Asset Retirement Obligations
12 Months Ended
Dec. 31, 2015
Asset Retirement Obligations
Accounting standards require companies to record liabilities for all legal obligations associated with the retirement of long-lived assets that result from the normal operation of the assets.  For Entergy, substantially all of its asset retirement obligations consist of its liability for decommissioning its nuclear power plants.  In addition, an insignificant amount of removal costs associated with non-nuclear power plants is also included in the decommissioning line item on the balance sheets.
 
These liabilities are recorded at their fair values (which are the present values of the estimated future cash outflows) in the period in which they are incurred, with an accompanying addition to the recorded cost of the long-lived asset.  The asset retirement obligation is accreted each year through a charge to expense, to reflect the time value of money for this present value obligation.  The accretion will continue through the completion of the asset retirement activity.  The amounts added to the carrying amounts of the long-lived assets will be depreciated over the useful lives of the assets.  The application of accounting standards related to asset retirement obligations is earnings neutral to the rate-regulated business of the Registrant Subsidiaries.

In accordance with ratemaking treatment and as required by regulatory accounting standards, the depreciation provisions for the Registrant Subsidiaries include a component for removal costs that are not asset retirement obligations under accounting standards.  In accordance with regulatory accounting principles, the Registrant Subsidiaries have recorded regulatory assets (liabilities) in the following amounts to reflect their estimates of the difference between estimated incurred removal costs and estimated removal costs recovered in rates:
 
December 31,
 
2015
 
2014
 
(In Millions)
Entergy Arkansas
$85.7
 
$59.0
Entergy Louisiana
($68.3)
 
($82.6)
Entergy Mississippi
$77.5
 
$76.3
Entergy New Orleans
$29.4
 
$35.2
Entergy Texas
$25.8
 
$18.9
System Energy
$54.8
 
$55.7


The cumulative decommissioning and retirement cost liabilities and expenses recorded in 2015 by Entergy were as follows:
 
Liabilities as
of December 31,
2014
 
Liabilities Incurred (a)
 
 
 
Accretion
 
Change in
Cash Flow
Estimate
 
 
 
Spending
 
Liabilities as of December 31, 2015
 
(In Millions)
Utility:
 
 
 
 
 
 
 
 
 
 
 
Entergy Arkansas
$818.4
 

$3.5

 

$50.4

 

$—

 

$—

 

$872.3

Entergy Louisiana
$950.3
 

$1.9

 

$51.0

 

$24.7

 

$—

 

$1,027.9

Entergy Mississippi
$6.8
 

$1.1

 

$0.4

 

$—

 

$—

 

$8.3

Entergy New Orleans
$2.5
 

$—

 

$0.2

 

$—

 

$—

 

$2.7

Entergy Texas
$4.6
 

$1.4

 

$0.3

 

($0.2
)
 

$—

 

$6.1

System Energy
$757.9
 

$—

 

$48.0

 

($2.5
)
 

$—

 

$803.4

Entergy Wholesale Commodities
$1,917.8
 

$—

 

$153.8

 

$99.6

 

($101.7
)
 

$2,069.5


(a)
See “Coal Combustion Residuals” below for additional discussion regarding the asset retirement obligations related to coal combustion residuals management.
The cumulative decommissioning and retirement cost liabilities and expenses recorded in 2014 by Entergy were as follows:
 
Liabilities as
of December 31,
2013
 
 
 
Accretion
 
Change in
Cash Flow
Estimate
 
 
 
Spending
 
Liabilities as
 of December 31,
2014
 
(In Millions)
Utility:
 
 
 
 
 
 
 
 
 
Entergy Arkansas

$723.8

 

$47.0

 

$47.6

 

$—

 

$818.4

Entergy Louisiana

$882.2

 

$48.1

 

$20.0

 

$—

 

$950.3

Entergy Mississippi

$6.4

 

$0.4

 

$—

 

$—

 

$6.8

Entergy New Orleans

$2.3

 

$0.2

 

$—

 

$—

 

$2.5

Entergy Texas

$4.3

 

$0.3

 

$—

 

$—

 

$4.6

System Energy

$616.2

 

$41.8

 

$99.9

 

$—

 

$757.9

Entergy Wholesale Commodities

$1,698.2

 

$139.7

 

$101.6

 

($21.7
)
 

$1,917.8



Nuclear Plant Decommissioning

Entergy periodically reviews and updates estimated decommissioning costs.  The actual decommissioning costs may vary from the estimates because of regulatory requirements, changes in technology, and increased costs of labor, materials, and equipment.  As described below, during 2015 and 2014 Entergy updated decommissioning cost estimates for certain nuclear power plants.

In the second quarter 2015, Entergy Wholesale Commodities recorded a revision to its estimated decommissioning cost liability for a nuclear site as a result of a revised decommissioning cost study. The revised estimate resulted in a $77.6 million reduction in the decommissioning cost liability, along with a corresponding reduction in the related asset retirement cost asset.

In the third quarter 2015, Entergy Wholesale Commodities recorded a revision to its estimated decommissioning cost liability for Pilgrim as a result of a revised decommissioning cost study. The revised estimate resulted in a $134 million increase in the decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset. The increase in the estimated decommissioning cost liability resulted from the change in expectation regarding the timing of decommissioning cash flows due to the decision to cease operations of the plant no later than June 2019. The asset retirement cost asset was included in the Pilgrim carrying value that was written down to fair value in the third quarter 2015. See Note 1 to the financial statements for discussion of the impairment of the value and planned shutdown of the Pilgrim plant.

After shutdown, Pilgrim will transition to decommissioning. The Pilgrim nuclear decommissioning trust had a balance of approximately $896 million as of December 31, 2015, representing excess financial assurance of approximately $270 million for license termination activities above NRC-required assurance levels. Filings with the NRC for planned shutdown activities will determine whether any other financial assurance may be required and will specifically address funding for spent fuel management, which will be required until the federal government takes possession of the fuel and removes it from the site, per its current obligation. No additional funding is anticipated at this time.

In the fourth quarter 2015, Entergy Louisiana recorded a revision to its estimated decommissioning cost liability for Waterford 3 as a result of a revised decommissioning cost study.  The revised estimate resulted in a $24.9 million increase in its decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset that will be depreciated over the remaining life of the unit.

In the fourth quarter 2015, System Energy recorded a revision to its estimated decommissioning cost liability for Grand Gulf as a result of a revised decommissioning cost study.  The revised estimate resulted in a $2.5 million reduction in its decommissioning cost liability, along with a corresponding reduction in the related asset retirement cost asset that will be depreciated over the remaining life of the unit.

In the fourth quarter 2015, Entergy Wholesale Commodities recorded a revision to its estimated decommissioning cost liability for Palisades as a result of a revised decommissioning cost study. The revised estimate resulted in a $42.4 million increase in the decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset. The asset retirement cost asset was included in the Palisades carrying value that was written down to fair value in the fourth quarter 2015. See Note 1 to the financial statements for discussion of the impairment of the value of the Palisades plant.

In 2013, Entergy Wholesale Commodities recorded two revisions to its estimated decommissioning cost liability for Vermont Yankee. In the third quarter 2013, the estimated decommissioning cost liability increased by $58 million, along with a corresponding increase in the related asset retirement cost asset. The increase in the estimated decommissioning cost liability resulted from the change in expectation regarding the timing of decommissioning cash flows due to the decision to cease operations of the plant. The asset retirement cost asset was included in the carrying value used to write down Vermont Yankee and related assets to their fair values in the third quarter 2013. As a result of the settlement agreement regarding the remaining operation and decommissioning of Vermont Yankee, Entergy reassessed its assumptions regarding the timing of decommissioning cash flows. The reassessment resulted in a $27.2 million increase in the decommissioning cost liability and a corresponding impairment charge, recorded in fourth quarter 2013.

In accordance with the settlement agreement, Entergy Vermont Yankee provided to the Vermont parties, in 2014, a site assessment study of the costs and tasks of radiological decommissioning, spent nuclear fuel management, and site restoration for Vermont Yankee.  Entergy Vermont Yankee filed its Post-Shutdown Decommissioning Activities Report (PSDAR) for Vermont Yankee with the NRC in December 2014.  As part of the development of the site assessment study and PSDAR, Entergy obtained a revised decommissioning cost study in the third quarter 2014. The revised estimate, along with reassessment of the assumptions regarding the timing of decommissioning cash flows, resulted in a $101.6 million increase in the decommissioning cost liability and a corresponding impairment charge, recorded in September 2014.

Vermont Yankee submitted notification of permanent cessation of operations and permanent removal of fuel from the reactor in January 2015 after final shutdown in December 2014. Vermont Yankee’s future certifications to satisfy the NRC’s financial assurance requirements will now be based on the site specific cost estimate, including the estimated cost of managing spent fuel, rather than the NRC minimum formula for estimating decommissioning costs. Filings with the NRC for planned shutdown activities will determine whether any other financial assurance may be required and will specifically address funding for spent fuel management, which will be required until the federal government takes possession of the fuel and removes it from the site, per its current obligation.

Entergy expects that amounts available in Vermont Yankee’s decommissioning trust fund, including expected earnings, together with the credit facilities entered into in January 2015 that are expected to be repaid with recoveries from DOE litigation related to spent fuel storage, will be sufficient to cover Vermont Yankee’s expected costs of decommissioning, spent fuel management costs, and site restoration.  In June 2015 the NRC issued an exemption from its regulations to allow Vermont Yankee to use its decommissioning trust fund to pay for approximately $225 million of estimated future spent fuel management costs that will not be paid for using funds from the credit facilities.  In August 2015, Vermont and two Vermont utilities filed a petition in the U.S. Court of Appeals for the D.C. Circuit challenging the NRC’s issuance of that exemption.  If the appeal were to result in a final decision denying Vermont Yankee the exemption allowing the use of its decommissioning trust fund to pay for these spent fuel management costs, Vermont Yankee would have to satisfy the NRC that it had a plan to obtain additional funds to enable it to pay for these costs until the federal government takes possession of the fuel and removes it from the site. See Note 1 to the financial statements for further discussion regarding the Vermont Yankee plant.
In 2014, Entergy Arkansas recorded a revision to its estimated decommissioning cost liabilities for ANO 1 and ANO 2 as a result of a revised decommissioning cost study.  The revised estimates resulted in a $47.6 million increase in the decommissioning cost liabilities, along with a corresponding increase in the related asset retirement cost assets that will be depreciated over the remaining lives of the units.

In the fourth quarter 2014, Entergy Louisiana recorded a revision to its estimated decommissioning cost liability for River Bend as a result of a revised decommissioning cost study. The revised estimate resulted in a $20 million increase in the decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset that will be depreciated over the remaining useful life of the unit.

In the fourth quarter 2014, System Energy recorded a revision to its estimated decommissioning cost liability for Grand Gulf as a result of a revised decommissioning cost study.  The revised estimate resulted in a $99.9 million increase in its decommissioning liability, along with a corresponding increase in the related asset retirement cost asset that will be depreciated over the remaining life of the unit.

For the Indian Point 3 and FitzPatrick plants purchased in 2000, NYPA retained the decommissioning trusts and the decommissioning liabilities.  NYPA and Entergy subsidiaries executed decommissioning agreements, which specify their decommissioning obligations.  NYPA has the right to require the Entergy subsidiaries to assume each of the decommissioning liabilities provided that it assigns the corresponding decommissioning trust, up to a specified level, to the Entergy subsidiaries.  If the decommissioning liabilities are retained by NYPA, the Entergy subsidiaries will perform the decommissioning of the plants at a price equal to the lesser of a pre-specified level or the amount in the decommissioning trusts.  The contract asset represents an estimate of the present value of the difference between the stipulated contract amount for decommissioning the plants less the decommissioning costs estimated in independent decommissioning cost studies. The asset is increased by monthly accretion based on the applicable discount rate necessary to ultimately provide for the estimated future value of the decommissioning contract.  The monthly accretion is recorded as interest income.

In the third quarter 2015, Entergy Wholesale Commodities recorded a revision to the contract asset for the FitzPatrick plant. Due to a change in expectation regarding the timing of decommissioning cash flows, the result was a write down of the contract asset from $335 million to $131 million, for a charge of $204 million. See Note 1 to the financial statements for further discussion of the impairment of the value and planned shutdown of the FitzPatrick plant.

As of December 31, 2015 the contract asset for the Indian Point 3 and FitzPatrick plants is $420.8 million.

Entergy maintains decommissioning trust funds that are committed to meeting its obligations for the costs of decommissioning the nuclear power plants.  The fair values of the decommissioning trust funds and the related asset retirement obligation regulatory assets (liabilities) of Entergy as of December 31, 2015 are as follows:
 
Decommissioning
Trust Fair Values
 
Regulatory
Asset (Liability)
 
(In Millions)
Utility:
 
 
 
ANO 1 and ANO 2

$771.3

 

$280.3

River Bend

$651.7

 

($26.8
)
Waterford 3

$390.6

 

$158.5

Grand Gulf

$701.5

 

$108.6

Entergy Wholesale Commodities

$2,834.9

 

$—


The fair values of the decommissioning trust funds and the related asset retirement obligation regulatory assets (liabilities) of Entergy as of December 31, 2014 are as follows:
 
Decommissioning
Trust Fair Values
 
Regulatory
Asset (Liability)
 
(In Millions)
Utility:
 
 
 
ANO 1 and ANO 2

$769.9

 

$247.6

River Bend

$637.7

 

($25.5
)
Waterford 3

$383.6

 

$145.5

Grand Gulf

$679.8

 

$80.4

Entergy Wholesale Commodities

$2,899.9

 

$—


Coal Combustion Residuals

In June 2010 the EPA issued a proposed rule on coal combustion residuals (CCRs) that contained two primary regulatory options: (1) regulating CCRs destined for disposal in landfills or received (including stored) in surface impoundments as so-called “special wastes” under the hazardous waste program of RCRA Subtitle C; or (2) regulating CCRs destined for disposal in landfills or surface impoundments as non-hazardous wastes under Subtitle D of RCRA.  Under both options, CCRs that are beneficially reused in certain processes would remain excluded from hazardous waste regulation. In April 2015 the EPA published the final CCR rule with the material being regulated under the second scenario presented above - as non-hazardous wastes regulated under RCRA Subtitle D. The final regulations create new compliance requirements including modified storage, new notification and reporting practices, product disposal considerations, and CCR unit closure criteria.  Entergy believes that on-site disposal options will be available at its facilities, to the extent needed for CCR that cannot be transferred for beneficial reuse.
Entergy Arkansas [Member]  
Asset Retirement Obligations
Accounting standards require companies to record liabilities for all legal obligations associated with the retirement of long-lived assets that result from the normal operation of the assets.  For Entergy, substantially all of its asset retirement obligations consist of its liability for decommissioning its nuclear power plants.  In addition, an insignificant amount of removal costs associated with non-nuclear power plants is also included in the decommissioning line item on the balance sheets.
 
These liabilities are recorded at their fair values (which are the present values of the estimated future cash outflows) in the period in which they are incurred, with an accompanying addition to the recorded cost of the long-lived asset.  The asset retirement obligation is accreted each year through a charge to expense, to reflect the time value of money for this present value obligation.  The accretion will continue through the completion of the asset retirement activity.  The amounts added to the carrying amounts of the long-lived assets will be depreciated over the useful lives of the assets.  The application of accounting standards related to asset retirement obligations is earnings neutral to the rate-regulated business of the Registrant Subsidiaries.

In accordance with ratemaking treatment and as required by regulatory accounting standards, the depreciation provisions for the Registrant Subsidiaries include a component for removal costs that are not asset retirement obligations under accounting standards.  In accordance with regulatory accounting principles, the Registrant Subsidiaries have recorded regulatory assets (liabilities) in the following amounts to reflect their estimates of the difference between estimated incurred removal costs and estimated removal costs recovered in rates:
 
December 31,
 
2015
 
2014
 
(In Millions)
Entergy Arkansas
$85.7
 
$59.0
Entergy Louisiana
($68.3)
 
($82.6)
Entergy Mississippi
$77.5
 
$76.3
Entergy New Orleans
$29.4
 
$35.2
Entergy Texas
$25.8
 
$18.9
System Energy
$54.8
 
$55.7


The cumulative decommissioning and retirement cost liabilities and expenses recorded in 2015 by Entergy were as follows:
 
Liabilities as
of December 31,
2014
 
Liabilities Incurred (a)
 
 
 
Accretion
 
Change in
Cash Flow
Estimate
 
 
 
Spending
 
Liabilities as of December 31, 2015
 
(In Millions)
Utility:
 
 
 
 
 
 
 
 
 
 
 
Entergy Arkansas
$818.4
 

$3.5

 

$50.4

 

$—

 

$—

 

$872.3

Entergy Louisiana
$950.3
 

$1.9

 

$51.0

 

$24.7

 

$—

 

$1,027.9

Entergy Mississippi
$6.8
 

$1.1

 

$0.4

 

$—

 

$—

 

$8.3

Entergy New Orleans
$2.5
 

$—

 

$0.2

 

$—

 

$—

 

$2.7

Entergy Texas
$4.6
 

$1.4

 

$0.3

 

($0.2
)
 

$—

 

$6.1

System Energy
$757.9
 

$—

 

$48.0

 

($2.5
)
 

$—

 

$803.4

Entergy Wholesale Commodities
$1,917.8
 

$—

 

$153.8

 

$99.6

 

($101.7
)
 

$2,069.5


(a)
See “Coal Combustion Residuals” below for additional discussion regarding the asset retirement obligations related to coal combustion residuals management.
The cumulative decommissioning and retirement cost liabilities and expenses recorded in 2014 by Entergy were as follows:
 
Liabilities as
of December 31,
2013
 
 
 
Accretion
 
Change in
Cash Flow
Estimate
 
 
 
Spending
 
Liabilities as
 of December 31,
2014
 
(In Millions)
Utility:
 
 
 
 
 
 
 
 
 
Entergy Arkansas

$723.8

 

$47.0

 

$47.6

 

$—

 

$818.4

Entergy Louisiana

$882.2

 

$48.1

 

$20.0

 

$—

 

$950.3

Entergy Mississippi

$6.4

 

$0.4

 

$—

 

$—

 

$6.8

Entergy New Orleans

$2.3

 

$0.2

 

$—

 

$—

 

$2.5

Entergy Texas

$4.3

 

$0.3

 

$—

 

$—

 

$4.6

System Energy

$616.2

 

$41.8

 

$99.9

 

$—

 

$757.9

Entergy Wholesale Commodities

$1,698.2

 

$139.7

 

$101.6

 

($21.7
)
 

$1,917.8



Nuclear Plant Decommissioning

Entergy periodically reviews and updates estimated decommissioning costs.  The actual decommissioning costs may vary from the estimates because of regulatory requirements, changes in technology, and increased costs of labor, materials, and equipment.  As described below, during 2015 and 2014 Entergy updated decommissioning cost estimates for certain nuclear power plants.

In the second quarter 2015, Entergy Wholesale Commodities recorded a revision to its estimated decommissioning cost liability for a nuclear site as a result of a revised decommissioning cost study. The revised estimate resulted in a $77.6 million reduction in the decommissioning cost liability, along with a corresponding reduction in the related asset retirement cost asset.

In the third quarter 2015, Entergy Wholesale Commodities recorded a revision to its estimated decommissioning cost liability for Pilgrim as a result of a revised decommissioning cost study. The revised estimate resulted in a $134 million increase in the decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset. The increase in the estimated decommissioning cost liability resulted from the change in expectation regarding the timing of decommissioning cash flows due to the decision to cease operations of the plant no later than June 2019. The asset retirement cost asset was included in the Pilgrim carrying value that was written down to fair value in the third quarter 2015. See Note 1 to the financial statements for discussion of the impairment of the value and planned shutdown of the Pilgrim plant.

After shutdown, Pilgrim will transition to decommissioning. The Pilgrim nuclear decommissioning trust had a balance of approximately $896 million as of December 31, 2015, representing excess financial assurance of approximately $270 million for license termination activities above NRC-required assurance levels. Filings with the NRC for planned shutdown activities will determine whether any other financial assurance may be required and will specifically address funding for spent fuel management, which will be required until the federal government takes possession of the fuel and removes it from the site, per its current obligation. No additional funding is anticipated at this time.

In the fourth quarter 2015, Entergy Louisiana recorded a revision to its estimated decommissioning cost liability for Waterford 3 as a result of a revised decommissioning cost study.  The revised estimate resulted in a $24.9 million increase in its decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset that will be depreciated over the remaining life of the unit.

In the fourth quarter 2015, System Energy recorded a revision to its estimated decommissioning cost liability for Grand Gulf as a result of a revised decommissioning cost study.  The revised estimate resulted in a $2.5 million reduction in its decommissioning cost liability, along with a corresponding reduction in the related asset retirement cost asset that will be depreciated over the remaining life of the unit.

In the fourth quarter 2015, Entergy Wholesale Commodities recorded a revision to its estimated decommissioning cost liability for Palisades as a result of a revised decommissioning cost study. The revised estimate resulted in a $42.4 million increase in the decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset. The asset retirement cost asset was included in the Palisades carrying value that was written down to fair value in the fourth quarter 2015. See Note 1 to the financial statements for discussion of the impairment of the value of the Palisades plant.

In 2013, Entergy Wholesale Commodities recorded two revisions to its estimated decommissioning cost liability for Vermont Yankee. In the third quarter 2013, the estimated decommissioning cost liability increased by $58 million, along with a corresponding increase in the related asset retirement cost asset. The increase in the estimated decommissioning cost liability resulted from the change in expectation regarding the timing of decommissioning cash flows due to the decision to cease operations of the plant. The asset retirement cost asset was included in the carrying value used to write down Vermont Yankee and related assets to their fair values in the third quarter 2013. As a result of the settlement agreement regarding the remaining operation and decommissioning of Vermont Yankee, Entergy reassessed its assumptions regarding the timing of decommissioning cash flows. The reassessment resulted in a $27.2 million increase in the decommissioning cost liability and a corresponding impairment charge, recorded in fourth quarter 2013.

In accordance with the settlement agreement, Entergy Vermont Yankee provided to the Vermont parties, in 2014, a site assessment study of the costs and tasks of radiological decommissioning, spent nuclear fuel management, and site restoration for Vermont Yankee.  Entergy Vermont Yankee filed its Post-Shutdown Decommissioning Activities Report (PSDAR) for Vermont Yankee with the NRC in December 2014.  As part of the development of the site assessment study and PSDAR, Entergy obtained a revised decommissioning cost study in the third quarter 2014. The revised estimate, along with reassessment of the assumptions regarding the timing of decommissioning cash flows, resulted in a $101.6 million increase in the decommissioning cost liability and a corresponding impairment charge, recorded in September 2014.

Vermont Yankee submitted notification of permanent cessation of operations and permanent removal of fuel from the reactor in January 2015 after final shutdown in December 2014. Vermont Yankee’s future certifications to satisfy the NRC’s financial assurance requirements will now be based on the site specific cost estimate, including the estimated cost of managing spent fuel, rather than the NRC minimum formula for estimating decommissioning costs. Filings with the NRC for planned shutdown activities will determine whether any other financial assurance may be required and will specifically address funding for spent fuel management, which will be required until the federal government takes possession of the fuel and removes it from the site, per its current obligation.

Entergy expects that amounts available in Vermont Yankee’s decommissioning trust fund, including expected earnings, together with the credit facilities entered into in January 2015 that are expected to be repaid with recoveries from DOE litigation related to spent fuel storage, will be sufficient to cover Vermont Yankee’s expected costs of decommissioning, spent fuel management costs, and site restoration.  In June 2015 the NRC issued an exemption from its regulations to allow Vermont Yankee to use its decommissioning trust fund to pay for approximately $225 million of estimated future spent fuel management costs that will not be paid for using funds from the credit facilities.  In August 2015, Vermont and two Vermont utilities filed a petition in the U.S. Court of Appeals for the D.C. Circuit challenging the NRC’s issuance of that exemption.  If the appeal were to result in a final decision denying Vermont Yankee the exemption allowing the use of its decommissioning trust fund to pay for these spent fuel management costs, Vermont Yankee would have to satisfy the NRC that it had a plan to obtain additional funds to enable it to pay for these costs until the federal government takes possession of the fuel and removes it from the site. See Note 1 to the financial statements for further discussion regarding the Vermont Yankee plant.
In 2014, Entergy Arkansas recorded a revision to its estimated decommissioning cost liabilities for ANO 1 and ANO 2 as a result of a revised decommissioning cost study.  The revised estimates resulted in a $47.6 million increase in the decommissioning cost liabilities, along with a corresponding increase in the related asset retirement cost assets that will be depreciated over the remaining lives of the units.

In the fourth quarter 2014, Entergy Louisiana recorded a revision to its estimated decommissioning cost liability for River Bend as a result of a revised decommissioning cost study. The revised estimate resulted in a $20 million increase in the decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset that will be depreciated over the remaining useful life of the unit.

In the fourth quarter 2014, System Energy recorded a revision to its estimated decommissioning cost liability for Grand Gulf as a result of a revised decommissioning cost study.  The revised estimate resulted in a $99.9 million increase in its decommissioning liability, along with a corresponding increase in the related asset retirement cost asset that will be depreciated over the remaining life of the unit.

For the Indian Point 3 and FitzPatrick plants purchased in 2000, NYPA retained the decommissioning trusts and the decommissioning liabilities.  NYPA and Entergy subsidiaries executed decommissioning agreements, which specify their decommissioning obligations.  NYPA has the right to require the Entergy subsidiaries to assume each of the decommissioning liabilities provided that it assigns the corresponding decommissioning trust, up to a specified level, to the Entergy subsidiaries.  If the decommissioning liabilities are retained by NYPA, the Entergy subsidiaries will perform the decommissioning of the plants at a price equal to the lesser of a pre-specified level or the amount in the decommissioning trusts.  The contract asset represents an estimate of the present value of the difference between the stipulated contract amount for decommissioning the plants less the decommissioning costs estimated in independent decommissioning cost studies. The asset is increased by monthly accretion based on the applicable discount rate necessary to ultimately provide for the estimated future value of the decommissioning contract.  The monthly accretion is recorded as interest income.

In the third quarter 2015, Entergy Wholesale Commodities recorded a revision to the contract asset for the FitzPatrick plant. Due to a change in expectation regarding the timing of decommissioning cash flows, the result was a write down of the contract asset from $335 million to $131 million, for a charge of $204 million. See Note 1 to the financial statements for further discussion of the impairment of the value and planned shutdown of the FitzPatrick plant.

As of December 31, 2015 the contract asset for the Indian Point 3 and FitzPatrick plants is $420.8 million.

Entergy maintains decommissioning trust funds that are committed to meeting its obligations for the costs of decommissioning the nuclear power plants.  The fair values of the decommissioning trust funds and the related asset retirement obligation regulatory assets (liabilities) of Entergy as of December 31, 2015 are as follows:
 
Decommissioning
Trust Fair Values
 
Regulatory
Asset (Liability)
 
(In Millions)
Utility:
 
 
 
ANO 1 and ANO 2

$771.3

 

$280.3

River Bend

$651.7

 

($26.8
)
Waterford 3

$390.6

 

$158.5

Grand Gulf

$701.5

 

$108.6

Entergy Wholesale Commodities

$2,834.9

 

$—


The fair values of the decommissioning trust funds and the related asset retirement obligation regulatory assets (liabilities) of Entergy as of December 31, 2014 are as follows:
 
Decommissioning
Trust Fair Values
 
Regulatory
Asset (Liability)
 
(In Millions)
Utility:
 
 
 
ANO 1 and ANO 2

$769.9

 

$247.6

River Bend

$637.7

 

($25.5
)
Waterford 3

$383.6

 

$145.5

Grand Gulf

$679.8

 

$80.4

Entergy Wholesale Commodities

$2,899.9

 

$—


Coal Combustion Residuals

In June 2010 the EPA issued a proposed rule on coal combustion residuals (CCRs) that contained two primary regulatory options: (1) regulating CCRs destined for disposal in landfills or received (including stored) in surface impoundments as so-called “special wastes” under the hazardous waste program of RCRA Subtitle C; or (2) regulating CCRs destined for disposal in landfills or surface impoundments as non-hazardous wastes under Subtitle D of RCRA.  Under both options, CCRs that are beneficially reused in certain processes would remain excluded from hazardous waste regulation. In April 2015 the EPA published the final CCR rule with the material being regulated under the second scenario presented above - as non-hazardous wastes regulated under RCRA Subtitle D. The final regulations create new compliance requirements including modified storage, new notification and reporting practices, product disposal considerations, and CCR unit closure criteria.  Entergy believes that on-site disposal options will be available at its facilities, to the extent needed for CCR that cannot be transferred for beneficial reuse.
Entergy Louisiana [Member]  
Asset Retirement Obligations
ASSET RETIREMENT OBLIGATIONS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Accounting standards require companies to record liabilities for all legal obligations associated with the retirement of long-lived assets that result from the normal operation of the assets.  For Entergy, substantially all of its asset retirement obligations consist of its liability for decommissioning its nuclear power plants.  In addition, an insignificant amount of removal costs associated with non-nuclear power plants is also included in the decommissioning line item on the balance sheets.
 
These liabilities are recorded at their fair values (which are the present values of the estimated future cash outflows) in the period in which they are incurred, with an accompanying addition to the recorded cost of the long-lived asset.  The asset retirement obligation is accreted each year through a charge to expense, to reflect the time value of money for this present value obligation.  The accretion will continue through the completion of the asset retirement activity.  The amounts added to the carrying amounts of the long-lived assets will be depreciated over the useful lives of the assets.  The application of accounting standards related to asset retirement obligations is earnings neutral to the rate-regulated business of the Registrant Subsidiaries.

In accordance with ratemaking treatment and as required by regulatory accounting standards, the depreciation provisions for the Registrant Subsidiaries include a component for removal costs that are not asset retirement obligations under accounting standards.  In accordance with regulatory accounting principles, the Registrant Subsidiaries have recorded regulatory assets (liabilities) in the following amounts to reflect their estimates of the difference between estimated incurred removal costs and estimated removal costs recovered in rates:
 
December 31,
 
2015
 
2014
 
(In Millions)
Entergy Arkansas
$85.7
 
$59.0
Entergy Louisiana
($68.3)
 
($82.6)
Entergy Mississippi
$77.5
 
$76.3
Entergy New Orleans
$29.4
 
$35.2
Entergy Texas
$25.8
 
$18.9
System Energy
$54.8
 
$55.7


The cumulative decommissioning and retirement cost liabilities and expenses recorded in 2015 by Entergy were as follows:
 
Liabilities as
of December 31,
2014
 
Liabilities Incurred (a)
 
 
 
Accretion
 
Change in
Cash Flow
Estimate
 
 
 
Spending
 
Liabilities as of December 31, 2015
 
(In Millions)
Utility:
 
 
 
 
 
 
 
 
 
 
 
Entergy Arkansas
$818.4
 

$3.5

 

$50.4

 

$—

 

$—

 

$872.3

Entergy Louisiana
$950.3
 

$1.9

 

$51.0

 

$24.7

 

$—

 

$1,027.9

Entergy Mississippi
$6.8
 

$1.1

 

$0.4

 

$—

 

$—

 

$8.3

Entergy New Orleans
$2.5
 

$—

 

$0.2

 

$—

 

$—

 

$2.7

Entergy Texas
$4.6
 

$1.4

 

$0.3

 

($0.2
)
 

$—

 

$6.1

System Energy
$757.9
 

$—

 

$48.0

 

($2.5
)
 

$—

 

$803.4

Entergy Wholesale Commodities
$1,917.8
 

$—

 

$153.8

 

$99.6

 

($101.7
)
 

$2,069.5


(a)
See “Coal Combustion Residuals” below for additional discussion regarding the asset retirement obligations related to coal combustion residuals management.
The cumulative decommissioning and retirement cost liabilities and expenses recorded in 2014 by Entergy were as follows:
 
Liabilities as
of December 31,
2013
 
 
 
Accretion
 
Change in
Cash Flow
Estimate
 
 
 
Spending
 
Liabilities as
 of December 31,
2014
 
(In Millions)
Utility:
 
 
 
 
 
 
 
 
 
Entergy Arkansas

$723.8

 

$47.0

 

$47.6

 

$—

 

$818.4

Entergy Louisiana

$882.2

 

$48.1

 

$20.0

 

$—

 

$950.3

Entergy Mississippi

$6.4

 

$0.4

 

$—

 

$—

 

$6.8

Entergy New Orleans

$2.3

 

$0.2

 

$—

 

$—

 

$2.5

Entergy Texas

$4.3

 

$0.3

 

$—

 

$—

 

$4.6

System Energy

$616.2

 

$41.8

 

$99.9

 

$—

 

$757.9

Entergy Wholesale Commodities

$1,698.2

 

$139.7

 

$101.6

 

($21.7
)
 

$1,917.8



Nuclear Plant Decommissioning

Entergy periodically reviews and updates estimated decommissioning costs.  The actual decommissioning costs may vary from the estimates because of regulatory requirements, changes in technology, and increased costs of labor, materials, and equipment.  As described below, during 2015 and 2014 Entergy updated decommissioning cost estimates for certain nuclear power plants.

In the second quarter 2015, Entergy Wholesale Commodities recorded a revision to its estimated decommissioning cost liability for a nuclear site as a result of a revised decommissioning cost study. The revised estimate resulted in a $77.6 million reduction in the decommissioning cost liability, along with a corresponding reduction in the related asset retirement cost asset.

In the third quarter 2015, Entergy Wholesale Commodities recorded a revision to its estimated decommissioning cost liability for Pilgrim as a result of a revised decommissioning cost study. The revised estimate resulted in a $134 million increase in the decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset. The increase in the estimated decommissioning cost liability resulted from the change in expectation regarding the timing of decommissioning cash flows due to the decision to cease operations of the plant no later than June 2019. The asset retirement cost asset was included in the Pilgrim carrying value that was written down to fair value in the third quarter 2015. See Note 1 to the financial statements for discussion of the impairment of the value and planned shutdown of the Pilgrim plant.

After shutdown, Pilgrim will transition to decommissioning. The Pilgrim nuclear decommissioning trust had a balance of approximately $896 million as of December 31, 2015, representing excess financial assurance of approximately $270 million for license termination activities above NRC-required assurance levels. Filings with the NRC for planned shutdown activities will determine whether any other financial assurance may be required and will specifically address funding for spent fuel management, which will be required until the federal government takes possession of the fuel and removes it from the site, per its current obligation. No additional funding is anticipated at this time.

In the fourth quarter 2015, Entergy Louisiana recorded a revision to its estimated decommissioning cost liability for Waterford 3 as a result of a revised decommissioning cost study.  The revised estimate resulted in a $24.9 million increase in its decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset that will be depreciated over the remaining life of the unit.

In the fourth quarter 2015, System Energy recorded a revision to its estimated decommissioning cost liability for Grand Gulf as a result of a revised decommissioning cost study.  The revised estimate resulted in a $2.5 million reduction in its decommissioning cost liability, along with a corresponding reduction in the related asset retirement cost asset that will be depreciated over the remaining life of the unit.

In the fourth quarter 2015, Entergy Wholesale Commodities recorded a revision to its estimated decommissioning cost liability for Palisades as a result of a revised decommissioning cost study. The revised estimate resulted in a $42.4 million increase in the decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset. The asset retirement cost asset was included in the Palisades carrying value that was written down to fair value in the fourth quarter 2015. See Note 1 to the financial statements for discussion of the impairment of the value of the Palisades plant.

In 2013, Entergy Wholesale Commodities recorded two revisions to its estimated decommissioning cost liability for Vermont Yankee. In the third quarter 2013, the estimated decommissioning cost liability increased by $58 million, along with a corresponding increase in the related asset retirement cost asset. The increase in the estimated decommissioning cost liability resulted from the change in expectation regarding the timing of decommissioning cash flows due to the decision to cease operations of the plant. The asset retirement cost asset was included in the carrying value used to write down Vermont Yankee and related assets to their fair values in the third quarter 2013. As a result of the settlement agreement regarding the remaining operation and decommissioning of Vermont Yankee, Entergy reassessed its assumptions regarding the timing of decommissioning cash flows. The reassessment resulted in a $27.2 million increase in the decommissioning cost liability and a corresponding impairment charge, recorded in fourth quarter 2013.

In accordance with the settlement agreement, Entergy Vermont Yankee provided to the Vermont parties, in 2014, a site assessment study of the costs and tasks of radiological decommissioning, spent nuclear fuel management, and site restoration for Vermont Yankee.  Entergy Vermont Yankee filed its Post-Shutdown Decommissioning Activities Report (PSDAR) for Vermont Yankee with the NRC in December 2014.  As part of the development of the site assessment study and PSDAR, Entergy obtained a revised decommissioning cost study in the third quarter 2014. The revised estimate, along with reassessment of the assumptions regarding the timing of decommissioning cash flows, resulted in a $101.6 million increase in the decommissioning cost liability and a corresponding impairment charge, recorded in September 2014.

Vermont Yankee submitted notification of permanent cessation of operations and permanent removal of fuel from the reactor in January 2015 after final shutdown in December 2014. Vermont Yankee’s future certifications to satisfy the NRC’s financial assurance requirements will now be based on the site specific cost estimate, including the estimated cost of managing spent fuel, rather than the NRC minimum formula for estimating decommissioning costs. Filings with the NRC for planned shutdown activities will determine whether any other financial assurance may be required and will specifically address funding for spent fuel management, which will be required until the federal government takes possession of the fuel and removes it from the site, per its current obligation.

Entergy expects that amounts available in Vermont Yankee’s decommissioning trust fund, including expected earnings, together with the credit facilities entered into in January 2015 that are expected to be repaid with recoveries from DOE litigation related to spent fuel storage, will be sufficient to cover Vermont Yankee’s expected costs of decommissioning, spent fuel management costs, and site restoration.  In June 2015 the NRC issued an exemption from its regulations to allow Vermont Yankee to use its decommissioning trust fund to pay for approximately $225 million of estimated future spent fuel management costs that will not be paid for using funds from the credit facilities.  In August 2015, Vermont and two Vermont utilities filed a petition in the U.S. Court of Appeals for the D.C. Circuit challenging the NRC’s issuance of that exemption.  If the appeal were to result in a final decision denying Vermont Yankee the exemption allowing the use of its decommissioning trust fund to pay for these spent fuel management costs, Vermont Yankee would have to satisfy the NRC that it had a plan to obtain additional funds to enable it to pay for these costs until the federal government takes possession of the fuel and removes it from the site. See Note 1 to the financial statements for further discussion regarding the Vermont Yankee plant.
In 2014, Entergy Arkansas recorded a revision to its estimated decommissioning cost liabilities for ANO 1 and ANO 2 as a result of a revised decommissioning cost study.  The revised estimates resulted in a $47.6 million increase in the decommissioning cost liabilities, along with a corresponding increase in the related asset retirement cost assets that will be depreciated over the remaining lives of the units.

In the fourth quarter 2014, Entergy Louisiana recorded a revision to its estimated decommissioning cost liability for River Bend as a result of a revised decommissioning cost study. The revised estimate resulted in a $20 million increase in the decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset that will be depreciated over the remaining useful life of the unit.

In the fourth quarter 2014, System Energy recorded a revision to its estimated decommissioning cost liability for Grand Gulf as a result of a revised decommissioning cost study.  The revised estimate resulted in a $99.9 million increase in its decommissioning liability, along with a corresponding increase in the related asset retirement cost asset that will be depreciated over the remaining life of the unit.

For the Indian Point 3 and FitzPatrick plants purchased in 2000, NYPA retained the decommissioning trusts and the decommissioning liabilities.  NYPA and Entergy subsidiaries executed decommissioning agreements, which specify their decommissioning obligations.  NYPA has the right to require the Entergy subsidiaries to assume each of the decommissioning liabilities provided that it assigns the corresponding decommissioning trust, up to a specified level, to the Entergy subsidiaries.  If the decommissioning liabilities are retained by NYPA, the Entergy subsidiaries will perform the decommissioning of the plants at a price equal to the lesser of a pre-specified level or the amount in the decommissioning trusts.  The contract asset represents an estimate of the present value of the difference between the stipulated contract amount for decommissioning the plants less the decommissioning costs estimated in independent decommissioning cost studies. The asset is increased by monthly accretion based on the applicable discount rate necessary to ultimately provide for the estimated future value of the decommissioning contract.  The monthly accretion is recorded as interest income.

In the third quarter 2015, Entergy Wholesale Commodities recorded a revision to the contract asset for the FitzPatrick plant. Due to a change in expectation regarding the timing of decommissioning cash flows, the result was a write down of the contract asset from $335 million to $131 million, for a charge of $204 million. See Note 1 to the financial statements for further discussion of the impairment of the value and planned shutdown of the FitzPatrick plant.

As of December 31, 2015 the contract asset for the Indian Point 3 and FitzPatrick plants is $420.8 million.

Entergy maintains decommissioning trust funds that are committed to meeting its obligations for the costs of decommissioning the nuclear power plants.  The fair values of the decommissioning trust funds and the related asset retirement obligation regulatory assets (liabilities) of Entergy as of December 31, 2015 are as follows:
 
Decommissioning
Trust Fair Values
 
Regulatory
Asset (Liability)
 
(In Millions)
Utility:
 
 
 
ANO 1 and ANO 2

$771.3

 

$280.3

River Bend

$651.7

 

($26.8
)
Waterford 3

$390.6

 

$158.5

Grand Gulf

$701.5

 

$108.6

Entergy Wholesale Commodities

$2,834.9

 

$—


The fair values of the decommissioning trust funds and the related asset retirement obligation regulatory assets (liabilities) of Entergy as of December 31, 2014 are as follows:
 
Decommissioning
Trust Fair Values
 
Regulatory
Asset (Liability)
 
(In Millions)
Utility:
 
 
 
ANO 1 and ANO 2

$769.9

 

$247.6

River Bend

$637.7

 

($25.5
)
Waterford 3

$383.6

 

$145.5

Grand Gulf

$679.8

 

$80.4

Entergy Wholesale Commodities

$2,899.9

 

$—


Coal Combustion Residuals

In June 2010 the EPA issued a proposed rule on coal combustion residuals (CCRs) that contained two primary regulatory options: (1) regulating CCRs destined for disposal in landfills or received (including stored) in surface impoundments as so-called “special wastes” under the hazardous waste program of RCRA Subtitle C; or (2) regulating CCRs destined for disposal in landfills or surface impoundments as non-hazardous wastes under Subtitle D of RCRA.  Under both options, CCRs that are beneficially reused in certain processes would remain excluded from hazardous waste regulation. In April 2015 the EPA published the final CCR rule with the material being regulated under the second scenario presented above - as non-hazardous wastes regulated under RCRA Subtitle D. The final regulations create new compliance requirements including modified storage, new notification and reporting practices, product disposal considerations, and CCR unit closure criteria.  Entergy believes that on-site disposal options will be available at its facilities, to the extent needed for CCR that cannot be transferred for beneficial reuse.
Entergy Mississippi [Member]  
Asset Retirement Obligations
ASSET RETIREMENT OBLIGATIONS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Accounting standards require companies to record liabilities for all legal obligations associated with the retirement of long-lived assets that result from the normal operation of the assets.  For Entergy, substantially all of its asset retirement obligations consist of its liability for decommissioning its nuclear power plants.  In addition, an insignificant amount of removal costs associated with non-nuclear power plants is also included in the decommissioning line item on the balance sheets.
 
These liabilities are recorded at their fair values (which are the present values of the estimated future cash outflows) in the period in which they are incurred, with an accompanying addition to the recorded cost of the long-lived asset.  The asset retirement obligation is accreted each year through a charge to expense, to reflect the time value of money for this present value obligation.  The accretion will continue through the completion of the asset retirement activity.  The amounts added to the carrying amounts of the long-lived assets will be depreciated over the useful lives of the assets.  The application of accounting standards related to asset retirement obligations is earnings neutral to the rate-regulated business of the Registrant Subsidiaries.

In accordance with ratemaking treatment and as required by regulatory accounting standards, the depreciation provisions for the Registrant Subsidiaries include a component for removal costs that are not asset retirement obligations under accounting standards.  In accordance with regulatory accounting principles, the Registrant Subsidiaries have recorded regulatory assets (liabilities) in the following amounts to reflect their estimates of the difference between estimated incurred removal costs and estimated removal costs recovered in rates:
 
December 31,
 
2015
 
2014
 
(In Millions)
Entergy Arkansas
$85.7
 
$59.0
Entergy Louisiana
($68.3)
 
($82.6)
Entergy Mississippi
$77.5
 
$76.3
Entergy New Orleans
$29.4
 
$35.2
Entergy Texas
$25.8
 
$18.9
System Energy
$54.8
 
$55.7


The cumulative decommissioning and retirement cost liabilities and expenses recorded in 2015 by Entergy were as follows:
 
Liabilities as
of December 31,
2014
 
Liabilities Incurred (a)
 
 
 
Accretion
 
Change in
Cash Flow
Estimate
 
 
 
Spending
 
Liabilities as of December 31, 2015
 
(In Millions)
Utility:
 
 
 
 
 
 
 
 
 
 
 
Entergy Arkansas
$818.4
 

$3.5

 

$50.4

 

$—

 

$—

 

$872.3

Entergy Louisiana
$950.3
 

$1.9

 

$51.0

 

$24.7

 

$—

 

$1,027.9

Entergy Mississippi
$6.8
 

$1.1

 

$0.4

 

$—

 

$—

 

$8.3

Entergy New Orleans
$2.5
 

$—

 

$0.2

 

$—

 

$—

 

$2.7

Entergy Texas
$4.6
 

$1.4

 

$0.3

 

($0.2
)
 

$—

 

$6.1

System Energy
$757.9
 

$—

 

$48.0

 

($2.5
)
 

$—

 

$803.4

Entergy Wholesale Commodities
$1,917.8
 

$—

 

$153.8

 

$99.6

 

($101.7
)
 

$2,069.5


(a)
See “Coal Combustion Residuals” below for additional discussion regarding the asset retirement obligations related to coal combustion residuals management.
The cumulative decommissioning and retirement cost liabilities and expenses recorded in 2014 by Entergy were as follows:
 
Liabilities as
of December 31,
2013
 
 
 
Accretion
 
Change in
Cash Flow
Estimate
 
 
 
Spending
 
Liabilities as
 of December 31,
2014
 
(In Millions)
Utility:
 
 
 
 
 
 
 
 
 
Entergy Arkansas

$723.8

 

$47.0

 

$47.6

 

$—

 

$818.4

Entergy Louisiana

$882.2

 

$48.1

 

$20.0

 

$—

 

$950.3

Entergy Mississippi

$6.4

 

$0.4

 

$—

 

$—

 

$6.8

Entergy New Orleans

$2.3

 

$0.2

 

$—

 

$—

 

$2.5

Entergy Texas

$4.3

 

$0.3

 

$—

 

$—

 

$4.6

System Energy

$616.2

 

$41.8

 

$99.9

 

$—

 

$757.9

Entergy Wholesale Commodities

$1,698.2

 

$139.7

 

$101.6

 

($21.7
)
 

$1,917.8



Nuclear Plant Decommissioning

Entergy periodically reviews and updates estimated decommissioning costs.  The actual decommissioning costs may vary from the estimates because of regulatory requirements, changes in technology, and increased costs of labor, materials, and equipment.  As described below, during 2015 and 2014 Entergy updated decommissioning cost estimates for certain nuclear power plants.

In the second quarter 2015, Entergy Wholesale Commodities recorded a revision to its estimated decommissioning cost liability for a nuclear site as a result of a revised decommissioning cost study. The revised estimate resulted in a $77.6 million reduction in the decommissioning cost liability, along with a corresponding reduction in the related asset retirement cost asset.

In the third quarter 2015, Entergy Wholesale Commodities recorded a revision to its estimated decommissioning cost liability for Pilgrim as a result of a revised decommissioning cost study. The revised estimate resulted in a $134 million increase in the decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset. The increase in the estimated decommissioning cost liability resulted from the change in expectation regarding the timing of decommissioning cash flows due to the decision to cease operations of the plant no later than June 2019. The asset retirement cost asset was included in the Pilgrim carrying value that was written down to fair value in the third quarter 2015. See Note 1 to the financial statements for discussion of the impairment of the value and planned shutdown of the Pilgrim plant.

After shutdown, Pilgrim will transition to decommissioning. The Pilgrim nuclear decommissioning trust had a balance of approximately $896 million as of December 31, 2015, representing excess financial assurance of approximately $270 million for license termination activities above NRC-required assurance levels. Filings with the NRC for planned shutdown activities will determine whether any other financial assurance may be required and will specifically address funding for spent fuel management, which will be required until the federal government takes possession of the fuel and removes it from the site, per its current obligation. No additional funding is anticipated at this time.

In the fourth quarter 2015, Entergy Louisiana recorded a revision to its estimated decommissioning cost liability for Waterford 3 as a result of a revised decommissioning cost study.  The revised estimate resulted in a $24.9 million increase in its decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset that will be depreciated over the remaining life of the unit.

In the fourth quarter 2015, System Energy recorded a revision to its estimated decommissioning cost liability for Grand Gulf as a result of a revised decommissioning cost study.  The revised estimate resulted in a $2.5 million reduction in its decommissioning cost liability, along with a corresponding reduction in the related asset retirement cost asset that will be depreciated over the remaining life of the unit.

In the fourth quarter 2015, Entergy Wholesale Commodities recorded a revision to its estimated decommissioning cost liability for Palisades as a result of a revised decommissioning cost study. The revised estimate resulted in a $42.4 million increase in the decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset. The asset retirement cost asset was included in the Palisades carrying value that was written down to fair value in the fourth quarter 2015. See Note 1 to the financial statements for discussion of the impairment of the value of the Palisades plant.

In 2013, Entergy Wholesale Commodities recorded two revisions to its estimated decommissioning cost liability for Vermont Yankee. In the third quarter 2013, the estimated decommissioning cost liability increased by $58 million, along with a corresponding increase in the related asset retirement cost asset. The increase in the estimated decommissioning cost liability resulted from the change in expectation regarding the timing of decommissioning cash flows due to the decision to cease operations of the plant. The asset retirement cost asset was included in the carrying value used to write down Vermont Yankee and related assets to their fair values in the third quarter 2013. As a result of the settlement agreement regarding the remaining operation and decommissioning of Vermont Yankee, Entergy reassessed its assumptions regarding the timing of decommissioning cash flows. The reassessment resulted in a $27.2 million increase in the decommissioning cost liability and a corresponding impairment charge, recorded in fourth quarter 2013.

In accordance with the settlement agreement, Entergy Vermont Yankee provided to the Vermont parties, in 2014, a site assessment study of the costs and tasks of radiological decommissioning, spent nuclear fuel management, and site restoration for Vermont Yankee.  Entergy Vermont Yankee filed its Post-Shutdown Decommissioning Activities Report (PSDAR) for Vermont Yankee with the NRC in December 2014.  As part of the development of the site assessment study and PSDAR, Entergy obtained a revised decommissioning cost study in the third quarter 2014. The revised estimate, along with reassessment of the assumptions regarding the timing of decommissioning cash flows, resulted in a $101.6 million increase in the decommissioning cost liability and a corresponding impairment charge, recorded in September 2014.

Vermont Yankee submitted notification of permanent cessation of operations and permanent removal of fuel from the reactor in January 2015 after final shutdown in December 2014. Vermont Yankee’s future certifications to satisfy the NRC’s financial assurance requirements will now be based on the site specific cost estimate, including the estimated cost of managing spent fuel, rather than the NRC minimum formula for estimating decommissioning costs. Filings with the NRC for planned shutdown activities will determine whether any other financial assurance may be required and will specifically address funding for spent fuel management, which will be required until the federal government takes possession of the fuel and removes it from the site, per its current obligation.

Entergy expects that amounts available in Vermont Yankee’s decommissioning trust fund, including expected earnings, together with the credit facilities entered into in January 2015 that are expected to be repaid with recoveries from DOE litigation related to spent fuel storage, will be sufficient to cover Vermont Yankee’s expected costs of decommissioning, spent fuel management costs, and site restoration.  In June 2015 the NRC issued an exemption from its regulations to allow Vermont Yankee to use its decommissioning trust fund to pay for approximately $225 million of estimated future spent fuel management costs that will not be paid for using funds from the credit facilities.  In August 2015, Vermont and two Vermont utilities filed a petition in the U.S. Court of Appeals for the D.C. Circuit challenging the NRC’s issuance of that exemption.  If the appeal were to result in a final decision denying Vermont Yankee the exemption allowing the use of its decommissioning trust fund to pay for these spent fuel management costs, Vermont Yankee would have to satisfy the NRC that it had a plan to obtain additional funds to enable it to pay for these costs until the federal government takes possession of the fuel and removes it from the site. See Note 1 to the financial statements for further discussion regarding the Vermont Yankee plant.
In 2014, Entergy Arkansas recorded a revision to its estimated decommissioning cost liabilities for ANO 1 and ANO 2 as a result of a revised decommissioning cost study.  The revised estimates resulted in a $47.6 million increase in the decommissioning cost liabilities, along with a corresponding increase in the related asset retirement cost assets that will be depreciated over the remaining lives of the units.

In the fourth quarter 2014, Entergy Louisiana recorded a revision to its estimated decommissioning cost liability for River Bend as a result of a revised decommissioning cost study. The revised estimate resulted in a $20 million increase in the decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset that will be depreciated over the remaining useful life of the unit.

In the fourth quarter 2014, System Energy recorded a revision to its estimated decommissioning cost liability for Grand Gulf as a result of a revised decommissioning cost study.  The revised estimate resulted in a $99.9 million increase in its decommissioning liability, along with a corresponding increase in the related asset retirement cost asset that will be depreciated over the remaining life of the unit.

For the Indian Point 3 and FitzPatrick plants purchased in 2000, NYPA retained the decommissioning trusts and the decommissioning liabilities.  NYPA and Entergy subsidiaries executed decommissioning agreements, which specify their decommissioning obligations.  NYPA has the right to require the Entergy subsidiaries to assume each of the decommissioning liabilities provided that it assigns the corresponding decommissioning trust, up to a specified level, to the Entergy subsidiaries.  If the decommissioning liabilities are retained by NYPA, the Entergy subsidiaries will perform the decommissioning of the plants at a price equal to the lesser of a pre-specified level or the amount in the decommissioning trusts.  The contract asset represents an estimate of the present value of the difference between the stipulated contract amount for decommissioning the plants less the decommissioning costs estimated in independent decommissioning cost studies. The asset is increased by monthly accretion based on the applicable discount rate necessary to ultimately provide for the estimated future value of the decommissioning contract.  The monthly accretion is recorded as interest income.

In the third quarter 2015, Entergy Wholesale Commodities recorded a revision to the contract asset for the FitzPatrick plant. Due to a change in expectation regarding the timing of decommissioning cash flows, the result was a write down of the contract asset from $335 million to $131 million, for a charge of $204 million. See Note 1 to the financial statements for further discussion of the impairment of the value and planned shutdown of the FitzPatrick plant.

As of December 31, 2015 the contract asset for the Indian Point 3 and FitzPatrick plants is $420.8 million.

Entergy maintains decommissioning trust funds that are committed to meeting its obligations for the costs of decommissioning the nuclear power plants.  The fair values of the decommissioning trust funds and the related asset retirement obligation regulatory assets (liabilities) of Entergy as of December 31, 2015 are as follows:
 
Decommissioning
Trust Fair Values
 
Regulatory
Asset (Liability)
 
(In Millions)
Utility:
 
 
 
ANO 1 and ANO 2

$771.3

 

$280.3

River Bend

$651.7

 

($26.8
)
Waterford 3

$390.6

 

$158.5

Grand Gulf

$701.5

 

$108.6

Entergy Wholesale Commodities

$2,834.9

 

$—


The fair values of the decommissioning trust funds and the related asset retirement obligation regulatory assets (liabilities) of Entergy as of December 31, 2014 are as follows:
 
Decommissioning
Trust Fair Values
 
Regulatory
Asset (Liability)
 
(In Millions)
Utility:
 
 
 
ANO 1 and ANO 2

$769.9

 

$247.6

River Bend

$637.7

 

($25.5
)
Waterford 3

$383.6

 

$145.5

Grand Gulf

$679.8

 

$80.4

Entergy Wholesale Commodities

$2,899.9

 

$—


Coal Combustion Residuals

In June 2010 the EPA issued a proposed rule on coal combustion residuals (CCRs) that contained two primary regulatory options: (1) regulating CCRs destined for disposal in landfills or received (including stored) in surface impoundments as so-called “special wastes” under the hazardous waste program of RCRA Subtitle C; or (2) regulating CCRs destined for disposal in landfills or surface impoundments as non-hazardous wastes under Subtitle D of RCRA.  Under both options, CCRs that are beneficially reused in certain processes would remain excluded from hazardous waste regulation. In April 2015 the EPA published the final CCR rule with the material being regulated under the second scenario presented above - as non-hazardous wastes regulated under RCRA Subtitle D. The final regulations create new compliance requirements including modified storage, new notification and reporting practices, product disposal considerations, and CCR unit closure criteria.  Entergy believes that on-site disposal options will be available at its facilities, to the extent needed for CCR that cannot be transferred for beneficial reuse.
Entergy New Orleans [Member]  
Asset Retirement Obligations
Accounting standards require companies to record liabilities for all legal obligations associated with the retirement of long-lived assets that result from the normal operation of the assets.  For Entergy, substantially all of its asset retirement obligations consist of its liability for decommissioning its nuclear power plants.  In addition, an insignificant amount of removal costs associated with non-nuclear power plants is also included in the decommissioning line item on the balance sheets.
 
These liabilities are recorded at their fair values (which are the present values of the estimated future cash outflows) in the period in which they are incurred, with an accompanying addition to the recorded cost of the long-lived asset.  The asset retirement obligation is accreted each year through a charge to expense, to reflect the time value of money for this present value obligation.  The accretion will continue through the completion of the asset retirement activity.  The amounts added to the carrying amounts of the long-lived assets will be depreciated over the useful lives of the assets.  The application of accounting standards related to asset retirement obligations is earnings neutral to the rate-regulated business of the Registrant Subsidiaries.

In accordance with ratemaking treatment and as required by regulatory accounting standards, the depreciation provisions for the Registrant Subsidiaries include a component for removal costs that are not asset retirement obligations under accounting standards.  In accordance with regulatory accounting principles, the Registrant Subsidiaries have recorded regulatory assets (liabilities) in the following amounts to reflect their estimates of the difference between estimated incurred removal costs and estimated removal costs recovered in rates:
 
December 31,
 
2015
 
2014
 
(In Millions)
Entergy Arkansas
$85.7
 
$59.0
Entergy Louisiana
($68.3)
 
($82.6)
Entergy Mississippi
$77.5
 
$76.3
Entergy New Orleans
$29.4
 
$35.2
Entergy Texas
$25.8
 
$18.9
System Energy
$54.8
 
$55.7


The cumulative decommissioning and retirement cost liabilities and expenses recorded in 2015 by Entergy were as follows:
 
Liabilities as
of December 31,
2014
 
Liabilities Incurred (a)
 
 
 
Accretion
 
Change in
Cash Flow
Estimate
 
 
 
Spending
 
Liabilities as of December 31, 2015
 
(In Millions)
Utility:
 
 
 
 
 
 
 
 
 
 
 
Entergy Arkansas
$818.4
 

$3.5

 

$50.4

 

$—

 

$—

 

$872.3

Entergy Louisiana
$950.3
 

$1.9

 

$51.0

 

$24.7

 

$—

 

$1,027.9

Entergy Mississippi
$6.8
 

$1.1

 

$0.4

 

$—

 

$—

 

$8.3

Entergy New Orleans
$2.5
 

$—

 

$0.2

 

$—

 

$—

 

$2.7

Entergy Texas
$4.6
 

$1.4

 

$0.3

 

($0.2
)
 

$—

 

$6.1

System Energy
$757.9
 

$—

 

$48.0

 

($2.5
)
 

$—

 

$803.4

Entergy Wholesale Commodities
$1,917.8
 

$—

 

$153.8

 

$99.6

 

($101.7
)
 

$2,069.5


(a)
See “Coal Combustion Residuals” below for additional discussion regarding the asset retirement obligations related to coal combustion residuals management.
The cumulative decommissioning and retirement cost liabilities and expenses recorded in 2014 by Entergy were as follows:
 
Liabilities as
of December 31,
2013
 
 
 
Accretion
 
Change in
Cash Flow
Estimate
 
 
 
Spending
 
Liabilities as
 of December 31,
2014
 
(In Millions)
Utility:
 
 
 
 
 
 
 
 
 
Entergy Arkansas

$723.8

 

$47.0

 

$47.6

 

$—

 

$818.4

Entergy Louisiana

$882.2

 

$48.1

 

$20.0

 

$—

 

$950.3

Entergy Mississippi

$6.4

 

$0.4

 

$—

 

$—

 

$6.8

Entergy New Orleans

$2.3

 

$0.2

 

$—

 

$—

 

$2.5

Entergy Texas

$4.3

 

$0.3

 

$—

 

$—

 

$4.6

System Energy

$616.2

 

$41.8

 

$99.9

 

$—

 

$757.9

Entergy Wholesale Commodities

$1,698.2

 

$139.7

 

$101.6

 

($21.7
)
 

$1,917.8



Nuclear Plant Decommissioning

Entergy periodically reviews and updates estimated decommissioning costs.  The actual decommissioning costs may vary from the estimates because of regulatory requirements, changes in technology, and increased costs of labor, materials, and equipment.  As described below, during 2015 and 2014 Entergy updated decommissioning cost estimates for certain nuclear power plants.

In the second quarter 2015, Entergy Wholesale Commodities recorded a revision to its estimated decommissioning cost liability for a nuclear site as a result of a revised decommissioning cost study. The revised estimate resulted in a $77.6 million reduction in the decommissioning cost liability, along with a corresponding reduction in the related asset retirement cost asset.

In the third quarter 2015, Entergy Wholesale Commodities recorded a revision to its estimated decommissioning cost liability for Pilgrim as a result of a revised decommissioning cost study. The revised estimate resulted in a $134 million increase in the decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset. The increase in the estimated decommissioning cost liability resulted from the change in expectation regarding the timing of decommissioning cash flows due to the decision to cease operations of the plant no later than June 2019. The asset retirement cost asset was included in the Pilgrim carrying value that was written down to fair value in the third quarter 2015. See Note 1 to the financial statements for discussion of the impairment of the value and planned shutdown of the Pilgrim plant.

After shutdown, Pilgrim will transition to decommissioning. The Pilgrim nuclear decommissioning trust had a balance of approximately $896 million as of December 31, 2015, representing excess financial assurance of approximately $270 million for license termination activities above NRC-required assurance levels. Filings with the NRC for planned shutdown activities will determine whether any other financial assurance may be required and will specifically address funding for spent fuel management, which will be required until the federal government takes possession of the fuel and removes it from the site, per its current obligation. No additional funding is anticipated at this time.

In the fourth quarter 2015, Entergy Louisiana recorded a revision to its estimated decommissioning cost liability for Waterford 3 as a result of a revised decommissioning cost study.  The revised estimate resulted in a $24.9 million increase in its decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset that will be depreciated over the remaining life of the unit.

In the fourth quarter 2015, System Energy recorded a revision to its estimated decommissioning cost liability for Grand Gulf as a result of a revised decommissioning cost study.  The revised estimate resulted in a $2.5 million reduction in its decommissioning cost liability, along with a corresponding reduction in the related asset retirement cost asset that will be depreciated over the remaining life of the unit.

In the fourth quarter 2015, Entergy Wholesale Commodities recorded a revision to its estimated decommissioning cost liability for Palisades as a result of a revised decommissioning cost study. The revised estimate resulted in a $42.4 million increase in the decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset. The asset retirement cost asset was included in the Palisades carrying value that was written down to fair value in the fourth quarter 2015. See Note 1 to the financial statements for discussion of the impairment of the value of the Palisades plant.

In 2013, Entergy Wholesale Commodities recorded two revisions to its estimated decommissioning cost liability for Vermont Yankee. In the third quarter 2013, the estimated decommissioning cost liability increased by $58 million, along with a corresponding increase in the related asset retirement cost asset. The increase in the estimated decommissioning cost liability resulted from the change in expectation regarding the timing of decommissioning cash flows due to the decision to cease operations of the plant. The asset retirement cost asset was included in the carrying value used to write down Vermont Yankee and related assets to their fair values in the third quarter 2013. As a result of the settlement agreement regarding the remaining operation and decommissioning of Vermont Yankee, Entergy reassessed its assumptions regarding the timing of decommissioning cash flows. The reassessment resulted in a $27.2 million increase in the decommissioning cost liability and a corresponding impairment charge, recorded in fourth quarter 2013.

In accordance with the settlement agreement, Entergy Vermont Yankee provided to the Vermont parties, in 2014, a site assessment study of the costs and tasks of radiological decommissioning, spent nuclear fuel management, and site restoration for Vermont Yankee.  Entergy Vermont Yankee filed its Post-Shutdown Decommissioning Activities Report (PSDAR) for Vermont Yankee with the NRC in December 2014.  As part of the development of the site assessment study and PSDAR, Entergy obtained a revised decommissioning cost study in the third quarter 2014. The revised estimate, along with reassessment of the assumptions regarding the timing of decommissioning cash flows, resulted in a $101.6 million increase in the decommissioning cost liability and a corresponding impairment charge, recorded in September 2014.

Vermont Yankee submitted notification of permanent cessation of operations and permanent removal of fuel from the reactor in January 2015 after final shutdown in December 2014. Vermont Yankee’s future certifications to satisfy the NRC’s financial assurance requirements will now be based on the site specific cost estimate, including the estimated cost of managing spent fuel, rather than the NRC minimum formula for estimating decommissioning costs. Filings with the NRC for planned shutdown activities will determine whether any other financial assurance may be required and will specifically address funding for spent fuel management, which will be required until the federal government takes possession of the fuel and removes it from the site, per its current obligation.

Entergy expects that amounts available in Vermont Yankee’s decommissioning trust fund, including expected earnings, together with the credit facilities entered into in January 2015 that are expected to be repaid with recoveries from DOE litigation related to spent fuel storage, will be sufficient to cover Vermont Yankee’s expected costs of decommissioning, spent fuel management costs, and site restoration.  In June 2015 the NRC issued an exemption from its regulations to allow Vermont Yankee to use its decommissioning trust fund to pay for approximately $225 million of estimated future spent fuel management costs that will not be paid for using funds from the credit facilities.  In August 2015, Vermont and two Vermont utilities filed a petition in the U.S. Court of Appeals for the D.C. Circuit challenging the NRC’s issuance of that exemption.  If the appeal were to result in a final decision denying Vermont Yankee the exemption allowing the use of its decommissioning trust fund to pay for these spent fuel management costs, Vermont Yankee would have to satisfy the NRC that it had a plan to obtain additional funds to enable it to pay for these costs until the federal government takes possession of the fuel and removes it from the site. See Note 1 to the financial statements for further discussion regarding the Vermont Yankee plant.
In 2014, Entergy Arkansas recorded a revision to its estimated decommissioning cost liabilities for ANO 1 and ANO 2 as a result of a revised decommissioning cost study.  The revised estimates resulted in a $47.6 million increase in the decommissioning cost liabilities, along with a corresponding increase in the related asset retirement cost assets that will be depreciated over the remaining lives of the units.

In the fourth quarter 2014, Entergy Louisiana recorded a revision to its estimated decommissioning cost liability for River Bend as a result of a revised decommissioning cost study. The revised estimate resulted in a $20 million increase in the decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset that will be depreciated over the remaining useful life of the unit.

In the fourth quarter 2014, System Energy recorded a revision to its estimated decommissioning cost liability for Grand Gulf as a result of a revised decommissioning cost study.  The revised estimate resulted in a $99.9 million increase in its decommissioning liability, along with a corresponding increase in the related asset retirement cost asset that will be depreciated over the remaining life of the unit.

For the Indian Point 3 and FitzPatrick plants purchased in 2000, NYPA retained the decommissioning trusts and the decommissioning liabilities.  NYPA and Entergy subsidiaries executed decommissioning agreements, which specify their decommissioning obligations.  NYPA has the right to require the Entergy subsidiaries to assume each of the decommissioning liabilities provided that it assigns the corresponding decommissioning trust, up to a specified level, to the Entergy subsidiaries.  If the decommissioning liabilities are retained by NYPA, the Entergy subsidiaries will perform the decommissioning of the plants at a price equal to the lesser of a pre-specified level or the amount in the decommissioning trusts.  The contract asset represents an estimate of the present value of the difference between the stipulated contract amount for decommissioning the plants less the decommissioning costs estimated in independent decommissioning cost studies. The asset is increased by monthly accretion based on the applicable discount rate necessary to ultimately provide for the estimated future value of the decommissioning contract.  The monthly accretion is recorded as interest income.

In the third quarter 2015, Entergy Wholesale Commodities recorded a revision to the contract asset for the FitzPatrick plant. Due to a change in expectation regarding the timing of decommissioning cash flows, the result was a write down of the contract asset from $335 million to $131 million, for a charge of $204 million. See Note 1 to the financial statements for further discussion of the impairment of the value and planned shutdown of the FitzPatrick plant.

As of December 31, 2015 the contract asset for the Indian Point 3 and FitzPatrick plants is $420.8 million.

Entergy maintains decommissioning trust funds that are committed to meeting its obligations for the costs of decommissioning the nuclear power plants.  The fair values of the decommissioning trust funds and the related asset retirement obligation regulatory assets (liabilities) of Entergy as of December 31, 2015 are as follows:
 
Decommissioning
Trust Fair Values
 
Regulatory
Asset (Liability)
 
(In Millions)
Utility:
 
 
 
ANO 1 and ANO 2

$771.3

 

$280.3

River Bend

$651.7

 

($26.8
)
Waterford 3

$390.6

 

$158.5

Grand Gulf

$701.5

 

$108.6

Entergy Wholesale Commodities

$2,834.9

 

$—


The fair values of the decommissioning trust funds and the related asset retirement obligation regulatory assets (liabilities) of Entergy as of December 31, 2014 are as follows:
 
Decommissioning
Trust Fair Values
 
Regulatory
Asset (Liability)
 
(In Millions)
Utility:
 
 
 
ANO 1 and ANO 2

$769.9

 

$247.6

River Bend

$637.7

 

($25.5
)
Waterford 3

$383.6

 

$145.5

Grand Gulf

$679.8

 

$80.4

Entergy Wholesale Commodities

$2,899.9

 

$—


Coal Combustion Residuals

In June 2010 the EPA issued a proposed rule on coal combustion residuals (CCRs) that contained two primary regulatory options: (1) regulating CCRs destined for disposal in landfills or received (including stored) in surface impoundments as so-called “special wastes” under the hazardous waste program of RCRA Subtitle C; or (2) regulating CCRs destined for disposal in landfills or surface impoundments as non-hazardous wastes under Subtitle D of RCRA.  Under both options, CCRs that are beneficially reused in certain processes would remain excluded from hazardous waste regulation. In April 2015 the EPA published the final CCR rule with the material being regulated under the second scenario presented above - as non-hazardous wastes regulated under RCRA Subtitle D. The final regulations create new compliance requirements including modified storage, new notification and reporting practices, product disposal considerations, and CCR unit closure criteria.  Entergy believes that on-site disposal options will be available at its facilities, to the extent needed for CCR that cannot be transferred for beneficial reuse.
Entergy Texas [Member]  
Asset Retirement Obligations
ASSET RETIREMENT OBLIGATIONS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Accounting standards require companies to record liabilities for all legal obligations associated with the retirement of long-lived assets that result from the normal operation of the assets.  For Entergy, substantially all of its asset retirement obligations consist of its liability for decommissioning its nuclear power plants.  In addition, an insignificant amount of removal costs associated with non-nuclear power plants is also included in the decommissioning line item on the balance sheets.
 
These liabilities are recorded at their fair values (which are the present values of the estimated future cash outflows) in the period in which they are incurred, with an accompanying addition to the recorded cost of the long-lived asset.  The asset retirement obligation is accreted each year through a charge to expense, to reflect the time value of money for this present value obligation.  The accretion will continue through the completion of the asset retirement activity.  The amounts added to the carrying amounts of the long-lived assets will be depreciated over the useful lives of the assets.  The application of accounting standards related to asset retirement obligations is earnings neutral to the rate-regulated business of the Registrant Subsidiaries.

In accordance with ratemaking treatment and as required by regulatory accounting standards, the depreciation provisions for the Registrant Subsidiaries include a component for removal costs that are not asset retirement obligations under accounting standards.  In accordance with regulatory accounting principles, the Registrant Subsidiaries have recorded regulatory assets (liabilities) in the following amounts to reflect their estimates of the difference between estimated incurred removal costs and estimated removal costs recovered in rates:
 
December 31,
 
2015
 
2014
 
(In Millions)
Entergy Arkansas
$85.7
 
$59.0
Entergy Louisiana
($68.3)
 
($82.6)
Entergy Mississippi
$77.5
 
$76.3
Entergy New Orleans
$29.4
 
$35.2
Entergy Texas
$25.8
 
$18.9
System Energy
$54.8
 
$55.7


The cumulative decommissioning and retirement cost liabilities and expenses recorded in 2015 by Entergy were as follows:
 
Liabilities as
of December 31,
2014
 
Liabilities Incurred (a)
 
 
 
Accretion
 
Change in
Cash Flow
Estimate
 
 
 
Spending
 
Liabilities as of December 31, 2015
 
(In Millions)
Utility:
 
 
 
 
 
 
 
 
 
 
 
Entergy Arkansas
$818.4
 

$3.5

 

$50.4

 

$—

 

$—

 

$872.3

Entergy Louisiana
$950.3
 

$1.9

 

$51.0

 

$24.7

 

$—

 

$1,027.9

Entergy Mississippi
$6.8
 

$1.1

 

$0.4

 

$—

 

$—

 

$8.3

Entergy New Orleans
$2.5
 

$—

 

$0.2

 

$—

 

$—

 

$2.7

Entergy Texas
$4.6
 

$1.4

 

$0.3

 

($0.2
)
 

$—

 

$6.1

System Energy
$757.9
 

$—

 

$48.0

 

($2.5
)
 

$—

 

$803.4

Entergy Wholesale Commodities
$1,917.8
 

$—

 

$153.8

 

$99.6

 

($101.7
)
 

$2,069.5


(a)
See “Coal Combustion Residuals” below for additional discussion regarding the asset retirement obligations related to coal combustion residuals management.
The cumulative decommissioning and retirement cost liabilities and expenses recorded in 2014 by Entergy were as follows:
 
Liabilities as
of December 31,
2013
 
 
 
Accretion
 
Change in
Cash Flow
Estimate
 
 
 
Spending
 
Liabilities as
 of December 31,
2014
 
(In Millions)
Utility:
 
 
 
 
 
 
 
 
 
Entergy Arkansas

$723.8

 

$47.0

 

$47.6

 

$—

 

$818.4

Entergy Louisiana

$882.2

 

$48.1

 

$20.0

 

$—

 

$950.3

Entergy Mississippi

$6.4

 

$0.4

 

$—

 

$—

 

$6.8

Entergy New Orleans

$2.3

 

$0.2

 

$—

 

$—

 

$2.5

Entergy Texas

$4.3

 

$0.3

 

$—

 

$—

 

$4.6

System Energy

$616.2

 

$41.8

 

$99.9

 

$—

 

$757.9

Entergy Wholesale Commodities

$1,698.2

 

$139.7

 

$101.6

 

($21.7
)
 

$1,917.8



Nuclear Plant Decommissioning

Entergy periodically reviews and updates estimated decommissioning costs.  The actual decommissioning costs may vary from the estimates because of regulatory requirements, changes in technology, and increased costs of labor, materials, and equipment.  As described below, during 2015 and 2014 Entergy updated decommissioning cost estimates for certain nuclear power plants.

In the second quarter 2015, Entergy Wholesale Commodities recorded a revision to its estimated decommissioning cost liability for a nuclear site as a result of a revised decommissioning cost study. The revised estimate resulted in a $77.6 million reduction in the decommissioning cost liability, along with a corresponding reduction in the related asset retirement cost asset.

In the third quarter 2015, Entergy Wholesale Commodities recorded a revision to its estimated decommissioning cost liability for Pilgrim as a result of a revised decommissioning cost study. The revised estimate resulted in a $134 million increase in the decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset. The increase in the estimated decommissioning cost liability resulted from the change in expectation regarding the timing of decommissioning cash flows due to the decision to cease operations of the plant no later than June 2019. The asset retirement cost asset was included in the Pilgrim carrying value that was written down to fair value in the third quarter 2015. See Note 1 to the financial statements for discussion of the impairment of the value and planned shutdown of the Pilgrim plant.

After shutdown, Pilgrim will transition to decommissioning. The Pilgrim nuclear decommissioning trust had a balance of approximately $896 million as of December 31, 2015, representing excess financial assurance of approximately $270 million for license termination activities above NRC-required assurance levels. Filings with the NRC for planned shutdown activities will determine whether any other financial assurance may be required and will specifically address funding for spent fuel management, which will be required until the federal government takes possession of the fuel and removes it from the site, per its current obligation. No additional funding is anticipated at this time.

In the fourth quarter 2015, Entergy Louisiana recorded a revision to its estimated decommissioning cost liability for Waterford 3 as a result of a revised decommissioning cost study.  The revised estimate resulted in a $24.9 million increase in its decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset that will be depreciated over the remaining life of the unit.

In the fourth quarter 2015, System Energy recorded a revision to its estimated decommissioning cost liability for Grand Gulf as a result of a revised decommissioning cost study.  The revised estimate resulted in a $2.5 million reduction in its decommissioning cost liability, along with a corresponding reduction in the related asset retirement cost asset that will be depreciated over the remaining life of the unit.

In the fourth quarter 2015, Entergy Wholesale Commodities recorded a revision to its estimated decommissioning cost liability for Palisades as a result of a revised decommissioning cost study. The revised estimate resulted in a $42.4 million increase in the decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset. The asset retirement cost asset was included in the Palisades carrying value that was written down to fair value in the fourth quarter 2015. See Note 1 to the financial statements for discussion of the impairment of the value of the Palisades plant.

In 2013, Entergy Wholesale Commodities recorded two revisions to its estimated decommissioning cost liability for Vermont Yankee. In the third quarter 2013, the estimated decommissioning cost liability increased by $58 million, along with a corresponding increase in the related asset retirement cost asset. The increase in the estimated decommissioning cost liability resulted from the change in expectation regarding the timing of decommissioning cash flows due to the decision to cease operations of the plant. The asset retirement cost asset was included in the carrying value used to write down Vermont Yankee and related assets to their fair values in the third quarter 2013. As a result of the settlement agreement regarding the remaining operation and decommissioning of Vermont Yankee, Entergy reassessed its assumptions regarding the timing of decommissioning cash flows. The reassessment resulted in a $27.2 million increase in the decommissioning cost liability and a corresponding impairment charge, recorded in fourth quarter 2013.

In accordance with the settlement agreement, Entergy Vermont Yankee provided to the Vermont parties, in 2014, a site assessment study of the costs and tasks of radiological decommissioning, spent nuclear fuel management, and site restoration for Vermont Yankee.  Entergy Vermont Yankee filed its Post-Shutdown Decommissioning Activities Report (PSDAR) for Vermont Yankee with the NRC in December 2014.  As part of the development of the site assessment study and PSDAR, Entergy obtained a revised decommissioning cost study in the third quarter 2014. The revised estimate, along with reassessment of the assumptions regarding the timing of decommissioning cash flows, resulted in a $101.6 million increase in the decommissioning cost liability and a corresponding impairment charge, recorded in September 2014.

Vermont Yankee submitted notification of permanent cessation of operations and permanent removal of fuel from the reactor in January 2015 after final shutdown in December 2014. Vermont Yankee’s future certifications to satisfy the NRC’s financial assurance requirements will now be based on the site specific cost estimate, including the estimated cost of managing spent fuel, rather than the NRC minimum formula for estimating decommissioning costs. Filings with the NRC for planned shutdown activities will determine whether any other financial assurance may be required and will specifically address funding for spent fuel management, which will be required until the federal government takes possession of the fuel and removes it from the site, per its current obligation.

Entergy expects that amounts available in Vermont Yankee’s decommissioning trust fund, including expected earnings, together with the credit facilities entered into in January 2015 that are expected to be repaid with recoveries from DOE litigation related to spent fuel storage, will be sufficient to cover Vermont Yankee’s expected costs of decommissioning, spent fuel management costs, and site restoration.  In June 2015 the NRC issued an exemption from its regulations to allow Vermont Yankee to use its decommissioning trust fund to pay for approximately $225 million of estimated future spent fuel management costs that will not be paid for using funds from the credit facilities.  In August 2015, Vermont and two Vermont utilities filed a petition in the U.S. Court of Appeals for the D.C. Circuit challenging the NRC’s issuance of that exemption.  If the appeal were to result in a final decision denying Vermont Yankee the exemption allowing the use of its decommissioning trust fund to pay for these spent fuel management costs, Vermont Yankee would have to satisfy the NRC that it had a plan to obtain additional funds to enable it to pay for these costs until the federal government takes possession of the fuel and removes it from the site. See Note 1 to the financial statements for further discussion regarding the Vermont Yankee plant.
In 2014, Entergy Arkansas recorded a revision to its estimated decommissioning cost liabilities for ANO 1 and ANO 2 as a result of a revised decommissioning cost study.  The revised estimates resulted in a $47.6 million increase in the decommissioning cost liabilities, along with a corresponding increase in the related asset retirement cost assets that will be depreciated over the remaining lives of the units.

In the fourth quarter 2014, Entergy Louisiana recorded a revision to its estimated decommissioning cost liability for River Bend as a result of a revised decommissioning cost study. The revised estimate resulted in a $20 million increase in the decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset that will be depreciated over the remaining useful life of the unit.

In the fourth quarter 2014, System Energy recorded a revision to its estimated decommissioning cost liability for Grand Gulf as a result of a revised decommissioning cost study.  The revised estimate resulted in a $99.9 million increase in its decommissioning liability, along with a corresponding increase in the related asset retirement cost asset that will be depreciated over the remaining life of the unit.

For the Indian Point 3 and FitzPatrick plants purchased in 2000, NYPA retained the decommissioning trusts and the decommissioning liabilities.  NYPA and Entergy subsidiaries executed decommissioning agreements, which specify their decommissioning obligations.  NYPA has the right to require the Entergy subsidiaries to assume each of the decommissioning liabilities provided that it assigns the corresponding decommissioning trust, up to a specified level, to the Entergy subsidiaries.  If the decommissioning liabilities are retained by NYPA, the Entergy subsidiaries will perform the decommissioning of the plants at a price equal to the lesser of a pre-specified level or the amount in the decommissioning trusts.  The contract asset represents an estimate of the present value of the difference between the stipulated contract amount for decommissioning the plants less the decommissioning costs estimated in independent decommissioning cost studies. The asset is increased by monthly accretion based on the applicable discount rate necessary to ultimately provide for the estimated future value of the decommissioning contract.  The monthly accretion is recorded as interest income.

In the third quarter 2015, Entergy Wholesale Commodities recorded a revision to the contract asset for the FitzPatrick plant. Due to a change in expectation regarding the timing of decommissioning cash flows, the result was a write down of the contract asset from $335 million to $131 million, for a charge of $204 million. See Note 1 to the financial statements for further discussion of the impairment of the value and planned shutdown of the FitzPatrick plant.

As of December 31, 2015 the contract asset for the Indian Point 3 and FitzPatrick plants is $420.8 million.

Entergy maintains decommissioning trust funds that are committed to meeting its obligations for the costs of decommissioning the nuclear power plants.  The fair values of the decommissioning trust funds and the related asset retirement obligation regulatory assets (liabilities) of Entergy as of December 31, 2015 are as follows:
 
Decommissioning
Trust Fair Values
 
Regulatory
Asset (Liability)
 
(In Millions)
Utility:
 
 
 
ANO 1 and ANO 2

$771.3

 

$280.3

River Bend

$651.7

 

($26.8
)
Waterford 3

$390.6

 

$158.5

Grand Gulf

$701.5

 

$108.6

Entergy Wholesale Commodities

$2,834.9

 

$—


The fair values of the decommissioning trust funds and the related asset retirement obligation regulatory assets (liabilities) of Entergy as of December 31, 2014 are as follows:
 
Decommissioning
Trust Fair Values
 
Regulatory
Asset (Liability)
 
(In Millions)
Utility:
 
 
 
ANO 1 and ANO 2

$769.9

 

$247.6

River Bend

$637.7

 

($25.5
)
Waterford 3

$383.6

 

$145.5

Grand Gulf

$679.8

 

$80.4

Entergy Wholesale Commodities

$2,899.9

 

$—


Coal Combustion Residuals

In June 2010 the EPA issued a proposed rule on coal combustion residuals (CCRs) that contained two primary regulatory options: (1) regulating CCRs destined for disposal in landfills or received (including stored) in surface impoundments as so-called “special wastes” under the hazardous waste program of RCRA Subtitle C; or (2) regulating CCRs destined for disposal in landfills or surface impoundments as non-hazardous wastes under Subtitle D of RCRA.  Under both options, CCRs that are beneficially reused in certain processes would remain excluded from hazardous waste regulation. In April 2015 the EPA published the final CCR rule with the material being regulated under the second scenario presented above - as non-hazardous wastes regulated under RCRA Subtitle D. The final regulations create new compliance requirements including modified storage, new notification and reporting practices, product disposal considerations, and CCR unit closure criteria.  Entergy believes that on-site disposal options will be available at its facilities, to the extent needed for CCR that cannot be transferred for beneficial reuse.
System Energy [Member]  
Asset Retirement Obligations
ASSET RETIREMENT OBLIGATIONS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Accounting standards require companies to record liabilities for all legal obligations associated with the retirement of long-lived assets that result from the normal operation of the assets.  For Entergy, substantially all of its asset retirement obligations consist of its liability for decommissioning its nuclear power plants.  In addition, an insignificant amount of removal costs associated with non-nuclear power plants is also included in the decommissioning line item on the balance sheets.
 
These liabilities are recorded at their fair values (which are the present values of the estimated future cash outflows) in the period in which they are incurred, with an accompanying addition to the recorded cost of the long-lived asset.  The asset retirement obligation is accreted each year through a charge to expense, to reflect the time value of money for this present value obligation.  The accretion will continue through the completion of the asset retirement activity.  The amounts added to the carrying amounts of the long-lived assets will be depreciated over the useful lives of the assets.  The application of accounting standards related to asset retirement obligations is earnings neutral to the rate-regulated business of the Registrant Subsidiaries.

In accordance with ratemaking treatment and as required by regulatory accounting standards, the depreciation provisions for the Registrant Subsidiaries include a component for removal costs that are not asset retirement obligations under accounting standards.  In accordance with regulatory accounting principles, the Registrant Subsidiaries have recorded regulatory assets (liabilities) in the following amounts to reflect their estimates of the difference between estimated incurred removal costs and estimated removal costs recovered in rates:
 
December 31,
 
2015
 
2014
 
(In Millions)
Entergy Arkansas
$85.7
 
$59.0
Entergy Louisiana
($68.3)
 
($82.6)
Entergy Mississippi
$77.5
 
$76.3
Entergy New Orleans
$29.4
 
$35.2
Entergy Texas
$25.8
 
$18.9
System Energy
$54.8
 
$55.7


The cumulative decommissioning and retirement cost liabilities and expenses recorded in 2015 by Entergy were as follows:
 
Liabilities as
of December 31,
2014
 
Liabilities Incurred (a)
 
 
 
Accretion
 
Change in
Cash Flow
Estimate
 
 
 
Spending
 
Liabilities as of December 31, 2015
 
(In Millions)
Utility:
 
 
 
 
 
 
 
 
 
 
 
Entergy Arkansas
$818.4
 

$3.5

 

$50.4

 

$—

 

$—

 

$872.3

Entergy Louisiana
$950.3
 

$1.9

 

$51.0

 

$24.7

 

$—

 

$1,027.9

Entergy Mississippi
$6.8
 

$1.1

 

$0.4

 

$—

 

$—

 

$8.3

Entergy New Orleans
$2.5
 

$—

 

$0.2

 

$—

 

$—

 

$2.7

Entergy Texas
$4.6
 

$1.4

 

$0.3

 

($0.2
)
 

$—

 

$6.1

System Energy
$757.9
 

$—

 

$48.0

 

($2.5
)
 

$—

 

$803.4

Entergy Wholesale Commodities
$1,917.8
 

$—

 

$153.8

 

$99.6

 

($101.7
)
 

$2,069.5


(a)
See “Coal Combustion Residuals” below for additional discussion regarding the asset retirement obligations related to coal combustion residuals management.
The cumulative decommissioning and retirement cost liabilities and expenses recorded in 2014 by Entergy were as follows:
 
Liabilities as
of December 31,
2013
 
 
 
Accretion
 
Change in
Cash Flow
Estimate
 
 
 
Spending
 
Liabilities as
 of December 31,
2014
 
(In Millions)
Utility:
 
 
 
 
 
 
 
 
 
Entergy Arkansas

$723.8

 

$47.0

 

$47.6

 

$—

 

$818.4

Entergy Louisiana

$882.2

 

$48.1

 

$20.0

 

$—

 

$950.3

Entergy Mississippi

$6.4

 

$0.4

 

$—

 

$—

 

$6.8

Entergy New Orleans

$2.3

 

$0.2

 

$—

 

$—

 

$2.5

Entergy Texas

$4.3

 

$0.3

 

$—

 

$—

 

$4.6

System Energy

$616.2

 

$41.8

 

$99.9

 

$—

 

$757.9

Entergy Wholesale Commodities

$1,698.2

 

$139.7

 

$101.6

 

($21.7
)
 

$1,917.8



Nuclear Plant Decommissioning

Entergy periodically reviews and updates estimated decommissioning costs.  The actual decommissioning costs may vary from the estimates because of regulatory requirements, changes in technology, and increased costs of labor, materials, and equipment.  As described below, during 2015 and 2014 Entergy updated decommissioning cost estimates for certain nuclear power plants.

In the second quarter 2015, Entergy Wholesale Commodities recorded a revision to its estimated decommissioning cost liability for a nuclear site as a result of a revised decommissioning cost study. The revised estimate resulted in a $77.6 million reduction in the decommissioning cost liability, along with a corresponding reduction in the related asset retirement cost asset.

In the third quarter 2015, Entergy Wholesale Commodities recorded a revision to its estimated decommissioning cost liability for Pilgrim as a result of a revised decommissioning cost study. The revised estimate resulted in a $134 million increase in the decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset. The increase in the estimated decommissioning cost liability resulted from the change in expectation regarding the timing of decommissioning cash flows due to the decision to cease operations of the plant no later than June 2019. The asset retirement cost asset was included in the Pilgrim carrying value that was written down to fair value in the third quarter 2015. See Note 1 to the financial statements for discussion of the impairment of the value and planned shutdown of the Pilgrim plant.

After shutdown, Pilgrim will transition to decommissioning. The Pilgrim nuclear decommissioning trust had a balance of approximately $896 million as of December 31, 2015, representing excess financial assurance of approximately $270 million for license termination activities above NRC-required assurance levels. Filings with the NRC for planned shutdown activities will determine whether any other financial assurance may be required and will specifically address funding for spent fuel management, which will be required until the federal government takes possession of the fuel and removes it from the site, per its current obligation. No additional funding is anticipated at this time.

In the fourth quarter 2015, Entergy Louisiana recorded a revision to its estimated decommissioning cost liability for Waterford 3 as a result of a revised decommissioning cost study.  The revised estimate resulted in a $24.9 million increase in its decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset that will be depreciated over the remaining life of the unit.

In the fourth quarter 2015, System Energy recorded a revision to its estimated decommissioning cost liability for Grand Gulf as a result of a revised decommissioning cost study.  The revised estimate resulted in a $2.5 million reduction in its decommissioning cost liability, along with a corresponding reduction in the related asset retirement cost asset that will be depreciated over the remaining life of the unit.

In the fourth quarter 2015, Entergy Wholesale Commodities recorded a revision to its estimated decommissioning cost liability for Palisades as a result of a revised decommissioning cost study. The revised estimate resulted in a $42.4 million increase in the decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset. The asset retirement cost asset was included in the Palisades carrying value that was written down to fair value in the fourth quarter 2015. See Note 1 to the financial statements for discussion of the impairment of the value of the Palisades plant.

In 2013, Entergy Wholesale Commodities recorded two revisions to its estimated decommissioning cost liability for Vermont Yankee. In the third quarter 2013, the estimated decommissioning cost liability increased by $58 million, along with a corresponding increase in the related asset retirement cost asset. The increase in the estimated decommissioning cost liability resulted from the change in expectation regarding the timing of decommissioning cash flows due to the decision to cease operations of the plant. The asset retirement cost asset was included in the carrying value used to write down Vermont Yankee and related assets to their fair values in the third quarter 2013. As a result of the settlement agreement regarding the remaining operation and decommissioning of Vermont Yankee, Entergy reassessed its assumptions regarding the timing of decommissioning cash flows. The reassessment resulted in a $27.2 million increase in the decommissioning cost liability and a corresponding impairment charge, recorded in fourth quarter 2013.

In accordance with the settlement agreement, Entergy Vermont Yankee provided to the Vermont parties, in 2014, a site assessment study of the costs and tasks of radiological decommissioning, spent nuclear fuel management, and site restoration for Vermont Yankee.  Entergy Vermont Yankee filed its Post-Shutdown Decommissioning Activities Report (PSDAR) for Vermont Yankee with the NRC in December 2014.  As part of the development of the site assessment study and PSDAR, Entergy obtained a revised decommissioning cost study in the third quarter 2014. The revised estimate, along with reassessment of the assumptions regarding the timing of decommissioning cash flows, resulted in a $101.6 million increase in the decommissioning cost liability and a corresponding impairment charge, recorded in September 2014.

Vermont Yankee submitted notification of permanent cessation of operations and permanent removal of fuel from the reactor in January 2015 after final shutdown in December 2014. Vermont Yankee’s future certifications to satisfy the NRC’s financial assurance requirements will now be based on the site specific cost estimate, including the estimated cost of managing spent fuel, rather than the NRC minimum formula for estimating decommissioning costs. Filings with the NRC for planned shutdown activities will determine whether any other financial assurance may be required and will specifically address funding for spent fuel management, which will be required until the federal government takes possession of the fuel and removes it from the site, per its current obligation.

Entergy expects that amounts available in Vermont Yankee’s decommissioning trust fund, including expected earnings, together with the credit facilities entered into in January 2015 that are expected to be repaid with recoveries from DOE litigation related to spent fuel storage, will be sufficient to cover Vermont Yankee’s expected costs of decommissioning, spent fuel management costs, and site restoration.  In June 2015 the NRC issued an exemption from its regulations to allow Vermont Yankee to use its decommissioning trust fund to pay for approximately $225 million of estimated future spent fuel management costs that will not be paid for using funds from the credit facilities.  In August 2015, Vermont and two Vermont utilities filed a petition in the U.S. Court of Appeals for the D.C. Circuit challenging the NRC’s issuance of that exemption.  If the appeal were to result in a final decision denying Vermont Yankee the exemption allowing the use of its decommissioning trust fund to pay for these spent fuel management costs, Vermont Yankee would have to satisfy the NRC that it had a plan to obtain additional funds to enable it to pay for these costs until the federal government takes possession of the fuel and removes it from the site. See Note 1 to the financial statements for further discussion regarding the Vermont Yankee plant.
In 2014, Entergy Arkansas recorded a revision to its estimated decommissioning cost liabilities for ANO 1 and ANO 2 as a result of a revised decommissioning cost study.  The revised estimates resulted in a $47.6 million increase in the decommissioning cost liabilities, along with a corresponding increase in the related asset retirement cost assets that will be depreciated over the remaining lives of the units.

In the fourth quarter 2014, Entergy Louisiana recorded a revision to its estimated decommissioning cost liability for River Bend as a result of a revised decommissioning cost study. The revised estimate resulted in a $20 million increase in the decommissioning cost liability, along with a corresponding increase in the related asset retirement cost asset that will be depreciated over the remaining useful life of the unit.

In the fourth quarter 2014, System Energy recorded a revision to its estimated decommissioning cost liability for Grand Gulf as a result of a revised decommissioning cost study.  The revised estimate resulted in a $99.9 million increase in its decommissioning liability, along with a corresponding increase in the related asset retirement cost asset that will be depreciated over the remaining life of the unit.

For the Indian Point 3 and FitzPatrick plants purchased in 2000, NYPA retained the decommissioning trusts and the decommissioning liabilities.  NYPA and Entergy subsidiaries executed decommissioning agreements, which specify their decommissioning obligations.  NYPA has the right to require the Entergy subsidiaries to assume each of the decommissioning liabilities provided that it assigns the corresponding decommissioning trust, up to a specified level, to the Entergy subsidiaries.  If the decommissioning liabilities are retained by NYPA, the Entergy subsidiaries will perform the decommissioning of the plants at a price equal to the lesser of a pre-specified level or the amount in the decommissioning trusts.  The contract asset represents an estimate of the present value of the difference between the stipulated contract amount for decommissioning the plants less the decommissioning costs estimated in independent decommissioning cost studies. The asset is increased by monthly accretion based on the applicable discount rate necessary to ultimately provide for the estimated future value of the decommissioning contract.  The monthly accretion is recorded as interest income.

In the third quarter 2015, Entergy Wholesale Commodities recorded a revision to the contract asset for the FitzPatrick plant. Due to a change in expectation regarding the timing of decommissioning cash flows, the result was a write down of the contract asset from $335 million to $131 million, for a charge of $204 million. See Note 1 to the financial statements for further discussion of the impairment of the value and planned shutdown of the FitzPatrick plant.

As of December 31, 2015 the contract asset for the Indian Point 3 and FitzPatrick plants is $420.8 million.

Entergy maintains decommissioning trust funds that are committed to meeting its obligations for the costs of decommissioning the nuclear power plants.  The fair values of the decommissioning trust funds and the related asset retirement obligation regulatory assets (liabilities) of Entergy as of December 31, 2015 are as follows:
 
Decommissioning
Trust Fair Values
 
Regulatory
Asset (Liability)
 
(In Millions)
Utility:
 
 
 
ANO 1 and ANO 2

$771.3

 

$280.3

River Bend

$651.7

 

($26.8
)
Waterford 3

$390.6

 

$158.5

Grand Gulf

$701.5

 

$108.6

Entergy Wholesale Commodities

$2,834.9

 

$—


The fair values of the decommissioning trust funds and the related asset retirement obligation regulatory assets (liabilities) of Entergy as of December 31, 2014 are as follows:
 
Decommissioning
Trust Fair Values
 
Regulatory
Asset (Liability)
 
(In Millions)
Utility:
 
 
 
ANO 1 and ANO 2

$769.9

 

$247.6

River Bend

$637.7

 

($25.5
)
Waterford 3

$383.6

 

$145.5

Grand Gulf

$679.8

 

$80.4

Entergy Wholesale Commodities

$2,899.9

 

$—


Coal Combustion Residuals

In June 2010 the EPA issued a proposed rule on coal combustion residuals (CCRs) that contained two primary regulatory options: (1) regulating CCRs destined for disposal in landfills or received (including stored) in surface impoundments as so-called “special wastes” under the hazardous waste program of RCRA Subtitle C; or (2) regulating CCRs destined for disposal in landfills or surface impoundments as non-hazardous wastes under Subtitle D of RCRA.  Under both options, CCRs that are beneficially reused in certain processes would remain excluded from hazardous waste regulation. In April 2015 the EPA published the final CCR rule with the material being regulated under the second scenario presented above - as non-hazardous wastes regulated under RCRA Subtitle D. The final regulations create new compliance requirements including modified storage, new notification and reporting practices, product disposal considerations, and CCR unit closure criteria.  Entergy believes that on-site disposal options will be available at its facilities, to the extent needed for CCR that cannot be transferred for beneficial reuse.