XML 60 R46.htm IDEA: XBRL DOCUMENT v3.22.4
REAL ESTATE PROPERTIES - Development and Value-Add Disclosures (Details)
12 Months Ended
Dec. 31, 2022
USD ($)
ft²
Dec. 31, 2021
USD ($)
ft²
Dec. 31, 2020
USD ($)
Real Estate [Line Items]      
Interest costs capitalized on development properties $ 12,393,000 $ 9,028,000 $ 9,651,000
Internal Development Costs Capitalized During Period 9,985,000 7,713,000 6,689,000
Costs subsequent to transfer, development transfers during the period 10,989,000    
Development costs incurred, for the period $ 494,073,000 $ 418,855,000 $ 195,446,000
Speed Distribution Center      
Real Estate [Line Items]      
Area of real estate property | ft²   519,000  
Lease Up [Member]      
Real Estate [Line Items]      
Area of real estate property | ft² 1,415,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 133,260,000    
Development and value-add properties 158,945,000    
Estimated Total Cumulative Development Costs [2] $ 173,600,000    
Lease Up [Member] | Cypress Preserve 1 & 2      
Real Estate [Line Items]      
Area of real estate property | ft² [3] 516,000    
Costs Transferred In Current Year [1],[3] $ 0    
Development costs incurred, for the period [3] 54,081,000    
Development and value-add properties [3] 54,081,000    
Estimated Total Cumulative Development Costs [2],[3] $ 57,800,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) [3] 03/23    
Lease Up [Member] | Grand West Crossing 1      
Real Estate [Line Items]      
Area of real estate property | ft² 121,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 4,168,000    
Development and value-add properties 13,037,000    
Estimated Total Cumulative Development Costs [2] $ 15,700,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 04/23    
Lease Up [Member] | Zephyr Distribution Center      
Real Estate [Line Items]      
Area of real estate property | ft² [3] 82,000    
Costs Transferred In Current Year [1],[3] $ 0    
Development costs incurred, for the period [3] 29,028,000    
Development and value-add properties [3] 29,028,000    
Estimated Total Cumulative Development Costs [2],[3] $ 29,800,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) [3] 04/23    
Lease Up [Member] | Access Point 3      
Real Estate [Line Items]      
Area of real estate property | ft² [3] 299,000    
Costs Transferred In Current Year [1],[3] $ 0    
Development costs incurred, for the period [3] 22,632,000    
Development and value-add properties [3] 22,632,000    
Estimated Total Cumulative Development Costs [2],[3] $ 25,400,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) [3] 07/23    
Lease Up [Member] | McKinney 3 & 4      
Real Estate [Line Items]      
Area of real estate property | ft² 212,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 13,714,000    
Development and value-add properties 24,152,000    
Estimated Total Cumulative Development Costs [2] $ 27,000,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 07/23    
Lease Up [Member] | Grand Oaks 75 4      
Real Estate [Line Items]      
Area of real estate property | ft² 185,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 9,637,000    
Development and value-add properties 16,015,000    
Estimated Total Cumulative Development Costs [2] $ 17,900,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 09/23    
Under construction [Member]      
Real Estate [Line Items]      
Area of real estate property | ft² 2,566,000    
Costs Transferred In Current Year [1] $ 52,687,000    
Development costs incurred, for the period 102,297,000    
Development and value-add properties 165,886,000    
Estimated Total Cumulative Development Costs [2] $ 320,500,000    
Under construction [Member] | Suncoast 11      
Real Estate [Line Items]      
Area of real estate property | ft² 79,000    
Costs Transferred In Current Year [1] $ 1,524,000    
Development costs incurred, for the period 7,651,000    
Development and value-add properties 9,175,000    
Estimated Total Cumulative Development Costs [2] $ 9,900,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 04/23    
Under construction [Member] | Arlington Tech 3      
Real Estate [Line Items]      
Area of real estate property | ft² 77,000    
Costs Transferred In Current Year [1] $ 1,980,000    
Development costs incurred, for the period 6,420,000    
Development and value-add properties 8,400,000    
Estimated Total Cumulative Development Costs [2] $ 10,300,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 02/24    
Under construction [Member] | Gateway 2      
Real Estate [Line Items]      
Area of real estate property | ft² 133,000    
Costs Transferred In Current Year [1] $ 8,049,000    
Development costs incurred, for the period 10,139,000    
Development and value-add properties 18,188,000    
Estimated Total Cumulative Development Costs [2] $ 23,700,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 02/24    
Under construction [Member] | Hillside 1      
Real Estate [Line Items]      
Area of real estate property | ft² 122,000    
Costs Transferred In Current Year [1] $ 632,000    
Development costs incurred, for the period 8,846,000    
Development and value-add properties 9,478,000    
Estimated Total Cumulative Development Costs [2] $ 11,600,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 02/24    
Under construction [Member] | I-20 West Business Center      
Real Estate [Line Items]      
Area of real estate property | ft² 155,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 10,175,000    
Development and value-add properties 13,139,000    
Estimated Total Cumulative Development Costs [2] $ 15,500,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 02/24    
Under construction [Member] | Lakeport 4 & 5      
Real Estate [Line Items]      
Area of real estate property | ft² 177,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 10,767,000    
Development and value-add properties 18,705,000    
Estimated Total Cumulative Development Costs [2] $ 24,000,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 02/24    
Under construction [Member] | Horizon West 1      
Real Estate [Line Items]      
Area of real estate property | ft² 97,000    
Costs Transferred In Current Year [1] $ 3,730,000    
Development costs incurred, for the period 5,839,000    
Development and value-add properties 9,569,000    
Estimated Total Cumulative Development Costs [2] $ 13,200,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 03/24    
Under construction [Member] | Steel Creek 11 & 12      
Real Estate [Line Items]      
Area of real estate property | ft² 241,000    
Costs Transferred In Current Year [1] $ 2,857,000    
Development costs incurred, for the period 13,923,000    
Development and value-add properties 16,780,000    
Estimated Total Cumulative Development Costs [2] $ 25,900,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 04/24    
Under construction [Member] | Springwood 1 & 2      
Real Estate [Line Items]      
Area of real estate property | ft² 292,000    
Costs Transferred In Current Year [1] $ 6,741,000    
Development costs incurred, for the period 16,232,000    
Development and value-add properties 22,973,000    
Estimated Total Cumulative Development Costs [2] $ 33,300,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 05/24    
Under construction [Member] | Stonefield 35 1-3      
Real Estate [Line Items]      
Area of real estate property | ft² 274,000    
Costs Transferred In Current Year [1] $ 10,279,000    
Development costs incurred, for the period 6,040,000    
Development and value-add properties 16,319,000    
Estimated Total Cumulative Development Costs [2] $ 35,300,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 06/24    
Under construction [Member] | SunCoast 10      
Real Estate [Line Items]      
Area of real estate property | ft² 100,000    
Costs Transferred In Current Year [1] $ 1,624,000    
Development costs incurred, for the period 1,344,000    
Development and value-add properties 2,968,000    
Estimated Total Cumulative Development Costs [2] $ 13,600,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 06/24    
Under construction [Member] | Basswood 3-5      
Real Estate [Line Items]      
Area of real estate property | ft² 351,000    
Costs Transferred In Current Year [1] $ 7,476,000    
Development costs incurred, for the period 886,000    
Development and value-add properties 8,362,000    
Estimated Total Cumulative Development Costs [2] $ 45,000,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 08/24    
Under construction [Member] | McKinney 1 & 2      
Real Estate [Line Items]      
Area of real estate property | ft² 172,000    
Costs Transferred In Current Year [1] $ 4,261,000    
Development costs incurred, for the period 2,240,000    
Development and value-add properties 6,501,000    
Estimated Total Cumulative Development Costs [2] $ 27,300,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 08/24    
Under construction [Member] | Cass White 1 & 2      
Real Estate [Line Items]      
Area of real estate property | ft² 296,000    
Costs Transferred In Current Year [1] $ 3,534,000    
Development costs incurred, for the period 1,795,000    
Development and value-add properties 5,329,000    
Estimated Total Cumulative Development Costs [2] $ 31,900,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 10/24    
Prospective Development [Member]      
Real Estate [Line Items]      
Area of real estate property | ft² 9,730,000    
Costs Transferred In Current Year [1] $ (63,369,000)    
Development costs incurred, for the period 148,984,000    
Development and value-add properties $ 213,618,000    
Prospective Development [Member] | Phoenix [Member]      
Real Estate [Line Items]      
Area of real estate property | ft² 655,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 15,395,000    
Development and value-add properties $ 15,395,000    
Prospective Development [Member] | Sacramento      
Real Estate [Line Items]      
Area of real estate property | ft² 82,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 3,130,000    
Development and value-add properties $ 3,130,000    
Prospective Development [Member] | San Francisco      
Real Estate [Line Items]      
Area of real estate property | ft² 65,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 3,561,000    
Development and value-add properties $ 3,561,000    
Prospective Development [Member] | Fort Myers [Member]      
Real Estate [Line Items]      
Area of real estate property | ft² 364,000    
Costs Transferred In Current Year [1] $ (3,148,000)    
Development costs incurred, for the period 2,693,000    
Development and value-add properties $ 7,843,000    
Prospective Development [Member] | Miami [Member]      
Real Estate [Line Items]      
Area of real estate property | ft² 510,000    
Costs Transferred In Current Year [1] $ (8,049,000)    
Development costs incurred, for the period 18,035,000    
Development and value-add properties $ 24,317,000    
Prospective Development [Member] | Orlando [Member]      
Real Estate [Line Items]      
Area of real estate property | ft² 1,053,000    
Costs Transferred In Current Year [1] $ (9,906,000)    
Development costs incurred, for the period 8,338,000    
Development and value-add properties $ 24,670,000    
Prospective Development [Member] | Tampa [Member]      
Real Estate [Line Items]      
Area of real estate property | ft² 32,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 0    
Development and value-add properties $ 825,000    
Prospective Development [Member] | Atlanta [Member]      
Real Estate [Line Items]      
Area of real estate property | ft² 1,490,000    
Costs Transferred In Current Year [1] $ (3,534,000)    
Development costs incurred, for the period 13,189,000    
Development and value-add properties $ 14,713,000    
Prospective Development [Member] | Jackson [Member]      
Real Estate [Line Items]      
Area of real estate property | ft² 28,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 0    
Development and value-add properties $ 706,000    
Prospective Development [Member] | Charlotte [Member]      
Real Estate [Line Items]      
Area of real estate property | ft² 1,146,000    
Costs Transferred In Current Year [1] $ (2,857,000)    
Development costs incurred, for the period 1,475,000    
Development and value-add properties $ 13,722,000    
Prospective Development [Member] | Greenville [Member]      
Real Estate [Line Items]      
Area of real estate property | ft² 476,000    
Costs Transferred In Current Year [1] $ (632,000)    
Development costs incurred, for the period 5,353,000    
Development and value-add properties $ 6,457,000    
Prospective Development [Member] | Austin [Member]      
Real Estate [Line Items]      
Area of real estate property | ft² 1,557,000    
Costs Transferred In Current Year [1] $ (10,279,000)    
Development costs incurred, for the period 50,699,000    
Development and value-add properties $ 46,851,000    
Prospective Development [Member] | Dallas [Member]      
Real Estate [Line Items]      
Area of real estate property | ft² 0    
Costs Transferred In Current Year [1] $ (4,261,000)    
Development costs incurred, for the period 457,000    
Development and value-add properties $ 4,594,000    
Prospective Development [Member] | Houston [Member]      
Real Estate [Line Items]      
Area of real estate property | ft² 1,536,000    
Costs Transferred In Current Year [1] $ (11,247,000)    
Development costs incurred, for the period 17,110,000    
Development and value-add properties $ 30,696,000    
Prospective Development [Member] | San Antonio [Member]      
Real Estate [Line Items]      
Area of real estate property | ft² 423,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 8,173,000    
Development and value-add properties $ 8,891,000    
Prospective Development [Member] | Fort Worth      
Real Estate [Line Items]      
Area of real estate property | ft² 313,000    
Costs Transferred In Current Year [1] $ (9,456,000)    
Development costs incurred, for the period 1,376,000    
Development and value-add properties $ 7,247,000    
Lease Up, Construction, And Prospective Development [Member]      
Real Estate [Line Items]      
Area of real estate property | ft² 13,711,000    
Costs Transferred In Current Year [1] $ (10,682,000)    
Development costs incurred, for the period 384,541,000    
Development and value-add properties 538,449,000    
Development obligations 134,800,000    
Tenant improvement obligations $ 15,000,000    
Development completed and transferred to Real estate properties [Member]      
Real Estate [Line Items]      
Area of real estate property | ft² 3,638,000    
Costs Transferred In Current Year [1] $ 10,682,000    
Development costs incurred, for the period 110,623,000    
Development and value-add properties [4] $ 461,329,000    
Development completed and transferred to Real estate properties [Member] | SunCoast Commerce Center 12      
Real Estate [Line Items]      
Area of real estate property | ft² 79,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 3,928,000    
Development and value-add properties [4] $ 8,106,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 12/22    
Development completed and transferred to Real estate properties [Member] | Tri-County Crossing 5      
Real Estate [Line Items]      
Area of real estate property | ft² 106,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 5,544,000    
Development and value-add properties [4] $ 11,144,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 12/22    
Development completed and transferred to Real estate properties [Member] | Access Point 1      
Real Estate [Line Items]      
Area of real estate property | ft² [3] 156,000    
Costs Transferred In Current Year [1],[3] $ 0    
Development costs incurred, for the period [3] 7,000    
Development and value-add properties [3],[4] $ 12,529,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) [3] 01/22    
Development completed and transferred to Real estate properties [Member] | Speed Distribution Center      
Real Estate [Line Items]      
Area of real estate property | ft² 519,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 2,884,000    
Development and value-add properties [4] $ 70,702,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 03/22    
Development completed and transferred to Real estate properties [Member] | Access Point 2      
Real Estate [Line Items]      
Area of real estate property | ft² [3] 159,000    
Costs Transferred In Current Year [1],[3] $ 0    
Development costs incurred, for the period [3] 601,000    
Development and value-add properties [3],[4] $ 12,232,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) [3] 05/22    
Development completed and transferred to Real estate properties [Member] | Grand Oaks 75 Business Center 3      
Real Estate [Line Items]      
Area of real estate property | ft² 136,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 1,205,000    
Development and value-add properties [4] $ 11,397,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 06/22    
Development completed and transferred to Real estate properties [Member] | Siempre Viva 3-6      
Real Estate [Line Items]      
Area of real estate property | ft² [3] 547,000    
Costs Transferred In Current Year [1],[3] $ 0    
Development costs incurred, for the period [3] 595,000    
Development and value-add properties [3],[4] $ 133,283,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) [3] 06/22    
Development completed and transferred to Real estate properties [Member] | Steele Creek 8      
Real Estate [Line Items]      
Area of real estate property | ft² 72,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 5,142,000    
Development and value-add properties [4] $ 7,870,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 07/22    
Development completed and transferred to Real estate properties [Member] | CreekView 9 & 10      
Real Estate [Line Items]      
Area of real estate property | ft² 145,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 4,210,000    
Development and value-add properties [4] $ 15,546,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 08/22    
Development completed and transferred to Real estate properties [Member] | Gateway Commerce Park 3      
Real Estate [Line Items]      
Area of real estate property | ft² 133,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 4,903,000    
Development and value-add properties [4] $ 18,069,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 08/22    
Development completed and transferred to Real estate properties [Member] | Ridgeview 3      
Real Estate [Line Items]      
Area of real estate property | ft² 88,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 3,513,000    
Development and value-add properties [4] $ 9,317,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 08/22    
Development completed and transferred to Real estate properties [Member] | Americas Ten 2      
Real Estate [Line Items]      
Area of real estate property | ft² 169,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 5,254,000    
Development and value-add properties [4] $ 14,354,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 09/22    
Development completed and transferred to Real estate properties [Member] | Horizon West 2 & 3      
Real Estate [Line Items]      
Area of real estate property | ft² 210,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 1,597,000    
Development and value-add properties [4] $ 18,787,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 09/22    
Development completed and transferred to Real estate properties [Member] | Mesa Gateway Commerce Center      
Real Estate [Line Items]      
Area of real estate property | ft² [3] 147,000    
Costs Transferred In Current Year [1],[3] $ 0    
Development costs incurred, for the period [3] 18,696,000    
Development and value-add properties [3],[4] $ 18,696,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) [3] 11/22    
Development completed and transferred to Real estate properties [Member] | World Houston 47      
Real Estate [Line Items]      
Area of real estate property | ft² 139,000    
Costs Transferred In Current Year [1] $ 4,506,000    
Development costs incurred, for the period 12,517,000    
Development and value-add properties [4] $ 17,023,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 11/22    
Development completed and transferred to Real estate properties [Member] | 45 Crossing      
Real Estate [Line Items]      
Area of real estate property | ft² 177,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 7,998,000    
Development and value-add properties [4] $ 25,058,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 12/22    
Development completed and transferred to Real estate properties [Member] | Basswood 1 & 2      
Real Estate [Line Items]      
Area of real estate property | ft² 237,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 7,237,000    
Development and value-add properties [4] $ 22,466,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 12/22    
Development completed and transferred to Real estate properties [Member] | Horizon West 4      
Real Estate [Line Items]      
Area of real estate property | ft² 295,000    
Costs Transferred In Current Year [1] $ 6,176,000    
Development costs incurred, for the period 18,201,000    
Development and value-add properties [4] $ 24,377,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 12/22    
Development completed and transferred to Real estate properties [Member] | Tri-County Crossing 6      
Real Estate [Line Items]      
Area of real estate property | ft² 124,000    
Costs Transferred In Current Year [1] $ 0    
Development costs incurred, for the period 6,591,000    
Development and value-add properties [4] $ 10,373,000    
Conversion date (or anticipated conversion date, if property is in lease-up or under construction) 12/22    
Lease-Up and Under Construction      
Real Estate [Line Items]      
Area of real estate property | ft² 3,981,000    
Costs Transferred In Current Year [1] $ 52,687,000    
Development costs incurred, for the period 235,557,000    
Development and value-add properties 324,831,000    
Estimated Total Cumulative Development Costs [2] $ 494,100,000    
[1] Represents costs transferred from Prospective Development (primarily land) to Under Construction during the period. Negative amounts represent land inventory costs transferred to Under Construction.
[2] Included in these costs are development obligations of $134.8 million and tenant improvement obligations of $15.0 million on properties under development.
[3] Represents value-add acquisitions.
[4] Represents cumulative costs at the date of transfer.