Regulatory assets and liabilities.  In accordance with ASC Topic 980, “Regulated Operations,” the Utilities’ financial statements reflect assets, liabilities, revenues and expenses based on current cost-based rate-making regulations. Their continued accounting under ASC Topic 980 generally requires that rates are established by an independent, third-party regulator; rates are designed to recover the costs of providing service; and it is reasonable to assume that rates can be charged to and collected from customers. Management believes the Utilities’ operations currently satisfy the ASC Topic 980 criteria. If events or circumstances should change so that those criteria are no longer satisfied, the Utilities expect that the regulatory assets, net of regulatory liabilities, would be charged to the statement of income in the period of discontinuance, which may result in a material adverse effect on the Company’s and the Utilities' financial condition, results of operations and/or liquidity.
Regulatory assets represent deferred costs expected to be fully recovered through rates over PUC-authorized periods. Generally, the Utilities do not earn a return on their regulatory assets; however, they have been allowed to recover interest on certain regulatory assets and to include certain regulatory assets in rate base. Regulatory liabilities represent amounts included in rates and collected from ratepayers for costs expected to be incurred in the future. For example, the regulatory liability for cost of removal in excess of salvage value represents amounts that have been collected from ratepayers for costs that are expected to be incurred in the future to retire utility plant. Generally, the Utilities include regulatory liabilities in rate base or are required to apply interest to certain regulatory liabilities. In the table below, noted in parentheses are the original PUC authorized amortization or recovery periods and, if different, the remaining amortization or recovery periods as of December 31, 2015 are noted.
Regulatory assets were as follows:
December 31
2015

 
2014

(in thousands)
 

 
 

Retirement benefit plans (balance primarily varies with plans’ funded statuses)
$
679,766

 
$
683,243

Income taxes, net (1 to 55 years)
88,039

 
86,836

Decoupling revenue balancing account and RAM regulatory asset (1 to 2 years)
74,462

 
91,353

Unamortized expense and premiums on retired debt and equity issuances (19 to 30 years; 6 to 18 years remaining)
14,089

 
15,569

Vacation earned, but not yet taken (1 year)
10,420

 
10,248

Postretirement benefits other than pensions (18 years; less than 1 year remaining)

 
18

Other (1 to 50 years; 1 to 46 years remaining)
29,955

 
17,997

 
$
896,731

 
$
905,264

Included in:
 

 
 

Current assets
$
72,231

 
$
71,421

Long-term assets
824,500

 
833,843

 
$
896,731

 
$
905,264


Regulatory liabilities were as follows:
December 31
2015

 
2014

(in thousands)
 

 
 

Cost of removal in excess of salvage value (1 to 60 years)
$
357,825

 
$
331,000

Retirement benefit plans (5 years beginning with respective utility’s next rate case)
9,835

 
12,413

Other (5 years; 1 to 2 years remaining)
3,883

 
1,436

 
$
371,543

 
$
344,849

Included in:
 
 
 
Current liabilities
$
2,204

 
$
632

Long-term liabilities
369,339

 
344,217

 
$
371,543

 
$
344,849


The regulatory asset and liability relating to retirement benefit plans was recorded as a result of pension and OPEB tracking mechanisms adopted by the PUC in rate case decisions for the Utilities in 2007 (see Note 10).
Major customers.  The Utilities received 11% ($265 million), 12% ($350 million) and 11% ($340 million) of their operating revenues from the sale of electricity to various federal government agencies in 2015, 2014 and 2013, respectively.
Cumulative preferred stock. The following series of cumulative preferred stock are redeemable only at the option of the respective company at the following prices in the event of voluntary liquidation or redemption:
December 31, 2015
Voluntary
liquidation price
 
Redemption
price
Series
 

 
 

C, D, E, H, J and K (Hawaiian Electric)
$
20

 
$
21

I (Hawaiian Electric)
20

 
20

G (Hawaii Electric Light)
100

 
100

H (Maui Electric)
100

 
100


Hawaiian Electric is obligated to make dividend, redemption and liquidation payments on the preferred stock of each of its subsidiaries if the respective subsidiary is unable to make such payments, but this obligation is subordinated to Hawaiian Electric's obligation to make payments on its own preferred stock.
Related-party transactions. HEI charged the Utilities $6.5 million, $7.0 million and $6.2 million for general management and administrative services in 2015, 2014 and 2013, respectively. The amounts charged by HEI to its subsidiaries for services provided by HEI employees are allocated primarily on the basis of time expended in providing such services.
Hawaiian Electric’s short-term borrowings totaled nil at December 31, 2015 and 2014. The interest charged on short-term borrowings from HEI is based on the lower of HEI’s or Hawaiian Electric’s effective weighted average short-term external borrowing rate. If both HEI and Hawaiian Electric do not have short-term external borrowings, the interest is based on the average of the effective rate for 30-day dealer-placed commercial paper quoted by the Wall Street Journal plus 0.15%.
Borrowings among the Utilities are eliminated in consolidation. Interest charged by HEI to Hawaiian Electric was nil in each of 2015, 2014 and 2013.
Commitments and contingencies.
Fuel contracts.  The Utilities have contractual agreements to purchase minimum quantities of fuel oil, diesel fuel and biodiesel for multi-year periods, some through October 2017. Fossil fuel prices are tied to the market prices of crude oil and petroleum products in the Far East and U.S. West Coast and the biodiesel price is tied to the market prices of animal fat feedstocks in the U.S. West Coast and U.S. Midwest. Based on the average price per barrel as of December 31, 2015, the estimated cost of minimum purchases under the fuel supply contracts is $245 million in 2016, $4 million in 2017 and nil in 2018. The actual cost of purchases in 2016 and future years could vary substantially from this estimate of minimum purchases as a result of changes in market prices, quantities actually purchased, entry into new supply contracts and/or other factors. The Utilities purchased $0.6 billion, $1.1 billion and $1.1 billion of fuel under contractual agreements in 2015, 2014 and 2013, respectively.
Hawaiian Electric and Chevron Products Company (Chevron), a division of Chevron USA, Inc., are parties to the Low Sulfur Fuel Oil Supply Contract (LSFO Contract) for the purchase/sale of low sulfur fuel oil (LSFO), which terminates on December 31, 2016 and may automatically renew for annual terms thereafter unless earlier terminated by either party. The PUC approved the recovery of costs incurred under this contract on April 30, 2013.
On August 27, 2014, Chevron and Hawaiian Electric entered into a first amendment of the LSFO Contract. The amendment reduces the price of fuel above certain volumes, allows for increases in the volume of fuel, and modifies the specification of certain petroleum products supplied under the contract. In addition, Chevron agreed to supply a blend of LSFO and diesel as soon as January 2016 (for supply through the end of the contract term, December 31, 2016) to help Hawaiian Electric meet more stringent EPA air emission requirements known as Mercury and Air Toxics Standards. In March 2015, the amendment was approved by the PUC.
The Utilities are also parties to amended contracts for the supply of industrial fuel oil and diesel fuels with Chevron and Hawaii Independent Energy, LLC, (HIE), respectively, which were scheduled to end December 31, 2015, but have been extended through December 31, 2016. Both agreements may be automatically renewed for annual terms thereafter unless earlier terminated by either of the respective parties.
In August 2014, Chevron and the Utilities entered into a third amendment to the Inter-Island Industrial Fuel Oil and Diesel Fuel Supply Contract (Inter-island Fuel Supply Contract), which amendment extended the term of the contract through December 31, 2016 and provided for automatic renewal for annual terms thereafter unless earlier terminated by either party. In February 2015, Hawaiian Electric executed a similar extension, through December 31, 2016, of the corresponding Inter-Island Industrial Fuel Oil and Diesel Fuel Supply Contract with HIE.
In June 2015, the Utilities issued Requests for Proposals (RFP) for most of their fuel needs with supplies beginning in 2017 after the expiration of Chevron LSFO and Chevron/HIE Interisland contracts on December 31, 2016. Proposals were received in July 2015.
On February 18, 2016, Hawaiian Electric and Chevron entered into a fuel supply contract for LSFO, diesel and fuel to meet MATS requirements (2016 LSFO Contract) for the island of Oahu which terminates on December 31, 2019 and may automatically renew for annual terms thereafter unless earlier terminated by either party. Also on February 18, 2016, the Utilities and Chevron entered into a supply contract for industrial fuel oil, diesel and ultra-low sulfur diesel (Petroleum Fuels Contract) for the islands of Oahu, Maui, Molokai and the island of Hawaii , which terminates on December 31, 2019 and may automatically renew for annual terms thereafter unless earlier terminated by either party. Finally, on February 18, 2016, Hawaii Electric Light and Chevron entered into a fuels terminalling agreement which terminates on December 31, 2019 for the island of Hawaii and may automatically renew for annual terms thereafter unless earlier terminated by either party. Currently, terminalling services are provided for under the Inter-island Fuel Supply Contract with Chevron that expires on December 31, 2016. Each of these contracts are for a term of three years and become effective upon PUC approval and each can be terminated if PUC approval is not received by October 1, 2016. Additionally, Chevron is required to comply with the agreed upon fuel specifications as set forth in the 2016 LSFO Contract and the Petroleum Fuels Contract.
The energy charge for energy purchased from Kalaeloa Partners, L.P. (Kalaeloa) under Hawaiian Electric’s PPA with Kalaeloa is based, in part, on the price Kalaeloa pays HIE for LSFO under a Facility Fuel Supply Contract (fuel contract) between them (assigned to HIE upon its purchase of the assets of Tesoro Hawaii Corp. as described above). The term of the fuel contract between Kalaeloa and HIE ends May 31, 2016 and may be extended for terms thereafter unless terminated by one of the parties.
The costs incurred under the Utilities’ fuel contracts are included in their respective ECACs, to the extent such costs are not recovered through the Utilities’ base rates.
Power purchase agreements.  As of December 31, 2015, the Utilities had five firm capacity PPAs for a total of 551 megawatts (MW) of firm capacity. Purchases from these five independent power producers (IPPs) and all other IPPs totaled $0.6 billion, $0.7 billion and $0.7 billion for 2015, 2014 and 2013, respectively. The PUC allows rate recovery for energy and firm capacity payments to IPPs under these agreements. Assuming that each of the agreements remains in place for its current term (and as amended) and the minimum availability criteria in the PPAs are met, aggregate minimum fixed capacity charges are expected to be approximately $0.1 billion per year for 2016 through 2020 and a total of $0.5 billion in the period from 2021 through 2035.
In general, the Utilities base their payments under the PPAs upon available capacity and actually supplied energy and they are generally not required to make payments for capacity if the contracted capacity is not available, and payments are reduced, under certain conditions, if available capacity drops below contracted levels. In general, the payment rates for capacity have been predetermined for the terms of the agreements. Energy payments will vary over the terms of the agreements. The Utilities pass on changes in the fuel component of the energy charges to customers through the ECAC in their rate schedules. The Utilities do not operate, or participate in the operation of, any of the facilities that provide power under the agreements. Title to the facilities does not pass to Hawaiian Electric or its subsidiaries upon expiration of the agreements, and the agreements do not contain bargain purchase options for the facilities.
Purchase power adjustment clause. The PUC has approved purchased power adjustment clauses (PPACs) for the Utilities. Purchased power capacity, O&M and other non-energy costs previously recovered through base rates are now recovered in the PPACs and, subject to approval by the PUC, such costs resulting from new purchased power agreements can be added to the PPACs outside of a rate case. Purchased energy costs continue to be recovered through the ECAC to the extent they are not recovered through base rates.
AES Hawaii, Inc. Under a PPA entered into in March 1988, as amended, for a period of 30 years beginning September 1992, Hawaiian Electric agreed to purchase 180 MW of firm capacity from AES Hawaii. In August 2012, Hawaiian Electric filed an application with the PUC seeking an exemption from the PUC’s Competitive Bidding Framework to negotiate an amendment to the PPA to purchase 186 MW of firm capacity, and amend the energy pricing formula in the PPA. The PUC approved the exemption in April 2013, but Hawaiian Electric and AES Hawaii were not able to reach agreement on an amendment. In June 2015, AES Hawaii filed an arbitration demand regarding a dispute about whether Hawaiian Electric was obligated to buy up to 9 MW of additional capacity based on a 1992 letter. Hawaiian Electric responded to the arbitration demand and, in October 2015, AES Hawaii and Hawaiian Electric entered into a Settlement Agreement to stay the arbitration proceeding. The Settlement Agreement includes certain conditions precedent which, if satisfied will release the parties from the claims under the arbitration proceeding. Among the conditions precedent is the successful negotiation of an amendment to the existing purchase power agreement and PUC approval of such amendment.
On November 13, 2015, Hawaiian Electric entered into Amendment No. 3 to the PPA, subject to PUC approval. Amendment No. 3 provides more favorable pricing for the additional 9 MW than the existing pricing, the benefit of which will be passed on to customers, and among other things, provides (1) for an increase in firm capacity of up to 9 MW (the Additional Capacity) above the 180 MW capacity of the AES Hawaii facility, subject to a demonstration of such increased available capacity, (2) for the payment for the Additional Capacity to include a Priority Peak Capacity Charge, a Non-Peak Capacity Charge, a Priority Peak Energy Charge and a Non-Peak Energy Charge, and (3) that AES will make certain operational commitments to improve reliability, and Hawaiian Electric will pay a reliability bonus according to a schedule for reduced Full Plant Trips. On January 22, 2016, Amendment No. 3 was filed with the PUC for approval. If such approval is obtained, the final condition to the Settlement Agreement’s release of the parties from the arbitration claims will be satisfied. The arbitration proceeding has been stayed to allow the PUC approval proceeding to proceed.
Liquefied natural gas. On May 31, 2015, the previous August 2014 agreement with Fortis BC Energy Inc. (Fortis) for liquefaction capacity for liquefied natural gas (LNG) was superseded with a liquefaction Heads of Agreement by and between FortisBC Holdings Inc. and Hawaiian Electric. The agreement, which is subject to PUC approval, other regulatory approvals and permits and other conditions precedent before it becomes effective, provides for LNG liquefaction capacity purchases of 700,000 tonnes per year for the first five years, 600,000 tonnes per year for the next five years and 500,000 tonnes per year for the last ten years. Fortis must also obtain regulatory and other approvals for the agreement to become effective. The Fortis agreement is assignable and can be assigned to the selected bidder in the Utilities’ RFP for the supply of containerized LNG and will help ensure that liquefaction capacity is available at pricing that management believes will lower customer bills.
Utility projects.  Many public utility projects require PUC approval and various permits from other governmental agencies. Difficulties in obtaining, or the inability to obtain, the necessary approvals or permits can result in significantly increased project costs or even cancellation of projects. In the event a project does not proceed, or if it becomes probable the PUC will disallow cost recovery for all or part of a project, project costs may need to be written off in amounts that could result in significant reductions in Hawaiian Electric’s consolidated net income.
Renewable energy project matters.  In November 2013, Hawaiian Electric and Maui Electric filed an application for recovery of its actual deferred costs totaling $405,000 (split evenly between Hawaiian Electric and Maui Electric) for outside contractor services for additional studies to determine the value proposition of interconnecting the islands of Oahu and of Maui County (Maui, Lanai, and Molokai) through the Renewable Energy Infrastructure Program (REIP) surcharge. In July 2015, the PUC approved recovery of the deferred costs for Hawaiian Electric over a four-month period, and over a two-year period for Maui Electric.
In February 2012, the PUC granted Hawaiian Electric’s request for deferred accounting treatment for the inter-island project support costs. The amount of the deferred costs was limited to $5.89 million. Through December 31, 2013, Hawaiian Electric deferred $3.1 million related to outside contractor service costs incurred with the Oahu 200 MW RFP, and began amortizing such costs over 3 years beginning in July 2014.
In May 2012, the PUC instituted a proceeding for a competitive bidding process for up to 50 MW of firm renewable geothermal dispatchable energy (Geothermal RFP) on the island of Hawaii, and in July 2012, Hawaii Electric Light filed an application to defer 2012 costs related to the Geothermal RFP. In November  2015, the PUC approved the deferral of $2.1 million of costs related to the Geothermal RFP, and will review the prudency and reasonableness of the deferred costs in the next Hawaii Electric Light rate case. In February 2013, Hawaii Electric Light issued the Final Geothermal RFP. Six bids were received, but Hawaii Electric Light notified bidders that none of the submitted bids sufficiently met both the low-cost and technical requirements of the Geothermal RFP. In October 2014, Hawaii Electric Light issued Addendum No. 1 (Best and Final Offer) and Attachment A (Best and Final Offer Bidder's Response Package) directly to five eligible bidders. The submittals received in January 2015 will be considered for final selection of one project to proceed with PPA negotiations. In February 2015, Ormat Technologies, Inc. was selected for an award and began PPA negotiations with Hawaii Electric Light. In February 2016, Hawaii Electric Light provided the PUC with a status update notifying the PUC that the selected bidder had determined the proposed project not to be economically and financially viable, resulting in conclusion of PPA negotiations.
Enterprise Resource Planning/Enterprise Asset Management (ERP/EAM) Implementation Project. The Utilities submitted its Enterprise Information System Roadmap to the PUC in June 2014 and refiled an application for an ERP/EAM implementation project in July 2014 with an estimated cost of $82.4 million. The refiled application addressed the concerns raised by the PUC, in the initial application, regarding the benefits to customers of completing this project. The estimated cost of the project included the cost of ERP software that had been purchased and recorded as a deferred cost.
To address the Consumer Advocate’s position that the proceeding should be stayed to determine if the project as proposed in the application is reasonable and necessary for future operations as an indirect NEE subsidiary, in May 2015, the Utilities filed a report describing the impact the pending merger with NEE would have on the scope, costs and benefits of the ERP/EAM project. The report indicated that the two viable courses of action for replacing its current system are Option A (to proceed with the project as initially scoped in the Application), and Option B (to move the Utilities to NEE’s existing ERP/EAM solutions). Option B is estimated to cost approximately $20.8 million less than Option A, but can only be pursued if the merger is approved. The Utilities requested the PUC to approve the commencement of work on Option B if the merger is approved; and in the alternative, Option A if the merger is not approved.
In October 2015, the PUC issued a D&O (1) finding that there is a need to replace the existing ERP/EAM system, and (2) deferring any ruling on whether it is reasonable and in the public interest for the Utilities to commence with the project under Options B or A.
In the D&O, the PUC denied the Utilities request to defer the cost for the ERP software purchased in 2012. As a result, the Utilities expensed the ERP software costs of $4.8 million in the third quarter of 2015.
The D&O requires the Utilities to file their bottom-up low-level benefits analysis for both Options A and B, and specified additional information required as part of the their Cost/Benefit Analysis, which will be due by April 8, 2016.
Management cannot predict the further outcome of this proceeding.
Schofield Generating Station Project. In August 2012, the PUC approved a waiver from the competitive bidding framework to allow Hawaiian Electric to negotiate with the U.S. Army for the construction of a 50 MW utility owned and operated firm, renewable and dispatchable generation facility at Schofield Barracks. In September 2015, the PUC approved Hawaiian Electric’s application to expend $167 million for the project. In approving the project, the PUC placed a cap of $167 million for the project, stated 90% of the cap is allowed for cost recovery through cost recovery mechanisms other than base rates, and stated the $167 million cap will be adjusted downward due to any reduction in the cost of the engine contract due to a reduction in the foreign exchange rate. Hawaiian Electric is required to take all necessary steps to lock in the lowest possible exchange rate. On January 5, 2016, Hawaiian Electric executed a window forward agreement which lowered the cost of the engine contract by $9.7 million, resulting in a revised project cap of $157.3 million. The generating station is now expected to be placed in service in the first quarter of 2018.
Environmental regulation.  The Utilities are subject to environmental laws and regulations that regulate the operation of existing facilities, the construction and operation of new facilities and the proper cleanup and disposal of hazardous waste and toxic substances. In recent years, legislative, regulatory and governmental activities related to the environment, including proposals and rulemaking under the Clean Air Act and Clean Water Act (CWA), have increased significantly and management anticipates that such activity will continue.
On August 14, 2014, the EPA published in the Federal Register the final regulations required by section 316(b) of the CWA designed to protect aquatic organisms from adverse impacts associated with existing power plant cooling water intake structures. The regulations were effective October 14, 2014 and apply to the cooling water systems for the steam generating units at Hawaiian Electric’s power plants on the island of Oahu. The regulations prescribe a process, including a number of required site-specific studies, for states to develop facility-specific entrainment and impingement controls to be incorporated in each facility’s National Pollutant Discharge Elimination System permit. In the case of Hawaiian Electric’s power plants, there are a number of studies that have yet to be completed before Hawaiian Electric and the State of Hawaii Department of Health (DOH) can determine what entrainment or impingement controls, if any, might be necessary at the affected facilities to comply with the new 316(b) rule.
On February 16, 2012, the Federal Register published the EPA’s final rule establishing the EPA’s National Emission Standards for Hazardous Air Pollutants for fossil-fuel fired steam electrical generating units (EGUs). The final rule, known as the Mercury and Air Toxics Standards (MATS), applies to the 14 EGUs at Hawaiian Electric’s power plants. MATS establishes the Maximum Achievable Control Technology standards for the control of hazardous air pollutants emissions from new and existing EGUs. Based on a review of the final rule and the benefits and costs of alternative compliance strategies, Hawaiian Electric has selected a MATS compliance strategy based on switching to lower emission fuels. The use of lower emission fuels will provide for MATS compliance at lower overall costs and avoid the reduction in operational flexibility imposed by emissions control equipment. Hawaiian Electric requested and received a one-year extension, resulting in a MATS compliance date of April 16, 2016. Hawaiian Electric submitted to the EPA a Petition for Reconsideration and Stay dated April 16, 2012, which asked the EPA to revise an emissions standard for non-continental oil-fired EGUs on the grounds that the promulgated standard was incorrectly derived. On April 21, 2015, the EPA denied Hawaiian Electric's Petition. Hawaiian Electric appealed the EPA’s denial of the Petition. On June 29, 2015, the U.S. Supreme Court found that the EPA’s determination that it was appropriate and “necessary” to regulate hazardous air pollutants from power plants was flawed because the EPA did not take the costs of compliance into account. The Supreme Court sent the MATS rule case back to the D.C. Circuit Court of Appeals for further proceedings. On December 15, 2015, the D.C. Circuit ordered the EPA to update its “appropriate and necessary” finding and ordered that the costs of compliance must be considered. The D.C. Circuit did not stay the MATS rule so all requirements of the MATS rule, including the April 16, 2016 compliance deadline remain in effect.
On February 6, 2013, the EPA issued a guidance document titled “Next Steps for Area Designations and Implementation of the Sulfur Dioxide National Ambient Air Quality Standard,” which outlines a process that will provide the states additional flexibility and time for their development of one-hour sulfur dioxide (SO2) National Ambient Air Quality Standard (NAAQS) implementation plans. In August 2015, the EPA published the final data requirements rule for states to characterize their air quality in relation to the one-hour SO2 NAAQS. Under this rule, the EPA expects to designate areas as attaining, or not attaining, the one-hour SO2 NAAQS in December 2017 or December 2020, depending on whether the area was characterized through modeling or monitoring. Hawaiian Electric will work with the DOH in implementing the one-hour SO2 NAAQS and in developing cost-effective strategies for NAAQS compliance, if needed.
Depending upon the rules and guidance developed for compliance with the more stringent NAAQS, the Utilities may be required to incur material capital expenditures and other compliance costs, but such amounts and their timing are not determinable at this time. Additionally, the combined effects of the CWA 316(b) regulations, the MATS rule and the more stringent NAAQS may contribute to a decision to retire or deactivate certain generating units earlier than anticipated.
Hawaiian Electric, Hawaii Electric Light and Maui Electric, like other utilities, periodically encounter petroleum or other chemical releases into the environment associated with current or previous operations. The Utilities report and take action on these releases when and as required by applicable law and regulations. The Utilities believe the costs of responding to such releases identified to date will not have a material adverse effect, individually or in the aggregate, on Hawaiian Electric’s consolidated results of operations, financial condition or liquidity.
Potential Clean Air Act Enforcement.  On July 1, 2013, Hawaii Electric Light and Maui Electric received a letter from the U.S. Department of Justice (DOJ) asserting potential violations of the Prevention of Significant Deterioration (PSD) and Title V requirements of the Clean Air Act involving the Hill and Kahului Power Plants. The parties are continuing to negotiate toward a resolution of the DOJ’s claims. As part of the ongoing negotiations, the DOJ proposed in November 2014 entering into a consent decree pursuant to which the Utilities would install certain pollution controls and pay a penalty. The Utilities continue to have discussions with, and provide information to, the DOJ, but are unable to estimate the amount or effect of a consent decree, if any, at this time.
Former Molokai Electric Company generation site.  In 1989, Maui Electric acquired by merger Molokai Electric Company. Molokai Electric Company had sold its former generation site (Site) in 1983, but continued to operate at the Site under a lease until 1985. The EPA has since performed Brownfield assessments of the Site that identified environmental impacts in the subsurface. Although Maui Electric never operated at the Site and operations there had stopped four years before the merger, in discussions with the EPA and the DOH, Maui Electric agreed to undertake additional investigations at the Site and an adjacent parcel that Molokai Electric Company had used for equipment storage (the Adjacent Parcel) to determine the extent of impacts of subsurface contaminants. A 2011 assessment by a Maui Electric contractor of the Adjacent Parcel identified environmental impacts, including elevated polychlorinated biphenyls (PCBs) in the subsurface soils. In cooperation with the DOH and EPA, Maui Electric is further investigating the Site and the Adjacent Parcel to determine the extent of impacts of PCBs, residual fuel oils, and other subsurface contaminants. Maui Electric has a reserve balance of $3.6 million as of December 31, 2015 for the additional investigation and estimated cleanup costs at the Site and the Adjacent Parcel; however, final costs of remediation will depend on the results of continued investigation. The final site investigation plan was submitted to the DOH and EPA in December 2014 for their approval. The DOH formally approved the investigation plan on September 14, 2015. The EPA determined that their formal approval is not required until the next phase of work that determines cleanup actions for the site. Sampling of the site per the investigation plan will proceed after securing required permits and access agreements.
Pearl Harbor sediment study. In July 2014, the U.S. Navy notified Hawaiian Electric of the Navy’s determination that Hawaiian Electric is responsible for cleanup of PCB contamination in sediment in the area offshore of the Waiau Power Plant. The Navy has also requested that Hawaiian Electric reimburse the costs incurred by the Navy to date to investigate the area, and is asking Hawaiian Electric to engage in negotiations regarding the financing and undertaking of future response actions to address the sediment contamination offshore from the Waiau Power Plant. The extent of the contamination, the appropriate remedial measures to address it, and Hawaiian Electric’s potential responsibility for any associated costs, including any past costs incurred by the Navy, have not yet been determined. The Navy has completed a remedial investigation and a feasibility study (FS) for the remediation of contaminated sediment at several locations in Pearl Harbor. The Navy’s study identified elevated levels of PCBs in the sediment in East Loch of Pearl Harbor, offshore from the Waiau Power Plant. The Navy issued its Final FS Report on June 29, 2015. The Navy has indicated that additional data collection is necessary and will be conducted as part of the remedial design, and that the results will be used to finalize the remediation plan and to better define the areas where remediation is necessary to reduce the potential environmental risks. Hawaiian Electric has requested to participate with the Navy in the preparation of the remedial design for the contaminated sediment offshore from the Waiau Power Plant, and in particular in the development of the work plan for additional data collection, and refinement of the environmental risk analysis, the final remedy, and the response costs for the offshore area. To date, Hawaiian Electric’s role in the development of the remedial design and response costs is uncertain.
On March 23, 2015, Hawaiian Electric received a letter from the EPA requesting that Hawaiian Electric submit a work plan to assess potential sources and extent of PCB contamination onshore at the Waiau Power Plant. Hawaiian Electric submitted a sampling and analysis (SAP) work plan to the EPA and the DOH. Sampling of outfall sediments at the Waiau Power Plant was completed in accordance with the SAP in December 2015. The extent of the onshore contamination, the appropriate remedial measures to address it, and any associated costs have not yet been determined.
As of December 31, 2015, the reserve account recorded by Hawaiian Electric to address the PCB contamination stands at $4.7 million. The reserve represents the probable and reasonably estimable cost to complete the onshore and offshore investigations and the remediation of PCB contamination in the offshore sediment. The final remediation costs will depend on the results of the onshore investigation and assessment of potential source control requirements, as well as the further investigation of contaminated sediment offshore from the Waiau Power Plant.
Hawaiian Electric has also conducted a search for other potential sources of sediment contamination in the Waiau area that are unrelated to electric power generation at its Waiau Power Plant. Hawaiian Electric has identified a potential source east of the plant: a former Naval Reserve (a Formerly Used Defense Site (FUDS)) where a used drum storage area, a waste oil burning pit, and an oil/water separator were operated by the Navy from the 1940s until approximately 1962. This FUDS is located on the property currently occupied by the City and County (C&C) of Honolulu’s Neal S. Blaisdell Park. To further assess this former Naval Reserve site, Hawaiian Electric has requested environmental investigation reports, environmental data, and permits for this property and the adjacent Waimalu Stream (e.g., dredging permits and related environmental impact assessments and studies) from several federal and state agencies, as well as the C&C of Honolulu. The contribution of PCBs to sediment contamination in East Loch from this potential source has not yet been determined.
Global climate change and greenhouse gas emissions reduction.  National and international concerns about climate change and the contribution of greenhouse gas (GHG) emissions (including carbon dioxide emissions from the combustion of fossil fuels) to climate change have led to federal legislative and regulatory proposals and action by the State of Hawaii to reduce GHG emissions.
In July 2007, the State Legislature passed Act 234, which requires a statewide reduction of GHG emissions by January 1, 2020 to levels at or below the statewide GHG emission levels in 1990. On June 20, 2014, the Governor signed the final regulations required to implement Act 234 (i.e., the final GHG rule), which went into effect on June 30, 2014. In general, Act 234 and the corresponding GHG rule require affected sources (that have the potential to emit GHGs in excess of established thresholds) to reduce their GHG emissions by 16% below 2010 emission levels by 2020. In accordance with the GHG rule, the Utilities submitted their Emissions Reduction Plan (EmRP) to the DOH on June 30, 2015. Hawaiian Electric, Maui Electric, and Hawaii Electric Light have a total of 11 facilities affected by the state GHG rule. Hawaiian Electric made use of the partnering provisions in the DOH GHG rule to prepare one EmRP for all 11 of the Utilities’ affected facilities. In this plan, the Utilities have committed to a 16% reduction in GHG emissions company-wide. Pursuant to the State’s GHG rule, the DOH will incorporate the proposed facility-specific GHG emission limits into each facility’s covered source permit based on the 2020 levels specified in Hawaiian Electric’s approved EmRP. The GHG rule also requires affected sources to pay an annual fee that is based on tons per year of GHG emissions starting on the effective date of the regulations. The fee for the Utilities is estimated to be approximately $0.5 million annually. The latest assessment of the proposed federal and final state GHG rules is that the continued growth in renewable power generation will significantly reduce the compliance costs and risk for the Utilities.
On September 22, 2009, the EPA issued its “Final Mandatory Reporting of Greenhouse Gases Rule,” which requires sources that emit GHGs above certain threshold levels to monitor and report their GHG emissions. Following these requirements, the Utilities have submitted the required reports for 2010 through 2014 to the EPA. In December 2009, the EPA made the finding that motor vehicle GHG emissions endanger public health or welfare. Since then, the EPA has also issued rules to address GHG emissions from stationary sources, like the Utilities’ EGUs.
As part of President Obama’s Climate Action Plan, the EPA has been directed to adopt GHG emission limits for new and existing EGUs. The EPA issued the final federal rule for GHG emission reductions from existing EGUs, also known as the Clean Power Plan, on August 3, 2015. The final federal GHG rule for existing EGUs sets interim state-wide emissions limits for EGUs operating in the 48 contiguous states that must be met on average from 2022 through 2029; final limits will apply from 2030. The EPA did not issue final guidelines for Alaska, Hawaii, Puerto Rico or Guam because the Best System of Emission Reduction established for the contiguous states is not appropriate for these locations. The EPA has said it will work with the state and territorial governments for Alaska, Hawaii, Puerto Rico and Guam and other stakeholders to gather additional information regarding the emissions reduction measures available in these jurisdictions, particularly with respect to renewable generation. Hawaiian Electric plans to participate in this process. Management’s latest assessment of the Clean Power Plan is that the continued growth of renewable power generation and the expected use of LNG as a transitional fuel by the Utilities in the future will significantly reduce the compliance costs and risk for the Utilities. To date, no timetable has been established by the EPA to develop GHG emission limits for Alaska, Hawaii, Puerto Rico or Guam, and such timing has become more uncertain in light of the decision of the U.S. Supreme Court on February 9, 2016, blocking implementation of the Clean Power Plan while it is being challenged in court.
The Utilities have taken, and continue to identify opportunities to take, direct action to reduce GHG emissions from their operations, including, but not limited to, supporting DSM programs that foster energy efficiency, using renewable resources for energy production and purchasing power from IPPs generated by renewable resources, burning renewable biodiesel in Hawaiian Electric’s Campbell Industrial Park combustion turbine No. 1 (CIP CT-1), using biodiesel for startup and shutdown of selected Maui Electric generating units, and testing biofuel blends in other Hawaiian Electric and Maui Electric generating units. The Utilities are also working with the State of Hawaii and other entities to pursue the use of LNG as a cleaner and lower-cost fuel to replace, at least in part, the petroleum oil that would otherwise be used. Management is unable to evaluate the ultimate impact on the Utilities’ operations of more comprehensive GHG regulations that might be promulgated; however, the various initiatives that the Utilities are pursuing are likely to provide a sound basis for appropriately managing the Utilities’ carbon footprint and thereby meet both state and federal GHG reduction goals.
While the timing, extent and ultimate effects of climate change cannot be determined with any certainty, climate change is predicted to result in sea level rise. This effect could potentially result in impacts to coastal and other low-lying areas (where much of the Utilities’ electric infrastructure is sited), and result in increased flooding and storm damage due to heavy rainfall, increased rates of beach erosion, saltwater intrusion into freshwater aquifers and terrestrial ecosystems, and higher water tables in low-lying areas. The effects of climate change on the weather (for example, more intense or more frequent rain events, flooding, or hurricanes), sea levels, and freshwater availability and quality have the potential to materially adversely affect the results of operations, financial condition, and liquidity of the Utilities. For example, severe weather could cause significant harm to the Utilities’ physical facilities.
Asset retirement obligations.  AROs represent legal obligations associated with the retirement of certain tangible long-lived assets, are measured as the present value of the projected costs for the future retirement of specific assets and are recognized in the period in which the liability is incurred if a reasonable estimate of fair value can be made. The Utilities’ recognition of AROs have no impact on their earnings. The cost of the AROs is recovered over the life of the asset through depreciation. AROs recognized by the Utilities relate to obligations to retire plant and equipment, including removal of asbestos and other hazardous materials.
Hawaiian Electric has recorded estimated AROs related to removing retired generating units at its Honolulu and Waiau power plants. These removal projects are ongoing, with significant activity and expenditures occurring in 2014 in partial settlement of these liabilities. Both removal projects are expected to continue through 2015.
Changes to the ARO liability included in “Other liabilities” on Hawaiian Electric’s balance sheet were as follows:
(in thousands)
2015
 
2014
Balance, January 1
$
29,419

 
$
43,106

Accretion expense
24

 
890

Liabilities incurred

 

Liabilities settled
(2,595
)
 
(14,577
)
Revisions in estimated cash flows

 

Balance, December 31
$
26,848

 
$
29,419


Decoupling. In 2010, the PUC issued an order approving decoupling, which was implemented by Hawaiian Electric on March 1, 2011, by Hawaii Electric Light on April 9, 2012 and by Maui Electric on May 4, 2012. Decoupling is a regulatory model that is intended to facilitate meeting the State of Hawaii’s goals to transition to a clean energy economy and achieve an aggressive renewable portfolio standard. The decoupling model implemented in Hawaii delinks revenues from sales and includes annual rate adjustments for certain O&M expenses and rate base changes. The decoupling mechanism has three components: (1) a sales decoupling component via a revenue balancing account (RBA), (2) a revenue escalation component via a rate adjustment mechanism (RAM) and (3) an earnings sharing mechanism, which would provide for a reduction of revenues between rate cases in the event the utility exceeds the ROACE allowed in its most recent rate case. Decoupling provides for more timely cost recovery and earning on investments.
On May 31, 2013, as provided for in its original order issued in 2010 approving decoupling and citing three years of implementation experience for Hawaiian Electric, the PUC opened an investigative docket to review whether the decoupling mechanisms are functioning as intended, are fair to the Utilities and their ratepayers, and are in the public interest. The PUC affirmed its support for the continuation of the sales decoupling (RBA) mechanism and stated its interest in evaluating the RAM to ensure it provides the appropriate balance of risks, costs, incentives and performance requirements, as well as administrative efficiency, and whether the current interest rate applied to the outstanding RBA balance is reasonable. In October 2013, the PUC issued orders that bifurcated the proceeding (into Schedule A and Schedule B issues).
On February 7, 2014, the PUC issued a decision and order (D&O) on the Schedule A issues, which made certain modifications to the decoupling mechanism. Specifically, the D&O required:
An adjustment to the Rate Base RAM Adjustment to include 90% of the amount of the current RAM Period Rate Base RAM Adjustment that exceeds the Rate Base RAM Adjustment from the prior year, to be effective with the Utilities’ 2014 decoupling filing.
Effective March 1, 2014, the interest rate to be applied on the outstanding RBA balances to be the short term debt rate used in each Utilities last rate case (ranging from 1.25% to 3.25%), instead of the 6% that had been previously approved.
As required, the Utilities have made available to the public, on the Utilities’ websites, performance metrics identified by the PUC. The Utilities are updating the performance metrics on a quarterly basis.
On March 31, 2015, the PUC issued an Order (the March Order) related to the Schedule B portion of the proceeding to make certain further modifications to the decoupling mechanism, and to establish a briefing schedule with respect to certain issues in the proceeding. The March Order modified the RAM portion of the decoupling mechanism to be capped at the lesser of the RAM Revenue Adjustment as currently determined (adjusted to eliminate the 90% limitation on the current RAM Period Rate Base RAM adjustment that was ordered in the Schedule A portion of the proceeding) and a RAM Revenue Adjustment calculated based on the cumulative annual compounded increase in Gross Domestic Product Price Index (GDPPI) applied to the 2014 annualized target revenues (adjusted for certain items specified in the Order). The 2014 annualized target revenues represent the target revenues from the last rate case, and RAM revenues, offset by earnings sharing credits, if any, allowed under the decoupling mechanism through the 2014 decoupling filing. The Utilities may apply to the PUC for approval of recovery of revenues for Major Projects (including related baseline projects grouped together for consideration as Major Projects) through the RAM above the RAM cap or outside of the RAM through the Renewable Energy Infrastructure Program (REIP) surcharge or other adjustment mechanism. The RAM was amended on an interim basis pending the outcome of the PUC’s review of the Utilities’ Power Supply Improvement Plans. The triennial rate case cycle required under the decoupling mechanism continues to serve as the maximum period between the filing of general rate cases, and the amendments to the RAM do not limit or dilute the ordinary opportunities for the Utilities to seek rate relief according to conventional/traditional ratemaking procedures.
In making the modifications to the RAM Adjustment, the PUC stated the changes are designed to provide the PUC with control of and prior regulatory review over substantial additions to baseline projects between rate cases. The modifications do not deprive the Utilities of the opportunity to recover any prudently incurred expenditure or limit orderly recovery for necessary expanded capital programs.
The RBA, which is the sales decoupling component, was retained by the PUC in its March Order, and the PUC made no change in the authorized return on common equity. The PUC stated that performance-based ratemaking is not adopted at this time.
On May 28, 2015, the PUC issued an Order (the May Order) related to the Utilities’ revised annual decoupling filing for tariffed rates submitted on April 15, 2015. The May Order ruled on the specific matters identified by the PUC in its information requests and by the Consumer Advocate in its Statement of Position. As a result of the May Order, on June 3, 2015, the Utilities filed revised tariff rates reflecting a reduction to the RAM portion of the tariff filing. The revision was made primarily to adjust the RAM to reflect reduced operations and maintenance expenses associated with the Utilities’ change in estimate related to the allocation of indirect costs implemented in 2014, and to exclude the GDPPI factor on the depreciation expense portion for the calculation of the 2015 RAM Cap. The May Order also requires a one-time adjustment to customers for the impact of bonus tax depreciation enacted in December 2014 on the RAM revenues used for the 2014 tariff filing.
The revised 2015 annual incremental RAM revenues for the Utilities amounts to $11.1 million compared to the $26.2 million filed on April 15, 2015 and the $31.6 million filed on March 31, 2015 based on the methodology prior to its modification in the March Order. The tariffed rates, which became effective on June 8, 2015, also include the collection or refund of the accrued RBA balance and associated revenue taxes as of December 31, 2014 and any accrued earnings sharing mechanism credits. The net refund to be provided by the three Utilities under the revised tariffs amounts to $0.4 million, compared to a collection of $14.7 million under the tariffs filed on April 15, 2015. Below is a summary of the 2015 incremental impact by company.
($ in millions)
 
Hawaiian Electric
 
Hawaii Electric Light
 
Maui Electric
Annual incremental RAM adjusted revenues
 
$
8.1

 
$
1.5

 
$
1.5

Annual change in accrued earnings sharing credits to be refunded
 
$

 
$

 
$
(0.1
)
Annual change in accrued RBA balance as of December 31, 2015 (and associated revenue taxes) to be collected
 
$
(9.2
)
 
$
0.1

 
$
(2.2
)
Net annual incremental amount to be collected under the tariffs
 
$
(1.1
)
 
$
1.5

 
$
(0.8
)
Impact on typical residential customer monthly bill (in dollars) *
 
$
(0.09
)
 
$
0.88

 
$
(0.13
)
Note: Columns may not foot due to rounding
* Based on a 500 kilowatthour (KWH) bill for Hawaiian Electric, Maui Electric, and Hawaii Electric Light. The bill impact for Lanai and Molokai customers is a decrease of $0.11, based on a 400 KWH bill.
As required by the March Order, the Parties filed initial and reply briefs related to the following issues: (1) whether and, if so, how the conventional performance incentive mechanisms proposed in this proceeding should be refined and implemented in this docket; (2) what are the appropriate steps, processes and timing for determining measures to improve the efficiency and effectiveness of the general rate case filing and review process; and (3) what are the appropriate steps, processes and timing to further consider the merits of the proposed changes to the ECAC identified in this proceeding. In identifying the issue on possible changes to the ECAC, the PUC stated that changes to the ECAC should be made with great care to avoid unintended consequences.
In accordance with the March Order, the Utilities and the Consumer Advocate filed on June 15, 2015, their Joint Proposed Modified REIP Framework/Standards and Guidelines regarding the eligibility of projects for cost recovery above the RAM Cap through the REIP surcharge. On the same date, the Utilities filed their proposed standards and guidelines on the eligibility of projects for cost recovery through the RAM above the RAM Cap. On June 30, 2015, the Consumer Advocate filed comments on this proposal, and the County of Hawaii filed comments on both the REIP and the RAM above the RAM Cap proposals. On October 26, 2015, Hawaiian Electric filed an application to recover the revenue requirements associated with 2015 net plant additions in the amount of $40.3 million and other associated costs for its Underground Cable Program and the 138kV Transmission and 46kV Sub-Transmission Structures Major Baseline Projects through the RAM above the 2015 RAM Cap. On October 30, 2015, Maui Electric filed an application to recover the revenue requirements associated with 2015 net plant additions in the amount of $4.3 million and other associated costs for its transmission and distribution and generation plant reliability Major Baseline Project through the RAM above the 2015 RAM Cap. In November 2015, the Consumer Advocate filed preliminary statements of position (PSOPs) on these two applications, recommending that the PUC reject the applications. In December 2015, the Utilities filed responses to the Consumer Advocate’s PSOPs, pointing out that the PUC had already authorized the filing of such applications for recovery of capital costs above the RAM Cap and requesting that the PUC proceed with review of the applications.
Potential impact of lava flows. In June 2014, lava from the Kilauea Volcano on the island of Hawaii began flowing toward the town of Pahoa. Hawaii Electric Light monitored utility property and equipment near the affected areas and protected that property and equipment to the extent possible (e.g., building barriers around poles). In March 2015 Hawaii Electric Light filed an application with the PUC requesting approval to defer costs incurred to monitor, prepare for, respond to, and take other actions necessary in connection with the June 2014 Kilauea lava flow such that Hawaii Electric Light can request PUC approval to recover those costs in a future rate case. The Consumer Advocate objected to the request. A PUC decision is pending.
April 2014 regulatory orders. In April 2014, the PUC issued four orders that collectively address certain key policy, resource planning and operational issues for the Utilities. The four orders are as follows:
Integrated Resource Planning. The PUC did not accept the Utilities’ Integrated Resource Plan and Action Plans submission, and, in lieu of an approved plan, has commenced other initiatives to enable resource planning. The PUC directed each of Hawaiian Electric and Maui Electric to file within 120 days its respective Power Supply Improvement Plans (PSIPs), and the PSIPs were filed in August 2014. The PUC also provided its inclinations on the future of Hawaii’s electric utilities in an exhibit to the order. The exhibit provides the PUC’s perspectives on the vision, business strategies and regulatory policy changes required to align the Utilities' business model with customers’ interests and the state’s public policy goals.
Reliability Standards Working Group. The PUC ordered the Utilities (and in some cases the Kauai Island Utility Cooperative (KIUC)) to take timely actions intended to lower energy costs, improve system reliability and address emerging challenges to integrate additional renewable energy. In addition to the PSIPs mentioned above, the PUC ordered certain filing requirements which include the following:
Distributed Generation Interconnection Plan - the Utilities’ Plan was filed in August 2014.
Plan to implement an on-going distribution circuit monitoring program to measure real-time voltage and other power quality parameters - the Utilities’ Plan was filed in June 2014.
Action Plan for improving efficiencies in the interconnection requirements studies - the Utilities’ Plan was filed in May 2014.
The Utilities are to file monthly reports providing details about interconnection requirements studies.
Integrated interconnection queue for each distribution circuit for each island grid - the Utilities’ integrated interconnection queue plan was filed in August 2014 and the integrated interconnection queues were implemented in January 2015.
The PUC also stated it would be opening new dockets to address (1) reliability standards, (2) the technical, economic and policy issues associated with distributed energy resources (see “Distributed Energy Resources (DER) Investigative Proceeding” below) and (3) the Hawaii electricity reliability administrator, which is a third party position which the legislature has authorized the PUC to create by contract to provide support for the PUC in developing and periodically updating local grid reliability standards and procedures and interconnection requirements and overseeing grid access and operation.
Policy Statement and Order Regarding Demand Response Programs. The PUC provided guidance concerning the objectives and goals for demand response programs, and ordered the Utilities to develop an integrated Demand Response Portfolio Plan that will enhance system operations and reduce costs to customers. The Utilities’ Plan was filed in July 2014. Subsequently, the Utilities submitted status updates and an update and supplemental report to the Plan. On July 28, 2015, the PUC issued an order appointing a special advisor to guide, monitor and review the Utility’s Plan design and implementation. On December 30, 2015, the Utilities filed applications with the PUC (1) for approval of their proposed DR Portfolio Tariff Structure, Reporting Schedule and Cost Recovery of Program Costs through the Demand-Side Management (DSM) Surcharge, and (2) for approval to defer and recover certain computer software and software development costs for a Demand Response Management System (DRMS) through the Renewable Energy Infrastructure Program (REIP) Surcharge.
Maui Electric Company 2012 Test Year Rate Case. The PUC acknowledged the extensive analyses provided by Maui Electric in its System Improvement and Curtailment Reduction Plan (SICRP) filed in September 2013. The PUC stated that it is encouraged by the changes in Maui Electric’s operations that have led to a significant reduction in the curtailment of renewables, but stated that Maui Electric has not set forth a clearly defined path that addresses integration and curtailment of additional renewables. The PUC directed Maui Electric to present a PSIP to address present and future system operations so as to not only reduce curtailment, but to optimize the operation of its system for its customers’ benefit. The Maui Electric PSIP was filed in August 2014, and is currently being reviewed by the PUC in a new docket along with the Hawaiian Electric and Hawaii Electric Light PSIPs. Maui Electric filed its second annual SICRP status update in September 2015.
Review of PSIPs. Collectively, the PUC's April 2014 resource planning orders confirm the energy policy and operational priorities that will guide the Utilities' strategies and plans going forward.
PSIPs for Hawaiian Electric, Maui Electric and Hawaii Electric Light were filed in August 2014. The PSIPs each include a tactical plan to transform how electric utility services will be offered to meet customer needs and produce higher levels of renewable energy. Each plan contains a diversified mix of technologies, including significant distributed and utility‑scale renewable resources, that is expected to result, on a consolidated basis, in over 65% of the Utilities’ energy being produced from renewable resources by 2030. Under these plans, the Utilities will support sustainable growth of rooftop solar, expand use of energy storage systems, empower customers by developing smart grids, offer new products and services to customers (e.g., community solar, microgrids and voluntary “demand response” programs), switch from high-priced oil to lower cost liquefied natural gas, retire higher-cost, less efficient existing oil-based steam generators and lower full service residential customer bills in real dollars.
In November 2015, the PUC issued an order in the proceeding to review the PSIPs filed. The order provided observations and concerns on the PSIPs submitted. In November 2015, as required by the order, the Utilities submitted a Proposed Revision Plan, which included a schedule and a work plan to supplement, amend and update the PSIPs in order to address the PUC’s observations and concerns, including an Interim PSIP Update filing in February 2016 and updated PSIPs by April 1, 2016. The parties and participants filed comments on the Utilities Proposed Revision Plan in January 2016. The PUC is expected to provide further guidance regarding the substance and course of the proceeding.
In February 2016, the Utilities filed their PSIP Update Interim Status Report with the PUC, which discusses the status of the Utilities’ ongoing planning and analysis for a diverse mix of energy resources to meet the state’s 100% RPS goal by 2045. The report precedes more fully updated PSIPs to be filed by April 1, 2016.
Distributed Energy Resources (DER) Investigative Proceeding. In March 2015, the PUC issued an order to address DER issues.
On June 29, 2015, the Utilities submitted their final Statement of Position in the DER proceeding, which included:
(1)
new pricing provisions for future rooftop photovoltaic (PV) systems,
(2)
technical standards for advanced inverters,
(3)
new options for customers including battery-equipped rooftop PV systems,
(4)
a pilot time-of-use rate,
(5)
an improved method of calculating the amount of rooftop PV that can be safely installed, and
(6)
a streamlined and standardized PV application process.
On October 12, 2015, the PUC issued a D&O establishing DER reforms that: (1) promote rapid adoption of the next generation of solar PV and other distributed energy technologies; (2) encourage more competitive pricing of distributed energy resource systems; (3) lower overall energy supply costs for all customers; and (4) help to manage DER in terms of each island’s limited grid capacity.
The D&O approved a customer self-supply tariff and a customer grid supply tariff to govern customer generators connected to the Utilities’ systems. These tariffs replace the Net Energy Metering (NEM) program.
The D&O ordered the Utilities, among other things, (a) to collaborate with inverter manufacturers to develop a test plan by December 15, 2015 for the highest priority advanced inverter functions that are not UL certified and (b) to complete the circuit-level hosting capacity analysis for all islands in the Utilities’ service territories by December 10, 2015. The DER Phase 2 of this docket began in November 2015 and focused on further developing competitive markets for distributed energy resources, including storage.
On October 21, 2015, The Alliance for Solar Choice, LLC (TASC) filed a complaint in Hawaii state court seeking an order enjoining the PUC from implementing the D&O and declaring that the D&O be reversed, modified, and/or remanded to the PUC for further proceedings. On January 19, 2016, the Circuit Court entered a final judgment against TASC on all of its claims. TASC has filed a notice of appeal from the final judgment. TASC also filed a second appeal of the D&O directly with the Intermediate Court of Appeals. The Utilities have moved to dismiss this appeal, and the motion is currently pending before the Court.
Consolidating financial information. Hawaiian Electric is not required to provide separate financial statements or other disclosures concerning Hawaii Electric Light and Maui Electric to holders of the 2004 Debentures issued by Hawaii Electric Light and Maui Electric to HECO Capital Trust III (Trust III) since all of their voting capital stock is owned, and their obligations with respect to these securities have been fully and unconditionally guaranteed, on a subordinated basis, by Hawaiian Electric. Consolidating information is provided below for Hawaiian Electric and each of its subsidiaries for the periods ended and as of the dates indicated.
Hawaiian Electric also unconditionally guarantees Hawaii Electric Light’s and Maui Electric’s obligations (a) to the State of Hawaii for the repayment of principal and interest on Special Purpose Revenue Bonds issued for the benefit of Hawaii Electric Light and Maui Electric, (b) under their respective private placement note agreements and the Hawaii Electric Light notes and Maui Electric notes issued thereunder (see Hawaiian Electric and Subsidiaries' Consolidated Statements of Capitalization) and (c) relating to the trust preferred securities of Trust III (see Note 6). Hawaiian Electric is also obligated, after the satisfaction of its obligations on its own preferred stock, to make dividend, redemption and liquidation payments on Hawaii Electric Light’s and Maui Electric’s preferred stock if the respective subsidiary is unable to make such payments.
Consolidating statement of income
Year ended December 31, 2015
(in thousands)
Hawaiian Electric
 
Hawaii Electric Light
 
Maui Electric
 
Other subsidiaries
 
Consolidating adjustments
 
 
Hawaiian Electric
Consolidated
Revenues
$
1,644,181

 
345,549

 
345,517

 

 
(81
)
[1]
 
$
2,335,166

Expenses
 
 
 
 
 
 
 
 
 
 
 
 
Fuel oil
458,069

 
71,851

 
124,680

 

 

 
 
654,600

Purchased power
440,983

 
97,503

 
55,610

 

 

 
 
594,096

Other operation and maintenance
284,583

 
63,098

 
65,408

 

 

 
 
413,089

Depreciation
117,682

 
37,250

 
22,448

 

 

 
 
177,380

Taxes, other than income taxes
156,871

 
32,312

 
32,702

 

 

 
 
221,885

   Total expenses
1,458,188

 
302,014

 
300,848

 

 

 
 
2,061,050

Operating income
185,993

 
43,535

 
44,669

 

 
(81
)
 
 
274,116

Allowance for equity funds used during construction
5,641

 
604

 
683

 

 

 
 
6,928

Equity in earnings of subsidiaries
42,920

 

 

 

 
(42,920
)
[2]
 

Interest expense and other charges, net
(45,899
)
 
(10,773
)
 
(9,779
)
 

 
81

[1]
 
(66,370
)
Allowance for borrowed funds used during construction
1,967

 
215

 
275

 

 

 
 
2,457

Income before income taxes
190,622

 
33,581

 
35,848

 

 
(42,920
)
 
 
217,131

Income taxes
53,828

 
12,292

 
13,302

 

 

 
 
79,422

Net income
136,794

 
21,289

 
22,546

 

 
(42,920
)
 
 
137,709

Preferred stock dividends of subsidiaries

 
534

 
381

 

 

 
 
915

Net income attributable to Hawaiian Electric
136,794

 
20,755

 
22,165

 

 
(42,920
)
 
 
136,794

Preferred stock dividends of Hawaiian Electric
1,080

 

 

 

 

 
 
1,080

Net income for common stock
$
135,714

 
20,755

 
22,165

 

 
(42,920
)
 
 
$
135,714


Consolidating statement of comprehensive income
Year ended December 31, 2015
(in thousands)
Hawaiian Electric
 
Hawaii Electric Light
 
Maui Electric
 
Other subsidiaries
 
Consolidating
adjustments
 
 
Hawaiian Electric
Consolidated
Net income for common stock
$
135,714

 
20,755

 
22,165

 

 
(42,920
)
 
 
$
135,714

Other comprehensive income (loss), net of taxes:
 
 
 
 
 
 
 
 
 
 
 
 
Retirement benefit plans:
 

 
 

 
 

 
 

 
 
 
 
 

Net gains (losses) arising during the period, net of tax benefits
5,638

 
(2,710
)
 
(1,352
)
 

 
4,062

[1]
 
5,638

Less: amortization of transition obligation, prior service credit and net losses recognized during the period in net periodic benefit cost, net of tax benefits
20,381

 
2,728

 
2,503

 

 
(5,231
)
[1]
 
20,381

Less: reclassification adjustment for impact of D&Os of the PUC included in regulatory assets, net of taxes
(25,139
)
 
104

 
(1,107
)
 

 
1,003

[1]
 
(25,139
)
Other comprehensive income, net of tax benefits
880

 
122

 
44

 

 
(166
)
 
 
880

Comprehensive income attributable to common shareholder
$
136,594

 
20,877

 
22,209

 

 
(43,086
)
 
 
$
136,594


Consolidating statement of income
Year ended December 31, 2014
(in thousands)
Hawaiian Electric
 
Hawaii Electric Light
 
Maui Electric
 
Other subsidiaries
 
Consolidating adjustments
 
 
Hawaiian Electric
Consolidated
Revenues
$
2,142,245

 
422,200

 
422,965

 

 
(87
)
[1]
 
$
2,987,323

Expenses
 
 
 
 
 
 
 
 
 
 
 
 
Fuel oil
821,246

 
117,215

 
193,224

 

 

 
 
1,131,685

Purchased power
537,821

 
123,226

 
60,961

 

 

 
 
722,008

Other operation and maintenance
283,532

 
65,471

 
61,609

 

 

 
 
410,612

Depreciation
109,204

 
35,904

 
21,279

 

 

 
 
166,387

Taxes, other than income taxes
201,426

 
39,521

 
39,916

 

 

 
 
280,863

Impairment of utility assets

 

 

 

 

 
 

   Total expenses
1,953,229

 
381,337

 
376,989

 

 

 
 
2,711,555

Operating income
189,016

 
40,863

 
45,976

 

 
(87
)
 
 
275,768

Allowance for equity funds used
   during construction
6,085

 
472

 
214

 

 

 
 
6,771

Equity in earnings of subsidiaries
40,964

 

 

 

 
(40,964
)
[2]
 

Interest expense and other charges, net
(44,041
)
 
(11,030
)
 
(9,773
)
 
 
 
87

[1]
 
(64,757
)
Allowance for borrowed funds used during construction
2,306

 
182

 
91

 

 

 
 
2,579

Income before income taxes
194,330

 
30,487

 
36,508

 

 
(40,964
)
 
 
220,361

Income taxes
55,609

 
11,264

 
13,852

 

 

 
 
80,725

Net income
138,721

 
19,223

 
22,656

 

 
(40,964
)
 
 
139,636

Preferred stock dividends of subsidiaries

 
534

 
381

 

 

 
 
915

Net income attributable to Hawaiian Electric
138,721

 
18,689

 
22,275

 

 
(40,964
)
 
 
138,721

Preferred stock dividends of Hawaiian Electric
1,080

 

 

 

 

 
 
1,080

Net income for common stock
$
137,641

 
18,689

 
22,275

 

 
(40,964
)
 
 
$
137,641


Consolidating statement of comprehensive income (loss)
Year ended December 31, 2014
(in thousands)
Hawaiian Electric
 
Hawaii Electric Light
 
Maui Electric
 
Other subsidiaries
 
Consolidating adjustments
 
 
Hawaiian Electric
Consolidated
Net income for common stock
$
137,641

 
18,689

 
22,275

 

 
(40,964
)
 
 
$
137,641

Other comprehensive income (loss), net of taxes:
 
 
 
 
 
 
 
 
 
 
 
 
Retirement benefit plans:
 

 
 

 
 

 
 

 
 

 
 
 

Net gains arising during the period, net of taxes
(218,608
)
 
(28,725
)
 
(29,352
)
 

 
58,077

[1]
 
(218,608
)
Less: amortization of transition obligation, prior service credit and net losses recognized during the period in net periodic benefit cost, net of tax benefits
10,212

 
1,270

 
1,090

 

 
(2,360
)
[1]
 
10,212

Less: reclassification adjustment for impact of D&Os of the PUC included in regulatory assets, net of tax benefits
207,833

 
27,437

 
28,257

 

 
(55,694
)
[1]
 
207,833

Other comprehensive loss, net of tax benefits
(563
)
 
(18
)
 
(5
)
 

 
23

 
 
(563
)
Comprehensive income attributable to common shareholder
$
137,078

 
18,671

 
22,270

 

 
(40,941
)
 
 
$
137,078


Consolidating statement of income
Year ended December 31, 2013
(in thousands)
Hawaiian Electric
 
Hawaii Electric Light
 
Maui Electric
 
Other subsidiaries
 
Consolidating adjustments
 
 
Hawaiian Electric
Consolidated
Revenues
$
2,124,174

 
431,517

 
424,603

 

 
(122
)
[1]
 
$
2,980,172

Expenses
 
 
 
 
 
 
 
 
 
 
 
 
Fuel oil
851,365

 
125,516

 
208,671

 

 

 
 
1,185,552

Purchased power
527,839

 
128,368

 
54,474

 

 

 
 
710,681

Other operation and maintenance
283,768

 
61,418

 
58,081

 
3

 

 
 
403,270

Depreciation
99,738

 
34,188

 
20,099

 

 

 
 
154,025

Taxes, other than income taxes
200,962

 
40,092

 
40,077

 

 

 
 
281,131

Impairment of utility assets

 

 

 

 

 
 

   Total expenses
1,963,672

 
389,582

 
381,402

 
3

 

 
 
2,734,659

Operating income (loss)
160,502

 
41,935

 
43,201

 
(3
)
 
(122
)
 
 
245,513

Allowance for equity funds used
   during construction
4,495

 
643

 
423

 

 

 
 
5,561

Equity in earnings of subsidiaries
41,410

 

 

 

 
(41,410
)
[2]
 

Interest expense and other charges, net
(39,107
)
 
(11,341
)
 
(8,953
)
 

 
122

[1]
 
(59,279
)
Allowance for borrowed funds used during construction
1,814

 
263

 
169

 

 

 
 
2,246

Income (loss) before income taxes
169,114

 
31,500

 
34,840

 
(3
)
 
(41,410
)
 
 
194,041

Income taxes
45,105

 
10,830

 
13,182

 

 

 
 
69,117

Net income (loss)
124,009

 
20,670

 
21,658

 
(3
)
 
(41,410
)
 
 
124,924

Preferred stock dividends of subsidiaries

 
534

 
381

 

 

 
 
915

Net income (loss) attributable to Hawaiian Electric
124,009

 
20,136

 
21,277

 
(3
)
 
(41,410
)
 
 
124,009

Preferred stock dividends of Hawaiian Electric
1,080

 

 

 

 

 
 
1,080

Net income (loss) for common stock
$
122,929

 
20,136

 
21,277

 
(3
)
 
(41,410
)
 
 
$
122,929

Consolidating statement of comprehensive income (loss)
Year ended December 31, 2013
(in thousands)
Hawaiian Electric
 
Hawaii Electric Light
 
Maui Electric
 
Other subsidiaries
 
Consolidating adjustments
 
 
Hawaiian Electric
Consolidated
Net income (loss) for common stock
$
122,929

 
20,136

 
21,277

 
(3
)
 
(41,410
)
 
 
$
122,929

Other comprehensive income, net of taxes:
 
 
 
 
 
 
 
 
 
 
 
 
Retirement benefit plans:
 

 
 

 
 

 
 

 
 

 
 
 

Net losses arising during the period, net of tax benefits
203,479

 
30,542

 
27,820

 

 
(58,362
)
[1]
 
203,479

Less: amortization of transition obligation, prior service credit and net losses recognized during the period in net periodic benefit cost, net of tax benefits
20,694

 
2,880

 
2,557

 

 
(5,437
)
[1]
 
20,694

Less: reclassification adjustment for impact of D&Os of the PUC included in regulatory assets, net of tax benefits
(222,595
)
 
(33,277
)
 
(30,254
)
 

 
63,531

[1]
 
(222,595
)
Other comprehensive income, net of taxes
1,578

 
145

 
123

 

 
(268
)
 
 
1,578

Comprehensive income (loss) attributable to common shareholder
$
124,507

 
20,281

 
21,400

 
(3
)
 
(41,678
)
 
 
$
124,507


Consolidating balance sheet
December 31, 2015
(in thousands)
Hawaiian Electric
 
Hawaii Electric Light
 
Maui Electric
 
Other subsidiaries
 
Consolidating
adjustments
 
 
Hawaiian Electric
Consolidated
Assets
 

 
 

 
 

 
 

 
 

 
 
 

Property, plant and equipment
 
 
 
 
 
 
 
 
 
 
 
 
Utility property, plant and equipment
 

 
 

 
 

 
 

 
 

 
 
 

Land
$
43,557

 
6,219

 
3,016

 

 

 
 
$
52,792

Plant and equipment
4,026,079

 
1,212,195

 
1,077,424

 

 

 
 
6,315,698

Less accumulated depreciation
(1,316,467
)
 
(486,028
)
 
(463,509
)
 

 

 
 
(2,266,004
)
Construction in progress
147,979

 
11,455

 
15,875

 

 

 
 
175,309

Utility property, plant and equipment, net
2,901,148

 
743,841

 
632,806

 

 

 
 
4,277,795

Nonutility property, plant and equipment, less accumulated depreciation
5,659

 
82

 
1,531

 

 

 
 
7,272

Total property, plant and equipment, net
2,906,807

 
743,923

 
634,337

 

 

 
 
4,285,067

Investment in wholly-owned subsidiaries, at equity
556,528

 

 

 

 
(556,528
)
[2]
 
0

Current assets
 

 
 

 
 

 
 

 
 

 
 
 

Cash and equivalents
16,281

 
2,682

 
5,385

 
101

 

 
 
24,449

Advances to affiliates

 
15,500

 
7,500

 

 
(23,000
)
[1]
 

Customer accounts receivable, net
93,515

 
20,508

 
18,755

 

 

 
 
132,778

Accrued unbilled revenues, net
60,080

 
12,531

 
11,898

 

 

 
 
84,509

Other accounts receivable, net
16,421

 
1,275

 
1,674

 

 
(8,962
)
[1]
 
10,408

Fuel oil stock, at average cost
49,455

 
8,310

 
13,451

 

 

 
 
71,216

Materials and supplies, at average cost
30,921

 
6,865

 
16,643

 

 

 
 
54,429

Prepayments and other
25,505

 
9,091

 
2,295

 

 
(251
)
[3]
 
36,640

Regulatory assets
63,615

 
4,501

 
4,115

 

 

 
 
72,231

Total current assets
355,793

 
81,263

 
81,716

 
101

 
(32,213
)
 
 
486,660

Other long-term assets
 

 
 

 
 

 
 

 
 

 
 
 

Regulatory assets
608,957

 
114,562

 
100,981

 

 

 
 
824,500

Unamortized debt expense
5,742

 
1,494

 
1,105

 

 

 
 
8,341

Other
47,731

 
14,693

 
13,062

 

 

 
 
75,486

Total other long-term assets
662,430

 
130,749

 
115,148

 

 

 
 
908,327

Total assets
$
4,481,558

 
955,935

 
831,201

 
101

 
(588,741
)
 
 
$
5,680,054

Capitalization and liabilities
 

 
 

 
 

 
 

 
 

 
 
 

Capitalization
 

 
 

 
 

 
 

 
 

 
 
 

Common stock equity
$
1,728,325

 
292,702

 
263,725

 
101

 
(556,528
)
[2]
 
$
1,728,325

Cumulative preferred stock–not subject to mandatory redemption
22,293

 
7,000

 
5,000

 

 

 
 
34,293

Long-term debt, net
880,546

 
215,000

 
191,000

 

 

 
 
1,286,546

Total capitalization
2,631,164

 
514,702

 
459,725

 
101

 
(556,528
)
 
 
3,049,164

Current liabilities
 

 
 

 
 

 
 

 
 

 
 
 

Short-term borrowings-affiliate
23,000

 

 

 

 
(23,000
)
[1]
 

Accounts payable
84,631

 
17,702

 
12,513

 

 

 
 
114,846

Interest and preferred dividends payable
15,747

 
4,255

 
3,113

 

 
(4
)
[1]
 
23,111

Taxes accrued
131,668

 
30,342

 
29,325

 

 
(251
)
[3]
 
191,084

Regulatory liabilities

 
1,030

 
1,174

 

 

 
 
2,204

Other
41,083

 
8,760

 
13,194

 

 
(8,958
)
[1]
 
54,079

Total current liabilities
296,129

 
62,089

 
59,319

 

 
(32,213
)
 
 
385,324

Deferred credits and other liabilities
 

 
 

 
 

 
 

 
 

 
 
 
Deferred income taxes
466,133

 
100,681

 
87,706

 

 
286

[1]
 
654,806

Regulatory liabilities
254,033

 
84,623

 
30,683

 

 

 
 
369,339

Unamortized tax credits
54,078

 
15,406

 
14,730

 

 

 
 
84,214

Defined benefit pension and other postretirement benefit plans liability
409,021

 
69,893

 
74,060

 

 

 
 
552,974

Other
51,273

 
13,243

 
13,916

 

 
(286
)
[1]
 
78,146

Total deferred credits and other liabilities
1,234,538

 
283,846

 
221,095

 

 

 
 
1,739,479

Contributions in aid of construction
319,727

 
95,298

 
91,062

 

 

 
 
506,087

Total capitalization and liabilities
$
4,481,558

 
955,935

 
831,201

 
101

 
(588,741
)
 
 
$
5,680,054

Consolidating balance sheet
December 31, 2014
(in thousands)
Hawaiian Electric
 
Hawaii Electric Light
 
Maui Electric
 
Other subsidiaries
 
Consolidating
adjustments
 
 
Hawaiian Electric
Consolidated
Assets
 

 
 

 
 

 
 

 
 

 
 
 

Property, plant and equipment
 
 
 
 
 
 
 
 
 
 
 
 
Utility property, plant and equipment
 

 
 

 
 

 
 

 
 

 
 
 

Land
$
43,819

 
5,464

 
3,016

 

 

 
 
$
52,299

Plant and equipment
3,782,438

 
1,179,032

 
1,048,012

 

 

 
 
6,009,482

Less accumulated depreciation
(1,253,866
)
 
(473,933
)
 
(447,711
)
 

 

 
 
(2,175,510
)
Construction in progress
134,376

 
12,421

 
11,819

 

 

 
 
158,616

Utility property, plant and equipment, net
2,706,767

 
722,984

 
615,136

 

 

 
 
4,044,887

Nonutility property, plant and equipment, less accumulated depreciation
4,950

 
82

 
1,531

 

 

 
 
6,563

Total property, plant and equipment, net
2,711,717

 
723,066

 
616,667

 

 

 
 
4,051,450

Investment in wholly-owned subsidiaries, at equity
538,639

 

 

 

 
(538,639
)
[2]
 

Current assets
 

 
 

 
 

 
 

 
 

 
 
 

Cash and equivalents
12,416

 
612

 
633

 
101

 

 
 
13,762

Advances to affiliates
16,100

 

 

 

 
(16,100
)
[1]
 

Customer accounts receivable, net
111,462

 
24,222

 
22,800

 

 

 
 
158,484

Accrued unbilled revenues, net
103,072

 
15,926

 
18,376

 

 

 
 
137,374

Other accounts receivable, net
9,980

 
981

 
2,246

 

 
(8,924
)
[1]
 
4,283

Fuel oil stock, at average cost
74,515

 
13,800

 
17,731

 

 

 
 
106,046

Materials and supplies, at average cost
33,154

 
6,664

 
17,432

 

 

 
 
57,250

Prepayments and other
20,231

 
10,137

 
3,575

 

 
(475
)
[1], [3]
 
33,468

Regulatory assets
58,550

 
6,745

 
6,126

 

 

 
 
71,421

Total current assets
439,480

 
79,087

 
88,919

 
101

 
(25,499
)
 
 
582,088

Other long-term assets
 

 
 

 
 

 
 

 
 

 
 
 

Regulatory assets
623,784

 
107,454

 
102,788

 

 
(183
)
[1]
 
833,843

Unamortized debt expense
5,640

 
1,438

 
1,245

 

 

 
 
8,323

Other
53,106

 
15,366

 
13,366

 

 

 
 
81,838

Total other long-term assets
682,530

 
124,258

 
117,399

 

 
(183
)
 
 
924,004

Total assets
$
4,372,366

 
926,411

 
822,985

 
101

 
(564,321
)
 
 
$
5,557,542

Capitalization and liabilities
 

 
 

 
 

 
 

 
 

 
 
 

Capitalization
 

 
 

 
 

 
 

 
 

 
 
 

Common stock equity
$
1,682,144

 
281,846

 
256,692

 
101

 
(538,639
)
[2]
 
$
1,682,144

Cumulative preferred stock–not subject to mandatory redemption
22,293

 
7,000

 
5,000

 

 

 
 
34,293

Long-term debt, net
830,546

 
190,000

 
186,000

 

 

 
 
1,206,546

Total capitalization
2,534,983

 
478,846

 
447,692

 
101

 
(538,639
)
 
 
2,922,983

Current liabilities
 

 
 

 
 

 
 

 
 

 
 
 

Short-term borrowings-affiliate

 
10,500

 
5,600

 

 
(16,100
)
[1]
 

Accounts payable
122,433

 
23,728

 
17,773

 

 

 
 
163,934

Interest and preferred dividends payable
15,407

 
3,989

 
2,931

 

 
(11
)
[1]
 
22,316

Taxes accrued
176,339

 
37,548

 
36,807

 

 
(292
)
[3]
 
250,402

Regulatory liabilities
191

 

 
441

 

 

 
 
632

Other
45,369

 
9,587

 
15,804

 

 
(9,096
)
[1]
 
61,664

Total current liabilities
359,739

 
85,352

 
79,356

 

 
(25,499
)
 
 
498,948

Deferred credits and other liabilities
 

 
 

 
 

 
 

 
 

 
 
 

Deferred income taxes
407,979

 
91,924

 
73,536

 

 

 
 
573,439

Regulatory liabilities
236,727

 
77,707

 
29,966

 

 
(183
)
[1]
 
344,217

Unamortized tax credits
49,865

 
14,902

 
14,725

 

 

 
 
79,492

Defined benefit pension and other postretirement benefit plans liability
446,888

 
72,547

 
75,960

 

 

 
 
595,395

Other
52,446

 
10,658

 
13,532

 

 

 
 
76,636

Total deferred credits and other liabilities
1,193,905

 
267,738

 
207,719

 

 
(183
)
 
 
1,669,179

Contributions in aid of construction
283,739

 
94,475

 
88,218

 

 

 
 
466,432

Total capitalization and liabilities
$
4,372,366

 
926,411

 
822,985

 
101

 
(564,321
)
 
 
$
5,557,542


Consolidating statements of changes in common stock equity
(in thousands)
Hawaiian Electric
 
Hawaii Electric Light
 
Maui Electric
 
Other subsidiaries
 
Consolidating
adjustments
 
Hawaiian Electric
Consolidated
Balance, December 31, 2012
$
1,472,136

 
268,908

 
228,927

 
104

 
(497,939
)
 
$
1,472,136

Net income (loss) for common stock
122,929

 
20,136

 
21,277

 
(3
)
 
(41,410
)
 
122,929

Other comprehensive income, net of tax benefits
1,578

 
145

 
123

 

 
(268
)
 
1,578

Issuance of common stock, net of expenses
78,499

 

 
12,461

 

 
(12,461
)
 
78,499

Common stock dividends
(81,578
)
 
(14,387
)
 
(14,017
)
 

 
28,404

 
(81,578
)
Balance, December 31, 2013
$
1,593,564

 
274,802

 
248,771

 
101

 
(523,674
)
 
$
1,593,564

Net income for common stock
137,641

 
18,689

 
22,275

 

 
(40,964
)
 
137,641

Other comprehensive loss, net of taxes
(563
)
 
(18
)
 
(5
)
 

 
23

 
(563
)
Issuance of common stock, net of expenses
39,994

 

 

 

 

 
39,994

Common stock dividends
(88,492
)
 
(11,627
)
 
(14,349
)
 

 
25,976

 
(88,492
)
Balance, December 31, 2014
$
1,682,144

 
281,846

 
256,692

 
101

 
(538,639
)
 
$
1,682,144

Net income for common stock
135,714

 
20,755

 
22,165

 

 
(42,920
)
 
135,714

Other comprehensive income, net of tax benefits
880

 
122

 
44

 

 
(166
)
 
880

Common stock issuance expenses
(8
)
 

 
(1
)
 

 
1

 
(8
)
Common stock dividends
(90,405
)
 
(10,021
)
 
(15,175
)
 

 
25,196

 
(90,405
)
Balance, December 31, 2015
$
1,728,325

 
292,702

 
263,725

 
101

 
(556,528
)
 
$
1,728,325


Consolidating statement of cash flows
Year ended December 31, 2015
(in thousands)
Hawaiian Electric
 
Hawaii Electric Light
 
Maui Electric
 
Other subsidiaries
 
Consolidating
adjustments
 
 
Hawaiian Electric
Consolidated
Cash flows from operating activities
 

 
 

 
 

 
 

 
 

 
 
 

Net income
$
136,794

 
21,289

 
22,546

 

 
(42,920
)
[2]
 
$
137,709

Adjustments to reconcile net income to net cash provided by operating activities
 

 
 

 
 

 
 

 
 

 
 
 

Equity in earnings
(43,020
)
 

 

 

 
42,920

[2]
 
(100
)
Common stock dividends received from subsidiaries
25,296

 

 

 

 
(25,196
)
[2]
 
100

Depreciation of property, plant and equipment
117,682

 
37,250

 
22,448

 

 

 
 
177,380

Other amortization
4,678

 
2,124

 
2,137

 

 

 
 
8,939

Impairment of utility assets
4,573

 
724

 
724

 

 

 
 
6,021

Other
4,403

 
(2,476
)
 
(255
)
 

 

 
 
1,672

Increase in deferred income taxes
53,338

 
8,295

 
13,707

 

 
286

[1]
 
75,626

Change in tax credits, net
4,284

 
527

 
33

 

 

 
 
4,844

Allowance for equity funds used during construction
(5,641
)
 
(604
)
 
(683
)
 

 

 
 
(6,928
)
Changes in assets and liabilities:
 
 
 

 
 
 
 
 
 

 
 
 
Decrease in accounts receivable
15,652

 
3,420

 
4,617

 

 
38

[1]
 
23,727

Decrease in accrued unbilled revenues
29,733

 
4,593

 
5,767

 

 

 
 
40,093

Decrease in fuel oil stock
25,060

 
5,490

 
4,280

 

 

 
 
34,830

Decrease (increase) in materials and supplies
2,233

 
(201
)
 
789

 

 

 
 
2,821

Decrease (increase) in regulatory assets
(20,356
)
 
(3,930
)
 
104

 

 

 
 
(24,182
)
Decrease in accounts payable
(42,751
)
 
(6,425
)
 
(5,379
)
 

 

 
 
(54,555
)
Change in prepaid and accrued income taxes and revenue taxes
(50,382
)
 
(6,166
)
 
(6,548
)
 

 

 
 
(63,096
)
Increase (decrease) in defined benefit pension and other postretirement benefit plans liability
870

 
(161
)
 
416

 

 

 
 
1,125

Change in other assets and liabilities
(24,197
)
 
(3,545
)
 
(4,554
)
 

 
(324
)
[1]
 
(32,620
)
Net cash provided by operating activities
238,249

 
60,204

 
60,149

 

 
(25,196
)
 
 
333,406

Cash flows from investing activities
 

 
 

 
 

 
 

 
 

 
 
 

Capital expenditures
(267,621
)
 
(48,645
)
 
(33,895
)
 

 

 
 
(350,161
)
Contributions in aid of construction
35,955

 
2,160

 
2,124

 

 

 
 
40,239

Advances from affiliates
16,100

 
(15,500
)
 
(7,500
)
 

 
6,900

[1]
 

Other
924

 
132

 
84

 

 

 
 
1,140

Net cash used in investing activities
(214,642
)
 
(61,853
)
 
(39,187
)
 

 
6,900

 
 
(308,782
)
Cash flows from financing activities
 

 
 

 
 

 
 

 
 

 
 
 

Common stock dividends
(90,405
)
 
(10,021
)
 
(15,175
)
 

 
25,196

[2]
 
(90,405
)
Preferred stock dividends of Hawaiian Electric and subsidiaries
(1,080
)
 
(534
)
 
(381
)
 

 

 
 
(1,995
)
Proceeds from issuance of long-term debt
50,000

 
25,000

 
5,000

 

 

 
 
80,000

Net increase (decrease) in short-term borrowings from non-affiliates and affiliate with original maturities of three months or less
23,000

 
(10,500
)
 
(5,600
)
 

 
(6,900
)
[2]
 

Other
(1,257
)
 
(226
)
 
(54
)
 

 

 
 
(1,537
)
Net cash (used in) provided by financing activities
(19,742
)
 
3,719

 
(16,210
)
 

 
18,296

 
 
(13,937
)
Net increase in cash and cash equivalents
3,865

 
2,070

 
4,752

 

 

 
 
10,687

Cash and cash equivalents, January 1
12,416

 
612

 
633

 
101

 

 
 
13,762

Cash and cash equivalents, December 31
$
16,281

 
2,682

 
5,385

 
101

 

 
 
$
24,449


Consolidating statement of cash flows
Year ended December 31, 2014
(in thousands)
Hawaiian Electric
 
Hawaii Electric Light
 
Maui Electric
 
Other subsidiaries
 
Consolidating
adjustments
 
 
Hawaiian Electric
Consolidated
Cash flows from operating activities
 

 
 

 
 

 
 

 
 

 
 
 

Net income
$
138,721

 
19,223

 
22,656

 

 
(40,964
)
[2]
 
$
139,636

Adjustments to reconcile net income to net cash provided by operating activities
 

 
 

 
 

 
 

 
 

 
 
 

    Equity in earnings
(41,064
)
 

 

 

 
40,964

[2]
 
(100
)
Common stock dividends received from subsidiaries
26,076

 

 

 

 
(25,976
)
[2]
 
100

Depreciation of property, plant and equipment
109,204

 
35,904

 
21,279

 

 

 
 
166,387

Other amortization
4,535

 
2,926

 
2,436

 

 

 
 
9,897

Impairment of utility assets
1,866

 

 

 

 

 
 
1,866

Other
758

 

 

 

 

 
 
758

Increase in deferred income taxes
56,901

 
12,083

 
13,963

 

 

 
 
82,947

Change in tax credits, net
4,998

 
680

 
384

 

 

 
 
6,062

Allowance for equity funds used during construction
(6,085
)
 
(472
)
 
(214
)
 

 

 
 
(6,771
)
Change in cash overdraft

 

 
(1,038
)
 

 

 
 
(1,038
)
Changes in assets and liabilities:
 
 
 

 
 
 
 
 
 

 
 
 
Decrease in accounts receivable
16,213

 
7,150

 
3,483

 

 
(103
)
[1]
 
26,743

Decrease in accrued unbilled revenues
4,680

 
1,174

 
896

 

 

 
 
6,750

Decrease in fuel oil stock
25,098

 
378

 
2,565

 

 

 
 
28,041

Decrease (increase) in materials and supplies
2,357

 
219

 
(2,648
)
 

 

 
 
(72
)
Decrease (increase) in regulatory assets
(14,620
)
 
(3,357
)
 
977

 

 

 
 
(17,000
)
Decrease in accounts payable
(56,044
)
 
(6,645
)
 
(2,838
)
 

 

 
 
(65,527
)
Change in prepaid and accrued income taxes and revenue taxes
(4,166
)
 
(3,251
)
 
3,381

 

 

 
 
(4,036
)
Decrease in defined benefit pension and other postretirement benefit plans liability
(562
)
 

 
(399
)
 

 

 
 
(961
)
Change in other assets and liabilities
(50,180
)
 
(12,907
)
 
(3,703
)
 

 
103

[1]
 
(66,687
)
Net cash provided by operating activities
218,686

 
53,105

 
61,180

 

 
(25,976
)
 
 
306,995

Cash flows from investing activities
 

 
 

 
 

 
 

 
 

 
 
 

Capital expenditures
(237,970
)
 
(49,895
)
 
(48,814
)
 

 

 
 
(336,679
)
Contributions in aid of construction
30,021

 
7,695

 
4,090

 

 

 
 
41,806

Advances from affiliates
(9,261
)
 
1,000

 

 

 
8,261

[1]
 

Other
604

 
492

 
68

 

 

 
 
1,164

Investment in consolidated subsidiary

 

 

 

 

 
 

Net cash used in investing activities
(216,606
)
 
(40,708
)
 
(44,656
)
 

 
8,261

 
 
(293,709
)
Cash flows from financing activities
 

 
 

 
 

 
 

 
 

 
 
 

Common stock dividends
(88,492
)
 
(11,627
)
 
(14,349
)
 

 
25,976

[2]
 
(88,492
)
Preferred stock dividends of Hawaiian Electric and subsidiaries
(1,080
)
 
(534
)
 
(381
)
 

 

 
 
(1,995
)
Proceeds from the issuance of common stock
40,000

 

 

 

 

 
 
40,000

Repayment of long-term debt

 
(11,400
)
 

 

 

 
 
(11,400
)
Net increase (decrease) in short-term borrowings from non-affiliates and affiliate with original maturities of three months or less
(1,000
)
 
10,500

 
(1,239
)
 

 
(8,261
)
[1]
 

Other
(337
)
 
(50
)
 
(75
)
 

 

 
 
(462
)
Net cash used in financing activities
(50,909
)
 
(13,111
)
 
(16,044
)
 

 
17,715

 
 
(62,349
)
Net increase (decrease) in cash and cash equivalents
(48,829
)
 
(714
)
 
480

 

 

 
 
(49,063
)
Cash and cash equivalents, January 1
61,245

 
1,326

 
153

 
101

 

 
 
62,825

Cash and cash equivalents, December 31
$
12,416

 
612

 
633

 
101

 

 
 
$
13,762


Consolidating statement of cash flows
Year ended December 31, 2013
(in thousands)
Hawaiian Electric
 
Hawaii Electric Light
 
Maui Electric
 
Other subsidiaries
 
Consolidating
adjustments
 
 
Hawaiian Electric
Consolidated
Cash flows from operating activities
 

 
 

 
 

 
 

 
 

 
 
 

Net income (loss)
$
124,009

 
20,670

 
21,658

 
(3
)
 
(41,410
)
[2]
 
$
124,924

Adjustments to reconcile net income (loss) to net cash provided by (used in) operating activities
 

 
 

 
 

 
 

 
 

 
 
 

    Equity in earnings
(41,510
)
 

 

 

 
41,410

[2]
 
(100
)
Common stock dividends received from subsidiaries
28,505

 

 

 

 
(28,405
)
[2]
 
100

Depreciation of property, plant and equipment
99,738

 
34,188

 
20,099

 

 

 
 
154,025

Other amortization
2,549

 
2,360

 
2,825

 

 

 
 
7,734

Increase in deferred income taxes
41,409

 
10,569

 
12,529

 

 

 
 
64,507

Change in tax credits, net
5,152

 
818

 
1,047

 

 

 
 
7,017

Allowance for equity funds used during construction
(4,495
)
 
(643
)
 
(423
)
 

 

 
 
(5,561
)
Change in cash overdraft

 

 
1,038

 

 

 
 
1,038

Changes in assets and liabilities:
 

 
 

 
 
 
 
 
 

 
 
 
Decrease (increase) in accounts receivable
49,974

 
(1,459
)
 
1,178

 

 
(248
)
[1]
 
49,445

Decrease (increase) in accrued unbilled revenues
(7,152
)
 
(2,707
)
 
33

 

 

 
 
(9,826
)
Decrease in fuel oil stock
23,563

 
1,307

 
2,462

 

 

 
 
27,332

Increase in materials and supplies
(5,598
)
 
(1,547
)
 
(814
)
 

 

 
 
(7,959
)
Increase in regulatory assets
(46,047
)
 
(9,237
)
 
(10,177
)
 

 

 
 
(65,461
)
Increase (decrease) in accounts payable
18,527

 
1,525

 
(5,321
)
 

 

 
 
14,731

Change in prepaid and accrued income taxes and revenue taxes
4,632

 
(4,114
)
 
(2,546
)
 

 

 
 
(2,028
)
Increase (decrease) in defined benefit pension and other postretirement benefit plans liability
2,325

 
(1
)
 
(84
)
 

 

 
 
2,240

Change in other assets and liabilities
(20,613
)
 
(6,894
)
 
(8,034
)
 

 
248

[1]
 
(35,293
)
Net cash provided by (used in) operating activities
274,968

 
44,835

 
35,470

 
(3
)
 
(28,405
)
 
 
326,865

Cash flows from investing activities
 

 
 

 
 

 
 

 
 

 
 
 

Capital expenditures
(262,562
)
 
(58,416
)
 
(57,066
)
 

 

 
 
(378,044
)
Contributions in aid of construction
21,686

 
7,590

 
2,884

 

 

 
 
32,160

Advances from affiliates
2,561

 
17,050

 

 

 
(19,611
)
[1]
 

Other
677

 
21

 
209

 

 

 
 
907

Investment in consolidated subsidiary
(12,461
)
 

 

 

 
12,461

[2]
 

Net cash used in investing activities
(250,099
)
 
(33,755
)
 
(53,973
)
 

 
(7,150
)
 
 
(344,977
)
Cash flows from financing activities
 

 
 

 
 

 
 

 
 

 
 
 

Common stock dividends
(81,578
)
 
(14,388
)
 
(14,017
)
 

 
28,405

[2]
 
(81,578
)
Preferred stock dividends of Hawaiian Electric and subsidiaries
(1,080
)
 
(534
)
 
(381
)
 

 

 
 
(1,995
)
Proceeds from the issuance of common stock
78,500

 

 
12,461

 

 
(12,461
)
[2]
 
78,500

Proceeds from the issuance of long-term debt
140,000

 
56,000

 
40,000

 

 

 
 
236,000

Repayment of long-term debt
(90,000
)
 
(56,000
)
 
(20,000
)
 

 

 
 
(166,000
)
Net decrease in short-term borrowings from non-affiliates and affiliate with original maturities of three months or less
(17,050
)
 

 
(2,561
)
 

 
19,611

[1]
 

Other
(681
)
 
(273
)
 
(195
)
 

 

 
 
(1,149
)
Net cash provided by (used in) financing activities
28,111

 
(15,195
)
 
15,307

 

 
35,555

 
 
63,778

Net increase (decrease) in cash and cash equivalents
52,980

 
(4,115
)
 
(3,196
)
 
(3
)
 

 
 
45,666

Cash and cash equivalents, January 1
8,265

 
5,441

 
3,349

 
104

 

 
 
17,159

Cash and cash equivalents, December 31
61,245

 
1,326

 
153

 
101

 

 
 
62,825


Explanation of consolidating adjustments on consolidating schedules:
[1]
Eliminations of intercompany receivables and payables and other intercompany transactions.
[2]
Elimination of investment in subsidiaries, carried at equity.
[3]
Reclassification of accrued income taxes for financial statement presentation.