Note 7. Commitments and Contingencies
The Gulf of Mexico/Macondo well incident
Overview. The semisubmersible drilling rig, Deepwater Horizon, sank on April 22, 2010 after an explosion and fire onboard the rig that began on April 20, 2010. The Deepwater Horizon was owned by Transocean Ltd. and had been drilling the Macondo exploration well in Mississippi Canyon Block 252 in the Gulf of Mexico for the lease operator, BP Exploration & Production, Inc. (BP Exploration), an indirect wholly owned subsidiary of BP p.l.c. We performed a variety of services for BP Exploration, including cementing, mud logging, directional drilling, measurement-while-drilling, and rig data acquisition services. Crude oil flowing from the well site spread across thousands of square miles of the Gulf of Mexico and reached the United States Gulf Coast. Numerous attempts at estimating the volume of oil spilled have been made by various groups, and on August 2, 2010 the federal government published an estimate that approximately 4.9 million barrels of oil were discharged from the well. Efforts to contain the flow of hydrocarbons from the well were led by the United States government and by BP p.l.c., BP Exploration, and their affiliates (collectively, BP). The flow of hydrocarbons from the well ceased on July 15, 2010, and the well was permanently capped on September 19, 2010. There were eleven fatalities and a number of injuries as a result of the Macondo well incident.
As of June 30, 2011, we had not accrued any amounts related to this matter because we do not believe that a loss is probable. We are currently unable to estimate the full impact the Macondo well incident will have on us. Further, an estimate of a reasonably possible loss or range of loss related to this matter cannot be made. Considering the complexity of the Macondo well, however, and the number of investigations being conducted and lawsuits pending, as discussed below, new information or future developments may require us to adjust our liability assessment, and liabilities arising out of this matter could have a material adverse effect on our liquidity, consolidated results of operations, and consolidated financial condition.
Investigations and Regulatory Action. The United States Coast Guard, a component of the United States Department of Homeland Security, and the Bureau of Ocean Energy Management, Regulation and Enforcement (BOE) (formerly known as the Minerals Management Service), a bureau of the United States Department of the Interior, share jurisdiction over the investigation into the Macondo well incident and have formed a joint investigation team that continues to review information and hold hearings regarding the incident (Marine Board Investigation). We are named as one of the 16 parties-in-interest in the Marine Board Investigation. In addition, other investigations are underway by the Chemical Safety Board and the National Academy of Sciences to, among other things, examine the relevant facts and circumstances concerning the causes of the Macondo well incident and develop options for guarding against future oil spills associated with offshore drilling. We are assisting in efforts to identify the factors that led to the Macondo well incident and have participated and intend to continue participating in various hearings relating to the incident that are held by, among others, certain of the agencies referred to above and various committees and subcommittees of the House of Representatives and the Senate of the United States.
In May 2010, the United States Department of the Interior effectively suspended all offshore deepwater drilling projects in the United States Gulf of Mexico. The suspension was lifted in October 2010. Later, the Department of the Interior issued new guidance for drillers that intend to resume deepwater drilling activity. Despite the fact that the drilling suspension was lifted, the BOE did not issue permits for the resumption of drilling for an extended period of time, and we have experienced a significant reduction in our Gulf of Mexico operations since the Macondo well incident. In the first quarter of 2011, the BOE resumed the issuance of drilling permits, and activity began to slowly recover in the second quarter although there can be no assurance of whether or when operations in the Gulf of Mexico will return to pre-suspension levels. For additional information, see Part II, Item 1(a), "Risk Factors" and "Management's Discussion and Analysis of Financial Condition and Results of Operations - Business Environment and Results of Operations."
DOJ Investigations and Actions. On June 1, 2010, the United States Attorney General announced that the Department of Justice (DOJ) was launching civil and criminal investigations into the Macondo well incident to closely examine the actions of those involved, and that the DOJ was working with attorneys general of states affected by the Macondo well incident. The DOJ announced that it was reviewing, among other traditional criminal statutes, possible violations of and liabilities under The Clean Water Act (CWA), The Oil Pollution Act of 1990 (OPA), The Migratory Bird Treaty Act of 1918 (MBTA), and the Endangered Species Act of 1973 (ESA).
The CWA provides authority for civil and criminal penalties for discharges of oil into or upon navigable waters of the United States, adjoining shorelines, or in connection with the Outer Continental Shelf Lands Act in quantities that are deemed harmful. A single discharge event may result in the assertion of numerous violations under the CWA. Criminal sanctions under the CWA can be assessed for negligent discharges (up to $50,000 per day per violation), for knowing discharges (up to $100,000 per day per violation), and for knowing endangerment (up to $2 million per violation), and federal agencies could be precluded from contracting with a company that is criminally sanctioned under the CWA. Civil proceedings under the CWA can be commenced against an "owner, operator or person in charge of any vessel or offshore facility that discharged oil or a hazardous substance."  The civil penalties that can be imposed against responsible parties range from up to $1,100 per barrel of oil discharged in the case of those found strictly liable to $4,300 per barrel of oil discharged in the case of those found to have been grossly negligent.
The OPA establishes liability for discharges of oil from vessels, onshore facilities, and offshore facilities into or upon the navigable waters of the United States. Under the OPA, the "responsible party" for the discharging vessel or facility is liable for removal and response costs as well as for damages, including recovery costs to contain and remove discharged oil and damages for injury to natural resources, lost revenues, lost profits and lost earning capacity. The cap on liability under the OPA is the full cost of removal of the discharged oil plus up to $75 million for damages, except that the $75 million cap does not apply in the event the damage was proximately caused by gross negligence or the violation of certain federal safety, construction or operating standards. The OPA defines the set of responsible parties differently depending on whether the source of the discharge is a vessel or an offshore facility. Liability for vessels is imposed on owners and operators; liability for offshore facilities is imposed on the holder of the permit or lessee of the area in which the facility is located.
The MBTA and the ESA provide penalties for injury and death to wildlife and bird species. The MBTA provides that violators are strictly liable and provides for fines of up to $15,000 per bird killed and imprisonment of up to six months. The ESA provides for civil penalties for knowing violations that can range up to $25,000 per violation and, in the case of criminal penalties, up to $50,000 per violation.
In addition, the Alternative Fines Act may be applied in lieu of the express amount of the criminal fines that may be imposed under the statutes described above in the amount of twice the gross economic loss suffered by third parties (or twice the gross economic gain realized by the defendant, if greater).
On December 15, 2010, the DOJ filed a civil action seeking damages and injunctive relief against BP Exploration, Anadarko Petroleum Corporation and Anadarko E&P Company LP (together, Anadarko), certain subsidiaries of Transocean Ltd. and others for violations of the CWA and the OPA. The DOJ's complaint seeks an action declaring that the defendants are strictly liable under the CWA as a result of harmful discharges of oil into the Gulf of Mexico and upon U.S. shorelines as a result of the Macondo well incident. The complaint also seeks an action declaring that the defendants are strictly liable under the OPA for the discharge of oil that has resulted in, among other things, injury to, loss of, loss of use of or destruction of natural resources and resource services in and around the Gulf of Mexico and the adjoining U.S. shorelines and resulting in removal costs and damages to the United States far exceeding $75 million. BP has been designated, and has accepted the designation, as a responsible party for the pollution under the CWA and the OPA. Others have also been named as responsible parties, and all responsible parties may be held jointly and severally liable for any damages under the OPA. A responsible party may make a claim for contribution against any other responsible party or against third parties it alleges contributed to or caused the oil spill. In connection with the proceedings discussed below under "Litigation," in April 2011 BP Exploration filed a claim against us for contribution with respect to liabilities incurred by BP Exploration under the OPA and requested a judgment that the DOJ assert its claims for OPA financial liability directly against us.
We were not named as a responsible party under the CWA or the OPA in the DOJ civil action, and we do not believe we are a responsible party under the CWA or the OPA. While we were not included in the DOJ's complaint, there can be no assurance that the DOJ or other federal or state governmental authorities will not bring an action, whether civil or criminal, against us under the CWA, the OPA or other statutes or regulations. In connection with the DOJ's filing of the action, it announced that its criminal and civil investigations are continuing and that it will employ efforts to hold accountable those who are responsible for the incident. The DOJ has convened a grand jury in Louisiana to investigate potential criminal conduct in connection with the Macondo well incident. As of July 21, 2011, the DOJ has not commenced any civil or criminal proceedings against us.
In June 2010, we received a letter from the DOJ requesting thirty days advance notice of any event that may involve substantial transfers of cash or other corporate assets outside of the ordinary course of business. In our reply to the June 2010 DOJ letter, we conveyed our interest in briefing the DOJ on the services we provided on the Deepwater Horizon but indicated that we would not bind ourselves to the DOJ request. Subsequently, we have had and expect to continue to have discussions with the DOJ regarding the Macondo well incident and the request contained in the June 2010 DOJ letter.
Investigative Reports. On September 8, 2010, an incident investigation team assembled by BP issued the Deepwater Horizon Accident Investigation Report (BP Report). The BP Report outlines eight key findings of BP related to the possible causes of the Macondo well incident, including failures of cement barriers, failures of equipment provided by other service companies and the drilling contractor, and failures of judgment by BP and the drilling contractor. With respect to the BP Report's assessment that the cement barrier did not prevent hydrocarbons from entering the wellbore after cement placement, the BP Report concluded that, among other things, there were "weaknesses in cement design and testing."  According to the BP Report, the BP incident investigation team did not review its analyses or conclusions with us or any other entity or governmental agency conducting a separate or independent investigation of the incident. In addition, the BP incident investigation team did not conduct any testing using our cementing products.
On June 22, 2011, Transocean released its internal investigation report on the causes of the Macondo well incident. Transocean's report, among other things, alleges deficiencies with our cementing services on the Deepwater Horizon. Like the BP Report, the Transocean incident investigation team did not review its analyses or conclusions with us and did not conduct any testing using our cementing products.
On January 11, 2011, the National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling (National Commission) released "Deep Water -- The Gulf Oil Disaster and the Future of Offshore Drilling," its investigation report (Investigation Report) to the President of the United States regarding, among other things, the National Commission's conclusions of the causes of the Macondo well incident. According to the Investigation Report, the "immediate causes" of the incident were the result of a series of missteps, oversights, miscommunications and failures to appreciate risk by BP, Transocean, and us, although the National Commission acknowledged that there were still many things it did not know about the incident, such as the role of the blowout preventer. The National Commission also acknowledged that it may never know the extent to which each mistake or oversight caused the Macondo well incident, but concluded that the immediate cause was "a failure to contain hydrocarbon pressures in the well," and pointed to three things that could have contained those pressures: "the cement at the bottom of the well, the mud in the well and in the riser, and the blowout preventer."  In addition, the Investigation Report stated that "primary cement failure was a direct cause of the blowout" and that cement testing performed by an independent laboratory "strongly suggests" that the foam cement slurry used on the Macondo well was unstable. The Investigation Report, however, acknowledges a fact widely accepted by the industry that cementing wells is a complex endeavor utilizing an inherently uncertain process in which failures are not uncommon and that, as a result, the industry utilizes the negative-pressure test and cement bond log test, among others, to identify cementing failures that require remediation before further work on a well is performed.
The Investigation Report also sets forth the National Commission's findings on certain missteps, oversights and other factors that may have caused, or contributed to the cause of, the incident, including BP's decision to use a long string casing instead of a liner casing, BP's decision to use only six centralizers, BP's failure to run a cement bond log, BP's reliance on the primary cement job as a barrier to a possible blowout, BP's and Transocean's failure to properly conduct and interpret a negative-pressure test, BP's temporary abandonment procedures, and the failure of the drilling crew and our surface data logging specialist to recognize that an unplanned influx of oil, gas or fluid into the well (known as a "kick") was occurring. With respect to the National Commission's finding that our surface data logging specialist failed to recognize a kick, the Investigation Report acknowledged that there were simultaneous activities and other monitoring responsibilities that may have prevented the surface data logging specialist from recognizing a kick.
The Investigation Report also identified two general root causes of the Macondo well incident: systemic failures by industry management, which the National Commission labeled "the most significant failure at Macondo," and failures in governmental and regulatory oversight. The National Commission cited examples of failures by industry management such as BP's lack of controls to adequately identify or address risks arising from changes to well design and procedures, the failure of BP's and our processes for cement testing, communication failures among BP, Transocean, and us, including with respect to the difficulty of our cement job, Transocean's failure to adequately communicate lessons from a recent near-blowout, and the lack of processes to adequately assess the risk of decisions in relation to the time and cost those decisions would save. With respect to failures of governmental and regulatory oversight, the National Commission concluded that applicable drilling regulations were inadequate, in part because of a lack of resources and political support of the Minerals Management Service (MMS), and a lack of expertise and training of MMS personnel to enforce regulations that were in effect.
As a result of the factual and technical complexity of the Macondo well incident, the Chief Counsel of the National Commission issued a separate, more detailed report regarding the technical, managerial and regulatory causes of the Macondo well incident in February 2011.
In March 2011, a third party retained by the BOE to undertake a forensic examination and evaluation of the blowout preventer stack, its components and associated equipment, released a report detailing its findings. The forensic examination report found, among other things, that the blowout preventer stack failed primarily because the blind sheer rams did not fully close and seal the well due to a portion of drill pipe that had become trapped between the blocks. The forensic examination report recommended further examination, investigation and testing, which we understand is underway. We had no part in manufacturing or servicing the blowout preventer stack.
The Cementing Job and Reaction to Reports. We disagree with the BP Report, the National Commission, and Transocean's report regarding many of their findings and characterizations with respect to the cementing and surface data logging services on the Deepwater Horizon. We have provided information to the National Commission and its staff that we believe has been overlooked or selectively omitted from the Investigation Report. We intend to continue to vigorously defend ourselves in any investigation relating to our involvement with the Macondo well that we believe inaccurately evaluates or depicts our services on the Deepwater Horizon.
The cement slurry on the Deepwater Horizon was designed and prepared pursuant to well condition data provided by BP. Regardless of whether alleged weaknesses in cement design and testing are or are not ultimately established, and regardless of whether the cement slurry was utilized in similar applications or was prepared consistent with industry standards, we believe that had BP and others properly interpreted a negative-pressure test, this test would have revealed any problems with the cement. In addition, had BP designed the Macondo well to allow a full cement bond log test or if BP had conducted even a partial cement bond log test, the test likely would have revealed any problems with the cement. BP, however, elected not to conduct any cement bond log test, and with others misinterpreted the negative-pressure test, both of which could have resulted in remedial action, if appropriate, with respect to the cementing services.
At this time we cannot predict the impact of the Investigation Report or the conclusions of future reports of the Marine Board Investigation, the Chemical Safety Board, the National Academy of Sciences, Congressional committees, or any other governmental or private entity. We also cannot predict whether their investigations or any other report or investigation will have an influence on or result in our being named as a party in any action alleging violation of a statute or regulation, whether federal or state and whether criminal or civil.
We intend to continue to cooperate fully with all governmental hearings, investigations, and requests for information relating to the Macondo well incident. We cannot predict the outcome of, or the costs to be incurred in connection with, any of these hearings or investigations, and therefore we cannot predict the potential impact they may have on us.
Litigation. Since April 21, 2010, plaintiffs have been filing lawsuits relating to the Macondo well incident. Generally, those lawsuits allege either (1) damages arising from the oil spill pollution and contamination (e.g., diminution of property value, lost tax revenue, lost business revenue, lost tourist dollars, inability to engage in recreational or commercial activities) or (2) wrongful death or personal injuries. To date, we have been named along with other unaffiliated defendants in more than 400 complaints, most of which are alleged class actions, involving pollution damage claims and at least 40 personal injury lawsuits involving seven decedents and at least 59 allegedly injured persons who were on the drilling rig at the time of the incident. Another six lawsuits naming us and others relate to alleged personal injuries sustained by those responding to the explosion and oil spill. Plaintiffs originally filed the lawsuits described above in federal and state courts throughout the United States, including Alabama, Delaware, Florida, Georgia, Kentucky, Louisiana, Mississippi, South Carolina, Tennessee, Texas, and Virginia. Except for certain lawsuits not yet consolidated (including one lawsuit that is proceeding in Louisiana state court, nine lawsuits that are pending in Delaware federal court, two lawsuits that are pending in Texas federal court, and two lawsuits that are proceeding in Texas state court), the Judicial Panel on Multi-District Litigation ordered all of the lawsuits against us consolidated in a multi-district litigation (MDL) proceeding before Judge Carl Barbier in the U.S. Eastern District of Louisiana. The pollution complaints generally allege, among other things, negligence and gross negligence, property damages, taking of protected species, and potential economic losses as a result of environmental pollution and generally seek awards of unspecified economic, compensatory, and punitive damages, as well as injunctive relief. Plaintiffs in these pollution cases have brought suit under various legal provisions, including the OPA, the CWA, the MBTA, the ESA, the Outer Continental Shelf Lands Act, the Longshoremen and Harbor Workers Compensation Act, general maritime law, state common law, and various state environmental and products liability statutes.
Furthermore, the pollution complaints include suits brought against us by governmental entities, including the State of Alabama, the State of Louisiana, Plaquemines Parish, the City of Greenville, and three Mexican states. The wrongful death and other personal injury complaints generally allege negligence and gross negligence and seek awards of compensatory damages, including unspecified economic damages and punitive damages. We have retained counsel and are investigating and evaluating the claims, the theories of recovery, damages asserted, and our respective defenses to all of these claims.
Judge Barbier is also presiding over a separate proceeding filed by Transocean under the Limitation of Liability Act (Limitation Action). In the Limitation Action, Transocean seeks to limit its liability for claims arising out of the Macondo well incident to the value of the rig and its freight. Although the Limitation Action is not consolidated in the MDL, to this point the judge is effectively treating the two proceedings as associated cases. On February 18, 2011, Transocean tendered us, along with all other defendants, into the Limitation Action. As a result of the tender, we and all other defendants will be treated as direct defendants to the plaintiffs' claims as if the plaintiffs had sued each of us and the other defendants directly. In the Limitation Action, the judge intends to determine the allocation of liability among all defendants in the hundreds of lawsuits associated with the Macondo well incident, including those in the MDL proceeding, that are pending in his court. Specifically, the judge will determine the liability, limitation, exoneration and fault allocation with regard to all of the defendants in a trial, which may occur in several phases, that is set to begin in the first quarter 2012. We do not believe, however, that a single apportionment of liability in the Limitation Action is properly applied to the hundreds of lawsuits pending in the MDL proceeding. Damages for the cases tried in the first quarter 2012, including punitive damages, are currently scheduled to be tried in a later phase of the Limitation Action. Under ordinary MDL procedures, such cases would, unless waived by the respective parties, be tried in the courts from which they were transferred into the MDL. It remains unclear, however, what impact the overlay of the Limitation Action will have on where these matters are tried. Document discovery and depositions among the parties to the MDL are underway.
In April and May 2011, certain defendants in the proceedings described above filed numerous cross claims and third party claims against certain other defendants. BP Exploration and BP America Production Company filed claims against us seeking subrogation and contribution, including with respect to liabilities under the OPA, and alleging negligence, gross negligence, fraudulent conduct, and fraudulent concealment. Transocean filed claims against us seeking indemnification, and subrogation and contribution, including with respect to liabilities under the OPA and for the total loss of the Deepwater Horizon, and alleging comparative fault and breach of warranty of workmanlike performance. Anadarko filed claims against us seeking tort indemnity and contribution, and alleging negligence, gross negligence and willful misconduct, and MOEX Offshore 2007 LLC (MOEX), who has an approximate 10% interest in the Macondo well, filed a claim against us alleging negligence. Cameron International Corporation (Cameron) (the manufacturer and designer of the blowout preventer), M-I Swaco (provider of drilling fluids and services, among other things), Weatherford U.S. L.P. and Weatherford International, Inc. (together, Weatherford) (providers of casing components, including float equipment and centralizers, and services), and Dril-Quip, Inc. (Dril-Quip) (provider of wellhead systems), each filed claims against us seeking indemnification and contribution, including with respect to liabilities under the OPA in the case of Cameron, and alleging negligence. Additional civil lawsuits may be filed against us. In addition to the claims against us, generally the defendants in the proceedings described above filed claims, including for liabilities under the OPA and other claims similar to those described above, against the other defendants described above. BP has since announced that it has settled those claims between it and each of Weatherford and MOEX.
In April 2011, we filed claims against BP Exploration, BP p.l.c. and BP America Production Company (BP Defendants), M-I Swaco, Cameron, Anadarko, MOEX, Weatherford, Dril-Quip, and numerous entities involved in the post-blowout remediation and response efforts, in each case seeking contribution and indemnification and alleging negligence. Our claims also alleged gross negligence and willful misconduct on the part of the BP Defendants, Anadarko, and Weatherford. We also filed claims against M-I Swaco and Weatherford for contractual indemnification, and against Cameron, Weatherford and Dril-Quip for strict products liability. We filed our answer to Transocean's Limitation petition denying Transocean's right to limit its liability, denying all claims and responsibility for the incident, seeking contribution and indemnification, and alleging negligence and gross negligence.
We intend to vigorously defend any litigation, fines, and/or penalties relating to the Macondo well incident. We have incurred and expect to continue to incur significant legal fees and costs, some of which we expect to be covered by indemnity or insurance, as a result of the numerous investigations and lawsuits relating to the incident.
Macondo derivative case. In February 2011, a shareholder who had previously made a demand on our board of directors with respect to another derivative lawsuit filed a shareholder derivative lawsuit relating to the Macondo well incident. See "Shareholder derivative cases" below.
Indemnification and Insurance. Our contract with BP Exploration relating to the Macondo well provides for our indemnification by BP Exploration for potential claims and expenses relating to the Macondo well incident, including those resulting from pollution or contamination (other than claims by our employees, loss or damage to our property, and any pollution emanating directly from our equipment). Also, under our contract with BP Exploration, we have, among other things, generally agreed to indemnify BP Exploration and other contractors performing work on the well for claims for personal injury of our employees and subcontractors, as well as for damage to our property. In turn, we believe that BP Exploration was obligated to obtain agreement by other contractors performing work on the well to indemnify us for claims for personal injury of their employees or subcontractors, as well as for damages to their property.
In addition to the contractual indemnity, we have a general liability insurance program of $600 million. Our insurance is designed to cover claims by businesses and individuals made against us in the event of property damage, injury or death and, among other things, claims relating to environmental damage, as well as legal fees incurred in defending against those claims. We have received and expect to continue to receive payments from our insurers with respect to covered legal fees incurred in connection with the Macondo well incident. To the extent we incur any losses beyond those covered by indemnification, there can be no assurance that our insurance policies will cover all potential claims and expenses relating to the Macondo well incident. Insurance coverage can be the subject of uncertainties and, particularly in the event of large claims, potential disputes with insurance carriers, as well as other potential parties claiming insured status under our insurance policies.
In April 2011, we filed a lawsuit against BP Exploration in Harris County, Texas to enforce BP Exploration's contractual indemnity and alleging BP Exploration breached certain terms of the contractual indemnity provision. BP Exploration removed that lawsuit to federal court in the Southern District of Texas, Houston Division, where the judge has issued a stay order pending determination of a conditional order by the MDL panel to transfer the lawsuit to the MDL. We have taken and will continue to take actions to oppose the removal and the transfer to the MDL.
BP Exploration, in connection with filing its claims with respect to the MDL proceeding, asked that court to declare that it is not liable to us in contribution, indemnification or otherwise with respect to liabilities arising from the Macondo well incident. Other defendants in the litigation discussed above have generally denied any obligation to contribute to any liabilities arising from the Macondo well incident.
Indemnification for criminal or civil fines or penalties, if any, may not be available if a court were to find such indemnification unenforceable as against public policy. We do not expect, however, public policy to limit substantially the enforceability of our contractual right to indemnification with respect to liabilities other than criminal fines and penalties, if any. We may not be insured with respect to civil or criminal fines or penalties, if any, pursuant to the terms of our insurance policies.
We believe the law likely to be held applicable to matters relating to the Macondo well incident does not allow for enforcement of indemnification of persons who are found to be grossly negligent, although we do not believe the performance of our services on the Deepwater Horizon constituted gross negligence. In addition, certain state laws, if deemed to apply, may not allow for enforcement of indemnification of persons who are found to be negligent with respect to personal injury claims. Also, financial analysts and the press have speculated about the financial capacity of BP, and whether it might seek to avoid indemnification obligations in bankruptcy proceedings. BP's public filings indicate that BP recognized a $40.9 billion pre-tax charge in 2010 and a $0.4 billion pre-tax charge in the first quarter of 2011 as a result of the Macondo well incident and that the amount of, among other things, any natural resource damages with respect to OPA claims by the United States and by state, tribal and foreign trustees, some of which may be included in such charges, cannot be reliably estimated as of the date of those filings. We consider, however, the likelihood of a BP bankruptcy to be remote.
Barracuda-Caratinga arbitration
We provided indemnification in favor of KBR under the master separation agreement for all out-of-pocket cash costs and expenses (except for legal fees and other expenses of the arbitration so long as KBR controls and directs it), or cash settlements or cash arbitration awards, KBR may incur after November 20, 2006 as a result of the replacement of certain subsea flowline bolts installed in connection with the Barracuda-Caratinga project. Under the master separation agreement, KBR currently controls the defense, counterclaim, and settlement of the subsea flowline bolts matter. As a condition of our indemnity, for any settlement to be binding upon us, KBR must secure our prior written consent to such settlement's terms. We have the right to terminate the indemnity in the event KBR enters into any settlement without our prior written consent.
At Petrobras' direction, KBR replaced certain bolts located on the subsea flowlines that failed through mid-November 2005, and KBR has informed us that additional bolts have failed thereafter, which were replaced by Petrobras. These failed bolts were identified by Petrobras when it conducted inspections of the bolts. We understand KBR believes several possible solutions may exist, including replacement of the bolts. Initial estimates by KBR indicated that costs of these various solutions ranged up to $148 million. In March 2006, Petrobras commenced arbitration against KBR claiming $220 million plus interest for the cost of monitoring and replacing the defective bolts and all related costs and expenses of the arbitration, including the cost of attorneys' fees. The arbitration panel held an evidentiary hearing in March 2008 to determine which party is responsible for the designation of the material used for the bolts. On May 13, 2009, the arbitration panel held that KBR and not Petrobras selected the material to be used for the bolts. Accordingly, the arbitration panel held that there is no implied warranty by Petrobras to KBR as to the suitability of the bolt material and that the parties' rights are to be governed by the express terms of their contract. The parties presented evidence and witnesses to the panel in May 2010, and final arguments were presented in August 2010. We are awaiting a final decision from the arbitration panel. Our estimation of the indemnity obligation regarding the Barracuda-Caratinga arbitration is recorded as a liability in our condensed consolidated financial statements as of June 30, 2011. See Note 6 for additional information regarding the KBR indemnification.
Securities and related litigation
In June 2002, a class action lawsuit was filed against us in federal court alleging violations of the federal securities laws after the SEC initiated an investigation in connection with our change in accounting for revenue on long-term construction projects and related disclosures. In the weeks that followed, approximately twenty similar class actions were filed against us. Several of those lawsuits also named as defendants several of our present or former officers and directors. The class action cases were later consolidated, and the amended consolidated class action complaint, styled Richard Moore, et al. v. Halliburton Company, et al., was filed and served upon us in April 2003. As a result of a substitution of lead plaintiffs, the case is now styled Archdiocese of Milwaukee Supporting Fund (AMSF) v. Halliburton Company, et al. AMSF has changed its name to Erica P. John Fund, Inc. (Erica P. John Fund). We settled with the SEC in the second quarter of 2004.
In June 2003, the lead plaintiffs filed a motion for leave to file a second amended consolidated complaint, which was granted by the court. In addition to restating the original accounting and disclosure claims, the second amended consolidated complaint included claims arising out of the 1998 acquisition of Dresser Industries, Inc. by Halliburton, including that we failed to timely disclose the resulting asbestos liability exposure.
In April 2005, the court appointed new co-lead counsel and named Erica P. John Fund the new lead plaintiff, directing that it file a third consolidated amended complaint and that we file our motion to dismiss. The court held oral arguments on that motion in August 2005, at which time the court took the motion under advisement. In March 2006, the court entered an order in which it granted the motion to dismiss with respect to claims arising prior to June 1999 and granted the motion with respect to certain other claims while permitting Erica P. John Fund to re-plead some of those claims to correct deficiencies in its earlier complaint. In April 2006, Erica P. John Fund filed its fourth amended consolidated complaint. We filed a motion to dismiss those portions of the complaint that had been re-pled. A hearing was held on that motion in July 2006, and in March 2007 the court ordered dismissal of the claims against all individual defendants other than our Chief Executive Officer (CEO). The court ordered that the case proceed against our CEO and Halliburton.
In September 2007, Erica P. John Fund filed a motion for class certification, and our response was filed in November 2007. The court held a hearing in March 2008, and issued an order November 3, 2008 denying Erica P. John Fund's motion for class certification. Erica P. John Fund appealed the district court's order to the Fifth Circuit Court of Appeals. The Fifth Circuit affirmed the district court's order denying class certification. On May 13, 2010, Erica P. John Fund filed a writ of certiorari in the United States Supreme Court. In early January 2011, the Supreme Court granted Erica P. John Fund's writ of certiorari and accepted the appeal. The Court heard oral arguments in April 2011 and issued its decision in June 2011, reversing the Fifth Circuit ruling that Erica P. John Fund needed to prove loss causation in order to obtain class certification. The Court's ruling was limited to the Fifth Circuit's loss causation requirement, and the case was returned to the Fifth Circuit for further consideration of Halliburton's other arguments for denying class certification. As of June 30, 2011, we had not accrued any amounts related to this matter because we do not believe that a loss is probable. Further, an estimate of possible loss or range of loss related to this matter cannot be made.
Shareholder derivative cases
In May 2009, two shareholder derivative lawsuits involving us and KBR were filed in Harris County, Texas, naming as defendants various current and retired Halliburton directors and officers and current KBR directors. These cases allege that the individual Halliburton defendants violated their fiduciary duties of good faith and loyalty, to the detriment of Halliburton and its shareholders, by failing to properly exercise oversight responsibilities and establish adequate internal controls. The District Court consolidated the two cases, and the plaintiffs filed a consolidated petition against only current and former Halliburton directors and officers containing various allegations of wrongdoing including violations of the FCPA, claimed KBR offenses while acting as a government contractor in Iraq, claimed KBR offenses and fraud under United States government contracts, Halliburton activity in Iran, and illegal kickbacks. Subsequently, a shareholder made a demand that the board take remedial action respecting the FCPA claims in the pending lawsuit. Our Board of Directors designated a special committee of independent directors to oversee the investigation of the allegations made in the lawsuits and shareholder demand. Upon receipt of its special committee's findings and recommendations, the Board determined that the shareholder claims were without merit and not otherwise in the best interest of the company to pursue. The Board directed company counsel to report its determinations to the plaintiffs and demanding shareholder. As of June 30, 2011, we had not accrued any amounts related to this matter because we do not believe that a loss is probable. Further, an estimate of possible loss or range of loss related to this matter cannot be made.
In February 2011, the same shareholder who had made the demand on our board of directors in connection with one of the derivative lawsuits discussed above filed a shareholder derivative lawsuit in Harris County, Texas naming us as a nominal defendant and certain of our directors and officers as defendants. This case alleges that these defendants, among other things, breached fiduciary duties of good faith and loyalty by failing to properly exercise oversight responsibilities and establish adequate internal controls, including controls and procedures related to cement testing and the communication of test results, as they relate to the Deepwater Horizon incident. Due to the preliminary status of the lawsuit and uncertainties related to litigation, we are unable to evaluate the likelihood of either a favorable or unfavorable outcome.
Environmental
We are subject to numerous environmental, legal, and regulatory requirements related to our operations worldwide. In the United States, these laws and regulations include, among others:
  
-
the Comprehensive Environmental Response, Compensation, and Liability Act;
  
-
the Resource Conservation and Recovery Act;
  
-
the Clean Air Act;
  
-
the Federal Water Pollution Control Act; and
  
-
the Toxic Substances Control Act.
In addition to the federal laws and regulations, states and other countries where we do business often have numerous environmental, legal, and regulatory requirements by which we must abide. We evaluate and address the environmental impact of our operations by assessing and remediating contaminated properties in order to avoid future liabilities and comply with environmental, legal, and regulatory requirements. Our Health, Safety and Environment group has several programs in place to maintain environmental leadership and to help prevent the occurrence of environmental contamination. On occasion, in addition to the matters relating to the Macondo well incident described above, we are involved in other environmental litigation and claims, including the remediation of properties we own or have operated, as well as efforts to meet or correct compliance-related matters. We do not expect costs related to those remediation requirements to have a material adverse effect on our consolidated financial position or our results of operations. Our accrued liabilities for those environmental matters were $46 million as of June 30, 2011 and $47 million as of December 31, 2010. Our total liability related to environmental matters covers numerous properties.
We have subsidiaries that have been named as potentially responsible parties along with other third parties for 10 federal and state superfund sites for which we have established reserves. As of June 30, 2011, those 10 sites accounted for approximately $7 million of our total $46 million reserve. For any particular federal or state superfund site, since our estimated liability is typically within a range and our accrued liability may be the amount on the low end of that range, our actual liability could eventually be well in excess of the amount accrued. Despite attempts to resolve these superfund matters, the relevant regulatory agency may at any time bring suit against us for amounts in excess of the amount accrued. With respect to some superfund sites, we have been named a potentially responsible party by a regulatory agency; however, in each of those cases, we do not believe we have any material liability. We also could be subject to third-party claims with respect to environmental matters for which we have been named as a potentially responsible party.
Guarantee arrangements
In the normal course of business, we have agreements with financial institutions under which approximately $1.5 billion of letters of credit, bank guarantees, or surety bonds were outstanding as of June 30, 2011, including $240 million of surety bonds related to Venezuela. Some of the outstanding letters of credit have triggering events that would entitle a bank to require cash collateralization.