Commitments and Contingencies
6 Months Ended
Jun. 30, 2012
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies
Commitments and Contingencies
Macondo well incident
Overview. The semisubmersible drilling rig, Deepwater Horizon, sank on April 22, 2010 after an explosion and fire onboard the rig that began on April 20, 2010. The Deepwater Horizon was owned by Transocean Ltd. and had been drilling the Macondo exploration well in Mississippi Canyon Block 252 in the Gulf of Mexico for the lease operator, BP Exploration & Production, Inc. (BP Exploration), an indirect wholly owned subsidiary of BP p.l.c. We performed a variety of services for BP Exploration, including cementing, mud logging, directional drilling, measurement-while-drilling, and rig data acquisition services. Crude oil flowing from the well site spread across thousands of square miles of the Gulf of Mexico and reached the United States Gulf Coast. Numerous attempts at estimating the volume of oil spilled have been made by various groups, and on August 2, 2010 the federal government published an estimate that approximately 4.9 million barrels of oil were discharged from the well. Efforts to contain the flow of hydrocarbons from the well were led by the United States government and by BP p.l.c., BP Exploration, and their affiliates (collectively, BP). The flow of hydrocarbons from the well ceased on July 15, 2010, and the well was permanently capped on September 19, 2010. There were eleven fatalities and a number of injuries as a result of the Macondo well incident.
We are currently unable to fully estimate the impact the Macondo well incident will have on us. The beginning of the multi-district litigation (MDL) trial referred to below has been delayed to January 2013 in connection with the pending settlement between BP and the Plaintiffs’ Steering Committee (PSC) in the MDL. In addition, BP has settled litigation with several defendants in the MDL. We cannot predict the outcome of the many lawsuits and investigations relating to the Macondo well incident, including orders and rulings of the court that impact the MDL, whether the MDL will proceed to trial, the results of any such trial, the final settlement arrangement between BP and the PSC, the effect that settlement may have on claims against us, or whether we might settle with one or more of the parties to any lawsuit or investigation. At the request of the court, in late February 2012 we participated in a series of discussions with the Magistrate Judge in the MDL relating to whether the MDL could be settled. Although these discussions did not result in a settlement, we recorded a $300 million liability during the first quarter of 2012 for an estimated loss contingency relating to the MDL. This loss contingency, which is included in “Other liabilities” on the condensed consolidated balance sheet as of June 30, 2012 and in “Cost of services” on the condensed consolidated statement of operations for the six months ended June 30, 2012, represents a loss contingency that is probable and for which a reasonable estimate of a loss or range of loss can be made. Although we continue to believe that we have substantial legal arguments and defenses against any liability and that BP's indemnity obligation protects us, we cannot conclude that a probable loss associated with the MDL is zero. There are additional loss contingencies relating to the Macondo well incident that are reasonably possible but for which we cannot make a reasonable estimate. Given the numerous potential developments relating to the MDL and other lawsuits and investigations, which could occur at any time, we may adjust our estimated loss contingency in the future. Liabilities arising out of the Macondo well incident could have a material adverse effect on our liquidity, consolidated results of operations, and consolidated financial condition.
Investigations and Regulatory Action. The United States Coast Guard, a component of the United States Department of Homeland Security, and the Bureau of Ocean Energy Management, Regulation and Enforcement (BOEMRE) (formerly known as the Minerals Management Service (MMS) and which was replaced effective October 1, 2011 by two new, independent bureaus – the Bureau of Safety and Environmental Enforcement (BSEE) and the Bureau of Ocean Energy Management (BOEM)), a bureau of the United States Department of the Interior, shared jurisdiction over the investigation into the Macondo well incident and formed a joint investigation team that reviewed information and held hearings regarding the incident (Marine Board Investigation). We were named as one of the 16 parties-in-interest in the Marine Board Investigation. The Marine Board Investigation, as well as investigations of the incident that were conducted by The National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling (National Commission) and the National Academy of Sciences, have been completed, and reports issued as a result of those investigations are discussed below. In addition, the Chemical Safety Board is conducting an investigation to examine the root causes of the accidental release of hydrocarbons from the Macondo well, including an examination of key technical factors, the safety cultures involved, and the effectiveness of relevant laws, regulations, and industry standards.
DOJ Investigations and Actions. On June 1, 2010, the United States Attorney General announced that the Department of Justice (DOJ) was launching civil and criminal investigations into the Macondo well incident to closely examine the actions of those involved, and that the DOJ was working with attorneys general of states affected by the Macondo well incident. The DOJ announced that it was reviewing, among other traditional criminal statutes, possible violations of and liabilities under The Clean Water Act (CWA), The Oil Pollution Act of 1990 (OPA), The Migratory Bird Treaty Act of 1918 (MBTA), and the Endangered Species Act of 1973 (ESA). As part of its criminal investigation, the DOJ is examining certain aspects of our conduct after the incident, including with respect to record-keeping, record retention, post-incident testing and modeling, securities filings, and public statements by us or our employees, to evaluate whether there has been any violation of federal law.
The CWA provides authority for civil and criminal penalties for discharges of oil into or upon navigable waters of the United States, adjoining shorelines, or in connection with the Outer Continental Shelf Lands Act (OCSLA) in quantities that are deemed harmful. A single discharge event may result in the assertion of numerous violations under the CWA. Criminal sanctions under the CWA can be assessed for negligent discharges (up to $50,000 per day per violation), for knowing discharges (up to $100,000 per day per violation), and for knowing endangerment (up to $2 million per violation), and federal agencies could be precluded from contracting with a company that is criminally sanctioned under the CWA. Civil proceedings under the CWA can be commenced against an “owner, operator, or person in charge of any vessel, onshore facility, or offshore facility from which oil or a hazardous substance is discharged” in violation of the CWA. The civil penalties that can be imposed against responsible parties range from up to $1,100 per barrel of oil discharged in the case of those found strictly liable to $4,300 per barrel of oil discharged in the case of those found to have been grossly negligent.
The OPA establishes liability for discharges of oil from vessels, onshore facilities, and offshore facilities into or upon the navigable waters of the United States. Under the OPA, the “responsible party” for the discharging vessel or facility is liable for removal and response costs as well as for damages, including recovery costs to contain and remove discharged oil and damages for injury to natural resources and real or personal property, lost revenues, lost profits, and lost earning capacity. The cap on liability under the OPA is the full cost of removal of the discharged oil plus up to $75 million for damages, except that the $75 million cap does not apply in the event the damage was proximately caused by gross negligence or the violation of certain federal safety, construction or operating standards. The OPA defines the set of responsible parties differently depending on whether the source of the discharge is a vessel or an offshore facility. Liability for vessels is imposed on owners and operators; liability for offshore facilities is imposed on the holder of the permit or lessee of the area in which the facility is located.
The MBTA and the ESA provide penalties for injury and death to wildlife and bird species. The MBTA provides that violators are strictly liable and such violations are misdemeanor crimes subject to fines of up to $15,000 per bird killed and imprisonment of up to six months. The ESA provides for civil penalties for knowing violations that can range up to $25,000 per violation and, in the case of criminal penalties, up to $50,000 per violation.
In addition, federal law provides for a variety of fines and penalties, the most significant of which is the Alternative Fines Act. In lieu of the express amount of the criminal fines that may be imposed under some of the statutes described above, the Alternative Fines Act provides for a fine in the amount of twice the gross economic loss suffered by third parties, which amount, although difficult to estimate, is significant.
On December 15, 2010, the DOJ filed a civil action seeking damages and injunctive relief against BP Exploration, Anadarko Petroleum Corporation and Anadarko E&P Company LP (together, Anadarko), which had an approximate 25% interest in the Macondo well, certain subsidiaries of Transocean Ltd., and others for violations of the CWA and the OPA. The DOJ’s complaint seeks an action declaring that the defendants are strictly liable under the CWA as a result of harmful discharges of oil into the Gulf of Mexico and upon United States shorelines as a result of the Macondo well incident. The complaint also seeks an action declaring that the defendants are strictly liable under the OPA for the discharge of oil that has resulted in, among other things, injury to, loss of, loss of use of, or destruction of natural resources and resource services in and around the Gulf of Mexico and the adjoining United States shorelines and resulting in removal costs and damages to the United States far exceeding $75 million. BP Exploration has been designated, and has accepted the designation, as a responsible party for the pollution under the CWA and the OPA. Others have also been named as responsible parties, and all responsible parties may be held jointly and severally liable for any damages under the OPA. A responsible party may make a claim for contribution against any other responsible party or against third parties it alleges contributed to or caused the oil spill. In connection with the proceedings discussed below under “Litigation,” in April 2011 BP Exploration filed a claim against us for contribution with respect to liabilities incurred by BP Exploration under the OPA or another law and requested a judgment that the DOJ assert its claims for OPA financial liability directly against us. We filed a motion to dismiss BP Exploration’s claim, and that motion is pending.
We have not been named as a responsible party under the CWA or the OPA in the DOJ civil action, and we do not believe we are a responsible party under the CWA or the OPA. While we are not included in the DOJ’s civil complaint, there can be no assurance that the DOJ or other federal or state governmental authorities will not bring an action, whether civil or criminal, against us under the CWA, the OPA, and/or other statutes or regulations. In connection with the DOJ’s filing of the civil action, it announced that its criminal and civil investigations are continuing and that it will employ efforts to hold accountable those who are responsible for the incident.
A federal grand jury has been convened in Louisiana to investigate potential criminal conduct in connection with the Macondo well incident. We are cooperating fully with the DOJ’s criminal investigation. As of July 27, 2012, the DOJ has not commenced any criminal proceedings against us. We cannot predict the status or outcome of the DOJ’s criminal investigation or estimate the potential impact the investigation may have on us or our liability assessment, all of which may change as the investigation progresses.We have had and expect to continue to have discussions with the DOJ regarding the Macondo well incident and associated pre-incident and post-incident conduct.
Investigative Reports. On September 8, 2010, an incident investigation team assembled by BP issued the Deepwater Horizon Accident Investigation Report (BP Report). The BP Report outlined eight key findings of BP related to the possible causes of the Macondo well incident, including failures of cement barriers, failures of equipment provided by other service companies and the drilling contractor, and failures of judgment by BP and the drilling contractor. With respect to the BP Report’s assessment that the cement barrier did not prevent hydrocarbons from entering the wellbore after cement placement, the BP Report concluded that, among other things, there were “weaknesses in cement design and testing.” According to the BP Report, the BP incident investigation team did not review its analyses or conclusions with us or any other entity or governmental agency conducting a separate or independent investigation of the incident. In addition, the BP incident investigation team did not conduct any testing using our cementing products.
On June 22, 2011, Transocean released its internal investigation report on the causes of the Macondo well incident. Transocean’s report, among other things, alleges deficiencies with our cementing services on the Deepwater Horizon. Like the BP Report, the Transocean incident investigation team did not review its analyses or conclusions with us and did not conduct any testing using our cementing products.
On January 11, 2011, the National Commission released “Deep Water -- The Gulf Oil Disaster and the Future of Offshore Drilling,” its investigation report (Investigation Report) to the President of the United States regarding, among other things, the National Commission’s conclusions of the causes of the Macondo well incident. According to the Investigation Report, the “immediate causes” of the incident were the result of a series of missteps, oversights, miscommunications and failures to appreciate risk by BP, Transocean, and us, although the National Commission acknowledged that there were still many things it did not know about the incident, such as the role of the blowout preventer. The National Commission also acknowledged that it may never know the extent to which each mistake or oversight caused the Macondo well incident, but concluded that the immediate cause was “a failure to contain hydrocarbon pressures in the well,” and pointed to three things that could have contained those pressures: “the cement at the bottom of the well, the mud in the well and in the riser, and the blowout preventer.” In addition, the Investigation Report stated that “primary cement failure was a direct cause of the blowout” and that cement testing performed by an independent laboratory “strongly suggests” that the foam cement slurry used on the Macondo well was unstable. The Investigation Report, however, acknowledges a fact widely accepted by the industry that cementing wells is a complex endeavor utilizing an inherently uncertain process in which failures are not uncommon and that, as a result, the industry utilizes the negative-pressure test and cement bond log test, among others, to identify cementing failures that require remediation before further work on a well is performed.
The Investigation Report also sets forth the National Commission’s findings on certain missteps, oversights and other factors that may have caused, or contributed to the cause of, the incident, including BP’s decision to use a long string casing instead of a liner casing, BP’s decision to use only six centralizers, BP’s failure to run a cement bond log, BP’s reliance on the primary cement job as a barrier to a possible blowout, BP’s and Transocean’s failure to properly conduct and interpret a negative-pressure test, BP’s temporary abandonment procedures, and the failure of the drilling crew and our surface data logging specialist to recognize that an unplanned influx of oil, gas, or fluid into the well (known as a “kick”) was occurring. With respect to the National Commission’s finding that our surface data logging specialist failed to recognize a kick, the Investigation Report acknowledged that there were simultaneous activities and other monitoring responsibilities that may have prevented the surface data logging specialist from recognizing a kick.
The Investigation Report also identified two general root causes of the Macondo well incident: systemic failures by industry management, which the National Commission labeled “the most significant failure at Macondo,” and failures in governmental and regulatory oversight. The National Commission cited examples of failures by industry management such as BP’s lack of controls to adequately identify or address risks arising from changes to well design and procedures, the failure of BP’s and our processes for cement testing, communication failures among BP, Transocean, and us, including with respect to the difficulty of our cement job, Transocean’s failure to adequately communicate lessons from a recent near-blowout, and the lack of processes to adequately assess the risk of decisions in relation to the time and cost those decisions would save. With respect to failures of governmental and regulatory oversight, the National Commission concluded that applicable drilling regulations were inadequate, in part because of a lack of resources and political support of the MMS, and a lack of expertise and training of MMS personnel to enforce regulations that were in effect.
As a result of the factual and technical complexity of the Macondo well incident, the Chief Counsel of the National Commission issued a separate, more detailed report regarding the technical, managerial, and regulatory causes of the Macondo well incident in February 2011.
In March 2011, a third party retained by the BOEMRE to undertake a forensic examination and evaluation of the blowout preventer stack, its components and associated equipment, released a report detailing its findings. The forensic examination report found, among other things, that the blowout preventer stack failed primarily because the blind sheer rams did not fully close and seal the well due to a portion of drill pipe that had become trapped between the blocks and the pipe being outside the cutting surface of the ram blades. The forensic examination report recommended further examination, investigation, and testing, which found that the redundant operating pods of the blowout preventer may not have timely activated the blind shear rams in the automatic mode function due to a depleted battery in one pod and a miswired solenoid in the other pod. We had no part in manufacturing or servicing the blowout preventer stack.
In September 2011, the BOEMRE released the final report of the Marine Board Investigation regarding the Macondo well incident (BOEMRE Report). A panel of investigators of the BOEMRE identified a number of causes of the Macondo well incident. According to the BOEMRE Report, “a central cause of the blowout was failure of a cement barrier in the production casing string.” The panel was unable to identify the precise reasons for the failure but concluded that it was likely due to: “(1) swapping of cement and drilling mud in the shoe track (the section of casing near the bottom of the well); (2) contamination of the shoe track cement; or (3) pumping the cement past the target location in the well, leaving the shoe track with little or no cement.” Generally, the panel concluded that the Macondo well incident was the result of, among other things, poor risk management, last-minute changes to drilling plans, failure to observe and respond to critical indicators, and inadequate well control response by the companies and individuals involved. In particular, the BOEMRE Report stated that BP made a series of decisions that complicated the cement job and may have contributed to the failure of the cement job, including the use of only one cement barrier, the location of the production casing, and the failure to follow industry-accepted recommendations.
The BOEMRE Report also stated, among other things, that BP failed to properly communicate well design and cementing decisions and risks to Transocean, that BP and Transocean failed to correctly interpret the negative-pressure test, and that we, BP, and Transocean failed to detect the influx of hydrocarbons into the well. According to the BOEMRE Report, the panel found evidence that we, among others, violated federal regulations relating to the failure to take measures to prevent the unauthorized release of hydrocarbons, the failure to take precautions to keep the well under control, and the failure to cement the well in a manner that would, among other things, prevent the release of fluids into the Gulf of Mexico. In October 2011, the BSEE issued a notification of Incidents of Noncompliance (INCs) to us for violating those regulations and a federal regulation relating to the failure to protect health, safety, property, and the environment as a result of a failure to perform operations in a safe and workmanlike manner. According to the BSEE’s notice, we did not ensure an adequate barrier to hydrocarbon flow after cementing the production casing and did not detect the influx of hydrocarbons until they were above the blowout preventer stack. We understand that the regulations in effect at the time of the alleged violations provide for fines of up to $35,000 per day per violation. We have appealed the INCs to the Interior Board of Land Appeals (IBLA). In January 2012, the IBLA, in response to our and the BSEE’s joint request, has suspended the appeal and has ordered us and the BSEE to file notice within 15 days after the conclusion of the MDL and, within 60 days after the MDL court issues a final decision, to file a proposal for further action in the appeal. The BSEE has announced that the INCs will be reviewed for possible imposition of civil penalties once the appeal has ended. The BSEE has stated that this is the first time the Department of the Interior has issued INCs directly to a contractor that was not the well’s operator.
In December 2011, the National Academy of Sciences released a pre-publication copy of its report examining the causes of the Macondo well incident and identifying measures for preventing similar incidents in the future (NAS Report). The NAS Report noted that it does not attempt to assign responsibility to specific individuals or entities or determine the extent that the parties involved complied with applicable regulations.
According to the NAS Report, the flow of hydrocarbons that led to the blowout began when drilling mud was displaced by seawater during the temporary abandonment process, which was commenced by the drilling team despite a failure to demonstrate the integrity of the cement job after multiple negative pressure tests and after incorrectly deciding that a negative pressure test indicated that the cement barriers were effective. In addition, the NAS Report found, among other things, that: the approach chosen for well completion failed to provide adequate safety margins considering the reservoir formation; the loss of well control was not noted until more than 50 minutes after hydrocarbon flow from the formation had started; the blowout preventer was not designed or tested for the dynamic conditions that most likely existed at the time attempts were made to recapture well control; and the entities involved did not provide an effective systems safety approach commensurate with the risks of the Macondo well. According to the NAS Report, a number of key decisions related to the design, construction, and testing of the barriers critical to the temporary abandonment process were flawed.
The NAS Report also found, among other things, that the heavier “tail” cement slurry, intended for placement in the Macondo well shoe track, was “gravitationally unstable” on top of the lighter foam cement slurry and that the heavier tail cement slurry probably fell into or perhaps through the lighter foam cement slurry during pumping into the well, which would have left a tail slurry containing foam cement in the shoe track. The NAS Report also found, among other things, that foam cement that may have been inadvertently left in the shoe track likely would not have had the strength to resist crushing when experiencing the differential pressures exerted on the cement during the negative pressure test. In addition, the NAS Report found, among other things, that evidence available before the blowout indicated that the flapper valves in the float collar probably failed to seal, but the evidence was not acted upon and, due to BP’s choice of a long-string production casing and the lack of minimum circulation of the well prior to the cement job, the possibility of mud-filled channels or poor cement bonding existed.
The NAS Report also set forth the following observations, among others: (1) there were alternative completion techniques and operational processes available that could have safely prepared the well for temporary abandonment; (2) post-incident static tests on a foam cement slurry similar to the slurry pumped into the Macondo well were performed under laboratory conditions and exhibited the settling of cement and nitrogen breakout, although because the tests were not conducted at bottom hole conditions “it is impossible to say whether the foam was stable at the bottom of the well”; (3) the “cap” cement slurry was subject to contamination by the spacer or the drilling mud that was placed ahead of the cap cement slurry and, if the cap cement slurry was heavily contaminated, it would not reach the strength of uncontaminated cement; (4) the numerous companies involved and the division of technical expertise among those companies affected their ability to perform and maintain an integrated assessment of the margins of safety for the Macondo well; (5) the regulatory regime was ineffective in addressing the risks of the Macondo well; and (6) training of key personnel and decision makers in the industry and regulatory agencies has been inadequate relative to the risks and complexities of deepwater drilling.
The NAS Report recommended, among other things: that all primary cemented barriers to flow should be tested to verify quality, quantity, and location of cement; that the integrity of mechanical barriers should be verified by using the best available test procedures; that blowout preventer systems should be redesigned for the drilling environment to which they are being applied; and that operating companies should have ultimate responsibility and accountability for well integrity, well design, well construction, and the suitability of the rig and associated safety equipment.
The Cementing Job and Reaction to Reports. We disagree with the BP Report, the National Commission, Transocean’s report, the BOEMRE Report, and the NAS Report regarding many of their findings and characterizations with respect to the cementing and surface data logging services, as applicable, on the Deepwater Horizon. We have provided information to the National Commission, its staff, and representatives of the joint investigation team for the Marine Board Investigation that we believe has been overlooked or selectively omitted from the Investigation Report and the BOEMRE Report, as applicable. We intend to continue to vigorously defend ourselves in any investigation relating to our involvement with the Macondo well that we believe inaccurately evaluates or depicts our services on the Deepwater Horizon.
The cement slurry on the Deepwater Horizon was designed and prepared pursuant to well condition data provided by BP. Regardless of whether alleged weaknesses in cement design and testing are or are not ultimately established, and regardless of whether the cement slurry was utilized in similar applications or was prepared consistent with industry standards, we believe that had BP and Transocean properly interpreted a negative-pressure test, this test would have revealed any problems with the cement. In addition, had BP designed the Macondo well to allow a full cement bond log test or if BP had conducted even a partial cement bond log test, the test likely would have revealed any problems with the cement. BP, however, elected not to conduct any cement bond log tests, and with Transocean misinterpreted the negative-pressure test, both of which could have resulted in remedial action, if appropriate, with respect to the cementing services.
At this time we cannot predict the impact of the Investigation Report, the BOEMRE Report, the NAS Report, or the conclusions of future reports of the Chemical Safety Board or others. We also cannot predict whether their investigations or any other report or investigation will have an influence on or result in us being named as a party in any action alleging liability or violation of a statute or regulation, whether federal or state and whether criminal or civil.
We intend to continue to cooperate fully with all hearings, investigations, and requests for information relating to the Macondo well incident. We cannot predict the outcome of, or the costs to be incurred in connection with, any of these hearings or investigations, and therefore we cannot predict the potential impact they may have on us.
Litigation. Since April 21, 2010, plaintiffs have been filing lawsuits relating to the Macondo well incident. Generally, those lawsuits allege either (1) damages arising from the oil spill pollution and contamination (e.g., diminution of property value, lost tax revenue, lost business revenue, lost tourist dollars, inability to engage in recreational or commercial activities) or (2) wrongful death or personal injuries. We are named along with other unaffiliated defendants in more than 400 complaints, most of which are alleged class actions, involving pollution damage claims and at least seven personal injury lawsuits involving four decedents and at least 11 allegedly injured persons who were on the drilling rig at the time of the incident. At least six additional lawsuits naming us and others relate to alleged personal injuries sustained by those responding to the explosion and oil spill. Plaintiffs originally filed the lawsuits described above in federal and state courts throughout the United States. Except for certain lawsuits not yet consolidated, the Judicial Panel on Multi-District Litigation ordered all of the lawsuits against us consolidated in the MDL proceeding before Judge Carl Barbier in the United States Eastern District of Louisiana. The pollution complaints generally allege, among other things, negligence and gross negligence, property damages, taking of protected species, and potential economic losses as a result of environmental pollution and generally seek awards of unspecified economic, compensatory, and punitive damages, as well as injunctive relief. Plaintiffs in these pollution cases have brought suit under various legal provisions, including the OPA, the CWA, the MBTA, the ESA, the OCSLA, the Longshoremen and Harbor Workers Compensation Act, general maritime law, state common law, and various state environmental and products liability statutes.
Furthermore, the pollution complaints include suits brought against us by governmental entities, including the State of Alabama, the State of Louisiana, Plaquemines Parish, the City of Greenville, and three Mexican states. Complaints brought against us by at least seven other parishes in Louisiana were dismissed with prejudice, and the dismissal is being appealed by those parishes. The wrongful death and other personal injury complaints generally allege negligence and gross negligence and seek awards of compensatory damages, including unspecified economic damages and punitive damages. We have retained counsel and are investigating and evaluating the claims, the theories of recovery, damages asserted, and our respective defenses to all of these claims.
Judge Barbier is also presiding over a separate proceeding filed by Transocean under the Limitation of Liability Act (Limitation Action). In the Limitation Action, Transocean seeks to limit its liability for claims arising out of the Macondo well incident to the value of the rig and its freight. Although the Limitation Action is not consolidated in the MDL, to this point the judge is effectively treating the two proceedings as associated cases. In February 2011, Transocean tendered us, along with all other defendants, into the Limitation Action. As a result of the tender, we and all other defendants will be treated as direct defendants to the plaintiffs’ claims as if the plaintiffs had sued each of us and the other defendants directly. In the Limitation Action, the judge intends to determine the allocation of liability among all defendants in the hundreds of lawsuits associated with the Macondo well incident, including those in the MDL proceeding that are pending in his court. Specifically, the judge will determine the liability, limitation, exoneration, and fault allocation with regard to all of the defendants in a trial, which is scheduled to occur in at least two phases beginning in January 2013. The initial two phases of this portion of the trial are scheduled to cover issues arising out of the conduct of various parties allegedly relevant to the loss of well control, the ensuing fire and explosion on and sinking of the Deepwater Horizon, the initiation of the release of hydrocarbons from the Macondo well, the actions relating to the attempts to control the flow of hydrocarbons from the well, and the quantification of hydrocarbons discharged from the well. Subsequent proceedings would be held to the extent triable issues remain unsolved by the first two phases of the trial, settlements, motion practice, or stipulation. We do not believe that a single apportionment of liability in the Limitation Action is properly applied, particularly with respect to gross negligence and punitive damages, to the hundreds of lawsuits pending in the MDL proceeding.
Damages for the cases tried in the MDL proceeding, including punitive damages, are expected to be tried following the portion of the trial described above. Under ordinary MDL procedures, such cases would, unless waived by the respective parties, be tried in the courts from which they were transferred into the MDL. It remains unclear, however, what impact the overlay of the Limitation Action will have on where these matters are tried. Document discovery and depositions among the parties to the MDL are ongoing. It is unclear how the judge will address the DOJ’s civil action for alleged violations of the CWA and the OPA.
In April and May 2011, certain defendants in the proceedings described above filed numerous cross claims and third party claims against certain other defendants. BP Exploration and BP America Production Company filed claims against us seeking subrogation and contribution, including with respect to liabilities under the OPA, and direct damages, and alleging negligence, gross negligence, fraudulent conduct, and fraudulent concealment. Transocean filed claims against us seeking indemnification, and subrogation and contribution, including with respect to liabilities under the OPA and for the total loss of the Deepwater Horizon, and alleging comparative fault and breach of warranty of workmanlike performance. Anadarko filed claims against us seeking tort indemnity and contribution, and alleging negligence, gross negligence and willful misconduct, and MOEX Offshore 2007 LLC (MOEX), who has an approximate 10% interest in the Macondo well, filed a claim against us alleging negligence. Cameron International Corporation (Cameron) (the manufacturer and designer of the blowout preventer), M-I Swaco (provider of drilling fluids and services, among other things), Weatherford U.S. L.P. and Weatherford International, Inc. (together, Weatherford) (providers of casing components, including float equipment and centralizers, and services), and Dril-Quip, Inc. (Dril-Quip) (provider of wellhead systems), each filed claims against us seeking indemnification and contribution, including with respect to liabilities under the OPA in the case of Cameron, and alleging negligence. Additional civil lawsuits may be filed against us. In addition to the claims against us, generally the defendants in the proceedings described above filed claims, including for liabilities under the OPA and other claims similar to those described above, against the other defendants described above. BP has since announced that it has settled those claims between it and each of MOEX, Weatherford, Anadarko, and Cameron. We also understand that BP and M-I Swaco have agreed to dismiss all claims between them.
In April 2011, we filed claims against BP Exploration, BP p.l.c. and BP America Production Company (BP Defendants), M-I Swaco, Cameron, Anadarko, MOEX, Weatherford, Dril-Quip, and numerous entities involved in the post-blowout remediation and response efforts, in each case seeking contribution and indemnification and alleging negligence. Our claims also alleged gross negligence and willful misconduct on the part of the BP Defendants, Anadarko, and Weatherford. We also filed claims against M-I Swaco and Weatherford for contractual indemnification, and against Cameron, Weatherford and Dril-Quip for strict products liability, although the court has since issued orders dismissing all claims asserted against Dril-Quip and Weatherford in the MDL and we have dismissed our contractual indemnification claim against M-I Swaco. We filed our answer to Transocean’s Limitation petition denying Transocean’s right to limit its liability, denying all claims and responsibility for the incident, seeking contribution and indemnification, and alleging negligence and gross negligence.
Judge Barbier has issued an order, among others, clarifying certain aspects of law applicable to the lawsuits pending in his court. The court ruled that: (1) general maritime law will apply and therefore dismissed all claims brought under state law causes of action; (2) general maritime law claims may be brought directly against defendants who are non-“responsible parties” under the OPA with the exception of pure economic loss claims by plaintiffs other than commercial fishermen; (3) all claims for damages, including pure economic loss claims, may be brought under the OPA directly against responsible parties; and (4) punitive damage claims can be brought against both responsible and non-responsible parties under general maritime law. As discussed above, with respect to the ruling that claims for damages may be brought under the OPA against responsible parties, we have not been named as a responsible party under the OPA, but BP Exploration has filed a claim against us for contribution with respect to liabilities incurred by BP Exploration under the OPA.
In September 2011, we filed claims in Harris County, Texas against the BP Defendants seeking damages, including lost profits and exemplary damages, and alleging negligence, grossly negligent misrepresentation, defamation, common law libel, slander, and business disparagement. Our claims allege that the BP Defendants knew or should have known about an additional hydrocarbon zone in the well that the BP Defendants failed to disclose to us prior to our designing the cement program for the Macondo well. The location of the hydrocarbon zones is critical information required prior to performing cementing services and is necessary to achieve desired cement placement. We believe that had the BP Defendants disclosed the hydrocarbon zone to us, we would not have proceeded with the cement program unless it was redesigned, which likely would have required a redesign of the production casing. In addition, we believe that the BP Defendants withheld this information from the BP Report and from the various investigations discussed above. In connection with the foregoing, we also moved to amend our claims against the BP Defendants in the MDL proceeding to include fraud. The BP Defendants have denied all of the allegations relating to the additional hydrocarbon zone and filed a motion to prevent us from adding our fraud claim in the MDL. In October 2011, our motion to add the fraud claim against the BP Defendants in the MDL proceeding was denied. The court’s ruling does not, however, prevent us from using the underlying evidence in our pending claims against the BP Defendants.
In December 2011, BP filed a motion for sanctions against us alleging, among other things, that we destroyed evidence relating to post-incident testing of the foam cement slurry on the Deepwater Horizon and requesting adverse findings against us. A magistrate judge in the MDL proceeding denied BP’s motion. BP appealed that ruling, and Judge Barbier affirmed the magistrate judge’s decision.
In April 2012, BP announced that it had reached definitive settlement agreements with the PSC to resolve the substantial majority of eligible private economic loss and medical claims stemming from the Macondo well incident. The PSC acts on behalf of individuals and business plaintiffs in the MDL. BP has estimated that the cost of the pending settlement would be approximately $7.8 billion, including administration costs and plaintiffs’ attorneys’ fees and expenses, and stated that it is possible the actual cost could be higher or lower. According to BP, the proposed settlement does not include claims against BP made by the DOJ or other federal agencies or by states and local governments. In addition, BP has stated that the proposed settlement provides that, to the extent permitted by law, BP will assign to the PSC certain of its claims, rights and recoveries against Transocean and us for damages not recoverable from BP. We do not believe that our contract with BP Exploration permits the assignment of certain claims to the PSC without our consent. In April and May, 2012, BP and the PSC filed two settlement agreements and amendments with the MDL court, one agreement addressing economic claims and one agreement addressing medical claims, as well as numerous supporting documents and motions requesting that the court approve, among other things, the certification of the classes for both settlements and a schedule for holding a fairness hearing and approving the settlements. In May 2012, the MDL court preliminarily and conditionally certified the classes for both settlements and preliminarily approved the proposed settlements. The MDL court has ordered that any objections to the settlements be filed by the end of August 2012, with hearings on the certification of the classes and fairness of the settlements to begin in November 2012 and with the initial phase of the MDL trial to commence in January 2013. We intend to object to the settlement and take other appropriate actions to protect our interests. We are unable to predict at this time the effect that the settlements may have on claims against us.
We intend to vigorously defend any litigation, fines, and/or penalties relating to the Macondo well incident and to vigorously pursue any damages, remedies, or other rights available to us as a result of the Macondo well incident. We have incurred and expect to continue to incur significant legal fees and costs, some of which we expect to be covered by indemnity or insurance, as a result of the numerous investigations and lawsuits relating to the incident.
Macondo derivative case. In February 2011, a shareholder who had previously made a demand on our Board of Directors with respect to another derivative lawsuit filed a shareholder derivative lawsuit relating to the Macondo well incident. See “Shareholder derivative cases” below.
Indemnification and Insurance. Our contract with BP Exploration relating to the Macondo well generally provides for our indemnification by BP Exploration for certain potential claims and expenses relating to the Macondo well incident, including those resulting from pollution or contamination (other than claims by our employees, loss or damage to our property, and any pollution emanating directly from our equipment). Also, under our contract with BP Exploration, we have, among other things, generally agreed to indemnify BP Exploration and other contractors performing work on the well for claims for personal injury of our employees and subcontractors, as well as for damage to our property. In turn, we believe that BP Exploration was obligated to obtain agreement by other contractors performing work on the well to indemnify us for claims for personal injury of their employees or subcontractors, as well as for damages to their property. We have entered into separate indemnity agreements with Transocean and M-I Swaco, under which we have agreed to indemnify those parties for claims for personal injury of our employees and subcontractors and they have agreed to indemnify us for claims for personal injury of their employees and subcontractors.
In April 2011, we filed a lawsuit against BP Exploration in Harris County, Texas to enforce BP Exploration’s contractual indemnity and alleging BP Exploration breached certain terms of the contractual indemnity provision. BP Exploration removed that lawsuit to federal court in the Southern District of Texas, Houston Division. We filed a motion to remand the case to Harris County, Texas, and the lawsuit was transferred to the MDL.
BP Exploration, in connection with filing its claims with respect to the MDL proceeding, asked that court to declare that it is not liable to us in contribution, indemnification, or otherwise with respect to liabilities arising from the Macondo well incident. Other defendants in the litigation discussed above have generally denied any obligation to contribute to any liabilities arising from the Macondo well incident.
In January 2012, the court in the MDL proceeding entered an order in response to our and BP’s motions for summary judgment regarding certain indemnification matters. The court held that BP is required to indemnify us for third-party compensatory claims, or actual damages, that arise from pollution or contamination that did not originate from our property or equipment located above the surface of the land or water, even if we are found to be grossly negligent. The court did not express an opinion as to whether our conduct amounted to gross negligence, but we do not believe the performance of our services on the Deepwater Horizon constituted gross negligence. The court also held, however, that BP does not owe us indemnity for punitive damages or for civil penalties under the CWA, if any, and that fraud could void the indemnity on public policy grounds, although the court stated that it was mindful that mere failure to perform contractual obligations as promised does not constitute fraud. As discussed above, the DOJ is not seeking civil penalties from us under the CWA. The court in the MDL proceeding deferred ruling on whether our indemnification from BP covers penalties or fines under the OCSLA, whether our alleged breach of our contract with BP Exploration would invalidate the indemnity, and whether we committed an act that materially increased the risk to or prejudiced the rights of BP so as to invalidate the indemnity. We do not believe that we breached our contract with BP Exploration or committed an act that would otherwise invalidate the indemnity. The court’s rulings will be subject to appeal at the appropriate time.
In responding to similar motions for summary judgment between Transocean and BP, the court also held that public policy would not bar Transocean’s claim for indemnification of compensatory damages, even if Transocean was found to be grossly negligent. The court also held, among other things, that Transocean’s contractual right to indemnity does not extend to punitive damages or civil penalties under the CWA.
The rulings in the MDL proceeding regarding the indemnities are based on maritime law and may not bind the determination of similar issues in lawsuits not comprising a part of the MDL proceedings. Accordingly it is possible that different conclusions with respect to indemnities will be reached by other courts.
Indemnification for criminal fines or penalties, if any, may not be available if a court were to find such indemnification unenforceable as against public policy. In addition, certain state laws, if deemed to apply, would not allow for enforcement of indemnification for gross negligence, and may not allow for enforcement of indemnification of persons who are found to be negligent with respect to personal injury claims.
BP’s public filings indicate that BP has recognized in excess of $40 billion in pre-tax charges, excluding offsets for settlement payments received from certain defendants in the proceedings described above under “Litigation,” as a result of the Macondo well incident. BP’s public filings also indicate that the amount of, among other things, certain natural resource damages with respect to certain OPA claims, some of which may be included in such charges, cannot be reliably estimated as of the dates of those filings.
In addition to the contractual indemnities discussed above, we have a general liability insurance program of $600 million. Our insurance is designed to cover claims by businesses and individuals made against us in the event of property damage, injury or death and, among other things, claims relating to environmental damage, as well as legal fees incurred in defending against those claims. We have received and expect to continue to receive payments from our insurers with respect to covered legal fees incurred in connection with the Macondo well incident. Through June 2012, we have incurred legal fees and related expenses of approximately $117 million that have been reimbursed under or that are expected to be covered by our insurance program. To the extent we incur any losses beyond those covered by indemnification, there can be no assurance that our insurance policies will cover all potential claims and expenses relating to the Macondo well incident. In addition, we may not be insured with respect to civil or criminal fines or penalties, if any, pursuant to the terms of our insurance policies. Insurance coverage can be the subject of uncertainties and, particularly in the event of large claims, potential disputes with insurance carriers, as well as other potential parties claiming insured status under our insurance policies.
Barracuda-Caratinga arbitration
We provided indemnification in favor of KBR under the master separation agreement for all out-of-pocket cash costs and expenses (except for legal fees and other expenses of the arbitration so long as KBR controls and directs it), or cash settlements or cash arbitration awards, KBR may incur after November 20, 2006 as a result of the replacement of certain subsea flowline bolts installed in connection with the Barracuda-Caratinga project. At Petrobras’ direction, KBR replaced certain bolts located on the subsea flowlines that failed through mid-November 2005, and KBR informed us that additional bolts have failed thereafter, which were replaced by Petrobras. These failed bolts were identified by Petrobras when it conducted inspections of the bolts. In March 2006, Petrobras commenced arbitration against KBR claiming $220 million plus interest for the cost of monitoring and replacing the defective bolts and all related costs and expenses of the arbitration, including the cost of attorneys’ fees. During the third quarter of 2011, the arbitration panel issued an award against KBR in the amount of $201 million, which, along with accrued interest, is reflected as a liability in our condensed consolidated financial statements. Costs related to this matter are reflected as discontinued operations in our condensed consolidated financial statements. KBR filed a motion to vacate the arbitration award with the United States District Court for the Southern District of New York, and that motion is pending. See Note 5 for additional information regarding the KBR indemnification as well as an unrelated dispute with KBR related to the allocation of certain tax liabilities.
Securities and related litigation
In June 2002, a class action lawsuit was filed against us in federal court alleging violations of the federal securities laws after the Securities and Exchange Commission (SEC) initiated an investigation in connection with our change in accounting for revenue on long-term construction projects and related disclosures. In the weeks that followed, approximately twenty similar class actions were filed against us. Several of those lawsuits also named as defendants several of our present or former officers and directors. The class action cases were later consolidated, and the amended consolidated class action complaint, styled Richard Moore, et al. v. Halliburton Company, et al., was filed and served upon us in April 2003. As a result of a substitution of lead plaintiffs, the case was styled Archdiocese of Milwaukee Supporting Fund (AMSF) v. Halliburton Company, et al. AMSF has changed its name to Erica P. John Fund, Inc. (the Fund). We settled with the SEC in the second quarter of 2004.
In June 2003, the lead plaintiffs filed a motion for leave to file a second amended consolidated complaint, which was granted by the court. In addition to restating the original accounting and disclosure claims, the second amended consolidated complaint included claims arising out of our 1998 acquisition of Dresser Industries, Inc., including that we failed to timely disclose the resulting asbestos liability exposure.
In April 2005, the court appointed new co-lead counsel and named the Fund the new lead plaintiff, directing that it file a third consolidated amended complaint and that we file our motion to dismiss. The court held oral arguments on that motion in August 2005. In March 2006, the court entered an order in which it granted the motion to dismiss with respect to claims arising prior to June 1999 and granted the motion with respect to certain other claims while permitting the Fund to re-plead some of those claims to correct deficiencies in its earlier complaint. In April 2006, the Fund filed its fourth amended consolidated complaint. We filed a motion to dismiss those portions of the complaint that had been re-pled. A hearing was held on that motion in July 2006, and in March 2007 the court ordered dismissal of the claims against all individual defendants other than our Chief Executive Officer (CEO). The court ordered that the case proceed against our CEO and us.
In September 2007, the Fund filed a motion for class certification, and our response was filed in November 2007. The district court held a hearing in March 2008, and issued an order November 3, 2008 denying the motion for class certification. The Fund appealed the district court’s order to the Fifth Circuit Court of Appeals. The Fifth Circuit affirmed the district court’s order denying class certification. On May 13, 2010, the Fund filed a writ of certiorari in the United States Supreme Court. In early January 2011, the Supreme Court granted the writ of certiorari and accepted the appeal. The Court heard oral arguments in April 2011 and issued its decision in June 2011, reversing the Fifth Circuit ruling that the Fund needed to prove loss causation in order to obtain class certification. The Court’s ruling was limited to the Fifth Circuit’s loss causation requirement, and the case was returned to the Fifth Circuit for further consideration of our other arguments for denying class certification. The Fifth Circuit returned the case to the district court, and in January 2012 the court issued an order certifying the class. We filed a Petition for Leave to Appeal with the Fifth Circuit, which was granted and the case is stayed at the district court pending this appeal. In spite of its age, the case is at an early stage, and we cannot predict the outcome or consequences thereof. As of June 30, 2012, we had not accrued any amounts related to this matter because we do not believe that a loss is probable. Further, an estimate of possible loss or range of loss related to this matter cannot be made. We intend to vigorously defend this case.
Shareholder derivative cases
In May 2009, two shareholder derivative lawsuits involving us and KBR were filed in Harris County, Texas, naming as defendants various current and retired Halliburton directors and officers and current KBR directors. These cases allege that the individual Halliburton defendants violated their fiduciary duties of good faith and loyalty, to our detriment and the detriment of our shareholders, by failing to properly exercise oversight responsibilities and establish adequate internal controls. The District Court consolidated the two cases, and the plaintiffs filed a consolidated petition against only current and former Halliburton directors and officers containing various allegations of wrongdoing including violations of the United States Foreign Corrupt Practices Act (FCPA), claimed KBR offenses while acting as a government contractor in Iraq, claimed KBR offenses and fraud under United States government contracts, Halliburton activity in Iran, and illegal kickbacks. Subsequently, a shareholder made a demand that the Board take remedial action respecting the FCPA claims in the pending lawsuit. Our Board of Directors designated a special committee of certain independent and disinterested directors to oversee the investigation of the allegations made in the lawsuits and shareholder demand. Upon receipt of the special committee’s findings and recommendations, the independent and disinterested members of the Board determined that the shareholder claims were without merit and not otherwise in our best interest to pursue. The Board directed our counsel to report its determinations to the plaintiffs and demanding shareholder.
We have agreed in principle, subject to approval by the court, to settle the consolidated lawsuit and the process for seeking that approval is now underway. Under the terms of the proposed settlement, we have agreed to implement certain changes to our corporate governance policies and agreed to pay the plaintiffs’ legal fees. As of June 30, 2012, we have accrued for the plaintiffs’ legal fees, which are not material.
In February 2011, the same shareholder who had made the demand on our Board of Directors in connection with one of the derivative lawsuits discussed above filed a shareholder derivative lawsuit in Harris County, Texas naming us as a nominal defendant and certain of our directors and officers as defendants. This case alleges that these defendants, among other things, breached fiduciary duties of good faith and loyalty by failing to properly exercise oversight responsibilities and establish adequate internal controls, including controls and procedures related to cement testing and the communication of test results, as they relate to the Macondo well incident. Our Board of Directors designated a special committee of certain independent and disinterested directors to oversee the investigation of the allegations made in the lawsuit and shareholder demand. Upon receipt of the special committee’s findings and recommendations, the independent and disinterested members of the Board determined that the shareholder claims were without merit and not otherwise in our best interest to pursue. The Board directed our counsel to report its determinations to the plaintiffs and demanding shareholder.
We have agreed in principle, subject to approval by the court, to settle this lawsuit and the process for seeking that approval is now underway. Under the terms of the proposed settlement, we have agreed to implement certain changes to our corporate governance and health, safety, and environmental policies and agreed to pay the plaintiffs’ legal fees. As of June 30, 2012, we have accrued for the plaintiffs’ legal fees, which are not material.
Investigations
We are conducting internal investigations of certain areas of our operations in Angola and Iraq, focusing on compliance with certain company policies, including our Code of Business Conduct (COBC), and the FCPA and other applicable laws.
In December 2010, we received an anonymous e-mail alleging that certain current and former personnel violated our COBC and the FCPA, principally through the use of an Angolan vendor. The e-mail also alleges conflicts of interest, self-dealing, and the failure to act on alleged violations of our COBC and the FCPA. We contacted the DOJ to advise them that we were initiating an internal investigation.
Since the third quarter of 2011, we have been participating in meetings with the DOJ and the SEC to brief them on the status of our investigation and have been producing documents to them both voluntarily and as a result of SEC subpoenas to the company and certain of our current and former officers and employees.
During the second quarter of 2012, in connection with a meeting with the DOJ and the SEC regarding the above investigation, we advised the DOJ and the SEC that we were initiating unrelated, internal investigations into payments made to a third-party agent relating to certain customs matters in Angola and to third-party agents relating to certain customs and visa matters in Iraq.
We expect to continue to have discussions with the DOJ and the SEC regarding the Angola and Iraq matters described above and have indicated that we would further update them as our investigations progress. We have engaged outside counsel and independent forensic accountants to assist us with the investigations. We intend to continue to cooperate with the DOJ's and the SEC's inquiries and requests in these investigations. Because these investigations are ongoing, we cannot predict their outcome or the consequences thereof.
Environmental
We are subject to numerous environmental, legal, and regulatory requirements related to our operations worldwide. In the United States, these laws and regulations include, among others:
 
-
the Comprehensive Environmental Response, Compensation, and Liability Act;
 
-
the Resource Conservation and Recovery Act;
 
-
the Clean Air Act;
 
-
the Federal Water Pollution Control Act;
 
-
the Toxic Substances Control Act; and
 
-
the Oil Pollution Act of 1990.
In addition to the federal laws and regulations, states and other countries where we do business often have numerous environmental, legal, and regulatory requirements by which we must abide. We evaluate and address the environmental impact of our operations by assessing and remediating contaminated properties in order to avoid future liabilities and comply with environmental, legal, and regulatory requirements. Our Health, Safety and Environment group has several programs in place to maintain environmental leadership and to help prevent the occurrence of environmental contamination. On occasion, in addition to the matters relating to the Macondo well incident described above and the Duncan, Oklahoma matter described below, we are involved in other environmental litigation and claims, including the remediation of properties we own or have operated, as well as efforts to meet or correct compliance-related matters. We do not expect costs related to those remediation requirements to have a material adverse effect on our consolidated financial position or our results of operations. Excluding our loss contingency for the Macondo well incident, our accrued liabilities for environmental matters were $75 million as of June 30, 2012 and $81 million as of December 31, 2011. Because our estimated liability is typically within a range and our accrued liability may be the amount on the low end of that range, our actual liability could eventually be well in excess of the amount accrued. Our total liability related to environmental matters covers numerous properties.
Between approximately 1965 and 1991, one or more former Halliburton units performed work (as a contractor or subcontractor) for the U.S. Department of Defense cleaning solid fuel from missile motor casings at a semi-rural facility on the north side of Duncan, Oklahoma. In addition, from approximately November 1983 through December 1985, a discrete portion of the site was used to conduct a recycling project on stainless steel nuclear fuel rod racks from Omaha Public Power District’s Fort Calhoun Station. We closed the site in coordination with the Oklahoma Department of Environmental Quality (DEQ) in the mid-1990s, but continued to monitor the groundwater at the DEQ’s request. A principal component of the missile fuel was ammonium perchlorate, a salt that is highly soluble in water, which has been discovered in the soil and groundwater on our site and in certain residential water wells near our property. In August 2011, we entered into the DEQ’s Voluntary Cleanup Program and executed a voluntary Memorandum of Agreement and Consent Order for Site Characterization and Risk Based Remediation with the DEQ relating to the remediation of this site.
Commencing in October 2011, a number of lawsuits were filed against us, including a putative class action case in federal court in the Western District of Oklahoma and other lawsuits filed in Oklahoma state courts. The lawsuits generally allege, among other things, that operations at our Duncan facility caused releases of pollutants, including ammonium perchlorate and, in the case of the federal lawsuit, nuclear or radioactive waste, into the groundwater, and that we knew about those releases and did not take corrective actions to address them. It is also alleged that the plaintiffs have suffered from certain health conditions, including hypothyroidism, a condition that has been associated with exposure to perchlorate at sufficiently high doses over time. These cases seek, among other things, damages, including punitive damages, and the establishment of a fund for future medical monitoring. The cases allege, among other things, strict liability, trespass, private nuisance, public nuisance, and negligence and, in the case of the federal lawsuit, violations of the U.S. Resource Conservation and Recovery Act (RCRA), resulting in personal injuries, property damage, and diminution of property value.
The lawsuits generally allege that the cleaning of the missile casings at the Duncan facility contaminated the surrounding soils and groundwater, including certain water wells used in a number of residential homes, through the migration of, among other things, ammonium perchlorate. The federal lawsuit also alleges that our processing of radioactive waste from a nuclear power plant over 25 years ago resulted in the release of “nuclear/radioactive” waste into the environment. In April 2012, the judge in the federal lawsuit dismissed the plaintiffs’ RCRA claim. The other claims brought in that lawsuit remain pending.
To date, soil and groundwater sampling relating to the allegations discussed above has confirmed that the alleged nuclear or radioactive material is confined to the soil in a discrete area of the onsite operations and is not presently believed to be in the groundwater onsite or in any areas offsite. The radiological impacts from this discrete area are not believed to present any health risk for offsite exposure. With respect to ammonium perchlorate, we have made arrangements to supply affected residents with bottled drinking water and, if needed, with access to temporary public water supply lines, at no cost to the residents. We have worked with the City of Duncan and the DEQ to expedite expansion of the city water supply to the relevant areas at our expense.
The lawsuits described above are at an early stage, and additional lawsuits and proceedings may be brought against us. We cannot predict their outcome or the consequences thereof. As of June 30, 2012, we had accrued $29 million related to our initial estimate of response efforts, third-party property damage, and remediation related to the Duncan, Oklahoma matter. We intend to vigorously defend the lawsuits and do not believe that these lawsuits will have a material adverse effect on our liquidity, consolidated results of operations, or consolidated financial condition.
Additionally, we have subsidiaries that have been named as potentially responsible parties along with other third parties for 10 federal and state superfund sites for which we have established reserves. As of June 30, 2012, those 10 sites accounted for approximately $6 million of our $75 million total environmental reserve. Despite attempts to resolve these superfund matters, the relevant regulatory agency may at any time bring suit against us for amounts in excess of the amount accrued. With respect to some superfund sites, we have been named a potentially responsible party by a regulatory agency; however, in each of those cases, we do not believe we have any material liability. We also could be subject to third-party claims with respect to environmental matters for which we have been named as a potentially responsible party.
Guarantee arrangements
In the normal course of business, we have agreements with financial institutions under which approximately $1.8 billion of letters of credit, bank guarantees, or surety bonds were outstanding as of June 30, 2012, including $284 million of surety bonds related to Venezuela. Some of the outstanding letters of credit have triggering events that would entitle a bank to require cash collateralization.