC for approval of the acquisition and cost recovery of two power blocks of the Union Power Station for an expected base purchase price of approximately $237 million per power block, subject to adjustments. In September 2015, Entergy Gulf States Louisiana agreed to settlement terms with all parties for Entergy Gulf States Louisiana’s purchase of the two power blocks. In October 2015 the LPSC voted unanimously to approve the uncontested settlement which finds, among other things, that acquisition of Power Blocks 3 and 4 is in the public interest and, therefore, prudent. The business combination of Entergy Gulf States Louisiana and Entergy Louisiana received regulatory approval and closed in October 2015 making Entergy Louisiana the named purchaser of Power Blocks 3 and 4 of the Union Power Station. In March 2016, Entergy Louisiana acquired Power Blocks 3 and 4 of Union Power Station for an aggregate purchase price of approximately $474 million and implemented rates to collect the estimated first-year revenue requirement with the first billing cycle of March 2016.

As a term of the LPSC-approved settlement authorizing the purchase of Power Blocks 3 and 4 of the Union Power Station, Entergy Louisiana agreed to make a filing with the LPSC to review its decisions to deactivate Ninemile 3 and Willow Glen 2 and 4 and its decision to retire Little Gypsy 1.  In January 2016, Entergy Louisiana made its compliance filing with the LPSC. Entergy Louisiana, LPSC staff, and intervenors participated in a technical conference in March 2016 where Entergy Louisiana presented information on its deactivation/retirement decisions for these four units in addition to information on the current deactivation decisions for the ten-year planning horizon. Parties have requested further proceedings on the prudence of the decision to deactivate Willow Glen 2 and 4.  No party contests the prudence of the decision to deactivate Willow Glen 2 and 4 or suggests reactivation of these units; however, issues have been raised related to Entergy Louisiana’s decision to give up its transmission service rights in MISO for Willow Glen 2 and 4 rather than placing the units into suspended status for the three-year term permitted by MISO. An evidentiary hearing was held in August 2017 and post-hearing briefs were submitted in October 2017. A decision is expected in 2018.

Retail Rates - Gas 

In accordance with the settlement of Entergy Gulf States Louisiana’s gas rate stabilization plan for the test year ended September 30, 2012, in August 2014, Entergy Gulf States Louisiana submitted for consideration a proposal for implementation of an infrastructure rider to recover expenditures associated with strategic plant investment and relocation projects mandated by local governments. After review by the LPSC staff and inclusion of certain customer safeguards required by the LPSC staff, in December 2014, Entergy Gulf States Louisiana and the LPSC staff submitted a joint settlement for implementation of an accelerated gas pipe replacement program providing for the replacement of approximately 100 miles of pipe over the next ten years, as well as relocation of certain existing pipe resulting from local government-related infrastructure projects, and for a rider to recover the investment associated with these projects. The rider allows for recovery of approximately $65 million over ten years. The rider recovery will be adjusted on a quarterly basis to include actual investment incurred for the prior quarter and is subject to the following conditions, among others: a ten-year term; application of any earnings in excess of 10.45% as an offset to the revenue requirement of the infrastructure rider; adherence to a specified spending plan, within plus or minus 20% annually; annual filings comparing actual versus planned rider spending with actual spending and explanation of variances exceeding 10%; and an annual true-up. The joint settlement was approved by the LPSC in January 2015. Implementation of the infrastructure rider commenced with bills rendered on and after the first billing cycle of April 2015.

2014 Rate Stabilization Plan Filing

In January 2015, Entergy Gulf States Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2014.  The filing showed an earned return on common equity of 7.20%, which resulted in a $706 thousand rate increase.  In April 2015 the LPSC issued findings recommending two adjustments to Entergy Gulf States Louisiana’s as-filed results, and an additional recommendation that did not affect the results. The LPSC staff’s recommended adjustments increase the earned return on equity for the test year to 7.24%. Entergy Gulf States Louisiana accepted the LPSC staff’s recommendations and a revenue increase of $688 thousand was implemented with the first billing cycle of May 2015.

2015 Rate Stabilization Plan Filing

In January 2016, Entergy Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2015. The filing showed an earned return on common equity of 10.22%, which is within the authorized bandwidth, therefore requiring no change in rates. In March 2016 the LPSC staff issued its report stating that the 2015 gas rate stabilization plan filing was in compliance with the exception of several issues that required additional information, explanation, or clarification for which the LPSC staff had reserved the right to further review. In July 2016 the parties to the proceeding filed an unopposed joint report and motion for entry of order accepting the report that indicated no outstanding issues remained in the filing.

In February 2016, Entergy Louisiana filed a motion requesting to extend the term of the gas rate stabilization plan in substantially similar form for an additional three-year term and included a request for sharing of non-jurisdictional compressed natural gas revenues. Following discovery and the filing of testimony by the LPSC staff, Entergy Louisiana and the LPSC submitted a joint motion for hearing an uncontested stipulated settlement resolving the proceeding. A hearing on the stipulation was held in November 2016. The ALJ issued a report of proceedings that was presented with the parties’ stipulation to the LPSC for consideration. The stipulation approving Entergy Louisiana’s requested extension of the rate stabilization plan was approved by the LPSC in December 2016.

2016 Rate Stabilization Plan Filing

In January 2017, Entergy Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2016. The filing of the evaluation report for test year 2016 reflected an earned return on common equity of 6.37%. As part of the original filing, pursuant to the extraordinary cost provision of the rate stabilization plan, Entergy Louisiana sought to recover approximately $1.5 million in deferred operation and maintenance expenses incurred to restore service and repair damage resulting from flooding and widespread rainfall in southeast Louisiana that occurred in August 2016. Entergy Louisiana requested to recover the prudently incurred August 2016 storm restoration costs over ten years, outside of the rate stabilization plan sharing provisions. As a result, Entergy Louisiana’s filing sought an annual increase in revenue of $1.4 million. Following review of the filing, except for the proposed extraordinary cost recovery, the LPSC staff confirmed Entergy Louisiana’s filing was consistent with the principles and requirements of the rate stabilization plan. The extraordinary cost recovery request associated with the 2016 flood-related deferred operation and maintenance expenses incurred for gas operations was removed from the rate stabilization plan pending LPSC consideration in a separate docket. In April 2017 the LPSC approved a joint report of proceedings and Entergy Louisiana submitted a revised evaluation report reflecting a $1.2 million annual increase in revenue with rates implemented with the first billing cycle of May 2017.

In connection with the joint report of proceedings accepted by the LPSC, in May 2017, Entergy Louisiana filed an application to initiate a separate proceeding to recover through the extraordinary cost provision of the gas rate stabilization plan the deferred operation and maintenance expenses of $1.4 million incurred to restore service and repair damage resulting from flooding and widespread rainfall in southeast Louisiana that occurred in August 2016. The LPSC staff submitted its direct testimony in the proceeding recommending recovery of $0.9 million. Entergy Louisiana filed rebuttal testimony responding to the LPSC staff’s recommendation. The procedural schedule was suspended to allow the parties to engage in settlement negotiations, and in February 2018 the LPSC staff and Entergy Louisiana filed an unopposed settlement. If approved by the LPSC, the settlement would provide for Entergy Louisiana to recover, over ten years, the approximately $1.4 million in deferred operation and maintenance expense and related carrying charges. The settlement further provides for recovery to commence in May 2018.

2017 Rate Stabilization Plan Filing

In January 2018, Entergy Louisiana filed with the LPSC its gas rate stabilization plan for test year ended September 30, 2017.  The filing of the evaluation report for the test year 2017 reflected an earned return on common equity of 9.06%.  This earned return is below the earnings sharing band of the rate stabilization plan and results in a rate increase of $0.1 million.  Due to the enactment in late-December 2017 of the Tax Cuts and Jobs Act, Entergy Louisiana did not have adequate time to reflect the effects of this tax legislation in the rate stabilization plan.  As a result, Entergy Louisiana will file a supplement to the January 2018 evaluation report to reflect, among other things, a 21% federal corporate income tax rate.  Any rate change resulting from the revised rate stabilization plan will become effective in rates in May 2018.

Filings with the MPSC (Entergy Mississippi)

Formula Rate Plan Filings

In March 2016, Entergy Mississippi submitted its formula rate plan 2016 test year filing showing Entergy Mississippi’s projected earned return for the 2016 calendar year to be below the formula rate plan bandwidth. The filing showed a $32.6 million rate increase was necessary to reset Entergy Mississippi’s earned return on common equity to the specified point of adjustment of 9.96%, within the formula rate plan bandwidth. In June 2016 the MPSC approved Entergy Mississippi’s joint stipulation with the Mississippi Public Utilities Staff. The joint stipulation provided for a total revenue increase of $23.7 million. The revenue increase includes a $19.4 million increase through the formula rate plan, resulting in a return on common equity point of adjustment of 10.07%. The revenue increase also includes $4.3 million in incremental ad valorem tax expenses to be collected through an updated ad valorem tax adjustment rider. The revenue increase and ad valorem tax adjustment rider were effective with the July 2016 bills.

In March 2017, Entergy Mississippi submitted its formula rate plan 2017 test year filing and 2016 look-back filing showing Entergy Mississippi’s earned return for the historical 2016 calendar year and projected earned return for the 2017 calendar year to be within the formula rate plan bandwidth, resulting in no change in rates. In June 2017, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a stipulation that confirmed that Entergy Mississippi’s earned returns for both the 2016 look-back filing and 2017 test year were within the respective formula rate plan bandwidths. In June 2017 the MPSC approved the stipulation, which resulted in no change in rates.

Filings with the City Council (Entergy New Orleans)

Retail Rates

See “Algiers Asset Transfer” below for discussion of the Algiers asset transfer. As a provision of the settlement agreement approved by the City Council in May 2015 providing for the Algiers asset transfer, it was agreed that, with limited exceptions, no action may be taken with respect to Entergy New Orleans’s base rates until rates are implemented from a base rate case that must be filed for its electric and gas operations in 2018. This provision eliminated the formula rate plan applicable to Algiers operations. The limited exceptions included continued implementation of the then-remaining two years of the four-year phased-in rate increase for the Algiers area and certain exceptional cost increases or decreases in the base revenue requirement. An additional provision of the settlement agreement allowed for continued recovery of the revenue requirement associated with the capacity and energy from Ninemile 6 received by Entergy New Orleans under a power purchase agreement with Entergy Louisiana (Algiers PPA). The settlement authorized Entergy New Orleans to recover the remaining revenue requirement related to the Algiers PPA through base rates charged to Algiers customers. The settlement also provided for continued implementation of the Algiers MISO recovery rider.

In addition to the Algiers PPA, Entergy New Orleans has a separate power purchase agreement with Entergy Louisiana for 20% of the capacity and energy from Ninemile 6 (Ninemile PPA), which commenced operation in December 2014. Initially, recovery of the non-fuel costs associated with the Ninemile PPA was authorized through a special Ninemile 6 rider billed only to Entergy New Orleans customers outside of Algiers.

In August 2015, Entergy New Orleans filed an application with the City Council seeking authorization to proceed with the purchase of Union Power Block 1, with an expected base purchase price of approximately $237 million, subject to adjustments, and seeking approval of the recovery of the associated costs. In November 2015 the City Council issued written resolutions and an order approving an agreement in principle between Entergy New Orleans and City Council advisors providing that the purchase of Union Power Block 1 and related assets by Entergy New Orleans is prudent and in the public interest. The City Council authorized expansion of the terms of the purchased power and capacity acquisition cost recovery rider to recover the non-fuel purchased power expense from Ninemile 6, the revenue requirement associated with the purchase of Power Block 1 of the Union Power Station, and a credit to customers of $400 thousand monthly beginning June 2016 in recognition of the decrease in other operation and maintenance expenses that would result with the deactivation of Michoud Units 2 and 3. In March 2016, Entergy New Orleans purchased Power Block 1 of the Union Power Station for approximately $237 million and initiated recovery of these costs with March 2016 bills. In July 2016, Entergy New Orleans and the City Council Utility Committee agreed to a temporary increase in the Michoud credit to customers to a total of $1.4 million monthly for August 2016 through December 2016.

A 2008 rate case settlement included $3.1 million per year in electric rates to fund the Energy Smart energy efficiency programs.  The rate settlement provided an incentive for Entergy New Orleans to meet or exceed energy savings targets set by the City Council and provided a mechanism for Entergy New Orleans to recover lost contribution to fixed costs associated with the energy savings generated from the energy efficiency programs. In January 2015 the City Council approved funding for the Energy Smart program from April 2015 through March 2017 using the remainder of the approximately $12.8 million of 2014 rough production cost equalization funds, with any remaining costs being recovered through the fuel adjustment clause. This funding methodology was modified in November 2015 when the City Council directed Entergy New Orleans to use a combination of guaranteed customer savings related to a prior agreement with the City Council and rough production cost equalization funds to cover program costs prior to recovering any costs through the fuel adjustment clause. In April 2017 the City Council approved an implementation plan for the Energy Smart program from April 2017 through December 2019. The City Council directed that the $11.8 million balance reported for Energy Smart funds be used to continue funding the program for Entergy New Orleans’s legacy customers and that the Energy Smart Algiers program continue to be funded through the Algiers fuel adjustment clause, until additional customer funding is required for the legacy customers. In September 2017, Entergy New Orleans filed a supplemental plan and proposed several options for an interim cost recovery mechanism necessary to recover program costs during the period between when existing funds directed to Energy Smart programs are depleted (estimated to be June 2018) and when new rates from the anticipated 2018 combined rate case, which will include a cost recovery mechanism for Energy Smart funding, take effect (estimated to be August 2019). Entergy New Orleans requested that the City Council approve a cost recovery mechanism prior to June 2018. In December 2017 the City Council approved an energy efficiency cost recovery rider as an interim funding mechanism for Energy Smart, subject to verification that no additional funding sources exist.

Internal Restructuring

In July 2016, Entergy New Orleans filed an application with the City Council seeking authorization to undertake a restructuring that would result in the transfer of substantially all of the assets and operations of Entergy New Orleans, Inc. to a new entity, which would ultimately be owned by an existing Entergy subsidiary holding company. The restructuring was subject to regulatory review and approval by the City Council and the FERC. In May 2017 the City Council adopted a resolution approving the proposed internal restructuring pursuant to an agreement in principle with the City Council advisors and certain intervenors. Pursuant to the agreement in principle, Entergy New Orleans would credit retail customers $10 million in 2017, $1.4 million in the first quarter of the year after the transaction closes, and $117,500 each month in the second year after the transaction closes until such time as new base rates go into effect as a result of the anticipated 2018 base rate case. Entergy New Orleans began crediting retail customers in June 2017. In June 2017 the FERC approved the transaction and, pursuant to the agreement in principle, Entergy New Orleans will provide additional credits to retail customers of $5 million in each of the years 2018, 2019, and 2020.

In November 2017, pursuant to the agreement in principle, Entergy New Orleans undertook a multi-step restructuring, including the following:

Entergy New Orleans, Inc. redeemed its outstanding preferred stock at a price of approximately $21 million, which included a call premium of approximately $819,000, plus any accumulated and unpaid dividends.
Entergy New Orleans, Inc. converted from a Louisiana corporation to a Texas corporation.
Under the Texas Business Organizations Code (TXBOC), Entergy New Orleans, Inc. allocated substantially all of its assets to a new subsidiary, Entergy New Orleans Power, LLC, a Texas limited liability company (Entergy New Orleans Power), and Entergy New Orleans Power assumed substantially all of the liabilities of Entergy New Orleans, Inc., in a transaction regarded as a merger under the TXBOC. Entergy New Orleans, Inc. remained in existence and held the membership interests in Entergy New Orleans Power.
Entergy New Orleans, Inc. contributed the membership interests in Entergy New Orleans Power to an affiliate (Entergy Utility Holding Company, LLC, a Texas limited liability company and subsidiary of Entergy Corporation). As a result of the contribution, Entergy New Orleans Power is a wholly-owned subsidiary of Entergy Utility Holding Company, LLC.

In December 2017, Entergy New Orleans, Inc. changed its name to Entergy Utility Group, Inc., and Entergy New Orleans Power then changed its name to Entergy New Orleans, LLC. Entergy New Orleans, LLC holds substantially all of the assets, and has assumed substantially all of the liabilities, of Entergy New Orleans, Inc. The restructuring was accounted for as a transaction between entities under common control.

Filings with the PUCT and Texas Cities (Entergy Texas)

Retail Rates

2011 Rate Case

In November 2011, Entergy Texas filed a rate case requesting a $112 million base rate increase reflecting a 10.6% return on common equity based on an adjusted June 2011 test year.  The rate case also proposed a purchased power recovery rider.  On January 12, 2012, the PUCT voted not to address the purchased power recovery rider in the rate case, but the PUCT voted to set a baseline in the rate case proceeding that would be applicable if a purchased power capacity rider is approved in a separate proceeding.  In April 2012 the PUCT Staff filed direct testimony recommending a base rate increase of $66 million and a 9.6% return on common equity.  The PUCT Staff, however, subsequently filed a statement of position in the proceeding indicating that it was still evaluating the position it would ultimately take in the case regarding Entergy Texas’s recovery of purchased power capacity costs and Entergy Texas’s proposal to defer its MISO transition expenses.  In April 2012, Entergy Texas filed rebuttal testimony indicating a revised request for a $105 million base rate increase.  A hearing was held in late-April through early-May 2012.

In September 2012 the PUCT issued an order approving a $28 million rate increase, effective July 2012.  The order included a finding that “a return on common equity (ROE) of 9.80 percent will allow [Entergy Texas] a reasonable opportunity to earn a reasonable return on invested capital.”  The order also provided for increases in depreciation rates and the annual storm reserve accrual.  The order also reduced Entergy Texas’s proposed purchased power capacity costs, stating that they are not known and measurable; reduced Entergy Texas’s regulatory assets associated with Hurricane Rita; excluded from rate recovery capitalized financially-based incentive compensation; included $1.6 million of MISO transition expense in base rates; and reduced Entergy’s Texas’s fuel reconciliation recovery by $4 million because the PUCT disagreed with the line-loss factor used in the calculation.  After considering the progress of the proceeding in light of the PUCT order, Entergy Texas recorded in the third quarter 2012 an approximate $24 million charge to recognize that assets associated with Hurricane Rita, financially-based incentive compensation, and fuel recovery are no longer probable of recovery.  Entergy Texas believed that it was entitled to recover these prudently incurred costs, however, and it filed a motion for rehearing regarding these and several other issues in the PUCT’s order on October 4, 2012.  Several other parties also filed motions for rehearing of the PUCT’s order.  The PUCT subsequently denied rehearing of substantive issues.  Several parties, including Entergy Texas, appealed various aspects of the PUCT’s order to the Travis County District Court. A hearing was held in July 2014. In October 2014 the Travis County District Court issued an order upholding the PUCT’s decision except as to the line-loss factor issue referenced above, which was found in favor of Entergy Texas. In November 2014, Entergy Texas and other parties, including the PUCT, appealed the Travis County District Court decision to the Third Court of Appeals. Oral argument before the court panel was held in September 2015. In April 2016 the Third Court of Appeals issued its opinion affirming the District Court’s decision on all points. Entergy Texas petitioned the Texas Supreme Court to hear its appeal of the Third Court’s ruling. In September 2017 the Texas Supreme Court denied the petitions for review. Entergy Texas filed a motion for rehearing of the Texas Supreme Court’s denial of the petition for review. In January 2018 the Texas Supreme Court denied Entergy Texas’s motion for rehearing.

Distribution cost recovery factor (DCRF) rider

In September 2015, Entergy Texas filed to amend its DCRF rider. Entergy Texas requested an increase in recovery under the rider of $6.5 million, for a total collection of $10.1 million annually from retail customers. In October 2015 intervenors and PUCT staff filed testimony opposing, in part, Entergy Texas’s request. In November 2015, Entergy Texas and the parties filed an unopposed settlement agreement and supporting documents. The settlement established an annual revenue requirement of $8.65 million for the amended DCRF rider, with the resulting rates effective for usage on and after January 1, 2016. The PUCT approved the settlement agreement in February 2016.

In June 2017, Entergy Texas filed an application to amend its DCRF rider by increasing the total collection from $8.65 million to approximately $19 million. In July 2017, Entergy Texas, the PUCT, and the two other parties in the proceeding entered into an unopposed stipulation and settlement agreement resulting in an amended DCRF annual revenue requirement of $18.3 million, with the resulting rates effective for usage no later than October 1, 2017. In September 2017 the PUCT issued its final order approving the unopposed stipulation and settlement agreement. The amended DCRF rider rates became effective for usage on and after September 1, 2017.
    
Transmission cost recovery factor (TCRF) rider

In September 2015, Entergy Texas filed for a TCRF rider requesting a $13 million increase, incremental to base rates. Testimony was filed in November 2015, with the PUCT staff and other parties proposing various disallowances involving, among other things, MISO charges, vegetation management costs, and bad debt expenses that would reduce the requested increase by approximately $2 million. In addition to those recommended disallowances, a number of parties recommended that Entergy Texas’s request be reduced by an additional $3.4 million to account for load growth since base rates were last set. A hearing on the merits was held in December 2015. In February 2016 a State Office of Administrative Hearings ALJ issued a proposal for decision recommending that the PUCT disallow approximately $2 million from Entergy Texas’s $13 million request, but recommending that the PUCT not accept the load growth offset. In June 2016 the PUCT indicated that it would take up in a future rulemaking project the issue of whether a load growth adjustment should apply to a TCRF. In July 2016 the PUCT issued an order generally accepting the proposal for decision but declining to adjust the TCRF baseline in two instances as recommended by the ALJ, which resulted in a total annual allowance of approximately $10.5 million. The PUCT also ordered its staff and Entergy Texas to track all spare autotransformer transfers going forward so that it could address the appropriate accounting treatment and prudence of such transfers in Entergy Texas’s next base rate case. Entergy Texas implemented the TCRF rider beginning with September 2016 bills.

In September 2016, Entergy Texas filed with the PUCT a request to amend its TCRF rider. The proposed amended TCRF rider is designed to collect approximately $29.5 million annually from Entergy Texas’s retail customers. This amount includes the approximately $10.5 million annually that Entergy Texas is currently authorized to collect through the TCRF rider, as discussed above. In December 2016, concurrent with the 2016 fuel reconciliation stipulation and settlement agreement discussed above, Entergy Texas and the PUCT reached a settlement agreeing to the amended TCRF annual revenue requirement of $29.5 million. As discussed above, the terms of the two settlements are interdependent. The PUCT approved the settlement and issued a final order in March 2017. Entergy Texas implemented the amended TCRF rider beginning with bills covering usage on and after March 20, 2017.

Advanced Metering Infrastructure (AMI) Filings

Entergy Arkansas

In September 2016, Entergy Arkansas filed an application seeking a finding from the APSC that Entergy Arkansas’s deployment of AMI is in the public interest. Entergy Arkansas proposed to replace existing meters with advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems. AMI is intended to serve as the foundation of Entergy Arkansas’s modernized power grid. The filing included an estimate of implementation costs for AMI of $208 million. The filing identified a number of quantified and unquantified benefits, and Entergy Arkansas provided a cost benefit analysis showing that its AMI deployment is expected to produce a nominal net benefit to customers of $406 million. Entergy Arkansas also sought to continue to include in rate base the remaining book value of existing meters, which was approximately $57 million at December 31, 2015, that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates. Entergy Arkansas proposed a 15-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019. Deployment of the communications network is expected to begin in 2018. Entergy Arkansas proposed to include the AMI deployment costs and the quantified benefits in future formula rate plan filings, and the 2018 costs were approved in the 2017 formula rate plan filing. In June 2017 the APSC staff and Arkansas Attorney General filed direct testimony. The APSC staff generally supported Entergy Arkansas’s AMI deployment conditioned on various recommendations. The Arkansas Attorney General’s consultant primarily recommended denial of Entergy Arkansas’s application but alternatively suggested recommendations in the event the APSC approves Entergy Arkansas’s proposal. Entergy Arkansas filed rebuttal testimony in June 2017, substantially accepting the APSC staff’s recommendations. In August 2017, Entergy Arkansas and the parties to the proceeding filed a joint motion to approve a unanimous settlement agreement. In October 2017 the APSC issued an order finding that Entergy Arkansas’s AMI deployment is in the public interest and approving the settlement agreement subject to a minor modification. Entergy Arkansas expects to recover the undepreciated balance of its existing meters through a regulatory asset to be amortized over 15 years. Entergy Arkansas has begun discussions with the other parties to implement the items in the settlement agreement including pre-pay and time of use programs.

Entergy Louisiana

In November 2016, Entergy Louisiana filed an application seeking a finding from the LPSC that Entergy Louisiana’s deployment of advanced electric and gas metering infrastructure is in the public interest. Entergy Louisiana proposed to deploy advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems. AMI is intended to serve as the foundation of Entergy Louisiana’s modernized power grid. The filing included an estimate of implementation costs for AMI of $330 million. The filing identified a number of quantified and unquantified benefits, and Entergy Louisiana provided a cost/benefit analysis showing that its combined electric and gas AMI deployment is expected to produce a nominal net benefit to customers of $607 million. Entergy Louisiana also sought to continue to include in rate base the remaining book value, approximately $92 million at December 31, 2015, of the existing electric meters and also to depreciate those assets using current depreciation rates. Entergy Louisiana proposed a 15-year useful life for the new advanced meters, the three-year deployment of which is expected to begin in 2019. The communications network deployment is expected to begin by late-2018, after the necessary information technology infrastructure is in place. Entergy Louisiana proposed to recover the cost of AMI through the implementation of a customer charge, net of certain benefits, phased in over the period 2019 through 2022. The parties reached an uncontested stipulation permitting implementation of Entergy Louisiana’s proposed AMI system, with modifications to the proposed customer charge. In July 2017 the LPSC approved the stipulation. Entergy Louisiana expects to recover the undepreciated balance of its existing meters through a regulatory asset to be amortized at current depreciation rates.

Entergy Mississippi

In November 2016, Entergy Mississippi filed an application seeking an order from the MPSC granting a certificate of public convenience and necessity and finding that Entergy Mississippi’s deployment of AMI is in the public interest. Entergy Mississippi proposed to replace existing meters with advanced meters that enable two-way data communication; to design and build a secure and reliable network to support such communications; and to implement support systems. AMI is intended to serve as the foundation of Entergy Mississippi’s modernized power grid. The filing included an estimate of implementation costs for AMI of $132 million. The filing identified a number of quantified and unquantified benefits, and Entergy Mississippi provided a cost benefit analysis showing that its AMI deployment is expected to produce a nominal benefit to customers of $496 million over a 15-year period, which when netted against the costs of AMI results in $183 million of net customer benefits. Entergy Mississippi also sought to continue to include in rate base the remaining book value, approximately $56 million at December 31, 2015, of existing meters that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates. Entergy Mississippi proposed a 15-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019, subject to approval by the MPSC, with deployment of the communications network expected to begin in 2018. Entergy Mississippi proposed to include the AMI deployment costs and the quantified benefits in existing rate mechanisms, primarily through future formula rate plan filings and/or future energy cost recovery rider schedule re-determinations, as applicable. In May 2017 the Mississippi Public Utilities Staff and Entergy Mississippi entered into and filed a joint stipulation supporting Entergy Mississippi’s filing, and the MPSC issued an order approving the filing without material changes, finding that Entergy Mississippi’s deployment of AMI is in the public interest and granting a certificate of public convenience and necessity. The MPSC order also confirmed that Entergy Mississippi shall continue to include in rate base the remaining book value of existing meters that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates.

Entergy New Orleans

In October 2016, Entergy New Orleans filed an application seeking a finding from the City Council that Entergy New Orleans’s deployment of advanced electric and gas metering infrastructure is in the public interest.  Entergy New Orleans proposed to deploy advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems.  AMI is intended to serve as the foundation of Entergy New Orleans’s modernized power grid.  The filing included an estimate of implementation costs for AMI of $75 million. The filing identified a number of quantified and unquantified benefits, and Entergy New Orleans provided a cost/benefit analysis showing that its combined electric and gas AMI deployment is expected to produce a nominal net benefit to customers of $101 million.  Entergy New Orleans also sought to continue to include in rate base the remaining book value, approximately $21 million at December 31, 2015, of the existing electric meters and also to depreciate those assets using current depreciation rates.  Entergy New Orleans proposed a 15-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019.  Deployment of the information technology infrastructure began in 2017 and deployment of the communications network is expected to begin in 2018.  Entergy New Orleans proposed to recover the cost of AMI through the implementation of a customer charge, net of certain benefits, phased in over the period 2019 through 2022.  The City Council’s advisors filed testimony in May 2017 recommending the adoption of AMI subject to certain modifications, including the denial of Entergy New Orleans’s proposed customer charge as a cost recovery mechanism. In January 2018 a settlement was reached between the City Council’s advisors and Entergy New Orleans. In February 2018 the City Council approved the settlement, which deferred cost recovery to the 2018 Entergy New Orleans rate case, but also stated that an adjustment for 2018-2019 AMI costs can be filed in the rate case and that, for all subsequent AMI costs, the mechanism to be approved in the 2018 rate case will allow for the timely recovery of such costs.

Entergy Texas

In April 2017 the Texas legislature enacted legislation that extends statutory support for AMI deployment to Entergy Texas and directs that if Entergy Texas elects to deploy AMI, it shall do so as rapidly as practicable. In July 2017, Entergy Texas filed an application seeking an order from the PUCT approving Entergy Texas’s deployment of AMI. Entergy Texas proposed to replace existing meters with advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems. AMI is intended to serve as the foundation of Entergy Texas’s modernized power grid. The filing included an estimate of implementation costs for AMI of $132 million. The filing identified a number of quantified and unquantified benefits, with Entergy Texas showing that its AMI deployment is expected to produce nominal net operational cost savings to customers of $33 million. Entergy Texas also sought to continue to include in rate base the remaining book value, approximately $41 million at December 31, 2016, of existing meters that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates. Entergy Texas proposed a seven-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019. Entergy Texas also proposed a surcharge tariff to recover the reasonable and necessary costs it has and will incur under the deployment plan for the full deployment of advanced meters. Further, Entergy Texas sought approval of fees that would be charged to customers who choose to opt out of receiving service through an advanced meter and instead receive electric service with a non-standard meter. In October 2017, Entergy Texas and other parties entered into and filed an unopposed stipulation and settlement agreement, permitting deployment of AMI with limited modifications. The PUCT approved the stipulation and settlement agreement in December 2017. Consistent with the approval, deployment of the communications network is expected to begin in 2018. Entergy Texas expects to recover the remaining net book value of its existing meters through a regulatory asset to be amortized at current depreciation rates.

Entergy Louisiana and Entergy Gulf States Louisiana Business Combination

Entergy Louisiana and Entergy Gulf States Louisiana filed an application with the LPSC in September 2014 seeking authorization to undertake transactions that would result in the combination of Entergy Louisiana and Entergy Gulf States Louisiana into a single public utility. An uncontested stipulated settlement (stipulated settlement) was filed with the LPSC in July 2015. Through the stipulated settlement, the parties agreed to terms upon which to recommend that the LPSC find that the business combination was in the public interest. The stipulated settlement, which was either joined, or unopposed, by all parties to the LPSC proceeding, represented a compromise of stakeholder positions and was the result of an extensive period of analysis, discovery, and negotiation. The stipulated settlement provided $107 million in guaranteed customer benefits during the first nine years following the transaction’s close. Additionally, the combined company would honor the 2013 Entergy Louisiana and Entergy Gulf States Louisiana rate case settlements, including the commitments that (1) there would be no rate increase for legacy Entergy Gulf States Louisiana customers for the 2014 test year, and (2) through the 2016 test year formula rate plan, Entergy Louisiana (as a combined entity) would not raise rates by more than $30 million, net of the $10 million rate increase included in the Entergy Louisiana legacy formula rate plan. The stipulated settlement also provided that Entergy Gulf States Louisiana and Entergy Louisiana would be permitted to defer certain external costs that were incurred to achieve the business combination’s customer benefits. In 2015 deferrals of $16 million for these external costs were recorded, and they are being amortized over a 10-year period. The LPSC approved the business combination in August 2015.

On October 1, 2015, the businesses formerly conducted by Entergy Louisiana and Entergy Gulf States Louisiana were combined into a single public utility. With the completion of the business combination, Entergy Louisiana holds substantially all of the assets, and has assumed the liabilities, of Entergy Louisiana and Entergy Gulf States Louisiana. The combination was accounted for as a transaction between entities under common control. See Note 3 to the financial statements for further discussion of the customer credits resulting from the business combination.

Algiers Asset Transfer (Entergy Louisiana and Entergy New Orleans)

In October 2014, Entergy Louisiana and Entergy New Orleans filed an application with the City Council seeking authorization to undertake a transaction that would result in the transfer from Entergy Louisiana to Entergy New Orleans of certain assets that supported the provision of service to Entergy Louisiana’s customers in Algiers. In April 2015 the FERC issued an order approving the Algiers assets transfer. In May 2015 the parties filed a settlement agreement authorizing the Algiers assets transfer and the settlement agreement was approved by a City Council resolution in May 2015. On September 1, 2015, Entergy Louisiana transferred its Algiers assets to Entergy New Orleans for a purchase price of approximately $85 million. Entergy New Orleans paid Entergy Louisiana $59.6 million, including final true-ups, from available cash and issued a note payable to Entergy Louisiana in the amount of $25.5 million.

System Agreement Cost Equalization Proceedings

Prior to its final termination in 2016, the Utility operating companies historically engaged in the coordinated planning, construction, and operation of generating and bulk transmission facilities under the terms of the System Agreement.  Entergy Arkansas terminated its participation in the System Agreement in December 2013. Entergy Mississippi terminated its participation in the System Agreement in November 2015. The System Agreement terminated with respect to its remaining participants in August 2016.

Although the System Agreement has terminated, certain of the Utility operating companies’ retail regulators continue to pursue litigation involving the System Agreement at the FERC and in federal courts.  The proceedings include challenges to the allocation of costs as defined by the System Agreement and other matters.

In June 2005 the FERC issued a decision in System Agreement litigation that had been commenced by the LPSC, and essentially affirmed its decision in a December 2005 order on rehearing.  The decision included, among other things:

The FERC’s conclusion that the System Agreement no longer roughly equalizes total production costs among the Utility operating companies.
In order to reach rough production cost equalization, the FERC imposed a bandwidth remedy by which each company’s total annual production costs will have to be within +/- 11% of Entergy System average total annual production costs.
In calculating the production costs for this purpose under the FERC’s order, output from the Vidalia hydroelectric power plant will not reflect the actual Vidalia price for the year but is priced at that year’s average price paid by Entergy Louisiana for the exchange of electric energy under Service Schedule MSS-3 of the System Agreement, thereby reducing the amount of Vidalia costs reflected in the comparison of the Utility operating companies’ total production costs.
The remedy ordered by the FERC in 2005 required no refunds and became effective based on calendar year 2006 production costs and the first reallocation payments were made in 2007.
The FERC’s decision reallocated total production costs of the Utility operating companies whose relative total production costs expressed as a percentage of Entergy System average production costs are outside an upper or lower bandwidth.  This was accomplished by payments from Utility operating companies whose production costs were more than 11% below Entergy System average production costs to Utility operating companies whose production costs were more than the Entergy System average production cost, with payments going first to those Utility operating companies whose total production costs were farthest above the Entergy System average.

The LPSC, APSC, MPSC, and the Arkansas Electric Energy Consumers appealed the FERC’s December 2005 decision to the United States Court of Appeals for the D.C. Circuit.  Entergy and the City of New Orleans intervened in the various appeals.  The D.C. Circuit issued its decision in April 2008.  The D.C. Circuit concluded that the FERC’s orders had failed to adequately explain both its conclusion that it was prohibited from ordering refunds for the 20-month period from September 13, 2001 - May 2, 2003 and its determination to implement the bandwidth remedy commencing on January 1, 2006, rather than June 1, 2005.  The D.C. Circuit remanded the case to the FERC for further proceedings on those two issues.

In October 2011 the FERC issued an order addressing the D.C. Circuit remand on the two issues.  On the first issue, the FERC concluded that it did have the authority to order refunds, but decided that it would exercise its equitable discretion and not require refunds for the 20-month period from September 13, 2001 - May 2, 2003.  Because the ruling on refunds relied on findings in the interruptible load proceeding, which is discussed in a separate section below, the FERC concluded that this refund ruling will be held in abeyance pending the outcome of the rehearing requests in the interruptible load proceeding.  On the second issue, the FERC reversed its prior decision and ordered that the prospective bandwidth remedy begin on June 1, 2005 (the date of its initial order in the proceeding) rather than January 1, 2006, as it had previously ordered.  Pursuant to the October 2011 order, Entergy was required to calculate bandwidth payments for the period June - December 2005 utilizing the bandwidth formula tariff prescribed by the FERC that was filed in a December 2006 compliance filing and accepted by the FERC in an April 2007 order.  

In March 2015, in light of a December 2014 decision by the D.C. Circuit in the interruptible load proceeding, Entergy filed with the FERC a motion to establish a briefing schedule on refund issues and an initial brief addressing refund issues. The initial brief argued that the FERC, in response to the D.C. Circuit decision, should clarify its policy on refunds and find that refunds are not required in this proceeding. In October 2015 the FERC issued three orders related to the commencement of the remedy on June 1, 2005 and the inclusion of interest for the period June 1, 2005 through December 31, 2005. Specifically, the FERC rejected Entergy’s request for rehearing of its decision to include interest for the seven-month period. The FERC also rejected Entergy’s request for rehearing of the order rejecting the compliance filing with regard to the issue of interest. Finally, the FERC set for hearing and settlement procedures the 2014 compliance filing that included the bandwidth calculation for the seven months June 1, 2005 through December 31, 2005. In setting the compliance filing for hearing, the FERC rejected the APSC’s protest that Entergy Arkansas should not be subject to the filing because Entergy Arkansas would be making the payments during a period following its exit from the System Agreement. In January 2018 the D.C.Circuit affirmed the FERC decision that Entergy Arkansas was subject to the filing.

In December 2011, Entergy filed with the FERC its compliance filing that provides the payments and receipts among the Utility operating companies pursuant to the FERC’s October 2011 order.  The APSC, the LPSC, the PUCT, and other parties intervened in the December 2011 compliance filing proceeding, and the APSC and the LPSC also filed protests. The filing shows the following payments/receipts among the Utility operating companies:

 
Payments (Receipts)
 
(In Millions)
Entergy Arkansas
$156
Entergy Louisiana
($75)
Entergy Mississippi
($33)
Entergy New Orleans
($5)
Entergy Texas
($43)


Entergy Arkansas made its payment in January 2012.  In February 2012, Entergy Arkansas filed for an interim adjustment to its production cost allocation rider requesting that the $156 million be collected from customers over the 22-month period from March 2012 through December 2013.  In March 2012 the APSC issued an order stating that the payment can be recovered from retail customers through the production cost allocation rider, subject to refund.  The LPSC and the APSC requested rehearing of the FERC’s October 2011 order.  

In February 2014 the FERC issued a rehearing order addressing its October 2011 order. The FERC denied the LPSC’s request for rehearing on the issues of whether the bandwidth remedy should be made effective earlier than June 1, 2005, and whether refunds should be ordered for the 20-month refund effective period. The FERC granted the LPSC’s rehearing request on the issue of interest on the bandwidth payments/receipts for the June - December 2005 period, requiring that interest be accrued from June 1, 2006 until the date those bandwidth payments/receipts are made. Also in February 2014 the FERC issued an order rejecting the December 2011 compliance filing that calculated the bandwidth payments/receipts for the June - December 2005 period. The FERC order required a new compliance filing that calculates the bandwidth payments/receipts for the June - December 2005 period based on monthly data for the seven individual months including interest pursuant to the February 2014 rehearing order. Entergy sought rehearing of the February 2014 order with respect to the FERC’s determinations regarding interest. In April 2014 the LPSC filed a petition for review of the FERC’s October 2011 and February 2014 orders with the U.S. Court of Appeals for the D.C. Circuit. In August 2017 the D.C. Circuit issued a decision addressing the LPSC’s appeal of the FERC’s October 2011 and February 2014 orders. On the issue of the FERC’s implementation of the prospective remedy as of June 2005 and whether the bandwidth remedy should be extended for an additional 17 months in years 2004-2005, the D.C. Circuit affirmed the FERC’s implementation of the remedy and denied the LPSC’s appeal. On the issue of whether the operating companies should be required to issue refunds for the 20-month period from September 2001 to May 2003, the D.C. Circuit granted the FERC’s request for agency reconsideration and remanded that issue back to the FERC for further proceedings as requested by all parties to the appeal.

In April and May 2014, Entergy filed with the FERC an updated compliance filing that provides the payments and receipts among the Utility operating companies pursuant to the FERC’s February 2014 orders.  The filing shows the following net payments and receipts, including interest, among the Utility operating companies:
 
Payments (Receipts)
 
(In Millions)
Entergy Arkansas
$68
Entergy Louisiana
($10)
Entergy Mississippi
($11)
Entergy New Orleans
$2
Entergy Texas
($49)

These payments were made in May 2014. The LPSC, City Council, and APSC filed protests.

The hearing on the bandwidth calculation for the seven months June 1, 2005 through December 31, 2005 occurred in July 2016. The presiding judge issued an initial decision in November 2016. In the initial decision, the presiding judge agreed with the Utility operating companies’ position that: (1) interest on the bandwidth payments for the 2005 test period should be accrued from June 1, 2006 until the date that the bandwidth payments for that calculation are paid, which is consistent with how the Utility operating companies performed the calculation; and (2) a portion of Entergy Louisiana’s 2001-vintage Louisiana state net operating loss accumulated deferred income tax that results from the Vidalia tax deduction should be excluded from the 2005 test period bandwidth calculation. Various participants filed briefs on exceptions and/or briefs opposing exceptions related to the initial decision, including the LPSC, the APSC, the FERC trial staff, and Entergy Services. The initial decision is pending before the FERC.

Rough Production Cost Equalization Rates

Each May from 2007 through 2016 Entergy filed with the FERC the rates to implement the FERC’s orders in the System Agreement proceeding.  These filings showed the following payments/receipts among the Utility operating companies were necessary to achieve rough production cost equalization as defined by the FERC’s orders:
 
Payments (Receipts)
 
2007
 
2008
 
2009
 
2010
 
2011
 
2012
 
2013
 
2014
 
(In Millions)
Entergy Arkansas

$252

 

$252

 

$390

 

$41

 

$77

 

$41

 

$—

 

$—

Entergy Louisiana

($211
)
 

($160
)
 

($247
)
 

($22
)
 

($12
)
 

($41
)
 

$—

 

$—

Entergy Mississippi

($41
)
 

($20
)
 

($24
)
 

($19
)
 

($40
)
 

$—

 

$—

 

$—

Entergy New Orleans

$—

 

($7
)
 

$—

 

$—

 

($25
)
 

$—

 

($15
)
 

($15
)
Entergy Texas

($30
)
 

($65
)
 

($119
)
 

$—

 

$—

 

$—

 

$15

 

$15



The Utility operating companies recorded accounts payable or accounts receivable to reflect the rough production cost equalization payments and receipts required to implement the FERC’s remedy.  When accounts payable were recorded, a corresponding regulatory asset was recorded for the right to collect the payments from customers. When accounts receivable were recorded, a corresponding regulatory liability was recorded for the obligations to pass the receipts on to customers.  No payments were required in 2016 or 2015 to implement the FERC’s remedy based on calendar year 2015 production costs and 2014 production costs, respectively. The System Agreement terminated in August 2016.

The APSC approved a production cost allocation rider for recovery from customers of the retail portion of the costs allocated to Entergy Arkansas.  Entergy Texas recovered its 2013 rough production cost equalization payment over three years beginning April 2014. Entergy Texas included its 2014 rough production cost equalization payment as a component of an interim fuel refund made in 2014. Management believes that any changes in the allocation of production costs resulting from the FERC’s decision and related retail proceedings should result in similar rate changes for retail customers, subject to specific circumstances that have caused trapped costs.

The following rough production cost equalization rate proceedings are still ongoing.

2010 Rate Filing Based on Calendar Year 2009 Production Costs

In May 2010, Entergy filed with the FERC the 2010 rates in accordance with the FERC’s orders in the System Agreement proceeding, and supplemented the filing in September 2010.  Several parties intervened in the proceeding at the FERC, including the LPSC and the City Council, which also filed protests.  In July 2010 the FERC accepted Entergy’s proposed rates for filing, effective June 1, 2010, subject to refund.  After an abeyance of the proceeding schedule, a hearing was held in March 2014 and in December 2015 the FERC issued an order. Among other things, the December 2015 order directed Entergy to submit a compliance filing. In January 2016 the LPSC, the APSC, and Entergy filed requests for rehearing of the FERC’s December 2015 order. In February 2016, Entergy submitted the compliance filing ordered in the December 2015 order.  The result of the true-up payments and receipts for the recalculation of production costs resulted in the following payments/receipts among the Utility operating companies:
 
Payments (Receipts)
 
(In Millions)
Entergy Arkansas
$2
Entergy Louisiana
$6
Entergy Mississippi
($4)
Entergy New Orleans
($1)
Entergy Texas
($3)

 
In September 2016 the FERC accepted the February 2016 compliance filing subject to a further compliance filing made in November 2016. The further compliance filing was required as a result of an order issued in September 2016 ruling on the January 2016 rehearing requests filed by the LPSC, the APSC, and Entergy. In the order addressing the rehearing requests, the FERC granted the LPSC’s rehearing request and directed that interest be calculated on the payment/receipt amounts. The FERC also granted the APSC’s and Entergy’s rehearing request and ordered the removal of both securitized asset accumulated deferred income taxes and contra-securitization accumulated deferred income taxes from the calculation. In November 2016, Entergy submitted its compliance filing in response to the FERC’s order on rehearing. The compliance filing included a revised refund calculation of the true-up payments and receipts based on 2009 test year data and interest calculations. The LPSC protested the interest calculations. In November 2017 the FERC issued an order rejecting the November 2016 compliance filing. The FERC determined that the payments detailed in the November 2016 compliance filing did not include adequate interest for the payments from Entergy Arkansas to Entergy Louisiana because it did not include interest on the principal portion of the payment that was made in February 2016. In December 2017, Entergy recalculated the interest pursuant to the November 2017 order. As a result of the recalculations, Entergy Arkansas owed very minor payments to Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans.

2011 Rate Filing Based on Calendar Year 2010 Production Costs

In May 2011, Entergy filed with the FERC the 2011 rates in accordance with the FERC’s orders in the System Agreement proceeding.  Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest.  In July 2011 the FERC accepted Entergy’s proposed rates for filing, effective June 1, 2011, subject to refund. After an abeyance of the proceeding schedule, in December 2014 the FERC consolidated the 2011 rate filing with the 2012, 2013, and 2014 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

2012 Rate Filing Based on Calendar Year 2011 Production Costs

In May 2012, Entergy filed with the FERC the 2012 rates in accordance with the FERC’s orders in the System Agreement proceeding.  Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest.  In August 2012 the FERC accepted Entergy’s proposed rates for filing, effective June 2012, subject to refund. After an abeyance of the proceeding schedule, in December 2014 the FERC consolidated the 2012 rate filing with the 2011, 2013, and 2014 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

2013 Rate Filing Based on Calendar Year 2012 Production Costs

In May 2013, Entergy filed with the FERC the 2013 rates in accordance with the FERC’s orders in the System Agreement proceeding. Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest. The City Council intervened and filed comments related to including the outcome of a related FERC proceeding in the 2013 cost equalization calculation. In August 2013 the FERC issued an order accepting the 2013 rates, effective June 1, 2013, subject to refund. After an abeyance of the proceeding schedule, in December 2014 the FERC consolidated the 2013 rate filing with the 2011, 2012, and 2014 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

2014 Rate Filing Based on Calendar Year 2013 Production Costs

In May 2014, Entergy filed with the FERC the 2014 rates in accordance with the FERC’s orders in the System Agreement proceeding. Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest. The City Council intervened and filed comments. In December 2014 the FERC issued an order accepting the 2014 rates, effective June 1, 2014, subject to refund, set the proceeding for hearing procedures, and consolidated the 2014 rate filing with the 2011, 2012, and 2013 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

Consolidated 2011, 2012, 2013, and 2014 Rate Filing Proceedings

As discussed above, in December 2014 the FERC consolidated the 2011, 2012, 2013, and 2014 rate filings for settlement and hearing procedures. In May 2015, Entergy filed direct testimony in the consolidated rate filings and the LPSC filed direct testimony concerning its complaint proceeding that is consolidated with the rate filings, challenging certain components of the pending bandwidth calculations for prior years. Hearings occurred in November 2015, and the ALJ issued an initial decision in July 2016. In the initial decision, the ALJ generally agreed with Entergy’s bandwidth calculations with one exception on the accounting related to the Waterford 3 sale/leaseback. Briefs were filed in September 2016 and the proceeding is pending.

Utility Operating Company Termination of System Agreement Participation

Entergy Arkansas and Entergy Mississippi ceased participating in the System Agreement effective December 18, 2013 and November 7, 2015, respectively. Entergy Louisiana, Entergy New Orleans, and Entergy Texas terminated participation in the System Agreement on August 31, 2016, which resulted in the termination of the System Agreement in its entirety pursuant to a settlement agreement approved by the FERC in December 2015.

In December 2013 the FERC set one issue for hearing involving whether and how the benefits associated with settlement with Union Pacific regarding certain coal delivery issues should be allocated among Entergy Arkansas and the other Utility operating companies post-termination of the System Agreement. In December 2014 a FERC ALJ issued an initial decision finding that Entergy Arkansas would realize benefits after December 18, 2013 from the 2008 settlement agreement between Entergy Services, Entergy Arkansas, and Union Pacific, related to certain coal delivery issues. The ALJ further found that all of the Utility operating companies should share in those benefits pursuant to a methodology proposed by the MPSC. The Utility operating companies and other parties to the proceeding filed briefs on exceptions and/or briefs opposing exceptions with the FERC challenging various aspects of the December 2014 initial decision. In March 2016 the FERC issued an opinion affirming the December 2014 initial decision with regard to the determination that there were benefits related to the Union Pacific settlement, which were realized post-Entergy Arkansas’s December 2013 withdrawal from the System Agreement, that should be shared with the other Utility operating companies utilizing the methodology proposed by the MPSC and trued-up to actual coal volumes purchased. In May 2016, Entergy made a compliance filing that provided the calculation of Union Pacific settlement benefits utilizing the methodology adopted by the initial decision, trued-up for the actual volumes of coal purchased. The payments were made in May 2016. In August 2016 the FERC issued an order accepting Entergy’s compliance filing. Also in August 2016 the APSC filed a petition for review of the FERC’s March 2016 and August 2016 orders with the U.S. Court of Appeals for the D.C. Circuit. Oral argument before the D.C. Circuit was held on the APSC’s petition in January 2018 and a decision is pending.

In connection with the System Agreement termination settlement agreement, the purchase power agreements, referred to as the jurisdictional separation plan PPAs, between Entergy Texas and Entergy Gulf States Louisiana that were put in place for certain legacy gas units at the time of Entergy Gulf States’s separation into Entergy Texas and Entergy Gulf States Louisiana terminated effective with the System Agreement termination. Similarly, the purchase power agreement between Entergy Gulf States Louisiana and Entergy Texas for the Calcasieu unit also terminated. In March 2016, Entergy Services filed with the FERC the notices of termination. The jurisdictional separation plan PPAs were the means by which Entergy Texas received payment for its receivable associated with Entergy Louisiana’s Spindletop gas storage facility regulatory asset. As a result of the System Agreement termination settlement agreement, effective with the termination date, Entergy Texas no longer receives payments from Entergy Louisiana related to the Spindletop storage facility, which resulted in a write-off recorded in 2015 by Entergy Texas of $23.5 million ($15.3 million net-of-tax). Upon termination of the System Agreement, other purchase power agreements entered into under Service Schedule MSS-4 of the System Agreement were replaced with updated agreements under a FERC-jurisdictional tariff effective September 1, 2016.

Interruptible Load Proceeding

In April 2007 the U.S. Court of Appeals for the D.C. Circuit issued its opinion in the LPSC’s appeal of the FERC’s March 2004 and April 2005 orders related to the treatment under the System Agreement of the Utility operating companies’ interruptible loads.  In its opinion the D.C. Circuit concluded that the FERC: (1) acted arbitrarily and capriciously by allowing the Utility operating companies to phase-in the effects of the elimination of the interruptible load over a 12-month period of time; (2) failed to adequately explain why refunds could not be ordered under Section 206(c) of the Federal Power Act; and (3) exercised appropriately its discretion to defer addressing the cost of sulfur dioxide allowances until a later time.  The D.C. Circuit remanded the matter to the FERC for a more considered determination on the issue of refunds.  The FERC issued its order on remand in September 2007, in which it directed Entergy to make a compliance filing removing all interruptible load from the computation of peak load responsibility commencing April 1, 2004 and to issue any necessary refunds to reflect this change.  In addition, the order directed the Utility operating companies to make refunds for the period May 1995 through July 1996.  In November 2007 the Utility operating companies filed a refund report describing the refunds to be issued pursuant to the FERC’s orders.  The LPSC filed a protest to the refund report in December 2007, and the Utility operating companies filed an answer to the protest in January 2008.  The refunds were made in October 2008 by the Utility operating companies that owed refunds to the Utility operating companies that were due refunds under the decision.  The APSC and the Utility operating companies appealed the FERC decisions to the D.C. Circuit.

Following the filing of petitioners’ initial briefs, the FERC filed a motion requesting the D.C. Circuit hold the appeal of the FERC’s decisions ordering refunds in the interruptible load proceeding in abeyance and remand the record to the FERC.  The D.C. Circuit granted the FERC’s unopposed motion in June 2009.  In December 2009 the FERC established a paper hearing to determine whether the FERC had the authority and, if so, whether it would be appropriate to order refunds resulting from changes in the treatment of interruptible load in the allocation of capacity costs by the Utility operating companies.  In August 2010 the FERC issued an order stating that it has the authority and refunds are appropriate.  The APSC, the MPSC, and Entergy requested rehearing of the FERC’s decision.  In June 2011 the FERC issued an order granting rehearing in part and denying rehearing in part, in which the FERC determined to invoke its discretion to deny refunds.  The FERC held that in this case where “the Entergy system as a whole collected the proper level of revenue, but, as was later established, incorrectly allocated peak load responsibility among the various Entergy operating companies….the Commission will apply here our usual practice in such cases, invoking our equitable discretion to not order refunds, notwithstanding our authority to do so.”  The LPSC has requested rehearing of the FERC’s June 2011 decision.  In July 2011 the refunds made in the fourth quarter 2009 described above were reversed. In October 2011 the FERC issued an “Order Establishing Paper Hearing” inviting parties that oppose refunds to file briefs within 30 days addressing the LPSC’s argument that FERC precedent supports refunds under the circumstances present in this proceeding.  Parties that favor refunds were then invited to file reply briefs within 21 days of the date that the initial briefs were due.  

In September 2010 the FERC had issued an order setting the refund report filed in the proceeding in November 2007 for hearing and settlement judge procedures.  In May 2011, Entergy filed a settlement agreement that resolved all issues relating to the refund report set for hearing.  In June 2011 the settlement judge certified the settlement as uncontested.  The settlement agreement was approved by the FERC in September 2016.

Prior to the FERC’s June 2011 order on rehearing, Entergy Arkansas filed an application in November 2010 with the APSC for recovery of the refund that it paid.  The APSC denied Entergy Arkansas’s application, and also denied Entergy Arkansas’s petition for rehearing.  If the FERC were to order Entergy Arkansas to pay refunds on rehearing in the interruptible load proceeding the APSC’s decision would trap FERC-approved costs at Entergy Arkansas with no regulatory-approved mechanism to recover them.  In August 2011, Entergy Arkansas filed a complaint in the United States District Court for the Eastern District of Arkansas asking for a declaratory judgment that the rejection of Entergy Arkansas’s application by the APSC is preempted by the Federal Power Act.  The APSC filed a motion to dismiss the complaint.  In April 2012 the United States district court dismissed Entergy Arkansas’s complaint without prejudice stating that Entergy Arkansas’s claim is not ripe for adjudication and that Entergy Arkansas did not have standing to bring suit at this time.

In March 2013 the FERC issued an order denying the LPSC’s request for rehearing of the FERC’s June 2011 order wherein the FERC concluded it would exercise its discretion and not order refunds in the interruptible load proceeding. Based on its review of the LPSC’s request for rehearing and the briefs filed as part of the paper hearing established in October 2011, the FERC affirmed its earlier ruling and declined to order refunds under the circumstances of the case. In May 2013 the LPSC filed a petition for review with the U.S. Court of Appeals for the D.C. Circuit seeking review of FERC prior orders in the interruptible load proceeding that concluded that the FERC would exercise its discretion and not order refunds in the proceeding. Oral argument was held on the appeal in the D.C. Circuit in September 2014. In December 2014 the D.C. Circuit issued an order on the LPSC’s appeal and remanded the case back to the FERC. The D.C. Circuit rejected the LPSC’s argument that there is a presumption in favor of refunds, but it held that the FERC had not adequately explained its decision to deny refunds and directed the FERC “to consider the relevant factors and weigh them against one another.” In March 2015, Entergy filed with the FERC a motion to establish a briefing schedule on remand and an initial brief on remand to address the December 2014 decision by the D.C. Circuit. The initial brief on remand argued that the FERC, in response to the D.C. Circuit decision, should clarify its policy on refunds and find that refunds are not required in the interruptible load proceeding.

In April 2016 the FERC issued an order on remand that addressed the December 2014 decision by the D.C. Circuit in the interruptible load proceeding. The order on remand affirmed the FERC’s denial of refunds for the 15-month refund effective period. The FERC explained and clarified its policies regarding refunds and concluded that the evidence in the record demonstrated that the relevant equitable factors favored not requiring refunds in this case. The FERC also noted that, under Section 206(c) of the Federal Power Act, in a Section 206 proceeding involving two or more electric utility companies of a registered holding company system, the FERC may order refunds only if it determines the refunds would not cause the registered holding company to experience any reduction in revenues resulting from an inability of an electric utility company in the system to recover the resulting increase in costs. The FERC stated it was not able to find that the Entergy system would not experience a reduction in revenues if refunds were awarded in this proceeding, which further supported the denial of refunds. In May 2016 the LPSC filed a request for rehearing of the FERC’s April 2016 order. In September 2016 the FERC issued an order denying the LPSC’s request for rehearing and reaffirming its denial of refunds for the 15-month refund effective period. The LPSC has appealed the April and September 2016 orders to the U.S. Court of Appeals for the D.C. Circuit. Oral argument before the D.C. Circuit was held before the D.C. Circuit in February 2018 and a decision is pending.
 
Entergy Arkansas Opportunity Sales Proceeding

In June 2009 the LPSC filed a complaint requesting that the FERC determine that certain of Entergy Arkansas’s sales of electric energy to third parties: (a) violated the provisions of the System Agreement that allocated the energy generated by Entergy System resources; (b) imprudently denied the Entergy System and its ultimate consumers the benefits of low-cost Entergy System generating capacity; and (c) violated the provision of the System Agreement that prohibited sales to third parties by individual companies absent an offer of a right-of-first-refusal to other Utility operating companies.   The LPSC’s complaint challenged sales made beginning in 2002 and requested refunds.  In July 2009 the Utility operating companies filed a response to the complaint requesting that the FERC dismiss the complaint on the merits without hearing because the LPSC has failed to meet its burden of showing any violation of the System Agreement and failed to produce any evidence of imprudent action by the Entergy System.  In their response, the Utility operating companies explained that the System Agreement clearly contemplates that the Utility operating companies may make sales to third parties for their own account, subject to the requirement that those sales be included in the load (or load shape) for the applicable Utility operating company.  The FERC subsequently ordered a hearing in the proceeding.

The LPSC filed direct testimony in the proceeding alleging, among other things, (1) that Entergy violated the System Agreement by permitting Entergy Arkansas to make non-requirements sales to non-affiliated third parties rather than making such energy available to the other Utility operating companies’ customers; and (2) that over the period 2000 - 2009, these non-requirements sales caused harm to the Utility operating companies’ customers and these customers should be compensated for this harm by Entergy.  In subsequent testimony, the LPSC modified its original damages claim in favor of quantifying damages by re-running intra-system bills.  The Utility operating companies believe the LPSC’s allegations are without merit.  A hearing in the matter was held in August 2010.

In December 2010 the ALJ issued an initial decision.  The ALJ found that the System Agreement allowed for Entergy Arkansas to make the sales to third parties but concluded that the sales should be accounted for in the same manner as joint account sales.  The ALJ concluded that “shareholders” should make refunds of the damages to the Utility operating companies, along with interest.  Entergy disagreed with several aspects of the ALJ’s initial decision and in January 2011 filed with the FERC exceptions to the decision.

The FERC issued a decision in June 2012 and held that, while the System Agreement is ambiguous, it does provide authority for individual Utility operating companies to make opportunity sales for their own account and Entergy Arkansas made and priced these sales in good faith.  The FERC found, however, that the System Agreement does not provide authority for an individual Utility operating company to allocate the energy associated with such opportunity sales as part of its load, but provides a different allocation authority.  The FERC further found that the after-the-fact accounting methodology used to allocate the energy used to supply the sales was inconsistent with the System Agreement.  Quantifying the effect of the FERC’s decision requires re-running intra-system bills for a ten-year period, and the FERC in its decision established further hearing procedures to determine the calculation of the effects.  In July 2012, Entergy and the LPSC filed requests for rehearing of the FERC’s June 2012 decision. A hearing was held in May 2013 to quantify the effect of repricing the opportunity sales in accordance with the FERC’s June 2012 decision.

In August 2013 the presiding judge issued an initial decision in the calculation proceeding. The initial decision concluded that the methodology proposed by the LPSC, rather than the methodologies proposed by Entergy or the FERC Staff, should be used to calculate the payments that Entergy Arkansas is to make to the other Utility operating companies. The initial decision also concluded that the other System Agreement service schedules should not be adjusted and that payments by Entergy Arkansas should not be reflected in the rough production cost equalization bandwidth calculations for the applicable years. The initial decision recognized that the LPSC’s methodology would result in an inequitable windfall to the other Utility operating companies and, therefore, concluded that any payments by Entergy Arkansas should be reduced by 20%. The LPSC, the APSC, the City Council, and FERC staff filed briefs on exceptions and/or briefs opposing exceptions. Entergy filed a brief on exceptions requesting that the FERC reverse the initial decision and a brief opposing certain exceptions taken by the LPSC and FERC staff.

In April 2016 the FERC issued orders addressing requests for rehearing filed in July 2012 and the ALJ’s August 2013 initial decision. The first order denied Entergy’s request for rehearing and affirmed the FERC’s earlier rulings that Entergy’s original methodology for allocating energy costs to the opportunity sales was incorrect and, as a result, Entergy Arkansas must make payments to the other Utility operating companies to put them in the same position that they would have been in absent the incorrect allocation. The FERC clarified that interest should be included with the payments. The second order affirmed in part, and reversed in part, the rulings in the ALJ’s August 2013 initial decision regarding the methodology that should be used to calculate the payments Entergy Arkansas is to make to the other Utility operating companies. The FERC affirmed the ALJ’s ruling that a full re-run of intra-system bills should be performed, but required that methodology be modified so that the sales have the same priority for purposes of energy allocation as joint account sales. The FERC reversed the ALJ’s decision that any payments by Entergy Arkansas should be reduced by 20%. The FERC also reversed the ALJ’s decision that adjustments to other System Agreement service schedules and excess bandwidth payments should not be taken into account when calculating the payments to be made by Entergy Arkansas. The FERC held that such adjustments and excess bandwidth payments should be taken into account, but ordered further proceedings before an ALJ to address whether a cap on any reduction due to bandwidth payments was necessary and to implement the other adjustments to the calculation methodology.

In May 2016, Entergy Services filed a request for rehearing of the FERC’s April 2016 order arguing that payments made by Entergy Arkansas should be reduced as a result of the timing of the LPSC’s approval of certain contracts. Entergy Services also filed a request for clarification and/or rehearing of the FERC’s April 2016 order addressing the ALJ’s August 2013 initial decision. The APSC and the LPSC also filed requests for rehearing of the FERC’s April 2016 order. In September 2017 the FERC issued an order denying the request for rehearing on the issue of whether any payments by Entergy Arkansas to the other Utility operating companies should be reduced due to the timing of the LPSC’s approval of Entergy Arkansas’s wholesale baseload contract with Entergy Louisiana. In November 2017 the FERC issued an order denying all of the remaining requests for rehearing of the April 2016 order. In November 2017, Entergy Services filed a petition for review in the D.C. Circuit of the FERC’s orders in the first two phases of the opportunity sales case. In December 2017 the D.C. Circuit granted Entergy Services’s request to hold the appeal in abeyance pending final resolution of the related proceeding still pending with the FERC. In January 2018 the APSC and the LPSC filed separate petitions for review in the D.C. Circuit, and the D.C. Circuit consolidated the appeals with Entergy Services’s appeal and held all of the appeals in abeyance.

Pursuant to the procedural schedule established in the case, Entergy Services re-ran intra-system bills for the ten-year period 2000-2009 to quantify the effects of the FERC's ruling. In November 2016 the LPSC submitted testimony disputing certain aspects of the calculations. A hearing was held in May 2017. In July 2017, the ALJ issued an initial decision concluding that Entergy Arkansas should pay $86 million plus interest to the other Utility operating companies. In August 2017 the Utility operating companies, the LPSC, the APSC, and FERC staff filed individual briefs on exceptions challenging various aspects of the initial decision. In September 2017 the Utility operating companies, the LPSC, the APSC, the MPSC, the City Council, and FERC staff filed separate briefs opposing exceptions taken by various parties. The case is pending before the FERC. No payments will be made or received by the Utility operating companies until the FERC issues an order reviewing the initial decision and Entergy submits a subsequent filing to comply with that order.

The effect of the FERC’s decisions thus far in the case would be that Entergy Arkansas will make payments to some or all of the other Utility operating companies. Because further proceedings will still occur in the case, the amount and recipients of payments by Entergy Arkansas are unknown at this time. Based on testimony previously submitted in the case and its assessment of the April 2016 FERC orders, in the first quarter 2016, Entergy Arkansas recorded a liability of $87 million, which includes interest, for its estimated increased costs and payment to the other Utility operating companies. This estimate is subject to change depending on how the FERC resolves the issues that are still outstanding in the case, including its review of the July 2017 initial decision. Entergy Arkansas’s increased costs will be attributed to Entergy Arkansas’s retail and wholesale businesses, and it is not probable that Entergy Arkansas will recover the wholesale portion. Entergy Arkansas, therefore, recorded a deferred fuel regulatory asset in the first quarter 2016 of approximately $75 million, which represents its estimate of the retail portion of the costs. Following its assessment of the course of the proceedings, including the FERC’s denial of rehearing in November 2017 described above, in the fourth quarter 2017, Entergy Arkansas recorded an additional liability of $35 million and a regulatory asset of $31 million. Because management currently expects to recover the retail portion of the costs through a base rate proceeding or newly proposed rider, the regulatory asset is reflected as Other regulatory assets as of December 31, 2017.
    
Complaint Against System Energy

In January 2017 the APSC and MPSC filed a complaint with the FERC against System Energy. The complaint seeks a reduction in the return on equity component of the Unit Power Sales Agreement pursuant to which System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. Entergy Arkansas also sells some of its Grand Gulf capacity and energy to Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under separate agreements. The current return on equity under the Unit Power Sales Agreement is 10.94%. The complaint alleges that the return on equity is unjust and unreasonable because current capital market and other considerations indicate that it is excessive. The complaint requests the FERC to institute proceedings to investigate the return on equity and establish a lower return on equity, and also requests that the FERC establish January 23, 2017 as a refund effective date. The complaint includes return on equity analysis that purports to establish that the range of reasonable return on equity for System Energy is between 8.37% and 8.67%. System Energy answered the complaint in February 2017 and disputes that a return on equity of 8.37% to 8.67% is just and reasonable. The LPSC and the City Council intervened in the proceeding expressing support for the complaint. System Energy is recording a provision against revenue for the potential outcome of this proceeding. In September 2017 the FERC established a refund effective date of January 23, 2017, consolidated the return on equity complaint with the proceeding described in Unit Power Sales Agreement below, and directed the parties to engage in settlement proceedings before an ALJ. If the parties fail to come to an agreement during settlement proceedings, a prehearing conference will be held to establish a procedural schedule for hearing proceedings.

Unit Power Sales Agreement

In August 2017, System Energy submitted to the FERC proposed amendments to the Unit Power Sales Agreement pursuant to which System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. The filing proposes limited amendments to the Unit Power Sales Agreement to adopt (1) updated rates for use in calculating Grand Gulf plant depreciation and amortization expenses and (2) updated nuclear decommissioning cost annual revenue requirements, both of which are recovered through the Unit Power Sales Agreement rate formula. The proposed amendments would result in lower charges to the Utility operating companies that buy capacity and energy from System Energy under the Unit Power Sales Agreement. The proposed changes are based on updated depreciation and nuclear decommissioning studies that take into account the renewal of Grand Gulf’s operating license for a term through November 1, 2044. System Energy requested that the FERC accept the amendments effective October 1, 2017.

In September 2017 the FERC accepted System Energy’s proposed Unit Power Sales Agreement amendments, subject to further proceedings to consider the justness and reasonableness of the amendments. Because the amendments propose a rate decrease, the FERC also initiated an investigation under Section 206 of the Federal Power Act to determine if the rate decrease should be lower than proposed. The FERC accepted the proposed amendments effective October 1, 2017, subject to refund pending the outcome of the further settlement and/or hearing proceedings, and established a refund effective date of October 11, 2017 with respect to the rate decrease. The FERC also consolidated the Unit Power Sales Agreement amendment proceeding with the proceeding described in Complaint Against System Energy above, and directed the parties to engage in settlement proceedings before an ALJ. If the parties fail to come to an agreement during settlement proceedings, a prehearing conference will be held to establish a procedural schedule for hearing proceedings.

Storm Cost Recovery Filings with Retail Regulators

Entergy Louisiana

Hurricane Isaac

In August 2012, Hurricane Isaac caused extensive damage to Entergy Louisiana’s service area.  The storm resulted in widespread power outages, significant damage primarily to distribution infrastructure, and the loss of sales during the power outages.  In June 2014 the LPSC authorized Entergy Louisiana to utilize Louisiana Act 55 financing for Hurricane Isaac system restoration costs.  Entergy Louisiana committed to pass on to customers a minimum of $30.8 million of customer benefits through annual customer credits of approximately $6.2 million for five years. Approvals for the Act 55 financings were obtained from the Louisiana Utilities Restoration Corporation (LURC) and the Louisiana State Bond Commission.

In August 2014 the Louisiana Local Government Environmental Facilities and Community Development Authority (LCDA) issued $314.85 million in bonds under Louisiana Act 55.  From the $309 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $16 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $293 million directly to Entergy Louisiana.  Entergy Louisiana used the $293 million received from the LURC to acquire 2,935,152.69 Class C preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 7.5% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2014, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement. The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1.75 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC, and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

Hurricane Gustav and Hurricane Ike

In September 2008, Hurricane Gustav and Hurricane Ike caused catastrophic damage to Entergy Louisiana’s service territory.  In December 2009, Entergy Louisiana entered into a stipulation agreement with the LPSC staff regarding its storm costs.  In March and April 2010, Entergy Louisiana and other parties to the proceeding filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal to utilize Act 55 financing, which included a commitment to pass on to customers a minimum of $43.3 million of customer benefits through a prospective annual rate reduction of $8.7 million for five years.  In April 2010 the LPSC approved the settlement and subsequently issued financing orders and a ratemaking order intended to facilitate the implementation of the Act 55 financings.  In June 2010 the Louisiana State Bond Commission approved the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricane Gustav and Hurricane Ike was reduced by $2.7 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2010, the LCDA issued two series of bonds totaling $713.0 million under Act 55.  From the $702.7 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $290 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $412.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana used $412.7 million to acquire 4,126,940.15 Class B preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 9% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2010, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA, and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC, and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.
Hurricane Katrina and Hurricane Rita

In August and September 2005, Hurricanes Katrina and Rita caused catastrophic damage to Entergy Louisiana’s service territory. In March 2008, Entergy Louisiana and the LURC filed at the LPSC an application requesting that the LPSC grant a financing order authorizing the financing of Entergy Louisiana storm costs, storm reserves, and issuance costs pursuant to Louisiana Act 55.  The Louisiana Act 55 financing is expected to produce additional customer benefits as compared to traditional securitization.  Entergy Louisiana also filed an application requesting LPSC approval for ancillary issues including the mechanism to flow charges and savings to customers via a storm cost offset rider.  In April 2008 the Louisiana Public Facilities Authority (LPFA), which is the issuer of the bonds pursuant to the Act 55 financing, approved requests for the Act 55 financing.  Also in April 2008, Entergy Louisiana and the LPSC staff filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal under the Act 55 financing, which included a commitment to pass on to customers a minimum of $40 million of customer benefits through a prospective annual rate reduction of $8 million for five years.  The LPSC subsequently approved the settlement and issued two financing orders and one ratemaking order intended to facilitate implementation of the Act 55 financing.  In May 2008 the Louisiana State Bond Commission granted final approval of the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricanes Katrina and Rita was reduced by $22.3 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2008 the LPFA issued $687.7 million in bonds under the aforementioned Act 55.  From the $679 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $152 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $527 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $545 million, including $17.8 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 5,449,861.85 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 10% annual distribution rate.  In August 2008, the LPFA issued $278.4 million in bonds under the aforementioned Act 55.  From the $274.7 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $87 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $187.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $189.4 million, including $1.7 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 1,893,918.39 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC that carry a 10% annual distribution rate.  Distributions are payable quarterly commencing on September 15, 2008 and have a liquidation price of $100 per unit.  The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.  In February 2012, Entergy Louisiana sold 500,000 of its Class A preferred membership units in Entergy Holdings Company LLC, a wholly-owned Entergy subsidiary, to a third party in exchange for $51 million plus accrued but unpaid distributions on the units.  The 500,000 preferred membership units are mandatorily redeemable in January 2112.

Entergy and Entergy Louisiana do not report the bonds issued by the LPFA on their balance sheets because the bonds are the obligation of the LPFA, and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC, and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

Entergy Mississippi

Entergy Mississippi has approval from the MPSC to collect a storm damage provision of $1.75 million per month. If Entergy Mississippi’s accumulated storm damage provision balance exceeds $15 million, the collection of the storm damage provision ceases until such time that the accumulated storm damage provision becomes less than $10 million. As of April 30, 2016, Entergy Mississippi’s storm damage provision balance was less than $10 million, therefore Entergy Mississippi resumed billing the monthly storm damage provision effective with June 2016 bills. As of September 30, 2016, however, Entergy Mississippi’s storm damage provision balance again exceeded $15 million. Accordingly the storm damage provision was reset to zero beginning with November 2016 bills. As of July 31, 2017, the balance in Entergy Mississippi’s accumulated storm damage provision was again less than $10 million, therefore Entergy Mississippi resumed billing the monthly storm damage provision effective with September 2017 bills.

Entergy New Orleans

In August 2012, Hurricane Isaac caused extensive damage to Entergy New Orleans’s service area. In January 2015 the City Council issued a resolution approving the terms of a joint agreement in principle filed by Entergy New Orleans, Entergy Louisiana, and the City Council Advisors determining, among other things, that Entergy New Orleans’s prudently-incurred storm recovery costs were $49.3 million, of which $31.7 million, net of reimbursements from the storm reserve escrow account, remained recoverable from Entergy New Orleans’s electric customers. The resolution also directed Entergy New Orleans to file an application to securitize the unrecovered City Council-approved storm recovery costs of $31.7 million pursuant to the Louisiana Electric Utility Storm Recovery Securitization Act (Louisiana Act 64). In addition, the resolution found that it was reasonable for Entergy New Orleans to include in the principal amount of its potential securitization the costs to fund and replenish Entergy New Orleans’s storm reserve in an amount that achieved the City Council-approved funding level of $75 million. In January 2015, in compliance with that directive, Entergy New Orleans filed with the City Council an application requesting that the City Council grant a financing order authorizing the financing of Entergy New Orleans’s storm costs, storm reserves, and issuance costs pursuant to Louisiana Act 64. In May 2015 the parties entered into an agreement in principle and the City Council issued a financing order authorizing Entergy New Orleans to issue storm recovery bonds in the aggregate amount of $98.7 million, including $31.8 million for recovery of Entergy New Orleans’s Hurricane Isaac storm recovery costs, including carrying costs, $63.9 million to fund and replenish Entergy New Orleans’s storm reserve, and approximately $3 million for estimated up-front financing costs associated with the securitization. See Note 5 to the financial statements for discussion of the issuance of the securitization bonds in July 2015.

New Nuclear Generation Development Costs

Entergy Louisiana

Entergy Louisiana and Entergy Gulf States Louisiana were developing a project option for new nuclear generation at River Bend.  In March 2010, Entergy Louisiana and Entergy Gulf States Louisiana filed with the LPSC seeking approval to continue the limited development activities necessary to preserve an option to construct a new unit at River Bend.  At its June 2012 meeting the LPSC voted to uphold an ALJ recommendation that the request of Entergy Louisiana and Entergy Gulf States Louisiana be declined on the basis that the LPSC’s rule on new nuclear development does not apply to activities to preserve an option to develop and on the further grounds that the companies improperly engaged in advanced preparation activities prior to certification.  The LPSC directed that Entergy Louisiana and Entergy Gulf States Louisiana be permitted to seek recovery of these costs in their upcoming rate case filings that were subsequently filed in February 2013. In the resolution of the rate case proceeding the LPSC provided for an eight-year amortization of costs incurred in connection with the potential development of new nuclear generation at River Bend, without carrying costs, beginning in December 2014, provided, however, that amortization of these costs shall not result in a future rate increase. As of December 31, 2017, Entergy Louisiana has a regulatory asset of $35.8 million on its balance sheet related to these new nuclear generation development costs.
Entergy Texas [Member]  
Rate And Regulatory Matters
RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)
 
Regulatory Assets and Regulatory Liabilities

Regulatory assets represent probable future revenues associated with costs that Entergy expects to recover from customers through the regulatory ratemaking process under which the Utility business operates. Regulatory liabilities represent probable future reductions in revenues associated with amounts that Entergy expects to benefit customers through the regulatory ratemaking process under which the Utility business operates. In addition to the regulatory assets and liabilities that are specifically disclosed on the face of the balance sheets, the tables below provide detail of “Other regulatory assets” and “Other regulatory liabilities” that are included on Entergy’s and the Registrant Subsidiaries’ balance sheets as of December 31, 2017 and 2016:
 
Other Regulatory Assets

Entergy
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$2,642.3

 

$2,635.5

Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
746.0

 
677.2

Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 2 – Storm Cost Recovery Filings with Retail Regulators) (Note 5)
558.9

 
637.0

Removal costs - recovered through depreciation rates (Note 9) (a)
436.5

 
353.9

Opportunity Sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding)
109.8

 

Retail rate deferrals - recovered through rate riders as rates are redetermined by retail regulators
86.4

 
22.1

Unamortized loss on reacquired debt - recovered over term of debt
82.9

 
91.4

Little Gypsy costs – recovered through securitization (Note 5 – Entergy Louisiana Securitization Bonds - Little Gypsy)
73.7

 
100.0

Transition to competition costs - recovered over a 15-year period through February 2021
37.7

 
47.9

New nuclear generation development costs (Note 2 - New Nuclear Generation Development Costs) (b)
36.4

 
43.7

Other
125.1

 
161.2

Entergy Total

$4,935.7

 

$4,769.9



Entergy Arkansas
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$757.0

 

$786.6

Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
345.2

 
322.9

Removal costs - recovered through depreciation rates (Note 9) (a)
176.9

 
128.5

Opportunity sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding)
109.8

 

Storm damage costs - recovered either through securitization or retail rates (Note 5 - Entergy Arkansas Securitization Bonds)
76.2

 
88.9

Retail rate deferrals - recovered through rate riders as rates are redetermined annually
28.2

 
10.1

Unamortized loss on reacquired debt - recovered over term of debt
24.3

 
27.6

ANO Fukushima and Flood Barrier costs - recovered through retail rates through February 2026 (Note 2 - Retail Rate Proceedings) (b)
14.4

 
16.1

Lake Catherine 4 reliability and sustainability cost deferral - recovery through retail rates (b)
8.9

 
9.8

Incremental ice storm costs - recovered through 2032
7.4

 
7.9

MISO costs - recovery through retail rates through 2018 (Note 2 - Retail Rate Proceedings) (b)
5.5

 
11.1

Human capital management costs - recovery through retail rates through August 2019 (Note 2 - Retail Rate Proceedings) (b)
4.4

 
7.0

Other
9.2

 
11.5

Entergy Arkansas Total

$1,567.4

 

$1,428.0



Entergy Louisiana
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans and Non-Qualified Pension Plans) (a)

$724.6

 

$715.7

Asset Retirement Obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
218.6

 
199.4

Little Gypsy costs – recovered through securitization (Note 5 – Entergy Louisiana Securitization Bonds - Little Gypsy)
71.4

 
97.8

New nuclear generation development costs - recovery through formula rate plan beginning December 2014 through November 2022 (Note 2 - New Nuclear Generation Development Costs) (b)
35.8

 
43.1

Unamortized loss on reacquired debt - recovered over term of debt
24.7

 
27.0

Storm damage costs - recovered through retail rates (Note 2 - Storm Cost Recovery Filings with Retail Regulators)
14.3

 

Business combination external costs deferral - recovery through formula rate plan beginning December 2015 through November 2025 (b)
14.1

 
15.2

River Bend AFUDC - recovered through August 2025 (Note 1 – River Bend AFUDC)
12.9

 
14.8

Other
29.4

 
55.1

Entergy Louisiana Total

$1,145.8

 

$1,168.1



Entergy Mississippi
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$218.7

 

$217.2

Removal costs - recovered through depreciation rates (Note 9) (a)
91.6

 
82.0

Retail rate deferrals - recovered through rate riders as rates are redetermined annually
49.4

 
9.3

Unamortized loss on reacquired debt - recovered over term of debt
17.6

 
18.9

Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
7.6

 
7.2

Other
13.0

 
7.6

Entergy Mississippi Total

$397.9

 

$342.2



Entergy New Orleans
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$102.8

 

$108.8

Storm damage costs, including hurricane costs - recovered through retail rates and securitization (Note 2 - Storm Cost Recovery Filings with Retail Regulators)
82.3

 
93.6

Removal costs - recovered through depreciation rates (Note 9) (a)
44.8

 
40.1

Retail rate deferrals - recovered through rate riders as rates are redetermined monthly or annually
4.4

 
4.3

Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
4.3

 
4.2

Unamortized loss on reacquired debt - recovered over term of debt
3.0

 
3.4

Rate case costs - recovered over a 6-year period through September 2021 (Note 2 - Retail Rate Proceedings)
2.6

 
3.0

Michoud plant maintenance – recovered over a 7-year period through September 2018
1.4

 
3.3

Other
5.8

 
7.4

Entergy New Orleans Total

$251.4

 

$268.1



Entergy Texas
 
2017
 
2016
 
(In Millions)
Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 5 - Entergy Texas Securitization Bonds)

$386.1

 

$442.4

Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
169.2

 
201.7

Transition to competition costs - recovered over a 15-year period through February 2021
37.7

 
47.9

Removal costs - recovered through depreciation rates (Note 9) (a)
55.2

 
33.5

Unamortized loss on reacquired debt - recovered over term of debt
8.7

 
9.0

Other
4.5

 
5.7

Entergy Texas Total

$661.4

 

$740.2



System Energy
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans and Other Postretirement Benefits) (a)

$202.7

 

$193.5

Asset retirement obligation - recovery dependent upon timing of decommissioning (Note 9) (a)
169.1

 
142.5

Removal costs - recovered through depreciation rates (Note 9) (a)
67.9

 
69.7

Unamortized loss on reacquired debt - recovered over term of debt
4.6

 
5.5

System Energy Total

$444.3

 

$411.2



(a)
Does not earn a return on investment, but is offset by related liabilities.
(b)
Does not earn a return on investment.
Other Regulatory Liabilities

Entergy
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)

$989.3

 

$735.5

Vidalia purchased power agreement (Note 8) (b)
151.6

 
202.4

Louisiana Act 55 financing savings obligation (Note 2 - Storm Cost Recovery Filings with Retail Regulators) (b)
124.8

 
165.5

Grand Gulf sale-leaseback - (Note 10 - Sale and Leaseback Transactions)
67.9

 
67.9

Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates beginning December 2015 through November 2024 (Note 2 - Entergy Louisiana and Entergy Gulf States Louisiana Business Combination)
65.8

 
83.5

Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4

 
44.4

Asset retirement obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
36.7

 
32.7

Removal costs - returned to customers through depreciation rates (Note 9) (a)
32.4

 
53.9

Entergy Mississippis accumulated accelerated Grand Gulf amortization - amortized and credited through the Unit Power Sales Agreement
32.1

 
39.3

Waterford 3 replacement steam generator provision (Note 2 - Retail Rate Proceedings)

 
68.0

Other
43.5

 
79.8

Entergy Total

$1,588.5

 

$1,572.9


Entergy Arkansas
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)

$354.0

 

$280.8

Other
9.6

 
25.1

Entergy Arkansas Total

$363.6

 

$305.9



Entergy Louisiana
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)

$323.7

 

$235.4

Vidalia purchased power agreement (Note 8) (b)
151.6

 
202.4

Louisiana Act 55 financing savings obligation (Note 2 - Storm Cost Recovery Filings with Retail Regulators) (b)
124.8

 
165.5

Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates beginning December 2015 through November 2024 (Note 2 - Entergy Louisiana and Entergy Gulf States Louisiana Business Combination)
65.8

 
83.5

Gas hedging costs - refunded through fuel rates (Note 15 - Derivatives)

 
10.9

Asset Retirement Obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
36.7

 
32.7

Removal costs - returned to customers through depreciation rates (Note 9) (a)
32.4

 
53.9

Waterford 3 replacement steam generator provision (Note 2 - Retail Rate Proceedings)

 
68.0

Other
26.1

 
28.7

Entergy Louisiana Total

$761.1

 

$881.0



Entergy Texas
 
2017
 
2016
 
(In Millions)
Transition to competition costs - returned to customers through rate riders when rates are redetermined periodically

$4.8

 

$6.2

Other
2.1

 
2.3

Entergy Texas Total

$6.9

 

$8.5


System Energy
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 17) (a)

$311.6

 

$219.3

Grand Gulf sale-leaseback - (Note 10 - Sale and Leaseback Transactions)
67.9

 
67.9

Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4

 
44.4

Entergy Mississippis accumulated accelerated Grand Gulf amortization - amortized and credited through the Unit Power Sales Agreement
32.1

 
39.3

System Energy Total

$456.0

 

$370.9



(a)
Offset by related asset.
(b)
As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21% effective January 2018, the Vidalia purchased power agreement regulatory liability was reduced by $30.5 million and the Louisiana Act 55 financing savings obligation regulatory liabilities were reduced by $25.0 million, with corresponding increases to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

Regulatory activity regarding the Tax Cuts and Jobs Act

See the “Other Tax Matters - Tax Cuts and Jobs Act” section in Note 3 to the financial statements for discussion of the effects of the enactment of the Tax Cuts and Jobs Act, in December 2017, including its effects on Entergy’s and the Registrant Subsidiaries’ regulatory asset/liability for income taxes.

After enactment of the Tax Cuts and Jobs Act the APSC issued an order that applies to investor-owned utilities in Arkansas, including Entergy Arkansas. The order requests information regarding certain effects of the Tax Cuts and Jobs Act and requires the utilities to begin, effective January 1, 2018, to record regulatory liabilities to record the effects of the Act, subject to review by the APSC, although the order acknowledges that the exact amount of tax savings and rate reductions cannot be determined at this time. Entergy Arkansas requested clarification or, in the alternative, rehearing regarding the requirement to record a regulatory liability, and also responded to the request for information. In its request for clarification Entergy Arkansas sought clarification that the amount of any regulatory liability would be determined only after the utilities are heard and present evidence on the issue, as this otherwise would be arbitrary and could implicate single-issue and retroactive ratemaking. The APSC has not responded to the request for clarification. In its response to the APSC’s request for information Entergy Arkansas states that its formula rate plan rider already provides the means for customers to realize the benefits of the Act, except for the return of unprotected excess accumulated deferred income taxes. Entergy Arkansas’s next formula rate plan filing is scheduled for July 2018. Entergy Arkansas intends to return unprotected excess accumulated deferred income taxes as expeditiously as possible, subject to a subsequent request to be made by Entergy Arkansas and approval by the APSC.

After enactment of the Tax Cuts and Jobs Act the LPSC passed an agenda item requiring utilities, including Entergy Louisiana, to file reports regarding certain effects of the Act. Entergy Louisiana responded to the directive and stated in its response that it is working with the LPSC staff and other interested parties to extend its formula rate plan such that its next base rate change will occur effective September 2018, or it would file a base rate case. Entergy Louisiana went on to state that if the formula rate plan is extended Entergy Louisiana’s next adjustment of rates will reflect the new 21% federal corporate income tax rate. Entergy Louisiana stated that it is working with the LPSC staff and interested parties to determine when the tax rate reduction will be reflected in rates, along with when and how the excess accumulated deferred income taxes will be reflected in rates, and how certain tax sharing agreement customer credits will be adjusted. On February 21, 2018, the LPSC issued a special order requiring that all LPSC-jurisdictional utilities, beginning as of January 1, 2018, record as a regulatory liability (deferred liability) the amount required to reflect the reduction in the federal corporate income tax rate from 35% to 21% and the associated savings in excess accumulated deferred income taxes until such time as its rates are changed by the LPSC to reflect these federal tax savings. In the same special order, the LPSC also initiated a new rulemaking docket to consider these issues and the appropriate manner in which to flow through the benefits to Louisiana customers and to provide an opportunity for discovery and comments of jurisdictional utilities and other interested stakeholders. The rulemaking further requires the LPSC staff to report back to the LPSC as soon as practicable and preferably by the March 21, 2018, LPSC Business and Executive Session with recommendations as to how the federal tax-related benefits will be flowed through to Louisiana customers.

After enactment of the Tax Cuts and Jobs Act the MPSC ordered utilities, including Entergy Mississippi, that operate under a formula rate plan to file a description by February 26, 2018, of how the Act will be reflected in the formula rate plan under which the utility operates. In addition to the description that is due February 26, 2018, Entergy Mississippi’s formula rate plan 2018 test year filing is scheduled to be filed by March 15, 2018.

After enactment of the Tax Cuts and Jobs Act the City Council passed a resolution ordering Entergy New Orleans to, effective January 1, 2018, record deferred regulatory liabilities to account for the Act’s effect on Entergy New Orleans’s revenue requirement and to make a filing by mid-March 2018 regarding the Act’s effects on Entergy New Orleans’s operating income and rate base and potential mechanisms for customers to receive benefits of the Act. The resolution also directed Entergy New Orleans to request that Entergy Services file with the FERC for revisions of the Unit Power Sales Agreement and MSS-4 replacement tariffs to address the return of excess accumulated deferred income taxes. Entergy plans to make such filings with the FERC by the end of March 2018.
After enactment of the Tax Cuts and Jobs Act the PUCT issued an order requiring most utilities, including Entergy Texas, beginning January 25, 2018, to record a regulatory liability for the difference between revenues collected under existing rates and revenues that would have been collected had existing rates been set using the new federal income tax rates and also for the balance of excess accumulated deferred income taxes. The order also directs the PUCT staff to investigate each investor-owned utility on a case-by-case basis to determine the appropriate mechanism to adjust its rates to reflect the changes under the Act. In both a memorandum issued prior to the open meeting when the order was discussed and during the discussions at the open meeting discussing the order, the PUCT indicated that it would consider utility earnings in determining the treatment of the liability and the effects of the Act. Entergy Texas had previously provided information to the PUCT Staff in the docket and stated that it expects the PUCT to address the lower tax expense as part of Entergy Texas’s rate case expected to be filed in May 2018. Entergy Texas also stated that it would be inappropriate for the PUCT to require a refund of the reduction in income tax expense in 2018 resulting from the Act on a retroactive basis and without a comprehensive review of Entergy Texas’s cost of service and earned return on equity. In a subsequent order issued following the February 2018 open meeting, the PUCT clarified that carrying costs need not be recorded as part of the regulatory liability.

The Registrant Subsidiaries will continue to work with their respective regulators to determine the appropriate path forward in each jurisdiction regarding the effects of the Act.

Fuel and purchased power cost recovery

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas are allowed to recover fuel and purchased power costs through fuel mechanisms included in electric and gas rates that are recorded as fuel cost recovery revenues.  The difference between revenues collected and the current fuel and purchased power costs is generally recorded as “Deferred fuel costs” on the Utility operating companies’ financial statements.  The table below shows the amount of deferred fuel costs as of December 31, 2017 and 2016 that Entergy expects to recover (or return to customers) through fuel mechanisms, subject to subsequent regulatory review.
 
2017
 
2016
 
(In Millions)
Entergy Arkansas (a)

$130.4

 

$163.6

Entergy Louisiana (b)

$96.7

 

$119.9

Entergy Mississippi

$32.4

 

$7.0

Entergy New Orleans (b)

($3.7
)
 

$8.9

Entergy Texas

($67.3
)
 

($54.5
)

(a)
Includes $67.1 million in 2017 and $66.9 million in 2016 of fuel and purchased power costs, which do not currently earn a return on investment and whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.
(b)
Includes $168.1 million in each year for Entergy Louisiana and $4.1 million in each year for Entergy New Orleans of fuel, purchased power, and capacity costs, which do not currently earn a return on investment and whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.

Entergy Arkansas

Production Cost Allocation Rider

The APSC approved a production cost allocation rider for recovery from customers of the retail portion of the costs allocated to Entergy Arkansas as a result of the System Agreement proceedings, which are discussed in the “System Agreement Cost Equalization Proceedings” section below.  These costs cause an increase in Entergy Arkansas’s deferred fuel cost balance because Entergy Arkansas pays the costs over seven months but collects the costs from customers over twelve months.

In May 2014, Entergy Arkansas filed its annual redetermination of the production cost allocation rider to recover the $3 million unrecovered retail balance as of December 31, 2013 and the $67.8 million System Agreement bandwidth remedy payment made in May 2014 as a result of the compliance filing pursuant to the FERC’s February 2014 orders related to the bandwidth payments/receipts for the June - December 2005 period. In January 2015 the APSC issued an order approving Entergy Arkansas’s request for recovery of the $3 million under-recovered amount based on the true-up of the production cost allocation rider and the $67.8 million May 2014 System Agreement bandwidth remedy payment subject to refund with interest, with recovery of these payments concluding with the last billing cycle in December 2015. The APSC also found that Entergy Arkansas is entitled to carrying charges pursuant to the current terms of the production cost allocation rider. Entergy Arkansas made its compliance filing pursuant to the order in January 2015 and the APSC issued its approval order, also in January 2015. The redetermined rate went into effect with the first billing cycle of February 2015.

In May 2015, Entergy Arkansas filed its annual redetermination of the production cost allocation rider, which included a $38 million payment made by Entergy Arkansas as a result of the FERC’s February 2014 order related to the comprehensive bandwidth recalculation for calendar year 2006, 2007, and 2008 production costs. The redetermined rate for the 2015 production cost allocation rider update was added to the redetermined rate from the 2014 production cost allocation rider update and the combined rate was effective with the first billing cycle of July 2015. This combined rate was effective through December 2015. The collection of the remainder of the redetermined rate for the 2015 production cost allocation rider update continued through June 2016.

In May 2016, Entergy Arkansas filed its annual redetermination pursuant to the production cost allocation rider, which reflected recovery of the production cost allocation rider true-up adjustment of the 2014 and 2015 unrecovered retail balance in the amount of $1.9 million. Additionally, the redetermined rates reflected the recovery of a $1.9 million System Agreement bandwidth remedy payment resulting from a compliance filing pursuant to the FERC’s December 2015 order related to test year 2009 production costs. The rates for the 2016 production cost allocation rider update became effective with the first billing cycle of July 2016, and the rates were effective through June 2017.

In May 2017, Entergy Arkansas filed its annual redetermination pursuant to the production cost allocation rider, which reflected a credit amount of $0.3 million resulting from a compliance filing pursuant to the FERC’s September 2016 order. Additionally, the redetermined rate reflected recovery of the production cost allocation rider true-up adjustment of the 2016 unrecovered retail balance in the amount of $0.3 million. Because of the small effect of the 2017 production cost allocation rider update, Entergy Arkansas proposed to reduce the effective period of the update to one month, July 2017. After the one month collection period, rates were set to zero for all rate classes for the period August 2017 through June 2018.

Energy Cost Recovery Rider

Entergy Arkansas’s retail rates include an energy cost recovery rider to recover fuel and purchased energy costs in monthly customer bills.  The rider utilizes the prior calendar-year energy costs and projected energy sales for the twelve-month period commencing on April 1 of each year to develop an energy cost rate, which is redetermined annually and includes a true-up adjustment reflecting the over- or under-recovery, including carrying charges, of the energy costs for the prior calendar year.  The energy cost recovery rider tariff also allows an interim rate request depending upon the level of over- or under-recovery of fuel and purchased energy costs.

In January 2014, Entergy Arkansas filed a motion with the APSC relating to its redetermination of its energy cost rate that was subsequently filed in March 2014. In that motion, Entergy Arkansas requested that the APSC authorize Entergy Arkansas to exclude $65.9 million of deferred fuel and purchased energy costs incurred in 2013 from the redetermination of its 2014 energy cost rate. The $65.9 million is an estimate of the incremental fuel and replacement energy costs that Entergy Arkansas incurred as a result of the ANO stator incident. Entergy Arkansas requested that the APSC authorize Entergy Arkansas to retain that amount in its deferred fuel balance, with recovery to be reviewed in a later period after more information is available regarding various claims associated with the ANO stator incident. The APSC approved Entergy Arkansas’s request in February 2014. In July 2017, Entergy Arkansas filed for a change in rates pursuant to its formula rate plan rider. In that docket, the APSC approved a settlement agreement agreed upon by the parties, including a provision that requires Entergy Arkansas to initiate a docket for the purpose of recovering funds currently withheld from rates and related to the stator incident, including the $65.9 million of deferred fuel and purchased energy costs previously noted, subject to certain timelines and conditions set forth in the settlement agreement. See the “ANO Damage, Outage, and NRC Reviews” section in Note 8 to the financial statements for further discussion of the ANO stator incident.

In March 2017, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01164 per kWh to $0.01547 per kWh. The APSC staff filed testimony in March 2017 recommending that the redetermined rate be implemented with the first billing cycle of April 2017 under the normal operation of the tariff. Accordingly, the redetermined rate went into effect on March 31, 2017 pursuant to the tariff. In July 2017 the Arkansas Attorney General requested additional information to support certain of the costs included in Entergy Arkansas’s 2017 energy cost rate redetermination.

Entergy Louisiana

Entergy Louisiana recovers electric fuel and purchased power costs for the billing month based upon the level of such costs incurred two months prior to the billing month. Entergy Louisiana’s purchased gas adjustments include estimates for the billing month adjusted by a surcharge or credit that arises from an annual reconciliation of fuel costs incurred with fuel cost revenues billed to customers, including carrying charges.

In April 2010 the LPSC authorized its staff to initiate an audit of Entergy Louisiana’s fuel adjustment clause filings.  The audit included a review of the reasonableness of charges flowed through the fuel adjustment clause by Entergy Louisiana for the period from 2005 through 2009.  The LPSC staff issued its audit report in January 2013.  The LPSC staff recommended that Entergy Louisiana refund approximately $1.9 million, plus interest, to customers and realign the recovery of approximately $1 million from Entergy Louisiana’s fuel adjustment clause to base rates.  The recommended refund was made by Entergy Louisiana in May 2013 in the form of a credit to customers through its fuel adjustment clause filing. In October 2016 the LPSC staff filed testimony affirming the recommendation in its audit report on the lone remaining issue that nuclear dry fuel storage costs should be realigned to base rates. The parties agreed to remove that remaining issue to a separate docket because the same issue was outstanding in the Entergy Gulf States Louisiana audit for the same time period. In November 2016 the LPSC approved the resolution of this audit and the creation of a new docket for the resolution of the proper method of recovery for nuclear dry fuel storage costs. In December 2016 the LPSC opened a new docket in order to resolve the issue regarding the proper methodology for the recovery of nuclear dry fuel storage costs. In October 2017 the LPSC approved the continued recovery of the nuclear dry fuel storage costs through the fuel adjustment clause, resolving the open issue in the audit.

In December 2011 the LPSC authorized its staff to initiate a proceeding to audit the fuel adjustment clause filings of Entergy Gulf States Louisiana and its affiliates.  The audit included a review of the reasonableness of charges flowed by Entergy Gulf States Louisiana through its fuel adjustment clause for the period 2005 through 2009.  In March 2016 the LPSC staff consultant issued its audit report. In its report, the LPSC staff consultant recommended that Entergy Louisiana refund approximately $8.6 million, plus interest, to customers and realign the recovery of approximately $12.7 million from Entergy Gulf States Louisiana’s fuel adjustment clause to base rates. In September 2016 the LPSC staff filed testimony stating that it was no longer recommending a disallowance of $3.4 million of the $8.6 million discussed above, but otherwise maintained positions from its report. Subsequently, the parties entered into a settlement, which was approved by the LPSC in November 2016. The settlement recognized the dry cask storage recovery method issue, which was addressed in the separate proceeding approved by the LPSC in October 2017, provided for a refund of $5 million, which was made to legacy Entergy Gulf States Louisiana customers in December 2016, and resolved all other issues raised in the audit.
In July 2014 the LPSC authorized its staff to initiate an audit of Entergy Gulf States Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed by Entergy Gulf States Louisiana through its fuel adjustment clause for the period from 2010 through 2013. Discovery commenced in July 2015. No report of audit has been issued.

In July 2014 the LPSC authorized its staff to initiate an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed by Entergy Louisiana through its fuel adjustment clause for the period from 2010 through 2013. Discovery commenced in July 2015. No report of audit has been issued.

In June 2016 the LPSC staff provided notice of audits of Entergy Louisiana’s fuel adjustment clause filings and purchased gas adjustment clause filings. In recognition of the business combination that occurred in 2015, the audit notice was issued to Entergy Louisiana and will also include a review of charges to legacy Entergy Gulf States Louisiana customers prior to the business combination. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s fuel adjustment clause for the period from 2014 through 2015 and charges flowed through Entergy Louisiana’s purchased gas adjustment clause for the period from 2012 through 2015. Discovery commenced in March 2017. No report of audit has been issued.

Due to higher fuel costs for the operating month of January 2018 resulting in part from recent cold weather, higher Henry Hub prices, and an increase in total fuel and purchased power costs, Entergy Louisiana plans to cap the average fuel adjustment charge to be billed in March 2018 at $0.03060 per kWh and to defer billing of all fuel costs in excess of the capped amounts by including such costs in the over- or under-recovery account.

Entergy Mississippi

Entergy Mississippi’s rate schedules include an energy cost recovery rider that is adjusted annually to reflect accumulated over- or under-recoveries.  Entergy Mississippi’s fuel cost recoveries are subject to annual audits conducted pursuant to the authority of the MPSC.

Entergy Mississippi had a deferred fuel over-recovery balance of $58.3 million as of May 31, 2015, along with an under-recovery balance of $12.3 million under the power management rider. Pursuant to those tariffs, in July 2015, Entergy Mississippi filed for interim adjustments under both the energy cost recovery rider and the power management rider to flow through to customers the approximately $46 million net over-recovery over a six-month period. In August 2015, the MPSC approved the interim adjustments effective with September 2015 bills. In November 2015, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included a projected over-recovery balance of $48 million projected through January 31, 2016. In January 2016 the MPSC approved the redetermined annual factor effective February 1, 2016. The MPSC further ordered, however, that due to the significant change in natural gas price forecasts since Entergy Mississippi’s filing in November 2015 Entergy Mississippi should file a revised fuel factor with the MPSC no later than February 1, 2016. Pursuant to that order, Entergy Mississippi submitted a revised fuel factor. Additionally, because Entergy Mississippi’s projected over-recovery balance for the period ending January 31, 2016 was $68 million, in February 2016, Entergy Mississippi filed for another interim adjustment to the energy cost factor effective April 2016 to flow through to customers the projected over-recovery balance over a six-month period. That interim adjustment was approved by the MPSC in February 2016 effective for April 2016 bills.

In November 2016, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an over-recovery of less than $2 million as of September 30, 2016. In January 2017 the MPSC approved the annual factor effective with February 2017 bills. Also in January 2017 the MPSC certified to the Mississippi Legislature the audit reports of its independent auditors for the fuel year ending September 30, 2016. In its order, the MPSC expressly reserved the right to review and determine the recoverability of any and all purchased power expenditures made during fiscal year 2016. The MPSC hired independent auditors to conduct an annual operations audit and a financial audit. The independent auditors issued their audit reports in December 2017. The audit reports included several recommendations for action by Entergy Mississippi but did not recommend any cost disallowances. In January 2018 the MPSC certified the audit reports to the Mississippi Legislature. In November 2017 the Public Utilities Staff separately engaged a consultant to review the outage at the Grand Gulf Nuclear Station that began in 2016. The review is currently in progress.

In November 2017, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an under-recovery of approximately $61.5 million as of September 30, 2017. Entergy Mississippi proposed a two-tiered energy cost factor designed to promote overall rate stability throughout 2018 particularly during the summer months. In January 2018 the MPSC approved the proposed energy cost factors effective for February 2018 bills.

Mississippi Attorney General Complaint

The Mississippi attorney general filed a complaint in state court in December 2008 against Entergy Corporation, Entergy Mississippi, Entergy Services, and Entergy Power alleging, among other things, violations of Mississippi statutes, fraud, and breach of good faith and fair dealing, and requesting an accounting and restitution.  The complaint is wide ranging and relates to tariffs and procedures under which Entergy Mississippi purchases power not generated in Mississippi to meet electricity demand.  Entergy believes the complaint is unfounded.  In December 2008 the defendant Entergy companies removed the Attorney General’s lawsuit to U.S. District Court in Jackson, Mississippi.  The Mississippi attorney general moved to remand the matter to state court.  In August 2012 the District Court issued an opinion denying the Attorney General’s motion for remand, finding that the District Court has subject matter jurisdiction under the Class Action Fairness Act.

The defendant Entergy companies answered the complaint and filed a counterclaim for relief based upon the Mississippi Public Utilities Act and the Federal Power Act.  In May 2009 the defendant Entergy companies filed a motion for judgment on the pleadings asserting grounds of federal preemption, the exclusive jurisdiction of the MPSC, and factual errors in the Attorney General’s complaint.  In September 2012 the District Court heard oral argument on Entergy’s motion for judgment on the pleadings.

In January 2014 the U.S. Supreme Court issued a decision in which it held that cases brought by attorneys general as the sole plaintiff to enforce state laws were not considered “mass actions” under the Class Action Fairness Act, so as to establish federal subject matter jurisdiction. One day later the Attorney General renewed his motion to remand the Entergy case back to state court, citing the U.S. Supreme Court’s decision. The defendant Entergy companies responded to that motion reiterating the additional grounds asserted for federal question jurisdiction, and the District Court held oral argument on the renewed motion to remand in February 2014. In April 2015 the District Court entered an order denying the renewed motion to remand, holding that the District Court has federal question subject matter jurisdiction. The Attorney General appealed to the U.S. Fifth Circuit Court of Appeals the denial of the motion to remand. In July 2015 the Fifth Circuit issued an order denying the appeal, and the Attorney General subsequently filed a petition for rehearing of the request for interlocutory appeal, which was also denied. In December 2015 the District Court ordered that the parties submit to the court undisputed and disputed facts that are material to the Entergy defendants’ motion for judgment on the pleadings, as well as supplemental briefs regarding the same. Those filings were made in January 2016.

In September 2016 the Attorney General filed a mandamus petition with the U.S. Fifth Circuit Court of Appeals in which the Attorney General asked the Fifth Circuit to order the chief judge to reassign this case to another judge. In September 2016 the District Court denied the Entergy companies’ motion for judgment on the pleadings. The Entergy companies filed a motion seeking to amend the District Court’s order denying the Entergy companies’ motion for judgment on the pleadings and allowing an interlocutory appeal. In October 2016 the Fifth Circuit granted the Attorney General’s motion for writ of mandamus and directed the chief judge to assign the case to a new judge. The case was reassigned in October 2016. In January 2017 the District Court denied the Entergy companies’ motion to amend the order denying the motion for judgment on the pleadings. In June 2017 the District Court issued a case management order setting a trial date in November 2018. Discovery is currently in progress.
Entergy New Orleans

Entergy New Orleans’s electric rate schedules include a fuel adjustment tariff designed to reflect no more than targeted fuel and purchased power costs, adjusted by a surcharge or credit for deferred fuel expense arising from the monthly reconciliation of actual fuel and purchased power costs incurred with fuel cost revenues billed to customers, including carrying charges.
 
Entergy New Orleans’s gas rate schedules include a purchased gas adjustment to reflect estimated gas costs for the billing month, adjusted by a surcharge or credit similar to that included in the electric fuel adjustment clause, including carrying charges.

Due to higher fuel costs associated in part with the extended Grand Gulf outage and the partially simultaneous Union Power Block 1 planned outage, for the December 2016, January 2017, and February 2017 billing months, the City Council authorized Entergy New Orleans to cap the fuel adjustment charge billed to customers at $0.035 per kWh and to defer billing of all fuel costs in excess of the capped amount by including such costs in the over- or under-recovery account.

Due to higher fuel costs for the operating month of January 2018 resulting in part from recent cold weather, higher Henry Hub prices, and an increase in total fuel and purchased power costs associated in part with certain plant outages, Entergy New Orleans has proposed to cap the fuel adjustment charge to be billed in March 2018 to non-transmission Entergy New Orleans legacy customers and Entergy New Orleans Algiers customers at $0.035323 per kWh and $0.025446 per kWh, respectively. Entergy New Orleans has also proposed to cap the fuel adjustment charge to be billed in March 2018 for Entergy New Orleans legacy transmission customers at $0.034609 per kWh and to defer billing of all fuel costs in excess of the capped amount by including such costs in the over- or under-recovery account.

Entergy Texas

Entergy Texas’s rate schedules include a fixed fuel factor to recover fuel and purchased power costs, including interest, not recovered in base rates.   Semi-annual revisions of the fixed fuel factor are made in March and September based on the market price of natural gas and changes in fuel mix.  The amounts collected under Entergy Texas’s fixed fuel factor and any interim surcharge or refund are subject to fuel reconciliation proceedings before the PUCT.
        
In August 2014, Entergy Texas filed an application seeking PUCT approval to implement an interim fuel refund of approximately $24.6 million for over-collected fuel costs incurred during the months of November 2012 through April 2014. This refund resulted from (i) applying $48.6 million in bandwidth remedy payments that Entergy Texas received in May 2014 related to the June - December 2005 period to Entergy Texas’s $8.7 million under-recovered fuel balance as of April 30, 2014 and (ii) netting that fuel balance against the $15.3 million bandwidth remedy payment that Entergy Texas made related to calendar year 2013 production costs. Also in August 2014, Entergy Texas filed an unopposed motion for interim rates to implement these refunds for most customers over a two-month period commencing with September 2014. The PUCT issued its order approving the interim relief in August 2014 and Entergy Texas completed the refunds in October 2014. Parties intervened in this matter, and all parties agreed that the proceeding should be bifurcated such that the proposed interim refund would become final in a separate proceeding, which refund was approved by the PUCT in March 2015.   In July 2015 certain parties filed briefs in the open proceeding asserting that Entergy Texas should refund to retail customers an additional $10.9 million in bandwidth remedy payments Entergy Texas received related to calendar year 2006 production costs.  In October 2015 an ALJ issued a proposal for decision recommending that the additional $10.9 million in bandwidth remedy payments be refunded to retail customers. In January 2016 the PUCT issued its order affirming the ALJ’s recommendation, and Entergy Texas filed a motion for rehearing of the PUCT’s decision, which the PUCT denied. In March 2016, Entergy Texas filed a complaint in Federal District Court for the Western District of Texas and a petition in the Travis County (State) District Court appealing the PUCT’s decision. The pending appeals did not stay the PUCT’s decision. In April 2016, Entergy Texas filed with the PUCT an application to refund to customers approximately $56.2 million. The refund resulted from (i) $41.8 million of fuel cost recovery over-collections through February 2016, (ii) the $10.9 million in bandwidth remedy payments, discussed above, that Entergy Texas received related to calendar year 2006 production costs, and (iii) $3.5 million in bandwidth remedy payments that Entergy Texas received related to 2006-2008 production costs. In June 2016, Entergy Texas filed an unopposed settlement agreement that added additional over-recovered fuel costs for the months of March and April 2016. The settlement resulted in a $68 million refund. The ALJ approved the refund on an interim basis to be made to most customers over a four-month period beginning with the first billing cycle of July 2016. In July 2016 the PUCT issued an order approving the interim refund. The federal appeal of the PUCT’s January 2016 decision was heard in December 2016, and the Federal District Court granted Entergy Texas’s requested relief. In January 2017 the PUCT and an intervenor filed petitions for appeal to the U.S. Court of Appeals for the Fifth Circuit of the Federal District Court ruling. Oral argument was held before the U.S. Court of Appeals for the Fifth Circuit in February 2018, and a decision is pending. The State District Court appeal of the PUCT’s January 2016 decision also remains pending.

In July 2016, Entergy Texas filed an application to reconcile its fuel and purchased power costs for the period April 1, 2013 through March 31, 2016. Under a recent PUCT rule change, a fuel reconciliation is required to be filed at least once every three years and outside of a base rate case filing. During the reconciliation period, Entergy Texas incurred approximately $1.77 billion in Texas jurisdictional eligible fuel and purchased power expenses, net of certain revenues credited to such expenses and other adjustments. Entergy Texas estimated an over-recovery balance of approximately $19.3 million, including interest, which Entergy Texas requested authority to carry over as the beginning balance for the subsequent reconciliation period beginning Apri1 2016. Entergy Texas also noted, however, that the estimated $19.3 million over collection was being refunded to customers as a portion of the interim fuel refund beginning with the first billing cycle of July 2016, discussed above. Entergy Texas also requested a prudence finding for each of the fuel-related contracts and arrangements entered into or modified during the reconciliation period that have not been reviewed by the PUCT in a prior proceeding. In December 2016, Entergy Texas entered into a stipulation and settlement agreement resulting in a $6 million disallowance not associated with any particular issue raised and a refund of the over-recovery balance of $21 million as of November 30, 2016, to most customers beginning April 2017 through June 2017. This settlement was developed concurrently with the stipulation and settlement agreement in the 2016 transmission cost recovery factor rider amendment discussed below, and the terms and conditions in both settlements are interdependent. The fuel reconciliation settlement was approved by the PUCT in March 2017 and the refunds were made.

In June 2017, Entergy Texas filed an application for a fuel refund of approximately $30.7 million for the months of December 2016 through April 2017. For most customers, the refunds flowed through bills for the months of July 2017 through September 2017. The fuel refund was approved by the PUCT in August 2017.

In December 2017, Entergy Texas filed an application for a fuel refund of approximately $30.5 million for the months of May 2017 through October 2017. Also in December 2017, the PUCT’s ALJ approved the refund on an interim basis. For most customers, the refunds flowed through bills beginning January 2018 and will continue through March 2018. A final decision in this matter remains pending.
    
Retail Rate Proceedings

Filings with the APSC (Entergy Arkansas)

Retail Rates

2015 Base Rate Filing
 
In April 2015, Entergy Arkansas filed with the APSC for a general change in rates, charges, and tariffs. The filing notified the APSC of Entergy Arkansas’s intent to implement a forward test year formula rate plan pursuant to Arkansas legislation passed in 2015, and requested a retail rate increase of $268.4 million, with a net increase in revenue of $167 million. The filing requested a 10.2% return on common equity. In September 2015 the APSC staff and intervenors filed direct testimony, with the APSC staff recommending a revenue requirement of $217.9 million and a 9.65% return on common equity. In December 2015, Entergy Arkansas, the APSC staff, and certain of the intervenors in the rate case filed with the APSC a joint motion for approval of a settlement of the case that proposed a retail rate increase of approximately $225 million with a net increase in revenue of approximately $133 million; an authorized return on common equity of 9.75%; and a formula rate plan tariff that provides a +/- 50 basis point band around the 9.75% allowed return on common equity. A significant portion of the rate increase is related to Entergy Arkansas’s acquisition in March 2016 of Union Power Station Power Block 2 for a base purchase price of $237 million. The settlement agreement also provided for amortization over a 10-year period of $7.7 million of previously-incurred costs related to ANO post-Fukushima compliance and $9.9 million of previously-incurred costs related to ANO flood barrier compliance. A settlement hearing was held in January 2016. In February 2016 the APSC approved the settlement with one exception that reduced the retail rate increase proposed in the settlement by $5 million. The settling parties agreed to the APSC modifications in February 2016. The new rates were effective February 24, 2016 and began billing with the first billing cycle of April 2016. In March 2016, Entergy Arkansas made a compliance filing regarding the new rates that included an interim base rate adjustment surcharge, effective with the first billing cycle of April 2016, to recover the incremental revenue requirement for the period February 24, 2016 through March 31, 2016. The interim base rate adjustment surcharge was designed to recover a total of $21.1 million over the nine-month period from April 2016 through December 2016.

2016 Formula Rate Plan Filing
    
In July 2016, Entergy Arkansas filed with the APSC its 2016 formula rate plan filing showing Entergy Arkansas’s projected earned return on common equity for the twelve months ended December 31, 2017 test period to be below the formula rate plan bandwidth. The filing requested a $67.7 million revenue requirement increase to achieve Entergy Arkansas’s target earned return on common equity of 9.75%. In October 2016, Entergy Arkansas filed with the APSC revised formula rate plan attachments with an updated request for a $54.4 million revenue requirement increase based on acceptance of certain adjustments and recommendations made by the APSC staff and other intervenors, as well as three additional adjustments identified as appropriate by Entergy Arkansas. In November 2016 a hearing was held and the APSC issued an order directing the parties to brief certain issues. In December 2016 the APSC approved the settlement agreement and the $54.4 million revenue requirement increase with approximately $25 million of the $54.4 million revenue requirement subject to possible future adjustment and refund to customers with interest. The APSC requested supplemental information for some of Entergy Arkansas’s requested nuclear expenditures. In December 2016 the APSC approved Entergy Arkansas’s formula rate plan compliance tariff, and the rates became effective with the first billing cycle of January 2017. In April 2017, Entergy Arkansas filed a motion consented to by all parties requesting that it be permitted to submit the supplemental information requested by the APSC in conjunction with its 2017 formula rate plan filing, which was subsequently made in July 2017 and is discussed below. In May 2017 the APSC approved the joint motion and proposal to review Entergy Arkansas’s supplemental information on a concurrent schedule with the 2017 formula rate plan filing. In October 2017, Entergy Arkansas and the parties to the proceeding filed a joint motion to approve a unanimous settlement agreement resolving all issues in the docket and providing for recovery of the 2017 and 2018 nuclear costs. In December 2017 the APSC approved the settlement agreement and recovery of the 2017 and 2018 nuclear costs.

2017 Formula Rate Plan Filing

In July 2017, Entergy Arkansas filed with the APSC its 2017 formula rate plan filing showing Entergy Arkansas’s projected earned return on common equity for the twelve months ended December 31, 2018 test period to be below the formula rate plan bandwidth.  The filing projected a $129.7 million revenue requirement increase to achieve Entergy Arkansas’s target earned return on common equity of 9.75%.  Entergy Arkansas’s formula rate plan is subject to a four percent annual revenue constraint and the projected annual revenue requirement increase exceeded the four percent, resulting in a proposed increase for the 2017 formula rate plan of $70.9 million. In October 2017, Entergy Arkansas filed with the APSC revised formula rate plan attachments that projected a $126.2 million revenue requirement increase based on acceptance of certain adjustments and recommendations made by the APSC staff and other intervenors. The revised formula rate plan filing included a proposed $71.1 million revenue requirement increase based on a revision to the four percent constraint calculation. In October 2017, Entergy Arkansas and the parties to the proceeding filed a joint motion to approve a unanimous settlement agreement resolving all issues in the docket and providing for recovery of the 2017 and 2018 nuclear costs. In December 2017 the APSC approved the settlement agreement and the $71.1 million revenue requirement increase, as well as Entergy Arkansas’s formula rate plan compliance tariff, and the rates became effective with the first billing cycle of January 2018.
 
Internal Restructuring

In November 2017, Entergy Arkansas filed an application with the APSC seeking authorization to undertake a restructuring that would result in the transfer of substantially all of the assets and operations of Entergy Arkansas to a new entity, which would ultimately be owned by an existing Entergy subsidiary holding company. The restructuring is subject to regulatory review and approval by the APSC, the FERC, and the NRC. Entergy Arkansas also filed a notice with the Missouri Public Service Commission in December 2017 out of an abundance of caution, although Entergy Arkansas does not serve any retail customers in Missouri. If the APSC approves the restructuring by September 1, 2018, and the restructuring closes on or before December 1, 2018, Entergy Arkansas proposed in its application to credit retail customers $66 million over six years, beginning in 2019. In February 2018, Entergy Arkansas filed supplemental testimony reducing the proposed retail customer credits to $39.6 million over six years. If the APSC, the FERC, and the NRC approvals are obtained, Entergy Arkansas expects the restructuring will be consummated on or before December 1, 2018.
It is currently contemplated that Entergy Arkansas would undertake a multi-step restructuring, which would include the following:
Entergy Arkansas would redeem its outstanding preferred stock at the aggregate redemption price of approximately $32.7 million, which includes call premiums, plus accumulated and unpaid dividends, if any.
Entergy Arkansas would convert from an Arkansas corporation to a Texas corporation.
Under the Texas Business Organizations Code (TXBOC), Entergy Arkansas will allocate substantially all of its assets to a new subsidiary, Entergy Arkansas Power, LLC, a Texas limited liability company (Entergy Arkansas Power), and Entergy Arkansas Power will assume substantially all of the liabilities of Entergy Arkansas, in a transaction regarded as a merger under the TXBOC. Entergy Arkansas will remain in existence and hold the membership interests in Entergy Arkansas Power.
Entergy Arkansas will contribute the membership interests in Entergy Arkansas Power to an affiliate (Entergy Utility Holding Company, LLC, a Texas limited liability company and subsidiary of Entergy Corporation). As a result of the contribution, Entergy Arkansas Power will be a wholly-owned subsidiary of Entergy Utility Holding Company, LLC.
Entergy Arkansas will change its name to Entergy Utility Property, Inc., and Entergy Arkansas Power will then change its name to Entergy Arkansas, LLC.

Upon the completion of the restructuring, Entergy Arkansas, LLC will hold substantially all of the assets, and will have assumed substantially all of the liabilities, of Entergy Arkansas. Entergy Arkansas may modify or supplement the steps to be taken to effectuate the restructuring.
Filings with the LPSC (Entergy Louisiana)

Retail Rates - Electric

2014 Formula Rate Plan Filing

In connection with the approval of the business combination of Entergy Gulf States Louisiana and Entergy Louisiana, the LPSC authorized the filing of a single, joint, formula rate plan evaluation report for Entergy Gulf States Louisiana’s and Entergy Louisiana’s 2014 calendar year operations. The joint evaluation report was filed in September 2015 and reflected an earned return on common equity of 9.09%. As such, no adjustment to base formula rate plan revenue was required. The following adjustments were required under the formula rate plan, however: a decrease in the additional capacity mechanism for Entergy Louisiana of $17.8 million; an increase in the additional capacity mechanism for Entergy Gulf States Louisiana of $4.3 million; and a reduction of $5.5 million to the MISO cost recovery mechanism to collect approximately $35.7 million on a combined-company basis. Under the order approving the business combination, following completion of the prescribed review period, rates were implemented with the first billing cycle of December 2015, subject to refund. See “Entergy Louisiana and Entergy Gulf States Louisiana Business Combination” below for further discussion of the business combination. In June 2017 the LPSC staff and Entergy Louisiana filed an unopposed joint report of proceedings, which was accepted by the LPSC in June 2017, finalizing the results of this proceeding with no changes to rates already implemented.

2015 Formula Rate Plan Filing

In May 2016, Entergy Louisiana filed its formula rate plan evaluation report for its 2015 calendar year operations. The evaluation report reflected an earned return on common equity of 9.07%. As such, no adjustment to base formula rate plan revenue was required. The following other adjustments, however, were required under the formula rate plan: an increase in the legacy Entergy Louisiana additional capacity mechanism of $14.2 million; a separate increase in legacy Entergy Louisiana revenue of $10 million primarily to reflect the effects of the termination of the System Agreement; an increase in the legacy Entergy Gulf States Louisiana additional capacity mechanism of $0.5 million; a decrease in legacy Entergy Gulf States Louisiana revenue of $58.7 million primarily to reflect the effects of the termination of the System Agreement; and an increase of $11 million to the MISO cost recovery mechanism. Rates were implemented with the first billing cycle of September 2016, subject to refund. Following implementation of the as-filed rates in September 2016, there were several interim updates to Entergy Louisiana’s formula rate plan, including the one submitted in December 2016, reflecting implementation of the settlement of the Waterford 3 replacement steam generator project prudence review described below. In June 2017 the LPSC staff and Entergy Louisiana filed a joint report of proceedings, which was accepted by the LPSC in June 2017, finalizing the results of the May 2016 evaluation report, interim updates, and corresponding proceedings with no changes to rates already implemented.

Extension of MISO Cost Recovery Mechanism Rider

In November 2016, Entergy Louisiana filed with the LPSC a request to extend the MISO cost recovery mechanism rider provision of its formula rate plan. In March 2017 the LPSC staff submitted direct testimony generally supportive of a one-year extension of the MISO cost recovery mechanism and the intervenor in the proceeding did not oppose an extension for this period of time. In July 2017 an uncontested joint stipulation authorizing a one-year extension of the MISO cost recovery mechanism rider was approved.

2016 Formula Rate Plan Filing

In May 2017, Entergy Louisiana filed its formula rate plan evaluation report for its 2016 calendar year operations. The evaluation report reflected an earned return on common equity of 9.84%. As such, no adjustment to base formula rate plan revenue was required. Adjustments, however, were required under the formula rate plan; the 2016 formula rate plan evaluation report showed a decrease in formula rate plan revenue of approximately $16.9 million, comprised of a decrease in legacy Entergy Louisiana formula rate plan revenue of $3.5 million, a decrease in legacy Entergy Gulf States Louisiana formula rate plan revenue of $9.7 million, and a decrease in incremental formula rate plan revenue of $3.7 million. Additionally, the formula rate plan evaluation report called for a decrease of $40.5 million in the MISO cost recovery revenue requirement from the present level of $46.8 million to $6.3 million. Rates reflecting these adjustments were implemented with the first billing cycle of September 2017, subject to refund. In September 2017 the LPSC issued its report indicating that no changes to Entergy Louisiana’s original formula rate plan evaluation report were required but reserved for several issues, including Entergy Louisiana’s September 2017 update to its formula rate plan evaluation report.

Formula Rate Plan Extension Request

In August 2017, Entergy Louisiana filed a request with the LPSC seeking to extend its formula rate plan for three years (2017-2019) with limited modifications to its terms.  Those modifications include: a one-time resetting of base rates to the midpoint of the band at Entergy Louisiana’s authorized return on equity of 9.95% for the 2017 test year; narrowing of the formula rate plan bandwidth from a total of 160 basis points to 80 basis points; and a forward-looking mechanism that would allow Entergy Louisiana to recover certain transmission-related costs contemporaneously with when those projects begin delivering benefits to customers.  Entergy Louisiana requested that the LPSC consider its request on an expedited basis, in an effort to maintain Entergy Louisiana’s current cycle for implementing rate adjustments, i.e., September 2018, without the need for filing a full base rate case proceeding. Several parties have intervened in the proceeding and all parties have been participating in settlement discussions.

Waterford 3 Replacement Steam Generator Project

Following the completion of the Waterford 3 replacement steam generator project, the LPSC undertook a prudence review in connection with a filing made by Entergy Louisiana in April 2013 with regard to the following aspects of the replacement project: 1) project management; 2) cost controls; 3) success in achieving stated objectives; 4) the costs of the replacement project; and 5) the outage length and replacement power costs. In July 2014 the LPSC staff filed testimony recommending potential project and replacement power cost disallowances of up to $71 million, citing a need for further explanation or documentation from Entergy Louisiana.  An intervenor filed testimony recommending disallowance of $141 million of incremental project costs, claiming the steam generator fabricator was imprudent.  Entergy Louisiana provided further documentation and explanation requested by the LPSC staff. An evidentiary hearing was held in December 2014. At the hearing the parties maintained the positions reflected in pre-filed testimony. Entergy Louisiana believed that the replacement steam generator costs were prudently incurred and applicable legal principles supported their recovery in rates.  Nevertheless, Entergy Louisiana recorded a write-off of $16 million of Waterford 3’s plant balance in December 2014 because of the uncertainty at the time associated with the resolution of the prudence review. In December 2015 the ALJ issued a proposed recommendation, which was subsequently finalized, concluding that Entergy Louisiana prudently managed the Waterford 3 replacement steam generator project, including the selection, use, and oversight of contractors, and could not reasonably have anticipated the damage to the steam generators. Nevertheless, the ALJ concluded that Entergy Louisiana was liable for the conduct of its contractor and subcontractor and, therefore, recommended a disallowance of $67 million in capital costs. Additionally, the ALJ concluded that Entergy Louisiana did not sufficiently justify the incurrence of $2 million in replacement power costs during the replacement outage. Although the ALJ’s recommendation had not yet been considered by the LPSC, after considering the progress of the proceeding in light of the ALJ recommendation, Entergy Louisiana recorded in the fourth quarter 2015 approximately $77 million in charges, including a $45 million asset write-off and a $32 million regulatory charge, to reflect that a portion of the assets associated with the Waterford 3 replacement steam generator project was no longer probable of recovery. Entergy Louisiana maintained that the ALJ’s recommendation contained significant factual and legal errors.

In October 2016 the parties reached a settlement in this matter. The settlement was approved by the LPSC in December 2016. The settlement effectively provided for an agreed-upon disallowance of $67 million of plant, which had been previously written off by Entergy Louisiana, as discussed above. The refund to customers of approximately $71 million as a result of the settlement approved by the LPSC was made to customers in January 2017. Of the $71 million of refunds, $68 million was credited to customers through Entergy Louisiana’s formula rate plan, outside of sharing, and $3 million through its fuel adjustment clause. Entergy Louisiana had previously recorded a provision of $48 million for this refund. The previously-recorded provision included the cumulative revenues recorded through December 2016 related to the $67 million of disallowed plant. An additional regulatory charge of $23 million was recorded in fourth quarter 2016 to reflect the effects of the settlement. The settlement also provided that Entergy Louisiana could retain the value associated with potential service credits agreed to by the project contractor, to the extent they are realized in the future. Following a review by the parties, an unopposed joint report of proceedings was filed by the LPSC staff and Entergy Louisiana in May 2017 and the LPSC accepted the joint report of proceedings resolving the matter.

Ninemile 6

In July 2014, Entergy Gulf States Louisiana and Entergy Louisiana filed an unopposed stipulation with the LPSC, which was subsequently approved, that estimated a first year revenue requirement associated with Ninemile 6 and provided a mechanism to update the revenue requirement as the in-service date approached. In late-December 2014, roughly contemporaneous with the unit's placement in service, a final updated estimated revenue requirement of $26.8 million for Entergy Gulf States Louisiana and $51.1 million for Entergy Louisiana was filed. The December 2014 estimate formed the basis of rates implemented effective with the first billing cycle of January 2015. In July 2015, Entergy Louisiana submitted to the LPSC a compliance filing including an estimate at completion, inclusive of interconnection costs and transmission upgrades, of approximately $648 million, or $76 million less than originally estimated, along with other project details and supporting evidence, to enable the LPSC to review the prudence of Entergy Louisiana’s management of the project. Testimony filed by the LPSC staff generally supported the prudence of the management of the project and recovery of the costs incurred to complete the project. The LPSC staff had questioned the warranty coverage for one element of the project. In October 2016 all parties agreed to a stipulation providing that 100% of Ninemile 6 construction costs was prudently incurred and is eligible for recovery from customers, but reserving the LPSC’s rights to review the prudence of Entergy Louisiana’s actions regarding one element of the project. This stipulation was approved by the LPSC in January 2017.

Union Power Station and Deactivation or Retirement Decisions for Entergy Louisiana Plants

In January 2015, Entergy Gulf States Louisiana filed its application with the LPSC for approval of the acquisition and cost recovery of two power blocks of the Union Power Station for an expected base purchase price of approximately $237 million per power block, subject to adjustments. In September 2015, Entergy Gulf States Louisiana agreed to settlement terms with all parties for Entergy Gulf States Louisiana’s purchase of the two power blocks. In October 2015 the LPSC voted unanimously to approve the uncontested settlement which finds, among other things, that acquisition of Power Blocks 3 and 4 is in the public interest and, therefore, prudent. The business combination of Entergy Gulf States Louisiana and Entergy Louisiana received regulatory approval and closed in October 2015 making Entergy Louisiana the named purchaser of Power Blocks 3 and 4 of the Union Power Station. In March 2016, Entergy Louisiana acquired Power Blocks 3 and 4 of Union Power Station for an aggregate purchase price of approximately $474 million and implemented rates to collect the estimated first-year revenue requirement with the first billing cycle of March 2016.

As a term of the LPSC-approved settlement authorizing the purchase of Power Blocks 3 and 4 of the Union Power Station, Entergy Louisiana agreed to make a filing with the LPSC to review its decisions to deactivate Ninemile 3 and Willow Glen 2 and 4 and its decision to retire Little Gypsy 1.  In January 2016, Entergy Louisiana made its compliance filing with the LPSC. Entergy Louisiana, LPSC staff, and intervenors participated in a technical conference in March 2016 where Entergy Louisiana presented information on its deactivation/retirement decisions for these four units in addition to information on the current deactivation decisions for the ten-year planning horizon. Parties have requested further proceedings on the prudence of the decision to deactivate Willow Glen 2 and 4.  No party contests the prudence of the decision to deactivate Willow Glen 2 and 4 or suggests reactivation of these units; however, issues have been raised related to Entergy Louisiana’s decision to give up its transmission service rights in MISO for Willow Glen 2 and 4 rather than placing the units into suspended status for the three-year term permitted by MISO. An evidentiary hearing was held in August 2017 and post-hearing briefs were submitted in October 2017. A decision is expected in 2018.

Retail Rates - Gas 

In accordance with the settlement of Entergy Gulf States Louisiana’s gas rate stabilization plan for the test year ended September 30, 2012, in August 2014, Entergy Gulf States Louisiana submitted for consideration a proposal for implementation of an infrastructure rider to recover expenditures associated with strategic plant investment and relocation projects mandated by local governments. After review by the LPSC staff and inclusion of certain customer safeguards required by the LPSC staff, in December 2014, Entergy Gulf States Louisiana and the LPSC staff submitted a joint settlement for implementation of an accelerated gas pipe replacement program providing for the replacement of approximately 100 miles of pipe over the next ten years, as well as relocation of certain existing pipe resulting from local government-related infrastructure projects, and for a rider to recover the investment associated with these projects. The rider allows for recovery of approximately $65 million over ten years. The rider recovery will be adjusted on a quarterly basis to include actual investment incurred for the prior quarter and is subject to the following conditions, among others: a ten-year term; application of any earnings in excess of 10.45% as an offset to the revenue requirement of the infrastructure rider; adherence to a specified spending plan, within plus or minus 20% annually; annual filings comparing actual versus planned rider spending with actual spending and explanation of variances exceeding 10%; and an annual true-up. The joint settlement was approved by the LPSC in January 2015. Implementation of the infrastructure rider commenced with bills rendered on and after the first billing cycle of April 2015.

2014 Rate Stabilization Plan Filing

In January 2015, Entergy Gulf States Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2014.  The filing showed an earned return on common equity of 7.20%, which resulted in a $706 thousand rate increase.  In April 2015 the LPSC issued findings recommending two adjustments to Entergy Gulf States Louisiana’s as-filed results, and an additional recommendation that did not affect the results. The LPSC staff’s recommended adjustments increase the earned return on equity for the test year to 7.24%. Entergy Gulf States Louisiana accepted the LPSC staff’s recommendations and a revenue increase of $688 thousand was implemented with the first billing cycle of May 2015.

2015 Rate Stabilization Plan Filing

In January 2016, Entergy Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2015. The filing showed an earned return on common equity of 10.22%, which is within the authorized bandwidth, therefore requiring no change in rates. In March 2016 the LPSC staff issued its report stating that the 2015 gas rate stabilization plan filing was in compliance with the exception of several issues that required additional information, explanation, or clarification for which the LPSC staff had reserved the right to further review. In July 2016 the parties to the proceeding filed an unopposed joint report and motion for entry of order accepting the report that indicated no outstanding issues remained in the filing.

In February 2016, Entergy Louisiana filed a motion requesting to extend the term of the gas rate stabilization plan in substantially similar form for an additional three-year term and included a request for sharing of non-jurisdictional compressed natural gas revenues. Following discovery and the filing of testimony by the LPSC staff, Entergy Louisiana and the LPSC submitted a joint motion for hearing an uncontested stipulated settlement resolving the proceeding. A hearing on the stipulation was held in November 2016. The ALJ issued a report of proceedings that was presented with the parties’ stipulation to the LPSC for consideration. The stipulation approving Entergy Louisiana’s requested extension of the rate stabilization plan was approved by the LPSC in December 2016.

2016 Rate Stabilization Plan Filing

In January 2017, Entergy Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2016. The filing of the evaluation report for test year 2016 reflected an earned return on common equity of 6.37%. As part of the original filing, pursuant to the extraordinary cost provision of the rate stabilization plan, Entergy Louisiana sought to recover approximately $1.5 million in deferred operation and maintenance expenses incurred to restore service and repair damage resulting from flooding and widespread rainfall in southeast Louisiana that occurred in August 2016. Entergy Louisiana requested to recover the prudently incurred August 2016 storm restoration costs over ten years, outside of the rate stabilization plan sharing provisions. As a result, Entergy Louisiana’s filing sought an annual increase in revenue of $1.4 million. Following review of the filing, except for the proposed extraordinary cost recovery, the LPSC staff confirmed Entergy Louisiana’s filing was consistent with the principles and requirements of the rate stabilization plan. The extraordinary cost recovery request associated with the 2016 flood-related deferred operation and maintenance expenses incurred for gas operations was removed from the rate stabilization plan pending LPSC consideration in a separate docket. In April 2017 the LPSC approved a joint report of proceedings and Entergy Louisiana submitted a revised evaluation report reflecting a $1.2 million annual increase in revenue with rates implemented with the first billing cycle of May 2017.

In connection with the joint report of proceedings accepted by the LPSC, in May 2017, Entergy Louisiana filed an application to initiate a separate proceeding to recover through the extraordinary cost provision of the gas rate stabilization plan the deferred operation and maintenance expenses of $1.4 million incurred to restore service and repair damage resulting from flooding and widespread rainfall in southeast Louisiana that occurred in August 2016. The LPSC staff submitted its direct testimony in the proceeding recommending recovery of $0.9 million. Entergy Louisiana filed rebuttal testimony responding to the LPSC staff’s recommendation. The procedural schedule was suspended to allow the parties to engage in settlement negotiations, and in February 2018 the LPSC staff and Entergy Louisiana filed an unopposed settlement. If approved by the LPSC, the settlement would provide for Entergy Louisiana to recover, over ten years, the approximately $1.4 million in deferred operation and maintenance expense and related carrying charges. The settlement further provides for recovery to commence in May 2018.

2017 Rate Stabilization Plan Filing

In January 2018, Entergy Louisiana filed with the LPSC its gas rate stabilization plan for test year ended September 30, 2017.  The filing of the evaluation report for the test year 2017 reflected an earned return on common equity of 9.06%.  This earned return is below the earnings sharing band of the rate stabilization plan and results in a rate increase of $0.1 million.  Due to the enactment in late-December 2017 of the Tax Cuts and Jobs Act, Entergy Louisiana did not have adequate time to reflect the effects of this tax legislation in the rate stabilization plan.  As a result, Entergy Louisiana will file a supplement to the January 2018 evaluation report to reflect, among other things, a 21% federal corporate income tax rate.  Any rate change resulting from the revised rate stabilization plan will become effective in rates in May 2018.

Filings with the MPSC (Entergy Mississippi)

Formula Rate Plan Filings

In March 2016, Entergy Mississippi submitted its formula rate plan 2016 test year filing showing Entergy Mississippi’s projected earned return for the 2016 calendar year to be below the formula rate plan bandwidth. The filing showed a $32.6 million rate increase was necessary to reset Entergy Mississippi’s earned return on common equity to the specified point of adjustment of 9.96%, within the formula rate plan bandwidth. In June 2016 the MPSC approved Entergy Mississippi’s joint stipulation with the Mississippi Public Utilities Staff. The joint stipulation provided for a total revenue increase of $23.7 million. The revenue increase includes a $19.4 million increase through the formula rate plan, resulting in a return on common equity point of adjustment of 10.07%. The revenue increase also includes $4.3 million in incremental ad valorem tax expenses to be collected through an updated ad valorem tax adjustment rider. The revenue increase and ad valorem tax adjustment rider were effective with the July 2016 bills.

In March 2017, Entergy Mississippi submitted its formula rate plan 2017 test year filing and 2016 look-back filing showing Entergy Mississippi’s earned return for the historical 2016 calendar year and projected earned return for the 2017 calendar year to be within the formula rate plan bandwidth, resulting in no change in rates. In June 2017, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a stipulation that confirmed that Entergy Mississippi’s earned returns for both the 2016 look-back filing and 2017 test year were within the respective formula rate plan bandwidths. In June 2017 the MPSC approved the stipulation, which resulted in no change in rates.

Filings with the City Council (Entergy New Orleans)

Retail Rates

See “Algiers Asset Transfer” below for discussion of the Algiers asset transfer. As a provision of the settlement agreement approved by the City Council in May 2015 providing for the Algiers asset transfer, it was agreed that, with limited exceptions, no action may be taken with respect to Entergy New Orleans’s base rates until rates are implemented from a base rate case that must be filed for its electric and gas operations in 2018. This provision eliminated the formula rate plan applicable to Algiers operations. The limited exceptions included continued implementation of the then-remaining two years of the four-year phased-in rate increase for the Algiers area and certain exceptional cost increases or decreases in the base revenue requirement. An additional provision of the settlement agreement allowed for continued recovery of the revenue requirement associated with the capacity and energy from Ninemile 6 received by Entergy New Orleans under a power purchase agreement with Entergy Louisiana (Algiers PPA). The settlement authorized Entergy New Orleans to recover the remaining revenue requirement related to the Algiers PPA through base rates charged to Algiers customers. The settlement also provided for continued implementation of the Algiers MISO recovery rider.

In addition to the Algiers PPA, Entergy New Orleans has a separate power purchase agreement with Entergy Louisiana for 20% of the capacity and energy from Ninemile 6 (Ninemile PPA), which commenced operation in December 2014. Initially, recovery of the non-fuel costs associated with the Ninemile PPA was authorized through a special Ninemile 6 rider billed only to Entergy New Orleans customers outside of Algiers.

In August 2015, Entergy New Orleans filed an application with the City Council seeking authorization to proceed with the purchase of Union Power Block 1, with an expected base purchase price of approximately $237 million, subject to adjustments, and seeking approval of the recovery of the associated costs. In November 2015 the City Council issued written resolutions and an order approving an agreement in principle between Entergy New Orleans and City Council advisors providing that the purchase of Union Power Block 1 and related assets by Entergy New Orleans is prudent and in the public interest. The City Council authorized expansion of the terms of the purchased power and capacity acquisition cost recovery rider to recover the non-fuel purchased power expense from Ninemile 6, the revenue requirement associated with the purchase of Power Block 1 of the Union Power Station, and a credit to customers of $400 thousand monthly beginning June 2016 in recognition of the decrease in other operation and maintenance expenses that would result with the deactivation of Michoud Units 2 and 3. In March 2016, Entergy New Orleans purchased Power Block 1 of the Union Power Station for approximately $237 million and initiated recovery of these costs with March 2016 bills. In July 2016, Entergy New Orleans and the City Council Utility Committee agreed to a temporary increase in the Michoud credit to customers to a total of $1.4 million monthly for August 2016 through December 2016.

A 2008 rate case settlement included $3.1 million per year in electric rates to fund the Energy Smart energy efficiency programs.  The rate settlement provided an incentive for Entergy New Orleans to meet or exceed energy savings targets set by the City Council and provided a mechanism for Entergy New Orleans to recover lost contribution to fixed costs associated with the energy savings generated from the energy efficiency programs. In January 2015 the City Council approved funding for the Energy Smart program from April 2015 through March 2017 using the remainder of the approximately $12.8 million of 2014 rough production cost equalization funds, with any remaining costs being recovered through the fuel adjustment clause. This funding methodology was modified in November 2015 when the City Council directed Entergy New Orleans to use a combination of guaranteed customer savings related to a prior agreement with the City Council and rough production cost equalization funds to cover program costs prior to recovering any costs through the fuel adjustment clause. In April 2017 the City Council approved an implementation plan for the Energy Smart program from April 2017 through December 2019. The City Council directed that the $11.8 million balance reported for Energy Smart funds be used to continue funding the program for Entergy New Orleans’s legacy customers and that the Energy Smart Algiers program continue to be funded through the Algiers fuel adjustment clause, until additional customer funding is required for the legacy customers. In September 2017, Entergy New Orleans filed a supplemental plan and proposed several options for an interim cost recovery mechanism necessary to recover program costs during the period between when existing funds directed to Energy Smart programs are depleted (estimated to be June 2018) and when new rates from the anticipated 2018 combined rate case, which will include a cost recovery mechanism for Energy Smart funding, take effect (estimated to be August 2019). Entergy New Orleans requested that the City Council approve a cost recovery mechanism prior to June 2018. In December 2017 the City Council approved an energy efficiency cost recovery rider as an interim funding mechanism for Energy Smart, subject to verification that no additional funding sources exist.

Internal Restructuring

In July 2016, Entergy New Orleans filed an application with the City Council seeking authorization to undertake a restructuring that would result in the transfer of substantially all of the assets and operations of Entergy New Orleans, Inc. to a new entity, which would ultimately be owned by an existing Entergy subsidiary holding company. The restructuring was subject to regulatory review and approval by the City Council and the FERC. In May 2017 the City Council adopted a resolution approving the proposed internal restructuring pursuant to an agreement in principle with the City Council advisors and certain intervenors. Pursuant to the agreement in principle, Entergy New Orleans would credit retail customers $10 million in 2017, $1.4 million in the first quarter of the year after the transaction closes, and $117,500 each month in the second year after the transaction closes until such time as new base rates go into effect as a result of the anticipated 2018 base rate case. Entergy New Orleans began crediting retail customers in June 2017. In June 2017 the FERC approved the transaction and, pursuant to the agreement in principle, Entergy New Orleans will provide additional credits to retail customers of $5 million in each of the years 2018, 2019, and 2020.

In November 2017, pursuant to the agreement in principle, Entergy New Orleans undertook a multi-step restructuring, including the following:

Entergy New Orleans, Inc. redeemed its outstanding preferred stock at a price of approximately $21 million, which included a call premium of approximately $819,000, plus any accumulated and unpaid dividends.
Entergy New Orleans, Inc. converted from a Louisiana corporation to a Texas corporation.
Under the Texas Business Organizations Code (TXBOC), Entergy New Orleans, Inc. allocated substantially all of its assets to a new subsidiary, Entergy New Orleans Power, LLC, a Texas limited liability company (Entergy New Orleans Power), and Entergy New Orleans Power assumed substantially all of the liabilities of Entergy New Orleans, Inc., in a transaction regarded as a merger under the TXBOC. Entergy New Orleans, Inc. remained in existence and held the membership interests in Entergy New Orleans Power.
Entergy New Orleans, Inc. contributed the membership interests in Entergy New Orleans Power to an affiliate (Entergy Utility Holding Company, LLC, a Texas limited liability company and subsidiary of Entergy Corporation). As a result of the contribution, Entergy New Orleans Power is a wholly-owned subsidiary of Entergy Utility Holding Company, LLC.

In December 2017, Entergy New Orleans, Inc. changed its name to Entergy Utility Group, Inc., and Entergy New Orleans Power then changed its name to Entergy New Orleans, LLC. Entergy New Orleans, LLC holds substantially all of the assets, and has assumed substantially all of the liabilities, of Entergy New Orleans, Inc. The restructuring was accounted for as a transaction between entities under common control.

Filings with the PUCT and Texas Cities (Entergy Texas)

Retail Rates

2011 Rate Case

In November 2011, Entergy Texas filed a rate case requesting a $112 million base rate increase reflecting a 10.6% return on common equity based on an adjusted June 2011 test year.  The rate case also proposed a purchased power recovery rider.  On January 12, 2012, the PUCT voted not to address the purchased power recovery rider in the rate case, but the PUCT voted to set a baseline in the rate case proceeding that would be applicable if a purchased power capacity rider is approved in a separate proceeding.  In April 2012 the PUCT Staff filed direct testimony recommending a base rate increase of $66 million and a 9.6% return on common equity.  The PUCT Staff, however, subsequently filed a statement of position in the proceeding indicating that it was still evaluating the position it would ultimately take in the case regarding Entergy Texas’s recovery of purchased power capacity costs and Entergy Texas’s proposal to defer its MISO transition expenses.  In April 2012, Entergy Texas filed rebuttal testimony indicating a revised request for a $105 million base rate increase.  A hearing was held in late-April through early-May 2012.

In September 2012 the PUCT issued an order approving a $28 million rate increase, effective July 2012.  The order included a finding that “a return on common equity (ROE) of 9.80 percent will allow [Entergy Texas] a reasonable opportunity to earn a reasonable return on invested capital.”  The order also provided for increases in depreciation rates and the annual storm reserve accrual.  The order also reduced Entergy Texas’s proposed purchased power capacity costs, stating that they are not known and measurable; reduced Entergy Texas’s regulatory assets associated with Hurricane Rita; excluded from rate recovery capitalized financially-based incentive compensation; included $1.6 million of MISO transition expense in base rates; and reduced Entergy’s Texas’s fuel reconciliation recovery by $4 million because the PUCT disagreed with the line-loss factor used in the calculation.  After considering the progress of the proceeding in light of the PUCT order, Entergy Texas recorded in the third quarter 2012 an approximate $24 million charge to recognize that assets associated with Hurricane Rita, financially-based incentive compensation, and fuel recovery are no longer probable of recovery.  Entergy Texas believed that it was entitled to recover these prudently incurred costs, however, and it filed a motion for rehearing regarding these and several other issues in the PUCT’s order on October 4, 2012.  Several other parties also filed motions for rehearing of the PUCT’s order.  The PUCT subsequently denied rehearing of substantive issues.  Several parties, including Entergy Texas, appealed various aspects of the PUCT’s order to the Travis County District Court. A hearing was held in July 2014. In October 2014 the Travis County District Court issued an order upholding the PUCT’s decision except as to the line-loss factor issue referenced above, which was found in favor of Entergy Texas. In November 2014, Entergy Texas and other parties, including the PUCT, appealed the Travis County District Court decision to the Third Court of Appeals. Oral argument before the court panel was held in September 2015. In April 2016 the Third Court of Appeals issued its opinion affirming the District Court’s decision on all points. Entergy Texas petitioned the Texas Supreme Court to hear its appeal of the Third Court’s ruling. In September 2017 the Texas Supreme Court denied the petitions for review. Entergy Texas filed a motion for rehearing of the Texas Supreme Court’s denial of the petition for review. In January 2018 the Texas Supreme Court denied Entergy Texas’s motion for rehearing.

Distribution cost recovery factor (DCRF) rider

In September 2015, Entergy Texas filed to amend its DCRF rider. Entergy Texas requested an increase in recovery under the rider of $6.5 million, for a total collection of $10.1 million annually from retail customers. In October 2015 intervenors and PUCT staff filed testimony opposing, in part, Entergy Texas’s request. In November 2015, Entergy Texas and the parties filed an unopposed settlement agreement and supporting documents. The settlement established an annual revenue requirement of $8.65 million for the amended DCRF rider, with the resulting rates effective for usage on and after January 1, 2016. The PUCT approved the settlement agreement in February 2016.

In June 2017, Entergy Texas filed an application to amend its DCRF rider by increasing the total collection from $8.65 million to approximately $19 million. In July 2017, Entergy Texas, the PUCT, and the two other parties in the proceeding entered into an unopposed stipulation and settlement agreement resulting in an amended DCRF annual revenue requirement of $18.3 million, with the resulting rates effective for usage no later than October 1, 2017. In September 2017 the PUCT issued its final order approving the unopposed stipulation and settlement agreement. The amended DCRF rider rates became effective for usage on and after September 1, 2017.
    
Transmission cost recovery factor (TCRF) rider

In September 2015, Entergy Texas filed for a TCRF rider requesting a $13 million increase, incremental to base rates. Testimony was filed in November 2015, with the PUCT staff and other parties proposing various disallowances involving, among other things, MISO charges, vegetation management costs, and bad debt expenses that would reduce the requested increase by approximately $2 million. In addition to those recommended disallowances, a number of parties recommended that Entergy Texas’s request be reduced by an additional $3.4 million to account for load growth since base rates were last set. A hearing on the merits was held in December 2015. In February 2016 a State Office of Administrative Hearings ALJ issued a proposal for decision recommending that the PUCT disallow approximately $2 million from Entergy Texas’s $13 million request, but recommending that the PUCT not accept the load growth offset. In June 2016 the PUCT indicated that it would take up in a future rulemaking project the issue of whether a load growth adjustment should apply to a TCRF. In July 2016 the PUCT issued an order generally accepting the proposal for decision but declining to adjust the TCRF baseline in two instances as recommended by the ALJ, which resulted in a total annual allowance of approximately $10.5 million. The PUCT also ordered its staff and Entergy Texas to track all spare autotransformer transfers going forward so that it could address the appropriate accounting treatment and prudence of such transfers in Entergy Texas’s next base rate case. Entergy Texas implemented the TCRF rider beginning with September 2016 bills.

In September 2016, Entergy Texas filed with the PUCT a request to amend its TCRF rider. The proposed amended TCRF rider is designed to collect approximately $29.5 million annually from Entergy Texas’s retail customers. This amount includes the approximately $10.5 million annually that Entergy Texas is currently authorized to collect through the TCRF rider, as discussed above. In December 2016, concurrent with the 2016 fuel reconciliation stipulation and settlement agreement discussed above, Entergy Texas and the PUCT reached a settlement agreeing to the amended TCRF annual revenue requirement of $29.5 million. As discussed above, the terms of the two settlements are interdependent. The PUCT approved the settlement and issued a final order in March 2017. Entergy Texas implemented the amended TCRF rider beginning with bills covering usage on and after March 20, 2017.

Advanced Metering Infrastructure (AMI) Filings

Entergy Arkansas

In September 2016, Entergy Arkansas filed an application seeking a finding from the APSC that Entergy Arkansas’s deployment of AMI is in the public interest. Entergy Arkansas proposed to replace existing meters with advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems. AMI is intended to serve as the foundation of Entergy Arkansas’s modernized power grid. The filing included an estimate of implementation costs for AMI of $208 million. The filing identified a number of quantified and unquantified benefits, and Entergy Arkansas provided a cost benefit analysis showing that its AMI deployment is expected to produce a nominal net benefit to customers of $406 million. Entergy Arkansas also sought to continue to include in rate base the remaining book value of existing meters, which was approximately $57 million at December 31, 2015, that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates. Entergy Arkansas proposed a 15-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019. Deployment of the communications network is expected to begin in 2018. Entergy Arkansas proposed to include the AMI deployment costs and the quantified benefits in future formula rate plan filings, and the 2018 costs were approved in the 2017 formula rate plan filing. In June 2017 the APSC staff and Arkansas Attorney General filed direct testimony. The APSC staff generally supported Entergy Arkansas’s AMI deployment conditioned on various recommendations. The Arkansas Attorney General’s consultant primarily recommended denial of Entergy Arkansas’s application but alternatively suggested recommendations in the event the APSC approves Entergy Arkansas’s proposal. Entergy Arkansas filed rebuttal testimony in June 2017, substantially accepting the APSC staff’s recommendations. In August 2017, Entergy Arkansas and the parties to the proceeding filed a joint motion to approve a unanimous settlement agreement. In October 2017 the APSC issued an order finding that Entergy Arkansas’s AMI deployment is in the public interest and approving the settlement agreement subject to a minor modification. Entergy Arkansas expects to recover the undepreciated balance of its existing meters through a regulatory asset to be amortized over 15 years. Entergy Arkansas has begun discussions with the other parties to implement the items in the settlement agreement including pre-pay and time of use programs.

Entergy Louisiana

In November 2016, Entergy Louisiana filed an application seeking a finding from the LPSC that Entergy Louisiana’s deployment of advanced electric and gas metering infrastructure is in the public interest. Entergy Louisiana proposed to deploy advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems. AMI is intended to serve as the foundation of Entergy Louisiana’s modernized power grid. The filing included an estimate of implementation costs for AMI of $330 million. The filing identified a number of quantified and unquantified benefits, and Entergy Louisiana provided a cost/benefit analysis showing that its combined electric and gas AMI deployment is expected to produce a nominal net benefit to customers of $607 million. Entergy Louisiana also sought to continue to include in rate base the remaining book value, approximately $92 million at December 31, 2015, of the existing electric meters and also to depreciate those assets using current depreciation rates. Entergy Louisiana proposed a 15-year useful life for the new advanced meters, the three-year deployment of which is expected to begin in 2019. The communications network deployment is expected to begin by late-2018, after the necessary information technology infrastructure is in place. Entergy Louisiana proposed to recover the cost of AMI through the implementation of a customer charge, net of certain benefits, phased in over the period 2019 through 2022. The parties reached an uncontested stipulation permitting implementation of Entergy Louisiana’s proposed AMI system, with modifications to the proposed customer charge. In July 2017 the LPSC approved the stipulation. Entergy Louisiana expects to recover the undepreciated balance of its existing meters through a regulatory asset to be amortized at current depreciation rates.

Entergy Mississippi

In November 2016, Entergy Mississippi filed an application seeking an order from the MPSC granting a certificate of public convenience and necessity and finding that Entergy Mississippi’s deployment of AMI is in the public interest. Entergy Mississippi proposed to replace existing meters with advanced meters that enable two-way data communication; to design and build a secure and reliable network to support such communications; and to implement support systems. AMI is intended to serve as the foundation of Entergy Mississippi’s modernized power grid. The filing included an estimate of implementation costs for AMI of $132 million. The filing identified a number of quantified and unquantified benefits, and Entergy Mississippi provided a cost benefit analysis showing that its AMI deployment is expected to produce a nominal benefit to customers of $496 million over a 15-year period, which when netted against the costs of AMI results in $183 million of net customer benefits. Entergy Mississippi also sought to continue to include in rate base the remaining book value, approximately $56 million at December 31, 2015, of existing meters that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates. Entergy Mississippi proposed a 15-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019, subject to approval by the MPSC, with deployment of the communications network expected to begin in 2018. Entergy Mississippi proposed to include the AMI deployment costs and the quantified benefits in existing rate mechanisms, primarily through future formula rate plan filings and/or future energy cost recovery rider schedule re-determinations, as applicable. In May 2017 the Mississippi Public Utilities Staff and Entergy Mississippi entered into and filed a joint stipulation supporting Entergy Mississippi’s filing, and the MPSC issued an order approving the filing without material changes, finding that Entergy Mississippi’s deployment of AMI is in the public interest and granting a certificate of public convenience and necessity. The MPSC order also confirmed that Entergy Mississippi shall continue to include in rate base the remaining book value of existing meters that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates.

Entergy New Orleans

In October 2016, Entergy New Orleans filed an application seeking a finding from the City Council that Entergy New Orleans’s deployment of advanced electric and gas metering infrastructure is in the public interest.  Entergy New Orleans proposed to deploy advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems.  AMI is intended to serve as the foundation of Entergy New Orleans’s modernized power grid.  The filing included an estimate of implementation costs for AMI of $75 million. The filing identified a number of quantified and unquantified benefits, and Entergy New Orleans provided a cost/benefit analysis showing that its combined electric and gas AMI deployment is expected to produce a nominal net benefit to customers of $101 million.  Entergy New Orleans also sought to continue to include in rate base the remaining book value, approximately $21 million at December 31, 2015, of the existing electric meters and also to depreciate those assets using current depreciation rates.  Entergy New Orleans proposed a 15-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019.  Deployment of the information technology infrastructure began in 2017 and deployment of the communications network is expected to begin in 2018.  Entergy New Orleans proposed to recover the cost of AMI through the implementation of a customer charge, net of certain benefits, phased in over the period 2019 through 2022.  The City Council’s advisors filed testimony in May 2017 recommending the adoption of AMI subject to certain modifications, including the denial of Entergy New Orleans’s proposed customer charge as a cost recovery mechanism. In January 2018 a settlement was reached between the City Council’s advisors and Entergy New Orleans. In February 2018 the City Council approved the settlement, which deferred cost recovery to the 2018 Entergy New Orleans rate case, but also stated that an adjustment for 2018-2019 AMI costs can be filed in the rate case and that, for all subsequent AMI costs, the mechanism to be approved in the 2018 rate case will allow for the timely recovery of such costs.

Entergy Texas

In April 2017 the Texas legislature enacted legislation that extends statutory support for AMI deployment to Entergy Texas and directs that if Entergy Texas elects to deploy AMI, it shall do so as rapidly as practicable. In July 2017, Entergy Texas filed an application seeking an order from the PUCT approving Entergy Texas’s deployment of AMI. Entergy Texas proposed to replace existing meters with advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems. AMI is intended to serve as the foundation of Entergy Texas’s modernized power grid. The filing included an estimate of implementation costs for AMI of $132 million. The filing identified a number of quantified and unquantified benefits, with Entergy Texas showing that its AMI deployment is expected to produce nominal net operational cost savings to customers of $33 million. Entergy Texas also sought to continue to include in rate base the remaining book value, approximately $41 million at December 31, 2016, of existing meters that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates. Entergy Texas proposed a seven-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019. Entergy Texas also proposed a surcharge tariff to recover the reasonable and necessary costs it has and will incur under the deployment plan for the full deployment of advanced meters. Further, Entergy Texas sought approval of fees that would be charged to customers who choose to opt out of receiving service through an advanced meter and instead receive electric service with a non-standard meter. In October 2017, Entergy Texas and other parties entered into and filed an unopposed stipulation and settlement agreement, permitting deployment of AMI with limited modifications. The PUCT approved the stipulation and settlement agreement in December 2017. Consistent with the approval, deployment of the communications network is expected to begin in 2018. Entergy Texas expects to recover the remaining net book value of its existing meters through a regulatory asset to be amortized at current depreciation rates.

Entergy Louisiana and Entergy Gulf States Louisiana Business Combination

Entergy Louisiana and Entergy Gulf States Louisiana filed an application with the LPSC in September 2014 seeking authorization to undertake transactions that would result in the combination of Entergy Louisiana and Entergy Gulf States Louisiana into a single public utility. An uncontested stipulated settlement (stipulated settlement) was filed with the LPSC in July 2015. Through the stipulated settlement, the parties agreed to terms upon which to recommend that the LPSC find that the business combination was in the public interest. The stipulated settlement, which was either joined, or unopposed, by all parties to the LPSC proceeding, represented a compromise of stakeholder positions and was the result of an extensive period of analysis, discovery, and negotiation. The stipulated settlement provided $107 million in guaranteed customer benefits during the first nine years following the transaction’s close. Additionally, the combined company would honor the 2013 Entergy Louisiana and Entergy Gulf States Louisiana rate case settlements, including the commitments that (1) there would be no rate increase for legacy Entergy Gulf States Louisiana customers for the 2014 test year, and (2) through the 2016 test year formula rate plan, Entergy Louisiana (as a combined entity) would not raise rates by more than $30 million, net of the $10 million rate increase included in the Entergy Louisiana legacy formula rate plan. The stipulated settlement also provided that Entergy Gulf States Louisiana and Entergy Louisiana would be permitted to defer certain external costs that were incurred to achieve the business combination’s customer benefits. In 2015 deferrals of $16 million for these external costs were recorded, and they are being amortized over a 10-year period. The LPSC approved the business combination in August 2015.

On October 1, 2015, the businesses formerly conducted by Entergy Louisiana and Entergy Gulf States Louisiana were combined into a single public utility. With the completion of the business combination, Entergy Louisiana holds substantially all of the assets, and has assumed the liabilities, of Entergy Louisiana and Entergy Gulf States Louisiana. The combination was accounted for as a transaction between entities under common control. See Note 3 to the financial statements for further discussion of the customer credits resulting from the business combination.

Algiers Asset Transfer (Entergy Louisiana and Entergy New Orleans)

In October 2014, Entergy Louisiana and Entergy New Orleans filed an application with the City Council seeking authorization to undertake a transaction that would result in the transfer from Entergy Louisiana to Entergy New Orleans of certain assets that supported the provision of service to Entergy Louisiana’s customers in Algiers. In April 2015 the FERC issued an order approving the Algiers assets transfer. In May 2015 the parties filed a settlement agreement authorizing the Algiers assets transfer and the settlement agreement was approved by a City Council resolution in May 2015. On September 1, 2015, Entergy Louisiana transferred its Algiers assets to Entergy New Orleans for a purchase price of approximately $85 million. Entergy New Orleans paid Entergy Louisiana $59.6 million, including final true-ups, from available cash and issued a note payable to Entergy Louisiana in the amount of $25.5 million.

System Agreement Cost Equalization Proceedings

Prior to its final termination in 2016, the Utility operating companies historically engaged in the coordinated planning, construction, and operation of generating and bulk transmission facilities under the terms of the System Agreement.  Entergy Arkansas terminated its participation in the System Agreement in December 2013. Entergy Mississippi terminated its participation in the System Agreement in November 2015. The System Agreement terminated with respect to its remaining participants in August 2016.

Although the System Agreement has terminated, certain of the Utility operating companies’ retail regulators continue to pursue litigation involving the System Agreement at the FERC and in federal courts.  The proceedings include challenges to the allocation of costs as defined by the System Agreement and other matters.

In June 2005 the FERC issued a decision in System Agreement litigation that had been commenced by the LPSC, and essentially affirmed its decision in a December 2005 order on rehearing.  The decision included, among other things:

The FERC’s conclusion that the System Agreement no longer roughly equalizes total production costs among the Utility operating companies.
In order to reach rough production cost equalization, the FERC imposed a bandwidth remedy by which each company’s total annual production costs will have to be within +/- 11% of Entergy System average total annual production costs.
In calculating the production costs for this purpose under the FERC’s order, output from the Vidalia hydroelectric power plant will not reflect the actual Vidalia price for the year but is priced at that year’s average price paid by Entergy Louisiana for the exchange of electric energy under Service Schedule MSS-3 of the System Agreement, thereby reducing the amount of Vidalia costs reflected in the comparison of the Utility operating companies’ total production costs.
The remedy ordered by the FERC in 2005 required no refunds and became effective based on calendar year 2006 production costs and the first reallocation payments were made in 2007.
The FERC’s decision reallocated total production costs of the Utility operating companies whose relative total production costs expressed as a percentage of Entergy System average production costs are outside an upper or lower bandwidth.  This was accomplished by payments from Utility operating companies whose production costs were more than 11% below Entergy System average production costs to Utility operating companies whose production costs were more than the Entergy System average production cost, with payments going first to those Utility operating companies whose total production costs were farthest above the Entergy System average.

The LPSC, APSC, MPSC, and the Arkansas Electric Energy Consumers appealed the FERC’s December 2005 decision to the United States Court of Appeals for the D.C. Circuit.  Entergy and the City of New Orleans intervened in the various appeals.  The D.C. Circuit issued its decision in April 2008.  The D.C. Circuit concluded that the FERC’s orders had failed to adequately explain both its conclusion that it was prohibited from ordering refunds for the 20-month period from September 13, 2001 - May 2, 2003 and its determination to implement the bandwidth remedy commencing on January 1, 2006, rather than June 1, 2005.  The D.C. Circuit remanded the case to the FERC for further proceedings on those two issues.

In October 2011 the FERC issued an order addressing the D.C. Circuit remand on the two issues.  On the first issue, the FERC concluded that it did have the authority to order refunds, but decided that it would exercise its equitable discretion and not require refunds for the 20-month period from September 13, 2001 - May 2, 2003.  Because the ruling on refunds relied on findings in the interruptible load proceeding, which is discussed in a separate section below, the FERC concluded that this refund ruling will be held in abeyance pending the outcome of the rehearing requests in the interruptible load proceeding.  On the second issue, the FERC reversed its prior decision and ordered that the prospective bandwidth remedy begin on June 1, 2005 (the date of its initial order in the proceeding) rather than January 1, 2006, as it had previously ordered.  Pursuant to the October 2011 order, Entergy was required to calculate bandwidth payments for the period June - December 2005 utilizing the bandwidth formula tariff prescribed by the FERC that was filed in a December 2006 compliance filing and accepted by the FERC in an April 2007 order.  

In March 2015, in light of a December 2014 decision by the D.C. Circuit in the interruptible load proceeding, Entergy filed with the FERC a motion to establish a briefing schedule on refund issues and an initial brief addressing refund issues. The initial brief argued that the FERC, in response to the D.C. Circuit decision, should clarify its policy on refunds and find that refunds are not required in this proceeding. In October 2015 the FERC issued three orders related to the commencement of the remedy on June 1, 2005 and the inclusion of interest for the period June 1, 2005 through December 31, 2005. Specifically, the FERC rejected Entergy’s request for rehearing of its decision to include interest for the seven-month period. The FERC also rejected Entergy’s request for rehearing of the order rejecting the compliance filing with regard to the issue of interest. Finally, the FERC set for hearing and settlement procedures the 2014 compliance filing that included the bandwidth calculation for the seven months June 1, 2005 through December 31, 2005. In setting the compliance filing for hearing, the FERC rejected the APSC’s protest that Entergy Arkansas should not be subject to the filing because Entergy Arkansas would be making the payments during a period following its exit from the System Agreement. In January 2018 the D.C.Circuit affirmed the FERC decision that Entergy Arkansas was subject to the filing.

In December 2011, Entergy filed with the FERC its compliance filing that provides the payments and receipts among the Utility operating companies pursuant to the FERC’s October 2011 order.  The APSC, the LPSC, the PUCT, and other parties intervened in the December 2011 compliance filing proceeding, and the APSC and the LPSC also filed protests. The filing shows the following payments/receipts among the Utility operating companies:

 
Payments (Receipts)
 
(In Millions)
Entergy Arkansas
$156
Entergy Louisiana
($75)
Entergy Mississippi
($33)
Entergy New Orleans
($5)
Entergy Texas
($43)


Entergy Arkansas made its payment in January 2012.  In February 2012, Entergy Arkansas filed for an interim adjustment to its production cost allocation rider requesting that the $156 million be collected from customers over the 22-month period from March 2012 through December 2013.  In March 2012 the APSC issued an order stating that the payment can be recovered from retail customers through the production cost allocation rider, subject to refund.  The LPSC and the APSC requested rehearing of the FERC’s October 2011 order.  

In February 2014 the FERC issued a rehearing order addressing its October 2011 order. The FERC denied the LPSC’s request for rehearing on the issues of whether the bandwidth remedy should be made effective earlier than June 1, 2005, and whether refunds should be ordered for the 20-month refund effective period. The FERC granted the LPSC’s rehearing request on the issue of interest on the bandwidth payments/receipts for the June - December 2005 period, requiring that interest be accrued from June 1, 2006 until the date those bandwidth payments/receipts are made. Also in February 2014 the FERC issued an order rejecting the December 2011 compliance filing that calculated the bandwidth payments/receipts for the June - December 2005 period. The FERC order required a new compliance filing that calculates the bandwidth payments/receipts for the June - December 2005 period based on monthly data for the seven individual months including interest pursuant to the February 2014 rehearing order. Entergy sought rehearing of the February 2014 order with respect to the FERC’s determinations regarding interest. In April 2014 the LPSC filed a petition for review of the FERC’s October 2011 and February 2014 orders with the U.S. Court of Appeals for the D.C. Circuit. In August 2017 the D.C. Circuit issued a decision addressing the LPSC’s appeal of the FERC’s October 2011 and February 2014 orders. On the issue of the FERC’s implementation of the prospective remedy as of June 2005 and whether the bandwidth remedy should be extended for an additional 17 months in years 2004-2005, the D.C. Circuit affirmed the FERC’s implementation of the remedy and denied the LPSC’s appeal. On the issue of whether the operating companies should be required to issue refunds for the 20-month period from September 2001 to May 2003, the D.C. Circuit granted the FERC’s request for agency reconsideration and remanded that issue back to the FERC for further proceedings as requested by all parties to the appeal.

In April and May 2014, Entergy filed with the FERC an updated compliance filing that provides the payments and receipts among the Utility operating companies pursuant to the FERC’s February 2014 orders.  The filing shows the following net payments and receipts, including interest, among the Utility operating companies:
 
Payments (Receipts)
 
(In Millions)
Entergy Arkansas
$68
Entergy Louisiana
($10)
Entergy Mississippi
($11)
Entergy New Orleans
$2
Entergy Texas
($49)

These payments were made in May 2014. The LPSC, City Council, and APSC filed protests.

The hearing on the bandwidth calculation for the seven months June 1, 2005 through December 31, 2005 occurred in July 2016. The presiding judge issued an initial decision in November 2016. In the initial decision, the presiding judge agreed with the Utility operating companies’ position that: (1) interest on the bandwidth payments for the 2005 test period should be accrued from June 1, 2006 until the date that the bandwidth payments for that calculation are paid, which is consistent with how the Utility operating companies performed the calculation; and (2) a portion of Entergy Louisiana’s 2001-vintage Louisiana state net operating loss accumulated deferred income tax that results from the Vidalia tax deduction should be excluded from the 2005 test period bandwidth calculation. Various participants filed briefs on exceptions and/or briefs opposing exceptions related to the initial decision, including the LPSC, the APSC, the FERC trial staff, and Entergy Services. The initial decision is pending before the FERC.

Rough Production Cost Equalization Rates

Each May from 2007 through 2016 Entergy filed with the FERC the rates to implement the FERC’s orders in the System Agreement proceeding.  These filings showed the following payments/receipts among the Utility operating companies were necessary to achieve rough production cost equalization as defined by the FERC’s orders:
 
Payments (Receipts)
 
2007
 
2008
 
2009
 
2010
 
2011
 
2012
 
2013
 
2014
 
(In Millions)
Entergy Arkansas

$252

 

$252

 

$390

 

$41

 

$77

 

$41

 

$—

 

$—

Entergy Louisiana

($211
)
 

($160
)
 

($247
)
 

($22
)
 

($12
)
 

($41
)
 

$—

 

$—

Entergy Mississippi

($41
)
 

($20
)
 

($24
)
 

($19
)
 

($40
)
 

$—

 

$—

 

$—

Entergy New Orleans

$—

 

($7
)
 

$—

 

$—

 

($25
)
 

$—

 

($15
)
 

($15
)
Entergy Texas

($30
)
 

($65
)
 

($119
)
 

$—

 

$—

 

$—

 

$15

 

$15



The Utility operating companies recorded accounts payable or accounts receivable to reflect the rough production cost equalization payments and receipts required to implement the FERC’s remedy.  When accounts payable were recorded, a corresponding regulatory asset was recorded for the right to collect the payments from customers. When accounts receivable were recorded, a corresponding regulatory liability was recorded for the obligations to pass the receipts on to customers.  No payments were required in 2016 or 2015 to implement the FERC’s remedy based on calendar year 2015 production costs and 2014 production costs, respectively. The System Agreement terminated in August 2016.

The APSC approved a production cost allocation rider for recovery from customers of the retail portion of the costs allocated to Entergy Arkansas.  Entergy Texas recovered its 2013 rough production cost equalization payment over three years beginning April 2014. Entergy Texas included its 2014 rough production cost equalization payment as a component of an interim fuel refund made in 2014. Management believes that any changes in the allocation of production costs resulting from the FERC’s decision and related retail proceedings should result in similar rate changes for retail customers, subject to specific circumstances that have caused trapped costs.

The following rough production cost equalization rate proceedings are still ongoing.

2010 Rate Filing Based on Calendar Year 2009 Production Costs

In May 2010, Entergy filed with the FERC the 2010 rates in accordance with the FERC’s orders in the System Agreement proceeding, and supplemented the filing in September 2010.  Several parties intervened in the proceeding at the FERC, including the LPSC and the City Council, which also filed protests.  In July 2010 the FERC accepted Entergy’s proposed rates for filing, effective June 1, 2010, subject to refund.  After an abeyance of the proceeding schedule, a hearing was held in March 2014 and in December 2015 the FERC issued an order. Among other things, the December 2015 order directed Entergy to submit a compliance filing. In January 2016 the LPSC, the APSC, and Entergy filed requests for rehearing of the FERC’s December 2015 order. In February 2016, Entergy submitted the compliance filing ordered in the December 2015 order.  The result of the true-up payments and receipts for the recalculation of production costs resulted in the following payments/receipts among the Utility operating companies:
 
Payments (Receipts)
 
(In Millions)
Entergy Arkansas
$2
Entergy Louisiana
$6
Entergy Mississippi
($4)
Entergy New Orleans
($1)
Entergy Texas
($3)

 
In September 2016 the FERC accepted the February 2016 compliance filing subject to a further compliance filing made in November 2016. The further compliance filing was required as a result of an order issued in September 2016 ruling on the January 2016 rehearing requests filed by the LPSC, the APSC, and Entergy. In the order addressing the rehearing requests, the FERC granted the LPSC’s rehearing request and directed that interest be calculated on the payment/receipt amounts. The FERC also granted the APSC’s and Entergy’s rehearing request and ordered the removal of both securitized asset accumulated deferred income taxes and contra-securitization accumulated deferred income taxes from the calculation. In November 2016, Entergy submitted its compliance filing in response to the FERC’s order on rehearing. The compliance filing included a revised refund calculation of the true-up payments and receipts based on 2009 test year data and interest calculations. The LPSC protested the interest calculations. In November 2017 the FERC issued an order rejecting the November 2016 compliance filing. The FERC determined that the payments detailed in the November 2016 compliance filing did not include adequate interest for the payments from Entergy Arkansas to Entergy Louisiana because it did not include interest on the principal portion of the payment that was made in February 2016. In December 2017, Entergy recalculated the interest pursuant to the November 2017 order. As a result of the recalculations, Entergy Arkansas owed very minor payments to Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans.

2011 Rate Filing Based on Calendar Year 2010 Production Costs

In May 2011, Entergy filed with the FERC the 2011 rates in accordance with the FERC’s orders in the System Agreement proceeding.  Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest.  In July 2011 the FERC accepted Entergy’s proposed rates for filing, effective June 1, 2011, subject to refund. After an abeyance of the proceeding schedule, in December 2014 the FERC consolidated the 2011 rate filing with the 2012, 2013, and 2014 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

2012 Rate Filing Based on Calendar Year 2011 Production Costs

In May 2012, Entergy filed with the FERC the 2012 rates in accordance with the FERC’s orders in the System Agreement proceeding.  Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest.  In August 2012 the FERC accepted Entergy’s proposed rates for filing, effective June 2012, subject to refund. After an abeyance of the proceeding schedule, in December 2014 the FERC consolidated the 2012 rate filing with the 2011, 2013, and 2014 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

2013 Rate Filing Based on Calendar Year 2012 Production Costs

In May 2013, Entergy filed with the FERC the 2013 rates in accordance with the FERC’s orders in the System Agreement proceeding. Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest. The City Council intervened and filed comments related to including the outcome of a related FERC proceeding in the 2013 cost equalization calculation. In August 2013 the FERC issued an order accepting the 2013 rates, effective June 1, 2013, subject to refund. After an abeyance of the proceeding schedule, in December 2014 the FERC consolidated the 2013 rate filing with the 2011, 2012, and 2014 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

2014 Rate Filing Based on Calendar Year 2013 Production Costs

In May 2014, Entergy filed with the FERC the 2014 rates in accordance with the FERC’s orders in the System Agreement proceeding. Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest. The City Council intervened and filed comments. In December 2014 the FERC issued an order accepting the 2014 rates, effective June 1, 2014, subject to refund, set the proceeding for hearing procedures, and consolidated the 2014 rate filing with the 2011, 2012, and 2013 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

Consolidated 2011, 2012, 2013, and 2014 Rate Filing Proceedings

As discussed above, in December 2014 the FERC consolidated the 2011, 2012, 2013, and 2014 rate filings for settlement and hearing procedures. In May 2015, Entergy filed direct testimony in the consolidated rate filings and the LPSC filed direct testimony concerning its complaint proceeding that is consolidated with the rate filings, challenging certain components of the pending bandwidth calculations for prior years. Hearings occurred in November 2015, and the ALJ issued an initial decision in July 2016. In the initial decision, the ALJ generally agreed with Entergy’s bandwidth calculations with one exception on the accounting related to the Waterford 3 sale/leaseback. Briefs were filed in September 2016 and the proceeding is pending.

Utility Operating Company Termination of System Agreement Participation

Entergy Arkansas and Entergy Mississippi ceased participating in the System Agreement effective December 18, 2013 and November 7, 2015, respectively. Entergy Louisiana, Entergy New Orleans, and Entergy Texas terminated participation in the System Agreement on August 31, 2016, which resulted in the termination of the System Agreement in its entirety pursuant to a settlement agreement approved by the FERC in December 2015.

In December 2013 the FERC set one issue for hearing involving whether and how the benefits associated with settlement with Union Pacific regarding certain coal delivery issues should be allocated among Entergy Arkansas and the other Utility operating companies post-termination of the System Agreement. In December 2014 a FERC ALJ issued an initial decision finding that Entergy Arkansas would realize benefits after December 18, 2013 from the 2008 settlement agreement between Entergy Services, Entergy Arkansas, and Union Pacific, related to certain coal delivery issues. The ALJ further found that all of the Utility operating companies should share in those benefits pursuant to a methodology proposed by the MPSC. The Utility operating companies and other parties to the proceeding filed briefs on exceptions and/or briefs opposing exceptions with the FERC challenging various aspects of the December 2014 initial decision. In March 2016 the FERC issued an opinion affirming the December 2014 initial decision with regard to the determination that there were benefits related to the Union Pacific settlement, which were realized post-Entergy Arkansas’s December 2013 withdrawal from the System Agreement, that should be shared with the other Utility operating companies utilizing the methodology proposed by the MPSC and trued-up to actual coal volumes purchased. In May 2016, Entergy made a compliance filing that provided the calculation of Union Pacific settlement benefits utilizing the methodology adopted by the initial decision, trued-up for the actual volumes of coal purchased. The payments were made in May 2016. In August 2016 the FERC issued an order accepting Entergy’s compliance filing. Also in August 2016 the APSC filed a petition for review of the FERC’s March 2016 and August 2016 orders with the U.S. Court of Appeals for the D.C. Circuit. Oral argument before the D.C. Circuit was held on the APSC’s petition in January 2018 and a decision is pending.

In connection with the System Agreement termination settlement agreement, the purchase power agreements, referred to as the jurisdictional separation plan PPAs, between Entergy Texas and Entergy Gulf States Louisiana that were put in place for certain legacy gas units at the time of Entergy Gulf States’s separation into Entergy Texas and Entergy Gulf States Louisiana terminated effective with the System Agreement termination. Similarly, the purchase power agreement between Entergy Gulf States Louisiana and Entergy Texas for the Calcasieu unit also terminated. In March 2016, Entergy Services filed with the FERC the notices of termination. The jurisdictional separation plan PPAs were the means by which Entergy Texas received payment for its receivable associated with Entergy Louisiana’s Spindletop gas storage facility regulatory asset. As a result of the System Agreement termination settlement agreement, effective with the termination date, Entergy Texas no longer receives payments from Entergy Louisiana related to the Spindletop storage facility, which resulted in a write-off recorded in 2015 by Entergy Texas of $23.5 million ($15.3 million net-of-tax). Upon termination of the System Agreement, other purchase power agreements entered into under Service Schedule MSS-4 of the System Agreement were replaced with updated agreements under a FERC-jurisdictional tariff effective September 1, 2016.

Interruptible Load Proceeding

In April 2007 the U.S. Court of Appeals for the D.C. Circuit issued its opinion in the LPSC’s appeal of the FERC’s March 2004 and April 2005 orders related to the treatment under the System Agreement of the Utility operating companies’ interruptible loads.  In its opinion the D.C. Circuit concluded that the FERC: (1) acted arbitrarily and capriciously by allowing the Utility operating companies to phase-in the effects of the elimination of the interruptible load over a 12-month period of time; (2) failed to adequately explain why refunds could not be ordered under Section 206(c) of the Federal Power Act; and (3) exercised appropriately its discretion to defer addressing the cost of sulfur dioxide allowances until a later time.  The D.C. Circuit remanded the matter to the FERC for a more considered determination on the issue of refunds.  The FERC issued its order on remand in September 2007, in which it directed Entergy to make a compliance filing removing all interruptible load from the computation of peak load responsibility commencing April 1, 2004 and to issue any necessary refunds to reflect this change.  In addition, the order directed the Utility operating companies to make refunds for the period May 1995 through July 1996.  In November 2007 the Utility operating companies filed a refund report describing the refunds to be issued pursuant to the FERC’s orders.  The LPSC filed a protest to the refund report in December 2007, and the Utility operating companies filed an answer to the protest in January 2008.  The refunds were made in October 2008 by the Utility operating companies that owed refunds to the Utility operating companies that were due refunds under the decision.  The APSC and the Utility operating companies appealed the FERC decisions to the D.C. Circuit.

Following the filing of petitioners’ initial briefs, the FERC filed a motion requesting the D.C. Circuit hold the appeal of the FERC’s decisions ordering refunds in the interruptible load proceeding in abeyance and remand the record to the FERC.  The D.C. Circuit granted the FERC’s unopposed motion in June 2009.  In December 2009 the FERC established a paper hearing to determine whether the FERC had the authority and, if so, whether it would be appropriate to order refunds resulting from changes in the treatment of interruptible load in the allocation of capacity costs by the Utility operating companies.  In August 2010 the FERC issued an order stating that it has the authority and refunds are appropriate.  The APSC, the MPSC, and Entergy requested rehearing of the FERC’s decision.  In June 2011 the FERC issued an order granting rehearing in part and denying rehearing in part, in which the FERC determined to invoke its discretion to deny refunds.  The FERC held that in this case where “the Entergy system as a whole collected the proper level of revenue, but, as was later established, incorrectly allocated peak load responsibility among the various Entergy operating companies….the Commission will apply here our usual practice in such cases, invoking our equitable discretion to not order refunds, notwithstanding our authority to do so.”  The LPSC has requested rehearing of the FERC’s June 2011 decision.  In July 2011 the refunds made in the fourth quarter 2009 described above were reversed. In October 2011 the FERC issued an “Order Establishing Paper Hearing” inviting parties that oppose refunds to file briefs within 30 days addressing the LPSC’s argument that FERC precedent supports refunds under the circumstances present in this proceeding.  Parties that favor refunds were then invited to file reply briefs within 21 days of the date that the initial briefs were due.  

In September 2010 the FERC had issued an order setting the refund report filed in the proceeding in November 2007 for hearing and settlement judge procedures.  In May 2011, Entergy filed a settlement agreement that resolved all issues relating to the refund report set for hearing.  In June 2011 the settlement judge certified the settlement as uncontested.  The settlement agreement was approved by the FERC in September 2016.

Prior to the FERC’s June 2011 order on rehearing, Entergy Arkansas filed an application in November 2010 with the APSC for recovery of the refund that it paid.  The APSC denied Entergy Arkansas’s application, and also denied Entergy Arkansas’s petition for rehearing.  If the FERC were to order Entergy Arkansas to pay refunds on rehearing in the interruptible load proceeding the APSC’s decision would trap FERC-approved costs at Entergy Arkansas with no regulatory-approved mechanism to recover them.  In August 2011, Entergy Arkansas filed a complaint in the United States District Court for the Eastern District of Arkansas asking for a declaratory judgment that the rejection of Entergy Arkansas’s application by the APSC is preempted by the Federal Power Act.  The APSC filed a motion to dismiss the complaint.  In April 2012 the United States district court dismissed Entergy Arkansas’s complaint without prejudice stating that Entergy Arkansas’s claim is not ripe for adjudication and that Entergy Arkansas did not have standing to bring suit at this time.

In March 2013 the FERC issued an order denying the LPSC’s request for rehearing of the FERC’s June 2011 order wherein the FERC concluded it would exercise its discretion and not order refunds in the interruptible load proceeding. Based on its review of the LPSC’s request for rehearing and the briefs filed as part of the paper hearing established in October 2011, the FERC affirmed its earlier ruling and declined to order refunds under the circumstances of the case. In May 2013 the LPSC filed a petition for review with the U.S. Court of Appeals for the D.C. Circuit seeking review of FERC prior orders in the interruptible load proceeding that concluded that the FERC would exercise its discretion and not order refunds in the proceeding. Oral argument was held on the appeal in the D.C. Circuit in September 2014. In December 2014 the D.C. Circuit issued an order on the LPSC’s appeal and remanded the case back to the FERC. The D.C. Circuit rejected the LPSC’s argument that there is a presumption in favor of refunds, but it held that the FERC had not adequately explained its decision to deny refunds and directed the FERC “to consider the relevant factors and weigh them against one another.” In March 2015, Entergy filed with the FERC a motion to establish a briefing schedule on remand and an initial brief on remand to address the December 2014 decision by the D.C. Circuit. The initial brief on remand argued that the FERC, in response to the D.C. Circuit decision, should clarify its policy on refunds and find that refunds are not required in the interruptible load proceeding.

In April 2016 the FERC issued an order on remand that addressed the December 2014 decision by the D.C. Circuit in the interruptible load proceeding. The order on remand affirmed the FERC’s denial of refunds for the 15-month refund effective period. The FERC explained and clarified its policies regarding refunds and concluded that the evidence in the record demonstrated that the relevant equitable factors favored not requiring refunds in this case. The FERC also noted that, under Section 206(c) of the Federal Power Act, in a Section 206 proceeding involving two or more electric utility companies of a registered holding company system, the FERC may order refunds only if it determines the refunds would not cause the registered holding company to experience any reduction in revenues resulting from an inability of an electric utility company in the system to recover the resulting increase in costs. The FERC stated it was not able to find that the Entergy system would not experience a reduction in revenues if refunds were awarded in this proceeding, which further supported the denial of refunds. In May 2016 the LPSC filed a request for rehearing of the FERC’s April 2016 order. In September 2016 the FERC issued an order denying the LPSC’s request for rehearing and reaffirming its denial of refunds for the 15-month refund effective period. The LPSC has appealed the April and September 2016 orders to the U.S. Court of Appeals for the D.C. Circuit. Oral argument before the D.C. Circuit was held before the D.C. Circuit in February 2018 and a decision is pending.
 
Entergy Arkansas Opportunity Sales Proceeding

In June 2009 the LPSC filed a complaint requesting that the FERC determine that certain of Entergy Arkansas’s sales of electric energy to third parties: (a) violated the provisions of the System Agreement that allocated the energy generated by Entergy System resources; (b) imprudently denied the Entergy System and its ultimate consumers the benefits of low-cost Entergy System generating capacity; and (c) violated the provision of the System Agreement that prohibited sales to third parties by individual companies absent an offer of a right-of-first-refusal to other Utility operating companies.   The LPSC’s complaint challenged sales made beginning in 2002 and requested refunds.  In July 2009 the Utility operating companies filed a response to the complaint requesting that the FERC dismiss the complaint on the merits without hearing because the LPSC has failed to meet its burden of showing any violation of the System Agreement and failed to produce any evidence of imprudent action by the Entergy System.  In their response, the Utility operating companies explained that the System Agreement clearly contemplates that the Utility operating companies may make sales to third parties for their own account, subject to the requirement that those sales be included in the load (or load shape) for the applicable Utility operating company.  The FERC subsequently ordered a hearing in the proceeding.

The LPSC filed direct testimony in the proceeding alleging, among other things, (1) that Entergy violated the System Agreement by permitting Entergy Arkansas to make non-requirements sales to non-affiliated third parties rather than making such energy available to the other Utility operating companies’ customers; and (2) that over the period 2000 - 2009, these non-requirements sales caused harm to the Utility operating companies’ customers and these customers should be compensated for this harm by Entergy.  In subsequent testimony, the LPSC modified its original damages claim in favor of quantifying damages by re-running intra-system bills.  The Utility operating companies believe the LPSC’s allegations are without merit.  A hearing in the matter was held in August 2010.

In December 2010 the ALJ issued an initial decision.  The ALJ found that the System Agreement allowed for Entergy Arkansas to make the sales to third parties but concluded that the sales should be accounted for in the same manner as joint account sales.  The ALJ concluded that “shareholders” should make refunds of the damages to the Utility operating companies, along with interest.  Entergy disagreed with several aspects of the ALJ’s initial decision and in January 2011 filed with the FERC exceptions to the decision.

The FERC issued a decision in June 2012 and held that, while the System Agreement is ambiguous, it does provide authority for individual Utility operating companies to make opportunity sales for their own account and Entergy Arkansas made and priced these sales in good faith.  The FERC found, however, that the System Agreement does not provide authority for an individual Utility operating company to allocate the energy associated with such opportunity sales as part of its load, but provides a different allocation authority.  The FERC further found that the after-the-fact accounting methodology used to allocate the energy used to supply the sales was inconsistent with the System Agreement.  Quantifying the effect of the FERC’s decision requires re-running intra-system bills for a ten-year period, and the FERC in its decision established further hearing procedures to determine the calculation of the effects.  In July 2012, Entergy and the LPSC filed requests for rehearing of the FERC’s June 2012 decision. A hearing was held in May 2013 to quantify the effect of repricing the opportunity sales in accordance with the FERC’s June 2012 decision.

In August 2013 the presiding judge issued an initial decision in the calculation proceeding. The initial decision concluded that the methodology proposed by the LPSC, rather than the methodologies proposed by Entergy or the FERC Staff, should be used to calculate the payments that Entergy Arkansas is to make to the other Utility operating companies. The initial decision also concluded that the other System Agreement service schedules should not be adjusted and that payments by Entergy Arkansas should not be reflected in the rough production cost equalization bandwidth calculations for the applicable years. The initial decision recognized that the LPSC’s methodology would result in an inequitable windfall to the other Utility operating companies and, therefore, concluded that any payments by Entergy Arkansas should be reduced by 20%. The LPSC, the APSC, the City Council, and FERC staff filed briefs on exceptions and/or briefs opposing exceptions. Entergy filed a brief on exceptions requesting that the FERC reverse the initial decision and a brief opposing certain exceptions taken by the LPSC and FERC staff.

In April 2016 the FERC issued orders addressing requests for rehearing filed in July 2012 and the ALJ’s August 2013 initial decision. The first order denied Entergy’s request for rehearing and affirmed the FERC’s earlier rulings that Entergy’s original methodology for allocating energy costs to the opportunity sales was incorrect and, as a result, Entergy Arkansas must make payments to the other Utility operating companies to put them in the same position that they would have been in absent the incorrect allocation. The FERC clarified that interest should be included with the payments. The second order affirmed in part, and reversed in part, the rulings in the ALJ’s August 2013 initial decision regarding the methodology that should be used to calculate the payments Entergy Arkansas is to make to the other Utility operating companies. The FERC affirmed the ALJ’s ruling that a full re-run of intra-system bills should be performed, but required that methodology be modified so that the sales have the same priority for purposes of energy allocation as joint account sales. The FERC reversed the ALJ’s decision that any payments by Entergy Arkansas should be reduced by 20%. The FERC also reversed the ALJ’s decision that adjustments to other System Agreement service schedules and excess bandwidth payments should not be taken into account when calculating the payments to be made by Entergy Arkansas. The FERC held that such adjustments and excess bandwidth payments should be taken into account, but ordered further proceedings before an ALJ to address whether a cap on any reduction due to bandwidth payments was necessary and to implement the other adjustments to the calculation methodology.

In May 2016, Entergy Services filed a request for rehearing of the FERC’s April 2016 order arguing that payments made by Entergy Arkansas should be reduced as a result of the timing of the LPSC’s approval of certain contracts. Entergy Services also filed a request for clarification and/or rehearing of the FERC’s April 2016 order addressing the ALJ’s August 2013 initial decision. The APSC and the LPSC also filed requests for rehearing of the FERC’s April 2016 order. In September 2017 the FERC issued an order denying the request for rehearing on the issue of whether any payments by Entergy Arkansas to the other Utility operating companies should be reduced due to the timing of the LPSC’s approval of Entergy Arkansas’s wholesale baseload contract with Entergy Louisiana. In November 2017 the FERC issued an order denying all of the remaining requests for rehearing of the April 2016 order. In November 2017, Entergy Services filed a petition for review in the D.C. Circuit of the FERC’s orders in the first two phases of the opportunity sales case. In December 2017 the D.C. Circuit granted Entergy Services’s request to hold the appeal in abeyance pending final resolution of the related proceeding still pending with the FERC. In January 2018 the APSC and the LPSC filed separate petitions for review in the D.C. Circuit, and the D.C. Circuit consolidated the appeals with Entergy Services’s appeal and held all of the appeals in abeyance.

Pursuant to the procedural schedule established in the case, Entergy Services re-ran intra-system bills for the ten-year period 2000-2009 to quantify the effects of the FERC's ruling. In November 2016 the LPSC submitted testimony disputing certain aspects of the calculations. A hearing was held in May 2017. In July 2017, the ALJ issued an initial decision concluding that Entergy Arkansas should pay $86 million plus interest to the other Utility operating companies. In August 2017 the Utility operating companies, the LPSC, the APSC, and FERC staff filed individual briefs on exceptions challenging various aspects of the initial decision. In September 2017 the Utility operating companies, the LPSC, the APSC, the MPSC, the City Council, and FERC staff filed separate briefs opposing exceptions taken by various parties. The case is pending before the FERC. No payments will be made or received by the Utility operating companies until the FERC issues an order reviewing the initial decision and Entergy submits a subsequent filing to comply with that order.

The effect of the FERC’s decisions thus far in the case would be that Entergy Arkansas will make payments to some or all of the other Utility operating companies. Because further proceedings will still occur in the case, the amount and recipients of payments by Entergy Arkansas are unknown at this time. Based on testimony previously submitted in the case and its assessment of the April 2016 FERC orders, in the first quarter 2016, Entergy Arkansas recorded a liability of $87 million, which includes interest, for its estimated increased costs and payment to the other Utility operating companies. This estimate is subject to change depending on how the FERC resolves the issues that are still outstanding in the case, including its review of the July 2017 initial decision. Entergy Arkansas’s increased costs will be attributed to Entergy Arkansas’s retail and wholesale businesses, and it is not probable that Entergy Arkansas will recover the wholesale portion. Entergy Arkansas, therefore, recorded a deferred fuel regulatory asset in the first quarter 2016 of approximately $75 million, which represents its estimate of the retail portion of the costs. Following its assessment of the course of the proceedings, including the FERC’s denial of rehearing in November 2017 described above, in the fourth quarter 2017, Entergy Arkansas recorded an additional liability of $35 million and a regulatory asset of $31 million. Because management currently expects to recover the retail portion of the costs through a base rate proceeding or newly proposed rider, the regulatory asset is reflected as Other regulatory assets as of December 31, 2017.
    
Complaint Against System Energy

In January 2017 the APSC and MPSC filed a complaint with the FERC against System Energy. The complaint seeks a reduction in the return on equity component of the Unit Power Sales Agreement pursuant to which System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. Entergy Arkansas also sells some of its Grand Gulf capacity and energy to Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under separate agreements. The current return on equity under the Unit Power Sales Agreement is 10.94%. The complaint alleges that the return on equity is unjust and unreasonable because current capital market and other considerations indicate that it is excessive. The complaint requests the FERC to institute proceedings to investigate the return on equity and establish a lower return on equity, and also requests that the FERC establish January 23, 2017 as a refund effective date. The complaint includes return on equity analysis that purports to establish that the range of reasonable return on equity for System Energy is between 8.37% and 8.67%. System Energy answered the complaint in February 2017 and disputes that a return on equity of 8.37% to 8.67% is just and reasonable. The LPSC and the City Council intervened in the proceeding expressing support for the complaint. System Energy is recording a provision against revenue for the potential outcome of this proceeding. In September 2017 the FERC established a refund effective date of January 23, 2017, consolidated the return on equity complaint with the proceeding described in Unit Power Sales Agreement below, and directed the parties to engage in settlement proceedings before an ALJ. If the parties fail to come to an agreement during settlement proceedings, a prehearing conference will be held to establish a procedural schedule for hearing proceedings.

Unit Power Sales Agreement

In August 2017, System Energy submitted to the FERC proposed amendments to the Unit Power Sales Agreement pursuant to which System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. The filing proposes limited amendments to the Unit Power Sales Agreement to adopt (1) updated rates for use in calculating Grand Gulf plant depreciation and amortization expenses and (2) updated nuclear decommissioning cost annual revenue requirements, both of which are recovered through the Unit Power Sales Agreement rate formula. The proposed amendments would result in lower charges to the Utility operating companies that buy capacity and energy from System Energy under the Unit Power Sales Agreement. The proposed changes are based on updated depreciation and nuclear decommissioning studies that take into account the renewal of Grand Gulf’s operating license for a term through November 1, 2044. System Energy requested that the FERC accept the amendments effective October 1, 2017.

In September 2017 the FERC accepted System Energy’s proposed Unit Power Sales Agreement amendments, subject to further proceedings to consider the justness and reasonableness of the amendments. Because the amendments propose a rate decrease, the FERC also initiated an investigation under Section 206 of the Federal Power Act to determine if the rate decrease should be lower than proposed. The FERC accepted the proposed amendments effective October 1, 2017, subject to refund pending the outcome of the further settlement and/or hearing proceedings, and established a refund effective date of October 11, 2017 with respect to the rate decrease. The FERC also consolidated the Unit Power Sales Agreement amendment proceeding with the proceeding described in Complaint Against System Energy above, and directed the parties to engage in settlement proceedings before an ALJ. If the parties fail to come to an agreement during settlement proceedings, a prehearing conference will be held to establish a procedural schedule for hearing proceedings.

Storm Cost Recovery Filings with Retail Regulators

Entergy Louisiana

Hurricane Isaac

In August 2012, Hurricane Isaac caused extensive damage to Entergy Louisiana’s service area.  The storm resulted in widespread power outages, significant damage primarily to distribution infrastructure, and the loss of sales during the power outages.  In June 2014 the LPSC authorized Entergy Louisiana to utilize Louisiana Act 55 financing for Hurricane Isaac system restoration costs.  Entergy Louisiana committed to pass on to customers a minimum of $30.8 million of customer benefits through annual customer credits of approximately $6.2 million for five years. Approvals for the Act 55 financings were obtained from the Louisiana Utilities Restoration Corporation (LURC) and the Louisiana State Bond Commission.

In August 2014 the Louisiana Local Government Environmental Facilities and Community Development Authority (LCDA) issued $314.85 million in bonds under Louisiana Act 55.  From the $309 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $16 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $293 million directly to Entergy Louisiana.  Entergy Louisiana used the $293 million received from the LURC to acquire 2,935,152.69 Class C preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 7.5% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2014, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement. The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1.75 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC, and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

Hurricane Gustav and Hurricane Ike

In September 2008, Hurricane Gustav and Hurricane Ike caused catastrophic damage to Entergy Louisiana’s service territory.  In December 2009, Entergy Louisiana entered into a stipulation agreement with the LPSC staff regarding its storm costs.  In March and April 2010, Entergy Louisiana and other parties to the proceeding filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal to utilize Act 55 financing, which included a commitment to pass on to customers a minimum of $43.3 million of customer benefits through a prospective annual rate reduction of $8.7 million for five years.  In April 2010 the LPSC approved the settlement and subsequently issued financing orders and a ratemaking order intended to facilitate the implementation of the Act 55 financings.  In June 2010 the Louisiana State Bond Commission approved the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricane Gustav and Hurricane Ike was reduced by $2.7 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2010, the LCDA issued two series of bonds totaling $713.0 million under Act 55.  From the $702.7 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $290 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $412.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana used $412.7 million to acquire 4,126,940.15 Class B preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 9% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2010, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA, and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC, and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.
Hurricane Katrina and Hurricane Rita

In August and September 2005, Hurricanes Katrina and Rita caused catastrophic damage to Entergy Louisiana’s service territory. In March 2008, Entergy Louisiana and the LURC filed at the LPSC an application requesting that the LPSC grant a financing order authorizing the financing of Entergy Louisiana storm costs, storm reserves, and issuance costs pursuant to Louisiana Act 55.  The Louisiana Act 55 financing is expected to produce additional customer benefits as compared to traditional securitization.  Entergy Louisiana also filed an application requesting LPSC approval for ancillary issues including the mechanism to flow charges and savings to customers via a storm cost offset rider.  In April 2008 the Louisiana Public Facilities Authority (LPFA), which is the issuer of the bonds pursuant to the Act 55 financing, approved requests for the Act 55 financing.  Also in April 2008, Entergy Louisiana and the LPSC staff filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal under the Act 55 financing, which included a commitment to pass on to customers a minimum of $40 million of customer benefits through a prospective annual rate reduction of $8 million for five years.  The LPSC subsequently approved the settlement and issued two financing orders and one ratemaking order intended to facilitate implementation of the Act 55 financing.  In May 2008 the Louisiana State Bond Commission granted final approval of the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricanes Katrina and Rita was reduced by $22.3 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2008 the LPFA issued $687.7 million in bonds under the aforementioned Act 55.  From the $679 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $152 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $527 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $545 million, including $17.8 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 5,449,861.85 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 10% annual distribution rate.  In August 2008, the LPFA issued $278.4 million in bonds under the aforementioned Act 55.  From the $274.7 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $87 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $187.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $189.4 million, including $1.7 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 1,893,918.39 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC that carry a 10% annual distribution rate.  Distributions are payable quarterly commencing on September 15, 2008 and have a liquidation price of $100 per unit.  The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.  In February 2012, Entergy Louisiana sold 500,000 of its Class A preferred membership units in Entergy Holdings Company LLC, a wholly-owned Entergy subsidiary, to a third party in exchange for $51 million plus accrued but unpaid distributions on the units.  The 500,000 preferred membership units are mandatorily redeemable in January 2112.

Entergy and Entergy Louisiana do not report the bonds issued by the LPFA on their balance sheets because the bonds are the obligation of the LPFA, and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC, and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

Entergy Mississippi

Entergy Mississippi has approval from the MPSC to collect a storm damage provision of $1.75 million per month. If Entergy Mississippi’s accumulated storm damage provision balance exceeds $15 million, the collection of the storm damage provision ceases until such time that the accumulated storm damage provision becomes less than $10 million. As of April 30, 2016, Entergy Mississippi’s storm damage provision balance was less than $10 million, therefore Entergy Mississippi resumed billing the monthly storm damage provision effective with June 2016 bills. As of September 30, 2016, however, Entergy Mississippi’s storm damage provision balance again exceeded $15 million. Accordingly the storm damage provision was reset to zero beginning with November 2016 bills. As of July 31, 2017, the balance in Entergy Mississippi’s accumulated storm damage provision was again less than $10 million, therefore Entergy Mississippi resumed billing the monthly storm damage provision effective with September 2017 bills.

Entergy New Orleans

In August 2012, Hurricane Isaac caused extensive damage to Entergy New Orleans’s service area. In January 2015 the City Council issued a resolution approving the terms of a joint agreement in principle filed by Entergy New Orleans, Entergy Louisiana, and the City Council Advisors determining, among other things, that Entergy New Orleans’s prudently-incurred storm recovery costs were $49.3 million, of which $31.7 million, net of reimbursements from the storm reserve escrow account, remained recoverable from Entergy New Orleans’s electric customers. The resolution also directed Entergy New Orleans to file an application to securitize the unrecovered City Council-approved storm recovery costs of $31.7 million pursuant to the Louisiana Electric Utility Storm Recovery Securitization Act (Louisiana Act 64). In addition, the resolution found that it was reasonable for Entergy New Orleans to include in the principal amount of its potential securitization the costs to fund and replenish Entergy New Orleans’s storm reserve in an amount that achieved the City Council-approved funding level of $75 million. In January 2015, in compliance with that directive, Entergy New Orleans filed with the City Council an application requesting that the City Council grant a financing order authorizing the financing of Entergy New Orleans’s storm costs, storm reserves, and issuance costs pursuant to Louisiana Act 64. In May 2015 the parties entered into an agreement in principle and the City Council issued a financing order authorizing Entergy New Orleans to issue storm recovery bonds in the aggregate amount of $98.7 million, including $31.8 million for recovery of Entergy New Orleans’s Hurricane Isaac storm recovery costs, including carrying costs, $63.9 million to fund and replenish Entergy New Orleans’s storm reserve, and approximately $3 million for estimated up-front financing costs associated with the securitization. See Note 5 to the financial statements for discussion of the issuance of the securitization bonds in July 2015.

New Nuclear Generation Development Costs

Entergy Louisiana

Entergy Louisiana and Entergy Gulf States Louisiana were developing a project option for new nuclear generation at River Bend.  In March 2010, Entergy Louisiana and Entergy Gulf States Louisiana filed with the LPSC seeking approval to continue the limited development activities necessary to preserve an option to construct a new unit at River Bend.  At its June 2012 meeting the LPSC voted to uphold an ALJ recommendation that the request of Entergy Louisiana and Entergy Gulf States Louisiana be declined on the basis that the LPSC’s rule on new nuclear development does not apply to activities to preserve an option to develop and on the further grounds that the companies improperly engaged in advanced preparation activities prior to certification.  The LPSC directed that Entergy Louisiana and Entergy Gulf States Louisiana be permitted to seek recovery of these costs in their upcoming rate case filings that were subsequently filed in February 2013. In the resolution of the rate case proceeding the LPSC provided for an eight-year amortization of costs incurred in connection with the potential development of new nuclear generation at River Bend, without carrying costs, beginning in December 2014, provided, however, that amortization of these costs shall not result in a future rate increase. As of December 31, 2017, Entergy Louisiana has a regulatory asset of $35.8 million on its balance sheet related to these new nuclear generation development costs.
System Energy [Member]  
Rate And Regulatory Matters
RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)
 
Regulatory Assets and Regulatory Liabilities

Regulatory assets represent probable future revenues associated with costs that Entergy expects to recover from customers through the regulatory ratemaking process under which the Utility business operates. Regulatory liabilities represent probable future reductions in revenues associated with amounts that Entergy expects to benefit customers through the regulatory ratemaking process under which the Utility business operates. In addition to the regulatory assets and liabilities that are specifically disclosed on the face of the balance sheets, the tables below provide detail of “Other regulatory assets” and “Other regulatory liabilities” that are included on Entergy’s and the Registrant Subsidiaries’ balance sheets as of December 31, 2017 and 2016:
 
Other Regulatory Assets

Entergy
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$2,642.3

 

$2,635.5

Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
746.0

 
677.2

Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 2 – Storm Cost Recovery Filings with Retail Regulators) (Note 5)
558.9

 
637.0

Removal costs - recovered through depreciation rates (Note 9) (a)
436.5

 
353.9

Opportunity Sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding)
109.8

 

Retail rate deferrals - recovered through rate riders as rates are redetermined by retail regulators
86.4

 
22.1

Unamortized loss on reacquired debt - recovered over term of debt
82.9

 
91.4

Little Gypsy costs – recovered through securitization (Note 5 – Entergy Louisiana Securitization Bonds - Little Gypsy)
73.7

 
100.0

Transition to competition costs - recovered over a 15-year period through February 2021
37.7

 
47.9

New nuclear generation development costs (Note 2 - New Nuclear Generation Development Costs) (b)
36.4

 
43.7

Other
125.1

 
161.2

Entergy Total

$4,935.7

 

$4,769.9



Entergy Arkansas
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$757.0

 

$786.6

Asset retirement obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
345.2

 
322.9

Removal costs - recovered through depreciation rates (Note 9) (a)
176.9

 
128.5

Opportunity sales - recovery will be determined after final order in proceeding (Note 2 - Entergy Arkansas Opportunity Sales Proceeding)
109.8

 

Storm damage costs - recovered either through securitization or retail rates (Note 5 - Entergy Arkansas Securitization Bonds)
76.2

 
88.9

Retail rate deferrals - recovered through rate riders as rates are redetermined annually
28.2

 
10.1

Unamortized loss on reacquired debt - recovered over term of debt
24.3

 
27.6

ANO Fukushima and Flood Barrier costs - recovered through retail rates through February 2026 (Note 2 - Retail Rate Proceedings) (b)
14.4

 
16.1

Lake Catherine 4 reliability and sustainability cost deferral - recovery through retail rates (b)
8.9

 
9.8

Incremental ice storm costs - recovered through 2032
7.4

 
7.9

MISO costs - recovery through retail rates through 2018 (Note 2 - Retail Rate Proceedings) (b)
5.5

 
11.1

Human capital management costs - recovery through retail rates through August 2019 (Note 2 - Retail Rate Proceedings) (b)
4.4

 
7.0

Other
9.2

 
11.5

Entergy Arkansas Total

$1,567.4

 

$1,428.0



Entergy Louisiana
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans and Non-Qualified Pension Plans) (a)

$724.6

 

$715.7

Asset Retirement Obligation - recovery dependent upon timing of decommissioning of nuclear units or dismantlement of non-nuclear power plants (Note 9) (a)
218.6

 
199.4

Little Gypsy costs – recovered through securitization (Note 5 – Entergy Louisiana Securitization Bonds - Little Gypsy)
71.4

 
97.8

New nuclear generation development costs - recovery through formula rate plan beginning December 2014 through November 2022 (Note 2 - New Nuclear Generation Development Costs) (b)
35.8

 
43.1

Unamortized loss on reacquired debt - recovered over term of debt
24.7

 
27.0

Storm damage costs - recovered through retail rates (Note 2 - Storm Cost Recovery Filings with Retail Regulators)
14.3

 

Business combination external costs deferral - recovery through formula rate plan beginning December 2015 through November 2025 (b)
14.1

 
15.2

River Bend AFUDC - recovered through August 2025 (Note 1 – River Bend AFUDC)
12.9

 
14.8

Other
29.4

 
55.1

Entergy Louisiana Total

$1,145.8

 

$1,168.1



Entergy Mississippi
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$218.7

 

$217.2

Removal costs - recovered through depreciation rates (Note 9) (a)
91.6

 
82.0

Retail rate deferrals - recovered through rate riders as rates are redetermined annually
49.4

 
9.3

Unamortized loss on reacquired debt - recovered over term of debt
17.6

 
18.9

Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
7.6

 
7.2

Other
13.0

 
7.6

Entergy Mississippi Total

$397.9

 

$342.2



Entergy New Orleans
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)

$102.8

 

$108.8

Storm damage costs, including hurricane costs - recovered through retail rates and securitization (Note 2 - Storm Cost Recovery Filings with Retail Regulators)
82.3

 
93.6

Removal costs - recovered through depreciation rates (Note 9) (a)
44.8

 
40.1

Retail rate deferrals - recovered through rate riders as rates are redetermined monthly or annually
4.4

 
4.3

Asset retirement obligation - recovery dependent upon timing of dismantlement of non-nuclear power plants (Note 9) (a)
4.3

 
4.2

Unamortized loss on reacquired debt - recovered over term of debt
3.0

 
3.4

Rate case costs - recovered over a 6-year period through September 2021 (Note 2 - Retail Rate Proceedings)
2.6

 
3.0

Michoud plant maintenance – recovered over a 7-year period through September 2018
1.4

 
3.3

Other
5.8

 
7.4

Entergy New Orleans Total

$251.4

 

$268.1



Entergy Texas
 
2017
 
2016
 
(In Millions)
Storm damage costs, including hurricane costs - recovered through securitization and retail rates (Note 5 - Entergy Texas Securitization Bonds)

$386.1

 

$442.4

Pension & postretirement costs (Note 11 – Qualified Pension Plans, Other Postretirement Benefits, and Non-Qualified Pension Plans) (a)
169.2

 
201.7

Transition to competition costs - recovered over a 15-year period through February 2021
37.7

 
47.9

Removal costs - recovered through depreciation rates (Note 9) (a)
55.2

 
33.5

Unamortized loss on reacquired debt - recovered over term of debt
8.7

 
9.0

Other
4.5

 
5.7

Entergy Texas Total

$661.4

 

$740.2



System Energy
 
2017
 
2016
 
(In Millions)
Pension & postretirement costs (Note 11 – Qualified Pension Plans and Other Postretirement Benefits) (a)

$202.7

 

$193.5

Asset retirement obligation - recovery dependent upon timing of decommissioning (Note 9) (a)
169.1

 
142.5

Removal costs - recovered through depreciation rates (Note 9) (a)
67.9

 
69.7

Unamortized loss on reacquired debt - recovered over term of debt
4.6

 
5.5

System Energy Total

$444.3

 

$411.2



(a)
Does not earn a return on investment, but is offset by related liabilities.
(b)
Does not earn a return on investment.
Other Regulatory Liabilities

Entergy
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)

$989.3

 

$735.5

Vidalia purchased power agreement (Note 8) (b)
151.6

 
202.4

Louisiana Act 55 financing savings obligation (Note 2 - Storm Cost Recovery Filings with Retail Regulators) (b)
124.8

 
165.5

Grand Gulf sale-leaseback - (Note 10 - Sale and Leaseback Transactions)
67.9

 
67.9

Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates beginning December 2015 through November 2024 (Note 2 - Entergy Louisiana and Entergy Gulf States Louisiana Business Combination)
65.8

 
83.5

Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4

 
44.4

Asset retirement obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
36.7

 
32.7

Removal costs - returned to customers through depreciation rates (Note 9) (a)
32.4

 
53.9

Entergy Mississippis accumulated accelerated Grand Gulf amortization - amortized and credited through the Unit Power Sales Agreement
32.1

 
39.3

Waterford 3 replacement steam generator provision (Note 2 - Retail Rate Proceedings)

 
68.0

Other
43.5

 
79.8

Entergy Total

$1,588.5

 

$1,572.9


Entergy Arkansas
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)

$354.0

 

$280.8

Other
9.6

 
25.1

Entergy Arkansas Total

$363.6

 

$305.9



Entergy Louisiana
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 16) (a)

$323.7

 

$235.4

Vidalia purchased power agreement (Note 8) (b)
151.6

 
202.4

Louisiana Act 55 financing savings obligation (Note 2 - Storm Cost Recovery Filings with Retail Regulators) (b)
124.8

 
165.5

Business combination guaranteed customer benefits - returned to customers through retail rates and fuel rates beginning December 2015 through November 2024 (Note 2 - Entergy Louisiana and Entergy Gulf States Louisiana Business Combination)
65.8

 
83.5

Gas hedging costs - refunded through fuel rates (Note 15 - Derivatives)

 
10.9

Asset Retirement Obligation - return to customers dependent upon timing of decommissioning (Note 9) (a)
36.7

 
32.7

Removal costs - returned to customers through depreciation rates (Note 9) (a)
32.4

 
53.9

Waterford 3 replacement steam generator provision (Note 2 - Retail Rate Proceedings)

 
68.0

Other
26.1

 
28.7

Entergy Louisiana Total

$761.1

 

$881.0



Entergy Texas
 
2017
 
2016
 
(In Millions)
Transition to competition costs - returned to customers through rate riders when rates are redetermined periodically

$4.8

 

$6.2

Other
2.1

 
2.3

Entergy Texas Total

$6.9

 

$8.5


System Energy
 
2017
 
2016
 
(In Millions)
Unrealized gains on nuclear decommissioning trust funds (Note 17) (a)

$311.6

 

$219.3

Grand Gulf sale-leaseback - (Note 10 - Sale and Leaseback Transactions)
67.9

 
67.9

Entergy Arkansass accumulated accelerated Grand Gulf amortization - will be returned to customers when approved by the APSC and the FERC
44.4

 
44.4

Entergy Mississippis accumulated accelerated Grand Gulf amortization - amortized and credited through the Unit Power Sales Agreement
32.1

 
39.3

System Energy Total

$456.0

 

$370.9



(a)
Offset by related asset.
(b)
As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21% effective January 2018, the Vidalia purchased power agreement regulatory liability was reduced by $30.5 million and the Louisiana Act 55 financing savings obligation regulatory liabilities were reduced by $25.0 million, with corresponding increases to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

Regulatory activity regarding the Tax Cuts and Jobs Act

See the “Other Tax Matters - Tax Cuts and Jobs Act” section in Note 3 to the financial statements for discussion of the effects of the enactment of the Tax Cuts and Jobs Act, in December 2017, including its effects on Entergy’s and the Registrant Subsidiaries’ regulatory asset/liability for income taxes.

After enactment of the Tax Cuts and Jobs Act the APSC issued an order that applies to investor-owned utilities in Arkansas, including Entergy Arkansas. The order requests information regarding certain effects of the Tax Cuts and Jobs Act and requires the utilities to begin, effective January 1, 2018, to record regulatory liabilities to record the effects of the Act, subject to review by the APSC, although the order acknowledges that the exact amount of tax savings and rate reductions cannot be determined at this time. Entergy Arkansas requested clarification or, in the alternative, rehearing regarding the requirement to record a regulatory liability, and also responded to the request for information. In its request for clarification Entergy Arkansas sought clarification that the amount of any regulatory liability would be determined only after the utilities are heard and present evidence on the issue, as this otherwise would be arbitrary and could implicate single-issue and retroactive ratemaking. The APSC has not responded to the request for clarification. In its response to the APSC’s request for information Entergy Arkansas states that its formula rate plan rider already provides the means for customers to realize the benefits of the Act, except for the return of unprotected excess accumulated deferred income taxes. Entergy Arkansas’s next formula rate plan filing is scheduled for July 2018. Entergy Arkansas intends to return unprotected excess accumulated deferred income taxes as expeditiously as possible, subject to a subsequent request to be made by Entergy Arkansas and approval by the APSC.

After enactment of the Tax Cuts and Jobs Act the LPSC passed an agenda item requiring utilities, including Entergy Louisiana, to file reports regarding certain effects of the Act. Entergy Louisiana responded to the directive and stated in its response that it is working with the LPSC staff and other interested parties to extend its formula rate plan such that its next base rate change will occur effective September 2018, or it would file a base rate case. Entergy Louisiana went on to state that if the formula rate plan is extended Entergy Louisiana’s next adjustment of rates will reflect the new 21% federal corporate income tax rate. Entergy Louisiana stated that it is working with the LPSC staff and interested parties to determine when the tax rate reduction will be reflected in rates, along with when and how the excess accumulated deferred income taxes will be reflected in rates, and how certain tax sharing agreement customer credits will be adjusted. On February 21, 2018, the LPSC issued a special order requiring that all LPSC-jurisdictional utilities, beginning as of January 1, 2018, record as a regulatory liability (deferred liability) the amount required to reflect the reduction in the federal corporate income tax rate from 35% to 21% and the associated savings in excess accumulated deferred income taxes until such time as its rates are changed by the LPSC to reflect these federal tax savings. In the same special order, the LPSC also initiated a new rulemaking docket to consider these issues and the appropriate manner in which to flow through the benefits to Louisiana customers and to provide an opportunity for discovery and comments of jurisdictional utilities and other interested stakeholders. The rulemaking further requires the LPSC staff to report back to the LPSC as soon as practicable and preferably by the March 21, 2018, LPSC Business and Executive Session with recommendations as to how the federal tax-related benefits will be flowed through to Louisiana customers.

After enactment of the Tax Cuts and Jobs Act the MPSC ordered utilities, including Entergy Mississippi, that operate under a formula rate plan to file a description by February 26, 2018, of how the Act will be reflected in the formula rate plan under which the utility operates. In addition to the description that is due February 26, 2018, Entergy Mississippi’s formula rate plan 2018 test year filing is scheduled to be filed by March 15, 2018.

After enactment of the Tax Cuts and Jobs Act the City Council passed a resolution ordering Entergy New Orleans to, effective January 1, 2018, record deferred regulatory liabilities to account for the Act’s effect on Entergy New Orleans’s revenue requirement and to make a filing by mid-March 2018 regarding the Act’s effects on Entergy New Orleans’s operating income and rate base and potential mechanisms for customers to receive benefits of the Act. The resolution also directed Entergy New Orleans to request that Entergy Services file with the FERC for revisions of the Unit Power Sales Agreement and MSS-4 replacement tariffs to address the return of excess accumulated deferred income taxes. Entergy plans to make such filings with the FERC by the end of March 2018.
After enactment of the Tax Cuts and Jobs Act the PUCT issued an order requiring most utilities, including Entergy Texas, beginning January 25, 2018, to record a regulatory liability for the difference between revenues collected under existing rates and revenues that would have been collected had existing rates been set using the new federal income tax rates and also for the balance of excess accumulated deferred income taxes. The order also directs the PUCT staff to investigate each investor-owned utility on a case-by-case basis to determine the appropriate mechanism to adjust its rates to reflect the changes under the Act. In both a memorandum issued prior to the open meeting when the order was discussed and during the discussions at the open meeting discussing the order, the PUCT indicated that it would consider utility earnings in determining the treatment of the liability and the effects of the Act. Entergy Texas had previously provided information to the PUCT Staff in the docket and stated that it expects the PUCT to address the lower tax expense as part of Entergy Texas’s rate case expected to be filed in May 2018. Entergy Texas also stated that it would be inappropriate for the PUCT to require a refund of the reduction in income tax expense in 2018 resulting from the Act on a retroactive basis and without a comprehensive review of Entergy Texas’s cost of service and earned return on equity. In a subsequent order issued following the February 2018 open meeting, the PUCT clarified that carrying costs need not be recorded as part of the regulatory liability.

The Registrant Subsidiaries will continue to work with their respective regulators to determine the appropriate path forward in each jurisdiction regarding the effects of the Act.

Fuel and purchased power cost recovery

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas are allowed to recover fuel and purchased power costs through fuel mechanisms included in electric and gas rates that are recorded as fuel cost recovery revenues.  The difference between revenues collected and the current fuel and purchased power costs is generally recorded as “Deferred fuel costs” on the Utility operating companies’ financial statements.  The table below shows the amount of deferred fuel costs as of December 31, 2017 and 2016 that Entergy expects to recover (or return to customers) through fuel mechanisms, subject to subsequent regulatory review.
 
2017
 
2016
 
(In Millions)
Entergy Arkansas (a)

$130.4

 

$163.6

Entergy Louisiana (b)

$96.7

 

$119.9

Entergy Mississippi

$32.4

 

$7.0

Entergy New Orleans (b)

($3.7
)
 

$8.9

Entergy Texas

($67.3
)
 

($54.5
)

(a)
Includes $67.1 million in 2017 and $66.9 million in 2016 of fuel and purchased power costs, which do not currently earn a return on investment and whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.
(b)
Includes $168.1 million in each year for Entergy Louisiana and $4.1 million in each year for Entergy New Orleans of fuel, purchased power, and capacity costs, which do not currently earn a return on investment and whose recovery periods are indeterminate but are expected to be recovered over a period greater than twelve months.

Entergy Arkansas

Production Cost Allocation Rider

The APSC approved a production cost allocation rider for recovery from customers of the retail portion of the costs allocated to Entergy Arkansas as a result of the System Agreement proceedings, which are discussed in the “System Agreement Cost Equalization Proceedings” section below.  These costs cause an increase in Entergy Arkansas’s deferred fuel cost balance because Entergy Arkansas pays the costs over seven months but collects the costs from customers over twelve months.

In May 2014, Entergy Arkansas filed its annual redetermination of the production cost allocation rider to recover the $3 million unrecovered retail balance as of December 31, 2013 and the $67.8 million System Agreement bandwidth remedy payment made in May 2014 as a result of the compliance filing pursuant to the FERC’s February 2014 orders related to the bandwidth payments/receipts for the June - December 2005 period. In January 2015 the APSC issued an order approving Entergy Arkansas’s request for recovery of the $3 million under-recovered amount based on the true-up of the production cost allocation rider and the $67.8 million May 2014 System Agreement bandwidth remedy payment subject to refund with interest, with recovery of these payments concluding with the last billing cycle in December 2015. The APSC also found that Entergy Arkansas is entitled to carrying charges pursuant to the current terms of the production cost allocation rider. Entergy Arkansas made its compliance filing pursuant to the order in January 2015 and the APSC issued its approval order, also in January 2015. The redetermined rate went into effect with the first billing cycle of February 2015.

In May 2015, Entergy Arkansas filed its annual redetermination of the production cost allocation rider, which included a $38 million payment made by Entergy Arkansas as a result of the FERC’s February 2014 order related to the comprehensive bandwidth recalculation for calendar year 2006, 2007, and 2008 production costs. The redetermined rate for the 2015 production cost allocation rider update was added to the redetermined rate from the 2014 production cost allocation rider update and the combined rate was effective with the first billing cycle of July 2015. This combined rate was effective through December 2015. The collection of the remainder of the redetermined rate for the 2015 production cost allocation rider update continued through June 2016.

In May 2016, Entergy Arkansas filed its annual redetermination pursuant to the production cost allocation rider, which reflected recovery of the production cost allocation rider true-up adjustment of the 2014 and 2015 unrecovered retail balance in the amount of $1.9 million. Additionally, the redetermined rates reflected the recovery of a $1.9 million System Agreement bandwidth remedy payment resulting from a compliance filing pursuant to the FERC’s December 2015 order related to test year 2009 production costs. The rates for the 2016 production cost allocation rider update became effective with the first billing cycle of July 2016, and the rates were effective through June 2017.

In May 2017, Entergy Arkansas filed its annual redetermination pursuant to the production cost allocation rider, which reflected a credit amount of $0.3 million resulting from a compliance filing pursuant to the FERC’s September 2016 order. Additionally, the redetermined rate reflected recovery of the production cost allocation rider true-up adjustment of the 2016 unrecovered retail balance in the amount of $0.3 million. Because of the small effect of the 2017 production cost allocation rider update, Entergy Arkansas proposed to reduce the effective period of the update to one month, July 2017. After the one month collection period, rates were set to zero for all rate classes for the period August 2017 through June 2018.

Energy Cost Recovery Rider

Entergy Arkansas’s retail rates include an energy cost recovery rider to recover fuel and purchased energy costs in monthly customer bills.  The rider utilizes the prior calendar-year energy costs and projected energy sales for the twelve-month period commencing on April 1 of each year to develop an energy cost rate, which is redetermined annually and includes a true-up adjustment reflecting the over- or under-recovery, including carrying charges, of the energy costs for the prior calendar year.  The energy cost recovery rider tariff also allows an interim rate request depending upon the level of over- or under-recovery of fuel and purchased energy costs.

In January 2014, Entergy Arkansas filed a motion with the APSC relating to its redetermination of its energy cost rate that was subsequently filed in March 2014. In that motion, Entergy Arkansas requested that the APSC authorize Entergy Arkansas to exclude $65.9 million of deferred fuel and purchased energy costs incurred in 2013 from the redetermination of its 2014 energy cost rate. The $65.9 million is an estimate of the incremental fuel and replacement energy costs that Entergy Arkansas incurred as a result of the ANO stator incident. Entergy Arkansas requested that the APSC authorize Entergy Arkansas to retain that amount in its deferred fuel balance, with recovery to be reviewed in a later period after more information is available regarding various claims associated with the ANO stator incident. The APSC approved Entergy Arkansas’s request in February 2014. In July 2017, Entergy Arkansas filed for a change in rates pursuant to its formula rate plan rider. In that docket, the APSC approved a settlement agreement agreed upon by the parties, including a provision that requires Entergy Arkansas to initiate a docket for the purpose of recovering funds currently withheld from rates and related to the stator incident, including the $65.9 million of deferred fuel and purchased energy costs previously noted, subject to certain timelines and conditions set forth in the settlement agreement. See the “ANO Damage, Outage, and NRC Reviews” section in Note 8 to the financial statements for further discussion of the ANO stator incident.

In March 2017, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01164 per kWh to $0.01547 per kWh. The APSC staff filed testimony in March 2017 recommending that the redetermined rate be implemented with the first billing cycle of April 2017 under the normal operation of the tariff. Accordingly, the redetermined rate went into effect on March 31, 2017 pursuant to the tariff. In July 2017 the Arkansas Attorney General requested additional information to support certain of the costs included in Entergy Arkansas’s 2017 energy cost rate redetermination.

Entergy Louisiana

Entergy Louisiana recovers electric fuel and purchased power costs for the billing month based upon the level of such costs incurred two months prior to the billing month. Entergy Louisiana’s purchased gas adjustments include estimates for the billing month adjusted by a surcharge or credit that arises from an annual reconciliation of fuel costs incurred with fuel cost revenues billed to customers, including carrying charges.

In April 2010 the LPSC authorized its staff to initiate an audit of Entergy Louisiana’s fuel adjustment clause filings.  The audit included a review of the reasonableness of charges flowed through the fuel adjustment clause by Entergy Louisiana for the period from 2005 through 2009.  The LPSC staff issued its audit report in January 2013.  The LPSC staff recommended that Entergy Louisiana refund approximately $1.9 million, plus interest, to customers and realign the recovery of approximately $1 million from Entergy Louisiana’s fuel adjustment clause to base rates.  The recommended refund was made by Entergy Louisiana in May 2013 in the form of a credit to customers through its fuel adjustment clause filing. In October 2016 the LPSC staff filed testimony affirming the recommendation in its audit report on the lone remaining issue that nuclear dry fuel storage costs should be realigned to base rates. The parties agreed to remove that remaining issue to a separate docket because the same issue was outstanding in the Entergy Gulf States Louisiana audit for the same time period. In November 2016 the LPSC approved the resolution of this audit and the creation of a new docket for the resolution of the proper method of recovery for nuclear dry fuel storage costs. In December 2016 the LPSC opened a new docket in order to resolve the issue regarding the proper methodology for the recovery of nuclear dry fuel storage costs. In October 2017 the LPSC approved the continued recovery of the nuclear dry fuel storage costs through the fuel adjustment clause, resolving the open issue in the audit.

In December 2011 the LPSC authorized its staff to initiate a proceeding to audit the fuel adjustment clause filings of Entergy Gulf States Louisiana and its affiliates.  The audit included a review of the reasonableness of charges flowed by Entergy Gulf States Louisiana through its fuel adjustment clause for the period 2005 through 2009.  In March 2016 the LPSC staff consultant issued its audit report. In its report, the LPSC staff consultant recommended that Entergy Louisiana refund approximately $8.6 million, plus interest, to customers and realign the recovery of approximately $12.7 million from Entergy Gulf States Louisiana’s fuel adjustment clause to base rates. In September 2016 the LPSC staff filed testimony stating that it was no longer recommending a disallowance of $3.4 million of the $8.6 million discussed above, but otherwise maintained positions from its report. Subsequently, the parties entered into a settlement, which was approved by the LPSC in November 2016. The settlement recognized the dry cask storage recovery method issue, which was addressed in the separate proceeding approved by the LPSC in October 2017, provided for a refund of $5 million, which was made to legacy Entergy Gulf States Louisiana customers in December 2016, and resolved all other issues raised in the audit.
In July 2014 the LPSC authorized its staff to initiate an audit of Entergy Gulf States Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed by Entergy Gulf States Louisiana through its fuel adjustment clause for the period from 2010 through 2013. Discovery commenced in July 2015. No report of audit has been issued.

In July 2014 the LPSC authorized its staff to initiate an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed by Entergy Louisiana through its fuel adjustment clause for the period from 2010 through 2013. Discovery commenced in July 2015. No report of audit has been issued.

In June 2016 the LPSC staff provided notice of audits of Entergy Louisiana’s fuel adjustment clause filings and purchased gas adjustment clause filings. In recognition of the business combination that occurred in 2015, the audit notice was issued to Entergy Louisiana and will also include a review of charges to legacy Entergy Gulf States Louisiana customers prior to the business combination. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s fuel adjustment clause for the period from 2014 through 2015 and charges flowed through Entergy Louisiana’s purchased gas adjustment clause for the period from 2012 through 2015. Discovery commenced in March 2017. No report of audit has been issued.

Due to higher fuel costs for the operating month of January 2018 resulting in part from recent cold weather, higher Henry Hub prices, and an increase in total fuel and purchased power costs, Entergy Louisiana plans to cap the average fuel adjustment charge to be billed in March 2018 at $0.03060 per kWh and to defer billing of all fuel costs in excess of the capped amounts by including such costs in the over- or under-recovery account.

Entergy Mississippi

Entergy Mississippi’s rate schedules include an energy cost recovery rider that is adjusted annually to reflect accumulated over- or under-recoveries.  Entergy Mississippi’s fuel cost recoveries are subject to annual audits conducted pursuant to the authority of the MPSC.

Entergy Mississippi had a deferred fuel over-recovery balance of $58.3 million as of May 31, 2015, along with an under-recovery balance of $12.3 million under the power management rider. Pursuant to those tariffs, in July 2015, Entergy Mississippi filed for interim adjustments under both the energy cost recovery rider and the power management rider to flow through to customers the approximately $46 million net over-recovery over a six-month period. In August 2015, the MPSC approved the interim adjustments effective with September 2015 bills. In November 2015, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included a projected over-recovery balance of $48 million projected through January 31, 2016. In January 2016 the MPSC approved the redetermined annual factor effective February 1, 2016. The MPSC further ordered, however, that due to the significant change in natural gas price forecasts since Entergy Mississippi’s filing in November 2015 Entergy Mississippi should file a revised fuel factor with the MPSC no later than February 1, 2016. Pursuant to that order, Entergy Mississippi submitted a revised fuel factor. Additionally, because Entergy Mississippi’s projected over-recovery balance for the period ending January 31, 2016 was $68 million, in February 2016, Entergy Mississippi filed for another interim adjustment to the energy cost factor effective April 2016 to flow through to customers the projected over-recovery balance over a six-month period. That interim adjustment was approved by the MPSC in February 2016 effective for April 2016 bills.

In November 2016, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an over-recovery of less than $2 million as of September 30, 2016. In January 2017 the MPSC approved the annual factor effective with February 2017 bills. Also in January 2017 the MPSC certified to the Mississippi Legislature the audit reports of its independent auditors for the fuel year ending September 30, 2016. In its order, the MPSC expressly reserved the right to review and determine the recoverability of any and all purchased power expenditures made during fiscal year 2016. The MPSC hired independent auditors to conduct an annual operations audit and a financial audit. The independent auditors issued their audit reports in December 2017. The audit reports included several recommendations for action by Entergy Mississippi but did not recommend any cost disallowances. In January 2018 the MPSC certified the audit reports to the Mississippi Legislature. In November 2017 the Public Utilities Staff separately engaged a consultant to review the outage at the Grand Gulf Nuclear Station that began in 2016. The review is currently in progress.

In November 2017, Entergy Mississippi filed its annual redetermination of the annual factor to be applied under the energy cost recovery rider. The calculation of the annual factor included an under-recovery of approximately $61.5 million as of September 30, 2017. Entergy Mississippi proposed a two-tiered energy cost factor designed to promote overall rate stability throughout 2018 particularly during the summer months. In January 2018 the MPSC approved the proposed energy cost factors effective for February 2018 bills.

Mississippi Attorney General Complaint

The Mississippi attorney general filed a complaint in state court in December 2008 against Entergy Corporation, Entergy Mississippi, Entergy Services, and Entergy Power alleging, among other things, violations of Mississippi statutes, fraud, and breach of good faith and fair dealing, and requesting an accounting and restitution.  The complaint is wide ranging and relates to tariffs and procedures under which Entergy Mississippi purchases power not generated in Mississippi to meet electricity demand.  Entergy believes the complaint is unfounded.  In December 2008 the defendant Entergy companies removed the Attorney General’s lawsuit to U.S. District Court in Jackson, Mississippi.  The Mississippi attorney general moved to remand the matter to state court.  In August 2012 the District Court issued an opinion denying the Attorney General’s motion for remand, finding that the District Court has subject matter jurisdiction under the Class Action Fairness Act.

The defendant Entergy companies answered the complaint and filed a counterclaim for relief based upon the Mississippi Public Utilities Act and the Federal Power Act.  In May 2009 the defendant Entergy companies filed a motion for judgment on the pleadings asserting grounds of federal preemption, the exclusive jurisdiction of the MPSC, and factual errors in the Attorney General’s complaint.  In September 2012 the District Court heard oral argument on Entergy’s motion for judgment on the pleadings.

In January 2014 the U.S. Supreme Court issued a decision in which it held that cases brought by attorneys general as the sole plaintiff to enforce state laws were not considered “mass actions” under the Class Action Fairness Act, so as to establish federal subject matter jurisdiction. One day later the Attorney General renewed his motion to remand the Entergy case back to state court, citing the U.S. Supreme Court’s decision. The defendant Entergy companies responded to that motion reiterating the additional grounds asserted for federal question jurisdiction, and the District Court held oral argument on the renewed motion to remand in February 2014. In April 2015 the District Court entered an order denying the renewed motion to remand, holding that the District Court has federal question subject matter jurisdiction. The Attorney General appealed to the U.S. Fifth Circuit Court of Appeals the denial of the motion to remand. In July 2015 the Fifth Circuit issued an order denying the appeal, and the Attorney General subsequently filed a petition for rehearing of the request for interlocutory appeal, which was also denied. In December 2015 the District Court ordered that the parties submit to the court undisputed and disputed facts that are material to the Entergy defendants’ motion for judgment on the pleadings, as well as supplemental briefs regarding the same. Those filings were made in January 2016.

In September 2016 the Attorney General filed a mandamus petition with the U.S. Fifth Circuit Court of Appeals in which the Attorney General asked the Fifth Circuit to order the chief judge to reassign this case to another judge. In September 2016 the District Court denied the Entergy companies’ motion for judgment on the pleadings. The Entergy companies filed a motion seeking to amend the District Court’s order denying the Entergy companies’ motion for judgment on the pleadings and allowing an interlocutory appeal. In October 2016 the Fifth Circuit granted the Attorney General’s motion for writ of mandamus and directed the chief judge to assign the case to a new judge. The case was reassigned in October 2016. In January 2017 the District Court denied the Entergy companies’ motion to amend the order denying the motion for judgment on the pleadings. In June 2017 the District Court issued a case management order setting a trial date in November 2018. Discovery is currently in progress.
Entergy New Orleans

Entergy New Orleans’s electric rate schedules include a fuel adjustment tariff designed to reflect no more than targeted fuel and purchased power costs, adjusted by a surcharge or credit for deferred fuel expense arising from the monthly reconciliation of actual fuel and purchased power costs incurred with fuel cost revenues billed to customers, including carrying charges.
 
Entergy New Orleans’s gas rate schedules include a purchased gas adjustment to reflect estimated gas costs for the billing month, adjusted by a surcharge or credit similar to that included in the electric fuel adjustment clause, including carrying charges.

Due to higher fuel costs associated in part with the extended Grand Gulf outage and the partially simultaneous Union Power Block 1 planned outage, for the December 2016, January 2017, and February 2017 billing months, the City Council authorized Entergy New Orleans to cap the fuel adjustment charge billed to customers at $0.035 per kWh and to defer billing of all fuel costs in excess of the capped amount by including such costs in the over- or under-recovery account.

Due to higher fuel costs for the operating month of January 2018 resulting in part from recent cold weather, higher Henry Hub prices, and an increase in total fuel and purchased power costs associated in part with certain plant outages, Entergy New Orleans has proposed to cap the fuel adjustment charge to be billed in March 2018 to non-transmission Entergy New Orleans legacy customers and Entergy New Orleans Algiers customers at $0.035323 per kWh and $0.025446 per kWh, respectively. Entergy New Orleans has also proposed to cap the fuel adjustment charge to be billed in March 2018 for Entergy New Orleans legacy transmission customers at $0.034609 per kWh and to defer billing of all fuel costs in excess of the capped amount by including such costs in the over- or under-recovery account.

Entergy Texas

Entergy Texas’s rate schedules include a fixed fuel factor to recover fuel and purchased power costs, including interest, not recovered in base rates.   Semi-annual revisions of the fixed fuel factor are made in March and September based on the market price of natural gas and changes in fuel mix.  The amounts collected under Entergy Texas’s fixed fuel factor and any interim surcharge or refund are subject to fuel reconciliation proceedings before the PUCT.
        
In August 2014, Entergy Texas filed an application seeking PUCT approval to implement an interim fuel refund of approximately $24.6 million for over-collected fuel costs incurred during the months of November 2012 through April 2014. This refund resulted from (i) applying $48.6 million in bandwidth remedy payments that Entergy Texas received in May 2014 related to the June - December 2005 period to Entergy Texas’s $8.7 million under-recovered fuel balance as of April 30, 2014 and (ii) netting that fuel balance against the $15.3 million bandwidth remedy payment that Entergy Texas made related to calendar year 2013 production costs. Also in August 2014, Entergy Texas filed an unopposed motion for interim rates to implement these refunds for most customers over a two-month period commencing with September 2014. The PUCT issued its order approving the interim relief in August 2014 and Entergy Texas completed the refunds in October 2014. Parties intervened in this matter, and all parties agreed that the proceeding should be bifurcated such that the proposed interim refund would become final in a separate proceeding, which refund was approved by the PUCT in March 2015.   In July 2015 certain parties filed briefs in the open proceeding asserting that Entergy Texas should refund to retail customers an additional $10.9 million in bandwidth remedy payments Entergy Texas received related to calendar year 2006 production costs.  In October 2015 an ALJ issued a proposal for decision recommending that the additional $10.9 million in bandwidth remedy payments be refunded to retail customers. In January 2016 the PUCT issued its order affirming the ALJ’s recommendation, and Entergy Texas filed a motion for rehearing of the PUCT’s decision, which the PUCT denied. In March 2016, Entergy Texas filed a complaint in Federal District Court for the Western District of Texas and a petition in the Travis County (State) District Court appealing the PUCT’s decision. The pending appeals did not stay the PUCT’s decision. In April 2016, Entergy Texas filed with the PUCT an application to refund to customers approximately $56.2 million. The refund resulted from (i) $41.8 million of fuel cost recovery over-collections through February 2016, (ii) the $10.9 million in bandwidth remedy payments, discussed above, that Entergy Texas received related to calendar year 2006 production costs, and (iii) $3.5 million in bandwidth remedy payments that Entergy Texas received related to 2006-2008 production costs. In June 2016, Entergy Texas filed an unopposed settlement agreement that added additional over-recovered fuel costs for the months of March and April 2016. The settlement resulted in a $68 million refund. The ALJ approved the refund on an interim basis to be made to most customers over a four-month period beginning with the first billing cycle of July 2016. In July 2016 the PUCT issued an order approving the interim refund. The federal appeal of the PUCT’s January 2016 decision was heard in December 2016, and the Federal District Court granted Entergy Texas’s requested relief. In January 2017 the PUCT and an intervenor filed petitions for appeal to the U.S. Court of Appeals for the Fifth Circuit of the Federal District Court ruling. Oral argument was held before the U.S. Court of Appeals for the Fifth Circuit in February 2018, and a decision is pending. The State District Court appeal of the PUCT’s January 2016 decision also remains pending.

In July 2016, Entergy Texas filed an application to reconcile its fuel and purchased power costs for the period April 1, 2013 through March 31, 2016. Under a recent PUCT rule change, a fuel reconciliation is required to be filed at least once every three years and outside of a base rate case filing. During the reconciliation period, Entergy Texas incurred approximately $1.77 billion in Texas jurisdictional eligible fuel and purchased power expenses, net of certain revenues credited to such expenses and other adjustments. Entergy Texas estimated an over-recovery balance of approximately $19.3 million, including interest, which Entergy Texas requested authority to carry over as the beginning balance for the subsequent reconciliation period beginning Apri1 2016. Entergy Texas also noted, however, that the estimated $19.3 million over collection was being refunded to customers as a portion of the interim fuel refund beginning with the first billing cycle of July 2016, discussed above. Entergy Texas also requested a prudence finding for each of the fuel-related contracts and arrangements entered into or modified during the reconciliation period that have not been reviewed by the PUCT in a prior proceeding. In December 2016, Entergy Texas entered into a stipulation and settlement agreement resulting in a $6 million disallowance not associated with any particular issue raised and a refund of the over-recovery balance of $21 million as of November 30, 2016, to most customers beginning April 2017 through June 2017. This settlement was developed concurrently with the stipulation and settlement agreement in the 2016 transmission cost recovery factor rider amendment discussed below, and the terms and conditions in both settlements are interdependent. The fuel reconciliation settlement was approved by the PUCT in March 2017 and the refunds were made.

In June 2017, Entergy Texas filed an application for a fuel refund of approximately $30.7 million for the months of December 2016 through April 2017. For most customers, the refunds flowed through bills for the months of July 2017 through September 2017. The fuel refund was approved by the PUCT in August 2017.

In December 2017, Entergy Texas filed an application for a fuel refund of approximately $30.5 million for the months of May 2017 through October 2017. Also in December 2017, the PUCT’s ALJ approved the refund on an interim basis. For most customers, the refunds flowed through bills beginning January 2018 and will continue through March 2018. A final decision in this matter remains pending.
    
Retail Rate Proceedings

Filings with the APSC (Entergy Arkansas)

Retail Rates

2015 Base Rate Filing
 
In April 2015, Entergy Arkansas filed with the APSC for a general change in rates, charges, and tariffs. The filing notified the APSC of Entergy Arkansas’s intent to implement a forward test year formula rate plan pursuant to Arkansas legislation passed in 2015, and requested a retail rate increase of $268.4 million, with a net increase in revenue of $167 million. The filing requested a 10.2% return on common equity. In September 2015 the APSC staff and intervenors filed direct testimony, with the APSC staff recommending a revenue requirement of $217.9 million and a 9.65% return on common equity. In December 2015, Entergy Arkansas, the APSC staff, and certain of the intervenors in the rate case filed with the APSC a joint motion for approval of a settlement of the case that proposed a retail rate increase of approximately $225 million with a net increase in revenue of approximately $133 million; an authorized return on common equity of 9.75%; and a formula rate plan tariff that provides a +/- 50 basis point band around the 9.75% allowed return on common equity. A significant portion of the rate increase is related to Entergy Arkansas’s acquisition in March 2016 of Union Power Station Power Block 2 for a base purchase price of $237 million. The settlement agreement also provided for amortization over a 10-year period of $7.7 million of previously-incurred costs related to ANO post-Fukushima compliance and $9.9 million of previously-incurred costs related to ANO flood barrier compliance. A settlement hearing was held in January 2016. In February 2016 the APSC approved the settlement with one exception that reduced the retail rate increase proposed in the settlement by $5 million. The settling parties agreed to the APSC modifications in February 2016. The new rates were effective February 24, 2016 and began billing with the first billing cycle of April 2016. In March 2016, Entergy Arkansas made a compliance filing regarding the new rates that included an interim base rate adjustment surcharge, effective with the first billing cycle of April 2016, to recover the incremental revenue requirement for the period February 24, 2016 through March 31, 2016. The interim base rate adjustment surcharge was designed to recover a total of $21.1 million over the nine-month period from April 2016 through December 2016.

2016 Formula Rate Plan Filing
    
In July 2016, Entergy Arkansas filed with the APSC its 2016 formula rate plan filing showing Entergy Arkansas’s projected earned return on common equity for the twelve months ended December 31, 2017 test period to be below the formula rate plan bandwidth. The filing requested a $67.7 million revenue requirement increase to achieve Entergy Arkansas’s target earned return on common equity of 9.75%. In October 2016, Entergy Arkansas filed with the APSC revised formula rate plan attachments with an updated request for a $54.4 million revenue requirement increase based on acceptance of certain adjustments and recommendations made by the APSC staff and other intervenors, as well as three additional adjustments identified as appropriate by Entergy Arkansas. In November 2016 a hearing was held and the APSC issued an order directing the parties to brief certain issues. In December 2016 the APSC approved the settlement agreement and the $54.4 million revenue requirement increase with approximately $25 million of the $54.4 million revenue requirement subject to possible future adjustment and refund to customers with interest. The APSC requested supplemental information for some of Entergy Arkansas’s requested nuclear expenditures. In December 2016 the APSC approved Entergy Arkansas’s formula rate plan compliance tariff, and the rates became effective with the first billing cycle of January 2017. In April 2017, Entergy Arkansas filed a motion consented to by all parties requesting that it be permitted to submit the supplemental information requested by the APSC in conjunction with its 2017 formula rate plan filing, which was subsequently made in July 2017 and is discussed below. In May 2017 the APSC approved the joint motion and proposal to review Entergy Arkansas’s supplemental information on a concurrent schedule with the 2017 formula rate plan filing. In October 2017, Entergy Arkansas and the parties to the proceeding filed a joint motion to approve a unanimous settlement agreement resolving all issues in the docket and providing for recovery of the 2017 and 2018 nuclear costs. In December 2017 the APSC approved the settlement agreement and recovery of the 2017 and 2018 nuclear costs.

2017 Formula Rate Plan Filing

In July 2017, Entergy Arkansas filed with the APSC its 2017 formula rate plan filing showing Entergy Arkansas’s projected earned return on common equity for the twelve months ended December 31, 2018 test period to be below the formula rate plan bandwidth.  The filing projected a $129.7 million revenue requirement increase to achieve Entergy Arkansas’s target earned return on common equity of 9.75%.  Entergy Arkansas’s formula rate plan is subject to a four percent annual revenue constraint and the projected annual revenue requirement increase exceeded the four percent, resulting in a proposed increase for the 2017 formula rate plan of $70.9 million. In October 2017, Entergy Arkansas filed with the APSC revised formula rate plan attachments that projected a $126.2 million revenue requirement increase based on acceptance of certain adjustments and recommendations made by the APSC staff and other intervenors. The revised formula rate plan filing included a proposed $71.1 million revenue requirement increase based on a revision to the four percent constraint calculation. In October 2017, Entergy Arkansas and the parties to the proceeding filed a joint motion to approve a unanimous settlement agreement resolving all issues in the docket and providing for recovery of the 2017 and 2018 nuclear costs. In December 2017 the APSC approved the settlement agreement and the $71.1 million revenue requirement increase, as well as Entergy Arkansas’s formula rate plan compliance tariff, and the rates became effective with the first billing cycle of January 2018.
 
Internal Restructuring

In November 2017, Entergy Arkansas filed an application with the APSC seeking authorization to undertake a restructuring that would result in the transfer of substantially all of the assets and operations of Entergy Arkansas to a new entity, which would ultimately be owned by an existing Entergy subsidiary holding company. The restructuring is subject to regulatory review and approval by the APSC, the FERC, and the NRC. Entergy Arkansas also filed a notice with the Missouri Public Service Commission in December 2017 out of an abundance of caution, although Entergy Arkansas does not serve any retail customers in Missouri. If the APSC approves the restructuring by September 1, 2018, and the restructuring closes on or before December 1, 2018, Entergy Arkansas proposed in its application to credit retail customers $66 million over six years, beginning in 2019. In February 2018, Entergy Arkansas filed supplemental testimony reducing the proposed retail customer credits to $39.6 million over six years. If the APSC, the FERC, and the NRC approvals are obtained, Entergy Arkansas expects the restructuring will be consummated on or before December 1, 2018.
It is currently contemplated that Entergy Arkansas would undertake a multi-step restructuring, which would include the following:
Entergy Arkansas would redeem its outstanding preferred stock at the aggregate redemption price of approximately $32.7 million, which includes call premiums, plus accumulated and unpaid dividends, if any.
Entergy Arkansas would convert from an Arkansas corporation to a Texas corporation.
Under the Texas Business Organizations Code (TXBOC), Entergy Arkansas will allocate substantially all of its assets to a new subsidiary, Entergy Arkansas Power, LLC, a Texas limited liability company (Entergy Arkansas Power), and Entergy Arkansas Power will assume substantially all of the liabilities of Entergy Arkansas, in a transaction regarded as a merger under the TXBOC. Entergy Arkansas will remain in existence and hold the membership interests in Entergy Arkansas Power.
Entergy Arkansas will contribute the membership interests in Entergy Arkansas Power to an affiliate (Entergy Utility Holding Company, LLC, a Texas limited liability company and subsidiary of Entergy Corporation). As a result of the contribution, Entergy Arkansas Power will be a wholly-owned subsidiary of Entergy Utility Holding Company, LLC.
Entergy Arkansas will change its name to Entergy Utility Property, Inc., and Entergy Arkansas Power will then change its name to Entergy Arkansas, LLC.

Upon the completion of the restructuring, Entergy Arkansas, LLC will hold substantially all of the assets, and will have assumed substantially all of the liabilities, of Entergy Arkansas. Entergy Arkansas may modify or supplement the steps to be taken to effectuate the restructuring.
Filings with the LPSC (Entergy Louisiana)

Retail Rates - Electric

2014 Formula Rate Plan Filing

In connection with the approval of the business combination of Entergy Gulf States Louisiana and Entergy Louisiana, the LPSC authorized the filing of a single, joint, formula rate plan evaluation report for Entergy Gulf States Louisiana’s and Entergy Louisiana’s 2014 calendar year operations. The joint evaluation report was filed in September 2015 and reflected an earned return on common equity of 9.09%. As such, no adjustment to base formula rate plan revenue was required. The following adjustments were required under the formula rate plan, however: a decrease in the additional capacity mechanism for Entergy Louisiana of $17.8 million; an increase in the additional capacity mechanism for Entergy Gulf States Louisiana of $4.3 million; and a reduction of $5.5 million to the MISO cost recovery mechanism to collect approximately $35.7 million on a combined-company basis. Under the order approving the business combination, following completion of the prescribed review period, rates were implemented with the first billing cycle of December 2015, subject to refund. See “Entergy Louisiana and Entergy Gulf States Louisiana Business Combination” below for further discussion of the business combination. In June 2017 the LPSC staff and Entergy Louisiana filed an unopposed joint report of proceedings, which was accepted by the LPSC in June 2017, finalizing the results of this proceeding with no changes to rates already implemented.

2015 Formula Rate Plan Filing

In May 2016, Entergy Louisiana filed its formula rate plan evaluation report for its 2015 calendar year operations. The evaluation report reflected an earned return on common equity of 9.07%. As such, no adjustment to base formula rate plan revenue was required. The following other adjustments, however, were required under the formula rate plan: an increase in the legacy Entergy Louisiana additional capacity mechanism of $14.2 million; a separate increase in legacy Entergy Louisiana revenue of $10 million primarily to reflect the effects of the termination of the System Agreement; an increase in the legacy Entergy Gulf States Louisiana additional capacity mechanism of $0.5 million; a decrease in legacy Entergy Gulf States Louisiana revenue of $58.7 million primarily to reflect the effects of the termination of the System Agreement; and an increase of $11 million to the MISO cost recovery mechanism. Rates were implemented with the first billing cycle of September 2016, subject to refund. Following implementation of the as-filed rates in September 2016, there were several interim updates to Entergy Louisiana’s formula rate plan, including the one submitted in December 2016, reflecting implementation of the settlement of the Waterford 3 replacement steam generator project prudence review described below. In June 2017 the LPSC staff and Entergy Louisiana filed a joint report of proceedings, which was accepted by the LPSC in June 2017, finalizing the results of the May 2016 evaluation report, interim updates, and corresponding proceedings with no changes to rates already implemented.

Extension of MISO Cost Recovery Mechanism Rider

In November 2016, Entergy Louisiana filed with the LPSC a request to extend the MISO cost recovery mechanism rider provision of its formula rate plan. In March 2017 the LPSC staff submitted direct testimony generally supportive of a one-year extension of the MISO cost recovery mechanism and the intervenor in the proceeding did not oppose an extension for this period of time. In July 2017 an uncontested joint stipulation authorizing a one-year extension of the MISO cost recovery mechanism rider was approved.

2016 Formula Rate Plan Filing

In May 2017, Entergy Louisiana filed its formula rate plan evaluation report for its 2016 calendar year operations. The evaluation report reflected an earned return on common equity of 9.84%. As such, no adjustment to base formula rate plan revenue was required. Adjustments, however, were required under the formula rate plan; the 2016 formula rate plan evaluation report showed a decrease in formula rate plan revenue of approximately $16.9 million, comprised of a decrease in legacy Entergy Louisiana formula rate plan revenue of $3.5 million, a decrease in legacy Entergy Gulf States Louisiana formula rate plan revenue of $9.7 million, and a decrease in incremental formula rate plan revenue of $3.7 million. Additionally, the formula rate plan evaluation report called for a decrease of $40.5 million in the MISO cost recovery revenue requirement from the present level of $46.8 million to $6.3 million. Rates reflecting these adjustments were implemented with the first billing cycle of September 2017, subject to refund. In September 2017 the LPSC issued its report indicating that no changes to Entergy Louisiana’s original formula rate plan evaluation report were required but reserved for several issues, including Entergy Louisiana’s September 2017 update to its formula rate plan evaluation report.

Formula Rate Plan Extension Request

In August 2017, Entergy Louisiana filed a request with the LPSC seeking to extend its formula rate plan for three years (2017-2019) with limited modifications to its terms.  Those modifications include: a one-time resetting of base rates to the midpoint of the band at Entergy Louisiana’s authorized return on equity of 9.95% for the 2017 test year; narrowing of the formula rate plan bandwidth from a total of 160 basis points to 80 basis points; and a forward-looking mechanism that would allow Entergy Louisiana to recover certain transmission-related costs contemporaneously with when those projects begin delivering benefits to customers.  Entergy Louisiana requested that the LPSC consider its request on an expedited basis, in an effort to maintain Entergy Louisiana’s current cycle for implementing rate adjustments, i.e., September 2018, without the need for filing a full base rate case proceeding. Several parties have intervened in the proceeding and all parties have been participating in settlement discussions.

Waterford 3 Replacement Steam Generator Project

Following the completion of the Waterford 3 replacement steam generator project, the LPSC undertook a prudence review in connection with a filing made by Entergy Louisiana in April 2013 with regard to the following aspects of the replacement project: 1) project management; 2) cost controls; 3) success in achieving stated objectives; 4) the costs of the replacement project; and 5) the outage length and replacement power costs. In July 2014 the LPSC staff filed testimony recommending potential project and replacement power cost disallowances of up to $71 million, citing a need for further explanation or documentation from Entergy Louisiana.  An intervenor filed testimony recommending disallowance of $141 million of incremental project costs, claiming the steam generator fabricator was imprudent.  Entergy Louisiana provided further documentation and explanation requested by the LPSC staff. An evidentiary hearing was held in December 2014. At the hearing the parties maintained the positions reflected in pre-filed testimony. Entergy Louisiana believed that the replacement steam generator costs were prudently incurred and applicable legal principles supported their recovery in rates.  Nevertheless, Entergy Louisiana recorded a write-off of $16 million of Waterford 3’s plant balance in December 2014 because of the uncertainty at the time associated with the resolution of the prudence review. In December 2015 the ALJ issued a proposed recommendation, which was subsequently finalized, concluding that Entergy Louisiana prudently managed the Waterford 3 replacement steam generator project, including the selection, use, and oversight of contractors, and could not reasonably have anticipated the damage to the steam generators. Nevertheless, the ALJ concluded that Entergy Louisiana was liable for the conduct of its contractor and subcontractor and, therefore, recommended a disallowance of $67 million in capital costs. Additionally, the ALJ concluded that Entergy Louisiana did not sufficiently justify the incurrence of $2 million in replacement power costs during the replacement outage. Although the ALJ’s recommendation had not yet been considered by the LPSC, after considering the progress of the proceeding in light of the ALJ recommendation, Entergy Louisiana recorded in the fourth quarter 2015 approximately $77 million in charges, including a $45 million asset write-off and a $32 million regulatory charge, to reflect that a portion of the assets associated with the Waterford 3 replacement steam generator project was no longer probable of recovery. Entergy Louisiana maintained that the ALJ’s recommendation contained significant factual and legal errors.

In October 2016 the parties reached a settlement in this matter. The settlement was approved by the LPSC in December 2016. The settlement effectively provided for an agreed-upon disallowance of $67 million of plant, which had been previously written off by Entergy Louisiana, as discussed above. The refund to customers of approximately $71 million as a result of the settlement approved by the LPSC was made to customers in January 2017. Of the $71 million of refunds, $68 million was credited to customers through Entergy Louisiana’s formula rate plan, outside of sharing, and $3 million through its fuel adjustment clause. Entergy Louisiana had previously recorded a provision of $48 million for this refund. The previously-recorded provision included the cumulative revenues recorded through December 2016 related to the $67 million of disallowed plant. An additional regulatory charge of $23 million was recorded in fourth quarter 2016 to reflect the effects of the settlement. The settlement also provided that Entergy Louisiana could retain the value associated with potential service credits agreed to by the project contractor, to the extent they are realized in the future. Following a review by the parties, an unopposed joint report of proceedings was filed by the LPSC staff and Entergy Louisiana in May 2017 and the LPSC accepted the joint report of proceedings resolving the matter.

Ninemile 6

In July 2014, Entergy Gulf States Louisiana and Entergy Louisiana filed an unopposed stipulation with the LPSC, which was subsequently approved, that estimated a first year revenue requirement associated with Ninemile 6 and provided a mechanism to update the revenue requirement as the in-service date approached. In late-December 2014, roughly contemporaneous with the unit's placement in service, a final updated estimated revenue requirement of $26.8 million for Entergy Gulf States Louisiana and $51.1 million for Entergy Louisiana was filed. The December 2014 estimate formed the basis of rates implemented effective with the first billing cycle of January 2015. In July 2015, Entergy Louisiana submitted to the LPSC a compliance filing including an estimate at completion, inclusive of interconnection costs and transmission upgrades, of approximately $648 million, or $76 million less than originally estimated, along with other project details and supporting evidence, to enable the LPSC to review the prudence of Entergy Louisiana’s management of the project. Testimony filed by the LPSC staff generally supported the prudence of the management of the project and recovery of the costs incurred to complete the project. The LPSC staff had questioned the warranty coverage for one element of the project. In October 2016 all parties agreed to a stipulation providing that 100% of Ninemile 6 construction costs was prudently incurred and is eligible for recovery from customers, but reserving the LPSC’s rights to review the prudence of Entergy Louisiana’s actions regarding one element of the project. This stipulation was approved by the LPSC in January 2017.

Union Power Station and Deactivation or Retirement Decisions for Entergy Louisiana Plants

In January 2015, Entergy Gulf States Louisiana filed its application with the LPSC for approval of the acquisition and cost recovery of two power blocks of the Union Power Station for an expected base purchase price of approximately $237 million per power block, subject to adjustments. In September 2015, Entergy Gulf States Louisiana agreed to settlement terms with all parties for Entergy Gulf States Louisiana’s purchase of the two power blocks. In October 2015 the LPSC voted unanimously to approve the uncontested settlement which finds, among other things, that acquisition of Power Blocks 3 and 4 is in the public interest and, therefore, prudent. The business combination of Entergy Gulf States Louisiana and Entergy Louisiana received regulatory approval and closed in October 2015 making Entergy Louisiana the named purchaser of Power Blocks 3 and 4 of the Union Power Station. In March 2016, Entergy Louisiana acquired Power Blocks 3 and 4 of Union Power Station for an aggregate purchase price of approximately $474 million and implemented rates to collect the estimated first-year revenue requirement with the first billing cycle of March 2016.

As a term of the LPSC-approved settlement authorizing the purchase of Power Blocks 3 and 4 of the Union Power Station, Entergy Louisiana agreed to make a filing with the LPSC to review its decisions to deactivate Ninemile 3 and Willow Glen 2 and 4 and its decision to retire Little Gypsy 1.  In January 2016, Entergy Louisiana made its compliance filing with the LPSC. Entergy Louisiana, LPSC staff, and intervenors participated in a technical conference in March 2016 where Entergy Louisiana presented information on its deactivation/retirement decisions for these four units in addition to information on the current deactivation decisions for the ten-year planning horizon. Parties have requested further proceedings on the prudence of the decision to deactivate Willow Glen 2 and 4.  No party contests the prudence of the decision to deactivate Willow Glen 2 and 4 or suggests reactivation of these units; however, issues have been raised related to Entergy Louisiana’s decision to give up its transmission service rights in MISO for Willow Glen 2 and 4 rather than placing the units into suspended status for the three-year term permitted by MISO. An evidentiary hearing was held in August 2017 and post-hearing briefs were submitted in October 2017. A decision is expected in 2018.

Retail Rates - Gas 

In accordance with the settlement of Entergy Gulf States Louisiana’s gas rate stabilization plan for the test year ended September 30, 2012, in August 2014, Entergy Gulf States Louisiana submitted for consideration a proposal for implementation of an infrastructure rider to recover expenditures associated with strategic plant investment and relocation projects mandated by local governments. After review by the LPSC staff and inclusion of certain customer safeguards required by the LPSC staff, in December 2014, Entergy Gulf States Louisiana and the LPSC staff submitted a joint settlement for implementation of an accelerated gas pipe replacement program providing for the replacement of approximately 100 miles of pipe over the next ten years, as well as relocation of certain existing pipe resulting from local government-related infrastructure projects, and for a rider to recover the investment associated with these projects. The rider allows for recovery of approximately $65 million over ten years. The rider recovery will be adjusted on a quarterly basis to include actual investment incurred for the prior quarter and is subject to the following conditions, among others: a ten-year term; application of any earnings in excess of 10.45% as an offset to the revenue requirement of the infrastructure rider; adherence to a specified spending plan, within plus or minus 20% annually; annual filings comparing actual versus planned rider spending with actual spending and explanation of variances exceeding 10%; and an annual true-up. The joint settlement was approved by the LPSC in January 2015. Implementation of the infrastructure rider commenced with bills rendered on and after the first billing cycle of April 2015.

2014 Rate Stabilization Plan Filing

In January 2015, Entergy Gulf States Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2014.  The filing showed an earned return on common equity of 7.20%, which resulted in a $706 thousand rate increase.  In April 2015 the LPSC issued findings recommending two adjustments to Entergy Gulf States Louisiana’s as-filed results, and an additional recommendation that did not affect the results. The LPSC staff’s recommended adjustments increase the earned return on equity for the test year to 7.24%. Entergy Gulf States Louisiana accepted the LPSC staff’s recommendations and a revenue increase of $688 thousand was implemented with the first billing cycle of May 2015.

2015 Rate Stabilization Plan Filing

In January 2016, Entergy Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2015. The filing showed an earned return on common equity of 10.22%, which is within the authorized bandwidth, therefore requiring no change in rates. In March 2016 the LPSC staff issued its report stating that the 2015 gas rate stabilization plan filing was in compliance with the exception of several issues that required additional information, explanation, or clarification for which the LPSC staff had reserved the right to further review. In July 2016 the parties to the proceeding filed an unopposed joint report and motion for entry of order accepting the report that indicated no outstanding issues remained in the filing.

In February 2016, Entergy Louisiana filed a motion requesting to extend the term of the gas rate stabilization plan in substantially similar form for an additional three-year term and included a request for sharing of non-jurisdictional compressed natural gas revenues. Following discovery and the filing of testimony by the LPSC staff, Entergy Louisiana and the LPSC submitted a joint motion for hearing an uncontested stipulated settlement resolving the proceeding. A hearing on the stipulation was held in November 2016. The ALJ issued a report of proceedings that was presented with the parties’ stipulation to the LPSC for consideration. The stipulation approving Entergy Louisiana’s requested extension of the rate stabilization plan was approved by the LPSC in December 2016.

2016 Rate Stabilization Plan Filing

In January 2017, Entergy Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2016. The filing of the evaluation report for test year 2016 reflected an earned return on common equity of 6.37%. As part of the original filing, pursuant to the extraordinary cost provision of the rate stabilization plan, Entergy Louisiana sought to recover approximately $1.5 million in deferred operation and maintenance expenses incurred to restore service and repair damage resulting from flooding and widespread rainfall in southeast Louisiana that occurred in August 2016. Entergy Louisiana requested to recover the prudently incurred August 2016 storm restoration costs over ten years, outside of the rate stabilization plan sharing provisions. As a result, Entergy Louisiana’s filing sought an annual increase in revenue of $1.4 million. Following review of the filing, except for the proposed extraordinary cost recovery, the LPSC staff confirmed Entergy Louisiana’s filing was consistent with the principles and requirements of the rate stabilization plan. The extraordinary cost recovery request associated with the 2016 flood-related deferred operation and maintenance expenses incurred for gas operations was removed from the rate stabilization plan pending LPSC consideration in a separate docket. In April 2017 the LPSC approved a joint report of proceedings and Entergy Louisiana submitted a revised evaluation report reflecting a $1.2 million annual increase in revenue with rates implemented with the first billing cycle of May 2017.

In connection with the joint report of proceedings accepted by the LPSC, in May 2017, Entergy Louisiana filed an application to initiate a separate proceeding to recover through the extraordinary cost provision of the gas rate stabilization plan the deferred operation and maintenance expenses of $1.4 million incurred to restore service and repair damage resulting from flooding and widespread rainfall in southeast Louisiana that occurred in August 2016. The LPSC staff submitted its direct testimony in the proceeding recommending recovery of $0.9 million. Entergy Louisiana filed rebuttal testimony responding to the LPSC staff’s recommendation. The procedural schedule was suspended to allow the parties to engage in settlement negotiations, and in February 2018 the LPSC staff and Entergy Louisiana filed an unopposed settlement. If approved by the LPSC, the settlement would provide for Entergy Louisiana to recover, over ten years, the approximately $1.4 million in deferred operation and maintenance expense and related carrying charges. The settlement further provides for recovery to commence in May 2018.

2017 Rate Stabilization Plan Filing

In January 2018, Entergy Louisiana filed with the LPSC its gas rate stabilization plan for test year ended September 30, 2017.  The filing of the evaluation report for the test year 2017 reflected an earned return on common equity of 9.06%.  This earned return is below the earnings sharing band of the rate stabilization plan and results in a rate increase of $0.1 million.  Due to the enactment in late-December 2017 of the Tax Cuts and Jobs Act, Entergy Louisiana did not have adequate time to reflect the effects of this tax legislation in the rate stabilization plan.  As a result, Entergy Louisiana will file a supplement to the January 2018 evaluation report to reflect, among other things, a 21% federal corporate income tax rate.  Any rate change resulting from the revised rate stabilization plan will become effective in rates in May 2018.

Filings with the MPSC (Entergy Mississippi)

Formula Rate Plan Filings

In March 2016, Entergy Mississippi submitted its formula rate plan 2016 test year filing showing Entergy Mississippi’s projected earned return for the 2016 calendar year to be below the formula rate plan bandwidth. The filing showed a $32.6 million rate increase was necessary to reset Entergy Mississippi’s earned return on common equity to the specified point of adjustment of 9.96%, within the formula rate plan bandwidth. In June 2016 the MPSC approved Entergy Mississippi’s joint stipulation with the Mississippi Public Utilities Staff. The joint stipulation provided for a total revenue increase of $23.7 million. The revenue increase includes a $19.4 million increase through the formula rate plan, resulting in a return on common equity point of adjustment of 10.07%. The revenue increase also includes $4.3 million in incremental ad valorem tax expenses to be collected through an updated ad valorem tax adjustment rider. The revenue increase and ad valorem tax adjustment rider were effective with the July 2016 bills.

In March 2017, Entergy Mississippi submitted its formula rate plan 2017 test year filing and 2016 look-back filing showing Entergy Mississippi’s earned return for the historical 2016 calendar year and projected earned return for the 2017 calendar year to be within the formula rate plan bandwidth, resulting in no change in rates. In June 2017, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a stipulation that confirmed that Entergy Mississippi’s earned returns for both the 2016 look-back filing and 2017 test year were within the respective formula rate plan bandwidths. In June 2017 the MPSC approved the stipulation, which resulted in no change in rates.

Filings with the City Council (Entergy New Orleans)

Retail Rates

See “Algiers Asset Transfer” below for discussion of the Algiers asset transfer. As a provision of the settlement agreement approved by the City Council in May 2015 providing for the Algiers asset transfer, it was agreed that, with limited exceptions, no action may be taken with respect to Entergy New Orleans’s base rates until rates are implemented from a base rate case that must be filed for its electric and gas operations in 2018. This provision eliminated the formula rate plan applicable to Algiers operations. The limited exceptions included continued implementation of the then-remaining two years of the four-year phased-in rate increase for the Algiers area and certain exceptional cost increases or decreases in the base revenue requirement. An additional provision of the settlement agreement allowed for continued recovery of the revenue requirement associated with the capacity and energy from Ninemile 6 received by Entergy New Orleans under a power purchase agreement with Entergy Louisiana (Algiers PPA). The settlement authorized Entergy New Orleans to recover the remaining revenue requirement related to the Algiers PPA through base rates charged to Algiers customers. The settlement also provided for continued implementation of the Algiers MISO recovery rider.

In addition to the Algiers PPA, Entergy New Orleans has a separate power purchase agreement with Entergy Louisiana for 20% of the capacity and energy from Ninemile 6 (Ninemile PPA), which commenced operation in December 2014. Initially, recovery of the non-fuel costs associated with the Ninemile PPA was authorized through a special Ninemile 6 rider billed only to Entergy New Orleans customers outside of Algiers.

In August 2015, Entergy New Orleans filed an application with the City Council seeking authorization to proceed with the purchase of Union Power Block 1, with an expected base purchase price of approximately $237 million, subject to adjustments, and seeking approval of the recovery of the associated costs. In November 2015 the City Council issued written resolutions and an order approving an agreement in principle between Entergy New Orleans and City Council advisors providing that the purchase of Union Power Block 1 and related assets by Entergy New Orleans is prudent and in the public interest. The City Council authorized expansion of the terms of the purchased power and capacity acquisition cost recovery rider to recover the non-fuel purchased power expense from Ninemile 6, the revenue requirement associated with the purchase of Power Block 1 of the Union Power Station, and a credit to customers of $400 thousand monthly beginning June 2016 in recognition of the decrease in other operation and maintenance expenses that would result with the deactivation of Michoud Units 2 and 3. In March 2016, Entergy New Orleans purchased Power Block 1 of the Union Power Station for approximately $237 million and initiated recovery of these costs with March 2016 bills. In July 2016, Entergy New Orleans and the City Council Utility Committee agreed to a temporary increase in the Michoud credit to customers to a total of $1.4 million monthly for August 2016 through December 2016.

A 2008 rate case settlement included $3.1 million per year in electric rates to fund the Energy Smart energy efficiency programs.  The rate settlement provided an incentive for Entergy New Orleans to meet or exceed energy savings targets set by the City Council and provided a mechanism for Entergy New Orleans to recover lost contribution to fixed costs associated with the energy savings generated from the energy efficiency programs. In January 2015 the City Council approved funding for the Energy Smart program from April 2015 through March 2017 using the remainder of the approximately $12.8 million of 2014 rough production cost equalization funds, with any remaining costs being recovered through the fuel adjustment clause. This funding methodology was modified in November 2015 when the City Council directed Entergy New Orleans to use a combination of guaranteed customer savings related to a prior agreement with the City Council and rough production cost equalization funds to cover program costs prior to recovering any costs through the fuel adjustment clause. In April 2017 the City Council approved an implementation plan for the Energy Smart program from April 2017 through December 2019. The City Council directed that the $11.8 million balance reported for Energy Smart funds be used to continue funding the program for Entergy New Orleans’s legacy customers and that the Energy Smart Algiers program continue to be funded through the Algiers fuel adjustment clause, until additional customer funding is required for the legacy customers. In September 2017, Entergy New Orleans filed a supplemental plan and proposed several options for an interim cost recovery mechanism necessary to recover program costs during the period between when existing funds directed to Energy Smart programs are depleted (estimated to be June 2018) and when new rates from the anticipated 2018 combined rate case, which will include a cost recovery mechanism for Energy Smart funding, take effect (estimated to be August 2019). Entergy New Orleans requested that the City Council approve a cost recovery mechanism prior to June 2018. In December 2017 the City Council approved an energy efficiency cost recovery rider as an interim funding mechanism for Energy Smart, subject to verification that no additional funding sources exist.

Internal Restructuring

In July 2016, Entergy New Orleans filed an application with the City Council seeking authorization to undertake a restructuring that would result in the transfer of substantially all of the assets and operations of Entergy New Orleans, Inc. to a new entity, which would ultimately be owned by an existing Entergy subsidiary holding company. The restructuring was subject to regulatory review and approval by the City Council and the FERC. In May 2017 the City Council adopted a resolution approving the proposed internal restructuring pursuant to an agreement in principle with the City Council advisors and certain intervenors. Pursuant to the agreement in principle, Entergy New Orleans would credit retail customers $10 million in 2017, $1.4 million in the first quarter of the year after the transaction closes, and $117,500 each month in the second year after the transaction closes until such time as new base rates go into effect as a result of the anticipated 2018 base rate case. Entergy New Orleans began crediting retail customers in June 2017. In June 2017 the FERC approved the transaction and, pursuant to the agreement in principle, Entergy New Orleans will provide additional credits to retail customers of $5 million in each of the years 2018, 2019, and 2020.

In November 2017, pursuant to the agreement in principle, Entergy New Orleans undertook a multi-step restructuring, including the following:

Entergy New Orleans, Inc. redeemed its outstanding preferred stock at a price of approximately $21 million, which included a call premium of approximately $819,000, plus any accumulated and unpaid dividends.
Entergy New Orleans, Inc. converted from a Louisiana corporation to a Texas corporation.
Under the Texas Business Organizations Code (TXBOC), Entergy New Orleans, Inc. allocated substantially all of its assets to a new subsidiary, Entergy New Orleans Power, LLC, a Texas limited liability company (Entergy New Orleans Power), and Entergy New Orleans Power assumed substantially all of the liabilities of Entergy New Orleans, Inc., in a transaction regarded as a merger under the TXBOC. Entergy New Orleans, Inc. remained in existence and held the membership interests in Entergy New Orleans Power.
Entergy New Orleans, Inc. contributed the membership interests in Entergy New Orleans Power to an affiliate (Entergy Utility Holding Company, LLC, a Texas limited liability company and subsidiary of Entergy Corporation). As a result of the contribution, Entergy New Orleans Power is a wholly-owned subsidiary of Entergy Utility Holding Company, LLC.

In December 2017, Entergy New Orleans, Inc. changed its name to Entergy Utility Group, Inc., and Entergy New Orleans Power then changed its name to Entergy New Orleans, LLC. Entergy New Orleans, LLC holds substantially all of the assets, and has assumed substantially all of the liabilities, of Entergy New Orleans, Inc. The restructuring was accounted for as a transaction between entities under common control.

Filings with the PUCT and Texas Cities (Entergy Texas)

Retail Rates

2011 Rate Case

In November 2011, Entergy Texas filed a rate case requesting a $112 million base rate increase reflecting a 10.6% return on common equity based on an adjusted June 2011 test year.  The rate case also proposed a purchased power recovery rider.  On January 12, 2012, the PUCT voted not to address the purchased power recovery rider in the rate case, but the PUCT voted to set a baseline in the rate case proceeding that would be applicable if a purchased power capacity rider is approved in a separate proceeding.  In April 2012 the PUCT Staff filed direct testimony recommending a base rate increase of $66 million and a 9.6% return on common equity.  The PUCT Staff, however, subsequently filed a statement of position in the proceeding indicating that it was still evaluating the position it would ultimately take in the case regarding Entergy Texas’s recovery of purchased power capacity costs and Entergy Texas’s proposal to defer its MISO transition expenses.  In April 2012, Entergy Texas filed rebuttal testimony indicating a revised request for a $105 million base rate increase.  A hearing was held in late-April through early-May 2012.

In September 2012 the PUCT issued an order approving a $28 million rate increase, effective July 2012.  The order included a finding that “a return on common equity (ROE) of 9.80 percent will allow [Entergy Texas] a reasonable opportunity to earn a reasonable return on invested capital.”  The order also provided for increases in depreciation rates and the annual storm reserve accrual.  The order also reduced Entergy Texas’s proposed purchased power capacity costs, stating that they are not known and measurable; reduced Entergy Texas’s regulatory assets associated with Hurricane Rita; excluded from rate recovery capitalized financially-based incentive compensation; included $1.6 million of MISO transition expense in base rates; and reduced Entergy’s Texas’s fuel reconciliation recovery by $4 million because the PUCT disagreed with the line-loss factor used in the calculation.  After considering the progress of the proceeding in light of the PUCT order, Entergy Texas recorded in the third quarter 2012 an approximate $24 million charge to recognize that assets associated with Hurricane Rita, financially-based incentive compensation, and fuel recovery are no longer probable of recovery.  Entergy Texas believed that it was entitled to recover these prudently incurred costs, however, and it filed a motion for rehearing regarding these and several other issues in the PUCT’s order on October 4, 2012.  Several other parties also filed motions for rehearing of the PUCT’s order.  The PUCT subsequently denied rehearing of substantive issues.  Several parties, including Entergy Texas, appealed various aspects of the PUCT’s order to the Travis County District Court. A hearing was held in July 2014. In October 2014 the Travis County District Court issued an order upholding the PUCT’s decision except as to the line-loss factor issue referenced above, which was found in favor of Entergy Texas. In November 2014, Entergy Texas and other parties, including the PUCT, appealed the Travis County District Court decision to the Third Court of Appeals. Oral argument before the court panel was held in September 2015. In April 2016 the Third Court of Appeals issued its opinion affirming the District Court’s decision on all points. Entergy Texas petitioned the Texas Supreme Court to hear its appeal of the Third Court’s ruling. In September 2017 the Texas Supreme Court denied the petitions for review. Entergy Texas filed a motion for rehearing of the Texas Supreme Court’s denial of the petition for review. In January 2018 the Texas Supreme Court denied Entergy Texas’s motion for rehearing.

Distribution cost recovery factor (DCRF) rider

In September 2015, Entergy Texas filed to amend its DCRF rider. Entergy Texas requested an increase in recovery under the rider of $6.5 million, for a total collection of $10.1 million annually from retail customers. In October 2015 intervenors and PUCT staff filed testimony opposing, in part, Entergy Texas’s request. In November 2015, Entergy Texas and the parties filed an unopposed settlement agreement and supporting documents. The settlement established an annual revenue requirement of $8.65 million for the amended DCRF rider, with the resulting rates effective for usage on and after January 1, 2016. The PUCT approved the settlement agreement in February 2016.

In June 2017, Entergy Texas filed an application to amend its DCRF rider by increasing the total collection from $8.65 million to approximately $19 million. In July 2017, Entergy Texas, the PUCT, and the two other parties in the proceeding entered into an unopposed stipulation and settlement agreement resulting in an amended DCRF annual revenue requirement of $18.3 million, with the resulting rates effective for usage no later than October 1, 2017. In September 2017 the PUCT issued its final order approving the unopposed stipulation and settlement agreement. The amended DCRF rider rates became effective for usage on and after September 1, 2017.
    
Transmission cost recovery factor (TCRF) rider

In September 2015, Entergy Texas filed for a TCRF rider requesting a $13 million increase, incremental to base rates. Testimony was filed in November 2015, with the PUCT staff and other parties proposing various disallowances involving, among other things, MISO charges, vegetation management costs, and bad debt expenses that would reduce the requested increase by approximately $2 million. In addition to those recommended disallowances, a number of parties recommended that Entergy Texas’s request be reduced by an additional $3.4 million to account for load growth since base rates were last set. A hearing on the merits was held in December 2015. In February 2016 a State Office of Administrative Hearings ALJ issued a proposal for decision recommending that the PUCT disallow approximately $2 million from Entergy Texas’s $13 million request, but recommending that the PUCT not accept the load growth offset. In June 2016 the PUCT indicated that it would take up in a future rulemaking project the issue of whether a load growth adjustment should apply to a TCRF. In July 2016 the PUCT issued an order generally accepting the proposal for decision but declining to adjust the TCRF baseline in two instances as recommended by the ALJ, which resulted in a total annual allowance of approximately $10.5 million. The PUCT also ordered its staff and Entergy Texas to track all spare autotransformer transfers going forward so that it could address the appropriate accounting treatment and prudence of such transfers in Entergy Texas’s next base rate case. Entergy Texas implemented the TCRF rider beginning with September 2016 bills.

In September 2016, Entergy Texas filed with the PUCT a request to amend its TCRF rider. The proposed amended TCRF rider is designed to collect approximately $29.5 million annually from Entergy Texas’s retail customers. This amount includes the approximately $10.5 million annually that Entergy Texas is currently authorized to collect through the TCRF rider, as discussed above. In December 2016, concurrent with the 2016 fuel reconciliation stipulation and settlement agreement discussed above, Entergy Texas and the PUCT reached a settlement agreeing to the amended TCRF annual revenue requirement of $29.5 million. As discussed above, the terms of the two settlements are interdependent. The PUCT approved the settlement and issued a final order in March 2017. Entergy Texas implemented the amended TCRF rider beginning with bills covering usage on and after March 20, 2017.

Advanced Metering Infrastructure (AMI) Filings

Entergy Arkansas

In September 2016, Entergy Arkansas filed an application seeking a finding from the APSC that Entergy Arkansas’s deployment of AMI is in the public interest. Entergy Arkansas proposed to replace existing meters with advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems. AMI is intended to serve as the foundation of Entergy Arkansas’s modernized power grid. The filing included an estimate of implementation costs for AMI of $208 million. The filing identified a number of quantified and unquantified benefits, and Entergy Arkansas provided a cost benefit analysis showing that its AMI deployment is expected to produce a nominal net benefit to customers of $406 million. Entergy Arkansas also sought to continue to include in rate base the remaining book value of existing meters, which was approximately $57 million at December 31, 2015, that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates. Entergy Arkansas proposed a 15-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019. Deployment of the communications network is expected to begin in 2018. Entergy Arkansas proposed to include the AMI deployment costs and the quantified benefits in future formula rate plan filings, and the 2018 costs were approved in the 2017 formula rate plan filing. In June 2017 the APSC staff and Arkansas Attorney General filed direct testimony. The APSC staff generally supported Entergy Arkansas’s AMI deployment conditioned on various recommendations. The Arkansas Attorney General’s consultant primarily recommended denial of Entergy Arkansas’s application but alternatively suggested recommendations in the event the APSC approves Entergy Arkansas’s proposal. Entergy Arkansas filed rebuttal testimony in June 2017, substantially accepting the APSC staff’s recommendations. In August 2017, Entergy Arkansas and the parties to the proceeding filed a joint motion to approve a unanimous settlement agreement. In October 2017 the APSC issued an order finding that Entergy Arkansas’s AMI deployment is in the public interest and approving the settlement agreement subject to a minor modification. Entergy Arkansas expects to recover the undepreciated balance of its existing meters through a regulatory asset to be amortized over 15 years. Entergy Arkansas has begun discussions with the other parties to implement the items in the settlement agreement including pre-pay and time of use programs.

Entergy Louisiana

In November 2016, Entergy Louisiana filed an application seeking a finding from the LPSC that Entergy Louisiana’s deployment of advanced electric and gas metering infrastructure is in the public interest. Entergy Louisiana proposed to deploy advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems. AMI is intended to serve as the foundation of Entergy Louisiana’s modernized power grid. The filing included an estimate of implementation costs for AMI of $330 million. The filing identified a number of quantified and unquantified benefits, and Entergy Louisiana provided a cost/benefit analysis showing that its combined electric and gas AMI deployment is expected to produce a nominal net benefit to customers of $607 million. Entergy Louisiana also sought to continue to include in rate base the remaining book value, approximately $92 million at December 31, 2015, of the existing electric meters and also to depreciate those assets using current depreciation rates. Entergy Louisiana proposed a 15-year useful life for the new advanced meters, the three-year deployment of which is expected to begin in 2019. The communications network deployment is expected to begin by late-2018, after the necessary information technology infrastructure is in place. Entergy Louisiana proposed to recover the cost of AMI through the implementation of a customer charge, net of certain benefits, phased in over the period 2019 through 2022. The parties reached an uncontested stipulation permitting implementation of Entergy Louisiana’s proposed AMI system, with modifications to the proposed customer charge. In July 2017 the LPSC approved the stipulation. Entergy Louisiana expects to recover the undepreciated balance of its existing meters through a regulatory asset to be amortized at current depreciation rates.

Entergy Mississippi

In November 2016, Entergy Mississippi filed an application seeking an order from the MPSC granting a certificate of public convenience and necessity and finding that Entergy Mississippi’s deployment of AMI is in the public interest. Entergy Mississippi proposed to replace existing meters with advanced meters that enable two-way data communication; to design and build a secure and reliable network to support such communications; and to implement support systems. AMI is intended to serve as the foundation of Entergy Mississippi’s modernized power grid. The filing included an estimate of implementation costs for AMI of $132 million. The filing identified a number of quantified and unquantified benefits, and Entergy Mississippi provided a cost benefit analysis showing that its AMI deployment is expected to produce a nominal benefit to customers of $496 million over a 15-year period, which when netted against the costs of AMI results in $183 million of net customer benefits. Entergy Mississippi also sought to continue to include in rate base the remaining book value, approximately $56 million at December 31, 2015, of existing meters that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates. Entergy Mississippi proposed a 15-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019, subject to approval by the MPSC, with deployment of the communications network expected to begin in 2018. Entergy Mississippi proposed to include the AMI deployment costs and the quantified benefits in existing rate mechanisms, primarily through future formula rate plan filings and/or future energy cost recovery rider schedule re-determinations, as applicable. In May 2017 the Mississippi Public Utilities Staff and Entergy Mississippi entered into and filed a joint stipulation supporting Entergy Mississippi’s filing, and the MPSC issued an order approving the filing without material changes, finding that Entergy Mississippi’s deployment of AMI is in the public interest and granting a certificate of public convenience and necessity. The MPSC order also confirmed that Entergy Mississippi shall continue to include in rate base the remaining book value of existing meters that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates.

Entergy New Orleans

In October 2016, Entergy New Orleans filed an application seeking a finding from the City Council that Entergy New Orleans’s deployment of advanced electric and gas metering infrastructure is in the public interest.  Entergy New Orleans proposed to deploy advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems.  AMI is intended to serve as the foundation of Entergy New Orleans’s modernized power grid.  The filing included an estimate of implementation costs for AMI of $75 million. The filing identified a number of quantified and unquantified benefits, and Entergy New Orleans provided a cost/benefit analysis showing that its combined electric and gas AMI deployment is expected to produce a nominal net benefit to customers of $101 million.  Entergy New Orleans also sought to continue to include in rate base the remaining book value, approximately $21 million at December 31, 2015, of the existing electric meters and also to depreciate those assets using current depreciation rates.  Entergy New Orleans proposed a 15-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019.  Deployment of the information technology infrastructure began in 2017 and deployment of the communications network is expected to begin in 2018.  Entergy New Orleans proposed to recover the cost of AMI through the implementation of a customer charge, net of certain benefits, phased in over the period 2019 through 2022.  The City Council’s advisors filed testimony in May 2017 recommending the adoption of AMI subject to certain modifications, including the denial of Entergy New Orleans’s proposed customer charge as a cost recovery mechanism. In January 2018 a settlement was reached between the City Council’s advisors and Entergy New Orleans. In February 2018 the City Council approved the settlement, which deferred cost recovery to the 2018 Entergy New Orleans rate case, but also stated that an adjustment for 2018-2019 AMI costs can be filed in the rate case and that, for all subsequent AMI costs, the mechanism to be approved in the 2018 rate case will allow for the timely recovery of such costs.

Entergy Texas

In April 2017 the Texas legislature enacted legislation that extends statutory support for AMI deployment to Entergy Texas and directs that if Entergy Texas elects to deploy AMI, it shall do so as rapidly as practicable. In July 2017, Entergy Texas filed an application seeking an order from the PUCT approving Entergy Texas’s deployment of AMI. Entergy Texas proposed to replace existing meters with advanced meters that enable two-way data communication; design and build a secure and reliable network to support such communications; and implement support systems. AMI is intended to serve as the foundation of Entergy Texas’s modernized power grid. The filing included an estimate of implementation costs for AMI of $132 million. The filing identified a number of quantified and unquantified benefits, with Entergy Texas showing that its AMI deployment is expected to produce nominal net operational cost savings to customers of $33 million. Entergy Texas also sought to continue to include in rate base the remaining book value, approximately $41 million at December 31, 2016, of existing meters that will be retired as part of the AMI deployment and also to depreciate those assets using current depreciation rates. Entergy Texas proposed a seven-year depreciable life for the new advanced meters, the three-year deployment of which is expected to begin in 2019. Entergy Texas also proposed a surcharge tariff to recover the reasonable and necessary costs it has and will incur under the deployment plan for the full deployment of advanced meters. Further, Entergy Texas sought approval of fees that would be charged to customers who choose to opt out of receiving service through an advanced meter and instead receive electric service with a non-standard meter. In October 2017, Entergy Texas and other parties entered into and filed an unopposed stipulation and settlement agreement, permitting deployment of AMI with limited modifications. The PUCT approved the stipulation and settlement agreement in December 2017. Consistent with the approval, deployment of the communications network is expected to begin in 2018. Entergy Texas expects to recover the remaining net book value of its existing meters through a regulatory asset to be amortized at current depreciation rates.

Entergy Louisiana and Entergy Gulf States Louisiana Business Combination

Entergy Louisiana and Entergy Gulf States Louisiana filed an application with the LPSC in September 2014 seeking authorization to undertake transactions that would result in the combination of Entergy Louisiana and Entergy Gulf States Louisiana into a single public utility. An uncontested stipulated settlement (stipulated settlement) was filed with the LPSC in July 2015. Through the stipulated settlement, the parties agreed to terms upon which to recommend that the LPSC find that the business combination was in the public interest. The stipulated settlement, which was either joined, or unopposed, by all parties to the LPSC proceeding, represented a compromise of stakeholder positions and was the result of an extensive period of analysis, discovery, and negotiation. The stipulated settlement provided $107 million in guaranteed customer benefits during the first nine years following the transaction’s close. Additionally, the combined company would honor the 2013 Entergy Louisiana and Entergy Gulf States Louisiana rate case settlements, including the commitments that (1) there would be no rate increase for legacy Entergy Gulf States Louisiana customers for the 2014 test year, and (2) through the 2016 test year formula rate plan, Entergy Louisiana (as a combined entity) would not raise rates by more than $30 million, net of the $10 million rate increase included in the Entergy Louisiana legacy formula rate plan. The stipulated settlement also provided that Entergy Gulf States Louisiana and Entergy Louisiana would be permitted to defer certain external costs that were incurred to achieve the business combination’s customer benefits. In 2015 deferrals of $16 million for these external costs were recorded, and they are being amortized over a 10-year period. The LPSC approved the business combination in August 2015.

On October 1, 2015, the businesses formerly conducted by Entergy Louisiana and Entergy Gulf States Louisiana were combined into a single public utility. With the completion of the business combination, Entergy Louisiana holds substantially all of the assets, and has assumed the liabilities, of Entergy Louisiana and Entergy Gulf States Louisiana. The combination was accounted for as a transaction between entities under common control. See Note 3 to the financial statements for further discussion of the customer credits resulting from the business combination.

Algiers Asset Transfer (Entergy Louisiana and Entergy New Orleans)

In October 2014, Entergy Louisiana and Entergy New Orleans filed an application with the City Council seeking authorization to undertake a transaction that would result in the transfer from Entergy Louisiana to Entergy New Orleans of certain assets that supported the provision of service to Entergy Louisiana’s customers in Algiers. In April 2015 the FERC issued an order approving the Algiers assets transfer. In May 2015 the parties filed a settlement agreement authorizing the Algiers assets transfer and the settlement agreement was approved by a City Council resolution in May 2015. On September 1, 2015, Entergy Louisiana transferred its Algiers assets to Entergy New Orleans for a purchase price of approximately $85 million. Entergy New Orleans paid Entergy Louisiana $59.6 million, including final true-ups, from available cash and issued a note payable to Entergy Louisiana in the amount of $25.5 million.

System Agreement Cost Equalization Proceedings

Prior to its final termination in 2016, the Utility operating companies historically engaged in the coordinated planning, construction, and operation of generating and bulk transmission facilities under the terms of the System Agreement.  Entergy Arkansas terminated its participation in the System Agreement in December 2013. Entergy Mississippi terminated its participation in the System Agreement in November 2015. The System Agreement terminated with respect to its remaining participants in August 2016.

Although the System Agreement has terminated, certain of the Utility operating companies’ retail regulators continue to pursue litigation involving the System Agreement at the FERC and in federal courts.  The proceedings include challenges to the allocation of costs as defined by the System Agreement and other matters.

In June 2005 the FERC issued a decision in System Agreement litigation that had been commenced by the LPSC, and essentially affirmed its decision in a December 2005 order on rehearing.  The decision included, among other things:

The FERC’s conclusion that the System Agreement no longer roughly equalizes total production costs among the Utility operating companies.
In order to reach rough production cost equalization, the FERC imposed a bandwidth remedy by which each company’s total annual production costs will have to be within +/- 11% of Entergy System average total annual production costs.
In calculating the production costs for this purpose under the FERC’s order, output from the Vidalia hydroelectric power plant will not reflect the actual Vidalia price for the year but is priced at that year’s average price paid by Entergy Louisiana for the exchange of electric energy under Service Schedule MSS-3 of the System Agreement, thereby reducing the amount of Vidalia costs reflected in the comparison of the Utility operating companies’ total production costs.
The remedy ordered by the FERC in 2005 required no refunds and became effective based on calendar year 2006 production costs and the first reallocation payments were made in 2007.
The FERC’s decision reallocated total production costs of the Utility operating companies whose relative total production costs expressed as a percentage of Entergy System average production costs are outside an upper or lower bandwidth.  This was accomplished by payments from Utility operating companies whose production costs were more than 11% below Entergy System average production costs to Utility operating companies whose production costs were more than the Entergy System average production cost, with payments going first to those Utility operating companies whose total production costs were farthest above the Entergy System average.

The LPSC, APSC, MPSC, and the Arkansas Electric Energy Consumers appealed the FERC’s December 2005 decision to the United States Court of Appeals for the D.C. Circuit.  Entergy and the City of New Orleans intervened in the various appeals.  The D.C. Circuit issued its decision in April 2008.  The D.C. Circuit concluded that the FERC’s orders had failed to adequately explain both its conclusion that it was prohibited from ordering refunds for the 20-month period from September 13, 2001 - May 2, 2003 and its determination to implement the bandwidth remedy commencing on January 1, 2006, rather than June 1, 2005.  The D.C. Circuit remanded the case to the FERC for further proceedings on those two issues.

In October 2011 the FERC issued an order addressing the D.C. Circuit remand on the two issues.  On the first issue, the FERC concluded that it did have the authority to order refunds, but decided that it would exercise its equitable discretion and not require refunds for the 20-month period from September 13, 2001 - May 2, 2003.  Because the ruling on refunds relied on findings in the interruptible load proceeding, which is discussed in a separate section below, the FERC concluded that this refund ruling will be held in abeyance pending the outcome of the rehearing requests in the interruptible load proceeding.  On the second issue, the FERC reversed its prior decision and ordered that the prospective bandwidth remedy begin on June 1, 2005 (the date of its initial order in the proceeding) rather than January 1, 2006, as it had previously ordered.  Pursuant to the October 2011 order, Entergy was required to calculate bandwidth payments for the period June - December 2005 utilizing the bandwidth formula tariff prescribed by the FERC that was filed in a December 2006 compliance filing and accepted by the FERC in an April 2007 order.  

In March 2015, in light of a December 2014 decision by the D.C. Circuit in the interruptible load proceeding, Entergy filed with the FERC a motion to establish a briefing schedule on refund issues and an initial brief addressing refund issues. The initial brief argued that the FERC, in response to the D.C. Circuit decision, should clarify its policy on refunds and find that refunds are not required in this proceeding. In October 2015 the FERC issued three orders related to the commencement of the remedy on June 1, 2005 and the inclusion of interest for the period June 1, 2005 through December 31, 2005. Specifically, the FERC rejected Entergy’s request for rehearing of its decision to include interest for the seven-month period. The FERC also rejected Entergy’s request for rehearing of the order rejecting the compliance filing with regard to the issue of interest. Finally, the FERC set for hearing and settlement procedures the 2014 compliance filing that included the bandwidth calculation for the seven months June 1, 2005 through December 31, 2005. In setting the compliance filing for hearing, the FERC rejected the APSC’s protest that Entergy Arkansas should not be subject to the filing because Entergy Arkansas would be making the payments during a period following its exit from the System Agreement. In January 2018 the D.C.Circuit affirmed the FERC decision that Entergy Arkansas was subject to the filing.

In December 2011, Entergy filed with the FERC its compliance filing that provides the payments and receipts among the Utility operating companies pursuant to the FERC’s October 2011 order.  The APSC, the LPSC, the PUCT, and other parties intervened in the December 2011 compliance filing proceeding, and the APSC and the LPSC also filed protests. The filing shows the following payments/receipts among the Utility operating companies:

 
Payments (Receipts)
 
(In Millions)
Entergy Arkansas
$156
Entergy Louisiana
($75)
Entergy Mississippi
($33)
Entergy New Orleans
($5)
Entergy Texas
($43)


Entergy Arkansas made its payment in January 2012.  In February 2012, Entergy Arkansas filed for an interim adjustment to its production cost allocation rider requesting that the $156 million be collected from customers over the 22-month period from March 2012 through December 2013.  In March 2012 the APSC issued an order stating that the payment can be recovered from retail customers through the production cost allocation rider, subject to refund.  The LPSC and the APSC requested rehearing of the FERC’s October 2011 order.  

In February 2014 the FERC issued a rehearing order addressing its October 2011 order. The FERC denied the LPSC’s request for rehearing on the issues of whether the bandwidth remedy should be made effective earlier than June 1, 2005, and whether refunds should be ordered for the 20-month refund effective period. The FERC granted the LPSC’s rehearing request on the issue of interest on the bandwidth payments/receipts for the June - December 2005 period, requiring that interest be accrued from June 1, 2006 until the date those bandwidth payments/receipts are made. Also in February 2014 the FERC issued an order rejecting the December 2011 compliance filing that calculated the bandwidth payments/receipts for the June - December 2005 period. The FERC order required a new compliance filing that calculates the bandwidth payments/receipts for the June - December 2005 period based on monthly data for the seven individual months including interest pursuant to the February 2014 rehearing order. Entergy sought rehearing of the February 2014 order with respect to the FERC’s determinations regarding interest. In April 2014 the LPSC filed a petition for review of the FERC’s October 2011 and February 2014 orders with the U.S. Court of Appeals for the D.C. Circuit. In August 2017 the D.C. Circuit issued a decision addressing the LPSC’s appeal of the FERC’s October 2011 and February 2014 orders. On the issue of the FERC’s implementation of the prospective remedy as of June 2005 and whether the bandwidth remedy should be extended for an additional 17 months in years 2004-2005, the D.C. Circuit affirmed the FERC’s implementation of the remedy and denied the LPSC’s appeal. On the issue of whether the operating companies should be required to issue refunds for the 20-month period from September 2001 to May 2003, the D.C. Circuit granted the FERC’s request for agency reconsideration and remanded that issue back to the FERC for further proceedings as requested by all parties to the appeal.

In April and May 2014, Entergy filed with the FERC an updated compliance filing that provides the payments and receipts among the Utility operating companies pursuant to the FERC’s February 2014 orders.  The filing shows the following net payments and receipts, including interest, among the Utility operating companies:
 
Payments (Receipts)
 
(In Millions)
Entergy Arkansas
$68
Entergy Louisiana
($10)
Entergy Mississippi
($11)
Entergy New Orleans
$2
Entergy Texas
($49)

These payments were made in May 2014. The LPSC, City Council, and APSC filed protests.

The hearing on the bandwidth calculation for the seven months June 1, 2005 through December 31, 2005 occurred in July 2016. The presiding judge issued an initial decision in November 2016. In the initial decision, the presiding judge agreed with the Utility operating companies’ position that: (1) interest on the bandwidth payments for the 2005 test period should be accrued from June 1, 2006 until the date that the bandwidth payments for that calculation are paid, which is consistent with how the Utility operating companies performed the calculation; and (2) a portion of Entergy Louisiana’s 2001-vintage Louisiana state net operating loss accumulated deferred income tax that results from the Vidalia tax deduction should be excluded from the 2005 test period bandwidth calculation. Various participants filed briefs on exceptions and/or briefs opposing exceptions related to the initial decision, including the LPSC, the APSC, the FERC trial staff, and Entergy Services. The initial decision is pending before the FERC.

Rough Production Cost Equalization Rates

Each May from 2007 through 2016 Entergy filed with the FERC the rates to implement the FERC’s orders in the System Agreement proceeding.  These filings showed the following payments/receipts among the Utility operating companies were necessary to achieve rough production cost equalization as defined by the FERC’s orders:
 
Payments (Receipts)
 
2007
 
2008
 
2009
 
2010
 
2011
 
2012
 
2013
 
2014
 
(In Millions)
Entergy Arkansas

$252

 

$252

 

$390

 

$41

 

$77

 

$41

 

$—

 

$—

Entergy Louisiana

($211
)
 

($160
)
 

($247
)
 

($22
)
 

($12
)
 

($41
)
 

$—

 

$—

Entergy Mississippi

($41
)
 

($20
)
 

($24
)
 

($19
)
 

($40
)
 

$—

 

$—

 

$—

Entergy New Orleans

$—

 

($7
)
 

$—

 

$—

 

($25
)
 

$—

 

($15
)
 

($15
)
Entergy Texas

($30
)
 

($65
)
 

($119
)
 

$—

 

$—

 

$—

 

$15

 

$15



The Utility operating companies recorded accounts payable or accounts receivable to reflect the rough production cost equalization payments and receipts required to implement the FERC’s remedy.  When accounts payable were recorded, a corresponding regulatory asset was recorded for the right to collect the payments from customers. When accounts receivable were recorded, a corresponding regulatory liability was recorded for the obligations to pass the receipts on to customers.  No payments were required in 2016 or 2015 to implement the FERC’s remedy based on calendar year 2015 production costs and 2014 production costs, respectively. The System Agreement terminated in August 2016.

The APSC approved a production cost allocation rider for recovery from customers of the retail portion of the costs allocated to Entergy Arkansas.  Entergy Texas recovered its 2013 rough production cost equalization payment over three years beginning April 2014. Entergy Texas included its 2014 rough production cost equalization payment as a component of an interim fuel refund made in 2014. Management believes that any changes in the allocation of production costs resulting from the FERC’s decision and related retail proceedings should result in similar rate changes for retail customers, subject to specific circumstances that have caused trapped costs.

The following rough production cost equalization rate proceedings are still ongoing.

2010 Rate Filing Based on Calendar Year 2009 Production Costs

In May 2010, Entergy filed with the FERC the 2010 rates in accordance with the FERC’s orders in the System Agreement proceeding, and supplemented the filing in September 2010.  Several parties intervened in the proceeding at the FERC, including the LPSC and the City Council, which also filed protests.  In July 2010 the FERC accepted Entergy’s proposed rates for filing, effective June 1, 2010, subject to refund.  After an abeyance of the proceeding schedule, a hearing was held in March 2014 and in December 2015 the FERC issued an order. Among other things, the December 2015 order directed Entergy to submit a compliance filing. In January 2016 the LPSC, the APSC, and Entergy filed requests for rehearing of the FERC’s December 2015 order. In February 2016, Entergy submitted the compliance filing ordered in the December 2015 order.  The result of the true-up payments and receipts for the recalculation of production costs resulted in the following payments/receipts among the Utility operating companies:
 
Payments (Receipts)
 
(In Millions)
Entergy Arkansas
$2
Entergy Louisiana
$6
Entergy Mississippi
($4)
Entergy New Orleans
($1)
Entergy Texas
($3)

 
In September 2016 the FERC accepted the February 2016 compliance filing subject to a further compliance filing made in November 2016. The further compliance filing was required as a result of an order issued in September 2016 ruling on the January 2016 rehearing requests filed by the LPSC, the APSC, and Entergy. In the order addressing the rehearing requests, the FERC granted the LPSC’s rehearing request and directed that interest be calculated on the payment/receipt amounts. The FERC also granted the APSC’s and Entergy’s rehearing request and ordered the removal of both securitized asset accumulated deferred income taxes and contra-securitization accumulated deferred income taxes from the calculation. In November 2016, Entergy submitted its compliance filing in response to the FERC’s order on rehearing. The compliance filing included a revised refund calculation of the true-up payments and receipts based on 2009 test year data and interest calculations. The LPSC protested the interest calculations. In November 2017 the FERC issued an order rejecting the November 2016 compliance filing. The FERC determined that the payments detailed in the November 2016 compliance filing did not include adequate interest for the payments from Entergy Arkansas to Entergy Louisiana because it did not include interest on the principal portion of the payment that was made in February 2016. In December 2017, Entergy recalculated the interest pursuant to the November 2017 order. As a result of the recalculations, Entergy Arkansas owed very minor payments to Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans.

2011 Rate Filing Based on Calendar Year 2010 Production Costs

In May 2011, Entergy filed with the FERC the 2011 rates in accordance with the FERC’s orders in the System Agreement proceeding.  Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest.  In July 2011 the FERC accepted Entergy’s proposed rates for filing, effective June 1, 2011, subject to refund. After an abeyance of the proceeding schedule, in December 2014 the FERC consolidated the 2011 rate filing with the 2012, 2013, and 2014 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

2012 Rate Filing Based on Calendar Year 2011 Production Costs

In May 2012, Entergy filed with the FERC the 2012 rates in accordance with the FERC’s orders in the System Agreement proceeding.  Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest.  In August 2012 the FERC accepted Entergy’s proposed rates for filing, effective June 2012, subject to refund. After an abeyance of the proceeding schedule, in December 2014 the FERC consolidated the 2012 rate filing with the 2011, 2013, and 2014 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

2013 Rate Filing Based on Calendar Year 2012 Production Costs

In May 2013, Entergy filed with the FERC the 2013 rates in accordance with the FERC’s orders in the System Agreement proceeding. Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest. The City Council intervened and filed comments related to including the outcome of a related FERC proceeding in the 2013 cost equalization calculation. In August 2013 the FERC issued an order accepting the 2013 rates, effective June 1, 2013, subject to refund. After an abeyance of the proceeding schedule, in December 2014 the FERC consolidated the 2013 rate filing with the 2011, 2012, and 2014 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

2014 Rate Filing Based on Calendar Year 2013 Production Costs

In May 2014, Entergy filed with the FERC the 2014 rates in accordance with the FERC’s orders in the System Agreement proceeding. Several parties intervened in the proceeding at the FERC, including the LPSC, which also filed a protest. The City Council intervened and filed comments. In December 2014 the FERC issued an order accepting the 2014 rates, effective June 1, 2014, subject to refund, set the proceeding for hearing procedures, and consolidated the 2014 rate filing with the 2011, 2012, and 2013 rate filings for settlement and hearing procedures. See discussion below regarding the consolidated settlement and hearing procedures in connection with this proceeding.

Consolidated 2011, 2012, 2013, and 2014 Rate Filing Proceedings

As discussed above, in December 2014 the FERC consolidated the 2011, 2012, 2013, and 2014 rate filings for settlement and hearing procedures. In May 2015, Entergy filed direct testimony in the consolidated rate filings and the LPSC filed direct testimony concerning its complaint proceeding that is consolidated with the rate filings, challenging certain components of the pending bandwidth calculations for prior years. Hearings occurred in November 2015, and the ALJ issued an initial decision in July 2016. In the initial decision, the ALJ generally agreed with Entergy’s bandwidth calculations with one exception on the accounting related to the Waterford 3 sale/leaseback. Briefs were filed in September 2016 and the proceeding is pending.

Utility Operating Company Termination of System Agreement Participation

Entergy Arkansas and Entergy Mississippi ceased participating in the System Agreement effective December 18, 2013 and November 7, 2015, respectively. Entergy Louisiana, Entergy New Orleans, and Entergy Texas terminated participation in the System Agreement on August 31, 2016, which resulted in the termination of the System Agreement in its entirety pursuant to a settlement agreement approved by the FERC in December 2015.

In December 2013 the FERC set one issue for hearing involving whether and how the benefits associated with settlement with Union Pacific regarding certain coal delivery issues should be allocated among Entergy Arkansas and the other Utility operating companies post-termination of the System Agreement. In December 2014 a FERC ALJ issued an initial decision finding that Entergy Arkansas would realize benefits after December 18, 2013 from the 2008 settlement agreement between Entergy Services, Entergy Arkansas, and Union Pacific, related to certain coal delivery issues. The ALJ further found that all of the Utility operating companies should share in those benefits pursuant to a methodology proposed by the MPSC. The Utility operating companies and other parties to the proceeding filed briefs on exceptions and/or briefs opposing exceptions with the FERC challenging various aspects of the December 2014 initial decision. In March 2016 the FERC issued an opinion affirming the December 2014 initial decision with regard to the determination that there were benefits related to the Union Pacific settlement, which were realized post-Entergy Arkansas’s December 2013 withdrawal from the System Agreement, that should be shared with the other Utility operating companies utilizing the methodology proposed by the MPSC and trued-up to actual coal volumes purchased. In May 2016, Entergy made a compliance filing that provided the calculation of Union Pacific settlement benefits utilizing the methodology adopted by the initial decision, trued-up for the actual volumes of coal purchased. The payments were made in May 2016. In August 2016 the FERC issued an order accepting Entergy’s compliance filing. Also in August 2016 the APSC filed a petition for review of the FERC’s March 2016 and August 2016 orders with the U.S. Court of Appeals for the D.C. Circuit. Oral argument before the D.C. Circuit was held on the APSC’s petition in January 2018 and a decision is pending.

In connection with the System Agreement termination settlement agreement, the purchase power agreements, referred to as the jurisdictional separation plan PPAs, between Entergy Texas and Entergy Gulf States Louisiana that were put in place for certain legacy gas units at the time of Entergy Gulf States’s separation into Entergy Texas and Entergy Gulf States Louisiana terminated effective with the System Agreement termination. Similarly, the purchase power agreement between Entergy Gulf States Louisiana and Entergy Texas for the Calcasieu unit also terminated. In March 2016, Entergy Services filed with the FERC the notices of termination. The jurisdictional separation plan PPAs were the means by which Entergy Texas received payment for its receivable associated with Entergy Louisiana’s Spindletop gas storage facility regulatory asset. As a result of the System Agreement termination settlement agreement, effective with the termination date, Entergy Texas no longer receives payments from Entergy Louisiana related to the Spindletop storage facility, which resulted in a write-off recorded in 2015 by Entergy Texas of $23.5 million ($15.3 million net-of-tax). Upon termination of the System Agreement, other purchase power agreements entered into under Service Schedule MSS-4 of the System Agreement were replaced with updated agreements under a FERC-jurisdictional tariff effective September 1, 2016.

Interruptible Load Proceeding

In April 2007 the U.S. Court of Appeals for the D.C. Circuit issued its opinion in the LPSC’s appeal of the FERC’s March 2004 and April 2005 orders related to the treatment under the System Agreement of the Utility operating companies’ interruptible loads.  In its opinion the D.C. Circuit concluded that the FERC: (1) acted arbitrarily and capriciously by allowing the Utility operating companies to phase-in the effects of the elimination of the interruptible load over a 12-month period of time; (2) failed to adequately explain why refunds could not be ordered under Section 206(c) of the Federal Power Act; and (3) exercised appropriately its discretion to defer addressing the cost of sulfur dioxide allowances until a later time.  The D.C. Circuit remanded the matter to the FERC for a more considered determination on the issue of refunds.  The FERC issued its order on remand in September 2007, in which it directed Entergy to make a compliance filing removing all interruptible load from the computation of peak load responsibility commencing April 1, 2004 and to issue any necessary refunds to reflect this change.  In addition, the order directed the Utility operating companies to make refunds for the period May 1995 through July 1996.  In November 2007 the Utility operating companies filed a refund report describing the refunds to be issued pursuant to the FERC’s orders.  The LPSC filed a protest to the refund report in December 2007, and the Utility operating companies filed an answer to the protest in January 2008.  The refunds were made in October 2008 by the Utility operating companies that owed refunds to the Utility operating companies that were due refunds under the decision.  The APSC and the Utility operating companies appealed the FERC decisions to the D.C. Circuit.

Following the filing of petitioners’ initial briefs, the FERC filed a motion requesting the D.C. Circuit hold the appeal of the FERC’s decisions ordering refunds in the interruptible load proceeding in abeyance and remand the record to the FERC.  The D.C. Circuit granted the FERC’s unopposed motion in June 2009.  In December 2009 the FERC established a paper hearing to determine whether the FERC had the authority and, if so, whether it would be appropriate to order refunds resulting from changes in the treatment of interruptible load in the allocation of capacity costs by the Utility operating companies.  In August 2010 the FERC issued an order stating that it has the authority and refunds are appropriate.  The APSC, the MPSC, and Entergy requested rehearing of the FERC’s decision.  In June 2011 the FERC issued an order granting rehearing in part and denying rehearing in part, in which the FERC determined to invoke its discretion to deny refunds.  The FERC held that in this case where “the Entergy system as a whole collected the proper level of revenue, but, as was later established, incorrectly allocated peak load responsibility among the various Entergy operating companies….the Commission will apply here our usual practice in such cases, invoking our equitable discretion to not order refunds, notwithstanding our authority to do so.”  The LPSC has requested rehearing of the FERC’s June 2011 decision.  In July 2011 the refunds made in the fourth quarter 2009 described above were reversed. In October 2011 the FERC issued an “Order Establishing Paper Hearing” inviting parties that oppose refunds to file briefs within 30 days addressing the LPSC’s argument that FERC precedent supports refunds under the circumstances present in this proceeding.  Parties that favor refunds were then invited to file reply briefs within 21 days of the date that the initial briefs were due.  

In September 2010 the FERC had issued an order setting the refund report filed in the proceeding in November 2007 for hearing and settlement judge procedures.  In May 2011, Entergy filed a settlement agreement that resolved all issues relating to the refund report set for hearing.  In June 2011 the settlement judge certified the settlement as uncontested.  The settlement agreement was approved by the FERC in September 2016.

Prior to the FERC’s June 2011 order on rehearing, Entergy Arkansas filed an application in November 2010 with the APSC for recovery of the refund that it paid.  The APSC denied Entergy Arkansas’s application, and also denied Entergy Arkansas’s petition for rehearing.  If the FERC were to order Entergy Arkansas to pay refunds on rehearing in the interruptible load proceeding the APSC’s decision would trap FERC-approved costs at Entergy Arkansas with no regulatory-approved mechanism to recover them.  In August 2011, Entergy Arkansas filed a complaint in the United States District Court for the Eastern District of Arkansas asking for a declaratory judgment that the rejection of Entergy Arkansas’s application by the APSC is preempted by the Federal Power Act.  The APSC filed a motion to dismiss the complaint.  In April 2012 the United States district court dismissed Entergy Arkansas’s complaint without prejudice stating that Entergy Arkansas’s claim is not ripe for adjudication and that Entergy Arkansas did not have standing to bring suit at this time.

In March 2013 the FERC issued an order denying the LPSC’s request for rehearing of the FERC’s June 2011 order wherein the FERC concluded it would exercise its discretion and not order refunds in the interruptible load proceeding. Based on its review of the LPSC’s request for rehearing and the briefs filed as part of the paper hearing established in October 2011, the FERC affirmed its earlier ruling and declined to order refunds under the circumstances of the case. In May 2013 the LPSC filed a petition for review with the U.S. Court of Appeals for the D.C. Circuit seeking review of FERC prior orders in the interruptible load proceeding that concluded that the FERC would exercise its discretion and not order refunds in the proceeding. Oral argument was held on the appeal in the D.C. Circuit in September 2014. In December 2014 the D.C. Circuit issued an order on the LPSC’s appeal and remanded the case back to the FERC. The D.C. Circuit rejected the LPSC’s argument that there is a presumption in favor of refunds, but it held that the FERC had not adequately explained its decision to deny refunds and directed the FERC “to consider the relevant factors and weigh them against one another.” In March 2015, Entergy filed with the FERC a motion to establish a briefing schedule on remand and an initial brief on remand to address the December 2014 decision by the D.C. Circuit. The initial brief on remand argued that the FERC, in response to the D.C. Circuit decision, should clarify its policy on refunds and find that refunds are not required in the interruptible load proceeding.

In April 2016 the FERC issued an order on remand that addressed the December 2014 decision by the D.C. Circuit in the interruptible load proceeding. The order on remand affirmed the FERC’s denial of refunds for the 15-month refund effective period. The FERC explained and clarified its policies regarding refunds and concluded that the evidence in the record demonstrated that the relevant equitable factors favored not requiring refunds in this case. The FERC also noted that, under Section 206(c) of the Federal Power Act, in a Section 206 proceeding involving two or more electric utility companies of a registered holding company system, the FERC may order refunds only if it determines the refunds would not cause the registered holding company to experience any reduction in revenues resulting from an inability of an electric utility company in the system to recover the resulting increase in costs. The FERC stated it was not able to find that the Entergy system would not experience a reduction in revenues if refunds were awarded in this proceeding, which further supported the denial of refunds. In May 2016 the LPSC filed a request for rehearing of the FERC’s April 2016 order. In September 2016 the FERC issued an order denying the LPSC’s request for rehearing and reaffirming its denial of refunds for the 15-month refund effective period. The LPSC has appealed the April and September 2016 orders to the U.S. Court of Appeals for the D.C. Circuit. Oral argument before the D.C. Circuit was held before the D.C. Circuit in February 2018 and a decision is pending.
 
Entergy Arkansas Opportunity Sales Proceeding

In June 2009 the LPSC filed a complaint requesting that the FERC determine that certain of Entergy Arkansas’s sales of electric energy to third parties: (a) violated the provisions of the System Agreement that allocated the energy generated by Entergy System resources; (b) imprudently denied the Entergy System and its ultimate consumers the benefits of low-cost Entergy System generating capacity; and (c) violated the provision of the System Agreement that prohibited sales to third parties by individual companies absent an offer of a right-of-first-refusal to other Utility operating companies.   The LPSC’s complaint challenged sales made beginning in 2002 and requested refunds.  In July 2009 the Utility operating companies filed a response to the complaint requesting that the FERC dismiss the complaint on the merits without hearing because the LPSC has failed to meet its burden of showing any violation of the System Agreement and failed to produce any evidence of imprudent action by the Entergy System.  In their response, the Utility operating companies explained that the System Agreement clearly contemplates that the Utility operating companies may make sales to third parties for their own account, subject to the requirement that those sales be included in the load (or load shape) for the applicable Utility operating company.  The FERC subsequently ordered a hearing in the proceeding.

The LPSC filed direct testimony in the proceeding alleging, among other things, (1) that Entergy violated the System Agreement by permitting Entergy Arkansas to make non-requirements sales to non-affiliated third parties rather than making such energy available to the other Utility operating companies’ customers; and (2) that over the period 2000 - 2009, these non-requirements sales caused harm to the Utility operating companies’ customers and these customers should be compensated for this harm by Entergy.  In subsequent testimony, the LPSC modified its original damages claim in favor of quantifying damages by re-running intra-system bills.  The Utility operating companies believe the LPSC’s allegations are without merit.  A hearing in the matter was held in August 2010.

In December 2010 the ALJ issued an initial decision.  The ALJ found that the System Agreement allowed for Entergy Arkansas to make the sales to third parties but concluded that the sales should be accounted for in the same manner as joint account sales.  The ALJ concluded that “shareholders” should make refunds of the damages to the Utility operating companies, along with interest.  Entergy disagreed with several aspects of the ALJ’s initial decision and in January 2011 filed with the FERC exceptions to the decision.

The FERC issued a decision in June 2012 and held that, while the System Agreement is ambiguous, it does provide authority for individual Utility operating companies to make opportunity sales for their own account and Entergy Arkansas made and priced these sales in good faith.  The FERC found, however, that the System Agreement does not provide authority for an individual Utility operating company to allocate the energy associated with such opportunity sales as part of its load, but provides a different allocation authority.  The FERC further found that the after-the-fact accounting methodology used to allocate the energy used to supply the sales was inconsistent with the System Agreement.  Quantifying the effect of the FERC’s decision requires re-running intra-system bills for a ten-year period, and the FERC in its decision established further hearing procedures to determine the calculation of the effects.  In July 2012, Entergy and the LPSC filed requests for rehearing of the FERC’s June 2012 decision. A hearing was held in May 2013 to quantify the effect of repricing the opportunity sales in accordance with the FERC’s June 2012 decision.

In August 2013 the presiding judge issued an initial decision in the calculation proceeding. The initial decision concluded that the methodology proposed by the LPSC, rather than the methodologies proposed by Entergy or the FERC Staff, should be used to calculate the payments that Entergy Arkansas is to make to the other Utility operating companies. The initial decision also concluded that the other System Agreement service schedules should not be adjusted and that payments by Entergy Arkansas should not be reflected in the rough production cost equalization bandwidth calculations for the applicable years. The initial decision recognized that the LPSC’s methodology would result in an inequitable windfall to the other Utility operating companies and, therefore, concluded that any payments by Entergy Arkansas should be reduced by 20%. The LPSC, the APSC, the City Council, and FERC staff filed briefs on exceptions and/or briefs opposing exceptions. Entergy filed a brief on exceptions requesting that the FERC reverse the initial decision and a brief opposing certain exceptions taken by the LPSC and FERC staff.

In April 2016 the FERC issued orders addressing requests for rehearing filed in July 2012 and the ALJ’s August 2013 initial decision. The first order denied Entergy’s request for rehearing and affirmed the FERC’s earlier rulings that Entergy’s original methodology for allocating energy costs to the opportunity sales was incorrect and, as a result, Entergy Arkansas must make payments to the other Utility operating companies to put them in the same position that they would have been in absent the incorrect allocation. The FERC clarified that interest should be included with the payments. The second order affirmed in part, and reversed in part, the rulings in the ALJ’s August 2013 initial decision regarding the methodology that should be used to calculate the payments Entergy Arkansas is to make to the other Utility operating companies. The FERC affirmed the ALJ’s ruling that a full re-run of intra-system bills should be performed, but required that methodology be modified so that the sales have the same priority for purposes of energy allocation as joint account sales. The FERC reversed the ALJ’s decision that any payments by Entergy Arkansas should be reduced by 20%. The FERC also reversed the ALJ’s decision that adjustments to other System Agreement service schedules and excess bandwidth payments should not be taken into account when calculating the payments to be made by Entergy Arkansas. The FERC held that such adjustments and excess bandwidth payments should be taken into account, but ordered further proceedings before an ALJ to address whether a cap on any reduction due to bandwidth payments was necessary and to implement the other adjustments to the calculation methodology.

In May 2016, Entergy Services filed a request for rehearing of the FERC’s April 2016 order arguing that payments made by Entergy Arkansas should be reduced as a result of the timing of the LPSC’s approval of certain contracts. Entergy Services also filed a request for clarification and/or rehearing of the FERC’s April 2016 order addressing the ALJ’s August 2013 initial decision. The APSC and the LPSC also filed requests for rehearing of the FERC’s April 2016 order. In September 2017 the FERC issued an order denying the request for rehearing on the issue of whether any payments by Entergy Arkansas to the other Utility operating companies should be reduced due to the timing of the LPSC’s approval of Entergy Arkansas’s wholesale baseload contract with Entergy Louisiana. In November 2017 the FERC issued an order denying all of the remaining requests for rehearing of the April 2016 order. In November 2017, Entergy Services filed a petition for review in the D.C. Circuit of the FERC’s orders in the first two phases of the opportunity sales case. In December 2017 the D.C. Circuit granted Entergy Services’s request to hold the appeal in abeyance pending final resolution of the related proceeding still pending with the FERC. In January 2018 the APSC and the LPSC filed separate petitions for review in the D.C. Circuit, and the D.C. Circuit consolidated the appeals with Entergy Services’s appeal and held all of the appeals in abeyance.

Pursuant to the procedural schedule established in the case, Entergy Services re-ran intra-system bills for the ten-year period 2000-2009 to quantify the effects of the FERC's ruling. In November 2016 the LPSC submitted testimony disputing certain aspects of the calculations. A hearing was held in May 2017. In July 2017, the ALJ issued an initial decision concluding that Entergy Arkansas should pay $86 million plus interest to the other Utility operating companies. In August 2017 the Utility operating companies, the LPSC, the APSC, and FERC staff filed individual briefs on exceptions challenging various aspects of the initial decision. In September 2017 the Utility operating companies, the LPSC, the APSC, the MPSC, the City Council, and FERC staff filed separate briefs opposing exceptions taken by various parties. The case is pending before the FERC. No payments will be made or received by the Utility operating companies until the FERC issues an order reviewing the initial decision and Entergy submits a subsequent filing to comply with that order.

The effect of the FERC’s decisions thus far in the case would be that Entergy Arkansas will make payments to some or all of the other Utility operating companies. Because further proceedings will still occur in the case, the amount and recipients of payments by Entergy Arkansas are unknown at this time. Based on testimony previously submitted in the case and its assessment of the April 2016 FERC orders, in the first quarter 2016, Entergy Arkansas recorded a liability of $87 million, which includes interest, for its estimated increased costs and payment to the other Utility operating companies. This estimate is subject to change depending on how the FERC resolves the issues that are still outstanding in the case, including its review of the July 2017 initial decision. Entergy Arkansas’s increased costs will be attributed to Entergy Arkansas’s retail and wholesale businesses, and it is not probable that Entergy Arkansas will recover the wholesale portion. Entergy Arkansas, therefore, recorded a deferred fuel regulatory asset in the first quarter 2016 of approximately $75 million, which represents its estimate of the retail portion of the costs. Following its assessment of the course of the proceedings, including the FERC’s denial of rehearing in November 2017 described above, in the fourth quarter 2017, Entergy Arkansas recorded an additional liability of $35 million and a regulatory asset of $31 million. Because management currently expects to recover the retail portion of the costs through a base rate proceeding or newly proposed rider, the regulatory asset is reflected as Other regulatory assets as of December 31, 2017.
    
Complaint Against System Energy

In January 2017 the APSC and MPSC filed a complaint with the FERC against System Energy. The complaint seeks a reduction in the return on equity component of the Unit Power Sales Agreement pursuant to which System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. Entergy Arkansas also sells some of its Grand Gulf capacity and energy to Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under separate agreements. The current return on equity under the Unit Power Sales Agreement is 10.94%. The complaint alleges that the return on equity is unjust and unreasonable because current capital market and other considerations indicate that it is excessive. The complaint requests the FERC to institute proceedings to investigate the return on equity and establish a lower return on equity, and also requests that the FERC establish January 23, 2017 as a refund effective date. The complaint includes return on equity analysis that purports to establish that the range of reasonable return on equity for System Energy is between 8.37% and 8.67%. System Energy answered the complaint in February 2017 and disputes that a return on equity of 8.37% to 8.67% is just and reasonable. The LPSC and the City Council intervened in the proceeding expressing support for the complaint. System Energy is recording a provision against revenue for the potential outcome of this proceeding. In September 2017 the FERC established a refund effective date of January 23, 2017, consolidated the return on equity complaint with the proceeding described in Unit Power Sales Agreement below, and directed the parties to engage in settlement proceedings before an ALJ. If the parties fail to come to an agreement during settlement proceedings, a prehearing conference will be held to establish a procedural schedule for hearing proceedings.

Unit Power Sales Agreement

In August 2017, System Energy submitted to the FERC proposed amendments to the Unit Power Sales Agreement pursuant to which System Energy sells its Grand Gulf capacity and energy to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. The filing proposes limited amendments to the Unit Power Sales Agreement to adopt (1) updated rates for use in calculating Grand Gulf plant depreciation and amortization expenses and (2) updated nuclear decommissioning cost annual revenue requirements, both of which are recovered through the Unit Power Sales Agreement rate formula. The proposed amendments would result in lower charges to the Utility operating companies that buy capacity and energy from System Energy under the Unit Power Sales Agreement. The proposed changes are based on updated depreciation and nuclear decommissioning studies that take into account the renewal of Grand Gulf’s operating license for a term through November 1, 2044. System Energy requested that the FERC accept the amendments effective October 1, 2017.

In September 2017 the FERC accepted System Energy’s proposed Unit Power Sales Agreement amendments, subject to further proceedings to consider the justness and reasonableness of the amendments. Because the amendments propose a rate decrease, the FERC also initiated an investigation under Section 206 of the Federal Power Act to determine if the rate decrease should be lower than proposed. The FERC accepted the proposed amendments effective October 1, 2017, subject to refund pending the outcome of the further settlement and/or hearing proceedings, and established a refund effective date of October 11, 2017 with respect to the rate decrease. The FERC also consolidated the Unit Power Sales Agreement amendment proceeding with the proceeding described in Complaint Against System Energy above, and directed the parties to engage in settlement proceedings before an ALJ. If the parties fail to come to an agreement during settlement proceedings, a prehearing conference will be held to establish a procedural schedule for hearing proceedings.

Storm Cost Recovery Filings with Retail Regulators

Entergy Louisiana

Hurricane Isaac

In August 2012, Hurricane Isaac caused extensive damage to Entergy Louisiana’s service area.  The storm resulted in widespread power outages, significant damage primarily to distribution infrastructure, and the loss of sales during the power outages.  In June 2014 the LPSC authorized Entergy Louisiana to utilize Louisiana Act 55 financing for Hurricane Isaac system restoration costs.  Entergy Louisiana committed to pass on to customers a minimum of $30.8 million of customer benefits through annual customer credits of approximately $6.2 million for five years. Approvals for the Act 55 financings were obtained from the Louisiana Utilities Restoration Corporation (LURC) and the Louisiana State Bond Commission.

In August 2014 the Louisiana Local Government Environmental Facilities and Community Development Authority (LCDA) issued $314.85 million in bonds under Louisiana Act 55.  From the $309 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $16 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $293 million directly to Entergy Louisiana.  Entergy Louisiana used the $293 million received from the LURC to acquire 2,935,152.69 Class C preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 7.5% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2014, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement. The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1.75 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC, and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

Hurricane Gustav and Hurricane Ike

In September 2008, Hurricane Gustav and Hurricane Ike caused catastrophic damage to Entergy Louisiana’s service territory.  In December 2009, Entergy Louisiana entered into a stipulation agreement with the LPSC staff regarding its storm costs.  In March and April 2010, Entergy Louisiana and other parties to the proceeding filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal to utilize Act 55 financing, which included a commitment to pass on to customers a minimum of $43.3 million of customer benefits through a prospective annual rate reduction of $8.7 million for five years.  In April 2010 the LPSC approved the settlement and subsequently issued financing orders and a ratemaking order intended to facilitate the implementation of the Act 55 financings.  In June 2010 the Louisiana State Bond Commission approved the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricane Gustav and Hurricane Ike was reduced by $2.7 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2010, the LCDA issued two series of bonds totaling $713.0 million under Act 55.  From the $702.7 million of bond proceeds loaned by the LCDA to the LURC, the LURC deposited $290 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $412.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana used $412.7 million to acquire 4,126,940.15 Class B preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 9% annual distribution rate. Distributions are payable quarterly commencing on September 15, 2010, and the membership interests have a liquidation price of $100 per unit. The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.

Entergy and Entergy Louisiana do not report the bonds issued by the LCDA on their balance sheets because the bonds are the obligation of the LCDA, and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC, and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.
Hurricane Katrina and Hurricane Rita

In August and September 2005, Hurricanes Katrina and Rita caused catastrophic damage to Entergy Louisiana’s service territory. In March 2008, Entergy Louisiana and the LURC filed at the LPSC an application requesting that the LPSC grant a financing order authorizing the financing of Entergy Louisiana storm costs, storm reserves, and issuance costs pursuant to Louisiana Act 55.  The Louisiana Act 55 financing is expected to produce additional customer benefits as compared to traditional securitization.  Entergy Louisiana also filed an application requesting LPSC approval for ancillary issues including the mechanism to flow charges and savings to customers via a storm cost offset rider.  In April 2008 the Louisiana Public Facilities Authority (LPFA), which is the issuer of the bonds pursuant to the Act 55 financing, approved requests for the Act 55 financing.  Also in April 2008, Entergy Louisiana and the LPSC staff filed with the LPSC an uncontested stipulated settlement that included Entergy Louisiana’s proposal under the Act 55 financing, which included a commitment to pass on to customers a minimum of $40 million of customer benefits through a prospective annual rate reduction of $8 million for five years.  The LPSC subsequently approved the settlement and issued two financing orders and one ratemaking order intended to facilitate implementation of the Act 55 financing.  In May 2008 the Louisiana State Bond Commission granted final approval of the Act 55 financing. The settlement agreement allowed for an adjustment to the credits if there was a change in the applicable federal or state income tax rate. As a result of the enactment of the Tax Cuts and Jobs Act, in December 2017, and the lowering of the federal corporate income tax rate from 35% to 21%, the Louisiana Act 55 financing savings obligation regulatory liability related to Hurricanes Katrina and Rita was reduced by $22.3 million, with a corresponding increase to Other regulatory credits on the income statement. The effects of the Tax Cuts and Jobs Act are discussed further in Note 3 to the financial statements.

In July 2008 the LPFA issued $687.7 million in bonds under the aforementioned Act 55.  From the $679 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $152 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $527 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $545 million, including $17.8 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 5,449,861.85 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC, a company wholly-owned and consolidated by Entergy, that carry a 10% annual distribution rate.  In August 2008, the LPFA issued $278.4 million in bonds under the aforementioned Act 55.  From the $274.7 million of bond proceeds loaned by the LPFA to the LURC, the LURC deposited $87 million in a restricted escrow account as a storm damage reserve for Entergy Louisiana and transferred $187.7 million directly to Entergy Louisiana.  From the bond proceeds received by Entergy Louisiana from the LURC, Entergy Louisiana invested $189.4 million, including $1.7 million that was withdrawn from the restricted escrow account as approved by the April 16, 2008 LPSC orders, in exchange for 1,893,918.39 Class A preferred, non-voting, membership interest units of Entergy Holdings Company LLC that carry a 10% annual distribution rate.  Distributions are payable quarterly commencing on September 15, 2008 and have a liquidation price of $100 per unit.  The preferred membership interests are callable at the option of Entergy Holdings Company LLC after ten years under the terms of the LLC agreement.  The terms of the membership interests include certain financial covenants to which Entergy Holdings Company LLC is subject, including the requirement to maintain a net worth of at least $1 billion.  In February 2012, Entergy Louisiana sold 500,000 of its Class A preferred membership units in Entergy Holdings Company LLC, a wholly-owned Entergy subsidiary, to a third party in exchange for $51 million plus accrued but unpaid distributions on the units.  The 500,000 preferred membership units are mandatorily redeemable in January 2112.

Entergy and Entergy Louisiana do not report the bonds issued by the LPFA on their balance sheets because the bonds are the obligation of the LPFA, and there is no recourse against Entergy or Entergy Louisiana in the event of a bond default.  To service the bonds, Entergy Louisiana collects a system restoration charge on behalf of the LURC, and remits the collections to the bond indenture trustee.  Entergy and Entergy Louisiana do not report the collections as revenue because Entergy Louisiana is merely acting as the billing and collection agent for the state.

Entergy Mississippi

Entergy Mississippi has approval from the MPSC to collect a storm damage provision of $1.75 million per month. If Entergy Mississippi’s accumulated storm damage provision balance exceeds $15 million, the collection of the storm damage provision ceases until such time that the accumulated storm damage provision becomes less than $10 million. As of April 30, 2016, Entergy Mississippi’s storm damage provision balance was less than $10 million, therefore Entergy Mississippi resumed billing the monthly storm damage provision effective with June 2016 bills. As of September 30, 2016, however, Entergy Mississippi’s storm damage provision balance again exceeded $15 million. Accordingly the storm damage provision was reset to zero beginning with November 2016 bills. As of July 31, 2017, the balance in Entergy Mississippi’s accumulated storm damage provision was again less than $10 million, therefore Entergy Mississippi resumed billing the monthly storm damage provision effective with September 2017 bills.

Entergy New Orleans

In August 2012, Hurricane Isaac caused extensive damage to Entergy New Orleans’s service area. In January 2015 the City Council issued a resolution approving the terms of a joint agreement in principle filed by Entergy New Orleans, Entergy Louisiana, and the City Council Advisors determining, among other things, that Entergy New Orleans’s prudently-incurred storm recovery costs were $49.3 million, of which $31.7 million, net of reimbursements from the storm reserve escrow account, remained recoverable from Entergy New Orleans’s electric customers. The resolution also directed Entergy New Orleans to file an application to securitize the unrecovered City Council-approved storm recovery costs of $31.7 million pursuant to the Louisiana Electric Utility Storm Recovery Securitization Act (Louisiana Act 64). In addition, the resolution found that it was reasonable for Entergy New Orleans to include in the principal amount of its potential securitization the costs to fund and replenish Entergy New Orleans’s storm reserve in an amount that achieved the City Council-approved funding level of $75 million. In January 2015, in compliance with that directive, Entergy New Orleans filed with the City Council an application requesting that the City Council grant a financing order authorizing the financing of Entergy New Orleans’s storm costs, storm reserves, and issuance costs pursuant to Louisiana Act 64. In May 2015 the parties entered into an agreement in principle and the City Council issued a financing order authorizing Entergy New Orleans to issue storm recovery bonds in the aggregate amount of $98.7 million, including $31.8 million for recovery of Entergy New Orleans’s Hurricane Isaac storm recovery costs, including carrying costs, $63.9 million to fund and replenish Entergy New Orleans’s storm reserve, and approximately $3 million for estimated up-front financing costs associated with the securitization. See Note 5 to the financial statements for discussion of the issuance of the securitization bonds in July 2015.

New Nuclear Generation Development Costs

Entergy Louisiana

Entergy Louisiana and Entergy Gulf States Louisiana were developing a project option for new nuclear generation at River Bend.  In March 2010, Entergy Louisiana and Entergy Gulf States Louisiana filed with the LPSC seeking approval to continue the limited development activities necessary to preserve an option to construct a new unit at River Bend.  At its June 2012 meeting the LPSC voted to uphold an ALJ recommendation that the request of Entergy Louisiana and Entergy Gulf States Louisiana be declined on the basis that the LPSC’s rule on new nuclear development does not apply to activities to preserve an option to develop and on the further grounds that the companies improperly engaged in advanced preparation activities prior to certification.  The LPSC directed that Entergy Louisiana and Entergy Gulf States Louisiana be permitted to seek recovery of these costs in their upcoming rate case filings that were subsequently filed in February 2013. In the resolution of the rate case proceeding the LPSC provided for an eight-year amortization of costs incurred in connection with the potential development of new nuclear generation at River Bend, without carrying costs, beginning in December 2014, provided, however, that amortization of these costs shall not result in a future rate increase. As of December 31, 2017, Entergy Louisiana has a regulatory asset of $35.8 million on its balance sheet related to these new nuclear generation development costs.