XML 33 R23.htm IDEA: XBRL DOCUMENT v3.24.0.1
Contingencies and Commitments
12 Months Ended
Dec. 31, 2023
Commitments and Contingencies Disclosure [Abstract]  
Contingencies and Commitments

(14) Contingencies and Commitments

In 2009, the Company was named by the Environmental Protection Agency (the “EPA”) as a Potentially Responsible Party (“PRP”) in addition to a group of approximately 250 named PRPs under the Comprehensive Environmental Response, Compensation and Liability Act of 1981 (“CERCLA”) with respect to a Superfund site, the Portland Harbor Superfund site (“Portland Harbor”) in Portland, Oregon. The site was declared a Superfund site in December 2000 as a result of historical heavily industrialized use due to manufacturing, shipbuilding, petroleum storage and distribution, metals salvaging, and electrical power generation activities which led to contamination of Portland Harbor, an urban and industrial reach of the lower Willamette River located immediately downstream of downtown Portland. The Company’s involvement arises from four spills at the site after it was declared a Superfund site, as a result of predecessor entities’ actions in the area. To date, there is no information suggesting the extent of the costs or damages to be claimed from the 250 notified PRPs. Based on the nature of the involvement at the Portland Harbor site, the Company believes its potential contribution is de minimis; however, to date neither the EPA nor the named PRPs have performed an allocation of potential liability in connection with the site nor have they provided costs and expenses in connection with the site.

On February 20, 2015, the Company was served as a defendant in a Complaint originally filed on August 14, 2014, in the U.S. District Court of the Southern District of Texas - Houston Division, USOR Site PRP Group vs. A&M Contractors, USES, Inc. et al. This is a civil action pursuant to the provisions of CERCLA and the Texas Solid Waste Disposal Act for recovery of past and future response costs incurred and to be incurred by the USOR Site PRP Group for response activities at the U.S. Oil Recovery Superfund Site. The property was a former sewage treatment plant owned by defendant City of Pasadena, Texas from approximately 1945 until it was acquired by U.S. Oil Recovery in January 2009. Throughout its operating life, the U.S. Oil Recovery facility portion of the USOR Site received and performed wastewater pretreatment of municipal and Industrial Class I and Class II wastewater, characteristically hazardous waste, used oil and oily sludges, and municipal solid waste. Associated operations were conducted at the MCC Recycling facility portion of the USOR Site after it was acquired by U.S. Oil Recovery from the City of Pasadena in January 2009. The EPA and the PRP Group entered into an Administrative Settlement Agreement and Order for Remedial Investigation Study (“Study”) in May 2015. The Study has not been completed by EPA to date. The Company joined as a member of the PRP Group companies at its pro-rata allocated share.

On October 13, 2016, the Company, as a successor to Hollywood Marine, Inc. (“Hollywood Marine”), was issued a General Notice under CERCLA by the EPA in which it was named as a PRP for liabilities associated with the SBA Shipyard Site located near Jennings, Louisiana (the “Site”). The Site was added to the EPA’s National Priorities List of sites under CERCLA in September 2016. SBA used the facility for construction, repair, retrofitting, sandblasting, and cleaning and painting of barges beginning in 1965. Three barge slips and a dry dock are located off the Mermentau River. The slips were used to dock barges during cleaning or repair. In 2001, a group of PRPs that had been former customers of the SBA Shipyard facility formed an organization called the SSIC Remediation, LLC (hereinafter, “the PRP Group Companies”) to address removal actions at the Site. In 2002, EPA approved an Interim Measures/Removal Action of Hazardous/Principal Threat Wastes at SBA Shipyards, Inc. (pursuant to RCRA Section 3008(h)) that was proposed by SBA Shipyard and the PRP Group Companies. Interim removal activities were conducted from March 2001 through January 2005 under an EPA 2002 Order and Agreement. In September 2012, the Louisiana Department of Environmental Quality requested EPA address the Site under CERCLA authority. The Company, as a successor to Hollywood Marine, joined the PRP Group Companies. The PRP Group Companies have submitted a draft Study work plan to EPA for their review and comment. Higman was named as a PRP in connection with its activities at the Site. Higman is not a participant in the PRP Group Companies.

With respect to the above sites, the Company has accrued a liability, if applicable, for its estimated potential liability for its portion of the EPA’s past costs claim based on information developed to date including various factors such as the Company’s liability in proportion to other PRPs and the extent to which such costs are recoverable from third parties.

On October 13, 2016, the tug Nathan E. Stewart and barge DBL 55, an ATB owned and operated by Kirby Offshore Marine, LLC, a wholly owned subsidiary of the Company, ran aground at the entrance to Seaforth Channel on Atholone Island, British Columbia. The grounding resulted in a breach of a portion of the Nathan E. Stewart’s fuel tanks causing a discharge of diesel fuel into the water. The USCG and the NTSB designated the Company as a party of interest in their investigation as to the cause of the incident. The Canadian authorities including Transport Canada and the Canadian Transportation Safety Board investigated the cause of the incident. On October 10, 2018, the Heiltsuk First Nation filed a civil action in the British Columbia Supreme Court against a subsidiary of the Company, the master and pilot of the tug, the vessels and the Canadian government seeking unquantified damages as a result of the incident. On May 1, 2019, the Company filed a limitation action in the Federal Court of Canada seeking limitation of liability relating to the incident as provided under admiralty law. The Heiltsuk First Nation’s civil claim has been consolidated into the Federal Court limitation action as of July 26, 2019 and it is expected that the Federal Court of Canada will decide all claims against the Company. The Company is unable to estimate the potential exposure in the civil proceeding. The Company has various insurance policies covering liabilities including pollution, property, marine and general liability and believes that it has satisfactory insurance coverage for the cost of cleanup and salvage operations as well as other potential liabilities arising from the incident. The Company believes its accrual of such estimated liability is adequate for the incident and does not expect the incident to have a material adverse effect on its business or financial condition.

In addition, the Company is involved in various legal and other proceedings which are incidental to the conduct of its business, none of which in the opinion of management will have a material effect on the Company’s financial condition, results of operations or cash flows. Management believes its accrual of such estimated liability is adequate and believes that it has adequate insurance coverage or has meritorious defenses for these other claims and contingencies.

Certain Significant Risks and Uncertainties. The preparation of financial statements in conformity with United States generally accepted accounting principles requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the financial statements, and the reported amounts of revenues and expenses during the reporting period. Actual results could differ from those estimates. However, in the opinion of management, the amounts would be immaterial.

The Company has issued guaranties or obtained standby letters of credit and performance bonds supporting performance by the Company and its subsidiaries of contractual or contingent legal obligations of the Company and its subsidiaries incurred in the ordinary course of business. The aggregate notional value of these instruments is $26.7 million at December 31, 2023, including $12.1 million in letters of credit and $14.6 million in performance bonds. All of these instruments have an expiration date within two years. The Company does not believe demand for payment under these instruments is likely and expects no material cash outlays to occur in connection with these instruments.