COMMITMENTS AND CONTINGENCIES  (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory commissions, and governmental agencies in the ordinary course of business.  While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report.  Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

ANO Damage, Outage, and NRC Reviews

See Note 8 to the financial statements in the Form 10-K for a discussion of the ANO stator incident and subsequent NRC reviews.

As discussed in the Form 10-K, in March 2015 the NRC issued a letter notifying Entergy of its decision to move ANO into the “multiple/repetitive degraded cornerstone column” (Column 4) of the NRC’s Reactor Oversight Process Action Matrix. Placement into Column 4 requires significant additional NRC inspection activities at the ANO site, including a review of the site’s root cause evaluation associated with the flood barrier and stator issues, an assessment of the effectiveness of the site’s corrective action program, an additional design basis inspection, a safety culture assessment, and possibly other inspection activities consistent with the NRC’s Inspection Procedure. Entergy Arkansas incurred incremental expenses of approximately $53 million in 2015 to prepare for the NRC inspection that began in early 2016. Excluding remediation and response costs that may result from the additional NRC inspection activities, Entergy Arkansas expects to incur incremental expenses of approximately $50 million in 2016, of which $19.6 million was incurred in the first quarter 2016, in support of NRC inspection activities and to implement Entergy Arkansas’s performance improvement initiatives developed in 2015. A lesser amount of incremental expenses is expected to be ongoing annually after 2016.

Pilgrim NRC Oversight and Planned Shutdown

In September 2015 the NRC placed Pilgrim in its “multiple/repetitive degraded cornerstone column” (Column 4) of its Reactor Oversight Process Action Matrix due to its finding of continuing weaknesses in Pilgrim’s corrective action program that contributed to repeated unscheduled shutdowns and equipment failures. The preliminary estimate of direct costs of Pilgrim’s response to a planned NRC enhanced inspection ranges from $45 million to $60 million in operation and maintenance expense, including approximately $30 million in 2016, of which $5 million was incurred in the first quarter 2016. The estimate does not include potential capital investment or other costs to address issues that may arise in the inspection.

Entergy determined in April 2016 that it intends to refuel Pilgrim in 2017 and then cease operations May 31, 2019. In October 2015, Entergy previously announced its intention to cease operations at Pilgrim because of poor market conditions, reduced revenues, and increased operational costs. Pilgrim currently has approximately 677 MW of Capacity Supply Obligations in ISO New England through May 2019.

Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.
 
Conventional Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation at Entergy Louisiana, Entergy New Orleans, and Entergy Texas.
Entergy Arkansas [Member]  
Commitments And Contingencies
COMMITMENTS AND CONTINGENCIES  (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory commissions, and governmental agencies in the ordinary course of business.  While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report.  Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

ANO Damage, Outage, and NRC Reviews

See Note 8 to the financial statements in the Form 10-K for a discussion of the ANO stator incident and subsequent NRC reviews.

As discussed in the Form 10-K, in March 2015 the NRC issued a letter notifying Entergy of its decision to move ANO into the “multiple/repetitive degraded cornerstone column” (Column 4) of the NRC’s Reactor Oversight Process Action Matrix. Placement into Column 4 requires significant additional NRC inspection activities at the ANO site, including a review of the site’s root cause evaluation associated with the flood barrier and stator issues, an assessment of the effectiveness of the site’s corrective action program, an additional design basis inspection, a safety culture assessment, and possibly other inspection activities consistent with the NRC’s Inspection Procedure. Entergy Arkansas incurred incremental expenses of approximately $53 million in 2015 to prepare for the NRC inspection that began in early 2016. Excluding remediation and response costs that may result from the additional NRC inspection activities, Entergy Arkansas expects to incur incremental expenses of approximately $50 million in 2016, of which $19.6 million was incurred in the first quarter 2016, in support of NRC inspection activities and to implement Entergy Arkansas’s performance improvement initiatives developed in 2015. A lesser amount of incremental expenses is expected to be ongoing annually after 2016.

Pilgrim NRC Oversight and Planned Shutdown

In September 2015 the NRC placed Pilgrim in its “multiple/repetitive degraded cornerstone column” (Column 4) of its Reactor Oversight Process Action Matrix due to its finding of continuing weaknesses in Pilgrim’s corrective action program that contributed to repeated unscheduled shutdowns and equipment failures. The preliminary estimate of direct costs of Pilgrim’s response to a planned NRC enhanced inspection ranges from $45 million to $60 million in operation and maintenance expense, including approximately $30 million in 2016, of which $5 million was incurred in the first quarter 2016. The estimate does not include potential capital investment or other costs to address issues that may arise in the inspection.

Entergy determined in April 2016 that it intends to refuel Pilgrim in 2017 and then cease operations May 31, 2019. In October 2015, Entergy previously announced its intention to cease operations at Pilgrim because of poor market conditions, reduced revenues, and increased operational costs. Pilgrim currently has approximately 677 MW of Capacity Supply Obligations in ISO New England through May 2019.

Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.
 
Conventional Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation at Entergy Louisiana, Entergy New Orleans, and Entergy Texas.
Entergy Louisiana [Member]  
Commitments And Contingencies
COMMITMENTS AND CONTINGENCIES  (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory commissions, and governmental agencies in the ordinary course of business.  While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report.  Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

ANO Damage, Outage, and NRC Reviews

See Note 8 to the financial statements in the Form 10-K for a discussion of the ANO stator incident and subsequent NRC reviews.

As discussed in the Form 10-K, in March 2015 the NRC issued a letter notifying Entergy of its decision to move ANO into the “multiple/repetitive degraded cornerstone column” (Column 4) of the NRC’s Reactor Oversight Process Action Matrix. Placement into Column 4 requires significant additional NRC inspection activities at the ANO site, including a review of the site’s root cause evaluation associated with the flood barrier and stator issues, an assessment of the effectiveness of the site’s corrective action program, an additional design basis inspection, a safety culture assessment, and possibly other inspection activities consistent with the NRC’s Inspection Procedure. Entergy Arkansas incurred incremental expenses of approximately $53 million in 2015 to prepare for the NRC inspection that began in early 2016. Excluding remediation and response costs that may result from the additional NRC inspection activities, Entergy Arkansas expects to incur incremental expenses of approximately $50 million in 2016, of which $19.6 million was incurred in the first quarter 2016, in support of NRC inspection activities and to implement Entergy Arkansas’s performance improvement initiatives developed in 2015. A lesser amount of incremental expenses is expected to be ongoing annually after 2016.

Pilgrim NRC Oversight and Planned Shutdown

In September 2015 the NRC placed Pilgrim in its “multiple/repetitive degraded cornerstone column” (Column 4) of its Reactor Oversight Process Action Matrix due to its finding of continuing weaknesses in Pilgrim’s corrective action program that contributed to repeated unscheduled shutdowns and equipment failures. The preliminary estimate of direct costs of Pilgrim’s response to a planned NRC enhanced inspection ranges from $45 million to $60 million in operation and maintenance expense, including approximately $30 million in 2016, of which $5 million was incurred in the first quarter 2016. The estimate does not include potential capital investment or other costs to address issues that may arise in the inspection.

Entergy determined in April 2016 that it intends to refuel Pilgrim in 2017 and then cease operations May 31, 2019. In October 2015, Entergy previously announced its intention to cease operations at Pilgrim because of poor market conditions, reduced revenues, and increased operational costs. Pilgrim currently has approximately 677 MW of Capacity Supply Obligations in ISO New England through May 2019.

Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.
 
Conventional Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation at Entergy Louisiana, Entergy New Orleans, and Entergy Texas.
Entergy Mississippi [Member]  
Commitments And Contingencies
COMMITMENTS AND CONTINGENCIES  (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory commissions, and governmental agencies in the ordinary course of business.  While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report.  Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

ANO Damage, Outage, and NRC Reviews

See Note 8 to the financial statements in the Form 10-K for a discussion of the ANO stator incident and subsequent NRC reviews.

As discussed in the Form 10-K, in March 2015 the NRC issued a letter notifying Entergy of its decision to move ANO into the “multiple/repetitive degraded cornerstone column” (Column 4) of the NRC’s Reactor Oversight Process Action Matrix. Placement into Column 4 requires significant additional NRC inspection activities at the ANO site, including a review of the site’s root cause evaluation associated with the flood barrier and stator issues, an assessment of the effectiveness of the site’s corrective action program, an additional design basis inspection, a safety culture assessment, and possibly other inspection activities consistent with the NRC’s Inspection Procedure. Entergy Arkansas incurred incremental expenses of approximately $53 million in 2015 to prepare for the NRC inspection that began in early 2016. Excluding remediation and response costs that may result from the additional NRC inspection activities, Entergy Arkansas expects to incur incremental expenses of approximately $50 million in 2016, of which $19.6 million was incurred in the first quarter 2016, in support of NRC inspection activities and to implement Entergy Arkansas’s performance improvement initiatives developed in 2015. A lesser amount of incremental expenses is expected to be ongoing annually after 2016.

Pilgrim NRC Oversight and Planned Shutdown

In September 2015 the NRC placed Pilgrim in its “multiple/repetitive degraded cornerstone column” (Column 4) of its Reactor Oversight Process Action Matrix due to its finding of continuing weaknesses in Pilgrim’s corrective action program that contributed to repeated unscheduled shutdowns and equipment failures. The preliminary estimate of direct costs of Pilgrim’s response to a planned NRC enhanced inspection ranges from $45 million to $60 million in operation and maintenance expense, including approximately $30 million in 2016, of which $5 million was incurred in the first quarter 2016. The estimate does not include potential capital investment or other costs to address issues that may arise in the inspection.

Entergy determined in April 2016 that it intends to refuel Pilgrim in 2017 and then cease operations May 31, 2019. In October 2015, Entergy previously announced its intention to cease operations at Pilgrim because of poor market conditions, reduced revenues, and increased operational costs. Pilgrim currently has approximately 677 MW of Capacity Supply Obligations in ISO New England through May 2019.

Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.
 
Conventional Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation at Entergy Louisiana, Entergy New Orleans, and Entergy Texas.
Entergy New Orleans [Member]  
Commitments And Contingencies
COMMITMENTS AND CONTINGENCIES  (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory commissions, and governmental agencies in the ordinary course of business.  While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report.  Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

ANO Damage, Outage, and NRC Reviews

See Note 8 to the financial statements in the Form 10-K for a discussion of the ANO stator incident and subsequent NRC reviews.

As discussed in the Form 10-K, in March 2015 the NRC issued a letter notifying Entergy of its decision to move ANO into the “multiple/repetitive degraded cornerstone column” (Column 4) of the NRC’s Reactor Oversight Process Action Matrix. Placement into Column 4 requires significant additional NRC inspection activities at the ANO site, including a review of the site’s root cause evaluation associated with the flood barrier and stator issues, an assessment of the effectiveness of the site’s corrective action program, an additional design basis inspection, a safety culture assessment, and possibly other inspection activities consistent with the NRC’s Inspection Procedure. Entergy Arkansas incurred incremental expenses of approximately $53 million in 2015 to prepare for the NRC inspection that began in early 2016. Excluding remediation and response costs that may result from the additional NRC inspection activities, Entergy Arkansas expects to incur incremental expenses of approximately $50 million in 2016, of which $19.6 million was incurred in the first quarter 2016, in support of NRC inspection activities and to implement Entergy Arkansas’s performance improvement initiatives developed in 2015. A lesser amount of incremental expenses is expected to be ongoing annually after 2016.

Pilgrim NRC Oversight and Planned Shutdown

In September 2015 the NRC placed Pilgrim in its “multiple/repetitive degraded cornerstone column” (Column 4) of its Reactor Oversight Process Action Matrix due to its finding of continuing weaknesses in Pilgrim’s corrective action program that contributed to repeated unscheduled shutdowns and equipment failures. The preliminary estimate of direct costs of Pilgrim’s response to a planned NRC enhanced inspection ranges from $45 million to $60 million in operation and maintenance expense, including approximately $30 million in 2016, of which $5 million was incurred in the first quarter 2016. The estimate does not include potential capital investment or other costs to address issues that may arise in the inspection.

Entergy determined in April 2016 that it intends to refuel Pilgrim in 2017 and then cease operations May 31, 2019. In October 2015, Entergy previously announced its intention to cease operations at Pilgrim because of poor market conditions, reduced revenues, and increased operational costs. Pilgrim currently has approximately 677 MW of Capacity Supply Obligations in ISO New England through May 2019.

Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.
 
Conventional Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation at Entergy Louisiana, Entergy New Orleans, and Entergy Texas.
Entergy Texas [Member]  
Commitments And Contingencies
COMMITMENTS AND CONTINGENCIES  (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory commissions, and governmental agencies in the ordinary course of business.  While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report.  Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

ANO Damage, Outage, and NRC Reviews

See Note 8 to the financial statements in the Form 10-K for a discussion of the ANO stator incident and subsequent NRC reviews.

As discussed in the Form 10-K, in March 2015 the NRC issued a letter notifying Entergy of its decision to move ANO into the “multiple/repetitive degraded cornerstone column” (Column 4) of the NRC’s Reactor Oversight Process Action Matrix. Placement into Column 4 requires significant additional NRC inspection activities at the ANO site, including a review of the site’s root cause evaluation associated with the flood barrier and stator issues, an assessment of the effectiveness of the site’s corrective action program, an additional design basis inspection, a safety culture assessment, and possibly other inspection activities consistent with the NRC’s Inspection Procedure. Entergy Arkansas incurred incremental expenses of approximately $53 million in 2015 to prepare for the NRC inspection that began in early 2016. Excluding remediation and response costs that may result from the additional NRC inspection activities, Entergy Arkansas expects to incur incremental expenses of approximately $50 million in 2016, of which $19.6 million was incurred in the first quarter 2016, in support of NRC inspection activities and to implement Entergy Arkansas’s performance improvement initiatives developed in 2015. A lesser amount of incremental expenses is expected to be ongoing annually after 2016.

Pilgrim NRC Oversight and Planned Shutdown

In September 2015 the NRC placed Pilgrim in its “multiple/repetitive degraded cornerstone column” (Column 4) of its Reactor Oversight Process Action Matrix due to its finding of continuing weaknesses in Pilgrim’s corrective action program that contributed to repeated unscheduled shutdowns and equipment failures. The preliminary estimate of direct costs of Pilgrim’s response to a planned NRC enhanced inspection ranges from $45 million to $60 million in operation and maintenance expense, including approximately $30 million in 2016, of which $5 million was incurred in the first quarter 2016. The estimate does not include potential capital investment or other costs to address issues that may arise in the inspection.

Entergy determined in April 2016 that it intends to refuel Pilgrim in 2017 and then cease operations May 31, 2019. In October 2015, Entergy previously announced its intention to cease operations at Pilgrim because of poor market conditions, reduced revenues, and increased operational costs. Pilgrim currently has approximately 677 MW of Capacity Supply Obligations in ISO New England through May 2019.

Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.
 
Conventional Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation at Entergy Louisiana, Entergy New Orleans, and Entergy Texas.
System Energy [Member]  
Commitments And Contingencies
COMMITMENTS AND CONTINGENCIES  (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory commissions, and governmental agencies in the ordinary course of business.  While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report.  Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

ANO Damage, Outage, and NRC Reviews

See Note 8 to the financial statements in the Form 10-K for a discussion of the ANO stator incident and subsequent NRC reviews.

As discussed in the Form 10-K, in March 2015 the NRC issued a letter notifying Entergy of its decision to move ANO into the “multiple/repetitive degraded cornerstone column” (Column 4) of the NRC’s Reactor Oversight Process Action Matrix. Placement into Column 4 requires significant additional NRC inspection activities at the ANO site, including a review of the site’s root cause evaluation associated with the flood barrier and stator issues, an assessment of the effectiveness of the site’s corrective action program, an additional design basis inspection, a safety culture assessment, and possibly other inspection activities consistent with the NRC’s Inspection Procedure. Entergy Arkansas incurred incremental expenses of approximately $53 million in 2015 to prepare for the NRC inspection that began in early 2016. Excluding remediation and response costs that may result from the additional NRC inspection activities, Entergy Arkansas expects to incur incremental expenses of approximately $50 million in 2016, of which $19.6 million was incurred in the first quarter 2016, in support of NRC inspection activities and to implement Entergy Arkansas’s performance improvement initiatives developed in 2015. A lesser amount of incremental expenses is expected to be ongoing annually after 2016.

Pilgrim NRC Oversight and Planned Shutdown

In September 2015 the NRC placed Pilgrim in its “multiple/repetitive degraded cornerstone column” (Column 4) of its Reactor Oversight Process Action Matrix due to its finding of continuing weaknesses in Pilgrim’s corrective action program that contributed to repeated unscheduled shutdowns and equipment failures. The preliminary estimate of direct costs of Pilgrim’s response to a planned NRC enhanced inspection ranges from $45 million to $60 million in operation and maintenance expense, including approximately $30 million in 2016, of which $5 million was incurred in the first quarter 2016. The estimate does not include potential capital investment or other costs to address issues that may arise in the inspection.

Entergy determined in April 2016 that it intends to refuel Pilgrim in 2017 and then cease operations May 31, 2019. In October 2015, Entergy previously announced its intention to cease operations at Pilgrim because of poor market conditions, reduced revenues, and increased operational costs. Pilgrim currently has approximately 677 MW of Capacity Supply Obligations in ISO New England through May 2019.

Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.
 
Conventional Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation at Entergy Louisiana, Entergy New Orleans, and Entergy Texas.