DEFERRED ENGINEERING COSTS
12 Months Ended
Dec. 31, 2022
Deferred Costs [Abstract]  
DEFERRED ENGINEERING COSTS
NOTE 5 — DEFERRED ENGINEERING COSTS
Deferred engineering costs related to the planned construction of the Driftwood terminal were transferred to construction in progress upon issuing the LNTP to Bechtel in March 2022. See Note 4, Property, Plant and Equipment, for further information.